Sample records for sluicing construction specification

  1. Project W-320, 241-C-106 sluicing: Construction specification W-320-C2

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits

  2. Project W-320, 241-C-106 sluicing: Construction specification W-320-C2

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-07-20

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits.

  3. Project W-320, 241-C-106 sluicing: Construction specification W-320-C6

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits

  4. Project W-320, 241-C-106 sluicing: Construction specification W-320-C5

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits

  5. Project W-320, 241-C-106 sluicing: Construction specification W-320-C7

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits

  6. Project W-320, 241-C-106 sluicing: Construction specification W-320-C5

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-07-20

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits.

  7. Project W-320, 241-C-106 sluicing: Construction specification W-320-C7

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-07-20

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits.

  8. Project W-320, 241-C-106 sluicing: Construction specification W-320-C6

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-07-20

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits.

  9. Antecedent Selection for Sluicing

    DEFF Research Database (Denmark)

    Anand, Pranav; Hardt, Daniel

    2016-01-01

    Sluicing is an elliptical process where the majority of a question can go unpronounced as long as there is a salient antecedent in previous discourse. This paper considers the task of antecedent selection: finding the correct antecedent for a given case of sluicing. We argue that both syntactic...... and discourse relationships are important in antecedent selection, and we construct linguistically sophisticated features that describe the relevant relationships. We also define features that describe the relation of the content of the antecedent and the sluice type. We develop a linear model which achieves...... accuracy of 72.4%, a substantial improvement over a strong manually constructed baseline. Feature analysis confirms that both syntactic and discourse features are important in antecedent selection....

  10. Project W-320, 241-C-106 sluicing: Construction specification W-320-C1

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits

  11. The gelsluice, an innovative idea for the present sluice structures

    Directory of Open Access Journals (Sweden)

    de Gijt Jacob Gerrit (Jarit

    2017-01-01

    Full Text Available Sluices have been built worldwide since in 984 when the first sluice was built in China to speed up the operations in the Grand canal. Since that time different types of sluices have been developed world wide both in size and material use and their own shipping and structural characteristics. One of the main drawbacks of the present sluice designs is the waiting time. This problem of the waiting time is in principle overcome by the design of the gelsluice (gellock. This paper describe the development of sluices construction in general and with the emphasis on the characteristics of the innovative gelsluice. A preliminary design of the gelsluice will be discussed and presented. Finally some recommendations are presented for further research to improve the design of the gelsluice.

  12. Nonradioactive air emissions notice of construction, Project W-320, 241-C-106 tank sluicing

    International Nuclear Information System (INIS)

    Hays, C.B.

    1998-01-01

    This document serves as a Notice of Construction for the Phase 2 activities of Project W-320, 241-C-106 Tank Sluicing, pursuant to the requirements of Washington Administrative Codes (WAC) 173-400 and 173-460. Phased permitting for Project W-320 was discussed with the Washington State Department of Ecology (Ecology) on November 2, 1993. In April 1994, it was deemed unnecessary because the Phase 1 activities did not constitute a new source of emissions and therefore did not require approval from Ecology. The 241-C-106 tank is a 2-million liter capacity, single-shell tank (SST) used for radioactive waste storage since 1947. Between mid-1963 and mid-1969, 241-C-106 tank received high-heat waste, PUREX (plutonium-uranium extraction) Facility high-level waste, and strontium-bearing solids from the strontium and cesium recovery activities. In 1971, temperatures exceeding 99 C were observed in the tank, and therefore, a ventilation system was installed to cool the tank. In addition, approximately 22,712 liters of cooling water are added to the tank each month to prevent the sludge from drying out and overheating. Excessive drying of the sludge could result in possible structural damage. The current radiolytic heat generation rate has been calculated at 32 kilowatts (kW) plus or minus 6 kW. The 241-C-106 tank was withdrawn from service in 1979 and currently is categorized as not leaking. The heat generation in 241-C-106 tank has been identified as a key safety issue on the Hanford Site. The evaporative cooling provided by the added water during operation and/or sluicing maintains the 241-C-106 tank within its specified operating temperature limits. Project W-320, 241-C-106 Tank Sluicing, will mobilize and remove the heat-generating sludge, allowing the water additions to cease. Following sludge removal, the 241-C-106 tank could be placed in a safe, interim stabilized condition. Tank-to-tank sluicing, an existing, proven technology, will provide the earliest possible

  13. Nonradioactive air emissions notice of construction, Project W-320, 241-C-106 tank sluicing

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1998-01-28

    This document serves as a Notice of Construction for the Phase 2 activities of Project W-320, 241-C-106 Tank Sluicing, pursuant to the requirements of Washington Administrative Codes (WAC) 173-400 and 173-460. Phased permitting for Project W-320 was discussed with the Washington State Department of Ecology (Ecology) on November 2, 1993. In April 1994, it was deemed unnecessary because the Phase 1 activities did not constitute a new source of emissions and therefore did not require approval from Ecology. The 241-C-106 tank is a 2-million liter capacity, single-shell tank (SST) used for radioactive waste storage since 1947. Between mid-1963 and mid-1969, 241-C-106 tank received high-heat waste, PUREX (plutonium-uranium extraction) Facility high-level waste, and strontium-bearing solids from the strontium and cesium recovery activities. In 1971, temperatures exceeding 99 C were observed in the tank, and therefore, a ventilation system was installed to cool the tank. In addition, approximately 22,712 liters of cooling water are added to the tank each month to prevent the sludge from drying out and overheating. Excessive drying of the sludge could result in possible structural damage. The current radiolytic heat generation rate has been calculated at 32 kilowatts (kW) plus or minus 6 kW. The 241-C-106 tank was withdrawn from service in 1979 and currently is categorized as not leaking. The heat generation in 241-C-106 tank has been identified as a key safety issue on the Hanford Site. The evaporative cooling provided by the added water during operation and/or sluicing maintains the 241-C-106 tank within its specified operating temperature limits. Project W-320, 241-C-106 Tank Sluicing, will mobilize and remove the heat-generating sludge, allowing the water additions to cease. Following sludge removal, the 241-C-106 tank could be placed in a safe, interim stabilized condition. Tank-to-tank sluicing, an existing, proven technology, will provide the earliest possible

  14. Classifying Sluice Occurrences in Dialogue

    DEFF Research Database (Denmark)

    Baird, Austin; Hamza, Anissa; Hardt, Daniel

    2018-01-01

    perform manual annotation with acceptable inter-coder agreement. We build classifier models with Decision Trees and Naive Bayes, with accuracy of 67%. We deploy a classifier to automatically classify sluice occurrences in OpenSubtitles, resulting in a corpus with 1.7 million occurrences. This will support....... Despite this, the corpus can be of great use in research on sluicing and development of systems, and we are making the corpus freely available on request. Furthermore, we are in the process of improving the accuracy of sluice identification and annotation for the purpose of created a subsequent version...

  15. Development of a Self-Sluicing Pressure Leaf Filter

    Science.gov (United States)

    Cousineau, Bernard L.; Lumsden, J. R.

    The cylindrical Kelly filter presses installed in the Ewarton Works "C" phase did not perform satisfactorily because of difficulties with head seals, locking rings, and shell retraction mechanisms. As rectification required major modifications, a concept of a press which did not require to be opened for sluicing was proposed. Test work of various sluicing and res lurrying spray arrangements was carried out, and this led to the design of a self-sluicing press which used the shell of an existing Kelly press with its main axis vertical. One press was converted by July 1972, and a development period started. Although initial operation was encouraging, effective sluicing could not be guaranteed after 30 shifts. Modifications to leaf spacing, spray rotational speed, spray slot width, feed pressure and pre-coat control by November 1973, however, allowed effective performance for all of the 800 hour canvas life. Advantages are: reduced operating and maintenance manpower, clean environment, and reduced maintenance cost. The use of 1st wash overflow for sluicing has reduced caustic soda and canvas consumption. Ewarton Works now has four converted self-sluicing presses, and arc converting five more, and Arvida Works plan the installation of one for tests on red pressing (blow-off filtration). A side benefit of the development was the study of the benefits of constant pressure overflow filtration.

  16. Descriptive models for single-jet sluicing of sludge waste

    International Nuclear Information System (INIS)

    Erian, F.F.; Mahoney, L.A.; Terrones, G.

    1997-12-01

    Mobilization of sludge waste stored in underground storage tanks can be achieved safely and reliably by sluicing. In the project discussed in this report, the waste in Hanford single-shell Tank 241-C-106 will be mobilized by sluicing, retrieved by a slurry retrieval pump, and transferred via an 1800-ft slurry pipeline to Tank 241-AY-102. A sluicing strategy must be developed that ensures efficient use of the deployed configuration of the sluicing system: the nozzle(s) and the retrieval pump(s). Given a sluicing system configuration in a particular tank, it is desirable to prescribe the sequential locations at which the sludge will be mobilized and retrieved and the rate at which these mobilization and retrieval processes take place. In addition, it is necessary to know whether the retrieved waste slurry meets the requirements for cross-site slurry transport. Some of the physical phenomena that take place during mobilization and retrieval and certain aspects of the sluicing process are described in this report. First, a mathematical model gives (1) an idealized geometrical representation of where, within the confines of a storage tank containing a certain amount of settled waste, sludge can be removed and mobilized; and (2) a quantitative measure of the amount of sludge that can be removed during a sluicing campaign. A model describing an idealized water jet issuing from a circular nozzle located at a given height above a flat surface is also presented in this report. This dynamic water-jet model provides the basis for improving the geometrical sluicing model presented next. In this model the authors assume that the water jet follows a straight trajectory toward a target point on a flat surface. However, the water jet does not follow a straight line in the actual tank, and using the true trajectory will allow a more accurate estimate of the amount of disturbed material. Also, the authors hope that developing accurate force and pressure fields will lead to a better

  17. Aerosol characteristics in the offgas from a pilot-scale sluicing operation

    International Nuclear Information System (INIS)

    Ligotke, M.W.; Whyatt, G.A.; Beckette, M.R.

    1995-01-01

    A pilot-scale study was performed to simulate conditions anticipated during sluicing operations to retrieve waste in single-shell Tank 241-C-106 at the US Department of Energy's Hanford Site in southeastern Washington. The objective of the study was to identify and characterize the potential aerosol source term at the inlet of the headspace exhaust ventilation system during sluicing operations. The information is needed to support decisions for components to be used in the full-scale operation. A secondary objective was to qualitatively evaluate the visibility during sluicing. Three simulated sluicing tests were performed in the 336 Building's quarter-scale waste tank facility located at Hanford. Scaling relationships were used to guide modifications to the quarter-scale tank to accommodate tests that simulated tank geometry, sluicing, and ventilation conditions in the full-scale tank. Simulated sluicing fluids were targeted on solid and liquid surfaces during the tests. Test conditions were monitored, and aerosol measurements were made in the offgas ventilation duct. Also during the tests, an in-tank camera was used to monitor visibility

  18. Aerosol characteristics in the offgas from a pilot-scale sluicing operation

    Energy Technology Data Exchange (ETDEWEB)

    Ligotke, M.W.; Whyatt, G.A.; Beckette, M.R.

    1995-01-01

    A pilot-scale study was performed to simulate conditions anticipated during sluicing operations to retrieve waste in single-shell Tank 241-C-106 at the US Department of Energy`s Hanford Site in southeastern Washington. The objective of the study was to identify and characterize the potential aerosol source term at the inlet of the headspace exhaust ventilation system during sluicing operations. The information is needed to support decisions for components to be used in the full-scale operation. A secondary objective was to qualitatively evaluate the visibility during sluicing. Three simulated sluicing tests were performed in the 336 Building`s quarter-scale waste tank facility located at Hanford. Scaling relationships were used to guide modifications to the quarter-scale tank to accommodate tests that simulated tank geometry, sluicing, and ventilation conditions in the full-scale tank. Simulated sluicing fluids were targeted on solid and liquid surfaces during the tests. Test conditions were monitored, and aerosol measurements were made in the offgas ventilation duct. Also during the tests, an in-tank camera was used to monitor visibility.

  19. Environmental management through sluice gated bed-dam: a revived strategy for the control of Anopheles fluviatilis breeding in streams

    Science.gov (United States)

    Sahu, S.S.; Gunasekaran, K.; Jambulingam, P.

    2014-01-01

    Background & objectives: Integrated vector management (IVM) emphasizes sustainable eco-friendly methods and minimal use of chemicals. In this context, the present study highlights the environmental control of breeding of Anopheles fluviatilis, the primary malaria vector, through water management in a natural stream in Koraput district, Odisha, India. Methods: The District Rural Development Agency (DRDA), Koraput, constructed two bed-dams across streams, one in Barigaon and the other in Pipalapodar village. The bed-dam in the former village was fitted with two sluice gates whereas the bed dam constructed in the latter village was without the sluice gate. The sluice gates were opened once in a week on a fixed day to flush out the water from the dam. Anopheles immatures were sampled systematically in the streams using a dipper for density measurement and species composition. Results: There was a reduction of 84.9 per cent in the proportion of positive dips for Anopheles larvae/pupae and a reduction of 98.4 per cent in immature density (number/dip) of An. fluviatilis in the experimental downstream compared to the control following opening of the sluice gates. Interpretation & conclusions: Our findins showed that opening of sluice gates of the bed-dam regularly once in a week resulted in the control of vector breeding in the downstream due to the flushing effect of the water released with a high flow from the bed-dam that stagnated water in the upstream. The outcome of the study encourages upscaling this measure to other areas, wherever feasible. PMID:25297364

  20. Waste retrieval sluicing system campaign number 1 solids volume transferred calculation

    International Nuclear Information System (INIS)

    BAILEY, J.W.

    1999-01-01

    This calculation has been prepared to document the volume of sludge removed from tank 241-C-106 during Waste Retrieval Sluicing System (WRSS) Sluicing Campaign No.1. This calculation will be updated, if necessary, to incorporate new data. This calculation supports the declaration of completion of WRSS Campaign No.1 and, as such, is also the documentation for completion of Performance Agreement TWR 1.2.1 , C-106 Sluicing Performance Expectations. It documents the performance of all the appropriate tank 241-C-106 mass transfer verifications, evaluations, and appropriate adjustments discussed in HNF-SD-WM-PROC-021, Chapter 23, ''Process Engineering Calculations for Tank 241-C-106 Sluicing and Retrieval''

  1. Waste retrieval sluicing system campaign number 1 solids volume transferred calculation

    International Nuclear Information System (INIS)

    BAILEY, J.W.

    1999-01-01

    This calculation has been prepared to document the volume of sludge removed from tank 241-C-106 during Waste Retrieval Sluicing System (WRSS) Sluicing Campaign No.1. This calculation will be updated, if necessary, to incorporate new data. This calculation supports the declaration of completion of WRSS Campaign No.1 and, as such, is also the documentation for completion of Performance Agreement TWR 1.2.1 C-106 Sluicing Performance Expectations. It documents the performance of all the appropriate tank 241-C-106 mass transfer verifications, evaluations, and appropriate adjustments discussed in HNF-SD-WM-PROC-021, Chapter 23, ''Process Engineering Calculations for Tank 241-C-106 Sluicing and Retrieval''

  2. Quantitative relations between chemical oxygen demand concentration and its influence factors in the sluice-controlled river reaches of Shaying River, China.

    Science.gov (United States)

    Dou, Ming; Li, Guiqiu; Li, Congying

    2015-01-01

    Recent research on the effects of dam and sluice construction on the water environment has attracted extensive attention from academia and governments alike. Because the operation of sluices greatly alters environmental factors such as water flow and sediment load, the water quality in sluice-controlled river reaches (SCRRs) undergoes complex changes compared with those in normal reaches. This work used river reaches near the Huaidian Sluice in Shaying River of China as a case study to analyse the effects of sluice operation on water quality evolution in SCRRs. The most influential factors affecting the rate of change in chemical oxygen demand (COD) concentration in SCRRs were identified through water quality monitoring experiments performed under various modes of sluice operation and by applying a statistical method 'partial correlation analysis'. Then, a hydrodynamic model incorporating sluice operation and a water quality transport and transform model incorporating the release of endogenous loads were developed. Using these two models, the processes of temporal and spatial change of COD concentrations in the SCRRs were simulated under various scenarios designed to represent the dominant factors of influence. Finally, the simulation results were used to develop empirical relationships between the rate of change in COD concentrations and the dominant factors of influence. The results reveal that three factors, i.e., water inflow concentration, gate opening size, and gate opening number, are the dominant factors of influence, and there are logarithmic relationships between the rate of change in COD concentration in the SCRRs and these factors.

  3. Identification of key factors affecting the water pollutant concentration in the sluice-controlled river reaches of the Shaying River in China via statistical analysis methods.

    Science.gov (United States)

    Dou, Ming; Zhang, Yan; Zuo, Qiting; Mi, Qingbin

    2015-08-01

    The construction of sluices creates a strong disturbance in water environmental factors within a river. The change in water pollutant concentrations of sluice-controlled river reaches (SCRRs) is more complex than that of natural river segments. To determine the key factors affecting water pollutant concentration changes in SCRRs, river reaches near the Huaidian Sluice in the Shaying River of China were selected as a case study, and water quality monitoring experiments based on different regulating modes were implemented in 2009 and 2010. To identify the key factors affecting the change rates for the chemical oxygen demand of permanganate (CODMn) and ammonia nitrogen (NH3-N) concentrations in the SCRRs of the Huaidian Sluice, partial correlation analysis, principal component analysis and principal factor analysis were used. The results indicate four factors, i.e., the inflow quantity from upper reaches, opening size of sluice gates, water pollutant concentration from upper reaches, and turbidity before the sluice, which are the common key factors for the CODMn and NH3-N concentration change rates. Moreover, the dissolved oxygen before a sluice is a key factor for the permanganate concentration from CODMn change rate, and the water depth before a sluice is a key factor for the NH3-N concentration change rate. Multiple linear regressions between the water pollutant concentration change rate and key factors were established via multiple linear regression analyses, and the quantitative relationship between the CODMn and NH3-N concentration change rates and key affecting factors was analyzed. Finally, the mechanism of action for the key factors affecting the water pollutant concentration changes was analyzed. The results reveal that the inflow quantity from upper reaches, opening size of sluice gates, permanganate concentration from CODMn from upper reaches and dissolved oxygen before the sluice have a negative influence and the turbidity before the sluice has a positive

  4. PERBANDINGAN EFEKTIFITAS HASIL PENGGELONTORAN SEDIMEN DI WADUK CARA FLUSHING DAN SLUICING

    Directory of Open Access Journals (Sweden)

    Pranoto S. Atmodjo

    2013-10-01

    Full Text Available This study compares the effectiveness of the flushing of sediment in the reservoir by means of flushing andSluicing way, based on Physical Hydraulic Test (Model Test in the laboratory. Flushing is removingaccumulated deposited sediment. While slucing is releasing of sediment through the reservoir beforesettled or keep sediment remain in suspension and its occur during flood period. Sediments FlushEffectiveness represented by the percentage of released sediment by sediment deposited or the amount ofsediment entering the reservoir during the flushing period.The model based on the prototipe from DetailDesign of Structural Countermeasures for Sedimentation on Wonogiri Reservoir by Nippon Koei 2009.Running model duration is one hour, used free flow and submergence condition, with discharge variationQ=100, 200 and 400 m3/s. Sluicing experiments conducted with some 60 liters of sediment sprinkle evenlywide flow, and Flushing implemented by 2,00 m thickness of deposited sediment that spreaded over thereservoir bottom before running. From this research showed that Sluicing way more efficient than theflushing way, where the number of efficiency of sediment Sluicing way bigger than the efficiency offlusing way, in the running an hour in the laboratory test

  5. Experimental investigation on the relationship between sluice caisson shape of tidal power plant and the water discharge capability

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dal Soo; Oh, Sang-Ho; Yi, Jin-Hak; Park, Woo-Sun [Coastal Engineering and Ocean Energy Research Department, Korea Ocean Research and Development Institute, Ansan 426-744 (Korea); Cho, Hyu-Sang; Kim, Duk-Gu; Ahn, Suk-Jin [Technology Research and Development Institute, Hyein E and C Co. Ltd., Seoul 157-861 (Korea); Eom, Hyun-Min [Global Environment System Research Laboratory, National Institute of Meteorological Research/KMA, Seoul 156-720 (Korea)

    2010-10-15

    The change of water discharge capability of the sluice caisson of tidal power plant according to the change of geometrical shape of the sluice caisson was investigated by performing laboratory experiments. The major design parameters that constitute general shape of the sluice caisson were deduced and a total of 32 different shapes of sluice caisson models were subjected to the hydraulic experiments. For every sluice caisson model, the water discharge capability was estimated with five different flow rates and three different water level conditions. The experiments were carried out in an open channel flume with a great care to measure flow rate and water level accurately, which are key physical quantities in estimating the water discharge capability of the sluice caisson models. By analyzing the experimental results, influence of the respective design parameters on the performance of the sluice caisson was examined and the general guidelines to enhance the water discharge capability were suggested. The discharge coefficient of the best sluice caisson model ranged from 2.3 to 3.1 depending on the experimental conditions, which is far higher than the values that were adopted in the past feasibility studies in Korea. (author)

  6. Study on ecological regulation of coastal plain sluice

    Science.gov (United States)

    Yu, Wengong; Geng, Bing; Yu, Huanfei; Yu, Hongbo

    2018-02-01

    Coastal plains are densely populated and economically developed, therefore their importance is self-evident. However, there are some problems related with water in coastal plains, such as low flood control capacity and severe water pollution. Due to complicated river network hydrodynamic force, changeable flow direction and uncertain flood concentration and propagation mechanism, it is rather difficult to use sluice scheduling to realize flood control and tackle water pollution. On the base of the measured hydrological data during once-in-a-century Fitow typhoon in 2013 in Yuyao city, by typical analysis, theoretical analysis and process simulation, some key technologies were researched systematically including plain river network sluice ecological scheduling, “one tide” flood control and drainage scheduling and ecological running water scheduling. In the end, single factor health diagnostic evaluation, unit hydrograph of plain water level and evening tide scheduling were put forward.

  7. Tank 241-C-106 waste retrieval sluicing system process control plan

    Energy Technology Data Exchange (ETDEWEB)

    Carothers, K.G.

    1998-07-25

    Project W-320 has installed the Waste Retrieval Sluicing System at the 200 East Area on the Hanford Site to retrieve the sludge from single-shell tank 241-C-106 and transfer it into double-shell tank 241-AY-102. Operation of the WRSS process will resolve the high-heat safety issue for tank 241-C-106 and demonstrate a technology for the retrieval of single-shell tank wastes. This process control plan coordinates the technical operating requirements (primarily mass transfer, temperature, and flammable gas) for the sluicing operation and provides overall technical guidance for the retrieval activity.

  8. Tank 241-C-106 waste retrieval sluicing system process control plan

    International Nuclear Information System (INIS)

    Carothers, K.G.

    1998-01-01

    Project W-320 has installed the Waste Retrieval Sluicing System at the 200 East Area on the Hanford Site to retrieve the sludge from single-shell tank 241-C-106 and transfer it into double-shell tank 241-AY-102. Operation of the WRSS process will resolve the high-heat safety issue for tank 241-C-106 and demonstrate a technology for the retrieval of single-shell tank wastes. This process control plan coordinates the technical operating requirements (primarily mass transfer, temperature, and flammable gas) for the sluicing operation and provides overall technical guidance for the retrieval activity

  9. W-320 waste retrieval sluicing system transfer line flushing volume and frequency calculation

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1997-01-01

    The calculations contained in this analysis document establish the technical basis for the volume, frequency, and flushing fluid to be utilized for routine Waste Retrieval Sluicing System (WRSS) process line flushes. The WRSS was installed by Project W-320, Tank 241-C-106 Sluicing. The double contained pipelines being flushed have 4 inch stainless steel primary pipes. The flushes are intended to prevent hydrogen buildup in the transfer lines and to provide ALARA conditions for maintenance personnel

  10. Waste Retrieval Sluicing System Campaign Number 3 Solids Volume Transferred Calculation

    International Nuclear Information System (INIS)

    CAROTHERS, K.G.

    1999-01-01

    Waste Retrieval Sluicing System (WRSS) operations at tank 241-C-106 began on Wednesday, November 18, 1998. The purpose of this system is to retrieve and transfer the high-heat sludge from the tank for storage in double-shell tank 241-AY-102, thereby resolving the high-heat safety issue for the tank, and to demonstrate modernized past-practice retrieval technology for single-shell tank waste. Performance Agreement (PA) TWR 1.2.2, C-106 Sluicing, was established by the Department of Energy, Office of River Protection (ORP) for achieving completion of sluicing retrieval of waste from tank 241-C-106 by September 30, 1999. This level of sludge removal is defined in the PA as either removal of approximately 72 inches of sludge or removal of 172,000 gallons of sludge (approximately 62 inches) and less than 6,000 gallons (approximately 2 inches) of sludge removal per 12 hour sluice batch for three consecutive batches. Preliminary calculations of the volume of tank 241-C-106 sludge removed as of September 29, 1999 were provided to ORP documenting completion of PA TWR 1.2.2 (Allen 1999a). The purpose of this calculation is to document the final sludge volume removed from tank 241-C-106 up through September 30, 1999. Additionally, the results of an extra batch completed October 6, 1999 is included to show the total volume of sludge removed through the end of WRSS operations. The calculation of the sludge volume transferred from the tank is guided by engineering procedure HNF-SD-WM-PROC-021, Section 15.0,Rev. 3, sub-section 4.4, ''Calculation of Sludge Transferred.''

  11. Waste Retrieval Sluicing System Campaign Number 3 Solids Volume Transferred Calculation

    International Nuclear Information System (INIS)

    CAROTHERS, K.G.

    1999-01-01

    Waste Retrieval Sluicing System (WRSS) operations at tank 241-C-106 began on Wednesday, November 18,1998. The purpose of this system is to retrieve and transfer the high-heat sludge from the tank for storage in double-shell tank 241-AY-102, thereby resolving the high-heat safety issue for the tank, and to demonstrate modernized past-practice retrieval technology for single-shell tank waste. Performance Agreement (PA) TWR 1.2.2, C-106 Sluicing, was established by the Department of Energy, Office of River Protection (ORP) for achieving completion of sluicing retrieval of waste from tank 241-C-106 by September 30,1999. This level of sludge removal is defined in the PA as either removal of approximately 72 inches of sludge or removal of 172,000 gallons of sludge (approximately 62 inches) and less than 6,000 gallons (approximately 2 inches) of sludge removal per 12 hour sluice batch for three consecutive batches. Preliminary calculations of the volume of tank 241-C-106 sludge removed as of September 29, 1999 were provided to ORP documenting completion of PA TWR 1.2.2 (Allen 1999a). The purpose of this calculation is to document the final sludge volume removed from tank 241-C-106 up through September 30, 1999. Additionally, the results of an extra batch completed October 6, 1999 is included to show the total volume of sludge removed through the end of WRSS operations. The calculation of the sludge volume transferred from the tank is guided by engineering procedure HNF-SD-WM-PROC-021, Section 15.0,Rev. 3, sub-section 4.4, ''Calculation of Sludge Transferred.''

  12. The Real-Time Processing of Sluiced Sentences

    Science.gov (United States)

    Poirier, Josee; Wolfinger, Katie; Spellman, Lisa; Shapiro, Lewis P.

    2010-01-01

    Ellipsis refers to an element that is absent from the input but whose meaning can nonetheless be recovered from context. In this cross-modal priming study, we examined the online processing of Sluicing, an ellipsis whose antecedent is an entire clause: "The handyman threw a book to the programmer but I don't know which book" the handyman threw to…

  13. Hydraulic performance of sluice gate with unloaded upstream rotor ...

    African Journals Online (AJOL)

    ... compared to the flow under rotor and weir flow conditions. The video analysis also indicated that significant perturbation exists for the rotor angular speed. The normalized perturbation intensity varied from a minimum of 8% to a maximum of 60%. Keywords: sluice gate, rotor, angular speed, video analysis, hydropower ...

  14. Waste retrieval sluicing system vapor sampling and analysis plan for evaluation of organic emissions, process test phase III

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    1999-01-01

    This sampling and analysis plan identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained to address vapor issues related to the sluicing of tank 241-C-106. Sampling will be performed in accordance with Waste Retrieval Sluicing System Emissions Collection Phase III (Jones 1999) and Process Test Plan Phase III, Waste Retrieval Sluicing System Emissions Collection (Powers 1999). Analytical requirements include those specified in Request for Ecology Concurrence on Draft Strategy/Path Forward to Address Concerns Regarding Organic Emissions from C-106 Sluicing Activities (Peterson 1998). The Waste Retrieval Sluicing System was installed to retrieve and transfer high-heat sludge from tank 241-C-106 to tank 241-AY-102, which is designed for high-heat waste storage. During initial sluicing of tank 241-C-106 in November 1998, operations were halted due to detection of unexpected high volatile organic compounds in emissions that exceeded regulatory permit limits. Several workers also reported smelling sharp odors and throat irritation. Vapor grab samples from the 296-C-006 ventilation system were taken as soon as possible after detection; the analyses indicated that volatile and semi-volatile organic compounds were present. In December 1998, a process test (phase I) was conducted in which the pumps in tanks 241-C-106 and 241-AY-102 were operated and vapor samples obtained to determine constituents that may be present during active sluicing of tank 241-C-106. The process test was suspended when a jumper leak was detected. On March 7, 1999, phase I1 of the process test was performed; the sluicing system was operated for approximately 7 hours and was ended using the controlled shutdown method when the allowable amount of solids were transferred to 241-AY-102. The phase II test was successful, however, further testing is required to obtain vapor samples at higher emission levels

  15. Project management plan for Project W-320, Tank 241-C-106 sluicing. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, D.R.

    1994-07-01

    A major mission of the US Department of Energy (DOE) is the permanent disposal of Hanford Site defense wastes by utilizing safe, environmentally acceptable, and cost-effective disposal methods that meet applicable regulations. The Tank Waste Remediation System (TWRS) Program was established at the Hanford Site to manage and control activities specific to the remediation of safety watch list tanks, including high-heat-producing tanks, and for the ultimate characterization, retrieval, pretreatment, and disposal of the low- and high-level fractions of the tank waste. Project W-320, Tank 241-C-106 Sluicing, provides the methodology, equipment, utilities, and facilities necessary for retrieving the high-heat waste from single-shell tank (SST) 24-C-106. Project W-320 is a fiscal year (FY) 1993 expense-funded major project, and has a design life of 2 years. Retrieval of the waste in tank 241-C-106 will be accomplished through mobilization of the sludge into a pumpable slurry using past-practice sluicing. The waste is then transferred directly to a double-shell tank for interim storage, subsequent pretreatment, and eventual disposal. A detailed description of the management organization and responsibilities of all participants is presented in this document.

  16. Project management plan for Project W-320, Tank 241-C-106 sluicing. Revision 2

    International Nuclear Information System (INIS)

    Phillips, D.R.

    1994-07-01

    A major mission of the US Department of Energy (DOE) is the permanent disposal of Hanford Site defense wastes by utilizing safe, environmentally acceptable, and cost-effective disposal methods that meet applicable regulations. The Tank Waste Remediation System (TWRS) Program was established at the Hanford Site to manage and control activities specific to the remediation of safety watch list tanks, including high-heat-producing tanks, and for the ultimate characterization, retrieval, pretreatment, and disposal of the low- and high-level fractions of the tank waste. Project W-320, Tank 241-C-106 Sluicing, provides the methodology, equipment, utilities, and facilities necessary for retrieving the high-heat waste from single-shell tank (SST) 24-C-106. Project W-320 is a fiscal year (FY) 1993 expense-funded major project, and has a design life of 2 years. Retrieval of the waste in tank 241-C-106 will be accomplished through mobilization of the sludge into a pumpable slurry using past-practice sluicing. The waste is then transferred directly to a double-shell tank for interim storage, subsequent pretreatment, and eventual disposal. A detailed description of the management organization and responsibilities of all participants is presented in this document

  17. Calibration of submerged multi-sluice gates

    Directory of Open Access Journals (Sweden)

    Mohamed F. Sauida

    2014-09-01

    The main objective of this work is to study experimentally and verify empirically the different parameters affecting the discharge through submerged multiple sluice gates (i.e., the expansion ratios, gates operational management, etc.. Using multiple regression analysis of the experimental results, a general equation for discharge coefficient is developed. The results show, that the increase in the expansion ratio and the asymmetric operation of gates, give higher values for the discharge coefficient. The obtained predictions of the discharge coefficient using the developed equations are compared to the experimental data. The present developed equations showed good consistency and high accuracy.

  18. Chemical and chemically-related considerations associated with sluicing tank C-106 waste to tank AY-102

    International Nuclear Information System (INIS)

    Reynolds, D.A.

    1997-01-01

    New data on tank 241-C-106 were obtained from grab sampling and from compatibility testing of tank C-106 and tank AY-102 wastes. All chemistry-associated and other compatibility Information compiled in this report strongly suggests that the sluicing of the contents of tank C-106, in accord with appropriate controls, will pose no unacceptable risk to workers, public safety, or the environment. In addition, it is expected that the sluicing operation will successfully resolve the High-Heat Safety Issue for tank C-106

  19. Contingency plan for the Old Hydrofracture Facility Tanks Sluicing Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-06-01

    This revised contingency plan addresses potential scenarios involving the release of radioactively contaminated waste from the Old Hydrofracture Facility Tanks Contents Removal project to the environment. The tanks are located at the Oak Ridge National Laboratory. The project involves sluicing the contents of the five underground tanks to mix the sludge and supernatant layers, and pumping the mixture to the Melton Valley Storage Tanks (MVST) for future processing. The sluicing system to be used for the project consists of a spray nozzle designated the open-quotes Borehole Miner,close quotes with an associated pump; in-tank submersible pumps to transfer tank contents from the sluice tanks to the recycle tank; high-pressure pumps providing slurry circulation and slurry transport to the MVST; piping; a ventilation system; a process water system; an instrumentation and control system centered around a programmable logic controller; a video monitoring system; and auxiliary equipment. The earlier version of this plan, which was developed during the preliminary design phase of the project, identified eight scenarios in which waste from the tanks might be released to the environment as a result of unanticipated equipment failure or an accident (e.g., vehicular accident). One of those scenarios, nuclear criticality, is no longer addressed by this plan because the tank waste will be isotopically diluted before sluicing begins. The other seven scenarios have been combined into three, and a fourth, Borehole Miner Failure, has been added as follows: (1) underground release from the tanks; (2) aboveground release or spill from the sluicing system, a tank riser, or the transfer pipeline; (3) release of unfiltered air through the ventilation system; and (4) Borehole Miner arm retraction failure. Methods for preventing, detecting, and responding to each release scenario are set out in the plan

  20. Permitting plan for project W-320 tank 241-C-106 waste retrieval sluicing system (WRSS)

    International Nuclear Information System (INIS)

    Symons, G.A.

    1997-01-01

    This document describes the permitting plan for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). A comprehensive review of environmental regulations have indicated that several environmental reviews [e.g. National Environmental Policy Act (NEPA), State Environmental Policy Act (SEPA)], permits, and approvals are required prior to construction or operation of the facility. The environmental reviews, permits and approvals, as well the regulatory authority, potentially applicable to the Tank 241-C-106 WRSS include the following: for NEPA - U.S. Department of Energy-Headquarters: Action Description Memorandum, Environmental Assessment, Categorical Exclusion, and Environmental Impact Statement; and for SEPA - State of Washington Department of Ecology (Ecology) Determination of Nonsignificance, Mitigated Determination of Nonsignificance, Determination of Significance, and SEPA Environmental Checklist

  1. Actor coalitions and implementation in strategic delta planning: Opening the Haringvliet sluices in the Netherlands

    Science.gov (United States)

    Vermoolen, Myrthe; Hermans, Leon

    2016-04-01

    The sustained development of urbanizing deltas is influenced by natural and societal processes. These processes are characterized by their long time span, in which conflicting interests of different stakeholders have to be reconciled. Reaching consent between actors is a challenge itself, but maintaining this consent throughout different stages of strategic planning - from advocacy and agenda setting to implementation - over these long periods of time is even more difficult. The implementation stage still includes many different actors involved, some of which are different than the ones who agreed before, due to both the long run of the strategic delta planning, and to a shift of tasks and responsibilities. Thus, implementation of strategic plans often features delays, deviations of agreed plans and unintended outcomes. A key question therefore is how coalition dynamics in (pre-)planning stages influence and are influenced by the coalition dynamics during implementation. The different stages in strategic planning are often studied from either a plan formulation or an implementation perspective, but the connection between the two proves an important bottleneck for strategic planning in deltas. For instance, many building with nature solutions are still in their pilot-phase, and their upscaling can profit from lessons concerning past implementation efforts. The proposed contribution will use the case of the management of the Dutch Haringvliet sluices and the decision ('Kierbesluit') in 2000 to put these sluices ajar, to study the link between the different strategic delta planning stages and the role of the formation and change of actor coalitions herein. With the completion of the Haringvliet dam with outlet sluices in 1970, the Haringvliet estuary of the rivers Rhine and Meuse was closed off from the sea, creating a fresh water lake. This was done to make the Dutch Southwest delta safe from flooding, and had positive effects for agricultural water supply and

  2. Effect of Riffle Height and Spacing of a Sluice Board on Placer Gold ...

    African Journals Online (AJOL)

    Michael

    2017-06-01

    Jun 1, 2017 ... turbulence formed in the flow because the angular speeds of the whirl flow .... (6). Where the liquid gets in contact with the surface of the sluice board, the height of fluid, h = 0, and v = 0. ..... American Society for Quality (ASQ).

  3. Complex composition film condensation in the sluice device of an electron microscope

    International Nuclear Information System (INIS)

    Kukuev, V.I.; Lesovoj, M.V.; Vlasov, D.A.; Malygin, M.V.; Domashevskaya, Eh.P.; Tomashpol'skij, Yu.Ya.

    1994-01-01

    Based on the sluice device of an electron microscope a system is developed for material laser evaporation and vapor condensation on a substrate, situated in the microscope specimen holder. Substrate heating by laser radiation to 100 deg C is used. The system is applied for investigating growth of high-temperature superconductor films

  4. Innovative technology summary report: Confined sluicing end effector

    International Nuclear Information System (INIS)

    1998-09-01

    A Confined Sluicing End-Effector (CSEE) was field tested during the summer of 1997 in Tank W-3, one of the Gunite and Associated Tanks (GAAT) at the Oak Ridge Reservation (ORR). It should be noted that the specific device used at the Oak Ridge Reservation demonstration was the Sludge Retrieval End-Effector (SREE), although in common usage it is referred to as the CSEE. Deployed by the Modified Light-Duty Utility Arm (MLDUA) and the Houdini remotely operated vehicle (ROV), the CSEE was used to mobilize and retrieve waste from the tank. After removing the waste, the CSEE was used to scarify the gunite walls of Tank W-3, removing approximately 0.1 in of material. The CSEE uses three rotating water-jets to direct a short-range pressurized jet of water to effectively mobilize the waste. Simultaneously, the water and dislodged tank waste, or scarified materials, are aspirated using a water-jet pump-driven conveyance system. The material is then pumped outside of the tank, where it can be stored for treatment. The technology, its performance, uses, cost, and regulatory issues are discussed

  5. Tank 241-C-106 past-practice sluicing waste retrieval, Hanford Site, Richland, Washington. Environmental Assessment

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy (DOE) needs to take action to eliminate safety concerns with storage of the high-heat waste in Tank 241-C-106 (Tank C-106), and demonstrate a tank waste retrieval technology. This Environmental Assessment (EA) was prepared to analyze the potential impacts associated with the proposed action, past-practice sluicing of Tank C-106, an underground single-shell tank (SST). Past-practice sluicing is defined as the mode of waste retrieval used extensively in the past at the Hanford Site on the large underground waste tanks, and involves introducing a high-volume, low-pressure stream of liquid to mobilize sludge waste prior to pumping. It is proposed to retrieve the waste from Tank C-106 because this waste is classified not only as transuranic and high-level, but also as high-heat, which is caused by the radioactive decay of strontium. This waste characteristic has led DOE to place Tank C-106 on the safety ''Watchlist.''

  6. Project W-320, waste retrieval sluicing system: BIO/SER implementation matrices

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the safety related commitments specified in HNF-SD-WM-810-001, Addendum 1 for the Waste Retrieval Sluicing System, Project W-320 and Project W-320 Safety Evaluation Report (SER), have been implemented in the project hardware, procedures and administrative controls. Four appendices include matrices which show where the 810 commitments are implemented for limiting conditions of operation and surveillance requirements controls, administrative controls, defense-in-depth controls and controls discussed in 810 Addendum 1. A fifth appendix includes the implementation of Project W-320 SER issues and provisions

  7. Structure modulates similarity-based interference in sluicing: An eye tracking study.

    Directory of Open Access Journals (Sweden)

    Jesse A. Harris

    2015-12-01

    Full Text Available In cue-based content-addressable approaches to memory, a target and its competitors are retrieved in parallel from memory via a fast, associative cue-matching procedure under a severely limited focus of attention. Such a parallel matching procedure could in principle ignore the serial order or hierarchical structure characteristic of linguistic relations. I present an eye tracking while reading experiment that investigates whether the sentential position of a potential antecedent modulates the strength of similarity-based interference, a well-studied effect in which increased similarity in features between a target and its competitors results in slower and less accurate retrieval overall. The manipulation trades on an independently established Locality bias in sluiced structures to associate a wh-remnant (which ones in clausal ellipsis with the most local correlate (some wines, as in The tourists enjoyed some wines, but I don’t know which ones. The findings generally support cue-based parsing models of sentence processing that are subject to similarity-based interference in retrieval, and provide additional support to the growing body of evidence that retrieval is sensitive to both the structural position of a target antecedent and its competitors, and the specificity of retrieval cues.

  8. Integrated Methodologies for the 3D Survey and the Structural Monitoring of Industrial Archaeology: The Case of the Casalecchio di Reno Sluice, Italy

    Directory of Open Access Journals (Sweden)

    Gabriele Bitelli

    2011-01-01

    Full Text Available The paper presents an example of integrated surveying and monitoring activities for the control of an ancient structure, the Casalecchio di Reno sluice, located near Bologna, Italy. Several geomatic techniques were applied (classical topography, high-precision spirit levelling, terrestrial laser scanning, digital close-range photogrammetry, and thermal imagery. All these measurements were put together in a unique reference system and used in order to study the stability and the movements of the structure over the period of time observed. Moreover, the metrical investigations allowed the creation of a 3D model of the structure, and the comparison between two situations, before and after the serious damages suffered by the sluice during the winter season 2008-2009. Along with the detailed investigations performed on individual portions of the structure, an analysis of the whole sluice, carried out at a regional scale, was done via the use of aerial photogrammetry, using both recently acquired images and historical photogrammetric coverage. The measurements were carried out as part of a major consolidation and restoration activity, carried out by the “Consorzio della Chiusa di Casalecchio e del Canale di Reno”.

  9. An inversion of the estuarine circulation by sluice water discharge and its impact on suspended sediment transport

    Science.gov (United States)

    Schulz, Kirstin; Gerkema, Theo

    2018-01-01

    The Wadden Sea is characterized by a complex topography of branching channels and intertidal flats, in which the interplay between fresh water discharges, wind forcing and the tidal current causes sediment transport rates and direction to be highly variable in space and time. During three field campaigns, indications of a negative estuarine circulation have been found in a channel adjacent to the coast in the Western Dutch Wadden Sea. Contrary to the classical picture of estuarine circulation, a periodic density stratification was observed that builds up during flood and breaks down during ebb. This can be related to a large freshwater source at the mouth of the channel, the sluice in Kornwerderzand. In this study, observations of this phenomenon are presented, and with the help of a numerical model the different drivers for residual suspended matter transport in this area, namely tidal asymmetries in the current velocity and the above mentioned periodic stratification, are investigated. It is found that the residual current in the area of interest points in ebb direction, caused by both the elongated ebb flow phase and the periodic stratification. On the contrary, the stronger flood currents cause a transport of suspended matter in flood direction. This transport is counteracted and therefore diminished by the effects of the sluice discharge.

  10. Waste retrieval sluicing system data acquisition system acceptance test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115

  11. Bird casualties and wind turbines near the Kreekrak sluices of Zeeland

    International Nuclear Information System (INIS)

    Musters, C.J.M.; Noordervliet, M.A.W.; Ter Keurs, W.J.

    1995-03-01

    The impact of wind turbines on birds was investigated for an estuary, situated near the North Sea coast in the Dutch province of Zeeland, with large amount of bird migration. Five 250 kW, three-bladed 25m, 40 rpm turbines were installed on the western side of a dike. The distance between the turbines is 125 m. Since 1 April 1990 the turbines have been in action almost continuously. The study on the title subject was set up to investigate the number of bird casualties caused by the five wind turbines near the sluices of Kreekrak and the number that may be expected to be caused by a total of 20 turbines. The study also focused on the number of casualties among rare birds in relation to those among the common birds as a result of the wind turbines in the Kreekrak area. An area of 125 x 125 m around each wind turbine, consisting partly of land and partly of water, was searched for dead birds every other day during a period of one year (28 April 1990 - 29 April 1991). During this one-year period, the bodies of 26 birds of 17 different species were found; six birds were certainly or almost certainly killed by the turbines. In three other cases, the birds may have died because of the turbines, while in the case of eight birds, it was not possible to determine the cause of death. The remaining nine birds were not killed by the wind turbines. The annual number of bird victims expected following the installation of 20 wind turbines was estimated at a minimum of 7 and a maximum of 142. For each species a correlation was found between the number of victims and the estimated number of visitors to the area. This suggests that the rare species among the birds were not excessively endangered by the turbines. The number of bird casualties per turbine was low in comparison with the results of other Dutch investigations. On the basis of these results, it is concluded that there is no reason to advise against increasing the number of wind turbines near the sluices of Kreekrak to 20. 3

  12. SPECIFICITY IN DEVELOPMENT OF CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    O. S. Golubova

    2012-01-01

    Full Text Available Specificity in development of construction industry of the Republic of Belarus determines  character of competition on the construction market, forms a pricing, marketing and product policy of building companies. Construction represents itself as a highly developed complex where interaction of business entities is of rather complicated multilateral character.

  13. Construction and material specification

    Science.gov (United States)

    2002-01-01

    These Construction and Material Specifications are written to the Bidder before award of the : Contract and to the Contractor after award of the Contract. The sentences that direct the Contractor to perform Work are written as commands. For example, ...

  14. Automatic Construction of Java Programs from Functional Program Specifications

    OpenAIRE

    Md. Humayun Kabir

    2015-01-01

    This paper presents a novel approach to construct Java programs automatically from the input functional program specifications on natural numbers from the constructive proofs of the input specifications using an inductive theorem prover called Poiti'n. The construction of a Java program from the input functional program specification involves two phases. The theorem prover is used to construct a higher order functional (HOF) program from the input specification expressed as an existential the...

  15. Factors affecting the implementation of green specifications in construction.

    Science.gov (United States)

    Lam, Patrick T I; Chan, Edwin H W; Poon, C S; Chau, C K; Chun, K P

    2010-01-01

    Green specifications constitute one of the important elements in green construction. New sustainability requirements and changing priorities in construction management have spurred the emerging green specifications to a faster pace of development. A cross-sectional survey has been conducted in Hong Kong in 2007 to identify principal factors leading to the success of preparing green specifications. Based on extensive construction management literature, 20 variables concerning sustainable construction were summarized. Using the Mann-Whitney U-test, the subtle differences between stakeholders in specifying construction work have been detected even with the high consistency of the responses among the groups. Moreover, five independent factors for successful specification of green construction have been categorized by factor analysis. They are related to (1) green technology and techniques, (2) reliability and quality of specification, (3) leadership and responsibility, (4) stakeholder involvement, and (5) guide and benchmarking systems. Whilst the first and fourth factors are generally more important, different stakeholder groups have different emphases. The results of the survey have been validated against established principles. 2009 Elsevier Ltd. All rights reserved.

  16. Tank vapor sampling and analysis data package for tank 241-C-106 waste retrieval sluicing system process test phase III

    Energy Technology Data Exchange (ETDEWEB)

    LOCKREM, L.L.

    1999-08-13

    This data package presents sampling data and analytical results from the March 28, 1999, vapor sampling of Hanford Site single-shell tank 241-C-106 during active sluicing. Samples were obtained from the 296-C-006 ventilation system stack and ambient air at several locations. Characterization Project Operations (CPO) was responsible for the collection of all SUMMATM canister samples. The Special Analytical Support (SAS) vapor team was responsible for the collection of all triple sorbent trap (TST), sorbent tube train (STT), polyurethane foam (PUF), and particulate filter samples collected at the 296-C-006 stack. The SAS vapor team used the non-electrical vapor sampling (NEVS) system to collect samples of the air, gases, and vapors from the 296-C-006 stack. The SAS vapor team collected and analyzed these samples for Lockheed Martin Hanford Corporation (LMHC) and Tank Waste Remediation System (TWRS) in accordance with the sampling and analytical requirements specified in the Waste Retrieval Sluicing System Vapor Sampling and Analysis Plan (SAP) for Evaluation of Organic Emissions, Process Test Phase III, HNF-4212, Rev. 0-A, (LMHC, 1999). All samples were stored in a secured Radioactive Materials Area (RMA) until the samples were radiologically released and received by SAS for analysis. The Waste Sampling and Characterization Facility (WSCF) performed the radiological analyses. The samples were received on April 5, 1999.

  17. Controlling The Surface Water of Shatt Al Arab River by using Sluice Gates

    Directory of Open Access Journals (Sweden)

    Ahmed Naseh Ahmed Hamdan

    2016-03-01

    Full Text Available The purpose of this study is to find hydrodynamic simulations of river water by controlging gates in Shatt Al Arab river. This river is formed by the meeting of the Tigris and Euphrates rivers near the city of Qurna in the south of Iraq, and it pours into the Arabian Gulf. Hydrodynamic simulations give a proper understanding performance and optimize utilization of the gates controlging the water level. Three different sluice gates opening cases simulate the water surface level using HEC-RAS in Shatt Al Arab river. These cases where being studied within two situations of Tide (the highest high water level and the lowest low water level within the downstream of Shatt Al Arab river. The study also deals with six cases of flow rates in upstream of Shatt Al Arab river. Hec-Ras model is produced by US Army for analyzing river system. This model could simulate steady and unsteady open channel flow.

  18. Stagnation, circulation, and erosion of granular materials through belt conveyor sluice gate

    Science.gov (United States)

    Pohlman, Nicholas; Moralda, Michael; Dunne, Ryan

    2013-11-01

    Control of flow rates in conversion reactors for discrete materials like biomass can be achieved in belt conveyors through a combination of belt speed, hopper size, and aperture opening. As material is extracted from the bottom of the storage hopper, other material cannot achieve plug flow and therefore is restricted from exiting through a sluice-gate type opening. The excess material moves vertically from the opening causing a pile up and recirculation back along the free surface of the hopper. Experimental results obtained through high speed imaging show the position of the stagnation point as well as the rate of circulation is dependent on the mass flow rate achieved and instantaneous fill level. The movement of material into the plug flow along the belt allows verification of deposition models on erodible beds rather than rigid surfaces with artificial roughness of glued particles. Similarly, the pile-up at the exit influences the efficiency of the transport affecting the narrow energy return on investment of biomass resources. The laboratory-scale behavior can therefore be translated into industrial performance metrics for increased operational efficiency. This work is supported by the NSF REU Site Operation E-Tank under award number 1156789.

  19. Impact of sediments resuspension on metal solubilization and water quality during recurrent reservoir sluicing management

    Energy Technology Data Exchange (ETDEWEB)

    Frémion, Franck; Courtin-Nomade, Alexandra [Groupement de Recherche Eau Sol Environnement, Université de Limoges, 123 avenue Albert Thomas, 87060 Limoges Cedex (France); Bordas, François, E-mail: francois.bordas@unilim.fr [Groupement de Recherche Eau Sol Environnement, Université de Limoges, 123 avenue Albert Thomas, 87060 Limoges Cedex (France); Lenain, Jean-François [Groupement de Recherche Eau Sol Environnement, Université de Limoges, 123 avenue Albert Thomas, 87060 Limoges Cedex (France); Jugé, Philippe [CETU – ELMIS Ingénieries, Université François Rabelais, , 60 Rue du Plat d' Étain, 37000 Tours (France); Kestens, Tim [EDF – DPIH, Unité de Production Centre, 19 bis avenue de la Révolution, BP 406, 87012 Limoges Cedex (France); Mourier, Brice [Groupement de Recherche Eau Sol Environnement, Université de Limoges, 123 avenue Albert Thomas, 87060 Limoges Cedex (France)

    2016-08-15

    In dam contexts, sluicing operations can be performed to reestablish sediments continuity, as proposed by the EU Water Framework Directive, as well as to preserve the reservoirs' water storage capacity. Such management permits the rapid release of high quantities of reservoir sediments through the opening of dam bottom valves. This work aims to study the impact of such operation on the evolution of environmental physicochemical conditions notably changes in dissolved metallic elements concentrations (Al, As, Cd, Cr, Cu, Fe, Mn, Ni, Pb, Zn) through field and laboratory investigations. Results were interpreted in terms of concentrations and fluxes, and compared with data collected on an annual basis regarding both suspended matter and metallic elements. The release of high quantities of sediments (4,500 tons dry weight in 24 h), with concentrations representing up to 300 times the inter-annual mean suspended sediments discharge, significantly modified water parameters, notably solid/liquid (S/L) ratio, pH and redox conditions. Despite the fact that they are mainly trapped in stable phases, a clear increase of the solubilized metals content was measured, representing up to 60 times the maximum values of current exploitation. This solubilization is related to desorption phenomena from sediments through changes in chemical equilibriums as highlighted by laboratory characterizations and experiments. These chemical modifications are mainly attributed to S/L ratio variations. Indeed, the low S/L ratios (≤ 1.3 g·L{sup −1}) measured in situ are typically the ones for which metals solubilization is the highest, as shown by laboratory experiments. Additional thermodynamic modeling highlighted that the decrease in pH measured during the operation favors the release of the free forms of metallic elements (Al and Cu), and decreases the OM complexation influence. These changes, either in term of physical conditions or speciation, increasing metals long term

  20. Tank vapor sampling and analysis data package for tank 241-C-106 waste retrieval sluicing system process test phase III, sampled March 28, 1999

    International Nuclear Information System (INIS)

    LOCKREM, L.L.

    1999-01-01

    This data package presents sampling data and analytical results from the March 28, 1999, vapor sampling of Hanford Site single-shell tank 241-C-106 during active sluicing. Samples were obtained from the 296-C-006 ventilation system stack and ambient air at several locations. Characterization Project Operations (CPO) was responsible for the collection of all SUMMATM canister samples. The Special Analytical Support (SAS) vapor team was responsible for the collection of all triple sorbent trap (TST), sorbent tube train (STT), polyurethane foam (PUF), and particulate filter samples collected at the 296-C-006 stack. The SAS vapor team used the non-electrical vapor sampling (NEVS) system to collect samples of the air, gases, and vapors from the 296-C-006 stack. The SAS vapor team collected and analyzed these samples for Lockheed Martin Hanford Corporation (LMHC) and Tank Waste Remediation System (TWRS) in accordance with the sampling and analytical requirements specified in the Waste Retrieval Sluicing System Vapor Sampling and Analysis Plan (SAP) for Evaluation of Organic Emissions, Process Test Phase III, HNF-4212, Rev. 0-A, (LMHC, 1999). All samples were stored in a secured Radioactive Materials Area (RMA) until the samples were radiologically released and received by SAS for analysis. The Waste Sampling and Characterization Facility (WSCF) performed the radiological analyses. The samples were received on April 5, 1999

  1. Bioprinting Cellularized Constructs Using a Tissue-specific Hydrogel Bioink

    Science.gov (United States)

    Skardal, Aleksander; Devarasetty, Mahesh; Kang, Hyun-Wook; Seol, Young-Joon; Forsythe, Steven D.; Bishop, Colin; Shupe, Thomas; Soker, Shay; Atala, Anthony

    2016-01-01

    Bioprinting has emerged as a versatile biofabrication approach for creating tissue engineered organ constructs. These constructs have potential use as organ replacements for implantation in patients, and also, when created on a smaller size scale as model "organoids" that can be used in in vitro systems for drug and toxicology screening. Despite development of a wide variety of bioprinting devices, application of bioprinting technology can be limited by the availability of materials that both expedite bioprinting procedures and support cell viability and function by providing tissue-specific cues. Here we describe a versatile hyaluronic acid (HA) and gelatin-based hydrogel system comprised of a multi-crosslinker, 2-stage crosslinking protocol, which can provide tissue specific biochemical signals and mimic the mechanical properties of in vivo tissues. Biochemical factors are provided by incorporating tissue-derived extracellular matrix materials, which include potent growth factors. Tissue mechanical properties are controlled combinations of PEG-based crosslinkers with varying molecular weights, geometries (linear or multi-arm), and functional groups to yield extrudable bioinks and final construct shear stiffness values over a wide range (100 Pa to 20 kPa). Using these parameters, hydrogel bioinks were used to bioprint primary liver spheroids in a liver-specific bioink to create in vitro liver constructs with high cell viability and measurable functional albumin and urea output. This methodology provides a general framework that can be adapted for future customization of hydrogels for biofabrication of a wide range of tissue construct types. PMID:27166839

  2. Bioprinting Cellularized Constructs Using a Tissue-specific Hydrogel Bioink.

    Science.gov (United States)

    Skardal, Aleksander; Devarasetty, Mahesh; Kang, Hyun-Wook; Seol, Young-Joon; Forsythe, Steven D; Bishop, Colin; Shupe, Thomas; Soker, Shay; Atala, Anthony

    2016-04-21

    Bioprinting has emerged as a versatile biofabrication approach for creating tissue engineered organ constructs. These constructs have potential use as organ replacements for implantation in patients, and also, when created on a smaller size scale as model "organoids" that can be used in in vitro systems for drug and toxicology screening. Despite development of a wide variety of bioprinting devices, application of bioprinting technology can be limited by the availability of materials that both expedite bioprinting procedures and support cell viability and function by providing tissue-specific cues. Here we describe a versatile hyaluronic acid (HA) and gelatin-based hydrogel system comprised of a multi-crosslinker, 2-stage crosslinking protocol, which can provide tissue specific biochemical signals and mimic the mechanical properties of in vivo tissues. Biochemical factors are provided by incorporating tissue-derived extracellular matrix materials, which include potent growth factors. Tissue mechanical properties are controlled combinations of PEG-based crosslinkers with varying molecular weights, geometries (linear or multi-arm), and functional groups to yield extrudable bioinks and final construct shear stiffness values over a wide range (100 Pa to 20 kPa). Using these parameters, hydrogel bioinks were used to bioprint primary liver spheroids in a liver-specific bioink to create in vitro liver constructs with high cell viability and measurable functional albumin and urea output. This methodology provides a general framework that can be adapted for future customization of hydrogels for biofabrication of a wide range of tissue construct types.

  3. Construction and Verification of PLC LD-programs by LTL-specification

    Directory of Open Access Journals (Sweden)

    E. V. Kuzmin

    2013-01-01

    Full Text Available An approach to construction and verification of PLC LD-programs for discrete problems is proposed. For the specification of the program behavior, we use the linear-time temporal logic LTL. Programming is carried out in the LD-language (Ladder Diagram according to an LTL-specification. The correctness analysis of an LTL-specification is carried out by the symbolic model checking tool Cadence SMV. A new approach to programming and verification of PLC LD-programs is shown by an example. For a discrete problem, we give a LD-program, its LTL-specification and an SMV-model. The purpose of the article is to describe an approach to programming PLC, which would provide a possibility of LD-program correctness analysis by the model checking method. Under the proposed approach, the change of the value of each program variable is described by a pair of LTL-formulas. The first LTL-formula describes situations which increase the value of the corresponding variable, the second LTL-formula specifies conditions leading to a decrease of the variable value. The LTL-formulas (used for speci- fication of the corresponding variable behavior are constructive in the sense that they construct the PLC-program (LD-program, which satisfies temporal properties expressed by these formulas. Thus, the programming of PLC is reduced to the construction of LTLspecification of the behavior of each program variable. In addition, an SMV-model of a PLC LD-program is constructed according to LTL-specification. Then, the SMV-model is analysed by the symbolic model checking tool Cadence SMV.

  4. Biopolitics problems of large-scale hydraulic engineering construction

    International Nuclear Information System (INIS)

    Romanenko, V.D.

    1997-01-01

    The XX century which will enter in a history as a century of large-scale hydraulic engineering constructions come to the finish. Only on the European continent 517 large reservoirs (more than 1000 million km 3 of water were detained, had been constructed for a period from 1901 till 1985. In the Danube basin a plenty for reservoirs of power stations, navigations, navigating sluices and other hydraulic engineering structures are constructed. Among them more than 40 especially large objects are located along the main bed of the river. A number of hydro-complexes such as Dnieper-Danube and Gabcikovo, Danube-Oder-Labe (project), Danube-Tissa, Danube-Adriatic Sea (project), Danube-Aegean Sea, Danube-Black Sea ones, are entered into operation or are in a stage of designing. Hydraulic engineering construction was especially heavily conducted in Ukraine. On its territory some large reservoirs on Dnieper and Yuzhny Bug were constructed, which have heavily changed the hydrological regime of the rivers. Summarised the results of river systems regulating in Ukraine one can be noted that more than 27 thousand ponds (3 km 3 per year), 1098 reservoirs of total volume 55 km 3 , 11 large channels of total length more than 2000 km and with productivity of 1000 m 2 /s have been created in Ukraine. Hydraulic engineering construction played an important role in development of the industry and agriculture, water-supply of the cities and settlements, in environmental effects, and maintenance of safe navigation in Danube, Dnieper and other rivers. In next part of the paper, the environmental changes after construction of the Karakum Channel on the Aral Sea in the Middle Asia are discussed

  5. Specificity and detail in autobiographical memory: Same or different constructs?

    Science.gov (United States)

    Kyung, Yoonhee; Yanes-Lukin, Paula; Roberts, John E

    2016-01-01

    Research on autobiographical memory has focused on whether memories are coded as specific (i.e., describe a single event that happened at a particular time and place). Although some theory and research suggests that the amount of detail in autobiographical memories reflects a similar underlying construct as memory specificity, past research has not investigated whether these variables converge. Therefore, the present study compared the proportion of specific memories and the amount of detail embedded in memory responses to cue words. Results demonstrated that memory detail and proportion of specific memories were not correlated with each other and showed different patterns of association with other conceptually relevant variables. When responses to neutral cue words were examined in multiple linear and logistic regression analyses, the proportion of specific memories uniquely predicted less depressive symptoms, low emotional avoidance, lower emotion reactivity, better executive control and lower rumination, whereas the amount of memory detail uniquely predicted the presence of depression diagnosis, as well as greater depressive symptoms, subjective stress, emotion reactivity and rumination. Findings suggest that the ability to retrieve specific memories and the tendency to retrieve detailed personal memories reflect different constructs that have different implications in the development of emotional distress.

  6. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Site layout, site-specific erection plan and construction... Steel Erection § 1926.752 Site layout, site-specific erection plan and construction sequence. (a... strength or sufficient strength to support the loads imposed during steel erection. (c) Site layout. The...

  7. Imaging through obscurations for sluicing operations in the waste storage tanks

    International Nuclear Information System (INIS)

    Peters, T.J.; McMakin, D.L.; Sheen, D.M.; Chieda, M.A.

    1994-08-01

    Waste remediators have identified that surveillance of waste remediation operations and periodic inspections of stored waste are required under very demanding and difficult viewing environments. In many cases, obscurants such as dust or water vapor are generated as part of the remediation activity. Methods are required for viewing or imaging beyond the normal visual spectrum. Work space images guide the movement of remediation equipment, creating a need for rapidly updated, near real-time imaging capability. In addition, there is a need for three-dimensional topographical data to determine the contours of the wastes, to plan retrieval campaigns, and to provide a three-dimensional map of a robot's work space as basis for collision avoidance. Three basic imaging techniques were evaluated: optical, acoustic and radar. The optical imaging methods that were examined used cameras which operated in the visible region and near-infrared region and infrared cameras which operated in the 3--5 micron and 8--12 micron wavelength regions. Various passive and active lighting schemes were tested, as well as the use of filters to eliminate reflection in the visible region. Image enhancement software was used to extend the range where visual techniques could be used. In addition, the operation of a laser range finder, which operated at 0.835 microns, was tested when fog/water droplets were suspended in the air. The acoustic technique involved using commercial acoustic sensors, operating at approximately 50 kHz and 215 kHz, to determine the attenuation of the acoustic beam in a high-humidity environment. The radar imaging methods involved performing millimeter wave (94 GHz) attenuation measurement sin the various simulated sluicing environments and performing preliminary experimental imaging studies using a W-Band (75--110 GHz) linearly scanned transceiver in a laboratory environment. The results of the tests are discussed

  8. Surveillance of construction worker injuries: the utility of trade-specific analysis.

    Science.gov (United States)

    Hunting, K L; Welch, L S; Nessel-Stephens, L; Anderson, J; Mawudeku, A

    1999-07-01

    Construction is a dangerous industry, with high rates of both fatal and nonfatal injuries. To learn more about the causes of nonfatal construction worker injuries, and to identify injury cases for further work site-based investigations or prevention programs, we established an emergency department-based surveillance program in November 1990. This article describes circumstances of injury, diagnoses, and demographic characteristics of injured construction workers for 2,791 cases identified through mid-August, 1997. Lacerations and strains and sprains were the most frequent diagnoses; cutting and piercing objects were the leading causes of injury among all construction workers, followed by falls and overexertion. Because of the variety of work performed in this industry, more detailed injury descriptions, by trade, are most useful for thinking about injury prevention. To illustrate this, we profile injury patterns among workers from four specific trades: carpenters, electricians, plumbers, and ironworkers. Areas of concern highlighted by the trade-specific analyses include eye injuries among plumbers; falls from ladders among electricians and plumbers; slips, trips, and falls on the same level among ironworkers; electrical exposure among electricians; and, amputations among carpenters.

  9. Specifically Designed Constructed Wetlands: A Novel Treatment Approach for Scrubber Wastewater

    Energy Technology Data Exchange (ETDEWEB)

    John H. Rodgers Jr; James W. Castle; Chris Arrington: Derek Eggert; Meg Iannacone

    2005-09-01

    A pilot-scale wetland treatment system was specifically designed and constructed at Clemson University to evaluate removal of mercury, selenium, and other constituents from flue gas desulfurization (FGD) wastewater. Specific objectives of this research were: (1) to measure performance of a pilot-scale constructed wetland treatment system in terms of decreases in targeted constituents (Hg, Se and As) in the FGD wastewater from inflow to outflow; (2) to determine how the observed performance is achieved (both reactions and rates); and (3) to measure performance in terms of decreased bioavailability of these elements (i.e. toxicity of sediments in constructed wetlands and toxicity of outflow waters from the treatment system). Performance of the pilot-scale constructed wetland treatment systems was assessed using two criteria: anticipated NPDES permit levels and toxicity evaluations using two sentinel toxicity-testing organisms (Ceriodaphnia dubia and Pimephales promelas). These systems performed efficiently with varied inflow simulations of FGD wastewaters removing As, Hg, and Se concentrations below NPDES permit levels and reducing the toxicity of simulated FGD wastewater after treatment with the constructed wetland treatment systems. Sequential extraction procedures indicated that these elements (As, Hg, and Se) were bound to residual phases within sediments of these systems, which should limit their bioavailability to aquatic biota. Sediments collected from constructed wetland treatment systems were tested to observe toxicity to Hyalella azteca or Chironomus tetans. Complete survival (100%) was observed for H. azteca in all cells of the constructed wetland treatment system and C. tentans had an average of 91% survival over the three treatment cells containing sediments. Survival and growth of H. azteca and C. tentans did not differ significantly between sediments from the constructed wetland treatment system and controls. Since the sediments of the constructed

  10. The Innovative Structure Solution for Preventing Salt Intrusion and Retaining Freshwater In Mekong Delta VietNam

    NARCIS (Netherlands)

    Hong, S.T.; Vrijling, J.K.; Stive, M.J.F.

    2013-01-01

    In the Mekong Delta Vietnam, the construction of sluices with the purpose of retaining fresh water and preventing salt water intrusion potentially plays a very important role. However, the structures constructed in small rivers according to local or traditional technology revealed many disadvantages

  11. Safety evaluation for packaging transportation of equipment for tank 241-C-106 waste sluicing system

    International Nuclear Information System (INIS)

    Calmus, D.B.

    1994-01-01

    A Waste Sluicing System (WSS) is scheduled for installation in nd waste storage tank 241-C-106 (106-C). The WSS will transfer high rating sludge from single shell tank 106-C to double shell waste tank 241-AY-102 (102-AY). Prior to installation of the WSS, a heel pump and a transfer pump will be removed from tank 106-C and an agitator pump will be removed from tank 102-AY. Special flexible receivers will be used to contain the pumps during removal from the tanks. After equipment removal, the flexible receivers will be placed in separate containers (packagings). The packaging and contents (packages) will be transferred from the Tank Farms to the Central Waste Complex (CWC) for interim storage and then to T Plant for evaluation and processing for final disposition. Two sizes of packagings will be provided for transferring the equipment from the Tank Farms to the interim storage facility. The packagings will be designated as the WSSP-1 and WSSP-2 packagings throughout the remainder of this Safety Evaluation for Packaging (SEP). The WSSP-1 packagings will transport the heel and transfer pumps from 106-C and the WSSP-2 packaging will transport the agitator pump from 102-AY. The WSSP-1 and WSSP-2 packagings are similar except for the length

  12. Rapid expression of transgenes driven by seed-specific constructs in leaf tissue: DHA production

    Directory of Open Access Journals (Sweden)

    Zhou Xue-Rong

    2010-03-01

    Full Text Available Abstract Background Metabolic engineering of seed biosynthetic pathways to diversify and improve crop product quality is a highly active research area. The validation of genes driven by seed-specific promoters is time-consuming since the transformed plants must be grown to maturity before the gene function can be analysed. Results In this study we demonstrate that genes driven by seed-specific promoters contained within complex constructs can be transiently-expressed in the Nicotiana benthamiana leaf-assay system by co-infiltrating the Arabidopsis thaliana LEAFY COTYLEDON2 (LEC2 gene. A real-world case study is described in which we first assembled an efficient transgenic DHA synthesis pathway using a traditional N. benthamiana Cauliflower Mosaic Virus (CaMV 35S-driven leaf assay before using the LEC2-extended assay to rapidly validate a complex seed-specific construct containing the same genes before stable transformation in Arabidopsis. Conclusions The LEC2-extended N. benthamiana assay allows the transient activation of seed-specific promoters in leaf tissue. In this study we have used the assay as a rapid preliminary screen of a complex seed-specific transgenic construct prior to stable transformation, a feature that will become increasingly useful as genetic engineering moves from the manipulation of single genes to the engineering of complex pathways. We propose that the assay will prove useful for other applications wherein rapid expression of transgenes driven by seed-specific constructs in leaf tissue are sought.

  13. Information System Specific in Achievement of Construction Projects

    Directory of Open Access Journals (Sweden)

    Cătălin Onuţu

    2005-01-01

    Full Text Available Because of the economic changes from our country and also of the rapid adjusting necessity to the requirement of a market economy, it is observed a huge request for information, and especially techniques, tools, methodologies that would facilitate the managerial activity in any field. In the construction field the problem is even more serious because of specific aspects and of the traditional information system that is very stiff. Formal and bureaucratic, and this makes the adjusting process of specialist to the economic realities to be more difficult.

  14. 7 CFR 1717.605 - Design standards, plans and specifications, construction standards, and RUS accepted materials.

    Science.gov (United States)

    2010-01-01

    ..., construction standards, and RUS accepted materials. 1717.605 Section 1717.605 Agriculture Regulations of the... standards, plans and specifications, construction standards, and RUS accepted materials. All borrowers... system design, construction standards, and the use of RUS accepted materials. Borrowers must comply with...

  15. W-320 Department of Health documentation

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    The purpose of this document is to gather information required to show that Project W-320 is in compliance with Washington State Department of Health requirements as specified in Radioactive Air Emissions Notice of Construction Project W-320, Tank 241-C-106 Sluicing, DOE/RL-95-45. Specifically, that W-320 is in compliance with ASME N509-1989 (Nuclear Power Plant Air-Cleaning Units and Components) and ASME N5 10-1989 (Testing of Nuclear Air Treatment Systems) for the 296-C-006 exhaust system

  16. W-320 Department of Health documentation

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-08-07

    The purpose of this document is to gather information required to show that Project W-320 is in compliance with Washington State Department of Health requirements as specified in Radioactive Air Emissions Notice of Construction Project W-320, Tank 241-C-106 Sluicing, DOE/RL-95-45. Specifically, that W-320 is in compliance with ASME N509-1989 (Nuclear Power Plant Air-Cleaning Units and Components) and ASME N5 10-1989 (Testing of Nuclear Air Treatment Systems) for the 296-C-006 exhaust system.

  17. Project W-320 ALARA Plan

    International Nuclear Information System (INIS)

    Harty, W.M.

    1995-01-01

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials

  18. Project W-320 ALARA Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harty, W.M.

    1995-06-06

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials.

  19. Specific features of modern multifunctional high-rise building construction

    Science.gov (United States)

    Manukhina, Lyubov; Samosudova, Natal'ja

    2018-03-01

    The article analyzes the main reasons for the development of high-rise building construction the most important of which-is a limitation of the urban areas and, consequently, the high price of land reserved for construction. New engineering and compositional solutions for the creation of new types of buildings are considered - complex technical designs of a large number of storeys completely meet the new requirements for safety and comfort. Some peculiarities of designing high-rise buildings and searching for optimal architectural and planning solutions are revealed since, with external architectural simplicity, high-rise buildings have complex structural and technological and space-planning solutions. We consider the specific features of a high-rise housing in various countries around the world, including Russia, such as the layout of the multi-storey residential buildings, depending on the climatic characteristics of the regions, assessment of the geological risk of the construction site, the choice of parameters and functional purpose of the sections of the territory of high-rise construction, location of the town-planning object for substantiating the overall dimensions of the building, assessment of changes aeration and engineering and hydrological conditions of the site. A special place in the article on the problems of improvement of the territory, the device of courtyards, landscaping, the device of playing and sports grounds. The main conclusion in the article is the following problem - when developing high-rise housing construction, the development of high-rise housing, and an increase in the population density in the territory of large cities of Russia, necessary to create a comfortable and safe level of residents living and not a decrease, but an improvement in the quality of the urban environment.

  20. Technical specification for transferring tank construction data to the Oak Ridge Environmental Information System (OREIS)

    International Nuclear Information System (INIS)

    1996-06-01

    The primary goal of this technical specification is to meet the consolidated environmental data requirements defined by the Federal Facility Agreement (FFA) and the Tennessee Oversight Agreement as they pertain to tank construction data maintained in Oak Ridge, Tennessee, by the US Department of Energy's Maintenance and Operations contractor Lockheed Martin Energy Systems, Inc., and prime contractors to the Department of Energy. This technical specification describes the organizational responsibilities for loading tank construction data into OREIS, describes the logical and physical data transfer files, addresses business rules and submission rules, addresses configuration control of this technical specification, and addresses required changes to the current OREIS data base structure based on site requirements. This technical specification addresses the tank construction data maintained by the Y-12, K-25, and ORNL sites that will be sent to OREIS. The initial submission of data will include only inactive Environmental Restoration tanks as specified by the FFA

  1. Specific character of sustainable innovative development of transport construction in self-regulation conditions

    Science.gov (United States)

    Gumba, Khuta; Belyaeva, Svetlana

    2017-10-01

    The providing of sustainable development is impossible without activating the innovative activity of backbone economical sectors, in particular of transport construction. The system of self-regulation of activities is a specific feature of the transport industry development. The authors carried out the correlation analysis of innovative activity of construction enterprises, which proved the necessity of improving the normative and technical documents. The authors proposed and calculated the index of the legislation stability in the industry. The article suggests recommendations on the activation of innovative development in construction industry basing on the results of the modeling.

  2. Construction for Nuclear Installations. Specific Safety Guide

    International Nuclear Information System (INIS)

    2015-01-01

    This Safety Guide provides recommendations and guidance based on international good practices in the construction of nuclear installations, which will enable construction to proceed with high quality. It can be applied to support the development, implementation and assessment of construction methods and procedures and the identification of good practices for ensuring the quality of the construction to meet the design intent and ensure safety. It will be a useful tool for regulatory bodies, licensees and new entrant countries for nuclear power plants and other nuclear installations

  3. Contingency plan for the Old Hydrofracture Facility tanks sluicing project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-10-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), plans to begin a sluicing (flushing) and pumping project to remove the contents from five inactive, underground storage tanks at the Old Hydrofracture Facility (OHF) at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The tank contents will be transferred to the Melton Valley Storage Tanks, which are part of the active waste treatment system at ORNL. The purpose of the project is to minimize the risk of leaking the highly radioactive material to the environment. The five OHF tanks each contain a layer of sludge and a layer of supernatant. Based on a sampling project undertaken in 1995, the sludge in the tanks has been characterized as transuranic and mixed waste and the supernatants have been characterized as mixed waste. The combined radioactivity of the contents of the five tanks is approximately 29,500 Ci. This contingency plan is based on the preliminary design for the project and describes a series of potential accident/release scenarios for the project. It outlines Energy Systems' preliminary plans for prevention, detection, and mitigation. Prevention/detection methods range from using doubly contained pipelines to alarmed sensors and automatic pump cutoff systems. Plans for mitigation range from pumping leaked fluids from the built-in tank drainage systems and cleaning up spilled liquids to personnel evacuation

  4. On constructing optimistic simulation algorithms for the discrete event system specification

    International Nuclear Information System (INIS)

    Nutaro, James J.

    2008-01-01

    This article describes a Time Warp simulation algorithm for discrete event models that are described in terms of the Discrete Event System Specification (DEVS). The article shows how the total state transition and total output function of a DEVS atomic model can be transformed into an event processing procedure for a logical process. A specific Time Warp algorithm is constructed around this logical process, and it is shown that the algorithm correctly simulates a DEVS coupled model that consists entirely of interacting atomic models. The simulation algorithm is presented abstractly; it is intended to provide a basis for implementing efficient and scalable parallel algorithms that correctly simulate DEVS models

  5. Discussion on Papers 11 - 13

    International Nuclear Information System (INIS)

    Haws, E.; Matthews, M.E.; Wilson, E.M.; Charles-Jones, S.; Allen, R.F.; Young, R.M.; O'Connor, B.

    1992-01-01

    The discussion covered the following topics: the nature of boulder clay for foundations; navigation through the barrage; the construction of sluice caissons; government subsidies for construction costs; the effect of wave action on river banks; allowances for reflected energy in hydrodynamic models; water quality in impounded pools; sediment deposition. Separate abstracts have been prepared for the three papers under discussion. (UK)

  6. Development of construction specifications to attain clean rooms for the NOVA laser facility

    International Nuclear Information System (INIS)

    Benedix, C.P.

    1980-02-01

    This paper describes the process of defining technical requirements for a major Department of Energy Research and Development Facility and subsequent development of construction specifications for the clean spaces in that facility. The organizational interactions between technical client, Engineering and Construction elements are described. The importance of an interdisciplinary team approach is stressed. A brief description of the SHIVA Laser and NOVA Laser Clean Spaces is included to indicate the scope of the facility undertaking. A number of potential pitfalls are discussed that may be helpful to designers of new facilities

  7. A theoretical and empirical framework for constructing culture-specific stigma instruments for Chile

    OpenAIRE

    Yang,Lawrence H.; Valencia,Elie; Alvarado,Ruben; Link,Bruce; Huynh,Nina; Nguyen,Kristy; Morita,Kara; Saavedra,Mariella; Wong,Chak; Galea,Sandro; Susser,Ezra

    2013-01-01

    Different cultural contexts contribute to substantial variation in the stigma faced by people with psychosis globally. We propose a new formulation of how culture affects stigma to create psychometrically-validated tools to assess stigma’s culture-specific effects. We propose to construct culture-specific stigma measures for the Chilean context via: 1) open-ended administration of ‘universal’ stigma scales to a sample of individuals with psychosis, relatives, and community respondents; 2) qua...

  8. Methodology and resources for the evaluation of the construction of knowledge about the concept of density and specific mass

    OpenAIRE

    Tânia Inácio de Oliveira; Nádia Vilela Pereira; Cláudio Boghi; Juliano Schimiguel; Dorlivete Moreira Shitsuka

    2017-01-01

    Abstract: The teaching of physics concepts involves the construction of knowledge in the students' minds. The aim of this article is to present a case report of teaching density and specific mass concepts in high school technical education classes. The study analyzes the results of the construction of methodology and development of a product so that teachers of Physics can give their students the construction of the concept of density of objects and the specific mass of the substances and per...

  9. Design, construction, and analysis of specific zinc finger nucleases for microphthalmia - associate transcription factor

    Directory of Open Access Journals (Sweden)

    Wenwen Wang

    2012-08-01

    Full Text Available This work studied the design, construction, and cleavage analysis of zinc finger nucleases (ZFNs that could cut the specific sequences within microphthalmia - associate transcription factor (mitfa of zebra fish. The target site and ZFPs were selected and designed with zinc finger tools, while the ZFPs were synthesized using DNAWorks and two-step PCR. The ZFNs were constructed, expressed, purified, and analyzed in vitro. As expected, the designed ZFNs could create a double-stand break (DSB at the target site in vitro. The DNAWorks, two-step PCR, and an optimized process of protein expression were firstly induced in the construction of ZFNs successfully, which was an effective and simplified protocol. These results could be useful for further application of ZFNs - mediated gene targeting.

  10. The effects of inspecting and constructing part-task-specific visualizations on team and individual learning

    NARCIS (Netherlands)

    Slof, Bert; Erkens, Gijsbert; Kirschner, Paul A.; Helms-Lorenz, Michelle

    This study examined whether inspecting and constructing different part-task-specific visualizations differentially affects learning. To this end, a complex business-economics problem was structured into three phase-related part-tasks: (1) determining core concepts, (2) proposing multiple solutions,

  11. Protocol for chromosome-specific probe construction using PRINS, micromanipulation and DOP-PCR techniques

    Directory of Open Access Journals (Sweden)

    PAULO Z. PASSAMANI

    2017-12-01

    Full Text Available ABSTRACT Chromosome-specific probes have been widely used in molecular cytogenetics, being obtained with different methods. In this study, a reproducible protocol for construction of chromosome-specific probes is proposed which associates in situ amplification (PRINS, micromanipulation and degenerate oligonucleotide-primed PCR (DOP-PCR. Human lymphocyte cultures were used to obtain metaphases from male and female individuals. The chromosomes were amplified via PRINS, and subcentromeric fragments of the X chromosome were microdissected using microneedles coupled to a phase contrast microscope. The fragments were amplified by DOP-PCR and labeled with tetramethyl-rhodamine-5-dUTP. The probes were used in fluorescent in situ hybridization (FISH procedure to highlight these specific regions in the metaphases. The results show one fluorescent red spot in male and two in female X chromosomes and interphase nuclei.

  12. A trial of a job-specific workers' health surveillance program for construction workers: study protocol.

    Science.gov (United States)

    Boschman, Julitta S; van der Molen, Henk F; van Duivenbooden, Cor; Sluiter, Judith K; Frings-Dresen, Monique H W

    2011-09-29

    Dutch construction workers are offered periodic health examinations. This care can be improved by tailoring this workers health surveillance (WHS) to the demands of the job and adjust the preventive actions to the specific health risks of a worker in a particular job. To improve the quality of the WHS for construction workers and stimulate relevant job-specific preventive actions by the occupational physician, we have developed a job-specific WHS. The job-specific WHS consists of modules assessing both physical and psychological requirements. The selected measurement instruments chosen, are based on their appropriateness to measure the workers' capacity and health requirements. They include a questionnaire and biometrical tests, and physical performance tests that measure physical functional capabilities. Furthermore, our job-specific WHS provides occupational physicians with a protocol to increase the worker-behavioural effectiveness of their counselling and to stimulate job-specific preventive actions. The objective of this paper is to describe and clarify our study to evaluate the behavioural effects of this job-specific WHS on workers and occupational physicians. The ongoing study of bricklayers and supervisors is a nonrandomised trial to compare the outcome of an intervention (job-specific WHS) group (n = 206) with that of a control (WHS) group (n = 206). The study includes a three-month follow-up. The primary outcome measure is the proportion of participants who have undertaken one or more of the preventive actions advised by their occupational physician in the three months after attending the WHS. A process evaluation will be carried out to determine context, reach, dose delivered, dose received, fidelity, and satisfaction. The present study is in accordance with the TREND Statement. This study will allow an evaluation of the behaviour of both the workers and occupational physician regarding the preventive actions undertaken by them within the scope of a job-specific

  13. Hydraulic structures

    CERN Document Server

    Chen, Sheng-Hong

    2015-01-01

    This book discusses in detail the planning, design, construction and management of hydraulic structures, covering dams, spillways, tunnels, cut slopes, sluices, water intake and measuring works, ship locks and lifts, as well as fish ways. Particular attention is paid to considerations concerning the environment, hydrology, geology and materials etc. in the planning and design of hydraulic projects. It also considers the type selection, profile configuration, stress/stability calibration and engineering countermeasures, flood releasing arrangements and scouring protection, operation and maintenance etc. for a variety of specific hydraulic structures. The book is primarily intended for engineers, undergraduate and graduate students in the field of civil and hydraulic engineering who are faced with the challenges of extending our understanding of hydraulic structures ranging from traditional to groundbreaking, as well as designing, constructing and managing safe, durable hydraulic structures that are economical ...

  14. Solid construction waste management in large civil construction companies through use of specific software - case study

    Directory of Open Access Journals (Sweden)

    Caio Dalla Zanna

    2017-05-01

    Full Text Available In the current construction market there is a high demand for sustainability. In addition to that the Brazilian government is enacting tougher and tougher legislation on the disposal of solid construction waste. These demands increasingly make the construction company responsible for the entire lifecycle of its waste as well as the accompanying cost and environmental impact of solid waste. A software program was used in the research which allows construction companies gather information about waste. This helps the decision makers, at all different levels of the company improving waste management through better decisions. The software program was used during the construction of two residential buildings, constructed by a large construction company in the South of Brazil. Five key performance indicators were used by the construction company team: Generated Waste Height (cm, cost per built area (R$ m-², Waste Segregation Quality Index (WSQI, Effective Waste Management Index (EWMI and Waste Management Quality Index (WMQI. After four months the total cost of waste management was R$ 83,551.71 for site A and R$ 91,668.02 for site B. About 70% of the waste was raw material waste. The software program provided information not previously available, which made it possible to calculate the cost of material loss, indicating corrective actions, all without losing sight of cost reduction opportunities for the management of Solid construction Waste (SCW.

  15. A trial of a job-specific workers' health surveillance program for construction workers: study protocol

    NARCIS (Netherlands)

    Boschman, J.S.; van der Molen, H.F.; van Duivenbooden, C.; Sluiter, J.K.; Frings-Dresen, M.H.W.

    2011-01-01

    Dutch construction workers are offered periodic health examinations. This care can be improved by tailoring this workers health surveillance (WHS) to the demands of the job and adjust the preventive actions to the specific health risks of a worker in a particular job. To improve the quality of the

  16. Solid construction waste management in large civil construction companies through use of specific software - case study

    OpenAIRE

    Caio Dalla Zanna; Fernando Fernandes; José Carlos Gasparine

    2017-01-01

    In the current construction market there is a high demand for sustainability. In addition to that the Brazilian government is enacting tougher and tougher legislation on the disposal of solid construction waste. These demands increasingly make the construction company responsible for the entire lifecycle of its waste as well as the accompanying cost and environmental impact of solid waste. A software program was used in the research which allows construction companies gather information about...

  17. A trial of a job-specific workers' health surveillance program for construction workers: study protocol

    Directory of Open Access Journals (Sweden)

    Sluiter Judith K

    2011-09-01

    Full Text Available Abstract Background Dutch construction workers are offered periodic health examinations. This care can be improved by tailoring this workers health surveillance (WHS to the demands of the job and adjust the preventive actions to the specific health risks of a worker in a particular job. To improve the quality of the WHS for construction workers and stimulate relevant job-specific preventive actions by the occupational physician, we have developed a job-specific WHS. The job-specific WHS consists of modules assessing both physical and psychological requirements. The selected measurement instruments chosen, are based on their appropriateness to measure the workers' capacity and health requirements. They include a questionnaire and biometrical tests, and physical performance tests that measure physical functional capabilities. Furthermore, our job-specific WHS provides occupational physicians with a protocol to increase the worker-behavioural effectiveness of their counselling and to stimulate job-specific preventive actions. The objective of this paper is to describe and clarify our study to evaluate the behavioural effects of this job-specific WHS on workers and occupational physicians. Methods/Design The ongoing study of bricklayers and supervisors is a nonrandomised trial to compare the outcome of an intervention (job-specific WHS group (n = 206 with that of a control (WHS group (n = 206. The study includes a three-month follow-up. The primary outcome measure is the proportion of participants who have undertaken one or more of the preventive actions advised by their occupational physician in the three months after attending the WHS. A process evaluation will be carried out to determine context, reach, dose delivered, dose received, fidelity, and satisfaction. The present study is in accordance with the TREND Statement. Discussion This study will allow an evaluation of the behaviour of both the workers and occupational physician regarding the

  18. Construction Method Study For Installation Of A Large Riser In A Single-Shell Tank

    International Nuclear Information System (INIS)

    Adkisson, D.A.

    2010-01-01

    This study evaluates and identifies a construction method for cutting a hole in a single-shell tank dome. This study also identifies and evaluates vendors for performing the cut. Single-shell tanks (SST) in the 241-C tank farm are currently being retrieved using various retrieval technologies (e.g., modified sluicing). The Hanford Federal Facility Agreement and Consent Order require that the SSTs be retrieved to less than 360 cubic feet of radioactive waste. The current technologies identified and deployed for tank retrieval have not been able to retrieve waste in accordance with the Hanford Federal Facility Agreement and Consent Order. As such, alternative retrieval systems have been proposed and are currently under construction that will have the ability to retrieve waste to this defined level. The proposed retrieval systems will not fit down existing risers. New risers will need to be installed to provide the retrieval systems access to the inside of the SSTs. The purpose of this study is two-fold. The first objective is to identify multiple concrete cutting technologies and perform an initial pre-screening, evaluate the technologies identified for more in-depth analysis, and recommend a technology/methodology for cutting a hole in the tank dome. The identified/pre-screened methods will be evaluated based on the following criteria: (1) Maturity/complexity; (2) Waste generation; (3) Safety; (4) Cost; and (5) Schedule. Once the preferred method is identified to cut the hole in the tank dome, the second objective is to identify, evaluate, and recommend a vendor for the technology selected that will perform the cutting process.

  19. Old hydrofracture facility tanks contents removal action operations plan at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 1: Text

    International Nuclear Information System (INIS)

    1998-05-01

    This Operations Plan summarizes the operating activities for transferring contents of five low-level (radioactive) liquid waste storage tanks associated with the Old Hydrofracture Facility (OHF) to the Melton Valley Storage Tanks (MVST) for secure storage. The transfer will be accomplished through sluicing and pumping operations which are designed to pump the slurry in a closed circuit system using a sluicing nozzle to resuspend the sludge. Once resuspended, the slurry will be transferred to the MVST. The report documenting the material transfer will be prepared after transfer of the tank materials has been completed. The OBF tanks contain approximately 52,600 gal (199,000 L) of low-level radioactive waste consisting of both sludge and supernatant. This material is residual from the now-abandoned grout injection operations conducted from 1964 to 1980. Total curie content is approximately 30,000 Ci. A sluicing and pumping system has been specifically designed for the OHF tanks contents transfer operations. This system is remotely operated and incorporates a sluicing nozzle and arm (Borehole Miner) originally designed for use in the mining industry. The Borehole Miner is an in-tank device designed to deliver a high pressure jet spray via an extendable nozzle. In addition to removing the waste from the tanks, the use of this equipment will demonstrate applicability for additional underground storage tank cleaning throughout the U.S. Department of Energy complex. Additional components of the complete sluicing and pumping system consist of a high pressure pumping system for transfer to the MVST, a low pressure pumping system for transfer to the recycle tank, a ventilation system for providing negative pressure on tanks, and instrumentation and control systems for remote operation and monitoring

  20. 75 FR 32313 - Specifications and Drawings for Construction Direct Buried Plant

    Science.gov (United States)

    2010-06-08

    ... construction units for Fiber-to-the-Home, remove redundant or outdated requirements, and simplify the.... Because of Fiber-to-the-Home construction and advancements made in construction installation methods and... Construction Direct Buried Plant AGENCY: Rural Utilities Service, USDA. ACTION: Proposed Rule. SUMMARY: The...

  1. Gunite and associated tanks dry well conductivity monitoring report, Oak Ridge National Laboratory, Oak Ridge, Tennessee, February 1998 - December 1998

    International Nuclear Information System (INIS)

    1999-04-01

    A waste removal program is being implemented for the Gunite and Associated Tanks Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee. The waste is being removed by means of remotely operated, in-tank, confined sluicing equipment. During sluicing operations the dry wells adjacent to each of the tanks are instrumented so that potential releases can be detected by means external to the tank. The method of detection is by monitoring the electrical conductivity of the water in the dry well associated with each tank. This report documents the dry well conductivity monitoring data for the period from February 1998 through December 1998. The dry wells monitored during this period include DW-5, DW-6, DW-7, DW-8, DW-9 and DW-10. The conductivity of the water passing through Pump Station 1 (PS1) was also monitored. During this period the sluicing activities at Tank W-6 were initiated and successfully completed. In addition, flight mixers were used to remove wastes from Tank W-5, and sluicing operations were initiated on Tank W-7. Presented in this report are the dry well conductivity, rainfall, tank level, and other appropriate information relevant to the analysis and interpretation of the monitoring data for the reporting period. A thorough analysis of the monitoring results from the six dry wells in the STF and PS1 for the period between February 1998 and December 1998 indicates that no releases have occurred from the gunite tanks being monitored. Overall, the dry well conductivity monitoring continues to provide a robust and sensitive method for detecting potential releases from the gunite tanks and for monitoring seasonal and construction-related changes in the dry well and drain system

  2. HANFORD TANK CLEANUP UPDATE MAY 2009

    International Nuclear Information System (INIS)

    Holloway, J.N.

    2009-01-01

    Retrieval of waste from single-shell tank C-110 resumed in January making it the first waste retrieval operation for WRPS since taking over Hanford's Tank Operations Contract last October. Now, with approximately 90 percent of the waste removed, WRPS believes that modified sluicing has reached the limits of the technology to remove any further waste and is preparing documentation for use in decision making about any future retrieval actions. Tank C-110 is located in C Fann near the center of the Hanford Site. It is a 530,000 gallon tank, built in 1946, and held approximately 126,000 gallons of sludge and other radioactive and chemical waste materials when retrieval resumed. Modified sluicing technology uses liquid waste from a nearby double-shell tank to break up, dissolve and mobilize the solid material so it can be pumped. Because of the variety of waste fon11S, sluicing is often not able to remove all of the waste. The remaining waste will next be sampled for analysis, and results will be used to guide decisions regarding future actions. Work is moving rapidly in preparation to retrieve waste from a second single-shell tank this summer and transfer it to safer double-shell tank storage. Construction activities necessary to retrieve waste from Tank C-104, a 530,000 gallon tank built in 1943, are approximately 60 percent complete as WRPS maintains its focus on reducing the risk posed by Hanford's aging single-shell waste tanks. C-104 is one of Hanford's oldest radioactive and chemical waste storage tanks, containing approximately 263,000 gallons of wet sludge with a top layer that is dry and powdery. This will be the largest sludge volume retrieval ever attempted using modified sluicing technology. Modified sluicing uses high pressure water or liquid radioactive waste sprayed from nozzles above the waste. The liquid dissolves and/or mobilizes the waste so it can be pumped. In addition to other challenges, tank C-104 contains a significant amount of plutonium and

  3. Best management practices plan for the Chestnut Ridge-Filled Coal Ash Pond at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-05-01

    The Chestnut Ridge Filled Coal Ash Pond (FCAP) Project has been established to satisfy Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements for the Chestnut Ridge Operable Unit 2. FCAP is on Chestnut Ridge, approximately 0.5 miles south of the Y-12 Plant. A 62-foot high earthen dam across Upper McCoy Branch was constructed in 1955 to create a pond to serve as a settling basin for fly and bottom ashes generated by burning coal at the Y-12 Steam Plant. Ash from the steam was mixed with water to form a slurry and then pumped to the crest of Chestnut Ridge and released through a large pipe to flow across the Sluice Channel area and into the pond. The ash slurry eventually overtopped the dam and flowed along Upper McCoy Branch to Rogers Quarry. The purpose of this document is to provide a site-specific Best Management Practices (BMP) Plan for construction associated with environmental restoration activities at the FCAP Site

  4. Computational design, construction, and characterization of a set of specificity determining residues in protein-protein interactions.

    Science.gov (United States)

    Nagao, Chioko; Izako, Nozomi; Soga, Shinji; Khan, Samia Haseeb; Kawabata, Shigeki; Shirai, Hiroki; Mizuguchi, Kenji

    2012-10-01

    Proteins interact with different partners to perform different functions and it is important to elucidate the determinants of partner specificity in protein complex formation. Although methods for detecting specificity determining positions have been developed previously, direct experimental evidence for these amino acid residues is scarce, and the lack of information has prevented further computational studies. In this article, we constructed a dataset that is likely to exhibit specificity in protein complex formation, based on available crystal structures and several intuitive ideas about interaction profiles and functional subclasses. We then defined a "structure-based specificity determining position (sbSDP)" as a set of equivalent residues in a protein family showing a large variation in their interaction energy with different partners. We investigated sequence and structural features of sbSDPs and demonstrated that their amino acid propensities significantly differed from those of other interacting residues and that the importance of many of these residues for determining specificity had been verified experimentally. Copyright © 2012 Wiley Periodicals, Inc.

  5. Development and testing of single-shell tank waste retrieval technologies: Milestone M-45-01 summary report

    International Nuclear Information System (INIS)

    Shen, E.J.

    1994-08-01

    This report summarizes the activities undertaken to develop single-shell tank (SST) waste retrieval technology and complete scale-model testing. Completion of these activities fulfills the commitment of Milestone M-45-01 of the Hanford Federal Facility Agreement and Consent Order (the Tri-Party Agreement). Initial activities included engineering studies that compiled and evaluated data on all known retrieval technologies. Based on selection criteria incorporating regulatory, safety, and operational issues, several technologies were selected for further evaluation and testing. The testing ranged from small-scale, bench-top evaluations of individual technologies to full-scale integrated tests of multiple subsystems operating concurrently as a system using simulated wastes. The current baseline retrieval method for SSTs is hydraulic sluicing. This method has been used successfully in the past to recover waste from SSTs. Variations of this hydraulic or ''past practice'' sluicing may be used to retrieve the waste from the majority of the SSTs. To minimize the potential for releases to the soil, arm-based retrieval systems may be used to recover waste from tanks that are known or suspected to have leaked. Both hydraulic sluicing and arm-based retrieval will be demonstrated in the first SST. Hydraulic sluicing is expected to retrieve most of the waste, and arm-based retrieval will retrieve wastes that remain after sluicing. Subsequent tanks will be retrieved by either hydraulic sluicing or arm-based methods, but not both. The method will be determined by waste characterization, tank integrity (leak status), and presence of in-tank hardware. Currently, it is assumed that approximately 75% of all SSTs will be retrieved by hydraulic sluicing and the remaining tanks by arm-based methods

  6. Construction of a specification from its singleton part

    NARCIS (Netherlands)

    Fernández, R.; Maillard, G.

    2006-01-01

    We state a construction theorem for specications starting from single-site conditional probabilities (singleton part). We consider general single-site spaces and kernels that are absolutely continuous with respect to a chosen product mea- sure (free measure). Under a natural order-consistency

  7. Cell-type specific oxytocin gene expression from AAV delivered promoter deletion constructs into the rat supraoptic nucleus in vivo.

    Directory of Open Access Journals (Sweden)

    Raymond L Fields

    Full Text Available The magnocellular neurons (MCNs in the hypothalamus selectively express either oxytocin (OXT or vasopressin (AVP neuropeptide genes, a property that defines their phenotypes. Here we examine the molecular basis of this selectivity in the OXT MCNs by stereotaxic microinjections of adeno-associated virus (AAV vectors that contain various OXT gene promoter deletion constructs using EGFP as the reporter into the rat supraoptic nucleus (SON. Two weeks following injection of the AAVs, immunohistochemical assays of EGFP expression from these constructs were done to determine whether the EGFP reporter co-localizes with either the OXT- or AVP-immunoreactivity in the MCNs. The results show that the key elements in the OT gene promoter that regulate the cell-type specific expression the SON are located -216 to -100 bp upstream of the transcription start site. We hypothesize that within this 116 bp domain a repressor exists that inhibits expression specifically in AVP MCNs, thereby leading to the cell-type specific expression of the OXT gene only in the OXT MCNs.

  8. Construction Management.

    Science.gov (United States)

    Abbott, James F.

    This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction…

  9. FFTF constructibility

    International Nuclear Information System (INIS)

    Weber, S.A.; Hulbert, D.I.

    1975-01-01

    The influence of the design criteria on the constructibility of the Fast Flux Test Facility is described. Specifically, the effects of requirements due to maintenance accessibility, inerting of cells, seismicity, codes, and standards are addressed. The design and construction techniques developed to minimize the impact of the design criteria on cost and schedule are presented with particular emphasis on the cleanliness and humidity controls imposed during construction of the sodium systems. (U.S.)

  10. Discussion on Papers 3 and 4

    International Nuclear Information System (INIS)

    Mitchell, H.; Haigh, G.W.R.; Jenkins, E.

    1992-01-01

    The topics raised in the discussion covered: the accuracy of the cost estimates for the project; the number of sluices to be used; factors controlling the selection of steel or concrete for caisson construction and the design life of the caissons; the type of gates and lock mechanism; shipping traffic forecasts; and the effect of the barrage on port operations. Separate abstracts have been prepared for the two papers under discussion. (UK)

  11. Decision analysis for the selection of tank waste retrieval technology

    International Nuclear Information System (INIS)

    DAVIS, FREDDIE J.; DEWEESE, GREGORY C.; PICKETT, WILLIAM W.

    2000-01-01

    The objective of this report is to supplement the C-104 Alternatives Generation and Analysis (AGA) by providing a decision analysis for the alternative technologies described therein. The decision analysis used the Multi-Attribute Utility Analysis (MUA) technique. To the extent possible information will come from the AGA. Where data are not available, elicitation of expert opinion or engineering judgment is used and reviewed by the authors of the AGA. A key element of this particular analysis is the consideration of varying perspectives of parties interested in or affected by the decision. The six alternatives discussed are: sluicing; sluicing with vehicle mounted transfer pump; borehole mining; vehicle with attached sluicing nozzle and pump; articulated arm with attached sluicing nozzle; and mechanical dry retrieval. These are evaluated using four attributes, namely: schedule, cost, environmental impact, and safety

  12. 75 FR 59933 - Specifications and Drawings for Construction of Direct Buried Plant

    Science.gov (United States)

    2010-09-29

    ... include new construction units for Fiber-to-the-Home, remove redundant or outdated requirements, and... in Fiber-to-the-Home construction as well as installation methods and materials. In order for... for Construction of Direct Buried Plant AGENCY: Rural Utilities Service, USDA. ACTION: Final rule...

  13. Predictive, Construct, and Convergent Validity of General and Domain-Specific Measures of Hope for College Student Academic Achievement

    Science.gov (United States)

    Robinson, Cecil; Rose, Sage

    2010-01-01

    One leading version of hope theory posits hope to be a general disposition for goal-directed agency and pathways thinking. Domain-specific hope theory suggests that hope operates within context and measures of hope should reflect that context. This study examined three measures of hope to test the predictive, construct, and convergent validity…

  14. RAPS: Robust and Efficient Automatic Construction of Person-Specific Deformable Models

    NARCIS (Netherlands)

    Sagonas, Christos; Panagakis, Yannis; Zafeiriou, Stefanos; Pantic, Maja

    The construction of Facial Deformable Models (FDMs) is a very challenging computer vision problem, since the face is a highly deformable object and its appearance drastically changes under different poses, expressions, and illuminations. Although several methods for generic FDMs construction, have

  15. Specificity of high-rise construction and real estate markets in the regional economy: an analysis of Russian practice (example of St. Petersburg)

    Science.gov (United States)

    Vilken, Viktoriya; Kalinina, Olga; Dubgorn, Alissa

    2018-03-01

    In paper features of the regional markets of construction the commercial and residential real estate on the example of St. Petersburg are defined. The current situation is analysed, the specific features of branch are revealed. The major factors influencing investors making decisions on construction of various types of objects are defined. The main methods of advance of real estate objects are considered.

  16. Experimental evaluation and design of unfilled and concrete-filled FRP composite piles : Task 4B : material & construction specifications : final report.

    Science.gov (United States)

    2015-07-01

    The overall goal of this project is the experimental evaluation and design of unfilled and concrete-filled FRP composite piles for load-bearing in bridges. This report covers Task 4B, Materials and Construction Specifications. : This technical report...

  17. Construction mathematics

    CERN Document Server

    Virdi, Surinder; Virdi, Narinder Kaur

    2014-01-01

    Construction Mathematics is an introductory level mathematics text, written specifically for students of construction and related disciplines. Learn by tackling exercises based on real-life construction maths. Examples include: costing calculations, labour costs, cost of materials and setting out of building components. Suitable for beginners and easy to follow throughout. Learn the essential basic theory along with the practical necessities. The second edition of this popular textbook is fully updated to match new curricula, and expanded to include even more learning exercises. End of chapter exercises cover a range of theoretical as well as practical problems commonly found in construction practice, and three detailed assignments based on practical tasks give students the opportunity to apply all the knowledge they have gained. Construction Mathematics addresses all the mathematical requirements of Level 2 construction NVQs from City & Guilds/CITB and Edexcel courses, including the BTEC First Diploma in...

  18. Construction and application of a zinc-specific biosensor for assessing the immobilization and bioavailability of zinc in different soils

    International Nuclear Information System (INIS)

    Liu Pulin; Huang Qiaoyun; Chen Wenli

    2012-01-01

    The inducibility and specificity of different czcRS operons in Pseudomonas putida X4 were studied by lacZ gene fusions. The data of β-glycosidase activity confirmed that the czcR3 promoter responded quantitatively to zinc. A zinc-specific biosensor, P. putida X4 (pczcR3GFP), was constructed by fusing a promoterless enhanced green fluorescent protein (egfp) gene with the czcR3 promoter in the chromosome of P. putida X4. In water extracts of four different soils amended with zinc, the reporter strain detected about 90% of the zinc content of the samples. Both the bioavailability assessment and the sequential extraction analysis demonstrated that the immobilization of zinc was highly dependent on the physico-chemical properties of soils. The results also showed that the lability of zinc decreased over time. It is concluded that the biosensor constitutes an alternative system for the convenient evaluation of zinc toxicity in the environment. - Highlights: ► A zinc-specific bacterial biosensor was developed. ► Four spiked soils were used to test the application of this biosensor. ► The bioavailable zinc in soil-water extracts decreased due to aging. ► The immobilization and speciation of zinc were highly dependent on the soil type. - The immobilization and bioavailability of zinc in soil were investigated as a function of soil type and aging by a newly constructed zinc-specific biosensor coupled with chemical analysis.

  19. Research into the Eutrophication of an Artificial Playground Lake near the Yangtze River

    Directory of Open Access Journals (Sweden)

    Min Pang

    2018-03-01

    Full Text Available Water pollution in urban rivers is serious in China. Eutrophication and other issues are prominent. Taking the artificial Playground Lake in Zhenjiang as an example, a numerical model combining particle tracing, hydrodynamics, water quality and eutrophication was constructed to simulate the water quality improvement in Playground Lake with or without water diversion by pump and sluice. Simulation results using particle tracking showed that the water residence time depended on wind direction: east wind, 125 h; southeast wind, 115 h; south wind, 95 h. With no water diversion, the lower the flow velocity of Playground Lake under three wind fields, the more serious the eutrophication. Under pump diversion, the water body in Playground Lake can be entirely replaced by water diversion for 30 h. When the temperature is lower than 15 °C, from 15 °C to 25 °C and higher than 25 °C, the water quality can be maintained for 15 d, 10 d and 7 d, respectively. During high tide periods of spring tides in the Yangtze River from June to August, the water can be diverted into the lake through sluices. The greater the Δh (the water head between the Yangtze River and Playground Lake, the more the water quality will improve. Overall, the good-to-bad order of water quality improvements for Playground Lake is as follows: pumping 30 h > sluice diversion > no water diversion. This article is relevant for the environmental management of the artificial Playground Lake, and similar lakes elsewhere.

  20. Safety equipment list for 241-C-106 waste retrieval, Project W-320: Revision 1

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    The goals of the C-106 sluicing operation are: (1) to stabilize the tank by reducing the heat load in the tank to less than 42 MJ/hr (40,000 Btu/hour), and (2) to initiate demonstration of single-shell tank (SST) retrieval technology. The purpose of this supporting document (SD) is as follows: (1) to provide safety classifications for items (systems, structures, equipment, components, or parts) for the waste retrieval sluicing system (WRSS), and (2) to document and methodology used to develop safety classifications. Appropriate references are made with regard to use of existing systems, structures, equipments, components, and parts for C-106 single-shell transfer tank located in the C Tank Farm, and 241-AY-102 (AY-102) double shell receiver tanks (DST) located in the Aging Waste Facility (AWF). The Waste Retrieval Sluicing System consists of two transfer lines that would connect the two tanks, one to carry the sluiced waste slurry to AY-102, and the other to return the supernatant liquid to C-106. The supernatant, or alternate fluid, will be used to mobilize waste in C-106 for the sluicing process. The equipment necessary for the WRSS include pumps in each tank, sluicers to direct the supernatant stream in C-106, a slurry distributor in AY-102, HVAC for C-106, instrumentation and control devices, and other existing components as required

  1. Grammatical Constructions as Relational Categories.

    Science.gov (United States)

    Goldwater, Micah B

    2017-07-01

    This paper argues that grammatical constructions, specifically argument structure constructions that determine the "who did what to whom" part of sentence meaning and how this meaning is expressed syntactically, can be considered a kind of relational category. That is, grammatical constructions are represented as the abstraction of the syntactic and semantic relations of the exemplar utterances that are expressed in that construction, and it enables the generation of novel exemplars. To support this argument, I review evidence that there are parallel behavioral patterns between how children learn relational categories generally and how they learn grammatical constructions specifically. Then, I discuss computational simulations of how grammatical constructions are abstracted from exemplar sentences using a domain-general relational cognitive architecture. Last, I review evidence from adult language processing that shows parallel behavioral patterns with expert behavior from other cognitive domains. After reviewing the evidence, I consider how to integrate this account with other theories of language development. Copyright © 2017 Cognitive Science Society, Inc.

  2. Towards green construction

    International Nuclear Information System (INIS)

    Bajracharya, Bijaya B.; Shrestha, Prasanna M.

    2000-01-01

    Sustainability is the key to any development works. In the operation phase, hydro power is the most sustainable form of energy. However construction activities for the same power station are usually far from being green. The popular myth is that construction activity converts green into grey. Despite this popular myth, construction of a hydro power project in Nepal has made the project area greener than earlier during the construction phase itself. Choice of construction technology, appropriate level of environmental impact assessment, monitoring of environmental parameters along side the construction progress followed by mitigation at the right time; launching community development programmes side by side, having environmental specification in contractual documents and self-reliance to fulfill environmental obligations by contractors itself are the key factors in the environmental management within the construction activities. The main conclusions in the paper is the need to change the way to think about the project constraints

  3. AUTOMATA PROGRAMS CONSTRUCTION FROM SPECIFICATION WITH AN ANT COLONY OPTIMIZATION ALGORITHM BASED ON MUTATION GRAPH

    Directory of Open Access Journals (Sweden)

    Daniil S. Chivilikhin

    2014-11-01

    Full Text Available The procedure of testing traditionally used in software engineering cannot guarantee program correctness; therefore verification is used at the excess requirements to programs reliability. Verification makes it possible to check certain properties of programs in all possible computational states; however, this process is very complex. In the model checking method a model of the program is built (often, manually and requirements in terms of temporal logic are formulated. Such temporal properties of the model can be checked automatically. The main issue in this framework is the gap between the program and its model. Automata-based programming paradigm gives the possibility to overcome this limitation. In this paradigm, program logic is represented using finite-state machines. The advantage of finite-state machines is that their models can be constructed automatically. The paper deals with the application of mutation-based ant colony optimization algorithm to the problem of finite-state machine construction from their specification, defined by test scenarios and temporal properties. The presented approach has been tested on the elevator doors control problem as well as on randomly generated data. Obtained results show the ant colony algorithm is two-three times faster than the previously used genetic algorithm. The proposed approach can be recommended for inferring control programs for critical systems.

  4. Radiological and toxicological calculations for AY-102 and C-106HEPA filters and pre-filters

    International Nuclear Information System (INIS)

    Simpson, T.R.; Van Vleet, R.J.

    1997-01-01

    The high heat content solids in Tank 241-C-106 are to be removed and transferred to Tank 241-AY-102 by sluicing operations, to be authorized under project W-320. Once sluicing operations are underway, the state of these tanks will be transformed from 'unagitated' to 'agitated'. This means that the partition fraction which described the aerosol content of the head space will increase from 1 X 10 - 20 to 1 X 10 -1 . This head space will become much more loaded with suspended material. The nature of this suspended material may change significantly, sluicing may inadvertently bring up radioactive solids which normally would lay under many meters of liquid supernate. It is an enabling assumption that the headspace and filter aerosols in Tank 241-AY-102 are a 90/10 liquid/solid split; there is an unmitigated and mitigated composition. It is an enabling assumption that the sluicing line; the headspace in Tank 241-C-106, and the filters in Tank 241-C-106 contain aerosols which are a 67/33 liquid/solid split; there is an unmitigated and mitigated composition

  5. Consequences of a radioactive surface pool resulting from waste transfer operations between tanks 214-C-106 and 241-AY-102

    International Nuclear Information System (INIS)

    Van Vleet, R.J.

    1997-01-01

    This document contains supporting calculations for quantifying the dose consequences from a pool formed from an underground leak or a-leak from an above grade structure for the Waste Retrieval Sluicing System (Project W-320), i.e., sluicing the contents of Tank 241-C-106 (high heat, SST) into Tank 241-AY-102 (aging waste, DST)

  6. Consequences of a radioactive surface pool resulting from waste transfer operations between tanks 214-C-106 and 241-AY-102

    Energy Technology Data Exchange (ETDEWEB)

    Van Vleet, R.J.

    1997-08-05

    This document contains supporting calculations for quantifying the dose consequences from a pool formed from an underground leak or a-leak from an above grade structure for the Waste Retrieval Sluicing System (Project W-320), i.e., sluicing the contents of Tank 241-C-106 (high heat, SST) into Tank 241-AY-102 (aging waste, DST).

  7. The relationship between macroeconomic and industry-specific business cycle indicators and work-related injuries among Danish construction workers.

    Science.gov (United States)

    Nielsen, Kent Jacob; Lander, F; Lauritsen, J M

    2015-04-01

    The current study examines and compares the relationship between both macroeconomic and industry-specific business cycle indicators, and work-related injuries among construction workers in Denmark using emergency department (ED) injury data and also officially reported injuries to the Danish Working Environment Authority (WEA). The correlations between ED and WEA injury data from the catchment area of Odense University Hospital during the period 1984-2010 were tested separately for variability and trend with two general macroeconomic indicators (gross domestic product and the Danish unemployment rate) and two construction industry-specific indicators (gross value added and the number of employees). The results show that injury rates increase during economic booms and decrease during recessions. However, the regression coefficients were generally weak for both the ED (range 0.14-0.20) and WEA injuries (range 0.13-0.36). Furthermore, although there is some variability in the strength of the relationship of the different business cycle indicators, the relationships are generally not stronger for the WEA injuries than for the ED injuries, except for general unemployment. Similarly, no substantial differences in strength of relation between industry-specific and macroeconomic indicators were identified. The study shows that there was no difference in the relationship between business cycle indicators, and WEA and ED injury data. This indicates that changes in reporting behaviour do not seem to play a major role in the relation between the business cycle and workplace injuries in a Danish context. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  8. Structural Impact of Construction Loads

    Science.gov (United States)

    2012-08-01

    Numerous bridge construction accidents have occurred across the country because of construction loadings, which are an underemphasized : topic in many DOT specifications and design manuals. Bridge girders are least stable when they are subjected to c...

  9. Construction and accuracy assessment of patient-specific biocompatible drill template for cervical anterior transpedicular screw (ATPS insertion: an in vitro study.

    Directory of Open Access Journals (Sweden)

    Maoqing Fu

    Full Text Available BACKGROUND: With the properties of three-column fixation and anterior-approach-only procedure, anterior transpedicular screw (ATPS is ideal for severe multilevel traumatic cervical instabilities. However, the accurate insertion of ATPS remains challenging. Here we constructed a patient-specific biocompatible drill template and evaluated its accuracy in assisting ATPS insertion. METHODS: After ethical approval, 24 formalin-preserved cervical vertebrae (C2-C7 were CT scanned. 3D reconstruction models of cervical vertebra were obtained with 2-mm-diameter virtual pin tracts at the central pedicles. The 3D models were used for rapid prototyping (RP printing. A 2-mm-diameter Kirschner wire was then inserted into the pin tract of the RP model before polymethylmethacrylate was used to construct the patient-specific biocompatible drill template. After removal of the anterior soft tissue, a 2-mm-diameter Kirschner wire was inserted into the cervical pedicle with the assistance of drill template. Cadaveric cervical spines with pin tracts were subsequently scanned using the same CT scanner. A 3D reconstruction was performed of the scanned spines to get 3D models of the vertebrae containing the actual pin tracts. The deviations were calculated between 3D models with virtual and actual pin tracts at the middle point of the cervical pedicle. 3D models of 3.5 mm-diameter screws were used in simulated insertion to grade the screw positions. FINDINGS: The patient-specific biocompatible drill template was constructed to assist ATPS insertion successfully. There were no significant differences between medial/lateral deviations (P = 0.797 or between superior/inferior deviations (P = 0.741. The absolute deviation values were 0.82±0.75 mm and 1.10±0.96 mm in axial and sagittal planes, respectively. In the simulated insertion, the screws in non-critical position were 44/48 (91.7%. CONCLUSIONS: The patient-specific drill template is biocompatible, easy

  10. 46 CFR 160.002-4 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.002-4 Section 160.002-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... and 5 § 160.002-4 Construction. (a) General. This specification covers life preservers which...

  11. 46 CFR 161.012-7 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 161.012-7 Section 161.012-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Personal Flotation Device Lights § 161.012-7 Construction. (a...

  12. 46 CFR 160.174-9 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.174-9 Section 160.174-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Thermal Protective Aids § 160.174-9 Construction. (a) General...

  13. 46 CFR 160.171-9 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.171-9 Section 160.171-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Immersion Suits § 160.171-9 Construction. (a) General. Each...

  14. 46 CFR 160.042-3 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.042-3 Section 160.042-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Skids, Liferaft, for Merchant Vessels § 160.042-3 Construction...

  15. 46 CFR 160.047-4 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.047-4 Section 160.047-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... and Child § 160.047-4 Construction. (a) General. This specification covers buoyant vests which...

  16. 46 CFR 160.176-9 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.176-9 Section 160.176-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Lifejackets § 160.176-9 Construction. (a) General...

  17. 46 CFR 160.053-3 - Materials, construction and workmanship.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, construction and workmanship. 160.053-3..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Work Vests, Unicellular Plastic Foam § 160.053-3 Materials, construction and workmanship. (a) General. Except as otherwise specifically...

  18. 46 CFR 160.005-4 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.005-4 Section 160.005-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS...), Models 52 and 56 § 160.005-4 Construction. (a) General. This specification covers life preservers which...

  19. 46 CFR 160.056-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.056-2 Section 160.056-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Rescue Boat § 160.056-2 Construction. (a) General. Rescue boats...

  20. 46 CFR 160.017-13 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.017-13 Section 160.017-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Chain Ladder § 160.017-13 Construction. (a) General. Each chain...

  1. Radiation hybrids from human chromosome 3: A basis for the construction of region and specific sublibraries

    International Nuclear Information System (INIS)

    Atchison, L.; Cosmis, R.L.; Atchison, M.L.

    1990-01-01

    The authors are interested in identifying genes on human chromosome involved in disease processes. To date at least 20 different loci on this chromosome are implicated with various disease states. DNA libraries containing clones derived from a small chromosomal subregion implicated in a particular disease would greatly assist these studies. They have utilized the radiation hybrid (RH) technique to generate a series of somatic cell hybrids that contain small segments of human chromosome 3 as the only human genetic material. A Chinese hamster-human cell hybrid (Q314-2) containing only human chromosome 3 was used to prepare radiation hybrids. Cells were lethally X-irradiated with 6,000 rads and fused to Urd(??) Chinese hamster cells by PEG 1000 treatment. The majority of hybrids (>72%) analyzed retained portions of chromosome 3. The amount of chromosome 3 in each hybrid ranged from nearly all of the chromosome to very little. Currently these hybrids are being further characterized with single copy probes of known map location in order to isolate regions of chromosome 3 that contain specific disease locus. These reduced hybrids can then be used for the construction of region specific libraries and for the generation of new DNA probes from the specific region of interest

  2. The relationship between macroeconomic and industry-specific business cycle indicators and work-related injuris among Danish construction workers

    DEFF Research Database (Denmark)

    Nielsen, Kent Jacob; Lander, Flemming; Lauritsen, Jens

    2015-01-01

    Objectives The current study examines and compares the relationship between both macroeconomic and industry-specific business cycle indicators, and work-related injuries among construction workers in Denmark using emergency department (ED) injury data and also officially reported injuries...... (range 0.14–0.20) and WEA injuries (range 0.13–0.36). Furthermore, although there is some variability in the strength of the relationship of the different business cycle indicators, the relationships are generally not stronger for the WEA injuries than for the ED injuries, except for general unemployment....... Similarly, no substantial differences in strength of relation between industry-specific and macroeconomic indicators were identified. Conclusions The study shows that there was no difference in the relationship between business cycle indicators, and WEA and ED injury data. This indicates that changes...

  3. Construction of physical maps for the sex-specific regions of papaya sex chromosomes

    Directory of Open Access Journals (Sweden)

    Na Jong-Kuk

    2012-05-01

    Full Text Available Abstract Background Papaya is a major fruit crop in tropical and subtropical regions worldwide. It is trioecious with three sex forms: male, female, and hermaphrodite. Sex determination is controlled by a pair of nascent sex chromosomes with two slightly different Y chromosomes, Y for male and Yh for hermaphrodite. The sex chromosome genotypes are XY (male, XYh (hermaphrodite, and XX (female. The papaya hermaphrodite-specific Yh chromosome region (HSY is pericentromeric and heterochromatic. Physical mapping of HSY and its X counterpart is essential for sequencing these regions and uncovering the early events of sex chromosome evolution and to identify the sex determination genes for crop improvement. Results A reiterate chromosome walking strategy was applied to construct the two physical maps with three bacterial artificial chromosome (BAC libraries. The HSY physical map consists of 68 overlapped BACs on the minimum tiling path, and covers all four HSY-specific Knobs. One gap remained in the region of Knob 1, the only knob structure shared between HSY and X, due to the lack of HSY-specific sequences. This gap was filled on the physical map of the HSY corresponding region in the X chromosome. The X physical map consists of 44 BACs on the minimum tiling path with one gap remaining in the middle, due to the nature of highly repetitive sequences. This gap was filled on the HSY physical map. The borders of the non-recombining HSY were defined genetically by fine mapping using 1460 F2 individuals. The genetically defined HSY spanned approximately 8.5 Mb, whereas its X counterpart extended about 5.4 Mb including a 900 Kb region containing the Knob 1 shared by the HSY and X. The 8.5 Mb HSY corresponds to 4.5 Mb of its X counterpart, showing 4 Mb (89% DNA sequence expansion. Conclusion The 89% increase of DNA sequence in HSY indicates rapid expansion of the Yh chromosome after genetic recombination was suppressed 2–3 million years ago. The

  4. 46 CFR 164.006-3 - Construction, materials, and workmanship.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction, materials, and workmanship. 164.006-3..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Deck Coverings for Merchant Vessels § 164.006-3 Construction, materials, and workmanship. (a) It is the intent of this specification to obtain a...

  5. New Zealand's Clyde power station

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, J W; Black, J C; Foster, P F

    1987-12-01

    A 100 m-high mass concrete gravity dam, for the generation of 432 MW of power, is under construction at Clyde on the Clutha River in the South Island of New Zealand. A feature of the dam is the provision of a slip joint to allow up to 2 m of movement on the plane of a fault passing through the dam foundation. Details of the dam foundations, seismic design, river channel fault and slip joint, mass concrete, spillway and sluice, powerhouse, and landslide hazard at the site are given. 3 refs.

  6. Radiological and toxicological calculations for AY-102 and C-106HEPA filters and pre-filters

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, T.R.; Van Vleet, R.J.

    1997-07-01

    The high heat content solids in Tank 241-C-106 are to be removed and transferred to Tank 241-AY-102 by sluicing operations, to be authorized under project W-320. Once sluicing operations are underway, the state of these tanks will be transformed from `unagitated` to `agitated`. This means that the partition fraction which described the aerosol content of the head space will increase from 1 X 10{sup - 20} to 1 X 10{sup -1}. This head space will become much more loaded with suspended material. The nature of this suspended material may change significantly, sluicing may inadvertently bring up radioactive solids which normally would lay under many meters of liquid supernate. It is an enabling assumption that the headspace and filter aerosols in Tank 241-AY-102 are a 90/10 liquid/solid split; there is an unmitigated and mitigated composition. It is an enabling assumption that the sluicing line; the headspace in Tank 241-C-106, and the filters in Tank 241-C-106 contain aerosols which are a 67/33 liquid/solid split; there is an unmitigated and mitigated composition.

  7. Sludge mobilization with submerged nozzles in horizontal cylindrical tanks

    International Nuclear Information System (INIS)

    Hylton, T.D.; Cummins, R.L.; Youngblood, E.L.; Perona, J.J.

    1995-10-01

    The Melton Valley Storage Tanks (MVSTs) and the evaporator service tanks at the Oak Ridge National Laboratory (ORNL) are used for the collection and storage of liquid low-level waste (LLLW). Wastes collected in these tanks are typically acidic when generated and are neutralized with sodium hydroxide to protect the tanks from corrosion; however, the high pH of the solution causes the formation of insoluble compounds that precipitate. These precipitates formed a sludge layer approximately 0.6 to 1.2 m (2 to 4 ft) deep in the bottom of the tanks. The sludge in the MVSTs and the evaporator service tanks will eventually need to be removed from the tanks and treated for final disposal or transferred to another storage facility. The primary options for removing the sludge include single-point sluicing, use of a floating pump, robotic sluicing, and submerged-nozzle sluicing. The objectives of this study were to (1) evaluate the feasibility of submerged-nozzle sluicing in horizontal cylindrical tanks and (2) obtain experimental data to validate the TEMPEST (time-dependent, energy, momentun, pressure, equation solution in three dimensions) computer code

  8. Construction, specification, and mathematical description of aspheric surfaces.

    Science.gov (United States)

    Smith, G; Atchison, D A

    1983-03-01

    Rotationally symmetrical aspheric surfaces of spectacle lenses are constructed as either "zonal aspherics" or "continuous aspherics." Zonal aspherics consist of annular zones surrounding a central zone with each zone being nominally spherical with progressively lower surface power the farther the zone is from the surface vertex. Aspheric surfaces are often specified by the radial drop in surface power from the center to the edge of the lens (e.g., Welsh Four-drop), but for assessment purposes the surface shape must be specified more precisely. The formulas for the description of continuous aspherics can be manipulated into different forms. Mathematical descriptions are given or developed which will enable theoretical assessment of the performances of all lenses with rotationally symmetrical aspheric surfaces.

  9. Free-standing and porous hierarchical nanoarchitectures constructed with cobalt cobaltite nanowalls for supercapacitors with high specific capacitances

    Science.gov (United States)

    Xiao, Yuanhua; Zhang, Aiqin; Liu, Shaojun; Zhao, Jihong; Fang, Shaoming; Jia, Dianzeng; Li, Feng

    2012-12-01

    Free-standing and porous hierarchical nanoarchitectures constructed with cobalt cobaltite (Co3O4) nanowalls have been successfully synthesized in large scale by calcining three dimensional (3D) hierarchical nanostructures consisting of single crystalline cobalt carbonate hydroxide hydrate - Co(CO3)0.5(OH)·0.11H2O nanowalls prepared with a solvothermal method. The step-by-step decomposition of the precursor can generate porous Co3O4 nanowalls with BET surface area of 88.34 m2 g-1. The as-prepared Co3O4 nanoarchitectures show superior specific capacitance to the most Co3O4 supercapacitor electrode materials to date. After continuously cycled for 1000 times of charge-discharge at 4 A g-1, the supercapacitors can retain ca 92.3% of their original specific capacitances. The excellent performances of the devices can be attributed to the porous and hierarchical 3D nanostructure of the materials.

  10. Economic assessment of the construction industry: A construction-economics nexus

    Science.gov (United States)

    Barber, Herbert Marion, Jr.

    The purpose of this study was to conduct an economic assessment of the construction industry. More specifically, this study addresses ambiguities within the literature that are associated with the construction-economics nexus. The researcher 1) investigated the relationships between economic indicators and stock prices of U.S. construction equipment manufacturers, 2) investigated the relationships between energy production, consumption, and corruption, and 3) determined the economic effect electricity generation and electricity consumption has on economies of scale. The researcher used descriptive and inferential statistics in this study and determined that economists, researchers, policy-makers, and others should have predicted the 2007-08 world economic collapse 5-6 years prior to realization of the event given that construction indices and GDP grossly regressed from statistically acceptable trends as early as 2002 and perhaps 2000. Substantiating this claim, the effect of the cost of construction materials and labor, i.e. construction index, on GDP was significant for years leading up to the collapse (1970-2007). Additionally, it was determined that energy production and consumption are predictors of governmental corruption in some countries. In the Republic of Botswana, for example, the researcher determined that energy production and consumption statistically jointly effected governmental corruption. In addition to determining statistical effect, a model for predicting governmental corruption was developed based on energy production and consumption volumes. Also, the researcher found that electricity generation in the 25 largest world economies had a statistically significant effect on GDP. Electricity consumption also had an effect on GDP, as well, but not on other economic indicators. More importantly than the quantitative findings, the researcher concluded that the construction-economics nexus is far more complex than most policy-makers realize. As such

  11. Acceptance test report for the Tank 241-C-106 in-tank imaging system

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1998-01-01

    This document presents the results of Acceptance Testing of the 241-C-106 in-tank video camera imaging system. The purpose of this imaging system is to monitor the Project W-320 sluicing of Tank 241-C-106. The objective of acceptance testing of the 241-C-106 video camera system was to verify that all equipment and components function in accordance with procurement specification requirements and original equipment manufacturer's (OEM) specifications. This document reports the results of the testing

  12. GAAT dry well conductivity monitoring report, July 1997 through January 1998, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    A waste removal program is being implemented for the Gunite and Associated Tanks (GAAT) Operable Unit at Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. The waste is being removed by means of remotely operated, in-tank, confined sluicing equipment. The waste removal operations in Tanks W-3 and W-4 in the North Tank Farm (NTF) have been completed and the equipment is being moved to the South Tank Farm (STF), where it will be used to remove the sludges from the six STF tanks (W-5, W-6, W-7, W-8, W-9, and W-10) beginning later this year. During sluicing operations the dry wells adjacent to each of the tanks are instrumented so that potential releases can be detected by means external to the tank. The method of detection is by monitoring the electrical conductivity of the water in the dry well associated with each tank. This report documents the dry well conductivity monitoring data for the period from July 1997 through January 1998. The dry wells monitored during this period include DW-3, DW-4, DW-8, DW-9, and DW-10. The conductivity of the water passing through Pump Station 1 (PS 1) was also monitored. The principal activities that occurred during this period were the sluicing of Tanks W-3 and W-4 in the NTF, transfer of tank liquids from the NTF to the STF, and the installation of new risers, tank dome leveling, and emplacement of stabilized base backfill in the STF. Presented in this report are the dry well conductivity, rainfall, tank level, and STF construction information that is relevant to the analysis and interpretation of the monitoring data for the reporting period. A thorough analysis of the monitoring results for the period indicates that no releases have occurred from the gunite tanks being monitored

  13. Specification, construction, and exact reduction of state transition system models of biochemical processes.

    Science.gov (United States)

    Bugenhagen, Scott M; Beard, Daniel A

    2012-10-21

    Biochemical reaction systems may be viewed as discrete event processes characterized by a number of states and state transitions. These systems may be modeled as state transition systems with transitions representing individual reaction events. Since they often involve a large number of interactions, it can be difficult to construct such a model for a system, and since the resulting state-level model can involve a huge number of states, model analysis can be difficult or impossible. Here, we describe methods for the high-level specification of a system using hypergraphs, for the automated generation of a state-level model from a high-level model, and for the exact reduction of a state-level model using information from the high-level model. Exact reduction is achieved through the automated application to the high-level model of the symmetry reduction technique and reduction by decomposition by independent subsystems, allowing potentially significant reductions without the need to generate a full model. The application of the method to biochemical reaction systems is illustrated by models describing a hypothetical ion-channel at several levels of complexity. The method allows for the reduction of the otherwise intractable example models to a manageable size.

  14. Chemical compatibility of tank wastes in 241-C-106, 241-AY-101, and 241-AY-102

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1994-01-01

    This report documents the chemical compatibility of waste types within tanks 241-C-106, 241-AY-101, and 241-AY-102. This information was compiled to facilitate the transfer of tank C-106 waste to tank AY-102 utilizing supernatant from AY-101 as the sluicing medium. This document justifies that no chemical compatibility safety issues currently understood, or theorized from thermodynamic modeling, will result from the intended sluice transfer operation

  15. Percutaneous, radiology-assisted stent implantation by means of a novel prosthesis of the bile duct in cases of inoperable cholangioma. Perkutane radiologische Stentimplantation beim inoperablen Gallengangskarzinom mittels einer neuen Gallengangsprothese

    Energy Technology Data Exchange (ETDEWEB)

    Beck, A; Nanko, N [Freiburg Univ. (Germany, F.R.). Abt. Roentgendiagnostik; Milic, S [Consiglio Nazionale delle Ricerche, Rome (Italy); Volk, B [Freiburg Univ. (Germany, F.R.). Abt. Innere Medizin 1 (Haematologie und Onkologie)

    1989-07-01

    In case of malignant growth causing biliary obstruction, biliary decompression can be achieved by surgery, or by means of external/internal drainage. A novel stent with an F7 outer diameter can be percutaneously introduced and positioned through an F8 sluice, assisted by radiologic and cholangioscopic control, and can be dilated to the required diameter by means of a balloon catheter. The implentation can entirely be done through the sluice.

  16. Management of waste from packaging of construction materials in building construction works

    OpenAIRE

    González Pericot, Natalia; Río Merino, Mercedes del

    2011-01-01

    Every material arriving at the construction site comes protected in some type of packaging, fundamentally cardboard, plastic or wood, and presently the great majority of these packagings finish in a container mixed with the rest of waste of the construction work. The increasing tendency to use prefabricated materials increases the volume of packaging necessary in product transport; in addition, the traditional materials also arrive more protected with packaging. A specific management for ...

  17. Sustainable material selection for construction industry

    DEFF Research Database (Denmark)

    Govindan, Kannan; Shankar, Madan; Kannan, Devika

    2016-01-01

    a hybrid multi criteria decision making (MCDM) methodology with a specific examination of the UAE. The indicators collected from existing literatures were used in evaluation of sustainable construction materials with the assistance of construction sector-based respondents. The proposed framework...

  18. NIF conventional facilities construction health and safety plan

    International Nuclear Information System (INIS)

    Benjamin, D W

    1998-01-01

    The purpose of this Plan is to outline the minimum health and safety requirements to which all participating Lawrence Livermore National Laboratory (LLNL) and non-LLNL employees (excluding National Ignition Facility [NIF] specific contractors and subcontractors covered under the construction subcontract packages (e.g., CSP-9)-see Construction Safety Program for the National Ignition Facility [CSP] Section I.B. ''NIF Construction Contractors and Subcontractors'' for specifics) shall adhere to for preventing job-related injuries and illnesses during Conventional Facilities construction activities at the NIF Project. For the purpose of this Plan, the term ''LLNL and non-LLNL employees'' includes LLNL employees, LLNL Plant Operations staff and their contractors, supplemental labor, contract labor, labor-only contractors, vendors, DOE representatives, personnel matrixed/assigned from other National Laboratories, participating guests, and others such as visitors, students, consultants etc., performing on-site work or services in support of the NIF Project. Based upon an activity level determination explained in Section 1.2.18, in this document, these organizations or individuals may be required by site management to prepare their own NIF site-specific safety plan. LLNL employees will normally not be expected to prepare a site-specific safety plan. This Plan also outlines job-specific exposures and construction site safety activities with which LLNL and non-LLNL employees shall comply

  19. Reuse Tools to Support ADA Instantiation Construction

    Science.gov (United States)

    1990-06-01

    specification and body with embedded task shell instantiations, as well as an inter-task coordination procedure which controls task activation, execution, and...Tools to Support Ada Instantiation Construction 3 - Generalized Construction Approaches Page 39 4Automatic Programming Programmer’s Apprentice ~ASLs...which is the root of a frame hierarchy. The specification frame controls the hierarchy’s composition of the program and stores all its custom

  20. Construction of permanently inducible miRNA-based expression vectors using site-specific recombinases

    Directory of Open Access Journals (Sweden)

    Garwick-Coppens Sara E

    2011-11-01

    Full Text Available Abstract Background RNA interference (RNAi is a conserved gene silencing mechanism mediated by small inhibitory microRNAs (miRNAs. Promoter-driven miRNA expression vectors have emerged as important tools for delivering natural or artificially designed miRNAs to eukaryotic cells and organisms. Such systems can be used to query the normal or pathogenic functions of natural miRNAs or messenger RNAs, or to therapeutically silence disease genes. Results As with any molecular cloning procedure, building miRNA-based expression constructs requires a time investment and some molecular biology skills. To improve efficiency and accelerate the construction process, we developed a method to rapidly generate miRNA expression vectors using recombinases instead of more traditional cut-and-paste molecular cloning techniques. In addition to streamlining the construction process, our cloning strategy provides vectors with added versatility. In our system, miRNAs can be constitutively expressed from the U6 promoter, or inducibly expressed by Cre recombinase. We also engineered a built-in mechanism to destroy the vector with Flp recombinase, if desired. Finally, to further simplify the construction process, we developed a software package that automates the prediction and design of optimal miRNA sequences using our system. Conclusions We designed and tested a modular system to rapidly clone miRNA expression cassettes. Our strategy reduces the hands-on time required to successfully generate effective constructs, and can be implemented in labs with minimal molecular cloning expertise. This versatile system provides options that permit constitutive or inducible miRNA expression, depending upon the needs of the end user. As such, it has utility for basic or translational applications.

  1. Construction quality assurance report for the Y-12 Construction/Demolition Landfill VII (CDL VII), Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burton, P.M.

    1994-11-01

    This Construction Quality Assurance (CQA) Report provides documentation that Bid Option 2 of the Y-12 Plant Construction Demolition Landfill 7 (CDL-7) was constructed in substantial compliance with the Tennessee Department of Environment and Conservation (TDEC) approved design, as indicated and specified in the permit drawings, approved changes, and specifications. CDL-7 is located in Anderson County on the south side of Chestnut Ridge, approximately 0.5 miles south of the Y-12 Plant in Oak Ridge, Tennessee. This report applies specifically to the limits of excavation for Area No. 1 portions of the perimeter maintenance road and drainage channel and Sedimentation Pond No. 3. A partial ''As-Built'' survey was performed and is included

  2. Project management plan for Waste Area Grouping 5 Old Hydrofracture Facility tanks contents removal at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-02-01

    This revision (Rev. 1) updates the schedule and designation of responsibilities for the Old Hydrofracture Facility (OHF) tanks contents removal project. Ongoing and planned future activities include: cold testing of the sluicing and pumping system; readiness assessment; equipment relocation and assembly; isotopic dilution of fissile radionuclides; sluicing and transfer of the tanks contents; and preparation of the Removal Action Completion Report. The most significant change is that the sluicing and pumping system has been configured by and will be operated by CDM Federal Programs Corporation. In addition, a new technical lead and a new project analyst have been designated within Lockheed Martin Energy Systems, Inc. and Lockheed Martin Energy Research Corp. The schedule for tanks contents removal has been accelerated, with transfer of the final batch of tank slurry now scheduled for March 31, 1998 (instead of November 10, 1998). The OHF sluicing and pumping project is proceeding as a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act. The purpose of the project is to remove the contents from five inactive underground storage tanks, designated T-1, T-2, T-3, T-4, and T-9. The tanks contain an estimated 52,700 gal of liquid and sludge, together comprising a radioactive inventory of approximately 30,000 Ci

  3. ConStruct: Improved construction of RNA consensus structures

    Directory of Open Access Journals (Sweden)

    Steger Gerhard

    2008-04-01

    Full Text Available Abstract Background Aligning homologous non-coding RNAs (ncRNAs correctly in terms of sequence and structure is an unresolved problem, due to both mathematical complexity and imperfect scoring functions. High quality alignments, however, are a prerequisite for most consensus structure prediction approaches, homology searches, and tools for phylogeny inference. Automatically created ncRNA alignments often need manual corrections, yet this manual refinement is tedious and error-prone. Results We present an extended version of CONSTRUCT, a semi-automatic, graphical tool suitable for creating RNA alignments correct in terms of both consensus sequence and consensus structure. To this purpose CONSTRUCT combines sequence alignment, thermodynamic data and various measures of covariation. One important feature is that the user is guided during the alignment correction step by a consensus dotplot, which displays all thermodynamically optimal base pairs and the corresponding covariation. Once the initial alignment is corrected, optimal and suboptimal secondary structures as well as tertiary interaction can be predicted. We demonstrate CONSTRUCT's ability to guide the user in correcting an initial alignment, and show an example for optimal secondary consensus structure prediction on very hard to align SECIS elements. Moreover we use CONSTRUCT to predict tertiary interactions from sequences of the internal ribosome entry site of CrP-like viruses. In addition we show that alignments specifically designed for benchmarking can be easily be optimized using CONSTRUCT, although they share very little sequence identity. Conclusion CONSTRUCT's graphical interface allows for an easy alignment correction based on and guided by predicted and known structural constraints. It combines several algorithms for prediction of secondary consensus structure and even tertiary interactions. The CONSTRUCT package can be downloaded from the URL listed in the Availability and

  4. Chemical compatibility of tank wastes in tanks 241-C-106, 241-AY-101, and 241-AY-102

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1994-01-01

    This report documents the chemical compatibility of waste types within tanks 241-C-106, 241-AY-101, and 241-AY-102. This information was compiled to facilitate the transfer of tank 241-C-106 waste to tank 241-AY-102 utilizing supernatant from tank 241-AY-101 as the sluicing medium. This document justifies that no chemical compatibility safety issues currently understood, or theorized from thermodynamic modeling, will result from the intended sluice transfer operation

  5. Nonradioactive Air Emissions Notice of Construction use of a portable exhauster on 241-A-101 tank during salt well pumping and other routine activities

    International Nuclear Information System (INIS)

    Hays, C.B.

    1996-01-01

    The 241-A-101 tank, a 22.9 meter 3,785,400 liter capacity SST, was constructed from the fourth generation of tank designs, which were capable of holding boiling or self-concentrating waste. Construction features a reinforced concrete shell, dome, and base with a mild steel liner covering the bottom and sidewalls. The tank has a flat bottom with a usable waste depth of approximately 9.4 meters. The tank was put into service in 1956 to store plutonium-uranium extraction (PUREX) high-level waste and organic wash waste. The waste was allowed to self-concentrate up until 1968. Tank sluicing was performed in 1969 and again in 1976 to reduce the amount of strontium and cesium, the two isotopes found to be the main heat generating sources in the tank. In 1978, the tank was reassigned for saltcake storage. The tank was taken out of service in November 1980 and partially isolated in 1982. Salt well pumping is a method used to interim stabilize SSTS. Interim stabilization is commenced once all the liquid above the solids has been removed (primary stabilization). Interim stabilization removes the gravity drainable liquid and the interstitial liquid between the solids from the SST and transfers the liquid to a double-shell tank (DST) or to a staging double-contained receiver tank (DCRT), which is subsequently transferred to a DST. Pumping is accomplished at very low flow rates, 15.1 liters per minute or less. Normally, salt well pumping is performed without the need of an exhauster. However, recent safety evaluations concluded that a minimum exhaust flow rate of 7.1 cubic meters per minute would be required to enhance the safety of the tank. Therefore, active ventilation will be part of this process for the 241-A-101 tank. This document details the Nonradioactive Air Emissions Notice of Construction for the use of a portable exhauster on Tank 241-A-101 during salt well pumping and other routine activities

  6. The four roles of supply chain management in construction

    NARCIS (Netherlands)

    Vrijhoef, R.; Koskela, L.

    2000-01-01

    It is argued that due to construction peculiarities, supply chain management has four specific roles in construction. Practical initiatives in each role to advance the construction supply chain are analysed. The present status of construction supply chains is investigated by means of case studies

  7. Discrimination of candidate subgenome-specific loci by linkage map construction with an S1 population of octoploid strawberry (Fragaria × ananassa).

    Science.gov (United States)

    Nagano, Soichiro; Shirasawa, Kenta; Hirakawa, Hideki; Maeda, Fumi; Ishikawa, Masami; Isobe, Sachiko N

    2017-05-12

    The strawberry, Fragaria × ananassa, is an allo-octoploid (2n = 8x = 56) and outcrossing species. Although it is the most widely consumed berry crop in the world, its complex genome structure has hindered its genetic and genomic analysis, and thus discrimination of subgenome-specific loci among the homoeologous chromosomes is needed. In the present study, we identified candidate subgenome-specific single nucleotide polymorphism (SNP) and simple sequence repeat (SSR) loci, and constructed a linkage map using an S 1 mapping population of the cultivar 'Reikou' with an IStraw90 Axiom® SNP array and previously published SSR markers. The 'Reikou' linkage map consisted of 11,574 loci (11,002 SNPs and 572 SSR loci) spanning 2816.5 cM of 31 linkage groups. The 11,574 loci were located on 4738 unique positions (bin) on the linkage map. Of the mapped loci, 8999 (8588 SNPs and 411 SSR loci) showed a 1:2:1 segregation ratio of AA:AB:BB allele, which suggested the possibility of deriving loci from candidate subgenome-specific sequences. In addition, 2575 loci (2414 SNPs and 161 SSR loci) showed a 3:1 segregation of AB:BB allele, indicating they were derived from homoeologous genomic sequences. Comparative analysis of the homoeologous linkage groups revealed differences in genome structure among the subgenomes. Our results suggest that candidate subgenome-specific loci are randomly located across the genomes, and that there are small- to large-scale structural variations among the subgenomes. The mapped SNPs and SSR loci on the linkage map are expected to be seed points for the construction of pseudomolecules in the octoploid strawberry.

  8. Constructing criticality by classification

    DEFF Research Database (Denmark)

    Machacek, Erika

    2017-01-01

    " in the bureaucratic practice of classification: Experts construct material criticality in assessments as they allot information on the materials to the parameters of the assessment framework. In so doing, they ascribe a new set of connotations to the materials, namely supply risk, and their importance to clean energy......, legitimizing a criticality discourse.Specifically, the paper introduces a typology delineating the inferences made by the experts from their produced recommendations in the classification of rare earth element criticality. The paper argues that the classification is a specific process of constructing risk....... It proposes that the expert bureaucratic practice of classification legitimizes (i) the valorisation that was made in the drafting of the assessment framework for the classification, and (ii) political operationalization when enacted that might have (non-)distributive implications for the allocation of public...

  9. 49 CFR 231.18 - Cars of special construction.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Cars of special construction. 231.18 Section 231... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD SAFETY APPLIANCE STANDARDS § 231.18 Cars of special construction. Cars of construction not covered specifically in the foregoing sections in this part, relative to...

  10. Contingency planning and emergency response in construction activities: Training the construction worker

    International Nuclear Information System (INIS)

    Jones, E.

    1987-01-01

    Construction activities have the potential for environmental and/or health impacts at Oak Ridge National Laboratory (ORNL) particularly as site cleanup and restoration plans are initiated. ORNL has instituted special training for all construction workers and related contractors. Individuals learn how construction activities at ORNL can potentially have adverse effects on the environment and their health, and to learn how to respond to potential chemical and radiation hazards. Workers are given a review of basic information on radiation and chemicals in a framework that emphasizes the situations in which workers or the environment may be exposed to potential risk. Specific instructions are presented on what to do when contamination is suspected, with identification of emergency procedures and response personnel. 5 refs., 1 fig

  11. Real-time specifications

    DEFF Research Database (Denmark)

    David, A.; Larsen, K.G.; Legay, A.

    2015-01-01

    A specification theory combines notions of specifications and implementations with a satisfaction relation, a refinement relation, and a set of operators supporting stepwise design. We develop a specification framework for real-time systems using Timed I/O Automata as the specification formalism......, with the semantics expressed in terms of Timed I/O Transition Systems. We provide constructs for refinement, consistency checking, logical and structural composition, and quotient of specifications-all indispensable ingredients of a compositional design methodology. The theory is implemented in the new tool Ecdar...

  12. Construction of the Chamagawa bridge; Chamagawabashi no seko

    Energy Technology Data Exchange (ETDEWEB)

    Kawado, A.; Okawa, M. [Honshu-Shikoku Bridge Authority, Tokyo (Japan); Yoshii, M.; Oda, I.

    1997-09-30

    The Chamagawa Bridge is a reinforced concrete fixed-arch bridge which is located at the northern end of Awaji Island, 1.5 km away from the Honshu-Shikoku linking large-scale Akashi Strait Bridge. This paper describes the design and construction of the bridge. Overhang construction method using cable stayed members was adopted. Against the tensile stress generated in the arch-ring under construction, reaction force was burdened with cable stayed columns, anchor blocks and ground anchors by regulating stress using cable stayed members and by resisting using PC steel rods arranging in the arch-ring. For the construction of arch-ring, a space was made for fabricating a specific large-scale movable working vehicle by the grounding support. Then, overhang construction was started. For the construction of overhang, construction of cable stayed members, regulation of stress, and tension of ground anchors were conducted with the construction of each block. The construction of linking block in the center was conducted by hanging support method after the specific large-scale movable working vehicle was taken to pieces. After the connection of arch-ring, tensile forces of cable stayed members and ground anchors were released. The bridge was completed in the down road in 1997. 1 ref., 21 figs., 6 tabs.

  13. The construction of a library of synthetic promoters revealed some specific features of strong Streptomyces promoters

    DEFF Research Database (Denmark)

    Seghezzi, Nicolas; Amar, Patrick; Købmann, Brian

    2011-01-01

    Streptomyces are bacteria of industrial interest whose genome contains more than 73% of bases GC. In order to define, in these GC-rich bacteria, specific sequence features of strong promoters, a library of synthetic promoters of various sequence composition was constructed in Streptomyces. To do so...... cloned into the promoter-probe plasmid pIJ487 just upstream of the promoter-less aphII gene that confers resistance to neomycin. This synthetic promoter library was transformed into Streptomyces lividans, and the resulting transformants were screened for their ability to grow in the presence of different...... projects. Thirty-eight promoters were sequenced, and the sequences of the 14 weakest and 14 strongest promoters were compared using the WebLogo software with small sample correction. This comparison revealed that the −10 box, the −10 extended motif as well as the spacer of the strong Streptomyces promoters...

  14. Construction and expression of a functional monoclonal antibody SZ-51 specific for GMP-140 chimeric fab fragment in Escherichia coli

    International Nuclear Information System (INIS)

    Gu Jianming; Zhang Xiaomin; Xia Lijun; Wan Haiying; Liu Yue; Li Peixia; Ruan Changgeng

    1996-04-01

    The variable region cDNAs of a monoclonal antibody SZ-51 specific for α-granule membrane protein (GMP-140) on the surface of activated human platelets were spliced with the constant region cDNA of the heavy chain CH1 and light chain k of human Ig G by means of the gene recombination techniques. The above recombinant gene was amplified by the polymerase chain reaction (PCR). The expression vector of phage plasmid pHEN1 SZ-51 Fab/Hu was constructed. The pHEN1-51 Fab/Hu was introduced into non-suppressor E. coli HB2151. The amount of expression of SZ-51 chimeric Fab/Hu measured by quantitative ELISA was about 500 μg/L. Western blot demonstrated that the SZ-51 chimeric Fab fragment could specifically bind to GMP-140. (2 figs.)

  15. Hanford Tanks Initiative fiscal year 1997 retrieval technology demonstrations

    International Nuclear Information System (INIS)

    Berglin, E.J.

    1998-01-01

    The Hanford Tanks Initiative was established in 1996 to address a range of retrieval and closure issues associated with radioactive and hazardous waste stored in Hanford's single shell tanks (SSTs). One of HTI's retrieval goals is to ''Successfully demonstrate technology(s) that provide expanded capabilities beyond past practice sluicing and are extensible to retrieve waste from other SSTS.'' Specifically, HTI is to address ''Alternative technologies to past practice sluicing'' ... that can ... ''successfully remove the hard heel from a sluiced tank or to remove waste from a leaking SST'' (HTI Mission Analysis). During fiscal year 1997, the project contracted with seven commercial vendor teams to demonstrate retrieval technologies using waste simulants. These tests were conducted in two series: three integrated tests (IT) were completed in January 1997, and four more comprehensive Alternative Technology Retrieval Demonstrations (ARTD) were completed in July 1997. The goal of this testing was to address issues to minimize the risk, uncertainties, and ultimately the overall cost of removing waste from the SSTS. Retrieval technologies can be separated into three tracks based on how the tools would be deployed in the tank: globally (e.g., sluicing) or using vehicles or robotic manipulators. Accordingly, the HTI tests included an advanced sluicer (Track 1: global systems), two different vehicles (Track 2: vehicle based systems), and three unique manipulators (Track 3: arm-based systems), each deploying a wide range of dislodging tools and conveyance systems. Each industry team produced a system description as envisioned for actual retrieval and a list of issues that could prevent using the described system; defined the tests to resolve the issues; performed the test; and reported the results, lessons learned, and state of issue resolution. These test reports are cited in this document, listed in the reference section, and summarized in the appendices. This report

  16. Hanford Tanks Initiative fiscal year 1997 retrieval technology demonstrations

    Energy Technology Data Exchange (ETDEWEB)

    Berglin, E.J.

    1998-02-05

    The Hanford Tanks Initiative was established in 1996 to address a range of retrieval and closure issues associated with radioactive and hazardous waste stored in Hanford`s single shell tanks (SSTs). One of HTI`s retrieval goals is to ``Successfully demonstrate technology(s) that provide expanded capabilities beyond past practice sluicing and are extensible to retrieve waste from other SSTS.`` Specifically, HTI is to address ``Alternative technologies to past practice sluicing`` ... that can ... ``successfully remove the hard heel from a sluiced tank or to remove waste from a leaking SST`` (HTI Mission Analysis). During fiscal year 1997, the project contracted with seven commercial vendor teams to demonstrate retrieval technologies using waste simulants. These tests were conducted in two series: three integrated tests (IT) were completed in January 1997, and four more comprehensive Alternative Technology Retrieval Demonstrations (ARTD) were completed in July 1997. The goal of this testing was to address issues to minimize the risk, uncertainties, and ultimately the overall cost of removing waste from the SSTS. Retrieval technologies can be separated into three tracks based on how the tools would be deployed in the tank: globally (e.g., sluicing) or using vehicles or robotic manipulators. Accordingly, the HTI tests included an advanced sluicer (Track 1: global systems), two different vehicles (Track 2: vehicle based systems), and three unique manipulators (Track 3: arm-based systems), each deploying a wide range of dislodging tools and conveyance systems. Each industry team produced a system description as envisioned for actual retrieval and a list of issues that could prevent using the described system; defined the tests to resolve the issues; performed the test; and reported the results, lessons learned, and state of issue resolution. These test reports are cited in this document, listed in the reference section, and summarized in the appendices. This report

  17. Reserves of labour content reduction in NPP construction

    International Nuclear Information System (INIS)

    Bekerman, R.E.

    1986-01-01

    Specific labour contents when constructing NPP with RBMK-1000 and WWER-1000 type reactors are presented. Factors affecting labour content of NPP construction are shown. Measures aimed at labour content decrease are suggested

  18. 46 CFR 189.55-5 - Plans and specifications required for new construction.

    Science.gov (United States)

    2010-10-01

    ... crewmembers and scientific personnel. (i) Magazines and magazine vans. (1) All plans relating to the arrangement, construction, ventilation, and fire protection system for magazines and magazine vans. (The plans... liferafts and buoyant apparatus. (h) Accommodations for crewmembers and scientific personnel. Arrangement...

  19. The Construction of Job Families Based on Company Specific PAQ Job Dimensions.

    Science.gov (United States)

    Taylor, L. R.; Colbert, G. A.

    1978-01-01

    Research is presented on the construction of job families based on Position Analysis Questionnaire data. The data were subjected to a component analysis. Results were interpreted as sufficiently encouraging to proceed with analyses of validity generalization within the job families. (Editor/RK)

  20. Climate Change Impact Assessment of Dike Safety and Flood Risk in the Vidaa River System

    DEFF Research Database (Denmark)

    Madsen, H.; Sunyer Pinya, Maria Antonia; Larsen, J.

    2013-01-01

    The impact of climate change on the flood risk and dike safety in the Vidaa River system, a cross-border catchment located in the southern part of Jutland, Denmark and northern Germany, is analysed. The river discharges to the Wadden Sea through a tidal sluice, and extreme water level conditions...... in the river system occur in periods of high sea water levels where the sluice is closed and increased catchment run-off take place. Climate model data from the ENSEMBLES data archive are used to assess the changes in climate variables and the resulting effect on catchment run-off. Extreme catchment run......-off is expected to increase about 8 % in 2050 and 14 % in 2100. The changes in sea water level is assessed considering climate projections of mean sea level rise, isostatic changes, and changes in storm surge statistics. At the Vidaa sluice a mean sea level rise of 0.15–0.39 m in 2050 and 0.41–1.11 m in 2010...

  1. 46 CFR 160.038-3 - Materials, workmanship, and construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, and construction. 160.038-3..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Magazine Chests, Portable, for Merchant Vessels § 160.038-3 Materials, workmanship, and construction. (a) Portable magazine chests shall...

  2. Design Processes and Constructive Ergonomics

    OpenAIRE

    Broberg, Ole

    2015-01-01

    This paper discusses some central issues in the concept of constructive ergonomics. It does so by reflecting on experiences from ergonomics intervention projects carried out in Denmark. Constructive ergonomics has a huge potential as a new way to go for ergonomics research and practice. However, many challenges are to be overcome. They relate among others to education and training of ergonomist, and the cultural and institutional setting of ergonomics in specific countries.

  3. Construction and demolition waste indicators.

    Science.gov (United States)

    Mália, Miguel; de Brito, Jorge; Pinheiro, Manuel Duarte; Bravo, Miguel

    2013-03-01

    The construction industry is one of the biggest and most active sectors of the European Union (EU), consuming more raw materials and energy than any other economic activity. Furthermore, construction waste is the commonest waste produced in the EU. Current EU legislation sets out to implement construction and demolition waste (CDW) prevention and recycling measures. However it lacks tools to accelerate the development of a sector as bound by tradition as the building industry. The main objective of the present study was to determine indicators to estimate the amount of CDW generated on site both globally and by waste stream. CDW generation was estimated for six specific sectors: new residential construction, new non-residential construction, residential demolition, non-residential demolition, residential refurbishment, and non-residential refurbishment. The data needed to develop the indicators was collected through an exhaustive survey of previous international studies. The indicators determined suggest that the average composition of waste generated on site is mostly concrete and ceramic materials. Specifically for new residential and new non-residential construction the production of concrete waste in buildings with a reinforced concrete structure lies between 17.8 and 32.9 kg m(-2) and between 18.3 and 40.1 kg m(-2), respectively. For the residential and non-residential demolition sectors the production of this waste stream in buildings with a reinforced concrete structure varies from 492 to 840 kg m(-2) and from 401 to 768 kg/m(-2), respectively. For the residential and non-residential refurbishment sectors the production of concrete waste in buildings lies between 18.9 and 45.9 kg/m(-2) and between 18.9 and 191.2 kg/m(-2), respectively.

  4. On how to do construction management communications engineering

    Institute of Scientific and Technical Information of China (English)

    Zhang Zhi

    2014-01-01

    In the communication construction projects, improving the efectivenes of project management is an important part of the quality asurance program. The efectivenes of the communication and construction project management is afected by many factors. Therefore, the discusion of communication construction project management efectivenes is good for improving the quality of projects of great significance. This paper analyzes the characteristics and problems of communication construction projects, reflecting the importance of project management; then discused the factors afecting the efectivenes of project management; finaly targeted to improve the communication of construction project management efectivenes propose specific methods to ensure communication quality of construction projects.

  5. 46 CFR 162.017-3 - Materials, construction, and workmanship.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, construction, and workmanship. 162.017-3..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Valves, Pressure-Vacuum Relief, for Tank Vessels § 162.017-3 Materials, construction, and workmanship. (a) The valves shall be of...

  6. Decision-making on reverse logistics in the construction industry

    Directory of Open Access Journals (Sweden)

    Thanwadee Chinda

    2016-02-01

    Full Text Available With the growing competition, many construction organizations attempt to improve their productivity, quality, and efficiency. Construction waste management, by means of reverse logistics, becomes a key issue to improve the productivity, and raise the company’s green image. In this study, four reverse logistics methods-direct reuse, remanufacturing, recycling, and landfill-are considered to manage construction and demolition (C&D waste. Two factors (economic and site-specific with their 15 sub-factors affecting the decisions to implement the reverse logistics are examined. The hierarchy model of reverse logistics decisions, developed through the analytic hierarchy process, reveal the importance of the economic factor over the site-specific factor. It is suggested that the transportation cost, the processing cost, the specific sorting technology, and the limited project time must be first considered before making decisions on reverse logistics plans. The construction company can utilize the developed hierarchy model to decide on the most appropriate reverse logistics plan to achieve the best benefits.

  7. Constructing Catalonia

    Directory of Open Access Journals (Sweden)

    Bill Philips

    2009-07-01

    Full Text Available Catalonia, in common with other nations, has long been concerned with the question of identity and difference. Its problematic relationship with Spain has led to an emphasis on differentiating itself from its larger neighbour (if we are to accept, as most Spaniards do not, that Catalonia is not Spain, a situation complicated by the loss of the Spanish colonies of Cuba and The Philippines in 1898, and the Spanish Civil War and subsequent dictatorship from 1936 to 1976. Beginning in the late nineteenth century, the construction of a Catalan identity followed a similar route to that taken by other European nations such as England, Ireland and, indeed, Spain, including an emphasis on rural values, activities and the countryside, and the conversion of specifically local traditions into national past times. It is only in the last ten years or so that this model of Catalan identity has been recognised for what it is – a model constructed and encouraged for and by specific nationalist political interests. Ironically, Catalonia’s identity abroad has also been constructed and manipulated for political purposes, but from quite a different perspective. Orwell’s /Homage to Catalonia/ (1938 narrates an extremely blinkered version of the Spanish Civil War which has achieved iconic status as a result of cold war politics. Subsequent portrayals of the Spanish Civil War – Valentine Cunningham’s /The Penguin Book of Spanish Civil War Verse/ (ed., Penguin, 1980, or Ken Loach’s 1995 film /Land and Freedom/ base their arguments unquestioningly on /Homage to Catalonia/, perpetuating a view of the nation’s recent history that is both reductive and inaccurate

  8. Developing Sensitivity Indicators for Hydraulic Perturbation

    Directory of Open Access Journals (Sweden)

    M.M. Heidari

    2016-02-01

    Full Text Available Introduction: Determination the hydraulic performance of an irrigation network requires adequate knowledge about the sensitivities of the network structures. Hydraulic sensitivity concept of structures and channel reaches aid network operators in identifying structures with higher sensitivities which will attract more attention both during network operation and maintenance program. Sluice gates are frequently used as regulator and delivery structures in irrigation networks. Usually discharge coefficient of sluice gate is considered constant in the design and operation stage. Investigation of sensitivity of offtakes and cross-regulators has carried out by various researchers and some hydraulic sensitivity indicators have been developed. In the previous researches, these indexes were developed based on constant coefficient of discharge for free flow sluice gates. However, the coefficient of discharge for free flow sluice gates depend on gate opening and the upstream water depth. So, in this research, some hydraulic sensitivity indicators at structure based on variable coefficient of discharge for free flow sluice gates were developed and they were validated by using observed data. Materials and Methods: An experimental setup was constructed to analyses the performance of the some hydraulic sensitivity. The flume was provided with storage reservoir, pumps, electromagnetic flowmeter, entrance tank, feeder canal, delivery canals, offtakes, cross-regulators, collector reservoir, piezometric boards. The flume is 60.5 m long and the depth of that is 0.25 m, of which only a small part close to offtake and Cross-regulators was needed for these tests. Offtakes and Cross-regulators are free-flowing sluice gates type. Offtakes were located at distances 20 m and 42.5 m downstream from the entrance tank, respectively. and, Cross-regulators were located 2 m downstream from each offtakes. The offtakes are 0.21 m and Cross-regulators are 0.29 m wide. The upstream

  9. This construction is too hot to handle

    DEFF Research Database (Denmark)

    Jensen, Kim Ebensgaard

    2014-01-01

    This paper presents a synchronic study of an adjectival construction. More specifically, it discusses the [too ADJ to V]-construction (e.g. Tommy was too full to walk), which expresses a causal relation in which the ADJ-element, drawing on the adjectival property of scalarity, specifies a degree ...

  10. This construction is too hot to handle

    DEFF Research Database (Denmark)

    Jensen, Kim Ebensgaard

    This paper presents a synchronic study of an adjectival construction. More specifically, it discusses the [too ADJ to V]-construction (e.g. Tommy was too full to walk), which expresses a causal relation in which the ADJ-element, drawing on the adjectival property of scalarity, specifies a degree ...

  11. Improving NAVFAC's total quality management of construction drawings with CLIPS

    Science.gov (United States)

    Antelman, Albert

    1991-01-01

    A diagnostic expert system to improve the quality of Naval Facilities Engineering Command (NAVFAC) construction drawings and specification is described. C Language Integrated Production System (CLIPS) and computer aided design layering standards are used in an expert system to check and coordinate construction drawings and specifications to eliminate errors and omissions.

  12. System design description for portable 1,000 CFM exhauster Skids POR-007/Skid E and POR-008/Skid F

    International Nuclear Information System (INIS)

    Nelson, O.D.

    1998-01-01

    The primary purpose of the two 1,000 CFM Exhauster Skids, POR-007-SKID E and POR-008-SKID F, is to provide backup to the waste tank primary ventilation systems for tanks 241-C-106 and 241-AY-102, and the AY-102 annulus in the event of a failure during the sluicing of tank 241-C-106 and subsequent transfer of sluiced waste to 241-AY-102. This redundancy is required since both of the tank ventilation systems have been declared as Safety Class systems

  13. Constructive episodic simulation: dissociable effects of a specificity induction on remembering, imagining, and describing in young and older adults.

    Science.gov (United States)

    Madore, Kevin P; Gaesser, Brendan; Schacter, Daniel L

    2014-05-01

    According to the constructive episodic simulation hypothesis (Schacter & Addis, 2007), both remembered past and imagined future events rely heavily on episodic memory. An alternative hypothesis is that observed similarities between remembering and imagining reflect the influence of broader factors such as descriptive ability, narrative style, or inhibitory control. We attempted to distinguish between these 2 hypotheses by examining the impact of an episodic specificity induction on memory, imagination, and picture description in young and older adults. In Experiment 1, participants received the specificity induction or a control induction prior to the memory, imagination, and description tasks. Older adults provided fewer internal (i.e., episodic) and more external (i.e., semantic) details than young adults across the 3 tasks irrespective of induction. Critically, however, the specificity induction selectively increased internal but not external details for memory and imagination in both age groups compared with the control induction. By contrast, the induction did not affect internal (or external) details for picture description. Experiment 2 replicated these results in young adults using a different control induction. Our findings point to a dissociation between episodic processes involved in memory and imagination and nonepisodic processes involved in picture description. PsycINFO Database Record (c) 2014 APA, all rights reserved.

  14. Drainage filters and constructed wetlands to mitigate site-specific nutrient losses

    DEFF Research Database (Denmark)

    Kjærgaard, Charlotte; Hoffmann, Carl Christian; Iversen, Bo Vangsø

    Despite substantial efforts, the leaching of nutrients from agricultural land is still a serious and costly environmental problem in Denmark and elsewhere. The quality goals of the European Water Framework Directive (WFD) for the aquatic environment require a substantial reduction of diffuse nutr...... drainage. The project studies different approaches of implementing the filter technologies including drainage well or drainage pipe filters as well as surface-flow and sub-surface flow constructed wetlands....

  15. Strategy Guideline: Application of a Construction Quality Process to Existing Home Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Mallay, D.; Del Bianco, M.

    2013-08-01

    The Home Innovation Research Labs developed a construction quality process for new and existing high performance homes (HPH) in which high performance goals are established, specifications to meet those goals are defined, and construction monitoring points are added to the construction schedule so that critical energy efficiency details are systematically reviewed, documented, and tested in a timely manner. This report follows the evolution of the construction quality process from its development for new homes, to its application in the construction of a high performance home with enhanced specifications, and its application in a crawlspace renovation.

  16. Strategy Guideline. Application of a Construction Quality Process to Existing Home Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Mallay, D. [Partnership for Home Innovation, Upper Marlboro, MD (United States); Del Bianco, M. [Partnership for Home Innovation, Upper Marlboro, MD (United States)

    2013-08-01

    The Partnership for Home Innovation developed a construction quality process for new and existing high performance homes (HPH) in which high performance goals are established, specifications to meet those goals are defined, and construction monitoring points are added to the construction schedule so that critical energy efficiency details are systematically reviewed, documented, and tested in a timely manner. This report follows the evolution of the construction quality process from its development for new homes, to its application in the construction of a high performance home with enhanced specifications, and its application in a crawlspace renovation.

  17. Alternative constructive methods for construction and assembly of ducts in flooded areas

    Energy Technology Data Exchange (ETDEWEB)

    Machado, Otto L.M.; Gomes, Antonio E.; Loureiro, Mauro O. [Petroleo do Brasil S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The challenge of constructing the gas pipeline Urucu-Coari-Manaus, which has 662 kilometers of extension, from the Base of Operations Geologist Peter de Moura, in Urucu, to the Isaac Sabba Refinery - REMAN, in the city of Manaus, challenged PETROBRAS to search for innovative solutions in the construction of terrestrial ducts in Brazil. The introduction of these solutions was made necessary in view of, mainly, great difficulties of logistic imposed by the Amazonian forest, place where the enterprise in question was implemented. Of the new used techniques, the air transportation of pipes by cargo helicopters, the assembly of columns on pontoon ferries, opening ditches using excavators placed on 'H' shaped pontoon ferries and welding tie-in joints on a system of floating porches (pontoon ferries), must be emphasized. This work will be dedicated specifically to non-conventional constructive methods employed to overcome the construction difficulties due to the instability of the ground of flooded areas in the Amazonian forest, which during 6 (six) months of the year are total and/or partially submerged. (author)

  18. How specific is specific self-efficacy?

    DEFF Research Database (Denmark)

    Nielsen, Tine; Makransky, Guido; Vang, Maria Louison

    2017-01-01

    academic learning self-efficacy (SAL-SE) and specific academic exam self-efficacy (SAE-SE), each scale being measurement invariant relative to age, Gender, admission method and specific course targeted. Furthermore, significant and relevant differences between the SAL-SE and SAE-SE scores dependent......Self-efficacy is an important and much used construct in psychology and social science studies. The validity of the measurements used is not always sufficiently evaluated. The aim was to evaluate the psychometric properties of the Danish translation of the self-efficacy subscale of The Motivated...... Strategies for Learning Questionnaire (MSLQ-SE) within a higher education context. Rasch measurement models were employed focusing on measurement invariance and dimensionality. Results with one students sample showed the MSLQ-SE to be not one, but two separate unidimensional subscales, measuring specific...

  19. MRI contrast demonstration of antigen-specific targeting with an iron-based ferritin construct

    Energy Technology Data Exchange (ETDEWEB)

    Walsh, Edward G., E-mail: edward_walsh@brown.edu [Brown University, Department of Neuroscience (United States); Mills, David R. [Rhode Island Hospital/Warren Alpert Medical School of Brown University, Division of Hematology and Oncology, Department of Medicine (United States); Lim, Sierin; Sana, Barindra [Nanyang Technological University, Division of Bioengineering (Singapore); Brilliant, Kate E. [Rhode Island Hospital/Warren Alpert Medical School of Brown University, Division of Hematology and Oncology, Department of Medicine (United States); Park, William K. C. [Rhode Island Hospital, Department of Diagnostic Imaging (United States)

    2013-01-15

    A genetically modified ferritin has been examined for its properties as a tumor-selective magnetic resonance imaging (MRI) contrast agent. The engineered ferritin described herein was derived from Archaeoglobus fulgidus (AfFtn-AA), which stores a significantly greater quantity of iron than wild-type ferritins. Relaxivity measurements were taken at 3 Tesla of ferritin particles uniformly distributed in an agarose gel to assess relaxivities r{sub 1} and r{sub 2}. The r{sub 1} and r{sub 2} values of the uniformly distributed modified ferritin were significantly higher (r{sub 1} = 1,290 mM{sup -1} s{sup -1} and r{sub 2} = 5,740 mM{sup -1} s{sup -1}) than values observed for wild-type ferritin (e.g., horse spleen, r{sub 1} = 0.674 mM{sup -1} s{sup -1}, r{sub 2} = 95.54 mM{sup -1} s{sup -1}). The modified iron-enriched ferritin (14.5 nm diameter) was conjugated with a monoclonal antibody (10 nm length) against rat Necl-5, a cell surface glycoprotein overexpressed by many epithelial cancers. In vitro studies showed strong reactivity of the assembled nanoconjugate to transformed Necl-5 positive rat prostate epithelial cells. Furthermore, MRI demonstrated a significant T{sub 2} contrast with negligible T{sub 1} effect when bound to cells. These findings highlight the utility of the modified ferritin construct as a novel MRI contrast agent that can be manipulated to target antigen-specific tissues.

  20. APPLICATION OF SIMPLIFIED TAXATION SYSTEM IN CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    O. S. Golubova

    2011-01-01

    Full Text Available Specificity concerning cost formation of construction work executed by  entities of small business enterprises that use a simplified taxation system has a direct impact on the effectiveness of organization activity. Dozens of business entities applying various taxation systems are involved in the execution of the construction process. For this reason an inclusion of taxes in work cost may have a decisive influence on the selection of a contractor for an object construction.  

  1. Aylmer Dam : past, present and future; Barrage Aylmer : passe, present et futur

    Energy Technology Data Exchange (ETDEWEB)

    Giguere, H; Lehoux, B; Toma, G [Quebec Ministere du Developpement durable, de l' Environnement et des Parcs, Quebec, PQ (Canada). Centre d' Expertise Hydrique

    2006-07-01

    The Aylmer gravity dam was built in 1953 in Weedon in Quebec's Eastern Townships. The water reservoir retained by the Aylmer Dam has a capacity of 201,928,700 cubic metres and many houses and cottages now line its shores. As such, the water level must be kept high during the summer holiday season. The initial purpose of the dam was for log transportation, the regulation of the Saint-Francois River and the production of electricity. The retention structure belongs to the Quebec government and is managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). Underwater inspection of the dam in 1998 showed signs of erosion damage that required repair. Five of the dam's seven sluices were equipped with stop logs while the others had metallic floodgates. The damage was caused by the preferential use of the 2 floodgates over the years. This paper described the 3 phases for modernizing the evacuation devices of this dam. The first phase began in 2003 with the repair of the dam. The second phase involved the construction of a more modern building in 2004, and the third phase involved the replacement of wooden girders with heated metallic sluices in 2005. The modernization of this dam has reduced the time for required for water evacuation operations during all seasons and has eliminated the danger linked to de-icing techniques. 1 ref., 8 figs.

  2. Decoupled scheme based on the Hermite expansion to construct lattice Boltzmann models for the compressible Navier-Stokes equations with arbitrary specific heat ratio.

    Science.gov (United States)

    Hu, Kainan; Zhang, Hongwu; Geng, Shaojuan

    2016-10-01

    A decoupled scheme based on the Hermite expansion to construct lattice Boltzmann models for the compressible Navier-Stokes equations with arbitrary specific heat ratio is proposed. The local equilibrium distribution function including the rotational velocity of particle is decoupled into two parts, i.e., the local equilibrium distribution function of the translational velocity of particle and that of the rotational velocity of particle. From these two local equilibrium functions, two lattice Boltzmann models are derived via the Hermite expansion, namely one is in relation to the translational velocity and the other is connected with the rotational velocity. Accordingly, the distribution function is also decoupled. After this, the evolution equation is decoupled into the evolution equation of the translational velocity and that of the rotational velocity. The two evolution equations evolve separately. The lattice Boltzmann models used in the scheme proposed by this work are constructed via the Hermite expansion, so it is easy to construct new schemes of higher-order accuracy. To validate the proposed scheme, a one-dimensional shock tube simulation is performed. The numerical results agree with the analytical solutions very well.

  3. Communications among elements of a space construction ensemble

    Science.gov (United States)

    Davis, Randal L.; Grasso, Christopher A.

    1989-01-01

    Space construction projects will require careful coordination between managers, designers, manufacturers, operators, astronauts, and robots with large volumes of information of varying resolution, timeliness, and accuracy flowing between the distributed participants over computer communications networks. Within the CSC Operations Branch, we are researching the requirements and options for such communications. Based on our work to date, we feel that communications standards being developed by the International Standards Organization, the CCITT, and other groups can be applied to space construction. We are currently studying in depth how such standards can be used to communicate with robots and automated construction equipment used in a space project. Specifically, we are looking at how the Manufacturing Automation Protocol (MAP) and the Manufacturing Message Specification (MMS), which tie together computers and machines in automated factories, might be applied to space construction projects. Together with our CSC industrial partner Computer Technology Associates, we are developing a MAP/MMS companion standard for space construction and we will produce software to allow the MAP/MMS protocol to be used in our CSC operations testbed.

  4. Use of engineered nanomaterials in the construction industry with specific emphasis on paints and their flows in construction and demolition waste in Switzerland.

    Science.gov (United States)

    Hincapié, Ingrid; Caballero-Guzman, Alejandro; Hiltbrunner, David; Nowack, Bernd

    2015-09-01

    One sector where the use of engineered nanomaterials (ENMs) is supposed to offer novel or improved functionalities is the construction industry. During the renovation or demolition of buildings, ENMs contained in former construction materials will enter recycling systems or become construction waste. Currently, information about ENM flows in these processes is insufficient. The potential for the release of ENMs from this waste into the environment is unknown, as are the environmental impacts. To evaluate whether there is currently any nano-relevant construction and demolition waste (C&DW) originating from buildings, we evaluated the sources and flows of ENMs in C&DW and identified their potential exposure pathways. A survey of business representatives of Swiss companies in this sector found that ENMs are mainly used in paints and cement. The most frequently used ENMs in the Swiss housing construction industry are nano-TiO2, nano-SiO2, nano-ZnO, and nano-Ag. Using a bottom-up, semi-quantitative approach, we estimated the flows of ENMs contained in paints along the product's life cycle from buildings to recycling and landfill. The flows of ENMs are determined by their associated flows of building materials. We estimated an annual amount of ENMs used in paints of 14t of TiO2, 12t of SiO2, 5t of ZnO, and 0.2t of Ag. The majority of ENMs contained in paints in Switzerland enter recycling systems (23t/y), a smaller amount is disposed directly in landfills (7t/y), and a tiny fraction of ENM waste is incinerated (0.01t/y). Our results allow a qualitative determination of the potential release of ENMs into technical or environmental compartments, with the highest potential release expected during recycling. Copyright © 2015 Elsevier Ltd. All rights reserved.

  5. Suggestions on Strengthening Greening Construction of Ecological Residential Areas

    OpenAIRE

    Li, Peng

    2013-01-01

    Greening construction is an important part of the construction of ecological residential areas, but there exist some misunderstandings in greening construction of ecological residential districts at present. Based on the description of functions of green space in ecological residential areas, the summarization of principles of greening design, and the discussion of questions in greening construction of ecological residential districts, some suggestions as well as specific measures for strengt...

  6. Evaluation of riser 14 temperature response

    International Nuclear Information System (INIS)

    OGDEN, D.M.

    1999-01-01

    The initial sluicing activities of Project WRSS resulted in a two month increase in temperatures as measured by the Riser 14 thermocouple tree of tank 241-C-106. While this increase was anticipated, the maximum temperature was higher than expected. An evaluation was performed to determine if adequate subcooling exists in the waste to continue sluicing activities. It was determined that a minimum of 10 F subcooling exists in the waste and that the higher Riser 14 temperatures were the result of higher than assumed waste saturation temperature

  7. Recombinant anti-tenascin antibody constructs

    Energy Technology Data Exchange (ETDEWEB)

    ZALUTSKY, MICHAEL R

    2006-08-29

    The general objective of this research is to combine genetically derived molecular constructs reactive with tenascin, with appropriate radionuclides and labeling methods in order to generate more effective diagnostic and therapeutic reagents for oncologic nuclear medicine. Tenascin, a polymorphic extracellular matrix glycoprotein, is of interest because of its high expression on glioma, melanoma, as well as prostate and breast carcinoma. Recently, we have also documented high levels of tenascin in lymphomas, particularly those of higher grade, making the potential clinical impact of tenascin-specific radiodiagnostics and therapeutics even greater. An essential feature of our work plan is the ability to exploit our extensive clinical experience in order to design second-generation constructs with properties which could improve clinical efficacy. To date, we have treated over 150 brain tumor patients with 131I-labeled murine 81C6, an antibody which binds specifically to the alternatively spliced fibronectin type III repeats CD of the tenascin molecule. During the current grant period, we have made several observations which form the basis for our proposed specific aims. First, tissue distribution and catabolism experiments in animal models have demonstrated enhanced stability for a chimeric construct composed of murine variable regions and human IgG2 constant domains. Furthermore, pharmacokinetic studies in patients with 131I-labeled chimeric 81C6 have shown significantly longer retention in glioma tumor resection cavities compared with its murine parent. Second, we have initiated the first clinical trial of an endoradiotherapeutic labeled with the 7.2-hr -particle emitter 211At. Twelve glioma patients have received 211At-labeled chimeric 81C6 directly into their brain tumor resection cavity, and very encouraging results have been obtained. Now that the feasibility of human studies with 211At, has been demonstrated, the development and evaluation of anti

  8. The Great Hydrometer Construction Contest!

    Science.gov (United States)

    McGinnis, James Randy; Padilla, Michael J.

    1991-01-01

    The relationship between specific gravity, salinity, and density in brine solutions is investigated. Students construct hydrometers to reinforce concepts learned in oceanography. Background information, salt requirements for the unknowns, directions, and reproducible worksheets are included. (KR)

  9. Organization, 'Anchoring' of Knowledge, and Innovative Activity in Construction

    DEFF Research Database (Denmark)

    Drejer, Ina; Vinding, Anker Lund

    2006-01-01

    The construction industry is characterised by the widespread use of project organisation. It has been suggested that the relatively low level of innovative activity in the industry can be explained by the temporary nature of firm boundary-crossing projects. Survey data from the Danish construction...... industry is used to investigate the importance of learning and 'anchoring' of project-specific knowledge at the firm level for participation in innovative activities. The data cover both the overall Danish construction industry and a specific region, North Jutland, which has a relatively high...... specialisation of construction workers. Latent class and regression analyses reveal that firms that make extensive use of partnering, together with internal product and process evaluation and knowledge diffusion (labelled 'knowledge-anchoring mechanisms'), are more likely to participate in innovative activities...

  10. Construction of a multifunctional coating consisting of phospholipids and endothelial progenitor cell-specific peptides on titanium substrates

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Huiqing; Li, Xiaojing [Key Lab. of Advanced Technology for Materials of Education Ministry, School of Materials Science and Engineering, Southwest Jiaotong University, Chengdu 610031 (China); Zhao, Yuancong, E-mail: zhaoyc7320@163.com [Key Lab. of Advanced Technology for Materials of Education Ministry, School of Materials Science and Engineering, Southwest Jiaotong University, Chengdu 610031 (China); Li, Jingan; Chen, Jiang [Key Lab. of Advanced Technology for Materials of Education Ministry, School of Materials Science and Engineering, Southwest Jiaotong University, Chengdu 610031 (China); Yang, Ping, E-mail: yangping8@263.net [Key Lab. of Advanced Technology for Materials of Education Ministry, School of Materials Science and Engineering, Southwest Jiaotong University, Chengdu 610031 (China); Maitz, Manfred F. [Key Lab. of Advanced Technology for Materials of Education Ministry, School of Materials Science and Engineering, Southwest Jiaotong University, Chengdu 610031 (China); Max Bergmann Center of Biomaterials Dresden, Leibniz of Polymer Research Dresden, 01069 Dresden (Germany); Huang, Nan [Key Lab. of Advanced Technology for Materials of Education Ministry, School of Materials Science and Engineering, Southwest Jiaotong University, Chengdu 610031 (China)

    2015-08-30

    Graphical abstract: The phospholipid groups of PMMDP can inhibit platele adhesion, and the EPCs-specific peptide of the PMMDP showed special recognition and capture for EPCs. The catechol groups of PMMDP play a critical role as molecular anchor for balancing the binding between the coating and the substrate. - Highlights: • The uniform coating of PMMDP can be constructed on titanium surface successfully through the catechol groups. • The phospholipid groups of PMMDP can inhibit platele adhesion, fibrinogen denaturation and improve the hydrophilicity of substrate. • The EPCs-specific peptide of the PMMDP showed special recognition and capture for EPCs. - Abstract: A phospholipid/peptide polymer (PMMDP) with phosphorylcholine groups, endothelial progenitor cell (EPC)-specific peptides and catechol groups was anchored onto a titanium (Ti) surface to fabricate a biomimetic multifunctional surface. The PMMDP coating was characterized by X-ray photoelectron spectroscopy (XPS), water contact angle measurements and atomic force microscopy (AFM), respectively. The amount of PMMDP coating on the Ti surface was quantified by using the quartz crystal microbalance with dissipation (QCM-D). Interactions between blood components and the coated and bare Ti substrates were evaluated by platelet adhesion and activation assays and fibrinogen denaturation test using platelet rich plasma (PRP). The results revealed that the PMMDP-modified surface inhibited fibrinogen denaturation and reduced platelet adhesion and activation. EPC cell culture on the PMMDP-modified surface showed increased adhesion and proliferation of EPCs when compared to the cells cultured on untreated Ti surface. The inhibition of fibrinogen denaturation and platelet adhesion and support of EPCs attachment and proliferation indicated that this coating might be beneficial for future applications in blood-contacting implants, such as vascular stents.

  11. ACCELERATING CONSTRUCTION INDUSTRY DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Mohan M. Kumaraswamy

    2006-06-01

    Full Text Available The needs for construction industry development are initially viewed from the broader perspectives of imperatives for infrastructure development and national development. All these are clearly more critical in developing countries. A non-exhaustive set of potential drivers and common barriers to construction industry development is identified from previous research. These suggest the usefulness of consolidating a cluster of recent proposals and exercises aiming at (a construction organization development in terms of an over-arching management support system model, as well as improved information and knowledge management; and (b project team development in the context of relationally integrated teams and supply chains, joint risk management and ‘technology and knowledge exchange’ in joint ventures, as well as longer term public private partnerships. These apparently disparate research thrusts are threaded together into a pattern that may inspire, if not feed, specific research and development (R & D agendas for construction industry development in different countries according to their own priorities, constraints and stages of infrastructure and national development.

  12. Influential Factors Affecting Materials Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Jusoh Zairra Mat

    2017-12-01

    Full Text Available Construction projects are more often than not plagued by poor performances such as delays, cost overrun, low productivity, construction wastes and compromised quality. Amongst the critical contributory factors of poor project performances, is the ineffectiveness of materials management occurring in the construction sites. Indeed, materials management is a very important component for construction projects. However, there are only limited numbers of research available regarding this topic. Thus, this research focuses its study on materials management, specifically in identifying the influential factors that affect materials management in the construction project activities. Literatures from books, journal articles and conference papers related to poor project performances and materials management have been reviewed. Consequently, this study sorted the salient influential factors and categorized them based on their specific group. Out of 47 factors identified, they are classified into 8 groups. They are (1 site condition; (2 planning and handling on site; (3 management; (4 materials; (5 supplier and manufacturer default; (6 transportation; (7 contractual; and (8 governmental interferences. In conclusion, this study contends that by identifying the influential factors affecting materials management, it will help construction players to avoid the occurrence of those factors and will minimize the negative impacts on the overall performance of construction projects. Hence, the handling-over of project will be according to schedule and not delayed by materials mismanagement.

  13. Heavy noun phrase constructions in the Afrikaans novel 'n Ander ...

    African Journals Online (AJOL)

    Heavy noun phrase constructions in the Afrikaans novel 'n Ander Land: a cognitive account of a stylistic feature. Luna Beard. Abstract. This article focusses on one grammatical construction, namely heavy noun phrase (NP) constructions in Afrikaans, and more specifically on those instances encountered in the Afrikaans ...

  14. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  15. Novel recombinant immunotoxin of EGFR specific nanobody fused with cucurmosin, construction and antitumor efficiency in vitro.

    Science.gov (United States)

    Deng, Cuimin; Xiong, Jiani; Gu, Xiaofan; Chen, Xiaoying; Wu, Shuifa; Wang, Zhe; Wang, Duanduan; Tu, Jinjin; Xie, Jieming

    2017-06-13

    Epidermal growth factor receptor (EGFR) overexpression is related to the increased aggressiveness, metastases, and poor prognosis in various cancers. In this study, we successfully constructed a new EGFR nanobody-based immunotoxin rE/CUS containing cucurmosin (CUS), The immunotoxin was expressed by prokaryotic system and we obtained a yield of 5 mg protein per liter expression medium. The percentage of it's binding ability totumor cell lines A549, HepG2, SW116, which highly expressed EGFR was 55.6%, 79.6% and 97.1%, respectively, but SW620 was only 4.45%. rE/CUS has the ability to bind A549, HepG2, SW116 cells specifically, and the antigen binding capability was not affected because of extra part of CUS component. The rE/CUS significantly inhibited the cell viability against EGFR over expression tumor cell lines in a dose-and time-dependent manner. Moreover, rE/CUS also induced apoptosis of HepG2 and A549 mightily. Our results demonstrate that rE/CUS is a potential therapeutic strategy for treating EGFR-positive solid tumors.

  16. The prospects of construction and transport industry

    Science.gov (United States)

    Yaskova, Natalia

    2017-10-01

    The article is focused on a problem of moving the construction industry into the growth and prosperity phase. The method of target orienting developed by the author is aimed at overcoming technological weakness of the construction industry and eliminating disproportions of the capital funds’ structure. Exhaustion of traditional sources of construction industry growth and real property market growth required the research on specific technologies of interphase transformations and their development. It will contribute to implementing the objective laws of the new wave of construction growth, which provides the development of immovable’s structure that is reasonable in terms of strategic priorities of the national economy.

  17. Construction of the Questionnaire on Foreign Language Learning Strategies in Specific Croatian Context.

    Science.gov (United States)

    Božinović, Nikolina; Sindik, Joško

    2017-03-01

    Learning strategies are special thoughts or behaviours that individuals use to understand, learn or retain new information, according to the point of view of O’Malley & Chamot. The other view, promoted by Oxford, believes learning strategies are specific actions taken by the learner to make learning easier, faster, more enjoyable, and more transferrable to new situations of language learning and use. The use of appropriate strategies ensures greater success in language learning. The aim of the research was to establish metric characteristics of the Questionnaire on learning strategies created by the author, in line with the template of the original SILL questionnaire (Strategy Inventory for Language Learning). The research was conducted at the Rochester Institute of Technology Croatia on a sample of 201 participants who learned German, Spanish, French and Italian as a foreign language. The results have shown that one-component latent dimensions which describe the space of foreign language learning strategies according to Oxford’s classification, have metric characteristics which are low, but still satisfactory (reliability and validity). All dimensions of learning strategies appeared not to be adequately defined. Therefore, we excluded compensation strategies and merged social and affective strategies into social-affective strategies into the unique dimension. Overall, this version of Oxford’s original questionnaire, based on Oxford’s theoretical construct, applied on Croatian students, clearly shows that current version of the questionnaire has poor metric characteristics. One of the explanations of the results obtained could be positioned in multicultural context and intercultural dialogue. Namely, particular social, political and economic context in Croatia could shape even foreign language learning strategies.

  18. Constructing "Nerdiness": Characterisation in "The Big Bang Theory"

    Science.gov (United States)

    Bednarek, Monika

    2012-01-01

    This paper analyses the linguistic construction of the televisual character Sheldon--the "main nerd" in the sitcom "The Big Bang Theory" (CBS, 2007-), approaching this construction of character through both computerised and "manual" linguistic analysis. More specifically, a computer analysis of dialogue (using concordances and keyword analysis) in…

  19. KASS v.2.2. scheduling software for construction

    OpenAIRE

    Krzemiński Michał

    2016-01-01

    The paper presents fourth version of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System). KASS software is designed for construction scheduling, specially form flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building pr...

  20. Risk pricing practices in finance, insurance and construction

    OpenAIRE

    Laryea, Samuel

    2008-01-01

    A review of current risk pricing practices in the financial, insurance and construction sectors is conducted through a comprehensive literature review. The purpose was to inform a study on risk and price in the tendering processes of contractors: specifically, how contractors take account of risk when they are calculating their bids for construction work. The reference to mainstream literature was in view of construction management research as a field of application rather than a fundamental ...

  1. Peptide Based Radiopharmaceuticals: Specific Construct Approach

    Energy Technology Data Exchange (ETDEWEB)

    Som, P; Rhodes, B A; Sharma, S S

    1997-10-21

    The objective of this project was to develop receptor based peptides for diagnostic imaging and therapy. A series of peptides related to cell adhesion molecules (CAM) and immune regulation were designed for radiolabeling with 99mTc and evaluated in animal models as potential diagnostic imaging agents for various disease conditions such as thrombus (clot), acute kidney failure, and inflection/inflammation imaging. The peptides for this project were designed by the industrial partner, Palatin Technologies, (formerly Rhomed, Inc.) using various peptide design approaches including a newly developed rational computer assisted drug design (CADD) approach termed MIDAS (Metal ion Induced Distinctive Array of Structures). In this approach, the biological function domain and the 99mTc complexing domain are fused together so that structurally these domains are indistinguishable. This approach allows construction of conformationally rigid metallo-peptide molecules (similar to cyclic peptides) that are metabolically stable in-vivo. All the newly designed peptides were screened in various in vitro receptor binding and functional assays to identify a lead compound. The lead compounds were formulated in a one-step 99mTc labeling kit form which were studied by BNL for detailed in-vivo imaging using various animals models of human disease. Two main peptides usingMIDAS approach evolved and were investigated: RGD peptide for acute renal failure and an immunomodulatory peptide derived from tuftsin (RMT-1) for infection/inflammation imaging. Various RGD based metallopeptides were designed, synthesized and assayed for their efficacy in inhibiting ADP-induced human platelet aggregation. Most of these peptides displayed biological activity in the 1-100 µM range. Based on previous work by others, RGD-I and RGD-II were evaluated in animal models of acute renal failure. These earlier studies showed that after acute ischemic injury the renal cortex displays

  2. 46 CFR 160.062-3 - Materials, construction, workmanship, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, construction, workmanship, and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Releases. Lifesaving Equipment, Hydraulic and Manual § 160.062-3 Materials, construction, workmanship, and performance...

  3. Operational tank leak detection and minimization during retrieval

    International Nuclear Information System (INIS)

    Hertzel, J.S.

    1996-03-01

    This report evaluates the activities associated with the retrieval of wastes from the single-shell tanks proposed under the initial Single-Shell Tank Retrieval System. This report focuses on minimizing leakage during retrieval by using effective leak detection and mitigating actions. After reviewing the historical data available on single-shell leakage, and evaluating current leak detection technology, this report concludes that the only currently available leak detection method which can function within the most probable leakage range is the mass balance system. If utilized after each sluicing campaign, this method should allow detection at a leakage value well below the leakage value where significant health effects occur which is calculated for each tank. Furthermore, this report concludes that the planned sequence or sluicing activities will serve to further minimize the probability and volume of leaks by keeping liquid away from areas with the greatest potential for leaking. Finally, this report identifies a series of operational responses which when used in conjunction with the recommended sluicing sequence and leak detection methods will minimize worker exposure and environmental safety health risks

  4. 46 CFR 160.057-3 - Materials, workmanship, construction, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, construction, and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Floating Orange Smoke Distress Signals (15 Minutes) § 160.057-3 Materials, workmanship, construction, and performance...

  5. 46 CFR 160.037-3 - Materials, workmanship, construction, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, construction, and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand Orange Smoke Distress Signals § 160.037-3 Materials, workmanship, construction, and performance requirements. (a...

  6. 46 CFR 160.031-3 - Materials, construction, workmanship, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, construction, workmanship, and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Line-Throwing Appliance, Shoulder Gun Type (and Equipment) § 160.031-3 Materials, construction, workmanship, and...

  7. 46 CFR 160.036-3 - Materials, workmanship, construction and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, construction and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand-Held Rocket-Propelled Parachute Red Flare Distress Signals § 160.036-3 Materials, workmanship, construction and...

  8. 46 CFR 160.040-3 - Materials, construction, workmanship, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, construction, workmanship, and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Line-Throwing Appliance, Impulse-Projected Rocket Type (and Equipment) § 160.040-3 Materials, construction, workmanship...

  9. 46 CFR 160.024-3 - Materials, workmanship, construction, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, construction, and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Pistol-Projected Parachute Red Flare Distress Signals § 160.024-3 Materials, workmanship, construction, and performance...

  10. 46 CFR 160.058-3 - Materials, workmanship, construction and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, construction and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Desalter Kits, Sea Water, for Merchant Vessels § 160.058-3 Materials, workmanship, construction and performance...

  11. Construction plant requirements for nuclear sites

    International Nuclear Information System (INIS)

    Tatum, C.B.; Harris, J.A.

    1981-01-01

    Planning and developing the temporary construction plant facilities for a nuclear project is equivalent to providing utility services for a small city. Provision of adequate facilities is an important factor in the productivity of both the manual and non-manual work force. This paper summarizes construction facility requirements for a two unit (1300 MWe each) nuclear project. Civil, mechanical and electrical facilities are described, including design, installation and operation. Assignment of responsibility for specific work tasks regarding the construction plant is also discussed. In presenting this data, the authors seek to transfer experience and assist in the provision of adequate facilities on future projects

  12. The construction project manager in South Africa: Analysis of ...

    African Journals Online (AJOL)

    Journal Home > Vol 22, No 1 (2015) > ... Construction project managers in the built environment come from various backgrounds and knowledge bases; therefore, the project managers' project ... Industry-specific guidelines for construction project management (PMBOK and SACPCMP) were obtained and analysed.

  13. Licensing of ANSTO'S OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Ordonez, J.P.

    2006-01-01

    Full text: This paper presents a general description of the ongoing licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) Open Pool Australian Light-water (OPAL) Reactor at their Lucas Heights site. It addresses the following aspects: The Construction Licence - what it is and what impact it had on the construction of the OPAL Reactor, specifically the various Construction Licence Conditions; The interface between ANSTO, INVAP and ARPANSA during the construction of the OPAL Reactor, particularly in relation to ARPANS Regulation 54; Specific licensing issues that have arisen during the construction and commissioning process and how they have been resolved; The Operating Licence Application - what it is and how it interfaces with the construction and commissioning of the OPAL Reactor. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators. Note that this paper is an update of a presentation given at IGORR10 and follows on from a paper previously presented at PNBC12 in October 2002

  14. Relationship between Performance of Quantity Surveying Students in Building Construction and Construction Measurement Courses

    Directory of Open Access Journals (Sweden)

    Olatunde Nathaniel Ayinde

    2018-01-01

    Full Text Available Stakeholders in the educational sector over the century have devoted substantial resources in seeking ways of improving students’ academic performance, yet, the desired improved academic performance has not been achieved. By appraising the relationship between the performance of Quantity Surveying (QS students in Building Construction and Construction Measurement courses; the study identified a major curriculum drafting deficiency in the QS programmes in Nigeria which if addressed could help achieve the much needed improved students’ academic performance. The specific objectives of the study were to determine the performance of QS students in Building construction and construction Measurement Courses; and to determine whether a relationship exist in the performances of QS students in the two subject areas. Purposive sampling technique was used to select Federal Polytechnic Ede, Osun State for the study. Random sampling technique was used to select 241 students who provide data for the study. Close ended questionnaire was used to collect data for the study and data was analyzed using frequency, percentile and correlation analysis. Finding indicates that 43% of the respondents on the average put up good performances in Building Construction Courses while only 19% of the respondents on the average had good grades in Construction Measurement Courses. Results also showed that a significant relationship exist between the performance of QS students in Building Construction and Construction Measurement courses as 83.3% (five out of six pair courses shows significant positive linear correlation. The study recommends that a quick curriculum re-adjustment should be initiated so as to enhance improved academic performance by QS Students especially in Construction Measurement courses.

  15. Construction of a humanized antibody to hepatitis B surface antigen by specificity-determining residues (SDR)-grafting and de-immunization.

    Science.gov (United States)

    Kim, Keun-Soo; Kim, Hyun-Jung; Han, Byung Woo; Myung, Pyung-Keun; Hong, Hyo Jeong

    2010-05-28

    We previously constructed a humanized antibody, HuS10, by grafting the complementarity-determining regions (CDRs) of a parental murine monoclonal antibody into the homologous human antibody sequences. This process is termed CDR grafting. Some residues that were thought to affect the CDR loops and stabilize the structure of the variable regions were retained in the framework region. HuS10 exhibited in vivo virus-neutralizing activity, but its murine content had the potential to elicit immune responses in patients. In this study, to minimize the immunogenic potential of HuS10, we replaced 17 mouse residues in HuS10 with the comparable human residues using specificity-determining residue (SDR)-grafting and de-immunization methods. The resultant humanized antibody, HzS-III, had the same affinity and epitope specificity as HuS10 and had reduced immunogenic potential, as assessed by T-cell epitope analysis. Thus, SDR grafting in combination with de-immunization may be a useful strategy for minimizing the immunogenicity of humanized antibodies. In addition, HzS-III may be a good candidate for immunoprophylaxis of HBV infection. Copyright (c) 2010 Elsevier Inc. All rights reserved.

  16. Construction experience at the Canonsburg UMTRA site

    International Nuclear Information System (INIS)

    Thiers, G.R.; Farnes, L.L.; Wathen, T.R.

    1985-01-01

    Construction of on-site stabilization for over 225,000 cubic yards of abandoned uranium mill tailings in Canonsburg, Pennsylvania, began in October 1983, and is scheduled to be completed in December 1985. This paper describes selected construction experience through October 1984. The following selected events and construction items are discussed in this paper: 1. Construction and operation of a 36,000-square foot, fabric-lined sedimentation basin, including difficulties associated with installation of the liner; 2. Assembly and start-up of the contaminated water treatment plant; 3. Construction of the encapsulation cell test fills, to confirm the performance specification governing the compaction; 4. Excavation, relocation, and placement of contaminated materials, including moisture control and density testing of the radioactive materials; 5. Construction difficulties, including disposition of local leachate from the abandoned industrial complex and an increase in the volume of contaminated material to be encapsulated

  17. Organisational Culture in Construction: An Employee Perspective

    Directory of Open Access Journals (Sweden)

    Raufdeen Rameezdeen

    2012-11-01

    Full Text Available A large number of stakeholders in construction projects makes the construction industry prone to disputes. The historical separation between design and construction add to this phenomenon by having a consultant for design and a contractor for construction. Communication breakdown, frequently, is the first sign of problems, notably in the relationship between the Contractor and the Consultant. Therefore, it appears that the split between design and construction has given rise to two separate cultures in the construction industry. This paper attempts to identify whether there is a difference in organisational culture between Consultants and Contractors taken as two groups and determine whether a specific attribute was related to the cultural differences between the two entities. Based on case studies it was found that consultants are biased towards Clan culture while contractors are biased towards Market culture. However, both groups show similar affinity to Adhocracy and Hierarchy cultures.

  18. Enzyme based soil stabilization for unpaved road construction

    Directory of Open Access Journals (Sweden)

    Renjith Rintu

    2017-01-01

    Full Text Available Enzymes as soil stabilizers have been successfully used in road construction in several countries for the past 30 years. However, research has shown that the successful application of these enzymes is case specific, emphasizing that enzyme performance is dependent on subgrade soil type, condition and the type of enzyme used as the stabilizer. A universal standard or a tool for road engineers to assess the performance of stabilized unbound pavements using well-established enzymes is not available to date. The research aims to produce a validated assessment tool which can be used to predict strength enhancement within a generalized statistical framework. The objective of the present study is to identify new materials for developing the assessment tool which supports enzyme based stabilization, as well as to identify the correct construction sequence for such new materials. A series of characterization tests were conducted on several soil types obtained from proposed construction sites. Having identified the suitable soil type to mix with the enzyme, a trial road construction has been performed to investigate the efficiency of the enzyme stabilization along with the correct construction sequence. The enzyme stabilization has showed significant improvement of the road performance as was evidenced from the test results which were based on site soil obtained before and after stabilization. The research will substantially benefit the road construction industry by not only replacing traditional construction methods with economical/reliable approaches, but also eliminating site specific tests required in current practice of enzyme based road construction.

  19. Quantifying Construction Site Sediment Discharge Risk and Treatment Potential

    Science.gov (United States)

    Ferrell, L.; Beighley, R. E.

    2006-12-01

    Dealing with soil erosion and sediment transport can be a significant challenge during the construction process due to the potentially large spatial and temporal extent and conditions of bare soils. Best Management Practices (BMP) are commonly used to eliminate or reduce offsite discharge of sediment. However, few efforts have investigated the time varying risk of sediment discharge from construction sites, which often have dynamic soil conditions and the potential for less than optimal BMP installations. The goal of this research is to improve the design, implementation and effectiveness of sediment and erosion control at construction sites using site specific, temporal distributions of sediment discharge risk. Sediment risk is determined from individual factors leading to sediment expert, such as rainfall frequency, the adequacy of BMP installations, and the extent and duration of bare soil conditions. This research specifically focuses on quantifying: (a) the effectiveness of temporary sediment and control erosion control BMPs in preventing, containing, and/or treating construction site sediment discharge at varying levels of "proper" installation, and (b) sediment discharge potential from construction sites during different phases of construction, (ex., disturbed earth operations). BMPs are evaluated at selected construction sites in southern California and at the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with soil depths up to 1 meter, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, potential less than optimal installations, and no treatment conditions. Soil conditions are also varied to represent site conditions during different phases of construction (i.e., loose lifts

  20. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  1. New Reactor Siting, Licensing and Construction Experience. Proceedings of the 2. CNRA International Workshop on 'New Reactor Siting, Licensing and Construction Experience'

    International Nuclear Information System (INIS)

    2013-01-01

    This report documents the proceedings from the 2. Workshop on New Reactor Siting, Licensing and Construction Experience. A total of 45 specialists from 16 countries and international organisations attended. The meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the US Nuclear Regulatory Commission (U.S.NRC). The objectives of the workshop were to provide a forum to exchange information on lessons learned from siting, licensing and constructing new nuclear power plants around the world. Key focus areas included siting practices and regulatory positions that have been enhanced as a result of the Fukushima accident; lessons learned from licensing and design review approaches and challenges, construction experience and recommendations for regulatory oversight; and regulatory cooperation on generic and design specific issues through the MDEP specific working groups. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to regulatory cooperation on generic and design specific issues, MDEP working groups (EPR, AP1000), vendor inspection co-operation, digital I and C, and codes and standards. The second technical session was intended to discuss and share regulatory positions on siting practices and enhancements as a result of lessons learned from Fukushima accident. The third technical session addressed the construction experience and regulatory oversight of new reactor construction activities. And the fourth technical session included presentations on the lessons learned from regulatory licensing reviews of new reactor designs

  2. Technical documentation in support of the project-specific analysis for construction and operation of the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Lazaro, M.A.; Vinikour, W. [Argonne National Lab., IL (United States). Environmental Assessment Div.; Allison, T. [Argonne National Lab., IL (United States). Decision and Information Sciences Div.] [and others

    1996-09-01

    This document provides information that supports or supplements the data and impact analyses presented in the National Ignition Facility (NIF) Project-Specific Analysis (PSA). The purposes of NIF are to achieve fusion ignition in the laboratory for the first time with inertial confinement fusion (ICF) technology and to conduct high- energy-density experiments ins support of national security and civilian application. NIF is an important element in the DOE`s science-based SSM Program, a key mission of which is to ensure the reliability of the nation`s enduring stockpile of nuclear weapons. NIF would also advance the knowledge of basic and applied high-energy- density science and bring the nation a large step closer to developing fusion energy for civilian use. The NIF PSA includes evaluations of the potential environmental impacts of constructing and operating the facility at one of five candidate site and for two design options.

  3. [Regional ecological construction and mission of landscape ecology].

    Science.gov (United States)

    Xiao, Duning; Xie, Fuju; Wei, Jianbing

    2004-10-01

    The eco-construction on regional and landscape scale is the one which can be used to specific landscape and intercrossing ecosystem in specific region including performing scientific administration of ecosystem and optimizing environmental function. Recently, the government has taken a series of significant projects into action, such as national forest protection item, partly forest restoration, and adjustment of water, etc. Enforcing regional eco-construction and maintaining the ecology security of the nation have become the strategic requisition. In various regions, different eco-construction should be applied, for example, performing ecological safeguard measure in ecological sensitive zone, accommodating the ecological load in ecological fragile zone, etc., which can control the activities of human being, so that, sustainable development can be reached. Facing opportunity and challenge in the development of landscape ecology, we have some key topics: landscape pattern of ecological security, land use and ecological process, landscape changes under human activity stress, quantitative evaluation of the influence on human being activities, evaluation of zonal ecological security and advance warning of ecological risk, and planning and optimizing of model in landscape eco-construction.

  4. A Bifactor Approach to Model Multifaceted Constructs in Statistical Mediation Analysis

    Science.gov (United States)

    Gonzalez, Oscar; MacKinnon, David P.

    2018-01-01

    Statistical mediation analysis allows researchers to identify the most important mediating constructs in the causal process studied. Identifying specific mediators is especially relevant when the hypothesized mediating construct consists of multiple related facets. The general definition of the construct and its facets might relate differently to…

  5. Language constructs for modular parallel programs

    Energy Technology Data Exchange (ETDEWEB)

    Foster, I.

    1996-03-01

    We describe programming language constructs that facilitate the application of modular design techniques in parallel programming. These constructs allow us to isolate resource management and processor scheduling decisions from the specification of individual modules, which can themselves encapsulate design decisions concerned with concurrence, communication, process mapping, and data distribution. This approach permits development of libraries of reusable parallel program components and the reuse of these components in different contexts. In particular, alternative mapping strategies can be explored without modifying other aspects of program logic. We describe how these constructs are incorporated in two practical parallel programming languages, PCN and Fortran M. Compilers have been developed for both languages, allowing experimentation in substantial applications.

  6. A construction process model for implementing constructability in construction

    NARCIS (Netherlands)

    Langkemper, J.; Al-Jibouri, S.; Reymen, I.M.M.J.; Maas, G.J.; Gassel, van F.

    2003-01-01

    In construction, failure of design professionals to consider how a builder will implement the design can result in scheduling problems, cost escalation, delays and disputes during the construction process. The integration of construction knowledge and experience during planning and design is termed

  7. Increasing a Robust Antigen-Specific Cytotoxic T Lymphocyte Response by FMDV DNA Vaccination with IL-9 Expressing Construct

    Directory of Open Access Journals (Sweden)

    Qiang Zou

    2010-01-01

    Full Text Available Various chemokines and cytokines as adjuvants can be used to improve efficacy of DNA vaccination. In this study, we sought to investigate if a DNA construct expressing IL-9 (designed as proV-IL9 as a molecular adjuvant enhance antigen specific immune responses elicited by the pcD-VP1 DNA vaccination. Mice immunized with pcD-VP1 combined with proV-IL9 developed a strong humoral response. In addition, the coinoculation induced significant higher level of antigen-specific cell proliferation and cytotoxic response. This agreed well with higher expression level of IFN-γ and perforin in CD8+ T cells, but not with IL-17 in these T cells. The results indicate that IL-9 induces the development of IFN-γ-producing CD8+ T cells (Tc1, but not the IL-17-producing CD8+ T cells (Tc17. Up-regulated expressions of BCL-2 and BCL-XL were exhibited in these Tc1 cells, suggesting that IL-9 may trigger antiapoptosis mechanism in these cells. Together, these results demonstrated that IL-9 used as molecular adjuvant could enhance the immunogenicity of DNA vaccination, in augmenting humoral and cellular responses and particularly promoting Tc1 activations. Thus, the IL-9 may be utilized as a potent Tc1 adjuvant for DNA vaccines.

  8. Constructing the 'gender-specific body': A critical discourse analysis of publications in the field of gender-specific medicine.

    Science.gov (United States)

    Annandale, Ellen; Hammarström, Anne

    2011-11-01

    Gender-specific medicine, a new and increasingly influential ethos within medical research and practice, has received little critical attention to date. The objective of this article is to critically examine the attributes of gender-specific medicine as imparted by its advocates. Through a critical discourse analysis of its two leading academic journals, we identify five interrelated discourses: of male/female difference; of hegemonic biology; of men's disadvantages; of biological and social reductionism; and of the fragmented body. Together these comprise a master discourse of the 'gender-specific body'. The discourse of the 'gender-specific body' is discussed in relation to the current neoliberal political agenda which frames healthcare as a market good and locates health and illness in individual bodies rather than in the wider social arrangements of society. We argue that the 'gender-specific body' threatens not only to turn back the clock to a vision of the biological body as fixed and determinate, but to extend this ever deeper into the social imagination. Lost in the process is any meaningful sense of the human body as a relatively open system which develops in interaction with its social world. We propose that, as it gains momentum, the 'gender-specific body' is likely progressively to circumscribe our thinking about the health of women and men in potentially problematic ways.

  9. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam Sluiceway, 2005

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Khan, Fenton; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.; Skalski, John R.

    2006-06-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate fish passage at The Dalles Dam powerhouse in 2005. The goal of the study was to provide information on smolt passage that will inform decisions on long-term measures and operations to enhance sluiceway passage and reduce turbine passage to improve smolt survival at the dam. The study addressed one of the main programs dedicated to improving juvenile salmonid survival at The Dalles Dam: Surface Flow Bypass. The study objectives (see below) were met using a combination of hydroacoustic and hydraulic data. The study incorporated fixed-location hydroacoustic methods across the entire powerhouse, with especially intense sampling using multiple split-beam transducers at all sluiceway portals. We did not sample fish passage at the spillway in 2005. In the sluiceway nearfield, we used an acoustic camera to track fish movements. The fish data were interpreted with hydraulic data from a computational fluid dynamics (CFD) model. Fish passage data were collected in the framework of an “experiment” using a randomized block design (3-day treatments; two treatments) to compare two sluiceway operational configurations: Sluice 2+5 and Sluice 2+19 (six gates open for each configuration). Total project outflow was 76% of the 10-year average for spring and 71% of the 10-year average for summer. Based on these findings, we make the following recommendations: 1) The sluice should be operated 24 h/d from April until November. 2) Open six rather than three sluice gates to take advantage of the maximum hydraulic capacity of the sluiceway. 3) Open the three gates above the western-most operating main turbine unit and the three gates at MU 8 where turbine passage rates are relatively high. 4) Operate the turbine units below open sluice gates as a standard fish operations procedure. 5) Develop hydraulic and entrance enhancements to the sluiceway to tap the potential of The

  10. Generic Guide Specification for Geothermal Heat Pump Systems

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, WKT

    2000-04-12

    The attached Geothermal (Ground-Source) Heat Pump (GHP) Guide Specifications have been developed by Oak Ridge National Laboratory (ORNL) with the intent to assist federal agency sites and engineers in the preparation of construction specifications for GHP projects. These specifications have been developed in the industry-standard Construction Specification Institute (CSI) format and cover several of the most popular members of the family of GHP systems. These guide specifications are applicable to projects whether the financing is with conventional appropriations, arranged by GHP specialty ESCOs under the U.S. Department of Energy's Technology-Specific GHP Super ESPCs, arranged by utilities under Utility Energy Service Contracts (UESCs) or arranged by generalist ESCOs under the various regional ESPCs. These specifications can provide several benefits to the end user that will help ensure successful GHP system installations. GHP guide specifications will help to streamline the specification development, review, and approval process because the architecture and engineering (AE) firm will be working from the familiar CSI format instead of developing the specifications from other sources. The guide specifications help to provide uniformity, standardization, and consistency in both the construction specifications and system installations across multiple federal sites. This standardization can provide future benefits to the federal sites in respect to both maintenance and operations. GHP guide specifications can help to ensure that the agency is getting its money's worth from the GHP system by preventing the use of marginal or inferior components and equipment. The agency and its AE do not have to start from scratch when developing specifications and can use the specification as a template and/or a checklist in developing both the design and the contract documents. The guide specifications can save project costs by reducing the engineering effort required

  11. Probabilistic analysis in the life cycle management of construction deficiencies

    International Nuclear Information System (INIS)

    Zebroski, E.; Starr, C.

    1985-01-01

    The author discusses the urgent need for better systems and procedures for evaluating actual or suspected construction deficiencies in nuclear power plants. The following topics of interest are discussed: summary of tools available, use of plant-specific probabilistic risk assessments, general process for the rational management of construction deficiencies, rationales for the timing of required corrective actions, example of deficiency management in France, proposed screening process, deficiencies calling for corrective actions, institutional obstacles, and specific recommendations

  12. 46 CFR 164.009-3 - Noncombustible materials not requiring specific approval.

    Science.gov (United States)

    2010-10-01

    ...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Noncombustible Materials for... noncombustible materials may be used in merchant vessel construction though not specifically approved under this subpart: (a) Sheet glass, block glass, clay, ceramics, and uncoated fibers. (b) All metals, except...

  13. Causal Factors of Corruption in Construction Project Management: An Overview.

    Science.gov (United States)

    Owusu, Emmanuel Kingsford; Chan, Albert P C; Shan, Ming

    2017-11-11

    The development of efficient and strategic anti-corruption measures can be better achieved if a deeper understanding and identification of the causes of corruption are established. Over the past years, many studies have been devoted to the research of corruption in construction management (CM). This has resulted in a significant increase in the body of knowledge on the subject matter, including the causative factors triggering these corrupt practices. However, an apropos systematic assessment of both past and current studies on the subject matter which is needful for the future endeavor is lacking. Moreover, there is an absence of unified view of the causative factors of corruption identified in construction project management (CPM). This paper, therefore, presents a comprehensive review of the causes of corruption from selected articles in recognized construction management journals to address the mentioned gaps. A total number of 44 causes of corruption were identified from 37 publications and analyzed in terms of existing causal factors of corruption, annual trend of publications and the thematic categorization of the identified variables. The most identifiable causes were over close relationships, poor professional ethical standards, negative industrial and working conditions, negative role models and inadequate sanctions. A conceptual framework of causes of corruption was established, after categorizing the 44 variables into five unique categories. In descending order, the five constructs are Psychosocial-Specific Causes, Organizational-Specific Causes, Regulatory-Specific Causes, Project-Specific Causes and Statutory-Specific Causes. This study extends the current literature of corruption research in construction management and contributes to a deepened understanding of the causal instigators of corruption identified in CPM. The findings from this study provide valuable information and extended knowledge to industry practitioners and policymakers as well as

  14. Horizon Dam design, construction, and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, B. [EBA Engineering Consultants Ltd., Nanaimo, BC (Canada); Sisson, R. [Canadian Natural Resources Ltd., Fort McMurray, AB (Canada)

    2010-07-01

    This paper discussed the design and construction of the Tar River Diversion Dam and the quality management system (QMS) used during construction. The project was unusual in that the company constructed the project using its own workforce, without contractors, under challenging schedule and site conditions. The topography, geology and geotechnical aspects of the site were discussed along with the embankment design, seepage control measures and construction execution. The QMS was designed to fit the needs of the unique construction execution strategy and meet safety, reliability, performance, and operation requirements, comply with all regulations and approval conditions, and identify and communicate risk to the appropriate entity. Specifications and construction procedures had to be modified to accommodate equipment operators trained with the skills and techniques of mine operations, not those associated with conventional civil construction projects. Foundation movement identified during construction required mid-build design changes, construction rescheduling, and additional deformation analyses to determine long-term stability. The QMS allowed changes in the understanding of site conditions to be quickly addressed and risks to be identified and cost-effectively mitigated. Design consultants were used to modify designs and appropriately identify and mitigate risks. The approach to embankment construction was successful because the QMS included processes for change management, issue resolution, and risk-benefit assessment, and because experienced personnel had a regular presence on the construction site and worked collaboratively. The effective QMS was deemed to be integral to the success of the construction project. 1 tab., 7 figs.

  15. Historical construction costs of global nuclear power reactors

    International Nuclear Information System (INIS)

    Lovering, Jessica R.; Yip, Arthur; Nordhaus, Ted

    2016-01-01

    The existing literature on the construction costs of nuclear power reactors has focused almost exclusively on trends in construction costs in only two countries, the United States and France, and during two decades, the 1970s and 1980s. These analyses, Koomey and Hultman (2007); Grubler (2010), and Escobar-Rangel and Lévêque (2015), study only 26% of reactors built globally between 1960 and 2010, providing an incomplete picture of the economic evolution of nuclear power construction. This study curates historical reactor-specific overnight construction cost (OCC) data that broaden the scope of study substantially, covering the full cost history for 349 reactors in the US, France, Canada, West Germany, Japan, India, and South Korea, encompassing 58% of all reactors built globally. We find that trends in costs have varied significantly in magnitude and in structure by era, country, and experience. In contrast to the rapid cost escalation that characterized nuclear construction in the United States, we find evidence of much milder cost escalation in many countries, including absolute cost declines in some countries and specific eras. Our new findings suggest that there is no inherent cost escalation trend associated with nuclear technology. - Highlights: •Comprehensive analysis of nuclear power construction cost experience. •Coverage for early and recent reactors in seven countries. •International comparisons and re-evaluation of learning. •Cost trends vary by country and era; some experience cost stability or decline.

  16. Language-specific dysgraphia in Korean stroke patients.

    Science.gov (United States)

    Yoon, Ji Hye; Suh, Mee Kyung; Kim, HyangHee

    2010-12-01

    We investigated how changes in the writing of 14 Korean stroke patients reflect the unique features of the Korean writing system. The Korean writing system, Han-geul, has both linguistic and visuospatial/constructive characteristics. In the visuospatial construction of a syllable, the component consonant(s) and vowel(s) must be arranged from top-to-bottom and/or left-to-right within the form of a square. This syllabic organization, unique to Korean writing, may distinguish dysgraphia in Korean patients from the disorder in other languages, and reveal the effects of stroke on visuospatial/constructive abilities. We compared 2 groups of patients affected by stroke, 1 group with left hemisphere (LH) lesions and the other with right hemisphere (RH) lesions. We instructed them to write from a dictation of 90 monosyllabic stimuli, each presented with a real word cue. Patients had to repeat a target syllable and a word cue, and then to write the target syllable only. Patients with LH and RH lesions produced qualitatively different error patterns. While the LH lesion group produced primarily linguistic errors, visuospatial/constructive errors predominated in the group with RH lesions. With regard to language-specific features, these Korean patients with RH lesions produced diverse visuospatial/constructive errors not commonly observed in dysgraphia of the English language. Language-specific writing errors by Korean stroke patients reflect the unique characteristics of Korean writing, which include the arrangement of strokes and graphemes within a square syllabic form by dimensional and spatial rules. These findings support the notion that the Korean writing system possesses a language-specific nature with both linguistic and visuospatial/constructive processes. Distinctive patterns of dysgraphia in the Korean language also suggest interactivity between linguistic and visuospatial/constructive levels of processing. This study is noteworthy for its systematic description of

  17. Returnable packaging for non-specific building materials

    NARCIS (Netherlands)

    Gassel, van F.J.M.

    1998-01-01

    A certain amount of construction waste comes from disposable packaging and this waste is ecologically damaging, one solution would be to reduce the disposable by using returnable packaging for non-specific construction products. To find out if this solution is feasible a study has been carried out

  18. Implementation of GPS controlled highway construction equipment, phase III.

    Science.gov (United States)

    2009-02-01

    Beginning in 2006, WisDOT and the Construction Material and Support Center (CMSC) at UW-Madison worked : together to develop the specifications and the QA/QC procedures for GPS machine guidance on highway grading : projects. These specifications and ...

  19. Organizing Construction Practices in Different Cultural Contexts

    DEFF Research Database (Denmark)

    Thuesen, Christian; Rasmussen, Christian K. S.

    2013-01-01

    a number of characteristics and challenges related to the cultural context have been identified highlighting a central issue in existing and future construction practices due to the globalization and thereby increasing importance of cultural understanding in project-based organizing. The empirical findings......This paper presents in-depth case studies of construction practices with a specific focus on understanding the emergent and dynamic nature of construction management in different cultural contexts. The cases are based on actual working-experiences by the author as an assistant project manager...... participating in the construction management on site working for three different contractors in different cultural contexts: (1) Construir Futuro S.A. in Quito, Ecuador; (2) Anker Hansen & co. A/S in Copenhagen, Denmark; and (3) E. Pihl & Soen A/S in Stockholm, Sweden. Based on these explorative case studies...

  20. Innovation in the Danish Construction Sector

    DEFF Research Database (Denmark)

    Bonke, Sten; Bang, Henrik; Clausen, Lennie

    This paper is specifically concerned with the following question: Which current public policy instruments facilitate innovation in construction, Thus, the analysis applied in the paper, focuses on public policy instruments, how they are used and to which degree they enhance innovativeness...

  1. Decision problems in management of construction projects

    Science.gov (United States)

    Szafranko, E.

    2017-10-01

    In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.

  2. Research on Green Construction Technology Applied at Guangzhou Hongding Building Project

    Science.gov (United States)

    Lou, Yong Zhong

    2018-06-01

    The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.

  3. Construction demolition wastes, Waelz slag and MSWI bottom ash: a comparative technical analysis as material for road construction.

    Science.gov (United States)

    Vegas, I; Ibañez, J A; San José, J T; Urzelai, A

    2008-01-01

    The objective of the study is to analyze the technical suitability of using secondary materials from three waste flows (construction and demolition waste (CDW), Waelz slag and municipal solid waste incineration (MSWI) bottom ash), under the regulations and standards governing the use of materials for road construction. A detailed technical characterization of the materials was carried out according to Spanish General Technical Specifications for Road Construction (PG3). The results show that Waelz slag can be adequate for using in granular structural layers, while CDW fits better as granular material in roadbeds. Likewise, fresh MSWI bottom ash can be used as roadbed material as long as it does not contain a high concentration of soluble salts. This paper also discusses the adequacy of using certain traditional test methods for natural soils when characterizing secondary materials for use as aggregates in road construction.

  4. Construction safety management guide for use with DOE Order 440.1

    International Nuclear Information System (INIS)

    1997-01-01

    DOE Order (DOE O) 440.1, Worker Protection Management for DOE Federal and Contractor Employees, establishes the framework for an effective worker protection program to reduce or eliminate accidental losses, injuries, and illnesses by providing workers with places of employment free of recognized hazards. In addition to prescribing program requirements applicable to all activities performed by DOE and its contractors, DOE O 440.1 provides specific requirements applicable only to construction activities. The intent of these construction-specific requirements is to compel the proactive management of construction safety on a project-by-project basis and, to the greatest extent possible, integrate the management of safety and health, both in terms of project personnel and management methodologies, with the management of the other primary elements of construction project performance: quality, cost and schedule

  5. Licensing of the OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.

    2007-01-01

    This paper presents a description of the licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) OPAL reactor. It addresses the Construction Licence, the interface between ANSTO, INVAP (the contractor with responsibility for design and construction of the facility) and the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA, the Australian nuclear regulator) during the construction of OPAL, specific licensing issues that have arisen during the construction and commissioning process, and the Operating Licence Application. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators

  6. Lean construction management the Toyota way

    CERN Document Server

    Gao, Shang

    2014-01-01

    The book presents a mixed research method adopted to assess and present the Toyota Way practices within construction firms in general and for firms in China specifically. The results of an extensive structured questionnaire survey based on the Toyota Way-styled attributes identified were developed, and data collected from building professionals working in construction firms is presented. The quantitative data presented in the book explains the status quo of the Toyota Way-styled practices implemented in the construction industry, as well as the extent to which these attributes were perceived for lean construction management. The book highlights all the actionable attributes derived from the Toyota Way model appreciated by the building professionals, but alerts the readers that some attributes felled short of implementation. Further findings from in-depth interviews and case studies are also presented in the book to provide to readers an understanding how these Toyota Way practices can be implemented in real-l...

  7. Construction dispute research conceptualisation, avoidance and resolution

    CERN Document Server

    2014-01-01

    There are three specific purposes of Construction Dispute Research. First, this volume aims to summarise studies on construction dispute. Second, apart from the theoretical constructs, where appropriate empirical tests are also included. This approach serves to go beyond the commonly used anecdotal approach for the subject matters. Third, it is the sincere hope of the authors that this book will help shaping research agenda of construction dispute.  The studies are mostly framed from a management perspective drawing on methods and concepts in contract law, economics, psychology and management science.   The book has twenty chapters that are arranged in four parts covering conceptualisation, avoidance, negotiation and mediation. Part 1 is devoted for dispute conceptualisation. A building is only as strong as its foundation. Thus it is no better start to study construction dispute by conceptualisation. The theme of Part 2 is dispute avoidance. The conventional wisdom of ‘prevention is better than cure’ se...

  8. Slurry walls and slurry trenches - construction quality control

    International Nuclear Information System (INIS)

    Poletto, R.J.; Good, D.R.

    1997-01-01

    Slurry (panel) walls and slurry trenches have become conventional methods for construction of deep underground structures, interceptor trenches and hydraulic (cutoff) barriers. More recently polymers mixed with water are used to stabilize the excavation instead of bentonite slurry. Slurry walls are typically excavated in short panel segments, 2 to 7 m (7 to 23 ft) long, and backfilled with structural materials; whereas slurry trenches are fairly continuous excavations with concurrent backfilling of blended soils, or cement-bentonite mixtures. Slurry trench techniques have also been used to construct interceptor trenches. Currently no national standards exist for the design and/or construction of slurry walls/trenches. Government agencies, private consultants, contractors and trade groups have published specifications for construction of slurry walls/trenches. These specifications vary in complexity and quality of standards. Some place excessive emphasis on the preparation and control of bentonite or polymer slurry used for excavation, with insufficient emphasis placed on quality control of bottom cleaning, tremie concrete, backfill placement or requirements for the finished product. This has led to numerous quality problems, particularly with regard to identification of key depths, bottom sediments and proper backfill placement. This paper will discuss the inspection of slurry wall/trench construction process, identifying those areas which require special scrutiny. New approaches to inspection of slurry stabilized excavations are discussed

  9. Viability of Bioprinted Cellular Constructs Using a Three Dispenser Cartesian Printer.

    Science.gov (United States)

    Dennis, Sarah Grace; Trusk, Thomas; Richards, Dylan; Jia, Jia; Tan, Yu; Mei, Ying; Fann, Stephen; Markwald, Roger; Yost, Michael

    2015-09-22

    Tissue engineering has centralized its focus on the construction of replacements for non-functional or damaged tissue. The utilization of three-dimensional bioprinting in tissue engineering has generated new methods for the printing of cells and matrix to fabricate biomimetic tissue constructs. The solid freeform fabrication (SFF) method developed for three-dimensional bioprinting uses an additive manufacturing approach by depositing droplets of cells and hydrogels in a layer-by-layer fashion. Bioprinting fabrication is dependent on the specific placement of biological materials into three-dimensional architectures, and the printed constructs should closely mimic the complex organization of cells and extracellular matrices in native tissue. This paper highlights the use of the Palmetto Printer, a Cartesian bioprinter, as well as the process of producing spatially organized, viable constructs while simultaneously allowing control of environmental factors. This methodology utilizes computer-aided design and computer-aided manufacturing to produce these specific and complex geometries. Finally, this approach allows for the reproducible production of fabricated constructs optimized by controllable printing parameters.

  10. Interim safety equipment list for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1996-01-01

    The purpose of this supporting document is to provide safety classifications for systems, structures, and components of the Tank 241-C-106 Waste Retrieval Sluicing System (WRSS) and to document the methodology used to develop these safety classifications. The WRSS requires two transfer lines, one to carry sluiced waste slurry to tank 241-AY-102 and the other to return supernatant to tank 241-C-106; pumps in each tank; sluicers to direct the supernatant stream inside tank 241-C-106; a slurry distributor in tank 241-AY-102; heating, ventilation, and air conditioning for tank 241-C-106; and instrumentation and control devices

  11. Hanford Site Tank 241-C-108 Residual Waste Contaminant Release Models and Supporting Data

    Energy Technology Data Exchange (ETDEWEB)

    Cantrell, Kirk J.; Krupka, Kenneth M.; Geiszler, Keith N.; Arey, Bruce W.; Schaef, Herbert T.

    2010-06-18

    This report presents the results of laboratory characterization, testing, and analysis for a composite sample (designated 20578) of residual waste collected from single-shell tank C-108 during the waste retrieval process after modified sluicing. These studies were completed to characterize concentration and form of contaminant of interest in the residual waste; assess the leachability of contaminants from the solids; and develop release models for contaminants of interest. Because modified sluicing did not achieve 99% removal of the waste, it is expected that additional retrieval processing will take place. As a result, the sample analyzed here is not expected to represent final retrieval sample.

  12. Interim safety equipment list for 241-C-106 waste retrieval, project W-320

    Energy Technology Data Exchange (ETDEWEB)

    Conner, J.C.

    1996-01-25

    The purpose of this supporting document is to provide safety classifications for systems, structures, and components of the Tank 241-C-106 Waste Retrieval Sluicing System (WRSS) and to document the methodology used to develop these safety classifications. The WRSS requires two transfer lines, one to carry sluiced waste slurry to tank 241-AY-102 and the other to return supernatant to tank 241-C-106; pumps in each tank; sluicers to direct the supernatant stream inside tank 241-C-106; a slurry distributor in tank 241-AY-102; heating, ventilation, and air conditioning for tank 241-C-106; and instrumentation and control devices.

  13. Cold test plan for the Old Hydrofracture Facility tank contents removal project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-11-01

    This Old Hydrofracture Facility (OHF) Tanks Contents Removal Project Cold Test Plan describes the activities to be conducted during the cold test of the OHF sluicing and pumping system at the Tank Technology Cold Test Facility (TTCTF). The TTCTF is located at the Robotics and Process Systems Complex at the Oak Ridge National Laboratory (ORNL). The cold test will demonstrate performance of the pumping and sluicing system, fine-tune operating instructions, and train the personnel in the actual work to be performed. After completion of the cold test a Technical Memorandum will be prepared documenting completion of the cold test, and the equipment will be relocated to the OHF site

  14. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  15. Construction of bifunctional molecules specific to antigen and antibody’s Fc-fragment by fusion of scFv-antibodies with staphylococcal protein A

    Directory of Open Access Journals (Sweden)

    Kolibo D. V.

    2009-06-01

    Full Text Available Aim. To develop approach for detection of scFv and their complexes with antigens. Methods. The fusion proteins, which include sequences of scFv and staphylococcal protein A, were constructed and the obtained bifunctional molecules were immunochemically analysed. Results. It was shown, that scFv fused with protein A and their complexes with antigens are effectively recognized by labelled immunoglobulins with unrestricted antigenic specificity. Conclusions. The fusion of scFv with protein A fragment is a perspective approach to increase the efficiency of application in ELISA. The obtained scFv, fused with protein A, could be used for development of test-systems for the detection of diphtheria toxin.

  16. Specifics of system of external influences on the life cycle of a construction object

    Directory of Open Access Journals (Sweden)

    Aleksanin Aleksander

    2016-01-01

    Full Text Available There is a very important issue today which includes the harmonious and effective development of the system ‘man –environment’. Construction is a branch of material production, which has a significant negative impact on the world around us. It is necessary to plan and operate processes of construction at all stages of the life cycle of a building without exception, to prevent of ecological threats. The article describes the concept of ‘life cycle’ as applied to various fields of knowledge, analyzes existing in the scientific literature division of the life cycle of buildings in the periods, proposes own approach to the division of periods of the life cycle on the basis of resource-saving. The article proposes the creation of a unified organizational system for the effective management of all periods with the constituent phases and formulates the main external influences on the building life cycle.

  17. Specifics of system of external influences on the life cycle of a construction object

    Directory of Open Access Journals (Sweden)

    Aleksanin Aleksander

    2016-01-01

    Full Text Available There is a very important issue today which includes the harmonious and effective development of the system ‘man–environment’. Construction is a branch of material production, which has a significant negative impact on the world around us. It is necessary to plan and operate processes of construction at all stages of the life cycle of a building without exception, to prevent of ecological threats. The article describes the concept of ‘life cycle’ as applied to various fields of knowledge, analyzes existing in the scientific literature division of the life cycle of buildings in the periods, proposes own approach to the division of periods of the life cycle on the basis of resource-saving. The article proposes the creation of a unified organizational system for the effective management of all periods with the constituent phases and formulates the main external influences on the building life cycle.

  18. Construction Marketing: Developing a Reference Framework

    Directory of Open Access Journals (Sweden)

    Mahmood Mokhtariani

    2017-01-01

    Full Text Available Successful companies are strongly committed to marketing management. However, marketing is either misunderstood or completely neglected in many construction companies, mainly due to the difficulty of applying conventional marketing in the industry, accompanied by the lack of sufficient research on the nature of marketing and tailored marketing theories and strategies for the construction. This study attempts to fill a part of this gap by examining the nature of the construction industry from the marketing viewpoint and developing a comprehensive framework. A systematic investigation into the nature via a combination of Kotler’s product classification system and Lovelock’s classification criteria reveals that construction is an “industrial, project-based, and primarily service-oriented” (IPS product with specific characteristics from the marketing perspective. Based on this nature, a reference framework for strategic marketing planning is developed through a literature review based on grounded theory and using the focus group discussion as a refinement tool. The framework indicates that construction companies are involved in and should plan for three working fields—project-based activities, relationship marketing, and marketing mix-related functions. The findings provide a fundamental basis that helps researchers and practitioners gain a true understanding of the concepts and scope of construction marketing and draw a clear and practical roadmap for future work.

  19. Assessing construction innovation: theoretical and practical perspectives

    Directory of Open Access Journals (Sweden)

    Peter Davis

    2016-09-01

    Full Text Available Innovation is key for productivity improvement and advancements in different sectors of the economy, including the construction sector.  The criticism of the slow pace of innovation in construction industry may be unwarranted, considering the structure of the industry and nature of the construction business.  The loosely coupled nature of firms, mostly Small and Medium Enterprises (SME’s, delivering ‘projects’ through partial engagement, together with the distinction between the project innovation and firm innovation makes it difficult to extract innovations in a meaningful way.  The problem also lies in conceptualising, defining, articulating and assessing innovation in construction.  The literature is replete with research into construction innovation, however, there is limited research into understanding how innovation is perceived and narrated in practice.  The paper aims to explore how innovation is assessed and narrated in construction, specifically analysing theory and practice perspectives.  A theoretical model was constructed from a structured literature review illustrating existing discourse and narratives of construction innovation assessment.  A qualitative analysis of ‘Professional Excellence in Building’ submission documents to the Australian Institute of Building was performed to identify the practice perspective of innovation.  The findings suggest that internal organizational and process innovation account for the majority of improvements identified.  Importantly a taxonomy of narrative is developed that articulates how the construction industry in Australia views industry innovation.

  20. Textile materials for lightweight constructions technologies, methods, materials, properties

    CERN Document Server

    2016-01-01

    In this book, experts on textile technologies convey both general and specific informa­tion on various aspects of textile engineering, ready-made technologies, and textile chemistry. They describe the entire process chain from fiber materials to various yarn constructions, 2D and 3D textile constructions, preforms, and interface layer design. In addition, the authors introduce testing methods, shaping and simulation techniques for the characterization of and structural mechanics calculations on anisotropic, pliable high-performance textiles, including specific examples from the fields of fiber plastic composites, textile concrete, and textile membranes. Readers will also be familiarized with the potential offered by increasingly popular textile structures, for instance in the fields of composite technology, construction technology, security technology, and membrane technology. Textile materials and semi-finished products have widely varied potential characteristics, and are commonly used as essential element...

  1. Governing Civil Society Organisations and Constructing the Common Good

    DEFF Research Database (Denmark)

    Hein Jessen, Mathias

    This paper argues that civil society is something that must be produced and constructed in order to come into existence. This construction entails a specific production of what civil society is, which values are (and should be) present in it, what the common good is and how civil society and civil...... with specific (good) values, but is at the same time instrumentalised to provide welfare services the state can and will no longer provide. Civil society, civil society organisations and the common good are not given entities, but constantly produced and mobilised in different political conjunctures....

  2. Simultaneous neuron- and astrocyte-specific fluorescent marking

    Energy Technology Data Exchange (ETDEWEB)

    Schulze, Wiebke [Laboratory of Molecular Neuropharmacology, Graduate School of Pharmaceutical Sciences, Osaka University, 1-6 Yamadaoka, Suita, Osaka 565-0871 (Japan); Hayata-Takano, Atsuko [Molecular Research Center for Children' s Mental Development, United Graduate School of Child Development, Osaka University, Kanazawa University, Hamamatsu University School of Medicine, Chiba University and University of Fukui, 2-2 Yamadaoka, Suita, Osaka 565-0871 (Japan); Kamo, Toshihiko [Laboratory of Molecular Neuropharmacology, Graduate School of Pharmaceutical Sciences, Osaka University, 1-6 Yamadaoka, Suita, Osaka 565-0871 (Japan); Nakazawa, Takanobu, E-mail: takanobunakazawa-tky@umin.ac.jp [iPS Cell-based Research Project on Brain Neuropharmacology and Toxicology, Graduate School of Pharmaceutical Sciences, Osaka University, 1-6 Yamadaoka, Suita, Osaka 565-0871 (Japan); Nagayasu, Kazuki [iPS Cell-based Research Project on Brain Neuropharmacology and Toxicology, Graduate School of Pharmaceutical Sciences, Osaka University, 1-6 Yamadaoka, Suita, Osaka 565-0871 (Japan); Kasai, Atsushi; Seiriki, Kaoru [Laboratory of Molecular Neuropharmacology, Graduate School of Pharmaceutical Sciences, Osaka University, 1-6 Yamadaoka, Suita, Osaka 565-0871 (Japan); Interdisciplinary Program for Biomedical Sciences, Institute for Academic Initiatives, Osaka University, 1-1 Yamadaoka, Suita, Osaka 565-0871 (Japan); Shintani, Norihito [Laboratory of Molecular Neuropharmacology, Graduate School of Pharmaceutical Sciences, Osaka University, 1-6 Yamadaoka, Suita, Osaka 565-0871 (Japan); Ago, Yukio [Laboratory of Medicinal Pharmacology, Graduate School of Pharmaceutical Sciences, Osaka University, 1-6 Yamadaoka, Suita, Osaka 565-0871 (Japan); Farfan, Camille [Laboratory of Molecular Neuropharmacology, Graduate School of Pharmaceutical Sciences, Osaka University, 1-6 Yamadaoka, Suita, Osaka 565-0871 (Japan); and others

    2015-03-27

    Systematic and simultaneous analysis of multiple cell types in the brain is becoming important, but such tools have not yet been adequately developed. Here, we aimed to generate a method for the specific fluorescent labeling of neurons and astrocytes, two major cell types in the brain, and we have developed lentiviral vectors to express the red fluorescent protein tdTomato in neurons and the enhanced green fluorescent protein (EGFP) in astrocytes. Importantly, both fluorescent proteins are fused to histone 2B protein (H2B) to confer nuclear localization to distinguish between single cells. We also constructed several expression constructs, including a tandem alignment of the neuron- and astrocyte-expression cassettes for simultaneous labeling. Introducing these vectors and constructs in vitro and in vivo resulted in cell type-specific and nuclear-localized fluorescence signals enabling easy detection and distinguishability of neurons and astrocytes. This tool is expected to be utilized for the simultaneous analysis of changes in neurons and astrocytes in healthy and diseased brains. - Highlights: • We develop a method for the specific fluorescent labeling of neurons and astrocytes. • Neuron-specific labeling is achieved using Scg10 and synapsin promoters. • Astrocyte-specific labeling is generated using the minimal GFAP promoter. • Nuclear localization of fluorescent proteins is achieved with histone 2B protein.

  3. Simultaneous neuron- and astrocyte-specific fluorescent marking

    International Nuclear Information System (INIS)

    Schulze, Wiebke; Hayata-Takano, Atsuko; Kamo, Toshihiko; Nakazawa, Takanobu; Nagayasu, Kazuki; Kasai, Atsushi; Seiriki, Kaoru; Shintani, Norihito; Ago, Yukio; Farfan, Camille

    2015-01-01

    Systematic and simultaneous analysis of multiple cell types in the brain is becoming important, but such tools have not yet been adequately developed. Here, we aimed to generate a method for the specific fluorescent labeling of neurons and astrocytes, two major cell types in the brain, and we have developed lentiviral vectors to express the red fluorescent protein tdTomato in neurons and the enhanced green fluorescent protein (EGFP) in astrocytes. Importantly, both fluorescent proteins are fused to histone 2B protein (H2B) to confer nuclear localization to distinguish between single cells. We also constructed several expression constructs, including a tandem alignment of the neuron- and astrocyte-expression cassettes for simultaneous labeling. Introducing these vectors and constructs in vitro and in vivo resulted in cell type-specific and nuclear-localized fluorescence signals enabling easy detection and distinguishability of neurons and astrocytes. This tool is expected to be utilized for the simultaneous analysis of changes in neurons and astrocytes in healthy and diseased brains. - Highlights: • We develop a method for the specific fluorescent labeling of neurons and astrocytes. • Neuron-specific labeling is achieved using Scg10 and synapsin promoters. • Astrocyte-specific labeling is generated using the minimal GFAP promoter. • Nuclear localization of fluorescent proteins is achieved with histone 2B protein

  4. Factors Affecting Competitive Strategies in International Construction Companies

    Directory of Open Access Journals (Sweden)

    Tuğçe ERCAN

    2013-02-01

    Full Text Available Due to rising competition in the international construction market, competitive strategies are becoming ever more important. This study aims to identify the level of importance of a variety of competitive strategies in construction companies to create a theoretical framework for competitive strategies in international construction business. In the questionnaire titled: ‘Identifying the Parameters of Strategic Performance Comparison Tool in International Construction Companies’, professionals were asked the level of importance of parameters in acquiring a competitive edge in international markets for construction companies. 82 people who currently work for international construction companies responded the questionnaire. The Relative Importance Index (RII of competitive strategies in construction companies was calculated using the survey results. The construct was redesigned through the Pearson Correlation and principal components analysis (PCA. The results of the PCA denoted that the construct of competitive strategies in construction companies can be explained by three main factors in sync with Porter’s three generic competitive strategy types: F1 Cost Leadership in Construction, F2 Specialization and Focus and F3 Differentiation in Construction and Company Resources. The analysis results show that the competitive strategies related to “Differentiation in Construction and Company Resources” have a greater importance level, while the diversification strategies have a lower importance level. Which means specialization in some type of construction activity and focus on a specific group of customers is more effective than diversification strategies in gaining a competitive advantage in the market.

  5. Design and Construction Documents Associated with N232, Sustainability Base

    Science.gov (United States)

    Zornetzer, Steven F.; Schuler, Raymond F.; Grymes, Rosalind A.

    2014-01-01

    This request comprehensively covers documents associated with the design and construction of Sustainability Base, N232. The intent of this project specifically envisioned broad dissemination of these materials to others undertaking the design and construction of high-performing energy- and resource-efficient buildings in comparable climate zones.

  6. 48 CFR 52.236-21 - Specifications and Drawings for Construction.

    Science.gov (United States)

    2010-10-01

    ... ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of... shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or..., diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data...

  7. Traumatic brain injuries in the construction industry.

    Science.gov (United States)

    Colantonio, Angela; McVittie, Doug; Lewko, John; Yin, Junlang

    2009-10-01

    This study analyses factors associated with work-related traumatic brain injury (TBI), specifically in the construction industry in Ontario, Canada. This cross-sectional study utilized data extracted from the Ontario Workplace Safety and Insurance Board (WSIB) records indicating concussion/intracranial injury that resulted in days off work in 2004-2005. Analyses of 218 TBI cases revealed that falls were the most common cause of injury, followed by being struck by or against an object. Mechanisms of injury and the temporal profile of injury also varied by age. For instance, a significantly higher proportion of injuries occurred in the mornings for young workers compared to older workers. The results of this study provide important information for prevention of TBI which suggest important age-specific strategies for workers in the construction industry.

  8. Remedial Investigation Report on Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1. Main Text

    International Nuclear Information System (INIS)

    1994-08-01

    This document is a report on the remedial investigation (RI) of Chestnut Ridge Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant. Chestnut Ridge OU 2 consists of Upper McCoy Branch (UMB), the Filled Coal Ash Pond (FCAP), and the area surrounding the Sluice Channel formerly associated with coal ash disposal in the FCAP. Chestnut Ridge OU 2 is located within the U.S. Department of Energy's (DOE's) Oak Ridge Reservation in Anderson County, Tennessee, approximately 24 miles west of Knoxville. The pond is an 8.5-acre area on the southern slope of Chestnut Ridge, 0.5 mile south of the main Y-12 Plant and geographically separated from the Y-12 Plant by Chestnut Ridge. The elevation of the FCAP is ∼ 950 ft above mean sea level (msl), and it is relatively flat and largely vegetated. Two small ponds are usually present at the northeast and northwest comers of the FCAP. The Sluice Channel Area extends ∼1000 ft from the northern margin of the FCAP to the crest of Chestnut Ridge, which has an elevation of ∼1100 ft above msl. The Sluice Channel Area is largely vegetated also. McCoy Branch runs from the top of Chestnut Ridge across the FCAP into Rogers Quarry and out of the quarry where it runs a short distance into Milton Hill Lake at McCoy Embayment, termed UMB. The portion south of Rogers Quarry, within Chestnut Ridge OU 4, is termed Lower McCoy Branch. The DOE Oak Ridge Y-12 Plant disposed of coal ash from its steam plant operations as a slurry that was discharged into an ash retention impoundment; this impoundment is the FCAP. The FCAP was built in 1955 to serve as a settling basin after coal ash slurried over Chestnut Ridge from the Y-12 Plant. The FCAP was constructed by building an earthen dam across the northern tributary of McCoy Branch. The dam was designed to hold 20 years of Y-12 steam plant ash. By July 1967, ash had filled up the impoundment storage behind the dam to within 4 ft of the top

  9. Remedial Investigation Report on Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1. Main Text

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document is a report on the remedial investigation (RI) of Chestnut Ridge Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant. Chestnut Ridge OU 2 consists of Upper McCoy Branch (UMB), the Filled Coal Ash Pond (FCAP), and the area surrounding the Sluice Channel formerly associated with coal ash disposal in the FCAP. Chestnut Ridge OU 2 is located within the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation in Anderson County, Tennessee, approximately 24 miles west of Knoxville. The pond is an 8.5-acre area on the southern slope of Chestnut Ridge, 0.5 mile south of the main Y-12 Plant and geographically separated from the Y-12 Plant by Chestnut Ridge. The elevation of the FCAP is {approximately} 950 ft above mean sea level (msl), and it is relatively flat and largely vegetated. Two small ponds are usually present at the northeast and northwest comers of the FCAP. The Sluice Channel Area extends {approximately}1000 ft from the northern margin of the FCAP to the crest of Chestnut Ridge, which has an elevation of {approximately}1100 ft above msl. The Sluice Channel Area is largely vegetated also. McCoy Branch runs from the top of Chestnut Ridge across the FCAP into Rogers Quarry and out of the quarry where it runs a short distance into Milton Hill Lake at McCoy Embayment, termed UMB. The portion south of Rogers Quarry, within Chestnut Ridge OU 4, is termed Lower McCoy Branch. The DOE Oak Ridge Y-12 Plant disposed of coal ash from its steam plant operations as a slurry that was discharged into an ash retention impoundment; this impoundment is the FCAP. The FCAP was built in 1955 to serve as a settling basin after coal ash slurried over Chestnut Ridge from the Y-12 Plant. The FCAP was constructed by building an earthen dam across the northern tributary of McCoy Branch. The dam was designed to hold 20 years of Y-12 steam plant ash. By July 1967, ash had filled up the impoundment storage behind the dam to within 4 ft of the top.

  10. Constructing a Tibetan Demos in Exile

    DEFF Research Database (Denmark)

    Brox, Trine

    2012-01-01

    homeland. Two specific instances of the construction of a transnational exile demos are investigated: citizenship and political representation. The Tibetan Government-in-Exile's formalized idea of citizenship builds upon ideals of equal and loyal members who form a single unit bounded by a common cause...

  11. Spatio-Temporal Data Construction

    Directory of Open Access Journals (Sweden)

    Hai Ha Le

    2013-08-01

    Full Text Available On the route to a spatio-temporal geoscience information system, an appropriate data model for geo-objects in space and time has been developed. In this model, geo-objects are represented as sequences of geometries and properties with continuous evolution in each time interval. Because geomodeling software systems usually model objects at specific time instances, we want to interpolate the geometry and properties from two models of an object with only geometrical constraints (no physical or mechanical constraints. This process is called spatio-temporal data construction or morphological interpolation of intermediate geometries. This paper is strictly related to shape morphing, shape deformation, cross-parameterization and compatible remeshing and is only concerned with geological surfaces. In this study, two main sub-solutions construct compatible meshes and find trajectories in which vertices of the mesh evolve. This research aims to find an algorithm to construct spatio-temporal data with some constraints from the geosciences, such as cutting surfaces by faulting or fracturing phenomena and evolving boundaries attached to other surfaces. Another goal of this research is the implementation of the algorithm in a software product, namely a gOcad plug-in. The four main procedures of the algorithm are cutting the surfaces, setting up constraints, partitioning and calculating the parameterizations and trajectories. The software has been tested to construct data for a salt dome and other surfaces in regard to the geological processes of faulting, deposition and erosion. The result of this research is an algorithm and software for the construction of spatio-temporal data.

  12. Identifying Causes of Construction Waste – Case of Central Region of Peninsula Malaysia

    OpenAIRE

    Sasitharan Nagapan; Ismail Abdul Rahman; Ade Asmi; Aftab Hameed Memon; Rosli Mohammad Zin

    2012-01-01

    Construction waste becomes a global issue facing by practitioners and researchers around the world. Waste can affects success of construction project significantly. More specifically, it has major impact on construction cost, construction time, productivity and sustainability aspects. This paper aims to identify various factors causing construction waste in Malaysia. Study was carried out through structured questionnaire focusing three major parties (i.e. clients, consultants and contractors)...

  13. Developing a Best-Evidence Pre-employment Medical Examination: An Example from the Construction Industry

    Directory of Open Access Journals (Sweden)

    Vincent Gouttebarge

    2014-09-01

    Full Text Available The Dutch construction industry has introduced a compulsory preemployment medical examination (PE-ME. Best-evidence contents related to specific job demands are, however, lacking and need to be gathered. After the identification of job demands and health problems in the construction industry (systematic literature search and expert meeting, specific job demands and related requirements were defined and instruments proposed. Finally, a work ability assessment was linked to the instruments' outcomes, resulting in the modular character of the developed PE-ME. Twenty-two specific job demands for all Dutch construction jobs were identified, including kneeling/squatting, working under time pressure, and exposure to hazardous substances. The next step was proposing self-report questions, screening questionnaires, clinical tests, and/or performance-based tests, leading to a work ability judgment. “Lifting/carrying” is described as an example. The new modular PE-ME enables a job-specific assessment of work ability to be made for more than 100 jobs in the Dutch construction industry.

  14. ENVIRONMENTAL SPECIFICATION REQUIREMENTS

    International Nuclear Information System (INIS)

    TIFFT, S.R.

    2003-01-01

    Through regulations, permitting or binding negotiations, Regulators establish requirements, limits, permit conditions and Notice of Construction (NOC) conditions with which the Office of River Protection (ORP) and the Tank Farm Contractor (TFC) must comply. Operating Specifications are technical limits which are set on a process to prevent injury to personnel, or damage to the facility or environment. The main purpose of this document is to provide specification limits and recovery actions for the TFC Environmental Surveillance Program at the Hanford Site. Specification limits are given for monitoring frequencies and permissible variation of readings from an established baseline or previous reading. The requirements in this document are driven by environmental considerations and data analysis issues, rather than facility design or personnel safety issues. This document is applicable to all single-shell tank (SST) and double-shell tank (DST) waste tanks, and the associated catch tanks and receiver tanks, and transfer systems. This Tank Farm Environmental Specifications Document (ESD) implements environmental-regulatory limits on the configuration and operation of the Hanford Tank Farms facility that have been established by Regulators. This ESD contains specific field operational limits and recovery actions for compliance with airborne effluent regulations and agreements, liquid effluents regulations and agreements, and environmental tank system requirements. The scope of this ESD is limited to conditions that have direct impact on Operations Projects or that Operations/Projects have direct impact upon. This document does not supercede or replace any DOE Orders, regulatory permits, notices of construction, or Regulatory agency agreements binding on the ORP or the TFC. Refer to the appropriate regulation, permit, or NOC for an inclusive listing of requirements

  15. Recycled aggregate in road construction following the Spanish General Technical Specifications for Roads and Bridge Works (PG-3: a case study

    Directory of Open Access Journals (Sweden)

    Martín-Morales, M.

    2013-03-01

    Full Text Available This research characterizes four samples of recycled aggregate for their potential use in road construction projects in consonance with the Spanish General Technical Specifications for Roads and Bridge Works (PG-3. Although some fractions were of sufficient quality for the construction of embankments, backfills, and quarry-run fills, they were ultimately found to be unsuitable for the construction of underground drainage, granular structural layers, soil stabilization and concrete pavements. They were negatively evaluated because of their particle size distribution and sulfate content. Nevertheless, the quality of this recycled aggregate could be substantially improved by manually removing the gypsum before the crushing process at the plant or by selecting the material with greater care at the beginning of the process. Finally, we suggest that Construction and Demolition (C&D waste plant managers should modify the manufacturing process to obtain a suitable particle size distribution in accordance with PG-3 requirements and the projected use of the aggregate.

    En esta investigación se han caracterizado cuatro muestras de árido reciclado para su potencial uso en obras de carreteras en España siguiendo el Pliego de Prescripciones Técnicas Generales para Obras de Carreteras y Puentes (PG-3. Aunque algunas fracciones presentaron suficiente calidad para la construcción de terraplenes, rellenos localizados y rellenos todo en uno, resultaron inadecuadas para la construcción de drenes subterráneos, zahorras, suelos estabilizados y pavimentos de hormigón. Obtuvieron una evaluación negativa en cuanto a distribución granulométrica y contenido en sulfatos. No obstante, la calidad de este árido reciclado podría mejorar sustancialmente eliminando manualmente el yeso antes de la trituración en planta o seleccionando el material con un mayor cuidado al inicio del proceso. Finalmente, recomendamos que los empresarios de las plantas de residuos

  16. Design Guide for Selection and Specification of Kevlar Rope for Ocean Engineering and Construction.

    Science.gov (United States)

    1976-07-01

    public rtoieco cnd sol . It i Idim .buttm Is ul"rnimi.. OCEAN ENGINEERING AND CONSTRUCTION PROJECT OFFICE CHESAPEAKE DIVISION NAVAL FACILITIES ENGINEERING...be to have no more than one layer. This is impractical for oceano - graphic purposes. Assuming a need to spooi many layers of rope under tension

  17. Construction quality assurance for Pit 6 landfill closure, Lawrence Livermore National Laboratory, Site 300

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-30

    Golder Construction Services, Inc. (GCS), under contract to the Regents of the University of California, Lawrence Livermore National Laboratory (LLNL), provided the construction quality assurance (CQA) observation and testing during the construction of the Site 300, Pit 6 landfill closure cover. The cap construction was performed as a CERCLA non-time-critical removal action from June 2 to August 29, 1997. the project site is located 18 miles east of Livermore on Tesla Road and approximately 10 miles southwest of Tracy on Corral Hollow Road in San Joaquin County, California. This report certifies that the LLNL, Site 300, Pit 6, Landfill Closure was constructed in accordance with the construction specifications and design drawings. This report documents construction activities and CQA monitoring and testing for construction of the Pit 6 Landfill Closure. Golder Associates, Inc. of Oakland, California was the design engineering firm responsible for preparation of the drawings and specifications. CQA services were provided by GCS, of Roseville, California, under supervision of a California registered civil Engineer.

  18. Base compaction specification feasibility analysis.

    Science.gov (United States)

    2012-12-01

    The objective of this research is to establish the technical engineering and cost : analysis concepts that will enable WisDOT management to objectively evaluate the : feasibility of switching construction specification philosophies for aggregate base...

  19. Construction and Development of a Cardiac Tissue-Specific and Hypoxia-Inducible Expression Vector

    Directory of Open Access Journals (Sweden)

    Shahrooz Ghaderi

    2018-03-01

    Full Text Available Purpose: Cardiovascular gene therapy is a sophisticated approach, thanks to the safety of vectors, stable transgene expression, delivery method, and different layers of the heart. To date, numerous expression vectors have been introduced in biotechnology and biopharmacy industries in relation to genetic manipulation. Despite the rapid growth of these modalities, they must be intelligently designed, addressing the cardiac-specific transgene expression and less side effects. Herein, we conducted a pilot project aiming to design a cardiac-specific hypoxia-inducible expression cassette. Methods: We explored a new approach to design an expression cassette containing cardiac specific enhancer, hypoxia response elements (HRE, cardiac specific promoter, internal ribosome entry site (IRES, and beta globin poly A sequence to elicit specific and inducible expression of the gene of interest. Enhanced green fluorescent protein (eGFP was sub-cloned by BglII and NotI into the cassette. The specificity and inducible expression of the cassette was determined in both mouse myoblast C2C12 and mammary glandular tumor 4T1 as ‘twin’ cells. eGFP expression was evaluated by immunofluorescence microscope and flow cytometry at 520 nm emission peak. Results: Our data revealed that the designed expression cassette provided tissue specific and hypoxia inducible (O2<1% transgene expression. Conclusion: It is suggested that cardiac-specific enhancer combined with cardiac-specific promoter are efficient for myoblast specific gene expression. As well, this is for the first time that HRE are derived from three well known hypoxia-regulated promoters. Therefore, there is no longer need to overlap PCR process for one repeated sequence just in one promoter.

  20. 46 CFR 160.023-3 - Materials, workmanship, construction, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... requirements. 160.023-3 Section 160.023-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand Combination... requirements. (a) The materials, construction, workmanship, general and detail requirements shall conform to...

  1. Genome-Wide Single-Nucleotide Polymorphisms Discovery and High-Density Genetic Map Construction in Cauliflower Using Specific-Locus Amplified Fragment Sequencing

    Science.gov (United States)

    Zhao, Zhenqing; Gu, Honghui; Sheng, Xiaoguang; Yu, Huifang; Wang, Jiansheng; Huang, Long; Wang, Dan

    2016-01-01

    Molecular markers and genetic maps play an important role in plant genomics and breeding studies. Cauliflower is an important and distinctive vegetable; however, very few molecular resources have been reported for this species. In this study, a novel, specific-locus amplified fragment (SLAF) sequencing strategy was employed for large-scale single nucleotide polymorphism (SNP) discovery and high-density genetic map construction in a double-haploid, segregating population of cauliflower. A total of 12.47 Gb raw data containing 77.92 M pair-end reads were obtained after processing and 6815 polymorphic SLAFs between the two parents were detected. The average sequencing depths reached 52.66-fold for the female parent and 49.35-fold for the male parent. Subsequently, these polymorphic SLAFs were used to genotype the population and further filtered based on several criteria to construct a genetic linkage map of cauliflower. Finally, 1776 high-quality SLAF markers, including 2741 SNPs, constituted the linkage map with average data integrity of 95.68%. The final map spanned a total genetic length of 890.01 cM with an average marker interval of 0.50 cM, and covered 364.9 Mb of the reference genome. The markers and genetic map developed in this study could provide an important foundation not only for comparative genomics studies within Brassica oleracea species but also for quantitative trait loci identification and molecular breeding of cauliflower. PMID:27047515

  2. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  3. Constructing the contemporary via digital cultural heritage

    DEFF Research Database (Denmark)

    Andreasen, Torsten Arni Caleb

    2015-01-01

    The present article questions the construction of 'the contemporary' in digital cultural heritage archives as specific strategic articulations between past and present with regard to the future. A historical exploration of the discourse of cultural heritage presents three strategic axes supposedly...... the possibility of ascribing inherent epistemological, existential, empirical and geopolitical force to a given technological archival order. - See more at: http://twentyfour.fibreculturejournal.org/2015/06/04/fcj-174-constructing-the-contemporary-via-digital-cultural-heritage/#sthash.sNhW8uuA.dpuf...

  4. ENVIRONMENTAL SPECIFICATION REQUIREMENTS

    International Nuclear Information System (INIS)

    TIFFT, S.R.

    2003-01-01

    Through regulations, permitting or binding negotiations, Regulators establish requirements, limits, permit conditions and Notice of Construction (NOC) conditions with which the Office of River Protection (ORP) and the Tank Farm Contractor (TFC) must comply. Operating Specifications are technical limits which are set on a process to prevent injury to personnel, or damage to the facility or environment. The main purpose of this document is to provide specification limits and recovery actions for the TFC Environmental Surveillance Program at the Hanford Site. Specification limits are given for monitoring frequencies and permissible variation of readings from an established baseline or previous reading. The requirements in this document are driven by environmental considerations and data analysis issues, rather than facility design or personnel safety issues. This document is applicable to all SST and DST waste tanks, and the associated catch tanks and receiver tanks, and transfer systems. This Tank Farm ESD implements environmental-regulatory limits on the configuration and operation of the Hanford Tank Farms facility that have been established by Regulators. This ESD contains specific field operational limits and recovery actions for compliance with airborne effluent regulations and agreements, liquid effluents regulations and agreements, and environmental tank system requirements. The scope of this ESD is limited to conditions that have direct impact on Operations/Projects or that Operations/Projects have direct impact upon. This document does not supercede or replace any DOE Orders, regulatory permits, notices of construction, or Regulatory agency agreements binding on the ORP or the TFC. Refer to the appropriate regulation, permit, or NOC for an inclusive listing of requirements

  5. Preliminary engineering specifications for a test demonstration multilayer protective barrier cover system

    International Nuclear Information System (INIS)

    Phillips, S.J.; Gilbert, T.W.; Adams, M.R.

    1985-03-01

    This report presents preliminary engineering specifications for a test protective barrier cover system and support radiohydrology facility to be constructed at the Hanford Protective Barrier Test Facility (PBTF). Construction of this test barrier and related radiohydrology facility is part of a continuing effort to provide construction experience and performance evaluation of alternative barrier designs used for long-term isolation of disposed radioactive waste materials. Design specifications given in this report are tentative, based on interim engineering and computer simulation design efforts. Final definitive design specifications and engineering prints will be produced in FY 1986. 6 refs., 10 figs., 1 tab

  6. Lunar concrete for construction

    Science.gov (United States)

    Cullingford, Hatice S.; Keller, M. Dean

    1988-01-01

    Feasibility of using concrete for lunar-base construction has been discussed recently without relevant data for the effects of vacuum on concrete. Experimental studies performed earlier at Los Alamos have shown that concrete is stable in vacuum with no deterioration of its quality as measured by the compressive strength. Various considerations of using concrete successfully on the moon are provided in this paper along with specific conclusions from the existing data base.

  7. Guidelines for preparing specifications for nuclear power plants (NCIG-04): Final report

    International Nuclear Information System (INIS)

    1988-04-01

    This document provides guidance for preparing technical requirements used in procurement and installation specifications. It is a compilation of recommend practices for writing specifications to preserve the best guidance coming out of recent years experience from construction of nuclear plants. It is intended to: Establish good practices for the content of specifications used for nuclear power plants; Be applicable to a wide range of specifications used for initial construction of plants and modifications to existing plants, including equipment replacement; and Provide guidance to specification preparers and reviewers

  8. Construction quality assurance report

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Construction Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project

  9. Arrangement and planning of developer’s activities in the course of construction megaprojects implementation

    Directory of Open Access Journals (Sweden)

    Orlov Alexandr K.

    2017-01-01

    Full Text Available The paper deals with the specific features of megaprojects. Problems related to real estate reproduction in the course of construction megaprojects implementation were analyzed. Considering the specifics of construction megaprojects, recommendations for their performance assessment were developed. Issues relating to development arrangement and planning at all management levels (strategic, tactical and operational were considered. Recommendations provided in this paper can be used for the assessment of megaproject performance and formation of KPIs for the participants of the construction process.

  10. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  11. Windchill-201 - Custom Soft-Type Construction

    Science.gov (United States)

    Jones, Corey; LaPha, Steven

    2013-01-01

    This presentation will explain Windchill soft-types-what they are, how they work, and how to construct custom ones, configured specifically for your system. The process and particulars of creating and implementing a WTDocument soft-type will be discussed, and the interaction between soft-types and Windchill objects will be shown.

  12. Regional approaches in high-rise construction

    Science.gov (United States)

    Iconopisceva, O. G.; Proskurin, G. A.

    2018-03-01

    The evolutionary process of high-rise construction is in the article focus. The aim of the study was to create a retrospective matrix reflecting the tasks of the study such as: structuring the most iconic high-rise objects within historic boundaries. The study is based on contemporary experience of high-rise construction in different countries. The main directions and regional specifics in the field of high-rise construction as well as factors influencing the further evolution process are analyzed. The main changes in architectural stylistics, form-building, constructive solutions that focus on the principles of energy efficiency and bio positivity of "sustainable buildings", as well as the search for a new typology are noted. The most universal constructive methods and solutions that turned out to be particularly popular are generalized. The new typology of high-rises and individual approach to urban context are noted. The results of the study as a graphical scheme made it possible to represent the whole high-rise evolution. The new spatial forms of high-rises lead them to new role within the urban environments. Futuristic hyperscalable concepts take the autonomous urban space functions itself and demonstrate us how high-rises can replace multifunctional urban fabric, developing it inside their shells.

  13. Needs Assessment--A Construction Management Bachelor of Science Degree in Alaska.

    Science.gov (United States)

    Gunderson, D. E.; Ra, J. W.; Schroeder, H.; Holland, H. R.

    2002-01-01

    Responses from 99 Alaskan contractors identified the number of entry-level construction management personnel needed, salaries, and desired skills. Skills identified will be used to develop a construction management curriculum specific to the Alaskan environment. Findings correlate with research predicting supply and demand for graduates nationwide…

  14. Perl Modules for Constructing Iterators

    Science.gov (United States)

    Tilmes, Curt

    2009-01-01

    The Iterator Perl Module provides a general-purpose framework for constructing iterator objects within Perl, and a standard API for interacting with those objects. Iterators are an object-oriented design pattern where a description of a series of values is used in a constructor. Subsequent queries can request values in that series. These Perl modules build on the standard Iterator framework and provide iterators for some other types of values. Iterator::DateTime constructs iterators from DateTime objects or Date::Parse descriptions and ICal/RFC 2445 style re-currence descriptions. It supports a variety of input parameters, including a start to the sequence, an end to the sequence, an Ical/RFC 2445 recurrence describing the frequency of the values in the series, and a format description that can refine the presentation manner of the DateTime. Iterator::String constructs iterators from string representations. This module is useful in contexts where the API consists of supplying a string and getting back an iterator where the specific iteration desired is opaque to the caller. It is of particular value to the Iterator::Hash module which provides nested iterations. Iterator::Hash constructs iterators from Perl hashes that can include multiple iterators. The constructed iterators will return all the permutations of the iterations of the hash by nested iteration of embedded iterators. A hash simply includes a set of keys mapped to values. It is a very common data structure used throughout Perl programming. The Iterator:: Hash module allows a hash to include strings defining iterators (parsed and dispatched with Iterator::String) that are used to construct an overall series of hash values.

  15. EM-50 Tanks Focus Area retrieval process development and enhancements. FY97 technology development summary report

    International Nuclear Information System (INIS)

    Rinker, M.W.; Bamberger, J.A.; Alberts, D.G.

    1997-09-01

    The Retrieval Process Development and Enhancements (RPD and E) activities are part of the US Department of Energy (DOE) EM-50 Tanks Focus Area, Retrieval and Closure program. The purpose of RPD and E is to understand retrieval processes, including emerging and existing technologies, and to gather data on these processes, so that end users have requisite technical bases to make retrieval decisions. Technologies addressed during FY97 include enhancements to sluicing, the use of pulsed air to assist mixing, mixer pumps, innovative mixing techniques, confined sluicing retrieval end effectors, borehole mining, light weight scarification, and testing of Russian-developed retrieval equipment. Furthermore, the Retrieval Analysis Tool was initiated to link retrieval processes with tank waste farms and tank geometric to assist end users by providing a consolidation of data and technical information that can be easily assessed. The main technical accomplishments are summarized under the following headings: Oak Ridge site-gunite and associated tanks treatability study; pulsed air mixing; Oak Ridge site-Old Hydrofracture Facility; hydraulic testbed relocation; cooling coil cleaning end effector; light weight scarifier; innovative tank mixing; advanced design mixer pump; enhanced sluicing; Russian retrieval equipment testing; retrieval data analysis and correlation; simulant development; and retrieval analysis tool (RAT)

  16. Joint optimization scheduling for water conservancy projects in complex river networks

    Directory of Open Access Journals (Sweden)

    Qin Liu

    2017-01-01

    Full Text Available In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.

  17. A model for the construction of country-specific, yet internationally comparable short-form marketing scales

    NARCIS (Netherlands)

    de Jong, Martijn G.; Steenkamp, Jan-Benedict E.M.; Veldkamp, Bernard P.

    2009-01-01

    In the last few decades, the measurement of marketing constructs has improved tremendously. Our discipline has also started to systematically catalogue our measurement knowledge in influential handbooks of marketing scales. However, at least two important issues remain. First, existing scales are

  18. Pathway index models for construction of patient-specific risk profiles.

    Science.gov (United States)

    Eng, Kevin H; Wang, Sijian; Bradley, William H; Rader, Janet S; Kendziorski, Christina

    2013-04-30

    Statistical methods for variable selection, prediction, and classification have proven extremely useful in moving personalized genomics medicine forward, in particular, leading to a number of genomic-based assays now in clinical use for predicting cancer recurrence. Although invaluable in individual cases, the information provided by these assays is limited. Most often, a patient is classified into one of very few groups (e.g., recur or not), limiting the potential for truly personalized treatment. Furthermore, although these assays provide information on which individuals are at most risk (e.g., those for which recurrence is predicted), they provide no information on the aberrant biological pathways that give rise to the increased risk. We have developed an approach to address these limitations. The approach models a time-to-event outcome as a function of known biological pathways, identifies important genomic aberrations, and provides pathway-based patient-specific assessments of risk. As we demonstrate in a study of ovarian cancer from The Cancer Genome Atlas project, the patient-specific risk profiles are powerful and efficient characterizations useful in addressing a number of questions related to identifying informative patient subtypes and predicting survival. Copyright © 2012 John Wiley & Sons, Ltd.

  19. Excavation of shafts and research galleries at the Mizunami Underground Research Laboratory. Construction work of MIU part 4. Construction progress report, fiscal year 2010-2011

    International Nuclear Information System (INIS)

    2014-11-01

    This progress report presents an outline compilation of construction activities, primary tasks performed, construction progress and safety patrol report, in fiscal year 2010-2011. The outline of construction activities is a summary based on the scope of work planned in 2010-2011: the main activities are based on the Tono Geoscience Center weekly reports; and the construction progress is based on the planned and actual schedules. The safety patrol report is based on defects recording by the safety manager of the Geoscience Facility Construction Section. Regarding the plan and actual performance of the construction work of MIU part IV (March 16, 2010 - March 15, 2012) performance carried out from April 1, 2010 until March 15, 2012 is described in this report. The attached appendices have been provided: regarding content in the excavated material bellowing the environmental standards, technical specifications of fiscal year 2010-2011 in construction work of MIU part IV, also photos of construction activities. (author)

  20. work specification for the construction of 33kv overhead lines across

    African Journals Online (AJOL)

    HOD

    obtained using the standard mathematical equations and the specifications for Aluminium Conductor Steel Reinforce ... systems. The choice of conductor depends on the cost and efficiency. ... Support structure requirements, limitations.

  1. Advanced Construction of Compact Containment BWR

    International Nuclear Information System (INIS)

    Takahashi, M.; Maruyama, T.; Mori, H.; Hoshino, K.; Hijioka, Y.; Heki, H.; Nakamaru, M.; Hoshi, T.

    2006-01-01

    fabricate and perform pressure-test at the factory and transport to the construction-site as a module. Basing on CCR design concept of simplification and compact, reactor building layout design has been carried out. Layout design has been performed taking into account module construction, reduced system and components and compact PCV. As a result, CCR's reactor building, specific volume to power output value is almost equal to ABWR one. Module fabrication and construction method is promising technology from the points of construction duration shortening and construction cost reduction. Electrical equipment are piled up to multi-layer and connected and tested at the factory and transported to the construction-site in one module. Other equipment rooms and areas are also built into the various pre-fabricated module types in CCR construction. The construction of the CCR by the large module is planned to achieve only 24-month construction period from bedrock inspection to commercial operation. The CCR has possibilities of attaining both economical and safe small reactor by simplified system and compact PCV technologies with advanced construction. (authors)

  2. Construction work of superstructure of twin harp bridge. Twin harp kyo jobuko no seko

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, H.; Sato, Y.; Kanazawa, Y. (Sumitomo Construction Kajima Corp. Dopy Construction Co. Ltd. Nihon Koatsu Concrete Co. Ltd. Joint Venture, Tokyo (Japan)); Sema, M. (Sumitomo Construction Co. Ltd., Tokyo (Japan))

    1991-11-30

    Construction plan outline of PC cable stayed bridge with main tower having one pillar structure is introduced and this is the first type of bridge in Japan with three continuous span design. Construction was commenced on 7 July, 1989 and was completed on 8 August, 1991 at south east of Ashahikawa, Hokkaido. Construction outline is consisted of Principal specifications, general layout of structure, construction order and overall stage of the construction work. Main tower is described by its outline, jump system, installation of diagonal member anchorage device, formwork and concrete structure, and cross beam construction has included four parts which are outline, capital part, projected part construction, lateral span and closure part, and central control span and closure part. Outline, cable guard and erection work, cable work, work Procedure of cable taut construction using total taut method, tension adjustment of cable and grouting, for diagonal member are explained. The construction control items specific to cable stayed bridge are diagonal member tension control( control of applied tension, change of tension with time and test taut ) and camber control. Practical vibration test was carried out on March, 1991. 8 refs., 15 figs., 5 tabs.

  3. Law-Based Ontology for E-Government Services Construction - Case Study: The Specification of Services in Relationship with the Venture Creation in Switzerland

    Science.gov (United States)

    Khadraoui, Abdelaziz; Opprecht, Wanda; Léonard, Michel; Aïdonidis, Christine

    The compliance of e-government services with legal aspects is a crucial issue for administrations. This issue becomes more difficult with the fast-evolving dynamics of laws. This chapter presents our approach to describe and establish the link between e-government services and legal sources. This link is established by an ontology called “law-based ontology.” We use this ontology as means to define and to construct e-government services. The proposed approach is illustrated with one case study: the specification of services in relationship with the venture ­creation in Switzerland and in the State of Geneva. We have selected the Commercial Register area which mainly encompasses the registration of a new company and the modification of its registration.

  4. Study on construction technology for repository

    International Nuclear Information System (INIS)

    Tanai, Kenji; Iwasa, Kengo; Hasegawa, Hiroshi; Miura, Kazuhiko; Okutsu, Kazuo; Kobayashi, Masaaki

    1999-11-01

    established and integrated through the construction of an underground research laboratory and of engineering technologies that are currently in the planning stages. Once a site is selected, an optimized integrated construction system suitable to the detailed geological environment conditions and the specification of each tunnel (shape, dimensions) will be selected. (author)

  5. Improving occupational health care for construction workers: a process evaluation

    NARCIS (Netherlands)

    Boschman, Julitta S.; van der Molen, Henk F.; Sluiter, Judith K.; Frings-Dresen, Monique H. W.

    2013-01-01

    To evaluate the process of a job-specific workers' health surveillance (WHS) in improving occupational health care for construction workers. From January to July 2012 were 899 bricklayers and supervisors invited for the job-specific WHS at three locations of one occupational health service

  6. Quality in Construction- A Supply Chain Perspective

    DEFF Research Database (Denmark)

    Koch, Christian; Larsen, Casper Schultz

    2006-01-01

    be demonstrated by studying the emergence of failures occurring in the supply chain. The paper conceptualises the construction supply as a delivery network being partially stable, partially project specific and configured. It moreover develops a frame of understanding of the handling of quality issues...... in the delivery network, using operation management approaches. The paper presents case study work done in Danish construction. The method was observation of work at the construction site followed by interviews with actors backwards upstream the supply chain to the origin of the failure. The building project...... into the material stream. The paper proposes initiatives to strengthen partnerships in supply chains, especially at mixed stable and project configured types. The contradiction between permanent enterprise organisations potentially capable of handling purchasing and the role of the project manager is discussed...

  7. Trait-specific dependence in romantic relationships.

    Science.gov (United States)

    Ellis, Bruce J; Simpson, Jeffry A; Campbell, Lorne

    2002-10-01

    Informed by three theoretical frameworks--trait psychology, evolutionary psychology, and interdependence theory--we report four investigations designed to develop and test the reliability and validity of a new construct and accompanying multiscale inventory, the Trait-Specific Dependence Inventory (TSDI). The TSDI assesses comparisons between present and alternative romantic partners on major dimensions of mate value. In Study 1, principal components analyses revealed that the provisional pool of theory-generated TSDI items were represented by six factors: Agreeable/Committed, Resource Accruing Potential, Physical Prowess, Emotional Stability, Surgency, and Physical Attractiveness. In Study 2, confirmatory factor analysis replicated these results on a different sample and tested how well different structural models fit the data. Study 3 provided evidence for the convergent and discriminant validity of the six TSDI scales by correlating each one with a matched personality trait scale that did not explicitly incorporate comparisons between partners. Study 4 provided further validation evidence, revealing that the six TSDI scales successfully predicted three relationship outcome measures--love, time investment, and anger/upset--above and beyond matched sets of traditional personality trait measures. These results suggest that the TSDI is a reliable, valid, and unique construct that represents a new trait-specific method of assessing dependence in romantic relationships. The construct of trait-specific dependence is introduced and linked with other theories of mate value.

  8. Construction monitoring constraints and challenges:A feasibility study

    OpenAIRE

    Fidler, Paul; Vardanega, Paul J; Long, Peter; Webb, Graham; Stehle, John; Middleton, Campbell

    2013-01-01

    This paper presents a study of the constraints and challenges faced by the authors when invited to study the feasibility of developing a monitoring system to provide specific information sought by the designer and contractor during the construction of the new 225m high, 48 storey steel-framed Leadenhall Building, located at 122 Leadenhall Street in London. The original goal of the study was to develop a system to assist with the active alignment of the building during construction, a key aim ...

  9. Practical aspects on a Marx generator construction

    International Nuclear Information System (INIS)

    Diniz, R.; Sudano, J.P.

    1991-01-01

    The practical aspects of Marx generator construction has been studied. The problems and the ways to solve them are related, once the tests with the Marx generator will continue until the specification with the 16 capacitors. (L.C.J.A.). 7 refs, 6 figs

  10. Final Empirical Test Case Specification

    DEFF Research Database (Denmark)

    Kalyanova, Olena; Heiselberg, Per

    This document includes the empirical specification on the IEA task of evaluation building energy simulation computer programs for the Double Skin Facades (DSF) constructions. There are two approaches involved into this procedure, one is the comparative approach and another is the empirical one....

  11. SEARCH FOR WORKERS AS SYMBOLIC CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Sergey Yurevich Alasheev

    2013-08-01

    Full Text Available The labour market is seen as a field of symbolic exchange where the main actors are employers and job applicants, whereas the objects of exchange are workplaces and professional competence of employees. The analysis is based on the observed behavioural practices and verbal expressions. An attempt has been made to consider the area of interaction between employers and jobseekers as a field of symbolic production and consumption and to describe methods of construction and perception of representations in the labour market. The analysis of several interviews has revealed significant characteristics of the image of an employee, the employer’s expectations and the specificity of perception of a job applicant.Search and recruitment is a communication process which forms an image of the profession. The use of various search channels imposes restrictions on the construction of the image of a required worker by the employer and determines the specificity of perception of the vacancy by job applicants.DOI: http://dx.doi.org/10.12731/2218-7405-2013-7-3

  12. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  13. A radical construction grammar perspective on the modal particle-discourse particle distinction

    DEFF Research Database (Denmark)

    Fischer, Kerstin; Alm, Maria

    2013-01-01

    between the contributions of lexical and grammatical constructions. In accordance with Croft’s (2001) Radical Construction Grammar approach, cross-linguistic comparison is then carried out on the basis of the conceptual space, which comprises the language specific sets of functions discourse and modal...

  14. Engineering study for ISSTRS design concept

    Energy Technology Data Exchange (ETDEWEB)

    Hertzel, J.S.

    1997-01-31

    Los Alamos Technical Associates, Inc., is pleased to transmit the attached Conceptual Design Package for the Initial Single Shell Tank Retrieval System (ISSTRS), 90% Conceptual Design Review. The package includes the following: (1) ISSTRS Trade Studies: (a) Retrieval Facility Cooling Requirements; (b) Equipment Re-usability between Project W-320 and Tanks 241-C-103 and 241-C-1 05; (c) Sluice Line Options; and (d) Options for the Location of Tanks AX-103 and A-1 02 HVAC Equipment; (2) Drawings; (3) Risk Management Plan; (4) 0850 Interface Control Document; (5) Requirements Traceability Report; and (6) Project Design Specification.

  15. Construct validity in Operations Management by using Rasch Measurement Theory. The case of the construct “motivation to implement continuous improvement"

    Directory of Open Access Journals (Sweden)

    Lidia Sanchez-Ruiz

    2016-12-01

    Full Text Available Construct design and validation is a common practise in the Operations Management field. In this sense, the aim of this study is to present Rasch Measurement Theory (RMT as richful and useful methodology in order to validate constructs. In order to do so, the measurement controversy in the social science is presented; then, RMT is explained as a solution for this measurement issue; after that, the different applications of RMT are described and, finally, the different stages of the validation process are presented. Thus, this work aims to serve as a guide for those researchers interested in the methodology. Therefore, a specific case is included: the validation of the construct “motivation to implement continuous improvement”.

  16. A construct with fluorescent indicators for conditional expression of miRNA

    Directory of Open Access Journals (Sweden)

    Xia Xugang

    2008-10-01

    Full Text Available Abstract Background Transgenic RNAi holds promise as a simple, low-cost, and fast method for reverse genetics in mammals. It may be particularly useful for producing animal models for hypomorphic gene function. Inducible RNAi that permits spatially and temporally controllable gene silencing in vivo will enhance the power of transgenic RNAi approach. Furthermore, because microRNA (miRNA targeting specific genes can be expressed simultaneously with protein coding genes, incorporation of fluorescent marker proteins can simplify the screening and analysis of transgenic RNAi animals. Results We sought to optimally express a miRNA simultaneously with a fluorescent marker. We compared two construct designs. One expressed a red fluorescent protein (RFP and a miRNA placed in its 3' untranslated region (UTR. The other expressed the same RFP and miRNA, but the precursor miRNA (pre-miRNA coding sequence was placed in an intron that was inserted into the 3'-UTR. We found that the two constructs expressed comparable levels of miRNA. However, the intron-containing construct expressed a significantly higher level of RFP than the intron-less construct. Further experiments indicate that the 3'-UTR intron enhances RFP expression by its intrinsic gene-expression-enhancing activity and by eliminating the inhibitory effect of the pre-miRNA on the expression of RFP. Based on these findings, we incorporated the intron-embedded pre-miRNA design into a conditional expression construct that employed the Cre-loxP system. This construct initially expressed EGFP gene, which was flanked by loxP sites. After exposure to Cre recombinase, the transgene stopped EGFP expression and began expression of RFP and a miRNA, which silenced the expression of specific cellular genes. Conclusion We have designed and tested a conditional miRNA-expression construct and showed that this construct expresses both the marker genes strongly and can silence the target gene efficiently upon Cre

  17. Constructing the popular: challenges of archiving ugandan 'popular ...

    African Journals Online (AJOL)

    Constructing the popular: challenges of archiving ugandan 'popular' music. ... on the intention of the one defining, the popular is also time- and culture-specific. ... in Uganda is commercially determined – by the media and the music industry.

  18. Aggression-related alcohol expectancies and barroom aggression among construction tradespeople.

    Science.gov (United States)

    Zinkiewicz, Lucy; Smith, Georgia; Burn, Michele; Litherland, Steven; Wells, Samantha; Graham, Kathryn; Miller, Peter

    2016-09-01

    Few studies have investigated the relationship of barroom aggression with both general and barroom-specific alcohol expectancies. The present study investigated these associations in a rarely studied and high-risk population: construction tradespeople. Male construction tradespeople (n = 211) aged 18-35 years (M = 21.91, SD = 4.08 years) participated in a face-to-face questionnaire assessing general and barroom-specific alcohol expectancies and perpetration of physical and verbal barroom aggression as well as control variables, age, alcohol consumption and trait aggression. Sequential logistic regression analyses revealed that general alcohol-aggression expectancies of courage or dominance were not predictive of either verbal or physical barroom aggression after controlling for age, alcohol consumption and trait aggression. However, barroom-specific alcohol expectancies were associated with both verbal and physical barroom aggression, with positive associations found for expected hyper-emotionality and protective effects for expected cognitive impairment. In a population where rates of risky drinking and barroom aggression are high, specific expectations about the effects of drinking in bars may influence subsequent aggressive behaviour in bars. [Zinkiewicz L, Smith G, Burn M, Litherland S, Wells S, Graham K, Miller P. Aggression-related alcohol expectancies and barroom aggression among construction tradespeople. Drug Alcohol Rev 2016;35:549-556]. © 2015 Australasian Professional Society on Alcohol and other Drugs.

  19. Construction of an SNP-based high-density linkage map for flax (Linum usitatissimum L.) using specific length amplified fragment sequencing (SLAF-seq) technology.

    Science.gov (United States)

    Yi, Liuxi; Gao, Fengyun; Siqin, Bateer; Zhou, Yu; Li, Qiang; Zhao, Xiaoqing; Jia, Xiaoyun; Zhang, Hui

    2017-01-01

    Flax is an important crop for oil and fiber, however, no high-density genetic maps have been reported for this species. Specific length amplified fragment sequencing (SLAF-seq) is a high-resolution strategy for large scale de novo discovery and genotyping of single nucleotide polymorphisms. In this study, SLAF-seq was employed to develop SNP markers in an F2 population to construct a high-density genetic map for flax. In total, 196.29 million paired-end reads were obtained. The average sequencing depth was 25.08 in male parent, 32.17 in the female parent, and 9.64 in each F2 progeny. In total, 389,288 polymorphic SLAFs were detected, from which 260,380 polymorphic SNPs were developed. After filtering, 4,638 SNPs were found suitable for genetic map construction. The final genetic map included 4,145 SNP markers on 15 linkage groups and was 2,632.94 cM in length, with an average distance of 0.64 cM between adjacent markers. To our knowledge, this map is the densest SNP-based genetic map for flax. The SNP markers and genetic map reported in here will serve as a foundation for the fine mapping of quantitative trait loci (QTLs), map-based gene cloning and marker assisted selection (MAS) for flax.

  20. The construction and testing of the EORTC colorectal cancer-specific quality of life questionnaire module (QLQ-CR38). European Organization for Research and Treatment of Cancer Study Group on Quality of Life

    NARCIS (Netherlands)

    Sprangers, M. A.; te Velde, A.; Aaronson, N. K.

    1999-01-01

    The objectives of the current study were to construct a colorectal cancer-specific quality of life (QL) questionnaire module to be used in conjunction with the European Organization for Research and Treatment of Cancer (EORTC) QLQ-C30 and to test its reliability and validity in The Netherlands.

  1. Knowledge-Based Decision Model Construction for Dynamic Interpretation Tasks

    National Research Council Canada - National Science Library

    Wellman, Michael

    1997-01-01

    ...) is highly variable, precluding specification of a fixed model in advance. The project yielded technical results in four areas of reasoning and decision making under uncertainty involving model construction: (1...

  2. The Construction of Macro-events. A typological perspective

    DEFF Research Database (Denmark)

    Pedersen, Johan

    2009-01-01

    languages. The discussion originates in a contrastive analysis of a short story by H. C. Andersen available in six parallel versions: the original Danish version, an English, a German, a Spanish, an Italian and a French version. The paper argues that the generalized version of the typology (Talmy 1991, 2000....... Constructions of the main information (MIC) and the supportive information (SIC), of varying degree of specificity, are the basic constituents of the typology. From this point of view, Germanic languages tend to map the main information (MI) onto a complex schematic construction and the supportive information...... (SI) onto a lexical (verbal) construction. Romance languages tend to map the MI onto the verb, while the SI may be mapped onto a complex schematic construction. The paper hypothesizes that MIC and SIC stem from generalizations from usage, that they have their own, procedural role in grammar...

  3. Niche construction, sources of selection and trait coevolution.

    Science.gov (United States)

    Laland, Kevin; Odling-Smee, John; Endler, John

    2017-10-06

    Organisms modify and choose components of their local environments. This 'niche construction' can alter ecological processes, modify natural selection and contribute to inheritance through ecological legacies. Here, we propose that niche construction initiates and modifies the selection directly affecting the constructor, and on other species, in an orderly, directed and sustained manner. By dependably generating specific environmental states, niche construction co-directs adaptive evolution by imposing a consistent statistical bias on selection. We illustrate how niche construction can generate this evolutionary bias by comparing it with artificial selection. We suggest that it occupies the middle ground between artificial and natural selection. We show how the perspective leads to testable predictions related to: (i) reduced variance in measures of responses to natural selection in the wild; (ii) multiple trait coevolution, including the evolution of sequences of traits and patterns of parallel evolution; and (iii) a positive association between niche construction and biodiversity. More generally, we submit that evolutionary biology would benefit from greater attention to the diverse properties of all sources of selection.

  4. Construction history and construction management

    International Nuclear Information System (INIS)

    Agh, S.

    1999-01-01

    The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)

  5. The Significance of Barriers to Entry in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Gerard de Valence

    2012-11-01

    Full Text Available This research looks at the significance of barriers that firms considering entry into the construction industry might face. Drawing on the microeconomic characteristics of imperfectly competitive and oligopolistic markets the analysis finds that there are a dozen barriers to entry that affect the industry, but their significance depends on the product type. The discussion covers the question of product homogeneity in construction and evidence for the existence of barriers to entry in concentration levels. Barriers to entry specific to construction are then identified, which leads to an analysis of how they operate and their significance (high, medium or low in different market types, thus increasing our understanding of construction industry dynamics.

  6. Wesleyan (AntiFeminism: A Religious Construction of Gender Equality

    Directory of Open Access Journals (Sweden)

    Lisa Weaver Swartz

    2018-03-01

    Full Text Available Using ethnographic research and interviews, this article explored the construction of gender equality among students and faculty members at the Asbury Theological Seminary. The institution constructed an unusual blend of egalitarianism and anti-feminism using explicitly religious tools. Specifically, it was found that community members constructed firm commitments to gender equality from their heavily individualistic theology and from identification with the New Testament Church. The community’s resonance with feminism was also limited by evangelical anti-structuralism and an ethic of Christian humility and moderation. Established constructions of gender equality and inequality in established scholarly, and especially feminist, literature could not fully explain this unusual blend. This paper argues that agency and empowerment can be available to women because of the theological content of their religion.

  7. Constructing Aligned Assessments Using Automated Test Construction

    Science.gov (United States)

    Porter, Andrew; Polikoff, Morgan S.; Barghaus, Katherine M.; Yang, Rui

    2013-01-01

    We describe an innovative automated test construction algorithm for building aligned achievement tests. By incorporating the algorithm into the test construction process, along with other test construction procedures for building reliable and unbiased assessments, the result is much more valid tests than result from current test construction…

  8. Construction experience on PCRV liners at Fort St. Vrain

    International Nuclear Information System (INIS)

    Cliff, J.O.; Wunderlich, R.G.

    1976-01-01

    The construction of the steel liners for the Fort St. Vrain prestressed concrete reactor vessel presented many unique problems for which techniques were developed to satisfy the rigid specification requirements. The PCRV cavity liner was fabricated from 1.9cm carbon steel plate. The liners were partially fabricated by Pittsburgh-Des Moines Steel Company at their Pittsburgh manufacturing facility. The liners were then shipped by rail to within approximately five miles of the jobsite and then trucked the remaining distance. The construction techniques, dimensional control, concrete support and testing utilized on the Fort St. Vrain project are presented in detail and demonstrate the flexibility of the PCRV for field construction. (author)

  9. Three integrated photovoltaic/sound barrier power plants. Construction and operational experience

    International Nuclear Information System (INIS)

    Nordmann, T.; Froelich, A.; Clavadetscher, L.

    2002-01-01

    After an international ideas competition by TNC Switzerland and Germany in 1996, six companies where given the opportunity to construct a prototype of their newly developed integrated PV-sound barrier concepts. The main goal was to develop highly integrated concepts, allowing the reduction of PV sound barrier systems costs, as well as the demonstration of specific concepts for different noise situations. This project is strongly correlated with a German project. Three of the concepts of the competition are demonstrated along a highway near Munich, constructed in 1997. The three Swiss installations had to be constructed at different locations, reflecting three typical situations for sound barriers. The first Swiss installation was the world first Bi-facial PV-sound barrier. It was built on a highway bridge at Wallisellen-Aubrugg in 1997. The operational experience of the installation is positive. But due to the different efficiencies of the two cell sides, its specific yield lies somewhat behind a conventional PV installation. The second Swiss plant was finished in autumn 1998. The 'zig-zag' construction is situated along the railway line at Wallisellen in a densely inhabited area with some local shadowing. Its performance and its specific yield is comparatively low due to a combination of several reasons (geometry of the concept, inverter, high module temperature, local shadows). The third installation was constructed along the motor way A1 at Bruettisellen in 1999. Its vertical panels are equipped with amorphous modules. The report show, that the performance of the system is reasonable, but the mechanical construction has to be improved. A small trial field with cells directly laminated onto the steel panel, also installed at Bruettisellen, could be the key development for this concept. This final report includes the evaluation and comparison of the monitored data in the past 24 months of operation. (author)

  10. Description of the semantic potential of the si-construction in Basse ...

    African Journals Online (AJOL)

    He notes, however, that this future meaning may be modified by means of certain words which accompany the construction. Specifically, when the si-construction is employed with the particle fo, it results in an obligatory meaning. Consider, for example, Fo n si a kanu "I should love him" (Macbrair 1842:20). Likewise, with the ...

  11. New developments in nuclear power plant construction

    International Nuclear Information System (INIS)

    Bivens, A.C.

    1983-01-01

    Specific examples of construction activities are presented which demonstrate that excellent results have been achieved in the areas of cost, schedule and quality. Examples of innovation and development are given that would be particularly applicable to future work either for new plants or for plants not yet completed. (author)

  12. Potential of sustainable energy with regard to engineering structures. WINN Energy from Water; Energieverbruik nationaal en regionaal waterbeheer. WINN Energie uit Water

    Energy Technology Data Exchange (ETDEWEB)

    Dahm, R.; Bruggers, M. [Deltares, Delft (Netherlands)

    2009-12-15

    An overview is offered of the annual energy use of pumping stations, weirs and sluices in the Netherlands. This involves both the energy use of wet objects (pumping stations, weirs and sluices) in the main water system and the regional water systems. The reports has an annex containing the report 'Inventarisatie energieverbruik waterwerken' (Inventory of energy use by water works) published by Grontmij Netherlands [Dutch] Een overzicht wordt gegeven van het jaarlijkse energieverbruik door gemalen, stuwen en sluizen in Nederland. Het gaat daarbij zowel om het energieverbruik van de natte objecten (gemalen, stuwen en sluizen) in het hoofdwatersysteem als om de regionale watersystemen. Het rapport bevat als bijlage het rapport 'Inventarisatie energieverbruik waterwerken' door Grontmij Nederland.

  13. A selective study of Information technologies to improve operations efficiency in construction

    Directory of Open Access Journals (Sweden)

    Konikov Alexandr

    2018-01-01

    Full Text Available Today, information technologies (IT are used in almost every production industry. While the aspects of IT are well studied and discussed in relevant monographs, articles, web sources, etc., this paper reviews the performance improvement options in the construction industry by leveraging IT. From a wide range of information technologies the author has picked the most relevant solutions, from his point of view, based on several considerations, the most important one being the lack of adequate attention to these technologies specifically in the construction industry. The paper covers the following technologies: Big Data (a smart technology for high-speed processing of huge and diverse data arrays; situation centers (SC for construction and operations projects (SCs are successfully used in other industries for operating control of sophisticated facilities; data warehouses (DW for the construction industry (DWs are viewed as a standalone project rather than a supplement to Data Mining or Big Data; operational and dispatch radio communication service (radio communication can ensure instant connectivity between several subscribers; VSAT (a satellite technology for prompt connection of a distant construction site with the 'outer world' when no alternatives are available. The paper briefly presents the essence of each technology, describes the pre-requisites for its use in construction, outlines the key advantages, limits and shortcomings, and lists construction projects where it shall be worthwhile to use a specific technology projects.

  14. Principles for the formation of an effective concept of multifunctional high-rise construction investment projects

    Directory of Open Access Journals (Sweden)

    Beliakov Sergei

    2018-01-01

    Full Text Available Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.

  15. Principles for the formation of an effective concept of multifunctional high-rise construction investment projects

    Science.gov (United States)

    Beliakov, Sergei

    2018-03-01

    Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.

  16. Construction Management of Electromechanical Engineering Project in Petrochemical Construction

    Directory of Open Access Journals (Sweden)

    Xi Tao

    2017-03-01

    Full Text Available Petrochemical industry as a basic industry, occupies a pivotal position in the national economy, with the continuous development of science and technology, electromechanical automation in the petrochemical industry has been widely used to save a lot of labor but also greatly improve the oil Chemical industry production efficiency. Therefore, in the construction of petrochemical industry, mechanical and electrical engineering as part of it. It plays a vital role. Petrochemical industry with the production of high temperature and high pressure and flammable and explosive gas, can strengthen the construction of mechanical and electrical engineering specialization and construction management of scientific, has become the relationship between the smooth development of mechanical and electrical engineering and engineering quality of the key, A direct impact on the petrochemical construction of the overall construction quality. To this end, it is necessary for the construction of petrochemical construction of electromechanical engineering construction management to promote the construction of mechanical and electrical engineering management level gradually increased. This article on the machine Electric engineering project construction management were discussed with a view to the petrochemical construction in the relevant aspects of the need to provide reference for reference.

  17. A Time to Define: Making the Specific Learning Disability Definition Prescribe Specific Learning Disability

    Science.gov (United States)

    Kavale, Kenneth A.; Spaulding, Lucinda S.; Beam, Andrea P.

    2009-01-01

    Unlike other special education categories defined in U.S. law (Individuals with Disabilities Education Act), the definition of specific learning disability (SLD) has not changed since first proposed in 1968. Thus, although the operational definition of SLD has responded to new knowledge and understanding about the construct, the formal definition…

  18. Developing a strategic perspective for construction industry of Botswana

    Directory of Open Access Journals (Sweden)

    Joseph Ssegawa

    2013-09-01

    Full Text Available 800x600 The paper discusses the outcome of a study conducted to formulate the strategic perspective of the construction industry in Botswana. The study was sanctioned by the two influential entities namely the Ministry of Infrastructure and BOCCIM Construction Sector. The two entities not only represent the demand and supply side of the construction industry but also represent key professions, trades and interests of the industry. A focus group approach was used based on workshops to formulate the strategic perspective. Workshop participants were drawn from various organisations that play a role in the delivery of construction projects. Individually they also represented the various professions, trades, occupations and interests relating to the construction processes in Botswana. Specific statements for industry’s vision, mission, values and goals were formulated through constructive discussions and debates to describe the future desired state of the construction industry. These are to serve as guiding tools for the industry’s reform process. The paper provides a step by step approach that integrates several scholastic frameworks for developing a strategic perspective for the industry. Normal 0 false false false EN-GB X-NONE X-NONE

  19. 77 FR 29537 - Standards and Specifications for Timber Products Acceptable for Use by Rural Utilities Service...

    Science.gov (United States)

    2012-05-18

    ... Construction, by codifying specifications for wood poles, stubs and anchor logs, wood crossarms (solid and.... The Agency also updated these specifications to conform with revisions to the American Wood Preservers... amended as follows: PART 1728--ELECTRIC STANDARDS AND SPECIFICATIONS FOR MATERIALS AND CONSTRUCTION 0 1...

  20. Performance-based specifications for temporary erosion and sediment control during construction : a survey of state practice.

    Science.gov (United States)

    2013-03-01

    During construction projects, surrounding soils can be disrupted, causing ecological damage through topsoil erosion and pollution of waterways with sediment. MnDOT currently has requirements and inspection procedures to ensure that contractors take m...

  1. Research on construction quality and improvement of assembly construction

    Science.gov (United States)

    Cheng, Fei

    2017-11-01

    Based on the acceleration of the urbanization process and the improvement of the quality of life of our residents, the demand for building construction has been increasing. In this context, the construction industry in order to promote the construction efficiency, quality improvement, to meet the needs of the development of the times to strengthen the new technology, the use of new technologies. At present, China’s engineering construction units in the process of carrying out the project to strengthen the use of assembly-type construction technology, which thus achieved for the traditional construction work low-level, high time-consuming issues, and promote the steady improvement of production efficiency. Based on this, this paper focuses on the analysis of the connotation of the assembly structure and analyzes the quality problems in the construction process of the construction projects and puts forward the improvement measures to promote the improvement of the building quality and the construction of the building Construction speed. Based on this, this paper analyzes the structural system and design of prefabricated building.

  2. Regulatory analysis for the use of underground barriers at the Hanford Site tank farms

    International Nuclear Information System (INIS)

    Hampsten, K.L.

    1994-01-01

    Sixty-seven of the single-shell tanks at the Hanford Site, Richland, Washington, are assumed to have leaked in the past. Some of the waste retrieval options being considered, such as past-practice sluicing (a process that uses hot water to dislodge waste for subsequent removal by pumping), have the potential for increasing releases of dangerous waste from these tanks. Underground barrier systems are being evaluated as a method to mitigate releases of tank waste to the soil and groundwater that may occur during retrieval activities. The following underground barrier system options are among those being evaluated to determine whether their construction at the Single-Shell Tank Farms is viable. (1) A desiccant barrier would be created by circulating air through the subsurface soil to lower and then maintain the water saturation below the levels required for liquids to flow. (2) An injected materials barrier would be created by injecting materials such as grout or silica into the subsurface soils to form a barrier around and under a given tank or tank farm. (3) A cryogenic barrier would be created by freezing subsurface soils in the vicinity of a tank or tank farm. An analysis is provided of the major regulatory requirements that may impact full scale construction and operation of an underground barrier system and a discussion of factors that should be considered throughout the barrier selection process, irrespective of the type of underground barrier system being considered. However, specific barrier systems will be identified when a given regulation will have significant impact on a particular type of barrier technology. Appendix A provides a matrix of requirements applicable to construction and operation of an underground barrier system

  3. BIM-Integrated Construction Operation Simulation for Just-In-Time Production Management

    Directory of Open Access Journals (Sweden)

    WoonSeong Jeong

    2016-10-01

    Full Text Available Traditional construction planning, which depends on historical data and heuristic modification, prevents the integration of managerial details such as productivity dynamics. Specifically, the distance between planning and execution brings cost overruns and duration extensions. To minimize variations, this research presents a Building Information Modeling (BIM-integrated simulation framework for predicting productivity dynamics at the construction planning phase. To develop this framework, we examined critical factors affecting productivity at the operational level, and then forecast the productivity dynamics. The resulting plan includes specific commands for retrieving the required information from BIM and executing operation simulations. It consists of the following steps: (1 preparing a BIM model to produce input data; (2 composing a construction simulation at the operational level; and (3 obtaining productivity dynamics from the BIM-integrated simulation. To validate our framework, we applied it to a structural steel model; this was due to the significance of steel erections. By integrating BIM with construction operation simulations, we were able to create reliable construction plans that adapted to project changes. Our results show that the developed framework facilitates the reliable prediction of productivity dynamics, and can contribute to improved schedule reliability, optimized resource allocation, cost savings associated with buffers, and reduced material waste.

  4. Microgripper construction kit

    Science.gov (United States)

    Gengenbach, Ulrich K.; Hofmann, Andreas; Engelhardt, Friedhelm; Scharnowell, Rudolf; Koehler, Bernd

    2001-10-01

    A large number of microgrippers has been developed in industry and academia. Although the importance of hybrid integration techniques and hence the demand for assembly tools grows continuously a large part of these developments has not yet been used in industrial production. The first grippers developed for microassembly were basically vacuum grippers and downscaled tweezers. Due to increasingly complex assembly tasks more and more functionality such as sensing or additional functions such as adhesive dispensing has been integrated into gripper systems over the last years. Most of these gripper systems are incompatible since there exists no standard interface to the assembly machine and no standard for the internal modules and interfaces. Thus these tools are not easily interchangeable between assembly machines and not easily adaptable to assembly tasks. In order to alleviate this situation a construction kit for modular microgrippers is being developed. It is composed of modules with well defined interfaces that can be combined to build task specific grippers. An abstract model of a microgripper is proposed as a tool to structure the development of the construction kit. The modular concept is illustrated with prototypes.

  5. Concreting organization during Chernobylsk NPP construction

    International Nuclear Information System (INIS)

    Lysyuk, R.I.; Kareva, A.P.

    1984-01-01

    Conreting organization during the Chernobylsk NPP construction is described. Processes of extra heavy concrete production and placement, which specific mass constitutes 4t/m 3 at the age of 28 days wiath metallic aggregates and 3.3-3.5 t/m 3 at the same age without aggregates, are considered in short. Basic characteristics of this concrete are presented. At the 4th power unit labour contents for construction works were a 1.5 times lower as compared to the 3rd power unit erection. This progress was achieved by round-the-clock operation of the concrete plant with the 800 m 3 /day output and also by utilization of special equipment for mechanized concrete placement: concrete pumps, automatic concrete mixer, manipulators and concrete pipelines

  6. Sun safety in construction: a U.K. intervention study.

    Science.gov (United States)

    Houdmont, J; Madgwick, P; Randall, R

    2016-01-01

    Interventions to promote sun safety in the U.K. construction sector are warranted given the high incidence of skin cancer attributable to sun exposure relative to other occupational groups. To evaluate change in sun safety knowledge and practices among construction workers in response to an educational intervention. A baseline questionnaire was administered, followed by a bespoke sector-specific DVD-based intervention. At 12-month follow-up, participants completed a further questionnaire. Analyses were conducted on a sample of 120 workers (intervention group, n = 70; comparison group, n = 50). At follow-up, the proportion of intervention group participants that reported correct sun safety knowledge was not significantly greater than at baseline. However, the intervention group demonstrated significant positive change on 9 out of 10 behavioural measures, the greatest change being use of a shade/cover when working in the sun followed by regularly checking skin for moles or unusual changes. Exposure to this intervention was linked to some specific positive changes in construction workers' self-reported sun safety practices. These findings highlight the potential for educational interventions to contribute to tackling skin cancer in the UK construction sector. The findings support the development of bespoke educational interventions for other high-risk outdoor worker groups. © The Author 2015. Published by Oxford University Press on behalf of the Society of Occupational Medicine. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  7. Evaluation and construction of diagnostic criteria for inclusion body myositis

    Science.gov (United States)

    Mammen, Andrew L.; Amato, Anthony A.; Weiss, Michael D.; Needham, Merrilee

    2014-01-01

    Objective: To use patient data to evaluate and construct diagnostic criteria for inclusion body myositis (IBM), a progressive disease of skeletal muscle. Methods: The literature was reviewed to identify all previously proposed IBM diagnostic criteria. These criteria were applied through medical records review to 200 patients diagnosed as having IBM and 171 patients diagnosed as having a muscle disease other than IBM by neuromuscular specialists at 2 institutions, and to a validating set of 66 additional patients with IBM from 2 other institutions. Machine learning techniques were used for unbiased construction of diagnostic criteria. Results: Twenty-four previously proposed IBM diagnostic categories were identified. Twelve categories all performed with high (≥97%) specificity but varied substantially in their sensitivities (11%–84%). The best performing category was European Neuromuscular Centre 2013 probable (sensitivity of 84%). Specialized pathologic features and newly introduced strength criteria (comparative knee extension/hip flexion strength) performed poorly. Unbiased data-directed analysis of 20 features in 371 patients resulted in construction of higher-performing data-derived diagnostic criteria (90% sensitivity and 96% specificity). Conclusions: Published expert consensus–derived IBM diagnostic categories have uniformly high specificity but wide-ranging sensitivities. High-performing IBM diagnostic category criteria can be developed directly from principled unbiased analysis of patient data. Classification of evidence: This study provides Class II evidence that published expert consensus–derived IBM diagnostic categories accurately distinguish IBM from other muscle disease with high specificity but wide-ranging sensitivities. PMID:24975859

  8. Toxic or dangerous substances present construction materials

    International Nuclear Information System (INIS)

    Campos Alvarado, A.

    2003-01-01

    The purpose of this investigation is the elaboration of a guide which could be used as a support and consultation concerning the topic of safety in the construction, specifically in the area of the use and managing of material and dangerous substances; considering the possible dangers to medium and long term that some of the common construction materials represent for the health. The gathered information is the result of the review of bibliographical material, the visits to public institutions at national level and to international offices which representation in our country, this way as a work of field and of study of the national market, among others. Besides important consult through the Internet checking many sites of interest with the finality of getting more updated information as possible, like that as the consultation to professionals and workers related to the construction area. (Author) [es

  9. Potential and Benefits of Building Information Modeling (BIM During Pre-Construction, Construction and Post Construction Stage

    Directory of Open Access Journals (Sweden)

    Aw Nien Wei

    2017-11-01

    Full Text Available The construction industry is the main economic support for all countries around the world in which continually adapting to meet competitive challenges around the global market. Nevertheless, the construction project is becoming much more complex and difficult to manage. This is because the construction project involves a large number of stakeholder, for example, the consultant companies, architects, engineers, building surveyors and quantity surveyors. The technology currently used in the construction industry is the AutoCAD (Automatic computeraided design. AutoCAD is a commercial software application for 2D and 3D computer-aided design (CAD and drafting develop by Autodesk. Generally, all the drawing design from Autocad will be exchanged among the stakeholder in the form of paper. Information exchanged among them mostly involves a lot of documents and drawings. This practice creates errors because of documents and drawings are mostly in a paper-based format that is not properly managed which results in miscommunication among them. Having wrong information in the construction process could hinder the productivity of projects because in a construction project information is one of the important construction materials. Building Information Modeling (BIM is one of the newly software in the architecture, engineering, and construction (AEC industries to ensure all parties receive the right information. BIM technology is also an intelligent model of a building constructed digitally in the way of 3D. The software will generate model containing the information needed to support the construction, fabrication, and procurement activities that needed to realize the building. This paper will discuss on potential and benefits of BIM during pre-construction stage, construction stage and during post construction stage

  10. Automata learning algorithms and processes for providing more complete systems requirements specification by scenario generation, CSP-based syntax-oriented model construction, and R2D2C system requirements transformation

    Science.gov (United States)

    Hinchey, Michael G. (Inventor); Margaria, Tiziana (Inventor); Rash, James L. (Inventor); Rouff, Christopher A. (Inventor); Steffen, Bernard (Inventor)

    2010-01-01

    Systems, methods and apparatus are provided through which in some embodiments, automata learning algorithms and techniques are implemented to generate a more complete set of scenarios for requirements based programming. More specifically, a CSP-based, syntax-oriented model construction, which requires the support of a theorem prover, is complemented by model extrapolation, via automata learning. This may support the systematic completion of the requirements, the nature of the requirement being partial, which provides focus on the most prominent scenarios. This may generalize requirement skeletons by extrapolation and may indicate by way of automatically generated traces where the requirement specification is too loose and additional information is required.

  11. High volume tidal or current flow harnessing system

    Energy Technology Data Exchange (ETDEWEB)

    Gorlov, A.M.

    1984-08-07

    Apparatus permitting the utilization of large volumes of water in the harnessing and extracting of a portion of the power generated by the rise and fall of ocean tides, ocean currents, or flowing rivers includes the provision of a dam, and a specialized single cavity chamber of limited size as compared with the water head enclosed by the dam, and an extremely high volume gating system in which all or nearly all of the water between the high and low levels on either side of the dam is cyclically gated through the single chamber from one side of the dam to the other so as to alternately provide positive air pressure and a partial vacuum within the single chamber. In one embodiment, the specialized chamber has a barrier at the bottom which divides the bottom of the chamber in half, large ports at the bottom of the chamber to permit inflow and outflow of high volumes of water, and ganged structures having a higher total area than that of corresponding ports, in which the structures form sluice gates to selectively seal off and open different sets of ports. In another embodiment, a single chamber is used without a barrier. In this embodiment, vertical sluice gates are used which may be activated automatically by pressures acting on the sluice gates as a result of ingested and expelled water.

  12. Building Information Modeling for Managing Design and Construction

    DEFF Research Database (Denmark)

    Berard, Ole Bengt

    outcome of construction work. Even though contractors regularly encounter design information problems, these issues are accepted as a condition of doing business and better design information has yet to be defined. Building information modeling has the inherent promise of improving the quality of design...... information for work tasks. * Amount of Information – the number of documents and files, and other media, should be appropriate for the scope. The criteria were identified by empirical studies and theory on information quality in the architectural, engineering and construction (AEC) industry and other fields......Contractors planning and executing construction work encounter many kinds of problems with design information, such as uncoordinated drawings and specification, missing relevant information, and late delivery of design information. Research has shown that missing design information and unintended...

  13. 46 CFR 164.015-1 - Applicable specifications and standards.

    Science.gov (United States)

    2010-10-01

    ..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Plastic Foam, Unicellular, Buoyant, Sheet... following specification and standard, of the issue in effect on the date the plastic foam material is...) ASTM D4986-98, Standard Test Method for Horizontal Burning Characteristics of Cellular Polymeric...

  14. Cancer cell specific cytotoxic gene expression mediated by ARF tumor suppressor promoter constructs

    International Nuclear Information System (INIS)

    Kurayoshi, Kenta; Ozono, Eiko; Iwanaga, Ritsuko; Bradford, Andrew P.; Komori, Hideyuki; Ohtani, Kiyoshi

    2014-01-01

    Highlights: • ARF promoter showed higher responsiveness to deregulated E2F activity than the E2F1 promoter. • ARF promoter showed higher cancer cell-specificity than E2F1 promoter to drive gene expression. • HSV-TK driven by ARF promoter showed higher cancer cell-specific cytotoxicity than that driven by E2F1 promoter. - Abstract: In current cancer treatment protocols, such as radiation and chemotherapy, side effects on normal cells are major obstacles to radical therapy. To avoid these side effects, a cancer cell-specific approach is needed. One way to specifically target cancer cells is to utilize a cancer specific promoter to express a cytotoxic gene (suicide gene therapy) or a viral gene required for viral replication (oncolytic virotherapy). For this purpose, the selected promoter should have minimal activity in normal cells to avoid side effects, and high activity in a wide variety of cancers to obtain optimal therapeutic efficacy. In contrast to the AFP, CEA and PSA promoters, which have high activity only in a limited spectrum of tumors, the E2F1 promoter exhibits high activity in wide variety of cancers. This is based on the mechanism of carcinogenesis. Defects in the RB pathway and activation of the transcription factor E2F, the main target of the RB pathway, are observed in almost all cancers. Consequently, the E2F1 promoter, which is mainly regulated by E2F, has high activity in wide variety of cancers. However, E2F is also activated by growth stimulation in normal growing cells, suggesting that the E2F1 promoter may also be highly active in normal growing cells. In contrast, we found that the tumor suppressor ARF promoter is activated by deregulated E2F activity, induced by forced inactivation of pRB, but does not respond to physiological E2F activity induced by growth stimulation. We also found that the deregulated E2F activity, which activates the ARF promoter, is detected only in cancer cell lines. These observations suggest that ARF promoter

  15. Cancer cell specific cytotoxic gene expression mediated by ARF tumor suppressor promoter constructs

    Energy Technology Data Exchange (ETDEWEB)

    Kurayoshi, Kenta [Department of Bioscience, School of Science and Technology, Kwansei Gakuin University, 2-1 Gakuen, Sanda, Hyogo 669-1337 (Japan); Ozono, Eiko [Centre for Molecular Oncology, Barts Cancer Institute, Queen Mary, University of London, John Vane Science Centre, Charterhouse Square, London EC1M 6BQ (United Kingdom); Iwanaga, Ritsuko; Bradford, Andrew P. [Department of Obstetrics and Gynecology, University of Colorado School of Medicine, Anschutz Medical Campus, 12800 East 19th Avenue, Aurora, CO 80045 (United States); Komori, Hideyuki [Center for Stem Cell Biology, Life Sciences Institute, University of Michigan, Ann Arbor, MI 48109 (United States); Ohtani, Kiyoshi, E-mail: btm88939@kwansei.ac.jp [Department of Bioscience, School of Science and Technology, Kwansei Gakuin University, 2-1 Gakuen, Sanda, Hyogo 669-1337 (Japan)

    2014-07-18

    Highlights: • ARF promoter showed higher responsiveness to deregulated E2F activity than the E2F1 promoter. • ARF promoter showed higher cancer cell-specificity than E2F1 promoter to drive gene expression. • HSV-TK driven by ARF promoter showed higher cancer cell-specific cytotoxicity than that driven by E2F1 promoter. - Abstract: In current cancer treatment protocols, such as radiation and chemotherapy, side effects on normal cells are major obstacles to radical therapy. To avoid these side effects, a cancer cell-specific approach is needed. One way to specifically target cancer cells is to utilize a cancer specific promoter to express a cytotoxic gene (suicide gene therapy) or a viral gene required for viral replication (oncolytic virotherapy). For this purpose, the selected promoter should have minimal activity in normal cells to avoid side effects, and high activity in a wide variety of cancers to obtain optimal therapeutic efficacy. In contrast to the AFP, CEA and PSA promoters, which have high activity only in a limited spectrum of tumors, the E2F1 promoter exhibits high activity in wide variety of cancers. This is based on the mechanism of carcinogenesis. Defects in the RB pathway and activation of the transcription factor E2F, the main target of the RB pathway, are observed in almost all cancers. Consequently, the E2F1 promoter, which is mainly regulated by E2F, has high activity in wide variety of cancers. However, E2F is also activated by growth stimulation in normal growing cells, suggesting that the E2F1 promoter may also be highly active in normal growing cells. In contrast, we found that the tumor suppressor ARF promoter is activated by deregulated E2F activity, induced by forced inactivation of pRB, but does not respond to physiological E2F activity induced by growth stimulation. We also found that the deregulated E2F activity, which activates the ARF promoter, is detected only in cancer cell lines. These observations suggest that ARF promoter

  16. 17 CFR 256.01-4 - Construction or service contracts, and centralized procurement accounting.

    Science.gov (United States)

    2010-04-01

    ... contracts, and centralized procurement accounting. 256.01-4 Section 256.01-4 Commodity and Securities... § 256.01-4 Construction or service contracts, and centralized procurement accounting. (a) Specific accounts have not been provided in which to classify expenditures made in the performance of construction...

  17. causes of conflicts in construction projects in nigeria

    African Journals Online (AJOL)

    user

    NIGERIA. 2 DEPARTMENT OF ARCHITECTURE AND CIVIL ENGINEERING, CITY ... Thus, this study was aimed at identifying and assessing causes of conflicts in Nigeria .... technical specification, government intervention, ..... scale construction projects: A case study,” Constr. ... study of Bygga Villa, a Swedish triple helix e-.

  18. Zebrafish transgenic constructs label specific neurons in Xenopus laevis spinal cord and identify frog V0v spinal neurons.

    Science.gov (United States)

    Juárez-Morales, José L; Martinez-De Luna, Reyna I; Zuber, Michael E; Roberts, Alan; Lewis, Katharine E

    2017-09-01

    A correctly functioning spinal cord is crucial for locomotion and communication between body and brain but there are fundamental gaps in our knowledge of how spinal neuronal circuitry is established and functions. To understand the genetic program that regulates specification and functions of this circuitry, we need to connect neuronal molecular phenotypes with physiological analyses. Studies using Xenopus laevis tadpoles have increased our understanding of spinal cord neuronal physiology and function, particularly in locomotor circuitry. However, the X. laevis tetraploid genome and long generation time make it difficult to investigate how neurons are specified. The opacity of X. laevis embryos also makes it hard to connect functional classes of neurons and the genes that they express. We demonstrate here that Tol2 transgenic constructs using zebrafish enhancers that drive expression in specific zebrafish spinal neurons label equivalent neurons in X. laevis and that the incorporation of a Gal4:UAS amplification cassette enables cells to be observed in live X. laevis tadpoles. This technique should enable the molecular phenotypes, morphologies and physiologies of distinct X. laevis spinal neurons to be examined together in vivo. We have used an islet1 enhancer to label Rohon-Beard sensory neurons and evx enhancers to identify V0v neurons, for the first time, in X. laevis spinal cord. Our work demonstrates the homology of spinal cord circuitry in zebrafish and X. laevis, suggesting that future work could combine their relative strengths to elucidate a more complete picture of how vertebrate spinal cord neurons are specified, and function to generate behavior. © 2017 Wiley Periodicals, Inc. Develop Neurobiol 77: 1007-1020, 2017. © 2017 Wiley Periodicals, Inc.

  19. Statewide test of construction quality index for pavement software : final report, October 2008.

    Science.gov (United States)

    2008-10-01

    All Florida Department of Transportation (FDOT) pavement projects are accepted in accordance with : one or more construction specifications. The purposes of these specifications are to provide guidance : and establish minimum requirements that enable...

  20. Development and construction of a specific chamber for phototoxicity test

    International Nuclear Information System (INIS)

    Sufi, Bianca S.; Mathor, Monica B.; Esteves-Pedro, Natalia M.; Kaneko, Telma Mary

    2013-01-01

    Phototoxicity corresponds to the acute toxic response induced after skin exposure 'in vivo' and 'ex vivo' to certain chemicals and subsequent exposure to irradiation. Phototoxicity 'in vitro' assay is determined by viability of fibroblasts BALB/c 3T3 exposed to chemicals in the presence and absence of light. Substances identified as phototoxic are susceptible to 'in vivo' phototoxicity (OECD 432, 2004). A chamber was developed and constructed according to the guidelines OECD Toxicity Guide - 432 and ®ECVAM DB-ALM: INVITTOX N. 78. The chamber was built in stainless steel frame, with UVA lamps and dark area for negative control. The tests to qualify the chamber were performed with Sodium Lauryl Sulfate, recommended by the guides aforementioned, as negative control; and Bergamot oil (Givaudan-Roche), as positive control. Bergamot, Citrus bergamia, has, as major component, Bergapten responsible for its photosensitive activity. Both samples were diluted in Phosphate Buffered Saline with concentrations between 0.005 and 0.1 mg/mL, which were calculated by the dilution factor 1.47. These tests were performed over fibroblast BALB/c 3T3 culture and submitted to phototoxicity assay with MTS dye, under spectrophotometric reading, which allows determining the Photo Irritation Factor (PIF), what suggests that a substance with a PIF 2 and 5 provides phototoxicity. Sodium Lauryl Sulfate presented a PIF=1, being in accordance with the OECD. Bergamot oil has shown to be likely phototoxic with a PIF=2,475. These results provide that the chamber is qualified to be used to perform phototoxicity tests with assurance and security. (author)

  1. Environmental impacts of construction materials. A report on the contribution of construction materials to greenhouse gas emissions of construction; Rakennusmateriaalien ympaeristoevaikutukset. Selvitys rakennusmateriaalien vaikutuksesta rakentamisen kasvihuonekaasupaeaestoeihin, tiivistelmaeraportti

    Energy Technology Data Exchange (ETDEWEB)

    Ruuska, A.; Haekkinen, T.; Vares, S.; Korhonen, M.-R.; Myllymaa, T.

    2013-05-15

    As the energy performance of new construction improves and the related greenhouse gas (GHG) emissions diminish the carbon footprint of construction materials becomes more important. One objective in the current government's programme is to take into account construction materials and products in the energy performance assessment of buildings. At the request of the Ministry of the Environment, VTT Technical Research Centre of Finland and the Finnish Environment Institute analysed, through a case study, the significance of the environmental impacts of construction materials. The aim was to develop preliminary recommendations for guiding construction. The case study calculated the overall GHG emissions from the materials used in an apartment building over its life cycle and estimated the range of emissions. In addition, the amount of construction waste was assessed, as was the effects of waste management and waste utilisation processes on GHG emissions. This report presents a summary of the results. According to this case study, GHG emissions can vary in typical multi-storey residential buildings within the range of 1 to 2.2 or 1 to 3.9 when the site foundation work also taken into account. The study shows that the construction materials and related processes contribute significantly to the GHG emissions of a building over its life cycle. In fact the level of significance is of the same order as the heating of spaces in an A-class energy performance building. The efficient recycling of materials can contribute to reductions in GHG emissions. The study showed that the estimated benefit was 9 % of the total life-cycle emissions. In the future, specific assessments of different types of waste could look at opportunities for the recycling and reuse of critical materials. Plastics and wood are especially important waste components. Future research topics include improving the use of recycled materials, collecting information on user experiences and enhancing quality

  2. Impact of ACI-ASME code on design and construction of nuclear containment structures

    International Nuclear Information System (INIS)

    Reedy, R.F.

    1978-01-01

    The effect of the ACI-ASME code for design and construction of concrete containment structures on the nuclear and concrete industries is examined. Topics covered include purpose of the code, general requirements, responsibilities and duties, design and construction specifications, quality assurance, inspection, the liner, and stamping

  3. 46 CFR 58.50-15 - Alternate material for construction of independent fuel tanks.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Alternate material for construction of independent fuel...) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Independent Fuel Tanks § 58.50-15 Alternate material for construction of independent fuel tanks. (a) Materials other than those specifically...

  4. Characterisation of reactor control rod drives. Specification 1-6

    International Nuclear Information System (INIS)

    1975-03-01

    The committee 'Kernreaktorregelung' of VDI/VDE-Gesellschaft Mess- und Regelungstechnik has developed 6 specifications (Typenblaetter) of reactor control rod drives. The specifications are aimed at giving engineers in reactor control systems an outline concerning the function as well as some construction characteristics. (orig./LN) [de

  5. Effect of Pre-Construction on Construction Schedule and Client Loyalty

    OpenAIRE

    Jong Hoon Kim; Hyun-Soo Lee; Moonseo Park; Min Jeong; Inbeom Lee

    2016-01-01

    Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client sat...

  6. Improved Necker Cube Drawing-Based Assessment Battery for Constructional Apraxia: The Mie Constructional Apraxia Scale (MCAS

    Directory of Open Access Journals (Sweden)

    Masayuki Satoh

    2016-09-01

    Full Text Available Background/Aims: Constructional apraxia (CA is usually diagnosed by having patients draw figures; however, the reported assessments only evaluate the drawn figure. We designed a new assessment battery for CA (the Mie Constructional Apraxia Scale, MCAS which includes both the shape and drawing process, and investigated its utility against other assessment methods. Methods: We designed the MCAS, and evaluated inter- and intrarater reliability. We also investigated the sensitivity, specificity, and positive and negative predictive values in dementia patients, and compared MCAS assessment with other reported batteries in the same subjects. Results: Moderate interrater reliability was shown for speech therapists with limited experience. Moderate to substantial intrarater reliability was shown several weeks after initial assessment. When cutoff scores and times were set at 2/3 points and 39/40 s, sensitivity and specificity were 77.1 and 70.4%, respectively, with positive and negative predictive values of 80.0 and 66.7%, respectively. Dementia patients had significantly worse scores and times for Necker cube drawing than an elderly control group on the MCAS, and on other assessments. Conclusions: We conclude that the MCAS, which includes both the assessment of the drawn Necker cube shape and the drawing process, is useful for detecting even mild CA.

  7. Organisation, ‘anchoring’ of knowledge, and innovation in the construction industry

    DEFF Research Database (Denmark)

    Drejer, Ina; Vinding, Anker Lund

    2004-01-01

    explanation for the relatively poor innovation performance of the industry. Using survey data from the Danish construction industry the paper investigates the importance of learning and ?anchoring? of project specific knowledge within the firms for facilitating engagement in innovative activities...... at the firm level. The data refer to the overall Danish construction industry, as well as a specific region, North Jutland, which is relatively specialised in construction. By using latent class and regression analysis the results show that firms, which to a high extent make use of partnering and other...... interorganisational features, combined with internal product and process evaluation and knowledge diffusion, are more likely to engage in innovative activities than firms that make less use of what we label ?knowledge anchoring mechanisms?. This indicates that there are ways for firms to compensate for the problems...

  8. Problem of dynamic impacts upon NPP buildings and constructions

    International Nuclear Information System (INIS)

    Kosterev, A.E.

    1998-01-01

    Activities of IAEA member-states dealing with the problems of taking into account external natural and technogenic impacts (earthquakes, cyclones, hurricanes, aircraft crushes, air shock waves) when designing NPP buildings and constructions important for nuclear and radiation safety are briefly discussed. It is concluded that development of IAEA general recommendations for taking into account specific dynamic impacts will improve noticeably safety of NPPs being in operation both in Russia and all over the World as a result of reconstruction of safety-important buildings and constructions

  9. Fire resistance in American heavy timber construction history and preservation

    CERN Document Server

    Heitz, Jesse

    2016-01-01

    This volume presents a history of heavy timber construction (HTC) in the United States, chronicling nearly two centuries of building history, from inception to a detailed evaluation of one of the best surviving examples of the type, with an emphasis on fire resistance. The book does not limit itself in scope to serving only as a common history. Rather, it provides critical analysis of HTC in terms of construction methods, design, technical specifications, and historical performance under fire conditions. As such, this book provides readers with a truly comprehensive understanding and exploration of heavy timber construction in the United States and its performance under fire conditions.

  10. Foreign Market Selection Factors in the Australian Construction Services Sector

    Directory of Open Access Journals (Sweden)

    Faiza El-Higzi

    2012-11-01

    Full Text Available A survey of Australian construction companies is described, aimed at identifying the mainfactors considered when choosing foreign markets for their international activities. Thishighlights the importance of the host country’s economic, political and structural factors,the interplay of company motivations for expansion and the availability of a relevant constructionproject. Other factors influence a company’s approach to overseas operations,but do not significantly affect the choice of country. Also identified is a need to improvegovernment approaches to construction service expansion to other countries, with a focuson specific projects and policy regulations to assist the industry, and to build closer relationsbetween construction companies and financial institutions.

  11. Sustainable Construction Risk Perceptions in the Kuwaiti Construction Industry

    Directory of Open Access Journals (Sweden)

    Dalya Ismael

    2018-06-01

    Full Text Available Sustainable construction is fundamentally different than traditional construction because it requires whole systems thinking, early collaboration across stakeholders, and core principles like reducing resource consumption, eliminating toxins, and applying life cycle costing. Construction professionals unfamiliar with this mindset and approach may perceive sustainable construction as risky. One of the global regions in need of more sustainable construction is the Middle Eastern and North African (MENA region. The MENA region is one of the fastest developing in the world. However, it is the slowest one in implementing sustainable construction practices. Kuwait, in particular, contributes 53% more carbon emissions per capita than the United States. To understand how the Kuwaiti construction industry perceives risks associated with more sustainable construction, a survey was developed with 52 risk elements in which 131 industry professionals responded. The results indicate that industry professionals perceive a lack of public awareness as the risk element with the highest probability of occurrence. The risk element with the highest possible negative impact on future projects is designers’ and contractors’ inexperience with sustainable construction. Other risks were found to include a high initial cost for materials and overall project costs. Educational interventions, changes in risk allocation, and behavioral science to reframe upfront costs as long-term savings are offered as possible solutions.

  12. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue

  13. Tanks Focus Area retrieval process development and enhancements FY96 technology development summary report

    International Nuclear Information System (INIS)

    Rinker, M.W.; Bamberger, J.A.; Hatchell, B.K.

    1996-09-01

    The Retrieval Process Development and Enhancements (RPD ampersand E) activities are part of the Retrieval and Closure Program of the U.S. Department of Energy (DOE) EM-50 Tanks Focus Area. The purposes of RPD ampersand E are to understand retrieval processes, including emerging and existing technologies, and to gather data on those processes, so that end users have the requisite technical basis to make retrieval decisions. Work has been initiated to support the need for multiple retrieval technologies across the DOE complex. Technologies addressed during FY96 focused on enhancements to sluicing, borehole mining, confined sluicing retrieval end effectors, the lightweight scarifier, and pulsed air mixing. Furthermore, a decision tool and database have been initiated to link retrieval processes with tank closure to assist end users in making retrieval decisions

  14. Slicing AADL specifications for model checking

    NARCIS (Netherlands)

    Odenbrett, M.R.; Nguyen, V.Y.; Noll, T.

    2010-01-01

    To combat the state-space explosion problem in model checking larger systems, abstraction techniques can be employed. Here, methods that operate on the system specification before constructing its state space are preferable to those that try to minimize the resulting transition system as they

  15. Paradigmatic List Constructions. Patterns and Functions

    Directory of Open Access Journals (Sweden)

    Valentina Benigni

    2016-02-01

    Full Text Available This paper deals with listing as a useful conceptual tool for categorization and offers an overview of the different types of lists in Russian, highlighting both universal and language-specific characteristics of this kind of construction. The data-driven approach adopted in this study allows you to identify the main criteria according to which lists can be classified (exhaustiveness of the enumeration, conjunction, types of constituents, compositionality, and so on. Particular attention is paid to paradigmatic lists, i.e. lists whose items are in a paradigmatic relationship with each other as either synonyms, co-hyponyms or co-meronyms. The features of this family of lists are dealt with in the framework of Construction Grammar, which accounts for both similarities in structure and meaning and differences in pragmatic and communicative functions.

  16. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  17. Some impacts and mitigations for small hydro developments in Newfoundland and Labrador

    International Nuclear Information System (INIS)

    Buchanan, R.

    1993-01-01

    Potential adverse impacts of small hydro power plants were defined and some of the mitigative techniques that can be used to eliminate or alleviate these impacts were outlined. Potential adverse impacts involved in the construction of hydro projects were identified as those associated with construction of dams, borrow areas, access roads, powerhouses, canals, penstocks, and transmission lines. Fish passage and fish habitat maintenance were also among the major issues that confront most of the proposed small hydro projects in Newfoundland. Fish passage and habitat issues received particular attention in view of their obvious importance in a province where fishing is a way of life for large segments of the population. Major challenges included both upstream and downstream fish passage, and maintenance flows downstream of dams. Upstream migration could be facilitated by fishways. Downstream migration of Atlantic salmon smolts was said to be more problematic, but could be addressed by strategies such as intake design, screens, bypasses, sluices, turbine selection, plant shutdowns at critical times and operation of turbines at peak efficiencies. 12 refs., 2 tabs

  18. Alternatives to Conventional Construction Materials on Landfills. A Guide; Alternativa konstruktionsmaterial paa deponier. Vaegledning

    Energy Technology Data Exchange (ETDEWEB)

    Rihm, Thomas; Rogbeck, Yvonne; Svedberg, Bo; Eriksson, Maria

    2009-03-15

    therefore the over all impact caused by the construction at the specific site that has to be assessed, not the behaviour of the individual materials. To assess the impact it is however necessary that deliverer of materials can supply the constructor with the relevant information concerning the materials including: Hydraulic properties; Shear strength; Durability; Total content; and Leaching behaviour. There are often well known methods to control the function of a construction. It is more difficult to assess the environmental impact from the construction itself. In this report site specific assessments are recommended. To assess risks associated with dermal contact, inhalation of dust and gas and oral intake, a model for assessing limit values for contaminated soil, presented by the Swedish Environmental Protection Agency, can be utilised. Concerning the risks associated with contamination of surface and ground water, it is suggested that the assessments should be based on leaching behaviour and the site specific conditions. The leaching behaviour of a construction under real conditions is difficult to estimate. It is therefore suggested that new constructions and constructions with new materials should be tested in pilot scale before they are used in full scale. It is normally difficult to monitor the function of a construction when the capping is completed. Furthermore it is sometimes impossible to correct mistakes made in the construction design or building process. It is of vital importance that there is a good quality assurance system for the materials and for the building process. This report aims at providing guidance concerning: Goals and legislation influencing the design of constructions on a landfill; Functional and environmental requirements of constructions; General conditions for construction work on a landfill site; The capping construction design; Material behaviour; Methodology for assessing environmental behaviour of the construction; A description of some

  19. Construction Managers’ Perception of the Factors Affecting Sustainability in Construction Projects

    OpenAIRE

    Reza Taheriattar; Morvarid Farzanehrafat

    2014-01-01

    Sustainable construction is a comprehensive concept which requires long-term planning. Moreover, construction managers play a key role in leading, planning and scheduling of a construction project. As a result, sustainability of construction projects can be affected by construction managers’ decisions. In addition, for greater development of sustainable construction, affecting factors should firstly be notified. Therefore, it seems necessary to investigate construction managers’ perception of...

  20. A multi-agent safety response model in the construction industry.

    Science.gov (United States)

    Meliá, José L

    2015-01-01

    The construction industry is one of the sectors with the highest accident rates and the most serious accidents. A multi-agent safety response approach allows a useful diagnostic tool in order to understand factors affecting risk and accidents. The special features of the construction sector can influence the relationships among safety responses along the model of safety influences. The purpose of this paper is to test a model explaining risk and work-related accidents in the construction industry as a result of the safety responses of the organization, the supervisors, the co-workers and the worker. 374 construction employees belonging to 64 small Spanish construction companies working for two main companies participated in the study. Safety responses were measured using a 45-item Likert-type questionnaire. The structure of the measure was analyzed using factor analysis and the model of effects was tested using a structural equation model. Factor analysis clearly identifies the multi-agent safety dimensions hypothesized. The proposed safety response model of work-related accidents, involving construction specific results, showed a good fit. The multi-agent safety response approach to safety climate is a useful framework for the assessment of organizational and behavioral risks in construction.

  1. Facilitating Value Creation and Delivery in Construction Projects

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Bonke, Sten

    This thesis is about value creation in the early stages of construction design processes. It has been problem-driven with a specific management concept, the workshop model, as an outset. Essentially the question was; how should construction project design processes be managed with the objective...... awareness about the potential ‘pit-falls’ observed in the case-studies by means of three metaphors for reflection and design-group adjustment. These are: (1) Part-whole conversation, (2) Game of persuasion and (3) Hyper-reality. Reflection and adjustment may require the inclusion of a facilitator....... In addition, concrete suggestions for further development of the design management concept, the workshop model, are provided. In general, the thesis contributes to the emerging literature on construction design man-agement, which is still in its infancy. In addition, the theory part of the thesis contrib...

  2. Indigenous lunar construction materials

    Science.gov (United States)

    Rogers, Wayne P.; Sture, Stein

    1991-01-01

    The utilization of local resources for the construction and operation of a lunar base can significantly reduce the cost of transporting materials and supplies from Earth. The feasibility of processing lunar regolith to form construction materials and structural components is investigated. A preliminary review of potential processing methods such as sintering, hot-pressing, liquification, and cast basalt techniques, was completed. The processing method proposed is a variation on the cast basalt technique. It involves liquification of the regolith at 1200-1300 C, casting the liquid into a form, and controlled cooling. While the process temperature is higher than that for sintering or hot-pressing (1000-1100 C), this method is expected to yield a true engineering material with low variability in properties, high strength, and the potential to form large structural components. A scenario for this processing method was integrated with a design for a representative lunar base structure and potential construction techniques. The lunar shelter design is for a modular, segmented, pressurized, hemispherical dome which could serve as habitation and laboratory space. Based on this design, estimates of requirements for power, processing equipment, and construction equipment were made. This proposed combination of material processing method, structural design, and support requirements will help to establish the feasibility of lunar base construction using indigenous materials. Future work will refine the steps of the processing method. Specific areas where more information is needed are: furnace characteristics in vacuum; heat transfer during liquification; viscosity, pouring and forming behavior of molten regolith; design of high temperature forms; heat transfer during cooling; recrystallization of basalt; and refinement of estimates of elastic moduli, compressive and tensile strength, thermal expansion coefficient, thermal conductivity, and heat capacity. The preliminary

  3. A computational framework for the automated construction of glycosylation reaction networks.

    Science.gov (United States)

    Liu, Gang; Neelamegham, Sriram

    2014-01-01

    Glycosylation is among the most common and complex post-translational modifications identified to date. It proceeds through the catalytic action of multiple enzyme families that include the glycosyltransferases that add monosaccharides to growing glycans, and glycosidases which remove sugar residues to trim glycans. The expression level and specificity of these enzymes, in part, regulate the glycan distribution or glycome of specific cell/tissue systems. Currently, there is no systematic method to describe the enzymes and cellular reaction networks that catalyze glycosylation. To address this limitation, we present a streamlined machine-readable definition for the glycosylating enzymes and additional methodologies to construct and analyze glycosylation reaction networks. In this computational framework, the enzyme class is systematically designed to store detailed specificity data such as enzymatic functional group, linkage and substrate specificity. The new classes and their associated functions enable both single-reaction inference and automated full network reconstruction, when given a list of reactants and/or products along with the enzymes present in the system. In addition, graph theory is used to support functions that map the connectivity between two or more species in a network, and that generate subset models to identify rate-limiting steps regulating glycan biosynthesis. Finally, this framework allows the synthesis of biochemical reaction networks using mass spectrometry (MS) data. The features described above are illustrated using three case studies that examine: i) O-linked glycan biosynthesis during the construction of functional selectin-ligands; ii) automated N-linked glycosylation pathway construction; and iii) the handling and analysis of glycomics based MS data. Overall, the new computational framework enables automated glycosylation network model construction and analysis by integrating knowledge of glycan structure and enzyme biochemistry. All

  4. A computational framework for the automated construction of glycosylation reaction networks.

    Directory of Open Access Journals (Sweden)

    Gang Liu

    Full Text Available Glycosylation is among the most common and complex post-translational modifications identified to date. It proceeds through the catalytic action of multiple enzyme families that include the glycosyltransferases that add monosaccharides to growing glycans, and glycosidases which remove sugar residues to trim glycans. The expression level and specificity of these enzymes, in part, regulate the glycan distribution or glycome of specific cell/tissue systems. Currently, there is no systematic method to describe the enzymes and cellular reaction networks that catalyze glycosylation. To address this limitation, we present a streamlined machine-readable definition for the glycosylating enzymes and additional methodologies to construct and analyze glycosylation reaction networks. In this computational framework, the enzyme class is systematically designed to store detailed specificity data such as enzymatic functional group, linkage and substrate specificity. The new classes and their associated functions enable both single-reaction inference and automated full network reconstruction, when given a list of reactants and/or products along with the enzymes present in the system. In addition, graph theory is used to support functions that map the connectivity between two or more species in a network, and that generate subset models to identify rate-limiting steps regulating glycan biosynthesis. Finally, this framework allows the synthesis of biochemical reaction networks using mass spectrometry (MS data. The features described above are illustrated using three case studies that examine: i O-linked glycan biosynthesis during the construction of functional selectin-ligands; ii automated N-linked glycosylation pathway construction; and iii the handling and analysis of glycomics based MS data. Overall, the new computational framework enables automated glycosylation network model construction and analysis by integrating knowledge of glycan structure and enzyme

  5. Seeking Constructive Synergy: Design Science and the Constructive Research Approach

    DEFF Research Database (Denmark)

    Piirainen, Kalle; Gonzalez, Rafael A.

    2013-01-01

    Information systems research and management science create knowledge which can be applied in organizations. Design science specifically aims at applying existing knowledge to solve interesting and relevant business problems and has been steadily gaining support in information systems research....... However, design science is not the only design-oriented framework. Accordingly, this raises the question of whether it is possible to compare the results obtained from different brands of design-oriented research. This paper contributes to answering this question by comparing two research approaches......, enabling mutual learning possibilities and suggesting improvements in transparency and rigor. The objective of this paper is to compare design science research with the constructive research approach. The conclusion is that the two approaches are compatible, save for details in practical requirements...

  6. Plasmid construction using recombination activity in the fission yeast Schizosaccharomyces pombe.

    Directory of Open Access Journals (Sweden)

    Ayako Chino

    Full Text Available BACKGROUND: Construction of plasmids is crucial in modern genetic manipulation. As of now, the common method for constructing plasmids is to digest specific DNA sequences with restriction enzymes and to ligate the resulting DNA fragments with DNA ligase. Another potent method to construct plasmids, known as gap-repair cloning (GRC, is commonly used in the budding yeast Saccharomyces cerevisiae. GRC makes use of the homologous recombination activity that occurs within the yeast cells. Due to its flexible design and efficiency, GRC has been frequently used for constructing plasmids with complex structures as well as genome-wide plasmid collections. Although there have been reports indicating GRC feasibility in the fission yeast Schizosaccharomyces pombe, this species is not commonly used for GRC as systematic studies of reporting GRC efficiency in S. pombe have not been performed till date. METHODOLOGY/PRINCIPAL FINDINGS: We investigated GRC efficiency in S. pombe in this study. We first showed that GRC was feasible in S. pombe by constructing a plasmid that contained the LEU2 auxotrophic marker gene in vivo and showed sufficient efficiency with short homology sequences (>25 bp. No preference was shown for the sequence length from the cut site in the vector plasmid. We next showed that plasmids could be constructed in a proper way using 3 DNA fragments with 70% efficiency without any specific selections being made. The GRC efficiency with 3 DNA fragments was dramatically increased >95% in lig4Delta mutant cell, where non-homologous end joining is deficient. Following this approach, we successfully constructed plasmid vectors with leu1+, ade6+, his5+, and lys1+ markers with the low-copy stable plasmid pDblet as a backbone by applying GRC in S. pombe. CONCLUSIONS/SIGNIFICANCE: We concluded that GRC was sufficiently feasible in S. pombe for genome-wide gene functional analysis as well as for regular plasmid construction. Plasmids with different

  7. Development and construction of a specific chamber for phototoxicity test

    Energy Technology Data Exchange (ETDEWEB)

    Sufi, Bianca S.; Mathor, Monica B., E-mail: biancasufi@usp.br, E-mail: mathor@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil); Esteves-Pedro, Natalia M.; Kaneko, Telma Mary, E-mail: nataliamenves@yahoo.com.br, E-mail: tsakuda@usp.br [Universidade de Sao Paulo (USP), Sao Paulo, SP (Brazil). Fac. de Ciencias Farmaceuticas; Lopes, Patricia, E-mail: patricia.lopes@unifesp.br [Universidade Federal de Sao Paulo (UNIFESP), Diadema, SP (Brazil)

    2013-07-01

    Phototoxicity corresponds to the acute toxic response induced after skin exposure 'in vivo' and 'ex vivo' to certain chemicals and subsequent exposure to irradiation. Phototoxicity 'in vitro' assay is determined by viability of fibroblasts BALB/c 3T3 exposed to chemicals in the presence and absence of light. Substances identified as phototoxic are susceptible to 'in vivo' phototoxicity (OECD 432, 2004). A chamber was developed and constructed according to the guidelines OECD Toxicity Guide - 432 and ®ECVAM DB-ALM: INVITTOX N. 78. The chamber was built in stainless steel frame, with UVA lamps and dark area for negative control. The tests to qualify the chamber were performed with Sodium Lauryl Sulfate, recommended by the guides aforementioned, as negative control; and Bergamot oil (Givaudan-Roche), as positive control. Bergamot, Citrus bergamia, has, as major component, Bergapten responsible for its photosensitive activity. Both samples were diluted in Phosphate Buffered Saline with concentrations between 0.005 and 0.1 mg/mL, which were calculated by the dilution factor 1.47. These tests were performed over fibroblast BALB/c 3T3 culture and submitted to phototoxicity assay with MTS dye, under spectrophotometric reading, which allows determining the Photo Irritation Factor (PIF), what suggests that a substance with a PIF<2 predicts no phototoxicity; PIF>2 and <5 provides likely phototoxicity and PIF>5 provides phototoxicity. Sodium Lauryl Sulfate presented a PIF=1, being in accordance with the OECD. Bergamot oil has shown to be likely phototoxic with a PIF=2,475. These results provide that the chamber is qualified to be used to perform phototoxicity tests with assurance and security. (author)

  8. Assessing buyer-supplier relationship management: a multiple case-study in the Dutch construction industry

    NARCIS (Netherlands)

    Bemelmans, Jeroen; Voordijk, Johannes T.; Vos, B.; Buter, J.I.H.

    2012-01-01

    The objective of this paper is to shed light on obstacles to, and opportunities for, increasing the effectiveness of construction firms in managing buyer-supplier relationships. More specifically, the focus is on assessing the maturity level of buyer-supplier relationship management by construction

  9. Construction industry, e-business and marketing. Are the dot.coms pushing aside personal relationships?

    NARCIS (Netherlands)

    Tijhuis, Willem

    2001-01-01

    In the present globalizing construction industry, parties in construction industry are looking more internationally for enhancing their business-activities. But what stimulates these developments specifically? It seems to be that the role of information-technology is one of the big drivers for it,

  10. Assessing buyer-supplier relationship management : A multiple case-study in the Dutch construction industry

    NARCIS (Netherlands)

    Bemelmans, J.; Voordijk, H.; Vos, G.C.J.M.; Buter, J.

    2012-01-01

    The objective of this paper is to shed light on obstacles to, and opportunities for, increasing the effectiveness of construction firms in managing buyer-supplier relationships. More specifically, the focus is on assessing the maturity level of buyer-supplier relationship management by construction

  11. Developing a Best-Evidence Pre-employment Medical Examination: An Example from the Construction Industry

    NARCIS (Netherlands)

    Gouttebarge, Vincent; van der Molen, Henk F.; Frings-Dresen, Monique H. W.; Sluiter, Judith K.

    2014-01-01

    The Dutch construction industry has introduced a compulsory preemployment medical examination (PE-ME). Best-evidence contents related to specific job demands are, however, lacking and need to be gathered. After the identification of job demands and health problems in the construction industry

  12. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  13. 10-MWe solar-thermal central-receiver pilot plant: collector subsystem foundation construction. Revision No. 1

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-18

    Bid documents are provided for the construction of the collector subsystem foundation of the Barstow Solar Pilot Plant, including invitation to bid, bid form, representations and certifications, construction contract, and labor standards provisions of the Davis-Bacon Act. Instructions to bidders, general provisions and general conditions are included. Technical specifications are provided for the construction. (LEW)

  14. Processes in construction of failure management expert systems from device design information

    Science.gov (United States)

    Malin, Jane T.; Lance, Nick

    1987-01-01

    This paper analyzes the tasks and problem solving methods used by an engineer in constructing a failure management expert system from design information about the device to te diagnosed. An expert test engineer developed a trouble-shooting expert system based on device design information and experience with similar devices, rather than on specific expert knowledge gained from operating the device or troubleshooting its failures. The construction of the expert system was intensively observed and analyzed. This paper characterizes the knowledge, tasks, methods, and design decisions involved in constructing this type of expert system, and makes recommendations concerning tools for aiding and automating construction of such systems.

  15. Hygienic assessment of using rocks with high content of natural radionuclides in road construction

    International Nuclear Information System (INIS)

    Kornilov, A.N.; Ryabchikov, S.G.

    1983-01-01

    Experimental investigations on radiation hygienic assessment of the possibilities of using rocks with an increased content of natural radionuclides (NRN) are carried out. At experimental road portions constructed using such rocks, γ-radiation levels have been measured and radioactive contamination of the ad-- jacent territory has been determined. The danger presented by such roads for highway engineering workers and population also has been assessed. The results obtained permit to express a possitive opinion on the use of solid wastes with an increased NRN content for construction of roads with asphalt coating. Rocks with specific α-activity 3 Bq/kg are recommended to be used for any types of road construction, whereas wastes with specific α-activity 3 Bq/kg - only for road construction in an industrial zone, between populated areas and for thoroughfares and highways. The use of wastes with a higher NRN content is unreasonable as it leads to a growth of annular dose to population and excessive exposure of construction workers engaged in highway engineering operations

  16. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    There is no single satisfactory way to measure productivity in the construction industry. The industry is too varied, too specialized and too dependent upon vast numbers of interrelations between trades, contractors, designers and owners. Hence, no universally reliable indices for measuring construction productivity has been developed. There are problems that are generic to all large union-built nuclear power plants. The actions of any one owner cannot rectify the shortcomings of the construction industry. The generic problems are being identified, and many national organizations are attempting to make the construction industry more productive by recommending various changes

  17. Locating one pairwise interaction: Three recursive constructions

    Directory of Open Access Journals (Sweden)

    Charles J. Colbourn

    2016-09-01

    Full Text Available In a complex component-based system, choices (levels for components (factors may interact tocause faults in the system behaviour. When faults may be caused by interactions among few factorsat specific levels, covering arrays provide a combinatorial test suite for discovering the presence offaults. While well studied, covering arrays do not enable one to determine the specific levels of factorscausing the faults; locating arrays ensure that the results from test suite execution suffice to determinethe precise levels and factors causing faults, when the number of such causes is small. Constructionsfor locating arrays are at present limited to heuristic computational methods and quite specific directconstructions. In this paper three recursive constructions are developed for locating arrays to locateone pairwise interaction causing a fault.

  18. Electrochemical construction

    Science.gov (United States)

    Einstein, Harry; Grimes, Patrick G.

    1983-08-23

    An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

  19. Use of formwork systems in high-rise construction

    Science.gov (United States)

    Kurakova, Oksana

    2018-03-01

    Erection of high quality buildings and structures within a reasonable time frame is the crucial factor for the competitiveness of any construction organization. The main material used in high-rise construction is insitu reinforced concrete. The technology of its use is directly related to the use of formwork systems. Formwork systems and formwork technologies basically determine the speed of construction and labor intensity of concreting operations. Therefore, it is also possible to achieve the goal of reducing the construction time and labor intensity of works performed by improving the technology of formwork systems use. Currently there are unresolved issues in the area of implementation of monolithic technology projects, and problems related to the selection of a formwork technology, high labor intensity of works, poor quality of materials and structures, etc. are the main ones. The article presents organizational and technological measures, by means of which introduction it is possible to shorten the duration of construction. A comparison of operations performed during formwork installation according to the conventional technology and taking into account the implemented organizational and technological measures is presented. The results of a comparative analysis of economic efficiency assessments are also presented on the example of a specific construction project before and after the implementation of the above mentioned measures. The study showed that introduction of the proposed organizational and technological model taking into account optimization of reinforcing and concreting works significantly improves the efficiency of a high-rise construction project. And further improvement of technologies for the use of insitu reinforced concrete is a promising direction in the construction of high-rise buildings.

  20. Use of formwork systems in high-rise construction

    Directory of Open Access Journals (Sweden)

    Kurakova Oksana

    2018-01-01

    Full Text Available Erection of high quality buildings and structures within a reasonable time frame is the crucial factor for the competitiveness of any construction organization. The main material used in high-rise construction is insitu reinforced concrete. The technology of its use is directly related to the use of formwork systems. Formwork systems and formwork technologies basically determine the speed of construction and labor intensity of concreting operations. Therefore, it is also possible to achieve the goal of reducing the construction time and labor intensity of works performed by improving the technology of formwork systems use. Currently there are unresolved issues in the area of implementation of monolithic technology projects, and problems related to the selection of a formwork technology, high labor intensity of works, poor quality of materials and structures, etc. are the main ones. The article presents organizational and technological measures, by means of which introduction it is possible to shorten the duration of construction. A comparison of operations performed during formwork installation according to the conventional technology and taking into account the implemented organizational and technological measures is presented. The results of a comparative analysis of economic efficiency assessments are also presented on the example of a specific construction project before and after the implementation of the above mentioned measures. The study showed that introduction of the proposed organizational and technological model taking into account optimization of reinforcing and concreting works significantly improves the efficiency of a high-rise construction project. And further improvement of technologies for the use of insitu reinforced concrete is a promising direction in the construction of high-rise buildings.

  1. Quality assurance during site construction

    International Nuclear Information System (INIS)

    Dommke, J.; Jurgutat, H.

    1980-01-01

    During the time of planing and construction of a nuclear power plant, the following proceeding is approved: - the deliverer of a nuclear power plant provides the reports fixing the quality assurance program, it means that he is responsible to write the safety analysis report, the specifications for the erection of the components, the working manuals and specifications for testing (eg nondestr. testing) - the manufacturing of components or systems will be controlled by an own independent quality assurance group, provided that this group was checked by the quality assurance group of the applicant - the TUeV with its independent assessors will fix the requirements relating to quality assurance in its assessment. On this basis the examination of the applicants specifications, working manuals, testing specifications will be done. The efficiency of quality assurance at the manufacturer and at the applicant will be checked by the TUeV specialists by considering specifications of modifications, repairs or tolerances. A mean point of the quality assurance in Germany is the dynamic adjustment, of an action on the latest state of engineering or science. If there exists a change of rules or guidelines, the quality assurance requirements have to be fit on this state in so far as it is feasible from the technical point of view. (orig./RW)

  2. Validating MEDIQUAL Constructs

    Science.gov (United States)

    Lee, Sang-Gun; Min, Jae H.

    In this paper, we validate MEDIQUAL constructs through the different media users in help desk service. In previous research, only two end-users' constructs were used: assurance and responsiveness. In this paper, we extend MEDIQUAL constructs to include reliability, empathy, assurance, tangibles, and responsiveness, which are based on the SERVQUAL theory. The results suggest that: 1) five MEDIQUAL constructs are validated through the factor analysis. That is, importance of the constructs have relatively high correlations between measures of the same construct using different methods and low correlations between measures of the constructs that are expected to differ; and 2) five MEDIQUAL constructs are statistically significant on media users' satisfaction in help desk service by regression analysis.

  3. Review of AVLIS technology for production-scale LIS systems and construction

    International Nuclear Information System (INIS)

    Davis, J.I.; Moses, E.I.

    1983-12-01

    The use of lasers for uranium and/or plutonium isotope separation is expected to be the first application of lasers utilizing specific atomic processes for large-scale materials processing. Specific accomplishments toward the development of production-scale technology for LIS systems will be presented, along with the status of major construction projects. 24 figures

  4. Techniques for Minimizing and Monitoring the Impact of Pipeline Construction on Coastal Streams

    Science.gov (United States)

    Thomas W. Mulroy; John R. Storrer; Vincent J. Semonsen; Michael L. Dungan

    1989-01-01

    This paper describes specific measures recently employed for protection of riparian resources during construction of an oil and gas pipeline that crossed coastal reaches of 23 perennial and intermittent streams between Point Conception and Gaviota in Santa Barbara County, California. Flumes were constructed to maintain stream flow; anchored straw bales and silt fences...

  5. Construction and analysis of a plant non-specific lipid transfer protein database (nsLTPDB).

    Science.gov (United States)

    Wang, Nai-Jyuan; Lee, Chi-Ching; Cheng, Chao-Sheng; Lo, Wei-Cheng; Yang, Ya-Fen; Chen, Ming-Nan; Lyu, Ping-Chiang

    2012-01-01

    Plant non-specific lipid transfer proteins (nsLTPs) are small and basic proteins. Recently, nsLTPs have been reported involved in many physiological functions such as mediating phospholipid transfer, participating in plant defence activity against bacterial and fungal pathogens, and enhancing cell wall extension in tobacco. However, the lipid transfer mechanism of nsLTPs is still unclear, and comprehensive information of nsLTPs is difficult to obtain. In this study, we identified 595 nsLTPs from 121 different species and constructed an nsLTPs database--nsLTPDB--which comprises the sequence information, structures, relevant literatures, and biological data of all plant nsLTPs http://nsltpdb.life.nthu.edu.tw/. Meanwhile, bioinformatics and statistics methods were implemented to develop a classification method for nsLTPs based on the patterns of the eight highly-conserved cysteine residues, and to suggest strict Prosite-styled patterns for Type I and Type II nsLTPs. The pattern of Type I is C X2 V X5-7 C [V, L, I] × Y [L, A, V] X8-13 CC × G X12 D × [Q, K, R] X2 CXC X16-21 P X2 C X13-15C, and that of Type II is C X4 L X2 C X9-11 P [S, T] X2 CC X5 Q X2-4 C[L, F]C X2 [A, L, I] × [D, N] P X10-12 [K, R] X4-5 C X3-4 P X0-2 C. Moreover, we referred the Prosite-styled patterns to the experimental mutagenesis data that previously established by our group, and found that the residues with higher conservation played an important role in the structural stability or lipid binding ability of nsLTPs. Taken together, this research has suggested potential residues that might be essential to modulate the structural and functional properties of plant nsLTPs. Finally, we proposed some biologically important sites of the nsLTPs, which are described by using a new Prosite-styled pattern that we defined.

  6. Construction and analysis of a plant non-specific lipid transfer protein database (nsLTPDB

    Directory of Open Access Journals (Sweden)

    Wang Nai-Jyuan

    2012-01-01

    Full Text Available Abstract Background Plant non-specific lipid transfer proteins (nsLTPs are small and basic proteins. Recently, nsLTPs have been reported involved in many physiological functions such as mediating phospholipid transfer, participating in plant defence activity against bacterial and fungal pathogens, and enhancing cell wall extension in tobacco. However, the lipid transfer mechanism of nsLTPs is still unclear, and comprehensive information of nsLTPs is difficult to obtain. Methods In this study, we identified 595 nsLTPs from 121 different species and constructed an nsLTPs database -- nsLTPDB -- which comprises the sequence information, structures, relevant literatures, and biological data of all plant nsLTPs http://nsltpdb.life.nthu.edu.tw/. Results Meanwhile, bioinformatics and statistics methods were implemented to develop a classification method for nsLTPs based on the patterns of the eight highly-conserved cysteine residues, and to suggest strict Prosite-styled patterns for Type I and Type II nsLTPs. The pattern of Type I is C X2 V X5-7 C [V, L, I] × Y [L, A, V] X8-13 CC × G X12 D × [Q, K, R] X2 CXC X16-21 P X2 C X13-15C, and that of Type II is C X4 L X2 C X9-11 P [S, T] X2 CC X5 Q X2-4 C[L, F]C X2 [A, L, I] × [D, N] P X10-12 [K, R] X4-5 C X3-4 P X0-2 C. Moreover, we referred the Prosite-styled patterns to the experimental mutagenesis data that previously established by our group, and found that the residues with higher conservation played an important role in the structural stability or lipid binding ability of nsLTPs. Conclusions Taken together, this research has suggested potential residues that might be essential to modulate the structural and functional properties of plant nsLTPs. Finally, we proposed some biologically important sites of the nsLTPs, which are described by using a new Prosite-styled pattern that we defined.

  7. A Study of Construction Reactor Oversight Process in US

    International Nuclear Information System (INIS)

    Yun, I.; Kim, S. Y.; Jeong, G. Y.; Kim, S. P.

    2015-01-01

    This process provides a risk-informed approach such as construction significance determination process (SDP) and construction program performance index analogous to those used in the Reactor Oversight Process (ROP). The cROP has been applied to Vogtle units 3, 4 and V.C. Summer units 2, 3 under construction for the regulatory inspection. In this paper, the cROP is dissected to present its major contents and characteristics. The main features of the cROP can be summarized as followings: 1) The cROP which adopts the concept of the ROP used for operating NPPs assesses NPP under construction periodically to determine the appropriate level of regulatory response. 2) The cROP consists of three parts: the CIP, the CAP and the CEP. 3) The inspections for NPPs under construction can be categorized into three parts: vendor inspection, baseline inspection and supplemental and plant specific inspections. USNRC's regulatory resources can be used effectively based on baseline inspection, which is using ITAAC inspections. The construction SDP is used to assign the color scheme to categorize the significance of inspection findings. Regulatory actions are taken from CAM to which the significance of inspection findings input. In this paper, major contents and characteristics of USNRC's cROP have been presented

  8. Assessing the sustainable construction of large construction companies in Malaysia

    Science.gov (United States)

    Adewale, Bamgbade Jibril; Mohammed, Kamaruddeen Ahmed; Nasrun, Mohd Nawi Mohd

    2016-08-01

    Considering the increasing concerns for the consideration of sustainability issues in construction project delivery within the construction industry, this paper assesses the extent of sustainable construction among Malaysian large contractors, in order to ascertain the level of the industry's impacts on both the environment and the society. Sustainable construction explains the construction industry's responsibility to efficiently utilise the finite resources while also reducing construction impacts on both humans and the environment throughout the phases of construction. This study used proportionate stratified random sampling to conduct a field study with a sample of 172 contractors out of the 708 administered questionnaires. Data were collected from large contractors in the eleven states of peninsular Malaysia. Using the five-level rating scale (which include: 1= Very Low; 2= Low; 3= Moderate; 4= High; 5= Very High) to describe the level of sustainable construction of Malaysian contractors based on previous studies, statistical analysis reveals that environmental, social and economic sustainability of Malaysian large contractors are high.

  9. Nuclear civil construction, an essential activity dedicated to outstanding projects

    International Nuclear Information System (INIS)

    Herve, G.

    2016-01-01

    The complexity of nuclear civil construction is directly linked to the safety requirements imposed on nuclear facilities: durability in terms of time, stability, containment, tightness, managing cracking and leakages, quality controls... These requirements imply specific measures for instance the concrete that is used for the containment building has a particular composition that gives it an enhanced resistance or the substantial thickness of the foundation raft implies monitoring the temperature at which the concrete is poured. The construction of the EPR at the Flamanville site is taken as an example. This construction involves 120.000 tonnes of concrete-reinforcement steels, 400.000 m"3 of concrete, 400 km of pipes and 1600 km of cables. (A.C.)

  10. Dynamical construction of Horava-Lifshitz geometry

    OpenAIRE

    Banerjee, Rabin; Mukherjee, Pradip

    2015-01-01

    We derive the projectable version of Horava - Lifshitz gravity from the localisation of the Galilean symmetry. Specifically we provide a dynamical construction of the metric, from first principles, that reproduces the transformations of the physical variables - lapse, shift and spatial component of the metric. Also, the measure defining the action is reproduced. The geometrical basis of the Horava-Lifshitz gravity is thereby revealed which also elucidates its difference from the Newton-Cartan...

  11. Identification and Characterization of Particulate Matter Concentrations at Construction Jobsites

    Directory of Open Access Journals (Sweden)

    Ingrid P. S. Araújo

    2014-11-01

    Full Text Available The identification and characterization of particulate matter (PM concentrations from construction site activities pose major challenges due to the diverse characteristics related to different aspects, such as concentration, particle size and particle composition. Moreover, the characterization of particulate matter is influenced by meteorological conditions, including temperature, humidity, rainfall and wind speed. This paper is part of a broader investigation that aims to develop a methodology for assessing the environmental impacts caused by the PM emissions that arise from construction activities. The objective of this paper is to identify and characterize the PM emissions on a construction site with different aerodynamic diameters (PM2.5, PM10, total suspended particulates (TSP, based on an exploratory study. Initially, a protocol was developed to standardize the construction site selection criteria, laboratory procedures, field sample collection and laboratory analysis. This protocol was applied on a multifamily residential building construction site during three different construction phases (earthworks, superstructure and finishings aimed at measuring and monitoring PM concentrations arising from construction activities. The particulate matter was characterized in different particle sizes. Results showed that the higher TSP emissions arising from construction activities provoked environmental impacts. Some limitations to the results were identified, especially with regards the need for a detailed investigation about the influence of different construction phases on PM emissions. The findings provided significant knowledge about various situations, serving as a basis for improving the existing methodology for particulate material collection on construction sites and the development of future studies on the specific construction site phases.

  12. Construction QA/QC systems: comparative analysis

    International Nuclear Information System (INIS)

    Willenbrock, J.H.; Shepard, S.

    1980-01-01

    An analysis which compares the quality assurance/quality control (QA/QC) systems adopted in the highway, nuclear power plant, and U.S. Navy construction areas with the traditional quality control approach used in building construction is presented. Full participation and support by the owner as well as the contractor and AE firm are required if a QA/QC system is to succeed. Process quality control, acceptance testing and quality assurance responsibilities must be clearly defined in the contract documents. The owner must audit these responsibilities. A contractor quality control plan, indicating the tasks which will be performed and the fact that QA/QC personnel are independent of project time/cost pressures should be submitted for approval. The architect must develop realistic specifications which consider the natural variability of material. Acceptance criteria based on the random sampling technique should be used. 27 refs

  13. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam in 2004

    International Nuclear Information System (INIS)

    Johnson, Gary E.; Hanks, Michael E.; Khan, Fenton; Cook, Chris B.; Hedgepeth, J.; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Sargeant, Susan L.; Serkowski, John A.; Skalski, John R.

    2005-01-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate juvenile salmon passage at The Dalles Dam in 2004 to inform decisions about long-term measures and operations to enhance sluiceway and spill passage and reduce turbine passage to improve smolt survival at the dam. PNNL used fixed-location hydroacoustic sampling across the entire project, especially at the sluiceway and spillway, using multiple split-beam transducers at selected locations. At the sluiceway nearfield, we used an acoustic camera to track fish. The fish data were interpreted and integrated with hydraulic data from a CFD model and in-field ADCP measurements. Two sluiceway operations were compared: West only (SL 1) vs. West+East (SL 1 + SL 18). Based on our findings, we concluded that The Dalles Dam sluiceway has the potential to be highly efficient and effective at passing juvenile salmonids. This potential could be tapped with hydraulic and entrance enhancements to the sluiceway. We recommended the following: (1) six rather than three sluice gates should be opened to take advantage of the maximum hydraulic capacity of the sluiceway. (2) The turbine units below open sluice gates should be operated as a standard fish operations procedure. (3) In 2005, the Corps and fisheries agencies should consider operating sluice gates in one or more of the following combinations of six gates: (a) SL 1-1, 1-2, 1-3 and SL 18-1, 18-2, 18-3 (repeat 2004 operation), (b) SL 1-1, 1-2, 1-3 and SL 11-1, 11-2, 11-3, or (c) SL 1-1, 1-2, 1-3 and SL 2-1, 2-2, 2-3. The following elements for surface flow bypasses which should be considered during design of any sluiceway enhancements at The Dalles Dam: (1) form an extensive surface flow bypass flow net (surface bypass discharge greater than ∼7% of total project discharge), (2) create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration 3 m/s) to entrain the subject juvenile

  14. A computational geometry approach to pore network construction for granular packings

    Science.gov (United States)

    van der Linden, Joost H.; Sufian, Adnan; Narsilio, Guillermo A.; Russell, Adrian R.; Tordesillas, Antoinette

    2018-03-01

    Pore network construction provides the ability to characterize and study the pore space of inhomogeneous and geometrically complex granular media in a range of scientific and engineering applications. Various approaches to the construction have been proposed, however subtle implementational details are frequently omitted, open access to source code is limited, and few studies compare multiple algorithms in the context of a specific application. This study presents, in detail, a new pore network construction algorithm, and provides a comprehensive comparison with two other, well-established Delaunay triangulation-based pore network construction methods. Source code is provided to encourage further development. The proposed algorithm avoids the expensive non-linear optimization procedure in existing Delaunay approaches, and is robust in the presence of polydispersity. Algorithms are compared in terms of structural, geometrical and advanced connectivity parameters, focusing on the application of fluid flow characteristics. Sensitivity of the various networks to permeability is assessed through network (Stokes) simulations and finite-element (Navier-Stokes) simulations. Results highlight strong dependencies of pore volume, pore connectivity, throat geometry and fluid conductance on the degree of tetrahedra merging and the specific characteristics of the throats targeted by the merging algorithm. The paper concludes with practical recommendations on the applicability of the three investigated algorithms.

  15. Experimental determination of contraction coefficient and velocity ...

    Indian Academy of Sciences (India)

    Jailakshmi Menon

    2018-04-16

    Apr 16, 2018 ... Radial gates are widely used to control the flow in irrigation channels and spillways. Radial gates ... upstream water depth for a vertical sluice gate assuming hydrostatic ... energy loss on the discharge characteristics of vertical.

  16. Causes of Construction Delays in Qatar Construction Projects

    OpenAIRE

    Murat Gunduz; Mohanad H. A. AbuHassan

    2016-01-01

    Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction ...

  17. Constructing Knowledge Societies: New Challenges for Tertiary Education.

    Science.gov (United States)

    Salmi, Jamil

    2003-01-01

    The principal set of challenges facing tertiary education today is that set which links it to the construction of knowledge societies. Governments, the private sector, and the World Bank have specific tasks to perform in meeting these challenges. Countries--depending upon whether or not they are transition economies, low-income countries, or small…

  18. An Environmentally Oriented Constructive Cost Model In Information ...

    African Journals Online (AJOL)

    A model was designed to assist software developers in Nigeria to estimate software effort, duration and cost as a result of the difficulties in understanding the parameters of the traditional Constructive Cost Model II (COCOMO II) , which was designed for a specif ic environment, using Source Lines of Code (SLOC) . Results ...

  19. Construction completion report

    International Nuclear Information System (INIS)

    1990-01-01

    This Construction Completion Report documents the major construction projects at the Waste Isolation Pilot Plant (WIPP) site and related information on contracts, schedules, and other areas which affected construction. This report is not intended to be an exhaustive detailed analysis of construction, but is a general overview and summary of the WIPP construction. 10 refs., 29 figs

  20. Mapping of information and identification of construction waste at project life cycle

    Science.gov (United States)

    Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia

    2018-03-01

    The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.

  1. Industry specific financial distress modeling

    Directory of Open Access Journals (Sweden)

    Naz Sayari

    2017-01-01

    Full Text Available This study investigates uncertainty levels of various industries and tries to determine financial ratios having the greatest information content in determining the set of industry characteristics. It then uses these ratios to develop industry specific financial distress models. First, we employ factor analysis to determine the set of ratios that are most informative in specified industries. Second, we use a method based on the concept of entropy to measure the level of uncertainty in industries and also to single out the ratios that best reflect the uncertainty levels in specific industries. Finally, we conduct a logistic regression analysis and derive industry specific financial distress models which can be used to judge the predictive ability of selected financial ratios for each industry. The results show that financial ratios do indeed echo industry characteristics and that information content of specific ratios varies among different industries. Our findings show diverging impact of industry characteristics on companies; and thus the necessity of constructing industry specific financial distress models.

  2. DEVELOPMENT FEATURES OF LEASING RELATIONS IN CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Patimat A. Abdulkhalikova

    2017-01-01

    Full Text Available Abstract. Objectives Leasing, which is an alternative to traditional forms of investment for Russia, is currently among the most effective methods of financing construction organisations. Under conditions of shortage of available financial resources, leasing allows the modernisation of production to be carried out, modern equipment to be used or new production facilities to be opened in the shortest possible time. The purpose of the study is to comprehensively substantiate the specifics of leasing operations in construction and demonstrate its advantages as a tool for financing construction organisations. Methods The theoretical basis of the study was the fundamental provisions of economic, financial and management theory. During the process of research, logical, statistical and comparative analysis methods were used alongside expert evaluation and factor analysis approaches. Results For a leasing company whose purpose is to identify potential risk areas associated with the possibility of exceeding planned costs, it is recommended that a feasibility analysis be carried out prior to forming a loan portfolio. It is established that the transactions of a leasing company with a construction organisation can be presented as a separate investment project with a complex financial structure and a combination of interrelated long-term contracts. It is shown that the standardisation of principles of corporate governance and risk management is capable not only of reducing the susceptibility of a construction organisation to risk, but also of increasing the degree of trust on the part of customers and counterparties. Conclusion The expediency of using leasing in construction is due to the insufficient volume of private funds for the acquisition of equipment, which becomes particularly relevant against the background of rapidly aging facilities of construction organisations. Under conditions of largescale technical re-equipment, in which advanced

  3. AUTOCAD IN THE OPERATIONAL MANAGEMENT OF THE CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Tsareva Marina Vladimirovna

    2016-04-01

    Full Text Available Operational management of the construction is usually based on information analysis systems, which are aimed at the monitoring of working schedule and volumes as consistent with predicated schedules. The result of such systems’ operation is traditional information graphics (diagrams, charts, etc., which provides idea on the current state of the construction site and deviations from the planned settings. The author considers the visualization technology of construction of objects using an image of the situation on the AutoCAD drawings, converted into an interactive format. The article focuses on imperfections of the existing technologies of information support of the managers. The creation of unified IT platform is offered on the basis of CAD for creating an integrated information storage and visualization of the environment using electronic drawings and diagrams. Using interactive methods it is possible to illustrate the condition of almost any part of the construction project using these drawings and diagrams. E-drawings contain the basic information resources - estimates, plans, sections, specifications, technology, construction, etc. necessary for the calculation of indicators. The author proved that implementation of visualization is most efficient in case of electronic drawings in 3D format.

  4. A Toolchain to Produce Correct-by-Construction OCaml Programs

    OpenAIRE

    Filliâtre , Jean-Christophe; Gondelman , Léon; Paskevich , Andrei; Pereira , Mário; Melo De Sousa , Simão

    2018-01-01

    This paper presents a methodology to get correct-by-construction OCaml programs using the Why3 tool. First, a formal behavioral specification is given in the form of an OCaml module signature extended with type invariants and function contracts, in the spirit of JML. Second, an implementation is written in the programming language of Why3 and then verified with respect to the specification. Finally, an OCaml program is obtained by an automated translation. Our methodology is illustrated with ...

  5. Empirical Test Case Specification

    DEFF Research Database (Denmark)

    Kalyanova, Olena; Heiselberg, Per

    This document includes the empirical specification on the IEA task of evaluation building energy simulation computer programs for the Double Skin Facades (DSF) constructions. There are two approaches involved into this procedure, one is the comparative approach and another is the empirical one. I....... In the comparative approach the outcomes of different software tools are compared, while in the empirical approach the modelling results are compared with the results of experimental test cases....

  6. Construction of a DNA library representing 15q11-13 by subtraction of two flow sorted marker chromosome-specific libraries

    Energy Technology Data Exchange (ETDEWEB)

    Blennow, E.; Werelius, B.; Nordenskjoeld, M. [Karolinska Hospital, Stockholm (Sweden)] [and others

    1994-09-01

    Constitutional extra {open_quotes}marker chromosomes{close_quotes} are found in {approx}0.5/1000 of newborns. Of these, 50% are inverted duplications of the pericentromeric region of chromosome 15, including two variants; (1) inv dup(15)(pter{yields}q11:q11{yields}pter) and (2) inv dup(15) (pter{yields}q12-13::q12-13{yields}pter). Variant (1) is found in phenotypically normal individuals, whereas variant (2) will produce a typical clinical picture including mental retardation, autism, hyperactivity and discrete dysmorphic features. Fluorescence in situ hybridization (FISH) using single copy probes from the Prader-Willi region confirms these observations as well as chromosome painting using a flow-sorted marker chromosome-specific library from a variant (1) marker, hybridized to the chromosomes of a patient with a variant (2) marker chromosome. Followingly, a flow-sorted biotinylated variant (1) library was subtracted from a non-labeled variant (2) library using magnetic beads and subsequent amplification by degenerate oligonucleotide-primed PCR (DOP-PCR). The successful result was demonstrated by using the amplified material for chromosome painting on chromosome slides from variant (1) and variant (2) patients. We have constructed a library from 15q11-13. This region contains genes producing a specific abnormal phenotype when found in a tri- or tetrasomic state. The region also contains the genes responsible for the Prader-Willi and Angelman syndromes when the paternal/maternal copy is missing, respectively. It is therefore a region where parental imprinting plays an important role. The isolated library may be used to isolate single copy clones which will allow further investigations of this region.

  7. On the use of specific signal types in hearing research

    NARCIS (Netherlands)

    Kohlrausch, A.G.; Par, van de S.L.J.D.E.; Kurtz, T.; Parlitz, U.; Kaatze, U.

    2007-01-01

    In this contribution, we review a number of specific signal types that have been introduced in auditory research in the past 20 years. Through the introduction of digital computers into experimental and theoretical hearing research, the freedom to construct and use specific acoustic stimuli in

  8. Research on Construction Optimization of Three-Connected-Arch Hydraulic Underground Cavities Considering Creep Property

    Directory of Open Access Journals (Sweden)

    Bao-yun Zhao

    2014-01-01

    Full Text Available In order to prevent the creep of surrounding rock in long-term construction, with consideration of different construction methods and other factors during the construction of large-scale underground cavity, three different construction schemes are designed for specific projects and a nonlinear viscoelastic-plastic creep model which can describe rock accelerated creeping is introduced and applied to construction optimization calculation of the large-scale three-connected-arch hydraulic underground cavity through secondary development of FLAC3D. The results show that the adoption of middle cavity construction method, the second construction method, enables the maximum vault displacement of 16.04 mm. This method results in less stress redistribution and plastic zone expansion to the cavity’s surrounding rock than the other two schemes, which is the safest construction scheme. The conclusion can provide essential reference and guidance to similar engineering for construction optimization.

  9. Effects of organizational complexity and resources on construction site risk.

    Science.gov (United States)

    Forteza, Francisco J; Carretero-Gómez, Jose M; Sesé, Albert

    2017-09-01

    Our research is aimed at studying the relationship between risk level and organizational complexity and resources on constructions sites. Our general hypothesis is that site complexity increases risk, whereas more resources of the structure decrease risk. A Structural Equation Model (SEM) approach was adopted to validate our theoretical model. To develop our study, 957 building sites in Spain were visited and assessed in 2003-2009. All needed data were obtained using a specific tool developed by the authors to assess site risk, structure and resources (Construction Sites Risk Assessment Tool, or CONSRAT). This tool operationalizes the variables to fit our model, specifically, via a site risk index (SRI) and 10 organizational variables. Our random sample is composed largely of small building sites with general high levels of risk, moderate complexity, and low resources on site. The model obtained adequate fit, and results showed empirical evidence that the factors of complexity and resources can be considered predictors of site risk level. Consequently, these results can help companies, managers of construction and regulators to identify which organizational aspects should be improved to prevent risks on sites and consequently accidents. Copyright © 2017 National Safety Council and Elsevier Ltd. All rights reserved.

  10. 29 CFR 4.116 - Contracts for construction activity.

    Science.gov (United States)

    2010-07-01

    ... McNamara-O'Hara Service Contract Act Specific Exclusions § 4.116 Contracts for construction activity. (a... McNamara-O'Hara Service Contract Act indicates that the purpose of the provision is to avoid overlapping coverage of the two acts by excluding from the application of the McNamara-O'Hara Act those contracts to...

  11. Design and construction of the Fuels and Materials Examination Facility

    International Nuclear Information System (INIS)

    Burgess, C.A.

    1979-01-01

    Final design is more than 85 percent complete on the Fuels and Materials Examination Facility, the facility for post-irradiation examination of the fuels and materials tests irradiated in the FFTF and for fuel process development, experimental test pin fabrication and supporting storage, assay, and analytical chemistry functions. The overall facility is generally described with specific information given on some of the design features. Construction has been initiated and more than 10% of the construction contracts have been awarded on a fixed price basis

  12. Sustainable construction: construction and demolition waste reconsidered.

    Science.gov (United States)

    del Río Merino, Mercedes; Izquierdo Gracia, Pilar; Weis Azevedo, Isabel Salto

    2010-02-01

    Construction activity in Europe has increased substantially in the past decade. Likewise, there has also been a commensurate rise in the generation of construction and demolition waste (C&DW). This, together with the fact that in many European countries the rate of recycling and reuse of C&DW is still quite low has engendered a serious environmental problem and a motivation to develop strategies and management plans to solve it. Due to its composition, there is a significant potential to reuse and/or recycle C&DW, and thereby, contribute to improving the sustainability of construction and development, but practical procedures are not yet widely known or practiced in the construction industry. This article (a) summarizes the different applications that are presently practiced to optimize the recovery and/or application of C&DW for reuse, and (b) proposes various measures and strategies to improve the processing of this waste. The authors suggest that to enhance environmental effectiveness, a conscious and comprehensive C&DW management plan should be implemented in each jurisdiction. More precisely, this study presents a holistic approach towards C&DW management, through which environmental benefits can be achieved through the application of new construction methods that can contribute to sustainable growth.

  13. Waste compatibility assessments to support project W-320

    International Nuclear Information System (INIS)

    BLAAK, T.M.

    1999-01-01

    The intent of this internal memo is to provide a recommendation for the transfer of tank 241-C-106 waste, Attachment 2, to tank 241-AY-102. This internal memo also identifies additional requirements which have been deemed necessary for safely receiving and storing the waste documented in Attachment 2 from tank 241-C-106 in tank 241-AY-102. This waste transfer is planned in support of tank 241-C-106 solids sluicing activities. Approximately 200,000 gallons of waste and flush water are expected to be pumped from tank 241-C-106 into tank 241-AY-102. Several transfers will be necessary to complete the sluicing of tank 241-C-106 solids. To assure ourselves that this waste transfer will not create any compatibility concerns, a waste compatibility assessment adhering to current waste compatibility requirements has been performed

  14. Support to design and construction of the PBMR plant

    International Nuclear Information System (INIS)

    Cazorla, F.; Moron, P.; Gonzalez, J. I.

    2010-01-01

    Developing the new reactor design to a licensable state for constructing a pilot plant is a tough task require specific resources, concerning knowledge and previous experience, which trespassing the pure scientific or technologic knowledge linked to the reactor conceptual design. Taking into consideration the experience derived from the collaboration between the South African company PBMR (PTY) Ltd.; the Pebble Bed Modular Reactor Designer, and Tecnatom SA, the article presents some of the aspects in which the companies or organization in charge of the design can demand external support to license and construct the pilot plants with guaranteed success. (Author)

  15. Construction of an Unmarked Zymomonas mobilis Mutant Using a Site-Specific FLP Recombinase

    Directory of Open Access Journals (Sweden)

    Shao-Lan Zou

    2012-01-01

    Full Text Available Flippase expression was carried out in Zymomonas mobilis strain ZM4. The FRT-flanked selection marker gene was first integrated into the ZM4 chromosome by homologous recombination. The Saccharomyces cerevisiae flp gene was then introduced under the control of the ZM4 gap gene promoter (Pgap, encoding glyceraldehyde-3-phosphate dehydrogenase or the λ bacteriophage cI857-pR contained in the broad-host-range cloning vector pBBR1-MCS-2. This study demonstrated that flp was expressed and that the deletion frequency of the FRT-flanked marker gene was very high (approx. 100 %. In addition, the flp gene expression vector could be conveniently removed from the resulting unmarked Z. mobilis mutants by serially transferring the cells three times into antibiotic-free medium, thereby establishing an efficient method for constructing unmarked Z. mobilis mutants.

  16. Fiber Reinforced Concrete (FRC) for High Rise Construction: Case Studies

    Science.gov (United States)

    Gharehbaghi, Koorosh; Chenery, Rhea

    2017-12-01

    Due to its material element, Fiber Reinforced Concrete (FRC) could be stronger than traditional Concrete. This is due to FRC internal material compounds and elements. Furthermore, FRC can also significantly improve flexural strength when compared to traditional Concrete. This improvement in flexural strength can be varied depending on the actual fibers used. Although not new, FRC is gradually gaining popularity in the construction industry, in particular for high rise structures. This is due to its flexural strength, especially for high seismic zones, as it will provide a better solution then reinforced Concrete. The main aim of this paper is to investigate the structural importance of FRC for the high rise construction. Although there has been numerous studies and literature in justifying the FRC for general construction; this paper will consider its use specifically for high rise construction. Moreover, this paper will closely investigate eight case studies from Australian and United States as a part of the FRC validation for high rise construction. In doing so, this paper will examine their Structural Health Monitoring (SHM) to determine their overall structural performance.

  17. Construction and mounting technology of NPP in France

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    Principal peculiarities of construction sequence of building 1300 MW(e) single-unit NPPs in France are described. A NPP is housed in a two-layer containment building with 1.5% leakage of medium per day. The internal shell, 900 mm thich, is made of prestressed reinforced concrete; the external shell is made of reinforced concrete. The sequence and organizing of concrete operations using concrete pumps with capacity of 50 m 3 /h, concrete distributors ensuring concrete delivery to a distance of 46 m and belt conveyers assuring 80-100 m 3 /h concrete placing are described. A concrete plant of 120-180 μ 3 /h productive capacity equipped with a system for computerized automatic programming of the mixture composition is built to provide concrete mixture for NPP construction sites. The workshops are developed at the construction site to fabricate concrete structures with specific reinforcement consumption up to 250 kg/m 3 . The reinforcement is assembled with the use of special pipe couplings, welding of reinforcement is prohibited. Enlarged reinforced concrete blocks sized up to 250 t are employed to reduce the construction terms and to improve the quality of work

  18. High plastic concrete temperature specifications for paving mixtures.

    Science.gov (United States)

    2011-08-01

    This report documents a study performed for the Illinois Department of Transportation (IDOT) regarding : concrete roadway construction in hot weather. The main objective in this project is to develop improved : specifications and procedures with resp...

  19. Barriers of lean construction implementation in the Moroccan construction industry

    Science.gov (United States)

    Bajjou, Mohamed Saad; Chafi, Anas

    2018-04-01

    Improving the production system performance has become a fundamental pillar that must be taken into consideration in the construction industry. Recent developments in the construction sector have led to renewed interest in new techniques of management. Lean Construction is a very effective approach that has gained a high popularity by its ability to eliminate waste and maximize the value for the customer. Although both developed and developing countries have gained large benefits by implementing Lean Construction approach, several experiences showed many barriers that are hindering its implementation especially in developing countries. This paper aims to assess the critical barriers to the successful implementation in the Moroccan construction industry. Based on a literature review, followed by an analysis of data collected from a questionnaire survey which targeted 330 practitioners in the Moroccan construction field, several barriers were identified as key barriers. The findings of this investigation revealed that there are significant barriers such as Lack of knowledge about Lean Construction concepts, Unskilled Human Resources, and insufficient financial resources.

  20. Prefabrication in Building Construction: A Perspective of Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Nafees Ahmed Memon

    2014-07-01

    Full Text Available Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight method as a MCDM approach. The results depict that main advantages of prefabrication are ?Shorter construction time? and ?Less construction site waste?. The top hindrances in adopting prefabrication as identified in this study are: ?Higher initial construction cost? and ?Inflexible for design changes?. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan

  1. Prefabrication in building construction: a perspective of pakistan construction industry

    International Nuclear Information System (INIS)

    Memon, N.A.; Memon, F.A.; Khehro, S.H.

    2014-01-01

    Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight) method as a MCDM approach. The results depict that main advantages of prefabrication are Shorter construction time and Less construction site waste. The top hindrances in adopting prefabrication as identified in this study are: Higher initial construction cost and Inflexible for design changes. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan. (author)

  2. Multiloop Integral System Test (MIST): MIST Facility Functional Specification

    International Nuclear Information System (INIS)

    Habib, T.F.; Koksal, C.G.; Moskal, T.E.; Rush, G.C.; Gloudemans, J.R.

    1991-04-01

    The Multiloop Integral System Test (MIST) is part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox designed plants. MIST is sponsored by the US Nuclear Regulatory Commission, the Babcock ampersand Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral facilities to address the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility -- the Once Through Integral System (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST Functional Specification documents as-built design features, dimensions, instrumentation, and test approach. It also presents the scaling basis for the facility and serves to define the scope of work for the facility design and construction. 13 refs., 112 figs., 38 tabs

  3. The use of constructed wetlands for the treatment of industrial wastewater

    Directory of Open Access Journals (Sweden)

    Skrzypiecbcef Katarzyna

    2017-09-01

    Full Text Available Constructed wetlands are characterized by specific conditions enabling simultaneous various physical and biochemical processes. This is the result of specific environment for the growth of microorganisms and hydrophytes (aquatic and semiaquatic plants which are capable of living in aerobic, anaerobic and facultative anaerobic conditions. Their interaction contributes to the intensification of oxidation and reduction responsible for the removal and retention of pollutants. These processes are supported by sorption, sedimentation and assimilation. Thanks to these advantages, treatment wetland systems have been used in communal management for over 50 years. In recent years, thanks to its advantages, low operational costs and high removal efficiency, there is growing interest in the use of constructed wetlands for the treatment or pre-treatment of various types of industrial wastewater. The study analyzes current use of these facilities for the treatment of industrial wastewater in the world. The conditions of use and efficiency of pollutants removal from readily and slowly biodegradable wastewater, with special emphasis on specific and characteristic pollutants of particular industries were presented. The use of subsurface horizontal flow beds for the treatment of industrial wastewater, among others from crude oil processing, paper production, food industry including wineries and distillery, olive oil production and coffee processing was described. In Poland constructed wetlands are used for the treatment of sewage and sludge from milk processing in pilot scale or for dewatering of sewage sludge produced in municipal wastewater treatment plant treating domestic sewage with approximately 40% share of wastewater from dairy and fish industry. In all cases, constructed wetlands provided an appropriate level of treatment and in addition the so-called ecosystem service.

  4. Case inflection of construct state constructions in Dinka

    DEFF Research Database (Denmark)

    Andersen, Torben

    2016-01-01

    Dinka, a Nilo-Saharan language, is largely monosyllabic, but nevertheless it has a fairly rich morphology. Thus, most of its morphology is expressed by alternations in phonological material of the root. The inflectional categories of nouns manifested in this way include state and case in addition...... to number. The state category consists of an absolute state and two construct states. The case category includes a nominative, a genitive, an allative, and an essive/ablative. The present article shows how case inflection is manifested in complex noun phrases consisting of a noun in a construct state...... simultaneously carry state information and case information. Thus, the case inflection of construct state constructions in Dinka adds yet another layer of nonlinear morphology to nouns in this language....

  5. Woman in the Making: The Impact of the Constructed Campus Environment of Xavier University of Louisiana on the Construction of Black Womanhood

    Science.gov (United States)

    Njoku, Nadrea R.

    2017-01-01

    This study explores the experiences of African American women as students at Xavier University of Louisiana (XULA). This study specifically focuses on how these women's experiences at their HBCU facilitated their construction of Black womanhood. This study did not aim to compare, contrast, or situate the experiences of African American women…

  6. How Do DSM-5 Personality Traits Align With Schema Therapy Constructs?

    Science.gov (United States)

    Bach, Bo; Lee, Christopher; Mortensen, Erik Lykke; Simonsen, Erik

    2016-08-01

    DSM-5 offers an alternative model of personality pathology that includes 25 traits. Although personality disorders are mostly treated with psychotherapy, the correspondence between DSM-5 traits and concepts in evidence-based psychotherapy has not yet been evaluated adequately. Suitably, schema therapy was developed for treating personality disorders, and it has achieved promising evidence. The authors examined associations between DSM-5 traits and schema therapy constructs in a mixed sample of 662 adults, including 312 clinical participants. Associations were investigated in terms of factor loadings and regression coefficients in relation to five domains, followed by specific correlations among all constructs. The results indicated conceptually coherent associations, and 15 of 25 traits were strongly related to relevant schema therapy constructs. Conclusively, DSM-5 traits may be considered expressions of schema therapy constructs, which psychotherapists might take advantage of in terms of case formulation and targets of treatment. In turn, schema therapy constructs add theoretical understanding to DSM-5 traits.

  7. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  8. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  9. Construct validity of the ovine model in endoscopic sinus surgery training.

    Science.gov (United States)

    Awad, Zaid; Taghi, Ali; Sethukumar, Priya; Tolley, Neil S

    2015-03-01

    To demonstrate construct validity of the ovine model as a tool for training in endoscopic sinus surgery (ESS). Prospective, cross-sectional evaluation study. Over 18 consecutive months, trainees and experts were evaluated in their ability to perform a range of tasks (based on previous face validation and descriptive studies conducted by the same group) relating to ESS on the sheep-head model. Anonymized randomized video recordings of the above were assessed by two independent and blinded assessors. A validated assessment tool utilizing a five-point Likert scale was employed. Construct validity was calculated by comparing scores across training levels and experts using mean and interquartile range of global and task-specific scores. Subgroup analysis of the intermediate group ascertained previous experience. Nonparametric descriptive statistics were used, and analysis was carried out using SPSS version 21 (IBM, Armonk, NY). Reliability of the assessment tool was confirmed. The model discriminated well between different levels of expertise in global and task-specific scores. A positive correlation was noted between year in training and both global and task-specific scores (P variable, and the number of ESS procedures performed under supervision had the highest impact on performance. This study describes an alternative model for ESS training and assessment. It is also the first to demonstrate construct validity of the sheep-head model for ESS training. © 2014 The American Laryngological, Rhinological and Otological Society, Inc.

  10. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  11. Usability Constructs

    DEFF Research Database (Denmark)

    Hertzum, Morten; Clemmesen, Torkil; Hornbæk, Kasper Anders Søren

    2007-01-01

    Whereas research on usability predominantly employs universal definitions of the aspects that comprise usability, people experience their use of information systems through personal constructs. Based on 48 repertory-grid interviews, this study investigates how such personal constructs are affected...... use of constructs traditionally associated with usability (e.g., easy-to-use, intuitive, and liked). Further analysis of the data is ongoing...

  12. Study on the Quality Management of Building Electricity Engineering Construction in the Whole Process

    Science.gov (United States)

    Qin, Minwu

    2018-05-01

    With the progress of science and technology, people use more and more types of electrical equipment and the functions are more and more complicated, which put forward higher requirements on the construction quality of electrical construction. If you ignore some of the necessary quality requirements and violate the specification of operation in the process of building electrical construction, that will bring great security risks and resulting in huge economic losses, even endanger personal safety. Manage and control construction quality of building electrical construction must be carried out throughout the whole process of construction. According to the construction characteristics of building electrical construction, this article analyze the construction details that are easy to be ignored but very important in the construction, based on management theory and put forward the methods of quality management in the whole process of building electrical construction. This template explains and demonstrates how to prepare your camera-ready paper for Trans Tech Publications. The best is to read these instructions and follow the outline of this text.

  13. Construct validity of the items on the Stroke Specific Quality of Life (SS-QOL) questionnaire that evaluate the participation component of the International Classification of Functioning, Disability and Health.

    Science.gov (United States)

    Silva, Soraia Micaela; Corrêa, Fernanda Ishida; Pereira, Gabriela Santos; Faria, Christina Danielli Coelho de Morais; Corrêa, João Carlos Ferrari

    2018-01-01

    Analyze the construct validity and internal consistency of the Stroke Specific Quality of Life (SS-QOL) items that address the participation component of the ICF as well as analyze the ceiling and floor effects. One hundred subjects were analyzed: 85 community-dwelling and 15 institutionalized individuals. The analysis of construct validity was performed using classic psychometrics: (1) the comparison of known groups (individuals without restriction to participation vs. those with restriction to participation) using the Mann-Whitney test and (2) convergent validity - correlation between the scores on the SS-QOL items that address participation and the subscale scores of measures used to evaluate the similar constructs and concepts [the Short-Form Health Survey (SF-36), Functional Independence Measure (FIM) and grip strength test]. Spearman's correlation coefficients were calculated for this analysis. Cronbach's α was used for the analysis of internal consistency and both the ceiling and floor effects were analyzed. The level of significance for all analyses was α = 0.05. The a priori hypotheses regarding construct validity were partially demonstrated, as only five of the eight domains exhibited positive moderate to strong correlations (r > 0.40) with measures that address constructs similar to those addressed on the SS-QOL questionnaire. The items demonstrated adequate internal consistency and are capable of differentiating individuals with and without restriction to participation. The ceiling and floor effects were considered adequate for the total SS-QOL score, but beyond acceptable standards for some domains. The 26 items of the SS-QOL questionnaire measure a multidimensional construct and therefore do not only address participation. However, the items demonstrated adequate internal consistency and are capable of differentiating individuals with and without restriction to participation. Implications for rehabilitation The 26 items of the SS

  14. Is Acculturation a Dynamic Construct?: The Influence of Method of Priming Culture on Acculturation

    Science.gov (United States)

    Lechuga, Julia

    2008-01-01

    Recent evidence suggests that culture is a dynamic construct activated in response to cues encountered in a given situation. Research on acculturation indicates that this is a complex construct that might be domain specific. Two studies were undertaken to investigate the effect of two ways of priming culture on acculturation and enculturation…

  15. Design and modeling of reservoir operation strategies for sediment management

    NARCIS (Netherlands)

    Sloff, C.J.; Omer, A.Y.A.; Heynert, K.V.; Mohamed, Y.A.

    2015-01-01

    Appropriate operation strategies that allow for sediment flushing and sluicing (sediment routing) can reduce rapid storage losses of (hydropower and water-supply) reservoirs. In this study we have shown, using field observations and computational models, that the efficiency of these operations

  16. Cell-specific targeting by heterobivalent ligands.

    Science.gov (United States)

    Josan, Jatinder S; Handl, Heather L; Sankaranarayanan, Rajesh; Xu, Liping; Lynch, Ronald M; Vagner, Josef; Mash, Eugene A; Hruby, Victor J; Gillies, Robert J

    2011-07-20

    Current cancer therapies exploit either differential metabolism or targeting to specific individual gene products that are overexpressed in aberrant cells. The work described herein proposes an alternative approach--to specifically target combinations of cell-surface receptors using heteromultivalent ligands ("receptor combination approach"). As a proof-of-concept that functionally unrelated receptors can be noncovalently cross-linked with high avidity and specificity, a series of heterobivalent ligands (htBVLs) were constructed from analogues of the melanocortin peptide ligand ([Nle(4), dPhe(7)]-α-MSH) and the cholecystokinin peptide ligand (CCK-8). Binding of these ligands to cells expressing the human Melanocortin-4 receptor and the Cholecystokinin-2 receptor was analyzed. The MSH(7) and CCK(6) were tethered with linkers of varying rigidity and length, constructed from natural and/or synthetic building blocks. Modeling data suggest that a linker length of 20-50 Å is needed to simultaneously bind these two different G-protein coupled receptors (GPCRs). These ligands exhibited up to 24-fold enhancement in binding affinity to cells that expressed both (bivalent binding), compared to cells with only one (monovalent binding) of the cognate receptors. The htBVLs had up to 50-fold higher affinity than that of a monomeric CCK ligand, i.e., Ac-CCK(6)-NH(2). Cell-surface targeting of these two cell types with labeled heteromultivalent ligand demonstrated high avidity and specificity, thereby validating the receptor combination approach. This ability to noncovalently cross-link heterologous receptors and target individual cells using a receptor combination approach opens up new possibilities for specific cell targeting in vivo for therapy or imaging.

  17. ESTIMATING INJURIOUS IMPACT IN CONSTRUCTION LIFE CYCLE ASSESSMENTS: A PROSPECTIVE STUDY

    Directory of Open Access Journals (Sweden)

    McDevitt, James E.

    2012-04-01

    Full Text Available This paper is the result of a desire to include social factors alongside environmental and economic considerations in Life Cycle Assessment studies for the construction sector. We describe a specific search for a method to include injurious impact for construction Life Cycle Assessment studies, by evaluating a range of methods and data sources. A simple case study using selected Accident Compensation Corporation information illustrates that data relating to injury could provide a compelling evidence to cause changes in construction supply chains, and could provide an economic motive to pursue further research in this area. The paper concludes that limitations notwithstanding, the suggested approach could be useful as a fast and cheap high level tool that can accelerate the discussions and research agenda that will bring about the inclusion of social metrics in construction sector supply chain management and declarations.

  18. Optimizing strategy for repetitive construction projects within multi-mode resources

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of a contractor’s view such as: proposed project duration with corresponding gross value and cash flows. Cash flow analysis of construction projects has a long history and has been an important topic in construction management. Determination of project cash flows is very sensitive, especially for repetitive construction projects. This paper focuses on how to calculate tender data for repetitive construction projects such as: project duration, project cost, project/bid price, project cash flows, project maximum working capital and project net present value that is equivalent to net profit at the beginning of the project. A simplified multi-objective optimization formulation will be presented that creates best tender data to contractor comparing with more feasible options that are generated from multi-mode resources in a given project. This mathematical formulation is intended to give more scenarios which provide a practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price and project maximum working capital while maximizing its net present value simultaneously. At the end of the paper, an illustrative example will be presented to demonstrate the applications of proposed technique to an optimization expressway of repetitive construction project.

  19. In nuclear civil construction, France benefits from a leading know-how and expertise

    International Nuclear Information System (INIS)

    Martin, F.

    2016-01-01

    EGIS is an enterprise that has been a partner for EDF and AREVA since the construction of the first nuclear power plant in France at Fessenheim in 1970. EGIS has a global competency for nuclear civil construction from design to the follow-up of the work. EGIS has taken part into the construction of the 3 first EPR in France, Finland and China and into the implementation of post-Fukushima measures in operating nuclear power plants. EGIS has developed a specific know-how for managing the seismic risk. (A.C.)

  20. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Science.gov (United States)

    2013-03-26

    ...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...

  1. Essential Specification Elements for Heat Exchanger Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Bower, L.

    2015-07-01

    Performance upgrade and equipment degradation are the primary impetuses for a nuclear power plant to engage in the large capital cost project of heat exchanger replacement. Along with attention to these issues, consideration of heat exchanger Codes and Standards, material improvements, thermal redesign, and configuration are essential for developing User’s Design Specifications for successful replacement projects. The User’s Design Specification is the central document in procuring ASME heat exchangers. Properly stated objectives for the heat exchanger replacement are essential for obtaining the materials, configurations and thermal designs best suited for the nuclear power plant. Additionally, the code of construction required and the applied manufacturing standard (TEMA or HEI) affects how the heat exchanger may be designed or configured to meet the replacement goals. Knowledge of how Codes and Standards affect design and configuration details will aid in writing the User’s Design Specification. Joseph Oat Corporation has designed and fabricated many replacement heat exchangers for the nuclear power industry. These heat exchangers have been constructed per ASME Section III to various Code-Years or ASME Section VIII-1 to the current Code-Year also in accordance with TEMA and HEI. These heat exchangers have been a range of like-for-like replacement to complete thermal, material and configuration redesigns. Several examples of these heat exchangers with their Code, Standard and specification implications are presented. (Author.

  2. Vascularization of soft tissue engineering constructs

    DEFF Research Database (Denmark)

    Pimentel Carletto, Rodrigo

    with mechanical properties in the range of soft tissues has not been fully achieved. My project focused on the fabrication and the active perfusion of hydrogel constructs with multi-dimensional vasculature and controlled mechanical properties targeting soft tissues. Specifically, the initial part of the research...... nanotechnology-based paradigm for engineering vascularised liver tissue for transplantation”) and the Danish National Research Foundation and Villum Foundation’s Center for Intelligent Drug delivery and sensing Using microcontainers and Nanomechanics (Danish National Research Foundation (DNRF122)....

  3. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    Directory of Open Access Journals (Sweden)

    Ngah Nasaruddin Nur Ain

    2016-01-01

    Full Text Available Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. Literature work found that 11 leadership qualities to ensure construction project success. From the frequency analysis, five most dominant leadership qualities are team building, communication skill, visioning, planning & strategy skill, and decision making. Beside the literature, this study also seeks an opinion from a senior leader of a successful construction company regarding the need of these qualities amongst parties to resolve the construction issues. The results from an interview session indicate that he fully agreed with the need of all the qualities in the construction industry. This shows that there is a strong relationship between solving the issues with the leadership quality in ensuring construction project success. These qualities should be further investigated to acquire a better representation of leadership quality in resolving construction issues for Malaysia construction industry.

  4. Specific Visualization of Tumor Cells Using Upconversion Nanophosphors

    Science.gov (United States)

    Grebenik, E. A.; Generalova, A. N.; Nechaev, A. V.; Khaydukov, E.V.; Mironova, K. E.; Stremovskiy, O. A.; Lebedenko, E.N.; Zvyagin, A. V.; Deyev, S. M.

    2014-01-01

    The development of targeted constructs on the basis of photoluminescent nanoparticles with a high photo- and chemical stability and absorption/emission spectra in the “transparency window” of biological tissues is an important focus area of present-day medical diagnostics. In this work, a targeted two-component construct on the basis of upconversion nanophosphors (UCNPs) and anti-tumor 4D5 scFv was developed for selective labeling of tumor cells overexpressing the HER2 tumor marker characteristic of a number of human malignant tumors. A high affinity barnase : barstar (Bn : Bs) protein pair, which exhibits high stability in a wide range of pH and temperatures, was exploited as a molecular adapter providing self-assembly of the two-component construct. High selectivity for the binding of the two-component 4D5 scFv-Bn : UCNP-Bs construct to human breast adenocarcinoma SK-BR-3 cells overexpressing HER2 was demonstrated. This approach provides an opportunity to produce similar constructs for the visualization of different specific markers in pathogenic tissues, including malignant tumors. PMID:25558394

  5. 49 CFR 179.4 - Changes in specifications for tank cars.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Changes in specifications for tank cars. 179.4... TANK CARS Introduction, Approvals and Reports § 179.4 Changes in specifications for tank cars. (a...—Tank Car Safety, AAR, for consideration by its Tank Car Committee. An application for construction of...

  6. The BETA ® nursing measure: Calibrating construct validity with ...

    African Journals Online (AJOL)

    Background: The BETA nursing measure has been introduced as a tool to routinely measure and monitor the outcomes of patients' activities of daily living in a restorative nursing care context. Objectives: To investigate the BETA's construct validity using the Rasch model with specific reference to the BETA's potential to be ...

  7. Social constructions of gender roles, gender-based violence and ...

    African Journals Online (AJOL)

    The links between gender roles, gender-based violence and HIV/AIDS risk are complex and culturally specific. In this qualitative study we investigated how women and men in two black communities in the Western Cape, South Africa, constructed their gender identities and roles, how they understood gender-based violence ...

  8. Bioprinting of hybrid tissue constructs with tailorable mechanical properties

    Energy Technology Data Exchange (ETDEWEB)

    Schuurman, W; Khristov, V; Pot, M W; Dhert, W J A; Malda, J [Department of Orthopaedics, University Medical Center Utrecht (Netherlands); Van Weeren, P R, E-mail: j.malda@umcutrecht.nl [Faculty of Veterinary Sciences, Department of Equine Sciences, Utrecht University (Netherlands)

    2011-06-15

    Tissue/organ printing aims to recapitulate the intrinsic complexity of native tissues. For a number of tissues, in particular those of musculoskeletal origin, adequate mechanical characteristics are an important prerequisite for their initial handling and stability, as well as long-lasting functioning. Hence, organized implants, possessing mechanical characteristics similar to the native tissue, may result in improved clinical outcomes of regenerative approaches. Using a bioprinter, grafts were constructed by alternate deposition of thermoplastic fibers and (cell-laden) hydrogels. Constructs of different shapes and sizes were manufactured and mechanical properties, as well as cell viability, were assessed. This approach yields novel organized viable hybrid constructs, which possess favorable mechanical characteristics, within the same range as those of native tissues. Moreover, the approach allows the use of multiple hydrogels and can thus produce constructs containing multiple cell types or bioactive factors. Furthermore, since the hydrogel is supported by the thermoplastic material, a broader range of hydrogel types can be used compared to bioprinting of hydrogels alone. In conclusion, we present an innovative and versatile approach for bioprinting, yielding constructs of which the mechanical stiffness provided by thermoplastic polymers can potentially be tailored, and combined specific cell placement patterns of multiple cell types embedded in a wide range of hydrogels. (communication)

  9. Bioprinting of hybrid tissue constructs with tailorable mechanical properties

    International Nuclear Information System (INIS)

    Schuurman, W; Khristov, V; Pot, M W; Dhert, W J A; Malda, J; Van Weeren, P R

    2011-01-01

    Tissue/organ printing aims to recapitulate the intrinsic complexity of native tissues. For a number of tissues, in particular those of musculoskeletal origin, adequate mechanical characteristics are an important prerequisite for their initial handling and stability, as well as long-lasting functioning. Hence, organized implants, possessing mechanical characteristics similar to the native tissue, may result in improved clinical outcomes of regenerative approaches. Using a bioprinter, grafts were constructed by alternate deposition of thermoplastic fibers and (cell-laden) hydrogels. Constructs of different shapes and sizes were manufactured and mechanical properties, as well as cell viability, were assessed. This approach yields novel organized viable hybrid constructs, which possess favorable mechanical characteristics, within the same range as those of native tissues. Moreover, the approach allows the use of multiple hydrogels and can thus produce constructs containing multiple cell types or bioactive factors. Furthermore, since the hydrogel is supported by the thermoplastic material, a broader range of hydrogel types can be used compared to bioprinting of hydrogels alone. In conclusion, we present an innovative and versatile approach for bioprinting, yielding constructs of which the mechanical stiffness provided by thermoplastic polymers can potentially be tailored, and combined specific cell placement patterns of multiple cell types embedded in a wide range of hydrogels. (communication)

  10. Greenhouse Gas Emissions from Excavation on Residential Construction Sites

    Directory of Open Access Journals (Sweden)

    Perry Forsythe

    2014-12-01

    Full Text Available Despite considerable research concerning the manifestation of greenhouse gases in the usage of buildings, little has been done concerning emissions arising from the construction process itself. This paper specifically examines emissions arising from cut and fill excavation on residential construction sites. Even though such excavation is often seen as being economical in terms of providing a flat base for concrete raft slab construction, the environmental consequences of this approach need to be considered more fully in terms of impact on the environment. This is particularly important when steeply sloping sites are involved and for different soil types. The paper undertakes a study that quantitatively assesses the cumulative greenhouse gas emissions caused by cut and fill excavation on 52 residential projects in Australia for a range of slope and soil types. The paper presents results from the study and concludes that greenhouse gas emissions increase as site slope increases; the building footprint area (as distinct from Gross Floor Area, exposes the need to reduce the area of the building to reduce greenhouse gas emissions; excavation of rock soils creates higher emissions than other soil types; and cut and fill excavation on steeply slope sites increase emissions. Potential alternative construction includes suspended floor construction systems which involve less excavation.

  11. Greenhouse Gas Emissions from Excavation on Residential Construction Sites

    Directory of Open Access Journals (Sweden)

    Perry Forsythe

    2014-12-01

    Full Text Available Despite considerable research concerning the manifestation of greenhouse gases in the usage of buildings, little has been done concerning emissions arising from the construction process itself. This paper specifically examines emissions arising from cut and fill excavation on residential construction sites. Even though such excavation is often seen as being economical in terms of providing a flat base for concrete raft slab construction, the environmental consequences of this approach need to be considered more fully in terms of impact on the environment. This is particularly important when steeply sloping sites are involved and for different soil types. The paper undertakes a study that quantitatively assesses the cumulative greenhouse gas emissions caused by cut and fill excavation on 52 residential projects in Australia for a range of slope and soil types. The paper presents results from the study and concludes that greenhouse gas emissions increase as site slope increases; the building footprint area (as distinct from Gross Floor Area, exposes the need to reduce the area of the building to reduce greenhouse gas emissions; excavation of rock soils creates higher emissions than other soil types; and cut and fill excavation on steeply slope sites increase emissions. Potential alternative construction includes suspended floor construction systems which involve less excavation. 

  12. Distributed Virtual Workspace for Enhancing Communication within the Construction Industry - DIVERCITY

    DEFF Research Database (Denmark)

    Sarshar, M.; Christiansson, Per Lennart; Svidt, Kjeld

    should read this? This handbook has been written specifically for construction project leaders and business managers. What can DIVERCITY achieve? n Improved communications with the client; n Design of better facilities; n Improved collaboration and communication across the supply chain.......DIVERCITY allows users to visualise building projects and run computer simulations of various aspects of their performance during the briefing, design and construction phases. In particular, the software enables collaborative working between groups of project stakeholders in separate locations. Who...

  13. Construction and operation costs of constructed wetlands treating wastewater.

    Science.gov (United States)

    Gkika, Dimitra; Gikas, Georgios D; Tsihrintzis, Vassilios A

    2014-01-01

    Design data from nine constructed wetlands (CW) facilities of various capacities (population equivalent (PE)) are used to estimate construction and operation costs, and then to derive empirical equations relating the required facility land area and the construction cost to PE. In addition, comparisons between the costs of CW facilities based on various alternative construction materials, i.e., reinforced concrete and earth structures (covered with either high density polyethylene or clay), are presented in relation to the required area. The results show that earth structures are economically advantageous. The derived equations can be used for providing a preliminary cost estimate of CW facilities for domestic wastewater treatment.

  14. The use of constructed wetlands for the treatment of industrial wastewater

    OpenAIRE

    Skrzypiecbcef Katarzyna; Gajewskaad Magdalena H.

    2017-01-01

    Constructed wetlands are characterized by specific conditions enabling simultaneous various physical and biochemical processes. This is the result of specific environment for the growth of microorganisms and hydrophytes (aquatic and semiaquatic plants) which are capable of living in aerobic, anaerobic and facultative anaerobic conditions. Their interaction contributes to the intensification of oxidation and reduction responsible for the removal and retention of pollutants. These processes are...

  15. Perspectives of construction robots

    Science.gov (United States)

    Stepanov, M. A.; Gridchin, A. M.

    2018-03-01

    This article is an overview of construction robots features, based on formulating the list of requirements for different types of construction robots in relation to different types of construction works.. It describes a variety of construction works and ways to construct new or to adapt existing robot designs for a construction process. Also, it shows the prospects of AI-controlled machines, implementation of automated control systems and networks on construction sites. In the end, different ways to develop and improve, including ecological aspect, the construction process through the wide robotization, creating of data communication networks and, in perspective, establishing of fully AI-controlled construction complex are formulated.

  16. Outcomes of role stress: a multisample constructive replication.

    Science.gov (United States)

    Kemery, E R; Bedeian, A G; Mossholder, K W; Touliatos, J

    1985-06-01

    Responses from four separate samples of accountants and hospital employees provided a constructive replication of the Bedeian and Armenakis (1981) model of the causal nexus between role stress and selected outcome variables. We investigated the relationship between both role ambiguity and role conflict--as specific forms of role stress--and job-related tension, job satisfaction, and propensity to leave, using LISREL IV, a technique capable of providing statistical data for a hypothesized population model, as well as for specific causal paths. Results, which support the Bedeian and Armenakis model, are discussed in light of previous research.

  17. Does level of specificity affect measures of motivation to comply? A randomized evaluation.

    Science.gov (United States)

    Branscum, Paul; Senkowski, Valerie

    2018-05-30

    The theory of planned behavior (TPB) is a popular value-expectancy model in social and behavioral health. Motivation to comply, one of the theory's constructs, has not been well operationalized and measured in the past, and to date, there has been no assessment of whether level of specificity affects the measurement of the construct. The purpose of this study was to measure the motivation to comply construct across four domains (from general to TACT-behavior specific) and evaluate the potential impact the differences have when identifying determinants of generalized injunctive norms. Students (n = 234) attending a large southwestern university completed a TPB survey related to sleep and physical activity, and were randomized to one of four domains that measured motivation to comply (General domain, n = 58; Health domain, n = 60; Behavioral domain, n = 56; and TACT domain, n = 60). Across both behaviors, motivation to comply measurements did not appear to be affected by changing the level of specificity. Referents for sleep and physical activity were mostly significant, but the effects were small to medium. Future researchers should consider removing motivation to comply measures from TPB surveys to reduce respondent burden or find alternative ways of measuring the construct.

  18. Predictive value and construct validity of the work functioning screener-healthcare (WFS-H)

    Science.gov (United States)

    Boezeman, Edwin J.; Nieuwenhuijsen, Karen; Sluiter, Judith K.

    2016-01-01

    Objectives: To test the predictive value and convergent construct validity of a 6-item work functioning screener (WFS-H). Methods: Healthcare workers (249 nurses) completed a questionnaire containing the work functioning screener (WFS-H) and a work functioning instrument (NWFQ) measuring the following: cognitive aspects of task execution and general incidents, avoidance behavior, conflicts and irritation with colleagues, impaired contact with patients and their family, and level of energy and motivation. Productivity and mental health were also measured. Negative and positive predictive values, AUC values, and sensitivity and specificity were calculated to examine the predictive value of the screener. Correlation analysis was used to examine the construct validity. Results: The screener had good predictive value, since the results showed that a negative screener score is a strong indicator of work functioning not hindered by mental health problems (negative predictive values: 94%-98%; positive predictive values: 21%-36%; AUC:.64-.82; sensitivity: 42%-76%; and specificity 85%-87%). The screener has good construct validity due to moderate, but significant (pvalue and good construct validity. Its score offers occupational health professionals a helpful preliminary insight into the work functioning of healthcare workers. PMID:27010085

  19. Predictive value and construct validity of the work functioning screener-healthcare (WFS-H).

    Science.gov (United States)

    Boezeman, Edwin J; Nieuwenhuijsen, Karen; Sluiter, Judith K

    2016-05-25

    To test the predictive value and convergent construct validity of a 6-item work functioning screener (WFS-H). Healthcare workers (249 nurses) completed a questionnaire containing the work functioning screener (WFS-H) and a work functioning instrument (NWFQ) measuring the following: cognitive aspects of task execution and general incidents, avoidance behavior, conflicts and irritation with colleagues, impaired contact with patients and their family, and level of energy and motivation. Productivity and mental health were also measured. Negative and positive predictive values, AUC values, and sensitivity and specificity were calculated to examine the predictive value of the screener. Correlation analysis was used to examine the construct validity. The screener had good predictive value, since the results showed that a negative screener score is a strong indicator of work functioning not hindered by mental health problems (negative predictive values: 94%-98%; positive predictive values: 21%-36%; AUC:.64-.82; sensitivity: 42%-76%; and specificity 85%-87%). The screener has good construct validity due to moderate, but significant (ppredictive value and good construct validity. Its score offers occupational health professionals a helpful preliminary insight into the work functioning of healthcare workers.

  20. Shortening of construction period of nuclear power plant. Activities of construction industry on construction period shortening

    International Nuclear Information System (INIS)

    Kamata, Hirofumi

    2011-01-01

    Total construction period could be shorten by prefabricating structures efficiently in another yard and reducing working hours on site, which would reduce work at height or congestion work and also upgrade safety at work. Construction period shortening would surely reduce expenses during work and advance operation start of electric utilities. Construction of reactor building, turbine building, water intake and drainage canal was performed on a relatively large scale and a big share of whole schedule. This article summarized basic technologies to shorten construction period for reactor building/turbine building and water intake and drainage canal. Advanced methods of reactor building/turbine building; (1) modularization of equipment and skeleton, (2) utilization of concrete mold, reinforcing bar and steel frame, (3) precedent steel frame method and (4) steel plate reinforced concrete (SC) method, were outlined and their application examples were shown to reduce work on site and improve work efficiency. As for water intake and drainage canal construction, (1) precast concrete method, (2) SC method and (3) steel plate shell method were described with application examples. Construction procedures and problems using mega block method for water intake and drainage canal were also introduced. (T. Tanaka)