WorldWideScience

Sample records for strike contingency planning

  1. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  2. Contingency planning: preparation of contingency plans

    DEFF Research Database (Denmark)

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...... in the preparation for and the handling of an epidemic. The legislation of the European Union requires that all Member States draw up a contingency plan which specifies the national measures required to maintain a high level of awareness and preparedness and is to be implemented in the event of disease outbreak...

  3. Licensee safeguards contingency plans

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The Nuclear Regulatory Commission is amending its regulations to require that licensees authorized to operate a nuclear reactor (other than certain research and test reactors), and those authorized to possess strategic quantities of plutonium, uranium-233, or uranium-235 develop and implement acceptable plans for responding to threats, thefts, and industrial sabotage of licensed nuclear materials and facilities. The plans will provide a structured, orderly, and timely response to safeguards contingencies and will be an important segment of NRC's contingency planning programs. Licensee safeguards contingency plans will result in organizing licensee's safeguards resources in such a way that, in the unlikely event of a safeguards contingency, the responding participants will be identified, their several responsibilities specified, and their responses coordinated

  4. Appendix F - Sample Contingency Plan

    Science.gov (United States)

    This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).

  5. 30 CFR 282.26 - Contingency Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Contingency Plan. 282.26 Section 282.26 Mineral... § 282.26 Contingency Plan. (a) When required by the Director, a lessee shall include a Contingency Plan as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan...

  6. National Contingency Plan Subpart J

    Science.gov (United States)

    Subpart J of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating devices and substances that may be used to remove or control oil discharges.

  7. 49 CFR 1544.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1544.301 Section 1544.301... COMMERCIAL OPERATORS Threat and Threat Response § 1544.301 Contingency plan. Each aircraft operator must adopt a contingency plan and must: (a) Implement its contingency plan when directed by TSA. (b) Ensure...

  8. Developing standardized facility contingency plans

    International Nuclear Information System (INIS)

    Davidson, D.A.

    1993-01-01

    Texaco consists of several operating departments that are, in effect, independent companies. Each of these departments is responsible for complying with all environmental laws and regulations. This includes the preparation by each facility to respond to an oil spill at that location. For larger spills, however, management of the response will rest with corporate regional response teams. Personnel from all departments make up the regional teams. In 1990, Congress passed the Oil Pollution Act. In 1991, the US Coast Guard began developing oil spill response contingency plan regulations, which they are still working on. Meanwhile, four of the five west coast states have also passed laws requiring contingency plans. (Only Hawaii has chosen to wait and see what the federal regulations will entail). Three of the states have already adopted regulations. Given these laws and regulations, along with its corporate structure, Texaco addressed the need to standardize local facility plans as well as its response organization. This paper discusses how, by working together, the Texaco corporate international oil spill response staff and the Texaco western region on-scene commander developed: A standard contingency plan format crossing corporate boundaries and meeting federal and state requirements. A response organization applicable to any size facility or spill. A strategy to sell the standard contingency plan and response organization to the operating units

  9. 49 CFR 1542.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1542.301 Section 1542.301..., DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...

  10. Network location theory and contingency planning

    Energy Technology Data Exchange (ETDEWEB)

    Hakimi, S L

    1983-08-01

    A brief survey of results in network location theory is first presented. Then, a systems view of contingency planning is described. Finally, some results in location theory are re-examined and it is shown that they are motivated by contingency planning considerations. Some new issues and problems in location theory are described, which, if properly tackled, will have a substantial impact on contingency planning in transportation.

  11. 40 CFR 264.53 - Copies of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 264.53... Contingency Plan and Emergency Procedures § 264.53 Copies of contingency plan. A copy of the contingency plan... called upon to provide emergency services. [Comment: The contingency plan must be submitted to the...

  12. 40 CFR 265.53 - Copies of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  13. 40 CFR 265.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 265.54... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.54 Amendment of contingency plan. The contingency plan must be reviewed, and immediately amended, if necessary, whenever: (a) Applicable regulations...

  14. 40 CFR 264.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 264.54 Section 264.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Contingency Plan and Emergency Procedures § 264.54 Amendment of contingency plan. The contingency plan must be...

  15. Yampa River Valley sub-area contingency plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    The Yampa River Valley sub-area contingency plan (Contingency Plan) has been prepared for two counties in northwestern Colorado: Moffat County and Routt County. The Contingency Plan is provided in two parts, the Contingency Plan and the Emergency Response Action Plan (ERAP). The Contingency Plan provides information that should be helpful in planning to minimize the impact of an oil spill or hazardous material incident. It contains discussions of planning and response role, hazards identification, vulnerability analysis, risk analysis, cleanup, cost recovery, training, and health and safety. It includes information on the incident command system, notifications, response capabilities, emergency response organizations, evacuation and shelter-in-place, and immediate actions.

  16. 40 CFR 264.227 - Emergency repairs; contingency plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Emergency repairs; contingency plans... FACILITIES Surface Impoundments § 264.227 Emergency repairs; contingency plans. (a) A surface impoundment... days after detecting the problem. (c) As part of the contingency plan required in subpart D of this...

  17. 10 CFR 72.184 - Safeguards contingency plan.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Safeguards contingency plan. 72.184 Section 72.184 Energy... Protection § 72.184 Safeguards contingency plan. (a) The requirements of the licensee's safeguards contingency plan for responding to threats and radiological sabotage must be as defined in appendix C to part...

  18. effect of strikes on management and planning of educational ...

    African Journals Online (AJOL)

    Global Journal

    Strike is an event that consumes and waste a lot of time which implies that ... from this paper. KEYWORDS: Strikes, Management, Planning, Educational, Activities, Universities ..... employers; and Introduction of new technology which affect the ...

  19. Contingency planning in southern Africa: Events rather than processes?

    OpenAIRE

    Elias Mabaso; Siambabala B. Manyena

    2013-01-01

    With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork ...

  20. 40 CFR 300.210 - Federal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... contingency plans under the national response system: The National Contingency Plan, RCPs, and ACPs. These... discharge under § 300.324, and to mitigate or prevent a substantial threat of such a discharge, from a vessel, offshore facility, or onshore facility operating in or near the area. (2) The areas of...

  1. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 264.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The contingency...

  2. Contingency planning in southern Africa: Events rather than processes?

    Directory of Open Access Journals (Sweden)

    Elias Mabaso

    2013-09-01

    Full Text Available With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork was used. The findings show that (1 there was a wide gap between theory and practice in contingency planning, (2 response activities rarely reflected projected scenarios and (3 resources were inadequate for effective contingency planning. We conclude that unless these issues are addressed, contingency planning is likely to remain a theoretical rather than a practical tool for building disaster-resilient communities in southern African countries. Although a generalisation cannot be made on the status of contingency planning and practice in southern Africa without a wider analysis of more examples, the findings may apply beyond the examined contexts and also offer insights into research gaps.

  3. National Contingency Plan (NCP) Subpart J Product Schedule Fact Sheet

    Science.gov (United States)

    This section of the National Oil and Hazardous Substances Pollution Contingency Plan stipulates the criteria for listing and managing the use of dispersants and other chemical and biological agents used to mitigate oil spills.

  4. National contingency plan product schedule data base

    International Nuclear Information System (INIS)

    Putukian, J.; Hiltabrand, R.R.

    1993-01-01

    During oil spills there are always proposals by the technical community and industry to use chemical agents to help in oil spill cleanups. Federal Clean Water Act regulations require that any chemical agents that the federal on-scene coordinator (FOSC) wants to use for oil cleanup be listed on the US Environmental Protection Agency (EPA) National Contingency Plan (NCP) Product Schedule. Chemical countermeasures are among the most controversial, complex, and time-critical issues facing decision-making officials choosing response methods to use on coastal oil spills. There are situations in which dispersants are likely to be one of the most appropriate counter-measure strategies. Dispersants are most effective when applied to fresh oil, and their effectiveness dramatically decreases as the oil weathers, which can begin in as little as 24 hours. To logistically implement dispersant use, a decision would need to be made within roughly the first 4 hours after the release. Most of the information that the FOSC needs to make the determination to use a specific chemical agent exists in manuals, EPA bulletins, and the published literature. This information is not in an easy-to-use format under field emergency conditions. Hence the need to collect and disseminate the information in an automated data base. The sources for the information in this data base are the following. Published results of tests performed by Environment Canada; EPA bulletins associated with the NCP Product Schedule; Published results of tests by the chemical industry. The data base resides on a Macintosh computer and contains information about 70 NCP products, including dispersants, surface collecting agents, and biological additives. It contains information on physical properties, toxicity, heavy metal content, safety precautions, use conditions, etc

  5. Volcanic Eruption: Students Develop a Contingency Plan

    Science.gov (United States)

    Meisinger, Philipp; Wittlich, Christian

    2013-04-01

    , causing a blockage and afflux of the Rhine, which, due to the given conditions of a very narrow valley, would lead to excessive flooding affecting even the greater Rhine-Main-region. Not to mention the consequences of a pyroclastic flow, dropping volcanic bombs and further hazardous/disastrous consequences. In comparison to other "potentially active" or "active volcanoes", e.g. the Vesuvius, the Laacher See is scarcely monitored and according to recent publications poorly analyzed in terms of contingency and evacuation plans. This offers space for critical analysis and creative solutions to an existing problem. Short: We need geographers and their knowledge to provide help. Given these facts, the Laacher See could be the layout for a very interesting geography project bringing together previously gained knowledge and understanding of volcanic activities, their destructive powers, consequences and risks in case of an eruption in combination with their topographical characteristics. Your students thereby act the role of a geoscientist developing contingency plans and evacuation zones for the greater Laacher See area. This involves a detailed analysis of the topographical characteristics based on (classic) topographic maps or online via the use of a GIS (e.g. Google maps). In a second step students enlist the possible consequences they already know according to their range and copy them onto a transparency layer on the topographic map. Using such a layer technique students add population density, important topographic features and maybe even anticipated wind directions to their map. The information density and the specific layout of this map are thereby only determined by the student's previous knowledge, their personal abilities and skills and the amount of time provided. This offers the opportunities to even differentiate the task within your group and provide support adjusted to the individual students level. On the basis of their own thematic map your students should be

  6. 40 CFR 267.54 - When must I amend the contingency plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false When must I amend the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.54 When must I amend the contingency plan? You must review, and immediately amend the contingency plan, if necessary, whenever: (a) The facility...

  7. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., STORAGE, AND DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The...

  8. Dengue Contingency Planning: From Research to Policy and Practice

    Science.gov (United States)

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J.; Sánchez Tejeda, Gustavo; Lloyd, Linda S.; Hakim, Lokman; Bowman, Leigh R.; Horstick, Olaf; Coelho, Giovanini

    2016-01-01

    Background Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Methodology/Principal findings Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Conclusions/Significance Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak

  9. Public education programme for nuclear contingency planning in Hong Kong

    International Nuclear Information System (INIS)

    Wong, M. C.; Li, S. W.

    2002-01-01

    Two nuclear power stations on the coast of southern China are situated some 50 kilometers to the northeast of Hong Kong. Although the stations are far away from Hong Kong, the construction and operation of the nuclear power stations have generated public anxiety locally, in particular, after the Chernobyl accident in 1986. A comprehensive contingency plan which takes into account such concerns of the public has been implemented in Hong Kong. Cooperation by the public is vital to the effective implementation of any contingency plan. Understanding of the basics of radiation protection as well as the contingency plan will help the public to appreciate the situation and react in a rational manner. A public education program to promote awareness of the contingency plan has been implemented in Hong Kong. In particular, a Virtual Exhibition Hall on radiation has been developed and launched in February 2002 for access by the public via Internet. A video and a set of web pages will be launched in the later part of 2002 to inform and educate the public on matters related to nuclear accident response in Hong Kong. This paper describes the public education programme in Hong Kong to promote public awareness and understanding of the nuclear contingency plan

  10. Implications of Contingency Planning Support for Weather and Icing Information

    Science.gov (United States)

    Vigeant-Langlois, Laurence; Hansman, R. John, Jr.

    2003-01-01

    A human-centered systems analysis was applied to the adverse aircraft weather encounter problem in order to identify desirable functions of weather and icing information. The importance of contingency planning was identified as emerging from a system safety design methodology as well as from results of other aviation decision-making studies. The relationship between contingency planning support and information on regions clear of adverse weather was investigated in a scenario- based analysis. A rapid prototype example of the key elements in the depiction of icing conditions was developed in a case study, and the implications for the components of the icing information system were articulated.

  11. 40 CFR 267.53 - Who must have copies of the contingency plan?

    Science.gov (United States)

    2010-07-01

    ... contingency plan? 267.53 Section 267.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.53 Who must have copies of the contingency plan? (a) You must maintain a copy of the plan with all revisions at the facility; and...

  12. 77 FR 76815 - Handling of Animals; Contingency Plans

    Science.gov (United States)

    2012-12-31

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service 9 CFR Parts 2 and 3 [Docket No. APHIS-2006-0159] RIN 0579-AC69 Handling of Animals; Contingency Plans AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Final rule. SUMMARY: We are amending the Animal Welfare Act...

  13. The Chalk River Nuclear Laboratories contingency plan -a brief description

    International Nuclear Information System (INIS)

    White, J.M.

    1982-01-01

    A brief description of the contingency plan which deals with both the on-site and off-site consequences of a serious nuclear accident is given. The off-site consequences of different size releases and the subsequent action taken by employees, radiation protection experts, municipal, Provincial and Federal authorities is described and the interaction of the various groups is discussed. (author)

  14. Radiological Contingency Planning for the Mars Science Laboratory Launch

    Energy Technology Data Exchange (ETDEWEB)

    Paul P. Guss

    2008-04-01

    This paper describes the contingency planning for the launch of the Mars Science Laboratory scheduled for the 21-day window beginning on September 15, 2009. National Security Technologies, LLC (NSTec), based in Las Vegas, Nevada, will support the U.S. Department of Energy (DOE) in its role for managing the overall radiological contingency planning support effort. This paper will focus on new technologies that NSTec’s Remote Sensing Laboratory (RSL) is developing to enhance the overall response capability that would be required for a highly unlikely anomaly. This paper presents recent advances in collecting and collating data transmitted from deployed teams and sensors. RSL is responsible to prepare the contingency planning for a range of areas from monitoring and assessment, sample collection and control, contaminated material release criteria, data management, reporting, recording, and even communications. The tools RSL has available to support these efforts will be reported. The data platform RSL will provide shall also be compatible with integration of assets and field data acquired with other DOE, National Space and Aeronautics and Space Administration (NASA), state, and local resources, personnel, and equipment. This paper also outlines the organizational structure for response elements in radiological contingency planning.

  15. Environmental aspects of contingency planning and spill response

    International Nuclear Information System (INIS)

    Hillman, S.O.

    1993-01-01

    Alyeska Pipeline Service Company has implemented an incident command system (ICS) for crisis management within the company for response to spills at all company facilities including the Valdez Marine Terminal. The system is also used by Alyeska acting as the initial response contractor for TAPS laden tankers within Prince William Sound. During the past three years, Alyeska has undertaken a complete review of the spill prevention and response plans for these areas. This poster session focuses on the environmental aspects of the response planning efforts. Information is available on contingency planning updates in the areas of dispersant use, burning as a response tool, bioremediation of marine oil spills, waste management, permitting, coastal resource and sensitive habitat data base, and wildlife protection and management. All of these subjects are addressed in the resource documents (RD) supplementing the contingency plans. The RD revisions have been a coordinated effort, involving operators, agencies, and the public through the citizen advisory group

  16. Proposed energy conservation contingency plan: emergency restrictions on advertising lighting. Authorities, need, rationale, and operation

    Energy Technology Data Exchange (ETDEWEB)

    1977-04-01

    The emergency restrictions on advertising lighting proposed in Energy Conservation Contingency Plan No. 5 of 1977 are presented. A statement is given on the need for rationale and operation of the Contingency Plan.

  17. Robustness via Run-Time Adaptation of Contingent Plans

    Science.gov (United States)

    Bresina, John L.; Washington, Richard; Norvig, Peter (Technical Monitor)

    2000-01-01

    In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.

  18. Defense plan of Hydro-Quebec for extreme contingencies

    International Nuclear Information System (INIS)

    Trudel, Guilles; Bernard, Serge; Portales, Esteban

    2000-01-01

    In the last years, Hydro-Quebec it undertook an important program to improve the dependability of their net of energy transport. They concentrated the efforts on increasing the capacity of the net resist in the event of carries to an extreme contingency caused in general by multiple incidents or for successive disconnection of the lines of energy transport. To neutralize these contingencies, Hydro-Quebec it adopted a series of special measures that are contained under the general title of Plan of Defense for Extreme Contingencies. The objective of this plan is to detect the incidents that surpass the capacity of the net. It is completely automatic and it is based mainly in: A system of automatic disconnection of generation and tele-shot of loads; A system of automatic maneuver (opening and closing) of inductances shunt of 735 kw; A system of disconnection of loads for low voltage; A system of disconnection of loads for low frequency. The present document summarizes the orientations that there is taking Hydro-Quebec to protect its net in the event of extreme contingencies and it describes the different automatism that they are adopts, in particular the system automatic disconnection of generation and tele-shot of loads (RPTC) that is one of the main components of the defense plan. The system RPTC detects the simultaneous loss of several lines directly in 15 substations of 735 kw. It understands four places of automatic disconnection of generation and a centralized system of tele-shot of loads

  19. Contingency planning for nuclear emergencies in Hong Kong

    International Nuclear Information System (INIS)

    Wong, M. C.

    2002-01-01

    Two nuclear power stations on the coast of southern China are situated some 50 kilometers to the northeast of Hong Kong. Although the stations are far away from Hong Kong, the construction and operation of the nuclear power stations have generated public anxiety locally, in particular, after the Chernobyl accident in 1986. A comprehensive contingency plan which takes into account such concerns of the public has been implemented in Hong Kong. This plan not only aims to ensure a quick and timely response to mitigate the health impact of any accidental release but also targets to re-assure the public that the territory is not contaminated when appropriate. This paper describes the principal elements of the nuclear contingency plan in Hong Kong, namely, an extensive environmental radiation monitoring programme and a proactive public communication programme

  20. 40 CFR 51.152 - Contingency plans.

    Science.gov (United States)

    2010-07-01

    ... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Prevention of Air Pollution Emergency... emission control actions to be taken at each episode stage. (Examples of emission control actions are set...: (1) Prompt acquisition of forecasts of atmospheric stagnation conditions and of updates of such...

  1. 10 CFR 72.186 - Change to physical security and safeguards contingency plans.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Change to physical security and safeguards contingency... contingency plans. (a) The licensee shall make no change that would decrease the safeguards effectiveness of... licensee safeguards contingency plan without prior approval of the Commission. A licensee desiring to make...

  2. 78 FR 53113 - Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency...

    Science.gov (United States)

    2013-08-28

    ...] Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency Measures for... California to address Clean Air Act nonattainment area contingency measure requirements for the 1997 annual... Air Act Requirements for Contingency Measures III. Review of the Submitted San Joaquin Valley PM 2.5...

  3. Environmental surveillance: An integral part of the spill contingency plan

    International Nuclear Information System (INIS)

    Salinas, J.; Bozzo, W.

    1993-01-01

    Typically, the initial response to spills is directed at containing, controlling, and stopping the flow of spilled materials. The primary goal of such a response is to limit the spread and further impact of spilled material, and to initiate timely cleanup and recovery of affected areas. Surveillance of actual spill impacts has often followed an after the fact approach, using only immediately available resources. Surveillance may occur quickly after a spill, but in most incidents its occurs as a follow-up action after initial response and containment have been achieved. Insufficient planning may produce spill surveillance that inadequately assesses impacts, fails to incorporate baseline data, and does not clearly identify a cleanup recovery and endpoint. The management and operations contractor for the US Dept. of Energy's Strategic Petroleum Reserve (SPR) conducts environmental surveillance activities in response to spill incidents when they occur at these facilities. These surveillance activities, when conducted as part of the response, are useful instruments in the initial assessment of spill incidents, management of spill response, containment, and cleanup activities, and for monitoring and documenting postspill impacts and recovery. An Environmental Surveillance Plan (ESP) incorporated in the SPR Spill Contingency Plan provides for initiation of environmental surveillance as part of the spill response. The ESP outlines, through alogic tree, conditions for activating the plan, key indicator parameters for evaluation, detailed methods for establishing surveillance stations, lists of key personnel, locations of equipment necessary to perform surveillance, and conditions for termination of environmental surveillance

  4. 75 FR 33747 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-06-15

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for... Notice of Intent to Delete the soils of Operable Unit 1 and the underlying ground water of the... National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Texas...

  5. 78 FR 16612 - National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public...

    Science.gov (United States)

    2013-03-18

    ... Hazardous Substances Pollution Contingency Plan (NCP) to broaden the technology, to include computer... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 300 [EPA-HQ-SFUND-2012-0738; FRL-9791-4] National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public Availability of the...

  6. 78 FR 73449 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-12-06

    ... Substances Pollution Contingency Plan (NCP). This partial deletion pertains to the soil of 1,154 residential...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the Omaha Lead Superfund Site AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...

  7. 76 FR 70105 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List: Partial...

    Science.gov (United States)

    2011-11-10

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Partial Deletion of the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State... property PINs listed above. The deletion of these two parcels from the Site affects all surface soils...

  8. 76 FR 45483 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-07-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for... Contingency Plan (NCP). The EPA and the State of Texas, through the Texas Commission on Environmental Quality... Notice of Deletion for SMPA Superfund Site without prior Notice of Intent for Deletion because EPA views...

  9. 78 FR 11620 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2013-02-19

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List: Deletion of the Kerr... Substances Pollution Contingency Plan (NCP). EPA and the State of Illinois, through the Illinois... because we view this as a noncontroversial revision and anticipate no adverse comment. We have explained...

  10. 78 FR 45905 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-30

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Craig... Substances Pollution Contingency Plan (NCP). The EPA and the Commonwealth of Pennsylvania, through the... Craig Farm Drum Superfund Site without prior Notice of Intent to Delete because we view this as a...

  11. 76 FR 45484 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-07-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... PBL Superfund Site without prior Notice of Intent for Deletion because EPA views this as a...

  12. 77 FR 43567 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-07-25

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Fort... Contingency Plan (NCP). The EPA and the State of New Jersey, through the NJ Department of Environmental... Intent to Delete because we view this as a noncontroversial revision and anticipate no adverse comment...

  13. 78 FR 69360 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-11-19

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial... and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of California... Corp Air Station Superfund Site without prior Notice of Intent for Partial Deletion because EPA views...

  14. 76 FR 18136 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-04-01

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Norwood... amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... we view this as a noncontroversial revision and anticipate no adverse comment. We have explained our...

  15. 76 FR 50441 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-15

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of New Jersey, through the New Jersey... Deletion of the Sayreville Landfill Superfund Site without prior Notice of Intent to Delete because we view...

  16. 78 FR 48844 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-08-12

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Mosley... National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Oklahoma... Deletion of the MRSL Superfund Site without prior Notice of Intent to Delete because we view this as a...

  17. 76 FR 20605 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2011-04-13

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). EPA and the State of Michigan, through the Michigan Department... Delete because we view this as a noncontroversial revision and anticipate no adverse comment. We have...

  18. 76 FR 70057 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-11-10

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Partial Deletion of the...). Refer to Figures 1 to 3 in the deletion docket to view the location of the two parcels being proposed... Substances Pollution Contingency Plan (NCP). This direct final partial deletion is being published by EPA...

  19. 75 FR 43115 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-07-23

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent to Partially..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... Intent for Partial Deletion because EPA views this as a noncontroversial revision and anticipates no...

  20. 75 FR 47521 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent...

    Science.gov (United States)

    2010-08-06

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent To Delete the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the... Corporation (Markhams) Superfund Site without prior notice of intent to delete because we view this as a...

  1. 78 FR 47267 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-08-05

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Contingency Plan (NCP). The EPA and the State of Oklahoma, through the Oklahoma Department of Environmental... without prior Notice of Intent to Delete because we view this as a noncontroversial revision and...

  2. 78 FR 66325 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-11-05

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of South Carolina, through the South... because we view this as a noncontroversial revision and anticipate no adverse comment. We have explained...

  3. 78 FR 60809 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-10-02

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). EPA and the State of New York, through the New York State... Deletion of the Site without prior Notice of Intent to Delete because EPA views this as a noncontroversial...

  4. 76 FR 51316 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-18

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Contingency Plan (NCP). The EPA and the Commonwealth of Puerto Rico, through the Puerto Rico Environmental... Site without prior Notice of Intent to Delete because we view this as a noncontroversial revision and...

  5. 78 FR 44512 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-24

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Sola... Pollution Contingency Plan (NCP). The EPA and the State of California, through the Regional Water Quality...., Inc. Superfund Site without prior Notice of Intent to Delete because we view this as a...

  6. 76 FR 32115 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-06-03

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent To Delete the... Substances Pollution Contingency Plan (NCP). The EPA and the State of Delaware, through the Delaware... Delete because EPA views this as a noncontroversial revision and anticipates no adverse comment. We have...

  7. 76 FR 81904 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-12-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Hipps..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... of Intent to Delete because we view this as a noncontroversial revision and anticipate no adverse...

  8. 75 FR 54821 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent...

    Science.gov (United States)

    2010-09-09

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent for Partial... amended, is an Appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... Superfund Site without prior Notice of Intent for Partial Deletion because EPA views this as a...

  9. 78 FR 45167 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-26

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Cannon... Substances Pollution Contingency Plan (NCP). The EPA and the State of Massachusetts, through the...), Superfund Site without prior Notice of Intent to Delete because we view this as a noncontroversial revision...

  10. 77 FR 67783 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2012-11-14

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the Waste... and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State of Michigan, through the...-Holland Lagoons Superfund Site without prior Notice of Intent to Delete because we view this as a...

  11. 78 FR 60721 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-10-02

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... final Notice of Deletion of the Ludlow Sand & Gravel Superfund Site (Site), located in the Town of Paris..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...

  12. Genesis Contingency Planning and Mishap Recovery: The Sample Curation View

    Science.gov (United States)

    Stansbery, E. K.; Allton, J. H.; Allen, C. C.; McNamara, K. M.; Calaway, M.; Rodriques, M. C.

    2007-01-01

    Planning for sample preservation and curation was part of mission design from the beginning. One of the scientific objectives for Genesis included collecting samples of three regimes of the solar wind in addition to collecting bulk solar wind during the mission. Collectors were fabricated in different thicknesses for each regime of the solar wind and attached to separate frames exposed to the solar wind during specific periods of solar activity associated with each regime. The original plan to determine the solar regime sampled for specific collectors was to identify to which frame the collector was attached. However, the collectors were dislodged during the hard landing making identification by frame attachment impossible. Because regimes were also identified by thickness of the collector, the regime sampled is identified by measuring fragment thickness. A variety of collector materials and thin films applied to substrates were selected and qualified for flight. This diversity provided elemental measurement in more than one material, mitigating effects of diffusion rates and/or radiation damage. It also mitigated against different material and substrate strengths resulting in differing effects of the hard landing. For example, silicon crystal substrates broke into smaller fragments than sapphire-based substrates and diamond surfaces were more resilient to flying debris damage than gold. The primary responsibility of the curation team for recovery was process documentation. Contingency planning for the recovery phase expanded this responsibility to include not only equipment to document, but also gather, contain and identify samples from the landing area and the recovered spacecraft. The team developed contingency plans for various scenarios as part of mission planning that included topographic maps to aid in site recovery and identification of different modes of transport and purge capability depending on damage. A clean tent, set-up at Utah Test & Training Range

  13. Year 2000 Contingency Planning and Cost Reporting at the Defense Finance and Accounting Service

    National Research Council Canada - National Science Library

    1998-01-01

    ...: complied with the requirements of the DoD Year 2000 Management Plan, prepared adequate Year 2000 system-level contingency plans, and reported complete and reliable Year 2000 system cost estimates...

  14. Oil spill contingency planning in the Ivory coast

    International Nuclear Information System (INIS)

    Bender, K.; Jensen, S.K.; Ostergaerd, J.; Nogbou, P.

    1993-01-01

    The administrative center in charge of handling oil spill pollution situations on the Ivory Coast, West Africa, is named Centre Ivoirien Antipollution (CIAPOL). Its organizational structure has been reshuffled recently. CIAPOL now has three divisions: a laboratory division, a division for cleaning up oil and chemical pollution at sea, and an administrative division. The risk for oil pollution is known: within the past ten years five spills have been reported. All of these have been connected to operations relating to the refinery in Abidjan. More than 2,000 ships call at the port of Abidjan every year. Minor oil slicks are found almost permanently in the harbor and the lagoons around the harbor. Lumps of tar are rather common on the beaches all along the country's coast. This paper focuses on the background investigation in sensitive areas and risk analysis that led to a revision of the oil spill contingency plan, Plan Pollumar, and the recent purchase of oil spill cleanup equipment. The creation of a regional oil pollution response center at CIAPOL for all of the countries in West Africa, is proposed

  15. Getting help quickly: older people and community worker perspectives of contingency planning for falls management.

    Science.gov (United States)

    Charlton, Kimberly; Murray, Carolyn M; Kumar, Saravana

    2018-01-01

    Older people living in the community need to plan for getting help quickly if they have a fall. In this paper planning for falls is referred to as contingency planning and is not a falls prevention strategy but rather a falls management strategy. This research explored the perspectives of older people and community workers (CWs) about contingency planning for a fall. Using a qualitative descriptive approach, participants were recruited through a community agency that supports older people. In-depth interviews were conducted with seven older people (67-89 years of age) and a focus group was held with seven workers of mixed disciplines from the same agency. Older people who hadn't fallen were included but were assumed to be at risk of falls because they were in receipt of services. Thematic analysis and concept mapping combined the data from the two participant groups. Four themes including preconceptions about planning ahead for falling, a fall changes perception, giving, and receiving advice about contingency plans and what to do about falling. Both CWs and older people agree contingency planning requires understanding of individual identity and circumstances. CWs have limited knowledge about contingency planning and may be directive, informative, or conservative. Implications for Rehabilitation Falls can result in serious consequences for older people. There is an evidence-practice gap as availability of and access to contingency planning does not necessarily mean older people will use it in a falls emergency. Older people prefer community workers to be directive or informative about contingency planning options but they do want choice and control. Increased community workers knowledge of, and collaborative decision-making about, contingency planning may promote patient-centered services and assist in closing the evidence-practice gap.

  16. Contingency planning for rapid reduction of greenhouse gas emissions

    Directory of Open Access Journals (Sweden)

    Larsson, Nils K.

    2010-03-01

    Full Text Available The current and predicted levels of greenhouse gas (GHG emissions are, according to the best international scientific estimates, leading the world towards climate change that will have serious consequences for all countries. The problem is aggravated by the tendency of people and institutions not to take action until catastrophic consequences emerge. The history of crises in other sectors show us that reactions are likely to focus on ad-hoc reactions or using plans that are readily available, with negative results. However, the alternative of developing public plans for drastic and rapid reductions is not likely to gain support because of their radical nature. The author therefore proposes that large organizations with direct or indirect control over substantial GHG emissions should prepare private contingency plans for very rapid reductions in emissions, so that more rational and less destructive plans will be available when the appropriate moment comes for last-minute action. Examples of the type of specific plans that may be appropriate are suggested.

    Según las estimaciones científicas internacionales más optimistas, los niveles actuales y previstos de emisiones de gases de efecto invernadero (GEI están llevando al mundo hacia un cambio climático que tendrá graves consecuencias para todos los países. El problema se ve agravado por la tendencia de personas e instituciones a no tomar medidas hasta que no se perciben las catastróficas consecuencias. El historial de crisis ocurridas en otros sectores nos demuestra que las reacciones probablemente se centren en medidas ad hoc o en emplear planes que ya existían, pero sin resultados. Sin embargo, es poco probable que la alternativa al desarrollo de planes públicos para las reducciones drásticas y rápidas consiga el apoyo necesario, debido precisamente a su radicalidad. El autor recomienda por tanto que las grandes organizaciones que tengan control directo o indirecto sobre un

  17. Power plant construction lead times: The value of contingency planning

    International Nuclear Information System (INIS)

    Rubin, L.J.

    1985-01-01

    In this paper an analysis of two different approaches to the construction of a major power plant (nuclear) is presented. The analysis compares an accelerated, ''go-for-broke'' strategy-which has some risk of being delayed-with a more deliberate contingency construction schedule in terms of revenue requirements and costs of electricity. It is demonstrated that under a wide variety of circumstances there are important advantages to the contingency strategy, but that the magnitude of those advantages is sensitive to the character of the power system being examined and to the flexibility of the contingency approach

  18. Contingency planning at the flotilla level in the United States Coast Guard Auxiliary: flotilla 81-a case study.

    Science.gov (United States)

    Schooley, Shawn Erik

    2013-01-01

    This article presents a case study of United States Coast Guard Auxiliary Flotilla 81. Flotilla 81 created its first formal, single agency contingency plan. The research question addressed is "How can a flotilla successfully develop a contingency plan?" Five emergent themes are identified. They are offered as suggested promising practices for other flotillas in need of creating a contingency plan. Findings suggest successful contingency planning is a result of effective collaboration with community partners. Network management theory is a key to an effective contingency planning process.

  19. Criteria for selection of fuel cycle and major materials licenses needing radiological contingency plans. Regulatory report

    International Nuclear Information System (INIS)

    Fisher, F.D.

    1981-07-01

    Quantities of NRC-licensed radioisotopes requiring the licensee to develop and submit radiological contingency planning information to the NRC for review and approval are developed and presented as limiting possession limits and conditions of possession

  20. 76 FR 56294 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List

    Science.gov (United States)

    2011-09-13

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental relations, Penalties... error in processing the direct- final rule. The online Federal Document Management System (FDMS) did not...

  1. 76 FR 56362 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List

    Science.gov (United States)

    2011-09-13

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... protection, Air pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental... processing the deletion notice. The online Federal Document Management System (FDMS) did not include required...

  2. 75 FR 44920 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-07-30

    ... State Registry of Inactive Hazardous Waste Disposal Sites as a ``Class 2 Inactive Hazardous Waste Site..., Chemicals, Hazardous waste, Hazardous substances, Intergovernmental relations, Natural resources, Oil... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the SMS...

  3. 76 FR 510 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-01-05

    ..., Intergovernmental relations, Penalties, Reporting and recordkeeping requirements, Superfund, Water pollution control... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... Site is located in Albuquerque, Bernalillo County, New Mexico. After this deletion, this 62 acres will...

  4. 120-D-1 (100-D) Ponds supplemental information to the Hanford Facility Contingency Plan. Revision 2

    International Nuclear Information System (INIS)

    Petersen, S.W.; Zoric, J.P.

    1997-06-01

    This document is a supplement to the Hanford Facility Contingency Plan and provides the unit-specific information needed to fully comply with the Washington Administrative Code 173-303 for contingency plans. The 100-D ponds are unlined surface impoundments that were mainly used to dispose of nondangerous wastewater, The ponds are designated as a single treatment, storage, and/or disposal unit because of potential corrosive characteristics of the wastewater. No waste is currently present at the 100-D Ponds

  5. Graded Approach to the Development of a Contingency Plan for On-Line Maintenance

    International Nuclear Information System (INIS)

    Chang, Hee Seung; Kim, Jung Wun; Song, Tae Young

    2012-01-01

    Many utilities perform preventive maintenance for safety systems during power operation to improve equipment reliability so as to focus on the work activities more easily and improve the quality of maintenance. Such a strategy can also reduce outage work activities, thus allowing resources to be utilized effectively. Preventive maintenance during power operation, known as on-line maintenance (OLM), requires an assessment and mitigation of risk, which can increase owing to out-of-service safety systems. One of the mitigation action plans is a contingency plan. EPRI recommends the development of a contingency plan for all planned system outages which include factors that strongly affect safety. The Korea Hydro and Nuclear Power Company (KHNP) undertook the preventive maintenance of the Essential Chilled Water System (ECWS) of a Westinghouse plant as a pilot OLM implementation. During the preparation of the work activities, a contingency plan was a pertinent issue during the discussions with regulators, especially regarding the scope and depth of the plan. This paper discusses the purpose of a contingency plan, including as examples some cases of US utilities, and proposes a graded approach to develop a contingency plan for OLM in consideration of the risks

  6. 202-S Hexone Facility supplemental information to the Hanford Facility Contingency Plan

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-03-01

    This document is a unit-specific contingency plan for the 202-S Hexone Facility and is intended to be used as a supplement to the Hanford Facility Contingency Plan. This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of WAC 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units. The 202-S Hexone Facility is not used to process radioactive or nonradioactive hazardous material. Radioactive, dangerous waste material is contained in two underground storage tanks, 276-S-141 and 276-S-142. These tanks do not present a significant hazard to adjacent facilities, personnel, or the environment. Currently, dangerous waste management activities are not being applied at the tanks. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 202-S Hexone Facility

  7. Standard format and content for radiological contingency plans for fuel cycle and materials facilities. Regulatory report

    International Nuclear Information System (INIS)

    1981-07-01

    This report is issued as guidance to those fuel cycle and major materials licensees who are required by the NRC to prepare and submit a radiological contingency plan. This Standard Format has been prepared to help assure uniformity and completeness in the preparation of those plans

  8. Unit-specific contingency plan for the 183-H solar evaporation basins. Revision 1

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1996-03-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H solar evaporation basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  9. Unit-specific contingency plan for the 183-H Solar Evaporation Basins. Revision 2

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1997-01-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  10. Unit-Specific Contingency Plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-04-01

    This document is a supplement to DOE/RL-93-75, 'Hanford Contingency Plan.' It provides the unit-specific information needed to fully comply with the Washington Administrative Code. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins were four concrete internal surfaces, which contained radiologically and hazardous contaminated waste. The 183-H Basin area is a final status treatment, storage, and disposal unit undergoing Resource Conservation and Recovery Act modified post- closure care

  11. 40 CFR 109.5 - Development and implementation criteria for State, local and regional oil removal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Development and implementation criteria for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection of...

  12. Application of Planned Behavior Theory to Account for College Students' Occupational Intentions in Contingent Employment

    Science.gov (United States)

    Huang, Jie-Tsuen

    2011-01-01

    The purpose of this study was to apply Ajzen's (1991) theory of planned behavior to examine college students' intentions to engage in contingent employment. Data were collected from 845 students in 8 colleges and universities in Taiwan. The results of structural equation modeling analyses indicated that both attitude and subjective norms were…

  13. 76 FR 11350 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-03-02

    ..., Reporting and recordkeeping requirements, Superfund, Water pollution control, Water supply. Dated: February... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... Mexico, from the National Priorities List (NPL). The NPL, promulgated pursuant to section 105 of the...

  14. 75 FR 55479 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-09-13

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... . SUPPLEMENTARY INFORMATION: The portion of the site to be deleted from the NPL is the surface media (soil... further actions. List of Subjects in 40 CFR Part 300 Environmental protection, Air pollution control...

  15. 77 FR 31215 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-05-25

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... the surface soil, unsaturated subsurface soil, surface water and sediments of Operable Unit (OU) 1...: The Environmental Protection Agency (EPA) Region 8 announces the deletion of Operable Unit (OU) 1--the...

  16. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    Science.gov (United States)

    2012-05-22

    common PREREQ 1 Walkable Streets yes Planning, Desi gn, Construction, OaM Medium use areas. Plan careft,j!y to accommodate simftar functions in the...apjly the specific LEED·ND criteria. Pay special attention to roads that connect LSA ~ife support areas) to common Walkable Streets yes Planning... Walkable Streets  Intent: ►To promote transportation efficiency. ►To promote walking by providing: • Safe •Appealing •Comfortable street

  17. Thinking ahead about reproductive health: contingency planning and emergency preparedness in crisis situations (Iraq and West Africa).

    Science.gov (United States)

    DeLargy, Pamela; Alakbarov, Ramiz

    2004-09-01

    The United Nations Population Fund (UNFPA) coordinated efforts to integrate RH into contingency planning for the 2003 Iraq crisis and the 2003 regional response for displaced populations in West Africa. Using UNFPA's network of country offices in the Middle East, staff developed logistics plans, conducted workshops and pre-positioned RH supplies. Though refugee movements did not occur, the contingency planning enhanced the response capacity of UNFPA offices and made it possible to rapidly provide assistance inside Iraq. In West Africa, multi-country workshops and follow-up resulted in country-level and regional action plans useful during the renewed crises of 2003; scarce funding, however, limited their full implementation. UNFPA's experiences show that contingency planning requires committing resources for crises, some of which will not occur; new staff skills; and follow-up. Moreover, RH is considered by some to be additional to the core elements of contingency planning. RH's political sensitivity, particularly with certain donors, further complicated integrated planning.

  18. The management of acute risks. Oil spill contingency planning and response

    International Nuclear Information System (INIS)

    Monk, D.C.; Cormack, D.

    1992-01-01

    It is clear that the risks of environmental damage can be best minimized by preventing oil spills from occurring at all. Since absolute prevention is unrealistic, however, early detection is essential and aerial surveillance techniques are of great value in this connection. If spills do occur, proper contingency planning and clean-up techniques can minimize impacts, but will rarely avoid them completely if the spilled oil reaches the coastline. It is evident that a main priority should be to prevent spilled oil reaching the coastline. The way in which oil spill response strategy is implemented is discussed in detail. It is based on four key elements: the allocation of responsibilities; contingency planning; training and exercises; regular audit of plans and response mechanisms. A case study of the oil spill strategy employed at the Sullom Voe oil terminal in Shetland is used as an illustration. (UK)

  19. Contingency plan for the Oak Ridge National Laboratory liquid low-level waste system

    International Nuclear Information System (INIS)

    DePaoli, S.M.; Ferrada, J.J.; Abraham, T.J.; Brown, C.H.; Lin, K.H.

    1989-12-01

    Oak Ridge National Laboratory (ORNL) is one of the major Department of Energy (DOE) facilities that performs various research and development (R ampersand D) activities. Liquid low-level waste (LLLW) is generated in the course of this work. The primary objective of this task is to develop specific plans of action to be implemented, in the event that the storage space for the LLLW concentrate should approach the minimum value in the operational flexibility range or a problem should develop concerning storage space available for dilute LLLW. This report considers contingency plans/options in the light of six different scenarios, including ''normal operation'' and five others. Evaluation and prioritization of the options were carried out separately for each case. Brief discussions of these scenarios and contingency plans/options are presented. 20 refs., 14 figs., 14 tabs

  20. Disaster and Contingency Planning for Scientific Shared Resource Cores.

    Science.gov (United States)

    Mische, Sheenah; Wilkerson, Amy

    2016-04-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores ("cores") to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution's overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy.

  1. Disaster and Contingency Planning for Scientific Shared Resource Cores

    Science.gov (United States)

    Wilkerson, Amy

    2016-01-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores (“cores”) to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution’s overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy. PMID:26848285

  2. A methodology to assist in contingency planning for protection of nuclear power plants against land vehicle bombs

    International Nuclear Information System (INIS)

    James, J.W.; Goldman, L.A.; Lobner, P.R.; Finn, S.P.; Koch, T.H.; Veatch, J.D.

    1989-04-01

    This report provides a methodology which could be used by operators of licensed nuclear power reactors to address issues related to contingency planning for a land vehicle bomb, should such a threat arise. The methodology presented in this report provides a structured framework for understanding factors to be considered in contingency planning for a land vehicle bomb including: (1) system options available to maintain a safe condition, (2) associated components and equipment, (3) preferred system options for establishing and maintaining a safe shutdown condition, and (4) contingency measures to preserve the preferred system options. Example applications of the methodology for a Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) are provided along with an example of contingency plan changes necessary for implementation of this methodology, a discussion of some contingency measures that can be used to limit land vehicle access, and a bibliography. 2 refs., 11 figs., 6 tabs

  3. Y2K compliance readiness and contingency planning.

    Science.gov (United States)

    Stahl, S; Cohan, D

    1999-09-01

    As the millennium approaches, discussion of "Y2K compliance" will shift to discussion of "Y2K readiness." While "compliance" focuses on the technological functioning of one's own computers, "readiness" focuses on the operational planning required in a world of interdependence, in which the functionality of one's own computers is only part of the story. "Readiness" includes the ability to cope with potential Y2K failures of vendors, suppliers, staff, banks, utility companies, and others. Administrators must apply their traditional skills of analysis, inquiry and diligence to the manifold imaginable challenges which Y2K will thrust upon their facilities. The SPICE template can be used as a systematic tool to guide planning for this historic event.

  4. Contingency plans for the ISEE-3 libration-point mission

    Science.gov (United States)

    Dunham, D. W.

    1979-01-01

    During the planning stage of the International Sun-Earth Explorer-3 (ISEE-3) mission, a recovery strategy was developed in case the Delta rocket underperformed during the launch phase. If a large underburn had occurred, the ISEE-3 spacecraft would have been allowed to complete one revolution of its highly elliptical earth orbit. The recovery plan called for a maneuver near perigee to increase the energy of the off-nominal orbit; a relatively small second maneuver would then insert the spacecraft into a new transfer trajectory toward the desired halo orbit target, and a third maneuver would place the spacecraft in the halo orbit. Results of the study showed that a large range of underburns could be corrected for a total nominal velocity deviation cost within the ISEE-3 fuel budget.

  5. The Peoples Liberation Army and Contingency Planning in China

    Science.gov (United States)

    2015-01-01

    protests; blocking traffic; or large-scale gatherings involving sporting events, commercial activities, or entertainment . During such events, the...holding large-scale exhibi- tions and cultural, sports , or other events. Recent examples where such plans appear to have been in place include the...pollution, and damage to the environment • public health incidents, which include epidemics, food safety and occu- pational hazards, animal diseases, and

  6. Standby Gasoline Rationing Plan. Contingency gasoline rationing regulations

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    The Economic Regulatory Administration issues final rules with respect to standby gasoline rationing. The plan is designed for and would be used only in the event of a severe gasoline shortage. The plan provides that eligibility for ration allotments will be primarily on the basis of motor vehicle registrations. DOE will mail government ration checks to the parties named in a national vehicle registration file to be maintained by DOE. Ration recipients may cash these checks for ration coupons at various designated coupon issuance points. Retail outlets and other suppliers will be required to redeem the ration coupons received in exchange for gasoline sold. Supplemental gas will be given to high-priority activities. A ration banking system will be established with two separate and distinct of ration accounts: retail outlets and other suppliers will open redemption accounts for the deposit of redeemed ration rights; and individuals or firms may open ration rights accounts, which will operate in much the same manner as monetary checking accounts. A white market will be permitted for the sale of transfer of ration rights. A percentage of the total ration rights to be issued will be reserved for distribution to the states as a State Ration Reserve, to be used by the states primarily for the relief of hardship. A National Ration Reserave will also be established. All sections of the Standby Gasoline Rationing Regulations are analyzed. (MCW)

  7. Sweden; Financial Sector Assessment Program Update: Technical Note on Contingency Planning, Crisis Management and Bank Resolution

    OpenAIRE

    International Monetary Fund

    2011-01-01

    This abstract reviews the recommendations made in the FSAP Update for Sweden in the areas of contingency planning, crisis management, and bank resolution. Although Sweden crisis management fared well during the global financial crisis, its authorities are reviewing the framework for managing financial crises to incorporate crisis lessons. They recommend a domestic institutional framework, an effective cross-border cooperation, an emergency liquidity assistance (ELA), a deposit guarantee schem...

  8. Oil spill contingency planning for offshore oil fields - a new concept established for the Norwegian continental shelf

    International Nuclear Information System (INIS)

    Singsaas, I.; Reed, M.; Nygaard, T.; Sundnes, G.Jr.

    1998-01-01

    The development of a new concept for oil spill contingency planning to be used for offshore oil fields on the Norwegian continental shelf was discussed. The factors which are important in developing a good oil spill contingency plan include a good understanding of: (1) the fate, behaviour and weathering of the specific oil, (2) relevant oil spill scenarios, (3) drift and spreading of the oil, and (4) specific requirements for the effectiveness of the chosen response options. The oil spill contingency and response (OSCAR) model was used for quantitative comparison of alternative response options. 21 refs., 2 tabs., 7 figs

  9. 190-C Facility <90 Day Storage Pad supplemental information to the Hanford facility contingency plan

    International Nuclear Information System (INIS)

    Little, N.C.

    1996-12-01

    The 190-C Facility <90 Day Storage Pad stores waste oils primarily contaminated with lead generated while draining equipment within the building of residual lubricating oils. Waste oils are packaged and stored in fifty-five gallon drums, or other containers permitted by the Site Specific Waste Management Instruction. Bechtel Hanford, Inc. (BHI) manual BHI-EE-02, Environmental Requirements Procedures, references this document. This document is to be used to demonstrate compliance with the contingency plan requirements in Washington Administrative Code, Chapter 173-303, Dangerous Waste Regulations, for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units (units). Refer to BHI-EE-02, for additional information

  10. Proposed energy conservation contingency plan: emergency restrictions on illuminated advertising and certain gas lighting. Economic impact analysis. Environmental impact assessment. Contingency plan No. 5

    Energy Technology Data Exchange (ETDEWEB)

    1976-09-01

    In the event of a severe energy supply disruption or in order to fulfill obligations of the U.S. under the International Energy Program, the President may implement one or more energy conservation contingency plans provided for in the Energy Policy and Conservation Act (EPCA) of 1975. This report describes the economic impact of restrictions on the use of illuminated advertising and certain gas lighting. The proposed plan would reduce demand for electricity and natural gas. The reduced demand for electricity would result in reduced demand for oil, natural gas, and other fuels used to generate electricity. Since oil and natural gas would be in short supply, the reduced use of these fuels in the generation of electricity could make supplies available to other industries. By contrast, the coal supply would not be affected by these conditions. However, the substitutability of coal for fuels in short supply (especially oil for electric generation) would tend to offset the impact of reduced demand for coal to generate electricity. Advertising expenditures would shift. Expenditures for illuminated outdoor signs would fall and expenditures for advertising in other media (e.g., radio, newspapers) would rise. No significant effect upon aggregate retail sales is anticipated. In summary, microeconomic effects of the measure are negligible and all effects are minor and/or beneficial. These effects are almost lost in the projected economic effects that would result from any severe supply interruption.

  11. Australian contingency plans for emergency animal disease control: the role of antigen/vaccine banks.

    Science.gov (United States)

    Tweddle, N E

    2004-01-01

    Vaccination is an important element of contingency plans for many animal diseases. The decision whether or not to use vaccine is complex, and must consider epidemiological, economic and social issues. Vaccines are rarely available in a country for emergency animal diseases unless a low pathogenicity strain of the agent is present or it is localised in carrier hosts. High quality commercial vaccine from overseas is often the preferred source of vaccine in an emergency, although less reliable sources may be used with additional safeguards. Alternatively, master seeds may be imported or developed for production within the country For contingency planning, diseases may be ranked according to the expected role of vaccine in the disease eradication strategy, with diseases for which vaccine is part of the initial response strategy receiving highest priority for action. A range of preparedness options is available, ranging from identifying producers of vaccine, obtaining permits for import and use from regulatory authorities, to establishing vaccine or antigen banks. Countries need to consider their individual situations and develop strategies to address the diseases of significance to them.

  12. 77 FR 30266 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford...

    Science.gov (United States)

    2012-05-22

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford Federal Direct Loan Program AGENCY: Federal Student Aid, Department of Education... announces the annual updates to the ICR plan formula for 2012. Under the William D. Ford Federal Direct Loan...

  13. 77 FR 20796 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford...

    Science.gov (United States)

    2012-04-06

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford Federal Direct Loan Program AGENCY: Federal Student Aid, Department of Education... announces the annual updates to the ICR plan formula for 2011. Under the William D. Ford Federal Direct Loan...

  14. A High Performance System With Explicit Incorporation of ATC Regulations to Generate Contingency Plans for UAVs with Lost Communication, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose a comprehensive and systematic contingency plan generation framework to deal with lost communication in UAVs. ATC regulations are explicitly incorporated...

  15. Contingency planning for oil spill response: A program of joint IMO/oil industry regional seminars

    International Nuclear Information System (INIS)

    Bavister, R.; Wonham, J.

    1993-01-01

    Cooperative efforts between the oil industry and governments at the national and local levels have resulted in a series of reports for both technical and general audiences on subjects relating to oil spills, as well as an ongoing series of government/industry regional seminars for senior executives. The seminars emphasize the crucial importance of joint government/industry attention to contingency planning. These activities, which are continuing, are organized under the auspices of an International Petroleum Industry Environmental Conservation Association working group, and the International Maritime Organization. Feedback is solicited from seminar participants for use in planning further seminars and to give the IMO a clear picture of follow up activities that have resulted from the seminars

  16. Contingency plan for the Lawrence Livermore National Laboratory, Site 300, hazardous waste operations

    International Nuclear Information System (INIS)

    Gonzalez, M.A.

    1983-01-01

    This contingency plan for hazardous waste release provides guidance for coordinating response efforts. With a goal to minimize hazards to human health and life; and protect livestock, wildlife, the environment, and property in the event of a fire, explosion, or any unplanned release of hazardous substances or mixtures to the air, water, or soil. In this document, hazardous waste includes all waste substances or mixtures that: contain any of the hazardous substances listed in the Resource Conservation and Recovery Act; have the characteristic of being toxic, flammable, reactive, corrosive, an irritant, and/or a strong sensitizer; are radioactive and are used in experiments at Site 300; or could have a significant effect on the environment. This Plan includes an overview of emergency response capabilities; and responsibilities assigned to both LLNL and non-LLNL emergency response personel

  17. Contingency plan for deployment of the void fraction instrument in Tank 241-AY-102

    International Nuclear Information System (INIS)

    CONNER, J.M.

    1999-01-01

    High-heat producing sludge from tank 241-C-106 will be sluiced and transferred to tank 241-AY-102 beginning in October 1998. Safety analyses have postulated that after retrieval, the waste in 241-AY-102 may generate and retain unsafe levels of flammable gases (Noorani 1998, Pasamebmetoglu etal. 1997). Unsafe levels of retained gas are not expected, but cannot be ruled out because of the large uncertainty in the gas generation and retention rates. The Tank Waste Remediation System Basis for Interim Operation (Noorani 1998) identifies the need for a contingency plan to add void fraction monitoring to tank 241-AY-102 within 2 weeks of the identification of flammable gas buildup that would warrant monitoring. The Tank 241-C-106 Waste Retrieval Sluicing System Process Control Plan (Carothers et al. 1998) committed to providing a contingency plan for deployment of the void fraction instrument (VFI) in tank 241-AY-102. The VFI determines the local void fraction of the waste by compressing a waste sample captured in a gas-tight test chamber. The sample chamber is mounted on the end of a 76-cm (2.5-ft) arm that can be rotated from vertical to horizontal when the instrument is deployed. Once in the waste, the arm can be positioned horizontally and rotated to sample in different areas below the riser. The VFI is deployed using a crane. The VFI has been deployed previously in 241-AW, 241-AN, and 241-SY tank farms, most recently in tank 241-SY-101 in June and July 1998. An additional test in tank 241-SY-101 is planned in September 1998. Operating instructions for the VFI are included in the Void Fraction Instrument Operation and Maintenance Manual (Pearce 1994)

  18. State-of-the-art risk-based approach to spill contingency planning and risk management

    International Nuclear Information System (INIS)

    Schmidt Etkin, Dagmar; Reilly, Timothy; French McCay, Deborah

    2011-01-01

    The paper proposes incorporating a comprehensive examination of spill risk into risk management and contingency planning, and applying state-of-the-art modeling tools to evaluate various alternatives for appropriate spill response measures and optimize protective responses. The approach allows spill contingency planners and decision-makers to determine the types of spill scenarios that may occur in a particular location or from a particular source and calculate the probability distribution of the various scenarios. The spill probability information is useful in assessing and putting into perspective the various costs options for spill control systems that will be recommended ultimately. Using advanced modeling tools helps in estimating the potential environmental and socioeconomic consequences of each spill scenario based on location-specific factors over a range of stochastic possibilities, simulating spill scenarios and determining optimal responses and protection strategies. The benefits and costs of various response alternatives and variations in response time can be calculated and modeling tools for training and risk allocation/transfer purposes used.

  19. Effective communications system for a national oil spill contingency plan in Nigeria

    International Nuclear Information System (INIS)

    Adeyemi-Wilson, O.A.

    1991-01-01

    This paper describes what constitute an Effective Communications System for a National Oil Spill Contingency Plan. It discusses the system available in Nigeria for the oil exploration and producing companies, the Nigerian National Petroleum Corporation (NNPC) and the only oil spill response cooperative, the Clean Nigeria Associates (CNA). The Emergency Communications System which the companies had in place for some time, but is no longer functioning because of bureaucratic problems, is mentioned. The paper also mentioned the need to integrate the various separate systems already in use to provide effective communication for proper oil spill response. It recognizes the need for support from the Ministry of Communications and the two government agencies, NITEL and NET which provide telephone services in Nigeria. A proposed Effective Communications System for Nigeria is described

  20. 78 FR 33395 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013-William D. Ford...

    Science.gov (United States)

    2013-06-04

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013--William D. Ford Federal Direct Loan Program Catalog of Federal Domestic Assistance (CFDA) Number... free, at 1- 800-877-8339. SUPPLEMENTARY INFORMATION: Under the William D. Ford Federal Direct Loan...

  1. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Paulo Roberto Werneck de, E-mail: paulo@pwerneck.com [Universidade Federal Fluminense (UFF), Angra dos Reis, RJ (Brazil); Hora, Antonio Ferreira da, E-mail: dahora@vm.uff.br [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2015-07-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  2. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    International Nuclear Information System (INIS)

    Carvalho, Paulo Roberto Werneck de; Hora, Antonio Ferreira da

    2015-01-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  3. Analysis of the Contingency Contracting Support Plan within the Joint Planning Process Framework

    National Research Council Canada - National Science Library

    Anderson, Michael

    2003-01-01

    ...) flexibility and responsiveness. Current OPLANS at the Joint-level generally discuss how forces will be contractually supported in-theater, but are not specific enough within the framework of the Joint Planning Process (JPP...

  4. Contingency plan improvement for managing oil spills in the coastal waters of Thailand.

    Science.gov (United States)

    Singkran, Nuanchan

    2014-12-15

    The estimated risks of being impacted by oil spills in the coastal waters were used to improve the oil spill contingency plan of Thailand. Functional roles of local agencies are integrated into the plan. Intensive measures are suggested for the coastal provinces located in high-very high risk zones, whereas light and moderate measures are suggested for the coastal provinces located in low and moderate risk zones, respectively. The estimated percentage risks due to simulated oil slicks hitting the coast and/or important resources (PRoilspill) were used to guide the year-round water activities that should be carefully handled at a certain radius with a low-moderate PRoilspill, whereas they should be avoided at a certain radius with a high-very high PRoilspill. Important measures before, during, and post periods of an oil spill incident are suggested to prevent and monitor oil spill incidents and mitigate their impacts on the environment. Copyright © 2014 Elsevier Ltd. All rights reserved.

  5. Contingency planning for electronic health record-based care continuity: a survey of recommended practices.

    Science.gov (United States)

    Sittig, Dean F; Gonzalez, Daniel; Singh, Hardeep

    2014-11-01

    Reliable health information technology (HIT) in general, and electronic health record systems (EHRs) in particular are essential to a high-performing healthcare system. When the availability of EHRs are disrupted, alternative methods must be used to maintain the continuity of healthcare. We developed a survey to assess institutional practices to handle situations when EHRs were unavailable for use (downtime preparedness). We used literature reviews and expert opinion to develop items that assessed the implementation of potentially useful practices. We administered the survey to U.S.-based healthcare institutions that were members of a professional organization that focused on collaboration and sharing of HIT-related best practices among its members. All members were large integrated health systems. We received responses from 50 of the 59 (84%) member institutions. Nearly all (96%) institutions reported at least one unplanned downtime (of any length) in the last 3 years and 70% had at least one unplanned downtime greater than 8h in the last 3 years. Three institutions reported that one or more patients were injured as a result of either a planned or unplanned downtime. The majority of institutions (70-85%) had implemented a portion of the useful practices we identified, but very few practices were followed by all organizations. Unexpected downtimes related to EHRs appear to be fairly common among institutions in our survey. Most institutions had only partially implemented comprehensive contingency plans to maintain safe and effective healthcare during unexpected EHRs downtimes. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  6. [Scientific basis of environmental health contingency planning for a coastal oil spill].

    Science.gov (United States)

    Kim, Young Min; Cheong, Hae Kwan; Kim, Jong Ho; Kim, Jong Hun; Ko, Kumsook; Ha, Mina

    2009-03-01

    This study presents a scientific basis for the establishment of an environmental health contingency plan for dealing with accidental coastal oil spills and suggests some strategies for use in an environmental health emergency. We reviewed the existing literature, and analyzed the various fundamental factors involved in response strategies for oil spill. Our analysis included data derived from Hebei Spirit oil spill and used air dispersion modeling. Spill amounts of more than 1,000 kl can affect the health of residents along the coast, especially those who belong to vulnerable groups. Almost 30% of South Korean population lives in the vicinity of the coast. The area that is at the highest risk for a spill and that has the greatest number of people at risk is the stretch of coastline from Busan to Tongyeong. The most prevalent types of oil spilt in Korean waters have been crude oil and bunker-C oil, both of which have relatively high specific gravity and contain volatile organic compounds, polycyclic aromatic hydrocarbons, and metals. In the case of a spill of more than 1,000 kl, it may be necessary to evacuate vulnerable and sensitive groups. The government should establish environmental health planning that considers the spill amount, the types of oil, and the distance between the spot of the accident and the coast, and should assemble a response team that includes environmental health specialists to prepare for the future oil spill.

  7. A guide to contingency planning for oil spills on water. V. 2

    International Nuclear Information System (INIS)

    1997-01-01

    The movement of oil from the dominant production centres of the world to the world-wide market is primarily achieved by the use of tankers and pipelines. The global pattern of marine transport is well established as shown in Figure 1, below. While the environmental priority for all tanker operations is the prevention of spills, it is recognized that marine spills are a factor for which management must plan. This report, which is prepared for those managements in industry and government, describes the elements of the contingency planning process. It stresses the importance of cooperative activity between industry and government. It presents a consensus view of the IPIECA membership which is representative of the international oil industry. It reflects current informed thinking in the light of the extensive individual company and industry organization reviews that have taken place since the Exxon Valdez and other major incidents in 1989/90. This report has drawn freely on many of these reviews, some of which have been published. (UK)

  8. ANALISIS SENSITIVITAS LINGKUNGAN OSCP (OIL SPILL CONTINGENCY PLAN DI PESISIR SELATAN DELTA MAHAKAM, PROVINSI KALIMANTAN TIMUR

    Directory of Open Access Journals (Sweden)

    Mursalin Mursalin

    2014-07-01

    Full Text Available The research was one part of oil spill contingency plan (OSCP developed for Delta Mahakam area, where oil & gas exploration and exploitation linked with rich biodiversity supporting coastal community livelihood. Environmental sensitivity  analysis for OSCP only do two early stages of OSCP scope, which integrated with the dangers of coastal vulnerability. This analysis mapped environmental component from oil pollution become sensitivity rangking as an effort to support response development strategies and priorities for the coastal resources protection. The aims of this research were (1 to establish environment sensitivity rank and (2 to identify primary factor supporting the environmental sensitivity for OSCP in south Delta Mahakam area. The result of analysis showed environmenal sensitivity was 62.37% (517.52 km, its mean very high sensitivity. Then the high sensitivity criteria was 11.31% (94 km. The criteria of medium sensitivity was 11.92% (99 km. While for low sensitivity and very low sensitivity respectively were 1.78% (15 km and 12.64% (105 km. Based on Principal Component Analysis (PCA, 36.01%  variability was explained by axis of factor 1. The others variability 18.53% and 13.93% were explained by axis of the factor 2 and factor 3. Axis of factor 1 for coastal exposure (EK, oil residence index (OR, coastal type (TP, and biological resources (SH had a quite large linear combinations coefficient, amounted to 0.94 (EK&OR, 0.83 (TP and 0.75 (SH. This indicated a very high contribution for environmental sensitivity OSCP level drafting. On axis of factor 2, the linear coeffisien combinations for the resource utilization of port (PL was 0.83 and settlement (PM was 0.85. Axis of factor 3 contributed 0.75 and 0.66 on migas platform (PO and placement of passive fishing gear/catchment area (AT. However, the utilization of coastal resources for PL, PM, PO and AT were on axis of factor 2 and factor 3 had a considerable distance with its SI variable

  9. Neither snow nor rain: contingency planning by a clinical reference laboratory courier service for weather related emergencies.

    Science.gov (United States)

    Bankson, Daniel D; Heim, Joseph A

    2014-01-01

    To optimize transportation processes, we present herein a contingency plan that coordinates interim measures used to ensure continued and timely services when climate based events might cause an interruption of the usual specimen transportation processes. As an example, we outline the implementation and effectiveness of a contingency plan for network laboratory courier automobile transportation during times of mountain pass highway closure. Data available from an approximately 3-year period from October 10, 2010 through August 29, 2013 revealed a total of 690 complete closures in the eastbound or westbound lanes of the Interstate-90 highway in the Snoqualmie Pass area in the state of Washington. Despite the frequency of closures, the Washington State Department of Transportation was effective in limiting the duration of closures. Road closures of less than 1 hour accounted for 58.7% of the total closures. No recorded closures prevented dispatched couriers from completing a prescheduled Snoqualmie Pass route. We identified no delays as being clinically significant, despite that there were 5 instances of delays greater than 4 hours. We implemented a contingency plan of aiding courier logistics during all times of pass closure. The plan includes an easy to interpret Condition Dashboard as a status indicator and a Decision Tree that references and summarizes information. Overall, the contingency plan allows for an objective, robust, proactive decision support system that has enabled operational flexibility and has contributed to continued safe, on-time specimen transportation; clients and courier and reference laboratory staff have appreciated these features and associated outcomes. Copyright© by the American Society for Clinical Pathology (ASCP).

  10. 216-A-29 Ditch supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-29 Ditch and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-A-29 Ditch is a surface impoundment that received nonregulated process and cooling water and other dangerous wastes primarily from operations of the Plutonium/Uranium Extraction Plant. Active between 1955 and 1991, the ditch has been physically isolated and will be closed. Because it is no longer receiving discharges, waste management activities are no longer required at the unit. The ditch does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 216-A-29 Ditch

  11. 216-U-12 Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-U-12 Crib and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-U-12 Crib is a landfill that received waste from the 291-U-1 Stack, 244-WR Vault, 244-U via tank C-5, and the UO 3 Plant. The crib pipeline was cut and permanently capped in 1988, and the crib has been backfilled. The unit will be closed under final facility standards. Waste management activities are no longer required at the unit. The crib does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 216-U-12 Crib

  12. 216-A-36B Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-36B Crib and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-A-36B Crib is a landfill that received ammonia scrubber waste from the 202-A Building (Plutonium/Uranium Extraction Plant) between 1966 and 1972. In 1982, the unit was reactivated to receive additional waste from Plutonium/Uranium Extraction operations. Discharges ceased in 1987, and the crib will be closed under final facility standards. Because the crib is not receiving discharges, waste management activities are no longer required. The crib does not present a significant hazard to adjacent units, personnel, or the environment. There is little likelihood that any incidents presenting hazards to public health or the environment would occur at the 216-A-36B Crib

  13. Nonradioactive Dangerous Waste Landfill supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the Nonradioactive Dangerous Waste Landfill and is intended to be used as a supplement to DOE/RL-93-75, 'Hanford Facility Contingency Plan.' This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173-303 for certain Resource, Conservation and Recovery Act of 1976 waste management units. The Nonradioactive Dangerous Waste Landfill (located approximately 3.5 miles southeast of the 200 East Area at the Hanford Site) was used for disposal of nonradioactive dangerous waste from January 1975 to May 1985. Currently, there are no dangerous waste streams disposed in the Nonradioactive Dangerous Waste Landfill. Dangerous waste management activities are no longer required at the landfill. The landfill does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that incidents presenting hazards to public health or the environment would occur at the Nonradioactive Dangerous Waste Landfill

  14. 105-DR Large Sodium Fire Facility Supplemental Information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-05-01

    This document is a unit-specific contingency plan for the 105-DR Large Sodium Fire Facility and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of Washington Administrative Code (WAC) 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units.The LSFF occupied the former ventilation supply fan room and was established to provide a means of investigating fire and safety aspects associated with large sodium or other metal alkali fires. The unit was used to conduct experiments for studying the behavior of molten alkali metals and alkali metal fires. This unit had also been used for the storage and treatment of alkali metal dangerous waste. Additionally, the Fusion Safety Support Studies programs sponsored intermediate-size safety reaction tests in the LSFF with lithium and lithium-lead compounds. The LSFF, which is a RCRA site, was partially clean closed in 1995 and is documented in 'Transfer of the 105-DR Large Sodium Fire Facility to Bechtel Hanford, Inc.' (BHI 1998). In summary, the 105-DR supply fan room (1720-DR) has been demolished, and a majority of the surrounding soils were clean-closed. The 117-DR Filter Building, 116-DR Exhaust Stack, 119- DR Sampling Building, and associated ducting/tunnels were not covered under this closure

  15. Contingency plans and successful response strategies for oil spills into rivers

    Energy Technology Data Exchange (ETDEWEB)

    Owens, Edward H. [Polaris Applied Sciences Inc., Bainbridge Island, WA (United States)]. E-mail: ehowens@polarisappliedsciences.com

    2003-07-01

    Oil spilled into a river enters a dynamic environment. An effective response can only succeed if the dynamics of the river system are understood and if the strategies and tactics are designed to match these conditions. Oil is transported downstream at the speed of the current, therefore, an estimate of the rate of movement is essential to identify effective intercept locations. Boom performance is affected by local surface water velocities as entrainment of oil typically begins when velocities exceed 0.4 m/s. However, boom configurations can be effective in current velocities as great as 2.5 m/s. Response operations can be successful if staging or control locations have been identified as part of contingency planning and if booms are deployed to take into account local surface current characteristics. Tracking and control of submerged or sunken oil is difficult and may not be practical. Recovery operations for sunken oil depend on the channel depth, current velocities, and on the distribution and concentration of the oil. (author)

  16. Using contingent choice methods to assess consumer preferences about health plan design.

    Science.gov (United States)

    Marquis, M Susan; Buntin, Melinda Beeuwkes; Kapur, Kanika; Yegian, Jill M

    2005-01-01

    American insurers are designing products to contain health care costs by making consumers financially responsible for their choices. Little is known about how consumers will view these new designs. Our objective is to examine consumer preferences for selected benefit designs. We used the contingent choice method to assess willingness to pay for six health plan attributes. Our sample included subscribers to individual health insurance products in California, US. We used fitted logistic regression models to explore how preferences for the more generous attributes varied with the additional premium and with the characteristics of the subscriber. High quality was the most highly valued attribute based on the amounts consumers report they are willing to pay. They were also willing to pay substantial monthly premiums to reduce their overall financial risk. Individuals in lower health were willing to pay more to reduce their financial risk than individuals in better health. Consumers may prefer tiered-benefit designs to those that involve overall increases in cost sharing. More consumer information is needed to help consumers better evaluate the costs and benefits of their insurance choices.

  17. A new wave-current online information system for oil spill contingency planning (WAVCIS)

    International Nuclear Information System (INIS)

    Stone, G.W.

    2001-01-01

    A Wave Current Information System (WAVCIS) for coastal Louisiana was presented. WAVCIS is an online oceanographic and meteorological observing system that provides many benefits to oil spill contingency planning. The system provides wave information such as wave height, period, direction of propagation, water level, surge, water column velocity profiles and meteorological conditions on a near real time basis. The information is gathered from several stations along Louisiana's coast in the Gulf of Mexico and is transmitted via cellular satellite telephone to a base station at Louisiana State University where it is then made available on the Internet. The database provides information regarding emergency response decision tools for agencies faced with decision making during storm threats or during coordination of an oil spill response operation. It also provides information needed for assisting operations support for offshore industries, commerce and trade. In addition, it can be used to obtain input boundary conditions for numerical modelling of surface and underwater oil and gas or mixtures of oil and gas. It was concluded that WAVCIS provides several benefits, including better cursory assessment of oil spill migration, precision numerical modeling of casts for oil spill trajectories, an important archived data set to assess trajectory modeling, and real-time environmental conditions for vessel operators using dispersants and in situ burning methods. 3 refs., 17 figs

  18. When a disaster strikes without warning: how effective is your response plan?

    Science.gov (United States)

    Steiner, P J

    2001-01-01

    When an outside high-pressure natural gas line was cut near the intakes to a hospital's ventilation system, gas was quickly dispersed throughout the building. The facility's disaster management plan faced a real-life test.

  19. Plan to build lab in mine aims to strike scientific gold

    CERN Multimedia

    Mercer, B

    2004-01-01

    Article describing plans to build a neutrino research laboratory in the Homestake gold mine in South Dakota. Assuming that the funding comes through, the timetable calls for construction work inside the mine to start in 2006, with the first detector equipment for experiments installed from 2007 to 2009 (1 page).

  20. Real-time laboratory exercises to test contingency plans for classical swine fever: experiences from two national laboratories.

    Science.gov (United States)

    Koenen, F; Uttenthal, A; Meindl-Böhmer, A

    2007-12-01

    In order to adequately and efficiently handle outbreaks of contagious diseases such as classical swine fever (CSF), foot and mouth disease or highly pathogenic avian influenza, competent authorities and the laboratories involved have to be well prepared and must be in possession of functioning contingency plans. These plans should ensure that in the event of an outbreak access to facilities, equipment, resources, trained personnel, and all other facilities needed for the rapid and efficient eradication of the outbreak is guaranteed, and that the procedures to follow are well rehearsed. It is essential that these plans are established during 'peace-time' and are reviewed regularly. This paper provides suggestions on how to perform laboratory exercises to test preparedness and describes the experiences of two national reference laboratories for CSF. The major lesson learnt was the importance of a well-documented laboratory contingency plan. The major pitfalls encountered were shortage of space, difficulties in guaranteeing biosecurity and sufficient supplies of sterile equipment and consumables. The need for a standardised laboratory information management system, that is used by all those involved in order to reduce the administrative load, is also discussed.

  1. Resource Estimations in Contingency Planning for Foot-and-Mouth Disease

    Directory of Open Access Journals (Sweden)

    Anette Boklund

    2017-05-01

    Full Text Available Preparedness planning for a veterinary crisis is important to be fast and effective in the eradication of disease. For countries with a large export of animals and animal products, each extra day in an epidemic will cost millions of Euros due to the closure of export markets. This is important for the Danish husbandry industry, especially the swine industry, which had an export of €4.4 billion in 2012. The purposes of this project were to (1 develop an iterative tool with the aim of estimating the resources needed during an outbreak of foot-and-mouth disease (FMD in Denmark, (2 identify areas, which can delay the control of the disease. The tool developed should easily be updated, when knowledge is gained from other veterinary crises or during an outbreak of FMD. The stochastic simulation model DTU-DADS was used to simulate spread of FMD in Denmark. For each task occurring during an epidemic of FMD, the time and personnel needed per herd was estimated by a working group with expertise in contingency and crisis management. By combining this information, an iterative model was created to calculate the needed personnel on a daily basis during the epidemic. The needed personnel was predicted to peak within the first week with a requirement of approximately 123 (65–175 veterinarians, 33 (23–64 technicians, and 36 (26–49 administrative staff on day 2, while the personnel needed in the Danish Emergency Management Agency (responsible for the hygiene barrier and initial cleaning and disinfection of the farm was predicted to be 174 (58–464, mostly recruits. The time needed for surveillance visits was predicted to be the most influential factor in the calculations. Based on results from a stochastic simulation model, it was possible to create an iterative model to estimate the requirements for personnel during an FMD outbreak in Denmark. The model can easily be adjusted, when new information on resources appears from management of other crisis or

  2. 14 CFR 259.4 - Contingency plan for lengthy tarmac delays.

    Science.gov (United States)

    2010-01-01

    ... (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS ENHANCED PROTECTIONS FOR AIRLINE PASSENGERS § 259.4 Contingency..., assurance that the air carrier will provide adequate food and potable water no later than two hours after... flights covered in paragraph (b)(2) of this section, and for the trigger point for food and water covered...

  3. Development of a unified federal/state coastal/inland oil and hazardous substance contingency plan for the state of Alaska

    International Nuclear Information System (INIS)

    Lautenberger, C.; Pearson, L.

    1993-01-01

    Passage of the US Oil Pollution Act (OPA) of 1990 expanded the existing federal planning and response framework in several ways. The OPA created a new requirement for facility and tank vessel response plans and creates an area-level planning and coordination structure to help supplement federal, regional, and local planning efforts. The OPA amended the existing Clean Water Act's section 311(j)(4), which establishes area committees and area contingency plans as primary components of this structure. In 1980, the Alaska legislature enacted legislation which defines the state's policies regarding oil spills. Following the 1989 Exxon Valdez spill, additional legislation was passed to expand and strengthen the state's oil spill program. Specifically, in 1989 the Senate Bill 261 required the Alaska Department of Environmental Conservation to develop, annually review, and revise the State Oil and Hazardous Substance Contingency Plans (State Master and Regional Plans). State regional plans serve as annexes to the State Master Plan. The coordinated and cooperative efforts by government agencies and local entities toward creating a unified federal/state, coastal/inland Oil and Hazardous Substance Contingency Plan are presented, along with the development and progress of unified area/regional contingency plans for Alaska. 3 figs

  4. 216-A-10 Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-10 Crib. The Crib is a landfill that received process condensate from the 202-A building Plutonium/Uranium Extraction Plant from 1956 to 1987. The crib has not received waste since March 1987 and will be closed under final facility standards. Waste management activities are no longer required at the crib, and it does not present significant hazard to adjacent units, personnel or the environment. It is unlikely that any incidents presenting hazards to the public health or the environment would occur at the 216-A-10 Crib

  5. Contingency planning and risk analysis for water and tailings management at Ranger Uranium Mines

    International Nuclear Information System (INIS)

    McNally, P.E.

    1986-01-01

    This paper describes some of the more likely risks and contingency procedures associated with the extremely variable monsoonal climate of the Alligator Rivers region in the Northern Territory in relation to the Ranger Uranium Mine. The tailings management system is basically a large storage impoundment and a reticulation system that delivers tailings sludge and recycles supernatant water. It is a closed circuit within the water management system and is dealt with as an integral part of that system

  6. Engineering Task Plan for Tank 241-C-106 contingency chiller definitive design

    International Nuclear Information System (INIS)

    Rensink, G.E.; Kriskovich, J.R.

    1995-01-01

    This document identifies the scope, cost, schedule and responsible organizations for completing a design of a contingency ventilation inlet air cooling system for Tank 241-C-106. The air cooling system, described in Rensink (1995), consists of a chiller, cooling coils, and supporting equipment that, when installed will be capable of assuring that the waste temperatures in Tank 241-C-106 are maintained within acceptable limits for safe storage. The effort described herein is scheduled for completion by May 31, 1995 to support Performance Based Incentive (PBI) Milestone SI-2x

  7. Striking Clepsydras

    Science.gov (United States)

    Nam, Moon-Hyon

    The term "Striking Clepsydra" is a shortened translation of the Korean name Jagyeongnu (自擊漏, tzu-chi lou in Chinese, literally "automatic-striking water-clock"). It was given to the two monumental time-keeping installations built by chief court engineer Yeong-sil Jang in AD 1432-38 under King Sejong (r. AD 1418-50) of the Joseon dynasty (1392-1910) in Seoul. These were housed separately in the Gyeongbok palace complex as major installations of the Royal Observatory Ganuidae equipped during 1432-38. One was the Striking Palace Clepsydra Borugangnu that was employed as the standard time-keeper from 1434, and the other was the Striking Heavenly Clepsydra Heumgyeonggangnu that was put into use not only as the symbol of Neo-Confucian ideology from 1438, but also as a demonstrational orrery and time-keeper. These were restored several times through the dynasty after loss by fires and warfare, and clepsydra-making technologies were succeeded by the development of armillary clocks in 1669. The National Palace Museum of Korea recreated the 1434 Striking Palace Clepsydra of King Sejong, and the replica was installed for permanent exhibition from November 2007.

  8. Contingency plan for the Old Hydrofracture Facility tanks sluicing project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-10-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), plans to begin a sluicing (flushing) and pumping project to remove the contents from five inactive, underground storage tanks at the Old Hydrofracture Facility (OHF) at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The tank contents will be transferred to the Melton Valley Storage Tanks, which are part of the active waste treatment system at ORNL. The purpose of the project is to minimize the risk of leaking the highly radioactive material to the environment. The five OHF tanks each contain a layer of sludge and a layer of supernatant. Based on a sampling project undertaken in 1995, the sludge in the tanks has been characterized as transuranic and mixed waste and the supernatants have been characterized as mixed waste. The combined radioactivity of the contents of the five tanks is approximately 29,500 Ci. This contingency plan is based on the preliminary design for the project and describes a series of potential accident/release scenarios for the project. It outlines Energy Systems' preliminary plans for prevention, detection, and mitigation. Prevention/detection methods range from using doubly contained pipelines to alarmed sensors and automatic pump cutoff systems. Plans for mitigation range from pumping leaked fluids from the built-in tank drainage systems and cleaning up spilled liquids to personnel evacuation

  9. Visits to Australia by nuclear powered or armed vessels: contingency planning for the accidental release of ionizing radiation

    International Nuclear Information System (INIS)

    1989-01-01

    The report refers to the adequacy of current contingency planning by the Australian Federal and Senate authorities to deal with the accidental release of ionizating radiation from visiting nuclear powered or armed vessels in Australian waters and ports. Much of the material was obtained in response to questions put in writing by the Senate Standing Committee to the Department of Defence, ANSTO and others. In addition, the report contains relevant information from Commonwealth documents as well as the Committee findings and recommendations. Issues considered include: types of visiting nuclear powered vessels, accident likelihood and consequences, differences between naval and land-based reactors, safety records. The persons or organizations who made submissions or appeared in all public hearings are listed in the appendixes, along with all visits to Australian ports by nuclear powered warships from 1976 to 1988

  10. 300 Area Process Trenches Supplemental Information to the Hanford Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    R.A. Carlson

    1997-01-01

    The 300 Area Process Trenches are surface impoundments which were used to receive routine discharges of nonregulated process cooling water from operations in the 300 Area and dangerous waste from several research and development laboratories and the 300 Area Fuels Fabrication process. Discharges to the trenches ceased in 1994, and they were physically isolated in 1995. Remediation of the trenches is scheduled to begin during July 1997. Currently, there are no waste management activities required at the 300 Area Process Trenches and the unit does not present any significant hazards to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 300 Area Process Trenches, however, during remediation, exposure, spill, fire, and industrial hazards will exist. This contingency plan addresses the emergency organization, equipment and evacuation routes pertinent to the process trenches during remediation

  11. Resource Conservation and Recovery Act (RCRA) general contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    Skaggs, B.E.

    1993-11-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures herein can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  12. Resource Conservation and Recovery Act (RCRA) contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-08-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  13. 78 FR 37741 - Approval and Promulgation of Implementation Plans; California; South Coast; Contingency Measures...

    Science.gov (United States)

    2013-06-24

    ... deliver: Marty Robin, Office of Air Planning (AIR- 2), U.S. Environmental Protection Agency Region 9, 75... INFORMATION CONTACT: Doris Lo, Air Planning Office (AIR-2), U.S. Environmental Protection Agency, Region 9... statute precludes a State from implementing such measures before they are triggered. See, e.g., LEAN v...

  14. Contingency Contracting within the Department of Defense: A Comparative Analysis

    National Research Council Canada - National Science Library

    McMillion, Chester

    2000-01-01

    .... The thesis compares and contrasts the regulations governing the contingency contracting operations, the organization structure, contingency contracting support plans, and the training requirements...

  15. 76 FR 51266 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-18

    ... which was selected in the ROD. The SDs hired M&S Ingenieria y Ciencia Asociados who prepared remedial... approved the Remedial Action Work Plan and M&S Ingenieria y Ciencia Asociados as the Settling Defendants...

  16. Hydrologic modeling as a tool for land management and contingency planning in the Calcasieu Sabine Basin. Volume 1

    International Nuclear Information System (INIS)

    Myers, J.; Meselhe, E.; Kheiashy, K.; Miller, R.; Douglas, C.

    2007-01-01

    The Calcasieu-Sabine Basin in southwest Louisiana contains approximately 126,518 hectares of wetlands, consisting of fresh marsh, intermediate marsh, brackish marsh and saline marsh. The hydrodynamics of the basin involves a combination of estuarine processes such as saltwater intrusion, response to water level fluctuations at an open boundary and lake dynamics. The basin is also affected by deep ship channels. As such, a robust, flexible and efficient numerical model is needed to incorporate all of these processes in an operational program. This study developed a hydrodynamic and salinity model for a portion of the basin that includes the lakes and marshes for the purpose of land management and contingency planning. The newly developed finite-difference hydrodynamic and salinity model is a combination of 1 and 2 dimensional computations and is intended for land, wildlife and habitat management. It can be used as a coastal restoration tool to evaluate the effectiveness of future and ongoing coastal restoration projects. The model was calibrated and validated against field measurements. It was shown to produce accurate simulations of the complex flow patterns of the Calcasieu-Sabine Basin along with information on salinity, water level fluctuations, velocities and discharges throughout the main channels and open water bodies within the area. It was concluded that the model provides a very useful planning and adaptive management tool to improve the understanding of the complex hydrology and salinity circulation pattern within the system. 5 refs., 4 tabs., 9 figs

  17. Contingency plan for the Old Hydrofracture Facility Tanks Sluicing Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-06-01

    This revised contingency plan addresses potential scenarios involving the release of radioactively contaminated waste from the Old Hydrofracture Facility Tanks Contents Removal project to the environment. The tanks are located at the Oak Ridge National Laboratory. The project involves sluicing the contents of the five underground tanks to mix the sludge and supernatant layers, and pumping the mixture to the Melton Valley Storage Tanks (MVST) for future processing. The sluicing system to be used for the project consists of a spray nozzle designated the open-quotes Borehole Miner,close quotes with an associated pump; in-tank submersible pumps to transfer tank contents from the sluice tanks to the recycle tank; high-pressure pumps providing slurry circulation and slurry transport to the MVST; piping; a ventilation system; a process water system; an instrumentation and control system centered around a programmable logic controller; a video monitoring system; and auxiliary equipment. The earlier version of this plan, which was developed during the preliminary design phase of the project, identified eight scenarios in which waste from the tanks might be released to the environment as a result of unanticipated equipment failure or an accident (e.g., vehicular accident). One of those scenarios, nuclear criticality, is no longer addressed by this plan because the tank waste will be isotopically diluted before sluicing begins. The other seven scenarios have been combined into three, and a fourth, Borehole Miner Failure, has been added as follows: (1) underground release from the tanks; (2) aboveground release or spill from the sluicing system, a tank riser, or the transfer pipeline; (3) release of unfiltered air through the ventilation system; and (4) Borehole Miner arm retraction failure. Methods for preventing, detecting, and responding to each release scenario are set out in the plan

  18. Temporal contingency

    Science.gov (United States)

    Gallistel, C.R.; Craig, Andrew R.; Shahan, Timothy A.

    2015-01-01

    Contingency, and more particularly temporal contingency, has often figured in thinking about the nature of learning. However, it has never been formally defined in such a way as to make it a measure that can be applied to most animal learning protocols. We use elementary information theory to define contingency in such a way as to make it a measurable property of almost any conditioning protocol. We discuss how making it a measurable construct enables the exploration of the role of different contingencies in the acquisition and performance of classically and operantly conditioned behavior. PMID:23994260

  19. Temporal contingency.

    Science.gov (United States)

    Gallistel, C R; Craig, Andrew R; Shahan, Timothy A

    2014-01-01

    Contingency, and more particularly temporal contingency, has often figured in thinking about the nature of learning. However, it has never been formally defined in such a way as to make it a measure that can be applied to most animal learning protocols. We use elementary information theory to define contingency in such a way as to make it a measurable property of almost any conditioning protocol. We discuss how making it a measurable construct enables the exploration of the role of different contingencies in the acquisition and performance of classically and operantly conditioned behavior. Copyright © 2013 Elsevier B.V. All rights reserved.

  20. Planning and management for health in periods of economic stringency and instability: a contingency approach.

    Science.gov (United States)

    van der Werff, A

    1986-01-01

    The mid-1970s marked the end of the longest period of uninterrupted economic growth in history, and initiated in Europe--and other parts of the world--a period of economic stagnation and instability. Along with the prosperity explosion of the past, the pattern of health problems has changed and is still changing. Moreover, the demand for health care has kept on rising, without much improvement of health status in general. Thus, there is a critical need to rethink policies, and to ensure that future changes occur within the limits of shrinking resources and the allotted time-span. In particular, the change in priorities envisaged by the Health for All 2000 (HFA 2000) strategies will need to take place against the background of an ageing population, social instability, and continuing development of new lifestyles and persistent economic scarcity. It is by analysing that background that this article seeks to make recommendations as to how health planning and management might successfully cope with the policy reorientation of the HFA 2000 strategy. The structure of this article is as follows. Firstly, the changes taking place in planning conditions will be reviewed, and form the basis of a framework for subsequent analysis of the planning environment. Following this framework, some of the conflicts likely to be faced in planning and management will be discussed, many of which are the consequence of economic stringency and instability. Also the requirements for an improvement of the effectiveness and efficiency of planning will be identified. Finally, a limited number of approaches to planning will be considered, for their appropriateness to the present-day economic circumstances. The point of view elucidated throughout is that there is no single solution which is 'best' under all circumstances. The conclusion, rather, is that the selection of particular theory or method of planning and management should depend both on the objectives of the decision maker and on the

  1. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2013-10-01

    Annex W plan may utilize strength, weakness, opportunity, threat ( SWOT ) and capability gap analysis techniques. The SWOT method allows the IPE to...accountability and performance, the authors contend that international military organizations will benefit by incorporating Phase Zero Contracting Operations...analytical areas, such as OPLAN analysis , logistics assessments, contracting, and similar professional disciplines. Of note, most organizations do

  2. 75 FR 27464 - Special Reporting, Analysis and Contingent Resolution Plans at Certain Large Insured Depository...

    Science.gov (United States)

    2010-05-17

    ... FDIC is responsible for administering or enforcing. The FDIC also has authority to adopt regulations... strategies, strategies to mitigate systemic risks and overall planning for an orderly resolution in the..., describing means of preserving franchise value, maximizing recovery to creditors, and minimizing systemic...

  3. LMHC/TWRS year 2000 equipment project renovation and contingency plan

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A program has been completed to assess, renovate and document tank farm field equipment year 2000 compliance. A communication plan has also been prepared (see section 8.0). The objective of the program was to assure that no adverse effects occur in tank farm operations as a result of equipment malfunction due to the advent of year 2000. The purposes of this document are to: describe the process used to assess field equipment; document items found to be compliant; document items found to be non-compliant including options for making the equipment year 2000 functional and/or tolerant; describe location and management of field equipment year 2000 documentation; assess overall vulnerability of TWRS field equipment with regard to year 2000 problems and describe plans to communicate year 2000 equipment review results and corrective actions

  4. 241-CX-70, 241-CX-71, and 241-CX-72 underground storage tanks at the strontium semiworks facility supplemental information to the Hanford Facility Contingency Plan

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-03-01

    This document is a unit-specific contingency plan for the underground storage tanks at the Strontium Semiworks Facility and is intended to be used as a supplement to the Hanford Facility Contingency Plan. This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of WAC 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units. Radioactive material is contained in three underground storage tanks: 241-CX-70, 241-CX-71, and 241-CX-72. Tank 241-CX-70 has been emptied, except for residual quantities of waste, and has been classified as an elementary neutralization tank under the RCRA. Tanks 241-CX-71 and 241-CX-72 contain radioactive and Washington State-only dangerous waste material, but do not present a significant hazard to adjacent facilities, personnel, or the environment. Currently, dangerous waste management activities are not being applied at the tanks. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the Strontium Semiworks Facility

  5. Risk management and contingency planning for year 2000 - key business decisions for the success of an organization

    International Nuclear Information System (INIS)

    McNeil, J.L.

    1998-01-01

    Factors that transformed Y2K, initially considered as primarily a computer problem, into a business problem are outlined. For example, many organizations have prioritized their inventory of information technology (IT) systems, but few have prioritized their suppliers or customers, or have even thought of what will happen if they cannot get products, or cannot get paid by their customers. Estimates at this time reveal that approximately 30 per cent of businesses will not be operational. This presents a significant risk to any organisation's bottom line. Add to this the status of the world as a whole, where other than about 12 major countries, the majority has not even began to remediate their Y2K problems, and we begin to get a true picture of the potential of major communications problems with subsidiaries, partners or suppliers. Consideration of these factors make it easy to see how Y2K is potentially a major business problem. Because of these risks, it is strongly urged that organizations perform risk management and contingency planning. An example of a risk management approach is presented

  6. Resource Estimations in Contingency Planning for Foot-And-Mouth Disease

    DEFF Research Database (Denmark)

    Boklund, Anette; Sten, Mortensen; Holm Johansen, Maren

    Preparedness planning for a veterinary crisis is important to be fast and effective in the eradication of disease. For countries with a large export of animals and animal products, each extra day in an epidemic will cost millions of euros due to the closure of export markets. This is important....... It was estimated that the need for personnel would peak on day 7 with a requirement of approximately 170 veterinarians, 70 technicians and 45 administrative staff. However, the need for personnel in the Danish Emergency Management Agency (responsible for the hygiene barrier and initial cleaning and disinfection...

  7. Contingency planning and emergency response in construction activities: Training the construction worker

    International Nuclear Information System (INIS)

    Jones, E.

    1987-01-01

    Construction activities have the potential for environmental and/or health impacts at Oak Ridge National Laboratory (ORNL) particularly as site cleanup and restoration plans are initiated. ORNL has instituted special training for all construction workers and related contractors. Individuals learn how construction activities at ORNL can potentially have adverse effects on the environment and their health, and to learn how to respond to potential chemical and radiation hazards. Workers are given a review of basic information on radiation and chemicals in a framework that emphasizes the situations in which workers or the environment may be exposed to potential risk. Specific instructions are presented on what to do when contamination is suspected, with identification of emergency procedures and response personnel. 5 refs., 1 fig

  8. Planning urban megaprojects in the Gulf: The international consultancy firms in urban planning between global and contingent

    Directory of Open Access Journals (Sweden)

    Oula Aoun

    2016-06-01

    Full Text Available Driven by globalization and market openings, many architecture and engineering firms have become global. By focusing on the urban megaprojects in the Gulf, a particular cultural and political context, this paper argues that such firms have a major role in the rapid urban transformation of Gulf countries and act as transfer agents of an international knowledge in the urban planning domain. However, the transfer is adapted by several context-related characteristics, such as local governance, urban knowledge, and regulatory framework. This paper explores the procedural adaptation of these firms to the Gulf Cooperation Council (GCC in terms of internal structure, methodology, adopted tools, and interaction with the context. The level of learning that results from this transfer is also investigated.

  9. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  10. Future Contingents

    DEFF Research Database (Denmark)

    Øhrstrøm, Peter; Hasle., Per F. V.

    2015-01-01

    contingent statements. The problem of future contingents is interwoven with a number of issues in theology, philosophy, logic, semantics of natural language, computer science, and applied mathematics. The theological issue of how to reconcile the assumption of God's foreknowledge with the freedom and moral...... accountability of human beings has been a main impetus to the discussion and a major inspiration to the development of various logical models of time and future contingents. This theological issue is connected with the general philosophical question of determinism versus indeterminism. Within logic, the relation...... about the future. Finally, it should be mentioned that temporal logic has found a remarkable application in computer science and applied mathematics. In the late 1970s the first computer scientists realised the relevance of temporal logic for the purposes of computer science (see Hasle and Øhrstrøm 2004)....

  11. Future Contingents

    DEFF Research Database (Denmark)

    Øhrstrøm, Peter; Hasle., Per F. V.

    2011-01-01

    contingent statements. The problem of future contingents is interwoven with a number of issues in theology, philosophy, logic, semantics of natural language, computer science, and applied mathematics. The theological issue of how to reconcile the assumption of God's foreknowledge with the freedom and moral...... accountability of human beings has been a main impetus to the discussion and a major inspiration to the development of various logical models of time and future contingents. This theological issue is connected with the general philosophical question of determinism versus indeterminism. Within logic, the relation...... about the future. Finally, it should be mentioned that temporal logic has found a remarkable application in computer science and applied mathematics. In the late 1970s the first computer scientists realised the relevance of temporal logic for the purposes of computer science (see Hasle and Øhrstrøm 2004)....

  12. Detailed oil spill contingency analysis in establishment of preparedness plans for exploration drilling in environmentally sensitive areas: an integrated management process

    Energy Technology Data Exchange (ETDEWEB)

    Spikkerud, Cathrine S.; Skeie, Geir Morten; Brude, Odd Willy; Gravir, Gjermund [DNV Managing Risk, Oslo (Norway)

    2008-07-01

    This paper describes the integrated management process leading up to a dynamic oil spill preparedness plan based on detailed analysis of oil spill contingency requirements and environmental risk in environmentally sensitive areas. Starting with a detailed environmental risk and oil spill contingency analysis, oil spill preparedness plans are developed. These plans are generic for the area possibly affected by an oil spill, and are developed in detail for environmental 'hot spots' that are highly challenging in terms of oil spill response. The detailed plans make use of detailed data sets on shoreline substrate sensitivities and cleanup methodology, photographic inventory, logistical issues and access to real-time incident data for important areas. This detailed approach ensures sufficient knowledge about the sensitive area in advance to provide fast and correct strategic and tactical operational recovery decisions. A final element of the integrated process is a web based GIS, providing all parties involved with one common situation overview, ensuring that the facts remain in focus throughout the operation and that those responsible for informing stake-holders have access to correct and timely updated information. (author)

  13. Study of the Model of Activating Contingency Plans within Disruptive Incidents by Stages%突发事件下分阶段启动应急预案模型研究

    Institute of Scientific and Technical Information of China (English)

    于辉; 江智慧

    2011-01-01

    经前期处置下,研究管理者面对突发事件应该何时启动前期处置方案和应急预案的问题.在完全没有突发事件持续时阎信息的条件下,利用局内决策理论与方法构建了企业何时启动前期处置方案和应急预案的分阶段启动模型,并利用"竞争比"说明该方案的有效性.在此基础上,进一步通过数值分析表明分阶段启动应急预案的重要意义.%The increased number of natural disasters has disrupted social and economic progress. Minimizing the impact of these disasters can bring stability to society. Emergency response systems have played an important role in achieving this goal. Since the "SARS" crisis in the year 2003, China has begun to focus on building emergency response systems. A national contingency plan system was established in 2004 according to the "Classification" rule. China initially formed a main emergency plan system,constituted by national overall emergency response plans, specific contingency plans, department emergency plans, local emergency plans, and contingency plans for enterprises with large-scale activities.Existing literature has focused on the importance of contingency plans, the assessment of contingency plans, and approaches to improving emergency preparedness. Few studies have addressed problems associated with the activation of contingency plans when the public administration is disrupted by natural disasters. This paper investigates how managers activate contingency plans at the predisposal stage and potential problems that may arise from disruption by natural disasters at this stage. Case studies are conducted and our analysis results show that activating contingency plans at the pre-disposition stage is effective at dealing with public crises caused by natural disasters. A mathematical model is constructed to provide information on when to activate contingency plans in different phases.Decision theories and methods are used to help propose an

  14. F-35 Joint Strike Fighter: Continued Oversight Needed as Program Plans to Begin Development of New Capabilities

    Science.gov (United States)

    2016-04-01

    material , permission from the copyright holder may be necessary if you wish to reproduce this material separately. Page 1 GAO-16-390 F-35 Joint...conducted this performance audit from June 2015 to April 2016 in accordance with generally accepted government auditing standards. Those standards...require that we plan and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions

  15. Contingency proportion systematically influences contingency learning.

    Science.gov (United States)

    Forrin, Noah D; MacLeod, Colin M

    2018-01-01

    In the color-word contingency learning paradigm, each word appears more often in one color (high contingency) than in the other colors (low contingency). Shortly after beginning the task, color identification responses become faster on the high-contingency trials than on the low-contingency trials-the contingency learning effect. Across five groups, we varied the high-contingency proportion in 10% steps, from 80% to 40%. The size of the contingency learning effect was positively related to high-contingency proportion, with the effect disappearing when high contingency was reduced to 40%. At the two highest contingency proportions, the magnitude of the effect increased over trials, the pattern suggesting that there was an increasing cost for the low-contingency trials rather than an increasing benefit for the high-contingency trials. Overall, the results fit a modified version of Schmidt's (2013, Acta Psychologica, 142, 119-126) parallel episodic processing account in which prior trial instances are routinely retrieved from memory and influence current trial performance.

  16. Analyzing Contingency Contracting Purchases for Operation Iraqi Freedom (Unrestricted Version)

    National Research Council Canada - National Science Library

    Baldwin, Laura H; Ausink, John A; Campbell, Nancy F; Drew, John G; Roll, Jr, Charles R

    2008-01-01

    ...) in an effort to determine the size and extent of contractor support, and how plans for and the organization and execution of contingency contracting activities might be improved so that Contingency...

  17. Model for negotiation on contingency plans for distribution of natural gas; Modelo de negociacao para planos de contingencia energetica na area de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Sobral, Marcos Felipe Falcao; Morais, Danielle Costa [Universidade Federal de Pernambuco (UFPE), Recife, PE (Brazil)

    2008-07-01

    The high consumption of Natural Gas (NG), the environmental and economic turbulences that occurred in recent years raises questions about the supply of the product in critical situations. Characteristic factors of natural gas, like the high cost of storage, show the need for the establishment of contingency plans that define what procedures should be adopted in the distribution of Natural Gas or redistribute among consumers in times of restriction of supply, substantial increase on demand or reduction in the ability of supply. These plans aim to define in advance the actions that will be adopted, providing business and consumer segments clear rules indicate the time to search for alternative sources in case of crisis. The current models can not yet address the problem of negotiation for the division of the product following the concepts proposed by the science of trading, making things like proportionality and envy-free are not observed. The aim of this study is to propose a model for distribution of quotas for supply of NG between different consumer segments. The proposed algorithm combines the procedures of Knaster, Steinhaus and Divide the Dollar, seeking an allocation that minimize the feeling of jealousy and provide an equitable distribution. (author)

  18. Contingency Teaching during Close Reading

    Science.gov (United States)

    Fisher, Douglas; Frey, Nancy

    2015-01-01

    12 teachers were interviewed and observed as they engaged students in close reading. We analyzed their responses and instruction to determine the scaffolds that were used as well as the contingency teaching plans they implemented when students were unable to understand the text.

  19. Dynamic Contingency Analysis Tool

    Energy Technology Data Exchange (ETDEWEB)

    2016-01-14

    The Dynamic Contingency Analysis Tool (DCAT) is an open-platform and publicly available methodology to help develop applications that aim to improve the capabilities of power system planning engineers to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. Outputs from the DCAT will help find mitigation solutions to reduce the risk of cascading outages in technically sound and effective ways. The current prototype DCAT implementation has been developed as a Python code that accesses the simulation functions of the Siemens PSS/E planning tool (PSS/E). It has the following features: It uses a hybrid dynamic and steady-state approach to simulating the cascading outage sequences that includes fast dynamic and slower steady-state events. It integrates dynamic models with protection scheme models for generation, transmission, and load. It models special protection systems (SPSs)/remedial action schemes (RASs) and automatic and manual corrective actions. Overall, the DCAT attempts to bridge multiple gaps in cascading-outage analysis in a single, unique prototype tool capable of automatically simulating and analyzing cascading sequences in real systems using multiprocessor computers.While the DCAT has been implemented using PSS/E in Phase I of the study, other commercial software packages with similar capabilities can be used within the DCAT framework.

  20. PETROBRAS Transportes (TRANSPETRO) contingency plan system; Metodologia SIE (Sistema Informatizado de Emergencia) aplicada no gerenciamento das contingencias

    Energy Technology Data Exchange (ETDEWEB)

    Berardinelli, Ricardo; Mendonca, Daniela [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil). Coordenacao de Seguranca, Saude e Meio Ambiente de Dutos e Terminais; Morais, Lucia B.; Carvalho, Marcelo Tilio M. de [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Dept. de Informatica. Grupo de Tecnologia em Computacao Grafica (TECGRAF)

    2005-07-01

    This paper describes the PETROBRAS Transportes Emergency Response System, which was designed to improve the response to emergency situations. The plans are defined based on an evaluation of the organization of the emergency teams, the communication procedures, characterization of the installations, definition of accidental scenarios, environmental sensitivity maps; simulation of oil spill trajectories and dispersion behavior; geographical data of the area surrounding the installations; other conventional data related to the installations, including equipment available and the InfoPAE system. Plans include several scenarios as oil spills, gas, fire, explosion, hazardous materials which can be applied to terminals and pipelines. (author)

  1. Lightning Often Strikes Twice

    Science.gov (United States)

    2005-01-01

    Contrary to popular misconception, lightning often strikes the same place twice. Certain conditions are just ripe for a bolt of electricity to come zapping down; and a lightning strike is powerful enough to do a lot of damage wherever it hits. NASA created the Accurate Location of Lightning Strikes technology to determine the ground strike point of lightning and prevent electrical damage in the immediate vicinity of the Space Shuttle launch pads at Kennedy Space Center. The area surrounding the launch pads is enmeshed in a network of electrical wires and components, and electronic equipment is highly susceptible to lightning strike damage. The accurate knowledge of the striking point is important so that crews can determine which equipment or system needs to be retested following a strike. Accurate to within a few yards, this technology can locate a lightning strike in the perimeter of the launch pad. As an added bonus, the engineers, then knowing where the lightning struck, can adjust the variables that may be attracting the lightning, to create a zone that will be less susceptible to future strikes.

  2. 77 FR 12644 - Submission of U.S. Carrier and Airport Tarmac Delay Contingency Plans to Department of...

    Science.gov (United States)

    2012-03-01

    ... (Enforcement Office) will be establishing an electronic submission system to enable covered airlines and... also contain a description of how the carrier will: (1) Provide adequate food, potable water, restroom... complaint reporting system, where covered airlines and airports will submit their required plans. The...

  3. 77 FR 27267 - Submission of U.S. Carrier and Airport Tarmac Delay Contingency Plans to Department of...

    Science.gov (United States)

    2012-05-09

    ... also contain a description of how the carrier will: (1) Provide adequate food, potable water, restroom... , similar to the Department's current disability complaint reporting system, to enable covered U.S. airlines... to use the tarmac delay plan filing system, covered U.S. airlines and airports will need to register...

  4. Options with Extreme Strikes

    Directory of Open Access Journals (Sweden)

    Lingjiong Zhu

    2015-07-01

    Full Text Available In this short paper, we study the asymptotics for the price of call options for very large strikes and put options for very small strikes. The stock price is assumed to follow the Black–Scholes models. We analyze European, Asian, American, Parisian and perpetual options and conclude that the tail asymptotics for these option types fall into four scenarios.

  5. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  6. Real-time laboratory exercises to test contingency plans for classical swine fever: experiences from two national laboratories

    DEFF Research Database (Denmark)

    Koenen, K.; Uttenthal, Åse; Meindl-Böhmer, A.

    2007-01-01

    In order to adequately and efficiently handle outbreaks of contagious diseases such as classical swine fever (CSF), foot and mouth disease or highly pathogenic avian influenza, competent authorities and the laboratories involved have to be well prepared and must be in possession of functioning....... It is essential that these plans are established during ‘peace-time’ and are reviewed regularly. This paper provides suggestions on how to perform laboratory exercises to test preparedness and describes the experiences of two national reference laboratories for CSF. The major lesson learnt was the importance...

  7. Evaluation and analysis of emergency maintenance due by third party action's, formulation and execution of contingency plans

    Energy Technology Data Exchange (ETDEWEB)

    Torres Vega, Raul; Nunez Ribera, Gary [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2009-07-01

    In September 2008, in the Yacuiba - Rio Grande Gas Pipeline (GASYRG) located in the south of Bolivia, atypical situations took place. Due to the political events and the social mobilizations in which the country was, a series of third party actions developed putting in risk the facilities of the gas pipeline. These actions resulted in the rupture of a 1 inch instrumentation pipe, causing a leak witch some time caught fire and caused an interruption of the transportation service in that section of the pipeline, later on, another action derived in safety valve shut down causing a total pipeline shut down. In addition to these events we experience a fuel shortage, road blocks and a telephone communication system failure. In spite of these obstacles the maintenance activities were realized and emergency repairs put back in operating conditions the gas pipeline, task that was accomplished in a very short time, taking in account the situation. Later analysis, including all the adverse elements of the situation, result in the adoption of a series of measures and plans directed to mitigate the risk associated to this type of events, such as Mutual Aid Plans with fellow companies and institutions, fortification of the patrimonial security, stock material handling for emergency repairs, etc. (author)

  8. Geographic Response Information Network : a new tool to manage community information for oil spill contingency planning and response operations

    Energy Technology Data Exchange (ETDEWEB)

    Munger, M.; Bryant, T. [Cook Inlet Regional Citizen' s Advisory Council, Kenai, AK (United States); Haugstad, E.; Kwietniak, J. [Tesora Alaska Petroleum, Kenai, AK (United States); DeCola, E.; Robertson, T. [Nuka Research and Planning Group, Seldovia, AK (United States)

    2006-07-01

    This paper described the Geographic Response Information Network (GRIN) project which was launched to address some of the logistical challenges that often complicate oil spill and emergency response operations. The objective of the project was to develop a computer-based tool for incident logistics to organize maps and data related to oil spills, safety, public relations and basic community resources. In addition to its use for oil spill response planning, the data available can be useful for all-hazards emergency response planning. Early prototypes of the GRIN used PowerPoint slides to organize basic information about coastal communities in Alaska. With time, hyper text markup language (html) was used as the programming format because it can be more readily hyper-linked. Currently, GRIN is organized as a web page with the following 5 categories of information: general, liaison, public information, logistics and safety. There are several sub-headings under each category, such as location, people, economy, subsistence and transportation. This general information allows incident management personnel to obtain a community profile to better understand the cultural, social and economic basis of the community. The GRIN prototype was developed for the Kodiak urban area, but it may be expanded in the future to include other coastal communities in Alaska. 3 refs., 6 figs.

  9. Geographic Response Information Network : a new tool to manage community information for oil spill contingency planning and response operations

    International Nuclear Information System (INIS)

    Munger, M.; Bryant, T.; Haugstad, E.; Kwietniak, J.; DeCola, E.; Robertson, T.

    2006-01-01

    This paper described the Geographic Response Information Network (GRIN) project which was launched to address some of the logistical challenges that often complicate oil spill and emergency response operations. The objective of the project was to develop a computer-based tool for incident logistics to organize maps and data related to oil spills, safety, public relations and basic community resources. In addition to its use for oil spill response planning, the data available can be useful for all-hazards emergency response planning. Early prototypes of the GRIN used PowerPoint slides to organize basic information about coastal communities in Alaska. With time, hyper text markup language (html) was used as the programming format because it can be more readily hyper-linked. Currently, GRIN is organized as a web page with the following 5 categories of information: general, liaison, public information, logistics and safety. There are several sub-headings under each category, such as location, people, economy, subsistence and transportation. This general information allows incident management personnel to obtain a community profile to better understand the cultural, social and economic basis of the community. The GRIN prototype was developed for the Kodiak urban area, but it may be expanded in the future to include other coastal communities in Alaska. 3 refs., 6 figs

  10. 25 CFR 39.501 - What is an emergency or unforeseen contingency?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is an emergency or unforeseen contingency? 39.501... EQUALIZATION PROGRAM Contingency Fund § 39.501 What is an emergency or unforeseen contingency? An emergency or unforeseen contingency is an event that meets all of the following criteria: (a) It could not be planned for...

  11. Exercise ASKARI SERPENT: enabling clinical data collection during exercises and operations to support future contingency planning and assurance of category-based reporting systems.

    Science.gov (United States)

    Parsons, Iain T; Wheatley, R J; Carter, P

    2016-02-01

    Exercise ASKARI SERPENT (Ex AS) is a British Army exercise that provides primary healthcare (PHC) to Kenyan civilians in support of local health authorities. It is conducted in partnership with the Kenya Defence Force Medical Services (KDFMS). Accurate epidemiological data is critical in planning the exercise and for any future short-notice contingency operations in similar environments. This paper reports epidemiological data for Ex AS using a novel data collection system. PHC on Ex AS was delivered by trained and validated combat medical technicians (CMTs) using a set of Read-coded protocols. The CMTs were also directly supported and supervised by medical officers and nurses. A total of 3093 consultations were conducted over a 16-day period. Of these, 2707 (87.5%) consultations fell within the remit of the CMT protocols, with only 386 consultations (12.5%) being conducted exclusively by the medical officers or nurses. A Read-coded matrix built on CMT protocols is a simple and useful tool, particularly in civilian populations, for collecting morbidity data with the vast majority of conditions accounted for in the protocols. It is anticipated that such a system can better inform training, manning, medical material and pharmaceutical procurement than current category-based morbidity surveillance systems such as EPINATO (NATO epidemiological data). There is clear advantage to directly linking data capture to treatment algorithms. Accuracy, both in terms of numbers and condition, is likely improved. Data is also captured contemporaneously rather than after indeterminate time. Read coding has the added benefit of being an established electronic standard. In addition, the system would support traditional reporting methods such as EPINATO by providing increased assurance. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  12. The economic value of transportation energy contingency planning: An objective model for analyzing the economics of domestic renewable energy for supply augmentation

    Science.gov (United States)

    Shaten, Richard Jay

    1998-12-01

    Petroleum provides 90% of transportation energy needs. Domestic production is decreasing and global demand is increasing. Risk of escalating prices and supply interruptions are compounded by environmental and military externalities and lost opportunities from the failure to develop alternative domestic resources. Within the context of "energy contingency planning" municipalities should evaluate crisis mitigation strategies. Supply augmentation using domestic renewable fuels is proposed to avert future financial liabilities. A method for calculating the economic value of this strategy is demonstrated. An objective function and associated constraints represent the cost of preparing for each of three possible scenarios: status quo, inflationary and crisis. Constraints ensure that municipal fuel needs are met. Environmental costs may be included. Optimal solutions determine the fuel supply mix for each scenario. A 3 x 3 matrix presents the range of actual costs resulting from preparing for each scenario and subsequent three possible outcomes. The distribution of probabilities of the outcomes is applied to the cost matrix and an "expected value" of preparing for each scenario is calculated. An unanticipated crisis outcome results in. The expected value of the cost of preparing for a crisis is cast as an insurance premium against potential economic liability. Policy makers accept the crisis preparation fuel mix if: (a) they agree with the calculated penalty cost, or (b) they accept the burden of the insurance premium. Green Bay Wisconsin was chosen as a sample municipality. Results show that a perceived 10% chance of crisis requires an annual tax of 4.00 per household to avert economic impacts of 50 million. At a perceived 50% chance of crisis preparing for the crisis would begin to save the municipality money.

  13. Defense Infrastructure: Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations

    Science.gov (United States)

    2016-09-01

    supporting documentation for reviews that the U.S. Forces-Afghanistan conducted beginning in November 2011 of planned or ongoing contingency ...12 Contingency basing includes the planning , designing, constructing, operating, managing, and transitioning or closing of a non-enduring location...2016). Background Definition of “ Contingency Construction” Project Page 7 GAO-16-406 Defense Infrastructure statutory authority

  14. Algab õppus "Saber Strike"

    Index Scriptorium Estoniae

    2014-01-01

    Täna algab Eestis, Lätis ja Leedus Ameerika Ühendriikide Euroopa väekoondise õppus "Saber Strike", mille eesmärk on maaväeüksuste koostöö harjutamine. Õppusest võtab osa üle 2000 kaitseväelase Baltimaadest, USAst, Ühendkuningriigist, Taanist, Norrast, Soomest ja Saksamaalt. Eestist osaleb õppusel ligi 400 kaitseväelast

  15. Collective proposal of Contingency Plan as an alternative for management risks to socioenvironmental disasters within Network Management Risk of Córrego Dantas (REGER-CD), Nova Friburgo, State of Rio de Janeiro, Brazil

    Science.gov (United States)

    Freitas, Leonardo; Luiza Coelho Netto, Ana

    2017-04-01

    An extreme rainfall event took place in the Mountainous Region of the state of Rio de Janeiro in January 2011, causing a catastrophic landslide that resulted in more than 900 deaths and 350 people disappearances. Precipitation events associated with landslides are common in this region and climate change tends to increase the frequency of intense rains and, consequently, landslides. At the same time, the vulnerability of communities has increased as a result of disorderly urban growth. Despite that, before 2011 communities and public power were not prepared to disaster management..After the 2011 event, public authorities try to established policies to reduce these vulnerabilities. One of the communities where the government acted was Córrego Dantas. However, the actions in this place were carried out in a top-down model, without discussion with population. As a consequence, the performance of public power has amplified social vulnerabilities. Highlight for the truculent removal of residents; resettlement in geographically isolated housing complexes; and the establishment of urbanization policies that go against the interests of the residents. The construction of the Córrego d'Aantas Disaster Risk Management Network (REGER-CD), including residents of affected communities, researchers, NGO members and representatives of the public power, is one way to respond these questions. Within this network, the construction of a proposal for a collective contingency plan, articulated with the municipal contingency plan, is generating residents' empowerment, greater adaptation to risks and reducing the vulnerability of Disasters and mass movements

  16. The Poster Strikes Back

    DEFF Research Database (Denmark)

    Christensen, Line Hjorth

    2005-01-01

    The paper discusses fundamental issues in relation to placing graphic design in locations such as museums of decorative arts and living history museums. Based on my Ph.D. project on British commercial posters of the interwar years and approached from a combined perspective of museology, semiotics...... and design history, I argue that the poster during the interwar years inhabits a new active position. By exploiting and challenging the commercial and aesthetic paradox out of which it arose, the poster ‘strikes back' as a museologized, exhibited object. Rather than being absorbed into the city swirl...

  17. Global strike hypersonic weapons

    Science.gov (United States)

    Lewis, Mark J.

    2017-11-01

    Beginning in the 1940's, the United States has pursued the development of hypersonic technologies, enabling atmospheric flight in excess of five times the speed of sound. Hypersonic flight has application to a range of military and civilian applications, including commercial transport, space access, and various weapons and sensing platforms. A number of flight tests of hypersonic vehicles have been conducted by countries around the world, including the United States, Russia, and China, that could lead the way to future hypersonic global strike weapon systems. These weapons would be especially effective at penetrating conventional defenses, and could pose a significant risk to national security.

  18. Rapid Automated Mission Planning System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is an automated UAS mission planning system that will rapidly identify emergency (contingency) landing sites, manage contingency routing, and...

  19. Thomas Aquinas on Contingency of Nature

    Czech Academy of Sciences Publication Activity Database

    Dvořák, Petr

    2008-01-01

    Roč. 5, č. 2 (2008), s. 185-196 ISSN 1214-8407 R&D Projects: GA AV ČR(CZ) IAA900090602 Institutional research plan: CEZ:AV0Z90090514 Keywords : Thomas Aquinas * determinism * contingency Subject RIV: AA - Philosophy ; Religion

  20. Striking Pay Dirt!

    Science.gov (United States)

    Conger, George

    1984-01-01

    The conception and development of a plan to lease community college property for oil drilling is described, emphasizing the governing board's role in the process. The risks, uncertainties, relationships with local fuel companies, and positive public perception are discussed. (MSE)

  1. Contingencies of Value

    DEFF Research Database (Denmark)

    Strandvad, Sara Malou

    2014-01-01

    Based on a study of the admission test at a design school, this paper investigates the contingencies of aesthetic values as these become visible in assessment practices. Theoretically, the paper takes its starting point in Herrnstein Smith’s notion of ‘contingencies of values’ and outlines...... a pragmatist ground where cultural sociology and economic sociology meet. Informed by the literature on cultural intermediaries, the paper discusses the role of evaluators and the devices which accompany them. Whereas studies of cultural intermediaries traditionally apply a Bourdieusian perspective, recent......, the paper does not accept this storyline. As an alternative, the paper outlines the contingencies of values which are at play at the admission test, composed of official assessment criteria and scoring devices together with conventions within the world of design, and set in motion by interactions...

  2. Contingent valuation and incentives

    Science.gov (United States)

    Patricia A. Champ; Nicholas E. Flores; Thomas C. Brown; James Chivers

    2002-01-01

    We empirically investigate the effect of the payment mechanism on contingent values by asking a willingness-to-pay question with one of three different payment mechanisms: individual contribution, contribution with provision point, and referendum. We find statistical evidence of more affirmative responses in the referendum treatment relative to the individual...

  3. Supervisory Styles: A Contingency Framework

    Science.gov (United States)

    Boehe, Dirk Michael

    2016-01-01

    While the contingent nature of doctoral supervision has been acknowledged, the literature on supervisory styles has yet to deliver a theory-based contingency framework. A contingency framework can assist supervisors and research students in identifying appropriate supervisory styles under varying circumstances. The conceptual study reported here…

  4. Contingency diagrams as teaching tools

    OpenAIRE

    Mattaini, Mark A.

    1995-01-01

    Contingency diagrams are particularly effective teaching tools, because they provide a means for students to view the complexities of contingency networks present in natural and laboratory settings while displaying the elementary processes that constitute those networks. This paper sketches recent developments in this visualization technology and illustrates approaches for using contingency diagrams in teaching.

  5. The COG Strikes Back

    DEFF Research Database (Denmark)

    Barfoed, Jacob

    2014-01-01

    The Clausewitzian Center of Gravity (COG) concept is central in western military strategic thinking and serves as a core concept in military planning. However, several interpretations of the concept exist, which contributes to theoretical as well as practical confusion. Moreover, the concept...... contributes to the discussion by combining the COG concept with strategic theory, hereby addressing many of the raised critique points. The article presents three COG-Strategy schools, centered on different/competing interpretations of the Clausewitzian Center of Gravity (CoG) concept as well as different...

  6. Social Sensorimotor Contingencies

    OpenAIRE

    Bütepage, Judith

    2016-01-01

    As the field of robotics advances, more robots are employed in our everyday environment. Thus, the implementation of robots that can actively engage in physical collaboration and naturally interact with humans is of high importance. In order to achieve this goal, it is necessary to study human interaction and social cognition and how these aspects can be implemented in robotic agents. The theory of social sensorimotor contingencies hypothesises that many aspects of human-human interaction de...

  7. Hadron Dragons strike again

    CERN Multimedia

    2009-01-01

    The CERN Dragon Boat team – the Hadron Dragons – achieved a fantastic result at the "Paddle for Cancer" Dragon Boat Festival at Lac de Joux on 6 September. CERN Hadron Dragons heading for the start line.Under blue skies and on a clear lake, the Hadron Dragons won 2nd place in a hard-fought final, following top times in the previous heats. In a close and dramatic race – neck-and-neck until the final 50 metres – the local Lac-de-Joux team managed to inch ahead at the last moment. The Hadron Dragons were delighted to take part in this festival. No one would turn down a day out in such a friendly and fun atmosphere, but the Dragons were also giving their support to cancer awareness and fund-raising in association with ESCA (English-Speaking Cancer Association of Geneva). Riding on their great success in recent competitions, the Hadron Dragons plan to enter the last Dragon Boat festival of 2009 in Annecy on 17-18 October. This will coincide with t...

  8. Continental United States Hurricane Strikes

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Continental U.S. Hurricane Strikes Poster is our most popular poster which is updated annually. The poster includes all hurricanes that affected the U.S. since...

  9. Consolidation of Contingency Data and Its Use in Computer Graphics to Plan Bare Base Facility Construction at a Forward Operating Location.

    Science.gov (United States)

    1983-09-01

    a number of Harvest Eagle kits positioned in Europe and the Pacific theaters (12). Harvest Bare, a prepackaged kit of prefabricated expandable...Environmental Studies. San Diego University. Ecological Assessment of Vandenberg Air Force Base, California. Volume III. Environ- mental Planning System

  10. Contingency Management of Health Care Organizations: It Depends.

    Science.gov (United States)

    Olden, Peter C

    Managers in health care organizations (HCOs) must perform many processes and activities, such as planning goals, designing organization structure, leading people, motivating employees, making decisions, and resolving conflict. How they do all this strongly affects the performance and outcomes of their organizations and themselves. Some managers develop a usual way of performing their jobs and achieve some success with a preferred method of leading or a favorite approach to motivating. However, their success will be limited if they always rely on a standard "1-size-fits-all" approach. This is because contingency factors influence the effectiveness of a given approach to managing. The "best" approach depends on contingency factors, including the situation and the people involved. Managers should choose an approach to fit with the changing contingency factors. This article explains why and how managers should develop a contingency approach to managing HCOs. The development of contingency theory is briefly described. Practical application of contingency management is explained for leading, motivating, decision making, and resolving conflict. By using a contingency approach, managers can be more effective when managing their HCOs.

  11. [Physicians' strikes--ethical considerations].

    Science.gov (United States)

    Glick, Shimon; Schwarzfuchs, Dan

    2012-01-01

    Strikes in general represent a solution based on a form of coercion. Historically, the striker caused direct damage to his employer, who was responsible for the perceived unfair treatment of the employee. In the case of strikes in the public sector, the employer is generally not harmed, but innocent citizens suffer in order to pressure the government agencies, a questionable practice from an ethical viewpoint. Physicians' strikes have more serious ethical problems. They cause suffering and death to innocent citizens. They violate the ethical codes to which physicians have committed themselves as professionals, and they seriously impair the trust of the public in physicians. Better and more ethical ways to provide fair compensation for physicians must be employed, perhaps like those used for judges and members of the IDF.

  12. Alternative Forms of Fit in Contingency Theory.

    Science.gov (United States)

    Drazin, Robert; Van de Ven, Andrew H.

    1985-01-01

    This paper examines the selection, interaction, and systems approaches to fit in structural contingency theory. The concepts of fit evaluated may be applied not only to structural contingency theory but to contingency theories in general. (MD)

  13. Contingent Conspiracies: Art, Philosophy, Science

    DEFF Research Database (Denmark)

    Wilson, Alexander

    2013-01-01

    The question of whether creativity comes from being “open” or “closed” to contingent processes, deeply intersects art-historical discourse on authorship, style, technique and practice: from the Greek notion of the Daimon, through commedia dell'arte’s improvised styles and romanticism’s investment......, Hegel) contain a deeper tension between contingency and necessity, often revealed in correlate discussions of the sublime. But as artists find themselves returning again to a concern or care for contingency (a thread running through Heidegger, Levinas and Derrida) or the question how to conspire...... with contingency (Negarestani), they do so today with a new paradigm of scientific knowledge at their disposal. For science too has increasingly been forced to respond to the notion of contingency. Progressively discovering the ubiquity of non-linear dynamics, deterministic chaos and emergent complexity...

  14. Miners' strike 1984-85

    Energy Technology Data Exchange (ETDEWEB)

    Brown, L; Salter, S [comps.

    1985-01-01

    References relating to the 1984-85 UK miners strike are listed under the following subject headings: events and analysis - a chronological record; short term effects - coal stocks and supplies, electricity supplies, financial, industrial and economic; the miners and their leadership; social aspects - civil liberties, media coverage, mining communities, picketing, policing, the future; pit closures. 240 references.

  15. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  16. Contingent post-closure plan, hazardous waste management units at selected maintenance facilities, US Army National Training Center, Fort Irwin, California

    International Nuclear Information System (INIS)

    1992-01-01

    The National Training Center (NTC) at Fort Irwin, California, is a US Army training installation that provides tactical experience for battalion/task forces and squadrons in a mid- to high-intensity combat scenario. Through joint exercises with US Air Force and other services, the NTC also provides a data source for improvements of training doctrines, organization, and equipment. To meet the training and operational needs of the NTC, several maintenance facilities provide general and direct support for mechanical devices, equipment, and vehicles. Maintenance products used at these facilities include fuels, petroleum-based oils, lubricating grease, various degreasing solvents, antifreeze (ethylene glycol), transmission fluid, brake fluid, and hydraulic oil. Used or spent petroleum-based products generated at the maintenance facilities are temporarily accumulated in underground storage tanks (USTs), collected by the NTC hazardous waste management contractor (HAZCO), and stored at the Petroleum, Oil, and Lubricant (POL) Storage Facility, Building 630, until shipped off site to be recovered, reused, and/or reclaimed. Spent degreasing solvents and other hazardous wastes are containerized and stored on-base for up to 90 days at the NTC's Hazardous Waste Storage Facility, Building 703. The US Environmental Protection Agency (EPA) performed an inspection and reviewed the hazardous waste management operations of the NTC. Inspections indicated that the NTC had violated one or more requirements of Subtitle C of the Resource Conservation and Recovery Act (RCRA) and as a result of these violations was issued a Notice of Noncompliance, Notice of Necessity for Conference, and Proposed Compliance Schedule (NON) dated October 13, 1989. The following post-closure plan is the compliance-based approach for the NTC to respond to the regulatory violations cited in the NON

  17. Strikes in Serbia since 2000 to 2005

    OpenAIRE

    Novaković Nada

    2005-01-01

    In this article author deals with main characteristics of strikes in Serbia within the period 2000–2005. Analysis starts with thesis that strike is open class conflict within class divided society. Therefore strike is radical form of trade union struggle for workers rights. Main questions in the analysis were: on social structure as a background of strikes, on organizations and trade unions included in it, on effects of strikes in Serbia in the given period. Main thesis of the article is that...

  18. Respecting the right to strike

    CERN Multimedia

    Staff Association

    2015-01-01

    Since two years the representatives of the employers in the ILO, a tripartite multilateral body responsible for guaranteeing the correct application of an international labour code, try to weaken the global work regulations. On the occasion of the Global Day of Action for the right to strike at the invitation of the Geneva community of Union action (Communauté genevoise d’action syndicale) and the Swiss Trade Union Association (Union syndicale suisse) around noon on Wednesday 18th February some fifty staff representatives of international organizations gathered on the place des Nations in Geneva to reaffirm the importance of this fundamental right, too often flouted. A delegation of the CERN Staff Association was also present. In a short speech, the Staff Association said that, while being one of the fundamental human rights, to be efficient the right to strike must be used intelligently. It must be implemented taking into account the sensitivities of the professional environment and r...

  19. Mobile contingency unit

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Sergio O. da; Magalhaes, Milton P. de [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Junqueira, Rodrigo A.; Torres, Carlos A.R. [PETROBRAS Transporte S/A (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper is aimed at presenting what is already a reality in TRANSPETRO in the area covered by OSBRA, a pipeline that carries by-products to the Mid-West region of Brazil. In order to meet the needs of covering occasional accidents, TRANSPETRO counts on a standardized system of emergency management. It is a great challenge to secure an efficient communication along the 964 km of extension, considering that there are shadow zones where it is not possible to use conventional means of communication such as mobile telephony and internet. It was in this context that the Mobile Contingency Unit Via Satellite - MCU was developed, to extend the communication facilities existing in fixed installations to remote places, mainly the pipeline right of ways. In case of emergency, simulation and work in the pipeline right of way, MCU is fully able to provide the same data, voice, closed-circuit TV and satellite video conference facilities that are available in any internal area of the PETROBRAS system. (author)

  20. Contingency Analysis Post-Processing With Advanced Computing and Visualization

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yousu; Glaesemann, Kurt; Fitzhenry, Erin

    2017-07-01

    Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability and accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.

  1. Resource estimations in contingency planning for FMD

    DEFF Research Database (Denmark)

    Boklund, Anette; Sten, Mortensen; Holm Johansen, Maren

    Based on results from a stochastic simulation model, it was possible to create a simple model in excel to estimate the requirements for personnel and materiel during an FMD outbreak in Denmark. The model can easily be adjusted, when new information on resources appears from management of other cr...

  2. Continuity and Contingency in USAF Posture Planning

    Science.gov (United States)

    2016-01-01

    2007, and Daniel Gardner, Future Babble: Why Pundits Are Hedgehogs and Foxes Know Best, New York: Plume, 2012. 32 or demands considered most...New York: Harper Collins, 1997; and Gabriel Kolko, Anatomy of a War: Vietnam, the United States and the Modern Historical Experience, New York: The...Getler, “ Anatomy of a Failed Mission,” Washington Post, April 27, 1980. 202 Bacevich, 2005, p. 105. 203 Bacevich, 2005, pp. 106–17. Reagan also used

  3. When the Ocean Strikes Back

    DEFF Research Database (Denmark)

    Gebauer, Mirjam

    2013-01-01

    The disaster scenario is one of the predominant settings we find unfold in the pop-cultural imagination, namely in films and novels. In recent years, as increased awareness of environmental issues affect the agendas of public debate, we also see local and increasingly global environmental disasters...... is evolving caused by an intelligent life form of the deep sea striking back at mankind. This article aims at discussing in what ways The Swarm uses elements and patterns of the pop-cultural disaster imagination, specifically the disaster and science fiction movie of the 1990s. Furthermore, it investigates...

  4. Tethered Satellite System Contingency Investigation Board

    Science.gov (United States)

    1992-11-01

    The Tethered Satellite System (TSS-1) was launched aboard the Space Shuttle Atlantis (STS-46) on July 31, 1992. During the attempted on-orbit operations, the Tethered Satellite System failed to deploy successfully beyond 256 meters. The satellite was retrieved successfully and was returned on August 6, 1992. The National Aeronautics and Space Administration (NASA) Associate Administrator for Space Flight formed the Tethered Satellite System (TSS-1) Contingency Investigation Board on August 12, 1992. The TSS-1 Contingency Investigation Board was asked to review the anomalies which occurred, to determine the probable cause, and to recommend corrective measures to prevent recurrence. The board was supported by the TSS Systems Working group as identified in MSFC-TSS-11-90, 'Tethered Satellite System (TSS) Contingency Plan'. The board identified five anomalies for investigation: initial failure to retract the U2 umbilical; initial failure to flyaway; unplanned tether deployment stop at 179 meters; unplanned tether deployment stop at 256 meters; and failure to move tether in either direction at 224 meters. Initial observations of the returned flight hardware revealed evidence of mechanical interference by a bolt with the level wind mechanism travel as well as a helical shaped wrap of tether which indicated that the tether had been unwound from the reel beyond the travel by the level wind mechanism. Examination of the detailed mission events from flight data and mission logs related to the initial failure to flyaway and the failure to move in either direction at 224 meters, together with known preflight concerns regarding slack tether, focused the assessment of these anomalies on the upper tether control mechanism. After the second meeting, the board requested the working group to complete and validate a detailed integrated mission sequence to focus the fault tree analysis on a stuck U2 umbilical, level wind mechanical interference, and slack tether in upper tether

  5. Women, transition and strikes in Serbia

    OpenAIRE

    Novaković, Nada G.

    2014-01-01

    The author, in a sociological way, describes and analyzes the concepts of transition, privatization and strikes in Serbia, particularly the place of women in it. It examines the most important economic and social causes and consequences of these phenomena. The main hypothesis is: women's strikes in the Serbian transition are less efficient than strikes and public protests of women in the developed world and the second Yugoslavia. A strike is a class conflict, in which the workers are fighting...

  6. 14 CFR 35.38 - Lightning strike.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Lightning strike. 35.38 Section 35.38... STANDARDS: PROPELLERS Tests and Inspections § 35.38 Lightning strike. The applicant must demonstrate, by... lightning strike without causing a major or hazardous propeller effect. The limit to which the propeller has...

  7. Rozšíření produktové řady značky Lucky Strike

    OpenAIRE

    Boháč, Radim

    2012-01-01

    The aim of this thesis is a detailed analysis of marketing plan for line extension of Lucky Strike on Czech tobacco market. The theoretical part will be focused on the analysis of a brand, proccess of strategic brand management and marketing planning. The practical part is dedicated to positioning and marketing plan of Lucky Strike.

  8. Strike Operations: Contingency Operations with Light-Heavy-Special Operations Forces.

    Science.gov (United States)

    1991-06-07

    limited." , Requires tim to di.mt and mount. S CS ad CSS pvd• fro higherh q r . 3--63 d- fradley FiO*itir vehicle (BMV Caracteristics : (See FIGTURE 3-2...High Explosive Plastic HET Heavy Equipment Transporter HHC Headquarters,and Headquarters Copany HHSB Headquarters, Headquarters and Service Battery HIC

  9. Inevitability, contingency, and epistemic humility.

    Science.gov (United States)

    Kidd, Ian James

    2016-02-01

    This paper offers an epistemological framework for the debate about whether the results of scientific enquiry are inevitable or contingent. I argue in Sections 2 and 3 that inevitabilist stances are doubly guilty of epistemic hubris--a lack of epistemic humility--and that the real question concerns the scope and strength of our contingentism. The latter stages of the paper-Sections 4 and 5-address some epistemological and historiographical worries and sketch some examples of deep contingencies to guide further debate. I conclude by affirming that the concept of epistemic humility can usefully inform critical reflection on the contingency of the sciences and the practice of history of science. Copyright © 2015 Elsevier Ltd. All rights reserved.

  10. Contingent Employment in the Netherlands

    OpenAIRE

    Pot, F.; Koene, Bas; Paauwe, Jaap

    2001-01-01

    textabstractIn the last decade the Dutch labour market has demonstrated an admirable capacity to generate jobs. Consequently, the unemployment rate has significantly decreased. However, the newly generated jobs are a-typical in the sense that they are not full-time jobs based on open-ended contracts. Instead, the job growth has relied on the growth of part-time and contingent jobs. While the creation of part-time jobs seems to be employee-driven, contingent employment, in contrast, seems to b...

  11. Contingency Theories of Leadership: A Study.

    Science.gov (United States)

    Saha, Sunhir K.

    1979-01-01

    Some of the major contingency theories of leadership are reviewed; some results from the author's study of Fiedler's contingency model are reported; and some thoughts for the future of leadership research are provided. (Author/MLF)

  12. Preemptive strikes: Fear, hope, and defensive aggression.

    Science.gov (United States)

    Halevy, Nir

    2017-02-01

    Preemptive strikes are costly and harmful. Existing models of defensive aggression focus narrowly on the role fear plays in motivating preemptive strikes. Theoretically integrating the literatures on conflict, decision making, and emotion, the current research investigated how specific emotions associated with certainty or uncertainty, including fear, anger, disgust, hope, and happiness, influence preemptive strikes. Study 1 demonstrated that hope negatively predicts defensive exits from relationships in choice dilemmas. Studies 2 and 3 experimentally manipulated risk of being attacked in an incentivized, interactive decision making task-the Preemptive Strike Game. Risk of being attacked fueled preemptive strikes; reduced feelings of hope partially mediated this effect in Study 3. Studies 4 and 5 investigated preemptive strikes under uncertainty (rather than risk). In Study 4, reasoning about the factors that make one trustful of others curbed preemptive strikes; cogitating about the factors that underlie discrete emotions, however, did not influence defensive aggression. Study 5 demonstrated that the valence and uncertainty appraisals of incidental emotions interact in shaping preemptive strikes. Specifically, recalling an autobiographical emotional experience that produced hope significantly decreased attack rates relative to fear, happiness, and a control condition. Fear, anger, disgust, and happiness were either unrelated to preemptive strikes or showed inconsistent relationships with preemptive strikes across the 5 studies. These findings shed light on how emotions shape defensive aggression, advance knowledge on strategic choice under risk and uncertainty, and demonstrate hope's positive effects on social interactions and relationships. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  13. Breakdown concepts for contingency tables

    NARCIS (Netherlands)

    Kuhnt, S.

    2010-01-01

    Loglinear Poisson models are commonly used to analyse contingency tables. So far, robustness of parameter estimators as well as outlier detection have rarely been treated in this context. We start with finite-sample breakdown points. We yield that the breakdown point of mean value estimators

  14. Lessons in Contingent, Recursive Humility

    Science.gov (United States)

    Vagle, Mark D.

    2011-01-01

    In this article, the author argues that critical work in teacher education should begin with teacher educators turning a critical eye on their own practices. The author uses Lesko's conception of contingent, recursive growth and change to analyze a lesson he observed as part of a phenomenological study aimed at understanding more about what it is…

  15. Job satisfaction and contingent employment

    NARCIS (Netherlands)

    de Graaf-Zijl, M.

    2012-01-01

    This paper analyses job satisfaction as an aggregate of satisfaction with several job aspects, with special focus on the influence of contingent-employment contracts. Fixed-effect analysis is applied on a longitudinal sample of Dutch employees in four work arrangements: regular, fixed-term, on-call

  16. A Profile of Contingent Workers.

    Science.gov (United States)

    Polivka, Anne E.

    1996-01-01

    Based on data from the supplement to the February 1995 Current Population Survey, contingent workers were more likely to be female, black, young, enrolled in school, and employed in services and construction industries than were noncontingent workers. More than 10% were teachers. (Author)

  17. How Precarious Is Contingent Work?

    DEFF Research Database (Denmark)

    Scheuer, Steen

    2015-01-01

    agree. This study focuses on a number of non-pay conditions for contingent employees, compared to permanent staff, under the assumption that these conditions are cumulatively negative. The article is based on utilizes a survey of app.4,900 employees (response rate 57%), asking questions concerning...

  18. 48 CFR 18.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contingency operation. 18... METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 18.201 Contingency operation. (a) Contingency operation is defined in 2.101. (b) Micro-purchase threshold. The threshold...

  19. 48 CFR 218.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contingency operation. 218... Flexibilities 218.201 Contingency operation. (1) Selection, appointment, and termination of appointment... in a contingency contracting force. See 201.603-2(2). (2) Policy for unique item identification...

  20. 2018 NDIA Precision Strike Annual Review (PSAR-18)

    Science.gov (United States)

    2018-03-20

    Planning Agenda as of 9 MAR 18 Ginny Sniegon: 703-575-6653 PRECISION STRIKE ANNUAL REVIEW (PSAR-18) 20 MARCH 2018...Ginny Sniegon PSA Programs Vice-Chair: Captain David “Jumbo” Baird, USN Annual Review Chair: Kurt Chankaya Congressional & William J. Perry...0745 PSA ANNUAL REVIEW WELCOME: Ken Masson—PSA Chairman 0755 PSAR-18 OPENING REMARKS: Kurt Chankaya—PSAR-18 Event Chair 0800 CONGRESSIONAL

  1. Fuzzy-set based contingency ranking

    International Nuclear Information System (INIS)

    Hsu, Y.Y.; Kuo, H.C.

    1992-01-01

    In this paper, a new approach based on fuzzy set theory is developed for contingency ranking of Taiwan power system. To examine whether a power system can remain in a secure and reliable operating state under contingency conditions, those contingency cases that will result in loss-of-load, loss-of generation, or islanding are first identified. Then 1P-1Q iteration of fast decoupled load flow is preformed to estimate post-contingent quantities (line flows, bus voltages) for other contingency cases. Based on system operators' past experience, each post-contingent quantity is assigned a degree of severity according to the potential damage that could be imposed on the power system by the quantity, should the contingency occurs. An approach based on fuzzy set theory is developed to deal with the imprecision of linguistic terms

  2. Geological Effects on Lightning Strike Distributions

    KAUST Repository

    Berdahl, J. Scott

    2016-05-16

    Recent advances in lightning detection networks allow for detailed mapping of lightning flash locations. Longstanding rumors of geological influence on cloud-to-ground (CG) lightning distribution and recent commercial claims based on such influence can now be tested empirically. If present, such influence could represent a new, cheap and efficient geophysical tool with applications in mineral, hydrothermal and oil exploration, regional geological mapping, and infrastructure planning. This project applies statistical analysis to lightning data collected by the United States National Lightning Detection Network from 2006 through 2015 in order to assess whether the huge range in electrical conductivities of geological materials plays a role in the spatial distribution of CG lightning. CG flash densities are mapped for twelve areas in the contiguous United States and compared to elevation and geology, as well as to the locations of faults, railroads and tall towers including wind turbines. Overall spatial randomness is assessed, along with spatial correlation of attributes. Negative and positive polarity lightning are considered separately and together. Topography and tower locations show a strong influence on CG distribution patterns. Geology, faults and railroads do not. This suggests that ground conductivity is not an important factor in determining lightning strike location on scales larger than current flash location accuracies, which are generally several hundred meters. Once a lightning channel is established, however, ground properties at the contact point may play a role in determining properties of the subsequent stroke.

  3. Contingency Operations of Americas Next Moon Rocket, Ares V

    Science.gov (United States)

    Jaap, John; Richardson, Lea

    2010-01-01

    and cause of a partially separated payload shroud. Other mitigations are really alternate missions; example, an engine out on during ascent resulted in insufficient propellant for the lunar mission, but the on-orbit vehicle stack is otherwise perfect and can pursue an alternate mission, such as a high ballistic trajectory to test the high-speed atmospheric reentry of Orion. Evaluation and presentation of contingency operations at this early stage of the development of the Ares V rocket will improve the design of the vehicle and lay the groundwork for the exhaustive contingency planning which must be done after the vehicle is built as preparations for operations.

  4. Estimating the Impact of Bird Strikes

    NARCIS (Netherlands)

    Metz, I.C.; Muhlhausen, Thorsten; Ellerbroek, J.; Hoekstra, J.M.

    2018-01-01

    Bird strikes have the potential to cause severe damage to aircraft. Therefore, measures to reduce the risk of bird strikes are performed at airports. However, this risk is not limited to the airport but is increased in the arrival and departure corridors as well. Consequently, a significant amount

  5. Option Strike Price and Managerial Investment Decisions

    Institute of Scientific and Technical Information of China (English)

    刘鸿雁; 张维

    2003-01-01

    The manager′s investment decisions is modeled when the manager is risk-averse and has stock options as compensation. It is found that the strike price of options is crucial to the investment incentives of managers, and that the correct value, or interval of values, of managerial stock option strike price can bring stockholder and manager interests in agreement.

  6. Effective operational oil spill response planning

    International Nuclear Information System (INIS)

    Meyers, R.J.

    1991-01-01

    An operational Contingency Plan is one of the single most important aspects of effective oil spill response operations. It is a spill control game plan. A thorough contingency plan provides a set of guidelines that can be used to help direct all phases of spill response activities. More than simple a compilation of lists and rosters, the contingency plan reflects strategic and philosophical elements of spill response that help to ensure a viable response to any spill incident. Facilities and oil carrying vessels should have well maintained contingency plans with these features. This paper describes the requirement for effective oil spill response pans and the training required to exercise them

  7. Counterfactual reasoning for regretted situations involving controllable versus uncontrollable events: the modulating role of contingent self-esteem.

    Science.gov (United States)

    Wilkinson, Meredith R; Ball, Linden J; Alford, David

    2015-01-01

    We report a study that examined the modulating impact of contingent self-esteem on regret intensity for regretted outcomes associated with controllable versus uncontrollable events. The Contingent Self-Esteem Scale (e.g., Kernis & Goldman, 2006) was used to assess the extent to which a person's sense of self-worth is based on self and others' expectations. We found that there was an influence of self-esteem contingency for controllable but not for uncontrollable regret types. For controllable regret types individuals with a high contingent (i.e., unstable) self-esteem reported greater regret intensity than those with a low contingent (i.e., stable) self-esteem. We interpret this finding as reflecting a functional and adaptive role of high contingent self-esteem in terms of mobilizing the application of counterfactual reasoning and planning mechanisms that can enable personal expectations to be achieved in the future.

  8. Counterfactual Reasoning for Regretted Situations Involving Controllable Versus Uncontrollable Events: The Modulating Role of Contingent Self-Esteem

    Science.gov (United States)

    Wilkinson, Meredith R.; Ball, Linden J.; Alford, David

    2015-01-01

    We report a study that examined the modulating impact of contingent self-esteem on regret intensity for regretted outcomes associated with controllable versus uncontrollable events. The Contingent Self-Esteem Scale (e.g., Kernis & Goldman, 2006) was used to assess the extent to which a person’s sense of self-worth is based on self and others’ expectations. We found that there was an influence of self-esteem contingency for controllable but not for uncontrollable regret types. For controllable regret types individuals with a high contingent (i.e., unstable) self-esteem reported greater regret intensity than those with a low contingent (i.e., stable) self-esteem. We interpret this finding as reflecting a functional and adaptive role of high contingent self-esteem in terms of mobilizing the application of counterfactual reasoning and planning mechanisms that can enable personal expectations to be achieved in the future. PMID:25883697

  9. Contingent factors affecting network learning

    OpenAIRE

    Peters, Linda D.; Pressey, Andrew D.; Johnston, Wesley J.

    2016-01-01

    To increase understanding of the impact of individuals on organizational learning processes, this paper explores the impact of individual cognition and action on the absorptive capacity process of the wider network. In particular this study shows how contingent factors such as social integration mechanisms and power relationships influence how network members engage in, and benefit from, learning. The use of cognitive consistency and sensemaking theory enables examination of how these conting...

  10. Suited Contingency Ops Food - 2

    Science.gov (United States)

    Glass, J. W.; Leong, M. L.; Douglas, G. L.

    2014-01-01

    The contingency scenario for an emergency cabin depressurization event may require crewmembers to subsist in a pressurized suit for up to 144 hours. This scenario requires the capability for safe nutrition delivery through a helmet feed port against a 4 psi pressure differential to enable crewmembers to maintain strength and cognition to perform critical tasks. Two nutritional delivery prototypes were developed and analyzed for compatibility with the helmet feed port interface and for operational effectiveness against the pressure differential. The bag-in-bag (BiB) prototype, designed to equalize the suit pressure with the beverage pouch and enable a crewmember to drink normally, delivered water successfully to three different subjects in suits pressurized to 4 psi. The Boa restrainer pouch, designed to provide mechanical leverage to overcome the pressure differential, did not operate sufficiently. Guidelines were developed and compiled for contingency beverages that provide macro-nutritional requirements, a minimum one-year shelf life, and compatibility with the delivery hardware. Evaluation results and food product parameters have the potential to be used to improve future prototype designs and develop complete nutritional beverages for contingency events. These feeding capabilities would have additional use on extended surface mission EVAs, where the current in-suit drinking device may be insufficient.

  11. Some Tests for Evaluation of Contingency Tables (for Biomedical Applications)

    Czech Academy of Sciences Publication Activity Database

    Kalina, Jan

    2011-01-01

    Roč. 7, č. 1 (2011), s. 37-50 ISSN 1336-9180 R&D Projects: GA MŠk(CZ) 1M06014 Institutional research plan: CEZ:AV0Z10300504 Keywords : contingency tables * hypothesis testing Subject RIV: BB - Applied Statistics , Operational Research http://jamsi.fpv.ucm.sk/docs/v07n01_05_2011/v07_n01_03_KALINA.pdf

  12. Lightning Strike in Pregnancy With Fetal Injury.

    Science.gov (United States)

    Galster, Kellen; Hodnick, Ryan; Berkeley, Ross P

    2016-06-01

    Injuries from lightning strikes are an infrequent occurrence, and are only rarely noted to involve pregnant victims. Only 13 cases of lightning strike in pregnancy have been previously described in the medical literature, along with 7 additional cases discovered within news media reports. This case report presents a novel case of lightning-associated injury in a patient in the third trimester of pregnancy, resulting in fetal ischemic brain injury and long-term morbidity, and reviews the mechanics of lightning strikes along with common injury patterns of which emergency providers should be aware. Copyright © 2016 Wilderness Medical Society. Published by Elsevier Inc. All rights reserved.

  13. Expeditionary Strike Group: Command Structure Design Support

    National Research Council Canada - National Science Library

    Hutchins, Susan G; Kemple, William G; Kleinman, David L; Hocevar, Susan P

    2005-01-01

    An Expeditionary Strike Group (ESG) is a new capability mix that combines the combat power of three surface combatants and one submarine with an Amphibious Readiness Group/ Marine Expeditionary Unit...

  14. Feature Hepatitis: Hepatitis Can Strike Anyone

    Science.gov (United States)

    ... Navigation Bar Home Current Issue Past Issues Feature Hepatitis Hepatitis Can Strike Anyone Past Issues / Spring 2009 Table ... from all walks of life are affected by hepatitis, especially hepatitis C, the most common form of ...

  15. Pavlovian contingencies and temporal information.

    Science.gov (United States)

    Balsam, Peter D; Fairhurst, Stephen; Gallistel, Charles R

    2006-07-01

    The effects of altering the contingency between the conditioned stimulus (CS) and the unconditioned stimulus (US) on the acquisition of autoshaped responding was investigated by changing the frequency of unsignaled USs during the intertrial interval. The addition of the unsignaled USs had an effect on acquisition speed comparable with that of massing trials. The effects of these manipulations can be understood in terms of their effect on the amount of information (number of bits) that the average CS conveys to the subject about the timing of the next US. The number of reinforced CSs prior to acquisition is inversely related to the information content of the CS.

  16. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  17. Review of the Lightning Strike Incident at Launch Complex 37 on July 27, 1967, and Comparison to a Gemini Lightning Strike

    Science.gov (United States)

    Llewellyn, J. A.

    1967-01-01

    The Launch Complex 37 lightning strike of July 27, 1967, was reviewed and compared to a similar incident on the Gemini Program. Available data indicate little likelihood of damaging currents having been present in SA-204 Launch Vehicle or the ground equipment during the July 27th incident. Based on the results of subsystem and system testing after the strike, anticipated results of future testing, the six months elapsed time between the strike-and launch, and the fact that much of the critical airborne electrical/electronic equipment has been removed since the strike for other reasons, no new actions are considered necessary at this time in the Gemini case, significant failures occurred in both airborne and ground circuits. Due to the resultant semi, condlictor uncertainty, and the relatively' short time prior to planned launch, all critical airborne components containing semiconduetors were replaced, and a sophisticated data comparison task was implemented.

  18. Contingent Diversity on Anthropic Landscapes

    Directory of Open Access Journals (Sweden)

    William Balée

    2010-02-01

    Full Text Available Behaviorally modern human beings have lived in Amazonia for thousands of years. Significant dynamics in species turnovers due to human-mediated disturbance were associated with the ultimate emergence and expansion of agrarian technologies in prehistory. Such disturbances initiated primary and secondary landscape transformations in various locales of the Amazon region. Diversity in these locales can be understood by accepting the initial premise of contingency, expressed as unprecedented human agency and human history. These effects can be accessed through the archaeological record and in the study of living languages. In addition, landscape transformation can be demonstrated in the study of traditional knowledge (TK. One way of elucidating TK distinctions between anthropic and nonanthropic landscapes concerns elicitation of differential labeling of these landscapes and more significantly, elicitation of the specific contents, such as trees, occurring in these landscapes. Freelisting is a method which can be used to distinguish the differential species compositions of landscapes resulting from human-mediated disturbance vs. those which do not evince records of human agency and history. The TK of the Ka’apor Indians of Amazonian Brazil as revealed in freelisting exercises shows differentiation of anthropogenic from high forests as well as a recognition of diversity in the anthropogenic forests. This suggests that the agents of human-mediated disturbance and landscape transformation in traditional Amazonia encode diversity and contingency into their TK, which encoding reflects past cultural influence on landscape and society over time.

  19. Women, transition and strikes in Serbia

    Directory of Open Access Journals (Sweden)

    Novaković Nada G.

    2014-01-01

    Full Text Available The author, in a sociological way, describes and analyzes the concepts of transition, privatization and strikes in Serbia, particularly the place of women in it. It examines the most important economic and social causes and consequences of these phenomena. The main hypothesis is: women's strikes in the Serbian transition are less efficient than strikes and public protests of women in the developed world and the second Yugoslavia. A strike is a class conflict, in which the workers are fighting for their social and economic rights, threatened by the capitalist class. Elites in government and state authorities protect the interests of big capital at the detriment of the interests of the majority of workers. Exploring women's strikes in transition reveals the nature of the social and political system. Their strikes in enterprises, the blocking of public spaces and public protests are systemic, ie. class determined. As the transition was very fast, the resistance of the strikers was inefficient, and the protests of women became an expression of desperation against the loss of jobs and basic resources for lifehood. In short, this research is about the main causes, the organizational forms and the consequences of strikes in which the majority were women. For this purpose, the author chose to describe an array of strikes in the industries and the companies where women are most employed. The choice of strikes in the economic sector is not accidental, but a consequence of the fact that the women there were the most vulnerable. Women in public institutions and companies had much higher financial and social position. They are less likely to strike and publicly protested. After 2000, these strikes were more successful than worker's strikes in textile, food processing, manufacturing and trade. Relationship between the government and the public towards them was tainted by self-interest and selective. The main criterion for the selection of companies and

  20. 48 CFR 1318.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contingency operation. 1318.201 Section 1318.201 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 1318.201 Contingency...

  1. 7 CFR 457.9 - Appropriation contingency.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Appropriation contingency. 457.9 Section 457.9 Agriculture Regulations of the Department of Agriculture (Continued) FEDERAL CROP INSURANCE CORPORATION, DEPARTMENT OF AGRICULTURE COMMON CROP INSURANCE REGULATIONS § 457.9 Appropriation contingency...

  2. Reporting, Recording, and Transferring Contingency Demand Data

    National Research Council Canada - National Science Library

    Smith, Bernard

    2000-01-01

    .... In this report, we develop a standard set of procedures for reporting and recording demand data at the contingency location and transferring contingency demand data to the home base - ensuring proper level allocation and valid worldwide peacetime operating stock (POS) and readiness spares package (RSP) requirements.

  3. Contingent and Alternative Work Arrangements, Defined.

    Science.gov (United States)

    Polivka, Anne E.

    1996-01-01

    Discusses the definitions of contingent workers and alternative work arrangements used by the Bureau of Labor Statistics to analyze data, and presents aggregate estimates of the number of workers in each group. Discusses the overlap between contingent workers and workers in alternative arrangements. (Author/JOW)

  4. Contingency management: perspectives of Australian service providers.

    Science.gov (United States)

    Cameron, Jacqui; Ritter, Alison

    2007-03-01

    Given the very positive and extensive research evidence demonstrating efficacy and effectiveness of contingency management, it is important that Australia explore whether contingency management has a role to play in our own treatment context. Qualitative interviews were conducted with 30 experienced alcohol and drug practitioners, service managers and policy-makers in Victoria. Interviewees were selected to represent the range of drug treatment services types and included rural representation. A semi-structured interview schedule, covering their perceptions and practices of contingency management was used. All interviews were transcribed verbatim and analysed using N2 qualitative data analysis program. The majority of key informants were positively inclined toward contingency management, notwithstanding some concerns about the philosophical underpinnings. Concerns were raised in relation to the use of monetary rewards. Examples of the use of contingency management provided by key informants demonstrated an over-inclusive definition: all the examples did not adhere to the key principles of contingency management. This may create problems if a structured contingency management were to be introduced in Australia. Contingency management is an important adjunctive treatment intervention and its use in Australia has the potential to enhance treatment outcomes. No unmanageable barriers were identified in this study.

  5. Contingent Attentional Capture by Conceptually Relevant Images

    Science.gov (United States)

    Wyble, Brad; Folk, Charles; Potter, Mary C.

    2013-01-01

    Attentional capture is an unintentional shift of visuospatial attention to the location of a distractor that is either highly salient, or relevant to the current task set. The latter situation is referred to as contingent capture, in that the effect is contingent on a match between characteristics of the stimuli and the task-defined…

  6. Thevenin Equivalent Method for Dynamic Contingency Assessment

    DEFF Research Database (Denmark)

    Møller, Jakob Glarbo; Jóhannsson, Hjörtur; Østergaard, Jacob

    2015-01-01

    A method that exploits Thevenin equivalent representation for obtaining post-contingency steady-state nodal voltages is integrated with a method of detecting post-contingency aperiodic small-signal instability. The task of integrating stability assessment with contingency assessment is challenged...... by the cases of unstable post-contingency conditions. For unstable postcontingency conditions there exists no credible steady-state which can be used for basis of a stability assessment. This paper demonstrates how Thevenin Equivalent methods can be applied in algebraic representation of such bifurcation...... points which may be used in assessment of post-contingency aperiodic small-signal stability. The assessment method is introduced with a numeric example....

  7. When Push Comes to Shove: Strikes in Higher Education.

    Science.gov (United States)

    Magney, John

    2002-01-01

    To provide a better sense of how academic unions handle a strike situation, examines six unions who, between 1996 and 2000, went through strikes. Discusses the key issues and outcomes of the strikes. (EV)

  8. Historical Contingency in Controlled Evolution

    Science.gov (United States)

    Schuster, Peter

    2014-12-01

    A basic question in evolution is dealing with the nature of an evolutionary memory. At thermodynamic equilibrium, at stable stationary states or other stable attractors the memory on the path leading to the long-time solution is erased, at least in part. Similar arguments hold for unique optima. Optimality in biology is discussed on the basis of microbial metabolism. Biology, on the other hand, is characterized by historical contingency, which has recently become accessible to experimental test in bacterial populations evolving under controlled conditions. Computer simulations give additional insight into the nature of the evolutionary memory, which is ultimately caused by the enormous space of possibilities that is so large that it escapes all attempts of visualization. In essence, this contribution is dealing with two questions of current evolutionary theory: (i) Are organisms operating at optimal performance? and (ii) How is the evolutionary memory built up in populations?

  9. 33 CFR 154.1030 - General response plan contents.

    Science.gov (United States)

    2010-07-01

    ... and health plan. (vi) List of acronyms and definitions. (vii) A geographic-specific appendix for each... the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (40 CFR part 300) and the Area Contingency Plan(s) (ACP) covering the area in which the facility operates. Facility owners or...

  10. Petroleum taxation under uncertainty - contingent claims

    International Nuclear Information System (INIS)

    Lund, D.

    1990-01-01

    A workable method for the analysis of incentive effects of petroleum taxes under uncertainty is presented. The main advantage of the method is that it concludes with a single number for the after-tax value of any development plan, and thus allows for a quantification of incentive effects for any given description of production possibilities. It is, however, not possible to describe tax effects under uncertainty by simple magnitudes independent of production possibilities, such as wedges in rates of return. The theoretical basis is the contingent claims analysis from finance theory, which is applicable in particular to companies that are owned by well-diversified shareholders. It is not obvious that the tax authorities of poorly diversified countries should value uncertain income streams by the same method. The Norwegian petroleum taxation is shown to have strongly distortionary effects compared to a no-tax situation or a cash flow tax. These distortions were reduced by the tax changes that followed the 1986 decreases in crude oil prices. A weakness of the model of the Norwegian system is that an exactly optimal financial policy for the company has not been found. 30 refs., 2 figs., 3 tabs

  11. Equilibria of perceptrons for simple contingency problems.

    Science.gov (United States)

    Dawson, Michael R W; Dupuis, Brian

    2012-08-01

    The contingency between cues and outcomes is fundamentally important to theories of causal reasoning and to theories of associative learning. Researchers have computed the equilibria of Rescorla-Wagner models for a variety of contingency problems, and have used these equilibria to identify situations in which the Rescorla-Wagner model is consistent, or inconsistent, with normative models of contingency. Mathematical analyses that directly compare artificial neural networks to contingency theory have not been performed, because of the assumed equivalence between the Rescorla-Wagner learning rule and the delta rule training of artificial neural networks. However, recent results indicate that this equivalence is not as straightforward as typically assumed, suggesting a strong need for mathematical accounts of how networks deal with contingency problems. One such analysis is presented here, where it is proven that the structure of the equilibrium for a simple network trained on a basic contingency problem is quite different from the structure of the equilibrium for a Rescorla-Wagner model faced with the same problem. However, these structural differences lead to functionally equivalent behavior. The implications of this result for the relationships between associative learning, contingency theory, and connectionism are discussed.

  12. ACCOUNTING FOR CONTINGENT CONSIDERATIONS IN BUSINESS COMBINATIONS

    Directory of Open Access Journals (Sweden)

    Gurgen KALASHYAN

    2017-07-01

    Full Text Available According to IFRS 3 Business Combinations contingent considerations must be included in the total consideration given for the acquired entity along with cash, other assets, ordinary or preference equity instruments, options, warrants. The contingent consideration is the determined amount which acquiring entity has to pay to acquired entity provided, that certain conditions will be fulfilled in the future. In case the provisions are not satisfied, we will get the situation when the amount of contingent consideration has been included in the total consideration given in the business combination, but in fact, the acquirer has not paid that amount. In its turn, the acquired entity will recognize the contingent consideration as a financial asset according to IFRS 9 Financial Instruments. In that case, it would be appropriately to recognize the contingent consideration as a contingent asset applying IAS 37. In the Article the author will explore the challenges of contingent consideration accounting and suggest the ways of solving the above mentioned problems.

  13. effect of strikes on management and planning of educational ...

    African Journals Online (AJOL)

    Global Journal

    Ltd. This work is licensed under Creative Commons Attribution 4.0 International license. .... is workers' refusal to work as protest for ... suspended during the last week of December,. 2013. .... compressed and parts of the curriculum skipped,.

  14. Conventional Prompt Global Strike: Capabilities Today While Planning for Tomorrow

    Science.gov (United States)

    2012-03-19

    I hOu< pet tesponse, ll’ldud;ng tho trno lOt tevio-•,ng instructions, s<>arc/1Jng oxi•tong data sources, gathenng and mai"tain•ng the data needeo...are politically sensitive. 3. The ability to destroy both a traditionally constructed brick and mortar building, and a deeply buried underground...seconds. This technology is setting the foundation for hypersonic application ”17 and could power a hypersonic CPGS delivery vehicle. NASA describes a

  15. Impact of lightning strikes on hospital functions.

    Science.gov (United States)

    Mortelmans, Luc J M; Van Springel, Gert L J; Van Boxstael, Sam; Herrijgers, Jan; Hoflacks, Stefaan

    2009-01-01

    Two regional hospitals were struck by lightning during a one-month period. The first hospital, which had 236 beds, suffered a direct strike to the building. This resulted in a direct spread of the power peak and temporary failure of the standard power supply. The principle problems, after restoring standard power supply, were with the fire alarm system and peripheral network connections in the digital radiology systems. No direct impact on the hardware could be found. Restarting the servers resolved all problems. The second hospital, which had 436 beds, had a lightning strike on the premises and mainly experienced problems due to induction. All affected installations had a cable connection from outside in one way or another. The power supplies never were endangered. The main problem was the failure of different communication systems (telephone, radio, intercom, fire alarm system). Also, the electronic entrance control went out. During the days after the lightening strike, multiple software problems became apparent, as well as failures of the network connections controlling the technical support systems. There are very few ways to prepare for induction problems. The use of fiber-optic networks can limit damage. To the knowledge of the authors, these are the first cases of lightning striking hospitals in medical literature.

  16. The Corps Engineer Battalion in Contingency Operations

    National Research Council Canada - National Science Library

    Raymer, James

    2001-01-01

    .... The central research question asks: Is the proposed echelons above division engineer battalion design a better one for active and reserve component corps engineer forces to respond in a contingency...

  17. Strategy as Mutually Contingent Choice

    Directory of Open Access Journals (Sweden)

    Neil Martin

    2016-05-01

    Full Text Available Thomas Schelling’s The Strategy of Conflict carries significant behavioral implications which have been overlooked by economic readers. I argue that these implications are central to Schelling’s vision of game theory, that they fit well with recent advances in experimental psychology and behavioral economics, and provide a comprehensive framework that can inform research on strategy. In my view, Schelling develops a non-mathematical approach to strategy which anticipates on Gigerenzer and Selten’s “ecological rationality” program. This approach maps the processes involved in strategic reasoning and highlights their reliance on the particular information structure of interactive social environments. Building on this approach, I model strategy as a heuristic form of reasoning that governs the way in which individuals search for and provide cues in situations of mutually contingent choice. I conclude by examining how the reference to ecological rationality can help clarify Schelling’s contribution to game theory and outline potential avenues of research into strategic reasoning and interaction.

  18. Probabilistic real-time contingency ranking method

    International Nuclear Information System (INIS)

    Mijuskovic, N.A.; Stojnic, D.

    2000-01-01

    This paper describes a real-time contingency method based on a probabilistic index-expected energy not supplied. This way it is possible to take into account the stochastic nature of the electric power system equipment outages. This approach enables more comprehensive ranking of contingencies and it is possible to form reliability cost values that can form the basis for hourly spot price calculations. The electric power system of Serbia is used as an example for the method proposed. (author)

  19. ACCOUNTING FOR CONTINGENT CONSIDERATIONS IN BUSINESS COMBINATIONS

    OpenAIRE

    Gurgen KALASHYAN

    2017-01-01

    According to IFRS 3 Business Combinations contingent considerations must be included in the total consideration given for the acquired entity along with cash, other assets, ordinary or preference equity instruments, options, warrants. The contingent consideration is the determined amount which acquiring entity has to pay to acquired entity provided, that certain conditions will be fulfilled in the future. In case the provisions are not satisfied, we will get the situation when the amount of c...

  20. The Contingent Value of Organizational Integration

    Directory of Open Access Journals (Sweden)

    Virpi Turkulainen

    2013-08-01

    Full Text Available We elaborate the link between organizational design and effectiveness by examining organizational integration and performance in the context of modern manufacturing. Through careful contextualization and empirical analysis of 266 manufacturing organizations in three industries and nine countries, we uncover a joint effect of integration and complexity on organizational effectiveness. The results extend structural contingency theory, in particular the mechanisms that link organizational integration to organizational effectiveness. We conclude by discussing the continuing relevance of structural contingency theory.

  1. Central hyperadrenergic state after lightning strike.

    Science.gov (United States)

    Parsaik, Ajay K; Ahlskog, J Eric; Singer, Wolfgang; Gelfman, Russell; Sheldon, Seth H; Seime, Richard J; Craft, Jennifer M; Staab, Jeffrey P; Kantor, Birgit; Low, Phillip A

    2013-08-01

    To describe and review autonomic complications of lightning strike. Case report and laboratory data including autonomic function tests in a subject who was struck by lightning. A 24-year-old man was struck by lightning. Following that, he developed dysautonomia, with persistent inappropriate sinus tachycardia and autonomic storms, as well as posttraumatic stress disorder (PTSD) and functional neurologic problems. The combination of persistent sinus tachycardia and episodic exacerbations associated with hypertension, diaphoresis, and agitation was highly suggestive of a central hyperadrenergic state with superimposed autonomic storms. Whether the additional PTSD and functional neurologic deficits were due to a direct effect of the lightning strike on the central nervous system or a secondary response is open to speculation.

  2. ["Bell-striking" Saying of Acupuncture Therapy].

    Science.gov (United States)

    Zhao, Jing-Sheng

    2017-04-25

    As an analogy, a prototype of "bell-striking" is proposed in the present paper for exploring the basic properties, major elements, and potential mechanisms of acupuncture stimulation. On the strength of analysis on the physiological basis of acupuncture effect, several fundamental aspects of acupuncture are summarized as a) the body-surface stimulating characters, b) general and local effects, and c) triggering the auto-regulative function of the organism, which mimics the "bell-striking" response. Namely, when stroke, bell will chime, otherwise, chiming will not be heard. During analyzing special contents of acupuncture theory, its formative background should not be separated, and it is improper to take, modern medical theory of the human body as the guiding thinking way for researching the ancient Chinese medical literature.

  3. Proliferation of Precision Strike: Issues for Congress

    Science.gov (United States)

    2012-05-14

    industrial base. Finally, should Congress legislate requirements for DOD to develop precision strike countermeasures and then provide funding for that...Defense, Part 187 – Environmental Effects Abroad of Major Department of Defense Actions, Section 187.3: Definitions. 32 Bryan Clark and Dan Whiteneck...so many missiles ... referring to reports of Venezuelan arms flowing to Colombian guerrillas.... The Chavez regime also has close ties with

  4. Stress distribution of metatarsals during forefoot strike versus rearfoot strike: A finite element study.

    Science.gov (United States)

    Li, Shudong; Zhang, Yan; Gu, Yaodong; Ren, James

    2017-12-01

    Due to the limitations of experimental approaches, comparison of the internal deformation and stresses of the human man foot between forefoot and rearfoot landing is not fully established. The objective of this work is to develop an effective FE modelling approach to comparatively study the stresses and energy in the foot during forefoot strike (FS) and rearfoot strike (RS). The stress level and rate of stress increase in the Metatarsals are established and the injury risk between these two landing styles is evaluated and discussed. A detailed subject specific FE foot model is developed and validated. A hexahedral dominated meshing scheme was applied on the surface of the foot bones and skin. An explicit solver (Abaqus/Explicit) was used to stimulate the transient landing process. The deformation and internal energy of the foot and stresses in the metatarsals are comparatively investigated. The results for forefoot strike tests showed an overall higher average stress level in the metatarsals during the entire landing cycle than that for rearfoot strike. The increase rate of the metatarsal stress from the 0.5 body weight (BW) to 2 BW load point is 30.76% for forefoot strike and 21.39% for rearfoot strike. The maximum rate of stress increase among the five metatarsals is observed on the 1st metatarsal in both landing modes. The results indicate that high stress level during forefoot landing phase may increase potential of metatarsal injuries. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. Gait Retraining From Rearfoot Strike to Forefoot Strike does not change Running Economy.

    Science.gov (United States)

    Roper, Jenevieve Lynn; Doerfler, Deborah; Kravitz, Len; Dufek, Janet S; Mermier, Christine

    2017-12-01

    Gait retraining is a method for management of patellofemoral pain, which is a common ailment among recreational runners. The present study investigated the effects of gait retraining from rearfoot strike to forefoot strike on running economy, heart rate, and respiratory exchange ratio immediately post-retraining and one-month post-retraining in recreational runners with patellofemoral pain. Knee pain was also measured. Sixteen participants (n=16) were randomly placed in the control (n=8) or experimental (n=8) group. A 10-minute treadmill RE test was performed by all subjects. The experimental group performed eight gait retraining running sessions where foot strike pattern was switched from rearfoot strike to forefoot strike, while the control group received no intervention. There were no significant differences for running economy (p=0.26), respiratory exchange ratio (p=0.258), or heart rate (p=0.248) between the groups. Knee pain reported on a visual analog scale was also significantly reduced (pstrike to forefoot strike did not affect running economy up to one-month post-retraining while reducing running-related patellofemoral pain. © Georg Thieme Verlag KG Stuttgart · New York.

  6. Pension regulation and the market value of pension liabilities - A contingent claims analysis using Parisian options

    NARCIS (Netherlands)

    Broeders, D.; Chen, A.

    2008-01-01

    We analyze the market-consistent valuation of pension liabilities in a contingent claim framework whereby a knock-out barrier feature is applied to capture early regulatory closure of a pension plan. We investigate two cases which we call "immediate closure procedure" and "delayed closure

  7. A Contingent Analysis of the Relationship between IS Implementation Strategies and IS Success.

    Science.gov (United States)

    Kim, Sang-Hoon; Lee, Jinjoo

    1991-01-01

    Considers approaches to dealing with user attitudes toward newly implemented information systems (IS), and suggests that behavioral management strategies relevant to IS fall into three categories: (1) empirical/rational; (2) normative/reeducative; and (3) power/coercive, based on "planned change" theories. An integrative contingent model…

  8. Explaining the discrepancy between intentions and actions: the case of hypothetical bias in contingent valuation

    Science.gov (United States)

    Icek Ajzen; Thomas C. Brown; Franklin Carvajal

    2004-01-01

    An experiment was designed to account for intention-behavior discrepancies by applying the theory of planned behavior to contingent valuation. College students (N = 160) voted in hypothetical and real payment referenda to contribute $8 to a scholarship fund. Overestimates of willingness to pay in the hypothetical referendum could not be attributed to moderately...

  9. 75 FR 54773 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO...

    Science.gov (United States)

    2010-09-09

    .... Monitoring Network and Verification of Continued Attainment 4. Contingency Plan 5. Conformity Determination... maintenance plan to EPA on June 16, 2010. B. Limited Maintenance Plan The definition, general requirements... Continued Attainment, Contingency Plan, and Conformity Determinations Under Limited Maintenance Plans. These...

  10. The state of art of contingency and emergency plans for oil spill in the Brazilian ports and terminals; O estado da arte dos planos de emergencia e contingencia para derramamento de oleo nos portos e terminais brasileiros

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Sergio R.; Wasserman, Julio C.; Lima, Gilson B.A. [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2008-07-01

    Brazilian legislation establishes that the potentially polluting activities, as is the case of the ports and terminals, possess plans of emergency for spilling in order to prevent impacts to the physical, socio cultural and of the work environment. The Federal Law n. 9966, of April 2000, known as the 'Law of the Oil' established the basic principles, to be obeyed for the companies, for harmful or dangerous oil movement and other substances in ports, terminals, platforms and ships in waters under national jurisdiction. The Law defines that the emergency plans are a set of measures that determine the responsibilities and the actions to be unchained after an incident immediately, as well as define the human resources, material and adequate equipment to the prevention, has controlled and combat to the pollution of waters. The CONAMA n. 398, of June of 2008, create a standardization of those procedures, so that there is an integration among the several emergency plans in a certain area. This article has for objective to accomplish a diagnosis in the several institutional programs of emergency to identify the current situation in the organized and terminal ports specialized in liquid barns, evaluating, when possible, it rationality of support logistic, the organization of operational administration and integration. (author)

  11. The state of art of contingency and emergency plans for oil spill in the Brazilian ports and terminals; O estado da arte dos planos de emergencia e contingencia para derramamento de oleo nos portos e terminais brasileiros

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Sergio R; Wasserman, Julio C; Lima, Gilson B.A. [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2008-07-01

    Brazilian legislation establishes that the potentially polluting activities, as is the case of the ports and terminals, possess plans of emergency for spilling in order to prevent impacts to the physical, socio cultural and of the work environment. The Federal Law n. 9966, of April 2000, known as the 'Law of the Oil' established the basic principles, to be obeyed for the companies, for harmful or dangerous oil movement and other substances in ports, terminals, platforms and ships in waters under national jurisdiction. The Law defines that the emergency plans are a set of measures that determine the responsibilities and the actions to be unchained after an incident immediately, as well as define the human resources, material and adequate equipment to the prevention, has controlled and combat to the pollution of waters. The CONAMA n. 398, of June of 2008, create a standardization of those procedures, so that there is an integration among the several emergency plans in a certain area. This article has for objective to accomplish a diagnosis in the several institutional programs of emergency to identify the current situation in the organized and terminal ports specialized in liquid barns, evaluating, when possible, it rationality of support logistic, the organization of operational administration and integration. (author)

  12. [Lightning strikes and lightning injuries in prehospital emergency medicine. Relevance, results, and practical implications].

    Science.gov (United States)

    Hinkelbein, J; Spelten, O; Wetsch, W A

    2013-01-01

    Up to 32.2% of patients in a burn center suffer from electrical injuries. Of these patients, 2-4% present with lightning injuries. In Germany, approximately 50 people per year are injured by a lightning strike and 3-7 fatally. Typically, people involved in outdoor activities are endangered and affected. A lightning strike usually produces significantly higher energy doses as compared to those in common electrical injuries. Therefore, injury patterns vary significantly. Especially in high voltage injuries and lightning injuries, internal injuries are of special importance. Mortality ranges between 10 and 30% after a lightning strike. Emergency medical treatment is similar to common electrical injuries. Patients with lightning injuries should be transported to a regional or supraregional trauma center. In 15% of all cases multiple people may be injured. Therefore, it is of outstanding importance to create emergency plans and evacuation plans in good time for mass gatherings endangered by possible lightning.

  13. Problems with Contingency Theory: Testing Assumptions Hidden within the Language of Contingency "Theory".

    Science.gov (United States)

    Schoonhoven, Clausia Bird

    1981-01-01

    Discusses problems in contingency theory, which relates organizational structure to the tasks performed and the information needed. Analysis of data from 17 hospitals suggests that traditional contingency theory underrepresents the complexity of relations among technological uncertainty, structure, and organizational effectiveness. (Author/RW)

  14. Optimal self-esteem is contingent: Intrinsic versus extrinsic and upward versus downward contingencies

    NARCIS (Netherlands)

    Vonk, R.; Smit, H.M.M.

    2012-01-01

    We argue that noncontingent, unconditional self-esteem is not optimal but defensive. We introduce the concept of intrinsic contingency, where self-esteem is affected by whether one's actions are self-congruent and conducive to personal growth. Whereas external contingencies, especially social and

  15. Agreement reached at Unilever after three-week strike over plant closures

    NARCIS (Netherlands)

    Grünell, M.

    2008-01-01

    In mid October 2007, staff at the Unilever plant in the Netherlands went on strike for over three weeks in protest against the group’s plan to close three of the country’s six Unilever plants. The trade unions believe that the closures are unnecessary and are calling for job guarantees for employees

  16. Acute transient hemiparesis induced by lightning strike.

    Science.gov (United States)

    Rahmani, Seyed Hesam; Faridaalaee, Gholamreza; Jahangard, Samira

    2015-07-01

    According to data from the National Oceanic and Atmospheric Administration,in the years from 1959 to 1994, lightning was responsible for more than 3000 deaths and nearly 10,000 casualties. The most important characteristic features of lightning injuries are multisystem involvement and widely variable severity. Lightning strikes are primarily a neurologic injury that affects all 3 components of the nervous system: central, autonomic,and peripheral. Neurologic complications of lightning strikes vary from transient benign symptoms to permanent disability. Many patients experience a temporary paralysis called keraunoparalysis. Here we reported a 22-year-old mountaineer man with complaining of left sided hemiparesis after being hit by a lightning strike in the mountain 3 hours ago. There was no loss of consciousness at hitting time. On arrival the patient was alert, awake and hemodynamically stable. In neurologic examination cranial nerves were intact, left sided upper and lower extremity muscle force was I/V with a combination of complete sensory loss, and right-sided muscle force and sensory examination were normal. There is not any evidence of significant vascular impairment in the affected extremities. Brain MRI and CT scan and cervical MRI were normal. During 2 days of admission, with intravenous hydration, heparin 5000 unit SC q12hr and physical therapy of the affected limbs, motor and sensory function improved and was normal except mild paresthesia. He was discharged 1 day later for outpatient follow up while vitamin B1 100mg orally was prescribed.Paresthesia improved after 3 days without further sequels.

  17. Foot-strike pattern and performance in a marathon.

    Science.gov (United States)

    Kasmer, Mark E; Liu, Xue-Cheng; Roberts, Kyle G; Valadao, Jason M

    2013-05-01

    To determine prevalence of heel strike in a midsize city marathon, if there is an association between foot-strike classification and race performance, and if there is an association between foot-strike classification and gender. Foot-strike classification (forefoot, midfoot, heel, or split strike), gender, and rank (position in race) were recorded at the 8.1-km mark for 2112 runners at the 2011 Milwaukee Lakefront Marathon. 1991 runners were classified by foot-strike pattern, revealing a heel-strike prevalence of 93.67% (n = 1865). A significant difference between foot-strike classification and performance was found using a Kruskal-Wallis test (P strike. No significant difference between foot-strike classification and gender was found using a Fisher exact test. In addition, subgroup analysis of the 126 non-heel strikers found no significant difference between shoe wear and performance using a Kruskal-Wallis test. The high prevalence of heel striking observed in this study reflects the foot-strike pattern of most mid-distance to long-distance runners and, more important, may predict their injury profile based on the biomechanics of a heel-strike running pattern. This knowledge can help clinicians appropriately diagnose, manage, and train modifications of injured runners.

  18. Searching for Plausible N-k Contingencies Endangering Voltage Stability

    DEFF Research Database (Denmark)

    Weckesser, Johannes Tilman Gabriel; Van Cutsem, Thierry

    2017-01-01

    This paper presents a novel search algorithm using time-domain simulations to identify plausible N − k contingencies endangering voltage stability. Starting from an initial list of disturbances, progressively more severe contingencies are investigated. After simulation of a N − k contingency......, the simulation results are assessed. If the system response is unstable, a plausible harmful contingency sequence has been found. Otherwise, components affected by the contingencies are considered as candidate next event leading to N − (k + 1) contingencies. This implicitly takes into account hidden failures...

  19. 2002 Bird Strike Committee USA/Canada Conference

    National Research Council Canada - National Science Library

    Dolbeer, Richard

    2002-01-01

    Over 380 people from 20 countries and 17 exhibitors attended the 4th annual joint meeting of Bird Strike Committee-USA and Bird Strike Committee Canada in Sacramento, California on October 21-24, 2002...

  20. BIRD/WILDLIFE STRIKE CONTROL FOR SAFER AIR ...

    African Journals Online (AJOL)

    Osondu

    2012-06-05

    Jun 5, 2012 ... Keywords: bird/wildlife, strike, aviation, hazard, control. Introduction ... Ethiopian Journal of Environmental Studies and Management EJESM Vol. 5 No. 3 2012 .... Aircraft Bird. Strike Avoidance Rader System (ABARS) and.

  1. Color and Contingency in Robert Boyle's Works.

    Science.gov (United States)

    Baker, Tawrin

    2015-01-01

    This essay investigates the relationship between color and contingency in Robert Boyle's Experiments and Considerations Touching Colours (1664) and his essays on the unsuccessfulness of experiments in Certain Physiological Essays (1661). In these two works Boyle wrestles with a difficult practical and philosophical problem with experiments, which he calls the problem of contingency. In Touching Colours, the problem of contingency is magnified by the much-debated issue of whether color had any deep epistemic importance. His limited theoretical principle guiding him in Touching Colours, that color is but modified light, further exacerbated the problem. Rather than theory, Boyle often relied on craftsmen, whose mastery of color phenomena was, Boyle mentions, brought about by economic forces, to determine when colors were indicators of important 'inward' properties of substances, and thus to secure a solid foundation for his experimental history of color.

  2. Equivalence relations and the reinforcement contingency.

    Science.gov (United States)

    Sidman, M

    2000-07-01

    Where do equivalence relations come from? One possible answer is that they arise directly from the reinforcement contingency. That is to say, a reinforcement contingency produces two types of outcome: (a) 2-, 3-, 4-, 5-, or n-term units of analysis that are known, respectively, as operant reinforcement, simple discrimination, conditional discrimination, second-order conditional discrimination, and so on; and (b) equivalence relations that consist of ordered pairs of all positive elements that participate in the contingency. This conception of the origin of equivalence relations leads to a number of new and verifiable ways of conceptualizing equivalence relations and, more generally, the stimulus control of operant behavior. The theory is also capable of experimental disproof.

  3. Strike-slip tectonics during rift linkage

    Science.gov (United States)

    Pagli, C.; Yun, S. H.; Ebinger, C.; Keir, D.; Wang, H.

    2017-12-01

    The kinematics of triple junction linkage and the initiation of transforms in magmatic rifts remain debated. Strain patterns from the Afar triple junction provide tests of current models of how rifts grow to link in area of incipient oceanic spreading. Here we present a combined analysis of seismicity, InSAR and GPS derived strain rate maps to reveal that the plate boundary deformation in Afar is accommodated primarily by extensional tectonics in the Red Sea and Gulf of Aden rifts, and does not require large rotations about vertical axes (bookshelf faulting). Additionally, models of stress changes and seismicity induced by recent dykes in one sector of the Afar triple junction provide poor fit to the observed strike-slip earthquakes. Instead we explain these patterns as rift-perpendicular shearing at the tips of spreading rifts where extensional strains terminate against less stretched lithosphere. Our results demonstrate that rift-perpendicular strike-slip faulting between rift segments achieves plate boundary linkage during incipient seafloor spreading.

  4. Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Adair, Kristin Lynn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Turgeon, Jennifer [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). High Confidence System Environments

    2016-04-01

    The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

  5. Properties of Lightning Strike Protection Coatings

    Science.gov (United States)

    Gagne, Martin

    Composite materials are being increasingly used by many industries. In the case of aerospace companies, those materials are installed on their aircraft to save weight, and thus, fuel costs. These aircraft are lighter, but the loss of electrical conductivity makes aircraft vulnerable to lightning strikes, which hit commercial aircrafts on average once per year. This makes lightning strike protection very important, and while current metallic expanded copper foils offer good protection, they increase the weight of composites. Therefore, under the CRIAQ COMP-502 project, a team of industrial partners and academic researchers are investigating new conductive coatings with the following characteristics: High electromagnetic protection, high mechanical resistance, good environmental protection, manufacturability and moderate cost. The main objectives of this thesis, as part of this project, was to determine the main characteristics, such as electrical and tribomechanical properties, of conductive coatings on composite panels. Their properties were also to be tested after destructive tests such as current injection and environmental testing. Bombardier Aerospace provided the substrate, a composite of carbon fiber reinforced epoxy matrix, and the current commercial product, a surfacing film that includes an expanded copper foil used to compare with the other coatings. The conductive coatings fabricated by the students are: silver nanoparticles inside a binding matrix (PEDOT:PSS or a mix of Epoxy and PEDOT:PSS), silvered carbon nanofibers embedded in the surfacing film, cold sprayed tin, graphene oxide functionalized with silver nanowires, and electroless plated silver. Additionally as part of the project and thesis, magnetron sputtered aluminum coated samples were fabricated. There are three main types of tests to characterize the conductive coatings: electrical, mechanical and environmental. Electrical tests consist of finding the sheet resistance and specific resistivity

  6. Contingency learning in human fear conditioning involves the ventral striatum.

    Science.gov (United States)

    Klucken, Tim; Tabbert, Katharina; Schweckendiek, Jan; Merz, Christian Josef; Kagerer, Sabine; Vaitl, Dieter; Stark, Rudolf

    2009-11-01

    The ability to detect and learn contingencies between fearful stimuli and their predictive cues is an important capacity to cope with the environment. Contingency awareness refers to the ability to verbalize the relationships between conditioned and unconditioned stimuli. Although there is a heated debate about the influence of contingency awareness on conditioned fear responses, neural correlates behind the formation process of contingency awareness have gained only little attention in human fear conditioning. Recent animal studies indicate that the ventral striatum (VS) could be involved in this process, but in human studies the VS is mostly associated with positive emotions. To examine this question, we reanalyzed four recently published classical fear conditioning studies (n = 117) with respect to the VS at three distinct levels of contingency awareness: subjects, who did not learn the contingencies (unaware), subjects, who learned the contingencies during the experiment (learned aware) and subjects, who were informed about the contingencies in advance (instructed aware). The results showed significantly increased activations in the left and right VS in learned aware compared to unaware subjects. Interestingly, this activation pattern was only found in learned but not in instructed aware subjects. We assume that the VS is not involved when contingency awareness does not develop during conditioning or when contingency awareness is unambiguously induced already prior to conditioning. VS involvement seems to be important for the transition from a contingency unaware to a contingency aware state. Implications for fear conditioning models as well as for the contingency awareness debate are discussed.

  7. A contingency table approach to nonparametric testing

    CERN Document Server

    Rayner, JCW

    2000-01-01

    Most texts on nonparametric techniques concentrate on location and linear-linear (correlation) tests, with less emphasis on dispersion effects and linear-quadratic tests. Tests for higher moment effects are virtually ignored. Using a fresh approach, A Contingency Table Approach to Nonparametric Testing unifies and extends the popular, standard tests by linking them to tests based on models for data that can be presented in contingency tables.This approach unifies popular nonparametric statistical inference and makes the traditional, most commonly performed nonparametric analyses much more comp

  8. Estimating state-contingent production functions

    DEFF Research Database (Denmark)

    Rasmussen, Svend; Karantininis, Kostas

    The paper reviews the empirical problem of estimating state-contingent production functions. The major problem is that states of nature may not be registered and/or that the number of observation per state is low. Monte Carlo simulation is used to generate an artificial, uncertain production...... environment based on Cobb Douglas production functions with state-contingent parameters. The pa-rameters are subsequently estimated based on different sizes of samples using Generalized Least Squares and Generalized Maximum Entropy and the results are compared. It is concluded that Maximum Entropy may...

  9. The contingent valuation method: a review

    International Nuclear Information System (INIS)

    Venkatachalam, L.

    2004-01-01

    The contingent valuation method (CVM) is a simple, flexible nonmarket valuation method that is widely used in cost-benefit analysis and environmental impact assessment. However, this method is subject to severe criticism. The criticism revolves mainly around two aspects, namely, the validity and the reliability of the results, and the effects of various biases and errors. The major objective of this paper is to review the recent developments on measures to address the validity and reliability issues arising out of different kinds of biases/errors and other related empirical and methodological issues concerning contingent valuation method

  10. Evaluating the Effects of a Bird Strike Advisory System

    NARCIS (Netherlands)

    Metz, I.C.; Mühlhausen, T; Ellerbroek, J.; Hoekstra, J.M.

    2016-01-01

    Bird strikes have operational impacts and cause economic loss to the aviation industry. In the worst case, the damages resulting from bird strikes lead to crashes. The highest risk for bird strikes lies in the area below 3000 ft and thus mainly in airport environments. Despite intense efforts from

  11. effects of strike cost on economic development in nigeria

    African Journals Online (AJOL)

    USER

    same firm, in other firms even in other industries (Kempner, 1980). For example ... The main purpose of this paper is to examine the strike cost and productivity in. Nigeria. ... Obnoxious Policies: Workers do go on strike when management makes obnoxious ... ASUU had to go on strike; the FGN had rescinded the decision.

  12. Effects of Contingency versus Constraints on the Body-Mass Scaling of Metabolic Rate

    Directory of Open Access Journals (Sweden)

    Douglas S. Glazier

    2018-01-01

    Full Text Available I illustrate the effects of both contingency and constraints on the body-mass scaling of metabolic rate by analyzing the significantly different influences of ambient temperature (Ta on metabolic scaling in ectothermic versus endothermic animals. Interspecific comparisons show that increasing Ta results in decreasing metabolic scaling slopes in ectotherms, but increasing slopes in endotherms, a pattern uniquely predicted by the metabolic-level boundaries hypothesis, as amended to include effects of the scaling of thermal conductance in endotherms outside their thermoneutral zone. No other published theoretical model explicitly predicts this striking variation in metabolic scaling, which I explain in terms of contingent effects of Ta and thermoregulatory strategy in the context of physical and geometric constraints related to the scaling of surface area, volume, and heat flow across surfaces. My analysis shows that theoretical models focused on an ideal 3/4-power law, as explained by a single universally applicable mechanism, are clearly inadequate for explaining the diversity and environmental sensitivity of metabolic scaling. An important challenge is to develop a theory of metabolic scaling that recognizes the contingent effects of multiple mechanisms that are modulated by several extrinsic and intrinsic factors within specified constraints.

  13. Effectiveness evaluation of contingency sum as a risk management ...

    African Journals Online (AJOL)

    Ethiopian Journal of Environmental Studies and Management ... manage risks prone projects have adopted several methods, one of which is contingency sum. ... initial project cost, cost overrun and percentage allowed for contingency.

  14. 48 CFR 1632.770 - Contingency reserve payments.

    Science.gov (United States)

    2010-10-01

    ... FINANCING Contract Funding 1632.770 Contingency reserve payments. (a) Payments from the contingency reserve... advise the carrier of its decision. However, OPM shall not unreasonably withhold approval for amounts...

  15. Forward to the Past: Strikes and Striking as Dialogue by other ...

    African Journals Online (AJOL)

    In Nigeria, from the colonial period to the present, the employment of strikes and protests by nationalists, Nigerian workers and civil society groups has been established as one of the potent means of conveying viewpoints, positions as well as the demand for equality, fairness, social justice and reforms. It has been used as ...

  16. A bird strike handbook for base-level managers

    Science.gov (United States)

    Payson, R. P.; Vance, J. D.

    1984-09-01

    To help develop more awareness about bird strikes and bird strike reduction techniques, this thesis compiled all relevant information through an extensive literature search, review of base-level documents, and personal interviews. The final product--A Bird Strike Handbook for Base-Level Managers--provides information on bird strike statistics, methods to reduce the strike hazards, and means to obtain additional assistance. The handbook is organized for use by six major base agencies: Maintenance, Civil Engineering, Operations, Air Field Management, Safety, and Air Traffic Control. An appendix follows at the end.

  17. Contingency Management with Human Autonomy Teaming

    Science.gov (United States)

    Shively, Robert J.; Lachter, Joel B.

    2018-01-01

    Automation is playing an increasingly important role in many operations. It is often cheaper faster and more precise than human operators. However, automation is not perfect. There are many situations in which a human operator must step in. We refer to these instances as contingencies and the act of stepping in contingency management. Here we propose coupling Human Autonomy Teaming (HAT) with contingency management. We describe two aspects to HAT, bi-directional communication, and working agreements (or plays). Bi-directional communication like Crew Resource Management in traditional aviation, allows all parties to contribute to a decision. Working agreements specify roles and responsibilities. Importantly working agreements allow for the possibility of roles and responsibilities changing depending on environmental factors (e.g., situations the automation was not designed for, workload, risk, or trust). This allows for the automation to "automatically" become more autonomous as it becomes more trusted and/or it is updated to deal with a more complete set of possible situations. We present a concrete example using a prototype contingency management station one might find in a future airline operations center. Automation proposes reroutes for aircraft that encounter bad weather or are forced to divert for environmental or systems reasons. If specific conditions are met, these recommendations may be autonomously datalinked to the affected aircraft.

  18. Two psychologies: Cognitive versus contingency-oriented

    NARCIS (Netherlands)

    Mey, H.R.A. De

    2003-01-01

    Cognitive psychology and contingency-based behavior analysis are contrasted to each other with respect to their philosophical and theoretical underpinnings as well as to theirpractical goals. Whereas the former focuses on intra-organismic structure and function in explaining minds, the latter

  19. The dependency and contingency of politics

    DEFF Research Database (Denmark)

    Triantafillou, Peter

    2016-01-01

    differences which make any analytical synthesis both a difficult and a questionable endeavour. In particular, whereas historical institutionalism seeks to explain the present in terms of its dependence on past events, genealogy seeks to provoke the present by demonstrating its historical contingency. In spite...

  20. Management issues regarding the contingent workforce

    Energy Technology Data Exchange (ETDEWEB)

    Bowen-Smed, S. [Bowen Workforce Solutions, Calgary, AB (Canada)

    2004-07-01

    Fifty per cent of corporate leaders in Calgary today will be eligible for retirement over the next 5 years. In addition, 53 per cent of the entire Calgary workforce is 45 years or older. This paper suggests that only companies that seek aggressive programs to engage immigrants and contractors will weather the skills shortages anticipated in the future. It was noted that contractors care about aligning values to organizations, regardless of the project length, and that professional development is a key consideration when it comes to selecting their next project. Contingent workforce issues include: effectiveness; classification; risk; and cost. It was stated that effectiveness of the contingent workforce is an employer's responsibility. Factors that would strengthen the relationship between corporations and contractors include: proper orientation to manage expectations; training to improve productivity; tracking to enhance the quality of the workforce; and a management process to ensure adherence to protocol. It was concluded that the contingent workforce is an essential component to human capital management strategy, but that key issues must be managed to avoid unnecessary costs. In addition, effectiveness improves when processes are implemented. It was also suggested that technology is an essential component of the solution. Outsourcing is an effective approach to managing the contingent workforce. tabs., figs.

  1. Responsibility modelling for civil emergency planning

    OpenAIRE

    Sommerville, Ian; Storer, Timothy; Lock, Russell

    2009-01-01

    This paper presents a new approach to analysing and understanding civil emergency planning based on the notion of responsibility modelling combined with HAZOPS-style analysis of information requirements. Our goal is to represent complex contingency plans so that they can be more readily understood, so that inconsistencies can be highlighted and vulnerabilities discovered. In this paper, we outline the framework for contingency planning in the United Kingdom and introduce the notion of respons...

  2. Contingency learning in alcohol dependence and pathological gambling: learning and unlearning reward contingencies

    NARCIS (Netherlands)

    Vanes, Lucy D.; van Holst, Ruth J.; Jansen, Jochem M.; van den Brink, Wim; Oosterlaan, Jaap; Goudriaan, Anna E.

    2014-01-01

    Patients with alcohol dependence (AD) and pathological gambling (PG) are characterized by dysfunctional reward processing and their ability to adapt to alterations of reward contingencies is impaired. However, most neurocognitive tasks investigating reward processing involve a complex mix of

  3. Contingency learning in alcohol dependence and pathological gambling: learning and unlearning reward contingencies

    NARCIS (Netherlands)

    Vanes, L.D.; Holst, R.J. van; Jansen, J.M.; Brink, W. van den; Oosterlaan, J.; Goudriaan, A.E.

    2014-01-01

    BACKGROUND: Patients with alcohol dependence (AD) and pathological gambling (PG) are characterized by dysfunctional reward processing and their ability to adapt to alterations of reward contingencies is impaired. However, most neurocognitive tasks investigating reward processing involve a complex

  4. Contingency Learning in Alcohol Dependence and Pathological Gambling: Learning and Unlearning Reward Contingencies

    NARCIS (Netherlands)

    Vanes, L.D.; Holst, R.; Jansen, J.D.; van den Brink, W.A.; Oosterlaan, J.; Goudriaan, A.E.

    2014-01-01

    Background: Patients with alcohol dependence (AD) and pathological gambling (PG) are characterized by dysfunctional reward processing and their ability to adapt to alterations of reward contingencies is impaired. However, most neurocognitive tasks investigating reward processing involve a complex

  5. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  6. Strikes and solidarity: coalfield conflict in Britain, 1889-1966

    Energy Technology Data Exchange (ETDEWEB)

    Roy Church; Quentin Outram [University of East Anglia, Norwich (United Kingdom)

    2002-05-01

    This book investigates the history of strike activity in the British coal mining industry, a byword for industrial militancy since the late nineteenth century. Contents: 1. Interpreting coalfield conflict: focus and formulations; 2. Tradition and modernity: the mining industry 1889-1940; 3. Employers and workers: organizations and strategies; 4. Employers and workers: ideologies, attitudes and political orientations; 5. Configurations of strike activity; 6. Strike participation and solidarity before 1912; 7. Strikes, organization and consciousness in 1912 and after; 8. Conflictual context? The 'isolated mass' revisited; 9. Mining and modernity: size, sectionalism and solidarity; 10. The foundations of strike propensity; 11. Miners and management: agency and action; 12. Industrial relations and strikes after nationalization; 13. International perspectives; 14. Myths and realities: strikes, solidarity and 'militant miners'.

  7. 40 CFR 51.1012 - Requirement for contingency measures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Requirement for contingency measures... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1012 Requirement for contingency measures... contingency measures to be undertaken if the area fails to make reasonable further progress, or fails to...

  8. 78 FR 46781 - Federal Acquisition Regulation; Definition of Contingency Operation

    Science.gov (United States)

    2013-08-01

    ... Federal Acquisition Regulation; Definition of Contingency Operation AGENCY: Department of Defense (DoD... the Federal Acquisition Regulation (FAR) to revise the definition of ``contingency operation'' to... ``contingency operation'' at FAR 2.101 in accordance with the statutory change to the definition made by...

  9. 30 CFR 218.152 - Fishermen's Contingency Fund.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Fishermen's Contingency Fund. 218.152 Section 218.152 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR MINERALS REVENUE..., Offshore § 218.152 Fishermen's Contingency Fund. Upon the establishment of the Fishermen's Contingency Fund...

  10. 78 FR 13765 - Federal Acquisition Regulation; Definition of Contingency Operation

    Science.gov (United States)

    2013-02-28

    ... Federal Acquisition Regulation; Definition of Contingency Operation AGENCY: Department of Defense (DoD... Regulation (FAR) to revise the definition of ``contingency operation'' to address the statutory change to the... ``contingency operation'' at FAR 2.101 in accordance with the statutory change to the definition made by...

  11. 50 CFR 296.3 - Fishermen's contingency fund.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Fishermen's contingency fund. 296.3... ADMINISTRATION, DEPARTMENT OF COMMERCE CONTINENTAL SHELF FISHERMEN'S CONTINGENCY FUND § 296.3 Fishermen's contingency fund. (a) General. There is established in the Treasury of the United States the Fishermen's...

  12. Psychophysics of associative learning: Quantitative properties of subjective contingency.

    Science.gov (United States)

    Maia, Susana; Lefèvre, Françoise; Jozefowiez, Jérémie

    2018-01-01

    Allan and collaborators (Allan, Hannah, Crump, & Siegel, 2008; Allan, Siegel, & Tangen, 2005; Siegel, Allan, Hannah, & Crump, 2009) recently proposed to apply signal detection theory to the analysis of contingency judgment tasks. When exposed to a flow of stimuli, participants are asked to judge whether there is a contingent relation between a cue and an outcome, that is, whether the subjective cue-outcome contingency exceeds a decision threshold. In this context, we tested the following hypotheses regarding the relation between objective and subjective cue-outcome contingency: (a) The underlying distributions of subjective cue-outcome contingency are Gaussian; (b) The mean distribution of subjective contingency is a linear function of objective cue-outcome contingency; and (c) The variance in the distribution of subjective contingency is constant. The hypotheses were tested by combining a streamed-trial contingency assessment task with a confidence rating procedure. Participants were exposed to rapid flows of stimuli at the end of which they had to judge whether an outcome was more (Experiment 1) or less (Experiment 2) likely to appear following a cue and how sure they were of their judgment. We found that although Hypothesis A seems reasonable, Hypotheses B and C were not. Regarding Hypothesis B, participants were more sensitive to positive than to negative contingencies. Regarding Hypothesis C, the perceived cue-outcome contingency became more variable when the contingency became more positive or negative, but only to a slight extent. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  13. 48 CFR 225.7303-4 - Contingent fees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contingent fees. 225.7303....7303-4 Contingent fees. (a) Except as provided in paragraph (b) of this subsection, contingent fees are generally allowable under DoD contracts, provided— (1) The fees are paid to a bona fide employee or a bona...

  14. Sartre's Contingency of Being and Asouzu's Principle of Causality ...

    African Journals Online (AJOL)

    The position of this work is that all contingent beings have a causal agent. This position is taken as a result of trying to delve into the issue of contingency and causality of being which has been discussed by many philosophers of diverse epochs of philosophy. This work tries to participate in the debate of whether contingent ...

  15. Contingent capture effects in temporal order judgments.

    Science.gov (United States)

    Born, Sabine; Kerzel, Dirk; Pratt, Jay

    2015-08-01

    The contingent attentional capture hypothesis proposes that visual stimuli that do not possess characteristics relevant for the current task will not capture attention, irrespective of their bottom-up saliency. Typically, contingent capture is tested in a spatial cuing paradigm, comparing manual reaction times (RTs) across different conditions. However, attention may act through several mechanisms and RTs may not be ideal to disentangle those different components. In 3 experiments, we examined whether color singleton cues provoke cuing effects in temporal order judgments (TOJs) and whether they would be contingent on attentional control sets. Experiment 1 showed that color singleton cues indeed produce cuing effects in TOJs, even in a cluttered and dynamic target display containing multiple heterogeneous distractors. In Experiment 2, consistent with contingent capture, we observed reliable cuing effects only when the singleton cue matched participants' current attentional control set. Experiment 3 suggests that a sensory interaction account of the differences found in Experiment 2 is unlikely. Our results help to discern the attentional components that may play a role in contingent capture. Further, we discuss a number of other effects (e.g., reversed cuing effects) that are found in RTs, but so far have not been reported in TOJs. Those differences suggest that RTs are influenced by a multitude of mechanisms; however, not all of these mechanisms may affect TOJs. We conclude by highlighting how the study of attentional capture in TOJs provides valuable insights for the attention literature, but also for studies concerned with the perceived timing between stimuli. (c) 2015 APA, all rights reserved).

  16. Standard format and content of a licensee physical protection plan for strategic special nuclear material in transit - April 1980

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    A predetermined plan to respond to safeguards contingency events is required to be prepared, based on personnel and other physical protection resources described in the Physical Protection Plan for strategic special nuclear material (SSNM) in transit. Specific requirements for the contingency plan are provided in Appendix C. Licensee Safeguards Contingency Plans, to 10 CFR Part 73. Regulatory Guide 5.56, Standard Format and Content of Safeguards Contingency Plans for Transportation, provides guidance for the preparation of transportation contingency plans. Licensee is reminded that all three submissions - the Physical Protection Plan, the Physical Protection Arrangements for Specific Shipments, and the Safeguards Contingency Plan - together describe the system for physical protection of each particular shipment. They should be developed and maintained to be completely consistent with each other for each shipment

  17. Preventive strike vs. false targets and protection in defense strategy

    International Nuclear Information System (INIS)

    Levitin, Gregory; Hausken, Kjell

    2011-01-01

    A defender allocates its resource between defending an object passively and striking preventively against an attacker seeking to destroy the object. With no preventive strike the defender distributes its entire resource between deploying false targets, which the attacker cannot distinguish from the genuine object, and protecting the object. If the defender strikes preventively, the attacker's vulnerability depends on its protection and on the defender's resource allocated to the strike. If the attacker survives, the object's vulnerability depends on the attacker's revenge attack resource allocated to the attacked object. The optimal defense resource distribution between striking preventively, deploying the false targets and protecting the object is analyzed. Two cases of the attacker strategy are considered: when the attacker attacks all of the targets and when it chooses a number of targets to attack. An optimization model is presented for making a decision about the efficiency of the preventive strike based on the estimated attack probability, dependent on a variety of model parameters.

  18. 76 FR 17801 - Approval and Promulgation of Implementation Plans; New York Reasonable Further Progress Plans...

    Science.gov (United States)

    2011-03-31

    ..., Contingency Measures and Motor Vehicle Emissions Budgets AGENCY: Environmental Protection Agency (EPA). ACTION... plan, and the contingency measures as they relate to the New York portion of the New York- Northern New... individual listed in the FOR FURTHER INFORMATION CONTACT section to view the hard copy of the docket. You may...

  19. Children on hunger strike: child abuse or legitimate protest?

    OpenAIRE

    Mok, A.; Nelson, E. A.; Murphy, J.; Hampson, A.; Hendriks, J. H.

    1996-01-01

    The issue of children on hunger strike (voluntary total fasting) has not been reported before. The World Medical Association Declaration of Tokyo 1975 and the Declaration of Malta 1991 (revised 1992) provide clinicians with guidelines for the management of adult patients on hunger strike but do not mention children. We report the management of 14 Vietnamese children, aged 1 to 12 years, who took part in a hunger strike at a refugee detention centre in Hong Kong.

  20. The effect of hand dominance on martial arts strikes.

    Science.gov (United States)

    Neto, Osmar Pinto; Silva, Jansen Henrique; Marzullo, Ana Carolina de Miranda; Bolander, Richard P; Bir, Cynthia A

    2012-08-01

    The main goal of this study was to compare dominant and non-dominant martial arts palm strikes under different circumstances that usually happen during martial arts and combative sports applications. Seven highly experienced (10±5 years) right hand dominant Kung Fu practitioners performed strikes with both hands, stances with left or right lead legs, and with the possibility or not of stepping towards the target (moving stance). Peak force was greater for the dominant hand strikes (1593.76±703.45 N vs. 1042.28±374.16 N; p<.001), whereas no difference was found in accuracy between the hands (p=.141). Additionally, peak force was greater for the strikes with moving stance (1448.75±686.01 N vs. 1201.80±547.98 N; p=.002) and left lead leg stance (1378.06±705.48 N vs. 1269.96±547.08 N). Furthermore, the difference in peak force between strikes with moving and stationary stances was statistically significant only for the strikes performed with a left lead leg stance (p=.007). Hand speed was higher for the dominant hand strikes (5.82±1.08 m/s vs. 5.24±0.78 m/s; p=.001) and for the strikes with moving stance (5.79±1.01 m/s vs. 5.29±0.90 m/s; p<.001). The difference in hand speed between right and left hand strikes was only significant for strikes with moving stance. In summary, our results suggest that the stronger palm strike for a right-handed practitioner is a right hand strike on a left lead leg stance moving towards the target. Copyright © 2011 Elsevier B.V. All rights reserved.

  1. [Contingency management in opioid substitution treatment].

    Science.gov (United States)

    Specka, M; Böning, A; Scherbaum, N

    2011-07-01

    The majority of opiate-dependent patients in substitution treatment show additional substance-related disorders. Concomitant use of heroin, alcohol, benzodiazepines or cocaine compromises treatment success. Concomitant drug use may be treated by using contingency management (CM) which is based on learning theory. In CM, abstinence from drugs, as verified by drug screenings, is reinforced directly and contingently. Reinforcers used in CM studies with substituted patients were, amongst others, vouchers and take-home privileges. Studies in the USA show a medium average effect of CM on drug consumption rates and abstinence. The effects decrease markedly after the end of the intervention. We discuss whether CM is applicable within the German substitution treatment system and how it can be combined with other interventions such as selective detoxification treatments or cognitive-behavioural programmes. © Georg Thieme Verlag KG Stuttgart · New York.

  2. Contingency and similarity in response selection.

    Science.gov (United States)

    Prinz, Wolfgang

    2018-05-09

    This paper explores issues of task representation in choice reaction time tasks. How is it possible, and what does it take, to represent such a task in a way that enables a performer to do the task in line with the prescriptions entailed in the instructions? First, a framework for task representation is outlined which combines the implementation of task sets and their use for performance with different kinds of representational operations (pertaining to feature compounds for event codes and code assemblies for task sets, respectively). Then, in a second step, the framework is itself embedded in the bigger picture of the classical debate on the roles of contingency and similarity for the formation of associations. The final conclusion is that both principles are needed and that the operation of similarity at the level of task sets requires and presupposes the operation of contingency at the level of event codes. Copyright © 2018 The Author. Published by Elsevier Inc. All rights reserved.

  3. Pasca Gempa Kerinci Tahun 1995 dan Rencana Kontigensi (Contingency Planning)

    OpenAIRE

    Naryanto, Heru Sri; Santoso, Eko Widi

    1997-01-01

    Gempa Kerinci tahun 1995 menimbulkan banyak korban baik jiwa maupun harta. Gempa ini juga telah melumpuhkan gerak nadi perekonomian di Kabupaten Dati Il Kerinci. Pembangunan kembali (recovery) telah dilakukan bersama-sama balk oleh pemerintah daerah, pemerintah pusat dari semua instansi terkait maupun swadaya masyarakat setempat. Berdasarkan asumsi bahwa daerah yang pernah terjadi gempa, dimungkinkan terjadi lagi gempa ditempat tersebut. Sehingga Pasca Gempa Kerinci tahun 1995 perlu ditindakl...

  4. 40 CFR 264.52 - Content of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... to air, soil, or surface water at the facility. (b) If the owner or operator has already prepared a... control equipment, communications and alarm systems (internal and external), and decontamination equipment...

  5. 40 CFR 265.52 - Content of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... hazardous waste constituents to air, soil, or surface water at the facility. (b) If the owner or operator... alarm systems (internal and external), and decontamination equipment), where this equipment is required...

  6. 78 FR 64879 - Liquidity and Contingency Funding Plans

    Science.gov (United States)

    2013-10-30

    ... FICUs to have multiple sources of liquidity. Twenty-five commenters objected to the CLF's structure... sources, of funding, such as a corporate credit union or correspondent bank. C. How does the final rule... sources. However, while government sponsored, FHLBs are not federal facilities and are not obligated to...

  7. Contingency plans for chromium utilization. Publication NMAB-335

    International Nuclear Information System (INIS)

    1978-01-01

    The United States depends entirely on foreign sources for the critical material, chromium, making it very vulnerable to supply disruptions. This vulnerability results because chromium is essential for the fabrication of corrosion-resisting steels and high-temperature, oxidation-resisting alloys in applications that are vital to the nation's technological well-being; because no substitutes are known for these materials in those applications; and because the known, substantial deposits of chromite ore are only in a few geographical locations that could become inaccessible to the United States as a result of political actions. The effectiveness of programs such as stockpiling, conservation, and research and development for substitutes to reduce the impact of disruption of imports of chromite and ferrochromium are discussed. Alternatives for decreasing chromium consumption also are identified for chromium-containing materials in the areas of design, processing, and substitution

  8. Food Marketing Technology and Contingency Market Valuation

    OpenAIRE

    Garth J. Holloway; Anthony C. Zwart

    1993-01-01

    Marketing activities are introduced into a rational expectations model of the food marketing system. The model is used to evaluate effects of alternative marketing technologies on the distribution of the benefits of contingency markets in agriculture. Benefits depend on two parameters: the cost share of farm inputs and the elasticity of substitution between farm and nonfarm inputs in food marketing. Over a broad spectrum of technologies, consumers are likely to be the net beneficiaries and fa...

  9. Capacity Adjustment through Contingent Staffing Outsourcing

    OpenAIRE

    Neubert , Gilles; Adjadj , Philippe

    2009-01-01

    International audience; For a long time, contingent staffing was considered as the responsability of the Human Resource department. The high needs of workforce flexibility combined with disseminated agencies have led some companies to a great number of labor suppliers. This situation has produced important cost variation, poor quality of service, and important risk due to the mistunderstanding by local managers of legal considerations. To face this situation, companies have started to move fr...

  10. Foot strike patterns after obstacle clearance during running.

    Science.gov (United States)

    Scholten, Shane D; Stergiou, Nicholas; Hreljac, Alan; Houser, Jeremy; Blanke, Daniel; Alberts, L Russell

    2002-01-01

    Running over obstacles of sufficient height requires heel strike (HS) runners to make a transition in landing strategy to a forefoot (FF) strike, resulting in similar ground reaction force patterns to those observed while landing from a jump. Identification of the biomechanical variables that distinguish between the landing strategies may offer some insight into the reasons that the transition occurs. The purpose of this study was to investigate the difference in foot strike patterns and kinetic parameters of heel strike runners between level running and running over obstacles of various heights. Ten heel strike subjects ran at their self-selected pace under seven different conditions: unperturbed running (no obstacle) and over obstacles of six different heights (10%, 12.5%, 15%, 17.5%, 20%, and 22.5% of their standing height). The obstacle was placed directly before a Kistler force platform. Repeated measures ANOVAs were performed on the subject means of selected kinetic parameters. The statistical analysis revealed significant differences (P strike patterns were affected by the increased obstacle height. Between the 12.5% and 15% obstacle conditions, the group response changed from a heel strike to a forefoot strike pattern. At height > 15%, the pattern was more closely related to the foot strike patterns found in jumping activities. This strategy change may represent a gait transition effected as a mechanism to protect against increased impact forces. Greater involvement of the ankle and the calf muscles could have assisted in attenuating the increased impact forces while maintaining speed after clearing the obstacle.

  11. Debunking the viper's strike: harmless snakes kill a common assumption.

    Science.gov (United States)

    Penning, David A; Sawvel, Baxter; Moon, Brad R

    2016-03-01

    To survive, organisms must avoid predation and acquire nutrients and energy. Sensory systems must correctly differentiate between potential predators and prey, and elicit behaviours that adjust distances accordingly. For snakes, strikes can serve both purposes. Vipers are thought to have the fastest strikes among snakes. However, strike performance has been measured in very few species, especially non-vipers. We measured defensive strike performance in harmless Texas ratsnakes and two species of vipers, western cottonmouths and western diamond-backed rattlesnakes, using high-speed video recordings. We show that ratsnake strike performance matches or exceeds that of vipers. In contrast with the literature over the past century, vipers do not represent the pinnacle of strike performance in snakes. Both harmless and venomous snakes can strike with very high accelerations that have two key consequences: the accelerations exceed values that can cause loss of consciousness in other animals, such as the accelerations experienced by jet pilots during extreme manoeuvres, and they make the strikes faster than the sensory and motor responses of mammalian prey and predators. Both harmless and venomous snakes can strike faster than the blink of an eye and often reach a target before it can move. © 2016 The Author(s).

  12. Contingency Cost estimation for Research reactor Decommissioning

    International Nuclear Information System (INIS)

    Jin, Hyung Gon; Hong, Yun Jeong

    2016-01-01

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors

  13. Contingency Cost estimation for Research reactor Decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Hyung Gon; Hong, Yun Jeong [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors.

  14. Sound-contingent visual motion aftereffect

    Directory of Open Access Journals (Sweden)

    Kobayashi Maori

    2011-05-01

    Full Text Available Abstract Background After a prolonged exposure to a paired presentation of different types of signals (e.g., color and motion, one of the signals (color becomes a driver for the other signal (motion. This phenomenon, which is known as contingent motion aftereffect, indicates that the brain can establish new neural representations even in the adult's brain. However, contingent motion aftereffect has been reported only in visual or auditory domain. Here, we demonstrate that a visual motion aftereffect can be contingent on a specific sound. Results Dynamic random dots moving in an alternating right or left direction were presented to the participants. Each direction of motion was accompanied by an auditory tone of a unique and specific frequency. After a 3-minutes exposure, the tones began to exert marked influence on the visual motion perception, and the percentage of dots required to trigger motion perception systematically changed depending on the tones. Furthermore, this effect lasted for at least 2 days. Conclusions These results indicate that a new neural representation can be rapidly established between auditory and visual modalities.

  15. Contingency Valuation of Croatian Arboretum Opeka

    Directory of Open Access Journals (Sweden)

    Stjepan Posavec

    2012-12-01

    Full Text Available Background and Purpose: Social aspects of forestry have always been an important factor of forest usage and management, and therefore have significant influence on its sustainability. Non-wood forest functions such as recreation, tourism, aesthetic and educational factors influence development of rural areas. Contingent valuation method has rarely been used for evaluation of protected forest areas. The aim of the article is to estimate the amount of money visitors are willing to pay for nature’s resources preservation in the arboretum Opeka in the North-West Croatia. Material and Methods: Opeka Arboretum is situated in the Vinica municipality in northern Croatia. Located in a large park surrounding a manor, Opeka arboretum, with its 65 hectares is the largest of the three arboretums existing in Croatia today. The arboretum was founded in 1860 by the Count Marko Bombelles. Contingent valuation is a survey-based economic technique for the non-market valuation of resources, such as environmental preservation or the impact of contamination. It is also the approach that can generally be used to include what is usually referred to as the passive use component of the economic value of environmental goods. Results and Conclusion: Willingness to pay for visitor’s use of the arboretum has been investigated using the survey and contingency valuation method on a sample of 53 respondents. Research results present high preference for arboretum benefits such as beauty of landscape, cultural and historical significance, recreation and health but low willingness to pay.

  16. A decade of U.S. Air Force bat strikes

    Science.gov (United States)

    Peurach, Suzanne C.; Dove, Carla J.; Stepko, Laura

    2009-01-01

    From 1997 through 2007, 821 bat strikes were reported to the U.S. Air Force (USAF) Safety Center by aircraft personnel or ground crew and sent to the National Museum of Natural History, Smithsonian Institution, for identification. Many samples were identified by macroscopic and or microscopic comparisons with bat specimens housed in the museum and augmented during the last 2 years by DNA analysis. Bat remains from USAF strikes during this period were received at the museum from 40 states in the United States and from 20 countries. We confirmed that 46% of the strikes were caused by bats, but we did not identify them further; we identified 5% only to the family or genus level, and 49% to the species level. Fifty-five of the 101 bat-strike samples submitted for DNA analysis have been identified to the species level. Twenty-five bat species have been recorded striking USAF planes worldwide. The Brazilian free-tailed bat (Tadarida brasiliensis; n = 173) is the species most commonly identified in USAF strike impacts, followed by the red bat (Lasiurus borealis; n = 83). Bat strikes peak during the spring and fall, with >57% occurring from August through October; 82% of the reports that included time of strike were recorded between 2100 and 0900 hours. More than 12% of the bat strikes were reported at >300 m above ground level (AGL). Although $825,000 and >50% of this sum was attributable to 5 bat-strike incidents. Only 5 bats from the 10 most damaging bat strikes were identified to the species level, either because we did not receive remains with the reports or the sample was insufficient for identification.

  17. Province of Ontario nuclear emergency plan. Pt. 1

    International Nuclear Information System (INIS)

    1986-06-01

    The Province of Ontario Nuclear Emergency Plan has been developed pursuant to Section 8 of the Emergency Plans Act, 1983. This plan replaces the Province of Ontario Nuclear Contingency Off-Site Plan (June 1980) which is no longer applicable. The wastes plan includes planning, preparation, emergency organization and operational responsibilities and policy

  18. Decision support tools for urban contingency policy: a scenario approach to risk management of the Vesuvio area in Naples, Italy

    NARCIS (Netherlands)

    Concilio, Grazia; Torrieri, Francesca

    2001-01-01

    Contingency management, in particular the management of unanticipated events outside the control of an ordinary planning system, has in the last 50years become an important andfrequently debated issue in the scientific literature on complex systems management underrisk conditions. The urban system

  19. Force of habit: shrubs, trees and contingent evolution of wood anatomical diversity using Croton (Euphorbiaceae) as a model system

    Science.gov (United States)

    Rafael Arévalo; Benjamin W. van Ee; Ricarda Riina; Paul E. Berry; Alex C. Wiedenhoeft

    2017-01-01

    Background and Aims Wood is a major innovation of land plants, and is usually a central component of the body plan for two major plant habits: shrubs and trees. Wood anatomical syndromes vary between shrubs and trees, but no prior work has explicitly evaluated the contingent evolution of wood anatomical diversity in the context...

  20. Environmental Assessment for Conventional Strike Missile Demonstration

    Science.gov (United States)

    2010-08-01

    impact Preferred Alternative flight path, Kwajalein, Likiep, Ailuk, Taka , and Utirik Atolls, as well as Jemo Islet, might be affected (see Figure 2-5...For the BOA impact Alternative flight path, Bikar, Taka , and Utirik Atolls might be affected. Census records from 1999 indicate 527 residents on...Likiep Atoll, 513 on Ailuk Atoll, 433 on Utirik Atoll; and none on Bikar and Taka Atolls or on Jemo Islet (RMI Economic Policy, Planning, and Statistics

  1. Martial arts striking hand peak acceleration, accuracy and consistency.

    Science.gov (United States)

    Neto, Osmar Pinto; Marzullo, Ana Carolina De Miranda; Bolander, Richard P; Bir, Cynthia A

    2013-01-01

    The goal of this paper was to investigate the possible trade-off between peak hand acceleration and accuracy and consistency of hand strikes performed by martial artists of different training experiences. Ten male martial artists with training experience ranging from one to nine years volunteered to participate in the experiment. Each participant performed 12 maximum effort goal-directed strikes. Hand acceleration during the strikes was obtained using a tri-axial accelerometer block. A pressure sensor matrix was used to determine the accuracy and consistency of the strikes. Accuracy was estimated by the radial distance between the centroid of each subject's 12 strikes and the target, whereas consistency was estimated by the square root of the 12 strikes mean squared distance from their centroid. We found that training experience was significantly correlated to hand peak acceleration prior to impact (r(2)=0.456, p =0.032) and accuracy (r(2)=0. 621, p=0.012). These correlations suggest that more experienced participants exhibited higher hand peak accelerations and at the same time were more accurate. Training experience, however, was not correlated to consistency (r(2)=0.085, p=0.413). Overall, our results suggest that martial arts training may lead practitioners to achieve higher striking hand accelerations with better accuracy and no change in striking consistency.

  2. Orthotic intervention in forefoot and rearfoot strike running patterns.

    Science.gov (United States)

    Stackhouse, Carrie Laughton; Davis, Irene McClay; Hamill, Joseph

    2004-01-01

    To compare the differential effect of custom orthoses on the lower extremity mechanics of a forefoot and rearfoot strike pattern. Fifteen subjects ran with both a forefoot and a rearfoot strike pattern with and without orthoses. Lower extremity kinematic and kinetic variables were compared between strike pattern and orthotic conditions. Foot orthoses have been shown to be effective in controlling excessive rearfoot motion in rearfoot strikers. The effect of orthotic intervention on rearfoot motion in forefoot strikers has not been previously reported. Five trials were collected for each condition. Peak rearfoot eversion, eversion excursion, eversion velocity, peak inversion moment, and inversion work were compared between conditions. Kinematic variables in the sagittal plane of the rearfoot and in the frontal and sagittal plane of the knee were also determined. Increased rearfoot excursions and velocities and decreased peak eversion were noted in the forefoot strike pattern compared to the rearfoot strike pattern. Orthotic intervention, however,did not significantly change rearfoot motion in either strike pattern. Reductions in internal rotation and abduction of the knee were noted with orthotic intervention. Foot orthoses do not differentially effect rearfoot motion of a rearfoot strike and a forefoot strike running pattern. Orthotic intervention has a larger and more systematic effect on rearfoot kinetics compared to rearfoot kinematics.

  3. Teaching Striking Skills in Elementary Physical Education Using Woodball

    Science.gov (United States)

    Chang, Seung Ho; Lee, Jihyun

    2017-01-01

    Object control (OC) skills are a part of fundamental motor skills and basic functional skills, which work as a prerequisite to becoming a skilled performer in many sports. Of various OC skills, striking is one of the most difficult to master due to a variety of interrelated movement components. A form of vertical or underarm striking is a more…

  4. NASA Contingency Shuttle Crew Support (CSCS) Medical Operations

    Science.gov (United States)

    Adams, Adrien

    2010-01-01

    The genesis of the space shuttle began in the 1930's when Eugene Sanger came up with the idea of a recyclable rocket plane that could carry a crew of people. The very first Shuttle to enter space was the Shuttle "Columbia" which launched on April 12 of 1981. Not only was "Columbia" the first Shuttle to be launched, but was also the first to utilize solid fuel rockets for U.S. manned flight. The primary objectives given to "Columbia" were to check out the overall Shuttle system, accomplish a safe ascent into orbit, and to return back to earth for a safe landing. Subsequent to its first flight Columbia flew 27 more missions but on February 1st, 2003 after a highly successful 16 day mission, the Columbia, STS-107 mission, ended in tragedy. With all Shuttle flight successes come failures such as the fatal in-flight accident of STS 107. As a result of the STS 107 accident, and other close-calls, the NASA Space Shuttle Program developed contingency procedures for a rescue mission by another Shuttle if an on-orbit repair was not possible. A rescue mission would be considered for a situation where a Shuttle and the crew were not in immediate danger, but, was unable to return to Earth or land safely. For Shuttle missions to the International Space Station (ISS), plans were developed so the Shuttle crew would remain on board ISS for an extended period of time until rescued by a "rescue" Shuttle. The damaged Shuttle would subsequently be de-orbited unmanned. During the period when the ISS Crew and Shuttle crew are on board simultaneously multiple issues would need to be worked including, but not limited to: crew diet, exercise, psychological support, workload, and ground contingency support

  5. Strike kinematics and performance in juvenile ball pythons (Python regius).

    Science.gov (United States)

    Ryerson, William G; Tan, Weimin

    2017-08-01

    The rapid strike of snakes has interested researchers for decades. Although most work has focused on the strike performance of vipers, recent work has shown that other snakes outside of the Viperidae can strike with the same velocities and accelerations. However, to date all of these examples focus on performance in adult snakes. Here, we use high-speed video to measure the strike kinematics and performance of 10 juvenile (pythons, Python regius. We find that juvenile P. regius strike at levels comparable to larger snakes, but with shorter durations and over shorter distances. We conclude that the juvenile P. regius maintain performance likely through manipulation of the axial musculature and accompanying elastic tissues, and that this is a first step to understanding ontogenetic changes in behavior and a potential avenue for understanding how captivity may also impact behavior. © 2017 Wiley Periodicals, Inc.

  6. Strike Point Control on EAST Using an Isoflux Control Method

    International Nuclear Information System (INIS)

    Xing Zhe; Xiao Bingjia; Luo Zhengping; Walker, M. L.; Humphreys, D. A.

    2015-01-01

    For the advanced tokamak, the particle deposition and thermal load on the divertor is a big challenge. By moving the strike points on divertor target plates, the position of particle deposition and thermal load can be shifted. We could adjust the Poloidal Field (PF) coil current to achieve the strike point position feedback control. Using isoflux control method, the strike point position can be controlled by controlling the X point position. On the basis of experimental data, we establish relational expressions between X point position and strike point position. Benchmark experiments are carried out to validate the correctness and robustness of the control methods. The strike point position is successfully controlled following our command in the EAST operation. (paper)

  7. Expertise of using striking techniques for power stroke in badminton.

    Science.gov (United States)

    Zhu, Qin

    2013-10-01

    Two striking techniques (fast swing and angled striking) were examined to see if they allowed effective use of string tension for the power stroke in badminton. 12 participants (4 novices, 4 recreational, and 4 expert badminton players) were recorded by a fast-speed camera while striking a shuttlecock with racquets of 8 different string tensions. The peak speed of the shuttlecock, the racquet angle and the shuttlecock angle were analyzed. The results showed that expert players succeeded in using both striking techniques to overcome the constraint of string tension and produce a consistently superior stroke. Failure to use either striking technique resulted in inferior performance that was constrained by string tension. Expertise in badminton allows the necessary motor adjustments based on the affordance perception of the string tension.

  8. Wavelet transform analysis of electromyography kung fu strikes data.

    Science.gov (United States)

    Neto, Osmar Pinto; Marzullo, Ana Carolina de Miranda

    2009-11-01

    In martial arts and contact sports strikes are performed at near maximum speeds. For that reason, electromyography (EMG) analysis of such movements is non-trivial. This paper has three main goals: firstly, to investigate the differences in the EMG activity of muscles during strikes performed with and without impacts; secondly, to assess the advantages of using Sum of Significant Power (SSP) values instead of root mean square (rms) values when analyzing EMG data; and lastly to introduce a new method of calculating median frequency values using wavelet transforms (WMDF). EMG data of the deltoid anterior (DA), triceps brachii (TB) and brachioradialis (BR) muscles were collected from eight Kung Fu practitioners during strikes performed with and without impacts. SSP results indicated significant higher muscle activity (p = 0.023) for the strikes with impact. WMDF results, on the other hand, indicated significant lower values (p = 0. 007) for the strikes with impact. SSP results presented higher sensitivity than rms to quantify important signal differences and, at the same time, presented lower inter-subject coefficient of variations. The result of increase in SSP values and decrease in WMDF may suggest better synchronization of motor units for the strikes with impact performed by the experienced Kung Fu practitioners. Key PointsThe results show higher muscle activity and lower electromyography median frequencies for strikes with impact compared to strikes without.SSP results presented higher sensitivity and lower inter-subject coefficient of variations than rms results.Kung Fu palm strikes with impact may present better motor units' synchronization than strikes without.

  9. Skype me! Socially Contingent Interactions Help Toddlers Learn Language

    OpenAIRE

    Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta Michnick

    2013-01-01

    Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This paper focuses on whether social contingency might support word learning. Toddlers aged 24- to 30-months (N=36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and non-contingent video training (yoked video). Results sugges...

  10. The Teacher Strike: School District Protection Procedures. A Manual for School District Officials on How to Handle a Teachers' Strike.

    Science.gov (United States)

    Igoe, Joseph A.; DiRocco, Anthony P.

    This booklet is designed to give practical and realistic advice to school district officials faced with the possibility of a teachers' strike. It is intended for use both by school district administrators and school board members. The booklet is organized into four sections that focus in turn on signs of a pending teachers' strike, union…

  11. The Impact of the Contingency of Robot Feedback for HRI

    DEFF Research Database (Denmark)

    Fischer, Kerstin; Lohan, Katrin Solveig; Saunders, Joe

    2013-01-01

    robot iCub on a set of shapes and on a stacking task in two conditions, once with socially contingent, nonverbal feedback implemented in response to different gaze and looming behaviors of the human tutor, and once with non-contingent, saliency-based feedback. The results of the analysis of participants......’ linguistic behaviors in the two conditions show that contingency has an impact on the complexity and the pre-structuring of the task for the robot, i.e. on the participants’ tutoring behaviors. Contingency thus plays a considerable role for learning by demonstration....

  12. Motor contingency learning and infants with Spina Bifida.

    Science.gov (United States)

    Taylor, Heather B; Barnes, Marcia A; Landry, Susan H; Swank, Paul; Fletcher, Jack M; Huang, Furong

    2013-02-01

    Infants with Spina Bifida (SB) were compared to typically developing infants (TD) using a conjugate reinforcement paradigm at 6 months-of-age (n = 98) to evaluate learning, and retention of a sensory-motor contingency. Analyses evaluated infant arm-waving rates at baseline (wrist not tethered to mobile), during acquisition of the sensory-motor contingency (wrist tethered), and immediately after the acquisition phase and then after a delay (wrist not tethered), controlling for arm reaching ability, gestational age, and socioeconomic status. Although both groups responded to the contingency with increased arm-waving from baseline to acquisition, 15% to 29% fewer infants with SB than TD were found to learn the contingency depending on the criterion used to determine contingency learning. In addition, infants with SB who had learned the contingency had more difficulty retaining the contingency over time when sensory feedback was absent. The findings suggest that infants with SB do not learn motor contingencies as easily or at the same rate as TD infants, and are more likely to decrease motor responses when sensory feedback is absent. Results are discussed with reference to research on contingency learning in infants with and without neurodevelopmental disorders, and with reference to motor learning in school-age children with SB.

  13. Resiliency Evaluation, Assessment and Contingency Tools, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Resiliency Evaluation, Assessment and Contingency Tools (REACT) Achieving resiliency in any system requires capabilities that are beyond the boundaries of currently...

  14. The Need for a Strategic Approach to Contingency Contracting

    National Research Council Canada - National Science Library

    D'Angelo, Anthony F; Houglan, Danny H; Ruckwardt, Edwin

    2007-01-01

    ...; however, the contingency arena is often overlooked. Corporations are finding a strategic enterprise orientation to procurement can create or enhance their own competitive position within a market...

  15. Practical application of double-contingency protection

    International Nuclear Information System (INIS)

    Kent, N.A.; Sanders, C.F.

    1995-01-01

    The Westinghouse Commercial Fuel Fabrication Facility in Columbia, South Carolina, manufactures fuel assemblies and core components for the commercial nuclear power industry. The ammonium diurinate conversion process converts low-enriched ( 235 U) uranium hexafluoride (UF 6 ) or uranyl nitrate into ceramic-grade uranium dioxide (UO 2 ) powder. The UO 2 powder is then tumble blended in 1700-kg containers to ensure powder homogeneity and obtain necessary enrichments. The double-contingency principle is applied to all systems, processes, and components in which special nuclear material is processed, handled, or stored to ensure that an acceptable nuclear criticality margin of safety is maintained. The Nuclear Criticality Safety (NCS) Program at the Columbia plant is divided into three primary functions: analysis and evaluation, implementation, and compliance. The primary task in analysis and evaluation is to develop comprehensive criticality safety evaluations for all proposed new installations and system modifications. These evaluations involve identifying which of the nine physical process parameters directly affect neutron multiplication and establishing bounding assumptions and criticality safety limits (CSLs). The implementation function primarily consists of translating the open-quotes NCS-speakclose quotes (parameters, k eff , contingencies, barriers, controls, etc.) into operator language (procedural requirements, valve positions, flow rates, pressures, temperatures, etc.) and communicating this information clearly to the manufacturing function through procedures and training. The compliance function deals primarily with conducting criticality safety inspections, audits, and process upset investigations. This paper presents two examples of the challenges associated with the practical implementation of the double-contingency principle to the chemical manufacturing process at the Columbia plant

  16. Rethinking Reinforcement: Allocation, Induction, and Contingency

    Science.gov (United States)

    Baum, William M

    2012-01-01

    The concept of reinforcement is at least incomplete and almost certainly incorrect. An alternative way of organizing our understanding of behavior may be built around three concepts: allocation, induction, and correlation. Allocation is the measure of behavior and captures the centrality of choice: All behavior entails choice and consists of choice. Allocation changes as a result of induction and correlation. The term induction covers phenomena such as adjunctive, interim, and terminal behavior—behavior induced in a situation by occurrence of food or another Phylogenetically Important Event (PIE) in that situation. Induction resembles stimulus control in that no one-to-one relation exists between induced behavior and the inducing event. If one allowed that some stimulus control were the result of phylogeny, then induction and stimulus control would be identical, and a PIE would resemble a discriminative stimulus. Much evidence supports the idea that a PIE induces all PIE-related activities. Research also supports the idea that stimuli correlated with PIEs become PIE-related conditional inducers. Contingencies create correlations between “operant” activity (e.g., lever pressing) and PIEs (e.g., food). Once an activity has become PIE-related, the PIE induces it along with other PIE-related activities. Contingencies also constrain possible performances. These constraints specify feedback functions, which explain phenomena such as the higher response rates on ratio schedules in comparison with interval schedules. Allocations that include a lot of operant activity are “selected” only in the sense that they generate more frequent occurrence of the PIE within the constraints of the situation; contingency and induction do the “selecting.” PMID:22287807

  17. Upgrader alley : oil sands fever strikes Edmonton

    International Nuclear Information System (INIS)

    Griffiths, M.; Dyer, S.

    2008-01-01

    Large-scale industrial complexes called upgraders are similar to oil refineries. Several upgraders are planned for the area just northeast of Edmonton, known as Upgrader Alley. Concerns have been expressed over the potential congestion and environmental impacts of these upgraders. Upgraders will also attract other industry, and the cumulative effects of development will have major impacts on the region, its people and the natural environment. The report provided an overview of Upgrader Alley, with reference to what is driving development; upgrading issues; what Upgrader Alley will look like; and how much water Upgrader Alley needs. The report also discussed impacts on the land, air quality, and greenhouse gases. Water demand issues were discussed with reference to impacts on the North Saskatchewan River, water levels, water quality, a water management framework, and groundwater resources. Cumulative impacts were also presented. It was concluded that if all the projects for which applications had been submitted were approved, the rapid pace of growth in Upgrader Alley would mimic that of Fort McMurray. If the rate of development were somewhat slower, there would be more time to develop and implement plans to reduce the impacts. 189 refs., 6 tabs., 14 figs

  18. Sustainability between Necessity, Contingency and Impossibility

    Directory of Open Access Journals (Sweden)

    Karl Bruckmeier

    2009-12-01

    Full Text Available Sustainable use of natural resources seems necessary to maintain functions and services of eco- and social systems in the long run. Efforts in policy and science for sustainable development have shown the splintering of local, national and global strategies. Sustainability becomes contingent and insecure with the actors´ conflicting knowledge, interests and aims, and seems even impossible through the “rebound”-effect. To make short and long term requirements of sustainability coherent requires critical, comparative and theoretical analysis of the problems met. For this purpose important concepts and theories are discussed in this review of recent interdisciplinary literature about resource management.

  19. Resource Contingency Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

  20. Dissociating Contingency Awareness and Conditioned Attitudes: Evidence of Contingency-Unaware Evaluative Conditioning

    Science.gov (United States)

    Hutter, Mandy; Sweldens, Steven; Stahl, Christoph; Unkelbach, Christian; Klauer, Karl Christoph

    2012-01-01

    Whether human evaluative conditioning can occur without contingency awareness has been the subject of an intense and ongoing debate for decades, troubled by a wide array of methodological difficulties. Following recent methodological innovations, the available evidence currently points to the conclusion that evaluative conditioning effects do not…

  1. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  2. The Necessity of Contingency or Contingent Necessity: Meillassoux, Hegel, and the Subject

    Directory of Open Access Journals (Sweden)

    John Van Houdt

    2011-06-01

    Full Text Available This article addresses the relationship of contingency to necessity as developed by Quentin Meillassoux and G.W.F. Hegel. Meillassoux criticizes the restriction of possibility by modern philosophy to the conditions of the transcendental subject, which he calls ‘correlationism’, and opposes to this correlationism, mathematics as an absolute form of thought. The arch-figure of a metaphysical version of correlationism for Meillassoux is Hegel. This article argues that, while Meillassoux is right to criticize a version of correlationism for restricting the range of contingency, he overlooks Hegel’s unique contribution to this issue. Hegel provides us a version of necessity modeled on the mathematical proof which answers Meillassoux’s concerns about correlationist versions of necessity but does not altogether jettison the concept of the subject. Instead, the subject in Hegel is a contingent interruption which emerges from the breaks in the kinds of necessity we posit about the world. Hegel offers us a way of tying these two concepts together in what I call ‘contingent necessity’.

  3. Contingency in the Cosmos and the Contingency of the Cosmos : Two Theological Approaches

    NARCIS (Netherlands)

    Drees, W.B.

    Contingency in reality may be epistemic, due to incomplete knowledge or the intersection of unrelated causal trajectories. In quantum physics, it appears to be ontological. More fundamental and interesting is the limit-question ‘why is there something rather than nothing,’ pointing out the

  4. Conditional Epistemic Planning

    DEFF Research Database (Denmark)

    Andersen, Mikkel Birkegaard; Bolander, Thomas; Jensen, Martin Holm

    2012-01-01

    Recent work has shown that Dynamic Epistemic Logic (DEL) offers a solid foundation for automated planning under partial observability and non-determinism. Under such circumstances, a plan must branch if it is to guarantee achieving the goal under all contingencies (strong planning). Without...... branching, plans can offer only the possibility of achieving the goal (weak planning). We show how to formulate planning in uncertain domains using DEL and give a language of conditional plans. Translating this language to standard DEL gives verification of both strong and weak plans via model checking....... In addition to plan verification, we provide a tableau-inspired algorithm for synthesising plans, and show this algorithm to be terminating, sound and complete....

  5. Determine the Foot Strike Pattern Using Inertial Sensors

    Directory of Open Access Journals (Sweden)

    Tzyy-Yuang Shiang

    2016-01-01

    Full Text Available From biomechanical point of view, strike pattern plays an important role in preventing potential injury risk in running. Traditionally, strike pattern determination was conducted by using 3D motion analysis system with cameras. However, the procedure is costly and not convenient. With the rapid development of technology, sensors have been applied in sport science field lately. Therefore, this study was designed to determine the algorithm that can identify landing strategies with a wearable sensor. Six healthy male participants were recruited to perform heel and forefoot strike strategies at 7, 10, and 13 km/h speeds. The kinematic data were collected by Vicon 3D motion analysis system and 2 inertial measurement units (IMU attached on the dorsal side of both shoes. The data of each foot strike were gathered for pitch angle and strike index analysis. Comparing the strike index from IMU with the pitch angle from Vicon system, our results showed that both signals exhibited highly correlated changes between different strike patterns in the sagittal plane (r=0.98. Based on the findings, the IMU sensors showed potential capabilities and could be extended beyond the context of sport science to other fields, including clinical applications.

  6. 2006 Precision Strike Annual Programs Review

    Science.gov (United States)

    2006-04-19

    NON­LETHAL WEAPONS?  • GEOPOLITICAL SITUATION  •MATURITY OF  TECHNOLGY   • NEW EFFECTS BASED CAPABILITY  • PRECISION STRIKE AVAILABILITY  • PEACE... TECHNOLGY  OF 1900??? SEVEN DEADLY SINS OF NON­LETHAL WEAPONS  ­  NLWs make it easier to initiate war  •­  NLWs will start a new arms race  •­  NLWs may be...Third Party Targeting  capability  •  Range  •  Commonality in  planning processes  •  Affordable  •  Network enabled  •  Informs  BDA process

  7. Learning, awareness, and instruction: subjective contingency awareness does matter in the colour-word contingency learning paradigm.

    Science.gov (United States)

    Schmidt, James R; De Houwer, Jan

    2012-12-01

    In three experiments, each of a set colour-unrelated distracting words was presented most often in a particular target print colour (e.g., "month" most often in red). In Experiment 1, half of the participants were told the word-colour contingencies in advance (instructed) and half were not (control). The instructed group showed a larger learning effect. This instruction effect was fully explained by increases in subjective awareness with instruction. In Experiment 2, contingency instructions were again given, but no contingencies were actually present. Although many participants claimed to be aware of these (non-existent) contingencies, they did not produce an instructed contingency effect. In Experiment 3, half of the participants were given contingency instructions that did not correspond to the correct contingencies. Participants with these false instructions learned the actual contingencies worse than controls. Collectively, our results suggest that conscious contingency knowledge might play a moderating role in the strength of implicit learning. Copyright © 2012 Elsevier Inc. All rights reserved.

  8. Significant others and contingencies of self-worth: activation and consequences of relationship-specific contingencies of self-worth.

    Science.gov (United States)

    Horberg, E J; Chen, Serena

    2010-01-01

    Three studies tested the activation and consequences of contingencies of self-worth associated with specific significant others, that is, relationship-specific contingencies of self-worth. The results showed that activating the mental representation of a significant other with whom one strongly desires closeness led participants to stake their self-esteem in domains in which the significant other wanted them to excel. This was shown in terms of self-reported contingencies of self-worth (Study 1), in terms of self-worth after receiving feedback on a successful or unsatisfactory performance in a relationship-specific contingency domain (Study 2), and in terms of feelings of reduced self-worth after thinking about a failure in a relationship-specific contingency domain (Study 3). Across studies, a variety of contingency domains were examined. Furthermore, Study 3 showed that failing in an activated relationship-specific contingency domain had negative implications for current feelings of closeness and acceptance in the significant-other relationship. Overall, the findings suggest that people's contingencies of self-worth depend on the social situation and that performance in relationship-specific contingency domains can influence people's perceptions of their relationships.

  9. "Thunderstruck": penetrating thoracic injury from lightning strike.

    Science.gov (United States)

    van Waes, Oscar J F; van de Woestijne, Pieter C; Halm, Jens A

    2014-04-01

    Lightning strike victims are rarely presented at an emergency department. Burns are often the primary focus. This case report describes the improvised explosive device like-injury to the thorax due to lightning strike and its treatment, which has not been described prior in (kerauno)medicine. Penetrating injury due to blast from lightning strike is extremely rare. These "shrapnel" injuries should however be ruled out in all patients struck by lightning. Copyright © 2013 American College of Emergency Physicians. Published by Mosby, Inc. All rights reserved.

  10. Strike action by nurses in South Africa: A value clarification

    Directory of Open Access Journals (Sweden)

    Marie Muller

    2001-09-01

    Full Text Available The Labour Relations Act (South Africa, 1991 made provision for protected strike action by employees, subject to certain conditions, procedures and negotiated agreements. This led to the removal of the strike clause in the Nursing Act (South Africa, 1992. The labour rights of all citizens are entrenched in the Constitution of the country (South Africa, 1996. Participation in strike action by the nurse/ midwife, regardless of the legal requirements and specifications, does, however, pose an ethical question. It is therefore necessary to conduct a value clarification on strike action by nurses in South Africa. The purpose of this research is to explore and describe the perceived values of participants from an accessible population on this phenomenon. A qualitative, exploratory and descriptive research design was deployed. The perceived values of nurses on strike action were collected by means of an openended questionnaire/sketch. Over a period of three years a purposive and convenient sampling method was used, involving all the enrolled post basic nursing/midwifery students/ learners at a particular Nursing Education Institution. The justification of the sample was further enhanced by also collecting data on the participants’ age and provincial distribution location. Although a 63% sample realisation (of the accessible population was achieved, this represents only 1,5% of the registered nursing/midwifery population in the country. A descriptive analysis of the participants’ age and provincial distribution was undertaken, as well as a content analysis of their perceived values on strike action. The mean age of the participants was 48 years, which could be attributed to the fact that most of them were enrolled for a post-basic Diploma in Community Nursing Science. Most of the responses (52,7% were against strike action and 32,5% supported strike action by nurses as a constitutional and legal right. A fairly substantial number of participants (14

  11. Physicians' strikes and the competing bases of physicians' moral obligations.

    Science.gov (United States)

    MacDougall, D Robert

    2013-09-01

    Many authors have addressed the morality of physicians' strikes on the assumption that medical practice is morally different from other kinds of occupations. This article analyzes three prominent theoretical accounts that attempt to ground such special moral obligations for physicians--practice-based accounts, utilitarian accounts, and social contract accounts--and assesses their applicability to the problem of the morality of strikes. After critiquing these views, it offers a fourth view grounding special moral obligations in voluntary commitments, and explains why this is a preferable basis for understanding physicians' moral obligations in general and especially as pertaining to strikes.

  12. Women's Choices in Europe: Striking the Work-life Balance

    OpenAIRE

    Hantrais , Linda; Ackers , Peter

    2005-01-01

    Abstract The article presents evidence from interviews in France, Spain and Poland to explore how individual actors make choices about their work-life balance. It shows that choice is a complex, contingent, and relative concept, which is both facilitated and obstructed by public policies and working regulations. Despite differences in national and sub-national policy contexts, ...

  13. 76 FR 36857 - Federal Employees Health Benefits Program: New Premium Rating Method for Most Community Rated Plans

    Science.gov (United States)

    2011-06-23

    ... contingency reserve accounts or factored into reduced premiums for enrollees in the following plan year. Under...-TCR community rated plans' contingency reserves. Issuers failing to meet the FEHB-specific MLR... definition of medical loss ratio by HHS in December 2010, upon which this rule relies. Further, plans have...

  14. INVESTIGATION OF CONTINGENCY PATTERNS OF TEACHERS’ SCAFFOLDING IN TEACHING AND LEARNING MATHEMATICS

    Directory of Open Access Journals (Sweden)

    Anwar Anwar

    2016-12-01

    Full Text Available The purpose of this study is to investigate the patterns of scaffolding contingency in teaching and learning mathematics carried out by three teachers. Contingency patterns are obtained by examining the transcription from video recording of conversation fragments between teachers and students during the provision of scaffolding. The contingency patterns are drawn in three strategies: diagnostic strategy, intervention strategy, and checking diagnosis. The result shows that the three teachers expressed different interaction contingencies in their scaffolding activities: contingent dominant, non-contingent dominant, and pseudo-contingent. It is also found that the learning interaction performed by experienced teachers tends to be contingent dominant compared to novice teachers. Keywords: Contingency, Contingent Dominant, Non-Contingent Dominant, Pseudo Contingent, Scaffolding DOI: http://dx.doi.org/10.22342/jme.8.1.3410.65-76

  15. Ethical and legal consideration of prisoner's hunger strike in Serbia.

    Science.gov (United States)

    Alempijevic, Djordje; Pavlekic, Snezana; Jecmenica, Dragan; Nedeljkov, Aleksandra; Jankovic, Milos

    2011-03-01

    Hunger strike of prisoners and detainees remains a major human rights and ethical issue for medical professionals. We are reporting on a case of a 48-year-old male sentenced prisoner, intravenous heroin user, who went on a hunger strike and died 15 days later. Throughout the fasting period, the prisoner, who was capable of decision making, refused any medical examination. Autopsy findings were not supporting prolonged starvation, while toxicology revealed benzodiazepines and opiates in blood and urine. Cause of death was given as "heroin intoxication" in keeping with detection of 6-MAM. Legal and ethical issues pertinent to medical examination and treatment of prisoners on hunger strike are explored in accordance with legislation and professional ethical standards in Serbia. A recommendation for the best autopsy practice in deaths following hunger strike has been made. © 2011 American Academy of Forensic Sciences.

  16. Continental United States Hurricane Strikes 1950-2012

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Continental U.S. Hurricane Strikes Poster is our most popular poster which is updated annually. The poster includes all hurricanes that affected the U.S. since...

  17. BIRD/WILDLIFE STRIKE CONTROL FOR SAFER AIR ...

    African Journals Online (AJOL)

    Osondu

    2012-06-05

    Jun 5, 2012 ... Several factors including lack of adequate data, shortage of funds, inadequate training of staff and lack of ... Keywords: bird/wildlife, strike, aviation, hazard, control. Introduction ..... implications of some human activities within.

  18. 2005 Significant U.S. Hurricane Strikes Poster

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The 2005 Significant U.S. Hurricane Strikes poster is one of two special edition posters for the Atlantic Hurricanes. This beautiful poster contains two sets of...

  19. Application of the double-contingency principle within BNFL

    International Nuclear Information System (INIS)

    Strafford, P.I.D.

    1995-01-01

    Historically, the double-contingency principle has been used for criticality assessment within British Nuclear Fuels plc (BNFL). This paper outlines what is understood by the double-contingency principle to illustrate how it is applied in criticality safety assessments and to highlight various problem areas that are encountered and, where possible, how they might be solved

  20. The Role of Feedback Contingency in Perceptual Category Learning

    Science.gov (United States)

    Ashby, F. Gregory; Vucovich, Lauren E.

    2016-01-01

    Feedback is highly contingent on behavior if it eventually becomes easy to predict, and weakly contingent on behavior if it remains difficult or impossible to predict even after learning is complete. Many studies have demonstrated that humans and nonhuman animals are highly sensitive to feedback contingency, but no known studies have examined how feedback contingency affects category learning, and current theories assign little or no importance to this variable. Two experiments examined the effects of contingency degradation on rule-based and information-integration category learning. In rule-based tasks, optimal accuracy is possible with a simple explicit rule, whereas optimal accuracy in information-integration tasks requires integrating information from two or more incommensurable perceptual dimensions. In both experiments, participants each learned rule-based or information-integration categories under either high or low levels of feedback contingency. The exact same stimuli were used in all four conditions and optimal accuracy was identical in every condition. Learning was good in both high-contingency conditions, but most participants showed little or no evidence of learning in either low-contingency condition. Possible causes of these effects are discussed, as well as their theoretical implications. PMID:27149393

  1. Baseline Response Levels Are a Nuisance in Infant Contingency Learning

    Science.gov (United States)

    Millar, W. S.; Weir, Catherine

    2015-01-01

    The impact of differences in level of baseline responding on contingency learning in the first year was examined by considering the response acquisition of infants classified into baseline response quartiles. Whereas the three lower baseline groups showed the predicted increment in responding to a contingency, the highest baseline responders did…

  2. CW-FIT: Group Contingency Effects across the Day

    Science.gov (United States)

    Wills, Howard P.; Iwaszuk, Wendy M.; Kamps, Debra; Shumate, Emily

    2014-01-01

    This study explored the effects of a group-contingency intervention on student behavior across academic instructional periods. Research suggests group contingencies are evidence-based practices, yet calls for investigation to determine the best conditions and groups suited for this type of intervention. CW-FIT (Class-Wide Function-related…

  3. Roentgenologic characteristic of 7 group contingent of dispensary registration

    International Nuclear Information System (INIS)

    Derzhavin, V.I.; Nalivajko, N.N.; Kozlova, L.N.; Petrik, R.N.

    1984-01-01

    9694 persons of 7 group contingent of dispensary registration were examined. Roentgenologic study of posttuberculous changes of 7 group contingent of dispensary registration showed that in people of 7-A subgroup prevail processes of secondary genesis (79.4%) and in people of 7-B subgroup - of primary genesis (55.8%). Consequences of secondary tuberculosis are most recurring

  4. Relative speed of processing determines color-word contingency learning.

    Science.gov (United States)

    Forrin, Noah D; MacLeod, Colin M

    2017-10-01

    In three experiments, we tested a relative-speed-of-processing account of color-word contingency learning, a phenomenon in which color identification responses to high-contingency stimuli (words that appear most often in particular colors) are faster than those to low-contingency stimuli. Experiment 1 showed equally large contingency-learning effects whether responding was to the colors or to the words, likely due to slow responding to both dimensions because of the unfamiliar mapping required by the key press responses. For Experiment 2, participants switched to vocal responding, in which reading words is considerably faster than naming colors, and we obtained a contingency-learning effect only for color naming, the slower dimension. In Experiment 3, previewing the color information resulted in a reduced contingency-learning effect for color naming, but it enhanced the contingency-learning effect for word reading. These results are all consistent with contingency learning influencing performance only when the nominally irrelevant feature is faster to process than the relevant feature, and therefore are entirely in accord with a relative-speed-of-processing explanation.

  5. The double-contingency principle: An historical perspective

    International Nuclear Information System (INIS)

    Knief, R.A.

    1995-01-01

    Standard ANSI/ANS-8.1 states the double contingency principle as: Process designs should, in general, incorporate sufficient factors of safety to require at least two unlikely, independent, and concurrent changes in process conditions before a criticality accident is possible. This paper presents a perspective on the double contingency principle

  6. Appraisal of the Performance of Contingency Cost Provision for ...

    African Journals Online (AJOL)

    The paper appraised performance of contingency allowance in addressing projects' cost risk. To achieve this aim, impact of contingency provision in some selected building projects were evaluated. Data for the study was collected by means of checklist from 40 completed projects' files. Furthermore, 100 questionnaires on ...

  7. Analisa Kemampuan Saluran Berdasarkan Metode Contingency N-1 Analysis

    OpenAIRE

    Syukriyadin,; Susanti, Rahmi

    2010-01-01

    Sistem transmisi memegang peranan yang sangatpenting dalam proses penyaluran daya. Oleh karena itupengamanan pada saluran transmisi perlu mendapatperhatian yang serius dalam perencanaannya. Analisakemampuan saluran merupakan aplikasi untuk mempelajarikestabilan sistem. Analisa kemampuan saluran dalampenelitian ini menggunakan metode contingency N-1 analysis.Contingency N-1 analysis merupakan sebuah program untukmemperhitungkan berbagi kondisi yang mungkin terjadidalam sistem dimasa yang akan ...

  8. The Role of Relational Information in Contingent Capture

    Science.gov (United States)

    Becker, Stefanie I.; Folk, Charles L.; Remington, Roger W.

    2010-01-01

    On the contingent capture account, top-down attentional control settings restrict involuntary attentional capture to items that match the features of the search target. Attention capture is involuntary, but contingent on goals and intentions. The observation that only target-similar items can capture attention has usually been taken to show that…

  9. Comparison of force, power, and striking efficiency for a Kung Fu strike performed by novice and experienced practitioners: preliminary analysis.

    Science.gov (United States)

    Neto, Osmar Pinto; Magini, Marcio; Saba, Marcelo M F; Pacheco, Marcos Tadeu Tavares

    2008-02-01

    This paper presents a comparison of force, power, and efficiency values calculated from Kung Fu Yau-Man palm strikes, when performed by 7 experienced and 6 novice men. They performed 5 palm strikes to a freestanding basketball, recorded by high-speed camera at 1000 Hz. Nonparametric comparisons and correlations showed experienced practitioners presented larger values of mean muscle force, mean impact force, mean muscle power, mean impact power, and mean striking efficiency, as is noted in evidence obtained for other martial arts. Also, an interesting result was that for experienced Kung Fu practitioners, muscle power was linearly correlated with impact power (p = .98) but not for the novice practitioners (p = .46).

  10. EM Health and Safety Plan Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This document contains information about the Health and Safety Plan Guidelines. Topics discussed include: Regulatory framework; key personnel; hazard assessment; training requirements; personal protective equipment; extreme temperature disorders or conditions; medical surveillance; exposure monitoring/air sampling; site control; decontamination; emergency response/contingency plan; emergency action plan; confined space entry; and spill containment.

  11. SWS2 visual pigment evolution as a test of historically contingent patterns of plumage color evolution in warblers.

    Science.gov (United States)

    Bloch, Natasha I; Morrow, James M; Chang, Belinda S W; Price, Trevor D

    2015-02-01

    Distantly related clades that occupy similar environments may differ due to the lasting imprint of their ancestors-historical contingency. The New World warblers (Parulidae) and Old World warblers (Phylloscopidae) are ecologically similar clades that differ strikingly in plumage coloration. We studied genetic and functional evolution of the short-wavelength-sensitive visual pigments (SWS2 and SWS1) to ask if altered color perception could contribute to the plumage color differences between clades. We show SWS2 is short-wavelength shifted in birds that occupy open environments, such as finches, compared to those in closed environments, including warblers. Phylogenetic reconstructions indicate New World warblers were derived from a finch-like form that colonized from the Old World 15-20 Ma. During this process, the SWS2 gene accumulated six substitutions in branches leading to New World warblers, inviting the hypothesis that passage through a finch-like ancestor resulted in SWS2 evolution. In fact, we show spectral tuning remained similar across warblers as well as the finch ancestor. Results reject the hypothesis of historical contingency based on opsin spectral tuning, but point to evolution of other aspects of visual pigment function. Using the approach outlined here, historical contingency becomes a generally testable theory in systems where genotype and phenotype can be connected. © 2014 The Author(s). Evolution © 2014 The Society for the Study of Evolution.

  12. MONOSODIUM TITANATE MULTI-STRIKE TESTING

    International Nuclear Information System (INIS)

    BARNES, MARKJ

    2004-01-01

    Research over the past decade has studied the adsorption of plutonium and uranium onto monosodium titanate (MST) in alkaline solutions. Tests showed that MST would remove the targeted radionuclides from simulated alkaline waste. Testing also indicated that Pu removal kinetics and Np capacity of the MST material impacts the size of equipment and waste blending plans for the Salt Waste Processing Facility (SWPF). Additionally, calculations suggested the baseline MST process may not achieve the desired decontamination in wastes containing elevated concentrations of Pu and Np. In this task, the authors investigated the performance of non-baseline process parameters and their effectiveness for treating waste feed in the Salt Waste Processing Facility. The work addresses a DOE request in support of technical needs expressed, in part, by the Engineering, Procurement, and Construction Contractors for the Salt Waste Processing Facility. The work investigated the effect of increased MST addition (up to 1.2 g/L) and the benefit of extra filtration steps with multiple additions of MST to salt waste containing actinides and strontium. Both simulant and actual waste testing occurred. Actual waste tests used a Tank 39H composite waste solution. In addition, testing to determine desorption of actinides from residual MST occurred. The release of sorbed Sr and actinides from loaded MST during the washing stages in the Salt Waste Processing Facility is an unresolved process behavior. Desorption tests assessed this potential problem using loaded MST from the residue of the MST adsorption tests. Analysis of non-radioactive Sr in the tests proved difficult due to the low concentration of nonradioactive Sr and its nearness to the method detection limit for ICP-MS. Efforts to use AMP to minimize dilution of actual waste for removal from the cell did not help for this analysis since instrument dilution still proved necessary due to the salt content

  13. Effects of footwear and strike type on running economy.

    Science.gov (United States)

    Perl, Daniel P; Daoud, Adam I; Lieberman, Daniel E

    2012-07-01

    This study tests if running economy differs in minimal shoes versus standard running shoes with cushioned elevated heels and arch supports and in forefoot versus rearfoot strike gaits. We measured the cost of transport (mL O(2)·kg(-1)·m(-1)) in subjects who habitually run in minimal shoes or barefoot while they were running at 3.0 m·s(-1) on a treadmill during forefoot and rearfoot striking while wearing minimal and standard shoes, controlling for shoe mass and stride frequency. Force and kinematic data were collected when subjects were shod and barefoot to quantify differences in knee flexion, arch strain, plantar flexor force production, and Achilles tendon-triceps surae strain. After controlling for stride frequency and shoe mass, runners were 2.41% more economical in the minimal-shoe condition when forefoot striking and 3.32% more economical in the minimal-shoe condition when rearfoot striking (P forefoot and rearfoot striking did not differ significantly in cost for either minimal- or standard-shoe running. Arch strain was not measured in the shod condition but was significantly greater during forefoot than rearfoot striking when barefoot. Plantar flexor force output was significantly higher in forefoot than in rearfoot striking and in barefoot than in shod running. Achilles tendon-triceps surae strain and knee flexion were also lower in barefoot than in standard-shoe running. Minimally shod runners are modestly but significantly more economical than traditionally shod runners regardless of strike type, after controlling for shoe mass and stride frequency. The likely cause of this difference is more elastic energy storage and release in the lower extremity during minimal-shoe running.

  14. Skype me! Socially Contingent Interactions Help Toddlers Learn Language

    Science.gov (United States)

    Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta Michnick

    2013-01-01

    Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This paper focuses on whether social contingency might support word learning. Toddlers aged 24- to 30-months (N=36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and non-contingent video training (yoked video). Results suggest that children only learned novel verbs in socially contingent interactions (live interactions and video chat). The current study highlights the importance of social contingency in interactions for language learning and informs the literature on learning through screen media as the first study to examine word learning through video chat technology. PMID:24112079

  15. QV modal distance displacement - a criterion for contingency ranking

    Energy Technology Data Exchange (ETDEWEB)

    Rios, M.A.; Sanchez, J.L.; Zapata, C.J. [Universidad de Los Andes (Colombia). Dept. of Electrical Engineering], Emails: mrios@uniandes.edu.co, josesan@uniandes.edu.co, cjzapata@utp.edu.co

    2009-07-01

    This paper proposes a new methodology using concepts of fast decoupled load flow, modal analysis and ranking of contingencies, where the impact of each contingency is measured hourly taking into account the influence of each contingency over the mathematical model of the system, i.e. the Jacobian Matrix. This method computes the displacement of the reduced Jacobian Matrix eigenvalues used in voltage stability analysis, as a criterion of contingency ranking, considering the fact that the lowest eigenvalue in the normal operation condition is not the same lowest eigenvalue in N-1 contingency condition. It is made using all branches in the system and specific branches according to the IBPF index. The test system used is the IEEE 118 nodes. (author)

  16. WAVELET TRANSFORM ANALYSIS OF ELECTROMYOGRAPHY KUNG FU STRIKES DATA

    Directory of Open Access Journals (Sweden)

    Ana Carolina de Miranda Marzullo

    2009-11-01

    Full Text Available In martial arts and contact sports strikes are performed at near maximum speeds. For that reason, electromyography (EMG analysis of such movements is non-trivial. This paper has three main goals: firstly, to investigate the differences in the EMG activity of muscles during strikes performed with and without impacts; secondly, to assess the advantages of using Sum of Significant Power (SSP values instead of root mean square (rms values when analyzing EMG data; and lastly to introduce a new method of calculating median frequency values using wavelet transforms (WMDF. EMG data of the deltoid anterior (DA, triceps brachii (TB and brachioradialis (BR muscles were collected from eight Kung Fu practitioners during strikes performed with and without impacts. SSP results indicated significant higher muscle activity (p = 0.023 for the strikes with impact. WMDF results, on the other hand, indicated significant lower values (p = 0. 007 for the strikes with impact. SSP results presented higher sensitivity than rms to quantify important signal differences and, at the same time, presented lower inter-subject coefficient of variations. The result of increase in SSP values and decrease in WMDF may suggest better synchronization of motor units for the strikes with impact performed by the experienced Kung Fu practitioners

  17. VARIATION OF STRIKE INCENTIVES IN DEEP REDUCTIONS; FINAL

    International Nuclear Information System (INIS)

    G.H. CANAVAN

    2001-01-01

    This note studies the sensitivity of strike incentives to deep offensive force reductions using exchange, cost, and game theoretic decision models derived and discussed in companion reports. As forces fall, weapon allocations shift from military to high value targets, with the shift being half complete at about 1,000 weapons. By 500 weapons, the first and second strikes are almost totally on high value. The dominant cost for striking first is that of damage to one's high value, which is near total absent other constraints, and hence proportional to preferences for survival of high value. Changes in military costs are largely offsetting, so total first strike costs change little. The resulting costs at decision nodes are well above the costs of inaction, so the preferred course is inaction for all offensive reductions studied. As the dominant cost for striking first is proportional to the preference for survival of high value. There is a wide gap between the first strike cost and that of inaction for the parameters studied here. These conclusions should be insensitive to significant reductions in the preference for survival of high value, which is the most sensitive parameter

  18. Breaking the Myth of Flexible Work: Contingent Work in Toronto. A Study Conducted by the Contingent Workers Project.

    Science.gov (United States)

    de Wolff, Alice

    A survey of 205 people, 4 group interviews with approximately 30 people, and 6 design and analysis meetings involving approximately 40 people were conducted in a 1999 participatory study of contingent workers in Toronto. (Contingent work was defined to be lower-waged forms of non-permanent work arrangements that include contracting, employment…

  19. Contingent negative variation of mood disorder patients

    Institute of Scientific and Technical Information of China (English)

    Yingzhi Lu; Wenbin Zong; Qingtao Ren; Jinyu Pu; Jun Chen; Juan Li; Xingshi Chen; Yong Wang

    2011-01-01

    Studies on brain-evoked potential and contingent negative variation (CNV) in mood disorder remain controversial. To date, no CNV difference between unipolar and bipolar depression has been reported. Brain-evoked potentials were measured in the present study to analyze CNV in three subtypes of mood disorder (mania, unipolar depression, and bipolar depression), and these results were compared with normal controls. In the mania group, CNV amplitude B was greater than in controls, and the depression group exhibited lower CNV amplitude B and smaller A-S'2 area, and prolonged post-imperative negative variation latency. The CNV comparison between unipolar and bipolar depression found that the prolonged post-imperative negative variation latency was only in unipolar depression. These results suggest that prolonged post-imperative negative variation latency is a characteristic of unipolar depression, and CNV amplitude change is a state characteristic of mood disorder patients.

  20. Social contingencies, the aged, and public policy.

    Science.gov (United States)

    Hudson, R B

    1993-01-01

    Today's older population is notably different than it was a few decades ago, both in well-being and in diversity, a shift that must be acknowledged in public policy. The U.S. social insurance system overprotects against highly likely, predictable, and nonvolatile events at the expense of more unlikely, potentially catastrophic, and less volatile events. The public sector, therefore, should move toward proportionally emphasizing health-related, functionally impairing events rather than income maintenance; the private sector is better suited to insuring against predictable and nonvolatile old-age events. A contingent event scheme would: (a) encourage the growth of long-term-care insurance; (b) help bridge the gap between those arguing for greater "efficiencies" in social welfare spending and those pressing for new universal benefits; and (c) bring a new perspective to the "generational equity" debate.

  1. Historical contingency in fluviokarst landscape evolution

    Science.gov (United States)

    Phillips, Jonathan D.

    2018-02-01

    Lateral and vertical erosion at meander bends in the Kentucky River gorge area has created a series of strath terraces on the interior of incised meander bends. These represent a chronosequence of fluviokarst landscape evolution from the youngest valley side transition zone near the valley bottom to the oldest upland surface. This five-part chronosequence (not including the active river channel and floodplain) was analyzed in terms of the landforms that occur at each stage or surface. These include dolines, uvalas, karst valleys, pocket valleys, unincised channels, incised channels, and cliffs (smaller features such as swallets and shafts also occur). Landform coincidence analysis shows higher coincidence indices (CI) than would be expected based on an idealized chronosequence. CI values indicate genetic relationships (common causality) among some landforms and unexpected persistence of some features on older surfaces. The idealized and two observed chronosequences were also represented as graphs and analyzed using algebraic graph theory. The two field sites yielded graphs more complex and with less historical contingency than the idealized sequence. Indeed, some of the spectral graph measures for the field sites more closely approximate a purely hypothetical no-historical-contingency benchmark graph. The deviations of observations from the idealized expectations, and the high levels of graph complexity both point to potential transitions among landform types as being the dominant phenomenon, rather than canalization along a particular evolutionary pathway. As the base level of both the fluvial and karst landforms is lowered as the meanders expand, both fluvial and karst denudation are rejuvenated, and landform transitions remain active.

  2. Comparison of accuracy in predicting emotional instability from MMPI data: fisherian versus contingent probability statistics

    Energy Technology Data Exchange (ETDEWEB)

    Berghausen, P.E. Jr.; Mathews, T.W.

    1987-01-01

    The security plans of nuclear power plants generally require that all personnel who are to have access to protected areas or vital islands be screened for emotional stability. In virtually all instances, the screening involves the administration of one or more psychological tests, usually including the Minnesota Multiphasic Personality Inventory (MMPI). At some plants, all employees receive a structured clinical interview after they have taken the MMPI and results have been obtained. At other plants, only those employees with dirty MMPI are interviewed. This latter protocol is referred to as interviews by exception. Behaviordyne Psychological Corp. has succeeded in removing some of the uncertainty associated with interview-by-exception protocols by developing an empirically based, predictive equation. This equation permits utility companies to make informed choices regarding the risks they are assuming. A conceptual problem exists with the predictive equation, however. Like most predictive equations currently in use, it is based on Fisherian statistics, involving least-squares analyses. Consequently, Behaviordyne Psychological Corp., in conjunction with T.W. Mathews and Associates, has just developed a second predictive equation, one based on contingent probability statistics. The particular technique used in the multi-contingent analysis of probability systems (MAPS) approach. The present paper presents a comparison of predictive accuracy of the two equations: the one derived using Fisherian techniques versus the one thing contingent probability techniques.

  3. Comparison of accuracy in predicting emotional instability from MMPI data: fisherian versus contingent probability statistics

    International Nuclear Information System (INIS)

    Berghausen, P.E. Jr.; Mathews, T.W.

    1987-01-01

    The security plans of nuclear power plants generally require that all personnel who are to have access to protected areas or vital islands be screened for emotional stability. In virtually all instances, the screening involves the administration of one or more psychological tests, usually including the Minnesota Multiphasic Personality Inventory (MMPI). At some plants, all employees receive a structured clinical interview after they have taken the MMPI and results have been obtained. At other plants, only those employees with dirty MMPI are interviewed. This latter protocol is referred to as interviews by exception. Behaviordyne Psychological Corp. has succeeded in removing some of the uncertainty associated with interview-by-exception protocols by developing an empirically based, predictive equation. This equation permits utility companies to make informed choices regarding the risks they are assuming. A conceptual problem exists with the predictive equation, however. Like most predictive equations currently in use, it is based on Fisherian statistics, involving least-squares analyses. Consequently, Behaviordyne Psychological Corp., in conjunction with T.W. Mathews and Associates, has just developed a second predictive equation, one based on contingent probability statistics. The particular technique used in the multi-contingent analysis of probability systems (MAPS) approach. The present paper presents a comparison of predictive accuracy of the two equations: the one derived using Fisherian techniques versus the one thing contingent probability techniques

  4. 11. Strategic planning.

    Science.gov (United States)

    2014-05-01

    There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.

  5. Resurgence of instrumental behavior after an abstinence contingency.

    Science.gov (United States)

    Bouton, Mark E; Schepers, Scott T

    2014-06-01

    In resurgence, an extinguished instrumental behavior (R1) recovers when a behavior that has replaced it (R2) is also extinguished. The phenomenon may be relevant to understanding relapse that can occur after the termination of "contingency management" treatments, in which an unwanted behavior (e.g., substance abuse) is reduced by reinforcing an alternative behavior. When reinforcement is discontinued, the unwanted behavior might resurge. However, unlike most resurgence experiments, contingency management treatments also introduce a negative contingency, in which reinforcers are not delivered unless the client has abstained from the unwanted behavior. In two experiments with rats, we therefore examined the effects of adding a negative "abstinence" contingency to the resurgence design. During response elimination, R2 was not reinforced unless R1 had not been emitted for a minimum period of time (45, 90, or 135 s). In both experiments, adding such a contingency to simple R1 extinction reduced, but did not eliminate, resurgence. In Experiment 2, we found the same effect in a yoked group that could earn reinforcers for R2 at the same points in time as the negative-contingency group, but without the requirement to abstain from R1. Thus, the negative contingency per se did not contribute to the reduction in resurgence. These results suggest that the contingency reduced resurgence by making reinforcers more difficult to earn and more widely spaced in time. This could have allowed the animal to learn that R1 was extinguished in the "context" of infrequent reinforcement-a context more like that of resurgence testing. The results are thus consistent with a contextual (renewal) account of resurgence. The method might provide a better model of relapse after termination of a contingency management treatment.

  6. Predicting timing of foot strike during running, independent of striking technique, using principal component analysis of joint angles.

    Science.gov (United States)

    Osis, Sean T; Hettinga, Blayne A; Leitch, Jessica; Ferber, Reed

    2014-08-22

    As 3-dimensional (3D) motion-capture for clinical gait analysis continues to evolve, new methods must be developed to improve the detection of gait cycle events based on kinematic data. Recently, the application of principal component analysis (PCA) to gait data has shown promise in detecting important biomechanical features. Therefore, the purpose of this study was to define a new foot strike detection method for a continuum of striking techniques, by applying PCA to joint angle waveforms. In accordance with Newtonian mechanics, it was hypothesized that transient features in the sagittal-plane accelerations of the lower extremity would be linked with the impulsive application of force to the foot at foot strike. Kinematic and kinetic data from treadmill running were selected for 154 subjects, from a database of gait biomechanics. Ankle, knee and hip sagittal plane angular acceleration kinematic curves were chained together to form a row input to a PCA matrix. A linear polynomial was calculated based on PCA scores, and a 10-fold cross-validation was performed to evaluate prediction accuracy against gold-standard foot strike as determined by a 10 N rise in the vertical ground reaction force. Results show 89-94% of all predicted foot strikes were within 4 frames (20 ms) of the gold standard with the largest error being 28 ms. It is concluded that this new foot strike detection is an improvement on existing methods and can be applied regardless of whether the runner exhibits a rearfoot, midfoot, or forefoot strike pattern. Copyright © 2014 Elsevier Ltd. All rights reserved.

  7. Application of the IPEBS method to dynamic contingency analysis

    Energy Technology Data Exchange (ETDEWEB)

    Martins, A C.B. [FURNAS, Rio de Janeiro, RJ (Brazil); Pedroso, A S [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil)

    1994-12-31

    Dynamic contingency analysis is certainly a demanding task in the context of dynamic performance evaluation. This paper presents the results of a test for checking the contingency screening capability of the IPEBS method. A brazilian 1100-bus, 112-gen system was used in the test; the ranking of the contingencies based on critical clearing times obtained with IPEBS, was compared with the ranking derived from detailed time-domain simulation. The results of this comparison encourages us to recommended the use of the method in industry applications, in a complementary basis to the current method of time domain simulation. (author) 5 refs., 1 fig., 2 tabs.

  8. Electric converters of electromagnetic strike machine with battery power

    Science.gov (United States)

    Usanov, K. M.; Volgin, A. V.; Kargin, V. A.; Moiseev, A. P.; Chetverikov, E. A.

    2018-03-01

    At present, the application of pulse linear electromagnetic engines to drive strike machines for immersion of rod elements into the soil, strike drilling of shallow wells, dynamic probing of soils is recognized as quite effective. The pulse linear electromagnetic engine performs discrete consumption and conversion of electrical energy into mechanical work. Pulse dosing of a stream transmitted by the battery source to the pulse linear electromagnetic engine of the energy is provided by the electrical converter. The electric converters with the control of an electromagnetic strike machine as functions of time and armature movement, which form the unipolar supply pulses of voltage and current necessary for the normal operation of a pulse linear electromagnetic engine, are proposed. Electric converters are stable in operation, implement the necessary range of output parameters control determined by the technological process conditions, have noise immunity and automatic disconnection of power supply in emergency modes.

  9. VARIATION OF STRIKE INCENTIVES WITH DAMAGE PREFERENCES; FINAL

    International Nuclear Information System (INIS)

    G. CANAVAN

    2001-01-01

    For START III level forces, strike allocations and magnitudes vary little with L, but first strike costs vary directly with L, which means that for K reflecting a preference for the survival of high value targets over their destruction and a preference for high value over military targets, the costs of action are far greater than those of inaction for a wide range of values of damage preference L. Thus, if both sides have much greater preferences for the survival of their high value targets than for military targets or destruction, they do not see a net incentive to strike, and crises are terminated by inaction. Recent decades suggest strong preferences for the survival of high value and that this has contributed to the lack of direct conflict during that period

  10. Joint stiffness and running economy during imposed forefoot strike before and after a long run in rearfoot strike runners.

    Science.gov (United States)

    Melcher, Daniel A; Paquette, Max R; Schilling, Brian K; Bloomer, Richard J

    2017-12-01

    Research has focused on the effects of acute strike pattern modifications on lower extremity joint stiffness and running economy (RE). Strike pattern modifications on running biomechanics have mostly been studied while runners complete short running bouts. This study examined the effects of an imposed forefoot strike (FFS) on RE and ankle and knee joint stiffness before and after a long run in habitual rearfoot strike (RFS) runners. Joint kinetics and RE were collected before and after a long run. Sagittal joint kinetics were computed from kinematic and ground reaction force data that were collected during over-ground running trials in 13 male runners. RE was measured during treadmill running. Knee flexion range of motion, knee extensor moment and ankle joint stiffness were lower while plantarflexor moment and knee joint stiffness were greater during imposed FFS compared with RFS. The long run did not influence the difference in ankle and knee joint stiffness between strike patterns. Runners were more economical during RFS than imposed FFS and RE was not influenced by the long run. These findings suggest that using a FFS pattern towards the end of a long run may not be mechanically or metabolically beneficial for well-trained male RFS runners.

  11. [Force-feeding of hunger-striking prisoners].

    Science.gov (United States)

    Glick, Shimon

    2014-09-01

    In contrast to the position of the World Medical Association and the Ethics Council of the Israel Medical Association, the author argues for forced-feeding of hunger-striking prisoners when their condition reaches a stage of danger of death or permanent injury. This position is based on the priority of human life over autonomy, and of a communitarian ethic. This position is supported by a District Court decision ordering the feeding of a hunger-striking prisoner, by a Supreme Court decision imposing surgery on a non-consenting prisoner, and in line with Israel's Patient's Right Law.

  12. MORE THAN A LABOR DISPUTE: THE PATCO STRIKE OF 1981

    Directory of Open Access Journals (Sweden)

    Paul L. Butterworth

    2005-01-01

    Full Text Available On August 3, 1981, 13,000 air traffic controllers walked off the job. Under US law, the strike was illegal. President Ronald Reagan ordered the strikers as a group to return to work; when they did not, he ordered individual strikers to return, and again they refused. Two days later the president fired the strikers. Reagan's action transformed relations between organized labor and American management, and created the worst turbulence to hit the American airways in recent history. “More Than a Labor Dispute” examines the work stoppage and aftermath through the eyes of two controllers and a pilot, all of whom worked during the strike.

  13. Remarkable rates of lightning strike mortality in Malawi.

    Science.gov (United States)

    Mulder, Monique Borgerhoff; Msalu, Lameck; Caro, Tim; Salerno, Jonathan

    2012-01-01

    Livingstone's second mission site on the shore of Lake Malawi suffers very high rates of consequential lightning strikes. Comprehensive interviewing of victims and their relatives in seven Traditional Authorities in Nkhata Bay District, Malawi revealed that the annual rate of consequential strikes was 419/million, more than six times higher than that in other developing countries; the rate of deaths from lightning was 84/million/year, 5.4 times greater than the highest ever recorded. These remarkable figures reveal that lightning constitutes a significant stochastic source of mortality with potential life history consequences, but it should not deflect attention away from the more prominent causes of mortality in this rural area.

  14. 40 CFR 300.205 - Planning and coordination structure.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Planning and coordination structure. 300.205 Section 300.205 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.205 Planning and coordination structure. (a...

  15. 25 CFR 39.502 - How does a school apply for contingency funds?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How does a school apply for contingency funds? 39.502... EQUALIZATION PROGRAM Contingency Fund § 39.502 How does a school apply for contingency funds? To apply for contingency funds, a school must send a request to the ELO. The ELO must send the request to the Director for...

  16. 25 CFR 39.503 - How can a school use contingency funds?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How can a school use contingency funds? 39.503 Section 39.503 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contingency Fund § 39.503 How can a school use contingency funds? Contingency funds can be...

  17. 48 CFR 403.405 - Misrepresentations or violations of the Covenant Against Contingent Fees.

    Science.gov (United States)

    2010-10-01

    ... violations of the Covenant Against Contingent Fees. 403.405 Section 403.405 Federal Acquisition Regulations... Contingent Fees 403.405 Misrepresentations or violations of the Covenant Against Contingent Fees. (a) A suspected misrepresentation or violation of the Covenant Against Contingent Fees shall be documented in...

  18. An analysis of contingencies for making casks available for use during the early years of Federal Waste Management System operations

    International Nuclear Information System (INIS)

    Johnson, P.E.; Joy, D.S.; Pope, R.B.; Shappert, L.B.; Wankerl, M.W.; Best, R.E.; Schmid, S.; Danese, F.L.

    1992-01-01

    A study has been performed to examine the contingencies that could be pursued by the Department of Energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) for shipping spent fuel beginning in 1998. OCRWM's current plan is to initiate operations using early production units of Initiative I truck and rail/barge casks that are presently being designed. Contingencies to this plan were considered in case some unforeseen event occurs that precludes the Initiative I casks from entering into service early in 1998 in sufficient quantities (both numbers and types) to satisfy DOE's shipping needs. Specifically, the study addressed the potential availability of cask systems, selected several cask usage scenarios, determined the requirements for casks under these scenarios, generically assessed different strategies for acquiring casks or the use of casks, and generically assessed cask fabrication capabilities. Issues concerning both domestic and foreign resources were addressed with a focus on the first five years of Federal Waste Management System (FWMS) operation

  19. Contingency Management and deliberative decision-making processes

    Directory of Open Access Journals (Sweden)

    Paul S. Regier

    2015-06-01

    Full Text Available Contingency Management is an effective treatment for drug addiction. The current explanation for its success is rooted in alternative reinforcement theory. We suggest that alternative reinforcement theory is inadequate to explain the success of Contingency Management and produce a model based on demand curves that show how little the monetary rewards offered in this treatment would affect drug use. Instead, we offer an explanation of its success based on the concept that it accesses deliberative decision-making processes. We suggest that Contingency Management is effective because it offers a concrete and immediate alternative to using drugs, which engages deliberative processes, improves the ability of those deliberative processes to attend to non-drug options, and offsets more automatic action-selection systems. This theory makes explicit predictions that can be tested, suggests which users will be most helped by Contingency Management, and suggests improvements in its implementation.

  20. Analyzing Contingency Contracting Purchases for Operation Iraqi Freedom (Unrestricted Version)

    National Research Council Canada - National Science Library

    Baldwin, Laura H; Ausink, John A; Campbell, Nancy F; Drew, John G; Roll, Jr, Charles R

    2008-01-01

    .... First, the contracting community did not have a comprehensive, detailed database of contingency purchases that would allow analyses of the types and amounts of goods and services purchased to support...

  1. Application of Contingency Theories to the Supervision of Student Teachers.

    Science.gov (United States)

    Phelps, Julia D.

    1985-01-01

    This article examines selected approaches to student teacher supervision within the context of contingency theory. These include authentic supervision, developmental supervision, and supervision based on the student's level of maturity. (MT)

  2. Contingency inferences driven by base rates: Valid by sampling

    Directory of Open Access Journals (Sweden)

    Florian Kutzner

    2011-04-01

    Full Text Available Fiedler et al. (2009, reviewed evidence for the utilization of a contingency inference strategy termed pseudocontingencies (PCs. In PCs, the more frequent levels (and, by implication, the less frequent levels are assumed to be associated. PCs have been obtained using a wide range of task settings and dependent measures. Yet, the readiness with which decision makers rely on PCs is poorly understood. A computer simulation explored two potential sources of subjective validity of PCs. First, PCs are shown to perform above chance level when the task is to infer the sign of moderate to strong population contingencies from a sample of observations. Second, contingency inferences based on PCs and inferences based on cell frequencies are shown to partially agree across samples. Intriguingly, this criterion and convergent validity are by-products of random sampling error, highlighting the inductive nature of contingency inferences.

  3. Automated Contingency Management for Advanced Propulsion Systems, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Automated Contingency Management (ACM), or the ability to confidently and autonomously adapt to fault conditions with the goal of still achieving mission objectives,...

  4. Contingencies and onus in the delictual law of damages | Steynberg ...

    African Journals Online (AJOL)

    Potchefstroom Electronic Law Journal/Potchefstroomse Elektroniese Regsblad ... evidentiary meaning, do not fit naturally into the theory of proof in the case of contingencies. ... In principle, one can say that the plaintiff must adduce evidence of ...

  5. 41 Appraisal of the Performance of Contingency Cost Provision for ...

    African Journals Online (AJOL)

    Arc. Usman A. Jalam

    ATBU Journal of Environmental Technology, 4, (1), December 2011. 41. Appraisal of the ... quantitative risks analysis in the determination of contingency fund. Therefore, to improve the ... the financial performance of constructed facilities ...

  6. Skype me! Socially contingent interactions help toddlers learn language.

    Science.gov (United States)

    Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta M

    2014-01-01

    Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This study focuses on whether social contingency might support word learning. Toddlers aged 24-30 months (N = 36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and noncontingent video training (yoked video). Results suggest that children only learned novel verbs in socially contingent interactions (live interactions and video chat). This study highlights the importance of social contingency in interactions for language learning and informs the literature on learning through screen media as the first study to examine word learning through video chat technology. © 2013 The Authors. Child Development © 2013 Society for Research in Child Development, Inc.

  7. Contingency Management and Deliberative Decision-Making Processes.

    Science.gov (United States)

    Regier, Paul S; Redish, A David

    2015-01-01

    Contingency management is an effective treatment for drug addiction. The current explanation for its success is rooted in alternative reinforcement theory. We suggest that alternative reinforcement theory is inadequate to explain the success of contingency management and produce a model based on demand curves that show how little the monetary rewards offered in this treatment would affect drug use. Instead, we offer an explanation of its success based on the concept that it accesses deliberative decision-making processes. We suggest that contingency management is effective because it offers a concrete and immediate alternative to using drugs, which engages deliberative processes, improves the ability of those deliberative processes to attend to non-drug options, and offsets more automatic action-selection systems. This theory makes explicit predictions that can be tested, suggests which users will be most helped by contingency management, and suggests improvements in its implementation.

  8. Contingency Table Browser - prediction of early stage protein structure.

    Science.gov (United States)

    Kalinowska, Barbara; Krzykalski, Artur; Roterman, Irena

    2015-01-01

    The Early Stage (ES) intermediate represents the starting structure in protein folding simulations based on the Fuzzy Oil Drop (FOD) model. The accuracy of FOD predictions is greatly dependent on the accuracy of the chosen intermediate. A suitable intermediate can be constructed using the sequence-structure relationship information contained in the so-called contingency table - this table expresses the likelihood of encountering various structural motifs for each tetrapeptide fragment in the amino acid sequence. The limited accuracy with which such structures could previously be predicted provided the motivation for a more indepth study of the contingency table itself. The Contingency Table Browser is a tool which can visualize, search and analyze the table. Our work presents possible applications of Contingency Table Browser, among them - analysis of specific protein sequences from the point of view of their structural ambiguity.

  9. Self-Aware Aerospace Vehicle Contingency Management, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Aurora Flight Sciences, with Agent Oriented Software, proposes to develop a contingency management system that dynamically performs decision-making based on both...

  10. ACCRUAL OF LIABILITIES AND CONTINGENT ASSETS

    Directory of Open Access Journals (Sweden)

    Elena Ilie

    2011-12-01

    Full Text Available International Financial Reporting Standards together with Public Sector Accounting Standards are based on professional reasoning by appealing to principles that can lead to several solutions for a certain problem. In this respect Romanian economic mechanisms have a high level of rigidity in the implementation of accounting concepts and principles so that it is important to highlight the aspects that generate added value in the current economic climate. Even since 2005 the harmonization of Romanian accounting with the directives of International Accounting Standards, which came to support the harmonization of rules and principles concerning the development of annual financial statements of public institutions, is the most important and essential challenge for administrative environment. Assets and contingent liabilities are elements which in terms of the law cannot be included in the assets of a public institution that is why accounting of these elements must be performed using special off-balance sheet accounts. The purpose of this work emphasizes the opportunity and the recognition of economic events whose elements should be reflected in balance sheet, but also the appropriate and necessary moment of making entries over special accounts off the balance sheet in accordance with IPSAS 19.

  11. Contingent convertible bonds as countercyclical capital measures

    Directory of Open Access Journals (Sweden)

    Francois Liebenberg

    2017-06-01

    Aim: The effectiveness of the CCB during contractions is not obvious. Contingent convertible (CoCo bonds – which are bond-like until triggered by a deterioration of a prescribed capital metric, at which point they convert into a form of equity – are explored as a supplementary countercyclical capital measure for such periods to establish whether or not they function effectively. Setting: The analysis is undertaken using global bank CoCo data, and then applied to South African banks. Methods: The Hodrick Prescott filter was applied to empirical historical data. Results: The CCB functions as a good countercyclical capital measure in times of economic expansion by absorbing losses and stabilising the capital base through equity issuance. Conclusion: The issuance of CoCo bonds – if their trigger mechanisms are designed correctly – may prove helpful to banks and the broader financial sector in times of economic contraction through the countercyclical capital properties that manifest through CoCo bonds under these economic conditions.

  12. Contingency Analysis of Cascading Line Outage Events

    Energy Technology Data Exchange (ETDEWEB)

    Thomas L Baldwin; Magdy S Tawfik; Miles McQueen

    2011-03-01

    As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

  13. Contingency and construction: from mimesis to postmodernism

    Directory of Open Access Journals (Sweden)

    P. V. Zima

    1997-04-01

    Full Text Available In this article the transition from literary realism (Balzac, George Eliot, Verga is described as a shift from mimesis to constructivism. It is indicated how the realist confidence in the ability of the writer to represent reality as such yields to a modernist skepticism which recognises the contingent character of all fictional constructs. In spite of this discovery, modernists such as Kafka, Proust and Sartre still believe in a meaningful search for reality, authenticity and truth. This belief seems to disappear in the works of postmodernist authors such as Robbe-Grillet, Eco or Fowles who tend to dissociate fiction from any kind of meaningful search, transforming it into a game: a gadget for the reader. The author, who adopts the perspective of Critical Theory, argues towards the end of the article that the latter is modernist insofar as it refuses to follow the postmodernists in their playful abandoning of key realist and modernist concepts such as truth, authenticity and critique.

  14. Associationism and cognition: human contingency learning at 25.

    Science.gov (United States)

    Shanks, David R

    2007-03-01

    A major topic within human learning, the field of contingency judgement, began to emerge about 25 years ago following publication of an article on depressive realism by Alloy and Abramson (1979). Subsequently, associationism has been the dominant theoretical framework for understanding contingency learning but this has been challenged in recent years by an alternative cognitive or inferential approach. This article outlines the key conceptual differences between these approaches and summarizes some of the main methods that have been employed to distinguish between them.

  15. Double contingency: A practical example of a risk acceptance philosophy

    International Nuclear Information System (INIS)

    Bazley, J.J.

    1995-01-01

    The double-contingency principle as defined in ANSI/ANS-8.1 specifies that open-quotes Process designs should, in general, incorporate sufficient factors of safety to require at least two unlikely, independent, and concurrent changes in process conditions before a criticality accident is possible.close quotes The following practical example has been used to familiarize plant operators and managers and train criticality safety engineers in double contingency

  16. Contingent Conversion Convertible Bond: New avenue to raise bank capital

    OpenAIRE

    DI GIROLAMO FRANCESCA; CAMPOLONGO FRANCESCA; DE SPIEGELEER JAN; SCHOUTENS WIM

    2016-01-01

    This paper provides an in-depth analysis of the structuring and the pricing of an innovative financial market product. This instrument is called a contingent conversion convertible bond or "CoCoCo". This hybrid bond is itself a combination of two other hybrid instruments: a contingent convertible ("CoCo") and a convertible bond. This combination introduces more complexity in the structure but it also allows investors to profit from strong share price performances. This upside potential is add...

  17. [Making up tuberculosis risk groups from decreed contingents].

    Science.gov (United States)

    Kucherov, A L; Il'icheva, E Iu

    2001-01-01

    The paper provides materials to make up risk groups from decreed contingents by using the database developed and introduced in the Novomoskovsk district, as well as a programme for rapid determination of the risk of tuberculosis. This procedure reduces a scope of fluorographic surveys among the decreed contingents, as well as their expenditures by 60%. Moreover, it may be useful for professional choice in the employment of the decreed persons, which may promote a decrease in the incidence of tuberculosis among them.

  18. Mini-Membrane Evaporator for Contingency Spacesuit Cooling

    Science.gov (United States)

    Makinen, Janice V.; Bue, Grant C.; Campbell, Colin; Petty, Brian; Craft, Jesse; Lynch, William; Wilkes, Robert; Vogel, Matthew

    2015-01-01

    The next-generation Advanced Extravehicular Mobility Unit (AEMU) Portable Life Support System (PLSS) is integrating a number of new technologies to improve reliability and functionality. One of these improvements is the development of the Auxiliary Cooling Loop (ACL) for contingency crewmember cooling. The ACL is a completely redundant, independent cooling system that consists of a small evaporative cooler--the Mini Membrane Evaporator (Mini-ME), independent pump, independent feedwater assembly and independent Liquid Cooling Garment (LCG). The Mini-ME utilizes the same hollow fiber technology featured in the full-sized AEMU PLSS cooling device, the Spacesuit Water Membrane Evaporator (SWME), but Mini-ME occupies only approximately 25% of the volume of SWME, thereby providing only the necessary crewmember cooling in a contingency situation. The ACL provides a number of benefits when compared with the current EMU PLSS contingency cooling technology, which relies upon a Secondary Oxygen Vessel; contingency crewmember cooling can be provided for a longer period of time, more contingency situations can be accounted for, no reliance on a Secondary Oxygen Vessel (SOV) for contingency cooling--thereby allowing a reduction in SOV size and pressure, and the ACL can be recharged-allowing the AEMU PLSS to be reused, even after a contingency event. The first iteration of Mini-ME was developed and tested in-house. Mini-ME is currently packaged in AEMU PLSS 2.0, where it is being tested in environments and situations that are representative of potential future Extravehicular Activities (EVA's). The second iteration of Mini-ME, known as Mini-ME2, is currently being developed to offer more heat rejection capability. The development of this contingency evaporative cooling system will contribute to a more robust and comprehensive AEMU PLSS.

  19. No Win, No Fee: Some Economics of Contingent Legal Fees.

    OpenAIRE

    Gravelle, Hugh; Waterson, Michael

    1993-01-01

    This paper analyzes the effects on the litigation process of alternative contracts between plaintiffs and their lawyers. Three contracts are compared: normal (hourly fee), contingent mark up fees, and contingent share contracts. The focus is on the first two, a recent change in English law governing legal fees providing the motivation. The influences of the contract type on the acceptance of settlement offers, the settlement probability, the accident probability, the demand for trials, and th...

  20. Torts Liability for Strike Action and Third Party Rights.

    Science.gov (United States)

    Raday, Frances

    1979-01-01

    Studies the nature of the torts liability incurred in strikes and the extent of existing immunities bestowed on strikers and their organizers, and explores the principles that should govern liability and immunity. Available from Israel Law Review Association, c/o Faculty of Law, Hebrew University of Jerusalem, Mount Scopus, P.O.B. 24100, Jerusalem…

  1. Delayed Post Mortem Predation in Lightning Strike Carcasses ...

    African Journals Online (AJOL)

    Campbell Murn

    An adult giraffe was struck dead by lightning on a game farm outside. Phalaborwa, South Africa in March 2014. Interestingly, delayed post-mortem predation occurred on the carcass, which according to the farm owners was an atypical phenomenon for the region. Delayed post-mortem scavenging on lightning strike ...

  2. EDITORIAL Plagiarism - time to strike at the epidemic

    African Journals Online (AJOL)

    admin

    Plagiarism - time to strike at the epidemic. Lukman Yusuf1, Abraham Aseffa2. We live in a globalized world where information is instantly shared across continents. The number of biomedical journals available for reference is quite enormous and there is a sudden huge surge of free open access journals in the last few years ...

  3. Analysis of the effects of frequent strikes on academic performance ...

    African Journals Online (AJOL)

    The history of Academic Staff Union of Universities (ASUU)'s strike can be traced back to 1978, the period of the beginning of the decline in the oil boom, when the country faced the consequences of the failure by its rulers to use the oil wealth to generate production and a social welfare system. Military dictatorship had ...

  4. When the Corporate Storm Strikes the Academy: Faculty Response Required

    Science.gov (United States)

    DeBoy, James L.

    2015-01-01

    When the corporate storm strikes the academy, faculty must be willing and able to repel administrative assaults upon academic freedom, shared governance, and tenure. This paper will describe the on-going clash between administrators who embrace the corporate mindset and faculty who cherish traditions of shared governance and collegial…

  5. Force, reaction time, and precision of Kung Fu strikes.

    Science.gov (United States)

    Neto, Osmar Pinto; Bolander, Richard; Pacheco, Marcos Tadeu Tavares; Bir, Cynthia

    2009-08-01

    The goal was to compare values of force, precision, and reaction time of several martial arts punches and palm strikes performed by advanced and intermediate Kung Fu practitioners, both men and women. 13 Kung Fu practitioners, 10 men and three women, participated. Only the men, three advanced and seven intermediate, were considered for comparisons between levels. Reaction time values were obtained using two high speed cameras that recorded each strike at 2500 Hz. Force of impact was measured by a load cell. For comparisons of groups, force data were normalized by participant's body mass and height. Precision of the strikes was determined by a high speed pressure sensor. The results show that palm strikes were stronger than punches. Women in the study presented, on average, lower values of reaction time and force but higher values of precision than men. Advanced participants presented higher forces than intermediate participants. Significant negative correlations between the values of force and precision and the values of force and reaction time were also found.

  6. Striking Inside Angola with 32 Battalion | Scheepers | Scientia ...

    African Journals Online (AJOL)

    Scientia Militaria: South African Journal of Military Studies. Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue · Archives · Journal Home > Vol 42, No 1 (2014) >. Log in or Register to get access to full text downloads. Username, Password, Remember me, or Register. Striking Inside Angola with 32 ...

  7. Assemblage of strike-slip faults and tectonic extension and ...

    Indian Academy of Sciences (India)

    12

    the formation, evolution and distribution of these strike-slip faults have important. 80 ...... function of coal-derived gas study for natural gas industry development in China; .... Bohai-Zhangjiakou seismotectonic zone based on 3D visco-elastic ...

  8. Contingency blindness: location-identity binding mismatches obscure awareness of spatial contingencies and produce profound interference in visual working memory.

    Science.gov (United States)

    Fiacconi, Chris M; Milliken, Bruce

    2012-08-01

    The purpose of the present study was to highlight the role of location-identity binding mismatches in obscuring explicit awareness of a strong contingency. In a spatial-priming procedure, we introduced a high likelihood of location-repeat trials. Experiments 1, 2a, and 2b demonstrated that participants' explicit awareness of this contingency was heavily influenced by the local match in location-identity bindings. In Experiment 3, we sought to determine why location-identity binding mismatches produce such low levels of contingency awareness. Our results suggest that binding mismatches can interfere substantially with visual-memory performance. We attribute the low levels of contingency awareness to participants' inability to remember the critical location-identity binding in the prime on a trial-to-trial basis. These results imply a close interplay between object files and visual working memory.

  9. [Contingencies of self-worth in Japanese culture: validation of the Japanese contingencies of self-worth scale].

    Science.gov (United States)

    Uchida, Yukiko

    2008-08-01

    The author developed a Japanese version of the Contingencies of Self-Worth Scale (CSWS) that was originally developed in the United States (Crocker, Luhtanen, Cooper, & Bouvrette, 2003). The Japanese version of the scale measures seven contingencies of self-esteem: Defeating others in competition, appearance, relationship harmony, other's approval, academic competence, virtue, and support of family and friends. Scores on the scale had systematic relationships with related variables, and the scale therefore exhibited satisfactory levels of construct validity: Relationship harmony, other's approval, and support of family and friends were positively correlated with sympathy and interdependence, whereas competitiveness was negatively correlated with sympathy. Moreover, competitiveness and academic achievement contingencies predicted competitive motivation, whereas the support of family and friends contingency predicted self-sufficient motivation. The scale has adequate test-retest reliability and a seven-factor structural model was confirmed. The implications for self-esteem and interpersonal relationships in Japanese culture are discussed.

  10. Management of patients during hunger strike and refeeding phase.

    Science.gov (United States)

    Eichelberger, M; Joray, M L; Perrig, M; Bodmer, M; Stanga, Z

    2014-01-01

    Hunger strikers resuming nutritional intake may develop a life-threatening refeeding syndrome (RFS). Consequently, hunger strikers represent a core challenge for the medical staff. The objective of the study was to test the effectiveness and safety of evidence-based recommendations for prevention and management of RFS during the refeeding phase. This was a retrospective, observational data analysis of 37 consecutive, unselected cases of prisoners on a hunger strike during a 5-y period. The sample consisted of 37 cases representing 33 individual patients. In seven cases (18.9%), the hunger strike was continued during the hospital stay, in 16 episodes (43.2%) cessation of the hunger strike occurred immediately after admission to the security ward, and in 14 episodes (37.9%) during hospital stay. In the refeed cases (n = 30), nutritional replenishment occurred orally, and in 25 (83.3%) micronutrients substitutions were made based on the recommendations. The gradual refeeding with fluid restriction occurred over 10 d. Uncomplicated dyselectrolytemia was documented in 12 cases (40%) within the refeeding phase. One case (3.3%) presented bilateral ankle edemas as a clinical manifestation of moderate RFS. Intensive medical treatment was not necessary and none of the patients died. Seven episodes of continued hunger strike were observed during the entire hospital stay without medical complications. Our data suggested that seriousness and rate of medical complications during the refeeding phase can be kept at a minimum in a hunger strike population. This study supported use of recommendations to optimize risk management and to improve treatment quality and patient safety in this vulnerable population. Copyright © 2014 Elsevier Inc. All rights reserved.

  11. Contingency interim measure for the public water supply at Barnes, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2009-07-09

    This document presents a conceptual design for a contingency interim measure (IM) for treatment of the public water supply system at Barnes, Kansas, should this become necessary. The aquifer that serves the public water supply system at Barnes has been affected by trace to low concentrations of carbon tetrachloride and its degradation product, chloroform. Investigations conducted on behalf of the CCC/USDA by Argonne National Laboratory (Argonne 2008a) have demonstrated that groundwater at the Barnes site is contaminated with carbon tetrachloride at concentrations exceeding the Kansas Tier 2 risk-based screening level (RBSL) and the EPA maximum contaminant level (MCL) of 5.0 {micro}g/L for this compound. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) formerly operated a grain storage facility in Barnes, approximately 800 ft east-southeast of the public water supply wells. Carbon tetrachloride was used in the treatment of grain. Another potential source identified in an investigation conducted for the KDHE (PRC 1996) is the site of a former agriculture building owned by the local school district (USD 223). This building is located immediately east of well PWS3. The potential contingency IM options evaluated in this report include the treatment of groundwater at the public water supply wellheads and the provision of an alternate water supply via Washington County Rural Water District No.2 (RWD 2). This document was developed in accordance with KDHE Bureau of Environmental Remediation (BER) Policy No.BER-RS-029 (Revised) (KDHE 2006a), supplemented by guidance from the KDHE project manager. Upon the approval of this contingency IM conceptual design by the KDHE, the CCC/USDA will prepare a treatment system design document that will contain the following elements: (1) Description of the approved contingency IM treatment method; (2) Drawings and/or schematics provided by the contractor and/or manufacturer of the approved technology; (3) A

  12. Nursing's role in Y2K planning.

    Science.gov (United States)

    Simpson, R L

    1999-04-01

    Why haven't more nurses fulfilled their role in Y2K planning? Nurses need to apply their skills and expertise to solving often overlooked problems such as point-of-service applications, transactions with business partners, and contingency planning.

  13. Implications of Incessant Strike Actions on the Implementation of Technical Education Programme in Nigeria

    Science.gov (United States)

    Adavbiele, J. A.

    2015-01-01

    This paper was designed to x-ray the implications of incessant strike actions on the implementation of Technical education programme in Nigeria. The paper took an exploratory view on the concept of strike actions in Nigeria with particular references on notable strike actions that have occurred in Nigeria. The types of strike were explained and…

  14. Speech Timing Deficit of Stuttering: Evidence from Contingent Negative Variations.

    Directory of Open Access Journals (Sweden)

    Ning Ning

    Full Text Available The aim of the present study was to investigate the speech preparation processes of adults who stutter (AWS. Fifteen AWS and fifteen adults with fluent speech (AFS participated in the experiment. The event-related potentials (ERPs were recorded in a foreperiod paradigm. The warning signal (S1 was a color square, and the following imperative stimulus (S2 was either a white square (the Go signal that required participants to name the color of S1 or a white dot (the NoGo signal that prevents participants from speaking. Three differences were found between AWS and AFS. First, the mean amplitude of the ERP component parietal positivity elicited by S1 (S1-P3 was smaller in AWS than in AFS, which implies that AWS may have deficits in investing working memory on phonological programming. Second, the topographic shift from the early phase to the late phase of contingent negative variation occurred earlier for AWS than for AFS, thus suggesting that the motor preparation process is promoted in AWS. Third, the NoGo effect in the ERP component parietal positivity elicited by S2 (S2-P3 was larger for AFS than for AWS, indicating that AWS have difficulties in inhibiting a planned speech response. These results provide a full picture of the speech preparation and response inhibition processes of AWS. The relationship among these three findings is discussed. However, as stuttering was not manipulated in this study, it is still unclear whether the effects are the causes or the results of stuttering. Further studies are suggested to explore the relationship between stuttering and the effects found in the present study.

  15. Turning negative memories around: Contingency versus devaluation techniques.

    Science.gov (United States)

    Dibbets, Pauline; Lemmens, Anke; Voncken, Marisol

    2018-09-01

    It is assumed that fear responses can be altered by changing the contingency between a conditioned stimulus (CS) and an unconditioned stimulus (US), or by devaluing the present mental representation of the US. The aim of the present study was to compare the efficacy of contingency- and devaluation-based intervention techniques on the diminishment in - and return of fear. We hypothesized that extinction (EXT, contingency-based) would outperform devaluation-based techniques regarding contingency measures, but that devaluation-based techniques would be most effective in reducing the mental representation of the US. Additionally, we expected that incorporations of the US during devaluation would result in less reinstatement of the US averseness. Healthy participants received a fear conditioning paradigm followed by one of three interventions: extinction (EXT, contingency-based), imagery rescripting (ImRs, devaluation-based) or eye movement desensitization and reprocessing (EMDR, devaluation-based). A reinstatement procedure and test followed the next day. EXT was indeed most successful in diminishing contingency-based US expectancies and skin conductance responses (SCRs), but all interventions were equally successful in reducing the averseness of the mental US representation. After reinstatement EXT showed lowest expectancies and SCRs; no differences were observed between the conditions concerning the mental US representation. A partial reinforcement schedule was used, resulting in a vast amount of contingency unaware participants. Additionally, a non-clinical sample was used, which may limit the generalizability to clinical populations. EXT is most effective in reducing conditioned fear responses. Copyright © 2018 Elsevier Ltd. All rights reserved.

  16. Light-induced bird strikes on vessels in Southwest Greenland

    DEFF Research Database (Denmark)

    Merkel, Flemming Ravn; Johansen, Kasper Lambert

    2011-01-01

    Light-induced bird strikes are known to occur when vessels navigate during darkness in icy waters using powerful searchlight. In Southwest Greenland, which is important internationally for wintering seabirds, we collected reports of incidents of bird strikes over 2–3 winters (2006–2009) from navy...... vessels, cargo vessels and trawlers (total n = 19). Forty-one incidents were reported: mainly close to land (birds were reported killed in a single incident. All occurred between 5 p.m. and 6 a.m. and significantly more birds were involved when...... visibility was poor (snow) rather than moderate or good. Among five seabird species reported, the common eider (Somateria mollissima) accounted for 95% of the bird casualties. Based on spatial analyses of data on vessel traffic intensity and common eider density we are able to predict areas with high risk...

  17. Triggered lightning strikes to aircraft and natural intracloud discharges

    Science.gov (United States)

    Mazur, Vladislav

    1989-01-01

    The physical model of Mazur (1989) for triggering lightning strikes by aircraft was used to interpret the initiation of intracloud flashes observed by the French UHF-VHF interferometric system. It is shown that both the intracloud discharges and airplane-triggered lightning strikes were initiated by simultaneous bidirectional development of the negative stepped leader and the positive leader-continous current process. However, the negative stepped leader phase in triggered flashes is of shorter duration (tens of milliseconds), than that in intracloud flashes (usually hundreds of milliseconds). This is considered to be due to the fact that, on the aircraft there is a single initiation process, versus the numerous initiation processes that occur inside the cloud.

  18. Concept of a Conducting Composite Material for Lightning Strike Protection

    OpenAIRE

    Katunin A.; Krukiewicz K.; Herega A.; Catalanotti G.

    2016-01-01

    The paper focuses on development of a multifunctional material which allows conducting of electrical current and simultaneously holds mechanical properties of a polymeric composite. Such material could be applied for exterior fuselage elements of an aircraft in order to minimize damage occurring during lightning strikes. The concept introduced in this paper is presented from the points of view of various scientific disciplines including materials science, chemistry, structural physics and mec...

  19. Oscillation thresholds for "striking outwards" reeds coupled to a resonator

    OpenAIRE

    Silva , Fabrice; Kergomard , Jean; Vergez , Christophe

    2007-01-01

    International audience; This paper considers a "striking outwards" reed coupled to a resonator. This expression, due to Helmholtz, is not discussed here : it corresponds to the most common model of a lip-type valve, when the valve is assumed to be a one degree of freedom oscillator. The presented work is an extension of the works done by Wilson and Beavers (1974), Tarnopolsky (2000). The range of the playing frequencies is investigated. The first results are analytical : when no losses are pr...

  20. F-35 Joint Strike Fighter: Preliminary Observations on Program Progress

    Science.gov (United States)

    2016-03-23

    current fighter aircraft. The cost of extending the lives of current fighter aircraft and acquiring other major weapon systems, while continuing to... Norway . Ongoing Manufacturing and Reliability Progress Continue Page 12 GAO-16-489T rework, and repair costs have remained steady over...Program Progress Why GAO Did This Study With estimated acquisition costs of nearly $400 billion, the F-35 Joint Strike Fighter—also known as the

  1. Foot strike pattern in children during shod-unshod running.

    Science.gov (United States)

    Latorre Román, Pedro Ángel; Balboa, Fernando Redondo; Pinillos, Felipe García

    2017-10-01

    The purpose of this study was to determine the foot strike patterns (FSPs) and neutral support (no INV/EVE and no foot rotation) in children, as well as to determine the influence of shod/unshod conditions and sex. A total of 713 children, aged 6 to 16 years, participated in this study (Age=10.28±2.71years, body mass index [BMI]=19.70±3.91kg/m 2 , 302 girls and 411 boys). A sagittal and frontal-plane video (240Hz) was recorded using a high-speed camcorder, to record the following variables: rearfoot strike (RFS), midfoot strike (MFS), forefoot strike (FFS), inversion/eversion (INV/EVE) and foot rotation on initial contact. RFS prevalence was similar between boys and girls in both shod and unshod conditions. In the unshod condition there was a significant reduction (p<0.001) of RFS prevalence both in boys (shod condition=83.95% vs. 62.65% unshod condition) and in girls (shod condition=87.85% vs. 62.70% unshod condition). No significant differences were found in INV/EVE and foot rotation between sex groups. In the unshod condition there was a significant increase (p<0.001) of neutral support (no INV/EVE) both in boys (shod condition=12.55% vs. 22.22% unshod condition) and in girls (shod condition=17.9% vs. 28.15% unshod condition). In addition, in the unshod condition there is a significant reduction (p<0.001) of neutral support (no foot rotation) both in boys (shod condition=21.55% vs. 11.10% unshod condition) and in girls (shod condition=21.05% vs. 11.95% unshod condition). In children, RFS prevalence is lower than adult's population. Additionally, barefoot running reduced the prevalence of RFS and INV/EVE, however increased foot rotation. Copyright © 2017 Elsevier B.V. All rights reserved.

  2. Simulating Bird Strike on Aircraft Composite Wing Leading Edge.

    OpenAIRE

    Ericsson, Max

    2012-01-01

    In this master thesis project the possibility to model the response of a wing when subjected to bird strike using finite elements is analyzed. Since this transient event lasts only a few milliseconds the used solution method is explicit time integration. The wing is manufactured using carbon fiber laminate. Carbon fiber laminates have orthotropic material properties with different stiffness in different directions. Accordingly, there are damage mechanisms not considered when using metal that ...

  3. Active strike-slip faulting in El Salvador, Central America

    Science.gov (United States)

    Corti, Giacomo; Carminati, Eugenio; Mazzarini, Francesco; Oziel Garcia, Marvyn

    2005-12-01

    Several major earthquakes have affected El Salvador, Central America, during the Past 100 yr as a consequence of oblique subduction of the Cocos plate under the Caribbean plate, which is partitioned between trench-orthogonal compression and strike-slip deformation parallel to the volcanic arc. Focal mechanisms and the distribution of the most destructive earthquakes, together with geomorphologic evidence, suggest that this transcurrent component of motion may be accommodated by a major strike-slip fault (El Salvador fault zone). We present field geological, structural, and geomorphological data collected in central El Salvador that allow the constraint of the kinematics and the Quaternary activity of this major seismogenic strike-slip fault system. Data suggest that the El Salvador fault zone consists of at least two main ˜E-W fault segments (San Vicente and Berlin segments), with associated secondary synthetic (WNW-ESE) and antithetic (NNW-SSE) Riedel shears and NW-SE tensional structures. The two main fault segments overlap in a dextral en echelon style with the formation of an intervening pull-apart basin. Our original geological and geomorphologic data suggest a late Pleistocene Holocene slip rate of ˜11 mm/yr along the Berlin segment, in contrast with low historical seismicity. The kinematics and rates of deformation suggested by our new data are consistent with models involving slip partitioning during oblique subduction, and support the notion that a trench-parallel component of motion between the Caribbean and Cocos plates is concentrated along E-W dextral strike-slip faults parallel to the volcanic arc.

  4. Category learning in the color-word contingency learning paradigm.

    Science.gov (United States)

    Schmidt, James R; Augustinova, Maria; De Houwer, Jan

    2018-04-01

    In the typical color-word contingency learning paradigm, participants respond to the print color of words where each word is presented most often in one color. Learning is indicated by faster and more accurate responses when a word is presented in its usual color, relative to another color. To eliminate the possibility that this effect is driven exclusively by the familiarity of item-specific word-color pairings, we examine whether contingency learning effects can be observed also when colors are related to categories of words rather than to individual words. To this end, the reported experiments used three categories of words (animals, verbs, and professions) that were each predictive of one color. Importantly, each individual word was presented only once, thus eliminating individual color-word contingencies. Nevertheless, for the first time, a category-based contingency effect was observed, with faster and more accurate responses when a category item was presented in the color in which most of the other items of that category were presented. This finding helps to constrain episodic learning models and sets the stage for new research on category-based contingency learning.

  5. The Effectiveness of Gaze-Contingent Control in Computer Games.

    Science.gov (United States)

    Orlov, Paul A; Apraksin, Nikolay

    2015-01-01

    Eye-tracking technology and gaze-contingent control in human-computer interaction have become an objective reality. This article reports on a series of eye-tracking experiments, in which we concentrated on one aspect of gaze-contingent interaction: Its effectiveness compared with mouse-based control in a computer strategy game. We propose a measure for evaluating the effectiveness of interaction based on "the time of recognition" the game unit. In this article, we use this measure to compare gaze- and mouse-contingent systems, and we present the analysis of the differences as a function of the number of game units. Our results indicate that performance of gaze-contingent interaction is typically higher than mouse manipulation in a visual searching task. When tested on 60 subjects, the results showed that the effectiveness of gaze-contingent systems over 1.5 times higher. In addition, we obtained that eye behavior stays quite stabile with or without mouse interaction. © The Author(s) 2015.

  6. Vagal tone during infant contingency learning and its disruption.

    Science.gov (United States)

    Sullivan, Margaret Wolan

    2016-04-01

    This study used contingency learning to examine changes in infants' vagal tone during learning and its disruption. The heart rate of 160 five-month-old infants was recorded continuously during the first of two training sessions as they experienced an audiovisual event contingent on their pulling. Maternal reports of infant temperament were also collected. Baseline vagal tone, a measure of parasympathetic regulation of the heart, was related to vagal levels during the infants' contingency learning session, but not to their learner status. Vagal tone levels did not vary significantly over session minutes. Instead, vagal tone levels were a function of both individual differences in learner status and infant soothability. Vagal levels of infants who learned in the initial session were similar regardless of their soothability; however, vagal levels of infants who learned in a subsequent session differed as a function of soothability. Additionally, vagal levels during contingency disruption were significantly higher among infants in this group who were more soothable as opposed to those who were less soothable. The results suggest that contingency learning and disruption is associated with stable vagal tone in the majority of infants, but that individual differences in attention processes and state associated with vagal tone may be most readily observed during the disruption phase. © 2015 Wiley Periodicals, Inc.

  7. Contingency learning without awareness: evidence for implicit control.

    Science.gov (United States)

    Schmidt, James R; Crump, Matthew J C; Cheesman, Jim; Besner, Derek

    2007-06-01

    The results of four experiments provide evidence for controlled processing in the absence of awareness. Participants identified the colour of a neutral distracter word. Each of four words (e.g., MOVE) was presented in one of the four colours 75% of the time (Experiments 1 and 4) or 50% of the time (Experiments 2 and 3). Colour identification was faster when the words appeared in the colour they were most often presented in relative to when they appeared in another colour, even for participants who were subjectively unaware of any contingencies between the words and the colours. An analysis of sequence effects showed that participants who were unaware of the relation between distracter words and colours nonetheless controlled the impact of the word on performance depending on the nature of the previous trial. A block analysis of contingency-unaware participants revealed that contingencies were learned rapidly in the first block of trials. Experiment 3 showed that the contingency effect does not depend on the level of awareness, thus ruling out explicit strategy accounts. Finally, Experiment 4 showed that the contingency effect results from behavioural control and not from semantic association or stimulus familiarity. These results thus provide evidence for implicit control.

  8. Acquisition of automatic imitation is sensitive to sensorimotor contingency.

    Science.gov (United States)

    Cook, Richard; Press, Clare; Dickinson, Anthony; Heyes, Cecilia

    2010-08-01

    The associative sequence learning model proposes that the development of the mirror system depends on the same mechanisms of associative learning that mediate Pavlovian and instrumental conditioning. To test this model, two experiments used the reduction of automatic imitation through incompatible sensorimotor training to assess whether mirror system plasticity is sensitive to contingency (i.e., the extent to which activation of one representation predicts activation of another). In Experiment 1, residual automatic imitation was measured following incompatible training in which the action stimulus was a perfect predictor of the response (contingent) or not at all predictive of the response (noncontingent). A contingency effect was observed: There was less automatic imitation indicative of more learning in the contingent group. Experiment 2 replicated this contingency effect and showed that, as predicted by associative learning theory, it can be abolished by signaling trials in which the response occurs in the absence of an action stimulus. These findings support the view that mirror system development depends on associative learning and indicate that this learning is not purely Hebbian. If this is correct, associative learning theory could be used to explain, predict, and intervene in mirror system development.

  9. Optimal Nonlinear Pricing, Bundling Commodities and Contingent Services

    International Nuclear Information System (INIS)

    Podesta, Marion; Poudou, Jean-Christophe

    2008-01-01

    In this paper, we propose to analyze optimal nonlinear pricing when a firm offers in a bundle a commodity and a contingent service. The paper studies a mechanism design where all private information can be captured in a single scalar variable in a monopoly context. We show that to propose the package for commodity and service is less costly for the consumer, the firm has lower consumers' rent than the situation where it sells their good and contingent service under an independent pricing strategy. In fact, the possibility to use price discrimination via the supply of package is dominated by the fact that it is costly for the consumer to sign two contracts. Bundling energy and a contingent service is a profitable strategy for a energetician monopoly practising optimal nonlinear tariff. We show that the rates of the energy and the contingent service depend to the optional character of the contingent service and depend to the degree of complementarity between commodities and services. (authors)

  10. Rearfoot striking runners are more economical than midfoot strikers.

    Science.gov (United States)

    Ogueta-Alday, Ana; Rodríguez-Marroyo, José Antonio; García-López, Juan

    2014-03-01

    This study aimed to analyze the influence of foot strike pattern on running economy and biomechanical characteristics in subelite runners with a similar performance level. Twenty subelite long-distance runners participated and were divided into two groups according to their foot strike pattern: rearfoot (RF, n = 10) and midfoot (MF, n = 10) strikers. Anthropometric characteristics were measured (height, body mass, body mass index, skinfolds, circumferences, and lengths); physiological (VO2max, anaerobic threshold, and running economy) and biomechanical characteristics (contact and flight times, step rate, and step length) were registered during both incremental and submaximal tests on a treadmill. There were no significant intergroup differences in anthropometrics, VO2max, or anaerobic threshold measures. RF strikers were 5.4%, 9.3%, and 5.0% more economical than MF at submaximal speeds (11, 13, and 15 km·h respectively, although the difference was not significant at 15 km·h, P = 0.07). Step rate and step length were not different between groups, but RF showed longer contact time (P Foot strike pattern affected both contact and flight times, which may explain the differences in running economy.

  11. Striking dynamics and kinetic properties of boxing and MMA gloves

    Directory of Open Access Journals (Sweden)

    Benjamin Lee

    2014-08-01

    Full Text Available With the growing popularity of Mixed Martial Arts (MMA as a competitive sport, questions regarding the dynamic response and properties of MMA gloves arise. High-energy impacts from punches are very similar to boxing yet MMA competition requires the use of 4 oz fingerless glove, compared to the larger full enclosure boxing glove. This work assessed the kinetic properties and strike dynamics of MMA gloves and compared findings with traditional boxing gloves. Gloves mounted on a molded fist were impacted repetitively on an instrumental anvil designed for impact, over a 5 hour period resulting in 10,000 continuous and consistent strikes. Kinetic data from impacts were sampled at the beginning of the data collection and subsequently every 30 minutes (every 1,000 strikes. MMA gloves produced 4-5 times greater peak force and 5 times faster load rate compared to the boxing glove. However, MMA gloves also showed signs of material fatigue, with peak force increasing by 35% and rate of loading increasing by 60% over the duration of the test. Boxing glove characteristics did deteriorate but to a lesser extent. In summary, the kinetic properties of MMA glove differed substantially from the boxing glove resulting in impacts characterized by higher peak forces and more rapid development of force. Material properties including stiffness and thickness play a role in the kinetic characteristics upon impact, and can be inferred to alter injury mechanisms of blunt force trauma.

  12. 78 FR 55029 - Approval and Promulgation of Implementation; Texas; Houston: Reasonable Further Progress Plan...

    Science.gov (United States)

    2013-09-09

    ...): Transportation Control Measures and Transportation Control Strategies To Offset Growth in Emissions Due to Growth... progress (RFP) plan and contingency measures, the vehicle miles traveled (VMT) offset analysis, and... and Emission Reductions for RFP E. Contingency Measures F. Vehicle Miles Traveled Offset Analysis G...

  13. Negotiating contingent knowledges in a time of epistemic doubt

    DEFF Research Database (Denmark)

    Phillips, Louise Jane

    How can/should we produce and communicate social scientific knowledge with authority under conditions of epistemic doubt? If all knowledge is contingent and if truth is a discursive effect rather than the final claim about reality - as post-foundationalism suggests - how can we formulate...... and provide support for contingent knowledge-claims? And how can the communication of social scientificknowlege be theorised and practised as the negotiation between social scientific knowledge and other forms of contingent knowledge rather than the one-way transmission of universal, value-free truth......-claims? In the paper, I outline an approach to addressing the final question. The approach is based on a combination of approaches to the production of knowledge developed in post-foundationalist sociology and philosophy of science, approaches to the communication of knowlege developed within communication studies...

  14. Wind Turbine Contingency Control Through Generator De-Rating

    Science.gov (United States)

    Frost, Susan; Goebel, Kai; Balas, Mark

    2013-01-01

    Maximizing turbine up-time and reducing maintenance costs are key technology drivers for wind turbine operators. Components within wind turbines are subject to considerable stresses due to unpredictable environmental conditions resulting from rapidly changing local dynamics. In that context, systems health management has the aim to assess the state-of-health of components within a wind turbine, to estimate remaining life, and to aid in autonomous decision-making to minimize damage to the turbine. Advanced contingency control is one way to enable autonomous decision-making by providing the mechanism to enable safe and efficient turbine operation. The work reported herein explores the integration of condition monitoring of wind turbines with contingency control to balance the trade-offs between maintaining system health and energy capture. The contingency control involves de-rating the generator operating point to achieve reduced loads on the wind turbine. Results are demonstrated using a high fidelity simulator of a utility-scale wind turbine.

  15. Thévenin equivalent based static contingency assessment

    DEFF Research Database (Denmark)

    2015-01-01

    of the determined present state of the power system and determining a first representation of the network based on the determined Thevenin equivalents, determining a modified representation of the network, wherein the modified representation is a representation of the network having at least one contingency......, wherein at least one Thevenin equivalent of at least one voltage controlled node is modified due to the at least one contingency, the modified network representation being determined on the basis of the modified Thevenin equivalents, calculating voltage angles of the modified Thevenin equivalents......, and evaluating the voltage angles to determine whether the network having at least one contingency admit a steady state. Also a method of providing information on a real time static security assessment of a power system is disclosed....

  16. Alternative Approaches to the Analysis of Multidimensional Contingency Tables

    Directory of Open Access Journals (Sweden)

    Iva Pecáková

    2011-12-01

    Full Text Available The practical analyses of interactions between categorical variables in various areas (such as public opinion research or marketing research are often only applications of chi-square tests in two-way contingency tables. However, in many situations it is impossible to use large-sample approximations to sampling distributions when theiradequacy can be in doubt. It is known, that these approximations may be very poor when the contingency table contains very small expected frequencies. However, recent work has shown that these approximations can be very poor when the contingency table contains both small and large expected frequencies. Of course, the rule of thumb of a minimum expected frequency is not met either in the case of sparse table. The article deals with alternative approaches to the data analysis in such cases. It points out other possibilities and shows that thanks to the development of computer technology exact methods previously only difficult usable are available for this purpose.

  17. Strategic cost management, contingent factors and performance in services

    Directory of Open Access Journals (Sweden)

    Odysseas Pavlatos

    2018-06-01

    Full Text Available The purpose of this paper is to investigate the relationship between contextual factors identified from contingency-based research, the extent of the use of strategic cost management (SCM techniques and business performance in services. An empirical survey was conducted on a sample of 88 services in Greece. The analysis of the survey data indicates that the use of strategic cost management techniques in services can be considered quite satisfactory. By drawing on the grounds of contingency theory, five factors were identified as potentially exhibiting an emergent relationship with strategic cost management. The five factors are; (1 Perceived environmental uncertainty, (2 Structure, (3 Organizational life cycle stage, (4 Strategy and (5 Size. The survey revealed that SCM usage is positively affected by these five contingent factors, while SCM usage, in turn, positively affects performance. A significant mediating effect of SCM usage on performance is evident.

  18. Robustness and Contingent History: From Prisoner's Dilemma to Gaia Theory.

    Science.gov (United States)

    Harvey, Inman

    2018-01-01

    In both social systems and ecosystems there is a need to resolve potential conflicts between the interests of individuals and the collective interest of the community. The collective interests need to survive the turbulent dynamics of social and ecological interactions. To see how different systems with different sets of interactions have different degrees of robustness, we need to look at their different contingent histories. We analyze abstract artificial life models of such systems, and note that some prominent examples rely on explicitly ahistorical frameworks; we point out where analyses that ignore a contingent historical context can be fatally flawed. The mathematical foundations of Gaia theory are presented in a form whose very basic and general assumptions point to wide applicability across complex dynamical systems. This highlights surprising connections between robustness and accumulated contingent happenstance, regardless of whether Darwinian evolution is or is not implicated. Real-life studies highlight the role of history, and artificial life studies should do likewise.

  19. The Relevance of IT Service Management Maturity for IT Alignment and Its Strategy and Organization Size Contingencies

    DEFF Research Database (Denmark)

    Winkler, Till J.; Wulf, Jochen; Brenner, Walter

    2014-01-01

    to address whether and in which contingent contexts the institutionalization of ITSM frameworks, understood as collections of IT governance mechanisms, may contribute to IT alignment, a widely recognized prerequisite for superior IT performance. This workshop contribution is based on a cross-sectional survey...... with ITSM experts in which we measure levels of maturity of different ITSM planning and execution processes and focus on the organizations’ IS strategy (innovative versus conservative) as well as organization size as contingency factors hypothesized to moderate the effect of ITSM maturity on IT alignment....... Our findings strengthen the view that ITSM frameworks like ITIL incorporate governance mechanisms that can enhance the effect of the established relational antecedents of IT alignment. In addition, our data particularly provide evidence for the relevance of execution-level ITSM processes and suggest...

  20. Regional transmission subsystem planning

    Energy Technology Data Exchange (ETDEWEB)

    Costa Bortoni, Edson da [Quadrante Softwares Especializados Ltda., Itajuba, MG (Brazil); Bajay, Sergio Valdir; Barros Correia, Paulo de [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica; Santos, Afonso Henriques Moreira; Haddad, Jamil [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1994-12-31

    This work presents an approach for the planning of transmission systems by employing mixed--integer linear programming to obtain a cost and operating characteristics optimized system. The voltage loop equations are written in a modified form, so that, at the end of the analysis, the model behaves as a DC power flow, with the help of the two Kirchhoff`s laws, exempting the need of interaction with an external power flow program for analysis of the line loading. The model considers the occurrence of contingencies, so that the final result is a network robust to the most severe contingencies. This whole technique is adapted to the regional electric power transmission subsystems. (author) 9 refs., 4 figs.