WorldWideScience

Sample records for student sample schedule

  1. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  2. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  3. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  4. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  5. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  6. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  7. Environmental monitoring master sampling schedule: January--December 1989

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1989-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1989 for the Surface and Ground-Water Environmental Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. This schedule includes routine ground-water sampling performed by PNL for Westinghouse Hanford Company, but does not include samples that may be collected in 1989 to support special studies or special contractor projects, or for quality control. The sampling schedule for Site-wide chemical monitoring is not included here, because it varies each quarter as needed, based on past results and operating needs. This schedule does not include Resource Conservation and Recovery Act ground-water sampling performed by PNL for Hanford Site contractors, nor does it include sampling that may be done by other DOE Hanford contractors

  8. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  9. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  10. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  11. Environmental monitoring master sampling schedule, January--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1990-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1990 for the Environment Surveillance and Ground-Water Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This schedule includes ground-water sampling performed by PNL for environmental surveillance of the Hanford Site.

  12. Hanford site environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1998-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1 open-quotes General Environmental Protection Program,close quotes and DOE Order 5400.5, open-quotes Radiation Protection of the Public and the Environment.close quotes The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 2, U.S. Department of Energy, Richland, Washington. This document contains the 1998 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section of this document describes the planned sampling schedule for a specific media (air, surface water, biota, soil and vegetation, sediment, and external radiation). Each section includes the sample location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be planned for 1998 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing sample locations

  13. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2011-01-21

    This document contains the calendar year 2011 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2011, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2011.

  14. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2007-01-31

    This document contains the calendar year 2007 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2007 in which case the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2007.

  15. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1999-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations

  16. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  17. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2010-01-08

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford Site environs per regulatory requirements. This document contains the calendar year 2010 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2010, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2010.

  18. The impact of exposure to shift-based schedules on medical students

    Directory of Open Access Journals (Sweden)

    David A. Williams

    2015-06-01

    Full Text Available Background: With new resident duty-hour regulations, resident work schedules have progressively transitioned towards shift-based systems, sometimes resulting in increased team fragmentation. We hypothesized that exposure to shift-based schedules and subsequent team fragmentation would negatively affect medical student experiences during their third-year internal medicine clerkship. Design: As part of a larger national study on duty-hour reform, 67 of 150 eligible third-year medical students completed surveys about career choice, teaching and supervision, assessment, patient care, well-being, and attractiveness of a career in internal medicine after completing their internal medicine clerkship. Students who rotated to hospitals with shift-based systems were compared to those who did not. Non-demographic variables used a five-point Likert scale. Chi-squared and Fisher's exact tests were used to assess the relationships between exposure to shift-based schedules and student responses. Questions with univariate p≤0.1 were included in multivariable logistic regression models. Results: Thirty-six students (54% were exposed to shift-based schedules. Students exposed to shift-based schedules were less likely to perceive that their attendings were committed to teaching (odds ratio [OR] 0.35, 95% confidence interval [CI]: 0.13–0.90, p=0.01 or perceive that residents had sufficient exposure to assess their performance (OR 0.29, 95% CI: 0.09–0.91, p=0.03. However, those students were more likely to feel their interns were able to observe them at the bedside (OR 1.89, 95% CI: 1.08–3.13, p=0.02 and had sufficient exposure to assess their performance (OR 3.00, 95% CI: 1.01–8.86, p=0.05. Conclusions: These findings suggest that shift-based schedules designed in response to duty-hour reform may have important broader implications for the teaching environment.

  19. The impact of exposure to shift-based schedules on medical students.

    Science.gov (United States)

    Williams, David A; Kogan, Jennifer R; Hauer, Karen E; Yamashita, Traci; Aagaard, Eva M

    2015-01-01

    With new resident duty-hour regulations, resident work schedules have progressively transitioned towards shift-based systems, sometimes resulting in increased team fragmentation. We hypothesized that exposure to shift-based schedules and subsequent team fragmentation would negatively affect medical student experiences during their third-year internal medicine clerkship. As part of a larger national study on duty-hour reform, 67 of 150 eligible third-year medical students completed surveys about career choice, teaching and supervision, assessment, patient care, well-being, and attractiveness of a career in internal medicine after completing their internal medicine clerkship. Students who rotated to hospitals with shift-based systems were compared to those who did not. Non-demographic variables used a five-point Likert scale. Chi-squared and Fisher's exact tests were used to assess the relationships between exposure to shift-based schedules and student responses. Questions with univariate p ≤ 0.1 were included in multivariable logistic regression models. Thirty-six students (54%) were exposed to shift-based schedules. Students exposed to shift-based schedules were less likely to perceive that their attendings were committed to teaching (odds ratio [OR] 0.35, 95% confidence interval [CI]: 0.13-0.90, p = 0.01) or perceive that residents had sufficient exposure to assess their performance (OR 0.29, 95% CI: 0.09-0.91, p = 0.03). However, those students were more likely to feel their interns were able to observe them at the bedside (OR 1.89, 95% CI: 1.08-3.13, p = 0.02) and had sufficient exposure to assess their performance (OR 3.00, 95% CI: 1.01-8.86, p = 0.05). These findings suggest that shift-based schedules designed in response to duty-hour reform may have important broader implications for the teaching environment.

  20. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2006-01-27

    This document contains the calendar year 2006 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2006 in which case the anticipated year for collection is provided. The project document package (PDP) for Surface Environmental Surveillance contains the milestone control log for the issuing of CY06 Environmental Surveillance Master Sampling Schedule WBS 4.2.3.21.3.03, milestone: RL00430306 (4830106-12).

  1. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2009-01-20

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1 and DOE Order 5400.5. This document contains the calendar year 2009 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2009, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2009.

  2. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2008-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, "Environmental Protection Program," and DOE Order 5400.5, "Radiation Protection of the Public and the Environment." The environmental surveillance sampling design is described in the "Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office." This document contains the calendar year 2008 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2008, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2008.

  3. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  4. Differences in Student Outcomes between Block, Semester, and Trimester Schedules.

    Science.gov (United States)

    McCreary, Jason; Hausman, Charles

    Despite the popularity of schedule modifications as a cost-effective reform to improve student outcomes, little empirical research on the consequences of alternative schedules has been conducted. The literature has been dominated by anecdotal reports. Even when empirical evidence is examined, causal comparisons of school outcomes between schedules…

  5. Successful Implementation of Six Sigma to Schedule Student Staffing for Circulation Service Desks

    Science.gov (United States)

    Jankowski, Janiece

    2013-01-01

    In fall of 2011 the University at Buffalo Libraries circulation department undertook Six Sigma training for the purpose of overhauling its student scheduling process. The department was able to mitigate significant staffing budgetary reductions and resource reallocations and to overcome the unique challenges of scheduling student labor for a…

  6. Master schedule for CY-1984 Hanford environmental surveillance routine sampling program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1983-12-01

    This report provides the current schedule of data collection for the routine Hanford environmental surveillance and ground-water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. The routine sampling schedule provided herein does not include samples that are planned to be collected during FY-1984 in support of special studies, special contractor support programs, or for quality control purposes

  7. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results

  8. The Effects of Work-Reinforcer Schedules on Performance and Preference in Students with Autism

    Science.gov (United States)

    Bukala, Magdalena; Hu, Meng Yao; Lee, Ronald; Ward-Horner, John C.; Fienup, Daniel M.

    2015-01-01

    This study investigated performance under and preference for continuous and discontinuous work-reinforcer schedules in 3 students who had been diagnosed with autism. Under continuous schedules, participants completed all work and consumed all reinforcers in contiguous units. Under discontinuous schedules, work and reinforcer access were broken up…

  9. Effect of sampling schedule on pharmacokinetic parameter estimates of promethazine in astronauts

    Science.gov (United States)

    Boyd, Jason L.; Wang, Zuwei; Putcha, Lakshmi

    2005-08-01

    Six astronauts on the Shuttle Transport System (STS) participated in an investigation on the pharmacokinetics of promethazine (PMZ), a medication used for the treatment of space motion sickness (SMS) during flight. Each crewmember completed the protocol once during flight and repeated thirty days after returned to Earth. Saliva samples were collected at scheduled times for 72 h after PMZ administration; more frequent samples were collected on the ground than during flight owing to schedule constraints in flight. PMZ concentrations in saliva were determined by a liquid chromatographic/mass spectrometric (LC-MS) assay and pharmacokinetic parameters (PKPs) were calculated using actual flight and ground-based data sets and using time-matched sampling schedule on ground to that during flight. Volume of distribution (Vc) and clearance (Cls) decreased during flight compared to that from time-matched ground data set; however, ClS and Vc estimates were higher for all subjects when partial ground data sets were used for analysis. Area under the curve (AUC) normalized with administered dose was similar in flight and partial ground data; however AUC was significantly lower using time-matched sampling compared with the full data set on ground. Half life (t1/2) was longest during flight, shorter with matched-sampling schedule on ground and shortest when complete data set from ground was used. Maximum concentration (Cmax), time for Cmax (tmax), parameters of drug absorption, depicted a similar trend with lowest and longest respectively, during flight, lower with time- matched ground data and highest and shortest with full ground data.

  10. Effectiveness of Time-Based Attention Schedules on Students in Inclusive Classrooms in Turkey

    Science.gov (United States)

    Sazak Pinar, Elif

    2015-01-01

    This study examines the effectiveness of fixed-time (FT) and variable-time (VT) schedules and attention on the problem behaviors and on-task behaviors of students with and without intellectual disabilities in inclusive classrooms in Turkey. Three second-grade students with intellectual disabilities, three students without intellectual…

  11. Congruent Validity of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Harris, Thomas L.; Brown, Nina W.

    1979-01-01

    The validity of the Rathus Assertiveness Schedule (RAS) was investigated by correlating it with the six Class I scales of the California Psychological Inventory on a sample of undergraduate students. Results supported the validity of the RAS. (JKS)

  12. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2005-01-19

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This document contains the calendar year 2005 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project.

  13. The Impact of Single-Gender Scheduling on Students in a Title I School

    Science.gov (United States)

    Moss, Janet L.

    2011-01-01

    This dissertation was designed to examine the impact that single-gender scheduling would have on students who attend a struggling Title I middle school. The importance of the middle level cannot be denied. Strong research points to this time in a student's life as the pivotal crux on which success and failure are balanced. Middle level educators…

  14. Flexible Scheduling May Have a Positive Impact on School Library Circulation. A Review of: Gavigan, K., Pribesh, S., & Dickinson, G. (2010. Fixed or flexible schedule? Schedule impacts and school library circulation. Library and Information Science Research, 32(2, 131-37.

    Directory of Open Access Journals (Sweden)

    Ann Medaille

    2011-03-01

    Full Text Available Objective – To determine whether a significant, positive relationship exists between flexible scheduling in elementary school library media centers and per-pupil circulation statistics.Design – Online survey.Setting – Library media centers in public elementary schools in two states of the United States.Subjects – A total of 88 elementary school library media specialists completed the survey.Methods – A 22-question online survey was created using Inquisite software. A link to the survey was sent via e-mail to a 600-person random sample of public school library media specialists whose names were drawn from the memberships of the North Carolina School Library Media Association and the Virginia Educational Media Association, with combined memberships totalling approximately 2,000. A random sample of 600 was chosen to provide a 95% confidence level with a confidence interval of plus or minus three points. The survey included questions about school schedules (flexible, partially flexible, or fixed, collection size, circulation statistics, total student enrolment, school type (elementary, middle, or high, school location (urban, rural, or suburban, percentage of students eligible for free and reduced price lunch, numbers of full-time professional library media specialists employed at the school, access procedures, and library closure information. The survey response rate was 29.3% (176 respondents. Because fixed versus flexible scheduling is an issue that primarily affects elementary schools, the authors further narrowed their subject pool to 88 elementary school respondents. Data were analyzed using SPSS 16.0 statistical software. Correlation analysis, including the analysis of covariance (ANCOVA, was used to compare differences in the three scheduling types and to control for other variables (such as location, socioeconomic status, collection size, staffing, days closed, and others that may affect circulation.Main Results – Of the 88

  15. The role of abnormal fetal heart rate in scheduling chorionic villus sampling.

    Science.gov (United States)

    Yagel, S; Anteby, E; Ron, M; Hochner-Celnikier, D; Achiron, R

    1992-09-01

    To assess the value of fetal heart rate (FHR) measurements in predicting spontaneous fetal loss in pregnancies scheduled for chorionic villus sampling (CVS). A prospective descriptive study. Two hospital departments of obstetrics and gynaecology in Israel. 114 women between 9 and 11 weeks gestation scheduled for chorionic villus sampling (CVS). Fetal heart rate was measured by transvaginal Doppler ultrasound and compared with a monogram established from 75 fetuses. Whenever a normal FHR was recorded, CVS was performed immediately. 106 women had a normal FHR and underwent CVS; two of these pregnancies ended in miscarriage. In five pregnancies no fetal heart beats could be identified and fetal death was diagnosed. In three pregnancies an abnormal FHR was recorded and CVS was postponed; all three pregnancies ended in miscarriage within 2 weeks. Determination of FHR correlated with crown-rump length could be useful in predicting spontaneous miscarriage before performing any invasive procedure late in the first trimester.

  16. The Effects of Two Scheduling Formats on Student Achievement in a Suburban High School Setting

    Science.gov (United States)

    Jackson, Kenyada Morton

    2013-01-01

    Limited studies have been conducted on the relationship between scheduling formats and academic performance of high school students. At the target high school, students underperform on standardized tests in English language arts (ELA) and math. The purpose of this causal comparative quantitative study was to compare the means of ELA and math test…

  17. Dental Student Study Strategies: Are Self-Testing and Scheduling Related to Academic Performance?

    Science.gov (United States)

    McAndrew, Maureen; Morrow, Christina S; Atiyeh, Lindsey; Pierre, Gaëlle C

    2016-05-01

    Self-testing, a strategy wherein a student actively engages in creating questions and answers from study materials to assist with studying, has been found to be especially advantageous because it enhances future retrieval of information. Studies have found correlations among students' grade point averages (GPAs), self-testing, and rereading study strategies, as well as the spacing of study sessions over time. The aim of this study was to assess relationships among dental students' study strategies, scheduling of study time, and academic achievement. A 16-item survey requesting information on study habits, study schedules, and GPAs was distributed to 358 second-year dental students at New York University College of Dentistry. Additionally, the survey asked students to report the average number of hours per week they devoted to studying for didactic courses and preparing for hands-on preclinical courses. Of the 358 students, 94 (26%) responded to the survey. The vast majority of the respondents reported utilizing self-testing and rereading study strategies. High performers (with higher GPAs) were more likely to use self-testing, especially with flashcards, and to space their studying over multiple sessions. Lower performing students were more likely to highlight or underline their notes and to mass their study sessions or cram. Longer hours devoted to studying and practicing for simulation courses were associated with stronger performance; lower performers reported spending significantly fewer hours practicing for simulation courses. Half of the dental students surveyed said that they felt their studying would be more productive in the morning, although 84% reported doing most of their studying in the evening or late night. Sound study decisions depend on accurate regulation of ongoing learning and appropriate use and timing of evidence-based study strategies, so these results suggest that dental students may require guidance in these areas.

  18. Effect of Different Sampling Schedules on Results of Bioavailability and Bioequivalence Studies: Evaluation by Means of Monte Carlo Simulations.

    Science.gov (United States)

    Kano, Eunice Kazue; Chiann, Chang; Fukuda, Kazuo; Porta, Valentina

    2017-08-01

    Bioavailability and bioequivalence study is one of the most frequently performed investigations in clinical trials. Bioequivalence testing is based on the assumption that 2 drug products will be therapeutically equivalent when they are equivalent in the rate and extent to which the active drug ingredient or therapeutic moiety is absorbed and becomes available at the site of drug action. In recent years there has been a significant growth in published papers that use in silico studies based on mathematical simulations to analyze pharmacokinetic and pharmacodynamic properties of drugs, including bioavailability and bioequivalence aspects. The goal of this study is to evaluate the usefulness of in silico studies as a tool in the planning of bioequivalence, bioavailability and other pharmacokinetic assays, e.g., to determine an appropriate sampling schedule. Monte Carlo simulations were used to define adequate blood sampling schedules for a bioequivalence assay comparing 2 different formulations of cefadroxil oral suspensions. In silico bioequivalence studies comparing different formulation of cefadroxil oral suspensions using various sampling schedules were performed using models. An in vivo study was conducted to confirm in silico results. The results of in silico and in vivo bioequivalence studies demonstrated that schedules with fewer sampling times are as efficient as schedules with larger numbers of sampling times in the assessment of bioequivalence, but only if T max is included as a sampling time. It was also concluded that in silico studies are useful tools in the planning of bioequivalence, bioavailability and other pharmacokinetic in vivo assays. © Georg Thieme Verlag KG Stuttgart · New York.

  19. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  20. An investigation on impacts of scheduling configurations on Mississippi biology subject area testing

    Science.gov (United States)

    Marchette, Frances Lenora

    The purpose of this mixed modal study was to compare the results of Biology Subject Area mean scores of students on a 4 x 4 block schedule, A/B block schedule, and traditional year-long schedule for 1A to 5A size schools. This study also reviewed the data to determine if minority or gender issues might influence the test results. Interviews with administrators and teachers were conducted about the type of schedule configuration they use and the influence that the schedule has on student academic performance on the Biology Subject Area Test. Additionally, this research further explored whether schedule configurations allow sufficient time for students to construct knowledge. This study is important to schools, teachers, and administrators because it can assist them in considering the impacts that different types of class schedules have on student performance and if ethnic or gender issues are influencing testing results. This study used the causal-comparative method for the quantitative portion of the study and constant comparative method for the qualitative portion to explore the relationship of school schedules on student academic achievement on the Mississippi Biology Subject Area Test. The aggregate means of selected student scores indicate that the Mississippi Biology Subject Area Test as a measure of student performance reveals no significant difference on student achievement for the three school schedule configurations. The data were adjusted for initial differences of gender, minority, and school size on the three schedule configurations. The results suggest that schools may employ various schedule configurations and expect student performance on the Mississippi Biology Subject Area Test to be unaffected. However, many areas of concern were identified in the interviews that might impact on school learning environments. These concerns relate to effective classroom management, the active involvement of students in learning, the adequacy of teacher education

  1. Quality-aware scheduling for key-value data stores

    CERN Document Server

    Xu, Chen

    2015-01-01

    This book comprehensively illustrates quality-ware scheduling in key-value stores. In addition, it provides scheduling strategies and a prototype framework of quality-aware scheduler as well as a demonstration of online applications. The book offers a rich blend of theory and practice which is suitable for students, researchers and practitioners interested in distributed systems, NoSQL key-value stores and scheduling.

  2. Traditional/Block Scheduling, Gender, and Test Scores in College Biology Course

    Science.gov (United States)

    Huelskamp, Diana

    2014-01-01

    Block scheduling is the reallocation of a school day into longer class sessions to allow for more active teaching strategies and active engagement of students, in the effort to increase student performance. Various types of block scheduling exist. Traditional scheduling is when the school day is divided into six to eight sessions, with each…

  3. A Multilevel Analysis of the Association of Class Schedule with Student Outcomes in Community College Developmental Math

    Science.gov (United States)

    Fike, David S.; Fike, Renea

    2013-01-01

    This study focused on assessing the relationship of class scheduling with student outcomes in Intermediate Algebra, the prerequisite course for College Algebra. Numerous studies of information processing theory and the spacing effect on learning have been conducted; they have produced mixed findings. Relatively few studies have been conducted to…

  4. A NEW APPROACH TO CLASS SCHEDULING. FINAL REPORT.

    Science.gov (United States)

    CANTER, JOHN; AND OTHERS

    AN INVESTIGATION OF THE USE OF A PROTOTYPE DEVICE FOR CLASS SCHEDULING WAS MADE. THE BEEKLEY INSITE DEVICE THAT WAS STUDIED USES THE "PEEK-A-BOO" PRINCIPLE OF MATCHING COMPUTER TAPES. A TEST GROUP OF 149 GRADUATE STUDENTS WAS USED. THEIR DESIRED SCHEDULES WERE MATCHED AUTOMATICALLY AGAINST A PROPOSED MASTER SCHEDULE TO EVALUATE THE…

  5. Improving the image of student-recruited samples : a commentary

    NARCIS (Netherlands)

    Demerouti, E.; Rispens, S.

    2014-01-01

    This commentary argues that the quality and usefulness of student-recruited data can be evaluated by examining the external validity and generalization issues related to this sampling method. Therefore, we discuss how the sampling methods of student- and non-student-recruited samples can enhance or

  6. Perceptions of Teachers in South Florida Toward Block Scheduling.

    Science.gov (United States)

    Hamdy, Mona; Urich, Ted

    1998-01-01

    A study was conducted at two metropolitan South Florida high schools to determine perceptions of 100 teachers concerning block scheduling. Teachers felt that the 4 X 4 block schedule contained too many time gaps for teaching foreign languages, English, and math. Teachers believed block schedules benefitted advanced students more than others and…

  7. PLACEMENT APPLICATIONS SCHEDULING LECTURE IN INTERNATIONAL PROGRAM UNIKOM BASED ANDROID

    Directory of Open Access Journals (Sweden)

    Andri Sahata Sitanggang

    2017-12-01

    Full Text Available One who determines life of a classroom namely mapping scheduling courses especially at college. The process scheduling has included time or schedule of a class of available, room available, lecture who is scheduled for, and schedule for lecturer going to teach. Hopefully with a scheduling it will facilitate the students and teachers in obtaining information lecture schedule. With the emergence of the android application ( is implanted in mobile phones , the public can now use the internet so fast that is based .So with that researchers give one a technology based solutions to build android application .This is because one of the technology has given the functions which may make it easier for students and university lecturers in terms of access to information. In building this application used method of the prototype consisting 2 access namely access user and admin , where module user consisting of modules register , login , scheduling module , while for admin given module login , register and arrangement information scheduling courses both the administration and lecturers .Application made will be integrated with internet so that this program is real-time application.

  8. The Rathus Assertiveness Schedule: Reliability at the Junior High School Level

    Science.gov (United States)

    Vaal, Joseph J.; McCullagh, James

    1977-01-01

    This research was an attempt to determine the usefullness of the Rathus Assertiveness Schedule with pre-adolescent and early adolescent students. Previously it has been used with outpatients, institutionalized adults, or with college students. The RAS is a thirty item schedule that was developed for measuring assertiveness. (Author/RK)

  9. "Creative" Work Schedules.

    Science.gov (United States)

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  10. College Students Understanding of Production Management and Master Production Schedule through Using a Real World Tool, Complimented with Company Tours and In- Class Visits, Provides an Excellent Learning Experience at Farmingdale State College

    Directory of Open Access Journals (Sweden)

    Jill Anne O'Sullivan

    2015-08-01

    Full Text Available Manufacturing is playing a significant role in its re-shoring into America. Companies are grappling with ways to obtain that competitive advantage by distinguishing themselves through their intellectual capabilities, process improvements, technology, people, shop floor management and information flows. The purpose of this paper is to describe the effort at Farmingdale State College to educate our students in understanding Production Management and Master Production Schedule (MPS. We are trying to prepare students for entry into the workforce. By using a Real world ERP tool in the classroom while complimenting this learning with touring local manufacturers who use this tool and having production control experts in our classrooms. [1] The opportunity presents itself for these students to visit real world manufacturers using the same tool these students use in the classroom, the Infor Visual ERP. Each semester students go to a local manufacturer to see how the product is made and the ERP system is used to make it. Each semester a subject matter expert, SME, in manufacturing comes into the class and talks about how they use their ERP to perform their functional responsibilities. Students go into these companies and sit down with these Production Manufacturing and IT SME's to see how they use the modules in their ERP system from estimating, Production Management, MPS to delivery and payment. From the manufacturing window to the Master Schedule Window students learn from these companies SME's just how they perform their functions, how they use this tool. Then that is replicated this in the classroom lab assignments for students to better understand Production Management, scheduling and work order integrity. They identify the desired schedule (forecast and populate a Master Production Schedule. They create a BOM with work orders adding operations and material. The Production Management/Control is the function of directing or regulating the movement of

  11. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  12. Examining Master Schedule Practices in Rio Grande Valley Schools: Effects on Student Attendance, Discipline, and Grade Point Averages

    Science.gov (United States)

    Carriaga, Benito T.

    2012-01-01

    This study evaluated the impact of the master schedule design on student attendance, discipline, and grade point averages. Unexcused and excused absences, minor and major infraction, and grade point averages in three high schools during the 2008-09 and 2009-10 school years were included in the study. The purpose was to examine if any difference…

  13. Prevalence of α(+)-Thalassemia in the Scheduled Tribe and Scheduled Caste Populations of Damoh District in Madhya Pradesh, Central India.

    Science.gov (United States)

    Singh, Mendi P S S; Gupta, Rasik B; Yadav, Rajiv; Sharma, Ravendra K; Shanmugam, Rajasubramaniam

    2016-08-01

    This study was carried out to ascertain the allelic frequency of α(+)-thalassemia (α(+)-thal) in Scheduled caste and scheduled tribe populations of the Damoh district of Madhya Pradesh, India. Random blood samples of Scheduled tribe (267) and Scheduled caste (168), considering the family as a sampling unit, were analyzed for the presence of the -α(3.7) (rightward) (NG_000006.1: g.34164_37967del3804) and -α(4.2) (leftward) (AF221717) deletions. α(+)-Thal was significantly higher in the Scheduled tribals (77.9%) as compared to the scheduled caste population (9.0%). About 58.0% scheduled tribals carried at least one chromosome with the -α(3.7) deletion and 20.0% scheduled tribals carried the -α(4.2) deletion. Frequency for the -α(3.7) allele was 0.487 in the scheduled tribal populations in comparison to 0.021 in scheduled castes. Allelic frequency for -α(4.2) was 0.103 and 0.024, respectively, in the above communities. No Hardy-Weinberg equilibrium for α-thal gene (p population, indicating the presence of selection pressures in favor of α-thal mutation and adaptation.

  14. The Vocational Interests of a Sample of Optometry Students.

    Science.gov (United States)

    Emling, Robert C.; And Others

    1981-01-01

    The Strong-Campbell Interest Inventory, with a vocational title called Optometry, was used to profile a sample of second-year optometry students and to compare them with samples of practicing optometrists. One conclusion questions these students' compatibility with older practitioners. (MLW)

  15. Fixed Schedules Can Support 21st-Century Skills

    Science.gov (United States)

    Formanack, Gail; Pietsch, Laura

    2011-01-01

    The common belief among school librarians is that a flexibly scheduled school library program as opposed to a fixed schedule program is the best choice. After all, there are distinct advantages to the flexible program: students are served at the point of need, skills are not taught in isolation, and collaborative lessons are developed with…

  16. Examining the Factor Structure of the Positive and Negative Affect Schedule (PANAS) in a Multiethnic Sample of Adolescents

    Science.gov (United States)

    Villodas, Feion; Villodas, Miguel T.; Roesch, Scott

    2011-01-01

    The psychometric properties of the Positive and Negative Affect Schedule were examined in a multiethnic sample of adolescents. Results from confirmatory factor analyses indicated that the original two-factor model did not adequately fit the data. Exploratory factor analyses revealed that four items were not pure markers of the factors. (Contains 1…

  17. A Psychometric Analysis of the Positive and Negative Affect Schedule for Children-Parent Version in a School Sample

    Science.gov (United States)

    Ebesutani, Chad; Okamura, Kelsie; Higa-McMillan, Charmaine; Chorpita, Bruce F.

    2011-01-01

    The current study was the 1st to examine the psychometric properties of the Positive and Negative Affect Schedule for Children-Parent Version (PANAS-C-P) using a large school-based sample of children and adolescents ages 8 to 18 (N = 606). Confirmatory factor analysis supported a 2-factor (correlated) model of positive affect (PA) and negative…

  18. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  19. Fault Sample Generation for Virtual Testability Demonstration Test Subject to Minimal Maintenance and Scheduled Replacement

    Directory of Open Access Journals (Sweden)

    Yong Zhang

    2015-01-01

    Full Text Available Virtual testability demonstration test brings new requirements to the fault sample generation. First, fault occurrence process is described by stochastic process theory. It is discussed that fault occurrence process subject to minimal repair is nonhomogeneous Poisson process (NHPP. Second, the interarrival time distribution function of the next fault event is proposed and three typical kinds of parameterized NHPP are discussed. Third, the procedure of fault sample generation is put forward with the assumptions of minimal maintenance and scheduled replacement. The fault modes and their occurrence time subject to specified conditions and time period can be obtained. Finally, an antenna driving subsystem in automatic pointing and tracking platform is taken as a case to illustrate the proposed method. Results indicate that both the size and structure of the fault samples generated by the proposed method are reasonable and effective. The proposed method can be applied to virtual testability demonstration test well.

  20. ATTITUDE TOWARDS ONLINE RETAILING SERVICES: A COMPARISON OF STUDENT AND NON-STUDENT SAMPLES

    OpenAIRE

    Siohong Tih; Sean Ennis; June M. L. Poon

    2008-01-01

    This study examined the adequacy of using undergraduate student samples in research on online consumer attitudes by comparing the attitudes of students (n = 161) towards online retailing services with the attitudes of non-students (n = 252) towards such services. A structured questionnaire administered online was used to gather data on perceptions, satisfaction, and behavioral intentions with regard to online retailing services. The t-test results showed that, in general, students' attitude t...

  1. ATTITUDE TOWARDS ONLINE RETAILING SERVICES: A COMPARISON OF STUDENT AND NON-STUDENT SAMPLES

    Directory of Open Access Journals (Sweden)

    Siohong Tih

    2008-01-01

    Full Text Available This study examined the adequacy of using undergraduate student samples in research on online consumer attitudes by comparing the attitudes of students (n = 161 towards online retailing services with the attitudes of non-students (n = 252 towards such services. A structured questionnaire administered online was used to gather data on perceptions, satisfaction, and behavioral intentions with regard to online retailing services. The t-test results showed that, in general, students' attitude towards online retailing services is similar to that of non-students. Therefore, undergraduate students may be reasonable surrogates for consumers in research on online retailing.

  2. Scheduling whole-air samples above the Trade Wind Inversion from SUAS using real-time sensors

    Science.gov (United States)

    Freer, J. E.; Greatwood, C.; Thomas, R.; Richardson, T.; Brownlow, R.; Lowry, D.; MacKenzie, A. R.; Nisbet, E. G.

    2015-12-01

    Small Unmanned Air Systems (SUAS) are increasingly being used in science applications for a range of applications. Here we explore their use to schedule the sampling of air masses up to 2.5km above ground using computer controlled bespoked Octocopter platforms. Whole-air sampling is targeted above, within and below the Trade Wind Inversion (TWI). On-board sensors profiled the TWI characteristics in real time on ascent and, hence, guided the altitudes at which samples were taken on descent. The science driver for this research is investigation of the Southern Methane Anomaly and, more broadly, the hemispheric-scale transport of long-lived atmospheric tracers in the remote troposphere. Here we focus on the practical application of SUAS for this purpose. Highlighting the need for mission planning, computer control, onboard sensors and logistics in deploying such technologies for out of line-of-sight applications. We show how such a platform can be deployed successfully, resulting in some 60 sampling flights within a 10 day period. Challenges remain regarding the deployment of such platforms routinely and cost-effectively, particularly regarding training and support. We present some initial results from the methane sampling and its implication for exploring and understanding the Southern Methane Anomaly.

  3. Master schedule for CY-1982 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites

  4. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  5. Nonuniform sampling by quantiles

    Science.gov (United States)

    Craft, D. Levi; Sonstrom, Reilly E.; Rovnyak, Virginia G.; Rovnyak, David

    2018-03-01

    A flexible strategy for choosing samples nonuniformly from a Nyquist grid using the concept of statistical quantiles is presented for broad classes of NMR experimentation. Quantile-directed scheduling is intuitive and flexible for any weighting function, promotes reproducibility and seed independence, and is generalizable to multiple dimensions. In brief, weighting functions are divided into regions of equal probability, which define the samples to be acquired. Quantile scheduling therefore achieves close adherence to a probability distribution function, thereby minimizing gaps for any given degree of subsampling of the Nyquist grid. A characteristic of quantile scheduling is that one-dimensional, weighted NUS schedules are deterministic, however higher dimensional schedules are similar within a user-specified jittering parameter. To develop unweighted sampling, we investigated the minimum jitter needed to disrupt subharmonic tracts, and show that this criterion can be met in many cases by jittering within 25-50% of the subharmonic gap. For nD-NUS, three supplemental components to choosing samples by quantiles are proposed in this work: (i) forcing the corner samples to ensure sampling to specified maximum values in indirect evolution times, (ii) providing an option to triangular backfill sampling schedules to promote dense/uniform tracts at the beginning of signal evolution periods, and (iii) providing an option to force the edges of nD-NUS schedules to be identical to the 1D quantiles. Quantile-directed scheduling meets the diverse needs of current NUS experimentation, but can also be used for future NUS implementations such as off-grid NUS and more. A computer program implementing these principles (a.k.a. QSched) in 1D- and 2D-NUS is available under the general public license.

  6. Secondary School Students' Reasoning about Conditional Probability, Samples, and Sampling Procedures

    Science.gov (United States)

    Prodromou, Theodosia

    2016-01-01

    In the Australian mathematics curriculum, Year 12 students (aged 16-17) are asked to solve conditional probability problems that involve the representation of the problem situation with two-way tables or three-dimensional diagrams and consider sampling procedures that result in different correct answers. In a small exploratory study, we…

  7. Implicit Leadership Theory: Are Results Generalizable from Student to Professional Samples?

    Science.gov (United States)

    Singer, Ming

    1990-01-01

    Explores whether student subjects' implicit leadership theories are generalizable to professional subjects. Samples consisted of 220 undergraduates and 152 government employees in New Zealand. Finds the mean importance ratings were similar for the 2 samples, except students placed greater importance on factors beyond individual control. (DB)

  8. An Automatic Course Scheduling Approach Using Instructors' Preferences

    Directory of Open Access Journals (Sweden)

    Hossam Faris

    2012-03-01

    Full Text Available University Courses Timetabling problem has been extensively researched in the last decade. Therefore, numerous approaches were proposed to solve UCT problem. This paper proposes a new approach to process a sequence of meetings between instructors, rooms, and students in predefined periods of time with satisfying a set of constraints divided in variety of types. In addition, this paper proposes new representation for courses timetabling and conflict-free for each time slot by mining instructor preferences from previous schedules to avoid undesirable times for instructors. Experiments on different real data showed the approach achieved increased satisfaction degree for each instructor and gives feasible schedule with satisfying all hard constraints in construction operation. The generated schedules have high satisfaction degrees comparing with schedules created manually. The research conducts experiments on collected data gathered from the computer science department and other related departments in Jordan University of Science and Technology- Jordan.

  9. Automated Scheduling of Personnel to Staff Operations for the Mars Science Laboratory

    Science.gov (United States)

    Knight, Russell; Mishkin, Andrew; Allbaugh, Alicia

    2014-01-01

    Leveraging previous work on scheduling personnel for space mission operations, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] to the domain of scheduling personnel for operations of the Mars Science Laboratory. Automated scheduling of personnel is not new. We compare our representations to a sampling of employee scheduling systems available with respect to desired features. We described the constraints required by MSL personnel schedulers and how each is handled by the scheduling algorithm.

  10. The experience sampling method: Investigating students' affective experience

    Science.gov (United States)

    Nissen, Jayson M.; Stetzer, MacKenzie R.; Shemwell, Jonathan T.

    2013-01-01

    Improving non-cognitive outcomes such as attitudes, efficacy, and persistence in physics courses is an important goal of physics education. This investigation implemented an in-the-moment surveying technique called the Experience Sampling Method (ESM) [1] to measure students' affective experience in physics. Measurements included: self-efficacy, cognitive efficiency, activation, intrinsic motivation, and affect. Data are presented that show contrasts in students' experiences (e.g., in physics vs. non-physics courses).

  11. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  12. Aspects of Students' Reasoning about Variation in Empirical Sampling Distributions

    Science.gov (United States)

    Noll, Jennifer; Shaughnessy, J. Michael

    2012-01-01

    Sampling tasks and sampling distributions provide a fertile realm for investigating students' conceptions of variability. A project-designed teaching episode on samples and sampling distributions was team-taught in 6 research classrooms (2 middle school and 4 high school) by the investigators and regular classroom mathematics teachers. Data…

  13. An introduction to optimal satellite range scheduling

    CERN Document Server

    Vázquez Álvarez, Antonio José

    2015-01-01

    The satellite range scheduling (SRS) problem, an important operations research problem in the aerospace industry consisting of allocating tasks among satellites and Earth-bound objects, is examined in this book. SRS principles and solutions are applicable to many areas, including: Satellite communications, where tasks are communication intervals between sets of satellites and ground stations Earth observation, where tasks are observations of spots on the Earth by satellites Sensor scheduling, where tasks are observations of satellites by sensors on the Earth. This self-contained monograph begins with a structured compendium of the problem and moves on to explain the optimal approach to the solution, which includes aspects from graph theory, set theory, game theory and belief networks. This book is accessible to students, professionals and researchers in a variety of fields, including: operations research, optimization, scheduling theory, dynamic programming and game theory. Taking account of the distributed, ...

  14. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  15. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  16. The impact of a scheduling change on ninth grade high school performance on biology benchmark exams and the California Standards Test

    Science.gov (United States)

    Leonardi, Marcelo

    The primary purpose of this study was to examine the impact of a scheduling change from a trimester 4x4 block schedule to a modified hybrid schedule on student achievement in ninth grade biology courses. This study examined the impact of the scheduling change on student achievement through teacher created benchmark assessments in Genetics, DNA, and Evolution and on the California Standardized Test in Biology. The secondary purpose of this study examined the ninth grade biology teacher perceptions of ninth grade biology student achievement. Using a mixed methods research approach, data was collected both quantitatively and qualitatively as aligned to research questions. Quantitative methods included gathering data from departmental benchmark exams and California Standardized Test in Biology and conducting multiple analysis of covariance and analysis of covariance to determine significance differences. Qualitative methods include journal entries questions and focus group interviews. The results revealed a statistically significant increase in scores on both the DNA and Evolution benchmark exams. DNA and Evolution benchmark exams showed significant improvements from a change in scheduling format. The scheduling change was responsible for 1.5% of the increase in DNA benchmark scores and 2% of the increase in Evolution benchmark scores. The results revealed a statistically significant decrease in scores on the Genetics Benchmark exam as a result of the scheduling change. The scheduling change was responsible for 1% of the decrease in Genetics benchmark scores. The results also revealed a statistically significant increase in scores on the CST Biology exam. The scheduling change was responsible for .7% of the increase in CST Biology scores. Results of the focus group discussions indicated that all teachers preferred the modified hybrid schedule over the trimester schedule and that it improved student achievement.

  17. Estimated mental retardation and school dropout in a sample of students from state public schools in Porto Alegre, Brazil

    Directory of Open Access Journals (Sweden)

    Tramontina Silzá

    2002-01-01

    Full Text Available OBJECTIVES: To assess the association between estimated Mental Retardation (MR and school dropout in a sample of students of the third and fourth grades at state schools in Porto Alegre, the capital of the southernmost state of Brazil. METHOD: In this case - control study, students that dropped out from schools (n=44 and a control group who continued attending schools (n=44 had their intelligence quotient (IQ determined by the vocabulary and cubes subtests of the Wescheler Intelligence Scale fraction three-quarters third edition (WISCfraction three-quartersIII. Students with IQ lower than 70 were considered as potential cases of MR. Other prevalent mental disorders in this age range were assessed in both groups using the Schedule for Affective Disorders and Schizophrenia for Schoolfraction three-quarters Age Children, Epidemiological Version (K-SADS-E. RESULTS: The prevalence of potential MR was significantly higher in the dropped out group than in the control group (p<0.001. Odds ratio for school dropout was significantly higher in the presence of MR even after controlling for potentially confounding factors (age, conduct disorder, grade repetition, family structure and income (p<0.01. CONCLUSION: Children with IQ lower than 70 (potential MR were at higher risk for school dropout. These children need to be identified at school and specific educational strategies should be implemented to assure their inclusion in the learning process.

  18. Use of Perceive, Recall, Plan, Perform Stage Two Cognitive Task Analysis for Students with Autism and Intellectual Disability: The Impact of a Sensory Activity Schedule

    Science.gov (United States)

    Mills, Caroline; Chapparo, Christine

    2017-01-01

    The aim of this study was to determine the impact of a classroom sensory activity schedule (SAS) on cognitive strategy use during task performance. This work studies a single-system AB research design with seven students with autism and intellectual disability. Repeated measures using the Perceive, Recall, Plan and Perform (PRPP) Cognitive Task…

  19. Social Bond Theory and Drunk Driving in a Sample of College Students

    Science.gov (United States)

    Durkin, Keith F.; Wolfe, Scott E.; May, Ross W.

    2007-01-01

    This paper reports the finding from a study that examined the relationship between social bond variables and drunk driving in a sample of university students. A questionnaire containing indicators representing social bond variables, as well as a measure of drunk driving was administered to a sample of 1459 college students. The results of this…

  20. Sleep duration, schedule and quality among urban Chinese children and adolescents: associations with routine after-school activities.

    Directory of Open Access Journals (Sweden)

    Xiaoxiao Jiang

    Full Text Available BACKGROUND: With rapid urbanization accompanied by lifestyle changes, children and adolescents living in metropolitan areas are faced with many time use choices that compete with sleep. This study reports on the sleep hygiene of urban Chinese school students, and investigates the relationship between habitual after-school activities and sleep duration, schedule and quality on a regular school day. METHODS: Cross-sectional, school-based survey of school children (Grades 4-8 living in Shanghai, China, conducted in 2011. Self-reported data were collected on students' sleep duration and timing, sleep quality, habitual after-school activities (i.e. homework, leisure-time physical activity, recreational screen time and school commuting time, and potential correlates. RESULTS: Mean sleep duration of this sample (mean age: 11.5-years; 48.6% girls was 9 hours. Nearly 30% of students reported daytime tiredness. On school nights, girls slept less (p<0.001 and went to bed later (p<0.001, a sex difference that was more pronounced in older students. Age by sex interactions were observed for both sleep duration (p=0.005 and bedtime (p=0.002. Prolonged time spent on homework and mobile phone playing was related to shorter sleep duration and later bedtime. Adjusting for all other factors, with each additional hour of mobile phone playing, the odds of daytime tiredness and having difficulty maintaining sleep increased by 30% and 27% among secondary students, respectively. CONCLUSION: There are sex differences in sleep duration, schedule and quality. Habitual activities had small but significant associations with sleep hygiene outcomes especially among secondary school students. Intervention strategies such as limiting children's use of electronic screen devices after school are implicated.

  1. Why Girl Students Achieve English Presentation Learning Significantly Better in Shanghai University of Engineering Science (SUES)

    Science.gov (United States)

    Zhu, Wen; Liu, Zhixin

    2017-01-01

    In non literature major dominated university, it is obviously noted that girl students' English (as the second language) presentation scores often higher than boy students in the same teaching environment and evaluation system. A 397 samples' survey has been studied from the aspects of after school activities and sleep schedule to discuss if any…

  2. Relationships between Classroom Schedule Types and Performance on the Algebra I Criterion-Referenced Test

    Science.gov (United States)

    Murray, Gregory V.; Moyer-Packenham, Patricia S.

    2014-01-01

    One option for length of individual mathematics class periods is the schedule type selected for Algebra I classes. This study examined the relationship between student achievement, as indicated by Algebra I Criterion-Referenced Test scores, and the schedule type for Algebra I classes. Data obtained from the Utah State Office of Education included…

  3. Developing Students' Reasoning about Samples and Sampling Variability as a Path to Expert Statistical Thinking

    Science.gov (United States)

    Garfield, Joan; Le, Laura; Zieffler, Andrew; Ben-Zvi, Dani

    2015-01-01

    This paper describes the importance of developing students' reasoning about samples and sampling variability as a foundation for statistical thinking. Research on expert-novice thinking as well as statistical thinking is reviewed and compared. A case is made that statistical thinking is a type of expert thinking, and as such, research…

  4. The Offering, Scheduling and Maintenance of Elective Advanced Pharmacy Practice Experiences

    Directory of Open Access Journals (Sweden)

    Rex O. Brown

    2015-12-01

    Full Text Available The Accreditation Council for Pharmacy Education (ACPE provides standards for colleges of pharmacy to assist in the provision of pharmacy education to student pharmacists. An integral part of all college educational programs includes the provision of experiential learning. Experiential learning allows students to gain real-world experience in direct patient care during completion of the curriculum. All college of pharmacy programs provide several Advanced Pharmacy Practice Experiences (APPEs, which include a balance between the four required experiences and a number of other required or elective APPEs. Required APPEs include advanced community, advanced institutional, ambulatory care, and general medicine. The elective APPEs include a myriad of opportunities to help provide a balanced education in experiential learning for student pharmacists. These unique opportunities help to expose student pharmacists to different career tracks that they may not have been able to experience otherwise. Not all colleges offer enough elective APPEs to enable the student pharmacist to obtain experiences in a defined area. Such an approach is required to produce skilled pharmacy graduates that are capable to enter practice in various settings. Elective APPEs are scheduled logically and are based upon student career interest and site availability. This article describes the offering, scheduling and maintenance of different elective APPEs offered by The University of Tennessee College of Pharmacy.

  5. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  6. Comparison Performance of Genetic Algorithm and Ant Colony Optimization in Course Scheduling Optimizing

    Directory of Open Access Journals (Sweden)

    Imam Ahmad Ashari

    2016-11-01

    Full Text Available Scheduling problems at the university is a complex type of scheduling problems. The scheduling process should be carried out at every turn of the semester's. The core of the problem of scheduling courses at the university is that the number of components that need to be considered in making the schedule, some of the components was made up of students, lecturers, time and a room with due regard to the limits and certain conditions so that no collision in the schedule such as mashed room, mashed lecturer and others. To resolve a scheduling problem most appropriate technique used is the technique of optimization. Optimization techniques can give the best results desired. Metaheuristic algorithm is an algorithm that has a lot of ways to solve the problems to the very limit the optimal solution. In this paper, we use a genetic algorithm and ant colony optimization algorithm is an algorithm metaheuristic to solve the problem of course scheduling. The two algorithm will be tested and compared to get performance is the best. The algorithm was tested using data schedule courses of the university in Semarang. From the experimental results we conclude that the genetic algorithm has better performance than the ant colony optimization  algorithm in solving the case of course scheduling.

  7. A case study: the initiative to improve RN scheduling at Hamilton Health Sciences.

    Science.gov (United States)

    Wallace, Laurel-Anne; Pierson, Sharon

    2008-01-01

    In 2003, Hamilton Health Sciences embarked on an initiative to improve and standardize nursing schedules and scheduling practices. The scheduling project was one of several initiatives undertaken by a corporate-wide Nursing Resource Group established to enhance the work environment and patient care and to ensure appropriate utilization of nursing resources across the organization's five hospitals. This article focuses on major activities undertaken in the scheduling initiative. The step-by-step approach described, plus examples of the scheduling resources developed and samples of extended-tour schedules, will all provide insight, potential strategies and practical help for nursing administrators, human resources (HR) personnel and others interested in improving nurse scheduling.

  8. Content Analysis Schedule for Bilingual Education Programs: Proyecto PAL.

    Science.gov (United States)

    Gonzalez, Castor

    This content analysis schedule for "Proyecto PAL" in San Jose, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic…

  9. Data analysis considerations for pesticides determined by National Water Quality Laboratory schedule 2437

    Science.gov (United States)

    Shoda, Megan E.; Nowell, Lisa H.; Stone, Wesley W.; Sandstrom, Mark W.; Bexfield, Laura M.

    2018-04-02

    In 2013, the U.S. Geological Survey National Water Quality Laboratory (NWQL) made a new method available for the analysis of pesticides in filtered water samples: laboratory schedule 2437. Schedule 2437 is an improvement on previous analytical methods because it determines the concentrations of 225 fungicides, herbicides, insecticides, and associated degradates in one method at similar or lower concentrations than previously available methods. Additionally, the pesticides included in schedule 2437 were strategically identified in a prioritization analysis that assessed likelihood of occurrence, prevalence of use, and potential toxicity. When the NWQL reports pesticide concentrations for analytes in schedule 2437, the laboratory also provides supplemental information useful to data users for assessing method performance and understanding data quality. That supplemental information is discussed in this report, along with an initial analysis of analytical recovery of pesticides in water-quality samples analyzed by schedule 2437 during 2013–2015. A total of 523 field matrix spike samples and their paired environmental samples and 277 laboratory reagent spike samples were analyzed for this report (1,323 samples total). These samples were collected in the field as part of the U.S. Geological Survey National Water-Quality Assessment groundwater and surface-water studies and as part of the NWQL quality-control program. This report reviews how pesticide samples are processed by the NWQL, addresses how to obtain all the data necessary to interpret pesticide concentrations, explains the circumstances that result in a reporting level change or the occurrence of a raised reporting level, and describes the calculation and assessment of recovery. This report also discusses reasons why a data user might choose to exclude data in an interpretive analysis and outlines the approach used to identify the potential for decreased data quality in the assessment of method recovery. The

  10. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  11. Simulated Job Samples: A Student-Centered Approach to Vocational Exploration and Evaluation.

    Science.gov (United States)

    Richter-Stein, Caryn; Stodden, Robert A.

    1981-01-01

    Incorporating simulated job samples into the junior high school curriculum can provide vocational exploration opportunities as well as assessment data on special needs students. Students can participate as active learners and decision makers. (CL)

  12. Sampling strategies and stopping criteria for stochastic dual dynamic programming: a case study in long-term hydrothermal scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Homem-de-Mello, Tito [University of Illinois at Chicago, Department of Mechanical and Industrial Engineering, Chicago, IL (United States); Matos, Vitor L. de; Finardi, Erlon C. [Universidade Federal de Santa Catarina, LabPlan - Laboratorio de Planejamento de Sistemas de Energia Eletrica, Florianopolis (Brazil)

    2011-03-15

    The long-term hydrothermal scheduling is one of the most important problems to be solved in the power systems area. This problem aims to obtain an optimal policy, under water (energy) resources uncertainty, for hydro and thermal plants over a multi-annual planning horizon. It is natural to model the problem as a multi-stage stochastic program, a class of models for which algorithms have been developed. The original stochastic process is represented by a finite scenario tree and, because of the large number of stages, a sampling-based method such as the Stochastic Dual Dynamic Programming (SDDP) algorithm is required. The purpose of this paper is two-fold. Firstly, we study the application of two alternative sampling strategies to the standard Monte Carlo - namely, Latin hypercube sampling and randomized quasi-Monte Carlo - for the generation of scenario trees, as well as for the sampling of scenarios that is part of the SDDP algorithm. Secondly, we discuss the formulation of stopping criteria for the optimization algorithm in terms of statistical hypothesis tests, which allows us to propose an alternative criterion that is more robust than that originally proposed for the SDDP. We test these ideas on a problem associated with the whole Brazilian power system, with a three-year planning horizon. (orig.)

  13. Machine scheduling to minimize weighted completion times the use of the α-point

    CERN Document Server

    Gusmeroli, Nicoló

    2018-01-01

    This work reviews the most important results regarding the use of the α-point in Scheduling Theory. It provides a number of different LP-relaxations for scheduling problems and seeks to explain their polyhedral consequences. It also explains the concept of the α-point and how the conversion algorithm works, pointing out the relations to the sum of the weighted completion times. Lastly, the book explores the latest techniques used for many scheduling problems with different constraints, such as release dates, precedences, and parallel machines. This reference book is intended for advanced undergraduate and postgraduate students who are interested in scheduling theory. It is also inspiring for researchers wanting to learn about sophisticated techniques and open problems of the field.

  14. Quality of Life and Emotional Intelligence in a Sample of Kuwait University Students

    Science.gov (United States)

    Al-Huwailah, Amthal

    2017-01-01

    The purpose of the study is to describe of the nature of the relationship between quality of Life and Emotional Intelligence in a sample of Kuwait University students, as well as to identify the differences between males and females in the variables of the study, The study sample consists of 400 students from the University of Kuwait, (200) males…

  15. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  16. Prevalence of At-Risk Drinking among a National Sample of Medical Students

    Science.gov (United States)

    Shah, Ameet Arvind; Bazargan-Hejazi, Shahrzad; Lindstrom, Richard W.; Wolf, Kenneth E.

    2009-01-01

    As limited research exists on medical students' substance use patterns, including over-consumption of alcohol, the objective of this study was to determine prevalence and correlates of at-risk drinking among a national sample of medical students, using a cross-sectional, anonymous, Web-based survey. A total of 2710 medical students from 36 U.S.…

  17. Exercise motives in a sample of Brazilian university students

    Directory of Open Access Journals (Sweden)

    Dartagnan Pinto Guedes

    2013-09-01

    Full Text Available The present study aimed to identify the exercise motives according to selected socio-demographic indicators in university students. The sample was comprised of 2,380 individuals (1,213 men and 1,167 women aged between 18 and 35 years. The exercise motives were identified with the Portuguese-translated version of the Exercise Motivations Inventory (EMI-2. University students gave significantly greater importance to exercise for reasons identified as Disease Prevention. Factors that are less relevant in statistical language were identified in a context of motivation associated with Social Recognition and Competition. Sex, age, family economic class, experience with exercise and body weight had a significant effect on the level of importance of exercise among university students. In conclusion, the results found can contribute to the development of physical activity promotion programs and a possible reduction in the number of dropouts among university students.

  18. 76 FR 20718 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2011-04-13

    ...: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle... request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle Management Division (NWML..., rosters, test scores, student awards, and disciplinary documents. 11. Department of Housing and Urban...

  19. Alcohol consumption, sleep, and academic performance among college students.

    Science.gov (United States)

    Singleton, Royce A; Wolfson, Amy R

    2009-05-01

    Three independent lines of inquiry have found associations between alcohol use and academic performance, sleep and academic performance, and alcohol use and sleep. The present study bridges this research by examining the links among alcohol use, sleep, and academic performance in college students. Personal interview surveys were conducted with a random sample of 236 students (124 women) at a liberal arts college. The interviews measured alcohol consumption, gender, academic class, weekday and weekend bedtimes and rise times, and daytime sleepiness; 95% of the sample granted permission to obtain grade-point average (GPA) and Scholastic Aptitude Test (SAT) scores from official college records. Ordinary least squares regressions showed that alcohol consumption was a significant predictor of four sleep patterns: the duration of sleep, the timing of sleep, the difference between weekday and weekend nighttime sleep hours (oversleep), and the difference between weekday and weekend bedtimes (bedtime delay). Women and students with late sleep schedules were more apt to report daytime sleepiness. SAT score was the strongest predictor of GPA. However, gender, alcohol consumption, sleep duration, and daytime sleepiness also were significant predictors when other variables were controlled. In addition to alcohol's direct relationship with GPA, mediational analysis indicated that alcohol had indirect effects on sleepiness and GPA, primarily through its effect on sleep schedule. The findings show how alcohol use among college students is related to sleep-wake patterns and further support the connection between alcohol use and grades.

  20. Concurrent variable-interval variable-ratio schedules in a dynamic choice environment.

    Science.gov (United States)

    Bell, Matthew C; Baum, William M

    2017-11-01

    Most studies of operant choice have focused on presenting subjects with a fixed pair of schedules across many experimental sessions. Using these methods, studies of concurrent variable- interval variable-ratio schedules helped to evaluate theories of choice. More recently, a growing literature has focused on dynamic choice behavior. Those dynamic choice studies have analyzed behavior on a number of different time scales using concurrent variable-interval schedules. Following the dynamic choice approach, the present experiment examined performance on concurrent variable-interval variable-ratio schedules in a rapidly changing environment. Our objectives were to compare performance on concurrent variable-interval variable-ratio schedules with extant data on concurrent variable-interval variable-interval schedules using a dynamic choice procedure and to extend earlier work on concurrent variable-interval variable-ratio schedules. We analyzed performances at different time scales, finding strong similarities between concurrent variable-interval variable-interval and concurrent variable-interval variable- ratio performance within dynamic choice procedures. Time-based measures revealed almost identical performance in the two procedures compared with response-based measures, supporting the view that choice is best understood as time allocation. Performance at the smaller time scale of visits accorded with the tendency seen in earlier research toward developing a pattern of strong preference for and long visits to the richer alternative paired with brief "samples" at the leaner alternative ("fix and sample"). © 2017 Society for the Experimental Analysis of Behavior.

  1. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  2. Endorsement of the New Ecological Paradigm in Systematic and E-Mail Samples of College Students

    Science.gov (United States)

    Rideout, Bruce E.; Hushen, Katherine; McGinty, Dawn; Perkins, Stephanie; Tate, Jennifer

    2005-01-01

    As the initial phase of a longitudinal study of environmental perspective in college students, resident student opinion was sampled using the New Ecological Paradigm (NEP) scale administered through systematic alphabetical sampling. Sampling was also carried out by a blanket e-mail distribution of surveys for voluntary response. Results showed…

  3. The Impact of Mobile Phone Dependency on Health and Biomarkers in a Greek University Student Sample

    OpenAIRE

    Eugenia Minasidou; Athanasios Mastrokostas; Maria Gkrizioti; Faidra Eleftheriou; Thalia Bellali

    2015-01-01

    Introduction: Mobile phone use can be addictive for the young. However, little is known about the behavioral and biological effects of this addiction among the student population. Aim: The purpose of this study was to explore the effects of mobile phone use on the health behaviors and specific biomarkers in a sample of Greek students. Methods: Sample included 104 Nursing students from a stratified randomised sample. In 30 ran- domly selected out of the 104 students, melatonin and total antiox...

  4. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  5. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  6. Residency Applicants Prefer Online System for Scheduling Interviews

    Directory of Open Access Journals (Sweden)

    Wills, Charlotte

    2015-03-01

    Full Text Available Introduction: Residency coordinators may be overwhelmed when scheduling residency interviews. Applicants often have to coordinate interviews with multiple programs at once, and relying on verbal or email confirmation may delay the process. Our objective was to determine applicant mean time to schedule and satisfaction using online scheduling. Methods: This pilot study is a retrospective analysis performed on a sample of applicants offered interviews at an urban county emergency medicine residency. Applicants were asked their estimated time to schedule with the online system compared to their average time using other methods. In addition, they were asked on a five-point anchored scale to rate their satisfaction. Results: Of 171 applicants, 121 completed the survey (70.8%. Applicants were scheduling an average of 13.3 interviews. Applicants reported scheduling interviews using the online system in mean of 46.2 minutes (median 10, range 1-1800 from the interview offer as compared with a mean of 320.2 minutes (median 60, range 3-2880 for other programs not using this system. This difference was statistically significant. In addition, applicants were more likely to rate their satisfaction using the online system as “satisfied” (83.5% vs 16.5%. Applicants were also more likely to state that they preferred scheduling their interviews using the online system rather than the way other programs scheduled interviews (74.2% vs 4.1% and that the online system aided them coordinating travel arrangements (52.1% vs 4.1%. Conclusion: An online interview scheduling system is associated with higher satisfaction among applicants both in coordinating travel arrangements and in overall satisfaction. [West J Emerg Med. 2015;16(2:352-354.

  7. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  8. Subrandom methods for multidimensional nonuniform sampling.

    Science.gov (United States)

    Worley, Bradley

    2016-08-01

    Methods of nonuniform sampling that utilize pseudorandom number sequences to select points from a weighted Nyquist grid are commonplace in biomolecular NMR studies, due to the beneficial incoherence introduced by pseudorandom sampling. However, these methods require the specification of a non-arbitrary seed number in order to initialize a pseudorandom number generator. Because the performance of pseudorandom sampling schedules can substantially vary based on seed number, this can complicate the task of routine data collection. Approaches such as jittered sampling and stochastic gap sampling are effective at reducing random seed dependence of nonuniform sampling schedules, but still require the specification of a seed number. This work formalizes the use of subrandom number sequences in nonuniform sampling as a means of seed-independent sampling, and compares the performance of three subrandom methods to their pseudorandom counterparts using commonly applied schedule performance metrics. Reconstruction results using experimental datasets are also provided to validate claims made using these performance metrics. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. 'Neknomination': Predictors in a sample of UK university students.

    Science.gov (United States)

    Moss, Antony C; Spada, Marcantonio M; Harkin, Jamila; Albery, Ian P; Rycroft, Nicola; Nikčević, Ana V

    2015-06-01

    To identify prevalence and predictors of participation in the online drinking game 'neknomination' amongst university students. A convenience sample of 145 university students participated in a study about drinking behaviours, completing a questionnaire about their participation in neknomination, the Alcohol Use Disorders Identification Test, and the Resistance to Peer Influence Scale. Out of 145 students sampled, 54% took part in neknomination in the previous month. Mann-Whitney U tests revealed significantly higher scores on the Alcohol Use Disorders Identification Test, and significantly lower scores on the Resistance to Peer Influence Scale, for those who had participated in neknomination. A significant correlation was also shown between specific peer pressure to neknominate, and engagement in neknomination. A logistic regression analysis indicated that scores on the Alcohol Use Disorders Identification Test, but not the Resistance to Peer Influence Scale, predicted classification as an individual who participated in neknomination. We found that over half of respondents had participated in a neknomination game in the past month, with almost all male respondents having done so. Participation in neknomination was strongly associated with general hazardous drinking behaviour but not with resistance to peer influence. Further research is needed to understand the role of engagement with social media in drinking games and risky drinking.

  10. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  11. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  12. A Data Scheduling and Management Infrastructure for the TEAM Network

    Science.gov (United States)

    Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.; Unwin, R.

    2009-04-01

    currently partnering with the San Diego Super Computer Center to build the data management infrastructure. Data collected from the three core protocols as well as others are currently made available through the TEAM Network portal, which provides the content management framework, the data scheduling and management framework, an administrative framework to implement and manage TEAM sites, collaborative tools and a number of tools and applications utilizing Google Map and Google Earth products. A critical element of the TEAM Network data management infrastructure is to make the data publicly available in as close to real-time as possible (the TEAM Network Data Use Policy: http://www.teamnetwork.org/en/data/policy). This requires two essential tasks to be accomplished, 1) A data collection schedule has to be planned, proposed and approved for a given TEAM site. This is a challenging process since TEAM sites are geographically distributed across the tropics and hence have different seasons where they schedule field sampling for the different TEAM protocols. Capturing this information and ensuring that TEAM sites follow the outlined legal contract is key to the data collection process and 2) A stream-lined and efficient information management system to ensure data collected from the field meet the minimum data standards (i.e. are of the highest scientific quality) and are securely transferred, archived, processed and be rapidly made publicaly available, as a finished consumable product via the TEAM Network portal. The TEAM Network is achieving these goals by implementing an end-to-end framework consisting of the Sampling Scheduler application and the Data Management Framework. Sampling Scheduler The Sampling Scheduler is a project management, calendar based portal application that will allow scientists at a TEAM site to schedule field sampling for each of the TEAM protocols implemented at that site. The sampling scheduler addresses the specific requirements established in the

  13. Predicting Academic Success and Psychological Wellness in a Sample of Canadian Undergraduate Students

    Science.gov (United States)

    Chow, Henry P. H.

    2010-01-01

    Introduction: University students need to cope with a complex new life role and to achieve academic success. This article explores the academic performance and psychological well-being among university students in a western Canadian city. Method: Using a convenience sample, a total of 501 undergraduate students in Regina, Saskatchewan took part in…

  14. A Regression Analysis of South Carolina Algebra I End-of-Course Exam Scores by Schedule Type

    Science.gov (United States)

    Smith, Dawn M.

    2017-01-01

    The purpose of this study was to examine the relationship between scheduling and first-year-high-school students' exam scores on the South Carolina Algebra I End-of-Course (EOC) assessment. The study compared existing empirical data from two southeastern high schools from the same school district using 4 X 4 block schedules from 2011-2014 and…

  15. Do the Math: Course Redesign's Impact on Learning and Scheduling

    Science.gov (United States)

    Squires, John; Faulkner, Jerry; Hite, Carl

    2009-01-01

    The math department at Cleveland State Community College embarked upon course redesign in 2008. As a result of this project, student engagement, learning, and success rates have increased dramatically. By including both developmental and college level math courses in the redesign, the department has been able to implement innovative scheduling and…

  16. Comparing three scheduling methods using BIM models in the Last Planner System

    Directory of Open Access Journals (Sweden)

    Brioso Xavier

    2017-12-01

    Full Text Available This article presents strategies for teaching scheduling methods such as takt-time, flowlines, and point-to-point precedence relations (PTPPRs using build­ing information modeling (BIM models in the Last Planner System. This article is the extended version of the article entitled “Teaching Takt-Time, Flowline and Point-to-point Precedence Relations: A Peruvian Case Study,” which has been published in Procedia Engineering (Vol. 196, 2017, pages 666-673. A case study is conducted in final year students of civil engineering at the Pontifical Catholic University of Peru. The mock-up project is an educational building that has high repetitive processes in the struc­tural works phase. First, traditional tools such as Excel spreadsheets and 2D drawings were used to teach produc­tion system design with takt-time, flowlines, and PTPPR. Second, 3D and 4D models with Revit 2016 and Navis­works 2016 were used to integrate the previous schedules with a BIM model and to identify its strengths and weak­nesses. Finally, Vico Office was used for the automation of schedules and comparison of the methods in 4D and 5D. This article describes the lectures, workshops, and simu­lations employed, as well as the feedback from students and researchers. The success of the teaching strategy is reflected in the survey responses from students and the final perceptions of the construction management tools presented.

  17. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  18. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  19. Assertiveness levels of nursing students who experience verbal violence during practical training.

    Science.gov (United States)

    Unal, Sati; Hisar, Filiz; Görgülü, Ulkü

    2012-08-01

    The aim of the study was to investigate students' verbal violence experiences, the effect of assertiveness on being subjected to violence, the behaviour of students after the violence and the experience of psychological distress during practical training. The study sample consisted of 274 students attending a school of nursing. A questionnaire form and the Rathus Assertiveness Schedule (RAS) were used for data collection. Percentages, means and the independent samples t-test were used for the evaluation of data. During practical training, the students suffered verbal violence from teachers, department nurses and doctors. The students had higher mean scores of RAS for most types of violence committed by the teachers and being reprimanded by the nurses and 69.3% had not responded to the violence. Students with a high level of assertiveness are subjected to violence more frequently. Being subjected to verbal violence and feeling psychological distress during practical training are a major problem among nursing students. Students should be supported in terms of assertiveness and dealing with violence effectively.

  20. Environmental sample accounting at the Savannah River Plant

    International Nuclear Information System (INIS)

    Zeigler, C.C.; Wood, M.B.

    1978-01-01

    At the Savannah River Plant Environmental Monitoring Laboratories, a computer-based systematic accounting method was developed to ensure that all scheduled samples are collected, processed through the laboratory, and counted without delay. The system employs an IBM 360/195 computer with a magnetic tape master file, an online disk file, and cathode ray tube (CRT) terminals. Scheduling and accounting are accomplished using computer-generated schedules, bottle labels, and output/ input cards. A printed card is issued for the collecting, analyzing, and counting of each scheduled sample. The card also contains information for the personnel who are to perform the work, e.g., sample location, aliquot to be processed, and procedure to be used. Manual entries are made on the card when each step in the process is completed. Additional pertinent data such as the reason a sample is not collected, the need for a nonstandard aliquot, and field measurement results are keypunched and then read into the computer files as required. The computer files are audited daily and summaries showing samples not processed in pre-established normal schedules are provided. The progress of sample analyses is readily determined at any time using the CRT terminal. Historic data are maintained on magnetic tape, and workload summaries showing the number of samples and number of determinations per month are issued. (author)

  1. Master schedule for CY-1983 Hanford environmental surveillance routine sampling program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.; Dirkes, R.L.

    1982-12-01

    The current schedule of data collection for the routine Hanford environmental surveillance and ground-water monitoring programs at the Hanford Site is presented. The purpose of the programs is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. Radiological monitoring data are reported for air (particulate filter and gases/vapor), Columbia River water, sanitary water, onsite pond water, foodstuffs (whole milk, leafy vegetables, fruit, wheat/alfalfa, beef, poultry/eggs), wildlife, soil and vegetation, and direct radiation. Information is also given for on site radiation control audit surveys (roadway, railway, aerial, and waste disposal sites, and the Hanford ground-water monitoring program

  2. Proper and Paradigmatic Metonymy as a Lens for Characterizing Student Conceptions of Distributions and Sampling

    Science.gov (United States)

    Noll, Jennifer; Hancock, Stacey

    2015-01-01

    This research investigates what students' use of statistical language can tell us about their conceptions of distribution and sampling in relation to informal inference. Prior research documents students' challenges in understanding ideas of distribution and sampling as tools for making informal statistical inferences. We know that these…

  3. How Should School Districts Shape Teacher Salary Schedules? Linking School Performance to Pay Structure in Traditional Compensation Schemes

    Science.gov (United States)

    Grissom, Jason A.; Strunk, Katharine O.

    2012-01-01

    This study examines the relative distribution of salary schedule returns to experience for beginning and veteran teachers. We argue that districts are likely to benefit from structuring salary schedules with greater experience returns early in the teaching career. To test this hypothesis, we match salary data to school-level student performance…

  4. Implicit and Explicit Weight Bias in a National Sample of 4732 Medical Students: The Medical Student CHANGES Study

    OpenAIRE

    Phelan, Sean M.; Dovidio, John F.; Puhl, Rebecca M.; Burgess, Diana J.; Nelson, David B.; Yeazel, Mark W.; Hardeman, Rachel; Perry, Sylvia; van Ryn, Michelle

    2014-01-01

    Objective To examine the magnitude of explicit and implicit weight biases compared to biases against other groups; and identify student factors predicting bias in a large national sample of medical students. Design and Methods A web-based survey was completed by 4732 1st year medical students from 49 medical schools as part of a longitudinal study of medical education. The survey included a validated measure of implicit weight bias, the implicit association test, and 2 measures of explicit bi...

  5. Stability of DREEM in a Sample of Medical Students: A Prospective Study

    Directory of Open Access Journals (Sweden)

    Muhamad Saiful Bahri Yusoff

    2012-01-01

    Full Text Available Background. Over the last 15 year, DREEM was applied in various educational settings to appraise educational climate. So far, none of article reported its stability in Malaysian medical students. Objective. To determine stability of the DREEM to measure educational climate at different time and occasions using a sample of medical students. Methodology. A prospective cohort study was done on 196 first year medical students. It was administered to the medical students at four different intervals. The Cronbach's alpha and intraclass correlation analysis were applied to measure internal consistency and agreement level across the intervals. The analysis was done using SPSS 18. Result. A total of 186 (94.9% medical students responded completely to the DREEM inventory. The overall Cronbach's alpha value of the DREEM at the four measurements ranged between 0.91 and 0.94. The average Cronbach's alpha values of the five subscales ranged between 0.45 and 0.83. The ICC coefficient values for the DREEM total score was 0.67 and its subscales ranged between 0.51 and 0.62. Conclusion. This study supported satisfactory levels of stability and internal consistency of the DREEM to measure educational climate over multiple observations in a sample of Malaysian medical students. Continued research is required to optimise its psychometric credential across educational settings.

  6. Middle School A/B Block and Traditional Scheduling: An Analysis of Math and Reading Performance by Race

    Science.gov (United States)

    Gill, Willie Wallicia Allen

    2011-01-01

    The purpose of this quantitative study was to examine whether a difference existed in the percentage performance of students earning a pass/advanced score on the Standards of Learning (SOL) Test in math and reading in Virginia's Region IV for schools using an A/B block schedule and those using a traditional schedule. The research also examined if…

  7. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  8. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  9. Education of a model student.

    Science.gov (United States)

    Novikoff, Timothy P; Kleinberg, Jon M; Strogatz, Steven H

    2012-02-07

    A dilemma faced by teachers, and increasingly by designers of educational software, is the trade-off between teaching new material and reviewing what has already been taught. Complicating matters, review is useful only if it is neither too soon nor too late. Moreover, different students need to review at different rates. We present a mathematical model that captures these issues in idealized form. The student's needs are modeled as constraints on the schedule according to which educational material and review are spaced over time. Our results include algorithms to construct schedules that adhere to various spacing constraints, and bounds on the rate at which new material can be introduced under these schedules.

  10. Non-suicidal self-injuries in a sample of Mexican university students

    OpenAIRE

    Castro Silva, Everardo; Benjet, Corina; Juárez García, Francisco; Jurado Cárdenas, Samuel; Lucio Gómez-Maqueo, María Emilia; Valencia Cruz, Alejandra

    2017-01-01

    Abstract Introduction Non-suicidal self-injuries (NSSI) are a worldwide health problem that affects principally young people, and can impact negatively the mental and physical health of those that self-injure. Objective To examine the frequency of NSSI in 564 undergraduate students (132 male, 432 female) from Mexico City and the association of NSSI with depressive symptoms, anxiety, impulsivity, self-efficacy, and emotion regulation. Method A convenience sample of 564 undergraduate student...

  11. Using Variable Interval Reinforcement Schedules to Support Students in the Classroom: An Introduction with Illustrative Examples

    Science.gov (United States)

    Hulac, David; Benson, Nicholas; Nesmith, Matthew C.; Wollersheim Shervey, Sarah

    2016-01-01

    When behaviors are reinforced with a variable interval reinforcement schedule, reinforcement is available only after an unknown period of time. These types of reinforcement schedules are most useful for reinforcing slow and steady responding and for differentially reinforcing behaviors that are incompatible with some problematic behaviors. This…

  12. Predicting Scheduling and Attending for an Oral Cancer Examination

    Science.gov (United States)

    Shepperd, James A.; Emanuel, Amber S.; Howell, Jennifer L.; Logan, Henrietta L.

    2015-01-01

    Background Oral and pharyngeal cancer is highly treatable if diagnosed early, yet late diagnosis is commonplace apparently because of delays in undergoing an oral cancer examination. Purpose We explored predictors of scheduling and attending an oral cancer examination among a sample of Black and White men who were at high risk for oral cancer because they smoked. Methods During an in-person interview, participants (N = 315) from rural Florida learned about oral and pharyngeal cancer, completed survey measures, and were offered a free examination in the next week. Later, participants received a follow-up phone call to explore why they did or did not attend their examination. Results Consistent with the notion that scheduling and attending an oral cancer exam represent distinct decisions, we found that the two outcomes had different predictors. Defensive avoidance and exam efficacy predicted scheduling an examination; exam efficacy and having coping resources, time, and transportation predicted attending the examination. Open-ended responses revealed that the dominant reasons participants offered for missing a scheduled examination was conflicting obligations, forgetting, and confusion or misunderstanding about the examination. Conclusions The results suggest interventions to increase scheduling and attending an oral cancer examination. PMID:26152644

  13. Military Free Fall Scheduling And Manifest Optimization Model

    Science.gov (United States)

    2016-12-01

    zone. As interest in qualifying more personnel increased, the course expanded. By the mid-1990s, Reyes explains, a new location was required to better...Since 2005, the Chilean Professional Soccer Association has used operations research techniques to schedule professional leagues in Chile . These...a new parachute the students are using, the RA-1. The RA-1 parachute has a longer glide ratio, which means the rate of descent is slower than with

  14. The belief systems of protesting college students.

    Science.gov (United States)

    Blumenthal, M D

    1973-06-01

    A group of 29 college students who had been arrested or nominated as having participated in a street disturbance aimed at producing social change were interviewed. The interview schedule was highly similar to one which had been used to investigate attitudes toward violence in a random, representative sample of American men. The data collected from the arrestees are compared with data from college students in the national sample. This study shows that the arrestees are more likely to think that violence is necessary to produce social change than are college students generally, and are more likely to believe that existing social institutions are inadequate. As a group, the arrestees are more identified with white student demonstrators and black protestors than are college students generally. The arrestees are also likely to regard the police as untrusworthy, looking for trouble, and apt to dislike people like themselves. In addition to the negative attitudes toward the police held by the student arrestees, they are more likely to regard police actions as violence (and hence provocative) than are other college students. The arrestees are far more likely than other college students to cleave to humanistic values. However, most of the differences between the arrestees and other American college students could be predicted from a general model of the justification of violence, so that it appears that the student activists' beliefs differ not so much in kind from those of other Americans as they do in degree.

  15. Drinking game participation and outcomes in a sample of Australian university students.

    Science.gov (United States)

    George, Amanda M; Zamboanga, Byron L

    2018-05-15

    Most drinking game (DG) research among university students has been conducted among USA college samples. The extent to which demographics and game type (e.g. team and sculling games) are linked to DG behaviours/consequences among non-USA students is not well understood. As such, the current study investigated characteristics of DG participation (and associated outcomes) among a sample of Australian university students. University students (N = 252; aged 18-24 years; 67% female) who had consumed alcohol in the prior year completed an online survey. Measures included demographics, DG behaviours (lifetime, frequency and consumption) and gaming-specific consequences. Most of the students reported lifetime DG participation (85%). Among those who played a DG in the prior 6 months (69%), most had experienced a negative gaming-specific consequence. While team games were the most popular DG played, regression analysis demonstrated that participation in games which encouraged consumption (e.g. sculling) were associated with increased alcohol consumption during play. In addition to being older, playing DGs more frequently, and consuming more alcohol while playing, participation in both consumption and dice games (e.g. 7-11, doubles) predicted more negative gaming-specific consequences. DG participation is common among Australian university students, as it is in other parts of the world. The importance of game type is clear, particularly the risk of consumption games. Findings could help inform interventions to reduce participation in consumption games and identify students who might be especially at-risk for experiencing negative DG consequences. © 2018 Australasian Professional Society on Alcohol and other Drugs.

  16. A Comparison of Mental Health and Alcohol Use Between Traditional and Nontraditional Students.

    Science.gov (United States)

    Trenz, Rebecca C; Ecklund-Flores, Lisa; Rapoza, Kimberly

    2015-01-01

    To describe differences in life stress, anxiety, depression, and alcohol use between traditional and nontraditional college students. A targeted, stratified sample of college students (N = 1,187; Mage = 23.96, SD = 7.30; female, 67.2%) completed study surveys in Spring 2011. Participants completed demographic information, life stress (Crisis in Family Systems), anxiety (Beck Anxiety Inventory), depression (Center for Epidemiologic Studies Depression Scale), and alcohol use (Alcohol Use Disorders Identification Test-Consumption) surveys during regularly scheduled class times. Fifty-three percent (n = 630) of study participants were nontraditional students. Nontraditional students scored significantly higher than traditional students on life stress (t[1182] = -3.05, p students did not differ on alcohol use. Interventions for nontraditional college students should address the mental health issues specific to this growing college subpopulation.

  17. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  18. Homework schedule: an important factor associated with shorter sleep duration among Chinese school-aged children.

    Science.gov (United States)

    Li, Shenghui; Yang, Qian; Chen, Zhe; Jin, Xingming; Jiang, Fan; Shen, Xiaoming

    2014-09-03

    This study was designed to examine the hypothesis that homework schedule has adverse impacts on Chinese children's sleep-wake habits and sleep duration. A random sample of 19,299 children aged 5.08 to 11.99 years old participated in a large, cross-sectional survey. A parent-administered questionnaire was completed to quantify children's homework schedule and sleep behaviors. Generally, it was demonstrated that more homework schedule was significantly associated with later bedtime, later wake time, and shorter sleep duration. Among all sleep variables, bedtime and sleep duration during weekdays appeared to be most affected by homework schedule, especially homework schedule during weekdays.

  19. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  20. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  1. A Graduate Student's Experience and Perspective on a Student-Teacher-Researcher Partnership

    Science.gov (United States)

    Bostic, J.; Stylinski, C.; Doty, C.

    2017-12-01

    Teachers and their K-12 students lack firsthand experience in science research and often harbor misconceptions about science practices and the nature of science. To address this challenge, the NOAA-funded Student-Teacher-Researcher (STAR) partnership that provides rural high school students with authentic research experiences investigating the amount and sources of nitrate in schoolyard runoff. Teachers received training, guiding curricular materials aligned with NGSS and in-classroom support. With a focus on evidence-based reasoning skills, students actively participate in the research process through sample collection, data analysis, and an in-person discussion of conclusions and implications with our scientist team. As a member of this team, I assisted with refining the study design, analyzing nitrate isotope runoff samples, and sharing insights and feedback with students during the in-person discussion session. Assessment results indicate student gained an understanding of nitrate pollution and of science practices. As a graduate student, young scientist, and possessor of a B.S. in Science Education, I already recognized the value of involving K-12 students and teachers in authentic research experiences, as these experiences expose students to the nature of science while also improving content knowledge. During the STAR partnership, I learned firsthand some of the obstacles presented during outreach involving partnerships between a research institution and schools, such as inflexibility of school scheduling and the need for flexibility with research questions requiring complex lab analysis. Additionally, I discovered the challenge of working systemically across a school district, which can have broad impact but limit student experiences. Highlights of my experience included interactions with students and teachers, especially when students have unexpected answers to my questions, providing novel explanations for patterns observed in the data. Despite the

  2. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  3. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  4. UMTRA Project water sampling and analysis plan, Belfield and Bowman, North Dakota

    International Nuclear Information System (INIS)

    1994-08-01

    Surface remedial action is scheduled to begin at the Belfield and Bowman Uranium Mill Tailings Remedial Action (UMTRA) Project sites in the spring of 1996. Water sampling was conducted in 1993 at both the Belfield processing site and the Bowman processing/disposal site. Results of the sampling at both sites indicate that ground water conditions have remained relatively stable over time. Water sampling activities are not scheduled for 1994 because ground water conditions at the two sites are relatively stable, the 1993 sampling was comprehensive, and surface remediation activities are not scheduled to start until 1996. The next water sampling event is scheduled before the start of remedial activities and will include sampling selected monitor wells at both sites and several domestic wells in the vicinity

  5. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  6. Flow shop scheduling algorithm to optimize warehouse activities

    Directory of Open Access Journals (Sweden)

    P. Centobelli

    2016-01-01

    Full Text Available Successful flow-shop scheduling outlines a more rapid and efficient process of order fulfilment in warehouse activities. Indeed the way and the speed of order processing and, in particular, the operations concerning materials handling between the upper stocking area and a lower forward picking one must be optimized. The two activities, drops and pickings, have considerable impact on important performance parameters for Supply Chain wholesaler companies. In this paper, a new flow shop scheduling algorithm is formulated in order to process a greater number of orders by replacing the FIFO logic for the drops activities of a wholesaler company on a daily basis. The System Dynamics modelling and simulation have been used to simulate the actual scenario and the output solutions. Finally, a t-Student test validates the modelled algorithm, granting that it can be used for all wholesalers based on drop and picking activities.

  7. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Science.gov (United States)

    Xia, Feng; Ma, Longhua; Peng, Chen; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS) scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting cross-layer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An event-driven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN. PMID:27879934

  8. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Directory of Open Access Journals (Sweden)

    Jinxiang Dong

    2008-07-01

    Full Text Available There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting crosslayer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An eventdriven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN.

  9. Development and use of schedules in education of elementary school children with ASD

    Directory of Open Access Journals (Sweden)

    Sharova Y.A.

    2015-09-01

    Full Text Available The work on preparedness for education of elementary school students with autism disorders can be greatly facilitated by the use of the methods that allow to structure child's knowledge about necessary changes. The use of schedules greatly facilitates the process of education, guiding and work on children's adaptation. The article describes stages of the work on inclusion and use of general and individual schedules in two groups of children with intellectual disabilities and autism spectrum disorders in preschool classes. This work was conducted in the Center for Psychological, Medical and Social Support to Children and Adolescents of the Moscow State University of Psychology and Education. The article contains examples of the use schedules to increase independence and to reduce anxiety in children with autism spectrum disorders.

  10. Content Analysis Schedule for Bilingual Education Programs: BICEP Intercambio de la Cultura.

    Science.gov (United States)

    Shore, Marietta Saravia; Nafus, Charles

    This content analysis schedule for BICEP Intercambio de la Cultura (San Bernardino, California), presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  11. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  12. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  13. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  14. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  15. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  16. The Impact of Mobile Phone Dependency on Health and Biomarkers in a Greek University Student Sample

    Directory of Open Access Journals (Sweden)

    Eugenia Minasidou

    2015-12-01

    Full Text Available Introduction: Mobile phone use can be addictive for the young. However, little is known about the behavioral and biological effects of this addiction among the student population. Aim: The purpose of this study was to explore the effects of mobile phone use on the health behaviors and specific biomarkers in a sample of Greek students. Methods: Sample included 104 Nursing students from a stratified randomised sample. In 30 ran- domly selected out of the 104 students, melatonin and total antioxidant levels in saliva were also measured. Mobile phone dependence was estimated with the Mobile Phone Dependence Question- naire by Toda et al and general health with the GHQ-28. We used the Antioxidant assay kit-SIGMA to measure the total antioxidant levels and the anosoenzymic method ELISA (IBL kit to measure melatonine levels. Analysis was performed with SPSS v15.0 software. All hypothesis were tested at a p<0,05 level. Results: No statistical difference between genders was detected (p=0.182. High dependence was apparent in 13.5% of the sample, which correlated with worse general health (p=0.004, greater alcohol consumption (p=0.007, sleep disturbances (p=0.02 and worse nutritional habits (p=0.032. Moreover, high mobile dependent students exhibited higher concentration of early morning mel- atonin (p=0.07 and lower antioxidant concentration (p=0.333 in saliva, compared to low mobile dependent students. Conclusions: Excessive use of mobiles among students seems to correlate with unhealthy habits and impaired health. The effect in well known biomarkers may suggest the burden of the health of the student population. However, the long term effects on health require further investigation.

  17. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  18. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  19. Problematic Internet use in a sample of Colombian university students

    Directory of Open Access Journals (Sweden)

    Diana Ximena Puerta-Cortés

    2013-06-01

    Full Text Available Internet is a tool that facilitates the development of academic and social activities, business and entertainment. However, particular bevavior may arise in relation with its overuse. This research aims to identify sociodemographic characteristics and type of Internet use in a sample of Colombian university students and relate it to the possible use problematic. The sample consisted of 595 students from the University of Ibagué of 16-34 years of age who completed all three sections of the questionnaire: (1 socio-demographic data, (2 Internet usage information and (3 an adapted version of the Internet Addiction Test - IAT- (Young, 1998a. The results showed two groups, one with controlled use of the internet (88% and one with problematic use (12 %, only one case showed addictive use. Problematic Internet use was related to the number of hours  pent on social networks, chat, sites with adult content and movies. The use of these Internet applications generated interference in daily activities.

  20. Chronotype, Light Exposure, Sleep, and Daytime Functioning in High School Students Attending Morning or Afternoon School Shifts: An Actigraphic Study.

    Science.gov (United States)

    Martin, Jeanne Sophie; Gaudreault, Michael M; Perron, Michel; Laberge, Luc

    2016-04-01

    Adolescent maturation is associated with delays of the endogenous circadian phase. Consequently, early school schedules may lead to a mismatch between internal and external time, which can be detrimental to adolescent sleep and health. In parallel, chronotype is known to play a role in adolescent health; evening chronotype adolescents are at higher risk for sleep problems and lower academic achievement. In the summer of 2008, Kénogami High School (Saguenay, Canada) was destroyed by fire. Kénogami students were subsequently relocated to Arvida High School (situated 5.3 km away) for the 2008-2009 academic year. A dual school schedule was implemented, with Arvida students attending a morning schedule (0740-1305 h) and Kénogami students an afternoon schedule (1325-1845 h). This study aimed to investigate the effects of such school schedules and chronotype on sleep, light exposure, and daytime functioning. Twenty-four morning and 33 afternoon schedule students wore an actigraph during 7 days to measure sleep and light exposure. Academic achievement was obtained from school. Subjects completed validated questionnaires on daytime sleepiness, psychological distress, social rhythms, school satisfaction, alcohol, and chronotype. Overall, afternoon schedule students had longer sleep duration, lower sleepiness, and lower light exposure than morning schedule students. Evening chronotypes (E-types) reported higher levels of sleepiness than morning chronotypes (M-types) in both morning and afternoon schedules. Furthermore, M-types attending the morning schedule reported higher sleepiness than M-types attending the afternoon schedule. No difference was found between morning and afternoon schedule students with regard to academic achievement, psychological distress, social rhythms, school satisfaction, and alcohol consumption. However, in both schedules, M-type had more regular social rhythms and lower alcohol consumption. In summary, this study emphasizes that an early school

  1. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  2. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  3. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  4. Nonstandard Work Schedules, Family Dynamics, and Mother-Child Interactions During Early Childhood.

    Science.gov (United States)

    Prickett, Kate C

    2018-03-01

    The rising number of parents who work nonstandard schedules has led to a growing body of research concerned with what this trend means for children. The negative outcomes for children of parents who work nonstandard schedules are thought to arise from the disruptions these schedules place on family life, and thus, the types of parenting that support their children's development, particularly when children are young. Using a nationally representative sample of two-parent families (Early Childhood Longitudinal Study-Birth cohort, n = 3,650), this study examined whether mothers' and their partners' nonstandard work schedules were associated with mothers' parenting when children were 2 and 4 years old. Structural equation models revealed that mothers' and their partners' nonstandard work schedules were associated with mothers' lower scores on measures of positive and involved parenting. These associations were mediated by fathers' lower levels of participation in cognitively supportive parenting and greater imbalance in cognitively supportive tasks conducted by mothers versus fathers.

  5. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  6. Individual differences in strategic flight management and scheduling

    Science.gov (United States)

    Wickens, Christopher D.; Raby, Mireille

    1991-01-01

    A group of 30 instrument-rated pilots was made to fly simulator approaches to three airports under conditions of low, medium, and high workload conditions. An analysis is presently conducted of the difference in discrete task scheduling between the group of 10 highest and 10 lowest performing pilots in the sample; this categorization was based on the mean of various flight-profile measures. The two groups were found to differ from each other only in terms of the time when specific events were conducted, and of the optimality of scheduling for certain high-priority tasks. These results are assessed in view of the relative independence of task-management skills from aircraft-control skills.

  7. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  8. Environmental sampling accounting at the Savannah River Plant

    International Nuclear Information System (INIS)

    Zeigler, C.C.; Wood, M.B.

    1978-06-01

    At the Savannah River Plant Environmental Monitoring Laboratories, a computer-based systematic accounting method was developed to ensure that all scheduled samples are collected, processed through the laboratory, and counted without delay. The system employs an IBM 360/195 computer with a magnetic tape master file, an on-line disk file, and cathode ray tube (CRT) terminals. Scheduling and accounting are accomplished by using computer-generated schedules, collection labels, and output/input cards. For each scheduled sample and analysis, a printed card is issued for collection, laboratory analysis, and counting. The cards also contain information needed by personnel performing the jobs, such as sample location, aliquot to be processed, or procedure number. Manual entries are made on the cards when each step in the process is completed. Additional pertinent data are also manually entered on the cards; e.g., entries are made explaining why a sample is not collected, the sample aliquot in the event a nonstandard aliquot is processed, field measurement results, and analytical results. These manually entered data are keypunched and read into the computer files. The computer files are audited daily, and summaries of samples not processed in pre-established normal time intervals are issued. The progress of sample analyses can also be readily determined at any time using the CRT terminal. Historic data are also maintained on magnetic tape and workload summaries are issued showing the number of samples and number of determinations per month

  9. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  10. Statistical Sampling Handbook for Student Aid Programs: A Reference for Non-Statisticians. Winter 1984.

    Science.gov (United States)

    Office of Student Financial Assistance (ED), Washington, DC.

    A manual on sampling is presented to assist audit and program reviewers, project officers, managers, and program specialists of the U.S. Office of Student Financial Assistance (OSFA). For each of the following types of samples, definitions and examples are provided, along with information on advantages and disadvantages: simple random sampling,…

  11. Assessing the Alcohol-BMI Relationship in a US National Sample of College Students

    Science.gov (United States)

    Barry, Adam E.; Piazza-Gardner, Anna K.; Holton, M. Kim

    2015-01-01

    Objective: This study sought to assess the body mass index (BMI)-alcohol relationship among a US national sample of college students. Design: Secondary data analysis using the Fall 2011 National College Health Assessment (NCHA). Setting: A total of 44 US higher education institutions. Methods: Participants included a national sample of college…

  12. Non-standard work schedules, gender, and parental stress

    Directory of Open Access Journals (Sweden)

    Mariona Lozano

    2016-02-01

    Full Text Available Background: Working non-standard hours changes the temporal structure of family life, constraining the time that family members spend with one another and threatening individuals' well-being. However, the empirical research on the link between stress and non-standard schedules has provided mixed results. Some studies have indicated that working non-standard hours is harmful whereas others have suggested that working atypical hours might facilitate the balance between family and work. Moreover, there is some evidence that the association between stress and non-standard employment has different implications for men and women. Objective: This paper examines the association between non-standard work schedules and stress among dual-earner couples with children. Two research questions are addressed. First, do predictability of the schedule and time flexibility moderate the link between non-standard work hours and stress? Second, do non-standard schedules affect men's and women's perceptions of stress differently? Methods: We use a sample of 1,932 working parents from the Canadian 2010 General Social Survey, which includes a time-use diary. A sequential logit regression analysis stratified by gender is employed to model two types of result. First, we estimate the odds of being stressed versus not being stressed. Second, for all respondents feeling stressed, we estimate the odds of experiencing high levels versus moderate levels of stress. Results: Our analysis shows that the link between non-standard working hours and perceived stress differs between mothers and fathers. First, fathers with non-standard schedules appear more likely to experience stress than those working standard hours, although the results are not significant. Among mothers, having a non-standard schedule is associated with a significantly lower risk of experiencing stress. Second, the analysis focusing on the mediating role of flexibility and predictability indicates that

  13. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  14. Predictors of Stress in College Students.

    Science.gov (United States)

    Saleh, Dalia; Camart, Nathalie; Romo, Lucia

    2017-01-01

    University students often face different stressful situations and preoccupations: the first contact with the university, the freedom of schedule organization, the selection of their master's degree, very selective fields, etc. The purpose of this study is to evaluate a model of vulnerability to stress in French college students. Stress factors were evaluated by a battery of six scales that was accessible online during 3 months. A total of 483 students, aged between 18 and 24 years (Mean = 20.23, standard deviation = 1.99), was included in the study. The results showed that 72.9, 86.3, and 79.3% of them were suffering from psychological distress, anxiety and depressive symptoms, respectively. More than half the sample was also suffering from low self-esteem (57.6%), little optimism (56.7%), and a low sense of self-efficacy (62.7%). Regression analyses revealed that life satisfaction, self-esteem, optimism, self-efficacy and psychological distress were the most important predictors of stress. These findings allow us to better understand stress-vulnerability factors in students and drive us to substantially consider them in prevention programs.

  15. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  16. Microstructural evolution in dual-ion irradiated 316SS under various helium injection schedules

    International Nuclear Information System (INIS)

    Kohyama, A.; Igata, N.; Ayrault, G.; Tokyo Univ.

    1984-01-01

    Dual-ion irradiated 316 SS samples with various helium injection schedules were studied. The intent of using different schedules was to either approximate the MFR condition, mimic the mixed spectrum reactor condition or mimic the fast reactor condition. The objective of this investigation is to study the influence of these different helium injection schedules on the microstructural development under irradiation. The materials for this study was 316 SS (MFE heat) with three thermomechanical pre-irradiation treatments: solution annealed, solution annealed and aged and 20% cold worked. The cavity nucleation and growth stages were investigated using high resolution TEM. (orig.)

  17. Personality, lifestyles, alcohol and drug consumption in a sample of British medical students.

    Science.gov (United States)

    Ashton, C H; Kamali, F

    1995-05-01

    Personality characteristics and lifestyle variables were assessed in two cohorts of second-year medical students at the University of Newcastle upon Tyne, UK as part of a psychopharmacology 'teach-in' in 1993 and 1994. The pooled sample included 186 students: 77 men, 109 women, mean age 20.4 +/- 1.8 years. Measures included the Eysenck Personality Questionnaire, the Hospital Anxiety Depression Scale, and a questionnaire concerning consumption of alcohol, tobacco, cannabis and other illicit drugs, and physical exercise. The results were compared, where possible, with a similar survey in Newcastle upon Tyne medical students in 1983 and 1984. Personality variables, prevalence of cigarette smoking, levels of caffeine consumption and participation in sports had not changed significantly over the decade. There appeared to be a modest overall increase in alcohol consumption and in the 1993 and 1994 cohorts of students, 25.5% of those who drank alcohol exceeded recommended low risk levels (comparable data not available for 1983 and 1984). Reported use of cannabis and other illicit drugs had more than doubled, and in the present survey 49.2% of students recorded using cannabis and 22% had tried other illicit drugs. Corresponding figures for 1983 and 1984 were 20.9% for cannabis and 3.3% for other illicit drugs. Anxiety levels were not measured in 1983 and 1984 but in the present survey 39.3% of the students had anxiety ratings within the clinically significant range. The high levels of alcohol consumption and illicit drug use, and the high anxiety ratings, in this sample of medical students are a cause for concern.(ABSTRACT TRUNCATED AT 250 WORDS)

  18. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  19. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  20. A Study on Primary and Secondary School Students' Misconceptions about Greenhouse Effect (Erzurum Sampling)

    Science.gov (United States)

    Gul, Seyda; Yesilyurt, Selami

    2011-01-01

    The aim of this study is to determine what level of primary and secondary school students' misconceptions related to greenhouse effect is. Study group consists of totally 280 students attended to totally 8 primary and secondary schools (4 primary school, 4 secondary school) which were determined with convenient sampling method from center of…

  1. Feasibility of computerized scheduled gradual reduction for adolescent smoking cessation.

    Science.gov (United States)

    Riley, William; Jerome, Albert; Behar, Albert; Zack, Sharon

    2002-01-01

    The purpose of this project was to modify a smoking cessation program that uses computerized scheduled gradual reduction for use with adolescent smokers and to test the feasibility of this cessation approach in group support and minimal contact modalities. Utilizing a lesson plan approach with high school marketing students in five high schools and student survey feedback, the LifeSign program was modified to be an acceptable smoking cessation program for adolescent smokers. In the first study, 17 adolescent smokers used the modified program with seven associated weekly group support sessions. At the end of treatment, 29% had quit smoking, and over half of those who continued to smoke reduced their smoking rate by 50%. In the second study, the LifeSign for Teens program was evaluated with 18 adolescent smokers in a minimal contact format. At the end of treatment, 17% had quit smoking, and mean smoking rate reductions of 43% were found among those who continued smoking. At 1-year follow-up, all subjects who had quit at posttreatment reported continuous abstinence. The results of these two small trials suggest that a computerized scheduled gradual reduction approach may be an accepted and potentially efficacious approach for smoking cessation among adolescent smokers.

  2. Treating Non-Retentive Encopresis with Rewarded Scheduled Toilet Visits

    Science.gov (United States)

    Boles, Richard E; Roberts, Michael C; Vernberg, Eric M

    2008-01-01

    We evaluated the effects of rewarded scheduled toilet sits on non-retentive encopretic behavior of an elementary-school student receiving services for serious emotional disturbance. A multidisciplinary team implemented the 8-week intervention using a multiple baseline across settings design. The results showed an increase in sitting on the toilet and a decline in encopretic episodes in both school and home settings. These findings support the use of a behavioral intervention for children with significant behavioral disorders within a classroom setting. PMID:22477690

  3. A Scheduling Algorithm for the Distributed Student Registration System in Transaction-Intensive Environment

    Science.gov (United States)

    Li, Wenhao

    2011-01-01

    Distributed workflow technology has been widely used in modern education and e-business systems. Distributed web applications have shown cross-domain and cooperative characteristics to meet the need of current distributed workflow applications. In this paper, the author proposes a dynamic and adaptive scheduling algorithm PCSA (Pre-Calculated…

  4. The Added Value of the Combined Use of the Autism Diagnostic Interview-Revised and the Autism Diagnostic Observation Schedule: Diagnostic Validity in a Clinical Swedish Sample of Toddlers and Young Preschoolers

    Science.gov (United States)

    Zander, Eric; Sturm, Harald; Bölte, Sven

    2015-01-01

    The diagnostic validity of the new research algorithms of the Autism Diagnostic Interview-Revised and the revised algorithms of the Autism Diagnostic Observation Schedule was examined in a clinical sample of children aged 18-47 months. Validity was determined for each instrument separately and their combination against a clinical consensus…

  5. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  6. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  7. Schedules of Controlled Substances: Temporary Placement of ortho-Fluorofentanyl, Tetrahydrofuranyl Fentanyl, and Methoxyacetyl Fentanyl Into Schedule I. Temporary amendment; temporary scheduling order.

    Science.gov (United States)

    2017-10-26

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioids, N-(2-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)propionamide (ortho-fluorofentanyl or 2-fluorofentanyl), N-(1-phenethylpiperidin-4-yl)-N-phenyltetrahydrofuran-2-carboxamide (tetrahydrofuranyl fentanyl), and 2-methoxy-N-(1-phenethylpiperidin-4-yl)-N-phenylacetamide (methoxyacetyl fentanyl), into Schedule I. This action is based on a finding by the Administrator that the placement of ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl into Schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to Schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl.

  8. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  9. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  10. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  11. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  12. The prevalence and correlates of depression, anxiety, and stress in a sample of college students.

    Science.gov (United States)

    Beiter, R; Nash, R; McCrady, M; Rhoades, D; Linscomb, M; Clarahan, M; Sammut, S

    2015-03-01

    Over the past four years, the Franciscan University Counseling Center has reported a 231% increase in yearly visits, as well as a 173% increase in total yearly clients. This trend has been observed at many universities as mental health issues pose significant problems for many college students. The objective of this study was to investigate potential correlates of depression, anxiety, and stress in a sample of college students. The final analyzed sample consisted of 374 undergraduate students between the ages of 18 and 24 attending Franciscan University, Steubenville, Ohio. Subjects completed a survey consisting of demographic questions, a section instructing participants to rate the level of concern associated with challenges pertinent to daily life (e.g. academics, family, sleep), and the 21 question version of the Depression Anxiety Stress Scale (DASS21). The results indicated that the top three concerns were academic performance, pressure to succeed, and post-graduation plans. Demographically, the most stressed, anxious, and depressed students were transfers, upperclassmen, and those living off-campus. With the propensity for mental health issues to hinder the success of college students, it is vital that colleges continually evaluate the mental health of their students and tailor treatment programs to specifically target their needs. Copyright © 2014 Elsevier B.V. All rights reserved.

  13. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  14. [The effect of aluminum adjuvant and immunization schedule on immunogenicity of Sabin inactivated poliovirus vaccine].

    Science.gov (United States)

    Wang, Fang; Zhang, Ming; Xie, Bing-Feng; Cao, Han; Tong, Shao-Yong; Wang, Jun-Rong; Yu, Xiao-Ping; Tang, Yang; Yang, Jing-Ran; Sun, Ming-Bo

    2013-04-01

    To study the effect of aluminume adjuvant and immunization schedule on immunogenicity of Sabin inactivated poliovirus vaccine. Four batches of Sabin IPV were produced by different concentrations of type 1, 2, and 3 poliovirus and administrated on three-dose schedule at 0, 1, 2 months and 0, 2, 4 months on rats. Serum samples were collected one month after each dose and neutralizing antibody titers against three types poliovirus were determined by micro-neutralization assay. The GMTs of neutralizing antibodies against three types poliovirus increased significantly and the seropositivity rates were 100% in all groups after 3 doses. There was no significant difference between two immunization schedules, and the 0, 2, 4 month schedule could induce higher level neutralizing antibody compared to the 0, 1, 2 month schedule. The groups with aluminum adjuvant could induce higher level neutralizing antibody compared to the groups without adjuvant. Aluminum djuvant and immunization schedule could improve the immunogenicity of Sabin IPV.

  15. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  16. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  17. ELABORATION OF A DRYING SCHEDULE FOR Eucalyptus spp HYBRIDS CLONES WOODS

    Directory of Open Access Journals (Sweden)

    Celso Gonçalves Barbosa

    2005-03-01

    Full Text Available The elaboration of adequate drying schedules is essential to produce high quality conventional kiln dried lumber.Eucalyptus woods are particularly difficult to dry, and, for this reason, it is desirable that the drying schedule be carefullydeveloped. The objectives of this work were to elaborate a drying schedule for woods of ten Eucalyptus hybrids clones and toverify the propensity of these woods to post drying defects. For this purpose, it was applied the methodology of drastic drying at100°C, which associates intensity of defects, time and rate of drying, presented by small wood samples, with the behaviourto be presented by lumber after the conventional drying. The results allowed developing a drying schedule common to the tenclone lumbers. This program is based on an initial temperature of 40°C, final temperature of 66°C and drying potential equal to2.2. The drying time can be reduced, if the clones were grouped in accordance to their drying rate. The clones presented lowpropensity to split and high propensity to collapse.

  18. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  19. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  20. A confirmatory factor analysis of the Utrecht Work Engagement Scale for Students in a Chinese sample.

    Science.gov (United States)

    Meng, Lina; Jin, Yi

    2017-02-01

    Educational institutions play an important role in encouraging students' engagement with course work. Educators are finding instruments to measure students' engagement in order to develop strategies to improve it. Little is known about the factor structure of the Utrecht Work Engagement Scale for Students among Chinese nursing students. The aim of this research was to examine the factor structure of the Utrecht Work Engagement Scale for Students via confirmatory factor analysis. The study used a cross-sectional design. A sample of 480 students from a nursing school in one Chinese university completed the Utrecht Work Engagement Scale for Students. Factor analysis was used to analyze the resulting data. The overall results of internal consistency reliability and confirmatory factor analysis provided evidence supporting the reliability and three-factor structure of the Utrecht Work Engagement Scale for Students. The total internal consistency reliability coefficients were 0.91. Model comparison tests indicated that an oblique factors model that permitted correlations between pairs of error terms fitted the data better than other first-order models. In addition, due to the three strongly intercorrelated factors, a second-order model was found to fit the data well, providing support for the factorial structure of the Utrecht Work Engagement Scale for Students. The findings of confirmatory factor analysis provided evidence supporting the reliability and three-factor structure of the Utrecht Work Engagement Scale for Students when evaluated with a Chinese nursing student sample in this study. Thus, it is appropriate to use The Utrecht Work Engagement Scale for Students in for assessing the engagement among Chinese nursing students. Copyright © 2016 Elsevier Ltd. All rights reserved.

  1. Practicing field hockey skills along the contextual interference continuum: a comparison of five practice schedules.

    Science.gov (United States)

    Cheong, Jadeera Phaik Geok; Lay, Brendan; Grove, J Robert; Medic, Nikola; Razman, Rizal

    2012-01-01

    To overcome the weakness of the contextual interference (CI) effect within applied settings, Brady, 2008 recommended that the amount of interference be manipulated. This study investigated the effect of five practice schedules on the learning of three field hockey skills. Fifty-five pre-university students performed a total of 90 trials for each skill under blocked, mixed or random practice orders. Results showed a significant time effect with all five practice conditions leading to improvements in acquisition and learning of the skills. No significant differences were found between the groups. The findings of the present study did not support the CI effect and suggest that either blocked, mixed, or random practice schedules can be used effectively when structuring practice for beginners. Key pointsThe contextual interference effect did not surface when using sport skills.There appears to be no difference between blocked and random practice schedules in the learning of field hockey skills.Low (blocked), moderate (mixed) or high (random) interference practice schedules can be used effectively when conducting a multiple skill practice session for beginners.

  2. Reasons for Synthetic THC Use among College Students

    Science.gov (United States)

    Vidourek, Rebecca A.; King, Keith A.; Burbage, Michelle L.

    2013-01-01

    Synthetic THC, also known as fake marijuana, is used by college students in the United States. The present study examined reasons for recent synthetic THC use among college students (N = 339). Students completed a 3-page survey during regularly scheduled class times. Results indicated students reported using synthetic THC for curiosity, to get…

  3. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  4. Internet Addiction Among Elementary and Middle School Students in China: A Nationally Representative Sample Study

    Science.gov (United States)

    Li, Yajun; Zhang, Xinghui; Lu, Furong; Zhang, Qin

    2014-01-01

    Abstract The purpose of this study was to examine the prevalence of Internet addiction in a nationally representative sample of Chinese elementary and middle school students and to investigate Internet addiction among Internet users with different usages. The data were from the National Children's Study of China (NCSC) in which 24,013 fourth- to ninth-grade students were recruited from 100 counties in 31 provinces in China. Only 54.2% of the students had accessed the Internet. According to the criteria of Young's Diagnostic Questionnaire (YDQ), an eight-item instrument, the prevalence of Internet addiction in the total sample was 6.3%, and among Internet users was 11.7%. Among the Internet users, males (14.8%) and rural students (12.1%) reported Internet addiction more than females (7.0%) and urban students (10.6%). The percentage of Internet addicts in elementary school students (11.5%) was not significantly lower than the percentage of middle school students (11.9%). There was no statistically significant difference between the four geographical regions (9.6%, 11.5%, 12.3%, 11.1%) characterized by different levels of economy, health, education, and social environment. As the frequency of Internet use and time spent online per week increased, the percentage of Internet addicts increased. When considering the location and purpose of Internet use, the percentage of Internet addicts was highest in adolescents typically surfing in Internet cafes (18.1%) and playing Internet games (22.5%). PMID:23971432

  5. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  6. Trace metals analysis of hair samples from students in metropolitan area high school

    International Nuclear Information System (INIS)

    Chiu, S.F.; Wang, P.C.; Kao, P.F.; Chung Shan Medical University, Taichung, Taiwan; Lin, J.B.; Chung Shan Medical University, Taichung, Taiwan; Lin, D.B.; Chen, C.Y.

    2011-01-01

    Hair samples from junior high school students in metropolitan areas of Taichung, Taiwan were tested for a total of 13 elements, Al, Ag, Br, Cl, Cr, Fe, K, La, Mn, Na, Sc, Se, and Zn by instrumental neutron activation analysis (INAA) to establish seasonal variations, gender and environmental exposures. The seasonal variations of hairs in 39 healthy students (18 males and 21 females; age 13.3 ± 0.4 years; height, 158.0 ± 4.1 cm; weight, 53.4 ± 5.7 kg) were collected at 1.5-month intervals for 1 year starting from late August, 2008. The concentrations of the above elements varied from 10 3 to 10 -2 μg g -1 at different sampling times. A quantified index of agreement (AT) was introduced to help classify the elements. A smaller AT indicated highly consistent quantities of specific metals in the hair while a larger AT indicated increased fluctuation, i.e., less agreement. The different ATs in various hair samples were discussed. The concentrations of these elements are compared with the data in the literature. (author)

  7. Multitasking behaviors of osteopathic medical students.

    Science.gov (United States)

    Shah, Ankit V; Mullens, Dustin J; Van Duyn, Lindsey J; Januchowski, Ronald P

    2014-08-01

    To the authors' knowledge, few studies have investigated the relationship between electronic media multitasking by undergraduate and graduate students during lecture and their academic performance, and reports that have looked into this behavior have neglected to investigate factors that may influence students' multitasking during lecture. To determine the extent to which medical students multitask during lecture; the types of multitasking; the frequency of multitasking and factors that influence frequency; and the correlation between multitasking and knowledge acquisition as assessed by a postlecture quiz. A 1-page survey assessing students' multitasking behavior was administered to 125 second-year students at Edward Via College of Osteopathic Medicine and collected at the onset of a standard 50-minute lecture. On completion of the 50-minute lecture, an unannounced 10-question multiple-choice quiz was given to assess knowledge acquisition during those lectures. On a separate date, after a standard 50-minute lecture, a second quiz was administered. The 1-page survey revealed that 98% of students check e-mail, 81% use social media, and 74% study for another class. Students spent the most time studying for another class (23 minutes) followed by using social media (13 minutes) and checking e-mail (7 minutes). The most influential factors behind multitasking were examination schedule (91%), lecturer (90%), and the number of lectures in the day (65%). The mean score for quiz 1 (the day after an examination) was 75%, and the mean score for quiz 2 (the day before an examination) was 60%. Multitasking during lecture is prominent among medical students, and examination schedule is the most influential factor. Although a robust drop in mean score on a lecture-based, unannounced quiz was identified 1 day before a scheduled examination, the effect from multitasking on this process remains unclear. © 2014 The American Osteopathic Association.

  8. Analyzing scheduling in the food-processing industry

    DEFF Research Database (Denmark)

    Akkerman, Renzo; van Donk, Dirk Pieter

    2009-01-01

    Production scheduling has been widely studied in several research areas, resulting in a large number of methods, prescriptions, and approaches. However, the impact on scheduling practice seems relatively low. This is also the case in the food-processing industry, where industry......-specific characteristics induce specific and complex scheduling problems. Based on ideas about decomposition of the scheduling task and the production process, we develop an analysis methodology for scheduling problems in food processing. This combines an analysis of structural (technological) elements of the production...... process with an analysis of the tasks of the scheduler. This helps to understand, describe, and structure scheduling problems in food processing, and forms a basis for improving scheduling and applying methods developed in literature. It also helps in evaluating the organisational structures...

  9. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  10. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  11. Optimal sampling designs for estimation of Plasmodium falciparum clearance rates in patients treated with artemisinin derivatives

    Science.gov (United States)

    2013-01-01

    Background The emergence of Plasmodium falciparum resistance to artemisinins in Southeast Asia threatens the control of malaria worldwide. The pharmacodynamic hallmark of artemisinin derivatives is rapid parasite clearance (a short parasite half-life), therefore, the in vivo phenotype of slow clearance defines the reduced susceptibility to the drug. Measurement of parasite counts every six hours during the first three days after treatment have been recommended to measure the parasite clearance half-life, but it remains unclear whether simpler sampling intervals and frequencies might also be sufficient to reliably estimate this parameter. Methods A total of 2,746 parasite density-time profiles were selected from 13 clinical trials in Thailand, Cambodia, Mali, Vietnam, and Kenya. In these studies, parasite densities were measured every six hours until negative after treatment with an artemisinin derivative (alone or in combination with a partner drug). The WWARN Parasite Clearance Estimator (PCE) tool was used to estimate “reference” half-lives from these six-hourly measurements. The effect of four alternative sampling schedules on half-life estimation was investigated, and compared to the reference half-life (time zero, 6, 12, 24 (A1); zero, 6, 18, 24 (A2); zero, 12, 18, 24 (A3) or zero, 12, 24 (A4) hours and then every 12 hours). Statistical bootstrap methods were used to estimate the sampling distribution of half-lives for parasite populations with different geometric mean half-lives. A simulation study was performed to investigate a suite of 16 potential alternative schedules and half-life estimates generated by each of the schedules were compared to the “true” half-life. The candidate schedules in the simulation study included (among others) six-hourly sampling, schedule A1, schedule A4, and a convenience sampling schedule at six, seven, 24, 25, 48 and 49 hours. Results The median (range) parasite half-life for all clinical studies combined was 3.1 (0

  12. Fear of failure among a sample of Jordanian undergraduate students

    Directory of Open Access Journals (Sweden)

    Alkhazaleh ZM

    2016-03-01

    Full Text Available Ziad M Alkhazaleh, Ahmad M Mahasneh Department of Educational Psychology, Faculty of Education Sciences, The Hashemite University, Zarqa, Jordan Background: Fear of failure (FoF is the motivation to avoid failure in achievement tests, and involves cognitive, behavioral, and emotional experiences. Aims: The primary purpose of this study was to determine the level of FoF among students at The Hashemite University, Jordan. We were also interested in identifying the difference in the level of FoF between the sexes, the academic level, and grade-point average (GPA. Method: A total of 548 students participated in the study by completing the Performance Failure Appraisal Inventory. Descriptive statistics (mean and SD, independent sample t-test, and one-way analysis of variance were used to analyze the data collected. Results: The results indicated the overall mean FoF to be –0.34. There were also significant differences between male and female students' level of fear in experiencing shame and embarrassment. Significant differences were found between the four academic level groups in the following fear categories: experiencing shame and embarrassment, important others losing interest, and fear of upsetting important others. The results also showed significant differences between the GPA level groups in the following fear categories: experiencing shame and embarrassment, diminishing of one's self-esteem, having an uncertain future, fear of important others losing interest, and fear of upsetting important others. Conclusion: FoF may be an important consideration when trying to understand student behavior in the university. Moreover, the level of FoF differs between sexes, academic levels, and GPA levels. Keywords: fear, fear of failure, Jordanian students

  13. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  14. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  15. Beyond the "science of sophomores": does the rational choice explanation of crime generalize from university students to an actual offender sample?

    Science.gov (United States)

    Bouffard, Jeff; Bry, Jeff; Smith, Shamayne; Bry, Rhonda

    2008-12-01

    Much of the criminological literature testing rational choice theory has utilized hypothetical scenarios presented to university students. Although this research generally supports rational choice theory, a common criticism is that conclusions from these studies may not generalize to samples of actual offenders. This study proceeds to examine this issue in two steps. First, a traditional sample of university students is examined to determine how various costs and benefits relate to their hypothetical likelihood of offending. Then the same data collection procedures are employed with a somewhat different sample of younger, adjudicated, and institutionalized offenders to determine whether the conclusions drawn from the student sample generalize to this offender sample. Results generally suggest that the content and process of hypothetical criminal decision making differ in the sample of known offenders relative to the university students. Limitations of the current study, as well as suggestions for future research, are discussed.

  16. An Experimental Study of Scheduling and Duration of "Tier 2" First-Grade Reading Intervention

    Science.gov (United States)

    Denton, Carolyn A.; Cirino, Paul T.; Barth, Amy E.; Romain, Melissa; Vaughn, Sharon; Wexler, Jade; Francis, David J.; Fletcher, Jack M.

    2011-01-01

    This study compared the effects on reading outcomes of delivering supplemental, small-group intervention to first-grade students at risk for reading difficulties randomly assigned to one of three different treatment schedules: extended (4 sessions per week, 16 weeks; n = 66), concentrated (4 sessions per week, 8 weeks; n = 64), or distributed (2…

  17. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  18. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  19. Measuring and Reducing College Students' Procrastination

    Science.gov (United States)

    Perrin, Christopher J.; Miller, Neal; Haberlin, Alayna T.; Ivy, Jonathan W.; Meindl, James N.; Neef, Nancy A.

    2011-01-01

    We examined college students' procrastination when studying for weekly in-class quizzes. Two schedules of online practice quiz delivery were compared using a multiple baseline design. When online study material was made available noncontingently, students usually procrastinated. When access to additional study material was contingent on completing…

  20. Improving ambulatory saliva-sampling compliance in pregnant women: a randomized controlled study.

    Directory of Open Access Journals (Sweden)

    Julian Moeller

    Full Text Available OBJECTIVE: Noncompliance with scheduled ambulatory saliva sampling is common and has been associated with biased cortisol estimates in nonpregnant subjects. This study is the first to investigate in pregnant women strategies to improve ambulatory saliva-sampling compliance, and the association between sampling noncompliance and saliva cortisol estimates. METHODS: We instructed 64 pregnant women to collect eight scheduled saliva samples on two consecutive days each. Objective compliance with scheduled sampling times was assessed with a Medication Event Monitoring System and self-reported compliance with a paper-and-pencil diary. In a randomized controlled study, we estimated whether a disclosure intervention (informing women about objective compliance monitoring and a reminder intervention (use of acoustical reminders improved compliance. A mixed model analysis was used to estimate associations between women's objective compliance and their diurnal cortisol profiles, and between deviation from scheduled sampling and the cortisol concentration measured in the related sample. RESULTS: Self-reported compliance with a saliva-sampling protocol was 91%, and objective compliance was 70%. The disclosure intervention was associated with improved objective compliance (informed: 81%, noninformed: 60%, F(1,60  = 17.64, p<0.001, but not the reminder intervention (reminders: 68%, without reminders: 72%, F(1,60 = 0.78, p = 0.379. Furthermore, a woman's increased objective compliance was associated with a higher diurnal cortisol profile, F(2,64  = 8.22, p<0.001. Altered cortisol levels were observed in less objective compliant samples, F(1,705  = 7.38, p = 0.007, with delayed sampling associated with lower cortisol levels. CONCLUSIONS: The results suggest that in pregnant women, objective noncompliance with scheduled ambulatory saliva sampling is common and is associated with biased cortisol estimates. To improve sampling compliance, results suggest

  1. Supporting Students to Develop Concepts Underlying Sampling and to Shuttle Between Contextual and Statistical Spheres

    NARCIS (Netherlands)

    Bakker, A.; Dierdorp, A.; Maanen, J.A. van; Eijkelhof, H.M.C.

    2012-01-01

    To stimulate students’ shuttling between contextual and statistical spheres, we based tasks on professional practices. This article focuses on two tasks to support reasoning about sampling by students aged 16-17. The purpose of the tasks was to find out which smaller sample size would have been

  2. Expectations and voluntary attrition in nursing students.

    Science.gov (United States)

    O'Donnell, Hugh

    2011-01-01

    This paper presents a series of findings generated during a larger study which aimed to develop a theoretical understanding of the reasons why nursing students voluntarily leave pre-registration nursing programmes. In this study, significant incongruence was found to exist between student expectations of pre-registration nursing programmes and the reality of these programmes following entry. The resulting dissonance was identified as an important factor in student decisions to voluntarily withdraw. A single case study design was selected to explore the causes of voluntary attrition in nursing students within a School of Nursing and Midwifery. The study population was obtained through purposeful sampling and consisted of 15 students who had previously voluntarily withdrawn from pre-registration nursing programmes. A semi-structured interview method was used to collect data from study participants. The interview schedule developed for use in the study reflected the key components of the conceptual model of higher education (HE) student attrition (Tinto, 1975, 1987, 1993). All interviews were tape recorded to facilitate later transcription. The Cyclical or Interactive Model of Qualitative Research (Miles and Huberman, 1994) was used to analyse data collected from study participants. This paper describes the unrealistic range of expectations which nursing students have of nursing, the information sources and experiences which inform student expectations and how ambiguous expectations contributed to voluntarily attrition. Copyright © 2010 Elsevier Ltd. All rights reserved.

  3. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  4. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  5. Genetic algorithm parameters tuning for resource-constrained project scheduling problem

    Science.gov (United States)

    Tian, Xingke; Yuan, Shengrui

    2018-04-01

    Project Scheduling Problem (RCPSP) is a kind of important scheduling problem. To achieve a certain optimal goal such as the shortest duration, the smallest cost, the resource balance and so on, it is required to arrange the start and finish of all tasks under the condition of satisfying project timing constraints and resource constraints. In theory, the problem belongs to the NP-hard problem, and the model is abundant. Many combinatorial optimization problems are special cases of RCPSP, such as job shop scheduling, flow shop scheduling and so on. At present, the genetic algorithm (GA) has been used to deal with the classical RCPSP problem and achieved remarkable results. Vast scholars have also studied the improved genetic algorithm for the RCPSP problem, which makes it to solve the RCPSP problem more efficiently and accurately. However, for the selection of the main parameters of the genetic algorithm, there is no parameter optimization in these studies. Generally, we used the empirical method, but it cannot ensure to meet the optimal parameters. In this paper, the problem was carried out, which is the blind selection of parameters in the process of solving the RCPSP problem. We made sampling analysis, the establishment of proxy model and ultimately solved the optimal parameters.

  6. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  7. Acculturation and substance use in a Mexican American college student sample.

    Science.gov (United States)

    Mercado, Alfonso; Ramirez, Maria; Sharma, Rachita; Popan, Jason; Avalos Latorre, Maria Luisa

    2017-01-01

    Although the association between acculturation and substance use among Latino groups is important, it is often understudied, especially within specific Latino groups living in geographically distinct communities, such as the Mexican American population in South Texas. The researchers of this study aimed to better understand the effect of acculturation on substance use and alcohol dependence in a Mexican American college student population. This survey study investigated the correlation between acculturation and substance use and dependence by using the Vancouver Index of Acculturation (VIA), items related to substance use (nicotine, marijuana, and cocaine) in a Mexican American college student sample (N = 1,494), and the Short Alcohol Dependence Data Questionnaire (SADD; N = 715). The study was conducted in the Texas-Mexico border region. The results suggest that higher levels of acculturation do not predict increased drug use or alcohol dependence in the Mexican American college students. However, acculturation was found to be associated with lower use of cocaine and marijuana. The discussion examines commonalities and differences in drug use and dependence. Specifically, acculturation seems to have an inverse relationship to substance use and may serve as a protective factor to licit and illicit drug use among Mexican American college students.

  8. A new variable interval schedule with constant hazard rate and finite time range.

    Science.gov (United States)

    Bugallo, Mehdi; Machado, Armando; Vasconcelos, Marco

    2018-05-27

    We propose a new variable interval (VI) schedule that achieves constant probability of reinforcement in time while using a bounded range of intervals. By sampling each trial duration from a uniform distribution ranging from 0 to 2 T seconds, and then applying a reinforcement rule that depends linearly on trial duration, the schedule alternates reinforced and unreinforced trials, each less than 2 T seconds, while preserving a constant hazard function. © 2018 Society for the Experimental Analysis of Behavior.

  9. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  10. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  11. A real-time Excel-based scheduling solution for nursing staff reallocation.

    Science.gov (United States)

    Tuominen, Outi Anneli; Lundgren-Laine, Heljä; Kauppila, Wiveka; Hupli, Maija; Salanterä, Sanna

    2016-09-30

    Aim This article describes the development and testing of an Excel-based scheduling solution for the flexible allocation and reallocation of nurses to cover sudden, unplanned absences among permanent nursing staff. Method A quasi-experimental, one group, pre- and post-test study design was used ( Box 1 ) with total sampling. Participants (n=17) were selected purposefully by including all ward managers (n=8) and assistant ward managers (n=9) from one university hospital department. The number of sudden absences among the nursing staff was identified during two 4-week data collection periods (pre- and post-test). Results During the use of the paper-based scheduling system, 121 absences were identified; during the use of the Excel-based system, 106 were identified. The main reasons for the use of flexible 'floating' nurses were sick leave (n=66) and workload (n=31). Other reasons (n=29) included patient transfer to another hospital, scheduling errors and the start or end of employment. Conclusion The Excel-based scheduling solution offered better support in obtaining substitute labour inside the organisation, with smaller employment costs. It also reduced the number of tasks ward managers had to carry out during the process of reallocating staff.

  12. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  13. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  14. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  15. Optimizing the Steel Plate Storage Yard Crane Scheduling Problem Using a Two Stage Planning/Scheduling Approach

    DEFF Research Database (Denmark)

    Hansen, Anders Dohn; Clausen, Jens

    This paper presents the Steel Plate Storage Yard Crane Scheduling Problem. The task is to generate a schedule for two gantry cranes sharing tracks. The schedule must comply with a number of constraints and at the same time be cost efficient. We propose some ideas for a two stage planning...

  16. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  17. Developing pre-qualification inter-professional education for nursing and medical students: sampling student attitudes to guide development.

    Science.gov (United States)

    Morison, Sue; Boohan, Mairead; Moutray, Marianne; Jenkins, John

    2004-03-01

    Teamwork and collaboration are regarded as important goals for health and social care education and inter-professional education (IPE) the vehicle to achieve this. However, there is debate concerning the best strategies for implementation, location and delivery of IPE. This exploratory study was undertaken to anticipate some of the problems of implementing a pre-qualification IPE programme for Children's Branch nursing students and medical students undertaking a Paediatrics module and to identify strategies to maximise success. A modified version of the readiness for inter-professional learning scale (RIPLS), including additional open-ended questions, was used with a convenient, purposeful sample of 20 medical and 10 nursing students. Both groups regarded learning team-working skills as important. Medical students regarded IPE as a means to learn about team-work and professional roles otherwise they indicated a preference for a discipline-based approach. Both groups were found to have acquired a strong sense of their own professional role. Both perceived IPE as disadvantageous if it impeded their own professional learning. Results also highlighted the importance of class size, stage of learning, appropriate skills and subject in IPE planning. We conclude that a small exploratory study can provide a useful guide for programme planning and additional qualitative data can enable a more comprehensive explanation of results.

  18. Networking in Sport Management: Ideas and Activities to Enhance Student Engagement and Career Development

    Directory of Open Access Journals (Sweden)

    Alan S. Kornspan

    2013-01-01

    Full Text Available The primary purpose of this paper is to present information regarding the development of networking skills to enhance the career development of sport management students. Specifically, literature is reviewed which supports the importance of networking in the attainment of employment and career advancement in the sport industry. This is followed by an overview of emerging networking activities that allow opportunities for sport management students to expand their network. Sport industry career fairs and career conferences that students can attend are discussed. Additionally, sport industry professional associations that students can become involved with are presented. This is then followed with information related to the development of sport management clubs and various events that can be promoted to enhance the networking process. Specifically, activities provided by university faculty to enhance the educational experience of sport management students are detailed. Finally, a sample schedule of semester activities focused on student engagement and networking activities is provided.

  19. Implementation of Block Scheduling in a Four-Year High School: A Literary Review and a Handbook for Administrators, Teachers and Parents.

    Science.gov (United States)

    Scroggins, Gary V.; Karr-Kidwell, PJ

    High schools today face problems of culturally diverse student populations, diversity of student learning styles, and a growing public perception that high schools do not adequately prepare their graduates for either work or college. This paper offers an extensive review of literature on block scheduling as well as a handbook for gaining support…

  20. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  1. Applying dynamic priority scheduling scheme to static systems of pinwheel task model in power-aware scheduling.

    Science.gov (United States)

    Seol, Ye-In; Kim, Young-Kuk

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.

  2. How Sample Size Affects a Sampling Distribution

    Science.gov (United States)

    Mulekar, Madhuri S.; Siegel, Murray H.

    2009-01-01

    If students are to understand inferential statistics successfully, they must have a profound understanding of the nature of the sampling distribution. Specifically, they must comprehend the determination of the expected value and standard error of a sampling distribution as well as the meaning of the central limit theorem. Many students in a high…

  3. Does Birth Order and Academic Proficiency Influence Perfectionistic Self-presentation Among Undergraduate Engineering Students? A Descriptive Analysis.

    Science.gov (United States)

    Louis, Preeti Tabitha; Kumar, Navin

    2016-01-01

    Perfectionism is a multifaceted concept. It had both advantages and disadvantages. Perfectionistic traits have been associated with leadership and very intellectual people. The present study is an attempt to understand if engineering students possess perfectionistic orientation and whether it influences self-efficacy, social connectedness, and achievement motivation. The present study adopts a random sampling design to evaluate the presence of perfectionism as a personality trait among undergraduate engineering students ( N = 320). Standardized inventories such as Almost Perfect Scale-Revised were administered first to identify perfectionists and second to differentiate the adaptive from the maladaptive perfectionists. Scheduled interviews were conducted with students to obtain information regarding birth order and family functioning. Findings from the study reveal that there were a significant number of maladaptive perfectionists and that they experienced higher levels of personal and societal demands leading to a negative emotional well-being in comparison to the adaptive perfectionists. We also observed that first-born children were more likely to display a perfectionistic self-presentation and from scheduled interviews, we understood that paternal influences were stronger when it came to decision-making and display of conscientiousness. The study draws on important implications for helping students to understand perfectionism and to respond to demands of the family and societal subsystems in a positive and an adaptive manner.

  4. The Relationship between Active Coping and Trait Resilience across U.S. and Taiwanese College Student Samples

    Science.gov (United States)

    Li, Ming-Hui; Nishikawa, Takeshi

    2012-01-01

    This study compared predictors of active coping (people's tendency to actively cope with stress) among college students in the United States and Taiwan. In both samples, trait resilience predicted active coping and mediated the effect of self-efficacy on active coping. The findings indicate that trait resilience influences college students' active…

  5. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  6. Structural validity and reliability of the Positive and Negative Affect Schedule (PANAS): evidence from a large Brazilian community sample.

    Science.gov (United States)

    Carvalho, Hudson W de; Andreoli, Sérgio B; Lara, Diogo R; Patrick, Christopher J; Quintana, Maria Inês; Bressan, Rodrigo A; Melo, Marcelo F de; Mari, Jair de J; Jorge, Miguel R

    2013-01-01

    Positive and negative affect are the two psychobiological-dispositional dimensions reflecting proneness to positive and negative activation that influence the extent to which individuals experience life events as joyful or as distressful. The Positive and Negative Affect Schedule (PANAS) is a structured questionnaire that provides independent indexes of positive and negative affect. This study aimed to validate a Brazilian interview-version of the PANAS by means of factor and internal consistency analysis. A representative community sample of 3,728 individuals residing in the cities of São Paulo and Rio de Janeiro, Brazil, voluntarily completed the PANAS. Exploratory structural equation model analysis was based on maximum likelihood estimation and reliability was calculated via Cronbach's alpha coefficient. Our results provide support for the hypothesis that the PANAS reliably measures two distinct dimensions of positive and negative affect. The structure and reliability of the Brazilian version of the PANAS are consistent with those of its original version. Taken together, these results attest the validity of the Brazilian adaptation of the instrument.

  7. The Alcohol Use Disorders Identification Scale (AUDIT) normative scores for a multiracial sample of Rhodes University residence students.

    Science.gov (United States)

    Young, Charles; Mayson, Tamara

    2010-06-01

    The objective of this research is to obtain accurate drinking norms for students living in the university residences in preparation for future social norms interventions that would allow individual students to compare their drinking to an appropriate reference group. Random cluster sampling was used to obtain data from 318 residence students who completed the Alcohol Use Disorders Identification Test (AUDIT), a brief, reliable and valid screening measure designed by the World Health Organisation (Babor et al. 2001). The Cronbach alpha coefficient of 0.83 reported for this multicultural sample is high, suggesting that the AUDIT may be reliably used in this and similar contexts. Normative scores are reported in the form of percentiles. Comparisons between the portions of students drinking safely and hazardously according to race and gender indicate that while male students are drinking no more hazardously than female students, white students drink far more hazardously than black students. These differences suggest that both race- and gender-specific norms would be essential for an effective social norms intervention in this multicultural South African context. Finally, the racialised drinking patterns might reflect an informal segregation of social space at Rhodes University.

  8. Enrich the Physics Curriculum Scheduled for Students of Intermediate School E-Learning and Its Effectiveness in Scientific Thinking and Their Attitude towards the Development of Physics

    Science.gov (United States)

    Hameed, Saddam Mohammed; Mohammed, Essam Mahmoud

    2016-01-01

    The current research aims know the effectiveness of enriching the physics curriculum for students in middle school electronic learning in the development of their thinking and scientific their direction towards physics, sample formed from second grade students in Sinae intermediate school 64 students (32) student as experimental group & (32)…

  9. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  10. Tobacco Smoking Status and Perception of Health among a Sample of Jordanian Students

    Directory of Open Access Journals (Sweden)

    Sukaina Alzyoud

    2014-07-01

    Full Text Available Limited data are available from Jordan examining patterns of tobacco use among adolescents, or how use is related to health perceptions. This study aims to estimate the prevalence of tobacco use and to assess the relationship between use and health-related perceptions. A cross-sectional survey was conducted among a sample of 11–18 year old school students from a major governorate in Jordan. Using a multistage random sampling 1050 students were selected. Students were categorized as non-smokers, cigarette-only smokers, waterpipe-only smokers, or dual smokers. Rates of waterpipe-only and cigarette-only smoking were 7% and 3%, respectively, and were similar for boys and girls. In contrast, the rate of dual use was much higher than for single product use and was double in girls compared to boys (34% vs. 17%. Dual-smokers were significantly more likely to think that it is safe to smoke as long as the person intends to quit within two years compared to non-smokers, and had lower self-rated health status than other groups. This is the first study among Arab adolescents to document high rates of dual tobacco use, especially pronounced among girls. The study findings have significant implications for designing tobacco smoking prevention programs for school health settings.

  11. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  12. Nonlinear observer output-feedback MPC treatment scheduling for HIV

    Directory of Open Access Journals (Sweden)

    Zurakowski Ryan

    2011-05-01

    Full Text Available Abstract Background Mathematical models of the immune response to the Human Immunodeficiency Virus demonstrate the potential for dynamic schedules of Highly Active Anti-Retroviral Therapy to enhance Cytotoxic Lymphocyte-mediated control of HIV infection. Methods In previous work we have developed a model predictive control (MPC based method for determining optimal treatment interruption schedules for this purpose. In this paper, we introduce a nonlinear observer for the HIV-immune response system and an integrated output-feedback MPC approach for implementing the treatment interruption scheduling algorithm using the easily available viral load measurements. We use Monte-Carlo approaches to test robustness of the algorithm. Results The nonlinear observer shows robust state tracking while preserving state positivity both for continuous and discrete measurements. The integrated output-feedback MPC algorithm stabilizes the desired steady-state. Monte-Carlo testing shows significant robustness to modeling error, with 90% success rates in stabilizing the desired steady-state with 15% variance from nominal on all model parameters. Conclusions The possibility of enhancing immune responsiveness to HIV through dynamic scheduling of treatment is exciting. Output-feedback Model Predictive Control is uniquely well-suited to solutions of these types of problems. The unique constraints of state positivity and very slow sampling are addressable by using a special-purpose nonlinear state estimator, as described in this paper. This shows the possibility of using output-feedback MPC-based algorithms for this purpose.

  13. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  14. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  15. John's Big Moka: Student Resistance and Democratic Citizenship

    Science.gov (United States)

    Mihelich, John

    2008-01-01

    In a reflective essay about experiential learning in the classroom, the author discusses a spontaneous student protest movement and how embracing student resistance as engagement can enhance the learning experience and foster a critical pedagogy. Students in an anthropology class attempted to organize a boycott of a scheduled quiz and, in doing…

  16. Technology for planning and scheduling under complex constraints

    Science.gov (United States)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  17. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  18. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  19. The Student Storm Survey©: College Students' Thoughts on Their University's Response to a Natural Disaster

    Science.gov (United States)

    Rosenthal, Gary T.; Boudreaux, Monique; Boudreaux, Dwight L.; Soignier, R. D.; Folse, Earl; Frias, Tracey; Soper, Barlow

    2014-01-01

    Hurricanes Gustav and Ike devastated the region that our University serves. Near the start of the semester, only one of the ten scheduled class days could be completed and administrators asked students and faculty to "continue the learning process" online via Blackboard©, our Electronic Delivery System (EDS). The Student Storm Survey©…

  20. Improving Energy Saving Techniques by Ambient Intelligence Scheduling

    DEFF Research Database (Denmark)

    Cristani, Matteo; Karafili, Erisa; Tomazzoli, Claudio

    2015-01-01

    Energy saving is one of the most challenging aspects of modern ambient intelligence technologies, for both domestic and business usages. In this paper we show how to combine Ambient Intelligence and Artificial Intelligence techniques to solve the problem of scheduling a set of devices under a given...... for Ambient Intelligence to a specific framework and exhibit a sample usage for a real life system, Elettra, that is in use in an industrial context....

  1. Data analysis with the DIANA meta-scheduling approach

    International Nuclear Information System (INIS)

    Anjum, A; McClatchey, R; Willers, I

    2008-01-01

    The concepts, design and evaluation of the Data Intensive and Network Aware (DIANA) meta-scheduling approach for solving the challenges of data analysis being faced by CERN experiments are discussed in this paper. Our results suggest that data analysis can be made robust by employing fault tolerant and decentralized meta-scheduling algorithms supported in our DIANA meta-scheduler. The DIANA meta-scheduler supports data intensive bulk scheduling, is network aware and follows a policy centric meta-scheduling. In this paper, we demonstrate that a decentralized and dynamic meta-scheduling approach is an effective strategy to cope with increasing numbers of users, jobs and datasets. We present 'quality of service' related statistics for physics analysis through the application of a policy centric fair-share scheduling model. The DIANA meta-schedulers create a peer-to-peer hierarchy of schedulers to accomplish resource management that changes with evolving loads and is dynamic and adapts to the volatile nature of the resources

  2. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  3. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  4. Optimization Technique With Sensitivity Analysis On Menu Scheduling For Boarding School Student Aged 13-18 Using “Sufahani-Ismail Algorithm”

    Science.gov (United States)

    Sudin, Azila M.; Sufahani, Suliadi

    2018-04-01

    Boarding school student aged 13-18 need to eat nutritious meals which contains proper calories, vitality and nutrients for appropriate development with a specific end goal to repair and upkeep the body tissues. Furthermore, it averts undesired diseases and contamination. Serving healthier food is a noteworthy stride towards accomplishing that goal. However, arranging a nutritious and balance menu manually is convoluted, wasteful and tedious. Therefore, the aim of this study is to develop a mathematical model with an optimization technique for menu scheduling that fulfill the whole supplement prerequisite for boarding school student, reduce processing time, minimize the budget and furthermore serve assortment type of food each day. It additionally gives the flexibility for the cook to choose any food to be considered in the beginning of the process and change any favored menu even after the ideal arrangement and optimal solution has been obtained. This is called sensitivity analysis. A recalculation procedure will be performed in light of the ideal arrangement and seven days menu was produced. The data was gathered from the Malaysian Ministry of Education and schools authorities. Menu arranging is a known optimization problem. Therefore Binary Programming alongside optimization technique and “Sufahani-Ismail Algorithm” were utilized to take care of this issue. In future, this model can be implemented to other menu problem, for example, for sports, endless disease patients, militaries, colleges, healing facilities and nursing homes.

  5. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  6. A study among dental students regarding the factors influenced dental students to choose dentistry as career

    Science.gov (United States)

    AnbuSelvan, Gobichetti Palayam Jagatheeswaran; Gokulnathan, Subramaniam; PrabuRajan, Vilvanathan; RajaRaman, Gangadharan; Kumar, Singaravelu Suresh; Thagavelu, Arthie

    2013-01-01

    Introduction: Career choice is a complex decision for students since it determines the kind of profession that they intend to pursue in life. As students try to make a career choice while in secondary school, they face the problem of matching their career choices with their abilities and school performance. Aims: The purpose of this study was to examine factors influencing career choice among dental college students in private dental collages in Tamil Nadu, India. Settings and Design: The study was conducted using descriptive survey design with a population of 989 students. The data for this study was collected using a questionnaire and interview schedules. Materials and Methods: The data for this study was collected using questionnaire previously used by Swati Shah and Rajaraman and interview schedules. The analysis of the study was based on the factors: Outcome expectations, gender, personal interests, and other factors. Results and Conclusion: The most common reason for among the dental students to choose dental science as their career choice was self-interested followed by didn′t get medicine degree, prestige and gives respect. The least common reasons observed in the study population were inspired by dentists. The findings of this study indicate that availability the most influential factors affecting career choices among students. PMID:23946573

  7. Perceptions of Rape and Attitudes toward Women in a Sample of Lebanese Students

    Science.gov (United States)

    Rebeiz, Maria J.; Harb, Charles

    2010-01-01

    This study investigated values, ambivalent sexism, religiosity, religious differences, gender, and attitudes toward rape victims as predictors of rape myths in a sample of Lebanese students (N = 300). Values of self-transcendence and conservation, gender, hostile sexism, and attitudes toward rape victims emerged as significant predictors of rape…

  8. The Association between Mental Health and Violence among a Nationally Representative Sample of College Students from the United States.

    Science.gov (United States)

    Schwartz, Joseph A; Beaver, Kevin M; Barnes, J C

    2015-01-01

    Recent violent attacks on college campuses in the United States have sparked discussions regarding the prevalence of psychiatric disorders and the perpetration of violence among college students. While previous studies have examined the potential association between mental health problems and violent behavior, the overall pattern of findings flowing from this literature remain mixed and no previous studies have examined such associations among college students. The current study makes use of a nationally representative sample of 3,929 college students from the National Epidemiologic Study on Alcohol and Related Conditions (NESARC) to examine the prevalence of seven violent behaviors and 19 psychiatric disorder diagnoses tapping mood, anxiety, personality, and substance use disorders. Associations between individual and composite psychiatric disorder diagnoses and violent behaviors were also examined. Additional analyses were adjusted for the comorbidity of multiple psychiatric diagnoses. The results revealed that college students were less likely to have engaged in violent behavior relative to the non-student sample, but a substantial portion of college students had engaged in violent behavior. Age- and sex-standardized prevalence rates indicated that more than 21% of college students reported at least one violent act. In addition, more than 36% of college students had at least one diagnosable psychiatric disorder. Finally, the prevalence of one or more psychiatric disorders significantly increased the odds of violent behavior within the college student sample. These findings indicate that violence and psychiatric disorders are prevalent on college campuses in the United States, though perhaps less so than in the general population. In addition, college students who have diagnosable psychiatric disorders are significantly more likely to engage in various forms of violent behavior.

  9. Interactive Dynamic Mission Scheduling for ASCA

    Science.gov (United States)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  10. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  11. A tracking system for groundwater sampling and data transfer schedules

    International Nuclear Information System (INIS)

    Mercier, T.M.

    1990-12-01

    Since groundwater monitoring programs at the Oak Ridge Y-12 Plant have become more complex and varied and as the occasions to respond to internal and external reporting requirements have become more frequent and time constrained, the need to track groundwater sampling activities and data transfer from the analytical laboratories has become imperative. If backlogs can be caught early, resources can be added or reallocated in the field and in the laboratory in a timely manner to ensure reporting deadlines are met. The tracking system discussed in this paper starts with clear definition of the groundwater monitoring program at the facility. This information is input into base datasets at the beginning of the sampling cycle. As the sampling program progresses, information about well sampling dates and data transfer dates is input into the base datasets. From the base program data and the update data, a status report is periodically generated by a computer program which identifies the type and nature of bottle necks encountered during the implementation of the groundwater monitoring program

  12. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  13. An examination of the validity of the Academic Motivation Scale with a United States business student sample.

    Science.gov (United States)

    Smith, Kenneth J; Davy, Jeanette A; Rosenberg, Donald L

    2010-04-01

    This study examined alternative seven-, five-, and three-factor structures for the Academic Motivation Scale, with data from a large convenience sample of 2,078 students matriculating in various business courses at three AACSB-accredited regional comprehensive universities. In addition, the invariance of the scale's factor structure between male and female students and between undergraduate and Master's of Business Administration students was investigated. Finally, the internal consistency of the items loading on each of the seven AMS subscales was assessed as well as whether the correlations among the subscales supported a continuum of self-determination. Results for the full sample as well as the targeted subpopulations supported the seven factor configuration of the scale with adequate model fit achieved for all but the MBA student group. The data also generated acceptable internal consistency statistics for all of the subscales. However, in line with a number of previous studies, the correlations between subscales failed to fully support the scale's simplex structure as proposed by self-determination theory.

  14. Planning Risk-Based SQC Schedules for Bracketed Operation of Continuous Production Analyzers.

    Science.gov (United States)

    Westgard, James O; Bayat, Hassan; Westgard, Sten A

    2018-02-01

    To minimize patient risk, "bracketed" statistical quality control (SQC) is recommended in the new CLSI guidelines for SQC (C24-Ed4). Bracketed SQC requires that a QC event both precedes and follows (brackets) a group of patient samples. In optimizing a QC schedule, the frequency of QC or run size becomes an important planning consideration to maintain quality and also facilitate responsive reporting of results from continuous operation of high production analytic systems. Different plans for optimizing a bracketed SQC schedule were investigated on the basis of Parvin's model for patient risk and CLSI C24-Ed4's recommendations for establishing QC schedules. A Sigma-metric run size nomogram was used to evaluate different QC schedules for processes of different sigma performance. For high Sigma performance, an effective SQC approach is to employ a multistage QC procedure utilizing a "startup" design at the beginning of production and a "monitor" design periodically throughout production. Example QC schedules are illustrated for applications with measurement procedures having 6-σ, 5-σ, and 4-σ performance. Continuous production analyzers that demonstrate high σ performance can be effectively controlled with multistage SQC designs that employ a startup QC event followed by periodic monitoring or bracketing QC events. Such designs can be optimized to minimize the risk of harm to patients. © 2017 American Association for Clinical Chemistry.

  15. Why sample selection matters in exploratory factor analysis: implications for the 12-item World Health Organization Disability Assessment Schedule 2.0.

    Science.gov (United States)

    Gaskin, Cadeyrn J; Lambert, Sylvie D; Bowe, Steven J; Orellana, Liliana

    2017-03-11

    Sample selection can substantially affect the solutions generated using exploratory factor analysis. Validation studies of the 12-item World Health Organization (WHO) Disability Assessment Schedule 2.0 (WHODAS 2.0) have generally involved samples in which substantial proportions of people had no, or minimal, disability. With the WHODAS 2.0 oriented towards measuring disability across six life domains (cognition, mobility, self-care, getting along, life activities, and participation in society), performing factor analysis with samples of people with disability may be more appropriate. We determined the influence of the sampling strategy on (a) the number of factors extracted and (b) the factor structure of the WHODAS 2.0. Using data from adults aged 50+ from the six countries in Wave 1 of the WHO's longitudinal Study on global AGEing and adult health (SAGE), we repeatedly selected samples (n = 750) using two strategies: (1) simple random sampling that reproduced nationally representative distributions of WHODAS 2.0 summary scores for each country (i.e., positively skewed distributions with many zero scores indicating the absence of disability), and (2) stratified random sampling with weights designed to obtain approximately symmetric distributions of summary scores for each country (i.e. predominantly including people with varying degrees of disability). Samples with skewed distributions typically produced one-factor solutions, except for the two countries with the lowest percentages of zero scores, in which the majority of samples produced two factors. Samples with approximately symmetric distributions, generally produced two- or three-factor solutions. In the two-factor solutions, the getting along domain items loaded on one factor (commonly with a cognition domain item), with remaining items loading on a second factor. In the three-factor solutions, the getting along and self-care domain items loaded separately on two factors and three other domains

  16. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  17. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  18. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  19. Limited Preemptive Scheduling in Real-time Systems

    OpenAIRE

    Thekkilakattil, Abhilash

    2016-01-01

    Preemptive and non-preemptive scheduling paradigms typically introduce undesirable side effects when scheduling real-time tasks, mainly in the form of preemption overheads and blocking, that potentially compromise timeliness guarantees. The high preemption overheads in preemptive real-time scheduling may imply high resource utilization, often requiring significant over-provisioning, e.g., pessimistic Worst Case Execution Time (WCET) approximations. Non-preemptive scheduling, on the other hand...

  20. Energy drink use, problem drinking and drinking motives in a diverse sample of Alaskan college students

    Directory of Open Access Journals (Sweden)

    Monica C. Skewes

    2013-08-01

    Full Text Available Background. Recent research has identified the use of caffeinated energy drinks as a common, potentially risky behaviour among college students that is linked to alcohol misuse and consequences. Research also suggests that energy drink consumption is related to other risky behaviours such as tobacco use, marijuana use and risky sexual activity. Objective. This research sought to examine the associations between frequency of energy drink consumption and problematic alcohol use, alcohol-related consequences, symptoms of alcohol dependence and drinking motives in an ethnically diverse sample of college students in Alaska. We also sought to examine whether ethnic group moderated these associations in the present sample of White, Alaska Native/American Indian and other ethnic minority college students. Design. A paper-and-pencil self-report questionnaire was completed by a sample of 298 college students. Analysis of covariance (ANCOVA was used to examine the effects of energy drink use, ethnic group and energy drink by ethnic group interactions on alcohol outcomes after controlling for variance attributed to gender, age and frequency of binge drinking. Results. Greater energy drink consumption was significantly associated with greater hazardous drinking, alcohol consequences, alcohol dependence symptoms, drinking for enhancement motives and drinking to cope. There were no main effects of ethnic group, and there were no significant energy drink by ethnic group interactions. Conclusion. These findings replicate those of other studies examining the associations between energy drink use and alcohol problems, but contrary to previous research we did not find ethnic minority status to be protective. It is possible that energy drink consumption may serve as a marker for other health risk behaviours among students of various ethnic groups.

  1. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  2. Sleep schedules and school performance in Indigenous Australian children.

    Science.gov (United States)

    Blunden, Sarah; Magee, Chris; Attard, Kelly; Clarkson, Larissa; Caputi, Peter; Skinner, Timothy

    2018-04-01

    Sleep duration and sleep schedule variability have been related to negative health and well-being outcomes in children, but little is known about Australian Indigenous children. Data for children aged 7-9 years came from the Australian Longitudinal Study of Indigenous Children and the National Assessment Program-Literacy and Numeracy (NAPLAN). Latent class analysis determined sleep classes taking into account sleep duration, bedtimes, waketimes, and variability in bedtimes from weekdays to weekends. Regression models tested whether the sleep classes were cross-sectionally associated with grade 3 NAPLAN scores. Latent change score modeling then examined whether the sleep classes predicted changes in NAPLAN performance from grades 3 to 5. Five sleep schedule classes were identified: normative sleep, early risers, long sleep, variable sleep, and short sleep. Overall, long sleepers performed best, with those with reduced sleep (short sleepers and early risers) performing the worse on grammar, numeracy, and writing performance. Latent change score results also showed that long sleepers performed best in spelling and writing and short sleepers and typical sleepers performed the worst over time. In this sample of Australian Indigenous children, short sleep was associated with poorer school performance compared with long sleep, with this performance worsening over time for some performance indicators. Other sleep schedules (eg, early wake times and variable sleep) also had some relationships with school performance. As sleep scheduling is modifiable, this offers opportunity for improvement in sleep and thus performance outcomes for these and potentially all children. Copyright © 2018 National Sleep Foundation. Published by Elsevier Inc. All rights reserved.

  3. Public Expenditure and Scheduled Community Enrolment in Higher Education: A Comparison across Indian States

    Science.gov (United States)

    Sumithra, S.; Vardhan, R. Vishnu; Aruna, C.

    2014-01-01

    In India, the gross enrolment ratio has increased from 13.1 per cent in 2007-2008 to 15 per cent in 2011-2012 which moves the country from elite to a mass higher education system. This article seeks to examine the enrolment of scheduled caste (SC) students across various states in the country and the expenditure by each state and its effect on SC…

  4. Utilization Bound of Non-preemptive Fixed Priority Schedulers

    Science.gov (United States)

    Park, Moonju; Chae, Jinseok

    It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.

  5. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  6. Human Papillomavirus (HPV) Risk Factors, Vaccination Patterns, and Vaccine Perceptions among a Sample of Male College Students

    Science.gov (United States)

    Fontenot, Holly B.; Collins Fantasia, Heidi; Charyk, Anna; Sutherland, Melissa A.

    2014-01-01

    Objective: To examine human papillomavirus (HPV) vaccination rates, including initiation and completion of the vaccine series, and barriers to vaccination in a sample of male college students. Participants: Male students between the ages of 18 and 25 who reported being currently or previously sexually active (N = 735). Methods: A cross-sectional…

  7. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  8. Group Elevator Peak Scheduling Based on Robust Optimization Model

    Directory of Open Access Journals (Sweden)

    ZHANG, J.

    2013-08-01

    Full Text Available Scheduling of Elevator Group Control System (EGCS is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is realized without getting exact numbers of each calling floor's waiting passengers. Specifically, energy-saving oriented multi-objective scheduling price is proposed, RO uncertain peak scheduling model is built to minimize the price. Because RO uncertain model could not be solved directly, RO uncertain model is transformed to RO certain model by elevator scheduling robust counterparts. Because solution space of elevator scheduling is enormous, to solve RO certain model in short time, ant colony solving algorithm for elevator scheduling is proposed. Based on the algorithm, optimal scheduling solutions are found quickly, and group elevators are scheduled according to the solutions. Simulation results show the method could improve scheduling performances effectively in peak pattern. Group elevators' efficient operation is realized by the RO scheduling method.

  9. Scheduling of Irrigation and Leaching Requirements

    Directory of Open Access Journals (Sweden)

    Amer Hassan Al-haddad

    2015-03-01

    Full Text Available Iraq depends mainly on Tigris and Euphrates Rivers to provide high percentage of agricultural water use for thousands years. At last years, Iraq is suffering from shortage in water resources due to global climate changes and unfair water politics of the neighboring countries, which affected the future of agriculture plans for irrigation, added to that the lack of developed systems of water management in the irrigation projects and improper allocation of irrigation water, which reduces water use efficiency and lead to losing irrigation water and decreasing in agricultural yield. This study aims at studying the usability of irrigation and leaching scheduling within the irrigating projects and putting a complete annual or seasonal irrigation program as a solution for the scarcity of irrigation water, the increase of irrigation efficiency, lessening the salinity in the projects and preparing an integral irrigation calendar through field measurements of soil physical properties and chemical for project selected and compared to the results of the irrigation scheduling and leaching with what is proposed by the designers. The process is accomplished by using a computer program which was designed by Water Resources Department at the University of Baghdad, with some modification to generalize it and made it applicable to various climatic zone and different soil types. Study area represented by large project located at the Tigris River, and this project was (Al-Amara irrigation project. Sufficient samples of project's soil were collected so as to identify soil physical and chemical properties and the salinity of soil and water as well as identifying the agrarian cycles virtually applied to this project. Finally, a comparison was conducted between the calculated water quantities and the suggested ones by the designers. The research results showed that using this kind of scheduling (previously prepared irrigation and leaching scheduling with its properties

  10. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  11. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  12. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  13. Job shop scheduling problem with late work criterion

    Science.gov (United States)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.

  14. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  15. Examination of the Evidence Base for Using Visual Activity Schedules with Students with Intellectual Disability

    Science.gov (United States)

    Spriggs, Amy D.; Mims, Pamela J.; van Dijk, Wilhelmina; Knight, Victoria F.

    2017-01-01

    We conducted a comprehensive review of the literature to establish the evidence base for using visual activity schedules (VAS) with individuals with intellectual disability. Literature published after 2005 was evaluated for quality using the criteria developed by Horner et al.; a total of 14 studies were included as acceptable. Findings suggest…

  16. Disability Status and Victimization Risk among a National Sample of College Students: A Lifestyles-Routine Activities Approach

    Science.gov (United States)

    Scherer, Heidi L.

    2011-01-01

    Over the past decade, several authors have conducted studies on samples of college students to gain a greater understanding of victimization among this population. This body of research has demonstrated that in comparison to the general public, college students are more likely to report having experienced sexual and stalking victimization. At the…

  17. Internet use and attitudes towards illicit internet use behavior in a sample of Russian college students.

    Science.gov (United States)

    Palesh, Oxana; Saltzman, Kasey; Koopman, Cheryl

    2004-10-01

    This study assessed Internet use and attitudes toward illicit use of the Internet in a sample of Russian college students. A sample comprised of 198 students was recruited from a university in Moscow. Each participant completed a survey assessing demographic characteristics, Internet use, and attitudes towards engaging in illicit behaviors over the Internet. About half of the students reported that they used the Internet at least several times a year, with 8% reporting daily use of the Internet. Among Internet users, most reported having Internet access either at home or at a friends' home, and 16 % reported having Internet access from work, school, or a computer center. Among Internet users, the main purpose was for school-related activities (60%), followed by e-mail (55%), entertainment (50%), chatting (24%), and searching for pornography (6%). Although most students thought it was inappropriate to read someone else's e-mail, use someone else's password or credit card information without their permission, or break into someone's computer, many students did endorse those illicit behaviors. Over a fifth of the students reported that they knew hackers. Forty three percent of students agreed that people make too much fuss about watching videos, movies or downloading music on the Internet without paying. Males were more likely than females to report using the Internet for entertainment purposes (p = 0.006) and were more likely to agree that it was okay to break into someone's computer (p = 0.04). The results of this study suggest that these Russian college students predominately use the Internet to help with their schoolwork, to communicate with others, and for entertainment. These results also suggest that interventions may be useful to change attitudes endorsing illicit uses of the Internet.

  18. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  19. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  20. Does Birth Order and Academic Proficiency Influence Perfectionistic Self-presentation Among Undergraduate Engineering Students? A Descriptive Analysis

    Science.gov (United States)

    Louis, Preeti Tabitha; Kumar, Navin

    2016-01-01

    Background: Perfectionism is a multifaceted concept. It had both advantages and disadvantages. Perfectionistic traits have been associated with leadership and very intellectual people. The present study is an attempt to understand if engineering students possess perfectionistic orientation and whether it influences self-efficacy, social connectedness, and achievement motivation. Materials and Methods: The present study adopts a random sampling design to evaluate the presence of perfectionism as a personality trait among undergraduate engineering students (N = 320). Standardized inventories such as Almost Perfect Scale-Revised were administered first to identify perfectionists and second to differentiate the adaptive from the maladaptive perfectionists. Scheduled interviews were conducted with students to obtain information regarding birth order and family functioning. Results: Findings from the study reveal that there were a significant number of maladaptive perfectionists and that they experienced higher levels of personal and societal demands leading to a negative emotional well-being in comparison to the adaptive perfectionists. We also observed that first-born children were more likely to display a perfectionistic self-presentation and from scheduled interviews, we understood that paternal influences were stronger when it came to decision-making and display of conscientiousness. Conclusion: The study draws on important implications for helping students to understand perfectionism and to respond to demands of the family and societal subsystems in a positive and an adaptive manner. PMID:27833225

  1. Scheduling nursing personnel on a microcomputer.

    Science.gov (United States)

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  2. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  3. PRACTICING FIELD HOCKEY SKILLS ALONG THE CONTEXTUAL INTERFERENCE CONTINUUM: A COMPARISON OF FIVE PRACTICE SCHEDULES

    Directory of Open Access Journals (Sweden)

    Jadeera Phaik Geok Cheong

    2012-06-01

    Full Text Available To overcome the weakness of the contextual interference (CI effect within applied settings, Brady, 2008 recommended that the amount of interference be manipulated. This study investigated the effect of five practice schedules on the learning of three field hockey skills. Fifty-five pre-university students performed a total of 90 trials for each skill under blocked, mixed or random practice orders. Results showed a significant time effect with all five practice conditions leading to improvements in acquisition and learning of the skills. No significant differences were found between the groups. The findings of the present study did not support the CI effect and suggest that either blocked, mixed, or random practice schedules can be used effectively when structuring practice for beginners

  4. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  5. Predictors and characteristics of anxiety among adolescent students: a Greek sample.

    Science.gov (United States)

    Lazaratou, H; Anagnostopoulos, D C; Vlassopoulos, M; Charbilas, D; Rotsika, V; Tsakanikos, E; Tzavara, Ch; Dikeos, D

    2013-01-01

    In the Greek society, there is a strong cultural tendency to overestimate the value of University studies. So students are under high emotional pressure during the long lasting period of the preparation for the university entrance exams. The aim of the present study was to evaluate the level of anxiety in a general adolescent population of senior high school students in Athens, Greece. Also to examine the association between the anxiety's severity with various demographic and socio-cultural factors, as well as with academic performance, extracurricular activities, sleep duration and presence of somatic problems. The sample consisted of 696 adolescent students of three Senior High Schools (SHS) (391 girls and 305 boys). Two of the schools were general education institutions (GE1 and GE2, N=450), while the third was a technical one (TE, N=246). The school sample was selected to reflect the proportion between the two different types of SHSs in Athens as well as other major urban areas in Greece. The State-Trait Anxiety Inventory was administered and personal data were also collected. Statistical significance was set at pmiddle for 154, high for 195 and mother's was low for 135, middle for 417, high for 140. The average sleep duration was 7.5 hours per day (SD=1.3). The average time per week spent in school related activities was 7.94 hours (SD=7.56) and in extracurricular activities was 9.02 hours (SD=12.44). 107 adolescents reported somatic complaints in the last year The academic achievement was poor for 233, good for 264, excellent for 196 students. Adolescents with extracurricular activities for more than 11 hours per week had lower scores, both on State and Trait scales. More hours in school-related activities were associated with greater levels of Trait anxiety. Adolescents whose father had a high educational level had lower scores on State anxiety compared to those whose father had a low educational level. Adolescents who reported the presence of somatic

  6. Brief-stimulus presentations on multiform tandem schedules

    OpenAIRE

    Reed, Phil

    1994-01-01

    Three experiments examined the influence of a brief stimulus (a light) on the behavior of food-deprived rats whose lever pressing on tandem schedules comprising components of different schedule types resulted in food presentation. In Experiment 1, either a tandem variable-ratio variable-interval or a tandem variable-interval variable-ratio schedule was used. The variable-interval requirement in the tandem variable-ratio variable-interval schedule was yoked to the time taken to complete the va...

  7. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  8. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  9. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  10. Developing optimal nurses work schedule using integer programming

    Science.gov (United States)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  11. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  12. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  13. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  14. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  15. Scheduling multimedia services in cloud computing environment

    Science.gov (United States)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  16. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  17. Analysis and Optimisation of Hierarchically Scheduled Multiprocessor Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2008-01-01

    We present an approach to the analysis and optimisation of heterogeneous multiprocessor embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organised in a hierarchy. In this paper, we first develop a holistic scheduling and schedulability analysis that determines the timing properties of a hierarchically scheduled system. Second, we address design problems that are characteristic to such hierarchically scheduled systems: assignment...... of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We also present several algorithms for solving these problems. Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilisation of the system...

  18. Flow shop scheduling with heterogeneous workers

    OpenAIRE

    Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier

    2014-01-01

    We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is motivated by Sheltered Work centers for Disabled, whose main objective is the labor integration of persons with disabilities, an important aim not only for these centers but for any company d...

  19. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  20. 21 CFR 113.83 - Establishing scheduled processes.

    Science.gov (United States)

    2010-04-01

    ... commercial production runs should be determined on the basis of recognized scientific methods to be of a size... CONTAINERS Production and Process Controls § 113.83 Establishing scheduled processes. Scheduled processes for... production shall be adequately provided for in establishing the scheduled process. Critical factors, e.g...

  1. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  2. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  3. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo [Technical Univ. of Lisbon (Portugal); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Center for Energy and Innovation Technologies (Austria); Bozchalui, Mohammed C. [NEC Laboratories American Inc., Irving, TX (United States); Sharma, Ratnesh [NEC Laboratories American Inc., Irving, TX (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbosa-Povoa, Ana [Technical Univ. of Lisbon (Portugal); Ferrao, Paulo [Technical Univ. of Lisbon (Portugal)

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  4. An improved sheep flock heredity algorithm for job shop scheduling and flow shop scheduling problems

    Directory of Open Access Journals (Sweden)

    Chandramouli Anandaraman

    2011-10-01

    Full Text Available Job Shop Scheduling Problem (JSSP and Flow Shop Scheduling Problem (FSSP are strong NP-complete combinatorial optimization problems among class of typical production scheduling problems. An improved Sheep Flock Heredity Algorithm (ISFHA is proposed in this paper to find a schedule of operations that can minimize makespan. In ISFHA, the pairwise mutation operation is replaced by a single point mutation process with a probabilistic property which guarantees the feasibility of the solutions in the local search domain. A Robust-Replace (R-R heuristic is introduced in place of chromosomal crossover to enhance the global search and to improve the convergence. The R-R heuristic is found to enhance the exploring potential of the algorithm and enrich the diversity of neighborhoods. Experimental results reveal the effectiveness of the proposed algorithm, whose optimization performance is markedly superior to that of genetic algorithms and is comparable to the best results reported in the literature.

  5. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  6. Minimizing tardiness for job shop scheduling under uncertainties

    OpenAIRE

    Yahouni , Zakaria; Mebarki , Nasser; Sari , Zaki

    2016-01-01

    International audience; —Many disturbances can occur during the execution of a manufacturing scheduling process. To cope with this drawback , flexible solutions are proposed based on the offline and the online phase of the schedule. Groups of permutable operations is one of the most studied flexible scheduling methods bringing flexibility as well as quality to a schedule. The online phase of this method is based on a human-machine system allowing to choose in real-time one schedule from a set...

  7. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  8. Hepatitis B Vaccination Rate Among Medical Students At The ...

    African Journals Online (AJOL)

    TNHJOURNALPH

    KEYWORDS. Hepatitis B, vaccination rate, Medical students; Nigeria. Correspondence: Dr PaulNsirimobul. Email- nsypaul@yahoo.co.uk. INTRODUCTION. The hepatitis B virus .... students of the College of Health Sciences,. University of Port Harcourt .... work schedule in the hospital, procrastination, to long queues at the ...

  9. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) It is the policy of the Board to consider unrealistic scheduling of... to the advertising of scheduled performance, it is the policy of the Board to regard as an unfair or...

  10. A genetic algorithm for preemptive scheduling of a single machine

    Directory of Open Access Journals (Sweden)

    Amir-Mohammad Golmohammadi

    2016-09-01

    Full Text Available This paper presents a mathematical model for scheduling of a single machine when there are preemptions in jobs. The primary objective of the study is to minimize different objectives such as earliness, tardiness and work in process. The proposed mathematical problem is considered as NP-Hard and the optimal solution is available for small scale problems. Therefore, a genetic algorithm (GA is developed to solve the problem for large-scale problems. The implementation of the proposed model is compared with GA for problems with up to 50 jobs using three methods of roulette wheel sampling, random sampling and competition sampling. The results have indicated that competition sampling has reached optimal solutions for small scale problems and it could obtain better near-optimal solutions in relatively lower running time compared with other sampling methods.

  11. LEARNING SCHEDULER PARAMETERS FOR ADAPTIVE PREEMPTION

    OpenAIRE

    Prakhar Ojha; Siddhartha R Thota; Vani M; Mohit P Tahilianni

    2015-01-01

    An operating system scheduler is expected to not allow processor stay idle if there is any process ready or waiting for its execution. This problem gains more importance as the numbers of processes always outnumber the processors by large margins. It is in this regard that schedulers are provided with the ability to preempt a running process, by following any scheduling algorithm, and give us an illusion of simultaneous running of several processes. A process which is allowed t...

  12. Topology-based hierarchical scheduling using deficit round robin

    DEFF Research Database (Denmark)

    Yu, Hao; Yan, Ying; Berger, Michael Stubert

    2009-01-01

    according to the topology. The mapping process could be completed through the network management plane or by manual configuration. Based on the knowledge of the network, the scheduler can manage the traffic on behalf of other less advanced nodes, avoid potential traffic congestion, and provide flow...... protection and isolation. Comparisons between hierarchical scheduling, flow-based scheduling, and class-based scheduling schemes have been carried out under a symmetric tree topology. Results have shown that the hierarchical scheduling scheme provides better flow protection and isolation from attack...

  13. 33 CFR 401.58 - Pleasure craft scheduling.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pleasure craft scheduling. 401.58... OF TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.58 Pleasure craft scheduling. (a) The transit of pleasure craft shall be scheduled by the traffic controller or the officer in...

  14. Spike: Artificial intelligence scheduling for Hubble space telescope

    Science.gov (United States)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  15. Psychometric properties of the Positive and Negative Affect Schedule (PANAS) in a heterogeneous sample of substance users.

    Science.gov (United States)

    Serafini, Kelly; Malin-Mayor, Bo; Nich, Charla; Hunkele, Karen; Carroll, Kathleen M

    2016-03-01

    The Positive and Negative Affect Schedule (PANAS) is a widely used measure of affect. A comprehensive psychometric evaluation among substance users, however, has not been published. To examine the psychometric properties of the PANAS in a sample of outpatient treatment substance users. We used pooled data from four randomized clinical trials (N = 416; 34% female, 48% African American). A confirmatory factor analysis indicated adequate support for a two-factor correlated model comprised of Positive Affect and Negative Affect with correlated item errors (Comparative Fit Index = 0.93, Root Mean Square Error of Approximation = 0.07, χ(2) = 478.93, df = 156). Cronbach's α indicated excellent internal consistency for both factors (0.90 and 0.91, respectively). The PANAS factors had good convergence and discriminability (Composite Reliability > 0.7; Maximum Shared Variance Positive Affect = 0.80, Negative Affect = 0.76). Concurrent and discriminant validity were demonstrated with correlations with the Brief Symptom Inventory and Addiction Severity Index. The PANAS scores were also significantly correlated with treatment outcomes (e.g. Positive Affect was associated with the maximum days of consecutive abstinence from primary substance of abuse, r = 0.16, p = 0.001). Our data suggest that the psychometric properties of the PANAS are retained in substance using populations. Although several studies have focused on the role of Negative Affect, our findings suggest that Positive Affect may also be an important factor in substance use treatment outcomes.

  16. Step-by-step cyclic processes scheduling

    DEFF Research Database (Denmark)

    Bocewicz, G.; Nielsen, Izabela Ewa; Banaszak, Z.

    2013-01-01

    Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research is to pro......Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research...... is to provide a declarative model enabling to state a constraint satisfaction problem aimed at AGVs fleet scheduling subject to assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS’s material handling and production routes of simultaneously manufactured...... orders, the main objective is to provide the declarative framework aimed at conditions allowing one to calculate the AGVs fleet schedule in online mode. An illustrative example of the relevant algebra-like driven step-by-stem cyclic scheduling is provided....

  17. College Student Samples Are Not Always Equivalent: The Magnitude of Personality Differences Across Colleges and Universities.

    Science.gov (United States)

    Corker, Katherine S; Donnellan, M Brent; Kim, Su Yeong; Schwartz, Seth J; Zamboanga, Byron L

    2017-04-01

    This research examined the magnitude of personality differences across different colleges and universities to understand (a) how much students at different colleges vary from one another and (b) whether there are site-level variables that can explain observed differences. Nearly 8,600 students at 30 colleges and universities completed a Big Five personality trait measure. Site-level information was obtained from the Integrated Postsecondary Education System database (U.S. Department of Education). Multilevel models revealed that each of the Big Five traits showed significant between-site variability, even after accounting for individual-level demographic differences. Some site-level variables (e.g., enrollment size, requiring letters of recommendation) explained between-site differences in traits, but many tests were not statistically significant. Student samples at different universities differed in terms of average levels of Big Five personality domains. This raises the possibility that personality differences may explain differences in research results obtained when studying students at different colleges and universities. Furthermore, results suggest that research that compares findings for only a few sites (e.g., much cross-cultural research) runs the risk of overgeneralizing differences between specific samples to broader group differences. These results underscore the value of multisite collaborative research efforts to enhance psychological research. © 2015 Wiley Periodicals, Inc.

  18. [Symptoms of social phobia and their relationship to interpersonal characteristics in a sample of German medical students].

    Science.gov (United States)

    Baldauf, Matthias; Thomas, Andrea; Strauß, Bernhard

    2014-02-01

    The study aimed to detect the frequency of social phobia symptoms in a sample of German medical students and to compare students with and without these symptoms related to interpersonal characteristics. 525 students filled out a battery of self-report questionnaires consisting of the LSAS (Liebowitz Social Anxiety Scale), the SPAI (Social Phobia Anxiety Inventory), the IIP-32 (Inventar of interpersonal problems) and the IIM (Inventar of interpersonal motives). Relevant social phobia symptoms were found in 12.2%. Students with symptoms of social phobia differed significantly in subscales of the IIP and the IIM. Students with symptoms of social phobia also had higher scores for interpersonal problems especially related to the main issue of being too "socially avoidant". © Georg Thieme Verlag KG Stuttgart · New York.

  19. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    visibility, sky background, required time sampling coverage) and the dynamic change of the system conditions (i.e., weather, system conditions). Off-line and on-line strategies are integrated into a single tool for a suitable transfer of the target prioritization made by the science team to the real-time schedule that will be used by the instrument operators. A suitable solution will be expected to increase the efficiency of telescope operations, which will represent an important benefit in terms of scientific return and operational costs. We present the operational scheduling tool designed for CARMENES, which is based on two algorithms combining a global and a local search: Genetic Algorithms and Hill Climbing astronomy-based heuristics, respectively. The algorithm explores a large amount of potential solutions from the vast search space and is able to identify the most efficient ones. A planning solution is considered efficient when it optimizes the objectives defined, which, in our case, are related to the reduction of the time that the telescope is not in use and the maximization of the scientific return, measured in terms of the time coverage of each target in the survey. We present the results obtained using different test cases.

  20. Parents' nonstandard work schedules and child well-being: a critical review of the literature.

    Science.gov (United States)

    Li, Jianghong; Johnson, Sarah E; Han, Wen-Jui; Andrews, Sonia; Kendall, Garth; Strazdins, Lyndall; Dockery, Alfred

    2014-02-01

    This paper provides a comprehensive review of empirical evidence linking parental nonstandard work schedules to four main child developmental outcomes: internalizing and externalizing problems, cognitive development, and body mass index. We evaluated the studies based on theory and methodological rigor (longitudinal data, representative samples, consideration of selection and information bias, confounders, moderators, and mediators). Of 23 studies published between 1980 and 2012 that met the selection criteria, 21 reported significant associations between nonstandard work schedules and an adverse child developmental outcome. The associations were partially mediated through parental depressive symptoms, low quality parenting, reduced parent-child interaction and closeness, and a less supportive home environment. These associations were more pronounced in disadvantaged families and when parents worked such schedules full time. We discuss the nuance, strengths, and limitations of the existing studies, and propose recommendations for future research.

  1. Decay-usage scheduling in multiprocessors

    NARCIS (Netherlands)

    Epema, D.H.J.

    1998-01-01

    Decay-usage scheduling is a priority-aging time-sharing scheduling policy capable of dealing with a workload of both interactive and batch jobs by decreasing the priority of a job when it acquires CPU time, and by increasing its priority when it does not use the (a) CPU. In this article we deal with

  2. Quasi-Experimental Evaluation of a Student Mentoring Program

    OpenAIRE

    Sandner, Malte

    2013-01-01

    This paper presents evidence from a natural-experiment which evaluates the effectiveness of a student mentoring program. The mentoring includes several compulsory, scheduled, faceto- face appointments between a mentor and a student in the first study year. All mentors are graduated and employed by the institution. For the evaluation, I use the fact that the mentoring is only offered to students in an economics and management program, whereas it is not offered to students in an industrial engi...

  3. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  4. Nonblocking Scheduling for Web Service Transactions

    DEFF Research Database (Denmark)

    Alrifai, Mohammad; Balke, Wolf-Tilo; Dolog, Peter

    2007-01-01

    . In this paper, we propose a novel nonblocking scheduling mechanism that is used prior to the actual service invocations. Its aim is to reach an agreement between the client and all participating providers on what transaction processing times have to be expected, accepted, and guaranteed. This enables service......For improved flexibility and concurrent usage existing transaction management models for Web services relax the isolation property of Web service-based transactions. Correctness of the concurrent execution then has to be ensured by commit order-preserving transaction schedulers. However, local...... schedulers of service providers typically do take into account neither time constraints for committing the whole transaction, nor the individual services' constraints when scheduling decisions are made. This often leads to an unnecessary blocking of transactions by (possibly long-running) others...

  5. Sample Selectivity and the Validity of International Student Achievement Tests in Economic Research. NBER Working Paper No. 15867

    Science.gov (United States)

    Hanushek, Eric A.; Woessmann, Ludger

    2010-01-01

    Critics of international student comparisons argue that results may be influenced by differences in the extent to which countries adequately sample their entire student populations. In this research note, we show that larger exclusion and non-response rates are related to better country average scores on international tests, as are larger…

  6. [The relationship among depression, anxiety, and somatic symptoms in a sample of university students in northern Mexico].

    Science.gov (United States)

    González Ramírez, Mónica Teresa; Landero Hernández, René; García-Campayo, Javier

    2009-02-01

    To determine how anxiety, depression, and somatic symptoms are related in a sample of university students in northern Mexico. An exploratory study was conducted through self-administered questionnaires applied to a convenience sample of 506 psychology students at two universities in Monterrey, in the state of Nuevo León, Mexico. To evaluate somatic symptoms, the Patient Health Questionnaire was used; for depression, the Beck Depression Inventory; and for anxiety, the Social Anxiety Scale for Adolescents. Spearman's correlation was used to determine to what extent the associations among the variables were significant. The Kruskal-Wallis test was used to compare anxiety and depression levels between groups of students organized by severity of somatic symptoms. Of the participants, 129 (25.5%) presented somatic symptoms that were of medium intensity or severe; just 4 (0.8%) had severe depression; and only 2 (0.4%) students presented anxiety levels over 75% of the scale maximum. The severity of somatic symptoms increased in step with anxiety and depression levels. The somatic symptoms occurring most frequently and of greatest concern among the study sample were: headache, menstrual pain, and backache, as well as feeling tired and having difficulty sleeping. The direct association between the severity of somatic symptoms and depression and anxiety was confirmed. It is recommended that all treatment and/or prevention programs addressing one of these conditions, include the other two as well. Programs specifically aimed at university youth should be implemented.

  7. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  8. Toward an Autonomous Telescope Network: the TBT Scheduler

    Science.gov (United States)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  9. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  10. Associations among perceptual anomalies, social anxiety, and paranoia in a college student sample.

    Science.gov (United States)

    Tone, Erin B; Goulding, Sandra M; Compton, Michael T

    2011-07-30

    Recent evidence suggests that normal-range paranoid ideation may be particularly likely to develop in individuals disposed to both social anxiety and perceptual anomalies. This study was designed to test the hypothesis that among college students in an unselected sample, social anxiety and experience of perceptual anomalies would not only each independently predict the experience of self-reported paranoid ideation, but would also interact to predict paranoid patterns of thought. A diverse sample of 644 students completed a large battery of self-report measures, as well as the five-factor Paranoia/Suspiciousness Questionnaire (PSQ). We conducted hierarchical multiple regression analyses predicting scores on each PSQ factor from responses on measures of social anxiety, perceptual aberration, and the interaction between the two constructs. Current general negative affect was covaried in all analyses. We found that both social anxiety and perceptual aberrations, along with negative affect, predicted multiple dimensions of paranoia as measured by the PSQ; the two constructs did not, however, interact significantly to predict any dimensions. Our findings suggest that perceptual aberration and anxiety may contribute to normal-range paranoid ideation in an additive rather than an interactive manner. Copyright © 2011 Elsevier Ltd. All rights reserved.

  11. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  12. Study habits among Nigerian secondary school students with brain fag syndrome

    Directory of Open Access Journals (Sweden)

    Olufemi Morakinyo

    2010-01-01

    Full Text Available Brain Fag Syndrome (BFS is a psychiatric disorder associated with study affecting two to four out of every ten African students. One of the consequences of this illness is early foreclosure of education in affected students. Etiological factors such as nervous predisposition, motivation for achievement, and psycho-stimulant use have been found associated with it. However, the contributions of study habits to the pathogenesis of this study-related illness deserve more attention than has been given. We carried out this cross-sectional study to ascertain the types of study habits associated with BFS among a sample of senior secondary school students in Ile-Ife, Nigeria. Five hundred students from six schools in Ile-Ife were selected using a stratified random sampling technique. The selected students completed the Socio-demographic Data Schedule, the Brain Fag Syndrome Scale, and Bakare’s Study Habit Inventory. The prevalence of BFS was 40.2% (201. There were no significant socio-demographic variables identifying BFS students apart from those without BFS. The significant measures of study habits that predicted BFS were homework and assignments, examinations, and written work. Those with BFS had 3.58 times the odds to perform poorly on homework and assignments, 3.27 times the odds to perform poorly on examinations, and 1.01 times the odds to perform poorly on written work compared to those without BFS. We concluded that the results of this study suggest that homework and assignments, examinations, and written work were significant study habit variables associated with BFS.

  13. Cloud Service Scheduling Algorithm Research and Optimization

    Directory of Open Access Journals (Sweden)

    Hongyan Cui

    2017-01-01

    Full Text Available We propose a cloud service scheduling model that is referred to as the Task Scheduling System (TSS. In the user module, the process time of each task is in accordance with a general distribution. In the task scheduling module, we take a weighted sum of makespan and flowtime as the objective function and use an Ant Colony Optimization (ACO and a Genetic Algorithm (GA to solve the problem of cloud task scheduling. Simulation results show that the convergence speed and output performance of our Genetic Algorithm-Chaos Ant Colony Optimization (GA-CACO are optimal.

  14. A Gas Scheduling Optimization Model for Steel Enterprises

    Directory of Open Access Journals (Sweden)

    Niu Honghai

    2017-01-01

    Full Text Available Regarding the scheduling problems of steel enterprises, this research designs the gas scheduling optimization model according to the rules and priorities. Considering different features and the process changes of the gas unit in the process of actual production, the calculation model of process state and gas consumption soft measurement together with the rules of scheduling optimization is proposed to provide the dispatchers with real-time gas using status of each process, then help them to timely schedule and reduce the gas volume fluctuations. In the meantime, operation forewarning and alarm functions are provided to avoid the abnormal situation in the scheduling, which has brought about very good application effect in the actual scheduling and ensures the safety of the gas pipe network system and the production stability.

  15. A reduced feedback proportional fair multiuser scheduling scheme

    KAUST Repository

    Shaqfeh, Mohammad

    2011-12-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed and ordered scheduling mechanism. A slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we propose a novel proportional fair multiuser switched-diversity scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the per-user feedback thresholds. We demonstrate by numerical examples that our reduced feedback proportional fair scheduler operates within 0.3 bits/sec/Hz from the achievable rates by the conventional full feedback proportional fair scheduler in Rayleigh fading conditions. © 2011 IEEE.

  16. Where do we stand with fuzzy project scheduling?

    CERN Document Server

    Bonnal, Pierre; Lacoste, Germain

    2004-01-01

    Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project- scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.

  17. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  18. Job schedulers for Big data processing in Hadoop environment: testing real-life schedulers using benchmark programs

    Directory of Open Access Journals (Sweden)

    Mohd Usama

    2017-11-01

    Full Text Available At present, big data is very popular, because it has proved to be much successful in many fields such as social media, E-commerce transactions, etc. Big data describes the tools and technologies needed to capture, manage, store, distribute, and analyze petabyte or larger-sized datasets having different structures with high speed. Big data can be structured, unstructured, or semi structured. Hadoop is an open source framework that is used to process large amounts of data in an inexpensive and efficient way, and job scheduling is a key factor for achieving high performance in big data processing. This paper gives an overview of big data and highlights the problems and challenges in big data. It then highlights Hadoop Distributed File System (HDFS, Hadoop MapReduce, and various parameters that affect the performance of job scheduling algorithms in big data such as Job Tracker, Task Tracker, Name Node, Data Node, etc. The primary purpose of this paper is to present a comparative study of job scheduling algorithms along with their experimental results in Hadoop environment. In addition, this paper describes the advantages, disadvantages, features, and drawbacks of various Hadoop job schedulers such as FIFO, Fair, capacity, Deadline Constraints, Delay, LATE, Resource Aware, etc, and provides a comparative study among these schedulers.

  19. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  20. Scheduling algorithms for rapid imaging using agile Cubesat constellations

    Science.gov (United States)

    Nag, Sreeja; Li, Alan S.; Merrick, James H.

    2018-02-01

    Distributed Space Missions such as formation flight and constellations, are being recognized as important Earth Observation solutions to increase measurement samples over space and time. Cubesats are increasing in size (27U, ∼40 kg in development) with increasing capabilities to host imager payloads. Given the precise attitude control systems emerging in the commercial market, Cubesats now have the ability to slew and capture images within short notice. We propose a modular framework that combines orbital mechanics, attitude control and scheduling optimization to plan the time-varying, full-body orientation of agile Cubesats in a constellation such that they maximize the number of observed images and observation time, within the constraints of Cubesat hardware specifications. The attitude control strategy combines bang-bang and PD control, with constraints such as power consumption, response time, and stability factored into the optimality computations and a possible extension to PID control to account for disturbances. Schedule optimization is performed using dynamic programming with two levels of heuristics, verified and improved upon using mixed integer linear programming. The automated scheduler is expected to run on ground station resources and the resultant schedules uplinked to the satellites for execution, however it can be adapted for onboard scheduling, contingent on Cubesat hardware and software upgrades. The framework is generalizable over small steerable spacecraft, sensor specifications, imaging objectives and regions of interest, and is demonstrated using multiple 20 kg satellites in Low Earth Orbit for two case studies - rapid imaging of Landsat's land and coastal images and extended imaging of global, warm water coral reefs. The proposed algorithm captures up to 161% more Landsat images than nadir-pointing sensors with the same field of view, on a 2-satellite constellation over a 12-h simulation. Integer programming was able to verify that

  1. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  2. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  3. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  4. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  5. Scheduling job shop - A case study

    Science.gov (United States)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  6. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  7. Sleep debt and depression in female college students.

    Science.gov (United States)

    Regestein, Quentin; Natarajan, Viji; Pavlova, Milena; Kawasaki, Susan; Gleason, Ray; Koff, Elissa

    2010-03-30

    The objective of the study was to evaluate relationships between sleep habits and depressive symptoms. Pilot study data were collected about sleep schedules, related factors and depression in female college students to find whether their sleep schedules correlate with affective symptoms. In the subsequent main study, similar information was collected under more controlled conditions. Depression was measured using the CES-D (Center for Epidemiologic Studies Depression Scale) and HAM-D-3 (modified Hamilton Depression Rating Scale). Response rates were 31.3% of eligible students for the pilot survey and 71.6% for the main study. Both studies showed that about 20% of students reported weekday sleep debts of greater than 2 h and about 28% reported significantly greater sleep debt and had significantly higher depression scores (Pstudents. Melancholic symptoms indicated by high CES-D scores (>24), were observed in 24% of students. Sleep problems explained 13% of the variance for both the CESD scale and the HAM-D-3 scale. Among female college students, those who report a sleep debt of at least 2 h or significant daytime sleepiness have a higher risk of reporting melancholic symptoms than others. Copyright 2008 Elsevier Ltd. All rights reserved.

  8. Sedative Drug Use among King Saud University Medical Students: A Cross-Sectional Sampling Study

    Directory of Open Access Journals (Sweden)

    Ahmed A. Al-Sayed

    2014-01-01

    Full Text Available Introduction. Medical students experience significant psychological stress and are therefore at higher risk of using sedatives. There are currently no studies describing the prevalence of sedative drug use among medical students in Saudi Arabia. The aim of this study was to evaluate the prevalence and factors associated with sedative drug use among medical students in Saudi Arabia. Materials and Methods. A cross-sectional convenience sampling study gathered data by anonymous questionnaire from students enrolled at the King Saud University College of Medicine in 2011. The questionnaires collected data regarding social and demographic variables, sleep patterns, and the use of stimulant and sedative drugs since enrollment. Sedatives were defined as any pharmaceutical preparations that induce sleep. Results and Discussion. Of the 729 students who returned questionnaires, 17.0% reported sedative drug use at some time since enrollment. Higher academic year, lower grade point average, regular exercise, fewer hours of sleep per day, poorer quality of sleep, and the presence of sleeping disorders were found to be significantly associated with sedative drug use. Conclusions. Further study is required to increase our understanding of sedative drug use patterns in this relatively high-risk group, as such understanding will help in the development of early intervention programs.

  9. Measuring the effects of class scheduling on student success in ...

    African Journals Online (AJOL)

    mostly relying on anecdotal data to support decisions. ... These Information and Communication Technology (ICT) programs were evaluated based on pre- and post-test scores of 74 pre- Advance Placement (pre-AP) chemistry students on the ...

  10. Robust Optimization for Household Load Scheduling with Uncertain Parameters

    Directory of Open Access Journals (Sweden)

    Jidong Wang

    2018-04-01

    Full Text Available Home energy management systems (HEMS face many challenges of uncertainty, which have a great impact on the scheduling of home appliances. To handle the uncertain parameters in the household load scheduling problem, this paper uses a robust optimization method to rebuild the household load scheduling model for home energy management. The model proposed in this paper can provide the complete robust schedules for customers while considering the disturbance of uncertain parameters. The complete robust schedules can not only guarantee the customers’ comfort constraints but also cooperatively schedule the electric devices for cost minimization and load shifting. Moreover, it is available for customers to obtain multiple schedules through setting different robust levels while considering the trade-off between the comfort and economy.

  11. The robust schedule - A link to improved workflow

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    -down the contractors, and force them to rigorously adhere to the initial schedule. If delayed the work-pace or manpower has to be increased to observe the schedule. In attempt to improve productivity three independent site-mangers have been interviewed about time-scheduling. Their experiences and opinions have been...... analyzed and weaknesses in existing time scheduling have been found. The findings showed a negative side effect of keeping the schedule to tight. A too tight schedule is inflexible and cannot absorb variability in production. Flexibility is necessary because of the contractors interacting and dependable....... The result is a chaotic, complex and uncontrolled construction site. Furthermore, strict time limits entail the workflow to be optimized under non-optimal conditions. Even though productivity seems to be increasing, productivity per man-hour is decreasing resulting in increased cost. To increase productivity...

  12. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  13. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  14. Prevalence and Motives for Illicit Use of Prescription Stimulants in an Undergraduate Student Sample.

    Science.gov (United States)

    Teter, Christian J.; McCabe, Sean Esteban; Cranford, James A.; Boyd, Carol J.; Guthrie, Sally K.

    2005-01-01

    To assess the prevalence and motives for illicit use of prescription stimulants and alcohol and other drugs (AODs), associated with these motives, the authors distributed a self-administered Web survey TO a random sample of 9,161 undergraduate college students. Of the study participants, 8.1% reported lifetime and 5.4% reported past-year illicit…

  15. [The improvement of the abilities to maintain motor coordination and equilibrium in the students presenting with the functional disorders of the musculoskeletal system by introducing the elements of therapeutic physical training into the structure of academic schedule of physical education].

    Science.gov (United States)

    Kapilevich, L V; Davlet'yarova, K V; Ovchinnikova, N A

    The problem of deterioration of the health status in the university students at present remains as topical as it was before being a major cause of impaired working capacity, disability and/or poor social adaptation of the large number of graduates. It has been proposed to introduce a class of therapeutic physical training (TPT) into the schedule of physical education for the students. The objective of the present study was to evaluate the effectiveness of the formation of the skills needed to maintain motor coordination and equilibrium in the students presenting with the functional disorders of the musculoskeletal system (MSS) including scoliosis by the introduction of the elements of therapeutic physical training into their academic schedules. The main study group was comprised of 32 students (men) at the age of 18-19 years presenting with the disorders of the musculoskeletal system (type III scoliosis, osteochondropathy, and osteochondrosis). The students of this group received a curriculum aimed at improving their motor skills with the emphasis laid on the selected elements of therapeutic physical training. The control group was composed of 17 students without disorders of the musculoskeletal system who attended the physical education classes following the traditional program. The coordination abilities and balance skills were evaluated based on the analysis with the use of the Stabilan-1 stabilographic apparatus. In addition, the stability test and the Romberg test with open and closed eyes were performed. The results of the study give evidence that the introduction of the elements of therapeutic physical training into the structure of academic schedule of physical education for the students suffering from diseases of the musculoskeletal system has beneficial effect on the parameters of stability and the general ability to maintain the posture and balance. Specifically, in the beginning of the academic year, the students of the main study group presenting with

  16. Integration of a Course Enrolment and Class Timetable Scheduling in a Student Information System

    OpenAIRE

    Vangel V. Ajanovski

    2013-01-01

    This paper is dealing with the most important issues of two of the most significant university administrativeprocesses – the process of term enrolment with course enrolment and the process of organization of classesand scheduling a conflict-free class timetable. In the first part of the paper an introduction to the problemis set and the impact and interrelation of the two processes is explained in detail. In the second part of thepaper, the focus is on the process of class timetable schedulin...

  17. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  18. Associations Among Work and Family Health Climate, Health Behaviors, Work Schedule, and Body Weight.

    Science.gov (United States)

    Buden, Jennifer C; Dugan, Alicia G; Faghri, Pouran D; Huedo-Medina, Tania B; Namazi, Sara; Cherniack, Martin G

    2017-06-01

    Correctional employees exhibit elevated obesity rates. This study examines interrelations among health behaviors, health climate, body mass index (BMI), and work schedule. Using survey results from correctional supervisors (n = 157), mediation and moderated-mediation analyses were performed to examine how health behaviors explain relationships between obesity, work health climate (WHC) and family health climate (FHC), and work schedule. Over 85% of the sample was overweight/obese (mean BMI = 30.20). Higher WHC and FHC were associated with lower BMI, mediated by nutrition, and physical activity. The interaction effect between health behavior and work schedule revealed a protective effect on BMI. Overtime shift work may share a relationship with BMI. Findings may have implications for reexamining organizational policies on maximum weekly overtime in corrections. They provide direction for targeted obesity interventions that encourage a supportive FHC and promote healthy behaviors among supervisors working overtime.

  19. Associations among Work and Family Health Climate, Health Behaviors, Work Schedule and Body Weight

    Science.gov (United States)

    Buden, Jennifer C.; Dugan, Alicia G.; Faghri, Pouran D.; Huedo-Medina, Tania B.; Namazi, Sara; Cherniack, Martin G.

    2017-01-01

    Objectives Correctional employees exhibit elevated obesity rates. This study examines interrelations among health behaviors, health climate, BMI, and work schedule. Methods Using survey results from correctional supervisors (n=157), mediation and moderated-mediation analyses were performed to examine how health behaviors explain relationships between obesity, work health climate (WHC) and family health climate (FHC), and work schedule. Results Over 85% of the sample was overweight/obese (mean BMI=30.20). Higher WHC and FHC were associated with lower BMI, mediated by nutrition and physical activity. The interaction effect between health behavior and work schedule revealed a protective effect on BMI. Overtime shiftwork may share a relationship with BMI. Conclusions Findings may have implications for reexamining organizational policies on maximum weekly overtime in corrections. They provide direction for targeted obesity interventions that encourage a supportive FHC and promote healthy behaviors among supervisors working overtime. PMID:28471768

  20. Operating room scheduling and surgeon assignment problem under surgery durations uncertainty.

    Science.gov (United States)

    Liu, Hongwei; Zhang, Tianyi; Luo, Shuai; Xu, Dan

    2017-12-29

    Scientific management methods are urgently needed to balance the demand and supply of heath care services in Chinese hospitals. Operating theatre is the bottleneck and costliest department. Therefore, the surgery scheduling is crucial to hospital management. To increase the utilization and reduce the cost of operating theatre, and to improve surgeons' satisfaction in the meantime, a practical surgery scheduling which could assign the operating room (OR) and surgeon for the surgery and sequence surgeries in each OR was provided for hospital managers. Surgery durations were predicted by fitting the distributions. A two-step mixed integer programming model considering surgery duration uncertainty was proposed, and sample average approximation (SAA) method was applied to solve the model. Durations of various surgeries were log-normal distributed respectively. Numerical experiments showed the model and method could get good solutions with different sample sizes. Real-life constraints and duration uncertainty were considered in the study, and the model was also very applicable in practice. Average overtime of each OR was reducing and tending to be stable with the number of surgeons increasing, which is a discipline for OR management.

  1. Exploring the hierarchical structure of the MMPI-2-RF Personality Psychopathology Five in psychiatric patient and university student samples.

    Science.gov (United States)

    Bagby, R Michael; Sellbom, Martin; Ayearst, Lindsay E; Chmielewski, Michael S; Anderson, Jaime L; Quilty, Lena C

    2014-01-01

    In this study our goal was to examine the hierarchical structure of personality pathology as conceptualized by Harkness and McNulty's (1994) Personality Psychopathology Five (PSY-5) model, as recently operationalized by the MMPI-2-RF (Ben-Porath & Tellegen, 2011) PSY-5r scales. We used Goldberg's (2006) "bass-ackwards" method to obtain factor structure using PSY-5r item data, successively extracting from 1 to 5 factors in a sample of psychiatric patients (n = 1,000) and a sample of university undergraduate students (n = 1,331). Participants from these samples had completed either the MMPI-2 or the MMPI-2-RF. The results were mostly consistent across the 2 samples, with some differences at the 3-factor level. In the patient sample a factor structure representing 3 broad psychopathology domains (internalizing, externalizing, and psychoticism) emerged; in the student sample the 3-factor level represented what is more commonly observed in "normal-range" personality models (negative emotionality, introversion, and disconstraint). At the 5-factor level the basic structure was similar across the 2 samples and represented well the PSY-5r domains.

  2. The relationship of trait emotional intelligence with the Big Five in Croatian and Slovene university student samples

    Directory of Open Access Journals (Sweden)

    Andreja Avsec

    2009-11-01

    Full Text Available The aim of the study was to examine the relationship between trait emotional intelligence (EI and the Big Five factors of personality in two samples of Croatian and Slovenian university students. If EI is to be of significant value, it must measure something unique and distinct from standard personality traits. The Croatian sample consisted of 257 undergraduate students from University of Rijeka and Osijek and in Slovene sample there were 171 undergraduate students from University of Ljubljana. Participants filled out the Emotional Skills and Competences Questionnaire (ESCQ, Takšić, 1998 and the Big Five Inventory (BFI; John, Donahue, & Kentle, 1991. After controlling for nationality and gender, the Big Five explained up to 33% of the variance of EI. For the Perceive and Understand Emotions Scale only openness and extraversion explain important part of the variance; for the Express and Label Emotions Scale extraversion and conscientiousness are important predictors. The Big Five traits are able to explain the highest proportion of the variance in the Manage and Regulate Emotion Scale; neuroticism is the strongest predictor, but extraversion and conscientiousness also predict important part of the variance. Although high, this percentage of explained variance does not put in question the discriminant validity of EI questionnaire.

  3. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  4. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  5. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  6. Ergonomics in dentistry: experiences of the practice by dental students.

    Science.gov (United States)

    Garcia, P P N S; Gottardello, A C A; Wajngarten, D; Presoto, C D; Campos, J A D B

    2017-08-01

    The aim of this study was to qualitatively evaluate the experiences of students enrolled in the last year of dentistry school with ergonomic practice. This is a qualitative, observational and cross-sectional study, with a non-probabilistic sample design. The sample comprised students enrolled in the last year of dentistry in Araraquara-UNESP (n = 29). The data were collected by means of open semi-structured and individual interviews, captured by a digital voice recorder. The students were interviewed in their own university at a time that was previously scheduled, and care was taken to provide a private and welcoming environment to carry out the interviews. A script containing questions related to practices in ergonomics was prepared at the university. Data analysis was carried out using the qualitative-quantitative Collective Subject Discourse technique with the aid of Qualiquantisoft ® software program. It was found that more than half of the students (58.6%) believe that adopting an ergonomic posture is important to prevent future problems, pain and occupational diseases, and 62.1% of the students confirm having difficulties in adopting ergonomic postures due to the types of treatment required and the regions of the mouth being treated. The main reasons stated for the fact that their colleagues do not adopt ergonomic postures are lack of attention, practice and forgetfulness (44.8%) and difficulty in visualising the operatory field or the procedure performed (27.6%). It is possible to conclude that the students interviewed know ergonomic principles and their importance in occupational health. However, they found it difficult to put these principles into practice. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  7. An Analysis on High School Students' Perceptions of Physics Courses in Terms of Gender (A Sample from Turkey)

    Science.gov (United States)

    Baran, Medine

    2016-01-01

    This study was carried out to determine high school students' perceptions of the courses of Physics and the factors influential on their perceptions with respect to gender. The research sample included 154 high school students (F:78; M:76). In the study, as the data collection tool, a structured interview form was used. The data collected in the…

  8. A Comparison of State Assessment Scores between Music and Nonmusic Students

    Science.gov (United States)

    Thornton, Linda

    2013-01-01

    For several years, an emphasis on standardized testing in certain subjects has often resulted in competition for student time and scheduling choices that may not favor music classes. However, a great deal of literature exists to indicate that music students achieve more success than nonmusic students on a variety of academic measures. The purpose…

  9. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  10. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  11. Giving Students Control over Their Learning; from Self-guided Museum Visits and Field Trips to Using Scanning Technology to Link Content to Earth Samples

    Science.gov (United States)

    Kirkby, K. C.; Phipps, M.

    2011-12-01

    While it may seem counterintuitive, sometimes stepping back is one of the more effective pedagogical approaches instructors can make. On museum visits, an instructor's presence fundamentally alters students' experiences and can curtail student learning by limiting questions or discouraging students from exploring their own interests. Students often rely on the instructor and become passive observers, rather than engaged learners. As an alternative to instructor-led visits, self-guided student explorations of museum exhibits proved to be both popular and pedagogically effective. On pre-instruction and post-instruction surveys, these ungraded, self-guided explorations match or exceed the efficacy of traditional graded lab instruction and completely eclipse gains normally achieved by traditional lecture instruction. In addition, these explorations achieve the remarkable goal of integrating undergraduate earth science instruction into students' social lives. Based on the success of the self-guided museum explorations, this fall saw the debut of an attempt to expand this concept to field experiences. A self-guided student field exploration of Saint Anthony Falls focuses on the intersections of geological processes with human history. Students explore the waterfalls' evolution, its early interpretation by 18th and 19th century Dakota and Euro-America societies, and its subsequent social and economic impacts on Upper Midwest societies. Self-guided explorations allow students to explore field settings on their own or with friends and family in a more relaxed manner. At the same time, these explorations give students control over, and responsibility for, their own learning - a powerful pedagogical approach. Student control over their learning is also the goal of an initiative to use scanning technologies, such as linear bar codes, 2D barcodes and radio-frequency identification (RFID), to revolutionize sample identification and study. Scanning technology allows students to

  12. Can smartphones measure momentary quality of life and participation? A proof of concept using experience sampling surveys with university students.

    Science.gov (United States)

    Liddle, Jacki; Wishink, Anna; Springfield, Liz; Gustafsson, Louise; Ireland, David; Silburn, Peter

    2017-08-01

    Understanding quality of life and participation is a key aspect of occupational therapy research. The use of smartphones to deliver experience-sampling surveys may provide an accessible way to monitor these outcomes. This study used smartphone-based experience sampling methods (ESM) to investigate factors influencing momentary quality of life (mQOL) of university students. A convenience sample of students at an Australian university participated. Using a custom smartphone application, ESM surveys were sent six to eight times, every second day, over a week. Participants indicated their mQOL, occupational participation, occupational enjoyment, social context and location via surveys and provided demographic and health information in a single self-report questionnaire. The relationship between mQOL and variables was analysed at the survey level using logistic regression. Forty students completed 391 surveys. Higher mQOL was significantly related to participation in productive occupations (z = 3.48; P = 0.001), moderate (z = 4.00; P sample, analysing at the individual level, and using ESM in conjunction with other methodologies is recommended. © 2017 Occupational Therapy Australia.

  13. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  14. Know the Risks: Transporting Students in Private Vehicles

    Science.gov (United States)

    Mahoney, Dan

    2011-01-01

    Scheduling off-campus extracurricular activities is not the issue, but how to get students there can present a problem. The transportation of students by staff in their private cars for extracurricular activities is common and occurs chiefly as a matter of convenience or cost saving. But it is not without risks. In general, the best solution for…

  15. Diverse task scheduling for individualized requirements in cloud manufacturing

    Science.gov (United States)

    Zhou, Longfei; Zhang, Lin; Zhao, Chun; Laili, Yuanjun; Xu, Lida

    2018-03-01

    Cloud manufacturing (CMfg) has emerged as a new manufacturing paradigm that provides ubiquitous, on-demand manufacturing services to customers through network and CMfg platforms. In CMfg system, task scheduling as an important means of finding suitable services for specific manufacturing tasks plays a key role in enhancing the system performance. Customers' requirements in CMfg are highly individualized, which leads to diverse manufacturing tasks in terms of execution flows and users' preferences. We focus on diverse manufacturing tasks and aim to address their scheduling issue in CMfg. First of all, a mathematical model of task scheduling is built based on analysis of the scheduling process in CMfg. To solve this scheduling problem, we propose a scheduling method aiming for diverse tasks, which enables each service demander to obtain desired manufacturing services. The candidate service sets are generated according to subtask directed graphs. An improved genetic algorithm is applied to searching for optimal task scheduling solutions. The effectiveness of the scheduling method proposed is verified by a case study with individualized customers' requirements. The results indicate that the proposed task scheduling method is able to achieve better performance than some usual algorithms such as simulated annealing and pattern search.

  16. Reliability and validity of the Student Perceptions of School Cohesion Scale in a sample of Salvadoran secondary school students

    Directory of Open Access Journals (Sweden)

    Arrivillaga Marcela

    2009-11-01

    Full Text Available Abstract Background Despite a growing body of research from the United States and other industrialized countries on the inverse association between supportive social relationships in the school and youth risk behavior engagement, research on the measurement of supportive school social relationships in Central America is limited. We examined the psychometric properties of the Student Perceptions of School Cohesion (SPSC scale, a 10-item scale that asks students to rate with a 5-point Likert-type response scale their perceptions of the school social environment, in a sample of public secondary school students (mean age = 15 years living in central El Salvador. Methods Students (n = 982 completed a self-administered questionnaire that included the SPSC scale along with measures of youth health risk behaviors based on the Center for Disease Control and Prevention's Youth Risk Behavior Survey. Exploratory factor analysis was used to assess the factor structure of the scale, and two internal consistency estimates of reliability were computed. Construct validity was assessed by examining whether students who reported low school cohesion were significantly more likely to report physical fighting and illicit drug use. Results Results indicated that the SPSC scale has three latent factors, which explained 61.6% of the variance: supportive school relationships, student-school connectedness, and student-teacher connectedness. The full scale and three subscales had good internal consistency (rs = .87 and α = .84 for the full scale; rs and α between .71 and .75 for the three subscales. Significant associations were found between the full scale and all three subscales with physical fighting (p ≤ .001 and illicit drug use (p Conclusion Findings provide evidence of reliability and validity of the SPSC for the measurement of supportive school relationships in Latino adolescents living in El Salvador. These findings provide a foundation for further research on

  17. Crux of Time Management for Students

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 21; Issue 1. Crux of Time Management for Students. Felix Bast. General Article Volume ... Keywords. Bibliography; Cornell method; Eisenhower matrix; events; personal productivity; Pomodoro technique; procrastination; scheduling; SQ3R method; tasks.

  18. Schedules of controlled substances: temporary placement of three synthetic cannabinoids into Schedule I. Final order.

    Science.gov (United States)

    2013-05-16

    The Deputy Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to temporarily schedule three synthetic cannabinoids under the Controlled Substances Act (CSA) pursuant to the temporary scheduling provisions of 21 U.S.C. 811(h). The substances are (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48). This action is based on a finding by the Deputy Administrator that the placement of these synthetic cannabinoids and their salts, isomers and salts of isomers into Schedule I of the CSA is necessary to avoid an imminent hazard to the public safety. As a result of this order, the full effect of the CSA and the Controlled Substances Import and Export Act (CSIEA) and their implementing regulations including criminal, civil and administrative penalties, sanctions and regulatory controls of Schedule I substances will be imposed on the manufacture, distribution, possession, importation, and exportation of these synthetic cannabinoids.

  19. Interoceanic canal excavation scheduling via computer simulation

    Energy Technology Data Exchange (ETDEWEB)

    Baldonado, Orlino C [Holmes and Narver, Inc., Los Angeles, CA (United States)

    1970-05-15

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  20. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  1. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... domestic law and international conventions and agreements adopted by the United States; such terminal... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  2. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  3. UMTRA project water sampling and analysis plan, Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-04-01

    Surface remedial action is scheduled to begin at the Naturita UMTRA Project processing site in the spring of 1994. No water sampling was performed during 1993 at either the Naturita processing site (NAT-01) or the Dry Flats disposal site (NAT-12). Results of previous water sampling at the Naturita processing site indicate that ground water in the alluvium is contaminated as a result of uranium processing activities. Baseline ground water conditions have been established in the uppermost aquifer at the Dry Flats disposal site. Water sampling activities scheduled for April 1994 include preconstruction sampling of selected monitor wells at the processing site, surface water sampling of the San Miguel River, sampling of several springs/seeps in the vicinity of the disposal site, and sampling of two monitor wells in Coke Oven Valley. The monitor well locations provide sampling points to characterize ground water quality and flow conditions in the vicinity of the sites. The list of analytes has been updated to reflect constituents related to uranium processing activities and the parameters needed for geochemical evaluation. Water sampling will be conducted annually at minimum during the period of construction activities

  4. Solving project scheduling problems by minimum cut computations

    NARCIS (Netherlands)

    Möhring, R.H.; Schulz, A.S.; Stork, F.; Uetz, Marc Jochen

    In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a given objective. In resource-constrained project scheduling, the jobs additionally compete for scarce resources. Due to its universality, the latter problem has a variety of applications in

  5. Relation between Assertiveness, Academic Self-Efficacy, and Psychosocial Adjustment among International Graduate Students.

    Science.gov (United States)

    Poyrazli, Senel; Arbona, Consuelo; Nora, Amaury; McPherson, Robert; Pisecco, Stewart

    2002-01-01

    Rathus Assertiveness Schedule, Academic Self-Efficacy Scale, The Inventory for Student Adjustment Strain, and UCLA Loneliness Scale were used to examine a total of 122 graduate international students. Findings indicate that English proficiency, assertiveness, and academic self-efficacy contributed uniquely to the variance in students' general…

  6. A Longitudinal Study of Financial Difficulties and Mental Health in a National Sample of British Undergraduate Students.

    Science.gov (United States)

    Richardson, Thomas; Elliott, Peter; Roberts, Ron; Jansen, Megan

    2017-04-01

    Previous research has shown a relationship between financial difficulties and poor mental health in students, but most research is cross-sectional. To examine longitudinal relationships over time between financial variables and mental health in students. A national sample of 454 first year British undergraduate students completed measures of mental health and financial variables at up to four time points across a year. Cross-sectional relationships were found between poorer mental health and female gender, having a disability and non-white ethnicity. Greater financial difficulties predicted greater depression and stress cross-sectionally, and also predicted poorer anxiety, global mental health and alcohol dependence over time. Depression worsened over time for those who had considered abandoning studies or not coming to university for financial reasons, and there were effects for how students viewed their student loan. Anxiety and alcohol dependence also predicted worsening financial situation suggesting a bi-directional relationship. Financial difficulties appear to lead to poor mental health in students with the possibility of a vicious cycle occurring.

  7. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  8. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicle driving schedules

    International Nuclear Information System (INIS)

    Cardoso, G.; Stadler, M.; Bozchalui, M.C.; Sharma, R.; Marnay, C.; Barbosa-Póvoa, A.; Ferrão, P.

    2014-01-01

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem. - Highlights: • This paper introduces a new EV aggregator model in the DER-CAM model and expands it with a stochastic formulation. • The model is used to analyze the impact of EVs in DER investment decisions in a large office building. • The uncertainty in EV driving patterns is considered through scenarios based on data from a daily commute driving survey. • Results indicate that EVs have a significant impact in optimal DER decisions, particularly when looking at short payback periods. • Furthermore, results indicate that uncertainty in EV driving schedules has little impact on DER investment decisions

  9. Designing of vague logic based multilevel feedback queue scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-03-01

    Full Text Available Multilevel feedback queue scheduler suffers from major issues of scheduling such as starvation for long tasks, fixed number of queues, and static length of time quantum in each queue. These factors directly affect the performance of the scheduler. At many times impreciseness exists in attributes of tasks which make the performance even worse. In this paper, our intent is to improve the performance by providing a solution to these issues. We design a multilevel feedback queue scheduler using a vague set which we call as VMLFQ scheduler. VMLFQ scheduler intelligently handles the impreciseness and defines the optimum number of queues as well as the optimal size of time quantum for each queue. It also resolves the problem of starvation. This paper simulates and analyzes the performance of VMLFQ scheduler with the other multilevel feedback queue techniques using MatLab.

  10. How to Better Engage Online Students with Online Strategies

    Science.gov (United States)

    Britt, Margaret

    2015-01-01

    Online education is growing at a phenomenal rate. This growth in online education offers many opportunities to colleges and universities to reach students who may not have attended a traditional (brick and mortar) college or university. Online education also gives students more control over their education along with a more flexible schedule. As…

  11. Predictors of physical activity and barriers to exercise in nursing and medical students.

    Science.gov (United States)

    Blake, Holly; Stanulewicz, Natalia; Mcgill, Francesca

    2017-04-01

    To investigate physical activity levels of nursing and medicine students, examine predictors of physical activity level and examine the most influential benefits and barriers to exercise. Healthcare professionals have low levels of physical activity, which increases their health risk and may influence their health promotion practices with patients. We surveyed 361 nursing (n = 193) and medicine (n = 168) students studying at a UK medical school. Questionnaire survey, active over 12 months in 2014-2015. Measures included physical activity level, benefits and barriers to exercise, social support, perceived stress and self-efficacy for exercise. Many nursing and medicine students did not achieve recommended levels of physical activity (nursing 48%; medicine 38%). Perceived benefits of exercise were health related, with medicine students identifying additional benefits for stress relief. Most notable barriers to exercise were as follows: lack of time, facilities having inconvenient schedules and exercise not fitting around study or placement schedules. Nursing students were less active than medicine students; they perceived fewer benefits and more barriers to exercise and reported lower social support for exercise. Physical activity of nursing and medicine students was best predicted by self-efficacy and social support, explaining 35% of the variance. Physical activity should be promoted in nursing and medicine students. Interventions should aim to build self-efficacy for exercise and increase social support. Interventions should be developed that are targeted specifically to shift-working frontline care staff, to reduce schedule-related barriers to exercise and to increase accessibility to workplace health and well-being initiatives. © 2016 John Wiley & Sons Ltd.

  12. 76 FR 28194 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2011-05-16

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  13. 75 FR 27228 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2010-05-14

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  14. A decentralized scheduling algorithm for time synchronized channel hopping

    Directory of Open Access Journals (Sweden)

    Andrew Tinka

    2011-09-01

    Full Text Available Time Synchronized Channel Hopping (TSCH is an existing Medium Access Control scheme which enables robust communication through channel hopping and high data rates through synchronization. It is based on a time-slotted architecture, and its correct functioning depends on a schedule which is typically computed by a central node. This paper presents, to our knowledge, the first scheduling algorithm for TSCH networks which both is distributed and which copes with mobile nodes. Two variations on scheduling algorithms are presented. Aloha-based scheduling allocates one channel for broadcasting advertisements for new neighbors. Reservation- based scheduling augments Aloha-based scheduling with a dedicated timeslot for targeted advertisements based on gossip information. A mobile ad hoc motorized sensor network with frequent connectivity changes is studied, and the performance of the two proposed algorithms is assessed. This performance analysis uses both simulation results and the results of a field deployment of floating wireless sensors in an estuarial canal environment. Reservation-based scheduling performs significantly better than Aloha-based scheduling, suggesting that the improved network reactivity is worth the increased algorithmic complexity and resource consumption.

  15. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  16. Trustable Virtual Machine Scheduling in a Cloud

    OpenAIRE

    Hermenier , Fabien; Henrio , Ludovic

    2017-01-01

    International audience; In an Infrastructure As A Service (IaaS) cloud, the scheduler deploys VMs to servers according to service level objectives (SLOs). Clients and service providers must both trust the infrastructure. In particular they must be sure that the VM scheduler takes decisions that are consistent with its advertised behaviour. The difficulties to master every theoretical and practical aspects of a VM scheduler implementation leads however to faulty behaviours that break SLOs and ...

  17. Management of Temporal Constraints for Factory Scheduling.

    Science.gov (United States)

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  18. 7 CFR 305.23 - Steam sterilization treatment schedules.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Steam sterilization treatment schedules. 305.23... Steam sterilization treatment schedules. Treatment schedule Temperature( °F) Pressure Exposure period (minutes) Directions T303-b-1 10 lbs 20 Use 28″ vacuum. Steam sterilization is not practical for treatment...

  19. 77 FR 33980 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2012-06-08

    ... 1703 Proposed FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice... the Board's proposed FOIA Fee Schedule Update published in the Federal Register of June 1, 2012. The...: The FOIA requires each Federal agency covered by the Act to specify a schedule of fees applicable to...

  20. Socializing Agents for Sport and Physical Activities in Teenage Students: Comparative Studies in Samples From Costa Rica, Mexico, and Spain.

    Science.gov (United States)

    Ruiz-Juan, Francisco; Baena-Extremera, Antonio; Granero-Gallegos, Antonio

    2017-01-01

    The aim of this study is to analyze a set of socializing agents for sport and physical activities and to establish their relationship with leisure time sport and physical activities behaviors and practice patterns in samples of teenage students with different sociocultural backgrounds. The sample included 2168 students in their first year of secondary education, 423 of them being from Costa Rica, 408 from Mexico, and 1337 from Spain (1052 male students, 1037 female students, and 79 students who did not specify gender) aged 11-16 years old ( M = 12.49; SD = .81). A validated questionnaire with questions about leisure time sport and physical activities and socializing agents was used. Descriptive, inferential, and multinomial logistic regression analyses were carried out with SPSS 17.0 to compare all three countries. Costa Rica had the most active students, best friends' inactivity, and unsupportive parents being the agents predicting inactivity and a low level of sport and physical activities. Mexico has a high dropout rate and inactive students exceed active ones; no agent predicts inactivity or sport and physical activities pattern. Spain has the highest level of sport and physical activities practice, and parents, siblings, and friends are predicting agents of inactivity together with unsupportive parents and friends.

  1. Genetic algorithm to solve the problems of lectures and practicums scheduling

    Science.gov (United States)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.

  2. A dynamic approach to vehicle scheduling

    NARCIS (Netherlands)

    D. Huisman (Dennis); R. Freling (Richard); A.P.M. Wagelmans (Albert)

    2001-01-01

    textabstractThis paper presents a dynamic approach to the vehicle scheduling problem. We discuss the potential benefit of our approach compared to the traditional one, where the vehicle scheduling problem is solved only once for a whole period and the travel times are assumed to be fixed. In our

  3. 21 CFR 1308.13 - Schedule III.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III. 1308.13 Section 1308.13 Food and... opposite it. (b) Stimulants. Unless specifically excepted or unless listed in another schedule, any... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical...

  4. 29 CFR 825.202 - Intermittent leave or reduced leave schedule.

    Science.gov (United States)

    2010-07-01

    ... leave schedule is a leave schedule that reduces an employee's usual number of working hours per workweek, or hours per workday. A reduced leave schedule is a change in the employee's schedule for a period of... 29 Labor 3 2010-07-01 2010-07-01 false Intermittent leave or reduced leave schedule. 825.202...

  5. Examining gray matter structure associated with academic performance in a large sample of Chinese high school students

    OpenAIRE

    Song Wang; Ming Zhou; Taolin Chen; Xun Yang; Guangxiang Chen; Meiyun Wang; Qiyong Gong

    2017-01-01

    Achievement in school is crucial for students to be able to pursue successful careers and lead happy lives in the future. Although many psychological attributes have been found to be associated with academic performance, the neural substrates of academic performance remain largely unknown. Here, we investigated the relationship between brain structure and academic performance in a large sample of high school students via structural magnetic resonance imaging (S-MRI) using voxel-based morphome...

  6. Program Costs and Student Completion

    Science.gov (United States)

    Manning, Terri M.; Crosta, Peter M.

    2014-01-01

    Community colleges are under pressure to increase completion rates, prepare students for the workplace, and contain costs. Colleges need to know the financial implications of what are often perceived as routine decisions: course scheduling, program offerings, and the provision of support services. This chapter presents a methodology for estimating…

  7. Optimal Temporal Decoupling in Task Scheduling with Preferences

    NARCIS (Netherlands)

    Endhoven, L.; Klos, T.B.; Witteveen, C.

    2011-01-01

    Multi-agent planning and scheduling concerns finding a joint plan to achieve some set of common goals with several independent agents each aiming to find a plan or schedule for their part of the goals. To avoid conflicts in these individual plans or schedules decoupling is used. Such a decoupling

  8. Self esteem and assertiveness of final year Turkish university students.

    Science.gov (United States)

    Karagözoğlu, Serife; Kahve, Emine; Koç, Oznur; Adamişoğlu, Derya

    2008-07-01

    This study developed a quantitative methodology to ascertain the level of self esteem and assertiveness of last year students in baccalaureate degree programs at Cumhuriyet University Nursing School, School for Health Sciences' Midwifery School, Education Faculty's Mathematics Teacher, Classroom Teacher, and Social Sciences Teacher programs and to determine if there is a correlation between self esteem and assertiveness. The research population was a total of 372 students who were in their final year of university in these programs. Sampling was not done in the research, the entire population was studied. However there was a total of 82 students who were not included in the research because of illness, absenteeism, registration on hold, who could not be found on campus or who did not want to participate in the research and who did not correctly complete the survey form. The research was conducted with total of 290 students. Total response rate was 77.9%. The data were collected using a "Personal Information Form," Stanley Coopersmith Self Esteem Inventory (SEI) and Rathus Assertiveness Schedule (RAS). Frequency distribution, t test, correlation and variance analysis were used in the analysis of the data. The results of the study were that the nursing students had the highest scores from SEI (80.64+/-15.83). Similarly the nursing students had the highest scores on the RAS (36.29+/-25.33).

  9. Designing of Vague Logic Based 2-Layered Framework for CPU Scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-01-01

    Full Text Available Fuzzy based CPU scheduler has become of great interest by operating system because of its ability to handle imprecise information associated with task. This paper introduces an extension to the fuzzy based round robin scheduler to a Vague Logic Based Round Robin (VBRR scheduler. VBRR scheduler works on 2-layered framework. At the first layer, scheduler has a vague inference system which has the ability to handle the impreciseness of task using vague logic. At the second layer, Vague Logic Based Round Robin (VBRR scheduling algorithm works to schedule the tasks. VBRR scheduler has the learning capability based on which scheduler adapts intelligently an optimum length for time quantum. An optimum time quantum reduces the overhead on scheduler by reducing the unnecessary context switches which lead to improve the overall performance of system. The work is simulated using MATLAB and compared with the conventional round robin scheduler and the other two fuzzy based approaches to CPU scheduler. Given simulation analysis and results prove the effectiveness and efficiency of VBRR scheduler.

  10. Request-Driven Schedule Automation for the Deep Space Network

    Science.gov (United States)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol

    2010-01-01

    The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

  11. The relationship between the FFM personality traits, state psychopathology, and sexual compulsivity in a sample of male college students.

    Science.gov (United States)

    Pinto, Joana; Carvalho, Joana; Nobre, Pedro J

    2013-07-01

    Several studies have advocated a relationship between psychopathological features and sexual compulsivity. Such relationship is often found among individuals seeking help for out of control sexual behavior, suggesting that the association between psychological adjustment and sexual compulsivity may have a significant clinical value. However, a more complete approach to the topic of sexual compulsivity would also include the analysis of nonclinical samples as healthy individuals may be at risk of developing some features of hypersexuality in the future. The aim of this study was to explore the relationship between stable traits of personality, state psychopathology, and sexual compulsivity in a sample of male college students. Furthermore, the potential mediating role of state psychopathology in the relationship between personality traits and sexual compulsivity was tested. Participants completed the following measures: the NEO Five-Factor Inventory, the Brief Symptom Inventory, and the Compulsive Sexual Behavior Inventory-22. The sample included 152 male college students recruited in a Portuguese university using nonrandom methods. The measures were completed individually and anonymously. Findings on state psychopathology suggested that psychoticism may be one of the key dimensions associated with sexual compulsivity in male students. The personality traits of Neuroticism and Agreeableness were also significant predictors of sexual compulsivity. Findings on the mediating effects suggested that state psychopathology mediated the relationship between Neuroticism and sexual compulsivity but not between Agreeableness and sexual compulsivity. A psychopathological path (encompassing Neuroticism and state psychopathology) and a behavioral path (encompassing Agreeableness features) may be involved in sexual compulsivity as reported by a nonclinical sample of male students. © 2013 International Society for Sexual Medicine.

  12. Real-time control systems: feedback, scheduling and robustness

    Science.gov (United States)

    Simon, Daniel; Seuret, Alexandre; Sename, Olivier

    2017-08-01

    The efficient control of real-time distributed systems, where continuous components are governed through digital devices and communication networks, needs a careful examination of the constraints arising from the different involved domains inside co-design approaches. Thanks to the robustness of feedback control, both new control methodologies and slackened real-time scheduling schemes are proposed beyond the frontiers between these traditionally separated fields. A methodology to design robust aperiodic controllers is provided, where the sampling interval is considered as a control variable of the system. Promising experimental results are provided to show the feasibility and robustness of the approach.

  13. [Internet Addiction Disorder in a Sample of 402 High School Students].

    Science.gov (United States)

    Taranto, Francesco; Goracci, Arianna; Bolognesi, Simone; Borghini, Elisa; Fagiolini, Andrea

    2015-01-01

    Internet Addiction Disorder can be defined as "the inability of individuals to control their internet use, resulting in marked distress and/or functional impairment in daily life." It carries the same social aftermath of impulse control and substance misuse disorders such as loss of control, craving and withdrawal symptoms. In this paper, we aimed to assess the prevalence of IAD in an Italian sample of high-school students. We also explored the relationship between Social Phobia and IAD diagnosis; lastly, we investigated the association between IAD and substance misuse. The research was conducted in accordance with the Helsinki Declaration. Assessments administered in this study consisted of three parts: 1) collecting information about general and personal data of the subjects; 2) the Internet Addiction questionnaire proposed by Ko, composed by 9 different areas; 3) the Social Anxiety Spectrum Self-Report (SHY-SR) Lifetime Questionnaire. 19 of 402 subjects (i.e. 4.7% of the sample) fulfilled the diagnostic criteria for IAD, showing a slight predominance of males. 10.9% of subjects met diagnostic criteria for a Social Phobia Spectrum disorder. Six IAD subjects (31.8%) were also diagnosed with a social phobia spectrum condition. Within the group of students diagnosed with IAD, 4 (21.05%) subjects reported current or past use of drugs. Our results suggest that there is a sizable population of youth already showing or at risk of developing some kind of problematic relationship with the web. Social Anxiety Disorder seems to be both a risk factor and a frequent co-morbid disorder of internet misuse. Further studies along with shared diagnostic criteria and tools will facilitate research on treatments for these rapidly expanding and disabling conditions.

  14. PLAN-IT - Scheduling assistant for solar system exploration

    International Nuclear Information System (INIS)

    Dias, W. C.; Henricks, J. A.; Wong, J. C.; California Institute of Technology, Pasadena)

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered. 13 references

  15. Management Matters. Changing to Flexible Scheduling

    Science.gov (United States)

    Pappas, Marjorie L.

    2005-01-01

    Elementary school library media specialists state that one of the most frustrating issues they face is the fixed schedules in their library media centers. Beyond the cost effectiveness issue, the fixed schedule severely limits using the resources of the library media center for inquiry learning and collaborative teaching experiences between the…

  16. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  17. Alcohol, Drugs, and Links to Sexual Risk Behaviors among a Sample of Virginia College Students

    Science.gov (United States)

    Enyeart Smith, Theresa M.; Wessel, Maria T.

    2011-01-01

    This project was significant in that it administered the National College Health Risk Behavior Survey (NCHRBS), a health risk assessment, to a sample of students at three public universities in Virginia. Virginia was never included in the original or subsequent nationwide assessments using this instrument. This health risk assessment is…

  18. Prevalence of Childhood Physical Abuse in a Representative Sample of College Students in Samsun, Turkey

    Science.gov (United States)

    Turla, Ahmet; Dundar, Cihad; Ozkanli, Caglar

    2010-01-01

    The main objective of this article is to obtain the prevalence of childhood physical abuse experiences in college students. This cross-sectional study was performed on a gender-stratified random sample of 988 participants studying at Ondokuz Mayis University, with self-reported anonymous questionnaires. It included questions on physical abuse in…

  19. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  20. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  1. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH.

    Science.gov (United States)

    Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok

    2018-04-16

    Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  2. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  3. Parental work schedules and child overweight and obesity.

    Science.gov (United States)

    Champion, S L; Rumbold, A R; Steele, E J; Giles, L C; Davies, M J; Moore, V M

    2012-04-01

    Studies in school-age children have consistently shown a positive association between maternal paid work hours and child obesity. However, there is conflicting evidence about the impact of maternal work hours scheduled at nonstandard times (for example, evenings, nights or weekends), and no previous examination of paternal work schedules and child weight. We examined the associations between maternal, paternal and combined parental paid work schedules and overweight/obesity in children at age 9 years. Data were analysed from the most recent follow-up of 9-year-old children (n=434) in an Australian birth cohort study. Children were measured and classified as overweight/obese using the International Obesity Taskforce body mass index cutoff points. Current working conditions of parents were obtained from a structured interview with the primary caregiver. Logistic regression analyses were used to investigate the effect of parental work schedules on child overweight/obesity with adjustment for a range of sociodemographic and household factors associated with parental employment and child weight. At 9 years of age, 99 children (22.8%) were overweight or obese. When parental work schedules were examined separately, child overweight/obesity was significantly associated with paternal nonstandard work schedules (adjusted odds ratio (OR) 1.97, 95% confidence interval (CI) 1.08-3.61). There was no association with any type of maternal work schedule. We also found an association between child overweight/obesity and circumstances in which both parents worked nonstandard schedules; however, this was of borderline statistical significance in the adjusted models (adjusted OR 2.26, 95% CI 0.99-5.16). Work hours scheduled at nonstandard times, when worked by the father or both parents, were associated with child overweight and obesity. These findings indicate the potential importance of fathers' paid work arrangements for child overweight/obesity, which until recently has largely

  4. 5 CFR 950.801 - Campaign schedule.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Campaign schedule. 950.801 Section 950... VOLUNTARY ORGANIZATIONS CFC Timetable § 950.801 Campaign schedule. (a) The Combined Federal Campaign will be.../International and International parts of the Charity List to all local campaigns by a date to be determined by...

  5. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  6. An education management information system with simultaneous monitoring of stress stimulators for students Mental Health management.

    Science.gov (United States)

    Manimaran, S; Jayakumar, S; Lakshmi, K Bhagya

    2016-11-14

    Education Management Information System (EMIS) is a widely acceptable and developing technology within the Information Technology field. The advancement in technology in this century is being collaborated with scientific invention or explorer and information strengthening or development. This paper presents the results and experiences gained from applying students oriented EMIS for monitoring and managing mental health. The Mental Health of students depends on the acquiring adequate knowledge on basic concepts within a time period or academic schedule. It's obviously significance to evaluate and appraise the stress stimulators as a challenge or threat. The theoretical framework for the study was designed for analyzing the stress stimulators, academic performance and EMIS accessibility. The sample examined in this study was stratified random sample from 75 students specifically all engineering college in Dindigul District of Tamilnadu. The primary factor is the academic stress stimulators that form one module of EMIS for each of the key variable such as curriculum & instruction related stressors, placement related, teamwork related and assessment related. The Mental Health related stress stimulators namely curriculum & syllabus, placement related, assessment related and team work related have a significant influence on academic performance by students in various institution. The important factor leading to the EMIS application in monitoring stress stimulators is curriculum & syllabus related and assessment related.

  7. Links between Catalan identity and the perception of ethno-linguistic vitality in a sample of university students

    OpenAIRE

    Moisès Esteban; M. Àngels Viladot

    2009-01-01

    This article analyses, on the one hand, the perception of ethno-linguistic vitality in a sample of university students in the province of Girona, and, on the other, links this perceived vitality to the feeling of identity in the group to which they belong. 112 Catalan-speaking students who described themselves as Catalan (Catalan identity) responded to the questionnaire on subjective vitality, in terms of adaptation to Catalan. This instrument assesses the beliefs about one's own group's and ...

  8. Reliability of the Dissociative Trance Disorder Interview Schedule: A preliminary report.

    Science.gov (United States)

    Ross, Colin A; Somer, Eli; Goode, Caitlin

    2018-01-01

    One hundred inpatients in a hospital-based Trauma Program in the USA were interviewed with the Dissociative Trance Disorder Interview Schedule (DTDIS). There were no significant differences for the DTDIS total score or any of the subscale scores on test-retest: all t-values comparing the two administrations of the DTDIS were below 0.7, and all p-values were above 0.5. Cronbach's alpha for the US sample was 0.966 and for the Israeli sample it was 0.971. The findings indicate that the DTDIS has good reliability and may be suitable for use in cross-cultural research; however, the results require replication by independent researchers in a variety of cultures and languages, and in both clinical and nonclinical samples.

  9. Multiple-Machine Scheduling with Learning Effects and Cooperative Games

    Directory of Open Access Journals (Sweden)

    Yiyuan Zhou

    2015-01-01

    Full Text Available Multiple-machine scheduling problems with position-based learning effects are studied in this paper. There is an initial schedule in this scheduling problem. The optimal schedule minimizes the sum of the weighted completion times; the difference between the initial total weighted completion time and the minimal total weighted completion time is the cost savings. A multiple-machine sequencing game is introduced to allocate the cost savings. The game is balanced if the normal processing times of jobs that are on the same machine are equal and an equal number of jobs are scheduled on each machine initially.

  10. Efficient Academic Scheduling at the U.S. Naval Academy

    National Research Council Canada - National Science Library

    Zane, David

    2003-01-01

    This research project examined academic scheduling problems at the U.S. Naval Academy. The focus was on devising methods to construct good final exam schedules and improve existing course schedules by facilitation course changes...

  11. SOFIA's Choice: Automating the Scheduling of Airborne Observations

    Science.gov (United States)

    Frank, Jeremy; Norvig, Peter (Technical Monitor)

    1999-01-01

    This paper describes the problem of scheduling observations for an airborne telescope. Given a set of prioritized observations to choose from, and a wide range of complex constraints governing legitimate choices and orderings, how can we efficiently and effectively create a valid flight plan which supports high priority observations? This problem is quite different from scheduling problems which are routinely solved automatically in industry. For instance, the problem requires making choices which lead to other choices later, and contains many interacting complex constraints over both discrete and continuous variables. Furthermore, new types of constraints may be added as the fundamental problem changes. As a result of these features, this problem cannot be solved by traditional scheduling techniques. The problem resembles other problems in NASA and industry, from observation scheduling for rovers and other science instruments to vehicle routing. The remainder of the paper is organized as follows. In 2 we describe the observatory in order to provide some background. In 3 we describe the problem of scheduling a single flight. In 4 we compare flight planning and other scheduling problems and argue that traditional techniques are not sufficient to solve this problem. We also mention similar complex scheduling problems which may benefit from efforts to solve this problem. In 5 we describe an approach for solving this problem based on research into a similar problem, that of scheduling observations for a space-borne probe. In 6 we discuss extensions of the flight planning problem as well as other problems which are similar to flight planning. In 7 we conclude and discuss future work.

  12. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  13. Developing a discrete event simulation model for university student shuttle buses

    Science.gov (United States)

    Zulkepli, Jafri; Khalid, Ruzelan; Nawawi, Mohd Kamal Mohd; Hamid, Muhammad Hafizan

    2017-11-01

    Providing shuttle buses for university students to attend their classes is crucial, especially when their number is large and the distances between their classes and residential halls are far. These factors, in addition to the non-optimal current bus services, typically require the students to wait longer which eventually opens a space for them to complain. To considerably reduce the waiting time, providing the optimal number of buses to transport them from location to location and the effective route schedules to fulfil the students' demand at relevant time ranges are thus important. The optimal bus number and schedules are to be determined and tested using a flexible decision platform. This paper thus models the current services of student shuttle buses in a university using a Discrete Event Simulation approach. The model can flexibly simulate whatever changes configured to the current system and report its effects to the performance measures. How the model was conceptualized and formulated for future system configurations are the main interest of this paper.

  14. State Teacher Salary Schedules. Policy Analysis

    Science.gov (United States)

    Griffith, Michael

    2016-01-01

    In the United States most teacher compensation issues are decided at the school district level. However, a group of states have chosen to play a role in teacher pay decisions by instituting statewide teacher salary schedules. Education Commission of the States has found that 17 states currently make use of teacher salary schedules. This education…

  15. A Randomized Experiment Testing the Efficacy of a Scheduling Nudge in a Massive Open Online Course (MOOC

    Directory of Open Access Journals (Sweden)

    Rachel Baker

    2016-10-01

    Full Text Available An increasing number of students are taking classes offered online through open-access platforms; however, the vast majority of students who start these classes do not finish. The incongruence of student intentions and subsequent engagement suggests that self-control is a major contributor to this stark lack of persistence. This study presents the results of a large-scale field experiment (N = 18,043 that examines the effects of a self-directed scheduling nudge designed to promote student persistence in a massive open online course. We find that random assignment to treatment had no effects on near-term engagement and weakly significant negative effects on longer-term course engagement, persistence, and performance. Interestingly, these negative effects are highly concentrated in two groups of students: those who registered close to the first day of class and those with .edu e-mail addresses. We consider several explanations for these findings and conclude that theoretically motivated interventions may interact with the diverse motivations of individual students in possibly unintended ways.

  16. Investigating the Relationships Among Resilience, Social Anxiety, and Procrastination in a Sample of College Students.

    Science.gov (United States)

    Ko, Chen-Yi Amy; Chang, Yuhsuan

    2018-01-01

    This study investigated the relationships among resilience, social anxiety, and procrastination in a sample of college students. Specifically, structural equation modeling analyses were applied to examine the effect of resilience on procrastination and to test the mediating effect of social anxiety. The results of this study suggested that social anxiety partially mediated the relationship between resilience and procrastination. Students with higher levels of resilience reported a lower frequency of procrastination behavior, and resilience had an indirect effect on procrastination through social anxiety. The results of this study clarify the current knowledge of the mixed results on resilience and procrastination behaviors and offer practical learning strategies and psychological interventions.

  17. Cost-efficient scheduling of FAST observations

    Science.gov (United States)

    Luo, Qi; Zhao, Laiping; Yu, Ce; Xiao, Jian; Sun, Jizhou; Zhu, Ming; Zhong, Yi

    2018-03-01

    A cost-efficient schedule for the Five-hundred-meter Aperture Spherical radio Telescope (FAST) requires to maximize the number of observable proposals and the overall scientific priority, and minimize the overall slew-cost generated by telescope shifting, while taking into account the constraints including the astronomical objects visibility, user-defined observable times, avoiding Radio Frequency Interference (RFI). In this contribution, first we solve the problem of maximizing the number of observable proposals and scientific priority by modeling it as a Minimum Cost Maximum Flow (MCMF) problem. The optimal schedule can be found by any MCMF solution algorithm. Then, for minimizing the slew-cost of the generated schedule, we devise a maximally-matchable edges detection-based method to reduce the problem size, and propose a backtracking algorithm to find the perfect matching with minimum slew-cost. Experiments on a real dataset from NASA/IPAC Extragalactic Database (NED) show that, the proposed scheduler can increase the usage of available times with high scientific priority and reduce the slew-cost significantly in a very short time.

  18. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  19. Psychometric Properties of the Procrastination Assessment Scale-Student (PASS) in a Student Sample of Sabzevar University of Medical Sciences.

    Science.gov (United States)

    Mortazavi, Forough; Mortazavi, Saideh S; Khosrorad, Razieh

    2015-09-01

    Procrastination is a common behavior which affects different aspects of life. The procrastination assessment scale-student (PASS) evaluates academic procrastination apropos its frequency and reasons. The aims of the present study were to translate, culturally adapt, and validate the Farsi version of the PASS in a sample of Iranian medical students. In this cross-sectional study, the PASS was translated into Farsi through the forward-backward method, and its content validity was thereafter assessed by a panel of 10 experts. The Farsi version of the PASS was subsequently distributed among 423 medical students. The internal reliability of the PASS was assessed using Cronbach's alpha. An exploratory factor analysis (EFA) was conducted on 18 items and then 28 items of the scale to find new models. The construct validity of the scale was assessed using both EFA and confirmatory factor analysis. The predictive validity of the scale was evaluated by calculating the correlation between the academic procrastination scores and the students' average scores in the previous semester. The corresponding reliability of the first and second parts of the scale was 0.781 and 0.861. An EFA on 18 items of the scale found 4 factors which jointly explained 53.2% of variances: The model was marginally acceptable (root mean square error of approximation [RMSEA] =0.098, standardized root mean square residual [SRMR] =0.076, χ(2) /df =4.8, comparative fit index [CFI] =0.83). An EFA on 28 items of the scale found 4 factors which altogether explained 42.62% of variances: The model was acceptable (RMSEA =0.07, SRMR =0.07, χ(2)/df =2.8, incremental fit index =0.90, CFI =0.90). There was a negative correlation between the procrastination scores and the students' average scores (r = -0.131, P =0.02). The Farsi version of the PASS is a valid and reliable tool to measure academic procrastination in Iranian undergraduate medical students.

  20. Medical Students Circadian Sleep Rhythms and Academic Performance

    Directory of Open Access Journals (Sweden)

    Isabel Pérez-Olmos

    2006-10-01

    Full Text Available Objective: to evaluate, with a preliminarystudy, the distribution of circadian rhythms, sleepschedule patterns and their relationship withacademic performance on medical students.Methodology: in this descriptive study, a 10 itemoriginal questionnaire about sleep rhythms andacademic performance was applied to medicalstudents from different semesters. Week (classtime and weekend schedules, preferences,daytime somnolence and academic performancewere asked. Three chronotypes (morningness,intermediate and eveningness were definedamong waking-sleeping preference, difficulty tosleep early, exam preparation preference hour and real sleep schedule. The sleep hour deficit perweek night was also calculated. Results: Of the318 medical students that answered the questionnaire,62.6% corresponded to intermediatechronotypes, 8.8% to evening-type and 28.7%to morning-type. Significant difference wasfound among the two chronotype tails (p=0.000,Chi-square 31.13. No correlation was foundbetween academic performance and age, sex,chronotype, week sleep deficit and sleep hours inweek and weekends. A 71.1% of the students slept6 or fewer hours during class time and 78% hada sleep deficit (more frequent in the eveningchronotype. Conclusions: No relation was foundbetween sleep chronotype and academic performance.Students tend to morningness. Fewstudies have been made on equatorial zones orwithout seasons.

  1. Schedulability of Herschel revisited using statistical model checking

    DEFF Research Database (Denmark)

    David, Alexandre; Larsen, Kim Guldstrand; Legay, Axel

    2015-01-01

    -approximation technique. We can safely conclude that the system is schedulable for varying values of BCET. For the cases where deadlines are violated, we use polyhedra to try to confirm the witnesses. Our alternative method to confirm non-schedulability uses statistical model-checking (SMC) to generate counter...... and blocking times of tasks. Consequently, the method may falsely declare deadline violations that will never occur during execution. This paper is a continuation of previous work of the authors in applying extended timed automata model checking (using the tool UPPAAL) to obtain more exact schedulability...... analysis, here in the presence of non-deterministic computation times of tasks given by intervals [BCET,WCET]. Computation intervals with preemptive schedulers make the schedulability analysis of the resulting task model undecidable. Our contribution is to propose a combination of model checking techniques...

  2. Factors affecting assertiveness among student nurses.

    Science.gov (United States)

    Ibrahim, Sanaa Abd El Azim

    2011-05-01

    This study aimed to investigate the factors affecting assertiveness among student nurses. The study was carried out at Faculty of Nursing, Port-Said University, on 207 student nurses from four different grades. Rathus Assertiveness Schedule, consisted of 30 items, was used to measure the students' assertiveness level and a 12-item scale developed by Spreitzer was used to measure students' psychological empowerment. The study results showed that 60.4% of the students were assertive, while about half of the students were empowered. A positive relation between student assertiveness and psychological empowerment was detected. Moreover, positive relations regarding family income and students' assertiveness and psychological empowerment were determined. The study recommended introduction of specific courses aiming at enhancing the acquisition of assertiveness skills, in addition, nurse educators must motivate their students to express their opinion and personal rights and also they must pay attention for students' empowerment and enhance students' autonomy. Copyright © 2010 Elsevier Ltd. All rights reserved.

  3. The Synthesis of a Hardware Scheduler for Non-Manifest Loops

    NARCIS (Netherlands)

    Mansour, O.; Molenkamp, Egbert; Krol, Th.

    This paper addresses the hardware implementation of a dynamic scheduler for non-manifest data dependent periodic loops. Static scheduling techniques which are known to give near optimal scheduling-solutions for manifest loops, fail at scheduling non-manifest loops, since they lack the run time

  4. Multiresource allocation and scheduling for periodic soft real-time applications

    Science.gov (United States)

    Gopalan, Kartik; Chiueh, Tzi-cker

    2001-12-01

    Real-time applications that utilize multiple system resources, such as CPU, disks, and network links, require coordinated scheduling of these resources in order to meet their end-to-end performance requirements. Most state-of-the-art operating systems support independent resource allocation and deadline-driven scheduling but lack coordination among multiple heterogeneous resources. This paper describes the design and implementation of an Integrated Real-time Resource Scheduler (IRS) that performs coordinated allocation and scheduling of multiple heterogeneous resources on the same machine for periodic soft real-time application. The principal feature of IRS is a heuristic multi-resource allocation algorithm that reserves multiple resources for real-time applications in a manner that can maximize the number of applications admitted into the system in the long run. At run-time, a global scheduler dispatches the tasks of the soft real-time application to individual resource schedulers according to the precedence constraints between tasks. The individual resource schedulers, which could be any deadline based schedulers, can make scheduling decisions locally and yet collectively satisfy a real-time application's performance requirements. The tightness of overall timing guarantees is ultimately determined by the properties of individual resource schedulers. However, IRS maximizes overall system resource utilization efficiency by coordinating deadline assignment across multiple tasks in a soft real-time application.

  5. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH

    Directory of Open Access Journals (Sweden)

    Sukho Oh

    2018-04-01

    Full Text Available Time Slotted Channel Hopping (TSCH is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  6. Scheduled meals and scheduled palatable snacks synchronize circadian rhythms: consequences for ingestive behavior.

    Science.gov (United States)

    Escobar, Carolina; Salgado, Roberto; Rodriguez, Katia; Blancas Vázquez, Aurea Susana; Angeles-Castellanos, Manuel; Buijs, Ruud M

    2011-09-26

    Food is a potent time signal for the circadian system and has shown to entrain and override temporal signals transmitted by the biological clock, the suprachiasmatic nucleus, which adjusts mainly to the daily light/dark (LD) alternation. Organisms mostly ingest food in their active period and this permits a correct coordination between the LD and the food elicited time signals with the circadian system. Under conditions when feeding opportunities are shifted to the usual resting/sleep phase, the potent entraining force of food, shifts circadian fluctuations in several tissues, organs, and brain structures toward meal time, resulting a desynchrony within the body and between the organism and the external LD cycle. The daily scheduled access to a palatable snack exerts similar changes specifically to brain areas involved in motivation and reward responses. This review describes the phenomenology of food entrainment and entrainment by a palatable snack. It suggests how scheduled feeding can lead to food addiction and how shifted feeding schedules toward the sleep phase can result in altered ingestive behavior, obesity and disturbed metabolic responses. Copyright © 2011 Elsevier Inc. All rights reserved.

  7. Distributed Research Project Scheduling Based on Multi-Agent Methods

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta Bodea

    2011-01-01

    Full Text Available Different project planning and scheduling approaches have been developed. The Operational Research (OR provides two major planning techniques: CPM (Critical Path Method and PERT (Program Evaluation and Review Technique. Due to projects complexity and difficulty to use classical methods, new approaches were developed. Artificial Intelligence (AI initially promoted the automatic planner concept, but model-based planning and scheduling methods emerged later on. The paper adresses the project scheduling optimization problem, when projects are seen as Complex Adaptive Systems (CAS. Taken into consideration two different approaches for project scheduling optimization: TCPSP (Time- Constrained Project Scheduling and RCPSP (Resource-Constrained Project Scheduling, the paper focuses on a multiagent implementation in MATLAB for TCSP. Using the research project as a case study, the paper includes a comparison between two multi-agent methods: Genetic Algorithm (GA and Ant Colony Algorithm (ACO.

  8. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  9. Integrated sampling and analysis plan for samples measuring >10 mrem/hour

    International Nuclear Information System (INIS)

    Haller, C.S.

    1992-03-01

    This integrated sampling and analysis plan was prepared to assist in planning and scheduling of Hanford Site sampling and analytical activities for all waste characterization samples that measure greater than 10 mrem/hour. This report also satisfies the requirements of the renegotiated Interim Milestone M-10-05 of the Hanford Federal Facility Agreement and Consent Order (the Tri-Party Agreement). For purposes of comparing the various analytical needs with the Hanford Site laboratory capabilities, the analytical requirements of the various programs were normalized by converting required laboratory effort for each type of sample to a common unit of work, the standard analytical equivalency unit (AEU). The AEU approximates the amount of laboratory resources required to perform an extensive suite of analyses on five core segments individually plus one additional suite of analyses on a composite sample derived from a mixture of the five core segments and prepare a validated RCRA-type data package

  10. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  11. Courts, Scheduled Damages, and Medical Malpractice Insurance

    DEFF Research Database (Denmark)

    Bertoli, Paola; Grembi, Veronica

    We assess the impact of the introduction of schedules of non-economic damages (i.e. tiered caps systems) on the behavior of insurers operating in the medical liability market for hospitals while controlling the performance of the judicial system, measured as court backlog. Using a difference......-in-differences strategy on Italian data, we find that the introduction of schedules increases the presence of insurers (i.e. medical liability market attractiveness) only in inefficient judicial districts. In the same way, court inefficiency is attractive to insurers for average values of schedules penetration...... of the market, with an increasing positive impact of inefficiency as the territorial coverage of schedules increases. Finally, no significant impact is registered on paid premiums. Our analysis sheds light on a complex set of elements affecting the decisions of insurers in malpractice markets. The analysis...

  12. Support for Restorative Justice in a Sample of U.S. University Students.

    Science.gov (United States)

    Ahlin, Eileen M; Gibbs, Jennifer C; Kavanaugh, Philip R; Lee, Joongyeup

    2017-02-01

    Theories of restorative justice suggest that the practice works best when offenders are enmeshed in multiple interdependencies or attachments to others and belong to a culture that facilitates communitarianism instead of individualism. Restorative justice principles and practices are thus believed to be incongruent with the individualistic culture and legal system of the United States, especially compared with that of nations like Australia and Japan. Using a nonprobability convenience sample of students enrolled in a large public university in the United States, our study examines attitudes toward restorative justice as a fair and just process for reintegrating offenders and meeting the needs of victims. Results indicate that our sample holds less punitive attitudes than citizens in either Australia or Japan. Our findings are discussed in light of recent policy shifts in the United States that suggest a concerted move toward decarceration following the 2008 recession.

  13. Optimal updating magnitude in adaptive flat-distribution sampling.

    Science.gov (United States)

    Zhang, Cheng; Drake, Justin A; Ma, Jianpeng; Pettitt, B Montgomery

    2017-11-07

    We present a study on the optimization of the updating magnitude for a class of free energy methods based on flat-distribution sampling, including the Wang-Landau (WL) algorithm and metadynamics. These methods rely on adaptive construction of a bias potential that offsets the potential of mean force by histogram-based updates. The convergence of the bias potential can be improved by decreasing the updating magnitude with an optimal schedule. We show that while the asymptotically optimal schedule for the single-bin updating scheme (commonly used in the WL algorithm) is given by the known inverse-time formula, that for the Gaussian updating scheme (commonly used in metadynamics) is often more complex. We further show that the single-bin updating scheme is optimal for very long simulations, and it can be generalized to a class of bandpass updating schemes that are similarly optimal. These bandpass updating schemes target only a few long-range distribution modes and their optimal schedule is also given by the inverse-time formula. Constructed from orthogonal polynomials, the bandpass updating schemes generalize the WL and Langfeld-Lucini-Rago algorithms as an automatic parameter tuning scheme for umbrella sampling.

  14. Environmental Behavior of Secondary Education Students: A Case Study at Central Greece

    Directory of Open Access Journals (Sweden)

    Stamatios Ntanos

    2018-05-01

    Full Text Available During the last three decades, human behavior has been becoming energy alarming towards environmental sustainability. One of the most influential initiatives towards environmental protection and increased environmental consciousness is the solidification of primary and secondary environmental education. The purpose of this paper is to investigate different environmental profiles amongst secondary education students, in light of a multi-parametric analysis that involved the contributive role of school and family towards environmental awareness and participation. By reviewing relevant studies, the benefits offered by environmental education are presented. Accordingly, a questionnaire survey was deployed using a sample of 270 secondary education students, from schools situated in the prefecture of Larissa, central Greece. The statistical methods included factor analysis and cluster analysis. Particularly, four groups of different environmental characteristics are identified and interviewed. Results suggest that most students are environmental affectionate, although there is a need for more solidified environmental education and motivation from out-of-school societal opportunities, such as in the contexts of family and public socialization. The deployed research method and analysis can be proven supportive in adopting and scheduling school environmental programs after an initial identification of the various environmental attitudes among the student population.

  15. [Habits and problems of sleep in adolescent students].

    Science.gov (United States)

    Lazaratou, E; Dikeos, D; Anagnostopoulos, D; Soldatos, C

    2008-07-01

    The evaluation of sleep habits and sleep related problems in high school adolescent students in the Athens area and the assessment of these problems' relation to demographic and other variables was investigated by the Athens Insomnia Scale - 5 item version (AIS-5), which was administered to 713 adolescent Senior High School students in the Greater Athens Area. Data such as age, sex, school records, and time spent per week in school-related and extracurricular activities were collected. The sample's mean sleep duration was 7,5 hours, mean bedtime 12:20 am and wake-up time 7:15 am. Total sleep time was not affected by gender, but was influenced by time spent in various activities. Sleep complaints were related to delayed sleep, onset latency and insufficient total duration of sleep. Girls complained more than boys, while correlations showed that students with lower academic per formance and those in second grade were more likely to have higher AIS-5 scores. The results show that sleep time of high school students is dependent on practical matters such as school schedule and other activities, while sleep complaints are related to female gender, bad school performance as well as to the second grade. The difference between actual sleep time and sleep complaints should be considered when studying the sleep of adolescents.

  16. Evaluation of a twelve-hour/day shift schedule

    International Nuclear Information System (INIS)

    Lewis, P.M.; Swaim, D.J.

    1986-01-01

    In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8-hour to a 12-hour a day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off-the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility

  17. Nursing teamwork, staff characteristics, work schedules, and staffing.

    Science.gov (United States)

    Kalisch, Beatrice J; Lee, Hyunhwa

    2009-01-01

    This study aimed to explore whether and how staff characteristics, staffing, and scheduling variables are associated with the level of teamwork in nursing staff on acute care hospital patient units. This was a cross-sectional study with a sample of 1,758 nursing staff members from two different hospitals on 38 patient care units who completed the Nursing Teamwork Survey in 2008. This study focused on nursing teams who are stationed on a particular patient care unit (as opposed to visitors to the units). The return rate was 56.9%. The sample was made up of 77.4% nurses (registered nurses and licensed practical nurses), 11.9% assistive personnel, and 7.9% unit secretaries. Teamwork varied by unit and service type, with the highest scores occurring in pediatrics and maternity and the lowest scores on the medical-surgical and emergency units. Staff with less than 6 months of experience, those working 8- or 10-hour shifts (as opposed to 12 hours or a combination of 8 and 12 hours), part-time staff (as opposed to full time), and those working on night shift had higher teamwork scores. The higher teamwork scores were also associated with no or little overtime. The higher perception of the adequacy of staffing and the fewer patients cared for on a previous shift, the higher the teamwork scores. There is a relationship between selected staff characteristics, aspects of work schedules, staffing, and teamwork. Nursing staff want to work where teamwork is high, and perceptions of good staffing lead to higher teamwork. Higher teamwork scores correlated with those who worked less overtime.

  18. ALGORITHMIC CONSTRUCTION SCHEDULES IN CONDITIONS OF TIMING CONSTRAINTS

    Directory of Open Access Journals (Sweden)

    Alexey S. Dobrynin

    2014-01-01

    Full Text Available Tasks of time-schedule construction (JSSP in various fields of human activities have an important theoretical and practical significance. The main feature of these tasks is a timing requirement, describing allowed planning time periods and periods of downtime. This article describes implementation variations of the work scheduling algorithm under timing requirements for the tasks of industrial time-schedules construction, and service activities.

  19. Tail-robust scheduling using Limited Processor Sharing.

    NARCIS (Netherlands)

    Nair, J.K.; Wierman, A.; Zwart, A.P.

    2010-01-01

    From a rare events perspective, scheduling disciplines that work well under light (exponential) tailed workload distributions do not perform well under heavy (power) tailed workload distributions, and vice versa, leading to fundamental problems in designing schedulers that are robust to

  20. The application of artificial intelligence to astronomical scheduling problems

    Science.gov (United States)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike

  1. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  2. Designing a fuzzy scheduler for hard real-time systems

    Science.gov (United States)

    Yen, John; Lee, Jonathan; Pfluger, Nathan; Natarajan, Swami

    1992-01-01

    In hard real-time systems, tasks have to be performed not only correctly, but also in a timely fashion. If timing constraints are not met, there might be severe consequences. Task scheduling is the most important problem in designing a hard real-time system, because the scheduling algorithm ensures that tasks meet their deadlines. However, the inherent nature of uncertainty in dynamic hard real-time systems increases the problems inherent in scheduling. In an effort to alleviate these problems, we have developed a fuzzy scheduler to facilitate searching for a feasible schedule. A set of fuzzy rules are proposed to guide the search. The situation we are trying to address is the performance of the system when no feasible solution can be found, and therefore, certain tasks will not be executed. We wish to limit the number of important tasks that are not scheduled.

  3. Intercultural training of medical students.

    Science.gov (United States)

    van Wieringen, J.C.M.; Schulpen, T.W.J.; Kuyvenhoven, M.M.

    2001-01-01

    Until recently the Utrecht Medical School had a traditional curriculum with a predominantly biomedical orientation and strong emphasis on curative medicine. In 1997 an experimental 'Multi-cultural Family Attachment Course' started at the Utrecht Medical School with 20 second-year medical students. Each student was attached to a native Dutch and an ethnic minority family with a newborn or chronically ill child. In a period of 1.5 years students had to visit each family at home four times. The students monitored growth and development of the child and discussed several aspects of health and disease with the parents according to a structured schedule. In regular group sessions students reported back their experiences. In this way, the influence of socioeconomic circumstances, culture and environment on health becomes a real-life experience. This paper aims to describe some aspects of this pilot-course and the reactions of the students.

  4. Pornography consumption and non-marital sexual behaviour in a sample of young Indonesian university students

    DEFF Research Database (Denmark)

    Hald, Gert Martin; Mulya, Teguh Wijaya

    2013-01-01

    Using a sample of Indonesian university students and a cross sectional design, this study investigated prevalence rates and patterns of pornography consumption in Indonesia, a religious, sexually conservative, Muslim-majority nation with strict anti-pornography laws. Further, the association...... between pornography consumption and common non-marital sexual behaviours was explored. The study found that in this sample, pornography is as widely and readily consumed as in comparable international studies predominantly utilising Western background samples from more sexually liberal and less religious...... countries with very few laws on pornography. Gender differences in patterns of pornography consumption were pronounced and comparable with findings in international counterpart studies. For men only, pornography consumption was found to significantly predict common sexual behaviours in non-marital relations...

  5. User interface issues in supporting human-computer integrated scheduling

    Science.gov (United States)

    Cooper, Lynne P.; Biefeld, Eric W.

    1991-01-01

    The topics are presented in view graph form and include the following: characteristics of Operations Mission Planner (OMP) schedule domain; OMP architecture; definition of a schedule; user interface dimensions; functional distribution; types of users; interpreting user interaction; dynamic overlays; reactive scheduling; and transitioning the interface.

  6. Some extensions of the discrete lotsizing and scheduling problem

    NARCIS (Netherlands)

    M. Salomon (Marc); L.G. Kroon (Leo); R. Kuik (Roelof); L.N. van Wassenhove (Luk)

    1991-01-01

    textabstractIn this paper the Discrete Lotsizing and Scheduling Problem (DLSP) is considered. DLSP relates to capacitated lotsizing as well as to job scheduling problems and is concerned with determining a feasible production schedule with minimal total costs in a single-stage manufacturing process.

  7. The applicability of knowledge-based scheduling to the utilities industry

    International Nuclear Information System (INIS)

    Yoshimoto, G.; Gargan, R. Jr.; Duggan, P.

    1992-01-01

    The Electric Power Research Institute (EPRI), Nuclear Power Division, has identified the three major goals of high technology applications for nuclear power plants. These goals are to enhance power production through increasing power generation efficiency, to increase productivity of the operations, and to reduce the threats to the safety of the plant. Our project responds to the second goal by demonstrating that significant productivity increases can be achieved for outage maintenance operations based on existing knowledge-based scheduling technology. Its use can also mitigate threats to potential safety problems by means of the integration of risk assessment features into the scheduler. The scheduling approach uses advanced techniques enabling the automation of the routine scheduling decision process that previously was handled by people. The process of removing conflicts in scheduling is automated. This is achieved by providing activity representations that allow schedulers to express a variety of different scheduling constraints and by implementing scheduling mechanisms that simulate kinds of processes that humans use to find better solutions from a large number of possible solutions. This approach allows schedulers to express detailed constraints between activities and other activities, resources (material and personnel), and requirements that certain states exist for their execution. Our scheduler has already demonstrated its benefit to improving the shuttle processing flow management at Kennedy Space Center. Knowledge-based scheduling techniques should be examined by utilities industry researchers, developers, operators and management for application to utilities planning problems because of its great cost benefit potential. 4 refs., 4 figs

  8. Effects of achievement differences for internal/external frame of reference model investigations: A test of robustness of findings over diverse student samples.

    Science.gov (United States)

    Schmidt, Isabelle; Brunner, Martin; Preckel, Franzis

    2017-11-12

    Achievement in math and achievement in verbal school subjects are more strongly correlated than the respective academic self-concepts. The internal/external frame of reference model (I/E model; Marsh, 1986, Am. Educ. Res. J., 23, 129) explains this finding by social and dimensional comparison processes. We investigated a key assumption of the model that dimensional comparisons mainly depend on the difference in achievement between subjects. We compared correlations between subject-specific self-concepts of groups of elementary and secondary school students with or without achievement differences in the respective subjects. The main goals were (1) to show that effects of dimensional comparisons depend to a large degree on the existence of achievement differences between subjects, (2) to demonstrate the generalizability of findings over different grade levels and self-concept scales, and (3) to test a rarely used correlation comparison approach (CCA) for the investigation of I/E model assumptions. We analysed eight German elementary and secondary school student samples (grades 3-8) from three independent studies (Ns 326-878). Correlations between math and German self-concepts of students with identical grades in the respective subjects were compared with the correlation of self-concepts of students having different grades using Fisher's Z test for independent samples. In all samples, correlations between math self-concept and German self-concept were higher for students having identical grades than for students having different grades. Differences in median correlations had small effect sizes for elementary school students and moderate effect sizes for secondary school students. Findings generalized over grades and indicated a developmental aspect in self-concept formation. The CCA complements investigations within I/E-research. © 2017 The British Psychological Society.

  9. Teachers' Perceptions of Bullying of Lesbian, Gay, Bisexual, Transgender, and Questioning (LGBTQ) Students in a Southwestern Pennsylvania Sample.

    Science.gov (United States)

    Kolbert, Jered B; Crothers, Laura M; Bundick, Matthew J; Wells, Daniel S; Buzgon, Julie; Berbary, Cassandra; Simpson, Jordan; Senko, Katherine

    2015-05-28

    This study was designed to ascertain teachers' perceptions of bullying of Lesbian, Gay, Bisexual, Transgender, and Questioning (LGBTQ) youth. In a sample of 200 educators (61.0% female; 96.5% White) from a county in southwestern Pennsylvania, there was a significant positive relationship between the teachers' perceptions of the supportiveness of school staff towards students regardless of sexual orientation and those teachers' reports of the frequency of bullying victimization experienced by LGBTQ students. Teachers' perceptions of a higher level of staff and student support was associated with higher reported frequencies of students' use of derogatory language about LGBTQ individuals and various types of bullying of LGBTQ students. Teachers with a lesbian, gay, or bisexual orientation were found to rate the school staff and students as significantly less supportive of students regardless of their sexual orientation, gender identity, or gender expression in comparison to heterosexual teachers. Finally, teachers who either were unaware of or believed that their school lacked an anti-bullying policy reported significantly higher rates of physical bullying victimization of LGBTQ students when compared to the rates observed by teachers who reported knowledge of their schools' anti-bullying policies.

  10. Microcomputer-based workforce scheduling for hospital porters.

    Science.gov (United States)

    Lin, C K

    1999-01-01

    This paper focuses on labour scheduling for hospital porters who are the major workforce providing routine cleansing of wards, transportation and messenger services. Generating an equitable monthly roster for porters while meeting the daily minimum demand is a tedious task scheduled manually by a supervisor. In considering a variety of constraints and goals, a manual schedule was usually produced in seven to ten days. To be in line with the strategic goal of scientific management of an acute care regional hospital in Hong Kong, a microcomputer-based algorithm was developed to schedule the monthly roster. The algorithm, coded in Digital Visual Fortran 5.0 Professional, could generate a monthly roster in seconds. Implementation has been carried out since September 1998 and the results proved to be useful to hospital administrators and porters. This paper discusses both the technical and human issues involved during the computerization process.

  11. Car painting process scheduling with harmony search algorithm

    Science.gov (United States)

    Syahputra, M. F.; Maiyasya, A.; Purnamawati, S.; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Automotive painting program in the process of painting the car body by using robot power, making efficiency in the production system. Production system will be more efficient if pay attention to scheduling of car order which will be done by considering painting body shape of car. Flow shop scheduling is a scheduling model in which the job-job to be processed entirely flows in the same product direction / path. Scheduling problems often arise if there are n jobs to be processed on the machine, which must be specified which must be done first and how to allocate jobs on the machine to obtain a scheduled production process. Harmony Search Algorithm is a metaheuristic optimization algorithm based on music. The algorithm is inspired by observations that lead to music in search of perfect harmony. This musical harmony is in line to find optimal in the optimization process. Based on the tests that have been done, obtained the optimal car sequence with minimum makespan value.

  12. Testing the predictions of the existential constructivist theory of suicide in a college student sample.

    Science.gov (United States)

    Lockman, Jennifer D; Servaty-Seib, Heather L

    2018-04-01

    There is a lack of empirically supported theories explaining suicidal ideation and few theories describe how suicidal ideation can be prevented in the context of normative human development. Rogers (2001) proposed an existential constructivist theory of suicide (ECTS) wherein existential distress and the inability to reconstruct meaning from adverse life events contribute to suicidal ideation. The ECTS includes a distinct focus on meaning reconstruction from adverse life events, which is congruent with existing research on college students and developmental frameworks used by counseling psychologists. Thus, in the present study, we tested the predictions of the ECTS in a college student sample. We collected data online from 195 college students (i.e., ages 18-25) attending a large, Midwestern university and analyzed the data using structural equation modeling. Findings provided partial support for the original ECTS. Post hoc analyses of an alternate ECTS model indicated that existential distress mediated the negative association between meaning reconstruction and suicidal ideation. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  13. Peer-to-peer Cooperative Scheduling Architecture for National Grid Infrastructure

    Science.gov (United States)

    Matyska, Ludek; Ruda, Miroslav; Toth, Simon

    For some ten years, the Czech National Grid Infrastructure MetaCentrum uses a single central PBSPro installation to schedule jobs across the country. This centralized approach keeps a full track about all the clusters, providing support for jobs spanning several sites, implementation for the fair-share policy and better overall control of the grid environment. Despite a steady progress in the increased stability and resilience to intermittent very short network failures, growing number of sites and processors makes this architecture, with a single point of failure and scalability limits, obsolete. As a result, a new scheduling architecture is proposed, which relies on higher autonomy of clusters. It is based on a peer to peer network of semi-independent schedulers for each site or even cluster. Each scheduler accepts jobs for the whole infrastructure, cooperating with other schedulers on implementation of global policies like central job accounting, fair-share, or submission of jobs across several sites. The scheduling system is integrated with the Magrathea system to support scheduling of virtual clusters, including the setup of their internal network, again eventually spanning several sites. On the other hand, each scheduler is local to one of several clusters and is able to directly control and submit jobs to them even if the connection of other scheduling peers is lost. In parallel to the change of the overall architecture, the scheduling system itself is being replaced. Instead of PBSPro, chosen originally for its declared support of large scale distributed environment, the new scheduling architecture is based on the open-source Torque system. The implementation and support for the most desired properties in PBSPro and Torque are discussed and the necessary modifications to Torque to support the MetaCentrum scheduling architecture are presented, too.

  14. Dynamic Scheduling for Cloud Reliability using Transportation Problem

    OpenAIRE

    P. Balasubramanie; S. K. Senthil Kumar

    2012-01-01

    Problem statement: Cloud is purely a dynamic environment and the existing task scheduling algorithms are mostly static and considered various parameters like time, cost, make span, speed, scalability, throughput, resource utilization, scheduling success rate and so on. Available scheduling algorithms are mostly heuristic in nature and more complex, time consuming and does not consider reliability and availability of the cloud computing environment. Therefore there is a need to implement a sch...

  15. Who benefits from family support? Work schedule and family differences.

    Science.gov (United States)

    Jennings, Kristen S; Sinclair, Robert R; Mohr, Cynthia D

    2016-01-01

    Prior research has demonstrated the benefits of family-supportive organization perceptions (FSOP) for reducing stress, increasing satisfaction, and increasing worker commitment; however, less research has studied health outcomes or possible differences in the effects of FSOP based on worker characteristics. The present study examined relationships between FSOP and health outcomes, as well as how those relationships may depend on work schedule and family differences. Using a sample of 330 acute care nurses, the findings indicated that FSOP predicted several health and well-being outcomes obtained 9 months later. Further, the relationships between FSOP and the outcome variables depended on some work schedule and family differences. In terms of family differences, FSOP was most strongly related to life satisfaction for those who cared for dependent adults. The relationship between FSOP and health outcomes of depression, musculoskeletal pain, and physical health symptoms were generally significant for workers with dependent children, but not significant for workers with no children. Regarding schedule differences, the relationship between FSOP and life satisfaction was significant for those on nonstandard (evening/night) shifts but not significant for standard day shift workers; however, there were no differences in FSOP relationships by number of hours worked per week. The findings demonstrate that FSOP may benefit some employees more than others. Such differences need to be incorporated into both future work-family theory development and into efforts to document the effectiveness of family-supportive policies, programs, and practices. (c) 2016 APA, all rights reserved).

  16. Diagnosing Autism Spectrum Disorders in Adults : the Use of Autism Diagnostic Observation Schedule (ADOS) Module 4

    NARCIS (Netherlands)

    Bastiaansen, Jojanneke A.; Meffert, Harma; Hein, Simone; Huizinga, Petra; Ketelaars, Cees; Pijnenborg, Marieke; Bartels, Arnold; Minderaa, Ruud; Keysers, Christian; de Bildt, Annelies

    Autism Diagnostic Observation Schedule (ADOS) module 4 was investigated in an independent sample of high-functioning adult males with an autism spectrum disorder (ASD) compared to three specific diagnostic groups: schizophrenia, psychopathy, and typical development. ADOS module 4 proves to be a

  17. Smoking and its risk factors in Chinese elementary and middle school students: a nationally representative sample study.

    Science.gov (United States)

    Zhang, Xinghui; Li, Yajun; Zhang, Qin; Lu, Furong; Wang, Yun

    2014-05-01

    The purpose of this study was to examine the prevalence of smoking in a nationally representative sample of Chinese elementary and middle school students and to investigate its risk factors from families and schools. The data were from the National Children's Study of China (NCSC), in which 24,013 fourth- to ninth-grade students were recruited from 100 counties in 31 provinces in China. Chi-square tests and one-way ANOVAs were used to analyze the relationships between smoking and the risk factors. Logistic regressions were used to calculate odds ratios. The prevalence of ever smokers and current smokers were 19.0% and 5.4%. Focusing on current smokers, boys, middle school students, rural students, boarding students, non-only children and those owning parents with low educational levels reported smoking significantly more than girls, elementary school students, urban students, non-boarding students, only children and those owning parents with high educational levels. Lower trust and support from teachers and higher parent-child conflict positively predicted both smoking and smoking frequency. Lower trust and support from classmates was associated with higher possibility of smoking. However, higher trust and support from classmates was associated with higher smoking frequency. Teacher smoking and friend smoking were only predictive of smoking, but not of smoking frequency. Boys, middle school students, rural students, boarding students, non-only children and those owning parents with low educational levels need special attention. The most risk factors for smoking and smoking frequency were lower trust and support from teachers and higher parent-child conflict. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. Measuring and reducing college students' procrastination.

    Science.gov (United States)

    Perrin, Christopher J; Miller, Neal; Haberlin, Alayna T; Ivy, Jonathan W; Meindl, James N; Neef, Nancy A

    2011-01-01

    We examined college students' procrastination when studying for weekly in-class quizzes. Two schedules of online practice quiz delivery were compared using a multiple baseline design. When online study material was made available noncontingently, students usually procrastinated. When access to additional study material was contingent on completing previous study material, studying was more evenly distributed. Overall, the mean gain in percentage correct scores on weekly in-class quizzes relative to pretests was greater during contingent access than during noncontingent access conditions.

  19. Optimal Algorithms and a PTAS for Cost-Aware Scheduling

    NARCIS (Netherlands)

    L. Chen; N. Megow; R. Rischke; L. Stougie (Leen); J. Verschae

    2015-01-01

    htmlabstractWe consider a natural generalization of classical scheduling problems in which using a time unit for processing a job causes some time-dependent cost which must be paid in addition to the standard scheduling cost. We study the scheduling objectives of minimizing the makespan and the

  20. 5 CFR 532.513 - Flexible and compressed work schedules.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Flexible and compressed work schedules... REGULATIONS PREVAILING RATE SYSTEMS Premium Pay and Differentials § 532.513 Flexible and compressed work schedules. Federal Wage System employees who are authorized to work flexible and compressed work schedules...