WorldWideScience

Sample records for split operator procedure

  1. Solution Procedure for Transport Modeling in Effluent Recharge Based on Operator-Splitting Techniques

    Directory of Open Access Journals (Sweden)

    Shutang Zhu

    2008-01-01

    Full Text Available The coupling of groundwater movement and reactive transport during groundwater recharge with wastewater leads to a complicated mathematical model, involving terms to describe convection-dispersion, adsorption/desorption and/or biodegradation, and so forth. It has been found very difficult to solve such a coupled model either analytically or numerically. The present study adopts operator-splitting techniques to decompose the coupled model into two submodels with different intrinsic characteristics. By applying an upwind finite difference scheme to the finite volume integral of the convection flux term, an implicit solution procedure is derived to solve the convection-dominant equation. The dispersion term is discretized in a standard central-difference scheme while the dispersion-dominant equation is solved using either the preconditioned Jacobi conjugate gradient (PJCG method or Thomas method based on local-one-dimensional scheme. The solution method proposed in this study is applied to the demonstration project of groundwater recharge with secondary effluent at Gaobeidian sewage treatment plant (STP successfully.

  2. On the additive splitting procedures and their computer realization

    DEFF Research Database (Denmark)

    Farago, I.; Thomsen, Per Grove; Zlatev, Z.

    2008-01-01

    Two additive splitting procedures are defined and studied in this paper. It is shown that these splitting procedures have good stability properties. Some other splitting procedures, which are traditionally used in mathematical models used in many scientific and engineering fields, are sketched. All...

  3. A split operator method for transient problems

    International Nuclear Information System (INIS)

    Belytschko, T.B.

    1983-01-01

    Numerous techniques have been developed for improving the computational efficiency of transient analysis: mesh partitioning, subcycling procedures and operator splitting methods. In mesh partitioning methods, the model is divided into subdomains which are integrated by different time integrators, typically implicit and explicit. Any stiff portions of the model are integrated by the implicit operator so that the size of the time step can be increased. In subcycling procedures, the stiff portions are integrated by smaller time steps, yielding similar benefits. However, in models for which the governing partial differential equations are basically of a parabolic character, explicit methods can become quite expensive for refined models because the size of the stable time step decreases with the square of the minimum element dimension. Thus explicit methods, whether employed alone or with partitioning or subcycling, have inherent limitations in these problems. A new procedure is here described for the element-by-element semi-implicit method of Hughes and coworkers which requires the solution of only small systems of equations. This procedure is described for a family of uniform gradient or strain elements which are widely used in nonlinear transient analysis. The diffusion equation and the equations of motion for both shells and continua have been treated, but only the former is considered herein. Results are presented for several examples which show the potential of this method for improving the efficiency of a large-scale linear and nonlinear computations. (orig./RW)

  4. Additive operator-difference schemes splitting schemes

    CERN Document Server

    Vabishchevich, Petr N

    2013-01-01

    Applied mathematical modeling isconcerned with solving unsteady problems. This bookshows how toconstruct additive difference schemes to solve approximately unsteady multi-dimensional problems for PDEs. Two classes of schemes are highlighted: methods of splitting with respect to spatial variables (alternating direction methods) and schemes of splitting into physical processes. Also regionally additive schemes (domain decomposition methods)and unconditionally stable additive schemes of multi-component splitting are considered for evolutionary equations of first and second order as well as for sy

  5. Automated emergency operating procedures

    International Nuclear Information System (INIS)

    Perez-Ramirez, G.; Nelson, P.F.

    1990-01-01

    This paper describes the development of a training tool for the symptom oriented emergency operating procedures used at the Laguna Verde Nuclear Power Plant. EOPs and operator training are intended to assist the operator for managing accident situations. A prototype expert system based on the EOPs has been developed for operator training. The demonstration expert system was developed using a commercial shell. The knowledge base consists of two parts. The specific operator actions to be executed for 5 selected accident sequences and the EOPs steps for the reactor pressure vessel control of the water level, pressure, and power. The knowledge is expressed in the form of IF-THEN production rules. A typical training session will display a set of conditions and will prompt the trainee to indicate the appropriate step to perform. This mode will guide the trainee through selected accident sequences. A second mode of the expert system will prompt the trainee for the current plant conditions and the expert system will respond with the EOPs which are required to be performed under these conditions. This allows the trainee to study What if situations

  6. Point-splitting regularization of composite operators and anomalies

    International Nuclear Information System (INIS)

    Novotny, J.; Schnabl, M.

    2000-01-01

    The point-splitting regularization technique for composite operators is discussed in connection with anomaly calculation. We present a pedagogical and self-contained review of the topic with an emphasis on the technical details. We also develop simple algebraic tools to handle the path ordered exponential insertions used within the covariant and non-covariant version of the point-splitting method. The method is then applied to the calculation of the chiral, vector, trace, translation and Lorentz anomalies within diverse versions of the point-splitting regularization and a connection between the results is described. As an alternative to the standard approach we use the idea of deformed point-split transformation and corresponding Ward-Takahashi identities rather than an application of the equation of motion, which seems to reduce the complexity of the calculations. (orig.)

  7. Soil Sampling Operating Procedure

    Science.gov (United States)

    EPA Region 4 Science and Ecosystem Support Division (SESD) document that describes general and specific procedures, methods, and considerations when collecting soil samples for field screening or laboratory analysis.

  8. A Quantitative Analysis of Children's Splitting Operations and Fraction Schemes

    Science.gov (United States)

    Norton, Anderson; Wilkins, Jesse L. M.

    2009-01-01

    Teaching experiments with pairs of children have generated several hypotheses about students' construction of fractions. For example, Steffe (2004) hypothesized that robust conceptions of improper fractions depends on the development of a splitting operation. Results from teaching experiments that rely on scheme theory and Steffe's hierarchy of…

  9. A Procedure for Splitting Processes and its Application to Coordination (Technical Report)

    NARCIS (Netherlands)

    S.-S.T.Q. Jongmans (Sung-Shik); D.G. Clarke (David); J.M.P. Proença (Jose)

    2012-01-01

    textabstractWe present a procedure for splitting processes in a process algebra with multi-actions (a subset of the specification language mCRL2). This splitting procedure cuts a process into two processes along a set of actions A: roughly, one of these processes contains no actions from A, while

  10. Electronic Procedures for Medical Operations

    Science.gov (United States)

    2015-01-01

    Electronic procedures are replacing text-based documents for recording the steps in performing medical operations aboard the International Space Station. S&K Aerospace, LLC, has developed a content-based electronic system-based on the Extensible Markup Language (XML) standard-that separates text from formatting standards and tags items contained in procedures so they can be recognized by other electronic systems. For example, to change a standard format, electronic procedures are changed in a single batch process, and the entire body of procedures will have the new format. Procedures can be quickly searched to determine which are affected by software and hardware changes. Similarly, procedures are easily shared with other electronic systems. The system also enables real-time data capture and automatic bookmarking of current procedure steps. In Phase II of the project, S&K Aerospace developed a Procedure Representation Language (PRL) and tools to support the creation and maintenance of electronic procedures for medical operations. The goal is to develop these tools in such a way that new advances can be inserted easily, leading to an eventual medical decision support system.

  11. Operating procedures and safety culture

    International Nuclear Information System (INIS)

    Carnino, A.

    1993-01-01

    The development of new technologies in recent years has led to a tremendous increase in the information to be mastered by operators in industrial processes. The information at operators disposal both in routine situations and accidental ones needs to be well prepared and organized to ensure reliability and safety. The man-machine interface should give operators all the necessary and clear indications on the process status and evolution so that the operators can operate the installation through adequate procedures. Procedures represent the real interface and mode of action of the operators on the machine, and they are of prime importance. Although they are by essence quite different, the routine, accident, and emergency procedures have in common one attribute: They all require a good safety culture both in their development and their implementation. From the definition given by the members of the International Nuclear Safety Advisory Group (INSAG), open-quotes Safety culture is that assembly of characteristics and attitudes in organizations and individuals which establishes that, as an overriding priority, nuclear plant safety issues receive the attention warranted by their significance,close quotes one can see that two aspects are embedded, a collective attitude that in fact is reflected in the managerial framework and an individual one that is linked to personnel behavior and work practices

  12. An Operator-Integration-Factor Splitting (OIFS) method for Incompressible Flows in Moving Domains

    Energy Technology Data Exchange (ETDEWEB)

    Patel, Saumil S. [Argonne National Lab. (ANL), Argonne, IL (United States); Fischer, Paul F. [Argonne National Lab. (ANL), Argonne, IL (United States); Univ. of Illinois, Urbana-Champaign, IL (United States); Min, Misun [Argonne National Lab. (ANL), Argonne, IL (United States); Tomboulides, Ananias G [Argonne National Lab. (ANL), Argonne, IL (United States); Aristotle Univ., Thessaloniki (Greece)

    2017-10-21

    In this paper, we present a characteristic-based numerical procedure for simulating incompressible flows in domains with moving boundaries. Our approach utilizes an operator-integration-factor splitting technique to help produce an effcient and stable numerical scheme. Using the spectral element method and an arbitrary Lagrangian-Eulerian formulation, we investigate flows where the convective acceleration effects are non-negligible. Several examples, ranging from laminar to turbulent flows, are considered. Comparisons with a standard, semi-implicit time-stepping procedure illustrate the improved performance of the scheme.

  13. Computer managed emergency operating procedures

    International Nuclear Information System (INIS)

    Salamun, I.; Mavko, B.; Stritar, A.

    1994-01-01

    New computer technology is a very effective tool for developing a new design of nuclear power plant control room. It allows designer possibility to create a tool for managing with large database of power plant parameters and displaying them in different graphic forms and possibility of automated execution of well known task. The structure of Emergency Operating Procedures (EOP) is very suitable for programming and for creating expert system. The Computerized Emergency Operating Procedures (CEOP) described in this paper can be considered as an upgrading of standard EOP approach. EmDiSY (Emergency Display System - computer code name for CEOP) main purpose is to supply the operator with necessary information, to document all operator actions and to execute well known tasks. It is a function oriented CEOP that gives operator guidance on how to verify the critical safety functions and how to restore and maintain these functions where they are degraded. All knowledge is coded and stored in database files. The knowledge base consists from stepping order for verifying plant parameters, desired values of parameters, conditions for comparison and links between procedures and actions. Graphical shell allows users to read database, to follow instruction and to find out correct task. The desired information is concentrated in one screen and allows users to focus on a task. User is supported in two ways: desired parameter values are displayed on the process picture and automated monitoring critical safety function status trees are all time in progress and available to the user. (author). 4 refs, 4 figs

  14. Sparse Parallel MRI Based on Accelerated Operator Splitting Schemes.

    Science.gov (United States)

    Cai, Nian; Xie, Weisi; Su, Zhenghang; Wang, Shanshan; Liang, Dong

    2016-01-01

    Recently, the sparsity which is implicit in MR images has been successfully exploited for fast MR imaging with incomplete acquisitions. In this paper, two novel algorithms are proposed to solve the sparse parallel MR imaging problem, which consists of l 1 regularization and fidelity terms. The two algorithms combine forward-backward operator splitting and Barzilai-Borwein schemes. Theoretically, the presented algorithms overcome the nondifferentiable property in l 1 regularization term. Meanwhile, they are able to treat a general matrix operator that may not be diagonalized by fast Fourier transform and to ensure that a well-conditioned optimization system of equations is simply solved. In addition, we build connections between the proposed algorithms and the state-of-the-art existing methods and prove their convergence with a constant stepsize in Appendix. Numerical results and comparisons with the advanced methods demonstrate the efficiency of proposed algorithms.

  15. FFTF operations procedures preparation guide. Revision 2

    International Nuclear Information System (INIS)

    1976-12-01

    The Guide is intended to provide guidelines for the initial preparation of FFTF Operating Procedures. The Procedures Preparation Guide was developed from the plan presented and approved in the FFTF Reactor Plant Procedures Plan, PC-1, Revision 3

  16. Soil Gas Sampling Operating Procedure

    Science.gov (United States)

    EPA Region 4 Science and Ecosystem Support Division (SESD) document that describes general and specific procedures, methods, and considerations when collecting soil gas samples for field screening or laboratory analysis.

  17. Operant Variability: Procedures and Processes

    Science.gov (United States)

    Machado, Armando; Tonneau, Francois

    2012-01-01

    Barba's (2012) article deftly weaves three main themes in one argument about operant variability. From general theoretical considerations on operant behavior (Catania, 1973), Barba derives methodological guidelines about response differentiation and applies them to the study of operant variability. In the process, he uncovers unnoticed features of…

  18. Developing, adopting and adapting operating procedures

    International Nuclear Information System (INIS)

    Rabouhams, J.

    1986-01-01

    This lecture specifies all the dispositions which have been taken by EDF Nuclear and Fossil Generation Department - according to the fact that availability and safety largely depend on the quality of the procedures and their easy handling - in order to develop, adopt and adapt the operating procedures. The following points are treated: General organization of procedures for plant operation during normal and abnormal conditions; Personnel and extend of responsibility involved into the development of procedures (research center, training center, specialized services, nuclear station, etc.); Validation of the procedures by means of full-scope simulators; Modifications of the procedures taking into account operation experience in material and human fields; Development of simulation softs in order to perform the procedures in abnormal situations; Evolution of operating technics and future skills. (orig.)

  19. MITS Feed and Withdrawal Subsystem: operating procedures

    International Nuclear Information System (INIS)

    Brown, W.S.

    1980-01-01

    This procedure details the steps required to provide continuous feed flow and withdrawal of process product and waste flows in support of thruput operation in the cascade or its elements. It particularly requires operator attention to safety considerations

  20. MITS Feed and Withdrawal Subsystem: operating procedures

    International Nuclear Information System (INIS)

    Brown, W.S.

    1980-01-01

    This document details procedures for the operation of the MITS (Machine Interface Test System) Feed and Withdrawal Subsystem (F and W). Included are fill with UF 6 , establishment of recycle and thruput flows, shutdown, UF 6 makeup, dump to supply container, Cascade dump to F and W, and lights cold trap dump, all normal procedures, plus an alternate procedure for trapping light gases

  1. 40 CFR 68.52 - Operating procedures.

    Science.gov (United States)

    2010-07-01

    ...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 2 Prevention Program § 68.52 Operating procedures. (a) The... for safely conducting activities associated with each covered process consistent with the safety information for that process. Operating procedures or instructions provided by equipment manufacturers or...

  2. An Automated Inpatient Split-dose Bowel Preparation System Improves Colonoscopy Quality and Reduces Repeat Procedures.

    Science.gov (United States)

    Yadlapati, Rena; Johnston, Elyse R; Gluskin, Adam B; Gregory, Dyanna L; Cyrus, Rachel; Werth, Lindsay; Ciolino, Jody D; Grande, David P; Keswani, Rajesh N

    2017-07-19

    Inpatient colonoscopy preparations are often inadequate, compromising patient safety and procedure quality, while resulting in greater hospital costs. The aims of this study were to: (1) design and implement an electronic inpatient split-dose bowel preparation order set; (2) assess the intervention's impact upon preparation adequacy, repeated colonoscopies, hospital days, and costs. We conducted a single center prospective pragmatic quasiexperimental study of hospitalized adults undergoing colonoscopy. The experimental intervention was designed using DMAIC (define, measure, analyze, improve, and control) methodology. Prospective data collected over 12 months were compared with data from a historical preintervention cohort. The primary outcome was bowel preparation quality and secondary outcomes included number of repeated procedures, hospital days, and costs. On the basis of a Delphi method and DMAIC process, we created an electronic inpatient bowel preparation order set inclusive of a split-dose bowel preparation algorithm, automated orders for rescue medications, and nursing bowel preparation checks. The analysis data set included 969 patients, 445 (46%) in the postintervention group. The adequacy of bowel preparation significantly increased following intervention (86% vs. 43%; P<0.01) and proportion of repeated procedures decreased (2.0% vs. 4.6%; P=0.03). Mean hospital days from bowel preparation initiation to discharge decreased from 8.0 to 6.9 days (P=0.02). The intervention resulted in an estimated 1-year cost-savings of $46,076 based on a reduction in excess hospital days associated with repeated and delayed procedures. Our interdisciplinary initiative targeting inpatient colonoscopy preparations significantly improved quality and reduced repeat procedures, and hospital days. Other institutions should consider utilizing this framework to improve inpatient colonoscopy value.

  3. Caustic addition system operability test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  4. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  5. Electronic Procedures for Medical Operations, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Electronic procedures are currently being used to document the steps in performing medical operations for the Space Shuttle and/or the International Space Station...

  6. Piezosurgery for Sagittal Split Osteotomy: Procedure Duration and Postoperative Sensory Perturbation.

    Science.gov (United States)

    Köhnke, Robert; Kolk, Andreas; Kluwe, Lan; Ploder, Oliver

    2017-09-01

    To evaluate piezosurgery for bilateral sagittal split osteotomy (BSSO) for its duration and inferior alveolar nerve (IAN) perturbation. In this prospective randomized study, the authors evaluated 100 BSSO procedures in 50 patients. Piezoelectric (group I) and conventional (group II) osteotomies were carried out on each side of the mandible of a patient by 2 specialists. The surgeons had at least 1 year of experience using piezosurgery. The period from incision to complete splitting of the mandibular bone was recorded (ie, procedure duration). The intraoperative status (visibility and relocation) of the IAN also was recorded. The neurosensory function of the IAN was measured by the 2-point discrimination threshold and static light touch methods before surgery and postoperatively (1, 3, and 6 weeks and 6 and 12 months). Parameters were compared between the test groups by the paired t, nonparametric Wilcoxon, or χ 2 test. Intergroup comparison showed the mean duration of osteotomy was significantly shorter for group I (17 ± 6 vs 25 ± 9 minutes; P < .001). The rate of intraoperative exposures of the IAN was slightly lower for group I (68%) compared with group II (81%). However, the difference was not relevant. Neurosensory disturbance and recovery of the IAN did not differ between groups. Piezoelectric osteotomy requires considerably less time than conventional mechanical approaches, but shows no advantage in preventing neurosensory perturbation. Copyright © 2017 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  7. Magnetic fusion energy. Disaster operation procedures

    International Nuclear Information System (INIS)

    1986-06-01

    In a major disaster such as an earthquake, toxic chemical release, or fire, these Disaster Operations Procedures can be used, in combination with good judgment, to minimize the risk of injury to personnel and of property damage in our laboratory, shop, and office areas. These emergency procedures apply to all personnel working within MFE/Zone-11 area including visitors, program contract personnel, and construction contract personnel

  8. Operator use of procedures during simulated emergencies

    Energy Technology Data Exchange (ETDEWEB)

    Roth, E.M.; Mumaw, R.J.; Lewis, P.M.

    1995-04-01

    This paper summarizes the results of an empirical study of nuclear power plant operator performance in cognitively demanding simulated emergencies. During emergencies operators follow highly prescriptive written procedures. The objectives of the study were to understand and document what role higher-level cognitive activities such as diagnosis, or more generally {open_quotes}situation assessment,{close_quotes} play in guiding operator performance, given that operators utilize procedures in responding to the events. The study examined crew performance in variants of two simulated emergencies: (1) an Interfacing System Loss of Coolant Accident and (2) a Loss of Heat Sink scenario. Data on operator performance were collected using training simulators at two plant sites. Up to 11 crews from each plant participated in each of two simulated emergencies for a total of 38 cases analyzed. Crew performance was videotaped and partial transcripts were produced and analyzed. The results revealed a number of instances where higher-level cognitive activities such as situation assessment and response planning enabled operators to handle aspects of the situation that were not fully addressed by the procedures. The paper summarizes these cases and their implications for the development and evaluation of training and control room aids, as well as for human reliability analyses. The full report of the study is published as NUREG/CR-6208.

  9. Operator use of procedures during simulated emergencies

    International Nuclear Information System (INIS)

    Roth, E.M.; Mumaw, R.J.; Lewis, P.M.

    1995-01-01

    This paper summarizes the results of an empirical study of nuclear power plant operator performance in cognitively demanding simulated emergencies. During emergencies operators follow highly prescriptive written procedures. The objectives of the study were to understand and document what role higher-level cognitive activities such as diagnosis, or more generally ' situation assessment,' play in guiding operator performance, given that operators utilize procedures in responding to the events. The study examined crew performance in variants of two simulated emergencies: (1) an Interfacing System Loss of Coolant Accident and (2) a Loss of Heat Sink scenario. Data on operator performance were collected using training simulators at two plant sites. Up to 11 crews from each plant participated in each of two simulated emergencies for a total of 38 cases analyzed. Crew performance was videotaped and partial transcripts were produced and analyzed. The results revealed a number of instances where higher-level cognitive activities such as situation assessment and response planning enabled operators to handle aspects of the situation that were not fully addressed by the procedures. The paper summarizes these cases and their implications for the development and evaluation of training and control room aids, as well as for human reliability analyses. The full report of the study is published as NUREG/CR-6208

  10. Control procedure for well drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Bourdon, J C

    1988-09-09

    A control procedure of rotary drilling operations is proposed. It uses the Drill off test. The drill-off test permits to determine the rock drill speed variation as a function of the wright applied on the top of the pipe. We can deduce from that a rock drill wear parameter. The method permits to prevent a rupture and its grave economic consequences.

  11. 40 CFR 68.69 - Operating procedures.

    Science.gov (United States)

    2010-07-01

    ...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including... instructions for safely conducting activities involved in each covered process consistent with the process...

  12. Military Publications, Index of Test Operations Procedures

    Science.gov (United States)

    1981-10-01

    serial number, aad design information for majur components. Prescribes vehicle, major component, and system descrip- tive elements required; such as...mount operating characteristics. Discusses preparation for test, instrumentation, and facil- ities. Describes procedures for force measurement, carriage...backlash and accuracy, turret friction, gun balance, manual handcrank force , manual response ratio, weapon and sighting system backlash, power controller

  13. Development of symptoms-oriented operating procedures

    International Nuclear Information System (INIS)

    Colquhoun, R.

    1984-01-01

    Until recently, the formal treatment of control room procedures for upset conditions in nuclear power plants has been event-oriented. This orientation was not so much a reflection of power plant operating practice as it was a reflection of design-oriented thinking - design-basis events, therefore event-oriented procedures. Event orientation is not common in other professions. In the medical profession, for example, the stabilization of vital functions through a symptoms-oriented approach has priority over diagnosis and prognosis. The American nuclear power industry has initiated programs for the development and application of a symptoms-oriented approach for handling upset conditions. Canadian programs have independently paralleled the US programs. This article describes the rationale and current applications of the Canadian programs and identifies the relevance of a generic symptoms-based emergency procedure to current operating practices

  14. Semi-implicit iterative methods for low Mach number turbulent reacting flows: Operator splitting versus approximate factorization

    Science.gov (United States)

    MacArt, Jonathan F.; Mueller, Michael E.

    2016-12-01

    Two formally second-order accurate, semi-implicit, iterative methods for the solution of scalar transport-reaction equations are developed for Direct Numerical Simulation (DNS) of low Mach number turbulent reacting flows. The first is a monolithic scheme based on a linearly implicit midpoint method utilizing an approximately factorized exact Jacobian of the transport and reaction operators. The second is an operator splitting scheme based on the Strang splitting approach. The accuracy properties of these schemes, as well as their stability, cost, and the effect of chemical mechanism size on relative performance, are assessed in two one-dimensional test configurations comprising an unsteady premixed flame and an unsteady nonpremixed ignition, which have substantially different Damköhler numbers and relative stiffness of transport to chemistry. All schemes demonstrate their formal order of accuracy in the fully-coupled convergence tests. Compared to a (non-)factorized scheme with a diagonal approximation to the chemical Jacobian, the monolithic, factorized scheme using the exact chemical Jacobian is shown to be both more stable and more economical. This is due to an improved convergence rate of the iterative procedure, and the difference between the two schemes in convergence rate grows as the time step increases. The stability properties of the Strang splitting scheme are demonstrated to outpace those of Lie splitting and monolithic schemes in simulations at high Damköhler number; however, in this regime, the monolithic scheme using the approximately factorized exact Jacobian is found to be the most economical at practical CFL numbers. The performance of the schemes is further evaluated in a simulation of a three-dimensional, spatially evolving, turbulent nonpremixed planar jet flame.

  15. Energy conservation aircraft design and operational procedures

    Energy Technology Data Exchange (ETDEWEB)

    Poisson-Quinton, P.

    1978-01-01

    The paper reviews studies associated with improved fuel efficiency. Several aircraft design concepts are described including: (1) increases in aerodynamic efficiency through decreased friction drag, parasitic drag, and drag due to lift, (2) structural efficiency and the implementation of composite materials, (3) active control technology, (4) the optimization of airframe-engine integration, and (5) VTOL and STOL concepts. Consideration is also given to operational procedures associated with flight management, terminal-area operations, and the influence of environmental noise constraints on fuel economy.

  16. Comparing the operators' behavior in conducting emergency operating procedures with the complexity of procedural steps

    International Nuclear Information System (INIS)

    Park, Jin Kyun; Jung, Won Dea

    2003-01-01

    Many kinds of procedures have been used to reduce the operators' workload throughout various industries. However, significant portion of accidents or incidents was caused by procedure related human errors that are originated from non-compliance of procedures. According to related studies, several important factors for non-compliance behavior have been identified, and one if them is the complexity of procedures. This means that comparing the change of the operators' behavior with the complexity of procedures may be meaningful for investigating plausible reasons for the operators' non-compliance behavior. In this study, emergency training records were collected using a full scope simulator in order to obtain data related to the operators' non-compliance behavior. And then, collected data are compared with the complexity of procedural steps. As the result, two remarkable relationships are found, which indicate that the operators' behavior could be reasonably characterized by the complexity of procedural steps. Thus, these relationships can be used as meaningful clues not only to scrutinize the reason of non-compliance behavior but also to suggest appropriate remedies for the reduction of non-compliance behavior that can result in procedure related human errors

  17. Operator splitting method for simulation of dynamic flows in natural gas pipeline networks

    Science.gov (United States)

    Dyachenko, Sergey A.; Zlotnik, Anatoly; Korotkevich, Alexander O.; Chertkov, Michael

    2017-12-01

    We develop an operator splitting method to simulate flows of isothermal compressible natural gas over transmission pipelines. The method solves a system of nonlinear hyperbolic partial differential equations (PDEs) of hydrodynamic type for mass flow and pressure on a metric graph, where turbulent losses of momentum are modeled by phenomenological Darcy-Weisbach friction. Mass flow balance is maintained through the boundary conditions at the network nodes, where natural gas is injected or withdrawn from the system. Gas flow through the network is controlled by compressors boosting pressure at the inlet of the adjoint pipe. Our operator splitting numerical scheme is unconditionally stable and it is second order accurate in space and time. The scheme is explicit, and it is formulated to work with general networks with loops. We test the scheme over range of regimes and network configurations, also comparing its performance with performance of two other state of the art implicit schemes.

  18. Accurate reaction-diffusion operator splitting on tetrahedral meshes for parallel stochastic molecular simulations

    Energy Technology Data Exchange (ETDEWEB)

    Hepburn, I.; De Schutter, E., E-mail: erik@oist.jp [Computational Neuroscience Unit, Okinawa Institute of Science and Technology Graduate University, Onna, Okinawa 904 0495 (Japan); Theoretical Neurobiology & Neuroengineering, University of Antwerp, Antwerp 2610 (Belgium); Chen, W. [Computational Neuroscience Unit, Okinawa Institute of Science and Technology Graduate University, Onna, Okinawa 904 0495 (Japan)

    2016-08-07

    Spatial stochastic molecular simulations in biology are limited by the intense computation required to track molecules in space either in a discrete time or discrete space framework, which has led to the development of parallel methods that can take advantage of the power of modern supercomputers in recent years. We systematically test suggested components of stochastic reaction-diffusion operator splitting in the literature and discuss their effects on accuracy. We introduce an operator splitting implementation for irregular meshes that enhances accuracy with minimal performance cost. We test a range of models in small-scale MPI simulations from simple diffusion models to realistic biological models and find that multi-dimensional geometry partitioning is an important consideration for optimum performance. We demonstrate performance gains of 1-3 orders of magnitude in the parallel implementation, with peak performance strongly dependent on model specification.

  19. RTOD-photo operations and procedures manual

    Energy Technology Data Exchange (ETDEWEB)

    1966-03-15

    This document presents a survey of the EG&G NRDS photographic operation in four major sections and includes the work scope, procedures, some technical backgrounding and operational information. Two sections, Instrumentation and Photo Systems, include the areas of direct responsibilities while a section on Film Handling and Coordination and a section covering special information, pertinent to the project, are included to adequately complete this survey. The photographic group is housed in two trailers within the control point area at NRDS and from these trailers provides photographic support at a number of locations. Four camera bunkers, three camera towers, a kinescope system, a microfilm system and remote camera controls comprise the facilities that the group maintains and operates outside these trailers. The work load includes major items such as: motion picture coverage of the nuclear rocket engine tests, data record microfilming, kinescope recording, and documentary coverage of the company related operational responsibilities. In addition, a number of minor photographic services are extended, when required. The nature of the work, because of its importance within the research and development efforts at NRDS, requires optimum quality and efficiency throughout. The many procedures outlined here have been designed to satisfy these requirements.

  20. Operating-procedure system at Savannah River Plant

    International Nuclear Information System (INIS)

    Tope, C.W.

    1981-05-01

    Three types of procedures are widely used at SRP: Du Pont Savannah Operating Logsheet, Du Pont Savannah Operating Procedure, and Plant Manual. This document briefly reviews originating of the procedures, their preparation, control, and indexing

  1. Weak and Strong Convergence of an Algorithm for the Split Common Fixed-Point of Asymptotically Quasi-Nonexpansive Operators

    Directory of Open Access Journals (Sweden)

    Yazheng Dang

    2013-01-01

    Full Text Available Inspired by the Moudafi (2010, we propose an algorithm for solving the split common fixed-point problem for a wide class of asymptotically quasi-nonexpansive operators and the weak and strong convergence of the algorithm are shown under some suitable conditions in Hilbert spaces. The algorithm and its convergence results improve and develop previous results for split feasibility problems.

  2. INERT Atmosphere confinement operability test procedure

    International Nuclear Information System (INIS)

    RISENMAY, H.R.

    1999-01-01

    This Operability Test Procedure (OTP) provides instructions for testing operability of the Inert Atmosphere Confinement (IAC). The Inert Atmosphere Confinement was designed and built for opening cans of metal items that might have hydrided surfaces. Unreviewed Safety Question (USQ) PFP-97-005 addresses the discovery of suspected plutonium hydride forming on plutonium metal currently stored in the Plutonium Finishing Plant vaults. Plutonium hydride reacts quickly with air, liberating energy. The Inert Atmosphere Confinement was designed to prevent this sudden liberation of energy by opening the material in an inert argon atmosphere instead of the normal glovebox atmosphere. The IAC is located in glovebox HC-21A, room 230B of the 234-5Z Building at the Plutonium Finishing Plant (PFP) in the 200-West Area of the Hanford Site

  3. FFT-split-operator code for solving the Dirac equation in 2+1 dimensions

    Science.gov (United States)

    Mocken, Guido R.; Keitel, Christoph H.

    2008-06-01

    The main part of the code presented in this work represents an implementation of the split-operator method [J.A. Fleck, J.R. Morris, M.D. Feit, Appl. Phys. 10 (1976) 129-160; R. Heather, Comput. Phys. Comm. 63 (1991) 446] for calculating the time-evolution of Dirac wave functions. It allows to study the dynamics of electronic Dirac wave packets under the influence of any number of laser pulses and its interaction with any number of charged ion potentials. The initial wave function can be either a free Gaussian wave packet or an arbitrary discretized spinor function that is loaded from a file provided by the user. The latter option includes Dirac bound state wave functions. The code itself contains the necessary tools for constructing such wave functions for a single-electron ion. With the help of self-adaptive numerical grids, we are able to study the electron dynamics for various problems in 2+1 dimensions at high spatial and temporal resolutions that are otherwise unachievable. Along with the position and momentum space probability density distributions, various physical observables, such as the expectation values of position and momentum, can be recorded in a time-dependent way. The electromagnetic spectrum that is emitted by the evolving particle can also be calculated with this code. Finally, for planning and comparison purposes, both the time-evolution and the emission spectrum can also be treated in an entirely classical relativistic way. Besides the implementation of the above-mentioned algorithms, the program also contains a large C++ class library to model the geometric algebra representation of spinors that we use for representing the Dirac wave function. This is why the code is called "Dirac++". Program summaryProgram title: Dirac++ or (abbreviated) d++ Catalogue identifier: AEAS_v1_0 Program summary URL:http://cpc.cs.qub.ac.uk/summaries/AEAS_v1_0.html Program obtainable from: CPC Program Library, Queen's University, Belfast, N. Ireland Licensing

  4. Examination of post operative split lung function using quantitative xenon 133 (133Xe) inhalation scan

    International Nuclear Information System (INIS)

    Omote, Yoshiharu; Maeda, Tomio; Ikeda, Koichiro; Kubo, Yoshihiko

    1992-01-01

    133 Xe inhalation scan and ordinary lung function testing were performed three times in 34 patients undergoing pulmonary resection: before surgery, and one and six months postoperatively. Forced vital capacity (FVC) and forced expiratory volume in the first second (FEV 1.0 ) were used as spirometric parameters. From the 133 Xe inhalation scan, a split lung capacity (right to left, upper, middle and lower) and T1/2 (time required for half of the inhalation of 133 Xe gas to be expired) were calculated by computer and used as indices of split lung capacity and ventilation, respectively. The predicted postoperative lung functions were calculated using preoperative spirometric respiratory function and 133 Xe inhalation data according to the formula reported by Ali and associates. At sixth postoperative month, both predicted FVC (r=0.895, p 1.0 (r=0.897, p<0.001) correlated highly with those actually observed. These results appear to be very useful for preoperative evaluation of operative indications and the choice of surgical method. The ratios of observed to predicted lung capacity in the post operative state were examined by splitting the right and left lung and the means±S.D.(%) were 80.5±9.7% on the operated side and 119.2±11.7% on the opposite side one month after surgery. Six months after surgery, the corresponding figures were 111.0±5.6% and 96.7±16.4%. The post operative T1/2 values on the operated sides were about 2.4 times the preoperative values at one month after surgery but returned to the preoperative values by the six postoperative month. From these results, it can be said that respiratory functions after pulmonary resection are maintained primarily by compensatory lung function of opposite and operated sides at one and six months, respectively. These results also provide valuable information on postoperative respiratory care for patients who have undergone lung resection. (author)

  5. Guideline for the preparation of safe operating procedures

    International Nuclear Information System (INIS)

    Stinnett, L.; Carroll, M.M.; Crooks, D.L.; Doyle, J.R.; Jeblick, H.G.; Kessel, D.S.; Tippy, M.W.; Stuckey, J.M.

    1981-03-01

    These procedures are written for activities that involve the use of explosives, dangerous chemicals, radioactive materials, hazardous sytems, and for certain types of operational facilities which present hazards. This guideline presents a suggested Safe Operating Procedures format

  6. Total-variation based velocity inversion with Bregmanized operator splitting algorithm

    Science.gov (United States)

    Zand, Toktam; Gholami, Ali

    2018-04-01

    Many problems in applied geophysics can be formulated as a linear inverse problem. The associated problems, however, are large-scale and ill-conditioned. Therefore, regularization techniques are needed to be employed for solving them and generating a stable and acceptable solution. We consider numerical methods for solving such problems in this paper. In order to tackle the ill-conditioning of the problem we use blockiness as a prior information of the subsurface parameters and formulate the problem as a constrained total variation (TV) regularization. The Bregmanized operator splitting (BOS) algorithm as a combination of the Bregman iteration and the proximal forward backward operator splitting method is developed to solve the arranged problem. Two main advantages of this new algorithm are that no matrix inversion is required and that a discrepancy stopping criterion is used to stop the iterations, which allow efficient solution of large-scale problems. The high performance of the proposed TV regularization method is demonstrated using two different experiments: 1) velocity inversion from (synthetic) seismic data which is based on Born approximation, 2) computing interval velocities from RMS velocities via Dix formula. Numerical examples are presented to verify the feasibility of the proposed method for high-resolution velocity inversion.

  7. 21 CFR 120.6 - Sanitation standard operating procedures.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Sanitation standard operating procedures. 120.6... Provisions § 120.6 Sanitation standard operating procedures. (a) Sanitation controls. Each processor shall have and implement a sanitation standard operating procedure (SSOP) that addresses sanitation...

  8. Matching-pursuit/split-operator Fourier-transform simulations of nonadiabatic quantum dynamics

    Science.gov (United States)

    Wu, Yinghua; Herman, Michael F.; Batista, Victor S.

    2005-03-01

    A rigorous and practical approach for simulations of nonadiabatic quantum dynamics is introduced. The algorithm involves a natural extension of the matching-pursuit/split-operator Fourier-transform (MP/SOFT) method [Y. Wu and V. S. Batista, J. Chem. Phys. 121, 1676 (2004)] recently developed for simulations of adiabatic quantum dynamics in multidimensional systems. The MP/SOFT propagation scheme, extended to nonadiabatic dynamics, recursively applies the time-evolution operator as defined by the standard perturbation expansion to first-, or second-order, accuracy. The expansion is implemented in dynamically adaptive coherent-state representations, generated by an approach that combines the matching-pursuit algorithm with a gradient-based optimization method. The accuracy and efficiency of the resulting propagation method are demonstrated as applied to the canonical model systems introduced by Tully for testing simulations of dual curve-crossing nonadiabatic dynamics.

  9. Managing Operating Procedures in Distributed Collaborative Projects

    Science.gov (United States)

    Hool, A.; Beuzelin Ollivier, M.-G.; Roubert, F.

    2013-04-01

    In recent years, large distributed collaborative projects have become very prominent in scientific research, allowing exchanges between laboratories located in different institutions and countries and between various domains of competence. Particularly the work on nanotoxicity - a field which has only been under investigation for a few years and is still lacking regulatory framework - highlighted the need for well-controlled methods, as well as rules for the handling and disposal of used materials. To obtain comparable and reproducible results of experiments conducted in a distributed context, the standardisation and proper documentation of the applied methods is crucial. The European project NanoDiaRA, whose aim is to develop nanoparticles and biomarkers for the early diagnosis of inflammatory disease, faces this situation as it involves 15 European partners and brings together different scientific cultures and professional backgrounds. Protocols especially developed for Superparamagnetic Iron Oxide Nanoparticles and a management system were designed and implemented within the NanoDiaRA project to fulfil those needs. The main goals were the establishment of standardised Standard Operating Procedures assuring transparency and reproducibility and the provision of access to these protocols to every project partner, as well as their clear allocation to carry out precise measurements and production steps.

  10. Managing Operating Procedures in Distributed Collaborative Projects

    International Nuclear Information System (INIS)

    Hool, A; Ollivier, M-G Beuzelin; Roubert, F

    2013-01-01

    In recent years, large distributed collaborative projects have become very prominent in scientific research, allowing exchanges between laboratories located in different institutions and countries and between various domains of competence. Particularly the work on nanotoxicity – a field which has only been under investigation for a few years and is still lacking regulatory framework – highlighted the need for well-controlled methods, as well as rules for the handling and disposal of used materials. To obtain comparable and reproducible results of experiments conducted in a distributed context, the standardisation and proper documentation of the applied methods is crucial. The European project NanoDiaRA, whose aim is to develop nanoparticles and biomarkers for the early diagnosis of inflammatory disease, faces this situation as it involves 15 European partners and brings together different scientific cultures and professional backgrounds. Protocols especially developed for Superparamagnetic Iron Oxide Nanoparticles and a management system were designed and implemented within the NanoDiaRA project to fulfil those needs. The main goals were the establishment of standardised Standard Operating Procedures assuring transparency and reproducibility and the provision of access to these protocols to every project partner, as well as their clear allocation to carry out precise measurements and production steps.

  11. Infection Risk in Sterile Operative Procedures.

    Science.gov (United States)

    Tacconelli, Evelina; Müller, Niklas F; Lemmen, Sebastian; Mutters, Nico T; Hagel, Stefan; Meyer, Elisabeth

    2016-04-22

    The main objective of hospital hygiene and infection prevention is to protect patients from preventable nosocomial infections. It was recently stated that the proper goal should be for zero infection rates in sterile surgical procedures. In this article, we attempt to determine whether this demand is supported by the available literature. We systematically searched the Medline and EMBASE databases for studies published in the last 10 years on the efficacy of infection control measures and carried out a meta-analysis according to the PRISMA tool. We used the following search terms: "aseptic surgery," "intervention," "surgical site infection," "nosocomial infection," "intervention," and "prevention." 2277 articles were retrieved, of which 204 were acquired in full text and analyzed. The quantitative analysis included 7 prospective cohort studies on the reduction of nosocomial infection rates after aseptic surgery. The measures used included training sessions, antibiotic prophylaxis, and operative-site disinfection and cleaning techniques. These interventions succeeded in reducing postoperative wound infections (relative risk (RR] 0.99 [0.98; 1.00]). Subgroup analyses on antibiotic prophylaxis (RR 0.99 [0.98; 1.01]) and noncontrolled trials (RR 0.97 [0.92; 1.02]) revealed small, insignificant effects. A multimodal approach with the participation of specialists from various disciplines can further reduce the rate of postoperative infection. A reduction to zero is not realistic and is not supported by available evidence.

  12. Operator Splitting Methods for Degenerate Convection-Diffusion Equations I: Convergence and Entropy Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Holden, Helge; Karlsen, Kenneth H.; Lie, Knut-Andreas

    1999-10-01

    We present and analyze a numerical method for the solution of a class of scalar, multi-dimensional, nonlinear degenerate convection-diffusion equations. The method is based on operator splitting to separate the convective and the diffusive terms in the governing equation. The nonlinear, convective part is solved using front tracking and dimensional splitting, while the nonlinear diffusion equation is solved by a suitable difference scheme. We verify L{sup 1} compactness of the corresponding set of approximate solutions and derive precise entropy estimates. In particular, these results allow us to pass to the limit in our approximations and recover an entropy solution of the problem in question. The theory presented covers a large class of equations. Important subclasses are hyperbolic conservation laws, porous medium type equations, two-phase reservoir flow equations, and strongly degenerate equations coming from the recent theory of sedimentation-consolidation processes. A thorough numerical investigation of the method analyzed in this paper (and similar methods) is presented in a companion paper. (author)

  13. Aligning workload control theory and practice : lot splitting and operation overlapping issues

    NARCIS (Netherlands)

    Fernandes, Nuno O.; Land, Martin J.; Carmo-Silva, S.

    2016-01-01

    This paper addresses the problem of lot splitting in the context of workload control (WLC). Past studies on WLC assumed that jobs released to the shop floor proceed through the different stages of processing without being split. However, in practice, large jobs are often split into smaller transfer

  14. Emergency operation procedure navigation to avoid commission errors

    International Nuclear Information System (INIS)

    Gofuku, Akio; Ito, Koji

    2004-01-01

    New types of operation control system equipped with a large screen and CRT-based operation panels have been installed in newly constructed nuclear power plants. The operators can share important information of plant conditions by the large screen. The operation control system can know the operations by operators through the computers connected to the operation panels. The software switches placed in the CRT-based operation panels have a problem such that operators may make an error to manipulate an irrelevant software switch with their current operation. This study develops an operation procedure navigation technique to avoid this kind of commission errors. The system lies between CRT-based operation panels and plant control systems and checks an operation by operators if it follows the operation procedure of operation manuals. When the operation is a right one, the operation is executed as if the operation command is directly transmitted to control systems. If the operation does not follow the operation procedure, the system warns the commission error to operators. This paper describes the operation navigation technique, format of base operation model, and a proto-type operation navigation system for a three loop pressurized water reactor plant. The validity of the proto-type system is demonstrated by the operation procedure navigation for a steam generator tube rupture accident. (author)

  15. First and second order operator splitting methods for the phase field crystal equation

    International Nuclear Information System (INIS)

    Lee, Hyun Geun; Shin, Jaemin; Lee, June-Yub

    2015-01-01

    In this paper, we present operator splitting methods for solving the phase field crystal equation which is a model for the microstructural evolution of two-phase systems on atomic length and diffusive time scales. A core idea of the methods is to decompose the original equation into linear and nonlinear subequations, in which the linear subequation has a closed-form solution in the Fourier space. We apply a nonlinear Newton-type iterative method to solve the nonlinear subequation at the implicit time level and thus a considerably large time step can be used. By combining these subequations, we achieve the first- and second-order accuracy in time. We present numerical experiments to show the accuracy and efficiency of the proposed methods

  16. Operational procedures - industry observations and opportunities for improvement

    International Nuclear Information System (INIS)

    Davey, E.

    2003-01-01

    The purpose of this paper is to relate some of the commonly encountered problems with operational procedures in the nuclear industry and offer practical suggestions for their elimination. The paper is based on recent consultant experience in assisting industry clients with human performance related design and assessment initiatives. Operational procedures are a key part of an integrated system design. Procedures provide the specified instructions for actions people are to undertake in operating a facility to achieve production and safety goals. While organizations continue to make substantial investments in procedure development and maintenance, problems with procedures continue to occur, as evidenced through operating inefficiencies, errors, and events. The paper reviews the role procedures play in facility operations, comments on current development and maintenance practices, discusses the extent of human performance related problems attributed to procedure deficiencies, reviews commonly encountered problems with design and implementation of procedures, and offers suggestions on how some of these issues might be addressed in the future. (author)

  17. MITS Feed and Withdrawal Subsystem: operating procedures

    International Nuclear Information System (INIS)

    Brown, W.S.

    1980-01-01

    This procedure details the steps involved in establishing closed loop flows, providing UF 6 vapor to the FEED header of the Sampling Subsystem and returning it through the PRODUCT and TAILS headers via the F and W recycle valves. It is essentially a Startup Procedure

  18. New application of procedures computer to normal operating procedures

    Energy Technology Data Exchange (ETDEWEB)

    Medrano Carbajo, J.; Mendez Salguero, J.

    2012-07-01

    Currently, existing technologies in the operating power plants accused increasingly more problems of obsolescence and replacement of equipment supply. For this reason are spreading, to a greater or lesser extent, the projects of migration from analogue to digital technology systems. These systems, in line with the current situation of the industry, provide solutions to such problems and other advantages.

  19. 14 CFR 25.1585 - Operating procedures.

    Science.gov (United States)

    2010-01-01

    ...) Non-normal procedures for malfunction cases and failure conditions involving the use of special... envelopes, determined under § 25.251 must be furnished. The buffet onset envelopes presented may reflect the...

  20. Osteosynthesis techniques used for mandibular sagittal split osteotomy – history of orthognathic procedures and modern practice.

    Science.gov (United States)

    Nowak, Rafał; Trybek, Grzegorz

    Choosing an appropriate fixation technique after maxillary or mandibular osteotomy is one of the key factors affecting the success of orthognathic surgery. In line with the development of new surgical methods and techniques, the surgeons’ approach to the fixation of bone fragments has evolved accordingly, varying from non-fusion to different osteosynthesis techniques. Advances in medical sciences and medical technologies, have changed our attitudes to bone fragment reduction in orthopaedics and traumatology, and also in maxillofacial surgery. The pivotal underlying principle which determines bone healing – that is proper positioning so as to ensure appropriate contact area and immobilisation so as to ensure osteosynthesis – has remained unchanged for centuries. However, over the years, patient comfort and the predictability of treatment outcomes have vastly improved. The paper provides an overview of the techniques and methods used for the fixation of osteotomized fragments after bilateral sagittal split osteotomy since its introduction by Hugo Obwegeser up to the present day.

  1. Test report - caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1995-01-01

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ''Caustic Addition System Operability Test Procedure''. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  2. Solving the multiple-set split equality common fixed-point problem of firmly quasi-nonexpansive operators.

    Science.gov (United States)

    Zhao, Jing; Zong, Haili

    2018-01-01

    In this paper, we propose parallel and cyclic iterative algorithms for solving the multiple-set split equality common fixed-point problem of firmly quasi-nonexpansive operators. We also combine the process of cyclic and parallel iterative methods and propose two mixed iterative algorithms. Our several algorithms do not need any prior information about the operator norms. Under mild assumptions, we prove weak convergence of the proposed iterative sequences in Hilbert spaces. As applications, we obtain several iterative algorithms to solve the multiple-set split equality problem.

  3. Radiation dose to the operator during fluoroscopically guided spine procedures

    Energy Technology Data Exchange (ETDEWEB)

    Roccatagliata, Luca; Pravata, Emanuele; Cianfoni, Alessandro [Department of Neuroradiology, Neurocenter of Southern Switzerland, Ospedale Regionale di Lugano, Lugano (Switzerland); Presilla, Stefano [Unita di Fisica Medica, Ente Ospedaliero Cantonale (EOC), Bellinzona (Switzerland)

    2017-09-15

    Fluoroscopy is widely used to guide diagnostic and therapeutic spine procedures. The purpose of this study was to quantify radiation incident on the operator (operator Air Kerma) during a wide range of fluoroscopy-guided spine procedures and its correlation with the amount of radiation incident on the patient (Kerma Area Product - KAP). We retrospectively included 57 consecutive fluoroscopically guided spine procedures. KAP [Gy cm{sup 2}] and total fluoroscopy time were recorded for each procedure. An electronic dosimeter recorded the operator Air Kerma [μGy] for each procedure. Operator Air Kerma for each procedure, correlation between KAP and operator Air Kerma, and between KAP and fluoroscopy time was obtained. Operator Air Kerma was widely variable across procedures, with median value of 6.4 μGy per procedure. Median fluoroscopy time and median KAP per procedure were 2.6 min and 4.7 Gy cm{sup 2}, respectively. There was correlation between operator Air Kerma and KAP (r{sup 2} = 0.60), with a slope of 1.6 μGy Air Kerma per unit Gy cm{sup 2} KAP incident on the patient and between fluoroscopy time and KAP (r{sup 2} = 0.63). Operator Air Kerma during individual fluoroscopy-guided spine procedures can be approximated from the commonly and readily available information of the total amount of radiation incident on the patient, measured as KAP. (orig.)

  4. Research on Operating Procedure Development in View of RCM Theory

    International Nuclear Information System (INIS)

    Shi, J.

    2015-01-01

    The operation of NPPs (nuclear power plants) is closely related to SSCs (Structure, System and Component) function implementations and failure recoveries, and strictly follows operating procedure. The philosophy of RCM (Reliability Centered Maintenance) which is a widely-used systematic engineering approach in industry focusing on likewise facility functions and effectiveness of maintenance is accepted in relative analysis of NPPs operation in this paper. Based on the theory of RCM, the paper will discuss general logic of operating procedure development and framework optimization as well combining NPPs engineering design. Since the quality of operating procedures has a significant impact on the safe and reliable operation of NPPs, the paper provides a proposed operating procedure development logic diagramme for reference for the procedure optimization task ahead. (author)

  5. Transverse beam splitting made operational: Key features of the multiturn extraction at the CERN Proton Synchrotron

    Directory of Open Access Journals (Sweden)

    A. Huschauer

    2017-06-01

    Full Text Available Following a successful commissioning period, the multiturn extraction (MTE at the CERN Proton Synchrotron (PS has been applied for the fixed-target physics programme at the Super Proton Synchrotron (SPS since September 2015. This exceptional extraction technique was proposed to replace the long-serving continuous transfer (CT extraction, which has the drawback of inducing high activation in the ring. MTE exploits the principles of nonlinear beam dynamics to perform loss-free beam splitting in the horizontal phase space. Over multiple turns, the resulting beamlets are then transferred to the downstream accelerator. The operational deployment of MTE was rendered possible by the full understanding and mitigation of different hardware limitations and by redesigning the extraction trajectories and nonlinear optics, which was required due to the installation of a dummy septum to reduce the activation of the magnetic extraction septum. This paper focuses on these key features including the use of the transverse damper and the septum shadowing, which allowed a transition from the MTE study to a mature operational extraction scheme.

  6. Developing control room operator selection procedures

    International Nuclear Information System (INIS)

    Bosshardt, M.J.; Bownas, D.A.

    1979-01-01

    PDRI is performing a two-year study to identify the tasks performed and attributes required in electric power generating plant operating jobs, and focusing on the control room operator position. Approximately 65 investor-owned utilities are participating in the study

  7. ORNL Pocket Meter Program: internal operating procedures

    International Nuclear Information System (INIS)

    Berger, C.D.; Miller, J.H.; Dunsmore, M.R.

    1984-12-01

    The ORNL Pocket Meter Program is designed for auditing the approximate photon radiation exposure of Oak Ridge National Laboratory (ORNL) radiation workers. Although pocket meters are considered to be a secondary personnel dosimetry system at ORNL, they are valuable indicators of unplanned exposures if proper procedures are followed for testing, calibrating, deploying, wearing, processing, and recording data. 4 figures, 1 table

  8. Procedures of Operation at Cranbrook Central Library.

    Science.gov (United States)

    Cranbrook Institutions, Bloomfield Hills, MI. Central Library.

    This manual outlines the ordering, cataloging and classification, and processing procedures for books, periodicals, government documents, and non-book materials for a central library serving three schools--a co-ed elementary school and separate junior-senior high schools for boys and girls--and four special libraries--a fine and rare books…

  9. MITS Feed and Withdrawal Subsystem: operating procedures

    International Nuclear Information System (INIS)

    Brown, W.S.

    1980-01-01

    This procedure details the steps involved in filling two of the four MITS (Machine Interface Test System) Feed and Withdrawal subsystem main traps and the Sample/Inventory Make-up Pipette with uranium hexafluoride from the ''AS RECEIVED'' UF 6 supply

  10. Guideline for the preparation of safe operating procedures

    International Nuclear Information System (INIS)

    Stinnett, L.; Armbrust, E.F.; Christy, V.W.; Doyle, J.R.; Kesinger, J.H.

    1977-03-01

    Sandia Laboratories Safe Operating Procedures (SOP) are written for activities which involve the use of explosives, dangerous chemicals, radioactive materials, hazardous systems, and certain types of operational facilities which present hazards. This guideline presents a suggested SOP format

  11. Operating procedures: Fusion Experiments Analysis Facility

    Energy Technology Data Exchange (ETDEWEB)

    Lerche, R.A.; Carey, R.W.

    1984-03-20

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility.

  12. Operating procedures: Fusion Experiments Analysis Facility

    International Nuclear Information System (INIS)

    Lerche, R.A.; Carey, R.W.

    1984-01-01

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility

  13. Operating experience and procedures at the tritium systems test assembly

    International Nuclear Information System (INIS)

    Carlson, R.V.; Binning, K.E.; Cole, S.P.; Jenkins, E.M.; Wilhelm, R.C.; Cole, S.P.

    1988-01-01

    Operating procedures are important for the safe and efficient operation of the Tritium Systems Test Assembly (TSTA). TSTA has been operating for four years with tritium in a safe and efficient manner. The inventory of tritium in the process loop is 100 grams and several milestone runs have been completed. This paper describes the methods used to operate TSTA. 3 refs., 1 fig

  14. Standard Operating Procedure for Accelerated Corrosion Testing at ARL

    Science.gov (United States)

    2017-11-01

    ARL-TN-0855 ● NOV 2017 US Army Research Laboratory Standard Operating Procedure for Accelerated Corrosion Testing at ARL by... Corrosion Testing at ARL by Thomas A Considine Weapons and Materials Research Directorate, ARL Approved for public...November 2017 2. REPORT TYPE Technical Note 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Standard Operating Procedure for Accelerated

  15. Operating procedures for the Pajarito Site Critical Assembly Facility

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1983-03-01

    Operating procedures consistent with DOE Order 5480.2, Chapter VI, and the American National Standard Safety Guide for the Performance of Critical Experiments are defined for the Pajarito Site Critical Assembly Facility of the Los Alamos National Laboratory. These operating procedures supersede and update those previously published in 1973 and apply to any criticality experiment performed at the facility

  16. Optimization of PHEV Power Split Gear Ratio to Minimize Fuel Consumption and Operation Cost

    Science.gov (United States)

    Li, Yanhe

    A Plug-in Hybrid Electric Vehicle (PHEV) is a vehicle powered by a combination of an internal combustion engine and an electric motor with a battery pack. The battery pack can be charged by plugging the vehicle to the electric grid and from using excess engine power. The research activity performed in this thesis focused on the development of an innovative optimization approach of PHEV Power Split Device (PSD) gear ratio with the aim to minimize the vehicle operation costs. Three research activity lines have been followed: • Activity 1: The PHEV control strategy optimization by using the Dynamic Programming (DP) and the development of PHEV rule-based control strategy based on the DP results. • Activity 2: The PHEV rule-based control strategy parameter optimization by using the Non-dominated Sorting Genetic Algorithm (NSGA-II). • Activity 3: The comprehensive analysis of the single mode PHEV architecture to offer the innovative approach to optimize the PHEV PSD gear ratio.

  17. Tensor-Train Split-Operator Fourier Transform (TT-SOFT) Method: Multidimensional Nonadiabatic Quantum Dynamics.

    Science.gov (United States)

    Greene, Samuel M; Batista, Victor S

    2017-09-12

    We introduce the "tensor-train split-operator Fourier transform" (TT-SOFT) method for simulations of multidimensional nonadiabatic quantum dynamics. TT-SOFT is essentially the grid-based SOFT method implemented in dynamically adaptive tensor-train representations. In the same spirit of all matrix product states, the tensor-train format enables the representation, propagation, and computation of observables of multidimensional wave functions in terms of the grid-based wavepacket tensor components, bypassing the need of actually computing the wave function in its full-rank tensor product grid space. We demonstrate the accuracy and efficiency of the TT-SOFT method as applied to propagation of 24-dimensional wave packets, describing the S 1 /S 2 interconversion dynamics of pyrazine after UV photoexcitation to the S 2 state. Our results show that the TT-SOFT method is a powerful computational approach for simulations of quantum dynamics of polyatomic systems since it avoids the exponential scaling problem of full-rank grid-based representations.

  18. Operational limits and conditions and operating procedures for research reactors. Safety guide

    International Nuclear Information System (INIS)

    2008-01-01

    This publication provides practical guidance on all important aspects of developing, formulating and presenting the operational limits and conditions as well as the operating procedures for research reactors. It covers the concept of operational limits and conditions, their content, and the responsibilities of the operating organization with respect to their establishment, modification, documentation and compliance. The guidance also covers the training of operating personnel on performing periodic testing, established by the operational limits and conditions, and operating procedures

  19. Operating Procedures to Identify Wastes of Decommissioning

    International Nuclear Information System (INIS)

    Gatea, M.A.

    2016-01-01

    There are a number of sites in Iraq which have been used for nuclear activities and which contain potentially significant amounts of radioactive material. Many of these sites suffered substantial physical damage during the Gulf Wars as well as the challenging of the difficult security situation in the country.The destruction of the former nuclear facilities during the 1991 Gulf war aggravated the problem. As a result of these events, many of these nuclear facilities have lost their containment of the radioactive material and it now has an increased potential to be dispersed into the environment.Iraqi Decommissioning Directorate (IDD) is one of the Ministry of Science and Technology (MoST) formations. It deals with decommissioning of former Iraqi nuclear sites. It considers a producer of radioactive waste.Therefore, waste management represents the vital requirement to work accomplishment.The work carries out on-site waste pretreatment which considers as a minimization of waste management.W M is necessary to: Segregate 'at source' as much materials as possible to minimize quantities of radioactive waste, clear or exempt as much materials as possible and decontaminate and recycle as much radioactive waste as possible. And in more general terms: to control and account for radioactive waste to protect human health and the environment, to make sure we do not leave unnecessary burdens for future generations, to concentrate, contain and isolate the waste from the environment therefore, this make any releases to the environment to be restricted and subject to regulatory control.This procedure applies on-site waste pretreatment which comprises segregating, characterizing, minimizing, classifying, packaging and relocating of generated wastes during decommissioning of destroyed nuclear facilities. The stationary waste treatment activities are the responsibility of RWTD/MoST.The (RPC/MoE) is the national regulatory body during the whole radioactive waste management

  20. Application of the operator splitting to the Maxwell equations with the source term

    NARCIS (Netherlands)

    Bochev, Mikhail A.; Faragó, I.; Horváth, R.

    Motivated by numerical solution of the time-dependent Maxwell equations, we consider splitting methods for a linear system of differential equations $w'(t)=Aw(t)+f(t),$ $A\\in\\mathbb{R}^{n\\times n}$ split into two subproblems $w_1'(t)=A_1w_1(t)+f_1(t)$ and $w_2'(t)=A_2w_2(t)+f_2(t),$ $A=A_1+A_2,$

  1. Operator coil monitoring Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software's ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ''ENABLE'' and ''DISABLE'' controls from the Master and RSS stations function correctly, and only with the use of proper passwords

  2. Body Mass Index and Operating Times in Vascular Procedures

    Directory of Open Access Journals (Sweden)

    M. Durup-Dickenson

    Full Text Available : Introduction: The influence of body mass index (BMI on operating times in central and peripheral vascular surgical procedures was investigated. Report: A national cohort of Danish patients who underwent a vascular procedure between 1983 and 2012 was used for analysis. Data were analysed with pairwise comparisons of BMI groups for operating times using the independent samples Kruskall–Wallis test. Discussion: A total of 3,255 carotid endarterectomies; 6,885 central vascular procedures; and 4,488 peripheral bypasses were included for the analysis. Median operating times for carotid endarterectomy and central vascular procedures were, respectively, 5 and 15 minutes longer in obese patients than in normal weight patients. This represents a 7% and 10% increase in median operating times, respectively. Linear and multi-adjusted linear regressions were conducted adjusting for confounders, showing a significant correlation between BMI and operating time. Obesity significantly increased the operating times in carotid endarterectomy and central vascular procedures. These may have ramifications for the individual operative stress but not necessarily on logistical operation planning. Keywords: Body mass index (BMI, Obesity, Operating time, Surgery, Vascular surgical procedures

  3. Operating procedure automation to enhance safety of nuclear power plants

    International Nuclear Information System (INIS)

    Husseiny, A.A.; Sabri, Z.A.; Adams, S.K.; Rodriguez, R.J.; Packer, D.; Holmes, J.W.

    1989-01-01

    Use of logic statements and computer assist are explored as means for automation and improvement on design of operating procedures including those employed in abnormal and emergency situations. Operating procedures for downpower and loss of forced circulation are used for demonstration. Human-factors analysis is performed on generic emergency operating procedures for three strategies of control; manual, semi-automatic and automatic, using standard emergency operating procedures. Such preliminary analysis shows that automation of procedures is feasible provided that fault-tolerant software and hardware become available for design of the controllers. Recommendations are provided for tests to substantiate the promise of enhancement of plant safety. Adequate design of operating procedures through automation may alleviate several major operational problems of nuclear power plants. Also, automation of procedures is necessary for partial or overall automatic control of plants. Fully automatic operations are needed for space applications while supervised automation of land-based and offshore plants may become the thrust of new generation of nulcear power plants. (orig.)

  4. Analysis of operator splitting errors for near-limit flame simulations

    Energy Technology Data Exchange (ETDEWEB)

    Lu, Zhen; Zhou, Hua [Center for Combustion Energy, Tsinghua University, Beijing 100084 (China); Li, Shan [Center for Combustion Energy, Tsinghua University, Beijing 100084 (China); School of Aerospace Engineering, Tsinghua University, Beijing 100084 (China); Ren, Zhuyin, E-mail: zhuyinren@tsinghua.edu.cn [Center for Combustion Energy, Tsinghua University, Beijing 100084 (China); School of Aerospace Engineering, Tsinghua University, Beijing 100084 (China); Lu, Tianfeng [Department of Mechanical Engineering, University of Connecticut, Storrs, CT 06269-3139 (United States); Law, Chung K. [Center for Combustion Energy, Tsinghua University, Beijing 100084 (China); Department of Mechanical and Aerospace Engineering, Princeton University, Princeton, NJ 08544 (United States)

    2017-04-15

    High-fidelity simulations of ignition, extinction and oscillatory combustion processes are of practical interest in a broad range of combustion applications. Splitting schemes, widely employed in reactive flow simulations, could fail for stiff reaction–diffusion systems exhibiting near-limit flame phenomena. The present work first employs a model perfectly stirred reactor (PSR) problem with an Arrhenius reaction term and a linear mixing term to study the effects of splitting errors on the near-limit combustion phenomena. Analysis shows that the errors induced by decoupling of the fractional steps may result in unphysical extinction or ignition. The analysis is then extended to the prediction of ignition, extinction and oscillatory combustion in unsteady PSRs of various fuel/air mixtures with a 9-species detailed mechanism for hydrogen oxidation and an 88-species skeletal mechanism for n-heptane oxidation, together with a Jacobian-based analysis for the time scales. The tested schemes include the Strang splitting, the balanced splitting, and a newly developed semi-implicit midpoint method. Results show that the semi-implicit midpoint method can accurately reproduce the dynamics of the near-limit flame phenomena and it is second-order accurate over a wide range of time step size. For the extinction and ignition processes, both the balanced splitting and midpoint method can yield accurate predictions, whereas the Strang splitting can lead to significant shifts on the ignition/extinction processes or even unphysical results. With an enriched H radical source in the inflow stream, a delay of the ignition process and the deviation on the equilibrium temperature are observed for the Strang splitting. On the contrary, the midpoint method that solves reaction and diffusion together matches the fully implicit accurate solution. The balanced splitting predicts the temperature rise correctly but with an over-predicted peak. For the sustainable and decaying oscillatory

  5. Radiation exposure of operator during various interventional procedures

    International Nuclear Information System (INIS)

    Yu, In Kyu; Chung, Jin Wook; Han, Joon Koo; Park, Jae Hyung; Kang, Wee Saing

    1994-01-01

    To investigate the levels of radiation exposure of an operator which may be influenced by the wearing an apron, type of procedure, duration of fluoroscopy and operator's skill during various interventional procedures. Radiation doses were measured both inside and outside the apron(0.5 mm lead equivalent) of the operator by a film badge monitoring method and the duration of fluoroscopy was measured in 96 procedures prospectively. The procedures were 30 transcatheter arterial embolization (TAE), 25 percutaneous transhepatic biliary drainages (PTBD), 16 stone removals (SR), 15 percutaneous needle aspirations (PNCA) and 10 percutaneous nephrostomies(PCN). To assess the difference of exposure by the operator's skill, the procedures of TAE and PTBD were done separately by groups of staffs and residents. Average protective effect of the apron was 72.8%. Average radiation exposure(unit: μ Sv/procedure was 23.3 in PTBD by residents, 10.0 in PTBD by staffs, 10.0 in SR, 8.7 in TAE by residents, 7.3 in TAE by staffs, 9.0 in PCN and 6.0 in PCNA. Average radiation exposure of residents were 1.9 times greater than those of staffs. Radiation exposure was not proportionally related to the duration of fluoroscopy, but influenced by wearing an apron, various types of procedure and operator's skills

  6. The operational procedure of an electron beam accelerator

    International Nuclear Information System (INIS)

    Lee, Byung Cheol; Choi, Hwa Lim; Yang, Ki Ho; Han, Young Hwan; Kim, Sung Chan

    2008-12-01

    The KAERI(Korea Atomic Energy of Research Institute) high-power electron beam irradiation facility, operating at the energies between 0.3 MeV and 10 MeV, has provided irradiation services to users in industries, universities, and institute in various fields. This manual is for the operation of an electron beam which is established in KAERI, and describes elementary operation procedures of electron beam between 0.3 Mev and 10 MeV. KAERI Electron Accelerator facility(Daejeon, Korea) consists of two irradiators: one is a low-energy electron beam irradiator operated by normal conducting RF accelerator, the other is medium-energy irradiator operated by superconducting RF accelerator. We explain the check points of prior to operation, operation procedure of this facility and the essential parts of electron beam accelerator

  7. The operational procedure of an electron beam accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byung Cheol; Choi, Hwa Lim; Yang, Ki Ho; Han, Young Hwan; Kim, Sung Chan

    2008-12-15

    The KAERI(Korea Atomic Energy of Research Institute) high-power electron beam irradiation facility, operating at the energies between 0.3 MeV and 10 MeV, has provided irradiation services to users in industries, universities, and institute in various fields. This manual is for the operation of an electron beam which is established in KAERI, and describes elementary operation procedures of electron beam between 0.3 Mev and 10 MeV. KAERI Electron Accelerator facility(Daejeon, Korea) consists of two irradiators: one is a low-energy electron beam irradiator operated by normal conducting RF accelerator, the other is medium-energy irradiator operated by superconducting RF accelerator. We explain the check points of prior to operation, operation procedure of this facility and the essential parts of electron beam accelerator.

  8. Cost, operation and hospitalization times in distraction osteogenesis versus sagittal split osteotomy

    NARCIS (Netherlands)

    van Strijen, P. J.; Breuning, K. H.; Becking, A. G.; Perdijk, F. B. T.; Tuinzing, D. B.

    2003-01-01

    Distraction osteogenesis in 'common' surgical orthodontics is mentioned as an alternative for conventional sagittal split osteotomy. After a 'learning curve' in the surgical skills of distraction, the two techniques can be compared concerning time and cost aspects. Forty-seven patients (male n=28,

  9. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  10. Acquisition of Formal Operations: The Effects of Two Training Procedures.

    Science.gov (United States)

    Rosenthal, Doreen A.

    1979-01-01

    A study of 11- and 12-year-old girls indicates that either of two training procedures, method training or dimension training, can aid in the transition from concrete operational to formal operational thought by promoting a hypothesis-testing attitude. (BH)

  11. 40 CFR 160.81 - Standard operating procedures.

    Science.gov (United States)

    2010-07-01

    .... (10) Data handling, storage and retrieval. (11) Maintenance and calibration of equipment. (12... GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.81 Standard operating procedures... test, control, and reference substances. (4) Test system observations. (5) Laboratory or other tests...

  12. Supporting plant operation through computer-based procedures

    International Nuclear Information System (INIS)

    Martinez, Victor; Medrano, Javier; Mendez, Julio

    2014-01-01

    Digital Systems are becoming more important in controlling and monitoring nuclear power plant operations. The capabilities of these systems provide additional functions as well as support operators in making decisions and avoiding errors. Regarding Operation Support Systems, an important way of taking advantage of these features is using computer-based procedures (CBPs) tools that enhance the plant operation. Integrating digital systems in analogue controls at nuclear power plants in operation becomes an extra challenge, in contrast to the integration of Digital Control Systems in new nuclear power plants. Considering the potential advantages of using this technology, Tecnatom has designed and developed a CBP platform taking currently operating nuclear power plants as its design basis. The result is a powerful tool which combines the advantages of CBPs and the conventional analogue control systems minimizing negative effects during plant operation and integrating operation aid-systems to support operators. (authors)

  13. Extension of emergency operating procedures for severe accident management

    International Nuclear Information System (INIS)

    Chiang, S.C.

    1992-01-01

    To enhance the capability of reactor operators to cope with the hypothetical severe accident its the key issue for utilities. Taiwan Power Company has started the enhancement programs on extension of emergency operating procedures (EOPs). It includes the review of existing LOPs based on the conclusions and recommendations of probabilistic risk assessment studies to confirm the operator actions. Then the plant specific analysis for accident management strategy will be performed and the existing EOPs will be updated accordingly

  14. Operating procedures for emergency situations in EDF PWR plants

    International Nuclear Information System (INIS)

    Depond, G.; Resse, L.

    1992-01-01

    Analysis of incidents and accidents occurring at French and foreign power plants - particularly the TMI accident - and the commissioning of many units in France, as well as tests on simulators, have all demonstrated that an improvement of safety in nuclear power units depends largely on the improvement of the man-machine interface and particularly of emergency operating procedures (EOP). EDF has taken numerous actions in this direction, especially since 1979. First of all, in improving the classical approach based on event-oriented procedures: Rewriting of initial accident operating procedures with regard to their technical contents their form, and the organization of the operating team (procedures I and A); Extension of initial procedures into areas at the limits of design basis and beyond the design basis limits (procedures H). Nevertheless, this approach is subject to several weaknesses. Dependence on a precise initial diagnosis, impossibility to take into account all the conceivable accidental situations, discrepancies between the predicted pattern and the reality. These drawbacks of the event approach have led us to revise the technical conception of the EOPs, and to develop a new approach based on a continuous monitoring of the physical states of the plant and the ability to define a relationship between the physical state of the plant and the operator actions. (author). 4 figs

  15. The European Stroke Organisation Guidelines: a standard operating procedure

    DEFF Research Database (Denmark)

    Ntaios, George; Bornstein, Natan M; Caso, Valeria

    2015-01-01

    pace with this progress and driven by the strong determination of the European Stroke Organisation to further promote stroke management, education, and research, the European Stroke Organisation decided to delineate a detailed standard operating procedure for its guidelines. There are two important...... cornerstones in this standard operating procedure: The first is the implementation of the Grading of Recommendations Assessment, Development, and Evaluation methodology for the development of its Guideline Documents. The second one is the decision of the European Stroke Organisation to move from the classical...... and significant input from European Stroke Organisation members as well as methodologists and analysts, this document presents the official standard operating procedure for the development of the Guideline Documents of the European Stroke Organisation....

  16. The development of symptoms-oriented operating procedures

    International Nuclear Information System (INIS)

    Colquhoun, R.

    1983-04-01

    Until recently the formal treatment of control room procedures for nuclear power plant upset conditions has been event-oriented. The demise of Three Mile Island, Unit 2, caused the American industry to recognize the pitfalls inherent in relying totally on event-oriented procedures, and led to the initiation of a program for the development of a symptoms-oriented approach for handling upset conditions. The U.S. program has been independently paralleled by a Canadian program. This paper describes the development of the Canadian symptoms-oriented philosophy and identifies the relevance of a generic symptoms based emergency procedure to current operating practices

  17. Operational test procedure for Bldg 241-A-701 air compressor

    International Nuclear Information System (INIS)

    Desantis, G.N.

    1995-01-01

    This document is an Operability Test Procedure (OTP) which will verify and record that the 241-A-701 air compressor and associated equipment operates within their intended design parameters. The activities defined in this OTP will be performed to ensure the daily operation of the new compressed air system can be reliable and efficient. The Compressed Air System (CAS) for 241-A-701 supplies process and instrument air to the A, AX, AY, and AZ tank farms. The primary use of the CAS is for tank farms instrumentation, air operated valves, and air lift circulators

  18. Modeling vehicle operating speed on urban roads in Montreal: a panel mixed ordered probit fractional split model.

    Science.gov (United States)

    Eluru, Naveen; Chakour, Vincent; Chamberlain, Morgan; Miranda-Moreno, Luis F

    2013-10-01

    Vehicle operating speed measured on roadways is a critical component for a host of analysis in the transportation field including transportation safety, traffic flow modeling, roadway geometric design, vehicle emissions modeling, and road user route decisions. The current research effort contributes to the literature on examining vehicle speed on urban roads methodologically and substantively. In terms of methodology, we formulate a new econometric model framework for examining speed profiles. The proposed model is an ordered response formulation of a fractional split model. The ordered nature of the speed variable allows us to propose an ordered variant of the fractional split model in the literature. The proposed formulation allows us to model the proportion of vehicles traveling in each speed interval for the entire segment of roadway. We extend the model to allow the influence of exogenous variables to vary across the population. Further, we develop a panel mixed version of the fractional split model to account for the influence of site-specific unobserved effects. The paper contributes substantively by estimating the proposed model using a unique dataset from Montreal consisting of weekly speed data (collected in hourly intervals) for about 50 local roads and 70 arterial roads. We estimate separate models for local roads and arterial roads. The model estimation exercise considers a whole host of variables including geometric design attributes, roadway attributes, traffic characteristics and environmental factors. The model results highlight the role of various street characteristics including number of lanes, presence of parking, presence of sidewalks, vertical grade, and bicycle route on vehicle speed proportions. The results also highlight the presence of site-specific unobserved effects influencing the speed distribution. The parameters from the modeling exercise are validated using a hold-out sample not considered for model estimation. The results indicate

  19. ARM Operations and Engineering Procedure Mobile Facility Site Startup

    Energy Technology Data Exchange (ETDEWEB)

    Voyles, Jimmy W

    2015-05-01

    This procedure exists to define the key milestones, necessary steps, and process rules required to commission and operate an Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF), with a specific focus toward on-time product delivery to the ARM Data Archive. The overall objective is to have the physical infrastructure, networking and communications, and instrument calibration, grooming, and alignment (CG&A) completed with data products available from the ARM Data Archive by the Operational Start Date milestone.

  20. Symptom-based emergency operating procedures development for Ignalina NPP

    International Nuclear Information System (INIS)

    Kruglov, Y.

    1999-01-01

    In this paper and lecture are presented: (1) Introduction; (2) EOP project work stages and documentation; (3) Selection and justification of accident management strategy; (4) Content of EOP package; (5) Development of EOP package; (6) EOP package verification; (7) EOP package validation; (8) EOP training; (9) EOP implementation; (10) Conditions of symptom-based emergency operating producers package application and its interconnection with event-based emergency operating procedures; (11) Rules of EOP application; EOP maintenance

  1. 42 CFR 35.15 - Consent to operative procedures.

    Science.gov (United States)

    2010-10-01

    ... emergencies when the patient is physically or mentally incapable of consenting and the delay required to... operative procedure shall be undertaken unless the patient or, in the case of a minor or incompetent, his... or refusal of consent shall be made a part of the clinical record. ...

  2. Coping with Unanticipated Accidents using Emergency Operating Procedures

    International Nuclear Information System (INIS)

    Kim, Yochan; Jung, Wondea

    2013-01-01

    In, unsafe acts associated with a literal following of a procedure were reported. A report of the Fukushima accident also revealed that a tendency to adhere to procedures and prior practices can impede applying effective countermeasures. To overcome the conflicts between benefit and jeopardy of procedures during unanticipated accidents, we reviewed the literature on the perspectives of cognitive engineering and artificial intelligence. From the insights about human planning of the literatures, we also proposed an approach of how to train operators to effectively use EOPs during unanticipated accidents. There are three key processes required to effectively cope with emergency situations: how correctly the operators are aware of the occurring situations, how properly they develop corresponding plans for the situations, and how accurately they execute the plans. This paper presents a way to develop the plans using EOPs from some literature of human planning. Even if professional operators have implicitly shaped good structures of procedures already, it is expected that this approach will provide a more systematic and concrete training strategy. If the operators are trained with this strategy, a higher level of human reliability would be ensured in unanticipated accidents

  3. Emergency operating procedure upgrade program and audit results

    International Nuclear Information System (INIS)

    Graham, P.D.

    1989-01-01

    This paper describes the method and results of upgrading the River Bend station boiling water reactor 6 emergency operating procedures (EOPs). The upgrade program replaced difficult-to-implement narrative procedures with well-developed flowcharts. The flowcharts eliminate a number of human factors problems, are user friendly, provide for easy implementation, and provide technical information in a clear, concise format. Positive results were seen immediately. The operating crews found the flowcharts to be clear, understandable, and usable. Simulator training and EOP implementation became something that the operators no longer dreaded, and their confidence in their ability to control emergency situations was greatly improved. The paper provides a summary of the EOP upgrade program

  4. Circuit model optimization of a nano split ring resonator dimer antenna operating in infrared spectral range

    International Nuclear Information System (INIS)

    Gneiding, N.; Zhuromskyy, O.; Peschel, U.; Shamonina, E.

    2014-01-01

    Metamaterials are comprised of metallic structures with a strong response to incident electromagnetic radiation, like, for example, split ring resonators. The interaction of resonator ensembles with electromagnetic waves can be simulated with finite difference or finite elements algorithms, however, above a certain ensemble size simulations become inadmissibly time or memory consuming. Alternatively a circuit description of metamaterials, a well developed modelling tool at radio and microwave frequencies, allows to significantly increase the simulated ensemble size. This approach can be extended to the IR spectral range with an appropriate set of circuit element parameters accounting for physical effects such as electron inertia and finite conductivity. The model is verified by comparing the coupling coefficients with the ones obtained from the full wave numerical simulations, and used to optimize the nano-antenna design with improved radiation characteristics.

  5. Surgical site infections in paediatric otolaryngology operative procedures.

    Science.gov (United States)

    Ifeacho, S N; Bajaj, Y; Jephson, C G; Albert, D M

    2012-07-01

    An assessment of the rate of surgical site infections associated with elective paediatric otolaryngology surgical procedures. Prospective data was collected for a 3-week period for all children undergoing surgery where either mucosa or skin was breached. The parents of the children were requested to complete a questionnaire at 30 days after the operation. Data was collected on 80 consecutive cases. The majority of cases were admitted on the day of the procedure. The procedures included adenotonsillectomy (24), grommets (12), cochlear implantation (6), bone-anchored hearing aid (2), submandibular gland excision (1), branchial sinus excision (1), cystic hygroma excision (3), nasal glioma excision (1), microlaryngobronchoscopy (13), tracheostomy (3) and other procedures (14). Nearly half the cases had more than one operation done at the same time. 26/80 (32.5%) patients had a temporary or permanent implant inserted at the time of operation (grommet, bone-anchored hearing aid, cochlear implant). 25/80 (31%) operative fields were classed as clean and 55/80 (68.7%) as clean contaminated operations. The duration of the operation varied from 6 min to 142 min. Hospital antibiotic protocol was adhered to in 69/80 (86.3%) cases but not in 11/80 cases. In our series, 3/80 (3.7%) patients had an infection in the postoperative period. Surgical site infections do occur at an appreciable rate in paediatric otolaryngology. With the potential for serious consequences, reduction in the risk of surgical site infections is important. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  6. Operator behaviors observed in following emergency operating procedure under a simulated emergency

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Park, Jin Kyun

    2012-01-01

    A symptom-based procedure with a critical safety function monitoring system has been established to reduce the operator's diagnosis and cognitive burden since the Three-Mile Island (TMI) accident. However, it has been reported that a symptom-based procedure also requires an operator's cognitive efforts to cope with off-normal events. This can be caused by mismatches between a static model, an emergency operating procedure (EOP), and a dynamic process, the nature of an ongoing situation. The purpose of this study is to share the evidence of mismatches that may result in an excessive cognitive burden in conducting EOPs. For this purpose, we analyzed simulated emergency operation records and observed some operator behaviors during the EOP operation: continuous steps, improper description, parameter check at a fixed time, decision by information previously obtained, execution complexity, operation by the operator's knowledge, notes and cautions, and a foldout page. Since observations in this study are comparable to the results of an existing study, it is expected that the operational behaviors observed in this study are generic features of operators who have to cope with a dynamic situation using a static procedure.

  7. Embryo splitting

    Directory of Open Access Journals (Sweden)

    Karl Illmensee

    2010-04-01

    Full Text Available Mammalian embryo splitting has successfully been established in farm animals. Embryo splitting is safely and efficiently used for assisted reproduction in several livestock species. In the mouse, efficient embryo splitting as well as single blastomere cloning have been developed in this animal system. In nonhuman primates embryo splitting has resulted in several pregnancies. Human embryo splitting has been reported recently. Microsurgical embryo splitting under Institutional Review Board approval has been carried out to determine its efficiency for blastocyst development. Embryo splitting at the 6–8 cell stage provided a much higher developmental efficiency compared to splitting at the 2–5 cell stage. Embryo splitting may be advantageous for providing additional embryos to be cryopreserved and for patients with low response to hormonal stimulation in assisted reproduction programs. Social and ethical issues concerning embryo splitting are included regarding ethics committee guidelines. Prognostic perspectives are presented for human embryo splitting in reproductive medicine.

  8. Operability test procedure [Tank] 241-SY-101 equipment removal system

    International Nuclear Information System (INIS)

    Mast, J.C.

    1994-01-01

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation

  9. The plant operating procedure information modeling system for creation and maintenance of procedures

    International Nuclear Information System (INIS)

    Fanto, S.V.; Petras, D.S.; Reiner, R.T.; Frost, D.R.; Orendi, R.G.

    1990-01-01

    This paper reports that as a result of the accident at Three Mile Island, regulatory requirements were issued to upgrade Emergency Operating Procedures for nuclear power plants. The use of human-factored, function-oriented, EOPs were mandated to improve human reliability and to mitigate the consequences of a broad range of initiating events, subsequent failures and operator errors, without having to first diagnose the specific events. The Westinghouse Owners Group responded by developing the Emergency Response Guidelines in a human-factored, two-column format to aid in the transfer of the improved technical information to the operator during transients and accidents. The ERGs are a network of 43 interrelated guidelines which specify operator actions to be taken during plant emergencies to restore the plant to a safe and stable condition. Each utility then translates these guidelines into plant specific EOPs. The creation and maintenance of this large web of interconnecting ERGs/EOPs is an extremely complex task. This paper reports that in order to aid procedure documentation specialists with this time-consuming and tedious task, the Plant Operating Procedure Information Modeling system was developed to provide a controlled and consistent means to build and maintain the ERGs/EOPs and their supporting documentation

  10. Procedure for following external nuclear power plant operating experience

    International Nuclear Information System (INIS)

    Kostadinov, V.

    2003-01-01

    Slovenian Nuclear Safety Administration (SNSA) has developed computer database and the procedure for following-up and investigating external nuclear operating experience and administrative requirements. The SNSA's primary goal is to investigate safety significant events in due time, to analyze them from the regulatory point of view and to ensure that meaningful lessons be learned and used for improvement of the safe operation of Slovenian Nuclear Power Plant Krsko. Moreover, we intend to make uniform format and method for reporting broader spectrum of events analyzed including low level event reporting. (author)

  11. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  12. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  13. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  14. The design of operating procedures manuals for nuclear power plants

    International Nuclear Information System (INIS)

    Bohr, E.; Preuss, W.; Reinartz, G.; Thau, G.

    1977-03-01

    This report describes the findings of a research on the desirable design of operating procedures manuals for nuclear power plants. The work was supported by a grant of the Federal Department of the Interior. Information was acquired from different sources. Interviews and discussions on manual design were carried out with manual users in nuclear power plants. Moreover, tasks carried out using procedures were either observed or, alternatively, the manner of using procedures was elicited by interviews. In addition, manual writers, managers from manufacturers and utilities, nuclear experts, and individuals involved in manual specification activities were interviewed. A major source of information has been the pertinent scientific and technical findings scattered in the literature on topics such as instructional technology, engineering psychology, psycholinguistics, and typography. A comprehensive bibliography is included. General rules are established on designing instructional material for use on the job, aiming at increasing their legability, comprehensibility, and suitability to guide human performance. The application of these rules to the design of individual operating procedures is demonstrated. Recommendations are given on the design, layout, development and implementation of manuals. (orig.) [de

  15. Surveillance procedure for the rotary drilling operations of a well

    Energy Technology Data Exchange (ETDEWEB)

    Peltier, B; Deshais, R

    1988-06-17

    A surveillance procedure for the rotary drilling operations of a well is proposed. When the drilling pipe is drawn out of the well, or put into the well, pipe elements are taken away or added. At each moment the height of the trepan in the well is measured, together with the traction force of the lifting engine. The device permits to avoid the important damage that can be caused by an error on the drilling pipe's length.

  16. Surveillance procedure for the rotary drilling operations of a well

    Energy Technology Data Exchange (ETDEWEB)

    Peltier, B.; Deshais, R.

    1988-06-17

    A surveillance procedure for the rotary drilling operations of a well is proposed. When the drilling pipe is drawn out of the well, or put into the well, pipe elements are taken away or added. At each moment the height of the trepan in the well is measured, together with the traction force of the lifting engine. The device permits to avoid the important damage that can be caused by an error on the drilling pipe's length.

  17. Flowchart-format emergency operating procedures-strengths and weaknesses

    International Nuclear Information System (INIS)

    Barnes, V.E.; Bongarra, J.P. Jr.

    1989-01-01

    An increasing number of nuclear power plant licensees are converting their text-format emergency operating procedures (EOPs) to flowcharts. Findings of a recent study of the flowchart-format EOPs indicate that the flowchart format appears to solve several significant usability problems associated with text-format EOPs, but also introduces other types of usability concerns. This paper discusses some of the strengths and weaknesses of the flowchart format for presenting EOPs

  18. An operational procedure for rapid flood risk assessment in Europe

    Science.gov (United States)

    Dottori, Francesco; Kalas, Milan; Salamon, Peter; Bianchi, Alessandra; Alfieri, Lorenzo; Feyen, Luc

    2017-07-01

    The development of methods for rapid flood mapping and risk assessment is a key step to increase the usefulness of flood early warning systems and is crucial for effective emergency response and flood impact mitigation. Currently, flood early warning systems rarely include real-time components to assess potential impacts generated by forecasted flood events. To overcome this limitation, this study describes the benchmarking of an operational procedure for rapid flood risk assessment based on predictions issued by the European Flood Awareness System (EFAS). Daily streamflow forecasts produced for major European river networks are translated into event-based flood hazard maps using a large map catalogue derived from high-resolution hydrodynamic simulations. Flood hazard maps are then combined with exposure and vulnerability information, and the impacts of the forecasted flood events are evaluated in terms of flood-prone areas, economic damage and affected population, infrastructures and cities.An extensive testing of the operational procedure has been carried out by analysing the catastrophic floods of May 2014 in Bosnia-Herzegovina, Croatia and Serbia. The reliability of the flood mapping methodology is tested against satellite-based and report-based flood extent data, while modelled estimates of economic damage and affected population are compared against ground-based estimations. Finally, we evaluate the skill of risk estimates derived from EFAS flood forecasts with different lead times and combinations of probabilistic forecasts. Results highlight the potential of the real-time operational procedure in helping emergency response and management.

  19. Optimization of operating parameters for gas-phase photocatalytic splitting of H2S by novel vermiculate packed tubular reactor.

    Science.gov (United States)

    Preethi, V; Kanmani, S

    2016-10-01

    Hydrogen production by gas-phase photocatalytic splitting of Hydrogen Sulphide (H2S) was investigated on four semiconductor photocatalysts including CuGa1.6Fe0.4O2, ZnFe2O3, (CdS + ZnS)/Fe2O3 and Ce/TiO2. The CdS and ZnS coated core shell particles (CdS + ZnS)/Fe2O3 shows the highest rate of hydrogen (H2) production under optimized conditions. Packed bed tubular reactor was used to study the performance of prepared photocatalysts. Selection of the best packing material is a key for maximum removal efficiency. Cheap, lightweight and easily adsorbing vermiculate materials were used as a novel packing material and were found to be effective in splitting H2S. Effect of various operating parameters like flow rate, sulphide concentration, catalyst dosage, light irradiation were tested and optimized for maximum H2 conversion of 92% from industrial waste H2S. Copyright © 2016 Elsevier Ltd. All rights reserved.

  20. Efficient operator splitting algorithm for joint sparsity-regularized SPIRiT-based parallel MR imaging reconstruction.

    Science.gov (United States)

    Duan, Jizhong; Liu, Yu; Jing, Peiguang

    2018-02-01

    Self-consistent parallel imaging (SPIRiT) is an auto-calibrating model for the reconstruction of parallel magnetic resonance imaging, which can be formulated as a regularized SPIRiT problem. The Projection Over Convex Sets (POCS) method was used to solve the formulated regularized SPIRiT problem. However, the quality of the reconstructed image still needs to be improved. Though methods such as NonLinear Conjugate Gradients (NLCG) can achieve higher spatial resolution, these methods always demand very complex computation and converge slowly. In this paper, we propose a new algorithm to solve the formulated Cartesian SPIRiT problem with the JTV and JL1 regularization terms. The proposed algorithm uses the operator splitting (OS) technique to decompose the problem into a gradient problem and a denoising problem with two regularization terms, which is solved by our proposed split Bregman based denoising algorithm, and adopts the Barzilai and Borwein method to update step size. Simulation experiments on two in vivo data sets demonstrate that the proposed algorithm is 1.3 times faster than ADMM for datasets with 8 channels. Especially, our proposal is 2 times faster than ADMM for the dataset with 32 channels. Copyright © 2017 Elsevier Inc. All rights reserved.

  1. Methods for implementing revisions to emergency operating procedures. Final report

    International Nuclear Information System (INIS)

    Myers, L.B.; Bell, A.J.

    1984-05-01

    In response to the Three Mile Island (TMI) accident, the US Nuclear Regulatory Commission (NRC) has published the TMI Action Plan. The TMI Action Plan Item I.C.1 called for the upgrading of Emergency Operating Procedures (EOPs) at nuclear power plants. The program developed from this Action Plan item has resulted in utility efforts to: (1) revise EOPs; (2) train personnel in the use of the EOPs; and (3) implement the revised EOPs. The NRC supported the study presented in this report to identify factors which influence the effectiveness of training and implementation of revised EOPs. The NRC's major concern was the possible effects of negative transfer of training. The report includes a summary of existing methods for implementing revisions to procedures based on interviews of plant personnel, a review of the training literature applicable to the effect of previously learned procedures on the learning of and performance with revised procedures (i.e., negative transfer) and recommendations of methods and schedules for implementing revised EOPs. While the study found that the concern over negative transfer of training was not as great as anticipated, several recommendations were made. These include: (1) overtraining of operators to reduce the effect of observed negative transfer; and (2) implementation of the revised EOPs as soon as possible after training to minimize the time operators must rely upon the old EOPs after having been trained on the revised EOPs. The results of the study should be useful both to the utilities and the NRC in the development and review of EOP implementation programs

  2. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    International Nuclear Information System (INIS)

    JOHNSTON, D.C.

    2000-01-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A

  3. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  4. Lessons learned from operating experience, maintenance procedures and training measures

    International Nuclear Information System (INIS)

    Guttner, K.; Gronau, D.

    2003-01-01

    Training programmes for nuclear facility personnel as a result of the developing phase of SAT have to be approved in the subsequent implementation and evaluation phases with the consequence of several feedback activities in the whole training process. The effectiveness of this procedure has to be evaluated especially with respect to an improvement of safety culture, shorter outage times or better plant performance, resulting in a smaller number of incidents due to human failures. The first two arguments are directly connected with all types of maintenance work in a nuclear power plant and the related preparatory training measures. The reduction of incidents due to human failures is the result of different influences, i.e. training of the operational as well as of the maintenance personnel together with changes of the operating procedures or system design. Though an evaluation of the training process should always be based on a clear definition of criteria by which the fulfilment of the learning objectives can be measured directly, the real effectiveness of training is proven by the behaviour and attitude of the personnel which can only be taken from indirect indicators. This is discussed in more detail for some examples being partly related to the above mentioned arguments. An excellent plant performance, representing a general objective of all activities, can be analysed by the changed number and reasons of incidents in a plant during its operation time. Two further examples are taken from the reactor service field where there is a tendency to reduce the individual dose rates by changed devices and/or procedures as an output from training experience with mockups. Finally the rationalisation of refresher training for operational personnel by the use of interactive teaching programs (Computer Based Training - CBT) is presented which integrate learning objectives together with a test module. (author)

  5. Assessment of different concentrations of ketofol in procedural operations

    International Nuclear Information System (INIS)

    Daabiss, Mohamed; Elsherbiny, Medhat; Al Otaibi, Rashed

    2009-01-01

    Propofol is an intravenous anesthetic that is often used as an adjuvant during monitored anesthesia care, the addition of ketamine to propofol may counteract the cardiorespiratory depression seen with propofol used alone. Ketofol (ketamine/propofol combination) was used for procedural sedation and analgesia. However, evaluation of the effectiveness of different concentrations of Ketofol in procedural operation regarding changes in haemodynamics, emergence phenomena, recovery time, the doses, and adverse effects was not yet studied, so this randomized, double blinded study was designed to compare the quality of analgesia and side effects of intravenous different concentrations of ketofol. One hundred children of both sex undergoing procedural operation, e.g. esophgoscopy, rectoscopy, bone marrow aspiration and liver biopsy participated in this. Patients received an infusion of a solution containing either combination of propofol: ketamine (1:1) (Group I) or propofol: ketamine (4:1) (Group II). Subsequent infusion rates to a predetermined sedation level using Ramsay Sedation Scale. Heart rate, noninvasive arterial blood pressure (NIBP), oxygen saturation (SpO2), end tidal carbon dioxide (Etco 2 ) and incidence of any side effects were recorded. There were no significant hemodynamic changes in both groups after induction. However, there was an increase in postoperative nausea, psychomimetic side effects, and delay in discharge times in group I compared to group II. The adjunctive use of smaller dose of ketamine in ketofol combination minimizes the psychomimetic side effects and shortens the time of hospital discharge. (author)

  6. Environmental Sciences Division Toxicology Laboratory standard operating procedures

    International Nuclear Information System (INIS)

    Kszos, L.A.; Stewart, A.J.; Wicker, L.F.; Logsdon, G.M.

    1989-09-01

    This document was developed to provide the personnel working in the Environmental Sciences Division's Toxicology Laboratory with documented methods for conducting toxicity tests. The document consists of two parts. The first part includes the standard operating procedures (SOPs) that are used by the laboratory in conducting toxicity tests. The second part includes reference procedures from the US Environmental Protection Agency document entitled Short-Term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Waters to Freshwater Organisms, upon which the Toxicology Laboratory's SOPs are based. Five of the SOPs include procedures for preparing Ceriodaphnia survival and reproduction test. These SOPs include procedures for preparing Ceriodaphnia food (SOP-3), maintaining Ceriodaphnia cultures (SOP-4), conducting the toxicity test (SOP-13), analyzing the test data (SOP-13), and conducting a Ceriodaphnia reference test (SOP-15). Five additional SOPs relate specifically to the fathead minnow (Pimephales promelas) larval survival and growth test: methods for preparing fathead minnow larvae food (SOP-5), maintaining fathead minnow cultures (SOP-6), conducting the toxicity test (SOP-9), analyzing the test data (SOP-12), and conducting a fathead minnow reference test (DOP-14). The six remaining SOPs describe methods that are used with either or both tests: preparation of control/dilution water (SOP-1), washing of glassware (SOP-2), collection and handling of samples (SOP-7), preparation of samples (SOP-8), performance of chemical analyses (SOP-11), and data logging and care of technical notebooks (SOP-16)

  7. The European Stroke Organisation Guidelines: a standard operating procedure.

    Science.gov (United States)

    Ntaios, George; Bornstein, Natan M; Caso, Valeria; Christensen, Hanne; De Keyser, Jacques; Diener, Hans-Christoph; Diez-Tejedor, Exuperio; Ferro, Jose M; Ford, Gary A; Grau, Armin; Keller, Emanuella; Leys, Didier; Russell, David; Toni, Danilo; Turc, Guillaume; Van der Worp, Bart; Wahlgren, Nils; Steiner, Thorsten

    2015-10-01

    In 2008, the recently founded European Stroke Organisation published its guidelines for the management of ischemic stroke and transient ischemic attack. This highly cited document was translated in several languages and was updated in 2009. Since then, the European Stroke Organisation has published guidelines for the management of intracranial aneurysms and subarachnoidal hemorrhage, for the establishment of stroke units and stroke centers, and recently for the management of intracerebral hemorrhage. In recent years, the methodology for the development of guidelines has evolved significantly. To keep pace with this progress and driven by the strong determination of the European Stroke Organisation to further promote stroke management, education, and research, the European Stroke Organisation decided to delineate a detailed standard operating procedure for its guidelines. There are two important cornerstones in this standard operating procedure: The first is the implementation of the Grading of Recommendations Assessment, Development, and Evaluation methodology for the development of its Guideline Documents. The second one is the decision of the European Stroke Organisation to move from the classical model of a single Guideline Document about a major topic (e.g. management of ischemic stroke) to focused modules (i.e. subdivisions of a major topic). This will enable the European Stroke Organisation to react faster when new developments in a specific stroke field occur and update its recommendations on the related module rather swiftly; with the previous approach of a single large Guideline Document, its entire revision had to be completed before an updated publication, delaying the production of up-to-date guidelines. After discussion within the European Stroke Organisation Guidelines Committee and significant input from European Stroke Organisation members as well as methodologists and analysts, this document presents the official standard operating procedure for

  8. Step Complexity Measure for Emergency Operating Procedures - Determining Weighting Factors

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea; Kim, Jaewhan; Ha, Jaejoo

    2003-01-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human error has been regarded as the primary cause of many events. Therefore, to ensure system safety, extensive effort has been made to identify the significant factors that can cause human error. According to related studies, written manuals or operating procedures are revealed as one of the important factors, and the understandability is pointed out as one of the major reasons for procedure-related human errors.Many qualitative checklists have been suggested to evaluate emergency operating procedures (EOPs) of NPPs so as to minimize procedure-related human errors. However, since qualitative evaluations using checklists have some drawbacks, a quantitative measure that can quantify the complexity of EOPs is indispensable.From this necessity, Park et al. suggested the step complexity (SC) measure to quantify the complexity of procedural steps included in EOPs. To verify the appropriateness of the SC measure, averaged step performance time data obtained from emergency training records of the loss-of-coolant accident (LOCA) and the excess steam demand event were compared with estimated SC scores. However, although averaged step performance time data and estimated SC scores show meaningful correlation, some important issues such as determining proper weighting factors have to be clarified to ensure the appropriateness of the SC measure. These were not properly dealt with due to a lack of backup data.In this paper, to resolve one of the important issues, emergency training records are additionally collected and analyzed in order to determine proper weighting factors. The total number of collected records is 66, and the training scenarios cover five emergency conditions including the LOCA, the steam generator tube rupture, the loss of all feedwater, the loss of off-site power, and the station blackout. From these records, average step performance time data are retrieved, and new

  9. In vitro study on the disinfectability of two split-septum needle-free connection devices using different disinfection procedures

    Directory of Open Access Journals (Sweden)

    Engelhart, Steffen

    2015-12-01

    Full Text Available This in vitro study investigated the external disinfection of two needle-free connection devices (NFC using Octeniderm (spraying and wiping technique vs. Descoderm pads (wiping technique. The split-septum membrane of the NFC was contaminated with >10 CFU . The efficacy of the disinfection at 30 sec. exposure time was controlled by taking a swab sample and by flushing the NFC with sterile 0.9% sodium chloride solution. Disinfection with octenidine dihydrochloride 0.1 g, 1-Propanol 30.0 g, and 2-Propanol 45.0 g in solution was highly effective (CFU reduction ≥4 log against both microorganisms, whereas the use of 63.1 g 2-Propanol in 100 ml solution led to residual contamination with . Our investigation underlines that (i in clinical practice disinfection of NFCs before use is mandatory, and that (ii details of disinfection technique are of utmost importance regarding their efficacy. Our investigation revealed no significant differences between both split-septum NFC types. Clinical studies are needed to confirm a possible superiority of disinfectants with long-lasting residual antimicrobial activity.

  10. The step complexity measure for emergency operating procedures: measure verification

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea; Ha, Jaejoo; Park, Changkue

    2002-01-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human errors play a major role in many accidents. Therefore, to prevent an occurrence of accidents or to ensure system safety, extensive effort has been made to identify significant factors that can cause human errors. According to related studies, written manuals or operating procedures are revealed as one of the most important factors, and the understandability is pointed out as one of the major reasons for procedure-related human errors. Many qualitative checklists are suggested to evaluate emergency operating procedures (EOPs) of NPPs. However, since qualitative evaluations using checklists have some drawbacks, a quantitative measure that can quantify the complexity of EOPs is very necessary to compensate for them. In order to quantify the complexity of steps included in EOPs, Park et al. suggested the step complexity (SC) measure. In addition, to ascertain the appropriateness of the SC measure, averaged step performance time data obtained from emergency training records for the loss of coolant accident and the excess steam dump event were compared with estimated SC scores. Although averaged step performance time data show good correlation with estimated SC scores, conclusions for some important issues that have to be clarified to ensure the appropriateness of the SC measure were not properly drawn because of lack of backup data. In this paper, to clarify remaining issues, additional activities to verify the appropriateness of the SC measure are performed using averaged step performance time data obtained from emergency training records. The total number of available records is 36, and training scenarios are the steam generator tube rupture and the loss of all feedwater. The number of scenarios is 18 each. From these emergency training records, averaged step performance time data for 30 steps are retrieved. As the results, the SC measure shows statistically meaningful

  11. Operability test procedure for PFP wastewater sampling facility

    International Nuclear Information System (INIS)

    Hirzel, D.R.

    1995-01-01

    Document provides instructions for performing the Operability Test of the 225-WC Wastewater Sampling Station which monitors the discharge to the Treated Effluent Disposal Facility from the Plutonium Finishing Plant. This Operability Test Procedure (OTP) has been prepared to verify correct configuration and performance of the PFP Wastewater sampling system installed in Building 225-WC located outside the perimeter fence southeast of the Plutonium Finishing Plant (PFP). The objective of this test is to ensure the equipment in the sampling facility operates in a safe and reliable manner. The sampler consists of two Manning Model S-5000 units which are rate controlled by the Milltronics Ultrasonic flowmeter at manhole No.C4 and from a pH measuring system with the sensor in the stream adjacent to the sample point. The intent of the dual sampling system is to utilize one unit to sample continuously at a rate proportional to the wastewater flow rate so that the aggregate tests are related to the overall flow and thereby eliminate isolated analyses. The second unit will only operate during a high or low pH excursion of the stream (hence the need for a pH control). The major items in this OTP include testing of the Manning Sampler System and associated equipment including the pH measuring and control system, the conductivity monitor, and the flow meter

  12. Operational procedure standard for occurrences involving radioactive materials

    International Nuclear Information System (INIS)

    Piekarz, Leonardo; Rezende, Talita C.; Pinheiro, Christiano J.G.

    2017-01-01

    This study has as objective to analyze more deeply the actions of response to emergencies involving radioactive materials, in the intent to establish a pattern to the actions performed by the military fire fighters of the Military Fire Brigade of Minas Gerais. To met these goals, it has been attempted to analyze the procedures utilized and recommended, nowadays, for the military fire fighters of CBMMG, and through directed studies, to suggest new actions possible to be executed in the local of the emergency in a way that will not expose the garrison to doses of ionizing radiation that may prejudice them. It is a study of bibliographic, exploratory, and also descriptive nature, realized through a qualitative approach. The techniques used for the research were the analysis of institutional documents, norms and other literature produced by renamed entities in the radiologic and biosafety areas. It was then concluded that CBMMG, through simple actions of response, can provide higher quality and safety in the operations involving radiologic accidents, standing out that the implemented actions nowadays are very beneath the capacity of the corporation, due to the lack of knowledge of the matter by the fire fighters. It was proposed, then, that new actions be implemented and instituted as operational procedures to be used on those emergencies, with the objective of provide a higher safety and professionalism in the attendance to emergencies involving radioactive materials. (author)

  13. Operational procedure standard for occurrences involving radioactive materials

    Energy Technology Data Exchange (ETDEWEB)

    Piekarz, Leonardo, E-mail: leonardopbm@yahoo.com.br [Academia de Bombeiros Militar de Minas Gerais, Belo Horizonte, MG (Brazil); Rezende, Talita C.; Pinheiro, Christiano J.G., E-mail: talitacolombi@yahoo.com, E-mail: christrieste@yahoo.it [Universidade Federal do Espirito Santo (CCA/UFES), Alegre, ES (Brazil). Programa de Pós-Graduação em Engenharia Química

    2017-07-01

    This study has as objective to analyze more deeply the actions of response to emergencies involving radioactive materials, in the intent to establish a pattern to the actions performed by the military fire fighters of the Military Fire Brigade of Minas Gerais. To met these goals, it has been attempted to analyze the procedures utilized and recommended, nowadays, for the military fire fighters of CBMMG, and through directed studies, to suggest new actions possible to be executed in the local of the emergency in a way that will not expose the garrison to doses of ionizing radiation that may prejudice them. It is a study of bibliographic, exploratory, and also descriptive nature, realized through a qualitative approach. The techniques used for the research were the analysis of institutional documents, norms and other literature produced by renamed entities in the radiologic and biosafety areas. It was then concluded that CBMMG, through simple actions of response, can provide higher quality and safety in the operations involving radiologic accidents, standing out that the implemented actions nowadays are very beneath the capacity of the corporation, due to the lack of knowledge of the matter by the fire fighters. It was proposed, then, that new actions be implemented and instituted as operational procedures to be used on those emergencies, with the objective of provide a higher safety and professionalism in the attendance to emergencies involving radioactive materials. (author)

  14. D0 Central Tracking Solenoid Energization, Controls, Interlocks and Quench Protection Operating Procedures

    International Nuclear Information System (INIS)

    Hance, R.

    1998-01-01

    This procedure is used when it is necessary to operate the solenoid energization, controls, interlocks and quench detection system. Note that a separate procedure exists for operating the solenoid 'cryogenic' systems. Only D0 Control Room Operators or the Project Electrical Engineer are qualified to execute these procedures or operate the solenoid system. This procedure assumes that the operator is familiar with using the Distributed Manufacturing Automation and Control Software (DMACS).

  15. Standard Operating Procedures for Female Genital Sexual Pain

    DEFF Research Database (Denmark)

    Fugl-Meyer, Kerstin S; Bohm-Starke, Nina; Damsted Petersen, Christina

    2012-01-01

    Introduction.  Female genital sexual pain (GSP) is a common, distressing complaint in women of all ages that is underrecognized and undertreated. Definitions and terminology for female GSP are currently being debated. While some authors have suggested that GSP is not per se a sexual dysfunction......, but rather a localized genial pain syndrome, others adhere to using clearly sexually related terms such as dyspareunia and vaginismus. Aim.  The aims of this brief review are to present definitions of the different types of female GSP. Their etiology, incidence, prevalence, and comorbidity with somatic......-Meyer KS, Bohm-Starke N, Damsted Petersen C, Fugl-Meyer A, Parish S, and Giraldi A. Standard operating procedures for female genital sexual pain. J Sex Med **;**:**-**....

  16. Quality assurance: Importance of systems and standard operating procedures.

    Science.gov (United States)

    Manghani, Kishu

    2011-01-01

    It is mandatory for sponsors of clinical trials and contract research organizations alike to establish, manage and monitor their quality control and quality assurance systems and their integral standard operating procedures and other quality documents to provide high-quality products and services to fully satisfy customer needs and expectations. Quality control and quality assurance systems together constitute the key quality systems. Quality control and quality assurance are parts of quality management. Quality control is focused on fulfilling quality requirements, whereas quality assurance is focused on providing confidence that quality requirements are fulfilled. The quality systems must be commensurate with the Company business objectives and business model. Top management commitment and its active involvement are critical in order to ensure at all times the adequacy, suitability, effectiveness and efficiency of the quality systems. Effective and efficient quality systems can promote timely registration of drugs by eliminating waste and the need for rework with overall financial and social benefits to the Company.

  17. Randomized, Split-Face/Décolleté Comparative Trial of Procedure Enhancement System for Fractional non-Ablative Laser Resurfacing Treatment.

    Science.gov (United States)

    Robinson, Deanne Mraz; Frulla, Ashton P

    2017-07-01

    INTRODUCTION: A topical proprietary procedural enhancement system (PES) containing a combination of active ingredients including a tripeptide and hexapeptide (TriHex Technology™, Alastin Procedure Enhancement Invasive System, ALASTIN Skincare™, Inc., Carlsbad, CA) has been used successfully to aid in healing and improve symptomatology following resurfacing procedures. METHODS: PES (Gentle Cleanser, Regenerating Skin Nectar with TriHex Technology™, Ultra Nourishing Moisturizer with TriHex Technology™, Soothe + Protect Recovery Balm, Broad Spectrum 30+ Sunscreen) was compared to a basic regimen (Aquaphor™, Cerave™ cleanser, Vanicream™, Alastin Broad Spectrum 30+ Sunscreen) in a split face/ décolleté trial following fractional non-ablative thulium-doped resurfacing treatment to the face or décolleté. The skin was pre-conditioned and treated during and after the procedure using the two regimens. RESULTS: A blinded investigator rated the PES statistically superior to the basic regimen on healing post-laser treatment on day 4 based on lentigines, texture, and Global Skin Quality. Subjects also reported 'better looking and feeling' skin on the PES side. CONCLUSION: PES appears to improve healing post-non ablative thulium-doped resurfacing treatment to the face/décolleté in comparison with standard of care. J Drugs Dermatol. 2017;16(7):707-710..

  18. An $h$-Adaptive Operator Splitting Method for Two-Phase Flow in 3D Heterogeneous Porous Media

    KAUST Repository

    Chueh, Chih-Che; Djilali, Ned; Bangerth, Wolfgang

    2013-01-01

    The simulation of multiphase flow in porous media is a ubiquitous problem in a wide variety of fields, such as fuel cell modeling, oil reservoir simulation, magma dynamics, and tumor modeling. However, it is computationally expensive. This paper presents an interconnected set of algorithms which we show can accelerate computations by more than two orders of magnitude compared to traditional techniques, yet retains the high accuracy necessary for practical applications. Specifically, we base our approach on a new adaptive operator splitting technique driven by an a posteriori criterion to separate the flow from the transport equations, adaptive meshing to reduce the size of the discretized problem, efficient block preconditioned solver techniques for fast solution of the discrete equations, and a recently developed artificial diffusion strategy to stabilize the numerical solution of the transport equation. We demonstrate the accuracy and efficiency of our approach using numerical experiments in one, two, and three dimensions using a program that is made available as part of a large open source library. © 2013 Society for Industrial and Applied Mathematics.

  19. Operability test procedure for 211BA flow proportional sampler

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    The purpose of this operability test procedure (OTP) is to verify the 211-BA flow proportional sampler system and components function correctly as intended by design. System test will include the sampling system, all associated instrumentation, and Facility Process Monitor and Control System (FPMCS). The combined chemical sewer stream from B Plant flows through sump 211BA-SMP-01 located in 211-BA and is continuously monitored for gamma and beta radiation and pH. 211-BA has been upgraded to include a flow proportional sampler. A specified sample volume will be withdrawn at programmed intervals from the 211BA sump and deposited in a 19 liter plastic carboy. The sampler will be programmed per the vendor installation and operations manual by B Plant instrument maintenance personnel. Samples will be taken during five consecutive sample cycles with the sample volumes and sample frequencies recorded for comparison purposes. Additional tests related to the sampler include the alarm circuitry for loss of power and failure to obtain sample

  20. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  1. Improved Design of Crew Operation in Computerized Procedure System of APR1400

    Energy Technology Data Exchange (ETDEWEB)

    Seong, No Kyu; Jung, Yeon Sub; Sung, Chan Ho [KHNP, Daejeon (Korea, Republic of)

    2016-05-15

    The operators perform the paper-based procedures in analog-based conventional main control room (MCR) depending on only communications between operators except a procedure controller such as a Shift Supervisor (SS), however in digital-based MCR the operators can confirm the procedures simultaneously in own console when the procedure controller of computerized procedure (CP) opens the CP. The synchronization and a synchronization function between procedure controller and other operators has to be considered to support the function of crew operation. This paper suggests the improved design of crew operation in computerized procedure system of APR1400. This paper suggests the improved design of APR1400 CPS. These improvements can help operators perform the crew procedures more efficiently. And they reduce a burden of communication and misunderstanding of computerized procedures. These improvements can be applied to CPS after human factors engineering verification and validation.

  2. Operational limits and conditions and operating procedures for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing safety standards relating to nuclear power plants. The present Safety Guide supersedes the IAEA Safety Guide on Operational Limits and Conditions for Nuclear Power Plants which was issued in 1979 as Safety Series No. 50-SG-O3. For a nuclear power plant to be operated in a safe manner, the provisions made in the final design and subsequent modifications shall be reflected in limitations on plant operating parameters and in the requirements on plant equipment and personnel. Under the responsibility of the operating organization, these shall be developed during the design safety evaluation as a set of operational limits and conditions (OLCs). A major contribution to compliance with the OLCs is made by the development and utilization of operating procedures (OPs) that are consistent with and fully implement the OLCs. The requirements for the OLCs and OPs are established in Section 5 of the IAEA Safety Requirements publication Safety of Nuclear Power Plants: Operation, which this Safety Guide supplements. The purpose of this Safety Guide is to provide guidance on the development, content and implementation of OLCs and OPs. The Safety Guide is directed at both regulators and owners/operators. This Safety Guide covers the concept of OLCs, their content as applicable to land based stationary power plants with thermal neutron reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The OPs to support the implementation of the OLCs and to ensure their observance are also within the scope of this Safety Guide. The particular aspects of the procedures for maintenance, surveillance, in-service inspection and other safety related activities in connection with the safe operation of nuclear power plants are outside the scope of this Safety Guide but can be found in other IAEA Safety Guides. Section 2 indicates the

  3. Operational limits and conditions and operating procedures for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2000-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing safety standards relating to nuclear power plants. The present Safety Guide supersedes the IAEA Safety Guide on Operational Limits and Conditions for Nuclear Power Plants which was issued in 1979 as Safety Series No. 50-SG-O3. For a nuclear power plant to be operated in a safe manner, the provisions made in the final design and subsequent modifications shall be reflected in limitations on plant operating parameters and in the requirements on plant equipment and personnel. Under the responsibility of the operating organization, these shall be developed during the design safety evaluation as a set of operational limits and conditions (OLCs). A major contribution to compliance with the OLCs is made by the development and utilization of operating procedures (OPs) that are consistent with and fully implement the OLCs. The requirements for the OLCs and OPs are established in Section 5 of the IAEA Safety Requirements publication Safety of Nuclear Power Plants: Operation, which this Safety Guide supplements. The purpose of this Safety Guide is to provide guidance on the development, content and implementation of OLCs and OPs. The Safety Guide is directed at both regulators and owners/operators. This Safety Guide covers the concept of OLCs, their content as applicable to land based stationary power plants with thermal neutron reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The OPs to support the implementation of the OLCs and to ensure their observance are also within the scope of this Safety Guide. The particular aspects of the procedures for maintenance, surveillance, in-service inspection and other safety related activities in connection with the safe operation of nuclear power plants are outside the scope of this Safety Guide but can be found in other IAEA Safety Guides. Section 2 indicates the

  4. Standard operating procedures for ESPEN guidelines and consensus papers.

    Science.gov (United States)

    Bischoff, Stephan C; Singer, Pierre; Koller, Michael; Barazzoni, Rocco; Cederholm, Tommy; van Gossum, André

    2015-12-01

    The ESPEN Guideline standard operating procedures (SOP) is based on the methodology provided by the Association of Scientific Medical Societies of Germany (AWMF), the Scottish Intercollegiate Guidelines Network (SIGN), and the Centre for Evidence-based Medicine at the University of Oxford. The SOP is valid and obligatory for all future ESPEN-sponsored guideline projects aiming to generate high-quality guidelines on a regular basis. The SOP aims to facilitate the preparation of guideline projects, to streamline the consensus process, to ensure quality and transparency, and to facilitate the dissemination and publication of ESPEN guidelines. To achieve this goal, the ESPEN Guidelines Editorial board (GEB) has been established headed by two chairmen. The GEB will support and supervise the guideline processes and is responsible for the strategic planning of ESPEN guideline activities. Key elements of the SOP are the generation of well-built clinical questions according to the PICO system, a systemic literature search, a classification of the selected literature according to the SIGN evidence levels providing an evidence table, and a clear and straight-forward consensus procedure consisting of online voting's and a consensus conference. Only experts who meet the obligation to disclosure any potential conflict of interests and who are not employed by the Industry can participate in the guideline process. All recommendations will be graded according to the SIGN grading and novel outcome models besides biomedical endpoints. This approach will further extent the leadership of ESPEN in creating up-to-date and suitable for implementation guidelines and in sharing knowledge on malnutrition and clinical nutrition. Copyright © 2015 Elsevier Ltd and European Society for Clinical Nutrition and Metabolism. All rights reserved.

  5. Black tungsten nitride as a metallic photocatalyst for overall water splitting operable at up to 765 nm

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Yu Lei; Li, Yu Hang; Wang, Xue Lu; Chen, Ai Ping; Yang, Hua Gui [Key Laboratory for Ultrafine Materials of Ministry of Education, School of Materials Science and Engineering, East China University of Science and Technology, Shanghai (China); Nie, Ting; Gong, Xue Qing [Key Laboratory for Advanced Materials, Centre for Computational Chemistry and Research Institute of Industrial Catalysis, East China University of Science and Technology, Shanghai (China); Zheng, Li Rong [Beijing Synchrotron Radiation Facility, Institute of High Energy Physics, Chinese Academy of Sciences (China)

    2017-06-19

    Semiconductor photocatalysts are hardly employed for overall water splitting beyond 700 nm, which is due to both thermodynamic aspects and activation barriers. Metallic materials as photocatalysts are known to overcome this limitation through interband transitions for creating electron-hole pairs; however, the application of metallic photocatalysts for overall water splitting has never been fulfilled. Black tungsten nitride is now employed as a metallic photocatalyst for overall water splitting at wavelengths of up to 765 nm. Experimental and theoretical results together confirm that metallic properties play a substantial role in exhibiting photocatalytic activity under red-light irradiation for tungsten nitride. This work represents the first red-light responsive photocatalyst for overall water splitting, and may open a promising venue in searching of metallic materials as efficient photocatalysts for solar energy utilization. (copyright 2017 Wiley-VCH Verlag GmbH and Co. KGaA, Weinheim)

  6. A Multiscale Enrichment Procedure for Nonlinear Monotone Operators

    KAUST Repository

    Efendiev, Yalchin R.

    2014-03-11

    In this paper, multiscale finite element methods (MsFEMs) and domain decomposition techniques are developed for a class of nonlinear elliptic problems with high-contrast coefficients. In the process, existing work on linear problems [Y. Efendiev, J. Galvis, R. Lazarov, S. Margenov and J. Ren, Robust two-level domain decomposition preconditioners for high-contrast anisotropic flows in multiscale media. Submitted.; Y. Efendiev, J. Galvis and X. Wu, J. Comput. Phys. 230 (2011) 937–955; J. Galvis and Y. Efendiev, SIAM Multiscale Model. Simul. 8 (2010) 1461–1483.] is extended to treat a class of nonlinear elliptic operators. The proposed method requires the solutions of (small dimension and local) nonlinear eigenvalue problems in order to systematically enrich the coarse solution space. Convergence of the method is shown to relate to the dimension of the coarse space (due to the enrichment procedure) as well as the coarse mesh size. In addition, it is shown that the coarse mesh spaces can be effectively used in two-level domain decomposition preconditioners. A number of numerical results are presented to complement the analysis.

  7. A comparison of procedures for unpairing conditioned reflexive motivating operations.

    Science.gov (United States)

    Kettering, Tracy L; Neef, Nancy A; Kelley, Michael E; Heward, William L

    2018-03-01

    This study compared the effectiveness of two procedures to reduce behavior evoked by a reflexive conditioned motivating operation (CMO-R). Task demands were shown to evoke escape-maintained problem behavior for 4 students with disabilities. Alternative communication responses were taught as an appropriate method to request escape and this treatment combined with extinction for problem behavior led to decreases in problem behavior for all students. A beeping timer was then arranged to temporally precede the task demand to create a CMO-R that evoked communication responses. When data showed that the sound of the timer was functioning as a CMO-R, two methods to reduce behavior evoked by a CMO-R-extinction unpairing and noncontingent unpairing-were evaluated. Results indicated that noncontingent unpairing was an effective method to reduce the evocative effects of the CMO-R. Extinction produced unsystematic effects across participants. Results are discussed in terms of abolishing CMOs and the implications of CMOs. © 2018 Society for the Experimental Analysis of Behavior.

  8. Quality assurance: Importance of systems and standard operating procedures

    Directory of Open Access Journals (Sweden)

    Kishu Manghani

    2011-01-01

    Full Text Available It is mandatory for sponsors of clinical trials and contract research organizations alike to establish, manage and monitor their quality control and quality assurance systems and their integral standard operating procedures and other quality documents to provide high-quality products and services to fully satisfy customer needs and expectations. Quality control and quality assurance systems together constitute the key quality systems. Quality control and quality assurance are parts of quality management. Quality control is focused on fulfilling quality requirements, whereas quality assurance is focused on providing confidence that quality requirements are fulfilled. The quality systems must be commensurate with the Company business objectives and business model. Top management commitment and its active involvement are critical in order to ensure at all times the adequacy, suitability, effectiveness and efficiency of the quality systems. Effective and efficient quality systems can promote timely registration of drugs by eliminating waste and the need for rework with overall financial and social benefits to the Company.

  9. The insertion device magnetic measurement facility: Prototype and operational procedures

    International Nuclear Information System (INIS)

    Burkel, L.; Dejus, R.; Maines, J.; O'Brien, J.; Vasserman, I.; Pfleuger, J.

    1993-03-01

    This report is a description of the current status of the magnetic measurement facility and is a basic instructional manual for the operation of the facility and its components. Please refer to the appendices for more detailed information about specific components and procedures. The purpose of the magnetic measurement facility is to take accurate measurements of the magnetic field in the gay of the IDs in order to determine the effect of the ID on the stored particle beam and the emitted radiation. The facility will also play an important role when evaluating new ideas, novel devices, and inhouse prototypes as part of the ongoing research and development program at the APS. The measurements will be performed with both moving search coils and moving Hall probes. The IDs will be evaluated by computer modeling of the emitted radiation for any given (measured) magnetic field map. The quality of the magnetic field will be described in terms of integrated multipoles for the effect on Storage Ring performance and in terms of the derived trajectories for the emitted radiation. Before being installed on the Storage Ring, every device will be measured and characterized to assure that it is compatible with Storage Ring requirements and radiation specifications. The accuracy that the APS needs to achieve for magnetic measurements will be based on these specifications

  10. Manual of Standard Operating Procedures for Veterinary Drug Residue Analysis

    International Nuclear Information System (INIS)

    2016-01-01

    Laboratories are crucial to national veterinary drug residue monitoring programmes. However, one of the main challenges laboratories encounter is obtaining access to relevant methods of analysis. Thus, in addition to training, providing technical advice and transferring technology, the Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture has resolved to develop clear and practical manuals to support Member State laboratories. The Coordinated Research Project (CRP) on Development of Radiometric and Allied Analytical Methods to Strengthen Residue Control Programs for Antibiotic and Anthelmintic Veterinary Drug Residues has developed a number of analytical methods as standard operating procedures (SOPs), which are now compiled here. This publication contains SOPs on chromatographic and spectrometric techniques, as well as radioimmunoassay and associated screening techniques, for various anthelmintic and antimicrobial veterinary drug residue analysis. Some analytical method validation protocols are also included. The publication is primarily aimed at food and environmental safety laboratories involved in testing veterinary drug residues, including under organized national residue monitoring programmes. It is expected to enhance laboratory capacity building and competence through the use of radiometric and complementary tools and techniques. The publication is also relevant for applied research on residues of veterinary drugs in food and environmental samples

  11. NEPTUNIX 2: Operating on computers network - Catalogued procedures

    International Nuclear Information System (INIS)

    Roux, Pierre.

    1982-06-01

    NEPTUNIX 2 is a package which carries out the simulation of complex processes described by numerous non linear algebro-differential equations. Main features are: non linear or time dependent parameters, implicit form, stiff systems, dynamic change of equations leading to discontinuities on some variables. Thus the mathematical model is built with an equations set F(x,x',1,t), where t is the independent variable, x' the derivative of x and 1 an ''algebrized'' logical variable. The NEPTUNIX 2 package is divided into two successive major steps: a non numerical step and a numerical step. The numerical step, using results from a picture of the model translated in FORTRAN language, in a form fitted for the executive computer, carries out the simulmations; in this way, NEPTUNIX 2 numerical step is portable. On the opposite, the non numerical step must be executed on a series 370 IBM computer or on a compatible computer. The present manual describes NEPTUNIX 2 operating procedures when the two steps are executed on the same computer and also when the numerical step is executed on an other computer connected or not on the same computing network [fr

  12. New Procedure for Account Operations at the CERN Service Desk

    CERN Multimedia

    The Computer Security Team

    2011-01-01

    Who can activate your computing account? Who can unblock it? And who can reset your password if you've forgotten it? Until recently, users who addressed such problems to the Service Desk were asked a set of questions...   The corresponding answers were designed to properly verify the requestor’s identity such that only the real owner could activate/unblock/reset his computing account. However, it turned out that the answers were easily obtainable (and that there is no better set of questions to ask). Therefore, in order to ensure optimal protection of your account, this procedure will be replaced on 28 November 2011. From that date on, users will be asked to produce a physical ID when requesting the Service Desk to perform operations like computer account activation, account unblocking or password resets. This physical ID can either be a passport/ID card or the CERN access card. If you need to activate/unblock/reset your computing account, you will either have to produ...

  13. Modeling of Multi Phase Flow in Porous Media: Operator Splitting, Front Tracking, Interfacial Area and Network Models

    Energy Technology Data Exchange (ETDEWEB)

    Nordhaug, Hans Fredrik

    2001-07-01

    In reservoir problems we consider some or all of the following phases: Oil, gas, water and solid. The solid phase is normally assumed to be immobile and non-deforming, but in general this does not need to be the case. By multi phase flow we will mean the flow of oil, gas and water. The phases are categorized according to their different physical quantities. A hydrocarbon phase, may consist of different hydrocarbon components, e.g., the oil phase can contain several oil and gas types. In this work the components are neglected and only the phases are considered. A porous medium is any solid phase, e.g. sand stone, that is permeable. The flow in a porous medium takes place through connected pores in the rock. Regions on a larger scale that contain oil or gas are called reservoirs. The typical size of a reservoir is kilometers in each direction while the pore scale size is millimeters or less. Solving the Navier-Stokes equation at the pore scale to obtain the transport on a larger scale is not numerically feasible because of the huge difference in scales. Therefore, some averaging is necessary to go from the pore scale (micro scale) to the reservoir scale (macro scale). In this process the Navier-Stokes equations are replaced by macro scale equations that are solved for macro scale variables. The papers presented herein cover several topics in multi phase flow in porous media, and they address some central problems both on the micro scale as well as on the macro scale. In addition, operator splitting techniques have been developed for convection dominated non-linear transport equations.

  14. The operators' non-compliance behavior to conduct emergency operating procedures--comparing with the work experience and the complexity of procedural steps

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea

    2003-01-01

    Many kinds of procedures have been used to reduce the operators' workload throughout various industries, such as in the aviation, the chemical and the nuclear industry. It is remarkable that, however, significant portion of accidents or incidents was caused by procedure related human error due to non-compliance of procedures. In this study, to investigate the operators' non-compliance behavior, emergency-training records were collected using a full scope simulator. And three types of the operators' behavior (such as strict adherence, skipping redundant actions and modifying action sequences) observed from collected emergency training records were compared with both their work experience and the complexity of procedural steps. As the results, three remarkable relationships are obtained. They are: (1) the operators who have an intermediate work experience seem to frequently adopt non-compliance behavior to conduct the procedural steps, (2) the operators seem to frequently adopt non-compliance behavior to conduct the procedural steps that have an intermediate procedural complexity, and (3) the senior reactor operators seem to accommodate their non-compliance behavior based on the complexity of procedural steps. Therefore, it is expected that these relationships can be used as meaningful clues not only to scrutinize the reason for non-compliance behavior but also to suggest appropriate remedies for the reduction of non-compliance behavior that can result in procedure related human error

  15. State Token Petri Net modeling method for formal verification of computerized procedure including operator's interruptions of procedure execution flow

    International Nuclear Information System (INIS)

    Kim, Yun Goo; Seong, Poong Hyun

    2012-01-01

    The Computerized Procedure System (CPS) is one of the primary operating support systems in the digital Main Control Room. The CPS displays procedure on the computer screen in the form of a flow chart, and displays plant operating information along with procedure instructions. It also supports operator decision making by providing a system decision. A procedure flow should be correct and reliable, as an error would lead to operator misjudgement and inadequate control. In this paper we present a modeling for the CPS that enables formal verification based on Petri nets. The proposed State Token Petri Nets (STPN) also support modeling of a procedure flow that has various interruptions by the operator, according to the plant condition. STPN modeling is compared with Coloured Petri net when they are applied to Emergency Operating Computerized Procedure. A converting program for Computerized Procedure (CP) to STPN has been also developed. The formal verification and validation methods of CP with STPN increase the safety of a nuclear power plant and provide digital quality assurance means that are needed when the role and function of the CPS is increasing.

  16. Philosophy, policies, and procedures - The three P's of flight-deck operations

    Science.gov (United States)

    Degani, Asaf; Wiener, Earl L.

    1991-01-01

    Standard operating procedures are drafted and provided to flightcrews to dictate the manner in which tasks are carried out. Failure to conform to Standard Operating Procedures (SOP) is frequently listed as the cause of violations, incidents, and accidents. However, procedures are often designed piecemeal, rather than being based on a sound philosophy of operations and policies that follow from such a philosophy. A framework of philosophy, policies, and procedures is proposed.

  17. UNC Nuclear Industries' human-factored approach to the operating or maintenance procedure

    International Nuclear Information System (INIS)

    Nelson, A.A.; Clark, J.E.

    1982-01-01

    The development of Human Factors Engineering (HFE) and UNC Nuclear Industries' (UNC) commitment to minimizing the potential for human error in the performance of operating or maintenance procedures have lead to a procedure upgrade program. Human-factored procedures were developed using information from many sources including, but not limited to, operators, a human factors specialist, engineers and supervisors. This has resulted in the Job Performance Aid (JPA). This paper presents UNC's approach to providing human-factored operating and maintenance procedures

  18. Standard operating procedures in the disorders of orgasm and ejaculation.

    Science.gov (United States)

    McMahon, Chris G; Jannini, Emmanuele; Waldinger, Marcel; Rowland, David

    2013-01-01

    Ejaculatory/orgasmic disorders are common male sexual dysfunctions and include premature ejaculation (PE), inhibited ejaculation, anejaculation, retrograde ejaculation, and anorgasmia. To provide recommendations and guidelines of the current state-of-the-art knowledge for management of ejaculation/orgasmic disorders in men as standard operating procedures (SOPs) for the treating health care professional. The International Society of Sexual Medicine Standards Committee assembled over 30 multidisciplinary experts to establish SOPs for various male and female sexual medicine topics. The SOP for the management of disorders of orgasm and ejaculation represents the opinion of four experts from four countries developed in a process over a 2-year period. Expert opinion was based on grading of evidence-based medical literature, limited expert opinion, widespread internal committee discussion, public presentation, and debate. PE management is largely dependent upon etiology. Lifelong PE is best managed with PE pharmacotherapy (selective serotonin reuptake inhibitors and/or topical anesthetics). The management of acquired PE is etiology specific and may include erectile dysfunction (ED) pharmacotherapy in men with comorbid ED. All men seeking treatment for PE should receive basic psychosexual education. Graded behavioral therapy is indicated when psychogenic or relationship factors are present and is often best combined with PE pharmacotherapy in an integrated treatment program. Delayed ejaculation, anejaculation, and/or anorgasmia may have a biogenic and/or psychogenic etiology. Men with age-related penile hypoanesthesia should be educated, reassured, and instructed in revised sexual techniques which maximize arousal. Retrograde ejaculation is managed by education, patient reassurance, and pharmacotherapy. Additional research is required to further the understanding of the disorders of ejaculation and orgasm. © 2012 International Society for Sexual Medicine.

  19. FFTF fuel pin design procedure verification for transient operation

    International Nuclear Information System (INIS)

    Baars, R.E.

    1975-05-01

    The FFTF design procedures for evaluating fuel pin transient performance are briefly reviewed, and data where available are compared with design procedure predictions. Specifically, burst conditions derived from Fuel Cladding Transient Tester (FCTT) tests and from ANL loss-of-flow tests are compared with burst pressures computed using the design procedure upon which the cladding integrity limit was based. Failure times are predicted using the design procedure for evaluation of rapid reactivity insertion accidents, for five unterminated TREAT experiments in which well characterized fuel failures were deliberately incurred. (U.S.)

  20. A symptom based decision tree approach to boiling water reactor emergency operating procedures

    International Nuclear Information System (INIS)

    Knobel, R.C.

    1984-01-01

    This paper describes a Decision Tree approach to development of BWR Emergency Operating Procedures for use by operators during emergencies. This approach utilizes the symptom based Emergency Procedure Guidelines approved for implementation by the USNRC. Included in the paper is a discussion of the relative merits of the event based Emergency Operating Procedures currently in use at USBWR plants. The body of the paper is devoted to a discussion of the Decision Tree Approach to Emergency Operating Procedures soon to be implemented at two United States Boiling Water Reactor plants, why this approach solves many of the problems with procedures indentified in the post accident reviews of Three Mile Island procedures, and why only now is this approach both desirable and feasible. The paper discusses how nuclear plant simulators were involved in the development of the Emergency Operating Procedure decision trees, and in the verification and validation of these procedures. (orig./HP)

  1. 21 CFR 606.100 - Standard operating procedures.

    Science.gov (United States)

    2010-04-01

    ... units. (9) Procedures for investigating adverse donor and recipient reactions. (10) Storage temperatures... accurately relating the product(s) to the donor. (5) Blood collection procedure, including in-process precautions taken to measure accurately the quantity of blood removed from the donor. (6) Methods of component...

  2. The procedure execution manager and its application to Advanced Photon Source operation

    International Nuclear Information System (INIS)

    Borland, M.

    1997-01-01

    The Procedure Execution Manager (PEM) combines a complete scripting environment for coding accelerator operation procedures with a manager application for executing and monitoring the procedures. PEM is based on Tcl/Tk, a supporting widget library, and the dp-tcl extension for distributed processing. The scripting environment provides support for distributed, parallel execution of procedures along with join and abort operations. Nesting of procedures is supported, permitting the same code to run as a top-level procedure under operator control or as a subroutine under control of another procedure. The manager application allows an operator to execute one or more procedures in automatic, semi-automatic, or manual modes. It also provides a standard way for operators to interact with procedures. A number of successful applications of PEM to accelerator operations have been made to date. These include start-up, shutdown, and other control of the positron accumulator ring (PAR), low-energy transport (LET) lines, and the booster rf systems. The PAR/LET procedures make nested use of PEM's ability to run parallel procedures. There are also a number of procedures to guide and assist tune-up operations, to make accelerator physics measurements, and to diagnose equipment. Because of the success of the existing procedures, expanded use of PEM is planned

  3. COMPARISON OF IMPLICIT SCHEMES TO SOLVE EQUATIONS OF RADIATION HYDRODYNAMICS WITH A FLUX-LIMITED DIFFUSION APPROXIMATION: NEWTON–RAPHSON, OPERATOR SPLITTING, AND LINEARIZATION

    Energy Technology Data Exchange (ETDEWEB)

    Tetsu, Hiroyuki; Nakamoto, Taishi, E-mail: h.tetsu@geo.titech.ac.jp [Earth and Planetary Sciences, Tokyo Institute of Technology, Tokyo 152-8551 (Japan)

    2016-03-15

    Radiation is an important process of energy transport, a force, and a basis for synthetic observations, so radiation hydrodynamics (RHD) calculations have occupied an important place in astrophysics. However, although the progress in computational technology is remarkable, their high numerical cost is still a persistent problem. In this work, we compare the following schemes used to solve the nonlinear simultaneous equations of an RHD algorithm with the flux-limited diffusion approximation: the Newton–Raphson (NR) method, operator splitting, and linearization (LIN), from the perspective of the computational cost involved. For operator splitting, in addition to the traditional simple operator splitting (SOS) scheme, we examined the scheme developed by Douglas and Rachford (DROS). We solve three test problems (the thermal relaxation mode, the relaxation and the propagation of linear waves, and radiating shock) using these schemes and then compare their dependence on the time step size. As a result, we find the conditions of the time step size necessary for adopting each scheme. The LIN scheme is superior to other schemes if the ratio of radiation pressure to gas pressure is sufficiently low. On the other hand, DROS can be the most efficient scheme if the ratio is high. Although the NR scheme can be adopted independently of the regime, especially in a problem that involves optically thin regions, the convergence tends to be worse. In all cases, SOS is not practical.

  4. Sedation for procedures outside the operating room in children

    International Nuclear Information System (INIS)

    Molina Rodriguez, Ericka

    2014-01-01

    Sedation is defined in the pediatric population. An adequate preoperative assessment is established in patients subjected to a sedation. Fundamental characteristics of drugs used during a sedation are determined. Recommendations about surveillance and monitoring are established in a patient sedated. Principal characteristics of sedation are defined in patients exposed to radiological diagnostic and therapeutic procedures. Considerations in sedation are identified for procedures in the laboratory of digestive endoscopy. Alternatives of sedation are mentioned for oncological patients subjected to invasive procedures. Working conditions and specifications of anesthesia are determined in the cardiac catheterization room [es

  5. Apollo-Soyuz test project. Operations handbook command/service/docking modules (CSM 119/DM 1): Operational procedures reference issue

    Science.gov (United States)

    1974-01-01

    Operational and configuration checks for the Apollo-Soyuz Test Project are presented. The checks include: backup crew prelaunch, prime crew prelaunch, boost and insertion, G and C reference data, G and N reference modes, rendezvous, navigation, Apollo-Soyuz operations, abort procedures, and emergency procedures.

  6. Coherent Synchrotron Radiation A Simulation Code Based on the Non-Linear Extension of the Operator Splitting Method

    CERN Document Server

    Dattoli, Giuseppe

    2005-01-01

    The coherent synchrotron radiation (CSR) is one of the main problems limiting the performance of high intensity electron accelerators. A code devoted to the analysis of this type of problems should be fast and reliable: conditions that are usually hardly achieved at the same time. In the past, codes based on Lie algebraic techniques have been very efficient to treat transport problem in accelerators. The extension of these method to the non-linear case is ideally suited to treat CSR instability problems. We report on the development of a numerical code, based on the solution of the Vlasov equation, with the inclusion of non-linear contribution due to wake field effects. The proposed solution method exploits an algebraic technique, using exponential operators implemented numerically in C++. We show that the integration procedure is capable of reproducing the onset of an instability and effects associated with bunching mechanisms leading to the growth of the instability itself. In addition, parametric studies a...

  7. Evaluation of nuclear power plant operating procedures classifications and interfaces: Problems and techniques for improvement

    International Nuclear Information System (INIS)

    Barnes, V.E.; Radford, L.R.

    1987-02-01

    This report presents activities and findings of a project designed to evaluate current practices and problems related to procedure classification schemes and procedure interfaces in commercial nuclear power plants. The phrase ''procedure classification scheme'' refers to how plant operating procedures are categorized and indexed (e.g., normal, abnormal, emergency operating procedures). The term ''procedure interface'' refers to how reactor operators are instructed to transition within and between procedures. The project consisted of four key tasks, including (1) a survey of literature regarding problems associated with procedure classifications and interfaces, as well as techniques for overcoming them; (2) interviews with experts in the nuclear industry to discuss the appropriate scope of different classes of operating procedures and techniques for managing interfaces between them; (3) a reanalysis of data gathered about nuclear power plant normal operating and off-normal operating procedures in a related project, ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants''; and (4) solicitation of the comments and expert opinions of a peer review group on the draft project report and on proposed techniques for resolving classification and interface issues. In addition to describing these activities and their results, recommendations for NRC and utility actions to address procedure classification and interface problems are offered

  8. Identifying cognitive complexity factors affecting the complexity of procedural steps in emergency operating procedures of a nuclear power plant

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jeong, Kwangsup; Jung, Wondea

    2005-01-01

    In complex systems such as a nuclear and chemical plant, it is well known that the provision of understandable procedures that allow operators to clarify what needs to be done and how to do it is one of the requisites to secure their safety. As a previous study in providing understandable procedures, the step complexity (SC) measure that can quantify the complexity of procedural steps in emergency operating procedures (EOPs) of a nuclear power plant (NPP) was suggested. However, the necessity of additional complexity factors that can consider a cognitive aspect in evaluating the complexity of procedural steps is raised. To this end, the comparisons between operators' performance data measured by the form of a step performance time with their behavior in carrying out the prescribed activities of procedural steps are conducted in this study. As a result, two kinds of complexity factors (the abstraction level of knowledge and the level of engineering decision) that could affect an operator's cognitive burden are identified. Although a well-designed experiment is indispensable for confirming the appropriateness of the additional complexity factors, it is strongly believed that the change of operators' performance data can be more authentically explained if the additional complexity factors are taken into consideration

  9. Identifying cognitive complexity factors affecting the complexity of procedural steps in emergency operating procedures of a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jinkyun [Integrated Safety Assessment Division, Korea Atomic Energy Research Institute, P.O. Box 105, Duckjin-Dong, Yusong-Ku, Taejon 305-600 (Korea, Republic of)]. E-mail: kshpjk@kaeri.re.kr; Jeong, Kwangsup [Integrated Safety Assessment Division, Korea Atomic Energy Research Institute, P.O. Box 105, Duckjin-Dong, Yusong-Ku, Taejon 305-600 (Korea, Republic of); Jung, Wondea [Integrated Safety Assessment Division, Korea Atomic Energy Research Institute, P.O. Box 105, Duckjin-Dong, Yusong-Ku, Taejon 305-600 (Korea, Republic of)

    2005-08-01

    In complex systems such as a nuclear and chemical plant, it is well known that the provision of understandable procedures that allow operators to clarify what needs to be done and how to do it is one of the requisites to secure their safety. As a previous study in providing understandable procedures, the step complexity (SC) measure that can quantify the complexity of procedural steps in emergency operating procedures (EOPs) of a nuclear power plant (NPP) was suggested. However, the necessity of additional complexity factors that can consider a cognitive aspect in evaluating the complexity of procedural steps is raised. To this end, the comparisons between operators' performance data measured by the form of a step performance time with their behavior in carrying out the prescribed activities of procedural steps are conducted in this study. As a result, two kinds of complexity factors (the abstraction level of knowledge and the level of engineering decision) that could affect an operator's cognitive burden are identified. Although a well-designed experiment is indispensable for confirming the appropriateness of the additional complexity factors, it is strongly believed that the change of operators' performance data can be more authentically explained if the additional complexity factors are taken into consideration.

  10. Identifying cognitive complexity factors affecting the complexity of procedural steps in emergency operating procedures of a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Jinkyun Park; Kwangsup Jeong; Wondea Jung [Korea Atomic Energy Research Institute, Taejon (Korea). Integrated Safety Assessment Division

    2005-08-15

    In complex systems such as a nuclear and chemical plant, it is well known that the provision of understandable procedures that allow operators to clarify what needs to be done and how to do it is one of the requisites to secure their safety. As a previous study in providing understandable procedures, the step complexity (SC) measure that can quantify the complexity of procedural steps in emergency operating procedures (EOPs) of a nuclear power plant (NPP) was suggested. However, the necessity of additional complexity factors that can consider a cognitive aspect in evaluating the complexity of procedural steps is raised. To this end, the comparisons between operator' performance data measured by the form of a step performance time with their behavior in carrying out the prescribed activities of procedural steps are conducted in this study. As a result, two kinds of complexity factors (the abstraction level of knowledge and the level of engineering decision) that could affect an operator's cognitive burden are identified. Although a well-designed experiment is indispensable for confirming the appropriateness of the additional complexity factors, it is strongly believed that the change of operators' performance data can be more authentically explained if the additional complexity factors are taken into consideration. (author)

  11. A Neural Networks Based Operation Guidance System for Procedure Presentation and Validation

    International Nuclear Information System (INIS)

    Seung, Kun Mo; Lee, Seung Jun; Seong, Poong Hyun

    2006-01-01

    In this paper, a neural network based operator support system is proposed to reduce operator's errors in abnormal situations in nuclear power plants (NPPs). There are many complicated situations, in which regular and suitable operations should be done by operators accordingly. In order to regulate and validate operators' operations, it is necessary to develop an operator support system which includes computer based procedures with the functions for operation validation. Many computerized procedures systems (CPS) have been recently developed. Focusing on the human machine interface (HMI) design and procedures' computerization, most of CPSs used various methodologies to enhance system's convenience, reliability and accessibility. Other than only showing procedures, the proposed system integrates a simple CPS and an operation validation system (OVS) by using artificial neural network (ANN) for operational permission and quantitative evaluation

  12. Manual for the GAW Precipitation Chemistry Programme: Guidelines, Data Quality Objectives and Standard Operating Procedures

    National Research Council Canada - National Science Library

    Allan, Mary A

    2004-01-01

    This is a manual for the Global Atmosphere Watch Precipitation Chemistry (GAW-PC) Programme. Where possible, it describes standard operating procedures and otherwise provides guidance on methods and procedures...

  13. 7 CFR 70.110 - Requirements for sanitation, facilities, and operating procedures in official plants.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Requirements for sanitation, facilities, and operating... Requirements for sanitation, facilities, and operating procedures in official plants. (a) The requirements for sanitation, facilities, and operating procedures in official plants shall be the applicable provisions stated...

  14. Standard operating procedure for combustion of 14C - samples with OX-500 biological material oxidizer

    International Nuclear Information System (INIS)

    Nashriyah Mat.

    1995-01-01

    This procedure is for the purpose of safe operation of OX-500 biological material oxidizer. For ease of operation, the operation flow chart (including testing the system and sample combustion) and end of day maintenance flow chart were simplified. The front view, diagrams and switches are duly copied from operating manual. Steps on sample preparation are also included for biotic and a biotic samples. This operating procedure is subjected to future reviews

  15. The Splitting Loope

    Science.gov (United States)

    Wilkins, Jesse L. M.; Norton, Anderson

    2011-01-01

    Teaching experiments have generated several hypotheses concerning the construction of fraction schemes and operations and relationships among them. In particular, researchers have hypothesized that children's construction of splitting operations is crucial to their construction of more advanced fractions concepts (Steffe, 2002). The authors…

  16. The Splitting Group

    Science.gov (United States)

    Norton, Anderson; Wilkins, Jesse L. M.

    2012-01-01

    Piagetian theory describes mathematical development as the construction and organization of mental operations within psychological structures. Research on student learning has identified the vital roles of two particular operations--splitting and units coordination--play in students' development of advanced fractions knowledge. Whereas Steffe and…

  17. Developing operating procedures for a low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    Sutherland, A.A.; Miner, G.L.; Grahn, K.F.; Pollard, C.G.

    1993-10-01

    This document is intended to assist persons who are developing operating and emergency procedures for a low-level radioactive waste disposal facility. It provides 25 procedures that are considered to be relatively independent of the characteristics of a disposal facility site, the facility design, and operations at the facility. These generic procedures should form a good starting point for final procedures on their subjects for the disposal facility. In addition, this document provides 55 annotated outlines of other procedures that are common to disposal facilities. The annotated outlines are meant as checklists to assist the developer of new procedures

  18. Developing operating procedures for a low-level radioactive waste disposal facility

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, A.A.; Miner, G.L.; Grahn, K.F.; Pollard, C.G. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

    1993-10-01

    This document is intended to assist persons who are developing operating and emergency procedures for a low-level radioactive waste disposal facility. It provides 25 procedures that are considered to be relatively independent of the characteristics of a disposal facility site, the facility design, and operations at the facility. These generic procedures should form a good starting point for final procedures on their subjects for the disposal facility. In addition, this document provides 55 annotated outlines of other procedures that are common to disposal facilities. The annotated outlines are meant as checklists to assist the developer of new procedures.

  19. Technical operations procedure for assembly and emplacement of the soil temperature test--test assembly

    International Nuclear Information System (INIS)

    Weber, A.P.

    1978-01-01

    A description is given of the plan for assembly, instrumentation, emplacement, and operational checkout of the soil temperature test assembly and dry well liner. The activities described cover all operations necessary to accomplish the receiving inspection, instrumentation and pre-construction handling of the dry well liner, plus all operations performed with the test article. Actual details of construction work are not covered by this procedure. Each part and/or section of this procedure is a separate function to be accomplished as required by the nature of the operation. The organization of the procedure is not intended to imply a special operational sequence or schedular requirement. Specific procedure operational sections include: receiving inspection; liner assembly operations; construction operations (by others); prepare shield plug; test article assembly and installation; and operational checkout

  20. Integrating standard operating procedures with spacecraft automation, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Spacecraft automation has the potential to assist crew members and spacecraft operators in managing spacecraft systems during extended space missions. Automation can...

  1. Energy-based operator splitting approach for the time discretization of coupled systems of partial and ordinary differential equations for fluid flows: The Stokes case

    Science.gov (United States)

    Carichino, Lucia; Guidoboni, Giovanna; Szopos, Marcela

    2018-07-01

    The goal of this work is to develop a novel splitting approach for the numerical solution of multiscale problems involving the coupling between Stokes equations and ODE systems, as often encountered in blood flow modeling applications. The proposed algorithm is based on a semi-discretization in time based on operator splitting, whose design is guided by the rationale of ensuring that the physical energy balance is maintained at the discrete level. As a result, unconditional stability with respect to the time step choice is ensured by the implicit treatment of interface conditions within the Stokes substeps, whereas the coupling between Stokes and ODE substeps is enforced via appropriate initial conditions for each substep. Notably, unconditional stability is attained without the need of subiterating between Stokes and ODE substeps. Stability and convergence properties of the proposed algorithm are tested on three specific examples for which analytical solutions are derived.

  2. A three operator split-step method covering a larger set of non-linear partial differential equations

    Science.gov (United States)

    Zia, Haider

    2017-06-01

    This paper describes an updated exponential Fourier based split-step method that can be applied to a greater class of partial differential equations than previous methods would allow. These equations arise in physics and engineering, a notable example being the generalized derivative non-linear Schrödinger equation that arises in non-linear optics with self-steepening terms. These differential equations feature terms that were previously inaccessible to model accurately with low computational resources. The new method maintains a 3rd order error even with these additional terms and models the equation in all three spatial dimensions and time. The class of non-linear differential equations that this method applies to is shown. The method is fully derived and implementation of the method in the split-step architecture is shown. This paper lays the mathematical ground work for an upcoming paper employing this method in white-light generation simulations in bulk material.

  3. Standing operating procedures for developing acute exposure guideline levels for hazardous chemicals

    National Research Council Canada - National Science Library

    National Research Council (U.S.). Subcommittee on Acute Exposure Guideline Levels

    2001-01-01

    Standing Operating Procedures for Developing Acute Exposure Guideline Levels for Hazardous Chemicals contains a detailed and comprehensive methodology for developing acute exposure guideline levels (AEGLs...

  4. 76 FR 78814 - National Voluntary Laboratory Accreditation Program; Operating Procedures

    Science.gov (United States)

    2011-12-20

    ... procedures were published to ensure their consistency with certain international standards and guidance... is amending the last sentence in section 285.4 as follows: change the third instance of the word ``and'' to ``or,'' and add the words ``to ensure open participation'' after the phrase ``other means...

  5. Operability test procedure for the TK-900 effluent monitoring station

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    This procedure will verify that the 221-B liquid effluent monitoring system, installed near the east end of the 6-in. chemical sewer header, functions as intended by design. TK-900B was installed near stairwell 3 in the 221-B electrical gallery by Project W-007H. The system is part of BAT/AKART for the BCE liquid effluent system

  6. 40 CFR 240.209-3 - Recommended procedures: Operations.

    Science.gov (United States)

    2010-07-01

    ... Occupational Respiratory Disease, National Institute for Occupational Safety and Health, Morgantown, W. Va. (c) Training in first aid practices and emergency procedures should be given all personnel. (d) Personal safety devices such as hard hats, gloves, safety glasses, and footwear should be provided for facility employees...

  7. Development of an automated operating procedure system using fuzzy colored petri nets for nuclear power plants

    International Nuclear Information System (INIS)

    Lee, Seung Jun; Seong, Poong Hyun

    2002-01-01

    In this work, AuTomated Operating Procedure System (ATOPS) is developed. ATOPS is an automation system for operation of a nuclear power plant (NPP) which can monitor signals, diagnose statuses, and generate control actions according to corresponding operating procedures, without any human operator's help. Main functions of ATOPS are anomaly detection function and procedure execution function, but only the procedure execution function is implemented because this work is just the first step. In the procedure execution function, operating procedures of NPP are analyzed and modeled using Fuzzy Colored Petri Nets (FCPN), and executed depending on decision making of the inference engine. In this work, an ATOPS prototype is developed in order to demonstrate its feasibility and it is also validated using FISA-2/WS simulator. The validation is performed for the cases of a loss of coolant accident (LOCA) and a steam generator tube rupture (SGTR). The simulation results show that ATOPS works correctly in the emergency situations

  8. Operability test procedure for 244-U DCRT. Revision 1

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    This OPT will insure the operability of various systems and their general equipment, used in the operation of the 244-U DCRT. Systems that will be tested include the following: Leak Detection Systems; Heat Trace System; Vessel Temperature Measurement System; Dip Tube Water System; Weight Factor and Specific Gravity System; Instrument Air System; Vessel Liquid Level System; Vessel Liquid Transfer System; and Exhauster Differential Pressure Indicating Controller System. The tests will cover checks on equipment operation and electrical interlocks, but will not cover checks on associated annunciator alarms which are covered in a separate OTP

  9. Operability test procedure for the Rotary Mode Core Sampling System Exhausters 3 and 4

    International Nuclear Information System (INIS)

    WSaldo, E.J.

    1995-01-01

    This document provides a procedure for performing operability testing of the Rotary Mode Core Sampling System Exhausters 3 ampersand 4. Upon completion of testing activities an operability testing report will be issued

  10. Procedures and practices for day-to-day operation

    International Nuclear Information System (INIS)

    Distler, K.

    1986-01-01

    This lecture deals with problems of safe plant operation under day-to-day conditions. Operation, maintenance and surveillance have to be organized in a preventive manner. It will be shown that nearly all expected jobs and proceedings can be done rule-based. The connection of documentation and work preparation will be lined out. Moreover, the need for control and quality assurance for nearly all proceedings will be pointed out. The question of communication and scheduling will be touched. (orig.)

  11. Non-perturbative renormalization of the chromo-magnetic operator in heavy quark effective theory and the B{sup *} - B mass splitting

    Energy Technology Data Exchange (ETDEWEB)

    Guazzini, D.; Sommer, R. [Deutsches Elektronen-Synchrotron (DESY), Zeuthen (Germany); Meyer, H. [Massachusetts Institute of Technology, Cambridge, MA (United States). Center for Theoretical Physics

    2007-05-15

    We carry out the non-perturbative renormalization of the chromo-magnetic operator in Heavy Quark Effective Theory. At order 1/m of the expansion, the operator is responsible for the mass splitting between the pseudoscalar and vector B mesons. We obtain its two-loop anomalous dimension in a Schroedinger functional scheme by successive oneloop conversions to the lattice MS scheme and the MS scheme. We then compute the scale evolution of the operator non-perturbatively in the N{sub f}=0 theory between {mu} {approx}0.3 GeV and {mu} {approx}100 GeV, where contact is made with perturbation theory. The overall renormalization factor that converts the bare lattice operator to its renormalization group invariant form is given for the Wilson gauge action and two standard discretizations of the heavy-quark action. As an application, we find that this factor brings the previous quenched predictions of the B{sup *}-B mass splitting closer to the experimental value than found with a perturbative renormalization. The same renormalization factor is applicable to the spin-dependent potentials of Eichten and Feinberg. (orig.)

  12. Effective and efficient learning in the operating theater with intraoperative video-enhanced surgical procedure training

    NARCIS (Netherlands)

    van Det, M.J.; Meijerink, W.J.; Hoff, C.; Middel, B.; Pierie, J.P.

    INtraoperative Video Enhanced Surgical procedure Training (INVEST) is a new training method designed to improve the transition from basic skills training in a skills lab to procedural training in the operating theater. Traditionally, the master-apprentice model (MAM) is used for procedural training

  13. Procedures for the systematic appraisal of operational radiation protection programmes

    International Nuclear Information System (INIS)

    1987-09-01

    The purpose of this document is to give guidance to management and regulators of organisations using ionizing radiations on a technique for systematically appraising their operational radiation protection programme in order that its adequacy and effectiveness can be objectively determined. The appraisal technique is based on analytical trees and can be used to examine either a whole programme, to determine its completion and adequacy or to examine one component of a programme in considerable detail. This document will not develop technical recommendations on particular radiation protection programmes. These will be found in the appropriate Safety Series document on operational radiation protection. 8 refs, figs

  14. 76 FR 54528 - Standard Operating Procedures (SOP) of the Aircraft Certification Service (AIR) Process for the...

    Science.gov (United States)

    2011-09-01

    ...) of the Aircraft Certification Service (AIR) Process for the Sequencing of Certification and... on the Aircraft Certification Service (AIR) standard operating procedure (SOP) describing the process... comments on the SOP : AIR-100-001; Standard Operating Procedure--Aircraft Certification Service Project...

  15. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to 354.247...

  16. The Pajarito Site operating procedures for the Los Alamos Critical Experiments Facility

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1991-12-01

    Operating procedures consistent with DOE Order 5480.6, and the American National Standard Safety Guide for the Performance of Critical Experiments are defined for the Los Alamos Critical Experiments Facility (LACEF) of the Los Alamos National Laboratory. These operating procedures supersede and update those previously published in 1983 and apply to any criticality experiment performed at the facility. 11 refs

  17. A toolkit for computerized operating procedure of complex industrial systems with IVI-COM technology

    International Nuclear Information System (INIS)

    Zhou Yangping; Dong Yujie; Huang Xiaojing; Ye Jingliang; Yoshikawa, Hidekazu

    2013-01-01

    A human interface toolkit is proposed to help the user develop computerized operating procedure of complex industrial system such as Nuclear Power Plants (NPPs). Coupled with a friendly graphical interface, this integrated tool includes a database, a procedure editor and a procedure executor. A three layer hierarchy is adopted to express the complexity of operating procedure, which includes mission, process and node. There are 10 kinds of node: entrance, exit, hint, manual input, detector, actuator, data treatment, branch, judgment and plug-in. The computerized operating procedure will sense and actuate the actual industrial systems with the interface based on IVI-COM (Interchangeable Virtual Instrumentation-Component Object Model) technology. A prototype system of this human interface toolkit has been applied to develop a simple computerized operating procedure for a simulated NPP. (author)

  18. 40 CFR 240.208-3 - Recommended procedures: Operations.

    Science.gov (United States)

    2010-07-01

    ... the quality of the bottom ash at least twice per shift and record in the operating log the estimated percentage of unburned combustibles. (b) If residue or fly ash is collected in a wet condition, it should be drained of free moisture. Transportation of residue and fly ash should be by means that prevent the loads...

  19. 21 CFR 58.81 - Standard operating procedures.

    Science.gov (United States)

    2010-04-01

    ...) Data handling, storage, and retrieval. (11) Maintenance and calibration of equipment. (12) Transfer... LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Testing Facilities Operation § 58.81 Standard... forth nonclinical laboratory study methods that management is satisfied are adequate to insure the...

  20. Effective and efficient learning in the operating theater with intraoperative video-enhanced surgical procedure training

    OpenAIRE

    van Det, M.J.; Meijerink, W.J.; Hoff, C.; Middel, B.; Pierie, J.P.

    2013-01-01

    INtraoperative Video Enhanced Surgical procedure Training (INVEST) is a new training method designed to improve the transition from basic skills training in a skills lab to procedural training in the operating theater. Traditionally, the master-apprentice model (MAM) is used for procedural training in the operating theater, but this model lacks uniformity and efficiency at the beginning of the learning curve. This study was designed to investigate the effectiveness and efficiency of INVEST co...

  1. Procedure for operating a heavy water cooled power reactor

    International Nuclear Information System (INIS)

    Rau, P.; Kumpf, H.

    1981-01-01

    Nuclear reactors cooled by heavy water usually have equipment for fuel element exchange during operation, with the primary circuit remaining contained. This fuel element exchange equipment is expensive and complicated in many respects. According to the invention, the heavy water is therefore replaced by light water after a certain time of operation in such way that light water is led in and heavy water is led off. After the replacement, at least a quarter of the fuel elements of the reactor core is exchanged with the reactor pressure vessel being open. Then the light water serving as a shielding is replaced by heavy water, with the reactor pressure vessel being closed. The invention is of interest particularly for high-conversion reactors. (orig.) [de

  2. Study of operating procedures in nuclear power plants: Practices and problems

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; McGuire, M.V.; Radford, L.R.; Wheeler, W.A.

    1987-02-01

    This report describes the project activities, findings, and recommendations of a project entitled ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants.'' The project was performed by the Pacific Northwest Laboratory and Battelle Human Affairs Research Centers for the Division of Human Factors Technology, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission (NRC). The project team analyzed and evaluated samples of normal and abnormal operating procedures from 31 commercial nuclear power plant sites operating in the United States. The project team also visited nine nuclear power plants in the United States to obtain information on the development, use, and control of operating procedures. A peer review group was convened to advise the project team on the conduct of the project and to review and comment on the project report. The report contains findings on the usability of operating procedures and on practices concerning the development, use, an control of operating procedures in nuclear power plants. The report includes recommendations to the NRC on the need to upgrade the quality of operating procedures. The report also discusses an approach to a program plan to assess and upgrade operating procedures

  3. Operability test procedure for TRUSAF assayer software upgrade

    International Nuclear Information System (INIS)

    Cejka, C.C.

    1995-01-01

    This OTP is to be used to ensure the operability of the Transuranic Waste Assay System (TRUWAS). The system was upgraded and requires a retest to assure satisfactory operation. The upgrade consists of an AST 486 computer to replace the IBM-PC/XT, and a software upgrade (CNEUT). The software calculations are performed in the same manner as in the previous system (NEUT), however, the new software is written in C Assembly Language. CNEUT is easier to use and far more powerful than the previous program. The TRUWAS is used to verify the TRU content of waste packages sent for storage in the Transuranic Storage and Assay Facility (TRUSAF). The TRUSAF is part of Westinghouse Hanford's certification program for waste to be shipped to the Waste Isolation Pilot Plant (WIPP) in New Mexico. The Transuranic Waste Assayer uses a combination passive-active neutron interrogation system to determine the TRU content of 55-gallon waste drums. The system consists of a shielded assay chamber; Deuterium-Tritium neutron generator; Helium-3 proportional counters; drum handling system; electronics including preamplifier, amplifier, and discriminator for each of the counter packages; and an AST 486 computer/printer system for data acquisition and analysis. The system can detect down to TRU levels of 10 nCi/g in the waste matrix. The equipment to be tested is: Assay Chamber Door Drum Turntable and Automatic Loading Platform Interlocks Assayer Software; and IBM computer/printer software. The objective of the test is to verify that the system is operational with the AST 486 computer, the software used in the new computer system correctly calculates TRU levels, and the new computer system is capable of storing and retrieving data

  4. Guidelines for the presentation of emergency operating procedures using advanced information technology

    International Nuclear Information System (INIS)

    Green, M.; Hollnagel, E.; Niwa, Yuji

    1994-01-01

    New methods of information presentation and interface design are changing the conditions for work in the modern NPP control room. One area receiving considerable attention is that of Emergency Operating Procedures (EOP). Conventionally such procedures are presented using hard copy manuals; however, development in IT means that there are new opportunities for the computerization of such procedures. This paper reports on the development of human factors guidelines for the computerized presentation of EOPs. After identifying the principle stages in the transition from procedures as documents to fully automated procedures, computerised procedure presentation is briefly discussed. Guidelines for the presentation of such procedures are outlined starting with the high level goals for guidelines themselves. Such goals also constitute the criteria against which the computerized procedures are measured during implementation. Six dimensions describing computerized procedure presentation are presented and two are explore in more detail by identifying points along each dimension that characterize different levels of IT sophistication. (author). 8 refs, 1 tab

  5. In-situ burn operational procedures development exercises

    International Nuclear Information System (INIS)

    Bitting, K.; Gynther, J.; Drieu, M.; Tidemann, A.; Martin, R.

    2001-01-01

    The United States Coast Guard, the Texas General Land Office and the National Response Corporation conducted three at-sea oil spill exercises in 1999 and 2000 to test and evaluate a variety of methods to perform in-situ burning (ISB) operations at sea. ISB is seldom used during actual responses, particularly in offshore environments because there is no detailed ISB operation plan for specific regional response teams. There is also a lack of sufficient ISB resources, both equipment and trained personnel, that can be mobilized within the limited ISB window-of-opportunity. There is also a misconception regarding the costs and benefits of ISB. For these exercises, the oil slick was simulated with several tons of oranges. The primary objective was to examine the safe, effective and efficient implementation of ISB. The exercises involved the use of actual response vessels, water-cooled fire booms, helicopters and helitorches. Specific manoeuvres were conducted and particular activities were measured. The experimental data was recorded for future use as a planning and training tool. The exercises demonstrated that ISB is a viable and efficient response tool if it is used in the right situation. The biggest short fall of these exercises was the inability to burn real oil on the water (the oranges did not provide enough data). It was concluded that ISB is not always the best tool for every situation. Dispersants and mechanical recovery are also viable options. 1 tab., 6 figs

  6. Operative fixation of chest wall fractures: an underused procedure?

    Science.gov (United States)

    Richardson, J David; Franklin, Glen A; Heffley, Susan; Seligson, David

    2007-06-01

    Chest wall fractures, including injuries to the ribs and sternum, usually heal spontaneously without specific treatment. However, a small subset of patients have fractures that produce overlying bone fragments that may produce severe pain, respiratory compromise, and, if untreated mechanically, result in nonunion. We performed open reduction and internal fixation on seven patients with multiple rib fractures-five in the initial hospitalization and two delayed--as well as 35 sternal fractures (19 immediate fixation and 16 delayed). Operative fixation was accomplished using titanium plates and screws in both groups of patients. All patients with rib fractures did well; there were no major complications or infections, and no plates required removal. Clinical results were excellent. There was one death in the sternal fracture group in a patient who was ventilator-dependent preoperatively and extubated himself in the early postoperative period. Otherwise, the results were excellent, with no complications occurring in this group. Three patients had their plates removed after boney union was achieved. No evidence of infection or nonunion occurred. The excellent results achieved in the subset of patients with severe chest wall deformities treated initially at our institution and those referred from outside suggest that operative fixation is a useful modality that is likely underused.

  7. Manpower development for safe operation of nuclear power plant. China. Emergency operating procedures. Activity: 5.1.4-Task-11. Technical report

    International Nuclear Information System (INIS)

    Walsh, L.A.

    1994-01-01

    This report covers the period of engagement from July 11, 1994 through July 22, 1994. The events and topics of discussion are as follows: History of Emergency Operating Procedure EOP Development; Emergency Operating Procedures (Event Based, Critical Safe Function Status Trees and Functional Recovery Response Procedures); Transition from Emergency Operating Procedures to Severe Accident Management Guidelines

  8. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  9. Splitting Descartes

    DEFF Research Database (Denmark)

    Schilhab, Theresa

    2007-01-01

    Kognition og Pædagogik vol. 48:10-18. 2003 Short description : The cognitivistic paradigm and Descartes' view of embodied knowledge. Abstract: That the philosopher Descartes separated the mind from the body is hardly news: He did it so effectively that his name is forever tied to that division....... But what exactly is Descartes' point? How does the Kartesian split hold up to recent biologically based learning theories?...

  10. 50 CFR 260.103 - Operations and operating procedures shall be in accordance with an effective sanitation program.

    Science.gov (United States)

    2010-10-01

    ... be in accordance with an effective sanitation program. 260.103 Section 260.103 Wildlife and Fisheries... Operations and operating procedures shall be in accordance with an effective sanitation program. (a) All..., choppers, and containers which fail to meet appropriate and adequate sanitation requirements will be...

  11. Procedures for self-assessment of operational safety

    International Nuclear Information System (INIS)

    1997-08-01

    Self-assessment processes have been continuously developed by nuclear organizations, including nuclear power plants. Currently, the nuclear industry and governmental organizations are showing an increasing interest in the implementation of this process as an effective way for improving safety performance. Self-assessment involves the use of different types of tools and mechanisms to assist the organizations in assessing their own safety performance against given standards. This helps to enhance the understanding of the need for improvements, the feeling of ownership in achieving them and and the safety culture as a whole. The concepts developed in this report present the basic approach to self-assessment taking into consideration experience gained during Operational Safety Review Team (OSART) missions, from organizations and utilities which have successfully implemented parts of a self-assessment programme and from meetings organized to discuss the subject

  12. Experimental studies of computerized procedures and team size in nuclear power plant operations

    International Nuclear Information System (INIS)

    Huang, F.-H.; Hwang, S.-L.

    2009-01-01

    The operation of a nuclear power plant is so complex that it requires teamwork. To support team performance, a system need to provide all team members integrated information displays as well as decision aids (e.g., computerized procedures). Two experiments were conducted to investigate the effects of computerized procedures and team size on operating performance. Forty-five participants were involved in the experiments. Each participant executed decision and action tasks to deal with alarm signals, while detecting occasional system errors in the interface. Results showed that effects of computerized procedures were significant on various performance indicators, such as operation time, operation errors, and learning effect, and that two operators would be a satisfactory size in the teamwork system providing computerized procedures

  13. Intra-operative removal of chest tube in video-assisted thoracoscopic procedures

    Directory of Open Access Journals (Sweden)

    Moustafa M. El-Badry

    2017-12-01

    Conclusions: Intra-operative removal of chest tube during VATS procedures was a safe technique in well selected patients with an intra-operative successful air-leak test with radiological and clinical follow-up. This technique provided lesser post-operative pain with shorter hospital stay.

  14. 49 CFR 195.402 - Procedural manual for operations, maintenance, and emergencies.

    Science.gov (United States)

    2010-10-01

    ... operating conditions by monitoring pressure, temperature, flow or other appropriate operational data and...) Minimization of public exposure to injury and probability of accidental ignition by assisting with evacuation... SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Operation and Maintenance § 195.402 Procedural...

  15. Use of Minicameras to Improve Operative Procedure in Security Forces.

    Science.gov (United States)

    Clemente-Suárez, Vicente Javier; Diaz-Manzano, Montaña; Robles-Pérez, José Juan

    2017-09-01

    The aim of the present study was to analyze pistol and compact rifle marksmanship in close quarter combat (CQC). There is currently a controversy about what weapon is most appropriate to use in CQC, short weapon as pistols or long weapons as rifle. Forty two participants conducted two close quarter combat simulations, one with pistol and one with compact rifle. Marksmanship and time to cover the simulation were measured. Data obtained showed no significant differences between pistol and compact rifle. In addition, it was observed a tendency to obtain higher scores with compact rifle, probably be due to the higher stability provided in the shot action. Compact rifle could be an effective election in actual theaters of operation in which asymmetrical and symmetrical combat are combined and also in police interventions due to compact rifle provide higher fire power and range and obtained the same shooting performance than pistol. To the best of our knowledge this is the first study that provides empirical data to solve the discussion about the efficiency of the use of rifle and pistol in close quarter combat in military and police interventions. These results could be used to improve the military and police interventions efficiency.

  16. Hand washing in operating room: a procedural comparison

    Directory of Open Access Journals (Sweden)

    Alessia Stilo

    2016-09-01

    Full Text Available BACKGROUND Hand washing has been considered a measure of personal hygiene for centuries and it is known that an improper hand hygiene by healthcare workers is responsible for about 40% of nosocomial infections. Therefore, surgical hand preparation is a critical element for healthcare safety in order to reduce microbial contamination of  surgical wound in case of non detected break of the gloves. The aim of our study is to evaluate the efficacy three antiseptics: Povi-iodine scrub; EPG (Ethanol, Hydrogen Peroxide, Glycerol, recommended by WHO, and common marseille soap type in a liquid formulation. METHODS It was designed a randomized, double-blind, single-center study conducted in the University Hospital of Messina, from January to June 2013. We asked operators to put the fingertips of their right hand (if not left-handed for one minute on the PCA medium, before washing with the three types of antiseptics, and after washing and drying. Drying was made using sterile gauzes or disposable wipes. Then, we measured the number of colony forming units per mL (CFU/mL and calculated the percentage of microbial load reduction. RESULTS 211 samples have been considered for statistical analysis: in 42 samples, in fact, initial microbial load was lower than after washing. Washing with EPG reduced CFU/ml from  a mean of 38,9 to 4,1 (86,5% reduction, washing with povi-iodine scrub from 59,55 to 12,9 (75,9% reduction and washing with Marseille soap from 47,26 to 12,7 (64,3% reduction. CONCLUSIONS Our study shows that washing with EPG has superior efficacy in CFU reduction. Antiseptic hand washing, however, cannot be considered the only measure to reduce infections: the anomaly of some results (initial microbial load lower than after washing  demonstrates that drying is an essential phase in the presurgical preparation. Therefore, hand hygiene must be part of a more complex strategy of surveillance and control of nosocomial infections

  17. Procedure for generating steam and steam generator for operating said procedure

    International Nuclear Information System (INIS)

    Chlique, Bernard.

    1975-01-01

    This invention concerns the generation of steam by bringing the water to be vaporised into indirect thermal exchange relation with the heating steam which condenses when passing in series, along alternate routes, through bundles of tubes immersed in a vaporising chamber. A number of steam generators working on this principle already exist. The purpose of the invention is to modify the operating method of these steam generators by means of a special disposition making it possible to build a compact unit including an additional bundle of tubes heated by the condensates collected at the outlet of each bundle through which the heating steam passes [fr

  18. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  19. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  20. Safety Precautions and Operating Procedures in an (A)BSL-4 Laboratory: 4. Medical Imaging Procedures.

    Science.gov (United States)

    Byrum, Russell; Keith, Lauren; Bartos, Christopher; St Claire, Marisa; Lackemeyer, Matthew G; Holbrook, Michael R; Janosko, Krisztina; Barr, Jason; Pusl, Daniela; Bollinger, Laura; Wada, Jiro; Coe, Linda; Hensley, Lisa E; Jahrling, Peter B; Kuhn, Jens H; Lentz, Margaret R

    2016-10-03

    Medical imaging using animal models for human diseases has been utilized for decades; however, until recently, medical imaging of diseases induced by high-consequence pathogens has not been possible. In 2014, the National Institutes of Health, National Institute of Allergy and Infectious Diseases, Integrated Research Facility at Fort Detrick opened an Animal Biosafety Level 4 (ABSL-4) facility to assess the clinical course and pathology of infectious diseases in experimentally infected animals. Multiple imaging modalities including computed tomography (CT), magnetic resonance imaging, positron emission tomography, and single photon emission computed tomography are available to researchers for these evaluations. The focus of this article is to describe the workflow for safely obtaining a CT image of a live guinea pig in an ABSL-4 facility. These procedures include animal handling, anesthesia, and preparing and monitoring the animal until recovery from sedation. We will also discuss preparing the imaging equipment, performing quality checks, communication methods from "hot side" (containing pathogens) to "cold side," and moving the animal from the holding room to the imaging suite.

  1. Situation awareness and trust in computer-based procedures in nuclear power plant operations

    Energy Technology Data Exchange (ETDEWEB)

    Throneburg, E. B.; Jones, J. M. [AREVA NP Inc., 7207 IBM Drive, Charlotte, NC 28262 (United States)

    2006-07-01

    Situation awareness and trust are two issues that need to be addressed in the design of computer-based procedures for nuclear power plants. Situation awareness, in relation to computer-based procedures, concerns the operators' knowledge of the plant's state while following the procedures. Trust concerns the amount of faith that the operators put into the automated procedures, which can affect situation awareness. This paper first discusses the advantages and disadvantages of computer-based procedures. It then discusses the known aspects of situation awareness and trust as applied to computer-based procedures in nuclear power plants. An outline of a proposed experiment is then presented that includes methods of measuring situation awareness and trust so that these aspects can be analyzed for further study. (authors)

  2. Design of test and emergency procedures to improve operator behaviour in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1982-09-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: - the elaboration of a procedure for action and of a separate educational procedure, - the coordination of crew responses, - the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  3. Design of test and emergency procedures to improve operator behavior in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1983-01-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: the elaboration of a procedure for action and of separate educational procedure; the coordination of crew responses; and the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  4. Situation awareness and trust in computer-based procedures in nuclear power plant operations

    International Nuclear Information System (INIS)

    Throneburg, E. B.; Jones, J. M.

    2006-01-01

    Situation awareness and trust are two issues that need to be addressed in the design of computer-based procedures for nuclear power plants. Situation awareness, in relation to computer-based procedures, concerns the operators' knowledge of the plant's state while following the procedures. Trust concerns the amount of faith that the operators put into the automated procedures, which can affect situation awareness. This paper first discusses the advantages and disadvantages of computer-based procedures. It then discusses the known aspects of situation awareness and trust as applied to computer-based procedures in nuclear power plants. An outline of a proposed experiment is then presented that includes methods of measuring situation awareness and trust so that these aspects can be analyzed for further study. (authors)

  5. The licensing procedure for construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Salvatore, J.E.L.

    1980-03-01

    The licensing procedure for the construction and operation of the nuclear power plants in Brazil is analysed, according to the International Atomic Energy Agency orientation. The risks related to the nuclear energy is also emphasized. (A.L.) [pt

  6. Safety procedures in operation of inspection and maintenance of pressure reduction and metering stations

    International Nuclear Information System (INIS)

    Villas Boas, Ademar Jose; Biesemeyer, Marco Aurelio R.

    2000-01-01

    Each local Natural Gas Distribution Company in Brazil has its own working procedures for operations of inspection and maintenance on equipment and accessories connected to the gas network. Some of these Companies developed a better elaborated and documented way of working routines, while others only work based on their operators experience. The objective of this work is to create a standard procedure for operations of inspection and maintenance of Pressure Reducing Stations and Metering Stations, mainly the ones concerned to safety aspects. This work has no intention of exhausting all aspects related to this subject but to become the first step to standardize these types of operations among Natural Gas Distribution Companies. (author)

  7. Oak Ridge National Laboratory whole-body counter: internal operating procedure manual

    International Nuclear Information System (INIS)

    Berger, C.D.; Lane, B.H.

    1982-08-01

    The general purpose of the ORNL Whole Body Counter is to provide a rapid estimation of the type and quantity of radionuclide deposited in the human body. This report contains a review of the equipment in use at the facility and the procedure for its operation, the standard procedure for performing a routine whole body count, and a discussion of interpretation of results

  8. Procedure for hazards analysis of plutonium gloveboxes used in analytical chemistry operations

    International Nuclear Information System (INIS)

    Delvin, W.L.

    1977-06-01

    A procedure is presented to identify and assess hazards associated with gloveboxes used for analytical chemistry operations involving plutonium. This procedure is based upon analytic tree methodology and it has been adapted from the US Energy Research and Development Administration's safety program, the Management Oversight and Risk Tree

  9. Guidelines for the preparation of emergency operating procedures. Resolution of comments on NUREG-0799

    International Nuclear Information System (INIS)

    1982-08-01

    The purpose of this document is to identify the elements necessary for utilities to prepare and implement a program of Emergency Operating Procedures (EOPs) for use by control room personnel to assist in mitigating the consequences of a broad range of accidents and multiple equipment failures. This document applies only to the EOPs so designated; it does not address emergency preparedness or emergency planning. It also represents the resolution of comments on NUREG-0799, Draft Criteria for Preparation of Emergency Operating Procedures

  10. Development and application of emergency operating procedures for nuclear power plants

    International Nuclear Information System (INIS)

    Lin Chengge

    1990-01-01

    The development and application of emergency operating procedures (EOPs) is an important measure to assure the operational safety for nuclear power plants. Event-oriented, symptom-, function- and state-oriented EOPs with their structures, interfaces, development procedures and practical application are described. The ideas and approach can be available for the preparation of EOPs for nuclear power plants which are going to be in service

  11. Operating manual for the High Flux Isotope Reactor: operating procedures, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-11-01

    Information is presented concerning the research facilities; cooling systems; contaiment heating, ventilating, and air conditioning; emergency procedures; waste systems; on-site utilites; records and data accumulation; auxiliary equipment; and technical specifications requirement.

  12. New Resolution Strategy for Multi-scale Reaction Waves using Time Operator Splitting and Space Adaptive Multiresolution: Application to Human Ischemic Stroke*

    Directory of Open Access Journals (Sweden)

    Louvet Violaine

    2011-12-01

    Full Text Available We tackle the numerical simulation of reaction-diffusion equations modeling multi-scale reaction waves. This type of problems induces peculiar difficulties and potentially large stiffness which stem from the broad spectrum of temporal scales in the nonlinear chemical source term as well as from the presence of large spatial gradients in the reactive fronts, spatially very localized. A new resolution strategy was recently introduced ? that combines a performing time operator splitting with high oder dedicated time integration methods and space adaptive multiresolution. Based on recent theoretical studies of numerical analysis, such a strategy leads to a splitting time step which is not restricted neither by the fastest scales in the source term nor by stability limits related to the diffusion problem, but only by the physics of the phenomenon. In this paper, the efficiency of the method is evaluated through 2D and 3D numerical simulations of a human ischemic stroke model, conducted on a simplified brain geometry, for which a simple parallelization strategy for shared memory architectures was implemented, in order to reduce computing costs related to “detailed chemistry” features of the model.

  13. Reactor operating procedures for start up of continuously operated chemical plants

    NARCIS (Netherlands)

    Verwijs, J.W.; Verwijs, J.W.; Kösters, P.H.; van den Berg, Henderikus; Westerterp, K.R.; Kosters, P.G.H.

    1995-01-01

    Rules are presented for the startup of an adiabatic tubular reactor, based on a qualitative analysis of the dynamic behavior of continuously-operated vapor- and liquid-phase processes. The relationships between the process dynamics, operating criteria, and operating constraints are investigated,

  14. Preliminary Investigation of Time Remaining Display on the Computer-based Emergency Operating Procedure

    Science.gov (United States)

    Suryono, T. J.; Gofuku, A.

    2018-02-01

    One of the important thing in the mitigation of accidents in nuclear power plant accidents is time management. The accidents should be resolved as soon as possible in order to prevent the core melting and the release of radioactive material to the environment. In this case, operators should follow the emergency operating procedure related with the accident, in step by step order and in allowable time. Nowadays, the advanced main control rooms are equipped with computer-based procedures (CBPs) which is make it easier for operators to do their tasks of monitoring and controlling the reactor. However, most of the CBPs do not include the time remaining display feature which informs operators of time available for them to execute procedure steps and warns them if the they reach the time limit. Furthermore, the feature will increase the awareness of operators about their current situation in the procedure. This paper investigates this issue. The simplified of emergency operating procedure (EOP) of steam generator tube rupture (SGTR) accident of PWR plant is applied. In addition, the sequence of actions on each step of the procedure is modelled using multilevel flow modelling (MFM) and influenced propagation rule. The prediction of action time on each step is acquired based on similar case accidents and the Support Vector Regression. The derived time will be processed and then displayed on a CBP user interface.

  15. Integration of emergency action levels with Combustion Engineering Emergency Operating Procedures

    International Nuclear Information System (INIS)

    Faletti, D.W.; Jamison, J.D.

    1985-09-01

    This report documents the development of a method for integrating Emergency Action Levels (EALs) with plant-specific Emergency Operating Procedures (EOPs) using the Combustion Engineering Owners' Group Emergency Operating Procedure Technical Guidelines (CEOG EOPTFs). EALs are discrete conditions or values of plant operating parameters which, if exceeded, require declaration of an appropriate level of emergency. At most operating plants, the EALs and event classification procedures are totally separate from the Emergency Operating Procedures used by the plant staff to control the plant during abnormal conditions. Control room personnel using the EOPs to deal with abnormal plant conditions must recognize when plant safety is sufficiently degraded that an emergency declaration may be warranted, and then enter a separate classification procedure containing EALs for a number of plant conditions and parameters. The operator then compares the existing plant conditions to the EALs and makes an emergency declaration accordingly. Using the Combustion Engineering Owners' Group Technical Guidelines document, a set of emergency class definitions and criteria were developed based on the status of the three main fission product barriers (fuel cladding, primary coolant system and containment). The EOPTGs were then annotated with suggested guidance to a procedure writer. The proposed method was tested by applying it to the reactor accident sequences that were shown in the reactor safety study to dominate accident risk. The object of the test was to determine if an EAL set linked to the EOP annotations would produce timely and accurate classification of the risk-dominant sequences. 6 refs., 13 figs., 31 tabs

  16. A cost and time analysis of laryngology procedures in the endoscopy suite versus the operating room.

    Science.gov (United States)

    Hillel, Alexander T; Ochsner, Matthew C; Johns, Michael M; Klein, Adam M

    2016-06-01

    To assess the costs, charges, reimbursement, and efficiency of performing awake laryngology procedures in an endoscopy suite (ES) compared with like procedures performed in the operating room (OR). Retrospective review of billing records. Cost, charges, and reimbursements for the hospital, surgeon, and anesthesiologist were compared between ES injection laryngoplasty and laser excision procedures and matched case controls in the OR. Time spent in 1) the preoperative unit, 2) the operating or endoscopy suite, and 3) recovery unit were compared between OR and ES procedures. Hospital expenses were significantly less for ES procedures when compared to OR procedures. Reimbursement was similar for ES and OR injection laryngoplasty, though greater for OR laser excisions. Net balance (reimbursement-expenses) was greater for ES procedures. A predictive model of payer costs over a 3-year period showed similar costs for ES and OR laser procedures and reduced costs for ES compared to OR injection laryngoplasty. Times spent preoperatively and the procedure were significantly less for ES procedures. For individual laryngology procedures, the ES reduces time and costs compared to the OR, increasing otolaryngologist and hospital efficiency. This reveals cost and time savings of ES injection laryngoplasty, which occurs at a similar frequency as OR injection laryngoplasty. Given the increased frequency for ES laser procedures, total costs are similar for ES and OR laser excision of papilloma, which usually require repeated procedures. When regulated office space is unavailable, endoscopy rooms represent an alternative setting for unsedated laryngology procedures. NA Laryngoscope, 126:1385-1389, 2016. © 2015 The American Laryngological, Rhinological and Otological Society, Inc.

  17. Development of automated operating procedure system using fuzzy colored petri nets for nuclear power plants

    International Nuclear Information System (INIS)

    Lee, Seung Jun; Seong, Poong Hyun

    2004-01-01

    In this work, AuTomated Operating Procedure System (ATOPS) is developed. ATOPS is an automation system for emergency operation of a nuclear power plant (NPP) and it can monitor signals, diagnose statuses, and generate control actions according to corresponding operating procedures without any human operator's help. Main functions of ATOPS are an anomaly detection function and a procedure execution function but only the procedure execution function is implemented in this work because this work is just the first step. In the procedure execution function, operating procedures of NPPs are analyzed and modeled using Fuzzy Colored Petri Nets (FCPN) and executed depending on decision making of the inference engine. In this work, ATOPS prototype is developed to demonstrate its feasibility and it is also validated using the FISA-2/WS simulator. The validation is performed for the cases of a loss of coolant accident (LOCA) and a steam generator tube rupture (SGTR). The simulation results show that ATOPS works correctly in the emergency situations

  18. Developments in the preparation of operating procedures for emergency conditions of nuclear power plants

    International Nuclear Information System (INIS)

    1985-06-01

    In recent years a substantial effort has been devoted by the nuclear community to extend Emergency Operating Procedures (EOPs) to cover all conceivable events and to develop procedure formats that transmit the essential guidance to operators in an optimum way. The information given in this report is based upon the most recent developments in formulating and applying EOPs. It should therefore provide guidance to those involved in preparing or reviewing EOPs on the scope, technical basis, organization and format of such procedures. It also outlines the actions required to validate the adequacy and applicability of these procedures so that the correct operator actions are achieved. Examples are given to illustrate the developments in some Member States

  19. Field Operations and Enforcement Manual for Air Pollution Control. Volume III: Inspection Procedures for Specific Industries.

    Science.gov (United States)

    Weisburd, Melvin I.

    The Field Operations and Enforcement Manual for Air Pollution Control, Volume III, explains in detail the following: inspection procedures for specific sources, kraft pulp mills, animal rendering, steel mill furnaces, coking operations, petroleum refineries, chemical plants, non-ferrous smelting and refining, foundries, cement plants, aluminum…

  20. Hanford tank waste operation simulator operational waste volume projection verification and validation procedure

    International Nuclear Information System (INIS)

    HARMSEN, R.W.

    1999-01-01

    The Hanford Tank Waste Operation Simulator is tested to determine if it can replace the FORTRAN-based Operational Waste Volume Projection computer simulation that has traditionally served to project double-shell tank utilization. Three Test Cases are used to compare the results of the two simulators; one incorporates the cleanup schedule of the Tri Party Agreement

  1. Automated Kick Control Procedure for an Influx in Managed Pressure Drilling Operations

    Directory of Open Access Journals (Sweden)

    Jing Zhou

    2016-01-01

    Full Text Available Within drilling of oil and gas wells, the Managed Pressure Drilling (MPD method with active control of wellbore pressure during drilling has partly evolved from conventional well control procedures. However, for MPD operations the instrumentation is typically more extensive compared to conventional drilling. Despite this, any influx of formation fluids (commonly known as a kick during MPD operations is typically handled by conventional well control methods, at least if the kick is estimated to be larger than a threshold value. Conventional well control procedures rely on manual control of the blow out preventer, pumps, and choke valves and do not capitalize on the benefits from the instrumentation level associated with MPD. This paper investigates two alternative well control procedures specially adapted to backpressure MPD: the dynamic shut-in (DSI procedure and the automatic kick control (AKC procedure. Both methods capitalize on improvements in Pressure While Drilling (PWD technology. A commercially available PWD tool buffers high-resolution pressure measurements, which can be used in an automated well control procedure. By using backpressure MPD, the choke valve opening is tuned automatically using a feedback-feedforward control method. The two procedures are evaluated using a high fidelity well flow model and cases from a North Sea drilling operation are simulated. The results show that using AKC procedure reduces the time needed to establish control of the well compared to DSI procedure. It also indicates that the AKC procedure reduces the total kick size compared to the DSI procedure, and thereby reduces the risk of lost circulation.

  2. Contribution of the ergonomic analysis to the improvement of the design of operating procedures in nuclear power plants

    International Nuclear Information System (INIS)

    Dien, Y.; Montmayeul, R.

    1992-11-01

    The design of operating procedures for continuous processes is much too often based on implicit assumptions both concerning the operators and the operating conditions that must be dealt with. The merit of the ergonomic approach to the design of procedures is to take account of the way the various operators actually use operating procedures. The actual use is determined from the analysis of on-site operation (normal and incident operating conditions) and the analysis of full-scale simulators tests (incident operating conditions). The introduction of the ergonomic approach in the procedure design results in new design principles being proposed

  3. Techniques for preparing flowchart-format emergency operating procedures: Background (Sections 1.0-9.0)

    International Nuclear Information System (INIS)

    Barnes, V.E.; Moore, C.J.; Wieringa, D.R.; Isakson, C.S.; Kono, B.K.; Gruel, R.L.

    1989-01-01

    This two-volume report describes the activities, findings, and recommendations of a project entitled ''Techniques for Presenting Flowchart-Format Emergency Operating Procedures.'' The project team surveyed the literature pertaining to flowcharts, reviewed existing flowchart emergency operating procedures (EOPs), interviewed consultants who produced flowcharts, and interviewed reactor operator licensing examiners about the use of flowcharts in nuclear power plants. This document, and Volume 1 of this report, discusses the use of flowchart-format EOPs in nuclear power plants and presents issue to be addressed in the design and implementation of flowchart EOPs. 66 refs., 76 figs., 2 tabs

  4. EVALUASI SANITATION STANDARD OPERATING PROCEDURES KERUPUKAMPLANG DI UD SARINA KECAMATAN KALIANGET KABUPATEN SUMENEP

    Directory of Open Access Journals (Sweden)

    Ach Triharjono

    2016-11-01

    Full Text Available Industri pangan untuk menghasilkan produk yang memenuhi standar keamanan pangan. Standar tersebut dapat dipenuhi dengan menerapkan 8 aspek kunci Sanitation Standard Operating Prosedures (SSOP. Tujuan dari penelitian ini adalah untuk memperoleh hasil penerapan 8 aspek kunci Sanitation Standard Operating Procedures (SSOP dan mengevaluasi penerapan Sanitation Standard Operating Procedures (SSOP Di UD Sarina Kecamatan Kalianget Kabupaten Sumenep. Jenis penelitian ini bersifat deskriptif dengan lokasi penelitian di UD Sarina Kecamatan Kalianget Kabupaten Sumenep. Hasil penelitian diketahui bahwa penerapan 8 aspek kunci Sanitation Standard Operating Procedures (SSOP di UD Sarina sudah terlaksana tapi terdapat 3 tahapan kunci yang belum terlaksana dengan baik yaitu pencegahan kontaminasi silang, pengawasan kondisi kesehatan personil dan menghilangkan hama dari unit pengolahan. Hal yang perlu ditingkatkan terkait dengan penerapan SSOP di UD Sarina yaitu masih perlu adanya manual prosedur untuk berbagai pelaksanaan sanitasi yang dilakukan oleh UD Sarina ini

  5. Automated operator procedure prompting for startup of Experimental Breeder Reactor-2

    Energy Technology Data Exchange (ETDEWEB)

    Renshaw, A.W.; Ball, S.J.; Ford, C.E.

    1990-11-01

    This report describes the development of an operator procedure prompting aid for startup of a nuclear reactor. This operator aid is a preliminary design for a similar aid that eventually will be used with the Advanced Liquid Metal Reactor (ALMR) presently in the design stage. Two approaches were used to develop this operator procedure prompting aid. One method uses an expert system software shell, and the other method uses database software. The preliminary requirements strongly pointed toward features traditionally associated with both database and expert systems software. Database software usually provides data manipulation flexibility and user interface tools, and expert systems tools offer sophisticated data representation and reasoning capabilities. Both methods, including software and associated hardware, are described in this report. Proposals for future enhancements to improve the expert system approach to procedure prompting and for developing other operator aids are also offered. 25 refs., 14 figs.

  6. Automated operator procedure prompting for startup of Experimental Breeder Reactor-2

    International Nuclear Information System (INIS)

    Renshaw, A.W.; Ball, S.J.; Ford, C.E.

    1990-11-01

    This report describes the development of an operator procedure prompting aid for startup of a nuclear reactor. This operator aid is a preliminary design for a similar aid that eventually will be used with the Advanced Liquid Metal Reactor (ALMR) presently in the design stage. Two approaches were used to develop this operator procedure prompting aid. One method uses an expert system software shell, and the other method uses database software. The preliminary requirements strongly pointed toward features traditionally associated with both database and expert systems software. Database software usually provides data manipulation flexibility and user interface tools, and expert systems tools offer sophisticated data representation and reasoning capabilities. Both methods, including software and associated hardware, are described in this report. Proposals for future enhancements to improve the expert system approach to procedure prompting and for developing other operator aids are also offered. 25 refs., 14 figs

  7. A study for Unsafe Act classification under crew interaction during procedure-driven operation

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Park, Jinkyun; Kim, Yochan; Kim, Seunghwan; Jung, Wondea

    2016-01-01

    Highlights: • The procedure driven operation was divided into four stages by considering the crew relations such as instructions and responses. • Ten patterns of UA occurrence paths and the related operators per path were identified. • The UA type classification scheme was proposed based on the ten patterns of UA occurrence paths. • A case study to implement the UA type classification and to define the related operators per UA was performed. • The UA type classification scheme can be practical in that it prevents bias by subjective judgment. - Abstract: In this study, a method for UA (Unsafe Act) classification under a simulated procedure driven operation was proposed. To this end, a procedure driven operation was divided into four stages by considering the crew relations such as instructions and responses. Based on the four stages of a procedure driven operation, ten patterns of UA occurrence paths and the related operators per path were identified. From the ten types of UA occurrence paths including related operators, it is practicable to trace when and by whom a UA is initiated during a procedure driven operation, and the interaction or causality among the crew after the UA is initiated. Therefore, the types of UAs were classified into ‘Instruction UA’, ‘Reporting UA’, and ‘Execution UA’ by considering the initiation time and initiator of UA. A case study to implement the UA type classification and to define the related operators per UA was performed with the ISLOCA scenario simulator training data. The UA classification scheme proposed in this paper can be practical in that it does not require expertise relatively in a human performance analysis and it prevents bias by subjective judgment because it is based on an observation-based approach to exclude subjective judgment.

  8. Time cycle calculation procedure for the special crew during the mining mobile machine complex operation

    International Nuclear Information System (INIS)

    Shmurygin, V; Lukyanov, V; Maslovsky, A

    2015-01-01

    The relevance of the research is specified by the necessity to optimize the delft mobile tunneling equipment operation. Target of the research is tunneling time cycle justification for the special crew during the mining mobile machine complex operation. Methods of the research included the consideration of operation organization schemes in the drifting face and effective use of the mobile equipment during mine exploratory working operations. Time cycle calculation procedures for major processes have been considered. This has been done for the special crew during the mobile machine complex operations for several working faces and various organization schemes

  9. A method for risk informing procedures at operating nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, P. F.; Martin del Campo, C., E-mail: pnelson_007@yahoo.com [UNAM, Facultad de Ingenieria, Departamento de Sistemas Energeticos, Paseo Cuauhnahuac No. 8532, Col. Progreso, 62550 Jiutepec, Morelos (Mexico)

    2012-10-15

    The technical approach presented establishes a framework intended to provide the necessary elements for a deployable human performance monitoring program that incorporates insights from plant specific probabilistic risk assessments, human reliability analysis, as well as the development of plant specific human failure data. A human performance monitoring program of this structure would be used to provide the ability to risk inform procedures (e.g., operations or maintenance) to determine the operational risk significance of procedural performance (i.e., precautions, prerequisites, procedure steps), the likelihood of consequential human error dur the performance of the procedure, and the identification of procedure specific barriers to reduce or eliminate consequential human errors. The program would provide the means to assess procedures prior to execution and the means to record and trend human failure events leading to a plant specific human failure database for human activities characterized as pre-initiator. The technical methods and data processing for each of these areas are developed and presented, as well as an example application of an operational procedure error leading to a plant level event (i.e, plant trip). (Author)

  10. Effective and efficient learning in the operating theater with intraoperative video-enhanced surgical procedure training.

    Science.gov (United States)

    van Det, M J; Meijerink, W J H J; Hoff, C; Middel, B; Pierie, J P E N

    2013-08-01

    INtraoperative Video Enhanced Surgical procedure Training (INVEST) is a new training method designed to improve the transition from basic skills training in a skills lab to procedural training in the operating theater. Traditionally, the master-apprentice model (MAM) is used for procedural training in the operating theater, but this model lacks uniformity and efficiency at the beginning of the learning curve. This study was designed to investigate the effectiveness and efficiency of INVEST compared to MAM. Ten surgical residents with no laparoscopic experience were recruited for a laparoscopic cholecystectomy training curriculum either by the MAM or with INVEST. After a uniform course in basic laparoscopic skills, each trainee performed six cholecystectomies that were digitally recorded. For 14 steps of the procedure, an observer who was blinded for the type of training determined whether the step was performed entirely by the trainee (2 points), partially by the trainee (1 point), or by the supervisor (0 points). Time measurements revealed the total procedure time and the amount of effective procedure time during which the trainee acted as the operating surgeon. Results were compared between both groups. Trainees in the INVEST group were awarded statistically significant more points (115.8 vs. 70.2; p < 0.001) and performed more steps without the interference of the supervisor (46.6 vs. 18.8; p < 0.001). Total procedure time was not lengthened by INVEST, and the part performed by trainees was significantly larger (69.9 vs. 54.1 %; p = 0.004). INVEST enhances effectiveness and training efficiency for procedural training inside the operating theater without compromising operating theater time efficiency.

  11. Improving the safety and quality of nursing care through standardized operating procedures in Bosnia and Herzegovina.

    Science.gov (United States)

    Ausserhofer, Dietmar; Rakic, Severin; Novo, Ahmed; Dropic, Emira; Fisekovic, Eldin; Sredic, Ana; Van Malderen, Greet

    2016-06-01

    We explored how selected 'positive deviant' healthcare facilities in Bosnia and Herzegovina approach the continuous development, adaptation, implementation, monitoring and evaluation of nursing-related standard operating procedures. Standardized nursing care is internationally recognized as a critical element of safe, high-quality health care; yet very little research has examined one of its key instruments: nursing-related standard operating procedures. Despite variability in Bosnia and Herzegovina's healthcare and nursing care quality, we assumed that some healthcare facilities would have developed effective strategies to elevate nursing quality and safety through the use of standard operating procedures. Guided by the 'positive deviance' approach, we used a multiple-case study design to examine a criterion sample of four facilities (two primary healthcare centres and two hospitals), collecting data via focus groups and individual interviews. In each studied facility, certification/accreditation processes were crucial to the initiation of continuous development, adaptation, implementation, monitoring and evaluation of nursing-related SOPs. In one hospital and one primary healthcare centre, nurses working in advanced roles (i.e. quality coordinators) were responsible for developing and implementing nursing-related standard operating procedures. Across the four studied institutions, we identified a consistent approach to standard operating procedures-related processes. The certification/accreditation process is enabling necessary changes in institutions' organizational cultures, empowering nurses to take on advanced roles in improving the safety and quality of nursing care. Standardizing nursing procedures is key to improve the safety and quality of nursing care. Nursing and Health Policy are needed in Bosnia and Herzegovina to establish a functioning institutional framework, including regulatory bodies, educational systems for developing nurses' capacities or the

  12. Knowing the operative game plan: a novel tool for the assessment of surgical procedural knowledge.

    Science.gov (United States)

    Balayla, Jacques; Bergman, Simon; Ghitulescu, Gabriela; Feldman, Liane S; Fraser, Shannon A

    2012-08-01

    What is the source of inadequate performance in the operating room? Is it a lack of technical skills, poor judgment or a lack of procedural knowledge? We created a surgical procedural knowledge (SPK) assessment tool and evaluated its use. We interviewed medical students, residents and training program staff on SPK assessment tools developed for 3 different common general surgery procedures: inguinal hernia repair with mesh in men, laparoscopic cholecystectomy and right hemicolectomy. The tools were developed as a step-wise assessment of specific surgical procedures based on techniques described in a current surgical text. We compared novice (medical student to postgraduate year [PGY]-2) and expert group (PGY-3 to program staff) scores using the Mann-Whitney U test. We calculated the total SPK score and defined a cut-off score using receiver operating characteristic analysis. In all, 5 participants in 7 different training groups (n = 35) underwent an interview. Median scores for each procedure and overall SPK scores increased with experience. The median SPK for novices was 54.9 (95% confidence interval [CI] 21.6-58.8) compared with 98.05 (95% CP 94.1-100.0) for experts (p = 0.012). The SPK cut-off score of 93.1 discriminates between novice and expert surgeons. Surgical procedural knowledge can reliably be assessed using our SPK assessment tool. It can discriminate between novice and expert surgeons for common general surgical procedures. Future studies are planned to evaluate its use for more complex procedures.

  13. Risk of Venous Thromboembolism and Operative Duration in Patients Undergoing Neurosurgical Procedures.

    Science.gov (United States)

    Bekelis, Kimon; Labropoulos, Nicos; Coy, Shannon

    2017-05-01

    The association of operative duration with the risk of venous thromboembolism (VTE) has not been quantified in neurosurgery. To investigate the association of surgical duration for several neurosurgical procedures and the incidence of VTE. We performed a retrospective cohort study involving patients who underwent neurosurgical procedures from 2005 to 2012 and were registered in the American College of Surgeons National Quality Improvement Project registry. In order to control for confounding, we used multivariable regression models, and propensity score conditioning. During the study period, there were 94 747 patients, who underwent neurosurgical procedures, and met the inclusion criteria. Of these, 1358 (1.0%) developed VTE within 30 days postoperatively. Multivariable logistic regression demonstrated an association of longer operative duration with higher 30-day incidence of VTE (odds ratio [OR], 1.22; 95% confidence interval [CI], 1.19-1.25). Compared with procedures of moderate duration (third quintile, 40-60th percentile), patients undergoing the longest procedures (>80th percentile) had higher odds (OR, 3.15; 95% CI, 2.49-3.99) of developing VTE. The shortest procedures (<20th percentile) were associated with a decreased incidence of VTE (OR, 0.51; 95% CI, 0.27-0.76) in comparison to those of moderate duration. The same associations were present in propensity score-adjusted models, and models stratified by subgroups of cranial, spinal, peripheral nerve, and carotid procedures. In a cohort of patients from a national prospective surgical registry, increased operative duration was associated with increased incidence of VTE for neurosurgical procedures. These results can be used by neurosurgeons to inform operative management, and to stratify patients with regard to VTE risk. Copyright © 2016 by the Congress of Neurological Surgeons

  14. How to develop a Standard Operating Procedure for sorting unfixed cells

    Science.gov (United States)

    Schmid, Ingrid

    2012-01-01

    Written Standard Operating Procedures (SOPs) are an important tool to assure that recurring tasks in a laboratory are performed in a consistent manner. When the procedure covered in the SOP involves a high-risk activity such as sorting unfixed cells using a jet-in-air sorter, safety elements are critical components of the document. The details on sort sample handling, sorter set-up, validation, operation, troubleshooting, and maintenance, personal protective equipment (PPE), and operator training, outlined in the SOP are to be based on careful risk assessment of the procedure. This review provides background information on the hazards associated with sorting of unfixed cells and the process used to arrive at the appropriate combination of facility design, instrument placement, safety equipment, and practices to be followed. PMID:22381383

  15. How to develop a standard operating procedure for sorting unfixed cells.

    Science.gov (United States)

    Schmid, Ingrid

    2012-07-01

    Written standard operating procedures (SOPs) are an important tool to assure that recurring tasks in a laboratory are performed in a consistent manner. When the procedure covered in the SOP involves a high-risk activity such as sorting unfixed cells using a jet-in-air sorter, safety elements are critical components of the document. The details on sort sample handling, sorter set-up, validation, operation, troubleshooting, and maintenance, personal protective equipment (PPE), and operator training, outlined in the SOP are to be based on careful risk assessment of the procedure. This review provides background information on the hazards associated with sorting of unfixed cells and the process used to arrive at the appropriate combination of facility design, instrument placement, safety equipment, and practices to be followed. Copyright © 2012 Elsevier Inc. All rights reserved.

  16. Towards Verification of Operational Procedures Using Auto-Generated Diagnostic Trees

    Science.gov (United States)

    Kurtoglu, Tolga; Lutz, Robyn; Patterson-Hine, Ann

    2009-01-01

    The design, development, and operation of complex space, lunar and planetary exploration systems require the development of general procedures that describe a detailed set of instructions capturing how mission tasks are performed. For both crewed and uncrewed NASA systems, mission safety and the accomplishment of the scientific mission objectives are highly dependent on the correctness of procedures. In this paper, we describe how to use the auto-generated diagnostic trees from existing diagnostic models to improve the verification of standard operating procedures. Specifically, we introduce a systematic method, namely the Diagnostic Tree for Verification (DTV), developed with the goal of leveraging the information contained within auto-generated diagnostic trees in order to check the correctness of procedures, to streamline the procedures in terms of reducing the number of steps or use of resources in them, and to propose alternative procedural steps adaptive to changing operational conditions. The application of the DTV method to a spacecraft electrical power system shows the feasibility of the approach and its range of capabilities

  17. Estimating the operator's performance time of emergency procedural tasks based on a task complexity measure

    International Nuclear Information System (INIS)

    Jung, Won Dae; Park, Jink Yun

    2012-01-01

    It is important to understand the amount of time required to execute an emergency procedural task in a high-stress situation for managing human performance under emergencies in a nuclear power plant. However, the time to execute an emergency procedural task is highly dependent upon expert judgment due to the lack of actual data. This paper proposes an analytical method to estimate the operator's performance time (OPT) of a procedural task, which is based on a measure of the task complexity (TACOM). The proposed method for estimating an OPT is an equation that uses the TACOM as a variable, and the OPT of a procedural task can be calculated if its relevant TACOM score is available. The validity of the proposed equation is demonstrated by comparing the estimated OPTs with the observed OPTs for emergency procedural tasks in a steam generator tube rupture scenario.

  18. A cadaveric procedural anatomy simulation course improves video-based assessment of operative performance.

    Science.gov (United States)

    Sharma, Gaurav; Aycart, Mario A; O'Mara, Lynne; Havens, Joaquim; Nehs, Matthew; Shimizu, Naomi; Smink, Douglas S; Gravereaux, Edwin; Gates, Jonathan D; Askari, Reza

    2018-03-01

    Inadequate anatomic knowledge has been cited as a major contributor to declining surgical resident operative competence. We analyzed the impact of a comprehensive, procedurally oriented cadaveric procedural anatomy dissection laboratory on the operative performance of surgery residents, hypothesizing that trainees' performance of surgical procedures would improve after such a dissection course. Midlevel general surgery residents (n = 9) participated in an 8 wk, 16-h surgery faculty-led procedurally oriented cadaver simulation course. Both before and after completion of the course, residents participated in a practical examination, in which they were randomized to perform one of nine Surgical Council on Resident Education-designated "essential" procedures. The procedures were recorded using wearable video technology. Videos were deidentified before evaluation by six faculty raters blinded to examinee and whether performances occurred before or after an examinee had taken the course. Raters used the validated Operative Performance Rating System and Objective Structured Assessment of Technical Skill scales. After the course residents had higher procedure-specific scores (median, 4.0 versus 2.4, P 4.0 versus 3.0, P = 0.006), respect for tissue (4.0 versus 3.0, P = 0.0004), time and motion (3.0 versus 2.0, P = 0.0007), operation flow (3.0 versus 2.0, P = 0.0005), procedural knowledge (4.0 versus 2.0, P = 0.0001), and overall performance scores (4.0 versus 2.0, P < 0.0001). Operative Performance Rating System and Objective Structured Assessment of Technical Skill scales averaged by number of items in each were also higher (3.2 versus 2.0, P = 0.0002 and 3.1 versus 2.2, P = 0.002, respectively). A cadaveric procedural anatomy simulation course covering a broad range of open general surgery procedures was associated with significant improvements in trainees' operative performance. Copyright © 2017 Elsevier Inc. All rights reserved.

  19. Development of automated generation system of accidental operating procedures for a PWR

    International Nuclear Information System (INIS)

    Artaud, J.L.

    1991-06-01

    The aim of the ACACIA project is to develop an automated generation system of accident operating procedures for a PWR. This research and development study, common at CEA and EDF, has two objectives: at mean-dated the realization of a validation tool and a procedure generation; at long-dated the dynamic generation of real time procedures. This work is consecrated at the realization of 2 prototypes. These prototypes and the technics used are described in detail. The last chapter explores the perspectives given by this type of tool [fr

  20. Upgrade of the Department of Energy's Savannah River Site's reactor operations and maintenance procedures

    International Nuclear Information System (INIS)

    Walsh, T.E.

    1991-01-01

    This paper describes the program in progress at the Savannah River Site (SRS) to upgrade the existing reactor operating and maintenance procedures to current commercial nuclear industry standards. In order to meet this goal, the following elements were established: administrative procedures to govern the upgrade process, tracking system to provide status and accountability; and procedure writing guides. The goal is to establish a benchmark of excellence by which other Department of Energy (DOE) sites will measure themselves. The above three elements are addressed in detail in this paper

  1. GRUKON - A package of applied computer programs system input and operating procedures of functional modules

    International Nuclear Information System (INIS)

    Sinitsa, V.V.; Rineiskij, A.A.

    1993-04-01

    This manual describes a software package for the production of multigroup neutron cross-sections from evaluated nuclear data files. It presents the information necessary for the implementation of the program's modules in the framework of the execution of the program, including: operating procedures of the program, the data input, the macrocommand language, the assignment of the system's procedures. This report also presents the methodology used in the coding of the individual modules: the rules, the syntax, the method of procedures. The report also presents an example of the application of the data processing module. (author)

  2. Improving the review of standard operating procedures: a novel electronic system for compounding pharmacies.

    Science.gov (United States)

    Brensel, Robert; Brensel, Scott; Ng, Amy

    2013-01-01

    Since the New England Compounding Center disaster in 2012, the importance of following correct procedures during every phase of customized pharmacy has been a focus of governmental interest and action as well as public scrutiny. Many pharmacies rely on the rote review of standard operating procedures to ensure that staff members understand and follow protocols that ensure the safety and potency of all compounds prepared, but that approach to continuing education can be cumbersome and needlessly time-consuming. In addition, documenting and retrieving evidence of employee competence can be difficult. In this article, we describe our use of online technology to improve our methods of educating staff about the full range of standard operating procedures that must be followed in our pharmacy. The system we devised and implemented has proven to be effective, easy to update and maintain, very inexpensive, and user friendly. Its use has reduced the time previously required for a read-over review of standard operating procedures from 30 or 40 minutes to 5 or 10 minutes in weekly staff meetings, and we can now easily document and access proof of employees' comprehension of that content. It is our hope that other small compounding pharmacies will also find this system of online standard operating procedure review helpful.

  3. Rules and procedures for the design and operation of hazardous research equipment

    International Nuclear Information System (INIS)

    1978-12-01

    The manual has been prepared for use by research personnel involved in experiments at the Lawrence Berkeley Laboratory. It contains rules and procedures for the design, test, installation, and operation of hazardous research equipment. Sect. I contains such information as responsibility of experimenters for safety, descriptions of the various Laboratory safety organizations, and enumeration of various services available to experimenters at the Laboratory. Sect. II describes specific rules for the setup and operation of experimental equipment at the Laboratory. Sect. III gives detailed design criteria and procedures for equipment frequently encountered in the high energy physics laboratory

  4. Operational circular No. 9 – Principles and procedures governing complaints of harassment

    CERN Multimedia

    HR Department

    2011-01-01

    Operational Circular No. 9 entitled "Principles and Procedures Governing Complaints of Harassment", approved by the Director-General following discussion in the Standing Concertation Committee meeting on 21 March 2011, is available on the intranet site of the Human Resources Department: https://cern.ch/hr-docs/opcirc/opcirc.asp Operational Circular No. 9 is applicable to any person working at or on behalf of CERN. It cancels and replaces Administrative Circular No. 32 entitled "Principles and Procedures Governing Complaints of Harassment” of February 2000. Department Head Office

  5. An expert system-based aid for analysis of Emergency Operating Procedures in NPPs

    International Nuclear Information System (INIS)

    Jakubowski, Z.; Beraha, D.

    1996-01-01

    Emergency Operating Procedures (EOPs) generally and an accident management (AM) particularly play a significant part in the safety philosophy on NPPs since many years. A better methodology for development and validation of EOPs is desired. A prototype of an Emergency Operating Procedures Analysis System (EOPAS), which has been developed at GRS, is presented in the paper. The hardware configuration and software organisation of the system is briefly reviewed. The main components of the system such as the knowledge base of an expert system and the engineering simulator are described. (author)

  6. The study on development of emergency operating procedures based on symptom and risk for accident management

    International Nuclear Information System (INIS)

    Kang, K. S.; Jeong, H. J.

    1998-01-01

    The Advanced EOP(AEOP) has been developed by focusing on the importance of the operators role in emergency conditions. In the AEOP, to overcome the complexity of current EOPs and maintain the consistency of operators action according to plant emergency conditions, operator's task were allocated according to their duties. As an alternative, the Computerized Operator Aid System (COAS) has been developed to reduce operator's burden and provide detailed instructions of procedure. Probabilistic Safety Assessment (PSA) results were synthesized in the AEOP using the event tree to give the awareness and the prediction of accident progression in advance. In conclusion, the existing EOP with its inherent complexity should be simplified and consolidated using computerized operator support system and task allocation to prevent more severe accidents and to reduce operator cognitive overload in emergency conditions

  7. The study on development of emergency operating procedures based on symptom and risk for accident management

    Energy Technology Data Exchange (ETDEWEB)

    Kang, K. S.; Jeong, H. J. [KOPEC, Taejon (Korea, Republic of)

    1998-10-01

    The Advanced EOP(AEOP) has been developed by focusing on the importance of the operators role in emergency conditions. In the AEOP, to overcome the complexity of current EOPs and maintain the consistency of operators action according to plant emergency conditions, operator's task were allocated according to their duties. As an alternative, the Computerized Operator Aid System (COAS) has been developed to reduce operator's burden and provide detailed instructions of procedure. Probabilistic Safety Assessment (PSA) results were synthesized in the AEOP using the event tree to give the awareness and the prediction of accident progression in advance. In conclusion, the existing EOP with its inherent complexity should be simplified and consolidated using computerized operator support system and task allocation to prevent more severe accidents and to reduce operator cognitive overload in emergency conditions.

  8. Prediction of post-operative pain after a laparoscopic tubal ligation procedure

    DEFF Research Database (Denmark)

    Rudin, A.; Wolner-Hanssen, P.; Hellbom, M.

    2008-01-01

    ligation procedure. METHODS: Assessments of anxiety, mood, psychological vulnerability and pre-operative pain were made before surgery using the State-Trait Anxiety Inventory (STAI), the Hospital Anxiety Depression Scale (HADS), a psychological vulnerability test and the Short-Form McGill Pain......BACKGROUND: Pre-operative identification of reliable predictors of post-operative pain may lead to improved pain management strategies. We investigated the correlation between pre-operative pain, psychometric variables, response to heat stimuli and post-operative pain following a laparoscopic tubal...... Questionnaire (SF-MPQ), respectively. Pre-operative assessments of thermal thresholds and pain response to randomized series of heat stimuli (1 s, 44-48 degrees C) were made with quantitative sensory testing technique. Post-operative pain intensity was evaluated daily by a visual analogue scale during rest...

  9. A hybridized discontinuous Galerkin framework for high-order particle-mesh operator splitting of the incompressible Navier-Stokes equations

    Science.gov (United States)

    Maljaars, Jakob M.; Labeur, Robert Jan; Möller, Matthias

    2018-04-01

    A generic particle-mesh method using a hybridized discontinuous Galerkin (HDG) framework is presented and validated for the solution of the incompressible Navier-Stokes equations. Building upon particle-in-cell concepts, the method is formulated in terms of an operator splitting technique in which Lagrangian particles are used to discretize an advection operator, and an Eulerian mesh-based HDG method is employed for the constitutive modeling to account for the inter-particle interactions. Key to the method is the variational framework provided by the HDG method. This allows to formulate the projections between the Lagrangian particle space and the Eulerian finite element space in terms of local (i.e. cellwise) ℓ2-projections efficiently. Furthermore, exploiting the HDG framework for solving the constitutive equations results in velocity fields which excellently approach the incompressibility constraint in a local sense. By advecting the particles through these velocity fields, the particle distribution remains uniform over time, obviating the need for additional quality control. The presented methodology allows for a straightforward extension to arbitrary-order spatial accuracy on general meshes. A range of numerical examples shows that optimal convergence rates are obtained in space and, given the particular time stepping strategy, second-order accuracy is obtained in time. The model capabilities are further demonstrated by presenting results for the flow over a backward facing step and for the flow around a cylinder.

  10. Operative vaginal delivery and invasive procedures in pregnancy among women living with HIV.

    Science.gov (United States)

    Peters, Helen; Francis, Kate; Harding, Kate; Tookey, Pat A; Thorne, Claire

    2017-03-01

    To describe the use and outcomes of operative delivery and invasive procedures in pregnancy amongst women living with HIV. The National Study of HIV in Pregnancy and Childhood (NSHPC) is a comprehensive population-based surveillance study in the UK and Ireland. The NSHPC has collected data on operative delivery since 2008, and invasive procedures in pregnancy (amniocentesis, cordocentesis, chorionic villus sampling) from 2012. Descriptive analyses were conducted on 278 pregnancies expected to deliver from 1 January 2008 with outcome reported to the NSHPC by 31 March 2016. Among 9372 pregnancies in 2008-2016, there were 9072 livebirths with 251 operative deliveries and 27 invasive procedures in pregnancy reported. Information was available for 3023/3490 vaginal deliveries, and use of forceps or vacuum reported in 251deliveries (8.2%), increasing over calendar time to almost 10% by 2014-16. Forceps were used twice as often as vacuum delivery, and forceps use increased over time. One infant delivered operatively is known to have acquired HIV. From 2012 there were 4063 pregnancies resulting in 3952 livebirths, 83 terminations and 28 stillbirths. 2163/4063 had information on use (or not) of invasive procedures in pregnancy. Amniocentesis was reported in 25/2163 pregnancies, there was one report of chorionic villus sampling and one of cordocentesis. There were no reported transmissions following invasive procedures in pregnancy. This is the largest study to date to report on operative delivery in women living with HIV on combined antiretroviral therapy (cART), and provides an up-to-date picture of invasive procedures during pregnancy in this group. Findings from this comprehensive national study are reassuring but numbers are currently low; on-going monitoring is crucial as obstetric care of women with HIV becomes normalised. Copyright © 2017 Elsevier B.V. All rights reserved.

  11. Towards large volume big divisor D3/D7 " μ-split supersymmetry" and Ricci-flat Swiss-cheese metrics, and dimension-six neutrino mass operators

    Science.gov (United States)

    Dhuria, Mansi; Misra, Aalok

    2012-02-01

    We show that it is possible to realize a " μ-split SUSY" scenario (Cheng and Cheng, 2005) [1] in the context of large volume limit of type IIB compactifications on Swiss-cheese Calabi-Yau orientifolds in the presence of a mobile space-time filling D3-brane and a (stack of) D7-brane(s) wrapping the "big" divisor. For this, we investigate the possibility of getting one Higgs to be light while other to be heavy in addition to a heavy higgsino mass parameter. Further, we examine the existence of long lived gluino that manifests one of the major consequences of μ-split SUSY scenario, by computing its decay width as well as lifetime corresponding to the three-body decays of the gluino into either a quark, a squark and a neutralino or a quark, squark and goldstino, as well as two-body decays of the gluino into either a neutralino and a gluon or a goldstino and a gluon. Guided by the geometric Kähler potential for Σ obtained in Misra and Shukla (2010) [2] based on GLSM techniques, and the Donaldson's algorithm (Barun et al., 2008) [3] for obtaining numerically a Ricci-flat metric, we give details of our calculation in Misra and Shukla (2011) [4] pertaining to our proposed metric for the full Swiss-cheese Calabi-Yau (the geometric Kähler potential being needed to be included in the full moduli space Kähler potential in the presence of the mobile space-time filling D3-brane), but for simplicity of calculation, close to the big divisor, which is Ricci-flat in the large volume limit. Also, as an application of the one-loop RG flow solution for the higgsino mass parameter, we show that the contribution to the neutrino masses at the EW scale from dimension-six operators arising from the Kähler potential, is suppressed relative to the Weinberg-type dimension-five operators.

  12. The BWR [Boiling Water Reactor] Emergency Operating Procedures Tracking System (EOPTS): Evaluation by control-room operating crews

    International Nuclear Information System (INIS)

    Spurgin, A.J.; Orvis, D.D.; Spurgin, J.P.; Luna, C.J.

    1990-05-01

    This report presents the results of a project sponsored by the Electric Power Research Institute (EPRI) and Taiwan Power Company (TPC) and conducted by APG and TPC to perform evaluation of the Emergency Operating Procedures Tracking System (EOPTS). The EOPTS is an expert system employing artificial intelligence techniques developed by EPRI for Boiling Water Reactor (BWR) plants based on emergency operating procedures (EOPs). EOPTS is a computerized decision aid used to assist plant operators in efficient and reliable use of EOPs. The main objective of this project was to evaluate the EOPTS and determine how an operator aid of this type could noticeably improve the response time and the reliability of control room crews to multi-failure scenarios. A secondary objective was to collect data on how crew performance was affected. Experiments results indicate that the EOPTS measurably improves crew performance over crews using the EOP flow charts. Time-comparison measurements indicate that crews using the EOPTS perform required actions more quickly than do those using the flowcharts. The results indicate that crews using the EOPTS are not only faster and more consistent in their actions but make fewer errors. In addition, they have a higher likelihood of recovering from the errors that they do make. Use of the EOPTS in the control room should result in faster termination and mitigation of accidents and reduced risk of power plant operations. Recommendations are made towards possible applications of the EOPTS to operator training and evaluation, and for the applicability of the evaluation methodology developed for this project to the evaluation of similar operator aides. 17 refs., 14 figs., 14 tabs

  13. Surveillance of Environmental and Procedural Measures of Infection Control in the Operating Theatre Setting

    Directory of Open Access Journals (Sweden)

    Laura Dallolio

    2017-12-01

    Full Text Available The microbiological contamination of operating theatres and the lack of adherence to best practices by surgical staff represent some of the factors affecting Surgical Site Infections (SSIs. The aim of the present study was to assess the microbiological quality of operating settings and the staff compliance to the SSI evidence-based control measures. Ten operating rooms were examined for microbiological contamination of air and surfaces, after cleaning procedures, in “at rest” conditions. Furthermore, 10 surgical operations were monitored to assess staff compliance to the recommended practices. None of the air samples exceeded microbiological reference standards and only six of the 200 surface samples (3.0% were slightly above recommended levels. Potentially pathogenic bacteria and moulds were never detected. Staff compliance to best practices varied depending on the type of behaviour investigated and the role of the operator. The major not compliant behaviours were: pre-operative skin antisepsis, crowding of the operating room and hand hygiene of the anaesthetist. The good environmental microbiological quality observed is indicative of the efficacy of the cleaning-sanitization procedures adopted. The major critical point was staff compliance to recommended practices. Awareness campaigns are therefore necessary, aimed at improving the organisation of work so as to facilitate compliance to operative protocols.

  14. 40 CFR 63.1104 - Process vents from continuous unit operations: applicability assessment procedures and methods.

    Science.gov (United States)

    2010-07-01

    ...) Necessitating that the owner or operator make product in excess of demand. (e) TOC or Organic HAP concentration....306×10 −2 a Use according to procedures outlined in this section. MJ/scm = Mega Joules per standard cubic meter. scm/min = Standard cubic meters per minute. (2) Nonhalogenated process vents. The owner or...

  15. Standard operating procedures for female orgasmic disorder: consensus of the International Society for Sexual Medicine

    NARCIS (Netherlands)

    Laan, Ellen; Rellini, Alessandra H.; Barnes, Tricia

    2013-01-01

    As the field of sexual medicine evolves, it is important to continually improve patient care by developing contemporary "standard operating procedures" (SOPs), reflecting the consensus view of experts in sexual medicine. Few, if any, consensus SOPs have been developed for the diagnosis and treatment

  16. A review of procedures available to seismically requalify operating nuclear plant structures, equipment and distribution systems

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1985-01-01

    It is well known that the loads and procedures used to seismically qualify nuclear power plant structures and components have changed dramatically during the past 15 to 20 years. In this paper, the various methods available to seismically qualify or requalify structures and components in operating nuclear power plants are identified and the advantages and disadvantages of each briefly summarized. (orig.)

  17. Procedures for using expert judgment to estimate human-error probabilities in nuclear power plant operations

    International Nuclear Information System (INIS)

    Seaver, D.A.; Stillwell, W.G.

    1983-03-01

    This report describes and evaluates several procedures for using expert judgment to estimate human-error probabilities (HEPs) in nuclear power plant operations. These HEPs are currently needed for several purposes, particularly for probabilistic risk assessments. Data do not exist for estimating these HEPs, so expert judgment can provide these estimates in a timely manner. Five judgmental procedures are described here: paired comparisons, ranking and rating, direct numerical estimation, indirect numerical estimation and multiattribute utility measurement. These procedures are evaluated in terms of several criteria: quality of judgments, difficulty of data collection, empirical support, acceptability, theoretical justification, and data processing. Situational constraints such as the number of experts available, the number of HEPs to be estimated, the time available, the location of the experts, and the resources available are discussed in regard to their implications for selecting a procedure for use

  18. Standard operating procedures improve acute neurologic care in a sub-Saharan African setting.

    Science.gov (United States)

    Jaiteh, Lamin E S; Helwig, Stefan A; Jagne, Abubacarr; Ragoschke-Schumm, Andreas; Sarr, Catherine; Walter, Silke; Lesmeister, Martin; Manitz, Matthias; Blaß, Sebastian; Weis, Sarah; Schlund, Verena; Bah, Neneh; Kauffmann, Jil; Fousse, Mathias; Kangankan, Sabina; Ramos Cabrera, Asmell; Kronfeld, Kai; Ruckes, Christian; Liu, Yang; Nyan, Ousman; Fassbender, Klaus

    2017-07-11

    Quality of neurologic emergency management in an under-resourced country may be improved by standard operating procedures (SOPs). Neurologic SOPs were implemented in a large urban (Banjul) and a small rural (Brikama) hospital in the Gambia. As quality indicators of neurologic emergency management, performance of key procedures was assessed at baseline and in the first and second implementation years. At Banjul, 100 patients of the first-year intervention group exhibited higher rates of general procedures of emergency management than 105 control patients, such as neurologic examination (99.0% vs 91.4%; p process quality of neurologic emergency management in under-resourced settings. This study provides Class IV evidence that, for patients with suspected neurologic emergencies in sub-Saharan Africa, neurologic SOPs increase the rate of performance of guideline-recommended procedures. Copyright © 2017 The Author(s). Published by Wolters Kluwer Health, Inc. on behalf of the American Academy of Neurology.

  19. NRC/FEMA operational response procedures for response to a commercial nuclear reactor accident

    International Nuclear Information System (INIS)

    1983-11-01

    Procedures have been developed by the US Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) which provide the response teams of both agencies with the steps to be taken in responding to an emergency at a commercial nuclear power plant. The emphasis of these procedures is mainly on the interface between NRC and FEMA at their respective Headquarters and Regional Offices and at the various sites at which such an emergency could occur. Detailed procedures are presented that cover for both agencies, notification schemes and manner of activation, organizations at Headquaters and the site, interface procedures, coordination of onsite and offsite operations, the role of the Senior FEMA Official, and the cooperative efforts of each agency's public information staff

  20. NRC/FEMA operational response procedures for response to a commercial nuclear reactor accident. Revision 1

    International Nuclear Information System (INIS)

    1985-02-01

    Procedures have been developed by the US Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) which provide the response teams of both agencies with the steps to be taken in responding to an emergency at a commercial nuclear power plant. The emphasis of these procedures is mainly on the interface between NRC and FEMA at their respective Headquarters and Regional Offices and at the various sites at which such an emergency could occur. Detailed procedures are presented that cover for both agencies, notification schemes and manner of activation, organizations at Headquarters and the site, interface procedures, coordination of onsite and offsite operations, the role of the Senior FEMA Official, and the cooperative efforts of each agency's public information staff

  1. Bootstrap-based procedures for inference in nonparametric receiver-operating characteristic curve regression analysis.

    Science.gov (United States)

    Rodríguez-Álvarez, María Xosé; Roca-Pardiñas, Javier; Cadarso-Suárez, Carmen; Tahoces, Pablo G

    2018-03-01

    Prior to using a diagnostic test in a routine clinical setting, the rigorous evaluation of its diagnostic accuracy is essential. The receiver-operating characteristic curve is the measure of accuracy most widely used for continuous diagnostic tests. However, the possible impact of extra information about the patient (or even the environment) on diagnostic accuracy also needs to be assessed. In this paper, we focus on an estimator for the covariate-specific receiver-operating characteristic curve based on direct regression modelling and nonparametric smoothing techniques. This approach defines the class of generalised additive models for the receiver-operating characteristic curve. The main aim of the paper is to offer new inferential procedures for testing the effect of covariates on the conditional receiver-operating characteristic curve within the above-mentioned class. Specifically, two different bootstrap-based tests are suggested to check (a) the possible effect of continuous covariates on the receiver-operating characteristic curve and (b) the presence of factor-by-curve interaction terms. The validity of the proposed bootstrap-based procedures is supported by simulations. To facilitate the application of these new procedures in practice, an R-package, known as npROCRegression, is provided and briefly described. Finally, data derived from a computer-aided diagnostic system for the automatic detection of tumour masses in breast cancer is analysed.

  2. N3S project of fluid mechanics. High order in time methods by operator splitting. Application to Navier-Stokes equations

    International Nuclear Information System (INIS)

    Boukir, K.

    1994-06-01

    This thesis deals with the extension to higher order in time of two splitting methods for the Navier-Stokes equations: the characteristics method and the projection one. The first consists in decoupling the convection operator from the Stokes one. The second decomposes this latter into a diffusion problem and a pressure-continuity one. Concerning the characteristics method, numerical and theoretical study is developed for the second order scheme together with a finite element spatial discretization. The case of a spectral spatial discretization is also treated and theoretical analysis are given respectively for second and third order schemes. For both spatial discretizations, we obtain good error estimates, unconditionally or under non stringent stability conditions, for both velocity and pressure. Numerical results illustrate the interest of the second order scheme comparing to the first order one. Extensions of the second order scheme to the K-epsilon turbulence model are proposed and tested, in the case of a finite element spatial discretization. Concerning the projection method, we define the order schemes. The theoretical study deals with stability and convergence of first and second order projection schemes, for the incompressible Navier-Stokes equations and with a finite element spatial discretization. The numerical study concerns mainly the second order scheme applied to the Navier-Stokes equations with varying density. (authors). 63 refs., figs

  3. Clinical Comparison of At-Home and In-Office Dental Bleaching Procedures: A Randomized Trial of a Split-Mouth Design.

    Science.gov (United States)

    Machado, Lucas Silveira; Anchieta, Rodolfo Bruniera; dos Santos, Paulo Henrique; Briso, André Luiz; Tovar, Nick; Janal, Malvin N; Coelho, Paulo Guilherme; Sundfeld, Renato Herman

    2016-01-01

    The objective of this split-mouth clinical study was to compare a combination of in-office and at-home dental bleaching with at-home bleaching alone. Two applications of in-office bleaching were performed, with one appointment per week, using 38% hydrogen peroxide. At-home bleaching was performed with or without in-office bleaching using 10% carbamide peroxide in a custom-made tray every night for 2 weeks. The factor studied was the bleaching technique on two levels: Technique 1 (in-office bleaching combined with home bleaching) and Technique 2 (home bleaching only). The response variables were color change, dental sensitivity, morphology, and surface roughness. The maxillary right and left hemiarches of the participants were submitted to in-office placebo treatment and in-office bleaching, respectively (Phase 1), and at-home bleaching (Phase 2) treatment was performed on both hemiarches, characterizing a split-mouth design. Enamel surface changes and roughness were analyzed with scanning electron microscopy and optical interferometry using epoxy replicas. No statistically significant differences were observed between the bleaching techniques for either the visual or the digital analyses. There was a significant difference in dental sensitivity when both dental bleaching techniques were used, with in-office bleaching producing the highest levels of dental sensitivity after the baseline. Microscopic analysis of the morphology and roughness of the enamel surface showed no significant changes between the bleaching techniques. The two techniques produced similar results in color change, and the combination technique produced the highest levels of sensitivity. Neither technique promoted changes in morphology or surface roughness of enamel.

  4. Comparison of the effect of paper and computerized procedures on operator error rate and speed of performance

    International Nuclear Information System (INIS)

    Converse, S.A.; Perez, P.B.; Meyer, S.; Crabtree, W.

    1994-01-01

    The Computerized Procedures Manual (COPMA-II) is an advanced procedure manual that can be used to select and execute procedures, to monitor the state of plant parameters, and to help operators track their progress through plant procedures. COPMA-II was evaluated in a study that compared the speed and accuracy of operators' performance when they performed with COPMA-II and traditional paper procedures. Sixteen licensed reactor operators worked in teams of two to operate the Scales Pressurized Water Reactor Facility at North Carolina State University. Each team performed one change of power with each type of procedure to simulate performance under normal operating conditions. Teams then performed one accident scenario with COPMA-II and one with paper procedures. Error rates, performance times, and subjective estimates of workload were collected, and were evaluated for each combination of procedure type and scenario type. For the change of power task, accuracy and response time were not different for COPMA-II and paper procedures. Operators did initiate responses to both accident scenarios fastest with paper procedures. However, procedure type did not moderate response completion time for either accident scenario. For accuracy, performance with paper procedures resulted in twice as many errors as did performance with COPMA-II. Subjective measures of mental workload for the accident scenarios were not affected by procedure type

  5. [Handling modern imaging procedures in a high-tech operating room].

    Science.gov (United States)

    Hüfner, T; Citak, M; Imrecke, J; Krettek, C; Stübig, T

    2012-03-01

    Operating rooms are the central unit in the hospital network in trauma centers. In this area, high costs but also high revenues are generated. Modern operating theater concepts as an integrated model have been offered by different companies since the early 2000s. Our hypothesis is that integrative concepts for operating rooms, in addition to improved operating room ergonomics, have the potential for measurable time and cost savings. In our clinic, an integrated operating room concept (I-Suite, Stryker, Duisburg) was implemented after analysis of the problems. In addition to the ceiling-mounted arrangement, the system includes an endoscopy unit, a navigation system, and a voice control system. In the first 6 months (9/2005 to 2/2006), 112 procedures were performed in the integrated operating room: 34 total knee arthroplasties, 12 endoscopic spine surgeries, and 66 inpatient arthroscopic procedures (28 shoulder and 38 knee reconstructions). The analysis showed a daily saving of 22-45 min, corresponding to 15-30% of the daily changeover times, calculated to account for potential savings in the internal cost allocation of 225-450 EUR. A commercial operating room concept was evaluated in a pilot phase in terms of hard data, including time and cost factors. Besides the described effects further savings might be achieved through the effective use of voice control and the benefit of the sterile handle on the navigation camera, since waiting times for an additional nurse are minimized. The time of the procedure of intraoperative imaging is also reduced due to the ceiling-mounted concept, as the C-arm can be moved freely in the operating theater without hindering cables. By these measures and ensuing improved efficiency, the initial high costs for the implementation of the system may be cushioned over time.

  6. A study on development of the step complexity measure for emergency operating procedures using entropy concepts

    International Nuclear Information System (INIS)

    Park, J. K.; Jung, W. D.; Kim, J. W.; Ha, J. J.

    2001-04-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human errors play a major role in many accidents. For example, it was reported that about 70% of aviation accidents are due to human errors, and that approximately 28% of accidents in process industries are caused by human errors. According to related studies, written manuals or operating procedures are revealed as one of the most important factors in aviation and manufacturing industries. In case of NPPs, the importance of procedures is more salient than other industries because not only over 50% of human errors were due to procedures but also about 18% of accidents were caused by the failure of following procedures. Thus, the provision of emergency operating procedures (EOPs) that are designed so that the possibility of human errors can be reduced is very important. To accomplish this goal, a quantitative and objective measure that can evaluate EOPs is indispensable. The purpose of this study is the development of a method that can quantify the complexity of a step included in EOPs. In this regard, the step complexity measure (SC) is developed based on three sub-measures such as the SIC (step information complexity), the SLC (step logic complexity) and the SSC (step size complexity). To verify the SC measure, not only quantitative validations (such as comparing SC scores with subjective evaluation results and with averaged step performance time) but also qualitative validations to clarify physical meanings of the SC measure are performed

  7. A study on development of the step complexity measure for emergency operating procedures using entropy concepts

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. K.; Jung, W. D.; Kim, J. W.; Ha, J. J

    2001-04-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human errors play a major role in many accidents. For example, it was reported that about 70% of aviation accidents are due to human errors, and that approximately 28% of accidents in process industries are caused by human errors. According to related studies, written manuals or operating procedures are revealed as one of the most important factors in aviation and manufacturing industries. In case of NPPs, the importance of procedures is more salient than other industries because not only over 50% of human errors were due to procedures but also about 18% of accidents were caused by the failure of following procedures. Thus, the provision of emergency operating procedures (EOPs) that are designed so that the possibility of human errors can be reduced is very important. To accomplish this goal, a quantitative and objective measure that can evaluate EOPs is indispensable. The purpose of this study is the development of a method that can quantify the complexity of a step included in EOPs. In this regard, the step complexity measure (SC) is developed based on three sub-measures such as the SIC (step information complexity), the SLC (step logic complexity) and the SSC (step size complexity). To verify the SC measure, not only quantitative validations (such as comparing SC scores with subjective evaluation results and with averaged step performance time) but also qualitative validations to clarify physical meanings of the SC measure are performed.

  8. Simultaneous bilateral stereotactic procedure for deep brain stimulation implants: a significant step for reducing operation time.

    Science.gov (United States)

    Fonoff, Erich Talamoni; Azevedo, Angelo; Angelos, Jairo Silva Dos; Martinez, Raquel Chacon Ruiz; Navarro, Jessie; Reis, Paul Rodrigo; Sepulveda, Miguel Ernesto San Martin; Cury, Rubens Gisbert; Ghilardi, Maria Gabriela Dos Santos; Teixeira, Manoel Jacobsen; Lopez, William Omar Contreras

    2016-07-01

    OBJECT Currently, bilateral procedures involve 2 sequential implants in each of the hemispheres. The present report demonstrates the feasibility of simultaneous bilateral procedures during the implantation of deep brain stimulation (DBS) leads. METHODS Fifty-seven patients with movement disorders underwent bilateral DBS implantation in the same study period. The authors compared the time required for the surgical implantation of deep brain electrodes in 2 randomly assigned groups. One group of 28 patients underwent traditional sequential electrode implantation, and the other 29 patients underwent simultaneous bilateral implantation. Clinical outcomes of the patients with Parkinson's disease (PD) who had undergone DBS implantation of the subthalamic nucleus using either of the 2 techniques were compared. RESULTS Overall, a reduction of 38.51% in total operating time for the simultaneous bilateral group (136.4 ± 20.93 minutes) as compared with that for the traditional consecutive approach (220.3 ± 27.58 minutes) was observed. Regarding clinical outcomes in the PD patients who underwent subthalamic nucleus DBS implantation, comparing the preoperative off-medication condition with the off-medication/on-stimulation condition 1 year after the surgery in both procedure groups, there was a mean 47.8% ± 9.5% improvement in the Unified Parkinson's Disease Rating Scale Part III (UPDRS-III) score in the simultaneous group, while the sequential group experienced 47.5% ± 15.8% improvement (p = 0.96). Moreover, a marked reduction in the levodopa-equivalent dose from preoperatively to postoperatively was similar in these 2 groups. The simultaneous bilateral procedure presented major advantages over the traditional sequential approach, with a shorter total operating time. CONCLUSIONS A simultaneous stereotactic approach significantly reduces the operation time in bilateral DBS procedures, resulting in decreased microrecording time, contributing to the optimization of functional

  9. Accuracy of axial depth of cut in micromilling operations - Simplified procedure and uncertainty model

    DEFF Research Database (Denmark)

    Bissacco, Giuliano

    2005-01-01

    , due to the easy breakage particularly when milling on hard materials [1]. Typical values for the errors on the control of the axial depth of cut are in the order of 50 microns, while the aimed depth of cut can be as low as 5 microns. The author has developed a machining procedure for optimal control...... of this investigation is the determination of the uncertainty of the set depth of cut, using the developed procedure, in a range of practical operating conditions and thereby the estimation of the expected accuracy of the method prior to verification of the machined parts....

  10. The use of flow models for design of plant operating procedures

    International Nuclear Information System (INIS)

    Lind, M.

    1982-03-01

    The report describe a systematic approach to the design of operating procedures or sequence automatics for process plant control. It is shown how flow models representing the topology of mass and energy flows on different levels of function provide plant information which is important for the considered design problem. The modelling methodology leads to the definition of three categories of control tasks. Two tasks relate to the regulation and control of changes of levels and flows of mass and energy in a system within a defined mode of operation. The third type relate to the control actions necessary for switching operations involved in changes of operating mode. These control tasks are identified for a given plant as part of the flow modelling activity. It is discussed how the flow model deal with the problem of assigning control task precedence in time eg. during start-up or shut-down operations. The method may be a basis for providing automated procedure support to the operator in unforeseen situations or may be a tool for control design. (auth.)

  11. Operability test procedure for 241-U compressed air system and heat pump

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1994-01-01

    The 241-U-701 compressed air system supplies instrument quality compressed air to Tank Farm 241-U. The supply piping to the 241-U Tank Farm is not included in the modification. Modifications to the 241-U-701 compressed air system include installation of a 15 HP Reciprocating Air Compressor, Ingersoll-Rand Model 10T3NLM-E15; an air dryer, Hankinson, Model DH-45; and miscellaneous system equipment and piping (valves, filters, etc.) to meet the design. A newly installed heat pump allows the compressor to operate within an enclosed relatively dust free atmosphere and keeps the compressor room within a standard acceptable temperature range, which makes possible efficient compressor operation, reduces maintenance, and maximizes compressor operating life. This document is an Operability Test Procedure (OTP) which will further verify (in addition to the Acceptance Test Procedure) that the 241-U-701 compressed air system and heat pump operate within their intended design parameters. The activities defined in this OTP will be performed to ensure the performance of the new compressed air system will be adequate, reliable and efficient. Completion of this OTP and sign off of the OTP Acceptance of Test Results is necessary for turnover of the compressed air system from Engineering to Operations

  12. Cold and compression in the management of musculoskeletal injuries and orthopedic operative procedures: a narrative review

    Directory of Open Access Journals (Sweden)

    Jon E Block

    2010-07-01

    Full Text Available Jon E BlockJon E Block, PhD., Incorporated, San Francisco, CA, USAAbstract: Cold and compression are routinely applied immediately after acute injury or ­following surgery to alleviate pain, reduce swelling and speed functional recovery. The objective of this literature review is to describe the published clinical findings regarding combined cold and compression therapy in the management of musculoskeletal injuries and after orthopedic operative procedures. Of 33 potential articles triaged, the findings of 21 randomized controlled trials were assessed and summarized. The findings reported by these 21 studies were largely subjective pain outcomes and, to a lesser degree, swelling and range of motion, and were inconsistent and divergent, making it difficult to recommend the most appropriate, effective clinical application of cold and compression. Further, 18 of the 21 reported studies evaluated cold and static compression, where the extent and duration of the compression was not uniform within or across studies. Operative procedures may offer a more controlled environment for rigorous investigations. However, such studies must be powered sufficiently to account for variations in surgical procedure that could affect outcomes. More uniform operative procedures, such as total knee arthroplasty, represent a well circumscribed intervention for studying the clinical utility of cold compression therapy because the operative technique is standardized, surgical tissue damage is extensive, intraoperative blood loss is high, and post-operative edema and pain are severe. Findings from randomized controlled trials of knee arthroplasty generally showed cold compression therapy provides better outcomes such as pain relief than alternative interventions. While the effects of cold and static compression are clearly better than no treatment, they do not appear to be directly additive.Keywords: cryotherapy, injury

  13. TVT-Exact and midurethral sling (SLING-IUFT) operative procedures: a randomized study.

    Science.gov (United States)

    Aniuliene, Rosita; Aniulis, Povilas; Skaudickas, Darijus

    2015-01-01

    The aim of the study is to compare results, effectiveness and complications of TVT exact and midurethral sling (SLING-IUFT) operations in the treatment of female stress urinary incontinence (SUI). A single center nonblind, randomized study of women with SUI who were randomized to TVT-Exact and SLING-IUFT was performed by one surgeon from April 2009 to April 2011. SUI was diagnosed on coughing and Valsalva test and urodynamics (cystometry and uroflowmetry) were assessed before operation and 1 year after surgery. This was a prospective randomized study. The follow up period was 12 months. 76 patients were operated using the TVT-Exact operation and 78 patients - using the SLING-IUFT operation. There was no statistically significant differences between groups for BMI, parity, menopausal status and prolapsed stage (no patients had cystocele greater than stage II). Mean operative time was significantly shorter in the SLING-IUFT group (19 ± 5.6 min.) compared with the TVT-Exact group (27 ± 7.1 min.). There were statistically significant differences in the effectiveness of both procedures: TVT-Exact - at 94.5% and SLING-IUFT - at 61.2% after one year. Hospital stay was statistically significantly shorter in the SLING-IUFT group (1. 2 ± 0.5 days) compared with the TVT-Exact group (3.5 ± 1.5 days). Statistically significantly fewer complications occurred in the SLING-IUFT group. the TVT-Exact and SLING-IUFT operations are both effective for surgical treatment of female stress urinary incontinence. The SLING-IUFT involved a shorter operation time and lower complications rate., the TVT-Exact procedure had statistically significantly more complications than the SLING-IUFT operation, but a higher effectiveness.

  14. Split ring containment attachment device

    International Nuclear Information System (INIS)

    Sammel, A.G.

    1996-01-01

    A containment attachment device is described for operatively connecting a glovebag to plastic sheeting covering hazardous material. The device includes an inner split ring member connected on one end to a middle ring member wherein the free end of the split ring member is inserted through a slit in the plastic sheeting to captively engage a generally circular portion of the plastic sheeting. A collar potion having an outer ring portion is provided with fastening means for securing the device together wherein the glovebag is operatively connected to the collar portion. 5 figs

  15. Safety evaluation by living probabilistic safety assessment. Procedures and applications for planning of operational activities and analysis of operating experience

    International Nuclear Information System (INIS)

    Johanson, Gunnar; Holmberg, J.

    1994-01-01

    Living Probabilistic Safety Assessment (PSA) is a daily safety management system and it is based on a plant-specific PSA and supporting information systems. In the living use of PSA, plant status knowledge is used to represent actual plant safety status in monitoring or follow-up perspective. The PSA model must be able to express the risk at a given time and plant configuration. The process, to update the PSA model to represent the current or planned configuration and to use the model to evaluate and direct the changes in the configuration, is called living PSA programme. The main purposes to develop and increase the usefulness of living PSA are: Long term safety planning: To continue the risk assessment process started with the basic PSA by extending and improving the basic models and data to provide a general risk evaluation tool for analyzing the safety effects of changes in plant design and procedures. Risk planning of operational activities: To support the operational management by providing means for searching optimal operational maintenance and testing strategies from the safety point of view. The results provide support for risk decision making in the short term or in a planning mode. The operational limits and conditions given by technical specifications can be analyzed by evaluating the risk effects of alternative requirements in order to balance the requirements with respect to operational flexibility and plant economy. Risk analysis of operating experience: To provide a general risk evaluation tool for analyzing the safety effects of incidents and plant status changes. The analyses are used to: identify possible high risk situations, rank the occurred events from safety point of view, and get feedback from operational events for the identification of risk contributors. This report describes the methods, models and applications required to continue the process towards a living use of PSA. 19 tabs, 20 figs

  16. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    Energy Technology Data Exchange (ETDEWEB)

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  17. Impact of procedure on the post-operative infection risk of patients after elective colon surgery.

    Science.gov (United States)

    Blitzer, David N; Davis, John M; Ahmed, Nasim; Kuo, Yen-Hong; Kuo, Yen-Liang

    2014-12-01

    Post-operative infection impacts the quality of patient care, prolongs the length of hospital stay, and utilizes more health care resources. The purpose of this study was to compare the rates of surgical site infection among three major surgical procedures for treating patients with colon pathology. The location of colon resection impacts the post-operative infection rate. A retrospective cohort study was conducted by using the 2006 Nationwide Inpatient Sample. Adult patients (age ≥18 yr) with colon diseases are the population of interest. The disease status and procedures were categorized according to the International Classification of Diseases, Ninth Revision, Clinical Modification (ICD-9-CM). Patients with a primary diagnosis of diverticulosis of the colon without hemorrhage (ICD-9-CM codes: 562.11 and 562.12) or malignant neoplasm of the colon (ICD-9-CM codes: 153.x, where x represents the possible digits within this ICD-9-CM code category), with procedures of open and other right hemicolectomy (ORH; ICD-9-CM code: 45.73) or open and other left hemicolectomy (OLH; ICD-9-CM code: 45.75), or open and other sigmoidectomy (OS; ICD-9-CM code: 45.76) were included for this study. The primary measured outcome for the study was surgical site infection. There were an estimated 26,381 ORH procedures, 9,558 OLH procedures, and 31,656 OS procedures performed in 2006. There was a significant difference among procedures with respect to their age distributions (mean [standard error]: ORH vs. OLH vs. OS=70.5 [0.2] vs. 63.8 [0.3] vs. 59.5 [0.2] yr, pinfection rates: ORH vs. OLH vs. OS=2.9% vs. 5.6% vs. 4.9%, pinfection for OLH (AOR [95% CI]: 1.31 [1.04-1.64], p=0.02) compared with OS. Different sites of colon operations were associated with different risks of surgical site infections. Accordingly, appropriate pre-operative measures should address these differences.

  18. Evaluating North Carolina Food Pantry Food Safety-Related Operating Procedures.

    Science.gov (United States)

    Chaifetz, Ashley; Chapman, Benjamin

    2015-11-01

    Almost one in seven American households were food insecure in 2012, experiencing difficulty in providing enough food for all family members due to a lack of resources. Food pantries assist a food-insecure population through emergency food provision, but there is a paucity of information on the food safety-related operating procedures used in the pantries. Food pantries operate in a variable regulatory landscape; in some jurisdictions, they are treated equivalent to restaurants, while in others, they operate outside of inspection regimes. By using a mixed methods approach to catalog the standard operating procedures related to food in 105 food pantries from 12 North Carolina counties, we evaluated their potential impact on food safety. Data collected through interviews with pantry managers were supplemented with observed food safety practices scored against a modified version of the North Carolina Food Establishment Inspection Report. Pantries partnered with organized food bank networks were compared with those that operated independently. In this exploratory research, additional comparisons were examined for pantries in metropolitan areas versus nonmetropolitan areas and pantries with managers who had received food safety training versus managers who had not. The results provide a snapshot of how North Carolina food pantries operate and document risk mitigation strategies for foodborne illness for the vulnerable populations they serve. Data analysis reveals gaps in food safety knowledge and practice, indicating that pantries would benefit from more effective food safety training, especially focusing on formalizing risk management strategies. In addition, new tools, procedures, or policy interventions might improve information actualization by food pantry personnel.

  19. Emergency operating procedures guidelines for pressurized water reactors - a progress report

    International Nuclear Information System (INIS)

    Lyon, W.C.

    1984-01-01

    Emergency Operating Procedures (EOPs) contain the instructions the operator will follow to control a nuclear plant whenever a condition exists that potentially jeopardizes the fuel cladding, the reactor coolant system (RCS) pressure boundary, or the containment. The EOPs are prepared from guidelines which contain the major operator instructions that will be in the EOPs. Guidelines have been prepared by owners' groups having Babcock and Wilcox (BandW), Combustion Engineering (CE), General Electric (GE), and Westinghouse (W) plants. These guidelines cover many aspects of full power operation. Future effort is anticipated to complete coverage of transient events, including severe accidents, all power conditions, and shutdown. This paper describes the philosophy which has guided NRC technical review of guidelines, progress achieved in providing comprehensive coverage of emergency conditions for PWRs, and anticipated future technical activities

  20. The importance of production standard operating procedure in a family business company

    Science.gov (United States)

    Hongdiyanto, C.

    2017-12-01

    Plastic industry is a growing sector, therefore UD X which engage in this business has a great potential to grow as well. The problem faced by this family business company is that no standard operating procedure is used and it lead to problem in the quality and quantity produced. This research is aim to create a production standard operating procedure for UD X. Semistructure interview is used to gather information from respondent to help writer create the SOP. There are four SOP’s created, namely: classifying SOP, sorting SOP, milling SOP and packing SOP. Having SOP will improve the effectiveness of production because employees already know how to work in each stages of production process.

  1. Rancang Bangun Document Management System Untuk Mengelola Dokumen Standart Operational Procedure

    Directory of Open Access Journals (Sweden)

    I Putu Susila Handika

    2017-09-01

    Standard Operational Procedure (SOP is one important document in a company because it is useful to improve the quality of the company. PT. Global Retailindo Pratama is one of the companies engaged in retail that using standard of quality management ISO 9001: 2008. Currently the management of SOP documents at PT. Global Retailindo Pratama still use manual way. Manual way cause some problems such as the search process and document distribution process takes quite a long time. This research aims to design and build Document Management System to manage SOP documents. The system development model used in this research is prototyping model. This application is built in web-based with PHP as programming language. Testing the application using Blak Box Testing and Usability Testing shows that the Document Management System can run in accordance with the needs and can be used easily so that the process of document management SOP becomes faster. Keywords: Document Management System, Standart Operational Procedure, Information System, PHP.

  2. Integrated Hatchery Operations Team: Policies and Procedures for Columbia Basin Anadromous Salmonid Hatcheries, 1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Integrated Hatchery Operations Team (Northwest Power Planning Council, Portland, OR)

    1995-01-01

    This document outlines regional policies and procedures for hatchery operations in the Columbia River Basin. The purpose of these policies is to provide regional guidelines by which all anadromous fish hatcheries will be operated. These policies will be adopted by the fisheries co-managers, and will provide guidance to operate hatcheries in an efficient and biologically sound manner. The hatchery policies presented in this manual are not intended to establish production priorities. Rather, the intent is to guide hatchery operations once production numbers are established. Hatchery operations discussed in this report include broodstock collection, spawning, incubation of eggs, fish rearing and feeding, fish release, equipment maintenance and operations, and personnel training. Decisions regarding production priorities must be provided by fishery managers through a comprehensive plan that addresses both natural and hatchery fish production. The Integrated Hatchery Operations Team is a multi-agency group called for by the Northwest Power Planning Council. This team was directed to develop new basinwide policies for managing and operating all existing and future anadromous fish hatcheries in the Columbia River Basin. The parties pledge to confer with each other and to use their authorities and resources to accomplish these mutually acceptable hatchery practices.

  3. Chapter 8. Medical procedures. Recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza epidemic or mass disaster

    NARCIS (Netherlands)

    Zimmerman, Janice L.; Sprung, Charles L.; Christian, Michael D.; Camargo, Ruben; Ceraso, Daniel; Azoulay, Elie; Duguet, Alexandre; Guery, Benoit; Reinhart, Konrad; Adini, Bruria; Barlavie, Yaron; Benin-Goren, Odeda; Cohen, Robert; Klein, Motti; Leoniv, Yuval; Margalit, Gila; Rubinovitch, Bina; Sonnenblick, Moshe; Steinberg, Avraham; Weissman, Charles; Wolff, Donna; Kesecioglu, Jozef; de Jong, Menno; Moreno, Rui; An, Youzhong; Du, Bin; Joynt, Gavin M.; Colvin, John; Loo, Shi; Richards, Guy; Artigas, Antonio; Pugin, Jerome; Amundson, Dennis; Devereaux, Asha; Beigel, John; Danis, Marion; Farmer, Chris; Hick, John L.; Maki, Dennis; Masur, Henry; Rubinson, Lewis; Sandrock, Christian; Talmor, Daniel; Truog, Robert; Zimmerman, Janice; Brett, Steve; Montgomery, Hugh; Rhodes, Andrew; Sanderson, Frances; Taylor, Bruce

    2010-01-01

    To provide recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza pandemic or mass disaster with a specific focus on ensuring that adequate resources are available and appropriate protocols are developed to safely perform procedures in

  4. Data management tools and operational procedures in ATLAS : Example of the German cloud

    International Nuclear Information System (INIS)

    Serfon, Cedric

    2010-01-01

    A set of tools have been developed to ensure the Data Management operations (deletion, consistency checks) within the German cloud for ATLAS. These tools are described hereafter and presented in the context of the operational procedures of the German cloud. A particular emphasis is put on the consistency checks between the different catalogs (LFC, DQ2 Central Catalogs) and the files stored on the Storage Element. These consistency checks are crucial to be sure that all the data stored in the sites are actually available for the users and to get rid of non registered files also known as Dark Data.

  5. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    International Nuclear Information System (INIS)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options

  6. An independent safety assessment of Department of Energy nuclear reactor facilities: Procedures, operations and maintenance

    International Nuclear Information System (INIS)

    Toto, G.; Lindgren, A.J.

    1981-02-01

    The 1979 accident at the Three Mile Island commercial nuclear power plant has led to a number of studies of nuclear reactors, in both the public and private sectors. One of these is that of the Department of Energy's (DOE) Nuclear Facilities Personnel Qualification and Training (NFPQT) Committee, which has outlined tasks for assessment of 13 reactors owned by DOE and operated by contractors. This report covers one of the tasks, the assessment of procedures, operations, and maintenance at the DOE reactor facilities, based on a review of actual documents used at the reactor sites

  7. Measurement of spatial dose distribution for evaluation operator dose during nero-interventional procedures

    International Nuclear Information System (INIS)

    Han, Su Chul; Hong, Dong Hee

    2016-01-01

    The spatial dose distribution was measured with ionization chamber as preliminary study to evaluate operator dose and to study dose reduction during neuro-interventional procedures. The zone of operators was divided into four area (45, 135, 225, and 315 degree).We supposed that operator exist on the four area and indicated location of critical organs(eyes, breast, gonad). The spatial doses were measured depending on distance( 80, 100, 120, and 140 cm) and location of critical organs. The spatial doses of area of 225 degree were 114.5 mR/h (eyes location), 143.1 mR/h (breast location) and 147 mR/h (gonad location) in 80 cm. When changed location of x-ray generator, spatial dose increased in 18.1±10.5%, averagely. We certified spatial dose in the operator locations, Using the results of this study, It is feasible to protect operator from radiation in neuro-interventional procedures

  8. Measurement of spatial dose distribution for evaluation operator dose during nero-interventional procedures

    Energy Technology Data Exchange (ETDEWEB)

    Han, Su Chul [Division of Medical Radiation Equipment, Korea Institute of Radiological and Medical Sciences, Seoul (Korea, Republic of); Hong, Dong Hee [Dept. of Radiology Science, Far East University, Eumseong (Korea, Republic of)

    2016-09-15

    The spatial dose distribution was measured with ionization chamber as preliminary study to evaluate operator dose and to study dose reduction during neuro-interventional procedures. The zone of operators was divided into four area (45, 135, 225, and 315 degree).We supposed that operator exist on the four area and indicated location of critical organs(eyes, breast, gonad). The spatial doses were measured depending on distance( 80, 100, 120, and 140 cm) and location of critical organs. The spatial doses of area of 225 degree were 114.5 mR/h (eyes location), 143.1 mR/h (breast location) and 147 mR/h (gonad location) in 80 cm. When changed location of x-ray generator, spatial dose increased in 18.1±10.5%, averagely. We certified spatial dose in the operator locations, Using the results of this study, It is feasible to protect operator from radiation in neuro-interventional procedures.

  9. Assisting emergency operating procedures execution with AMAS, an Accident Management Advisor System

    International Nuclear Information System (INIS)

    Guarro, S.; Milici, T.; Wu, J.S.; Apostolakis, G.

    2004-01-01

    In an accident situation, because any decisions that the operators make will depend on how instrumentation readings are ultimately interpreted, the issue of instrument uncertainty is of paramount importance. This uncertainty exists because instrument readings may not be available in the desired form - i.e., only indirect readings for a parameter of interest may exist, with uncertainty on which physical models may be used to deduce its value from these indirect indications -, or because readings may be coming from instruments whose accuracy and reliability in the face of the severe conditions produced by the accident are far from what may be expected under normal operating conditions. In following the EOPs, the operators must rely on instrumentation whose readings may not reflect the real situation. The Accident Management Advisor System (AMAS) is a decision aid intended to supplement plant Emergency Operating Procedures (EOPs) by accounting for instrumentation uncertainty, and by alerting the operators if they are on the wrong procedures, or otherwise performing an action that is not optimal in terms of preventing core damage. In AMAS, the availability and reliability of certain important instrument readings is treated in probabilistic, rather than deterministic terms. This issue is discussed in greater detail later in the paper, since it relates to one of the key characteristics of the AMAS decision aid. (author)

  10. A note on the implementation of variational procedures involving Green's operators

    Energy Technology Data Exchange (ETDEWEB)

    Blakemore, M; Evans, G A; Hyslop, J

    1975-12-01

    The numerical implementation of a minimum energy principle for atoms and molecules involving integral operators is discussed. It is demonstrated that the use of unscaled trial functions may be as convenient computationally as the earlier procedures involving scaled trial functions and that the revised prescription has advantages, mainly in ease of interpretation and comparison of results. By way of illustration, some earlier calculations on the hydrogen ion are reconsidered and compared. (auth)

  11. Mental workload measurement for emergency operating procedures in digital nuclear power plants.

    Science.gov (United States)

    Gao, Qin; Wang, Yang; Song, Fei; Li, Zhizhong; Dong, Xiaolu

    2013-01-01

    Mental workload is a major consideration for the design of emergency operation procedures (EOPs) in nuclear power plants. Continuous and objective measures are desired. This paper compares seven mental workload measurement methods (pupil size, blink rate, blink duration, heart rate variability, parasympathetic/sympathetic ratio, total power and (Goals, Operations, Methods, and Section Rules)-(Keystroke Level Model) GOMS-KLM-based workload index) with regard to sensitivity, validity and intrusiveness. Eighteen participants performed two computerised EOPs of different complexity levels, and mental workload measures were collected during the experiment. The results show that the blink rate is sensitive to both the difference in the overall task complexity and changes in peak complexity within EOPs, that the error rate is sensitive to the level of arousal and correlate to the step error rate and that blink duration increases over the task period in both low and high complexity EOPs. Cardiac measures were able to distinguish tasks with different overall complexity. The intrusiveness of the physiological instruments is acceptable. Finally, the six physiological measures were integrated using group method of data handling to predict perceived overall mental workload. The study compared seven measures for evaluating the mental workload with emergency operation procedure in nuclear power plants. An experiment with simulated procedures was carried out, and the results show that eye response measures are useful for assessing temporal changes of workload whereas cardiac measures are useful for evaluating the overall workload.

  12. Relation between task complexity and variability of procedure progression during an emergency operation

    International Nuclear Information System (INIS)

    Kim, Yochan; Park, Jinkyun; Jung, Wondea

    2013-01-01

    Highlights: • The relation between task complexity and the variability of procedure progression was investigated. • The two quantitative measures, TACOM and VPP, were applied to this study. • The task complexity was positively related with the operator’s procedural variability. • The VPP measure can be useful for explaining the operator’s behaviors. - Abstract: In this study, the relation between task complexity and variability of procedure progression during an emergency operation was investigated by comparing the two quantitative measures. To this end, the TACOM measure and VPP measure were applied to evaluate the complexity of tasks and variability of procedure progression, respectively. The TACOM scores and VPP scores were obtained for 60 tasks in the OPERA database, and a correlation analysis between two measures and a multiple regression analysis between the sub-measures of the TACOM measure and VPP measure were conducted. The results showed that the TACOM measure is positively associated with the VPP measure, and the abstraction hierarchy complexity mainly affected the variability among the sub-measures of TACOM. From these findings, it was discussed that the task complexity is related to an operator’s procedural variability and VPP measure can be useful for explaining the operator’s behaviors

  13. Aortic root operations for Marfan syndrome: a comparison of the Bentall and valve-sparing procedures.

    Science.gov (United States)

    Patel, Nishant D; Weiss, Eric S; Alejo, Diane E; Nwakanma, Lois U; Williams, Jason A; Dietz, Harry C; Spevak, Philip J; Gott, Vincent L; Vricella, Luca A; Cameron, Duke E

    2008-06-01

    We compared results of the Bentall procedure with valve-sparing aortic root replacement (VSRR) for aortic root aneurysm in Marfan syndrome. Marfan syndrome patients who had the Bentall procedure or VSRR at our institution between April 1997 and September 2006 were identified. Follow-up information was obtained from hospital charts and contact with patients or their physicians. Kaplan-Meier survival and propensity score analyses were performed. One hundred forty Marfan syndrome patients had either the Bentall procedure (n = 56) or VSRR (n = 84; 40 remodeling and 44 reimplantation). Bentall patients were older than VSRR patients (38 versus 29 years; p = 0.0001) and had more aortic dissections (16% versus 1%; p = 0.0012); more urgent/emergent surgery (20% versus 2%; p = 0.0008); larger preoperative sinus diameter (5.7 versus 5.1 cm; p = 0.0004); and more preoperative 3+/4+ aortic insufficiency (59% versus 10%; p valve replacement was 90% for VSRR patients. Eight-year survival was 90% for Bentall and 100% for VSRR patients (p = 0.01). Propensity-adjusted regression showed that the Bentall procedure did not predict mortality (p = 1.00) and did not protect from reoperation (odds ratio = 0.28; 95% confidence interval: 0.01 to 4.33; p = 0.36). The Bentall procedure and VSRR have similar operative results in Marfan syndrome. The procedures are distinguished by higher rates of thromboembolism among Bentall patients and higher rates of reoperation among VSRR patients. Lower late survival among Bentall patients probably reflects the preferential use of the Bentall procedure for higher risk patients.

  14. CAI and training system for the emergency operation procedure in the advanced thermal reactor, FUGEN

    International Nuclear Information System (INIS)

    Kozaki, T.; Imanaga, K.; Nakamura, S.; Maeda, K.; Sakurai, N.; Miyamoto, M.

    2003-01-01

    In the Advanced Thermal Reactor (ATR ) of the JNC, 'FUGEN', a symptom based Emergency Operating Procedure (EOF) was introduced in order to operate Fugen more safely and it became necessary for the plant operators to master the EOF. However it took a lot of time for the instructor to teach the EOP to operators and to train them. Thus, we have developed a Computer Aided Instruction (CAI) and Training System for the EOP, by which the operators can learn the EOP and can be trained. This system has two major functions, i.e., CAI and training. In the CAI function, there are three learning courses, namely, the EOP procedure, the simulation with guidance and Q and A, and the free simulation. In the training function, all of necessary control instruments (indicators, switches, annunciators and so forth) and physics models for the EOP training are simulated so that the trainees can be trained for all of the EOPs. In addition, 50 kinds of malfunction models are installed in order to perform appropriate accident scenarios for the EOP. The training of the EOP covers the range from AOO (Anticipated Operational Occurrence) to Over-DBAs (Design Based Accidents). This system is built in three personal computers that are connected by the computer network. One of the computers is expected to be used for the instructor and the other two are for the trainees. The EOP is composed of eight guidelines, such as 'Reactor Control' and 'Depression and Cooling', and the operation screens which are corresponded to the guidelines are respectively provided. According to the trial, we have estimated that the efficiency of the learning and the training would be improved about 30% for the trainee and about 75% for the instructor in the actual learning and training. (author)

  15. Generic procedure for designing and implementing plan management systems for space science missions operations

    Science.gov (United States)

    Chaizy, P. A.; Dimbylow, T. G.; Allan, P. M.; Hapgood, M. A.

    2011-09-01

    This paper is one of the components of a larger framework of activities whose purpose is to improve the performance and productivity of space mission systems, i.e. to increase both what can be achieved and the cost effectiveness of this achievement. Some of these activities introduced the concept of Functional Architecture Module (FAM); FAMs are basic blocks used to build the functional architecture of Plan Management Systems (PMS). They also highlighted the need to involve Science Operations Planning Expertise (SOPE) during the Mission Design Phase (MDP) in order to design and implement efficiently operation planning systems. We define SOPE as the expertise held by people who have both theoretical and practical experience in operations planning, in general, and in space science operations planning in particular. Using ESA's methodology for studying and selecting science missions we also define the MDP as the combination of the Mission Assessment and Mission Definition Phases. However, there is no generic procedure on how to use FAMs efficiently and systematically, for each new mission, in order to analyse the cost and feasibility of new missions as well as to optimise the functional design of new PMS; the purpose of such a procedure is to build more rapidly and cheaply such PMS as well as to make the latter more reliable and cheaper to run. This is why the purpose of this paper is to provide an embryo of such a generic procedure and to show that the latter needs to be applied by people with SOPE during the MDP. The procedure described here proposes some initial guidelines to identify both the various possible high level functional scenarii, for a given set of possible requirements, and the information that needs to be associated with each scenario. It also introduces the concept of catalogue of generic functional scenarii of PMS for space science missions. The information associated with each catalogued scenarii will have been identified by the above procedure and

  16. Impact of operator experience and training strategy on procedural outcomes with leadless pacing: Insights from the Micra Transcatheter Pacing Study.

    Science.gov (United States)

    El-Chami, Mikhael; Kowal, Robert C; Soejima, Kyoko; Ritter, Philippe; Duray, Gabor Z; Neuzil, Petr; Mont, Lluis; Kypta, Alexander; Sagi, Venkata; Hudnall, John Harrison; Stromberg, Kurt; Reynolds, Dwight

    2017-07-01

    Leadless pacemaker systems have been designed to avoid the need for a pocket and transvenous lead. However, delivery of this therapy requires a new catheter-based procedure. This study evaluates the role of operator experience and different training strategies on procedural outcomes. A total of 726 patients underwent implant attempt with the Micra transcatheter pacing system (TPS; Medtronic, Minneapolis, MN, USA) by 94 operators trained in a teaching laboratory using a simulator, cadaver, and large animal models (lab training) or locally at the hospital with simulator/demo model and proctorship (hospital training). Procedure success, procedure duration, fluoroscopy time, and safety outcomes were compared between training methods and experience (implant case number). The Micra TPS procedure was successful in 99.2% of attempts and did not differ between the 55 operators trained in the lab setting and the 39 operators trained locally at the hospital (P = 0.189). Implant case number was also not a determinant of procedural success (P = 0.456). Each operator performed between one and 55 procedures. Procedure time and fluoroscopy duration decreased by 2.0% (P = 0.002) and 3.2% (P safety outcomes by training method. Among a large group of operators, implantation success was high regardless of experience. While procedure duration and fluoroscopy times decreased with implant number, complications were low and not associated with case number. Procedure and safety outcomes were similar between distinct training methodologies. © 2017 Wiley Periodicals, Inc.

  17. 33 CFR Appendix D to Part 157 - Example of a Procedure for Dedicated Clean Ballast Tanks Operations

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Example of a Procedure for... ENVIRONMENT RELATING TO TANK VESSELS CARRYING OIL IN BULK Pt. 157, App. D Appendix D to Part 157—Example of a Procedure for Dedicated Clean Ballast Tanks Operations 1. Source. The example procedure for dedicated clean...

  18. Comparative Evaluation of Immediate Post-Operative Sequelae after Surgical Removal of Impacted Mandibular Third Molar with or without Tube Drain - Split-Mouth Study.

    Science.gov (United States)

    Kumar, Barun; Bhate, Kalyani; Dolas, R S; Kumar, Sn Santhosh; Waknis, Pushkar

    2016-12-01

    Third molar surgery is one of the most common surgical procedures performed in general dentistry. Post-operative variables such as pain, swelling and trismus are major concerns after impacted mandibular third molar surgery. Use of passive tube drain is supposed to help reduce these immediate post-operative sequelae. The current study was designed to compare the effect of tube drain on immediate post-operative sequelae following impacted mandibular third molar surgery. To compare the post-operative sequelae after surgical removal of impacted mandibular third molar surgery with or without tube drain. Thirty patients with bilateral impacted mandibular third molars were divided into two groups: Test (with tube drain) and control (without tube drain) group. In the test group, a tube drain was inserted through the releasing incision, and kept in place for three days. The control group was left without a tube drain. The post-operative variables like, pain, swelling, and trismus were calculated after 24 hours, 72 hours, 7 days, and 15 days in both the groups and analyzed statistically using chi-square and t-test analysis. The test group showed lesser swelling as compared to control group, with the swelling variable showing statistically significant difference at post-operative day 3 and 7 (p≤ 0.05) in both groups. There were no statistically significant differences in pain and trismus variables in both the groups. The use of tube drain helps to control swelling following impacted mandibular third molar surgery. However, it does not have much effect on pain or trismus.

  19. Classifier-ensemble incremental-learning procedure for nuclear transient identification at different operational conditions

    Energy Technology Data Exchange (ETDEWEB)

    Baraldi, Piero, E-mail: piero.baraldi@polimi.i [Dipartimento di Energia - Sezione Ingegneria Nucleare, Politecnico di Milano, via Ponzio 34/3, 20133 Milano (Italy); Razavi-Far, Roozbeh [Dipartimento di Energia - Sezione Ingegneria Nucleare, Politecnico di Milano, via Ponzio 34/3, 20133 Milano (Italy); Zio, Enrico [Dipartimento di Energia - Sezione Ingegneria Nucleare, Politecnico di Milano, via Ponzio 34/3, 20133 Milano (Italy); Ecole Centrale Paris-Supelec, Paris (France)

    2011-04-15

    An important requirement for the practical implementation of empirical diagnostic systems is the capability of classifying transients in all plant operational conditions. The present paper proposes an approach based on an ensemble of classifiers for incrementally learning transients under different operational conditions. New classifiers are added to the ensemble where transients occurring in new operational conditions are not satisfactorily classified. The construction of the ensemble is made by bagging; the base classifier is a supervised Fuzzy C Means (FCM) classifier whose outcomes are combined by majority voting. The incremental learning procedure is applied to the identification of simulated transients in the feedwater system of a Boiling Water Reactor (BWR) under different reactor power levels.

  20. Classifier-ensemble incremental-learning procedure for nuclear transient identification at different operational conditions

    International Nuclear Information System (INIS)

    Baraldi, Piero; Razavi-Far, Roozbeh; Zio, Enrico

    2011-01-01

    An important requirement for the practical implementation of empirical diagnostic systems is the capability of classifying transients in all plant operational conditions. The present paper proposes an approach based on an ensemble of classifiers for incrementally learning transients under different operational conditions. New classifiers are added to the ensemble where transients occurring in new operational conditions are not satisfactorily classified. The construction of the ensemble is made by bagging; the base classifier is a supervised Fuzzy C Means (FCM) classifier whose outcomes are combined by majority voting. The incremental learning procedure is applied to the identification of simulated transients in the feedwater system of a Boiling Water Reactor (BWR) under different reactor power levels.

  1. A New TS Algorithm for Solving Low-Carbon Logistics Vehicle Routing Problem with Split Deliveries by Backpack—From a Green Operation Perspective

    Science.gov (United States)

    Fu, Zhuo; Wang, Jiangtao

    2018-01-01

    In order to promote the development of low-carbon logistics and economize logistics distribution costs, the vehicle routing problem with split deliveries by backpack is studied. With the help of the model of classical capacitated vehicle routing problem, in this study, a form of discrete split deliveries was designed in which the customer demand can be split only by backpack. A double-objective mathematical model and the corresponding adaptive tabu search (TS) algorithm were constructed for solving this problem. By embedding the adaptive penalty mechanism, and adopting the random neighborhood selection strategy and reinitialization principle, the global optimization ability of the new algorithm was enhanced. Comparisons with the results in the literature show the effectiveness of the proposed algorithm. The proposed method can save the costs of low-carbon logistics and reduce carbon emissions, which is conducive to the sustainable development of low-carbon logistics. PMID:29747469

  2. A New TS Algorithm for Solving Low-Carbon Logistics Vehicle Routing Problem with Split Deliveries by Backpack-From a Green Operation Perspective.

    Science.gov (United States)

    Xia, Yangkun; Fu, Zhuo; Tsai, Sang-Bing; Wang, Jiangtao

    2018-05-10

    In order to promote the development of low-carbon logistics and economize logistics distribution costs, the vehicle routing problem with split deliveries by backpack is studied. With the help of the model of classical capacitated vehicle routing problem, in this study, a form of discrete split deliveries was designed in which the customer demand can be split only by backpack. A double-objective mathematical model and the corresponding adaptive tabu search (TS) algorithm were constructed for solving this problem. By embedding the adaptive penalty mechanism, and adopting the random neighborhood selection strategy and reinitialization principle, the global optimization ability of the new algorithm was enhanced. Comparisons with the results in the literature show the effectiveness of the proposed algorithm. The proposed method can save the costs of low-carbon logistics and reduce carbon emissions, which is conducive to the sustainable development of low-carbon logistics.

  3. Authorization procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1974-12-01

    For Belgium and Luxembourg, the authorization procedure varies according to the class in which the installation concerned falls (assigned according to the degree of hazard involved classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of class I and II installations. With respect to Germany also, two such separate authorizations are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the basic nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of classified installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of classified installations exist in the United Kingdom. Moreover, there is only one single authorization (the site licence), which is successively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  4. Licensing procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1976-08-01

    For Belgium and Luxembourg, the authorization procedure varies according to the Class in which the installation concerned falls (assigned according to the degree of hazard involved: Classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of Class I and II installations. With respect to Germany also, two such separate authorization are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the 'basic' nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of 'classified' installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of 'classified' installations exist in the United Kingdom. Moreover, there is only one single authorization (the 'site licence'), which is succesively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  5. A successful approach for the implementation of symptom-based emergency operating procedures for VVER reactors

    International Nuclear Information System (INIS)

    Lhoest, V.; Prior, R.; Pascal, G.

    2000-01-01

    The paper provides an overview of the organization, the progress and the results of the various Emergence Operating Procedure (EOP) development programs for VVER type reactors conducted by Westinghouse so far. The detailed working process is presented through the solutions to some major plant issues. The EOPs have been developed for the Temelin, Dukovany, Bohunice, Mochovce and Paks VVER nuclear power plants. The procedures are developed in working teams of experts from the utility and Westinghouse. The completion of the programs constitute an indication of the overall success of this approach. This is further reinforced by the general acceptance of the new procedures by the plant personnel, together with the good results obtained so far from procedure testing. This is also confirmed by a new PSA-level 1 analysis for Dukovany plant, which shows a significant improvement in the overall plant safety. This means a 20% reduction in the Core Damage Frequency due to the introduction of the new EOPs. The fact that some modifications have been implemented to the plants to solve design weaknesses identified in the course of this programs also constitute a positive result

  6. Applications of Operator-Splitting Methods to the Direct Numerical Simulation of Particulate and Free-Surface Flows and to the Numerical Solution of the Two-Dimensional Elliptic Monge--Ampère Equation

    OpenAIRE

    Glowinski, R.; Dean, E.J.; Guidoboni, G.; Juárez, L.H.; Pan, T.-W.

    2008-01-01

    The main goal of this article is to review some recent applications of operator-splitting methods. We will show that these methods are well-suited to the numerical solution of outstanding problems from various areas in Mechanics, Physics and Differential Geometry, such as the direct numerical simulation of particulate flow, free boundary problems with surface tension for incompressible viscous fluids, and the elliptic real Monge--Ampère equation. The results of numerical ...

  7. Procedure guide of design, construction of prototypes, calibration and sure operation of nucleonic control systems

    International Nuclear Information System (INIS)

    Banados Perez, H.; Griffith Martinez, J.; Desdin Garcia, L.F.; Rodriguez Cardona, R.L.; Molina, G.; Sebastian Calvo, C.

    1999-01-01

    This Guide was elaborated in the mark of the project RLA/8/024 ARCAL XLII 'Industrial Applications of the Tracer Technology and Nucleonic Control Systems'. Its objective is to establish the approaches for the design, the construction, the selection and the procedures for the sure operation of the Nucleonic Control Systems (NCS) in the industry. The NCS is used to control processes to high speeds, materials with extreme conditions or with noxious chemical properties, susceptible materials of being damaged by contact and packed products. In this document is defined the scope of the procedure. The SCN are classified according to: type of radiations, the mobility of the components, the degree of the beams collimation; and in function of the security. The design and construction criteria of the nuclear meters and of the systems of control nucleonic are exposed

  8. Short Operative Duration and Surgical Site Infection Risk in Hip and Knee Arthroplasty Procedures.

    Science.gov (United States)

    Dicks, Kristen V; Baker, Arthur W; Durkin, Michael J; Anderson, Deverick J; Moehring, Rebekah W; Chen, Luke F; Sexton, Daniel J; Weber, David J; Lewis, Sarah S

    2015-12-01

    To determine the association (1) between shorter operative duration and surgical site infection (SSI) and (2) between surgeon median operative duration and SSI risk among first-time hip and knee arthroplasties. Retrospective cohort study A total of 43 community hospitals located in the southeastern United States. Adults who developed SSIs according to National Healthcare Safety Network criteria within 365 days of first-time knee or hip arthroplasties performed between January 1, 2008 and December 31, 2012. Log-binomial regression models estimated the association (1) between operative duration and SSI outcome and (2) between surgeon median operative duration and SSI outcome. Hip and knee arthroplasties were evaluated in separate models. Each model was adjusted for American Society of Anesthesiology score and patient age. A total of 25,531 hip arthroplasties and 42,187 knee arthroplasties were included in the study. The risk of SSI in knee arthroplasties with an operative duration shorter than the 25th percentile was 0.40 times the risk of SSI in knee arthroplasties with an operative duration between the 25th and 75th percentile (risk ratio [RR], 0.40; 95% confidence interval [CI], 0.38-0.56; Poperative duration did not demonstrate significant association with SSI for hip arthroplasties (RR, 1.04; 95% CI, 0.79-1.37; P=.36). Knee arthroplasty surgeons with shorter median operative durations had a lower risk of SSI than surgeons with typical median operative durations (RR, 0.52; 95% CI, 0.43-0.64; Poperative durations were not associated with a higher SSI risk for knee or hip arthroplasty procedures in our analysis.

  9. An ergonomics study of computerized emergency operating procedures: Presentation style, task complexity, and training level

    International Nuclear Information System (INIS)

    Xu Song; Song Fei; Li Zhizhong; Zhao Qianyi; Luo Wei; He Xuhong; Salvendy, Gavriel

    2008-01-01

    Emergency operating procedures (EOPs) are widely used in nuclear power plants (NPPs). With the development of information technology, computerized EOPs are taking the place of paper-based ones. Unlike paper-based EOPs, the industrial practice of computerized EOPs is still quite limited. Ergonomics issues of computerized EOPs have not been studied adequately. This study focuses on the effects of EOP presentation style, task complexity, and training level on the performance of the operators in the execution of computerized EOPs. One simulated computerized EOP system was developed to present two EOPs, each with different task complexity levels, by two presentation styles (Style A: one- and two-dimensional flowcharts combination; Style B: two-dimensional flowchart and success logic tree combination). Forty subjects participated in the experiment of EOP execution using the simulated system. Statistical analysis of the experimental results indicates that: (1) complexity, presentation style, and training level all can significantly influence the error rate. High-complexity tasks and lack of sufficient training may lead to a higher error rate. Style B caused a significantly higher error rate than style A did in the skilled phase. So the designers of computerized procedures should take the presentation styles of EOPs into account. (2) Task complexity and training level can significantly influence operation time. No significant difference was found in operation time between the two presentation styles. (3) Training level can also significantly influence the subjective workload of EOPs operations. This implies that adequate training is very important for the performance of computerized EOPs even if emergency responses with computerized EOPs are much more simple and easy than that with paper-based EOPs

  10. An ergonomics study of computerized emergency operating procedures: Presentation style, task complexity, and training level

    Energy Technology Data Exchange (ETDEWEB)

    Xu Song; Song Fei [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China); Li Zhizhong [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China)], E-mail: zzli@tsinghua.edu.cn; Zhao Qianyi; Luo Wei [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China); He Xuhong [Scanpower Risk Management China Inc., Towercrest International Plaza, No. 3 Maizidian West Road, Chaoyang District, Beijing 100016 (China); Salvendy, Gavriel [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China)

    2008-10-15

    Emergency operating procedures (EOPs) are widely used in nuclear power plants (NPPs). With the development of information technology, computerized EOPs are taking the place of paper-based ones. Unlike paper-based EOPs, the industrial practice of computerized EOPs is still quite limited. Ergonomics issues of computerized EOPs have not been studied adequately. This study focuses on the effects of EOP presentation style, task complexity, and training level on the performance of the operators in the execution of computerized EOPs. One simulated computerized EOP system was developed to present two EOPs, each with different task complexity levels, by two presentation styles (Style A: one- and two-dimensional flowcharts combination; Style B: two-dimensional flowchart and success logic tree combination). Forty subjects participated in the experiment of EOP execution using the simulated system. Statistical analysis of the experimental results indicates that: (1) complexity, presentation style, and training level all can significantly influence the error rate. High-complexity tasks and lack of sufficient training may lead to a higher error rate. Style B caused a significantly higher error rate than style A did in the skilled phase. So the designers of computerized procedures should take the presentation styles of EOPs into account. (2) Task complexity and training level can significantly influence operation time. No significant difference was found in operation time between the two presentation styles. (3) Training level can also significantly influence the subjective workload of EOPs operations. This implies that adequate training is very important for the performance of computerized EOPs even if emergency responses with computerized EOPs are much more simple and easy than that with paper-based EOPs.

  11. The step complexity measure for emergency operating procedures - comparing with simulation data

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea; Kim, Jaewhan; Ha, Jaejoo; Shin, Yunghwa

    2001-01-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human errors play a major role in many accidents. Therefore, to prevent occurrences of accidents or to ensure system safety, extensive effort has been made to identify significant factors that cause human errors. According to related studies, written manuals or operating procedures are revealed as one of the most important factors, and complexity or understandability of a procedure is pointed out as one of the major reasons that make procedure-related human errors. Many qualitative checklists are suggested to evaluate emergency operating procedures (EOPs) of NPPs. However, since qualitative evaluations using checklists have some drawbacks, a quantitative measure that can quantify the complexity of EOPs is imperative to compensate for them. In order to quantify the complexity of EOPs, Park et al. suggested the step complexity (SC) measure to quantify the complexity of a step included in EOPs. In this paper, to ensure the appropriateness of the SC measure, SC scores are compared with averaged step performance time data obtained from emergency training records. The total number of available records is 36, and training scenarios are the loss of coolant accident and the excess steam dump event. The number of scenario is 18 each. From these emergency training records, step performance time data for 39 steps are retrieved, and they are compared with estimated SC scores of them. In addition, several questions that are needed to clarify the appropriateness of the SC measure are also discussed. As a result, it was observed that estimated SC scores and step performance time data have a statistically meaningful correlation. Thus, it can be concluded that the SC measure can quantify the complexity of steps included in EOPs

  12. A decision support system for identifying abnormal operating procedures in a nuclear power plant

    International Nuclear Information System (INIS)

    Hsieh, Min-Han; Hwang, Sheue-Ling; Liu, Kang-Hong; Liang, Sheau-Farn Max; Chuang, Chang-Fu

    2012-01-01

    Highlights: ► A decision support system has been constructed and verified. ► The operator's decision-making time was decreased by about 25%. ► The accuracy was increased by about 18%. ► The system prevents overlooking important information. ► Fewer erroneous solutions were implemented, and the mental workload was reduced. - Abstract: In order to prevent safety hazards that can result from inappropriate decisions made by the operators of a nuclear power plant (NPP), this study was undertaken to develop a decision support system to reduce the complexity of the decision-making process by aiding operators’ cognitive activities, integrating unusual symptoms, and identifying the most suitable abnormal operating procedure (AOP) for operators. The study was conducted from the perspective of human factors engineering in order to compare the process that operators originally used to select an AOP with a process that included a support system for AOP identification. The results of the study indicated that the existence of a support system reduces errors by quickly suggesting likely AOPs. With such a support system in place, there were clear improvements in human performance, i.e., decision-making time decreased by about 25%, and the accuracy of the operators’ decisions, judged by the successful resolution of specific problems, increased by about 18%. In addition, there were fewer erroneous solutions implemented, and the mental workload was reduced. Hence, the decision support system is proposed as a training tool in identifying AOPs in the main control room (MCR).

  13. Minimally Invasive Catheter Procedures to Assist Complicated Pacemaker Lead Extraction and Implantation in the Operating Room

    International Nuclear Information System (INIS)

    Kröpil, Patric; Lanzman, Rotem S.; Miese, Falk R.; Blondin, Dirk; Winter, Joachim; Scherer, Axel; Fürst, Günter

    2011-01-01

    We report on percutaneous catheter procedures in the operating room (OR) to assist complicated manual extraction or insertion of pacemaker (PM) and implantable cardioverter defibrillator leads. We retrospectively reviewed complicated PM revisions and implantations performed between 2004 and 2009 that required percutaneous catheter procedures performed in the OR. The type of interventional procedure, catheter and retrieval system used, venous access, success rates, and procedural complications were analyzed. In 41 (12 female and 29 male [mean age 62 ± 17 years]) of 3021 (1.4%) patients, standard manual retrieval of old leads or insertion of new leads was not achievable and thus required percutaneous catheter intervention for retrieval of misplaced leads and/or recanalisation of occluded central veins. Thirteen of 18 (72.2%) catheter-guided retrieval procedures for misplaced (right atrium [RA] or ventricle [RV; n = 3], superior vena cava [n = 2], brachiocephalic vein [n = 5], and subclavian vein [n = 3]) lead fragments in 16 patients were successful. Percutaneous catheter retrieval failed in five patients because there were extremely fixed or adhered lead fragments. Percutaneous transluminal angiography (PTA) of central veins for occlusion or high-grade stenosis was performed in 25 patients. In 22 of 25 patients (88%), recanalization of central veins was successful, thus enabling subsequent lead replacement. Major periprocedural complications were not observed. In the case of complicated manual PM lead implantation or revision, percutaneous catheter-guided extraction of misplaced lead fragments or recanalisation of central veins can be performed safely in the OR, thus enabling subsequent implantation or revision of PM systems in the majority of patients.

  14. Systematic Procedure for Integrated Process Operation: Reverse Electro-Enhanced Dialysis (REED) during Lactic Acid Fermentation

    DEFF Research Database (Denmark)

    Prado Rubio, Oscar Andres; Jørgensen, Sten Bay; Jonsson, Gunnar Eigil

    2011-01-01

    The integration of lactic acid fermentation and Reverse Electro-Enhanced Dialysis (REED) is investigated based upon previously developed mathematical models. A goal driven process and operation design procedure is proposed and partially investigated. The conceptual analysis of the processes...... integration shows the need for an additional pH controller in the fermenten A PI controller is implemented and tested. The complete control structure for the integrated system consists of this PI controller in the fermenter plus a previously developed (Prado-Rubio et al., 2010) input resetting control...

  15. Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing

    Science.gov (United States)

    2018-04-27

    Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing 5a. CONTRACT...NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...ORGANIZATION NAME(S) AND ADDRESS(ES) US Army Dugway Proving Ground West Desert Test Center (TEDT-DPW) Dugway, UT 84022-5000 8. PERFORMING ORGANIZATION

  16. Windows Calorimeter Control (WinCal) system configuration control board (SCCB) operating procedure

    International Nuclear Information System (INIS)

    Westsik, G.A.

    1997-01-01

    This document describes the operating procedure for the System Configuration Control Board (SCCB) performed in support of the Windows Calorimeter Control (WinCal) system. This board will consist of representatives from Babcock and Wilcox Hanford Company Babcock and Wilcox Protec, Inc.; and Lockheed Martin Services, Inc. In accordance with agreements for the joint use of the Babcock and Wilcox Hanford Company calorimeters located in the Hanford Site Plutonium Finishing Plant (PFP) Nondestructive Assay Laboratory, concurrence regarding changes to the WinCal system will be obtained from the International Atomic Energy Agency (IAEA). Further, changes to the WinCal software will be communicated to Los Alamos National Laboratory

  17. Operating procedures for the manufacture of radioactive SYNROC in the actinide laboratory

    International Nuclear Information System (INIS)

    Western, K.F.

    1986-03-01

    The purpose of this manual is to acquaint the operator with the procedures required to manufacture SYNROC-containing radioactive materials in the SYNROC actinide laboratory, Lucas Heights Research Laboratories. The actinide-doped SYNROC production facility is a series of four interconnected glove boxes and one free-standing glove box. The samples of radioactive SYNROC produced in the actinide laboratory are used to carry out physical testing of the product at various laboratories on site, e.g. leach testing, auto-radiographic examination, electron-microscopc examination, atomic absorption spectrophotometry and analysis

  18. Safety and application of procedures or: how do ''they'' have to use operating procedures in nuclear power plants

    International Nuclear Information System (INIS)

    Dien, Y.

    1993-03-01

    Emergency procedures are inescapable aspects of safety. They can be seen as the laws to be respected in an accident situation. But as for all laws, there remains the problem of their application: should strict adherence to the procedure be imposed under all circumstances. Is this possible. Are there any potential risks with such a requirement. Or, on the contrary, should application be more ''open'', more flexible, allowing for adaptation to the actual situation. But what are the potential risks involved in this approach. Are these two approaches to the application of procedures mutually exclusive, or are they complementary. This paper analyzes the nature of the problem of application of procedures and proposes orientations for further thought on the matter. (author). 11 refs

  19. Operational circular No.10 – Principles and procedures governing investigation of fraud

    CERN Multimedia

    2013-01-01

    Operational Circular No. 10 entitled “Principles and procedures governing investigation of Fraud”, approved by the Director-General following discussion at the Standing Concertation Committee meeting of 4 December 2012 and entering into force on 1 January 2013, is available on the intranet site of the Human Resources Department.   This circular is applicable to all persons working at or on behalf of CERN. The purpose of this new operational circular is to specify the definition of fraud and to lay down the Organization’s fraud investigation process pursuant to the CERN Anti-fraud Policy and in accordance with the principles of due process. Department Head Office HR Department

  20. Aortic root reimplantation procedure: a new milestone in aortic valve-sparing operations

    Directory of Open Access Journals (Sweden)

    А. М. Чернявский

    2016-08-01

    Full Text Available Aim: Emphasis in this study was placed on clinical and functional assessment of a modified "Florida Sleeve" procedure during surgical correction of ascending aorta aneurysms with concomitant aortic insufficiency.Methods: 32 patients with an aneurysm of the ascending aorta and aortic insufficiency underwent a modified "Florida Sleeve" procedure. The average follow-up was 17 (0-60 months. The average age of patients was 57±13 (23-73 years 56±13 years.Results: The expected 4-year cumulative survival rate was 84.3%. Overall freedom from aortic insufficiency in the late period was 88.9%. Median aortic regurgitation was 1+ (1; 2. Long-term follow-up revealed no valve-associated complications.Conclusion: The aortic root reimplantation procedure enables optimal correction of the existing lesions of the aortic root without performing aortic valve replacement and demonstrates stable clinical and functional outcomes in the long-term period.Key words: aortic aneurysm; aortic valve; valve-sparing operations.FundingThe study had no sponsorship.Conflict of interestThe authors declare no conflict of interest.

  1. Development of the step complexity measure for emergency operating procedures using entropy concepts

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea; Ha, Jaejoo

    2001-01-01

    For a nuclear power plant (NPP), symptom-based emergency operating procedures (EOPs) have been adopted to enhance the safety of NPPs through reduction of operators' workload under emergency conditions. Symptom-based EOPs, however, could place a workload on operators because they have to not only identify related symptoms, but also understand the context of steps that should be carried out. Therefore, many qualitative checklists are suggested to ensure the appropriateness of steps included in EOPs. However, since these qualitative evaluations have some drawbacks, a quantitative measure that can roughly estimate the complexity of EOP steps is imperative to compensate for them. In this paper, a method to evaluate the complexity of an EOP step is developed based on entropy measures that have been used in software engineering. Based on these, step complexity (SC) measure that can evaluate SC from various viewpoints (such as the amount of information/operators' actions included in each EOP step, and the logic structure of each EOP step) was developed. To verify the suitableness of the SC measure, estimated SC values are compared with subjective task load scores obtained from the NASA-TLX (task load index) method and step performance time obtained from a full scope simulator. From these comparisons, it was observed that estimated SC values generally agree with the NASA-TLX scores and step performance time data. Thus, it could be concluded that the developed SC measure would be considered for evaluating SC of an EOP step

  2. Influence of step complexity and presentation style on step performance of computerized emergency operating procedures

    Energy Technology Data Exchange (ETDEWEB)

    Xu Song [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China); Li Zhizhong [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China)], E-mail: zzli@tsinghua.edu.cn; Song Fei; Luo Wei; Zhao Qianyi; Salvendy, Gavriel [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China)

    2009-02-15

    With the development of information technology, computerized emergency operating procedures (EOPs) are taking the place of paper-based ones. However, ergonomics issues of computerized EOPs have not been studied adequately since the industrial practice is quite limited yet. This study examined the influence of step complexity and presentation style of EOPs on step performance. A simulated computerized EOP system was developed in two presentation styles: Style A: one- and two-dimensional flowcharts combination; Style B: two-dimensional flowchart and success logic tree combination. Step complexity was quantified by a complexity measure model based on an entropy concept. Forty subjects participated in the experiment of EOP execution using the simulated system. The results of data analysis on the experiment data indicate that step complexity and presentation style could significantly influence step performance (both step error rate and operation time). Regression models were also developed. The regression analysis results imply that operation time of a step could be well predicted by step complexity while step error rate could only partly predicted by it. The result of a questionnaire investigation implies that step error rate was influenced not only by the operation task itself but also by other human factors. These findings may be useful for the design and assessment of computerized EOPs.

  3. SWIFT BAT Loop Heat Pipe Thermal System Characteristics and Ground/Flight Operation Procedure

    Science.gov (United States)

    Choi, Michael K.

    2003-01-01

    The SWIFT Burst Alert Telescope (BAT) Detector Array has a total power dissipation of 208 W. To meet the stringent temperature gradient and thermal stability requirements in the normal operational mode, and heater power budget in both the normal operational and safehold modes, the Detector Array is thermally well coupled to eight constant conductance heat pipes (CCHPs) embedded in the Detector Array Plate (DAP), and two loop heat pipes (LHPs) transport heat fiom the CCHPs to a radiator. The CCHPs have ammonia as the working fluid and the LHPs have propylene as the working fluid. Precision heater controllers, which have adjustable set points in flight, are used to control the LHP compensation chamber and Detector Array XA1 ASIC temperatures. The radiator has the AZ-Tek AZW-LA-II low-alpha white paint as the thermal coating and is located on the anti-sun side of the spacecraft. This paper presents the characteristics, ground operation and flight operation procedures of the LHP thermal system.

  4. 40 CFR Appendix K to Part 75 - Quality Assurance and Operating Procedures for Sorbent Trap Monitoring Systems

    Science.gov (United States)

    2010-07-01

    ... Pump. Use a leak-tight, vacuum pump capable of operating within the candidate system's flow range. 5.1... sorbent trap monitoring system typically operates. The gas flow meter shall be equipped with any necessary... system typically operates. You may either follow the procedures in section 10.3.1 of Method 5 in appendix...

  5. Stimulus- and response-reinforcer contingencies in autoshaping, operant, classical, and omission training procedures in rats.

    Science.gov (United States)

    Atnip, G W

    1977-07-01

    Separate groups of rats received 500 trials of lever-press training under autoshaping (food delivery followed 10-second lever presentations, or occurred immediately following a response); operant conditioning (responding was necessary for food delivery); and classical conditioning (food followed lever presentations regardless of responding). Each group then received 500 trials on an omission procedure in which food was omitted on trials with a response. Another group received 1000 trials on the omission procedure, and a fifth group, random control, received 1000 uncorrelated presentations of lever and food. The autoshaping, operant, and classical groups reached high response levels by the end of initial training. Acquisition was fastest in the autoshaping group. Responding remained consistently low in the control group. The omission group responded at a level between the control group and the other three groups. During omission training, responding in these three groups declined to the omission-group level. During omission training, the rats continued contacting the lever frequently after lever pressing had declined. Response maintenance under omission training seems not to require topographic similarity between the response and reinforcer-elicited consummatory behaviors.

  6. General decoupling procedure for expectation values of four-operator products in electron–phonon quantum kinetics

    International Nuclear Information System (INIS)

    Teeny, Nicolas; Fähnle, Manfred

    2013-01-01

    In the density-matrix formalism of electron–phonon quantum kinetics, the hierarchy of infinitely many coupled equations of motion for the expectation values of products of electron and phonon creation and annihilation operators of arbitrary order is usually terminated on the level of the equations of motion for the expectation values of three-operator products by using decoupling procedures for the four-operator products occurring in these equations. In the literature, decoupling procedures are discussed for special types of electron and phonon states. In the present paper, generalized decoupling procedures are derived for arbitrary electron and phonon states. (paper)

  7. Mandibular marginal contouring in oriental aesthetic surgery: refined surgical concept and operative procedure.

    Science.gov (United States)

    Satoh, Kaneshige; Mitsukawa, Nobuyuki

    2014-05-01

    In aesthetic mandibular contouring surgery, which is often conducted in Asians, the operative procedure is thought to deliver a more aesthetic mandibular shape by means of contouring conducted as a whole from the ramus to the symphysis. The authors describe the refined concept and operative procedures of mandibular marginal contouring. For the 7-year period from 2004 to 2011, mandibular marginal contouring has been used in 57 consecutive series of Japanese subjects. Patient ages ranged from 18 to 33 years, and the subjects included 15 men and 42 women. The surgery was carried out by cutting off the protruding deformed mandibular margin from the ramus to the symphysis. In 53 of 57 cases, the focus was on angle contouring. Concomitant genioplasty by horizontal osteotomy of the chin was conducted in 42 of 57 cases (recession, advancement, shortening, elongation, and correction of the shift variously). In 22 materials exhibiting bulk around the mandibular, the ramus to the body was excised sagittally and thinned. In all the patients, mandibular marginal contouring from the ramus to the symphysis was completed. Partial masseter muscle resection was conducted in 11 of 57 cases. Mandibular contouring effectively achieved a highly satisfactory result in all cases. The upper portion of the peripheral branch of the trunk of the mental nerve was dissected by an electric scalpel in 1 case but sutured immediately using an 8-0 nylon stitch. Transient palsy of the mental nerve was noticed in a few cases but subsided in 1 to 2 months. No particular complications were encountered. No secondary revision was required in this series. In mandibular angle plasty, mandibular marginal contouring from the ramus to the symphysis should be carried out by cutting off the angle keeping in mind the entire mandibular shape. This concept and the procedure can deliver greater patient satisfaction.

  8. Task Analysis of Emergency Operating Procedures for Generating Quantitative HRA Data

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yochan; Park, Jinkyun; Kim, Seunghwan; Choi, Sun Yeong; Jung, Wondea; Jang, Inseok [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    In this paper, the analysis results of the emergency task in the procedures (EOPs; emergency operating procedures) that can be observed from the simulator data are introduced. The task type, component type, system type, and additional information related with the performance of the operators were described. In addition, a prospective application of the analyzed information to HEP quantification process was discussed. In the probabilistic safety analysis (PSA) field, various human reliability analyses (HRAs) have been performed to produce estimates of human error probabilities (HEPs) for significant tasks in complex socio-technical systems. To this end, Many HRA methods have provided basic or nominal HEPs for typical tasks and the quantitative relations describing how a certain performance context or performance shaping factors (PSFs) affects the HEPs. In the HRA community, however, the necessity of appropriate and sufficient human performance data has been recently indicated. This is because a wide range of quantitative estimates in the previous HRA methods are not supported by solid empirical bases. Hence, there have been attempts to collect HRA supporting data. For example, KAERI has started to collect information on both unsafe acts of operators and the relevant PSFs. A characteristic of the database that is being developed at KAERI is that human errors and related PSF surrogates that can be objectively observable are collected from full-scope simulator experiences. In this environment, to produce concretely grounded bases of the HEPs, the traits or attributes of tasks where significant human errors can be observed should be definitely determined. The determined traits should be applicable to compare the HEPs on the traits with the data in previous HRA methods or databases. In this study, task characteristics in a Westinghouse type of EOPs were analyzed with the defining task, component, and system taxonomies.

  9. Operation Procedure of Inspection Equipment for TRISO-coated Fuel Particle

    International Nuclear Information System (INIS)

    Kim, S. H.; Kim, Y. K.; Cho, M. S.; Kim, Y. M.; Park, J. Y.; Kim, W. J.; Jeong, K. C.; Oh, S. C.; Lee, Y. W.

    2007-03-01

    TRISO-coated fuel particle for HTGR(high temperature gas cooled reactor) is composed of fuel kernel and coating layers. The kernel and coated particle are characterized by inspection processes for inspection items such as diameter of kernel, thickness, density and an-isotropy of coating layer. The coating thickness can be nondestructively measured by X-ray inspection equipment. The coating thickness as well as the sphericity can be also measured by optical inspection system as a ceramography method. The an-isotropy can be characterized by photometer. The density of coating layer can be measured by density column. The size and sphericity of particles can be measured by PSA(particle size analyzer). The thermo-chemical characteristics of kernel can be analyzed by TG/DTA(Thermogravimetric/Differential Thermal Analyzer). The inspection objective, equipment composition, operation principle, operation manual for each equipment was described in this operation procedure, which will be used for the characterization of inspection items described above

  10. Process improvement of the emergency operating procedures for Embalse Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Mariotti, A.D.; Pomerantz, M.; Moreno, C., E-mail: dmariotti@na-sa.com.ar, E-mail: mpomerantz@na-sa.com.ar, E-mail: cmoreno@na-sa.com.ar [Embalse Nuclear Power Plant, Nuclear Safety Dept., Embalse (Argentina)

    2014-07-01

    Emergency Operating Procedures (EOP) package of the Embalse Nuclear Power Plant (CNE) were made entirely by the plant staff since the beginning of its operation. With the emergence of Severe Accidents Guidelines (SAMG) and the latest events related to Fukushima, the EOP philosophy should include a new concept. It should consider that the EOP may be unsuccessful and an exit to the SAMG must be necessary. However, due to abnormal event mitigation using EOP is the way to prevent the beginning of a severe accident, EOP always had significant relevance in the plant documentation. For this reason, added to the overall requirement of an exit to the SAMG, it emerges a general review of the use efficiency of the EOP during an abnormal event. For this reason, a comprehensive process improvement has emerged using the operating experience, full-scope simulator training of the control room staff, advances in technology and the arrival of new generations. In this work, fundamental changes, new document format and ergonomic redesign for validation at full-scope simulator and use at main control room of new EOP for CNE are presented. (author)

  11. Modification of Operating Procedure for EZ-Retriever (Trademark) Microwave to Produce Consistent and Reproducible Immunohistochemical Results

    National Research Council Canada - National Science Library

    Tompkins, Christina P; Fath, Denise M; Hamilton, Tracey A; Kan, Robert K

    2006-01-01

    The present study was conducted to optimize the operating procedure for the EZ- Retriever" microwave oven to produce consistent and reproducible staining results with microtubule-associated protein 2 (MAP-2...

  12. Financial Reporting Procedures for Defense Distribution Depots - Defense Logistics Agency Business Area of the Defense Business Operations Fund

    National Research Council Canada - National Science Library

    Young, Shelton

    1994-01-01

    In our audit of the FY 1993 Financial Statements for the Distribution Depots--Defense Logistics Agency Business Mea of the Defense Business Operations Fund, we evaluated procedures and controls used...

  13. Procedures to evaluate the efficiency of protective clothing worn by operators applying pesticide.

    Science.gov (United States)

    Espanhol-Soares, Melina; Nociti, Leticia A S; Machado-Neto, Joaquim Gonçalves

    2013-10-01

    The evaluation of the efficiency of whole-body protective clothing against pesticides has already been carried out through field tests and procedures defined by international standards, but there is a need to determine the useful life of these garments to ensure worker safety. The aim of this article is to compare the procedures for evaluating efficiency of two whole-body protective garments, both new and previously used by applicators of herbicides, using a laboratory test with a mannequin and in the field with the operator. The evaluation of the efficiency of protective clothing used both quantitative and qualitative methodologies, leading to a proposal for classification according to efficiency, and determination of the useful life of protective clothing for use against pesticides, based on a quantitative assessment. The procedures used were in accordance with the standards of the modified American Society for Testing and Materials (ASTM) F 1359:2007 and International Organization for Standardization 17491-4. The protocol used in the field was World Health Organization Vector Biology and Control (VBC)/82.1. Clothing tested was personal water repellent and pesticide protective. Two varieties of fabric were tested: Beige (100% cotton) and Camouflaged (31% polyester and 69% cotton). The efficiency in exposure control of the personal protective clothing was measured before use and after 5, 10, 20, and 30 uses and washes under field conditions. Personal protective clothing was worn by workers in the field during the application of the herbicide glyphosate on weed species in mature sugar cane plantations using a knapsack sprayer. The modified ASTM 1359:2007 procedure was chosen as the most appropriate due to its greater repeatability (lower coefficient of variation). This procedure provides quantitative evaluation needed to determine the efficiency and useful life of individual protective clothing, not just at specific points of failure, but according to dermal

  14. RECOMMENDED OPERATING PROCEDURE NO. 56: COLLECTION OF GASEOUS GRAB SAMPLES FROM COMBUSTION SOURCES FOR NITROUS OXIDE MEASUREMENT

    Science.gov (United States)

    The document is a recommended operating procedure, prepare or use in research activities conducted by EPA's Air and Energy Engineering Research Laboratory (AEERL). The procedure applies to the collection of gaseous grab samples from fossil fuel combustion sources for subsequent a...

  15. Splitting Functions at High Transverse Momentum

    CERN Document Server

    Moutafis, Rhea Penelope; CERN. Geneva. TH Department

    2017-01-01

    Among the production channels of the Higgs boson one contribution could become significant at high transverse momentum which is the radiation of a Higgs boson from another particle. This note focuses on the calculation of splitting functions and cross sections of such processes. The calculation is first carried out on the example $e\\rightarrow e\\gamma$ to illustrate the way splitting functions are calculated. Then the splitting function of $e\\rightarrow eh$ is calculated in similar fashion. This procedure can easily be generalized to processes such as $q\\rightarrow qh$ or $g\\rightarrow gh$.

  16. The utility experience of implementing the emergency operating procedure tracking system

    International Nuclear Information System (INIS)

    Chang, W.C.; Cheng, J.F.

    1990-01-01

    This report presents the experience of a project sponsored by the Electric Power Research Institute (EPRI), Taiwan Power Company (TPC) and supported by the Nuclear Software Service (NSS), General Electric Company (GE) and Science Applications International Corporation (SAIC) to implement the Emergency Operating Procedure Tracking System (EOPTS) in Kuosheng Nuclear Power Station Simulator. Before implement the EOPTS in Kuosheng Simulator, the Safety Parameter Display System (SPDS) of the Energency Response Facility Technical Data System (ERFTDS) shall be simulated, the hardware and software linkage between the simulator and ERFTDS shall be established, that include installation of a VAX-8200 computer, Gould - Vax computer hardware linkage, ERFTDS software installation, simulator source variables selection and linkage it to the ERFTDS database

  17. Smart Wireless Power Transfer Operated by Time-Modulated Arrays via a Two-Step Procedure

    Directory of Open Access Journals (Sweden)

    Diego Masotti

    2015-01-01

    Full Text Available The paper introduces a novel method for agile and precise wireless power transmission operated by a time-modulated array. The unique, almost real-time reconfiguration capability of these arrays is fully exploited by a two-step procedure: first, a two-element time-modulated subarray is used for localization of tagged sensors to be energized; the entire 16-element TMA then provides the power to the detected tags, by exploiting the fundamental and first-sideband harmonic radiation. An investigation on the best array architecture is carried out, showing the importance of the adopted nonlinear/full-wave computer-aided-design platform. Very promising simulated energy transfer performance of the entire nonlinear radiating system is demonstrated.

  18. Colovaginal anastomosis: an unusual complication of stapler use in restorative procedure after Hartmann operation

    Directory of Open Access Journals (Sweden)

    Liao Guoqing

    2005-11-01

    Full Text Available Abstract Background Rectovaginal fistula is uncommon after lower anterior resection for rectal cancer. The most leading cause of this complication is involvement of the posterior wall of the vagina into the staple line when firing the circular stapler. Case presentation A 50-year-old women underwent resection for obstructed carcinoma of the sigmoid colon with Hartmann procedure. Four months later she underwent restorative surgery with circular stapler. Following which she developed rectovaginal fistula. A transvaginal repair was performed but stool passing from vagina not per rectum. Laporotomy revealed colovaginal anastomosis, which was corrected accordingly. Patient had an uneventful recovery. Conclusion Inadvertent formation of colovaginal anastomosis associated with a rectovaginal fistula is a rare complication caused by the operator's error. The present case again highlights the importance of ensuring that the posterior wall of vagina is away from the staple line.

  19. Framework and operational procedure for implementing Strategic Environmental Assessment in China

    International Nuclear Information System (INIS)

    Bao Cunkuan; Lu Yongsen; Shang Jincheng

    2004-01-01

    Over the last 20 years, Environmental Impact Assessment (EIA) has been implemented and become an important instrument for decision-making in development projects in China. The Environmental Impact Assessment Law of the P.R. China was promulgated on 28 October 2002 and will be put into effect on 1 September of 2003. The law provides that Strategic Environmental Assessment (SEA) is required in regional and sector plans and programs. This paper introduces the research achievements and practice of SEA in China, discusses the relationship of SEA and 'integrating of environment and development in decision-making (IEDD)', and relevant political and legal basis of SEA. The framework and operational procedures of SEA administration and enforcement are presented. Nine cases are analyzed and some proposals are given

  20. A Heuristic Procedure for the Outbound Container Relocation Problem during Export Loading Operations

    Directory of Open Access Journals (Sweden)

    Roberto Guerra-Olivares

    2015-01-01

    Full Text Available During export ship loading operations, it is often necessary to perform relocation movements with containers that interfere with access to the desired container in the ship loading sequence. This paper presents a real-time heuristic procedure for the container relocation problem employing reachstacker vehicles as container handling equipment. The proposed heuristic searches for good relocation coordinates within a set of nearby bays. The heuristic has a parameter that determines how far from the original bay a container may be relocated. The tradeoff between reducing relocation movements and limiting vehicle travel distances is examined and the performance of the heuristic is compared with a common practice in the smaller container terminals in Chile and Mexico. Finally, a mathematical model for the container relocation problem is presented.

  1. Lessons learned from the special inspection program for emergency operating procedures: Conducted March--October 1988

    International Nuclear Information System (INIS)

    1989-04-01

    The results of the team inspections conducted during 1988 for the Nuclear Regulatory Commission (NRC) Emergency Operating Procedures (EOPs) Inspection Program are summarized in this report. Inspection results are discussed in relation to past staff guidance provided to utilities for upgrade of EOPs. In this report the NRC presents information of particular interest to the nuclear power industry regarding concerns that were identified during the EOP team inspections and restates the staff's previous guidance in a format that more clearly illustrates the consequences of programmatic weaknesses. The information contained in this report is provided so that licensees may take advantage of the lessons learned from the EOP inspection effort. This report does not impose any new requirements related to the upgrading of EOPs. 7 refs

  2. Study of coherent Synchrotron Radiation effects by means of a new simulation code based on the non-linear extension of the operator splitting method

    International Nuclear Information System (INIS)

    Dattoli, G.; Schiavi, A.; Migliorati, M.

    2006-03-01

    The coherent synchrotron radiation (CSR) is one of the main problems limiting the performance of high intensity electron accelerators. The complexity of the physical mechanisms underlying the onset of instabilities due to CSR demands for accurate descriptions, capable of including the large number of features of an actual accelerating device. A code devoted to the analysis of this type of problems should be fast and reliable, conditions that are usually hardly achieved at the same rime. In the past, codes based on Lie algebraic techniques , have been very efficient to treat transport problems in accelerators. The extension of these methods to the non-linear case is ideally suited to treat CSR instability problems. We report on the development of a numerical code, based on the solution of the Vlasov equation, with the inclusion of non-linear contribution due to wake field effects. The proposed solution method exploits an algebraic technique, using exponential operators. We show that the integration procedure is capable of reproducing the onset of an instability and the effects associated with bunching mechanisms leading to the growth of the instability itself. In addition, considerations on the threshold of the instability are also developed [it

  3. Study of coherent synchrotron radiation effects by means of a new simulation code based on the non-linear extension of the operator splitting method

    International Nuclear Information System (INIS)

    Dattoli, G.; Migliorati, M.; Schiavi, A.

    2007-01-01

    The coherent synchrotron radiation (CSR) is one of the main problems limiting the performance of high-intensity electron accelerators. The complexity of the physical mechanisms underlying the onset of instabilities due to CSR demands for accurate descriptions, capable of including the large number of features of an actual accelerating device. A code devoted to the analysis of these types of problems should be fast and reliable, conditions that are usually hardly achieved at the same time. In the past, codes based on Lie algebraic techniques have been very efficient to treat transport problems in accelerators. The extension of these methods to the non-linear case is ideally suited to treat CSR instability problems. We report on the development of a numerical code, based on the solution of the Vlasov equation, with the inclusion of non-linear contribution due to wake field effects. The proposed solution method exploits an algebraic technique that uses the exponential operators. We show that the integration procedure is capable of reproducing the onset of instability and the effects associated with bunching mechanisms leading to the growth of the instability itself. In addition, considerations on the threshold of the instability are also developed

  4. Use of Formal Procedures in Developing Dialogue Between Operator and Regulator on Radioactive Waste Disposal

    International Nuclear Information System (INIS)

    Yearsley, Roger; Duerden, Susan; Bennett, David

    2001-01-01

    The Environment Agency (the Agency) is responsible, in England and Wales, for authorisation of radioactive waste disposal under the Radioactive Substances Act 1993. British Nuclear Fuels plc (BNFL) is currently authorised to dispose of solid low level radioactive waste at its Drigg site near Sellafield in Cumbria. Drigg is the primary site for the disposal of solid low level radioactive waste generated by the UK nuclear industry. A small facility operated by United Kingdom Atomic Energy Authority (UKAEA) at Dounreay on the north coast of Scotland is used solely for wastes arising on the UKAEA site. Drigg also offers a disposal route for smaller users of radioactive substances, such as hospitals and universities. Significant benefits have been derived from implementing a formal Issue Resolution Procedure as part of a soundly based process for dialogue between the Agency and BNFL. Benefits include improved understanding of the Agency's expectations, which has in turn led to improvements in BNFL's documentation and technical approach. The Agency considers the use of a formal Issue Resolution Procedure has placed the dialogue with BNFL on firm foundations for the planned assessment of the PostClosure Safety Case for Drigg when it is submitted in September 2002

  5. Enhanced Oceanic Operations Human-In-The-Loop In-Trail Procedure Validation Simulation Study

    Science.gov (United States)

    Murdoch, Jennifer L.; Bussink, Frank J. L.; Chamberlain, James P.; Chartrand, Ryan C.; Palmer, Michael T.; Palmer, Susan O.

    2008-01-01

    The Enhanced Oceanic Operations Human-In-The-Loop In-Trail Procedure (ITP) Validation Simulation Study investigated the viability of an ITP designed to enable oceanic flight level changes that would not otherwise be possible. Twelve commercial airline pilots with current oceanic experience flew a series of simulated scenarios involving either standard or ITP flight level change maneuvers and provided subjective workload ratings, assessments of ITP validity and acceptability, and objective performance measures associated with the appropriate selection, request, and execution of ITP flight level change maneuvers. In the majority of scenarios, subject pilots correctly assessed the traffic situation, selected an appropriate response (i.e., either a standard flight level change request, an ITP request, or no request), and executed their selected flight level change procedure, if any, without error. Workload ratings for ITP maneuvers were acceptable and not substantially higher than for standard flight level change maneuvers, and, for the majority of scenarios and subject pilots, subjective acceptability ratings and comments for ITP were generally high and positive. Qualitatively, the ITP was found to be valid and acceptable. However, the error rates for ITP maneuvers were higher than for standard flight level changes, and these errors may have design implications for both the ITP and the study's prototype traffic display. These errors and their implications are discussed.

  6. Coded Splitting Tree Protocols

    DEFF Research Database (Denmark)

    Sørensen, Jesper Hemming; Stefanovic, Cedomir; Popovski, Petar

    2013-01-01

    This paper presents a novel approach to multiple access control called coded splitting tree protocol. The approach builds on the known tree splitting protocols, code structure and successive interference cancellation (SIC). Several instances of the tree splitting protocol are initiated, each...... instance is terminated prematurely and subsequently iterated. The combined set of leaves from all the tree instances can then be viewed as a graph code, which is decodable using belief propagation. The main design problem is determining the order of splitting, which enables successful decoding as early...

  7. A standard operating procedure for the surgical implantation of transmitters in juvenile salmonids

    Science.gov (United States)

    Liedtke, T.L.; Beeman, J.W.; Gee, L.P.

    2012-01-01

    Biotelemetry is a useful tool to monitor the movements of animals and is widely applied in fisheries research. Radio or acoustic technology can be used, depending on the study design and the environmental conditions in the study area. A broad definition of telemetry also includes the use of Passive Integrated Transponder (PIT) tags, either separately or with a radio or acoustic transmitter. To use telemetry, fish must be equipped with a transmitter. Although there are several attachment procedures available, surgical implantation of transmitters in the abdominal cavity is recognized as the best technique for long-term telemetry studies in general (Stasko and Pincock, 1977; Winter, 1996; Jepsen, 2003), and specifically for juvenile salmonids, Oncorhynchus spp. (Adams and others, 1998a, 1998b; Martinelli and others, 1998; Hall and others, 2009). Studies that use telemetry assume that the processes by which the animals are captured, handled, and tagged, as well as the act of carrying the transmitter, will have minimal effect on their behavior and performance. This assumption, commonly stated as a lack of transmitter effects, must be valid if telemetry studies are to describe accurately the movements and behavior of an entire population of interest, rather than the subset of that population that carries transmitters. This document describes a standard operating procedure (SOP) for surgical implantation of radio or acoustic transmitters in juvenile salmonids. The procedures were developed from a broad base of published information, laboratory experiments, and practical experience in tagging thousands of fish for numerous studies of juvenile salmon movements near Columbia River and Snake River hydroelectric dams. Staff from the Western Fisheries Research Center's Columbia River Research Laboratory (CRRL) frequently have used telemetry studies to evaluate new structures or operations at hydroelectric dams in the Columbia River Basin, and these evaluations typically

  8. Development and operation of a quality assurance system for deviations from standard operating procedures in a clinical cell therapy laboratory.

    Science.gov (United States)

    McKenna, D; Kadidlo, D; Sumstad, D; McCullough, J

    2003-01-01

    Errors and accidents, or deviations from standard operating procedures, other policy, or regulations must be documented and reviewed, with corrective actions taken to assure quality performance in a cellular therapy laboratory. Though expectations and guidance for deviation management exist, a description of the framework for the development of such a program is lacking in the literature. Here we describe our deviation management program, which uses a Microsoft Access database and Microsoft Excel to analyze deviations and notable events, facilitating quality assurance (QA) functions and ongoing process improvement. Data is stored in a Microsoft Access database with an assignment to one of six deviation type categories. Deviation events are evaluated for potential impact on patient and product, and impact scores for each are determined using a 0- 4 grading scale. An immediate investigation occurs, and corrective actions are taken to prevent future similar events from taking place. Additionally, deviation data is collectively analyzed on a quarterly basis using Microsoft Excel, to identify recurring events or developing trends. Between January 1, 2001 and December 31, 2001 over 2500 products were processed at our laboratory. During this time period, 335 deviations and notable events occurred, affecting 385 products and/or patients. Deviations within the 'technical error' category were most common (37%). Thirteen percent of deviations had a patient and/or a product impact score > or = 2, a score indicating, at a minimum, potentially affected patient outcome or moderate effect upon product quality. Real-time analysis and quarterly review of deviations using our deviation management program allows for identification and correction of deviations. Monitoring of deviation trends allows for process improvement and overall successful functioning of the QA program in the cell therapy laboratory. Our deviation management program could serve as a model for other laboratories in

  9. An operative gamma camera for sentinel lymph node procedure in case of breast cancer

    CERN Document Server

    Salvador, S; Mathelin, C; Guyonne, J; Huss, D

    2007-01-01

    Large field of view gamma cameras are widely used to perform lymphoscintigraphy in the sentinel lymph nodes (SLN) procedure in case of breast cancer. However, they are not specified for this application and their sizes do not enable their use in the operative room to control the excision of the all SLN. We present the results obtained with a prototype of a new mini gamma camera developed especially for the operative lymphoscintigraphy of the axillary area in case of breast cancer. This prototype is composed of 10 mm thick parallel lead collimator, a 2 mm thick GSO:Ce inorganic scintillating crystal from Hitachi and a Hamamatsu H8500 flat panel multianode (64 channels) photomultiplier tube (MAPMT) equipped with a dedicated electronics. Its actual field of view is 50 × 50mm2. The gamma interaction position in the GSO scintillating plate is obtained by calculating the center of gravity of the fired MAPMT channels. The measurements performed with this prototype demonstrate the usefulness of this mini gamma camer...

  10. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  11. Automation of cellular therapy product manufacturing: results of a split validation comparing CD34 selection of peripheral blood stem cell apheresis product with a semi-manual vs. an automatic procedure.

    Science.gov (United States)

    Hümmer, Christiane; Poppe, Carolin; Bunos, Milica; Stock, Belinda; Wingenfeld, Eva; Huppert, Volker; Stuth, Juliane; Reck, Kristina; Essl, Mike; Seifried, Erhard; Bonig, Halvard

    2016-03-16

    Automation of cell therapy manufacturing promises higher productivity of cell factories, more economical use of highly-trained (and costly) manufacturing staff, facilitation of processes requiring manufacturing steps at inconvenient hours, improved consistency of processing steps and other benefits. One of the most broadly disseminated engineered cell therapy products is immunomagnetically selected CD34+ hematopoietic "stem" cells (HSCs). As the clinical GMP-compliant automat CliniMACS Prodigy is being programmed to perform ever more complex sequential manufacturing steps, we developed a CD34+ selection module for comparison with the standard semi-automatic CD34 "normal scale" selection process on CliniMACS Plus, applicable for 600 × 10(6) target cells out of 60 × 10(9) total cells. Three split-validation processings with healthy donor G-CSF-mobilized apheresis products were performed; feasibility, time consumption and product quality were assessed. All processes proceeded uneventfully. Prodigy runs took about 1 h longer than CliniMACS Plus runs, albeit with markedly less hands-on operator time and therefore also suitable for less experienced operators. Recovery of target cells was the same for both technologies. Although impurities, specifically T- and B-cells, were 5 ± 1.6-fold and 4 ± 0.4-fold higher in the Prodigy products (p = ns and p = 0.013 for T and B cell depletion, respectively), T cell contents per kg of a virtual recipient receiving 4 × 10(6) CD34+ cells/kg was below 10 × 10(3)/kg even in the worst Prodigy product and thus more than fivefold below the specification of CD34+ selected mismatched-donor stem cell products. The products' theoretical clinical usability is thus confirmed. This split validation exercise of a relatively short and simple process exemplifies the potential of automatic cell manufacturing. Automation will further gain in attractiveness when applied to more complex processes, requiring frequent interventions or handling at

  12. 30 CFR 761.15 - Procedures for waiving the prohibition on surface coal mining operations within the buffer zone...

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Procedures for waiving the prohibition on surface coal mining operations within the buffer zone of an occupied dwelling. 761.15 Section 761.15... surface coal mining operations within the buffer zone of an occupied dwelling. (a) This section does not...

  13. Towards Large Volume Big Divisor D3-D7 "mu-Split Supersymmetry" and Ricci-Flat Swiss-Cheese Metrics, and Dimension-Six Neutrino Mass Operators

    CERN Document Server

    Dhuria, Mansi

    2012-01-01

    We show that it is possible to realize a "mu-split SUSY" scenario [1] in the context of large volume limit of type IIB compactifications on Swiss-Cheese Calabi-Yau's in the presence of a mobile space-time filling D3-brane and a (stack of) D7-brane(s) wrapping the "big" divisor Sigma_B. For this, we investigate the possibility of getting one Higgs to be light while other to be heavy in addition to a heavy Higgsino mass parameter. Further, we examine the existence of long lived gluino that manifests one of the major consequences of mu-split SUSY scenario, by computing its decay width as well as lifetime corresponding to the 3-body decays of the gluino into a quark, a squark and a neutralino or Goldstino, as well as 2-body decays of the gluino into either a neutralino or a Goldstino and a gluon. Guided by the geometric Kaehler potential for Sigma_B obtained in [2] based on GLSM techniques, and the Donaldson's algorithm [3] for obtaining numerically a Ricci-flat metric, we give details of our calculation in [4] p...

  14. Conditional Monthly Weather Resampling Procedure for Operational Seasonal Water Resources Forecasting

    Science.gov (United States)

    Beckers, J.; Weerts, A.; Tijdeman, E.; Welles, E.; McManamon, A.

    2013-12-01

    To provide reliable and accurate seasonal streamflow forecasts for water resources management several operational hydrologic agencies and hydropower companies around the world use the Extended Streamflow Prediction (ESP) procedure. The ESP in its original implementation does not accommodate for any additional information that the forecaster may have about expected deviations from climatology in the near future. Several attempts have been conducted to improve the skill of the ESP forecast, especially for areas which are affected by teleconnetions (e,g. ENSO, PDO) via selection (Hamlet and Lettenmaier, 1999) or weighting schemes (Werner et al., 2004; Wood and Lettenmaier, 2006; Najafi et al., 2012). A disadvantage of such schemes is that they lead to a reduction of the signal to noise ratio of the probabilistic forecast. To overcome this, we propose a resampling method conditional on climate indices to generate meteorological time series to be used in the ESP. The method can be used to generate a large number of meteorological ensemble members in order to improve the statistical properties of the ensemble. The effectiveness of the method was demonstrated in a real-time operational hydrologic seasonal forecasts system for the Columbia River basin operated by the Bonneville Power Administration. The forecast skill of the k-nn resampler was tested against the original ESP for three basins at the long-range seasonal time scale. The BSS and CRPSS were used to compare the results to those of the original ESP method. Positive forecast skill scores were found for the resampler method conditioned on different indices for the prediction of spring peak flows in the Dworshak and Hungry Horse basin. For the Libby Dam basin however, no improvement of skill was found. The proposed resampling method is a promising practical approach that can add skill to ESP forecasts at the seasonal time scale. Further improvement is possible by fine tuning the method and selecting the most

  15. The use of operator surveys by the CEGB to evaluate nuclear control room design and initiatives in the design of alarm systems and control room operating procedures

    International Nuclear Information System (INIS)

    Jackson, A.R.G.

    1988-01-01

    This paper reports on the use of operator surveys and trip report analysis methods which the Central Electricity Generating Board has developed to assess the extent and adequacy of operator support systems currently installed on its four twin-reactor, first generation Advanced Gas Cooled Reactor nuclear power plants. The survey consisted of a programme of structured interviews with control room engineers. The scope of the questions addressed; working environment, communications, man-machine interface, procedural information, and the diagnostic and predictive support system. The analysis of trip reports was targetted at identifying aspects of the performance of the operator support systems which might have been contributory to the cause of reactor trip. The results of this work are being used to assist in determining guidelines for the development of operator support systems, computerised controls and the structure of station operating procedures

  16. Standard Operating Procedure (SOP) for Rapid and Efficient Production of Stevia Tissue Culture Seedlings

    International Nuclear Information System (INIS)

    Norazlina Noordin; Peng, C.S.; Rusli Ibrahim

    2015-01-01

    Stevia rebaudiana Bertoni is a non-caloric natural sweetener which is 300 times sweeter than cane sugar. Extracts from stevia leaves has vast application in food and beverages based industries, can be added to tea and coffee, cooked or baked goods, processed foods and confectionary goods. Recently, stevia attained awareness owing to its natural, non-caloric sweetness by diet/ health conscious and diabetic persons (Arpita et al., 2011). This natural sweetener has high commercial value in global market, it was estimated that global market value for stevia is be around USD11 billion by year 2015. Although stevia is being largely popularized in Malaysia and other countries but large-scale propagation procedures for the continuous supply of planting materials in commercial plantation has yet to be established, optimized and standardized. Furthermore, propagation through stevia seeds is often very difficult due to self-incompatibility which results in sterile seeds (Sakaguchi et al., 1982). Tissue culture is the only rapid process for the mass propagation of stevia and there have been few reports of in vitro growth of stevia (Miyagaya et al., 1986) and in vitro micropropagation from shoot tip and leaf (Uddin et al., 2006). Hence, study was carried out to establish a suitable protocol for in vitro propagation of S. rebaudiana Bertoni that can be further up-scaled for mass propagation of stevia seedlings. The established Standard Operating Procedure (SOP) will ensure rapid and efficient production of stevia tissue culture seedlings for continuous supply of planting materials for commercial stevia plantations in Malaysia. Preparation of growth medium, multiplication of shoots, rooting of plant lets and hardening of ex-vitro rooted plant lets is discussed in this paper. (author)

  17. On geometrical splitting in nonanalog Monte Carlo

    International Nuclear Information System (INIS)

    Lux, I.

    1985-01-01

    A very general geometrical procedure is considered, and it is shown how the free flights, the statistical weights and the contribution of particles participating in splitting are to be chosen in order to reach unbiased estimates in games where the transition kernels are nonanalog. Equations governing the second moment of the score and the number of flights to be stimulated are derived. It is shown that the post-splitting weights of the fragments are to be chosen equal to reach maximum gain in variance. Conditions are derived under which the expected number of flights remains finite. Simplified example illustrate the optimization of the procedure (author)

  18. Risk and safety of pediatric sedation/anesthesia for procedures outside the operating room.

    Science.gov (United States)

    Cravero, Joseph P

    2009-08-01

    Sedation and anesthesia outside the operating room represents a rapidly growing field of practice that involves a number of different specialty providers including anesthesiology. The literature surrounding this work is found in a variety of journals - many outside anesthesiology. This review is intended to inform readers about the current status of risk and safety involving sedation/anesthesia for tests and minor procedures utilizing a wide range of sources. Two large database studies have helped to define the frequency and nature of adverse events in pediatric sedation/anesthesia practice from a multispecialty perspective. A number of papers describing respiratory and hemodynamic aspects of dexmedetomidine sedation have also been published. Finally, a number of studies relating to training sedation providers, reporting of sedation adverse events, sedation for vulnerable populations, and (in particular) ketamine sedation adverse respiratory events have also come to light. The latest publications continue to document a relatively low risk to pediatric sedation yet also warn us about the potential adverse events in this field. The results help to define competencies required to deliver pediatric sedation and make this practice even safer. Particularly interesting are new jargon and methodologies for defining adverse events and the use of new methods for training sedation providers.

  19. Qualitative research within trials: developing a standard operating procedure for a clinical trials unit

    Science.gov (United States)

    2013-01-01

    Background Qualitative research methods are increasingly used within clinical trials to address broader research questions than can be addressed by quantitative methods alone. These methods enable health professionals, service users, and other stakeholders to contribute their views and experiences to evaluation of healthcare treatments, interventions, or policies, and influence the design of trials. Qualitative data often contribute information that is better able to reform policy or influence design. Methods Health services researchers, including trialists, clinicians, and qualitative researchers, worked collaboratively to develop a comprehensive portfolio of standard operating procedures (SOPs) for the West Wales Organisation for Rigorous Trials in Health (WWORTH), a clinical trials unit (CTU) at Swansea University, which has recently achieved registration with the UK Clinical Research Collaboration (UKCRC). Although the UKCRC requires a total of 25 SOPs from registered CTUs, WWORTH chose to add an additional qualitative-methods SOP (QM-SOP). Results The qualitative methods SOP (QM-SOP) defines good practice in designing and implementing qualitative components of trials, while allowing flexibility of approach and method. Its basic principles are that: qualitative researchers should be contributors from the start of trials with qualitative potential; the qualitative component should have clear aims; and the main study publication should report on the qualitative component. Conclusions We recommend that CTUs consider developing a QM-SOP to enhance the conduct of quantitative trials by adding qualitative data and analysis. We judge that this improves the value of quantitative trials, and contributes to the future development of multi-method trials. PMID:23433341

  20. Manual of Standard Operating Procedures for Veterinary Drug Residue Analysis (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    Laboratories are crucial to national veterinary drug residue monitoring programmes. However, one of the main challenges laboratories encounter is obtaining access to relevant methods of analysis. Thus, in addition to training, providing technical advice and transferring technology, the Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture has resolved to develop clear and practical manuals to support Member State laboratories. The Coordinated Research Project (CRP) on Development of Radiometric and Allied Analytical Methods to Strengthen Residue Control Programs for Antibiotic and Anthelmintic Veterinary Drug Residues has developed a number of analytical methods as standard operating procedures (SOPs), which are now compiled here. This publication contains SOPs on chromatographic and spectrometric techniques, as well as radioimmunoassay and associated screening techniques, for various anthelmintic and antimicrobial veterinary drug residue analysis. Some analytical method validation protocols are also included. The publication is primarily aimed at food and environmental safety laboratories involved in testing veterinary drug residues, including under organized national residue monitoring programmes. It is expected to enhance laboratory capacity building and competence through the use of radiometric and complementary tools and techniques. The publication is also relevant for applied research on residues of veterinary drugs in food and environmental samples

  1. Development of a standard operating procedure for mammography equipment used in calibration of ionized chambers

    International Nuclear Information System (INIS)

    Rodrigues, Yklys Santos; Potiens, Maria da Penha Albuquerque

    2011-01-01

    Mammography is one widely used technique in the detection of breast cancer. In order to optimize the results achieving better images with lower dose rates, a quality assurance programme must be applied to the equipment. Some control tests use ionization chambers to measure air kerma and other quantities. These tests can only be reliable if the ionization chambers used on them are correctly calibrated. In the present work, it was developed a standard operating procedure (SOP) for quality control tests in a commercial mammography equipment installed in the Calibration Laboratory (LCI) at IPEN - Brazilian Institute for energy and nuclear research). Seven tests were performed in the equipment: Tube voltage and exposition time accuracy and reproducibility, linearity and reproducibility of Air kerma and Half Value Layer (HVL). Then, it was made a measurement of the air kerma in the mammography equipment, using a reference ionization chamber with traceability to a primary laboratory in Germany (Physikalisch-Technische Bundesanstalt - PTB), that was later compared with the air kerma measured in an industrial irradiator. This industrial X-ray generator was recently used in the implementation of X-radiation Standards beams, mammography level, following the Standard IEC 61267. The HVL values varied from 0.36 (25kV) to 0.41 mmA1 (35kV), and the measured air kerma rates were between 9.78 and 17.97 mGy/min. (author)

  2. VAS operational procedures and results at the Kansas City Satellite Field Services Station

    Science.gov (United States)

    Heckman, B.; Carle, W.; Anthony, R.

    1983-01-01

    An operational assessment of VAS data by using a Man-computer Interactive Data Access System (McIDAS) terminal linked by a 9600 band telephone line is discussed. Seven hours of VAS data were processed and edited daily. Data was scheduled 16 hours a day, 7 days a week; however, during this time period there were very few days with 16 hours of data to evalute. The McIDAS terminal, which has 10 display frames and 5 graphics, provide access to the sounding data processed. These data are processed using two procedures. The dwell sounding data are generated by using all 12 spectral channels with a spin budget of 39. To provide coverage for most of the United States, soundings are made starting at 18 minutes after the hour from approximately 49 deg N to 36 deg N and at 48 minutes after the hour from 36 deg N to 26 deg N. The dwell imaging mode uses 11 channels but the spin budge is 17. With the reduced spin budget, retrievals can be made at 18 or 48 minutes after the hour for approximately 44 deg N to 27 deg N. With these constraints a schedule, of data sets was proposed to use the schedule and how the data set could be used are shown.

  3. Acceptance/operational test procedure 241-AN-107 Video Camera System

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1994-01-01

    This procedure will document the satisfactory operation of the 241-AN-107 Video Camera System. The camera assembly, including camera mast, pan-and-tilt unit, camera, and lights, will be installed in Tank 241-AN-107 to monitor activities during the Caustic Addition Project. The camera focus, zoom, and iris remote controls will be functionally tested. The resolution and color rendition of the camera will be verified using standard reference charts. The pan-and-tilt unit will be tested for required ranges of motion, and the camera lights will be functionally tested. The master control station equipment, including the monitor, VCRs, printer, character generator, and video micrometer will be set up and performance tested in accordance with original equipment manufacturer's specifications. The accuracy of the video micrometer to measure objects in the range of 0.25 inches to 67 inches will be verified. The gas drying distribution system will be tested to ensure that a drying gas can be flowed over the camera and lens in the event that condensation forms on these components. This test will be performed by attaching the gas input connector, located in the upper junction box, to a pressurized gas supply and verifying that the check valve, located in the camera housing, opens to exhaust the compressed gas. The 241-AN-107 camera system will also be tested to assure acceptable resolution of the camera imaging components utilizing the camera system lights

  4. Standard operating procedures for quality audits of 60Co external beam radiotherapy facilities

    International Nuclear Information System (INIS)

    Larrinaga Cortina, E.F.; Dominguez Hung, L.; Campa Menendez, R.

    2001-01-01

    The use of radiotherapy implies the necessity of rigorous quality standards in its different components, aimed to provide the best possible treatment and avoid potential patients' risks, that could even cause him death. Projects of technical cooperation developed in Cuba and supported by the International Atomic Energy Agency address the implementation of Programs of Quality Assurance (PGC) in radiotherapy services. The establishment of the National Quality Audit Program (PNAC) is a superior stage. The National Control Center for Medical Devices, as the national regulator entity for the control and supervision of medical devices in the National Health System, is responsible for the making and execution of the PNAC. The audit modality selected was the inspection visit in situ due to its intrinsic advantages, our geographical extension and the number of radiotherapy services. This paper presents the methodology for the execution of the PNAC, in form of a Normalized Procedure of Operation (PNO) that defines the objectives, scope, terms and definitions, responsibilities, composition and selection of the auditor team, security's conditions, materials and equipment, steps of the audit execution, results calculation and interpretation, records, etc. (author)

  5. Manual of Standard Operating Procedures for Veterinary Drug Residue Analysis (French Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    Laboratories are crucial to national veterinary drug residue monitoring programmes. However, one of the main challenges laboratories encounter is obtaining access to relevant methods of analysis. Thus, in addition to training, providing technical advice and transferring technology, the Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture has resolved to develop clear and practical manuals to support Member State laboratories. The Coordinated Research Project (CRP) on Development of Radiometric and Allied Analytical Methods to Strengthen Residue Control Programs for Antibiotic and Anthelmintic Veterinary Drug Residues has developed a number of analytical methods as standard operating procedures (SOPs), which are now compiled here. This publication contains SOPs on chromatographic and spectrometric techniques, as well as radioimmunoassay and associated screening techniques, for various anthelmintic and antimicrobial veterinary drug residue analysis. Some analytical method validation protocols are also included. The publication is primarily aimed at food and environmental safety laboratories involved in testing veterinary drug residues, including under organized national residue monitoring programmes. It is expected to enhance laboratory capacity building and competence through the use of radiometric and complementary tools and techniques. The publication is also relevant for applied research on residues of veterinary drugs in food and environmental samples

  6. Consecutive operative procedures in patients with Marfan syndrome up to 28 years after initial aortic root surgery.

    Science.gov (United States)

    Puluca, Nazan; Burri, Melchior; Cleuziou, Julie; Krane, Markus; Lange, Rüdiger

    2018-02-28

    Most patients (75%) with Marfan syndrome present with aortic root dilatation that may require surgical intervention. However, associated cardiovascular disorders are not limited to the aortic root. These patients frequently require consecutive operations on the remaining thoracic aorta or the heart valves. Our intent was to characterize the spectrum of such procedures. Data from all patients with Marfan syndrome undergoing aortic root surgery at our centre between 1988 and 2016 were analysed retrospectively. Overall, 73 patients (26 women) were selected for the study. The median age at 1st operation was 30 years (3-68 years). Indications for aortic root surgery were aneurysm (78%) and dissection (22%). Initially, 33 Bentall procedures and 40 valve-sparing root replacement procedures were performed, with a 97% rate of follow-up completion. The median follow up was 8 years (0-28 years). Survival at 1, 10 and 15 years was 100%, 85% and 82%, respectively. During follow-up monitoring, 48 subsequent procedures were performed in 33 patients (aorta, 23; aortic valve, 11; mitral valve, 7 and combined procedures, 7). The 30-day mortality rate after subsequent procedures was 4.2%. Freedom from subsequent operation and death (combined end-point) after 5, 10 and 15 years was 70%, 53% and 34%, respectively. After the initial surgery, subsequent procedures required in the setting of Marfan syndrome most often involve the remaining native aorta, followed by the aortic and mitral valves. The continued need for additional operative procedures remains high, even decades after the initial surgeries are undertaken. Therefore, long-term patient monitoring at specialized centres is imperative.

  7. Authorization procedure for the construction and operation of nuclear installations within the EC Member States, including supervision and control

    International Nuclear Information System (INIS)

    Amaducci, Sandro; Didier, J.M.

    1978-01-01

    This report is an updating of the report EUR 5284, Authorization procedure for the construction and operation of nuclear installations within the EEC Member States, prepared in 1974 by J.M. Didier and Associates. Recent developments regarding the authorization procedure for the construction and operation of nuclear installations have taken place in Italy (introduction of a site approval procedure) and in Denmark (adoption of an overall legislation on the subject, however not yet in force). With respect to supervision and control of nuclear installations during construction and operation, competences of, as well as their exercise by, supervisory authorities in all EC Member States, with the exception of Ireland, are also analysed in the current study

  8. Improvement of Safety Features in Standard Operation Procedure of Tc-99m Generator

    International Nuclear Information System (INIS)

    Manisah Saedon; Mohd Khairul Hakimi; Shyen, A.K.S.

    2011-01-01

    This paper describes the improvements proposed to the original production procedures for Tc-99m generators. Improvements are intended to add safety and health features for workers into the existing procedures. The difference between the new safe work procedures from the original work procedures; is the concern about the safety and health of employees other than the product safety. One of the suggested safety characteristics is by using the visual aid so that the workers can easily see and read the procedures when they perform their duties, whereas the previous procedures are kept in the manual and difficult to access. The purpose of this paper is to share information about the importance of safety and health features for the workers in the procedures established in addition to provide awareness to all parties involved. (author)

  9. Market Structure and Stock Splits

    OpenAIRE

    David Michayluk; Paul Kofman

    2001-01-01

    Enhanced liquidity is one possible motivation for stock splits but empirical research frequently documents declines in liquidity following stock splits. Despite almost thirty years of inquiry, little is known about all the changes in a stock's trading activity following a stock split. We examine how liquidity measures change around more than 2,500 stock splits and find a pervasive decline in most measures. Large stock splits exhibit a more severe liquidity decline than small stock splits, esp...

  10. Emergency operating procedures improvement based on the lesson learned from the Fukushima Daiichi accident

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Wen-Hsiung, E-mail: whwu1127@aec.gov.tw [Atomic Energy Council, 2F., No. 80, Sec.1, Chenggong Rd., Yonghe Dist., New Taipei City 234, Taiwan (China); Institute of Nuclear Engineering and Science, National Tsing Hua University, No. 101, Sec. 2, Guangfu Rd., Hsinchu City 300, Taiwan (China); Liao, Lih-Yih, E-mail: lyliao@iner.gov.tw [Institute of Nuclear Energy Research, Atomic Energy Council, No. 1000, Wenhua Rd., Jiaan Village, Longtan Township, Taoyuan County 325, Taiwan (China)

    2016-12-01

    Highlights: • Discuss the problem of EOPs at the time of Fukushima accident to deal with the prolonged SBO. • Elaborate the potential risk accompanied with the emergency depressurization in the SBO. • Describe a special guideline to cope with Fukushima-like accidents and provide its technical basis. • Point out that Fukushima accident might have been prevented if improved EOPs had been used. • Propose key points and suggestions for improving the EOPs. - Abstract: One of the lessons learned from the Fukushima Daiichi accident is the emergency operating procedures (EOPs) have to be improved. The BWR Owners’ Group revised the emergency procedure guidelines and addressed the lesson learned from the Fukushima Daiichi accident in revision 3 in order to avoid loss of turbine-driven makeup water systems during reactor depressurization. However, the improvement deserves much more attention. The existing EOPs at the time of the accident may not be adequate enough for the prolonged station blackout condition, because resources required for performing the EOPs are vastly unavailable or gradually exhausted. The improved EOPs must not only permit early reactor pressure vessel depressurization, but also address the risk accompanied with the emergency depressurization. For this reason, Taiwan Power Company proposed the Ultimate Response Guideline (URG) to cope with Fukushima-like accidents. The main content of the URG is a two-stage depressurization strategy, namely the controlled depressurization and the emergency depressurization. The technical basis of the two-stage depressurization strategy was discussed in this paper. The effectiveness of the URG was verified by using TRAC/RELAP Advanced Computational Engine (TRACE). Besides, the emergency responses performed by Fukushima Daini nuclear power plant (Fukushima Daini NPP) were found to be very similar to the URG. The consequences of Fukushima Daini NPP somehow demonstrate that the URG is effective for Fukushima

  11. Emergency operating procedures improvement based on the lesson learned from the Fukushima Daiichi accident

    International Nuclear Information System (INIS)

    Wu, Wen-Hsiung; Liao, Lih-Yih

    2016-01-01

    Highlights: • Discuss the problem of EOPs at the time of Fukushima accident to deal with the prolonged SBO. • Elaborate the potential risk accompanied with the emergency depressurization in the SBO. • Describe a special guideline to cope with Fukushima-like accidents and provide its technical basis. • Point out that Fukushima accident might have been prevented if improved EOPs had been used. • Propose key points and suggestions for improving the EOPs. - Abstract: One of the lessons learned from the Fukushima Daiichi accident is the emergency operating procedures (EOPs) have to be improved. The BWR Owners’ Group revised the emergency procedure guidelines and addressed the lesson learned from the Fukushima Daiichi accident in revision 3 in order to avoid loss of turbine-driven makeup water systems during reactor depressurization. However, the improvement deserves much more attention. The existing EOPs at the time of the accident may not be adequate enough for the prolonged station blackout condition, because resources required for performing the EOPs are vastly unavailable or gradually exhausted. The improved EOPs must not only permit early reactor pressure vessel depressurization, but also address the risk accompanied with the emergency depressurization. For this reason, Taiwan Power Company proposed the Ultimate Response Guideline (URG) to cope with Fukushima-like accidents. The main content of the URG is a two-stage depressurization strategy, namely the controlled depressurization and the emergency depressurization. The technical basis of the two-stage depressurization strategy was discussed in this paper. The effectiveness of the URG was verified by using TRAC/RELAP Advanced Computational Engine (TRACE). Besides, the emergency responses performed by Fukushima Daini nuclear power plant (Fukushima Daini NPP) were found to be very similar to the URG. The consequences of Fukushima Daini NPP somehow demonstrate that the URG is effective for Fukushima

  12. Hazard and operability study (Haz Op) of the 2 MW IEA-R1 reactor startup procedures

    International Nuclear Information System (INIS)

    Sauer, Maria E.L.J.; Correa, Francisco; Sara Neto, Antonio J.; Costa, Carlos A.R. da; Santos, Cilas C. dos; Cardenas, Jose P.N.; Berretta, Jose R.; Neves Conti, Thadeu das

    1997-01-01

    This work presents the Hazard and Operability Study (Haz Op) applied to startup procedures of the 2 MW IEA-R1 research reactor, at IPEN/CNEN-S P. The Haz Op was developed by reviewing the procedures of the installation startup, in order to identify hazards and/or operational problems caused by deviations in the execution of these routines. This paper summarizes this study. describing some potential problems of relevant importance to safety as well as preventives and/or correctives measures to avoid their occurrence. Besides, an benefits evaluation and the technique limitations is made. (author). 5 refs., 1 tab

  13. Concentric Split Flow Filter

    Science.gov (United States)

    Stapleton, Thomas J. (Inventor)

    2015-01-01

    A concentric split flow filter may be configured to remove odor and/or bacteria from pumped air used to collect urine and fecal waste products. For instance, filter may be designed to effectively fill the volume that was previously considered wasted surrounding the transport tube of a waste management system. The concentric split flow filter may be configured to split the air flow, with substantially half of the air flow to be treated traveling through a first bed of filter media and substantially the other half of the air flow to be treated traveling through the second bed of filter media. This split flow design reduces the air velocity by 50%. In this way, the pressure drop of filter may be reduced by as much as a factor of 4 as compare to the conventional design.

  14. Predictors of Post-Operative Pain Relief in Patients with Chronic Pancreatitis Undergoing the Frey or Whipple Procedure.

    Science.gov (United States)

    Sinha, Amitasha; Patel, Yuval A; Cruise, Michael; Matsukuma, Karen; Zaheer, Atif; Afghani, Elham; Yadav, Dhiraj; Makary, Martin A; Hirose, Kenzo; Andersen, Dana K; Singh, Vikesh K

    2016-04-01

    Post-operative pain relief in chronic pancreatitis (CP) is variable. Our objective was to determine clinical imaging or histopathologic predictor(s) of post-operative pain relief in CP patients undergoing the Whipple or Frey procedure. All patients who underwent a Whipple (n = 30) or Frey procedure (n = 30) for painful CP between January 2003 and September 2013 were evaluated. A toxic etiology was defined as a history of alcohol use and/or smoking. The pre-operative abdominal CT was evaluated for calcification(s) and main pancreatic duct (MPD) dilation (≥5 mm). The post-operative histopathology was evaluated for severe fibrosis. Clinical imaging and histopathologic features were evaluated as predictors of post-operative pain relief using univariable and multivariable regression analysis. A total of 60 patients (age 51.6 years, 53% males) were included in our study, of whom 42 (70%) reported post-operative pain relief over a mean follow-up of 1.1 years. There were 37 (62%) patients with toxic etiology, 36 (60%) each with calcification(s) and MPD dilation. A toxic etiology, calcifications, and severe fibrosis were associated with post-operative pain relief on univariable analysis (all p Whipple or Frey procedure.

  15. Development of Small UAS Beyond-Visual-Line-of-Sight (BVLOS Flight Operations: System Requirements and Procedures

    Directory of Open Access Journals (Sweden)

    Scott Xiang Fang

    2018-04-01

    Full Text Available Due to safety concerns of integrating small unmanned aircraft systems (UAS into non-segregated airspace, aviation authorities have required a set of detect and avoid (DAA systems to be equipped on small UAS for beyond-visual-line-of-sight (BVLOS flight operations in civil airspace. However, the development of small UAS DAA systems also requires BVLOS flights for testing and validation. To mitigate operational risks for small UAS BVLOS flight operations, this paper proposes to initially test small UAS DAA systems in BVLOS flights in a restricted airspace with additional safety features. Later, this paper further discusses the operating procedures and emergency action plans for small UAS BVLOS flight operations. The testing results show that these safety systems developed can help improve operational safety for small UAS BVLOS flight operations.

  16. Split Malcev algebras

    Indian Academy of Sciences (India)

    project of the Spanish Ministerio de Educación y Ciencia MTM2007-60333. References. [1] Calderón A J, On split Lie algebras with symmetric root systems, Proc. Indian. Acad. Sci (Math. Sci.) 118(2008) 351–356. [2] Calderón A J, On split Lie triple systems, Proc. Indian. Acad. Sci (Math. Sci.) 119(2009). 165–177.

  17. Stochastic split determinant algorithms

    International Nuclear Information System (INIS)

    Horvatha, Ivan

    2000-01-01

    I propose a large class of stochastic Markov processes associated with probability distributions analogous to that of lattice gauge theory with dynamical fermions. The construction incorporates the idea of approximate spectral split of the determinant through local loop action, and the idea of treating the infrared part of the split through explicit diagonalizations. I suggest that exact algorithms of practical relevance might be based on Markov processes so constructed

  18. Impact of operator on determining functional parameters of nuclear medicine procedures.

    Science.gov (United States)

    Mohammed, A M; Naddaf, S Y; Mahdi, F S; Al-Mutawa, Q I; Al-Dossary, H A; Elgazzar, A H

    2006-01-01

    The study was designed to assess the significance of the interoperator variability in the estimation of functional parameters for four nuclear medicine procedures. Three nuclear medicine technologists with varying years of experience processed the following randomly selected 20 cases with diverse functions of each study type: renography, renal cortical scans, myocardial perfusion gated single-photon emission computed tomography (MP-GSPECT) and gated blood pool ventriculography (GBPV). The technologists used the same standard processing routines and were blinded to the results of each other. The means of the values and the means of differences calculated case by case were statistically analyzed by one-way ANOVA. The values were further analyzed using Pearson correlation. The range of the mean values and standard deviation of relative renal function obtained by the three technologists were 50.65 +/- 3.9 to 50.92 +/- 4.4% for renography, 51.43 +/- 8.4 to 51.55 +/- 8.8% for renal cortical scans, 57.40 +/- 14.3 to 58.30 +/- 14.9% for left ventricular ejection fraction from MP-GSPECT and 54.80 +/- 12.8 to 55.10 +/- 13.1% for GBPV. The difference was not statistically significant, p > 0.9. The values showed a high correlation of more than 0.95. Calculated case by case, the mean of differences +/- SD was found to range from 0.42 +/- 0.36% in renal cortical scans to 1.35 +/- 0.87% in MP-GSPECT with a maximum difference of 4.00%. The difference was not statistically significant, p > 0.19. The estimated functional parameters were reproducible and operator independent as long as the standard processing instructions were followed. Copyright 2006 S. Karger AG, Basel.

  19. 49 CFR 192.605 - Procedural manual for operations, maintenance, and emergencies.

    Science.gov (United States)

    2010-10-01

    ... operation of pressure-limiting and control devices. (6) Maintaining compressor stations, including... operations of a pipeline system commence. Appropriate parts of the manual must be kept at locations where..., operating and shutting down gas compressor units. (8) Periodically reviewing the work done by operator...

  20. A Procedure for Building Product Models in Intelligent Agent-based OperationsManagement

    DEFF Research Database (Denmark)

    Hvam, Lars; Riis, Jesper; Malis, Martin

    2003-01-01

    This article presents a procedure for building product models to support the specification processes dealing with sales, design of product variants and production preparation. The procedure includes, as the first phase, an analysis and redesign of the business processes that are to be supported b...

  1. 47 CFR 25.255 - Procedures for resolving harmful interference related to operation of ancillary terrestrial...

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Procedures for resolving harmful interference... GHz bands. 25.255 Section 25.255 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Technical Standards § 25.255 Procedures for resolving...

  2. Impact of operator fatigue on endoscopy performance: implications for procedure scheduling.

    LENUS (Irish Health Repository)

    Harewood, Gavin C

    2009-08-01

    With increasing volumes of endoscopic procedures, endoscopists\\' workload has had to increase to meet this escalating demand. The aim of this study was to characterize the impact of endoscopist fatigue on quality of endoscopy performance by comparing outcomes based on chronological procedure order.

  3. "Split Cast Mounting: Review and New Technique".

    Science.gov (United States)

    Gundawar, S M; Pande, Neelam A; Jaiswal, Priti; Radke, U M

    2014-12-01

    For the fabrication of a prosthesis, the Prosthodontist meticulously performs all the steps. The laboratory technician then make every effort/strives to perform the remaining lab procedures. However when the processed dentures are remounted on the articulator, some changes are seen. These changes may be divided into two categories: Pre-insertion and post-insertion changes, which deal with the physical properties of the materials involved (Parker, J Prosthet Dent 31:335-342, 1974). Split cast mounting is the method of mounting casts on the articulator. It is essentially a maxillary cast constructed in two parts with a horizontal division. The procedure allows for the verification of the accuracy of the initial mounting and the ease of removal and replacement of the cast. This provides a precise means of correcting the changes in occlusion occurring as a result of the processing technique (Nogueira et al., J Prosthet Dent 91:386-388, 2004). Instability of the split mounting has always been a problem to the Prosthodontist thereby limiting its use. There are various materials mentioned in the literature. The new technique by using Dowel pins and twill thread is very easy, cheaper and simple way to stabilize the split mounting. It is useful and easy in day to day laboratory procedures. The article presents different methods of split cast mounting and the new procedure using easily available materials in prosthetic laboratory.

  4. Forced splitting of fractions in CE

    NARCIS (Netherlands)

    Zalewski, D.R.; Schlautmann, Stefan; Gardeniers, Johannes G.E.

    2008-01-01

    In order to increase the electrophoretic separation between fractions of analytes on a microfluidic chip, without the need for a longer separation channel, we propose and demonstrate a preparative electrokinetic procedure by which overlapping or closely spaced fractions are automatically split. The

  5. A Guide for Developing Standard Operating Job Procedures for the Screening & Grinding Process Wastewater Treatment Facility. SOJP No. 1.

    Science.gov (United States)

    Deal, Gerald A.; Montgomery, James A.

    This guide describes standard operating job procedures for the screening and grinding process of wastewater treatment facilities. The objective of this process is the removal of coarse materials from the raw waste stream for the protection of subsequent equipment and processes. The guide gives step-by-step instructions for safety inspection,…

  6. 40 CFR 73.18 - Submittal procedures for units commencing commercial operation during the period from January 1...

    Science.gov (United States)

    2010-07-01

    ... commencing commercial operation during the period from January 1, 1993, through December 31, 1995. 73.18 Section 73.18 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Allowance Allocations § 73.18 Submittal procedures for units...

  7. Consultative Committee for Space Data Systems recommendation for space data system standards: Telecommand. Part 2.1: Command operation procedures

    Science.gov (United States)

    1991-01-01

    This recommendation contains the detailed specification of the logic required to carry out the Command Operations Procedures of the Transfer Layer. The Recommendation for Telecommand--Part 2, Data Routing Service contains the standard data structures and data communication procedures used by the intermediate telecommand system layers (the Transfer and Segmentation Layers). In particular, it contains a brief description of the Command Operations Procedures (COP) within the Transfer Layer. This recommendation contains the detailed definition of the COP's in the form of state tables, along with definitions of the terms used. It is assumed that the reader of this document is familiar with the data structures and terminology of part 2. In case of conflict between the description of the COP's in part 2 and in this recommendation, the definition in this recommendation will take precedence. In particular, this document supersedes section 4.3.3.1 through 4.3.3.4 of part 2.

  8. Standard Operating Procedures for PET/CT: A Practical Approach for Use in Adult Oncology

    International Nuclear Information System (INIS)

    2013-01-01

    of operating procedures for FDG-PET/CT imaging in adult oncology patients. The text is based on consensus and agreement among the authors, following a systematic approach of relying on personal experience and the available scientific evidence on all the subjects included. Due to the evolving nature of PET/CT imaging, which is a rapidly growing technology, this publication will undoubtedly need to be updated on a regular basis. It may well be that each PET/CT centre will have to modify the recommendations provided here to suit its own particular circumstances, according to, inter alia, the type of scanner, patient population, use of intravenous contrast, availability of FDG, professional staff experience, local regulations and preferences of referring physicians. The information provided here is felt to be important in the light of the growing need to standardize and optimize the way PET/CT scans are performed, not only to enable trials using FDG-PET/CT in different institutions to be compared and correlated, but also to allow for more accurate comparisons of scans performed on the same patient at different points in time at a single institution. This is important when assessing the response to cancer therapy, and especially so when this evaluation is performed early and after using novel targeted treatments that very often only produce changes in metabolic activity and not in lesion/tumour size. This is the reason why strictly following a correct imaging protocol is crucial. The reliability of the PET/CT imaging information in cancer patients depends on trustworthy and consistently applied protocols. This issue has current relevance in drug discovery and development, where PET/CT imaging with FDG and other radiotracers is viewed by the pharmaceutical industry as potentially useful for shortening the process of clinical validation of new drugs

  9. SURF: Taking Sustainable Remediation from Concept to Standard Operating Procedure (Invited)

    Science.gov (United States)

    Smith, L. M.; Wice, R. B.; Torrens, J.

    2013-12-01

    Over the last decade, many sectors of industrialized society have been rethinking behavior and re-engineering practices to reduce consumption of energy and natural resources. During this time, green and sustainable remediation (GSR) has evolved from conceptual discussions to standard operating procedure for many environmental remediation practitioners. Government agencies and private sector entities have incorporated GSR metrics into their performance criteria and contracting documents. One of the early think tanks for the development of GSR was the Sustainable Remediation Forum (SURF). SURF brings together representatives of government, industry, consultancy, and academia to parse the means and ends of incorporating societal and economic considerations into environmental cleanup projects. Faced with decades-old treatment programs with high energy outputs and no endpoints in sight, a small group of individuals published the institutional knowledge gathered in two years of ad hoc meetings into a 2009 White Paper on sustainable remediation drivers, practices, objectives, and case studies. Since then, SURF has expanded on those introductory topics, publishing its Framework for Integrating Sustainability into Remediation Projects, Guidance for Performing Footprint Analyses and Life-Cycle Assessments for the Remediation Industry, a compendium of metrics, and a call to improve the integration of land remediation and reuse. SURF's research and members have also been instrumental in the development of additional guidance through ASTM International and the Interstate Technology and Regulatory Council. SURF's current efforts focus on water reuse, the international perspective on GSR (continuing the conversations that were the basis of SURF's December 2012 meeting at the National Academy of Sciences in Washington, DC), and ways to capture and evaluate the societal benefits of site remediation. SURF also promotes and supports student chapters at universities across the US

  10. Zinc injection implementation process at EDF: risk analysis, chemical specifications and operating procedures

    International Nuclear Information System (INIS)

    Tigeras, A.; Stutzmann, A.; Bremnes, O.; Claeys, M.; Ranchoux, G.; Segura, J.C.; Errera, J.; Bonne, S.

    2010-01-01

    Zinc's ability to replace cobalt from oxides of primary circuit surfaces has provided the first motivation for implementing the zinc addition in BWRs since the mid-1980s. The beneficial results regarding dose reductions have been demonstrated; therefore, this practice has been extended to PWRs since the 1990s, not only for radiation fields considerations, but also for reducing PWSCC. From the beginning of the 2000s, further reasons to inject zinc associated with the fuel management process have been identified (e; g; power increase, high burn-up, and/or cycle length increase). These evolutions must be accompanied by an adapted chemistry program in order to mitigate the crud deposition on fuel assemblies and the consequent AOA/CIPS or localized clad corrosion risks. The source term reduction (due to the decrease of the general corrosion rate of several materials) and the absence of negative impact on alloy cladding in the presence of zinc in the primary coolant are the main reasons for selecting zinc injection as a reliable option for preventing and/or mitigating the effects of fuel deposits. These three PWR motivations (field radiation, components performance, and fuel reliability) are also the major objectives of CANDU®, WWER, and new reactors (EPR, AP1000), where the zinc injection feasibility analyses are in progress in order to improve the safety of their operating conditions. With the purpose of achieving the optimal results of zinc injection, the process's implantation in a unit must be conducted with an appropriate risk analysis, covering all possible domains affected by this primary coolant chemistry modification : safety, fuel and component performance, radioprotection, waste, environment, human and installation security, human and material resources, staff formation, and documentation. EDF has performed a complete analysis of this enlarged scope, relying upon theoretical and experimental results as well as NPP feedback. This paper describes EDF

  11. Operational test procedure for pumping and instrumentation control skid SALW-6001B monitor and control system

    International Nuclear Information System (INIS)

    Garcia, M.F.

    1995-11-01

    This OTP shall verify and document that the monitor and control system comprised of PICS SALW-6001B PLC, 242S PLC, Operator Control Station, and communication network is functioning per operational requirements

  12. Evaluation of the behavioral characteristics of the mdx mouse model of duchenne muscular dystrophy through operant conditioning procedures.

    Science.gov (United States)

    Lewon, Matthew; Peters, Christina M; Van Ry, Pam M; Burkin, Dean J; Hunter, Kenneth W; Hayes, Linda J

    2017-09-01

    The mdx mouse is an important nonhuman model for Duchenne muscular dystrophy (DMD) research. Characterizing the behavioral traits of the strain relative to congenic wild-type (WT) mice may enhance our understanding of the cognitive deficits observed in some humans with DMD and contribute to treatment development and evaluation. In this paper we report the results of a number of experiments comparing the behavior of mdx to WT mice in operant conditioning procedures designed to assess learning and memory. We found that mdx outperformed WT in all learning and memory tasks involving food reinforcement, and this appeared to be related to the differential effects of the food deprivation motivating operation on mdx mice. Conversely, WT outperformed mdx in an escape/avoidance learning task. These results suggest motivational differences between the strains and demonstrate the potential utility of operant conditioning procedures in the assessment of the behavioral characteristics of the mdx mouse. Copyright © 2017 Elsevier B.V. All rights reserved.

  13. 40 CFR 63.7323 - What procedures must I use to establish operating limits?

    Science.gov (United States)

    2010-07-01

    ... use to establish operating limits? (a) For a venturi scrubber applied to pushing emissions from a coke oven battery, you must establish site-specific operating limits for pressure drop and scrubber water... that meet the emission limit. (e) You may change the operating limit for a venturi scrubber, capture...

  14. Standard Operating Procedures for Preparing and Handling Sterile Male Tsetse flies for Release

    International Nuclear Information System (INIS)

    Argiles-Herrero, Rafa; Leak, Stephen G.A.

    2016-01-01

    The purpose of this SOP is to describe the procedures involved in preparing tsetse flies reared in a breeding facility for release in the field for the sterile insect technique (SIT) as a component of Area-Wide Insect pest Management (AW-IPM). Following the procedures which are outlined will help to ensure that the released sterile male tsetse flies are of optimal quality.

  15. The price of surgery: markup of operative procedures in the United States.

    Science.gov (United States)

    Gani, Faiz; Makary, Martin A; Pawlik, Timothy M

    2017-02-01

    Despite cost containment efforts, the price for surgery is not subject to any regulations. We sought to characterize and compare variability in pricing for commonly performed major surgical procedures across the United States. Medicare claims corresponding to eight major surgical procedures (aortic aneurysm repair, aortic valvuloplasty, carotid endartectomy, coronary artery bypass grafting, esophagectomy, pancreatectomy, liver resection, and colectomy) were identified using the Medicare Provider Utilization and Payment Data Physician and Other Supplier Public Use File for 2013. For each procedure, total charges, Medicare-allowable costs, and total payments were recorded. A procedure-specific markup ratio (MR; ratio of total charges to Medicare-allowable costs) was calculated and compared between procedures and across states. Variation in MR was compared using a coefficient of variation (CoV). Among all providers, the median MR was 3.5 (interquartile range: 3.1-4.0). MR was noted to vary by procedure; ranging from 3.0 following colectomy to 6.0 following carotid endartectomy (P < 0.001). MR also varied for the same procedure; varying the least after liver resection (CoV = 0.24), while coronary artery bypass grafting pricing demonstrated the greatest variation in MR (CoV = 0.53). Compared with the national average, MR varied by 36% between states ranging from 1.8 to 13.0. Variation in MR was also noted within the same state varying by 15% within the state of Arkansas (CoV = 0.15) compared with 51% within the state of Wisconsin (CoV = 0.51). Significant variation was noted for the price of surgery by procedure as well as between and within different geographical regions. Greater scrutiny and transparency in the price of surgery is required to promote cost containment. Copyright © 2016 Elsevier Inc. All rights reserved.

  16. Development of a VR training system of robotic peroral operation procedure for endoscopic surgery of digestive tracts

    International Nuclear Information System (INIS)

    Suzuki, Naoki; Hattori, Asaki; Tanoue, Kazuo; Ieiri, Satoshi; Konishi, Kozo; Tomikawa, Morimasa; Kenmotsu, Hajime; Hashizume, Makoto

    2010-01-01

    This report presents the development of a VR (virtual real) training system of robotic peroral operation procedure for endoscopic resection of gastric mucosa as the training is essential because the procedure differs from usual one hitherto. For VR operation space, used is reporters' sphere-filled organ model (SFM), which is deformed by and repels to, the outside force as a soft tissue rapidly in the real time. The deformation and repellence are computable. The SFM space is reconstructed to 3D of the inner environment of stomach using MRI data. The endoscope has, at the right and left side of its top, 2 arms of inner needle knife-equipped robotic forceps and is inserted perorally for operation. In VR, the forceps can grab the gastric mucosa, cut it with the knife to complete resection and carry the specimen out of the body. For the procedure training, the time required for hemostasis, bleeding volume, trace of the arms, intensity and direction of the outer force given are recorded, with which trainee's safety and degree of skill are evaluable in VR. Hydration step and clipping to close the wound are to be further added in the procedure. (T.T.)

  17. Splitting Ward identity

    Energy Technology Data Exchange (ETDEWEB)

    Safari, Mahmoud [Institute for Research in Fundamental Sciences (IPM), School of Particles and Accelerators, P.O. Box 19395-5531, Tehran (Iran, Islamic Republic of)

    2016-04-15

    Within the background-field framework we present a path integral derivation of the splitting Ward identity for the one-particle irreducible effective action in the presence of an infrared regulator, and make connection with earlier works on the subject. The approach is general in the sense that it does not rely on how the splitting is performed. This identity is then used to address the problem of background dependence of the effective action at an arbitrary energy scale. We next introduce the modified master equation and emphasize its role in constraining the effective action. Finally, application to general gauge theories within the geometric approach is discussed. (orig.)

  18. Splitting Ward identity

    International Nuclear Information System (INIS)

    Safari, Mahmoud

    2016-01-01

    Within the background-field framework we present a path integral derivation of the splitting Ward identity for the one-particle irreducible effective action in the presence of an infrared regulator, and make connection with earlier works on the subject. The approach is general in the sense that it does not rely on how the splitting is performed. This identity is then used to address the problem of background dependence of the effective action at an arbitrary energy scale. We next introduce the modified master equation and emphasize its role in constraining the effective action. Finally, application to general gauge theories within the geometric approach is discussed. (orig.)

  19. Bad splits in bilateral sagittal split osteotomy: systematic review of fracture patterns.

    Science.gov (United States)

    Steenen, S A; Becking, A G

    2016-07-01

    An unfavourable and unanticipated pattern of the mandibular sagittal split osteotomy is generally referred to as a 'bad split'. Few restorative techniques to manage the situation have been described. In this article, a classification of reported bad split pattern types is proposed and appropriate salvage procedures to manage the different types of undesired fracture are presented. A systematic review was undertaken, yielding a total of 33 studies published between 1971 and 2015. These reported a total of 458 cases of bad splits among 19,527 sagittal ramus osteotomies in 10,271 patients. The total reported incidence of bad split was 2.3% of sagittal splits. The most frequently encountered were buccal plate fractures of the proximal segment (types 1A-F) and lingual fractures of the distal segment (types 2A and 2B). Coronoid fractures (type 3) and condylar neck fractures (type 4) have seldom been reported. The various types of bad split may require different salvage approaches. Copyright © 2016 International Association of Oral and Maxillofacial Surgeons. Published by Elsevier Ltd. All rights reserved.

  20. Requirements for Computer Based-Procedures for Nuclear Power Plant Field Operators. Results from a Qualitative Study

    International Nuclear Information System (INIS)

    Le Blanc, Katya; Oxstrand, J.H.; Waicosky, T.

    2012-01-01

    Although computer-based procedures (CBPs) have been investigated as a way to enhance operator performance on procedural tasks in the nuclear industry for almost thirty years, they are not currently widely deployed at United States utilities. One of the barriers to the wide scale deployment of CBPs is the lack of operational experience with CBPs that could serve as a sound basis for justifying the use of CBPs for nuclear utilities. Utilities are hesitant to adopt CBPs because of concern over potential costs of implementation, and concern over regulatory approval. Regulators require a sound technical basis for the use of any procedure at the utilities; without operating experience to support the use CBPs, it is difficult to establish such a technical basis. In an effort to begin the process of developing a technical basis for CBPs, researchers at Idaho National Laboratory are partnering with industry to explore CBPs with the objective of defining requirements for CBPs and developing an industry-wide vision and path forward for the use of CBPs. This paper describes the results from a qualitative study aimed at defining requirements for CBPs to be used by field operators and maintenance technicians. (author)

  1. Mental readiness for maritime international operation: procedures developed by Norwegian navy

    OpenAIRE

    Sanden, Sverre; Johnsen, Bjørn Helge; Eid, Jarle; Pettersen, Jan Sommerfelt; Koefoed, Vilhelm F; Størksen, Roar; Røsseland, Atle; Neteland, Hans Olav; Wetteland, Per Inge; Wilhelmsen, Eirik Veum

    2014-01-01

    Seafarer’s mental health is vital for a well-functioning organisation. Neglecting mental health status on board could be extremely costly for both the crew affected as well as the company. The present article outlines an extensive programme implemented in the Royal Norwegian Navy for personnel deployed in international operations. The challenges involved in international operations bare similarities to onboard personnel in civilian maritime operations. The program utilised by the Royal Norweg...

  2. Computerized operating procedures for shearing and dissolution of segments from LWBR [Light Water Breeder Reactor] fuel rods

    International Nuclear Information System (INIS)

    Osudar, J.; Deeken, P.G.; Graczyk, D.G.; Fagan, J.E.; Martino, F.J.; Parks, J.E.; Levitz, N.M.; Kessie, R.W.; Leddin, J.M.

    1987-05-01

    This report presents two detailed computerized operating procedures developed to assist and control the shearing and dissolution of irradiated fuel rods. The procedures were employed in the destructive analysis of end-of-life fuel rods from the Light Water Breeder Reactor (LWBR) that was designed by the Westinghouse Electric Corporation Bettis Atomic Power Laboratory. Seventeen entire fuel rods from the end-of-life core of the LWBR were sheared into 169 precisely characterized segments, and more than 150 of these segments were dissolved during execution of the LWBR Proof-of-Breeding (LWBR-POB) Analytical Support Project at Argonne National Laboratory. The procedures illustrate our approaches to process monitoring, data reduction, and quality assurance during the LWBR-POB work

  3. Quantifying Nanoparticle Release from Nanotechnology: Scientific Operating Procedure Series: SOP C 3

    Science.gov (United States)

    2017-02-01

    5.2.1). It should be noted that the steps outlined in this procedure do not necessarily need to be performed in order; the reader is directed to...ICP-MS) or atomic emission spectroscopy (ICP-AES) should be performed on an acid- digested sample to test for the presence of those elements known to

  4. Administrative procedures for regulating construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Cochaud, J.P.

    1981-01-01

    This article first explains that nuclear power plants in France are governed by a complex system of regulations within the framework of different laws concerning, in particular, protection of the environment, public health and workers. It then examines the administrative procedures and the licensing regime for nuclear power plants. (NEA) [fr

  5. CTEPP STANDARD OPERATING PROCEDURE FOR CONDUCTING INTERNAL FIELD AUDITS AND QUALITY CONTROL (SOP-2.25)

    Science.gov (United States)

    This SOP describes the method for conducting internal field audits and quality control procedures. Internal field audits will be conducted to ensure the collection of high quality data. Internal field audits will be conducted by Field Auditors (the Field QA Officer and the Field...

  6. Splitting methods in communication, imaging, science, and engineering

    CERN Document Server

    Osher, Stanley; Yin, Wotao

    2016-01-01

    This book is about computational methods based on operator splitting. It consists of twenty-three chapters written by recognized splitting method contributors and practitioners, and covers a vast spectrum of topics and application areas, including computational mechanics, computational physics, image processing, wireless communication, nonlinear optics, and finance. Therefore, the book presents very versatile aspects of splitting methods and their applications, motivating the cross-fertilization of ideas. .

  7. Gastric emptying after a new, more physiological anti-obesity operation: the Magenstrasse and Mill procedure

    Energy Technology Data Exchange (ETDEWEB)

    Carmichael, A.R.; Johnston, D.; Barker, M.C.J.; Bury, R.F.; Boyce, J.; Sue-Ling, H. [Leeds General Infirmary (United Kingdom)

    2001-09-01

    The Magenstrasse and Mill (M and M) procedure for obesity is designed to preserve normal gastric emptying mechanisms. The hypothesis investigated in this study was that gastric emptying would be normal after the M and M gastroplasty. Gastric emptying studies were performed using both liquid and solid test meals, in ten morbidly obese patients (MO group) and in 13 patients after the M and M procedure (MM group). Seven people of normal weight served as controls and were matched for age, sex and height to the M and M and MO groups. Three years after the M and M procedure, mean (SD) weight loss was 42 (19) kg, with a mean loss of excess weight of 58% (20%). Gastric emptying half-times (t{sub 1/2}) are expressed in minutes, as median values (25th and 75th percentiles). The t{sub 1/2} for solids was 97 (85-110) min in the control group, 140 (86-220) min in the MO group and 79 (46-150) min in the MM group. Median gastric emptying for solids was 0.7% (0.6%-0.8%) per minute in the control group, 0.5% (0.3%-0.8%) in the MO group and 0.9% (0.4%-1.4%) in the M and M group. There were no statistically significant differences in the emptying times of the three groups. It is concluded that the M and M procedure achieves acceptable weight loss, while preserving gastric emptying mechanisms and thus minimising possible side-effects such as vomiting, dumping and diarrhoea, which are common complications of gastric bypass procedures. (orig.)

  8. Strategy over operation: neural activation in subtraction and multiplication during fact retrieval and procedural strategy use in children.

    Science.gov (United States)

    Polspoel, Brecht; Peters, Lien; Vandermosten, Maaike; De Smedt, Bert

    2017-09-01

    Arithmetic development is characterized by strategy shifts between procedural strategy use and fact retrieval. This study is the first to explicitly investigate children's neural activation associated with the use of these different strategies. Participants were 26 typically developing 4th graders (9- to 10-year-olds), who, in a behavioral session, were asked to verbally report on a trial-by-trial basis how they had solved 100 subtraction and multiplication items. These items were subsequently presented during functional magnetic resonance imaging. An event-related design allowed us to analyze the brain responses during retrieval and procedural trials, based on the children's verbal reports. During procedural strategy use, and more specifically for the decomposition of operands strategy, activation increases were observed in the inferior and superior parietal lobes (intraparietal sulci), inferior to superior frontal gyri, bilateral areas in the occipital lobe, and insular cortex. For retrieval, in comparison to procedural strategy use, we observed increased activity in the bilateral angular and supramarginal gyri, left middle to inferior temporal gyrus, right superior temporal gyrus, and superior medial frontal gyrus. No neural differences were found between the two operations under study. These results are the first in children to provide direct evidence for alternate neural activation when different arithmetic strategies are used and further unravel that previously found effects of operation on brain activity reflect differences in arithmetic strategy use. Hum Brain Mapp 38:4657-4670, 2017. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  9. Sexual Desire and Hypoactive Sexual Desire Disorder in Women. Introduction and Overview. Standard Operating Procedure (SOP Part 1)

    DEFF Research Database (Denmark)

    Bitzer, Johannes; Giraldi, Annamaria; Pfaus, Jim

    2013-01-01

    Introduction.  Hypoactive sexual desire disorder (HSDD) is defined in Diagnostic and Statistical Manual of Mental Disorders Fourth Edition as persistent or recurrent deficiency (or absence) of sexual fantasies/thoughts, and/or desire for or receptivity to sexual activity, which causes personal...... must be based on a biopsychosocial, multidimensional, and integrative perspective. Bitzer J, Giraldi A, and Pfaus J. Sexual desire and hypoactive sexual desire disorder in women. Introduction and overview. Standard operating procedure (SOP part 1). J Sex Med **;**:**-**....

  10. An approach toward estimating the safety significance of normal and abnormal operating procedures in nuclear power plants

    International Nuclear Information System (INIS)

    Grant, T.F.; Harris, M.S.

    1989-01-01

    The Nuclear Regulatory Commission's TMI Action Plan calls for a long-term plan to upgrade operating procedures in nuclear power plants. The scope of Generic Issue Human Factors 4.4, which stems from this requirement, includes the recommendation of improvements in nuclear power plant normal and abnormal operating procedures (NOPs and AOPs) and the implementation of appropriate regulatory action. This paper will describe the objectives, methodologies, and results of a Battelle-conducted value impact assessment to determine the costs and benefits of having the NRC implement regulatory action that would specify requirements for the preparation of acceptable NOPs and AOPs by the Commission's nuclear power plant licensees. The results of this value impact assessment are expressed in terms of ten cost/benefit attributes that can be affected by the NRC regulatory action. Five of these attributes require the calculation of change in public risk that could be expected to result from the action which, in this case, required determining the safety significance of NOPs and AOPs. In order to estimate this safety significance, a multi-step methodology was created that relies on an existing Probabilistic Risk Assessment (PRA) to provide a quantitative framework for modeling the role of operating procedures. The purpose of this methodology is to determine what impact the improvement of NOPs and AOPs would have on public health and safety

  11. Safety Precautions and Operating Procedures in an (A)BSL-4 Laboratory: 1. Biosafety Level 4 Suit Laboratory Suite Entry and Exit Procedures.

    Science.gov (United States)

    Janosko, Krisztina; Holbrook, Michael R; Adams, Ricky; Barr, Jason; Bollinger, Laura; Newton, Je T'aime; Ntiforo, Corrie; Coe, Linda; Wada, Jiro; Pusl, Daniela; Jahrling, Peter B; Kuhn, Jens H; Lackemeyer, Matthew G

    2016-10-03

    Biosafety level 4 (BSL-4) suit laboratories are specifically designed to study high-consequence pathogens for which neither infection prophylaxes nor treatment options exist. The hallmarks of these laboratories are: custom-designed airtight doors, dedicated supply and exhaust airflow systems, a negative-pressure environment, and mandatory use of positive-pressure ("space") suits. The risk for laboratory specialists working with highly pathogenic agents is minimized through rigorous training and adherence to stringent safety protocols and standard operating procedures. Researchers perform the majority of their work in BSL-2 laboratories and switch to BSL-4 suit laboratories when work with a high-consequence pathogen is required. Collaborators and scientists considering BSL-4 projects should be aware of the challenges associated with BSL-4 research both in terms of experimental technical limitations in BSL-4 laboratory space and the increased duration of such experiments. Tasks such as entering and exiting the BSL-4 suit laboratories are considerably more complex and time-consuming compared to BSL-2 and BSL-3 laboratories. The focus of this particular article is to address basic biosafety concerns and describe the entrance and exit procedures for the BSL-4 laboratory at the NIH/NIAID Integrated Research Facility at Fort Detrick. Such procedures include checking external systems that support the BSL-4 laboratory, and inspecting and donning positive-pressure suits, entering the laboratory, moving through air pressure-resistant doors, and connecting to air-supply hoses. We will also discuss moving within and exiting the BSL-4 suit laboratories, including using the chemical shower and removing and storing positive-pressure suits.

  12. Holomorphic Embedding for Loadflow Integration of Operational Thermal and Electric Reliable Procedural Systems, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This sound, low risk proposal aims at developing technology for the fundamental modeling and data processing needs of future autonomous operation. It addresses...

  13. Primaer brystrekonstruktion i forbindelse med mastektomi ved mammacancer. Indikation, procedure og umiddelbare operative resultater

    DEFF Research Database (Denmark)

    Elberg, J J; Mollerup, C L; Dahlstrøm, K K

    2000-01-01

    Mastectomy and immediate reconstruction of 122 breasts were performed in 109 patients in close collaboration between plastic surgeons and general surgeons. In 56 patients reconstruction was performed using tissue expanders including 13 bilateral operations, 29 patients had a latissimus dorsi...

  14. Library Operations Policies and Procedures, Volume 2. Central Archive for Reusable Defense Software (CARDS)

    Science.gov (United States)

    1994-02-28

    use and customize those policies and procedures applicable to the implementor’s situation. It is not the intent of this manual to restrict the library...improvements. Pare 10 ka•- V •DkI U Release Manager The Release Manager provides franchisees with media copies of existing libraries, as needed. Security...implementors, and potential library franchisees . Security Team The Security Team assists the Security Officer with security analysis. Team members are

  15. Normative questions connected with the procedure for approval and operation of nuclear installations

    International Nuclear Information System (INIS)

    Nocera, F.

    1980-03-01

    Recent regulatory developments in the licensing procedure for nuclear installations in Italy are discussed in the light of technical and scientific developments and international rules. The author then discusses the questions likely to be further defined and regulated, i.e. requirements for possession of fuels and fuel storage facilities, nuclear plant decommissioning, protection of the population with reference to the directives of the European Communities. (NEA) [fr

  16. Test Operations Procedure (TOP) 1-1-062 Environmental Effects Data Collection

    Science.gov (United States)

    2008-09-12

    this procedure. 11. ESTIMATION DESCRIPTION The prime example of an empirically based model is the Universal Soil Loss Equation ( USLE ) developed...impacts to human health and welfare and to the natural environment. The type of data collected might include noise levels, soil erosion, and...uptake relevant to flora/fauna and the soil erosion effects of proposed testing. c. Plan to identify any modifications/alternatives implemented

  17. Outcomes of PCI in Relation to Procedural Characteristics and Operator Volumes in the United States.

    Science.gov (United States)

    Fanaroff, Alexander C; Zakroysky, Pearl; Dai, David; Wojdyla, Daniel; Sherwood, Matthew W; Roe, Matthew T; Wang, Tracy Y; Peterson, Eric D; Gurm, Hitinder S; Cohen, Mauricio G; Messenger, John C; Rao, Sunil V

    2017-06-20

    Professional guidelines have reduced the recommended minimum number to an average of 50 percutaneous coronary intervention (PCI) procedures performed annually by each operator. Operator volume patterns and associated outcomes since this change are unknown. The authors describe herein PCI operator procedure volumes; characteristics of low-, intermediate-, and high-volume operators; and the relationship between operator volume and clinical outcomes in a large, contemporary, nationwide sample. Using data from the National Cardiovascular Data Registry collected between July 1, 2009, and March 31, 2015, we examined operator annual PCI volume. We divided operators into low- (100 PCIs per year) volume groups, and determined the adjusted association between annual PCI volume and in-hospital outcomes, including mortality. The median annual number of procedures performed per operator was 59; 44% of operators performed PCI procedures per year. Low-volume operators more frequently performed emergency and primary PCI procedures and practiced at hospitals with lower annual PCI volumes. Unadjusted in-hospital mortality was 1.86% for low-volume operators, 1.73% for intermediate-volume operators, and 1.48% for high-volume operators. The adjusted risk of in-hospital mortality was higher for PCI procedures performed by low- and intermediate-volume operators compared with those performed by high-volume operators (adjusted odds ratio: 1.16 for low versus high; adjusted odds ratio: 1.05 for intermediate vs. high volume) as was the risk for new dialysis post PCI. No volume relationship was observed for post-PCI bleeding. Many PCI operators in the United States are performing fewer than the recommended number of PCI procedures annually. Although absolute risk differences are small and may be partially explained by unmeasured differences in case mix between operators, there remains an inverse relationship between PCI operator volume and in-hospital mortality that persisted in risk

  18. Aircraft Configuration and Flight Crew Compliance with Procedures While Conducting Flight Deck Based Interval Management (FIM) Operations

    Science.gov (United States)

    Shay, Rick; Swieringa, Kurt A.; Baxley, Brian T.

    2012-01-01

    Flight deck based Interval Management (FIM) applications using ADS-B are being developed to improve both the safety and capacity of the National Airspace System (NAS). FIM is expected to improve the safety and efficiency of the NAS by giving pilots the technology and procedures to precisely achieve an interval behind the preceding aircraft by a specific point. Concurrently but independently, Optimized Profile Descents (OPD) are being developed to help reduce fuel consumption and noise, however, the range of speeds available when flying an OPD results in a decrease in the delivery precision of aircraft to the runway. This requires the addition of a spacing buffer between aircraft, reducing system throughput. FIM addresses this problem by providing pilots with speed guidance to achieve a precise interval behind another aircraft, even while flying optimized descents. The Interval Management with Spacing to Parallel Dependent Runways (IMSPiDR) human-in-the-loop experiment employed 24 commercial pilots to explore the use of FIM equipment to conduct spacing operations behind two aircraft arriving to parallel runways, while flying an OPD during high-density operations. This paper describes the impact of variations in pilot operations; in particular configuring the aircraft, their compliance with FIM operating procedures, and their response to changes of the FIM speed. An example of the displayed FIM speeds used incorrectly by a pilot is also discussed. Finally, this paper examines the relationship between achieving airline operational goals for individual aircraft and the need for ATC to deliver aircraft to the runway with greater precision. The results show that aircraft can fly an OPD and conduct FIM operations to dependent parallel runways, enabling operational goals to be achieved efficiently while maintaining system throughput.

  19. Analyses of systems availability and operator actions to support the development of severe accident procedures

    International Nuclear Information System (INIS)

    Lutz, R.J. Jr.; Scobel, J.H.

    1989-01-01

    This paper reports on traditional analyses of severe accidents, such as those presented in Probabilistic Risk Assessment (PRA) studies of nuclear power stations, that have generally been performed on the assumption that all means of cooling the reactor core are lost and that no operator actions to mitigate the consequences or progression of the severe accident are performed. The assumption to neglect the availability of safety systems and operator actions which do not prevent core melting can lead to erroneous conclusions regarding the plant severer accident profile. Recent work in severe accident management has identified the need to perform analyses which consider all systems availabilities and operator actions, irrespective of their contribution to the prevention of core melting. These new analyses indicate that the traditional analyses result in overfly pessimistic predictions of the time of core melting and the subsequent potential for recovery of core cooling prior to core melting. Additionally, since the traditional analyses do not model all of the operator actions which are prescribed, the impact of additional severe accident operator actions on the progression and consequences of the accident cannot be reliably identified. Further, the more detailed analysis can change the focus of the importance of various system to the prevention of core damage and the mitigation of severe accident consequences. Finally, the simplicity of the traditional analyses can have a considerable impact on severe accident decision making, particularly in the evaluation of alternate plant design features and the priorities for research studies

  20. Treatment of Atrial Fibrillation in Elderly Patients with the Cox Maze Procedure Concurrently with Other Cardiac Operations

    Directory of Open Access Journals (Sweden)

    Ja Hong Kuh

    2017-06-01

    Full Text Available Background: In elderly patients who have atrial fibrillation (AF, surgical ablation of the arrhythmia during cardiac surgery may be challenging. Despite the reported advantages of ablating AF with the Cox maze procedure (CMP, the addition of the CMP may complicate other cardiac operations. We evaluated the effect of the CMP in elderly patients concurrent with other cardiac operations. Methods: From October 2007 to December 2015, we enrolled 27 patients aged >70 years who had AF and who underwent the CMP concurrently with other cardiac operations. The mean preoperative additive European System for Cardiac Operative Risk Evaluation score was 8±11 (high risk. Results: Only 1 hospital death occurred (4%. The Kaplan-Meier method showed a high 5‐year cumulative survival rate (92%. At mean follow‐up of 51 months, 23 patients (89% had sinus rhythm conversion. The postoperative left atrial dimensions did not significantly differ between the 8 patients who had reduction plasty for giant left atrium (53.4±7.5 cm and the 19 patients who did not have reduction plasty (48.7±5.7 cm. Conclusion: In patients aged >70 years, concurrent CMP may be associated with a high rate of sinus rhythm conversion without increased surgical risk, despite the added complexity of the main cardiac procedure.

  1. Acceptance/operational test procedure 101-AW tank camera purge system and 101-AW video camera system

    International Nuclear Information System (INIS)

    Castleberry, J.L.

    1994-01-01

    This procedure will document the satisfactory operation of the 101-AW Tank Camera Purge System (CPS) and the 101-AW Video Camera System. The safety interlock which shuts down all the electronics inside the 101-AW vapor space, during loss of purge pressure, will be in place and tested to ensure reliable performance. This procedure is separated into four sections. Section 6.1 is performed in the 306 building prior to delivery to the 200 East Tank Farms and involves leak checking all fittings on the 101-AW Purge Panel for leakage using a Snoop solution and resolving the leakage. Section 7.1 verifies that PR-1, the regulator which maintains a positive pressure within the volume (cameras and pneumatic lines), is properly set. In addition the green light (PRESSURIZED) (located on the Purge Control Panel) is verified to turn on above 10 in. w.g. and after the time delay (TDR) has timed out. Section 7.2 verifies that the purge cycle functions properly, the red light (PURGE ON) comes on, and that the correct flowrate is obtained to meet the requirements of the National Fire Protection Association. Section 7.3 verifies that the pan and tilt, camera, associated controls and components operate correctly. This section also verifies that the safety interlock system operates correctly during loss of purge pressure. During the loss of purge operation the illumination of the amber light (PURGE FAILED) will be verified

  2. Recommended operating procedure number 56: Collection of gaseous grab samples from combustion sources for nitrous oxide measurement. Final report, Jan-Dec 91

    International Nuclear Information System (INIS)

    Ryan, J.V.; Karns, S.A.

    1992-07-01

    The document is a recommended operating procedure (ROP), prepared for use in research activities conducted by EPA's Air and Energy Engineering Research Laboratory (AEERL). The procedure applies to the collection of gaseous grab samples from fossil fuel combustion sources for subsequent analysis of nitrous oxide. The procedure details only the grab sampling methodology and associated equipment

  3. Split warhead simultaneous impact

    Directory of Open Access Journals (Sweden)

    Rahul Singh Dhari

    2017-12-01

    Full Text Available A projectile system is proposed to improve efficiency and effectiveness of damage done by anti-tank weapon system on its target by designing a ballistic projectile that can split into multiple warheads and engage a target at the same time. This idea has been developed in interest of saving time consumed from the process of reloading and additional number of rounds wasted on target during an attack. The proposed system is achieved in three steps: Firstly, a mathematical model is prepared using the basic equations of motion. Second, An Ejection Mechanism of proposed warhead is explained with the help of schematics. Third, a part of numerical simulation which is done using the MATLAB software. The final result shows various ranges and times when split can be effectively achieved. With the new system, impact points are increased and hence it has a better probability of hitting a target.

  4. Procedure to evaluate and control efficiently the operations management of medical equipment in the maintenance unit of a health institution

    Directory of Open Access Journals (Sweden)

    Herrera-Galán Michael

    2018-01-01

    Full Text Available Maintenance management plays a very important role in the success of any company. As a consequence of this, in the year of 2013, a study was carried out in health facilities found in the South Eastern Region of Jamaica with the objective of evaluating the existing Maintenance Management Program for Medical Equipment. Among the results obtained, it showed that there is an inadequacy in the existing program whose principal deficiency is attributed to the operations management. As such, this work proposes a procedure for evaluating and controlling in an efficient manner the operations management within the Biomedical Department which forms part of the South East Regional Health Authority Maintenance Unit (SERHAMU, this latter is found on the premises of the Bustamante Hospital for Children (BHC, Jamaica. The method used to develop the procedure (GOMHO is based fundamentally on the design of: a codification system to identify control registers and to record failures associated with each equipment, a system of placing equipment into categories and further differentiating them based on the potential hazard such pose on the human body in the event of an operational failure. In addition, this procedure gives the SERHAMU at the BHC the opportunity to calculate the amount of human resources needed to carry out efficiently the preventative and corrective maintenance work being demanded on the department. During the implementation phase, the results demonstrated that from the control procedure designed there was an improvement in the planning and carrying out of maintenance work and a better system of monitoring the activities that are executed. Also, it was evidenced that there is a 61.53% of the amount of human resources needed to carry out the maintenance actions.

  5. Isospin splittings of baryons

    International Nuclear Information System (INIS)

    Varga, Kalman; Genovese, Marco; Richard, Jean-Marc; Silvestre-Brac, Bernard

    1998-01-01

    We discuss the isospin-breaking mass differences among baryons, with particular attention in the charm sector to the Σ c + -Σ c 0 , Σ c ++ -Σ c 0 , and Ξ c + -Ξ c 0 splittings. Simple potential models cannot accommodate the trend of the available data on charm baryons. More precise measurements would offer the possibility of testing how well potential models describe the non-perturbative limit of QCD

  6. Experimental evaluation of emergency operating procedures on multiple steam generator tube rupture in INER integral system test facility

    International Nuclear Information System (INIS)

    Liu, T.J.; Lin, Y.M.; Lee, C.H.; Chang, C.Y.; Hong, W.T.

    1997-01-01

    The multiple steam generator tube rupture (SGTR) scenario in Westinghouse type pressurized water reactor (PWR) has been investigated at the Institute of Nuclear Energy Research (INER) Integral System Test (IIST) facility. This reduced-height and reduced-pressure test facility was designed to simulate the main features of Maanshan nuclear power plant. The SGTR test scenario assumes the double-ended break of one-, two- and six- tubes without other failures. The major operator actions follow the related symptom-oriented Emergency Operating Procedure (EOP) on the reference plant. This study focuses on the investigation of thermal-hydraulics phenomena and the adequacy of associated EOP to limit primary-to-secondary leakage. Through this study, it is found that the adequacy of current EOP in minimizing the radioactivity release demands early substantial operator involvement, especially in the multi-tubes break events. Also, the detailed mechanism of the main thermal-hydraulic phenomena during the SGTR transient are explored. (author)

  7. A Guide for Developing Standard Operating Job Procedures for the Tertiary Chemical Treatment - Lime Precipitation Process Wastewater Treatment Facility. SOJP No. 6.

    Science.gov (United States)

    Petrasek, Al, Jr.

    This guide describes the standard operating job procedures for the tertiary chemical treatment - lime precipitation process of wastewater treatment plants. Step-by-step instructions are given for pre-start up, start-up, continuous operation, and shut-down procedures. In addition, some theoretical material is presented along with some relevant…

  8. Methodology of complexity analysis of Emergency Operating Procedures for Nuclear Power Plants; Metodologia de analisis de complejidad de Procedimientos de Operacion de Emergencia de Centrales Nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Martorell, P.; Martorell, S.; Marton, I.; Pelayo, F.; Mendizabal, R.

    2013-07-01

    The Emergency Operating Procedures (SOPs) set out the stages and contain actions to be executed by an operator to respond to an emergency situation. Methodologies are being developed to assess aspects such as complexity, completeness and vulnerability of these procedures. A methodology is presented in this paper to develop a network topology POE and analysis focused on the same complexity as a fundamental attribute.

  9. (O)Mega split

    Energy Technology Data Exchange (ETDEWEB)

    Benakli, Karim; Darmé, Luc; Goodsell, Mark D. [Sorbonne Universités, UPMC Univ Paris 06, UMR 7589,LPTHE, F-75005, Paris (France); CNRS, UMR 7589,LPTHE, F-75005, Paris (France)

    2015-11-16

    We study two realisations of the Fake Split Supersymmetry Model (FSSM), the simplest model that can easily reproduce the experimental value of the Higgs mass for an arbitrarily high supersymmetry scale M{sub S}, as a consequence of swapping higgsinos for equivalent states, fake higgsinos, with suppressed Yukawa couplings. If the LSP is identified as the main Dark matter component, then a standard thermal history of the Universe implies upper bounds on M{sub S}, which we derive. On the other hand, we show that renormalisation group running of soft masses aboveM{sub S} barely constrains the model — in stark contrast to Split Supersymmetry — and hence we can have a “Mega Split” spectrum even with all of these assumptions and constraints, which include the requirements of a correct relic abundance, a gluino life-time compatible with Big Bang Nucleosynthesis and absence of signals in present direct detection experiments of inelastic dark matter. In an appendix we describe a related scenario, Fake Split Extended Supersymmetry, which enjoys similar properties.

  10. Salt splitting using ceramic membranes

    Energy Technology Data Exchange (ETDEWEB)

    Kurath, D.E. [Pacific Northwest National Lab., Richland, WA (United States)

    1997-10-01

    Many radioactive aqueous wastes in the DOE complex have high concentrations of sodium that can negatively affect waste treatment and disposal operations. Sodium can decrease the durability of waste forms such as glass and is the primary contributor to large disposal volumes. Waste treatment processes such as cesium ion exchange, sludge washing, and calcination are made less efficient and more expensive because of the high sodium concentrations. Pacific Northwest National Laboratory (PNNL) and Ceramatec Inc. (Salt Lake City UT) are developing an electrochemical salt splitting process based on inorganic ceramic sodium (Na), super-ionic conductor (NaSICON) membranes that shows promise for mitigating the impact of sodium. In this process, the waste is added to the anode compartment, and an electrical potential is applied to the cell. This drives sodium ions through the membrane, but the membrane rejects most other cations (e.g., Sr{sup +2}, Cs{sup +}). The charge balance in the anode compartment is maintained by generating H{sup +} from the electrolysis of water. The charge balance in the cathode is maintained by generating OH{sup {minus}}, either from the electrolysis of water or from oxygen and water using an oxygen cathode. The normal gaseous products of the electrolysis of water are oxygen at the anode and hydrogen at the cathode. Potentially flammable gas mixtures can be prevented by providing adequate volumes of a sweep gas, using an alternative reductant or destruction of the hydrogen as it is generated. As H{sup +} is generated in the anode compartment, the pH drops. The process may be operated with either an alkaline (pH>12) or an acidic anolyte (pH <1). The benefits of salt splitting using ceramic membranes are (1) waste volume reduction and reduced chemical procurement costs by recycling of NaOH; and (2) direct reduction of sodium in process streams, which enhances subsequent operations such as cesium ion exchange, calcination, and vitrification.

  11. 36 CFR 251.124 - Preferred operator competitive special use authorization procedures.

    Science.gov (United States)

    2010-07-01

    ... entrepreneurship, nonprofit entity, or other form of organization shall be considered valid only when the... entrepreneurship, nonprofit entity, or other form of organization. (f) A qualified preferred operator shall be... shall be given the opportunity, by amending its application, to meet the terms and conditions of the...

  12. Test Operations Procedure (TOP) 02-2-603A Vehicle Fuel Consumption

    Science.gov (United States)

    2012-05-10

    API) Hydrometer . The API Hydrometer is used for accurate determination of the density, relative density (specific gravity), or API gravity of... Hydrometer Method. 5. TOP 02-2-505, Inspection and Preliminary Operation of Vehicles, 4 February 1987. 6. TOP 02-1-003, Hybrid Electric

  13. Terrorist-Insurgent Thinking and Joint Special Operational Planning Doctrine and Procedures

    Science.gov (United States)

    2010-09-01

    b. Often organized planners, with some military training/experience c. Usually the brains behind operations or targeting and having the most detailed... Storytelling and Terrorism: Towards a Compre- hensive ‘Counter-Narrative Strategy,’ ” Strategic Insights IV:3 (March 2005), 1-16. Center for Army Lessons

  14. On the reform of nuclear licensing procedures for plants and operation

    International Nuclear Information System (INIS)

    Lecheler, H.

    1977-01-01

    The nuclear licensing procedures require basic reforming. In doing so, there must be a differentiation between (concrete) licensing of plants and (abstract) decisions on site provision. The provision of sites is exercised directly by the diets of the Laender. For this purpose they enact planning laws on sites for nuclear power plants of different sizes. As far as the Federal law is touched upon (especially the Federal act on construction), the Federal legislator has to concede competences to the Laender. No. 6 of section 7 II of the Atomic Energy Act would have to be deleted. The plant licensing procedure is to be limited to a mere safety check-up of a concrete plant. Licensing prerequisites of the Atomic Energy Act are to be made more precise by the Federal legislator, namely by deciding unequivocally the purpose of the law, whether priority is given to promotion or to protection, and by making the enacting of tangible regulations a duty. When these licensing prerequisites exist, the law has to concede the applicant a plain title to licensing. (orig.) [de

  15. Safety Precautions and Operating Procedures in an (A)BSL-4 Laboratory: 2. General Practices.

    Science.gov (United States)

    Mazur, Steven; Holbrook, Michael R; Burdette, Tracey; Joselyn, Nicole; Barr, Jason; Pusl, Daniela; Bollinger, Laura; Coe, Linda; Jahrling, Peter B; Lackemeyer, Matthew G; Wada, Jiro; Kuhn, Jens H; Janosko, Krisztina

    2016-10-03

    Work in a biosafety level 4 (BSL-4) containment laboratory requires time and great attention to detail. The same work that is done in a BSL-2 laboratory with non-high-consequence pathogens will take significantly longer in a BSL-4 setting. This increased time requirement is due to a multitude of factors that are aimed at protecting the researcher from laboratory-acquired infections, the work environment from potential contamination and the local community from possible release of high-consequence pathogens. Inside the laboratory, movement is restricted due to air hoses attached to the mandatory full-body safety suits. In addition, disinfection of every item that is removed from Class II biosafety cabinets (BSCs) is required. Laboratory specialists must be trained in the practices of the BSL-4 laboratory and must show high proficiency in the skills they are performing. The focus of this article is to outline proper procedures and techniques to ensure laboratory biosafety and experimental accuracy using a standard viral plaque assay as an example procedure. In particular, proper techniques to work safely in a BSL-4 environment when performing an experiment will be visually emphasized. These techniques include: setting up a Class II BSC for experiments, proper cleaning of the Class II BSC when finished working, waste management and safe disposal of waste generated inside a BSL-4 laboratory, and the removal of inactivated samples from inside a BSL-4 laboratory to the BSL-2 laboratory.

  16. Application of revised procedure on determining large excess reactivity of operating reactor. Fuel addition method

    International Nuclear Information System (INIS)

    Nagao, Yoshiharu

    2002-01-01

    The fuel addition method or the neutron absorption substitution method have been used for determination of large excess multiplication factor of large sized reactors. It has been pointed out, however, that all the experimental methods are possibly not free from the substantially large systematic error up to 20%, when the value of the excess multiplication factor exceeds about 15%Δk. Then, a basic idea of a revised procedure was proposed to cope with the problem, which converts the increase of multiplication factor in an actual core to that in a virtual core by calculation, because its value is in principle defined not for the former but the latter core. This paper proves that the revised procedure is able to be applicable for large sized research and test reactors through the theoretical analyses on the measurements undertaken at the JMTRC and JMTR cores. The values of excess multiplication factor are accurately determined utilizing the whole core calculation by the Monte Carlo code MCNP4A. (author)

  17. Procedures for operational monitoring of the environmental equivalent doses in cobalt therapy

    International Nuclear Information System (INIS)

    Perez Velasquez, Reytel; Gonzalez Lopez, Nadia; Perez Tamayo, Luis

    2009-01-01

    It took as its object of study environmental equivalent dose rates of field radiation they face radiophysicists technicians and medical physicists in the irradiation site of the radiation department of Lenin Hospital in Holguin, and the public that travels or remains in premises and areas surrounding the campus. It A review of national and international publications as well as technical documents to study the state of the art of the methodological existing monitoring of those dose rates and the valuation of impact in the context of an environmental management system. Since no detailed instructions and to perform the above-mentioned monitoring was proposed structure should contain a procedure to regulate the steps for this monitoring in the radiotherapy department of the Lenin Hospital Holguin, for which we studied the guidelines of NC ISO 14000 , and was conducted wide experiment whose led to: illustrate the level of doses required workers exposed occupationally exposed to radiation and the public compare these levels with natural radiation sources, assess the effectiveness of shielding the site of irradiation and the points of greatest risk within and outside the enclosure irradiation.Also assessed the impact it can have on the health of people exposed to such doses. Finally, we proposed a procedure for conducting subsequent monitoring and made recommendations to reduce levels radiation determined the lowest level reasonably achievable. (author)

  18. Towards large volume big divisor D3/D7 “μ-split supersymmetry” and Ricci-flat Swiss-cheese metrics, and dimension-six neutrino mass operators

    International Nuclear Information System (INIS)

    Dhuria, Mansi; Misra, Aalok

    2012-01-01

    We show that it is possible to realize a “μ-split SUSY” scenario (Cheng and Cheng, 2005) in the context of large volume limit of type IIB compactifications on Swiss-cheese Calabi-Yau orientifolds in the presence of a mobile space-time filling D3-brane and a (stack of) D7-brane(s) wrapping the “big” divisor. For this, we investigate the possibility of getting one Higgs to be light while other to be heavy in addition to a heavy higgsino mass parameter. Further, we examine the existence of long lived gluino that manifests one of the major consequences of μ-split SUSY scenario, by computing its decay width as well as lifetime corresponding to the three-body decays of the gluino into either a quark, a squark and a neutralino or a quark, squark and goldstino, as well as two-body decays of the gluino into either a neutralino and a gluon or a goldstino and a gluon. Guided by the geometric Kähler potential for Σ B obtained in Misra and Shukla (2010) based on GLSM techniques, and the Donaldson's algorithm (Barun et al., 2008) for obtaining numerically a Ricci-flat metric, we give details of our calculation in Misra and Shukla (2011) pertaining to our proposed metric for the full Swiss-cheese Calabi-Yau (the geometric Kähler potential being needed to be included in the full moduli space Kähler potential in the presence of the mobile space-time filling D3-brane), but for simplicity of calculation, close to the big divisor, which is Ricci-flat in the large volume limit. Also, as an application of the one-loop RG flow solution for the higgsino mass parameter, we show that the contribution to the neutrino masses at the EW scale from dimension-six operators arising from the Kähler potential, is suppressed relative to the Weinberg-type dimension-five operators.

  19. High efficiency beam splitting for H- accelerators

    International Nuclear Information System (INIS)

    Kramer, S.L.; Stipp, V.; Krieger, C.; Madsen, J.

    1985-01-01

    Beam splitting for high energy accelerators has typically involved a significant loss of beam and radiation. This paper reports on a new method of splitting beams for H - accelerators. This technique uses a high intensity flash of light to strip a fraction of the H - beam to H 0 which are then easily separated by a small bending magnet. A system using a 900-watt (average electrical power) flashlamp and a highly efficient collector will provide 10 -3 to 10 -2 splitting of a 50 MeV H - beam. Results on the operation and comparisons with stripping cross sections are presented. Also discussed is the possibility for developing this system to yield a higher stripping fraction

  20. PFPF canister counter for foreign plutonium (PCAS-3) hardware operations and procedures manual

    International Nuclear Information System (INIS)

    Menlove, H.O.; Baca, J.; Kroncke, K.E.; Miller, M.C.; Takahashi, S.; Seki, S.; Inose, S.; Yamamoto, T.

    1993-01-01

    A neutron coincidence counter has been designed for the measurement of plutonium powder contained in tall storage canisters. The counter was designed for installation in the Plutonium Fuel Production Facility fabrication plant. Each canister contains from one to five cans of PuO 2 . The neutron counter measures the spontaneous-fission rate from the plutonium and, when this is combined with the plutonium isotopic ratios, the plutonium mass is determined. The system can accommodate plutonium loadings up to 12 kg, with 10 kg being a typical loading. Software has been developed to permit the continuous operation of the system in an unattended mode. Authentication techniques have been developed for the system. This manual describes the system and its operation and gives performance and calibration parameters for typical applications

  1. Test Operations Procedure (TOP) 05-2-543 Enhanced Flight Termination Receiver (EFTR) Range Certification Testing

    Science.gov (United States)

    2011-07-25

    35 5.10 Signal Strength Telemetry Output ( SSTO ) (Test Number 10) ............ 38 5.11 Operational...All command outputs and monitor outputs shall respond properly. TOP 05-2-543 25 July 2011 38 5.10 Signal Strength Telemetry Output ( SSTO ...Test Number 10). a. Purpose. This test verifies that the signal strength telemetry output ( SSTO ) voltage is monotonic and directly related to the

  2. Natural Resource Information System. Volume 2: System operating procedures and instructions

    Science.gov (United States)

    1972-01-01

    A total computer software system description is provided for the prototype Natural Resource Information System designed to store, process, and display data of maximum usefulness to land management decision making. Program modules are described, as are the computer file design, file updating methods, digitizing process, and paper tape conversion to magnetic tape. Operating instructions for the system, data output, printed output, and graphic output are also discussed.

  3. Multiplet mass splitting in a gravitational field

    International Nuclear Information System (INIS)

    Maia, M.D.

    An expression for the mass splitting of particles belonging to the same spin multiplet defined in a space-time of general relativity is derived. The geometrical symmetry is a subgroup of SO(r,s), 9 >=r > 3, 5 >=s >=1, the mass operator being proportional to the second order Casimir operator of that subgroup. A brief analysis of the calculated values as compared to the experimental data is included. (Author) [pt

  4. Example of an application of an assessment procedure for defects in plant operating in the creep range

    International Nuclear Information System (INIS)

    Ainsworth, R.; Coleman, M.C.

    1986-10-01

    A worked example is presented to illustrate the application of a CEGB procedure for the assessment of defects in plant that operates within the creep range. The example chosen is a large cylindrical pressure vessel with a fully circumferential crack for which experimental results are available. The example demonstrates that it is straightforward to perform the calculations required in the procedure for the time for structural failure by continuum damage mechanisms, the time for crack incubation and the time for crack growth. It is predicted that crack incubation in the pressure vessel occurs at about one-third of life with the remaining life being taken up by crack growth. The predictions are in close agreement with the experimentally observed incubation, growth and final failure times. (UK)

  5. Elaboration and implementation of standard operational procedure for quality assurance of cone beam CT image in radiotherapy

    International Nuclear Information System (INIS)

    Bonatto, Larisse N.; Estacio, Daniela R.; Lopes, Juliane S.; Sansson, Angela; Duarte, Lucas O.; Sbaraini, Patricia; Silva, Ana M. Marques da; Streck, Elaine E.

    2016-01-01

    The objective of this article is to present the implementation of the quality Control of Cone Beam Computed Tomography (CBCT) image, generated by the On-Board Imager, integrated with the linear accelerator Trilogy. Standard operating procedures (POPs) have been developed based on the literature and manuals of the simulator object Catphan 504 and the On-Board Imager. The following POPs were developed: acquisition of the CBCT image; linearity of CT number; uniformity; spatial resolution; low contrast resolution; spatial linearity; thickness of the cut. The validation of the elaborated procedures was done from an experimental acquisition of the simulator object. The results obtained in the validation of the POPs are in compliance with the parameters established by the manufacturer of the simulator object, as well as those obtained in the acceptance of the On-Board Imager device.

  6. Description of design and operating procedures of small scale pulsed columns for experimental study on extraction process under abnormal conditions

    International Nuclear Information System (INIS)

    Wakamatsu, Sachio; Sato, Makoto; Kubo, Nobuo; Sakurai, Satoshi; Ami, Norio

    1990-09-01

    To study transient phenomena in a pulsed column co-decontamination process under abnormal conditions, a pair of small scale pulsed columns (effective extraction section; I.D: 25 mm, H.: 2260 mm) for extraction and scrub were installed in the laboratory. An evaporator of aqueous uranium solution was also equipped to reuse concentrated solution as the feed. This report describes several items to have been carefully treated in design, specification and operating procedure of the apparatuses for the experiments. Also described are the procedures for preparation of the feed solutions and treatments of the solutions after the experiments; back-extraction of uranium, diluent washing, alkaline washing and concentration of uranium solution. (author)

  7. Numerical simulation of the transient thermal-hydraulic behaviour of the ITER blanket cooling system under the draining operational procedure

    Energy Technology Data Exchange (ETDEWEB)

    Di Maio, P.A. [Dipartimento di Energia, Ingegneria dell’Informazione e Modelli Matematici, Università di Palermo Viale delle Scienze, 90128 Palermo (Italy); Dell’Orco, G.; Furmanek, A. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Garitta, S. [Dipartimento di Energia, Ingegneria dell’Informazione e Modelli Matematici, Università di Palermo Viale delle Scienze, 90128 Palermo (Italy); Merola, M.; Mitteau, R.; Raffray, R. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Spagnuolo, G.A. [Dipartimento di Energia, Ingegneria dell’Informazione e Modelli Matematici, Università di Palermo Viale delle Scienze, 90128 Palermo (Italy); Vallone, E., E-mail: eug.vallone@gmail.com [Dipartimento di Energia, Ingegneria dell’Informazione e Modelli Matematici, Università di Palermo Viale delle Scienze, 90128 Palermo (Italy)

    2015-10-15

    Highlights: • ITER blanket cooling system hydraulic behaviour is studied under draining transient. • A computational approach based on the finite volume method has been followed. • Draining efficiency has been assessed in term of transient duration and residual water. • Transient duration ranges from ∼40 to 50 s, under the reference draining scenario. • Residual water is predicted to range from few tens of gram up to few kilograms. - Abstract: Within the framework of the research and development activities supported by the ITER Organization on the blanket system issues, an intense analysis campaign has been performed at the University of Palermo with the aim to investigate the thermal-hydraulic behaviour of the cooling system of a standard 20° sector of ITER blanket during the draining transient operational procedure. The analysis has been carried out following a theoretical-computational approach based on the finite volume method and adopting the RELAP5 system code. In a first phase, attention has been focused on the development and validation of the finite volume models of the cooling circuits of the most demanding modules belonging to the standard blanket sector. In later phase, attention has been put to the numerical simulation of the thermal-hydraulic transient behaviour of each cooling circuit during the draining operational procedure. The draining procedure efficiency has been assessed in terms of both transient duration and residual amount of coolant inside the circuit, observing that the former ranges typically between 40 and 120 s and the latter reaches at most ∼8 kg, in the case of the cooling circuit of twinned modules #6–7. Potential variations to operational parameters and/or to circuit lay-out have been proposed and investigated to optimize the circuit draining performances. In this paper, the set-up of the finite volume models is briefly described and the key results are summarized and critically discussed.

  8. Effective Crew Operations: An Analysis of Technologies for Improving Crew Activities and Medical Procedures

    Science.gov (United States)

    Harvey, Craig

    2005-01-01

    NASA's vision for space exploration (February 2004) calls for development of a new crew exploration vehicle, sustained lunar operations, and human exploration of Mars. To meet the challenges of planned sustained operations as well as the limited communications between Earth and the crew (e.g., Mars exploration), many systems will require crews to operate in an autonomous environment. It has been estimated that once every 2.4 years a major medical issue will occur while in space. NASA's future travels, especially to Mars, will begin to push this timeframe. Therefore, now is the time for investigating technologies and systems that will support crews in these environments. Therefore, this summer two studies were conducted to evaluate the technology and systems that may be used by crews in future missions. The first study evaluated three commercial Indoor Positioning Systems (IPS) (Versus, Ekahau, and Radianse) that can track equipment and people within a facility. While similar to Global Positioning Systems (GPS), the specific technology used is different. Several conclusions can be drawn from the evaluation conducted, but in summary it is clear that none of the systems provides a complete solution in meeting the tracking and technology integration requirements of NASA. From a functional performance (e.g., system meets user needs) evaluation perspective, Versus performed fairly well on all performance measures as compared to Ekahau and Radianse. However, the system only provides tracking at the room level. Thus, Versus does not provide the level of fidelity required for tracking assets or people for NASA requirements. From an engineering implementation perspective, Ekahau is far simpler to implement that the other two systems because of its wi-fi design (e.g., no required runs of cable). By looking at these two perspectives, one finds there was no clear system that met NASA requirements. Thus it would be premature to suggest that any of these systems are ready for

  9. Dataset and standard operating procedure for newborn screening of six lysosomal storage diseases: By tandem mass spectrometry

    Directory of Open Access Journals (Sweden)

    Susan Elliott

    2016-09-01

    Full Text Available In this data article we provide a detailed standard operating procedure for performing a tandem mass spectrometry, multiplex assay of 6 lysosomal enzymes for newborn screening of the lysosomal storage diseases Mucopolysaccharidosis-I, Pompe, Fabry, Niemann-Pick-A/B, Gaucher, and Krabbe, (Elliott, et al., 2016 [1]. We also provide the mass spectrometry peak areas for the product and internal standard ions typically observed with a dried blood spot punch from a random newborn, and we provide the daily variation of the daily mean activities for all 6 enzymes.

  10. Model for the Value of a Business, Some Optimisation Problems in its Operating Procedures and the Valuation of its Debt

    OpenAIRE

    M.Z. Apabhai; N.I. Georgikopoulos; D. Hasnip; R.K.D. Jamie; M. Kim

    1999-01-01

    In this paper we present a model for the value of a firm based on observable variables and parameters: the annual turnover, the expenses, interest rates. This value is the solution of a parabolic partial differential equation. We show how the value of the company depends on its legal status such as its liability (i.e. whether it is a Limited Company or a sole trader/partnership). We give examples of how the operating procedures can be optimised (e.g. whether the firm should close down, reloca...

  11. Core instrumentation and pre-operational procedures for core conversion HEU to LEU

    International Nuclear Information System (INIS)

    1984-02-01

    This report is intended for the reactor operator, to be used as a manual or checklist for general guidance on pre-startup activities that need to be addressed in preparation for conversion to Low Enriched Fuel (LEU). All nuclear, thermodynamic and safety calculations should have been performed prior to this stage of the core conversion process. During these calculations and certainly before ordering the new LEU fuel elements the reactor operator needs to very carefully consider additional important factors concerning the new fuel: fuel reliability, reliability of fuel fabricator, reprocessing contract or fuel element storage and disposal, economics of the new fuel cycle. At this stage, too, a preoperational experimental programme has to be developed and presented to the regulatory authorities for approval. This experimental programme could lead to additional requirements on: in-core instrumentation, out-of-core instrumentation or additional experimental devices. Detailed instructions on specific tests and measurements are not provided in this report since much information on the subject is available in the open literature

  12. Incorporating wind generation forecast uncertainty into power system operation, dispatch, and unit commitment procedures

    Energy Technology Data Exchange (ETDEWEB)

    Makarov, Yuri V.; Etingov, Pavel V.; Huang, Zhenyu; Ma, Jiam; Subbarao, Krishnappa [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)

    2010-07-01

    An approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. An assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty - both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures). A new method called the ''flying-brick'' technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through integration with an EMS system illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems from other vendors. (orig.)

  13. Safety Precautions and Operating Procedures in an (A)BSL-4 Laboratory: 3. Aerobiology.

    Science.gov (United States)

    Bohannon, J Kyle; Janosko, Krisztina; Holbrook, Michael R; Barr, Jason; Pusl, Daniela; Bollinger, Laura; Coe, Linda; Hensley, Lisa E; Jahrling, Peter B; Wada, Jiro; Kuhn, Jens H; Lackemeyer, Matthew G

    2016-10-03

    Aerosol or inhalational studies of high-consequence pathogens have recently been increasing in number due to the perceived threat of intentional aerosol releases or unexpected natural aerosol transmission. Specific laboratories designed to perform these experiments require tremendous engineering controls to provide a safe and secure working environment and constant systems maintenance to sustain functionality. Class III biosafety cabinets, also referred to as gloveboxes, are gas-tight enclosures with non-opening windows. These cabinets are maintained under negative pressure by double high-efficiency-particulate-air (HEPA)-filtered exhaust systems and are the ideal primary containment for housing aerosolization equipment. A well planned workflow between staff members within high containment from, for instance, an animal biosafety level-4 (ABSL-4) suit laboratory to the ABSL-4 cabinet laboratory is a crucial component for successful experimentation. For smooth study execution, establishing a communication network, moving equipment and subjects, and setting up and placing equipment, requires staff members to meticulously plan procedures prior to study initiation. Here, we provide an overview and a visual representation of how aerobiology research is conducted at the National Institutes of Health, National Institute of Allergy and Infectious Diseases Integrated Research Facility at Fort Detrick, Maryland, USA, within an ABSL-4 environment.

  14. Frozen dispersions of nanomaterials are a useful operational procedure in nanotoxicology.

    Science.gov (United States)

    Vila, Laura; Rubio, Laura; Annangi, Balasubramanyam; García-Rodríguez, Alba; Marcos, Ricard; Hernández, Alba

    2017-02-01

    The variability observed in nanoparticle (NP) dispersions can affect the reliability of the results obtained in short-term tests, and mainly in long-term experiments. In addition, obtaining a good dispersion is time-consuming and acts as a bottleneck in the development of high-throughput screening methodologies. The freezing of different aliquots from a stock dispersion would overcome such limitations, but no studies have explored the impact of freezing thawing the samples on the physico-chemical and biological properties of the nanomaterial (NM). This work aims to compare fresh-prepared and frozen MWCNT, ZnO-, Ag-, TiO 2- and CeO 2 -NP dispersions, used as models. NP characterization (size and morphology by TEM), hydrodynamic size and zeta potential were performed. Viability comparisons were determined in BEAS-2B cells. Cellular NP uptake and induced ROS production was assessed by TEM and flow cytometry, respectively. The obtained results show no important differences between frozen and fresh NP in their physico-chemical characteristics or their biological effects. This study is the first to demonstrate that there is no scientific evidence to dismiss the use of frozen NP, opening the door to the development of short- and long-term experiments with higher consistency, accuracy and reproducibility in a much shorter time and using a simplified procedure.

  15. Virtual reality in simulation of operational procedures in radioactive waste deposits

    International Nuclear Information System (INIS)

    Freitas, Victor Goncalves Gloria

    2016-01-01

    One of the biggest problems in the nuclear area are still the radioactive waste generated in the various applications of this form of energy, all these tailings are stored in warehouses that often are monitored and restructured for better allocation of then. These tailings are stored until it is safe to release into the environment. This work presents a methodology based on virtual reality, for the development of virtual deposits of radioactive waste in order to enable virtual simulations in these deposits. As application will be developed virtually the nuclear waste repository located at the Institute of Nuclear Engineering IEN/CNEN. The development of a virtual warehouse, more specifically, makes it possible to simulate/train the allocation and reallocation of materials with low and medium level of radioactivity, seen the possibility of locomotion of virtual objects and dynamic calculation of the rate of radiation in this environment. Using this methodology it also possible know the accumulated dose, by the virtual character, during the procedures run in the virtual environment. (author)

  16. Optimal space-energy splitting in MCNP with the DSA

    International Nuclear Information System (INIS)

    Dubi, A.; Gurvitz, N.

    1990-01-01

    The Direct Statistical Approach (DSA) particle transport theory is based on the possibility of obtaining exact explicit expressions for the dependence of the second moment and calculation time on the splitting parameters. This allows the automatic optimization of the splitting parameters by ''learning'' the bulk parameters from which the problem dependent coefficients of the quality function (second moment time) are constructed. The above procedure was exploited to implement an automatic optimization of the splitting parameters in the Monte Carlo Neutron Photon (MCNP) code. This was done in a number of steps. In the first instance, only spatial surface splitting was considered. In this step, the major obstacle has been the truncation of an infinite series of ''products'' of ''surface path's'' leading from the source to the detector. Encouraging results from the first phase led to the inclusion of full space/energy phase space splitting. (author)

  17. Operator's and insurer's relationship with social security organizations in the course of individual damage compensation procedures

    International Nuclear Information System (INIS)

    Deprimoz, Jacques.

    1995-01-01

    The Paris and Vienna Conventions internationally agreeded that health care and hospitalization guarantee and disability pension or death due to victim's outside the nuclear installations, as well as the organization funds contributions should be fixed by the internal rights of each Signatory Part. The present study, applicable to nine countries (Germany, Belgium, Brazil, France, Italy, Low Countries, United Kingdom, Sweden and Switzerland) sets up that the social security levels are more or less high and that the charges contributions could be important in countries under subrogation, even reduced or null in countries under imputation. In cases of transfrontier accidents, the contributions extension relies on harmonized rights with the social security organizations of victim's countries. Each indenominity victim's dossier could take a long time. The study concludes that the regulatory services of the social security organizations and their responsible operators or substitutes insurers should coordinate their interventions by using the information system

  18. Innominate artery injury: a catastrophic complication of tracheostomy, operative procedure revisited.

    Science.gov (United States)

    Maruti Pol, Manjunath; Gupta, Amit; Kumar, Subodh; Mishra, Biplab

    2014-04-03

    A patient presented with profuse bleeding from the oronasal cavity following orofaciomaxillary trauma associated with tracheolaryngeal injury and suspected cervical-spine injury due to collapse of a wall on the face, neck and upper chest. The patient was gasping, coughing blood and was unable to speak. Threatened airway was diagnosed. Inability to maintain oxygenation on cricothyroidotomy, forced emergency department surgeons to shift the patient to the operating room for definitive airway. During tracheostomy a major vessel was injured. Application of vascular clamp in the event of achieving haemostasis resulted in disappearance of saturation and pulse in the right upper limb, thus we suspected innominate artery (IA) injury. High tracheostomy performed and endotracheal tube passed into the trachea after removing clot and overcoming compromised narrow tracheal lumen. The injured IA was repaired and the patient survived for 14 days. On postoperative day 14 he died following profound bleeding into the tracheobronchial tree and asphyxia/apnoea. Tracheoinnominate artery fistula was detected at autopsy.

  19. Strategic environmental assessment and national development plans in Turkey: Towards legal framework and operational procedure

    International Nuclear Information System (INIS)

    Say, Nuriye Peker; Yuecel, Muzaffer

    2006-01-01

    National development plans were started to be prepared in Turkey in 1963. These plans are mandatory for public investments and guiding principles for private investments. They have a quality which guides and sets objectives for other plans in the country. Therefore, they can be evaluated as the main reason of successes and failures of sectoral investments or the problems that they cause directly or indirectly. Turkey is undergoing rapid industrialization, urbanization and population growth, thus environmental problems are on the increase. Although Environmental Impact Assessment (EIA) has been applied to individual investments in Turkey since 1993, natural environment has continued to be affected because of human activities. Today, parallel to the developments in the world, it has been discussed that it is necessary to strengthen project-level Environmental Assessment (EA) and to practice Strategic Environmental Assessment (SEA). The interest in SEA, that is, EA at the level of proposed policies, plans and programs has grown significantly since 2000 in the country. Discussions and preparations have started about regulation which provides the legal and institutional framework for SEA in The Ministry of Environment and Forestry. However, since the scientific approach into the subject is very new in Turkey, it will take time to answer the questions about how and in what fields to practice. This research project aims at analyzing the possible practice opportunities of SEA in Turkey and the practicability of SEA into the National Five-Year Development Plan (FYDP) which is assumed at the highest level of planning hierarchy in the country. The research is conducted on two sections. In the first section, procedural approaches to SEA on national development plans are investigated and a framework for these approaches is adapted at the institutional level. In the second section, SEA form for energy sector in the development plans is developed. In this article, the findings

  20. Steps forward in plant operation. From guidelines to a well-structured, usable and maintainable procedure system

    International Nuclear Information System (INIS)

    Forzano, P.; Castagna, P.

    1998-01-01

    The know-how of plant operation, in normal or emergency situations, and maintenance, is typically written in the form of guidelines. Although technical literature is structured in chapters and paragraphs, this type of formalization is still to the level of a 'good practice'. It is informal and subject to individual ability and competence. For many human activities that have intrinsically an high level of formalization, like procedures, it is advisable to analyze the formalism, to extract a set of rules from it, and to collect all the rules in a standard, that should be applicable to a range of specific situations. This papers presents DIAM, a methodology and a tool for procedure management, inspired by practical day-by-day issues: it embeds drawing and documentation standards and offers some new features like automatic flow diagramming and the structuring of large diagrams into pages, the congruence of step names and line paths, and the automatic printout of the procedure book. The automation of many activities offered by DIAM leads to a dramatic reduction in time for drawing productions and think document management in a completely new mode, allowing to abandon the old era of document patching and opening the new era of top quality drawings. (author)

  1. Support in the development of Regulatory Procedures for licensing Lepse Waste Management Operations

    International Nuclear Information System (INIS)

    2001-05-01

    This report describes a project intended to assist Gosatomnadzor of Russia develop a set of documents defining the regulatory requirements for information to be submitted to Gosatomnadzor in support of any application for a licence relating to the removal of spent nuclear fuel from the depot ship Lepse. The project resulted in the development of three regulatory documents covering the documentation required in support of a licence application, the requirements for quality assurance arrangements and the safety analysis report. The working method adopted involved staged development of draft material and review at workshops involving a wide variety of relevant Russian and western organizations. The input and output of the workshops was fully documented to provide an audit trail for the document development and the rationale for what has been included and what is excluded and why. The availability of the regulatory documents in English should significantly assist in the use of the documents by western partners in the actual industrial project. Important experience and information was exchanged among participants in the project. The developing understanding is an important element in providing confidence, from a western perspective, that appropriate regulatory supervision can be applied to industrial projects supported by organizations such as the European Commission and national agencies. The same working methods could be used in the next phase of Lepse regulatory support, i.e., support in development of the procedures for the regulatory review of licence applications, and, subsequently, support in the application of the regulatory inspection process to ensure licence conditions are being complied with. Similarly, these working methods could be used in providing regulatory support for nuclear and radiation safety related to other industrial projects involving radioactive waste management. The participants in this sub-project described in this report were Norwegian

  2. TVT-Secur (Hammock) versus TVT-Obturator: a randomized trial of suburethral sling operative procedures.

    Science.gov (United States)

    Hota, Lekha S; Hanaway, Katherine; Hacker, Michele R; Disciullo, Anthony; Elkadry, Eman; Dramitinos, Patricia; Shapiro, Alexander; Ferzandi, Tanaz; Rosenblatt, Peter L

    2012-01-01

    This study aimed to compare TVT-Secur (TVT-S) and TVT-Obturator (TVT-O) suburethral slings for treatment of stress urinary incontinence (SUI). This was a single-center, nonblinded, randomized trial of women with SUI who were randomized to TVT-S or TVT-O from May 2007 to April 2009. The primary outcome, SUI on cough stress test (CST), and quality-of-life and symptom questionnaires (Pelvic Floor Distress Inventory [PFDI-20] and Pelvic Floor Impact Questionnaire [PFIQ-7]) were assessed at 12 weeks and 1 year. Forty-three women were randomized to TVT-S and 44 to TVT-O. There were no differences in median baseline PFDI-20 and PFIQ-7. Twenty-two (52.4%) of 42 participants randomized to TVT-S had a positive CST result at evaluation after 12 weeks or 1 year, whereas 4 (9.1%) of the 44 in the TVT-O group had a positive CST result. The intent-to-treat analysis showed that the risk of a positive CST result was 6 times higher after TVT-S than TVT-O (risk ratio, 6.0; 95% confidence interval [CI], 2.3-16.0). Among women not lost to follow-up, the risk ratio for a positive CST result after TVT-S compared with TVT-O was 17.9 (95% CI, 2.5-128.0) at 12 weeks and 3.5 (95% CI, 1.1-11.0) at 1 year. Both TVT-S and TVT-O resulted in improved quality of life and symptoms at 12 weeks. There was no difference between the groups for PFDI-20 (P = 0.40) or PFIQ-7 (P = 0.43). A similar pattern was seen at 1 year (P = 0.85 and P = 0.36). The TVT-S seems to have a higher risk of positive postoperative CST result; however, the procedures result in similar improvements in quality of life and symptoms.

  3. Colloidal Fouling of Nanofiltration Membranes: Development of a Standard Operating Procedure

    Directory of Open Access Journals (Sweden)

    Md Abdullaha Al Mamun

    2017-01-01

    Full Text Available Fouling of nanofiltration (NF membranes is the most significant obstacle to the development of a sustainable and energy-efficient NF process. Colloidal fouling and performance decline in NF processes is complex due to the combination of cake formation and salt concentration polarization effects, which are influenced by the properties of the colloids and the membrane, the operating conditions of the test, and the solution chemistry. Although numerous studies have been conducted to investigate the influence of these parameters on the performance of the NF process, the importance of membrane preconditioning (e.g., compaction and equilibrating with salt water, as well as the determination of key parameters (e.g., critical flux and trans-membrane osmotic pressure before the fouling experiment have not been reported in detail. The aim of this paper is to present a standard experimental and data analysis protocol for NF colloidal fouling experiments. The developed methodology covers preparation and characterization of water samples and colloidal particles, pre-test membrane compaction and critical flux determination, measurement of experimental data during the fouling test, and the analysis of that data to determine the relative importance of various fouling mechanisms. The standard protocol is illustrated with data from a series of flat sheet, bench-scale experiments.

  4. Effect of the video output of the dental operating microscope on anxiety levels in a pediatric population during restorative procedures

    Directory of Open Access Journals (Sweden)

    Abrar Sayed

    2016-01-01

    Full Text Available Background: Adapting a child to the alien settings of a dental operatory is a major challenge to the dentist. Fear of the unknown and preconceived notions of dental pain causes anxiety in the pediatric patient. This often leads to disruptive and uncooperative behavior in the dental operatory. Many methods of behavior management have been described, of which the Tell-Show-Do (TSD is an established and time-tested technique of behavior management. Aim: To determine if a live visual output of the dental operating microscope (DOM could be used as an adjunct to the TSD technique, to involve the child more completely in the procedure and reduce the fear of the unknown. Materials and Methods: The study was a randomized, controlled, crossover, and cross-sectional clinical trial. Data were obtained from two visits. 90 children having carious lesions on both lower first molars, in the 7-9 years age group were selected and divided randomly into two groups. Restorative procedures were performed on one tooth per visit, with visits 1 week apart. Live display of the procedure was shown to the patient using video output of the DOM displayed on a 72 inch LCD monitor, angled for best visibility of the child. Anxiety levels were evaluated using Venhams picture selection test and pulse oximetry. Statistical Analysis: Student′s t-test was used to compare the anxiety scores obtained from the two groups. Results: The results showed there was a decrease in the anxiety from the first visit to the second visit. (P = 0.05 for Group A and P = 0.003 for Group B. The patients preferred the visit in which the DOM was used. The operator reported an increased patient compliance and reduced patient movement in the visits in which the DOM was used. Conclusion: There is a reduction in anxiety from the first visit to the second visit for restorative treatment when the DOM is used.

  5. Effect of the video output of the dental operating microscope on anxiety levels in a pediatric population during restorative procedures.

    Science.gov (United States)

    Sayed, Abrar; Ranna, Vinisha; Padawe, Dimple; Takate, Vilas

    2016-01-01

    Adapting a child to the alien settings of a dental operatory is a major challenge to the dentist. Fear of the unknown and preconceived notions of dental pain causes anxiety in the pediatric patient. This often leads to disruptive and uncooperative behavior in the dental operatory. Many methods of behavior management have been described, of which the Tell-Show-Do (TSD) is an established and time-tested technique of behavior management. To determine if a live visual output of the dental operating microscope (DOM) could be used as an adjunct to the TSD technique, to involve the child more completely in the procedure and reduce the fear of the unknown. The study was a randomized, controlled, crossover, and cross-sectional clinical trial. Data were obtained from two visits. 90 children having carious lesions on both lower first molars, in the 7-9 years age group were selected and divided randomly into two groups. Restorative procedures were performed on one tooth per visit, with visits 1 week apart. Live display of the procedure was shown to the patient using video output of the DOM displayed on a 72 inch LCD monitor, angled for best visibility of the child. Anxiety levels were evaluated using Venhams picture selection test and pulse oximetry. Student's t-test was used to compare the anxiety scores obtained from the two groups. The results showed there was a decrease in the anxiety from the first visit to the second visit. (P = 0.05 for Group A and P = 0.003 for Group B). The patients preferred the visit in which the DOM was used. The operator reported an increased patient compliance and reduced patient movement in the visits in which the DOM was used. There is a reduction in anxiety from the first visit to the second visit for restorative treatment when the DOM is used.

  6. Bad split during bilateral sagittal split osteotomy of the mandible with separators: a retrospective study of 427 patients.

    Science.gov (United States)

    Mensink, Gertjan; Verweij, Jop P; Frank, Michael D; Eelco Bergsma, J; Richard van Merkesteyn, J P

    2013-09-01

    An unfavourable fracture, known as a bad split, is a common operative complication in bilateral sagittal split osteotomy (BSSO). The reported incidence ranges from 0.5 to 5.5%/site. Since 1994 we have used sagittal splitters and separators instead of chisels for BSSO in our clinic in an attempt to prevent postoperative hypoaesthesia. Theoretically an increased percentage of bad splits could be expected with this technique. In this retrospective study we aimed to find out the incidence of bad splits associated with BSSO done with splitters and separators. We also assessed the risk factors for bad splits. The study group comprised 427 consecutive patients among whom the incidence of bad splits was 2.0%/site, which is well within the reported range. The only predictive factor for a bad split was the removal of third molars at the same time as BSSO. There was no significant association between bad splits and age, sex, class of occlusion, or the experience of the surgeon. We think that doing a BSSO with splitters and separators instead of chisels does not increase the risk of a bad split, and is therefore safe with predictable results. Copyright © 2012 The British Association of Oral and Maxillofacial Surgeons. Published by Elsevier Ltd. All rights reserved.

  7. Geometrical splitting in Monte Carlo

    International Nuclear Information System (INIS)

    Dubi, A.; Elperin, T.; Dudziak, D.J.

    1982-01-01

    A statistical model is presented by which a direct statistical approach yielded an analytic expression for the second moment, the variance ratio, and the benefit function in a model of an n surface-splitting Monte Carlo game. In addition to the insight into the dependence of the second moment on the splitting parameters the main importance of the expressions developed lies in their potential to become a basis for in-code optimization of splitting through a general algorithm. Refs

  8. The development of a quantitative measure for the complexity of emergency tasks stipulated in emergency operating procedures of nuclear power plants

    International Nuclear Information System (INIS)

    Park, Jin Kyun; Jung, Won Dea

    2006-11-01

    Previous studies have continuously pointed out that human performance is a decisive factor affecting the safety of complicated process systems. Subsequently, as the result of extensive efforts, it has been revealed that the provision of procedures is one of the most effective countermeasures, especially if human operators have to carry out their tasks under a very stressful environment. That is, since good procedures are helpful to not only enhance the performance of human operators but also the reduction of the possibility of a human error through stipulating detailed tasks to be done by human operators. Ironically, it has been emphasized that the performance of human operators could be impaired due to complicated procedures, because procedures directly govern the physical as well as cognitive behavior of human operators by institutionalizing detailed actions. Therefore, it is a prerequisite to develop a systematic framework that properly evaluate the complexity of tasks described in procedures. For this reason, a measure called TACOM (Task Complexity) that can quantify the complexity of emergency tasks described in the emergency operating procedures (EOPs) of NPPs has been developed. In this report, a technical background as well as practical steps to quantify the complexity of tasks were presented with a series of studies that were conducted to ensure the validity of the TACOM measure. As a result of validation studies, since it is shown that the TACOM measure seem to properly quantify the complexity of emergency tasks, it is desirable that the TACOM measure plays an important role in improving the performance of human operators

  9. The development of a quantitative measure for the complexity of emergency tasks stipulated in emergency operating procedures of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jin Kyun; Jung, Won Dea

    2006-11-15

    Previous studies have continuously pointed out that human performance is a decisive factor affecting the safety of complicated process systems. Subsequently, as the result of extensive efforts, it has been revealed that the provision of procedures is one of the most effective countermeasures, especially if human operators have to carry out their tasks under a very stressful environment. That is, since good procedures are helpful to not only enhance the performance of human operators but also the reduction of the possibility of a human error through stipulating detailed tasks to be done by human operators. Ironically, it has been emphasized that the performance of human operators could be impaired due to complicated procedures, because procedures directly govern the physical as well as cognitive behavior of human operators by institutionalizing detailed actions. Therefore, it is a prerequisite to develop a systematic framework that properly evaluate the complexity of tasks described in procedures. For this reason, a measure called TACOM (Task Complexity) that can quantify the complexity of emergency tasks described in the emergency operating procedures (EOPs) of NPPs has been developed. In this report, a technical background as well as practical steps to quantify the complexity of tasks were presented with a series of studies that were conducted to ensure the validity of the TACOM measure. As a result of validation studies, since it is shown that the TACOM measure seem to properly quantify the complexity of emergency tasks, it is desirable that the TACOM measure plays an important role in improving the performance of human operators.

  10. Mobile Computerized Procedure System for the Improved Situation Awareness among Field Workers and Main Control Room Operators

    International Nuclear Information System (INIS)

    Lee, Sungjin; Seong, Nokyu; Jung, Yeonsub

    2013-01-01

    This paper explains the technical issues of the mobile CPS (m-CPS) in the conceptual development stage. The proposed m-CPS can be developed with many recent technologies in the various industry fields based on CRI CPS. Performance and stability of CRI CPS have been tested several times until now. It is expected that more human errors can be reduced by the m-CPS through improved situation awareness and human performance tools for local workers and MCR operators. Some considerations as well as mentioned ones will be reflected in the m-CPS development. Human errors can occur during the test and maintenance of the generator, safety injection system and reactor coolant inventory in nuclear power plants (NPPs). Most of human errors have been occurred by the omission of the prevention techniques such as the self-check, the peer-check, the concurrent verification and etc. Another important reason is the insufficient information sharing among main control room (MCR) operators and field workers. Various field service automation tools have been developed with recent information technology in many countries. APR1400 computerized procedure system (CPS) has been developed for the MCR operators of Shin-Kori 3 and 4 units. Especially, the concurrent verification support design is applied in the construction project of Shin-Hanul 1 and 2 CPS. KHNP central research institute (CRI) expects that the extended application of CPS including the field activity, that is a kind of mobile CPS, can enhance the reduction of human errors

  11. 40 CFR 60.4212 - What test methods and other procedures must I use if I am an owner or operator of a stationary CI...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What test methods and other procedures... Requirements for Owners and Operators § 60.4212 What test methods and other procedures must I use if I am an... CFR 94.8, as applicable, must not exceed the NTE numerical requirements, rounded to the same number of...

  12. Standard Operating Procedure for the Grinding and Extraction of Lead in Paint using Nitric Acid and a Rotor/Stator System Powered by a High Speed Motor

    Science.gov (United States)

    This Standard Operating Procedure (SOP) describes a new, rapid, and relatively inexpensive one step procedure which grinds the paint samples removed from the substrate and simultaneously quantitatively extracts the Pb from the paint in only one step in preparation for quantitativ...

  13. Meshed split skin graft for extensive vitiligo

    Directory of Open Access Journals (Sweden)

    Srinivas C

    2004-05-01

    Full Text Available A 30 year old female presented with generalized stable vitiligo involving large areas of the body. Since large areas were to be treated it was decided to do meshed split skin graft. A phototoxic blister over recipient site was induced by applying 8 MOP solution followed by exposure to UVA. The split skin graft was harvested from donor area by Padgett dermatome which was meshed by an ampligreffe to increase the size of the graft by 4 times. Significant pigmentation of the depigmented skin was seen after 5 months. This procedure helps to cover large recipient areas, when pigmented donor skin is limited with minimal risk of scarring. Phototoxic blister enables easy separation of epidermis thus saving time required for dermabrasion from recipient site.

  14. Isospin breaking in octet baryon mass splittings

    Energy Technology Data Exchange (ETDEWEB)

    Horsley, R. [Edinburgh Univ. (United Kingdom). School of Physics and Astronomy; Najjar, J. [Regensburg Univ. (Germany). Institut fuer Theoretische Physik; Nakamura, Y. [RIKEN Advanced Institute for Computational Science, Kobe, Hyogo (Japan); Pleiter, D. [Forschungszentrum Juelich (Germany). Juelich Supercomputer Centre; Rakow, P.E.L. [Liverpool Univ. (United Kingdom). Theoretical Physics Division; Schierholz, G. [Deutsches Elektronen-Synchrotron (DESY), Hamburg (Germany); Zanotti, J.M. [Adelaide Univ., SA (Australia). CSSM, School of Chemistry and Physics

    2012-06-15

    Using an SU(3) flavour symmetry breaking expansion in the quark mass, we determine the QCD component of the nucleon, Sigma and Xi mass splittings of the baryon octet due to up-down (and strange) quark mass differences in terms of the kaon mass splitting. Provided the average quark mass is kept constant, the expansion coefficients in our procedure can be determined from computationally cheaper simulations with mass degenerate sea quarks and partially quenched valence quarks. Both the linear and quadratic terms in the SU(3) flavour symmetry breaking expansion are considered; it is found that the quadratic terms only change the result by a few percent, indicating that the expansion is highly convergent.

  15. Optimizing TCP Performance over UMTS with Split TCP Proxy

    DEFF Research Database (Denmark)

    Hu, Liang; Dittmann, Lars

    2009-01-01

    . To cope with large delay bandwidth product, we propose a novel concept of split TCP proxy which is placed at GGSN between UNITS network and Internet. The split proxy divides the bandwidth delay product into two parts, resulting in two TCP connections with smaller bandwidth delay products which can...... be pipelined and thus operating at higher speeds. Simulation results show, the split TCP proxy can significantly improve the TCP performance in terms of RLC throughput under high bit rate DCH channel scenario (e.g.256 kbps). On the other hand, it only brings small performance improvement under low bit rate DCH...... scenario (e.g.64 kbps). Besides, the split TCP proxy brings more performance gain for downloading large files than downloading small ones. To the end, for the configuration of the split proxy, an aggressive initial TCP congestion window size (e.g. 10 MSS) at proxy is particularly useful for radio links...

  16. Design of standard operating procedure production proceses (case study on the home industry Bedugul Baturiti Tabanan Bali)

    Science.gov (United States)

    Kasiani; Suhantono, Djoko; Mirah Kencanawati, AAA

    2018-01-01

    Candikuning is part of the district of Baturiti, tourism village, better known by the name of Bedugul. No less interesting is the variety of chips produced by two partner groups as a souvenir after the tour, such as Chips: Spinach; beans; Tempeh. The purpose of this research were to design a Standard Operating Procedure (SOP): Production Processes on the Home Industry Bedugul Baturiti Tabanan Bali. The data technic collected use: observation; Documentation; and then interview to collect information. The data analysis technic done by using the Miles & Huberman. Result this research that the draft SOP: Production Processes Chips (Menu). The conclusion in this research SOP Production Processes use with flowchart and description on the Home Industry Bedugul Baturiti Tabanan Bali.

  17. Virtual reality, augmented reality, and robotics applied to digestive operative procedures: from in vivo animal preclinical studies to clinical use

    Science.gov (United States)

    Soler, Luc; Marescaux, Jacques

    2006-04-01

    Technological innovations of the 20 th century provided medicine and surgery with new tools, among which virtual reality and robotics belong to the most revolutionary ones. Our work aims at setting up new techniques for detection, 3D delineation and 4D time follow-up of small abdominal lesions from standard mecial images (CT scsan, MRI). It also aims at developing innovative systems making tumor resection or treatment easier with the use of augmented reality and robotized systems, increasing gesture precision. It also permits a realtime great distance connection between practitioners so they can share a same 3D reconstructed patient and interact on a same patient, virtually before the intervention and for real during the surgical procedure thanks to a telesurgical robot. In preclinical studies, our first results obtained from a micro-CT scanner show that these technologies provide an efficient and precise 3D modeling of anatomical and pathological structures of rats and mice. In clinical studies, our first results show the possibility to improve the therapeutic choice thanks to a better detection and and representation of the patient before performing the surgical gesture. They also show the efficiency of augmented reality that provides virtual transparency of the patient in real time during the operative procedure. In the near future, through the exploitation of these systems, surgeons will program and check on the virtual patient clone an optimal procedure without errors, which will be replayed on the real patient by the robot under surgeon control. This medical dream is today about to become reality.

  18. Survival Prediction in Patients Undergoing Open-Heart Mitral Valve Operation After Previous Failed MitraClip Procedures.

    Science.gov (United States)

    Geidel, Stephan; Wohlmuth, Peter; Schmoeckel, Michael

    2016-03-01

    The objective of this study was to analyze the results of open heart mitral valve operations for survival prediction in patients with previously unsuccessful MitraClip procedures. Thirty-three consecutive patients who underwent mitral valve surgery in our institution were studied. At a median of 41 days, they had previously undergone one to five futile MitraClip implantations. At the time of their operations, patients were 72.6 ± 10.3 years old, and the calculated risk, using the European System for Cardiac Operative Risk Evaluation (EuroSCORE) II, was a median of 26.5%. Individual outcomes were recorded, and all patients were monitored postoperatively. Thirty-day mortality was 9.1%, and the overall survival at 2.2 years was 60.6%. Seven cardiac-related and six noncardiac deaths occurred. Univariate survival regression models demonstrated a significant influence of the following variables on survival: EuroSCORE II (p = 0.0022), preoperative left ventricular end-diastolic dimension (p = 0.0052), left ventricular ejection fraction (p = 0.0249), coronary artery disease (p = 0.0385), and severe pulmonary hypertension (p = 0.0431). Survivors showed considerable improvements in their New York Heart Association class (p < 0.0001), left ventricular ejection fraction (p = 0.0080), grade of mitral regurgitation (p = 0.0350), and mitral valve area (p = 0.0486). Survival after mitral repair was not superior to survival after replacement. Indications for surgery after failed MitraClip procedures must be considered with the greatest of care. Variables predicting postoperative survival should be taken into account regarding the difficult decision as to whether to operate or not. Our data suggest that replacement of the pretreated mitral valve is probably the more reasonable concept rather than complex repairs. When the EuroSCORE II at the time of surgery exceeds 30%, conservative therapy is advisable. Copyright © 2016 The Society of Thoracic Surgeons. Published by Elsevier Inc

  19. Standard operating procedures for pre-analytical handling of blood and urine for metabolomic studies and biobanks.

    Science.gov (United States)

    Bernini, Patrizia; Bertini, Ivano; Luchinat, Claudio; Nincheri, Paola; Staderini, Samuele; Turano, Paola

    2011-04-01

    (1)H NMR metabolic profiling of urine, serum and plasma has been used to monitor the impact of the pre-analytical steps on the sample quality and stability in order to propose standard operating procedures (SOPs) for deposition in biobanks. We analyzed the quality of serum and plasma samples as a function of the elapsed time (t = 0-4 h) between blood collection and processing and of the time from processing to freezing (up to 24 h). The stability of the urine metabolic profile over time (up to 24 h) at various storage temperatures was monitored as a function of the different pre-analytical treatments like pre-storage centrifugation, filtration, and addition of the bacteriostatic preservative sodium azide. Appreciable changes in the profiles, reflecting changes in the concentration of a number of metabolites, were detected and discussed in terms of chemical and enzymatic reactions for both blood and urine samples. Appropriate procedures for blood derivatives collection and urine preservation/storage that allow maintaining as much as possible the original metabolic profile of the fresh samples emerge, and are proposed as SOPs for biobanking.

  20. Standard operating procedures for pre-analytical handling of blood and urine for metabolomic studies and biobanks

    International Nuclear Information System (INIS)

    Bernini, Patrizia; Bertini, Ivano; Luchinat, Claudio; Nincheri, Paola; Staderini, Samuele; Turano, Paola

    2011-01-01

    1 H NMR metabolic profiling of urine, serum and plasma has been used to monitor the impact of the pre-analytical steps on the sample quality and stability in order to propose standard operating procedures (SOPs) for deposition in biobanks. We analyzed the quality of serum and plasma samples as a function of the elapsed time (t = 0−4 h) between blood collection and processing and of the time from processing to freezing (up to 24 h). The stability of the urine metabolic profile over time (up to 24 h) at various storage temperatures was monitored as a function of the different pre-analytical treatments like pre-storage centrifugation, filtration, and addition of the bacteriostatic preservative sodium azide. Appreciable changes in the profiles, reflecting changes in the concentration of a number of metabolites, were detected and discussed in terms of chemical and enzymatic reactions for both blood and urine samples. Appropriate procedures for blood derivatives collection and urine preservation/storage that allow maintaining as much as possible the original metabolic profile of the fresh samples emerge, and are proposed as SOPs for biobanking.