WorldWideScience

Sample records for stations electrical substations

  1. Electric Substations

    Data.gov (United States)

    Department of Homeland Security — Substations. Substations are facilities and equipment that switch, transform, or regulate electric voltage. The Substations feature class includes taps, a location...

  2. Final environmental assessment for vegetation control at VHF stations, microwave stations, electrical substations, and pole yards

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-13

    Southwestern Power Adm. operates very high frequency (VHF) and microwave radio stations, electrical substations, and pole yards for electric power transmission throughout AR, MO, and OK. Vegetation growth at the stations must be suppressed for safety of operation and personnel. Southwestern has been using a combination of mechanical/manual and herbicide control for this purpose; Federally- mandated reductions in staff and budgetary resources require Southwestern to evaluate all potentially efficient methods for vegetation control. Three alternatives were examined: no action, mechanical/manual control, and (proposed) a combination of mechanical/manual and herbicide control. Environmental impacts on air and water quality, wetlands, wildlife, endangered species, archaeological and other resources, farmland, human health, transportation, etc. were evaluated.

  3. Electric power substations engineering

    CERN Document Server

    McDonald, John D

    2012-01-01

    The use of electric power substations in generation, transmission, and distribution remains one of the most challenging and exciting areas of electric power engineering. Recent technological developments have had a tremendous impact on all aspects of substation design and operation. With 80% of its chapters completely revised and two brand-new chapters on energy storage and Smart Grids, Electric Power Substations Engineering, Third Edition provides an extensive updated overview of substations, serving as a reference and guide for both industry and academia. Contributors have written each chapt

  4. Security architecture for substations. Voltage transformation stations and substations; Sicherheitsarchitektur fuer Substations. Umspannwerke und -stationen

    Energy Technology Data Exchange (ETDEWEB)

    Seewald, Maik G. [Cisco Systems GmbH, Halbergmoos (Germany). Bereich Forschung und Entwicklung

    2012-04-30

    Voltage transformation stations and substations are a central component of the electrical power supply. These fulfill key functions at different voltage levels, are highly automated and linked via different communication technologies. Thus they play a central role in the IT security and belong to the critical infrastructure. This is addressed by various standards and guidelines. Therefore, a comprehensive security structure for substations as well as primary and secondary systems are an important criterion for success in the expansion of power supply networks. This is even more important, since the degree of crosslinking will increase as a result of new systems and services. The author of the contribution under consideration depicts the security architecture which was specifically developed for this area by Cisco Systems GmbH (Hallbergmoos, Federal Republic of Germany).

  5. Evaluation of sub-soil geo-electric properties in a proposed power sub-station site at Ebubu, Rivers State, Nigeria

    OpenAIRE

    T.K.S. Abam; S.A. Ngah

    2014-01-01

    Electrical resistivity survey was carried out in a site proposed for the construction and installation of a Power sub-station. The project will involve subsurface installation of cables and other objects that easily conduct electricity. Extant laws including EIA also require knowledge of subsurface distribution of resistivity in construction projects that would involve burial of steel pipes and cables. The imperative of this is emphasized by the location of the project in an area of shallow g...

  6. Electric power substations engineering

    CERN Document Server

    2003-01-01

    This book covers all aspects of substations, from the initial concept to design, automation, operation, and physical and cyber security. Written by members of the Institute of Electrical and Electronic Engineers (IEEE) Power Engineering Society (PES) Substations Committee, each section provides a tutorial and includes references for further reading and study. The authors use photographs and graphics to help the reader understand the material. Exploring the most recent technological developments regarding industry practice and standards, the book provides an extensive overview of substations th

  7. Flow and heat distribution analysis of different transformer sub-stations

    International Nuclear Information System (INIS)

    Hasini, H; Shuaib, N H; Yogendran, S B; Toh, K B

    2013-01-01

    This paper describes CFD investigation on the flow and heat transfer in transformers at different sub-station buildings. The analysis aimed to determine the cooling capability of the existing transformer building employing natural ventilation system to dissipate heat sufficiently when new dry-type transformer operating under full load condition is used. The transformer and building models were developed based on the actual transformer configuration in operation at three different locations in Malaysia. The calculation was carried out on three different types of sub-stations namely stand-alone, attach-to-building and underground. The effect of natural ventilation speed and building volume on the transformer surfaces temperature are also investigated. It was predicted that the existing sub-station configuration is able to dissipate heat produced from the dry type transformer by using its natural ventilation system regardless of the sub-station types. However, the smallest building case shows relatively high surrounding temperature

  8. Using Immersive Virtual Reality for Electrical Substation Training

    Science.gov (United States)

    Tanaka, Eduardo H.; Paludo, Juliana A.; Cordeiro, Carlúcio S.; Domingues, Leonardo R.; Gadbem, Edgar V.; Euflausino, Adriana

    2015-01-01

    Usually, distribution electricians are called upon to solve technical problems found in electrical substations. In this project, we apply problem-based learning to a training program for electricians, with the help of a virtual reality environment that simulates a real substation. Using this virtual substation, users may safely practice maneuvers…

  9. Water Pumping Stations, File name = UTILITIES - PARTIAL Data is incomplete. Contains electric trans lines, electric substations, sewer plants, sewer pumpstations, water plants, water tanks http://www.harfordcountymd.gov/gis/Index.cfm, Published in 2011, 1:1200 (1in=100ft) scale, Harford County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Water Pumping Stations dataset current as of 2011. File name = UTILITIES - PARTIAL Data is incomplete. Contains electric trans lines, electric substations, sewer...

  10. Sewerage Pumping Stations, File name = UTILITIES - PARTIAL Data is incomplete. Contains electric trans lines, electric substations, sewer plants, sewer pumpstations, water plants, water tanks http://www.harfordcountymd.gov/gis/Index.cfm, Published in 2011, 1:600 (1in=50ft) scale, Harford County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Sewerage Pumping Stations dataset current as of 2011. File name = UTILITIES - PARTIAL Data is incomplete. Contains electric trans lines, electric substations, sewer...

  11. Standard IEC 61850 substation automation

    Energy Technology Data Exchange (ETDEWEB)

    Bricchi, A.; Mezzadri, D. [Selta, Tortoreto (Italy)

    2008-07-01

    The International Electrotechnical Commission (IEC) 61850 standard is the reference communication protocol for all electrical substations protection and control systems. It creates models of all the elements and functionalities of an electrical substation, including physical elements such as switches or circuit breakers, as well as protection, control and monitoring functionalities. Network managers need to renew power substation automation and control systems in order to improve the efficiency and quality of services offered by electric utilities. Selta has proposed a new integrated solution for the automation of power substations which is fully compliant with the IEC 61850 norms. The solution involves the integration of control, automation, protection, monitoring and maintenance functions and applies leading edge technology to its systems, particularly for the TERNA network. The system is based on the use of many electronic devices at a power plant, each one with a specialized function, and all interconnected via a Station LAN. This solution, was tested on the TERNA network in Italy, in VHV and HV stations. It was shown to offer many advantages, such as an architecture based on full interoperability between control, monitoring and protection equipment; centralized and distributed automation; a LAN station that allows full interoperability between different bay units and protection relays in order to integrate equipment from various suppliers; the integration of automation systems in existing bay units and protection relays equipped with standard communication buses or with proprietary interfaces; and time synchronization for the entire system through a station GPS reception system. 10 refs., 1 tab., 7 figs.

  12. Static Electricity as Part of Electromagnetic Environment on High-Voltage Electrical Substation

    Directory of Open Access Journals (Sweden)

    M. I. Fursanov

    2012-01-01

    Full Text Available Causes of occurrences electrostatic discharges (ESD on high-voltage electric substation were investigated and dependences values ESD’s on parameters interaction structures, humidity of air were found. Experimental research values ESD’s on high-voltage electric substation and in man-made conditions was fulfilled. Uncertainty measurement’s was taken into consideration by research results analyze. Matching with research of other authors was made. Danger ESD’s for electric devises was established.

  13. Calculation of noise maps around electrical energy substations

    International Nuclear Information System (INIS)

    Diniz, Fabiano B.; Zannin, Paulo H.T.

    2005-01-01

    This work is aimed at studying the noise caused by the transformers found in electrical substations located in calm areas in the city of Curitiba, Brazil. Although the level itself reaching the nearby buildings is not high if compared to other noise sources commonly found in a large city, they produce an annoying noise due to its low frequency tonal components. Two substations and their surroundings have been analyzed and acoustically mapped. The results have shown that some houses receive up to 35 dB(A) near one of the substations, which may led to some discomfort. It has also been noticed that a good planning of a substation, mainly of the firewalls, may help putting the houses under acoustical shadows. (Author)

  14. MONITORING OF ELECTRICAL ENERGY QUALITY ON THE TRACTION SUBSTATION INPUT

    Directory of Open Access Journals (Sweden)

    O.G. Gryb

    2015-12-01

    Full Text Available For the implementation of measures to maintain the quality of the energy industrial enterprises have to spend a significant material and monetary assets. In this regard, significant is the feasibility study of the allocation of such funds and, primarily, the determination of the economic damage arising from low quality of electricity. The reliability of the electricity metering system, relay protection and automation of modern digital substations depends on the quality of electrical energy. At the present time to improve the reliability of the substation operation it is necessary to monitor indicators of quality of electric energy, allowing you to take organizational and technical solutions for their improvement. Monitoring the power quality at the input traction substation has shown that indicators such as the coefficient of the n-th harmonic component of the voltage does not meet the standards GOST 13109-97. The source of higher harmonics is a voltage Converter used on the locomotive. To eliminate higher harmonics in the supply network for traction substations will need to install power filters. Today, the USB-analyzer of power quality «Digital measurement system of power quality» type of CSICE of accuracy class 0.2. Work energy requires reliable and quality electricity supply to consumers. The new model of balancing energy market are bilateral contracts. The main task of this market, it ensure the stable and reliable operation of the unified energy system of Ukraine, that is, transmission and supply of electricity of appropriate quality.

  15. Electric and magnetic field measurements in an outdoor electric power substation

    Energy Technology Data Exchange (ETDEWEB)

    Safigianni, A.S.; Tsompanidou, C.G. [Democritus Univ. Thrace, Xanthi (Greece). Dept. of Electrical and Computer Engineering

    2006-07-01

    With the ever increasing environmental exposure to man-made electromagnetic fields (EMFs), public concern regarding the potential health hazards of exposure to electric and magnetic fields at extremely low frequencies (ELF) has also increased. This paper examined the ELF fields at a 150/20 kV outdoor electric power substation in Xanthi, Greece. Basic data regarding this substation was provided along with previous relevant research studies. The reference levels for safe general public and occupational exposure according to the International Commission on Non-Ionizing Radiation Protection (ICNIRP) was also presented. The instruments used to take the measurements were described and indicative results of the EMFs measurements in the substation were provided. In general, the measured magnetic flux density values were far below the reference level for safe public and occupational exposure. No significant differentiation was noted in these values in relation to body height. However, the levels were found to be in violation in two positions, near the capacitor banks. It was emphasized that these values greatly decreased with distance, and the positions where these high values were measured were not occupied by technicians when the capacitors were under voltage. In addition, it was emphasized that the measured magnetic flux density values were very small in the supervision room, where the supervisor of the substation works and in the ring zone where the public has access. All the measured electric field strength values were below the reference level for safe public and occupational exposure. It was concluded that the measured field values are within recognized guidelines and pose no danger for public or working personnel. 19 refs., 1 tab., 4 figs.

  16. 750V DC substation facility of electric railway for PUTRA, Malaysia; Malaysia PUTRA muke DC750V dentetsuyo chokuryu henden setsubi

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-02-29

    The first subway was put into full service operation in Kuara Lumpur, Malaysia on July 21. This east-west subway of 29km runs from Kelana Jaya through the downtown KLCC famous for the twin tower to Terminal PUTRA including 24 stations. As power facilities for the electric railway, 2 receiving substations and 13 DC substations were provided. The subway transforms voltage from 132kV to 33kV at the receiving substations, and from AC 33kV to DC 750V at the DC substations to supply power to trains. Features of these facilities are as follows. (1) Gas-insulated switchgears (GIS) and silicon oil-filled transformers are adopted from the viewpoint of disaster prevention. (2) Regenerative power from trains is consumed by the regenerative resistance equipment (resistor control using GTO device) installed in the substations. (3) The fourth-rail system is adopted as current collection system of trains. (translated by NEDO)

  17. Characteristic Analysis of DC Electric Railway Systems with Superconducting Power Cables Connecting Power Substations

    Science.gov (United States)

    Ohsaki, H.; Matsushita, N.; Koseki, T.; Tomita, M.

    2014-05-01

    The application of superconducting power cables to DC electric railway systems has been studied. It could leads to an effective use of regenerative brake, improved energy efficiency, effective load sharing among the substations, etc. In this study, an electric circuit model of a DC feeding system is built and numerical simulation is carried out using MATLAB-Simulink software. A modified electric circuit model with an AC power grid connection taken into account is also created to simulate the influence of the grid connection. The analyses have proved that a certain amount of energy can be conserved by introducing superconducting cables, and that electric load distribution and concentration among the substations depend on the substation output voltage distribution.

  18. Characteristic analysis of DC electric railway systems with superconducting power cables connecting power substations

    International Nuclear Information System (INIS)

    Ohsaki, H; Matsushita, N; Koseki, T; Tomita, M

    2014-01-01

    The application of superconducting power cables to DC electric railway systems has been studied. It could leads to an effective use of regenerative brake, improved energy efficiency, effective load sharing among the substations, etc. In this study, an electric circuit model of a DC feeding system is built and numerical simulation is carried out using MATLAB-Simulink software. A modified electric circuit model with an AC power grid connection taken into account is also created to simulate the influence of the grid connection. The analyses have proved that a certain amount of energy can be conserved by introducing superconducting cables, and that electric load distribution and concentration among the substations depend on the substation output voltage distribution.

  19. Optimised compact SF6 switchgear, mobile substations and modules for improved substation economics

    Energy Technology Data Exchange (ETDEWEB)

    Mikes, E.G. [Areva T and D gas insulated substations, Oberetfelder (Switzerland); Montillet, G.F. [Areva T and D, Charleroi, PA (United States)

    2007-07-01

    One of the key elements of the electrical transmission and subdistribution networks in dense industrial areas and cities are gas insulated substations (GIS). More economical and ecological aspects in new designs are increasingly forcing the selection of smaller optimised switchgear. This paper discussed new spring mechanisms, gasket design, monitoring systems, and eco-design. Utilities are looking for new substations, upgrades, refurbishments and more efficient solutions for an extension to the current expanding infrastructure. For temporary installations, mines and some specific industries mobile substations are a great opportunity. The paper discussed several types of designs, including mobile GIS and one platform solutions for small and midsize substations; prefabricated and container solutions; hybrid switchgear modules with integrated control and monitoring functions; and optimization of GIS solutions for different station layouts having combined-functions such as circuit breaker/disconnector units. It was concluded that the search for the ongoing enhancement of the solutions in terms of cost-effectiveness and increased availability by utilities demonstrate that the system's rated voltage level and single-line-diagram configuration and in some cases the geographical position are the critical elements that determine the choice between several alternatives. 13 refs, 16 figs.

  20. Major Refit for CERN's 400 kV Substation

    CERN Multimedia

    2001-01-01

    The 400 kV substation on the Prévessin site brings in the electricity that powers CERN's accelerators and the majority of the Laboratory's installations. It was originally built in the 1970s for the SPS, and is one of only five privately owned 400 kV sub-stations in France. Three of the others belong to the national railway company, SNCF, supplying the Paris-Marseilles TGV line, the other is at the Cadarache research centre near mouth of the Rhone. After nearly thirty years of service, CERN's substation has just undergone a complete overhaul. The new main 18 kV switchboard for the SPS pulsed network. The electricity supply for the original Prévessin substation was from the 400 kV EDF network, delivered through three 90 MW transformers at 18 kV to the SPS pulsed network, With the arrival of LEP, two 110 MW transformers were added to supply the new accelerator. Now, as CERN gears up for the LHC, additional pulsed power capacity is needed to supply the transfer lines carrying protons from...

  1. Electric and magnetic field testing in vicinity of 110/x kV substations

    Directory of Open Access Journals (Sweden)

    Grbić Maja

    2016-01-01

    Full Text Available The levels of non-ionizing radiation (electric and magnetic fields at power frequency, which occur near 110/x kV substations are analyzed in this paper. The results of electric field strength and magnetic flux density measurements in the vicinity of three typical substations of the aforementioned voltage level are shown. With the purpose of estimating the exposure of the population to these fields, the obtained results were compared to the reference maximum levels set for increased sensitivity areas, which amount to 2 kV/m for electric field and 40 μT for magnetic flux density. The objective of the conducted analysis is to reach general conclusions on the levels of electric and magnetic fields, which may occur in the vicinity of the substations mentioned above, and evaluate their compliance with the national regulations on the population protection from non-ionizing radiation.

  2. Electrical substation service-area estimation using Cellular Automata: An initial report

    Energy Technology Data Exchange (ETDEWEB)

    Fenwick, J.W.; Dowell, L.J.

    1998-07-01

    The service areas for electric power substations can be estimated using a Cellular Automata (CA) model. The CA model is a discrete, iterative process whereby substations acquire service area by claiming neighboring cells. The service area expands from a substation until a neighboring substation service area is met or the substation`s total capacity or other constraints are reached. The CA-model output is dependent on the rule set that defines cell interactions. The rule set is based on a hierarchy of quantitative metrics that represent real-world factors such as land use and population density. Together, the metrics determine the rate of cell acquisition and the upper bound for service area size. Assessing the CA-model accuracy requires comparisons to actual service areas. These actual service areas can be extracted from distribution maps. Quantitative assessment of the CA-model accuracy can be accomplished by a number of methods. Some are as simple as finding the percentage of cells predicted correctly, while others assess a penalty based on the distance from an incorrectly predicted cell to its correct service area. This is an initial report of a work in progress.

  3. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Science.gov (United States)

    2010-07-01

    ... LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Fire Prevention and Control Prohibitions/precautions/housekeeping § 56.4130 Electric substations...

  4. Seismic risk evaluation for high voltage air insulated substations

    International Nuclear Information System (INIS)

    Camensig, Carlo; Bresesti, Luca; Clementel, Stefano; Salvetti, Maurizio

    1997-01-01

    This paper describes the results of the analytical and experimental activities performed by ISMES for the evaluation of the structural reliability of electrical substations with respect to seismic events. In the following, the reference station is described along with the methods used to define the site seismic input, the analytical and experimental evaluation of the components' fragility curves and the whole station seismic risk evaluation

  5. ENEL high and medium voltage electrical substations for power supply to urban centers

    International Nuclear Information System (INIS)

    Bargigia, A.; Boatto, C.; Di Mario, A.; Fava, N.; Sciarra, S.; Speziali, R.

    1991-12-01

    Modular high and medium voltage gas insulated electrical substations are being used by ENEL (Italian Electricity Board) to meet the specific needs of urban centers with special design and sizing constraints of a historical/architectural nature. This paper illustrates the key design, construction operation and performance characteristics of these standardized units. The descriptions include brief notes on equipment-transformer interconnection, interchangeability and environmental compatibility. Performance test procedures and results of actual reliability and certification tests on some substations are reported

  6. Substation electromagnetic interference

    International Nuclear Information System (INIS)

    Felic, G.; Shihab, S.

    1997-01-01

    The electric and magnetic transients in high voltage substations were studied. The electric field measurements were carried out in a 66 kV switchyard of a 500/220/66 kV substation in Melbourne, Australia. The measured waveforms make up a database to be used for reference in the testing of substation control and protection equipment. The objective of this study was to characterize the radiated interference caused by the operation of disconnect switches and circuit breakers. Disconnect switch transients can be a serious hazard for substations because the slow moving contacts during opening and closing can result in arcing events of several seconds duration. Circuit breaker transients were considered to be less hazardous. Transient magnetic fields of at least several tens of A/m can occur during the energization of the capacitor bank. Substation electronic equipment should be tested and protected against the coupling of these transients in order to avoid breakdowns. 5 refs., 4 figs

  7. On-rail solution for autonomous inspections in electrical substations

    Science.gov (United States)

    Silva, Bruno P. A.; Ferreira, Rafael A. M.; Gomes, Selson C.; Calado, Flavio A. R.; Andrade, Roberto M.; Porto, Matheus P.

    2018-05-01

    This work presents an alternative solution for autonomous inspections in electrical substations. The autonomous system is a robot that moves on rails, collects infrared and visible images of selected targets, also processes the data and predicts the components lifetime. The robot moves on rails to overcome difficulties found in not paved substations commonly encountered in Brazil. We take advantage of using rails to convey the data by them, minimizing the electromagnetic interference, and at the same time transmitting electrical energy to feed the autonomous system. As part of the quality control process, we compared thermographic inspections made by the robot with inspections made by a trained thermographer using a scientific camera Flir® SC660. The results have shown that the robot achieved satisfactory results, identifying components and measuring temperature accurately. The embodied routine considers the weather changes along the day, providing a standard result of the components thermal response, also gives the uncertainty of temperature measurement, contributing to the quality in the decision making process.

  8. Independent Power Generation in a Modern Electrical Substation Based on Thermoelectric Technology

    Science.gov (United States)

    Li, Z. M.; Zhao, Y. Q.; Liu, W.; Wei, B.; Qiu, M.; Lai, X. K.

    2017-05-01

    Because of many types of electrical equipment with high power in substations, the potentiality of energy conservation is quite large. From this viewpoint, thermoelectric materials may be chosen to produce electrical energy using the waste heat produced in substations. Hence, a thermoelectric generation system which can recycle the waste heat from electric transformers was proposed to improve the energy efficiency and reduce the burden of the oil cooling system. An experimental prototype was fabricated to perform the experiment and to verify the feasibility. The experimental results showed that the output power could achieve 16 W from waste heat of 900 W, and that the power conversion efficiency was approximately 1.8%. Therefore, power generation is feasible by using the waste heat from the transformers based on thermoelectric technology.

  9. Ergonomic analyse of operation work in electric energy transmission substation; Analise ergonomica do trabalho de operacao de subestacoes de transmissao de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Menegon, Nilton Luiz

    1993-04-01

    The activity by the workers in sub-stations which transmits and distributes electric energy is studied within the context of ergonomic, i.e., of its adequateness to the human being characteristics. In the introduction of this book the ideas of ergonomic related to the behaviour of the workers who works which continuous processes in control room are reviewed. The development of the ideas in this field as well as the methodology to be followed in this work are discussed. The technical system involving the activities of the workers in sub-station is presented. These activities are inserted within a broad context of the electric energy sector. An analysis concerning the problems in the ergonomic field which justifies the ergonomic intervention follows the previous study. The work situation is characterized. The formal organization of the work and its physical and cognitive demands are examined. The task is explained in detail. With the analysis of the activities based on the systematic observation of the work performed by the workers, we finish this study. Finely, a diagnosis of the work situation and the recommendations compromised whit the workers health and improvement of the performance is settled. (author) 27 refs., 26 figs.

  10. Electric Company - Medium Voltage Substations

    OpenAIRE

    MacCosham, Spencer

    2014-01-01

    The capstone project goal was to recommend ways to increase sales of our client’s product by a factor of 10. The core of our project included researching and analyzing the client’s “Model III” package-unit-substations. Specifically, the project objectives were two-fold: First, we were to conduct market research and data analysis on package unit substations in North America. We needed to identify sales channels, competitors, potential substitutes, etc. Second, we were to identify market/channe...

  11. Electric Substations, Electric substation locations provided to us from Kansas City Power and Light and City of Gardner only at this time. AIMS is working on getting other providers in area. Data is limited to CUE (Collaborative Utility Exchange) Participants and subcontracto, Published in 2004, Johnson County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Electric Substations dataset current as of 2004. Electric substation locations provided to us from Kansas City Power and Light and City of Gardner only at this time....

  12. National SCADA Test Bed Substation Automation Evaluation Report

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth Barnes; Briam Johnson

    2009-10-01

    Increased awareness of the potential for cyber attack has recently resulted in improved cyber security practices associated with the electrical power grid. However, the level of practical understanding and deployment of cyber security practices has not been evenly applied across all business sectors. Much of the focus has been centered on information technology business centers and control rooms. This report explores the current level of substation automation, communication, and cyber security protection deployed in electrical substations throughout existing utilities in the United States. This report documents the evaluation of substation automation implementation and associated vulnerabilities. This evaluation used research conducted by Newton-Evans Research Company for some of its observations and results. The Newton Evans Report aided in the determination of what is the state of substation automation in North American electric utilities. Idaho National Laboratory cyber security experts aided in the determination of what cyber vulnerabilities may pose a threat to electrical substations. This report includes cyber vulnerabilities as well as recommended mitigations. It also describes specific cyber issues found in typical substation automation configurations within the electric utility industry. The evaluation report was performed over a 5-month period starting in October 2008

  13. Wolf Point Substation, Roosevelt County, Montana

    International Nuclear Information System (INIS)

    1991-05-01

    The Western Area Power Administration (Western), an agency of the United States Department of Energy, is proposing to construct the 115-kV Wolf Point Substation near Wolf Point in Roosevelt County, Montana (Figure 1). As part of the construction project, Western's existing Wolf Point Substation would be taken out of service. The existing 115-kV Wolf Point Substation is located approximately 3 miles west of Wolf Point, Montana (Figure 2). The substation was constructed in 1949. The existing Wolf Point Substation serves as a ''Switching Station'' for the 115-kV transmission in the region. The need for substation improvements is based on operational and reliability issues. For this environmental assessment (EA), the environmental review of the proposed project took into account the removal of the old Wolf Point Substation, rerouting of the five Western lines and four lines from the Cooperatives and Montana-Dakota Utilities Company, and the new road into the proposed substation. Reference to the new proposed Wolf Point Substation in the EA includes these facilities as well as the old substation site. The environmental review looked at the impacts to all resource areas in the Wolf Point area. 7 refs., 6 figs

  14. HVS effect in electric-power substations

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, F F

    1973-01-01

    A syndrome is described which the author calls the ''HVS effect'' (high-voltage substation) and affects persons working at substations where very high-voltage current is transformed and which disappears shortly after the end of the exposure. It is characterized by a feeling of tightness and oppression affecting the head, laxity and fatigue in the upper extremities and persistent insomnia; electroencephalograms show signs of cerebral pain. (Cis Abstr.)

  15. HVS effect in electric-power substations

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, F.F.

    1973-01-01

    A syndrome is described which the author calls the ''HVS effect'' (high-voltage substation) and affects persons working at substations where very high-voltage current is transformed and which disappears shortly after the end of the exposure. It is characterized by a feeling of tightness and oppression affecting the head, laxity and fatigue in the upper extremities and persistent insomnia; electroencephalograms show signs of cerebral pain. (Cis Abstr.)

  16. Noise impact caused by electrical energy substations in the city of Curitiba, Brazil

    International Nuclear Information System (INIS)

    Diniz, F.B.; Zannin, P.H.T.

    2004-01-01

    This survey is intended to characterize the noise impact due to electrical energy substations in the city of Curitiba over the population living in their vicinity. This impact has been studied with the aid of a computational tool capable of mapping the acoustical field of substations and their vicinity. Several factors have been considered in this survey: (1) sound power of the transformers; (2) vehicle flow on the surrounding roads; (3) positioning of the firewalls, buildings and walls; and (4) terrain topography. Four substations have been analyzed, and an acoustical map has been traced for each of them. With these maps it was possible to visualize what was the incident noise level on the building facades. The predicted noise levels have been compared to the environmental legislation of the noise emissions in effect in the city

  17. Ashland Area Support Substation Project

    International Nuclear Information System (INIS)

    1992-06-01

    The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power ampersand Light Company's (PP ampersand L) 115-kilovolt (kV) transmission lines and through PP ampersand L's Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP ampersand L to allow transfer of three megawatts (MW's) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP ampersand L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them

  18. Canby Area Service Project substation and associated transmission line

    International Nuclear Information System (INIS)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ''environmental impact statement'' is not required

  19. Environmental impact of high voltage substations

    International Nuclear Information System (INIS)

    Geambasu, C.; Popadiuc, S.; Drobota, C.; Marza, F.

    2004-01-01

    The first Romanian methodology for simultaneous environmental and human risk evaluation in case of HV installations within substations pertaining to nuclear power stations, based on EU regulation is now applicable in Cernavoda substation. High voltage substations are zones where the environmental impact is focused on electromagnetic field that's causes particular effects in living tissues (human being included). That is the reason why is necessary to identify the potential risk sources, the asses including the way to correct them and to dissimulate the results to the staff and the operational personal.(author)

  20. Project FOOTPRINT: Substation modeling and simulations for E1 pulses

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Scott D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Larson, D. J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kirkendall, B. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-11-06

    This report includes a presentation with an: Introduction to CW coupling; Introduction to single-pulse coupling; Description of E1 waveforms; Structures in a substation yard --articulated (as part of the substation's defined electrical functionality)--unarticulated (not as part of the substation's defined electrical functionality); Coupling --electrical coupling (capacitive coupling) --magnetic coupling (inductive coupling); Connectivity to long-line transmission lines; Control infrastructure; Summary; and References.

  1. Ocean Wave Energy: Underwater Substation System for Wave Energy Converters

    International Nuclear Information System (INIS)

    Rahm, Magnus

    2010-01-01

    This thesis deals with a system for operation of directly driven offshore wave energy converters. The work that has been carried out includes laboratory testing of a permanent magnet linear generator, wave energy converter mechanical design and offshore testing, and finally design, implementation, and offshore testing of an underwater collector substation. Long-term testing of a single point absorber, which was installed in March 2006, has been performed in real ocean waves in linear and in non-linear damping mode. The two different damping modes were realized by, first, a resistive load, and second, a rectifier with voltage smoothing capacitors and a resistive load in the DC-link. The loads are placed on land about 2 km east of the Lysekil wave energy research site, where the offshore experiments have been conducted. In the spring of 2009, another two wave energy converter prototypes were installed. Records of array operation were taken with two and three devices in the array. With two units, non-linear damping was used, and with three units, linear damping was employed. The point absorbers in the array are connected to the underwater substation, which is based on a 3 m3 pressure vessel standing on the seabed. In the substation, rectification of the frequency and amplitude modulated voltages from the linear generators is made. The DC voltage is smoothened by capacitors and inverted to 50 Hz electrical frequency, transformed and finally transmitted to the on-shore measuring station. Results show that the absorption is heavily dependent on the damping. It has also been shown that by increasing the damping, the standard deviation of electrical power can be reduced. The standard deviation of electrical power is reduced by array operation compared to single unit operation. Ongoing and future work include the construction and installation of a second underwater substation, which will connect the first substation and seven new WECs

  2. Workers' exposure to electric fields during the task 'maintenance of an operating device of circuit breaker from a service platform' at 110-kV substations.

    Science.gov (United States)

    Korpinen, Leena; Pääkkönen, Rauno

    2018-02-26

    The objective of the study was to investigate occupational exposure to electric fields during the task 'maintenance of an operating device of circuit breaker from a service platform' at 110-kV substations. The aim was also to compare the results to Directive 2013/35/EU. At 16 substations, 255 electric field measurements were performed. The highest mean value of the electric fields was 9.6 kV⋅m -1 . At 63% of substations the maximum values were over 10.0 kV⋅m -1 , and at 31% of the substations the 75th percentiles were over 10.0 kV⋅m -1 , which is the low action level (AL) according to Directive 2013/35/EU. All measured values were below the high AL (20.0 kV⋅m -1 ). In the future, it is important to take into account that the measurements were only taken at Finnish 110-kV substations; therefore, it is not possible to generalize these results to other countries and different types of substations.

  3. Type B investigation of electrical fault in 351 Substation, December 4, 1994

    International Nuclear Information System (INIS)

    Debban, H.L.; Shearer, C.A.; Boger, R.M.; McDonald, G.P.; Eyre, L.E.; Dell, L.D.; Kelly, D.S.

    1995-02-01

    On December 4, 1994, at 2132:10 hours, an electrical failure of a cable-tapping splice resulted in a fire in the 300 Area of the DOE Hanford Site. The fire occurred in the yard of Substation 351 in electrical Vault R122V, where the cable-tapping splice was located. The fire incinerated all cables passing to and through the vault causing them to fail. The failure of the cables resulted in a power outage to twenty customers in the 300 Area. The vault was electrically isolated, and power was restored to the electrical distribution system at 2311 hours. This report contains the accident scenario, accident analysis, direct cause and root and contributing causes

  4. Type B investigation of electrical fault in 351 Substation, December 4, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Debban, H.L.; Shearer, C.A.; Boger, R.M.; McDonald, G.P. [ICF Kaiser Hanford Co., Richland, WA (United States); Eyre, L.E.; Dell, L.D.; Kelly, D.S. [Westinghouse Hanford Co., Richland, WA (United States)

    1995-02-01

    On December 4, 1994, at 2132:10 hours, an electrical failure of a cable-tapping splice resulted in a fire in the 300 Area of the DOE Hanford Site. The fire occurred in the yard of Substation 351 in electrical Vault R122V, where the cable-tapping splice was located. The fire incinerated all cables passing to and through the vault causing them to fail. The failure of the cables resulted in a power outage to twenty customers in the 300 Area. The vault was electrically isolated, and power was restored to the electrical distribution system at 2311 hours. This report contains the accident scenario, accident analysis, direct cause and root and contributing causes.

  5. Automation of substation design

    Energy Technology Data Exchange (ETDEWEB)

    Milks, D. [Autodesk Inc., San Rafael, CA (United States); Scullion, T. [AutomationForce, Burlington, ON (Canada)

    2010-07-01

    Smart libraries and substation design tools are now being used by electric utilities to simplify and optimize the design of electrical control systems. A rules-based design and database approach was used to determine the placement of connections and for designing schematics, panel layouts wiring diagrams and cable schedules. Substation design solutions can reduce labour resources and field errors. Methods of synthesizing technologies in a database-centric architecture were discussed along with methods of selecting and adopting appropriate design technologies and methods for gaining efficiencies and managing change within organizations. The study demonstrated that the successful adoption of new technology requires a clear understanding of business objectives, technology requirements, and management support. 2 refs., 5 figs.

  6. Major Refit for CERN's 400 kV Substation (Part of the new control and protection system for the 18 kV side)

    CERN Document Server

    2001-01-01

    The 400 kV substation on the Prévessin site brings in the electricity that powers CERN's accelerators and the majority of the Laboratory's installations. It was originally built in the 1970s for the SPS, and is one of only five privately owned 400 kV sub-stations in France. Three of the others belong to the national railway company, SNCF, supplying the Paris-Marseilles TGV line, the other is at the Cadarache research centre near mouth of the Rhone. After nearly thirty years of service, CERN's substation has just undergone a complete overhaul.

  7. Measurement of the Magnetic Fields from High-Voltage (230 kV Substations in Tehran and Assessment of Their Effects

    Directory of Open Access Journals (Sweden)

    Mahdieh Sharifi Fard

    2010-06-01

    Full Text Available Introduction: Recent industrial developments in human societies have caused rapid advancements in technologies of production and distribution of electricity, which in turn result in enhancement of power networks and utilization of high voltages. These networks and the high voltages in transfer lines cause the exposure to electric and magnetic fields. In this study, the situation regarding the magnetic fields from high-voltage (230 kV substations in Tehran was investigated. Material and Methods: In this study, 8 high-voltage (230 kV substations were selected (Shous, Shahid Firouzi, Ozgol, Kan, Tehranpars, Azadegan, Ghorkhane and Besat substations. The premises of each substation was divided into some stations and measurements were done in each one. Measurements were done according to the IEEE std 644-1994 Standard in a way that the device, specifically its probe, was kept at a height of 1 meter above the ground surface. Then, we tried to examine the probable effects of exposure to magnetic fields through the Essex questionnaire, with Cronbach coefficient of 94%, completed by the employees of the substations. These questionnaires were completed by substation operators as an exposed group (36 persons and the employees of the office section of the Tehran regional electric company as a witness group (32 persons. Results: The measured density in none of the stations exceeded the standard limits of the International Commission on Non-Ionizing Radiation Protection. With regard to the questionnaire results about mental and neurological, cardiac and respiratory, and gastrointestinal and auditory disorders, we observed significant differences between witness and exposed groups, however, regarding skin allergies, there was no significant difference. Conclusion: Among all control rooms, the highest measured magnetic field was 6.9 mG in the Ozgol Substation Control Room and the lowest was 2 mG in the post of Shahid Firouzi. The control room of Ozgol

  8. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  9. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  10. Earthquake evaluation of a substation network

    International Nuclear Information System (INIS)

    Matsuda, E.N.; Savage, W.U.; Williams, K.K.; Laguens, G.C.

    1991-01-01

    The impact of the occurrence of a large, damaging earthquake on a regional electric power system is a function of the geographical distribution of strong shaking, the vulnerability of various types of electric equipment located within the affected region, and operational resources available to maintain or restore electric system functionality. Experience from numerous worldwide earthquake occurrences has shown that seismic damage to high-voltage substation equipment is typically the reason for post-earthquake loss of electric service. In this paper, the authors develop and apply a methodology to analyze earthquake impacts on Pacific Gas and Electric Company's (PG and E's) high-voltage electric substation network in central and northern California. The authors' objectives are to identify and prioritize ways to reduce the potential impact of future earthquakes on our electric system, refine PG and E's earthquake preparedness and response plans to be more realistic, and optimize seismic criteria for future equipment purchases for the electric system

  11. Insulation coordination workstation for AC and DC substations

    International Nuclear Information System (INIS)

    Booth, R.R.; Hileman, A.R.

    1990-01-01

    The Insulation Coordination Workstation was designed to aid the substation design engineer in the insulation coordination process. The workstation utilizes state of the art computer technology to present a set of tools necessary for substation insulation coordination, and to support the decision making process for all aspects of insulation coordination. The workstation is currently being developed for personal computers supporting OS/2 Presentation Manager. Modern Computer-Aided Software Engineering (CASE) technology was utilized to create an easily expandable framework which currently consists of four modules, each accessing a central application database. The heart of the workstation is a library of user-friendly application programs for the calculation of important voltage stresses used for the evaluation of insulation coordination. The Oneline Diagram is a graphic interface for data entry into the EPRI distributed EMTP program, which allows the creation of complex systems on the CRT screen using simple mouse clicks and keyboard entries. Station shielding is graphically represented in the Geographic Viewport using a three-dimensional substation model, and the interactive plotting package allows plotting of EPRI EMTP output results on the CRT screen, printer, or pen plotter. The Insulation Coordination Workstation was designed by Advanced Systems Technology (AST), a division of ABB Power Systems, Inc., and sponsored by the Electric Power Research Institute under RP 2323-5, AC/DC Insulation Coordination Workstation

  12. Reliability 'H' scheme of HV/MV substations

    Directory of Open Access Journals (Sweden)

    Perić Dragoslav M.

    2015-01-01

    Full Text Available Substations (HV/MV connect transmission and distribution systems with consumers of electric energy. The selective search method was used for calculation of substation reliability, where all arrangement elements were grouped into blocks. Subject of the analysis was H-arrangements comprising air-insulated switchgears on the high voltage side of HV/MV substations with different number of feeder and transformer bays and diverse scope of the installed switching equipment. Failure rate and duration were used as main HV/MV substation equipment reliability indices. A large number of arrangements were classified into groups, and within a group the arrangements were ranked with the use of multiple criteria. It is shown that the reliability of the electricity transit depends on the equipment of field for the transit of electricity, which favors poorly equipped field. On the other hand, the reliability of transformation of the full power depends mostly on the equipment in coupling field. It is essential that in the coupling field, there are at least two disconnectors. Installation of the switch in the coupling field is meaningful only with appropriate protection, because it further improves reliability. Conclusions are drawn for phased construction and expansion of the single pole diagram with an additional field for the transmission line.

  13. Energy saving in the operation of industrial electrical substations. Part I. Studies

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Jimenez, Juan J; Zerquera Izquierdo, Mariano D; Beltran Leon, Jose S; Garcia Martinez, Juan M; Alvarez Urena, Maria V; Meza Diaz, Guillermo [Universidad de Guadalajara (Mexico)]. E-mails: cheosj@yahoo.com; mdzi@hotmail.com; beltran5601@yahoo.com.mx; jmargarmtz@yahoo.com; victory_alvarez@telmexmail.com; depmec@cucei.udg.mx

    2013-03-15

    The main objective of this work is to offer a methodology for the operation of substations composed by two or more transformers that feed loads of first category. Understand by loads of first category those in that the interruption of the electric supply may cause the loss of human life. The core of this operation shows that in substations with several transformers, the number of transformers connected at a given moment should be one that avoids losses. [Spanish] El objetivo principal de este trabajo es ofrecer una metodologia para la operacion de subestaciones compuestas por dos o mas transformadores que alimentan cargas de primera categoria. Entendiendose por cargas de primera categoria, aquellas en que la interrupcion del suministro electrico puede causar la perdida de vidas humanas. El nucleo de esta operacion muestra que en las subestaciones con varios transformadores, el numero de transformadores conectados, en un momento dado, debe ser aquel que evite perdidas.

  14. Methodology for evaluating the grounding system in electrical substations; Metodologia para la evaluacion del sistema de puesta a tierra en subestaciones electricas

    Energy Technology Data Exchange (ETDEWEB)

    Torrelles Rivas, L.F [Universidad Nacional Experimental Politecnica: Antonio Jose de Sucre (UNEXPO), Guayana, Bolivar (Venezuela)]. E-mail: torrellesluis@gmail.com; Alvarez, P. [Petroleos de Venezuela S.A (PDVSA), Maturin, Monagas (Venezuela)]. E-mail: alvarezph@pdvsa.com

    2013-03-15

    The present work proposes a methodology for evaluating grounding systems in electrical substations from medium and high voltage, in order to diagnose the state of the elements of the grounding system and the corresponding electrical variables. The assessment methodology developed includes a visual inspection phase to the elements of the substation. Then, by performing measurements and data analysis, the electrical continuity between the components of the substation and the mesh ground is verified, the soil resistivity and resistance of the mesh. Also included in the methodology the calculation of the step and touch voltage of the substation, based on the criteria of the International IEEE standards. We study the case of the 115 kV Pirital Substation belonging to PDVSA Oriente Transmission Network. [Spanish] En el presente trabajo se plantea una metodologia para la evaluacion de sistemas de puesta a tierra en subestaciones electricas de media y alta tension, con la finalidad de diagnosticar el estado de los elementos que conforman dicho sistema y las variables electricas correspondientes. La metodologia de evaluacion desarrollada incluye una fase de inspeccion visual de los elementos que conforman la subestacion. Luego, mediante la ejecucion de mediciones y analisis de datos, se verifica la continuidad electrica entre los componentes de la subestacion y la malla de puesta a tierra, la resistividad del suelo y resistencia de la malla. Se incluye tambien en la metodologia el calculo de las tensiones de paso y de toque de la subestacion, segun lo fundamentado en los criterios de los estandares Internacionales IEEE. Se estudia el caso de la Subestacion Pirital 115 kV perteneciente a la Red de Transmision de PDVSA Oriente.

  15. PUREX new substation ATR

    International Nuclear Information System (INIS)

    Nelson, D.E.

    1997-01-01

    This document is the acceptance test report (ATR) for the New PUREX Main and Minisubstations. It covers the factory and vendor acceptance and commissioning test reports. Reports are presented for the Main 5 kV substation building, the building fire system, switchgear, and vacuum breaker; the minisubstation control building and switch gear; commissioning test; electrical system and loads inspection; electrical utilities transformer and cable; and relay setting changes based on operational experience

  16. LIFE MANAGEMENT OF ASSET FROM HIGH VOLTAGE SUBSTATION

    Directory of Open Access Journals (Sweden)

    Sorina COSTINAŞ

    2010-11-01

    Full Text Available Companies have to reinvent continuously their business model. Maintenance can play a key role in the long-term profitability of a company. In Romania, especially since the liberalization of the energy market, the electrical companies are forced to identify and coordinate a lot of processes and to promote competitivity. It is necessary to work safety and be environmentally responsible in order to achieve electrical substations obiectives. In this paper will be presented maintenance strategy (replacement, upgrade or repair and informational aspects of decisional process (technical, financial, social politic, legal and risk aspects. Proposed methodology regarding the maintenance of electrical substation will be focused in how to improve the decisions for improving asset maintenance performance through ISO 9001/14001.

  17. Study on Noise Prediction Model and Control Schemes for Substation

    Science.gov (United States)

    Gao, Yang; Liu, Songtao

    2014-01-01

    With the government's emphasis on environmental issues of power transmission and transformation project, noise pollution has become a prominent problem now. The noise from the working transformer, reactor, and other electrical equipment in the substation will bring negative effect to the ambient environment. This paper focuses on using acoustic software for the simulation and calculation method to control substation noise. According to the characteristics of the substation noise and the techniques of noise reduction, a substation's acoustic field model was established with the SoundPLAN software to predict the scope of substation noise. On this basis, 4 reasonable noise control schemes were advanced to provide some helpful references for noise control during the new substation's design and construction process. And the feasibility and application effect of these control schemes can be verified by using the method of simulation modeling. The simulation results show that the substation always has the problem of excessive noise at boundary under the conventional measures. The excess noise can be efficiently reduced by taking the corresponding noise reduction methods. PMID:24672356

  18. Radio interference and transient field from gas-insulated substations

    International Nuclear Information System (INIS)

    Harvey, S.M.; Wong, P.S.; Balma, P.M.

    1995-01-01

    Gas-insulated substations (GIS), owing to their compact nature, offer an attractive alternative to conventional substations in areas where space is limited, such as in urban areas. Consequently, it is important to address the issue of environmental conditions within the substation and in the surrounding areas. This paper reports the result of radio interference (RI) and transient field measurements at two GIS in Ontario, Canada. For comparison with RI levels taken at the GIS, RI levels outside two hospitals in the Toronto area were also measured. The transient field study covers electromagnetic interference (EMI) levels generated during switching operations, and includes measurements inside and outside the GIS. Measurements show that RI levels from the GIS were either below background levels, or contributed little to the background. RI levels outside the GIS and the hospitals were similar. Peak transient field values up to 580 V/m were measured inside the station building, and dropped to background values of 10 V/m at about 120 m from the station. The transient field (E) dropped off at a rate of 3/2 power with distance (d) from the air-insulated 115 kV bus, i.e. E ∝ d -1.5

  19. Seismic response and rehabilitation of critical substation equipment

    Energy Technology Data Exchange (ETDEWEB)

    Saadeghvaziri, M.A.; Allaverdi, N.H. [New Jersey Inst. of Technology, Newark, NJ (United States); Ashrafi, A. [Columbia Univ., New York, NY (United States); Ersoy, S. [Greenman-Pedersen Inc., Babylon, NY (United States)

    2004-07-01

    Substations are one of the most important components of an electrical power system. They provide protection to transmission and distribution lines and transfer power between different voltage levels. Transformers and bushings within the substation are vulnerable to earthquake ground motion. It is extremely important that electric power systems remain functional following seismic damage. This study assessed the seismic response of critical substation equipment and described advanced technologies for rehabilitation measures such as the Friction Pendulum System (FPS). It presents the results of an extensive finite element analysis on response of transformers and bushings. The objective was to determine the seismic behaviour of transformers and bushings during an earthquake and to determine the probability of different failure modes. The response of an FPS isolated transformer to different earthquakes was also examined along with FPS radii, ground motion intensity and vertical excitations. A finite element model was developed for FPS. The study showed that seismic isolation is a viable mitigation strategy, but a modest increase in slack must be provided. 15 refs., 1 tab., 12 figs.

  20. Simulator for training operators of electric substation: an approach via RBC-Paraconsistent; Simulador para treinamento de operadores de subestacao eletrica: um enfoque via RBC-paraconsistente

    Energy Technology Data Exchange (ETDEWEB)

    Lambert-Torres, G.; Martins, H.G.; Coutinho, M.P.; Goulart, J.D.C.; Soares, F.M.A. [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Dept. de Engenharia Eletrica], Emails: germanoltorres@gmail.com, helgagonzaga@gmail.com, maurilio.coutinho@gmail.com, janaina157@yahoo.com.br, francis.azevedo@gmail.com

    2009-07-01

    This article presents a combination of two techniques applied artificial intelligence to solve problems to Restoration of an Electric Substation: Casebased Reasoning - CBR and the Four Values Annotated Paraconsistent Logic - 4vAPL. The process occurs in the connection functions of belief, disbelief, specialty and temporality to LPA4v in the retrieval of cases to determine process diagnostic of an RBC. The field of CBR is applied in a recovery of an electric substation. The LPA4v is the support applied in problems that have inconsistent information, partials and undefined. Thus this study is closer of the real situations.

  1. Occupational exposure to electric and magnetic fields during work tasks at 110 kV substations in the Tampere region.

    Science.gov (United States)

    Korpinen, Leena H; Pääkkönen, Rauno J

    2010-04-01

    The occupational exposure to electric and magnetic fields during various work tasks at seven 110 kV substations in Finland's Tampere region was studied. The aim was to investigate if the action values (10 kV/m for the E-field and 500 microT for the B-field) of the EU Directive 2004/40/EC were exceeded. Electric and magnetic fields were measured during the following work tasks: (1) walking or operating devices on the ground; (2) working from a service platform; (3) working around the power transformer on the ground or using a ladder; and (4) changing a bulb from a man hoist. In work task 2 "working from a service platform" the measured electric field (maximum value 16.6 kV/m) exceeded 10 kV/m in three cases. In the future it is important to study if the limit value (10 mA/m(2)) of Directive 2004/40/EC is exceeded at 110 kV substations. The occupational 500 microT action value of the magnetic flux density field (B-field) was not exceeded in any working situation.

  2. Touch and step potential analysis at 23.9kV to 4.16kV & 13.8kV to 4.16kV distribution substations with pad-mounted transformers, floating grounds, and other exposed ungrounded metal bodies using WinIGS

    Science.gov (United States)

    Guzman, David G.

    An electrical substation is composed of various subsystems that allow for the effective and safe operation of the power grid. One of the subsystems integrating a conventional substation is defined as the ground grid system. This system allows for the effective operation of the power grid and all the electrical equipment connected to it by providing a ground potential reference, commonly known as the system ground. In addition, the ground grid system provides safety to the workers and the public transiting inside or living nearby a substation by reducing the step and touch potential (or voltage) levels present during a system fault. In today's utility industry practices there is an increasing trend for using pad-mounted electrical equipment for substation applications in an effort to construct new or upgrade existing electrical facilities inside limited property spaces. This thesis work presents an analysis for the effects of touch and step voltages at existing distribution substations where 23.9kV to 4.16kV & 13.8kV to 4.16kV pad-mounted transformers and other pad-mounted switchgear was installed to replace the traditional station class equipment. Moreover, this study will expose modeling techniques employed to define and determine the effects of floating grounds and other exposed metal bodies inside or surrounding these substations using WinIGS; this is in an effort to determine any risks of electric shock associated with this type of installations. The results presented in this work are intended to verify the requirements for the ground grid analysis and design for 4.16kV distribution substations with pad-mounted equipment in order to prevent dangerous step and touch voltage levels appearing at these sites during system faults; and ultimately prevent exposing individuals to the risk of an electric shock.

  3. Design of online monitoring and forecasting system for electrical equipment temperature of prefabricated substation based on WSN

    Science.gov (United States)

    Qi, Weiran; Miao, Hongxia; Miao, Xuejiao; Xiao, Xuanxuan; Yan, Kuo

    2016-10-01

    In order to ensure the safe and stable operation of the prefabricated substations, temperature sensing subsystem, temperature remote monitoring and management subsystem, forecast subsystem are designed in the paper. Wireless temperature sensing subsystem which consists of temperature sensor and MCU sends the electrical equipment temperature to the remote monitoring center by wireless sensor network. Remote monitoring center can realize the remote monitoring and prediction by monitoring and management subsystem and forecast subsystem. Real-time monitoring of power equipment temperature, history inquiry database, user management, password settings, etc., were achieved by monitoring and management subsystem. In temperature forecast subsystem, firstly, the chaos of the temperature data was verified and phase space is reconstructed. Then Support Vector Machine - Particle Swarm Optimization (SVM-PSO) was used to predict the temperature of the power equipment in prefabricated substations. The simulation results found that compared with the traditional methods SVM-PSO has higher prediction accuracy.

  4. Automated system for load flow prediction in power substations using artificial neural networks

    Directory of Open Access Journals (Sweden)

    Arlys Michel Lastre Aleaga

    2015-09-01

    Full Text Available The load flow is of great importance in assisting the process of decision making and planning of generation, distribution and transmission of electricity. Ignorance of the values in this indicator, as well as their inappropriate prediction, difficult decision making and efficiency of the electricity service, and can cause undesirable situations such as; the on demand, overheating of the components that make up a substation, and incorrect planning processes electricity generation and distribution. Given the need for prediction of flow of electric charge of the substations in Ecuador this research proposes the concept for the development of an automated prediction system employing the use of Artificial Neural Networks.

  5. Substation design improvement with a probabilistic reliability approach using the TOPASE program

    Energy Technology Data Exchange (ETDEWEB)

    Bulot, M.; Heroin, G.; Bergerot, J-L.; Le Du, M. [Electricite de France (France)

    1997-12-31

    TOPASE, (the French acronym for Probabilistic Tools and Data Processing for the Analysis of Electric Systems), developed by Electricite de France (EDF) to perform reliability studies on transmission substations, was described. TOPASE serves a dual objective of assisting in the automation of HV substation studies, as well as enabling electrical systems experts who are not necessarily specialists in reliability studies to perform such studies. The program is capable of quantifying the occurrence rate of undesirable events and of identifying critical equipment and the main incident scenarios. The program can be used to improve an existing substation, to choose an HV structure during the design stage, or to choose a system of protective devices. Data collected during 1996 and 1997 will be analyzed to identify useful experiences and to validate the basic concepts of the program. 4 figs.

  6. Man-entry grid and power substations in Germany; Begehbare Netz- und Uebergabestationen in Deutschland

    Energy Technology Data Exchange (ETDEWEB)

    Primus, Illo-Frank

    2010-11-15

    Since the first publication of an electrotechnical standard for factory-assembled stations in 1997, grid and power substations in Germany as a rule are not constructed on site - with some exceptions, e.g. large-scale switching stations - but as prefabricated, factory-assembled concrete structures. There are two types of stations depending on the producer.

  7. A Comparative Study of Electric Load Curve Changes in an Urban Low-Voltage Substation in Spain during the Economic Crisis (2008–2013)

    Science.gov (United States)

    Lara-Santillán, Pedro M.; Mendoza-Villena, Montserrat; Fernández-Jiménez, L. Alfredo; Mañana-Canteli, Mario

    2014-01-01

    This paper presents a comparative study of the electricity consumption (EC) in an urban low-voltage substation before and during the economic crisis (2008–2013). This low-voltage substation supplies electric power to near 400 users. The EC was measured for an 11-year period (2002–2012) with a sampling time of 1 minute. The study described in the paper consists of detecting the changes produced in the load curves of this substation along the time due to changes in the behaviour of consumers. The EC was compared using representative curves per time period (precrisis and crisis). These representative curves were obtained after a computational process, which was based on a search for days with similar curves to the curve of a determined (base) date. This similitude was assessed by the proximity on the calendar, day of the week, daylight time, and outdoor temperature. The last selection parameter was the error between the nearest neighbour curves and the base date curve. The obtained representative curves were linearized to determine changes in their structure (maximum and minimum consumption values, duration of the daily time slot, etc.). The results primarily indicate an increase in the EC in the night slot during the summer months in the crisis period. PMID:24895677

  8. A Comparative Study of Electric Load Curve Changes in an Urban Low-Voltage Substation in Spain during the Economic Crisis (2008–2013

    Directory of Open Access Journals (Sweden)

    Pedro M. Lara-Santillán

    2014-01-01

    Full Text Available This paper presents a comparative study of the electricity consumption (EC in an urban low-voltage substation before and during the economic crisis (2008–2013. This low-voltage substation supplies electric power to near 400 users. The EC was measured for an 11-year period (2002–2012 with a sampling time of 1 minute. The study described in the paper consists of detecting the changes produced in the load curves of this substation along the time due to changes in the behaviour of consumers. The EC was compared using representative curves per time period (precrisis and crisis. These representative curves were obtained after a computational process, which was based on a search for days with similar curves to the curve of a determined (base date. This similitude was assessed by the proximity on the calendar, day of the week, daylight time, and outdoor temperature. The last selection parameter was the error between the nearest neighbour curves and the base date curve. The obtained representative curves were linearized to determine changes in their structure (maximum and minimum consumption values, duration of the daily time slot, etc.. The results primarily indicate an increase in the EC in the night slot during the summer months in the crisis period.

  9. 29 CFR 1926.957 - Construction in energized substations.

    Science.gov (United States)

    2010-07-01

    ... Distribution § 1926.957 Construction in energized substations. (a) Work near energized equipment facilities. (1... lines. When it is necessary to deenergize equipment or lines for protection of employees, the... large electrical equipment, transformers, or breakers. (f) Storage. The storage requirements of § 1926...

  10. Police Stations, City of Wichita Police Department substation locations. Cover is derived from Emergency Facilities (scEfac) cover. Used for Public Safety map rolls. Primary attributes include station number, address, mailing city, type, and name., Published in 2008, 1:1200 (1in=100ft) scale, Sedgwick County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Police Stations dataset current as of 2008. City of Wichita Police Department substation locations. Cover is derived from Emergency Facilities (scEfac) cover. Used...

  11. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  12. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    International Nuclear Information System (INIS)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park

  13. Predictive Maintenance of Power Substation Equipment by Infrared Thermography Using a Machine-Learning Approach

    Directory of Open Access Journals (Sweden)

    Irfan Ullah

    2017-12-01

    Full Text Available A variety of reasons, specifically contact issues, irregular loads, cracks in insulation, defective relays, terminal junctions and other similar issues, increase the internal temperature of electrical instruments. This results in unexpected disturbances and potential damage to power equipment. Therefore, the initial prevention measures of thermal anomalies in electrical tools are essential to prevent power-equipment failure. In this article, we address this initial prevention mechanism for power substations using a computer-vision approach by taking advantage of infrared thermal images. The thermal images are taken through infrared cameras without disturbing the working operations of power substations. Thus, this article augments the non-destructive approach to defect analysis in electrical power equipment using computer vision and machine learning. We use a total of 150 thermal pictures of different electrical equipment in 10 different substations in operating conditions, using 300 different hotspots. Our approach uses multi-layered perceptron (MLP to classify the thermal conditions of components of power substations into “defect” and “non-defect” classes. A total of eleven features, which are first-order and second-order statistical features, are calculated from the thermal sample images. The performance of MLP shows initial accuracy of 79.78%. We further augment the MLP with graph cut to increase accuracy to 84%. We argue that with the successful development and deployment of this new system, the Technology Department of Chongqing can arrange the recommended actions and thus save cost in repair and outages. This can play an important role in the quick and reliable inspection to potentially prevent power substation equipment from failure, which will save the whole system from breakdown. The increased 84% accuracy with the integration of the graph cut shows the efficacy of the proposed defect analysis approach.

  14. Workers exposure to electric fields in 400 kV substations and overhead line works

    International Nuclear Information System (INIS)

    Elovaara, J.; Kuisti, H.; Korpinen, L.

    2010-01-01

    The maximum exposing electric field strength magnitude in the highly inhomogeneous 400 kV electric field under work conditions can reach the value of several tens of kV/m. In spite of this the average current density is, in Finland, always lower than 10 mA/m 2 . Furthermore, the total body currents or contact currents are in 400 kV works clearly less than the limit value proposed by the EU's draft for Directive. On the basis of the obtained results it can be concluded that from the limit value point of view it is not necessary to take further actions to reduce the exposure of the workers when they are working in 400 kV substations and on 400 kV overhead lines. However, because the transient peak values of the contact current can be painful and disturb work, it is advisable to develop a safe and reliable method to connect the worker and the work object in the common ground (equipotential bonding). (authors)

  15. INTELLIGENT DIAGNOSTIC SYSTEM OF EMERGENCY SITUATIONS IN TRACTION SUBSTATIONS DC

    Directory of Open Access Journals (Sweden)

    Sh. N. Nasyrov

    2009-09-01

    Full Text Available In the article the architecture and algorithm of operating an expert system providing the efficiency of functioning the electric equipment for traction substation as well as the four-parameter belonging function are determined.

  16. A novel approach to verify the influence of atmospheric parameters in substations concerning lightning

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Andre Nunes de; Silva, Ivan Nunes da; Ulson, Jose Alfredo C.; Zago, Maria Goretti [UNESP, Bauru, SP (Brazil). Dept. de Engenharia Eletrica]. E-mail: andrejau@bauru.unesp.br

    2001-07-01

    This paper demonstrates that artificial neural networks can be used effectively for estimation of parameters related to study of atmospheric conditions to high voltage substations design. Specifically, the neural networks are used to compute the variation of electrical field intensity and critical disruptive voltage in substations taking into account several atmospheric factors, such as pressure, temperature, humidity. Examples of simulation of tests are presented to validate the proposed approach. The results that were obtained by experimental evidences and numerical simulations allowed the verification of the influence of the atmospheric conditions on design of substations concerning lightning. (author)

  17. Occupational exposure to electric fields and induced currents associated with 400 kV substation tasks from different service platforms.

    Science.gov (United States)

    Korpinen, Leena H; Elovaara, Jarmo A; Kuisti, Harri A

    2011-01-01

    The aim of the study was to investigate the occupational exposure to electric fields, average current densities, and average total contact currents at 400 kV substation tasks from different service platforms (main transformer inspection, maintenance of operating device of disconnector, maintenance of operating device of circuit breaker). The average values are calculated over measured periods (about 2.5 min). In many work tasks, the maximum electric field strengths exceeded the action values proposed in the EU Directive 2004/40/EC, but the average electric fields (0.2-24.5 kV/m) were at least 40% lower than the maximum values. The average current densities were 0.1-2.3 mA/m² and the average total contact currents 2.0-143.2 µA, that is, clearly less than the limit values of the EU Directive. The average values of the currents in head and contact currents were 16-68% lower than the maximum values when we compared the average value from all cases in the same substation. In the future it is important to pay attention to the fact that the action and limit values of the EU Directive differ significantly. It is also important to take into account that generally, the workers' exposure to the electric fields, current densities, and total contact currents are obviously lower if we use the average values from a certain measured time period (e.g., 2.5 min) than in the case where exposure is defined with only the help of the maximum values. © 2010 Wiley-Liss, Inc.

  18. SUBCALC 2.0 -- Substation magnetic field modeling program: User's manual

    International Nuclear Information System (INIS)

    Pappa, J.R.; Silva, J.M.; Kasten, D.; Sebo, S.; Ohio State Univ., Columbus, OH

    1995-11-01

    SUBCALC, a Microsoft reg-sign Windows trademark application, allows users to map magnetic fields in or around electric utility substations from common types of substation equipment. SUBCALC allows users to create a substation using predefined transmission and distribution lines and other substation components and to quickly modify them to match the desired operating conditions. Users have the option of invoking Power Line Calculator, a program that integrates with SUBCALC, to define power line conditions such as currents, phase angles, power factor, or symmetric components for three-phase lines that are unbalanced or carry net current. SUBCALC 2.0 offers numerous modeling, user interface, and editing enhancements. For example, users can now produce multi-segmented linear profile plots, take spot measurements anywhere in the model, extend lines with automatic connectivity to preexisting structures, and produce phantom extensions of lines beyond the model to avoid a ''stunted'' appearance to the field map. The program's output is available in four possible formats, including a three-dimensional map of the magnetic field, two-dimensional contours, two-dimensional profile plots, and a table with statistical values. All formats may be printed, accompanied by a three-dimensional view of the world the user has drawn

  19. 20 CFR 631.50 - Substate plan.

    Science.gov (United States)

    2010-04-01

    ... THE JOB TRAINING PARTNERSHIP ACT Substate Programs § 631.50 Substate plan. (a) In order to receive an...)). (g) If a substate grantee fails to meet the requirements for plan submission and approval found in...

  20. METHODOLOGY OF DETERMINATION OF QUALITY INDEX OF MAINTENANCE SERVICE SYSTEM OF POWER EQUIPMENT OF TRACTION SUBSTATIONS

    Directory of Open Access Journals (Sweden)

    O.O. Matusevych

    2016-03-01

    Full Text Available Purpose. The purpose of this paper is development of methodology for definition of a quality system of maintenance and repair (M and P power equipment of traction substations (TS of electrified railways operating under conditions of uncertainty based on expert information. Methodology. The basic tenets of the theory of fuzzy sets and marks, linguistic and interval estimates of experts were applied to solve this problem. Results. Analysis of the existing diversity of approaches to development of modern methods of improvement of M and P allows us to conclude that the improvement in the quality of the system is achieved by solving individual problems increase the operational reliability of power equipment of traction substations in the following main interrelated areas. There are technical, economic and organizational. The basis of the quality evaluation system is initial data and expertise developed version of the document formalized quality evaluation of electrical equipment of traction substations by experts. The choice of determining the level of Quality service system based on the marks, linguistic and interval estimates of experts, which are reflected in quantitative and / or qualitative form was done. The possible options for expert data presentation and their corresponding quantitative methods of calculating the integral index of quality improvement system maintenance and P of traction substations were described. The methodology and the method of assessing the quality of system maintenance and P of TS allows quickly respond to changing operating conditions of power equipment of traction substations, and to determine the most effective strategies for maintenance of electrical and P TS under conditions of uncertainty functioning distance electricity. Originality. The method of a systematic approach to improve the quality of the system maintenance and P of power equipment of traction substation under conditions of uncertainty based on expert

  1. Augmented Reality Applications for Substation Management by Utilizing Standards-Compliant SCADA Communication

    Directory of Open Access Journals (Sweden)

    Miro Antonijević

    2018-03-01

    Full Text Available Most electrical substations are remotely monitored and controlled by using Supervisory Control and Data Acquisition (SCADA applications. Current SCADA systems have been significantly enhanced by utilizing standardized communication protocols and the most prominent is the IEC 61850 international standard. These enhancements enable improvements in different domains of SCADA systems such as communication engineering, data management and visualization of automation process data in SCADA applications. Process data visualization is usually achieved through Human Machine Interface (HMI screens in substation control centres. However, this visualization method sometimes makes supervision, control and maintenance procedures executed by engineers slow and error-prone because it separates equipment from its automation data. Augmented reality (AR and mixed reality (MR visualization techniques have matured enough to provide new possibilities of displaying relevant data wherever needed. This paper presents a novel methodology for visualizing process related SCADA data to enhance and facilitate human-centric activities in substations such as regular equipment maintenance. The proposed solution utilizes AR visualization techniques together with standards-based communication protocols used in substations. The developed proof-of-concept AR application that enables displaying SCADA data on the corresponding substation equipment with the help of AR markers demonstrates originality and benefits of the proposed visualization method. Additionally, the application enables displaying widgets and 3D models of substation equipment to make the visualization more user-friendly and intuitive. The visualized SCADA data needs to be refreshed considering soft real-time data delivery restrictions. Therefore, the proposed solution is thoroughly tested to demonstrate the applicability of proposed methodology in real substations.

  2. Electrical Equipment of Electrical Stations and Substations,

    Science.gov (United States)

    1979-10-25

    flocronthoro ’roka "rNUSPONUS reuepa’rop Tpexzaamor TOKA 6C. so, iso ynpomxeuuoe 63aeg (O#cms1poHM reHepaTop C ObiBeleHnbumH WeCTblo KoimaUU itA3...currents during short circuit on the terminals/grippers: the turbogenerators 12): .I1’ 1.5; the hydraulic generators 0a:I. ,-0 (.PA >3) ISO ---01...330TATl 111-31500/110 BC- 17,5 (10,5) 6800 5600 7600 123 397 Bll - 10,5 (17) C11 - 6.3 (6) TJATI 11-000/I10 - 8583 5275 7700 129 474 TLI, 11’--I.U500/I 1o

  3. Substation Reactive Power Regulation Strategy

    Science.gov (United States)

    Zhang, Junfeng; Zhang, Chunwang; Ma, Daqing

    2018-01-01

    With the increasing requirements on the power supply quality and reliability of distribution network, voltage and reactive power regulation of substations has become one of the indispensable ways to ensure voltage quality and reactive power balance and to improve the economy and reliability of distribution network. Therefore, it is a general concern of the current power workers and operators that what kind of flexible and effective control method should be used to adjust the on-load tap-changer (OLTC) transformer and shunt compensation capacitor in a substation to achieve reactive power balance in situ, improve voltage pass rate, increase power factor and reduce active power loss. In this paper, based on the traditional nine-zone diagram and combining with the characteristics of substation, a fuzzy variable-center nine-zone diagram control method is proposed and used to make a comprehensive regulation of substation voltage and reactive power. Through the calculation and simulation of the example, this method is proved to have satisfactorily reconciled the contradiction between reactive power and voltage in real-time control and achieved the basic goal of real-time control of the substation, providing a reference value to the practical application of the substation real-time control method.

  4. Real business of electrical skill

    International Nuclear Information System (INIS)

    1981-03-01

    This book introduces electrical structure and duty of electric security officials with definition, kinds, safe system for electrical structure and position, mission, duty, license and revocation of one's license of officials. It also deals with plan for non utility electric installation such as condition control, the cost of materials and the cost of construction, important equipment and materials, supervisory control, design on non utility power substation, construction of non utility power substation, high voltage substation by cubicle interior wiring, utilization equipment, communication installation and safe work and safe education of electricity and related regulations.

  5. Seismic damage in the electrical substations of the Colima state; Dano sismico en las subestaciones electricas del estado de Colima

    Energy Technology Data Exchange (ETDEWEB)

    Mena H, Ulises; Lopez L, Alberto; Guerrero F, Vicente A. [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2004-07-01

    On the 21 of January of 2003, at 20:06:36 hrs (Mexico center time) an earthquake occurred at the Pacific coast with a magnitude of 7.6 degrees in the Richter scale, whose epicenter was located near the state of Colima and it was felt in a large extent of the Mexican Republic. The earthquake caused numerous material damages in the structures (houses, churches, offices, etc) and vital lines, mainly in the infrastructure of the electrical sector of the region, leaving without electrical energy a large part of the nearby populations and some colonies of distant zones such as in Mexico City. The cause of the interruption of the electrical energy was due to the collapse of some of the equipment of 400 and 230 KV of the electrical transmission substations, among which are Manzanillo II and Colima II. With the experience acquired in the earthquake of October 9, 1995 in Manzanillo, in which also the facilities and equipment of the electrical substations were affected considerably, and as a part of the infrastructure project on the analysis of seismic risk of vital lines that is being developed at this moment at the Instituto de Investigaciones Electricas (IIE), it was decided to inspect the electrical substations of the zone, where the greater damages in the facilities and equipment were reported, to analyze and to determine the main causes of their failure. [Spanish] El 21 de enero de 2003, a las 20:06:36 hrs (hora del centro de Mexico) ocurrio un sismo en la costa del Pacifico con una magnitud de 7.6 grados en escala Richter, cuyo epicentro se localizo cerca del estado de Colima y se percibio en gran parte de la republica mexicana. El sismo causo cuantiosos danos materiales en las estructuras (viviendas, iglesias, oficinas, etc) y lineas vitales, principalmente en la infraestructura del sector electrico de la region, dejando sin energia electrica a gran parte de las poblaciones cercanas y algunas colonias de zonas lejanas como es la ciudad de Mexico. La causa del corte de

  6. Alternative surfacing materials for weed control at BC Hydro substations

    International Nuclear Information System (INIS)

    Wells, T.C.; Shrimpton, G.M.

    1997-01-01

    A two year study was conducted by BC Hydro in which a variety of surfacing materials were tested for their suitability for use in substations. Ideally, surfacing materials should have the following characteristics: high electrical resistivity in both dry and wet conditions, resistance to invasion by weeds, good driveability, good drainage, non-flammable, reasonably priced, no dust to foul conductors, and be aesthetically pleasing. Trials at Vernon Koksilah, and Ingledow substations were conducted to test the materials. A qualitative estimate of the amount of weed control provided by each material was recorded. The trials were meant to provide operational recommendations and screening information to allow for future testing of promising materials or combination of materials. Results showed that no single material meets all the desired criteria. The surfaces that best combined good weed control, electrical resistance and surface stability was a 15 cm deep layer of crushed gravel, especially if underlain by a layer of geotextile. 4 refs., 3 tabs., 1 fig

  7. Laws and ordinances on electric arc protection. Electric arc protection of electric plants; Gesetze und Verordnungen zur Stoerlichtbogensicherheit. Stoerlichtbogensicherheit von elektrischen Betriebsstaetten

    Energy Technology Data Exchange (ETDEWEB)

    Bernards, Stefan; Buenger, Stefan; Grote, Martin [Fritz Driescher KG - Spezialfabrik fuer Elektrizitaetswerksbedarf GmbH und Co., Wegberg (Germany); Boettcher, Lutz-Michael [Ingenieurbuero Boettcher-Consult, Schulzendorf (Germany); Weck, Karl-Heinz [Forschungsgemeinschaft fuer Elektrische Anlagen und Stromwirtschaft (FGH e.V.), Mannheim (Germany)

    2011-02-28

    With the publication of the new standards IEC 62271-200/VDE 0671 part 200-2003: AC metal-enclosed switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV, and IEC 62271-202/VDE 0671 part 202-2007: High voltage/low voltage prefabricated substations and their revision, the fundamentals of arc protection qualification of plants and stations were redefined with a view to personnel protection. In the case of new transformer stations, the application of these standards is state of the art. The publications and the application of the new standards for staff protection, plant protection and object protection via electric arc qualification has raised questions concerning the safety of older plants and stations, modernization, reconstruction, enhancement, maintenance, and the re-use of used stations and plants.

  8. Substation interference on gas entrance of industrial plants

    Energy Technology Data Exchange (ETDEWEB)

    Freire, Paulo Edmundo; Giacommelo, Claudinei [PAIOL Engenharia, Paulinia, SP (Brazil)

    2009-12-19

    Industrial plants often have medium or high voltage electrical power entrance and also gas feeders. Often the main substation is located near the gas entrance, in the utilities area. When the occurrence of a phase to ground short-circuit in the substation, the pipeline and gas entrance that serves the plant may be exposed to high voltage soil potential, of the order of a few kilovolts, due to resistive coupling with the substation ground mesh. The consequences of this situation are reflected in various risks, with emphasis on: damage to the protective coating of the duct, due to the increased soil potential, in excess of its dielectric supportability (typically on the order of 5 kV); spread of potentially hazardous to duct exposed parts (valves, measuring place etc.); and damage to cathodic protection system components, as rectifier and insulating joins at gas entrance. This paper presents the investigations conducted in a factory that has a 69 kV main substation very close to the gas entrance, the order of a few meters away. The substation phase to ground short-circuit current is 7 kA, what causes a 9 kV soil potential near the gas pipe. It is presented the methodology for modeling the various elements involved in this process, the results of simulations made, arrangements been taken to reduce soil potential next to the duct to levels below 5 kV, and the measures for people and insulating joins protection. It is important to note that such problems usually will be solved with measures involving the entire grounding system of the industrial complex and also close to the duct (outside the industrial plant). The gas distribution companies should require from customers where this situation occurs, to ensure safety for people who have access to elements of its network, and for the integrity of their own ducts and cathodic protection components. The computer simulations developed for this work were made with the software Auto Grid, developed by the Canadian company Safe

  9. Rural electrification in Chihuahua, Mexico at one third of the cost vs a conventional substation

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez, Omar; Gomez, Rolando; Solano, Arturo; Acosta, Eduardo

    2010-09-15

    This paper and presentation describes technical details about a successful experience in a unique project in Mexico for making possible the rural electrification at one third of the total cost vs a traditional substation. This alternate solution for electrification of rural communities where construction of distribution lines or traditional substations are not economically possible due to local government's budget limits or because the electrical companies are looking for the ROI Return Over Investment in poverty communities.

  10. ALGORITHMIZATION OF PROBLEMS FOR OPTIMAL LOCATION OF TRANSFORMERS IN SUBSTATIONS OF DISTRIBUTED NETWORKS

    Directory of Open Access Journals (Sweden)

    M. I. Fursanov

    2014-01-01

    Full Text Available This article reflects algorithmization of search methods of effective replacement of consumer transformers in distributed electrical networks. As any electrical equipment of power systems, power transformers have their own limited service duration, which is determined by natural processes of materials degradation and also by unexpected wear under different conditions of overload and overvoltage. According to the standards, adapted by in the Republic of Belarus, rated service life of power transformers is 25 years. But it can be situations that transformers should be better changed till this time – economically efficient. The possibility of such replacement is considered in order to increase efficiency of electrical network operation connected with its physical wear and aging.In this article the faults of early developed mathematical models of transformers replacement were discussed. Early such worked out transformers were not used. But in practice they can be replaced in one substation but they can be successfully used  in other substations .Especially if there are limits of financial resources and the replacement needs more detail technical and economical basis.During the research the authors developed the efficient algorithm for determining of optimal location of transformers at substations of distributed electrical networks, based on search of the best solution from all sets of displacement in oriented graph. Suggested algorithm allows considerably reduce design time of optimal placement of transformers using a set of simplifications. The result of algorithm’s work is series displacement of transformers in networks, which allow obtain a great economic effect in comparison with replacement of single transformer.

  11. Future power plant control integrates process and substation automation into one system; Zukunftsorientierte Kraftwerksleittechnik vereint Prozess- und Stationsautomatisierung

    Energy Technology Data Exchange (ETDEWEB)

    Orth, J. [ABB AG, Mannheim (Germany). Div. Energietechnik-Systeme

    2007-07-01

    The new IEC 61850 standard has been established for substation control systems. In future, IEC 61850 may also be widely used for electrical systems in power plants. IEC 61850 simplifies the integration of process and substation control systems in power plants by creating one automated system across manufacturers and thus makes a significant contribution to cost efficiency in operation and maintenance. (orig.)

  12. System for the design of electrical distribution substations; Sistema para el diseno de subestaciones electricas de distribucion

    Energy Technology Data Exchange (ETDEWEB)

    Zayas Perez, Benjamin Eddie; Islas Perez, Eduardo; Bahena Rada, Jessica Liliana; Romero Lima, Jesus [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Sierra Rodriguez, Benjamin; Moreno Diaz, Humberto [Comision Federal de Electricidad (Mexico)

    2011-07-01

    The physical design of electric substations involves a variety of activities, such as developing, reviewing and performing modifications to different design proposals, estimating costs and producing documents to be integrated into an executive project. These activities are usually conducted at the Distribution Divisions of the Federal Electric Commission (CFE) through two separate processes: the development of engineering plans with computer-aided design software (CAD) and volumetric calculations for the initial budget using conventional spreadsheets. The documents are manually developed on an individual basis, without the existence of any functions to allow for automatically updating the design modifications of any of the plans. The corresponding initial budget becomes a lengthy and laborious process with the likelihood of inconsistencies among the documents. In order to optimize the design process for the public and electromechanical works of electric substations (ES) in a three-dimensional (3D) graphic environment, the IIE's Management of Process Supervision, in coordination with the CFE Distribution Subdivision, developed the System for the Design of Electric Substation Distribution (SDESD). This system makes use of the advantages of CAD3D technology to develop detail engineering, cost engineering to calculate initial budgets and virtual reality for three-dimensional interactive navigation. It is worth mentioning that this system is currently in the implementation phase at the CFE Distribution Subdivision. This article briefly describes the main stages in the development of the project, as well as the functioning and principal components of the system. [Spanish] El diseno fisico de subestaciones electricas implica una variedad de actividades, tales como elaborar, revisar y efectuar modificaciones de diferentes propuestas de diseno, estimar costos y producir documentos, para integrarlos como parte de un proyecto ejecutivo. Estas actividades usualmente se

  13. Analysis of Norm IEC 61850 in the transmission of data via communications network of substations

    Energy Technology Data Exchange (ETDEWEB)

    Renda, T.; Botura Junior, G. [Universidade Estadual Paulista (UNESP), Sorocaba, SP (Brazil); Mesquita, L.; Rizol, P.M.S.R. [Universidade Estadual Paulista (UNESP), Guaratingueta, SP (Brazil)

    2009-07-01

    The tendency of using a protocol allows electrical substations to become 'intelligent', that is, capable of communicating in a much more efficient manner. This greatly reduces the number of connections, and as a consequence optimizes the speed between messages. The Norm IEC 61850-9-2 came to minimize the use of cables for the interconnections of various equipment involved in safety procedures of a substation. The present paper, has the objective of identifying a way of integrating the Norm IEC-61850 with the transmission of data via 'Generic Object Oriented Substation Event' (GOOSE) and of substituting the direct connection of binary I/O's of the Intelligent Electronic Devices also known as IED's. (author)

  14. Improved district heating substation efficiency with a new control strategy

    International Nuclear Information System (INIS)

    Gustafsson, Jonas; Delsing, Jerker; Deventer, Jan van

    2010-01-01

    In this paper, we describe a new alternative control approach for indirectly connected district heating substations. Simulations results showed that the new approach results in an increased ΔT across the substation. Results were obtained for both ideal and non-ideal operation of the system, meaning that less water must be pumped through the district heating network, and a higher overall fuel efficiency can be obtained in the district heating power plants. When a higher fuel efficiency is achieved, the usage of primary fuel sources can be reduced. Improved efficiency also increases the effective heat transfer capacity of a district heating network, allowing more customers to be connected to an existing network without increasing the heating plant or network capacity. Also, if combined heat and power plants are used to produce the heat, the increased ΔT will result in a further improved overall fuel efficiency, as more electricity can be produced with colder cooling water. The idea behind the new control method is to consider the temperature of the water supplying the district heating substation with heat, often referred to as the primary supply temperature. This represents a logical next step, as currently, the only parameter generally taken into account or measured when controlling the temperature level of the radiator circuit is the local outdoor temperature. In this paper we show how the primary supply temperature together with thermodynamic knowledge of the building can be used to maximize the ΔT across the district heating substation.

  15. Development of Diagnostic Technology for Substation Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kweon, D.J.; Yoon, J.Y. [Korea Electric Power Research Institute, Taejeon (Korea, Republic of)

    1998-09-01

    This report contains the conceptual design of predictive diagnostic system for KEPCO 765kV substation apparatus which will be operated in 2001. Various kinds of techniques in the world for power transformer and GIS monitoring were examined, then the integrated diagnosis system configuration which will be most effective in our future substation was suggested. In addition, the development of the optimum life management for substation facilities. development of a system to measure the ESDD of substation insulator surfaces at a distance and application study of the degradation sensor(PCS) were described also. (author) 55 refs., 27 figs., 68 tabs.

  16. The evolution of the Luz y Fuerza del Centro substations. Volume 2; Evolucion de las subestaciones de Luz y Fuerza del Centro. Volumen 2

    Energy Technology Data Exchange (ETDEWEB)

    Carranza Ramirez, Sergio [Luz y Fuerza del Centro, Mexico, D. F. (Mexico)

    1997-12-31

    This document cites historical background of how the Luz y Fuerza del Centro substations have evolved up to nowadays. A brief description is made of one electric substation, the substation design criteria are mentioned, since it must comply with the requirements of reliability, service continuity, service quality, economy, geographical location, just for mentioning some of them. The more utilized arrangements of the Luz y Fuerza del Centro substations are described. In the same manner, the remote control substations are described mentioning the main elements of this type of substations. Mention is made also of the technological incorporations that have been made to the substations and the perspectives there are from these. One line diagrams of the electric substations are shown, as well as from power plant substations [Espanol] Este documento cita antecedentes historicos de como han evolucionando las subestaciones de Luz y Fuerza del Centro hasta hoy en dia. Se realiza una breve descripcion de una subestacion electrica, se mencionan los criterios de diseno de una subestacion, ya que debe cumplir con los requisitos de confiabilidad, continuidad, calidad del servicio, economia, situacion geografica, por mencionar algunos de estos. Se describen los arreglos de las subestaciones mas utilizados por Luz y Fuerza del Centro. De igual manera se describen las subestaciones telecontroladas mencionando los principales elementos de este tipo de subestaciones. Se mencionan las incorporaciones tecnologicas que se han realizado a las subestaciones y las perspectivas que se tienen de estas. Se muestran diagramas unifilares de subestaciones electricas, al igual que se muestran las plantas de las subestaciones

  17. Availability analysis of high voltage substations considering its main equipment; Analise de disponibilidade de subestacoes de alta tensao considerando seus principais equipamentos

    Energy Technology Data Exchange (ETDEWEB)

    Santos, R.C. [Universidade Federal do ABC (UFABC), Santo Andre, SP (Brazil)], E-mail: ricardo.santos@ufabc.edu.br; Basseto, B.A.; Cugnasca, P.S.; Almeida Junior, J.R.; Camargo Junior, J.B. [Universidade de Sao Paulo (USP), SP (Brazil). Escola Politecnica], Emails: ricardo.santos@ufabc.edu.br, joao.camargo@poli.usp.br

    2009-07-01

    This paper evaluates the availability of electric power substations, based on Monte Carlo simulation and Fault Tree Analysis, which can be used in a larger way, considering various scenarios, usually founded. The main fallouts modes considered in the availability analysis of power systems, as well as the main methods applied to reach this goal are discussed. The availability indexes of the Monte Carlos simulation are sufficient to indicate the critical points of the power system, and to make comparisons between different substations, related to the performance levels. Through these indexes it is possible to evaluate the impact of a switching action in a determined substation. For this, the substation studied indexes are compared before and after the switching action be considered to the substation in reference.

  18. 浅谈风电场110kV变电站工程建设管理%Analysis on the Construction Management of 110 kV Substation Project in Wind Farm

    Institute of Scientific and Technical Information of China (English)

    2013-01-01

      变电站是风电场必备的集电、送电系统,其主要功能是将风电机组所发电能汇集后,通过高压线路输送到电网上。%Substation is a requisite power system for collecting and delivering electricity in wind farm. Its main function is to gather electricity generated by wind turbines and delivery the electricity to grid through the high voltage cable. The substation is a hub that connects wind farm and grid,which plays a crucial role in delivering and saleing the electricity in wind farm. e paper analyzed the engineering design, construction, commissioning and acceptance of the 110KV substation of Helan Mountain Wind Farm in Azuoqi, Inner Mongolia, explored the scienti c and rational construction techniques and modes in the process of wind farm substation engineering and provided reference for the substation construction and management of wind farm in the future.

  19. Study of overvoltages by phenomenon of ferroresonance in the substation Filadelfia of the Sistema Electrico Nacional

    International Nuclear Information System (INIS)

    Montealegre Lobo, Leonardo

    2012-01-01

    The mathematical analysis of the phenomenon of ferroresonance is far from easy especially when is looked an exact solution and is wanted to take into account all relevant considerations, that the characteristic of non-linearity has presented in this phenomenon. However, a series of appropriate simplifications are conducted and is possible simulate successfully variables of interest, in this case, voltages and currents. Personnel of the Area Proteccion y Medicion, Region Chorotega of the UEN Transporte Electrico (UEN TE) has approached the Centro de Investigacion en Sistemas de Potencia to be provided by a technical support in understanding (cause and possible mitigation) of a transient event that has caused the arrester output of the Subestacion Filadelfia after conducting an energization operation in said substation. The main supply by the personnel of the UEN TE has been the current measurement of fault recorder of differential protection of power transformer, the wave forms current are recorded 100 ms before, during and 200 ms after the occurrence of the event that has blown the lightning rods low side of the substation power transformer. Research has allowed to generate the simplifications needed to reconstruct the event occurred in substation in the absence of the voltage measurements of recorded event, the magnetization curve of the transformers, the electrical characteristics of underground cables and lightning rod present in the substation. Ranges are detailed on the determination of the reasons that have caused the explosion of lightning rods in the rod 13.8 kV of substation Filadelfia when maneuvering connection of electrical equipment for energization Ingenio El Viejo. Recommendations are offered for minimizing the effects caused by these maneuvers. (author) [es

  20. Directional sound radiation from substation transformers

    International Nuclear Information System (INIS)

    Maybee, N.

    2009-01-01

    This paper presented the results of a study in which acoustical measurements at two substations were analyzed to investigate the directional behaviour of typical arrays having 2 or 3 transformers. Substation transformers produce a characteristic humming sound that is caused primarily by vibration of the core at twice the frequency of the power supply. The humming noise radiates predominantly from the tank enclosing the core. The main components of the sound are harmonics of 120 Hz. Sound pressure level data were obtained for various directions and distances from the arrays, ranging from 0.5 m to over 100 m. The measured sound pressure levels of the transformer tones displayed substantial positive and negative excursions from the calculated average values for many distances and directions. The results support the concept that the directional effects are associated with constructive and destructive interference of tonal sound waves emanating from different parts of the array. Significant variations in the directional sound pattern can occur in the near field of a single transformer or an array, and the extent of the near field is significantly larger than the scale of the array. Based on typical dimensions for substation sites, the distance to the far field may be much beyond the substation boundary and beyond typical setbacks to the closest dwellings. As such, the directional sound radiation produced by transformer arrays introduces additional uncertainty in the prediction of substation sound levels at dwellings within a few hundred meters of a substation site. 4 refs., 4 figs.

  1. Electric utility report '80

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    A collection of brief atricles describes the trends and developments in Canada's electric utilities for the 1980's. Generating stations planned or under construction are listed. The trends in technology discused at a recent Canadian Electrical Association meeting are summarized in such areas as turbine stability control, power line vibration control, system reliability, substations and transformer specifications. Developments in nuclear generation are discussed and compared on the world scale where Japan, for example, has the world's largest nuclear program. Progress on fusion is discussed. In Canada the electric utilities are receiving the support of the comprehensive nuclear R and D program of Atomic Energy of Canada Ltd. New innovations in utility technology such as street lighting contactors, superconductive fault limiters and demand profile analyzers are discussed. (T.I.)

  2. Helping utilities harness the power of the web for substation automation

    Energy Technology Data Exchange (ETDEWEB)

    Finney, D.

    2000-11-01

    The significance of the Internet to the deregulated electric power industry and the ability to tap into the benefits of Web-enabled substation monitoring and control are reviewed. It is this author's contention that the convergence of Internet access from PCs, servers and Internet-ready intelligent electronic devices make it possible to have full-scale substation automation and control without the high price tag associated with SCADA systems. Whereas in the past automation solutions were thought to be appropriate only for big utilities, the potential of the Internet such as the GE-hosted enerVista.com service, which is made up of a number of modules which can provide many of the services of a complex enterprise management system at a fraction of the cost, make it possible for smaller utilities to overcome substation automation problems at an affordable cost. By having the communications link over the web, and data acquisition hosted by an outside vendor, even the smallest municipal utility can have the most up-to-date equipment at their disposal, and expand their control to SCADA-level functionality without having to incur the usual programming and technology costs. The example of Whitby Hydro to automate their three substation system with GE Power Management's Universal Relay (UR) intelligent electronic device system by installing a modem as an Internet appliance for 24/7 monitoring, optional protection and control, is cited. Utilities in Oshawa and Thunder Bay, Ontario, and others in New York State and Tennessee, are some of the other utilities currently involved in developing web-based applications that address their unique requirements. At present, there appears to be no limit to the role that the Internet can play in substation automation and control for utilities competing in a global market.

  3. Guidelines for the development of applicative software for supervising and remote electric power substations; Diretrizes de desenvolvimento de softwares aplicativos para as estacoes supervisoras e remotas

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Guilherme Moutinho; Soares, Wellington Zakhia; Morais, Arnoldo Magela [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1995-12-31

    The increasing application of remote control supervision systems composed of regional operation centers (COR) and remote terminal units (UTR) creates the adequate conditions for the development and implementation of operational engineering functions in electric power substations (SE). In order to provide the necessary elements for such qualitative improvement, this work presents guidelines for the development of applicative soft-wares for the local control and supervision to be installed in CORs and UTRS, based in CEMIG`s, the electric power company of Minas Gerais State - Southeast Brazil, experience 4 refs.

  4. Electric machinery and drives in thermal power stations

    International Nuclear Information System (INIS)

    1974-01-01

    The following subjects were dealt with during the VDE meeting: 1) Requirements made by the electric network on the generators and their excitation equipment, and the influence thereof on their design; 2) requirements made by the power station process on the electric drives and the influence thereof on type and design; 3) requirements made on protective measures from the point of the electric power station machinery. (TK) [de

  5. Guidelines for District Heating Substations

    Energy Technology Data Exchange (ETDEWEB)

    2009-07-15

    The present guidelines contain a set of recommendations focusing on planning, installation, use and maintenance of district heating (DH) substations within district heating systems throughout Europe. The recommendations were developed in order to enable readers to develop well-functioning substations and an effective heat and domestic warm water delivery. These guidelines are intended to give the most effective overall solutions for various parts of the customer installation. The guidelines are not meant to specify the different components of the substation such as meters or heat exchangers. The guidelines deal with a wide variety of issues concerning both present systems of today and district heating systems of the future. Specific handling and maintenance recommendations are mainly focused on present modern systems but are also intended to cover the future situation as much as is feasible. For this reason, certain existing systems are not dealt with in these guidelines. For instance, these guidelines do not cover steam systems, systems with temperatures exceeding 110 deg C and pressure levels above 1.6 MPa. The guidelines include a chapter on the heat meter, as the meter and especially the meter installation is always installed simultaneously with the rest of the substation. These guidelines aim to provide best-practice and easy-to-handle recommendations for: - those who are responsible for relations between district heating utilities and customers; - those who own or maintain a building connected to the district heating network; - those who manufacture, plan, purchase, test and install substations. These guidelines do not deal with investment or cost aspects, but in general, Euroheat and Power recommends looking at the lifetime cost of all components of the substation, instead of investment costs alone. An example of this is provided in Chapter 7.8. The Guidelines were developed based on the most optimal operating principles of substations and meters

  6. VT Data - Electric Charging Stations

    Data.gov (United States)

    Vermont Center for Geographic Information — Locations of Electric Charging Stations provided by the NREL national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy....

  7. Autonomous Electrical Vehicles’ Charging Station

    OpenAIRE

    Józef Paska; Mariusz Kłos; Łukasz Rosłaniec; Rafał Bielas; Magdalena Błędzińska

    2016-01-01

    This paper presents a model of an autonomous electrical vehicles’ charging station. It consists of renewable energy sources: wind turbine system, photovoltaic cells, as well as an energy storage, load, and EV charging station. In order to optimise the operating conditions, power electronic converters were added to the system. The model was implemented in the Homer Energy programme. The first part of the paper presents the design assumptions and technological solutions. Further in the paper...

  8. Improved approach for electric vehicle rapid charging station placement and sizing using Google maps and binary lightning search algorithm

    Science.gov (United States)

    Shareef, Hussain; Mohamed, Azah

    2017-01-01

    The electric vehicle (EV) is considered a premium solution to global warming and various types of pollution. Nonetheless, a key concern is the recharging of EV batteries. Therefore, this study proposes a novel approach that considers the costs of transportation loss, buildup, and substation energy loss and that incorporates harmonic power loss into optimal rapid charging station (RCS) planning. A novel optimization technique, called binary lightning search algorithm (BLSA), is proposed to solve the optimization problem. BLSA is also applied to a conventional RCS planning method. A comprehensive analysis is conducted to assess the performance of the two RCS planning methods by using the IEEE 34-bus test system as the power grid. The comparative studies show that the proposed BLSA is better than other optimization techniques. The daily total cost in RCS planning of the proposed method, including harmonic power loss, decreases by 10% compared with that of the conventional method. PMID:29220396

  9. Improved approach for electric vehicle rapid charging station placement and sizing using Google maps and binary lightning search algorithm.

    Directory of Open Access Journals (Sweden)

    Md Mainul Islam

    Full Text Available The electric vehicle (EV is considered a premium solution to global warming and various types of pollution. Nonetheless, a key concern is the recharging of EV batteries. Therefore, this study proposes a novel approach that considers the costs of transportation loss, buildup, and substation energy loss and that incorporates harmonic power loss into optimal rapid charging station (RCS planning. A novel optimization technique, called binary lightning search algorithm (BLSA, is proposed to solve the optimization problem. BLSA is also applied to a conventional RCS planning method. A comprehensive analysis is conducted to assess the performance of the two RCS planning methods by using the IEEE 34-bus test system as the power grid. The comparative studies show that the proposed BLSA is better than other optimization techniques. The daily total cost in RCS planning of the proposed method, including harmonic power loss, decreases by 10% compared with that of the conventional method.

  10. Evolutionary growth for Space Station Freedom electrical power system

    Science.gov (United States)

    Marshall, Matthew Fisk; Mclallin, Kerry; Zernic, Mike

    1989-01-01

    Over an operational lifetime of at least 30 yr, Space Station Freedom will encounter increased Space Station user requirements and advancing technologies. The Space Station electrical power system is designed with the flexibility to accommodate these emerging technologies and expert systems and is being designed with the necessary software hooks and hardware scars to accommodate increased growth demand. The electrical power system is planned to grow from the initial 75 kW up to 300 kW. The Phase 1 station will utilize photovoltaic arrays to produce the electrical power; however, for growth to 300 kW, solar dynamic power modules will be utilized. Pairs of 25 kW solar dynamic power modules will be added to the station to reach the power growth level. The addition of solar dynamic power in the growth phase places constraints in the initial Space Station systems such as guidance, navigation, and control, external thermal, truss structural stiffness, computational capabilities and storage, which must be planned-in, in order to facilitate the addition of the solar dynamic modules.

  11. Design and development of electric vehicle charging station equipped with RFID

    Science.gov (United States)

    Panatarani, C.; Murtaddo, D.; Maulana, D. W.; Irawan, S.; Joni, I. M.

    2016-02-01

    This paper reports the development of electric charging station from distributed renewable for electric vehicle (EV). This designed refer to the input voltage standard of IEC 61851, plugs features of IEC 62196 and standard communication of ISO 15118. The developed electric charging station used microcontroller ATMEGA8535 and RFID as controller and identifier of the EV users, respectively. The charging station successfully developed as desired features for electric vehicle from renewable energy resources grid with solar panel, wind power and batteries storage.

  12. Protection Coordination in Electrical Substation Part-2 Unit Protections (Differential and Distance Protection)

    OpenAIRE

    TÜR, Mehmet Rida; Shobole, Abdulfetah; Baysal, Mustafa; Wadi, Mohammed

    2018-01-01

    Power systemsmust be protected against faults to ensure quality and reliable generation,transmission and distribution of power systems. Power system protection is providedby the protection relays. This paper is the second part of the ProtectionCoordination study for the Siddik Kardesler Substation. The protection fortransmission lines, transformer, bus bars and customer feeders is provided byovercurrent protection, differential and distance protection schemes. In thispaper, issues related wit...

  13. Reducing lighting electricity use in underground metro stations

    International Nuclear Information System (INIS)

    Casals, Miquel; Gangolells, Marta; Forcada, Núria; Macarulla, Marcel

    2016-01-01

    Highlights: • Lighting systems are big energy consumers in underground metro stations. • An adaptive lighting system strategy is developed for underground stations. • Dimming controls are based on station occupancy levels and maintenance cycles. • The k-means clustering technique is used to identify stations’ occupancy patterns. • Savings were found to amount to 255.47 MW h in 2 years for a case study metro network. - Abstract: Lighting systems are usually one of the largest electrical end-uses in underground metro stations. Taking into account that budget restrictions in publicly owned companies hinder energy efficiency retrofit projects that require high initial investments, affordable energy saving strategies are needed. This paper presents a low-cost approach for reducing lighting electricity use in underground stations, without affecting passengers’ comfort or the metro operator’s service. For this purpose, an adaptive lighting strategy of dimming the illuminance levels of artificial light sources has been developed. Dimming controls are based on the occupancy of the station, and the preventive maintenance and cleaning cycles of the luminaires. The stations’ monthly occupancy patterns are defined through the k-means clustering technique. To illustrate its effectiveness, the method was applied to 115 underground stations of the Barcelona metro network. The results revealed overall electricity savings of 255.47 MW h on a biannual basis, which represents 36.22% of the stations’ baseline lighting consumption. Individual energy savings were found to range from 25 to 87.5 MW h/year in the stations of the Barcelona metro network, depending on the number and profile of station users. The research findings will undoubtedly be useful for the future energy efficiency project plans of worldwide metro operators and managers of other underground spaces.

  14. IMPROVED ALGORITHM FOR CALCULATING COMPLEX NON-EQUIPOTENTIAL GROUNDING DEVICES OF ELECTRICAL INSTALLATIONS TAKING INTO ACCOUNT CONDUCTIVITY OF NATURAL GROUNDINGS

    Directory of Open Access Journals (Sweden)

    K. A. Starkov

    2017-08-01

    Full Text Available Purpose. The method of natural concentrated groundings substitution by the set of electrodes taking them into account in the algorithm of electric characteristics calculation for complicated grounding connections of electric installation is offered. An equivalent model as a set of linear electrodes is chosen in accordance with two criteria: leakage resistance and potentials on the ground surface. Methodology. We have applied induced potential method and methods for computing branched electrical circuits with distributed parameters. Results. We have obtained the algorithm for calculating complex non-equipotential grounding connections, which makes it possible to obtain refined values of the potential distribution in the electric stations and substations with outdoor switchgear. Originality. For the first time, we have taking into account the conductivity of natural concentrated grounds by a set of vertical and horizontal electrodes based on equivalent electrical characteristics applied to a two-layer ground. Practical value. The using of the proposed calculation algorithm in the electric grids of JSC «Kharkivoblenergo» made it possible to determine the values of the potential distribution at short circuit in electrical substation taking into account the influence of the conductivity of natural concentrated groundings.

  15. Decision 2010-021 : TransAlta Wind Ardenville wind plant and substation : application no. 1604970, proceeding ID 260

    International Nuclear Information System (INIS)

    2010-01-01

    TransAlta Wind, a wholly owned subsidiary of TransAlta Corporation, filed an application in April 2009 to construct and operate the Ardenville wind farm and substation in Alberta. The wind farm consists of 23 wind turbines, each rated at 3 MW, for a total installed capacity of 69 MW. The wind farm would be connected to the Alberta Interconnected Electric System at the substation. TransAlta anticipates that a new 138-kV transmission line will be required and has contacted the transmission facilities for the future applications. The Alberta Utilities Commission issued a notice to all interested parties and landholders within 2 km of the proposed wind farm. Two residents raised concerns regarding the use of fossil fuels and alternative fuels, ecological impacts and aesthetic impacts of wind farms and land values. Upon review of information, the Commission was satisfied that approval of the application was in the public interest and that the wind farm complies with all regulatory requirements, including sound levels. Pursuant to sections 11, 14 and 15 of the Hydro and Electric Energy Act, the Commission approved the application and granted approval to TransAlta Wind to construct and operate the Ardenville wind power plant and substation.

  16. Electric Vehicle Charging Stations as a Climate Change Mitigation Strategy

    Science.gov (United States)

    Cave, Bridget; DeYoung, Russell J.

    2014-01-01

    In order to facilitate the use of electric vehicles at NASA Langley Research Center (LaRC), charging stations should be made available to LaRC employees. The implementation of charging stations would decrease the need for gasoline thus decreasing CO2 emissions improving local air quality and providing a cost savings for LaRC employees. A charging station pilot program is described that would install stations as the need increased and also presents a business model that pays for the electricity used and installation at no cost to the government.

  17. Experimental research of variable rotation speed ICE-based electric power station

    Directory of Open Access Journals (Sweden)

    Dar’enkov Andrey

    2017-01-01

    Full Text Available Developing variable rotation speed ICE-based stand-alone electric power stations which can supply distant regions and autonomous objects with electricity are of scientific interest due to the insufficient study. The relevance of developing such electric power stations is determined by their usage is to provide a significant fuel saving as well as increase ICE motor service life. The article describes the electric station of autonomous objects with improved fuel economy. The article describes multivariate characteristic. Multivariate characteristic shows the optimal frequency of rotation of the internal combustion engine. At this rotational speed there is the greatest fuel economy.

  18. Optimal Allocation of Changing Station for Electric Vehicle Based on Queuing Theory

    Directory of Open Access Journals (Sweden)

    Yagang Zhang

    2016-11-01

    Full Text Available Electric vehicle as the main development direction of the future automotive industry, has gained attention worldwide. The rationality of the planning and construction of the power station, as the foundation of energy supply, is an important premise for the development of electric vehicles. In full consideration of the electric demand and electricity consumption, this paper proposes a new construction mode in which charging station and centralized charging station are appropriately combined and presents a location optimization model. Not only can this model be applied to determine the appropriate location for the power station, but it can use the queuing theory to determine the optimal number of power equipment, with which we can achieve the minimum costs. Finally, taking a certain city as an example, the optimum plan for power station is calculated by using this model, which provides an important reference for the study of electric vehicle infrastructure planning.

  19. ANALYSIS OF SOLAR POWER STATION SCHEMES ON PHOTOELECTRIC MODULES FOR ELECTRIC CARS CHARGING STATIONS

    Directory of Open Access Journals (Sweden)

    A. Hnatov

    2017-12-01

    Full Text Available The analysis of existing schemes for building solar power stations on photoelectric modules with the revealing of their operation principles and functionality has been conducted. The specified technical characteristics of each of the analyzed schemes are given. The structural scheme of the solar charging station for electric cars with determining its functional capabilities and operation features is proposed. The practical application of this scheme will help to reduce the dependence on the general electric power supply network and will create conditions for its total rejection.

  20. Electric motorcycle charging station powered by solar energy

    Science.gov (United States)

    Siriwattanapong, Akarawat; Chantharasenawong, Chawin

    2018-01-01

    This research proposes a design and verification of an off-grid photovoltaic system (PVS) for electric motorcycle charging station to be located in King’s Mongkut’s University of Technology Thonburi, Bangkok, Thailand. The system is designed to work independently (off-grid) and it must be able to fully charge the batteries of a typical passenger electric motorcycle every evening. A 1,000W Toyotron electric motorcycle is chosen for this study. It carries five units of 12.8V 20Ah batteries in series; hence its maximum energy requirement per day is 1,200Wh. An assessment of solar irradiation data and the Generation Factor in Bangkok, Thailand suggests that the charging system consists of one 500W PV panel, an MPPT charge controller, 48V 150Ah battery, a 1,000W DC to AC inverter and other safety devices such as fuses and breakers. An experiment is conducted to verify the viability of the off-grid PVS charging station by collecting the total daily energy generation data in the raining season and winter. The data suggests that the designed off-grid solar power charging station for electric motorcycle is able to supply sufficient energy for daily charging requirements.

  1. Utilization of waste heat from electricity generating stations

    International Nuclear Information System (INIS)

    Robertson, R.F.S.

    1977-06-01

    Historically the nuclear power station has been designed solely as an electricity producer. But in Canada today only 15 percent of our energy consumption is as electricity. The non-electrical needs today are supplied almost entirely by natural gas and oil. There is an incentive to see whether a nuclear station could supply energy for some of these non-electrical needs, thus freeing gas and oil for uses for which they may be more valuable and suitable, especially in transportation. A group located at the Whiteshell Nuclear Research Establishment undertook a series of studies to examine this problem. These studies were done in sufficient depth to provide technological and economic answers, and as a result several reports have been published on various topics. In this report, the findings from these studies are drawn together in an assessment of the potential in Canada for using waste heat. (author)

  2. Fault Current Distribution and Pole Earth Potential Rise (EPR) Under Substation Fault

    Science.gov (United States)

    Nnassereddine, M.; Rizk, J.; Hellany, A.; Nagrial, M.

    2013-09-01

    New high-voltage (HV) substations are fed by transmission lines. The position of these lines necessitates earthing design to ensure safety compliance of the system. Conductive structures such as steel or concrete poles are widely used in HV transmission mains. The earth potential rise (EPR) generated by a fault at the substation could result in an unsafe condition. This article discusses EPR based on substation fault. The pole EPR assessment under substation fault is assessed with and without mutual impedance consideration. Split factor determination with and without the mutual impedance of the line is also discussed. Furthermore, a simplified formula to compute the pole grid current under substation fault is included. Also, it includes the introduction of the n factor which determines the number of poles that required earthing assessments under substation fault. A case study is shown.

  3. Locating replenishment stations for electric vehicles: Application to Danish traffic data

    DEFF Research Database (Denmark)

    Wen, Min; Laporte, Gilbert; Madsen, Oli B.G.

    2012-01-01

    for electric vehicles on a traffic network with flow-based demand. The objective is to optimize the network performance, for example to maximize the flow covered by a prefixed number of stations, or to minimize the number of stations needed to cover traffic flows. Two mixed integer linear programming......Environment-friendly electric vehicles have gained substantial attention in governments, industry and universities. The deployment of a network of recharging stations is essential given their limited travel range. This paper considers the problem of locating electronic replenishment stations...

  4. IEEE 693 seismic qualification of composites for substation high-voltage equipment

    Energy Technology Data Exchange (ETDEWEB)

    Schiff, A.J. [Precision Measurement Instruments, Los Altos Hills, CA (United States); Kempner, L.Jr. [Bonneville Power Administration, Vancouver, BC (Canada)

    2004-07-01

    Standard 693-1997 of the Institute of Electrical and Electronic Engineers (IEEE) is the recommended practice for seismic design of substations. It represents a significant improvement in the way the power industry seismically qualifies substation high-voltage equipment. This paper described the use of IEEE Standard 693 for hollow-core composite insulators that are used on high-voltage transformers and demonstrated that changes are warranted. The following four failure modes associated with the composite insulator were discussed: bond degradation, bond failure, tube degradation and tube layer delamination. The authors evaluated the IEEE 693 qualification procedure of time history shake-table and static-pull tests and were concerned about acceptance criteria. It was shown that acceptance criteria are not valid for qualifying hollow-core composites and that static-pull tests are needed after the vibration qualification tests are completed. It was suggested that more research is warranted to determine if bonding at the top part of the flange can be eliminated, thereby eliminating bond degradation. The resulting increase in system damping would improve the dynamic response of the unit. 1 ref., 10 figs.

  5. Investigation on Transmission and Substation Facilities of Sichuan Power Grid in Wenchuan Earthquake

    Institute of Scientific and Technical Information of China (English)

    Yu Yongqing; Li Guangfan; Li Peng; Zhu Quanjun; Yuan Dalu; Wang Chengyu; Li Jinzhong; Huang Huang; Li Lixin; Zhang Xinghai; Liu Jingmin

    2009-01-01

    @@ On May 12,2008,an earthquake of Ms 8.0 hit the area around Wenchuan County,Sichuan Province,China.It has been one of the most destructive earthquakes since the founding of P.R.China in 1949.The quake caused not only tremendous loss of life and wealth,but also severe damage to transmission and substation facilities.After the disaster,an expert group from China Electric Power Research Institute (CEPRI)was sent for on-site investigation.This paper is a summary of the investigation,in which suggestions for electric equipment to resist earthquake disasters are also proponed.

  6. Investigation and comparison of the main corrosion processes on different electric power substations of the Rio Grande de Sul state, Brazil; Investigacao e comparacao dos principais processos de corrosao em diferentes subestacoes de energia eletrica do estado do Rio Grande do Sul

    Energy Technology Data Exchange (ETDEWEB)

    Brusamarello, Valner; Bianchi, Andre L.; Rieder, Ester S.; Balbinot, Alexandre; Wentz, Marcio; Konig, Diogo; Radke, Carlos [Universidade Luterana do Brasil (Ulbra), Canoas, RS (Brazil)

    2006-07-01

    In this work experiments have been developed on four electric power substations, three located at the coastal of the state of Rio Grande do Sul and one at the capital od the state, Porto Alegre city. The study had the objective to determine the corrosion ratios of the different metallic materials exposed to aggressive agents of the environment where the substations are exposed, and to determine the corrosive attack mechanisms of those materials as well, viewing the optimization using of those materials for a more extended useful life.

  7. Electricity pricing model in thermal generating stations under deregulation

    International Nuclear Information System (INIS)

    Reji, P.; Ashok, S.; Moideenkutty, K.M.

    2007-01-01

    In regulated public utilities with competitive power markets, deregulation has replaced the monopoly. Under the deregulated power market, the electricity price primarily depends on market mechanism and power demand. In this market, generators generally follow marginal pricing. Each generator fixes the electricity price based on their pricing strategy and it leads to more price volatility. This paper proposed a model to determine the electricity price considering all operational constraints of the plant and economic variables that influenced the price, for a thermal generating station under deregulation. The purpose of the model was to assist existing stations, investors in the power sector, regulatory authorities, transmission utilities, and new power generators in decision-making. The model could accommodate price volatility in the market and was based on performance incentive/penalty considering plant load factor, availability of the plant and peak/ off peak demand. The model was applied as a case study to a typical thermal utility in India to determine the electricity price. It was concluded that the case study of a thermal generating station in a deregulated environment showed that the electricity price mainly depended on the gross calorific value (GCV) of fuel, mode of operation, price of the fuel, and operating charges. 11 refs., 2 tabs., 1 fig

  8. Marion Industrial Substation project

    International Nuclear Information System (INIS)

    1992-04-01

    Consumers Power, Inc. (CPI), proposes to construct a new distribution substation under the existing Bonneville Power Administration (BPA) Albay-Lebanon transmission line near the city of Albany in Linn County, Oregon. BPA is proposing to grant a new Point of Delivery to CPI at this substation. The purpose of the project is to serve the developing industrial needs in the Marion Industrial Park and on the 550 acres of nearby land within CPI's service area that are zoned for residential use. CPI prepared, and the Rural Electrification Administration (REA) has approved a Borrower's Environmental Report (BER) which addresses this action along with several other proposed projects in the CPI service area. Portions of this BER are summarized in this brief EA. BPA is preparing its own EA since Department of Energy National Environmental Policy Act (NEPA) guidelines require additional environmental concerns to be addressed than are required by REA's NEPA guidelines

  9. Analysis of the 35 KV substation secondary system

    Science.gov (United States)

    Zhao, Yong; Jiang, Jianguo; Jiang, Chunlei; Ren, Shuang; Liu, Songbin

    2017-04-01

    This paper analyzes the status of the two system of some 35KV users' substation in Daqing oil field, the deficiencies of the two system of the existing 35KV substation are found out. And put forward the opinion of acceptance in the future work. I hope it can able to work in the future on the protection of professional help.

  10. Solar-Assisted Electric Vehicle Charging Station Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Lapsa, Melissa Voss [ORNL; Durfee, Norman [ORNL; Maxey, L Curt [ORNL; Overbey, Randall M [ORNL

    2011-09-01

    Oak Ridge National Laboratory (ORNL) has been awarded $6.8 million in the Department of Energy (DOE) American Recovery and Reinvestment Act (ARRA) funds as part of an overall $114.8 million ECOtality grant with matching funds from regional partners to install 125 solar-assisted Electric Vehicle (EV) charging stations across Knoxville, Nashville, Chattanooga, and Memphis. Significant progress has been made toward completing the scope with the installation of 25 solar-assisted charging stations at ORNL; six stations at Electric Power Research Institute (EPRI); and 27 stations at Nissan's Smyrna and Franklin sites, with three more stations under construction at Nissan's new lithium-ion battery plant. Additionally, the procurement process for contracting the installation of 34 stations at Knoxville, the University of Tennessee Knoxville (UTK), and Nashville sites is underway with completion of installation scheduled for early 2012. Progress is also being made on finalizing sites and beginning installations of 30 stations in Nashville, Chattanooga, and Memphis by EPRI and Tennessee Valley Authority (TVA). The solar-assisted EV charging station project has made great strides in fiscal year 2011. A total of 58 solar-assisted EV parking spaces have been commissioned in East and Middle Tennessee, and progress on installing the remaining 67 spaces is well underway. The contract for the 34 stations planned for Knoxville, UTK, and Nashville should be underway in October with completion scheduled for the end of March 2012; the remaining three Nissan stations are under construction and scheduled to be complete in November; and the EPRI/TVA stations for Chattanooga, Vanderbilt, and Memphis are underway and should be complete by the end of March 2012. As additional Nissan LEAFs are being delivered, usage of the charging stations has increased substantially. The project is on course to complete all 125 solar-assisted EV charging stations in time to collect meaningful data

  11. Development of 3 D Electric Field Analysis Program under Power System Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Myung, S. H.; Lee, K. C.; Lee, J. B.; Ha, T. H. [Korea Electrotechnology Research Institute, Changwon (Korea, Republic of)

    1996-12-01

    Recently, as the effects of electric fields on animals, human beings and sensitive equipment have been reported, the study on electric fields has become more important. Transmission lines and substation among power facilities are dominant parts related to electrical environment. Electric field analysis of transmission line has been made using image charge method or CSM since 1970`s, however electric field analysis in substation has been rarely studied due to the complexity of three dimensional evaluation of an electric field in substation. For the rather complicated and time-consuming three-dimensional electric field calculation in the vicinity of transmission lines and substations, this study proposes an effective numerical calculation method based on Charge Simulation Method(CSM). In order to represent non-uniform charge distribution on an electrode better, it is subdivided into small segments with linear charge density. Each segment with linear charge density can be easily represented by a generalized finite line type of charge whose expressions for potential and electric field were analytically derived and which was named {sup f}inite slant line charge in this study. As for the arrangement of small segments of a subdivided electrode, it has been found that unequally spaced arrangement method is superior to equally spaced one. In order to arrange segments fast and effectively, effective formulas were derived from multiple regression analysis of many simulations. The proposed method is applied to the electric field calculation around the transmission lines with significant change in direction and substation busbars. (author). refs., figs., tabs.

  12. Substation Location in Offshore Wind Farms - A Planar Multi-Facility Location-Routing Problem

    OpenAIRE

    Amland, Thomas

    2014-01-01

    In offshore wind farms, two important parts of the design are to determine locations for substations and a cabling layout that connects every turbine to a substation. These problems are interconnected, as the cable layout depends on the choice of location for the substation. In this thesis we investigate how to set the location of substations such that the total cable cost is minimized.

  13. Assessment of the risk of failure of high voltage substations due to environmental conditions and pollution on insulators.

    Science.gov (United States)

    Castillo Sierra, Rafael; Oviedo-Trespalacios, Oscar; Candelo, John E; Soto, Jose D

    2015-07-01

    Pollution on electrical insulators is one of the greatest causes of failure of substations subjected to high levels of salinity and environmental pollution. Considering leakage current as the main indicator of pollution on insulators, this paper focuses on establishing the effect of the environmental conditions on the risk of failure due to pollution on insulators and determining the significant change in the magnitude of the pollution on the insulators during dry and humid periods. Hierarchical segmentation analysis was used to establish the effect of environmental conditions on the risk of failure due to pollution on insulators. The Kruskal-Wallis test was utilized to determine the significant changes in the magnitude of the pollution due to climate periods. An important result was the discovery that leakage current was more common on insulators during dry periods than humid ones. There was also a higher risk of failure due to pollution during dry periods. During the humid period, various temperatures and wind directions produced a small change in the risk of failure. As a technical result, operators of electrical substations can now identify the cause of an increase in risk of failure due to pollution in the area. The research provides a contribution towards the behaviour of the leakage current under conditions similar to those of the Colombian Caribbean coast and how they affect the risk of failure of the substation due to pollution.

  14. Substation automation. Integration of applications of the SICLE; Automatizacion de subestaciones. Integracion de aplicaciones sobre el SICLE

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, Gustavo; Vega, Miguel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    This paper presents the first applications developed by the Instituto de Investigaciones Electricas (IIE) on the infrastructure of the SICLE (Sistema de Informacion y Control Local de la Estacion) (Station Information and Local Control System), that Comision Federal de Electricidad (CFE) is now acquiring in order to automate its transmission substations. A computer infrastructure was obtained similar to the existing in the substation for the development of program testing at the IIE; the personnel of the same was trained; the applications in conjunction with the CFE specialists were defined; the agreed developments were made and installed at the Temascal II Substation. [Espanol] En el presente articulo se presentan las primeras aplicaciones desarrolladas por el Instituto de Investigaciones Electricas (IIE) sobre la infraestructura del SICLE (Sistema de Informacion y Control Local de Estacion) que esta adquiriendo la Comision Federal de Electricidad (CFE) a fin de automatizar sus subestaciones de transmision. Se obtuvo una infraestructura de computo similar a la existente en la subestacion para el desarrollo de prueba de programas en el IIE; se capacito al personal en la misma; se definieron las aplicaciones conjuntamente con los especialistas de la CFE; se hicieron los desarrollos acordados y se instalaron en la subestacion Temascal II.

  15. Substation automation. Integration of applications of the SICLE; Automatizacion de subestaciones. Integracion de aplicaciones sobre el SICLE

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, Gustavo; Vega, Miguel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    This paper presents the first applications developed by the Instituto de Investigaciones Electricas (IIE) on the infrastructure of the SICLE (Sistema de Informacion y Control Local de la Estacion) (Station Information and Local Control System), that Comision Federal de Electricidad (CFE) is now acquiring in order to automate its transmission substations. A computer infrastructure was obtained similar to the existing in the substation for the development of program testing at the IIE; the personnel of the same was trained; the applications in conjunction with the CFE specialists were defined; the agreed developments were made and installed at the Temascal II Substation. [Espanol] En el presente articulo se presentan las primeras aplicaciones desarrolladas por el Instituto de Investigaciones Electricas (IIE) sobre la infraestructura del SICLE (Sistema de Informacion y Control Local de Estacion) que esta adquiriendo la Comision Federal de Electricidad (CFE) a fin de automatizar sus subestaciones de transmision. Se obtuvo una infraestructura de computo similar a la existente en la subestacion para el desarrollo de prueba de programas en el IIE; se capacito al personal en la misma; se definieron las aplicaciones conjuntamente con los especialistas de la CFE; se hicieron los desarrollos acordados y se instalaron en la subestacion Temascal II.

  16. Emissions from coal-fired electric stations : environmental health effects and reduction options

    International Nuclear Information System (INIS)

    Love, P.; Lourie, B.; Pengelly, D.; Labatt, S.; Ogilvie, K.; Kelly, B.

    1998-01-01

    Findings of a study on the environmental effects of current emissions from coal-fired electric stations were summarized. Current and projected emissions from coal-fired electric stations for five emission reduction scenarios were estimated for Ontario, Eastern Canada, Ohio Valley/Great Lakes, and the U.S. northeast regions. Coal-fired electric stations generate a wide range of environmentally significant air emissions. The five pollutants selected - sulphur dioxide, nitrogen oxides, particulate matter (less than 10 micrometres in size), mercury, and carbon dioxide - are considered to impact most on environmental health. This report focused on 312 coal-fired electric stations in the regions named above. They were selected based on the likelihood that long-range transport of the emissions from these coal-fired utilities would have an impact on human health and the environment. 55 refs., 10 tabs., 8 figs

  17. Electricity Delivery and its Environmental Impacts

    Science.gov (United States)

    Explains electricity delivery in the U.S. and its impacts on the environment. After a centralized power plant generates electricity, the electricity must be delivered to the end-user. Follow the path of electricity through transmission, substation, and dis

  18. Optimal Allocation of Smart Substations in a Distribution System Considering Interruption Costs of Customers

    DEFF Research Database (Denmark)

    Sun, Lei; You, Shi; Hu, Junjie

    2016-01-01

    number and allocation of smart substations in a given distribution system is presented, with the upgrade costs of substations and the interruption costs of customers taken into account. Besides, the reliability criterion is also properly considered in the model. By linearization strategies, the SSAM......One of the major functions of a smart substation (SS) is to restore power supply to interrupted customers as quickly as possible after an outage. The high cost of a smart substation limits its widespread utilization. In this paper, a smart substation allocation model (SSAM) to determine the optimal...

  19. Maintenance Optimization of High Voltage Substation Model

    Directory of Open Access Journals (Sweden)

    Radim Bris

    2008-01-01

    Full Text Available The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being optimized, the failure rate and mean time to repair - MTTR.

  20. Electricity supplies in a French nuclear power station

    International Nuclear Information System (INIS)

    2011-01-01

    As the operation of a nuclear power station requires a power supply system enabling this operation as well as the installation safety, this document describes how such systems are designed in the different French nuclear power stations to meet the requirements during a normal operation (when the station produces electricity) or when it is stopped, but also to ensure power supply to equipment ensuring safety functions during an incident or an accident occurring on the installation. More precisely, these safety functions are provided by two independent systems in the French nuclear power stations. Their operation is briefly described. Two different types of nuclear reactors are addressed: pressurised water reactors (PWR) of second generation, EPR (or PWR of third generation)

  1. The San Bernabe power substation; La subestacion San Bernabe

    Energy Technology Data Exchange (ETDEWEB)

    Chavez Sanudo, Andres D. [Luz y Fuerza del Centro, Mexico, D. F. (Mexico)

    1997-12-31

    The first planning studies that gave rise to the San Bernabe substation go back to year 1985. The main circumstance that supports this decision is the gradual restriction for electric power generation that has been suffering the Miguel Aleman Hydro System, until its complete disappearance, to give priority to the potable water supply through the Cutzamala pumping system, that feeds in an important way Mexico City and the State of Mexico. In this document the author describes the construction project of the San Bernabe Substation; mention is made of the technological experiences obtained during the construction and its geographical location is shown, as well as the one line diagram of the same [Espanol] Los primeros estudios de planeacion que dieron origen a la subestacion San Bernabe se remontan al ano de 1985. La circunstancia principal que soporta esta decision es la restriccion paulatina para generar energia que ha venido experimentando el Sistema Hidroelectrico Miguel Aleman, hasta su desaparicion total, para dar prioridad al suministro de agua potable por medio del sistema de bombeo Cutzamala, que alimenta en forma importante a la Ciudad de Mexico y al Estado de Mexico. En este documento el autor describe el proyecto de construccion de la subestacion San Bernabe; se mencionan las experiencias tecnologicas obtenidas durante su construccion y se ilustra su ubicacion geografica, asi como un diagrama unifilar de la misma

  2. 30 CFR 77.811 - Movement of portable substations and transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of portable substations and transformers. 77.811 Section 77.811 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.811 Movement of portable substations...

  3. On the legal nature of electricity supply contracts concluded by electricity companies and power stations generating electricity from renewable energy sources

    International Nuclear Information System (INIS)

    Herrmann, B.J.

    1998-01-01

    Section 2 of the German Act for enhanced use of electricity from renewable energy sources (StEG) defines the obligation to contract but not the contractual obligations, i.e. the conditions of performance of the contract (supply and purchase of electricity and the legal obligations of contractors). The analysis here shows that characterising this mandatory contract required by the act as an agreement of purchase and sale more appropriately describes the legal nature of the contract and the intent of the legislator than other contracts for supply and purchase of electricity, as for instance those concluded by electric utilities and their customers. One specific aspect elaborated by the author is that the StEG does not constitute an obligation to supply on the part of the renewable energy generating power station, so that the power station operator is not obliged to ensure availability of the electricity at any time or in terms of supplies that can be called off by the purchasing utility, whereas the electric utility is obliged by section 2 of the StEG to purchase the contractual amounts from the generating station. (orig./CB) [de

  4. Practical experience with IEEE 1588 high precision time synchronization in electrical substation based on IEC 61850 process bus

    Energy Technology Data Exchange (ETDEWEB)

    Moore, R.; Goraj, M.J.; McGhee, J. [RuggedCom Inc., Concord, ON (Canada)

    2010-07-01

    This paper discussed a time synchronization and dynamic multicast filtering procedure conducted on an IEC 61850 process bus. The Institute of Electrical and Electronic (IEEE) 1588 time synchronization and dynamic multicast filtering procedure was conducted at a substation equipped with non-conventional instrument transformers (NCIT) and intelligent circuit breakers. The process bus interconnected IEDs within a bay that included a real time sampled value (SV) measurement system. The system was designed to reduce the use of copper wiring and to eliminate high energy signal processes. Digitized sampled measured values were sent from the electronic instrument transformers to protect and control relays. A merging unit was used to enable the transmission of the digitized current and voltage measurements across an ethernet network. Two sampling rates were supplied for power system monitoring and protection applications. The merging units continuously sent sampling values of current and voltages acquired from primary equipment. Precision time protocol systems were discussed, and issues related to time synchronization were reviewed. A network topology was provided. 4 refs., 4 figs.

  5. A health examination of railway high-voltage substation workers exposed to ELF electromagnetic fields.

    Science.gov (United States)

    Baroncelli, P; Battisti, S; Checcucci, A; Comba, P; Grandolfo, M; Serio, A; Vecchia, P

    1986-01-01

    This is a cross-sectional survey on the health conditions of railways workers active in 258 interconnection and conversion substations all over Italy. Measurements performed in both kinds of substations operating at 220 kV have shown that maximum levels of the electric field strength and of the magnetic flux density at 50 Hz are of the order of 5 kV/m and 15 microT, respectively. Three subject groups, differently exposed (1, 10, 20 h/week), and an unexposed control group, for a total number of 627 workers, constitute the population at study. All subjects underwent a general medical examination, laboratory investigations, and a series of selected examinations relative to three systems (nervous, cardiovascular, and haematopoietic) considered at higher risk. No differences have been found between the exposed and the control groups. It is concluded that workers exposed to ELF electromagnetic fields of moderate strength do not show the presence of clear effects on their state of health.

  6. Electric vehicle station equipment for grid-integrated vehicles

    Science.gov (United States)

    Kempton, Willett; Kiamilev, Fouad; McGee, Rodney; Waite, Nick

    2017-09-05

    Methods, systems, and apparatus transferring power between the grid and an electric vehicle are disclosed. The apparatus may include at least one vehicle communication port for interfacing with electric vehicle equipment (EVE) and a processor coupled to the at least one vehicle communication port to establish communication with the EVE, receive EVE attributes from the EVE, and transmit electric vehicle station equipment (EVSE) attributes to the EVE. Power may be transferred between the grid and the electric vehicle by maintaining EVSE attributes, establishing communication with the EVE, and transmitting the EVSE maintained attributes to the EVE.

  7. Electrical supervisory control and data acquisition system for Power Reactor Fuel Reprocessing Facility (PREFRE-II) at Tarapur

    International Nuclear Information System (INIS)

    Singh, V.K.; Kaushik, S.; Haneef, K.K.M.

    2014-01-01

    Power Reactor Fuel Reprocessing Facility (PREFRE II) is a radio-chemical plant located at Tarapur. The electric power supply to PREFRE-II plant has been provided from a 33 KV Sub-station located in PREFRE-II complex to meet the O and M requirement of plant. The major equipment of the substation includes HT switch board, dry type transformer, LT switch board, Diesel Generator (DG) set and Un-interrupted Power Supply (UPS) System. The power supply to the plant is provided at 415 V voltage level with the help of Power Distribution Boards (PDBs) and Motor Control Centres (MCCs) located at different floors of the plant. The parameters of the electrical equipment of substation and plant are recorded in each shift in the log-book, manually by the operator. To maintain the log-book, the operator needs to go closer to the individual equipment in radioactive area of the plant to read the parameters. The log-book method of monitoring is a cumbersome method and does not include fault event records, trends and diagnostic behavior of the equipment. Electrical Supervisory Control and Data Acquisition (E-SCADA) system has been increasingly used in Nuclear Power Plants (NPPs) for control and monitoring of electrical parameters of plant and switchyard equipment. E-SCADA system has been designed, developed and implemented for PREFRE-II plant for remote monitoring of parameters of electrical equipment. E-SCADA system provides monitoring of electrical equipment and renders complete guidance and information with the help of Graphical User Interface (GUI) to the operator to take necessary action during normal and abnormal conditions. E-SCADA with intelligent communication features helps in reducing cabling from field equipment which enhances the fire safety of plant. As a result engineering, operation and maintenance efforts for monitoring are reduced considerably in terms of requirement of skilled man power and accurate data logging of electrical parameters. This system also helps to

  8. Fast substation service restoration using intelligent petri-nets models

    Energy Technology Data Exchange (ETDEWEB)

    Yang, H.T.; Peng, P.C.; Jiang, H.L. [Chung Yuan Christian Univ., Chung Li, Taiwan (China)

    2006-07-01

    Service restoration of a substation is a stressful and immediate task that must be conducted by system operators following a blackout. Operators, including those of Taiwan Power Company (TPC), normally restore power loads on the basis of their past experiences and engineering heuristics. Due to the significant number of switching operations to be evaluated, a computer-aided decision support system can be quite valuable. In distribution system automation, installation of unmanned substations requires an automated restoration computer system to rapidly devise a switching plan after a fault event. The modeling technique of Petri Nets (PNs) encompasses fault diagnosis of distribution systems, protective scheming of relays, and generic restoration schedule of power transmission systems. Knowledge or configuration about the system concerned can be expressed systematically through a structured model with parallelism and synchronization. This paper proposed a new PNs knowledge representation scheme to achieve a fast, on-line service restoration plan of a substation. The paper described the task of service restoration in a substation as well as the heuristic rules adopted by the dispatchers of the TPC distribution systems. The paper also introduced the topic of Typical PN properties and the proposed matrix operations for PNs reasoning. The proposed basic PNs model for service restoration on the basis of the engineering heuristics were also identified. It was concluded that the proposed approach not only facilitated software programming, but was highly adaptive to the extension or maintenance of the developed programs, arising from the changes of the substation configuration. 18 refs., 1 tab., 8 figs.

  9. Implementation and design of a communication system of an agent-based automated substation

    Institute of Scientific and Technical Information of China (English)

    LIN Yong-jun; LIU Yu-tao; ZHANG Dan-hui

    2006-01-01

    A substation system requires that communication be transmitted reliably,accurately and in real-time.Aimed at solving problems,e.g.,flow confliction and sensitive data transmission,a model of the communication system of an agent-based automated substation is introduced.The running principle is discussed in detail and each type of agent is discussed further.At the end,the realization of the agent system applied to the substation is presented.The outcome shows that the communication system of an agent-based automated substation improves the accuracy and reliability of the data transfer and presents it in realtime.

  10. Mini hydro electric power stations Lukar 1,2,3,4: Public enterprise (JP) Komunalec

    International Nuclear Information System (INIS)

    Stojanova, Blagica

    2004-01-01

    The role of the Public enterprises in improving entire living conditions of the citizens, not only by its services towards the citizenship such as: water supplying and public hygiene but the opportunity to produce the electric power by the Mini hydro electric-power stations built on the main city water supply pipes. The paper presents experiences of building the mini hydro electric power stations Lukar 1,2,3,4. The successful completion of this project should be a motivation for building more electric power stations because there are great water potential in the Republic of Macedonia i.e. there have been recorded more than a hundred places suitable for construction of power electric stations. This will contribute not only for clean ecological energy but will have a direct influence on the total economic development of the Republic of Macedonia. (Author)

  11. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  12. Optimal Charging Schedule Planning and Economic Analysis for Electric Bus Charging Stations

    Directory of Open Access Journals (Sweden)

    Rong-Ceng Leou

    2017-04-01

    Full Text Available The battery capacity of electric buses (EB used for public transportation is greater than that of electric cars, and the charging power is also several times greater than that used in electric cars; this can result in high energy consumption and negatively impact power distribution networks. This paper proposes a framework to determine the optimal contracted power capacity and charging schedule of an EB charging station in such a way that energy costs can be reduced. A mathematical model of controlled charging, which includes the capacity and energy charges of the station, was developed to minimize costs. The constraints of the model include the charging characteristics of an EB and the operational guidelines of the bus company. A practical EB charging station was used to verify the proposed model. The financial viability of this EB charging station is also studied in this paper. The economic analysis model for this charging station considers investment and operational costs, and the operational revenue. Sensitivity analyses with respect to some key parameters are also performed in this paper. Based on actual operational routes and EB charging schemes, test results indicate that the EB charging station investment is feasible, and the planning model proposed can be used to determine optimal station power capacity and minimize energy costs.

  13. Perspective loads of transformer substations at development of urban power supply systems

    Directory of Open Access Journals (Sweden)

    Svetlana Guseva

    2012-06-01

    Full Text Available In work the system approach to formation of the urban power supply system is given. The hierarchical structure of the construction, voltage levels and load densities is considered. The mathematical and geometrical modeling of service areas for transformer substations of diff erent voltage is fulfi lled. Determination of perspective loads of transformer substations is given. The method of graphic placement of transformer substations in the city territory for new substations at existing structure of networks is off ered. The calculation program Microsoft EXCEL and the graphic program AutoCad are used for realization of method. The method allows fi nding a rational decision for the development of urban power supply system on the beginning design stages in conditions of the information uncertainty.

  14. Advances in the diagnosis of substations primary equipment by means of high sensitivity techniques; Avances en el diagnostico de equipo primario de subestaciones mediante tecnicas de alta sensibilidad

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Colon H, V. Rodolfo; Nava G, J. Armando; Azcarraga R, Carlos G [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2005-07-01

    In an electrical system, the substations primary equipment is integrated by the power transformers, the instrument transformers, the breakers and the interconnection circuits (energy cables). At the present time, the described primary equipment has been integrated in an arrangement denominated encapsulated substation that presents dimensional and aesthetic advantages in the conventional substations. Nevertheless, the isolation involved in this type of substations means new challenges when carrying out its diagnosis in a planned way or after the appearance of a fault. In this sense, the insulating and electromechanical system of the primary equipment of substations must be evaluated in a programmed way or be constantly monitored. This with the final purpose of detecting incipient problems that could evolve towards a fault or to the diminution of the electrical system reliability. [Spanish] En un sistema electrico, el equipo primario de subestaciones esta integrado por los transformadores de potencia, los transformadores de instrumento, los interruptores y los circuitos de interconexion (cables de energia). En la actualidad, el equipo primario descrito se ha integrado en un arreglo denominado subestacion encapsulada que presenta ventajas dimensionales y esteticas sobre las subestaciones convencionales. Sin embargo, el aislamiento involucrado en este tipo de subestaciones significa nuevos retos al efectuar su diagnostico de manera planeada o despues de presentarse una falla. En este sentido, el sistema aislante y electromecanico del equipo primario de subestaciones debe ser evaluado de manera programada o monitoreado constantemente. Ello con la finalidad de detectar problemas incipientes que pudieran evolucionar hacia una falla o la disminucion de la confiabilidad del sistema electrico.

  15. Experimental adoption of RCM in EDF substations

    International Nuclear Information System (INIS)

    Heroin, G.; Aupied, J.; Sanchis, G.

    1995-12-01

    EDF, after testing Reliability Centred Maintenance (RCM) on systems used in nuclear power plants, has now successfully extended RCM to all of its nuclear power plants. In the light of this experience, EDF has committed itself to a pilot study on a line bay of a 400 kV substation in 1992. The RCM method as applied benefited from EDF's policy of maintenance, introduced five years ago on all substations, which has enhanced prospects of reliability. The original feature in the selection of maintenance tasks was that it brought into play two criteria for failure assessment: frequency and seriousness, and two criteria for maintenance task selection: efficiency and facility. (author)

  16. Lessons Learned "Establishing an Electrically Safe Work Condition" Specifically related to Racking Electrical Breakers

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, Tommy Robert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Romero, Philbert Roland [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Garcia, Samuel Anthony [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-11-09

    During low voltage electrical equipment maintenance, a bad breaker was identified. The breaker was racked out from the substation cubicle without following the hazardous energy control process identified in the Integrated Work Document (IWD). The IWD required the substation to be in an electrically safe work condition prior to racking the breaker. Per NFPA 70E requirements, electrical equipment shall be put into an electrically safe work condition before an employee performs work on or interacts with equipment in a manner that increases the likelihood of creating an arc flash. Racking in or out a breaker on an energized bus may increase the likelihood of creating an arc flash dependent on equipment conditions. A thorough risk assessment must be performed prior to performing such a task. The risk assessment determines the risk control measures to be put in place prior to performing the work. Electrical Safety Officers (ESO) can assist in performing risk assessments and incorporating risk control measures.

  17. Electrical distribution studies for the 200 Area tank farms

    International Nuclear Information System (INIS)

    Fisler, J.B.

    1994-01-01

    This is an engineering study providing reliability numbers for various design configurations as well as computer analyses (Captor/Dapper) of the existing distribution system to the 480V side of the unit substations. The objective of the study was to assure the adequacy of the existing electrical system components from the connection at the high voltage supply point through the transformation and distribution equipment to the point where it is reduced to its useful voltage level. It also was to evaluate the reasonableness of proposed solutions of identified deficiencies and recommendations of possible alternate solutions. The electrical utilities are normally considered the most vital of the utility systems on a site because all other utility systems depend on electrical power. The system accepts electric power from the external sources, reduces it to a lower voltage, and distributes it to end-use points throughout the site. By classic definition, all utility systems extend to a point 5 feet from the facility perimeter. An exception is made to this definition for the electric utilities at this site. The electrical Utility System ends at the low voltage section of the unit substation, which reduces the voltage from 13.8 kV to 2,400, 480, 277/480 or 120/208 volts. These transformers are located at various distances from existing facilities. The adequacy of the distribution system which transports the power from the main substation to the individual area substations and other load centers is evaluated and factored into the impact of the future load forecast

  18. Electrical distribution studies for the 200 Area tank farms

    Energy Technology Data Exchange (ETDEWEB)

    Fisler, J.B.

    1994-08-26

    This is an engineering study providing reliability numbers for various design configurations as well as computer analyses (Captor/Dapper) of the existing distribution system to the 480V side of the unit substations. The objective of the study was to assure the adequacy of the existing electrical system components from the connection at the high voltage supply point through the transformation and distribution equipment to the point where it is reduced to its useful voltage level. It also was to evaluate the reasonableness of proposed solutions of identified deficiencies and recommendations of possible alternate solutions. The electrical utilities are normally considered the most vital of the utility systems on a site because all other utility systems depend on electrical power. The system accepts electric power from the external sources, reduces it to a lower voltage, and distributes it to end-use points throughout the site. By classic definition, all utility systems extend to a point 5 feet from the facility perimeter. An exception is made to this definition for the electric utilities at this site. The electrical Utility System ends at the low voltage section of the unit substation, which reduces the voltage from 13.8 kV to 2,400, 480, 277/480 or 120/208 volts. These transformers are located at various distances from existing facilities. The adequacy of the distribution system which transports the power from the main substation to the individual area substations and other load centers is evaluated and factored into the impact of the future load forecast.

  19. Fuzzy logic based ELF magnetic field estimation in substations

    International Nuclear Information System (INIS)

    Kosalay, I.

    2008-01-01

    This paper examines estimation of the extremely low frequency magnetic fields (MF) in the power substation. First, the results of the previous relevant research studies and the MF measurements in a sample power substation are presented. Then, a fuzzy logic model based on the geometric definitions in order to estimate the MF distribution is explained. Visual software, which has a three-dimensional screening unit, based on the fuzzy logic technique, has been developed. (authors)

  20. Network Multifunctional Substation with Embedded System in Coal Mine

    Institute of Scientific and Technical Information of China (English)

    MENG Fan-rong; HUO Yan; ZHOU Yong

    2006-01-01

    In order to solve the problems of mining monitor and control systems during the construction process of digital mining combined with network and embedded technologies, the kernel access equipment of a mining monitor and control system was proposed and designed. It is the architecture of a mining embedded network multifunctional substation. This paper presents the design of hardware and software of the substation in detail. Finally, the system's efficiency was validated through experimentation.

  1. Business Models for Solar Powered Charging Stations to Develop Infrastructure for Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Jessica Robinson

    2014-10-01

    Full Text Available Electric power must become less dependent on fossil fuels and transportation must become more electric to decrease carbon emissions and mitigate climate change. Increasing availability and accessibility of charging stations is predicted to increase purchases of electric vehicles. In order to address the current inadequate charging infrastructure for electric vehicles, major entities must adopt business models for solar powered charging stations (SPCS. These SPCS should be located in parking lots to produce electricity for the grid and provide an integrated infrastructure for charging electric vehicles. Due to the lack of information related to SPCS business models, this manuscript designs several models for major entities including industry, the federal and state government, utilities, universities, and public parking. A literature review of the available relevant business models and case studies of constructed charging stations was completed to support the proposals. In addition, a survey of a university’s students, staff, and faculty was conducted to provide consumer research on people’s opinion of SPCS construction and preference of business model aspects. Results showed that 69% of respondents would be more willing to invest in an electric vehicle if there was sufficient charging station infrastructure at the university. Among many recommendations, the business models suggest installing level 1 charging for the majority of entities, and to match entities’ current pricing structures for station use. The manuscript discusses the impacts of fossil fuel use, and the benefits of electric car and SPCS use, accommodates for the present gap in available literature on SPCS business models, and provides current consumer data for SPCS and the models proposed.

  2. A modular Space Station/Base electrical power system - Requirements and design study.

    Science.gov (United States)

    Eliason, J. T.; Adkisson, W. B.

    1972-01-01

    The requirements and procedures necessary for definition and specification of an electrical power system (EPS) for the future space station are discussed herein. The considered space station EPS consists of a replaceable main power module with self-contained auxiliary power, guidance, control, and communication subsystems. This independent power source may 'plug into' a space station module which has its own electrical distribution, control, power conditioning, and auxiliary power subsystems. Integration problems are discussed, and a transmission system selected with local floor-by-floor power conditioning and distribution in the station module. This technique eliminates the need for an immediate long range decision on the ultimate space base power sources by providing capability for almost any currently considered option.

  3. Application of Service Oriented Architecture for Sensors and Actuators in District Heating Substations

    Science.gov (United States)

    Gustafsson, Jonas; Kyusakov, Rumen; Mäkitaavola, Henrik; Delsing, Jerker

    2014-01-01

    Hardwired sensor installations using proprietary protocols found in today's district heating substations limit the potential usability of the sensors in and around the substations. If sensor resources can be shared and re-used in a variety of applications, the cost of sensors and installation can be reduced, and their functionality and operability can be increased. In this paper, we present a new concept of district heating substation control and monitoring, where a service oriented architecture (SOA) is deployed in a wireless sensor network (WSN), which is integrated with the substation. IP-networking is exclusively used from sensor to server; hence, no middleware is needed for Internet integration. Further, by enabling thousands of sensors with SOA capabilities, a System of Systems approach can be applied. The results of this paper show that it is possible to utilize SOA solutions with heavily resource-constrained embedded devices in contexts where the real-time constrains are limited, such as in a district heating substation. PMID:25196165

  4. An application of data mining in district heating substations for improving energy performance

    Science.gov (United States)

    Xue, Puning; Zhou, Zhigang; Chen, Xin; Liu, Jing

    2017-11-01

    Automatic meter reading system is capable of collecting and storing a huge number of district heating (DH) data. However, the data obtained are rarely fully utilized. Data mining is a promising technology to discover potential interesting knowledge from vast data. This paper applies data mining methods to analyse the massive data for improving energy performance of DH substation. The technical approach contains three steps: data selection, cluster analysis and association rule mining (ARM). Two-heating-season data of a substation are used for case study. Cluster analysis identifies six distinct heating patterns based on the primary heat of the substation. ARM reveals that secondary pressure difference and secondary flow rate have a strong correlation. Using the discovered rules, a fault occurring in remote flow meter installed at secondary network is detected accurately. The application demonstrates that data mining techniques can effectively extrapolate potential useful knowledge to better understand substation operation strategies and improve substation energy performance.

  5. Development of advanced methods for planning electric energy distribution systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goenen, T.; Foote, B.L.; Thompson, J.C.; Fagan, J.E.

    1979-10-01

    An extensive search was made for the identification and collection of reports published in the open literature which describes distribution planning methods and techniques. In addition, a questionnaire has been prepared and sent to a large number of electric power utility companies. A large number of these companies were visited and/or their distribution planners interviewed for the identification and description of distribution system planning methods and techniques used by these electric power utility companies and other commercial entities. Distribution systems planning models were reviewed and a set of new mixed-integer programming models were developed for the optimal expansion of the distribution systems. The models help the planner to select: (1) optimum substation locations; (2) optimum substation expansions; (3) optimum substation transformer sizes; (4) optimum load transfers between substations; (5) optimum feeder routes and sizes subject to a set of specified constraints. The models permit following existing right-of-ways and avoid areas where feeders and substations cannot be constructed. The results of computer runs were analyzed for adequacy in serving projected loads within regulation limits for both normal and emergency operation.

  6. Decentralized substations for low-temperature district heating with no Legionella risk, and low return temperatures

    International Nuclear Information System (INIS)

    Yang, Xiaochen; Li, Hongwei; Svendsen, Svend

    2016-01-01

    To improve energy efficiency and give more access to renewable energy sources, low-temperature district heating (LTDH) is a promising concept to be realized in the future. However, concern about Legionella proliferation restricts applying low-temperature district heating in conventional systems with domestic hot water (DHW) circulation. In this study, a system with decentralized substations was analysed as a solution to this problem. Furthermore, a modification for the decentralized substation system were proposed in order to reduce the average return temperature. Models of conventional system with medium-temperature district heating, decentralized substation system with LTDH, and innovative decentralized substation system with LTDH were built based on the information of a case building. The annual distribution heat loss and the operating costs of the three scenarios were calculated and compared. From the results, realizing LTDH by the decentralized substation unit, 30% of the annual distribution heat loss inside the building can be saved compared to a conventional system with medium-temperature district heating. Replacing the bypass pipe with an in-line supply pipe and a heat pump, the innovative decentralized substation system can reduce distribution heat loss by 39% compared to the conventional system and by 12% compared to the normal decentralized substation system with bypass. - Highlights: • The system of decentralized substations can realize low-temperature district heating without running the risk of Legionella. • Decentralized substations help reduce the distribution heat loss inside the building compared to conventional system. • A new concept that can reduce the return temperature for district heating is proposed and analysed.

  7. MFTF 230 kV pulsed power substation

    International Nuclear Information System (INIS)

    Wilson, J.H.

    1979-01-01

    The Mirror Fusion Test Facility (MFTF) currently under construction at the Lawrence Livermore Laboratory includes a Sustaining Neutral Beam Power Supply System (SNBPSS) consisting of 24 power-supply sets. The System will operate in long pulses (initially .5 seconds and eventually 30 seconds) at high power (200 MW), which will necessitate a large source of ac power. To meet this requirement, a new 230-kV substation is also being built at LLL. The constraints of cost, equipment protection, short operating lifetime (10 years), and reliability dictated a unique substation design. Its unusual features include provisions for fast fault detection and tripping, a capability for limiting ground fault current, low impedance, and economical design

  8. Environmental qualification test of electrical penetration for nuclear power stations

    International Nuclear Information System (INIS)

    Kooziro, Tetsuya; Nakagawa, Akitoshi; Toyoda, Shigeru; Uno, Shunpei

    1979-01-01

    Environmental qualification test was conducted according to IEEE Std. 323-1974 in order to evaluate the safety and reliability of electrical penetration of PWR type nuclear power station. Electrical penetration is the assemblies of electric cables attached to the containment vessel and penetrate through the vessel. Since it is a part of the vessel, it is deemed to be one of the primary safety equipments that are important for the safety and reliability of nuclear power stations. Environmental tests were conducted continuously as to heat cycle, vibration and LOCA with the full size specimens of bushing type, pigtail type and triaxial cable type and at the same time thermal life and irradiation tests were conducted on the insulation materials used, in order to obtain the comprehensive evaluation of their electrical and mechanical characteristics. As the result, they all satisfied the requirements for the circuits for actual use during and after various environmental qualification tests according to IEEE Std. 323. (author)

  9. TWRS privatization phase 1 electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    This document includes Conceptual Design Report (CDR) for a new 11 km (7 miles) 230 kV transmission line and a new 40 MVA substation (A6) which will be located east of Grout Facility in 200E Area tank farm. This substation will provide electrical power up to 20 MW each for two private contractor facilities for immobilization and disposal of low activity waste (LAW)

  10. Simulation of the electric systems of the Laguna Verde nuclear power station; Simulacion de los sistemas electricos de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez Lozano, Saul; Ruiz Ponce, Gerardo E [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1992-03-01

    In this article, the electric system models of the Laguna Verde Nuclear Power Station (CNLV) simulator, are presented. These models permit the functioning simulation, in the different operation modes of the main generator (Ruiz and Rodriguez 1991a), of the auxiliaries system and of the substation (Ruiz and Rodriguez 1991b), and of the emergency diesel generators system (Ruiz and Rodriguez 1991c). The general characteristics of such systems, considered as the basis to obtain the representative models, which were developed as modules in an independent way to be integrated in the simulator, are also described. [Espanol] En este articulo, se presenta los modelos de los sistemas electricos del simulador de la Central Laguna Verde (CLV). Estos modelos permiten simular el funcionamiento, en los diferentes modos de operacion del generador principal (Ruiz y Rodriguez, 1991a), del sistema de auxiliares y de la subestacion (Ruiz y Rodriguez, 1991b) y del sistema de generadores diesel de emergencia (Ruiz y Rodriguez, 1991c). Asimismo, se describen las caracteristicas generales de tales sistemas, consideradas como la base para obtener los modelos representativos, los cuales fueron desarrollados como modulos en forma independiente para integrarse al simulador.

  11. SF6 gas insulated power substations. Effects of fast transients (VFT) on the equipment and adjacent equipment of the Itaipu Binacional SF6 insulated power substations; Subestaciones aisladas a gas SF6. Efectos de los transitorios rapidos (VFT's) sobre equipos y equipos adyacentes de las SE's SF6 de Itaipu Binacional

    Energy Technology Data Exchange (ETDEWEB)

    Santacruz Martinez, Miguel [Usina Hidroelectrica de Itaipu, Assuncao (Paraguay)]. E-mail: santcruz@itaipu.gov.py

    2001-07-01

    With the operation starting of the S F6 gas substations in high voltage systems occurs a new form of overvoltage presently known as Very Fast Transients. This paper aims the phenomenon characterization, defining the origins and the behaviour of the electric systems, and briefly presents the damages caused by the phenomenon on the equipment and adjacent equipment of S F6 gas insulated substations of the Itaipu Binacional, mainly on the power transformers and oil/S F6 isolators of the step-up transformers. These equipment was modified or are been modified as a consequence of the this overvoltage effects.

  12. Lightning rod ionizing natural ionca - Ionic electrode active trimetallictriac of grounding - Definitive and total solution against 'blackouts' and electrical faults generated by atmospheric charges (lightning)

    Energy Technology Data Exchange (ETDEWEB)

    Cabareda, Luis

    2010-09-15

    The Natural Ionizing System of Electrical Protection conformed by: Lightning Rod Ionizing Natural Ionca and Ionic Electrode Active Trimetallic Triac of Grounding offers Total Protection, Maximum Security and Zero Risk to Clinics, Hospitals, Integral Diagnostic Center, avoiding ''the burning'' of Electronics Cards; Refineries, Tanks and Stations of Fuel Provision; Electrical Substations, Towers and Transmission Lines with transformer protection, motors, elevators, A/C, mechanicals stairs, portable and cooling equipment, electrical plants, others. This New High Technology is the solution to the paradigm of Benjamin Franklin and it's the mechanism to end the 'Blackouts' that produces so many damages and losses throughout the world.

  13. Decentralized substations for low-temperature district heating with no Legionella risk, and low return temperatures

    DEFF Research Database (Denmark)

    Yang, Xiaochen; Li, Hongwei; Svendsen, Svend

    2016-01-01

    . From the results, realizing LTDH by the decentralized substation unit, 30% of the annual distribution heat loss inside the building can be saved compared to a conventional system with medium-temperature district heating. Replacing the bypass pipe with an in-line supply pipe and a heat pump...... with domestic hot water (DHW) circulation. In this study, a system with decentralized substations was analysed as a solution to this problem. Furthermore, a modification for the decentralized substation system were proposed in order to reduce the average return temperature. Models of conventional system...... with medium-temperature district heating, decentralized substation system with LTDH, and innovative decentralized substation system with LTDH were built based on the information of a case building. The annual distribution heat loss and the operating costs of the three scenarios were calculated and compared...

  14. Impact of Electric Vehicle Charging Station Load on Distribution Network

    Directory of Open Access Journals (Sweden)

    Sanchari Deb

    2018-01-01

    Full Text Available Recent concerns about environmental pollution and escalating energy consumption accompanied by the advancements in battery technology have initiated the electrification of the transportation sector. With the universal resurgence of Electric Vehicles (EVs the adverse impact of the EV charging loads on the operating parameters of the power system has been noticed. The detrimental impact of EV charging station loads on the electricity distribution network cannot be neglected. The high charging loads of the fast charging stations results in increased peak load demand, reduced reserve margins, voltage instability, and reliability problems. Further, the penalty paid by the utility for the degrading performance of the power system cannot be neglected. This work aims to investigate the impact of the EV charging station loads on the voltage stability, power losses, reliability indices, as well as economic losses of the distribution network. The entire analysis is performed on the IEEE 33 bus test system representing a standard radial distribution network for six different cases of EV charging station placement. It is observed that the system can withstand placement of fast charging stations at the strong buses up to a certain level, but the placement of fast charging stations at the weak buses of the system hampers the smooth operation of the power system. Further, a strategy for the placement of the EV charging stations on the distribution network is proposed based on a novel Voltage stability, Reliability, and Power loss (VRP index. The results obtained indicate the efficacy of the VRP index.

  15. Electricity Generation Through the Koeberg Nuclear Power Station of Eskom in South Africa

    International Nuclear Information System (INIS)

    Dladla, G.; Joubert, J.

    2015-01-01

    The poster provides information on the process of nuclear energy generation in a nuclear power plant in order to produce electricity. Nuclear energy currently provides approximately 11% of the world’s electricity needs, with Koeberg Nuclear Power Station situated in the Western Cape providing 4.4% of South Africa’s electricity needs. As Africa’s first nuclear power station, Koeberg has an installed capacity of 1910 MW of power. Koeberg’ s total net output is 1860 MW. While there are significant differences, there are many similarities between nuclear power plants and other electrical generating facilities. Uranium is used for fuel in nuclear power plants to make electricity. With the exception of solar, wind, and hydroelectric plants, all others including nuclear plants convert water to steam that spins the propeller-like blades of a turbine that spins the shaft of a generator. Inside the generator coils of wire and magnetic fields interact to create electricity. The energy needed to boil water into steam is produced in one of two ways: by burning coal, oil, or gas (fossil fuels) in a furnace or by splitting certain atoms of uranium in a nuclear energy plant. The uranium fuel generates heat through a controlled fission process fission, which is described in this poster presentation. The Koeberg Nuclear Power Station is a Pressurised water reactor (PWR). The operating method and the components of the Koeberg Power Station are also described. The nuclear waste generated at a nuclear power station is described under three headings— low-level waste, intermediate-level waste and used or spent fuel, which can be solid, liquid or gaseous. (author)

  16. Novel wind powered electric vehicle charging station with vehicle-to-grid (V2G) connection capability

    International Nuclear Information System (INIS)

    Fathabadi, Hassan

    2017-01-01

    Highlights: • The only wind powered EV charging station reported in the literature. • The charging station maximally converts wind energy into electric energy. • Novel fast and highly accurate MPPT technique implemented in the EV charging station. • The charging station is grid-connected type with vehicle-to-grid (V2G) technology. • The charging station balances load demand in the grid connected to it. - Abstract: In this study, a novel grid-connected wind powered electric vehicle (EV) charging station with vehicle-to-grid (V2G) technology is designed and constructed. The wind powered EV charging station consists of a wind energy conversion system (WECS), a unidirectional DC/DC converter connected to the WECS, a maximum power point tracking (MPPT) controller, 15 bidirectional DC/DC converters dedicated to 15 charging stations provided for charging EVs, and a three-phase bidirectional DC/AC inverter connected to the grid. The contribution of this work is that the grid-connected wind powered EV charging station presented in this work is the only constructed EV charging station reported in the literature that uses wind energy as a renewable resource to produce electric energy for charging EVs, and moreover, it maximally converts wind energy into electric energy because it uses a novel fast and highly accurate MPPT technique proposed in this study. Other works are only simulated models without any new MPPT consideration. It is demonstrated that the constructed wind powered EV charging station is a perfect charging station that not only produces electric energy to charge EVs but also balances load demand in the grid connected to it.

  17. Design requirements document for the phase 1 privatization electrical power system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  18. Design requirements document for the phase 1 privatization electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract

  19. Simulation study on the lightning overvoltage invasion control transformer intelligent substation

    Science.gov (United States)

    Xi, Chuyan; Hao, Jie; Zhang, Ying

    2018-04-01

    By simulating lightning on substation line of one intelligent substation, research the influence of different lightning points on lightning invasion wave overvoltage, and the necessity of arrester for the main transformer. The results show, in a certain lightning protection measures, the installation of arrester nearby the main transformer can effectively reduce the overvoltage value of bus and the main transformer [1].

  20. Modeling reliability of power systems substations by using stochastic automata networks

    International Nuclear Information System (INIS)

    Šnipas, Mindaugas; Radziukynas, Virginijus; Valakevičius, Eimutis

    2017-01-01

    In this paper, stochastic automata networks (SANs) formalism to model reliability of power systems substations is applied. The proposed strategy allows reducing the size of state space of Markov chain model and simplifying system specification. Two case studies of standard configurations of substations are considered in detail. SAN models with different assumptions were created. SAN approach is compared with exact reliability calculation by using a minimal path set method. Modeling results showed that total independence of automata can be assumed for relatively small power systems substations with reliable equipment. In this case, the implementation of Markov chain model by a using SAN method is a relatively easy task. - Highlights: • We present the methodology to apply stochastic automata network formalism to create Markov chain models of power systems. • The stochastic automata network approach is combined with minimal path sets and structural functions. • Two models of substation configurations with different model assumptions are presented to illustrate the proposed methodology. • Modeling results of system with independent automata and functional transition rates are similar. • The conditions when total independence of automata can be assumed are addressed.

  1. 78 FR 50026 - Basin Electric Power Cooperative, Inc.: Notice of Intent To Prepare a Supplemental Draft...

    Science.gov (United States)

    2013-08-16

    ... transmission lines, 5 new substations, modifications to 4 existing substations, maintenance access roads... address the construction, operation, and maintenance of Basin Electric's proposed Project. The Project includes construction, operation and maintenance of approximately 275 [[Page 50027

  2. Advantages of horizontal and vertical integration in process- and switch gear control; Vorteile einer horizontalen und vertikalen Integration in Prozess- und Schaltanlagenautomatisierung

    Energy Technology Data Exchange (ETDEWEB)

    Erning, Peter; Langlotz, Kati [ABB AG, Mannheim (Germany). Div. Energietechnik

    2010-07-01

    Higher operating efficiency in power generation is more and more in the focus. Traditional control systems are frequently confined to the vertical integration of process control. It is quite common to use separate SCADA systems for controlling electrical auxiliary systems. However, there exists an overlap between these domains: major loads though belonging to the process are operated by medium-voltage switch gear. Until now the necessary control interconnections required the installation of costly and inflexible marshalling racks. Integrated operation and diagnostics was difficult to implement. These disadvantages apply accordingly in case of implementation of the entire sub-station via direct wiring. State-of-the-art control systems connect these two worlds in one system by integration of sub-station automation using the open standard IEC 61850 which allows freedom of choice in equipment and full access to all sub-station data. (orig.)

  3. EMC considerations for protection of cables against switching effects at secondary side of substations

    Energy Technology Data Exchange (ETDEWEB)

    Heydari, H.; Faghihi, F.; Abbasi, V. [Iran Univ. of Science and Technology, Narmak, Tehran (Iran, Islamic Republic of). Center of Excellence for Power System Automation and Operation

    2007-07-01

    High performance and correct functionality of equipment that operate in high voltage substations during transient states need careful engineering design. To achieve electromagnetic compatibility (EMC) in a system, it is necessary to correct design problems and to use special methods like shielding, grounding and filtering which cause an increase in overall cost. This paper discussed a study of a medium voltage substation whose switching process caused electromagnetic interference to low voltage cables. Three methods of decreasing overvoltage and overcurrent were discussed and compared. Recognition of magnetic fields was accomplished by ANSYS (base on finite element method). In addition, overvoltages during the switching process were calculated by common mode and differential mode equivalent circuit. The purpose of the study was to assist designers and engineers in selecting a suitable method to achieve electromagnetic compatibility in a substation. The paper discussed the amplitude of switching currents; common mode current; and methods of reducing overvoltages and overcurrents. These methods included differential mode current and shielding. It was concluded that several methods exist to protect a substations against electromagnetic interference effects. An important problem is the structure of switching in a substation that determines the strength of electromagnetic interference. A substation designer can chose the best way to achieve EMC by considering a switching structure that depends on system topology and cost function of the selected method. 7 refs., 17 figs.

  4. Evaluation of Waterford Steam Electric Station Unit 3 technical specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-09-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Waterford Steam Electric Station Unit 3 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the requirements of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Waterford T/S. Several discrepancies were identified and subsequently resolved by the cognizant NRC reviewer. Pending completion of the resolutions noted in Part 3 of this report, the Waterford Steam Electric Station Unit 3 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  5. Electric machinery and drives in thermal power stations. Elektrische Maschinen und Antriebe in thermischen Kraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    1974-01-01

    The following subjects were dealt with during the VDE meeting: 1) Requirements made by the electric network on the generators and their excitation equipment, and the influence thereof on their design; 2) requirements made by the power station process on the electric drives and the influence thereof on type and design; 3) requirements made on protective measures from the point of the electric power station machinery.

  6. Meeting the challenges of managing substation equipment assets

    Energy Technology Data Exchange (ETDEWEB)

    Shaver, J. [CEA Technologies (Canada)

    2005-06-01

    Best practices for monitoring and assessing substation equipment are discussed. Scheduled time-based maintenance is the most common, but recent evidence indicates that despite it being the most expensive, it may not always identify potential failures. The author recommends developing decision-making tools that take into account obsolescence, reliability, safety and environmental issues, as well as operating, repair and carrying costs, as absolutely necessary for consistent and intelligent decision-making. Given the high cost of research, the author recommends developing such tools through pooling of skills and collaboration with other utilities, as the preferred way to develop best practices. The Life Cycle Management of Substation Equipment and Apparatus Interest Group of CEA Technologies Inc is one such group that was formed to help utilities facilitate their research and technology development endeavours. The group's current focus is on developing equipment diagnostics and life optimization through the development of validation tools for predicting remaining life and/or extending life. Brief descriptions of these, and other completed project are given. Completed projects described include developing tools for predicting remaining life of transformers, power connectors and disconnect switches, safety protocol for restoration of substations involved with fires/explosions, and compiling a critical review of diagnostic instruments designed to assess transformer conditions.

  7. An Analytical Planning Model to Estimate the Optimal Density of Charging Stations for Electric Vehicles.

    Directory of Open Access Journals (Sweden)

    Yongjun Ahn

    Full Text Available The charging infrastructure location problem is becoming more significant due to the extensive adoption of electric vehicles. Efficient charging station planning can solve deeply rooted problems, such as driving-range anxiety and the stagnation of new electric vehicle consumers. In the initial stage of introducing electric vehicles, the allocation of charging stations is difficult to determine due to the uncertainty of candidate sites and unidentified charging demands, which are determined by diverse variables. This paper introduces the Estimating the Required Density of EV Charging (ERDEC stations model, which is an analytical approach to estimating the optimal density of charging stations for certain urban areas, which are subsequently aggregated to city level planning. The optimal charging station's density is derived to minimize the total cost. A numerical study is conducted to obtain the correlations among the various parameters in the proposed model, such as regional parameters, technological parameters and coefficient factors. To investigate the effect of technological advances, the corresponding changes in the optimal density and total cost are also examined by various combinations of technological parameters. Daejeon city in South Korea is selected for the case study to examine the applicability of the model to real-world problems. With real taxi trajectory data, the optimal density map of charging stations is generated. These results can provide the optimal number of chargers for driving without driving-range anxiety. In the initial planning phase of installing charging infrastructure, the proposed model can be applied to a relatively extensive area to encourage the usage of electric vehicles, especially areas that lack information, such as exact candidate sites for charging stations and other data related with electric vehicles. The methods and results of this paper can serve as a planning guideline to facilitate the extensive

  8. An Analytical Planning Model to Estimate the Optimal Density of Charging Stations for Electric Vehicles.

    Science.gov (United States)

    Ahn, Yongjun; Yeo, Hwasoo

    2015-01-01

    The charging infrastructure location problem is becoming more significant due to the extensive adoption of electric vehicles. Efficient charging station planning can solve deeply rooted problems, such as driving-range anxiety and the stagnation of new electric vehicle consumers. In the initial stage of introducing electric vehicles, the allocation of charging stations is difficult to determine due to the uncertainty of candidate sites and unidentified charging demands, which are determined by diverse variables. This paper introduces the Estimating the Required Density of EV Charging (ERDEC) stations model, which is an analytical approach to estimating the optimal density of charging stations for certain urban areas, which are subsequently aggregated to city level planning. The optimal charging station's density is derived to minimize the total cost. A numerical study is conducted to obtain the correlations among the various parameters in the proposed model, such as regional parameters, technological parameters and coefficient factors. To investigate the effect of technological advances, the corresponding changes in the optimal density and total cost are also examined by various combinations of technological parameters. Daejeon city in South Korea is selected for the case study to examine the applicability of the model to real-world problems. With real taxi trajectory data, the optimal density map of charging stations is generated. These results can provide the optimal number of chargers for driving without driving-range anxiety. In the initial planning phase of installing charging infrastructure, the proposed model can be applied to a relatively extensive area to encourage the usage of electric vehicles, especially areas that lack information, such as exact candidate sites for charging stations and other data related with electric vehicles. The methods and results of this paper can serve as a planning guideline to facilitate the extensive adoption of electric

  9. Analysis and quality of service evaluation of a fast charging station for electric vehicles

    International Nuclear Information System (INIS)

    Zenginis, Ioannis; Vardakas, John S.; Zorba, Nizar; Verikoukis, Christos V.

    2016-01-01

    Electrification of transportation is considered as one of the most promising ways to mitigate climate change and reduce national security risks from oil and gasoline imports. Fast charging stations that provide high quality of service will facilitate the wide market penetration of electric vehicles. In this paper, the operation of a fast charging station is analyzed by employing a novel queuing model. The proposed analysis considers that the various electric vehicle models are classified by their battery size, and computes the customers' mean waiting time in the queue by taking into account the available charging spots, as well as the stochastic arrival process and the stochastic recharging needs of the various electric vehicle classes. Furthermore, a charging strategy is proposed according to which the drivers are motivated to limit their energy demands. The implementation of the proposed strategy allows the charging station to serve more customers without any increase in the queue waiting time. The high precision of the present analytical model is confirmed through simulations. Therefore, it may be utilized by existing fast charging station operators that need to provide high quality of service, or by future investors that need to design an efficient installation. - Highlights: • A fast charging station for multiple classes of electric vehicles is presented and analyzed. • A novel multiclass queuing model is presented for the mean queue waiting time derivation. • The system's arrival rate capacity is derived given a maximum tolerable waiting time limit. • A charging strategy is proposed aiming at increasing the system's arrival rate capacity. • The charging station operator's revenue is calculated based on the energy drawn by the electric vehicles.

  10. Resilient design of recharging station networks for electric transportation vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Kris Villez; Akshya Gupta; Venkat Venkatasubramanian

    2011-08-01

    As societies shift to 'greener' means of transportation using electricity-driven vehicles one critical challenge we face is the creation of a robust and resilient infrastructure of recharging stations. A particular issue here is the optimal location of service stations. In this work, we consider the placement of battery replacing service station in a city network for which the normal traffic flow is known. For such known traffic flow, the service stations are placed such that the expected performance is maximized without changing the traffic flow. This is done for different scenarios in which roads, road junctions and service stations can fail with a given probability. To account for such failure probabilities, the previously developed facility interception model is extended. Results show that service station failures have a minimal impact on the performance following robust placement while road and road junction failures have larger impacts which are not mitigated easily by robust placement.

  11. Energy and exergy analysis of electricity generation from natural gas pressure reducing stations

    International Nuclear Information System (INIS)

    Neseli, Mehmet Alparslan; Ozgener, Onder; Ozgener, Leyla

    2015-01-01

    Highlights: • Forecasting the recoverable energy from natural gas pressure reduction stations. • Electricity generation through pressure reduction stations via turboexpanders. • A thermodynamics analysis of PRS. - Abstract: Electricity generation or power recovery through pressure reduction stations (PRS) for general use has not been realized in Izmir. The main objective of the present study was to do a case study for calculating electricity to be recovered in one natural gas pressure reduction stations in Izmir. It is the first forecasting study to obtain energy from natural gas pressure-reducing stations in Izmir. Energy can be obtained from natural gas PRS with turbo-expanders instead of using throttle valves or regulators from the PRS. The exergy performance of PRS with TE is evaluated in this study. Exergetic efficiencies of the system and components are determined to assess their individual performances. Based upon pressure change and volumetric flow rate, it can be obtained by recovering average estimated installed capacity and annual energy 494.24 kW, 4113.03 MW h, respectively. In terms of estimated installed capacity power and annual energy, the highest level is 764.88 kW, approximately 6365.34 MW h, in Aliaga PRS. Also it can be seen that CO 2 emission factor average value is 295.45 kg/MW h

  12. Space station electrical power distribution analysis using a load flow approach

    Science.gov (United States)

    Emanuel, Ervin M.

    1987-01-01

    The space station's electrical power system will evolve and grow in a manner much similar to the present terrestrial electrical power system utilities. The initial baseline reference configuration will contain more than 50 nodes or busses, inverters, transformers, overcurrent protection devices, distribution lines, solar arrays, and/or solar dynamic power generating sources. The system is designed to manage and distribute 75 KW of power single phase or three phase at 20 KHz, and grow to a level of 300 KW steady state, and must be capable of operating at a peak of 450 KW for 5 to 10 min. In order to plan far into the future and keep pace with load growth, a load flow power system analysis approach must be developed and utilized. This method is a well known energy assessment and management tool that is widely used throughout the Electrical Power Utility Industry. The results of a comprehensive evaluation and assessment of an Electrical Distribution System Analysis Program (EDSA) is discussed. Its potential use as an analysis and design tool for the 20 KHz space station electrical power system is addressed.

  13. Electric engineering summary

    International Nuclear Information System (INIS)

    Kang, Sing Eun; Park, Seong Taek; Lim, Yong Un

    1975-03-01

    This book is made up six parts, which deals with circuit theory about sinusoidal alternating current, basic current circuit, wave power, distorted wave, two terminal network, distributed circuit, laplace transformation and transfer function, power engineering on line, failure analysis transmission of line, substation and protection device and hydroelectric power plant, electricity machine like DC machine, electric transformer, induction machine and rectifier, electromagnetic on dielectric substance current, electromagnetic, electricity application like lighting engineering, heat transfer and electricity chemistry, industry, industry math with integer, rational number, factorization, matrix and differential.

  14. Casebook on electric safety accidents

    International Nuclear Information System (INIS)

    1987-09-01

    This book gives concentration on electric safety accidents in domestic and abroad, which introduces general electrical safety with property of electricity, safe equipment and maintenance and protection of electric shock. It lists the cases of accident caused of electricity in domestic like accident in power substation, utilization equipment, load system and another accident by electricity like death in electric shock another by electricity like death in electric shock in new building construction, the cases caused of electricity in abroad like damage in electric shock by high voltage electric transformer, electric shock in summer and earth fault accident by fault cooling tower.

  15. Mitigation of Transient Overvoltages Generated Due to Switching Operations and Lightning in Gas-insulated Substation (GIS Without Extra Limiter

    Directory of Open Access Journals (Sweden)

    A. Tavakoli

    2011-09-01

    Full Text Available Gas-insulated substations (GIS have different specifications in proportion to air-insulated substations. Transformer failures related to lightning and switching are often reported in the gas insulated substation (GIS. This problem is the voltage magnifications due to reflections of switching and lightning surges at various junctions within the GIS. thereby overvoltages in GIS are more important than air-insulated substation. There are methods to suppress the stresses created by lightning and switching. However, these methods are suitable before installing the substation and during the substation design period. This paper presents feasible methods for mitigation of the overvoltage magnitude. The advantages of the proposed methods are their simplicity and low cost for implantation along with producing minimal changes in the installed GIS.

  16. Implementation of superconducting fault current limiter for flexible operation in the power substation

    Energy Technology Data Exchange (ETDEWEB)

    Song, Chong Suk, E-mail: chong_suk@korea.ac.kr [School of Electrical Engineering, Korea University, Anam dong, Seonbukgu, Seoul 136-713 (Korea, Republic of); Lee, Hansang [School of Railway and Electrical Engineering, Kyungil University, Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do 712-701 (Korea, Republic of); Cho, Yoon-sung [Department of Electric and Energy Engineering, Catholic University of Daegu, Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do 712-702 (Korea, Republic of); Suh, Jaewan [School of Electrical Engineering, Korea University, Anam dong, Seonbukgu, Seoul 136-713 (Korea, Republic of); Jang, Gilsoo, E-mail: gjang@korea.ac.kr [School of Electrical Engineering, Korea University, Anam dong, Seonbukgu, Seoul 136-713 (Korea, Republic of)

    2014-09-15

    Highlights: • The power load concentrated in load centers results in high levels of fault current. • This paper introduces a fault current reduction scheme using SFCLs in substations. • The SFCL is connected in parallel to the bus tie between the two busbars. • The fault current mitigation using SFCLs is verified through PSS/e simulations. - Abstract: The concentration of large-scale power loads located in the metropolitan areas have resulted in high fault current levels during a fault thereby requiring the substation to operate in the double busbar configuration mode. However, the double busbar configuration mode results in deterioration of power system reliability and unbalanced power flow in the adjacent transmission lines which may result in issues such as overloading of lines. This paper proposes the implementation of the superconducting fault current limiter (SFCL) to be installed between the two substation busbars for a more efficient and flexible operation of the substation enabling both single and double busbar configurations depending on the system conditions for guaranteeing power system reliability as well as fault current limitations. Case studies are being performed for the effectiveness of the SFCL installation and results are compared for the cases where the substation is operating in single and double busbar mode and with and without the installation of the SFCL for fault current mitigation.

  17. Unidirectional Magneto-Electric Dipole Antenna for Base Station: A Review

    Science.gov (United States)

    Idayachandran, Govindanarayanan; Nakkeeran, Rangaswamy

    2018-04-01

    Unidirectional base station antenna design using Magneto-Electric Dipole (MED) has created enormous interest among the researchers due to its excellent radiation characteristics like low back radiation, symmetrical radiation at E-plane and H-plane compared to conventional patch antenna. Generally, dual polarized antennas are used to increase channel capacity and reliability of the communication systems. In order to serve the evolving mobile communication standards like long term evolution LTE and beyond, unidirectional dual polarized MED antenna are required to have broad impedance bandwidth, broad half power beamwidth, high port isolation, low cross polarization level, high front to back ratio and high gain. In this paper, the critical electrical requirements of the base station antenna and frequently used frequency bands for modern mobile communication have been presented. It is followed by brief review on broadband patch antenna and discussion on complementary antenna concepts. Finally, the performance of linearly polarized and dual polarized magneto-electric dipole antennas along with their feeding techniques are discussed and summarized. Also, design and modeling of developed MED antenna is presented.

  18. Accurately Localize and Recognize Instruments with Substation Inspection Robot in Complex Environments

    Directory of Open Access Journals (Sweden)

    Hui Song

    2014-07-01

    Full Text Available This paper designs and develops an automatic detection system in the substation environment where complex and multi-inspecting objects exist. The inspection robot is able to fix and identify the objects quickly using a visual servo control system. This paper focuses on the analysis of fast lockup and recognition method of the substation instruments based on an improved Adaboost algorithm. The robot adjusts its position to the best view point and best resolution for the instrument in real-time. The dial and pointer of the instruments are detected with an improved Hough algorithm, and the angle of the pointer is converted to the corresponding readings. The experimental results indicate that the inspection robot can fix and identify the substation instruments quickly, and has a wide range of practical applications.

  19. Supervisory control system based on PC applied to substations automatization of and to regional operation centers of distribution networks; Sistema de control supervisorio basado en PC aplicado en automatizacion de subestaciones y centros de operacion regional de redes de distribucion

    Energy Technology Data Exchange (ETDEWEB)

    Picasso B, Cuitlahuac [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Astorga Q, Clemente [Luz y Fuerza del Centro (Mexico)

    2003-07-01

    In order to increase the services quality in the electrical energy, to improve the process of identification of energy losses, to increase the equipment efficiency, to count on more complete statistics of profiles of load consumptions, among other applications, the Compania de Luz y Fuerza del Centro (LyFC) carries out the modernization in automatization of substations and regional operation centers of distribution networks. The technological base to make these programs requires automating the operative schemes of the substation and distribution centers that supervise the events of the electrical process. In this article the main results of the development and integration of master stations based on PC, that were made in the Instituto de Investigaciones Electricas (IIE) and that have been integrated in the electrical company LyFC are presented. [Spanish] Con el proposito de incrementar la calidad de los servicios en la energia electrica, mejorar el proceso de identificacion de perdidas de energia, aumentar la eficiencia de los equipos, contar con estadisticas mas completas de perfiles de consumos de carga, entre otras aplicaciones, la Compania de Luz y Fuerza del Centro (LyFC) lleva a cabo la modernizacion en automatizacion de subestaciones y centros de operacion regional de redes electricas de distribucion. La base tecnologica para realizar estos programas, requiere de automatizar los esquemas operativos de la subestacion y centros de distribucion que supervisan los eventos del proceso electrico. En este articulo se presentan los principales resultados del desarrollo e integracion de estaciones maestras basadas en PC, que se realizaron en el Instituto de Investigaciones Electricas (IIE) y que se han integrado en la compania electrica LyFC.

  20. Discovery Mondays - The particle physicist's best friend: electricity

    CERN Document Server

    2005-01-01

    One of CERN's electrical substations, at Prévessin. Electricity is one of CERN's closest allies. Without it, none of the physicists' extraordinary instruments would work. It is electricity that will guide and accelerate particles around the 27-km ring of the world's most powerful accelerator, the LHC. In the giant magnets inside the experiments electricity is also used to produce a magnetic field 200,000 times greater than the Earth's own magnetic field. Inside the detectors, the resulting magnetic force is used to bend the trajectories of the particles, allowing them to be identified and helping us gain a better understanding of what has happened at the heart of the collisions. Understanding how magnetic fields are produced inside the ATLAS experiment is one of several themes on the programme of the next Discovery Monday. And for a close-up view of operations, we'll also be taking you on a visit to the electricity substation at Meyrin. Come and meet CERN's best friend - electricity. Join us at the Micro...

  1. VT Electric Transmission Line Corridors - substation points

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  2. Implementation of computational model for the evaluation of electromagnetic susceptibility of the cables for communication and control of high voltage substations; Implementacao de modelo computacional para a avaliacao da suscetibilidade eletromagnetica dos cabos de comunicacao e controle de subestacoes de alta tensao

    Energy Technology Data Exchange (ETDEWEB)

    Sartin, Antonio C.P. [Companhia de Transmissao de Energia Eletrica Paulista (CTEEP), Bauru, SP (Brazil); Dotto, Fabio R.L.; Sant' Anna, Cezar J.; Thomazella, Rogerio [Fundacao para o Desenvolvimento de Bauru, SP (Brazil); Ulson, Jose A.C.; Aguiar, Paulo R. de [Universidade Estadual Paulista Julio de Mesquita Filho (UNESP), Bauru, SP (Brazil)

    2009-07-01

    This work show the implementation of a electromagnetic model for supervision cable, protection, communication and high voltage substations control that was investigated in literature and adapted. The model was implemented by using a computational tool in order to obtain the electromagnetic behavior of various cables used in CTEEP substation, subject to several sources of electromagnetic interference in this inhospitable environment, such as lightning strikes, outbreaks of maneuvers switching and the corona effect. The results obtained in computer simulations were compared with results of laboratory tests carried out on a lot of cables that represent those systems that are present in substations 440 kV. This study characterized the electromagnetic interference, ranked them, identified possible susceptible points in the substation, which contributed to the development of a technical procedure that minimizes unwanted effects caused in communication systems and substation control. This developed procedure also assured the maximum reliability and availability in the operation of the electrical power system to the company.

  3. Digest of current research in the electric-utility industry. Volume 1. Categories 1-5

    International Nuclear Information System (INIS)

    Andrews, K.; Bates, P.; Berkey, R.; Gray, K.; Kindt, C.; O'Gara, M.; Pakulski, R.

    1980-01-01

    The major objective of the Electric Power Research Institute (EPRI) is to be a prime source of information of R and D activities in the field of electric energy. Therefore, EPRI developed the Research and Development Information System (RDIS) which is a computerized data base of research projects sponsored by EPRI and by individual electric utilities throughout the US. The heart of RDIS is a computerized on-line data base containing approximately 7200 records of R and D projects. The data base is organized into 13 major categories: General R and D support, hydroelectric power, nuclear power, fossil fuels, advanced power systems, transmission, distribution, stations and substations, consumer utilization, economics, personnel, area development, and environmental assessment. This issue of the Digest of Current Research, issued annually and published in two volumes, represents the data base as of August 1980. This volume covers categories 1 through 5. Subject and corporate indexes are included

  4. Digest of current research in the electric-utility industry. Volume 2. Categories 6-13

    International Nuclear Information System (INIS)

    Andrews, K.; Bates, P.; Berkey, R.; Gray, K.; Kindt, C.; O'Gara, M.; Pakulski, R.

    1980-01-01

    The major objective of the Electric Power Research Institute (EPRI) is to be a prime source of information of R and D activities in the field of electric energy. Therefore, EPRI developed the Research and Development Information System (RDIS) which is a computerized data base of research projects sponsored by EPRI and by individual electric utilities throughout the US. The heart of RDIS is a computerized on-line data base containing approximately 7200 records of R and D projects. The data base is organized into 13 major categories: General R and D Support, hydroelectric power, nuclear power, fossil fuels, advanced power systems, transmission, distribution, stations and substations, consumer utilization, economics, personnel, area development, and environmental assessment. This issue of the Digest of Current Research, issued annually and published in two volumes represents the data base as of August 1980. This volume covers categories 6 through 13. Subject and corporate indexes are included

  5. Overview of electrical energy in November 2003

    International Nuclear Information System (INIS)

    2003-01-01

    The purpose of this document is to provide information concerning the operation of the French public transmission network and power system during the past month. The data published are interim figures dated 9 December 2003. National electrical consumption in France: national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses. Gross consumption for the month of November 2003 rose by 2.5% compared with November 2002, mainly due to increased use of heating, as the average monthly temperature fell by 0.5 deg. C compared with November 2002. Adjusted for climate contingencies, monthly consumption rose by 0.9% compared with November 2002. In cumulative figures over 12 months, the rate of growth in adjusted consumption fell by 0.2% since last month, and the rate of growth in gross national consumption rose by 0.6 points. The energy balance recorded by the transmission network (the balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network). Consumption and physical exchanges, noteworthy data (these values reflect all the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electricity market; the market players; contractual exchanges recorded by RTE (contracts for access to international connections, contractual exchanges by border (these exchanges include all transactions managed by RTE including historical contracts)). Transmission network development (the following facilities were commissioned on the RTE network in November): the 63 kV substation at Volvon, and the 63 kV Montrond-Volvon and Veauche-Volvon 2 lines, for strengthening 63 kV supply to the St Etienne region; the 63 k

  6. The environmental evaluation of substation based on the fuzzy analytic hierarchy process

    Science.gov (United States)

    Qian, Wenxiao; Zuo, Xiujiang; Chen, Yuandong; Ye, Ming; Fang, Zhankai; Yang, Fan

    2018-02-01

    This paper studies on the different influences on the environment of the substations and puts forward an index system of environmental protection through the fuzzy analytic hierarchy process. A comprehensive environmental evaluation on a substation is carried out through investigation and measurement of the current environmental factors, and the statistical data has validated the effectiveness and feasibility of this evaluation index system. The results indicate that the proposed model has high efficiency.

  7. Research on the Best Root Span of 500kV Substation Frame Based on Finite Element

    Science.gov (United States)

    Chen, Hao; Fang, Qing; Chen, Haoyuan

    2018-01-01

    A-shaped and steel tube structures have been widely applied when designing 500kV substation frame in China. While, compared with steel tube, angle steels have an advantage of easy-transporting, especially in oversea projects. However, researches on substation frame with angle steel were not enough. In order to find out the best root span of 500kV substation frame under similar engineering conditions, using the overseas project substation frame as an example, the substation frames with different root span have been detailed calculated, to find the best root span according to the cost of it. When the height of column is about 30m, the root suggestion value is 6.1m×3.1m. And then, the buckling analysis of the overall structure has been carried out by ANSYS, to find out that the weak part of the structure is in the middle of it. The structural adjustment is carried out for the weak part, including adjusting the web members and the chord members, to obtain a higher bearing capacity of the structure.

  8. Probabilistic Harmonic Calculation in Distribution Networks with Electric Vehicle Charging Stations

    Directory of Open Access Journals (Sweden)

    Jianxue Wang

    2014-01-01

    Full Text Available Integrating EV charging station into power grid will bring impacts on power system, among which the most significant one is the harmonic pollution on distribution networks. Due to the uncertainty of the EV charging process, the harmonic currents brought by EV charging stations have a random nature. This paper proposed a mathematical simulation method for studying the working status of charging stations, which considers influencing factors including random leaving factor, electricity price, and waiting time. Based on the proposed simulation method, the probability distribution of the harmonic currents of EV charging stations is obtained and used in the calculation of the probability harmonic power flow. Then the impacts of EVs and EV charging stations on distribution networks can be analyzed. In the case study, the proposed simulation and analysis method is implemented on the IEEE-34 distribution network. The influences of EV arrival rates, the penetration rate, and the accessing location of EV charging station are also investigated. Results show that this research has good potential in guiding the planning and construction of charging station.

  9. Toward a methodology for substate projections of registered nurse supply and demand in New York.

    Science.gov (United States)

    McGinnis, Sandra; Martiniano, Robert; Moore, Jean

    2010-01-01

    Even as concerns about nursing shortages continue nationwide and for individual states in the United States, there is little information on the impact of nursing shortages at substate levels, such as counties or groups of small counties. National and state level assessments can mask wide geographic variation in the distribution of registered nurses (RNs). The Center for Health Workforce Studies at the School of Public Health, University at Albany, developed a practical approach to projecting RN supply and demand at substate levels. The experimental model used in this research was adapted from a methodology utilized for the RN National Supply Model and National Demand Model developed by the Health Resources and Services Administration in the department of Health and Human Services to make RN supply and demand projections at the broader national and state levels. The Center's research highlighted the value of substate analyses in the identification of RN supply and demand gaps and found that supply and demand gaps vary greatly by region and within regions. This study also provided an in-depth understanding of the dynamics that drive substate labor markets for RNs as well as the need for substate analyses to help policymakers better allocate scarce resources to address nursing shortages.

  10. A method and device allowing a more rational exploitation of electrical power-stations

    International Nuclear Information System (INIS)

    Mascarello, Jean.

    1974-01-01

    Description is given of a device permitting a more rational exploitation of electrical power-stations characterized by the fact that, while electric power available during slack hours is used for pressurizing air (the thus pressurized air being stored in tanks), the electric power available during slack days is used for generating hydrogen from water, said hydrogen being stored in other tanks, combustion of the stored hydrogen by the stored air being used for generating electric power during electric power consumption peak-periods [fr

  11. Probabilistic modeling of nodal electric vehicle load due to fast charging stations

    DEFF Research Database (Denmark)

    Tang, Difei; Wang, Peng; Wu, Qiuwei

    2016-01-01

    In order to reduce greenhouse gas emission and fossil fuel dependence, Electric Vehicle (EV) has drawn increasing attention due to its zero emission and high efficiency. However, new problems such as range anxiety, long charging duration and high charging power may threaten the safe and efficient...... station into consideration. Fuzzy logic inference system is applied to simulate the charging decision of EV drivers at fast charging station. Due to increasing EV loads in power system, the potential traffic congestion in fast charging stations is modeled and evaluated by queuing theory with spatial...

  12. Electric power and the environment: An analysis of pollutant emissions at Argentine state-owned electric power stations

    Energy Technology Data Exchange (ETDEWEB)

    Carnevali, D; Suarez, C E [Instituto de Economia Energetica, San Carlos de Bariloche (Argentina)

    1991-08-01

    This paper describes the impact on particulate and 'greenhouse gases' emissions of substitution policies implemented by Argentine state-owned electric power stations. Those policies involve the substitution, on the one hand, of hydroelectric and nuclear energy for conventional thermal energy and, on the other hand, of natural gas for fuel oil, diesel oil and coal. As additional investments are required in conventional thermal power stations to prevent environmental pollution, the investment savings generated by substitution policies have been calculated. While the environmental impacts of hydroelectric, nuclear and natural gas facilities is locally significant and is experienced in geographical areas away from cities, there can be no doubt that the substitution policies implemented in the Argentine electricity sector have overall both ecological and economic benefits. (author). 1 ref., 8 figs, 2 tabs.

  13. Overview on the electric power in july 2003

    International Nuclear Information System (INIS)

    2003-01-01

    This document aims to give information on the exploitation of the transmission public network and the french electric power industry during july 2003: the internal electric power consumption in France (national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses) - national consumption in July 2003 has risen by 2.5% compared with July 2002. The July average temperature, which has been 2.3 deg. C higher in 2003 than in July 2002, has resulted in consumption linked to higher use of air-conditioning and agricultural sprinklers. Adjusted for climatic effects, monthly consumption has increased by 1.5% compared with July 2002. The consumption growth rate adjusted over 12 months has fallen by 0.2% since last month, whereas the national consumption growth rate over the last 12 months has fallen by 0.1%; the energy accounting from the transmission point of view (the balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network) - in July 2003, consumption has remained stable compared with July 2002, with increased deliveries to distribution networks (+0.7 TWh) compensating for the drop in deliveries to industrial consumers (-0.1 TWh) and exports (-0.5 TWh). Injections have risen slightly (+0.2 TWh) due to the combined effects of a substantial increase in thermal generation (+0.9 TWh) and imports (+0.1 TWh), which offset the considerable fall in hydro generation (-0.8 TWh); the consumption and the physical exchanges (these values reflect all of the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electric power market: the market players, contractual exchanges recorded by RTE contracts for

  14. Utilization of gamagraphy in shielded substation

    International Nuclear Information System (INIS)

    Franca, W.J.; Pereira, M.J.

    1987-01-01

    The radiographic inspection using gamma rays applied to the bars/ insulating cones conenctions in SF6 gas-insulated transmission lines to idetify the bars which its lenghts could cause a failure, without disassembling, is presented. Using gamma rays radiography it was possible to correct the lenght of the bars found out the permissible tolerances with substantial reduction of the servicing time and consequently increase of the substation reliability. (author) [pt

  15. Power substation location selection using fuzzy analytic hierarchy process and PROMETHEE: A case study from Bangladesh

    International Nuclear Information System (INIS)

    Kabir, Golam; Sumi, Razia Sultana

    2014-01-01

    Electromagnetic radiations emanating from the high voltage lines and substations pose serious adverse health consequences to living beings. As a result, selection of power substation location is an important strategic decision-making problem for both public and private sectors. In general, many conflicting factors affect the appropriate substation location selection problem which adheres to uncertain and imprecise data. In this paper, a simple, systematic and logical scientific approach is structured to evaluate power substation location through integrating Fuzzy Analytical Hierarchy Process (FAHP) with the Preference Ranking Organization Method for Enrichment Evaluations (PROMETHEE). The proposed integrated approach provides more realistic and reliable results, and facilitates the decision-maker to handle multiple contradictory decision perspectives through eliminating the limitations of FAHP and PROMETHEE methods. To accredit the proposed model, it is implemented in a power substation location selection problem in Bangladesh. - Highlights: • Integrate the strengths and eliminate the limitations of FAHP and PROMETHEE. • Consider social, technological, economic, environmental, and site characteristics criteria. • Determine the weights of criteria and sub-criteria using FAHP. • Present both PROMETHEE I and PROMETHEE II ranking. • Enable graphical representation of the alternatives and criteria by GAIA plane

  16. The effects of solar-geomagnetically induced currents on electrical systems in nuclear power stations

    International Nuclear Information System (INIS)

    Subudhi, M.; Carroll, D.P.; Kasturi, S.

    1994-01-01

    This report presents the results of a study to evaluate the potential effects of geomagnetically induced currents (GICs) caused by the solar disturbances on the in-plant electrical distribution system and equipment in nuclear power stations. The plant-specific electrical distribution system for a typical nuclear plant is modeled using the ElectroMagnetic Transient Program (EMTP). The computer model simulates online equipment and loads from the station transformer in the switchyard of the power station to the safety-buses at 120 volts to which all electronic devices are connected for plant monitoring. The analytical model of the plant's electrical distribution system is studied to identify the transient effects caused by the half-cycle saturation of the station transformers due to GIC. This study provides results of the voltage harmonics levels that have been noted at various electrical buses inside the plant. The emergency circuits appear to be more susceptible to high harmonics due to the normally light load conditions. In addition to steady-state analysis, this model was further analyzed simulating various plant transient conditions (e.g., loss of load or large motor start-up) occurring during GIC events. Detail models of the plant's protective relaying system employed in bus transfer application were included in this model to study the effects of the harmonic distortion of the voltage input. Potential harmonic effects on the uniterruptable power system (UPS) are qualitatively discussed as well

  17. Evaluation of the Optimal Connection of Power Transformers in the Substations of a Hospital

    Directory of Open Access Journals (Sweden)

    Carlos Javier Renedo

    2018-02-01

    Full Text Available Transformers are installed in power distribution systems to perform changes in supply voltage. Large consumers often have several transformers installed in parallel to ensure continuity of supply in the event of failure. These machines can achieve very high efficiency, but their efficiency is not constant since it depends on the power demanded at each time. Therefore, the level of efficiency that correspond to the operation of a specific transformer depends on two factors: machine technical characteristics and electrical load. In this work, the authors have proposed a methodology which shows the optimal number of transformers to be connected at each period in the substations of a large Spanish hospital, in order to achieve the maximum seasonal efficiency of these machines. The results of the energy saving are determined with respect to the current situation, in which all the transformers are permanently connected. On the other hand, the European Union has established a new regulation that sets the minimum energy efficiency requirements for new power transformers. This efficiency improvement is proposed to be applied gradually in two stages, a first limit came into force in 2015, while a more restrictive approach will appear in the year 2021. This work has also studied the potential energy savings that would occur when the substations of the hospital have more efficient transformers complying with the new European Regulation 548/2014.

  18. Electric power industry in China

    Energy Technology Data Exchange (ETDEWEB)

    Zisheng Jiang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents the status of the electric power in China, highlighting the following aspects: recent achievement, electricity increased sharing in the total energy consumption, technical economic indexes, nuclear power, renewable energy sources, rural electrification, transmission and power network, transmission lines and substations, present status and development trends for power network, regulation of power system dispatching, power system communication. The document also presents the future developing plan, approaching the outlook and strategy, development targets of the electric power industry and the administrative system reforming of the electric power industry.

  19. Assessment of Extremely Low Frequency (ELF Electric and Magnetic Fields in Hamedan High Electrical Power Stations and their Effects on Workers

    Directory of Open Access Journals (Sweden)

    Farshid Ghorbani Shahna

    2011-09-01

    Full Text Available Introduction: Public and occupational exposure to extremely low frequency (ELF electric and magnetic fields induced by electrical equipment is a significant issue in the environment and at the workplace due to their potential health effects on public health. The purpose of this study was assessment of the electric and magnetic fields intensities and determination of mental and psychological effects of occupational exposure in the high voltage electric power stations in the city of Hamadan, Iran. Material and Methods: The intensities of the magnetic and electric fields were measured at eight high voltage electric power stations at three different intervals of sources using an HI-3604 instrument. A two-part questionnaire was used to assess mental and psychological effects of the exposure to these fields. Two groups of control and case workers including 30 samples were selected to determine the exposure effects. Results: The results of field measurements showed the highest average electric field intensity was related to the CVT unit with 3110 V/m at a 2 m distance from the source and the lowest average was related to the control room with 1.35 V/m next to the source. Also, the highest and lowest magnetic field intensities were close to the transformator 2 and the battery room (50.42 and 1.31 mG, respectively. Discussion and Conclusion: The intensities of electric and magnetic fields in the selected stations are lower than the ACGIH and ICNIRP standard levels for occupational exposures. The results obtained indicate that the distribution of these fields was nonlinear around the sources and the effects observed on exposed workers were non-thermal.

  20. Electrical system design and reliability at Ontario Hydro nuclear generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Royce, C. J. [Ontario Hydro, 700 University Avenue, Toronto, Ontario M5G 1X6 (Canada)

    1986-02-15

    This paper provides an overview of design practice and the predicted and actual reliability of electrical station service Systems at Ontario Nuclear Generating Stations. Operational experience and licensing changes have indicated the desirability of improving reliability in certain instances. For example, the requirement to start large emergency coolant injection pumps resulted in the turbine generator units in a multi-unit station being used as a back-up power supply. Results of reliability analyses are discussed. To mitigate the effects of common mode events Ontario Hydro adopted a 'two group' approach to the design of safety related Systems. This 'two group' approach is reviewed and a single fully environmentally qualified standby power supply is proposed for future use. (author)

  1. IEC 61850: integrating substation automation into the power plant control system; IEC 61850: Integration der Schaltanlagenautomatisierung in die Kraftwerksleittechnik

    Energy Technology Data Exchange (ETDEWEB)

    Orth, J. [ABB AG, Mannheim (Germany)

    2008-07-01

    The new communication standard IEC 61850 has been developed in the substation automation domain and was released 2004 as a worldwide standard. Meanwhile IEC 61850 is already established in many substation automation markets. The paper discusses the implementation of IEC 61850 integrating process control and substation automation into one consistent system in a power plant. (orig.)

  2. Study on Earthquake Response of High Voltage Electrical Equipment Coupling System with Flexible Busbar

    Science.gov (United States)

    Liu, Chuncheng; Qu, Da; Wang, Chongyang; Lv, Chunlei; Li, Guoqiang

    2017-12-01

    With the rapid development of technology and society, all walks of life in China are becoming more and more dependent on power systems. When earthquake occurs, the electrical equipment of substation is prone to damage because of its own structural features, top-heavy, and brittleness of main body. At the same time, due to the complex coupling of the soft electrical connection of substation electrical equipment, the negative impact can not be estimated. In this paper, the finite element model of the coupling system of the single unit of high voltage electrical equipment with the connecting soft bus is established and the seismic response is analysed. The results showed that there is a significant difference between the simple analysis for the seismic response of electrical equipment monomer and the analytical results of electrical equipment systems, and the impact on different electrical equipment is different. It lays a foundation for the future development of seismic performance analysis of extra high voltage electrical equipment.

  3. 3D As-Built a documentation of the substation electrical power 400 KV; Documentacion 3D As-Built de una subestacion electrica de 400 KV

    Energy Technology Data Exchange (ETDEWEB)

    Sarti Fernandez, F.

    2011-07-01

    It's getting parameters of time, yields and products obtained, in order to have an objective reference to the possible application of this technique to substations of Red Electrica Espanola (REE).

  4. Application of Superconducting Power Cables to DC Electric Railway Systems

    Science.gov (United States)

    Ohsaki, Hiroyuki; Lv, Zhen; Sekino, Masaki; Tomita, Masaru

    For novel design and efficient operation of next-generation DC electric railway systems, especially for their substantial energy saving, we have studied the feasibility of applying superconducting power cables to them. In this paper it is assumed that a superconducting power cable is applied to connect substations supplying electric power to trains. An analysis model line was described by an electric circuit, which was analyzed with MATLAB-Simulink. From the calculated voltages and currents of the circuit, the regenerative brake and the energy losses were estimated. In addition, assuming the heat loads of superconducting power cables and the cryogenic efficiency, the energy saving of the total system was evaluated. The results show that the introduction of superconducting power cables could achieve the improved use of regenerative brake, the loss reduction, the decreased number of substations, the reduced maintenance, etc.

  5. S.I. 1987 No. 2182, The Electricity Generating Stations and Overhead Lines (Inquiries Procedure) Rules 1987

    International Nuclear Information System (INIS)

    1987-01-01

    These Rules, which came into force on 14 January 1988, make new provision for the procedure for any public inquiry held pursuant to Section 34 of the Electricity Act 1957 in relation to applications for consent to construct or extend a generating station (including nuclear stations). The Rules were made pursuant to Section 11 of the Tribunals and Inquiries Act 1971. They revoke the previous Electricity Generating Stations and Overhead Line (Inquiries Procedures) Rules 1981. These new Rules cover the same topics as the previous Rules but aim to shorten the potential length and thus cost of inquiries. They will apply to the Inquiry to be held into the application by the Central Electricity Generating Board to build a pressurised water reactor at Hinkley Point in Somerset. (NEA) [fr

  6. 2015 Plan. Project 7: the environmental issue and the electrical sector. Transmission systems

    International Nuclear Information System (INIS)

    1992-10-01

    The main impacts in socio-environmental analysis of transmission lines and substations for expansion of the Brazilian electrical sector are described, showing the actions of social compensation aiming a better insertion of the transmission lines and the substations. The issues relating with the natural and native reserves, the supply to the large consumer centers and the socio-environmental licensing of transmission enterprises are also discussed. (C.G.C.)

  7. Feasibility Study of a Solar-Powered Electric Vehicle Charging Station Model

    Directory of Open Access Journals (Sweden)

    Bin Ye

    2015-11-01

    Full Text Available In China, the power sector is currently the largest carbon emitter and the transportation sector is the fastest-growing carbon emitter. This paper proposes a model of solar-powered charging stations for electric vehicles to mitigate problems encountered in China’s renewable energy utilization processes and to cope with the increasing power demand by electric vehicles for the near future. This study applies the proposed model to Shenzhen City to verify its technical and economic feasibility. Modeling results showed that the total net present value of a photovoltaic power charging station that meets the daily electricity demand of 4500 kWh is $3,579,236 and that the cost of energy of the combined energy system is $0.098/kWh. In addition, the photovoltaic powered electric vehicle model has pollutant reduction potentials of 99.8%, 99.7% and 100% for carbon dioxide, sulfur dioxide, and nitrogen oxides, respectively, compared with a traditional gasoline-fueled car. Sensitivity analysis results indicated that interest rate has a relatively strong influence on COE (Cost of Energy. An increase in the interest rate from 0% to 6% increases COE from $0.027/kWh to $0.097/kWh. This analysis also suggests that carbon pricing promotes renewable energy only when the price of carbon is above $20/t.

  8. The Electric Fleet Size and Mix Vehicle Routing Problem with Time Windows and Recharging Stations

    DEFF Research Database (Denmark)

    Hiermann, Gerhard; Puchinger, Jakob; Røpke, Stefan

    2016-01-01

    Due to new regulations and further technological progress in the field of electric vehicles, the research community faces the new challenge of incorporating the electric energy based restrictions into vehicle routing problems. One of these restrictions is the limited battery capacity which makes...... detours to recharging stations necessary, thus requiring efficient tour planning mechanisms in order to sustain the competitiveness of electric vehicles compared to conventional vehicles. We introduce the Electric Fleet Size and Mix Vehicle Routing Problem with Time Windows and Recharging Stations (E......-FSMFTW) to model decisions to be made with regards to fleet composition and the actual vehicle routes including the choice of recharging times and locations. The available vehicle types differ in their transport capacity, battery size and acquisition cost. Furthermore, we consider time windows at customer...

  9. Regulatory Impacts on Distributed Generation and Upstream Transmission Substation Expansion Planning: A Novel Stochastic Bi-level Model

    Directory of Open Access Journals (Sweden)

    F. Misaghi

    2017-06-01

    Full Text Available In this paper, a novel framework is proposed to study impacts of regulatory incentive on distributed generation (DG investment in sub-transmission substations, as well as upgrading of upstream transmission substations. Both conventional and wind power technologies are considered here. Investment incentives are fuel cost, firm contracts, capacity payment and investment subsidy relating to wind power. The problem is modelled as a bi-level stochastic optimization problem, where the upper level consists of investor's decisions maximizing its own profit. Both market clearing and decision on upgrading of transmission substation aiming at minimizing the total cost are considered in the lower level. Due to non-convexity of the lower level and impossibility of converting to single level problem (i.e. mathematical programming with equilibrium constraints (MPEC, an algorithm combing enumeration and mathematical optimization is used to tackle with the non-convexity. For each upgrading strategy of substations, a stochastic MPEC, converted to a mixed integer linear programming (MILP is solved. The proposed model is examined on a six-bus and an actual network. Numerical studies confirm that the proposed model can be used for analysing investment behaviour of DGs and substation expansion.

  10. Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

    Science.gov (United States)

    Turnquist, S. R.; Twombly, M.; Hoffman, D.

    1989-01-01

    A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

  11. Uncertainty models applied to the substation planning

    Energy Technology Data Exchange (ETDEWEB)

    Fontoura Filho, Roberto N [ELETROBRAS, Rio de Janeiro, RJ (Brazil); Aires, Joao Carlos O; Tortelly, Debora L.S. [Light Servicos de Eletricidade S.A., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    The selection of the reinforcements for a power system expansion becomes a difficult task on an environment of uncertainties. These uncertainties can be classified according to their sources as exogenous and endogenous. The first one is associated to the elements of the generation, transmission and distribution systems. The exogenous uncertainly is associated to external aspects, as the financial resources, the time spent to build the installations, the equipment price and the load level. The load uncertainly is extremely sensible to the behaviour of the economic conditions. Although the impossibility to take out completely the uncertainty , the endogenous one can be convenient treated and the exogenous uncertainly can be compensated. This paper describes an uncertainty treatment methodology and a practical application to a group of substations belonging to LIGHT company, the Rio de Janeiro electric utility. The equipment performance uncertainty is treated by adopting a probabilistic approach. The uncertainly associated to the load increase is considered by using technical analysis of scenarios and choice criteria based on the Decision Theory. On this paper it was used the Savage Method and the Fuzzy Set Method, in order to select the best middle term reinforcements plan. (author) 7 refs., 4 figs., 6 tabs.

  12. Method and device allowing a more rational exploitation of electrical power-stations. [energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Mascarello, J

    1974-04-12

    Description is given of a device permitting a more rational exploitation of electrical power stations characterized by the fact that, while electric power available during slack hours is used for pressurizing air (the pressurized air being stored in tanks), the electric power available during slack days is used for generating hydrogen from water, the hydrogen being stored in other tanks. Combustion of the stored hydrogen by the stored air is used for generating electric power during electric power consumption peak-periods.

  13. Main unit electrical protection at Sizewell 'B' power station

    International Nuclear Information System (INIS)

    Fischer, A.; Keates, T.

    1992-01-01

    For any power station, reliable electrical protection of the main generating units (generators plus generator transformers) has important commercial implications. Spurious trips cause loss of generation and consequent loss of revenue, while failure to rapidly isolate a fault leads to unnecessary damage and again, loss of generation and revenue. While these conditions apply equally to Sizewell B there are additional factors to be taken into consideration. A spurious trip of a main generating unit may lead to a trip of the reactor with an associated challenge to the shutdown and core cooling plant. The generator transformers, besides exporting power from the generators to the 400 kV National Grid, also import power from the Grid to the 11 kV Main Electrical System, which in turn is the preferred source of supply to the Essential Electrical System. The Main Unit Protection is designed to clear generator faults leaving this off-site power route intact. Hence failure to operate correctly could affect the integrity of the Essential Electrical Supplies. (Author)

  14. 77 FR 52053 - Notice of Availability of the Record of Decision for San Diego Gas and Electric's East County...

    Science.gov (United States)

    2012-08-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-51625, LLCAD07000, L51010000, ER0000, LVRWB10B3800] Notice of Availability of the Record of Decision for San Diego Gas and Electric's East County...&E filed right-of-way (ROW) application CACA-51625 for the ECO Substation Project. The ECO Substation...

  15. A New Approach to Detection of Systematic Errors in Secondary Substation Monitoring Equipment Based on Short Term Load Forecasting

    Directory of Open Access Journals (Sweden)

    Javier Moriano

    2016-01-01

    Full Text Available In recent years, Secondary Substations (SSs are being provided with equipment that allows their full management. This is particularly useful not only for monitoring and planning purposes but also for detecting erroneous measurements, which could negatively affect the performance of the SS. On the other hand, load forecasting is extremely important since they help electricity companies to make crucial decisions regarding purchasing and generating electric power, load switching, and infrastructure development. In this regard, Short Term Load Forecasting (STLF allows the electric power load to be predicted over an interval ranging from one hour to one week. However, important issues concerning error detection by employing STLF has not been specifically addressed until now. This paper proposes a novel STLF-based approach to the detection of gain and offset errors introduced by the measurement equipment. The implemented system has been tested against real power load data provided by electricity suppliers. Different gain and offset error levels are successfully detected.

  16. Residential exposure from extremely low frequency electromagnetic field (ELF EMF) radiation

    Science.gov (United States)

    Parthasarathy, Shamesh Raj; Tukimin, Roha

    2018-01-01

    ELF EMF radiation have received considerable attention as a potential threat to the safety and health of people living in the vicinity of high voltage transmission lines, electric distribution substations, power stations and even in close proximity to electronics and electrical household appliances. The paper highlights the study on the ELF EMF safety assessment performed at residences comprising of an owner-occupied house, a completed vacant house and an under construction condominium. The objectives of this study were to determine the ELF EMF radiation exposure level from the high voltage transmission line, electric distribution substation, power station and electrical household appliances in the residences, and to assess the potential exposure received by the occupants at the assessed locations. The results were logged in the electric and magnetic field strength with the units of volt per meter (V/m) and miliGauss (mG) respectively. The instrument setup and measurement protocols during the assessment were adopted from standard measurement method and procedures stipulated under the Institute of Electrical and Electronics Engineers (IEEE) Standard. The results were compared with the standards recommended in the International Commission on Non-Ionizing Radiation Protection (ICNIRP) guidelines.

  17. The System of Fast Charging Station for Electric Vehicles with Minimal Impact on the Electrical Grid

    Directory of Open Access Journals (Sweden)

    Petr Chlebis

    2016-01-01

    Full Text Available The searching and utilization of new energy sources and technologies is a current trend. The effort to increase the share of electricity production from renewable energy sources is characteristic for economically developed countries. The use of accumulation of electrical energy with a large number of decentralized storage units is most preferred, as well as the focus on the production of energy at the point of its consumption. Modern cogeneration units are a good example. This paper describes the accumulation of electrical energy for equalizing the power balance of electric charging stations with high instantaneous power. The possibility of re-utilization of electrical energy from the charged vehicle in the case of lack of electricity in the power grid is solved at the same time. This paper also deals with the selection of appropriate concept of accumulation system and its cooperation with both renewable and distribution networks. Details of the main power components including the results obtained from the system implementation are also described in this paper.

  18. Improving nuclear generating station response for electrical grid islanding

    International Nuclear Information System (INIS)

    Chou, Q.B.; Kundur, P.; Acchione, P.N.; Lautsch, B.

    1989-01-01

    This paper describes problems associated with the performance characteristics of nuclear generating stations which do not have their overall plant control design functions co-ordinated with the other grid controls. The paper presents some design changes to typical nuclear plant controls which result in a significant improvement in both the performance of the grid island and the chances of the nuclear units staying on-line following the disturbance. This paper focuses on four areas of the overall unit controls and turbine governor controls which could be modified to better co-ordinate the control functions of the nuclear units with the electrical grid. Some simulation results are presented to show the performance of a typical electrical grid island containing a nuclear unit with and without the changes

  19. Technique on rationalization of using electricity and cases

    International Nuclear Information System (INIS)

    1988-04-01

    This book deals with rationalization of using electric and cases. It is divided into four parts. The first part introduces necessity and of progression rationalization of using electric. The second part describes the technique on rationalization of using electric with management of electric energy. The third part depicts domestic cases of rationalization on using of electric such as substation and motor. The last part also introduces foreign cases of rationalization on using of electric with measure of generator circuit, design of motor, design of lighting and design of other equipment.

  20. Multiple Charging Station Location-Routing Problem with Time Window of Electric Vehicle

    Directory of Open Access Journals (Sweden)

    Wang Li-ying

    2015-11-01

    Full Text Available This paper presents the electric vehicle (EV multiple charging station location-routing problem with time window to optimize the routing plan of capacitated EVs and the strategy of charging stations. In particular, the strategy of charging stations includes both infrastructure-type selection and station location decisions. The problem accounts for two critical constraints in logistic practice: the vehicle loading capacity and the customer time windows. A hybrid heuristic that incorporates an adaptive variable neighborhood search (AVNS with the tabu search algorithm for intensification was developed to address the problem. The specialized neighborhood structures and the selection methods of charging station used in the shaking step of AVNS were proposed. In contrast to the commercial solver CPLEX, experimental results on small-scale test instances demonstrate that the algorithm can find nearly optimal solutions on small-scale instances. The results on large-scale instances also show the effectiveness of the algorithm.

  1. Commerical electric power cost studies. Capital cost addendum multi-unit coal and nuclear stations

    International Nuclear Information System (INIS)

    1977-09-01

    This report is the culmination of a study performed to develop designs and associated capital cost estimates for multi-unit nuclear and coal commercial electric power stations, and to determine the distribution of these costs among the individual units. This report addresses six different types of 2400 MWe (nominal) multi-unit stations as follows: Two Unit PWR Station-1139 MWe Each, Two Unit BWR Station-1190 MWe Each, Two Unit High Sulfur Coal-Fired Station-1232 MWe Each, Two Unit Low Sulfur Coal-Fired Station-1243 MWe Each, Three Unit High Sulfur Coal-Fired Station-794 MWe Each, Three Unit Low Sulfur Coal-Fired Station-801 MWe Each. Recent capital cost studies performed for ERDA/NRC of single unit nuclear and coal stations are used as the basis for developing the designs and costs of the multi-unit stations. This report includes the major study groundrules, a summary of single and multi-unit stations total base cost estimates, details of cost estimates at the three digit account level and plot plan drawings for each multi-unit station identified

  2. Viability of conventional compact electric power substations in medium size cities - case study Sorocaba`s DTS; Viabilidade de subestacoes compactas convencionais em cidades de medio porte: caso pratico ETD Sorocaba

    Energy Technology Data Exchange (ETDEWEB)

    Guaraldo, N J; Goncalves, S M [Eletricidade de Sao Paulo SA, SP (Brazil); Sant` Anna, P B.E.; Fleury, V F; Moura Filho, W [CHROMA Engenharia (Brazil)

    1994-12-31

    This work presents the viability of compact transformers distributing power substations of in medium size cities, giving emphasis to three main aspects. The first aspect is generic and concerns the compactation economic viability, when compared to the conventional solution. The second, specific to the case of Sorocaba, in addition to present two compact disposal for the power substation, registers the opportunity for obtaining resources from the private enterprise. The third aspect takes into consideration the compatibility of technical proposals with the architecture of the cities. 2 refs., 10 figs., 1 tab.

  3. On the possibility of generation of cold and additional electric energy at thermal power stations

    Science.gov (United States)

    Klimenko, A. V.; Agababov, V. S.; Borisova, P. N.

    2017-06-01

    A layout of a cogeneration plant for centralized supply of the users with electricity and cold (ECCG plant) is presented. The basic components of the plant are an expander-generator unit (EGU) and a vapor-compression thermotransformer (VCTT). At the natural-gas-pressure-reducing stations, viz., gas-distribution stations and gas-control units, the plant is connected in parallel to a throttler and replaces the latter completely or partially. The plant operates using only the energy of the natural gas flow without burning the gas; therefore, it can be classified as a fuelless installation. The authors compare the thermodynamic efficiencies of a centralized cold supply system based on the proposed plant integrated into the thermal power station scheme and a decentralized cold supply system in which the cold is generated by electrically driven vapor-compression thermotransformers installed on the user's premises. To perform comparative analysis, the exergy efficiency was taken as the criterion since in one of the systems under investigation the electricity and the cold are generated, which are energies of different kinds. It is shown that the thermodynamic efficiency of the power supply using the proposed plant proves to be higher within the entire range of the parameters under consideration. The article presents the results of investigating the impact of the gas heating temperature upstream from the expander on the electric power of the plant, its total cooling capacity, and the cooling capacities of the heat exchangers installed downstream from the EGU and the evaporator of the VCTT. The results of calculations are discussed that show that the cold generated at the gas-control unit of a powerful thermal power station can be used for the centralized supply of the cold to the ventilation and conditioning systems of both the buildings of the power station and the neighboring dwelling houses, schools, and public facilities during the summer season.

  4. Design and Realization of a Condition Management System for the Gateway Electrical Energy Metering Device

    Directory of Open Access Journals (Sweden)

    Chao Tang

    2013-12-01

    Full Text Available With the construction of firm and intelligent power grid in China, it is difficult for the traditional management method of electrical energy metering device to meet the prospecting requirements. Using the computer and internet techniques to realize the information and intelligentization of the electrical energy metering management has become a necessary guarantee of improving power supply ability, marketing control, and customer service. This paper introduced a kind of large and intelligent condition management system of the gateway electrical energy metering device. The key technologies and realize process were analyzed. Moreover, a detailed description of the application modules such as the GIS smart display of metering point, the condition management of metering devices and the visual monitoring of metering point was presented. The trial operation in the selected transformer substations and the power stations of Chongqing Power Electrical Corp. indicated that, the condition management system is very open, safety and efficient. According to the data exchange with the production and scheduling platform, the system improved the efficient operation of the electrical energy metering devices. Meanwhile, combined with the real-time visual monitoring, the condition management system improved the prevention ability of electricity filching, realized the unified automatic large-scale management of electrical energy metering devices.

  5. An improved method for predicting the lightning performance of high and extra-high-voltage substation shielding

    Science.gov (United States)

    Vinh, T.

    1980-08-01

    There is a need for better and more effective lightning protection for transmission and switching substations. In the past, a number of empirical methods were utilized to design systems to protect substations and transmission lines from direct lightning strokes. The need exists for convenient analytical lightning models adequate for engineering usage. In this study, analytical lightning models were developed along with a method for improved analysis of the physical properties of lightning through their use. This method of analysis is based upon the most recent statistical field data. The result is an improved method for predicting the occurrence of sheilding failure and for designing more effective protection for high and extra high voltage substations from direct strokes.

  6. Optimal planning of electric vehicle charging station at the distribution system using hybrid optimization algorithm

    DEFF Research Database (Denmark)

    Awasthi, Abhishek; Venkitusamy, Karthikeyan; Padmanaban, Sanjeevikumar

    2017-01-01

    India's ever increasing population has made it necessary to develop alternative modes of transportation with electric vehicles being the most preferred option. The major obstacle is the deteriorating impact on the utility distribution system brought about by improper setup of these charging...... stations. This paper deals with the optimal planning (siting and sizing) of charging station infrastructure in the city of Allahabad, India. This city is one of the upcoming smart cities, where electric vehicle transportation pilot project is going on under Government of India initiative. In this context......, a hybrid algorithm based on genetic algorithm and improved version of conventional particle swarm optimization is utilized for finding optimal placement of charging station in the Allahabad distribution system. The particle swarm optimization algorithm re-optimizes the received sub-optimal solution (site...

  7. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  8. Electric Vehicle Fast-Charging Station Unified Modeling and Stability Analysis in the dq Frame

    Directory of Open Access Journals (Sweden)

    Xiang Wang

    2018-05-01

    Full Text Available The electric vehicle fast-charging station is an important guarantee for the popularity of electric vehicle. As the fast-charging piles are voltage source converters, stability issues will occur in the grid-connected fast-charging station. Since the dynamic input admittance of the fast-charging pile and the dynamic output impedance play an important role in the interaction system stability, the station and grid interaction system is regarded as load-side and source-side sub-systems to build the dynamic impedance model. The dynamic input admittance in matrix form is derived from the fast-charging pile current control loop considering the influence of the LC filter. Similarly, the dynamic output impedance can be obtained similarly by considering the regional power grid capacity, transformer capacity, and feed line length. On this basis, a modified forbidden region-based stability criterion is used for the fast-charging station stability analysis. The frequency-domain case studies and time-domain simulations are presented next to show the influence of factors from both the power grid side and fast-charging pile side. The simulation results validated the effectiveness of the dq frame impedance model and the stability analysis method.

  9. Algorithms for the evaluation of the reliability of networks and substations; Algoritmos para evaluar la confiabilidad de redes y subestaciones electricas

    Energy Technology Data Exchange (ETDEWEB)

    Vega Ortiz, Miguel [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2001-07-01

    Two algorithms are presented, one for analyzing the reliability of networks and another one to analyzing the reliability of electrical substations. The algorithms model a network or a substation by means of a graph and determine all the exits, of up to third degree, which isolates the load points. The algorithm that is used for the network analysis, is the one of p-cuts and in the case of the substations it is the one of minimum ways, for later, from these minimum p-cuts and of the minimum ways, obtains the minimum cuts. These minimum cuts are evaluated with the approximate method and give as a result the system reliability and of each one of the components that have been modeled. At the end some examples and results obtained are shown. As case of study, the algorithm is applied to two substations arrangements and to a network of industrial distribution, but it is possible to be applied to transmission and distribution networks. [Spanish] Se presentan dos algoritmos, uno para analizar la confiabilidad de redes y otro para analizar la confiabilidad de subestaciones electricas. Los algoritmos modelan una red o una subestacion por medio de un grafo y determinan todas las salidas, de hasta tercer grado, que aislan los puntos de carga. El algoritmo que se utiliza para el analisis de redes, es el de p-cortes y en el caso de las subestaciones es el de caminos minimos, para despues, a partir de estos p-cortes minimos y de los caminos minimos, obtener los cortes minimos. Estos cortes minimos se evaluan con el metodo aproximado y dan como resultado la confiabilidad del sistema y de cada una de las componentes que se hayan modelado. Al final se muestran algunos ejemplos y resultados obtenidos. Como caso de estudio, el algoritmo se aplica a dos arreglos de subestaciones y a una red de distribucion industrial, pero se puede aplicar a redes de transmision y de distribucion.

  10. THE MATHEMATIC STIMULATION OF TRANSIENT PROCESS IN A.C. – SYSTEM “ELECTRIC-TRACTION NETWORK – LOCOMOTIVE” 3. SWITCHING ON MAIN POWER CONVERTER IN “FREE PLAY” MODE; THE ANALYSIS OF VOLTS AND CURRENTS IN THE POWER SUPPLY INPUT SYSTEM

    OpenAIRE

    T. M. Mischenko

    2011-01-01

    The article is a continuation of analysis of the electric equivalent AC circuit «traction substation − device of transversal compensation − electric-traction network − electric locomotive DS 3» and the influence on a power transformer in the idle mode, depending on the feeder voltage and the distance of an electric locomotive from a traction substation. The numeral calculations are performed and the voltage and current values in the electric power supply system are analyzed.

  11. Considering the dynamic refueling behavior in locating electric vehicle charging stations

    Science.gov (United States)

    Liu, K.; Sun, X. H.

    2014-11-01

    Electric vehicles (EVs) will certainly play an important role in addressing the energy and environmental challenges at current situation. However, location problem of EV charging stations was realized as one of the key issues of EVs launching strategy. While for the case of locating EV charging stations, more influence factors and constraints need to be considered since the EVs have some special attributes. The minimum requested charging time for EVs is usually more than 30minutes, therefore the possible delay time due to waiting or looking for an available station is one of the most important influence factors. In addition, the intention to purchase and use of EVs that also affects the location of EV charging stations is distributed unevenly among regions and should be considered when modelling. Unfortunately, these kinds of time-spatial constraints were always ignored in previous models. Based on the related research of refuelling behaviours and refuelling demands, this paper developed a new concept with dual objectives of minimum waiting time and maximum service accessibility for locating EV charging stations - named as Time-Spatial Location Model (TSLM). The proposed model and the traditional flow-capturing location model are applied on an example network respectively and the results are compared. Results demonstrate that time constraint has great effects on the location of EV charging stations. The proposed model has some obvious advantages and will help energy providers to make a viable plan for the network of EV charging stations.

  12. Network reconfiguration for loss reduction in electrical distribution system using genetic algorithm

    International Nuclear Information System (INIS)

    Adail, A.S.A.A.

    2012-01-01

    Distribution system is a critical links between the utility and the nuclear installation. During feeding electricity to that installation there are power losses. The quality of the network depends on the reduction of these losses. Distribution system which feeds the nuclear installation must have a higher quality power. For example, in Inshas site, electrical power is supplied to it from two incoming feeders (one from new abu-zabal substation and the other from old abu-zabal substation). Each feeder is designed to carry the full load, while the operator preferred to connect with a new abu-zabal substation, which has a good power quality. Bad power quality affects directly the nuclear reactor and has a negative impact on the installed sensitive equipment's of the operation. The thesis is Studying the electrical losses in a distribution system (causes and effected factors), feeder reconfiguration methods, and applying of genetic algorithm in an electric distribution power system. In the end, this study proposes an optimization technique based on genetic algorithms for distribution network reconfiguration to reduce the network losses to minimum. The proposed method is applied to IEEE test network; that contain 3 feeders and 16 nodes. The technique is applied through two groups, distribution have general loads, and nuclear loads. In the groups the technique applied to seven cases at normal operation state, system fault condition as well as different loads conditions. Simulated results are drawn to show the accuracy of the technique.

  13. Lewis Research Center space station electric power system test facilities

    Science.gov (United States)

    Birchenough, Arthur G.; Martin, Donald F.

    1988-01-01

    NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.

  14. Study on the system-level test method of digital metering in smart substation

    Science.gov (United States)

    Zhang, Xiang; Yang, Min; Hu, Juan; Li, Fuchao; Luo, Ruixi; Li, Jinsong; Ai, Bing

    2017-03-01

    Nowadays, the test methods of digital metering system in smart substation are used to test and evaluate the performance of a single device, but these methods can only effectively guarantee the accuracy and reliability of the measurement results of a digital metering device in a single run, it does not completely reflect the performance when each device constitutes a complete system. This paper introduced the shortages of the existing test methods. A system-level test method of digital metering in smart substation was proposed, and the feasibility of the method was proved by the actual test.

  15. Overview of electrical energy in September 2003

    International Nuclear Information System (INIS)

    2003-01-01

    exchanges recorded by RTE (contracts for access to international connections). Transmission network development (the following facilities were commissioned on the RTE network in September 2003): the 90 kV substation at Trevins, connected to the substation at Niort via a 5 km underground cable, for guaranteeing the security of electricity supply to the North-Eastern area of Niort; the 63 kV substation at Arnay Le Duc on the Cote d'Or, connected by an 18 km line to the main 63 kV Crugey-Vielmoulin artery, for relieving restrictions on the zone's HVA networks; a 170 MVA 225/90 kV transformer at the La Corbiere substation - replacing a 100 MVA transformer - for strengthening the EHV/HV supply to the Anjou region; a 90 kV/MV transformer at the Tilleul substation, to improve the quality of supply to the Evreux region

  16. Novel Battery Thermal Management System for Greater Lifetime Ratifying Current Quality and Safety Standard

    DEFF Research Database (Denmark)

    Khan, Mohammad Rezwan; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    Temperature excursions and non-uniformity of the temperature inside the battery systems are the main concern and drawback for any attempt to scale-up battery cells to the larger sizes as required for high power applications. The applications may include electric generating stations, substations, ...

  17. THE MATHEMATIC STIMULATION OF TRANSIENT PROCESS IN A.C. – SYSTEM “ELECTRIC-TRACTION NETWORK – LOCOMOTIVE” 3. SWITCHING ON MAIN POWER CONVERTER IN “FREE PLAY” MODE; THE ANALYSIS OF VOLTS AND CURRENTS IN THE POWER SUPPLY INPUT SYSTEM

    Directory of Open Access Journals (Sweden)

    T. M. Mischenko

    2011-05-01

    Full Text Available The article is a continuation of analysis of the electric equivalent AC circuit «traction substation − device of transversal compensation − electric-traction network − electric locomotive DS 3» and the influence on a power transformer in the idle mode, depending on the feeder voltage and the distance of an electric locomotive from a traction substation. The numeral calculations are performed and the voltage and current values in the electric power supply system are analyzed.

  18. Pervasive Electricity Distribution System

    Directory of Open Access Journals (Sweden)

    Muhammad Usman Tahir

    2017-06-01

    Full Text Available Now a days a country cannot become economically strong until and unless it has enough electrical power to fulfil industrial and domestic needs. Electrical power being the pillar of any country’s economy, needs to be used in an efficient way. The same step is taken here by proposing a new system for energy distribution from substation to consumer houses, also it monitors the consumer consumption and record data. Unlike traditional manual Electrical systems, pervasive electricity distribution system (PEDS introduces a fresh perspective to monitor the feeder line status at distribution and consumer level. In this system an effort is taken to address the issues of electricity theft, manual billing, online monitoring of electrical distribution system and automatic control of electrical distribution points. The project is designed using microcontroller and different sensors, its GUI is designed in Labview software.

  19. New model of inverting substation for DC traction with regenerative braking system

    Science.gov (United States)

    Omar, Abdul Malek Saidina; Samat, Ahmad Asri Abd; Isa, Siti Sarah Mat; Shamsuddin, Sarah Addyani; Jamaludin, Nur Fadhilah; Khyasudeen, Muhammad Farris

    2017-08-01

    This paper presents a power electronic devices application focus on modeling, analysis, and control of switching power converter in the inverting DC substation with regenerative braking system which is used to recycle the surplus regenerative power by feed it back to the main AC grid. The main objective of this research is to improve the switching power electronic converter of the railway inverting substation and optimize the maximum kinetic energy recovery together with minimum power losses from the railway braking system. Assess performance including efficiency and robustness will be evaluated in order to get the best solution for the design configuration. Research methodology included mathematical calculation, simulation, and detail analysis on modeling of switching power converter on inverting substation. The design stage separates to four main areas include rectification mode, regenerative mode, control inverter mode and filtering mode. The simulation result has shown that the regenerative inverter has a capability to accept a maximum recovery power on the regeneration mode. Total energy recovery has increase and power losses have decreases because inverter abilities to transfer the surplus energy back to the main AC supply. An Inverter controller with PWM Generator and PI Voltage Regulator has been designed to control voltage magnitude and frequency of the DC traction system.

  20. optimization design of ground grid mesh of 132/33kv substation

    African Journals Online (AJOL)

    user

    INTRODUCTION. Grounding system for transmission substation is very ... drop will occur in mesh which will result in rise of mesh potentials ... minimize the effectiveness of transient voltage. ..... and Grounding in HC and LV Distribution System,.

  1. Wind-powered electrical systems : highway rest areas, weigh stations, and team section buildings.

    Science.gov (United States)

    2009-02-01

    This project considered the use of wind for providing electrical power at Illinois Department of Transportation : (IDOT) highway rest areas, weigh stations, and team section buildings. The goal of the project was to determine : the extent to which wi...

  2. Decentralized energy management strategy based on predictive controllers for a medium voltage direct current photovoltaic electric vehicle charging station

    International Nuclear Information System (INIS)

    Torreglosa, Juan P.; García-Triviño, Pablo; Fernández-Ramirez, Luis M.; Jurado, Francisco

    2016-01-01

    Highlights: • Electric vehicle charging station supplied by photovoltaic, batteries and grid connection is analyzed. • The bus voltage is the key parameter for controlling the system by decentralized approach. • Decentralized control approach facilities the enlargement of the system. • Photovoltaic and battery systems are controlled by model predictive controllers. • Response by model predictive controllers improves that by PI controllers. - Abstract: The use of distributed charging stations based on renewable energy sources for electric vehicles has increased in recent years. Combining photovoltaic solar energy and batteries as energy storage system, directly tied into a medium voltage direct current bus, and with the grid support, results to be an interesting option for improving the operation and efficiency of electric vehicle charging stations. In this paper, an electric vehicle charging station supplied by photovoltaic solar panels, batteries and with grid connection is analysed and evaluated. A decentralized energy management system is developed for regulating the energy flow among the photovoltaic system, the battery and the grid in order to achieve the efficient charging of electric vehicles. The medium voltage direct current bus voltage is the key parameter for controlling the system. The battery is controlled by a model predictive controller in order to keep the bus voltage at its reference value. Depending on the state-of-charge of the battery and the bus voltage, the photovoltaic system can work at maximum power point tracking mode or at bus voltage sustaining mode, or even the grid support can be needed. The results demonstrate the proper operation and energy management of the electric vehicle charging station under study.

  3. Analysis, simulation and control of electromagnetic transients in gas insulated substations in SF6 by means of grounding grid; Analisis, simulacion y control de transitorios electromagneticos en subestaciones aisladas en SF6 por medio de redes de tierra

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez Martinez, Gaston

    2007-12-15

    The use of SF6 substations is actually an extensive practice in industrial countries. Some of they replace conventional air substations and the others are new designs in the range of 34.5 kV to 1000 kV. During the switching events in a GIS substation, very fast transients overvoltage may appear and originate faults, malfunctions in the electronic and control equipment, besides the risk by electrical discharge in the personnel who are working in the substation. These overvoltage are produced by the collapse of the electric field on GIS terminals during switching events originating Very Fast Transient Overvoltage (VFTO) and the increase of the Transient Enclosure Voltage (TEV). This investigation is focused on diminishing the magnitude of the VFTO and TEV by designing and redesigning grounding grids for gas insulated substations in SF6. The objective of this work is to design a grounding grid for an air substation and redesign it for a GIS substation. The computer simulation uses a detailed model of the substation in SF6 interconnected with an aerial grounding grid and by adding methodologically grounding rods, the VFTO and TEV within the GIS are reduced. The results of the computer simulation show that the designed grounding grid allows considerably diminishing the magnitude of the VFTO; nevertheless this design doesn't appropriately attenuate the TEV magnitude. [Spanish] Hoy en dia, el uso de subestaciones GIS se ha generalizado. Algunas reemplazan a las subestaciones aereas y otras son de nueva creacion y se instalan en tensiones de 34.5kV hasta 1000 kV. Durante las operaciones de maniobra de la subestacion GIS, se presentan sobretensiones transitorias ultra rapidas que pueden dar origen a diversas fallas, a un malfuncionamiento del equipo electronico y de control asi como el riesgo por descarga electrica al personal que labora en la subestacion. Estas sobretensiones se producen debido al colapso del campo electrico en terminales del interruptor ante

  4. Assessment of the use of vanadium redox flow batteries for energy storage and fast charging of electric vehicles in gas stations

    International Nuclear Information System (INIS)

    Cunha, Álvaro; Brito, F.P.; Martins, Jorge; Rodrigues, Nuno; Monteiro, Vitor; Afonso, João L.; Ferreira, Paula

    2016-01-01

    A network of conveniently located fast charging stations is one of the possibilities to facilitate the adoption of Electric Vehicles (EVs). This paper assesses the use of fast charging stations for EVs in conjunction with VRFBs (Vanadium Redox Flow Batteries). These batteries are charged during low electricity demand periods and then supply electricity for the fast charging of EVs during day, thus implementing a power peak shaving process. Flow batteries have unique characteristics which make them especially attractive when compared with conventional batteries, such as their ability to decouple rated power from rated capacity, as well as their greater design flexibility and nearly unlimited life. Moreover, their liquid nature allows their installation inside deactivated underground gas tanks located at gas stations, enabling a smooth transition of gas stations' business model towards the emerging electric mobility paradigm. A project of a VRFB system to fast charge EVs taking advantage of existing gas stations infrastructures is presented. An energy and cost analysis of this concept is performed, which shows that, for the conditions tested, the project is technologically and economically viable, although being highly sensitive to the investment costs and to the electricity market conditions. - Highlights: • Assessment of Vanadium Redox Flow Battery use for EV fast charge in gas stations. • This novel system proposal allows power peak shaving and use of deactivated gas tanks. • Philosophy allows seamless business transition towards the Electric Mobility paradigm. • Project is technologically and economically viable, although with long payback times. • Future Cost cuts due to technology maturation will consolidate project attractiveness.

  5. Assessment of environmental effects on Space Station Freedom Electrical Power System

    Science.gov (United States)

    Lu, Cheng-Yi; Nahra, Henry K.

    1991-01-01

    Analyses of EPS (electrical power system) interactions with the LEO (low earth orbit) environment are described. The results of these analyses will support EPS design so as to be compatible with the natural and induced environments and to meet power, lifetime, and performance requirements. The environmental impacts to the Space Station Freedom EPS include aerodynamic drag, atomic oxygen erosion, ultraviolet degradation, VXB effect, ionizing radiation dose and single event effects, electromagnetic interference, electrostatic discharge, plasma interactions (ion sputtering, arcing, and leakage current), meteoroid and orbital debris threats, thermal cycling effects, induced current and voltage potential differences in the SSF due to induced electric field, and contamination degradation.

  6. Electric system training with programmable controllers

    International Nuclear Information System (INIS)

    Benson, M.B.

    1989-01-01

    A power system simulator (PSS) for training system operators has been opened at the Pacific Gas and Electric Training Center at San Ramon, California. The simulator was designed as an instructional aid and is part of a larger, more comprehensive operating training facility. It has the capability of duplicating both routine and emergency situations for transmission and distribution lines, power plants, and substations. Modeled after nuclear plant simulators, the PSS utilizes state-of-the-art technology and is believed to be on the leading edge of power system simulators. The new operator training facility covers 10,000 ft/sup 2/ and is divided into four classrooms, two labs, three simulated dispatch centers, and various administrative offices. Ten full- and part-time instructors are on staff to train the over 900 system, power plant, agency, and trainee personnel. The simulator is considered the heart of the complex and covers over half of the available floor space. It is divided into two large rooms and further separated by the dispatch centers. The indoor room represents the high-voltage transmission and generating stations, the outdoor room is for both the lower-voltage distribution system and simulated physical equipment. In each room, full-size control boards (equipped with actual relay protection and automatic schemes) are arranged into various stations and lines

  7. Efficiency of Health Care Sector at Sub-State Level in India: A Case of Punjab

    Directory of Open Access Journals (Sweden)

    Brijesh C. Purohit

    2009-11-01

    Full Text Available In recent years, WHO and other individual researchers have advocated estimation of health system performance through stochastic frontier models. It provides an idealized yardstick to evaluate economic performance of health system. So far attempts in India have remained focused at state level analysis. This paper attempts a sub-state level analysis for an affluent Indian state, namely Punjab, by using stochastic frontier technique. Our results provide pertinent insight into state health system and facilitate health facility planning at the sub-state level. Carried out in two stages of estimation, our results suggest that life expectancy in the Indian state could be enhanced considerably by correcting the factors that are adversely influencing the sub-state level health system efficiency. A higher budgetary allocation for health manpower is recommended by us to improve efficiency in poorly performing districts. This may be supported by policy initiatives outside the health system by empowering women through better education and work participation.

  8. System impact assessment report 115 kV interconnection between Cornwall system and Hydro One : final report

    International Nuclear Information System (INIS)

    2005-01-01

    Cornwall Electric (CE) is the local distribution company that serves the City of Cornwall, Ontario. The utility can be supplied from either Hydro Quebec, New York ISO or the IESO. CE has proposed to connect Rosemount, McConnell and Courtaulds substations to the IESO-controlled grid in order to obtain access to the competitively priced electricity in Ontario. The load connected to the 2 substations peaks in winter at about 100 MW. The 2 substations will be connected in stages. Only 40 MW of load from the Rosemount substation will be connected initially, followed by up to 100 MW from the McConnell and Courtaulds substation at a later date. The connection will be made through a circuit that taps into the St. Lawrence transmission station in Ontario. A new circuit will also be built and strung on existing towers. This document described the requirements for under-frequency load shedding; voltage reduction facilities; power factor; on-line monitoring; and system protections. According to data provided by Hydro One, the circuit is adequately rated to accommodate connection of the load from the Rosemount and McConnell and Courtaulds substations with no thermal overloading concerns. Winter load conditions were also considered. However, the IESO noted a potential reliability concern in the event that the Cardinal Power generating station is out of service and only one of the transformers connecting St. Lawrence 230 kV bus to St. Lawrence 115 kV bus is in service. However, the power transfers rated at 250 MVA are within the continuous rating of one transformer. It was concluded that the connection of the new load does not have an impact on the short circuit current at the St. Lawrence transmission station. The continuous thermal rating of the circuit is considered to be adequate for the proposed 100 MW of load transfer and the rating of the new line is sufficient to supply the total load at McConnell and Courtaulds. The ratings of the new disconnect switches meet market

  9. A new test procedure to evaluate the performance of substations for collective heating systems

    Science.gov (United States)

    Baetens, Robin; Verhaert, Ivan

    2017-11-01

    The overall heat demand of a single dwelling, existing out of space heating and domestic hot water production, decreases due to higher insulation rates. Because of this, investing in efficient and renewable heat generation becomes less interesting. Therefore, to incorporate renewables or residual heat on a larger scale, district heating or collective heating systems grow in importance. Within this set-up, the substation is responsible for the interaction between local demand for comfort and overall energy performance of the collective heating system. Many different configurations of substations exist, which influence both local comfort and central system performance. Next to that, also hybrids exist with additional local energy input. To evaluate performance of such substations, a new experimental-based test procedure is developed in order to evaluate these different aspects, characterized by the two roles a substation has, namely as heat generator and as heat consumer. The advantage of this approach is that an objective comparison between individual and central systems regarding performance on delivering local comfort can be executed experimentally. The lab set-up consists out of three different subsystems, namely the central system, the domestic hot water consumption and the local space heating. The central system can work with different temperature regimes and control strategies, as these aspects have proven to have the largest influence on actual performance. The domestic hot water system is able to generate similar tap profiles according to eco-design regulation for domestic hot water generation. The space heating system is able to demand a modular heat load.

  10. A new test procedure to evaluate the performance of substations for collective heating systems

    Directory of Open Access Journals (Sweden)

    Baetens Robin

    2017-01-01

    Full Text Available The overall heat demand of a single dwelling, existing out of space heating and domestic hot water production, decreases due to higher insulation rates. Because of this, investing in efficient and renewable heat generation becomes less interesting. Therefore, to incorporate renewables or residual heat on a larger scale, district heating or collective heating systems grow in importance. Within this set-up, the substation is responsible for the interaction between local demand for comfort and overall energy performance of the collective heating system. Many different configurations of substations exist, which influence both local comfort and central system performance. Next to that, also hybrids exist with additional local energy input. To evaluate performance of such substations, a new experimental-based test procedure is developed in order to evaluate these different aspects, characterized by the two roles a substation has, namely as heat generator and as heat consumer. The advantage of this approach is that an objective comparison between individual and central systems regarding performance on delivering local comfort can be executed experimentally. The lab set-up consists out of three different subsystems, namely the central system, the domestic hot water consumption and the local space heating. The central system can work with different temperature regimes and control strategies, as these aspects have proven to have the largest influence on actual performance. The domestic hot water system is able to generate similar tap profiles according to eco-design regulation for domestic hot water generation. The space heating system is able to demand a modular heat load.

  11. Ergonomics work stations decreases the health impairment and saves electrical energy at the woodworking workshop in Bali, Indonesia.

    Science.gov (United States)

    Sudiajeng, Lilik; Adiputra, Nyoman; Leibbrandt, Richard

    2012-12-01

    This research was conducted to assess the positive effect of the ergonomics work station on the health impairment and electrical energy usage at the woodworking workshop in Bali, Indonesia. Woodworking workshops are dangerous, particularly when they are used improperly. Workers are exposed to health hazards that cause health impairment and inefficiencies in their work conditions. A preliminary study at a woodworking workshop at the Bali State Polytechnic showed that the work station was not suitable to body size of the participants and caused awkward postures. In addition, there was also an inappropriate physical work environment. Both inappropriate work station and physical work environment caused participants to be less active and motivated. This paper reports on an experimental study into the effects of an ergonomic intervention at this workshop. The participants were 2 groups of male students with 10 participants in each group. The first group performed the task with the original work station as a control group, while the second group performed the task with the new work station. The study found a significant difference between groups (p work station decreased the working heart rate (16.7%), the total score of musculoskeletal disorders (17.3%), and the total score of psychological fatigue (21.5%). Furthermore, it also decreased the electrical energy usage (38.7%). This shows that an ergonomics intervention on work station decreased the health impairment and saved electrical energy usage. It also protected the workers from woodworking hazards and allowed participants to perform their tasks in healthy, safe, convenient and efficient work conditions.

  12. MATHEMATIC SIMULATION OF TRANSIENT PROCESS IN A.C. – SYSTEM “ELECTRIC TRACTION NETWORK – LOCOMOTIVE” 1. SWITCH ON LOCOMOTIVE’S POWER CONVERTER IN “FREE PLAY” MODE; PARAMETERS ESTIMATION

    OpenAIRE

    T. M. Mishchenko; A. I. Kiiko

    2010-01-01

    In the article the electric circuit of substitution and mathematical model of the system of alternating current «traction substation − traction mains − electric locomotive DS 3» at switching its power transformer on in the idle mode are presented. Numerical determinations of parameters of traction substation, rails, contact network and transformer are executed; in so doing a special attention is paid to the estimation of dispersion inductance for the primary winding of transformer.

  13. Mortality of persons resident in the vicinity of electricity transmission facilities

    Energy Technology Data Exchange (ETDEWEB)

    McDowall, M E

    1986-02-01

    Several studies have raised the possibility that exposure to electrical and/or magnetic fields may be injurious to health in particular by the promotion or initiation of cancer. To investigate whether the electricity transmission system presents a long term hazard to public health, the mortality of nearly 8,000 persons, identified as living in the vicinity of electrical transmission facilities at the time of the 1971 Population Census, has been followed to the end of 1983. All identified transmission installations within pre-defined areas were included in the study with the result that the greater part of the study group were believed to be resident near relatively low voltage sub-stations. Overall mortality was lower than expected and no evidence of major health hazards emerged. The only statistically significant excess mortality was for lung cancer (in women overall, and in persons living closest to the installations); this result is difficult to interpret in the absence of smoking data, and is not supported by other evidence but does not appear to be due to the social class distribution of the study group. The study did not support previously reported associations of exposure to electro-magnetic fields with acute myeloid leukaemia, other lymphatic cancers and suicide.

  14. 78 FR 50405 - Amended Application for Presidential Permit; Northern Pass Transmission LLC

    Science.gov (United States)

    2013-08-19

    ... Pass proposes to construct and operate a primarily overhead high-voltage direct current (HVDC) electric transmission line that would originate at an HVDC converter station to be constructed at the Des Cantons Substation in Qu[eacute]bec, Canada, then would be converted from HVDC to alternating current (AC) in...

  15. Assessment of occupational exposure to magnetic fields in high-voltage substations (154/34.5 kV)

    International Nuclear Information System (INIS)

    Helhel, S.; Ozen, S.

    2008-01-01

    This work proposes the survey of magnetic field measurements taken in 154/31.5 kV substations in the city of Antalya for occupational exposure assessment. For measurements, three substations have been taken into account, where four occupants are present for each 8 h of shift, which means 12 occupants are present during the day. Operator desks at three different substations read a lowest magnetic field of 0.3 μT at minimum loaded season and reached up to 1 μT at maximum loaded season, which means operators exposed to a magnetic field of ≥ 0.3 μT 8 h d -1 . In switch gear regions, maximum magnetic field reading is 23 μT at minimum loaded season and reached up to 70 μT. Outdoor magnetic field measurement at circuit breaker region goes up to 62 μT with respect to operator heights. (authors)

  16. Ground potential rise on the high voltage substation during lightning strike measurement and simulation results

    Energy Technology Data Exchange (ETDEWEB)

    Wiater, Jaroslaw [Bialystok Technical University (Poland). Electrical Dept.], E-mail: jaroslawwiater@we.pb.edu.pl

    2007-07-01

    This paper will present a ground potential rise (GPR) measurement results. All measurements were made during normal work of the real high voltage substation and according a special procedure developed for this occasion. This procedure does not influence on the protection relays and ensures a proper work of the substation even for 6 kV surges. During measurements current and voltage surges were produced by the impulse generator - UCS 500M6B. Measurement results are compared to simulation results performed in CDEGS software for the same initial conditions. (author)

  17. Managing operations of plug-in hybrid electric vehicle (PHEV) exchange stations for use with a smart grid

    International Nuclear Information System (INIS)

    Nurre, Sarah G.; Bent, Russell; Pan, Feng; Sharkey, Thomas C.

    2014-01-01

    We consider a deterministic integer programming model for determining the optimal operations of multiple plug-in hybrid electric vehicle (PHEV) battery exchange stations over time. The operations include the number of batteries to charge, discharge, and exchange at each point in time over a set time horizon. We allow discharging of batteries back to the power grid, through vehicle-to-grid technology. We incorporate the exchange station's dependence on the power network, transportation network, and other exchange stations. The charging and discharging at these exchange stations lead to a greater amount of variability which creates a less predictable and flat power generation curve. We introduce and test three policies to smooth the power generation curve by balancing its load. Further, tests are conducted evaluating these policies while factoring wind energy into the power generation curve. These computational tests use realistic data and analysis of the results suggest general operating procedures for exchange stations and evaluate the effectiveness of these power flattening policies. - Highlights: • Model the operations of plug-in hybrid electric vehicle battery exchange stations. • Determine the optimal and general charging, discharging, and exchange operations. • Conclude that forced customer service levels are unnecessary with proper pricing. • Examine policies to reduce variability in power generation from PHEVs and wind. • Observe that strict constraints on exchange stations best reduce variability

  18. MATHEMATIC SIMULATION OF TRANSIENT PROCESS IN A.C. – SYSTEM “ELECTRIC TRACTION NETWORK – LOCOMOTIVE” 1. SWITCH ON LOCOMOTIVE’S POWER CONVERTER IN “FREE PLAY” MODE; PARAMETERS ESTIMATION

    Directory of Open Access Journals (Sweden)

    T. M. Mishchenko

    2010-11-01

    Full Text Available In the article the electric circuit of substitution and mathematical model of the system of alternating current «traction substation − traction mains − electric locomotive DS 3» at switching its power transformer on in the idle mode are presented. Numerical determinations of parameters of traction substation, rails, contact network and transformer are executed; in so doing a special attention is paid to the estimation of dispersion inductance for the primary winding of transformer.

  19. A technological review on electric vehicle DC charging stations using photovoltaic sources

    Science.gov (United States)

    Youssef, Cheddadi; Fatima, Errahimi; najia, Es-sbai; Chakib, Alaoui

    2018-05-01

    Within the next few years, Electrified vehicles are destined to become the essential component of the transport field. Consequently, the charging infrastructure should be developed in the same time. Among this substructure, Charging stations photovoltaic-assisted are attracting a substantial interest due to increased environmental awareness, cost reduction and rise in efficiency of the PV modules. The intention of this paper is to review the technological status of Photovoltaic–Electric vehicle (PV-EV) charging stations during the last decade. The PV-EV charging station is divided into two categories, which are PV-grid and PV-standalone charging systems. From a practical point view, the distinction between the two architectures is the bidirectional inverter, which is added to link the station to the smart grid. The technological infrastructure includes the common hardware components of every station, namely: PV array, dc-dc converter provided with MPPT control, energy storage unit, bidirectional dc charger and inverter. We investigate, compare and evaluate many valuable researches that contain the design and control of PV-EV charging system. Additionally, this concise overview reports the studies that include charging standards, the power converters topologies that focus on the adoption of Vehicle-to grid technology and the control for both PV–grid and PV standalone DC charging systems.

  20. Evaluations of different domestic hot water preparing methods with ultra-low-temperature district heating

    International Nuclear Information System (INIS)

    Yang, Xiaochen; Li, Hongwei; Svendsen, Svend

    2016-01-01

    This study investigated the performances of five different substation configurations in single-family houses supplied with ULTDH (ultra-low-temperature district heating). The temperature at the heat plant is 46 °C and around 40 °C at the substations. To avoid the proliferation of Legionella in the DHW (domestic hot water) and assure the comfortable temperature, all substations were installed with supplementary heating devices. Detailed measurements were taken in the substations, including the electricity demand of the supplementary heating devices. To compare the energy and economic performance of the substations, separate models were built based on standard assumptions. The relative heat and electricity delivered for preparing DHW were calculated. The results showed that substations with storage tanks and heat pumps have high relative electricity demand, which leads to higher integrated costs considering both heat and electricity for DHW preparation. The substations with in-line electric heaters have low relative electricity usage because very little heat is lost due to the instantaneous DHW preparation. Accordingly, the substations with in-line electric heaters would have the lowest energy cost for DHW preparation. To achieve optimal design and operation for the ULTDH substation, the electricity peak loads of the in-line electric heaters were analysed according to different DHW-heating strategies. - Highlights: • Five different substations supplied with ultra-low-temperature district heating were measured. • The relative heat and electricity delivered for DHW preparation were modelled for different substations. • The levelized cost of the five substations in respect of DHW preparation was calculated. • The feasibility of applying instantaneous electric heater with normal power supply was tested.

  1. 7 CFR 1794.6 - Definitions.

    Science.gov (United States)

    2010-01-01

    ... mounted on a pole, on a concrete pad, or in a partial or full enclosure such as a shelter, or small... special consideration. The guide describes the standards or types of protection that apply. Preliminary... electric substations and switching stations. Third party consultant. A party selected by RUS to prepare the...

  2. ANALYSIS OF ENERGY EFFICIENCY OF OPERATING MODES OF ELECTRICAL SYSTEMS WITH THE TRACTION LOADS

    Directory of Open Access Journals (Sweden)

    V. E. Bondarenko

    2017-03-01

    Full Text Available Innovative scenarios of reliable energy supply of transportation process aimed at reducing the specific energy consumption and increase energy efficiency of the systems of electric traction. The paper suggests innovative energy saving directions in traction networks of railways and new circuit solutions accessing traction substations in energy systems networks, ensure energy security of the transportation process. To ensure the energy security of rail transport special schemes were developed to propose the concept of external power traction substations, which would increase the number of connections to the networks of 220 – 330 kV, as well as the creation of transport and energy corridors, development of its own supply of electric networks of 110 kV substations and mobile RP-110 kV of next generation. Therefore, the investment program of the structures owned by the Ukrainian Railways (Ukrzaliznytsia need to be synchronized in their technological characteristics, as well as the criteria of reliability and quality of power supply with the same external energy investment programs. It is found that without any load on left or right supplying arm one of two less loaded phases of traction transformer begins generating specific modes in the supplying three-phase line. Thus, modes of mobile substation cause leakage in one of the phases of the supply line of traction transformers of active-capacitive current, and as a result generating energy in the main power line of 154 kV, which is fixed and calculated by electricity meters. For these three phase mode supply network is necessary to use 1st algorithm, i.e. taking into account the amount of electricity as the energy in all phases. For effective application of reactive power compensation devices in the AC traction power supply systems it is proposed to develop regulatory documentation on necessity of application and the order of choice of parameters and placement of compensation systems taking into

  3. Cost Forecasting of Substation Projects Based on Cuckoo Search Algorithm and Support Vector Machines

    Directory of Open Access Journals (Sweden)

    Dongxiao Niu

    2018-01-01

    Full Text Available Accurate prediction of substation project cost is helpful to improve the investment management and sustainability. It is also directly related to the economy of substation project. Ensemble Empirical Mode Decomposition (EEMD can decompose variables with non-stationary sequence signals into significant regularity and periodicity, which is helpful in improving the accuracy of prediction model. Adding the Gauss perturbation to the traditional Cuckoo Search (CS algorithm can improve the searching vigor and precision of CS algorithm. Thus, the parameters and kernel functions of Support Vector Machines (SVM model are optimized. By comparing the prediction results with other models, this model has higher prediction accuracy.

  4. Recruiting, Training, Retaining, and Promoting the Workforce of the Future at Comanche Peak Steam Electric Station

    International Nuclear Information System (INIS)

    Sunseri, M.

    1999-01-01

    TXU Electric expects to encounter a relatively high turnover in the workforce in the coming years. To prepare for this challenge and to maintain a high level of performance, a number of approaches are being implemented. These approaches involve recruiting experienced personnel, recruiting and developing local nonexperienced personnel, and developing current employees. Through these approaches, TXU Electric expects to maintain a high-quality workforce for the continued support of Comanche Peak Steam Electric Station

  5. Design of electric vehicle charging station based on wind and solar complementary power supply

    Science.gov (United States)

    Wang, Li

    2018-05-01

    Electric vehicles have become a major trend in the development of the automobile industry. Green energy saving is an important feature of their development. At the same time, the related charging facilities construction is also critical. If we improve the charging measures to adapt to its green energy-saving features, it will be to a greater extent to promote its further development. This article will propose a highly efficient green energy-saving charging station designed for the electric vehicles.

  6. Provision of Flexible Load Control by Multi-Flywheel-Energy-Storage System in Electrical Vehicle Charging Stations

    DEFF Research Database (Denmark)

    Sun, Bo; Dragicevic, Tomislav; Andrade, Fabio

    2015-01-01

    in order to support basic electrical operation. This paper proposes a local implementation of a hysteresis-based aggregation algorithm for coordinated control of multiple stations that can provide functions such as peak shaving, spinning reserves, frequency control, regulation and load following. Local......Electrical vehicle (EV) chargers are going to occupy a considerable portion of total energy consumption in the future smart grid. Fast charging stations (FCS), as the most demanding representatives of charging infrastructure, will be requested to provide some ancillary services to the power system...... stability. Finally, corresponding hardware in the loop results based on dSPACE1006 platform have been reported in order to verify the validity of proposed approach....

  7. Ingledow 500 kV substation : using mixed technology switchgear solutions for replacement

    Energy Technology Data Exchange (ETDEWEB)

    Wallner, C.; Glaubitz, P. [Siemens AG, Munich (Germany); Messinger, T. [British Columbia Transmission Corp., Vancouver, BC (Canada)

    2008-07-01

    The reliability of the 500 kV equipment at the Ingledow substation operated by BC Hydro Transmission System is of critical importance due to the energy interchange with the Bonneville Power Authority in the United States and the major role of the substation in serving the energy needs of British Columbia's densely populated Lower Mainland. Presently, the 500 kV switchyard includes 10 airblast circuit breakers and the associated current transformers which are all approaching their end of service-life. In response to environmental and safety concerns, the British Columbia Transmission Corporation adopted a policy whereby new oil-filled transformers are no longer acceptable, and the replacement of existing oil-filled transformers must be oil-free. The result is that the current transformers must be either bushing-type or sulphur-hexafluoride (SF6) type. The replacement strategies for the substation equipment consider economical, environmental and seismic issues. They have just as strong an influence on the decision process as the technical, operational and reliability aspects for the particular case or switchgear replacement in the transmission system. The Ingledow case demonstrates the advantages of using mixed technology switchgear, with its compact design flowing from gas insulated switchgear (GIS) for replacement of equipment in an outdoor switchyard. The advantages of the MTS in this case offer the possibility of future reconfiguration to improve the system reliability within the existing switchyard space. 3 refs., 5 figs.

  8. Papers of 4. Scientific-Technical Seminar: Material Study for Electric Power Stations and Energetics

    International Nuclear Information System (INIS)

    1997-01-01

    The research on the materials commonly used in electric power stations and energetics have been summarized in the course of the seminar. Especially a different kinds of steels have been investigated from the view point of their desirable mechanical and corrosion properties

  9. Type test of Class 1E electric cables, field splices, and connections for nuclear power generating stations - 1975

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    This Standard provides direction for establishing type tests which may be used in qualifying Class 1E electric cables, field splices, and other connections for service in nuclear power generating stations. General guidelines for qualifications are given in IEEE Std 323-1974, Standard for Qualifying Class 1E Electric Equipment for Nuclear Power Generating Stations. Categories of cables covered are those used for power control and instrumentation services. Though intended primarily to pertain to cable for field installation, this guide may also be used for the qualification of internal wiring of manufactured devices

  10. Numerical modelling and experimental measurements for a low-temperature district heating substation for instantaneous preparation of DHW with respect to service pipes

    International Nuclear Information System (INIS)

    Brand, Marek; Thorsen, Jan Eric; Svendsen, Svend

    2012-01-01

    Traditional district heating (DH) systems are becoming uneconomic as the number of new and renovated buildings with reduced heating requirements increases. To keep DH competitive in the future, heat losses in DH networks need to be reduced. One option is to reduce the supply temperature of DH as much as possible. This requires a review and improvement of a DH network, in-house substations, and the whole domestic hot water (DHW) supply system, with the focus on user comfort, hygiene, overall cost and energy efficiency. This paper describes some practical approaches to the implementation of low-temperature district heating (LTDH) with an entry-to-substation temperature around 50 °C. To this end we developed a numerical model for an instantaneous LTDH substation that takes into consideration the effect of service pipes. The model has been verified and can be used for the further optimization of the whole concept as well for individual components. The results show that the way that the service pipe is operated has a significant effect on waiting time for DHW, heat loss, and overall cost. Furthermore, the service pipe should be kept warm by using a bypass in order to fulfil the comfort requirements for DHW instantaneously prepared. -- Highlights: ► Describes and justifies concept of low-temperature district heating with supply temperature of 50 °C. ► Focuses on DHW preparation in low-temperature district heating in-house substations, considering comfort and Legionella. ► Verified numerical model reports on dynamic performance of an in-house substation, considering operation of service pipes. ► Bypass is needed for instantaneous type of district heating substations to fulfil comfort requirements of users. ► The model developed can be used for future optimization of low-temperature substations and whole district heating networks.

  11. Electric utilities deregulation and its impact on nuclear power generating stations

    International Nuclear Information System (INIS)

    Trehan, N.K.

    1998-01-01

    Under restructuring and deregulation, it is not clear as to who would have the responsibility, and what obligations the market participants would have to ensure that the electrical system reliability (stability) is maintained. Due to the dynamic nature of the electrical grid, especially with the implementation of restructuring and deregulation, vulnerabilities exist which may impact the reliability (stability) of the offsite electrical power system. In a nuclear power generating unit, an offsite electric power system and an onsite electric power system are required to permit the functioning of structures, systems, and components which are important to safety. The safety function for each system is to provide sufficient capacity and capability to assure that the containment integrity is maintained during power operation or in the event of a postulated accident. Analyses performed by the applicants must verify that the electrical grid remains stable in the event of a loss of the nuclear unit generator, the largest other unit on the grid or the most critical transmission line. The stability of the electric grid is assumed in the safety analyses and a change in it would impact those analyses. However, it may impact the availability of a stable electric power to the safety buses because of the limited number of available transmission lines. This paper discusses electrical power generation and demand, reserve margins, power transfer capability, development of new innovative technologies to compensate for lack of the construction of transmission lines, legislation for the formulation of a self regulation organization (SRO), grid disturbances that may lead to a voltage collapse, and the vulnerabilities which may impact the availability of a stable power to the nuclear power generating stations

  12. Development of Protection and Control Unit for Distribution Substation

    Science.gov (United States)

    Iguchi, Fumiaki; Hayashi, Hideyuki; Takeuchi, Motohiro; Kido, Mitsuyasu; Kobayashi, Takashi; Yanaoka, Atsushi

    The Recently, electronics and IT technologies have been rapidly innovated and have been introduced to power system protection & control system to achieve high reliability, maintainability and more functionality. Concerning the distribution substation application, digital relays have been applied for more than 10 years. Because of a number of electronic devices used for it, product cost becomes higher. Also, products installed during the past high-growth period will be at the end of lifetime and will be replaced. Therefore, replacing market is expected to grow and the reduction of cost is demanded. Considering above mentioned background, second generation digital protection and control unit as a successor is designed to have following concepts. Functional integration based on advanced digital technologies, Ethernet LAN based indoor communication network, cost reduction and downsizing. Pondering above concepts, integration of protection and control function is adopted in contrary to the functional segregation applied to the previous system in order to achieve one-unit concept. Also the adoption of Ethernet LAN for inter-unit communication is objective. This report shows the development of second-generation digital relay for distribution substation, which is equipped with control function and Ethernet LAN by reducing the size of auxiliary transformer unit and the same size as previous product is realized.

  13. On issue of reconstruction at central distribution substation by example of one of plants of Chelyabinsk region

    Science.gov (United States)

    Brylina, O. G.; Semenova, K. D.; Shashkin, V. YU

    2018-03-01

    The article considers the issues of increasing the reliability and economy of the distribution substation. The result is found due to the reconstruction of the central distribution substation and one of the plants of Chelyabinsk region. The reasons for the reconstruction are explained. A comparison of oil and vacuum circuit breakers is made. The advantages of vacuum circuit breakers are shown. Alternative replacement of cables is offered. The basic technical characteristics of the cable brands are shown. The results of reconstruction are proved.

  14. New conceptual design for offshore wind power substations

    International Nuclear Information System (INIS)

    2016-01-01

    The presentation of the new offshore wind power substation project, Marin-el, took place last December at an event held at the Higher School of Naval Engineering (ETSIN), part of the Universidad Politécnica de Madrid (UPM). The project is headed up by Iberdrola and backed by the Government of the Basque Country with a project consortium featuring the participation of the Tecnalia technological centre and the Construcciones Navales del Norte (La Naval) shipyard among other firms from the naval and renewable energies sectors. (Author)

  15. Population Stabilization in India: A Sub-State level Analysis

    OpenAIRE

    Purohit C, Dr Brijesh

    2007-01-01

    The study aims at analyzing economic and policy factors impinging upon population stabilization measures at the district (sub-state level) in India. It reflects upon popularly debated notions, namely, that development is the best contraceptive or whether contraceptive is the best development. In order to reflect upon this notion, we hypothesize that the factors determining the success of population stabilization measures are likely to be different across rich and poor states. It is more likel...

  16. Infrastructure for Integration of Legacy Electrical Equipment into a Smart-Grid Using Wireless Sensor Networks.

    Science.gov (United States)

    de Araújo, Paulo Régis C; Filho, Raimir Holanda; Rodrigues, Joel J P C; Oliveira, João P C M; Braga, Stephanie A

    2018-04-24

    At present, the standardisation of electrical equipment communications is on the rise. In particular, manufacturers are releasing equipment for the smart grid endowed with communication protocols such as DNP3, IEC 61850, and MODBUS. However, there are legacy equipment operating in the electricity distribution network that cannot communicate using any of these protocols. Thus, we propose an infrastructure to allow the integration of legacy electrical equipment to smart grids by using wireless sensor networks (WSNs). In this infrastructure, each legacy electrical device is connected to a sensor node, and the sink node runs a middleware that enables the integration of this device into a smart grid based on suitable communication protocols. This middleware performs tasks such as the translation of messages between the power substation control centre (PSCC) and electrical equipment in the smart grid. Moreover, the infrastructure satisfies certain requirements for communication between the electrical equipment and the PSCC, such as enhanced security, short response time, and automatic configuration. The paper’s contributions include a solution that enables electrical companies to integrate their legacy equipment into smart-grid networks relying on any of the above mentioned communication protocols. This integration will reduce the costs related to the modernisation of power substations.

  17. Infrastructure for Integration of Legacy Electrical Equipment into a Smart-Grid Using Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Paulo Régis C. de Araújo

    2018-04-01

    Full Text Available At present, the standardisation of electrical equipment communications is on the rise. In particular, manufacturers are releasing equipment for the smart grid endowed with communication protocols such as DNP3, IEC 61850, and MODBUS. However, there are legacy equipment operating in the electricity distribution network that cannot communicate using any of these protocols. Thus, we propose an infrastructure to allow the integration of legacy electrical equipment to smart grids by using wireless sensor networks (WSNs. In this infrastructure, each legacy electrical device is connected to a sensor node, and the sink node runs a middleware that enables the integration of this device into a smart grid based on suitable communication protocols. This middleware performs tasks such as the translation of messages between the power substation control centre (PSCC and electrical equipment in the smart grid. Moreover, the infrastructure satisfies certain requirements for communication between the electrical equipment and the PSCC, such as enhanced security, short response time, and automatic configuration. The paper’s contributions include a solution that enables electrical companies to integrate their legacy equipment into smart-grid networks relying on any of the above mentioned communication protocols. This integration will reduce the costs related to the modernisation of power substations.

  18. The thermal relay design to improve power system security for the HTS cables in Icheon substation

    International Nuclear Information System (INIS)

    Lee, Hansang; Yang, Byeong-Mo; Jang, Gilsoo

    2013-01-01

    Highlights: •It is important to study thermal characteristics of the HTS cable. •The thermal relay in the Icheon substation has been developed. •Well-designed thermal relay has been verified through PSCAD/EMTDC simulations. -- Abstract: This paper proposes a model for thermal protection relay for the high temperature superconducting (HTS) cables and thermal protection scheme in Icheon substation in Korea. The thermal protection is one of the most important factors to guarantee the reliability of the HTS cable as well as power system security. The superconductivity of the HTS cables, which can be guaranteed by the liquid nitrogen near 70 K, can be threatened by the large fault current. To avoid the overheating in HTS cable and to secure the power system operation with the HTS cable, the thermal protection relay should be considered. To find the optimal thermal-protection scheme, the model for the superconducting power system has been achieved in Icheon substation and the thermal protection scheme has been verified through PSCAD/EMTDC simulation

  19. The thermal relay design to improve power system security for the HTS cables in Icheon substation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hansang, E-mail: hslee80@kiu.ac.kr [School of Railway and Electrical Engineering, Kyungil University, Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do 712-701 (Korea, Republic of); Yang, Byeong-Mo [Korea Electric Power Research Institute, Munji-dong, Yuseong-gu, Daejeon 305-760 (Korea, Republic of); Jang, Gilsoo, E-mail: gjang@korea.ac.kr [School of Electrical Engineering, Korea University, Anam-dong 5-ga, Seongbuk-gu, Seoul 136-713 (Korea, Republic of)

    2013-11-15

    Highlights: •It is important to study thermal characteristics of the HTS cable. •The thermal relay in the Icheon substation has been developed. •Well-designed thermal relay has been verified through PSCAD/EMTDC simulations. -- Abstract: This paper proposes a model for thermal protection relay for the high temperature superconducting (HTS) cables and thermal protection scheme in Icheon substation in Korea. The thermal protection is one of the most important factors to guarantee the reliability of the HTS cable as well as power system security. The superconductivity of the HTS cables, which can be guaranteed by the liquid nitrogen near 70 K, can be threatened by the large fault current. To avoid the overheating in HTS cable and to secure the power system operation with the HTS cable, the thermal protection relay should be considered. To find the optimal thermal-protection scheme, the model for the superconducting power system has been achieved in Icheon substation and the thermal protection scheme has been verified through PSCAD/EMTDC simulation.

  20. National Maglev initiative: California line electric utility power system requirements

    Science.gov (United States)

    Save, Phil

    1994-01-01

    The electrical utility power system requirements were determined for a Maglev line from San Diego to San Francisco and Sacramento with a maximum capacity of 12,000 passengers an hour in each direction at a speed of 300 miles per hour, or one train every 30 seconds in each direction. Basically the Maglev line requires one 50-MVA substation every 12.5 miles. The need for new power lines to serve these substations and their voltage levels are based not only on equipment loading criteria but also on limitations due to voltage flicker and harmonics created by the Maglev system. The resulting power system requirements and their costs depend mostly on the geographical area, urban or suburban with 'strong' power systems, or mountains and rural areas with 'weak' power systems. A reliability evaluation indicated that emergency power sources, such as a 10-MW battery at each substation, were not justified if sufficient redundancy is provided in the design of the substations and the power lines serving them. With a cost of $5.6 M per mile, the power system requirements, including the 12-kV DC cables and the inverters along the Maglev line, were found to be the second largest cost component of the Maglev system, after the cost of the guideway system ($9.1 M per mile), out of a total cost of $23 M per mile.

  1. Reactive Power Support of Electrical Vehicle Charging Station Upgraded with Flywheel Energy Storage System

    DEFF Research Database (Denmark)

    SUN, BO; Dragicevic, Tomislav; Savaghebi, Mehdi

    2015-01-01

    Electrical vehicles (EVs) are presenting increasingly potential to replace the conventional fossil fuel based vehicles due to environmental friendly characteristic. Accordingly, Charging Stations (CS), as an intermediate between grid and large numbers of EVs, are supposed to have more critical...... influence on future smart transportation network. This paper explores an off-board charging station upgraded with flywheel energy storage system that could provide a reactive power support to the grid utility. A supervisory control scheme based on distributed bus signaling is proposed to coordinate...... the operation of each component in the system. As a result, the charging station could supply the reactive power support to the utility grid without compromising the charging algorithm and preserve the battery’s lifetime. Finally, the real-time simulation results based on dSPACE1006 verifies the proposed...

  2. Section 2: Institut de Recherche d'Hydro-Quebec

    International Nuclear Information System (INIS)

    Maruvada, P.S.

    1991-01-01

    The results performed by the Institut de Recherche d'Hydro-Quebec as part of the Canada-wide effort to characterize electric and magnetic field levels in different environments are reported. In addition to developing instrumentation for 24 hour recording of fields, measurements were carried out in domestic, light industrial, and agricultural environments as well as in generating stations, substations and under power transmission and distribution lines. Measurements in eighteen dwellings, ranging from single family houses to apartments, displayed average electric fields of less than 12 V/m, while average magnetic fields ranged between 0.04 and 9 milligauss. Magnetic fields measured in offices, light industrial and agricultural environments also fell in the same range. Highest magnetic fields were measured in generating stations, with levels up to 1,200 mG. Field levels up to 140 mG were measured in high voltage substations, while levels at the fenced boundary were below 6.2 mG. Magnetic fields under power transmission and distribution lines are reasonably symmetric and similar to theoretical profiles. 31 figs., 4 tabs

  3. Alteration in reactor installation (addition of Unit 2) in Shimane Nuclear Power Station, Chugoku Electric Power Co., Inc. (inquiry)

    International Nuclear Information System (INIS)

    1983-01-01

    An inquiry was made by the Ministry of International Trade and Industry to Nuclear Safety Commission on the addition of Unit 2 in Shimane Nuclear Power Station of The Chugoku Electric Power Co., Inc., concerning the technical capability of Chugoku Electric Power Co., Inc., and the plant safety. The NSC requested the Committee on Examination of Reactor Safety to make a deliberation on this subject. Both the technical capability and the safety of Unit 1 were already confirmed by MITI. Unit 2 to be newly added in the Shimane Nuclear Power Station is a BWR power plant with electric output of 820 MW. The examination made by MITI is described: the technical capability of Chugoku Electric Power Co., Inc., the safety of Unit 2 about its siting, reactor proper, reactor cooling system, radioactive waste management, etc. (J.P.N.)

  4. Engineering of electrical systems of nuclear power stations for improved reliability

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Ramanathan, K.; Choudhary, N.N.

    1977-01-01

    Operational problems experienced in electrical systems/equipment of the Tarapur Atomic Power Station (TAPS) and the Rajasthan Atomic Power Station (RAPS) and their solutions are dealt in detail. This experience has led to new design concepts which are being introduced for improved reliability in design of the Madras Atomic Power Project (MAPP) and the Narora Atomic Power Project (NAPP). Saline pollution on switchyard equipments was the major problem of the TAPS due to its coastal location. Saline pollution resulted in flash over of insulators and failure of clamps. The problem was solved by suitable changes in insulators, conductors, transformers, switches and arranging portable live line washing of the switchyard equipment. In MAPP which is also located on coast, an indoor switchyard is built. NAPP is located in a seismic zone, therefore, all equipment is specified for appropriate seismic duty. Various other improvements are described. (M.G.B.)

  5. Space Station Freedom electrical power system hardware commonality with the United States Polar Platform

    Science.gov (United States)

    Rieker, Lorra L.; Haraburda, Francis M.

    1989-01-01

    Information is presented on how the concept of commonality is being implemented with respect to electric power system hardware for the Space Station Freedom and the U.S. Polar Platform. Included is a historical account of the candidate common items which have the potential to serve the same power system functions on both Freedom and the Polar Platform. The Space Station program and objectives are described, focusing on the test and development responsibilities. The program definition and preliminary design phase and the design and development phase are discussed. The goal of this work is to reduce the program cost.

  6. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  7. A literature survey on asset management in electrical power [transmission and distribution] system

    OpenAIRE

    Khuntia, S.R.; Rueda Torres, José L.; Bouwman, S.; van der Meijden, M.A.M.M.

    2016-01-01

    Asset management is one of the key components in a transforming electric power industry. Electric power industry is undergoing significant changes because of technical, socio-economical and environmental developments. Also, because of restructuring and deregulation, the focus has been on transmission and distribution assets that include transmission lines, power transformers, protection devices, substation equipment and support structures. This study aims to provide a detailed exposure to ass...

  8. Electric Vehicle Preparedness - Implementation Approach for Electric Vehicles at Naval Air Station Whidbey Island. Task 4

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Stephen [Idaho National Lab. (INL), Idaho Falls, ID (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-06-01

    Several U.S. Department of Defense base studies have been conducted to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). This study is focused on the Naval Air Station Whidbey Island (NASWI) located in Washington State. Task 1 consisted of a survey of the non-tactical fleet of vehicles at NASWI to begin the review of vehicle mission assignments and types of vehicles in service. In Task 2, daily operational characteristics of vehicles were identified to select vehicles for further monitoring and attachment of data loggers. Task 3 recorded vehicle movements in order to characterize the vehicles’ missions. The results of the data analysis and observations were provided. Individual observations of the selected vehicles provided the basis for recommendations related to PEV adoption, i.e., whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively PEVs) can fulfill the mission requirements. It also provided the basis for recommendations related to placement of PEV charging infrastructure. This report focuses on an implementation plan for the near-term adoption of PEVs into the NASWI fleet.

  9. Sickness absence from 1978 to 1992 of Electricite de France (EDF) workers exposed to ELF-EMF: the substation group

    International Nuclear Information System (INIS)

    Souques, M.; Dab, W.; Lambrozo, J.; Chevalier, A.; Coing, F.

    1996-01-01

    Electromagnetic fields are suspected of many health effects, including cancers, immunity and fertility disorders, congenital malformations, suicides and depression.... Although the results of all studies are contradictory and no biological mechanism has been found, populations are concerned about this matter. This study analyzes the absence from work of some EDF employees who are a priori the most professionally exposed to ELF EMF. Absence from work is taken as an health indicator. Although it is not specific, it can be predictive of serious health problems. The specific context of EDF has made it possible to collect and analyze the medical aspect of absence from work, that is rare in France. We were interested with employees working with high voltage (over 90 kV). Three job categories have been selected: live line workers, substation maintenance workers and substation exploitation workers (called in the company the ATEX). The first group concerned the live linemen and the results were exposed previously. It appeared they had more accidents at work, but this was more related to the job of lineman rather than to the EMF exposure. Nevertheless, substation workers have an exposure less intensive but longer than live linemen. We present here the result about the absenteeism of the substation workers, maintenance and exploitation. (author)

  10. Reliability Indicators of Urban Electric Network Schemes for Supply of Second and Third Category Consumers

    Directory of Open Access Journals (Sweden)

    M. A. Korotkevich

    2012-01-01

    Full Text Available The paper considers two schemes of the urban distributive electric network for supply of the second and third category consumers for whom indicators of reliability have been determined.As for a network scheme of the 2nd category it has been determined that while installing low-oil and vacuum switches at a distributive point the most remote transformer substation has the highest non-availability  factor which is higher of the corresponding non-availability  factor of the nearest transformer substation by 1,21–1,23 fold  accordingly.As for a network scheme of the 3rd category consumers it has been obtained the data that reliability of consumers receiving supply from bus-bars of transformer substations with 0,38 kW voltage changes  significantly (by 1,2–1,9-fold while changing a breakpoint of the network with 10 kW voltage.

  11. Two-Level Control for Fast Electrical Vehicle Charging Stations with Multi Flywheel Energy Storage System

    DEFF Research Database (Denmark)

    SUN, BO; Dragicevic, Tomislav; Vasquez, Juan Carlos

    2015-01-01

    This paper applies a hierarchical control for a fast charging station (FCS) composed of paralleled PWM rectifier and dedicated paralleled multiple flywheel energy storage systems (FESSs), in order to mitigate peak power shock on grid caused by sudden connection of electrical vehicle (EV) chargers...

  12. Effects of the Chernobyl and Fukushima nuclear accidents on atmospheric electricity parameters recorded at Polish observation stations

    Science.gov (United States)

    Kubicki, Marek; Baranski, Piotr; Odzimek, Anna; Michnowski, Stanislaw; Myslek-Laurikainen, Bogna

    2013-04-01

    We analyse the atmospheric electricity parameters, measured at Polish geophysical stations in Swider, Poland, and Hornsund, Spitsbergen, in connection with the radioactive incident in Fukushima, Japan, beginning on 11 March 2011, following the 9.0 earthquake and tsunami. We compare our results with the situation during and after the Chernobyl disaster on April 26, 1986, when the radioactive fallout detected at Swider increased in the last week of April 1986, from 4.111 to 238.7 Bq/m2 and up to 967.0 Bq/m2 in the second week of May 1986 - what was more than 235 times greater than the values measured prior to that accident. Besides the electric field especially the electric conductivity is very sensitive to the radioactive contamination of the air. Thus we postulate that these two measurements should be run at geophysical stations over the world and used as a relatively simple and low-cost tool for continuous monitoring of possible hazard caused by nuclear power plant accidents.

  13. N. E. L. Floating Terminator. Volume 3C(NFT) - Technical appraisal. Consultants' 1983 report

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    A report is given by a team of Consultants on the estimated cost of converting wave energy into electrical energy by a 2 GW array of NEL Floating Terminator Devices and delivering the electricity to a sub-station on the west coast of Skye. A detailed engineering assessment is given. Comparisons with the estimates made by the team developing the concept are presented and discrepancies discussed. The main cost differences are caused by the different assessments of the power conversion efficiency and the electrical transmission costs.

  14. A Digital Power Quality Monitoring Equipment Designed for Digital Substation

    Science.gov (United States)

    Li, Wei; Wang, Xin; Geng, Jiewen

    2018-01-01

    Taking into account both current status and development trend of digital substation, this paper proposed a design of a new multi-channelled digital power quality monitoring equipment with high compatibility. The overall functional structure, hardware architecture, software architecture, interface architecture and some key techniques such as IEC 61850 modelling of transient event and harmonic measurement method under the condition of non-synchronous sampling are described in this paper.

  15. Radioactive waste management at nuclear electric power stations

    International Nuclear Information System (INIS)

    Gordelier, S.C.

    1993-01-01

    After suitable treatment, gaseous and liquid wastes are routinely discharged from Nuclear Electric's stations and are diluted and dispersed in the environment. The discharges are controlled and authorized under UK legislation and the environmental impact is minimal. Most solid wastes were originally accumulated at the site of origin, but since 1978 low level wastes (LLW) have been send to the UK's main disposal site at Drigg. Recent changes at Drigg have resulted in changed arrangements for the transport and disposal of low-level wastes, including volume reduction by supercompaction. Small amounts of intermediate-level waste (ILW) have been conditioned and disposed of in the sea but this route is now effectively closed and there is currently no disposal route for ILW in the UK. Spent ion exchange resins at one power station have been conditioned and are stored pending the availability of a disposal route. Most ILW will continue to be stored in retrievable form on the site of origin until a mobile waste treatment plant can be brought into use. The timing of this will be subject to agreement with the regulators. In the case of Magnox fuel element debris, a demonstration dissolution plant has been constructed and this will significantly reduce the volume of waste being stored while retaining the bulk of the activity on site for later treatment. A further development has been the construction of a new facility which will hold Magnox fuel element debris in 500 liter drums

  16. Technical Specifications, Comanche Peak Steam Electric Station, Unit 1 (Docket No. 50-445)

    International Nuclear Information System (INIS)

    1990-04-01

    The Technical Specifications for Comanche Peak Steam Electric Station, Unit 1 were prepared by the US Nuclear Regulatory Commission. They set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility, as set forth in Section 50.36 of Title 10 of the Code of Federal Regulations Part 50, for the protection of the health and safety of the public

  17. Orientation of Space Station Freedom electrical power system in environmental effects assessment

    Science.gov (United States)

    Lu, Cheng-Yi

    1990-01-01

    The orientation effects of six Space Station Freedom Electrical Power System (EPS) components are evaluated for three environmental interactions: aerodynamic drag, atomic oxygen erosion, and orbital debris impact. Designers can directly apply these orientation factors to estimate the magnitude of the examined environment and the environmental effects for the EPS component of interest. The six EPS components are the solar array, photovoltaic module radiator, integrated equipment assembly, solar dynamic concentrator, solar dynamic radiator, and beta gimbal.

  18. IEEE Std 317-1972: IEEE standard for electric penetration assemblies in containment structures for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard prescribes the mechanical, electrical, and test requirements for the design, construction, and installation of electric penetration assemblies in containment structures for stationary nuclear power generating stations. The electric conductor and insulation characteristics of external circuits which connect to penetration assemblies are beyond the scope of these criteria. If there should be any conflict between this standard and those documents referenced herein, this standard shall take precedence over the referenced documents

  19. Load demand profile for a large charging station of a fleet of all-electric plug-in buses

    Directory of Open Access Journals (Sweden)

    Mario A. Rios

    2014-08-01

    Full Text Available This study proposes a general procedure to compute the load demand profile from a parking lot where a fleet of buses with electric propulsion mechanisms are charged. Such procedure is divided in three different stages, the first one models the daily energy utilisation of the batteries based on Monte Carlo simulations and route characteristics. The second one models the process in the charging station based on discrete event simulation of queues of buses served by a lot of available chargers. The third step computes the final demand profile in the parking lot because of the charging process based on the power consumption of batteries’ chargers and the utilisation of the available charges. The proposed procedure allows the computation of the number of required batteries’ chargers to be installed in a charging station placed at a parking lot in order to satisfy and ensure the operation of the fleet, the computation of the power demand profile and the peak load and the computation of the general characteristics of electrical infrastructure to supply the power to the station.

  20. A Control Algorithm for Electric Vehicle Fast Charging Stations Equipped with Flywheel Energy Storage Systems

    DEFF Research Database (Denmark)

    Sun, Bo; Dragicevic, Tomislav; Freijedo Fernandez, Francisco Daniel

    2016-01-01

    This paper proposes a control strategy for plugin electric vehicle (PEV) fast charging station (FCS) equipped with a flywheel energy storage system (FESS). The main role of the FESS is not to compromise the predefined charging profile of PEV battery during the provision of a hysteresis-type active...

  1. An Auto Tuning Substation Peak Shaving Controller for Congestion Management Using Flexible Demand

    DEFF Research Database (Denmark)

    Sossan, Fabrizio; Marinelli, Mattia

    2013-01-01

    A closed loop substation peak shaving/congestion management controller for radial distribution networks is presented. The controller it uses an individual control signal in order to shift the consumption of a population of demand side resources, DSRs. The controller auto tunes its parameters on...

  2. Local society and nuclear power stations

    International Nuclear Information System (INIS)

    1984-02-01

    This report was made by the expert committee on region investigation, Japan Atomic Industrial Forum Inc., in fiscal years 1981 and 1982 in order to grasp the social economic influence exerted on regions by the location of nuclear power stations and the actual state of the change due to it, and to search for the way the promotion of local community should be. The influence and the effect were measured in the regions around the Fukushima No. 1 Nuclear Power Station of Tokyo Electric Power Co., Inc., the Mihama Power Station of Kansai Electric Power Co., Inc., and the Genkai Nuclear Power Station of Kyushu Electric Power Co., Inc. The fundamental recognition in this discussion, the policy of locating nuclear power stations and the management of regions, the viewpoint and way of thinking in the investigation of the regions where nuclear power stations are located, the actual state of social economic impact due to the location of nuclear power stations, the connected mechanism accompanying the location of nuclear power stations, and the location of nuclear power stations and the acceleration of planning for regional promotion are reported. In order to economically generate electric power, the rationalization in the location of nuclear power stations is necessary, and the concrete concept of building up local community must be decided. (Kako, I.)

  3. 75 FR 43519 - Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No...

    Science.gov (United States)

    2010-07-26

    ... DEPARTMENT OF ENERGY Western Area Power Administration Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No. 5 Substation and the Palo Verde Hub AGENCY... Department of Energy (DOE), is requesting SOIs from entities that are interested in purchasing transmission...

  4. IEEE No. 323, IEEE trial-use standard: General guide for qualifying Class I electric equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This document describes the basic requirements for the qualification of Class I electric equipment. This is equipment which is essential to the safe shutdown and isolation of the reactor or whose failure or damage could result in significant release of radioactive material. The purpose of this document is to provide guidance for demonstrating the qualifications of electrical equipment as required in the IEEE Std 279 -- Criteria for Nuclear Power Generating Station Protection Systems, and IEEE Std 308 -- Criteria for Class 1E Electric Systems for Nuclear Power Generating Stations. The qualification methods described may be used in conjunction with the Guides for qualifying specific types of equipment, (see Foreword), for updating qualification following modifications or for qualifying equipment for which no applicable Guide exists

  5. Feasibility assessment of a solar-powered charging station for electric vehicles in the North Central region of Bulgaria

    Directory of Open Access Journals (Sweden)

    Ilieva Liliya Mihaylova

    2016-01-01

    Full Text Available The paper discusses the topical issue related to the prospects of widespread deployment of electric vehicles and their associated infrastructure in Bulgaria. The main problems hindering the development of electric vehicle transport are summarized and the current status of charging infrastructure in the country is discussed. An approach is proposed for analysis and evaluation of the financial feasibility of investment in a solar-powered charging station for electric vehicles in North Central region of Bulgaria.

  6. Overview on the electric power in june 2003

    International Nuclear Information System (INIS)

    2003-01-01

    This document aims to give information on the exploitation of the transmission public network and the french electric power industry during june 2003: the internal electric power consumption in France (national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses) - national consumption in June 2003 has risen by 1.8% compared with that of June 2002. The June average temperature which has been 2.9 deg. C higher in 2003 than in June 2002 has resulted in consumption linked to higher use of air-conditioning. Adjusted for climatic effects, monthly consumption has increased by 1.3% compared with June 2002. The consumption growth rate adjusted over 12 months has fallen by 0.1% since last month, whereas the national consumption growth rate over the last 12 months has remained stable; the energy accounting from the transmission point of view (the balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network) - in June 2003, consumption has increased compared with June 2002, whereas exports have fallen by 0.3 TWh. The overall volume of injections has risen by 0.2 TWh. This month, hydro generation is down by 0.8 TWh due to inflows being 25% lower than in June 2002, whereas thermal generation is up by 0.3 TWh. Imports are up by around 0.7 TWh; the consumption and the physical exchanges (these values reflect all of the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electric power market: the market players, contractual exchanges recorded by RTE contracts for access to international connections, contractual exchanges by border; and the evolution of the transmission network - the following

  7. A comparison of magnetic fields inside and outside high-voltage urban 110-kV power substations with the exposure recommendations of the Ukrainian regulatory authorities

    International Nuclear Information System (INIS)

    Okun, Oleksandr; Shevchenko, Sergey; Korpinen, Leena

    2013-01-01

    The aim of this study was to carry out theoretical investigations of power frequency magnetic fields (MFs), produced inside and outside the domain of urban 110-kV power substations and to establish a correspondence between the levels of the fields and the specified population limits as defined by Ukrainian regulations. The fields produced by high-voltage substations were studied based on the application of the numerical finite element methodology. The investigations have shown that magnetic flux density values calculated inside and outside the considered 110-kV power substations do not reach the exposure limits specified by the Ukrainian regulations (1750 μT) and by international guidelines (ICNIRP 2010). Inside the domain of the substation, the maximum value of MFs was found under the 10-kV bus-bars and it equalled 420 μT. (authors)

  8. Combined Solar Charging Stations and Energy Storage Units Allocation for Electric Vehicles by Considering Uncertainties

    DEFF Research Database (Denmark)

    Yousefi Khanghah, Babak; Anvari-Moghaddam, Amjad; Guerrero, Josep M.

    2017-01-01

    Electric vehicles (EVs) are becoming a key feature of smart grids. EVs will be embedded in the smart grids as a mobile load-storage with probabilistic behavior. In order to manage EVs as flexible loads, charging stations (CSs) have essential roles. In this paper, a new method for optimal sitting...... are considered based on time-of-use (TOU) demand response programs (DRPs). In order to solve the optimization problem considering uncertainty of load growth, electricity price, initial state of charge of batteries and solar power generation, genetic algorithm method using Monte-Carlo simulation is used...

  9. Price Based Electric Vehicle Charging

    DEFF Research Database (Denmark)

    Mahat, Pukar; Handl, Martin; Kanstrup, Kenneth

    2012-01-01

    It is expected that a lot of the new light vehicles in the future will be electrical vehicles (EV). The storage capacity of these EVs has the potential to complement renewable energy resources and mitigate its intermittency. However, EV charging may have negative impact on the power grid. This pa......It is expected that a lot of the new light vehicles in the future will be electrical vehicles (EV). The storage capacity of these EVs has the potential to complement renewable energy resources and mitigate its intermittency. However, EV charging may have negative impact on the power grid...... method where distribution system operator (DSO) optimizes the cost of EV charging while taking substation transformer capacity into account....

  10. Electrical energy in France in 2009

    International Nuclear Information System (INIS)

    2009-12-01

    The figures presented on this document account for the electricity flows recorded in Metropolitan France, including Corsica. Contents: national consumption; physical exchanges with foreign countries; electrical energy balance in France in 2009; net generation; noteworthy data for the year 2009 (daily maximum values of national consumption, thermal generation, hydro-electric generation, wind generation and balance of physical exchanges); electricity market: cross-borders contractual exchanges, balance responsible entities (Energy amount exchanged between balance responsible entities through the block exchange notifications), balancing mechanism (global amount of energy activated upwards and downwards), daily market coupling; power facilities: generating facilities in France (Nuclear, Fossil fuel thermal, Hydro-electric, Wind and Other renewable energy sources), transmission lines owned by RTE (circuit length in operation), transmission - transformers owned by RTE (installed capacity in operation); main transmission facilities commissioned during the year 2009 (substations connected to the RTE network and new or refurbished circuits)

  11. Long-term exposure to electrical fields: a cross-sectional epidemiologic investigation of occupationally exposed workers in high-voltage substations

    Energy Technology Data Exchange (ETDEWEB)

    Knave, B

    1979-07-01

    The aim of the study was to investigate the possibility of persistent, chronic health effects in the exposed group as a consequence of exposure. The investigation included the nervous sytem, cardiovascular system and the blood. Fertility was also assessed. The results showed no differences between the exposed and reference groups as a consequence of the long-term exposure. The groups differed, however, in that the exposed group had (a) consistently better results on the psychological performance tests, (b) fewer children, especially boys, and (c) somewhat higher education. The differences in test results were due to the higher education among the exposed. The difference in number of children was also thought to be related to factors other than exposure since the difference in number of children was found to be present already 10 to 15 years before the work in 400 kV substations began. 35 references.

  12. Electrical energy in France in 2008

    International Nuclear Information System (INIS)

    2008-12-01

    The figures presented on this document account for the electricity flows recorded in Metropolitan France, including Corsica. Contents: national consumption; physical exchanges with foreign countries; electrical energy balance in France in 2008; net generation; noteworthy data for the year 2008 (daily maximum values of National consumption, Hydroelectric generation and non-Hydroelectric generation, Balance of physical exchanges); electricity market: cross-border contractual exchanges, balance responsible entities (Energy amount exchanged between balance responsible entities through the block exchange notifications), balancing mechanism (Global amount of energy activated upwards and downwards); power facilities: generating facilities in France (Nuclear, Fossil fuel thermal, Hydro-electric, Wind and Other renewable energy sources), transmission lines (circuit length in operation), transmission - transformers (installed capacity in operation); main transmission facilities commissioned during the year 2008 (substations connected to the RTE network and new or refurbished circuits)

  13. Long-term security of electrical and control engineering equipment in nuclear power stations to withstand a loss of coolant accident

    International Nuclear Information System (INIS)

    Mueller, H.

    1996-01-01

    Electrical and control engineering equipment, which has to function even after many years of operation in the event of a fault in a saturated steam atmosphere of 160 C maximum, is essential in nuclear power stations in order to control a loss of coolant accident. The nuclear power station operators have, for this purpose, developed verification strategies for groups of components, by means of which it is ensured that the electrical and control engineering components are capable of dealing with a loss of coolant accident even at the end of their planned operating life. (orig.) [de

  14. Investigation on the Factors Affecting the Temperature in Urban Distribution Substations and an Energy-Saving Cooling Strategy

    Directory of Open Access Journals (Sweden)

    Fan Yang

    2011-02-01

    Full Text Available The different locations of the equipment in urban distribution substations (DSSs and the location of inlet holes and outlet holes usually result in different ventilation effect, which means the power consumed by any ventilating devices present is different. In this paper the temperature field distribution in an urban distribution substation with different locations of the equipment in the substation was calculated first, then factors influencing the temperature field distribution were investigated, and the influence of the different factors was analyzed. When the distance between the apparatus and walls exceeds 3 m, the change of the temperature in the DSS is very small. Therefore considering the floor area of the DSS, 3 m is the best value of the distance between the apparatus. With the change of the environment temperature or the velocity of the ventilation fans, the maximum temperature in the DSS or apparatus will change. Hence an energy saving ventilation strategy is proposed in the paper, and an intelligent cooling control system is developed, which can modify the velocity of the ventilation fans according to the environment temperature, and thus realize energy savings.

  15. Guide to Federal Funding, Financing, and Technical Assistance for Plug-in Electric Vehicles and Charging Stations

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-07-29

    The U.S. Department of Energy and the U.S. Department of Transportation have published a guide to highlight examples of federal support and technical assistance for plug-in electric vehicles (PEVs) and charging stations. The guide provides a description of each opportunity and a point of contact to assist those interested in advancing PEV technology. The Department of Energy’s Alternative Fuels Data Center provides a comprehensive database of federal and state programs that support plug-in electric vehicles and infrastructure.

  16. Evolution of metering and control equipment in district heating house substations. Smaller, smarter and unchangingly robust; Mess- und Regelungstechnik fuer Fernwaermehausstationen im Wandel der Zeit. Kleiner, intelligenter, unveraendert robust

    Energy Technology Data Exchange (ETDEWEB)

    Hesse, Wolfgang; Hilbig, Thomas [Samson AG, Frankfurt am Main (Germany)

    2011-07-15

    The technical evolution of house substations in hot water networks reflects the trend towards greater efficiency. Changes are to be seen above all in the requirements placed on the measurement and control technology used in the energy management functions of the electronic district heating controller as well as on safety equipment. Here DDC (Direct Digital Control) technology has created possibilities for optimising energy consumption. The authors relate the evolution of drinking water heating, self-operated regulators, electrical actuators and of electronic district heating controllers.

  17. Nationwide impact and vehicle to grid application of electric vehicles mobility using an activity based model

    OpenAIRE

    Álvaro, Roberto; González, Jairo; Fraile Ardanuy, José Jesús; Knapen, Luk; Janssens, Davy

    2013-01-01

    This paper describes the impact of electric mobility on the transmission grid in Flanders region (Belgium), using a micro-simulation activity based models. These models are used to provide temporal and spatial estimation of energy and power demanded by electric vehicles (EVs) in different mobility zones. The increment in the load demand due to electric mobility is added to the background load demand in these mobility areas and the effects over the transmission substations are analyzed. From t...

  18. Overall Optimization for Offshore Wind Farm Electrical System

    DEFF Research Database (Denmark)

    Hou, Peng; Hu, Weihao; Chen, Cong

    2017-01-01

    Based on particle swarm optimization (PSO), an optimization platform for offshore wind farm electrical system (OWFES) is proposed in this paper, where the main components of an offshore wind farm and key technical constraints are considered as input parameters. The offshore wind farm electrical...... system is optimized in accordance with initial investment by considering three aspects: the number and siting of offshore substations (OS), the cable connection layout of both collection system (CS) and transmission system (TS) as well as the selection of electrical components in terms of voltage level...... that save 3.01% total cost compared with the industrial layout, and can be a useful tool for OWFES design and evaluation....

  19. Vickers Terminator. Volume 3C(VT) - Technical appraisal. Consultants' 1983 report

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    A report is given by a team of consultants on the estimated cost of converting wave energy to electrical energy by a 2 GW array of Vickers Terminator wave energy devices and delivering the electricity to a sub-station on the west coast of Skye. Comparisons with the estimates made by the team developing the concept are presented and are largely in agreement, except for the capital cost per device and the power chain efficiency. A detailed engineering assessment is given.

  20. Solar electricity power station building. A preliminary project investigation for “PIRIN TEX LTD.” – Gotze Delchgev using

    International Nuclear Information System (INIS)

    Kolev, Boyko; Todorieva, Vanja

    2009-01-01

    The total solar energy absorbed by Earth's atmosphere, oceans and land masses is approximately 3,850,000 exa joules (EJ=1018 J) per year. In 2005, this was more energy in one hour than the world used in one year. Photosynthesis captures approximately 3,000 EJ per year in biomass. The amount of solar energy reaching the surface of the planet is so vast that in one year it is about twice as much as will ever be obtained from all of the Earth's non-renewable resources of coal, oil, natural gas, and mined uranium combined. Natural gas crisis such as this from January 2009 in Bulgaria turn into the best investments the development of technology for renewable energy sources using especially solar energy using for electricity production and water heating. The aims of this article are: To develop a preliminary project for solar electricity power station build-ing; To estimate the profits of solar energy used for electricity production and water heating. Keywords: renewable energy sources, solar energy accumulation, solar electricity power station, natural gas crisis

  1. Fast Demand Forecast of Electric Vehicle Charging Stations for Cell Phone Application

    Energy Technology Data Exchange (ETDEWEB)

    Majidpour, Mostafa; Qiu, Charlie; Chung, Ching-Yen; Chu, Peter; Gadh, Rajit; Pota, Hemanshu R.

    2014-07-31

    This paper describes the core cellphone application algorithm which has been implemented for the prediction of energy consumption at Electric Vehicle (EV) Charging Stations at UCLA. For this interactive user application, the total time of accessing database, processing the data and making the prediction, needs to be within a few seconds. We analyze four relatively fast Machine Learning based time series prediction algorithms for our prediction engine: Historical Average, kNearest Neighbor, Weighted k-Nearest Neighbor, and Lazy Learning. The Nearest Neighbor algorithm (k Nearest Neighbor with k=1) shows better performance and is selected to be the prediction algorithm implemented for the cellphone application. Two applications have been designed on top of the prediction algorithm: one predicts the expected available energy at the station and the other one predicts the expected charging finishing time. The total time, including accessing the database, data processing, and prediction is about one second for both applications.

  2. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    International Nuclear Information System (INIS)

    Jidin, Razali; Othman, Bahari

    2013-01-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  3. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    Science.gov (United States)

    Jidin, Razali; Othman, Bahari

    2013-06-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  4. power quality study of the electrical system of the second research reactor of egypt

    International Nuclear Information System (INIS)

    Fathi, H.M.E.

    2007-01-01

    identifying problems in an electrical network which may results in an extensive damage occur is advisable for any power system. monitoring of power quality is necessary for maintaining accurate operation of sensitive equipment, it also ensures that unnecessary for maintaining accurate operation of sensitive equipment, it also ensures that unnecessary energy losses in a power system are kept at a minimum which lead to more profits. with advanced in technology growing of industrial/commercial facilities in many region. power quality problems have been a major concern among engineers; particularly in an industrial environment, where there are many large-scale type of equipment.thus, it would be useful to monitor and analyze the power quality problems.determination of power quality requires the identification of any anomalous behavior on a power system, which adversely affects the normal operation of electrical or electronic equipment. the choice of monitoring equipment in a survey is also important to ascertain a solution to these power quality problems. a power quality survey involves gathering data resources; analyzing the data (with reference to power quality standard); then , if problems exist, recommendation of mitigation techniques. the main objective of the present work is to identify power quality problems in second research reactor of egypt (ETRR-2). electrical power is supplied to the installation via tow incoming feeders from tow different substations (incoming feeder from new Abo-Zabal substation and incoming feeder from old Abo-Zabal substation ) to keep good reliability , each feeder is designed to carry the full load of ETRR-2. the monitoring investigations were performed at the second research reactor of egypt for both feeders at different operation conditions

  5. 76 FR 67670 - Basin Electric Power Cooperative, Inc.: Notice of Intent To Prepare an Environmental Impact...

    Science.gov (United States)

    2011-11-02

    ..., modifications to 4 existing substations, a 345-kV switchyard, maintenance access roads, temporary construction... will address the construction, operation, and maintenance of Basin Electric's proposed Project. The Project includes construction, operation and maintenance of approximately 190 miles of new 345-kV single...

  6. 30 CFR 57.4130 - Surface electric substations and liquid storage facilities.

    Science.gov (United States)

    2010-07-01

    ... LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Prohibitions/precautions/housekeeping § 57.4130 Surface electric...

  7. Simulation Of Substation HV/MV In DIGSILENT Power Factory Software

    International Nuclear Information System (INIS)

    Mladenovski, Ljubisha; Dimova, Iskra; Iliev, Atanas; Fushtikj, Vangel

    2003-01-01

    This paper presents a method for creating a model for substation high voltage/middle voltage (HV/MV) that supplies consumers at middle voltage side and capacitor battery that regulates the voltage at the middle voltage busbar. The results from the analyses are presented and discussed. The models of the transformer and the capacitor battery were made at the University of Rostock, Germany, in DYSIMAC (DYnaniic SImulation of the MACedonian power plants in a new technological and market environment) project. (Author)

  8. Application of unimodal optic fiber to communications among electric substations; Aplicacion de fibra optica unimodal a comunicaciones entre subestaciones electricas

    Energy Technology Data Exchange (ETDEWEB)

    Martinez Pinon, Fernando; Hernandez Juarez, Taide [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1992-07-01

    The utilization of the unimodal fiber optics technology in the electric power systems, represents one of the best communication options because of its multiple advantages, that results in a better coordination of the technical and administrative activities, needed to carry the electric energy from its generation site to the most remote locations. In this document a study, in accordance with the available options for the design of communication systems via unimodal optic fiber, is presented. With this technology, ties of more than 100 kilometers without the need of repeating stations, can be made. [Espanol] La utilizacion de la tecnologia de fibra optica unimodal en los sistemas electricos de potencia representa una de las mejores alternativas de comunicacion por sus multiples ventajas que se traducen en una mejor coordinacion de las acitividades tecnicas y administrativas necesarias para llevar la energia electrica desde el lugar de generacion hasta los puntos mas distantes. En este documento se presenta un estudio de acuerdo a las opciones disponibles para el diseno de sistemas de comunicacion por fibra optica unimodal. Con esta tecnologia se pueden realizar enlaces mayores que 100 km sin necesidad de repetidores.

  9. Levels of electric field strength within the immediate vicinity of FM radio stations in Accra, Ghana.

    Science.gov (United States)

    Azah, C K; Amoako, J K; Fletcher, J J

    2013-10-01

    Heightened awareness of the ever-expanding use of radiofrequency (RF) techniques and technology has led to mounting concerns from the general public and the scientific community regarding the possible health effects that may arise as a consequence of exposure to RF radiations and has drawn the attention of many researchers the world over. A survey of the RF electromagnetic radiation at public access points in the vicinity of 20 frequency-modulated (FM) radio stations has been made in Accra, Ghana. The fundamental object was to determine the levels of RF fields from FM broadcast antennae within 10-200 m radius about the foot of the FM base station and at a height of 1.5 m above the ground at selected locations. A spectrum analyser and a bi-conical antenna element sensitive and effective within the frequency band of 30-300 MHz were used. Results obtained indicated that the levels of electric field strength ranged from 5.4E-04 V m(-1) at FM station 'O' to 7.4E-08 V m(-1) at FM station 'D'. At a transmission frequency range of 88-108 MHz, the variation of power densities is from 2.5E-10 to 1.5E-17 Wm(-2). These values are very low and are far below the reference level set by the International Commission on Non-Ionizing Radiation Protection and therefore do not pose any known hazard to the inhabitants of Accra, Ghana. The electric field levels presented in this work are comparable with those reported from epidemiological studies conducted elsewhere.

  10. Setting up charging electric stations within residential communities in current China: Gaming of government agencies and property management companies

    International Nuclear Information System (INIS)

    Wu, Tian; Ma, Lin; Mao, Zhonggen; Ou, Xunmin

    2015-01-01

    The difficulty of charging electric vehicles (EVs) is now hindering their further development. Governments generally choose to build stations for home charging (including piles) within residential communities. Given the conflict of interest between various government agencies and property management companies, constructing a charging station within residential communities would result in welfare loss for the property management companies and therefore lead to the principal–agent problem. This paper constructs a two-period imperfect information game theory model to study the moral hazard involved in this issue and government agencies' optimal choice. In the analytic solution of the model, we find that the optimal choice for a farsighted government agency is to constantly improve the incentive mechanism and introduce charging stations only when the conflict of interest is eliminated. Any benefits derived from government regulations by force would prove short-lived. The government should focus on long-term returns in the development of EVs, and its optimal mechanism should be designed to mitigate the principal–agent problem of property management companies, thereby accelerate the progress of EV charging infrastructure and improve overall social welfare. - Highlights: • The charging of electric vehicles (EVs) is hindering their use. • A game theory model is used for analysis of EV charging station construction. • Charging stations are in residential communities in China. • Government agencies are constantly improving incentive mechanisms

  11. The Trencin water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Trencin water power station. The Trencin water power station was built seven years after the Dubnica nad Vahom water power station started its operation and was the last stage of the first and the oldest derived cascade of water power stations on the Vah River. After completing water power stations at Ladce (1936), Ilava (1946) and Dubnica nad Vahom (1949) and before constructing the Trencin water power station, the whole second derived cascade of water power stations including water power stations at Kostolna, Nove Mesto nad Vahom and Horna Streda was built as soon as possible mainly because the need to get compensation for discontinued electricity supplies as well as energetic coal from the Czech Republic. Hereby, experiences from the construction of previous grades were used, mainly as far as the dimensioning was concerned, as the fi rst installed power stations had, in comparison with the growing requirements on the electricity supplies, very low absorption capacity - only 150 m 3 .s -1 . Thus the Trencin power station (original name was the Skalka power station) was already dimensioned for the same absorption capacity as the cascade located downstream the river, that is 180 m 3 .s -1 . That was related also to growing demands on electricity supplies during the peaks in the daily electric system load diagram, and thus to the transfer from continuous operation of the water power station to semi-peak or even peak performance. According to the standards of power station classification, the Trencin water power station is a medium size, low pressure, channel power station with two units equipped by Kaplan turbines and synchronous hydro-alternators. The water power station installed capacity is 16.1 MW in total and its designed annual production of electrical energy for medium water year is 85,000 MWh, while the average annual production during the last 30 years is 86,252 MWh. Installed unit has a four-blade Kaplan turbine with the diameter

  12. Vickers Attenuator. Volume 3C(VA) - Technical appraisal. Consultants' 1983 report

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    A report is given by a team of Consultants on the estimated cost of converting wave energy to electrical energy by a 2 GW array of Vickers Attenuator wave energy devices and delivering this to a sub-station on the west coast of Skye. Comparisons of the estimates made by the team developing the concept are presented and discrepancies discussed. A detailed engineering assessment is given.

  13. The contribution of small hydro power stations to the electricity generation in Greece: Technical and economic considerations

    International Nuclear Information System (INIS)

    Kaldellis, J.K.

    2007-01-01

    Hydropower is the most widely used renewable energy source worldwide, contributing almost with 18.5% to the fulfillment of the planet electricity generation. However, most locations in Europe appropriate for the installation of large hydro power stations have already been exploited. Furthermore, there is a significant local communities' opposition towards new large power stations; hence, small hydro power stations remain one of the most attractive opportunities for further utilization of the available hydro potential. Greece and more precisely the country's mainland possesses a significant hydro-power potential which is up to now only partially exploited. In parallel, a large number of private investors have officially expressed their interest in creating small hydro power stations throughout the country, encouraged by the significant Greek State subsidy opportunities for renewable energy applications. However, up to now a relatively small number of projects have been realized, mainly due to decision-making problems, like the administrative bureaucracy, the absence of a rational national water resources management plan and the over-sizing of the proposed installations. Certainly, if the above problems are suitably treated, small hydro-power plants can be proved considerably profitable investments, contributing also remarkably to the national electricity balance and replacing heavy polluting lignite and imported oil. In the context of the above interesting issues, the present study reviews in detail the existing situation of small hydropower plants in Greece and investigates their future prospects as far as the energy, economic and environmental contribution are concerned

  14. Transient Processes in Electric Power Supply System for Oil Terminal with Own Gas-Turbine Power Station

    Directory of Open Access Journals (Sweden)

    A. M. Hаshimov

    2009-01-01

    Full Text Available The paper contains results of the investigations concerning influence of symmetrical and non-symmetrical short circuits at main power network on electric power supply system of a huge oil terminal which is powered by own gas-turbine power station. Calculations have been made in accordance with the IEC and IEEЕ requirements. Estimations for voltage level and distribution of short circuit current in the electric power supply system of the Sangachal oil terminal being operated in parallel with the AzerEnerji grid are presented in the paper

  15. The expected environmental consequences and hazards of laser-fusion electric generating stations

    International Nuclear Information System (INIS)

    Devaney, J.J.; Pendergrass, J.H.

    The operation of an expected early form of a laser-fusion electric power plant is described and the hazards and the environmental effects of such a station are estimated. Possible environmental impacts and hazards to mankind can occur from nuclear excursions or explosions, nuclear weapon proliferation, loss of coolant accident (LOCA), tritium releases, chemical fires and accompanying releases of radioactivity or chemicals, induced radioactivity releases (other than tritium), radioactive waste disposal, lasers, normal electrical generation and steam plant effects, external intrusions, natural disasters, land use, resource and transportation use, thermal pollution, and air and water pollution. We find the principle environmental effects to be those of a medium size chemical plant. Electric, magnetic, steam, and radioactive hazards are of a lower order. Indeed in the event of extraordinary success in getting high temperatures and densities so that more difficult nuclear species can be reacted, such as protons with boron-11, there will be no radioactivity at all and also enormously lower hazardous chemical inventories. In our plant designs, for any fusion fuels, nuclear explosions (or even excursions beyond design limits) are not possible. (author)

  16. Sources of the wind power stations

    International Nuclear Information System (INIS)

    Chudivani, J.; Huettner, L.

    2012-01-01

    The paper deals with problems of the wind power stations. Describes the basic properties of wind energy. Shows and describes the different types of electrical machines used as a source of electricity in the wind power stations. Shows magnetic fields synchronous generator with salient poles and permanent magnets in the program FEMM. Describes methods for assessing of reversing the effects of the wind power stations on the distribution network. (Authors)

  17. DC Cable for Railway

    Science.gov (United States)

    Tomita, Masaru

    The development of a superconducting cable for railways has commenced, assuming that a DC transmission cable will be used for electric trains. The cable has been fabricated based on the results of current testing of a superconducting wire, and various evaluation tests have been performed to determine the characteristics of the cable. A superconducting transmission cable having zero electrical resistance and suitable for railway use is expected to enhance regeneration efficiency, reduce power losses, achieve load leveling and integration of sub-stations, and reduce rail potential.

  18. Solid waste processing experience at Susquehanna Steam Electric Station

    International Nuclear Information System (INIS)

    Phillips, J.W.; Granus, M.W.

    1984-01-01

    This paper reviews the first year's operation at the Susquehanna Steam Electric Station (SSES) with respect to the Westinghouse Hittman Nuclear Incorporated (Hittman) mobile solidification system and the dry activated waste generation, handling and processing. Experiences pertinent to the mobile solidification system are reviewed with emphasis on the integration of the system into the plant, problems associated with unexpected waste properties and the myriad of operating procedures that had to be prepared. The processing history for 1983 is reviewed in terms of the volume of waste, including solidified wastes, dewatered wastes an DAW. Factors that must be considered in evaluating processing alternatives, i.e., dewatering vs. solidification; steel liners vs. HICs, are discussed. Actions taken by Hittman and SSES to maximize the processing economics are also discussed. Finally, recommendations are provided to the utility considering implementing mobile solification services to ensure a smooth and timely integration of services into the plant

  19. Reliability measurement for mixed mode failures of 33/11 kilovolt electric power distribution stations.

    Directory of Open Access Journals (Sweden)

    Faris M Alwan

    Full Text Available The reliability of the electrical distribution system is a contemporary research field due to diverse applications of electricity in everyday life and diverse industries. However a few research papers exist in literature. This paper proposes a methodology for assessing the reliability of 33/11 Kilovolt high-power stations based on average time between failures. The objective of this paper is to find the optimal fit for the failure data via time between failures. We determine the parameter estimation for all components of the station. We also estimate the reliability value of each component and the reliability value of the system as a whole. The best fitting distribution for the time between failures is a three parameter Dagum distribution with a scale parameter [Formula: see text] and shape parameters [Formula: see text] and [Formula: see text]. Our analysis reveals that the reliability value decreased by 38.2% in each 30 days. We believe that the current paper is the first to address this issue and its analysis. Thus, the results obtained in this research reflect its originality. We also suggest the practicality of using these results for power systems for both the maintenance of power systems models and preventive maintenance models.

  20. Reserving Charging Decision-Making Model and Route Plan for Electric Vehicles Considering Information of Traffic and Charging Station

    Directory of Open Access Journals (Sweden)

    Haoming Liu

    2018-04-01

    Full Text Available With the advance of battery energy technology, electric vehicles (EV are catching more and more attention. One of the influencing factors of electric vehicles large-scale application is the availability of charging stations and convenience of charging. It is important to investigate how to make reserving charging strategies and ensure electric vehicles are charged with shorter time and lower charging expense whenever charging request is proposed. This paper proposes a reserving charging decision-making model for electric vehicles that move to certain destinations and need charging services in consideration of traffic conditions and available charging resources at the charging stations. Besides, the interactive mechanism is described to show how the reserving charging system works, as well as the rolling records-based credit mechanism where extra charges from EV is considered to hedge default behavior. With the objectives of minimizing driving time and minimizing charging expenses, an optimization model with two objective functions is formulated. Then the optimizations are solved by a K shortest paths algorithm based on a weighted directed graph, where the time and distance factors are respectively treated as weights of corresponding edges of transportation networks. Case studies show the effectiveness and validity of the proposed route plan and reserving charging decision-making model.

  1. Stationary Charging Station Design for Sustainable Urban Rail Systems: A Case Study at Zhuzhou Electric Locomotive Co., China

    Directory of Open Access Journals (Sweden)

    Heng Li

    2015-01-01

    Full Text Available In 2014, more than 43 cities in China were racing to construct their urban rail systems (including metro and light rail systems, recognizing that an urban rail system will be a good solution to the tough problems that they are faced with, including traffic congestion and PM2.5 air pollution. On 22 August 2012, the first electric double-layer capacitor (EDLC energy storage-type rail vehicle in the world was unveiled at Zhuzhou Electric Locomotive Co., China. The EDLC rail system has been considered a promising sustainable urban rail system, which is expected to further improve the energy efficiency and to reduce environmental pollution. The first commercial EDLC tram produced by Zhuzhou Electric Locomotive Co. has been applied at Guangzhou Metro Corp. recently. From the view point of scientific research, the system design and energy management of EDLC rail systems have been extensively studied in the literature, while the stationary charging station design for the EDLC energy storage-type urban rail vehicles has been rarely reported. Thus, the aim of this paper is to report a stationary charging station that has been successfully applied in the EDLC rail system produced by Zhuzhou Electric Locomotive Co., China.

  2. A distributed substation automation model based on the multi-agents technology; Um modelo distribuido de automacao de subestacoes baseado em tecnologia multiagentes

    Energy Technology Data Exchange (ETDEWEB)

    Geus, Klaus de; Milsztajn, Flavio; Kolb, Carlos Jose Johann; Dometerco, Jose Henrique; Souza, Alexandre Mendonca de; Braga, Ciro de Carvalho; Parolin, Emerson Luis; Frisch, Arlenio Carneiro; Fortunato Junior, Luiz Kiss; Erzinger Junior, Augusto; Jonack, Marco Antonio; Guiera, Anderson Juliano Azambuja [Companhia Paranaense de Energia (COPEL), Curitiba, PR (Brazil)]. E-mail: klaus@copel.com; flaviomil@copel.com; kolb@copel.com; dometerc@copel.com; alexandre.mendonca@copel.com; ciro@copel.com; parolin@copel.com; arlenio@copel.com; luiz.kiss@copel.com; aerzinger@copel.com; jonack@copel.com; guiera@copel.com

    2006-10-15

    The main purpose of this paper is to analyse distributed computing technology which can be used in substation automation systems. Based on performance comparative results obtained in laboratory, a specific model for distributed substation automation is proposed considering the current model employed at COPEL - Companhia Paranaense de Energia. The proposed model is based on the multi-agents technology, which has lately received special attention in the development of distributed systems with local intelligence. (author)

  3. Power transmission cable development for the Space Station Freedom electrical power system

    Science.gov (United States)

    Schmitz, Gregory V.; Biess, John J.

    1989-01-01

    Power transmission cable is presently being evaluated under a NASA Lewis Research Center advanced development contract for application in the Space Station Freedom (SSF) electrical power system (EPS). Evaluation testing has been performed by TRW and NASA Lewis Research Center. The results of this development contract are presented. The primary cable design goals are to provide (1) a low characteristic inductance to minimize line voltage drop at 20 kHz, (2) electromagnetic compatibility control of the 20-kHz ac power current, (3) a physical configuration that minimizes ac resistance and (4) release of trapped air for corona-free operation.

  4. Technical evaluation report on the adequacy of station electric-distribution-system voltages for the Millstone Nuclear Power Station, Units 1 and 2. Docket Nos. 50-245, 50-336

    International Nuclear Information System (INIS)

    Selan, J.C.

    1983-01-01

    This report documents the technical evaluation of the adequacy of the station electric-distribution-system voltages for the Millstone Nuclear Power Station, Units 1 and 2. The evaluation is to determine if the onsite distribution system, in conjunction with the offsite power sources, has sufficient capacity to automatically start and operate all Class 1E loads within the equipment voltage ratings under certain conditions established by the Nuclear Regulatory Commission. The analyses submitted demonstrate that adequate voltages will be supplied to the Class 1E equipment under the worst-case conditions analyzed

  5. Overview of electrical energy in October 2003

    International Nuclear Information System (INIS)

    2003-01-01

    ; contractual exchanges recorded by RTE (contracts for access to international connections, contractual exchanges by border (these exchanges include all transactions managed by RTE including historical contracts). Transmission network development (the following facilities were commissioned on the RTE network in October): the 400 kV Chevalet-Gavrelle 1 and 2 lines, after the previous line was modified to a dual circuit; this operation is intended to cover quality and security of supply requirements for the Somme and Pas de Calais departments; the 400 kV Tavel-Tricastin 5 line, (circuit 4 had been commissioned in January 2003); this operation increases the transit capacity between the Languedoc-Roussillon and Provence Alpes Cote d'Azur regions on the one hand, and the Rhone-Alpes region on the other hand; the 225 kV Bollene-Croisiere 2 line; the Tricastin substation has also been connected to the 225 kV Bollene-Chateauneuf du Rhone 2 line, as part of work to restructure the 225 kV network between Tavel and Tricastin in the Rhone valley; a 225 kV step at the Vincennes substation, connected to the 225 kV Charenton-Malassis line; the 90 kV substation at Saint Sylvain d'Anjou, which has been connected to the Corbiere-Belfroy-Beaucouze link to strengthen electricity supply to the North-East of Angers; the 90 kV Carvin-Courrieres-Henin 2 link in the Nord region, to guarantee supply to the substation at Carvin

  6. Evaluations of different domestic hot water preparing methods with ultra-low-temperature district heating

    DEFF Research Database (Denmark)

    Yang, Xiaochen; Li, Hongwei; Svendsen, Svend

    2016-01-01

    of Legionella in the DHW (domestic hot water) and assure the comfortable temperature, all substations were installed with supplementary heating devices. Detailed measurements were taken in the substations, including the electricity demand of the supplementary heating devices. To compare the energy and economic......This study investigated the performances of five different substation configurations in single-family houses supplied with ULTDH (ultra-low-temperature district heating). The temperature at the heat plant is 46 degrees C and around 40 degrees C at the substations. To avoid the proliferation...... performance of the substations, separate models were built based on standard assumptions. The relative heat and electricity delivered for preparing DHW were calculated. The results showed that substations with storage tanks and heat pumps have high relative electricity demand, which leads to higher integrated...

  7. Coordinated Voltage Control Scheme for SEIG-Based Wind Park Utilizing Substation STATCOM and ULTC Transformer

    DEFF Research Database (Denmark)

    S. El Moursi, Mohamed; Bak-Jensen, Birgitte; Abdel-Rahman, Mansour Hassan

    2011-01-01

    and optimal tracking secondary voltage control for wind parks based on self-excited induction generators which comprise STATCOM and under-load tap changer (ULTC) substation transformers. The voltage controllers for the STATCOM and ULTC transformer are coordinated and ensure the voltage support. In steady...

  8. Reducing Carbon Dioxide Emissions from Electricity Sector Using Smart Electric Grid Applications

    Directory of Open Access Journals (Sweden)

    Lamiaa Abdallah

    2013-01-01

    Full Text Available Approximately 40% of global CO2 emissions are emitted from electricity generation through the combustion of fossil fuels to generate heat needed to power steam turbines. Burning these fuels results in the production of carbon dioxide (CO2—the primary heat-trapping, “greenhouse gas” responsible for global warming. Applying smart electric grid technologies can potentially reduce CO2 emissions. Electric grid comprises three major sectors: generation, transmission and distribution grid, and consumption. Smart generation includes the use of renewable energy sources (wind, solar, or hydropower. Smart transmission and distribution relies on optimizing the existing assets of overhead transmission lines, underground cables, transformers, and substations such that minimum generating capacities are required in the future. Smart consumption will depend on the use of more efficient equipment like energy-saving lighting lamps, enabling smart homes and hybrid plug-in electric vehicles technologies. A special interest is given to the Egyptian case study. Main opportunities for Egypt include generating electricity from wind and solar energy sources and its geographical location that makes it a perfect center for interconnecting electrical systems from the Nile basin, North Africa, Gulf, and Europe. Challenges include shortage of investments, absence of political will, aging of transmission and distribution infrastructure, and lack of consumer awareness for power utilization.

  9. Optimal recharging strategy for battery-switch stations for electric vehicles in France

    International Nuclear Information System (INIS)

    Armstrong, M.; El Hajj Moussa, C.; Adnot, J.; Galli, A.; Riviere, P.

    2013-01-01

    Most papers that study the recharging of electric vehicles focus on charging the batteries at home and at the work-place. The alternative is for owners to exchange the battery at a specially equipped battery switch station (BSS). This paper studies strategies for the BSS to buy and sell the electricity through the day-ahead market. We determine what the optimal strategies would have been for a large fleet of EVs in 2010 and 2011, for the V2G and the G2V cases. These give the amount that the BSS should offer to buy or sell each hour of the day. Given the size of the fleet, the quantities of electricity bought and sold will displace the market equilibrium. Using the aggregate offers to buy and the bids to sell on the day-ahead market, we compute what the new prices and volumes transacted would be. While buying electricity for the G2V case incurs a cost, it would have been possible to generate revenue in the V2G case, if the arrivals of the EVs had been evenly spaced during the day. Finally, we compare the total cost of implementing the strategies with the cost of buying the same quantity of electricity from EDF. - Highlights: • Optimal strategies for buying/selling electricity through day-ahead auction market. • Given fleet size power bought and sold would change market price and volume. • New prices computed using aggregate offers to buy/sell power in 2010 and 2011. • Timing of arrival of EVs critical in V2G case. If evenly spaced BSS makes money. • Strategies are very robust even when French and German markets were coupled Nov. 2010

  10. Expert systems in power substation operation and control

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Guilherme Moutinho; Lambert-Torres, Germano; Silva, Alexandre P. Alves da [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1994-12-31

    With digital technology being increasingly adopted in power substations (SE), perspectives are created for integration of supervision, control and protection systems in addition to making its process automation feasible. Once a SE is digitalized, the systems which previously were implemented physically will be able to be implemented by means of computer programs (software), allowing the expansion of its scope of operation. Studies and research performed at the international level have pointed to the utilization of Expert Systems (ES) as a more suitable alternative for representation and solution of the operation and control problems, especially those which do not have an established theory, which are provided with diagnosis characteristics and that associate themselves with fuzzy data and information. (author) 4 refs., 3 figs.

  11. Measurement and Modeling of Personal Exposure to the Electric and Magnetic Fields in the Vicinity of High Voltage Power Lines

    Directory of Open Access Journals (Sweden)

    Wafa Tourab

    2016-06-01

    Conclusion: We project to set own national standards for exposure to electromagnetic fields, in order to achieve a regional database that will be at the disposal of partners concerned to ensure safety of people and mainly workers inside high voltage electrical substations.

  12. Lancaster Flexible Bag. Volume 3B - Technical appraisal. Consultants' 1983 report

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    A report is given by a team of Consultants on the estimated cost of converting wave energy to electrical energy by a 2 GW array of Lancaster Flexible Bag Devices and transmitting this to a sub-station on the west coast of Skye. Comparisons with the estimates made by the team developing the concept are made and discussed when not in agreement. A detailed engineering assessment is presented.

  13. Improved grid operation through power smoothing control strategies utilizing dedicated energy storage at an electric vehicle charging station

    DEFF Research Database (Denmark)

    Martinsen, Thomas; Holjevac, Ninoslav; Bremdal, Bernt A.

    2016-01-01

    project (Flex-ChEV) supported by the ERA-Net Smart Grid FP7 program. The principal asset of the proposed charging station (CS) is a dedicated Energy Storage System (ESS) to compensate for adverse effects on the grid caused by peak charging demand and which could impose severe trials for the local DSO....... Furthermore, CS of this kind could serve multiple business purposes in a smart grid. It can serve as a hub for seamless integration of local renewable and distributed energy resources, it can provide added flexibility for the local grid through different ancillary services and it can act as an efficient......This paper addresses the principal service aspects for electric vehicles (EV), as well as issues related to energy storage design, charging station integration into power system and load management issues. It builds on the research conducted in the Flexible Electric Vehicle Charging Infrastructure...

  14. Final environmental statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2: (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1981-09-01

    The proposed action is the issuance of operating licenses to the Texas Utilities Generating Company for the startup and operation of Units 1 and 2 of the Comanche Peak Steam Electric Station located on Squaw Creek Reservoir in Somervell County, Texas, about 7 km north-northeast of Glen Rose, Texas, and about 65 km southwest of Fort Worth in north-central Texas. The information in this environmental statement represents the second assessment of the environmental impact associated with the Comanche Peak Steam Electric Station pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 of the Commission's Regulations. After receiving an application to construct this station, the staff carried out a review of impact that would occur during its construction and operation. This evaluation was issued as a Final Environmental Statement -- Construction Phase. After this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and public hearings in Glen Rose, Texas, the US Atomic Energy Commission (now US Nuclear Regulatory Commission) issued construction permits for the construction of Units 1 and 2 of the Comanche Peak Steam Electric Station. 16 figs., 34 tabs

  15. Periodical inspection in nuclear power stations

    International Nuclear Information System (INIS)

    1986-01-01

    Periodical inspection is presently being made of eight nuclear power plants in nuclear power stations. Up to the present time, in three of them, failures as follows have been observed. (1) Unit 3 (PWR) of the Mihama Power Station in The Kansai Electric Power Co., Inc. Nineteen heat-transfer tubes of the steam generators were plugged up due to failure. A fuel assembly with a failed spring fixture and in another the control-rod cluster with a failed control rod fixture were replaced. (2) Unit 2 (PWR) of the Oi Power Station in The Kansai Electric Power Co., Inc. Eight heat-transfer tubes of the heat exchangers were plugged up due to failure. (3) Unit 6 (BWR) of the Fukushima Nuclear Power Station I in The Tokyo Electric Power Co., Inc. A fuel assembly with leakage was replaced. (Mori, K.)

  16. Functional utilization of control and digital protection systems in distribution substations; Aproveitamento funcional de sistemas de controle e protecao digitais em subestacoes de distribuicao

    Energy Technology Data Exchange (ETDEWEB)

    Brittes, Jose Luiz Pereira

    1996-07-01

    The application of Digital Protection and Control Systems (DPCS) in Utilities substations is a fundamental part for their Information System. Technological progress in Telematics provides nowadays, the implementation of open digital systems. But it is the wide exploitation of its potentiality that will be one of the survival factor in the competitive and multi-affair environment dictated by the new worldwide economical order. This exploitation is carried out in three levels inside the substation: at bay level, with inherent technological benefits, such as more efficient and reliable protection, data acquisition and registration, and smart control; at central level (substation), by the implantation of automatics with enormous operational and management profits; and a remote level, to whom DPCS's transpire like a very sophisticated large frame remote terminal units. (author)

  17. Functional utilization of control and digital protection systems in distribution substations; Aproveitamento funcional de sistemas de controle e protecao digitais em subestacoes de distribuicao

    Energy Technology Data Exchange (ETDEWEB)

    Brittes, Jose Luiz Pereira

    1996-07-01

    The application of Digital Protection and Control Systems (DPCS) in Utilities substations is a fundamental part for their Information System. Technological progress in Telematics provides nowadays, the implementation of open digital systems. But it is the wide exploitation of its potentiality that will be one of the survival factor in the competitive and multi-affair environment dictated by the new worldwide economical order. This exploitation is carried out in three levels inside the substation: at bay level, with inherent technological benefits, such as more efficient and reliable protection, data acquisition and registration, and smart control; at central level (substation), by the implantation of automatics with enormous operational and management profits; and a remote level, to whom DPCS's transpire like a very sophisticated large frame remote terminal units. (author)

  18. Internal Arc: People safety in the electrical wiring

    International Nuclear Information System (INIS)

    Inchausti, J. M.

    2009-01-01

    The aim of this article is to describe the internal arc phenomenon, an extremely fast, almost explosive and unattended process of transformation form an initial electric power to the generation of a pressure and heat wave inside the medium its produced its consequences for safety, current methods of limiting them and current regulations in general for equipment used in medium-voltage electrical distribution networks. Taking into account that this type of equipment is found thought the distribution network in both public buildings and unrestricted access areas, safety (of operators and the general public) must be taken into account in the design of equipment and installations to minimize the risk of internal arcs occurring. This is the gist of, for example, ITC 16 of the Spanish Regulation on Power Plants and transformer substations. In addition to the construction aspects specific to each device in which the manufacturer has to takes steps to minimize the risks of an internal arcs occurring. This is the gist of, for example, ITC 16 of the Spanish Regulation on Power Plants and transformer substations. In addition to the construction aspects specific to each device in which an internal arc occurring, it is understood to be vitally important that users, installers and designers of Medium Voltage installations are familiar with the installation conditions stated by the manufacturer and thus avoid risks. (Author) 14 refs

  19. The insulation coordination and surge arrester design for HTS cable system in Icheon substation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hansang, E-mail: Hansang80@korea.ac.kr [School of Railway and Electrical Engineering, Kyungil University, Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do 712-701 (Korea, Republic of); Yoon, Dong-Hee [Department of New and Renewable Energy, Kyungil University, Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do 712-701 (Korea, Republic of); Lee, Seung-Ryul [Korea Electrotechnology Research Institute, Naeson-dong, Uiwang-si, Gyeonggi-do 437-080 (Korea, Republic of); Yang, Byeong-Mo [Korea Electric Power Research Institute, Munji-dong, Yuseong-gu, Daejeon 305-760 (Korea, Republic of); Jang, Gilsoo, E-mail: gjang@korea.ac.kr [School of Electrical Engineering, Korea University, Anam-dong 5-ga, Seongbuk-gu, Seoul 136-713 (Korea, Republic of)

    2013-01-15

    Highlights: ► It is necessary to study lightning response of the HTS cable. ► The analytic model has been developed for the HTS cable in the Icheon substation. ► Well-designed surge arrester has been verified through PSCAD/EMTDC simulations. -- Abstract: This paper proposes an insulation coordination and surge arrester design for HTS (High-Temperature Superconducting) cable system in Icheon substation in Korea. In the aspect of the economic analysis, since the HTS cable is very expensive, the insulation coordination to prevent the dielectric breakdown caused by the lightning surge should be considered carefully. Also, in the aspect of the power system reliability, since the HTS cable has much more capacity compared than conventional power cables and the ripple effect from the HTS cable failure may lead to the wide area blackout, an intensive study for insulation coordination from lightning surge is one of the most important considerations. In this paper, the insulation coordination for lightning surge is verified using HTS cable and power equipment models and the design of the proper surge arrester is proposed.

  20. Reconfigurable Magneto-Electric Dipole Antennas for Base Stations in Modern Wireless Communication Systems

    Directory of Open Access Journals (Sweden)

    Lei Ge

    2018-01-01

    Full Text Available Magneto-electric (ME dipole antennas, with the function of changing the antenna characteristics, such as frequency, polarization, or radiation patterns, are reviewed in this paper. The reconfigurability is achieved by electrically altering the states of diodes or varactors to change the surface currents distributions or reflector size of the antenna. The purpose of the designs is to obtain agile antenna characteristics together with good directive radiation performances, such as low cross-polarization level, high front-to-back ratio, and stable gain. By reconfiguring the antenna capability to support more than one wireless frequency standard, switchable polarizations, or cover tunable areas, the reconfigurable ME dipole antennas are able to switch functionality as the mission changes. Therefore, it can help increase the communication efficiency and reduce the construction cost. This shows very attractive features in base station antennas of modern wireless communication applications.

  1. Energy Management and Control of Plug-In Hybrid Electric Vehicle Charging Stations in a Grid-Connected Hybrid Power System

    Directory of Open Access Journals (Sweden)

    Sidra Mumtaz

    2017-11-01

    Full Text Available The charging infrastructure plays a key role in the healthy and rapid development of the electric vehicle industry. This paper presents an energy management and control system of an electric vehicle charging station. The charging station (CS is integrated to a grid-connected hybrid power system having a wind turbine maximum power point tracking (MPPT controlled subsystem, photovoltaic (PV MPPT controlled subsystem and a controlled solid oxide fuel cell with electrolyzer subsystem which are characterized as renewable energy sources. In this article, an energy management system is designed for charging and discharging of five different plug-in hybrid electric vehicles (PHEVs simultaneously to fulfil the grid-to-vehicle (G2V, vehicle-to-grid (V2G, grid-to-battery storage system (G2BSS, battery storage system-to-grid (BSS2G, battery storage system-to-vehicle (BSS2V, vehicle-to-battery storage system (V2BSS and vehicle-to-vehicle (V2V charging and discharging requirements of the charging station. A simulation test-bed in Matlab/Simulink is developed to evaluate and control adaptively the AC-DC-AC converter of non-renewable energy source, DC-DC converters of the storage system, DC-AC grid side inverter and the converters of the CS using adaptive proportional-integral-derivate (AdapPID control paradigm. The effectiveness of the AdapPID control strategy is validated through simulation results by comparing with conventional PID control scheme.

  2. UMTS Network Stations

    Science.gov (United States)

    Hernandez, C.

    2010-09-01

    The weakness of small island electrical grids implies a handicap for the electrical generation with renewable energy sources. With the intention of maximizing the installation of photovoltaic generators in the Canary Islands, arises the need to develop a solar forecasting system that allows knowing in advance the amount of PV generated electricity that will be going into the grid, from the installed PV power plants installed in the island. The forecasting tools need to get feedback from real weather data in "real time" from remote weather stations. Nevertheless, the transference of this data to the calculation computer servers is very complicated with the old point to point telecommunication systems that, neither allow the transfer of data from several remote weather stations simultaneously nor high frequency of sampling of weather parameters due to slowness of the connection. This one project has developed a telecommunications infrastructure that allows sensorizadas remote stations, to send data of its sensors, once every minute and simultaneously, to the calculation server running the solar forecasting numerical models. For it, the Canary Islands Institute of Technology has added a sophisticated communications network to its 30 weather stations measuring irradiation at strategic sites, areas with high penetration of photovoltaic generation or that have potential to host in the future photovoltaic power plants connected to the grid. In each one of the stations, irradiance and temperature measurement instruments have been installed, over inclined silicon cell, global radiation on horizontal surface and room temperature. Mobile telephone devices have been installed and programmed in each one of the weather stations, which allow the transfer of their data taking advantage of the UMTS service offered by the local telephone operator. Every minute the computer server running the numerical weather forecasting models receives data inputs from 120 instruments distributed

  3. Electrical energy and cost for the mirror fusion test facility

    International Nuclear Information System (INIS)

    Pence, G.

    1983-01-01

    An operational scenario has been developed for the Mirror Fusion Test Facility (MFTF-B) based on the System Requirements, our experience with existing systems, and discussions with the project engineers and designers who are responsible for the systems. This scenario was used to predict the amount of electrical energy needed for running the facility. A generic type listing is included for the equipment considered in each system. A figure shows the anticipated power drain during a five-minute shot sequence from the 115-kV substation, and from the 230-kV and direct feed substations. At this time, the three major substations that will be used for the MFTF-B are billed under three different rate schedules. A table lists these schedules and what they are anticipated as being when the facility becomes operational. The system availability, which is expected to be 0.7 or better, has not been factored into these calculations. This gives a worst case cost for the MFTF-B. Based on this study, it appears that our energy bill will be over $500 000 per month, on the average. This expenditure will constitute a significant portion of the budget needed to operate the MFTF-B. As the systems are refined, and a more accurate picture is obtained as to the size and operational cycles of the equipment, this report will be updated

  4. District Heating Demonstration project. Bydgoszcz, Poland, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The project was finished in January 1999. The present final report outlines the activities of the pilot project. The activities of the project were: Development of a general model or a design strategy for the modernisation of group substations; Training of selected staff in updated design and latest technologies; Comparing experiences from the reconstructed heat exchanger station with alternative solutions; Investigation of potential sources of financing for the modernisation of the district heating system based on a revised feasibility study. The development of a general model for the future design of the heat exchanger station and the substations resulted in a design guideline which was used for the design of the heat exchanger station. KPEC selected the heat exchanger station CC02, located in area B1, as the object for the heat exchanger reconstruction. The station supplies 42 substations in 20 dwelling houses with a total heat demand of 11 MW. The design of the reconstruction began in the autumn of 1996. The equipment was procured during the spring of 1997 and the bulk of the installation work was finished by October 1997. The appointed design engineer participated in two study tours to Denmark. During the implementation the project was enlarged with an addendum. The addendum consisted of a modernisation of twelve building substations. The monitoring programme was enlarged accordingly and the efficiency of the two solutions were compared and evaluated through the monitoring programme. Even though some of the data are rather limited, the monitoring programme reveals a tendency towards the substation modernisation being twice as efficient as the heat exchanger modernisation. The reconstruction of the heat exchanger station has indicated a heat saving potential of 10% whereas the substation project has indicated a heat saving potential of 20%. The project further shows a huge potential for power savings in the main pumps due to the automatic control. (EHS)

  5. Kinematic analysis and simulation of a substation inspection robot guided by magnetic sensor

    Science.gov (United States)

    Xiao, Peng; Luan, Yiqing; Wang, Haipeng; Li, Li; Li, Jianxiang

    2017-01-01

    In order to improve the performance of the magnetic navigation system used by substation inspection robot, the kinematic characteristics is analyzed based on a simplified magnetic guiding system model, and then the simulation process is executed to verify the reasonability of the whole analysis procedure. Finally, some suggestions are extracted out, which will be helpful to guide the design of the inspection robot system in the future.

  6. Fault and load flows analysis of electricity transmission and distribution system in Casanare (Colombia)

    OpenAIRE

    Castro-Galeano, Juan Carlos; Cabra-Sarmiento, Wilson Javier; Ortiz-Portilla, Jhony Fernando

    2017-01-01

    Abstract This article describes a simulation of the electrical local distribution and regional transmission system of Enerca S.A. E.S.P. at 34.5 kV and 115 kV, identifying the most critical circuits and substations. The company is located in one of the major petroleum production areas in Colombia, and because of a massive growth in this sector, the electrical company expanded its networks in a radial way. This expansion was improvised and poorly planned due to the accelerated need to meet the...

  7. Maritime Electric Co. Ltd. annual report, 1992

    International Nuclear Information System (INIS)

    1992-01-01

    Maritime Electric Company is a Canadian investor-owned electric utility based in Prince Edward Island. Established in 1918, the Company owns and operates a fully integrated system providing for the generation, transmission, and distribution of electricity throughout the Island. Maritime Electric operates generating plants in Charlottetown and Borden, and has an equity interest in NB Power's unit in Dalhousie, New Brunswick. Its 4,400 km distribution system and 560 km transmission system are linked to the mainland power grid by two submarine cables between the Island and the province of New Brunswick. This report describes the Company's operations, power production and sales for the year, with relevant statistical information. Financial statements are also included. In 1992 the Victoria Cross distribution substation was rebuilt. Earnings per share in 1992 were $1.85 compared with $1.79 in 1991. Demand side management initiatives were further enhanced and the plant life extension program continued at the Charlottetown Generating Plant. A ten year summary is included. 7 figs

  8. Tucurui`s 500 kV S F{sub 6} gas-insulated substation modeling for fast transients - field tests comparison

    Energy Technology Data Exchange (ETDEWEB)

    Lima Filho, Joao Ferreira de; Pazo Blanco, Flavio A.F.; D` Ajuz, Ary; Nascimento, Lidio F.A. [ELETRONORTE, Brasilia, DF (Brazil)

    1994-12-31

    Many problems in insulation, devices and equipment have been resulted from switching operations in the 500 kV Gas-Insulated Substation (GIS) of Tucurui power plant. Disconnector closing or opening action can subject the GIS components to great stresses from excessive voltages at high frequencies caused by successive reflections of travelling waves at discontinuities (1,2,3). Field tests were carried out in September 18-23, 1991 to verify the actual GIS stresses at Tucurui. From these results simulations on the Alternative Transients Program (ATP) were performed in order to check the substation modeling. This paper presents and discusses the Tucurui GIS modeling for switching fast transients and its field test validation. (author) 8 refs., 6 figs.

  9. Improvements in the computation of balances and localization of commercial losses of electric energy in 0.38-kV networks

    International Nuclear Information System (INIS)

    Vorotnitskii, V. Z.; Zaslonov, S. V.; Lysyuk, S. S.

    2006-01-01

    An example of four 0.38-kV overhead distribution lines fed from a 10/0.4-kV transformer substation of the Grodno Electrical Networks (Belarus') and supplying electricity to a cottage area is used for analyzing energy balances and commercial losses in the networks. It is shown that the reliability of such analysis can be ensured by the use of modern software and electronic energy meters recording a retrospective of half-hourly intervals of active and reactive electric energy

  10. Electrical Systems for Wave Energy Conversion

    Energy Technology Data Exchange (ETDEWEB)

    Bostroem, Cecilia

    2011-07-01

    Wave energy is a renewable energy source with a large potential to contribute to the world's electricity production. There exist several technologies on how to convert the energy in the ocean waves into electric energy. The wave energy converter (WEC) presented in this thesis is based on a linear synchronous generator. The generator is placed on the seabed and driven by a point absorbing buoy on the ocean surface. Instead of having one large unit, several smaller units are interconnected to increase the total installed power. To convert and interconnect the power from the generators, marine substations are used. The marine substations are placed on the seabed and convert the fluctuating AC from the generators into an AC suitable for grid connection. The work presented in the thesis focuses on the first steps in the electric energy conversion, converting the voltage out from the generators into DC, which have an impact on the WEC's ability to absorb and produce power. The purpose has been to investigate how the generator will operate when it is subjected to different load cases and to obtain guidelines on how future systems could be improved. Offshore experiments and simulations have been done on full scale generators connected to four different loads, i.e. one linear resistive load and three different non-linear loads representing different cases for grid connected WECs. The results show that the power can be controlled and optimized by choosing a suitable system for the WEC. It is not obvious which kind of system is the most preferable, since there are many different parameters that have an impact on the system performance, such as the size of the buoy, how the generator is designed, the number of WECs, the highest allowed complexity of the system, costs and so on. Therefore, the design of the electrical system should preferably be carried out in parallel with the design of the WEC in order to achieve an efficient system

  11. Optimisation of the high voltage substation direct lightning stroke protection system; Optimisation de systeme de protection des postes haute tension contre le coup de foudre direct

    Energy Technology Data Exchange (ETDEWEB)

    Wahab, Y.A.; Abidin, Z.Z. [Tenaga Nasional Berhad (Malaysia); Sadovic, S. [Sadovic Consultant, 92 - Asnieres (France)

    2005-04-01

    This paper presents results of the study dealing with the application of lightning rods for the substation direct stroke protection. Lightning rod locations and heights are determined using simulation software Sigma ssh. This software uses a three-dimensional Monte Carlo electro geometric modeling. Study results for one particular 275 kV and one 500 kV substation are presented. (authors)

  12. Torness: proposed nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The need for and desirability of nuclear power, and in particular the proposed nuclear power station at Torness in Scotland, are questioned. Questions are asked, and answered, on the following topics: position, appearance and cost of the proposed Torness plant, and whether necessary; present availability of electricity, and forecast of future needs, in Scotland; energy conservation and alternative energy sources; radiation hazards from nuclear power stations (outside, inside, and in case of an accident); transport of spent fuel from Torness to Windscale; radioactive waste management; possibility of terrorists making a bomb with radioactive fuel from a nuclear power station; cost of electricity from nuclear power; how to stop Torness. (U.K.)

  13. Measurements and simulations for peak electrical load reduction in cooling dominated climate

    International Nuclear Information System (INIS)

    Sadineni, Suresh B.; Boehm, Robert F.

    2012-01-01

    Peak electric demand due to cooling load in the Desert Southwest region of the US has been an issue for the electrical energy suppliers. To address this issue, a consortium has been formed between the University of Nevada Las Vegas, Pulte Homes (home builder) and NV Energy (local utility) in order to reduce the peak load by more than 65%. The implemented strategies that were used to accomplish that goal consist of energy efficiency in homes, onsite electricity generation through roof integrated PV, direct load control, and battery storage at the substation level. The simulation models developed using building energy analysis software were validated against measured data. The electrical energy demand for the upgraded home during peak period (1:00–7:00 PM) decreased by approximately 37% and 9% compared to a code standard home of the same size, due to energy efficiency and PV generation, respectively. The total decrease in electrical demand due to energy efficiency and PV generation during the peak period is 46%. Additionally, a 2.2 °C increase in thermostat temperature from 23.9 °C to 26.1 °C between 4:00 PM and 7:00 PM has further decreased the average demand during the peak period by 69% of demand from a standard home. -- Highlights: ► A study to demonstrate peak load reductions of 65% at the substation. ► A new residential energy efficient community named Villa Trieste is being developed. ► The peak demand from the homes has decreased by 37% through energy efficiency. ► A 1.8 kWp system along with energy efficiency measures decreased peak by 46%.

  14. Application of wire electrodes in electric discharge machining of metal samples of reactor blocks of the operative atomic power station

    International Nuclear Information System (INIS)

    Gozhenko, S.V.

    2007-01-01

    Features of application of electroerosive methods are considered during the process of direct definition of properties of metal of the equipment of power units of the atomic power station. Results of development of a complex of the equipment for wire electric discharge machining of metal templet and its use are presented at the control of the basic metal of the main circulating pipelines over blocks of the atomic power station of Ukraine over long terms of operation

  15. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The Shippingport Atomic Power Station was located on the Ohio River in Shippingport Borough (Beaver County), Pennsylvania, USA. The US Atomic Energy Commission (AEC) constructed the plant in the mid-1950s on a seven and half acre parcel of land leased from Duquesne Light Company (DLC). The purposes were to demonstrate and to develop Pressurized Water Recovery technology and to generate electricity. DLC operated the Shippingport plant under supervision of (the successor to AEC) the Department of Energy (DOE)-Naval Reactors (NR) until operations were terminated on October 1, 1982. NR concluded end-of-life testing and defueling in 1984 and transferred the Station's responsibility to DOE Richland Operations Office (RL), Surplus Facility Management Program Office (SFMPO5) on September 5, 1984. SFMPO subsequently established the Shippingport Station Decommissioning Project and selected General Electric (GE) as the Decommissioning Operations Contractor. This report is intended to provide an overview of the Shippingport Station Decommissioning Project

  16. Process for improving the load factor of an electricity generating power station

    International Nuclear Information System (INIS)

    Rostaing, Michel.

    1974-01-01

    A description is given of a process for improving the load factor of an electricity generating power station feeding a supply network in which all or part of the power not required by the network during off-peak hours is used for producing hydrogen which is then stored. The stored hydrogen is then burned and the heat generated is employed for superheating the steam generated by the nuclear reactor of the power plant. This combustion is carried out permanently. The hydrogen is produced by water electrolysis. The oxygen also produced in this manner is used as a comburent in the combustion of the hydrogen. The reactor is of the pressurized water type [fr

  17. Developmental state and perspectives of USSR power stations, espec. nuclear power stations

    International Nuclear Information System (INIS)

    1983-01-01

    According to the resolutions of the 25th and 26th party congresses of the CPSU, the Soviet electric and thermal energy economy envisages as the mainstreams in development: Energy projects based on nuclear fuel, i.e. nuclear power stations (NPS), nuclear heat- and -power stations (NHPS) and nuclear heat stations (NHS); fuel-energy complexes: Ekibastuz, Kansk-Achinsk, West-Siberian complex (Tyumen); power stations utilizing non-conventional regenerative energy sources, i.e. solar, geothermal, MHD power stations. Further down, an overview is given on the developmental perspectives of nuclear-heat and nuclear-power economy and on the development of energy management based on fossil fuels. (orig./UA) [de

  18. Fault diagnosis methods for district heating substations

    Energy Technology Data Exchange (ETDEWEB)

    Pakanen, J.; Hyvaerinen, J.; Kuismin, J.; Ahonen, M. [VTT Building Technology, Espoo (Finland). Building Physics, Building Services and Fire Technology

    1996-12-31

    A district heating substation is a demanding process for fault diagnosis. The process is nonlinear, load conditions of the district heating network change unpredictably and standard instrumentation is designed only for control and local monitoring purposes, not for automated diagnosis. Extra instrumentation means additional cost, which is usually not acceptable to consumers. That is why all conventional methods are not applicable in this environment. The paper presents five different approaches to fault diagnosis. While developing the methods, various kinds of pragmatic aspects and robustness had to be considered in order to achieve practical solutions. The presented methods are: classification of faults using performance indexing, static and physical modelling of process equipment, energy balance of the process, interactive fault tree reasoning and statistical tests. The methods are applied to a control valve, a heat excharger, a mud separating device and the whole process. The developed methods are verified in practice using simulation, simulation or field tests. (orig.) (25 refs.)

  19. About the Territorial Potential of the Construction of Battery-Charging Stations for Autonomous Electric Motor Vehicles in the Regions

    Directory of Open Access Journals (Sweden)

    Shilova Lyubov

    2016-01-01

    Full Text Available The article describes the main current trends in the development of electric motor vehicles with "zero emission" as well as the battery-charging stations concerned. The study is based on a preliminary comparative analysis of the RF regions with respect to five indices (average per capita income, number of private cars in the region, air pollution level, provision of the region with power supply and the potential use of local renewable energy resources, and it gives some recommendations on the prospects of possible construction of battery-charging stations in the regions.

  20. IEEE standard for type test of class 1E electric cables, field splices, and connections for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1974-01-01

    The Institute of Electrical and Electronics Engineers has generated this document to provide guidance for developing a program to type test cables, field splices, and connections and obtain specific type test data. It supplements IEEE Std 323-1974 Standard for Qualifying Class IE Equipment for Nuclear Power Generating Stations, which describes basic requirements for equipment qualification. It is the integrated performance of the structures, fluid systems, the electrical systems, the instrumentation systems of the station, and in particular, the plant protection system, that limits the consequences of accidents. Seismic effects on installed cable systems are not within the scope of this document. Section 2 of this guide is an example of type tests. It is the purpose of this guide to deal with cable and connections; however, at the time of issue, detailed examples of tests for connections were not available

  1. IEEE Std 383-1974: IEEE standard for type test of Class IE electric cables, field splices, and connections for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard provides direction for establishing type tests which may be used in qualifying Class 1E electric cables, field splices, and other connections for service in nuclear power generating stations. General guidelines for qualifications are given in IEEE Std 323-1974, Standard for Qualifying Class IE Electric Equipment for Nuclear Power Generating Stations. Categories of cables covered are those used for power control and instrumentation services. Though intended primarily to pertain to cable for field installation, this guide may also be used for the qualification of internal wiring of manufactured devices. This guide does not cover cables for service within the reactor vessel

  2. Simulation of the Static VAR Compensator Culiacan Three Substation for the Analysis of Transients

    Directory of Open Access Journals (Sweden)

    Coronel-Mercado Luis Enrique

    2013-06-01

    Full Text Available Since its emergence in the late 60’s the FACTS (Flexible AC Transmission Systems have been and continue to be studied and implemented in all electrical networks around the world, becoming an essential element for stability, control and maximum exploitation of thereof. One of the most used FACTS devices is the Static VAR Compensator or SVC. In this work, the modeling in Simulink of the Static VAR Compensator installed at the substation Culiacán Tres (CUT belonging to CFE is presented. The SVC is the ability of ±100 MVAR and ABB brand. The modeling was performed to visually program in detail the different subsystems in Simulink such as the timing unit, the TSC (thyristor switched capacitor, TCR (thyristor controlled reactors, filters of the 5th and the 7th harmonic, the transformer bank, the control unit, distribution unit and the measurement unit. Data for major components were taken from data sheet and equipment manuals. ASPEN software was used in order to obtain Thevenin equivalent of the EPS to connect to them the SVC model to test the step and three-phase short circuit. The results of these tests were compared with test results of commissioning of the SVC.

  3. A Bi-Level Optimization Approach to Charging Load Regulation of Electric Vehicle Fast Charging Stations Based on a Battery Energy Storage System

    Directory of Open Access Journals (Sweden)

    Yan Bao

    2018-01-01

    Full Text Available Fast charging stations enable the high-powered rapid recharging of electric vehicles. However, these stations also face challenges due to power fluctuations, high peak loads, and low load factors, affecting the reliable and economic operation of charging stations and distribution networks. This paper introduces a battery energy storage system (BESS for charging load control, which is a more user-friendly approach and is more robust to perturbations. With the goals of peak-shaving, total electricity cost reduction, and minimization of variation in the state-of-charge (SOC range, a BESS-based bi-level optimization strategy for the charging load regulation of fast charging stations is proposed in this paper. At the first level, a day-ahead optimization strategy generates the optimal planned load curve and the deviation band to be used as a reference for ensuring multiple control objectives through linear programming, and even for avoiding control failure caused by insufficient BESS energy. Based on this day-ahead optimal plan, at a second level, real-time rolling optimization converts the control process to a multistage decision-making problem. The predictive control-based real-time rolling optimization strategy in the proposed model was used to achieve the above control objectives and maintain battery life. Finally, through a horizontal comparison of two control approaches in each case study, and a longitudinal comparison of the control robustness against different degrees of load disturbances in three cases, the results indicated that the proposed control strategy was able to significantly improve the charging load characteristics, even with large disturbances. Meanwhile, the proposed approach ensures the least amount of variation in the range of battery SOC and reduces the total electricity cost, which will be of a considerable benefit to station operators.

  4. BPA/Lower Valley transmission project. Final environmental impact statement

    International Nuclear Information System (INIS)

    1998-06-01

    Bonneville Power Administration and Lower Valley Power and Light, Inc. propose to solve a voltage stability problem in the Jackson and Afton, Wyoming areas. Lower Valley buys electricity from BPA and then supplies it to the residences and businesses of the Jackson and Afton, Wyoming areas. BPA is considering five alternatives. For the Agency Proposed Action, BPA and Lower Valley would construct a new 115-kV line from BPA's Swan Valley Substation near Swan Valley in Bonneville County, Idaho about 58 km (36 miles) east to BPA's Teton Substation near Jackson in Teton County, Wyoming. The new line would be next to an existing 115-kV line. The Single-Circuit Line Alternative has all the components of the Agency Proposed Action except that the entire line would be supported by single-circuit wood pole H-frame structures. the Short Line Alternative has all the components of the Single-Circuit Line Alternative except it would only be half as long. BPA would also construct a new switching station near the existing right-of-way, west or north of Targhee Tap. Targhee Tap would then be removed. For the Static Var Compensation Alternative, BPA would install a Static Var Compensator (SVC) at Teton or Jackson Substation. An SVC is a group of electrical equipment placed at a substation to help control voltage on a transmission system. The No Action Alternative assumes that no new transmission line is built, and no other equipment is added to the transmission system

  5. Exhibition of electric and magnetic fields of extra-low frequency

    International Nuclear Information System (INIS)

    Rincon, Leonardo; Socadagui, Jorge; Roman, Francisco

    2001-01-01

    The existent norms were studied in the international environment regarding human beings' exhibition to electro-magnetic fields, under the points of view of the industrial frequency (60 Hz) and the time of exhibition. The norm CENELEC was selected (Committee Europeen of Normalisation Electro technique) ENV 50166-1. The electro-magnetic fields existent were measured in four substations of the Colombian interconnected system, locating the critical fields and relation them with the work places from the personnel exposed to this fields. In different areas of the substations studied they were values of electric field that violate the norm CENELEC, being the most critical case the areas of the module of line and of the patios of transformation. In magnetic field not it founded any violation of the mentioned norm. A serious case of exposed population was identified that corresponds to the gang in charge of carrying out the basic maintenance. This gang carries out its maintenance works in areas with critical electric fields and during superior times of exhibition to those permitted for the norm. The fields electrician and magnetic too were measured under the vain of transmission line of 115 kw and double vertical circuit. The measured values were compared with the values theoretical ob had by means of programs of calculation of fields electric and magnetic developed in the national university of Colombia, being obtained a very good approach for the case of the magnetic field. Using electro-magnetic field well known and trusts procedures, the measure probes were gauged in the laboratory of high voltage of the national university of Colombia

  6. Heuristic Storage System Sizing for Optimal Operation of Electric Vehicles Powered by Photovoltaic Charging Station

    Directory of Open Access Journals (Sweden)

    Erik Blasius

    2016-01-01

    Full Text Available This paper discusses the utilisation of PV systems for electric vehicles charging for transportation requirements of smart cities. The gap between PV power output and vehicles charging demand is highly variable. Therefore, there is a need for additional support from a public distribution grid or a storage device in order to handle the residual power. Long term measurement data retrieved from a charging station for 15 vehicles equipped with a PV system were used in the research. Low and high irradiation seasons influenced the PV output. The charging demand of electric vehicles varied over the course of a year and was correlated to weather conditions. Therefore, the sizing and performance of a supportive storage device should be evaluated in a statistical manner using long period observations.

  7. The Mounting process and dielectric tests of the Parque Caballero armored substation in SF6(220 Kv); Montaje y pruebas dielectricas de la estacion blindada en gas SF6 (220 kV) 'Parque Caballero'

    Energy Technology Data Exchange (ETDEWEB)

    Decoud, Carlos; Bobadilla, Alberto [ANDE - Administracion Nacional de Electricidad, Assuncion (Paraguay)

    2001-07-01

    This document approaches the aspects referring to the mounting and also dielectric tests for the Parque Caballero armored substation in SF6. This type of installation represents a innovation regarding substations in urban centres. The most relevant items in relation to the mounting process are shown in a summarized way, as well as the aspects related to dielectric tests executed during the substation commissioning.

  8. The study for defining the best technical and economical alternatives for the associated substation to the Tucurui hydraulic power plant - second stage; Estudo para definicao da melhor alternativa tecnico-economica para a subestacao elevadora-secionadora associada a Usina Hidroeletrica Tucurui - segunda etapa

    Energy Technology Data Exchange (ETDEWEB)

    Machado Junior, Camilo; Fukuoka, Nita; Rose, Eber Havila [ELETRONORTE, Brasilia, DF (Brazil)]. E-mail: eber@eln.gov.br; Martinez, Manuel Luis Barreira [Escola Federal de Engenharia de Itajuba, MG (Brazil). Inst. de Energia Eletrica. Dept. de Eletrotecnica; Violin, Airton

    2001-07-01

    This document presents a synthesis of the developed study for defining the switching scheme of the associated substation to the Tucurui hydraulic power plant second stage which is being constructed. In order to reduce the short circuit level in the first stage substation (in operation) to suitable values and, at the same time, to maintain the flexibility in the generator and transmission systems, it has been decided to install some series reactors between the substations in 550 Kv. The used methodology to define the suitable alternative is also discussed and the substation final configuration involving the first and second stages of the substation enlargement is presented through a illustration.

  9. In situ testing of the Shippingport Atomic Power Station electrical circuits

    International Nuclear Information System (INIS)

    Dinsel, M.R.; Donaldson, M.R.; Soberano, F.T.

    1987-04-01

    This report discusses the results of electrical in situ testing of selected circuits and components at the Shippingport Atomic Power Station in Shippingport, Pennsylvania. Testing was performed by EG and G Idaho in support of the United States Nuclear Regulatory Commission (USNRC) Nuclear Plant Aging Research (NPAR) Program. The goal was to determine the extent of aging or degradation of various circuits from the original plant, and the two major coreplant upgrades (representing three distinct age groups), as well as to evaluate previously developed surveillance technology. The electrical testing was performed using the Electrical Circuit Characterization and Diagnostic (ECCAD) system developed by EG and G for the US Department of Energy to use at TMI-2. Testing included measurements of voltage, effective series capacitance, effective series inductance, impedance, effective series resistance, dc resistance, insulation resistance and time domain reflectometry (TDR) parameters. The circuits evaluated included pressurizer heaters, control rod position indicator cables, miscellaneous primary system Resistance Temperature Detectors (RTDs), nuclear instrumentation cables, and safety injection system motor operated valves. It is to be noted that the operability of these circuits was tested after several years had elapsed because plant operations had concluded at Shippingport. There was no need following plant shutdown to retain the circuits in working condition, so no effort was expended for that purpose. The in situ measurements and analysis of the data confirmed the effectiveness of the ECCAD system for detecting degradation of circuit connections and splices because of high resistance paths, with most of the problems caused by corrosion. Results indicate a correlation between the chronological age of circuits and circuit degradation

  10. Distributed Cooperative Control of Multi Flywheel Energy Storage System for Electrical Vehicle Fast Charging Stations

    DEFF Research Database (Denmark)

    Sun, Bo; Dragicevic, Tomislav; Quintero, Juan Carlos Vasquez

    2015-01-01

    Plug-in electrical vehicles will play a critical role in future smart grid and sudden connection of electrical vehicles chargers may cause huge power-peaks with high slew-rates on grid. In order to cope with this issue, this paper applies a distributed cooperative control for fast charging station...... with dedicated paralleled flywheel-based energy storage system. The distributed DC-bus signaling method is employed in the power coordination of grid and flywheel converters, and a distributed secondary controller generates DC voltage correction term to adjust the local voltage set-point through a dynamic...... consensus based voltage observer by communicating with its neighbors. The control system can realize the power balancing and DC voltage regulation with low reliance on communications. Finally, real-time hardware-in-the-loop results have been reported in order to verify the feasibility of proposed approach....

  11. The Recharging Infrastructure Needs for Long Distance Travel by Electric Vehicles: A Comparison of Battery-Switching and Quick-Charging Stations

    DEFF Research Database (Denmark)

    Christensen, Linda; Jensen, Thomas Christian; Kaplan, Sigal

    2017-01-01

    of electric vehicles is beneficial when considering economic costs and benefits for operators and users, tax redistribution, and environmental externalities, even with a relatively modest market share; (ii) the number of required recharging stations for satisfaction of the travel demand is at the magnitude...

  12. A multi-factor GIS method to identify optimal geographic locations for electric vehicle (EV) charging stations

    Science.gov (United States)

    Zhang, Yongqin; Iman, Kory

    2018-05-01

    Fuel-based transportation is one of the major contributors to poor air quality in the United States. Electric Vehicle (EV) is potentially the cleanest transportation technology to our environment. This research developed a spatial suitability model to identify optimal geographic locations for installing EV charging stations for travelling public. The model takes into account a variety of positive and negative factors to identify prime locations for installing EV charging stations in Wasatch Front, Utah, where automobile emission causes severe air pollution due to atmospheric inversion condition near the valley floor. A walkable factor grid was created to store index scores from input factor layers to determine prime locations. 27 input factors including land use, demographics, employment centers etc. were analyzed. Each factor layer was analyzed to produce a summary statistic table to determine the site suitability. Potential locations that exhibit high EV charging usage were identified and scored. A hot spot map was created to demonstrate high, moderate, and low suitability areas for installing EV charging stations. A spatially well distributed EV charging system was then developed, aiming to reduce "range anxiety" from traveling public. This spatial methodology addresses the complex problem of locating and establishing a robust EV charging station infrastructure for decision makers to build a clean transportation infrastructure, and eventually improve environment pollution.

  13. Techno-economic and sensitivity analysis for grid-connected renewable energy electric boat charging station in Terengganu

    OpenAIRE

    Salleh N. A. S.; Muda W. M. W.

    2017-01-01

    In order to encourage the eco-friendly technologies in transportation sector, the reliance on fuel need to be reduced and the use of renewable energy (RE) technology as energy source are widely explored by researchers. Thus, this study focus on the feasibility of developing grid-connected renewable energy electric boat charging station for the fishermen in Terengganu using simulation-based method by HOMER software. Five year solar radiation and wind speed data were collected at Universiti Sul...

  14. Improving the performance of subtransmission through substation reinforcement; Melhoria do desempenho de sistemas de subtransmissao atraves de reforcos em substacoes

    Energy Technology Data Exchange (ETDEWEB)

    Paiva Mendes, Dilcemar de [Ceara Univ., Fortaleza, CE (Brazil); Melo, Albert Cordeiro Geber de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Pereira, Jose Luiz Rezende [Juiz de Fora Univ., MG (Brazil)

    1994-12-31

    This work presents an approach to the global reliability improve of power subtransmission systems through of reinforcements in critical components of the power substations. (author) 13 refs., 3 figs., 3 tabs.

  15. The smart kiosk substation for Smart Grids; Die intelligente Ortsnetzstation fuer das Smart Grid

    Energy Technology Data Exchange (ETDEWEB)

    Weber, Thomas [Schneider Electric Energy GmbH, Frankfurt (Germany); Vaupel, Steffen [Schneider Electric Energy GmbH, Kassel (Germany)

    2012-07-01

    The changes in the energy supply towards current and future needs call for new technologies and solutions resulting in the ''Smart Grid''. The smart kiosk substation describes an essential component for the additionally required optimization of the energy distribution networks - a complete functional unit of an economic and efficient compact substation, which successfully operates within the framework of a pilot project since the beginning of this year. In addition to an adjustable 630-kVA-local distribution transformer, control and signalling functions, to manage fault situations are included, allowing for the optimization of outage times. Measurement of network quality and an economic network protection complete the range of services. As is customary during the development of new products, high availability and free of maintenance (through utilization of standard components) whilst complying with current standards and regulations are being taken into account. Along with the demand for regenerative feed-ins to feed reactive power into the network as required, the regulating device allows for a much improved use of the voltage limits - in the low voltage grid as well. It is to be expected that the network expansion of the low voltage grid thus can be significantly optimized through these possibilities of regulation. (orig.)

  16. Introduction of Electric Vehicle Charging Stations to University Campuses: A Case Study for the University of Georgia from 2014 to 2017

    Directory of Open Access Journals (Sweden)

    Sierra Hovet

    2018-06-01

    Full Text Available Electric vehicles (EVs are becoming increasingly popular in the United States of America (USA. EVs attract buyers with benefits including energy efficiency and environmental friendliness. As EV usage grows, more public spaces are installing EV charging stations. This paper presents a comprehensive analysis of EV charging station usage at the University of Georgia (UGA in Athens, Georgia. Three ChargePoint EV charging stations at UGA were used to collect data about each of 3204 charging events that occurred from 10 April 2014 to 20 June 2017. The charging event data included start date, start time, length of parking time, length of charging time, amount of energy delivered, and the postal code entered by the user during ChargePoint account registration. Analytical methods were proposed to obtain information about EV charging behavior, charging station occupancy, and geolocation of charging station users. The methodology presented here was time- and cost-effective, as well as scalable to other organizations that own charging stations. Because this study took place at a university, the results presented here can be used as a reference for EV charging station usage in other college towns in the USA that do not have EV charging stations but are planning to develop EV infrastructure.

  17. Tobruk power station

    Energy Technology Data Exchange (ETDEWEB)

    Boergardts, B

    1978-01-01

    In February of 1975, the Electricity Corporation Benghazi (ECB) awarded a contract for the construction of a turnkey power station and seawater desalination plant in Tobruk, Libya to a consortium under the leadership of BBC Mannheim. This power station has an output of 129 MW and supplies about 24,000 m/sup 3/ of drinking water daily. It went into operation in 1977, two and a half years after the contract was awarded.

  18. National Account Energy Alliance Final Report for the Basin Electric Project at Northern Border Pipeline Company's Compressor Station #7, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    Sweetzer, Richard [Exergy Partners Corp.; Leslie, Neil [Gas Technology Institute

    2008-02-01

    A field research test and verification project was conducted at the recovered energy generation plant at Northern Border Pipeline Company Compressor Station #7 (CS#7) near St. Anthony. Recovered energy generation plant equipment was supplied and installed by ORMAT Technologies, Inc. Basin Electric is purchasing the electricity under a purchase power agreement with an ORMAT subsidiary, which owns and operates the plant.

  19. Report from investigation committee on the accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    Koshizuka, Seiichi

    2012-01-01

    Government's Investigation Committee on the Accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company published its final report on July 23, 2012. Results of investigation combined final report and interim report published on December 26, 2011. The author was head of accident accuse investigation team mostly in charge of site response, prior measure and plant behavior. This article reported author related technical investigation results focusing on site response and prior measures against tsunamis of units 1-3 of Fukushima Nuclear Power Stations. Misunderstanding of working state of isolation condenser of unit 1, unsuitability of alternative water injection at manual stop of high-pressure coolant injection (HPCI) system of unit 3 and improper prior measure against tsunami and severe accident were pointed out in interim report. Improper monitoring of suppression chamber of unit 2 and again unsuitable work for HPCI system of unit 3 were reported in final report. Thorough technical investigation was more encouraged to update safety measures of nuclear power stations. (T. Tanaka)

  20. Architecture at Hydro-Quebec. L'architecture a Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  1. Architecture at Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  2. Flexible Local Load Controller for Fast ElectricVehicle Charging Station Supplemented with Flywheel Energy Storage System

    DEFF Research Database (Denmark)

    Dragicevic, Tomislav; SUN, BO; Schaltz, Erik

    2014-01-01

    Electric vehicle charging infrastructure is hitting the stage where its impact on performance and operation of power systems becomes more and more pronounced. Aiming to utilize the existing power distribution infrastructure and delay its expansion, an approach that includes installation of dedica......Electric vehicle charging infrastructure is hitting the stage where its impact on performance and operation of power systems becomes more and more pronounced. Aiming to utilize the existing power distribution infrastructure and delay its expansion, an approach that includes installation...... of dedicated flywheel energy storage system (FESS) within the charging station and compensating some of the adverse effects of high power charging is explored in this paper. Although sharing some similarities with vehicle to grid (V2G) technology, the principal advantage of this strategy is the fact that many...

  3. The Miksova water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Miksova water power station. The Miksova water power station is part of the second derived cascade of hydro power stations on the river Vah. It was built at the end of a huge development in Slovak hydro-energy in the late 1950's and the beginning of the 1960's. It is the second water power station on this derived cascade, which is situated downstream the Hricov reservoir and water power station. At the power station, three turbine sets with vertical Kaplan turbines are installed with a total power output of 3 x 31.2 = 93.6 MW. With this power output the Miksova water power station (Miksova I) was the biggest water power station in the Slovak Republic until the construction of Pumping water power station Liptovska Mara. And it is still the biggest channel water power station on the Vah so far. It was put into operation during the period 1963 to 1965. There are three turbine sets with Kaplan turbines from CKD Blansko, with a synchronous hydro-alternator installed in the power station. Their installed capacity is 93.6 MW in total and the projected annual production of electrical energy is 207 GWh. The turbines are fi ve-bladed (on the Hricov and Povazska Bystrica water power stations they are four-bladed) and the impeller wheel has a diameter of 4800 mm. They are designed for extension of the head from 24.1 to 22.21 m and each of them has an absorption capacity of 134 m 3 .s -1 nd a nominal operating speed of 2.08 m 3 .s -1 , runaway speed 4.9 m 3 .s -1 . Each synchronous hydro-alternator has a maximum power output of 31.2 MW, a nominal voltage of 10.5 kV and power factor cos φ of 0.8. Power from the power station is led out through 110 kV switchgear. The water power station operates under automatic turbine mode of operation with remote indication and control from the Dispatch Centre at Vodne elektrarne, in Trencin. From start of operation until the end of 2003 all three turbine sets operated for a total of 450,500 running hours and the

  4. MINAC radiography performed on susquehanna Steam Electric Station Unit 1

    International Nuclear Information System (INIS)

    Bognet, J.C.

    1986-01-01

    Ten welds were volumetrically examined with a manual and automated ultrasonic (UT) system during a Susquehanna Steam Electric Station (SES) Unit 1 preservice inspection. The automated system had been recently developed and several problems were encountered in this first field application. The ten welds examined had a Sweepolet-to-Risor weld configuration, which further complicated the examination effort. This weld configuration has corrosion-resistant cladding applied to the outside and inside circumference and, as a result of an installation/removal/reinstallation sequence during plant construction, is often referred to as the double weld. After several attempts to obtain interpretable UT data failed (e.g., repeatable data), the examination effort was terminated. PP and L opted to pursue using the Miniature Linear Accelerator (MINAC) to perform radiographic examination. The results were referenced in the Susquehanna SES Unit 1 outage summary report and submitted to the NRC. The total effort was viewed as a complete success with no impact to the overall outage duration. All welds previously attempted by automated and manual UT were successfully examined using the MINAC

  5. Sound cable crossing brings inexpensive electric power to Long Island

    International Nuclear Information System (INIS)

    Grzan, J.; Goyette, R.

    1992-01-01

    This paper reports that while many electric-utility customers in New York State benefit from inexpensive hydroelectric power from Canada and upstate New York, lack of sufficient transmission connections have prevented this electricity from reaching Long Island. However, a newly constructed underground/underwater link capable of carrying 700-MW now transmits low-cost electricity to the island, saving money for customers. The self-contained fluid-filled cable used for the underwater portion of the project is the largest underwater cable in the world. The use of high-pressure, fluid-filled pipe-type cable on the land portion represents the largest application of paper-polypropylene-paper (PPP) insulated cable in the United States. State-of-the-art technologies were implemented in the use of temperature monitoring and leak detection systems, SF 6 gas-insulated substation, and underwater cable laying and embedment techniques

  6. Modeling of a Photovoltaic-Powered Electric Vehicle Charging Station with Vehicle-to-Grid Implementation

    Directory of Open Access Journals (Sweden)

    Azhar Ul-Haq

    2016-12-01

    Full Text Available This paper is aimed at modelling of a distinct smart charging station for electric vehicles (EVs that is suitable for DC quick EV charging while ensuring minimum stress on the power grid. Operation of the charging station is managed in such a way that it is either supplied by photovoltaic (PV power or the power grid, and the vehicle-to-grid (V2G is also implemented for improving the stability of the grid during peak load hours. The PV interfaced DC/DC converter and grid interfaced DC/AC bidirectional converter share a DC bus. A smooth transition of one operating mode to another demonstrates the effectiveness of the employed control strategy. Modelling and control of the different components are explained and are implemented in Simulink. Simulations illustrate the feasible behaviour of the charging station under all operating modes in terms of the four-way interaction among PV, EVs and the grid along with V2G operation. Additionally, a business model is discussed with comprehensive analysis of cost estimation for the deployment of charging facilities in a residential area. It has been recognized that EVs bring new opportunities in terms of providing regulation services and consumption flexibility by varying the recharging power at a certain time instant. The paper also discusses the potential financial incentives required to inspire EV owners for active participation in the demand response mechanism.

  7. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    Science.gov (United States)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  8. Scheme of substations: circuit breakers topology; El esquema de S.E.: interruptor y medio y algunas variantes del mismo, a la luz de la gestion privada de instalaciones de servicio publico

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Maximo B. [Sade Skanska S.A. (Argentina)

    2001-07-01

    This work approaches a topological scheme applicable for the entrance circuit breakers which are used in high voltage substations and also in substations from the rated voltage class of 115 Kv by many countries. It is a safe scheme due to providing a double connection for the feeder cables and more economical than the double circuit breakers option. Nevertheless, the scheme has some restrictions as follows: a) The premises of continuity are not accomplished in small substations b) It is possible to occur a responsibility conflict in relation to the main circuit breaker. In the private administration of public service facilities multiples jurisdictions can appear which require well defined limits, and the penalties due to outages can be minimized.

  9. Projected costs of generating electricity from nuclear and coal-fired power stations for commissioning in 1995

    International Nuclear Information System (INIS)

    1986-01-01

    This report updates and extends the previous NEA study, ''The Costs of Generating Electricity in Nuclear and Coal-fired Power Stations'', published by the OECD in late 1983. Despite the changed expectations concerning coal prices and the considerable movements in exchange rates since the first study was completed, the conclusions remain essentially the same. Nuclear Power is projected to be economically superior by a significant margin to coal-fired plants for base load electricity production in Europe, Japan and some regions of North America. In areas of North America in close proximity to supplies of cheap coal, this would be the more economic fuel, unless future nuclear investment costs can be reduced to match the best US and Canadian experience. In all regions considered, the economic advantage of both coal and nuclear over oil and gas-fired plants for commissioning in the mid-1990s is expected to be substantial. These conclusions are based on an analysis of cost projections for 900 MWe to 1400 MWe Light Water Reactors to be commissioned in 1995, operating at a levelised load factor of about 72 per cent over an assumed 25 years economic life and calculated with a 5 per cent (real) discount rate. This parallels the reference reactor selected for the NEA report ''The Economics of the Nuclear Fuel Cycle'', which was published by the OECD in June 1985, though it deviates somewhat from the reference conditions of the previous generation cost study. Contemporary coal-fired stations ranging in capacity from 330 MWe to 700 MWe with the same assumed economic life and load factor provide the basis for comparison. Some data are included on CANDU Pressurised Heavy Water Reactors, and a brief comment is annexed on the relevance of the comparisons for the smaller plants that may be of interest to countries with smaller electricity networks or where special circumstances apply

  10. Space Station solar water heater

    Science.gov (United States)

    Horan, D. C.; Somers, Richard E.; Haynes, R. D.

    1990-01-01

    The feasibility of directly converting solar energy for crew water heating on the Space Station Freedom (SSF) and other human-tended missions such as a geosynchronous space station, lunar base, or Mars spacecraft was investigated. Computer codes were developed to model the systems, and a proof-of-concept thermal vacuum test was conducted to evaluate system performance in an environment simulating the SSF. The results indicate that a solar water heater is feasible. It could provide up to 100 percent of the design heating load without a significant configuration change to the SSF or other missions. The solar heater system requires only 15 percent of the electricity that an all-electric system on the SSF would require. This allows a reduction in the solar array or a surplus of electricity for onboard experiments.

  11. Integrated planning of electric vehicles routing and charging stations location considering transportation networks and power distribution systems

    Directory of Open Access Journals (Sweden)

    Andrés Arias

    2018-09-01

    Full Text Available Electric Vehicles (EVs represent a significant option that contributes to improve the mobility and reduce the pollution, leaving a future expectation in the merchandise transportation sector, which has been demonstrated with pilot projects of companies operating EVs for products delivering. In this work a new approach of EVs for merchandise transportation considering the location of Electric Vehicle Charging Stations (EVCSs and the impact on the Power Distribution System (PDS is addressed. This integrated planning is formulated through a mixed integer non-linear mathematical model. Test systems of different sizes are designed to evaluate the model performance, considering the transportation network and PDS. The results show a trade-off between EVs routing, PDS energy losses and EVCSs location.

  12. Risk impact of planned maintenance configuration at South Texas Project Electric Generating Station

    International Nuclear Information System (INIS)

    Loh, W.T.; Fleming, K.N.; Grantom, C.R.

    2004-01-01

    This paper is based on a study done for the Houston Lighting and Power Company. The purpose of this study is to estimate the risk impact of planned maintenance configurations at South Texas Project Electric Generating Station (STPEGS). To date, the focus of the STP probabilistic safety assessment (PSA) program has been to analyze risk in terms of estimates of accident frequencies that are expressed on a time-averaged basis. Thus, estimates of quantities such as severe core damage frequency have been made such that the temporal variations of this frequency with changing plant configurations are averaged out over time. The only condition that has been imposed on these estimates is that the plant is initially operating at full power when potential initiating events might occur. (author)

  13. Magnetic substate populations of product nuclei in the /sup 11/B(d,p)/sup 12/B reaction

    Energy Technology Data Exchange (ETDEWEB)

    Tanaka, M; Ochi, S; Minamisono, T; Mizobuchi, A; Sugimoto, K [Osaka Univ., Toyonaka (Japan). Lab. of Nuclear Studies

    1976-05-31

    Magnetic substate populations of product nuclei in the /sup 11/B(d,p)/sup 12/B reaction have been measured in an energy range Esub(d) = 1.3-3.0 MeV at recoil angles of thetasub(R) = 55/sup 0/, 45/sup 0/ and 27/sup 0/-37/sup 0/. A static magnetic field (3 kG) was applied normal to the reaction plane to keep the nuclear orientation. Quadrupole effects on the implanted /sup 12/B in Ta were utilized to perturb the Zeeman splitting. NMR transitions were induced, and detected by the asymmetry change in the ..beta..-decay of /sup 12/B. From this information, the magnetic substate populations were determined, for the unique assignment of which the sign of the quadrupole interaction had to be known. For this purpose, a p-..gamma.. angular correlation was measured, which determined the alignment of the first excited state of /sup 12/B. A comparison of the present result with theoretical predictions is given, together with the resultant information about j-mixings in the /sup 12/B states.

  14. A Comparative Study on Substation Types and Network Layouts in Connection with Low-Energy District Heating Systems

    DEFF Research Database (Denmark)

    Tol, Hakan; Svendsen, Svend

    2012-01-01

    The study deals with low-energy district heating (DH) networks operating in low temperatures such as 55 °C in terms of supply and 25 °C in terms of return. The network layout, additional booster pumps, and different substation types such as storage tanks either equipped or not equipped in domesti...... for end-consumers were also studied, heat loss from these networks and the drop in temperature in the heat-carrier-supply medium being compared.......The study deals with low-energy district heating (DH) networks operating in low temperatures such as 55 °C in terms of supply and 25 °C in terms of return. The network layout, additional booster pumps, and different substation types such as storage tanks either equipped or not equipped in domestic...... hot water production site were examined. Effects of booster pumps on pipe dimensions in the latter case were investigated. Temperature drops during the summer months due to low heat demands of consumers were explored. Use of approaches such as looped networks and branched network layouts with bypasses...

  15. Answer to the dynamic (fretting effect) and static (oxide) behavior of electric contact surfaces: based on a five-year infrared thermographic study

    Science.gov (United States)

    Paez-Leon, Cristobal D.; Patino, Antonio R.; Aguillon, Luis

    1991-03-01

    This paper describes the results of a five-year study carried out in 38 power substations (230, 115, 34.5 and 13.8 Kv), located in the Western power electric system of CADAFE (Venezuela's national Electric Utility). A total of 154 hot spots were found between 1980 and 1982, a time span considered a reliable source of information in connection with methodology, term and results. The distribution of hot spots found during those years was 77, 33 and 44. The reduction of the spot/substation parameter was found to be 4.1, 3.3 and 3.1, respectively. Every item detected could have been the cause of major interruptions, locally and regionally, or even the system's blackout. The methodology used to determine the major concentration of findings and their location on the equipment, followed the sequence of Pareto's Diagram and Ishikawa's Graphic. Based on the results of the study whose results are presented here, a lubricant and compound-aid connector for Al-Al and bimetallic electric connections was formulated, developed, manufactured, tested (at IREQ laboratories) and traded (CONECTECH CAC- 01). To date, the whole process represents 12 years of work. The connector's behavior and reliability are being tested throughout Venezuela's national electric system (responsible for the supply of around 50,000 Gwh/year) with the use of 12 Tons of CONECTECH CAC-01.

  16. Final Environmental Statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1989-10-01

    In September 1981, the staff of the Nuclear Regulatory Commission (NRC) issued its Final Environmental Statement (NUREG-0775) related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446), located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. The NRC has prepared this supplement to NUREG-0775 to present its evaluation of the alternative of operating Comanche Peak with the installation of further severe-accident-mitigation design features. The NRC has discovered no substantial changes in the proposed action as previously evaluated in the Final Environmental Statement that are relevant to environmental concerns and bearing on the licensing of Comanche Peak Steam Electric Station, Units 1 and 2. 6 refs., 3 tabs

  17. Construction work management for nuclear power stations

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1982-01-01

    Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)

  18. Effects of aging on the structural, mechanical, and thermal properties of the silicone rubber current transformer insulation bushing for a 500 kV substation.

    Science.gov (United States)

    Wang, Zhigao; Zhang, Xinghai; Wang, Fangqiang; Lan, Xinsheng; Zhou, Yiqian

    2016-01-01

    In order to analyze the cracking and aging reason of the silicone rubber current transformer (CT) insulation bushing used for 8 years from a 500 kV alternating current substation, characteristics including Fourier transform infrared (FTIR) spectroscopy, mechanical properties analysis, hardness, and thermo gravimetric analysis have been carried out. The FTIR results indicated that the external surface of the silicone rubber CT insulation bushing suffered from more serious aging than the internal part, fracture of side chain Si-C bond was much more than the backbone. Mechanical properties and thermal stability results illustrated that the main aging reasons were the breakage of side chain Si-C bond and the excessive cross-linking reaction of the backbone. This study can provide valuable basis for evaluating degradation mechanism and aging state of the silicone rubber insulation bushing in electric power field.

  19. Electric vehicle equipment for grid-integrated vehicles

    Science.gov (United States)

    Kempton, Willett

    2013-08-13

    Methods, systems, and apparatus for interfacing an electric vehicle with an electric power grid are disclosed. An exemplary apparatus may include a station communication port for interfacing with electric vehicle station equipment (EVSE), a vehicle communication port for interfacing with a vehicle management system (VMS), and a processor coupled to the station communication port and the vehicle communication port to establish communication with the EVSE via the station communication port, receive EVSE attributes from the EVSE, and issue commands to the VMS to manage power flow between the electric vehicle and the EVSE based on the EVSE attributes. An electric vehicle may interface with the grid by establishing communication with the EVSE, receiving the EVSE attributes, and managing power flow between the EVE and the grid based on the EVSE attributes.

  20. Technical specifications: Susquehanna Steam Electric Station, Unit No. 2 (Docket No. 50-388). Appendix A to License No. NPF-22

    International Nuclear Information System (INIS)

    1984-03-01

    Susquehanna Steam Electric Station, Unit 2 Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  1. Water pollution and thermal power stations

    International Nuclear Information System (INIS)

    Maini, A.; Harapanahalli, A.B.

    1993-01-01

    There are a number of thermal power stations dotting the countryside in India for the generation of electricity. The pollution of environment is continuously increasing in the country with the addition of new coal based power stations and causing both a menace and a hazard to the biota. The paper reviews the problems arising out of water pollution from the coal based thermal power stations. (author). 2 tabs

  2. Oil leakage detection for electric power equipment based on ultraviolet fluorescence effect

    Science.gov (United States)

    Zhang, Jing; Wang, Jian-hui; Xu, Bin; Huang, Zhi-dong; Huang, Lan-tao

    2018-03-01

    This paper presents a method to detect the oil leakage of high voltage power equipment based on ultraviolet fluorescence effect. The method exploits the principle that the insulating oil has the fluorescent effect under the irradiation of specific ultraviolet light. The emission spectrum of insulating oil under excitation light with different wavelengths is measured and analyzed first. On this basis, a portable oil leakage detective device for high voltage power equipment is designed and developed with a selected 365 nm ultraviolet as the excitation light and the low light level camera as the fluorescence image collector. Then, the feasibility of the proposed method and device in different conditions is experimentally verified in the laboratory environment. Finally, the developed oil leakage detective device is applied to 500 kV Xiamen substation and Quanzhou substation. And the results show that the device can detect the oil leakage of high voltage electrical equipment quickly and conveniently even under the condition of a slight oil leakage especially in the low light environment.

  3. LAYOUT AND DESIGN OF ELECTROMOBILE CHARGING STATIONS AS URBAN ELEMENTS

    Directory of Open Access Journals (Sweden)

    Tomáš Chovan

    2015-12-01

    Full Text Available The contribution is dedicated to the processing of the problems of the insufficient charging for the electric vehicles within the concrete urbanistic centre. It brings a different perspective on the mobility, which is shown in the form of electric energy as the alternative for the needs of urbanization of the cities. It analyses electromobility, new technologies in the field of electric vehicles and the charging stations as the elements of the urbanism. In terms of the solution, the contribution is focused on the Košice city and the location of the public charging stations. Košice do not have sufficient amount of the public charging stations and until the 2014 there was only one public charging station. The contribution is focused on the designing of the parking places with the charging station placed on the appropriate parking places. The resulting design is created in the CAD system, it brings the view of the layout of the charging station at the shopping centre in the open space and in the parking house.

  4. Solar water heater for NASA's Space Station

    Science.gov (United States)

    Somers, Richard E.; Haynes, R. Daniel

    1988-01-01

    The feasibility of using a solar water heater for NASA's Space Station is investigated using computer codes developed to model the Space Station configuration, orbit, and heating systems. Numerous orbit variations, system options, and geometries for the collector were analyzed. Results show that a solar water heater, which would provide 100 percent of the design heating load and would not impose a significant impact on the Space Station overall design is feasible. A heat pipe or pumped fluid radial plate collector of about 10-sq m, placed on top of the habitat module was found to be well suited for satisfying water demand of the Space Station. Due to the relatively small area required by a radial plate, a concentrator is unnecessary. The system would use only 7 to 10 percent as much electricity as an electric water-heating system.

  5. Service hall in Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc

    International Nuclear Information System (INIS)

    Tawara, Shigesuke

    1979-01-01

    There are six BWR type nuclear power plants in the Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc. The service hall of the station is located near the entrance of the station. In the center of this service hall, there is the model of a nuclear reactor of full scale. This mock-up shows the core region in the reactor pressure vessel for the number one plant. The diameter and the thickness of the pressure vessel are about 5 m and 16 cm, respectively. The fuel assemblies and control rods are set just like the actual reactor, and the start-up operation of the reactor is shown colorfully and dynamically by pushing a button. When the control rods are pulled out, the boiling of water is demonstrated. The 1/50 scale model of the sixth plant with the power generating capacity of 1100 MWe is set, and this model is linked to the mock-up of reactor written above. The operations of a recirculating loop, a turbine and a condenser are shown by switching on and off lamps. The other exhibitions are shielding concrete wall, ECCS model, and many kinds of panels and models. This service hall is incorporated in the course of study and observation of civics. The good environmental effects to fishes and shells are explained in this service hall. Official buildings and schools are built near the service hall utilizing the tax and grant concerning power generation. This service hall contributes to give much freedom from anxiety to the public by the tour. (Nakai, Y.)

  6. Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1990-07-01

    The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

  7. Submerged AUV Charging Station

    Science.gov (United States)

    Jones, Jack A.; Chao, Yi; Curtin, Thomas

    2014-01-01

    Autonomous Underwater Vehicles (AUVs) are becoming increasingly important for military surveillance and mine detection. Most AUVs are battery powered and have limited lifetimes of a few days to a few weeks. This greatly limits the distance that AUVs can travel underwater. Using a series of submerged AUV charging stations, AUVs could travel a limited distance to the next charging station, recharge its batteries, and continue to the next charging station, thus traveling great distances in a relatively short time, similar to the Old West “Pony Express.” One solution is to use temperature differences at various depths in the ocean to produce electricity, which is then stored in a submerged battery. It is preferred to have the upper buoy submerged a reasonable distance below the surface, so as not to be seen from above and not to be inadvertently destroyed by storms or ocean going vessels. In a previous invention, a phase change material (PCM) is melted (expanded) at warm temperatures, for example, 15 °C, and frozen (contracted) at cooler temperatures, for example, 8 °C. Tubes containing the PCM, which could be paraffin such as pentadecane, would be inserted into a container filled with hydraulic oil. When the PCM is melted (expanded), it pushes the oil out into a container that is pressurized to about 3,000 psi (approx equals 20.7 MPa). When a valve is opened, the high-pressure oil passes through a hydraulic motor, which turns a generator and charges a battery. The low-pressure oil is finally reabsorbed into the PCM canister when the PCM tubes are frozen (contracted). Some of the electricity produced could be used to control an external bladder or a motor to the tether line, such that depth cycling is continued for a very long period of time. Alternatively, after the electricity is generated by the hydraulic motor, the exiting low-pressure oil from the hydraulic motor could be vented directly to an external bladder on the AUV, such that filling of the bladder

  8. Elevated-constant pH control assessment at TXU's Comanche peak steam electric station

    International Nuclear Information System (INIS)

    Fellers, B.; Perkins, D.; Bosma, J.; Deshon, J.

    2002-01-01

    Industry experience with axial offset anomaly (AOA) has raised the importance of crud management strategies. Elevated-constant pH control is recognized as one potential solution. Additionally, minimizing radiation fields remains a high industry goal which is supported by this strategy. An investigation of industry experience and experimental data has supported a strategy of constant at-temperature pH of 7.4, requiring as much as 6-ppm lithium at the beginning-of-cycle (BOC). This approach, in a modern high temperature plant with high boron requirements, necessitated a careful assessment of potential risk for increased susceptibility to corrosion for both fuel cladding and RCS structural materials. This paper presents results of the assessment for Comanche peak steam electric station (CPSES) and plans for a demonstration of this practice. (author)

  9. Results of evaluation of periodic safety review for No. 1 plant in Mihama Power Station, Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1994-01-01

    No. 1 plant in Mihama Power Station started the commercial power generation in November, 1970, and has continued the operation for more than 23 years. During this period, the counter measures to troubles, periodic inspections and the maintenance by the electric power company have been carried out. These states of No. 1 plant in Mihama Power Station for more than 23 years are to be recollected from the view-points of the comprehensive evaluation of operation experiences and the reflection of latest technological knowledge, and the safety and reliability are to be further improved in the periodic safety review. Agency of Natural Resources and Energy evaluated the report of the periodic safety review for No. 1 plant in Mihama Power Station made by Kansai Electric Power Co., and summarized the results. The course of the evaluation of the report is shown. The facility utilization factor is 43.3% on the average of about 23 years, but in the last 10 years, it was improved to 69.4%. In the last five years, the rate of occurrence of unexpected shutoff was 0.6 times/year. These are the results of preventive maintenance and the improvement of the facilities and operation management. Operation management, maintenance management, fuel management, radiation control, and radioactive waste management have been carried out properly. The work plan for preventing disasters was established, and the experience of troubles and the latest technological knowledge were well reflected to improve the safety. (K.I.)

  10. Anisotropy in the simultaneous excitation of two colliding atoms to various substate combinations

    International Nuclear Information System (INIS)

    Moorman, L.

    1987-01-01

    In this thesis double-atom excitation (DAE) processes in atomic collision experiments are studied by measuring the angular correlation of two coincident photons emitted by both excited collision particles. The analytical expression for the angular correlation function is derived which contains as adjustable parameters the various (complex) excitation amplitudes integrated over all scattering angles. The He+He system is investigated, for projectile energies between 0.5 and 3.5 keV, in which both particles are excited simultaneously to the 2 1 P state. The relation between photon correlations and atomic state correlations is investigated and the density matrix elements are calculated for a statistical distribution of the excited atomic substates into which a certain symmetry is incorporated. Collisions between metastable and groundstate He atoms are considered. Single-photon spectra are presented and compared with spectra from the He+He collision system. Coincidence measurements were performed on these collision systems to study possible double-atom excitations. Coincidences between two ultraviolet as well as an ultraviolet and a visible photon were measu0515 Also a measurement is reported of the relative population of the magnetic substates of the 3 1 D state of helium. Coincidence measurements on two ultraviolet photons emitted upon Ne-Ne and He-Ne collisions are described and the double-atom excitations for these systems are studied. For Ne+Ne no coincidence peaks were found. For He+Ne double-atom excitation was observed and from the measured angular correlations the corresponding density matrix elements for some kinetic energies of the projectile. (Auth.)

  11. Lifetime management of Magnox power stations

    International Nuclear Information System (INIS)

    Smitton, C.

    1998-01-01

    Magnox Electric, which is, a subsidiary of BNFL, operates six nuclear power plants that have an average age of about 33 years. The procedures developed to maintain the plants and ensure nuclear safety in longer-term operation are reviewed. The technical limit on station lifetimes is expected to be determined by the effect of ageing on major reactor structures where replacement is impractical. Examination of the effect of ageing confirms that the stations are capable of operating to a life of at least 40 years. The economic factors affecting operation are reviewed, recognising the need to sell electricity in a competitive market. Recently Magnox Electric and BNFL have merged and all plant supporting Magnox operations are now within a single integrated company that will provide further opportunities for improved efficiency. (author)

  12. Electric shock and elevated EMF levels due to triplen harmonics

    International Nuclear Information System (INIS)

    Tran, T.Q.; Conrad, L.E.; Stallman, B.K.

    1996-01-01

    The increasing use of single phase rectifiers for electric power conversion in residential applications increases harmonic load on utility systems. Many papers have analyzed the effect of these loads on power quality and equipment loadability. However, there are two more critical concerns for harmonic loads served phase to neutral on multi-grounded wye systems. Triplen harmonics, particularly the third, add in the neutral and have little diversity between loads. The higher neutral currents may cause significant problems. Neutral to earth voltages will increase near the substations which could increase stray voltage complaints. The additional neutral current on three phase lines will elevate EMF levels especially in the fringe areas. This paper provides fundamental understanding of triplen harmonic influence on stray voltage and EMF related to multi-grounded wye electric distribution systems

  13. Acquisition of wood fuel at the Joseph C. McNeil Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Kropelin, W. [Burlington Electric Dept., VT (United States)

    1993-12-31

    The Joseph C. McNeil Generating Station is the world`s largest single boiler, municipally-owned, wood-fired electrical generating plant. The 50 megawatt McNeil Station is located in Burlington, Vermont and is owned by several Vermont public and private electric utilities. The operator and majority owner is the City of Burlington Electric Department (BED). Wood fuel procurement for the McNeil Station has been conducted in an environmentally sensitive way. Harvesting is carried out in conformance with a comprehensive wood chip harvesting policy and monitored by professional foresters. Unpredictable levels of Station operation require rigid adherence to a wood storage plan that minimizes the risk of over heating and spontaneous combustion of stockpiled fuel.

  14. NRC's object-oriented simulator instructor station

    International Nuclear Information System (INIS)

    Griffin, J.I.; Griffin, J.P.

    1995-06-01

    As part of a comprehensive simulator upgrade program, the simulator computer systems associated with the Nuclear Regulatory Commission's (NRC) nuclear power plant simulators were replaced. Because the original instructor stations for two of the simulators were dependent on the original computer equipment, it was necessary to develop and implement new instructor stations. This report describes the Macintosh-based Instructor Stations developed by NRC engineers for the General Electric (GE) and Babcock and Wilcox (B and W) simulators

  15. Wind Energy Based Electric Vehicle Charging Stations Sitting. A GIS/Wind Resource Assessment Approach

    Directory of Open Access Journals (Sweden)

    George Xydis

    2015-11-01

    Full Text Available The transportation sector is severely correlated with major problems in environment, citizens’ health, climate and economy. Issues such as traffic, fuel cost and parking space have make life more difficult, especially in the dense urban environment. Thus, there is a great need for the development of the electric vehicle (EV sector. The number of cars in cities has increased so much that the current transportation system (roads, parking places, traffic lights, etc. cannot accommodate them properly. The increasing number of vehicles does not affect only humans but also the environment, through air and noise pollution. According to EPA, the 39.2% of total gas emissions in 2007 was caused by transportation activities. Studies have shown that the pollutants are not only gathered in the major roads and/or highways but can travel depending on the meteorological conditions leading to generic pollution. The promotion of EVs and the charging stations are both equally required to be further developed in order EVs to move out of the cities and finally confront the range problem. In this work, a wind resource and a GIS analysis optimizes in a wider area the sitting of wind based charging stations and proposes an optimizing methodology.

  16. Optimization and Economic Analysis of Grid-Photovoltaic Electric Boat Charging Station in Kuala Terengganu

    Directory of Open Access Journals (Sweden)

    Salleh N.A. S.

    2016-01-01

    Full Text Available This study evaluates the feasibility of developing grid-photovoltaic electric boat charging station in Kuala Terengganu using simulation-based method. The main focus is on reducing the dependency on subsidy spent by the government in fisheries sector and encouraging green technology in commercial sector. All data such as solar radiation, amount of subsidy received by fishermen, and fishing activities were collected for the selected area. Economic analyses of the proposed system are discussed based on payback period and net present cost (NPC. The comparison between the proposed system and the grid-only system is done based on the production and consumption of electricity per year, the NPC and emission of pollutant. The system also generates high income from selling energy to the grid with tariff rates RM 1.49/kWh. It is concluded that the proposed system is feasible to be developed in the selected area with the payback period and the NPC are 8.2 years and RM 759,098, respectively. The results also show that the performance of the proposed system is better than grid-only system in all the interested parameters.

  17. 76 FR 29261 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Campo Wind Energy...

    Science.gov (United States)

    2011-05-20

    ... concrete foundation. Turbines would be connected by underground electrical cable to a project substation... transformer and switching equipment and an area for vehicle parking. Up to 5 miles of new 3-phase 138 kV... the project collector substation to a San Diego Gas & Electric (SDG&E) switchyard. The SDG&E...

  18. Advanced approach for determination of earthing characteristics of high voltage substations in terms of their optimal protection from lightning strike

    International Nuclear Information System (INIS)

    Talevski, Vladimir

    2012-01-01

    At the beginning of this PhD thesis, retrospective history is given concerning the evolution of the methods for lightning protection. The conventional methods are presented concerning lighting protection, with a comparation with the newest achievement on this field. The process of thundercloud formation is presented. The foundation of the conventional method for lightning protection is given, using data from standard IEC 62305, made according Berger research documents [10], [47], [53].The basic of the 'charge transfer system' is presented, developed by Carpenter, and in addition to this theory is the recently published theory of Rizk and his conditions of not initiating an upward leader for an object that is protected by lightning strike. Also it is high-voltage substation according to [52] and [54]. In this PhD thesis, a method for computation of additional positive charge is established for protection against direct lightning strike by the charge transfer system, which is generated over spherical electrode (ionizator) in order to get 'ultra-corona' mode, condition in which the corona current over the ionizator is not generating an upward leader. The ionizator in this computation is concerned with constant radius of curvature. The influence of the voltage increase in a very small time interval is computed and this influence is concerned in the computation of the additional space charge on the object to be protected, according to Rizk [1]. The model of the electrical thundercloud is concerned with all the electrical charge in it with its corresponding heights above ground. At the end , the condition of having minimal electrostatic field at earth is used to get the result for the additional positive charge. The computation is established by special function in Matlab, which are programmed in order to simulate a large number of values for: the electrical model of the thundercloud (positive and negative charges in thundercloud and their respective height above ground

  19. Pumped energy transfer stations (STEP)

    International Nuclear Information System (INIS)

    Tournery, Jean-Francois

    2015-12-01

    As objectives of development are high for renewable energies (they are supposed to cover 50 per cent of new energy needs by 2035), pumped energy transfer stations are to play an important role in this respect. The author first discusses the consequences of the development of renewable energies on the exploitation of electric grids: issue of intermittency for some of them, envisaged solutions. Then, he addresses one of the solutions: the storage of electric power. He notices that increasing the potential energy of a volume of water is presently the most mature solution to face massive needs of the power system. Dams and pumped energy transfer stations represent now almost the whole installed storage power in the world. The author then presents these pumped energy transfer stations: principle, brief history (the first appeared in Italy and Switzerland at the end of the 1890's). He indicates the various parameters of assessment of such stations: maximum stored energy, installed power in pumping mode and turbine mode, time constant, efficiency, level of flexibility. He discusses economic issues. He describes and comments the operation of turbine-pump groups: ternary groups, reversible binary groups. He discusses barriers to be overcome and technical advances to be made for varying speed groups and for marine stations. He finally gives an overview (table with number of stations belonging to different power ranges, remarkable installations) of existing stations in China, USA, Japan, Germany, Austria, Spain, Portugal, Italy, Switzerland, France and UK, and indicate predictions regarding storage needs at the world level. Some data are finally indicated for the six existing French installations

  20. Experience gained in the operation of the Beznau nuclear power station

    International Nuclear Information System (INIS)

    Kueffer, K. von.

    1976-01-01

    The 24th December 1969, when the Beznau 1 nuclear power station was placed in commercial operation, marked the beginning of electricity production from nuclear energy in Switzerland. Beznau 2 followed on the 15th March 1972. Together with the Muehleberg nuclear power station, nuclear energy accounts for approximately 20 percent of the total electricity production in Switzerland. Until the end of 1975, Switzerland's three nuclear power stations had a mean energy utilisation factor of 71.3 percent which, as compared with a mean energy utilization factor of 60.5 percent for all the nuclear power stations in the West, suggests fairly good operational results. Problems that arose during operation are discussed in detail. By way of summary it is stated that the operation of the Beznau nuclear power station has so far proved a success. The production of electrical energy has always remained within the limits imposed by the law and by the safety aspects. (Auth.)

  1. Power station instrumentation

    International Nuclear Information System (INIS)

    Jervis, M.W.

    1993-01-01

    Power stations are characterized by a wide variety of mechanical and electrical plant operating with structures, liquids and gases working at high pressures and temperatures and with large mass flows. The voltages and currents are also the highest that occur in most industries. In order to achieve maximum economy, the plant is operated with relatively small margins from conditions that can cause rapid plant damage, safety implications, and very high financial penalties. In common with other process industries, power stations depend heavily on control and instrumentation. These systems have become particularly significant, in the cost-conscious privatized environment, for providing the means to implement the automation implicit in maintaining safety standards, improving generation efficiency and reducing operating manpower costs. This book is for professional instrumentation engineers who need to known about their use in power stations and power station engineers requiring information about the principles and choice of instrumentation available. There are 8 chapters; chapter 4 on instrumentation for nuclear steam supply systems is indexed separately. (Author)

  2. On the complex analysis of the reliability, safety, and economic efficiency of atomic electric power stations

    International Nuclear Information System (INIS)

    Emel'yanov, I.Ya.; Klemin, A.I.; Polyakov, E.F.

    1977-01-01

    The problem is posed of effectively increasing the engineering performance of nuclear electric power stations (APS). The principal components of the engineering performance of modern large APS are considered: economic efficiency, radiation safety, reliability, and their interrelationship. A nomenclature is proposed for the quantitative indices which most completely characterize the enumerated properties and are convenient for the analysis of the engineering performance. The urgent problem of developing a methodology for the complex analysis and optimization of the principal performance components is considered; this methodology is designed to increase the efficiency of the work on high-performance competitive APS. The principle of complex optimization of the reliability, safety, and economic-efficiency indices is formulated; specific recommendations are made for the practical realization of this principle. The structure of the complex quantiative analysis of the enumerated performance components is given. The urgency and promise of the complex approach to solving the problem of APS optimization is demonstrated, i.e., the solution of the problem of creating optimally reliable, fairly safe, and maximally economically efficient stations

  3. Training of engineers for nuclear power station operation

    International Nuclear Information System (INIS)

    Myerscough, P.B.

    1980-01-01

    The requirements for staffing and training of a nuclear electric utility are described. Current training facilities at the Central Electricity Generating Board are applicable to gas-cooled technology with the possibility of the introduction of a thermal water system and fast reactors in the future. The CEGB training centres provide for the initial training of operational staff, revision training of experienced operational staff, and training of non-operational staff from the stations and supporting departments. Details are given of the content of the training courses which also provide simulation facilities of the basic dynamics of the CEGB stations. Further developments in simulation will include dynamics of the boiler and turbine plants in Magnox stations. The flexibility of the AGR simulations will enable the training exercises to be adjusted to meet changing operating patterns for each AGR station. (U.K.)

  4. MHD power station with coal gasification

    International Nuclear Information System (INIS)

    Brzozowski, W.S.; Dul, J.; Pudlik, W.

    1976-01-01

    A description is given of the proposed operating method of a MHD-power station including a complete coal gasification into lean gas with a simultaneous partial gas production for the use of outside consumers. A comparison with coal gasification methods actually being used and full capabilities of power stations heated with coal-derived gas shows distinct advantages resulting from applying the method of coal gasification with waste heat from MHD generators working within the boundaries of the thermal-electric power station. (author)

  5. Intake-to-delivered-energy ratios for central station and distributed electricity generation in California

    International Nuclear Information System (INIS)

    Heath, Garvin A.; Nazaroff, William W.

    2007-01-01

    In previous work, we showed that the intake fraction (iF) for nonreactive primary air pollutants was 20 times higher in central tendency for small-scale, urban-sited distributed electricity generation (DG) sources than for large-scale, central station (CS) power plants in California [Heath, G.A., Granvold, P.W., Hoats, A.S., Nazaroff, W.W., 2006. Intake fraction assessment of the air pollutant exposure implications of a shift toward distributed electricity generation. Atmospheric Environment 40, 7164-7177]. The present paper builds on that study, exploring pollutant- and technology-specific aspects of population inhalation exposure from electricity generation. We compare California's existing CS-based system to one that is more reliant on DG units sited in urban areas. We use Gaussian plume modeling and a GIS-based exposure analysis to assess 25 existing CSs and 11 DG sources hypothetically located in the downtowns of California's most populous cities. We consider population intake of three pollutants - PM 2.5 , NO x and formaldehyde - directly emitted by five DG technologies - natural gas (NG)-fired turbines, NG internal combustion engines (ICE), NG microturbines, diesel ICEs, and fuel cells with on-site NG reformers. We also consider intake of these pollutants from existing CS facilities, most of which use large NG turbines, as well as from hypothetical facilities located at these same sites but meeting California's best-available control technology standards. After systematically exploring the sensitivity of iF to pollutant decay rate, the iFs for each of the three pollutants for all DG and CS cases are estimated. To efficiently compare the pollutant- and technology-specific exposure potential on an appropriate common basis, a new metric is introduced and evaluated: the intake-to-delivered-energy ratio (IDER). The IDER expresses the mass of pollutant inhaled by an exposed population owing to emissions from an electricity generation unit per quantity of electric

  6. Intake-to-delivered-energy ratios for central station and distributed electricity generation in California

    Science.gov (United States)

    Heath, Garvin A.; Nazaroff, William W.

    In previous work, we showed that the intake fraction (iF) for nonreactive primary air pollutants was 20 times higher in central tendency for small-scale, urban-sited distributed electricity generation (DG) sources than for large-scale, central station (CS) power plants in California [Heath, G.A., Granvold, P.W., Hoats, A.S., Nazaroff, W.W., 2006. Intake fraction assessment of the air pollutant exposure implications of a shift toward distributed electricity generation. Atmospheric Environment 40, 7164-7177]. The present paper builds on that study, exploring pollutant- and technology-specific aspects of population inhalation exposure from electricity generation. We compare California's existing CS-based system to one that is more reliant on DG units sited in urban areas. We use Gaussian plume modeling and a GIS-based exposure analysis to assess 25 existing CSs and 11 DG sources hypothetically located in the downtowns of California's most populous cities. We consider population intake of three pollutants—PM 2.5, NO x and formaldehyde—directly emitted by five DG technologies—natural gas (NG)-fired turbines, NG internal combustion engines (ICE), NG microturbines, diesel ICEs, and fuel cells with on-site NG reformers. We also consider intake of these pollutants from existing CS facilities, most of which use large NG turbines, as well as from hypothetical facilities located at these same sites but meeting California's best-available control technology standards. After systematically exploring the sensitivity of iF to pollutant decay rate, the iFs for each of the three pollutants for all DG and CS cases are estimated. To efficiently compare the pollutant- and technology-specific exposure potential on an appropriate common basis, a new metric is introduced and evaluated: the intake-to-delivered-energy ratio (IDER). The IDER expresses the mass of pollutant inhaled by an exposed population owing to emissions from an electricity generation unit per quantity of electric

  7. The electrical system of nuclear power plant

    International Nuclear Information System (INIS)

    Firman Silitonga; Gunarwan Prayitno

    2009-01-01

    In these system, electrical power system is supplied from two-offsite transmission system respective main transformer and house service transformer; and reserve transformer. The electrical load in these system consist of safety electrical system and non-safety electrical system, The safety electrical and non safety electrical systems consist of four 6,9 kV AC medium voltage bus and 480 V AC low voltage bus system. The DC power system consist of four safety 125 V DC power system and the two non-safety 125 DC power systems. The equipment in these electrical system is main turbine-generator; GTG safety; GTG alternate; uninterrupted power supply (UPS) and battery system. To protect electrical equipment and building to direct stroke and non direct stroke disturbances is installed netral grounding system and lightning protection and protection the personnel to touch-voltage is installed equipment grounding system and station grounding. The lightning arrester system is connected to station station grounding system. (author)

  8. Adaptive Modeling of the International Space Station Electrical Power System

    Science.gov (United States)

    Thomas, Justin Ray

    2007-01-01

    Software simulations provide NASA engineers the ability to experiment with spacecraft systems in a computer-imitated environment. Engineers currently develop software models that encapsulate spacecraft system behavior. These models can be inaccurate due to invalid assumptions, erroneous operation, or system evolution. Increasing accuracy requires manual calibration and domain-specific knowledge. This thesis presents a method for automatically learning system models without any assumptions regarding system behavior. Data stream mining techniques are applied to learn models for critical portions of the International Space Station (ISS) Electrical Power System (EPS). We also explore a knowledge fusion approach that uses traditional engineered EPS models to supplement the learned models. We observed that these engineered EPS models provide useful background knowledge to reduce predictive error spikes when confronted with making predictions in situations that are quite different from the training scenarios used when learning the model. Evaluations using ISS sensor data and existing EPS models demonstrate the success of the adaptive approach. Our experimental results show that adaptive modeling provides reductions in model error anywhere from 80% to 96% over these existing models. Final discussions include impending use of adaptive modeling technology for ISS mission operations and the need for adaptive modeling in future NASA lunar and Martian exploration.

  9. Control and digital supervision of sub-stations

    International Nuclear Information System (INIS)

    Martin, O; Messie, M; Labrouche, G. de la

    1996-01-01

    The article is about the electromagnetic compatibility, security of the operation, requirements evolution and techniques among other aspects. It concludes that the dynamics of the progress associated with digital technologies should therefore, to control by means of a rational development that requires of tools and methods that are at the same time with the technological and economic jump, the jump should also be cultural concerning the coming of a new field of knowledge, the prosecution of data

  10. Electric power development in the USSR

    International Nuclear Information System (INIS)

    Rudenko, Y.N.

    1993-01-01

    The generation of electric power in the USSR is based on the Unified Electric Power System (UEPS) whose network cover most of the habitable territory of the country. Therefore, the development of the UEPS governs the overall evolution of the electric power generation in the country. At present, eleven out of thirteen joint electric power systems, which supply electricity to most of the USSR, are operating within the UEPS. The total electric power generation in the country reached 1728 billion kWh in 1990, of which the UEPS supplied approximately 90%. About 70% of installed capacity of the UEPS is fossil-fuelled power plants, about 12 % is nuclear power plants, and about 18% is hydroelectric power plants. The system-forming grid of the UEPS is made up of transmission lines of 220, 330, 500 and 750 kV. The on-line supervisory control of the UEPS is achieved by four-level automated system of dispatch control (UEPS, joint electric power systems, regional electric power systems, electric power plants, substations,electric grid regions). The development and extension of the UEPS in the USSR ensure higher reliability and quality of electric power supply to end-users, combined with higher efficiency. The principal problem facing the UEPS are as follows: the need to ensure environmental protection and efficiency of the steam power plants; to improve the safety and efficiency of nuclear power plants. The solution to these problems will define the conditions of the UEPS development, as well as electric power systems of other countries, at least for the coming two decades. This paper characterizes the peculiarities of the UEPS development over the last 20 years, including the installed capacity structure and the system-forming electric power grid. Special attention is paid to the environmental problems related to functioning and development of the UEPS and to the means of their solution. (author)

  11. SYNCHRONIZATION OF NATIONAL GRID NETWORK WITH THE ELECTRICITY SHIPS NETWORK IN THE "SHORE TO SHIP" SYSTEM

    Directory of Open Access Journals (Sweden)

    Dariusz TARNAPOWICZ

    2013-07-01

    Full Text Available ‘Shore to ship’ system – ships’ power supply from the local electrical substations – is one of the effective ways to limit the negative impact of the ships lying in ports on the environment. Energy infrastructure of the port installation necessary to provide ships with power supply has to be designed so that different types of ships can use it. The important issue concerning ‘shore to ship’ system is the quality of power supply. This can be achieved via sustaining continuity of power supply while switching from the ships’ electrical network over to the national grid. In this article the author presents the way of synchronizing the national grid with the ships’ electrical network during ship’s lying in port. Such synchronization would allow for uninterruptible work of the ship’s electrical devices.

  12. Comparison of the economy of atomic power stations and fossil-fuel power stations under Danish conditions

    International Nuclear Information System (INIS)

    Daub, J.

    1977-06-01

    The report deals with the investment and financing aspects of extending the Danish electricity production system with central, base-load power stations. Technical and economic data for the plants are determined on the basis of an analysis of the information presently available. A description is given of the general problems connected with analysis of investment and finance relevant to power station expansion. Comparative calculations are given for alternative methods of expansion comprising a few stations to be put into operation in 1987 and for other alternative expansions that cover the period until 2000 as regards costs. For use in economic comparisons with a few plants, a new calculation method was developed that takes into account possible differences in the value of the plants in the electricity production system. This method is described in appendix 1. In a further two appendices are given the technical reasons for using, respectively, the present-value method in the investment analyses and the reserve power philosophy applied in the main report. (author)

  13. Optimization of Mangala Hydropower Station, Pakistan, using Optimization Techniques

    Directory of Open Access Journals (Sweden)

    Zaman Muhammad

    2017-01-01

    Full Text Available Hydropower generation is one of the key element in the economy of a country. The present study focusses on the optimal electricity generation from the Mangla reservoir in Pakistan. A mathematical model has been developed for the Mangla hydropower station and particle swarm and genetic algorithm optimization techniques were applied at this model for optimal electricity generation. Results revealed that electricity production increases with the application of optimization techniques at the proposed mathematical model. Genetic Algorithm can produce maximum electricity than Particle swarm optimization but the time of execution of particle swarm optimization is much lesser than the Genetic algorithm. Mangla hydropower station can produce up to 59*109 kWh electricity by using the flows optimally than 47*108 kWh production from traditional methods.

  14. First operation experiences from a 30 kV 104 MVA HTS power cable installed in a utility substation

    DEFF Research Database (Denmark)

    Willen, D.; Hansen, F.; Daumling, M.

    2002-01-01

    realistic conditions in the substation of Amager (AMK). Approximately 50 000 private and business customers are supplied from this cable. The load can be adjusted from 20% to 100% of the power supplied and the number of branches connected can be altered. This and other early HTS power installations...... are expected to act as ice-breakers for the HTS technology...

  15. The economic feasibility of renewable powered fast charging stations

    Energy Technology Data Exchange (ETDEWEB)

    Benger, Ralf; Heyne, Raoul; Wenzl, Heinz; Beck, Hans-Peter

    2011-07-01

    Electric vehicles will make an important contribution for a sustainable energy supply in the public transport sector. Although it is not sure at the moment which role the different vehicle concepts and charging options will play, it is possible to act on following assumptions: There will be purely electrically operated vehicles (EV), which will need a charging infrastructure in the public domain. Even if the number of these vehicles in comparison with hybrid electric vehicles (HEV) or range extended electric vehicles (REV) will be low, in the long run an amount of some million vehicles can be reached (1 0 % of the vehicles in Germany corresponds to round about 4 million vehicles). Charging stations in parking areas, shopping malls, at home or at work do not require high charging power because the time available for charging is relative long. In contrast charging stations beside these in normal parking areas should have the ability to charge the car batteries in a very short time, e.g. 80% of the energy content in 15 minutes or less. Therefore every charging process requires 100-200 kW electric power. Such charging stations are necessary both in rural and in urban regions.

  16. Centralized vs. decentralized nursing stations: effects on nurses' functional use of space and work environment.

    Science.gov (United States)

    Zborowsky, Terri; Bunker-Hellmich, Lou; Morelli, Agneta; O'Neill, Mike

    2010-01-01

    Evidence-based findings of the effects of nursing station design on nurses' work environment and work behavior are essential to improve conditions and increase retention among these fundamental members of the healthcare delivery team. The purpose of this exploratory study was to investigate how nursing station design (i.e., centralized and decentralized nursing station layouts) affected nurses' use of space, patient visibility, noise levels, and perceptions of the work environment. Advances in information technology have enabled nurses to move away from traditional centralized paper-charting stations to smaller decentralized work stations and charting substations located closer to, or inside of, patient rooms. Improved understanding of the trade-offs presented by centralized and decentralized nursing station design has the potential to provide useful information for future nursing station layouts. This information will be critical for understanding the nurse environment "fit." The study used an exploratory design with both qualitative and quantitative methods. Qualitative data regarding the effects of nursing station design on nurses' health and work environment were gathered by means of focus group interviews. Quantitative data-gathering techniques included place- and person-centered space use observations, patient visibility assessments, sound level measurements, and an online questionnaire regarding perceptions of the work environment. Nurses on all units were observed most frequently performing telephone, computer, and administrative duties. Time spent using telephones, computers, and performing other administrative duties was significantly higher in the centralized nursing stations. Consultations with medical staff and social interactions were significantly less frequent in decentralized nursing stations. There were no indications that either centralized or decentralized nursing station designs resulted in superior visibility. Sound levels measured in all

  17. Techno-economic and sensitivity analysis for grid-connected renewable energy electric boat charging station in Terengganu

    Directory of Open Access Journals (Sweden)

    Salleh N. A. S.

    2017-01-01

    Full Text Available In order to encourage the eco-friendly technologies in transportation sector, the reliance on fuel need to be reduced and the use of renewable energy (RE technology as energy source are widely explored by researchers. Thus, this study focus on the feasibility of developing grid-connected renewable energy electric boat charging station for the fishermen in Terengganu using simulation-based method by HOMER software. Five year solar radiation and wind speed data were collected at Universiti Sultan Zainal Abidin (UNISZA weather station. For load profile, the information about fishing activities and the amount of subsidy spent by the government were obtained from the interview session with the fishermen and validated with Lembaga Kemajuan Ikan Malaysia (LKIM. The results acquired are compared between grid-only and grid-connected RE systems in term of net present cost (NPC, operational cost and payback period. A sensitivity analysis is done to find the minimal Feed-in Tariff (FiT rate that can be implemented in order to encourage the use of RE system in this sector. Then, the relationship between FiT and NPC, payback period and emission of pollutants are analyzed. At current FiT rates RM 0.813/kWh, hybrid grid-PV system manages to achieve its optimal in generating high income from selling the power to the grid with convincing amount of electricity production and short payback period. It is concluded at minimum RM 0.56/kWh of FiT, the grid-connected RE system is possible to be developed because its performance shows better outcome compared to the grid-only system.

  18. Shippingport station communications program

    International Nuclear Information System (INIS)

    Stote, J.J.

    1988-01-01

    The author discusses how the communications program for the Shippingport Atomic Power Station has a long history. It can be traced as far back as 1953, when the U.S. Atomic Energy Commission (AEC) awarded a contract to Westinghouse Electric to design the nuclear portion of a power plant for electric utility use. During May of the next year, President Eisenhower initiated groundbreaking ceremonies for the construction of the commercial atomic power plant at Shippingport, Pennsylvania

  19. Elf measurements in Greece conducted by the Greek Atomic Energy Commission

    International Nuclear Information System (INIS)

    Karabetsos, E.; Filippopoulos, G.; Koutounidis, D.; Govari, Ch.; Skamnakis, N.

    2006-01-01

    The Greek Atomic Energy Commission (E.E.A.E.) is the competent national authority for the protection of the general public and the environment from artificially produced non-ionizing radiation. To this end, E.E.A.E. carries out measurements in the vicinity of all kinds of facilities emitting E.L.F. electric and magnetic fields (e.g. power lines, high voltage substations) and RF electromagnetic fields (e.g. audio, radio and television antennas, mobile phone base stations, radar and satellite earth stations and other microwave communication systems), in order to monitor whether the general public exposure limits are being adhered to. Regarding the electromagnetic fields emitted by antenna stations, the safety limits in Greek legislation were recently set to 70% of the I.C.N.I.R.P. values and to 60% of them if the antenna station is closer than 300 m from the perimeter of day nurseries, schools, hospitals or elder-care facilities, while in the case of extremely low frequency fields, the limit values are set exactly the same as the reference levels in I.C.N.I.R.P. guidelines. Regarding the levels of E.L.F. electric and magnetic fields in Greece E.E.A.E. has conducted many measurements around the elements of the electric grid where the main interest of the public is focused. Theoretical estimations and typical values based on actual measurements of the fields in the vicinity of the power lines used in Greece are presented. Measurement results in the vicinity of substations are also presented. In general, the levels of the magnetic field in the vicinity of the power grid elements are well below the established safety limits; whereas the levels of the electric field may reach values comparable to the safety limits very close to extremely high voltage lines. However, there is no case where the measured values of elf electric or magnetic fields were higher than the safety limits. There are a few exceptional cases where measurements of RF fields conducted by E.E.A.E. in the

  20. Elf measurements in Greece conducted by the Greek Atomic Energy Commission

    Energy Technology Data Exchange (ETDEWEB)

    Karabetsos, E.; Filippopoulos, G.; Koutounidis, D.; Govari, Ch.; Skamnakis, N. [Greek Atomic Energy Commission, Non Ionizing Radiation Office, (Greece)

    2006-07-01

    The Greek Atomic Energy Commission (E.E.A.E.) is the competent national authority for the protection of the general public and the environment from artificially produced non-ionizing radiation. To this end, E.E.A.E. carries out measurements in the vicinity of all kinds of facilities emitting E.L.F. electric and magnetic fields (e.g. power lines, high voltage substations) and RF electromagnetic fields (e.g. audio, radio and television antennas, mobile phone base stations, radar and satellite earth stations and other microwave communication systems), in order to monitor whether the general public exposure limits are being adhered to. Regarding the electromagnetic fields emitted by antenna stations, the safety limits in Greek legislation were recently set to 70% of the I.C.N.I.R.P. values and to 60% of them if the antenna station is closer than 300 m from the perimeter of day nurseries, schools, hospitals or elder-care facilities, while in the case of extremely low frequency fields, the limit values are set exactly the same as the reference levels in I.C.N.I.R.P. guidelines. Regarding the levels of E.L.F. electric and magnetic fields in Greece E.E.A.E. has conducted many measurements around the elements of the electric grid where the main interest of the public is focused. Theoretical estimations and typical values based on actual measurements of the fields in the vicinity of the power lines used in Greece are presented. Measurement results in the vicinity of substations are also presented. In general, the levels of the magnetic field in the vicinity of the power grid elements are well below the established safety limits; whereas the levels of the electric field may reach values comparable to the safety limits very close to extremely high voltage lines. However, there is no case where the measured values of elf electric or magnetic fields were higher than the safety limits. There are a few exceptional cases where measurements of RF fields conducted by E.E.A.E. in the

  1. Construction of Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Yamanari, Shozo; Miyahara, Ryohei; Umezawa, Takeshi; Teshiba, Ichiro

    2006-01-01

    Construction of the Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc. (advanced boiling-water reactor; output: 1.358 mega watts) was begun in August 1999 and it will resume commercial operation in March 2006 as scheduled. Hitachi contributed effectually toward realizing the project with supply of a complete set of the advanced nuclear reactor and turbine-generator system with the latest design and construction technology in harmony. Large-scale modular structures for installation and a computer-aided engineering system for work procedure and schedule management were applied with the utmost priority placed on work efficiency, safety and quality assurance. (T.Tanaka)

  2. Load flow analysis for determining the location of NPP power distribution in West Kalimantan

    International Nuclear Information System (INIS)

    Citra Candranurani; Rizki Finnansyah Setya Budi; Sahala M Lumbanraja

    2015-01-01

    Electricity crisis condition happened in West Kalimantan (Kalbar) as a result of power plant capacity almost equal to the peak load. The system will experience a shortfall if there are plants that not operating and do not have reserve. The policy of electricity planning until 2022 is replacing diesel power plant with steam power plant. For long-term planning is required the role of new and renewable energy in order to reduce dependency on fossil fuel consumption, such as NPP utilization. The purpose of this study was to determine the optimum location of the NPP power distribution in order to prepare electricity infrastructure. Load flow calculation in this study using ETAP 12.5 software. NPP is planned to supply base load, so the optimum capacity factor is above 80 %. The result show that there are three location where NPP can generate over 80 % of its capacity, namely: Mempawah Substation, Singkawang Substation, and Sambas Substation. The most optimum located in Mempawah Substation with capacity factor 83.5 %. The location of the three Substation are onshore and in line with one requirement for NPP construction, namely: the availability of cooling water. (author)

  3. THE CALCULATION OF THE ENERGY RECOVERY ELECTRIFIED URBAN TRANSPORT DURING THE INSTALLATION DRIVE FOR TRACTION SUBSTATION

    Directory of Open Access Journals (Sweden)

    A. A. Sulim

    2014-01-01

    Full Text Available At present a great attention is paid to increasing of energy efficiency at operated electrified urban transport. Perspective direction for increasing energy efficiency at that type of transport is the application of regenerative braking. For additional increasing of energy efficiency there were suggested the use of capacitive drive on tires of traction substation. One of the main task is the analysis of energy recovery application  with drive and without it.These analysis demonstrated that the calculation algorithms don’t allow in the full volume to carry out calculations of amount and cost of energy recovery without drive and with it. That is why we see the current interest to this topic. The purpose of work is to create methods of algorithms calculation for definite amount and cost of consumed, redundant and recovery energy of electrified urban transport due to definite regime of motion on wayside. There is algorithm developed, which allow to calculate amount and cost of consumed, redundant and recovery energy of electrified urban transport on wayside during the installation capacitive drive at traction substation. On the basis of developed algorithm for the definite regime of wagon motion of subway there were fulfilled the example of energy recovery amount and its cost calculation, among them with limited energy intensity drive, when there are 4 trains on wayside simultaneously.

  4. Power stations

    International Nuclear Information System (INIS)

    Cawte, H.; Philpott, E.F.

    1980-01-01

    The object is to provide a method of operating a dual purpose power station so that the steam supply system is operated at a high load factor. The available steam not required for electricity generation is used to provide process heat and the new feature is that the process plant capacity is determined to make the most economic use of the steam supply system, and not to match the passout capacity of the turbine of the turbogenerator. The product of the process plant should, therefore, be capable of being stored. A dual-purpose power station with a nuclear-powered steam source, turbogenerating means connected to the steam source and steam-powered process plant susceptible to wide variation in its rate of operation is described. (U.K.)

  5. Technical evaluation report on the adequacy of station electric distribution system voltages for the Point Beach Nuclear Plant, Units 1 and 2. (Docket Nos. 50-266, 50-301)

    International Nuclear Information System (INIS)

    White, R.L.

    1983-01-01

    This report documents the technical evaluation of the adequacy of the station electric distribution system voltages for the Point Beach Nuclear Plant, Units 1 and 2. The evaluation is to determine if the onsite distribution system, in conjunction with the offsite power sources, has sufficient capacity to automatically start and operate all Class 1E loads within the equipment voltage ratings under certain conditions established by the Nuclear Regulatory Commission. For the worst case conditions study submitted by the licensee, it was shown that the station electric distribution system voltages would be adequate to start and operate 4160-volt and 480-volt Class 1E loads and their associated low voltage controls

  6. Gas expanders at M/R Stations in the natural gas distribution network. Pre-project, subreport; Gasexpandere paa distributionsnettets M/R-stationer. Forprojekt, delrapport

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, Niels Bjarne

    2010-05-15

    Danish Gas Technology Centre has been carrying out a feasibility project to clarify the possibilities of installing gas expanders at M/R-stations (Measuring and Regulating) in the Distribution system of the natural gas grid. A large number of such expanders are installed around the world. The novelty of this project is to use a heat pump to perform the necessary heating of the gas before the expander, and to ''export'' to the electricity grid the remaining electricity from the generator connected to the expander. The present project includes the small M/R-stations at the gas Distribution grid where pressure is reduced from 40 or 20 bar to 4 bar. The preliminary project (year 1 of project) has investigated whether components for such smaller systems can be found, and it has investigated prices for different quantities. A technical feasibility study has been done. Also, preliminary calculations of payback times has been carried out. A large potential of CO{sub 2}-reduction is present with this technology based on saving of natural gas combustion and on new electricity production displacing existing production without any use of primary energy. The main results and conclusions are: 1) There are component suppliers for expander systems suitable to the size of distribution network M/R stations. 2) Pressure regulators provided at the stations are laid out with significant overcapacity, enabling a simplified installation of the expander systems. 3) If the system is being rolled out across the Danish distribution grid, the realistic saving potential is approx. 2.3 million Nm3 of gas per year and a production of almost 40 million kWh of electricity. 4) If the price is 0.60 DKK/kWh for electricity sold, the simple pay-back is 6-7 years on average, covering a variation from 3 to 16 years at the various stations. The smallest stations are omitted. The best stations covering more than half of the gas flow have a pay-back time between 3 and 6 years. 5) The

  7. Interim report on the accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    2011-12-01

    The Investigation Committee on the Accident at the Fukushima Nuclear Power Stations (the Investigation Committee) of Tokyo Electric Power Company (TEPCO) was established by the Cabinet decision on May 24, 2011. Its objectives are: to conduct investigation for finding out the causes of accidents at the Fukushima Dai-ichi Nuclear Power Station (Fukushima Dai-ichi NPS) and Fukushima Dai-ni Nuclear Power Station (Fukushima Dai-ni NPS) of TEPCO as well as the causes of accident damage; and to make policy recommendations for limiting the expansion of damage and preventing reoccurrence of similar accidents. The Investigation Committee has conducted its investigation and evaluation since its first meeting on June 7, 2011. Its activities included: site visits to the Fukushima Dai-ichi and Dai-ni NPSs, as well as to other facilities; hearing of heads of local governments around the Fukushima Dai-ichi NPS; and hearing of people concerned through interviews mainly arranged by the Secretariat. As of December 16, 2011, the number of interviewees reached 456. The investigation and evaluation by the Investigation Committee are still ongoing and the Interim Report does not cover every item that the Committee aims at investigating and evaluating. Fact-finding of even some of those items discussed in the Interim Report are not yet completed. The Investigation Committee continues to conduct its investigation and evaluation and will issue its Final Report in the summer of 2012. This brief executive summary covers mainly considerations and evaluation of the issues in Chapter VII of the Interim Report, with brief reference to Chapters I to VI. The Investigation Committee recommendations are printed in bold. (author)

  8. Optimal Coordinated Management of a Plug-In Electric Vehicle Charging Station under a Flexible Penalty Contract for Voltage Security

    Directory of Open Access Journals (Sweden)

    Jip Kim

    2016-07-01

    Full Text Available The increasing penetration of plug-in electric vehicles (PEVs may cause a low-voltage problem in the distribution network. In particular, the introduction of charging stations where multiple PEVs are simultaneously charged at the same bus can aggravate the low-voltage problem. Unlike a distribution network operator (DNO who has the overall responsibility for stable and reliable network operation, a charging station operator (CSO may schedule PEV charging without consideration for the resulting severe voltage drop. Therefore, there is a need for the DNO to impose a coordination measure to induce the CSO to adjust its charging schedule to help mitigate the voltage problem. Although the current time-of-use (TOU tariff is an indirect coordination measure that can motivate the CSO to shift its charging demand to off-peak time by imposing a high rate at the peak time, it is limited by its rigidity in that the network voltage condition cannot be flexibly reflected in the tariff. Therefore, a flexible penalty contract (FPC for voltage security to be used as a direct coordination measure is proposed. In addition, the optimal coordinated management is formulated. Using the Pacific Gas and Electric Company (PG&E 69-bus test distribution network, the effectiveness of the coordination was verified by comparison with the current TOU tariff.

  9. Swarm Intelligence-Based Smart Energy Allocation Strategy for Charging Stations of Plug-In Hybrid Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Imran Rahman

    2015-01-01

    Full Text Available Recent researches towards the use of green technologies to reduce pollution and higher penetration of renewable energy sources in the transportation sector have been gaining popularity. In this wake, extensive participation of plug-in hybrid electric vehicles (PHEVs requires adequate charging allocation strategy using a combination of smart grid systems and smart charging infrastructures. Daytime charging stations will be needed for daily usage of PHEVs due to the limited all-electric range. Intelligent energy management is an important issue which has already drawn much attention of researchers. Most of these works require formulation of mathematical models with extensive use of computational intelligence-based optimization techniques to solve many technical problems. In this paper, gravitational search algorithm (GSA has been applied and compared with another member of swarm family, particle swarm optimization (PSO, considering constraints such as energy price, remaining battery capacity, and remaining charging time. Simulation results obtained for maximizing the highly nonlinear objective function evaluate the performance of both techniques in terms of best fitness.

  10. Load forecasting at substations terminals - preliminary results; Previsao de carga em saidas de subestacoes - resultados preliminares

    Energy Technology Data Exchange (ETDEWEB)

    Fidalgo, J.N. [Instituto de Engenharia de Sistema e Computadores (INESC), Porto (Portugal). E-mail: jfidalgo@inescn.pt

    1999-07-01

    This paper presents the model developed for current intensity forecasting at the substation terminals. The main objective consists of regression process definition which allows some estimations on the future values for those currents, based on related historical data. Consideration of different time scheduling is intended. Neuronal networks have been used as regression basic tool. Finally, the results obtained up to the present are presented which demonstrate that the adopted strategy and tools are suitable for the objective to be attained.

  11. Tokai earthquakes and Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    Komura, Hiroo

    1981-01-01

    Kanto district and Shizuoka Prefecture are designated as ''Observation strengthening districts'', where the possibility of earthquake occurrence is high. Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., is at the center of this district. Nuclear power stations are vulnerable to earthquakes, and if damages are caused by earthquakes in nuclear power plants, the most dreadful accidents may occur. The Chubu Electric Power Co. underestimates the possibility and scale of earthquakes and the estimate of damages, and has kept on talking that the rock bed of the power station site is strong, and there is not the fear of accidents. However the actual situation is totally different from this. The description about earthquakes and the rock bed in the application of the installation of No.3 plant was totally rewritten after two years safety examination, and the Ministry of International Trade and Industry approved the application in less than two weeks thereafter. The rock bed is geologically evaluated in this paper, and many doubtful points in the application are pointed out. In addition, there are eight active faults near the power station site. The aseismatic design of the Hamaoka Nuclear Power Station assumes the acceleration up to 400 gal, but it may not be enough. The Hamaoka Nuclear Power Station is intentionally neglected in the estimate of damages in Shizuoka Prefecture. (Kako, I.)

  12. Electrical Energy Quality Studies in 3 kV DC Electric Traction Systems for Different Schemes of Connection Traction Substation to Power Utility System

    Directory of Open Access Journals (Sweden)

    Leszek Mierzejewski

    2004-01-01

    Full Text Available The paper present aspects of DC electric traction system influence on electric energetic system. Study is based on modeling and simulation of electrified railway line. After simulation, there was performed analysis of energy quality, whitch using results of simulation and supply systems parameters.

  13. Optimal Charging of Electric Vehicles with Trading on the Intraday Electricity Market

    Directory of Open Access Journals (Sweden)

    Ilham Naharudinsyah

    2018-06-01

    Full Text Available Trading on the energy market is a possible way to reduce the electricity costs of charging electric vehicles at public charging stations. In many European countries, it is possible to trade electricity until shortly before the period of delivery on so called intraday electricity markets. In the present work, the potential for reducing the electricity costs by trading on the intraday market is investigated using the example of the German market. Based on simulations, the authors reveal that by optimizing the charging schedule together with the trading on the intraday electricity market, the costs can be reduced by around 8% compared to purchasing all the required energy from the energy supplier. By allowing the charging station operator to resell the energy to the intraday electricity market, an additional cost reduction of around 1% can be achieved. Besides the potential cost savings, the impacts of the trading unit and of the lead time of the intraday electricity market on the costs are investigated. The authors reveal that the achievable electricity costs can be strongly affected by the lead time, while the trading unit has only a minor effect on the costs.

  14. Internal Arc: People safety in the electrical wiring; Arco interno: Seguridad de las personas ante instalaciones electricas

    Energy Technology Data Exchange (ETDEWEB)

    Inchausti, J. M.

    2009-07-01

    The aim of this article is to describe the internal arc phenomenon, an extremely fast, almost explosive and unattended process of transformation form an initial electric power to the generation of a pressure and heat wave inside the medium its produced its consequences for safety, current methods of limiting them and current regulations in general for equipment used in medium-voltage electrical distribution networks. Taking into account that this type of equipment is found thought the distribution network in both public buildings and unrestricted access areas, safety (of operators and the general public) must be taken into account in the design of equipment and installations to minimize the risk of internal arcs occurring. This is the gist of, for example, ITC 16 of the Spanish Regulation on Power Plants and transformer substations. In addition to the construction aspects specific to each device in which the manufacturer has to takes steps to minimize the risks of an internal arcs occurring. This is the gist of, for example, ITC 16 of the Spanish Regulation on Power Plants and transformer substations. In addition to the construction aspects specific to each device in which an internal arc occurring, it is understood to be vitally important that users, installers and designers of Medium Voltage installations are familiar with the installation conditions stated by the manufacturer and thus avoid risks. (Author) 14 refs.

  15. A Novel Methodology for Charging Station Deployment

    Science.gov (United States)

    Sun, Zhonghao; Zhao, Yunwei; He, Yueying; Li, Mingzhe

    2018-02-01

    Lack of charging stations has been a main obstacle to the promotion of electric vehicles. This paper studies deploying charging stations in traffic networks considering grid constraints to balance the charging demand and grid stability. First, we propose a statistical model for charging demand. Then we combine the charging demand model with power grid constraints and give the formulation of the charging station deployment problem. Finally, we propose a theoretical solution for the problem by transforming it to a Markov Decision Process.

  16. Costs of producing electricity from nuclear, coal-fired and oil-fired power stations

    International Nuclear Information System (INIS)

    1980-07-01

    The Board publishes generation costs per kW h incurred at recently commissioned power stations so that the costs and performance of nuclear and conventional stations of roughly the same date of construction can be compared. The term 'conventional power station' is used to describe coal-fired and oil-fired steam power stations. The Board has now decided: (A) to supplement the past method of calculating costs at main stations commissioned between 1965 and 1977 by giving the associated figures for interest during construction, for research, and for training; (B) to give similar figures for the contemporary stations Hinkley Point B and the first half of Drax, (C) to provide estimates of generating costs of stations under construction; (D) to set out explicitly the relationship of this method of calculation to that employed in taking investment decisions on future stations. In this way the figures for stations in commission and under construction are arrived at more in line with the general principles of evaluating investment proposals. The present document provides this information. (author)

  17. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  18. H2USA: Siting Refueling Stations in the Northeast

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, Marc W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Muratori, Matteo [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zuboy, Jarett [Consultant; Ellis, Steve [Honda

    2017-11-01

    To achieve cost-effective deployment of both fuel cell electric vehicles (FCEVs) and hydrogen stations, the number of vehicles and public stations must grow together in areas of highest demand. This fact sheet introduces two advanced modeling tools and presents preliminary analysis of the hydrogen refueling station locations needed to support early consumer demand for FCEVs in the Northeast United States. United States.

  19. Lessons learned while implementing a safety parameter display system at the Comanche Peak steam electric station

    International Nuclear Information System (INIS)

    Hagar, B.

    1987-01-01

    With the completion of site Verification and Validation tests, the Safety Parameter Display System (SPDS) will be fully operational at the Comanche Peak Steam Electric Station. Implementation of the SPDS, which began in 1982, included: modifying generic Safety Assessment System Software; developing site-specific displays and features; installing and integrating system equipment into the plant; modifying station heating, ventilation, and air conditioning systems to provide necessary cooling; installing an additional uninterruptible power supply system to provide necessary power; and training station personnel in the operation and use of the system. Lessons learned during this project can be discussed in terms of an ideal SPDS implementation project. Such a project would design and implement an SPDS for a plant that is already under construction or operating, and would progress through a sequence of activities that includes: (1) developing and documenting the system design bases, and including all major design influences; (2) developing a database description and system functional specifications to clarify specific system requirements; (3) developing detailed system hardware and software design specifications to fully describe the system, and to enable identification of necessary site design changes early in the project; (4) implementing the system design; (5) configuring and extensively testing the system prior to routine system operation; and (6) tuning the system after the completion of system installation. The ideal project would include future system users in design development and system testing, and would use Verification and Validation techniques throughout the project to ensure that each sequential step is appropriate and correct

  20. Decommissioning of nuclear power stations

    International Nuclear Information System (INIS)

    Gregory, A.R.

    1988-01-01

    In the United Kingdom the Electricity Boards, the United Kingdom Atomic Energy Authority (UKAEA) and BNFL cooperate on all matters relating to the decommissioning of nuclear plant. The Central Electricity Generating Board's (CEGB) policy endorses the continuing need for nuclear power, the principle of reusing existing sites where possible and the building up of sufficient funds during the operating life of a nuclear power station to meet the cost of its complete clearance in the future. The safety of the plant is the responsibility of the licensee even in the decommissioning phase. The CEGB has carried out decommissioning studies on Magnox stations in general and Bradwell and Berkeley in particular. It has also been involved in the UKAEA Windscale AGR decommissioning programme. The options as to which stage to decommission to are considered. Methods, costs and waste management are also considered. (U.K.)