WorldWideScience

Sample records for site numbers construction

  1. Management of construction safety at RR site

    International Nuclear Information System (INIS)

    Pathak, B.C.; Khatsuriya, J.R.

    2016-01-01

    Construction industries are one of the most hazardous industries and hence, promotion of safety remains one of the greatest challenges facing construction industry today. According to ILO estimates: Each year at least 60,000 fatal accidents occur on construction sites around the world or one fatal accident every ten minutes. One in six fatal accidents at work occurs on a construction site. In industrialized countries, as many as 25-40 per cent of work related deaths occur on construction sites, even though the sector employs only 6-10 per cent of the workforce. The number of fatalities occurring from construction work in India is also quite disturbing. Though, the fall of person from height and through openings were the major causes for fatal /serious accidents, the risk of fatal accident involving material handling equipment, either during handling or its maintenance is also significantly high due to use of large number of material handling equipments during construction work. (author)

  2. Quality assurance during site construction

    International Nuclear Information System (INIS)

    Eymess, K.J.; Haas, R.; Wellnitz, G.

    1980-01-01

    Quality Assurance for Nuclear Power Plants under consideration of pipe assembling. Flow of Quality Requirements during: - Desing - Construction - Procurement - Prefabrication - Site. Organizational Requirements and Measurements during Erection: - Incoming Control - Material Storage - Surveillance of Tools - Weld Surveillance - Nondestructive Testing - Cleaning - Final Documentation. Qualification and Training of QA Personnel. (orig.)

  3. Studies on Labour Safety in Construction Sites

    Directory of Open Access Journals (Sweden)

    S. Kanchana

    2015-01-01

    Full Text Available Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites.

  4. Studies on Labour Safety in Construction Sites

    Science.gov (United States)

    Kanchana, S.; Sivaprakash, P.; Joseph, Sebastian

    2015-01-01

    Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites. PMID:26839916

  5. PHWR safety: design, siting and construction

    International Nuclear Information System (INIS)

    Sharma, V.K.

    2002-01-01

    In all activities associated with NPPs viz. siting, design, construction, commissioning and operation, safety is given overriding importance. The safety design principles of PHWRs are based on defence-in-depth approach, physical and functional separation between process and safety systems and also among various safety systems, redundancy to meet single failure criteria and postulation of a number of design basis events for which the plant must be designed. Apart from engineered safety systems, PHWRs have inherent characteristics which contribute to safety. In siting of a NPP, it is required to ensure that the given site does not pose undue radiological hazard to public and the environment both during normal operation as well as during and following an accident condition. For this purpose, all site related external events, both natural and man induced, are assessed for their effect on the plant and are considered as part of the design basis. Possible radiological impact of the NPP on environment and surrounding population is assessed and ensured to be within acceptable limits. During construction phase, it is essential that the NPP be built in accordance with design intent and with required quality of workmanship to ensure that the NPP will remain safe during all states of operation. This is achieved through careful execution and QA activities encompassing all aspects of component fabrication at manufacturer works, civil construction, site erection, assembly, and commissioning. Future trends in nuclear safety will continue to be based on existing principles which have proved to be sound. These will be further strengthened by features such as increasing use of passive means of performing safety functions and a more explicit treatment of severe accidents. (author)

  6. Turbidity monitoring at select MDOT construction sites.

    Science.gov (United States)

    2012-06-01

    The objective of this project was to establish baseline turbidity conditions at select construction : sites by establishing a water quality monitoring program and documenting MDOT approved : BMPs on site. In 2009 the United States Environmental Prote...

  7. Efficient on-site construction

    DEFF Research Database (Denmark)

    Thuesen, Christian Langhoff; Hvam, Lars

    2011-01-01

    selected market – optimising cost and value. Based on the platform, the company has managed to create a high-quality product at low cost. In fact, they have managed to reduce costs by more than 30 per cent, enabling the company to sell houses to people that normally would not be able to afford a house...... from the German platform such as: platform does not imply that “off-site manufacturing” is the most optimal production method, rather it is a matter of handling complexity; strong commitment and loyalty from the whole organization is needed; importance of having a specific customer focus (target...

  8. Quality assurance during site construction

    International Nuclear Information System (INIS)

    Dommke, J.; Jurgutat, H.

    1980-01-01

    During the time of planing and construction of a nuclear power plant, the following proceeding is approved: - the deliverer of a nuclear power plant provides the reports fixing the quality assurance program, it means that he is responsible to write the safety analysis report, the specifications for the erection of the components, the working manuals and specifications for testing (eg nondestr. testing) - the manufacturing of components or systems will be controlled by an own independent quality assurance group, provided that this group was checked by the quality assurance group of the applicant - the TUeV with its independent assessors will fix the requirements relating to quality assurance in its assessment. On this basis the examination of the applicants specifications, working manuals, testing specifications will be done. The efficiency of quality assurance at the manufacturer and at the applicant will be checked by the TUeV specialists by considering specifications of modifications, repairs or tolerances. A mean point of the quality assurance in Germany is the dynamic adjustment, of an action on the latest state of engineering or science. If there exists a change of rules or guidelines, the quality assurance requirements have to be fit on this state in so far as it is feasible from the technical point of view. (orig./RW)

  9. Quality assurance during site construction. Pt. 6

    International Nuclear Information System (INIS)

    Schwarz, N.

    1980-01-01

    Scope of 'Site Construction concerning Electrical Equipment' (Installation, erection, commissioning, operation): tasks and organization of Siemens-Field Services Division; organization on site; receiving, incoming inspection and storage of material; installation, erection; (drawings, instructions, documents / execution of installation / personnel qualification). Non conformance and corrective actions; quality records; internal audits. (orig.)

  10. Prospective safety performance evaluation on construction sites.

    Science.gov (United States)

    Wu, Xianguo; Liu, Qian; Zhang, Limao; Skibniewski, Miroslaw J; Wang, Yanhong

    2015-05-01

    This paper presents a systematic Structural Equation Modeling (SEM) based approach for Prospective Safety Performance Evaluation (PSPE) on construction sites, with causal relationships and interactions between enablers and the goals of PSPE taken into account. According to a sample of 450 valid questionnaire surveys from 30 Chinese construction enterprises, a SEM model with 26 items included for PSPE in the context of Chinese construction industry is established and then verified through the goodness-of-fit test. Three typical types of construction enterprises, namely the state-owned enterprise, private enterprise and Sino-foreign joint venture, are selected as samples to measure the level of safety performance given the enterprise scale, ownership and business strategy are different. Results provide a full understanding of safety performance practice in the construction industry, and indicate that the level of overall safety performance situation on working sites is rated at least a level of III (Fair) or above. This phenomenon can be explained that the construction industry has gradually matured with the norms, and construction enterprises should improve the level of safety performance as not to be eliminated from the government-led construction industry. The differences existing in the safety performance practice regarding different construction enterprise categories are compared and analyzed according to evaluation results. This research provides insights into cause-effect relationships among safety performance factors and goals, which, in turn, can facilitate the improvement of high safety performance in the construction industry. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. Operations Management on The Construction Site

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    this as a refreshing renewal and improvement of practical operations management at the site. However this paper will present a first step of development of a new approach to operations management at the building site, which at the same time builds on, and criticize lean construction for missing the point...... of the knowledge economy. This endeavour is carried out in two ways. First by a reading of the operations management literature. Juxtaposing this with lean construction extentions and the critique developed by other scholars. And also drawing on human resource management approaches. Second through a series......” scheme. In both directions it is revealed that the human resource and knowledge element of building processes is largely left untouched by lean construction methods. It is suggested to introduce at least two more dimensions of operations management at the site than the ones offered in lean construction...

  12. Construction experience at the Canonsburg UMTRA site

    International Nuclear Information System (INIS)

    Thiers, G.R.; Farnes, L.L.; Wathen, T.R.

    1985-01-01

    Construction of on-site stabilization for over 225,000 cubic yards of abandoned uranium mill tailings in Canonsburg, Pennsylvania, began in October 1983, and is scheduled to be completed in December 1985. This paper describes selected construction experience through October 1984. The following selected events and construction items are discussed in this paper: 1. Construction and operation of a 36,000-square foot, fabric-lined sedimentation basin, including difficulties associated with installation of the liner; 2. Assembly and start-up of the contaminated water treatment plant; 3. Construction of the encapsulation cell test fills, to confirm the performance specification governing the compaction; 4. Excavation, relocation, and placement of contaminated materials, including moisture control and density testing of the radioactive materials; 5. Construction difficulties, including disposition of local leachate from the abandoned industrial complex and an increase in the volume of contaminated material to be encapsulated

  13. Quality assurance during site construction. Pt. 1

    International Nuclear Information System (INIS)

    Mueller, J.

    1980-01-01

    The first part of the lecture deals with the Quality Assurance system on the construction site in general. Basic site-related problems during contract implementation and the QA system requirements resulting from them are presented. The compilation of these requirements in a QA program and its inclusion in the site manual in written form are explained. Site organization, personnel qualification and procedures are referred to. Whereas the first part shows what is to be done, the second part shows how it can be put into practice on the site. All the essential points for the assurance of quality are addressed. They include, e.g., review of documents, incoming goods control, in-process surveillance, store controls, identification of components and systems, dealing with changes and deviations, documentation control and audits. By means of examples taken form practice the necessity of a well-functioning QA system, and the importance of quality-assuring measures on the site are pointed out. (orig.)

  14. Activities on the site during construction phase

    International Nuclear Information System (INIS)

    Fickel, O.F.

    1977-01-01

    A survey is given of the work done on the site from site-opening till turn over of the plant to the client. After a short introduction to time schedules, manpower on site, site facilities and civil work and constructions, the commissioning and trial operation phase is discussed in detail. This phase begins with finishing the assembly of individual systems and components and ends with the trial operation and the acceptance measurement. During this period the subsystems are started-up in a useful sequence, first from cold, then from hot conditions and are finally operated as a total with nuclear energy. The single steps are: a) commissioning of indivudal systems; b) hot functional test 1 (without fuels) c) baseline inspection at the reactor pressure vessel; d) hot functional test 2 (with fuels); e) preparation for first criticality; f) postcriticality test program; g) trial operation: h) acceptance measurement. (HP) [de

  15. Accident Causal Factors on the Building Construction Sites: A Review

    Directory of Open Access Journals (Sweden)

    Opeyemi Samuel Williams

    2018-01-01

    Full Text Available The concerns for cost, quality and timely delivery of projects have been in existence from time immemorial, whereas the passion for these should be extended to safe execution of site works by the construction participants, as safety of life is very paramount. However, high level of commitment that is essential for the safe execution of site works has become a taboo. Hence, a plethora of accidents takes place on the site ranging from falls from height, contact with working tools, vehicle-related, slip and trip, collapse, exposure to harmful substances, to lifting and handling object accidents. It is pertinent to know that, responsibility for accidents on site cuts across all project participants (clients, consultants, contractors, workers, as well as the construction site environment. Recognition of the construction participants and site environmental factors as agents of accident is the focus of this research. Through extensive review of literature, a copious number of factors were identified and subsequently grouped under five factors as client-related, consultant-related, contractor-related, construction workers-related, and construction site-related. However, there has been a dearth of research in the grouping of accident contributing factors. The identification and understanding of these factors will go a long way in mitigating construction accidents, coupled with proven measures taken in positively addressing them. Efforts to prevent these causative factors include inter alia elimination of hazards from design, effective safety management, adequate planning of activities and employment of seasoned professionals by the client. The contractors are to embark on staff safety auditing, set up safety committees, conduct regular training for staff, use innovative technology, uphold housekeeping and report accident occurrence, while strict adherence to safety regulations must be adopted by all construction operatives.

  16. Causes of Fall Hazards in Construction Site Management

    OpenAIRE

    Liy, Chong Hui; Ibrahim, Siti Halipah; Affandi, Rohaida; Rosli, Nor Azalina; Nawi, Mohd Nasrun Mohd

    2016-01-01

    Statistics from Occupational Safety and Health Act 1994 has shown that the number of fatality in the construction industry is 5 times more than in other sectors. The total fatalities in construction are 796 in year 2013 and out of this 796, there were 294 fall fatalities. Hence, there is an urgent need to mitigate this problem. A study has been conducted to investigate the root causes of fall hazards in construction site. Therefore, this paper is intended to identify and highlights the types ...

  17. Management of construction safety at KKNPP site

    International Nuclear Information System (INIS)

    Khare, P.K.

    2016-01-01

    Construction is considered as one of the most hazardous activities owing to the number of accidents and injuries. At KKNPP, management of industrial safety has been envisaged since the preliminary stage of construction planning, including design aspects. The governing principles of safety management are evolved from the Factories Act, 1948, the Atomic Energy(Factories) Rules, 1996, AERB safety guidelines on Control of works (2011) and Corporate HSE policy of NPCIL (2014). Numerous risk assessment and hazard control measures are adopted consistently to ensure a safe work environment during the construction, which includes Job Hazard Analysis, work permit through Computerized Maintenance Management System, safety procedures, exclusive safety training facility for the contractor's workmen, safety motivational measures, safety surveillance and reporting through Safety Related Deficiencies Management System. Assessment of efficacy of safety management system is continuously done through safety audits and observations are being circulated and discussed in committee meetings. Fire safety is also being taken care of since inception of project work. Well-equipped fire station with trained fire fighters was made available since the beginning as per AERB safety standard on fire protection system for Nuclear facilities. Fire prevention measures specific to the work are implemented during all activities. (author)

  18. Turbidity monitoring equipment and methodology evaluation at MDOT construction sites.

    Science.gov (United States)

    2014-12-01

    State Study 261 is a continuation of State study 225, "Turbidity Monitoring at Select : MDOT Construction Sites", which was successful in establishing baseline stream data : at several active construction sites. State Study 261 focused on the equipme...

  19. Confined Site Construction: A qualitative investigation of critical issues affecting management of Health and Safety

    OpenAIRE

    Spillane, John P.; Oyedele, Lukumon O.; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E.; Tijani, Iyabo K.

    2011-01-01

    The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, th...

  20. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Site layout, site-specific erection plan and construction... Steel Erection § 1926.752 Site layout, site-specific erection plan and construction sequence. (a... strength or sufficient strength to support the loads imposed during steel erection. (c) Site layout. The...

  1. BIM for Construction Site Logistics Management

    Directory of Open Access Journals (Sweden)

    K. Whitlock

    2018-01-01

    Full Text Available Emerging Building Information Modelling (BIM has been hailed as a revolutionary technology and information management process that facilitates collaboration and more efficient design and construction processes through innovative 3D modelling software, open access to information and multidisciplinary integration. The deadline of compliance to BIM level 2 on all public sector centrally procured construction projects has expired leaving many construction firms anxious to adopt BIM. Most common documented applications of BIM have been in the areas of architectural and structural design, quantity surveying, construction project management, and sustainability with very limited peer-reviewed studies on construction logistics management. The aim of this study is to investigate how BIM can be applied to construction logistics management. This study adopts a desk-top approach, with articles sources from renowned scientific databases such as ScienceDirect, Google Scholar and Emerald. The study culminated in the identification of benefits and barriers of adopting BIM for construction logistics management. Given only a desk-top approach has been used, the recommendation for future study is to build on this to conduct an empirical study using both qualitative and quantitative data. This will provide an in-depth understanding of the use of BIM for construction logistics management and open opportunities for further research.

  2. Construction Site Workers’ Awareness on Using Safety Equipment: Case Study

    OpenAIRE

    Ulang N. Md; Salim N. S.; Baharum F.; Agus Salim N.A.

    2014-01-01

    Construction sector is an important sector and contributed significantly to national development. However, this sector poses higher risk to accident. This is due to fact that construction site can be considered as a dangerous zone to workers and to the public. Due to the variety of cases occurs on site, the contractor will usually have to pay the cost related to accidents in the form of higher insurance premium. Despite various measures, accidents still occur at construction sites. Personal P...

  3. Construction plant requirements for nuclear sites

    International Nuclear Information System (INIS)

    Tatum, C.B.; Harris, J.A.

    1981-01-01

    Planning and developing the temporary construction plant facilities for a nuclear project is equivalent to providing utility services for a small city. Provision of adequate facilities is an important factor in the productivity of both the manual and non-manual work force. This paper summarizes construction facility requirements for a two unit (1300 MWe each) nuclear project. Civil, mechanical and electrical facilities are described, including design, installation and operation. Assignment of responsibility for specific work tasks regarding the construction plant is also discussed. In presenting this data, the authors seek to transfer experience and assist in the provision of adequate facilities on future projects

  4. Studies for site preparation for ITER construction

    International Nuclear Information System (INIS)

    Fardeau, A.; Blanc, F.; Cardettini, J.D.; Mandine, J.R.; Guerin, R.; Patisson, L.; Bergegere, P.; Santagiustina, A.; Garin, P.

    2004-01-01

    The implantation of a nuclear facility such as ITER (about 20 buildings on 40 ha) requires many preparatory studies, particularly with respect to: Underground characteristics; Topography, layout; Deforestation, excavations; Networks, fences and roads; Impact of seismic hazard on design. This paper presents the main results of these studies, carried out within the European ITER Site Studies framework. A dedicated paper in the conference deals with the transport studies. To choose the site for ITER implantation, detailed geological, hydrogeological and geophysical investigations have been carried out. Taking into account the meteorological data (particularly the main wind direction), topography, access, electrical supply, fluids needs and constraints (gravity systems), buildings and roads have been implemented. (authors)

  5. Quality assurance during site construction. Pt. 4

    International Nuclear Information System (INIS)

    Potrz, R.; Dilling, H.

    1980-01-01

    Quality control during the assembly of an pressure water reactor containment: 1.) Fundamental principles of the quality control: short explanation to the specification and job instruction. 2.) Quality control during the assembly: welding control, non destructive material test. 3.) Quality deviations: explanation of an repair-plan. 4.) Documentation: join together the workshop- and site documentation. (orig.)

  6. AN ASSESSMENT OF FACTORS AFFECTING MATERIAL STOCK CONTROL PRACTICE ON SELECTED CONSTRUCTION SITES IN NIGERIA

    OpenAIRE

    Adafin, Johnson Kayode; Ayodele, Elijah Olusegun; Daramola, Olufemi

    2011-01-01

    This research examines the stock control methods utilized by construction firms on construction sites with a view to assessing the factors affecting material stock control practice by construction firms as well as determining the impact of factors affecting material stock control on building project performance. Data were collected with the aid of well-structured questionnaire administered on a number of construction professionals and technicians in some randomly selected building constructio...

  7. Quantifying Construction Site Sediment Discharge Risk and Treatment Potential

    Science.gov (United States)

    Ferrell, L.; Beighley, R. E.

    2006-12-01

    Dealing with soil erosion and sediment transport can be a significant challenge during the construction process due to the potentially large spatial and temporal extent and conditions of bare soils. Best Management Practices (BMP) are commonly used to eliminate or reduce offsite discharge of sediment. However, few efforts have investigated the time varying risk of sediment discharge from construction sites, which often have dynamic soil conditions and the potential for less than optimal BMP installations. The goal of this research is to improve the design, implementation and effectiveness of sediment and erosion control at construction sites using site specific, temporal distributions of sediment discharge risk. Sediment risk is determined from individual factors leading to sediment expert, such as rainfall frequency, the adequacy of BMP installations, and the extent and duration of bare soil conditions. This research specifically focuses on quantifying: (a) the effectiveness of temporary sediment and control erosion control BMPs in preventing, containing, and/or treating construction site sediment discharge at varying levels of "proper" installation, and (b) sediment discharge potential from construction sites during different phases of construction, (ex., disturbed earth operations). BMPs are evaluated at selected construction sites in southern California and at the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with soil depths up to 1 meter, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, potential less than optimal installations, and no treatment conditions. Soil conditions are also varied to represent site conditions during different phases of construction (i.e., loose lifts

  8. Safety management system during rock blasting at FRFCF construction site

    International Nuclear Information System (INIS)

    Vijayakumaran, C.; Kandasamy, S.; Satpathy, K.K.

    2016-01-01

    Blasting is an important activity during rock excavation to reach required depth for obtaining stability of the civil structure. For the construction of various Plant Buildings of Fast Reactor Fuel Cycle Facility (FRFCF), IGCAR at Kalpakkam, based on the geological survey it is required to reach a depth of 21.4 meters from existing ground level. This paper details about the procedures and precaution adopted during the rock blasting activities at FRFCF site. The volume of rock removed by blasting was 3 lakh cubic meters. The total number of blasting carried out was 304 using 105.73 tons of blasting material. The entire blasting work could be completed within 174 days without any incident. (author)

  9. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  10. Safety leadership: application in construction site.

    Science.gov (United States)

    Cooper, Dominic

    2010-01-01

    The extant safety literature suggests that managerial Safety Leadership is vital to the success and maintenance of a behavioral safety process. The current paper explores the role of Managerial Safety Leadership behaviors in the success of a behavioral safety intervention in the Middle-East with 47,000 workers from multiple nationalities employed by fourteen sub-contractors and one main contractor. A quasi-experimental repeating ABABAB, within groups design was used. Measurement focused on managerial Safety Leadership and employee safety behaviors as well as Corrective Actions. Data was collected over 104 weeks. During this time, results show safety behavior improved by 30 percentage points from an average of 65% during baseline to an average of 95%. The site achieved 121 million man-hours free of lost-time injuries on the longest run. Stepwise multiple regression analyses indicated 86% of the variation in employee safety behavior was associated with senior, middle and front-line manager's Safety Leadership behaviors and the Corrective Action Rate. Approximately 38% of the variation in the Total Recordable Incident Rate (TRIR) was associated with the Observation rate, Corrective Action Rate and Observers Records of managerial safety leaders (Visible Ongoing Support). The results strongly suggest manager's Safety Leadership influences the success of Behavioral Safety processes.

  11. Survey dataset on occupational hazards on construction sites

    Directory of Open Access Journals (Sweden)

    Patience F. Tunji-Olayeni

    2018-06-01

    Full Text Available The construction site provides an unfriendly working conditions, exposing workers to one of the harshest environments at a workplace. In this dataset, a structured questionnaire was design directed to thirty-five (35 craftsmen selected through a purposive sampling technique on various construction sites in one of the most populous cities in sub-Saharan Africa. The set of descriptive statistics is presented with tables, stacked bar chats and pie charts. Common occupational health conditions affecting the cardiovascular, respiratory and musculoskeletal systems of craftsmen on construction sites were identified. The effects of occupational health hazards on craftsmen and on construction project performance can be determined when the data is analyzed. Moreover, contractors’ commitment to occupational health and safety (OHS can be obtained from the analysis of the survey data. Keywords: Accidents, Construction industry, Craftsmen, Health, Occupational hazards

  12. Pattern of accidents in building construction sites in Obio Akpor ...

    African Journals Online (AJOL)

    Background: Building construction workers are engaged in a dangerous job, exposing them ... The leading cause building site accidents include falls from unsafe working ... Data collected in Excel spread sheet were analyzed and presented in ...

  13. Site characterization for hybrid system construction

    Energy Technology Data Exchange (ETDEWEB)

    Saldana, R.; Miranda, U.; Medrano, M. C. [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    The basic reason to use alternative systems for electricity generation, in most cases, is the lack of electricity services, such as isolated rural communities which are located far away from the electric distribution line, and the cost of its extension is too expensive, while decentralized power systems can be an economic and appropriate solution to providing these services. Up to now there are several technological options for rural electrification using PV modules, wind plants, water-power plants, anaerobic digesters, or a combination of some of them, according to the availability of energetic resources. The applications include centralized or decentralized systems, autonomous or hybrid systems, isolated or interconnected to the electric line, etc. A particular hybrid system design can be done considering two general aspects, first it is necessary to know the electric consumption that will be supplied, taking into account present and future necessities and how local energetic resources are present in a selected site. Finally, also it is necessary to carry out an economic analysis to determine the cost of kilowatt-hour generated using local energetic resources and compare it with the cost of electricity produced by conventional power systems. [Espanol] La razon principal para el uso de sistemas alternativos de generacion de electricidad, en la mayoria de los casos, es la falta de servicios de electricidad, tal como en las comunidades rurales aisladas localizadas lejos de linea de distribucion electrica, donde el costo de su extension es demasiado caro, mientras que los sistemas descentralizados de energia pueden ser una solucion economica y adecuada para proporcionar estos servicios. Hasta ahora existen varias opciones tecnologicas para la electrificacion rural usando modulos fotovoltaicos, aerogeneradores, plantas hidroelectricas, digestores anaerobicos o una combinacion de algunos de ellos, de acuerdo con la disponibilidad de los recursos energeticos. Las

  14. Site characterization for hybrid system construction

    Energy Technology Data Exchange (ETDEWEB)

    Saldana, R; Miranda, U; Medrano, M C [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    The basic reason to use alternative systems for electricity generation, in most cases, is the lack of electricity services, such as isolated rural communities which are located far away from the electric distribution line, and the cost of its extension is too expensive, while decentralized power systems can be an economic and appropriate solution to providing these services. Up to now there are several technological options for rural electrification using PV modules, wind plants, water-power plants, anaerobic digesters, or a combination of some of them, according to the availability of energetic resources. The applications include centralized or decentralized systems, autonomous or hybrid systems, isolated or interconnected to the electric line, etc. A particular hybrid system design can be done considering two general aspects, first it is necessary to know the electric consumption that will be supplied, taking into account present and future necessities and how local energetic resources are present in a selected site. Finally, also it is necessary to carry out an economic analysis to determine the cost of kilowatt-hour generated using local energetic resources and compare it with the cost of electricity produced by conventional power systems. [Espanol] La razon principal para el uso de sistemas alternativos de generacion de electricidad, en la mayoria de los casos, es la falta de servicios de electricidad, tal como en las comunidades rurales aisladas localizadas lejos de linea de distribucion electrica, donde el costo de su extension es demasiado caro, mientras que los sistemas descentralizados de energia pueden ser una solucion economica y adecuada para proporcionar estos servicios. Hasta ahora existen varias opciones tecnologicas para la electrificacion rural usando modulos fotovoltaicos, aerogeneradores, plantas hidroelectricas, digestores anaerobicos o una combinacion de algunos de ellos, de acuerdo con la disponibilidad de los recursos energeticos. Las

  15. Effects of organizational complexity and resources on construction site risk.

    Science.gov (United States)

    Forteza, Francisco J; Carretero-Gómez, Jose M; Sesé, Albert

    2017-09-01

    Our research is aimed at studying the relationship between risk level and organizational complexity and resources on constructions sites. Our general hypothesis is that site complexity increases risk, whereas more resources of the structure decrease risk. A Structural Equation Model (SEM) approach was adopted to validate our theoretical model. To develop our study, 957 building sites in Spain were visited and assessed in 2003-2009. All needed data were obtained using a specific tool developed by the authors to assess site risk, structure and resources (Construction Sites Risk Assessment Tool, or CONSRAT). This tool operationalizes the variables to fit our model, specifically, via a site risk index (SRI) and 10 organizational variables. Our random sample is composed largely of small building sites with general high levels of risk, moderate complexity, and low resources on site. The model obtained adequate fit, and results showed empirical evidence that the factors of complexity and resources can be considered predictors of site risk level. Consequently, these results can help companies, managers of construction and regulators to identify which organizational aspects should be improved to prevent risks on sites and consequently accidents. Copyright © 2017 National Safety Council and Elsevier Ltd. All rights reserved.

  16. Mapping site-based construction workers’ motivation: Expectancy theory approach

    Directory of Open Access Journals (Sweden)

    Parviz Ghoddousi

    2014-03-01

    Full Text Available The aim of this study is to apply a recently proposed model of motivation based on expectancy theory to site-based workers in the construction context and confirm the validity of this model for the construction industry. The study drew upon data from 194 site-based construction workers in Iran to test the proposed model of motivation. To this end, the structural equation modelling (SEM approach based on the confirmatory factor analysis (CFA technique was deployed. The study reveals that the proposed model of expectancy theory incorporating five indicators (i.e. intrinsic instrumentality, extrinsic instrumentality, intrinsic valence, extrinsic valence and expectancy is able to map the process of construction workers’ motivation. Nonetheless, the findings posit that intrinsic indicators could be more effective than extrinsic ones. This proffers the necessity of construction managers placing further focus on intrinsic motivators to motivate workers. 

  17. Mapping site-based construction workers’ motivation: Expectancy theory approach

    Directory of Open Access Journals (Sweden)

    Parviz Ghoddousi

    2014-03-01

    Full Text Available The aim of this study is to apply a recently proposed model of motivation based on expectancy theory to site-based workers in the construction context and confirm the validity of this model for the construction industry. The study drew upon data from 194 site-based construction workers in Iran to test the proposed model of motivation. To this end, the structural equation modelling (SEM approach based on the confirmatory factor analysis (CFA technique was deployed. The study reveals that the proposed model of expectancy theory incorporating five indicators (i.e. intrinsic instrumentality, extrinsic instrumentality, intrinsic valence, extrinsic valence and expectancy is able to map the process of construction workers’ motivation. Nonetheless, the findings posit that intrinsic indicators could be more effective than extrinsic ones. This proffers the necessity of construction managers placing further focus on intrinsic motivators to motivate workers.

  18. Nucleic acid constructs containing orthogonal site selective recombinases (OSSRs)

    Energy Technology Data Exchange (ETDEWEB)

    Gilmore, Joshua M.; Anderson, J. Christopher; Dueber, John E.

    2017-08-29

    The present invention provides for a recombinant nucleic acid comprising a nucleotide sequence comprising a plurality of constructs, wherein each construct independently comprises a nucleotide sequence of interest flanked by a pair of recombinase recognition sequences. Each pair of recombinase recognition sequences is recognized by a distinct recombinase. Optionally, each construct can, independently, further comprise one or more genes encoding a recombinase capable of recognizing the pair of recombinase recognition sequences of the construct. The recombinase can be an orthogonal (non-cross reacting), site-selective recombinase (OSSR).

  19. Number of on-site personnel and their functions

    International Nuclear Information System (INIS)

    Recker, M.

    1986-01-01

    After the definition of the general tasks, the development of an organization chart for on-site personnel is shown, the number and qualifications are indicated relating to the specific jobs. The functions of the different people are explained in detail. (orig.)

  20. Mechanisation and automation technologies development in work at construction sites

    Science.gov (United States)

    Sobotka, A.; Pacewicz, K.

    2017-10-01

    Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.

  1. Construction Site Workers’ Awareness on Using Safety Equipment: Case Study

    Directory of Open Access Journals (Sweden)

    Ulang N. Md

    2014-01-01

    Full Text Available Construction sector is an important sector and contributed significantly to national development. However, this sector poses higher risk to accident. This is due to fact that construction site can be considered as a dangerous zone to workers and to the public. Due to the variety of cases occurs on site, the contractor will usually have to pay the cost related to accidents in the form of higher insurance premium. Despite various measures, accidents still occur at construction sites. Personal Protective Equipment (PPE is one of the important means to protect the wearer from hazards in the workplace. Since this equipment is the last frontier of the wearer from worksite hazards, it is important to select it based on the job scope and the intended protection. Therefore, this study was formulated to find out the level of knowledge and awareness of construction workers on PPE usage. It was also important to know what make the workers would want or do not want to use the PPE. It was found in this study that the level of awareness and knowledge among workers on the proper use of PPE is moderate. Construction sites accident can be further be reduced with proper implementation of PPE voluntarily by all workers.

  2. Greenhouse Gas Emissions from Excavation on Residential Construction Sites

    Directory of Open Access Journals (Sweden)

    Perry Forsythe

    2014-12-01

    Full Text Available Despite considerable research concerning the manifestation of greenhouse gases in the usage of buildings, little has been done concerning emissions arising from the construction process itself. This paper specifically examines emissions arising from cut and fill excavation on residential construction sites. Even though such excavation is often seen as being economical in terms of providing a flat base for concrete raft slab construction, the environmental consequences of this approach need to be considered more fully in terms of impact on the environment. This is particularly important when steeply sloping sites are involved and for different soil types. The paper undertakes a study that quantitatively assesses the cumulative greenhouse gas emissions caused by cut and fill excavation on 52 residential projects in Australia for a range of slope and soil types. The paper presents results from the study and concludes that greenhouse gas emissions increase as site slope increases; the building footprint area (as distinct from Gross Floor Area, exposes the need to reduce the area of the building to reduce greenhouse gas emissions; excavation of rock soils creates higher emissions than other soil types; and cut and fill excavation on steeply slope sites increase emissions. Potential alternative construction includes suspended floor construction systems which involve less excavation.

  3. Greenhouse Gas Emissions from Excavation on Residential Construction Sites

    Directory of Open Access Journals (Sweden)

    Perry Forsythe

    2014-12-01

    Full Text Available Despite considerable research concerning the manifestation of greenhouse gases in the usage of buildings, little has been done concerning emissions arising from the construction process itself. This paper specifically examines emissions arising from cut and fill excavation on residential construction sites. Even though such excavation is often seen as being economical in terms of providing a flat base for concrete raft slab construction, the environmental consequences of this approach need to be considered more fully in terms of impact on the environment. This is particularly important when steeply sloping sites are involved and for different soil types. The paper undertakes a study that quantitatively assesses the cumulative greenhouse gas emissions caused by cut and fill excavation on 52 residential projects in Australia for a range of slope and soil types. The paper presents results from the study and concludes that greenhouse gas emissions increase as site slope increases; the building footprint area (as distinct from Gross Floor Area, exposes the need to reduce the area of the building to reduce greenhouse gas emissions; excavation of rock soils creates higher emissions than other soil types; and cut and fill excavation on steeply slope sites increase emissions. Potential alternative construction includes suspended floor construction systems which involve less excavation. 

  4. Event-based soil loss models for construction sites

    Science.gov (United States)

    Trenouth, William R.; Gharabaghi, Bahram

    2015-05-01

    The elevated rates of soil erosion stemming from land clearing and grading activities during urban development, can result in excessive amounts of eroded sediments entering waterways and causing harm to the biota living therein. However, construction site event-based soil loss simulations - required for reliable design of erosion and sediment controls - are one of the most uncertain types of hydrologic models. This study presents models with improved degree of accuracy to advance the design of erosion and sediment controls for construction sites. The new models are developed using multiple linear regression (MLR) on event-based permutations of the Universal Soil Loss Equation (USLE) and artificial neural networks (ANN). These models were developed using surface runoff monitoring datasets obtained from three sites - Greensborough, Cookstown, and Alcona - in Ontario and datasets mined from the literature for three additional sites - Treynor, Iowa, Coshocton, Ohio and Cordoba, Spain. The predictive MLR and ANN models can serve as both diagnostic and design tools for the effective sizing of erosion and sediment controls on active construction sites, and can be used for dynamic scenario forecasting when considering rapidly changing land use conditions during various phases of construction.

  5. Effectiveness of Practicing Supply Chain Management in Construction Site

    Directory of Open Access Journals (Sweden)

    Mamter S.

    2014-01-01

    Full Text Available Construction Supply chain management comprised of the network of organization involved in the different processes and activities which produce the material, components and services that come together to design, procurement and deliver a building. It also consists of different organizations involved in the construction process including client/owner, designer, contractor, subcontractor and suppliers. This paper shall present on the implementation of supply chain management in construction and the effectiveness of practicing SCM in construction site. A field study is done from the viewpoint of contractor and consultant then analysed by using average index methods and presented in a statistical analysis. From the analysis, it reveals that effectiveness of practicing the SCM give a lot of good performances and granted benefits to contractor. The statistical analysis produced first ranking effectiveness of SCM is can minimize waste of material and labor for construction project.

  6. A novel methodology to estimate the evolution of construction waste in construction sites.

    Science.gov (United States)

    Katz, Amnon; Baum, Hadassa

    2011-02-01

    This paper focuses on the accumulation of construction waste generated throughout the erection of new residential buildings. A special methodology was developed in order to provide a model that will predict the flow of construction waste. The amount of waste and its constituents, produced on 10 relatively large construction sites (7000-32,000 m(2) of built area) was monitored periodically for a limited time. A model that predicts the accumulation of construction waste was developed based on these field observations. According to the model, waste accumulates in an exponential manner, i.e. smaller amounts are generated during the early stages of construction and increasing amounts are generated towards the end of the project. The total amount of waste from these sites was estimated at 0.2m(3) per 1m(2) floor area. A good correlation was found between the model predictions and actual data from the field survey. Copyright © 2010 Elsevier Ltd. All rights reserved.

  7. Quality assurance during site construction of nuclear power plants

    International Nuclear Information System (INIS)

    1981-01-01

    This Safety Guide provides requirements and recommendations related to the establishment and implementation of a quality assurance programme for the site construction activities at nuclear power plants. These include activities such as fabricating, erecting, installing, handling, storing, cleaning, flushing, inspecting, testing, modifying, repairing, and maintaining

  8. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE ITER

    Science.gov (United States)

    In Fall 1994, anaerobic compost wetlands in both upflow and downflow configurations were constructed adjacent to and received drainage from the Burleigh Tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The e...

  9. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE TECHNOLOGY CAPSULE

    Science.gov (United States)

    In fall 1994, anaerobic compost wetlands in both upflow and down flow configurations were constructed adjacent to and received drainage from the Burleigh tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The ...

  10. Proposed genetic algorithms for construction site lay out

    NARCIS (Netherlands)

    Mawdesley, Michael J.; Al-Jibouri, Saad H.S.

    2003-01-01

    The positioning of temporary facilities on a construction site is an area of research which has been recognised as important but which has received relatively little attention. In this paper, a genetic algorithm is proposed to solve the problem in which m facilities are to be positioned to n

  11. Genetic algorithm optimization for dynamic construction site layout planning

    Directory of Open Access Journals (Sweden)

    Farmakis Panagiotis M.

    2018-02-01

    Full Text Available The dynamic construction site layout planning (DCSLP problem refers to the efficient placement and relocation of temporary construction facilities within a dynamically changing construction site environment considering the characteristics of facilities and work interrelationships, the shape and topography of the construction site, and the time-varying project needs. A multi-objective dynamic optimization model is developed for this problem that considers construction and relocation costs of facilities, transportation costs of resources moving from one facility to another or to workplaces, as well as safety and environmental considerations resulting from facilities’ operations and interconnections. The latter considerations are taken into account in the form of preferences or constraints regarding the proximity or remoteness of particular facilities to other facilities or work areas. The analysis of multiple project phases and the dynamic facility relocation from phase to phase highly increases the problem size, which, even in its static form, falls within the NP (for Nondeterministic Polynomial time- hard class of combinatorial optimization problems. For this reason, a genetic algorithm has been implemented for the solution due to its capability to robustly search within a large solution space. Several case studies and operational scenarios have been implemented through the Palisade’s Evolver software for model testing and evaluation. The results indi­cate satisfactory model response to time-varying input data in terms of solution quality and computation time. The model can provide decision support to site managers, allowing them to examine alternative scenarios and fine-tune optimal solutions according to their experience by introducing desirable preferences or constraints in the decision process.

  12. Insights into Architects’ Future Roles in Off-Site Construction

    Directory of Open Access Journals (Sweden)

    Jianing Luo

    2017-03-01

    Full Text Available Today’s construction industry is overflowing with new ideas about its future. Off-Site Manufacture and Construction (OSCM is at the heart of the modern construction industry. Much has been written about the state and context of OSCM in different countries regarding its perceived benefits and barriers to implementation. Off-site production (OSP plays an important role in improving fragmented construction processes. Although most OSP research targets the attitudes and practices of OSP adoption, there is limited understanding of the philosophical issues underpinning OSP-related architecture. The roles of the architects’ personal philosophies are neglected and this hampers their implementation of OSCM (which has had a largely technical focus. This paper explores the traditional thinking patterns of architects in China and predicts possible future roles for them. It then conceptualizes an “architectural work” mode and a “building product” mode of design and construction and identifies the shortcomings of architects in an OSCM environment. The arguments made are based on practitioners’ perceptions and the first author’s practical experiences of leading several real-life projects in recent years. The findings reveal the implications and significance of the transformation from an “architectural work” mode to a “building product” mode. We foresee a study approach that focuses on the order and rules for OSCM, resulting in architects’ existing mindsets being changed to thinking patterns and design methodologies better suited to OSCM.

  13. Behavior-based safety on construction sites: a case study.

    Science.gov (United States)

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in

  14. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  15. Writing for the web composing, coding, and constructing web sites

    CERN Document Server

    Applen, JD

    2013-01-01

    Writing for the Web unites theory, technology, and practice to explore writing and hypertext for website creation. It integrates such key topics as XHTML/CSS coding, writing (prose) for the Web, the rhetorical needs of the audience, theories of hypertext, usability and architecture, and the basics of web site design and technology. Presenting information in digestible parts, this text enables students to write and construct realistic and manageable Web sites with a strong theoretical understanding of how online texts communicate to audiences. Key features of the book

  16. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  17. Optimal number of coarse-grained sites in different components of large biomolecular complexes.

    Science.gov (United States)

    Sinitskiy, Anton V; Saunders, Marissa G; Voth, Gregory A

    2012-07-26

    The computational study of large biomolecular complexes (molecular machines, cytoskeletal filaments, etc.) is a formidable challenge facing computational biophysics and biology. To achieve biologically relevant length and time scales, coarse-grained (CG) models of such complexes usually must be built and employed. One of the important early stages in this approach is to determine an optimal number of CG sites in different constituents of a complex. This work presents a systematic approach to this problem. First, a universal scaling law is derived and numerically corroborated for the intensity of the intrasite (intradomain) thermal fluctuations as a function of the number of CG sites. Second, this result is used for derivation of the criterion for the optimal number of CG sites in different parts of a large multibiomolecule complex. In the zeroth-order approximation, this approach validates the empirical rule of taking one CG site per fixed number of atoms or residues in each biomolecule, previously widely used for smaller systems (e.g., individual biomolecules). The first-order corrections to this rule are derived and numerically checked by the case studies of the Escherichia coli ribosome and Arp2/3 actin filament junction. In different ribosomal proteins, the optimal number of amino acids per CG site is shown to differ by a factor of 3.5, and an even wider spread may exist in other large biomolecular complexes. Therefore, the method proposed in this paper is valuable for the optimal construction of CG models of such complexes.

  18. Investigation and demonstration of turbidity reduction in stormwater runoff for Oklahoma highway construction sites : final report.

    Science.gov (United States)

    2013-12-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction industry to control the discharge of pollutants from the sites. The construction effluent guidelines or ELGs require construction sites to reduce the pollu...

  19. AUTOCAD IN THE OPERATIONAL MANAGEMENT OF THE CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Tsareva Marina Vladimirovna

    2016-04-01

    Full Text Available Operational management of the construction is usually based on information analysis systems, which are aimed at the monitoring of working schedule and volumes as consistent with predicated schedules. The result of such systems’ operation is traditional information graphics (diagrams, charts, etc., which provides idea on the current state of the construction site and deviations from the planned settings. The author considers the visualization technology of construction of objects using an image of the situation on the AutoCAD drawings, converted into an interactive format. The article focuses on imperfections of the existing technologies of information support of the managers. The creation of unified IT platform is offered on the basis of CAD for creating an integrated information storage and visualization of the environment using electronic drawings and diagrams. Using interactive methods it is possible to illustrate the condition of almost any part of the construction project using these drawings and diagrams. E-drawings contain the basic information resources - estimates, plans, sections, specifications, technology, construction, etc. necessary for the calculation of indicators. The author proved that implementation of visualization is most efficient in case of electronic drawings in 3D format.

  20. Standardized UXO Technology Demonstration Site, Woods Scoring Record Number 486

    National Research Council Canada - National Science Library

    Overbay, Larry; Robitaille, George

    2005-01-01

    ...) utilizing the APG Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbay and the Standardized UXO Technology Demonstration Site Scoring Committee...

  1. A large number of stepping motor network construction by PLC

    Science.gov (United States)

    Mei, Lin; Zhang, Kai; Hongqiang, Guo

    2017-11-01

    In the flexible automatic line, the equipment is complex, the control mode is flexible, how to realize the large number of step and servo motor information interaction, the orderly control become a difficult control. Based on the existing flexible production line, this paper makes a comparative study of its network strategy. After research, an Ethernet + PROFIBUSE communication configuration based on PROFINET IO and profibus was proposed, which can effectively improve the data interaction efficiency of the equipment and stable data interaction information.

  2. Socioeconomic conditions and number of pain sites in women

    Directory of Open Access Journals (Sweden)

    Rannestad Toril

    2012-03-01

    Full Text Available Abstract Background Women in deprived socioeconomic situations run a high pain risk. Although number of pain sites (NPS is considered highly relevant in pain assessment, little is known regarding the relationship between socioeconomic conditions and NPS. Methods The study population comprised 653 women; 160 recurrence-free long-term gynecological cancer survivors, and 493 women selected at random from the general population. Demographic characteristics and co-morbidity over the past 12 months were assessed. Socioeconomic conditions were measured by Socioeconomic Condition Index (SCI, comprising education, employment status, income, ability to pay bills, self-perceived health, and satisfaction with number of close friends. Main outcome measure NPS was recorded using a body outline diagram indicating where the respondents had experienced pain during the past week. Chi-square test and forward stepwise logistic regression were applied. Results and Conclusion There were only minor differences in SCI scores between women with 0, 1-2 or 3 NPS. Four or more NPS was associated with younger age, higher BMI and low SCI. After adjustment for age, BMI and co-morbidity, we found a strong association between low SCI scores and four or more NPS, indicating that there is a threshold in the NPS count for when socioeconomic determinants are associated to NPS in women.

  3. Siting, design and construction of underground repositories for radioactive wastes

    International Nuclear Information System (INIS)

    1986-01-01

    The objectives of the Symposium were to provide a forum for exchange of information internationally on the various scientific, technological, engineering and safety bases for the siting, design and construction of underground repositories, and to highlight current important issues and identify possible approaches. Forty-nine papers were presented, covering general approaches and regulatory aspects, disposal in shallow ground and rock cavities, disposal in deep geological formations and safety assessments related to the subject of the Symposium. Separate abstracts were prepared for each of these papers

  4. Unique Construction and Social Experiences in Residential Remediation Sites - 13423

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Paul; Scarborough, Rebecca [Sevenson Environmental Services, Inc. 2749 Lockport Road, Niagara Falls, NY 14305 (United States)

    2013-07-01

    Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

  5. Pyramiding tumuli waste disposal site and method of construction thereof

    Science.gov (United States)

    Golden, Martin P.

    1989-01-01

    An improved waste disposal site for the above-ground disposal of low-level nuclear waste as disclosed herein. The disposal site is formed from at least three individual waste-containing tumuli, wherein each tumuli includes a central raised portion bordered by a sloping side portion. Two of the tumuli are constructed at ground level with adjoining side portions, and a third above-ground tumulus is constructed over the mutually adjoining side portions of the ground-level tumuli. Both the floor and the roof of each tumulus includes a layer of water-shedding material such as compacted clay, and the clay layer in the roofs of the two ground-level tumuli form the compacted clay layer of the floor of the third above-ground tumulus. Each tumulus further includes a shield wall, preferably formed from a solid array of low-level handleable nuclear wate packages. The provision of such a shield wall protects workers from potentially harmful radiation when higher-level, non-handleable packages of nuclear waste are stacked in the center of the tumulus.

  6. Unique Construction and Social Experiences in Residential Remediation Sites - 13423

    International Nuclear Information System (INIS)

    Jung, Paul; Scarborough, Rebecca

    2013-01-01

    Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

  7. Small numbers are sensed directly, high numbers constructed from size and density.

    Science.gov (United States)

    Zimmermann, Eckart

    2018-04-01

    Two theories compete to explain how we estimate the numerosity of visual object sets. The first suggests that the apparent numerosity is derived from an analysis of more low-level features like size and density of the set. The second theory suggests that numbers are sensed directly. Consistent with the latter claim is the existence of neurons in parietal cortex which are specialized for processing the numerosity of elements in the visual scene. However, recent evidence suggests that only low numbers can be sensed directly whereas the perception of high numbers is supported by the analysis of low-level features. Processing of low and high numbers, being located at different levels of the neural hierarchy should involve different receptive field sizes. Here, I tested this idea with visual adaptation. I measured the spatial spread of number adaptation for low and high numerosities. A focused adaptation spread of high numerosities suggested the involvement of early neural levels where receptive fields are comparably small and the broad spread for low numerosities was consistent with processing of number neurons which have larger receptive fields. These results provide evidence for the claim that different mechanism exist generating the perception of visual numerosity. Whereas low numbers are sensed directly as a primary visual attribute, the estimation of high numbers however likely depends on the area size over which the objects are spread. Copyright © 2017 Elsevier B.V. All rights reserved.

  8. Confirmation Sampling and Analysis Plan for Spill Site Number 1

    National Research Council Canada - National Science Library

    1998-01-01

    ... No. 1 to document the effectiveness of bioventing for the remediation of petroleum-hydrocarbon-contaminated soils and to provide data for a risk-based assessment of contaminants remaining in site soils and groundwater. Spill Site...

  9. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    International Nuclear Information System (INIS)

    Yu, Ann T.W.; Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Highlights: ► A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. ► However, the reduction cannot be sustained. ► Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006–2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  10. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk [Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong); Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara [Department of Civil and Structural Engineering, Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong)

    2013-01-15

    Highlights: Black-Right-Pointing-Pointer A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. Black-Right-Pointing-Pointer However, the reduction cannot be sustained. Black-Right-Pointing-Pointer Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  11. Construction of Site Risk Model using Individual Unit Risk Model in a NPP Site

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Ho Gon; Han, Sang Hoon [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Since Fukushima accident, strong needs to estimate site risk has been increased to identify the possibility of re-occurrence of such a tremendous disaster and prevent such a disaster. Especially, in a site which has large fleet of nuclear power plants, reliable site risk assessment is very emergent to confirm the safety. In Korea, there are several nuclear power plant site which have more than 6 NPPs. In general, risk model of a NPP in terms of PSA is very complicated and furthermore, it is expected that the site risk model is more complex than that. In this paper, the method for constructing site risk model is proposed by using individual unit risk model. Procedure for the development of site damage (risk) model was proposed in the present paper. Since the site damage model is complicated in the sense of the scale of the system and dependency of the components of the system, conventional method may not be applicable in many side of the problem.

  12. Construction of hexahedral elements mesh capturing realistic geometries of Bayou Choctaw SPR site

    Energy Technology Data Exchange (ETDEWEB)

    Park, Byoung Yoon [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Roberts, Barry L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-09-01

    The three-dimensional finite element mesh capturing realistic geometries of Bayou Choctaw site has been constructed using the sonar and seismic survey data obtained from the field. The mesh is consisting of hexahedral elements because the salt constitutive model is coded using hexahedral elements. Various ideas and techniques to construct finite element mesh capturing artificially and naturally formed geometries are provided. The techniques to reduce the number of elements as much as possible to save on computer run time with maintaining the computational accuracy is also introduced. The steps and methodologies could be applied to construct the meshes of Big Hill, Bryan Mound, and West Hackberry strategic petroleum reserve sites. The methodology could be applied to the complicated shape masses for not only various civil and geological structures but also biological applications such as artificial limbs.

  13. Construction quality assurance closure report, Lawrence Livermore National Laboratory Site 300, Pits 1 and 7

    International Nuclear Information System (INIS)

    1993-02-01

    This document presents the Final Construction Quality Assurance (CQA) report for the closure cover system of two mixed, low-level radioactive and hazardous waste landfills (pits) at Site 300. Site 300, operated by the Lawrence Livermore National Laboratory (LLNL), is located in the Altamont Hills, approximately 15 miles southeast of Livermore, California. The purpose of this report is to document the CQA program established to assure that construction is completed in accordance with the design intent and the approved Closure and Post Closure Plans dated May 1989 and revised January 1990 (EPA ID Number: CA 2890090002). Inclusive within the Closure and Post Closure Plan were the CQA Plan and the Technical Specifications for the final cover system. This report contains a complete narrative with photographic documentation of the construction activities and progress, problems encountered and solutions utilized, and third party testing and monitoring results, thus establishing the verification of compliance with the Quality Assurance Plan for the project

  14. Yucca Mountain Site Characterization Project exploratory studies facilities construction status

    International Nuclear Information System (INIS)

    Allan, J.N.; Leonard, T.M.

    1993-01-01

    This paper discusses the progress to date on the construction planning and development of the Yucca Mountain Site Characterization Project (YMP) Exploratory Studies Facilities (ESF). The purpose of the ESF is to determine early site suitability and to characterize the subsurface of the Yucca Mountain site to assess its suitability for a potential high level nuclear waste repository. The present ESF configuration concept is for two main ramps to be excavated by tunnel boring machines (TBM) from the surface to the Topopah Spring Member of the Paintbrush Tuff Formation. From the main ramps, slightly above Topopah Spring level, supplemental ramps will be penetrated to the Calico Hills formation below the potential repository. There will be exploratory development drifts driven on both levels with the Main Test Area being located on the Topopah Spring level, which is the level of the proposed repository. The Calico Hills formation lies below the Topopah Spring member and is expected to provide the main geo-hydrologic barrier between the potential repository and the underlying saturated zones in the Crater Flat Tuff

  15. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong.

    Science.gov (United States)

    Yu, Ann T W; Poon, C S; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C&D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C&D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C&D waste. Copyright © 2012 Elsevier Ltd. All rights reserved.

  16. Safety inspections in construction sites: A systems thinking perspective.

    Science.gov (United States)

    Saurin, Tarcisio Abreu

    2016-08-01

    Although safety inspections carried out by government officers are important for the prevention of accidents, there is little in-depth knowledge on their outcomes and processes leading to these. This research deals with this gap by using systems thinking (ST) as a lens for obtaining insights into safety inspections in construction sites. Thirteen case studies of sites with prohibited works were carried out, discussing how four attributes of ST were used in the inspections. The studies were undertaken over 6 years, and sources of evidence involved participant observation, direct observations, analysis of documents and interviews. Two complementary ways for obtaining insights into inspections, based on ST, were identified: (i) the design of the study itself needs to be in line with ST; and (ii) data collection and analysis should focus on the agents involved in the inspections, the interactions between agents, the constraints and opportunities faced by agents, the outcomes of interactions, and the recommendations for influencing interactions. Copyright © 2015 Elsevier Ltd. All rights reserved.

  17. Construction site Voice Operated Information System (VOIS) test

    Science.gov (United States)

    Lawrence, Debbie J.; Hettchen, William

    1991-01-01

    The Voice Activated Information System (VAIS), developed by USACERL, allows inspectors to verbally log on-site inspection reports on a hand held tape recorder. The tape is later processed by the VAIS, which enters the information into the system's database and produces a written report. The Voice Operated Information System (VOIS), developed by USACERL and Automated Sciences Group, through a ESACERL cooperative research and development agreement (CRDA), is an improved voice recognition system based on the concepts and function of the VAIS. To determine the applicability of the VOIS to Corps of Engineers construction projects, Technology Transfer Test Bad (T3B) funds were provided to the Corps of Engineers National Security Agency (NSA) Area Office (Fort Meade) to procure and implement the VOIS, and to train personnel in its use. This report summarizes the NSA application of the VOIS to quality assurance inspection of radio frequency shielding and to progress payment logs, and concludes that the VOIS is an easily implemented system that can offer improvements when applied to repetitive inspection procedures. Use of VOIS can save time during inspection, improve documentation storage, and provide flexible retrieval of stored information.

  18. Library construction and evaluation for site saturation mutagenesis.

    Science.gov (United States)

    Sullivan, Bradford; Walton, Adam Z; Stewart, Jon D

    2013-06-10

    We developed a method for creating and evaluating site-saturation libraries that consistently yields an average of 27.4±3.0 codons of the 32 possible within a pool of 95 transformants. This was verified by sequencing 95 members from 11 independent libraries within the gene encoding alkene reductase OYE 2.6 from Pichia stipitis. Correct PCR primer design as well as a variety of factors that increase transformation efficiency were critical contributors to the method's overall success. We also developed a quantitative analysis of library quality (Q-values) that defines library degeneracy. Q-values can be calculated from standard fluorescence sequencing data (capillary electropherograms) and the degeneracy predicted from an early stage of library construction (pooled plasmids from the initial transformation) closely matched that observed after ca. 1000 library members were sequenced. Based on this experience, we suggest that this analysis can be a useful guide when applying our optimized protocol to new systems, allowing one to focus only on good-quality libraries and reject substandard libraries at an early stage. This advantage is particularly important when lower-throughput screening techniques such as chiral-phase GC must be employed to identify protein variants with desirable properties, e.g., altered stereoselectivities or when multiple codons are targeted for simultaneous randomization. Copyright © 2013 Elsevier Inc. All rights reserved.

  19. Siting and constructing very deep monitoring wells on the US Department of Energy's Nevada Test Site

    International Nuclear Information System (INIS)

    Cullen, J.J.; Jacobson, R.L.; Russell, C.E.

    1991-01-01

    Many aspects of the Nevada Test Site's (NTS) hydrogeologic setting restrict the use of traditional methods for the siting and construction of ground-water characterization and monitoring wells. The size of the NTS precludes establishing high-density networks of characterization wells, as are typically used at smaller sites. The geologic complexity and variability of the NTS requires that the wells be criticality situated. The hydrogeologic complexity requires that each well provide access to many aquifers. Depths to ground water on the NTS require the construction of wells averaging approximately 1000 meters in depth. Wells meeting these criteria are uncommon in the ground-water industry, therefore techniques used by petroleum engineers are being employed to solve certain siting-, design- and installation-related problems. To date, one focus has been on developing completion strings that facilitate routine and efficient ground-water sampling from multiple intervals in a single well. The method currently advocated employs a new design of sliding side door sleeve that is actuated by an electrically operated hydraulic shifting tool. Stemming of the wells is being accomplished with standard materials (cement based grouts and sands); however, new stemming methods are being developed, to accommodate the greater depths, to minimize pH-related problems caused by the use of cements, to enhance the integrity of the inter-zone seals, and to improve the representativeness of radionuclide analyses performed on ground-water samples. Bench-scale experiments have been used to investigate the properties of more than a dozen epoxy-aggregate grout mixtures -- materials that are commonly used in underwater sealing applications

  20. Construction Site Environmental Impact in Civil Engineering Education

    Science.gov (United States)

    Teixeira, Jose M. Cardoso

    2005-01-01

    The environmental impact of construction activity has gained increasing importance in the last few years and become a key subject for civil engineering education. A survey of Portuguese higher education institutions shows that concern with this topic is mostly directed at the impact of large construction projects and especially focused on their…

  1. Radioactive air emissions notice of construction for deactivation of the PUREX storage tunnel number 2; FINAL

    International Nuclear Information System (INIS)

    JOHNSON, R.E.

    1999-01-01

    The Plutonium-Uranium Extraction (PUREX) Plant Storage Tunnel Number 2 (hereafter referred to as the PUREX Tunnel) was built in 1964. Since that time, the PUREX Tunnel has been used for storage of radioactive and mixed waste. In 1991, the PUREX Plant ceased operations and was transitioned to deactivation. The PUREX Tunnel continued to receive PUREX Plant waste material for storage during transition activities. Before 1995, a decision was made to store radioactive and mixed waste in the PUREX Tunnel generated from other onsite sources, on a case-by-case basis. This notice of construction (NOC) describes the activities associated with the reactivation of the PUREX Tunnel ventilation system and the transfer of up to 3.5 million curies (MCi) of radioactive waste to the PUREX Tunnel from any location on the Hanford Site. The unabated total effective dose equivalent (TEDE) estimated for the hypothetical offsite maximally exposed individual (MEI) is 5.6 E-2 millirem (mrem). The abated TEDE conservatively is estimated to account for 1.9 E-5 mrem to the MEI. The following text provides information requirements of Appendix A of Washington Administrative Code (WAC) 246-247 (requirements 1 through 18)

  2. The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation

    Science.gov (United States)

    Zhadanovsky, Boris; Sinenko, Sergey

    2018-03-01

    Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.

  3. Construction management at the SP-100 ground engineering system test site

    International Nuclear Information System (INIS)

    Burchell, G.P.; Wilson, L.R.

    1991-01-01

    Contractors under the U.S. Department of Energy management have implemented a comprehensive approach to the management of design and construction of the complex facility modifications at the SP-100 Ground Engineering System Test Site on the Hanford Reservation. The SP-100 Test Site employs a multi-organizational integrated management approach with clearly defined responsibilities to assure success. This approach allows for thorough planning and analysis before the project kick off, thus minimizing the number and magnitude of problems which arise during the course of the project. When combined with a comprehensive cost and schedule/project management reporting system the problems which do occur are recognized early enough to assure timely intervention and resolution

  4. Constructing Optimal Coarse-Grained Sites of Huge Biomolecules by Fluctuation Maximization.

    Science.gov (United States)

    Li, Min; Zhang, John Zenghui; Xia, Fei

    2016-04-12

    Coarse-grained (CG) models are valuable tools for the study of functions of large biomolecules on large length and time scales. The definition of CG representations for huge biomolecules is always a formidable challenge. In this work, we propose a new method called fluctuation maximization coarse-graining (FM-CG) to construct the CG sites of biomolecules. The defined residual in FM-CG converges to a maximal value as the number of CG sites increases, allowing an optimal CG model to be rigorously defined on the basis of the maximum. More importantly, we developed a robust algorithm called stepwise local iterative optimization (SLIO) to accelerate the process of coarse-graining large biomolecules. By means of the efficient SLIO algorithm, the computational cost of coarse-graining large biomolecules is reduced to within the time scale of seconds, which is far lower than that of conventional simulated annealing. The coarse-graining of two huge systems, chaperonin GroEL and lengsin, indicates that our new methods can coarse-grain huge biomolecular systems with up to 10,000 residues within the time scale of minutes. The further parametrization of CG sites derived from FM-CG allows us to construct the corresponding CG models for studies of the functions of huge biomolecular systems.

  5. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  6. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sustainable principles for siting, design and construction. [Reserved] 433.6 Section 433.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS... BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  7. Strategies for effective management of health and safety in confined site construction

    Directory of Open Access Journals (Sweden)

    John Spillane

    2013-12-01

    Full Text Available Purpose: The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. Design/Methodology/Approach: This is achieved by utilising individual interviews, focus groups discussion on selected case studies of confined construction sites, coupled with a questionnaire survey. Findings: The top five key strategies include (1 Employ safe system of work plans to mitigate personnel health and safety issues; (2 Inform personnel, before starting on-site, of the potential issues using site inductions; (3 Effective communication among site personnel; (4 Draft and implement an effective design site layout prior to starting on-site; and (5 Use of banksman (traffic co-ordinator to segregate personnel from vehicular traffic. Practical Implication: The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. Originality/Value: This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.

  8. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    Scott, D.E.; Pechmann, J.H.K.; Knox, J.N.; Estes, R.A.; McGregor, J.H.; Bailey, K.

    1988-12-01

    The Savannah River Ecology Laboratory has completed 10 years of ecological studies related to the construction of the Defense Waste Processing Facility (DWPF) on the Savannah River Site. This progress report examines water quality studies on streams peripheral to the DWPF construction site and examines the effectiveness of ''refuge ponds'' in ameliorating the effects of construction on local amphibians. Individual papers on these topics are indexed separately. 93 refs., 15 figs., 15 tabs

  9. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Scott, D.E.; Pechmann, J.H.K.; Knox, J.N.; Estes, R.A.; McGregor, J.H.; Bailey, K. (ed.)

    1988-12-01

    The Savannah River Ecology Laboratory has completed 10 years of ecological studies related to the construction of the Defense Waste Processing Facility (DWPF) on the Savannah River Site. This progress report examines water quality studies on streams peripheral to the DWPF construction site and examines the effectiveness of refuge ponds'' in ameliorating the effects of construction on local amphibians. Individual papers on these topics are indexed separately. 93 refs., 15 figs., 15 tabs. (MHB)

  10. Maturity of project management in construction companies with the use of fuzzy numbers

    Science.gov (United States)

    Klaus-Rosińska, Agata; Kuchta, Dorota

    2017-07-01

    The main aim of the article is to describe issue of maturity in project management regarding construction companies. Taking into consideration this problem the literature research was made, existing project management maturity models were analyzed, model of maturity in project management (using fuzzy numbers approach) was described and tested. The results of testing stage are shown in the case study.

  11. Construction of Basic Evaluation Criteria for Candidate HLW Repository Sites (1)

    International Nuclear Information System (INIS)

    Koh, Yong Kwon; Bae, Dae Seok; Kim, Kyung Su; Kim, Geon Young; Park, Kyung Woo; Ji, Sung Hoon; Ryu, Ji Hun

    2009-08-01

    We constructed the preliminary site assessment system for selection of proper site as high level radioactive disposal repository with consideration of Korean geological characteristics and underground environments. And, site assessment factor and standard as a point of geologic aspect were suggested for decision of candidate radioactive disposal site in Korea. The results can be used to develop the geological information system for assessment of candidate disposal site

  12. Improving Site Management Practices in the Nigerian Construction ...

    African Journals Online (AJOL)

    Site management involves a combination of activities, which turn basic resources into a finished product. The effectiveness of managing production process cannot be economically attained by force, but requires the creation of conditions that will encourage self-motivation and bring about team spirit that is important to an ...

  13. Relationship Between the Number of Clinical Sites in Radiography Programs and Job Placement Rates of Graduates.

    Science.gov (United States)

    Harrell, Angela; Matthews, Eric

    2016-07-01

    To determine whether a relationship exists between the number of clinical sites available in radiography programs accredited by the Joint Review Committee on Education in Radiologic Technology and the job placement rates of graduates. We performed a secondary analysis of data on job placement rates and the number of clinical sites available in 438 degree-granting radiography programs from January 2015 to March 2015. A weak, negative, nonsignificant correlation existed between the number of clinical sites and the job placement rate (Spearman's rho = -.113, n = 438, P = .018). The coefficient of determination was 1.28%.Discussion Research evaluating factors contributing to graduate employability is limited but indicates no need for radiography program administrators to adjust clinical site numbers solely on the basis of improving graduate employability. The number of clinical sites available in a radiography program is not related to the job placement rate of its graduates. ©2016 American Society of Radiologic Technologists.

  14. Utilisation of employee assistance programme to reduce absenteeism on construction sites

    OpenAIRE

    2013-01-01

    M.Tech (Construction Management) Many construction companies are beginning to realize the value of their employees. Employees are to a large extent the engine of the organisation. Todays employees are under a lot of pressure and stress from home and at the construction sites. The construction industry just like any other industry, is faced with the challenges of dealing with personal as well as work related problems. These problems they have effect on job performance. An Employee assistanc...

  15. New Reactor Siting, Licensing and Construction Experience. Proceedings of the 2. CNRA International Workshop on 'New Reactor Siting, Licensing and Construction Experience'

    International Nuclear Information System (INIS)

    2013-01-01

    This report documents the proceedings from the 2. Workshop on New Reactor Siting, Licensing and Construction Experience. A total of 45 specialists from 16 countries and international organisations attended. The meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the US Nuclear Regulatory Commission (U.S.NRC). The objectives of the workshop were to provide a forum to exchange information on lessons learned from siting, licensing and constructing new nuclear power plants around the world. Key focus areas included siting practices and regulatory positions that have been enhanced as a result of the Fukushima accident; lessons learned from licensing and design review approaches and challenges, construction experience and recommendations for regulatory oversight; and regulatory cooperation on generic and design specific issues through the MDEP specific working groups. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to regulatory cooperation on generic and design specific issues, MDEP working groups (EPR, AP1000), vendor inspection co-operation, digital I and C, and codes and standards. The second technical session was intended to discuss and share regulatory positions on siting practices and enhancements as a result of lessons learned from Fukushima accident. The third technical session addressed the construction experience and regulatory oversight of new reactor construction activities. And the fourth technical session included presentations on the lessons learned from regulatory licensing reviews of new reactor designs

  16. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Pechmann, J.H.K.; Scott, D.E.; McGregor, J.H.; Estes, R.A.; Chazal, A.C.

    1993-02-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980's. The Savannah River Ecology Laboratory (SREL) has completed 12 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of refuge ponds'' as alternative breeding sites for amphibians that formerly bred at Sun Bay Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10CFR1022).

  17. Environmental Assessment for the construction and operation of the Health Physics Site Support Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    1995-07-01

    DOE has prepared an environmental assessment for the proposed construction and operation of the Health Physics Site Support Facility on the Savannah River Site. This (new) facility would meet requirements of the site radiological protection program and would ensure site compliance with regulations. It was determined that the proposed action is not a major Federal action significantly affecting the quality of the environment within the meaning of NEPA. Therefore, a finding of no significant impact is made, and no environmental impact statement is needed

  18. Critical management practices influencing on-site waste minimization in construction projects.

    Science.gov (United States)

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. A Study Identifying Causes of Construction Waste Production and Applying Safety Management on Construction Site

    Directory of Open Access Journals (Sweden)

    Ali Asghar Najafpoor

    2014-09-01

    Full Text Available Background and purpose: In a recent century, the amount of construction waste has increased significantly. Although the building industry has a considerable role in the development of a society, it is regarded as an environmentally destructive. Source reduction is the highest goal in the waste management hierarchy and is in priority. It also has economic benefits by reducing costs associated with transportation, disposal or recycling of wastes. The present study is aimed to identify activities generating the wastes in design, transportation and storage and procurement of building materials. Materials and Methods: This was questionnaire survey. A total of 94 professionals in the construction industry were attended in this study. To determine the validity and reliability of the instrument, content validity method and Cronbach’s alpha coefficient (0.79 were used. Data were analyzed using SPSS for Windows. Frequencies, percentage, mean and standard deviation were determined in this research. Results: The results showed that handling and storage have been chosen as the most causative factor of waste production in construction activity. Improper material storage was identified major factor in producing waste in handling and storage phase. Usage of low-quality material in design stage and material price changes in procurement were recognized as major causes of waste production in these stages. Conclusion: All studied phases in this research were identified as causative factors in producing of waste. Identifying causes of construction waste production will help us decide better how to control this sort of wastes.

  20. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  1. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    OpenAIRE

    Spillane, John P; Oyedele, Lukumon O; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E; Tijani, Iyabo K

    2011-01-01

    The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues...

  2. A study on air pollution concentration at Desa parkcity construction site

    African Journals Online (AJOL)

    This study assesses the effect of construction workers exposure towards the air pollution to the correlation between meteorological factor with the particulate matter and other gases concentration at a construction site in DesaParkcity. The concentration of PM was collected by using low volume sampler meanwhile CO, CO2, ...

  3. Occupational health and safety in the Moroccan construction sites: preliminary diagnosis

    Science.gov (United States)

    Tarik, Bakeli; Adil, Hafidi Alaoui

    2018-05-01

    Managing occupational health and safety on Moroccan construction sector represents the first step for projects' success. In fact, by avoiding accidents, all the related direct and indirect costs and delays can be prevented. That leads to an important question always asked by any project manager: what are the factors responsible for accidents? How can they be avoided? Through this research, the aim is to go through these questions, to contribute in occupational health and safety principles understanding, to identify construction accidentology and risk management opportunities and to approach the case of Moroccan construction sites by an accurate diagnosis. The approach is to make researchers, managers, stakeholders and deciders aware about the criticality of construction sites health and safety situation. And, to do the first step for a scientific research project in relation with health and safety in the Moroccan construction sector. For this, the paper will study the related state of art namely about construction sites accidents causation, and will focus on Reason's `Swiss cheese' model and its utilization for Moroccan construction sites health and safety diagnosis. The research will end with an estimation of an accidents fatality rate in the Moroccan construction sector and a benchmarking with the international rates. Finally, conclusions will be presented about the necessity of Occupational Health and Safety Management System (OHSMS) implementation, which shall cover all risk levels, and insure, at the same time, that the necessary defenses against accidents are on place.

  4. Marketing Research of Construction Sites based on ABC-XYZ Analysis and Relational Data

    Directory of Open Access Journals (Sweden)

    Konikov Aleksandr

    2017-01-01

    Full Text Available ABC-XYZ analysis is well known in marketing. It allows identifying sites that yield maximum profits when sold, sites that enjoy stable demand, or sites have both qualities specified above. However, the methods are quite abstract and are not designed to study specific factors that impact the results of ABC-XYZ analysis. Meanwhile, for some applications, particularly for marketing research of construction sites, it is critical not only to identify high-profit and stable sites but also to find out what combination of technical parameters, factors related to their location, transport accessibility, etc. are typical of them. This work suggests an approach to address the issue.

  5. Economic considerations in the optimal size and number of reserve sites

    NARCIS (Netherlands)

    Groeneveld, R.A.

    2005-01-01

    The debate among ecologists on the optimal number of reserve sites under a fixed maximum total reserve area-the single large or several small (SLOSS) problem-has so far neglected the economic aspects of the problem. This paper argues that economic considerations can affect the optimal number and

  6. Developing a system dynamics model to analyse environmental problem in construction site

    Science.gov (United States)

    Haron, Fatin Fasehah; Hawari, Nurul Nazihah

    2017-11-01

    This study aims to develop a system dynamics model at a construction site to analyse the impact of environmental problem. Construction sites may cause damages to the environment, and interference in the daily lives of residents. A proper environmental management system must be used to reduce pollution, enhance bio-diversity, conserve water, respect people and their local environment, measure performance and set targets for the environment and sustainability. This study investigates the damaging impact normally occur during the construction stage. Environmental problem will cause costly mistake in project implementation, either because of the environmental damages that are likely to arise during project implementation, or because of modification that may be required subsequently in order to make the action environmentally acceptable. Thus, findings from this study has helped in significantly reducing the damaging impact towards environment, and improve the environmental management system performance at construction site.

  7. Assumption and program of the earlier stage construction of L/ILW disposal site

    International Nuclear Information System (INIS)

    Li Xuequn; Chen Shi; Li Xinbang

    1993-01-01

    The authors analysed the production and treatment of low- and intermediate-level radwastes (L/ILW) in China. Some problems and situation in this field are introduced. Over the past ten years, preliminary efforts have been made by CNNC (China National Nuclear Corporation) in policy, law and rules, developing program, management system, siting, engineering techniques, and safety assessment for radwaste disposal. The investment of the earlier stage work of L/ILW disposal site construction is estimated, the program and assumption to disposal site construction of the L/ILW are reviewed

  8. Construction quality assurance for Pit 6 landfill closure, Lawrence Livermore National Laboratory, Site 300

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-30

    Golder Construction Services, Inc. (GCS), under contract to the Regents of the University of California, Lawrence Livermore National Laboratory (LLNL), provided the construction quality assurance (CQA) observation and testing during the construction of the Site 300, Pit 6 landfill closure cover. The cap construction was performed as a CERCLA non-time-critical removal action from June 2 to August 29, 1997. the project site is located 18 miles east of Livermore on Tesla Road and approximately 10 miles southwest of Tracy on Corral Hollow Road in San Joaquin County, California. This report certifies that the LLNL, Site 300, Pit 6, Landfill Closure was constructed in accordance with the construction specifications and design drawings. This report documents construction activities and CQA monitoring and testing for construction of the Pit 6 Landfill Closure. Golder Associates, Inc. of Oakland, California was the design engineering firm responsible for preparation of the drawings and specifications. CQA services were provided by GCS, of Roseville, California, under supervision of a California registered civil Engineer.

  9. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    International Nuclear Information System (INIS)

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development

  10. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development.

  11. The occupational safety on the construction sites of the farm production buildings in Finland

    Directory of Open Access Journals (Sweden)

    M. Hellstedt

    2013-09-01

    Full Text Available The size of farms has increased considerably during Finland's EU membership. The growth has meant big investments in the new production buildings. The buildings have been switched to big industrialhall- like constructions from small-scale ones which have contained own timber and own work contribution. The objective of the project financed by Farmers' Social Insurance Institution was to improve occupational safety on farm building construction and renovation sites by disseminating current safety practices and by developing ways of action which are better than the prevailing ones. The project consisted of a literature review, statistical analysis, as well as a farmer and designer interviews. In the statistical analysis the MATA occupational injuries insurance claims database on farmers’ claims during construction and renovation work for the years 2005 - 2008 was compared with the register of Federation of Accident Insurance Institutions on the construction workers' injuries. In comparing the reasons of the accidents a clear difference was found; poor scaffoldings and ladders are still the main culprits on farm accidents. Farmer interviews were used to assess occupational safety measures on the construction site, occurred injuries and their types, nearmiss situations and the underlying factors which have led to the injuries. Also construction safety deficiencies as well as the direct and indirect costs caused for instance because of the delay in completion of construction project were discussed. Designer interviews aimed to find out how occupational safety and health considerations are taken into account in farm building planning and counseling, and how this experience of the designers should be utilized in order to improve safety at the construction sites on farms. Farmers knew their obligations on occupational safety poorly. The situation was further worsened by the fact that on the site the supervisor tasks were only nominally executed. The

  12. Site characterization progress report: Yucca Mountain, Nevada. Number 15, April 1--September 30, 1996

    International Nuclear Information System (INIS)

    1997-04-01

    During the second half of fiscal year 1996, activities at the Yucca Mountain Site Characterization Project (Project) supported the objectives of the revised Program Plan released this period by the Office of Civilian Radioactive Waste Management of the US Department of Energy (Department). Outlined in the revised plan is a focused, integrated program of site characterization, design, engineering, environmental, and performance assessment activities that will achieve key Program and statutory objectives. The plan will result in the development of a license application for repository construction at Yucca Mountain, if the site is found suitable. Activities this period focused on two of the three near-term objectives of the revised plan: updating in 1997 the regulatory framework for determining the suitability of the site for the proposed repository concept and providing information for a 1998 viability assessment of continuing toward the licensing of a repository. The Project has also developed a new design approach that uses the advanced conceptual design published during the last reporting period as a base for developing a design that will support the viability assessment. The initial construction phase of the Thermal Testing Facility was completed and the first phase of the in situ heater tests began on schedule. In addition, phase-one construction was completed for the first of two alcoves that will provide access to the Ghost Dance fault

  13. Site characterization progress report: Yucca Mountain, Nevada. Number 15, April 1--September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    During the second half of fiscal year 1996, activities at the Yucca Mountain Site Characterization Project (Project) supported the objectives of the revised Program Plan released this period by the Office of Civilian Radioactive Waste Management of the US Department of Energy (Department). Outlined in the revised plan is a focused, integrated program of site characterization, design, engineering, environmental, and performance assessment activities that will achieve key Program and statutory objectives. The plan will result in the development of a license application for repository construction at Yucca Mountain, if the site is found suitable. Activities this period focused on two of the three near-term objectives of the revised plan: updating in 1997 the regulatory framework for determining the suitability of the site for the proposed repository concept and providing information for a 1998 viability assessment of continuing toward the licensing of a repository. The Project has also developed a new design approach that uses the advanced conceptual design published during the last reporting period as a base for developing a design that will support the viability assessment. The initial construction phase of the Thermal Testing Facility was completed and the first phase of the in situ heater tests began on schedule. In addition, phase-one construction was completed for the first of two alcoves that will provide access to the Ghost Dance fault.

  14. A comprehensive software suite for protein family construction and functional site prediction.

    Directory of Open Access Journals (Sweden)

    David Renfrew Haft

    Full Text Available In functionally diverse protein families, conservation in short signature regions may outperform full-length sequence comparisons for identifying proteins that belong to a subgroup within which one specific aspect of their function is conserved. The SIMBAL workflow (Sites Inferred by Metabolic Background Assertion Labeling is a data-mining procedure for finding such signature regions. It begins by using clues from genomic context, such as co-occurrence or conserved gene neighborhoods, to build a useful training set from a large number of uncharacterized but mutually homologous proteins. When training set construction is successful, the YES partition is enriched in proteins that share function with the user's query sequence, while the NO partition is depleted. A selected query sequence is then mined for short signature regions whose closest matches overwhelmingly favor proteins from the YES partition. High-scoring signature regions typically contain key residues critical to functional specificity, so proteins with the highest sequence similarity across these regions tend to share the same function. The SIMBAL algorithm was described previously, but significant manual effort, expertise, and a supporting software infrastructure were required to prepare the requisite training sets. Here, we describe a new, distributable software suite that speeds up and simplifies the process for using SIMBAL, most notably by providing tools that automate training set construction. These tools have broad utility for comparative genomics, allowing for flexible collection of proteins or protein domains based on genomic context as well as homology, a capability that can greatly assist in protein family construction. Armed with this new software suite, SIMBAL can serve as a fast and powerful in silico alternative to direct experimentation for characterizing proteins and their functional interactions.

  15. Site characterization progress report, Yucca Mountain, Nevada. Number 19, April 1, 1998 - September 30, 1998

    International Nuclear Information System (INIS)

    1999-06-01

    The nineteenth semiannual report of the Yucca Mountain Site Characterization Project (YMP) summarizes activities during the period from April 1, 1998, through September 30, 1998. Project activities are aimed at evaluating Yucca Mountain as a potential location for permanent geologic disposal of nuclear materials, as directed by the Nuclear Waste Policy Act of 1982, as amended (NWPA). The progress report documents activities this period that contribute to completing the Project's near-term programmatic and statutory objectives. These objectives include completing the Viability Assessment, the Environmental Impact Statement (EIS), a possible US Department of Energy (DOE) Secretarial Site Recommendation to the President, and, if the site is suitable, submittal of a license application to the US Nuclear Regulatory Commission (NRC). Project work this period continued to be concentrated in three integrated activities: site characterization, engineering design and construction, and performance assessment. Accomplishments this period and their relation to near-term objectives are briefly summarized

  16. Childhood leukaemia and non-Hodgkin's lymphoma near large rural construction sites, with a comparison with Sellafield nuclear site

    International Nuclear Information System (INIS)

    Kinlen, L.J.; Dickson, M.; Stiller, C.A.

    1995-01-01

    The objective was to determine whether population mixing produced by large, non-nuclear construction projects in rural areas is associated with an increase in childhood leukaemia and non-Hodgkin's lymphoma. A study was undertaken of the incidence of leukaemia and non-Hodgkin's lymphoma among children living near large construction projects in Britain since 1945, situated more than 20 km from a population centre, involving a workforce of more than 1000, and built over three or more calendar years. A 37% excess of leukaemia and non-Hodgkin's lymphoma at 0-14 years of age was recorded during construction and the following calendar year. The excesses were greater at times when construction workers and operating staff overlapped (72%), particularly in areas of relatively high social class. For several sites the excesses were similar to or greater than that near the nuclear site of Sellafield (67%), which is distinctive in its large workforce with many construction workers. Seascale, near Sellafield, with a ninefold increase had an unusually high proportion of residents in social class I. The findings support the infection hypothesis and reinforce the view that the excess of childhood leukaemia and non-Hodgkin's lymphoma near Sellafield has a similar explanation. (author)

  17. Unit soil loss rate from various construction sites during a storm.

    Science.gov (United States)

    Maniquiz, Marla C; Lee, Soyoung; Lee, Eunju; Kong, Dong-Soo; Kim, Lee-Hyung

    2009-01-01

    The Korean Ministry of Environment (MOE) opts to establish an ordinance having a standard specifying an allowable soil loss rate applicable to construction projects. The predicted amount of soil loss from a construction site exceeding the standard can be used to calculate the percent reduction necessary to comply with the ordinance. This research was conducted to provide a basis to establish a standard by investigating the unit soil loss rates in the three phases of development: pre-construction, active construction and post construction based from 1,036 Environmental Impact Assessment (EIA) reports within the six-year period (2000-2005). Based on the findings, several factors affect the magnitude of soil loss rates particularly storm characteristics, site slope, soil type, location from rivers, as well as the type of construction activity. In general, the unit soil loss rates during the active construction phase are extremely higher in comparison to undisturbed areas; in magnitude of 7 to 80 times larger in urban areas and 18 to 585 times in rural areas. Only between 20 to 40 percent of the soil loss rates was contributed at pre- and post- construction phases indicating that the active construction phase is the most important phase to control.

  18. Analysis of the number of enlarged pores according to site, age, and sex.

    Science.gov (United States)

    Jung, H J; Ahn, J Y; Lee, J I; Bae, J Y; Kim, H L; Suh, H Y; Youn, J I; Park, M Y

    2018-02-02

    Increasing the number of enlarged pores causes cosmetic problems. The difference in the number of enlarged pores according to facial site, age, and sex is unclear. To analyze the distribution of the number of enlarged pores according to facial site, age, and sex. We analyzed the number of the enlarged pores and the percentage of wrinkles in the nose, forehead, and cheek from 434 polarized images. The measurement results were analyzed according to site, age, and sex. Relationship between enlarged pore counts and wrinkle severity was also analyzed. The study was conducted by using DermaVision,™ which can take cross-polarization, parallel polarization, and ultraviolet light images. The enlarged pores of the nose and forehead were more prominent than in the cheeks. Pore counts were increased with age, and the increment was significant between the 30's and 40's. There was no significant difference by gender. Enlarged pore counts were related to wrinkle severity. The number of enlarged pores differs depending on body site and increased with age. The enlarged pore counts correlate with wrinkle severity and the correlation varies depending on the body site. © 2018 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  19. Site infrastructure as required during the construction and erection of nuclear power plants

    International Nuclear Information System (INIS)

    Haas, K.F.; Wagner, H.

    1978-01-01

    In general, in an exchange of experience on constructing nuclear power plants priority is given to design and lay-out, financing, quality assurance etc., but in this paper an attempt has been made to describe range and type of site infrastructure required during construction and erection. Site infrastructure will make considerable demands on the planning, supply of material and maintenance that may result from the frequently very isolated location of power plant sites. Examples for specific values and experiences are given for a nuclear power plant with two units on the 1300-MW type at present under construction of the Persian Gulf in Iran. Data concerning the site infrastructure, including examples, are given and explained on the basis of graphs. The site is split up into a technical and a social infrastructure. The main concern of the technical site infrastructure is the timely provision and continuous availability of electric energy, water, communication grids, workshops, warehouses, offices, transport and handling facilities, as well as the provision of heavy load roads, harbour facilities, etc. The social site infrastructure in general comprises accommodation, food supplies and the care and welfare of all site personnel, which includes a hospital, school, self-service shop, and sport and recreation facilities. (author)

  20. Construction of a voxel model from CT images with density derived from CT numbers

    International Nuclear Information System (INIS)

    Cheng Mengyun; Zeng Qin; Cao Ruifen; Li Gui; Zheng Huaqing; Huang Shanqing; Song Gang; Wu Yican

    2010-01-01

    The voxel models representing human anatomy have been developed to calculate dose distribution in human body, while the density is the most important physical property of voxel model. Traditionally, when creating the Monte Carlo input files, the average tissue parameters recommended in ICRP report were used to assign each voxel in the existing voxel models. However, as each tissue consists of many voxels in which voxels are different in their densities, the method of assigning average tissue parameters doesn't take account of the voxel's discrepancy, and can't represent human anatomy faithfully. To represent human anatomy more faithfully, a method was implemented to assign each voxel, the density of which was derived from CT number. In order to compare with the traditional method, we have constructed two models from a same cadaver specimen date set. A CT-based pelvic voxel model called Pelvis-CT model, was constructed, the densities of which were derived from the CT numbers. A color photograph-based pelvic voxel model called Pelvis-Photo model, was also constructed, the densities of which were taken from ICRP Publication. The CT images and color photographs were obtained from the same female cadaver specimen. The Pelvis-CT and Pelvis-Photo models were ported into Monte Carlo code MCNP to calculate the conversion coefficients from kerma free-in-air to absorbed dose for external monoenergetic photon beams with energies of 0.1, 1 and 10 MeV under anterior-posterior (AP) geometries. The results were compared with those of given in ICRP74. Differences of up to 50% were observed between conversion coefficients of Pelvis-CT and Pelvis-Photo models, moreover the discrepancies decreased for the photon beams with higher energies. The overall trend of conversion coefficients of the Pelvis-CT model were agreed well with that of ICRP74 data. (author)

  1. Construction of a voxel model from CT images with density derived from CT numbers

    International Nuclear Information System (INIS)

    Cheng Mengyun; Zeng Qin; Cao Ruifen; Li Gui; Zheng Huaqing; Huang Shanqing; Song Gang; Wu Yican

    2011-01-01

    The voxel models representing human anatomy have been developed to calculate dose distribution in human body, while the density and elemental composition are the most important physical properties of voxel model. Usually, when creating the Monte Carlo input files, the average tissue densities recommended in ICRP Publication were used to assign each voxel in the existing voxel models. As each tissue consists of many voxels with different densities, the conventional method of average tissue densities failed to take account of the voxel's discrepancy, and therefore could not represent human anatomy faithfully. To represent human anatomy more faithfully, a method was implemented to assign each voxel, the densities of which were derived from CT number. In order to compare with the traditional method, we constructed two models from the cadaver specimen dataset. A CT-based pelvic voxel model called Pelvis-CT model was constructed, the densities of which were derived from the CT numbers. A color photograph-based pelvic voxel model called Pelvis-Photo model was also constructed, the densities of which were taken from ICRP Publication. The CT images and the color photographs were obtained from the same female cadaver specimen. The Pelvis-CT and Pelvis-Photo models were both ported into Monte Carlo code MCNP to calculate the conversion coefficients from kerma free-in-air to absorbed dose for external monoenergetic photon beams with energies of 0.1, 1 and 10 MeV under anterior-posterior (AP) geometry. The results were compared with those of given in ICRP Publication 74. Differences of up to 50% were observed between conversion coefficients of Pelvis-CT and Pelvis- Photo models, moreover the discrepancies decreased for the photon beams with higher energies. The overall trend of conversion coefficients of the Pelvis-CT model agreed well with that of ICRP Publication 74 data. (author)

  2. Study of relationship between time overrun and productivity on construction sites

    Directory of Open Access Journals (Sweden)

    Ameh, Oko John

    2011-12-01

    Full Text Available The history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. In an attempt to reverse this trend, this study aims at establishing the relationship between time overrun and labour productivity on construction sites in Lagos, Nigeria. 43 technical and management staff of some medium and large construction firms based in Lagos, Nigeria were sampled and administered a questionnaire survey. The questionnaire contained 18 causes of project time overrun and 14 causes of low labour productivity which had been identified from the literature reviewed. With these a relationship between project time overrun and low labour productivity was established. Both descriptive and inferential statistics were used in analyzing the data. Results indicate that inadequate funds for the project, inadequate planning before project takeoff, inadequate tools and equipment and delay in delivery of material top the list of major causes of time overrun while the use of wrong construction methods, inadequate construction materials and inaccurate drawing/specification are the key factors causing low labour productivity on construction sites. Significant negative relationship was found between time overrun and labour productivity in construction sites in Nigeria. The study concludes by recommending that early appointment of project managers could ensure proper management of both the human and material resources that could guarantee improved productivity and ultimately save projects from time overrun.

  3. Site characterization progress report: Yucca Mountain, Nevada, April 1, 1990--September 30, 1990, Number 3

    International Nuclear Information System (INIS)

    1991-03-01

    In accordance with the requirements of Section 113(b)(3) of the Nuclear Waste Policy Act of 1982 (NWPA), as amended, the US Department of Energy has prepared this report on the progress of site characterization activities at Yucca Mountain, Nevada, for the period April 1 through September 30, 1990. This report is the third of a series of reports that are issued at intervals of approximately six months during site characterization. The report covers a number of new initiatives to improve the effectiveness of the site characterization program and covers continued efforts related to preparatory activities, study plans, and performance assessment. 85 refs., 2 figs., 3 tabs

  4. Modeling injury rates as a function of industrialized versus on-site construction techniques.

    Science.gov (United States)

    Rubio-Romero, J C; Suárez-Cebador, M; Abad, Jesús

    2014-05-01

    It is often predicted that the industrialization of building activities will lead to a reduction of accident rates in the construction sector, particularly as a result of switching activities from building sites to factories. However, to date no scientific research has provided objective quantitative results to back up this claim. The aim of this paper is to evaluate how industrialization affects the accident rate in different industrialized building systems in Spain. Our results revealed that the industrialized steel modular system presents the lowest accident rate, while the highest accident rate was recorded in the construction method with cast-in-place concrete. The lightweight construction system also presents a high accident rate. Accordingly, industrialized building systems cannot claim to be safer than traditional ones. The different types of "on-site work" seem to be the main variable which would explain the accident rates recorded in industrialized construction systems. Copyright © 2014 Elsevier Ltd. All rights reserved.

  5. Smooth Operator - Mobile Information Technology for Improved Flow at the Construction Site

    DEFF Research Database (Denmark)

    Tambo, Torben

    2010-01-01

    is used; mobility is classified as remote, local or micro. Furthermore an extensive literature study is employed along with both market screening for systems and case studies of companies adopting as well as rejecting the technology. Both within research communities, software manufacturers......Mobile information technology (IT) seems an ideal innovation to promote effectiveness of the construction process, particularly at the construction site; research has over the last 15 years focused on solutions, potentials and barriers with this field. This paper aim at the duality between research...... and industry for an updated and forward looking comprehension, and view of tendencies, of the roles and potentials of mobile IT at the construction site including potential for further research. Qualitative and interpretive methodology inspired by information systems and sociology of research and construction...

  6. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    Directory of Open Access Journals (Sweden)

    Spillane, John P

    2011-12-01

    Full Text Available The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

  7. Priority and construction sites of water storage in a watershed in response to climate change

    Science.gov (United States)

    Lin, Cheng-Yu; Zhang, Wen-Yan; Lin, Chao-Yuan

    2014-05-01

    Taiwan is located at the Eastern Asia Monsoon climate zone. Typhoons and/or convectional rains occur frequently and result in high intensity storms in the summer season. Once the detention facilities are shortage or soil infiltration rate become worse in a watershed due to land use, surface runoff is easily to concentrate and threaten the protected areas. Therefore, it is very important to examine the functionality of water storage for a watershed. The purpose of this study is to solve the issue of flooding in the Puzi Creek. A case study of Yizen Bridge Watershed, in which the SCS curve number was used as an index to extract the spatial distribution of the strength of water storage, and the value of watershed mean CN along the main channel was calculated using area-weighting method. Therefore, the hotspot management sites were then derived and the priority method was applied to screen the depression sites for the reference of management authorities in detention ponds placement. The results show that the areas of subzone A with the characteristics of bad condition in topography and soil, which results in poor infiltration. However, the areas are mostly covered with forest and are difficult to create the artificial water storage facilities. Detention dams are strongly recommended at the site of depression in the river channel to decrease discharge velocity and reduce impact from flood disaster. The areas of subzone B are mainly located at the agriculture slope land. The topographic depressions in the farmland are the suitable places to construct the farm ponds for the use of flood detention and sediment deposition in the rainy seasons and irrigation in the dry seasons. Areas of subzone C are mainly occupied the gentle slope land with a better ability in water storage due to low CN value. Farm ponds constructed in the riparian to bypass the nearby river channel can create multifunctional wetland to effectively decrease the peak discharge in the downstream during

  8. Prototype Environmental Assessment of the impacts of siting and construction of an SPS ground receiving station

    Science.gov (United States)

    Hill, J.

    1980-01-01

    A prototype assessment of the environmental impacts of siting and constructing a Satellite Power System (SPS) Ground Receiving Station (GRS) is reported. The objectives of the study were: (1) to develop an assessment of the nonmicrowave related impacts of the reference system SPS GRS on the natural environment; (2) to assess the impacts of GRS construction and operations in the context of actual baseline data for a site in the California desert; and (3) to identify critical GRS characteristics or parameters that are most significant in terms of the natural environment.

  9. Safety leadership at construction sites: the importance of rule-oriented and participative leadership.

    Science.gov (United States)

    Grill, Martin; Pousette, Anders; Nielsen, Kent; Grytnes, Regine; Törner, Marianne

    2017-07-01

    Objectives The construction industry accounted for >20% of all fatal occupational accidents in Europe in 2014. Leadership is an essential antecedent to occupational safety. The aim of the present study was to assess the influence of transformational, active transactional, rule-oriented, participative, and laissez-faire leadership on safety climate, safety behavior, and accidents in the Swedish and Danish construction industry. Sweden and Denmark are similar countries but have a large difference in occupational accidents rates. Methods A questionnaire study was conducted among a random sample of construction workers in both countries: 811 construction workers from 85 sites responded, resulting in site and individual response rates of 73% and 64%, respectively. Results The results indicated that transformational, active transactional, rule-oriented and participative leadership predict positive safety outcomes, and laissez-faire leadership predict negative safety outcomes. For example, rule-oriented leadership predicts a superior safety climate (β=0.40, Pleadership on workers' safety behavior was moderated by the level of participative leadership (β=0.10, Pleadership behaviors on safety outcomes were largely similar in Sweden and Denmark. Rule-oriented and participative leadership were more common in the Swedish than Danish construction industry, which may partly explain the difference in occupational accident rates. Conclusions Applying less laissez-faire leadership and more transformational, active transactional, participative and rule-oriented leadership appears to be an effective way for construction site managers to improve occupational safety in the industry.

  10. Selection of nest-site habitat by interior least terns in relation to sandbar construction

    Science.gov (United States)

    Sherfy, Mark H.; Stucker, Jennifer H.; Buhl, Deborah A.

    2012-01-01

    Federally endangered interior least terns (Sternula antillarum) nest on bare or sparsely vegetated sandbars on midcontinent river systems. Loss of nesting habitat has been implicated as a cause of population declines, and managing these habitats is a major initiative in population recovery. One such initiative involves construction of mid-channel sandbars on the Missouri River, where natural sandbar habitat has declined in quantity and quality since the late 1990s. We evaluated nest-site habitat selection by least terns on constructed and natural sandbars by comparing vegetation, substrate, and debris variables at nest sites (n = 798) and random points (n = 1,113) in bare or sparsely vegetated habitats. Our logistic regression models revealed that a broader suite of habitat features was important in nest-site selection on constructed than on natural sandbars. Odds ratios for habitat variables indicated that avoidance of habitat features was the dominant nest-site selection process on both sandbar types, with nesting terns being attracted to nest-site habitat features (gravel and debris) and avoiding vegetation only on constructed sandbars, and avoiding silt and leaf litter on both sandbar types. Despite the seemingly uniform nature of these habitats, our results suggest that a complex suite of habitat features influences nest-site choice by least terns. However, nest-site selection in this social, colonially nesting species may be influenced by other factors, including spatial arrangement of bare sand habitat, proximity to other least terns, and prior habitat occupancy by piping plovers (Charadrius melodus). We found that nest-site selection was sensitive to subtle variation in habitat features, suggesting that rigor in maintaining habitat condition will be necessary in managing sandbars for the benefit of least terns. Further, management strategies that reduce habitat features that are avoided by least terns may be the most beneficial to nesting least terns.

  11. Facile Site-Directed Mutagenesis of Large Constructs Using Gibson Isothermal DNA Assembly.

    Science.gov (United States)

    Yonemoto, Isaac T; Weyman, Philip D

    2017-01-01

    Site-directed mutagenesis is a commonly used molecular biology technique to manipulate biological sequences, and is especially useful for studying sequence determinants of enzyme function or designing proteins with improved activity. We describe a strategy using Gibson Isothermal DNA Assembly to perform site-directed mutagenesis on large (>~20 kbp) constructs that are outside the effective range of standard techniques such as QuikChange II (Agilent Technologies), but more reliable than traditional cloning using restriction enzymes and ligation.

  12. The Discursive Construction of Teachers’ Desirable Identity on a Social Networking Site

    Directory of Open Access Journals (Sweden)

    Radzuwan Ab Rashid

    2016-09-01

    Full Text Available This study is situated in the broader identity-construction literature. Bringing discourse community theory to examine teachers’ postings on Facebook Timelines, we explored how teachers discursively construct socially desirable identities to fit into the Timeline community. Data were gathered from the Status updates and Comments on 29 Timelines belonged to Malaysian English language teachers who were purposively chosen as they often posted and commented on teaching-related issues on their Timelines. The analysis shows that the commonest form of identity construction on the teachers’ Timelines was as an engager which had been carefully constructed to portray positive self-image. This paper concludes that when participating on a public networking site, the teachers were being strategic as not to construct identities which could tarnish their professional image.

  13. Climatic and psychosocial risks of heat illness incidents on construction site.

    Science.gov (United States)

    Jia, Yunyan Andrea; Rowlinson, Steve; Ciccarelli, Marina

    2016-03-01

    The study presented in this paper aims to identify prominent risks leading to heat illness in summer among construction workers that can be prioritised for developing effective interventions. Samples are 216 construction workers' cases at the individual level and 26 construction projects cases at the organisation level. A grounded theory is generated to define the climatic heat and psychosocial risks and the relationships between risks, timing and effectiveness of interventions. The theoretical framework is then used to guide content analysis of 36 individual onsite heat illness cases to identify prominent risks. The results suggest that heat stress risks on construction site are socially constructed and can be effectively managed through elimination at supply chain level, effective engineering control, proactive control of the risks through individual interventions and reactive control through mindful recognition and response to early symptoms. The role of management infrastructure as a base for effective interventions is discussed. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  14. Pseudo-random-number generators and the square site percolation threshold.

    Science.gov (United States)

    Lee, Michael J

    2008-09-01

    Selected pseudo-random-number generators are applied to a Monte Carlo study of the two-dimensional square-lattice site percolation model. A generator suitable for high precision calculations is identified from an application specific test of randomness. After extended computation and analysis, an ostensibly reliable value of p_{c}=0.59274598(4) is obtained for the percolation threshold.

  15. Enhanced On-Site Waste Management of Plasterboard in Construction Works: A Case Study in Spain

    Directory of Open Access Journals (Sweden)

    Ana Jiménez-Rivero

    2017-03-01

    Full Text Available On-site management of construction waste commonly determines its destination. In the case of plasterboard (PB, on-site segregation becomes crucial for closed-loop recycling. However, PB is commonly mixed with other wastes in Spain. In this context, the involvement of stakeholders that can contribute to reversing this current situation is needed. This paper analyzes on-site waste management of PB in Spain through a pilot study of a construction site, with the main objective of identifying best practices to increase waste prevention, waste minimization, and the recyclability of the waste. On-site visits and structured interviews were conducted. The results show five management stages: PB distribution (I; PB installation (II; Construction waste storage at the installation area (III; PB waste segregation at the installation area (IV and PB waste transfer to the PB container and storage (V. The proposed practices refer to each stage and include the merging of Stages III and IV. This measure would avoid the mixing of waste fractions in Stage III, maximizing the recyclability of PB. In addition, two requisites for achieving enhanced management are analyzed: ‘Training and commitment’ and ‘fulfilling the requirements established by the current regulation’. The results show that foremen adopted a more pessimistic attitude than installers towards a joint commitment for waste management. Moreover, not all supervisors valued the importance of a site waste management plan, regulated by the Royal Decree 105/2008 in Spain.

  16. Design and implementation of an identification system in construction site safety for proactive accident prevention.

    Science.gov (United States)

    Yang, Huanjia; Chew, David A S; Wu, Weiwei; Zhou, Zhipeng; Li, Qiming

    2012-09-01

    Identifying accident precursors using real-time identity information has great potential to improve safety performance in construction industry, which is still suffering from day to day records of accident fatality and injury. Based on the requirements analysis for identifying precursor and the discussion of enabling technology solutions for acquiring and sharing real-time automatic identification information on construction site, this paper proposes an identification system design for proactive accident prevention to improve construction site safety. Firstly, a case study is conducted to analyze the automatic identification requirements for identifying accident precursors in construction site. Results show that it mainly consists of three aspects, namely access control, training and inspection information and operation authority. The system is then designed to fulfill these requirements based on ZigBee enabled wireless sensor network (WSN), radio frequency identification (RFID) technology and an integrated ZigBee RFID sensor network structure. At the same time, an information database is also designed and implemented, which includes 15 tables, 54 queries and several reports and forms. In the end, a demonstration system based on the proposed system design is developed as a proof of concept prototype. The contributions of this study include the requirement analysis and technical design of a real-time identity information tracking solution for proactive accident prevention on construction sites. The technical solution proposed in this paper has a significant importance in improving safety performance on construction sites. Moreover, this study can serve as a reference design for future system integrations where more functions, such as environment monitoring and location tracking, can be added. Copyright © 2011 Elsevier Ltd. All rights reserved.

  17. Evaluation of Acquisition Strategies for Image-Based Construction Site Monitoring

    Science.gov (United States)

    Tuttas, S.; Braun, A.; Borrmann, A.; Stilla, U.

    2016-06-01

    Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM). The BIM contains the as-planned states (geometry, schedule, costs, ...) of a construction project. For updating, the as-built state has to be acquired repeatedly and compared to the as-planned state. In the approach presented here, a 3D representation of the as-built state is calculated from photogrammetric images using multi-view stereo reconstruction. On construction sites one has to cope with several difficulties like security aspects, limited accessibility, occlusions or construction activity. Different acquisition strategies and techniques, namely (i) terrestrial acquisition with a hand-held camera, (ii) aerial acquisition using a Unmanned Aerial Vehicle (UAV) and (iii) acquisition using a fixed stereo camera pair at the boom of the crane, are tested on three test sites. They are assessed considering the special needs for the monitoring tasks and limitations on construction sites. The three scenarios are evaluated based on the ability of automation, the required effort for acquisition, the necessary equipment and its maintaining, disturbance of the construction works, and on the accuracy and completeness of the resulting point clouds. Based on the experiences during the test cases the following conclusions can be drawn: Terrestrial acquisition has the lowest requirements on the device setup but lacks on automation and coverage. The crane camera shows the lowest flexibility but the highest grade of automation. The UAV approach can provide the best coverage by combining nadir and oblique views, but can be limited by obstacles and security aspects. The accuracy of the point clouds is evaluated based on plane fitting of selected building parts. The RMS errors of the fitted parts range from 1 to a few cm for the UAV and the hand-held scenario. First results show that the crane camera

  18. EVALUATION OF ACQUISITION STRATEGIES FOR IMAGE-BASED CONSTRUCTION SITE MONITORING

    Directory of Open Access Journals (Sweden)

    S. Tuttas

    2016-06-01

    Full Text Available Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM. The BIM contains the as-planned states (geometry, schedule, costs, ... of a construction project. For updating, the as-built state has to be acquired repeatedly and compared to the as-planned state. In the approach presented here, a 3D representation of the as-built state is calculated from photogrammetric images using multi-view stereo reconstruction. On construction sites one has to cope with several difficulties like security aspects, limited accessibility, occlusions or construction activity. Different acquisition strategies and techniques, namely (i terrestrial acquisition with a hand-held camera, (ii aerial acquisition using a Unmanned Aerial Vehicle (UAV and (iii acquisition using a fixed stereo camera pair at the boom of the crane, are tested on three test sites. They are assessed considering the special needs for the monitoring tasks and limitations on construction sites. The three scenarios are evaluated based on the ability of automation, the required effort for acquisition, the necessary equipment and its maintaining, disturbance of the construction works, and on the accuracy and completeness of the resulting point clouds. Based on the experiences during the test cases the following conclusions can be drawn: Terrestrial acquisition has the lowest requirements on the device setup but lacks on automation and coverage. The crane camera shows the lowest flexibility but the highest grade of automation. The UAV approach can provide the best coverage by combining nadir and oblique views, but can be limited by obstacles and security aspects. The accuracy of the point clouds is evaluated based on plane fitting of selected building parts. The RMS errors of the fitted parts range from 1 to a few cm for the UAV and the hand-held scenario. First results show that the crane

  19. Industrial hygiene survey report of Millstone Nuclear Power Station No. 3 construction site, Waterford, Connecticut

    International Nuclear Information System (INIS)

    Zaebst, D.D.; Herrick, R.

    1985-11-01

    Personal and area air samples were analyzed for total dust, organic solvent vapors, and metals during spray, brush, and roller painting and paint removal operations at Millstone Nuclear Power Station Number 3 construction site, Waterford, Connecticut, March 1981. Solvent exposures were generally well below their relevant standards. Total dust exposures during paint removal ranged up to 1,000 milligrams per cubic meter (mg/m3) in the containment building. The OSHA standard for total dust is 15mg/m3. Exposures to lead dusts exceeded the OSHA standard of 0.05mg/m3 in the turbine, auxiliary, and containment buildings. Chromium exposures were generally below the OSHA standard of 1mg/m3, except for 2.4mg/m3 in a personal sample taken during paint removal in the containment building. Very few engineering controls other than 3M single use respirators were observed. The authors note that the chromium exposure data is difficult to interpret as the form of the chromium is not known. If the chromium existed as hexavalent chromium exposure was excessive. The authors conclude that in view of the measured exposures to total dust, lead, and chromium, engineering controls and respiratory protection are inadequate. Recommendations include implementing better controls and respiratory protection

  20. Workers’ Age and the Impact of Psychological Factors on the Perception of Safety at Construction Sites

    Directory of Open Access Journals (Sweden)

    Muhammad Dawood Idrees

    2017-05-01

    Full Text Available The safety of construction workers is always a major concern at construction sites as the construction industry is inherently dangerous with many factors influencing worker safety. Several studies concluded that psychological factors such as workload, organizational relationships, mental stress, job security, and job satisfaction have significant effects on workers’ safety. However, research on psychological factors that are characteristic of different age groups have been limited. The aim of this study was to examine the impact of psychological factors on the perception of worker safety for two different age groups. After an extensive literature review, different psychological factors were identified, and a hypothetical research model was developed based on psychological factors that could affect workers’ perception of safety. A survey instrument was developed, and data were collected from seven different construction sites in Pakistan. Structural equation modeling (SEM was employed to test the hypothetical model for both age groups. The results revealed that workload and job satisfaction are significantly dominant factors on workers’ perception of safety in older workers, whereas organizational relationships, mental stress, and job security are dominant factors for younger workers at construction sites.

  1. The motivational safety helmet : Redesign suggestions improving the intrinsic motivation of construction site workers

    NARCIS (Netherlands)

    Beldman, T. (Teunis); Boer, de J. (Johannes); Lemmens, P. (Pim); Stilma, M. (Margot)

    2014-01-01

    In reaction to the lack of intrinsic motivation of construction site workers, to wear their safety helmets at all times, a series of research projects studied causes and possible solutions. Goal is to gain an inspirational discussion to get the design onto the next level. This paper describes a

  2. Usability evaluation of mobile ICT support used at the building construction site

    DEFF Research Database (Denmark)

    Christiansson, Per; Svidt, Kjeld

    2006-01-01

    The paper summarizes findings from field evaluations and controlled laboratory usability evaluations of new mobile Information and Communication Technology, ICT, support used by craftsmen at construction sites as well as a discussion of methodologies for user centred ICT tools design. The finding...

  3. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  4. Engineered surface barriers for waste disposal sites: lysimeter facility design and construction

    International Nuclear Information System (INIS)

    Phillips, S.J.; Ruben, M.S.; Kirkham, R.R.

    1988-01-01

    A facility to evaluate performance of engineered surface carriers for confinement of buried wastes has been designed, constructed, and operations initiated. The Field Lysimeter Test Facility is located at the US Department of Energy's Hanford Site in Richland, Washington. The facility consists of 18 one-dimensional drainage and weighing lysimeters used to evaluate 7 replicated barrier treatments. Distinct layers of natural earth materials were used to construct layered soil and rock barriers in each lysimeter. These barrier designs are capable in principal of significantly reducing or precluding infiltration of meteoric water through barriers into underlying contaminated zones. This paper summarizes salient facility design and construction features used in testing of the Hanford Site's engineered surface barriers

  5. Differences among Job Positions Related to Communication Errors at Construction Sites

    Science.gov (United States)

    Takahashi, Akiko; Ishida, Toshiro

    In a previous study, we classified the communicatio n errors at construction sites as faulty intention and message pattern, inadequate channel pattern, and faulty comprehension pattern. This study seeks to evaluate the degree of risk of communication errors and to investigate differences among people in various job positions in perception of communication error risk . Questionnaires based on the previous study were a dministered to construction workers (n=811; 149 adminis trators, 208 foremen and 454 workers). Administrators evaluated all patterns of communication error risk equally. However, foremen and workers evaluated communication error risk differently in each pattern. The common contributing factors to all patterns wer e inadequate arrangements before work and inadequate confirmation. Some factors were common among patterns but other factors were particular to a specific pattern. To help prevent future accidents at construction sites, administrators should understand how people in various job positions perceive communication errors and propose human factors measures to prevent such errors.

  6. Improving construction site safety through leader-based verbal safety communication.

    Science.gov (United States)

    Kines, Pete; Andersen, Lars P S; Spangenberg, Soren; Mikkelsen, Kim L; Dyreborg, Johnny; Zohar, Dov

    2010-10-01

    The construction industry is one of the most injury-prone industries, in which production is usually prioritized over safety in daily on-site communication. Workers have an informal and oral culture of risk, in which safety is rarely openly expressed. This paper tests the effect of increasing leader-based on-site verbal safety communication on the level of safety and safety climate at construction sites. A pre-post intervention-control design with five construction work gangs is carried out. Foremen in two intervention groups are coached and given bi-weekly feedback about their daily verbal safety communications with their workers. Foremen-worker verbal safety exchanges (experience sampling method, n=1,693 interviews), construction site safety level (correct vs. incorrect, n=22,077 single observations), and safety climate (seven dimensions, n=105 questionnaires) are measured over a period of up to 42 weeks. Baseline measurements in the two intervention and three control groups reveal that foremen speak with their workers several times a day. Workers perceive safety as part of their verbal communication with their foremen in only 6-16% of exchanges, and the levels of safety at the sites range from 70-87% (correct observations). Measurements from baseline to follow-up in the two intervention groups reveal that safety communication between foremen and workers increases significantly in one of the groups (factor 7.1 increase), and a significant yet smaller increase is found when the two intervention groups are combined (factor 4.6). Significant increases in the level of safety are seen in both intervention groups (7% and 12% increases, respectively), particularly in regards to 'access ways' and 'railings and coverings' (39% and 84% increases, respectively). Increases in safety climate are seen in only one of the intervention groups with respect to their 'attention to safety.' No significant trend changes are seen in the three control groups on any of the three measures

  7. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    International Nuclear Information System (INIS)

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete

  8. Status of the Texas low-level radioactive waste disposal site - construction sequencing and staffing patterns

    International Nuclear Information System (INIS)

    Jacobi, L.R. Jr.

    1996-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority, an agency of the State of Texas, has been attempting to develop a site for the disposal of low-level radioactive waste in Texas for more than fourteen years. Since 1991, the agency has been evaluating a site near Sierra Blanca, in far west Texas. Site characterization was completed in 1992, and a license application was filed that year. Construction plans were completed in 1993. In April 1996, the licensing agency, the Texas Natural Resource Conservation Commission, completed its review and proposed to issue a license. The administrative hearings on the proposed license should be completed by July 1997. The Authority is prepared to begin construction and operations as soon as a final license can be issued

  9. Late-Holocene climate evolution at the WAIS Divide site, West Antarctica: Bubble number-density estimates

    Science.gov (United States)

    Fegyveresi, John M.; Alley, R.B.; Spencer, M.K.; Fitzpatrick, J.J.; Steig, E.J.; White, J.W.C.; McConnell, J.R.; Taylor, K.C.

    2011-01-01

    A surface cooling of ???1.7??C occurred over the ???two millennia prior to ???1700 CE at the West Antarctic ice sheet (WAIS) Divide site, based on trends in observed bubble number-density of samples from the WDC06A ice core, and on an independently constructed accumulation-rate history using annual-layer dating corrected for density variations and thinning from ice flow. Density increase and grain growth in polar firn are both controlled by temperature and accumulation rate, and the integrated effects are recorded in the number-density of bubbles as the firn changes to ice. Numberdensity is conserved in bubbly ice following pore close-off, allowing reconstruction of either paleotemperature or paleo-accumulation rate if the other is known. A quantitative late-Holocene paleoclimate reconstruction is presented for West Antarctica using data obtained from the WAIS Divide WDC06A ice core and a steady-state bubble number-density model. The resultant temperature history agrees closely with independent reconstructions based on stable-isotopic ratios of ice. The ???1.7??C cooling trend observed is consistent with a decrease in Antarctic summer duration from changing orbital obliquity, although it remains possible that elevation change at the site contributed part of the signal. Accumulation rate and temperature dropped together, broadly consistent with control by saturation vapor pressure.

  10. Virtual Prototyping for Construction Site Co2 Emissions and Hazard Detection

    Directory of Open Access Journals (Sweden)

    Johnny Kwok Wai Wong

    2014-08-01

    Full Text Available The need for an efficient means of managing emissions and identifying potential hazard black spots in construction processes effectively and at the lowest cost possible has been highlighted in the construction sector. This study illustrates an integrated 5D model developed for quantifying carbon emissions and simulating the pattern of emissions of construction processes as a whole using virtual prototyping technologies. The predicted construction emissions data for each activity is generated and plotted to visually demonstrate the emission rates alongside the integrated four-dimensional VP framework of the construction project. The model also consists of a pro-active construction management system (PCMS, which assist the project team to detect sources of danger to on-site workers and provide pro-active warnings to them so as to avoid fatal accidents that are often caused by falling from heights and being struck by moving objects. A Hong Kong high-rise housing development project is used to exhibit the application of the carbon emission visualisation and potential accident detection system. This tool aims to encourage construction industry practitioners to become more environmentally conscious and pro-active in carbon mitigation and safety performance.

  11. THREE-DIMENSIONAL GEOFILTRATIONAL MODEL OF THE ROGUN HYDRO POWER PLANT CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Khokhotva Sergey Nikolaevich

    2017-05-01

    Full Text Available The article deals with technique of creation and results of calculations of the three-dimensional geofiltrational model of the Rogun HPP construction site. When performing works on creation of the Rogun HPP three-dimensional geofiltration model, geological and hydrogeological conditions of the Rogun HPP construction site were analyzed. They showed that the construction site consists mostly of fractured rocks of various weathering degrees. In terms of preservation, four preservation zones were identified in the rock mass. These zones define the features of hydrogeological conditions that have emerged in the area of construction. Calculation results illustrated the absence of seepage areas on the lower slope of dam; this is the indication of normal operation of the dam impervious circuit. The drainage system of the underground hydropower plant has a high efficiency. Operation of the drainage galleries complex leads to a significant reduction of piezometric pressure on roofs of the machine and transformer halls. Above the underground structures a completely drained area is formed. Completed forecast calculations on geofiltration model of the Rogun hydropower plant determine the hydrostatic pressure and piezometric pressure at any point of the modeled area. These data can be used as loads while designing of lining of underground workings.

  12. Guidance for RNA-seq co-expression network construction and analysis: safety in numbers.

    Science.gov (United States)

    Ballouz, S; Verleyen, W; Gillis, J

    2015-07-01

    RNA-seq co-expression analysis is in its infancy and reasonable practices remain poorly defined. We assessed a variety of RNA-seq expression data to determine factors affecting functional connectivity and topology in co-expression networks. We examine RNA-seq co-expression data generated from 1970 RNA-seq samples using a Guilt-By-Association framework, in which genes are assessed for the tendency of co-expression to reflect shared function. Minimal experimental criteria to obtain performance on par with microarrays were >20 samples with read depth >10 M per sample. While the aggregate network constructed shows good performance (area under the receiver operator characteristic curve ∼0.71), the dependency on number of experiments used is nearly identical to that present in microarrays, suggesting thousands of samples are required to obtain 'gold-standard' co-expression. We find a major topological difference between RNA-seq and microarray co-expression in the form of low overlaps between hub-like genes from each network due to changes in the correlation of expression noise within each technology. jgillis@cshl.edu or sballouz@cshl.edu Networks are available at: http://gillislab.labsites.cshl.edu/supplements/rna-seq-networks/ and supplementary data are available at Bioinformatics online. © The Author 2015. Published by Oxford University Press. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  13. Multipartite Bell-type inequalities for arbitrary numbers of settings and outcomes per site

    International Nuclear Information System (INIS)

    Loubenets, Elena R

    2008-01-01

    We introduce a single general representation incorporating in a unique manner all Bell-type inequalities for a multipartite correlation scenario with an arbitrary number of settings and any spectral type of outcomes at each site. Specifying this general representation for correlation functions, we prove that the form of any correlation Bell-type inequality does not depend on spectral types of outcomes, in particular, on their numbers at different sites, and is determined only by extremal values of outcomes at each site. We also specify the general form of bounds in Bell-type inequalities on joint probabilities. Our approach to the derivation of Bell-type inequalities is universal, concise and can be applied to a multipartite correlation experiment with outcomes of any spectral type, discrete or continuous. We, in particular, prove that, for an N-partite quantum state, possibly, infinite dimensional, admitting the N{2 x ... x 2}-setting LHV description, the Mermin-Klyshko inequality holds for any two bounded quantum observables per site, not necessarily dichotomic

  14. Quantifying and modeling soil erosion and sediment export from construction sites in southern California

    Science.gov (United States)

    Wernet, A. K.; Beighley, R. E.

    2006-12-01

    Soil erosion is a power process that continuously alters the Earth's landscape. Human activities, such as construction and agricultural practices, and natural events, such as forest fires and landslides, disturb the landscape and intensify erosion processes leading to sudden increases in runoff sediment concentrations and degraded stream water quality. Understanding soil erosion and sediment transport processes is of great importance to researchers and practicing engineers, who routinely use models to predict soil erosion and sediment movement for varied land use and climate change scenarios. However, existing erosion models are limited in their applicability to constructions sites which have highly variable soil conditions (density, moisture, surface roughness, and best management practices) that change often in both space and time. The goal of this research is to improve the understanding, predictive capabilities and integration of treatment methodologies for controlling soil erosion and sediment export from construction sites. This research combines modeling with field monitoring and laboratory experiments to quantify: (a) spatial and temporal distribution of soil conditions on construction sites, (b) soil erosion due to event rainfall, and (c) potential offsite discharge of sediment with and without treatment practices. Field sites in southern California were selected to monitor the effects of common construction activities (ex., cut/fill, grading, foundations, roads) on soil conditions and sediment discharge. Laboratory experiments were performed in the Soil Erosion Research Laboratory (SERL), part of the Civil and Environmental Engineering department at San Diego State University, to quantify the impact of individual factors leading to sediment export. SERL experiments utilize a 3-m by 10-m tilting soil bed with soil depths up to 1 m, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). Preliminary modeling, field and laboratory

  15. Marked reduction in the number of platelet-tritiated imipramine binding sites in geriatric depression

    International Nuclear Information System (INIS)

    Nemeroff, C.B.; Knight, D.L.; Krishnan, R.R.; Slotkin, T.A.; Bissette, G.; Melville, M.L.; Blazer, D.G.

    1988-01-01

    The number (Bmax) and affinity (Kd) of platelet-tritiated imipramine binding sites was determined in young and middle-aged controls 50 years of age and younger (n = 25), elderly normal controls over 60 years of age (n = 18), patients who fulfilled DSM-III criteria for major depression who were under 50 years of age (n = 29), patients who fulfilled DSM-III criteria for major depression who were 60 years of age and older (n = 19), and patients who fulfilled both DSM-III criteria for primary degenerative dementia and National Institute of Neurological and Communicative Disorders and Stroke-Alzheimer's Disease and Related Disorders Association criteria for probable Alzheimer's disease (n = 13). Both groups of depressed patients (under 50 and over 60 years of age) exhibited significant reductions (decreases 42%) in the number of platelet-tritiated imipramine binding sites with no change in affinity, when compared with their age-matched controls. There was little overlap in Bmax values between the elderly depressed patients and their controls. The patients with probable Alzheimer's disease showed no alteration in platelet-tritiated imipramine binding. There was no statistically significant relationship between postdexamethasone plasma cortisol concentrations and tritiated imipramine binding. These results indicate that platelet-tritiated imipramine binding may have potential utility as a diagnostic adjunct in geriatric depression, and moreover that the reduction in the number of platelet-tritiated imipramine binding sites is not due to hypercortisolemia

  16. Site characterization and construction of a controlled shallow test site in central Mexico for archaeological and engineering applications

    Science.gov (United States)

    Rosado-Fuentes, A.; Arango-Galvan, C.; Arciniega-Ceballos, A.; Hernández-Quintero, J. E.; Mendo-Perez, G.

    2017-12-01

    A controlled shallow test site (CSTS) has been constructed at the UNAM Geomagnetic Observatory in Teoloyucan, central Mexico. The objective of the CSTS is to have a controlled place to test new developments and arrays that can be used for archaeological and engineering exploration, as well as to calibrate instruments, train students and for future research. The CSTS was built far enough not to influence the geomagnetic sensors and not be affected by noise sources. Special attention was given to the distribution and geometry of buried materials as well as the instruments used. Before the CSTS was built, a combination of near-surface, non-invasive geophysical techniques was performed to characterize the area of 20 by 32 meters. The methods include magnetometry, electromagnetic induction, ground penetrating radar (GPR), electrical resistivity tomography (ERT) and seismic refraction tomography (SRT). The GPR, SRT and ERT results show relatively flat interfaces. In general, the vertical gradient of the total magnetic field and the electric conductivity have very small variations, showing only one strong magnetic dipole associated to a shallow anomaly. These results indicate that the area is ideal for the construction of the test site. The CSTS consists on buried structures made with different materials and geometries (cubes, cylinders and tubes) commonly used as construction materials in Mexico since Pre-Hispanic times. These materials include concrete, reinforced concrete, wood, brick, adobe, basalt, tezontle and also empty space for controlling responses. The CSTS is versatile enough to be reshaped considering new geometries or materials and to conduct further investigations.

  17. Regulatory inspection activities on nuclear power plant sites during construction in the United Kingdom

    International Nuclear Information System (INIS)

    Jeffery, J.V.

    1977-01-01

    The work of regulatory inspection of the construction of the plant on the site is performed not only by the inspector who has been allocated to inspection duties for that site but also by the specialist staff who are involved with the safety assessment of the plant. The co-ordination of this work is described in the paper and examples are given of inspection activities associated with the enforcement requirements of licence conditions as well as those related to the inspection of the plant itself. (author)

  18. Sites of Memory and the Construction of Democracy: Spain and Chile

    Directory of Open Access Journals (Sweden)

    Maria Chiara Bianchini

    2014-11-01

    Full Text Available This article compares the histories of two sites of memory located in the capital cities of Spain and Chile. Both sites are considered outstanding symbols of the last military dictatorship and their evolution over the past decade reflects the difficult construction of public discourses on dictatorial violence. Both processes take place at the end of two transitions to democracies that have followed similar patterns and have interacted with each other in many ways. Still, these two societies have handled very differently the dictatorial past and its representations.

  19. The measurement of radon concentration of soil in a civil construction site

    International Nuclear Information System (INIS)

    Liu Hanbin; Fan Guang

    2004-01-01

    Radon is one of radioactive resources which do harm to human body. Therefore, its concentration in the soil should be measured before the civil construction works. Code for Indoor Environmental Pollution Control of Civil Building Engineering (GB50325-2001) is the main norm used for soil radon concentration measurement. By using FD-3017 RaA radon measuring equipment, the soil radon concentration in a civil building engineering site has been measured, the result shows that the concentration is lower than the regional average value, radon protective measures should not be installed in that site. (authors)

  20. Transferrin receptors on human reticulocytes: variation in site number in hematologic disorders

    International Nuclear Information System (INIS)

    Shumak, K.H.; Rachkewich, R.A.

    1984-01-01

    Assays of binding of 125iodine-labeled ( 125 I) human transferrin were used to study transferrin receptor sites on reticulocytes from 15 normal subjects and from 66 patients with various hematologic disorders. In normal subjects, few or no transferrin receptors were detected whereas the average number of receptors per reticulocyte varied greatly from patient to patient, ranging from 0 to 67,700 in samples, from 35 patients, on which Scatchard analysis of binding of [ 125 I]-transferrin was done. Marked heterogeneity in the number of reticulocyte transferrin receptors in different hematologic disorders was also found in assays with [ 125 I]-OKT9 (monoclonal antibody to the human transferrin receptor). The number of receptors was not correlated with either the reticulocyte count or the hemoglobin

  1. Criteria for the siting, construction, management and evaluation of low and intermediate activity radioactive waste stores

    International Nuclear Information System (INIS)

    Granero, J.J.

    1986-01-01

    The experience acquired by Spain for the storage of low and intermediate level radioactive wastes, is presented. General considerations related to the technology, financing, administrative measures and risk determination are done. The criteria of site selection for construction and management of the waste storage facility are described, evaluating the specific criteria for the licensing procedure, and taking in account the safety and the radiation protection during periods of the system operation. (M.C.K.) [pt

  2. Modeling injury rates as a function of industrialized versus on-site construction techniques

    OpenAIRE

    Rubio Romero, Juan Carlos; Suárez Cebador, Manuel; Abad Puente, Jesús

    2014-01-01

    It is often predicted that the industrialization of building activities will lead to a reduction of accident rates in the construction sector, particularly as a result of switching activities from building sites to factories. However, to date no scientific research has provided objective quantitative results to back up this claim. The aim of this paper is to evaluate how industrialization affects the accident rate in different industrialized building systems in Spain. Our results revealed tha...

  3. Number of active transcription factor binding sites is essential for the Hes7 oscillator

    Directory of Open Access Journals (Sweden)

    de Angelis Martin

    2006-02-01

    Full Text Available Abstract Background It is commonly accepted that embryonic segmentation of vertebrates is regulated by a segmentation clock, which is induced by the cycling genes Hes1 and Hes7. Their products form dimers that bind to the regulatory regions and thereby repress the transcription of their own encoding genes. An increase of the half-life of Hes7 protein causes irregular somite formation. This was shown in recent experiments by Hirata et al. In the same work, numerical simulations from a delay differential equations model, originally invented by Lewis, gave additional support. For a longer half-life of the Hes7 protein, these simulations exhibited strongly damped oscillations with, after few periods, severely attenuated the amplitudes. In these simulations, the Hill coefficient, a crucial model parameter, was set to 2 indicating that Hes7 has only one binding site in its promoter. On the other hand, Bessho et al. established three regulatory elements in the promoter region. Results We show that – with the same half life – the delay system is highly sensitive to changes in the Hill coefficient. A small increase changes the qualitative behaviour of the solutions drastically. There is sustained oscillation and hence the model can no longer explain the disruption of the segmentation clock. On the other hand, the Hill coefficient is correlated with the number of active binding sites, and with the way in which dimers bind to them. In this paper, we adopt response functions in order to estimate Hill coefficients for a variable number of active binding sites. It turns out that three active transcription factor binding sites increase the Hill coefficient by at least 20% as compared to one single active site. Conclusion Our findings lead to the following crucial dichotomy: either Hirata's model is correct for the Hes7 oscillator, in which case at most two binding sites are active in its promoter region; or at least three binding sites are active, in which

  4. Knowledge based expert system to minimise environmental pollution in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd; Desa, Mohamad Nor Mohamad [Civil Engineering, Universiti Tenaga Nasional, Kajang, Selangor (Malaysia); Basri, Noor Ezlin Ahmad [Civil Engineering, Universiti Tenaga Nasional, Kajang, Selangor (Malaysia)

    2011-07-01

    Construction activities generate enormous amount of erosion and sediments sediments that is the result of soil disturbance during construction activities, thus, will pollute the adjacent water bodies and make it unfeasible for different uses. This paper aimed to develop and create the main features of an expert system prototype (ESCES) for minimising erosion and sedimentation due to stormwater generated from the construction activities by recommending a feasible BMPs. Multi criteria Analysis (MCA) technique has been integrated so as to select the best control measure among many stormwater control alternatives. A questionnaire has been distributed to the relevant experts so as to rank the stormwater control measures to be used in the MCA technique. Using Visual Basic 6, Graphical User Interfaces (GUIs) were developed. The knowledge and experience were acquired from various textural sources (i.e. guidelines, manuals, literature, and human expert). Results from this study showed that the Best Management Practices (BMPs) reommended have good suited the site characteristics. As a conclusion from this study, the ESCES can be considered as part of the 'Green Technology Tool' since it helps in protecting the environment and preserve good quality of water adjacent to the construction sites in Malaysia.

  5. An application of the Pareto method in surveys to diagnose managers' and workers' perception of occupational safety and health on selected Polish construction sites.

    Science.gov (United States)

    Obolewicz, Jerzy; Dąbrowski, Andrzej

    2017-11-16

    The construction industry is an important sector of the economy in Poland. According to the National Labour Inspectorate (PIP) data of 2014, the number of victims of fatal accidents in the construction sector amounted to 80 as compared with 187 injured in all other sectors of economy in Poland. This article presents the results of surveys on the impact of construction worker behaviour on the occupational safety and health outcomes. The surveys took into account the point of view of both construction site management (tactical level) and construction workers (operational level). For the analysis of results, the method of numerical taxonomy and Pareto charts was employed, which allowed the authors to identify the areas of occupational safety and health at both an operational and a tactical level, in which improvement actions needed to be proposed for workers employed in micro, small, medium and large construction enterprises.

  6. Electrokinetic demonstration at Sandia National Laboratories: Use of transference numbers for site characterization and process evaluation

    International Nuclear Information System (INIS)

    Lindgren, E.R.; Mattson, E.D.

    1997-01-01

    Electrokinetic remediation is generally an in situ method using direct current electric potentials to move ionic contaminants and/or water to collection electrodes. The method has been extensively studied for application in saturated clayey soils. Over the past few years, an electrokinetic extraction method specific for sandy, unsaturated soils has been developed and patented by Sandia National Laboratories. A RCRA RD ampersand D permitted demonstration of this technology for the in situ removal of chromate contamination from unsaturated soils in a former chromic acid disposal pit was operated during the summer and fall of 1996. This large scale field test represents the first use of electrokinetics for the removal of heavy metal contamination from unsaturated soils in the United States and is part of the US EPA Superfund Innovative Technology Evaluation (SITE) Program. Guidelines for characterizing a site for electrokinetic remediation are lacking, especially for applications in unsaturated soil. The transference number of an ion is the fraction of the current carried by that ion in an electric field and represents the best measure of contaminant removal efficiency in most electrokinetic remediation processes. In this paper we compare the transference number of chromate initially present in the contaminated unsaturated soil, with the transference number in the electrokinetic process effluent to demonstrate the utility of evaluating this parameter

  7. Comparison of sources of submicron particle number concentrations measured at two sites in Rochester, NY.

    Science.gov (United States)

    Kasumba, John; Hopke, Philip K; Chalupa, David C; Utell, Mark J

    2009-09-01

    Sources contributing to the submicron particles (100-470 nm) measured between January 2002 and December 2007 at two different New York State Department of Environmental Conservation (NYS DEC) sites in Rochester, NY were identified and apportioned using a bilinear receptor model, positive matrix factorization (PMF). Measurements of aerosol size distributions and number concentrations for particles in the size range of 10-500 nm have been made since December 2001 to date in Rochester. The measurements are being made using a scanning mobility particle sizer (SMPS) consisting of a DMA and a CPC (TSI models 3071 and 3010, respectively). From December 2001 to March 2004, particle measurements were made at the NYS DEC site in downtown Rochester, but it was moved to the eastside of Rochester in May 2004. Each measurement period was divided into three seasons i.e., winter (December, January, and February), summer (June, July, and August), and the transitional periods (March, April, May, September, October, and November) so as to avoid experimental uncertainty resulting from too large season-to-season variability in ambient temperature and solar photon intensity that would lead to unstable/non-stationary size distributions. Therefore, the seasons were analyzed independently for possible sources. Ten sources were identified at both sites and these include traffic, nucleation, residential/commercial heating, industrial emissions, secondary nitrate, ozone- rich secondary aerosol, secondary sulfate, regionally transported aerosol, and a mixed source of nucleation and traffic. These results show that the measured total outdoor particle number concentrations in Rochester generally vary with similar temporal patterns, suggesting that the central monitoring site data can be used to estimate outdoor exposure in other parts of the city.

  8. Determining the number of samples required for decisions concerning remedial actions at hazardous waste sites

    International Nuclear Information System (INIS)

    Skiles, J.L.; Redfearn, A.; White, R.K.

    1991-01-01

    An important consideration for every risk analyst is how many field samples should be taken so that scientifically defensible decisions concerning the need for remediation of a hazardous waste site can be made. Since any plausible remedial action alternative must, at a minimum, satisfy the condition of protectiveness of human and environmental health, we propose a risk-based approach for determining the number of samples to take during remedial investigations rather than using more traditional approaches such as considering background levels of contamination or federal or state cleanup standards

  9. Determining the number of samples required for decisions concerning remedial actions at hazardous waste sites

    International Nuclear Information System (INIS)

    Skiles, J.L.; Redfearn, A.; White, R.K.

    1991-01-01

    The processing of collecting, analyzing, and assessing the data needed to make to make decisions concerning the cleanup of hazardous waste sites is quite complex and often very expensive. This is due to the many elements that must be considered during remedial investigations. The decision maker must have sufficient data to determine the potential risks to human health and the environment and to verify compliance with regulatory requirements, given the availability of resources allocated for a site, and time constraints specified for the completion of the decision making process. It is desirable to simplify the remedial investigation procedure as much as possible to conserve both time and resources while, simultaneously, minimizing the probability of error associated with each decision to be made. With this in mind, it is necessary to have a practical and statistically valid technique for estimating the number of on-site samples required to ''guarantee'' that the correct decisions are made with a specified precision and confidence level. Here, we will examine existing methodologies and then develop our own approach for determining a statistically defensible sample size based on specific guidelines that have been established for the risk assessment process

  10. Construction of Non-Perturbative, Unitary Particle-Antiparticle Amplitudes for Finite Particle Number Scattering Formalisms

    International Nuclear Information System (INIS)

    Lindesay, James V

    2002-01-01

    Starting from a unitary, Lorentz invariant two-particle scattering amplitude, we show how to use an identification and replacement process to construct a unique, unitary particle-antiparticle amplitude. This process differs from conventional on-shell Mandelstam s,t,u crossing in that the input and constructed amplitudes can be off-diagonal and off-energy shell. Further, amplitudes are constructed using the invariant parameters which are appropriate to use as driving terms in the multi-particle, multichannel nonperturbative, cluster decomposable, relativistic scattering equations of the Faddeev-type integral equations recently presented by Alfred, Kwizera, Lindesay and Noyes. It is therefore anticipated that when so employed, the resulting multi-channel solutions will also be unitary. The process preserves the usual particle-antiparticle symmetries. To illustrate this process, we construct a J=0 scattering length model chosen for simplicity. We also exhibit a class of physical models which contain a finite quantum mass parameter and are Lorentz invariant. These are constructed to reduce in the appropriate limits, and with the proper choice of value and sign of the interaction parameter, to the asymptotic solution of the nonrelativistic Coulomb problem, including the forward scattering singularity , the essential singularity in the phase, and the Bohr bound-state spectrum

  11. Risk factors for cardiovascular diseases among male workers of building construction site in Delhi

    Directory of Open Access Journals (Sweden)

    Mamta Parashar

    2017-01-01

    Full Text Available Background: Cardiovascular disease (CVD is mainly attributable to a combination of risk factors (RFs: tobacco use, alcohol use, high blood pressure, diabetes, unhealthy diet, and obesity which are amenable to interventions. Building construction workers are poor and vulnerable. They are also the victims of adverse working environmental conditions and subjected to health hazards of occupational origin. Objective: The aim was to study the RFs and associated sociodemographics for CVD among construction site workers. Materials and Methods: This cross-sectional study was conducted among construction site workers. A total of 172 male workers over the age of 18 years were included in the study. Modified World Health Organization Step-wise approach to chronic disease RF surveillance was used to collect data. The data were analyzed in SPSS version 17 and the Chi-square test was applied to analyze the qualitative data. Results: At least one RF for CVD was present in all the subjects, with majority (93.6% of them having at least two RFs. The presence of the RFs (moderate to high, 3–11 was found to be significantly associated with lower income group, unskilled workers, migration year <1, alcoholics, personal tobacco use, family history of tobacco use, and the low knowledge score regarding tobacco use (0–2. Conclusions: Community-based comprehensive behavioral and life style communication package should be established for workers to reduce the modifiable RFs of CVD.

  12. A suggested color scheme for reducing perception-related accidents on construction work sites.

    Science.gov (United States)

    Yi, June-seong; Kim, Yong-woo; Kim, Ki-aeng; Koo, Bonsang

    2012-09-01

    Changes in workforce demographics have led to the need for more sophisticated approaches to addressing the safety requirements of the construction industry. Despite extensive research in other industry domains, the construction industry has been passive in exploring the impact of a color scheme; perception-related accidents have been effectively diminished by its implementation. The research demonstrated that the use of appropriate color schemes could improve the actions and psychology of workers on site, thereby increasing their perceptions of potentially dangerous situations. As a preliminary study, the objects selected by rigorous analysis on accident reports were workwear, safety net, gondola, scaffolding, and safety passage. The colors modified on site for temporary facilities were adopted from existing theoretical and empirical research that suggests the use of certain colors and their combinations to improve visibility and conspicuity while minimizing work fatigue. The color schemes were also tested and confirmed through two workshops with workers and managers currently involved in actual projects. The impacts of color schemes suggested in this paper are summarized as follows. First, the color schemes improve the conspicuity of facilities with other on site components, enabling workers to quickly discern and orient themselves in their work environment. Secondly, the color schemes have been selected to minimize the visual work fatigue and monotony that can potentially increase accidents. Copyright © 2011 Elsevier Ltd. All rights reserved.

  13. Factors influencing unsafe behaviors and accidents on construction sites: a review.

    Science.gov (United States)

    Khosravi, Yahya; Asilian-Mahabadi, Hassan; Hajizadeh, Ebrahim; Hassanzadeh-Rangi, Narmin; Bastani, Hamid; Behzadan, Amir H

    2014-01-01

    Construction is a hazardous occupation due to the unique nature of activities involved and the repetitiveness of several field behaviors. The aim of this methodological and theoretical review is to explore the empirical factors influencing unsafe behaviors and accidents on construction sites. In this work, results and findings from 56 related previous studies were investigated. These studies were categorized based on their design, type, methods of data collection, analytical methods, variables, and key findings. A qualitative content analysis procedure was used to extract variables, themes, and factors. In addition, all studies were reviewed to determine the quality rating and to evaluate the strength of provided evidence. The content analysis identified 8 main categories: (a) society, (b) organization, (c) project management, (d) supervision, (e) contractor, (f) site condition, (g) work group, and (h) individual characteristics. The review highlighted the importance of more distal factors, e.g., society and organization, and project management, that may contribute to reducing the likelihood of unsafe behaviors and accidents through the promotion of site condition and individual features (as proximal factors). Further research is necessary to provide a better understanding of the links between unsafe behavior theories and empirical findings, challenge theoretical assumptions, develop new applied theories, and make stronger recommendations.

  14. A new algorithm for construction of coarse-grained sites of large biomolecules.

    Science.gov (United States)

    Li, Min; Zhang, John Z H; Xia, Fei

    2016-04-05

    The development of coarse-grained (CG) models for large biomolecules remains a challenge in multiscale simulations, including a rigorous definition of CG representations for them. In this work, we proposed a new stepwise optimization imposed with the boundary-constraint (SOBC) algorithm to construct the CG sites of large biomolecules, based on the s cheme of essential dynamics CG. By means of SOBC, we can rigorously derive the CG representations of biomolecules with less computational cost. The SOBC is particularly efficient for the CG definition of large systems with thousands of residues. The resulted CG sites can be parameterized as a CG model using the normal mode analysis based fluctuation matching method. Through normal mode analysis, the obtained modes of CG model can accurately reflect the functionally related slow motions of biomolecules. The SOBC algorithm can be used for the construction of CG sites of large biomolecules such as F-actin and for the study of mechanical properties of biomaterials. © 2015 Wiley Periodicals, Inc.

  15. The impact of national cultural distance on the number of foreign web site visits by U.S. households

    OpenAIRE

    Beugelsdijk, S.; Slangen, A.

    2010-01-01

    We investigate how national cultural distance, defined as the extent to which the shared values and norms in one country differ from those in another, affect the number of Web site visits. Based on a sample of 2,654 U.S. households visiting Web sites in 38 countries over 25 different Web site categories, we find that cultural distance has a negative and significant effect on the number of taste-related foreign Web site visits. In the case of Web sites containing sexually explicit material, we...

  16. Exploring Language Choice and Identity Construction in "In-Between" Sites: Ethnic Media and Community Languages Schools in Australia

    Science.gov (United States)

    Rubino, Antonia; Cruickshank, Ken

    2016-01-01

    Australian research on immigrant languages has paid little attention to interactional approaches to language alternation as identity construction, and sites other than the family and the mainstream school. We argue for the need of studies that take into account a wider range of sites, in particular "community" sites, and adopt…

  17. Analysis of noise on construction sites of high-rise buildings.

    Science.gov (United States)

    Barkokébas, Béda; Vasconcelos, Bianca M; Lago, Eliane Maria G; Alcoforador, Aline Fabiana P

    2012-01-01

    In the civil construction industry sector, it has been observed that the increasing use of machines has made tasks noisier and consequently caused hearing loss and had other adverse effects on workers. The objective of this study was to identify and assess the physical risks of noise present in activities undertaken in a construction company in order to propose control measures which will contribute to the management of health and safety within the company's organization. The methodology applied was based on verifying the characteristics of exposure to noise on construction sites, from an observation of sources which generated noise and making measurements of sound pressure levels emitted by these sources. The data was then analyzed and compared with the recommended performance levels established in control measures. As a result, it was found that some machines and equipment used in civil construction often generate noise above the acceptable levels and as such, in these cases, various control measures have been proposed. It is believed that the use of management techniques is the most effective way to assess risk and to implement the preventive and corrective actions proposed, and allows for the analysis of sound pressure levels on an ongoing basis.

  18. Environmental assessment for the A-01 outfall constructed wetlands project at the Savannah River Site

    International Nuclear Information System (INIS)

    1998-10-01

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021)

  19. Proceedings of the CNRA Workshop on New Reactor Siting, Licensing and Construction Experience

    International Nuclear Information System (INIS)

    2011-01-01

    This report documents the proceedings from the 'Workshop on New Reactor Siting, Licensing and Construction Experience', held in Prague, Czech Republic on 15-17 September 2010. A total of 59 specialists from 16 countries and international organisations attended. The Meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the State Office for Nuclear Safety (SUJB) in Czech Republic. The objectives of the workshop were to review and discuss recent and past construction experience lessons learned including perspectives from regulatory authorities, as well as vendors, and licensee. The workshop addressed issues associated with project management resources including: a) overall human resources, expertise, experience and organisation available to the licensee, b) capability of each potential vendor (in-house knowledge and skills versus planned subcontracting and subcontractor management). The workshop also discussed the lessons learned in the regulation of site selection, evaluation and site preparation as well as the review of regulatory practices for the licensing of new reactors, including the regulatory body infrastructure, staffing and expertise needed. The workshop provided an excellent opportunity to communicate recent experience on these topics to a wider audience, including participants from OECD member countries as well as New Entrants from non-OECD member countries. The workshop allowed the WGRNR group to introduce and discuss the current programme of work and products under development in order to gain insights from workshop participants on each of the programme of work areas, and get feedback on additional focus areas. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to presentations of the licensing process for new reactors followed by different member countries. The second technical session was

  20. China: the construction of the Taishan number 1 EPR reactor reaches a major milestone with the setting of the vessel

    International Nuclear Information System (INIS)

    Anon.

    2012-01-01

    This article describes some characteristics of the reactor vessel which has recently been introduced in the building of the number 1 EPR reactor of Taishan in China; the construction of this EPR reactor is coordinated by EDF, CGNPC and Areva. It also briefly describes how this introduction has been performed, and evokes the fabrication quality issues and tests

  1. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    Scott, D.E.; Chazel, A.C.; Pechmann, J.H.K.; Estes, R.A.

    1993-06-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980's. The Savannah River Ecology Laboratory (SREL) has completed 14 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ''refuge ponds'' as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022)

  2. Connecting numbers to discrete quantification: a step in the child's construction of integer concepts.

    Science.gov (United States)

    Slusser, Emily; Ditta, Annie; Sarnecka, Barbara

    2013-10-01

    The present study asks when young children understand that number words quantify over sets of discrete individuals. For this study, 2- to 4-year-old children were asked to extend the number word five or six either to a cup containing discrete objects (e.g., blocks) or to a cup containing a continuous substance (e.g., water). In Experiment 1, only children who knew the exact meanings of the words one, two and three extended higher number words (five or six) to sets of discrete objects. In Experiment 2, children who only knew the exact meaning of one extended higher number words to discrete objects under the right conditions (i.e., when the problem was first presented with the number words one and two). These results show that children have some understanding that number words pertain to discrete quantification from very early on, but that this knowledge becomes more robust as children learn the exact, cardinal meanings of individual number words. Copyright © 2013 Elsevier B.V. All rights reserved.

  3. Standardized UXO Technology Demonstration Site, Blind Grid Scoring Record Number 842

    National Research Council Canada - National Science Library

    Karwatka, Michael; Fling, Rick; McClung, Christina; Banta, Matthew; Burch, William; McDonnell, Patrick

    2007-01-01

    ...) utilizing the APG Standardized UXO Technology Demonstration Site Blind Grid. This Scoring Record was coordinated by Michael Karwatka and the Standardized UXO Technology Demonstration Site Scoring Committee...

  4. Standardized UXO Technology Demonstration Site, Blind Grid Scoring Record Number 431

    National Research Council Canada - National Science Library

    Overbay, Larry; Robitaille, George

    2005-01-01

    ...) utilizing the YPG Standardized UXO Technology Demonstration Site Blind Grid. The scoring record was coordinated by Larry Overbay and by the Standardized UXO Technology Demonstration Site Scoring Committee...

  5. Standardized UXO Technology Demonstration Site Blind Grid Scoring Record Number 691

    National Research Council Canada - National Science Library

    Overbay, Jr., Larry; Watts, Kimberly; Fling, Rick; McClung, Christina; Banta, Matthew

    2006-01-01

    ...) utilizing the APG Standardized UXO Technology Demonstration Site blind grid. Scoring Records have been coordinated by Larry Overbay and the Standardized UXO Technology Demonstration Site Scoring Committee...

  6. Standardized UXO Technology Demonstration Site. Open Field Scoring Record Number 154

    National Research Council Canada - National Science Library

    Overbay, Larry

    2004-01-01

    ...) utilizing the APG Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbay and by the Standardized UXO Technology Demonstration Site Scoring Committee...

  7. Standardized UXO Technology Demonstration Site, Open Field Scoring Record Number 379

    National Research Council Canada - National Science Library

    Overbay, Larry; Robitaille, George

    2005-01-01

    ... (UXO) utilizing the APG Standardized UXO Technology Demonstration Site Open Field. Scoring Records have been coordinated by Larry Overbay and the Standardized UXO Technology Demonstration Site Scoring Committee...

  8. Standardized UXO Technology Demonstration Site Open Field Scoring Record Number 354

    National Research Council Canada - National Science Library

    Overbay, Larry, Jr; Archiable, Robert; McClung, Christina

    2005-01-01

    ...) utilizing the YPG Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbay and by the Standardized UXO Technology Demonstration Site Scoring Committee...

  9. Standardized UXO Technology Demonstration Site Open Field Scoring Recording Number 231 (Human Factors Applications, Inc.)

    National Research Council Canada - National Science Library

    Overbay, Larry; Robitaille, George

    2005-01-01

    ...) utilizing the APG Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbuy and by the Standardized UXO Technology Demonstration Site Scoring Committee...

  10. Standardized UXO Technology Demonstration Site, Open Field Scoring Record Number 426

    National Research Council Canada - National Science Library

    Overbay, Larry, Jr; Boutin, Matthew; Archiable, Robert; Fling, Rick; McClung, Christina; Robitaille, George

    2005-01-01

    ...) utilizing the YPG Standardized UXO Technology Demonstration Site Open Field. Scoring Records have been coordinated by Larry Overbay and the Standardized UXO Technology Demonstration Site Scoring Committee...

  11. Standardized UXO Technology Demonstration Site, Open Field Scoring Record Number 657

    National Research Council Canada - National Science Library

    Overbay, Larry; Robitaille, George

    2005-01-01

    ...) utilizing the APG Standardized UXO Technology Demonstration Site Open Field. Scoring Records have been coordinated by Larry Overbay and the Standardized UXO Technology Demonstration Site Scoring Committee...

  12. Standardized UXO Technology Demonstration Site Open Field Scoring Record Number 129

    National Research Council Canada - National Science Library

    Overbay, Larry

    2004-01-01

    ...) utilizing the APO Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbay and by the Standardized UXO Technology Demonstration Site Scoring Committee...

  13. Standardized UXO Technology Demonstration Site, Open Field Scoring Record Number 229

    National Research Council Canada - National Science Library

    Overbay, Larry, Jr; Boutin, Matthew; Fling, Rick; McClung, Christina; Robitaille, George

    2005-01-01

    ...) utilizing the APG Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbay and by the Standardized UXO Technology Demonstration Site Scoring Committee...

  14. Standardized UXO Technology Demonstration Site, Open Field Scoring Record Number 411

    National Research Council Canada - National Science Library

    Overbay, Larry; Robitaille, George

    2005-01-01

    ...) utilizing the APG Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbay and by the Standardized UXO Technology Demonstration Site Scoring Committee...

  15. Standardized UXO Technology Demonstration Site Open Field Scoring Record Number 673 (Naval Research Laboratories)

    National Research Council Canada - National Science Library

    Overbay, Larry; Robitaille, George

    2005-01-01

    ...) utilizing the APG standardized UXO Technology Demonstration Site Open Field. Scoring Records have been coordinate by Larry Overbay and the Standardized UXO Technology Demonstration Site Scoring Committee...

  16. Standardized UXO Technology Demonstration Site Open Field Scoring Record Number 169

    National Research Council Canada - National Science Library

    Overbay, Larry; Archiable, Robert; McClung, Christina; Robitaille, George

    2005-01-01

    ...) utilizing the YPG Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbay and by the Standardized UXO Technology Demonstration Site Scoring Committee...

  17. Standardized UXO Technology Demonstration Site Open Field Scoring Record Number 492 (Shaw Environmental, Inc.)

    National Research Council Canada - National Science Library

    Overbay, Larry; Robitaille, George

    2005-01-01

    ...) utilizing the APG Standardized UXO Technology Demonstration Site Open Field. Scoring Records have been coordinated by Larry Overbay and the Standardized UXO Technology Demonstration Site Scoring Committee...

  18. Standardized UXO Technology Demonstration Site Open Field Scoring Record Number 201

    National Research Council Canada - National Science Library

    Overbay, Larry, Jr; Fling, Rick; Robitaille, George

    2004-01-01

    ...) utilizing the APG Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbay and by the Standardized UXO Technology Demonstration Site Scoring Committee...

  19. Standardized UXO Technology Demonstration Site Open Field Scoring Record Number 668 (NAEVA Geophysics, Inc.)

    National Research Council Canada - National Science Library

    Overbay, Larry; Robitaille, George

    2005-01-01

    ...) utilizing they PG Standardized UXO Technology Demonstration Site Open Field. Scoring Records have been coordinate by Larry Overbay and the Standardized UXO Technology Demonstration Site Scoring Committee...

  20. Standardized UXO Technology Demonstration Site Open Field Scoring Record Number 165

    National Research Council Canada - National Science Library

    Overbay, Larry

    2004-01-01

    ...) utilizing the APO Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbay and by the Standardized UXO Technology Demonstration Site Scoring Committee...

  1. Standardized UXO Technology Demonstration Site, Open Field Scoring Record Number 638

    National Research Council Canada - National Science Library

    Overbay, Larry, Jr; Robitaille, George; Boutin, Matthew; Archiable, Robert; McClung, Christina

    2005-01-01

    ...) utilizing the YPG Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbay and the Standardized UXO Technology Demonstration Site Scoring Committee...

  2. On-site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures

    Directory of Open Access Journals (Sweden)

    Serdar Durdyev

    2011-09-01

    Full Text Available Productivity is key to the survival and growth of any organisation, industry or nation. Some factors constrain the achievement of the set project objectives in the New Zealand building and construction industry and are responsible for the reported steady decline of productivity and performance. This study aims to identify the key constraints to on-site labour productivity and improvement measures. Using the descriptive survey method, views of some project managers, contractors and subcontractors in New Zealand were canvassed via pilot interviews and questionnaire surveys at the qualitative and quantity data gathering stages, respectively. Multi-attribute technique was used to analyse the quantitative data. Results showed that the key external constraints to on-site labour productivity comprise, in order of decreasing impact, statutory compliance, unforeseen events and wider external dynamics. The internal constraints, which contribute 67 percent of the onsite productivity issues, comprise reworks, level of skill and experience of the workforce, adequacy of method of construction, buildability issues, and inadequate supervision and coordination. . The factors underlying each broad category of external and internal constraints are reported. The relative levels of impact of the identified constraints are expected to guide the project team in addressing the constraints in a cost-effective manner.

  3. Important considerations related to the construction of observation wells in radiation facilities sites: A review research

    International Nuclear Information System (INIS)

    El-Sayed, S. A.; Salem, W. M.; Atta, E. R.

    2012-01-01

    Observation wells in radiation facility sites are considered the main sources of the required subsurface geologic and hydrogeologic data. They are the most important means to detect the radioactive and/or chemical contaminants within the ground water. Also, they are used to observe the groundwater level fluctuations and perform the different aquifer tests to understand the hydraulic properties of aquifers and the behavior of contaminants transportation. This research reviews the necessary considerations and available techniques for constructing the observation wells properly. The review process depends on the international guidelines presented in the literature and the field experience. The proper well completion is essential for the well efficiency and longevity. Three main important topics are considered and discussed briefly in this review. They are the preliminary considerations, the drilling program and the well protection procedures. The preliminary considerations included are the collection of the available geologic and hydrogeologic data and information, selection of drilling method and the legal requirements. The drilling program comprises the site preparation, drilling processes, sampling, well logging, well design, casing components and materials, gravel pack and well development. The well protection procedures include well grout, concrete slab and others requirements. Observation wells should be constructed to a high standard and should be properly maintained and protected to ensure ongoing and reliable data collection

  4. Micropillars with a controlled number of site-controlled quantum dots

    Science.gov (United States)

    Kaganskiy, Arsenty; Gericke, Fabian; Heuser, Tobias; Heindel, Tobias; Porte, Xavier; Reitzenstein, Stephan

    2018-02-01

    We report on the realization of micropillars with site-controlled quantum dots (SCQDs) in the active layer. The SCQDs are grown via the buried stressor approach which allows for the positioned growth and device integration of a controllable number of QDs with high optical quality. This concept is very powerful as the number and the position of SCQDs in the cavity can be simultaneously controlled by the design of the buried-stressor. The fabricated micropillars exhibit a high degree of position control for the QDs above the buried stressor and Q-factors of up to 12 000 at an emission wavelength of around 930 nm. We experimentally analyze and numerically model the cavity Q-factor, the mode volume, the Purcell factor, and the photon-extraction efficiency as a function of the aperture diameter of the buried stressor. Exploiting these SCQD micropillars, we experimentally observe a Purcell enhancement in the single-QD regime with FP = 4.3 ± 0.3.

  5. Final audit report of remedial action construction at the UMTRA Project Site, Gunnison, Colorado. Revision 0

    International Nuclear Information System (INIS)

    1996-01-01

    The final audit report for remedial action at the Gunnison, Colorado Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the U.S. Department of Energy (DOE) and the Technical Assistance Contractor (TAC); and on-site construction reviews (OSCR) performed by the U.S. Nuclear Regulatory Commission (NRC). Two radiological surveillances and four radiological audits were performed at the Gunnison site. The surveillances were performed on 16 to 19 September 1992 and 28 June to 1 July 1993. The radiological audits were performed on 4 to 7 October 1993; 13 to 16 June 1994; 19 to 22 September 1994 and 10 to 12 July 1995. The surveillances and audits resulted in 79 observations. Thirty-four of the observations raised DOE concerns that were resolved on the site or through subsequent corrective action. All outstanding issues were closed on 12 July 1995. The radiological surveillances and audits are discussed in Section 2.0 of this report. Ten QA in-process surveillances were performed at the Gunnison UMTRA Project site. The surveillances were performed on 24 to 25 September 1992, 7 to 9 July 1993, 29 October 1993, 27 to 28 June 1994, 31 October to 1 November 1994, 19 to 20 June 1 995, 20 to 21 July 1995, 17 to 18 August 1995, 20 September 1995, and 11 to 13 October 1995. The surveillances resulted in 100 observations. Six observations contained recommendations that required responses from the Remedial Action Contractor (RAC). Ninety-five observations contained a recommendation that required no response. All outstanding issues were closed on 8 January 1996. The QA in-process surveillances are discussed in Section 3.0 of this report

  6. Economic and Environmental Evaluation of a Brick Delivery System Based on Multi-Trip Vehicle Loader Routing Problem for Small Construction Sites

    Directory of Open Access Journals (Sweden)

    Heungjo An

    2018-05-01

    Full Text Available While large construction sites have on-site loaders to handle heavy and large packages of bricks, small brick manufacturers employ a truck-mounted loader or sometimes deploy a loader truck to accompany normal brick delivery trucks to small construction sites lacking on-site loaders. It may be very challenging for small contractors to manage a sustainable delivery system that is both cost-effective and environmentally friendly. To address this issue, this paper proposes to solve a multi-trip vehicle loader routing problem by uniquely planning routes and schedules of several types of vehicles considering their synchronized operations at customer sites and multi trips. This paper also evaluates the sustainability of the developed model from both economic and environmental perspectives. Case studies based on small construction sites in the Middle East demonstrate applications of the proposed model to make the most economical plans for delivering bricks. Compared to the single-trip vehicle loader routing problem, the proposed model reduces, on average, 18.7% of the total delivery cost while increasing CO2 emission negligibly. The economic benefit is mainly achieved by reducing the required number of vehicles. Brick plant managers can use the proposed mathematical model to plan the most cost-effective delivery schedules sustainably while minimizing negative environmental effects.

  7. Effect of Substrate, Feeding Mode and Number of Stages on the Performance of Hybrid Constructed Wetland Systems

    Directory of Open Access Journals (Sweden)

    José Alberto Herrera-Melián

    2018-01-01

    Full Text Available A hybrid constructed wetland mesocosm has been used for the treatment of raw urban wastewater. The first stage was a mulch-based, subsurface, horizontal flow constructed wetland (HF. The HF achieved good removals of COD (61%; 54 g/m2·day and Total Suspended Solids (84%; 29 g/m2·day. The second stage was composed of vertical flow constructed wetlands (VF that were employed to study the effect of substrate (gravel vs. mulch, feeding mode (continuous vs. intermittent and the number of stages (1 vs. 2 on performance. High hydraulic and organic surface loadings (513–583 L/m2·day and 103–118 g/m2·day of COD were applied to the reactors. The mulch was more efficient than gravel for all the parameters analyzed. The continuous feeding allowed a 3 to 6-fold reduction of the surface area required.

  8. Standardized UXO Technology Demonstration Site Open Field Scoring Record Number 245

    National Research Council Canada - National Science Library

    Overbay, Larry

    2005-01-01

    ... (UXO) utilizing the YPG Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbay and by the Standardized UXO Technology Demonstration Site Scoring Committee...

  9. Standardized UXO Technology Demonstration Site Open Field Scoring Record Number 675

    National Research Council Canada - National Science Library

    Overbay, Larry; Robitaille, George

    2005-01-01

    ... (UXO) utilizing the APG Standardized UXO Technology Demonstration Site Open Field. The scoring record was coordinated by Larry Overbay and by the Standardized UXO Technology Demonstration Site Scoring Committee...

  10. A first look at roadheader construction and estimating techniques for site characterization at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Neil, D.M.; Taylor, D.L.

    1991-01-01

    The Yucca Mountain site characterization program will be based on mechanical excavation techniques for the mined repository construction and development. Tunnel Boring Machines (TBM's), Mobile Miners (MM), Raiseborers (RB), Blind Hole Shaft Boring Machines (BHSB), and Roadheaders (RH) have been selected as the mechanical excavation machines most suited to mine the densely welded and non-welded tuffs of the Topopah Springs and Calico Hills members. Heavy duty RH in the 70 to 100 ton class with 300 Kw cutter motors have been evaluated and formulas developed to predict machine performance based on the rock physical properties and the results of Linear Cutting Machine (LCM) tests done at the Colorado School of Mines (CSM) for Sandia National Labs. (SNL)

  11. Quality assurance of construction work on Dukovany nuclear power plant site

    International Nuclear Information System (INIS)

    Lachs, W.

    1983-01-01

    In order to eliminate the effects of the shrinking of concrete of the 150x70 m 2 bed slab 1 m thick, the slab was divided into 36 segments. The side walls were made of steel wire netting and the segments were concreted using the chessboard method. The second concreting was made only after the volume changes in the first concrete layer terminated. The density of the concrete of the shielding was controlled using routine methods as well as a radiometric densimeter which may be used on the building site, the technological procedure was checked by ultrasound, the surface of the concrete structures designed for epoxy coatings must be even and of uniform grain size. Volume moisture of the bed slab must be less than 4% and temperature lower than 10 degC. All deliveries, assembly and construction work must have a certificate of quality awarded after thorough tests and verification. (E.S.)

  12. A survey of the mechanical properties of concrete for structural purposes prepared on construction sites

    Directory of Open Access Journals (Sweden)

    R. R. J. RIBEIRO

    Full Text Available Abstract This paper aims to study the concrete dosage conditions for structural purposes in construction sitesl, and the impacts of non-compliance of structural concrete for structural safety, having as study case the city of Angicos / RN. Were analyzed the dynamic elasticity modulus, static elasticity modulus and the compressive strength of concrete samples. Was conducted to collect the survey data, a field research aiming to gather information about dosage of concrete used in the works, as well as the collection of cylindrical specimens of 150 mm diameter by 300 mm of height, prepared according to practice of those professionals. The study indicated a clear necessity to reflection on the subject, since there is no concern, or even, a lack of knowledge by the interviewed professionals regarding the care and procedures necessary for the production of concrete with satisfactory quality, once at least 50% of evaluated construction sites presented compressive strength lower than 20 MPa, minimal strength to structural concrete, as recommended by ABNT-NBR 6118:2014.

  13. Site-to-site genetic correlations and their implications on breeding zone size and optimum number of progeny test sites for Coastal Douglas-fir.

    Science.gov (United States)

    G.R. Johnson

    1997-01-01

    Type B genetic correlations were used to examine the relation among geographic differences between sites and their site-to-site genetic (Type B) correlations. Examination of six local breeding zones in Oregon indicated that breeding zones were, for the most part, not too large because few environmental variables were correlated with Type B genetic correlations. The...

  14. Robust Segmentation of Planar and Linear Features of Terrestrial Laser Scanner Point Clouds Acquired from Construction Sites

    Science.gov (United States)

    Maalek, Reza; Lichti, Derek D; Ruwanpura, Janaka Y

    2018-01-01

    Automated segmentation of planar and linear features of point clouds acquired from construction sites is essential for the automatic extraction of building construction elements such as columns, beams and slabs. However, many planar and linear segmentation methods use scene-dependent similarity thresholds that may not provide generalizable solutions for all environments. In addition, outliers exist in construction site point clouds due to data artefacts caused by moving objects, occlusions and dust. To address these concerns, a novel method for robust classification and segmentation of planar and linear features is proposed. First, coplanar and collinear points are classified through a robust principal components analysis procedure. The classified points are then grouped using a new robust clustering method, the robust complete linkage method. A robust method is also proposed to extract the points of flat-slab floors and/or ceilings independent of the aforementioned stages to improve computational efficiency. The applicability of the proposed method is evaluated in eight datasets acquired from a complex laboratory environment and two construction sites at the University of Calgary. The precision, recall, and accuracy of the segmentation at both construction sites were 96.8%, 97.7% and 95%, respectively. These results demonstrate the suitability of the proposed method for robust segmentation of planar and linear features of contaminated datasets, such as those collected from construction sites. PMID:29518062

  15. Design and construction of landslide preventive construction at Yamasubara hydroelectric power plant site. Yamasubata hatsudensho chiten ni okeru jisuberi taisaku koji no sekkei seko ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Takase, H; Ito, M; Sakata, M [The Kyushu Electric Power Co. Inc., Fukuoka (Japan)

    1993-07-30

    This paper reports the design and construction of landslide preventive construction at the site of the Yamasubara hydroelectric power plant (with a maximum output of 40,700 kW) and the result of slope stability verification after completion of the construction. The moderate slope on top of the primary slide has sands presumed to be colluvial deposit distributed with a depth of 10 m or more, where occurrence of a secondary slip was feared as triggered by the primary slide. The power plant protective constructions consisted of concrete walls to protect the entire power plant including buildings, and falling stone protective fences installed around the surge tanks. The temporary measures were so set that groundwater levels are lowered to a level that can assure the slide safety factor of 1.0 or more by means of drain boring using the down-the-hole hammer type. The permanent protective construction used rock anchors that are superior in constructability and economy. The stability of sliding slope faces was verified to confirm effects of the protective constructions. The verification included observations of groundwater level behavior, water well-up from drain holes, and movements in the slopes. The result showed that the protective constructions have give sufficient effects. Continued slope stability control is important. 16 figs., 7 tabs.

  16. Assessment of the living and workplace health and safety conditions of site-resident construction workers in Tehran, Iran.

    Science.gov (United States)

    Mohseni, Peyman Hossein; Farshad, Ali Asghar; Mirkazemi, Roksana; Orak, Rouhangiz Jamshidi

    2015-01-01

    The purpose of this study was to assess living and workplace safety conditions of construction workers in Tehran, Iran. This cross-sectional study was conducted among 410 construction sites in a municipal area of Tehran whose municipal building permits were issued in 2011. Data on ventilation, workplace safety and hygiene were collected by direct observation and interviews with site foremen. Noise levels were estimated from 10 sound-level-meter stations in the municipality area. Lack of ventilation in the workers' rooms was abundant. Bathrooms were unhygienic and minimum requirements such as lighting and ventilation did not exist in 80% of the cases. In nearly 50% of large construction sites, sewage and garbage disposal were inappropriate. Elevator safety was poor at all sites and no measures for fall prevention were present in over 88% of active construction sites. This study showed that the mean 24-h equivalent continuous sound level Leq was over 70 dB in 80% of the sites during weekdays. The results of this study revealed poor health and safety living and working conditions of construction workers in Tehran.

  17. Standardized UXO Technology Demonstration Site Blind Grid Scoring Record Number 312

    National Research Council Canada - National Science Library

    Overbay, Larry, Jr; Archiable, Robert; McClung, Christina; Robitaille, George

    2005-01-01

    ...) utilizing the YPG Standardized UXO Technology Demonstration Site Blind Grid. The scoring record was coordinated by Larry Overbay and by the Standardized UXO Technology Demonstration Scoring Committee...

  18. Standardized UXO Technology Demonstration Site Open Field Scoring Record Number 740

    National Research Council Canada - National Science Library

    Overbay, Jr., Larry; Fling, Rick; McClug, Christina; Watts, Kimberly; Banta, Matthew

    2006-01-01

    The objective in the Standardized UXO Technology Demonstration Site Program is to evaluate the detection and discrimination capabilities of a given technology under various field and soil conditions...

  19. Bats and wind turbines : pre-siting and pre-construction survey protocols

    Energy Technology Data Exchange (ETDEWEB)

    Lausen, C.; Baerwald, E.; Gruver, J.; Barclay, R. [Calgary Univ., AB (Canada)

    2008-05-15

    Studies have shown that a number of bats are killed by moving wind turbine blades at wind farms throughout North America. The studies have shown that over 80 per cent of the fatalities involve migratory bat species. Hoary bats, eastern red bats, and silver-haired bats dominate the fatalities during the fall migration period. Fatality rates vary among wind energy developments. Some data suggest that fatalities are higher on nights with lower wind speeds, and increased fatalities have been associated with taller wind turbines. This report outlined pre-construction survey requirements for preventing bat fatalities at wind power plants. A pre-construction survey was recommended to achieve a representative sampling of bat activity and determine the relative risk to bats. The study suggested that monitoring data from locations across the province should be pooled to provide a better understanding of the landscape-scale patterns of bat migration. Monitoring for bats should be conducted continuously due to the sporadic nature of peaks in bat activity, the influence of temperature, moon phase, and weather variables. Sampling techniques for acoustic detection, radar tracking, and mist-netting should be implemented to determine the abundance of susceptible species and the location of migration routes. All existing meteorological towers should be used as sampling stations with bat detectors installed at ground level and near the top of the tower. Additional detector stations should be distributed throughout the wind resource area. Specialized anabat microphones should be calibrated to record bat activity. Acoustic data should be presented as total bat passes and mean passes per night and matched with corresponding meteorological data. It was concluded that pre-construction monitoring data should be gathered and made available for collaborative and cumulative research efforts. 28 refs., 1 fig.

  20. Summary of experience from a large number of construction inspections; Wind power plant projects; Erfarenhetsaaterfoering fraan entreprenadbesiktningar

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Bertil; Holmberg, Rikard

    2010-08-15

    This report presents a summary of experience from a large number of construction inspections of wind power projects. The working method is based on the collection of construction experience in form of questionnaires. The questionnaires were supplemented by a number of in-depth interviews to understand more in detail what is perceived to be a problem and if there were suggestions for improvements. The results in this report is based on inspection protocols from 174 wind turbines, which corresponds to about one-third of the power plants built in the time period. In total the questionnaires included 4683 inspection remarks as well as about one hundred free text comments. 52 of the 174 inspected power stations were rejected, corresponding to 30%. It has not been possible to identify any over represented type of remark as a main cause of rejection, but the rejection is usually based on a total number of remarks that is too large. The average number of remarks for a power plant is 27. Most power stations have between 20 and 35 remarks. The most common remarks concern shortcomings in marking and documentation. These are easily adjusted, and may be regarded as less serious. There are, however, a number of remarks which are recurrent and quite serious, mainly regarding gearbox, education and lightning protection. Usually these are also easily adjusted, but the consequences if not corrected can be very large. The consequences may be either shortened life of expensive components, e.g. oil problems in gear boxes, or increased probability of serious accidents, e.g. maladjusted lightning protection. In the report, comparison between power stations with various construction period, size, supplier, geography and topography is also presented. The general conclusion is that the differences are small. The results of the evaluation of questionnaires correspond well with the result of the in-depth interviews with clients. The problem that clients agreed upon as the greatest is the lack

  1. An assessment of potential hydrologic and ecologic impacts of constructing mitigation wetlands, Rifle, Colorado, UMTRA project sites

    International Nuclear Information System (INIS)

    1995-04-01

    This-assessment examines the consequences and risks that could result from the proposed construction of mitigation wetlands at the New and Old Rifle Uranium Mill Tailings Remedial Action (UMTRA) Project sites near Rifle, Colorado. Remediation of surface contamination at those sites is now under way. Preexisting wetlands at or near the Old and New Rifle sites have been cleaned up, resulting in the loss of 0.7 and 10.5 wetland acres (ac) (0.28 and 4.2 hectares [ha]) respectively. Another 9.9 ac (4.0 ha) of wetlands are in the area of windblown contamination west of the New Rifle site. The US Army Corps of Engineers (USACE) has jurisdiction over the remediated wetlands. Before remedial action began, and before any wetlands were eliminated, the USACE issued a Section 404 Permit that included a mitigation plan for the wetlands to be lost. The mitigation plan calls for 34.2 ac (1 3.8 ha) of wetlands to be constructed at the south end and to the west of the New Rifle site. The mitigation wetlands would be constructed over and in the contaminated alluvial aquifer at the New Rifle site. As a result of the hydrologic characteristics of this aquifer, contaminated ground water would be expected to enter the environment through the proposed wetlands. A preliminary assessment was therefore required to assess any potential ecological risks associated with constructing the mitigation wetlands at the proposed location

  2. On-site wastewater treatment using subsurface flow constructed wetlands in Ireland.

    Science.gov (United States)

    Gill, Laurence W; O'Luanaigh, Niall; Johnston, Paul M

    2011-01-01

    The results from an Irish EPA-funded project on the effectiveness of using constructed wetlands for treating wastewater from single households is presented, which has contributed to the design guidelines included in the new EPA Code of Practice. Three subsurface flow gravel-filled wetlands were constructed on separate sites--one to provide secondary treatment and the other two to provide tertiary treatment stages for the domestic effluent. A comprehensive analysis over three years was then conducted to provide a robust characterization of the internal dynamics of the systems, particularly with respect to N and P removal as well as evaluating the temporal water balance across the different seasons. The removal of Total N was only 29% and 30% in the secondary and tertiary treatment wetlands, respectively; particularly disappointing for the tertiary treatment process, which was receiving nitrified effluent. Studies on the (15)N stable isotope confirmed that 35% of the ammonium from the septic tank was passing straight through the process without taking part in any biogeochemical processes. However, influent N in the wetlands was shown to be biologically assimilated into organic nitrogen and then released again as soluble ammonium--so-called nitrogen "spiraling." Removal of Total P in the wetlands averaged from 28% to 45% with higher P removals measured during summer periods, although the effluent concentrations were still found to be high (> 5 mg/l on average). The phosphorus in the plant material was also analysed revealing that the annual above-ground stem matter only accounted for 1.3% to 8.4% of the annual total P-load in the wetlands. Finally, the water balance analyses showed that the mean flow discharging from both the secondary and tertiary treatment wetlands was slightly greater than the mean flow to the reed bed over the trial period, with rainfall acting to increase flows by 13% and 5%, respectively, on average in winter while just about balancing

  3. Determining Safety Inspection Thresholds for Employee Incentives Programs on Construction Sites.

    Science.gov (United States)

    Sparer, Emily; Dennerlein, Jack

    2013-01-01

    The goal of this project was to evaluate approaches of determining the numerical value of a safety inspection score that would activate a reward in an employee safety incentive program. Safety inspections are a reflection of the physical working conditions at a construction site and provide a safety score that can be used in incentive programs to reward workers. Yet it is unclear what level of safety should be used when implementing this kind of program. This study explored five ways of grouping safety inspection data collected during 19 months at Harvard University-owned construction projects. Each approach grouped the data by one of the following: owner, general contractor, project, trade, or subcontractor. The median value for each grouping provided the threshold score. These five approaches were then applied to data from a completed project in order to calculate the frequency and distribution of rewards in a monthly safety incentive program. The application of each approach was evaluated qualitatively for consistency, competitiveness, attainability, and fairness. The owner-specific approach resulted in a threshold score of 96.3% and met all of the qualitative evaluation goals. It had the most competitive reward distribution (only 1/3 of the project duration) yet it was also attainable. By treating all workers equally and maintaining the same value throughout the project duration, this approach was fair and consistent. The owner-based approach for threshold determination can be used by owners or general contractors when creating leading indicator incentives programs and by researchers in future studies on incentive program effectiveness.

  4. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado: Appendix B to Attachment 3, Lithologic logs and monitor well construction information. Final report

    International Nuclear Information System (INIS)

    1995-09-01

    This volume contains lithology logs and monitor well construction information for: NC processing site; UC processing site; and Burro Canyon disposal site. This information pertains to the ground water hydrology investigations which is attachment 3 of this series of reports

  5. Site characterization progress report: Yucca Mountain, Nevada, April 1, 1991--September 30, 1991, Number 5

    International Nuclear Information System (INIS)

    1992-06-01

    The Site Characterization Progress Report of Yucca Mountain (PR) presents brief summaries of the status of site characterization activities and cites the technical reports and research products that provide more detailed information on the activities. The report provides highlights of work started during the reporting period, work in progress, and work completed and documented during the reporting period. In addition, the report is the vehicle for the discussion of changes to the DOE's site characterization program resulting from ongoing collection and evaluation of site information; the development of repository and waste-package designs; the results of performance assessments; and any changes that occur in response to external comments. Information covered includes geochemistry, hydrology, geology, climate, and radiation dose estimate calculations

  6. Occupational health and safety issues in the informal economic segment of Pakistan: a survey of construction sites.

    Science.gov (United States)

    Ahmed, Ishfaq; Shaukat, Muhammad Zeeshan; Usman, Ahmad; Nawaz, Muhammad Musarrat; Nazir, Mian Sajid

    2018-06-01

    This research covers the current status of occupational health and safety (OHS)-related practices in the informal construction segment of Pakistan. Data were collected, through interviews, from 316 construction sites employing 3577 workers. The results of the study reveal that both employers and workers lack knowledge of OHS laws/standards and no practices of this nature are enacted at these construction sites. Alarmingly, work-related accidents, whenever they happen, are not given due attention and there is no formal injury-report system. The informal construction industry employs a huge portion of the informal workforce, and lack of OHS happens at tremendous human cost. These research findings may thus play their role in strengthening the case for reforms in the sector. This study, if properly utilized, may also enable employers of the sector by increasing their knowledge about OHS practices and, as a result, trying to offer safer environments for their workers.

  7. Erodibility of waste (Loess) soils from construction sites under water and wind erosional forces.

    Science.gov (United States)

    Tanner, Smadar; Katra, Itzhak; Argaman, Eli; Ben-Hur, Meni

    2018-03-01

    Excess soils from construction sites (waste soils) become a problem when exposed to soil erosion by water or wind. Understanding waste soil erodibility can contribute to its proper reuse for various surface applications. The general objective of the study was to provide a better understanding of the effects of soil properties on erodibility of waste soils excavated from various depths in a semiarid region under rainfall and wind erosive forces. Soil samples excavated from the topsoil (0-0.3m) and subsoil layers (0.3-0.9 and >1m depths) were subjected to simulated rainfall and wind. Under rainfall erosive forces, the subsoils were more erodible than the topsoil, in contrast to the results obtained under wind erosive forces. Exchangeable sodium percentage was the main factor controlling soil erodibility (K i ) under rainfall, and a significant logarithmic regression line was found between these two parameters. In addition, a significant, linear regression was found between K i and slaking values for the studied soil samples, suggesting that the former can be predicted from the latter. Soil erodibility under wind erosion force was controlled mainly by the dry aggregate characteristics (mean weight diameter and aggregate density): their higher values in the subsoil layers resulted in lower soil erodibility compared to the topsoil. Copyright © 2017 Elsevier B.V. All rights reserved.

  8. Design of NPP of new generation being constructed at Novovoronezh NPP site

    International Nuclear Information System (INIS)

    Afrov, A.; Berkovich, V.; Generalov, V.; Dragunov, Yu.; Krushelnitskij, V.

    2000-01-01

    The design of a new-generation nuclear power plant with advanced WWER-1000 units, currently under construction at Novovoronezh, is dealt with in considerable detail. Information is given on the general layout of the power plant, and the monoblock comprising the four-loop reactor plant with double containment, the turbine hall with two turbine-driven feedwater pumps and safety and auxiliary systems is described. In a separate building at the power plant site, a new fuel storage facility is located designed for extreme external effects. The operations involved in fuel handling, in both the storage facility and the reactor department, are mentioned. The management of various types of radioactive waste is highlighted. The basic principles of the engineering solutions pertaining to the plant's electrical part are outlined. The concept of the instrumentation and control system is explained. Information is also given on the double containment system. A considerable part of the presentation is devoted to the philosophy and concept of the power plant safety, to the results of safety evaluation and to the research carried out in this respect. The paper is concluded with a discussion of the experiments and analyses performed with the aim to justify the design solutions as regards the passive heat removal system. (A.K.)

  9. Sustainability assessment, rating systems and historical buildings Case study: Rehabilitated construction in a university site

    Directory of Open Access Journals (Sweden)

    Sadrykia Somayeh

    2016-01-01

    Full Text Available This paper explores the relationship between the indicators and different factors that “rating systems for green projects” concentrates on, and principles and factors considered in the rehabilitation of historical buildings. In recent years, different methods and systems concerned and improved for assessing environmental sustainability. LEED (Leadership in Energy and Environmental Design and BREEAM (Building Research Establishment (BRE Environmental Assessment Method are two most commonly used rating systems, established in U.S and UK. These systems comprise some categories and different factors to achieve environmentally responsible design. Firstly, this study focuses on the list of rating systems indicators and criteria. Secondly this paper investigates a historical rehabilitated building in the site of Tabriz Art University, as a case study and has tried to compile its green design elements. Finally, this work intends to compare mentioned elements with indicators and factors of building rating systems. Findings of the study revealed that “Materials and Resources”, “indoor environmental quality” and also “Sustainable Sites” ,the most significant indicator of rating systems, had major and important role in the rehabilitation of the building. Beyond this materials’ life cycle was considerable in construction.

  10. Effect of corrosive marine atmosphere on construction materials in Tanzania: Exposure sites and preliminary results

    International Nuclear Information System (INIS)

    Mmari, A.G.; Uiso, C.B.S.; Makundi, I.N.; Potgieter-Vermaak, S.S.; Potgieter, J.H.; Van Grieken, R.

    2007-01-01

    Air pollution studies in Africa are limited and the influence of ambient air quality on buildings and constructions have not been investigated in the larger part of Sub-Saharan Africa. The increasing burden of emission from industry, traffic and coal power plants on ambient air pollution in Sub-Saharan Africa necessitated reviewing previous and current studies. In South Africa a 20-year exposure program, focusing on the effect of ambient exposure on various metals and alloys, showed that the amount of rainfall, relative humidity, atmospheric pollution, wind speed, solar radiation and structural design are some of the factors controlling atmospheric corrosion. Tanzania, being among the Sub-Saharan African countries and partly bordered by Indian ocean, the main source of marine atmosphere, experiences corrosive degradation on metal roofing and cementitious materials. This paper describes the exposure site set-up and will report on some preliminary results of air quality and its relation with the meteorological conditions, as well as surface changes observed, for the year one of exposure. These will thereafter be compared to the completed European and Asian studies, as reported by CLRTAP and RAPIDC respectively. (author)

  11. Nevada test site underground storage tank number 12-13-1: Nevada division of emergency management case number H931130E corrective action unit 450. Closure report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    The project site was identified as an abandoned Underground Storage Tank (UST) to be closed under the Department of Energy/Nevada Operations Office (DOE/NV) Environmental Restoration Division (ERD) Program during Fiscal Year 1993. The United States Environmental Protection Agency (EPA) requires that before permanent closure is completed an assessment of the site must take place. The Nevada Division of Environmental Protection (NDEP) requires assessment and corrective actions for a petroleum substance in the soil which exceeds 100 milligrams per kilogram (mg/kg). Subsequent to the tank removal, a hydrocarbon release was identified at the site. The release was reported to the NDEP by DOE/NV on November 30, 1993. Nevada Division of Environmental Management (NDEM) Case Number H931130E was assigned. This final closure report documents the assessment and corrective actions taken for the hydrocarbon release identified at the site. The Notification of Closure, EPA Form 7530-1 dated March 22, 1994, is provided in Appendix A. A 45-day report documenting the notification for a hydrocarbon release was submitted to NDEP on April 6, 1994.

  12. Berlin Brandenburg International (BER: planning and implementation of a concrete supply chain for the airport construction site

    Directory of Open Access Journals (Sweden)

    Guido Riedel

    2012-12-01

    Full Text Available Background: With the decision to extend the airport Berlin-Schönefeld to the new airport Berlin Brandenburg International (BER in 2006, a construction of superlatives has emerged. One of the biggest challenges was the supply of around 2.5 million cubic meters of high quality concrete that had to be produced for the construction of the airport. Due to the scale of this enterprise as well as its environment, the logistic solution of raw material supply has to be found.       Method: The planning of the concrete supply chain for the airport construction site BER had to be carried out with two major goals: the stability of the supply chain to assure that the demands of the construction site are met and delays are prevented, as well as assurance of the high quality standards of the concrete production and to avoid an alkali silica reaction and the resulting unavoidable disaggregation of the concrete. External effects, such as the carbon dioxide emission and the effect of the supply chain on adjoining residents were key factors that had to be integrated in a holistic supply chain concept.  The principle underlying method is an analysis of limiting conditions for two approaches: a centralized supply chain with on-site concrete factory and upstream transport of raw materials versus a decentralized supply chain with off-site factories and downstream transport of ready-mixed concrete. Results: The analysis of constraints and the effects on key requirements of the concrete supply chain for the BER airport construction site lead to the installation of the most modern concrete plant in Europe. The benefits of a centralized supply chain are significant. On one hand, the high quality standards can be met with the on-site mixture of the concrete and centralized quality assurance, on the other hand, the majority of the supply traffic for the construction site was moved from the road to train-bound logistics, meeting the emission requirements of the

  13. Application of a Coupled Eulerian-Lagrangian Technique on Constructability Problems of Site on Very Soft Soil

    Directory of Open Access Journals (Sweden)

    Junyoung Ko

    2017-10-01

    Full Text Available This paper presents the application of the Coupled Eulerian–Lagrangian (CEL technique on the constructability problems of site on very soft soil. The main objective of this study was to investigate the constructability and application of two ground improvement methods, such as the forced replacement method and the deep mixing method. The comparison between the results of CEL analyses and field investigations was performed to verify the CEL modelling. The behavior of very soft soil and constructability with methods can be appropriately investigated using the CEL technique, which would be useful tools for comprehensive reviews in preliminary design.

  14. Prevalence and correlates of nicotine dependence among construction site workers: A cross-sectional study in Delhi

    Directory of Open Access Journals (Sweden)

    Mamta Parashar

    2016-01-01

    Full Text Available Introduction: Workers represent half the world′s population and are major contributors to economic and social development. Tobacco consumption in construction site workers has been considered a big challenge. Objectives: (1 To assess the prevalence of nicotine dependence among tobacco users. (2 To study the correlates of nicotine dependence among the construction site workers. Methodology: A cross sectional study was conducted using a predesigned and pretested structured proforma. The study was conducted among all construction site workers aged 18yrs and above in campus of Hamdard Institute of Medical Sciences and Research and associated HAH centenary hospital, New Delhi.Karl Fagerstrom Nicotine Dependence Questionnaire was used to assess dependence on nicotine. Results: The mean age of construction site workers was 32.04±11.6 years. Among the workers, majority (91% were tobacco user. Among the users, 60% found it difficult to refrain from smoking/chewing in places where use of tobacco is not allowed (e.g. hospitals, government offices, cinemas, Libraries etc. 55% of the users smoked or chewed tobacco during the first hours after waking than during the rest of the day. On multivariate analysis, the factors which were found to be significantly associated with nicotine dependence were lower income group (OR 2.57, CI:1.66-3.99, smokeless tobacco use (OR 2.36,CI:1.30-4.27 and lower education (OR = 2.86 (95% CI 1.97-4.16 for illiterate. Discussion: The prevalence of tobacco use (91% among construction workers is very high compared to that in the general population. Recognition of construction sites as work places and proper implementation of law is needed.

  15. The importance of cleanliness in a proper construction site management in malaysia: a contractor’s perspective

    Science.gov (United States)

    Shazwan, M. A.; Quintin, J. V.; Osman, N. A.; Suhaida, S. K.; Ma'arof, M. I. N.

    2017-11-01

    Construction site’s cleanliness and tidiness is one of top main concerns of construction site management. A good site management with adequate planning in regards to housekeeping will ensure safety to both the site’s working personnel and the neighbouring environment. This is especially of priority today due to the rapid growth of construction projects in Malaysia. Nevertheless, to date, statistics had shown that housekeeping related accidents happened repeatedly despite the awareness on site’s cleanliness and tidiness. The objective of this study was to explore constructor’s perspective on site cleanliness and tidiness. A set of questionnaire was distributed to thirty-four (34) Grade 7 CIDB contractors’ firms in Petaling Jaya. Petaling Jaya was chosen since this area are developed area covered with residential area and cleaning management an importance issues. The goals of the survey study were to identify the following items from the perception of the contractors: (i) the hierarchy of importance of several purposes in ensuring construction site’s cleanliness and tidiness, and (ii) the risk factors that influence a construction site’s level of cleanliness and tidiness. It was found that from the contractor’s perspective, ensuring a site cleanliness and tidiness is of importance mainly due to the need in protecting the environment, whilst, the least in cost saving. In addition, poor personnel’s working attitude was found to be the main risk factor that will influences a construction site’s level of cleanliness and tidiness. Conclusively, construction site’s cleanliness and tidiness is highly vital. Even so, for nationwide awareness on the topic matter will requires full cooperation from all related parties.

  16. Consolidated Quarterly Report: Number of potential release sites subject to corrective action

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R.; Cochran, John R.

    2017-04-01

    This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent. The 12 sites in the corrective action process are listed in Table I-1.

  17. A GIS analysis of suitability for construction aggregate recycling sites using regional transportation network and population density features

    Science.gov (United States)

    Robinson, G.R.; Kapo, K.E.

    2004-01-01

    Aggregate is used in road and building construction to provide bulk, strength, support, and wear resistance. Reclaimed asphalt pavement (RAP) and reclaimed Portland cement concrete (RPCC) are abundant and available sources of recycled aggregate. In this paper, current aggregate production operations in Virginia, Maryland, and the District of Columbia are used to develop spatial association models for the recycled aggregate industry with regional transportation network and population density features. The cost of construction aggregate to the end user is strongly influenced by the cost of transporting processed aggregate from the production site to the construction site. More than 60% of operations recycling aggregate in the mid-Atlantic study area are located within 4.8 km (3 miles) of an interstate highway. Transportation corridors provide both sites of likely road construction where aggregate is used and an efficient means to move both materials and on-site processing equipment back and forth from various work sites to the recycling operations. Urban and developing areas provide a high market demand for aggregate and a ready source of construction debris that may be processed into recycled aggregate. Most aggregate recycling operators in the study area are sited in counties with population densities exceeding 77 people/km2 (200 people/mile 2). No aggregate recycling operations are sited in counties with less than 19 people/km2 (50 people/mile2), reflecting the lack of sufficient long-term sources of construction debris to be used as an aggregate source, as well as the lack of a sufficient market demand for aggregate in most rural areas to locate a recycling operation there or justify the required investment in the equipment to process and produce recycled aggregate. Weights of evidence analyses (WofE), measuring correlation on an area-normalized basis, and weighted logistic regression (WLR), are used to model the distribution of RAP and RPCC operations relative

  18. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  19. On the Use of Educational Numbers: Comparative Constructions of Hierarchies by Means of Large-Scale Assessments

    Directory of Open Access Journals (Sweden)

    Daniel Pettersson

    2016-01-01

    later the growing importance of transnational agencies and international, regional and national assessments. How to reference this article Pettersson, D., Popkewitz, T. S., & Lindblad, S. (2016. On the Use of Educational Numbers: Comparative Constructions of Hierarchies by Means of Large-Scale Assessments. Espacio, Tiempo y Educación, 3(1, 177-202. doi: http://dx.doi.org/10.14516/ete.2016.003.001.10

  20. Regulatory principles, criteria and guidelines for site selection, design, construction and operation of uranium tailings retention systems

    International Nuclear Information System (INIS)

    Coady, J.R.; Henry, L.C.

    1978-01-01

    Principles, criteria and guidelines developed by the Atomic Energy Control Board for the management of uranium mill tailings are discussed. The application of these concepts is considered in relation to site selection, design and construction, operation and decommissioning of tailings retention facilities

  1. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO

    Science.gov (United States)

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  2. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO - (Presentation)

    Science.gov (United States)

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  3. Systems Analysis, Scenario Construction and Consequence Analysis Definition for SITE-94

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, N A; Robinson, P [Intera Information Technologies Ltd (United Kingdom); Andersson, Johan; Wingefors, S [Swedish Nuclear Power Inspectorate, Stockholm (Sweden); Skagius, K; Wiborgh, M [Kemakta Konsult AB, Stockholm (Sweden); Wene, C O [Chalmers Inst. of Technology, Goeteborg (Sweden)

    1995-06-01

    SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This report uses scenario definition work as a vehicle to introduce the systems approach to performance assessment which has been developed and tested in SITE-94 and which constitutes one of the main advances made during the project. The results of the application of the methodology are presented separately, in the SITE-94 Summary Report. 40 refs, 21 figs, 12 tabs.

  4. Systems Analysis, Scenario Construction and Consequence Analysis Definition for SITE-94

    International Nuclear Information System (INIS)

    Chapman, N.A.; Robinson, P.; Andersson, Johan; Wingefors, S.; Skagius, K.; Wiborgh, M.; Wene, C.O.

    1995-06-01

    SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This report uses scenario definition work as a vehicle to introduce the systems approach to performance assessment which has been developed and tested in SITE-94 and which constitutes one of the main advances made during the project. The results of the application of the methodology are presented separately, in the SITE-94 Summary Report. 40 refs, 21 figs, 12 tabs

  5. Proposal for the award of a contract for the construction of an on-site hostel at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the construction of an on-site hostel at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the consortium BATIFLEX (GB) - BATINEG (CH), the lowest bidder, for the construction of an on-site hostel at CERN for a total amount of 5 290 000 Swiss francs, not subject to revision. However, for the reasons explained in this document, the Management wishes to request the Finance Committee to give consideration to the approval of a variant to the original specification to allow use to be made of part of an existing building for the reasons detailed in this document, at an additional cost of 350 000 Swiss francs, not subject to revision, bringing the total construction cost to 5 640 000 Swiss francs.

  6. Construction of Knowledge about Fractional Number A Construção do Conhecimento sobre Número Fracionário

    Directory of Open Access Journals (Sweden)

    Nilza Eigenheer Bertoni

    2008-12-01

    Full Text Available Studies, experimentation, and reflections over the course of twenty years have led our investigations in the direction of students’ construction of the concepts of fraction and fractional number. Distinct trends can be identified in our investigations over the years, each resulting from and reviewed following observations of students’ thinking and reactions as well as the depth and reach of the knowledge constructed. In the first of these phases, we used manipulative material; in the second, reflexive abstractions regarding divided geometric figures; in the third, objects that showed themselves divided in the real world, which led us to situations involving these objects and their associated fractional numbers. This revealed to us an interface with the ideas of Vergnaud regarding the formation of concepts, presented in the Theory of Conceptual Fields. We began to investigate and experiment with the development of a proposal for learning fractional numbers according to the elements of this conception, which includes initial situations, schemes of the students in action, and representations of the concept. In this context, we present the trajectory of our work, a re-elaboration of the proposal in the final phase, and our findings. The proposal we developed centers on the learning of fractions in the construction of a number, making explicit its aim and what it quantifies, as well as its relations with natural numbers. Key-words: Fraction as number. Vergnaud – Formation of Concepts. Counting, Division, Measures prioritized in relation to Divided Geometric Figures.Estudos, experimentações e reflexões ao longo de vinte anos conduziram nossas investigações na direção da construção dos conceitos de fração e de número fracionário pelos alunos. Nesses anos, distintas tendências ocorreram em nossas investigações, cada uma decorrente de e revista após observações do pensar e agir do aluno, bem como da profundidade e alcance do

  7. An innovative method for offshore wind farm site selection based on the interval number with probability distribution

    Science.gov (United States)

    Wu, Yunna; Chen, Kaifeng; Xu, Hu; Xu, Chuanbo; Zhang, Haobo; Yang, Meng

    2017-12-01

    There is insufficient research relating to offshore wind farm site selection in China. The current methods for site selection have some defects. First, information loss is caused by two aspects: the implicit assumption that the probability distribution on the interval number is uniform; and ignoring the value of decision makers' (DMs') common opinion on the criteria information evaluation. Secondly, the difference in DMs' utility function has failed to receive attention. An innovative method is proposed in this article to solve these drawbacks. First, a new form of interval number and its weighted operator are proposed to reflect the uncertainty and reduce information loss. Secondly, a new stochastic dominance degree is proposed to quantify the interval number with a probability distribution. Thirdly, a two-stage method integrating the weighted operator with stochastic dominance degree is proposed to evaluate the alternatives. Finally, a case from China proves the effectiveness of this method.

  8. Site characterization progress report: Yucca Mountain, Nevada, April 1, 1992--September 30, 1992, Number 7

    International Nuclear Information System (INIS)

    1992-12-01

    In accordance with section 113(b)(3) of the Nuclear Waste Policy Act of 1982, as amended (NWPA), the Department has prepared the seventh in a series of reports on the progress of site characterization at the Yucca Mountain candidate site. The Civilian Radioactive Waste Management Program made significant progress during the reporting period at the Yucca Mountain Site Characterization Project. Several important advances were made in the surface-based testing program including: initiation of borehole drilling utilizing the new, state-of-the-art LM-300 drill rig which employs dry drilling and coring techniques; neutron access borehole drilling to evaluate infiltration processes; excavations to aid geologic mapping; and trenching in Midway Valley to study Quaternary faulting. A Floodplain Assessment and Statement of Findings was published in the Federal Register which concluded there would be no significant impact nor cumulative impacts on floodplains resulting from Exploratory Studies Facility activities. The National Academy of Sciences' National Research Council released its report entitled ''Ground Water at Yucca Mountain: How High Can It Rise?'' which concluded that none of the evidence cited as proof of groundwater upwelling in and around Yucca Mountain could be reasonably attributed to that process and that significant water table excursions to the repository design level are not shown by the geologic record. The June 29, 1992, earthquake near Yucca Mountain provided scientists with a wealth of information relevant to understanding the neotectonics of the area and the geometry of faults at depth. Early findings suggest that accelerations recorded were well within proposed design limits for the surface waste handling facilities

  9. Site characterization progress report: Yucca Mountain, Nevada, April 1, 1992--September 30, 1992, Number 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-01

    In accordance with section 113(b)(3) of the Nuclear Waste Policy Act of 1982, as amended (NWPA), the Department has prepared the seventh in a series of reports on the progress of site characterization at the Yucca Mountain candidate site. The Civilian Radioactive Waste Management Program made significant progress during the reporting period at the Yucca Mountain Site Characterization Project. Several important advances were made in the surface-based testing program including: initiation of borehole drilling utilizing the new, state-of-the-art LM-300 drill rig which employs dry drilling and coring techniques; neutron access borehole drilling to evaluate infiltration processes; excavations to aid geologic mapping; and trenching in Midway Valley to study Quaternary faulting. A Floodplain Assessment and Statement of Findings was published in the Federal Register which concluded there would be no significant impact nor cumulative impacts on floodplains resulting from Exploratory Studies Facility activities. The National Academy of Sciences` National Research Council released its report entitled ``Ground Water at Yucca Mountain: How High Can It Rise?`` which concluded that none of the evidence cited as proof of groundwater upwelling in and around Yucca Mountain could be reasonably attributed to that process and that significant water table excursions to the repository design level are not shown by the geologic record. The June 29, 1992, earthquake near Yucca Mountain provided scientists with a wealth of information relevant to understanding the neotectonics of the area and the geometry of faults at depth. Early findings suggest that accelerations recorded were well within proposed design limits for the surface waste handling facilities.

  10. Chronic dihydroergotoxine treatment affects the number of dopamine recognition sites in rat striatum

    Energy Technology Data Exchange (ETDEWEB)

    Battaini, F.; Govoni, S.; Rius, R.A.; Spano, P.F.; Trabucchi, M.

    1984-06-01

    Ergot derivatives have been proposed to have ameliorative effects in various pathological conditions where dopaminergic transmission is believed to be impaired, namely Parkinson's disease, amenorrhea-galactorrhea syndrome, and in the treatment of behavioural disturbances of the elderly. To get more insight into a possible involvement of a direct action of ergot derivatives on dopamine receptors we studied the effect of acute and chronic dihydroergotoxine (DHT) treatment on 3H-Spiroperidol and 3H-N-Propylnorapomorphine (3H-NPA) binding to rat striatal membrane preparations. The results are in favor of an interaction of ergot derivatives with dopamine recognition sites both after acute and chronic treatment.

  11. Corrective Action Investigation Plan for the CNTA Subsurface Sites (CAU Number 443), Revision 1; FINAL

    International Nuclear Information System (INIS)

    1999-01-01

    This Corrective Action Investigation Plan (CAIP) describes the U.S. Department of Energy's (DOE's) planned environmental investigation of the subsurface Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) No. 443. The CNTA is located in Hot Creek Valley in Nye County, Nevada, adjacent to U.S. Highway 6, about 48 kilometers (km) (30 miles[mi]) north of Warm Springs, Nevada. The CNTA was the site of Project Faultless, a nuclear device detonated in the subsurface by the U.S. Atomic Energy Commission (AEC) in January 1968. The purposes of this test were to gauge the seismic effects of a relatively large, high-yield detonation completed in Hot Creek Valley (outside the Nevada Test Site) and to determine the suitability of the site for future large detonations. The yield of the Faultless test was between 200 kilotons and 1 megaton. Two similar tests were planned for the CNTA, but neither of them was completed. Based on the general definition of a corrective action investigation (CAI) from Section IV.14 of the Federal Facility Agreement and Consent Order (FFACO), the purpose of the CAI is ''to gather data sufficient to characterize the nature, extent, and rate of migration or potential rate of migration from releases or discharges of pollutants or contaminants and/or potential releases or discharges from corrective action units identified at the facilities''. For CNTA CAU 443 the concepts developed for the Underground Test Area (UGTA) CAUs will be applied on a limited scale. For the UGTA CAUs, ''the objective of the CAI process is to define boundaries around each UGTA CAU that establish areas that contain water that may be unsafe for domestic and municipal use,'' as stated in Appendix VI of the FFACO (1996). Based on this strategy the CAI for CAU 443 will start with modeling using existing data. New data collection activities are generally contingent upon the results of the modeling and may or may not be part of the CAI. Specific objectives of the CAI ar e as

  12. Chronic dihydroergotoxine treatment affects the number of dopamine recognition sites in rat striatum

    Energy Technology Data Exchange (ETDEWEB)

    Battaini, F; Govoni, S; Rius, R A; Spano, P F; Trabucchi, M

    1984-06-01

    Ergot derivatives have been proposed to have ameliorative effects in various pathological conditions where dopaminergic transmission is believed to be impaired, namely Parkinson's disease, amenorrhea-galactorrhea syndrome, and in the treatment of behavioural disturbances of the elderly. To get more insight into a possible involvement of a direct action of ergot derivatives on dopamine receptors we studied the effect of acute and chronic dihydroergotoxine (DHT) treatment on 3H-Spiroperidol and 3H-N-Propylnorapomorphine (3H-NPA) binding to rat striatal membrane preparations. The results are in favor of an interaction of ergot derivatives with dopamine recognition sites both after acute and chronic treatment.

  13. Characterization report for Area 23, Building 650 Leachfield, Corrective Action Unit Number 94, Nevada Test Site. Revision 1

    International Nuclear Information System (INIS)

    1998-01-01

    Corrective Action Unit (CAU) Number 94, Building 650 Leachfield, is an historic laboratory disposal unit located in Area 23 at the Nevada Test Site (NTS) in Nye County, Nevada. The objectives of this project were twofold: characterize subsurface conditions at the CAU with respect to the on-site disposal unit, and provide sufficient information to develop a closure strategy for the leachfield. To this end, subsurface sampling was conducted in the vicinity of the piping above the distribution box, under and around the distribution box, and within the leachfield

  14. Characterization report for Area 23, Building 650 Leachfield, Corrective Action Unit Number 94, Nevada Test Site. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-27

    Corrective Action Unit (CAU) Number 94, Building 650 Leachfield, is an historic laboratory disposal unit located in Area 23 at the Nevada Test Site (NTS) in Nye County, Nevada. The objectives of this project were twofold: characterize subsurface conditions at the CAU with respect to the on-site disposal unit, and provide sufficient information to develop a closure strategy for the leachfield. To this end, subsurface sampling was conducted in the vicinity of the piping above the distribution box, under and around the distribution box, and within the leachfield.

  15. Regulation of Coordination Number over Single Co Sites: Triggering the Efficient Electroreduction of CO2.

    Science.gov (United States)

    Wang, Xiaoqian; Chen, Zhao; Zhao, Xuyan; Yao, Tao; Chen, Wenxing; You, Rui; Zhao, Changming; Wu, Geng; Wang, Jing; Huang, Weixin; Yang, Jinlong; Hong, Xun; Wei, Shiqiang; Wu, Yuen; Li, Yadong

    2018-02-12

    The design of active, selective, and stable CO 2 reduction electrocatalysts is still challenging. A series of atomically dispersed Co catalysts with different nitrogen coordination numbers were prepared and their CO 2 electroreduction catalytic performance was explored. The best catalyst, atomically dispersed Co with two-coordinate nitrogen atoms, achieves both high selectivity and superior activity with 94 % CO formation Faradaic efficiency and a current density of 18.1 mA cm -2 at an overpotential of 520 mV. The CO formation turnover frequency reaches a record value of 18 200 h -1 , surpassing most reported metal-based catalysts under comparable conditions. Our experimental and theoretical results demonstrate that lower a coordination number facilitates activation of CO 2 to the CO 2 .- intermediate and hence enhances CO 2 electroreduction activity. © 2018 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  16. Real-time safety risk assessment based on a real-time location system for hydropower construction sites.

    Science.gov (United States)

    Jiang, Hanchen; Lin, Peng; Fan, Qixiang; Qiang, Maoshan

    2014-01-01

    The concern for workers' safety in construction industry is reflected in many studies focusing on static safety risk identification and assessment. However, studies on real-time safety risk assessment aimed at reducing uncertainty and supporting quick response are rare. A method for real-time safety risk assessment (RTSRA) to implement a dynamic evaluation of worker safety states on construction site has been proposed in this paper. The method provides construction managers who are in charge of safety with more abundant information to reduce the uncertainty of the site. A quantitative calculation formula, integrating the influence of static and dynamic hazards and that of safety supervisors, is established to link the safety risk of workers with the locations of on-site assets. By employing the hidden Markov model (HMM), the RTSRA provides a mechanism for processing location data provided by the real-time location system (RTLS) and analyzing the probability distributions of different states in terms of false positives and negatives. Simulation analysis demonstrated the logic of the proposed method and how it works. Application case shows that the proposed RTSRA is both feasible and effective in managing construction project safety concerns.

  17. Site characterization progress report: Yucca Mountain, Nevada. Progress report number 17, April 1, 1997--September 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The US Department of Energy`s (DOE) Office of Civilian Radioactive Waste Management (OCRWM), created with the enactment of the Nuclear Waste Policy Act of 1982 (NWPA), is tasked to accept and dispose of the nation`s high-level radioactive waste and spent nuclear fuel in a deep geologic repository (high-level radioactive waste program). The report summarizes significant site characterization activities during the period from April 1, 1997 through September 30, 1997, in the evaluation of Yucca Mountain as a potential site for the geologic disposal of spent nuclear fuel and high-level radioactive wastes. The progress report also cites technical reports and research products that provide the detailed information on these activities. Chapter 2 outlines technical and regulatory issues that must be addressed by the Project and planned work toward achieving future objectives concerning the viability assessment, the environmental impact statement, the site recommendation, and the license application. Chapter 3 describes technical progress in preclosure radiological safety analysis, postclosure performance assessment, and performance confirmation activities. Chapter 4 describes various aspects of repository and waste package design and construction. It also discusses the Exploration Studies Facility cross drift. Chapter 5 describes site characterization activities, and Chapter 6 contains a complete list of references.

  18. Site characterization progress report: Yucca Mountain, Nevada. Progress report number 17, April 1, 1997 - September 30, 1997

    International Nuclear Information System (INIS)

    1998-04-01

    The US Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM), created with the enactment of the Nuclear Waste Policy Act of 1982 (NWPA), is tasked to accept and dispose of the nation's high-level radioactive waste and spent nuclear fuel in a deep geologic repository (high-level radioactive waste program). The report summarizes significant site characterization activities during the period from April 1, 1997 through September 30, 1997, in the evaluation of Yucca Mountain as a potential site for the geologic disposal of spent nuclear fuel and high-level radioactive wastes. The progress report also cites technical reports and research products that provide the detailed information on these activities. Chapter 2 outlines technical and regulatory issues that must be addressed by the Project and planned work toward achieving future objectives concerning the viability assessment, the environmental impact statement, the site recommendation, and the license application. Chapter 3 describes technical progress in preclosure radiological safety analysis, postclosure performance assessment, and performance confirmation activities. Chapter 4 describes various aspects of repository and waste package design and construction. It also discusses the Exploration Studies Facility cross drift. Chapter 5 describes site characterization activities, and Chapter 6 contains a complete list of references

  19. A comparative study of floor construction on sloping sites: an analysis of cumulative energy demand and greenhouse gas emissions

    Directory of Open Access Journals (Sweden)

    Grace Ding

    2016-03-01

    Full Text Available In order to make environmentally aware decisions, there is growing interest in the comparative energy and greenhouse gas (GHG performance of competing construction methods. Little research has been done concerning competing ground floor construction methods, especially given different site variables, such as slope and soil type. A life cycle assessment approach was adopted to analyse environmental impacts, including cumulative energy demand and GHG emissions for detached housing construction in Australia. Data was drawn from 24 case study housing projects, including 12 reinforced concrete and 12 suspended timber floor projects. The data presented in the paper compares cumulative energy demand, GHG and the constituent parts of competing construction methods. The findings indicate that the timber floors use/create significantly less cumulative energy demand and GHG emissions than concrete floors—approximately 2.1 to 2.7 times less energy and 2.3 to 2.9 times less GHG. These findings are limited to the site slope and foundation soil types identified in the paper. The main application of the work is in guidance concerning the lowest environmental impact options for detached housing construction.

  20. Aerosol Number Concentrations and Visibility during Dense Fog over a Subtropical Urban Site

    Directory of Open Access Journals (Sweden)

    Manju Mohan

    2014-01-01

    Full Text Available There is now enough evidence of greater frequencies and extent of fog formation in urban areas. These could easily be linked to rapid increase in aerosol number concentration (ANC peculiar to polluted urban environments. It is therefore pertinent to study ANC and visibility alongside the meteorological parameters in order to investigate the relationships which may possibly exist between these parameters especially during foggy conditions. This study based on field measurements of ANC for aerosol spectrum varying from 0.3 µm to 20 µm attempts to investigates whether a threshold ANC could be associated with a given visibility range during low visibility conditions including dense fog episodes. Thus, the present work explores relationship between ANC size spectrum and visibility (100 m–4500 m in a polluted urban environment in India with specific reference to episodes of dense fog during winter period. The study depicts a threshold minimum value of ANC during foggy conditions. A power relationship between ANC and visibility is obtained. Further, aerosol number distribution and size distribution function are also studied and empirical relation is compared with previous studies. Further work is suggested to strengthen the findings presented here.

  1. Estimating the number of fractions by tumour site for European countries in 2012 and 2025: An ESTRO-HERO analysis.

    Science.gov (United States)

    Borras, Josep M; Grau, Cai; Corral, Julieta; Wong, Karen; Barton, Michael B; Ferlay, Jacques; Bray, Freddie; Lievens, Yolande

    2018-02-01

    The optimal number of radiotherapy fractions is a relevant input for planning resource needs. An estimation of the total number of fractions by country and tumour site is assessed for 2012 and 2025. European cancer incidence data by tumour site and country for 2012 and 2025 were extracted from the GLOBOCAN database. Incidence and stage data were introduced in the Australian Collaboration for Cancer Outcomes Research and Evaluation (CCORE) model, producing an evidence-based proportion of incident cases with an indication for radiotherapy and fractions by indication. An indication was defined as a clinical situation in which radiotherapy was the treatment of choice. The total number of fractions if radiotherapy was given according to guidelines to all patients with an indication in Europe was estimated to be 30 million for 2012; with a forecasted increase of 16.1% by 2025, yet with differences by country and tumour. The average number of fractions per course was 17.6 with a small range of differences following stage at diagnosis. Among the treatments with radical intent the average was 24 fractions, while it decreased to 2.5 among palliative treatments. An increase in the total number of fractions is expected in many European countries in the coming years following the trends in cancer incidence. In planning radiotherapy resources, these increases should be balanced to the evolution towards hypofractionation, along with increased complexity and quality assurance. Copyright © 2017 Elsevier B.V. All rights reserved.

  2. Grave number 121 of the argaric site of Castellón Alto (Galera, Granada

    Directory of Open Access Journals (Sweden)

    Molina, Fernando

    2003-06-01

    Full Text Available A new grave with partly mummified bodies was discovered during fieldwork to prepare the argaric site of Castellón Alto for public visits. Timber slabs and a dry stone wall seal the artificial cave preserving the interior. The human bones belong to one adult and one infant, both with preserved hair and skin fragments. The grave goods comprise several pottery vessels, one dagger, one ax with wooden handle, metal ornaments and fragments of flax and possibly wool.

    Recientes excavaciones en el yacimiento argárico de Castellón Alto con motivo de los trabajos de acondicionamiento para su visita publica han permitido descubrir una sepultura con restos humanos momificados en su interior. La sepultura de tipo covacha se encontraba sellada por tablones de madera y un muro de mampostería. En el interior aparecieron un individuo adulto y un infantil que conservan restos de pelo y piel. El ajuar se compone de varias vasijas cerámicas, un puñal, una azuela con mango de madera y adornos en metal, así como restos de lino y posiblemente lana.

  3. Siting, design and construction of a deep geological repository for the disposal of high level and alpha bearing wastes

    International Nuclear Information System (INIS)

    1990-06-01

    The main objective of this document is to summarize the basic principles and approaches to siting, design and construction of a deep geological repository for disposal of high level and alpha bearing radioactive wastes, as commonly agreed upon by Member States. This report is addressed to decision makers and technical managers as well as to specialists planning for siting, design and construction of geological repositories for disposal of high level and alpha bearing wastes. This document is intended to provide Member States of the IAEA with a summary outline for the responsible implementing organizations to use for siting, designing and constructing confinement systems for high level and alpha bearing radioactive waste in accordance with the protection objectives set by national regulating authorities or derived from safety fundamentals and standards of the IAEA. The protection objectives will be achieved by the isolation of the radionuclides from the environment by a repository system, which consists of a series of man made and natural safety barriers. Engineered barriers are used to enhance natural geological containment in a variety of ways. They must complement the natural barriers to provide adequate safety and necessary redundancy to the barrier system to ensure that safety standards are met. Because of the long timescales involved and the important role of the natural barrier formed by the host rock, the site selection process is a key activity in the repository design and development programme. The choice of the site, the investigation of its geological setting, the exploration of the regional hydrogeological setting and the primary underground excavations are all considered to be part of the siting process. 16 refs

  4. Case Study: LCA Methodology Applied to Materials Management in a Brazilian Residential Construction Site

    Directory of Open Access Journals (Sweden)

    João de Lassio

    2016-01-01

    Full Text Available The construction industry is increasingly concerned with improving the social, economic, and environmental indicators of sustainability. More than ever, the growing demand for construction materials reflects increased consumption of raw materials and energy, particularly during the phases of extraction, processing, and transportation of materials. This work aims to help decision-makers and to promote life cycle thinking in the construction industry. For this purpose, the life cycle assessment (LCA methodology was chosen to analyze the environmental impacts of building materials used in the construction of a residence project in São Gonçalo, Rio de Janeiro, Brazil. The LCA methodology, based on ISO 14040 and ISO 14044 guidelines, is applied with available databases and the SimaPro program. As a result, this work shows that there is a substantial waste of nonrenewable energy, increasing global warming and harm to human health in this type of construction. This study also points out that, for this type of Brazilian construction, ceramic materials account for a high percentage of the mass of a total building and are thus responsible for the majority of environmental impacts.

  5. Siting history and current construction status of disposal facility for low and intermediate level radioactive waste in Korea

    International Nuclear Information System (INIS)

    Sakai, Akihiro; Kikuchi, Saburo; Maruyama, Masakatsu

    2008-01-01

    Korean government decided disposal site for low and intermediate level radioactive waste (LILW), which is located at coastal area near the Wolsong nuclear power plants in Gyeong-Ju city in December. 2005, based on the result of votes of residents in four candidate sites. Since then, Korea Hydro and Nuclear Power Co., Ltd (KHNP), which is the management company of the LILW disposal facility, has carried out the preparation for construction of disposal facility and its licensing process. At the first phase, 100 thousand drums in 200 liter are planned to be disposed of in the rock cavern type disposal facility located at the depth from 80m to 130m below the sea level, and finally 800 thousand drums in 200 liter are planned to be disposed of in the site. This report shows the history of siting for the LILW disposal, the outline of design of disposal facility and current status of its construction, based on the information which was obtained mainly during our visit to the disposal site in Korea. (author)

  6. 75 FR 35901 - On-Site Completion of Construction of Manufactured Homes

    Science.gov (United States)

    2010-06-23

    ... consistent with the current 5-year requirement for DAPIA retention of approved designs and design changes... these documents at the job site; (h) Providing a copy of the final site inspection report and... reasonably be completed in the factory (e.g., fireplaces at marriage lines and designs that involve such...

  7. The Director-General visits the ATLAS construction site at Point 1

    CERN Multimedia

    Patrice Loiez

    1998-01-01

    Photo 05 : Claude Guitton (left), Project Manager for the EDF/Knight Piesold joint venture responsible for design and site supervision for LHC civil engineering at Point 1 takes the Director-General Chris Llewellyn Smith and LHC Project Leader Lyn Evans on a tour of the site.

  8. Gender Variations in the Effects of Number of Organizational Memberships, Number of Social Networking Sites, and Grade-Point Average on Global Social Responsibility in Filipino University Students

    Directory of Open Access Journals (Sweden)

    Romeo B. Lee

    2016-02-01

    Full Text Available The study seeks to estimate gender variations in the direct effects of (a number of organizational memberships, (b number of social networking sites (SNS, and (c grade-point average (GPA on global social responsibility (GSR; and in the indirect effects of (a and of (b through (c on GSR. Cross-sectional survey data were drawn from questionnaire interviews involving 3,173 Filipino university students. Based on a path model, the three factors were tested to determine their inter-relationships and their relationships with GSR. The direct and total effects of the exogenous factors on the dependent variable are statistically significantly robust. The indirect effects of organizational memberships on GSR through GPA are also statistically significant, but the indirect effects of SNS on GSR through GPA are marginal. Men and women significantly differ only in terms of the total effects of their organizational memberships on GSR. The lack of broad gender variations in the effects of SNS, organizational memberships and GPA on GSR may be linked to the relatively homogenous characteristics and experiences of the university students interviewed. There is a need for more path models to better understand the predictors of GSR in local students.

  9. Gender Variations in the Effects of Number of Organizational Memberships, Number of Social Networking Sites, and Grade-Point Average on Global Social Responsibility in Filipino University Students

    Science.gov (United States)

    Lee, Romeo B.; Baring, Rito V.; Sta. Maria, Madelene A.

    2016-01-01

    The study seeks to estimate gender variations in the direct effects of (a) number of organizational memberships, (b) number of social networking sites (SNS), and (c) grade-point average (GPA) on global social responsibility (GSR); and in the indirect effects of (a) and of (b) through (c) on GSR. Cross-sectional survey data were drawn from questionnaire interviews involving 3,173 Filipino university students. Based on a path model, the three factors were tested to determine their inter-relationships and their relationships with GSR. The direct and total effects of the exogenous factors on the dependent variable are statistically significantly robust. The indirect effects of organizational memberships on GSR through GPA are also statistically significant, but the indirect effects of SNS on GSR through GPA are marginal. Men and women significantly differ only in terms of the total effects of their organizational memberships on GSR. The lack of broad gender variations in the effects of SNS, organizational memberships and GPA on GSR may be linked to the relatively homogenous characteristics and experiences of the university students interviewed. There is a need for more path models to better understand the predictors of GSR in local students. PMID:27247700

  10. Gender Variations in the Effects of Number of Organizational Memberships, Number of Social Networking Sites, and Grade-Point Average on Global Social Responsibility in Filipino University Students.

    Science.gov (United States)

    Lee, Romeo B; Baring, Rito V; Sta Maria, Madelene A

    2016-02-01

    The study seeks to estimate gender variations in the direct effects of (a) number of organizational memberships, (b) number of social networking sites (SNS), and (c) grade-point average (GPA) on global social responsibility (GSR); and in the indirect effects of (a) and of (b) through (c) on GSR. Cross-sectional survey data were drawn from questionnaire interviews involving 3,173 Filipino university students. Based on a path model, the three factors were tested to determine their inter-relationships and their relationships with GSR. The direct and total effects of the exogenous factors on the dependent variable are statistically significantly robust. The indirect effects of organizational memberships on GSR through GPA are also statistically significant, but the indirect effects of SNS on GSR through GPA are marginal. Men and women significantly differ only in terms of the total effects of their organizational memberships on GSR. The lack of broad gender variations in the effects of SNS, organizational memberships and GPA on GSR may be linked to the relatively homogenous characteristics and experiences of the university students interviewed. There is a need for more path models to better understand the predictors of GSR in local students.

  11. Advances and Challenges in the Implementation of DiD in Siting, Design, and Construction of Nuclear Installations in Vietnam

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, H.A., E-mail: nhanh@varans.vn [Vietnam Agency for Radiation and Nuclear Safety, Hanoi (Viet Nam)

    2014-10-15

    Vietnam is embarking on a development of a nuclear power program. The main focus is now on the initial 1000 MWe x 2 units of the nuclear power plant in Ninh Thuan province. Now, the nuclear projects of Vietnam are in the phase of siting approval and investment projects approval. The design assessment will be performed in 2013-2014; the construction and installation will be performed from now until the operating licensing is obtained in 2020-2021. With state of development of a nuclear power program in Vietnam, this paper only focuses on advances and challenges in the implementation of Defence in Depth (DID) in siting, design, and construction of nuclear installations in Vietnam. (author)

  12. Characteristics and distribution of trulli constructions in the area of the site of community importance Murgia of Trulli

    Directory of Open Access Journals (Sweden)

    Giuseppe Ruggiero

    2013-10-01

    Full Text Available The agro-forestry territory in the Region of Apulia, southern Italy, is characterised by a widespread and diversified presence of dry stone constructions, including trulli, rural buildings with a characteristic a conical shape. The trulli are mainly to be found in the central and eastern part of the region, called Murgia of Trulli. Trulli are perfectly integrated with the agro-environment specificity of the area, creating a unique landscape and establishing themselves as a testimony of tradition and rural culture. In fact, in this area, from the 17th until the mid-20th century, the trulli accompanied the development of agricultural activities. According to the number of cones they had, they were used as temporary shelters, places of support for primary production, or comfortable houses for the rural population. In recent decades, for several social and economic reasons, this heritage of rural buildings has been affected by abandonment and degradation phenomena. Interventions aimed at recovery and re-use have not always respected the origin of the buildings, their design characteristics or the landscape in which they had been built. In order to reduce the impact that this situation has had on environmental and territorial quality it is, therefore, necessary to develop initiatives to protect and valorise the trulli while respecting the identity of place, the architectural elements, and the agricultural and environmental characteristics of the territory. For this purpose, we need to analyse and characterise the heritage of the existing trulli and its relationship with the local reality. The present paper analyses the typology and distribution of the trulli located on the site of community importance Murgia of Trulli, a protected area with high environmental value in the central-eastern area of the Region of Apulia. Specifically, we analysed the relationship between the trulli buildings and the agro-environment context to acquire a basic

  13. Multi criteria analysis in environmental management: Selecting the best stormwater erosion and sediment control measure in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd; Desa, Mohamed Nor Mohamed [Civil Engineering, Universiti Tenga Nasional, Kajang, Selangor (Malaysia); Basri, Noor Ezlin Ahmad [Civil and Structural Engineering, Universiti Kebangsaan Malyasia, Bangi, Selangor (Malaysia)

    2011-07-01

    Malaysia located in a tropical region which is interested with a heavy rainfall through the whole seasons of the year. Construction stages usually associated with soil disturbing due to land clearing and grading activities, this combined with the tropical climate in Malaysia, will generate an enormous amount of soil to be eroded and then deposited in the adjacent water bodies. There are many kinds of mitigation measures used so as to reduce the impact of erosion and sedimentation that are generated due to the stormwater in construction sites. This paper presents the application of Multi Criteria Analysis (MCA) tool in choosing the best stormwater control measure by depending on specified criteria and criterion weight. The results obtained from the application of MCA in stormwater pollution control have many benefits to the contractors, consultants and decision makers by making them able to select the best control measure for every stage of construction.

  14. Development of MCESC software for selecting the best stormwater erosion and sediment control measure in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd [Civil Engineering Universiti Tenaga Nasional, Kajan, Selangor (Malaysia); Desa, Mohamed Nor Mohamed; Basri, Noor Ezlin Ahmad [Civil and Structural Engineering, Universiti Kebangsaan Malaysia, Bangi, Selangor (Malaysia)

    2012-07-01

    Malaysia located in a tropical region which is interested with a heavy rainfall through the whole seasons of the year. Construction stages usually associated with soil disturbing due to land clearing and grading activities, this combined with the tropical climate in Malaysia, will generate an enormous amount of soil to be eroded and then deposited into the adjacent water bodies. There are many kinds of mitigation measures used so as to reduce the impact of erosion and sedimentation that are generated due to the stormwater in construction sites. This paper aims to develop and apply Multi Criteria Analysis (MCA) software called Multi Criteria Erosion and Sediment Control (MCESC) software in which it can be applied in selecting the best stormwater control measure by depending on specified criteria and criterion weight. Visual Basic 6 was adopted as a development tool. This software can help the engineers, contractors on site and decision makers to find the best stormwater control measure in any construction site in Malaysia. Users of the MCESC software are given the opportunity to select the best stormwater control measure via expert's judgments that are built in the system or via their own expertise. MCESC software has many benefits since the experts are not always available and the consultancy is a costly issue which add further financial allocations to the project.

  15. Experimental Setup for Evaluation of the Protective Technical Measures Against the Slopes Degradation Along Linear Construction Sites

    Science.gov (United States)

    Kavka, Petr; Zumr, David; Neumann, Martin; Lidmila, Martin; Dufka, Dušan

    2017-04-01

    Soil erosion of the slopes along the linear construction sites, such as railroads, roads, pipelines or watercourses, is usually underestimated by the construction companies and controlling authorities. But under certain circumstances, when the construction site is not maintained and protected properly, a large amounts of soil may be transported from the sites to the surrounding environment during the intensive rainfall. Transported sediment, often carrying adsorbed pollutants, may reach watercourses and cause water recipient siltation and pollution. Within the applied research project we investigate ways of low cost, quick and easy technical measures that would help to protect the slopes against the splash erosion, rills development and sliding. The methodology is based on testing of various permeable covers, sheets, anchoring and patchy vegetation on a plot and hillslope scales. In this contribution we will present the experimental plot setup, consisting of large soil blocks encapsulated in the monitored steel containers and nozzle rainfall simulator. The presentation is funded by the Technological Agency of the Czech Republic (research project TH02030428) and an internal student CTU grant.

  16. Selection of adequate site location during early stages of construction project management: A multi-criteria decision analysis approach

    Science.gov (United States)

    Marović, Ivan; Hanak, Tomaš

    2017-10-01

    In the management of construction projects special attention should be given to the planning as the most important phase of decision-making process. Quality decision-making based on adequate and comprehensive collaboration of all involved stakeholders is crucial in project’s early stages. Fundamental reasons for existence of this problem arise from: specific conditions of construction industry (final products are inseparable from the location i.e. location has a strong influence of building design and its structural characteristics as well as technology which will be used during construction), investors’ desires and attitudes, and influence of socioeconomic and environment aspects. Considering all mentioned reasons one can conclude that selection of adequate construction site location for future investment is complex, low structured and multi-criteria problem. To take into account all the dimensions, the proposed model for selection of adequate site location is devised. The model is based on AHP (for designing the decision-making hierarchy) and PROMETHEE (for pairwise comparison of investment locations) methods. As a result of mixing basis feature of both methods, operational synergies can be achieved in multi-criteria decision analysis. Such gives the decision-maker a sense of assurance, knowing that if the procedure proposed by the presented model has been followed, it will lead to a rational decision, carefully and systematically thought out.

  17. Health Promotion at the Construction Work Site: The Lunch Truck Pilot Study.

    Science.gov (United States)

    Caban-Martinez, Alberto J; Moore, Kevin J; Clarke, Tainya C; Davila, Evelyn P; Clark, John D; Lee, David J; Fleming, Lora E

    2018-04-01

    The transient nature of construction work makes it difficult to conduct longitudinal worksite-based health promotion activities. As part of a workplace health assessment pilot study, we worked with a commercial lunch truck company to disseminate four types of health education materials including cancer screening, workplace injury prevention, fruit and vegetable consumption, and smoking cessation to construction workers purchasing food items from the truck during their job breaks. Two weeks following the worksite assessment, we followed up with these workers to ascertain their use of the health promotion materials. Of the 54 workers surveyed, 83% reported reviewing and sharing the cancer screening materials with their families, whereas 44% discussed the cancer screening materials with coworkers. Similar proportions of workers reviewed, shared, and discussed the other health promotion materials with their family. Lunch trucks may be an effective strategy and delivery method for educating construction workers on healthy behaviors and injury prevention practices.

  18. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and Other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA)

    Science.gov (United States)

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  19. Construction site workers' malaria knowledge and treatment-seeking pattern in a highly endemic urban area of India.

    Science.gov (United States)

    Shivalli, Siddharudha; Pai, Sudarshan; Akshaya, Kibballi Madhukeshwar; D'Souza, Neevan

    2016-03-16

    Construction sites are potential breeding places for some species of mosquitoes. Construction workers usually stay at the construction sites, thus being extremely susceptible to malaria. For malaria control, a special focus on them is warranted as they often seek treatment from unregulated, private vendors, increasing their risk of exposure to substandard drugs. To elicit the socio-demographic factors associated with comprehensive malaria knowledge (symptoms, mode of spread, and preventive measures) and treatment-seeking pattern (preferred source and type of treatment) among the construction workers in Mangaluru, India; and, to study the association among their comprehensive malaria knowledge, past suffering from malaria (within 1 year) and treatment-seeking pattern. A community based cross-sectional study was conducted in nine randomly selected construction sites of Mangaluru, a high-risk city for malaria with an annual parasite incidence of >2/1000/year, from June-September 2012. A sample size of 132 was estimated assuming at least 30% of them have satisfactory malaria knowledge, 10% absolute precision, 95% confidence level, design effect of 1.5 and 10% non-responses. A semi-structured interview schedule was used, and knowledge scores were computed. Multivariate linear (for knowledge score) and logistic regressions (for preferred source and type of treatment) were applied. One hundred and nineteen workers participated in the study (total approached-138). 85% (n = 101) of them were males. Mean knowledge score was 9.95 ± 3.19 (maximum possible score-16). The majority of them were aware of the symptoms and the mode of malaria transmission. However, workers (β = -0.281, p = 0.001), self stated malaria within 1 year (β = 0.276, p workers (AdjOR 7.21, 95% CI 2.3-22.9) and those with self stated malaria within 1 year (AdjOR 11.21, 95% CI 2.38-52.8) showed favorable treatment-seeking pattern. There is an urgent need of intensifying and streamlining of ongoing malaria

  20. The Impact of Transformational Leadership on Safety Climate and Individual Safety Behavior on Construction Sites

    Directory of Open Access Journals (Sweden)

    Yuzhong Shen

    2017-01-01

    Full Text Available Unsafe acts contribute dominantly to construction accidents, and increasing safety behavior is essential to reduce accidents. Previous research conceptualized safety behavior as an interaction between proximal individual differences (safety knowledge and safety motivation and distal contextual factors (leadership and safety climate. However, relatively little empirical research has examined this conceptualization in the construction sector. Given the cultural background of the sample, this study makes a slight modification to the conceptualization and views transformational leadership as an antecedent of safety climate. Accordingly, this study establishes a multiple mediator model showing the mechanisms through which transformational leadership translates into safety behavior. The multiple mediator model is estimated by the structural equation modeling (SEM technique, using individual questionnaire responses from a random sample of construction personnel based in Hong Kong. As hypothesized, transformational leadership has a significant impact on safety climate which is mediated by safety-specific leader–member exchange (LMX, and safety climate in turn impacts safety behavior through safety knowledge. The results suggest that future safety climate interventions should be more effective if supervisors exhibit transformational leadership, encourage construction personnel to voice safety concerns without fear of retaliation, and repeatedly remind them about safety on the job.

  1. The Impact of Transformational Leadership on Safety Climate and Individual Safety Behavior on Construction Sites.

    Science.gov (United States)

    Shen, Yuzhong; Ju, Chuanjing; Koh, Tas Yong; Rowlinson, Steve; Bridge, Adrian J

    2017-01-05

    Unsafe acts contribute dominantly to construction accidents, and increasing safety behavior is essential to reduce accidents. Previous research conceptualized safety behavior as an interaction between proximal individual differences (safety knowledge and safety motivation) and distal contextual factors (leadership and safety climate). However, relatively little empirical research has examined this conceptualization in the construction sector. Given the cultural background of the sample, this study makes a slight modification to the conceptualization and views transformational leadership as an antecedent of safety climate. Accordingly, this study establishes a multiple mediator model showing the mechanisms through which transformational leadership translates into safety behavior. The multiple mediator model is estimated by the structural equation modeling (SEM) technique, using individual questionnaire responses from a random sample of construction personnel based in Hong Kong. As hypothesized, transformational leadership has a significant impact on safety climate which is mediated by safety-specific leader-member exchange (LMX), and safety climate in turn impacts safety behavior through safety knowledge. The results suggest that future safety climate interventions should be more effective if supervisors exhibit transformational leadership, encourage construction personnel to voice safety concerns without fear of retaliation, and repeatedly remind them about safety on the job.

  2. Nuclear power plant construction and financial assistance - as regards subsidies for promotion of power plant siting

    International Nuclear Information System (INIS)

    Shindo, M.

    1983-01-01

    This paper describes the institutional framework for the granting of subsidies in particular to promote nuclear power plant construction in Japan. It also analyses the technical criteria applied and lists the type of improvements to various facilities and equipment made with such subsidies. (NEA) [fr

  3. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Science.gov (United States)

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  4. The Impact of Transformational Leadership on Safety Climate and Individual Safety Behavior on Construction Sites

    Science.gov (United States)

    Shen, Yuzhong; Ju, Chuanjing; Koh, Tas Yong; Rowlinson, Steve; Bridge, Adrian J.

    2017-01-01

    Unsafe acts contribute dominantly to construction accidents, and increasing safety behavior is essential to reduce accidents. Previous research conceptualized safety behavior as an interaction between proximal individual differences (safety knowledge and safety motivation) and distal contextual factors (leadership and safety climate). However, relatively little empirical research has examined this conceptualization in the construction sector. Given the cultural background of the sample, this study makes a slight modification to the conceptualization and views transformational leadership as an antecedent of safety climate. Accordingly, this study establishes a multiple mediator model showing the mechanisms through which transformational leadership translates into safety behavior. The multiple mediator model is estimated by the structural equation modeling (SEM) technique, using individual questionnaire responses from a random sample of construction personnel based in Hong Kong. As hypothesized, transformational leadership has a significant impact on safety climate which is mediated by safety-specific leader–member exchange (LMX), and safety climate in turn impacts safety behavior through safety knowledge. The results suggest that future safety climate interventions should be more effective if supervisors exhibit transformational leadership, encourage construction personnel to voice safety concerns without fear of retaliation, and repeatedly remind them about safety on the job. PMID:28067775

  5. A system to test the ground surface conditions of construction sites--for safe and efficient work without physical strain.

    Science.gov (United States)

    Koningsveld, Ernst; van der Grinten, Maarten; van der Molen, Henk; Krause, Frank

    2005-07-01

    Ground surface conditions on construction sites have an important influence on the health and safety of workers and their productivity. The development of an expert-based "working conditions evaluation" system is described, intended to assist site managers in recognising unsatisfactory ground conditions and remedying these. The system was evaluated in the period 2002-2003. The evaluation shows that companies recognize poor soil/ground conditions as problematic, but are not aware of the specific physical workload hazards. The developed methods allow assessment of the ground surface quality and selection of appropriate measures for improvement. However, barriers exist at present to wide implementation of the system across the industry. Most significant of these is that responsibility for a site's condition is not clearly located within contracting arrangements, nor is it a topic of serious negotiation.

  6. Construction of permanently inducible miRNA-based expression vectors using site-specific recombinases

    Directory of Open Access Journals (Sweden)

    Garwick-Coppens Sara E

    2011-11-01

    Full Text Available Abstract Background RNA interference (RNAi is a conserved gene silencing mechanism mediated by small inhibitory microRNAs (miRNAs. Promoter-driven miRNA expression vectors have emerged as important tools for delivering natural or artificially designed miRNAs to eukaryotic cells and organisms. Such systems can be used to query the normal or pathogenic functions of natural miRNAs or messenger RNAs, or to therapeutically silence disease genes. Results As with any molecular cloning procedure, building miRNA-based expression constructs requires a time investment and some molecular biology skills. To improve efficiency and accelerate the construction process, we developed a method to rapidly generate miRNA expression vectors using recombinases instead of more traditional cut-and-paste molecular cloning techniques. In addition to streamlining the construction process, our cloning strategy provides vectors with added versatility. In our system, miRNAs can be constitutively expressed from the U6 promoter, or inducibly expressed by Cre recombinase. We also engineered a built-in mechanism to destroy the vector with Flp recombinase, if desired. Finally, to further simplify the construction process, we developed a software package that automates the prediction and design of optimal miRNA sequences using our system. Conclusions We designed and tested a modular system to rapidly clone miRNA expression cassettes. Our strategy reduces the hands-on time required to successfully generate effective constructs, and can be implemented in labs with minimal molecular cloning expertise. This versatile system provides options that permit constitutive or inducible miRNA expression, depending upon the needs of the end user. As such, it has utility for basic or translational applications.

  7. Importance of Viral Sequence Length and Number of Variable and Informative Sites in Analysis of HIV Clustering.

    Science.gov (United States)

    Novitsky, Vlad; Moyo, Sikhulile; Lei, Quanhong; DeGruttola, Victor; Essex, M

    2015-05-01

    To improve the methodology of HIV cluster analysis, we addressed how analysis of HIV clustering is associated with parameters that can affect the outcome of viral clustering. The extent of HIV clustering and tree certainty was compared between 401 HIV-1C near full-length genome sequences and subgenomic regions retrieved from the LANL HIV Database. Sliding window analysis was based on 99 windows of 1,000 bp and 45 windows of 2,000 bp. Potential associations between the extent of HIV clustering and sequence length and the number of variable and informative sites were evaluated. The near full-length genome HIV sequences showed the highest extent of HIV clustering and the highest tree certainty. At the bootstrap threshold of 0.80 in maximum likelihood (ML) analysis, 58.9% of near full-length HIV-1C sequences but only 15.5% of partial pol sequences (ViroSeq) were found in clusters. Among HIV-1 structural genes, pol showed the highest extent of clustering (38.9% at a bootstrap threshold of 0.80), although it was significantly lower than in the near full-length genome sequences. The extent of HIV clustering was significantly higher for sliding windows of 2,000 bp than 1,000 bp. We found a strong association between the sequence length and proportion of HIV sequences in clusters, and a moderate association between the number of variable and informative sites and the proportion of HIV sequences in clusters. In HIV cluster analysis, the extent of detectable HIV clustering is directly associated with the length of viral sequences used, as well as the number of variable and informative sites. Near full-length genome sequences could provide the most informative HIV cluster analysis. Selected subgenomic regions with a high extent of HIV clustering and high tree certainty could also be considered as a second choice.

  8. Building technology on construction site of nuclear power plant at Zaporozh'e

    Energy Technology Data Exchange (ETDEWEB)

    Dusek, R; Matyas, V [Vodni Stavby, Prague (Czechoslovakia)

    1981-12-01

    Basic data and technical and economic indexes are shown for a WWER 1000 nuclear power plant being built 120 km off Zaporozh'e (USSR). The schedule of construction and the choice of the means of mechanization used for building work are reported. Discussed are building machines used, the location of assembly cranes of the main unit, the design and the building technology of the reactor part, the engine house, deisel generator station, the special operations building, the use of concrete and steel units in the building, and the procurement of materials for the construction. The knowledge gained from the building of the power plant will be applied in the CSSR in the building of 1000 MW unit power plants.

  9. Erosion and sedimentation control on roads and construction sites in the Federated States of Micronesia

    Science.gov (United States)

    Robert R. Ziemer; Walter F. Megahan

    1991-01-01

    Enclosed is the report that Walt Megahan and I prepared following our trip to States of Micronesia. As we discussed earlier, we felt that it was redundant to produce a set of guidelines for road construction since the FAO Conservation Guide 13/5 that was issued in 1989 (ISBN 92-5-102789-X) covers the subject extensively. We felt that we could best tailor this report to...

  10. Drainage filters and constructed wetlands to mitigate site-specific nutrient losses

    DEFF Research Database (Denmark)

    Kjærgaard, Charlotte; Hoffmann, Carl Christian; Iversen, Bo Vangsø

    Despite substantial efforts, the leaching of nutrients from agricultural land is still a serious and costly environmental problem in Denmark and elsewhere. The quality goals of the European Water Framework Directive (WFD) for the aquatic environment require a substantial reduction of diffuse nutr...... drainage. The project studies different approaches of implementing the filter technologies including drainage well or drainage pipe filters as well as surface-flow and sub-surface flow constructed wetlands....

  11. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  12. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    International Nuclear Information System (INIS)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures

  13. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    International Nuclear Information System (INIS)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE's satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson

  14. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    International Nuclear Information System (INIS)

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE

  15. Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site

    International Nuclear Information System (INIS)

    2003-01-01

    This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF 6 ) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF 6 stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the ''Federal Register'' (FR) on September 18, 2001 (''Federal Register'', Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF 6 conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (''United States Code'', Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (''Code of Federal Regulations'', Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF 6 conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a ''Federal Register'' Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (DandD) of the proposed conversion facility at three alternative locations within the Paducah site; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products

  16. Characterization and remediation of soil prior to construction of an on-site disposal facility at Fernald

    International Nuclear Information System (INIS)

    Hunt, A.; Jones, G.; Nelson, K.

    1998-03-01

    During the production years at the Feed Materials Production Center (FMPC), the soil of the site and the surrounding areas was surficially impacted by airborne contamination. The volume of impacted soil is estimated at 2.2 million cubic yards. During site remediation, this contamination will be excavated, characterized, and disposed of. In 1986 the US Environmental Protection Agency (EPA) and the Department of Energy (DOE) entered into a Federal Facility Compliance Agreement (FFCA) covering environmental impacts associated with the FMPC. A site wide Remedial Investigation/Feasibility Study (RI/FS) was initiated pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act, as amended by the Superfund Amendments and Reauthorization Act (CERCLA). The DOE has completed the RI/FS process and has received approval of the final Records of Decision. The name of the facility was changed to the Fernald Environmental Management Project (FEMP) to emphasize the change in mission to environmental restoration. Remedial actions which address similar scopes of work or types of contaminated media have been grouped into remedial projects for the purpose of managing the remediation of the FEMP. The Soil Characterization and Excavation Project (SCEP) will address the remediation of FEMP soils, certain waste units, at- and below-grade material, and will certify attainment of the final remedial limits (FRLs) for the FEMP. The FEMP will be using an on-site facility for low level radioactive waste disposal. The facility will be an above-ground engineered structure constructed of geological material. The area designated for construction of the base of the on-site disposal facility (OSDF) is referred to as the footprint. Contaminated soil within the footprint must be identified and remediated. Excavation of Phase 1, the first of seven remediation areas, is complete

  17. Requirements and criteria for choosing sites suitable for the construction of nuclear installations and power stations

    International Nuclear Information System (INIS)

    1978-05-01

    The present document explains the selection criteria for areas in Italy suitable for the installation of nuclear power stations to be included in the 'National Site Map' provided for in Section 23 of Act No 393 of 2 August 1975. It represents the results of a thorough investigation into the various aspects of the problem of siting nuclear power stations, at the present stage of technology, taking into account the effect of the installations on the environment and the effect of the environment on the installations. The essential aim is to demonstrate that the requirements derived from these analyses, and on which there was full consultation with the other controlling bodies of European countries (in particular, France, Great Britain and West Germany) ensure the optimum choice of areas from the point of view of safety and public health. (author)

  18. Experience in applying quality assurance to civil construction work on the Heysham site

    International Nuclear Information System (INIS)

    Wise, D.L.

    1985-01-01

    A comparison of the civil construction works experience on Heysham I nuclear power plant with that of Heysham II following the introduction of a quality system provided on insight into the benefits resulting from quality assurance. These included: improved administration, better identification of responsibility and improved communications, improved pre-planning, better records, and greater control over activities with Suppliers and Sub-contractors. For Heysham II the full benefits of quality assurance were realised by integrating it into the management system and through the practical understanding achieved with the Client. (U.K.)

  19. Development of the radiological protection focus in the site, design and construction of the nuclear power plant in Cuba

    International Nuclear Information System (INIS)

    Rodriguez R, J.M.

    1996-01-01

    The first nuclear station in Cuba NPP Juragua, at present in analysis for starting again the construction, under a multinational economic association, had had as main architect/engineer organization the Design Institute for Nuclear Power Stations of St. Petersburg (former LIAEP). Active participation of Cuban radiation protection specialist of Energoproyecto in the Juragua Project began at the beginning of the site selection works and continued in the design and construction stages up till now, and simultaneously our specialists have been acting as a counterpart of soviet designers, responsible for the general design of the station. Furthermore, some additional works in compliance with the latest safety requirements and the best international practices, which are described, as well as ongoing and planned work were performed. (author). 11 refs., 3 figs

  20. Environmental assessment for the construction, operation, and decommissioning of the Waste Segregation Facility at the Savannah River Site

    International Nuclear Information System (INIS)

    1998-01-01

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the construction, operation and decontamination and decommissioning (D ampersand D) of the Waste Segregation Facility (WSF) for the sorting, shredding, and compaction of low-level radioactive waste (LLW) at the Savannah River Site (SRS) located near Aiken, South Carolina. The LLW to be processed consists of two waste streams: legacy waste which is currently stored in E-Area Vaults of SRS and new waste generated from continuing operations. The proposed action is to construct, operate, and D ampersand D a facility to process low-activity job-control and equipment waste for volume reduction. The LLW would be processed to make more efficient use of low-level waste disposal capacity (E-Area Vaults) or to meet the waste acceptance criteria for treatment at the Consolidated Incineration Facility (CIF) at SRS

  1. Site selection of the construction of the system for the production of pasta in AP Vojvodina

    Directory of Open Access Journals (Sweden)

    Paunović Goran

    2017-01-01

    Full Text Available In the growing race for the market share, companies geographically position their production and office buildings according to the new business rules. In order for the company to survive in the market, it is necessary to maximize the profit, minimize the costs, maintain a good quality of the product and constantly improve it. The choice of location is one of the vital decisions in the process of building of a production system, although the selection of the location is a problem related to certain time sections in the life of a given production system, the need for research on the effect locations have is stable in time. The aim of the research is the methodological approach to the selection criteria of broader and narrower location for the construction of the production system for pastry production in Vojvodina as an area which has a rich base in raw material. The Agricultural and food industry as branches of industry have a long time tradition as well as a great potential in strengthening economic performances of the Economy of Vojvodina. Evaluation criteria and their use in the model of dimensional analysis will allow a good selection of a good location for the construction of the business systems for the production of pastry.

  2. Proposed training program for construction personnel involved in remedial action work at sites contaminated by naturally occurring radionuclides

    International Nuclear Information System (INIS)

    Berven, B.A.; Goldsmith, W.A.; Haywood, F.F.; Schiager, K.J.

    1979-01-01

    Many sites used during the early days of the US atomic energy program are contaminated with radionuclides of the primordial decay chains (uranium, thorium, and actinium series). This contamination consists of residues resulting from refining and processing uranium and thorium. Preparation of these sites for release to unrestricted private use will involve the assistance of construction workers, many of whom have limited knowledge of the hazards associated with radioactive materials. Therefore, there is a need to educate these workers in the fundamentals of radioactive material handling to minimize exposures and possible spread of contamination. This training should disseminate relevant information at an appropriate educational level and should instill a cautious, common-sense attitude toward the handling of radioactive materials. The training should emphasize basic information concerning environmental radiation within a context of relative risk. A multi-media format, including colorful visual aids, demonstration, and discussion, should be used to maximize motivation and retention. A detailed, proposed training program design is presented

  3. Design and Construction of Deinococcus Radiodurans for Biodegradation of Organic Toxins at Radioactive DOE Waste Sites

    International Nuclear Information System (INIS)

    Daly, Michael J.; Wackett, Lawrence P.; Fredrickson, James K.

    2001-01-01

    Seventy million cubic meters of ground and three trillion liters of groundwater have been contaminated by leaking radioactive waste generated in the United States during the Cold War. A cleanup technology is being developed based on the extremely radiation resistant bacterium Deinococcus radiodurans that is being engineered to express bioremediating functions. Research aimed at developing D. radiodurans for organic toxin degradation in highly radioactive waste sites containing radionuclides, heavy metals, and toxic organic compounds was started by this group.Work funded by the existing grant has already contributed to eleven papers on the fundamental biology of D. radiodurans and its design for bioremediation of highly radioactive waste environments

  4. Criteria and results from the analysis of the problem of site selection for the construction of high level RAW repository

    International Nuclear Information System (INIS)

    Evstatiev, D.; Kozhoukharova, D.; Iliev, I.; Karagyuleva, J.

    1993-02-01

    The criteria for preliminary assessment of the Bulgarian territory and the results of the selection of prospective sites for future investigation concerning the choice of the suitable places for RAW repositories are presented. The selection of the prospective terrains has been performed in two stages: 1) Categorization of the country according to the prospective conditions for suitable sites and 2) Distinguishing and preliminary assessment of the suitable sites. The number of these sites was reduced to 20 by the method of successive screening. They are located in Northwest and Southeast Bulgaria and are built of marls, clays, granite, gneiss, serpentine and and volcanic rocks. The selected 20 sites has been subjected to preliminary investigation according to a programme specially worked out for the purpose. The investigation covers the analysis and summing up of the available geographical, geomorphological, geological, seismotectonic, hydrological, climatic, hydrogeological and geotechnical data, as well as a minimum of additional field research and laboratory tests. The results of the investigation of each site are presented and discussed. 1 ref

  5. Construction of an Unmarked Zymomonas mobilis Mutant Using a Site-Specific FLP Recombinase

    Directory of Open Access Journals (Sweden)

    Shao-Lan Zou

    2012-01-01

    Full Text Available Flippase expression was carried out in Zymomonas mobilis strain ZM4. The FRT-flanked selection marker gene was first integrated into the ZM4 chromosome by homologous recombination. The Saccharomyces cerevisiae flp gene was then introduced under the control of the ZM4 gap gene promoter (Pgap, encoding glyceraldehyde-3-phosphate dehydrogenase or the λ bacteriophage cI857-pR contained in the broad-host-range cloning vector pBBR1-MCS-2. This study demonstrated that flp was expressed and that the deletion frequency of the FRT-flanked marker gene was very high (approx. 100 %. In addition, the flp gene expression vector could be conveniently removed from the resulting unmarked Z. mobilis mutants by serially transferring the cells three times into antibiotic-free medium, thereby establishing an efficient method for constructing unmarked Z. mobilis mutants.

  6. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site. FY 1989--1990 annual report

    Energy Technology Data Exchange (ETDEWEB)

    Pechmann, J.H.K.; Scott, D.E.; McGregor, J.H.; Estes, R.A.; Chazal, A.C.

    1993-02-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980`s. The Savannah River Ecology Laboratory (SREL) has completed 12 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ``refuge ponds`` as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10CFR1022).

  7. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY-1991 and FY-1992

    Energy Technology Data Exchange (ETDEWEB)

    Scott, D.E.; Chazel, A.C.; Pechmann, J.H.K.; Estes, R.A.

    1993-06-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980`s. The Savannah River Ecology Laboratory (SREL) has completed 14 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ``refuge ponds`` as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022).

  8. Draft environmental impact statement siting, construction, and operation of New Production Reactor capacity. Volume 4, Appendices D-R

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.

  9. Constructing sites at a large scale - towards new design (education) methods

    DEFF Research Database (Denmark)

    Braae, Ellen Marie; Tietjen, Anne

    2010-01-01

    of the design disciplines within the development of our urban landscapes. At the same time, urban and landscape designers are confronted with new methodological problems. Within a strategic transformation perspective the formulation of the design problem or brief becomes an integrated part of the design process......Since the 1990s the regional scale has regained importance in urban and landscape design. In parallel, the focus in design tasks has shifted from master plans for urban extension to strategic urban transformation projects. The current paradigm of planning by projects reinforces the role....... This paper discusses new design (education) methods based on a relational concept of urban sites and design processes using the actor-network-theory as theoretical frame....

  10. Radon exhalation of hardening concrete: monitoring cement hydration and prediction of radon concentration in construction site.

    Science.gov (United States)

    Kovler, Konstantin

    2006-01-01

    The unique properties of radon as a noble gas are used for monitoring cement hydration and microstructural transformations in cementitious system. It is found that the radon concentration curve for hydrating cement paste enclosed in the chamber increases from zero (more accurately - background) concentrations, similar to unhydrated cement. However, radon concentrations developed within 3 days in the test chamber containing cement paste were approximately 20 times higher than those of unhydrated cement. This fact proves the importance of microstructural transformations taking place in the process of cement hydration, in comparison with cement grain, which is a time-stable material. It is concluded that monitoring cement hydration by means of radon exhalation method makes it possible to distinguish between three main stages, which are readily seen in the time dependence of radon concentration: stage I (dormant period), stage II (setting and intensive microstructural transformations) and stage III (densification of the structure and drying). The information presented improves our understanding of the main physical mechanisms resulting in the characteristic behavior of radon exhalation in the course of cement hydration. The maximum value of radon exhalation rate observed, when cement sets, can reach 0.6 mBq kg(-1) s(-1) and sometimes exceeds 1.0 mBq kg(-1) s(-1). These values exceed significantly to those known before for cementitious materials. At the same time, the minimum ventilation rate accepted in the design practice (0.5 h(-1)), guarantees that the concentrations in most of the cases will not exceed the action level and that they are not of any radiological concern for construction workers employed in concreting in closed spaces.

  11. The effect of relational constructs on customer referrals and number of services purchases from a multi-service provider: Does age of a relationship matter?

    NARCIS (Netherlands)

    Ph.H.B.F. Franses (Philip Hans); P.C. Verhoef (Peter); J.C. Hoekstra (Janny)

    2002-01-01

    textabstractThe authors examine the effect of relational constructs (e.g., satisfaction, trust, and affective and calculative commitment) on customer referrals and the number of services purchased, as well as the moderating effect of age of the relationship on these relationships. The research

  12. Cross-site comparison of ribosomal depletion kits for Illumina RNAseq library construction.

    Science.gov (United States)

    Herbert, Zachary T; Kershner, Jamie P; Butty, Vincent L; Thimmapuram, Jyothi; Choudhari, Sulbha; Alekseyev, Yuriy O; Fan, Jun; Podnar, Jessica W; Wilcox, Edward; Gipson, Jenny; Gillaspy, Allison; Jepsen, Kristen; BonDurant, Sandra Splinter; Morris, Krystalynne; Berkeley, Maura; LeClerc, Ashley; Simpson, Stephen D; Sommerville, Gary; Grimmett, Leslie; Adams, Marie; Levine, Stuart S

    2018-03-15

    Ribosomal RNA (rRNA) comprises at least 90% of total RNA extracted from mammalian tissue or cell line samples. Informative transcriptional profiling using massively parallel sequencing technologies requires either enrichment of mature poly-adenylated transcripts or targeted depletion of the rRNA fraction. The latter method is of particular interest because it is compatible with degraded samples such as those extracted from FFPE and also captures transcripts that are not poly-adenylated such as some non-coding RNAs. Here we provide a cross-site study that evaluates the performance of ribosomal RNA removal kits from Illumina, Takara/Clontech, Kapa Biosystems, Lexogen, New England Biolabs and Qiagen on intact and degraded RNA samples. We find that all of the kits are capable of performing significant ribosomal depletion, though there are differences in their ease of use. All kits were able to remove ribosomal RNA to below 20% with intact RNA and identify ~ 14,000 protein coding genes from the Universal Human Reference RNA sample at >1FPKM. Analysis of differentially detected genes between kits suggests that transcript length may be a key factor in library production efficiency. These results provide a roadmap for labs on the strengths of each of these methods and how best to utilize them.

  13. Practical data collection : establishing methods and procedures for measuring water clarity and turbidity of storm water run-off from active major highway construction sites.

    Science.gov (United States)

    2014-09-12

    In anticipation of regulation involving numeric turbidity limit at highway construction sites, research was : done into the most appropriate, affordable methods for surface water monitoring. Measuring sediment : concentration in streams may be conduc...

  14. Construction of an environmental pollution map for some industrial sites using some bio-indicators

    International Nuclear Information System (INIS)

    Helalyel, M.A.M.

    2008-01-01

    The present work deals with an environmental pollution through determination of the heavy metal pollutants namely Cd,Co,Cu,Fe,Mn,Ni,Pb and Zn which are known to cause hazard to plants and animals in water, soil and plants at different sites in Helwan and El-Tibben as old industrial areas and Toshki as pre-industrial area. In addition to, study physico-parameters of water, major anions and major cations. The thesis is divided into four main chapters (introduction, experimental, results and discussion, and comparison between Toshki, Helwan and el-Tibben)in addition to summary and conclusion, references, abstract and arabic summary. The first chapter of the thesis comprises the general introduction, which gives introduction on the subject under investigation . Also contains a brief account on the environmental pollution of water, soil and plants in addition to the impact of industrial pollution in egypt , previous work on heavy metal pollutants then the characteristic of the investigated heavy metal pollutants and natural radioactivity for the soil of the investigated areas. The second chapter contains a description of selected areas, the methodology of sampling, sample preparation for water, soil and plant and method of analysis of the selected heavy metals. The third chapter involves the results and discussion . The results revealed physico-chemical parameters measured in water samples collected from investigated areas as temperature, ph, dissolved oxygen(DO), biochemical oxygen demand (BOD) , and total alkalinity as well as determination of the major anions and cations in water samples collected from investigated areas. Heavy metals determined in water, soil and plants in addition to natural radioactivity in soil samples for each of the studied industrial cities, Helwan, el-ti been and Toshki

  15. Bayesian optimization for constructing potential energy surfaces of polyatomic molecules with the smallest number of ab initio calculations

    Science.gov (United States)

    Vargas-Hernandez, Rodrigo A.; v Krems, Roman

    2017-04-01

    We examine the application of kernel methods of machine learning for constructing potential energy surfaces (PES) of polyatomic molecules. In particular, we illustrate the application of Bayesian optimization with Gaussian processes as an efficient method for sampling the configuration space of polyatomic molecules. Bayesian optimization relies on two key components: a prior over an objective function and a mechanism for sampling the configuration space. We use Gaussian processes to model the objective function and various acquisition functions commonly used in computer science to quantify the accuracy of sampling. The PES is obtained through an iterative process of adding ab initio points at the locations maximizing the acquisition function and re-trainig the Gaussian process with new points added. We sample different PESs with one or many acquisition functions and show how the acquisition functions affect the construction of the PESs.

  16. STRATÉGIES DE CONSTRUCTION D’UN DISCOURS POSITIF. LE CAS DES SITES WEB DES PRATICIENS DE L’ART DENTAIRE / STRATEGIES OF POSITIVE DISCOURSE CONSTRUCTION. THE CASE OF DENTAL ART PRACTICES WEBSITES

    Directory of Open Access Journals (Sweden)

    Andra-Teodora Porumb

    2017-03-01

    Full Text Available In most cases, before choosing a dentist and request an appointment, the patient gets informed from relatives, friends, and acquaintances. Nowadays he also has the opportunity to make the choice by consulting websites or Facebook pages of dentists. The trust is outlined prior to the meeting itself, before stepping into the cabinet. For good visibility, for attracting and retaining a greater number of patients, for an effective communication with patients as well as for gaining their trust, many dentists have decided to create their websites so as to present the cabinet and their services on the Internet. Moreover, their mere presence on the Internet gives authority and gives the impression of strong, well-prepared, modern and open personalities. If the speech they build manages to calm the fears and anxieties of the patient, if the tone is warm and close to the patient, if the site is attractive, not only informative, the patient will be convinced of the qualities and competence of the doctor and his team, of the fact that they will benefit of quality treatment in a pleasant and modern environment. We consulted numerous sites from different cultural environments – French, Italian and Romanian and, given the size of this paper, we presented the theme construction of the discourse in three of them, from the perspective of the French School of discourse analysis. In our view, the theme construction gives clues on how the organization shapes its identity, being a collective discursive construction. We examined what information was selected to be presented, the way they are organized and prioritized, the layout, titration, the text – photo / audio-visual documents relation. Each and every time we found the concern to provide information and explanations, the focus on some keywords (quality, accuracy, competence, experience, performance, innovation, the constant presence of the word “smile” in the discourse, an important number of images

  17. Bronsted acid site number evaluation using isopropylamine decomposition on Y-zeolite contaminated with vanadium in a simultaneous DSC-TGA analyzer

    International Nuclear Information System (INIS)

    Osorio Perez, Yonnathan; Forero, Liliam Alexandra Palomeque; Torres, Diana Vanessa Cristiano; Trujillo, Carlos Alexander

    2008-01-01

    Acid-site catalyzed decomposition of isopropylamine was followed in a simultaneous DSC-TGA analyzer. USY zeolite samples with and without vanadium were studied. Results show that acid sites number decreases linearly with vanadium concentration in zeolite indicating that vanadium neutralizes acid sites on catalyst and the metal is able to move on the surface of the solid. The neutralizing species probably contain only one vanadium atom. The reaction enthalpy plus desorption heat of the products show that vanadium preferentially neutralizes the strongest acid sites on the zeolite. The application of the simultaneous DSC-TGA technique to quantify Bronsted acid sites on solids by this reaction is novel

  18. Effect of duct shape, Mach number, and lining construction on measured suppressor attenuation and comparison with theory

    Science.gov (United States)

    Olsen, W. A.; Krejsa, E. A.; Coats, J. W.

    1972-01-01

    Noise attenuation was measured for several types of cylindrical suppressors that use a duct lining composed of honeycomb cells covered with a perforated plate. The experimental technique used gave attenuation data that were repeatable and free of noise floors and other sources of error. The suppressor length, the effective acoustic diameter, suppressor shape and flow velocity were varied. The agreement among the attenuation data and two widely used analytical models was generally satisfactory. Changes were also made in the construction of the acoustic lining to measure their effect on attenuation. One of these produced a very broadband muffler.

  19. Construction of a high-density genetic map for grape using next generation restriction-site associated DNA sequencing

    Directory of Open Access Journals (Sweden)

    Wang Nian

    2012-08-01

    Full Text Available Abstract Background Genetic mapping and QTL detection are powerful methodologies in plant improvement and breeding. Construction of a high-density and high-quality genetic map would be of great benefit in the production of superior grapes to meet human demand. High throughput and low cost of the recently developed next generation sequencing (NGS technology have resulted in its wide application in genome research. Sequencing restriction-site associated DNA (RAD might be an efficient strategy to simplify genotyping. Combining NGS with RAD has proven to be powerful for single nucleotide polymorphism (SNP marker development. Results An F1 population of 100 individual plants was developed. In-silico digestion-site prediction was used to select an appropriate restriction enzyme for construction of a RAD sequencing library. Next generation RAD sequencing was applied to genotype the F1 population and its parents. Applying a cluster strategy for SNP modulation, a total of 1,814 high-quality SNP markers were developed: 1,121 of these were mapped to the female genetic map, 759 to the male map, and 1,646 to the integrated map. A comparison of the genetic maps to the published Vitis vinifera genome revealed both conservation and variations. Conclusions The applicability of next generation RAD sequencing for genotyping a grape F1 population was demonstrated, leading to the successful development of a genetic map with high density and quality using our designed SNP markers. Detailed analysis revealed that this newly developed genetic map can be used for a variety of genome investigations, such as QTL detection, sequence assembly and genome comparison.

  20. Construction and operation of a tritium extraction facility at the Savannah River Site. Final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    DOE proposes to construct and operate a Tritium Extraction Facility (TEF) at H Area on the Savannah River Site (SRS) to provide the capability to extract tritium from commercial light water reactor (CLWR) targets and from targets of similar design. The proposed action is also DOE's preferred alternative. An action alternative is to construct and operate TEF at the Allied General Nuclear Services facility, which is adjacent to the eastern side of the SRS. Under the no-action alternative DOE could incorporate tritium extraction capabilities in the accelerator for production of tritium. This EIS is linked to the Final Programmatic Environmental Impact Statement for Tritium Supply and Recycling, from which DOE determined that it would produce tritium either in an accelerator or in a commercial light water reactor. The purpose of the proposed action and alternatives evaluated in this EIS is to provide tritium extraction capability to support either tritium production technology. The EIS assesses the environmental impacts from the proposed action and the alternatives, including the no action alternative

  1. Construction and expression of hepatitis B surface antigen escape variants within the "a" determinant by site directed mutagenesis.

    Science.gov (United States)

    Golsaz Shirazi, Forough; Amiri, Mohammad Mehdi; Mohammadi, Hamed; Bayat, Ali Ahmad; Roohi, Azam; Khoshnoodi, Jalal; Zarnani, Amir Hassan; Jeddi-Tehrani, Mahmood; Kardar, Gholam Ali; Shokri, Fazel

    2013-09-01

    The antibody response to hepatitis B surface antigen (HBsAg) controls hepatitis B virus infection. The "a" determinant of HBsAg is the most important target for protective antibody response, diagnosis and immunoprophylaxis. Mutations in this area may induce immune escape mutants and affect the performance of HBsAg assays. To construct clinically relevant recombinant mutant forms of HBsAg and assessment of their reactivity with anti-HBs monoclonal antibodies (MAbs). Wild type (wt) and mutant (mt) HBsAg genes were constructed by site directed mutagenesis and SEOing PCR. The amplified genes were inserted into pCMV6-neo plasmid and transfected in CHO cell line. The expression of wt- and mtHBsAg was assessed by commercial ELISA assays and stable cells were established and cloned by limiting dilution. The recombinant mutants were further characterized using a panel of anti-HBs monoclonal antibodies (MAbs) and the pattern of their reactivity was assessed by ELISA. Ten HBsAg mutants having single mutation within the "a" determinant including P120E, T123N, Q129H, M133L, K141E, P142S, D144A, G145R, N146S and C147S together with a wt form were successfully constructed and expressed in CHO cells. Reactivity of anti-HBs MAbs with mtHBsAgs displayed different patterns. The effect of mutations on antibody binding differed depending on the amino acid involved and its location within the ''a'' determinant. Mutation at amino acids 123 and 145 resulted in either complete loss or significant reduction of binding to all anti-HBs MAbs. Our panel of mtHBsAgs is a valuable tool for assessment of the antibody response to HBV escape mutants and may have substantial implications in HBV immunological diagnostics.

  2. Safety issues in construction of facilities for long-term storage of radioactive waste at vector site

    Energy Technology Data Exchange (ETDEWEB)

    Tokarevskyi, O.; Alekseeva, Z.; Kondratiev, S. [State Scientific and Technical Center for Nuclear and Radiation Safety, Kyiv (Ukraine); Rybalka, N. [State Nuclear Regulatory Inspectorate of Ukraine, Kyiv (Ukraine)

    2013-07-01

    In Ukraine, it is planned to create a number of near-surface facilities for disposal of short-lived RW and long-term (up to 100 years) storage of long-lived RW at the Vector site in the Chernobyl exclusion zone. The expected streams of long-lived RW are analyzed in the paper. According to the analysis of RW streams, in particular, issues are considered on development of RW acceptance criteria, admissible radiological impacts during preparation of RW for long-term storage, reliability of barriers (RW packages, modules and structures, etc.) during long-term storage of RW. (orig.)

  3. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY-1994 and FY-1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The Savannah River Ecology Laboratory initiated ecological studies related to the construction of the DWPF on the SRS in FY-1979. Two areas have been used for biological surveys and long-term monitoring: the DWPF construction site (S-Area and Z-Area), and two control sites (Rainbow Bay and Tinker Creek). The Rainbow Bay study area and S-Area are located within 5 km of each other on the SRS, and both once contained Carolina bays which were very similar ecologically. One goal of the SREL`s faunal studies is to compare the natural variation in amphibian populations at the Rainbow Bay control site to the variation observed at the human-altered site (Sun Bay, formerly on the DWPF construction site). Pre-construction biological surveys included data on vegetation, birds, mammals, amphibians, reptiles, fish and several invertebrate groups. No species on the Federal Endangered or Threatened lists were found on either site, but several plants and animals of threatened or special-concern status in South Carolina were present and the gopher frog (Rana areolata) currently is being considered for federal listing. Continuing studies are directed towards assessing construction impacts on the biota and towares modeling the effects of alteration of wetland hydroperiod on the biota. Primary emphasis is being paced on evaluation the effectiveness of mitigation measures undertaken by DOE.

  4. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Pwer Station

    International Nuclear Information System (INIS)

    Ueyama, Koreyasu

    1982-01-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported. (Wakatsuki, Y.)

  5. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Ueyama, Koreyasu [Tokyo Electric Power Co., Inc. (Japan)

    1982-09-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported.

  6. Radiation dose to construction workers at operating nuclear power plant sites. Volume 2. Appendices A--F. Final report, September 1975--September 1978

    International Nuclear Information System (INIS)

    Endres, G.W.R.; Shipler, D.B.

    1978-12-01

    These appendices contain the dosimetry procedures and details of the personnel and environmental dosimeters used for the Radiation Dose to Construction Workers at Operating Nuclear Power Plant Sites Study. A printout of the computer codes used to analyze dosimeter data is included along with all the raw data obtained. Appendices C through F contain computer output and log-normal plots of dosimetry data for environmental location and construction worker groups

  7. Changes in water quality of a small urban river triggered by deep drainage of a construction site

    Directory of Open Access Journals (Sweden)

    Bartnik Adam

    2016-12-01

    Full Text Available The paper presents the results of the monitoring of the selected physicochemical properties of the Jasień River waters (in Łódź, the third biggest city of Poland and their changes under the influence of drainage of a railway station Łódź Fabryczna construction site. Even 25 years ago the Jasień River was a receiver for the sewage from the Łódź textile factories. The drainage of the excavations and disposal of the water into the Jasień River was started on January 2014 and changed stable hydrological, physical and chemical regime of the river once again. In a consequence, average monthly flows exceeded the Jasień River flow in its upper section by six times, and at the beginning by even ten times. Chloride concentration was systematically growing over the study period. This growth and higher water pH were probably associated with increasing level of contaminants in the discharged water and its gradually decreasing uptake. Average annual water temperature increased and a decrease in its amplitude was observed. The annual conductivity and pH patterns became more uniform and the changes in pH followed a clear trend of monthly changes. Water turbidity increased by two times and during summer floods this parameter was often even a few times higher than before the drainage commenced. Chlorides improved water conductance and sodium and potassium increased basicity.

  8. Does Disposing of Construction and Demolition Debris in Unlined Landfills Impact Groundwater Quality? Evidence from 91 Landfill Sites in Florida.

    Science.gov (United States)

    Powell, Jon T; Jain, Pradeep; Smith, Justin; Townsend, Timothy G; Tolaymat, Thabet M

    2015-08-04

    More than 1,500 construction and demolition debris (CDD) landfills operate in the United States (U.S.), and U.S. federal regulations do not require containment features such as low-permeability liners and leachate collection systems for these facilities. Here we evaluate groundwater quality from samples collected in groundwater monitoring networks at 91 unlined, permitted CDD landfills in Florida, U.S. A total of 460,504 groundwater sample results were analyzed, with a median of 10 years of quarterly or semiannual monitoring data per site including more than 400 different chemical constituents. Downgradient concentrations of total dissolved solids, sulfate, chloride, iron, ammonia-nitrogen, and aluminum were greater than upgradient concentrations (p < 0.05). At downgradient wells where sulfate concentrations were greater than 150 mg/L (approximately 10% of the maximum dissolved sulfate concentration in water, which suggests the presence of leachate from the landfill), iron and arsenic were detected in 91% and 43% of samples, with median concentrations of 1,900 μg/L and 11 μg/L, respectively. These results show that although health-based standards can be exceeded at unlined CDD landfills, the magnitude of detected chemical concentrations is generally small and reflective of leached minerals from components (wood, concrete, and gypsum drywall) that comprise the bulk of discarded CDD by mass.

  9. Thermal calculations for the design, construction, operation, and evaluation of the Spent Fuel Test - Climax, Nevada Test Site

    International Nuclear Information System (INIS)

    Montan, D.N.; Patrick, W.C.

    1981-01-01

    The Spent Fuel Test-Climax (SFT-C) is a test of retrievable deep geologic storage of commercially generated spent nuclear reactor fuel in granitic rock. Eleven spent fuel assemblies, together with six electrical simulators and 20 guard heaters, are emplaced 420 m below the surface in the Climax granite at the US Department of Energy Nevada Test Site. On June 2, 1978 LLNL secured funding for the SFT-C, and completed spent fuel emplacement May 28, 1980. This report documents a series of thermal calculations that were performed in support of the SFT-C. Early calculations employed analytical solutions to address such design and construction issues as drift layout and emplacement hole spacings. Operational aspects of the test required more detailed numerical solutions dealing with ventilation and guard-heater power levels. The final set of calculations presented here provides temperature histories throughout the test facility for evaluation of the response of the SFT-C and for comparison of calculations with acquired data. This final set of calculations employs the as-built test geometry and best-available material properties

  10. Selecting, engineering and constructing drilling sites at the Geysers geothermal field. Geysers chinetsu ryoiki ni okeru kussaku shikichi no sentei engineering kochiku

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This paper describes some examples of selection, engineering and construction of drilling sites at the Geysers geothermal field in the northern district of California State. Steep landform, thin-layered soil and violent rainfall create unstable conditions bringing about numerous landslide in the field. Selection of a well drilling site appropriate in such conditions is started by analyzing the aerial photographs by technical staff. After site selection, prospecting and soil test are conducted and a working plan in the well site is decided to prepare engineering drawings. In the construction, land preparation, the open-cutting of base-line trench, etc. are carried out. The base-line trench is a large and sufficiently deep one which is open-cut to the front end or the middle of the bottom part of the well plateau. The final construction work is to build a leading casing for interpolating cementing. The well site construction in the Geysers geothermal field is done in consideration of protecting human life, health and properties. 1 fig.

  11. Construction on a new deep ice coring site at Dome Fuji Station -Operations carried out by the JARE-44 Dome Fuji overwintering team-

    Directory of Open Access Journals (Sweden)

    Takao Kameda

    2005-07-01

    Full Text Available Eight members of the 44th Japanese Antarctic Research Expedition (JARE-44 stayed at Dome Fuji Station (77°19′01″S, 39°42′11″E; 3810 m a.s.l.; ice thickness 3028±15 m; mean air temperature -54.4°C; lowest air temperature -79.7°C from January 19, 2003 to January 25, 2004 for glaciological, meteorological, and upper atmospheric observations, and for construction at a new ice coring site for deep ice coring. The construction was a continuation of the activities of JARE-43; JARE-44 primarily carried out interior work at the ice coring site. The following works were carried out during the overwintering period and are described in this paper: retrieval of casing pipes from the borehole, enlargement of the borehole, insertion of casing pipes into the borehole, movement of the winch system from the old to the new ice coring sites (44.5 m apart, floor construction, construction and preparation of a 10 m depth pit for the rotating mast, construction of stairs between the old and the new ice coring sites, construction of working tables, assembling the mast and the small goliath crane, setting up a lifter, testing the winch system, setting the winch for the chip collector, cable replacement for deep ice coring, assembling of a deep ice core drill, adjustment of a rotating mast, enlargement of caves for ice core storage, and general electrical work in the new ice coring site. The total working time for the above operations was 593.5 person-days. Since the average working time was 6 h/day, the total working time was 3561 person-hours. Preparations for borehole temperature measurements in a 2503 m borehole and the ice coring operation that was mainly conducted by the JARE-45 team are briefly described.

  12. Final site environmental statement: Blue Hills Station, Unit Nos. 1 and 2. Related to the determination of the suitability of Site G for eventual construction. Docket Nos. 50-510 and 50-511

    International Nuclear Information System (INIS)

    1978-07-01

    The site suitability analysis is based on the assumption that the Blue Hills Station will employ two pressurized water reactors to produce outputs of approximately 2814 MWt each. Two steam turbine generators will use the heat produced to provide approximately 957 MWe (gross) each. The exhaust steam will be cooled by four low-profile round mechanical-draft cooling towers. Assuming construction of a nuclear station at site G, a summary of environmental impacts and adverse effects is presented

  13. High and uneven levels of 45S rDNA site-number variation across wild populations of a diploid plant genus (Anacyclus, Asteraceae).

    Science.gov (United States)

    Rosato, Marcela; Álvarez, Inés; Nieto Feliner, Gonzalo; Rosselló, Josep A

    2017-01-01

    The nuclear genome harbours hundreds to several thousand copies of ribosomal DNA. Despite their essential role in cellular ribogenesis few studies have addressed intrapopulation, interpopulation and interspecific levels of rDNA variability in wild plants. Some studies have assessed the extent of rDNA variation at the sequence and copy-number level with large sampling in several species. However, comparable studies on rDNA site number variation in plants, assessed with extensive hierarchical sampling at several levels (individuals, populations, species) are lacking. In exploring the possible causes for ribosomal loci dynamism, we have used the diploid genus Anacyclus (Asteraceae) as a suitable system to examine the evolution of ribosomal loci. To this end, the number and chromosomal position of 45S rDNA sites have been determined in 196 individuals from 47 populations in all Anacyclus species using FISH. The 45S rDNA site-number has been assessed in a significant sample of seed plants, which usually exhibit rather consistent features, except for polyploid plants. In contrast, the level of rDNA site-number variation detected in Anacyclus is outstanding in the context of angiosperms particularly regarding populations of the same species. The number of 45S rDNA sites ranged from four to 11, accounting for 14 karyological ribosomal phenotypes. Our results are not even across species and geographical areas, and show that there is no clear association between the number of 45S rDNA loci and the life cycle in Anacyclus. A single rDNA phenotype was detected in several species, but a more complex pattern that included intra-specific and intra-population polymorphisms was recorded in A. homogamos, A. clavatus and A. valentinus, three weedy species showing large and overlapping distribution ranges. It is likely that part of the cytogenetic changes and inferred dynamism found in these species have been triggered by genomic rearrangements resulting from contemporary

  14. Wind tunnel tests of biodegradable fugitive dust suppressants being considered to reduce soil erosion by wind at radioactive waste construction sites

    International Nuclear Information System (INIS)

    Ligotke, M.W.; Dennis, G.W.; Bushaw, L.L.

    1993-10-01

    Wind tunnel tests were performed of three fugitive dust control agents derived from potato and sugar beet products. These materials are being considered for use as dust suppressants to reduce the potential for transport of radioactive materials by wind from radioactive waste construction and remediation sites. Soil and dust control agent type, solution concentrations, application quantities, aging (or drying) conditions, surface disturbance, and wind and saltating sand eolian erosive stresses were selected and controlled to simulate application and exposure of excavated soil surfaces in the field. A description of the tests, results, conclusions, and recommendations are presented in this report. The results of this study indicate that all three dust control agents can protect exposed soil surfaces from extreme eolian stresses. It is also clear that the interaction and performance of each agent with various soil types may differ dramatically. Thus, soils similar to that received from ML should be best protected by high concentration (∼2.5%) solutions of potato starch at low water application levels (∼1 to 2 L/m 2 ). Because the effectiveness of PS on this soil type is degraded after a moderate amount of simulated rainfall, other options or additives should be considered if surfaces are to be protected for long intervals or during periods of intermittent rainfall and hot, windy conditions. On the other hand, XDCA should be considered when excavating sandy soils. It should be noted, however, that because the Hanford soil test results are based on a small number of tests, it would be prudent to perform additional tests prior to selecting a fugitive dust control agent for use at the Hanford Site. While fermented potato waste was not the best fixative used on either soil, it did perform reasonably well on both soil types (better than XDCA on Idaho soil and better than PS on Hanford soil)

  15. Environmental Assessment for Leasing Land for the Siting, Construction and Operation of a Commercial AM Radio Antenna at Los Alamos National Laboratory, Los Alamos, NM

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-02-16

    The United States (U.S.) Department of Energy (DOE) proposes to lease approximately 3 acres of land at the Los Alamos National Laboratory (LANL) on the southeast tip of Technical Area (TA) 54 for the siting, construction and operation of an AM radio broadcasting antenna. This Environmental Assessment (EA) has been developed in order to assess the environmental effects of the Proposed Action and No Action alternative. The Proposed Action includes the lease of land for the siting, construction and operation of an AM radio broadcasting antenna in TA-54, just north of Pajarito Road and State Highway 4. The No Action Alternative was also considered. Under the No Action Alternative, DOE would not lease land on LANL property for the siting and operation of an AM radio broadcasting antenna; the DOE would not have a local station for emergency response use; and the land would continue to be covered in native vegetation and serve as a health and safety buffer zone for TA-54 waste management activities. Other potential sites on LANL property were evaluated but dismissed for reasons such as interference with sensitive laboratory experiments. Potential visual, health, and environmental effects are anticipated to be minimal for the Proposed Action. The radio broadcasting antenna would be visible against the skyline from some public areas, but would be consistent with other man-made objects in the vicinity that partially obstruct viewsheds (e.g. meteorological tower, power lines). Therefore, the net result would be a modest change of the existing view. Electromagnetic field (EMF) emissions from the antenna would be orders or magnitude less than permissible limits. The proposed antenna construction would not affect known cultural sites, but is located in close proximity to two archaeological sites. Construction would be monitored to ensure that the associated road and utility corridor would avoid cultural sites.

  16. Rock stability considerations for siting and constructing a KBS-3 repository. Based on experiences from Aespoe HRL, AECL's URL, tunnelling and mining

    Energy Technology Data Exchange (ETDEWEB)

    Martin, C.D. [Univ. of Alberta, Edmonton (Canada); Christiansson, Rolf [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden); Soederhaell, J. [VBB VIAK AB, Stockholm (Sweden)

    2001-12-01

    Over the past 25 years the international nuclear community has carried out extensive research into the deep geological disposal of nuclear waste in hard rocks. In two cases this research has resulted in the construction of dedicated underground research facilities: SKB's Aespoe Hard Rock Laboratory, Sweden and AECL's Underground Research Laboratory, Canada. Both laboratories are located in hard rocks considered representative of the Fennoscandian and Canadian Shields, respectively. This report is intended to synthesize the important rock mechanics findings from these research programs. In particular the application of these finding to assessing the stability of underground openings. As such the report draws heavily on the published results from the SKB's ZEDEX Experiment in Sweden and AECL's Mine- by Experiment in Canada. The objectives of this report are to: 1. Describe, using the current state of knowledge, the role rock engineering can play in siting and constructing a KBS-3 repository. 2. Define the key rock mechanics parameters that should be determined in order to facilitate repository siting and construction. 3. Discuss possible construction issues, linked to rock stability, that may arise during the excavation of the underground openings of a KBS-3 repository. 4. Form a reference document for the rock stability analysis that has to be carried out as a part of the design works parallel to the site investigations. While there is no unique or single rock mechanics property or condition that would render the performance of a nuclear waste repository unacceptable, certain conditions can be treated as negative factors. Outlined below are major rock mechanics issues that should be addressed during the siting, construction and closure of a nuclear waste repository in Sweden in hard crystalline rock. During the site investigations phase, rock mechanics information will be predominately gathered from examination and testing of the rock core and

  17. Rock stability considerations for siting and constructing a KBS-3 repository. Based on experiences from Aespoe HRL, AECL's URL, tunnelling and mining

    International Nuclear Information System (INIS)

    Martin, C.D.; Christiansson, Rolf; Soederhaell, J.

    2001-12-01

    Over the past 25 years the international nuclear community has carried out extensive research into the deep geological disposal of nuclear waste in hard rocks. In two cases this research has resulted in the construction of dedicated underground research facilities: SKB's Aespoe Hard Rock Laboratory, Sweden and AECL's Underground Research Laboratory, Canada. Both laboratories are located in hard rocks considered representative of the Fennoscandian and Canadian Shields, respectively. This report is intended to synthesize the important rock mechanics findings from these research programs. In particular the application of these finding to assessing the stability of underground openings. As such the report draws heavily on the published results from the SKB's ZEDEX Experiment in Sweden and AECL's Mine- by Experiment in Canada. The objectives of this report are to: 1. Describe, using the current state of knowledge, the role rock engineering can play in siting and constructing a KBS-3 repository. 2. Define the key rock mechanics parameters that should be determined in order to facilitate repository siting and construction. 3. Discuss possible construction issues, linked to rock stability, that may arise during the excavation of the underground openings of a KBS-3 repository. 4. Form a reference document for the rock stability analysis that has to be carried out as a part of the design works parallel to the site investigations. While there is no unique or single rock mechanics property or condition that would render the performance of a nuclear waste repository unacceptable, certain conditions can be treated as negative factors. Outlined below are major rock mechanics issues that should be addressed during the siting, construction and closure of a nuclear waste repository in Sweden in hard crystalline rock. During the site investigations phase, rock mechanics information will be predominately gathered from examination and testing of the rock core and mapping of the

  18. Lexicogrammar in the International Construction Industry: A Corpus-Based Case Study of Japanese-Hong-Kongese On-Site Interactions in English

    Science.gov (United States)

    Handford, Michael; Matous, Petr

    2011-01-01

    The purpose of this research is to identify and interpret statistically significant lexicogrammatical items that are used in on-site spoken communication in the international construction industry, initially through comparisons with reference corpora of everyday spoken and business language. Several data sources, including audio and video…

  19. Rational Design of High-Number dsDNA Fragments Based on Thermodynamics for the Construction of Full-Length Genes in a Single Reaction.

    Science.gov (United States)

    Birla, Bhagyashree S; Chou, Hui-Hsien

    2015-01-01

    Gene synthesis is frequently used in modern molecular biology research either to create novel genes or to obtain natural genes when the synthesis approach is more flexible and reliable than cloning. DNA chemical synthesis has limits on both its length and yield, thus full-length genes have to be hierarchically constructed from synthesized DNA fragments. Gibson Assembly and its derivatives are the simplest methods to assemble multiple double-stranded DNA fragments. Currently, up to 12 dsDNA fragments can be assembled at once with Gibson Assembly according to its vendor. In practice, the number of dsDNA fragments that can be assembled in a single reaction are much lower. We have developed a rational design method for gene construction that allows high-number dsDNA fragments to be assembled into full-length genes in a single reaction. Using this new design method and a modified version of the Gibson Assembly protocol, we have assembled 3 different genes from up to 45 dsDNA fragments at once. Our design method uses the thermodynamic analysis software Picky that identifies all unique junctions in a gene where consecutive DNA fragments are specifically made to connect to each other. Our novel method is generally applicable to most gene sequences, and can improve both the efficiency and cost of gene assembly.

  20. Rational Design of High-Number dsDNA Fragments Based on Thermodynamics for the Construction of Full-Length Genes in a Single Reaction.

    Directory of Open Access Journals (Sweden)

    Bhagyashree S Birla

    Full Text Available Gene synthesis is frequently used in modern molecular biology research either to create novel genes or to obtain natural genes when the synthesis approach is more flexible and reliable than cloning. DNA chemical synthesis has limits on both its length and yield, thus full-length genes have to be hierarchically constructed from synthesized DNA fragments. Gibson Assembly and its derivatives are the simplest methods to assemble multiple double-stranded DNA fragments. Currently, up to 12 dsDNA fragments can be assembled at once with Gibson Assembly according to its vendor. In practice, the number of dsDNA fragments that can be assembled in a single reaction are much lower. We have developed a rational design method for gene construction that allows high-number dsDNA fragments to be assembled into full-length genes in a single reaction. Using this new design method and a modified version of the Gibson Assembly protocol, we have assembled 3 different genes from up to 45 dsDNA fragments at once. Our design method uses the thermodynamic analysis software Picky that identifies all unique junctions in a gene where consecutive DNA fragments are specifically made to connect to each other. Our novel method is generally applicable to most gene sequences, and can improve both the efficiency and cost of gene assembly.

  1. Corrective action plan for CAU Number 339: Area 12 Fleet Operations, Steam Cleaning Discharge Area, Nevada Test Site

    International Nuclear Information System (INIS)

    1997-05-01

    The purpose of this Corrective Action Plan (CAP) is to provide the method for implementing the corrective action alternative as provided in the Corrective Action Decision Document (CADD). Detailed information of the site history and results of previous characterizations can be found in the Work Plan, the Preliminary Investigation Report, and the Phase 2 Characterization Report. Previous characterization investigations were completed as a condition of the Temporary Water Pollution Control Permit issued by the Nevada Division of Environmental Protection (NDEP) on July 14, 1992. The scope of this report is to prepare a CAP based upon the selected remedial alternative for closure of the Area 12, Building 12-16 Fleet Operations steam cleaning discharge area. The effluent discharge area has been impacted by volatile organic compounds (VOCs) and total petroleum hydrocarbons (TPH) as oil. The maximum hydrocarbon and VOC concentrations detected in the Preliminary and Phase 2 Site Characterization Investigations are summarized

  2. Evaluation of advanced gas chromatographs for on-site analysis. Final CRADA report for number Y-1295-0374

    Energy Technology Data Exchange (ETDEWEB)

    Wise, M.B.; Guerin, M.R.; Palausky, A.; Merriweather, R. [Lockheed Martin Energy Research, Oak Ridge, TN (United States); Forsberg, R.E. [Mine Safety Appliances-Baseline Industries, Lyons, CO (United States)

    1997-02-21

    The EKHO gas chromatography (GC) is being marketed by Mine Safety Appliances as an instrument for on-site environmental analysis and for process applications. This GC utilizes a unique bundled capillary column produced in Russia that provides very fast analysis and a wide linear dynamic range. Oak Ridge National Laboratory (ORNL) has been involved in a CRADA with Mine Safety Appliances in order to evaluate the analytical performance of the EKHO GC and is suitability for on-site environmental applications. Tests that were performed at ORNL included the analysis of air, water, and soil samples for aromatic hydrocarbons including benzene, toluene, xylene, and ethylbenzene (BTEX). These compounds were selected in order to simulate contamination by gasoline and other petroleum fuels. Performance factors that were studied included the instrument detection limits, the linearity, dynamic range, and precision for replicate samples. Other factors that were evaluated include the ease of set-up and operation.

  3. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  4. Consequences of least tern (Sternula antillarum) microhabitat nest-site selection on natural and mechanically constructed sandbars in the Missouri River

    Science.gov (United States)

    Stucker, Jennifer H.; Buhl, Deborah A.; Sherfy, Mark H.

    2013-01-01

    Nest-habitat selection in colonial species has rarely been assessed at multiple spatial scales to evaluate its fitness consequences. Management for the federally endangered U.S. Interior population of Least Terns (Sternula antillarum) has focused on maintenance of breeding habitats, including mechanical construction of sandbars from dredged material. Least Terns are attracted to large areas of unvegetated substrate, yet small-scale habitat features are thought to trigger selection for nesting. We evaluated nest-scale habitat selection to determine (1) whether selection differs between constructed and natural sandbars and (2) the subsequent consequences of habitat selection on nest success. During 2006–2008, we examined 869 Least Tern nest sites on constructed and natural sandbars in the Missouri River for evidence of microhabitat selection at the nest in relation to habitat within the surrounding 3-m area. Least Tern nest sites had coarser and larger substrate materials at the nest, more debris, and less vegetation than the surrounding area. Nests in constructed habitats had a greater percentage of coarse substrates and less vegetation or debris than nests in naturally created habitats. Apparent nest success was 1.8× greater on constructed than on natural sandbars. Nest success was best predicted by models with two spatial scales of predictors, including substrates (nest) and vegetation and debris (nest or surrounding area). Our results indicate that Least Terns select nest microhabitat characteristics that are associated with wind- and water-scoured habitats, and that nest success increases when these habitats are selected.

  5. Development of a test facility to evaluate the optimal design of BMPs for managing environmental problems at construction sites.

    Science.gov (United States)

    2012-06-01

    The following document is the final report for ALDOT Project 930655 which summarizes the design and : construction of the Auburn University Erosion and Sediment Control Testing Facility (AUESCTF) along : with several intermediatescale, f...

  6. Site characterization progress report: Yucca Mountain, Nevada, October 1, 1994--March 31, 1995, Number 12. Nuclear Waste Policy Act (Section 113)

    International Nuclear Information System (INIS)

    1995-08-01

    During the first half of fiscal year 1995, most activities at the Yucca Mountain Site Characterization Project were directed at implementing the Program Plan developed by the Office of Civilian Radioactive Waste Management. The Plan is designed to enable the Office to make measurable and significant progress toward key objectives over the next five years within the financial resources that can be realistically expected. Activities this period focused on the immediate goal of determining by 1998 whether Yucca Mountain, Nevada, is technically suitable as a possible site for a geologic repository for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Work on the Project advanced in several critical areas, including programmatic activities such as issuing the Program Plan, completing the first technical basis report to support the assessment of three 10 CFR 960 guidelines, developing the Notice of Intent for the Environmental Impact Statement, submitting the License Application Annotated Outline, and beginning a rebaselining effort to conform with the goals of the Program Plan. Scientific investigation and analysis of the site and design and construction activities to support the evaluation of the technical suitability of the site also advanced. Specific details relating to all Project activities and reports generated are presented in this report

  7. Site characterization progress report: Yucca Mountain, Nevada, October 1, 1994--March 31, 1995, Number 12. Nuclear Waste Policy Act (Section 113)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    During the first half of fiscal year 1995, most activities at the Yucca Mountain Site Characterization Project were directed at implementing the Program Plan developed by the Office of Civilian Radioactive Waste Management. The Plan is designed to enable the Office to make measurable and significant progress toward key objectives over the next five years within the financial resources that can be realistically expected. Activities this period focused on the immediate goal of determining by 1998 whether Yucca Mountain, Nevada, is technically suitable as a possible site for a geologic repository for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Work on the Project advanced in several critical areas, including programmatic activities such as issuing the Program Plan, completing the first technical basis report to support the assessment of three 10 CFR 960 guidelines, developing the Notice of Intent for the Environmental Impact Statement, submitting the License Application Annotated Outline, and beginning a rebaselining effort to conform with the goals of the Program Plan. Scientific investigation and analysis of the site and design and construction activities to support the evaluation of the technical suitability of the site also advanced. Specific details relating to all Project activities and reports generated are presented in this report.

  8. Dedicated Caravan Sites for French Gens du Voyage: Public Health Policy or Construction of Health and Environmental Inequalities?

    Science.gov (United States)

    Foisneau, Lise

    2017-12-01

    In France, gens du voyage ("people who travel" or "travellers") is a term used by the government to categorize various itinerant populations, the majority of which are diverse Romani groups. People categorized as gens du voyage are legally required to reside in particular locations called "dedicated caravan sites." Parliamentary debates about these dedicated caravan sites have clarified that one of the objectives of such sites is to help fulfill the gens du voyage 's right to health. However, there is a significant gap between the officially stated goals of such sites and the reality of life within them. This paper draws on research finding that the conditions in most dedicated caravan sites do not conform with the rights of gens du voyage to acceptable sanitary conditions and other underlying determinants of health.

  9. Conserved number of U2 snDNA sites in Piabina argentea, Piabarchus stramineus and two Bryconamericus species (Characidae, Stevardiinae

    Directory of Open Access Journals (Sweden)

    Diovani Piscor

    2018-03-01

    Full Text Available ABSTRACT The chromosomal location of 5S rRNA and U2 snRNA genes of Piabina argentea, Piabarchus stramineus and two Bryconamericus species from two different Brazilian river basins were investigated, in order to contribute to the understanding of evolutionary characteristics of these repetitive DNAs in the subfamily Stevardiinae. The diploid chromosome number was 2n = 52 for Bryconamericus cf. iheringii, Bryconamericus turiuba, Piabarchus stramineus and Piabina argentea. The 5S rDNA clusters were located on one chromosome pair in P. stramineus and B. cf. iheringii, and on two pairs in B. turiuba and P. argentea. The U2 snDNA clusters were located on the one pair in all species. Two-color FISH experiments showed that the co-localization between 5S rDNA and U2 snDNA in P. stramineus can represent a marker for this species. Thus, the present study demonstrated that the number of U2 snDNA clusters observed for the four species was conserved, but particular characteristics can be found in the genome of each species.

  10. Selecting an optimal number of binding site waters to improve virtual screening enrichments against the adenosine A2A receptor.

    Science.gov (United States)

    Lenselink, Eelke B; Beuming, Thijs; Sherman, Woody; van Vlijmen, Herman W T; IJzerman, Adriaan P

    2014-06-23

    A major challenge in structure-based virtual screening (VS) involves the treatment of explicit water molecules during docking in order to improve the enrichment of active compounds over decoys. Here we have investigated this in the context of the adenosine A2A receptor, where water molecules have previously been shown to be important for achieving high enrichment rates with docking, and where the positions of some binding site waters are known from a high-resolution crystal structure. The effect of these waters (both their presence and orientations) on VS enrichment was assessed using a carefully curated set of 299 high affinity A2A antagonists and 17,337 decoys. We show that including certain crystal waters greatly improves VS enrichment and that optimization of water hydrogen positions is needed in order to achieve the best results. We also show that waters derived from a molecular dynamics simulation - without any knowledge of crystallographic waters - can improve enrichments to a similar degree as the crystallographic waters, which makes this strategy applicable to structures without experimental knowledge of water positions. Finally, we used decision trees to select an ensemble of structures with different water molecule positions and orientations that outperforms any single structure with water molecules. The approach presented here is validated against independent test sets of A2A receptor antagonists and decoys from the literature. In general, this water optimization strategy could be applied to any target with waters-mediated protein-ligand interactions.

  11. A construction of Japanese consensus-formation model for the selection of last disposal site of high-level radioactive wastes

    International Nuclear Information System (INIS)

    Oki, Naotaka; Saigusa, Shin; Yonehara, Hidenori

    2010-01-01

    A group with Shizuoka University as the center one is promoting the investigation of the subject 'A construction of Japanese consensus - formation model for the selection of last disposal site of high-level radioactive wastes' adopted in 'Atomic Energy Fundamental Strategic Initiative' at the 20th fiscal year of Heisei, the Ministry of Education, Culture, Sports, Science and Technology. The result of this investigation is described here. (M.H.)

  12. Assessment of radiation impact on the environment components while preparing for construction site of centralized storage facility for spent nuclear fuel (CSSNF)

    International Nuclear Information System (INIS)

    Pavlovs'kij, L.Yi.; Gorodets'kij, D.V.; Syizov, A.O.; Kholodyuk, A.O.

    2016-01-01

    Predictive assessment of radiation impacts on the air environment, soil cover, staff, which is located in a residential area, staff of an adjacent to the CSSNF enterprises as a result of work to prepare the site for construction of CSSNF at the Chornobyl Exclusion Zone is presented. It is shown that radiation effects on components of the environment will not result in exceeding the reference levels of radiation safety

  13. Face, content, and construct validity of four, inanimate training exercises using the da Vinci ® Si surgical system configured with Single-Site ™ instrumentation.

    Science.gov (United States)

    Jarc, Anthony M; Curet, Myriam

    2015-08-01

    Validated training exercises are essential tools for surgeons as they develop technical skills to use robot-assisted minimally invasive surgical systems. The purpose of this study was to show face, content, and construct validity of four, inanimate training exercises using the da Vinci (®) Si surgical system configured with Single-Site (™) instrumentation. New (N = 21) and experienced (N = 6) surgeons participated in the study. New surgeons (11 Gynecology [GYN] and 10 General Surgery [GEN]) had not completed any da Vinci Single-Site cases but may have completed multiport cases using the da Vinci system. They participated in this study prior to attending a certification course focused on da Vinci Single-Site instrumentation. Experienced surgeons (5 GYN and 1 GEN) had completed at least 25 da Vinci Single-Site cases. The surgeons completed four inanimate training exercises and then rated them with a questionnaire. Raw metrics and overall normalized scores were computed using both video recordings and kinematic data collected from the surgical system. The experienced surgeons significantly outperformed new surgeons for many raw metrics and the overall normalized scores derived from video review (p da Vinci Single-Site surgery and actually testing the technical skills used during da Vinci Single-Site surgery. In summary, the four training exercises showed face, content, and construct validity. Improved overall scores could be developed using additional metrics not included in this study. The results suggest that the training exercises could be used in an overall training curriculum aimed at developing proficiency in technical skills for surgeons new to da Vinci Single-Site instrumentation.

  14. Environmental assessment for the resiting, construction, and operation of the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This environmental assessment (EA) presents estimated environmental impacts from the resiting, construction, and operation of the US Department of Energy`s (DOE`s) Environmental and Molecular Sciences Laboratory (EMSL), which is proposed to be constructed and operated on land near the south boundary of the Hanford Site near Richland, Washington. The EMSL, if constructed, would be a modern research facility in which experimental, theoretical, and computational techniques can be focused on environmental restoration problems, such as the chemical and transport behavior of complex mixtures of contaminants in the environment. The EMSL design includes approximately 18,500 square meters (200,000 square feet) of floor space on a 12-hectare (30-acre) site. The proposed new site is located within the city limits of Richland in north Richland, at the south end of DOE`s 300 Area, on land to be deeded to the US by the Battelle Memorial Institute. Approximately 200 persons are expected to be employed in the EMSL and approximately 60 visiting scientists may be working in the EMSL at any given time. State-of-the-art equipment is expected to be installed and used in the EMSL. Small amounts of hazardous substances (chemicals and radionuclides) are expected to be used in experimental work in the EMSL.

  15. Rethinking the Business Model in Construction by the Use of Off-Site System Deliverance: Case of the Shaft Project

    OpenAIRE

    Thuesen, Christian; Hvam, Lars

    2013-01-01

    This paper presents a set of insights to be used in the development of business models for off-site system deliveries contributing to the development of Off-Site Manufacturing practices (OSM). The theoretical offset for discussing the development of business models is the blue ocean strategy literature combined with theories on mass-customization and platform development identifying the optimization of cost and value through the handling of complexity as the central process. This framework is...

  16. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA): Revised Addition

    Science.gov (United States)

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  17. Constructing Narrative Ecologies as a Site for Teachers' Professional Learning with New Technologies and Media in Primary Education

    Science.gov (United States)

    Turvey, Keith

    2012-01-01

    This article argues that to understand how new technologies and media can become co-agents in the process of pedagogical change, we first need to understand teachers' complex relationship with new technologies and media in both their personal and their professional lives. A conceptual framework is delineated for constructing a complex narrative…

  18. Risk assessment of groundwater environmental contamination: a case study of a karst site for the construction of a fossil power plant.

    Science.gov (United States)

    Liu, Fuming; Yi, Shuping; Ma, Haiyi; Huang, Junyi; Tang, Yukun; Qin, Jianbo; Zhou, Wan-Huan

    2017-12-20

    This paper presents a demonstration of an integrated risk assessment and site investigation for groundwater contamination through a case study, in which the geologic and hydrogeological feature of the site and the blueprint of the fossil power plant (FPP) were closely analyzed. Predictions for groundwater contamination in case of accidents were performed by groundwater modeling system (GMS) and modular three-dimensional multispecies transport model (MT3DMS). Results indicate that the studied site area presents a semi-isolated hydrogeological unit with multiplicity in stratum lithology, the main aquifers at the site are consisted of the filled karst development layer with a thickness between 6.0 and 40.0 m. The poor permeability of the vadose zone at the FPP significantly restricted the infiltration of contaminants through the vadose zone to the subsurface. The limited influence of rarely isotropic porous karstified carbonate rocks on the groundwater flow system premised the simulate scenarios of plume migration. Analysis of the present groundwater chemistry manifested that that the groundwater at the site and the local area are of the HCO 3 -Ca, HCO 3 , and SO 4 -Ca types. A few of the water samples were contaminated by coliform bacteria and ammonia nitrogen as a result of the local cultivation. Prediction results indicate that the impact of normal construction and operation processes on the groundwater environment is negligible. However, groundwater may be partly contaminated within a certain period in the area of leakage from the diesel tanks, the industrial wastewater pool, and the cooling tower water tank in case of accidents. On a positive note, none of the plumes would reach the local sensitive areas for groundwater using. Finally, an anti-seepage scheme and a monitoring program are proposed to safeguard the groundwater protection. The integrated method of the site investigation and risk assessment used in this case study can facilitate the protection of

  19. Hydrogeological and geotechnical requirements for the construction of radioactive waste disposal sites with respect to the CONSOLID-system

    International Nuclear Information System (INIS)

    Giurgea, V.I.

    1999-01-01

    Within the scope of this dissertation, hydrogeological and geotechnical studies were carried out and critically analyzed for the estimation of the site applicability of a proposed low- and intermediate-level radioactive waste site (LILRW) at Cernavoda/Romania. The analysis, studies and modeling had to bring hints concerning the security of the final storage of the Cernovoda site, in accordance with the compliance of the severe recommendations of the IAEA-Vienna (International Atomic Energy Agency). A series of numerical model calculations were performed in completion of the 'in situ'- and laboratory-analyses. These calculations focused principally on the migration of the radionuclides through the base sealing and the geological strata. The results of the calculated models, including numerical simulation of the radionuclides migration, are leading to the conclusion, that even considering the worst possible suppositions and accidents, the groundwater in the deeper underground of the waste disposal site will not be reached by the radionuclides within the institutional control period of 300 years. These modeling results are to be considered the main focus of the thesis. The numerical 2D-simulation of the radionuclides migration through the unsaturated strata, represents a new contribution to the site assessment. The model includes unsaturated soil hydraulic properties determined by laboratory and 'in situ' measurements, as well as the radioactive decay and the ad- and absorbing properties of the geological formations. (orig.) [de

  20. Transportation infrastructure upgrades in the South: A compilation of state plans for construction near nuclear reactor sites

    International Nuclear Information System (INIS)

    1992-03-01

    There are currently 27 nuclear reactor sites located in the southern region. In many instances, the most practicable modes of transportation of spent nuclear fuel from these sites we through the use of highway and rail systems. These two transportation modes have important differences that affect their applicability; chief among these, perhaps, is the fact that while highway systems are publicly owned and maintained rail lines are owned by private entities. For this reason, track condition and maintenance, usage rates and other aspects of rail transport can vary widely. This report reviews southern state, department plans for infrastructure upgrades in the vicinity of nuclear reactor sites. This report includes a summary of planned modifications to bridges, access highways, and rail spurs (where applicable) over the next five years. The information contained herein was gathered from interviews with officials within state departments of transportation. With few exceptions, the contact person was an official within the departmental planning division

  1. Rethinking the Business Model in Construction by the Use of Off-Site System Deliverance: Case of the Shaft Project

    DEFF Research Database (Denmark)

    Thuesen, Christian; Hvam, Lars

    2013-01-01

    This paper presents a set of insights to be used in the development of business models for off-site system deliveries contributing to the development of Off-Site Manufacturing practices (OSM). The theoretical offset for discussing the development of business models is the blue ocean strategy...... of installation shafts. Findings from the development and production of the installation shaft show that system deliveries represent a promising strategy for moving from red ocean competitive environment with the predominant cost+ business model, to a blue ocean situation in which the competition emerges...... in the constant pursue of value creation and cost reduction. On the basis of that system deliverances represent a promising strategy in the future development and application of off-site manufacturing practices. The application of system deliveries is however demanding as it represents a fundamental shift...

  2. Integration of open metal sites and Lewis basic sites for construction of a Cu MOF with rare chiral Oh type of cage for high performance of methane purification

    KAUST Repository

    Shi, Zhan; Meng, Lingkun; Niu, Ziyuan; Liang, Chen; Dong, Xinglong; Liu, Kang; Li, Guanghua; Li, Chunguang; Han, Yu; Feng, Shouhua

    2018-01-01

    A Cu MOF [Cu4(PMTD)2(H2O)3]·20H2O, 1, (Where PMTD is (1,4-phenylenebis(5-methyl-4H-1,2,4-triazole-3,4-diyl)bis(5-carboxylato-3,1-phenylene)bis(hydroperoxymethanide) with rare chiral Oh type of cage and dual functionalities of open metal sites and Lewis basic sites based on a designed U-shaped ligand was synthesized by hydrothermal method. It exhibits high-capacity of CO2, C2 and C3 hydrocarbon storage capacity under atmospheric pressure as well as high H2 (1.96% wt) adsorption capacity at 77K. Methane purification capacity was tested and verified step by step. Isosteric heats (Qst) study reveals that CH4 has the weakest van der Waals host- guest interactions among the seven gases at 298K. Ideal adsorbed solution theory (IAST) calculation reveals that compound 1 is more selective toward CO2, C2H6 and C3H8 over CH4 in further calculating its separation capacity, as exemplified for CO2/CH4 (50:50, 5:95), C2H6/CH4 (50:50, 5:95) or C3H8/CH4 (50:50, 5:95) binary gas mixtures. Breakthrough experiments show that 1 has a significantly higher adsorption capacity for CO2, C2H6 and C3H8 than CH4. The selective adsorption properties of 1 make it a promising candidate for methane purification.

  3. Integration of open metal sites and Lewis basic sites for construction of a Cu MOF with rare chiral Oh type of cage for high performance of methane purification

    KAUST Repository

    Shi, Zhan

    2018-01-18

    A Cu MOF [Cu4(PMTD)2(H2O)3]·20H2O, 1, (Where PMTD is (1,4-phenylenebis(5-methyl-4H-1,2,4-triazole-3,4-diyl)bis(5-carboxylato-3,1-phenylene)bis(hydroperoxymethanide) with rare chiral Oh type of cage and dual functionalities of open metal sites and Lewis basic sites based on a designed U-shaped ligand was synthesized by hydrothermal method. It exhibits high-capacity of CO2, C2 and C3 hydrocarbon storage capacity under atmospheric pressure as well as high H2 (1.96% wt) adsorption capacity at 77K. Methane purification capacity was tested and verified step by step. Isosteric heats (Qst) study reveals that CH4 has the weakest van der Waals host- guest interactions among the seven gases at 298K. Ideal adsorbed solution theory (IAST) calculation reveals that compound 1 is more selective toward CO2, C2H6 and C3H8 over CH4 in further calculating its separation capacity, as exemplified for CO2/CH4 (50:50, 5:95), C2H6/CH4 (50:50, 5:95) or C3H8/CH4 (50:50, 5:95) binary gas mixtures. Breakthrough experiments show that 1 has a significantly higher adsorption capacity for CO2, C2H6 and C3H8 than CH4. The selective adsorption properties of 1 make it a promising candidate for methane purification.

  4. Projections of cost and on-site manual-labor requirements for constructing electric-generating plants, 1980-1990

    International Nuclear Information System (INIS)

    1982-02-01

    This report represents part of a continuing effort by the Federal Government to forecast the capital and labor required for constructing electric generating capacity additions necessary to accommodate projected economic and population growth in the US and its regions. Information is included on anticipated additions to electric generating capacity, labor requirements for these additions, capital cost requirements, and forecasting models. Coal-fired, nuclear, hydro, and pumped storage power plants are considered in these forecasts

  5. Derivation of the Crick-Wyman equation for allosteric proteins defining the difference between the number of binding sites and the Hill coefficient.

    Science.gov (United States)

    Poitevin, Frédéric; Edelstein, Stuart J

    2013-05-13

    In response to a 100-word footnote in the 1965 article by Monod, Wyman, and Changeux, a detailed manuscript signed by Francis Crick and Jeffries Wyman with 6000 words and 30 equations entitled "A Footnote on Allostery" circulated in 1965 among a limited group of scientists interested in allosteric interactions. This interesting and provocative document is published in this special issue for the first time. An intriguing equation in their text relates the difference between n (the number of ligand binding sites) and n' (the Hill coefficient) to the ratio of the saturation functions Y¯, for oligomers with n-1 and n binding sites. A compact derivation of this equation was not provided by Crick and Wyman, but one is presented here based on a definition of Y¯ involving the binding polynomial and its first derivative. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. Ecological Wisdom and Inspiration Underlying the Planning and Construction of Ancient Human Settlements: Case Study of Hongcun UNESCO World Heritage Site in China

    Directory of Open Access Journals (Sweden)

    Shanwen Zheng

    2018-04-01

    Full Text Available Human settlements are social-economic-natural complex ecosystems centered on human activities and the most prominent site for the contradictions between humans and the environment. Taking Hongcun, a UNESCO World Heritage site in China, as an example, this paper analyzes the methods and effect of coupling man and nature in Hongcun, summarizes the ecological wisdom of dealing with the relationship between human and nature, and uses this wisdom to shed light on the planning, construction, and management of contemporary urban and rural settlements. Firstly, the study introduces the Human-Natural Intergraded Ecological Planning (HNIEP model’s hypothesis, explaining its foundation and potential principles or approaches. Secondly, using the case study of Hongcun to explain, support, and validate the HNIEP model and its framework, the study found that the unique planning and construction of Hongcun has greatly promoted ecosystem services, such as local microclimate regulation, rainwater runoff regulation, water conservation, landscape aesthetic, and engagement with nature. Thirdly, Hongcun reflects the concept of harmonious coexistence between human and nature, the wisdom of rational use of ecosystem structures, processes and functions, and the wisdom of coupling human activities with the living environment and natural ecosystem. Finally, the paper summarizes the enlightenment brought by both the HNIEP model and Hongcun wisdom to contemporary urban-rural planning and construction management.

  7. Biological assessment of the effects of construction and operation of a depleted uranium hexafluoride conversion facility at the Portsmouth, Ohio,site

    International Nuclear Information System (INIS)

    Van Lonkhuyzen, R.

    2005-01-01

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF 6 ) Management Program evaluated alternatives for managing its inventory of DUF 6 and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF 6 PEIS) in April 1999 (DOE 1999). The DUF 6 inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF 6 PEIS, DOE stated its decision to promptly convert the DUF 6 inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF 6 conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF 6 cylinders stored at ETTP to the Portsmouth site for conversion. This biological assessment (BA) has been prepared by DOE, pursuant to the National Environmental Policy Act of 1969 and the Endangered Species Act of 1974, to evaluate potential impacts to federally listed species from the construction and operation of a conversion facility at the DOE Portsmouth site. The Indiana bat is known to occur in the area of the Portsmouth site and may potentially occur on the site during spring or summer. Evaluations of the Portsmouth site indicated that most of the site was found to have poor summer habitat for the Indiana bat because of the small size, isolation, and insufficient maturity of the few woodlands on the site. Potential summer habitat for the Indiana bat was identified outside the developed area bounded by Perimeter Road, within the corridors

  8. Site investigations, design, construction, operation, shutdown and surveillance of repositories for low- and intermediate-level radioactive wastes in rock cavities

    International Nuclear Information System (INIS)

    1984-01-01

    The report provides an overview and technical guidelines for considerations and for activities to be undertaken for safety assessment, site investigations, design, construction, operation, shutdown and surveillance of repositories for the disposal of low- and intermediate-level radioactive wastes in rock cavities. A generalized sequence of investigations is introduced which proceeds through region and site selection to the stage where the site is confirmed by detailed geoscientific investigations as being suitable for a waste repository. The different procedures and somewhat specific investigative needs with respect to existing mines are dealt with separately. General design, as well as specific requirements with respect to the different stages of design and construction, are dealt with. A review of activities related to the operational and post-operational stages of repositories in rock cavities is presented. The report describes in general terms the procedures related to different stages of disposal operation; also the conditions for shutdown together with essential shutdown and sealing activities and the related safety assessment requirements. Guidance is also given on the surveillance programme which will allow for inspection, testing, maintenance and security of a disposal facility during the operational phase, as well as for the post-operational stage for periods determined as necessary by the national authorities

  9. Variation of particle number size distributions and chemical compositions at the urban and downwind regional sites in the Pearl River Delta during summertime pollution episodes

    Science.gov (United States)

    Yue, D. L.; Hu, M.; Wu, Z. J.; Guo, S.; Wen, M. T.; Nowak, A.; Wehner, B.; Wiedensohler, A.; Takegawa, N.; Kondo, Y.; Wang, X. S.; Li, Y. P.; Zeng, L. M.; Zhang, Y. H.

    2010-10-01

    In order to characterize the features of particulate pollution in the Pearl River Delta (PRD) in the summer, continuous measurements of particle number size distributions and chemical compositions were simultaneously performed at Guangzhou urban site (GZ) and Back-garden downwind regional site (BG) in July 2006. Particle number concentration from 20 nm to 10 μm at BG was (1.7±0.8)×104 cm-3, about 40% lower than that at GZ, (2.9±1.1)×104 cm-3. The total particle volume concentration at BG was 94±34 μm3 cm-3, similar to that at GZ, 96±43 μm3 cm-3. More 20-100 nm particles, significantly affected by the traffic emissions, were observed at GZ, while 100-660 nm particle number concentrations were similar at both sites as they are more regional. PM2.5 values were similar at GZ (69±43 μg m-3) and BG (69±58 μg m-3) with R2 of 0.71 for the daily average PM2.5 at these two sites, indicating the fine particulate pollution in the PRD region to be regional. Two kinds of pollution episodes, the accumulation pollution episode and the regional transport pollution episode, were observed. Fine particles over 100 nm dominated both number and volume concentrations of total particles during the late periods of these pollution episodes. Accumulation and secondary transformation are the main reasons for the nighttime accumulation pollution episode. SO42-, NO3- accounted for about 60% in 100-660 nm particle mass and PM2.5 increase. When south or southeast wind prevailed in the PRD region, regional transport of pollutants took place. Regional transport contributed about 30% to fine particulate pollution at BG during a regional transport case. Secondary transformation played an important role during regional transport, causing higher increase rates of secondary ions in PM1.0 than other species and shifting the peaks of sulfate and ammonium mass size distributions to larger sizes. SO42-, NO3-, and NH4+ accounted for about 70% and 40% of PM1.0 and PM2.5, respectively.

  10. Environmental Assessment for Tower Construction at the Brandywine Communication Receiver Site, Prince George’s County, Maryland

    Science.gov (United States)

    2005-05-01

    Poecile atricapilla), northern cardinal (Cardinalis cardinalis), and eastern mockingbird (Mimus polyglottos). The Brandywine Site is in the...birds in poor weather conditions (e.g., low cloud ceiling, fog, rain, or poor visibility), and have caused massive bird kills when nocturnal...resources that the Service is authorized to protect. Take (i.e., killing ) of migratory birds by any person without authorization may constitute a

  11. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 2, Sections 1-6

    Energy Technology Data Exchange (ETDEWEB)

    1991-04-01

    This (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains the analysis of programmatic alternatives, project alternatives, affected environment of alternative sites, environmental consequences, and environmental regulations and permit requirements.

  12. Quality of life and probable psychological distress among male workers at a construction site, Kolar district, Karnataka, India.

    Science.gov (United States)

    Mathew, Geethu; Ramesh, Naveen; Shanbhag, Deepthi; Goud, Ramakrishna; Subramanian, Sharan; Lobo, Carol; Xavier, Alex; Dasari, Prudhvi

    2016-01-01

    The construction industry, which mainly consists of migrant labouers is one of the largest employers in the unorganized sector in India. These workers work in poor conditions and are often vulnerable to exploitation. These workers also do not have health care benefits and often these factors lead to poor quality of life (QOL) and psychological distress. To assess the QOL, probable psychological distress and associated factors among male construction workers. A cross-sectional study was conducted between September 2013 and November 2013 among 404 male workers. These construction workers were enrolled by consecutive sampling at a construction area in Kolar district, Kaarnataka, India. The study tools used were World Health Organization (WHO) QOL-BREF and 12-Item General Health Questionnaire (GHQ-12) to assess QOL and probable psychological distress, respectively. The transformed scores in WHO QOL-BREF in all four domains ranged 0-100. The four domain scores are scaled in a positive direction with higher scores indicating a higher QOL. Associations were done using statistical tests such as Chi-square, correlation, regression, independent samples t-test, and analysis of variance (ANOVA). A total of 404 male workers with a mean age of 25.6 ± 7.3 years were studied. Mean scores of various domains of QOL were 68.5 ± 13.7 (physical), 59.9 ± 13.5 (psychological), 64.3 ± 16.4 (social), and 44.1 ± 12.8 (environmental). On the self- rating scale, 59 (14.6%) workers were rated as having poor QOL. The prevalence of probable psychological distress was 27.5%. Factors such as increasing age, being currently married, and low educational status were found to be significantly associated (P psychological distress. There was a significant negative correlation (P psychological distress and a positive correlation between income and QOL. The QOL in the environmental domain, which mainly deals with living conditions, health, and recreational facilities was found to be poor and there

  13. The design and construction of large diameter pre-filter packed recovery wells at the Ninth Avenue Superfund Site

    International Nuclear Information System (INIS)

    Lombardo, S.L.; Maley, T.J.; Bono, B.A.

    1992-01-01

    Large diameter groundwater/oil recovery wells were installed in an unconfined sand aquifer at the Ninth Avenue Superfund Site in Gary, Indiana. To assure adequate filter packs, prefilter packed groundwater/oil recovery wells were selected to minimize silting by using appropriate screen slot size and filter pack. A properly sized filter pack was necessary to prevent the formation material from entering the well. During field drilling operations, open-quotes having sandsclose quotes and silting of existing wells were encountered. By using sieve analyses of the native aquifer soil, described by Driscoll (1989), the filter pack and screen slot size were selected. Prefilter packed well screens were selected for this site to assure the presence of a uniform filter pack, thus minimizing siltation in the wells. A prefilter packed well screen consists of a double screen with the interstitial space filled with granular filter pack material designed specifically for site conditions. These wells provide the adequate filter pack without the need to add additional filter pack material outside the well screen. Wells were installed using 12 1/4 inch ID hollow stem augers. This methodology is EPA-approved, expeditious, and inexpensive. Level B personal protective equipment was required during installation. Therefore, the advantages of hollow stem drilling include short drilling time and no circulation fluids. The 14 recovery wells were successfully installed in 14 days using the hollow stem auger drilling technique. Observations during well development revealed little or no silt present in purged groundwater

  14. AN INNOVATIVE APPROACH FOR CONSTRUCTING AN IN-SITU BARRIER FOR STRONTIUM-90 AT THE HANFORD SITE WASHINGTON

    Energy Technology Data Exchange (ETDEWEB)

    FABRE RJ

    2008-12-08

    Efforts to reduce the flux of Sr-90 to the Columbia River from Hanford Site 100-N Area past-practice liquid waste disposal sites have been underway since the early 1990s. Termination of all liquid discharges to the ground in 1993 was a major step toward meeting this goal. However, Sr-90 adsorbed on aquifer solids beneath liquid waste disposal sites and extending beneath the near-shore riverbed remains a continuing contaminant source to groundwater and the Columbia River. The initial pump-and-treat system proved to be ineffective as a long-term solution because of the geochemical characteristics of Sr-90. Following an evaluation of potential Sr-90 treatment technologies and their applicability under 100-NR-2 Operable Unit hydrogeologic conditions, the U.S. Department of Energy and the Washington State Department of Ecology agreed to evaluate apatite sequestration as the primary remedial technology, combined with a secondary polishing step utilizing phytoextraction if necessary. Aqueous injection was initiated in July 2005 to assess the efficacy of in-situ apatite along the 100 m of shoreline where Sr-90 concentrations are highest. The remedial technology is being developed by Pacific Northwest National Laboratory. CH2M Hill Plateau Remediation Company is implementing this technology in the field with support from PNNL.

  15. An Innovative Approach for Constructing an In-Situ Barrier for Strontium-90 at the Hanford Site, Washington - 9325

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, K. M.; Fabre, Russel J.; Vermeul, Vincent R.; Szecsody, James E.; Fellows, Robert J.; Williams, Mark D.; Fruchter, Jonathan S.

    2008-12-10

    Efforts to reduce the flux of Sr-90 to the Columbia River from Hanford Site 100-N Area past-practice liquid waste disposal sites have been underway since the early 1990s. Termination of all liquid discharges to the ground in 1993 was a major step toward meeting this goal. However, Sr 90 adsorbed on aquifer solids beneath liquid waste disposal sites and extending beneath the near-shore riverbed remains a continuing contaminant source to groundwater and the Columbia River. The initial pump-and treat system proved to be ineffective as a long-term solution because of the geochemical characteristics of Sr-90. Following an evaluation of potential Sr-90 treatment technologies and their applicability under 100 NR-2 Operable Unit hydrogeologic conditions, the U.S. Department of Energy and the Washington State Department of Ecology agreed to evaluate apatite sequestration as the primary remedial technology, combined with a secondary polishing step utilizing phytoextraction if necessary. Aqueous injection was initiated in July 2005 to assess the efficacy of in-situ apatite along the 100 m of shoreline where Sr-90 concentrations are highest. The remedial technology is being developed by Pacific Northwest National Laboratory. CH2M Hill Plateau Remediation Company is implementing this technology in the field with support from PNNL.

  16. Characterisation of Beaver Habitat Parameters That Promote the Use of Culverts as Dam Construction Sites: Can We Limit the Damage to Forest Roads?

    Directory of Open Access Journals (Sweden)

    Geneviève Tremblay

    2017-12-01

    Full Text Available The use of forest roads as foundations for dam construction by beavers is a recurrent problem in the management of forest road networks. In order to limit the damage to forest roads, our goal was to calculate the probability of beaver dam installation on culverts, according to surrounding habitat parameters, which could allow for improvement in the spatial design of new roads that minimise conflicts with beavers. Comparisons of culverts with (n = 77 and without (n = 51 dams in northwestern Quebec showed that catchment surface, cumulate length of all local streams within a 2-km radius, and road embankment height had a negative effect on the probability of dam construction on culverts, while flow level and culvert diameter ratio had a positive effect. Nevertheless, predicted probabilities of dam construction on culverts generally exceeded 50%, even on sites that were less favourable to beavers. We suggest that it would be more reasonable to take their probable subsequent presence into account at the earliest steps of road conception. Installing mitigation measures such as pre-dams during road construction would probably reduce the occurrence of conflicts with beavers and thus reduce the maintenance costs of forest roads.

  17. Supervision of radiation protection of miners at small construction sites of old mining; Aufsichtliche Ueberwachung zum Strahlenschutz von Bergleuten bei untertaegigen Bergsicherungsarbeiten im Altbergbau

    Energy Technology Data Exchange (ETDEWEB)

    Dehnert, J. [Saechsisches Landesamt fuer Umwelt, Landwirtschaft und Geologie (Germany). Referat Strahlenschutz

    2016-07-01

    More than 40 underground construction sites of old mining have been supervised by the radiation protection authority in Saxony in recent years. The paper deals with stories of underground supervisions to share the experiences with authorities and miners to improve the underground radiation protection. Supervision usually includes continuous measurements of radon activity concentrations. Some insufficient or failed radiation protection measures were found during the inspections. Instructions were given to improve the underground radiation protection immediately. A new Express- Air Screen-System (EAS) for miners was developed to shut off radon rich parts of galleries in some minutes only. The EAS will help to reduce the radon exposures of miners in the future.

  18. Environmental considerations associated with siting, constructing, and operating a special isotope separation plant at INEL: Volume 1, Proceedings: Report of public hearings

    International Nuclear Information System (INIS)

    1987-03-01

    This report documents the two public hearings conducted for the purpose of determining the scope of issues to be addressed in relation to the siting, constructing, and operating of a special isotope separation plant at INEL. The report includes transcripts of the public hearings held in Idaho Falls, Idaho, February 24, 1987, and in Boise, Idaho, February 26, 1987, and includes the exhibits of records relating to those hearings. The review and hearing process meets pertinent National Environmental Policy Act (NEPA) requirements, Council on Environmental Quality (CEQ) regulations, and DOE guidelines

  19. Environmental considerations associated with siting, constructing, and operating a special isotope separation plant at INEL: Volume 2, Proceedings: Report of public hearings

    International Nuclear Information System (INIS)

    1987-03-01

    This report documents the two public hearings conducted for the purpose of determining the scope of issues to be addressed in relation to the siting, constructing, and operating of a special isotope separation plant at INEL. The report includes transcripts of the public hearings held in Idaho Falls, Idaho, February 24, 1987, and in Boise, Idaho, February 26, 1987, and includes the exhibits of record relating to those hearings. The review and hearing process meets pertinent National Environmental Policy Act (NEPA) requirements, Council on Environmental Quality (CEQ) regulations, and DOE guidelines

  20. Design and construction of deinococcus radiodurans for biodegradation of organic toxins at radioactive DOE waste sites. 1998 annual progress report

    International Nuclear Information System (INIS)

    Daly, M.J.; Minton, K.W.; Wackett, L.P.

    1998-01-01

    'A 1992 survey of DOE waste sites indicates that about 32% of soils and 45% of groundwaters at these sites contain radionuclides and metals plus an organic toxin class. The most commonly reported combinations of these hazardous compounds being radionuclides and metals (e.g., U, Pu, Cs, Pb, Cr, As) plus chlorinated hydrocarbons (e.g., trichloroethylene), fuel hydrocarbons (e.g., toluene), or polychlorinated biphenyls (e.g., Arochlor 1248). These wastes are some of the most hazardous pollutants and pose an increasing risk to human health as they leach into the environment. The objective of this research is to develop novel organisms, that are highly resistant to radiation and the toxic effects of metals and radionuclides, for in-situ bioremediation of organic toxins. Few organisms exist that are able to remediate such environmental organic pollutants, and among those that can, the bacteria belonging to the genus Pseudomonas are the most characterized. Unfortunately, these bacteria are very radiation sensitive. For example, Pseudomonas spp. is even more sensitive than Escherichia coli and, thus, is not suitable as a bioremediation host in environments subjected to radiation. By contrast, D. radiodurans, a natural soil bacterium, is the most radiation resistant organism yet discovered; it is several thousand times more resistant to ionizing radiation than Pseudomonas. The sophisticated gene transfer and expression systems the authors have developed for D. radiodurans over the last eight years make this organism an ideal candidate for high-level expression of genes that degrade organic toxins, in radioactive environments. The authors ultimate aim is to develop organisms and approaches that will be useful for remediating the large variety of toxic organic compounds found in DOE waste sites that are too radioactive to support other bioremediation organisms. This report summarizes work after the first 6 months of a 3-year project.'

  1. [System construction of early warning for ecological security at cultural and natural heritage mixed sites and its application: a case study of Wuyishan Scenery District].

    Science.gov (United States)

    You, Wei-Bin; He, Dong-Jin; Qin, De-Hua; Ji, Zhi-Rong; Wu, Li-Yun; Yu, Jian-An; Chen, Bing-Rong; Tan, Yong

    2014-05-01

    This paper proposed a new concept of ecological security for protection by a comprehensive analysis of the contents and standards of world heritage sites. A frame concept model named "Pressure-State-Control" for early warning of ecological security at world heritage mixed sites was constructed and evaluation indicators of this frame were also selected. Wuyishan Scenery District was chosen for a case study, which has been severely disturbed by natural and artificial factors. Based on the frame model of "Pressure-State-Control" and by employing extension analysis, the matter-element model was established to assess the ecological security status of this cultural and natural world heritage mixed site. The results showed that the accuracy of ecological security early warning reached 84%. Early warning rank was I level (no alert status) in 1997 and 2009, but that in 2009 had a higher possibility to convert into II level. Likewise, the early-warning indices of sensitive ranks were different between 1997 and 2009. Population density, population growth rate, area index for tea garden, cultivated land owned per capita, level of drought, and investment for ecological and environmental construction were the main limiting factors to hinder the development of ecological security from 2009 to future. In general, the status of Wuyishan Scenery District ecological security was relatively good and considered as no alert level, while risk conditions also existed in terms of a few early-warning indicators. We still need to pay more attention to serious alert indicators and adopt effective prevention and control measures to maintain a good ecological security status of this heritage site.

  2. Biological assessment of the effects of construction and operation of a depleted uranium hexafluoride conversion facility at the Paducah, Kentucky, site.

    Energy Technology Data Exchange (ETDEWEB)

    Van Lonkhuyzen, R.

    2005-09-09

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF6 inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This biological assessment (BA) has been prepared by DOE, pursuant to the National Environmental Policy Act of 1969 (NEPA) and the Endangered Species Act of 1974, to evaluate potential impacts to federally listed species from the construction and operation of a conversion facility at the DOE Paducah site.

  3. Wetland assessment of the effects of construction and operation of a depleted uranium hexafluoride conversion facility at the Portsmouth, Ohio, site

    International Nuclear Information System (INIS)

    Van Lonkhuyzen, R.

    2005-01-01

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF 6 ) Management Program evaluated alternatives for managing its inventory of DUF 6 and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF 6 PEIS) in April 1999 (DOE 1999). The DUF 6 inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF 6 PEIS, DOE stated its decision to promptly convert the DUF 6 inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF 6 conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF 6 cylinders stored at ETTP to the Portsmouth site for conversion. This wetland assessment has been prepared by DOE, pursuant to Executive Order 11990 (''Protection of Wetlands'') and DOE regulations for implementing this Executive Order as set forth in Title 10, Part 1022, of the ''Code of Federal Regulations'' (10 CFR Part 1022 [Compliance with Floodplain and Wetland Environmental Review Requirements]), to evaluate potential impacts to wetlands from the construction and operation of a conversion facility at the DOE Portsmouth site. Approximately 0.02 acre (0.009 ha) of a 0.08-acre (0.03-ha) palustrine emergent wetland would likely be eliminated by direct placement of fill material during facility construction at Location A. Portions of this wetland that are not filled may be indirectly affected by an altered hydrologic regime because of the

  4. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 3, Sections 7-12, Appendices A-C

    Energy Technology Data Exchange (ETDEWEB)

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains references; a list of preparers and recipients; acronyms, abbreviations, and units of measure; a glossary; an index and three appendices.

  5. Construction of a high affinity zinc binding site in the metabotropic glutamate receptor mGluR1

    DEFF Research Database (Denmark)

    Jensen, Anders A.; Sheppard, P O; Jensen, L B

    2001-01-01

    a molecular model of the ATD of mGluR1 based on a weak amino acid sequence similarity with a bacterial periplasmic binding protein. The ATD consists of two globular lobes, which are speculated to contract from an "open" to a "closed" conformation following agonist binding. In the present study, we have...... created a Zn(2+) binding site in mGluR1b by mutating the residue Lys(260) to a histidine. Zinc acts as a noncompetitive antagonist of agonist-induced IP accumulation on the K260H mutant with an IC(50) value of 2 microm. Alanine mutations of three potential "zinc coligands" in proximity to the introduced...

  6. Comment of "Event-based soil loss models for construction sites" by Trenouth and Gharabaghi, J. Hydrol. doi: 10.1016/jhydrol.2015.03.010

    Science.gov (United States)

    Kinnell, P. I. A.

    2015-09-01

    Trenouth and Gharabaghi (2015) present two models which replace the EI30 index used as the event erosivity index in the USLE/RUSLE with ones that include runoff and values of EI30 to powers that differ for 1.0 as the event erosivity factor in modelling soil loss for construction sites. Their analysis on the application of these models focused on data from 5 locations as a whole but did not show how the models worked at each location. Practically, the ability to predict sediment yields at a specific location is more relevant than the capacity of a model to predict sediment yields globally. Also, the mathematical structure of their proposed models shows little regard to the physical processes involved in causing erosion and sediment yield. There is still the need to develop event-based empirical models for construction sites that are robust because they give proper consideration to the erosion process involved, and take account of the fact that sediment yield is usually determined from measurements of suspended load whereas soil loss at the scale for which the USLE/RUSLE model was developed includes both suspended load and bed load.

  7. Lead induces DNA damage and alteration of ALAD and antioxidant genes mRNA expression in construction site workers.

    Science.gov (United States)

    Akram, Zertashia; Riaz, Sadaf; Kayani, Mahmood Akhtar; Jahan, Sarwat; Ahmad, Malik Waqar; Ullah, Muhammad Abaid; Wazir, Hizbullah; Mahjabeen, Ishrat

    2018-01-16

    Oxidative stress and DNA damage are considered as possible mechanisms involved in lead toxicity. To test this hypothesis, DNA damage and expression variations of aminolevulinic acid dehydratase (ALAD), superoxide dismutase 2 (SOD2), and 8-oxoguanine DNA glycosylase 2a (OGG1-2a) genes was studied in a cohort of 100 exposed workers and 100 controls with comet assay and real-time polymerse chain reaction (PCR). Results indicated that increased number of comets was observed in exposed workers versus controls (p gene.

  8. Construction safety

    CERN Document Server

    Li, Rita Yi Man

    2013-01-01

    A close-to-ideal blend of suburb and city, speedy construction of towers of Babylon, the sparkling proportion of glass and steel buildings’ facade at night showcase the wisdom of humans. They also witness the footsteps, sweats and tears of architects and engineers. Unfortunately, these signatures of human civilizations are swathed in towering figures of construction accidents. Fretting about these on sites, different countries adopt different measures on sites. This book firstly sketches the construction accidents on sites, followed by a review on safety measures in some of the developing countries such as Bermuda, Egypt, Kuwait and China; as well as developed countries, for example, the United States, France and Singapore. It also highlights the enormous compensation costs with the courts’ experiences in the United Kingdom and Hong Kong.

  9. A CD with the wishes for the 21st century from thousands of readers of the science magazine "Newton", was buried at the Atlas construction site on 16.03.2000 (handling the CD: Giorgio Riviecco, Editor of "Newton")

    CERN Multimedia

    Laurent Guiraud

    2000-01-01

    A CD with the wishes for the 21st century from thousands of readers of the science magazine "Newton", was buried at the Atlas construction site on 16.03.2000 (handling the CD: Giorgio Riviecco, Editor of "Newton")

  10. Seasonal variation of atmospheric particle number concentrations, new particle formation and atmospheric oxidation capacity at the high Arctic site Villum Research Station, Station Nord

    Directory of Open Access Journals (Sweden)

    Q. T. Nguyen

    2016-09-01

    Full Text Available This work presents an analysis of the physical properties of sub-micrometer aerosol particles measured at the high Arctic site Villum Research Station, Station Nord (VRS, northeast Greenland, between July 2010 and February 2013. The study focuses on particle number concentrations, particle number size distributions and the occurrence of new particle formation (NPF events and their seasonality in the high Arctic, where observations and characterization of such aerosol particle properties and corresponding events are rare and understanding of related processes is lacking.A clear accumulation mode was observed during the darker months from October until mid-May, which became considerably more pronounced during the prominent Arctic haze months from March to mid-May. In contrast, nucleation- and Aitken-mode particles were predominantly observed during the summer months. Analysis of wind direction and wind speed indicated possible contributions of marine sources from the easterly side of the station to the observed summertime particle number concentrations, while southwesterly to westerly winds dominated during the darker months. NPF events lasting from hours to days were mostly observed from June until August, with fewer events observed during the months with less sunlight, i.e., March, April, September and October. The results tend to indicate that ozone (O3 might be weakly anti-correlated with particle number concentrations of the nucleation-mode range (10–30 nm in almost half of the NPF events, while no positive correlation was observed. Calculations of air mass back trajectories using the Hybrid Single Particle Lagrangian Integrated Trajectory (HYSPLIT model for the NPF event days suggested that the onset or interruption of events could possibly be explained by changes in air mass origin. A map of event occurrence probability was computed, indicating that southerly air masses from over the Greenland Sea were more likely linked to those

  11. Safety in numbers 7: Veni, vidi, duci: a grounded theory evaluation of nursing students' medication dosage calculation problem-solving schemata construction.

    Science.gov (United States)

    Weeks, Keith W; Higginson, Ray; Clochesy, John M; Coben, Diana

    2013-03-01

    This paper evaluates nursing students' transition through schemata construction and competence development in medication dosage calculation problem-solving (MDC-PS). We advance a grounded theory from interview data that reflects the experiences and perceptions of two groups of undergraduate pre-registration nursing students: eight students exposed to a prototype authentic MDC-PS environment and didactic transmission methods of education and 15 final year students exposed to the safeMedicate authentic MDC-PS environment. We advance a theory of how classroom-based 'chalk and talk' didactic transmission environments offered multiple barriers to accurate MDC-PS schemata construction among novice students. While conversely it was universally perceived by all students that authentic learning and assessment environments enabled MDC-PS schemata construction through facilitating: 'seeing' the authentic features of medication dosage problems; context-based and situational learning; learning within a scaffolded environment that supported construction of cognitive links between the concrete world of clinical MDC-PS and the abstract world of mathematics; and confidence-building in their cognitive and functional competence ability. Drawing on the principle of veni, vidi, duci (I came, I saw, I calculated), we combined the two sets of evaluations to offer a grounded theoretical basis for schemata construction and competence development within this critical domain of professional practice. Copyright © 2012 Elsevier Ltd. All rights reserved.

  12. An assessment of site suitability for marina construction in Istanbul, Turkey, using GIS and AHP multicriteria decision analysis.

    Science.gov (United States)

    Gumusay, Mustafa Umit; Koseoglu, Gokalp; Bakirman, Tolga

    2016-12-01

    Marinas play a key role in sea transportation and tourism. The problem of an insufficient marina capacity has revealed in terms of sea traffic due to the demographic structure and increasing tourism potential of Istanbul which is the biggest metropolitan city of Turkey and has around 600-km-long coastline. Therefore, the study area is mainly focused on the Marmara Sea shoreline of Istanbul. Rather than traditional methods, a rapid and cost-effective solution which considers natural and urban environment conditions is essential to satisfy the need for a marina site selection. Thanks to the latest improvements in geographic information systems, it is convenient to perform location selection analysis of marinas taking advantages of geology, land use, demography and accessibility data sets. The goal of this study is to define the areas that are appropriate for building marinas, with the use of topographic and demographic data in a present shoreline applying analytical hierarchy process multicriteria decision-making method. In this study, erosion, landslide, tsunami, land use, geologically hazardous areas, transfer lines, sea traffic data, neighbourhood scale population, age patterns and house income data have been used. Analytical hierarchy process method is used to give a weight to each data set, and a grading system has been developed for the area selection of marinas. The result maps of the analysis that show study area as classified into four categories from good to not suitable are presented. It is possible to create a decision support system for upper scale plans that enable authorities to perform analysis accurately, cost and time effectively using the proposed methodology that integrates multiple data sets with different scales and types.

  13. p-adic numbers

    OpenAIRE

    Grešak, Rozalija

    2015-01-01

    The field of real numbers is usually constructed using Dedekind cuts. In these thesis we focus on the construction of the field of real numbers using metric completion of rational numbers using Cauchy sequences. In a similar manner we construct the field of p-adic numbers, describe some of their basic and topological properties. We follow by a construction of complex p-adic numbers and we compare them with the ordinary complex numbers. We conclude the thesis by giving a motivation for the int...

  14. Construction completion report

    International Nuclear Information System (INIS)

    1990-01-01

    This Construction Completion Report documents the major construction projects at the Waste Isolation Pilot Plant (WIPP) site and related information on contracts, schedules, and other areas which affected construction. This report is not intended to be an exhaustive detailed analysis of construction, but is a general overview and summary of the WIPP construction. 10 refs., 29 figs

  15. Express-Air Screen-System to protect miners against radon exposures at small underground construction sites in old mining; Express-Wetterblenden-System zum Sofort-Schutz von Bergleuten vor Radonexpositionen bei untertaegigen Bergsicherungsarbeiten im Altbergbau

    Energy Technology Data Exchange (ETDEWEB)

    Dehnert, J. [Saechsisches Landesamt fuer Umwelt, Landwirtschaft und Geologie (Germany). Referat Strahlenschutz; Stopp, J. [Aluminiumbau und Verwaltungs GmbH Stopp, Schneeberg (Germany); Schoenherr, B. [Bergsicherung Schneeberg GmbH (Germany)

    2016-07-01

    A new Express-Air Screen-System (EAS) for miners was developed to reduce the radon exposures of miners at small construction sites of old mining. The EAS is a lightweight, modular and reusable construction kit of interlocking telescopic aluminum tubes, plastic foils and glue foam to shut off radon rich parts of galleries in some minutes only.

  16. Transcendental numbers

    CERN Document Server

    Murty, M Ram

    2014-01-01

    This book provides an introduction to the topic of transcendental numbers for upper-level undergraduate and graduate students. The text is constructed to support a full course on the subject, including descriptions of both relevant theorems and their applications. While the first part of the book focuses on introducing key concepts, the second part presents more complex material, including applications of Baker’s theorem, Schanuel’s conjecture, and Schneider’s theorem. These later chapters may be of interest to researchers interested in examining the relationship between transcendence and L-functions. Readers of this text should possess basic knowledge of complex analysis and elementary algebraic number theory.

  17. Construction of linkage maps in full-sib families of diploid outbreeding species by minimising the number of recombinations in hidden inheritance vectors

    NARCIS (Netherlands)

    Jansen, J.

    2005-01-01

    This article investigates the construction of linkage maps by means of the reconstruction of hidden inheritance vectors. An inheritance vector provides a description of the origin of marker alleles in an individual in terms of a binary code indicating the grandparental origin of the alleles. The

  18. Evaluating the number of stages in development of squamous cell and adenocarcinomas across cancer sites using human population-based cancer modeling.

    Directory of Open Access Journals (Sweden)

    Julia Kravchenko

    Full Text Available BACKGROUND: Adenocarcinomas (ACs and squamous cell carcinomas (SCCs differ by clinical and molecular characteristics. We evaluated the characteristics of carcinogenesis by modeling the age patterns of incidence rates of ACs and SCCs of various organs to test whether these characteristics differed between cancer subtypes. METHODOLOGY/PRINCIPAL FINDINGS: Histotype-specific incidence rates of 14 ACs and 12 SCCs from the SEER Registry (1973-2003 were analyzed by fitting several biologically motivated models to observed age patterns. A frailty model with the Weibull baseline was applied to each age pattern to provide the best fit for the majority of cancers. For each cancer, model parameters describing the underlying mechanisms of carcinogenesis including the number of stages occurring during an individual's life and leading to cancer (m-stages were estimated. For sensitivity analysis, the age-period-cohort model was incorporated into the carcinogenesis model to test the stability of the estimates. For the majority of studied cancers, the numbers of m-stages were similar within each group (i.e., AC and SCC. When cancers of the same organs were compared (i.e., lung, esophagus, and cervix uteri, the number of m-stages were more strongly associated with the AC/SCC subtype than with the organ: 9.79±0.09, 9.93±0.19 and 8.80±0.10 for lung, esophagus, and cervical ACs, compared to 11.41±0.10, 12.86±0.34 and 12.01±0.51 for SCCs of the respective organs (p<0.05 between subtypes. Most SCCs had more than ten m-stages while ACs had fewer than ten m-stages. The sensitivity analyses of the model parameters demonstrated the stability of the obtained estimates. CONCLUSIONS/SIGNIFICANCE: A model containing parameters capable of representing the number of stages of cancer development occurring during individual's life was applied to the large population data on incidence of ACs and SCCs. The model revealed that the number of m-stages differed by cancer subtype

  19. Evaluating the number of stages in development of squamous cell and adenocarcinomas across cancer sites using human population-based cancer modeling.

    Science.gov (United States)

    Kravchenko, Julia; Akushevich, Igor; Abernethy, Amy P; Lyerly, H Kim

    2012-01-01

    Adenocarcinomas (ACs) and squamous cell carcinomas (SCCs) differ by clinical and molecular characteristics. We evaluated the characteristics of carcinogenesis by modeling the age patterns of incidence rates of ACs and SCCs of various organs to test whether these characteristics differed between cancer subtypes. Histotype-specific incidence rates of 14 ACs and 12 SCCs from the SEER Registry (1973-2003) were analyzed by fitting several biologically motivated models to observed age patterns. A frailty model with the Weibull baseline was applied to each age pattern to provide the best fit for the majority of cancers. For each cancer, model parameters describing the underlying mechanisms of carcinogenesis including the number of stages occurring during an individual's life and leading to cancer (m-stages) were estimated. For sensitivity analysis, the age-period-cohort model was incorporated into the carcinogenesis model to test the stability of the estimates. For the majority of studied cancers, the numbers of m-stages were similar within each group (i.e., AC and SCC). When cancers of the same organs were compared (i.e., lung, esophagus, and cervix uteri), the number of m-stages were more strongly associated with the AC/SCC subtype than with the organ: 9.79±0.09, 9.93±0.19 and 8.80±0.10 for lung, esophagus, and cervical ACs, compared to 11.41±0.10, 12.86±0.34 and 12.01±0.51 for SCCs of the respective organs (p<0.05 between subtypes). Most SCCs had more than ten m-stages while ACs had fewer than ten m-stages. The sensitivity analyses of the model parameters demonstrated the stability of the obtained estimates. A model containing parameters capable of representing the number of stages of cancer development occurring during individual's life was applied to the large population data on incidence of ACs and SCCs. The model revealed that the number of m-stages differed by cancer subtype being more strongly associated with ACs/SCCs histotype than with organ/site.

  20. Transport of the first half of the CMS hadronic forward calorimeter (HF) from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France.

    CERN Multimedia

    Florelle Antoine

    2006-01-01

    The two halves of the Forward Hadronic Calorimeter (HF) were transported from the CERN Meyrin site to the surface assembly hall at LHC Point 5 in Cessy, France, during the first part of July. Transporting these 300 tonne objects involved the construction around them of a 65-metre long trailer, simultaneously pushed and pulled by two trucks at either end. The main road between St. Genis and Cessy was closed during these operations and a police escort was provided for the ~5 hour journeys. The two HF halves will be the first major elements to be lowered by the gantry crane into the underground experimental cavern around the end of July or beginning of August.

  1. Transport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France.

    CERN Multimedia

    Florelle Antoine

    2006-01-01

    The two halves of the Forward Hadronic Calorimeter (HF) were transported from the CERN Meyrin site to the surface assembly hall at LHC Point 5 in Cessy, France, during the first part of July. Transporting these 300 tonne objects involved the construction around them of a 65-metre long trailer, simultaneously pushed and pulled by two trucks at either end. The main road between St. Genis and Cessy was closed during these operations and a police escort was provided for the ~5 hour journeys. The two HF halves will be the first major elements to be lowered by the gantry crane into the underground experimental cavern around the end of July or beginning of August.

  2. Two-tier Haddon matrix approach to fault analysis of accidents and cybernetic search for relationship to effect operational control: a case study at a large construction site.

    Science.gov (United States)

    Mazumdar, Atmadeep; Sen, Krishna Nirmalya; Lahiri, Balendra Nath

    2007-01-01

    The Haddon matrix is a potential tool for recognizing hazards in any operating engineering system. This paper presents a case study of operational hazards at a large construction site. The fish bone structure helps to visualize and relate the chain of events, which led to the failure of the system. The two-tier Haddon matrix approach helps to analyze the problem and subsequently prescribes preventive steps. The cybernetic approach has been undertaken to establish the relationship among event variables and to identify the ones with most potential. Those event variables in this case study, based on the cybernetic concepts like control responsiveness and controllability salience, are (a) uncontrolled swing of sheet contributing to energy, (b) slippage of sheet from anchor, (c) restricted longitudinal and transverse swing or rotation about the suspension, (d) guilt or uncertainty of the crane driver, (e) safe working practices and environment.

  3. Aerosol number size distribution and new particle formation at a rural/coastal site in Pearl River Delta (PRD) of China

    Science.gov (United States)

    Liu, Shang; Hu, Min; Wu, Zhijun; Wehner, Birgit; Wiedensohler, Alfred; Cheng, Yafang

    Continuous measurements of aerosol number size distribution in the range of 3 nm-10 μm were performed in Pearl River Delta (PRD), China. These measurements were made during the period of 3 October to 5 November in 2004 at rural/coastal site, Xinken (22°37'N, 113°35'E, 6 m above sea level), in the south suburb of Guangzhou City (22°37'N, 113°35'E, 6 m above sea level), using a Twin Differential Mobility Particle Sizer (TDMPS) combined with an Aerodynamic Particle Sizer (APS). The aerosol particles at Xinken were divided into four groups according to the observation results: nucleation mode particles (3-30 nm), Aitken mode particles (30-130 nm), accumulation mode particles (130-1000 nm) and coarse mode particles (1-10 μm). Concentrations of nucleation mode, Aitken mode and accumulation mode particles were observed in the same order of magnitude (about 10,000 cm -3), among which the concentration of Aitken mode particle was the highest. The Aitken mode particles usually had two peaks: the morning peak may be caused by the land-sea circulation, which is proven to be important for transporting aged aerosols back to the sampling site, while the noon peak was ascribed to the condensational growth of new particles. New particle formation events were found on 7 days of 27 days, the new particle growth rates ranged from 2.2 to 19.8 nm h -1 and the formation rates ranged from 0.5 to 5.2 cm -3 s -1, both of them were in the range of typical observed formation rates (0.01-10 cm -3 s -1) and typical particle growth rates (1-20 nm h -1). The sustained growth of the new particles for several hours under steady northeast wind indicated that the new particle formation events may occur in a large homogeneous air mass.

  4. Report of drilling and radionuclide migration investigations at UE20n number-sign 1, Pahute Mesa, Nevada Test Site, 1987

    International Nuclear Information System (INIS)

    Erikson, S.J.

    1991-04-01

    Exploratory hole UE20n number-sign 1 was drilled 305 m down hydraulic gradient of the Cheshire event (U20n) as part of the Radionuclide Migration Program at the Nevada Test Site. The hole was designed to investigate the possibility of groundwater transport of radionuclides from the U20n cavity region. Drilling reached a total depth of 1005.8 m. Composite static water levels in the borehole were measured at approximately 620 m below ground surface. The borehole penetrated about 386 m of saturated zone, which was comprised primarily of rhyolite lava flows of the Upper Rhyolite Lavas, Tuffs, and Rhyolites of Area 20. Evidence from UE20n number-sign 1 suggests the presence of a relatively more permeable zone in the 730 to 750-m depth interval. The neutron log suggests that greater quantities of water were present at depths between 729 and 747 m. Core collected over three depth intervals showed the highest fracture density in a reddish-grey rhyolite lava flow in the 733.8 to 738.1-m core interval. Groundwater flow away from U20n through this permeable zone is suggested by the UE20n number-sign 1 borehole temperature logs. Elevated 3 H activities were observed with the highest activities found near 732 m. The 3 H activities observed in the 732 to 802-m interval in UE20n number-sign 1 were of similar magnitude to those found in the cavity region in the U20n post-shot hole. The activities of 125 Sb and 85 Kr, which are known to be mobile in groundwater, were of similar magnitude to those found near the cavity region, while 137 Cs, which is thought to be adsorbed during transport, was found in activities two to three orders of magnitude lower than near the cavity. These temperature and radioisotope data suggest that radionuclide migration via groundwater flow may be occurring laterally from the U20n rubble chimney through the permeable zone located at the 730 to 750-m depth. 25 refs., 18 figs., 15 tabs

  5. Funny Numbers

    Directory of Open Access Journals (Sweden)

    Theodore M. Porter

    2012-12-01

    Full Text Available The struggle over cure rate measures in nineteenth-century asylums provides an exemplary instance of how, when used for official assessments of institutions, these numbers become sites of contestation. The evasion of goals and corruption of measures tends to make these numbers “funny” in the sense of becoming dis-honest, while the mismatch between boring, technical appearances and cunning backstage manipulations supplies dark humor. The dangers are evident in recent efforts to decentralize the functions of governments and corporations using incen-tives based on quantified targets.

  6. Floodplain/wetland assessment of the effects of construction and operation ofa depleted uranium hexafluoride conversion facility at the Paducah, Kentucky,site.

    Energy Technology Data Exchange (ETDEWEB)

    Van Lonkhuyzen, R.

    2005-09-09

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF{sub 6} inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This floodplain/wetland assessment has been prepared by DOE, pursuant to Executive Order 11988 (''Floodplain Management''), Executive Order 11990 (Protection of Wetlands), and DOE regulations for implementing these Executive Orders as set forth in Title 10, Part 1022, of the ''Code of Federal Regulations'' (10 CFR Part 1022 [''Compliance with Floodplain and Wetland Environmental Review Requirements'']), to evaluate potential impacts to floodplains and wetlands from the construction and operation of a conversion facility at the DOE Paducah site. Reconstruction of the bridge crossing Bayou Creek would occur within the Bayou Creek 100-year

  7. Perspectives of construction robots

    Science.gov (United States)

    Stepanov, M. A.; Gridchin, A. M.

    2018-03-01

    This article is an overview of construction robots features, based on formulating the list of requirements for different types of construction robots in relation to different types of construction works.. It describes a variety of construction works and ways to construct new or to adapt existing robot designs for a construction process. Also, it shows the prospects of AI-controlled machines, implementation of automated control systems and networks on construction sites. In the end, different ways to develop and improve, including ecological aspect, the construction process through the wide robotization, creating of data communication networks and, in perspective, establishing of fully AI-controlled construction complex are formulated.

  8. Construction of a catalytically inactive cholesterol oxidase mutant: investigation of the interplay between active site-residues glutamate 361 and histidine 447.

    Science.gov (United States)

    Yin, Ye; Liu, Pingsheng; Anderson, Richard G W; Sampson, Nicole S

    2002-06-15

    Cholesterol oxidase catalyzes the oxidation of cholesterol to cholest-5-en-3-one and its subsequent isomerization into cholest-4-en-3-one. Two active-site residues, His447 and Glu361, are important for catalyzing the oxidation and isomerization reactions, respectively. Double-mutants were constructed to test the interplay between these residues in catalysis. We observed that the k(cat) of oxidation for the H447Q/E361Q mutant was 3-fold less than that for H447Q and that the k(cat) of oxidation for the H447E/E361Q mutant was 10-fold slower than that for H447E. Because both doubles-mutants do not have a carboxylate at position 361, they do not catalyze isomerization of the reaction intermediate cholest-5-en-3-one to cholest-4-en-3-one. These results suggest that Glu361 can compensate for the loss of histidine at position 447 by acting as a general base catalyst for oxidation of cholesterol. Importantly, the construction of the double-mutant H447E/E361Q yields an enzyme that is 31,000-fold slower than wild type in k(cat) for oxidation. The H447E/E361Q mutant is folded like native enzyme and still associates with model membranes. Thus, this mutant may be used to study the effects of membrane binding in the absence of catalytic activity. It is demonstrated that in assays with caveolae membrane fractions, the wild-type enzyme uncouples platelet-derived growth factor receptor beta (PDGFRbeta) autophosphorylation from tyrosine phosphorylation of neighboring proteins, and the H447E/E361Q mutant does not. Thus maintenance of membrane structure by cholesterol is important for PDGFRbeta-mediated signaling. The cholesterol oxidase mutant probe described will be generally useful for investigating the role of membrane structure in signal transduction pathways in addition to the PDGFRbeta-dependent pathway tested.

  9. Environmental Assessment for the construction and operation of the Three Rivers Solid Waste Authority regional waste management center at the Savannah River Site

    International Nuclear Information System (INIS)

    1995-12-01

    This Environmental Assessment (EA) has been prepared by the US Department of Energy (DOE) to assess the potential environmental impacts associated with the construction and operation of a landfill and technology center for regionally-generated municipal solid waste at the Savannah River Site (SRS) near Aiken, South Carolina. The facility would serve the municipal solid waste disposal needs for SRS and at least nine of the surrounding counties who currently comprise the Three Rivers Solid Waste Authority (TRSWA). Additional counties could become included in the proposed action at some future date. Current Federal and state requirements do not afford individual counties and municipalities within the region encompassing SRS the ability to efficiently or economically operate modern waste management facilities. In addition, consolidation of regional municipal solid waste at one location would have the benefit of reducing the duplicity of environmental consequences associated with the construction and operation of county-level facilities. The option to seek a combined disposal and technology development facility based on a regionally-cooperative effort was selected as a viable alternative to the existing individual SRS or county disposal activities. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended, the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Part 1021). NEPA requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described for impacts described herein, DOE will either publish a Finding of No Significant Impact or prepare an environmental impact statement (EIS)

  10. Effect of Number of Various-Type Acid Sites Located on 20 % Co/ZrO2 • SiO2 Sample Surface on Parameters of Catalytic Process in Synthesis of High-Octane Motor Fuel Components

    Directory of Open Access Journals (Sweden)

    A. P. Nesenchouk

    2011-01-01

    Full Text Available The paper considers an effect of ZrO2 content in 20%Co/xZrO2∙(100 – xSiO2 (x = 0, 10, 15, 25, 30, 40 and 100 mass percent catalyst carriers on their catalytic properties. Temperature programmed desorption of NH3 has made it possible to determine relations between their acid and catalytic properties. The paper reveals the TPD spectrum is the result of 4 overlapping peaks originating during NH3 desorption from the respective groups of acid sites. Total acidity of samples and contribution of separate acid site groups into the given acidity have been have been determined in the paper. The paper contains graphical dependences of a various-type acid site number on  content of zirconium oxide in the carrier. Correlations between change in various-type acid site number and catalytic process parameters (CO conversion, C5+ hydrocarbon output and  C5+ isoparaffin output have been found in the paper. The paper shows that the highest values of CO conversion and C5+ hydrocarbon output correspond to maximum number of acid sites, and that number accounts for a peak of desorbed ammonia at Tmax = 122 °C, while the lowest isoparaffin output corresponds to minimum number of acid sites, which characterizes a peak of desorbed ammonia at Tmax = 224–257 °C. 

  11. Construction dust amelioration techniques.

    Science.gov (United States)

    2012-04-01

    Dust produced on seasonal road construction sites in Alaska is both a traffic safety and environmental concern. Dust emanating from : unpaved road surfaces during construction severely reduces visibility and impacts stopping sight distance, and contr...

  12. Improving concrete overlay construction.

    Science.gov (United States)

    2010-03-01

    Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for : construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, ...

  13. Inhibition of colorectal cancer genomic copy number alterations and chromosomal fragile site tumor suppressor FHIT and WWOX deletions by DNA mismatch repair

    Science.gov (United States)

    Gelincik, Ozkan; Blecua, Pedro; Edelmann, Winfried; Kucherlapati, Raju; Zhou, Kathy; Jasin, Maria; Gümüş, Zeynep H.; Lipkin, Steven M.

    2017-01-01

    Homologous recombination (HR) enables precise DNA repair after DNA double strand breaks (DSBs) using identical sequence templates, whereas homeologous recombination (HeR) uses only partially homologous sequences. Homeologous recombination introduces mutations through gene conversion and genomic deletions through single-strand annealing (SSA). DNA mismatch repair (MMR) inhibits HeR, but the roles of mammalian MMR MutL homologues (MLH1, PMS2 and MLH3) proteins in HeR suppression are poorly characterized. Here, we demonstrate that mouse embryonic fibroblasts (MEFs) carrying Mlh1, Pms2, and Mlh3 mutations have higher HeR rates, by using 7,863 uniquely mapping paired direct repeat sequences (DRs) in the mouse genome as endogenous gene conversion and SSA reporters. Additionally, when DSBs are induced by gamma-radiation, Mlh1, Pms2 and Mlh3 mutant MEFs have higher DR copy number alterations (CNAs), including DR CNA hotspots previously identified in mouse MMR-deficient colorectal cancer (dMMR CRC). Analysis of The Cancer Genome Atlas CRC data revealed that dMMR CRCs have higher genome-wide DR HeR rates than MMR proficient CRCs, and that dMMR CRCs have deletion hotspots in tumor suppressors FHIT/WWOX at chromosomal fragile sites FRA3B and FRA16D (which have elevated DSB rates) flanked by paired homologous DRs and inverted repeats (IR). Overall, these data provide novel insights into the MMR-dependent HeR inhibition mechanism and its role in tumor suppression. PMID:29069730

  14. Contemporary evolution of resistance at the major insecticide target site gene Ace-1 by mutation and copy number variation in the malaria mosquito Anopheles gambiae

    Science.gov (United States)

    Weetman, David; Mitchell, Sara N; Wilding, Craig S; Birks, Daniel P; Yawson, Alexander E; Essandoh, John; Mawejje, Henry D; Djogbenou, Luc S; Steen, Keith; Rippon, Emily J; Clarkson, Christopher S; Field, Stuart G; Rigden, Daniel J; Donnelly, Martin J

    2015-01-01

    Functionally constrained genes are ideal insecticide targets because disruption is often fatal, and resistance mutations are typically costly. Synaptic acetylcholinesterase (AChE) is an essential neurotransmission enzyme targeted by insecticides used increasingly in malaria control. In Anopheles and Culex mosquitoes, a glycine–serine substitution at codon 119 of the Ace-1 gene confers both resistance and fitness costs, especially for 119S/S homozygotes. G119S in Anopheles gambiae from Accra (Ghana) is strongly associated with resistance, and, despite expectations of cost, resistant 119S alleles are increasing significantly in frequency. Sequencing of Accra females detected only a single Ace-1 119S haplotype, whereas 119G diversity was high overall but very low at non-synonymous sites, evidence of strong purifying selection driven by functional constraint. Flanking microsatellites showed reduced diversity, elevated linkage disequilibrium and high differentiation of 119S, relative to 119G homozygotes across up to two megabases of the genome. Yet these signals of selection were inconsistent and sometimes weak tens of kilobases from Ace-1. This unexpected finding is attributable to apparently ubiquitous amplification of 119S alleles as part of a large copy number variant (CNV) far exceeding the size of the Ace-1 gene, whereas 119G alleles were unduplicated. Ace-1 CNV was detectable in archived samples collected when the 119S allele was rare in Ghana. Multicopy amplification of resistant alleles has not been observed previously and is likely to underpin the recent increase in 119S frequency. The large CNV compromised localization of the strong selective sweep around Ace-1, emphasizing the need to integrate CNV analysis into genome scans for selection. PMID:25865270

  15. Contemporary evolution of resistance at the major insecticide target site gene Ace-1 by mutation and copy number variation in the malaria mosquito Anopheles gambiae.

    Science.gov (United States)

    Weetman, David; Mitchell, Sara N; Wilding, Craig S; Birks, Daniel P; Yawson, Alexander E; Essandoh, John; Mawejje, Henry D; Djogbenou, Luc S; Steen, Keith; Rippon, Emily J; Clarkson, Christopher S; Field, Stuart G; Rigden, Daniel J; Donnelly, Martin J

    2015-06-01

    Functionally constrained genes are ideal insecticide targets because disruption is often fatal, and resistance mutations are typically costly. Synaptic acetylcholinesterase (AChE) is an essential neurotransmission enzyme targeted by insecticides used increasingly in malaria control. In Anopheles and Culex mosquitoes, a glycine-serine substitution at codon 119 of the Ace-1 gene confers both resistance and fitness costs, especially for 119S/S homozygotes. G119S in Anopheles gambiae from Accra (Ghana) is strongly associated with resistance, and, despite expectations of cost, resistant 119S alleles are increasing significantly in frequency. Sequencing of Accra females detected only a single Ace-1 119S haplotype, whereas 119G diversity was high overall but very low at non-synonymous sites, evidence of strong purifying selection driven by functional constraint. Flanking microsatellites showed reduced diversity, elevated linkage disequilibrium and high differentiation of 119S, relative to 119G homozygotes across up to two megabases of the genome. Yet these signals of selection were inconsistent and sometimes weak tens of kilobases from Ace-1. This unexpected finding is attributable to apparently ubiquitous amplification of 119S alleles as part of a large copy number variant (CNV) far exceeding the size of the Ace-1 gene, whereas 119G alleles were unduplicated. Ace-1 CNV was detectable in archived samples collected when the 119S allele was rare in Ghana. Multicopy amplification of resistant alleles has not been observed previously and is likely to underpin the recent increase in 119S frequency. The large CNV compromised localization of the strong selective sweep around Ace-1, emphasizing the need to integrate CNV analysis into genome scans for selection. © 2015 The Authors. Molecular Ecology published by John Wiley & Sons Ltd.

  16. Site development

    International Nuclear Information System (INIS)

    Noack, J.

    1975-01-01

    The subject of this paper is a general view over all necessary considerations to develop the site after it has been chosen and before starting with the construction of a nuclear power plant. (orig./RW) [de

  17. Authorized Limits for the Release of a 25 Ton Locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly Facility, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Gwin, Jeremy; Frenette, Douglas

    2010-01-01

    This document contains process knowledge and radiological data and analysis to support approval for release of the 25-ton locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly (EMAD) Facility, located on the Nevada Test Site (NTS). The 25-ton locomotive is a small, one-of-a-kind locomotive used to move railcars in support of the Nuclear Engine for Rocket Vehicle Application project. This locomotive was identified as having significant historical value by the Nevada State Railroad Museum in Boulder City, Nevada, where it will be used as a display piece. A substantial effort to characterize the radiological conditions of the locomotive was undertaken by the NTS Management and Operations Contractor, National Security Technologies, LLC (NSTec). During this characterization process, seven small areas on the locomotive had contamination levels that exceeded the NTS release criteria (limits consistent with U.S. Department of Energy (DOE) Order DOE O 5400.5, 'Radiation Protection of the Public and the Environment'). The decision was made to perform radiological decontamination of these known accessible impacted areas to further the release process. On February 9, 2010, NSTec personnel completed decontamination of these seven areas to within the NTS release criteria. Although all accessible areas of the locomotive had been successfully decontaminated to within NTS release criteria, it was plausible that inaccessible areas of the locomotive (i.e., those areas on the locomotive where it was not possible to perform radiological surveys) could potentially have contamination above unrestricted release limits. To access the majority of these inaccessible areas, the locomotive would have to be disassembled. A complete disassembly for a full radiological survey could have permanently destroyed parts and would have ruined the historical value of the locomotive. Complete disassembly would also add an unreasonable financial burden for the

  18. Construction of a system using a deep learning algorithm to count cell numbers in nanoliter wells for viable single-cell experiments.

    Science.gov (United States)

    Kamatani, Takashi; Fukunaga, Koichi; Miyata, Kaede; Shirasaki, Yoshitaka; Tanaka, Junji; Baba, Rie; Matsusaka, Masako; Kamatani, Naoyuki; Moro, Kazuyo; Betsuyaku, Tomoko; Uemura, Sotaro

    2017-12-04

    For single-cell experiments, it is important to accurately count the number of viable cells in a nanoliter well. We used a deep learning-based convolutional neural network (CNN) on a large amount of digital data obtained as microscopic images. The training set consisted of 103 019 samples, each representing a microscopic grayscale image. After extensive training, the CNN was able to classify the samples into four categories, i.e., 0, 1, 2, and more than 2 cells per well, with an accuracy of 98.3% when compared to determination by two trained technicians. By analyzing the samples for which judgments were discordant, we found that the judgment by technicians was relatively correct although cell counting was often difficult by the images of discordant samples. Based on the results, the system was further enhanced by introducing a new algorithm in which the highest outputs from CNN were used, increasing the accuracy to higher than 99%. Our system was able to classify the data even from wells with a different shape. No other tested machine learning algorithm showed a performance higher than that of our system. The presented CNN system is expected to be useful for various single-cell experiments, and for high-throughput and high-content screening.

  19. Progress report on the scientific investigation program for the Nevada Yucca Mountain Site, October 1, 1991--March 31, 1992, Number 6

    International Nuclear Information System (INIS)

    1992-09-01

    In accordance with the requirements of section 113(b)(3) of the Nuclear Waste Policy Act (NWPA) and 10 CFR 60.18(g), the US Department of Energy (DOE) has prepared this report on the progress of site characterization activities at Yucca Mountain, Nevada, for the period October 1, 1991, through March 31, 1992. This report is the sixth in a series of reports that are issued at intervals of approximately six months during site characterization. Also included in this report are activities such as public outreach and international programs that are not officially part of site characterization. Information on these activities is provided in order to fully integrate all aspects of the Yucca Mountain studies

  20. Safety in construction industry

    International Nuclear Information System (INIS)

    Khan, A.M.

    1979-01-01

    Causative factors of accidents in construction industry in the context of experience of construction work of the Rajasthan Atomic Power Project are enumerated. The aspect of accident cost - direct and indirect - is discussed briefly. Setting up of a safety set-up at construction sites is emphasized and principles which should guide the accident prevention programme are spelt out. (M.G.B.)

  1. An Expert System Applied in Construction Water Quality Monitoring

    OpenAIRE

    Leila Ooshaksaraie; Noor E.A. Basri

    2011-01-01

    Problem statement: An untoward environmental impact of urban growth in Malaysia has been deterioration in a number of watercourses due to severe siltation and other pollutants from the construction site. Water quality monitoring is a plan for decision makers to take into account the adverse impacts of construction activities on the receiving water bodies. It is also a process for collecting the construction water quality monitoring, baseline data and standard level. Approa...

  2. Some constructive bounds on Ramsey numbers

    Czech Academy of Sciences Publication Activity Database

    Kostochka, A.; Pudlák, Pavel; Rodl, V.

    2010-01-01

    Roč. 100, č. 5 (2010), s. 439-445 ISSN 0095-8956 Institutional research plan: CEZ:AV0Z10190503 Keywords : Norm-graphs Subject RIV: BA - General Mathematics Impact factor: 1.043, year: 2010 http://www.sciencedirect.com/science/article/pii/S0095895610000043

  3. Safety in construction industry - overview

    International Nuclear Information System (INIS)

    Chockalingam, S.; Nehru, R.M.; Ramprasad, K.; Sonawane, A.U.

    2016-01-01

    The construction industry plays an important role in the social and economic development in a country. Safety in the construction industry is considered a major issue in developed and developing countries. In urban sector of India increasing numbers of workers have taken up construction work as a means of immediate employment, which provides cash earnings at the end of the day. Being as unorganized sector, the fatal injuries in DAE unit for the construction industry (Nuclear Power Project including BHAVINI: 62.7% from 1999 to 2014) is higher than the category for all other units (UCIL:13.3%; ECIL:6.7%; NFC and ZC: 4%; HWP: 2.7%; IREL:2.7%; Nuclear Power Plant: 2.7% etc., from 1999 to 2014). A variety hazards exist in the construction site. The best way to protect workers against workers against hazards is to control problems at the source. The problem regarding construction industry is not that the hazards and risks are unknown, but it very difficult to accurately identify in a constantly changing work environment. To prevent hazards at work, all possible hazards that may be encountered should be identified in advance through Job Hazard Analysis (JHA). The present scenario has deduced a fact that efficient Safety Management Techniques (SMT) are (essential for today's construction companies and adaptation of legal requirements including regulatory requirements and proactive safety management techniques will help organizations in providing a better workplace to its employees and reduce the accidents. (author)

  4. Site investigation SFR. Rock type coding, overview geological mapping and identification of rock units and possible deformation zones in drill cores from the construction of SFR

    Energy Technology Data Exchange (ETDEWEB)

    Petersson, Jesper (Vattenfall Power Consultant AB, Stockholm (Sweden)); Curtis, Philip; Bockgaard, Niclas (Golder Associates AB (Sweden)); Mattsson, Haakan (GeoVista AB, Luleaa (Sweden))

    2011-01-15

    This report presents the rock type coding, overview lithological mapping and identification of rock units and possible deformation zones in drill cores from 32 boreholes associated with the construction of SFR. This work can be seen as complementary to single-hole interpretations of other older SFR boreholes earlier reported in /Petersson and Andersson 2010/: KFR04, KFR08, KFR09, KFR13, KFR35, KFR36, KFR54, KFR55, KFR7A, KFR7B and KFR7C. Due to deficiencies in the available material, the necessary activities have deviated somewhat from the established methodologies used during the recent Forsmark site investigations for the final repository for spent nuclear fuel. The aim of the current work has been, wherever possible, to allow the incorporation of all relevant material from older boreholes in the ongoing SFR geological modelling work in spite of the deficiencies. The activities include: - Rock type coding of the original geological mapping according to the nomenclature used during the preceding Forsmark site investigation. As part of the Forsmark site investigation such rock type coding has already been performed on most of the old SFR boreholes if the original geological mapping results were available. This earlier work has been complemented by rock type coding on two further boreholes: KFR01 and KFR02. - Lithological overview mapping, including documentation of (1) rock types, (2) ductile and brittle-ductile deformation and (3) alteration for drill cores from eleven of the boreholes for which no original geological borehole mapping was available (KFR31, KFR32, KFR34, KFR37,KFR38, KFR51, KFR69, KFR70, KFR71, KFR72 and KFR89). - Identification of possible deformation zones and merging of similar rock types into rock units. This follows SKB's established criteria and methodology of the geological Single-hole interpretation (SHI) process wherever possible. Deviations from the standard SHI process are associated with the lack of data, for example BIPS images

  5. Site investigation SFR. Rock type coding, overview geological mapping and identification of rock units and possible deformation zones in drill cores from the construction of SFR

    International Nuclear Information System (INIS)

    Petersson, Jesper; Curtis, Philip; Bockgaard, Niclas; Mattsson, Haakan

    2011-01-01

    This report presents the rock type coding, overview lithological mapping and identification of rock units and possible deformation zones in drill cores from 32 boreholes associated with the construction of SFR. This work can be seen as complementary to single-hole interpretations of other older SFR boreholes earlier reported in /Petersson and Andersson 2010/: KFR04, KFR08, KFR09, KFR13, KFR35, KFR36, KFR54, KFR55, KFR7A, KFR7B and KFR7C. Due to deficiencies in the available material, the necessary activities have deviated somewhat from the established methodologies used during the recent Forsmark site investigations for the final repository for spent nuclear fuel. The aim of the current work has been, wherever possible, to allow the incorporation of all relevant material from older boreholes in the ongoing SFR geological modelling work in spite of the deficiencies. The activities include: - Rock type coding of the original geological mapping according to the nomenclature used during the preceding Forsmark site investigation. As part of the Forsmark site investigation such rock type coding has already been performed on most of the old SFR boreholes if the original geological mapping results were available. This earlier work has been complemented by rock type coding on two further boreholes: KFR01 and KFR02. - Lithological overview mapping, including documentation of (1) rock types, (2) ductile and brittle-ductile deformation and (3) alteration for drill cores from eleven of the boreholes for which no original geological borehole mapping was available (KFR31, KFR32, KFR34, KFR37,KFR38, KFR51, KFR69, KFR70, KFR71, KFR72 and KFR89). - Identification of possible deformation zones and merging of similar rock types into rock units. This follows SKB's established criteria and methodology of the geological Single-hole interpretation (SHI) process wherever possible. Deviations from the standard SHI process are associated with the lack of data, for example BIPS images, or a

  6. RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2012, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, P. M.

    2013-02-21

    This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101, issued 10/17/10.

  7. Study on construction technology for repository

    International Nuclear Information System (INIS)

    Tanai, Kenji; Iwasa, Kengo; Hasegawa, Hiroshi; Miura, Kazuhiko; Okutsu, Kazuo; Kobayashi, Masaaki

    1999-11-01

    For the construction of underground facilities comprising access tunnels, connecting tunnels, main tunnels and disposal tunnels, a large number of tunnels will be excavated in deep rock formations. These excavations will extend hundreds kilometers in total length. Therefore, special attention must be paid, to transporting large volume of debris, ventilation, emergency escape routes in case of accident, and other factors. In addition, special attention must also paid to potential accidents which might in underground excavations, including unstable facing phenomena (such as collapse and swelling of facing at weak layer sections), spring water flow resulting collapse of rock, gas eruption, and rock burst. While considering these factors to be emphasized during the construction of geological disposal facilities, the investigation reviewed the existing working methods on individual construction technologies of access tunnels, main tunnels, connecting tunnels, disposal tunnels, and disposal pit, based on the recognition that the present state deals with a wide range of geological environments, and conducted investigation about the construction methods for each tunnel on the basis current technologies, and described the outline of these methods. Furthermore, for the items to be particularly emphasized on site characterization and siting data such as ground pressure and spring water, the investigation reviewed the current countermeasure works, and made survey on the phenomena appeared during actual tunnel construction works and their countermeasures, and carried out a study on effectiveness of these countermeasures. This constructing of disposal site in deep geological formations is basically possible by applying, or confirming, current excavation technologies for tunnels and underground facilities. A systematic construction system combines separate technologies relating to construction, (excavation technology, tunnel support work method, etc.). Such systems can be

  8. Number Size Distribution of Ambient Particles in a Typical Urban Site: The First Polish Assessment Based on Long-Term (9 Months Measurements

    Directory of Open Access Journals (Sweden)

    Krzysztof Klejnowski

    2013-01-01

    Full Text Available This work presents results from the long-term measurements of particle number carried out at an urban background station in Zabrze, Poland. Ambient particles with aerodynamic diameters of between 28 nm and 10 μm were investigated by means of a DEKATI thirteen-stage electrical low pressure impactor (ELPI. The particle number-size distribution was bimodal, whilst its density function had the local maxima in the aerodynamic diameter intervals 0.056–0.095 μm and 0.157–0.263 μm. The average particle number in winter was nearly twice as high as in summer. The greatest number concentrations in winter were those of the particles with diameters of between 0.617 and 2.41 μm, that is, the anthropogenic particles from fossil fuel combustion. Approximately 99% of the particles observed in Zabrze had aerodynamic diameters ≤1 μm—they may have originated from the combustion of biomass, liquid, and gaseous fuels in domestic stoves or in car engines. The daily variation of particle number was similar for both seasons—the highest values were observed in the morning (traffic rush hour and in the afternoon/late evening (traffic and house heating emissions. An additional maximum (0.028–0.056 μm observed in the early afternoon in summer was due to the intensive formation of new PM particles from gas precursors.

  9. Annual Site Environmental Report Prepared for the Department of Energy,under contract number DE-AC03-76SF00515 January - December 2001

    International Nuclear Information System (INIS)

    Russak, Hillary M.

    2003-01-01

    This report provides information about environmental programs during 2001 at the Stanford Linear Accelerator Center (SLAC). Also included are seasonal activities that cross calendar-year divisions. Production of the annual site environmental report (ASER) is a requirement established by the US Department of Energy (DOE) for all management and operating (M and O) contractors throughout the DOE complex. SLAC is federally-funded, research development center with Stanford University as the M and O contractor. The most noteworthy information in this report is summarized in this section. This summary demonstrates the effective application of SLAC environmental management in meeting the site's Integrated Safety Management System (ISMS) goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed to meet the ISMS goals: Worker safety and health are protected; The environment is protected; and Compliance is assured. Throughout 2001, SLAC focused on these activities through the SLAC management systems. These systems were also the ways SLAC approached implementing the ''Greening of the Government'' initiatives (such as Executive Order 13148). The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC did not receive any notices of violation during 2001. In addition, many improvements were continued during 2001, including improvements in the storm drain system, improved ground water monitoring capabilities, and enhancements to the system to manage the generation of mixed wastes. Environmental program-specific summary details are shown below

  10. Annual Site Environmental Report Prepared for the Department of Energy,under contract number DE-AC03-76SF00515 January - December 2001

    Energy Technology Data Exchange (ETDEWEB)

    Russak, Hillary M.

    2003-05-06

    This report provides information about environmental programs during 2001 at the Stanford Linear Accelerator Center (SLAC). Also included are seasonal activities that cross calendar-year divisions. Production of the annual site environmental report (ASER) is a requirement established by the US Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is federally-funded, research development center with Stanford University as the M and O contractor. The most noteworthy information in this report is summarized in this section. This summary demonstrates the effective application of SLAC environmental management in meeting the site's Integrated Safety Management System (ISMS) goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed to meet the ISMS goals: Worker safety and health are protected; The environment is protected; and Compliance is assured. Throughout 2001, SLAC focused on these activities through the SLAC management systems. These systems were also the ways SLAC approached implementing the ''Greening of the Government'' initiatives (such as Executive Order 13148). The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC did not receive any notices of violation during 2001. In addition, many improvements were continued during 2001, including improvements in the storm drain system, improved ground water monitoring capabilities, and enhancements to the system to manage the generation of mixed wastes. Environmental program-specific summary details are shown below.

  11. Site Practice

    DEFF Research Database (Denmark)

    Wahedi, Haseebullah

    2016-01-01

    different practices in the construction phase. The research is based on an ethnographic study of a case in Denmark. The empirical data were collected through direct observations and semi-structured interviews with site managers, contract managers, foremen and craftsmen. Findings revealed...... that the construction phase comprises several communities and practices, leading to various uses of the drawings. The results indicated that the craftsmen used drawings to position themselves in the correct location, and that the site managers and contract managers used them as management tools and legal documents...

  12. Reduced number of (/sup 3/H)nicotine and (/sup 3/H)acelylcholine binding sites in the frontal cortex of Alzheimer brains

    Energy Technology Data Exchange (ETDEWEB)

    Nordberg, A; Winblad, B

    1986-12-03

    Nicotinic cholinergic receptors were measured in human frontal cortex using (/sup 3/H)nicotine and (/sup 3/H)acetylcholine (in the presence of atropine) as receptor ligands. A parallel marked reduction in number of (/sup 3/H)nicotine (52%, P<0.01) and (/sup 3/H)acetylcholine (-55%, P<0.05) binding was found in the frontal cortex of Alzheimer brains (AD/SDAT) when compared to age-matched control brains. As a comparison the number of muscarinic receptors was quantified using (/sup 3/H)quinuclidinyl benzilate and found to be significantly increased (+23%, P<0.01) in AD/SDAT compared to controls. 26 refs.

  13. Site operations

    International Nuclear Information System (INIS)

    House, W.B.; Ebenhack, D.G.

    1989-01-01

    This chapter is a discussion of the management and operations practices used at the Barnwell Waste Management Facility in Barnwell, SC. The following topics are discussed: (1) Waste receiving and inspection, including manifest and certificates of compliance, radiological surveys, disposition of nonconforming items, and decontamination and disposition of secondary waste streams; (2) Waste disposal, including Title 10 CFR 61 requirements, disposal area evaluations, shipment offloading, container emplacement, and radiation protection; (3) Trench closure, including trench backfilling, trench capping, and permanent markers; (4) Site maintenance and stabilization, including trench maintenance, surface water management, and site closure activities; (5) Site monitoring programs, including operational monitoring, and environmental monitoring program; (6) Personnel training and qualifications, including basic training program, safety training program, special skills training, and physical qualifications; (7) Records management, including waste records, personnel training records, personnel dosimetry records, site monitoring records, trench qualification and construction records, and site drawings and stabilization records; (8) Site security; (9) Emergency response plans; and (10) Quality assurance

  14. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J. [CH2M HILL Plateau Remediation Company, P.O. Box 1600, MSIN R4-41, 99352 (United States)

    2013-07-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

  15. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    International Nuclear Information System (INIS)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2012-01-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W PandT) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012

  16. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    International Nuclear Information System (INIS)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    2013-01-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

  17. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Ostrom, Michael J. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Freeman-Pollard, Jhivaun R. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2012-11-14

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.

  18. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2013-01-11

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.

  19. Characteristics of Ambient Black Carbon Mass and Size-Resolved Particle Number Concentrations during Corn Straw Open-Field Burning Episode Observations at a Rural Site in Southern Taiwan.

    Science.gov (United States)

    Cheng, Yu-Hsiang; Yang, Li-Sing

    2016-07-08

    Information on the effect of open-field burning of agricultural residues on ambient black carbon (BC) mass and size-resolved particle number concentrations is scarce. In this study, to understand the effect of such open-field burning on short-term air quality, real-time variations of the BC mass and size-resolved particle number concentrations were monitored before and during a corn straw open-field burning episode at a rural site. Correlations between the BC mass and size-resolved particle number concentrations during the episode were investigated. Moreover, the particle number size distribution and absorption Ångström exponent were determined for obtaining the characteristics of aerosol emissions from the corn straw open-field burning. The results can be used to address public health concerns and as a reference for managing similar episodes of open-field burning of agricultural residues.

  20. Modelling Constructs

    DEFF Research Database (Denmark)

    Kindler, Ekkart

    2009-01-01

    , these notations have been extended in order to increase expressiveness and to be more competitive. This resulted in an increasing number of notations and formalisms for modelling business processes and in an increase of the different modelling constructs provided by modelling notations, which makes it difficult......There are many different notations and formalisms for modelling business processes and workflows. These notations and formalisms have been introduced with different purposes and objectives. Later, influenced by other notations, comparisons with other tools, or by standardization efforts...... to compare modelling notations and to make transformations between them. One of the reasons is that, in each notation, the new concepts are introduced in a different way by extending the already existing constructs. In this chapter, we go the opposite direction: We show that it is possible to add most...

  1. Modeling and simulation of aggregation of membrane protein LAT with molecular variability in the number of binding sites for cytosolic Grb2-SOS1-Grb2.

    Directory of Open Access Journals (Sweden)

    Ambarish Nag

    Full Text Available The linker for activation of T cells (LAT, the linker for activation of B cells (LAB, and the linker for activation of X cells (LAX form a family of transmembrane adaptor proteins widely expressed in lymphocytes. These scaffolding proteins have multiple binding motifs that, when phosphorylated, bind the SH2 domain of the cytosolic adaptor Grb2. Thus, the valence of LAT, LAB and LAX for Grb2 is variable, depending on the strength of receptor activation that initiates phosphorylation. During signaling, the LAT population will exhibit a time-varying distribution of Grb2 valences from zero to three. In the cytosol, Grb2 forms 1:1 and 2:1 complexes with the guanine nucleotide exchange factor SOS1. The 2:1 complex can bridge two LAT molecules when each Grb2, through their SH2 domains, binds to a phosphorylated site on a separate LAT. In T cells and mast cells, after receptor engagement, receptor phosphoyrlation is rapidly followed by LAT phosphorylation and aggregation. In mast cells, aggregates containing more than one hundred LAT molecules have been detected. Previously we considered a homogeneous population of trivalent LAT molecules and showed that for a range of Grb2, SOS1 and LAT concentrations, an equilibrium theory for LAT aggregation predicts the formation of a gel-like phase comprising a very large aggregate (superaggregate. We now extend this theory to investigate the effects of a distribution of Grb2 valence in the LAT population on the formation of LAT aggregates and superaggregate and use stochastic simulations to calculate the fraction of the total LAT population in the superaggregate.

  2. Proposed Use of a Constructed Wetland for the Treatment of Metals in the S-04 Outfall of the Defense Waste Processing Facility at the Savannah River Site

    International Nuclear Information System (INIS)

    Glover, T.

    1999-01-01

    The DWPF is part of an integrated waste treatment system at the SRS to treat wastes containing radioactive contaminants. In the early 1980s the DOE recognized that there would be significant safety and cost advantages associated with immobilizing the radioactive waste in a stable solid form. The Defense Waste Processing Facility was designed and constructed to accomplish this task

  3. Industrial hygiene survey report of Millstone Nuclear Power Station No. 3 construction site (Northeast Utilities Service Co./Stone and Webster Engineering Corp.) Waterford, Connecticut

    International Nuclear Information System (INIS)

    Zaebst, D.D.; Herrick, R.H.

    1985-11-01

    The purpose of the study was to conduct an in-depth industrial hygiene survey to determine exposures of painters to coating components during the construction of a nuclear power plant. The survey was conducted as part of the Industrywide Studies Branch survey of Health Hazards in the Painting Trades

  4. Proposed Use of a Constructed Wetland for the Treatment of Metals in the S-04 Outfall of the Defense Waste Processing Facility at the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Glover, T.

    1999-11-23

    The DWPF is part of an integrated waste treatment system at the SRS to treat wastes containing radioactive contaminants. In the early 1980s the DOE recognized that there would be significant safety and cost advantages associated with immobilizing the radioactive waste in a stable solid form. The Defense Waste Processing Facility was designed and constructed to accomplish this task.

  5. 基于区间数的空中进攻作战信息流转模式构建%Information flowing pattern construction for air offensive campaign based on interval number

    Institute of Scientific and Technical Information of China (English)

    杨迎辉; 李建华; 丁未; 南明莉

    2014-01-01

    An efficient and reasonable information flowing pattern is the precondition and important guaran-tee for effective implementation of an air offensive campaign (AOC).To construct an information flowing pat-tern for AOC,basic definitions of the information flowing pattern are given based on the complex network theo-ry,and the information flowing relationships between intelligence security,operational command and weapon control in the three stages of AOC are analyzed.By introducing the concept and operation rules of the interval number,and taking information flow,information quality and transmission time as optimization targets,the multi-objective programming model of the information flowing pattern for AOC based on the interval number is constructed.Combined with methods of linear weight and interval number satisfaction,the model is translated into a two-level nesting optimization problem of signal-objective with a certain type,and the differential evolve-ment algorithm is chosen to solve it.Finally,the rationality and feasibility of the model and method are verified through a specific example.%高效合理的信息流转模式是有效实施空中进攻作战的前提和重要保障。针对空中进攻作战信息流转模式构建问题,给出了基于复杂网络理论的信息流转模式基本定义,解析了空中进攻作战3个阶段的情报保障、作战指挥和武器控制信息的流转关系。引入区间数概念及运算规则,以信息流量、信息质量和传输时间为优化目标,构建了基于区间数的空中进攻作战信息流转模式多目标规划模型,结合线性加权法和区间数满意度,将其划归为单目标确定型两层嵌套优化模型,并利用微分进化算法进行求解。最后结合实例,验证了该模型与方法的合理性与可行性。

  6. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  7. Site development

    International Nuclear Information System (INIS)

    Gaynor, R.K.

    1989-01-01

    Development of a low-level radioactive waste land disposal facility is little different than any industrial development of similar scope. Consideration must be made for normal business and operations management, security, facility maintenance, traffic control and necessary amenities for personnel. The item specific to the low-level waste site is the handling of radioactive waste materials and the regulatory and environmental protection procedures that must be planned for and accomodated in the site design and development. Each of these elements and the facility as a whole must be designed to be compatible with local land use plans, available transportation and support services, and the social and economic goals of the local community. Plans should also be made for quality control and orderly construction. This chapter deals with those aspects of the facility, its design and construction which are integral parts to the overall performance of the site

  8. The Traveller Fórum : An Advice-seeking Site Contributing to the Construction of Parental Social Actors and to On-line Parental Bond Creations

    OpenAIRE

    Dolón Herrero, Rosana

    2014-01-01

    This paper studies how parental social actors and co-parental relationships are interactively constructed in traveller forums, analysing a corpus obtained from the London for Kids Trip Advisor forum, and carrying out a qualitative study of the interactants¿ uses of kids in their choice of transitivity patterns. Starting from a Critical Discourse Analytical methodological framework and from corpus-driven research, I address the question of how participants are endowed with authority and legiti...

  9. Application of frequency- and time-domain electromagnetic surveys to characterize hydrostratigraphy and landfill construction at the Amargosa Desert Research Site, Beatty, Nevada

    Science.gov (United States)

    White, Eric A.; Day-Lewis, Frederick D.; Johnson, Carole D.; Lane, John W.

    2016-01-01

    In 2014 and 2015, the U.S. Geological Survey (USGS), conducted frequency-domain electromagnetic (FDEM) surveys at the USGS Amargosa Desert Research Site (ADRS), approximately 17 kilometers (km) south of Beatty, Nevada. The FDEM surveys were conducted within and adjacent to a closed low-level radioactive waste disposal site located at the ADRS. FDEM surveys were conducted on a grid of north-south and east-west profiles to assess the locations and boundaries of historically recorded waste-disposal trenches. In 2015, the USGS conducted time-domain (TDEM) soundings along a profile adjacent to the disposal site (landfill) in cooperation with the U.S. Environmental Protection Agency (USEPA), to assess the thickness and characteristics of the underlying deep unsaturated zone, and the hydrostratigraphy of the underlying saturated zone.FDEM survey results indicate the general location and extent of the waste-disposal trenches and reveal potential differences in material properties and the type and concentration of waste in several areas of the landfill. The TDEM surveys provide information on the underlying hydrostratigraphy and characteristics of the unsaturated zone that inform the site conceptual model and support an improved understanding of the hydrostratigraphic framework. Additional work is needed to interpret the TDEM results in the context of the local and regional structural geology.

  10. Construction of Insulin 18-mer Nanoassemblies Driven by Coordination to Iron(II) and Zinc(II) Ions at Distinct Sites

    DEFF Research Database (Denmark)

    Munch, Henrik K.; Nygaard, Jesper; Christensen, Niels Johan

    2016-01-01

    Controlled self-assembly (SA) of proteins offers the possibility to tune their properties or to create new materials. Herein, we present the synthesis of a modified human insulin (HI) with two distinct metal-ion binding sites, one native, the other abiotic, enabling hierarchical SA through...

  11. Well-construction and hydrogeologic data for observation wells in the vicinity of a low-level radioactive-waste disposal site near Sheffield, Illinois

    Science.gov (United States)

    Mansue, Lawrence J.; Mills, Patrick C.

    1991-01-01

    The U.S. Geological Survey conducted hydrogeologic studies at the low-level radioactive-waste disposal site near Sheffield, Illinois, from 1976 through 1987. During that period, 108 observation wells were installed in the vicinity of the disposal site in glacial and post-glacial deposits of Quaternary age and bedrock of Pennsylvanian age. Data in this report include the location of each well, the date each well was drilled, the geologic units penetrated by each well, the physical measurements of each well, the elevations of the top (measuring point) of each well and geologic-unit contacts at each well, and the highest and lowest recorded water levels in each well.

  12. Demosite - Demonstration of the integration of photovoltaic elements in buildings; DEMOSITE. Site de demonstration d'elements de construction photovoltaiques integres au batiment

    Energy Technology Data Exchange (ETDEWEB)

    Roecker, C.; Affolter, P.; Muller, A.N.; Ould-Yenia, A.

    2003-07-01

    This final report for the Swiss Federal Office of Energy summarises Phase 4 of the DEMOSITE project and concludes 10 years of DEMOSITE activities. The DEMOSITE project, started in 1992, demonstrates various ways of integrating photovoltaic elements in buildings by providing stands, pavilions and monitoring facilities at its site in Lausanne, Switzerland. Here, at the Swiss Federal Institute of Technology, roof-mounted installations can be found as well as mock-ups of buildings and roofing systems that also serve as covered parking facilities. The DEMOSITE web site and graphical presentations are also reviewed. Furthermore, the six newest pavilions are presented in detail. The report also presents several sets of data from measurements made on the installations and discusses the dissemination of information and results obtained from the project. A comprehensive annex provides illustrations of examples of building-integrated photovoltaics from around the world.

  13. Innovate the Teaching of Taiwaness History: An Application of Multimedia Distance Learning—A Web-site Construction Sample of Shih Hsin University

    Directory of Open Access Journals (Sweden)

    Shaw-Fong Lee

    2004-03-01

    Full Text Available Traditionally, the teaching of history course mostly utilizes face to face instruction and oral presentation. Along with the development of educational technology, the teaching methods could be more various such as using internet and multimedia. Literature reviews also indicate that using internet and multimedia may improve the effect of learning and teaching. This paper explores the development of a web-based instructional system for the course of Taiwanese History at Shih Hsin University.The result and the product of this development project is the web site, http://distance.shu.edu.tw/taiwan/list.htm. The content of the web-site includes instructional materials such as animations, videos, pictures, texts, historical maps, and so on. The developmental methods used in this project use curriculum design, survey, interview, review of literatures and focus group discussion.[Article content in Chinese

  14. HITACHI construction CAE system

    International Nuclear Information System (INIS)

    Yoshida, M.

    1994-01-01

    Construction and maintenance of nuclear power plants have important problems such as shortening the construction period and reducing the construction cost. Recently, the problem of insufficient construction labor has arisen, and as drastic strategic development has become a necessary counter-measure. The following four principles are included in the measures to be taken for efficient execution of the construction work within the short construction period: (1) reduction of on-site work and expansion of module block making, (2)improvement of the accuracy of the on-site work process, adjustment and expansion of the work in parallel with the construction process, (3)improvement of efficiency of the on-site work and mechanization and automation of the work, (4)improvement of the accuracy of the management of the construction. A three dimensional simulation system plant construction plan CAE, comprising five modules has been developed. A project management system was also developed to improve the accuracy and efficiency of management work in the field

  15. Geologic and well-construction data for the H-10 borehole complex near the proposed Waste Isolation Pilot Plant site, southeastern New Mexico

    International Nuclear Information System (INIS)

    Wells, J.G.; Drellack, S.L. Jr.

    1983-01-01

    The H-10 borehole complex, a group of three closely spaced boreholes, is located 4 miles southeast of the proposed Waste Isolation Pilot Plant site in west-central Lea County, New Mexico. The holes were drilled during August and October 1979 to obtain geologic and hydrologic data to better define the regional ground-water-flow system. The geologic data presented in this report are part of a site-characterization study for the possible storage of defense-associated radioactive wastes within salt beds of the Salado Formation of Permian age. The geologic data include detailed descriptions of cores, cuttings, and geophysical logs. Each borehole was designed to penetrate a distinct water-bearing zone: H-10a (total depth 1318 feet) was completed just below the Magenta Dolomite Member of the Rustler Formation of Permian age; H-10b (total depth 1398 feet) was completed just below the Culebra Dolomite Member of the Rustler Formation; and H-10c (total depth 1538 feet) was completed below the Rustler Formation-Salado Formation contact. The geologic units penetrated in borehole H-10c are surficial alluvium and eolian sand of Holocene age (0 to 5 feet); the Mescalero caliche (5 to 9 feet) and the Gatuna Formation (9 to 90 feet) of Pleistocene age: formations in the Dockum Group (Chinle Formation, 90 to 482 feet and Santa Rosa Sandstone, 482 to 658 feet) of Late Triassic age; and the Dewey Lake Red Beds (658 to 1204 feet), the Rustler Formation (1204 to 1501 feet), and part of the Salado Formation (1501 to 1538 feet), all of Permian age. The sections of the Rustler and Salado Formations penetrated by borehole H-10c are complete and contain little or no evidence of dissolution of halite and associated rocks, indicating that the eastward-moving dissolution within the Rustler or on top of the Salado, found west of the Waste Isolation Pilot Plant site, has not reached the H-10 site

  16. Geologic and well-construction data for the H-8 borehole complex near the proposed Waste Isolation Pilot Plant site, southeastern New Mexico

    Science.gov (United States)

    Wells, J.G.; Drellack, S.L.

    1982-01-01

    The H-8 complex, a group of three closely-spaced boreholes, is located 9 miles south of the proposed Waste Isolation Pilot Plant site in southeastern Eddy County, New Mexico. The holes were drilled during July, August, and September of 1979 to obtain geologic and hydrologic data to better define the regional ground-water-flow system. The geologic data presented in this report are part of a site-characterization study for the possible disposal of defense-associated radioactive wastes within salt beds of the Salado Formation of Permian age. The geologic data include detailed descriptions of cores, cuttings, and geophysical logs. Each borehole was designed to penetrate a distinct water-bearing zone: H-8a (total depth 505 feet) was completed just below the Magenta Dolomite Member of the Rustler Formation of Permian Age; H-8b (total depth 624 feet) was completed just belows the Culebra Dolomite Member of the Rustler Formation; and H-8c (total depth 808 feet) was completed just below the Rustler Formation-Salado Formation contact. The geologic units penetrated in borehole H-8c are surficial alluvium and eolian sand of Holocene age (0-4 feet); the Mescalero caliche (4-10 feet) and Gatuna Formation (10-153 feet) , both of Pleistocene age; and the Dewey Lake Red Beds (153-399 feet), the Rustler Formation (399-733 feet), and part of the Salado Formation penetrated by borehole H-8c is composed of residue from dissolution of halite and associated rocks, and the hydration of anhydrite to gypsum, indicating that the eastward-moving dissolution front on top of the Salado, found just to the west of the WIPP site, has reached the H-8 site. (USGS)

  17. Geologic and well-construction data for the H-9 borehole complex near the proposed Waste Isolation Pilot Plant site, southeastern New Mexico

    Science.gov (United States)

    Drellack, S.L.; Wells, J.G.

    1982-01-01

    The H-9 complex, a group of three closely spaced boreholes, is located 5.5 miles south of the proposed Waste Isolation Pilot Plant (WIPP) site in east-central Eddy County, New Mexico. The holes were drilled during July, August, and September 1979 to obtain geologic and hydrologic data to better define the regional ground-water-flow system. The geologic data presented in this report are part of a site-characterization study for the possible storage of defense-associated radioactive wastes within salt beds of the Salado Formation of Permian age. The geologic data include detailed descriptions of cores, cuttings, and geophysical logs. Each borehole was designed to penetrate a distinct water-bearing zone: H-9a (total depth 559 feet) was completed just below the Magenta Dolomite Member of the Rustler Formation; H-9b (total depth 708 feet) was completed just below the Culebra Dolomite Member of the Rustler Formation; H-9c (total depth 816 feet) was completed below the Rustler Formation-Salado Formation contact. The geologic units penetrated in borehole H-9c are eolian sand of Holocene age (0-5 feet); the Gatuna Formation of Pleistocene age; (5-25 feet); and the Dewey Lake Red Beds (25-455 feet), the Rustler Formation (455.791 feet), and part of the Salado Formation (791-816 feet), all of Permian age. Three sections (494-501 feet, 615-625 feet, 692-712 feet) in the Rustler Formation penetrated by borehole H-9c are composed of remnant anhydrite (locally altered to gypsum) and clay and silt residue from the dissolution of much thicker seams of argillaceous and silty halite. This indicates that the eastward-moving dissolution within the Rustler Formation, found just to the west of the WIPP site, is present at the H-9 site. (USGS)

  18. Geologic and well-construction data for the H-10 borehole complex near the proposed Waste Isolation Pilot Plant site, southeastern New Mexico

    Science.gov (United States)

    Wells, J.G.; Drellack, S.L.

    1983-01-01

    The H-10 borehole complex, a group of three closely spaced boreholes, is located 3 1/2 miles southeast of the proposed Waste Isolation Pilot Plant site in west-central Lea County, New Mexico. The geological data presented in this report are part of a site-characterization study for the possible storage of defense-associated radioactive wastes within salt beds of the Salado Formation of Permian age. Each borehole was designated to penetrate a distinct water-bearing zone: H-10a (total depth 1 ,318 feet) was completed just below the Magenta Dolomite Member of the Rustler Formation of Permian age; H-10b (total depth 1 ,398 feet) was completed just below the Culebra Dolomite Member of the Rustler Formation; and H-10c (total depth 1,538 feet) was completed below the Rustler Formation-Salado Formation contact. The geologic units penetrated in borehole H-10c are surficial alluvium and eolian sand of Holocene age (0-5 feet); the Mescalero caliche (5-9 feet) and the Gatuna Formation (9-90 feet) of Pleistocene age; formation in the Dockum Group (Chinle Formation, 90-482 feet and Santa Rosa Sandstone, 482-658 feet) of Late Triassic age; and the Dewey Lake Red Beds (658-1,204 feet), the Rustler Formation (1,204-1,501 feet), and part of the Salado Formation (1,501-1,538 feet), all of Permian age. The sections of the Rustler and Salado Formations penetrated by borehole H-10c are complete and contain little or no evidence of dissolution of halite and associated rocks, indicating that the eastward-moving dissolution on top of the Salado, found just to the west of the WIPP site, has not reached the H-10 site. (USGS)

  19. Nuclear power plant siting

    International Nuclear Information System (INIS)

    Sulkiewicz, M.; Navratil, J.

    The construction of a nuclear power plant is conditioned on territorial requirements and is accompanied by the disturbance of the environment, land occupation, population migration, the emission of radioactive wastes, thermal pollution, etc. On the other hand, a nuclear power plant makes possible the introduction of district heating and increases the economic and civilization activity of the population. Due to the construction of a nuclear power plant the set limits of negative impacts must not be exceeded. The locality should be selected such as to reduce the unfavourable effects of the plant and to fully use its benefits. The decision on the siting of the nuclear power plant is preceded by the processing of a number of surveys and a wide range of documentation to which the given criteria are strictly applied. (B.H.)

  20. Law no. 10.308 of 20th November, 2001 on radioactive waste repositories siting, construction, licensing, operation, inspection, costs, indemnity, civil liability and guarantees concerning to the radioactive wastes repositories and other provisions

    International Nuclear Information System (INIS)

    2001-01-01

    This Act was published on November 20, 2001 and set forth regulations on the final disposal of radioactive wastes produced in Brazil, including siting, construction, licensing, operation, inspection, costs, indemnities, civil liability and guarantees concerning to the radioactive wastes repositories. This act allows for installation and operation of initial, intermediary and final repositories in accordance with the criteria established by the Brazilian Nuclear Energy National Commission - CNEN. The person or organization granted with CNEN authorization for operation of the initial repositories shall be liable for personal, patrimony and environmental radiological damages. The civil liability of CNEN is concerned to the radioactive waste intermediary and final disposals and transportation

  1. Hupa Numbers.

    Science.gov (United States)

    Bennett, Ruth, Ed.; And Others

    An introduction to the Hupa number system is provided in this workbook, one in a series of numerous materials developed to promote the use of the Hupa language. The book is written in English with Hupa terms used only for the names of numbers. The opening pages present the numbers from 1-10, giving the numeral, the Hupa word, the English word, and…

  2. Triangular Numbers

    Indian Academy of Sciences (India)

    Admin

    Triangular number, figurate num- ber, rangoli, Brahmagupta–Pell equation, Jacobi triple product identity. Figure 1. The first four triangular numbers. Left: Anuradha S Garge completed her PhD from. Pune University in 2008 under the supervision of Prof. S A Katre. Her research interests include K-theory and number theory.

  3. Proth Numbers

    Directory of Open Access Journals (Sweden)

    Schwarzweller Christoph

    2015-02-01

    Full Text Available In this article we introduce Proth numbers and prove two theorems on such numbers being prime [3]. We also give revised versions of Pocklington’s theorem and of the Legendre symbol. Finally, we prove Pepin’s theorem and that the fifth Fermat number is not prime.

  4. Sagan numbers

    OpenAIRE

    Mendonça, J. Ricardo G.

    2012-01-01

    We define a new class of numbers based on the first occurrence of certain patterns of zeros and ones in the expansion of irracional numbers in a given basis and call them Sagan numbers, since they were first mentioned, in a special case, by the North-american astronomer Carl E. Sagan in his science-fiction novel "Contact." Sagan numbers hold connections with a wealth of mathematical ideas. We describe some properties of the newly defined numbers and indicate directions for further amusement.

  5. Constructed Wetlands

    Science.gov (United States)

    these systems can improve water quality, engineers and scientists construct systems that replicate the functions of natural wetlands. Constructed wetlands are treatment systems that use natural processes

  6. Disbursement of $65 million to the State of Texas for construction of a Regional Medical Technology Center at the former Superconducting Super Collider Site, Waxahachie, Texas

    International Nuclear Information System (INIS)

    1995-05-01

    As part of a settlement agreement between the US DOE and the State of Texas, DOE proposes to transfer $65 million of federal funds to the Texas National Research Laboratory Commission (TNLRC) for construction of the Regional Medical Technology Center (RMTC) to be located in Ellis County, Texas. The RMTC would be a state-of-the-art medical facility for proton cancer therapy, operated by the State of Texas in conjunction with the University of Texas Southwestern Medical Center. The RMTC would use the linear accelerator assets of the recently terminated DOE Superconducting Super Collider Project to accelerate protons to high energies for the treatment of cancer patients. The current design provides for treatment areas, examination rooms, support laboratories, diagnostic imaging equipment, and office space as well as the accelerators (linac and synchrotron) and beam steering and shaping components. The potential environmental consequences of the proposed action are expected to be minor

  7. Repository site characterization

    International Nuclear Information System (INIS)

    Voss, J.W.; Pentz, D.L.

    1987-01-01

    The characterization of candidate repository sites has a number of programmatic objectives. Principal among these is the acquisition of data: a) to determine the suitability of a site relative to the DOE repository siting guidelines, b) to support model development and calculations to determine the suitability of a site relative to the post closure criteria of the NRC and EPA, c) to support the design of a disposal system, including the waste package and the engineered barrier system, as well as the shafts and underground openings of the repository. In meeting the gaols of site characterization, the authors have an obligation to conduct their investigations within an appropriate budget and schedule. This mandates that a well-constructed and systematic plan for field investigations be developed. Such a plan must fully account for the mechanisms which will control the radiologic performance in the repository. The plan must also flexibly and dynamically respond to the results of each step of field investigation, responding to the spatial variability of earth as well as to enhanced understandings of the performance of the disposal system. Such a plan must ensure that sufficient data are available to support the necessary probabilistic calculations of performance. This paper explores the planning for field data acquisition with specific reference to requirements for demonstrations of the acceptable performance for disposal systems

  8. Análisis de la gestión de la seguridad y salud en las obras de construcción en Sudáfrica. Nueva regulación en materia preventiva, nuevos desafíos, nuevas oportunidades = Management analysis of Health and Safety on construction sites in South Africa, New c

    Directory of Open Access Journals (Sweden)

    Jesús Esteban Gabriela

    2015-05-01

    new challenges in the construction sector. On the one hand, the need for a new model of energy sector to assist the sustainable growth of the country and its modernization, and secondly the urgent need to improve the high number of accidents rates that the construction sector still keeps to date. On last February, 2014, the Ministry of Labor released a new construction regulations – construction regulations 2014 – modifying to Construction Regulations 2003, regulating the new duties and obligations on health and safety belong to all agents involved with special emphasis on the role of “Client” as the backbone of promoting the health and safety matters on construction sites. The emergence of new mandatory professionals appointments on health and safety both for client and principal contractor – contractor, endow to current safety organizational chart on site with a better structure and clarity to undertake the implementation of the basic principles of preventive safety management through monitoring by these professionals based in all new safety documents established likewise ("risk assessment", "health and safety specification", "fall protection plan "and" health and safety file ". The register of these new safety roles through SACPCMP - “South African Council for Project and Construction Management Professions”, will come into in force on 6th august, 2015. This register will provide better professionalism of technicians who perform those duties, essential point to keep improving the accidents – incidents rates on construction sector in South Africa.

  9. Organizing Construction Practices in Different Cultural Contexts

    DEFF Research Database (Denmark)

    Thuesen, Christian; Rasmussen, Christian K. S.

    2013-01-01

    a number of characteristics and challenges related to the cultural context have been identified highlighting a central issue in existing and future construction practices due to the globalization and thereby increasing importance of cultural understanding in project-based organizing. The empirical findings......This paper presents in-depth case studies of construction practices with a specific focus on understanding the emergent and dynamic nature of construction management in different cultural contexts. The cases are based on actual working-experiences by the author as an assistant project manager...... participating in the construction management on site working for three different contractors in different cultural contexts: (1) Construir Futuro S.A. in Quito, Ecuador; (2) Anker Hansen & co. A/S in Copenhagen, Denmark; and (3) E. Pihl & Soen A/S in Stockholm, Sweden. Based on these explorative case studies...

  10. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    Science.gov (United States)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  11. Eulerian numbers

    CERN Document Server

    Petersen, T Kyle

    2015-01-01

    This text presents the Eulerian numbers in the context of modern enumerative, algebraic, and geometric combinatorics. The book first studies Eulerian numbers from a purely combinatorial point of view, then embarks on a tour of how these numbers arise in the study of hyperplane arrangements, polytopes, and simplicial complexes. Some topics include a thorough discussion of gamma-nonnegativity and real-rootedness for Eulerian polynomials, as well as the weak order and the shard intersection order of the symmetric group. The book also includes a parallel story of Catalan combinatorics, wherein the Eulerian numbers are replaced with Narayana numbers. Again there is a progression from combinatorics to geometry, including discussion of the associahedron and the lattice of noncrossing partitions. The final chapters discuss how both the Eulerian and Narayana numbers have analogues in any finite Coxeter group, with many of the same enumerative and geometric properties. There are four supplemental chapters throughout, ...

  12. Chemical soil data report to support interim response actions, construction staging area, and Administration Building: Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri: Revision 0

    International Nuclear Information System (INIS)

    1989-02-01

    Five activities are planned to improve environmental conditions or to improve facilities at the Weldon Spring Site. Each activity must be evaluated for potential environmental impacts. Chemical soil contamination was potentially present in each affected area. A sampling program was designed and implemented to evaluate chemical soil conditions. Samples were analyzed for nitroaromatic compounds, metals, inorganic anions, semi-volatile and volatile organic compounds, pesticides, and PCBs. This investigation documented low concentrations of semi-volatile organic compounds, pesticides, PCBs and nitroaromatics. Higher concentrations of nitrate, sulfate and some metals were also detected. The contaminants detected are consistent with past operations at the WSS. The concentrations of contaminants do not significantly impact the proposed activities. Data from this investigation has been incorporated into the planning and documentation activities for each activity

  13. Data recovery program to mitigate the effects of the construction of space transportation system facilities on seven archaeological sites on Vandenberg Air Force Base, Santa Barbara County, California

    International Nuclear Information System (INIS)

    Glassow, M.A.

    1979-01-01

    A plan is proposed for the recovery of data from three prehistoric habitation sites, 4-SBa-539, 670, and 931, which will be adversely affected by the Space Transportation System Project, Vandenberg Air Force Base, California. Phase II testing suggests that SBa-539 and 670, fall within the Late Period, AD 1000 to European contact, with a possible Middle-Period component at 670, while SBa-931, radiocarbon-dated to BC 6000, represents the Early Period, or Millingstone Horizon, of Southern California prehistory. Excavation will utilize conventional fine scale techniques and specialized sample collection. Data analysis will provide information on prehistoric subsistence and settlement patterns, inter-regional trade, and functions of distinctive artifact types. Cultural change will be identified and comparisons made between cultural developments of Vandenberg and neighboring regions

  14. A Comprehensive Study of Neutralizing Antigenic Sites on the Hepatitis E Virus (HEV) Capsid by Constructing, Clustering, and Characterizing a Tool Box*

    Science.gov (United States)

    Zhao, Min; Li, Xiao-Jing; Tang, Zi-Min; Yang, Fan; Wang, Si-Ling; Cai, Wei; Zhang, Ke; Xia, Ning-Shao; Zheng, Zi-Zheng

    2015-01-01

    The hepatitis E virus (HEV) ORF2 encodes a single structural capsid protein. The E2s domain (amino acids 459–606) of the capsid protein has been identified as the major immune target. All identified neutralizing epitopes are located on this domain; however, a comprehensive characterization of antigenic sites on the domain is lacking due to its high degree of conformation dependence. Here, we used the statistical software SPSS to analyze cELISA (competitive ELISA) data to classify monoclonal antibodies (mAbs), which recognized conformational epitopes on E2s domain. Using this novel analysis method, we identified various conformational mAbs that recognized the E2s domain. These mAbs were distributed into 6 independent groups, suggesting the presence of at least 6 epitopes. Twelve representative mAbs covering the six groups were selected as a tool box to further map functional antigenic sites on the E2s domain. By combining functional and location information of the 12 representative mAbs, this study provided a complete picture of potential neutralizing epitope regions and immune-dominant determinants on E2s domain. One epitope region is located on top of the E2s domain close to the monomer interface; the other is located on the monomer side of the E2s dimer around the groove zone. Besides, two non-neutralizing epitopes were also identified on E2s domain that did not stimulate neutralizing antibodies. Our results help further the understanding of protective mechanisms induced by the HEV vaccine. Furthermore, the tool box with 12 representative mAbs will be useful for studying the HEV infection process. PMID:26085097

  15. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  16. Asymptotic numbers: Pt.1

    International Nuclear Information System (INIS)

    Todorov, T.D.

    1980-01-01

    The set of asymptotic numbers A as a system of generalized numbers including the system of real numbers R, as well as infinitely small (infinitesimals) and infinitely large numbers, is introduced. The detailed algebraic properties of A, which are unusual as compared with the known algebraic structures, are studied. It is proved that the set of asymptotic numbers A cannot be isomorphically embedded as a subspace in any group, ring or field, but some particular subsets of asymptotic numbers are shown to be groups, rings, and fields. The algebraic operation, additive and multiplicative forms, and the algebraic properties are constructed in an appropriate way. It is shown that the asymptotic numbers give rise to a new type of generalized functions quite analogous to the distributions of Schwartz allowing, however, the operation multiplication. A possible application of these functions to quantum theory is discussed

  17. Transfinite Numbers

    Indian Academy of Sciences (India)

    Transfinite Numbers. What is Infinity? S M Srivastava. In a series of revolutionary articles written during the last quarter of the nineteenth century, the great Ger- man mathematician Georg Cantor removed the age-old mistrust of infinity and created an exceptionally beau- tiful and useful theory of transfinite numbers. This is.

  18. TPX tokamak construction management

    International Nuclear Information System (INIS)

    Knutson, D.; Kungl, D.; Seidel, P.; Halfast, C.

    1995-01-01

    A construction management contract normally involves the acquisition of a construction management firm to assist in the design, planning, budget conformance, and coordination of the construction effort. In addition the construction management firm acts as an agent in the awarding of lower tier contracts. The TPX Tokamak Construction Management (TCM) approach differs in that the construction management firm is also directly responsible for the assembly and installation of the tokamak including the design and fabrication of all tooling required for assembly. The Systems Integration Support (SIS) contractor is responsible for the architect-engineering design of ancillary systems, such as heating and cooling, buildings, modifications and site improvements, and a variety of electrical requirements, including switchyards and >4kV power distribution. The TCM will be responsible for the procurement of materials and the installation of the ancillary systems, which can either be performed directly by the TCM or subcontracted to a lower tier subcontractor. Assurance that the TPX tokamak is properly assembled and ready for operation when turned over to the operations team is the primary focus of the construction management effort. To accomplish this a disciplined constructability program will be instituted. The constructability effort will involve the effective and timely integration of construction expertise into the planning, component design, and field operations. Although individual component design groups will provide liaison during the machine assembly operations, the construction management team is responsible for assembly

  19. Construction of an Environmentally Sustainable Development on a Modified Coastal Sand Mined and Landfill Site – Part 1. Planning and Implementation

    Directory of Open Access Journals (Sweden)

    AnneMarie Clements

    2009-06-01

    Full Text Available The Magenta Shores development fronts 2.3 km of Tuggerah Beach on a formerly sand mined and landfill site in an urban growth area on the central coast of New South Wales. To increase the natural defences against storm waves and mass sand movements, the incipient foredune was retained and the parallel beach ridge landform was re-established by mimicking natural processes. Analysis of waste and resources led to a coordinated large-scale onsite re-use, recycling and waste management program that reduced landfill, transportation and natural resource requirements. Bitou bush removed from the Coastal Protection Zone was incorporated into golf course soils to improve grass growth. Leachate in the groundwater from the former landfill was diverted away from Tuggerah Lake and re-used in golf course irrigation. Upgrade of the local sewer treatment plant and installation of a public dual pipeline servicing Magenta and the adjoining township satisfied irrigation demands and provided non-potable water for the existing and expanding urban community. The sustainability challenges of the project were met through clear identification of existing environmental risks, application of scientific research, integrated team management and stakeholders’ cooperation.

  20. ITER towards the construction

    International Nuclear Information System (INIS)

    Shimomura, Y.

    2005-01-01

    The ITER Project has been significantly developed in the last few years in preparation for its construction. The ITER Participant's Negotiators have developed the Joint Implementation Agreement (JIA), ready for finalisation following selection of the construction site and nomination of the project's Director General. The ITER International Team and Participant Teams have continued technical and organisational preparations. Construction will be able to start immediately after the international ITER organisation is established, following signature of the JIA. The Project is strongly supported by the governments of the Participants as well as by the scientific community. The real negotiations, including siting and the final details of cost sharing, started in December 2003. The EU, with Cadarache, and Japan, with Rokkasho, have both promised large contributions to the project to strongly support their construction site proposals. Their wish to host ITER construction is too strong to allow convergence to a single site considering the ITER device in isolation. A broader collaboration among the Parties is therefore being contemplated, covering complementary activities to help accelerate fusion development towards a viable power source, and allow the Participants to reach a conclusion on ITER siting. This report reviews these preparations, and the status of negotiations

  1. Model of investment appraisal of high-rise construction with account of cost of land resources

    Science.gov (United States)

    Okolelova, Ella; Shibaeva, Marina; Trukhina, Natalya

    2018-03-01

    The article considers problems and potential of high-rise construction as a global urbanization. The results of theoretical and practical studies on the appraisal of investments in high-rise construction are provided. High-rise construction has a number of apparent upsides in modern terms of development of megapolises and primarily it is economically efficient. Amid serious lack of construction sites, skyscrapers successfully deal with the need of manufacturing, office and living premises. Nevertheless, there are plenty issues, which are related with high-rise construction, and only thorough scrutiny of them allow to estimate the real economic efficiency of this branch. The article focuses on the question of economic efficiency of high-rise construction. The suggested model allows adjusting the parameters of a facility under construction, setting the tone for market value as well as the coefficient for appreciation of the construction net cost, that depends on the number of storey's, in the form of function or discrete values.

  2. Development of Innovative Construction Technologies for ABWRs

    International Nuclear Information System (INIS)

    Yamashita, T.; Fukuda, T.; Masuda, N.

    2002-01-01

    This paper describes an effort by Tokyo Electric Power Company (TEPCO) to shorten the construction time in a drastic manner for the Advanced Boiling Water Reactors (ABWR), thereby aiming at reducing construction costs. First an outline of the actual construction records for the five BWR Units and the two ABWR Units at the Kashiwazaki-Kariwa site is introduced along with the construction methods employed for these units. There is a continued trend in the reduction of construction time from Unit 1 to 7 owing to a number of improvements made to these units, and in particular it is noteworthy that the drastic reduction was accomplished due to the change in reactor type from BWR to ABWR. Explained next is an on-going effort for the next ABWR and the following next generation of ABWRs to further shorten construction time. In this effort an emphasis is laid on the development of innovative construction methods by the adoption of steel plate/concrete composite structures (SC Structure), and the application of those structures even to containment vessel (so-called SCCV). This work is being conducted as part of TEPCO's research and development for the next generation ABWRs (ABWR II). Presently it is expected that the construction time from bedrock inspection to fuel loading could be shortened in a stepwise fashion to 38 and 31.5 months for the next ABWR and finally to 23 months for the next generation ABWR II, thus enabling a greatly reduced power generating cost and enhanced safety during construction. In addition to the above effort, a preliminary study has been performed concerning the application of base isolation systems to ABWR plants. From this study which is aimed at standardization, lowered cost and mitigation of engineering work, it was found that base isolation system effectively reduces seismic response and is instrumental in achieving the above-mentioned objectives. Therefore it can be said that the use of this system gives more freedom in selecting sites

  3. Construction industry accidents in Spain.

    Science.gov (United States)

    Camino López, Miguel A; Ritzel, Dale O; Fontaneda, Ignacio; González Alcantara, Oscar J

    2008-01-01

    This paper analyzed industrial accidents that take place on construction sites and their severity. Eighteen variables were studied. We analyzed the influence of each of these with respect to the severity and fatality of the accident. This descriptive analysis was grounded in 1,630,452 accidents, representing the total number of accidents suffered by workers in the construction sector in Spain over the period 1990-2000. It was shown that age, type of contract, time of accident, length of service in the company, company size, day of the week, and the remainder of the variables under analysis influenced the seriousness of the accident. IMPACT ON INJURY PREVENTION: The results obtained show that different training was needed, depending on the severity of accidents, for different age, length of service in the company, organization of work, and time when workers work. The research provides an insight to the likely causes of construction injuries in Spain. As a result of the analysis, industries and governmental agencies in Spain can start to provide appropriate strategies and training to the construction workers.

  4. The supply chain of civil construction industries for support the nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sriyana; Moch-Djoko Birmano; Sahala Lumbanraja; Nurlaila

    2013-01-01

    The use of domestic products for electricity infrastructure has been set out in the Ministerial Decree number: 54/M-IND/PER/3/2012, but the infrastructure of nuclear power plants (NPP) construction has not been included. Therefore, the potential of the local industries needs to be mapped it especially supply chain of civil construction industries to estimate the capability of the local component level (DCL) at the nuclear power plant project in Indonesia. NPP is a high-technology so that if NPP will be constructed, it is necessary to involve the national capability as media technology transfer, especially for EPC (Engineering, Procurement and Construction) services. Civil construction (civil part) play role is very large, about 21%. Therefore it is necessary in particular the role of the national civil construction industry to increase the capability of local content. Preparation of Civil construction infrastructure are depend on the supply chain of raw materials. The aim of the research was to map the supply chain of the civil construction industries. Methodology this study is a survey of national industries, literature review, and searching web site. The result study is a map of civil construction industries with raw material supply chain. (author)

  5. Chocolate Numbers

    OpenAIRE

    Ji, Caleb; Khovanova, Tanya; Park, Robin; Song, Angela

    2015-01-01

    In this paper, we consider a game played on a rectangular $m \\times n$ gridded chocolate bar. Each move, a player breaks the bar along a grid line. Each move after that consists of taking any piece of chocolate and breaking it again along existing grid lines, until just $mn$ individual squares remain. This paper enumerates the number of ways to break an $m \\times n$ bar, which we call chocolate numbers, and introduces four new sequences related to these numbers. Using various techniques, we p...

  6. Number theory

    CERN Document Server

    Andrews, George E

    1994-01-01

    Although mathematics majors are usually conversant with number theory by the time they have completed a course in abstract algebra, other undergraduates, especially those in education and the liberal arts, often need a more basic introduction to the topic.In this book the author solves the problem of maintaining the interest of students at both levels by offering a combinatorial approach to elementary number theory. In studying number theory from such a perspective, mathematics majors are spared repetition and provided with new insights, while other students benefit from the consequent simpl

  7. Marine Hydrokinetic (MHK) Energy Conversion Research at UNH: From Fundamental Studies of Hydrofoil Sections, to Moderate Reynolds Number Turbine Tests in a Tow Tank, to Open Water Deployments at Tidal Energy Test Sites (Invited)

    Science.gov (United States)

    Wosnik, M.; Bachant, P.; Nedyalkov, I.; Rowell, M.; Dufresne, N.; Lyon, V.

    2013-12-01

    We report on research related to MHK turbines at the Center for Ocean Renewable Energy (CORE) at the University of New Hampshire (UNH). The research projects span varies scales, levels of complexity and environments - from fundamental studies of hydrofoil sections in a high speed water tunnel, to moderate Reynolds number turbine tests with inflow and wake studies in a large cross-section tow tank, to deployments of highly instrumented process models at tidal energy test sites in New England. A concerted effort over the past few years has brought significant new research infrastructure for marine hydrokinetic energy conversion online at UNH-CORE. It includes: a high-speed cavitation tunnel with independent control of velocity and pressure; a highly accurate tow mechanism, turbine test bed and wake traversing system for the 3.7m x 2.4m cross-section UNH tow tank; a 10.7m x 3.0m tidal energy test platform which can accommodate turbines up to 1.5m in diameter, for deployments at the UNH-CORE Tidal Energy Test Site in Great Bay Estuary, NH, a sheltered 'nursery site' suitable for intermediate scale tidal energy conversion device testing with peak currents typically above 2 m/s during each tidal cycle. Further, a large boundary layer wind tunnel, the new UNH Flow Physics Facility (W6.0m x H2.7m xL72m) is being used for detailed turbine wake studies, producing data and insight also applicable to MHK turbines in low Froude number deployments. Bi-directional hydrofoils, which perform equally well in either flow direction and could avoid the use of complex and maintenance-intensive yaw or blade pitch mechanisms, are being investigated theoretically, numerically and experimentally. For selected candidate shapes lift, drag, wake, and cavitation inception/desinence are measured. When combined with a cavitation inception model for MHK turbines, this information can be used to prescribe turbine design/operational parameters. Experiments were performed with a 1m diameter and 1m

  8. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 1 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  9. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 2 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  10. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 3 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  11. Nice numbers

    CERN Document Server

    Barnes, John

    2016-01-01

    In this intriguing book, John Barnes takes us on a journey through aspects of numbers much as he took us on a geometrical journey in Gems of Geometry. Similarly originating from a series of lectures for adult students at Reading and Oxford University, this book touches a variety of amusing and fascinating topics regarding numbers and their uses both ancient and modern. The author intrigues and challenges his audience with both fundamental number topics such as prime numbers and cryptography, and themes of daily needs and pleasures such as counting one's assets, keeping track of time, and enjoying music. Puzzles and exercises at the end of each lecture offer additional inspiration, and numerous illustrations accompany the reader. Furthermore, a number of appendices provides in-depth insights into diverse topics such as Pascal’s triangle, the Rubik cube, Mersenne’s curious keyboards, and many others. A theme running through is the thought of what is our favourite number. Written in an engaging and witty sty...

  12. Invitation to number theory

    CERN Document Server

    Ore, Oystein

    2017-01-01

    Number theory is the branch of mathematics concerned with the counting numbers, 1, 2, 3, … and their multiples and factors. Of particular importance are odd and even numbers, squares and cubes, and prime numbers. But in spite of their simplicity, you will meet a multitude of topics in this book: magic squares, cryptarithms, finding the day of the week for a given date, constructing regular polygons, pythagorean triples, and many more. In this revised edition, John Watkins and Robin Wilson have updated the text to bring it in line with contemporary developments. They have added new material on Fermat's Last Theorem, the role of computers in number theory, and the use of number theory in cryptography, and have made numerous minor changes in the presentation and layout of the text and the exercises.

  13. An unsaturated metal site-promoted approach to construct strongly coupled noble metal/HNb3O8 nanosheets for efficient thermo/photo-catalytic reduction.

    Science.gov (United States)

    Shen, Lijuan; Xia, Yuzhou; Lin, Sen; Liang, Shijing; Wu, Ling

    2017-10-05

    Creating two-dimensional (2D) crystal-metal heterostructures with an ultrathin thickness has spurred increasing research endeavors in catalysis because of its fascinating opportunities in tuning the electronic state at the surface and enhancing the chemical reactivity. Here we report a novel and facile Nb 4+ -assisted strategy for the in situ growth of highly dispersed Pd nanoparticles (NPs) on monolayer HNb 3 O 8 nanosheets (HNb 3 O 8 NS) constituting a 2D Pd/HNb 3 O 8 NS heterostructure composite without using extra reducing agents and stabilizing agents. The Pd NP formation is directed via a redox reaction between an oxidative Pd salt precursor (H 2 PdCl 4 ) and reductive unsaturated surface metal (Nb 4+ ) sites induced by light irradiation on monolayer HNb 3 O 8 NS. The periodic arrangement of metal Nb nodes on HNb 3 O 8 NS leads to a homogeneous distribution of Pd NPs. Density functional theory (DFT) calculations reveal that the direct redox reaction between the Nb 4+ and Pd 2+ ions leads to a strong chemical interaction between the formed Pd metal NPs and the monolayer HNb 3 O 8 support. Consequently, the as-obtained Pd/HNb 3 O 8 composite serves as a highly efficient bifunctional catalyst in both heterogeneous thermocatalytic and photocatalytic selective reduction of aromatic nitro compounds in water under ambient conditions. The achieved high activity originates from the unique 2D nanosheet configuration and in situ Pd incorporation, which leads to a large active surface area, strong metal-support interaction and enhanced charge transport capability. Moreover, this facile Nb 4+ -assisted synthetic route has demonstrated to be general, which can be applied to load other metals such as Au and Pt on monolayer HNb 3 O 8 NS. It is anticipated that this work can extend the facile preparation of noble metal/nanosheet 2D heterostructures, as well as promote the simultaneous capture of duple renewable thermal and photon energy sources to drive an energy efficient

  14. Random number generation

    International Nuclear Information System (INIS)

    Coveyou, R.R.

    1974-01-01

    The subject of random number generation is currently controversial. Differing opinions on this subject seem to stem from implicit or explicit differences in philosophy; in particular, from differing ideas concerning the role of probability in the real world of physical processes, electronic computers, and Monte Carlo calculations. An attempt is made here to reconcile these views. The role of stochastic ideas in mathematical models is discussed. In illustration of these ideas, a mathematical model of the use of random number generators in Monte Carlo calculations is constructed. This model is used to set up criteria for the comparison and evaluation of random number generators. (U.S.)

  15. Design of turbidity controls for Oklahoma highway construction.

    Science.gov (United States)

    2013-03-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction : industry to control the discharge of pollutants from the sites. The construction effluent guidelines or : ELGs require construction sites to reduce the p...

  16. Number names and number understanding

    DEFF Research Database (Denmark)

    Ejersbo, Lisser Rye; Misfeldt, Morten

    2014-01-01

    This paper concerns the results from the first year of a three-year research project involving the relationship between Danish number names and their corresponding digits in the canonical base 10 system. The project aims to develop a system to help the students’ understanding of the base 10 syste...... the Danish number names are more complicated than in other languages. Keywords: A research project in grade 0 and 1th in a Danish school, Base-10 system, two-digit number names, semiotic, cognitive perspectives....

  17. Electrochemical construction

    Science.gov (United States)

    Einstein, Harry; Grimes, Patrick G.

    1983-08-23

    An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

  18. Usability Constructs

    DEFF Research Database (Denmark)

    Hertzum, Morten; Clemmesen, Torkil; Hornbæk, Kasper Anders Søren

    2007-01-01

    Whereas research on usability predominantly employs universal definitions of the aspects that comprise usability, people experience their use of information systems through personal constructs. Based on 48 repertory-grid interviews, this study investigates how such personal constructs are affected...... use of constructs traditionally associated with usability (e.g., easy-to-use, intuitive, and liked). Further analysis of the data is ongoing...

  19. High-efficient photo-electron transport channel in SiC constructed by depositing cocatalysts selectively on specific surface sites for visible-light H{sub 2} production

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Da; Peng, Yuan; Wang, Qi; Pan, Nanyan; Guo, Zhongnan; Yuan, Wenxia, E-mail: wxyuanwz@163.com [Department of Chemistry, School of Chemistry and Biological Engineering, University of Science and Technology Beijing, Beijing 100083 (China)

    2016-04-18

    Control cocatalyst location on a metal-free semiconductor to promote surface charge transfer for decreasing the electron-hole recombination is crucial for enhancing solar energy conversion. Based on the findings that some metals have an affinity for bonding with the specific atoms of polar semiconductors at a heterostructure interface, we herein control Pt deposition selectively on the Si sites of a micro-SiC photocatalyst surface via in-situ photo-depositing. The Pt-Si bond forming on the interface constructs an excellent channel, which is responsible for accelerating photo-electron transfer from SiC to Pt and then reducing water under visible-light. The hydrogen production is enhanced by two orders of magnitude higher than that of bare SiC, and 2.5 times higher than that of random-depositing nano-Pt with the same loading amount.

  20. Transfinite Numbers

    Indian Academy of Sciences (India)

    this is a characteristic difference between finite and infinite sets and created an immensely useful branch of mathematics based on this idea which had a great impact on the whole of mathe- matics. For example, the question of what is a number (finite or infinite) is almost a philosophical one. However Cantor's work turned it ...