WorldWideScience

Sample records for site restoration scope

  1. Biotechnology for site restoration: scope of the problem

    Bitchaeva, O

    1996-09-18

    The potential of modern biotechnology for solving problems related with the nuclear industry, especially site restoration, are investigated. The advantages of biotechnology, the current applications in Russia, main points of international collaboration, and political considerations are discussed.

  2. Site Restoration

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A

    2001-04-01

    The objectives, the programme, and the achievements of the Site Restoration Department of SCK-CEN in 2000 are summarised. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and activities related to the management of decommissioning projects. The department provides consultancy and services to external organisations.

  3. Site Restoration

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A.

    2001-01-01

    The objectives, the programme, and the achievements of the Site Restoration Department of SCK-CEN in 2000 are summarised. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and activities related to the management of decommissioning projects. The department provides consultancy and services to external organisations

  4. Site Restoration

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A

    2002-04-01

    The objectives, the programme, and the achievements of SCK-CEN's Site Restoration Department for 2001 are described. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and the management of spent fuel and the flow of dismantled materials and the recycling of materials from decommissioning activities based on the smelting of metallic materials in specialised foundries. The department provides consultancy and services to external organisations and performs R and D on new techniques including processes for the treatment of various waste components including the reprocessing of spent fuel, the treatment of tritium, the treatment of liquid alkali metals into cabonates through oxidation, the treatment of radioactive organic waste and the reconditioning of bituminised waste products.

  5. Restoration of landfill sites

    Jones, A K; Chamley, M E

    1986-10-01

    Many excavated quarries are subsequently used for waste disposal operations and frequently imported landfill provides the only means of restoring a former quarry to some beneficial afteruse. Concentrating solely on the final surface cover, this paper sets out some of the principles, which should be considered by those involved in landfill operations to ensure the long term success of restoration schemes. With the emphasis on restoration to agriculture, factors such as availability of cover materials and depths necessary are discussed in terms of requirements to support plant growth, protect clay capping layers and prevent damage to agricultural implements. Soil handling and appropriate after care management are considered. 4 refs.

  6. Site Outcomes Baseline Multi Year Work Plan Volume 1, River Corridor Restoration Baseline

    Wintczak, T.M.

    2001-01-01

    The River Corridor Restoration volume is a compilation of Hanford Site scope, which excludes the approximately 194 km 2 Central Plateau. The River Corridor scope is currently contractually assigned to Fluor Hanford, Bechtel Hanford, inc., DynCorp, and Pacific Northwest National Laboratory, and others. The purpose of this project specification is to provide an overall scoping document for the River Corridor Restoration volume, and to provide a link with the overall Hanford Site River Corridor scope. Additionally, this specification provides an integrated and consolidated source of information for the various scopes, by current contract, for the River Corridor Restoration Baseline. It identifies the vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards

  7. Mechanical site preparation for forest restoration

    Magnus Lof; Daniel C. Dey; Rafael M. Navarro; Douglass F. Jacobs

    2012-01-01

    Forest restoration projects have become increasingly common around the world and planting trees is almost always a key component. Low seedling survival and growth may result in restoration failures and various mechanical site preparation techniques for treatment of soils and vegetation are important tools used to help counteract this. In this article, we synthesize the...

  8. Project Rio Blanco: site restoration. Final report

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  9. Restoration of opencast coal mining sites

    Brent-Jones, E.

    1983-10-01

    The paper describes the measures taken by the NCB Opencast Executive in the restoration of opencast sites on completion of mining. Soil surveys are carried out before mining and these, together with geological information, enable a comprehensive soil restoration strategy to be worked out. The soils replacement plan shows the location and thickness of soils to be replaced, and whether special treatment is required to improve the condition of the soil. The equipment that has been developed to cope with the heavy restoration work is described and the conditions under which it is used are given.

  10. Declassification and restoration of nuclear sites

    Noynaert, L.; Rahier, A.; Deboodt, P.; Massaut, V.

    1998-09-01

    The report describes the legal and technical aspects of the declassification and restoration of nuclear sites. This involves a number of technical and administrative operations. Different declassification strategies are discussed. The evaluation of the risks and impact on the environment are discussed as well as research and development needs, costs and possible sources for funding

  11. Restoration of sites affected by opencast mining

    Perez de Uribarri, D.

    This report is based on a report by Drs Habil, Stozodka and S Frohnert (Dipl Eng), lecturers in the Opencast Mining and Hydroeconomics Technical Department of the Freiburg Mining Academy in Saxony, East Germany. The report finishes with a brief description of Spanish laws relating to site restoration, currently the subject of considerable debate.

  12. 76 FR 9327 - Gulf Spill Restoration Planning; Notice of Intent To Begin Restoration Scoping and Prepare a...

    2011-02-17

    ... to compensate the public and the environment for loss of natural resources and services from the... Florida, as well as human uses of these resources. Natural Resource Damage Assessment (NRDA) is the... Restoration Planning; Notice of Intent To Begin Restoration Scoping and Prepare a Programmatic Environmental...

  13. Environmental Restoration Program quality system requirements for the Hanford Site

    Cote, R.F.

    1993-11-01

    This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment

  14. Forward-looking farmers owning multiple potential wetland restoration sites: implications for efficient restoration

    Schroder (Kushch), Svetlana; Lang, Zhengxin; Rabotyagov, Sergey

    2018-04-01

    Wetland restoration can increase the provision of multiple non-market ecosystem services. Environmental and socio-economic factors need to be accounted for when land is withdrawn from agriculture and wetlands are restored. We build multi-objective optimization models to provide decision support for wetland restoration in the Le Sueur river watershed in Southern Minnesota. We integrate environmental objectives of sediment reduction and habitat protection with socio-economic factors associated with the overlap of private land with potential wetland restoration sites in the watershed and the costs representing forward-looking farmers voluntarily taking land out of agricultural production in favor of wetland restoration. Our results demonstrate that the inclusion of these factors early on in the restoration planning process affects both the total costs of the restoration project and the spatial distribution of optimally selected wetland restoration sites.

  15. Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93

    1993-01-01

    This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites

  16. Transforming Ecosystems: When, Where, and How to Restore Contaminated Sites

    Rohr, Jason R; Farag, Aïda M; Cadotte, Marc W; Clements, William H; Smith, James R; Ulrich, Cheryl P; Woods, Richard

    2016-01-01

    Chemical contamination has impaired ecosystems, reducing biodiversity and the provisioning of functions and services. This has spurred a movement to restore contaminated ecosystems and develop and implement national and international regulations that require it. Nevertheless, ecological restoration remains a young and rapidly growing discipline and its intersection with toxicology is even more nascent and underdeveloped. Consequently, we provide guidance to scientists and practitioners on when, where, and how to restore contaminated ecosystems. Although restoration has many benefits, it also can be expensive, and in many cases systems can recover without human intervention. Hence, the first question we address is: “When should we restore contaminated ecosystems?” Second, we provide suggestions on what to restore—biodiversity, functions, services, all 3, or something else—and where to restore given expected changes to habitats driven by global climate change. Finally, we provide guidance on how to restore contaminated ecosystems. To do this, we analyze critical aspects of the literature dealing with the ecology of restoring contaminated ecosystems. Additionally, we review approaches for translating the science of restoration to on-the-ground actions, which includes discussions of market incentives and the finances of restoration, stakeholder outreach and governance models for ecosystem restoration, and working with contractors to implement restoration plans. By explicitly considering the mechanisms and strategies that maximize the success of the restoration of contaminated sites, we hope that our synthesis serves to increase and improve collaborations between restoration ecologists and ecotoxicologists and set a roadmap for the restoration of contaminated ecosystems. PMID:26033665

  17. A COMPARISON OF APPROACHES TO PRIORITIZING SITES FOR RIPARIAN RESTORATION

    This study compares the results of Olson and Harris (1997) and Russell et al.(1997)in their work to prioritize sites for riparian restoration in the San Luis Rey River watershed. Olson and Harris defined reaches of the mainstem and evaluated the relative potential for restoration...

  18. Prioritizing ecological restoration among sites in multi-stressor landscapes.

    Neeson, Thomas M; Smith, Sigrid D P; Allan, J David; McIntyre, Peter B

    2016-09-01

    Most ecosystems are impacted by multiple local and long-distance stressors, many of which interact in complex ways. We present a framework for prioritizing ecological restoration efforts among sites in multi-stressor landscapes. Using a simple model, we show that both the economic and sociopolitical costs of restoration will typically be lower at sites with a relatively small number of severe problems than at sites with numerous lesser problems. Based on these results, we propose using cumulative stress and evenness of stressor impact as complementary indices that together reflect key challenges of restoring a site to improved condition. To illustrate this approach, we analyze stressor evenness across the world's rivers and the Laurentian Great Lakes. This exploration reveals that evenness and cumulative stress are decoupled, enabling selection of sites where remediating a modest number of high-intensity stressors could substantially reduce cumulative stress. Just as species richness and species evenness are fundamental axes of biological diversity, we argue that cumulative stress and stressor evenness constitute fundamental axes for identifying restoration opportunities in multi-stressor landscapes. Our results highlight opportunities to boost restoration efficiency through strategic use of multi-stressor datasets to identify sites that maximize ecological response per stressor remediated. This prioritization framework can also be expanded to account for the feasibility of remediation and the expected societal benefits of restoration projects. © 2016 by the Ecological Society of America.

  19. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  20. Klipperaas study site. Scope of activities and main results

    Ahlbom, K.; Andersson, J.E.; Andersson, Peter; Ittner, T.; Tiren, S.; Ljunggren, C.

    1992-09-01

    During the period from 1977 - 1986 SKB (Swedish Nuclear Fuel and Waste Management Co.) performed surface and borehole investigations of 14 study sites for the purpose of assessing their suitability for a repository of spent nuclear fuel. The next phase in the SKB site selection rpogramme will be to perform detailed characterisation, including characterization from shafts and/or tunnels, of two or three sites. The detailed investigations will continue over several years to provide all the data needed for a licensing application to build a repository. Such an application is foreseen to be given to the authorities around the year 2003. It is presently not clear if any of the study sites will be selected as a site for detailed characterization. Other sites with geological and/or socio-economical characteristics judged more favorable may very well be the ones selected. However, as a part of the background documentation needed for the site selection studies to come, summary reports will be prepared for most study sites. These reports will include scope of activities, main results, uncertainties and need of complementary investigations. This report concern the Klipperaas study site. The main topics are the scope of activities, geologic model, geohydrological model, groundwater chemistry, assessment of solute transport, and rock mechanics

  1. Hanford Site waste management and environmental restoration integration plan

    Merrick, D.L.

    1990-01-01

    The ''Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs

  2. Finnsjoen study site. Scope of activities and main results

    Ahlbom, K.; Andersson, J.E.; Andersson, Peter; Ittner, T.; Tiren, S.; Ljunggren, C.

    1992-12-01

    The Finnsjoen study site was selected in 1977 to provide input to the KBS-1 and KBS-2 performance assessments. The site was later used as a test site for testing new instruments and new site characterization methods, as well as a research site for studying mainly groundwater flow and groundwater transport. All together, the Finnsjoen studies have involved 11 cored boreholes, down to max 700 m depth, and extensive borehole geophysical, geochemical and geohydraulic measurements, as well as rock stress measurements and tracer tests. This report presents the scope of the Finnsjoen studies together with main results. Conceptual uncertainties in assumptions and models are discussed with emphasis on the models used for the performance assessment SKB91. Of special interest for the Finnsjoen study site is the strong influence caused by a subhorizontal fracture zone on groundwater flow, transport and chemistry

  3. Sternoe study site. Scope of activities and main results

    Ahlbom, K.; Andersson, J.E.; Nordqvist, R.; Tiren, S.; Ljunggren, C.; Voss, C.

    1992-01-01

    During the period from 1977-1986 SKB (Swedish Nuclear Fuel and Waste Management Co) performed surface and borehole investigations of 14 study sites for the purpose of assessing their suitability for a repository of spent nuclear fuel. The next phase in the SKB site selection programme will be to perform detailed characterization, including characterization from shafts and/or tunnels, of two or three sites. The detailed investigations will continue over several years to provide all the data needed for a licensing application to build a repository. Such an application is foreseen to be given to the authorities around the year 2003. It is presently not clear if anyone of the previously investigated study sites will be selected as a site for detailed characterization. Other sites with geological and/or socio-economical characteristics judged more favourable may very well be the ones selected. However, as a part of the background documentation needed for the site selection studies to come, summary reports will be prepared for most study sites. These reports will include scope of activities, main results, uncertainties and need of complementary investigations. This report concerns the Sternoe study site. This site was one of the first sites to be investigated by SKB . The studies at Sternoe were made under severe time-constraints and with prototype borehole instrumentations. These limitations should be kept in mind when reading the report. (41 refs., 16 figs., 12 tabs.) (au)

  4. Geothermal Well Site Restoration and Plug and Abandonment of Wells

    Rinehart, Ben N.

    1994-08-01

    A report is presented on the final phase of an energy research program conducted by the U.S. Department of Energy (DOE) involving two geothermal well sites in the State of Louisiana-the Gladys McCall site and the Willis Hulin site. The research program was intended to improve geothermal technology and to determine the efficacy of producing electricity commercially from geopressured resource sites. The final phase of the program consisted of plug and abandonment (P&A) of the wells and restoration of the well sites. Restoration involved (a) initial soil and water sampling and analysis; (b) removal and disposal of well pads, concrete, utility poles, and trash; (c) plugging of monitor and freshwater wells; and (d) site leveling and general cleanup. Restoration of the McCall site required removal of naturally occurring radioactive material (NORM), which was costly and time-consuming. Exhibits are included that provide copies of work permits and authorizations, P&A reports and procedures, daily workover and current conditions report, and cost and salvage reports. Site locations, grid maps, and photographs are provided.

  5. Strategic plan for Hanford Site Environmental Restoration Information Management

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site's soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site's production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user's needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach

  6. Project Gasbuggy well plugging and site restoration plan

    1978-07-01

    The operational plan for conducting the final restoration work at the site of the first U.S. underground nuclear experiment for the stimulation of low-productivity natural gas reservoirs is given. The plan includes well plugging procedures, surface facilities decontamination and removal procedures, radiological guidelines, and environmental considerations

  7. Gideaa study site. Scope of activities and main results

    Ahlbom, K.; Andersson, J.E.; Nordqvist, R.; Ljunggren, C.; Tiren, S.; Voss, C.

    1991-10-01

    During the period from 1977-1986 SKB (Swedish Nuclear Fuel and Waste Management Co) performed surface and borehole investigations of 14 study sites for the purpose of assessing their suitability for a repository of spent nuclear fuel. The next phase in the SKB site selection programme will be to perform detailed characterization, including characterization from shafts and/or tunnels, of two or three sites. The detailed investigations will continue over several years to provide all the data needed for a licensing application to build a repository. Such an application is foreseen to be given to the authorities around the year 2003. It is presently not clear if anyone of the study sites will be selected as a site for detailed characterization. Other site with geological and/or socio-economical characteristics judged more favourable may very well be the ones selected. However, as a part of the background documentation needed for the site selection studies to come, summary reports will be prepared for most study sites. These reports will include scope of activities, main results, uncertainties and need of complementary investigations. This report concerns the Gideaa study site. (au)

  8. Kamlunge study site. Scope of activities and main results

    Ahlbom, K.; Andersson, J.E.; Andersson, P.; Ittner, T.; Tiren, S.; Ljunggren, C.

    1992-05-01

    During the period from 1977-1986 SKB (Swedish nuclear Fuel and Waste Management Co.) performed surface and borehole investigations of 14 study sites for the purpose of assessing their suitability for a repository of spent nuclear fuel. The next phase in the SKB site selection programme will be to perform detailed characterization, including characterization from shafts and/or tunnels, of two or three sites. The detailed investigations will continue over several years to provide all the data needed for a licensing application to build a repository. Such an application is foreseen to be given to the authorities around the year 2003. It is presently not clear if anyone of the study sites will be selected as a site for detailed characterization. Other sites with geological and/or socio-economical characteristics judged more favourable may very well be selected. However, as a part of the background documentation needed for the site selection studies to come, summary reports will be prepared for most study sites. These reports will include scope of activities, main results, uncertainties and need of complementary investigations. This report concerns the Kamlunge study site. (79 refs.) (au)

  9. Fjaellveden study site. Scope of activities and main results

    Ahlbom, K.; Andersson, J.E.; Nordqvist, R.; Ljunggren, C.; Tiren, S.; Voss, C.

    1991-10-01

    During the period from 1977-1986 SKB (Swedish Nuclear Fuel and Waste Management CO) performed surface and borehole investigations of 14 study sites for the purpose of assessing their suitability for a repository of spent nuclear fuel. The next phase in the SKB site selection programme will be to perform detailed characterization, including characterization from shafts and/or tunnels, of two or three sites. The detailed investigations will continue over several years to provide all the data needed for a licensing application to build repository. Such an application is foreseen to be given to the authorities around the year 2003. It is presently not clear if anyone of the study sites will be selected as a site for detailed characterization. Other sites with geological and/or socio-economical characteristics judged more favourable may very well be the ones selected. However, as a part of the background documentation needed for the site selection studies to come, summary reports will be prepared for most study sites. These reports will include scope of activities, main results, uncertainties and need for complementary investigations. This report concerns the Fjaellveden study site. (au)

  10. Savannah River Site environmental restoration lessons learned program

    Plunkett, R.A.; Leibfarth, E.C.; Treger, T.M.; Blackmon, A.M.

    1993-01-01

    For the past three years environmental restoration has been formally consolidated at Savannah River Site. Accomplishments include waste site investigations to closure activities. Positive, as well as negatively impacting, events have occurred. Until recently, lessons learned were captured on a less than formal basis. Now, a program based upon critiques, evaluations and corrective actions is being used. This presentation reviews the development, implementation and use of that program

  11. Resource Conservation and Recovery Act industrial site environmental restoration site characterization plan. Area 6 Decontamination Pond Facility. Revision 1

    1996-08-01

    This plan presents the strategy for the characterization of the Area 6 Decontamination Pond Facility at the Nevada Test Site which will be conducted for the US Department of Energy, Nevada Operations Office, Environmental Restoration Division. The objectives of the planned activities are to: obtain sufficient, sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site; obtain sufficient, sample analytical data for management of investigation-derived waste. The scope of the characterization may include surface radiation survey(s), surface soil sampling, subsurface soil boring (i.e., drilling), and sampling of soil in and around the pond; in situ sampling of the soil within subsurface soil borings; and sample analysis for both site characterization and waste management purposes

  12. Aquifer restoration at uranium in situ leach sites

    Anastasi, F.S.; Williams, R.E.

    1985-01-01

    In situ mining of uranium involves injection of a leaching solution (lixiviant) into an ore-bearing aquifer. Frequently, the ground water in the mined aquifer is a domestic or livestock water supply. As the lixiviant migrates through the ore body, uranium and various associated elements such as arsenic, selenium, molybdenum, vanadium and radium-226 are mobilized in the ground water. Aquifer restoration after in situ mining is not fully understood. Several methods have been developed to restore mined aquifers to pre-mining (baseline) quality. Commonly used methods include ground water sweeping, clean water injection, and treatment by ion exchange and reverse osmosis technologies. Ammonium carbonate lixiviant was used at one RandD in situ mine. Attempts were made to restore the aquifer using a variety of methods. Efforts were successful in reducing concentrations of the majority of contaminants to baseline levels. Concentrations of certain parameters, however, remained at levels above baseline six months after restoration ceased. Relatively large quantities of ground water were processed in the restoration attempt considering the small size of the project (1.25 acre). More thorough characterization of the hydrogeology of the site may have enhanced the effectiveness of restoration and reduced potential environmental impacts associated with the project. This paper presents some of the findings of a research project conducted by the Mineral Resources Waste Management Team at the University of Idaho in Moscow, Idaho. Views contained herein do not reflect U.S. Nuclear Regulatory Commission policy

  13. Restoring public trust while tearing down site in rural Ohio

    Schneider, Jerry; Wagner, Jeffrey; Connell, Judy

    2007-01-01

    In the mid-1980's, the impact of three decades of uranium processing near rural Fernald, Ohio, 18 miles northwest of Cincinnati, became the centre of national public controversy. When a series of incidents at the uranium foundry brought to light the years of contamination to the environment and surrounding farmland communities, local citizens' groups united and demanded a role in determining the plans for cleaning up the site. One citizens' group, Fernald Residents for Environmental Safety and Health (FRESH), formed in 1984 following reports that nearly 300 pounds of enriched uranium oxide had been released from a dust-collector system, and three off-property wells south of the site were contaminated with uranium. For 22 years, FRESH monitored activities at Fernald and participated in the decision-making process with management and regulators. The job of FRESH ended on 19 January this year when the Fernald Site was declared clean of all nuclear contamination and open to public access. It marked the end of a remarkable turnaround in public confidence and trust that had attracted critical reports from around the world. When personnel from Fluor arrived in 1992, the management team thought it understood the issues and concerns of each stakeholder group, and was determined to implement the decommissioning scope of work aggressively, confident that stakeholders would agree with its plans. This approach resulted in strained relationships with opinion leaders during the early months of Fluor's contract. To forge better relationships, the U.S. Department of Energy (DOE) who owns the site, and Fluor embarked on three new strategies based on engaging citizens and interested stakeholder groups in the decision-making process. The first strategy was opening communication channels with site leadership, technical staff, and regulators. This strategy combined a strong public-information program with two-way communications between management and the community, soliciting and

  14. Temporary restorative treatment in children and adolescents with amelogenesis imperfecta: Scoping review.

    Cristhian Cisneros

    2017-12-01

    Full Text Available Background: Amelogenesis imperfecta (AI is a group of disorders that affect the enamel of the teeth, either in quality or quantity. This alteration causes sensitivity and is associated with factors that could affect the strength of the adhesive bond of the restorative material. Aim: To review the literature regarding the most used temporary restorative treatment in children and adolescents with AI. Methods: This scoping review aimed to include case reports, literature reviews and original studies that evaluated restorative materials for the teeth of children and adolescents with AI. Editorials, meeting abstracts and letters to the editor were excluded. The following electronic databases were used: Medline (Ovid, PubMed, Ebsco, Scopus (Elsevier and Web of Science (Thomson Reuters. Manual searches in the reference lists of the included articles were also carried out. Finally, a search in Google Scholar restricted to the first 100 hits was performed. Duplicates were eliminated upon identification. The search covered a period between the years of 2011 and 2016. PRISMA guidelines were used for reporting the review. The evidence ranking was carried out by means of the Oxford criteria. Results: Six articles met the eligibility criteria and were included in this scoping review. Three articles were case reports, one was a review and two were original studies. For the treatment of AI, direct or indirect composite resins were the most commonly used material of choice in the retrieved studies because they demonstrate greater longevity, aesthetics and function compared to the other materials used. Conclusions: Among children and adolescents with AI, the temporary restorative treatment that demonstrated better long-term results in permanent teeth was the direct and indirect composite resins. However, high quality studies should be conducted to confirm the results presented herein.

  15. 76 FR 51022 - Juneau Hydropower, Inc.; Notice of Scoping Meeting and Site Visit and Soliciting Scoping Comments...

    2011-08-17

    ... Hydropower, Inc.; Notice of Scoping Meeting and Site Visit and Soliciting Scoping Comments for an Applicant...: Alternative Licensing Process. b. Project No.: 13563-001. c. Applicant: Juneau Hydropower, Inc. d. Name of... Mitchell, Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, e...

  16. Resource Conservation and Recovery Act industrial site environmental restoration site characterization plan. Area 6 Steam Cleaning Effluent Ponds

    1996-02-01

    This plan presents the strategy for the characterization of the Area 6 South and North Steam Cleaning Effluent Ponds (SCEPs) at the Nevada Test Site (NTS) to be conducted for the US Department of Energy, Nevada Operations Office (DOE/NV), Environmental Restoration Division (ERD). The purposes of the planned activities are to: obtain sufficient, sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site; obtain sufficient, sample analytical data for management of investigation-derived waste (IDW). The scope of the characterization may include excavation, drilling, and sampling of soil in and around both ponds; sampling of the excavated material; in situ sampling of the soil at the bottom and on the sides of the excavations as well as within subsurface borings; and conducting sample analysis for both characterization and waste management purposes. Contaminants of concern include RCRA-regulated VOCs and metals

  17. The responsibility of business enterprises to restore access to essential public service at resettlement sites

    van der Ploeg, Lidewij; Vanclay, Francis; Lourenço, Ivo; Hesselman, Marlies; Hallo de Wolf, Antenor; Toebes, Brigit

    2017-01-01

    This chapter examines the provision of essential public services in resettlement sites associated with project induced displacement. Restoring and improving access to essential public services in resettlement sites is an important aspect of livelihood restoration of affected peoples. Project

  18. Site, Sector, Scope: Mapping the Epistemological Landscape of Health Humanities.

    Charise, Andrea

    2017-12-01

    This essay presents a critical appraisal of the current state of baccalaureate Health Humanities, with a special focus on the contextual differences currently influencing the implementation of this field in Canada and, to a lesser extent, the United States and United Kingdom. I argue that the epistemological bedrock of Health Humanities goes beyond that generated by its written texts to include three external factors that are especially pertinent to undergraduate education: site (the setting of Health Humanities education), sector (the disciplinary eligibility for funding) and scope (the critical engagement with a program's local context alongside an emergent "core" of Health Humanities knowledge, learning, and practice). Drawing largely from the Canadian context, I discuss how these differences can inform or obstruct this field's development, and offer preliminary recommendations for encouraging the growth of baccalaureate Health Humanities-in Canada and elsewhere-in light of these factors.

  19. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  20. Remediation and restoration of a thorium and radium contaminated site

    Drury, N.C.

    1995-01-01

    This paper describes the remediation and restoration of approximately 130,000 square metres of derelict land in East London, contaminated with radioactive and chemical substances. The land had been the location of a chemical plant operated under different owners for about ninety years. The plant was demolished in the 1970's and lay derelict for approximately 10 years. This site was bought by developers in the late 1980's with the intention of constructing a residential complex, and therefore had to be cleared of contamination such that it could be released for unrestricted use. This paper provides an overview of the initial radiological status of the site, the methodology and safety measures adopted for the decontamination operations with emphasis placed on the various radiological monitoring and sampling regimes and techniques employed for: a) providing on-going evaluation of the decontamination progress, b) the radiological characterisation of the waste arisings in order to identify various available disposal routes, c) ensuring safety for both operators and members of the public during decontamination operations, d) ensuring compliance with the radiological end-point agreed with the authorising department (HMIP) as the final stage of the restoration. (author) 5 figs

  1. Remediation and restoration of a thorium and radium contaminated site

    Drury, N.C. [WS Atkins Consultants, Epsom Surrey (United Kingdom)

    1995-12-31

    This paper describes the remediation and restoration of approximately 130,000 square metres of derelict land in East London, contaminated with radioactive and chemical substances. The land had been the location of a chemical plant operated under different owners for about ninety years. The plant was demolished in the 1970`s and lay derelict for approximately 10 years. This site was bought by developers in the late 1980`s with the intention of constructing a residential complex, and therefore had to be cleared of contamination such that it could be released for unrestricted use. This paper provides an overview of the initial radiological status of the site, the methodology and safety measures adopted for the decontamination operations with emphasis placed on the various radiological monitoring and sampling regimes and techniques employed for: (a) providing on-going evaluation of the decontamination progress, (b) the radiological characterisation of the waste arisings in order to identify various available disposal routes, (c) ensuring safety for both operators and members of the public during decontamination operations, (d) ensuring compliance with the radiological end-point agreed with the authorising department (HMIP) as the final stage of the restoration. (author) 5 figs.

  2. Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT

    Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.; Thom, Ronald M.; Kaufmann, Ronald M.; Zimmerman, Shon A.; Sagar, Jina; Buenau, Kate E.; Corbett, C.

    2012-05-31

    The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

  3. Declassification and restoration of nuclear sites; Declassement et restauration des sites nucleaires

    Noynaert, L; Rahier, A; Deboodt, P; Massaut, V

    1998-09-01

    The report describes the legal and technical aspects of the declassification and restoration of nuclear sites. This involves a number of technical and administrative operations. Different declassification strategies are discussed. The evaluation of the risks and impact on the environment are discussed as well as research and development needs, costs and possible sources for funding.

  4. Ecological restoration of Central European mining sites: a summary of a multi-site analysis

    Prach, K.; Rehounkova, K.; Rehounek, J.; Konvalinkova, P. [University of South Bohemia, Ceske Budejovice (Czech Republic)

    2011-07-01

    Sites disturbed by mining were surveyed in the Czech Republic, central Europe. The sites included spoil heaps from coal mining, sand and gravel pits, extracted peatlands and stone quarries. The following main conclusions emerged: I) potential for spontaneous succession to be used in restoration projects is between 95 and 100% of the total area disturbed; ii) mining sites, if mining is properly designed and then the sites are left to spontaneous succession, often act as refugia for endangered and retreating organisms, and may contribute substantially to local biodiversity.

  5. LANL environmental restoration site ranking system: System description. Final report

    Merkhofer, L.; Kann, A.; Voth, M. [Applied Decision Analysis, Inc., Menlo Park, CA (United States)

    1992-10-13

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides.

  6. LANL environmental restoration site ranking system: System description. Final report

    Merkhofer, L.; Kann, A.; Voth, M.

    1992-01-01

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides

  7. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

  8. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility: Volume 1. Revision 1

    Weekes, D.C.; Ford, B.H.; Jaeger, G.K.

    1996-09-01

    This site characterization report provides the results of the field data collection activities for the Environmental Restoration Disposal Facility site. Information gathered on the geology, hydrology, ecology, chemistry, and cultural resources of the area is presented. The Environmental Restoration Disposal Facility is located at the Hanford Site in Richland, Washington

  9. 76 FR 7835 - Great River Hydropower, LLC; Notice of Scoping Meetings and Environmental Site Review and...

    2011-02-11

    ... Hydropower, LLC; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments.... c. Date filed: July 12, 2010. d. Applicant: Great River Hydropower, LLC. e. Name of Project: Upper... 796-foot-long by 46-foot-wide by 25-foot-high concrete hydropower structure consisting of 30 turbine...

  10. Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

    1995-11-01

    This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program

  11. Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

    1995-11-01

    This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program.

  12. Local Community Perceptions of Mine Site Restoration Using Phytoremediation in Abitibi-Temiscamingue (Quebec).

    Vodouhe, Fifanou G; Khasa, Damase P

    2015-01-01

    This work explores factors supporting people perception about mine site restoration and phytoremediation. Phytoremediation is one of the most eco-friendly restoration strategy emerged since the last two decades but studies on local people perception on this restoration strategy are scarce. To fill in this gap, data were collected from mining stakeholders using a structured questionnaire administered through snowball sampling method. We used Multiple Correspondence Analysis as implemented in the software XLSTAT to visualize relationship between participants' characteristics, their view on mine site restoration and phytoremediation. Results clearly show out that people perception on mine site restoration is influenced by mining activities effects on health and region attractiveness. Phytoremediation (65.21%) was rated positively with regard to its environment potential, aesthetic and consideration for future generation followed by fillings and excavating. Restoration strategy costs have no effect on people choice and participants prefer use of shrubs as vegetation component of phytoremediation to reach their restoration objective.

  13. Tank farm restoration and safe operation, project W-314, upgrade scope summary report (USSR)

    Jacobson, R.W.

    1997-01-01

    This revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from Alternative Generation Analysis (AGA), customer guidance, and changing requirements. It defines the actual upgrades currently in scope, and provides traceability to the requirements and/or drivers

  14. Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)

    Gilbert, J.L.

    1998-01-01

    The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454

  15. Site descriptions of environmental restoration units at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Kuhaida, A.J. Jr.; Parker, A.F.

    1997-02-01

    This report provides summary information on Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) sites as listed in the Oak Ridge Reservation Federal Facility Agreement (FFA), dated January 1, 1992, Appendix C. The Oak Ridge National Laboratory was built in 1943 as part of the World War II Manhattan Project. The original mission of ORNL was to produce and chemically separate the first gram-quantities of plutonium as part of the national effort to produce the atomic bomb. The current mission of ORNL is to provide applied research and development in support of the U.S. Department of Energy (DOE) programs in nuclear fusion and fission, energy conservation, fossil fuels, and other energy technologies and to perform basic scientific research in selected areas of the physical, life, and environmental sciences. ER is also tasked with clean up or mitigation of environmental impacts resulting from past waste management practices on portions of the approximately 37,000 acres within the Oak Ridge Reservation (ORR). Other installations located within the ORR are the Gaseous Diffusion Plant (K-25) and the Y-12 plant. The remedial action strategy currently integrates state and federal regulations for efficient compliance and approaches for both investigations and remediation efforts on a Waste Area Grouping (WAG) basis. As defined in the ORR FFA Quarterly Report July - September 1995, a WAG is a grouping of potentially contaminated sites based on drainage area and similar waste characteristics. These contaminated sites are further divided into four categories based on existing information concerning whether the data are generated for scoping or remedial investigation (RI) purposes. These areas are as follows: (1) Operable Units (OU); (2) Characterization Areas (CA); (3) Remedial Site Evaluation (RSE) Areas; and (4) Removal Site Evaluation (RmSE) Areas.

  16. Wetland restoration and compliance issues on the Savannah River site

    Wein, G.R.; McLeod, K.W.; Sharitz, R.R.

    1993-01-01

    Operation of the nuclear production reactors on the Savannah River Site has faced potential conflicts with wetland regulations on several occasions. This paper provides two examples in which regulatory compliance and restoration research have been meshed, providing both compliance and better knowledge to aid future regulatory needs. The decision to restart the L reactor required the mitigation of thermal effluents under Sec. 316 of the Clean Water Act. The National Pollutant Discharge Elimination System, permit for the selected mitigation alternative, a 405-ha once-through cooling reservoir, required the establishment of a balanced biological community (BBC) within the lake. To promote the development of a BBC, the reservoir was seeded with water from an existing BBC (Par Pond) and stocked with fish and had artificial reefs constructed. The US Department of Energy (DOE) also requested that the Savannah River Ecology Laboratory establish littoral/wetland vegetation along the shoreline to provide aquatic and wildlife habitat, shoreline stabilization, and a good faith effort toward the establishment of a BBC. The development of wetland vegetation was deemed important to the successful development of a BBC within L Lake. However, in a similar cooling reservoir system constructed in 1957 (Par Pond), wetland vegetation successfully developed without any planting effort. Other than the good faith effort toward a BBC, there is no reason to assume a littoral/wetland community would not develop of its own accord. However, research conducted at L Lake indicates that the planting of wetland vegetation at L Lake accelerated the process of natural selection over that of areas that were not planted

  17. 76 FR 11426 - Gulf Spill Restoration Planning; Public Scoping Meetings for the Programmatic Environmental...

    2011-03-02

    ... Center, 3401 Cultural Center Drive, Port Arthur, TX. 10. Thursday, March 31, 2011: Texas A & M at... restoration types should be sent to: NOAA Restoration Center, Attn: DWH PEIS Comments, 263 13th Avenue South... County Government Center, County Commissioner Chambers, 840 W. 11th Street, Panama City, FL. 3. Monday...

  18. Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93

    1993-01-01

    The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones

  19. On-site vs off-site management of environmental restoration waste: A cost effectiveness analysis

    Morse, M.A.; Aamodt, P.L.; Cox, W.B.

    1996-01-01

    The Sandia National Laboratories Environmental Restoration Project is expected to generate relatively large volumes of hazardous waste as a result of cleanup operations. These volumes will exceed the Laboratories existing waste management capacity. This paper presents four options for managing remediation wastes, including three alternatives for on-site waste management utilizing a corrective action management unit (CAMU). Costs are estimated for each of the four options based on current volumetric estimates of hazardous waste. Cost equations are derived for each of the options with the variables being waste volumes, the major unknowns in the analysis. These equations provide a means to update cost estimates as volume estimates change. This approach may be helpful to others facing similar waste management decisions

  20. How can we restore biodiversity and ecosystem services in mining and industrial sites?

    Prach, Karel; Tolvanen, A.

    2016-01-01

    Roč. 23, č. 14 (2016), s. 13587-13590 ISSN 0944-1344 Institutional support: RVO:67985939 Keywords : restoration * mining sites * reclamation Subject RIV: EH - Ecology, Behaviour Impact factor: 2.741, year: 2016

  1. Restoration of uranium in-situ leaching sites

    Hill, A.D.; Silberberg, I.H.; Walsh, M.P.; Breland, W.M.; Humenick, M.J.; Schechter, R.S.

    1980-01-01

    Ammonium ions introduced into the formation during in-situ uranium leach mining must be removed by a restoration process. Ion exchange processes to strip sorbed ammonium cation from the clays have been modeled and studied experimentally. It is concluded that ammonium removal can be accomplished best by a high-ionic-strength flush. The migration of uncovered ammonium cation in groundwater also is studied. 19 refs

  2. Opencast coal mining and site restoration in Britain today

    Whitworth, K.

    1981-05-07

    Production of opencast coal in Great Britain totalled around 13 million tons in 1980. Compared with underground coal, average profits are high and production costs low. Opencast mines thus make an important contribution to high-grade coal supply in Great Britain and to the financial situation of the National Coal Board. Former open-cast mines in Great Britain have been restored into leisure and pleasure regions that have become part of the rural scene.

  3. Ankara Historic City Centre Restoration Site Conservation Plan, its Characteristics, and Rationales for its Revocation

    Mehmet Tuncer

    2013-12-01

    Full Text Available This is a comprehensive evaluation of the 1: 5000 Ankara Historic City Centre Restoration Site Conservation Master Development Plan and the 1: 1000 Conservation Implementation Plans, which have become a matter of litigation against the Ankara Metropolitan Municipality, filed by various non-governmental organizations, universities, the Union of Chambers of Turkish Architects and Engineers (TMMOB and public institutions; in terms of the environment, transportation and traffic as regards the entirety of the planned location, and the integrity of the plan, based on conservation-reclamation planning essentials and public interest. Thus the Ulus Ankara Historic City Centre Restoration Site Conservation Master Development and Implementation Plan and Plan Notes as ratified by the Ankara Metropolitan Municipality and Conservation Board, are examined in this context in terms of restoration site, protected site, conservation site, interaction and transition sites and historic and cultural properties.

  4. Restoration and Rehabilitation of world heritage Site of Chupan Church

    S. Darvish Rohani

    2015-08-01

    Full Text Available Church of Chupan is located in Jolfa cityin north of Iran and is laid at south side of Arax River. Built of the church traced back to 14th to 15th century and the time when Armenians were inhabited in the region. Chupan church had been inscribed at World Heritage List of UNESCO under no 1262 in 2008, as one of the five churches of “Armenian Monasteries of Azerbaijan province of Iran” dossier. As it is located at a religious and tourism road of Darresham and each year most of Armenian from all over the world visited the church as a part of a religious ceremony, also as the same church on opposite side of the Arax in Republic of Nakhchivan is completely destroyed between 1998-2002 and the church is the only existing evidence of these two couple church, the restoration and rehabilitation of chupan church is very important. Because of very bad statues of structure stability and long-term neglect of the conservation and preservation of the building, restoration and rehabilitation of the church in the earliest was necessary. Restoration of this church was my MA degree thesis and now as a Ph.D student in field of urban design and planning student, I am working on the next step which is to revitalization and rehabilitation of the church.

  5. Restoration and Rehabilitation of world heritage Site of Chupan Church

    Darvish Rohani, S.

    2015-08-01

    Church of Chupan is located in Jolfa cityin north of Iran and is laid at south side of Arax River. Built of the church traced back to 14th to 15th century and the time when Armenians were inhabited in the region. Chupan church had been inscribed at World Heritage List of UNESCO under no 1262 in 2008, as one of the five churches of "Armenian Monasteries of Azerbaijan province of Iran" dossier. As it is located at a religious and tourism road of Darresham and each year most of Armenian from all over the world visited the church as a part of a religious ceremony, also as the same church on opposite side of the Arax in Republic of Nakhchivan is completely destroyed between 1998-2002 and the church is the only existing evidence of these two couple church, the restoration and rehabilitation of chupan church is very important. Because of very bad statues of structure stability and long-term neglect of the conservation and preservation of the building, restoration and rehabilitation of the church in the earliest was necessary. Restoration of this church was my MA degree thesis and now as a Ph.D student in field of urban design and planning student, I am working on the next step which is to revitalization and rehabilitation of the church.

  6. 75 FR 42742 - Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13272-001] Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting July 15, 2010. a. Project No.: 13272-001. b. Name of Project: Old Harbor Hydroelectric Project. c. Location: On Mountain Creek, near the town of Old Harbor, Kodiak Island...

  7. Environmental Restoration and Waste Management Site-Specific Plan (SSP) for fiscal year 1992 (FY92)

    1991-09-01

    The FY-92 Site-Specific Plan (FY-92 SSP) for environmental restoration and waste management at the Idaho National Engineering Laboratory (INEL) is designed to provide the reader with easy access to the status of environmental restoration and waste management activities at INEL. The first chapter provides background on INIEL's physical environment, site history and mission, and general information about the site and its facilities. In addition, this chapter discusses the inter-relationships between the Site Specific Plan, the Environmental Restoration and Waste Management Five-Year Plan, the environmental restoration and waste management prioritization systems, and the Activity Data Sheets (ADSs) for environmental restoration and waste management. This discussion should help readers understand what the SSP is and how it fits into the environmental restoration and waste management process at INEL. This understanding should provide the reader with a better context for understanding the discussions in the SSP as well as a better feel for how and what to comment on during the public comment period that will be held from the first of September through the end of October 1991

  8. Tonopah Test Range Environmental Restoration Corrective Action Sites

    Ronald B. Jackson

    2007-01-01

    Corrective Action Sites (CASs) and Corrective Action Units (CAUs) at the Tonopah Test Range (TTR) may be placed into three categories: Clean Closure/No Further Action, Closure in Place, or Closure in Progress

  9. Vegetation dynamics at a Mojave Desert restoration site, 1992 to 2007

    Jeffrey E. Ott; E. Durant McArthur; Stewart C. Sanderson

    2011-01-01

    The Twist Hollow restoration site on BLM land near St. George, Utah, had been badly disturbed by sand mining, rock quarrying, dumping, off-road vehicles and target shooting prior to its closure and treatment. In December 1992 the site was sculpted and drill seeded with Indian ricegrass (Stipa hymenoides), sand dropseed (Sporobolus cryptandrus), galleta (Hilaria jamesii...

  10. 75 FR 71122 - Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review

    2010-11-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7518-012--New York] Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review November 15, 2010. Commission staff will be conducting two public scoping meetings and an environmental site review in support...

  11. Methodology for contaminated sites of military activity territories restoration

    Khrushchov, D. P.; Yushchenko, Yu. V.; Shekhunova, S. B.

    2002-01-01

    Major part of Eastern Europe countries meet environmental problems related to sites of military activity. Major part of these sites is characterised with degradation of natural landscapes and contamination of geological environment with toxic and hazardous waste representing actual and potential danger for population and environment. Actual danger is caused with localisation of toxic waste, hazardous materials and waste which are preventing normal land use. Potential danger is related to successive dispersion of contamination in biosphere as well as origin of new derivatives and products having toxic and hazardous properties. The list of such sites and objects comprises bases of land, air and naval forces. These objects include a network of infrastructures: storages of fuels and lubricants (surface, underground), filling stations, pipe lines, reparation stations, garages, decontamination stations, underground storages of different purposes, depots (for ammunition, chemical products), hospitals, constructions, firing grounds (tank, artillery, aircraft bombing etc.) and waste disposal sites. Special programs aimed at military industries and bases contaminated sites remediation have been carrying out in developed countries (USA, United Kingdom, Germany etc.). This experience was used in the frames of joint programs having been founded in several countries of Central and Eastern Europe (Chesh Republic, Slovakia, Lithuania etc.). (author)

  12. 2008 annual site restoration report of the BC Oil and Gas Commission

    NONE

    2009-07-15

    Oil and gas operators in British Columbia are responsible for all issues related to the surface reclamation of a site, including the management of contaminated sites. They require a certificate of restoration (CoR) for lands no longer required in the extraction of hydrocarbons. The CoR program ensures that the land used for oil and development is restored to a safe and productive state. The restoration process promotes the timely recovery of wellsite and facility locations and helps in managing environmental impacts. The BC Oil and Gas Commission oversees the restoration process by oil and gas operators through the application of regulations, compliance and enforcement. The Commission balances a broad range of environmental, economic and social considerations. Among its specific objectives are public safety, conservation of petroleum resources, promoting a healthy environment, and equitable participation in production. This report included a review of performance measures that have been developed to evaluate restoration programs, including well plugging. Site reclamation requirements for lands within the Agricultural Land Reserve (ALR) were also described along with orphan site reclamation activities. A CoR is issued after a permit holder demonstrates that the remediation criteria have been met. There are currently 3,814 sites that have received a CoR in the province. refs., tabs., figs.

  13. Environmental restoration at the Lawrence Livermore National Laboratory Livermore Site

    Ziagos, J.P.; Bainer, R.W.; Dresen, M.D.; Hoffman, J.D.

    1992-04-01

    Ground water beneath Lawrence Livermore National Laboratory (LLNL) near Livermore California, contains 19 compounds in concentrations exceeding regulatory standards. These include volatile organic compounds (VOCs), dissolved fuel hydrocarbons, free product gasoline, cadmium, chromium, lead, and tritium. VOCs are the most widespread hazardous materials in the ground water, covering an area of about 1.4 square miles. The other compounds occur sporadically around the site. The LLNL site was added to the National Priorities (Superfund) List in 1987. This paper describes the technology developed at LLNL to remediate soil and ground water contamination. Included in this paper are methods in which site characterization has been aided by using a drilling technique developed at LLNL to evaluate the vertical distribution of VOCs in multiple water-bearing zones in single borehole. The paper also describes the development and implementation of a comprehensive three-step program to investigate and evaluate potential sources of hazardous materials in soil and ground water

  14. Restoration of the Nabarlek uranium mine and mill site, Australia

    Waggitt, P.

    2000-01-01

    The Nabarlek Uranium Mine site is located in northern Australia, about 300 km east of Darwin. The mine operated from 1979 until 1989, at which time the plant was mothballed pending the discovery of a new ore body. In 1994 the Supervising Authorities determined that the facility should be decommissioned and the site rehabilitated, with all site work to be completed by 31 December 1995. The site was dismantled and rehabilitated. These were tasks that presented particular challenges due to the remoteness of the site, the extremes of the climate and the need to meet the requirements of regulators and the traditional landowners. The rehabilitation was assisted by the fact that tailings had been placed directly from the mill into the pit. Contaminated sediments from evaporation ponds, small amounts of process residues, contaminated scrap and other wastes were also contained in the pit at a suitable depth. The final landform was established taking into account the pre-mining landform, the preferred final land use and the need to allow for the erosive forces present in the environment. Radiological conditions were required to meet standards set by the Supervising Authorities in consultation with other stakeholders, including representatives of the traditional landowners. The paper explains how the challenges were overcome at all stages of the process and describes the outcomes to date of post-closure research and monitoring. Particular emphasis is given to radiological issues. The status of the site is currently being assessed for final close-out certification in respect of ecological as well as radiological issues. To date the programme is considered to have been successful. (author)

  15. A comparison of dose versus risk at environmental restoration sites

    Holm-Hansen, T.; Pastor, R.S.

    1996-01-01

    This paper compares current US Environmental Protection Agency methods for completing risk assessments at radionuclide-contaminated sites with the International Council for Radiation Protection dose-based method. The two methods produce inconsistent results that could complicate cleanup decisions. Important issues include uncertainties associated with the use of carcinogenic slope factors and methods to account for institutional controls and decay of the source term for decision-making purposes. Overall, risk management at sites contaminated with radionuclides should be driven by a dose-based approach through adoption of the proposed 15 millirem cleanup standard found in Title 40 Code of Federal Regulations, Part 191

  16. Bird Pollinator Visitation is Equivalent in Island and Plantation Planting Designs in Tropical Forest Restoration Sites

    Ginger M. Thurston

    2013-03-01

    Full Text Available Active restoration is one strategy to reverse tropical forest loss. Given the dynamic nature of climates, human populations, and other ecosystem components, the past practice of using historical reference sites as restoration targets is unlikely to result in self-sustaining ecosystems. Restoring sustainable ecological processes like pollination is a more feasible goal. We investigated how flower cover, planting design, and landscape forest cover influenced bird pollinator visits to Inga edulis trees in young restoration sites in Costa Rica. I. edulis trees were located in island plantings, where seedlings had been planted in patches, or in plantation plantings, where seedlings were planted to cover the restoration area. Sites were located in landscapes with scant (10–21% or moderate (35–76% forest cover. Trees with greater flower cover received more visits from pollinating birds; neither planting design nor landscape forest cover influenced the number of pollinator visits. Resident hummingbirds and a migratory bird species were the most frequent bird pollinators. Pollination in the early years following planting may not be as affected by details of restoration design as other ecological processes like seed dispersal. Future work to assess the quality of various pollinator species will be important in assessing this idea.

  17. Tonopah Test Range Environmental Restoration Corrective Action Sites

    2010-01-01

    This report describes the status (closed, closed in place, or closure in progress) of the Corrective Action Sites (CASs) and Corrective Action Units (CAUs) at the Tonopah Test Range. CASs and CAUs where contaminants were either not detected or were cleaned up to within regulatory action levels are summarized

  18. Decrease of Environmental Radioactivity After Terminated Restoration of the Uranium Mine Site at Zirovski Vrh (Slovenia)

    Krizman, M.J.; Rojc, J.

    2011-01-01

    The uranium mining and milling complex at Zirovski vrh, located 45 km NW from Ljubljana, was in operation in the period 1985 - 1990 and produced about 452 tonnes of yellow cake. In parallel, over 0.6 million tonnes of technological tailings and 2.6 million tonnes of mine waste rock were generated and deposited on separate disposal sites in close vicinity of the mining site, with the total area of 10 hectares. The disposal sites were completely restored, mostly in the last decade. The processing plant, located in the Brebovscica valley, was decommissioned in the nineties. All provisional facilities were removed from the central site at Todraz and transferred to the mine waste deposit. The restoration works were finished in 2010, twenty years after the cessation of uranium production. Radioactive discharges and radioactivity in the environment were monitored during operation of the uranium mine, continued during restoration phases and will be monitored a certain period afterwards. The aim of this paper is to present the radioactive discharges and enhanced levels of radioactivity in the nearby environment, monitored during the operation period of the U-mine and after terminated restoration works. The most significant decreases of radioactivity after the restoration of the site were identified. The results of environmental radioactivity monitoring showed that radioactivity steadily decreased according to the different phases of the mine decommission. After restoration, radioactivity levels on the site and in close vicinity are approaching to the background levels, except for radon in air and for waters. Consequently, radiation exposure to the reference groups of the population decreased from 0.3 - 0.4 mSv per year during operation to about 0.1 mSv per year after finalized restoration works. This figure is much lower than the authorised limit of 0.3 mSv per year, set by the Slovenian competent authority. Still enhanced levels of radioactivity were found in surface

  19. Streamline-concentration balance model for in-situ uranium leaching and site restoration

    Bommer, P.M.; Schechter, R.S.; Humenick, M.J.

    1981-03-01

    This work presents two computer models. One describes in-situ uranium leaching and the other describes post leaching site restoration. Both models use a streamline generator to set up the flow field over the reservoir. The leaching model then uses the flow data in a concentration balance along each streamline coupled with the appropriate reaction kinetics to calculate uranium production. The restoration model uses the same procedure except that binary cation exchange is used as the restoring mechanism along each streamline and leaching cation clean up is simulated. The mathematical basis for each model is shown in detail along with the computational schemes used. Finally, the two models have been used with several data sets to point out their capabilities and to illustrate important leaching and restoration parameters and schemes

  20. Streamline-concentration balance model for in situ uranium leaching and site restoration

    Bommer, P.M.

    1979-01-01

    This work presents two computer models. One describes in situ uranium leaching and the other describes post leaching site restoration. Both models use a streamline generator to set up the flow field over the reservoir. The leaching model then uses the flow data in a concentration balance along each streamline coupled with the appropriate reaction kinetics to calculate uranium production. The restoration model uses the same procedure ecept that binary cation exchange is used as the restoring mechanism along each streamline and leaching cation clean up is stimulated. The mathematical basis for each model is shown in detail along with the computational schemes used. Finally, the two models have been used with several data sets to point out their capabilities and to illustrate important leaching and restoration parameters and schemes

  1. Prioritizing Sites for Protection and Restoration for Grizzly Bears (Ursus arctos) in Southwestern Alberta, Canada.

    Braid, Andrew C R; Nielsen, Scott E

    2015-01-01

    As the influence of human activities on natural systems continues to expand, there is a growing need to prioritize not only pristine sites for protection, but also degraded sites for restoration. We present an approach for simultaneously prioritizing sites for protection and restoration that considers landscape patterns for a threatened population of grizzly bears (Ursus arctos) in southwestern Alberta, Canada. We considered tradeoffs between bottom-up (food resource supply) and top-down (mortality risk from roads) factors affecting seasonal habitat quality for bears. Simulated annealing was used to prioritize source-like sites (high habitat productivity, low mortality risk) for protection, as well as sink-like sites (high habitat productivity, high mortality risk) for restoration. Priority source-like habitats identified key conservation areas where future developments should be limited, whereas priority sink-like habitats identified key areas for mitigating road-related mortality risk with access management. Systematic conservation planning methods can be used to complement traditional habitat-based methods for individual focal species by identifying habitats where conservation actions (both protection and restoration) have the highest potential utility.

  2. Prioritizing Sites for Protection and Restoration for Grizzly Bears (Ursus arctos in Southwestern Alberta, Canada.

    Andrew C R Braid

    Full Text Available As the influence of human activities on natural systems continues to expand, there is a growing need to prioritize not only pristine sites for protection, but also degraded sites for restoration. We present an approach for simultaneously prioritizing sites for protection and restoration that considers landscape patterns for a threatened population of grizzly bears (Ursus arctos in southwestern Alberta, Canada. We considered tradeoffs between bottom-up (food resource supply and top-down (mortality risk from roads factors affecting seasonal habitat quality for bears. Simulated annealing was used to prioritize source-like sites (high habitat productivity, low mortality risk for protection, as well as sink-like sites (high habitat productivity, high mortality risk for restoration. Priority source-like habitats identified key conservation areas where future developments should be limited, whereas priority sink-like habitats identified key areas for mitigating road-related mortality risk with access management. Systematic conservation planning methods can be used to complement traditional habitat-based methods for individual focal species by identifying habitats where conservation actions (both protection and restoration have the highest potential utility.

  3. Environmental impact statement on the siting of nuclear power plants: scoping summary report

    1981-12-01

    The NRC staff has completed its scoping process for the Environmental Impact Statement for the revision of its regulations on the siting of nuclear power plants. The rulemaking and environmental review have been focused to concentrate on significant issues and alternatives and to delete items from the rulemaking on which it is not appropriate to proceed at this time. A brief discussion of the major comments is included

  4. Characterization of site geochemistry in support of environmental restoration

    Morris, D.E.; Conradson, S.D.; Tait, C.D.; Chisholm-Brause, C.J.; Berg, J.M.; Musgrave, J.

    1992-01-01

    The objective of this analytical support task is to characterize the chemical speciation and physical properties of actinides and other toxic metals together with organic cocontaminants in contaminated soils at DOLE facilities. The target information for chemical speciation will be the oxidation state of the metal, the chemical structure and stoichiometry of the metal complexes, and the binding mechanism(s) of the metal complexes to the soil substrates. The physical state of the metal complexes in the soils is also important. We will determine if they exist as surface precipitates, mineral coatings, and/or clay adsorbates. The chemical speciation and physical state of the actinides and toxic metal define the chemistry of these contaminants as they presently exist at the DOE sites. This information is made available to parties involved in devising and implementing remediation strategies so that appropriate, efficient, timely, and cost-effective remediation technologies will be brought to bear on the problem. Speciation characterization is also undertaken following the application of remediation technologies. This information is made available to parties involved with risk assessment so that judgments concerning the extent of decontamination and the long-term stability of any remaining contamination can be made and documented on the basis of sound chemical data

  5. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility. Volume 2, Revision 2

    Weekes, D.C.; Lindsey, K.A.; Ford, B.H.; Jaeger, G.K.

    1996-12-01

    This document is Volume 2 in a two-volume series that comprise the site characterization report, the Preoperational Baseline and Site Characterization Report for the Environmental Restoration Disposal Facility. Volume 1 contains data interpretation and information supporting the conclusions in the main text. This document presents original data in support of Volume 1 of the report. The following types of data are presented: well construction reports; borehole logs; borehole geophysical data; well development and pump installation; survey reports; preoperational baseline chemical data and aquifer test data. Five groundwater monitoring wells, six deep characterization boreholes, and two shallow characterization boreholes were drilled at the Environmental Restoration Disposal Facility (ERDF) site to directly investigate site-specific hydrogeologic conditions

  6. Manual on restoration strategies for radioactive-contaminated sites. RESTRAT-TD 14

    Zeevaert, T.; Brendler, V.; Nordlinder, S.; Hedemann Jensen, P.; Bousher, A.

    1999-06-01

    This report is submitted as Technical Deliverable No. 14 against the requirements of the RESTRAT (Restoration Strategies for radioactively contaminated Sites and their Close Surroundings) Project. In this manual the methodology for ranking restoration options is explained and applied to example sites that are representative for major categories of contaminated sites. Potentially relevant techniques for restoration of contaminated sites are identified and characterised and the data collected included on a CD-ROM. For the ranking of the restoration options, a multi-attribute utility (MAU) type of analysis has been chosen with a view to the various categories of attributes that are being taken into account: radiological health detriment; economic costs; social factors. The methods of assessing the attributes and converting the attribute values into utility values for the scoring of the options are explained. The models applied for assessing the collective dose to the population and for the ranking of the remediation options (MAU analysis) are explained and the software included on two CD-ROMs added to the manual

  7. Mine tailings composition in a historic site: implications for ecological restoration.

    Courtney, R

    2013-02-01

    Ecological restoration, using tolerant plant species and nutrient additions, is a low-cost option to decrease environmental risks associated with mine tailings. An attempt was previously made to establish such a vegetation cover on an abandoned tailings facility in Southern Ireland. Historically, the tailings site has been prone to dusting and is a potential source of contamination to the surrounding environment. The site was examined to determine the success of the previous restoration plan used to revegetate the site and to determine its suitability for further restoration. Three distinct floristic areas were identified (grassland, poor grassland and bare area) based on herbage compositions and elemental analysis. Surface and subsurface samples were taken to characterise tailings from within these areas of the tailings site. The pH of bare surface tailings (pH, 2.7) was significantly more acidic (p tailings being hostile to plant growth. Total metal concentrations in tailings were high (c. 10,000 mg kg(-1) for Pb and up to 20,000 mg kg(-1) for Zn). DTPA-extractable Zn and Pb were 16 and 11 % of the total amount, respectively. Metal content in grasses growing on some areas of the tailings were elevated and demonstrated the inability of the tailings to support sustainable plant growth. Due to the inherently hostile characteristics of these areas, future restoration work will employ capping with a barrier layer.

  8. Manual on restoration strategies for radioactive-contaminated sites. RESTRAT-TD 14

    Zeevaert, T.; Brendler, V.; Nordlinder, S.; Hedemann Jensen, P.; Bousher, A

    1999-06-01

    This report is submitted as Technical Deliverable No. 14 against the requirements of the RESTRAT (Restoration Strategies for radioactively contaminated Sites and their Close Surroundings) Project. In this manual the methodology for ranking restoration options is explained and applied to example sites that are representative for major categories of contaminated sites. Potentially relevant techniques for restoration of contaminated sites are identified and characterised and the data collected included on a CD-ROM. For the ranking of the restoration options, a multi-attribute utility (MAU) type of analysis has been chosen with a view to the various categories of attributes that are being taken into account: radiological health detriment; economic costs; social factors. The methods of assessing the attributes and converting the attribute values into utility values for the scoring of the options are explained. The models applied for assessing the collective dose to the population and for the ranking of the remediation options (MAU analysis) are explained and the software included on two CD-ROMs added to the manual.

  9. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 1

    Lambert, K.A.; Mitchell, M.M.; Jean, D.; Brown, C.; Byrd, C.S.

    1997-09-01

    This report describes the survey and removal of radioactive surface contamination at Sandia's Environmental Restoration (ER) sites. Radiological characterization was performed as a prerequisite to beginning the Resource Conservation and Recovery Act (RCRA) corrective action process. The removal of radioactive surface contamination was performed in order to reduce potential impacts to human health and the environment. The predominant radiological contaminant of concern was depleted uranium (DU). Between October 1993 and November 1996 scanning surface radiation surveys, using gamma scintillometers, were conducted at 65 sites covering approximately 908 acres. A total of 9,518 radiation anomalies were detected at 38 sites. Cleanup activities were conducted between October 1994 and November 1996. A total of 9,122 anomalies were removed and 2,072 waste drums were generated. The majority of anomalies not removed were associated with a site that has subsurface contamination beyond the scope of this project. Verification soil samples (1,008 total samples) were collected from anomalies during cleanup activities and confirm that the soil concentration achieved in the field were far below the target cleanup level of 230 pCi/g of U-238 (the primary constituent of DU) in the soil. Cleanup was completed at 21 sites and no further radiological action is required. Seventeen sites were not completed since cleanup activities wee precluded by ongoing site activity or were beyond the original project scope

  10. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 1

    Lambert, K.A.; Mitchell, M.M. [Brown and Root Environmental, Albuquerque, NM (United States); Jean, D. [MDM/Lamb, Inc., Albuquerque, NM (United States); Brown, C. [Environmental Dimensions, Inc., Albuquerque, NM 87109 (United States); Byrd, C.S. [Sandia National Labs., Albuquerque, NM (United States)

    1997-09-01

    This report describes the survey and removal of radioactive surface contamination at Sandia`s Environmental Restoration (ER) sites. Radiological characterization was performed as a prerequisite to beginning the Resource Conservation and Recovery Act (RCRA) corrective action process. The removal of radioactive surface contamination was performed in order to reduce potential impacts to human health and the environment. The predominant radiological contaminant of concern was depleted uranium (DU). Between October 1993 and November 1996 scanning surface radiation surveys, using gamma scintillometers, were conducted at 65 sites covering approximately 908 acres. A total of 9,518 radiation anomalies were detected at 38 sites. Cleanup activities were conducted between October 1994 and November 1996. A total of 9,122 anomalies were removed and 2,072 waste drums were generated. The majority of anomalies not removed were associated with a site that has subsurface contamination beyond the scope of this project. Verification soil samples (1,008 total samples) were collected from anomalies during cleanup activities and confirm that the soil concentration achieved in the field were far below the target cleanup level of 230 pCi/g of U-238 (the primary constituent of DU) in the soil. Cleanup was completed at 21 sites and no further radiological action is required. Seventeen sites were not completed since cleanup activities wee precluded by ongoing site activity or were beyond the original project scope.

  11. 78 FR 68044 - Erie Boulevard Hydropower, L.P.; Notice of Scoping Meetings and Environmental Site Review and...

    2013-11-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7320-042] Erie Boulevard Hydropower, L.P.; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments.... Date filed: July 1, 2013. d. Applicant: Erie Boulevard Hydropower, L.P. e. Name of Project: Chasm...

  12. Ecological restoration of central European mining sites: a summary of a multi-site analysis

    Prach, Karel; Řehounková, Klára; Řehounek, J.; Konvalinková, Petra

    2011-01-01

    Roč. 36, č. 2 (2011), 263-268 ISSN 0142-6397 R&D Projects: GA AV ČR IAA600050702 Institutional research plan: CEZ:AV0Z60050516 Keywords : ecological restoration * mining * succession Subject RIV: EH - Ecology, Behaviour Impact factor: 0.677, year: 2011

  13. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  14. Environmental restoration and waste management site-specific plan for Richland Operations Office

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs

  15. Evaluation of habitat restoration needs at Yucca Mountain, Nevada Test Site, Nye County, Nevada

    Mitchell, D.L.

    1984-04-01

    Adverse environmental impacts due to site characterization and repository development activities at Yucca Mountain, Nevada Test Site (NTS), Nye County, Nevada, must be minimized and mitigated according to provisions of the Nuclear Waste Policy Act (NWPA) of 1982 and the National Environmental Policy Act (NEPA). The natural Transition Desert ecosystem in the 27.5-sq-mi Yucca Mountain project area is now and will continue to be impacted by removal of native vegetation and topsoil and the destruction and/or displacement of faunal communities. Although it is not known at this time exactly how much land will be affected, it is estimated that about 300 to 400 acres will be disturbed by construction of facility sites, mining spoils piles, roadways, and drilling pads. Planned habitat restoration at Yucca Mountain will mitigate the effects of plant and animal habitat loss over time by increasing the rate of plant succession on disturbed sites. Restoration program elements should combine the appropriate use of native annual and perennial species, irrigation and/or water-harvesting techniques, and salvage and reuse of topsoil. Although general techniques are well-known, specific program details (i.e., which species to use, methods of site preparation with available equipment, methods of saving and applying topsoil, etc.) must be worked out empirically on a site-specific basis over the period of site characterization and any subsequent repository development. Large-scale demonstration areas set up during site characterization will benefit both present abandonments and, if the project is scaled up to include repository development, larger facilities areas including spoils piles. Site-specific demonstration studies will also provide information on the costs per acre associated with alternative restoration strategies

  16. A spatial modeling approach to identify potential butternut restoration sites in Mammoth Cave National Park

    Thompson, L.M.; Van Manen, F.T.; Schlarbaum, S.E.; DePoy, M.

    2006-01-01

    Incorporation of disease resistance is nearly complete for several important North American hardwood species threatened by exotic fungal diseases. The next important step toward species restoration would be to develop reliable tools to delineate ideal restoration sites on a landscape scale. We integrated spatial modeling and remote sensing techniques to delineate potential restoration sites for Butternut (Juglans cinerea L.) trees, a hardwood species being decimated by an exotic fungus, in Mammoth Cave National Park (MCNP), Kentucky. We first developed a multivariate habitat model to determine optimum Butternut habitats within MCNP. Habitat characteristics of 54 known Butternut locations were used in combination with eight topographic and land use data layers to calculate an index of habitat suitability based on Mahalanobis distance (D2). We used a bootstrapping technique to test the reliability of model predictions. Based on a threshold value for the D2 statistic, 75.9% of the Butternut locations were correctly classified, indicating that the habitat model performed well. Because Butternut seedlings require extensive amounts of sunlight to become established, we used canopy cover data to refine our delineation of favorable areas for Butternut restoration. Areas with the most favorable conditions to establish Butternut seedlings were limited to 291.6 ha. Our study provides a useful reference on the amount and location of favorable Butternut habitat in MCNP and can be used to identify priority areas for future Butternut restoration. Given the availability of relevant habitat layers and accurate location records, our approach can be applied to other tree species and areas. ?? 2006 Society for Ecological Restoration International.

  17. Potential 'ecological traps' of restored landscapes: koalas Phascolarctos cinereus re-occupy a rehabilitated mine site.

    Cristescu, Romane H; Banks, Peter B; Carrick, Frank N; Frère, Céline

    2013-01-01

    With progressively increasing anthropogenic habitat disturbances, restoration of impacted landscapes is becoming a critical element of biodiversity conservation. Evaluation of success in restoration ecology rarely includes faunal components, usually only encompassing abiotic and floral components of the ecosystems. Even when fauna is explicitly included, it is usually only species presence/absence criteria that are considered. If restoration is to have a positive outcome, however, populations in restored habitats should exhibit comparable survival and reproductive rates to populations found in undisturbed surroundings. If a species recolonises restored areas but later experiences decreased fitness, restored areas could become ecological sinks or traps. We investigated this possibility in a case study of koalas Phascolarctos cinereus occupying rehabilitated mining areas on North Stradbroke Island, Australia. Our holistic approach compared rehabilitated and undisturbed areas on the basis of their vegetation characteristics, of koalas' body condition, roosting trees, diet, as well as predator index. Koalas using rehabilitated areas appeared to be able to access an adequate supply of roosting and fodder trees, were in good condition and had high reproductive output. We did not find any significant differences in predator density between rehabilitated areas and undisturbed surroundings. The results presented in this study showed there was no evidence that the post-mining rehabilitated areas constitute ecological sinks or traps. However, to reach a definitive conclusion as to whether areas rehabilitated post-mining provide at least equivalent habitat to undisturbed locations, additional research could be undertaken to assess foliar nutrient/water/toxin differences and predation risk in rehabilitated areas compared with undisturbed areas. More generally, the evaluation of whether restoration successfully produces a functional ecological community should include criteria

  18. Potential 'ecological traps' of restored landscapes: koalas Phascolarctos cinereus re-occupy a rehabilitated mine site.

    Romane H Cristescu

    Full Text Available With progressively increasing anthropogenic habitat disturbances, restoration of impacted landscapes is becoming a critical element of biodiversity conservation. Evaluation of success in restoration ecology rarely includes faunal components, usually only encompassing abiotic and floral components of the ecosystems. Even when fauna is explicitly included, it is usually only species presence/absence criteria that are considered. If restoration is to have a positive outcome, however, populations in restored habitats should exhibit comparable survival and reproductive rates to populations found in undisturbed surroundings. If a species recolonises restored areas but later experiences decreased fitness, restored areas could become ecological sinks or traps. We investigated this possibility in a case study of koalas Phascolarctos cinereus occupying rehabilitated mining areas on North Stradbroke Island, Australia. Our holistic approach compared rehabilitated and undisturbed areas on the basis of their vegetation characteristics, of koalas' body condition, roosting trees, diet, as well as predator index. Koalas using rehabilitated areas appeared to be able to access an adequate supply of roosting and fodder trees, were in good condition and had high reproductive output. We did not find any significant differences in predator density between rehabilitated areas and undisturbed surroundings. The results presented in this study showed there was no evidence that the post-mining rehabilitated areas constitute ecological sinks or traps. However, to reach a definitive conclusion as to whether areas rehabilitated post-mining provide at least equivalent habitat to undisturbed locations, additional research could be undertaken to assess foliar nutrient/water/toxin differences and predation risk in rehabilitated areas compared with undisturbed areas. More generally, the evaluation of whether restoration successfully produces a functional ecological community

  19. Development of educational programs for environmental restoration/waste management at two Department of Energy sites

    Harrison, R.J.; Toth, W.J.; Smith, T.H.

    1991-01-01

    Availability of appropriately educated personnel is perhaps the greatest obstacle faced by the nation in addressing its waste management and environmental restoration activities. The US Department of Energy (DOE) Idaho National Engineering Laboratory (INEL) and the DOE Grand Junction, Colorado, Projects Office (GJPO) have developed two educational degree programs that respond to the human resource needs of the environmental restoration/waste management effort in ways that reflect the programmatic and cultural diversity at the two sites. The INEL has worked with the University of Idaho and Idaho States University to develop a set of master's degree programs focusing on waste management and environmental restoration. GJPO has developed an associate degree program and is developing a baccalaureate program in environmental restoration with Mesa State College. The development of these two programs was coordinated through the INEL University Relations Committee. They were conceived as parts of an overall effort to provide the human resources for environmental restoration and waste management. The background, need, and development of these two programs are presented, as well as information on associated industry parternships, employee scholarship programs, and plans for integration and articulation of curricula. 3 refs

  20. Westinghouse Savannah River Site Supplier Environmental Restoration and Waste Management Information Exchange Forum

    Sturm, H.F. Jr.; Hottel, R.E.; Christoper, N.

    1994-01-01

    The Savannah River Site conducted its first Supplier Information Exchange in September 1993. The intent of the conference was to inform potential suppliers of the Savannah River Sites mission and research and development program objectives in the areas of environmental restoration and waste management, and to solicit proposals for innovative research in those areas. Major areas addressed were Solid Waste, Environmental Restoration, Environmental Monitoring, Transition/Decontamination and Decommissioning, and the Savannah River Technology Center. A total of 1062 proposals were received addressing the 89 abstracts presented. This paper will describe the forum the process for solicitation, the process for proposal review and selection, and review the overall results and benefits to Savannah River

  1. Ecosystem services provided by a former gravel extraction site in the uk under two contrasting restoration states

    Phillip J Blaen

    2016-01-01

    Full Text Available Mineral extraction sites restored for nature conservation can provide areas of high quality habitat and enhance local biodiversity, yet the ecosystem services and associated socio-economic benefits delivered by such sites are not well understood. Here we use a combination of primary field data, benefit transfer, and visitor questionnaires to assess ecosystem services provided by a former gravel mining site restored for nature conservation. We quantify the marginal benefits accrued from the site by comparing ecosystem service delivery from the current nature conservation state to delivery under a highly plausible alternative restoration state; namely a public amenity park. Our results suggest restoration for nature conservation is associated with relatively high carbon storage, but that carbon sequestration is offset to some degree by greenhouse gas fluxes from saturated reed bed areas. We demonstrate through a zonal travel-cost method and individual interviews that restoration for nature conservation contributes to local amenity value by providing specialised wildlife viewing opportunities to visitors. Our results highlight the potential ecosystem services associated with mineral sites restored for nature conservation. Notably, this study strengthens the evidence base to support the case for biodiversity-focused restoration of these extraction sites, both to the minerals industry and governmental planners, by suggesting that such restoration strategies may play an important role in contributing to human well-being without impeding economic progress.

  2. Survey of subsurface treatment technologies for environmental restoration sites at Sandia National Laboratories, New Mexico.

    McGrath, Lucas K.; Ho, Clifford Kuofei; Wright, Jerome L.

    2003-08-01

    This report provides a survey of remediation and treatment technologies for contaminants of concern at environmental restoration (ER) sites at Sandia National Laboratories, New Mexico. The sites that were evaluated include the Tijeras Arroyo Groundwater, Technical Area V, and Canyons sites. The primary contaminants of concern at these sites include trichloroethylene (TCE), tetrachloroethylene (PCE), and nitrate in groundwater. Due to the low contaminant concentrations (close to regulatory limits) and significant depths to groundwater ({approx}500 feet) at these sites, few in-situ remediation technologies are applicable. The most applicable treatment technologies include monitored natural attenuation and enhanced bioremediation/denitrification to reduce the concentrations of TCE, PCE, and nitrate in the groundwater. Stripping technologies to remove chlorinated solvents and other volatile organic compounds from the vadose zone can also be implemented, if needed.

  3. Adaptive Long-Term Monitoring at Environmental Restoration Sites (ER-0629)

    2009-05-01

    Printed on recycled paper TECHNICAL REPORT TR-2317-ENV ADAPTIVE LONG-TERM MONITORING AT ENVIRONMENTAL RESTORATION SITES (ER-0629...nondetect values. One curiosity is that the typical recent RL for TCE has been 0.5, whereas that for PCE has been 1.4. As a consequence, and due to...Spring 2000 makes little difference, however. A curiosity is that the anomalous value from Spring 2006 is actually quite similar to the early

  4. Radon levels after restoration of the U-mine disposal site

    Krizman, M.J.; Rojc, J.; Jovanovic, P.

    2010-01-01

    After cessation of the underground mining of uranium ore and production of uranium concentrate at Zirovski Vrh (Slovenia) in the period 1985-1990, two permanent surface disposal sites remained, namely, tailings pile and mine waste rock pile. Both disposal sites were of equal size of 4 hectares and were significant sources of radon. Their final restoration was designed in compliance with the condition of dose constraint for the public and authorized limits for radon exhalation from the remediated piles. In the late summer of 2008, a restoration of the mine waste pile was finished. Radon releases were reduced significantly by constructing an effective radon barrier of well compacted clay material and a thick complex protective cover layer constructed over it. Radon exhalation rate from the mine waste area was lowered from primary level of 0.7 Bq/m 2 ·s to natural levels (0.01 Bq/m 2 ·s), and consequently, ambient radon levels also decreased on the site and nearby environment. The average radon contribution from the remaining U-mine sources was estimated on the basis of the environmental measurements of radon concentrations; they dropped from initial 7-9 Bq/m 3 to approximately 3 Bq/m 3 . Further reduction of outdoor radon concentrations is expected after 2010, since the restoration of another disposal site will have been completed by the end of this year. Public exposure due to industrial radon after the first phase of restoration satisfactorily meets the dose constraint level of 0.3 mSv/y, since it decreased to less than 0.1 mSv/y. (authors)

  5. Progress in the environmental restoration at the Savannah River Site (SRS)

    Pope, J.M.; McClain, L.

    1992-01-01

    The Environmental Restoration (ER) Program has continued to achieve significant accomplishments important to the mission of cleaning up inactive waste sites, performing corrective actions on contaminated groundwater, planning for decontaminating/decommissioning surplus facilities and ensuring that the environment and the health and safety of people are protected. The multifaceted cleanup at SRS represents noteworthy milestones across the DOE complex. The associated lessons learned and key elements of the progress will be presented in the course of the paper

  6. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  7. The Hanford Site Environmental Restoration Program 1993 fiscal year work plan

    1992-09-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This document describes the overall ER Mission Area and provides FYWP appendixes for each of the five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Treatment, Storage, and/or Disposal (TSD)

  8. Invertebrate succession on open coast coal post mining sites in response to the type of restoration

    Hromádková, Šárka

    2014-01-01

    This review deals with development of invertebrates on sites after brown coal mining in response to the type of restoration. When the soil properties are improved, it is then necessary to mitigate negative threats such as landslides and erosion or low pH. The following is an overlap of fertile soil. Soil characteristics can be locally modified by diversifying of plantations of fast and slow growing wood species. After a succession of plants and the subsequent increase in litter layer, the dev...

  9. Regional patterns of declining butternut (Juglans cinerea L.) suggest site characteristics for restoration

    Morin, Randall S.; Gottschalk, Kurt W.; Ostry, Michael E.; Liebhold, Andrew M.

    2017-01-01

    Abstract Butternut trees dying from a canker disease were first reported in southwestern Wisconsin in 1967. Since then, the disease has caused extensive mortality of butternut throughout its North American range. The objectives of this study were to quantify changes in butternut populations and density across its range and identify habitat characteristics of sites where butternut is surviving in order to locate regions for potential butternut restoration. The natural range of butternut (Jugla...

  10. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  11. Optimal Site Characterization and Selection Criteria for Oyster Restoration using Multicolinear Factorial Water Quality Approach

    Yoon, J.

    2015-12-01

    Elevated levels of nutrient loadings have enriched the Chesapeake Bay estuaries and coastal waters via point and nonpoint sources and the atmosphere. Restoring oyster beds is considered a Best Management Practice (BMP) to improve the water quality as well as provide physical aquatic habitat and a healthier estuarine system. Efforts include declaring sanctuaries for brood-stocks, supplementing hard substrate on the bottom and aiding natural populations with the addition of hatchery-reared and disease-resistant stocks. An economic assessment suggests that restoring the ecological functions will improve water quality, stabilize shorelines, and establish a habitat for breeding grounds that outweighs the value of harvestable oyster production. Parametric factorial models were developed to investigate multicolinearities among in situ water quality and oyster restoration activities to evaluate posterior success rates upon multiple substrates, and physical, chemical, hydrological and biological site characteristics to systematically identify significant factors. Findings were then further utilized to identify the optimal sites for successful oyster restoration augmentable with Total Maximum Daily Loads (TMDLs) and BMPs. Factorial models evaluate the relationship among the dependent variable, oyster biomass, and treatments of temperature, salinity, total suspended solids, E. coli/Enterococci counts, depth, dissolved oxygen, chlorophyll a, nitrogen and phosphorus, and blocks consist of alternative substrates (oyster shells versus riprap, granite, cement, cinder blocks, limestone marl or combinations). Factorial model results were then compared to identify which combination of variables produces the highest posterior biomass of oysters. Developed Factorial model can facilitate maximizing the likelihood of successful oyster reef restoration in an effort to establish a healthier ecosystem and to improve overall estuarine water quality in the Chesapeake Bay estuaries.

  12. Once Upon a Toxic Sanctuary: Partnering to Restore and Reclaim a Dakota Sacred Site

    Roxanne Gould

    2017-10-01

    Full Text Available In this article, we examine the role of partnerships as they relate to the destruction and reconstruction of Wakaŋ Tipi and Indian Mounds Park as a Dakota sacred feminine, origin, birth site through a theoretical lens of critical Indigenous pedagogy of place (Trinidad, 2016 and partnership studies (Eisler, 2005. We discuss the deep historical, social, psychological, and cultural relationship the Dakota have to this sacred site and the challenge of partnering with non-Dakota entities to restore Wakaŋ Tipi/Indian Mounds Park from a toxic waste dump to a spiritual sanctuary.

  13. Impact of peatland restoration on nutrient and carbon leaching from contrasting sites in southern Finland

    Vasander, Harri; Sallantaus, Tapani; Koskinen, Markku

    2010-05-01

    Impacts of peatland restoration on nutrient and carbon leaching from contrasting sites in southern Finland Tapani Sallantaus1, Markku Koskinen2, Harri Vasander2 1)Finnish Environment Institute, Biodiversity unit, Box 140, FIN-00251 Helsinki, Finland, tapani.sallantaus@ymparisto.fi 2)Department of Forest Sciences, University of Helsinki, Box 27, FIN-00014 University of Helsinki, Finland, markku.koskinen@helsinki.fi, harri.vasander@helsinki.fi Less than 20 % of the original mire area of southern Finland is still in natural state. Even many peatlands in today's nature conservation areas had been partly or totally drained before conservation. Until now, about 15000 ha of peatlands have been restored in conservation areas. Here we present data concerning changes in leaching due to restoration in two contrasting areas in southern Finland. The peatlands in Seitseminen have originally been fairly open, growing stunted pine, and unfertile, either bogs or poor fens. The responses of tree stand to drainage in the 1960s were moderate, and the tree stand before restoration was about 50 m3/ha, on average. The trees were partly harvested before filling in the ditches mainly in the years 1997-1999 . The peatlands of Nuuksio are much more fertile than those in Seitseminen, and had greatly responded to drainage, which took place already in the 1930s and 1950s. The tree stand consisted mainly of spruce and exceeded 300 m3/ha in large part of the area. The ditches were dammed in the autumn 2001 and the tree stand was left standing. Runoff water quality was monitored in three basins in both areas. To obtain the leaching rates, we used simulated runoff data obtained from the Finnish Environment Institute, Hydrological Services Division. The responses in leaching were in the same direction in both cases. However, especially when calculated per restored hectare (Table 1), the responses were much stronger in the more fertile areas of Nuuksio for organic carbon and nitrogen, but not so much

  14. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

    2008-01-01

    This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (FFACO, 1996 (as amended February 2008)). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. (1) CAS 01-23-02, Atmospheric Test Site - High Alt; (2) CAS 02-23-02, Contaminated Areas (2); (3) CAS 02-23-03, Contaminated Berm; (4) CAS 02-23-10, Gourd-Amber Contamination Area; (5) CAS 02-23-11, Sappho Contamination Area; (6) CAS 02-23-12, Scuttle Contamination Area; (7) CAS 03-23-24, Seaweed B Contamination Area; (8) CAS 03-23-27, Adze Contamination Area; (9) CAS 03-23-28, Manzanas Contamination Area; (10) CAS 03-23-29, Truchas-Chamisal Contamination Area; (11) CAS 04-23-02, Atmospheric Test Site T4-a; (12) CAS 05-23-06, Atmospheric Test Site; (13) CAS 09-23-06, Mound of Contaminated Soil; (14) CAS 10-23-04, Atmospheric Test Site M-10; and (15) CAS 18-23-02, U-18d Crater (Sulky). Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107. CAU 107 closure activities will consist of verifying that the current postings required under Title 10 Code of Federal Regulations (CFR) Part 835 are in place and implementing use restrictions (URs) at two sites, CAS 03-23-29 and CAS 18-23-02. The current radiological postings combined with the URs are adequate administrative controls to limit site access and worker dose

  15. Summary of operations and performance of the Murdock site restoration project in June 2005-December 2006.

    LaFreniere, L. M.; Environmental Science Division

    2007-05-31

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the initial period of systems operation, from June 2005 through December 2006. In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the initial period of operation.

  16. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  17. Off-site training of laparoscopic skills, a scoping review using a thematic analysis.

    Thinggaard, Ebbe; Kleif, Jakob; Bjerrum, Flemming; Strandbygaard, Jeanett; Gögenur, Ismail; Matthew Ritter, E; Konge, Lars

    2016-11-01

    The focus of research in simulation-based laparoscopic training has changed from examining whether simulation training works to examining how best to implement it. In laparoscopic skills training, portable and affordable box trainers allow for off-site training. Training outside simulation centers and hospitals can increase access to training, but also poses new challenges to implementation. This review aims to guide implementation of off-site training of laparoscopic skills by critically reviewing the existing literature. An iterative systematic search was carried out in MEDLINE, EMBASE, ERIC, Scopus, and PsychINFO, following a scoping review methodology. The included literature was analyzed iteratively using a thematic analysis approach. The study was reported in accordance with the STructured apprOach to the Reporting In healthcare education of Evidence Synthesis statement. From the search, 22 records were identified and included for analysis. A thematic analysis revealed the themes: access to training, protected training time, distribution of training, goal setting and testing, task design, and unsupervised training. The identified themes were based on learning theories including proficiency-based learning, deliberate practice, and self-regulated learning. Methods of instructional design vary widely in off-site training of laparoscopic skills. Implementation can be facilitated by organizing courses and training curricula following sound education theories such as proficiency-based learning and deliberate practice. Directed self-regulated learning has the potential to improve off-site laparoscopic skills training; however, further studies are needed to demonstrate the effect of this type of instructional design.

  18. Developing a GIS to facilitate data analysis for environmental restoration of a large waste site

    Tzemos, S.; Evans, B.J.; White, M.E.

    1991-05-01

    The Hanford Site area located southeastern Washington State and is a US Department of Energy Superfund cleanup site. The site contains a complex mixture of chemical and radioactive pollutants, which makes environmental monitoring, analysis, and restoration a complicated task. The Hanford Environmental Information System (HEIS) has been developed to manage the data generated from the characterization and environmental monitoring of the Hanford Site. The Geographic Information Systems (GIS) component of HEIS, known as HEISGIS, is being developed to help scientists spatially analyze the environmental data stored in the HEIS database and provide an integrated system for environmental restoration. HEISGIS is in its second stage of development. The first stage produced a working prototype. The second stage focuses on improvements in data accuracy, data standardization, analytical modeling capabilities, interfaces between the various software packages, and the graphical user interface. This paper describes the development of the HEISGIS and summarizes the considerations and difficulties encountered in the integration of the GIS with a large relational database. 1 ref., 1 fig., 3 tabs

  19. Overview of IAEA activities in restoration of former uranium mining and milling sites

    Falck, W.E.

    2000-01-01

    The IAEA has increasingly become concerned with the radiological and environmental impact of closed uranium mining and milling facilities. It is recognised that inappropriate practices in waste management and the lack of closeout plans have lead to environmental hazards and the potential for human exposure world-wide. In many instances the operators or those responsible for radiation and environmental protection lacked the experience in planning and executing remediation and restoration projects. Through a series of technical documents and other means, which are reviewed briefly in this paper, the IAEA strives to provide guidance and examples for the selection and application of adequate remediation technologies and restoration practices. Emphasis is put upon a comprehensive planning process leading to technology selection. This process commences with proper site characterisation on the basis of which a strategy is to be developed and finishes with post-closure monitoring as an integral instrument of quality control and quality assurance. (author)

  20. Overview of IAEA activities in restoration of former uranium mining and milling sites

    Falck, W.E.

    2002-01-01

    The IAEA has increasingly become concerned with the radiological and environmental impact of closed uranium mining and milling facilities. It is recognized that inappropriate practices in waste management and the lack of closeout plans have lead to environmental hazards and the potential for human exposure worldwide. In many instances the operators or those responsible for radiation and environmental protection lacked the experience in planning and executing remediation and restoration projects. Through a series of technical documents and other means, which are reviewed briefly in this paper, the IAEA strives to provide guidance and examples for the selection and application of adequate remediation technologies and restoration practices. Emphasis is put upon a comprehensive planning process leading to technology selection. This process commences with proper site characterisation on the basis of which a strategy is to be developed and finishes with post-closure monitoring as an integral instrument of quality control and quality assurance. (author)

  1. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

    2009-01-01

    This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (1996 (as amended February 2008)). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. (sm b ullet) CAS 01-23-02, Atmospheric Test Site - High Alt(sm b ullet) CAS 02-23-02, Contaminated Areas (2)(sm b ullet) CAS 02-23-03, Contaminated Berm(sm b ullet) CAS 02-23-10, Gourd-Amber Contamination Area(sm b ullet) CAS 02-23-11, Sappho Contamination Area(sm b ullet) CAS 02-23-12, Scuttle Contamination Area(sm b ullet) CAS 03-23-24, Seaweed B Contamination Area(sm b ullet) CAS 03-23-27, Adze Contamination Area(sm b ullet) CAS 03-23-28, Manzanas Contamination Area(sm b ullet) CAS 03-23-29, Truchas-Chamisal Contamination Area(sm b ullet) CAS 04-23-02, Atmospheric Test Site T4-a(sm b ullet) CAS 05-23-06, Atmospheric Test Site(sm b ullet) CAS 09-23-06, Mound of Contaminated Soil(sm b ullet) CAS 10-23-04, Atmospheric Test Site M-10(sm b ullet) CAS 18-23-02, U-18d Crater (Sulky) Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107.

  2. First detection in the USA: new plant pathogen, Phytophthora tentaculata, in native plant nurseries and restoration sites in California

    S. Rooney-Latham; C. L. Blomquist; T. Swiecki; E. Bernhardt; S.J. Frankel

    2015-01-01

    Phytophthora tentaculata Kröber & Marwitz, has been detected in several native plant nurseries in 4 California counties and in restoration sites on orange sticky monkey flower (Diplacus aurantiacus subsp. aurantiacus (W. Curtis) Jeps. [Scrophulariaceae]), toyon (Heteromeles...

  3. The use of institutional controls at Department of Energy Oak Ridge Field Office environmental restoration sites

    White, R.K.; Swindle, D.W.; Redfearn, A.; King, A.D.

    1992-01-01

    This report summarizes some of the major issues related to the use of institutional controls at hazardous waste sites under the auspices of the Department of Energy Field Office, Oak Ridge/Environmental Restoration (DOE-OR/ER) Division. In particular, the report addresses the impacts that assumptions regarding institutional controls have on the results and interpretation of the risk assessment, both in the Remedial Investigation (RI) and the Feasibility Study (FS). Environmental restoration activities at DOE-OR/ER sites are primarily driven by CERCLA. Therefore, the report focuses on the approaches and assumptions relating to institutional controls under CERCLA. Also the report briefly outlines approaches adopted under other authorities such as RCRA and radiation regulatory authorities (such as NRC regulations/guidance, DOE orders, and EPA standards) in order to contrast these approaches to those adopted under CERCLA. In order to demonstrate the implications of the use of institutional controls at DOE facilities, this report summarizes the approaches and results of the recent baseline risk assessment for Solid Waste Storage Area 6 at Oak Ridge National Laboratory. The report concludes with possible options on the use of institutional controls at DOE-OR/ER sites

  4. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility

    Weekes, D.C.; Ford, B.H.; Jaeger, G.K.

    1996-09-01

    This document Volume 2 in a two-volume series that comprise the site characterization report for the Environmental Restoration Disposal Facility. Volume 1 contains data interpretation and information supporting the conclusions in the main text. This document presents original data in support of Volume 1 of the report. The following types of data are presented: well construction reports; borehole logs; borehole geophysical data; well development and pump installation; survey reports; and preoperational baseline chemical data and aquifer test data. This does not represent the entire body of data available. Other types of information are archived at BHI Document Control. Five ground water monitoring wells were drilled at the Environmental Restoration Disposal Facility site to directly investigate site- specific hydrogeologic conditions. Well and borehole activity summaries are presented in Volume 1. Field borehole logs and geophysical data from the drilling are presented in this document. Well development and pump installation sheets are presented for the groundwater monitoring wells. Other data presented in this document include borehole geophysical logs from existing wells; chemical data from the sampling of soil, vegetation, and mammals from the ERDF to support the preoperational baseline; ERDF surface radiation surveys;a nd aquifer testing data for well 699-32-72B

  5. Restoring of offshore wind farm sites. Lillgrund Pilot Project; Aaterstaellande av havsbaserad vindkraft. Lillgrund Pilot Projekt

    Stumle Wikander, Jhenny (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    This report focuses on the legal aspects of decommissioning and restoring of offshore wind farm sites, as part of an extensive report on the Lillgrund Offshore Wind Farm Pilot Project. For this analysis, all permit conditions of the granted permits for the offshore wind parks in Sweden have been collected and studied. According to the Swedish Environmental code 'the validity of a permit, approval or exemption may be made subject to the requirement that the person who intends to pursue the activity must furnish a security for the costs of after-treatment and any other restoration measures that may be necessary as a result. The state, municipalities, county councils and associations of municipalities shall not be required to furnish a security. If there is cause to assume that the security furnished is no longer sufficient, the authority which is considering the application for a permit, approval or exemption may require an additional security to be furnished'. The permits show that different types of securities are being used, with bank warranties and securities being the most common. Securities are either fixed and furnished prior to start of construction or start of operations, or they are obtained gradually over the life of the project. Among the twelve permits studied, a gradual tendency to use a combination of the two alternatives can bee seen. The conditions governing when an offshore wind farm is to be discontinued and which parts need to be partly or fully removed from the site are obviously of future importance. The issue has been addressed to different degrees in the permits, some to a clear legal extent, while others are more general. The Lillgrund Offshore Wind Farm was secured for 60 million SEK. The extent to which the park is to be decommissioned and the site to be restored is decided by the county administrative board once production is terminated

  6. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program's management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention

  7. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program`s management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention.

  8. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as ''the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as ''the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs

  9. A systematic approach to evaluate erosion potential at environmental restoration sites

    Veenis, S.J.; Mays, D.C.

    1998-01-01

    The Environmental Restoration (ER) Project at the Los Alamos National Laboratory (LANL) is responsible for investigation and remediation of solid waste management units (SWMUs) under the Resource Conservation and Recovery Act and area of concerns (AOCs) under the direction of the Department of Energy. During the investigation and remediation phases, information may be gathered that indicates that conditions may be present at the site which may effect surface water quality. Depending on the constituent found, its concentration, and erosion/sediment transport potential, it may be necessary to implement temporary or permanent mitigative measures

  10. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation

    1993-01-01

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94

  11. Social media and rating sites as tools to understanding quality of care: a scoping review.

    Verhoef, Lise M; Van de Belt, Tom H; Engelen, Lucien J L P G; Schoonhoven, Lisette; Kool, Rudolf B

    2014-02-20

    Insight into the quality of health care is important for any stakeholder including patients, professionals, and governments. In light of a patient-centered approach, it is essential to assess the quality of health care from a patient's perspective, which is commonly done with surveys or focus groups. Unfortunately, these "traditional" methods have significant limitations that include social desirability bias, a time lag between experience and measurement, and difficulty reaching large groups of people. Information on social media could be of value to overcoming these limitations, since these new media are easy to use and are used by the majority of the population. Furthermore, an increasing number of people share health care experiences online or rate the quality of their health care provider on physician rating sites. The question is whether this information is relevant to determining or predicting the quality of health care. The goal of our research was to systematically analyze the relation between information shared on social media and quality of care. We performed a scoping review with the following goals: (1) to map the literature on the association between social media and quality of care, (2) to identify different mechanisms of this relationship, and (3) to determine a more detailed agenda for this relatively new research area. A recognized scoping review methodology was used. We developed a search strategy based on four themes: social media, patient experience, quality, and health care. Four online scientific databases were searched, articles were screened, and data extracted. Results related to the research question were described and categorized according to type of social media. Furthermore, national and international stakeholders were consulted throughout the study, to discuss and interpret results. Twenty-nine articles were included, of which 21 were concerned with health care rating sites. Several studies indicate a relationship between information

  12. Remediation alternatives and costs for the restoration of MGP sites. Topical report, May 1990. Documentation

    1990-03-01

    The Gas Research Institute (GRI) has embarked on a multi-year program to address the Management of Manufactured Gas Plant (MGP) Sites. The program focuses on three primary technical areas: site investigation, risk assessment, and site restoration. Program activities in each of these areas are separated into two phases. Phase 1 emphasizes the identification, collation, and analysis of the state-of-the-art applicable to specific MGP site situations. Phase 2 involves the generation of data through targeted research and development projects. The second phase of the program is producing a series of topical reports, such as this one, from laboratory and field experimental test programs. These programs are designed to fill data gaps required for the effective management of these sites and to advance the state-of-the-art for technologies determined during Phase 1 as potentially applicable to MGP site wastes. Other reports from the second phase will continue to be produced through 1991 as various portions of the program are completed

  13. Technical considerations for the implementation of subsurface microbial barriers for restoration of groundwater at UMTRA sites

    Tucker, M.D.

    1996-01-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Program is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the United States. The surface remediation phase, which has primarily focused on containment and stabilization of the abandoned uranium mill tailings piles, is nearing completion. Attention has now turned to the groundwater restoration phase. One alternative under consideration for groundwater restoration at UMTRA sites is the use of in-situ permeable reactive subsurface barriers. In this type of a system, contaminated groundwater will be allowed to flow naturally through a barrier filled with material which will remove hazardous constituents from the water by physical, chemical or microbial processes while allowing passage of the pore water. The subject of this report is a reactive barrier which would remove uranium and other contaminants of concern from groundwater by microbial action (i.e., a microbial barrier). The purpose of this report is to assess the current state of this technology and to determine issues that must be addressed in order to use this technology at UMTRA sites. The report focuses on six contaminants of concern at UMTRA sites including uranium, arsenic, selenium, molybdenum, cadmium and chromium. In the first section of this report, the fundamental chemical and biological processes that must occur in a microbial barrier to control the migration of contaminants are described. The second section contains a literature review of research which has been conducted on the use of microorganisms to immobilize heavy metals. The third section addresses areas which need further development before a microbial barrier can be implemented at an UMTRA site

  14. Technical considerations for the implementation of subsurface microbial barriers for restoration of groundwater at UMTRA sites

    Tucker, M.D.

    1996-01-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Program is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the United States. The surface remediation phase, which has primarily focused on containment and stabilization of the abandoned uranium mill tailings piles, is nearing completion. Attention has now turned to the groundwater restoration phase. One alternative under consideration for groundwater restoration at UMTRA sites is the use of in-situ permeable reactive subsurface barriers. In this type of a system, contaminated groundwater will be allowed to flow naturally through a barrier filled with material which will remove hazardous constituents from the water by physical, chemical or microbial processes while allowing passage of the pore water. The subject of this report is a reactive barrier which would remove uranium and other contaminants of concern from groundwater by microbial action (i.e., a microbial barrier). The purpose of this report is to assess the current state of this technology and to determine issues that must be addressed in order to use this technology at UMTRA sites. The report focuses on six contaminants of concern at UMTRA sites including uranium, arsenic, selenium, molybdenum, cadmium and chromium. In the first section of this report, the fundamental chemical and biological processes that must occur in a microbial barrier to control the migration of contaminants are described. The second section contains a literature review of research which has been conducted on the use of microorganisms to immobilize heavy metals. The third section addresses areas which need further development before a microbial barrier can be implemented at an UMTRA site.

  15. Summary of operations and performance of the Murdock site restoration project in 2008.

    LaFreniere, L. M.; Environmental Science Division

    2009-06-04

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the third full year of system operation, from January 1 through December 31, 2008. Performance in June 2005 through December 2007 was reported previously (Argonne 2007, 2008). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A.

  16. Scoping assessment of groundwater doses to biota at the Sellafield site, UK

    McDonald, P.; Gleizon, P.; Coleman, I.A.; Watts, S.J.; Batlle, L.V.; Smith, A.D.

    2008-01-01

    In the current climate of investigating the impact of discharges from the nuclear industry on non-human biota, much attention has been given to biota in marine and terrestrial environments in receipt of authorised discharges of liquid and gaseous effluent. Relatively little attention to date has been given to the exposure of biota to groundwater containing man-made radio-nuclides. This area of interest is growing especially in the field of nuclear waste repositories. A scoping assessment has been performed here to determine the impacts due to radiological contamination on organisms living within or coming into contact with groundwater at the Sellafield site, UK. The following potential exposure routes to biota were identified: 1) Organisms living within groundwater; 2) Groundwater discharges to the surface at beach springs (i.e. emerging above the low water line; 3) Groundwater discharges to nearby surface water bodies (e.g. rivers); 4) Groundwater discharges directly to the Irish Sea.. In order to evaluate impacts on organisms living within, contacting or ingesting groundwater, it was necessary to determine the activity concentration of radio-nuclides in the groundwater. For time periods up to 2120, modeling of contaminant release from in-ground inventories and transport in groundwater was carried out for this scoping study using a relatively simple assessment methodology with the MONDRIAN modeling suite. Screening assessments of radiological impacts upon wildlife have been performed for liquid discharges to groundwater from the Sellafield Ltd reprocessing plant at Sellafield, Cumbria. Impacts have been considered for biota at sites within reach of the groundwater flow network. Most calculated total weighted absorbed doses appear to be of no radiological significance whatsoever in relation to the new Environment Agency freshwater ecosystem trigger level (40 microGy h -1 ), thereby obviating the need to conduct further investigations. The one exception to this is

  17. Natural resource risk and cost management in environmental restoration: Demonstration project at the Savannah River Site

    Bascietto, J.J.; Sharples, F.E.

    1995-01-01

    The US Department of Energy (DOE) is both a trustee for the natural resources present on its properties and the lead response agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As such, DOE is addressing the destruction or loss of those resources caused by releases of hazardous substances from its facilities (DOE 1991) and collecting data to be used in determining the extent of contamination at its facilities, estimating risks to human health and the environment, and selecting appropriate remedial actions. The remedial investigation/feasibility study (RI/FS) process is used to investigate sites and select remedial actions. A Natural Resource Damage Assessment (NRDA) process may be used to determine whether natural resources have also been injured by the released hazardous substances and to calculate compensatory monetary damages to be used to restore the natural resources. In FY 1994, the Savannah River Site (SRS) was chosen to serve as a demonstration site for testing the integrated NRDA framework and demonstrating how NRDA concerns might be integrated into the environmental restoration activities of an actual site that is characteristically large and complex. The demonstration project (1) provided a means to illustrate the use of complex analyses using real information on the specific natural resources of the SRS; (2) served as a vehicle for reinforcing and expanding the SRS staff's understanding of the links between the NRDA and RI/FS processes; (3) provided a forum for the discussion of strategic issues with SRS personnel; and (4) allowed the refining and elaboration of DOE guidance by benchmarking the theoretical process using real information and issues

  18. Delivering Regulatory Consents for Decommissioning and Restoration of the Dounreay Nuclear Licensed Site

    Crawford, R.W.; Zyda, P.W.

    2006-01-01

    On behalf of the Nuclear Decommissioning Authority (NDA) the United Kingdom Atomic Energy Authority (UKAEA) has implemented a strategy to translate the near-term Dounreay restoration plan into a suite of land use documents designed to deliver the necessary planning consents to decommission and restore the Dounreay Nuclear Licensed Site. The legal consents and authorizations required to enable UKAEA to commence major projects and progress the decommissioning of the site are highlighted along with the measures taken to secure political, public and regulatory acceptance at the earliest opportunity. The approach taken by UKAEA is explained, focusing particularly on the critical need to secure planning permission and stakeholder approval well before the onset of construction works. The intention is to realize the benefits of forging a close working relationship with the land use regulator, The Highland Council. UKAEA has taken an approach to suitably inform the planning authority, in particular, the production of the Dounreay Planning Framework (DPF) document. This paper describes the role and need for the DPF, focusing on the key purpose of amending the local development plan to secure supportive planning policies and to set a land use context for the subsequent site decommissioning and restoration. This also has the advantage of securing public acceptance through an established legal process. Strategic milestones subsequent to the Highland Council's adoption of the DPF are highlighted, including the submission of phased planning applications and compliance with environmental legislation generally. The paper describes and underscores the need for early engagement of other regulators in the planning process such as the Scottish Environment Protection Agency (SEPA), and the safety regulator, the Nuclear Installations Inspectorate (NII). It describes the linkages amongst land use consents, Best Practicable Environmental Options (BPEO), radioactive substances

  19. Resource Conservation and Recovery Act industrial site environmental restoration site characterization plan: Area 23, Building 650 Leachfield

    1997-03-01

    This plan presents the strategy for the characterization of Corrective Action Unit 94, Area 23, Building 650 Leachfield. It is a land disposal unit, located southeast of Building 650, that was in operation from 1965 to October 1992, with an estimated annual discharge rate of less than 984 liters from designated sinks, floor drains, and emergency decontamination showers in Building 650. The objectives of the planned activities are to: obtain sufficient sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site: and obtain sufficient sample analytical data for management of investigation-derived waste (IDW). All references to regulations in this plan are to the versions of the regulations that are current at the time of publication of this plan. The scope of the characterization will include subsurface soil boring (i.e., drilling), in situ sampling of the soil within subsurface soil borings, and sample analysis for both site characterization and waste management purposes

  20. Restoration of the former site of the institute for nuclear physics research in Amsterdam

    Louwrier, Pieter W.F.; Bakker, C.N.M.; Peperkamp, J.A.M.

    2000-01-01

    In 1946 the Institute for Nuclear Physics Research (IKO) started operations on the site of an old gas factory made available by the City of Amsterdam. In 1997 IKO became part of the National Institute for Nuclear Physics and High-Energy Physics (NIKHEF). In 1996 NIKHEF left the laboratory site after 50 years of occupation. The City of Amsterdam, being the owner of the area, decided that in view of the plants for development of the area, the buildings should be demolished and the area made suitable for public use. The site was used as a nuclear research laboratory since 1946, housing a synchrocyclotron from 1947 to 1977 and a linear electron accelerator from 1968 to 1977. Several nuclear chemistry laboratories were in operation from 1946 to 1984. During the 50-year period the original buildings were modified and enlarged, and new buildings were added. Before the responsibility for the area could be transferred to the City and the operating licence could be adjusted to the new situation the Dutch authorities required that a site restoration project be executed. The site restoration project was planned in stages, each of which was supervised and evaluated by the Dutch Ministry of Housing, Spatial Planning and the Environment, and the Ministry of Social Affairs and Employment. Special interest groups such as Greenpeace, LAKA Foundation (a non-profit organisation acting as a consultant for the neighbouring population), the City of Amsterdam and the local City-Boards were following the process closely. The project encompassed the following stages: Set-up of a plan for the clearance of the building structures, including the criteria for release, in consultation with the ministries involved. Radiation protection was an integral part of the plan. Investigation of possible radioactive contamination of the evacuated buildings. Six undocumented contaminations and one documented contamination were identified. Supervised removal of contaminated building structures by a

  1. Classifications for Coastal Wetlands Planning, Protection and Restoration Act site-specific projects: 2008 and 2009

    Jones, William R.; Garber, Adrienne

    2012-01-01

    The Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) funds over 100 wetland restoration projects across Louisiana. Integral to the success of CWPPRA is its long-term monitoring program, which enables State and Federal agencies to determine the effectiveness of each restoration effort. One component of this monitoring program is the analysis of high-resolution, color-infrared aerial photography at the U.S. Geological Survey's National Wetlands Research Center in Lafayette, Louisiana. Color-infrared aerial photography (9- by 9-inch) is obtained before project construction and several times after construction. Each frame is scanned on a photogrametric scanner that produces a high-resolution image in Tagged Image File Format (TIFF). By using image-processing software, these TIFF files are then orthorectified and mosaicked to produce a seamless image of a project area and its associated reference area (a control site near the project that has common environmental features, such as marsh type, soil types, and water salinities.) The project and reference areas are then classified according to pixel value into two distinct classes, land and water. After initial land and water ratios have been established by using photography obtained before and after project construction, subsequent comparisons can be made over time to determine land-water change. Several challenges are associated with the land-water interpretation process. Primarily, land-water classifications are often complicated by the presence of floating aquatic vegetation that occurs throughout the freshwater systems of coastal Louisiana and that is sometimes difficult to differentiate from emergent marsh. Other challenges include tidal fluctuations and water movement from strong winds, which may result in flooding and inundation of emergent marsh during certain conditions. Compensating for these events is difficult but possible by using other sources of imagery to verify marsh conditions for other

  2. Oak Ridge Reservation site management plan for the environmental restoration program

    1995-09-01

    This report describes the overall approach for addressing environmental contamination on the Oak Ridge Reservation (ORR) National Priorities List site located in east Tennessee. The cleanup strategy reflected in this site management plan (SMP) has been developed to accelerate the transition of areas of concern (AOCs) from characterization to remediation by making decisions at the watershed scale based on recommended land uses. Project scoping involves the use of defined remedial action objectives, which are based in part on the land uses selected for the project sites. To provide a consistent land use approach that accommodates the needs of all stakeholders responsible for the remediation and reutilization of the ORR, a reservation-wide strategy has been developed. The Common Ground process is a stakeholder-driven process to determine preferred land use options for the ORR so that clean-up operations will be based on the most likely and acceptable land uses. DOE utilized the information gathered in the Common Ground process to recommend desired land uses for the ORR. The land uses recommended by DOE as a result of the Common Ground process are being used for planning land and facility use/reuse for the next 25 years. Land uses recommended for the ORR in conducting CERCLA remedial activities are conservation, industrial use, and waste management

  3. Restoration Practices Used on Post Mining Sites and Industrial Deposits in the Czech Republic with an Example of Natural Restoration of Granodiorite Quarries and Spoil Heaps

    Chuman Tomáš

    2015-01-01

    Mining of minerals that have significant impact on landscape and landscape functions affects 1% of the land surface worldwide. In the Czech Republic the extent of mining sites is estimated to be more than 800 km2 and according to the state legislation the land affected by mining should be reclaimed. There are several approaches to land restoration, which are shortly reviewed in this article, from pure technical approach to one adopting natural processes. The review shows increasing appeal of ...

  4. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

  5. Model for predicting the restoration of and ammonium migration from in situ mine sites

    Anon.

    1979-01-01

    There are many uranium deposits which are too deep, too poor in quality or too small in extent to be economically strip mined. It now appears that this uranium can be mined using in situ leaching processes. One component of the lixiviant is necessarily a cation and, during the course of mining, the ion exchange sites of the minerals in the mine zone become saturated with this cation. Ammonium is the cation now commonly used. Clearly, any restoration procedure or question involving the rate of cation migration with the groundwater all necessarily involve the process of ion exchange coupled with flow in porous media. The equations describing this process are presented in this paper and numerical solutions obtained. 16 refs

  6. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL's ER and WM programs as managed by DOE's Idaho Field Office (DOE-ID)

  7. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs.

  8. Restoration Practices Used on Post Mining Sites and Industrial Deposits in the Czech Republic with an Example of Natural Restoration of Granodiorite Quarries and Spoil Heaps

    Chuman Tomáš

    2015-11-01

    Full Text Available Mining of minerals that have significant impact on landscape and landscape functions affects 1% of the land surface worldwide. In the Czech Republic the extent of mining sites is estimated to be more than 800 km2 and according to the state legislation the land affected by mining should be reclaimed. There are several approaches to land restoration, which are shortly reviewed in this article, from pure technical approach to one adopting natural processes. The review shows increasing appeal of scientist and conservationist to use natural processes e.g. natural or directed succession as an alternative method of post-mining sites or industrial deposits restoration due to growing evidence of conservational value of such sites in human dominated landscapes. The natural processes used for land restoration are often argued to be slow therefore the rate of spontaneous vegetation succession was assessed in stone quarries and on spoil heaps using a sequence of panchromatic aerial images. The results showed that natural processes act fast and vegetation can reach 100% cover within 10-15 years in granodiorite quarries and on spoil heaps.

  9. In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

    Juhlin, R.; Butherus, M.

    2006-01-01

    The U.S. Department of Energy (DOE) is conducting thermal remediation to remove non-aqueous phase liquids (NAPLs) from the subsurface at the Northeast Site that is part of the Pinellas Environmental Restoration Project. The Northeast Site is located on the Young - Rainey Science, Technology, and Research (STAR) Center in Largo, Florida. The STAR Center was formerly a DOE facility. The NAPL remediation was performed at Area A and is currently being performed at Area B at the Northeast Site. The remediation at Area A was completed in 2003 and covered an area of 900 m 2 (10,000 ft 2 ) and a depth of remediation that extended to 10.7 m (35 ft) below ground surface. Cleanup levels achieved were at or below maximum contaminant levels in almost all locations. The remediation project at Area B is ongoing and covers an area of 3,240 m 2 (36,000 ft 2 ), a volume of 41,300 m (54,000 yd 3), and a depth of remediation to 12 m (40 ft) below ground surface. In addition, a portion of the subsurface under an occupied building in Area B is included in the remediation. The cleanup levels achieved from this remediation will be available in the Area B Final Report that will be posted on the DOE Office of Legacy Management web site (www.lm.doe.gov/land/sites/fl/ pinellas/pinellas.htm) in January 2007. Electrical resistive heating and steam were the chosen remediation methods at both areas. Lessons learned from the Area A remediation were incorporated into the Area B remediation and could benefit managers of similar remediation projects. (authors)

  10. Summary of operations and performance of the Murdock site restoration project in 2007.

    LaFreniere, L. M.; Environmental Science Division

    2008-06-03

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A brief

  11. Site characterization techniques used in environmental restoration activities. Final report of a co-ordinated research project 1995-1999

    2000-05-01

    The objective of this CRP was to promote the exchange of information on the practical experience gained by the Member States in characterization of radioactively contaminated sites. Special emphasis was placed on the development of methods and techniques for the optimization of radiological characterization. In particular, the scope included: definition of a strategy for site characterization; sampling and measurement techniques; data management, including statistical analysis and deterministic radionuclide migration modelling; and post-cleanup radiological surveys and assurance of compliance with release criteria

  12. Site characterization techniques used in environmental restoration activities. Final report of a co-ordinated research project 1995-1999

    NONE

    2000-05-01

    The objective of this CRP was to promote the exchange of information on the practical experience gained by the Member States in characterization of radioactively contaminated sites. Special emphasis was placed on the development of methods and techniques for the optimization of radiological characterization. In particular, the scope included: definition of a strategy for site characterization; sampling and measurement techniques; data management, including statistical analysis and deterministic radionuclide migration modelling; and post-cleanup radiological surveys and assurance of compliance with release criteria.

  13. On-site laboratory support of Oak Ridge National Laboratory environmental restoration field activities

    Burn, J.L.E.

    1995-07-01

    A remedial investigation/feasibility study has been undertaken at Oak Ridge National Laboratory (ORNL). Bechtel National, Inc. and partners CH2M Hill, Ogden Environmental and Energy Services, and PEER Consultants are contracted to Lockheed Martin Energy Systems, performing this work for ORNL's Environmental Restoration (ER) Program. An on-site Close Support Laboratory (CSL) established at the ER Field Operations Facility has evolved into a laboratory where quality analytical screening results can be provided rapidly (e.g., within 24 hours of sampling). CSL capabilities include three basic areas: radiochemistry, chromatography, and wet chemistry. Radiochemical analyses include gamma spectroscopy, tritium and carbon-14 screens using liquid scintillation analysis, and gross alpha and beta counting. Cerenkov counting and crown-ether-based separation are the two rapid methods used for radiostrontium determination in water samples. By extending count times where appropriate, method detection limits can match those achieved by off-site contract laboratories. Volatile organic compounds are detected by means of gas chromatography using either headspace or purge and trap sample introduction (based on EPA 601/602). Ionic content of water samples is determined using ion chromatography and alkalinity measurement. Ion chromatography is used to quantify both anions (based on EPA 300) and cations. Wet chemistry procedures performed at the CSL include alkalinity, pH (water and soil), soil resistivity, and dissolved/suspended solids. Besides environmental samples, the CSL routinely screens health and safety and waste management samples. The cost savings of the CSL are both direct and indirect

  14. Peculiarities and opportunities of restoration of vegetation of experimental ground 'Experimental field' of Semipalatinsk Test Site

    Plisak, R.P.; Plisak, S. V.

    2003-01-01

    Full text: Geo-botanical researches at experimental ground 'Experimental field' of Semipalatinsk Test Site were conducted out in 1994-2000. 26 ground and 87 air nuclear tests were conducted out at the territory in 1949-1962. It is found that for deluvial-proluvial plain: High level of radiation pollution of soils in the epicentre of nuclear explosions is limiting factor for vegetation rehabilitation. Under level of PED of γ-irradiation 14,000-16,000 μR/h vegetation restoration has not begun until now. Only single individuals of Artemisia frigida appear under PED of γ-irradiation 10,000-13,000 μR/h. Rarefied plant aggregations constituted by annual-biennial weed species appear under PED of γ-irradiation 3,600-8,000 μR/h. Natural rehabilitation of vegetation occurs more intensively under PED of γ-irradiation of 60-200 μR/h. Vegetation aggregations close to initial zonal coenosis develop in these conditions. It is found that for tumulose: Vegetation restoration on the tops of hills starts with invasion of weed species. Plant aggregations with predominance of Caragana pumila, tyhedra distachya develop on accumulations of fine earth in cracks of mountain rocks. Lichens and mosses assimilate outcrops of mountain rocks. 2. Plant aggregations with predominance of Spiraea hypericifoia, Caragana pumila, Artemisia frigida develop on the upper parts of slopes of hills. Craters of nuclear explosions have not been assimilated by higher plants yet. Rarefied plant aggregations constituted by Psathyrostachys juncea, Artemisia frigida appear in the lower parts of slopes of hills. Single individuals of Medicago falcata, Galium ruthenicum, Melilotus dentatus are found on sides of explosion craters. Vegetation rehabilitates slowly trenches on gentle slopes of hills. Following measures are necessary for intensification of the process of restoration of vegetation destroyed and damaged by nuclear explosions: To clean slopes of hills from numerous fragment of metallic and plastic

  15. Site characterization techniques used in restoration of agricultural areas on the territory of the Russian Federation contaminated after the accident at the Chernobyl NPP

    Fesenko, S.V.; Alexakhin, R.M.; Sanzharova, N.I.

    2000-01-01

    The experience gained in the aftermath after the heavy radiation accidents shows the need for improvement in site characterisation techniques and methodology in order to provide a link between site characterisation and the selection of restoration strategies. This paper gives an overview of the site characterisation techniques used in restoration of contaminated agricultural lands on the territory of the Russian Federation. The approach used for site characterisation and selection of restoration strategies is described. The main site specific factors influencing the choice of restoration options are identified. Data on the efficiency of major restoration measures used for the remediation of agricultural lands after the Chernobyl Nuclear Power Plant and the Kyshtym accidents are given. A description of the decision support system FORCON, designed to simplify the selection of restoration options, is presented. (author)

  16. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada; TOPICAL

    K. B. Campbell

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the activities necessary to close Corrective Action Unit (CAU) 398: Area 25 Spill Sites. CAU 398, located in Area 25 of the Nevada Test Site, is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996), and consists of the following 13 Corrective Action Sites (CASs) (Figure 1): (1) CAS 25-44-01 , a fuel spill on soil that covers a concrete pad. The origins and use of the spill material are unknown, but the spill is suspected to be railroad bedding material. (2) CAS 25-44-02, a spill of liquid to the soil from leaking drums. (3) CAS 25-44-03, a spill of oil from two leaking drums onto a concrete pad and surrounding soil. (4) CAS 25-44-04, a spill from two tanks containing sulfuric acid and sodium hydroxide used for a water demineralization process. (5) CAS 25-25-02, a fuel or oil spill from leaking drums that were removed in 1992. (6) CAS 25-25-03, an oil spill adjacent to a tipped-over drum. The source of the drum is not listed, although it is noted that the drum was removed in 1991. (7) CAS 25-25-04, an area on the north side of the Engine-Maintenance, Assembly, and Disassembly (E-MAD) facility, where oils and cooling fluids from metal machining operations were poured directly onto the ground. (8) CAS 25-25-05, an area of oil and/or hydraulic fluid spills beneath the heavy equipment once stored there. (9) CAS 25-25-06, an area of diesel fuel staining beneath two generators that have since been removed. (10) CAS 25-25-07, an area of hydraulic oil spills associated with a tunnel-boring machine abandoned inside X-Tunnel. (11) CAS 25-25-08, an area of hydraulic fluid spills associated with a tunnel-boring machine abandoned inside Y-Tunnel. (12) CAS 25-25-16, a diesel fuel spill from an above-ground storage tank located near Building 3320 at Engine Test Stand-1 (ETS-1) that was removed in 1998. (13) CAS 25-25-17, a hydraulic oil spill

  17. Site restoration: Estimation of attributable costs from plutonium-dispersal accidents

    Chanin, D.I.; Murfin, W.B.

    1996-05-01

    A nuclear weapons accident is an extremely unlikely event due to the extensive care taken in operations. However, under some hypothetical accident conditions, plutonium might be dispersed to the environment. This would result in costs being incurred by the government to remediate the site and compensate for losses. This study is a multi-disciplinary evaluation of the potential scope of the post-accident response that includes technical factors, current and proposed legal requirements and constraints, as well as social/political factors that could influence decision making. The study provides parameters that can be used to assess economic costs for accidents postulated to occur in urban areas, Midwest farmland, Western rangeland, and forest. Per-area remediation costs have been estimated, using industry-standard methods, for both expedited and extended remediation. Expedited remediation costs have been evaluated for highways, airports, and urban areas. Extended remediation costs have been evaluated for all land uses except highways and airports. The inclusion of cost estimates in risk assessments, together with the conventional estimation of doses and health effects, allows a fuller understanding of the post-accident environment. The insights obtained can be used to minimize economic risks by evaluation of operational and design alternatives, and through development of improved capabilities for accident response

  18. Site restoration: Estimation of attributable costs from plutonium-dispersal accidents

    Chanin, D.I.; Murfin, W.B. [Technadyne Engineering Consultants, Inc., Albuquerque, NM (United States)

    1996-05-01

    A nuclear weapons accident is an extremely unlikely event due to the extensive care taken in operations. However, under some hypothetical accident conditions, plutonium might be dispersed to the environment. This would result in costs being incurred by the government to remediate the site and compensate for losses. This study is a multi-disciplinary evaluation of the potential scope of the post-accident response that includes technical factors, current and proposed legal requirements and constraints, as well as social/political factors that could influence decision making. The study provides parameters that can be used to assess economic costs for accidents postulated to occur in urban areas, Midwest farmland, Western rangeland, and forest. Per-area remediation costs have been estimated, using industry-standard methods, for both expedited and extended remediation. Expedited remediation costs have been evaluated for highways, airports, and urban areas. Extended remediation costs have been evaluated for all land uses except highways and airports. The inclusion of cost estimates in risk assessments, together with the conventional estimation of doses and health effects, allows a fuller understanding of the post-accident environment. The insights obtained can be used to minimize economic risks by evaluation of operational and design alternatives, and through development of improved capabilities for accident response.

  19. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  20. Potential ?Ecological Traps? of Restored Landscapes: Koalas Phascolarctos cinereus Re-Occupy a Rehabilitated Mine Site

    Cristescu, Romane H.; Banks, Peter B.; Carrick, Frank N.; Fr?re, C?line

    2013-01-01

    With progressively increasing anthropogenic habitat disturbances, restoration of impacted landscapes is becoming a critical element of biodiversity conservation. Evaluation of success in restoration ecology rarely includes faunal components, usually only encompassing abiotic and floral components of the ecosystems. Even when fauna is explicitly included, it is usually only species presence/absence criteria that are considered. If restoration is to have a positive outcome, however, populations...

  1. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 121: Storage Tanks and Miscellaneous Sites, Nevada Test Site, Nevada

    NSTec Environmental Restoration

    2007-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 121, Storage Tanks and Miscellaneous Sites. CAU 121 is currently listed in Appendix III of the ''Federal Facility Agreement and Consent Order'' (FFACO, 1996) and consists of three Corrective Action Sites (CASs) located in Area 12 of the Nevada Test Site (NTS): CAS 12-01-01, Aboveground Storage Tank; CAS 12-01-02, Aboveground Storage Tank; and CAS 12-22-26, Drums; 2 AST's. CASs 12-01-01 and 12-01-02 are located to the west of the Area 12 Camp, and CAS 12-22-26 is located near the U-12g Tunnel, also known as G-tunnel, in Area 12 (Figure 1). The aboveground storage tanks (ASTs) present at CASs 12-01-01 and 12-01-02 will be removed and disposed of at an appropriate facility. Soil below the ASTs will be sampled to identify whether it has been impacted with chemicals or radioactivity above action levels. If impacted soil above action levels is present, the soil will be excavated and disposed of at an appropriate facility. The CAS 12-22-26 site is composed of two overlapping areas, one where drums had formerly been stored, and the other where an AST was used to dispense diesel for locomotives used at G-tunnel. This area is located above an underground radioactive materials area (URMA), and within an area that may have elevated background radioactivity because of containment breaches during nuclear tests and associated tunnel reentry operations. CAS 12-22-26 does not include the URMA or the elevated background radioactivity. An AST that had previously been used to store liquid magnesium chloride (MgCl) was properly disposed of several years ago, and releases from this tank are not an environmental concern. The diesel AST will be removed and disposed of at an appropriate facility. Soil at the former drum area and the diesel AST area will be sampled to identify whether it has been impacted by releases, from the drums or the

  2. Field Evaluation of the Restorative Capacity of the Aquifer Downgradient of a Uranium In-Situ Recovery Mining Site

    Reimus, Paul William [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-05-22

    A two-part field study was conducted in Smith Ranch-Highland in-situ recovery (ISR) near Douglas, Wyoming, to evaluate the restorative capacity of the aquifer downgradient (i.e., hydrologically downstream) of a Uranium ISR mining site with respect to the transport of uranium and other potential contaminants in groundwater after mining has ceased. The study was partially conducted by checking the Uranium content and the alkalinity of separate wells, some wells had been restored and others had not. A map and in-depth procedures of the study are included.

  3. Off-site training of laparoscopic skills, a scoping review using a thematic analysis

    Thinggaard, Ebbe; Kleif, Jakob; Bjerrum, Flemming

    2016-01-01

    in MEDLINE, EMBASE, ERIC, Scopus, and PsychINFO, following a scoping review methodology. The included literature was analyzed iteratively using a thematic analysis approach. The study was reported in accordance with the STructured apprOach to the Reporting In healthcare education of Evidence Synthesis...

  4. Site occupancy of brown-headed nuthatches varies with habitat restoration and range-limit context

    Richard A. Stanton; Frank R. Thompson; Dylan C. Kesler

    2015-01-01

    Knowledge about species’ responses to habitat restoration can inform subsequent management and reintroduction planning. We used repeated call-response surveys to study brown-headed nuthatch (Sitta pusilla) patch occupancy at the current limits of its apparently expanding range in an area with active habitat restoration. We fit a probit occupancy...

  5. Design criteria applicable to the environmental restoration of sites affected by uranium mining activities in the past

    Carboneras, P.; Sanchez, M.

    1993-01-01

    In this paper the authors discuss the basic aspects to be considered while evaluating different alternatives to perform environmental restoration of sites affected by naturally occurring radionuclides, enhanced by human actions, as is the case in some old uranium mining activities. The discussion is confined to sites where radiation hazards had existed forever (sites with uranium deposits) and where the mining activities have introduced several factors modifying the initial situation, leading to the now existing one, requiring intervention as decided by the relevant authorities, in accordance with recommendations of ICRP60

  6. Design criteria applicable to the environmental restoration of sites affected by uranium mining activities in the past

    Carboneras, P. [ENRESA, Madrid (Spain); Sanchez, M. [INITEC, Madrid (Spain)

    1993-12-31

    In this paper the authors discuss the basic aspects to be considered while evaluating different alternatives to perform environmental restoration of sites affected by naturally occurring radionuclides, enhanced by human actions, as is the case in some old uranium mining activities. The discussion is confined to sites where radiation hazards had existed forever (sites with uranium deposits) and where the mining activities have introduced several factors modifying the initial situation, leading to the now existing one, requiring intervention as decided by the relevant authorities, in accordance with recommendations of ICRP60.

  7. Potential ‘Ecological Traps’ of Restored Landscapes: Koalas Phascolarctos cinereus Re-Occupy a Rehabilitated Mine Site

    Cristescu, Romane H.; Banks, Peter B.; Carrick, Frank N.; Frère, Céline

    2013-01-01

    With progressively increasing anthropogenic habitat disturbances, restoration of impacted landscapes is becoming a critical element of biodiversity conservation. Evaluation of success in restoration ecology rarely includes faunal components, usually only encompassing abiotic and floral components of the ecosystems. Even when fauna is explicitly included, it is usually only species presence/absence criteria that are considered. If restoration is to have a positive outcome, however, populations in restored habitats should exhibit comparable survival and reproductive rates to populations found in undisturbed surroundings. If a species recolonises restored areas but later experiences decreased fitness, restored areas could become ecological sinks or traps. We investigated this possibility in a case study of koalas Phascolarctos cinereus occupying rehabilitated mining areas on North Stradbroke Island, Australia. Our holistic approach compared rehabilitated and undisturbed areas on the basis of their vegetation characteristics, of koalas' body condition, roosting trees, diet, as well as predator index. Koalas using rehabilitated areas appeared to be able to access an adequate supply of roosting and fodder trees, were in good condition and had high reproductive output. We did not find any significant differences in predator density between rehabilitated areas and undisturbed surroundings. The results presented in this study showed there was no evidence that the post-mining rehabilitated areas constitute ecological sinks or traps. However, to reach a definitive conclusion as to whether areas rehabilitated post-mining provide at least equivalent habitat to undisturbed locations, additional research could be undertaken to assess foliar nutrient/water/toxin differences and predation risk in rehabilitated areas compared with undisturbed areas. More generally, the evaluation of whether restoration successfully produces a functional ecological community should include criteria

  8. Assessment of mycorrhizal colonisation and soil nutrients in unmanaged fire-impacted soils from two target restoration sites

    Dias, J. M.; Oliveira, R. S.; Franco, A. R.; Ritz, K.; Nunan, N.; Castro, P. M. L.

    2010-07-01

    The mycorrhizal colonisation of plants grown in unmanaged soils from two restoration sites with a fire history in Northern Portugal was evaluated from the perspective of supporting restoration programmes. To promote restoration of original tree stands, Quercus ilex L. and Pinus pinaster Ait. were used as target species on two sites, denoted Site 1 and 2 respectively. The aim of the study was to assess whether mycorrhizal propagules that survived fire episodes could serve as in situ inoculum sources, and to analyse the spatial distribution of soil nutrients and mycorrhizal parameters. In a laboratory bioassay, P. pinaster and Q. ilex seedlings were grown on soils from the target sites and root colonisation by ectomycorrhizal (ECM) and arbuscular mycorrhizal (AM) fungi was determined. The ECM root colonisation levels found indicated that soil from Site 2 contained sufficient ECM propagules to serve as a primary source of inoculum for P. pinaster. The low levels of ECM and AM colonisation obtained on the roots of plants grown in soil from Site 1 indicated that the existing mycorrhizal propagules might be insufficient for effective root colonisation of Q. ilex. Different ECM morphotypes were found in plants grown in soil from the two sites. At Site 2 mycorrhizal parameters were found to be spatially structured, with significant differences in ECM colonisation and soil P concentrations between regions of either side of an existing watercourse. The spatial distribution of mycorrhizal propagules was related to edaphic parameters (total C and extractable P), and correlations between soil nutrients and mycorrhizal parameters were found. (Author) 31 refs.

  9. Scoping evaluation of the technical capabilities of DOE sites for disposal of hazardous metals in mixed low-level waste

    Gruebel, M.M.; Waters, R.D.; Langkopf, B.S.

    1997-05-01

    A team of analysts designed and conducted a scoping evaluation to estimate the technical capabilities of fifteen Department of Energy sites for disposal of the hazardous metals in mixed low-level waste (i.e., waste that contains both low-level radioactive materials and hazardous constituents). Eight hazardous metals were evaluated: arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver. The analysis considered transport only through the groundwater pathway. The results are reported as site-specific estimates of maximum concentrations of each hazardous metal in treated mixed low-level waste that do not exceed the performance measures established for the analysis. Also reported are site-specific estimates of travel times of each hazardous metal to the point of compliance

  10. Studies on decommissioning of TRIGA reactors and site restoration technologies in the Republic of Korea

    Oh, Won-Zin; Kim, Gye-Nam; Won, Hui-Jun

    2002-01-01

    Research and development on research reactor decommissioning and environmental restoration has been carried out at KAERI since 1997 to prepare for the decommissioning of KAERI's two TRIGA-type research reactors, which had been shut down since 1995. A 3-D graphic model of the TRIGA research reactor was built using IGRIP. The dismantling process was simulated in the graphic environment to verify the feasibility of individual operations before the execution of the remote dismantling process. An under-water wall-climbing robot, moving by propeller injection, and identifying its coordinates by using a laser sensor, was developed and tested in the TRIGA reactor pool by measuring a radioactive contamination map of the reactor surface. Using MODFLOW and TRIGA site geological data, a computer simulation of the underground migration of residual radionuclides, after the TRIGA reactor decommissioning, was carried out. It was found that the underground migration rate was very slow such that, when radionuclide decay and dilution are considered, the residual radionuclides will not have a significant environmental impact. The soil decontamination R and D, using soil washing, solvent flushing and electro-decontamination technologies, was carried out to determine the best method for decontaminating the soil waste accumulated in KAERI. The decontamination results indicated that, using the soil washing method, more than 80% of the soil wastes could be decontaminated well enough to discharge them to the environment. It was also determined that the control of solution pH and temperature in the soil washing process is important for the reduction of decontamination waste. Further decontamination, using an electro-kinetic decontamination method, was considered necessary for the residual soil waste, which consisted mainly of fine soil particles. (author)

  11. Status of environmental response efforts at radioactively contaminated sites in the united states air force installation restoration program

    Rowe, W.D. Jr.; McEntee, T.E. Jr.; Johnson, B.; Manning, L.

    1995-01-01

    The United States Air Force has identified approximately 170 radioactively contaminated sites at its domestic installations. These sites contain a variety of low level radioactive and mixed wastes and are classified as burial sites, landfills, buildings, and other disposal sites. Of these 170, approximately 70 are presently being evaluated under the Air Force Installation Restoration Program (IRP) in accordance with applicable laws and regulations. Removal and/or remedial actions have been taken at specific sites using site-specific residual radioactivity criteria. The remaining sites are either under investigation to determine the need for possible action or have been classified as response complete based on restricted or unrestricted future use. This paper describes past Air Force operations that generated radioactive waste materials; examines the current inventory of resulting radioactively contaminated sites in the Air Force IRP; reviews criteria used to evaluate sites for removal and/or remedial actions; provides summary information on actions taken at sites; and focuses on response actions and cleanup levels at two completed sites. The paper concludes with an assessment of outstanding issues relevant to the remediation of radioactively contaminated sites. (author)

  12. Additional disturbances as a beneficial tool for restoration of post-mining sites: a multi-taxa approach.

    Řehounková, Klára; Čížek, Lukáš; Řehounek, Jiří; Šebelíková, Lenka; Tropek, Robert; Lencová, Kamila; Bogusch, Petr; Marhoul, Pavel; Máca, Jan

    2016-07-01

    Open interior sands represent a highly threatened habitat in Europe. In recent times, their associated organisms have often found secondary refuges outside their natural habitats, mainly in sand pits. We investigated the effects of different restoration approaches, i.e. spontaneous succession without additional disturbances, spontaneous succession with additional disturbances caused by recreational activities, and forestry reclamation, on the diversity and conservation values of spiders, beetles, flies, bees and wasps, orthopterans and vascular plants in a large sand pit in the Czech Republic, Central Europe. Out of 406 species recorded in total, 112 were classified as open sand specialists and 71 as threatened. The sites restored through spontaneous succession with additional disturbances hosted the largest proportion of open sand specialists and threatened species. The forestry reclamations, in contrast, hosted few such species. The sites with spontaneous succession without disturbances represent a transition between these two approaches. While restoration through spontaneous succession favours biodiversity in contrast to forestry reclamation, additional disturbances are necessary to maintain early successional habitats essential for threatened species and open sand specialists. Therefore, recreational activities seem to be an economically efficient restoration tool that will also benefit biodiversity in sand pits.

  13. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    NONE

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs.

  14. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs

  15. Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

    Survochak, Scott [USDOE Office of Legacy Management, Washington, DC (United States); Daniel, Joe [Navarrao Research and Engineering, Inc., Oak Ridge, TN (United States)

    2017-01-01

    This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quarter of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)—trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.

  16. Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

    Survochak, Scott; Daniel, Joe

    2017-01-01

    This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quarter of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)-trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.

  17. Scope of work-supplemental standards-related fieldwork - Salt Lake City UMTRA Project Site, Salt Lake City, Utah

    1996-01-01

    This scope of work governs the field effort to conduct transient in situ (hereafter referred to by the trademark name HydroPunch reg-sign) investigative subsurface logging and ground water sampling, and perform well point installation services at the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Salt Lake City, Utah. The HydroPunch reg-sign and well point services subcontractor (the Subcontractor) shall provide services as stated herein to be used to investigate the subsurface, collect and analyze ground water samples, and install shallow well points

  18. Eco-restoration of a high-sulphur coal mine overburden dumping site in northeast India: A case study

    Dowarah, J.; Deka Boruah, H. P.; Gogoi, J.; Pathak, N.; Saikia, N.; Handique, A. K.

    2009-10-01

    Eco-restoration of mine overburden (OB) or abandoned mine sites is a major environmental concern. In the present investigation, an integrated approach was used to rejuvenate a high-sulphur mine OB dumping site in the Tirap Collieries, Assam, India, which is situated in the Indo-Burma mega-biodiversity hotspot. A mine OB is devoid of true soil character with poor macro and micronutrient content and contains elevated concentrations of trace and heavy metals. Planting of herbs, shrubs, cover crops and tree species at close proximity leads to primary and secondary sere state succession within a period of 3 to 5 years. A variety of plant species were screened for potential use in restoration: herbs, including Sccharum spontaneum, Cymbopogon winterianus Jowitt (citronella), and Cymbopogon flexuosus (lemon grass) cover plants, including Mimosa strigillosa, M. striata, and M. pigra; shrubs, including Sesbania rostrata (dhaincha) and Cassia streata (cassia); and tree species, including Gmelina arborea (gomari) and Dalbergia sissoo (sissoo). Amendment with unmined soil and bio-organic matter was required for primary establishment of some plant species. Management of these plant species at the site will ensure long term sustainable eco-restoration of the coal mine-degraded land.

  19. Eco-restoration of a high-sulphur coal mine overburden dumping site in northeast India: A case study

    Dowarah, J.; Boruah, H.P.D.; Gogoi, J.; Pathak, N.; Saikia, N.; Handique, A.K. [CSIR, Jorhat (India). North East Institute of Science & Technology

    2009-10-15

    Eco-restoration of mine overburden (OB) or abandoned mine sites is a major environmental concern. In the present investigation, an integrated approach was used to rejuvenate a high-sulphur mine OB dumping site in the Tirap Collieries, Assam, India, which is situated in the Indo-Burma mega-biodiversity hotspot. A mine OB is devoid of true soil character with poor macro and micronutrient content and contains elevated concentrations of trace and heavy metals. Planting of herbs, shrubs, cover crops and tree species at close proximity leads to primary and secondary sere state succession within a period of 3 to 5 years. A variety of plant species were screened for potential use in restoration: herbs, including Sccharum spontaneum, Cymbopogon winterianus Jowitt (citronella), and Cymbopogon flexuosus (lemon grass) cover plants, including Mimosa strigillosa, M. striata, and M. pigra; shrubs, including Sesbania rostrata (dhaincha) and Cassia streata (cassia); and tree species, including Gmelina arborea (gomari) and Dalbergia sissoo (sissoo). Amendment with unmined soil and bio-organic matter was required for primary establishment of some plant species. Management of these plant species at the site will ensure long term sustainable eco-restoration of the coal mine-degraded land.

  20. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  1. Using Florida Keys Reference Sites As a Standard for Restoration of Forest Structure in Everglades Tree Islands

    Ross, M.S.; Sah, J.P.; Ruiz, P.L.; Ross, M.S.; Ogurcak, D.E.

    2010-01-01

    In south Florida, tropical hardwood forests (hammocks) occur in Everglades tree islands and as more extensive forests in coastal settings in the nearby Florida Keys. Keys hammocks have been less disturbed by humans, and many qualify as old-growth, while Everglades hammocks have received much heavier use. With improvement of tree island condition an important element in Everglades restoration efforts, we examined stand structure in 23 Keys hammocks and 69 Everglades tree islands. Based on Stand Density Index and tree diameter distributions, many Everglades hammocks were characterized by low stocking and under-representation in the smaller size classes. In contrast, most Keys forests had the dense canopies and open under stories usually associated with old-growth hardwood hammocks. Subject to the same caveats that apply to off-site references elsewhere, structural information from mature Keys hammocks can be helpful in planning and implementing forest restoration in Everglades tree islands. In many of these islands, such restoration might involve supplementing tree stocking by planting native trees to produce more complete site utilization and a more open under story.

  2. Vegetation Succession on Degraded Sites in the Pomacochas Basin (Amazonas, N Peru—Ecological Options for Forest Restoration

    Helge Walentowski

    2018-02-01

    Full Text Available The Andes of northern Peru are still widely covered with forests, but increasingly suffer from habitat fragmentation. Subsequent soil degradation often leads to the abandonment of overused forests and pastures. Ecological knowledge on the restoration potential, e.g., on dependencies of soil conditions and altitude, is scarce. Therefore, we compared soil and vegetation patterns along nine transects within the upper Pomacochas Basin, which is an important biodiversity corridor along the Andes, between remaining forests, succession sites and pastures. Anthropogenic successional and disturbance levels, geological substrate, and altitude have the most important ecological impacts on vegetation and tree species composition. Species responded to sandstone versus calcareous substrates, but also to depths of the organic soil layer, and light conditions. The absence of organic layers under pastures contrasted with the accumulation of thick organic layers under forest cover. Vegetation composition at succession sites revealed certain starting points (herbal stage, bush stage, or secondary forest for restoration that will determine the length of regeneration paths. Pre-forest patches of Alchornea sp. and Parathesis sp. may act as habitat stepping stones for expeditiously restoring biocorridors for wildlife. The key findings can contribute to the sustainable use and conservation of biodiversity in a fragile ecoregion.

  3. EarthScope Transportable Array Siting Outreach Activities in Alaska and Western Canada

    Dorr, P. M.; Gardine, L.; Tape, C.; McQuillan, P.; Cubley, J. F.; Samolczyk, M. A.; Taber, J.; West, M. E.; Busby, R.

    2015-12-01

    The EarthScope Transportable Array is deploying about 260 stations in Alaska and western Canada. IRIS and EarthScope are partnering with the Alaska Earthquake Center, part of the University of Alaska's Geophysical Institute, and Yukon College to spread awareness of earthquakes in Alaska and western Canada and the benefits of the Transportable Array for people living in these regions. We provide an update of ongoing education and outreach activities in Alaska and Canada as well as continued efforts to publicize the Transportable Array in the Lower 48. Nearly all parts of Alaska and portions of western Canada are tectonically active. The tectonic and seismic variability of Alaska, in particular, requires focused attention at the regional level, and the remoteness and inaccessibility of most Alaskan and western Canadian villages and towns often makes frequent visits difficult. When a community is accessible, every opportunity to engage the residents is made. Booths at state fairs and large cultural gatherings, such as the annual convention of the Alaska Federation of Natives, are excellent venues to distribute earthquake information and to demonstrate a wide variety of educational products and web-based applications related to seismology and the Transportable Array that residents can use in their own communities. Meetings and interviews with Alaska Native Elders and tribal councils discussing past earthquakes has led to a better understanding of how Alaskans view and understand earthquakes. Region-specific publications have been developed to tie in a sense of place for residents of Alaska and the Yukon. The Alaska content for IRIS's Active Earth Monitor emphasizes the widespread tectonic and seismic features and offers not just Alaska residents, but anyone interested in Alaska, a glimpse into what is going on beneath their feet. The concerted efforts of the outreach team will have lasting effects on Alaskan and Canadian understanding of the seismic hazard and

  4. Restoration of areas disturbed by site studies for a mined commercial radioactive waste repository: The Basalt Waste Isolation Project [BWIP

    Brandt, C.A.; Rickard, W.H. Jr.; Biehert, R.W.; Newell, R.L.; Page, T.L.

    1989-01-01

    The Basalt Waste Isolation Project (BWIP) was undertaken to environmentally characterize a portion of the US Department of Energy's Hanford Site in Washington State as a potential host for the nation's first mined commercial nuclear waste repository. Studies were terminated by Congress in 1987. Between 1976 and 1987, 72 areas located across the Hanford Site were disturbed by the BWIP. These areas include borehole pads, a large Exploratory Shaft Facility, and the Near Surface Test Facility. Most boreholes were cleared of vegetation, leveled, and stabilized with a thick layer of compacted pit-run gravel and sand. The Near Surface Test Facility consists of three mined adits, a rock-spoils bench, and numerous support facilities. Restoration began in 1988 with the objective of returning sites to pre-existing conditions using native species. The Hanford Site retains some of the last remnants of the shrub-steppe ecosystem in Washington. The primary constraints to restoring native vegetation at Hanford are low precipitation and the presence of cheatgrass, an extremely capable alien competitor. 5 figs

  5. Technology development and demonstration for TRIGA research reactor decontamination, decommissioning and site restoration

    Oh, Won Zin; Jung, Ki Jung; Lee, Byung Jik

    1997-01-01

    This paper describes the introduction to research reactor decommissioning plan at KAERI, the background of technology development and demonstration, and the current status of the system decontamination technology for TRIGA reactors, concrete decontamination and dust treatment technologies, wall ranging robot and graphic simulation of dismantling processes, soil decontamination and restoration technology, recycling or reuse technologies for radioactive metallic wastes, and incineration technology demonstration for combustible wastes. 9 figs

  6. Quantifying geomorphic change at ephemeral stream restoration sites using a coupled-model approach

    Norman, Laura M.; Sankey, Joel B.; Dean, David; Caster, Joshua J.; DeLong, Stephen B.; Henderson-DeLong, Whitney; Pelletier, Jon D.

    2017-01-01

    Rock-detention structures are used as restoration treatments to engineer ephemeral stream channels of southeast Arizona, USA, to reduce streamflow velocity, limit erosion, retain sediment, and promote surface-water infiltration. Structures are intended to aggrade incised stream channels, yet little quantified evidence of efficacy is available. The goal of this 3-year study was to characterize the geomorphic impacts of rock-detention structures used as a restoration strategy and develop a methodology to predict the associated changes. We studied reaches of two ephemeral streams with different watershed management histories: one where thousands of loose-rock check dams were installed 30 years prior to our study, and one with structures constructed at the beginning of our study. The methods used included runoff, sediment transport, and geomorphic modelling and repeat terrestrial laser scanner (TLS) surveys to map landscape change. Where discharge data were not available, event-based runoff was estimated using KINEROS2, a one-dimensional kinematic-wave runoff and erosion model. Discharge measurements and estimates were used as input to a two-dimensional unsteady flow-and-sedimentation model (Nays2DH) that combined a gridded flow, transport, and bed and bank simulation with geomorphic change. Through comparison of consecutive DEMs, the potential to substitute uncalibrated models to analyze stream restoration is introduced. We demonstrate a new approach to assess hydraulics and associated patterns of aggradation and degradation resulting from the construction of check-dams and other transverse structures. Notably, we find that stream restoration using rock-detention structures is effective across vastly different timescales.

  7. National Public Information Symposium on Peaceful Uses of Nuclear Energy, NUC Info' 2000. Radioactive Waste Management and Site Restoration in Uranium Industry. Proceedings. Volume 2

    Dobos, Ion; Comsa, Olivia

    2000-01-01

    These proceedings published in two volumes contain materials presented at the National Public Information Symposium on Peaceful Uses of Nuclear Energy, NUC Info' 2000. Radioactive Waste Management and Site Restoration in Uranium Industry - held on 5th September to 8th September 2000 at Baita - Bihor, Romania. The proceedings are structured in 4 sections: 1. Management of radioactive wastes arising from uranium mining, milling and decommissioning; 2. Uranium mine closing down; 3. Environmental restoration of uranium mining and milling sites; 4. Management of radioactive wastes arising from nuclear applications. The contributions in this volume debate the issues of environment restoration at uranium ore mining and management of radioactive wastes resulted from nuclear applications

  8. Proposed Plan for an amendment to the Environmental Restoration Disposal Facility Record of Decision, Hanford Site, Richland, Washington

    1997-07-01

    The U.S. Environmental Protection Agency, the Washington State Department of Ecology, and the U.S. Department of Energy (Tri- Parties) are proposing an amendment to the Environmental Restoration Disposal Facility Record of Decision (ERDF ROD). EPA is the lead regulatory agency for the ERDF Project. This Proposed Plan includes two elements intended to promote Hanford Site cleanup activities by broadening utilization and operation of ERDF as follows: (1) Construct the planned Phase II of ERDF using the current disposal cell design and (2) enable centralized treatment of remediation waste at ERDF prior to disposal, as appropriate

  9. Political Participation and Power Relations in Egypt: The Scope of Newspapers and Social Network Sites

    Mostafa Shehata

    2017-05-01

    Full Text Available The political use of media in Egypt post-2011 revolution brought about drastic transformations in political activism and power structures. In the context of communication power theory, this article investigates the effects of newspapers and social network sites on political participation and political power relations. The research employed a mixed methodology, comprised of a survey of 527 Egyptian youth and semi-structured interviews of 12 political activists and journalists. The results showed a significant relationship between reading newspapers and youth’s political participation, but not between using social network sites and political participation. In addition, newspapers and social network sites were platforms for a series of conflicts and coalitions that emerged between pro- and anti-revolution actors. Despite the importance of social network sites as key tools for informing and mobilizing the public, they eventually failed to empower new political actors, and this was because old actors, supported by newspapers and other mainstream media, managed to obstruct the new actors’ progress.

  10. Technical Scope and Approach for the 2004 Composite Analysis of Low Level Waste Disposal at the Hanford Site

    Kincaid, Charles T.; Bryce, Robert W.; Buck, John W.

    2004-01-01

    A composite analysis is required by U.S. Department of Energy (DOE) Manual 435.1-1 to ensure public safety through the management of active and planned low-level radioactive waste disposal facilities associated with the Hanford Site (DOE/HQ-Manual 435.1-1). A Composite Analysis is defined as ''a reasonably conservative assessment of the cumulative impact from active and planned low-level waste disposal facilities, and all other sources from radioactive contamination that could interact with the low-level waste disposal facility to affect the dose to future members of the public''. At the Hanford Site, a composite analysis is required for continued disposal authorization for the immobilized low-activity waste, tank waste vitrification plant melters, low level waste in the 200 East and 200 West Solid Waste Burial Grounds, and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) waste in the Environmental Restoration Disposal Facility. The 2004 Composite Analysis will be a site-wide analysis, considering final remedial actions for the Columbia River corridor and the Central Plateau at the Hanford Site. The river corridor includes waste sites and facilities in each of the 100 Areas as well as the 300, 400, and 600 Areas. The remedial actions for the river corridor are being conducted to meet residential land use standards with the vision of the river corridor being devoted to a combination of recreation and preservation. The ''Central Plateau'' describes the region associated with operations and waste sites of the 200 Areas. DOE is developing a strategy for closure of the Central Plateau area by 2035. At the time of closure, waste management activities will shrink to a Core Zone within the Central Plateau. The Core Zone will contain the majority of Hanford's permanently disposed waste

  11. Oxidative destruction of ammonia for restoration of uranium solution mining sites

    Humenick, M.J.; Garwacka, K.

    1984-01-01

    A laboratory experimental research project was conducted to evaluate the use of chlorine for the oxidative destruction of residual ammonia that may remain in ground water after in-situ uranium solution mining operations. The work tested the idea of injecting high strength calcium hypochlorite solution into the mining zone to convert ammonia to nitrogen gas as a final cleanup process for ammonia removal from the ground water system. This paper details ammonia removal efficiency as a function of chlorine dose, reactant, and product material balances, and how the concept may be used as a final ground water restoration process

  12. Oxidative destruction of ammonia for restoration of uranium solution mining sites

    Humenick, M.J.; Garwacka, K.

    1984-02-01

    A laboratory experimental research project was conducted to evaluate the use of chlorine for the oxidative destruction of residual ammonia that may remain in ground water after in-situ uranium solution mining operations. The work tested the idea of injecting high strength calcium hypochlorite solution into the mining zone to convert ammonia to nitrogen gas as a final cleanup process for ammonia removal from the ground water system. This paper details ammonia removal efficiency as a function of chlorine dose, reactant, and product material balances, and how the concept may be used as a final ground water restoration process.

  13. Oxidative destruction of ammonia for restoration of uranium solution mining sites

    Humenick, M.J.; Garwacka, K.

    1984-01-01

    A laboratory experimental research project was conducted to evaluate the use of chlorine for the oxidative destruction of residual ammonia that may remain in ground water after in-situ uranium solution mining operations. The work tested the idea of injecting high strength calcium hypochlorite solution into the mining zone to convert ammonia to nitrogen gas as a final cleanup process for ammonia removal from the ground water system. This paper details ammonia removal efficiency as a function of chlorine dose, reactant, and product material balances, and how the concept may be used as a final ground water restoration process.

  14. Rapid assessment of ecosystem services provided by two mineral extraction sites restored for nature conservation in an agricultural landscape in eastern England.

    Blaen, Phillip J; Jia, Li; Peh, Kelvin S-H; Field, Rob H; Balmford, Andrew; MacDonald, Michael A; Bradbury, Richard B

    2015-01-01

    Despite growing recognition that mineral sites restored for nature conservation can enhance local biodiversity, the wider societal benefits provided by this type of restoration relative to alternative options are not well understood. This study addresses this research gap by quantifying differences in ecosystem services provision under two common mineral site after-uses: nature conservation and agriculture. Using a combination of site-specific primary field data, benefits transfer and modelling, we show that for our sites restoration for nature conservation provides a more diverse array of ecosystem services than would be delivered under an agricultural restoration scenario. We also explore the effects of addressing different conservation targets, which we find alter the provision of ecosystem services on a service-specific basis. Highly species-focused intervention areas are associated with increased carbon storage and livestock grazing provision, whereas non-intervention areas are important for carbon sequestration, fishing, recreation and flood risk mitigation. The results of this study highlight the wider societal importance of restored mineral sites and may help conservation managers and planners to develop future restoration strategies that provide benefits for both biodiversity and human well-being.

  15. Seasonal and spatial patterns of metals at a restored copper mine site. I. Stream copper and zinc

    Bambic, Dustin G.; Alpers, Charles N.; Green, Peter G.; Fanelli, Eileen; Silk, Wendy K.

    2006-01-01

    Seasonal and spatial variations in metal concentrations and pH were found in a stream at a restored copper mine site located near a massive sulfide deposit in the Foothill copper-zinc belt of the Sierra Nevada, California. At the mouth of the stream, copper concentrations increased and pH decreased with increased streamflow after the onset of winter rain and, unexpectedly, reached extreme values 1 or 2 months after peaks in the seasonal hydrographs. In contrast, aqueous zinc and sulfate concentrations were highest during low-flow periods. Spatial variation was assessed in 400 m of reach encompassing an acidic, metal-laden seep. At this seep, pH remained low (2-3) throughout the year, and copper concentrations were highest. In contrast, the zinc concentrations increased with downstream distance. These spatial patterns were caused by immobilization of copper by hydrous ferric oxides in benthic sediments, coupled with increasing downstream supply of zinc from groundwater seepage. - Seasonal hydrology and benthic sediments control copper and zinc concentrations in a stream through a restored mine site

  16. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 575: Area 15 Miscellaneous Sites, Nevada National Security Site, Nevada

    Matthews, Patrick [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2014-12-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 575, Area 15 Miscellaneous Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 575 comprises the following four corrective action sites (CASs) located in Area 15 of the Nevada National Security Site: 15-19-02, Waste Burial Pit, 15-30-01, Surface Features at Borehole Sites, 15-64-01, Decontamination Area, 15-99-03, Aggregate Plant This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 575 using the SAFER process. Additional information will be obtained by conducting a field investigation to document and verify the adequacy of existing information, to affirm the predicted corrective action decisions, and to provide sufficient data to implement the corrective actions. This will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  17. Scoping calculations for groundwater transport of tritium from the Gnome Site, New Mexico

    Pohlmann, K.; Andricevic, R.

    1994-08-01

    Analytic solutions are employed to investigate potential groundwater transport of tritium from a radioactive tracer site near the Project Gnome site in southeastern New Mexico. The tracer test was conducted in 1963 and introduced significant quantities of radionuclides to the transmissive and laterally continuous Culebra dolomite. Groundwater in the Culebra near Gnome travels toward a regional discharge point at the Pecos River, a distance of about 10 to 15 km, depending on flow path. Groundwater transport of radionuclides from the Gnome site is therefore of interest due to the proximity of the accessible environment and the 31-year time period during which migration is likely to have occurred. The analytical stochastic solutions used incorporate the heterogeneity observed in the Culebra by treating transmissivity as a spatially correlated random field. The results indicate that significant spreading of tritium will occur in the Culebra dolomite as a result of the combination of relatively high transmissivity, high spatial variability, and high spatial correlation of transmissivity. Longitudinal spreading may cause a very small fraction of tritium mass to arrive at the Pecos River within the 31 years since the tracer test. However, dilution and transverse dispersion will act to distribute this mass over a very large volume, thereby reducing groundwater concentrations. Despite the high degree of spreading, the calculations indicate that most of the tritium remains near the source. At present, the center of mass is estimated to have moved approximately 260 m downgradient of the test location and about 95 percent of the mass is estimated to have remained within about 1 km downgradient

  18. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    NSTec Environmental Restoration

    2011-08-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information and process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  19. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility. Volume 1, Revision 2

    Weekes, D.C.; Lindsey, K.A.; Ford, B.H.; Jaeger, G.K.

    1996-12-01

    This document is the first in a two-volume series that comprise the site characterization report. Volume 1 contains data interpretation and information supporting the conclusions in the text (Appendices A through G). Volume 2 provides raw data. A site located between 200 East and 200 West Areas, in the central portion of the Hanford Site, was selected as the prime location for the ERDF. Modifications to the facility design minimize the footprint and have resulted in a significant reduction in the areal size. This change was initiated in part as a response to recommendations of the Hanford Future Site Uses Working Group to limit waste management activities to an exclusive zone within the squared-off boundary of the 200 Areas. Additionally, the reduction in size of the footprint was initiated to minimize impacts to ecology. The ERDF is designed for disposal of remediation wastes generated during the cleanup of Hanford Site and could be expanded to hold as much as 28 million yd 3 (21.4 million m 3 ) of solid waste

  20. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, {approximately} 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner.

  1. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, ∼ 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner

  2. Identification and characterization of radioactively contaminated sites in Ukraine and planning for environmental restoration activities

    Soroka, Y.

    2000-01-01

    In the Pridniprovsk-Krivoy Rog region uranium, titanium, iron and manganese ores were mined and milled beginning in the 1950s. These activities have caused radioactive contamination of the environment at some sites. In recent times intensive works concerning the surveying of contaminated areas and substantiating the need for remediation have been initiated. The research methodologies applied and the results from radiation surveys are presented for the site of the first uranium mine in the Ukraine, for tailings originating from the Pridniprovsk Chemical Plant (PChP), for the recultivated dump-site of the former 'O'-mine, as well as for the wastes, raw materials and production of the Nicopol Ferro-Alloy Plant. The planning procedure for the remediation activities at the town of Zhovty Vody is described. (author)

  3. Installation Restoration Program. Ohio Air National Guard, Toledo Express Airport, Swanton, Ohio. Site Investigation Work Plan

    1990-09-01

    Initially, cuttings from the borings and wells will be placed on plastic sheeting, covered, and left at the drilling site until a determination can be...Spwmxds Solids (K160.2) X X X X X Nitrate - Nitrate (PE3M.1) X X X X X tPhysical Caracteristics : Soil Enginering Classificatim X X X X X X X X (MQ8-84...site, soil cuttings from drilling the borings and wells will be placed on a plastic tarp and covered until samples of the soil have been screened using

  4. Installation Restoration Program. Phase 1. Records Search, Hazardous Materials Disposal Sites, Kirtland AFB, New Mexico

    1981-11-01

    hikers, skiers and snowmobilers. 1960TH COMMUNICATIONS SQUADRON Mission: Provides operation and maintenance of common-user communications facilities for...public and private records, interviews with knowledgeable parties and site visits. G- 1 -- 1 a)0 o4 i.) U ~ -0 w0.u 4-I (0 00) 0 4J -4 ).$4d 4.) 4-4 0 04

  5. Conceptual Site Treatment Plan Laboratory for Energy-Related Health Research Environmental Restoration Project

    Chapman, T.E.

    1993-10-01

    The Federal Facilities Compliance Act (the Act) of 1992 waives sovereign immunity for federal facilities for fines and penalties under the provisions of the Resource Recovery and Conservation Act, state, interstate, and local hazardous and solid waste management requirements. However, for three years the Act delays the waiver for violations involving US Department of Energy (DOE) facilities. The Act, however, requires that the DOE prepare a Conceptual Site Treatment Plan (CSTP) for each of its sites that generate or store mixed wastes (MWs). The purpose of the CSTP is to present DOE`s preliminary evaluations of the development of treatment capacities and technologies for treating a site`s MW. This CSTP presents the preliminary capacity and technology evaluation for the Laboratory for Energy-Related Health Research (LEHR). The five identified MW streams at LEHR are evaluated to the extent possible given available information. Only one MW stream is sufficiently well defined to permit a technology evaluation to be performed. Two other MW streams are in the process of being characterized so that an evaluation can be performed. The other two MW streams will be generated by the decommissioning of inactive facilities onsite within the next five years.

  6. Joint inversion of geophysical data for site characterization and restoration monitoring. 1998 annual progress report

    Berge, P.A.; Berryman, J.G.; Roberts, J.J.; Wildenschild, D.

    1998-01-01

    'The purpose of this project is to develop a computer code for joint inversion of seismic and electrical data, to improve underground imaging for site characterization and remediation monitoring. The computer code developed in this project will invert geophysical data to obtain direct estimates of porosity and saturation underground, rather than inverting for seismic velocity and electrical resistivity or other geophysical properties. This is intended to be a significant improvement in the state-of-the-art of underground imaging, since interpretation of data collected at a contaminated site would become much less subjective. Potential users include DOE scientists and engineers responsible for characterizing contaminated sites and monitoring remediation of contaminated sites. In this three-year project, the authors use a multi-phase approach consisting of theoretical and numerical code development, laboratory investigations, testing on available laboratory and borehole geophysics data sets, and a controlled field experiment, to develop practical tools for joint electrical and seismic data interpretation. This report summarizes work after about 1.7 years of a 3-year project. Progress on laboratory measurements is described first, followed by progress on developing algorithms for the inversion code to relate geophysical data to porosity and saturation.'

  7. Restoration principles and criteria: superfund program policy for cleanup at radiation contaminated sites

    Walker, Stuart

    2006-01-01

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) is responsible for implementing the long-term (non-emergency) portion of a key U.S. law regulating cleanup: the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed 'Superfund'. The purpose of the Superfund program is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund program. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in a consistent manner as with chemical contamination, except to account for the technical differences between radionuclides and chemicals. This consistency is important since at every radioactively contaminated site being addressed under Superfund's primary program for long-term cleanup, the National Priorities List (NPL), chemical contamination is also present. (author)

  8. Environmental tracers for elucidating the weathering process in a phosphogypsum disposal site: Implications for restoration

    Pérez-López, Rafael; Nieto, José M.; de la Rosa, Jesús D.; Bolívar, Juan P.

    2015-10-01

    This study provides geochemical data with the aim of identifying and tracing the weathering of phosphogypsum wastes stack-piled directly on salt-marshes of the Tinto River (Estuary of Huelva, SW Spain). With that purpose, different types of highly-polluted acid solutions were collected in the stack. Connection between these solutions and the estuarine environment was studied by geochemical tracers, such as rare earth elements (REE) and their North American Shale Composite (NASC)-normalized patterns and Cl/Br ratios. Phosphogypsum-related wastewaters include process water stored on the surface, pore-water contained in the phosphogypsum profile and edge outflow water emerging from inside the stack. Edge outflow waters are produced by waterlogging at the contact between phosphogypsum and the nearly impermeable marsh surface and discharge directly into the estuary. Process water shows geochemical characteristics typical of phosphate fertilizers, i.e. REE patterns with an evident enrichment of heavy-REE (HREE) with respect to middle-REE (MREE) and light-REE (LREE). By contrast, REE patterns of deeper pore-water and edge outflows are identical to those of Tinto River estuary waters, with a clear enrichment of MREE relative to LREE and HREE denoting influence of acid mine drainage. Cl/Br ratios of these solutions are very close to that of seawater, which also supports its estuarine origin. These findings clearly show that process water is not chemically connected with edge outflows through pore-waters, as was previously believed. Phosphogypsum weathering likely occurs by an upward flow of seawater from the marsh because of overpressure and permeability differences. Several recommendations are put forward in this study to route restoration actions, such as developing treatment systems to improve the quality of the edge outflow waters before discharging to the receiving environment.

  9. The environmental restoration in the management of radiological accidents with off site consequences

    Vazquez, C.; Montero, M.; Moraleda, M.; Diaz, J.; Claver, F.; Valles, O.; Rodriguez, N.; Gutierrez, J.

    1998-01-01

    Radiological accidents are among the potential cases of environmental contamination that could have consequences on the health of the population. These accidents, associated with an increase in the level of radiological exposure surpassing the natural background, have been investigated in greater depth than other conventional accidents. This investigation has included the evaluation of their probability, magnitude and consequences in order to establish safety norms. Nevertheless, the social perception of this type of risk appears to be disproportionately high. The development of a comprehensible and adequate standardized system for the evaluation of the radiological risk and the applicability of corrective actions to reduce this type of risk at local level, will undoubtedly contribute to increase the public confidence in the advised options for the restoration of environments contaminated with the long lived radionuclides. This system should consider the local specificity of each contaminated place, and take into account the associated unwanted consequences for each option. This paper presents the first results of a system to help the decision makers in the quantitative evaluation of the radiological risk produced by long lived radionuclides Cs 137, Cs 134 and Sr 90 spread over urban, agricultural and semi-natural environments and the applicable options to reduce it. The evaluation of these applicable options is made considering the reduction of dose that can be reached, the monetary costs and the significant associated secondary effects if there are any. All these factors are integrated for a time period depending on the half-life of the contaminants and on their strength and distribution on the scenario when intervention is being planned. (authors)

  10. Nariva Swamp Ramsar Site, Trinidad and Tobago (West Indies) Wetland Habitat Restoration Initiative

    Montserrat Carbonell; Nadra Nathai-Gyan

    2005-01-01

    Trinidad and Tobago, a twin island nation, is the most southerly of the Caribbean islands and lies just 11 km off the coast of Venezuela, near the Orinoco delta. Trinidad, the larger of the two islands, is approximately 5,000 km² and the Nariva Swamp is located on its eastern coast (fig. 1). In 1993, this site was designated as a wetland of international...

  11. Can the benefits of physical seabed restoration justify the costs? An assessment of a disused aggregate extraction site off the Thames Estuary, UK.

    Cooper, Keith; Burdon, Daryl; Atkins, Jonathan P; Weiss, Laura; Somerfield, Paul; Elliott, Michael; Turner, Kerry; Ware, Suzanne; Vivian, Chris

    2013-10-15

    Physical and biological seabed impacts can persist long after the cessation of marine aggregate dredging. Whilst small-scale experimental studies have shown that it may be possible to mitigate such impacts, it is unclear whether the costs of restoration are justified on an industrial scale. Here we explore this question using a case study off the Thames Estuary, UK. By understanding the nature and scale of persistent impacts, we identify possible techniques to restore the physical properties of the seabed, and the costs and the likelihood of success. An analysis of the ecosystem services and goods/benefits produced by the site is used to determine whether intervention is justified. Whilst a comparison of costs and benefits at this site suggests restoration would not be warranted, the analysis is site-specific. We emphasise the need to better define what is, and is not, an acceptable seabed condition post-dredging. Crown Copyright © 2013. Published by Elsevier Ltd. All rights reserved.

  12. Conceptual Site Treatment Plan Laboratory for Energy-Related Health Research Environmental Restoration Project

    Chapman, T.E.

    1993-10-01

    The Federal Facilities Compliance Act (the Act) of 1992 waives sovereign immunity for federal facilities for fines and penalties under the provisions of the Resource Recovery and Conservation Act, state, interstate, and local hazardous and solid waste management requirements. However, for three years the Act delays the waiver for violations involving US Department of Energy (DOE) facilities. The Act, however, requires that the DOE prepare a Conceptual Site Treatment Plan (CSTP) for each of its sites that generate or store mixed wastes (MWs). The purpose of the CSTP is to present DOE's preliminary evaluations of the development of treatment capacities and technologies for treating a site's MW. This CSTP presents the preliminary capacity and technology evaluation for the Laboratory for Energy-Related Health Research (LEHR). The five identified MW streams at LEHR are evaluated to the extent possible given available information. Only one MW stream is sufficiently well defined to permit a technology evaluation to be performed. Two other MW streams are in the process of being characterized so that an evaluation can be performed. The other two MW streams will be generated by the decommissioning of inactive facilities onsite within the next five years

  13. Restoration principles and criteria: Superfund programme policy for cleanup at radiation contaminated sites

    Shapiro, M.

    2000-01-01

    The Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response is responsible for implementing two key US laws regulating waste management and cleanup: the Resource Conservation and Recovery Act, and the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed ''Superfund''. The purpose of the Superfund programme is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund programme. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in the identical way as chemical contamination. (author)

  14. Restoration of an urban site affected by a monazite processing plant

    Lauria, D.C.; Zenaro, R.; Sachett, I.A.

    2000-01-01

    For half a century the Santo Amaro Mill, USAM, processed monazite sand in order to isolate rare earth elements. At the beginning of its operation, the mill was located far from the centre of Sao Paulo city. However, over the years the city spread and engulfed the mill, which, together with economical and radiological problems, led to its being shutdown and later decommissioned. After the dismantling the equipment and the demolition of the buildings, a radiological survey was carried out, leading to the release of the site for unrestricted use. Based on a future residential occupation scenario complying with a dose limit of 1 mSv/y, it was concluded that a 0.65 Bq/g value of activity concentration of 228 Ra in the soil was the allowable residual limit of contamination for the site. The strategy to verify this requirement for site release comprised a preliminary soil survey by direct total gamma measurement with a sodium iodine scintillator detector, direct local gross alpha and beta counting of soil samples for monitoring during cleanup, and germanium detector gamma spectrometry of soil grab samples for the validation of monitoring methods. (author)

  15. Mercury behaviour and C, N, and P biogeochemical cycles during ecological restoration processes of old mining sites in French Guiana.

    Couic, Ewan; Grimaldi, Michel; Alphonse, Vanessa; Balland-Bolou-Bi, Clarisse; Livet, Alexandre; Giusti-Miller, Stéphanie; Sarrazin, Max; Bousserrhine, Noureddine

    2018-04-25

    Several decades of gold mining extraction activities in the Amazonian rainforest have caused deforestation and pollution. While ecological rehabilitation is essential for restoring biodiversity and decreasing erosion on deforested lands, few studies note the behaviour or toxicity of trace elements during the rehabilitation process. Our original study focused on the potential use of microbial activity and Hg speciation and compared them with As, Cu, Zn and Cr speciation in assessing the chemical and biological quality of ecological restoration efforts. We sampled two sites in French Guyana 17 years after rehabilitation efforts began. The former site was actively regenerated (R) with the leguminous species Clitoria racemosa and Acacia mangium, and the second site was passively regenerated with spontaneous vegetation (Sv). We also sampled soil from a control site without a history of gold mining (F). We performed microcosm soil experiments for 30 days, where trace element speciation and enzyme activities (i.e., FDA, dehydrogenase, β-glucosidase, urease, alkaline and acid phosphatase) were estimated to characterise the behaviour of trace elements and the soil microbial activity. As bioindicators, the use of soil microbial carbon biomass and soil enzyme activities related to the carbon and phosphorus cycles seems to be relevant for assessing soil quality in rehabilitated and regenerated old mining sites. Our results showed that restoration with leguminous species had a positive effect on soil chemical quality and on soil microbial bioindicators, with activities that tended toward natural non-degraded soil (F). Active restoration processes also had a positive effect on Hg speciation by reducing its mobility. While in Sv we found more exchangeable and soluble mercury, in regenerated sites, Hg was mostly bound to organic matter. These results also suggested that enzyme activities and mercury cycles are sensitive to land restoration and must be considered when evaluating

  16. Oak Ridge National Laboratory Radiation Control Program - Partners in Site Restoration

    Jones, S. L.; Stafford, M. W.

    2002-01-01

    In 1998, the U.S. Department of Energy (DOE) awarded the Management and Integration (M and I) contract for all five of the Oak Ridge Operations (ORO) facilities to Bechtel Jacobs Company LLC (BJC). At Oak Ridge National Laboratory (ORNL), a world renowned national laboratory and research and development facility, the BJC mission involves executing the DOE Environmental Management (EM) program. In addition to BJC's M and I contract, UT-Battelle, LLC, a not-for-profit company, is the Management and Operating (M and O) contractor for DOE on the ORNL site. As part of ORNL's EM program, legacy inactive facilities (i.e., reactors, nuclear material research facilities, burial grounds, and underground storage tanks) are transferred to BJC and are designated as remediation, decontamination and decommissioning (D and D), or long-term surveillance and maintenance (S and M) facilities. Facilities operated by both UT-Battelle and BJC are interspersed throughout the site and are usually in close proximity. Both UT-Battelle and BJC have DOE-approved Radiation Protection Programs established in accordance with 10 CFR 835. The BJC Radiological Control (RADCON) Program adapts to the M and I framework and is comprised of a combination of subcontracted program responsibilities with BJC oversight. This paper focuses on the successes and challenges of executing the BJC RADCON Program for BJC's ORNL Project through a joint M and I contractor relationship, while maintaining a positive working relationship and partnership with UT-Battelle's Radiation Protection organization

  17. An alternative for cost-effective remediation of depleted uranium (DU) at certain environmental restoration sites

    Miller, M.; Galloway, B.; VanDerpoel, G.; Johnson, E.; Copland, J.; Salazar, M.

    2000-01-01

    Numerous sites in the United States and around the world are contaminated with depleted uranium (DU) in various forms. A prevalent form is fragmented DU originating from various scientific tests involving high explosives and DU during weapon development programs, at firing practice ranges, or war theaters where DU was used in armor-piercing projectiles. The contamination at these sites is typically very heterogeneous, with discreet, visually identifiable DU fragments mixed with native soil. That is, the bulk-averaged DU activity is quite low, while specific DU fragments, which are distinct from the soil matrix, have much higher specific activity. DU is best known as a dark, black metal that is nearly twice as dense as lead, but DU in the environment readily weathers to a distinctive bright yellow color that is readily visible. While the specific activity of DU is relatively low and presents only a minor radiological hazard, the fact that it is radioactive and visually identifiable makes it desirable to remove the DU contamination from the environment

  18. An alternative for cost-effective remediation of depleted uranium (DU) at certain environmental restoration sites

    Miller, M.; Galloway, B.; VanDerpoel, G.; Johnson, E.; Copland, J.; Salazar, M.

    2000-02-01

    Numerous sites in the United States and around the world are contaminated with depleted uranium (DU) in various forms. A prevalent form is fragmented DU originating from various scientific tests involving high explosives and DU during weapon development programs, at firing practice ranges, or war theaters where DU was used in armor-piercing projectiles. The contamination at these sites is typically very heterogeneous, with discreet, visually identifiable DU fragments mixed with native soil. That is, the bulk-averaged DU activity is quite low, while specific DU fragments, which are distinct from the soil matrix, have much higher specific activity. DU is best known as a dark, black metal that is nearly twice as dense as lead, but DU in the environment readily weathers to a distinctive bright yellow color that is readily visible. While the specific activity of DU is relatively low and presents only a minor radiological hazard, the fact that it is radioactive and visually identifiable makes it desirable to remove the DU contamination from the environment.

  19. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada

    A. T. Urbon

    2001-09-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 326, Areas 6 and 27 Release Sites. This CAU is currently listed in the January 2001, Appendix III of the Federal Facilities Agreement and Consent Order (FFACO) (FFACO, 1996). CAU 326 is located on the Nevada Test Site (NTS) and consists of the following four Corrective Action Sites (CASS) (Figure 1): CAS 06-25-01--Is a rupture in an underground pipe that carried heating oil (diesel) from the underground heating oil tank (Tank 6-CP-1) located to the west of Building CP-70 to the boiler in Building CP-1 in the Area 6 Control Point (CP) compound. CAS 06-25-02--A heating oil spill that is a result of overfilling an underground heating oil tank (Tank 6-DAF-5) located at the Area 6 Device Assembly Facility (DAF). CAS 06-25-04--A release of waste oil that occurred while removing used oil to from Tank 6-619-4. Tank 6-619-4 is located northwest of Building 6-619 at the Area 6 Gas Station. CAS 27-25-01--Consists of an excavation that was created in an attempt to remove impacted stained soil from the Site Maintenance Yard in Area 27. Approximately 53.5 cubic meters (m{sup 3}) (70 cubic yards [yd{sup 3}]) of soil impacted by total petroleum hydrocarbons (TPH) and polychlorinated biphenyls (PCBs) was excavated before the excavation activities were halted. The excavation activities were stopped because the volume of impacted soil exceeded estimated quantities and budget.

  20. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 330: Areas 6, 22, and 23 Tanks and Spill Sites, Nevada Test Site, Nevada

    T. M. Fitzmaurice

    2001-08-01

    This Streamlined Approach for Environmental restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 330, Areas 6,22, and 23 Tanks and Spill Sites. The CAUs are currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO). This CAU is located at the Nevada Test Site (NTS) (Figure 1). CAU 330 consists of the following Corrective Action Sites (CASs): (1) CAS 06-02-04 - Consists of an underground tank and piping. This CAS is close to an area that was part of the Animal Investigation Program (AIP), conducted under the U.S. Public Health Service. Its purpose was to study and perform tests on the cattle and wild animals in and around the NTS that were exposed to radionuclides. It is unknown if this tank was part of these operations. (2) CAS 22-99-06 - Is a fuel spill that is believed to be a waste oil release which occurred when Camp Desert Rock was an active facility. This CAS was originally identified as being a small depression where liquids were poured onto the ground, located on the west side of Building T-1001. This building has been identified as housing a fire station, radio station, and radio net remote and telephone switchboard. (3) CAS 23-01-02 - Is a large aboveground storage tank (AST) farm that was constructed to provide gasoline and diesel storage in Area 23. The site consists of two ASTs, a concrete foundation, a surrounding earthen berm, associated piping, and unloading stations. (4) CAS 23-25-05 - Consists of an asphalt oil spill/tar release that contains a wash covered with asphalt oil/tar material, a half buried 208-liter (L) (55-gallon [gal]) drum, rebar, and concrete located in the vicinity.

  1. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 330: Areas 6, 22, and 23 Tanks and Spill Sites, Nevada Test Site, Nevada; TOPICAL

    T. M. Fitzmaurice

    2001-01-01

    This Streamlined Approach for Environmental restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 330, Areas 6,22, and 23 Tanks and Spill Sites. The CAUs are currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO). This CAU is located at the Nevada Test Site (NTS) (Figure 1). CAU 330 consists of the following Corrective Action Sites (CASs): (1) CAS 06-02-04 - Consists of an underground tank and piping. This CAS is close to an area that was part of the Animal Investigation Program (AIP), conducted under the U.S. Public Health Service. Its purpose was to study and perform tests on the cattle and wild animals in and around the NTS that were exposed to radionuclides. It is unknown if this tank was part of these operations. (2) CAS 22-99-06 - Is a fuel spill that is believed to be a waste oil release which occurred when Camp Desert Rock was an active facility. This CAS was originally identified as being a small depression where liquids were poured onto the ground, located on the west side of Building T-1001. This building has been identified as housing a fire station, radio station, and radio net remote and telephone switchboard. (3) CAS 23-01-02 - Is a large aboveground storage tank (AST) farm that was constructed to provide gasoline and diesel storage in Area 23. The site consists of two ASTs, a concrete foundation, a surrounding earthen berm, associated piping, and unloading stations. (4) CAS 23-25-05 - Consists of an asphalt oil spill/tar release that contains a wash covered with asphalt oil/tar material, a half buried 208-liter (L) (55-gallon[gal]) drum, rebar, and concrete located in the vicinity

  2. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada; TOPICAL

    A. T. Urbon

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 326, Areas 6 and 27 Release Sites. This CAU is currently listed in the January 2001, Appendix III of the Federal Facilities Agreement and Consent Order (FFACO) (FFACO, 1996). CAU 326 is located on the Nevada Test Site (NTS) and consists of the following four Corrective Action Sites (CASS) (Figure 1): CAS 06-25-01-Is a rupture in an underground pipe that carried heating oil (diesel) from the underground heating oil tank (Tank 6-CP-1) located to the west of Building CP-70 to the boiler in Building CP-1 in the Area 6 Control Point (CP) compound. CAS 06-25-02-A heating oil spill that is a result of overfilling an underground heating oil tank (Tank 6-DAF-5) located at the Area 6 Device Assembly Facility (DAF). CAS 06-25-04-A release of waste oil that occurred while removing used oil to from Tank 6-619-4. Tank 6-619-4 is located northwest of Building 6-619 at the Area 6 Gas Station. CAS 27-25-01-Consists of an excavation that was created in an attempt to remove impacted stained soil from the Site Maintenance Yard in Area 27. Approximately 53.5 cubic meters (m(sup 3)) (70 cubic yards[yd(sup 3)]) of soil impacted by total petroleum hydrocarbons (TPH) and polychlorinated biphenyls (PCBs) was excavated before the excavation activities were halted. The excavation activities were stopped because the volume of impacted soil exceeded estimated quantities and budget

  3. Riparian and Upland Restoration at the U.S. Department of Energy Rocky Flats, Colorado, Site - 12360

    Nelson, Jody K. [S.M. Stoller Corporation, Contractor to the U.S. Department of Energy Office of Legacy Management, Westminster, Colorado 80021 (United States)

    2012-07-01

    oversight, and contractual limitations. A variety of ecological restoration techniques were conducted at the site to meet these challenges. These efforts have resulted in vegetation becoming well established in most locations. (author)

  4. Contrasting physiological responses of two co-occurring eucalypts to seasonal drought at restored bauxite mine sites.

    Szota, Christopher; Farrell, Claire; Koch, John M; Lambers, Hans; Veneklaas, Erik J

    2011-10-01

    This study describes the physiological response of two co-occurring tree species (Eucalyptus marginata and Corymbia calophylla) to seasonal drought at low- and high-quality restored bauxite mine sites in south-western Australia. Seasonal changes in photosynthesis (A), stomatal conductance (g(s)), leaf water potential (ψ), leaf osmotic potential (ψ), leaf relative water content (RWC) and pressure-volume analysis were captured over an 18-month field study to (i) determine the nature and severity of physiological stress in relation to site quality and (ii) identify any physiological differences between the two species. Root system restriction at the low-quality site reduced maximum rates of gas exchange (g(s) and A) and increased water stress (midday ψ and daily RWC) in both species during drought. Both species showed high stomatal sensitivity during drought; however, E. marginata demonstrated a higher dehydration tolerance where ψ and RWC fell to -3.2 MPa and 73% compared with -2.4 MPa and 80% for C. calophylla. Corymbia calophylla showed lower g(s) and higher ψ and RWC during drought, indicating higher drought tolerance. Pressure-volume curves showed that cell-wall elasticity of E. marginata leaves increased in response to drought, while C. calophylla leaves showed lower osmotic potential at zero turgor in summer than in winter, indicating osmotic adjustment. Both species are clearly able to tolerate seasonal drought at hostile sites; however, by C. calophylla closing stomata earlier in the drought cycle, maintaining a higher water status during drought and having the additional mechanism of osmotic adjustment, it may have a greater capacity to survive extended periods of drought.

  5. Installation Restoration Program. Phase 1. Records Search, Hazardous Materials Disposal Sites, Eglin AFB, Florida

    1981-10-01

    Okaloosa Co. 3-12 Crestview South Quadrangle, Florida-Okaloosa Co. -13 Mossy ead Quadrangle, Florida-Walton Co 3-14 E-1 EGUN AFB 4,h aa V, WRAMATIO...I) Um AYPM hIN1DS SP * So". AM T 0 Tou A is a O I. h E-2 ES ENGINEERING -SCIENCE V%777-7NN7 .7-7 EGUN AFB 0.4 .m ... (1) WMg LAN DOSAMU *Y* CO u...r Oumm *p S(S Ann~ Il~~O 0*aAMa 2-3 ES ENGINEER ING - SCIENCE EGUN AFB %Tt MAR ESTHER * : . . - . - ~ - ~ r W R G H T L A N D F I L L 3 SITE 0296

  6. Cost-Effective Remediation of Depleted Uranium (DU) at Environmental Restoration Sites

    MILLER, MARK; GALLOWAY, ROBERT B.; VANDERPOEL, GLENN; JOHNSON, ED; COPLAND, JOHN; SALAZAR, MICHAEL

    1999-01-01

    Numerous sites in the United States and around the world are contaminated with depleted uranium (DU) in various forms. A prevalent form is fragmented DU originating from various scientific tests involving high explosives and DU during weapon-development programs, at firing practice ranges, or in war theaters where DU was used in armor-piercing projectiles. The contamination at these sites is typically very heterogeneous, with discrete, visually identifiable DU fragments mixed with native soil. The bulk-averaged DU activity is quite low, whereas DU fragments, which are distinct from the soil matrix, have much higher specific activity. DU is best known as a dark metal that is nearly twice as dense as lead, but DU in the environment readily weathers (oxidizes) to a distinctive bright yellow color that is quite visible. While the specific activity (amount of radioactivity per mass of soil) of DU is relatively low and presents only a minor radiological hazard, the fact that DU is radioactive and visually identifiable makes it desirable to remove the DU ''contamination'' from the environment. The typical approach to conducting this DU remediation is to use radiation-detection instruments to identify the contaminant and then to separate it from the adjacent soil, packaging it for disposal as radioactive waste. This process can be performed manually or by specialized, automated equipment. Alternatively, a more cost-effective approach might be simple mechanical or gravimetric separation of the DU fragments from the host soil matrix. At SNL/NM, both the automated and simple mechanical approaches have recently been employed. This paper discusses the pros/cons of the two approaches

  7. An alternative for cost-effective remediation of depleted uranium (DU) at certain environmental restoration sites.

    Miller, M; Galloway, B; VanDerpoel, G; Johnson, E; Copland, J; Salazar, M

    2000-02-01

    Numerous sites in the United States and around the world are contaminated with depleted uranium (DU) in various forms. A prevalent form is fragmented DU originating from various scientific tests involving high explosives and DU during weapon development programs, at firing practice ranges, or war theaters where DU was used in armor-piercing projectiles. The contamination at these sites is typically very heterogeneous, with discreet, visually identifiable DU fragments mixed with native soil. That is, the bulk-averaged DU activity is quite low, while specific DU fragments, which are distinct from the soil matrix, have much higher specific activity. DU is best known as a dark, black metal that is nearly twice as dense as lead, but DU in the environment readily weathers (oxidizes) to a distinctive bright yellow color that is readily visible. While the specific activity (amount of radioactivity per mass of soil) of DU is relatively low and presents only a minor radiological hazard, the fact that it is radioactive and visually identifiable makes it desirable to remove the DU "contamination" from the environment. The typical approach to conducting this DU remediation is to use radiation detection instruments to identify the contaminant and separate it from the adjacent soil, packaging it for disposal as radioactive waste. This process can be performed manually or by specialized, automated equipment. Alternatively, in certain situations a more cost-effective approach might be simple mechanical or gravimetric separation of the DU fragments from the host soil matrix. At SNL/NM, both the automated and simple mechanical approaches have recently been employed. This paper discusses the pros/cons of the two approaches.

  8. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 538: Spill Sites, Nevada Test Site, Nevada, Rev. No.: 0

    Alfred Wickline

    2006-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 538: Spill Sites, Nevada Test Site, Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]). (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk. (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Division of Environmental Protection (NDEP) and where DOE will reach consensus with NDEP before beginning the next phase of work.

  9. Climate and site management as driving factors for the atmospheric greenhouse gas exchange of a restored wetland

    M. Herbst

    2013-01-01

    Full Text Available The atmospheric greenhouse gas (GHG budget of a restored wetland in western Denmark was established for the years 2009–2011 from eddy covariance measurements of carbon dioxide (CO2 and methane (CH4 fluxes. The water table in the wetland, which was restored in 2002, was unregulated, and the vegetation height was limited through occasional grazing by cattle and grass cutting. The annual net CO2 uptake varied between 195 and 983 g m−2 and the annual net CH4 release varied between 11 and 17 g m−2. In all three years the wetland was a carbon sink and removed between 42 and 259 g C m−2 from the atmosphere. However, in terms of the full annual GHG budget (assuming that 1 g CH4 is equivalent to 25 g CO2 with respect to the greenhouse effect over a time horizon of 100 years the wetland was a sink in 2009, a source in 2010 and neutral in 2011. Complementary observations of meteorological factors and management activities were used to explain the large inter-annual variations in the full atmospheric GHG budget of the wetland. The largest impact on the annual GHG fluxes, eventually defining their sign, came from site management through changes in grazing duration and animal stocking density. These changes accounted for half of the observed variability in the CO2 fluxes and about two thirds of the variability in CH4 fluxes. An unusually long period of snow cover in 2010 had the second largest effect on the annual CO2 flux, whose interannual variability was larger than that of the CH4 flux. Since integrated CO2 and CH4 flux data from restored wetlands are still very rare, it is concluded that more long-term flux measurements are needed to quantify the effects of ecosystem disturbance, in terms of management activities and exceptional weather patterns, on the atmospheric GHG budget more

  10. Restoring forests

    Jacobs, Douglass F.; Oliet, Juan A.; Aronson, James

    2015-01-01

    of land requiring restoration implies the need for spatial prioritization of restoration efforts according to cost-benefit analyses that include ecological risks. To design resistant and resilient ecosystems that can adapt to emerging circumstances, an adaptive management approach is needed. Global change......, in particular, imparts a high degree of uncertainty about the future ecological and societal conditions of forest ecosystems to be restored, as well as their desired goods and services. We must also reconsider the suite of species incorporated into restoration with the aim of moving toward more stress resistant...... and competitive combinations in the longer term. Non-native species may serve an important role under some circumstances, e.g., to facilitate reintroduction of native species. Propagation and field establishment techniques must promote survival through seedling stress resistance and site preparation. An improved...

  11. Plans for environmental restoration of uranium mining and milling sites in Bulgaria

    Nedyalkov, K.

    1997-01-01

    In 1992, uranium mining and milling industry in Bulgaria was closed down by Decree No. 163 of the Council of Ministers of the Republic of Bulgaria which defined the procedure for development of liquidation plans, their approval and the procedure for funding from the national budget. The 1994 Decree No. 56 of the Council of Ministers assigned the organization of the liquidation and rehabilitation activities to the Committee of Energy (later, in 1996, transformed to the Ministry of Energy and Energy Resources). An Interdepartmental Board of Experts including representatives of all concerned ministries and agencies was established to coordinate the above activities and to approve work plans. The main stages of liquidation of the uranium industry and its after-effects were defined as follows: (1) environmental status (maintenance of a minimized service mode in order to preserve the state of the site- environment system); (2) technical liquidation; (3) technical recultivation; (4) biological recultivation; (5) purification of contaminated waters; and (6) monitoring. In 1992 and 1993, preparation for the above activities was carried out by development of detailed preliminary studies and work plans for the first stage - the stage of technical liquidation. Their implementation was launched by evacuation of mining and drilling machinery, haulage and processing of finished products etc. (author)

  12. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V.2: Planning for environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    NONE

    1996-03-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. It is under these circumstances that the IAEA decided to launch a Technical Co-operation (TC) Project on Environmental Restoration in Central and Eastern Europe. The project was initiated in the latter part of 1992 and ended in 1994. The countries that were involved and represented in this forum are: Belarus, Bulgaria, Croatia, Czech Republic, Estonia, Hungary, Kazakhstan, Poland, Romania, Russian Federation, Slovakia, Slovenia and the Ukraine. Several experts from countries outside the region participated and offered their co-operation throughout the project. Refs, figs, tabs.

  13. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V.2: Planning for environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    1996-03-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. It is under these circumstances that the IAEA decided to launch a Technical Co-operation (TC) Project on Environmental Restoration in Central and Eastern Europe. The project was initiated in the latter part of 1992 and ended in 1994. The countries that were involved and represented in this forum are: Belarus, Bulgaria, Croatia, Czech Republic, Estonia, Hungary, Kazakhstan, Poland, Romania, Russian Federation, Slovakia, Slovenia and the Ukraine. Several experts from countries outside the region participated and offered their co-operation throughout the project. Refs, figs, tabs

  14. STREAMLINED APPROACH FOR ENVIRONMENTAL RESTORATION PLAN FOR CORRECTIVE ACTION UNIT 116: AREA 25 TEST CELL C FACILITY NEVADA TEST SITE, NEVADA

    2006-01-01

    This Streamlined Approach for Environmental Restoration Plan identifies the activities required for the closure of Corrective Action Unit 116, Area 25 Test Cell C Facility. The Test Cell C Facility is located in Area 25 of the Nevada Test Site approximately 25 miles northwest of Mercury, Nevada

  15. Environmental restoration project configuration control

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  16. Planning for environmental restoration of uranium mining and milling sites in Central and Eastern Europe. Proceedings of a workshop held under the technical co-operation project RER/9/022 on environmental restoration in Central and Eastern Europe

    1997-11-01

    An IAEA Regional Technical Co-operation (TC) project RER/9/022 on ''Environmental Restoration'' for central and eastern Europe and the former USSR was launched in 1992 and concluded at the end of 1996. The first phase of this project had the primary purpose of identifying and characterizing radioactively contaminated sites in the region, including evaluation of doses to the general public and other environmental impacts. The main result of this phase of the project were published in IAEA-TECDOC-865. A new 1995-1996 phase of the project focused on the radioactive contamination of uranium mining and milling sites and the development of plans for environmental restoration of these sites. While the 1993-1994 phase aimed at attracting the attention of Member States in the region to a long neglected problem, the second phase served as a stimulus to initiate concrete planning activities that would lead to corrective actions in highly contaminated areas in those countries. As a consequence, the project emphasis shifted from scientific discussions to the identification of responsibilities, planning activities, and the assessment of existing and required resources for the eventual implementation of restoration plans. The 1995-1996 phase of the project consisted of a planning meeting and three workshops that addressed different topical themes. The papers compiled in this publication were presented at the last workshop, held in Felix, Romania, 4-8 November 1996. They summarize national situations in environmental contamination as of the end of 1996 and ongoing or planned actions for remediation

  17. Multi-method characterization of low-level radioactive waste at two Sandia National Laboratories environmental restoration sites

    Johnson, C.E. Jr.; Galloway, R.B.; Dotson, P.W.

    1999-01-01

    This paper discusses the application of multiple characterization methods to radioactive wastes generated by the Sandia National Laboratories/New Mexico (SNL/NM) Environmental Restoration (ER) Project during the excavation of buried materials at the Classified Waste Landfill (CWLF) and the Radioactive Waste Landfill (RWL). These waste streams include nuclear weapon components and other refuse that are surface contaminated or contain sealed radioactive sources with unknown radioactivity content. Characterization of radioactive constituents in RWL and CWLF waste has been problematic, due primarily to the lack of documented characterization data prior to burial. A second difficulty derives from the limited information that ER project personnel have about weapons component design and testing that was conducted in the early days of the Cold War. To reduce the uncertainties and achieve the best possible waste characterization, the ER Project has applied both project-specific and industry-standard characterization methods that, in combination, serve to define the types and quantities of radionuclide constituents in the waste. The resulting characterization data have been used to develop waste profiles for meeting disposal site waste acceptance criteria

  18. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada (Revision No. 0, August 2001); FINAL

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, as identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site in Nevada, consists of seven Corrective Action Sites (CASs): CAS 03-04-01, Area 3 Change House Septic System; CAS 03-09-01, Mud Pit Spill Over; CAS 03-09-03, Mud Pit; CAS 03-09-04, Mud Pit; CAS 03-09-05, Mud Pit; CAS 20-16-01, Landfill; CAS 20-22-21, Drums. Sufficient information and process knowledge from historical documentation and investigations are the basis for the development of the phased approach chosen to address the data collection activities prior to implementing the preferred closure alternative for each CAS. The Phase I investigation will determine through collection of environmental samples from targeted populations (i.e., mud/soil cuttings above textural discontinuity) if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels (PALs) at each of the CASs. If COPCs are present above PALs, a Phase II investigation will be implemented to determine the extent of contamination to support the appropriate corrective action alternative to complete closure of the site. Groundwater impacts from potentially migrating contaminants are not expected due to the depths to groundwater and limiting hydrologic drivers of low precipitation and high evaporation rates. Future land-use scenarios limit future uses to industrial activities; therefore, future residential uses are not considered. Potential exposure routes to site workers from contaminants of concern in septage and soils include oral ingestion, inhalation, or dermal contact (absorption) through in-advertent disturbance of contaminated structures and/or soils. Diesel within drilling muds is expected to be the primary COPC based on process

  19. Nuclear Site Remediation and Restoration during Decommissioning of Nuclear Installations. A Report by the NEA Co-operative Programme on Decommissioning

    Orr, Peter; Mitchell, Nick; Mobbs, Shelly; Bennest, Terry; Abu-Eid, Rateb-Boby; Berton, Marie-Anne; Dehaye, Catherine Ollivier; Pellenz, Gilles; Cruikshank, Julian; Diaz Arocas, Paloma; Garcia Tapias, Ester; Hess, Norbert; Hong, Sam-Bung; Miller, Susan; Monken-Fernandes, Horst; ); Morse, John; Nitzsche, Olaf; Ooms, Bart; Osimani, Celso; Stuart Walker

    2014-01-01

    Decommissioning of nuclear facilities and related remedial actions are currently being undertaken around the world to enable sites or parts of sites to be reused for other purposes. Remediation has generally been considered as the last step in a sequence of decommissioning steps, but the values of prevention, long-term planning and parallel remediation are increasingly being recognised as important steps in the process. This report, prepared by the Task Group on Nuclear Site Restoration of the NEA Co-operative Programme on Decommissioning, highlights lessons learnt from remediation experiences of NEA member countries that may be particularly helpful to practitioners of nuclear site remediation, regulators and site operators. It provides observations and recommendations to consider in the development of strategies and plans for efficient nuclear site remediation that ensures protection of workers and the environment. (authors)

  20. Streamlined Approach for Environmental Restoration Work Plan for Corrective Action Unit 461: Joint Test Assembly Sites and Corrective Action Unit 495: Unconfirmed Joint Test Assembly Sites Tonopah Test Range, Nevada

    Jeff Smith

    1998-08-01

    This Streamlined Approach for Environmental Restoration plan addresses the action necessary for the clean closure of Corrective Action Unit 461 (Test Area Joint Test Assembly Sites) and Corrective Action Unit 495 (Unconfirmed Joint Test Assembly Sites). The Corrective Action Units are located at the Tonopah Test Range in south central Nevada. Closure for these sites will be completed by excavating and evaluating the condition of each artillery round (if found); detonating the rounds (if necessary); excavating the impacted soil and debris; collecting verification samples; backfilling the excavations; disposing of the impacted soil and debris at an approved low-level waste repository at the Nevada Test Site

  1. Environmental Restoration 1997 annual report

    Cosper, M.B.

    1997-01-01

    During 1997, the Environmental Restoration Program at the Savannah River Site achieved all of the ''Breakthrough Goals'' that were established with the regulatory agencies in 1995 to advance their cleanup efforts. Effective focus on field remediation was demonstrated by the allocation of 75% of program funding to remediation activities. The Remediation Phase is complete or has begun on sixty-nine waste sites that represent approximately 80% of the known environmental and health risk. The average time required for the assessment phase of active projects was reduced by 50%, from 49 to less than 24 months, which allows cleanup actions to start twice as fast as before. Breakthrough performance has tangible results. During 1997, all of the funding allocation was used effectively to accomplish environmental restoration scope worth over $123 million. That represents a validated cost efficiency of over 20% for the third straight year. Over half of the 500 contaminated acres at SRS have been cleaned up or are currently in the remediation phase. Almost 3 billion gallons of groundwater have been restored by removing over half a million pounds of organic solvents

  2. Exit site and tunnel infections in children on chronic peritoneal dialysis: findings from the Standardizing Care to Improve Outcomes in Pediatric End Stage Renal Disease (SCOPE) Collaborative.

    Swartz, Sarah J; Neu, Alicia; Skversky Mason, Amy; Richardson, Troy; Rodean, Jonathan; Lawlor, John; Warady, Bradley; Somers, Michael J G

    2018-06-01

    The Standardizing Care to Improve Outcomes in Pediatric End Stage Renal Disease (SCOPE) Collaborative is a quality improvement initiative to reduce dialysis-associated infections. The frequency of peritoneal dialysis (PD) catheter exit site infection (ESI) and variables influencing its development and end result are unclear. We sought to determine ESI rates, to elucidate the epidemiology, risk factors, and outcomes for ESI, and to assess for association between provider compliance with care bundles and ESI risk. We reviewed demographic, dialysis and ESI data, and care bundle adherence and outcomes for SCOPE enrollees from October 2011 to September 2014. ESI involved only the exit site, only the subcutaneous catheter tunnel, or both. A total of 857 catheter insertions occurred in 734 children over 10,110 cumulative months of PD provided to these children. During this period 207 ESIs arose in 124 children or 0.25 ESIs per dialysis year. Median time to ESI was 392 days, with 69% of ESIs involving exit site only, 23% involving the tunnel only, and 8% involving both sites. Peritonitis developed in 6%. ESI incidence was associated with age (p = 0.003), being the lowest in children aged  0 at prior month's visit (p treatment, 24% required hospitalization, and 9% required catheter removal, generally secondary to tunnel infection. Exit site infections occur at an annualized rate of 0.25, typically well into the dialysis course. Younger patient age and documented review of site care are associated with lower ESI rates. Although most ESIs resolve, hospitalization is frequent, and tunnel involvement/catheter loss complicate outcomes.

  3. National Public Information Symposium on Peaceful Uses of Nuclear Energy, NUC Info'2000. Radioactive Waste Management and Site Restoration in Uranium Industry. Proceedings. Volume 1

    Dobos, Ion; Comsa, Olivia

    2000-01-01

    These proceedings published in two volumes contain materials presented at the National Public Information Symposium on Peaceful Uses of Nuclear Energy, NUC Info'2000, Radioactive Waste Management and Site Restoration in Uranium Industry, held on 5. September to 8. September 2000 at Baita Bihor, Romania. As the name of Symposium indicates, this manifestation is addressed not only to specialists but rather to the public at large. The proceedings are structured in 4 sections: 1. Management of radioactive waste arising from uranium mining, milling and decommissioning; 2. Uranium mine close-down; 3. Environmental restoration of uranium mining and milling sites; 4. Management of radioactive waste arising from nuclear applications. The first volume also contains an inaugural session dedicated to nuclear power, nuclear fuel cycle and development of uranium industry in Romania. The contributions in the first volume deal with the management of radioactive waste arising from uranium mining, milling and decommissioning and uranium mine close-out

  4. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 484: Surface Debris, Waste Sites, and Burn Area, Tonopah Test Range, Nevada

    Bechel Nevada

    2004-01-01

    This Streamlined Approach for Environmental Restoration plan details the activities necessary to close Corrective Action Unit (CAU) 484: Surface Debris, Waste Sites, and Burn Area (Tonopah Test Range). CAU 484 consists of sites located at the Tonopah Test Range, Nevada, and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order. CAU 484 consists of the following six Corrective Action Sites: (1) CAS RG-52-007-TAML, Davis Gun Penetrator Test; (2) CAS TA-52-001-TANL, NEDS Detonation Area; (3) CAS TA-52-004-TAAL, Metal Particle Dispersion Test; (4) CAS TA-52-005-TAAL, Joint Test Assembly DU Sites; (5) CAS TA-52-006-TAPL, Depleted Uranium Site; and (6) CAS TA-54-001-TANL, Containment Tank and Steel Structure

  5. 1998 Annual Report - Environmental Restoration Division

    Davis, L.B.

    1998-01-01

    This is a 1998 annual report for Environmental Restoration. Environmental Restoration's accomplishments were significant in 1998. The division, including its support organizations, completed one year without a lost time accident. It also met 111 enforceable agreement milestones on time, with more than 80% ahead of schedule. Funds used to meet these milestones were effectively utilized and $9.63 million in regulatory scope was added. Twelve new, innovative technologies were deployed, enabling ER to achieve significant progress on major field remediation projects, including: Remediation of 25 acres of radioactive burial ground; Removal of 1,300 batteries for recycling; Removal and safe storage of a radioactive underground tank; Extraction of 115,000 pounds of solvent; and Installation of 9 new recirculation wells and a second GeoSiphon Cell for additional removal of solvent Final Records of Decision were made for 9 base unit sites. No Further Action decisions were made for 61 additional sites

  6. Planning for environmental restoration of uranium mining and milling sites in Central and Eastern Europe. Proceedings of a workshop held under the technical co-operation project RER/9/022 on environmental restoration in Central and Eastern Europe

    NONE

    1997-11-01

    An IAEA Regional Technical Co-operation (TC) project RER/9/022 on ``Environmental Restoration`` for central and eastern Europe and the former USSR was launched in 1992 and concluded at the end of 1996. The first phase of this project had the primary purpose of identifying and characterizing radioactively contaminated sites in the region, including evaluation of doses to the general public and other environmental impacts. The main result of this phase of the project were published in IAEA-TECDOC-865. A new 1995-1996 phase of the project focused on the radioactive contamination of uranium mining and milling sites and the development of plans for environmental restoration of these sites. While the 1993-1994 phase aimed at attracting the attention of Member States in the region to a long neglected problem, the second phase served as a stimulus to initiate concrete planning activities that would lead to corrective actions in highly contaminated areas in those countries. As a consequence, the project emphasis shifted from scientific discussions to the identification of responsibilities, planning activities, and the assessment of existing and required resources for the eventual implementation of restoration plans. The 1995-1996 phase of the project consisted of a planning meeting and three workshops that addressed different topical themes. The papers compiled in this publication were presented at the last workshop, held in Felix, Romania, 4-8 November 1996. They summarize national situations in environmental contamination as of the end of 1996 and ongoing or planned actions for remediation. Refs, figs, tabs.

  7. Climate and site management as driving factors for the atmospheric greenhouse gas exchange of a restored wetland

    Herbst, Mathias; Friborg, Thomas; Schelde, K.

    2013-01-01

    The atmospheric greenhouse gas (GHG) budget of a restored wetland in western Denmark was established for the years 2009–2011 from eddy covariance measurements of carbon dioxide (CO2) and methane (CH4) fluxes. The water table in the wetland, which was restored in 2002, was unregulated......2 and CH4 flux data from restored wetlands are still very rare, it is concluded that more long-term flux measurements are needed to quantify the effects of ecosystem disturbance, in terms of management activities and exceptional weather patterns, on the atmospheric GHG budget more accurately......., and the vegetation height was limited through occasional grazing by cattle and grass cutting. The annual net CO2 uptake varied between 195 and 983 g m−2 and the annual net CH4 release varied between 11 and 17 g m−2. In all three years the wetland was a carbon sink and removed between 42 and 259 g C m−2 from...

  8. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    Smith, J. L.

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS)

  9. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    J. L. Smith

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS).

  10. Vegetation succession in restoration of disturbed sites in Central Europe: the direction of succession and species richness across 19 seres

    Prach, Karel; Řehounková, Klára; Lencová, K.; Jírová, Alena; Konvalinková, P.; Mudrák, Ondřej; Študent, V.; Vaněček, Z.; Tichý, L.; Petřík, Petr; Šmilauer, P.; Pyšek, Petr

    2014-01-01

    Roč. 17, č. 2 (2014), s. 193-200 ISSN 1402-2001 R&D Projects: GA ČR(CZ) GAP505/11/0256 Institutional support: RVO:67985939 Keywords : ordination * restoration * target species Subject RIV: EH - Ecology, Behaviour Impact factor: 2.548, year: 2014

  11. Installation restoration program site investigation. Gulfport Field Training Site, Mississippi Air National Guard Gulfport-Biloxi Regional Airport Gulfport, Mississippi. Volume 2. Final report

    NONE

    1992-12-01

    Site Investigation Report, Volume: 2. A Site Investigation was performed at 3 sites at the Combat Readiness Training Center, Gulfport-Bolixi. The 3 sites investigated are the: Former Fire Training Area (Site 1), the Former JP-4 Bulk Storage Area, Mill Road (Site 2), and the Motor Pool Above-Ground Diesel Fuel Storage Tank Area (Site 3). The findings of this investigation recommended further investigation at the Fire Training Area and the JP-4 Bulk Storage Tank. At Site 3 the levels of contamination did not represent a risk to human health or the environment; therefore, no further action was recommended. Volume two of this report consisted of the following Appendixes: Site Photographs (A), Well Inventory (B), Boring Logs (C), CSL Technical Memorandum (D), Data Review and Validation (E), GPS Memorandum (F), Level C Analytical Data Summary Tables (G), Slug Test (H), Special-Status Species (I), and Representative Species of Less Mobile Fish and Wildlife (J).

  12. Streamlined approach for environmental restoration closure report for Corrective Action Unit 464: Historical underground storage tank release sites, Nevada Test Site, Nevada

    1998-04-01

    This report addresses the site characterization of two historical underground storage tank petroleum hydrocarbon release sites identified by Corrective Action Site (CAS) Numbers 02-02-03 and 09-02-01. The sites are located at the Nevada Test Site in Areas 2 and 9 and are concrete bunker complexes (Bunker 2-300, and 9-300). Characterization was completed using drilling equipment to delineate the extent of petroleum hydrocarbons at release site 2-300-1 (CAS 02-02-03). Based on site observations, the low hydrocarbon concentrations detected, and the delineation of the vertical and lateral extent of subsurface hydrocarbons, an ''A through K'' evaluation was completed to support a request for an Administrative Closure of the site

  13. Streamlined approach for environmental restoration closure report for Corrective Action Unit 464: Historical underground storage tank release sites, Nevada Test Site, Nevada

    NONE

    1998-04-01

    This report addresses the site characterization of two historical underground storage tank petroleum hydrocarbon release sites identified by Corrective Action Site (CAS) Numbers 02-02-03 and 09-02-01. The sites are located at the Nevada Test Site in Areas 2 and 9 and are concrete bunker complexes (Bunker 2-300, and 9-300). Characterization was completed using drilling equipment to delineate the extent of petroleum hydrocarbons at release site 2-300-1 (CAS 02-02-03). Based on site observations, the low hydrocarbon concentrations detected, and the delineation of the vertical and lateral extent of subsurface hydrocarbons, an ``A through K`` evaluation was completed to support a request for an Administrative Closure of the site.

  14. Climate and site management as driving factors for the atmospheric greenhouse gas exchange of a restored wetland

    Herbst, Mathias; Friborg, Thomas; Schelde, Kirsten

    2012-01-01

    The full atmospheric greenhouse gas (GHG) budget of a restored wetland in Western Denmark could be established for the years 2009–2011 from eddy covariance measurements of carbon dioxide (CO2) and methane (CH4) fluxes. The water table in the wetland, being restored in 2002, was unregulated...... patterns through an unusually long period of snow cover in the second year of observations. Since integrated CO2 and CH4 flux data from restored wetlands are still very rare, it is concluded that more long-term flux measurements are needed to predict the role of this land use type in the atmospheric GHG......, and the vegetation height was limited through occasional grazing by cattle and grass cutting. The annual net CO2 uptake varied between 195 and 983 g m−2 and the annual net CH4 release varied between 11 and 17 g m−2. In all three years the wetland was a carbon sink and removed between 42 and 259 g C m−2 from...

  15. Siting of nuclear power stations and the scope of preoperational investigations with special considerations of demographic aspects and the economic utilization of the neighbouring areas

    Bijak, J.

    1976-01-01

    The studies are presented on the location of atomic power stations in Poland made so far. The methods used in the studies are described which were done in two stages: preliminary location studies on the macroregional scale, and location studies on one or more of the chosen locations. Part one deals with general conditions which have to be met for location of atomic power stations and with preliminary assumptions accepted by GBS i PE ''Energoprojekt'' for location studies. Regulations and recommendations for establishing sites for atomic power stations are also given. Special location conditions are dealt with more extensively, the enviromental hazards and the need for their studies being particularly emphasized. Part two describes the scope of studies made prior to and after the time location investigations. Demographic studies and the economic utilization of the neighbouring areas are presented in more detail. (author)

  16. Siting of nuclear power stations and the scope of preoperational investigations with special considerations of demographic aspects and the economic utilization of the neighbouring areas. [Poland

    Bijak, J [Biuro Studiow i Projektow ' Energoprojekt' , Warsaw (Poland)

    1976-01-01

    Studies are presented on the location of atomic power stations in Poland. The methods used in the studies are described which were done in two stages: preliminary location studies on the macroregional scale, and location studies on one or more of the chosen locations. Part one deals with general conditions which have to be met for location of atomic power stations and with preliminary assumptions accepted by GBS i PE ''Energoprojekt'' for location studies. Regulations and recommendations for establishing sites for atomic power stations are also given. Special location conditions are dealt with more extensively, the enviromental hazards and the need for their studies being particularly emphasized. Part two describes the scope of studies made prior to and after the time location investigations. Demographic studies and the economic utilization of the neighbouring areas are presented in more detail.

  17. Regulatory and institutional issues impending cleanup at US Department of Energy sites: Perspectives gained from an office of environmental restoration workshop

    Fallon, W E; Gephart, J M; Gephart, R E; Quinn, R D; Stevenson, L A

    1991-05-01

    The US Department of Energy's (DOE) nuclear weapons and energy operations are conducted across a nation-wide industrial complex engaged in a variety of manufacturing, processing, testing, and research and development activities. The overall mission of DOE Office of Environmental Restoration and Waste Management (EM) is to protect workers, the public, and the environment from waste materials generated by past, current, and future DOE activities and to bring the DOE complex into compliance with all applicable laws, regulations, and agreements related to health, safety, and the environment. EM addresses this broad mandate through related and interdependent programs that include corrective actions, waste operations, environmental restoration, and technology development. The EM Office of Environmental Restoration (EM-40) recognizes the importance of implementing a complex-wide process to identify and resolve those issues that may impede progress towards site cleanup. As a first step in this process, FM-40 sponsored an exercise to identify and characterize major regulatory and institutional issues and to formulate integrated action steps towards their resolution. This report is the first product of that exercise. It is intended that the exercise described here will mark the beginning of an ongoing process of issue identification, tracking, and resolution that will benefit cleanup activities across the DOE complex.

  18. Technical framework for groundwater restoration

    1991-04-01

    This document provides the technical framework for groundwater restoration under Phase II of the Uranium Mill Tailings Remedial Action (UMTRA) Project. A preliminary management plan for Phase II has been set forth in a companion document titled ''Preplanning Guidance Document for Groundwater Restoration''. General principles of site characterization for groundwater restoration, restoration methods, and treatment are discussed in this document to provide an overview of standard technical approaches to groundwater restoration

  19. Use of phytoproductivity data in the choice of native plant species to restore a degraded coal mining site amended with a stabilized industrial organic sludge.

    Chiochetta, Claudete G; Toumi, Hela; Böhm, Renata F S; Engel, Fernanda; Poyer-Radetski, Gabriel; Rörig, Leonardo R; Adani, Fabrizio; Radetski, Claudemir M

    2017-11-01

    Coal mining-related activities result in a degraded landscape and sites associated with large amounts of dumped waste material. The arid soil resulting from acid mine drainage affects terrestrial and aquatic ecosystems, and thus, site remediation programs must be implemented to mitigate this sequential deleterious processes. A low-cost alternative material to counterbalance the affected physico-chemical-microbiological aspects of the degraded soil is the amendment with low contaminated and stabilized industrial organic sludge. The content of nutrients P and N, together with stabilized organic matter, makes this material an excellent fertilizer and soil conditioner, fostering biota colonization and succession in the degraded site. However, choice of native plant species to restore a degraded site must be guided by some minimal criteria, such as plant survival/adaptation and plant biomass productivity. Thus, in this 3-month study under environmental conditions, phytoproductivity tests with five native plant species (Surinam cherry Eugenia uniflora L., C. myrianthum-Citharexylum myrianthum, Inga-Inga spp., Brazilian peppertree Schinus terebinthifolius, and Sour cherry Prunus cerasus) were performed to assess these criteria, and additional biochemical parameters were measured in plant tissues (i.e., protein content and peroxidase activity) exposed to different soil/sludge mixture proportions. The results show that three native plants were more adequate to restore vegetation on degraded sites: Surinam cherry, C. myrianthum, and Brazilian peppertree. Thus, this study demonstrates that phytoproductivity tests associated with biochemical endpoint measurements can help in the choice of native plant species, as well as aiding in the choice of the most appropriate soil/stabilized sludge proportion in order to optimize biomass production.

  20. Streamlined approach for environmental restoration closure report for Corrective Action Unit 452: Historical underground storage tank release sites, Nevada Test Site, Nevada

    1998-04-01

    This report addresses the site characterization of three historical underground storage tank (UST) petroleum hydrocarbon release sites identified as 25-3101-1, 25-3102-3, and 25-3152-1. The sites are located within the Nevada Test Site in Area 25 at Buildings 3101, 3102, and 3152. The characterization was completed to support administrative closure of the sites. Characterization was completed using drilling equipment to delineate the extent of hydrocarbon impact. Clean closure had been previously attempted at each of these sites using backhoe equipment without success due to adjacent structures, buried utilities, or depth restrictions associated with each site. Although the depth and extent of hydrocarbon impact was determined to be too extensive for clean closure, it was verified through drilling that the sites should be closed through an administrative closure. The Nevada Administrative Code ''A Through K'' evaluation completed for each site supports that there is no significant risk to human health or the environment from the impacted soils remaining at each site

  1. Final disposal of spent fuel in the Finnish bedrock. Scope and requirements for site-specific safety analysis

    1996-12-01

    The report is a summary of the research conducted in the period 1993 to 1996 into safety of spent fuel final disposal. The principal goal of the research in this period, as set in 1993, was to develop a strategy for site-specific safety analysis. At the same time efforts were to be continued to gather data and validate the technical approach for the analysis. The work aimed at having the data needed for the analysis available at the end of year 1998. A safety assessment update, TILA-96, prepared by VTT Energy, is published as a separate report. The assessment is based on the TVO-92 safety analysis, but takes into account the knowledge acquired after 1992 on safety aspects of the disposal system and the data gathered from the site investigations made by TVO and from the beginning of 1996, by Posiva. Since the site investigations are still ongoing and much of the data gathered still pending interpretation, only limited amount of new site-specific information has been available for the present assessment. (172 refs.)

  2. Characterization of the Long-term Subsurface Warming Observed at the Apollo 15 and 17 Sites Utilizing the Newly Restored Heat Flow Experiment Data from 1975 to 1977

    Nagihara, S.; Kiefer, W. S.; Taylor, P. T.; Williams, D. R.; Nakamura, Y.; Krell, J. W.

    2017-12-01

    The Apollo Heat Flow Experiment (HFE) was conducted at landing sites 15 and 17 as part of the Apollo Lunar Surface Experiment Package (ALSEP) program. At each site, the astronauts drilled 2 holes, 10-m apart, and installed a probe in each. The probes monitored surface and subsurface temperatures. The Apollo 15 probes operated from July 1971 to January 1977. The Apollo 17 probes operated from December 1972 to September 1977. For both sites, only data from the beginning to December 1974 were archived previously. We have restored major portions of the 1975-1977 HFE data for both sites from two sets of sources recently recovered. One was the original ALSEP archival data tapes, from which raw HFE data were extracted and processed according to the procedure and the calibration data specified by the original investigators. The other was the ALSEP Performance Summary Reports, which included weekly logs of temperature readings from the deepest sensor of each of the probes. The original HFE investigators noted that temperature of the regolith well below the thermal skin depth ( 1 m) rose gradually through December 1974 at both sites. Possible causes of the warming have been debated since. The restored 1975-1977 HFE data allow more detailed characterization of this phenomenon, especially for the Apollo 17 site, for which the duration of data availability has more than doubled. For both sites, the subsurface warming continued till the end of observations. Simultaneously, thermal gradient decreased. Such behavior is consistent with one of the hypotheses proposed by the original investigators; temperature of the lunar surface around the probe increased by 2 to 4 K at the time of deployment. Consequently, the subsurface thermal regime gradually adjusted to the new boundary condition. The Lunar Reconnaissance Orbiter Camera images taken over the Apollo landing sites suggest that astronaut-induced surface disturbance resulted in lower albedo, and that should have raised average

  3. Efficacy of plastic mesh tubes in reducing herbivory damage by the invasive nutria (Myocastor coypus) in an urban restoration site

    Sheffels, Trevor R.; Systma, Mark D.; Carter, Jacoby; Taylor, Jimmy D.

    2014-01-01

    The restoration of stream corridors is becoming an increasingly important component of urban landscape planning, and the high cost of these projects necessitates the need to understand and address potential ecological obstacles to project success. The nutria(Myocastor coypus) is an invasive, semi-aquatic rodent native to South America that causes detrimental ecological impacts in riparian and wetland habitats throughout its introduced range, and techniques are needed to reduce nutria herbivory damage to urban stream restoration projects. We assessed the efficacy of standard Vexar® plastic mesh tubes in reducing nutria herbivory damage to newly established woody plants. The study was conducted in winter-spring 2009 at Delta Ponds, a 60-ha urban waterway in Eugene, Oregon. Woody plants protected by Vexar® tubes demonstrated 100% survival over the 3-month initial establishment period, while only 17% of unprotected plantings survived. Nutria demonstrated a preference for black cottonwood (Populus balsamifera ssp trichocarpa) over red osier dogwood (Cornussericea) and willow (Salix spp). Camera surveillance showed that nutria were more active in unprotected rather than protected treatments. Our results suggest that Vexar® plastic mesh tubing can be an effective short-term herbivory mitigation tool when habitat use by nutria is low. Additionally, planting functionally equivalent woody plant species that are less preferred by nutria, and other herbivores, may be another method for reducing herbivory and improving revegetation success. This study highlights the need to address potential wildlife damage conflicts in the planning process for stream restoration in urban landscapes.

  4. Mapping elevations of tidal wetland restoration sites in San Francisco Bay: Comparing accuracy of aerial lidar with a singlebeam echosounder

    Athearn, N.D.; Takekawa, John Y.; Jaffe, B.; Hattenbach, B.J.; Foxgrover, A.C.

    2010-01-01

    The southern edge of San Francisco Bay is surrounded by former salt evaporation ponds, where tidal flow has been restricted since the mid to late 1890s. These ponds are now the focus of a large wetland restoration project, and accurate measurement of current pond bathymetry and adjacent mud flats has been critical to restoration planning. Aerial light detection and ranging (lidar) has become a tool for mapping surface elevations, but its accuracy had rarely been assessed for wetland habitats. We used a singlebeam echosounder system we developed for surveying shallow wetlands to map submerged pond bathymetry in January of 2004 and compared those results with aerial lidar surveys in two ponds that were dry in May of 2004. From those data sets, we compared elevations for 5164 (Pond E9, 154 ha) and 2628 (Pond E14, 69 ha) echosounder and lidar points within a 0.375-m radius of each other (0.750-m diameter lidar spot size). We found that mean elevations of the lidar points were lower than the echosounder results by 5 ?? 0.1 cm in Pond E9 and 2 ?? 0.2 cm in Pond E14. Only a few points (5% in Pond E9, 2% in Pond E14) differed by more than 20 cm, and some of these values may be explained by residual water in the ponds during the lidar survey or elevation changes that occurred between surveys. Our results suggest that aerial lidar may be a very accurate and rapid way to assess terrain elevations for wetland restoration projects. ?? 2010 Coastal Education and Research Foundation.

  5. Additional disturbances as a beneficial tool for restoration of post-mining sites: a multi-taxa approach

    Řehounková, K.; Čížek, Lukáš; Řehounek, J.; Šebelíková, L.; Tropek, Robert; Lencová, K.; Bogusch, P.; Marhoul, P.; Máca, J.

    2016-01-01

    Roč. 23, č. 14 (2016), s. 13745-13753 ISSN 0944-1344 R&D Projects: GA ČR GAP504/12/2525 Grant - others:University of South Bohemia(CZ) 04-168/2013/P; University of Hradec Králové(CZ) SV2117/2014 Institutional support: RVO:60077344 Keywords : human-made habitats * restoration ecology * trampling management Subject RIV: EH - Ecology, Behaviour Impact factor: 2.741, year: 2016 http://link.springer.com/article/10.1007/s11356-016-6585-5

  6. Los Alamos National Laboratory Site Integrated Management plan, uranium 233 storage and disposition. Volume 1: Project scope and description

    Nielsen, J.B.; Erickson, R.

    1997-01-01

    This Site Integration Management plan provides the Los Alamos Response to the Defense Nuclear Facility Safety Board (DNFSB) Recommendation 97-1. This recommendation addresses the safe storage and management of the Departments uranium 233 ( 233 U) inventory. In the past, Los Alamos has used 233 U for a variety of different weapons related projects. The material was used at a variety of sites in varying quantities. Now, there is a limited need for this material and the emphasis has shifted from use to storage and disposition of the material. The Los Alamos program to address the DNFSB Recommendation 97-1 has two emphases. First, take corrective action to address near term deficiencies required to provide safe interim storage of 233 U. Second, provide a plan to address long term storage and disposition of excess inventory at Los Alamos

  7. Environmental restoration of uranium contaminated sites in Estonia within the framework of IAEA project (RER/9/022) in 1995-1996

    Ratas, R.

    1997-01-01

    In Estonia there are several radioactively contaminated sites left from the military and uranium progressing activities by the former Soviet Union. Enhanced radiation levels are prevalent in the Paldiski area, a former nuclear submarine training centre; on the territory of the waste depository at Saku/Tammiku and at Sillamae, where a large depository of uranium milling tailings is situated. During the last two years considerable effort has been put into restoration of these sites. To start with, designing of reasonably achievable remediation projects have been taken up. Estonia has received large contributions from many western countries and organisations. Practical remediation work on contaminated areas, e.g. at Sillamae is, however, delayed due to lack of funds. (author)

  8. Investigation of ground-water contamination at a drainage ditch, Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, 2005–06

    Vroblesky, Don A.; Casey, Clifton C.

    2007-01-01

    The U.S. Geological Survey, in cooperation with the Naval Facilities Engineering Command Southeast, used newly developed sampling methods to investigate ground-water contamination by chlorobenzenes beneath a drainage ditch on the southwestern side of Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, during 2005-06. The drainage ditch, which is a potential receptor for ground-water contaminants from Installation Restoration Site 4, intermittently discharges water to Corpus Christi Bay. This report uses data from a new type of pore-water sampler developed for this investigation and other methods to examine the subsurface contamination beneath the drainage ditch. Analysis of ground water from the samplers indicated that chlorobenzenes (maximum detected concentration of 160 micrograms per liter) are present in the ground water beneath the ditch. The concentrations of dissolved oxygen in the samples (less than 0.05-0.4 milligram per liter) showed that the ground water beneath and near the ditch is anaerobic, indicating that substantial chlorobenzene biodegradation in the aquifer beneath the ditch is unlikely. Probable alternative mechanisms of chlorobenzene removal in the ground water beneath the drainage ditch include sorption onto the organic-rich sediment and contaminant depletion by cattails through uptake, sorption, and localized soil aeration.

  9. Optimization of wetland restoration siting and zoning in flood retention areas of river basins in China: A case study in Mengwa, Huaihe River Basin

    Zhang, Xiaolei; Song, Yuqin

    2014-11-01

    Wetland restoration in floodplains is an ecological solution that can address basin-wide flooding issues and minimize flooding and damages to riverine and downstream areas. High population densities, large economic outputs, and heavy reliance on water resources make flood retention and management pressing issues in China. To balance flood control and sustainable development economically, socially, and politically, flood retention areas have been established to increase watershed flood storage capacities and enhance the public welfare for the populace living in the areas. However, conflicts between flood storage functions and human habitation appear irreconcilable. We developed a site-specific methodology for identifying potential sites and functional zones for wetland restoration in a flood retention area in middle and eastern China, optimizing the spatial distribution and functional zones to maximize flood control and human and regional development. This methodology was applied to Mengwa, one of 21 flood retention areas in China's Huaihe River Basin, using nine scenarios that reflected different flood, climatic, and hydraulic conditions. The results demonstrated improved flood retention and ecological functions, as well as increased economic benefits.

  10. Streamlined approach for environmental restoration closure report for Corrective Action Unit No. 456: Underground storage tank release site 23-111-1, Nevada Test Site, Nevada

    1998-04-01

    The underground storage tank (UST) release site 23-111-1 is located in Mercury, Nevada. The site is in Area 23 of the Nevada Test Site, (NTS) located on the north side of Building 111. The tank associated with the release was closed in place using cement grout on September 6, 1990. The tank was not closed by removal due to numerous active underground utilities, a high-voltage transformer pad, and overhead power lines. Soil samples collected below the tank bottom at the time of tank closure activities exceeded the Nevada Administrative Code Action Level of 100 milligrams per kilogram (mg/kg) for petroleum hydrocarbons. Maximum concentrations detected were 119 mg/kg. Two passive venting wells were subsequently installed at the tank ends to monitor the progress of biodegradation at the site. Quarterly air sampling from the wells was completed for approximately one year, but was discontinued since data indicated that considerable biodegradation was not occurring at the site

  11. Survival and growth of restored Piedmont riparian forests as affected by site preparation, planting stock, and planting aids

    Chelsea M. Curtis; W. Michael Aust; John R. Seiler; Brian D. Strahm

    2015-01-01

    Forest mitigation sites may have poor survival and growth of planted trees due to poor drainage, compacted soils, and lack of microtopography. The effects of five replications of five forestry mechanical site preparation techniques (Flat, Rip, Bed, Pit, and Mound), four regeneration sources (Direct seed, Bare root, Tubelings, and Gallon), and three planting aids (None...

  12. Streamlined approach for environmental restoration closure report for Corrective Action Unit 454: Historical underground storage tank release sites, Nevada Test Site, Nevada

    1998-04-01

    This report addresses the characterization of three historical underground storage tank (UST) petroleum hydrocarbon release sites identified as 12-B-1, 12-B-3, and 12-COMM-1. The sites are located within the Nevada Test Site in Area 12 at B Tunnel and a former Communications/Power Maintenance Shop. Release Site 12-B-1 was not able to be clean-closed as proposed in the SAFER Plan. However, hydrocarbon impacted soils were excavated down to bedrock. Release Site 12-B-3 was evaluated to verify that the identified release was not associated with the UST removed from the site. Analytical results support the assumption that wood or possibly a roof sealant used as part of the bunker construction could have been the source of hydrocarbons detected. Release Site 12-COMM-1 was not clean closed as proposed in the SAFER Plan. The vertical extent of impacted soils was determined not to extend below a depth of 2.7 m (9 ft) below ground surface (bgs). The lateral extent could not be defined due to the presence of a discontinuous lens of hydrocarbon-impacted soil

  13. Streamlined approach for environmental restoration closure report for Corrective Action Unit 454: Historical underground storage tank release sites, Nevada Test Site, Nevada

    NONE

    1998-04-01

    This report addresses the characterization of three historical underground storage tank (UST) petroleum hydrocarbon release sites identified as 12-B-1, 12-B-3, and 12-COMM-1. The sites are located within the Nevada Test Site in Area 12 at B Tunnel and a former Communications/Power Maintenance Shop. Release Site 12-B-1 was not able to be clean-closed as proposed in the SAFER Plan. However, hydrocarbon impacted soils were excavated down to bedrock. Release Site 12-B-3 was evaluated to verify that the identified release was not associated with the UST removed from the site. Analytical results support the assumption that wood or possibly a roof sealant used as part of the bunker construction could have been the source of hydrocarbons detected. Release Site 12-COMM-1 was not clean closed as proposed in the SAFER Plan. The vertical extent of impacted soils was determined not to extend below a depth of 2.7 m (9 ft) below ground surface (bgs). The lateral extent could not be defined due to the presence of a discontinuous lens of hydrocarbon-impacted soil.

  14. INL Site Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Mamagement Programmatic Final Environmental Impact Statement

    N/A

    2005-06-30

    In April 1995, the Department of Energy (DOE) and the Department of the Navy, as a cooperating agency, issued the Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement (1995 EIS). The 1995 EIS analyzed alternatives for managing The Department's existing and reasonably foreseeable inventories of spent nuclear fuel through the year 2035. It also included a detailed analysis of environmental restoration and waste management activities at the Idaho National Engineering and Environmental Laboratory (INEEL). The analysis supported facility-specific decisions regarding new, continued, or planned environmental restoration and waste management operations. The Record of Decision (ROD) was signed in June 1995 and amended in February 1996. It documented a number of projects or activities that would be implemented as a result of decisions regarding INL Site operations. In addition to the decisions that were made, decisions on a number of projects were deferred or projects have been canceled. DOE National Environmental Policy Act (NEPA) implementing procedures (found in 10 CFR Part 1 021.330(d)) require that a Supplement Analysis of site-wide EISs be done every five years to determine whether the site-wide EIS remains adequate. While the 1995 EIS was not a true site-wide EIS in that several programs were not included, most notably reactor operations, this method was used to evaluate the adequacy of the 1995 EIS. The decision to perform a Supplement Analysis was supported by the multi-program aspect of the 1995 EIS in conjunction with the spirit of the requirement for periodic review. The purpose of the SA is to determine if there have been changes in the basis upon which an EIS was prepared. This provides input for an evaluation of the continued adequacy of the EIS in light of those changes (i.e., whether there are substantial changes in the proposed

  15. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  16. Site characterization report for Building 3515 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    1994-08-01

    Building 3515 at Oak Ridge National Laboratory (ORNL), also known as the Fission Product Pilot Plant, is a surplus facility in the main plant area to the east of the South Tank Farm slated for decontamination and decommissioning (D ampersand D). The building consists of two concrete cells (north and south) on a concrete pad and was used to extract radioisotopes of ruthenium, strontium, cesium, cerium, rhenium and other elements from aqueous fission product waste. Site characterization activities of the building were initiated. The objective of the site characterization was to provide information necessary for engineering evaluation and planning of D ampersand D approaches, planning for personal protection of D ampersand D workers, and estimating waste volumes from D ampersand D activities. This site characterization report documents the investigation with a site description, a summary of characterization methods, chemical and radiological sample analysis results, field measurement results, and waste volume estimates

  17. The Nizhegorodsky Kremlin Armory, a Cultural Heritage Site of Federal Significance. Restoration and Adjustment for the Volgo-Vyatsky Branch of the State Center of Modern Art (2004-2014

    Anna Gor

    2016-10-01

    Full Text Available The article observes the peculiarities of the realized restoration of the Nizhegorodsky Kremlin Armory, a cultural heritage site of federal significance. The restoration concept was based on the principles of scientificity and authenticity. Its purpose was to retain the parameters and historical look of the Armory, as well as its aesthetic and historical value as much as possible, causing the least interference in the historical material of the site. The article demonstrates the appropriateness of restoration and all design decisions, which made it possible to reveal the historical and cultural value of the site, to improve its maintenance, to provide conditions for modern use of the building, and to make the cultural heritage site available to the public.

  18. Gulf Coast geopressured-geothermal program summary report compilation. Volume 2-B: Resource description, program history, wells tested, university and company based research, site restoration

    John, C.J.; Maciasz, G.; Harder, B.J.

    1998-06-01

    The US Department of Energy established a geopressured-geothermal energy program in the mid 1970`s as one response to America`s need to develop alternate energy resources in view of the increasing dependence on imported fossil fuel energy. This program continued for 17 years and approximately two hundred million dollars were expended for various types of research and well testing to thoroughly investigate this alternative energy source. This volume describes the following studies: Design well program; LaFourche Crossing; MG-T/DOE Amoco Fee No. 1 (Sweet Lake); Environmental monitoring at Sweet Lake; Air quality; Water quality; Microseismic monitoring; Subsidence; Dow/DOE L.R. Sweezy No. 1 well; Reservoir testing; Environmental monitoring at Parcperdue; Air monitoring; Water runoff; Groundwater; Microseismic events; Subsidence; Environmental consideration at site; Gladys McCall No. 1 well; Test results of Gladys McCall; Hydrocarbons in production gas and brine; Environmental monitoring at the Gladys McCall site; Pleasant Bayou No. 2 well; Pleasant Bayou hybrid power system; Environmental monitoring at Pleasant Bayou; and Plug abandonment and well site restoration of three geopressured-geothermal test sites. 197 figs., 64 tabs.

  19. Streamlined approach for environmental restoration work plan for Corrective Action Unit 126: Closure of aboveground storage tanks, Nevada Test Site, Nevada. Revision 1

    1998-07-01

    This plan addresses the closure of several aboveground storage tanks in Area 25 of the Nevada Test Site. The unit is currently identified as Corrective Action Unit 126 in the Federal Facility Agreement and Consent Order and is listed as having six Corrective Action Sites. This plan addresses the Streamlined Approach for Environmental Restoration closure for five of the six sites. Four of the CASs are located at the Engine Test Stand complex and one is located in the Central Support Area. The sites consist of aboveground tanks, two of which were used to store diesel fuel and one stored Nalcool (an antifreeze mixture). The remaining tanks were used as part of a water demineralization process and stored either sulfuric acid or sodium hydroxide, and one was used as a charcoal adsorption furnace. Closure will be completed by removal of the associated piping, tank supports and tanks using a front end loader, backhoe, and/or crane. When possible, the tanks will be salvaged as scrap metal. The piping that is not removed will be sealed using a cement grout

  20. Phytophthora cinnamomi Colonized Reclaimed Surface Mined Sites in Eastern Kentucky: Implications for the Restoration of Susceptible Species

    Kenton L. Sena

    2018-04-01

    Full Text Available Appalachian forests are threatened by a number of factors, especially introduced pests and pathogens. Among these is Phytophthora cinnamomi, a soil-borne oomycete pathogen known to cause root rot in American chestnut, shortleaf pine, and other native tree species. This study was initiated to characterize the incidence of P. cinnamomi on surface mined lands in eastern Kentucky, USA, representing a range of time since reclamation (10, 12, 15, and 20 years since reclamation. Incidence of P. cinnamomi was correlated to soil properties including overall soil development, as indicated by a variety of measured soil physical and chemical parameters, especially the accumulation of soil organic carbon. P. cinnamomi was detected in only two of the four sites studied, aged 15 and 20 years since reclamation. These sites were generally characterized by higher organic matter accumulation than the younger sites in which P. cinnamomi was not detected. These results demonstrate that P. cinnamomi is capable of colonizing reclaimed mine sites in Appalachia; additional research is necessary to determine the impact of P. cinnamomi on susceptible tree species at these sites.

  1. The role of the California Base Closure Environmental Committee's (CBCEC) Radioactive and Mixed Waste Process Action Team (RMWPAT) in expediting site restoration and reuse

    Laudon, L.S.

    1994-01-01

    The Base Realignment and Closure Act (BRAC) mandated the closing and transfer of Department of Defense (DoD) properties within specific timeframes. Due to requirements of federal and state laws, closing bases must be environmentally remediated to alleviate threats to human health and the environment upon transfer. Certain barriers such as legislative, regulatory, administrative, and technical issues, have been identified which threaten the timely restoration and transfer of these BRAC properties. The state of California, faced with the scheduled closure or realignment of 26 military bases, recognized the need to establish a base closure environmental committee to address issues affecting the timely cleanup and reuse of DoD properties and promote accelerated restoration. Accordingly, the California Base Closure Environmental Committee (CBCEC) was formed by executive order of Governor Pete Wilson. One of the barriers identified by the CBCEC is the potential contamination of DoD facilities with radioactive materials. As a result of the difficulties encountered in assessing the nature and extent of radioactive contamination at DoD sites in California, the CBCEC formed the Radioactive and Mixed Waste Process Action Team (RMWPAT). The RMWPAT was tasked with ''demystifying'' and working to address issues associated with radioactive contamination

  2. Real-time environmental radiation monitoring system with automatic restoration of backup data in site detector via communication using radio frequency

    Lee, Wan No; Kim, Eun Han; Chung, Kun Ho; Cho, Young Hyun; Choi, Geun Sik; Lee, Chang Woo; Park, Ki Hyun; Kim, Yun Goo

    2003-01-01

    An environmental radiation monitoring system based on high pressurized ionization chamber has been used for on-line gamma monitoring surrounding the KAERI (Korea Atomic Energy Research Institute), which transmits the dose data measured from ion chamber on the site via radio frequency to a central processing computer and stores the transmitted real-time data. Although communication using ratio frequency has several advantages such as effective and economical transmission, storage, and data process, there is one main disadvantage that data loss during transmission often happens because of unexpected communication problems. It is possible to restore the loss data by off-line such as floppy disk but the simultaneous process and display of current data as well as the backup data are very difficult in the present on-line system. In this work, a new electronic circuit board and the operation software applicable to the conventional environmental radiation monitoring system are developed and the automatical synchronization of the ion chamber unit and the central processing computer is carried out every day. This system is automatically able to restore the backup data within 34 hours without additional equipment and also display together the current data as well as the transmitted backup data after checking time flag

  3. Design cost scoping studies. Nevada Test Site Terminal Waste Storage Program, Subtask 1.3: facility hardening studies

    Yanev, P.I.; Owen, G.N.

    1978-04-01

    As part of a program being conducted by the U.S. Department of Energy, Nevada Operations Office, to determine the feasibility of establishing a terminal waste storage repository at the Nevada Test Site, URS/John A. Blume and Associates, Engineers, made approximate determinations of the additional costs required to provide protection of structures against seismic forces. A preliminary estimate is presented of the added costs required to harden the surface structures, underground tunnels and storage rooms, and vertical shafts of the repository against ground motion caused by earthquakes and underground nuclear explosions (UNEs). The conceptual design of all of the structures was adapted from proposed bedded-salt waste-isolation repositories. Added costs for hardening were calculated for repositories in three candidate geological materials (Eleana argillite, Climax Stock granite, and Jackass Flats tuff) for several assumed peak ground accelerations caused by earthquakes (0.3g, 0.5g, and 0.7g) and by UNEs (0.5g, 0.7g, and 1.0g). Hardening procedures to protect the tunnels, storage rooms, and shafts against incremental seismic loadings were developed from (1) qualitative considerations of analytically determined seismic stresses and (2) engineering evaluations of the dynamic response of the rock mass and the tunnel support systems. The added costs for seismic hardening of the surface structures were found to be less than 1% of the estimated construction cost of the surface structures. For the underground structures, essentially no hardening was required for peak ground accelerations up to 0.3g; however, added costs became significant at 0.5g, with a possible increase in structural costs for the underground facilities of as much as 35% at 1.0g

  4. From loblolly to longleaf: fifth-year results of a longleaf pine restoration study at two ecologically distinct sites

    Benjamin O. Knapp; G. Geoff Wang; Joan L. Walker; Huifeng Hu

    2015-01-01

    Historical land-use and management practices in the southeastern United States have resulted in the widespread conversion of many upland sites from dominance of longleaf pine (Pinus palustris Mill.) to loblolly pine (P. taeda L.) in the time following European settlement. Given the ecological, economic, and cultural...

  5. Development of floristic diversity in 10-year-old restoration forests on a bauxite mined site in Amazonia.

    J. A. Parrotta; O. H. Knowles; J.M. Wunderle Jr.

    1997-01-01

    Patterns of plant and animal diversity were studied in a 10-year-old native species reforestation area at a bauxite-mined site at porto Trombetas in western Para State, Brazil. Understorey and overstorey floristic composition and structure, understorey light conditions, forest floor development and soil properties were evaluated in a total of 38 78.5-m2

  6. Site investigation report for Waste Area Grouping 4 at Oak Ridge National Laboratory. Volume 1, Text: Environmental Restoration Program

    1995-08-01

    Waste Area Grouping (WAG) 4 is one of 17 WAGs within and associated with Oak Ridge National Laboratory (ORNL). WAG 4 is located south of the main facility along Lagoon Road. WAG 4 consists of three separate areas: Solid Waste Storage Area (SWSA) 4, a shallow-land-burial ground containing radioactive and potentially hazardous wastes; an experimental Pilot Pit Area, which includes a pilot-scale testing pit; and sections of two abandoned underground pipelines used for transporting liquid, low-level, radioactive waste. SWSA 4 is the largest site at WAG 4, covering approximately 23 acres. In the 1950s, SWSA 4 received a variety of low- and high-activity wastes, including transuranic wastes, all buried in trenches and auger holes. Recent surface water data, collected during monitoring of the tributary to White Oak Creek as part of WAG 2 investigations as well as during previous studies conducted at WAG 4, indicate that a significant amount of 90 Sr is being released from the old burial trenches in SWSA 4. This release represents a significant portion of the ORNL off-site risk (DOE 1993). With recent corrective measures the proportion of the release has increased in 1995. A detailed discussion of the site history and previous investigations is presented in the WAG 4 Preliminary Assessment Report, ORNL/ER-271 (Energy Systems 1994b). In an effort to control the sources of the 90 Sr release and to reduce the off-site risk, a site investigation was initiated to pinpoint those trenches that are the most prominent 90 Sr sources

  7. Fixation method does not affect restoration of rotation center in hip replacements: A single-site retrospective study

    Wegner Alexander

    2012-06-01

    Full Text Available Abstract Background Aseptic loosening is one of the greatest problems in hip replacement surgery. The rotation center of the hip is believed to influence the longevity of fixation. The aim of this study was to compare the influence of cemented and cementless cup fixation techniques on the position of the center of rotation because cemented cup fixation requires the removal of more bone for solid fixation than the cementless technique. Methods We retrospectively compared pre- and post-operative positions of the hip rotation center in 25 and 68 patients who underwent artificial hip replacements in our department in 2007 using cemented or cementless cup fixation, respectively, with digital radiographic image analysis. Results The mean horizontal and vertical distances between the rotation center and the acetabular teardrop were compared in radiographic images taken pre- and post-operatively. The mean horizontal difference was −2.63 mm (range: -11.00 mm to 10.46 mm, standard deviation 4.23 mm for patients who underwent cementless fixation, and −2.84 mm (range: -10.87 to 5.30 mm, standard deviation 4.59 mm for patients who underwent cemented fixation. The mean vertical difference was 0.60 mm (range: -20.15 mm to 10.00 mm, standard deviation 3.93 mm and 0.41 mm (range: -9.26 mm to 6.54 mm, standard deviation 3.58 mm for the cementless and cemented fixation groups, respectively. The two fixation techniques had no significant difference on the position of the hip rotation center in the 93 patients in this study. Conclusions The hip rotation center was similarly restored using either the cemented or cementless fixation techniques in this patient cohort, indicating that the fixation technique itself does not interfere with the position of the center of rotation. To completely answer this question further studies with more patients are needed.

  8. An Evaluation of the Effectiveness of Local Site-Specific Advisory Boards for US Department of Energy Environmental Restoration Programs

    Bradbury, J.A.; Branch, K.M.

    1999-03-12

    In the early 1990s, the US Department of Energy (DOE) undertook a major new effort to involve community stakeholders in decisions that would affect them and their communities and interests. An important component of this effort was the establishment of local Site-Specific Advisory Boards (SSABs) at 12 DOE environmental remediation sites. These boards were a formal representation of a change in the way DOE conducts its missions, adding consideration of community concerns and values to the Department's decision-making processes. DOE's purpose in creating the SSAB Initiative was to obtain broadly based, independent, consensus advice and recommendations on issues that have the potential to affect communities surrounding DOE sites, so that it could formulate policies that could be implemented with community consent. Because the boards represented a significant commitment by DOE to change its relationships with community stakeholders, the Department has conducted several assessments of the boards. In 1996 and 1997 a survey was administered to board members and others involved in the work of the boards (DOE/EM 0311, 1996; DOE/EM, 1997). As part of the first survey, DOE and the boards established a set of performance criteria. The surveys provided data that revealed wide variations in board performance and significant change over time. To gain a better understanding of the factors affecting board performance, DOE initiated a more in-depth, qualitative study of nine of the boards across the complex. This study focused on identifying and analyzing the factors affecting board performance and presenting that information in a format that helped the boards and DOE gain insight into their strengths and weaknesses and learn from one another. This report presents the results of this in-depth study. It begins with an overview report that identifies and discusses the six factors that were found to affect board performance. The overview report provides the framework and

  9. Joint inversion of geophysical data for site characterization and restoration monitoring. FY97 annual progress report for EMSP

    Berge, P.A.; Berryman, J.G.; Bonner, B.P.; Roberts, J.J.; Wildenschild

    1997-01-01

    'The purpose of this project is to develop a computer code for joint in-version of seismic and electrical data, to improve underground imaging for site characterization and remediation monitoring. The computer code developed in this project will invert geophysical data to obtain direct estimates of porosity and saturation underground, rather than inverting for seismic velocity and electrical resistivity or other geophysical properties. This is intended to be a significant improvement in the state-of-the-art of under-ground imaging, since interpretation of data collected at a contaminated site would become much less subjective. The schedule of this project is as follows: In the first year, investigators perform laboratory measurements of elastic and electrical properties of sand-clay mixtures containing various fluids. Investigators also develop methods of relating measurable geophysical properties to porosity and saturation by using rock physics theories, geostatistical, and empirical techniques together with available laboratory measurements. In the second year, investigators finish any necessary laboratory measurements and apply the methods developed in the first year to invert available borehole log data to predict measured properties of cores and sediments from a borehole. Investigators refine the inversion code in the third year and carry out a field experiment to collect seismic and electrical data. Investigators then use the inversion code to invert the field data to produce estimates of porosity and saturation in the field area where the data were collected. This report describes progress made in the first year of this three-year project.'

  10. Scope Definition

    Bjørn, Anders; Owsianiak, Mikołaj; Laurent, Alexis

    2018-01-01

    The scope definition is the second phase of an LCA. It determines what product systems are to be assessed and how this assessment should take place. This chapter teaches how to perform a scope definition. First, important terminology and key concepts of LCA are introduced. Then, the nine items...... making up a scope definition are elaborately explained: (1) Deliverables. (2) Object of assessment, (3) LCI modelling framework and handling of multifunctional processes, (4) System boundaries and completeness requirements, (5) Representativeness of LCI data, (6) Preparing the basis for the impact...... assessment, (7) Special requirements for system comparisons, (8) Critical review needs and (9) Planning reporting of results. The instructions relate both to the performance and reporting of a scope definition and are largely based on ILCD....

  11. Environmental Modeling, The Natural Filter Wetland Priority layers identify priority wetland restoration sites by subwatershed. Land use, hydrology, soil, and landscape characteristics were analyzed to rank opportunities with high nutrient removal potential., Published in 2014, Smaller than 1:100000 scale, Maryland Department of Natural Resources (DNR).

    NSGIC Education | GIS Inventory — Environmental Modeling dataset current as of 2014. The Natural Filter Wetland Priority layers identify priority wetland restoration sites by subwatershed. Land use,...

  12. Site characterization report for Building 3506 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    1994-07-01

    Building 3506, also known as the Waste Evaporator Facility, is a surplus facility at Oak Ridge National Laboratory (ORNL) slated for decontamination and decommissioning (D&D). The building is located in the ORNL main plant area, to the west of the South Tank Farm and near the intersection of Central Avenue and Third Street. Characterization tasks consisted of three main activities: inspections, radiological measurements, and radiological and chemical sampling and analysis. Inspection reports document general facility conditions, as-built information, and specialized information such as structural evaluations. Radiological measurements define the quantity and distribution of radioactive contaminants; this information is used to calibrate a dose model of the facility and estimate the total activity, in curies, of each major radioactive isotope. The radiological information from sample analyses is used to refine the radiological model of the facility, and the radionuclide and hazardous chemical analyses are used for waste management planning. This report presents data from the field investigation and laboratory analyses in the form of a site description, as-built drawings, summary tables of radiological and chemical contaminant concentrations, and a waste volume estimate.

  13. Site characterization report for Building 3506 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    1994-07-01

    Building 3506, also known as the Waste Evaporator Facility, is a surplus facility at Oak Ridge National Laboratory (ORNL) slated for decontamination and decommissioning (D ampersand D). The building is located in the ORNL main plant area, to the west of the South Tank Farm and near the intersection of Central Avenue and Third Street. Characterization tasks consisted of three main activities: inspections, radiological measurements, and radiological and chemical sampling and analysis. Inspection reports document general facility conditions, as-built information, and specialized information such as structural evaluations. Radiological measurements define the quantity and distribution of radioactive contaminants; this information is used to calibrate a dose model of the facility and estimate the total activity, in curies, of each major radioactive isotope. The radiological information from sample analyses is used to refine the radiological model of the facility, and the radionuclide and hazardous chemical analyses are used for waste management planning. This report presents data from the field investigation and laboratory analyses in the form of a site description, as-built drawings, summary tables of radiological and chemical contaminant concentrations, and a waste volume estimate

  14. Methodological improvement and extension of scope of the guide to the radiological examination and evaluation of contaminated former mining sites. Final report

    2005-01-01

    G.E.O.S. Freiberg Ingenieurgesellschaft mbH have been requested in a letter from the Federal Radiation Protection Office dated 15 September 2006 - AG 3.1 StSch - to submit a quote on the topic of ''Methodological improvement and extension of scope of the guide to the radiological examination and evaluation of contaminated former mining sites''. In response to this request Part A of this guide is to be extended by a section on microbiology or, more specifically, on processes in tailings and sedimentation plants that could be induced by microorganisms. Up until now the guide only considered chemical and geochemical processes in the modelling and evaluation of the release of radionuclides from tailings. However, in view of the possibility of microbiological processes occurring in tailings, as for example in the presence of pyrite, one must also reckon with microbiological influences on radionuclide release. the following tasks and problems will therefore be addressed: Do the recommendations given in the guide also apply if microbiological influences are considered? Is it also necessary to consider microbiological issues in the examination and modelling of radionuclide transport via groundwater? What parameters need to be measured and assessed if decisions on rehabilitation measures for tailings must also be based on microbiological aspects? Which examination methods should be used to measure the required parameters efficiently and reliably? Is there anything particular that needs to be considered in studying the involvement of microbiological processes in the release of radionuclides from industrial sedimentation plants? The recommendations given in the guide with respect to the treatment of the water pathway should be reviewed with regard to any amendments or supplementations they might require from the microbiological viewpoint. It should also be investigated whether microbiological studies and measurements are required for the guide's further development. The

  15. Methodology for ranking restoration options

    Jensen, Per Hedemann

    1999-01-01

    techniques as a function of contamination and site characteristics. The project includes analyses of existing remediation methodologies and contaminated sites, and is structured in the following steps:-characterisation of relevant contaminated sites -identication and characterisation of relevant restoration...... techniques -assessment of the radiological impact -development and application of a selection methodology for restoration options -formulation ofgeneric conclusions and development of a manual The project is intended to apply to situations in which sites with nuclear installations have been contaminated...

  16. Site investigation report for Waste Area Grouping 4 at Oak Ridge National Laboratory. Volume 2, Appendixes: Environmental Restoration Program

    1995-08-01

    This report documents the UltraSonic Ranging and Data Systems (USRADS) survey conducted for radiological characterization of approximately 5 acres located at the Oak Ridge National Laboratory (ORNL) Waste Area Grouping (WAG) 4. The survey was conducted by Chemrad Tennessee Corporation under subcontract No. 7908-RS-00902 to CDM Federal Programs Corporation. The field survey began June 23, 1994 (Chemrad survey team was unable to actually enter field until June 24 awaiting sign-off of CDM plans by MMES) and was terminated on June 29, 1994. The designated survey area is located on the DOE X-10 facility and South of the main X-10 building complex. The entire north boundary of the site is adjacent to SWSA 4, with the Bath Tubbing Trench Seep Area (BTT) actually being a part of that SWSA (See Figure 1). Approximately one-third of the designated area was actually surveyed. The BTT area slopes moderately eastward toward a small stream in the WAG 4 area. The area is open and had recently been trimmed for the survey. The balance of the designated survey area lies along the small stream within WAG 4 and is densely wooded with heavy underbrush. The area had not been cleared or brushed. Survey reference points for the BTT area mere directly tied into the X-10 coordinate system while the t bale,ice of the designated survey area mere tied into an existing relative metric grid system. The designated area was surveyed for radiological characterization using near-surface gamma and beta detectors as well as an energy independent dosimeter. This report describes the survey method and presents the survey findings

  17. Site investigation report for Waste Area Grouping 4 at Oak Ridge National Laboratory. Volume 2, Appendixes: Environmental Restoration Program

    NONE

    1995-08-01

    This report documents the UltraSonic Ranging and Data Systems (USRADS) survey conducted for radiological characterization of approximately 5 acres located at the Oak Ridge National Laboratory (ORNL) Waste Area Grouping (WAG) 4. The survey was conducted by Chemrad Tennessee Corporation under subcontract No. 7908-RS-00902 to CDM Federal Programs Corporation. The field survey began June 23, 1994 (Chemrad survey team was unable to actually enter field until June 24 awaiting sign-off of CDM plans by MMES) and was terminated on June 29, 1994. The designated survey area is located on the DOE X-10 facility and South of the main X-10 building complex. The entire north boundary of the site is adjacent to SWSA 4, with the Bath Tubbing Trench Seep Area (BTT) actually being a part of that SWSA (See Figure 1). Approximately one-third of the designated area was actually surveyed. The BTT area slopes moderately eastward toward a small stream in the WAG 4 area. The area is open and had recently been trimmed for the survey. The balance of the designated survey area lies along the small stream within WAG 4 and is densely wooded with heavy underbrush. The area had not been cleared or brushed. Survey reference points for the BTT area mere directly tied into the X-10 coordinate system while the t bale,ice of the designated survey area mere tied into an existing relative metric grid system. The designated area was surveyed for radiological characterization using near-surface gamma and beta detectors as well as an energy independent dosimeter. This report describes the survey method and presents the survey findings.

  18. Mutations within Four Distinct Gag Proteins Are Required To Restore Replication of Human Immunodeficiency Virus Type 1 after Deletion Mutagenesis within the Dimerization Initiation Site

    Liang, Chen; Rong, Liwei; Quan, Yudong; Laughrea, Michael; Kleiman, Lawrence; Wainberg, Mark A.

    1999-01-01

    Human immunodeficiency virus type 1 (HIV-1) genomic RNA segments at nucleotide (nt) positions +240 to +274 are thought to form a stem-loop secondary structure, termed SL1, that serves as a dimerization initiation site for viral genomic RNA. We have generated two distinct deletion mutations within this region, termed BH10-LD3 and BH10-LD4, involving nt positions +238 to +253 and +261 to +274, respectively, and have shown that each of these resulted in significant diminutions in levels of viral infectiousness. However, long-term culture of each of these viruses in MT-2 cells resulted in a restoration of infectiousness, due to a series of compensatory point mutations within four distinct proteins that are normally cleaved from the Gag precursor. In the case of BH10-LD3, these four mutations were MA1, CA1, MP2, and MNC, and they involved changes of amino acid Val-35 to Ile within the matrix protein (MA), Ile-91 to Thr within the capsid (CA), Thr-12 to Ile within p2, and Thr-24 to Ile within the nucleocapsid (NC). The order in which these mutations were acquired by the mutated BH10-LD3 was MNC > CA1 > MP2 > MA1. The results of site-directed mutagenesis studies confirmed that each of these four substitutions contributed to the increased viability of the mutated BH10-LD3 viruses and that the MNC substitution, which was acquired first, played the most important role in this regard. Three point mutations, MP2, MNC, and MA2, were also shown to be sequentially acquired by viruses that had emerged in culture from the BH10-LD4 deletion. The first two of these were identical to those described above, while the last involved a change of Val-35 to Leu. All three of these substitutions were necessary to restore the infectiousness of mutated BH10-LD4 viruses to wild-type levels, although the MP2 mutation alone, but neither of the other two substitutions, was able to confer some viability on BH10-LD4 viruses. Studies of viral RNA packaging showed that the BH10-LD4 deletion only

  19. Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project: FY 1994--FY 2001

    1993-12-01

    This Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project. FY 1994--FY 2001 is the third in a series of documents that report current estimates of the waste volumes expected to be generated as a result of Environmental Restoration activities at Department of Energy, Oak Ridge Operations Office (DOE-ORO), sites. Considered in the scope of this document are volumes of waste expected to be generated as a result of remedial action and decontamination and decommissioning activities taking place at these sites. Sites contributing to the total estimates make up the DOE-ORO Environmental Restoration OR-1 Project: the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Y-12 Plant, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and the off-site contaminated areas adjacent to the Oak Ridge facilities (collectively referred to as the Oak Ridge Reservation Off-Site area). Estimates are available for the entire fife of all waste generating activities. This document summarizes waste estimates forecasted for the 8-year period of FY 1994-FY 2001. Updates with varying degrees of change are expected throughout the refinement of restoration strategies currently in progress at each of the sites. Waste forecast data are relatively fluid, and this document represents remediation plans only as reported through September 1993

  20. Radiation protection of the workers, public and the environment during / after uranium site restoration and clean-up of additional contaminated areas

    Aurelian, F.; Georgescu, D.; Popescu, M.

    2006-01-01

    Full text of publication follows: Beginning with 1950 the uranium mining industry was developed in Romania. Banat region was one of the most important metallogenic zones of the country and its exploitation began on 1962. Between 1988 and 1998 uranium exploitation activity was ceased due to the uranium ore deposits exhaustion. Therefore, between 2000 and 2004 the entire mining zone closure, ecological rehabilitation and decommissioning documentation was conceived. The proposed solutions were elaborated according to the Romanian Environmental and Nuclear Authority concerning the terrain, equipment, devices and buildings unrestricted utilization after the mining site decommissioning and ecological rehabilitation. The radioactive sources (dumps, contaminated soil, and mining waters), radioactive pollution spreading pathways and the affected target groups were identified based on the research studies carried out in order to elaborate the mining area closure, decommissioning and ecological rehabilitation technical project. The closured mining zone map with these elements positions and their radioactive potential, namely the uranium and radium content, gamma radiation and radon concentration is presented. The present paper shows the assessment of the supplementary effective doses received by the population from the critical groups, which are calculated for the following three distinct situations: a) at the moment of uranium ore exploitation activity closure; b) during the closure, decommissioning and rehabilitation workings time; c) after the site rehabilitation and remediation. Each moment is characterized by a map, which presents the radioactivity levels discussed for four distinct scenarios. Each one of these scenarios is characterized and justified for its chosen. For each one of the scenarios there are presented maps with the pollution sources and pathways and there are calculated the public supplementary effective doses before and after site restoration. During the

  1. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada, Rev. No. 0

    Boehlecke, Robert F.

    2006-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site (NTS), Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]); (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk; (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Department of Environmental Protection (NDEP), where the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) will reach consensus with the NDEP before beginning the next phase of work. Corrective Action Unit 553 is located in Areas 19 and 20 of the NTS, approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 553 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: 19-99-01, Mud Spill; 19-99-11, Mud Spill; 20-09-09, Mud Spill; and 20-99-03, Mud Spill. There is sufficient information and process

  2. Adaptively Addressing Uncertainty in Estuarine and Near Coastal Restoration Projects

    Thom, Ronald M.; Williams, Greg D.; Borde, Amy B.; Southard, John A.; Sargeant, Susan L.; Woodruff, Dana L.; Laufle, Jeffrey C.; Glasoe, Stuart

    2005-03-01

    Restoration projects have an uncertain outcome because of a lack of information about current site conditions, historical disturbance levels, effects of landscape alterations on site development, unpredictable trajectories or patterns of ecosystem structural development, and many other factors. A poor understanding of the factors that control the development and dynamics of a system, such as hydrology, salinity, wave energies, can also lead to an unintended outcome. Finally, lack of experience in restoring certain types of systems (e.g., rare or very fragile habitats) or systems in highly modified situations (e.g., highly urbanized estuaries) makes project outcomes uncertain. Because of these uncertainties, project costs can rise dramatically in an attempt to come closer to project goals. All of the potential sources of error can be addressed to a certain degree through adaptive management. The first step is admitting that these uncertainties can exist, and addressing as many of the uncertainties with planning and directed research prior to implementing the project. The second step is to evaluate uncertainties through hypothesis-driven experiments during project implementation. The third step is to use the monitoring program to evaluate and adjust the project as needed to improve the probability of the project to reach is goal. The fourth and final step is to use the information gained in the project to improve future projects. A framework that includes a clear goal statement, a conceptual model, and an evaluation framework can help in this adaptive restoration process. Projects and programs vary in their application of adaptive management in restoration, and it is very difficult to be highly prescriptive in applying adaptive management to projects that necessarily vary widely in scope, goal, ecosystem characteristics, and uncertainties. Very large ecosystem restoration programs in the Mississippi River delta (Coastal Wetlands Planning, Protection, and Restoration

  3. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, with ROTC 1, Revision 0

    Patrick Matthews

    2011-11-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 465, Hydronuclear, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 465 comprises the following four corrective action sites (CASs) located in Areas 6 and 27 of the Nevada National Security Site: (1) 00-23-01, Hydronuclear Experiment; (2) 00-23-02, Hydronuclear Experiment; (3) 00-23-03, Hydronuclear Experiment; (4) 06-99-01, Hydronuclear. The sites will be investigated based on the data quality objectives (DQOs) developed on July 6, 2011, by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 465. For CAU 465, two potential release components have been identified. The subsurface release component includes potential releases of radiological and nonradiological contaminants from the subsurface hydronuclear experiments and disposal boreholes. The surface release component consists of other potential releases of radiological and nonradiological contaminants to surface soils that may have occurred during the pre- and post-test activities. This plan provides the methodology for collection of the necessary information for closing each CAS component. There is sufficient information and process knowledge from historical documentation, contaminant characteristics, existing regional and site groundwater models, and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 465 using the SAFER process. For potential subsurface releases, flow and transport models will be developed to integrate existing data into a conservative

  4. Ecological Restoration: Guidance from Theory

    Joy Zedler

    2005-09-01

    Full Text Available A review of the science and practice of ecosystem restoration led me to identify key ecological theories and concepts that are relevant to planning, implementing, and sustaining restoration efforts. From experience with actual restoration projects, I provide guidance for improving the restoration process. Despite an abundance of theory and guidance, restoration goals are not always achieved, and pathways toward targets are not highly predictable. This is understandable, since each restoration project has many constraints and unique challenges. To improve restoration progress, I advise that sites be designed as experiments to allow learning while doing. At least the larger projects can be restored in phases, each designed as experimental treatments to test alternative restoration approaches. Subsequent phases can then adopt one or more of the treatments that best achieved goals in earlier phases while applying new tests of other restoration measures. Both science and restoration can progress simultaneously. This phased, experimental approach (called “adaptive restoration” is an effective tool for improving restoration when monitoring, assessment, interpretation and research are integrated into the process.

  5. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Area 25 and Area 26 Railroad Tracks, Nevada Test Site, Nevada, Revision 0

    Mark Krauss

    2010-06-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 539, Areas 25 and 26 Railroad Tracks, as identified in the Federal Facility Agreement and Consent Order (FFACO). A modification to the FFACOwas approved in May 2010 to transfer the two Railroad Tracks corrective action sites (CASs) from CAU 114 into CAU539. The two CASs are located in Areas 25 and 26 of the Nevada Test Site: • 25-99-21, Area 25 Railroad Tracks • 26-99-05, Area 26 Railroad Tracks This plan provides the methodology for field activities needed to gather the necessary information for closing the two CASs. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of the CAU 539 Railroad Tracks CASs using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation should support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place with use restrictions. This will be presented in a closure report that will be prepared and submitted to the NDEP for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on December 14, 2009, by representatives of U.S.Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Navarro Nevada Environmental Services, LLC (NNES); and National Security Technologies

  6. Prioritization of forest restoration projects: Tradeoffs between wildfire protection, ecological restoration and economic objectives

    Kevin C. Vogler; Alan A. Ager; Michelle A. Day; Michael Jennings; John D. Bailey

    2015-01-01

    The implementation of US federal forest restoration programs on national forests is a complex process that requires balancing diverse socioecological goals with project economics. Despite both the large geographic scope and substantial investments in restoration projects, a quantitative decision support framework to locate optimal project areas and examine...

  7. Mutation of the protein kinase C site in borna disease virus phosphoprotein abrogates viral interference with neuronal signaling and restores normal synaptic activity.

    Christine M A Prat

    2009-05-01

    Full Text Available Understanding the pathogenesis of infection by neurotropic viruses represents a major challenge and may improve our knowledge of many human neurological diseases for which viruses are thought to play a role. Borna disease virus (BDV represents an attractive model system to analyze the molecular mechanisms whereby a virus can persist in the central nervous system (CNS and lead to altered brain function, in the absence of overt cytolysis or inflammation. Recently, we showed that BDV selectively impairs neuronal plasticity through interfering with protein kinase C (PKC-dependent signaling in neurons. Here, we tested the hypothesis that BDV phosphoprotein (P may serve as a PKC decoy substrate when expressed in neurons, resulting in an interference with PKC-dependent signaling and impaired neuronal activity. By using a recombinant BDV with mutated PKC phosphorylation site on P, we demonstrate the central role of this protein in BDV pathogenesis. We first showed that the kinetics of dissemination of this recombinant virus was strongly delayed, suggesting that phosphorylation of P by PKC is required for optimal viral spread in neurons. Moreover, neurons infected with this mutant virus exhibited a normal pattern of phosphorylation of the PKC endogenous substrates MARCKS and SNAP-25. Finally, activity-dependent modulation of synaptic activity was restored, as assessed by measuring calcium dynamics in response to depolarization and the electrical properties of neuronal networks grown on microelectrode arrays. Therefore, preventing P phosphorylation by PKC abolishes viral interference with neuronal activity in response to stimulation. Our findings illustrate a novel example of viral interference with a differentiated neuronal function, mainly through competition with the PKC signaling pathway. In addition, we provide the first evidence that a viral protein can specifically interfere with stimulus-induced synaptic plasticity in neurons.

  8. Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1

    NONE

    1993-10-29

    This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.

  9. Fernald restoration: ecologists and engineers integrate restoration and cleanup

    Woods, Eric; Homer, John

    2002-07-15

    As cleanup workers excavate pits and tear down buildings at the Fernald site in southwest Ohio, site ecologists are working side-by-side to create thriving wetlands and develop the early stages of forest, prairie, and savanna ecosystems to restore natural resources that were impacted by years of site operations. In 1998, the U.S. Department of Energy-Fernald Office (DOE-FN) and its cleanup contractor, Fluor Fernald, Inc., initiated several ecological restoration projects in perimeter areas of the site (e.g., areas not used for or impacted by uranium processing or waste management). The projects are part of Fernald's final land use plan to restore natural resources over 904 acres of the 1,050-acre site. Pete Yerace, the DOE-FN Natural Resource Trustee representative is working with the Fernald Natural Resource Trustees in an oversight role to resolve the state of Ohio's 1986 claim against DOE for injuries to natural resources. Fluor Fernald, Inc., and DOE-FN developed the ''Natural Resource Restoration Plan'', which outlines 15 major restoration projects for the site and will restore injured natural resources at the site. In general, Fernald's plan includes grading to maximize the formation of wetlands or expanded floodplain, amending soil where topsoil has been removed during excavation, and establishing native vegetation throughout the site. Today, with cleanup over 35 percent complete and site closure targeted for 2006, Fernald is entering a new phase of restoration that involves heavily remediated areas. By working closely with engineers and cleanup crews, site ecologists can take advantage of remediation fieldwork (e.g., convert an excavated depression into a wetland) and avoid unnecessary costs and duplication. This collaboration has also created opportunities for relatively simple and inexpensive restoration of areas that were discovered during ongoing remediation. To ensure the survival of the plant material in heavily

  10. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada Test Site, Nevada, Revision 0

    Mark Krauss

    2010-07-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mud Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible

  11. Interim restorations.

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  12. Wetlands Restoration Definitions and Distinctions

    Ecological restoration is a valuable endeavor that has proven very difficult to define. The term indicates that degraded and destroyed natural wetland systems will be reestablished to sites where they once existed. But, what wetland ecosystems are we talki

  13. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada Test Site, Nevada, Revision 1

    2008-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. The Test Cell C (TCC) Facility is located in Area 25 of the Nevada Test Site (NTS) approximately 25 miles northwest of Mercury, Nevada (Figure 1). CAU 116 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) of 1996 (as amended February 2008) and consists of two Corrective Action Sites (CASs): (1) CAS 25-23-20, Nuclear Furnace Piping; and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 is described in the FFACO as the TCC Facility but actually includes Building 3210 and attached concrete shield wall only. CAU 116 will be closed by demolishing Building 3210, the attached concrete shield wall, and the nuclear furnace piping. In addition, as a best management practice (BMP), Building 3211 (moveable shed) will be demolished due to its close proximity to Building 3210. This will aid in demolition and disposal operations. Radiological surveys will be performed on the demolition debris to determine the proper disposal pathway. As much of the demolition debris as space allows will be placed into the Building 3210 basement structure. After filling to capacity with demolition debris, the basement structure will be mounded or capped and closed with administrative controls. Prior to beginning demolition activities and according to an approved Sampling and Analysis Plan (SAP), representative sampling of surface areas that are known, suspected, or have the potential to contain hazardous constituents such as lead or polychlorinated biphenyls (PCBs) will be performed throughout all buildings and structures. Sections 2.3.2, 4.2.2.2, 4.2.2.3, 4.3, and 6.2.6.1 address the methodologies employed that assure the solid debris placed in the basement structure will not contain contaminants of concern (COCs) above hazardous waste levels. The anticipated post

  14. 50 CFR 85.10 - Purpose and scope.

    2010-10-01

    ...) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM CLEAN VESSEL ACT GRANT PROGRAM General § 85.10 Purpose and scope. The purpose of this part is to establish requirements for state participation in the... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Purpose and scope. 85.10 Section 85.10...

  15. ramic restorations

    Ashish R Jain

    2013-01-01

    Full Text Available Rehabilitation of a patient with severely worn dentition after restoring the vertical dimension is a complex procedure and assessment of the vertical dimension is an important aspect in these cases. This clinical report describes the full mouth rehabilitation of a patient who was clinically monitored to evaluate the adaptation to a removable occlusal splint to restore vertical dimension for a period 1 month and provisional restorations to determine esthetic and functional outcome for a period of 3 months. It is necessary to recognizing that form follows function and that anterior teeth play a vital role in the maintenance of oral health. Confirmation of tolerance to changes in the vertical dimension of occlusion (VDO is of paramount importance. Articulated study casts and a diagnostic wax-up can provide important information for the evaluation of treatment options. Alteration of the VDO should be conservative and should not be changed without careful consideration.

  16. Hair restoration.

    Rawnsley, Jeffrey D

    2008-08-01

    The impact of male hair loss as a personal and social marker of aging is tremendous and its persistence as a human concern throughout recorded history places it in the forefront of male concern about the physical signs of aging. Restoration of the frontal hairline has the visual effect of re-establishing facial symmetry and turning back time. Follicular unit transplantation has revolutionized hair restoration, with its focus on redistributing large numbers of genetically stable hair to balding scalp in a natural distribution. Follicular unit hair restoration surgery is a powerful tool for the facial plastic surgeon in male aesthetic facial rejuvenation because it offers high-impact, natural-appearing results with minimal downtime and risk for adverse outcome.

  17. Steam, solarization, and tons of prevention: the San Francisco Public Utilities Commission's fight to contain Phytophthoras in San Francisco Bay area restoration sites

    Greg Lyman; Jessica Appel; Mia Ingolia; Ellen Natesan; Joe Ortiz

    2017-01-01

    To compensate for unavoidable impacts associated with critical water infrastructure capital improvement projects, the San Francisco Public Utilities Commission (SFPUC) restored over 2,050 acres of riparian, wetland, and upland habitat on watershed lands in Alameda, Santa Clara, and San Mateo Counties. Despite strict bio-sanitation protocols, plant pathogens (...

  18. Fiscal year 1990 Rocky Flats Plant environmental restoration program current-year work plan

    Nielsen, T.; Waage, E.; Miller, D.

    1990-01-01

    This paper reports on the FY90 Current Year Work Plan (CYWP), intended to serve as a guiding document with which the Environmental Restoration and RCRA Compliance programs will be implemented at the Rocky Flats Plant, The Current Year Work Plan document serves to provide in one single document any cross-references necessary to understand how the DOE Five Year Plan, Site Specific Plan, or any other related documents fit into the Current Year Work Plan for the Rocky Flats Environmental Restoration. The scope of this paper will compare the planned Fiscal Year 1990 environmental restoration activities to those actually achieved at the end of the fiscal year. The DOE Headquarters (HQ) issued the Environmental Restoration and Waste Management (ER/WM) Five-Year Plan (FYP). The purpose of the FYP is to establish an agenda for compliance and cleanup against which progress will be measured. The Five Year Plan has been updated to include the Colorado Department of Health (CDH), Evironmental Protection Agency (EPA), and Department of Energy (DOE) Inter Agency Agreement Environmental Restoration activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes

  19. Transparent Restoration

    Barou, L.; Bristogianni, T.; Oikonomopoulou, F.

    2017-01-01

    This paper investigates the application of structural glass in restoration and conservation practices in order to highlight and safeguard our built heritage. Cast glass masonry is introduced in order to consolidate a half-ruined historic tower in Greece, by replacing the original parts of the façade

  20. Restorative neuroscience

    Andres, Robert H; Meyer, Morten; Ducray, Angélique D

    2008-01-01

    There is increasing interest in the search for therapeutic options for diseases and injuries of the central nervous system (CNS), for which currently no effective treatment strategies are available. Replacement of damaged cells and restoration of function can be accomplished by transplantation of...

  1. Environmental Restoration

    Zeevaert, T.; Vanmarcke, H

    1998-07-01

    The objectives of SCK-CEN's programme on environmental restoration are (1) to optimize and validate models for the impact assessment from environmental, radioactive contaminations, including waste disposal or discharge; (2) to support the policy of national authorities for public health and radioactive waste management. Progress and achievements in 1997 are reported.

  2. Market scope

    2002-01-01

    Nova Scotia's Energy Strategy is aimed at opening the electricity market to wholesale competition, allowing eligible wholesale customers (such as municipal distribution utilities) to buy their electricity from competitive sources. The Nova Scotia Electricity Marketplace Governance Committee (EMGC) is concerned that this will not promote long-term competition because these eligible customers form only a very small fraction (1.6 per cent) of the total electricity demand in the province. This report examines the possible extensions of competition beyond the minimum specified in the Energy Strategy. It also identifies approaches that the EMGC may consider, including other potential levels of competition and their associated issues. The report discussed the issue of implementing wholesale competition as it relates to unbundling of the transmission tariff from the cost of energy supply and from the cost of distribution in retail marketing. The stages of expanding the market scope were also described with reference to large industrial customers, medium industrial and large commercial customers, and small commercial and residential customers. The report states that it is unlikely that the transition to an open access transmission market will need to be reversed, as it is likely to be an essential component of any further development. The EMGC feels it could minimize future transition costs and promote future evolution of competition by recommending for an institutional and market structure that is compatible with a broader competitive market

  3. Development of a portable teleoperated robot for the manipulation of a backhoe shovel for the restoration of disaster-stricken sites

    Tanaka, Toshihiko; Sakai, Yosiharu; Konomi, Yosiyuki; Chayama, Kazuhiro; Minamoto, Masahiko; Matsunaga, Katsuya

    1999-11-01

    Restoration activities after disasters such as landslides or rock avalanches require rapid action, but in fact, in most cases these activities are very inefficient because of the danger of secondary disasters. A system which can operate reconstruction machinery by remote control was therefore developed, and it was installed on general-purpose construction machines (backhoe shovels). Control performance experiments and field experiments on this developed system were carried out, and its effectiveness was confirmed.

  4. Radioactive characterization of leachates and efflorescences in the neighbouring areas of a phosphogypsum disposal site as a preliminary step before its restoration

    Gázquez, M.J.; Mantero, J.; Mosqueda, F.; Bolívar, J.P.; García-Tenorio, R.

    2014-01-01

    After the recent closure of certain phosphoric acid plants located in the South-West of Spain, it has been decided to restore a big extension (more than six hundred hectares) of salt-marshes, where some million tonnes of phosphogypsum (PG), the main by-product generated by these plants, had been disposed of. This PG is characterized by its content of high activity concentrations of several radionuclides from the uranium series, mainly 226 Ra, 210 Pb, and 210 Po and, to a lesser extent, U-isotopes. The PG disposal area can be considered as a potential source of radionuclides into their nearby environment, through the waters which percolate from them and through the efflorescences formed in their surroundings. For this reason, a detailed radioactive characterization of the mentioned waters and efflorescences has been considered essential for a proper planning of the restoration tasks to be applied in the near future in the zone. To this end, U-isotopes, 234 Th, 230 Th, 226 Ra, 210 Pb and 210 Po activity concentrations have been determined by applying both alpha-particle and gamma-ray spectrometric techniques to selected water and efflorescence aliquots collected in the area. The analysis of the obtained results has enabled to obtain information about the geochemical behaviour in the area of the different radionuclides analyzed; and the conclusion to be drawn that, in the restoration plan under preparation, both the prohibition of outflowing waters from the disposal area to the neighbouring salt-marshes, and the removal of all the efflorescences now disseminated in their surroundings are essential. - Highlights: • A radioactive analysis of efflorescences and leaching water has been carried out. • Water contains very high concentrations of radionuclides from the uranium series. • Efflorescence shows a high activity concentrations of 238 U and 210 Pb. • This information is essential for the future restoration of a phosphogypsum piles

  5. Energy infrastructure of the United States and projected siting needs: Scoping ideas, identifying issues and options. Draft report of the Department of Energy Working Group on Energy Facility Siting to the Secretary

    1993-12-01

    A Department of Energy (DOE) Working Group on Energy Facility Siting, chaired by the Policy Office with membership from the major program and staff offices of the Department, reviewed data regarding energy service needs, infrastructure requirements, and constraints to siting. The Working Group found that the expeditious siting of energy facilities has important economic, energy, and environmental implications for key Administration priorities.

  6. Air National Guard Installation Restoration Program Site Investigation Report, 185th Tactical Fighter Group, Iowa Air National Guard, Sioux Gateway Airport, Sergeant Bluff, Iowa

    1991-10-01

    IDPC /76a-3 I# - iV -I U I TABLE OF CONTENTS (continued) FINAL SITE INVESTIGATION REPORT LIST OF FIGURES Number TitlePage 1.1 Site Locations 1-4 1.2 Site...for Laboratory Analysis 4-62 4.17 Detected Compounds in Soil Samples - Site 2 4-63 4.18 Detected Compounds in Water Samples - Site 2 4-65 " iDPC /7a36...USEPA - United States Environmental Protection Agency UST - underground storage tank " IDPC /7"-3" - viii - I FINAL EXECUTIVE SUMMARY This report documents

  7. Scoping evaluation of the technical capabilities of DOE sites for disposal of mixed low-level waste. Examples: Sandia National Laboratories and Los Alamos National Laboratory

    Gruebel, M.R.; Parsons, A.M.; Waters, R.D.

    1996-01-01

    The disposal of mixed low-level waste has become an issue for the U.S. Department of Energy and the States since the inception of the Federal Facilities Compliance Act in 1992. Fifteen sites, including Sandia National Laboratories (SNL) and Los Alamos National Laboratory (LANL), have been evaluated to estimate their technical capabilities for disposal of this type of waste after it has been subjected to treatment processes. The analyses were designed to quantify the maximum permissible concentrations of radioactive and hazardous constituents in mixed low-level waste that could potentially be disposed of in a facility at one of the fifteen sites and meet regulatory requirements. The evaluations provided several major insights about the disposal of mixed low-level waste. All of the fifteen sites have the technical capability for disposal of some waste. Maximum permissible concentrations for the radioactive component of the waste at and sites such as SNL and LANL are almost exclusively determined by pathways other than through groundwater. In general, for the hazardous component of the waste, travel times through groundwater to a point 100 meters from the disposal facility are on the order of thousands of years. The results of the evaluations will be compared to actual treated waste that may be disposed of in a facility at one of these fifteen evaluated sites. These comparisons will indicate which waste streams may exceed the disposal limitations of a site and which component of the waste limits the technical acceptability for disposal. The technical analyses provide only partial input to the decision-making process for determining the disposal sites for mixed low-level waste. Other, less quantitative factors such as social and political issues will also be considered

  8. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  9. Final disposal of spent fuel in the Finnish bedrock. Scope and requirements for site-specific safety analysis; Kaeytetyn polttoaineen loppusijoitus Suomen kallioperaeaen. Paikkakohtaisen turvallisuusanalyysin edellytykset ja mahdollisuudet

    NONE

    1996-12-01

    The report is a summary of the research conducted in the period 1993 to 1996 into safety of spent fuel final disposal. The principal goal of the research in this period, as set in 1993, was to develop a strategy for site-specific safety analysis. At the same time efforts were to be continued to gather data and validate the technical approach for the analysis. The work aimed at having the data needed for the analysis available at the end of year 1998. A safety assessment update, TILA-96, prepared by VTT Energy, is published as a separate report. The assessment is based on the TVO-92 safety analysis, but takes into account the knowledge acquired after 1992 on safety aspects of the disposal system and the data gathered from the site investigations made by TVO and from the beginning of 1996, by Posiva. Since the site investigations are still ongoing and much of the data gathered still pending interpretation, only limited amount of new site-specific information has been available for the present assessment. (172 refs.).

  10. Restoration of biogeochemical function in mangrove forests

    McKee, K.L.; Faulkner, P.L.

    2000-01-01

    Forest structure of mangrove restoration sites (6 and 14 years old) at two locations (Henderson Creek [HC] and Windstar [WS]) in southwest Florida differed from that of mixed-basin forests (>50 years old) with which they were once contiguous. However, the younger site (HC) was typical of natural, developing forests, whereas the older site (WS) was less well developed with low structural complexity. More stressful physicochemical conditions resulting from incomplete tidal flushing (elevated salinity) and variable topography (waterlogging) apparently affected plant survival and growth at the WS restoration site. Lower leaf fall and root production rates at the WS restoration site, compared with that at HC were partly attributable to differences in hydroedaphic conditions and structural development. However, leaf and root inputs at each restoration site were not significantly different from that in reference forests within the same physiographic setting. Macrofaunal consumption of tethered leaves also did not differ with site history, but was dramatically higher at HC compared with WS, reflecting local variation in leaf litter processing rates, primarily by snails (Melampus coffeus). Degradation of leaves and roots in mesh bags was slow overall at restoration sites, however, particularly at WS where aerobic decomposition may have been more limited. These findings indicate that local or regional factors such as salinity regime act together with site history to control primary production and turnover rates of organic matter in restoration sites. Species differences in senescent leaf nitrogen content and degradation rates further suggest that restoration sites dominated by Laguncularia racemosa and Rhizophora mangle should exhibit slower recycling of nutrients compared with natural basin forests where Avicennia germinans is more abundant. Structural development and biogeochemical functioning of restored mangrove forests thus depend on a number of factors, but site

  11. Technical approach to groundwater restoration

    1993-01-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) and minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures

  12. Development of an Assessment Framework for Restored Forested Wetlands

    Randall K. Kolka; Carl C. Trettin; E.A. Nelson

    1998-01-01

    Development of an assessment framework and associated indicators that can be used to evaluate the effectiveness of a wetland restoration is critical to demonstrating the sustainability of restored sites. An interdisciplinary approach was developed to assess how succession is proceeding on a restored bottomland site in South Carolina relative to an undisturbed...

  13. Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017

    Surovchak, Scott [USDOE Office of Legacy Management, Washington, DC (United States); Daniel, Joe [Navarro Research and Engineering, Inc., Oak Ridge, TN (United States)

    2017-01-01

    The Young - Rainey STAR Center (Science, Technology, and Research Center) at the Pinellas County, Florida, Site is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 96-acre STAR Center is located in Largo, Florida, and lies in the northeast quarter of Section 13, Township 30 South, Range 15 East (Figure 1). While it was owned by DOE, the purpose of the site was to develop and manufacture components for the nation’s nuclear weapons program. In 1987, the U.S. Environmental Protection Agency (EPA) performed a Resource Conservation and Recovery Act Facility Assessment (EPA 1988) at the site to gather information on potential releases of hazardous materials. In February of 1990, EPA issued a Hazardous and Solid Waste Amendments permit to DOE, requiring DOE to investigate and perform remediation activities in those areas designated as solid-waste management units (SWMUs) contaminated by hazardous materials resulting from DOE operations. A total of 17 SWMUs were identified and investigated at the STAR Center. By 1997, 13 of the 17 SWMUs had been remediated or approved for no further action. More recently, the Florida Department of Environmental Protection (FDEP) executed Conditional Site Rehabilitation Completion Orders for the Northeast Site and the Wastewater Neutralization Area on July 27, 2016, stating that no further action is required for those SWMUs. The Building 100 Area (a combination of the Old Drum Storage Site and the Building 100-Industrial Drain Leaks SWMUs) comprises the only two active SWMUs at the STAR Center (Figure 2). This document serves as the semiannual progress report for the SWMUs by providing the results of recent monitoring activities and a summary of ongoing and projected work. The STAR Center is owned by the Pinellas County Industrial Development Authority, but DOE is responsible for remediation activities at the site. Additional background information for the site is contained in the Long-Term Surveillance

  14. Hanford Site Waste Management Plan

    1988-12-01

    The Hanford Site Waste Management Plan (HWMP) was prepared in accordance with the outline and format described in the US Department of Energy Orders. The HWMP presents the actions, schedules, and projected costs associated with the management and disposal of Hanford defense wastes, both radioactive and hazardous. The HWMP addresses the Waste Management Program. It does not include the Environmental Restoration Program, itself divided into the Environmental Restoration Remedial Action Program and the Decontamination and Decommissioning Program. The executive summary provides the basis for the plans, schedules, and costs within the scope of the Waste Management Program at Hanford. It summarizes fiscal year (FY) 1988 including the principal issues and the degree to which planned activities were accomplished. It further provides a forecast of FY 1989 including significant milestones. Section 1 provides general information for the Hanford Site including the organization and administration associated with the Waste Management Program and a description of the Site focusing on waste management operations. Section 2 and Section 3 describe radioactive and mixed waste management operations and hazardous waste management, respectively. Each section includes descriptions of the waste management systems and facilities, the characteristics of the wastes managed, and a discussion of the future direction of operations

  15. Long term radiological impact of a uranium mine restoration

    Mora, Veronica; Bordonaba Marisa; Sanchez Guillermo

    2008-01-01

    During the 1990s, many uranium mines were closed as consequence of low prices of this mineral. It was due to a decrease in the demand for uranium and an increase in the overall supply. The resulting was a further complicated implementation of sites restorations. This report deals with one of the relevant aspects of the radiological protection scope: 'the evaluation of the long term radiological impact in the population due to the uranium mine restoration activities' for the uranium mine sited in Saelices el Chico (Salamanca, Spain). These restoration activities have basically consisted of recovering the original site by filling the old open pits with the material stockpiled in the waste dumps. The main problems associated with this material include radon release and particles emission. The strategy used to solve this problem has been covered these structures with a layer with beds of clay material rock, waste material and a cover tree. The pathways considered for the radiological impact have been: 1) Inhalation; 2) Ingestion of contaminated water, milk, vegetables and meat; 3) External exposure from clouds immersion, grounds concentrations and direct gamma radiation. Three computer codes have been used with the object of evaluating the above-mentioned impact. Two of them are well-known NRC (Nuclear Regulatory Commission) codes: RESRAD 6.30 and MILDOS-AREA. We have also applied DOEFLURA, developed in ENUSA [1, 2, 3]. Four scenarios have been studied: Resident Farmer Scenario, Resident scenario, Livestock pasture scenario and Forest scenario, Estimation of radioactive doses for the member of the public in the different scenarios has been calculated with this programme. A period of 3500 years from now has been studied. (author)

  16. Use of Sodium Dithionite as Part of a More Efficient Groundwater Restoration Method Following In-situ Recovery of Uranium at the Smith-Ranch Highland Site in Wyoming

    Harris, R.; Reimus, P. W.; Ware, D.; Williams, K.; Chu, D.; Perkins, G.; Migdissov, A. A.; Bonwell, C.

    2017-12-01

    Uranium is primarily mined for nuclear power production using an aqueous extraction technique called in-situ recovery (ISR). ISR can pollute groundwater with residual uranium and other heavy metals. Reverse osmosis and groundwater sweep are currently used to restore groundwater after ISR mining, but are not permanent solutions. Sodium dithionite is being tested as part of a method to more permanently restore groundwater after ISR mining at the Smith-Ranch Highland site in Wyoming. Sodium dithionite is a chemical reductant that can reduce sediments that were oxidized during ISR. The reduced sediments can reduce soluble uranium (VI) in the groundwater to insoluble uranium (IV). Laboratory studies that use sodium dithionite to treat sediments and waters from the site may help predict how it will behave during a field deployment. An aqueous batch experiment showed that sodium dithionite reduced uranium in post-mined untreated groundwater from 38 ppm to less than 1 ppm after 1 day. A sediment reduction batch experiment showed that sodium dithionite-treated sediments were capable of reducing uranium in post-mined untreated groundwater from 38 ppm to 2 ppm after 7 days. One column experiment is showing post-mined sodium dithionite-treated sediments are capable of reducing uranium in post-mined groundwater for over 30 pore volumes past the initial injection. While these results are promising for field deployments of sodium dithionite, another column experiment with sodium dithionite-treated sediments containing uranium rich organic matter is showing net production of uranium instead of uranium uptake. Sodium dithionite appears to liberate uranium from the organic matter. Another sediment reduction experiment is being conducted to further investigate this hypothesis. These experiments are helping guide plans for field deployments of sodium dithionite at uranium ISR mining sites.

  17. The land value impacts of wetland restoration.

    Kaza, Nikhil; BenDor, Todd K

    2013-09-30

    U.S. regulations require offsets for aquatic ecosystems damaged during land development, often through restoration of alternative resources. What effect does large-scale wetland and stream restoration have on surrounding land values? Restoration effects on real estate values have substantial implications for protecting resources, increasing tax base, and improving environmental policies. Our analysis focuses on the three-county Raleigh-Durham-Chapel Hill, North Carolina region, which has experienced rapid development and extensive aquatic ecological restoration (through the state's Ecosystem Enhancement Program [EEP]). Since restoration sites are not randomly distributed across space, we used a genetic algorithm to match parcels near restoration sites with comparable control parcels. Similar to propensity score analysis, this technique facilitates statistical comparison and isolates the effects of restoration sites on surrounding real estate values. Compared to parcels not proximate to any aquatic resources, we find that, 1) natural aquatic systems steadily and significantly increase parcel values up to 0.75 mi away, and 2) parcels 0.5 mi from EEP sites gain substantial amenity value. When we control for intervening water bodies (e.g. un-restored streams and wetlands), we find a similar inflection point whereby parcels points to the need for higher public visibility of aquatic ecosystem restoration programs and increased public information about their value. Copyright © 2013 Elsevier Ltd. All rights reserved.

  18. Basic research for environmental restoration

    1990-12-01

    The Department of Energy (DOE) is in the midst of a major environmental restoration effort to reduce the health and environmental risks resulting from past waste management and disposal practices at DOE sites. This report describes research needs in environmental restoration and complements a previously published document, DOE/ER-0419, Evaluation of Mid-to-Long Term Basic Research for Environmental Restoration. Basic research needs have been grouped into five major categories patterned after those identified in DOE/ER-0419: (1) environmental transport and transformations; (2) advanced sampling, characterization, and monitoring methods; (3) new remediation technologies; (4) performance assessment; and (5) health and environmental effects. In addition to basic research, this document deals with education and training needs for environmental restoration. 2 figs., 6 tabs

  19. Basic research for environmental restoration

    1990-12-01

    The Department of Energy (DOE) is in the midst of a major environmental restoration effort to reduce the health and environmental risks resulting from past waste management and disposal practices at DOE sites. This report describes research needs in environmental restoration and complements a previously published document, DOE/ER-0419, Evaluation of Mid-to-Long Term Basic Research for Environmental Restoration. Basic research needs have been grouped into five major categories patterned after those identified in DOE/ER-0419: (1) environmental transport and transformations; (2) advanced sampling, characterization, and monitoring methods; (3) new remediation technologies; (4) performance assessment; and (5) health and environmental effects. In addition to basic research, this document deals with education and training needs for environmental restoration. 2 figs., 6 tabs.

  20. Annual variation in polychlorinated biphenyl (PCB) exposure in tree swallow (Tachycineta bicolor) eggs and nestlings at Great Lakes Restoration Initiative (GLRI) study sites

    Custer, Christine M.; Custer, Thomas W.; Dummer, Paul; Goldberg, Diana R.; Franson, J. Christian

    2018-01-01

    Tree swallow (Tachycineta bicolor) eggs and nestlings were collected from 16 sites across the Great Lakes to quantify normal annual variation in total polychlorinated biphenyl (PCB) exposure and to validate the sample size choice in earlier work. A sample size of five eggs or five nestlings per site was adequate to quantify exposure to PCBs in tree swallows given the current exposure levels and variation. There was no difference in PCB exposure in two randomly selected sets of five eggs collected in the same year, but analyzed in different years. Additionally, there was only modest annual variation in exposure, with between 69% (nestlings) and 73% (eggs) of sites having no differences between years. There was a tendency, both statistically and qualitatively, for there to be less exposure in the second year compared to the first year.

  1. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 2

    Lambert, K.A.; Mitchell, M.M.; Jean, D.; Brown, C.; Byrd, C.S.

    1997-09-01

    This report contains the Appendices A-L including Voluntary Corrective Measure Plans, Waste Management Plans, Task-Specific Health and Safety Plan, Analytical Laboratory Procedures, Soil Sample Results, In-Situ Gamma Spectroscopy Results, Radionuclide Activity Summary, TCLP Soil Sample Results, Waste Characterization Memoranda, Waste Drum Inventory Data, Radiological Risk Assessment, and Summary of Site-Specific Recommendations

  2. United States Department of Agriculture Forest Service 1996 annual report wetlands research related to the Pen Branch restoration effort on the Savannah River site

    Nelson, E.A. [Westinghouse Savannah River Company, Aiken, SC (United States); Kolka, R.K. [USDA Forest Service, Charleston, SC (United States); Trettin, C.C. [USDA Forest Service, Charleston, SC (United States)

    1997-01-01

    This report documents the role of the USDA Forest Service and their collaborators (SRTC, SREL, and several universities) in wetlands monitoring and research on the Savannah River Site. This report describes the rationales, methods, and results (when available) of these studies and summarizes and integrates the available information through 1996.

  3. Postconstruction report of the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    Oakley, L.B.; Siberell, J.K.; Voskuil, T.L.

    1993-06-01

    Remedial actions conducted under the auspices of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) were completed at the Y-12 United Nuclear Corporation (UNC) Disposal Site in August 1992. The purpose of this Postconstruction Report is to summarize numerous technical reports and provide CERCLA documentation for completion of the remedial actions. Other CERCLA reports, such as the Feasibility Study for the UNC Disposal Site, provide documentation leading up to the remedial action decision. The remedial action chosen, placement of a modified RCRA cap, was completed successfully, and performance standards were either met or exceeded. This remedial action provided solutions to two environmentally contaminated areas and achieved the goal of minimizing the potential for contamination of the shallow groundwater downgradient of the site, thereby providing protection of human health and the environment. Surveillance and maintenance of the cap will be accomplished to ensure cap integrity, and groundwater monitoring downgradient of the site will continue to confirm the acceptability of the remedial action chosen.

  4. Installation Restoration Program. Site Investigation Report. Volume 1. 152nd Tactical Reconnaissance Group, Nevada Air National Guard, Reno Cannon International Airport, Reno, Nevada

    1994-04-01

    measure RRI - Rapid Response Initiative RT - retention time s - seconds SDG - sample delivery group I SI - site investigation SMCLS - secondary maximum...tape and a compass and each grid node was marked with a wooden stake or fluorescent orange paint. At least one point on the grid was surveyed so the

  5. Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 120: Areas 5 and 6 Aboveground Storage Tanks, Nevada Test Site, Nevada

    Allison Urban

    1999-06-01

    This Closure Report provides documentation for the closure of Corrective Action Unit 120. CAU 120 consists of two Corrective Action Sites located in Areas 5 and 6 of the Nevada Test Site. CAS 05-01-01 is located in Area 5 and consists of three 45,800-liter aboveground storage tanks, piping, and debris associated with Well RNM-1. CAS 06-01-01 in Area 6 consists of two aboveground storage tanks and two tanker trailers All the CAU 120 items have been used to convey or contain radiologically contaminated fluid from post-nuclear event activities at the NTS> Closure of this CAU was completed by collecting samples to identify the appropriate method of disposal for tanks, piping, debris, and tankers in each CAS. Placing low-level radioactive waste into the appropriate containers and disposing of waste in the Area 5 Radioactive Waste Management Site, the Area 9 10C Landfill, and the Area 3 Radioactive Waste Management Site.

  6. Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 120: Areas 5 and 6 Aboveground Storage Tanks, Nevada Test Site, Nevada

    Allison Urban

    1999-01-01

    This Closure Report provides documentation for the closure of Corrective Action Unit 120. CAU 120 consists of two Corrective Action Sites located in Areas 5 and 6 of the Nevada Test Site. CAS 05-01-01 is located in Area 5 and consists of three 45,800-liter aboveground storage tanks, piping, and debris associated with Well RNM-1. CAS 06-01-01 in Area 6 consists of two aboveground storage tanks and two tanker trailers All the CAU 120 items have been used to convey or contain radiologically contaminated fluid from post-nuclear event activities at the NTS> Closure of this CAU was completed by collecting samples to identify the appropriate method of disposal for tanks, piping, debris, and tankers in each CAS. Placing low-level radioactive waste into the appropriate containers and disposing of waste in the Area 5 Radioactive Waste Management Site, the Area 9 10C Landfill, and the Area 3 Radioactive Waste Management Site

  7. Double tracks test site characterization report

    1996-05-01

    This report presents the results of site characterization activities performed at the Double Tracks Test Site, located on Range 71 North, of the Nellis Air Force Range (NAFR) in southern Nevada. Site characterization activities included reviewing historical data from the Double Tracks experiment, previous site investigation efforts, and recent site characterization data. The most recent site characterization activities were conducted in support of an interim corrective action to remediate the Double Tracks Test Site to an acceptable risk to human health and the environment. Site characterization was performed using a phased approach. First, previously collected data and historical records sere compiled and reviewed. Generalized scopes of work were then prepared to fill known data gaps. Field activities were conducted and the collected data were then reviewed to determine whether data gaps were filled and whether other areas needed to be investigated. Additional field efforts were then conducted, as required, to adequately characterize the site. Characterization of the Double Tracks Test Site was conducted in accordance with the US Department of Energy's (DOE) Streamlined Approach for Environmental Restoration (SAFER)

  8. Single-tooth implant restorations in the esthetic zone--contemporary concepts for optimization and maintenance of soft tissue esthetics in the replacement of failing teeth in compromised sites.

    Mankoo, Tidu

    2007-01-01

    In recent years, implant dentistry has undergone a profound shift in emphasis. The focus evolved first from a surgically driven approach to a prosthetically driven approach and now to a more biologically driven approach with the goal of optimizing and maintaining esthetics. While traditional implant protocols are well established for management of implants placed in healed edentulous sites, the data available offer little clarity on the factors and procedures for long-term esthetic success, particularly in terms of maintained stable soft tissue outcomes around implant restorations in the esthetic zone. Unfortunately, the 90%+ success rates indicated in most studies of dental implant systems today do not represent the success of the esthetic outcome. This has created a demand--certainly among clinicians in private practice focused on the ongoing maintenance of esthetic outcomes--for clear treatment protocols to achieve esthetic results that are not only predictable and consistent but that can withstand the test of time.

  9. Comparing herbaceous plant communities in active and passive riparian restoration.

    Elise S Gornish

    Full Text Available Understanding the efficacy of passive (reduction or cessation of environmental stress and active (typically involving planting or seeding restoration strategies is important for the design of successful revegetation of degraded riparian habitat, but studies explicitly comparing restoration outcomes are uncommon. We sampled the understory herbaceous plant community of 103 riparian sites varying in age since restoration (0 to 39 years and revegetation technique (active, passive, or none to compare the utility of different approaches on restoration success across sites. We found that landform type, percent shade, and summer flow helped explain differences in the understory functional community across all sites. In passively restored sites, grass and forb cover and richness were inversely related to site age, but in actively restored sites forb cover and richness were inversely related to site age. Native cover and richness were lower with passive restoration compared to active restoration. Invasive species cover and richness were not significantly different across sites. Although some of our results suggest that active restoration would best enhance native species in degraded riparian areas, this work also highlights some of the context-dependency that has been found to mediate restoration outcomes. For example, since the effects of passive restoration can be quite rapid, this approach might be more useful than active restoration in situations where rapid dominance of pioneer species is required to arrest major soil loss through erosion. As a result, we caution against labeling one restoration technique as better than another. Managers should identify ideal restoration outcomes in the context of historic and current site characteristics (as well as a range of acceptable alternative states and choose restoration approaches that best facilitate the achievement of revegetation goals.

  10. Pinellas Plant FY1990 site specific implementation plan

    Klein, R.D.

    1990-02-01

    This Site Specific Implementation Plan describes the Corrective Action, Environmental Restoration, and Waste Management activities to be performed at the Pinellas Plant in FY1990 (October 1, 1989 to September 30, 1989). These FY1990 activities are described in the Pinellas Plant FY1991--95 Five-Year Plan. The information used to prepare this plan reflects the best estimate of the project scope, schedules, regulatory, and funding requirements at the time of plan preparation. The Environmental Restoration/Waste Management Five-Year Plan is a dynamic document and will be modified each year; the Site Specific Implementation Plan will, in turn, be modified each year to reflect new findings, information, and knowledge of the various projects. 4 figs., 11 tabs

  11. Streamlined approach for environmental restoration closure report for Corrective Action Unit 120: Areas 5 and 6 aboveground storage tanks, Nevada Test Site, Nevada

    NONE

    1999-06-01

    This Closure Report provides documentation for the closure of Corrective Action Unit (CAU) 120 of the Federal Facilities Agreement and Consent Order (FFACO). CAU 120 consists of two Corrective Action Sites (CASs) located in Areas 5 and 6 of the Nevada Test Site (NTS), which are approximately 130 kilometers (80 miles) northwest of Las Vegas, Nevada. CAS 05-01-01 is located in Area 5 and consists of three 45,800-liter (12,100-gallon) aboveground storage tanks (ASTs), piping, and debris associated with Well RNM-1. CAS 06-01-01 consists of two ASTs and two tanker trailers (all portable) that were originally located at the Area 6 Cp-50 Hot Park and which had been moved to the Area 6 Waste Handling Facility. All of the items in CAU 120 have been used to contain or convey radiologically contaminated fluid that was generated during post-nuclear event activities at the NTS.

  12. Streamlined approach for environmental restoration closure report for Corrective Action Unit 120: Areas 5 and 6 aboveground storage tanks Nevada Test Site, Nevada

    1999-06-01

    This Closure Report provides documentation for the closure of Corrective Action Unit (CAU) 120 of the Federal Facilities Agreement and Consent Order (FFACO). CAU 120 consists of two Corrective Action Sites (CASs) located in Areas 5 and 6 of the Nevada Test Site (NTS), which are approximately 130 kilometers (80 miles) northwest of Las Vegas, Nevada. CAS 05-01-01 is located in Area 5 and consists of three 45,800-liter (12,100-gallon) aboveground storage tanks (ASTs), piping, and debris associated with Well RNM-1. CAS 06-01-01 consists of two ASTs and two tanker trailers (all portable) that were originally located at the Area 6 Cp-50 Hot Park and which had been moved to the Area 6 Waste Handling Facility. All of the items in CAU 120 have been used to contain or convey radiologically contaminated fluid that was generated during post-nuclear event activities at the NTS

  13. A study of the effects of implementing agricultural best management practices and in-stream restoration on suspended sediment, stream habitat, and benthic macroinvertebrates at three stream sites in Surry County, North Carolina, 2004-2007-Lessons learned

    Smith, Douglas G.; Ferrell, G.M.; Harned, Douglas A.; Cuffney, Thomas F.

    2011-01-01

    The effects of agricultural best management practices and in-stream restoration on suspended-sediment concentrations, stream habitat, and benthic macroinvertebrate assemblages were examined in a comparative study of three small, rural stream basins in the Piedmont and Blue Ridge Physiographic Provinces of North Carolina and Virginia between 2004 and 2007. The study was designed to assess changes in stream quality associated with stream-improvement efforts at two sites in comparison to a control site (Hogan Creek), for which no improvements were planned. In the drainage basin of one of the stream-improvement sites (Bull Creek), several agricultural best management practices, primarily designed to limit cattle access to streams, were implemented during this study. In the drainage basin of the second stream-improvement site (Pauls Creek), a 1,600-foot reach of the stream channel was restored and several agricultural best management practices were implemented. Streamflow conditions in the vicinity of the study area were similar to or less than the long-term annual mean streamflows during the study. Precipitation during the study period also was less than normal, and the geographic distribution of precipitation indicated drier conditions in the southern part of the study area than in the northern part. Dry conditions during much of the study limited opportunities for acquiring high-flow sediment samples and streamflow measurements. Suspended-sediment yields for the three basins were compared to yield estimates for streams in the southeastern United States. Concentrations of suspended sediment and nutrients in samples from Bull Creek, the site where best management practices were implemented, were high compared to the other two sites. No statistically significant change in suspended-sediment concentrations occurred at the Bull Creek site following implementation of best management practices. However, data collected before and after channel stabilization at the Pauls

  14. Impact of stream restoration on flood waves

    Sholtes, J.; Doyle, M.

    2008-12-01

    Restoration of channelized or incised streams has the potential to reduce downstream flooding via storing and dissipating the energy of flood waves. Restoration design elements such as restoring meanders, reducing slope, restoring floodplain connectivity, re-introducing in-channel woody debris, and re-vegetating banks and the floodplain have the capacity to attenuate flood waves via energy dissipation and channel and floodplain storage. Flood discharge hydrographs measured up and downstream of several restored reaches of varying stream order and located in both urban and rural catchments are coupled with direct measurements of stream roughness at various stages to directly measure changes to peak discharge, flood wave celerity, and dispersion. A one-dimensional unsteady flow routing model, HEC-RAS, is calibrated and used to compare attenuation characteristics between pre and post restoration conditions. Modeled sensitivity results indicate that a restoration project placed on a smaller order stream demonstrates the highest relative reduction in peak discharge of routed flood waves compared to one of equal length on a higher order stream. Reductions in bed slope, extensions in channel length, and increases in channel and floodplain roughness follow restoration placement with the watershed in relative importance. By better understanding how design, scale, and location of restored reaches within a catchment hydraulically impact flood flows, this study contributes both to restoration design and site decision making. It also quantifies the effect of reach scale stream restoration on flood wave attenuation.

  15. Methodology for ranking restoration options

    Hedemann Jensen, Per

    1999-04-01

    The work described in this report has been performed as a part of the RESTRAT Project FI4P-CT95-0021a (PL 950128) co-funded by the Nuclear Fission Safety Programme of the European Commission. The RESTRAT project has the overall objective of developing generic methodologies for ranking restoration techniques as a function of contamination and site characteristics. The project includes analyses of existing remediation methodologies and contaminated sites, and is structured in the following steps: characterisation of relevant contaminated sites; identification and characterisation of relevant restoration techniques; assessment of the radiological impact; development and application of a selection methodology for restoration options; formulation of generic conclusions and development of a manual. The project is intended to apply to situations in which sites with nuclear installations have been contaminated with radioactive materials as a result of the operation of these installations. The areas considered for remedial measures include contaminated land areas, rivers and sediments in rivers, lakes, and sea areas. Five contaminated European sites have been studied. Various remedial measures have been envisaged with respect to the optimisation of the protection of the populations being exposed to the radionuclides at the sites. Cost-benefit analysis and multi-attribute utility analysis have been applied for optimisation. Health, economic and social attributes have been included and weighting factors for the different attributes have been determined by the use of scaling constants. (au)

  16. Steamlined Approach for Environmental Restoration (SAFER) Plan For Corrective Action Unit 394: Areas 12, 18, and 29, Spill/Release Sites, Nevada Test Site, Nevada (November 2001, Rev. 0)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2001-09-24

    This plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 394: Areas 12, 18, and 29, Spill/Release Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site, consists of six Corrective Action Sites (CASs): CAS 12-25-04, UST 12-16-2 Waste Oil Release; CAS 18-25-02, Oil Spills; CAS 18-25-02, Oil Spills; CAS 18-25-03, Oil Spill; CAS 18-25-04, Spill (Diesel Fuel); CAS 29-44-01, Fuel Spill (a & b). Process knowledge is the basis for the development of the conceptual site models (CSMs). The CSMs describe the most probable scenario for current conditions at each site, and define the assumptions that are the basis for the SAFER plan. The assumptions are formulated from historical information and process knowledge. Vertical migration of contaminant(s) of potential concern (COPCs) is expected to be predominant over lateral migration in the absence of any barrier (with asphalt /concrete being the exception at least two of the CASs). Soil is the impacted or potentially impacted media at all the sites, with asphalt and/or concrete potentially impacted at two of the CASs. Radionuclides are not expected at any CAS; hydrocarbons are the primary COPC at each CAS, and can be used to guide the investigation; future land-use scenarios limit use to various nonresidential uses; and exposure scenarios are limited by future land-use scenarios to site workers. There is sufficient information and process knowledge from historical documentation regarding the expected nature and extent of potential contaminants to recommend closure of CAU 394 using the SAFER process. On completion of the field activities, a Closure Report will be prepared and submitted to the NDEP for review and approval.

  17. Steamlined Approach for Environmental Restoration (SAFER) Plan For Corrective Action Unit 394: Areas 12, 18, and 29, Spill/Release Sites, Nevada Test Site, Nevada (November 2001, Rev. 0); FINAL

    2001-01-01

    This plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 394: Areas 12, 18, and 29, Spill/Release Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site, consists of six Corrective Action Sites (CASs): CAS 12-25-04, UST 12-16-2 Waste Oil Release; CAS 18-25-02, Oil Spills; CAS 18-25-02, Oil Spills; CAS 18-25-03, Oil Spill; CAS 18-25-04, Spill (Diesel Fuel); CAS 29-44-01, Fuel Spill (a and b). Process knowledge is the basis for the development of the conceptual site models (CSMs). The CSMs describe the most probable scenario for current conditions at each site, and define the assumptions that are the basis for the SAFER plan. The assumptions are formulated from historical information and process knowledge. Vertical migration of contaminant(s) of potential concern (COPCs) is expected to be predominant over lateral migration in the absence of any barrier (with asphalt /concrete being the exception at least two of the CASs). Soil is the impacted or potentially impacted media at all the sites, with asphalt and/or concrete potentially impacted at two of the CASs. Radionuclides are not expected at any CAS; hydrocarbons are the primary COPC at each CAS, and can be used to guide the investigation; future land-use scenarios limit use to various nonresidential uses; and exposure scenarios are limited by future land-use scenarios to site workers. There is sufficient information and process knowledge from historical documentation regarding the expected nature and extent of potential contaminants to recommend closure of CAU 394 using the SAFER process. On completion of the field activities, a Closure Report will be prepared and submitted to the NDEP for review and approval

  18. The U.S. Department of Energy Environmental Restoration and Waste Management Five-Year Plan

    Grimm, P.

    1990-01-01

    Within the first month after being confirmed as this country's sixth secretary of energy, Admiral James D. Watkins (US Navy, Retired) promised Congress that he would deliver a comprehensive plan that outlines specific actions to undertake over the next 5 yr to achieve compliance with US environmental laws and to begin to clean up and restore those sites that we have contaminated over the past 40 yr. The Environmental Restoration and Waste Management Five-Year Plan was published in August 1989. As the admiral committed, the plan established and documented an agenda for compliance and cleanup against which progress in the area of environmental restoration and waste management would be measured and specifically identified actions and commitments to achieve this progress. In November 1989, an additional chapter identifying the applied research, development, demonstration, testing, and evaluation (RDDT and E) activities that would support the implementation of the plan was published. Last June, the US Department of Energy (DOE) issued the first annual update of the 5-yr plan. This update covers the years 1992-1996, notes the progress achieved during the past year, and incorporates the scope of both the original plan and the RDDT and E plan. The plan is divided into five sections: corrective activities, environmental restoration, waste operations, technology development, and transportation. Each section explains DOE's overall policies and plans for achieving compliance and cleanup at DOE's nuclear-related facilities

  19. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V.1: Identification and characterization of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    1996-02-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defense related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subject of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. Refs, figs and tabs

  20. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V.1: Identification and characterization of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    NONE

    1996-02-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defense related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subject of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. Refs, figs and tabs.

  1. Annual carbon balance of a peatland 10 yr following restoration

    M. Strack

    2013-05-01

    Full Text Available Undisturbed peatlands represent long-term net sinks of carbon; however, peat extraction converts these systems into large and persistent sources of greenhouse gases. Although rewetting and restoration following peat extraction have taken place over the last several decades, very few studies have investigated the longer term impact of this restoration on peatland carbon balance. We determined the annual carbon balance of a former horticulturally-extracted peatland restored 10 yr prior to the study and compared these values to the carbon balance measured at neighboring unrestored and natural sites. Carbon dioxide (CO2 and methane (CH4 fluxes were measured using the chamber technique biweekly during the growing season from May to October 2010 and three times over the winter period. Dissolved organic carbon (DOC export was measured from remnant ditches in the unrestored and restored sites. During the growing season the restored site had greater uptake of CO2 than the natural site when photon flux density was greater than 1000 μmol m−2 s−1, while the unrestored site remained a source of CO2. Ecosystem respiration was similar between natural and restored sites, which were both significantly lower than the unrestored site. Methane flux remained low at the restored site except from open water pools, created as part of restoration, and remnant ditches. Export of DOC during the growing season was 5.0 and 28.8 g m−2 from the restored and unrestored sites, respectively. Due to dry conditions during the study year all sites acted as net carbon sources with annual balance of the natural, restored and unrestored sites of 250.7, 148.0 and 546.6 g C m−2, respectively. Although hydrological conditions and vegetation community at the restored site remained intermediate between natural and unrestored conditions, peatland restoration resulted in a large reduction in annual carbon loss from the system resulting in a carbon balance more similar to a natural

  2. Wildlife Response to Riparian Restoration on the Sacramento River

    Gregory H Golet

    2008-06-01

    Full Text Available Studies that assess the success of riparian restoration projects seldom focus on wildlife. More generally, vegetation characteristics are studied, with the assumption that animal populations will recover once adequate habitats are established. On the Sacramento River, millions of dollars have been spent on habitat restoration, yet few studies of wildlife response have been published. Here we present the major findings of a suite of studies that assessed responses of four taxonomic groups (insects, birds, bats, and rodents. Study designs fell primarily into two broad categories: comparisons of restoration sites of different ages, and comparisons of restoration sites with agricultural and remnant riparian sites. Older restoration sites showed increased abundances of many species of landbirds and bats relative to younger sites, and the same trend was observed for the Valley elderberry longhorn beetle (Desmocerus californicus dimorphus, a federally threatened species. Species richness of landbirds and ground-dwelling beetles appeared to increase as restoration sites matured. Young restoration sites provided benefits to species that utilize early successional riparian habitats, and after about 10 years, the sites appeared to provide many of the complex structural habitat elements that are characteristic of remnant forest patches. Eleven-year old sites were occupied by both cavity-nesting birds and special-status crevice-roosting bats. Restored sites also supported a wide diversity of bee species, and had richness similar to remnant sites. Remnant sites had species compositions of beetles and rodents more similar to older sites than to younger sites. Because study durations were short for all but landbirds, results should be viewed as preliminary. Nonetheless, in aggregate, they provide convincing evidence that restoration along the Sacramento River has been successful in restoring riparian habitats for a broad suite of faunal species. Not only did

  3. Evaluation of ground freezing for environmental restoration at waste area grouping 5, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Gates, D.D.

    1995-09-01

    A study to evaluate the feasibility of using ground freezing technology to immobilize tritium contaminants was performed as part of the Waste Area Grouping (WAG) 6 Technology Demonstrations initiated by the WAG 6 Record of Agreement. The study included a review of ground freezing technology, evaluation of this technology for environmental restoration, and identification of key technical issues. A proposed ground freezing demonstration for containment of tritium at a candidate Oak Ridge National Laboratory site was developed. The planning requirements for the demonstration were organized into seven tasks including site selection, site characterization, conceptual design, laboratory evaluation, demonstration design, field implementation, and monitoring design. A brief discussion of each of these tasks is provided. Additional effort beyond the scope of this study is currently being directed to the selection of a demonstration site and the identification of funding

  4. Hazard classification of environmental restoration activities at the INEL

    Peatross, R.G.

    1996-04-01

    The following documents require that a hazard classification be prepared for all activities for which US Department of Energy (DOE) has assumed environmental, safety, and health responsibility: the DOE Order 5481.1B, Safety Analysis and Review System and DOE Order 5480.23, Nuclear Safety Analysis Reports. A hazard classification defines the level of hazard posed by an operation or activity, assuming an unmitigated release of radioactive and nonradioactive hazardous material. For environmental restoration activities, the release threshold criteria presented in Hazard Baseline Documentation (DOE-EM-STD-5502-94) are used to determine classifications, such as Radiological, Nonnuclear, and Other Industrial facilities. Based upon DOE-EM-STD-5502-94, environmental restoration activities in all but one of the sites addressed by the scope of this classification (see Section 2) can be classified as ''Other Industrial Facility''. DOE-EM-STD-5502-94 states that a Health and Safety Plan and compliance with the applicable Occupational Safety and Health Administration (OSHA) standards are sufficient safety controls for this classification

  5. A three-step approach to minimise the impact of a mining site on vicuña (Vicugna vicugna) and to restore landscape connectivity.

    Mata, Cristina; Malo, Juan E; Galaz, José Luis; Cadorzo, César; Lagunas, Héctor

    2016-07-01

    Resource extraction projects generate a diversity of negative effects on the environment that are difficult to predict and mitigate. Consequently, adaptive management approaches have been advocated to develop effective responses to impacts that were not predicted. Mammal populations living in or around mine sites are frequently of management concern; yet, there is a dearth of published information on how to minimise the negative effects of different phases of mining operations on them. Here, we present the case study of a copper mine in the Chilean Altiplano, which caused roadkills of the protected vicuña (Vicugna vicugna). This issue led to a three-step solution being implemented: (1) the initial identification of the problem and implementation of an emergency response, (2) the scientific analysis for decision making and (3) the planning and informed implementation of responses for different future scenarios and timescales. The measures taken under each of these steps provide examples of environmental management approaches that make use of scientific information to develop integrated management responses. In brief, our case study showed how (1) the timescale and the necessity/urgency of the case were addressed, (2) the various stakeholders involved were taken into account and (3) changes were included into the physical, human and organisational elements of the company to achieve the stated objectives.

  6. The Ecosystem Functions Model: A Tool for Restoration Planning

    Hickey, John T; Dunn, Chris N

    2004-01-01

    .... Project teams can use the EFM to visualize existing ecologic conditions, highlight promising restoration sites, and assess and rank alternatives according to the relative enhancement (or decline...

  7. Prioritization of Forest Restoration Projects: Tradeoffs between Wildfire Protection, Ecological Restoration and Economic Objectives

    Kevin C. Vogler

    2015-12-01

    Full Text Available The implementation of US federal forest restoration programs on national forests is a complex process that requires balancing diverse socioecological goals with project economics. Despite both the large geographic scope and substantial investments in restoration projects, a quantitative decision support framework to locate optimal project areas and examine tradeoffs among alternative restoration strategies is lacking. We developed and demonstrated a new prioritization approach for restoration projects using optimization and the framework of production possibility frontiers. The study area was a 914,657 ha national forest in eastern Oregon, US that was identified as a national priority for restoration with the goal of increasing fire resiliency and sustaining ecosystem services. The results illustrated sharp tradeoffs among the various restoration goals due to weak spatial correlation of forest stressors and provisional ecosystem services. The sharpest tradeoffs were found in simulated projects that addressed either wildfire risk to the urban interface or wildfire hazard, highlighting the challenges associated with meeting both economic and fire protection goals. Understanding the nature of tradeoffs between restoration objectives and communicating them to forest stakeholders will allow forest managers to more effectively design and implement economically feasible restoration projects.

  8. HANFORD SITE SOLID WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT TECHNICAL INFORMATION DOCUMENT [SEC 1 THRU 4

    FRITZ, L.L.

    2004-01-01

    This Technical Information Document (TID) provides engineering data to support DOE/EIS-0286, ''Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement''. Assumptions and waste volumes used to calculate engineering data are also provided in this document. This chapter provides a brief description of: the Solid Waste Management Program (including a description of waste types and known characteristics of waste covered under the program), the Hanford Site (including a general discussion of the operating areas), and the alternatives analyzed. The Hanford Site Solid Waste Management Program and DOE/EIS-0286 address solid radioactive waste types generated by various activities from both onsite and offsite generators. The Environmental Restoration (ER) waste management activities are not within the scope of DOE/EIS-0286 or this TID. Activities for processing and disposal of immobilized low-activity waste (ILAW) are not within the scope of the Solid Waste Management Program and this TID

  9. PROJECT SCOPE MANAGEMENT PROCESS

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  10. A scoping review of the uses of the care index in children

    Gupta, E; Innes, N; Schuller, A A; Vermaire, J H; Marshman, Z

    OBJECTIVE: To conduct a scoping review of literature to describe how the care index (CI) and restorative index (RI) are used in child populations and to determine whether they are fit for purpose. BASIC RESEARCH DESIGN: Scoping review conducted using the Arksey and O'Malley (2005) framework. METHOD:

  11. Dark diversity illuminates the dim side of restoration

    Moeslund, Jesper Erenskjold; Brunbjerg, Ane Kirstine; Clausen, Kevin Kuhlmann

    Dark diversity consists of the species that are absent from sites where they could potentially thrive despite the fact that they are actually in the regional species pool. Successful ecological restoration requires detailed knowledge of species that are less successful in (re)colonizing restored ...... in future restoration and conservation efforts.......Dark diversity consists of the species that are absent from sites where they could potentially thrive despite the fact that they are actually in the regional species pool. Successful ecological restoration requires detailed knowledge of species that are less successful in (re)colonizing restored...

  12. Lesser prairie-chicken nest site selection, microclimate, and nest survival in association with vegetation response to a grassland restoration program

    Boal, Clint W.; Grisham, Blake A.; Haukos, David A.; Zavaleta, Jennifer C.; Dixon, Charles

    2014-01-01

    Climate models predict that the region of the Great Plains Landscape Conservation Cooperative (GPLCC) will experience increased maximum and minimum temperatures, reduced frequency but greater intensity of precipitation events, and earlier springs. These climate changes along with different landscape management techniques may influence the persistence of the lesser prairie-chicken (Tympanuchus pallidicinctus), a candidate for protection under the Endangered Species Act and a priority species under the GPLCC, in positive or negative ways. The objectives of this study were to conduct (1) a literature review of lesser prairie-chicken nesting phenology and ecology, (2) an analysis of thermal aspects of lesser prairie-chicken nest microclimate data, and (3) an analysis of nest site selection, nest survival, and vegetation response to 10 years of tebuthiuron and/or grazing treatments. We found few reports in the literature containing useful data on the nesting phenology of lesser prairie-chickens; therefore, managers must rely on short-term observations and measurements of parameters that provide some predictive insight into climate impacts on nesting ecology. Our field studies showed that prairie-chickens on nests were able to maintain relatively consistent average nest temperature of 31 °C and nest humidities of 56.8 percent whereas average external temperatures (20.3–35.0 °C) and humidities (35.2–74.9 percent) varied widely throughout the 24 hour (hr) cycle. Grazing and herbicide treatments within our experimental areas were designed to be less intensive than in common practice. We determined nest locations by radio-tagging hen lesser prairie-chickens captured at leks, which are display grounds at which male lesser prairie-chickens aggregate and attempt to attract a female for mating. Because nest locations selected by hen lesser prairie-chicken are strongly associated with the lek at which they were captured, we assessed nesting habitat use on the basis of hens

  13. A Synthesis of Environmental and Plant Community Data for Tidal Wetland Restoration Planning in the Lower Columbia River and Estuary

    Diefenderfer, Heida L.; Borde, Amy B.; Cullinan, Valerie I.

    2013-12-01

    This report reanalyzes and synthesizes previously existing environmental and plant community data collected by PNNL at 55 tidal wetlands and 3 newly restored sites in the lower Columbia River and estuary (LCRE) between 2005 and 2011. Whereas data were originally collected for various research or monitoring objectives of five studies, the intent of this report is to provide only information that will have direct utility in planning tidal wetland restoration projects. Therefore, for this report, all tidal wetland data on plants and the physical environment, which were originally developed and reported by separate studies, were tabulated and reanalyzed as a whole. The geographic scope of the data collected in this report is from Bonneville Lock and Dam to the mouth of the Columbia River

  14. Technology needs assessment for DOE environmental restoration programs

    Duray, J.R.; Carlson, T.J.; Carpenter, C.E.; Cummins, L.E.; Daub, G.J.

    1992-01-01

    The 'Technology Needs Assessment Final Report' describes current and planned environmental restoration activity, identifies technologies intended to be used or under consideration, and ranks technology deficiencies in the U.S. Department of Energy's environmental restoration program. Included in the ranking are treatment technologies, characterization technologies, and non-technology issues that affect environmental restoration. Data used for the assessment was gathered during interviews in the spring of 1991 with DOE site personnel responsible for the environmental restoration work. (author)

  15. Overcoming restoration paradigms: value of the historical record and metapopulation dynamics in native oyster restoration

    Romuald N. Lipcius

    2015-09-01

    Full Text Available Restoration strategies for native oyster populations rely on multiple sources of information, which often conflict due to time- and space-varying patterns in abundance and distribution. For instance, strategies based on population connectivity and disease resistance can differ, and extant and historical records of abundance and distribution are often at odds, such that the optimal strategy is unclear and valuable restoration sites may be excluded from consideration. This was the case for the Lynnhaven River subestuary of lower Chesapeake Bay, which was deemed unsuitable for Eastern Oyster restoration based on physical conditions, disease challenge, and extant oyster abundance. Consequently, we (i evaluated previously unknown historical data from the 1800s, (ii quantified extant oyster recruitment and abundance, physical conditions, and disease presence on constructed restoration reefs and alternative substrates, and (iii assessed simulations from biophysical models to identify potential restoration sites in the metapopulation. The collective data distinguished numerous restoration sites (i in the polyhaline zone (salinity 18.4-22.2 where disease resistance is evolving, (ii where oysters were abundant in the late 1800s-early 1900s, (iii of recent high recruitment, abundance and survival, despite consistent and elevated disease challenge, and (iv interconnected as a metapopulation via larval dispersal. Moreover, a network of constructed restoration reefs met size structure, abundance and biomass standards of restoration success. These findings demonstrate that assumptions about the suitability of sites for oyster restoration based on individual processes can be severely flawed, and that in-depth examination of multiple processes and sources of information are required for oyster reef restoration plans to maximize success. We use these findings and previous information to recommend a strategy for successful restoration of subtidal oyster reefs

  16. Incorporating climate change projections into riparian restoration planning and design

    Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  17. Restoration of Gooseberry Creek

    Jonathan W. Long

    2000-01-01

    Grazing exclusion and channel modifications were used to restore wet meadows along a stream on the Fort Apache Indian Reservation. The efforts are reestablishing functional processes to promote long-term restoration of wetland health and species conservation.

  18. Ecological restoration of litter in mined areas

    Teresinha Gonçalves Bizuti, Denise; Nino Diniz, Najara; Schweizer, Daniella; de Marchi Soares, Thaís; Casagrande, José Carlos; Henrique Santin Brancalion, Pedro

    2016-04-01

    The success of ecological restoration projects depends on going monitoring of key ecological variables to determine if a desired trajectory has been established and, in the case of mining sites, nutrient cycling recovery plays an utmost importance. This study aimed to quantify and compare the annual litter production in native forests, and in restoration sites established in bauxite mines. We collected samples in 6 native forest remnants and 6 year-old restoration sites every month for a period of one year, in the city of Poços de Caldas/MG, SE Brazil. 120 wire collectors were used (0,6x0,6) and suspended 30cm above the soil surface. The material was dried until constant weight, weighed and fractionated in leaves, branches and reproductive material. The average annual litter production was 2,6 Mg ha-1 in native forests and 2,1 in forest in restoration sites, differing statistically. Litter production was higher in the rainy season, especially in September. Among the litter components, the largest contributor to total production was the fraction leaves, with 55,4% of the total dry weight of material collected, followed by reproductive material which contributed 24,5% and branches, with 20%. We conclude that the young areas in restoration process already restored important part, but still below the production observed in native areas.

  19. Estimating the Size and Impact of the Ecological Restoration Economy.

    Todd BenDor

    Full Text Available Domestic public debate continues over the economic impacts of environmental regulations that require environmental restoration. This debate has occurred in the absence of broad-scale empirical research on economic output and employment resulting from environmental restoration, restoration-related conservation, and mitigation actions - the activities that are part of what we term the "restoration economy." In this article, we provide a high-level accounting of the size and scope of the restoration economy in terms of employment, value added, and overall economic output on a national scale. We conducted a national survey of businesses that participate in restoration work in order to estimate the total sales and number of jobs directly associated with the restoration economy, and to provide a profile of this nascent sector in terms of type of restoration work, industrial classification, workforce needs, and growth potential. We use survey results as inputs into a national input-output model (IMPLAN 3.1 in order to estimate the indirect and induced economic impacts of restoration activities. Based on this analysis we conclude that the domestic ecological restoration sector directly employs ~ 126,000 workers and generates ~ $9.5 billion in economic output (sales annually. This activity supports an additional 95,000 jobs and $15 billion in economic output through indirect (business-to-business linkages and increased household spending.

  20. 10 CFR 707.2 - Scope.

    2010-01-01

    ...) High risk of danger to life, the environment, public health and safety, or national security; or (iii... authority of the Atomic Energy Act of 1954, as amended: (1) Management and operating contracts; and (2... WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES General Provisions § 707.2 Scope. (a) This part applies to...

  1. Global Ecosystem Restoration Index

    Fernandez, Miguel; Garcia, Monica; Fernandez, Nestor

    2015-01-01

    The Global ecosystem restoration index (GERI) is a composite index that integrates structural and functional aspects of the ecosystem restoration process. These elements are evaluated through a window that looks into a baseline for degraded ecosystems with the objective to assess restoration...

  2. Linking restoration ecology with coastal dune restoration

    Lithgow, D.; Martínez, M. L.; Gallego-Fernández, J. B.; Hesp, P. A.; Flores, P.; Gachuz, S.; Rodríguez-Revelo, N.; Jiménez-Orocio, O.; Mendoza-González, G.; Álvarez-Molina, L. L.

    2013-10-01

    Restoration and preservation of coastal dunes is urgently needed because of the increasingly rapid loss and degradation of these ecosystems because of many human activities. These activities alter natural processes and coastal dynamics, eliminate topographic variability, fragment, degrade or eliminate habitats, reduce diversity and threaten endemic species. The actions of coastal dune restoration that are already taking place span contrasting activities that range from revegetating and stabilizing the mobile substrate, to removing plant cover and increasing substrate mobility. Our goal was to review how the relative progress of the actions of coastal dune restoration has been assessed, according to the ecosystem attributes outlined by the Society of Ecological Restoration: namely, integrity, health and sustainability and that are derived from the ecological theory of succession. We reviewed the peer reviewed literature published since 1988 that is listed in the ISI Web of Science journals as well as additional references, such as key books. We exclusively focused on large coastal dune systems (such as transgressive and parabolic dunefields) located on natural or seminatural coasts. We found 150 articles that included "coastal dune", "restoration" and "revegetation" in areas such as title, keywords and abstract. From these, 67 dealt specifically with coastal dune restoration. Most of the studies were performed in the USA, The Netherlands and South Africa, during the last two decades. Restoration success has been assessed directly and indirectly by measuring one or a few ecosystem variables. Some ecosystem attributes have been monitored more frequently (ecosystem integrity) than others (ecosystem health and sustainability). Finally, it is important to consider that ecological succession is a desirable approach in restoration actions. Natural dynamics and disturbances should be considered as part of the restored system, to improve ecosystem integrity, health and

  3. ScienceScope: Aerospace

    CSIR

    2006-12-01

    Full Text Available In this edition of ScienceScope, innovations in and around aerodynamics research and development is explored. The publication explores activities in environmentally friendly aerospace technologies to enhance the aviation industry....

  4. Concrete decontamination scoping tests

    Archibald, K.E.

    1995-01-01

    This report details the research efforts and scoping tests performed at the Idaho Chemical Process Plant using scabbling, chemical, and electro-osmotic decontamination techniques on radiologically contaminated concrete

  5. RADAR PPI Scope Overlay

    National Oceanic and Atmospheric Administration, Department of Commerce — RADAR PPI Scope Overlays are used to position a RADAR image over a station at the correct resolution. The archive maintains several different RADAR resolution types,...

  6. Wetland restoration, flood pulsing, and disturbance dynamics

    Middleton, Beth A.

    1999-01-01

    While it is generally accepted that flood pulsing and disturbance dynamics are critical to wetland viability, there is as yet no consensus among those responsible for wetland restoration about how best to plan for those phenomena or even whether it is really necessary to do so at all. In this groundbreaking book, Dr. Beth Middleton draws upon the latest research from around the world to build a strong case for making flood pulsing and disturbance dynamics integral to the wetland restoration planning process.While the initial chapters of the book are devoted to laying the conceptual foundations, most of the coverage is concerned with demonstrating the practical implications for wetland restoration and management of the latest ecological theory and research. It includes a fascinating case history section in which Dr. Middleton explores the restoration models used in five major North American, European, Australian, African, and Asian wetland projects, and analyzes their relative success from the perspective of flood pulsing and disturbance dynamics planning.Wetland Restoration also features a wealth of practical information useful to all those involved in wetland restoration and management, including: * A compendium of water level tolerances, seed germination, seedling recruitment, adult survival rates, and other key traits of wetland plant species * A bibliography of 1,200 articles and monographs covering all aspects of wetland restoration * A comprehensive directory of wetland restoration ftp sites worldwide * An extensive glossary of essential terms

  7. Technology needs for environmental restoration remedial action. Environmental Restoration Program

    Watson, J.S.

    1992-11-01

    This report summarizes the current view of the most important technology needs for the US Department of Energy (DOE) facilities operated by Martin Marietta Energy Systems, Inc. These facilities are the Oak Ridge National Laboratory, the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, the Paducah Gaseous Diffusion Plant, and the Portsmouth Gaseous Diffusion Plant. The sources of information used in this assessment were a survey of selected representatives of the Environmental Restoration (ER) programs at each facility, results from a questionnaire distributed by Geotech CWM, Inc., for DOE, and associated discussions with individuals from each facility. This is not a final assessment, but a brief look at an ongoing assessment; the needs will change as the plans for restoration change and, it is hoped, as some technical problems are solved through successful development programs.

  8. Full-scope training simulators

    Ugedo, E.

    1986-01-01

    The following topics to be covered in this report are: Reasons justifying the use of full-scope simulators for operator qualification. Full-scope simulator description: the control room, the physical models, the computer complex, the instructor's console. Main features of full-scope simulators. Merits of simulator training. The role of full-scope simulators in the training programs. The process of ordering and acquiring a full-scope simulator. Maintaining and updating simulator capabilities. (orig./GL)

  9. Environmental Restoration Disposal Facility Waste Acceptance Criteria

    Dronen, V.R.

    1998-06-01

    The Hanford Site is operated by the U. S. Department of Energy (DOE) with a primary mission of environmental cleanup and restoration. The Environmental Restoration Disposal Facility (ERDF) is an integral part of the DOE environmental restoration effort at the Hanford Site. The purpose of this document is to establish the ERDF waste acceptance criteria for disposal of materials resulting from Hanford Site cleanup activities. Definition of and compliance with the requirements of this document will enable implementation of appropriate measures to protect human health and the environment, ensure the integrity of the ERDF liner system, facilitate efficient use of the available space in the ERDF, and comply with applicable environmental regulations and DOE orders. To serve this purpose, the document defines responsibilities, identifies the waste acceptance process, and provides the primary acceptance criteria and regulatory citations to guide ERDF users. The information contained in this document is not intended to repeat or summarize the contents of all applicable regulations

  10. Green ergonomics: definition and scope.

    Thatcher, Andrew

    2013-01-01

    This paper demonstrates that the goals of ergonomics (i.e. effectiveness, efficiency, health, safety and usability) are closely aligned with the goals of design for environmental sustainability. In this paper, the term 'green ergonomics' is conceptualised to specifically describe ergonomics interventions with a pro-nature emphasis. Green ergonomics is focused on the bi-directional connections between human systems and nature. This involves looking at (1) how ergonomics design and evaluation might be used to conserve, preserve, and restore nature and (2) how ecosystem services might be harnessed to facilitate the improved wellbeing and effectiveness of human systems. The paper proposes the scope of green ergonomics based on these bi-directional relationships in the areas of the design of low resource systems and products, the design of green jobs, and the design for behaviour change. Suggestions for further work in the green ergonomics domain are also made. Given the enormous environmental challenges facing modern industrial society, this paper encourages ergonomics science to embrace a pro-nature understanding of work design and research. This paper sets out the role for green ergonomics based on an appreciation of the human-nature connections that have been integrated with our understanding of ergonomics science and practice.

  11. The cost and feasibility of marine coastal restoration.

    Bayraktarov, Elisa; Saunders, Megan I; Abdullah, Sabah; Mills, Morena; Beher, Jutta; Possingham, Hugh P; Mumby, Peter J; Lovelock, Catherine E

    2016-06-01

    Land-use change in the coastal zone has led to worldwide degradation of marine coastal ecosystems and a loss of the goods and services they provide. Restoration is the process of assisting the recovery of an ecosystem that has been degraded, damaged, or destroyed and is critical for habitats where natural recovery is hindered. Uncertainties about restoration cost and feasibility can impede decisions on whether, what, how, where, and how much to restore. Here, we perform a synthesis of 235 studies with 954 observations from restoration or rehabilitation projects of coral reefs, seagrass, mangroves, salt-marshes, and oyster reefs worldwide, and evaluate cost, survival of restored organisms, project duration, area, and techniques applied. Findings showed that while the median and average reported costs for restoration of one hectare of marine coastal habitat were around US$80000 (2010) and US$1600000 (2010), respectively, the real total costs (median) are likely to be two to four times higher. Coral reefs and seagrass were among the most expensive ecosystems to restore. Mangrove restoration projects were typically the largest and the least expensive per hectare. Most marine coastal restoration projects were conducted in Australia, Europe, and USA, while total restoration costs were significantly (up to 30 times) cheaper in countries with developing economies. Community- or volunteer-based marine restoration projects usually have lower costs. Median survival of restored marine and coastal organisms, often assessed only within the first one to two years after restoration, was highest for saltmarshes (64.8%) and coral reefs (64.5%) and lowest for seagrass (38.0%). However, success rates reported in the scientific literature could be biased towards publishing successes rather than failures. The majority of restoration projects were short-lived and seldom reported monitoring costs. Restoration success depended primarily on the ecosystem, site selection, and techniques

  12. Restorative dentistry for children.

    Donly, Kevin J

    2013-01-01

    This article discusses contemporary pediatric restorative dentistry. Indications and contraindications for the choice of different restorative materials in different clinical situations, including the risk assessment of the patient, are presented. The specific use of glass ionomer cement or resin-modified glass ionomer cement, resin-based composite, and stainless steel crowns is discussed so that preparation design and restoration placement is understood. Copyright © 2013 Elsevier Inc. All rights reserved.

  13. Oxidizer Scoping Studies

    Chancellor, Christopher John [Los Alamos National Laboratory

    2016-11-07

    The purpose of this report is to present the results of the acceptable knowledge (AK) review of oxidizers present in active waste streams, provide a technical analysis of the oxidizers, and report the results of the scoping study testing. This report will determine the fastest burning oxidizer to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-002, Sorbent Scoping Studies, contains similar information for sorbents identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scoping studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.

  14. LogScope

    Havelund, Klaus; Smith, Margaret H.; Barringer, Howard; Groce, Alex

    2012-01-01

    LogScope is a software package for analyzing log files. The intended use is for offline post-processing of such logs, after the execution of the system under test. LogScope can, however, in principle, also be used to monitor systems online during their execution. Logs are checked against requirements formulated as monitors expressed in a rule-based specification language. This language has similarities to a state machine language, but is more expressive, for example, in its handling of data parameters. The specification language is user friendly, simple, and yet expressive enough for many practical scenarios. The LogScope software was initially developed to specifically assist in testing JPL s Mars Science Laboratory (MSL) flight software, but it is very generic in nature and can be applied to any application that produces some form of logging information (which almost any software does).

  15. Environmental Restoration Project - Systems Engineering Management Plan

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  16. Urban river design and aesthetics: A river restoration case study from the UK

    Prior, Jonathan

    2016-01-01

    This paper analyses the restoration of an urbanized section of the River Skerne where it flows through a suburb of Darlington, England; a project which was one of the first comprehensive urban river restorations undertaken in the UK. It is shown how aesthetic values were central to the identification of the River Skerne as a site for restoration, the production of restoration objectives, and a design vision of urban river renewal via restoration. Secondly, the means by which these aesthetic v...

  17. Site development

    Gaynor, R.K.

    1989-01-01

    Development of a low-level radioactive waste land disposal facility is little different than any industrial development of similar scope. Consideration must be made for normal business and operations management, security, facility maintenance, traffic control and necessary amenities for personnel. The item specific to the low-level waste site is the handling of radioactive waste materials and the regulatory and environmental protection procedures that must be planned for and accomodated in the site design and development. Each of these elements and the facility as a whole must be designed to be compatible with local land use plans, available transportation and support services, and the social and economic goals of the local community. Plans should also be made for quality control and orderly construction. This chapter deals with those aspects of the facility, its design and construction which are integral parts to the overall performance of the site

  18. Environmental Restoration Remedial Action Program records management plan

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  19. Ecological restoration [book review

    Eric J. Gustafson

    2010-01-01

    Ecological restoration has increased in prominence in recent years as environmental policies have slowed the rate of environmental degradation in many parts of the world and practitioners have looked for active ways to reverse the damage. Because of the vast number of types and contexts of degraded ecological systems, the field of ecological restoration is still very...

  20. Challenges of ecological restoration

    Halme, Panu; Allen, Katherine A.; Aunins, Ainars

    2013-01-01

    we introduce northern forests as an ecosystem, discuss the historical and recent human impact and provide a brief status report on the ecological restoration projects and research already conducted there. Based on this discussion, we argue that before any restoration actions commence, the ecology......The alarming rate of ecosystem degradation has raised the need for ecological restoration throughout different biomes and continents. North European forests may appear as one of the least vulnerable ecosystems from a global perspective, since forest cover is not rapidly decreasing and many...... on Biological Diversity. Several northern countries are now taking up this challenge by restoring forest biodiversity with increasing intensity. The ecology and biodiversity of boreal forests are relatively well understood making them a good model for restoration activities in many other forest ecosystems. Here...

  1. Retributive and restorative justice.

    Wenzel, Michael; Okimoto, Tyler G; Feather, Norman T; Platow, Michael J

    2008-10-01

    The emergence of restorative justice as an alternative model to Western, court-based criminal justice may have important implications for the psychology of justice. It is proposed that two different notions of justice affect responses to rule-breaking: restorative and retributive justice. Retributive justice essentially refers to the repair of justice through unilateral imposition of punishment, whereas restorative justice means the repair of justice through reaffirming a shared value-consensus in a bilateral process. Among the symbolic implications of transgressions, concerns about status and power are primarily related to retributive justice and concerns about shared values are primarily related to restorative justice. At the core of these processes, however, lies the parties' construal of their identity relation, specifically whether or not respondents perceive to share an identity with the offender. The specific case of intergroup transgressions is discussed, as are implications for future research on restoring a sense of justice after rule-breaking.

  2. Hydrological Classification, a Practical Tool for Mangrove Restoration

    Van Loon, Anne F.; Te Brake, Bram; Van Huijgevoort, Marjolein H. J.; Dijksma, Roel

    2016-01-01

    Mangrove restoration projects, aimed at restoring important values of mangrove forests after degradation, often fail because hydrological conditions are disregarded. We present a simple, but robust methodology to determine hydrological suitability for mangrove species, which can guide restoration practice. In 15 natural and 8 disturbed sites (i.e. disused shrimp ponds) in three case study regions in south-east Asia, water levels were measured and vegetation species composition was determined....

  3. FedScope Employment Cubes

    Office of Personnel Management — This raw data set provides Federal civilian employee population data. The scope of this raw data set includes all data elements used in the creation of the FedScope...

  4. Columbia Estuary Ecosystem Restoration Program: Restoration Design Challenges for Topographic Mounds, Channel Outlets, and Reed Canarygrass

    Diefenderfer, Heida L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Borde, Amy B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sinks, Ian A. [Columbia Land Trust, Vancouver, WA (United States); Cullinan, Valerie I. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-08-31

    The purpose of this study was to provide science-based information to practitioners and managers of restoration projects in the Columbia Estuary Ecosystem Restoration Program (CEERP) regarding aspects of restoration techniques that currently pose known challenges and uncertainties. The CEERP is a program of the Bonneville Power Administration (BPA) and the U.S. Army Corps of Engineers (Corps), Portland District, in collaboration with the National Marine Fisheries Service and five estuary sponsors implementing restoration. The estuary sponsors are Columbia Land Trust, Columbia River Estuary Study Taskforce, Cowlitz Tribe, Lower Columbia Estuary Partnership, and Washington Department of Fish and Wildlife. The scope of the research conducted during federal fiscal year 2015 included three aspects of hydrologic reconnection that were selected based on available scientific information and feedback from restoration practitioners during project reviews: the design of mounds (also called hummocks, peninsulas, or berms); the control of reed canarygrass (Phalaris arundinaceae); and aspects of channel network design related to habitat connectivity for juvenile salmonids.

  5. Special safeguards study. Scopes of work

    1975-06-01

    The Special Safeguards Study (SSS) will be conducted by a combination of (1) contacts with other agencies, (2) NRC staff studies and analysis and (3) contracted studies in specific areas. Most of the study effort will be carried out by contractual support activities. These activities will be devoted to providing technical information, primarily qualitative because of the short term of the study, to enable the staff to determine the most cost-effective sets of measures for plutonium recycle and high-enriched uranium fuel cycle safeguards. The scope of work for these activities is given. The scope of work describes tasks that range from confirming the Commission's safeguards objective to defining specific protection systems for the following siting arrangements: dispersed sites, collocated fuel cycle plants, and mixed parks where reactors, reprocessing plants and fuel fabrication plants are collocated. (U.S.)

  6. Environmental Restoration Program Roadmap: Strategic program plan

    1992-01-01

    This document is a strategic plan for accomplishing environmental restoration objectives at the Department of Energy's (DOE) Portsmouth Gaseous Diffusion Plant (PORTS). Waste Management (WM) for environmental restoration activities and integration of these activities into the PORTS WM operations is addressed in this document. The document provides detailed information concerning specific assumptions and activities required to meet DOE's environmental restoration objectives at this site. Environmental contamination at PORTS consists mainly of spent solvents and low level radionuclides. Solvents were used for industrial metal cleaning operations required to maintain the process during operations. Plumes of groundwater contamination resulting from past disposal of these spent solvents in landfills and impoundments extend from several locations within the site. Also, two sludge impoundments associated with a chromate reduction facility were characterized as having soil and groundwater contaminated with hexavalent chromium

  7. Restoration planning to guide Aichi targets in a megadiverse country.

    Tobón, Wolke; Urquiza-Haas, Tania; Koleff, Patricia; Schröter, Matthias; Ortega-Álvarez, Rubén; Campo, Julio; Lindig-Cisneros, Roberto; Sarukhán, José; Bonn, Aletta

    2017-10-01

    Ecological restoration has become an important strategy to conserve biodiversity and ecosystems services. To restore 15% of degraded ecosystems as stipulated by the Convention on Biological Diversity Aichi target 15, we developed a prioritization framework to identify potential priority sites for restoration in Mexico, a megadiverse country. We used the most current biological and environmental data on Mexico to assess areas of biological importance and restoration feasibility at national scale and engaged stakeholders and experts throughout the process. We integrated 8 criteria into 2 components (i.e., biological importance and restoration feasibility) in a spatial multicriteria analysis and generated 11 scenarios to test the effect of assigning different component weights. The priority restoration sites were distributed across all terrestrial ecosystems of Mexico; 64.1% were in degraded natural vegetation and 6% were in protected areas. Our results provide a spatial guide to where restoration could enhance the persistence of species of conservation concern and vulnerable ecosystems while maximizing the likelihood of restoration success. Such spatial prioritization is a first step in informing policy makers and restoration planners where to focus local and large-scale restoration efforts, which should additionally incorporate social and monetary cost-benefit considerations. © 2017 The Authors. Conservation Biology published by Wiley Periodicals, Inc. on behalf of Society for Conservation Biology.

  8. EarthScope Education and Outreach: Accomplishments and Emerging Opportunities

    Robinson, S.; Ellins, K. K.; Semken, S. C.; Arrowsmith, R.

    2014-12-01

    EarthScope's Education and Outreach (E&O) program aims to increase public awareness of Earth science and enhance geoscience education at the K-12 and college level. The program is distinctive among major geoscience programs in two ways. First, planning for education and public engagement occurred in tandem with planning for the science mission. Second, the NSF EarthScope program includes funding support for education and outreach. In this presentation, we highlight key examples of the program's accomplishments and identify emerging E&O opportunities. E&O efforts have been collaboratively led by the EarthScope National Office (ESNO), IRIS, UNAVCO, the EarthScope Education and Outreach Subcommittee (EEOSC) and PI-driven EarthScope projects. Efforts by the EEOSC, guided by an EarthScope Education and Outreach Implementation Plan that is periodically updated, focus EarthScope E&O. EarthScope demonstrated early success in engaging undergraduate students (and teachers) in its mission through their involvement in siting USArray across the contiguous U.S. Funded E&O programs such as TOTLE, Illinois EarthScope, CEETEP (for K-12), InTeGrate and GETSI (for undergraduates) foster use of freely available EarthScope data and research findings. The Next Generation Science Standards, which stress science and engineering practices, offer an opportunity for alignment with existing EarthScope K-12 educational resources, and the EEOSC recommends focusing efforts on this task. The EEOSC recognizes the rapidly growing use of mobile smart devices by the public and in formal classrooms, which bring new opportunities to connect with the public and students. This will capitalize on EarthScope's already prominent social media presence, an effort that developed to accomplish one of the primary goals of the EarthScope E&O Implementation Plan to "Create a high-profile public identity for EarthScope" and to "Promote science literacy and understanding of EarthScope among all audiences through

  9. Restorative Practices as Formal and Informal Education

    Carter, Candice C.

    2013-01-01

    This article reviews restorative practices (RP) as education in formal and informal contexts of learning that are fertile sites for cultivating peace. Formal practices involve instruction about response to conflict, while informal learning occurs beyond academic lessons. The research incorporated content analysis and a critical examination of the…

  10. A Guide to Bottomland Hardwood Restoration

    2001-06-01

    floristically Ecological Importance of Understory diverse undergrowth may serve to pollinate flowers, Plants including those of trees. Undergrowth vegetation...Herbaceous plants include bedstraw, Variants and associated vegetation. Sycamore- violet, wild carrot, wild lettuce , amsonia, mint, legumes, pecan...elements of bottomland hardwood restoration such as species selection, site preparation, direct seeding, planting of seedlings, and alternative

  11. 75 FR 4006 - Emergency Restoration Plan (ERP)

    2010-01-26

    ... Agency (FEMA) for public assistance grant eligibility in the event of a declared disaster. This amendment... they incur costs for disaster related system repair and restoration by including FEMA requirements in... comments, and viewing the docket after the close of the comment period, is available through the site's...

  12. Learning Social Responsibility in Schools: A Restorative Practice

    Macready, Tom

    2009-01-01

    Vygotsky regarded the site of learning to be within a matrix of relational action. From this perspective, learning social responsibility will involve a focus on the learning environments that are made available in schools. Adapting the concept of restorative justice to a school context, restorative practice offers a range of relevant learning…

  13. Bearing restoration by grinding

    Hanau, H.; Parker, R. J.; Zaretsky, E. V.; Chen, S. M.; Bull, H. L.

    1976-01-01

    A joint program was undertaken by the NASA Lewis Research Center and the Army Aviation Systems Command to restore by grinding those rolling-element bearings which are currently being discarded at aircraft engine and transmission overhaul. Three bearing types were selected from the UH-1 helicopter engine (T-53) and transmission for the pilot program. No bearing failures occurred related to the restoration by grinding process. The risk and cost of a bearing restoration by grinding programs was analyzed. A microeconomic impact analysis was performed.

  14. Scope and closures

    Simpson, Kyle

    2014-01-01

    No matter how much experience you have with JavaScript, odds are you don’t fully understand the language. This concise yet in-depth guide takes you inside scope and closures, two core concepts you need to know to become a more efficient and effective JavaScript programmer. You’ll learn how and why they work, and how an understanding of closures can be a powerful part of your development skillset.

  15. Sorbent Scoping Studies

    Chancellor, Christopher John

    2016-01-01

    The Los Alamos National Laboratory-Carlsbad Operations (LANL-CO) office was tasked by the DOE CBFO, Office of the Manager to perform a review of the acceptable knowledge (AK) to identify the oxidizers and sorbents in transuranic (TRU) waste streams, to conduct scoping studies on the oxidizers and sorbents identified in AK review to inform the Quality Level 1 (QL1) testing, and to conduct a series of QL1 tests to provide the scientific data to support a basis of knowledge document for determining the criteria for (1) accepting waste at the Waste Isolation Pilot Plant (WIPP) without treatment, (2) determining waste that will require treatment, and (3) if treatment is required, how the treatment must be performed. The purpose of this report is to present the results of the AK review of sorbents present in active waste streams, provide a technical analysis of the sorbent list, report the results of the scoping studies for the fastest-burning organic sorbent, and provide the list of organic and inorganic sorbents to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-001, Oxidizer Scoping Studies, has similar information for oxidizers identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scoping studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.

  16. Sorbent Scoping Studies

    Chancellor, Christopher John [Los Alamos National Lab. (LANL), Carlsbad, NM (United States). Difficult Waste Team

    2016-11-14

    The Los Alamos National Laboratory–Carlsbad Operations (LANL-CO) office was tasked by the DOE CBFO, Office of the Manager to perform a review of the acceptable knowledge (AK) to identify the oxidizers and sorbents in transuranic (TRU) waste streams, to conduct scoping studies on the oxidizers and sorbents identified in AK review to inform the Quality Level 1 (QL1) testing, and to conduct a series of QL1 tests to provide the scientific data to support a basis of knowledge document for determining the criteria for (1) accepting waste at the Waste Isolation Pilot Plant (WIPP) without treatment, (2) determining waste that will require treatment, and (3) if treatment is required, how the treatment must be performed. The purpose of this report is to present the results of the AK review of sorbents present in active waste streams, provide a technical analysis of the sorbent list, report the results of the scoping studies for the fastest-burning organic sorbent, and provide the list of organic and inorganic sorbents to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-001, Oxidizer Scoping Studies, has similar information for oxidizers identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scoping studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.

  17. 75 FR 41881 - Notice of Intent To Prepare a Shoreline Restoration and Management Plan/Environmental Impact...

    2010-07-19

    ... lakeshore; and improved water quality. DATES: Any comments on the scope of issues to be addressed in the EIS... Restoration and Management Plan/Environmental Impact Statement (EIS) for Indiana Dunes National Lakeshore... impact statement (EIS) for a Shoreline Restoration and Management Plan (SRMP) for Indiana Dunes National...

  18. The observational approach in environmental restoration

    Smyth, J.D.; Quinn, R.D.

    1991-07-01

    The US Department of Energy (DOE) has committed to completing environmental restoration of its facilities within the next 28 years (DOE 1990b). In order to achieve this, DOE must ensure that its restoration activities are both effective and efficient. A key aspect of fulfilling this commitment is the recognition and management of uncertainty that is inherent in waste-site clean-up actions. The DOE Office of Environmental Restoration (DOE-ER) requested Pacific Northwest Laboratory (PNL) to investigate the applicability and implementation of what is known as the ''observational approach'' to better address these needs. PNL's initial investigation resulted in the positive conclusion that the observational approach had potential benefit to DOE during environmental restoration. In a follow-on effort, PNL supported by CH2M HILL, has been providing guidance to DOE field-offices on observational approach fundamentals, implementation, and application to waste-site remediation. This paper outlines the fundamentals of the observational approach and discusses the progress in integrating the observational approach in DOE's environmental restoration efforts. 9 refs., 2 figs

  19. The effect of peatland drainage and restoration on Odonata species richness and abundance.

    Elo, Merja; Penttinen, Jouni; Kotiaho, Janne S

    2015-04-09

    Restoration aims at reversing the trend of habitat degradation, the major threat to biodiversity. In Finland, more than half of the original peatland area has been drained, and during recent years, restoration of some of the drained peatlands has been accomplished. Short-term effects of the restoration on peatland hydrology, chemistry and vegetation are promising but little is known about how other species groups apart from vascular plants and bryophytes respond to restoration efforts. Here, we studied how abundance and species richness of Odonata (dragonflies and damselflies) respond to restoration. We sampled larvae in three sites (restored, drained, pristine) on each of 12 different study areas. We sampled Odonata larvae before restoration (n = 12), during the first (n = 10) and the third (n = 7) year after restoration and used generalized linear mixed models to analyze the effect of restoration. Drained sites had lower abundance and species richness than pristine sites. During the third year after restoration both abundance and species richness had risen in restored sites. Our results show that Odonata suffer from drainage, but seem to benefit from peatland restoration and are able to colonize newly formed water pools already within three years after restoration.

  20. Coastal Wetland Restoration Bibliography

    Yozzo, David

    1997-01-01

    This bibliography was compiled to provide biologists, engineers, and planners at Corps Districts and other agencies/ institutions with a guide to the diverse body of literature on coastal wetland restoration...

  1. Restoration of ailing wetlands.

    Oswald J Schmitz

    2012-01-01

    Full Text Available It is widely held that humankind's destructive tendencies when exploiting natural resources leads to irreparable harm to the environment. Yet, this thinking runs counter to evidence that many ecological systems damaged by severe natural environmental disturbances (e.g., hurricanes can restore themselves via processes of natural recovery. The emerging field of restoration ecology is capitalizing on the natural restorative tendencies of ecological systems to build a science of repairing the harm inflicted by humans on natural environment. Evidence for this, for example, comes from a new meta-analysis of 124 studies that synthesizes recovery of impacted wetlands worldwide. While it may take up to two human generations to see full recovery, there is promise, given human will, to restore many damaged wetlands worldwide.

  2. Principles of Wetland Restoration

    the return of a degraded ecosystem to a close approximation of its remaining natural potential - is experiencing a groundswell of support across the United States. The number of stream, river, lake, wetland and estuary restoration projects grows yearly

  3. Skjern River Restoration Counterfactual

    Clemmensen, Thomas Juel

    2014-01-01

    In 2003 the Skjern River Restoration Project in Denmark was awarded the prestigious Europa Nostra Prize for ‘conserving the European cultural heritage’ (Danish Nature Agency 2005). In this case, however, it seems that the conservation of one cultural heritage came at the expense of another cultural...... this massive reconstruction work, which involved moving more than 2,7 million cubic meters of earth, cause a lot of ‘dissonance’ among the local population, the resulting ‘nature’ and its dynamic processes are also constantly compromising the preferred image of the restored landscape (Clemmensen 2014......). The presentation offers insight into an on-going research and development project - Skjern River Restoration Counterfactual, which question existing trends and logics within nature restoration. The project explores how the Skjern River Delta could have been ‘restored’ with a greater sensibility for its cultural...

  4. based dynamic voltage restorer

    HOD

    operation due to presence of increased use of nonlinear loads (computers, microcontrollers ... simulations of a dynamic voltage restorer (DVR) was achieved using MATLAB/Simulink. ..... using Discrete PWM generator, then the IGBT inverter.

  5. Cost Estimating Handbook for Environmental Restoration

    1993-01-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals

  6. Case Study of Urban Residential Remediation and Restoration in Port Hope, Canada - 13250

    Geddes, Brian [AMEC Environment and Infrastructure, 140 Quarry Park Blvd., Calgary, AB, T2C 3G3 (Canada); DeJong, John [AMEC Environment and Infrastructure, Port Hope, ON (Canada); Owen, Michael [Low-Level Radioactive Waste Management Office, 196 Toronto Road, Port Hope, ON, L1A 3V5 (Canada)

    2013-07-01

    The Canadian Municipality of Port Hope, Ontario, is located some 100 km east of Toronto and has been the location of radium and/or uranium refining since the 1930's. Historically, these activities involved materials containing radium-226, uranium, arsenic and other contaminants generated by the refining process. In years past, properties and sites in Port Hope became contaminated from spillage during transportation, unrecorded, un-monitored or unauthorized diversion of contaminated fill and materials, wind and water erosion and spread from residue storage areas. Residential properties in Port Hope impacted by radioactive materials are being addressed by the Canadian federal government under programs administered by the Low-Level Radioactive Waste Management Office (LLRWMO) and the Port Hope Area Initiative Management Office (PHAIMO). Issues that currently arise at these properties are addressed by the LLRWMO's Interim Waste Management Program (IWM). In the future, these sites will be included in the PHAIMO's Small Scale Sites (SSS) remedial program. The LLRWMO has recently completed a remediation and restoration program at a residential property in Port Hope that has provided learnings that will be applicable to the PHAIMO's upcoming SSS remedial effort. The work scope at this property involved remediating contaminated refinery materials that had been re-used in the original construction of the residence. Following removal of the contaminated materials, the property was restored for continued residential use. This kind of property represents a relatively small, but potentially challenging subset of the portfolio of sites that will eventually be addressed by the SSS program. (authors)

  7. Leadership success within disaster restoration projects.

    Rapp, Randy R; Baroudi, Bassam

    2014-01-01

    Successful project managers draw their performance from essential leadership traits, as guided by their core values.Within disaster recovery, contractors who mitigate, repair, and reconstruct the built environment are often faced with challenges exceeding the norm. The effective leader is commonly expected to consider stakeholder motivations within distressing situations as well as other external and environmental factors when seeking to lead the project team to successful outcomes. This research is most concerned with leadership within the context of disaster restoration of the built environment. Its stimulus comes from the Restoration Industry Association (RIA)'s efforts to highlight leadership traits and core values for its Certified Restorer Body of Knowledge but would be of value to others associated with disaster recovery operations. Among organizations whose membership includes thousands of practitioners who restore and reconstruct the built environment after disasters, the RIA is the only one yet to formally and substantially research which core values and leader traits are deemed critical for the success of efforts to manage the means and methods applied on recovery job sites. Forty-six seasoned disaster restoration industry project professionals voluntarily responded to a survey questionnaire that sought their opinions about the traits and core values that they consider most important for successful disaster restoration project leadership. The most important leader traits were effective communication, professional competence, and leadership by example. The most important restoration industry values were integrity, compassion, and trustworthiness. The recognized imperative of compassion was unexpected in light of stereotypes often associated with construction-related contractors. This and other findings permit disaster response and recovery stakeholders to better understand qualities they should wish to see in leaders of contractor organizations, which

  8. A Function-Based Framework for Stream Assessment & Restoration Projects

    This report lays out a framework for approaching stream assessment and restoration projects that focuses on understanding the suite of stream functions at a site in the context of what is happening in the watershed.

  9. VT West Branch Natural Channel Design Restoration 2001-2002

    Vermont Center for Geographic Information — (Link to Metadata) Because of the well known problems of the river, the West Branch was identified as a restoration implementation site to be funded as part of the...

  10. Peatland restoration in Canada by the sphagnum moss layer transfer method

    Rochefort, L.; Boismenu, C. [Laval Univ., Quebec City, PQ (Canada). Dept. de Phytologie, Peatland Ecology and Research Group; Quinty, F. [SNC-Lavalin, Montreal, PQ (Canada)

    2009-04-01

    This article described a peatland restoration approach that has received international recognition for restoring the ecological functions of cutover sphagnum dominated peatlands. The Peatland Ecology Research Group (PERG) conducted a long-term study at the Bois-des-Bel (BDB) peatland site in Quebec to restore plant composition to a peat accumulating ecosystem. The sphagnum moss layer transfer restoration method includes 5 obligatory steps and one optional. These include planning; surface preparation; plant collection and spreading; straw mulch spreading; blocking drainage ditches; and fertilization if needed. Variable moisture conditions throughout the restoration site contribute to the spatial variability in the development of the sphagnum layer. The site has been monitored each year since its restoration. sphagnum cover reached 60 per cent in the restored zone in 2005, a value close to the range of sphagnum cover found in natural sites. In addition, a new moss layer has developed with an average of 25 cm in thickness. 27 refs., 4 figs.

  11. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  12. The Management of Dissonance in Nature Restoration

    Clemmensen, Thomas Juel

    2016-01-01

    Nature restoration is far from a neural undertaking. Just like any other type of heritage production, it can be the source of dissonance—‘our’ nature is not necessary ‘their’ nature. Often this dissonance is managed in ways, which are not particularly sensitive to site-specificity. As exemplified...... for multiple interpretations to coexist. Indications can be found in the Re-naturalization of River Aire (2002-2015)—a restoration project, which reveals approaches that could be labelled landscape architecture specific....

  13. The Management of Dissonance in Nature Restoration

    Clemmensen, Thomas Juel

    2014-01-01

    Nature restoration is far from a neural undertaking. Just like any other type of heritage production, it can be the source of dissonance—‘our’ nature is not necessary ‘their’ nature. Often this dissonance is managed in ways, which are not particularly sensitive to site-specificity. As exemplified...... for multiple interpretations to coexist. Indications can be found in the Re-naturalization of River Aire (2002-2015)—a restoration project, which reveals approaches that could be labelled landscape architecture specific....

  14. Restoration techniques for Sphagnum-dominated peatlands

    Ferland, C.; Rochefort, L. [Laval University, Sainte-Foy, PQ (Canada). Department of Phytology

    1997-07-01

    After peat harvesting, peat mosses do not usually recolonize the abandoned site. The purpose of this study is to develop techniques for restoring peatlands. Sphagnum diaspores from natural peatlands were introduced to exploited peatlands. The influence of microrelief, of planting companion species with the Sphagnum, and of light phosphorus fertilization on establishment of a peat moss carpet are examined. The results show that Sphagnum diaspores can be reintroduced on bare peat surfaces. The restoration method is combined with techniques to improve substrata moisture conditions, such as creation of surface roughness and the use of companion plant species. 32 refs., 6 figs., 3 tabs.

  15. The potential of territory in ecological restoration. The use of GIS tools for ecological restoration prioritization

    Corzo Ramirez, Liliana; Jerena, Erik; Rubio Mendoza, Rodrigo

    2012-01-01

    This paper develops a proposal for interdisciplinary dialogue through the use of GIS (Geographic Information System) tools for the construction of a methodology to identify the ecological restoration potential ERP in urban edge areas that are part of the Main Ecological Structure of Bogota, according to land management plans. These areas subscribe their own socio-environmental problems particular to their own sign of the interaction between nature and culture. Methodological steps for identification of PER are described: biotic, physical and social characterization, identification and spatialization of variables and weighted overlay for the calculation of the final potential. Then, carry out the discussion on the scope and limitations of using GIS tools and methodological possibility for interaction between disciplines such as biology, physical geography and sociology during the process of ecological restoration.

  16. Savannah River Site's Site Specific Plan

    1991-01-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering

  17. Analysis of documentary support for environmental restoration programs in Russia

    Nechaev, A.F.; Projaev, V.V.

    1995-01-01

    Taking into account an importance of an adequate regulations for ensuring of radiological safety of the biosphere and for successful implementation of environmental restoration projects, contents of legislative and methodical documents as well as their comprehensitivity and substantiation are subjected to critical analysis. It is shown that there is much scope for further optimization of and improvements in regulatory basis both on Federal and regional levels

  18. The SCOPE Mission

    Fujimoto, M.; Tsuda, Y.; Saito, Y.; Shinohara, I.; Takashima, T.; Matsuoka, A.; Kojima, H.; Kasaba, Y.

    2009-01-01

    In order to reach the new horizon of the space physics research, the Plasma Universe, via in-situ measurements in the Earth's magnetosphere, SCOPE will perform formation flying observations combined with high-time resolution electron measurements. The simultaneous multi-scale observations by SCOPE of various plasma dynamical phenomena will enable data-based study of the key space plasma processes from the cross-scale coupling point of view. Key physical processes to be studied are magnetic reconnection under various boundary conditions, shocks in space plasma, collisionless plasma mixing at the boundaries, and physics of current sheets embedded in complex magnetic geometries. The SCOPE formation is made up of 5 spacecraft and is put into the equatorial orbit with the apogee at 30 Re (Re: earth radius). One of the spacecraft is a large mother ship which is equipped with a full suite of particle detectors including ultra-high time resolution electron detector. Among other 4 small spacecraft, one remains near (∼10 km) the mother ship and the spacecraft-pair will focus on the electron-scale physics. Others at the distance of 100∼3000 km(electron∼ion spatial scales) from the mother ship will monitor plasma dynamics surrounding the mother-daughter pair. There is lively on-going discussion on Japan-Europe international collaboration (ESA's Cross-Scale), which would certainly make better the coverage over the scales of interest and thus make the success of the mission, i.e., clarifying the multi-scale nature of the Plasma Universe, to be attained at an even higher level.

  19. Idaho National Laboratory Site Environmental Monitoring Plan

    Nordstrom, Jenifer [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Non-routine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  20. Scope selection and control

    Guglielmi, F.

    2011-01-01

    OPG is preparing for a 4-unit refurbishment program at Darlington later in this decade. Key efforts underway include the selection of the right refurbishment scope that will allow Darlington to achieve top-decile performance post-refurbishment. For this to be possible, it is imperative that (1) plant/equipment condition be well understood, (2) post-refurbishment performance objectives be clearly defined, and (3) regulatory and other risks be carefully assessed and mitigated. Significant engineering, operations and maintenance support is required to complete this phase of the project cycle.

  1. An inventory of continental U.S. terrestrial candidate ecological restoration areas based on landscape context

    James Wickham; Kurt Riitters; Peter Vogt; Jennifer Costanza; Anne Neale

    2017-01-01

    Landscape context is an important factor in restoration ecology, but the use of landscape context for site prioritization has not been as fully developed.We used morphological image processing to identify candidate ecological restoration areas based on their proximity to existing natural vegetation. We identified 1,102,720 candidate ecological restoration areas across...

  2. 78 FR 35602 - Coeur d'Alene Basin Restoration Plan, Kootenai, Shoshone and Benewah Counties, Idaho

    2013-06-13

    ... restoration of the natural resources and services injured as a result of the release of mining related... OF THE INTERIOR Bureau of Land Management Fish and Wildlife Service Coeur d'Alene Basin Restoration... Basin Restoration Plan by any of the following methods: Web site: www.restorationpartnership.org . Email...

  3. Nevada Test Site Radiation Protection Program - Revision 1

    Radiological Control Managers' Council

    2008-06-01

    Title 10 Code of Federal Regulations (CFR) Part 835, 'Occupational Radiation Protection,' establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (on-site or off-site) U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration off-site projects. This NTS RPP promulgates the radiation protection standards, limits, and program requirements for occupational exposure to ionizing radiation resulting from NNSA/NSO activities at the NTS and other operational areas as stated in 10 CFR 835.1(a). NNSA/NSO activities (including design, construction, operation, and decommissioning) within the scope of this RPP may result in occupational exposures to radiation or radioactive material. Therefore, a system of control is implemented through specific references to the site-specific NV/YMP RCM. This system of control is intended to ensure that the following criteria are met: (1) occupational exposures are maintained as low as reasonably achievable (ALARA), (2) DOE's limiting values are not exceeded, (3) employees are aware of and are prepared to cope with emergency conditions, and (4) employees are not inadvertently exposed to radiation or radioactive material.

  4. Nevada Test Site Radiation Protection Program - Revision 1

    Nevada Test Site Radiological Control Managers' Council

    2008-01-01

    Title 10 Code of Federal Regulations (CFR) Part 835, 'Occupational Radiation Protection,' establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (on-site or off-site) U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration off-site projects. This NTS RPP promulgates the radiation protection standards, limits, and program requirements for occupational exposure to ionizing radiation resulting from NNSA/NSO activities at the NTS and other operational areas as stated in 10 CFR 835.1(a). NNSA/NSO activities (including design, construction, operation, and decommissioning) within the scope of this RPP may result in occupational exposures to radiation or radioactive material. Therefore, a system of control is implemented through specific references to the site-specific NV/YMP RCM. This system of control is intended to ensure that the following criteria are met: (1) occupational exposures are maintained as low as reasonably achievable (ALARA), (2) DOE's limiting values are not exceeded, (3) employees are aware of and are prepared to cope with emergency conditions, and (4) employees are not inadvertently exposed to radiation or radioactive material

  5. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-14

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

  6. Site Characterization Work Plan for Gnome-Coach Site, New Mexico

    DOE/NV

    2001-02-13

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective

  7. Scoping Study: Networked Microgrids.

    Trinklei, Eddy; Parker, Gordon; Weaver, Wayne; Robinett, Rush; Babe Gauchia, Lucia; Ten, Chee-Wooi; Bower, Ward; Glover, Steven F.; Bukowski, Steve

    2014-10-01

    This report presents a scoping study for networked microgrids which are defined as "Interoperable groups of multiple Advanced Microgrids that become an integral part of the electricity grid while providing enhanced resiliency through self-healing, aggregated ancillary services, and real-time communication." They result in optimal electrical system configurations and controls whether grid-connected or in islanded modes and enable high penetrations of distributed and renewable energy resources. The vision for the purpose of this document is: "Networked microgrids seamlessly integrate with the electricity grid or other Electric Power Sources (EPS) providing cost effective, high quality, reliable, resilient, self-healing power delivery systems." Scoping Study: Networked Microgrids September 4, 2014 Eddy Trinklein, Michigan Technological University Gordon Parker, Michigan Technological University Wayne Weaver, Michigan Technological University Rush Robinett, Michigan Technological University Lucia Gauchia Babe, Michigan Technological University Chee-Wooi Ten, Michigan Technological University Ward Bower, Ward Bower Innovations LLC Steve Glover, Sandia National Laboratories Steve Bukowski, Sandia National Laboratories Prepared by Michigan Technological University Houghton, Michigan 49931 Michigan Technological University

  8. Survey and Restoration

    Mileto, C.; Vegas, F.

    2017-05-01

    In addition to the technological evolution over the last two centuries, survey has experienced two main conceptual leaps: the introduction of photography as a tool for an indiscriminate register for reality, and the shift from autographic to allographic survey, phenomena which can generate a distancing effect within the restoration process. Besides, this text presents the relationship between survey in its numerous forms and technologies (manual and semi-manual to more complex ones like scanner-laser) and the restoration of the building, either for establishing a diagnosis, operating or valorizating, illustrating it with examples developed by the authors, as well as the criteria to be applied when documenting a building to be restored, irrespective of the means and technology available in each case.

  9. SURVEY AND RESTORATION

    C. Mileto

    2017-05-01

    Full Text Available In addition to the technological evolution over the last two centuries, survey has experienced two main conceptual leaps: the introduction of photography as a tool for an indiscriminate register for reality, and the shift from autographic to allographic survey, phenomena which can generate a distancing effect within the restoration process. Besides, this text presents the relationship between survey in its numerous forms and technologies (manual and semi-manual to more complex ones like scanner-laser and the restoration of the building, either for establishing a diagnosis, operating or valorizating, illustrating it with examples developed by the authors, as well as the criteria to be applied when documenting a building to be restored, irrespective of the means and technology available in each case.

  10. Urban wetlands: restoration or designed rehabilitation?

    Beth Ravit

    2017-05-01

    Full Text Available The continuing loss of urban wetlands due to an expanding human population and urban development pressures makes restoration or creation of urban wetlands a high priority. However, urban wetland restorations are particularly challenging due to altered hydrologic patterns, a high proportion of impervious surface and stormwater runoff, degraded urban soils, historic contamination, and competitive pressure from non-native species. Urban wetland projects must also consider human-desired socio-economic benefits. We argue that using current wetland restoration approaches and existing regulatory “success” criteria, such as meeting restoration targets for vegetation structure based on reference sites in non-urban locations, will result in “failed” urban restorations. Using three wetland Case Studies in highly urbanized locations, we describe geophysical tools, stormwater management methods, and design approaches useful in addressing urban challenges and in supporting “successful” urban rehabilitation outcomes. We suggest that in human-dominated landscapes, the current paradigm of “restoration” to a previous state must shift to a paradigm of “rehabilitation”, which prioritizes wetland functions and values rather than vegetation structure in order to provide increased ecological benefits and much needed urban open space amenities.

  11. 15 CFR 990.55 - Restoration selection-developing restoration plans.

    2010-01-01

    ... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Restoration Planning Phase § 990.55... success or the need for corrective action, and whether monitoring of a reference or control site is needed...

  12. Topical Day on Site Remediation

    Vandenhove, H [ed.

    1996-09-18

    Ongoing activities at the Belgian Nuclear Research Centre relating to site remediation and restoration are summarized. Special attention has been paid to the different phases of remediation including characterization, impact assessment, evaluation of remediation actions, and execution of remediation actions.

  13. Scope of strategic marketing

    Bradley Frank

    2004-01-01

    Full Text Available Marketing is a philosophy that leads to the process by which organizations, groups and individuals obtain what they need and want by identifying value, providing it, communicating it and delivering it to others. The core concepts of marketing are customers needs, wants and values; products, exchange, communications and relationships. Marketing is strategically concerned with the direction and scope of the long-term activities performed by the organization to obtain a competitive advantage. The organization applies its resources within a changing environment to satisfy customer needs while meeting stakeholder expectations. Implied in this view of strategic marketing is the requirement to develop a strategy to cope with competitors, identify market opportunities, develop and commercialize new products and services, allocate resources among marketing activities and design an appropriate organizational structure to ensure the perform once desired is achieved.

  14. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Summary

    1996-08-01

    This sitewide EIS evaluates the potential environmental impacts of four possible land-use alternatives being considered for the Nevada Test Site (NTS), the Tonopah Test Range, and the formerly operated DOE sites in the state of Nevada: the Project Shoal Area, the Central Nevada Test Area, and portions of the Nellis Air Force Range Complex. Three additional sites in Nevada-Eldorado Valley, Dry Lake Valley, and Coyote Spring Valley-are evaluated for collocation of solar energy production facilities. The four alternatives include Continue Current Operations (No Action, continue to operate at the level maintained for the past 3 to 5 years); Discontinue Operations 1 (discontinue operations and interagency programs); Expanded Use (increased use of NTS and its resources to support defense and nondefense programs); and Alternate Use of Withdrawn Lands (discontinue all defense-related activities at NTS; continue waste management operations in support of NTS environmental restoration efforts; expand nondefense research). Environmental impacts were assessed for each alternative by analyzing, to the extent possible, the discrete and cumulative environmental impacts associated with Defense Waste Management, Environmental Restoration, Nondefense Research and Development, and Work for Others Programs. A framework for a Resource Management Plan is included as Volume 2 of this EIS and represents the development of an ecosystem based planning process closely integrated with the National Environmental Policy Act process. This EIS, among other things, analyzed the impacts of transportation of low level waste, and site characterization activities related to the Yucca Mountain Project but did not analyze the suitability of the site as a repository. This EIS does not analyze the suitability of the Yucca Mountain site as a repository as this is an action beyond the scope of the EIS. Volume 3 of this EIS contains the public comments and the responses to the comments

  15. Restorative justice and victimology

    The growth of restorative justice has sparked debate over the future of the criminal justice system, which has historically adopted a retributive, punitive philosophy and advocated for an individualistic, treatment-orientated approach. This approach has over time failed to address the needs of crime victims, communities and.

  16. Restoration of contaminated soils

    Miranda J, Jose Eduardo

    2009-01-01

    A great variety of techniques are used for the restoration of contaminated soils. The contamination is present by both organic and inorganic pollutants. Environmental conditions and soil characteristics should take into account in order to implement a remedial technique. The bioremediation technologies are showed as help to remove a variety of soil contaminants. (author) [es

  17. Restoration in South Africa

    Blignaut, J

    2010-01-01

    Full Text Available Restoration can provide a wide range of direct and indirect benefits to society. However, there are very few projects that have attempted to properly quantify those benefits and present them in such a way that society is motivated to invest...

  18. Fusion facility siting considerations

    Bussell, G.T.

    1985-01-01

    Inherent in the fusion program's transition from hydrogen devices to commercial power machines is a general increase in the size and scope of succeeding projects. This growth will lead to increased emphasis on safety, environmental impact, and the external effects of fusion in general, and of each new device in particular. A critically important consideration in this regard is site selection. The purpose of this paper is to examine major siting issues that may affect the economics, safety, and environmental impact of fusion

  19. Uranium mining environmental restoration project (PRAMU)

    Asenjo, A.

    2002-01-01

    The National Atomic Energy Commission (CNEA) started its activities 50 years ago and obtained significant results. At the present time, the CNEA is defined as an Institution of research and development in the nuclear field. It is also responsible for the management of radioactive wastes and the dismantling of nuclear and radioactive facilities. Mining and milling activities have been carried out during the past 40 years and at present the CNEA is undertaking the Uranium Mining Environmental Restoration Project (PRAMU). The aim of this project is to restore the environment as much as is possible in all places where uranium mining and milling activities were developed when taking into consideration both economic and technical reality. First, the characteristics of the problems in each site are determined through appropriate studies which identify the existing or potential impacts, the possible pathways of contamination, etc. The sites being studied are: MALARGUE (Mendoza Province), CORDOBA (Cordoba Province), LOS GIGANTES (Cordoba Province), HUEMUL (Mendoza Province), PICHINAN (Chubut Province), TONCO (Salta Province), LA ESTELA (San Luis Province), LOS COLORADOS (La Rioja Province). PRAMU seeks to improve the current conditions of the tailings deposits and mines and to ensure the long term protection of people and the environment. The CNEA is required to comply with all legislation that is in force and is under the control of various national, provincial and local State institutions. The main objectives of the project for the various sites are: (a) Malargue site: to implement the actions necessary for environmental restoration and management of the tailings derived from the uranium ores processed in the industrial plant; (b) Cordoba and Los Gigantes sites: to design, engineer and execute the activities required for closure of the sites; (c) Other sites (Huemul, Pichinan, Tonco, La Estela, Los Colorados): to develop an environmental evaluation and, on the basis of

  20. Savannah River Site Environmental Report for 1997

    Arnett, M.W.; Mamatey, A.R. [eds.

    1998-08-01

    The mission at the Savannah River Site has changed from the production of nuclear weapons materials for national defense to the management of waste, restoration of the environment, and the development of industry in and around the site.

  1. Savannah River Site Environmental Report for 1997

    Arnett, M.W.; Mamatey, A.R.

    1998-01-01

    The mission at the Savannah River Site has changed from the production of nuclear weapons materials for national defense to the management of waste, restoration of the environment, and the development of industry in and around the site

  2. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG ampersand G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP

  3. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  4. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  5. Predicting environmental restoration activities through static simulation

    Ross, T.L.; King, D.A.; Wilkins, M.L.; Forward, M.F.

    1994-12-01

    This paper discusses a static simulation model that predicts several performance measures of environmental restoration activities over different remedial strategies. Basic model operation consists of manipulating and processing waste streams via selecting and applying remedial technologies according to the strategy. Performance measure prediction is possible for contaminated soil, solid waste, surface water, groundwater, storage tank, and facility sites. Simulations are performed for the U.S. Department of Energy in support of its Programmatic Environmental Impact Statement

  6. Factors for formulating strategies for environmental restoration

    1998-07-01

    This publication focusses on factors which are important for formulating a strategy for environmental restoration. In parallel to this effort, the IAEA has conducted activities in related areas which have been reported in companion reports dealing with (1) the characterization of radioactively contaminated sites for remediation purposes and (2) available technology for cleanup and remediation of radioactively contaminated sites. Additionally, follow-up activities will focus on two other areas, viz. planning and management options for cleanup of contaminated groundwater, and post-restoration monitoring of decommissioned sites. In a separate initiative the IAEA has developed preliminary guidance on radiological criteria for determining when cleanup action is needed and for deciding on when areas have been cleaned up to a sufficient extent. It is also concerned with radioactive contamination of soils, groundwaters, structures and biota which may have the potential for harm to people. It is intended that it will serve as an important source of information and data on the key factors to be considered in the formulation of an environmental restoration strategy

  7. HEIS: An integrated information system for environmental restoration and monitoring at Hanford

    Tzemos, S.; Kissinger, B.

    1991-11-01

    The US Department of Energy`s Hanford Site has about 1500 waste sites that contain a complex mixture of chemical and radioactive contaminants. After many years of environmental monitoring to assess the impact of Hanford operations to the environment, the Site`s mission is shifting to environmental restoration. The Hanford Environmental Information System (HEIS) is being developed to provide advanced tools to (1) support environmental restoration and routine site-wide monitoring, and (2) aid the scientists in understanding and conducting the restoration efforts. This paper describes some of the highlights and distinctive features of HEIS.

  8. Restoration treatments in urban park forests drive long-term changes in vegetation trajectories.

    Johnson, Lea R; Handel, Steven N

    2016-04-01

    Municipalities are turning to ecological restoration of urban forests as a measure to improve air quality, ameliorate urban heat island effects, improve storm water infiltration, and provide other social and ecological benefits. However, community dynamics following urban forest restoration treatments are poorly documented. This study examines the long-term effects of ecological restoration undertaken in New York City, New York, USA, to restore native forest in urban park natural areas invaded by woody non-native plants that are regional problems. In 2009 and 2010, we sampled vegetation in 30 invaded sites in three large public parks that were restored 1988-1993, and 30 sites in three large parks that were similarly invaded but had not been restored. Data from these matched plots reveal that the restoration treatment achieved its central goals. After 15-20 years, invasive species removal followed by native tree planting resulted in persistent structural and compositional shifts, significantly lower invasive species abundance, a more complex forest structure, and greater native tree recruitment. Together, these findings indicate that successional trajectories of vegetation dynamics have diverged between restored forests and invaded forests that were not restored. In addition, the data suggest that future composition of these urban forest patches will be novel assemblages. Restored and untreated sites shared a suite of shade-intolerant, quickly-growing tree species that colonize disturbed sites, indicating that restoration treatments created sites hospitable for germination and growth of species adapted to high light conditions and disturbed soils. These findings yield an urban perspective on the use of succession theory in ecological restoration. Models of ecological restoration developed in more pristine environments must be modified for use in cities. By anticipating both urban disturbances and ecological succession, management of urban forest patches can be

  9. Long-term competence restoration.

    Morris, Douglas R; DeYoung, Nathaniel J

    2014-01-01

    While the United States Supreme Court's Jackson v. Indiana decision and most state statutes mandate determinations of incompetent defendants' restoration probabilities, courts and forensic clinicians continue to lack empirical evidence to guide these determinations and do not yet have a consensus regarding whether and under what circumstances incompetent defendants are restorable. The evidence base concerning the restoration likelihood of those defendants who fail initial restoration efforts is even further diminished and has largely gone unstudied. In this study, we examined the disposition of a cohort of defendants who underwent long-term competence restoration efforts (greater than six months) and identified factors related to whether these defendants were able to attain restoration and adjudicative success. Approximately two-thirds (n = 52) of the 81 individuals undergoing extended restoration efforts were eventually deemed restored to competence. Lengths of hospitalization until successful restoration are presented with implications for the reasonable length of time that restoration efforts should persist. Older individuals were less likely to be restored and successfully adjudicated, and individuals with more severe charges and greater factual legal understanding were more likely to be restored and adjudicated. The significance of these findings for courts and forensic clinicians is discussed.

  10. Ecosystem Restoration: Fact or Fancy?

    John A. Stanturf; Callie J. Schweitzer; Stephen H. Schoenholtz; James P. Barnett; Charles K. McMahon; Donald J. Tomszak

    1998-01-01

    Ecological restoration is generally accepted as the reestablishment of natural ecological processes that produce certain dynamic ecosystem properties of structure, function, and processes. But restore to what? The most frequently used conceptual model for the restoration process is the shift of conditions from some current (degraded) dynamic state to some past dynamic...

  11. Ecological restoration: Biodiversity and conservation

    Vargas Rios, Orlando

    2011-01-01

    In this essay the principal concepts and methods applied on projects aimed at ecological restoration are reviewed, with emphasis on the relationship between conservation, biodiversity and restoration. The most common definitions are provided and the steps to take into account to develop projects on ecological restoration, which will be determined by the level of degradation of the ecosystem to be intervened.

  12. Assessing the carbon benefit of saltmarsh restoration

    Taylor, Benjamin; Paterson, David; Hanley, Nicholas

    2016-04-01

    The quantification of carbon sequestration rates in coastal ecosystems is required to better realise their potential role in climate change mitigation. Through accurate valuation this service can be fully appreciated and perhaps help facilitate efforts to restore vulnerable ecosystems such as saltmarshes. Vegetated coastal ecosystems are suggested to account for approximately 50% of oceanic sedimentary carbon despite their 2% areal extent. Saltmarshes, conservatively estimated to store 430 ± 30 Tg C in surface sediment deposits, have experienced extensive decline in the recent past; through processes such as land use change and coastal squeeze. Saltmarsh habitats offer a range of services that benefit society and the natural world, making their conservation meaningful and beneficial. The associated costs of restoration projects could, in part, be subsidised through payment for ecosystem services, specifically Blue carbon. Additional storage is generated through the (re)vegetation of mudflat areas leading to an altered ecosystem state and function; providing similar benefits to natural saltmarsh areas. The Eden Estuary, Fife, Scotland has been a site of saltmarsh restoration since 2000; providing a temporal and spatial scale to evaluate these additional benefits. The study is being conducted to quantify the carbon benefit of restoration efforts and provide an insight into the evolution of this benefit through sites of different ages. Seasonal sediment deposition and settlement rates are measured across the estuary in: mudflat, young planted saltmarsh, old planted saltmarsh and extant high marsh areas. Carbon values being derived from loss on ignition organic content values. Samples are taken across a tidal cycle on a seasonal basis; providing data on tidal influence, vegetation condition effects and climatic factors on sedimentation and carbon sequestration rates. These data will inform on the annual characteristics of sedimentary processes in the estuary and be

  13. Research and development for DOE environmental restoration and waste management

    Erickson, M.D.; Borys, S.S.; Bugielski, D.; Lien, S.C.T.; Hain, K.E.

    1991-01-01

    The US Department of Energy (DOE) recently consolidated its environmental restoration and waste management activities. Within that new organization, DOE has committed to support Research, Development, Demonstration, Testing and Evaluation (RDDT ampersand E) activities with the following objectives: rapidly advance beyond currently available technologies; provide solutions to key technical issues that will improve effectiveness, efficiency, and safety; and enhance DOE's ability to meet its 30-year compliance and cleanup goals. DOE has already supported a number of R ampersand D activities in this area and plans to continue that support in the future. DOE's Office of Technology Development is interested in eliciting broad participation from qualified organizations who can contribute to RDDT ampersand E activities. This presentation addresses the on-going and future R ampersand D, with an emphasis on the private sector activities. To focus private sector capabilities on the high-priority needs of DOE, a series of competitive solicitations was started in FY 1990. On May 1, 1990, on behalf of DOE's Office of Technology Development, Argonne National Laboratory issued a Request for Proposals that solicited proposals for research and development in the areas of (1) groundwater remediation, (2) soil remediation, (3) characterization of contamination and geological and hydrological features, and (4) containment of contaminated sites. In response to this solicitation, Argonne National Laboratory received 147 proposals. Fifteen of the proposals totaling $5.7 million were funded in FY 1990. The scope of work and evaluation criteria used in the procurement and the workscope of the resultant contracts are reviewed in this paper. The FY 1991 plans for competitive private sector research and development activities will also be presented at the conference. Funding levels, technical workscope, evaluation criteria, and schedule for the FY 1991 Request for Proposals will be detailed. 2

  14. Clinical decisions for anterior restorations: the concept of restorative volume.

    Cardoso, Jorge André; Almeida, Paulo Júlio; Fischer, Alex; Phaxay, Somano Luang

    2012-12-01

    The choice of the most appropriate restoration for anterior teeth is often a difficult decision. Numerous clinical and technical factors play an important role in selecting the treatment option that best suits the patient and the restorative team. Experienced clinicians have developed decision processes that are often more complex than may seem. Less experienced professionals may find difficulties making treatment decisions because of the widely varied restorative materials available and often numerous similar products offered by different manufacturers. The authors reviewed available evidence and integrated their clinical experience to select relevant factors that could provide a logical and practical guideline for restorative decisions in anterior teeth. The presented concept of restorative volume is based on structural, optical, and periodontal factors. Each of these factors will influence the short- and long-term behavior of restorations in terms of esthetics, biology, and function. Despite the marked evolution of esthetic restorative techniques and materials, significant limitations still exist, which should be addressed by researchers. The presented guidelines must be regarded as a mere orientation for risk analysis. A comprehensive individual approach should always be the core of restorative esthetic treatments. The complex decision process for anterior esthetic restorations can be clarified by a systematized examination of structural, optical, and periodontal factors. The basis for the proposed thought process is the concept of restorative volume that is a contemporary interpretation of restoration categories and their application. © 2012 Wiley Periodicals, Inc.

  15. Restoring proximal caries lesions conservatively with tunnel restorations

    Chu CH

    2013-07-01

    Full Text Available Chun-Hung Chu1, May L Mei,1 Chloe Cheung,1 Romesh P Nalliah2 1Faculty of Dentistry, The University of Hong Kong, Hong Kong, People's Republic of China; 2Department of Restorative Dentistry and Biomaterials Sciences, Harvard School of Dental Medicine, Boston, MA, USA Abstract: The tunnel restoration has been suggested as a conservative alternative to the conventional box preparation for treating proximal caries. The main advantage of tunnel restoration over the conventional box or slot preparation includes being more conservative and increasing tooth integrity and strength by preserving the marginal ridge. However, tunnel restoration is technique-sensitive and can be particularly challenging for inexperienced restorative dentists. Recent advances in technology, such as the contemporary design of dental handpieces with advanced light-emitting diode (LED and handheld comfort, offer operative dentists better vision, illumination, and maneuverability. The use of magnifying loupes also enhances the visibility of the preparation. The advent of digital radiographic imaging has improved dental imaging and reduced radiation. The new generation of restorative materials has improved mechanical properties. Tunnel restoration can be an option to restore proximal caries if the dentist performs proper case selection and pays attention to the details of the restorative procedures. This paper describes the clinical technique of tunnel restoration and reviews the studies of tunnel restorations. Keywords: operative, practice, tunnel preparation, composite, amalgam, glass ionomer

  16. Restoration of longitudinal images.

    Hu, Y; Frieden, B R

    1988-01-15

    In this paper, a method of restoring longitudinal images is developed. By using the transfer function for longitudinal objects, and inverse filtering, a longitudinal image may be restored. The Fourier theory and sampling theorems for transverse images cannot be used directly in the longitudinal case. A modification and reasonable approximation are introduced. We have numerically established a necessary relationship between just-resolved longitudinal separation (after inverse filtering), noise level, and the taking conditions of object distance and lens diameter. An empirical formula is also found to well-fit the computed results. This formula may be of use for designing optical systems which are to image longitudinal details, such as in robotics or microscopy.

  17. Relativistic Linear Restoring Force

    Clark, D.; Franklin, J.; Mann, N.

    2012-01-01

    We consider two different forms for a relativistic version of a linear restoring force. The pair comes from taking Hooke's law to be the force appearing on the right-hand side of the relativistic expressions: d"p"/d"t" or d"p"/d["tau"]. Either formulation recovers Hooke's law in the non-relativistic limit. In addition to these two forces, we…

  18. A Hoseus Banjo Restoration

    Politzer, David

    2016-01-01

    Intrigued by the sound of another recently restored example, I attempted to bring a sadly abused, bottom-of-the-line, Hoseus-equipped banjo up to playable condition. Reminders, lessons learned, and the joy of (albeit crude) handiwork made it well- worth the purchase price. The actual sound and physics of the Hoseus contraption remain hidden in the complex interaction of the various parts, as demonstrated by the accompanying sound samples.

  19. Networked Microgrids Scoping Study

    Backhaus, Scott N. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dobriansky, Larisa [General MicroGrids, San Diego, CA (United States); Glover, Steve [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Liu, Chen-Ching [Washington State Univ., Pullman, WA (United States); Looney, Patrick [Brookhaven National Lab. (BNL), Upton, NY (United States); Mashayekh, Salman [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Pratt, Annabelle [National Renewable Energy Lab. (NREL), Golden, CO (United States); Schneider, Kevin [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Starke, Michael [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wang, Jianhui [Argonne National Lab. (ANL), Argonne, IL (United States); Yue, Meng [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2016-12-05

    Much like individual microgrids, the range of opportunities and potential architectures of networked microgrids is very diverse. The goals of this scoping study are to provide an early assessment of research and development needs by examining the benefits of, risks created by, and risks to networked microgrids. At this time there are very few, if any, examples of deployed microgrid networks. In addition, there are very few tools to simulate or otherwise analyze the behavior of networked microgrids. In this setting, it is very difficult to evaluate networked microgrids systematically or quantitatively. At this early stage, this study is relying on inputs, estimations, and literature reviews by subject matter experts who are engaged in individual microgrid research and development projects, i.e., the authors of this study The initial step of the study gathered input about the potential opportunities provided by networked microgrids from these subject matter experts. These opportunities were divided between the subject matter experts for further review. Part 2 of this study is comprised of these reviews. Part 1 of this study is a summary of the benefits and risks identified in the reviews in Part 2 and synthesis of the research needs required to enable networked microgrids.

  20. Aerodynamic Drag Scoping Work.

    Voskuilen, Tyler [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Erickson, Lindsay Crowl [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Knaus, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-02-01

    This memo summarizes the aerodynamic drag scoping work done for Goodyear in early FY18. The work is to evaluate the feasibility of using Sierra/Low-Mach (Fuego) for drag predictions of rolling tires, particularly focused on the effects of tire features such as lettering, sidewall geometry, rim geometry, and interaction with the vehicle body. The work is broken into two parts. Part 1 consisted of investigation of a canonical validation problem (turbulent flow over a cylinder) using existing tools with different meshes and turbulence models. Part 2 involved calculating drag differences over plate geometries with simple features (ridges and grooves) defined by Goodyear of approximately the size of interest for a tire. The results of part 1 show the level of noise to be expected in a drag calculation and highlight the sensitivity of absolute predictions to model parameters such as mesh size and turbulence model. There is 20-30% noise in the experimental measurements on the canonical cylinder problem, and a similar level of variation between different meshes and turbulence models. Part 2 shows that there is a notable difference in the predicted drag on the sample plate geometries, however, the computational cost of extending the LES model to a full tire would be significant. This cost could be reduced by implementation of more sophisticated wall and turbulence models (e.g. detached eddy simulations - DES) and by focusing the mesh refinement on feature subsets with the goal of comparing configurations rather than absolute predictivity for the whole tire.

  1. The fuel cycle scoping system

    Dooley, G.D.; Malone, J.P.

    1986-01-01

    The Fuel Cycle Scoping System (FCSS) was created to fill the need for a scoping tool which provides the utilities with the ability to quickly evaluate alternative fuel management strategies, tails assay choices, fuel fabrication quotes, fuel financing alternatives, fuel cycle schedules, and other fuel cycle perturbations. The FCSS was specifically designed for PC's that support dBASE-III(TM), a relational data base software system by Ashton-Tate. However, knowledge of dBASE-III is not necessary in order to utilize the FCSS. The FCSS is menu driven and can be utilized as a teaching tool as well as a scoping tool

  2. Multiscale analysis of restoration priorities for marine shoreline planning.

    Diefenderfer, Heida L; Sobocinski, Kathryn L; Thom, Ronald M; May, Christopher W; Borde, Amy B; Southard, Susan L; Vavrinec, John; Sather, Nichole K

    2009-10-01

    Planners are being called on to prioritize marine shorelines for conservation status and restoration action. This study documents an approach to determining the management strategy most likely to succeed based on current conditions at local and landscape scales. The conceptual framework based in restoration ecology pairs appropriate restoration strategies with sites based on the likelihood of producing long-term resilience given the condition of ecosystem structures and processes at three scales: the shorezone unit (site), the drift cell reach (nearshore marine landscape), and the watershed (terrestrial landscape). The analysis is structured by a conceptual ecosystem model that identifies anthropogenic impacts on targeted ecosystem functions. A scoring system, weighted by geomorphic class, is applied to available spatial data for indicators of stress and function using geographic information systems. This planning tool augments other approaches to prioritizing restoration, including historical conditions and change analysis and ecosystem valuation.

  3. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement; Volume 1, Appendix F, Nevada Test Site and Oak Ridge Reservation Spent Nuclear Fuel Management Programs

    NONE

    1994-06-01

    This volume addresses the interim storage of spent nuclear fuel (SNF) at two US Department of Energy sites, the Nevada Test Site (NTS) and the Oak Ridge Reservation (ORR). These sites are being considered to provide a reasonable range of alternative settings at which future SNF management activities could be conducted. These locations are not currently involved in management of large quantities of SNF; NTS has none, and ORR has only small quantities. But NTS and ORR do offer experience and infrastructure for the handling, processing and storage of radioactive materials, and they do exemplify a broad spectrum of environmental parameters. This broad spectrum of environmental parameters will provide, a perspective on whether and how such location attributes may relate to potential environmental impacts. Consideration of these two sites will permit a programmatic decision to be based upon an assessment of the feasible options without bias, to the current storage sites. This volume is divided into four parts. Part One is the volume introduction. Part Two contains chapters one through five for the NTS, as well as references contained in chapter six. Part Three contains chapters one through five for the ORR, as well as references contained in chapter six. Part Four is summary information including the list of preparers, organizations contacted, acronyms, and abbreviations for both the NTS and the ORR. A Table of Contents, List of Figures, and List of Tables are included in parts Two, Three, and Four. This approach permitted the inclusion of both sites in one volume while maintaining consistent chapter numbering.

  4. 77 FR 21721 - Sierra National Forest, Bass Lake Ranger District, California, Whisky Ecosystem Restoration Project

    2012-04-11

    ... and vigor of conifer stands, reduce the spread and intensity of wildfires within and outside of the Wildland Urban Interface (WUI) and restore other ecological processes. DATES: Comments concerning the scope... on these federal and formerly private lands, combined with the exclusion of fire, have altered forest...

  5. Setting standards of restorative justice

    Kostić Miomira

    2007-01-01

    Full Text Available In the article the author deals with the basic theoretical statements and discussions about the practical use of restorative justice. She discusses the questions of introducing and application of restorative justice in order to reach the balance of interests between a victim, society and a delinquent. There is no unique statement about the restorative justice concept, so the authors make this concept by listing certain activities with rispect of standards and principles. Also she emphasizes the values of restorative justice process. A part of the article is dedicated to the standards for restorative justice that are harmonized with the international documents of human rights. .

  6. Structural and functional loss in restored wetland ecosystems.

    David Moreno-Mateos

    2012-01-01

    Full Text Available Wetlands are among the most productive and economically valuable ecosystems in the world. However, because of human activities, over half of the wetland ecosystems existing in North America, Europe, Australia, and China in the early 20th century have been lost. Ecological restoration to recover critical ecosystem services has been widely attempted, but the degree of actual recovery of ecosystem functioning and structure from these efforts remains uncertain. Our results from a meta-analysis of 621 wetland sites from throughout the world show that even a century after restoration efforts, biological structure (driven mostly by plant assemblages, and biogeochemical functioning (driven primarily by the storage of carbon in wetland soils, remained on average 26% and 23% lower, respectively, than in reference sites. Either recovery has been very slow, or postdisturbance systems have moved towards alternative states that differ from reference conditions. We also found significant effects of environmental settings on the rate and degree of recovery. Large wetland areas (>100 ha and wetlands restored in warm (temperate and tropical climates recovered more rapidly than smaller wetlands and wetlands restored in cold climates. Also, wetlands experiencing more (riverine and tidal hydrologic exchange recovered more rapidly than depressional wetlands. Restoration performance is limited: current restoration practice fails to recover original levels of wetland ecosystem functions, even after many decades. If restoration as currently practiced is used to justify further degradation, global loss of wetland ecosystem function and structure will spread.

  7. Closure Report for Corrective Action Unit 124, Storage Tanks, Nevada Test Site, Nevada with Errata Sheet, Revision 0

    Alfred Wickline

    2008-01-01

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 124, Storage Tanks, Nevada Test Site (NTS), Nevada. This report complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended January 2007). This CR provides documentation and justification for the closure of CAU 124 without further corrective action. This justification is based on process knowledge and the results of the investigative activities conducted in accordance with the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 124: Storage Tanks, Nevada Test Site, Nevada (NNSA/NSO, 2007). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. Therefore, this information will not be repeated in this CR.

  8. Environmental restoration remedial action quality assurance requirements document

    Cote, R.F.

    1991-01-01

    The environmental Restoration Remedial Action Quality Assurance Requirements Document (DOE/RL 90-28) defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site, Richland, Washington. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency

  9. Richland Environmental Restoration Project management action process document

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  10. Richland Environmental Restoration Project management action process document

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  11. DOE model conference on waste management and environmental restoration

    1990-01-01

    Reports dealing with current topics in waste management and environmental restoration were presented at this conference in six sessions. Session 1 covered the Hot Topics'' including regulations and risk assessment. Session 2 dealt with waste reduction and minimization; session 3 dealt with waste treatment and disposal. Session 4 covered site characterization and analysis. Environmental restoration and associated technologies wee discussed in session 5 and 6. Individual papers have been cataloged separately.

  12. DOE model conference on waste management and environmental restoration

    1990-01-01

    Reports dealing with current topics in waste management and environmental restoration were presented at this conference in six sessions. Session 1 covered the ''Hot Topics'' including regulations and risk assessment. Session 2 dealt with waste reduction and minimization; session 3 dealt with waste treatment and disposal. Session 4 covered site characterization and analysis. Environmental restoration and associated technologies wee discussed in session 5 and 6. Individual papers have been cataloged separately

  13. Department of Energy Programmatic Environmental Impact Statement (PEIS) scoping session

    1992-01-01

    The purpose of this programmatic environmental impact statement (PEIS) scoping meeting was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get the Durango community's input. This report contains the presentations made by the project manager for the uranium mill tailings program, site manager for the Durango UMTRA site, manager of ground water hydrology, and includes comments made by local residents

  14. Image restoration, uncertainty, and information.

    Yu, F T

    1969-01-01

    Some of the physical interpretations about image restoration are discussed. From the theory of information the unrealizability of an inverse filter can be explained by degradation of information, which is due to distortion on the recorded image. The image restoration is a time and space problem, which can be recognized from the theory of relativity (the problem of image restoration is related to Heisenberg's uncertainty principle in quantum mechanics). A detailed discussion of the relationship between information and energy is given. Two general results may be stated: (1) the restoration of the image from the distorted signal is possible only if it satisfies the detectability condition. However, the restored image, at the best, can only approach to the maximum allowable time criterion. (2) The restoration of an image by superimposing the distorted signal (due to smearing) is a physically unrealizable method. However, this restoration procedure may be achieved by the expenditure of an infinite amount of energy.

  15. Adaptive restoration of river terrace vegetation through iterative experiments

    Dela Cruz, Michelle P.; Beauchamp, Vanessa B.; Shafroth, Patrick B.; Decker, Cheryl E.; O’Neil, Aviva

    2014-01-01

    Restoration projects can involve a high degree of uncertainty and risk, which can ultimately result in failure. An adaptive restoration approach can reduce uncertainty through controlled, replicated experiments designed to test specific hypotheses and alternative management approaches. Key components of adaptive restoration include willingness of project managers to accept the risk inherent in experimentation, interest of researchers, availability of funding for experimentation and monitoring, and ability to restore sites as iterative experiments where results from early efforts can inform the design of later phases. This paper highlights an ongoing adaptive restoration project at Zion National Park (ZNP), aimed at reducing the cover of exotic annual Bromus on riparian terraces, and revegetating these areas with native plant species. Rather than using a trial-and-error approach, ZNP staff partnered with academic, government, and private-sector collaborators to conduct small-scale experiments to explicitly address uncertainties concerning biomass removal of annual bromes, herbicide application rates and timing, and effective seeding methods for native species. Adaptive restoration has succeeded at ZNP because managers accept the risk inherent in experimentation and ZNP personnel are committed to continue these projects over a several-year period. Techniques that result in exotic annual Bromus removal and restoration of native plant species at ZNP can be used as a starting point for adaptive restoration projects elsewhere in the region.

  16. FedScope Accessions Cubes

    Office of Personnel Management — This raw data set provides the actual number of personnel actions ("Transfer-Ins" and "New Hires") that have taken place within a Fiscal Year. The scope of this raw...

  17. Radar Plan Position Indicator Scope

    National Oceanic and Atmospheric Administration, Department of Commerce — Radar Plan Position Indicator Scope is the collection of weather radar imagery for the period prior to the beginning of the Next Generation Radar (NEXRAD) system...

  18. Restoring proximal caries lesions conservatively with tunnel restorations.

    Chu, Chun-Hung; Mei, May L; Cheung, Chloe; Nalliah, Romesh P

    2013-07-30

    The tunnel restoration has been suggested as a conservative alternative to the conventional box preparation for treating proximal caries. The main advantage of tunnel restoration over the conventional box or slot preparation includes being more conservative and increasing tooth integrity and strength by preserving the marginal ridge. However, tunnel restoration is technique-sensitive and can be particularly challenging for inexperienced restorative dentists. Recent advances in technology, such as the contemporary design of dental handpieces with advanced light-emitting diode (LED) and handheld comfort, offer operative dentists better vision, illumination, and maneuverability. The use of magnifying loupes also enhances the visibility of the preparation. The advent of digital radiographic imaging has improved dental imaging and reduced radiation. The new generation of restorative materials has improved mechanical properties. Tunnel restoration can be an option to restore proximal caries if the dentist performs proper case selection and pays attention to the details of the restorative procedures. This paper describes the clinical technique of tunnel restoration and reviews the studies of tunnel restorations.

  19. From Cleanup to Stewardship. A companion report to Accelerating Cleanup: Paths to Closure and background information to support the scoping process required for the 1998 PEIS Settlement Study

    None, None

    1999-10-01

    Long-term stewardship is expected to be needed at more than 100 DOE sites after DOE's Environmental Management program completes disposal, stabilization, and restoration operations to address waste and contamination resulting from nuclear research and nuclear weapons production conducted over the past 50 years. From Cleanup to stewardship provides background information on the Department of Energy (DOE) long-term stewardship obligations and activities. This document begins to examine the transition from cleanup to long-term stewardship, and it fulfills the Secretary's commitment to the President in the 1999 Performance Agreement to provide a companion report to the Department's Accelerating Cleanup: Paths to Closure report. It also provides background information to support the scoping process required for a study on long-term stewardship required by a 1998 Settlement Agreement.

  20. Impact of occupational issues on DOE's environmental restoration program

    Siegel, M.R.; Lesperance, A.M.; Smith, D.

    1992-01-01

    The U.S. Department of Energy (DOE) is in the midst of a 30-yr, multi-billion-dollar environmental restoration program for most of the facilities included in its nuclear weapons complex. Long-term planning efforts are under way to identify strategies and approaches for carrying out this extraordinarily complicated task. The DOE has already entered into interagency agreements with the U.S. Environmental Protection Agency and states for many of its environmental restoration sites. These agreements set legally enforceable deadlines for cleanup activities at these sites. In addition, DOE has made other commitments to Congress and the public regarding its environmental restoration schedule. Thousands of workers will be directly involved in environmental restoration activities at DOE sites. Cleanup activity will be carried out in environments involving potential exposure to highly toxic chemical substances and radionuclides. It is inevitable that occupational safety and health (OSH) issues will become both critical and highly visible to DOE. The OSH issues associated with cleanup activities will likely attract the attention of workers, unions, the media, regulators, and the public. This paper reviews three case studies describing OSH activities in DOE's environmental restoration program. These case studies will help alert DOE officials to ways that various OSH issues should be considered when planning environmental restoration activities. This activity is being coordinated with other DOE work to identify occupational requirements that are applicable to DOE cleanup work