WorldWideScience

Sample records for scheduled three-year test

  1. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  2. An investigation on impacts of scheduling configurations on Mississippi biology subject area testing

    Science.gov (United States)

    Marchette, Frances Lenora

    The purpose of this mixed modal study was to compare the results of Biology Subject Area mean scores of students on a 4 x 4 block schedule, A/B block schedule, and traditional year-long schedule for 1A to 5A size schools. This study also reviewed the data to determine if minority or gender issues might influence the test results. Interviews with administrators and teachers were conducted about the type of schedule configuration they use and the influence that the schedule has on student academic performance on the Biology Subject Area Test. Additionally, this research further explored whether schedule configurations allow sufficient time for students to construct knowledge. This study is important to schools, teachers, and administrators because it can assist them in considering the impacts that different types of class schedules have on student performance and if ethnic or gender issues are influencing testing results. This study used the causal-comparative method for the quantitative portion of the study and constant comparative method for the qualitative portion to explore the relationship of school schedules on student academic achievement on the Mississippi Biology Subject Area Test. The aggregate means of selected student scores indicate that the Mississippi Biology Subject Area Test as a measure of student performance reveals no significant difference on student achievement for the three school schedule configurations. The data were adjusted for initial differences of gender, minority, and school size on the three schedule configurations. The results suggest that schools may employ various schedule configurations and expect student performance on the Mississippi Biology Subject Area Test to be unaffected. However, many areas of concern were identified in the interviews that might impact on school learning environments. These concerns relate to effective classroom management, the active involvement of students in learning, the adequacy of teacher education

  3. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  4. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  5. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  6. Shift work schedule and night work load: Effects on body mass index - a four-year longitudinal study.

    Science.gov (United States)

    Buchvold, Hogne Vikanes; Pallesen, Ståle; Waage, Siri; Bjorvatn, Bjørn

    2018-05-01

    Objectives The aim of this study was to investigate changes in body mass index (BMI) between different work schedules and different average number of yearly night shifts over a four-year follow-up period. Methods A prospective study of Norwegian nurses (N=2965) with different work schedules was conducted: day only, two-shift rotation (day and evening shifts), three-shift rotation (day, evening and night shifts), night only, those who changed towards night shifts, and those who changed away from schedules containing night shifts. Paired student's t-tests were used to evaluate within subgroup changes in BMI. Multiple linear regression analysis was used to evaluate between groups effects on BMI when adjusting for BMI at baseline, sex, age, marital status, children living at home, and years since graduation. The same regression model was used to evaluate the effect of average number of yearly night shifts on BMI change. Results We found that night workers [mean difference (MD) 1.30 (95% CI 0.70-1.90)], two shift workers [MD 0.48 (95% CI 0.20-0.75)], three shift workers [MD 0.46 (95% CI 0.30-0.62)], and those who changed work schedule away from [MD 0.57 (95% CI 0.17-0.84)] or towards night work [MD 0.63 (95% CI 0.20-1.05)] all had significant BMI gain (Pnight workers had significantly larger BMI gain compared to day workers [B=0.89 (95% CI 0.06-1.72), Pnight shifts and BMI change using our multiple linear regression model. Conclusions After adjusting for possible confounders, we found that BMI increased significantly more among night workers compared to day workers.

  7. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  8. Compliance testing of medical diagnostic x-ray equipment: three years experience of a public hospital in western Australia

    International Nuclear Information System (INIS)

    Tuchyna, T.; Jacob, C.S.

    2000-01-01

    Full text: A formal compliance testing program which began on 1 January 1997 called for all medical and diagnostic x-ray equipment to be tested according to protocols established by the Western Australian Radiological Council. This work describes the impact of the legislation three years post implementation on a major teaching Hospital with 45 x-ray tubes located throughout 37 rooms. Testing is performed prior to scheduled service by licensed compliance testers according to test methods specified in the Western Australian Compliance Testing Workbook, 1997. A dedicated non-invasive x-ray beam analyser is instrumental in accurately determining radiation output parameters of the generator and x-ray tube. Assessment of compliance is determined by a Qualified Expert. Repair and re-testing of non-compliant items is coordinated with service personnel. Notices of non-compliance were received for approximately 60% of the equipment in the Hospital following the equipment' first annual test. Reasons and seriousness of failure varied according to equipment category, test category, equipment use and age. The majority of non-compliance issues were resolved within 90 days. At the end of the third year of testing, approximately 75% of the x-ray units tested met the compliance criteria. The main reasons for non-compliance were found to be design limitations associated with old technology and the current radiation legislation that makes it difficult for older equipment to meet the stringent criteria. The number and categories of failure did not significantly decrease in the second or third years of testing. Exemptions from compliance criteria have been sought for two units on the basis of age and design. Units unable to meet the criteria following several repair attempts or where the cost of repair was deemed not justified, were decommissioned. Formal testing of medical x-ray equipment has demonstrated various non-compliance issues that did not significantly improve during the

  9. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2011-01-21

    This document contains the calendar year 2011 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2011, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2011.

  10. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2007-01-31

    This document contains the calendar year 2007 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2007 in which case the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2007.

  11. Schedules of controlled substances: temporary placement of three synthetic cannabinoids into Schedule I. Final order.

    Science.gov (United States)

    2013-05-16

    The Deputy Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to temporarily schedule three synthetic cannabinoids under the Controlled Substances Act (CSA) pursuant to the temporary scheduling provisions of 21 U.S.C. 811(h). The substances are (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48). This action is based on a finding by the Deputy Administrator that the placement of these synthetic cannabinoids and their salts, isomers and salts of isomers into Schedule I of the CSA is necessary to avoid an imminent hazard to the public safety. As a result of this order, the full effect of the CSA and the Controlled Substances Import and Export Act (CSIEA) and their implementing regulations including criminal, civil and administrative penalties, sanctions and regulatory controls of Schedule I substances will be imposed on the manufacture, distribution, possession, importation, and exportation of these synthetic cannabinoids.

  12. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  13. Fast Flux Test Facility: first three years of operation and future mission

    International Nuclear Information System (INIS)

    Peckinpaugh, C.L.; Newland, D.J.; Evans, E.A.

    1985-03-01

    In summary, the FFTF has proven to be a high performance, versatile test reactor. Results obtained during its first three years of operation - and those to be obtained in the coming years - are building a technology and experience base that is invaluable to future LMRs. The FFTF demonstrates proven LMR technology with a focus for the future and provides the US with international LMR technology leadership

  14. Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

    Science.gov (United States)

    Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten

    2013-01-01

    Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

  15. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2006-01-27

    This document contains the calendar year 2006 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2006 in which case the anticipated year for collection is provided. The project document package (PDP) for Surface Environmental Surveillance contains the milestone control log for the issuing of CY06 Environmental Surveillance Master Sampling Schedule WBS 4.2.3.21.3.03, milestone: RL00430306 (4830106-12).

  16. Preoperative chemoradiation for locally advanced rectal cancer: comparison of three radiation dose and fractionation schedules

    International Nuclear Information System (INIS)

    Park, Shin Hyung; Kim, Jae Chul

    2016-01-01

    The standard radiation dose for patients with locally rectal cancer treated with preoperative chemoradiotherapy is 45–50 Gy in 25–28 fractions. We aimed to assess whether a difference exists within this dose fractionation range. A retrospective analysis was performed to compare three dose fractionation schedules. Patients received 50 Gy in 25 fractions (group A), 50.4 Gy in 28 fractions (group B), or 45 Gy in 25 fractions (group C) to the whole pelvis, as well as concurrent 5-fluorouracil. Radical resection was scheduled for 8 weeks after concurrent chemoradiotherapy. Between September 2010 and August 2013, 175 patients were treated with preoperative chemoradiotherapy at our institution. Among those patients, 154 were eligible for analysis (55, 50, and 49 patients in groups A, B, and C, respectively). After the median follow-up period of 29 months (range, 5 to 48 months), no differences were found between the 3 groups regarding pathologic complete remission rate, tumor regression grade, treatment-related toxicity, 2-year locoregional recurrence-free survival, distant metastasis-free survival, disease-free survival, or overall survival. The circumferential resection margin width was a prognostic factor for 2-year locoregional recurrence-free survival, whereas ypN category was associated with distant metastasis-free survival, disease-free survival, and overall survival. High tumor regression grading score was correlated with 2-year distant metastasis-free survival and disease-free survival in univariate analysis. Three different radiation dose fractionation schedules, within the dose range recommended by the National Comprehensive Cancer Network, had no impact on pathologic tumor regression and early clinical outcome for locally advanced rectal cancer

  17. Preoperative chemoradiation for locally advanced rectal cancer: comparison of three radiation dose and fractionation schedules

    Energy Technology Data Exchange (ETDEWEB)

    Park, Shin Hyung; Kim, Jae Chul [Dept. of Radiation Oncology, Kyungpook National University School of Medicine, Daegu (Korea, Republic of)

    2016-06-15

    The standard radiation dose for patients with locally rectal cancer treated with preoperative chemoradiotherapy is 45–50 Gy in 25–28 fractions. We aimed to assess whether a difference exists within this dose fractionation range. A retrospective analysis was performed to compare three dose fractionation schedules. Patients received 50 Gy in 25 fractions (group A), 50.4 Gy in 28 fractions (group B), or 45 Gy in 25 fractions (group C) to the whole pelvis, as well as concurrent 5-fluorouracil. Radical resection was scheduled for 8 weeks after concurrent chemoradiotherapy. Between September 2010 and August 2013, 175 patients were treated with preoperative chemoradiotherapy at our institution. Among those patients, 154 were eligible for analysis (55, 50, and 49 patients in groups A, B, and C, respectively). After the median follow-up period of 29 months (range, 5 to 48 months), no differences were found between the 3 groups regarding pathologic complete remission rate, tumor regression grade, treatment-related toxicity, 2-year locoregional recurrence-free survival, distant metastasis-free survival, disease-free survival, or overall survival. The circumferential resection margin width was a prognostic factor for 2-year locoregional recurrence-free survival, whereas ypN category was associated with distant metastasis-free survival, disease-free survival, and overall survival. High tumor regression grading score was correlated with 2-year distant metastasis-free survival and disease-free survival in univariate analysis. Three different radiation dose fractionation schedules, within the dose range recommended by the National Comprehensive Cancer Network, had no impact on pathologic tumor regression and early clinical outcome for locally advanced rectal cancer.

  18. Duration of protection against hepatitis A for the current two-dose vaccine compared to a three-dose vaccine schedule in children

    Science.gov (United States)

    Raczniak, Gregory A.; Thomas, Timothy K.; Bulkow, Lisa R.; Negus, Susan E.; Zanis, Carolyn L.; Bruce, Michael G.; Spradling, Philip R.; Teshale, Eyasu H.; McMahon, Brian J.

    2015-01-01

    Background Hepatitis A is mostly a self-limiting disease but causes substantial economic burden. Consequently, United States Advisory Committee for Immunization Practices recommends inactivated hepatitis A vaccination for all children beginning at age 1 year and for high risk adults. The hepatitis A vaccine is highly effective but the duration of protection is unknown. Methods We examined the proportion of children with protective hepatitis A antibody levels (anti-HAV ≥20 mIU/mL) as well as the geometric mean concentration (GMC) of anti-HAV in a cross sectional convenience sample of individuals aged 12–24 years, who had been vaccinated with a two-dose schedule in childhood, with the initial dose at least 5 years ago. We compared a subset of data from persons vaccinated with two-doses (720 EL.U.) at age 3–6 years with a demographically similar prospective cohort that received a three-dose (360 EL.U.) schedule and have been followed for 17 years. Results No significant differences were observed when comparing GMC between the two cohorts at 10 (P = 0.467), 12 (P = 0.496), and 14 (P = 0.175) years post-immunization. For the three-dose cohort, protective antibody levels remain for 17 years and have leveled-off over the past 7 years. Conclusion The two- and three-dose schedules provide similar protection >14 years after vaccination, indicating a booster dose is not needed at this time. Plateauing anti-HAV GMC levels suggest protective antibody levels may persist long-term. PMID:23470239

  19. Comparison of two dose and three dose human papillomavirus vaccine schedules: cost effectiveness analysis based on transmission model.

    Science.gov (United States)

    Jit, Mark; Brisson, Marc; Laprise, Jean-François; Choi, Yoon Hong

    2015-01-06

    To investigate the incremental cost effectiveness of two dose human papillomavirus vaccination and of additionally giving a third dose. Cost effectiveness study based on a transmission dynamic model of human papillomavirus vaccination. Two dose schedules for bivalent or quadrivalent human papillomavirus vaccines were assumed to provide 10, 20, or 30 years' vaccine type protection and cross protection or lifelong vaccine type protection without cross protection. Three dose schedules were assumed to give lifelong vaccine type and cross protection. United Kingdom. Males and females aged 12-74 years. No, two, or three doses of human papillomavirus vaccine given routinely to 12 year old girls, with an initial catch-up campaign to 18 years. Costs (from the healthcare provider's perspective), health related utilities, and incremental cost effectiveness ratios. Giving at least two doses of vaccine seems to be highly cost effective across the entire range of scenarios considered at the quadrivalent vaccine list price of £86.50 (€109.23; $136.00) per dose. If two doses give only 10 years' protection but adding a third dose extends this to lifetime protection, then the third dose also seems to be cost effective at £86.50 per dose (median incremental cost effectiveness ratio £17,000, interquartile range £11,700-£25,800). If two doses protect for more than 20 years, then the third dose will have to be priced substantially lower (median threshold price £31, interquartile range £28-£35) to be cost effective. Results are similar for a bivalent vaccine priced at £80.50 per dose and when the same scenarios are explored by parameterising a Canadian model (HPV-ADVISE) with economic data from the United Kingdom. Two dose human papillomavirus vaccine schedules are likely to be the most cost effective option provided protection lasts for at least 20 years. As the precise duration of two dose schedules may not be known for decades, cohorts given two doses should be closely

  20. The effect of alternative work schedules (AWS) on performance during acquisition based testing at the U.S. Army Aberdeen Test Center

    OpenAIRE

    Thomas, Alicia J.

    2014-01-01

    Approved for public release; distribution is unlimited This project analyzed the effects of an alternate work schedule (AWS) on the performance of acquisition based testing conducted at the U.S. Army Aberdeen Test Center (ATC), a subordinate test center to the U.S. Army Test and Evaluation Command. The literature review uncovered how an AWS improved employee work and life balance and performance at three separate external companies. Other potential AWS success factors such as employee abse...

  1. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2010-01-08

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford Site environs per regulatory requirements. This document contains the calendar year 2010 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2010, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2010.

  2. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2009-01-20

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1 and DOE Order 5400.5. This document contains the calendar year 2009 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2009, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2009.

  3. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2008-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, "Environmental Protection Program," and DOE Order 5400.5, "Radiation Protection of the Public and the Environment." The environmental surveillance sampling design is described in the "Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office." This document contains the calendar year 2008 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2008, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2008.

  4. Advisory Committee on Immunization Practices Recommended Immunization Schedule for Children and Adolescents Aged 18 Years or Younger - United States, 2018.

    Science.gov (United States)

    Robinson, Candice L; Romero, José R; Kempe, Allison; Pellegrini, Cynthia; Szilagyi, Peter

    2018-02-09

    In October 2017, the Advisory Committee on Immunization Practices (ACIP) approved the Recommended Immunization Schedule for Children and Adolescents Aged 18 Years or Younger - United States, 2018. The 2018 child and adolescent immunization schedule summarizes ACIP recommendations, including several changes from the 2017 immunization schedules, in three figures and footnotes to the figures. These documents can be found on the CDC immunization schedule website (https://www.cdc.gov/vaccines/schedules/index.html). These immunization schedules are approved by ACIP (https://www.cdc.gov/vaccines/acip/index.html), the American Academy of Pediatrics (https://www.aap.org), the American Academy of Family Physicians (https://www.aafp.org), and the American College of Obstetricians and Gynecologists (https://www.acog.org). Health care providers are advised to use the figures and the footnotes together. The full ACIP recommendations for each vaccine, including contraindications and precautions, can be found at https://www.cdc.gov/vaccines/hcp/acip-recs/index.html. Providers should be aware that changes in recommendations for specific vaccines can occur between annual updates to the childhood/adolescent immunization schedules. If errors or omissions are discovered within the child and adolescent schedule, CDC posts revised versions on the CDC immunization schedule website.

  5. Use of scripts and script-fading procedures and activity schedules to develop spontaneous social interaction in a three-year-old girl with autism

    Directory of Open Access Journals (Sweden)

    Anna Budzińska

    2014-05-01

    Full Text Available Autism entails serious deficiencies in communication and social behaviors. Individuals with autism, even those who have received intensive language intervention, are often viewed as lacking spontaneous language. In addition, some children with autism lack the ability of spontaneously seeking to share enjoyment, interests, or achievements with other people (e.g., a lack of showing, bringing, or pointing out objects of interest to other people. The aim of the study was to use ABA teaching techniques such as script and script fading procedure and activity schedule to teach three-year-old girl with autism spontaneous social interaction and shape joint attention skills. The result shows that ABA techniques were very effective in teaching many verbal skills such as answering questions, making requests, initiating conversation and asking question. Comparison made after implemented teaching procedure shows her initiating of joint attention skill (IJA is at the appropriate level for her age.

  6. 77 FR 15529 - Revision of Fee Schedules; Fee Recovery for Fiscal Year 2012

    Science.gov (United States)

    2012-03-15

    ... and 171 Revision of Fee Schedules; Fee Recovery for Fiscal Year 2012; Proposed Rule #0;#0;Federal... REGULATORY COMMISSION 10 CFR Parts 170 and 171 [NRC-2011-0207] RIN 3150-AJ03 Revision of Fee Schedules; Fee..., inspection, and annual fees charged to its applicants and licensees. The proposed amendments are necessary to...

  7. 76 FR 14747 - Revision of Fee Schedules; Fee Recovery for Fiscal Year 2011

    Science.gov (United States)

    2011-03-17

    ... 171 Revision of Fee Schedules; Fee Recovery for Fiscal Year 2011; Proposed Rule #0;#0;Federal Register... COMMISSION 10 CFR Parts 170 and 171 RIN 3150-AI93 [NRC-2011-0016] Revision of Fee Schedules; Fee Recovery for... fees charged to its applicants and licensees. The proposed amendments are necessary to implement the...

  8. 10 CFR 32.103 - Schedule D-prototype tests for ice detection devices containing strontium-90.

    Science.gov (United States)

    2010-01-01

    ... water and the strontium-90 shall be considered leakage. (e) Observations. After each of the tests... 10 Energy 1 2010-01-01 2010-01-01 false Schedule D-prototype tests for ice detection devices... § 32.103 Schedule D—prototype tests for ice detection devices containing strontium-90. An applicant for...

  9. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  10. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  11. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results

  12. Development of an accelerated reliability test schedule for terrestrial solar cells

    Science.gov (United States)

    Lathrop, J. W.; Prince, J. L.

    1981-01-01

    An accelerated test schedule using a minimum amount of tests and a minimum number of cells has been developed on the basis of stress test results obtained from more than 1500 cells of seven different cell types. The proposed tests, which include bias-temperature, bias-temperature-humidity, power cycle, thermal cycle, and thermal shock tests, use as little as 10 and up to 25 cells, depending on the test type.

  13. SMART operational field test evaluation : scheduler survey report : final report

    Science.gov (United States)

    1997-06-01

    The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automatic scheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans to implement ITS as a site for an operational field test. The pur...

  14. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  15. Game injuries in relation to game schedules in the National Basketball Association.

    Science.gov (United States)

    Teramoto, Masaru; Cross, Chad L; Cushman, Daniel M; Maak, Travis G; Petron, David J; Willick, Stuart E

    2017-03-01

    Injury management is critical in the National Basketball Association (NBA), as players experience a wide variety of injuries. Recently, it has been suggested that game schedules, such as back-to-back games and four games in five days, increase the risk of injuries in the NBA. The aim of this study was to examine the association between game schedules and player injuries in the NBA. Descriptive epidemiology study. The present study analyzed game injuries and game schedules in the 2012-13 through 2014-15 regular seasons. Game injuries by game schedules and players' profiles were examined using an exact binomial test, the Fisher's exact test and the Mann-Whitney-Wilcoxon test. A Poisson regression analysis was performed to predict the number of game injuries sustained by each player from game schedules and injured players' profiles. There were a total of 681 cases of game injuries sustained by 280 different players during the three years (total N=1443 players). Playing back-to-back games or playing four games in five days alone was not associated with an increased rate of game injuries, whereas a significant positive association was found between game injuries and playing away from home (pNBA. The findings could be useful for designing optimal game schedules in the NBA as well as helping NBA teams make adjustments to minimize game injuries. Copyright © 2016 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.

  16. Descriptive Summaries of the Research Development Test & Evaluation. Army Appropriation Fiscal Year 1984. Supporting Data Fiscal Year 1984 Budget Estimate Submitted to Congress--February 1983. Volume II.

    Science.gov (United States)

    1983-02-01

    with the functional segmnents of the Army Comnmand. Control Subordinate System Architeture . Analyses within each section adgste functional/cperational...scwded for ta yew. The fund for ths proect mine not proportional to the number of taste because idvdW teat coats vany widely (e.g one teat may raquire...costs of conducting the tests scheduled for that year and are not proportional to the number of test scheduled because Ves of Indidual tests vary widely

  17. The impact of predictive genetic testing for hereditary nonpolyposis colorectal cancer: three years after testing.

    Science.gov (United States)

    Collins, Veronica R; Meiser, Bettina; Ukoumunne, Obioha C; Gaff, Clara; St John, D James; Halliday, Jane L

    2007-05-01

    To fully assess predictive genetic testing programs, it is important to assess outcomes over periods of time longer than the 1-year follow-up reported in the literature. We conducted a 3-year study of individuals who received predictive genetic test results for previously identified familial mutations in Australian Familial Cancer Clinics. Questionnaires were sent before attendance at the familial cancer clinic and 2 weeks, 4 months, 1 year, and 3 years after receiving test results. Psychological measures were included each time, and preventive behaviors were assessed at baseline and 1 and 3 years. Psychological measures were adjusted for age, gender, and baseline score. The study included 19 carriers and 54 non-carriers. We previously reported an increase in mean cancer-specific distress in carriers at 2 weeks with a return to baseline levels by 12 months. This level was maintained until 3 years. Non-carriers showed sustained decreases after testing with a significantly lower level at 3 years compared with baseline (P depression and anxiety scores did not differ between carriers and non-carriers and, at 3 years, were similar to baseline. All carriers and 7% of non-carriers had had a colonoscopy by 3 years, and 69% of 13 female carriers had undergone gynecological screening in the previous 2 years. Prophylactic surgery was rare. This report of long-term data indicates appropriate screening and improved psychological measures for non-carriers with no evidence of undue psychological distress in carriers of hereditary nonpolyposis colorectal cancer mutations.

  18. A randomised, double-blind, placebo-controlled, crossover study to assess the efficacy and safety of three dosing schedules of agalsidase alfa enzyme replacement therapy for Fabry disease.

    Science.gov (United States)

    Hughes, D A; Deegan, P B; Milligan, A; Wright, N; Butler, L H; Jacobs, A; Mehta, A B

    2013-07-01

    Anecdotal reports suggest that the currently approved dosing interval of agalsidase alfa (0.2 mg/kg/2 weeks) for Fabry disease treatment is too long. This randomised, double-blind, placebo-controlled, crossover study investigated three altered dosing intervals. 18 Fabry patients received three agalsidase alfa dosing schedules, each for four weeks (A: 0.2 mg/kg∗2 weeks, B: 0.1 mg/kg/week, C: 0.2 mg/kg/week). Health state, pain levels, sweat volume and latency and plasma and urinary globotriaosylceramide levels were recorded throughout the study. No significant differences were found among the schedules for the primary efficacy outcome of self-assessed health state, or for pain scores. A trend toward increased sweat volume on QSART testing, and reduced urine globotriaosylceramide concentration were seen with treatment schedule C. Agalsidase alfa was safe and well tolerated with all schedules. In conclusion, the primary analyses did not find weekly infusions of agalsidase alfa to be statistically better than the approved dosing schedule however the data indicates that further studies with more patients over a longer period are required to more accurately determine the optimum dose and schedule. Copyright © 2013 Elsevier Inc. All rights reserved.

  19. Reduction in depressive symptoms in primary prevention ICD scheduled patients - One year prospective study.

    Science.gov (United States)

    Amiaz, Revital; Asher, Elad; Rozen, Guy; Czerniak, Efrat; Levi, Linda; Weiser, Mark; Glikson, Michael

    2017-09-01

    Implantable Cardioverter Defibrillators (ICDs), have previously been associated with the onset of depression and anxiety. The aim of this one-year prospective study was to evaluate the rate of new onset psychopathological symptoms after elective ICD implantation. A total of 158 consecutive outpatients who were scheduled for an elective ICD implantation were diagnosed and screened based on the Mini International Neuropsychiatric Interview (MINI). Depression and anxiety were evaluated using the Hamilton Rating Scales for Depression (HAM-D) and Anxiety (HAM-A). Patient's attitude toward the ICD device was evaluated using a Visual Analog Scale (VAS). Patients' mean age was 64±12.4years; 134 (85%) were men, with the majority of patients performing the procedure for reasons of 'primary prevention'. According to the MINI diagnosis at baseline, three (2%) patients suffered from major depressive disorder and ten (6%) from dysthymia. Significant improvement in HAM-D mean scores was found between baseline, three months and one year after implantation (6.50±6.4; 4.10±5.3 and 2.7±4.6, respectively F(2100)=16.42; pdepressive symptoms, while the overall mindset toward the ICD device was positive and improved during the one-year follow-up. Copyright © 2017 Elsevier Inc. All rights reserved.

  20. Flexible Scheduling May Have a Positive Impact on School Library Circulation. A Review of: Gavigan, K., Pribesh, S., & Dickinson, G. (2010. Fixed or flexible schedule? Schedule impacts and school library circulation. Library and Information Science Research, 32(2, 131-37.

    Directory of Open Access Journals (Sweden)

    Ann Medaille

    2011-03-01

    elementary school responses, 33 (38% had fixed schedules, 44 (50% had partially flexible schedules, and 11 (13% had totally flexible schedules. Fifty-three schools supplied data regarding per-pupil check-out, and the average number of books checked out per student per year was 52, across all types of schools. The number of book check-outs per pupil differed according to schedule type. Students in schools with fixed schedules checked out an average of 51 books per year, those in schools with partially flexible schedules checked out 46 books per year, and those in schools with totally flexible schedules checked out 71 books per year. When the authors adjusted the data for other factors affecting circulation (such as location, socioeconomic status, collection size, staffing, and others, they found that students in schools with fixed schedules checked out 57 books per year, those in schools with partially flexible schedules checked out 68 books per year, and those in schools with totally flexible schedules checked out 102 books per year. The authors concluded that schedule accounts for 21% of variation in the rate of book check-out per pupil.Conclusion – These results suggest that the type of schedule used in elementary school library media centers does have a significant relation to circulation statistics. Specifically, when library media centres employ flexible scheduling, students are likely to check out more books per year on average. Although these results are not generalizable, this study provides much-needed research into the relationship between scheduling and circulation, and establishes a basis for further studies in this area.

  1. 10 CFR 32.101 - Schedule B-prototype tests for luminous safety devices for use in aircraft.

    Science.gov (United States)

    2010-01-01

    ....101 Schedule B—prototype tests for luminous safety devices for use in aircraft. An applicant for a... 10 Energy 1 2010-01-01 2010-01-01 false Schedule B-prototype tests for luminous safety devices for use in aircraft. 32.101 Section 32.101 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES...

  2. Cost/schedule performance measurement system utilized on the Fast Flux Test Facility project

    International Nuclear Information System (INIS)

    Brown, R.K.; Frost, R.A.; Zimmerman, F.M.

    1976-01-01

    An Earned Value-Integrated Cost/Schedule Performance Measurement System has been applied to a major nonmilitary nuclear design and construction project. This system is similar to the Department of Defense Cost/Schedule Performance Measurement System. The project is the Fast Flux Test Facility (a Fuels and Materials test reactor for the Liquid Metal Fast Breeder Reactor Program) being built at the Hanford Engineering Development Laboratory, Richland, Washington, by Westinghouse Hanford Company for the U. S. Energy Research and Development Administration. Because the project was well into the construction phase when the Earned Value System was being considered, it was decided that the principles of DOD's Cost/Schedule Control System Criteria would be applied to the extent possible but no major changes in accounting practices or management systems were imposed. Implementation of this system enabled the following questions to be answered: For work performed, how do actual costs compare with the budget for that work. What is the impact of cost and schedule variances at an overall project level composed of different kinds of activities. Without the Earned Value system, these questions could be answered in a qualitative, subjective manner at best

  3. APGEN Scheduling: 15 Years of Experience in Planning Automation

    Science.gov (United States)

    Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel

    2014-01-01

    In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

  4. Testing and correction of underground tanks at LLNL: Workplan and schedule

    International Nuclear Information System (INIS)

    Henry, R.K.; Schwartz, W.W.; Castro, D.J.

    1987-01-01

    This report defines a workplan and time schedule for leak tightness testing of underground tank systems and for corrective measures for systems shown by testing to leak. The systems addressed by this report failed a leak tightness test or the test results were inconclusive. The workplan prescribes testing all systems to yield conclusive results. Systems shown to leak will be repaired, retested, and either left in service or be closed. Materials effected by leakage will be cleaned up or removed. 2 figs., 2 tabs

  5. Relationships between Classroom Schedule Types and Performance on the Algebra I Criterion-Referenced Test

    Science.gov (United States)

    Murray, Gregory V.; Moyer-Packenham, Patricia S.

    2014-01-01

    One option for length of individual mathematics class periods is the schedule type selected for Algebra I classes. This study examined the relationship between student achievement, as indicated by Algebra I Criterion-Referenced Test scores, and the schedule type for Algebra I classes. Data obtained from the Utah State Office of Education included…

  6. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  7. Schedule reconciliation tests for management prudency determination

    International Nuclear Information System (INIS)

    Howell, G.E.

    1986-01-01

    The prudency audit of a nuclear project involves engineering, construction, financial, and management dimensions. The audit must retrospectively evaluate the decisions and actions of management decision makers and then equitably allocate the cost impacts of those decisions and actions in a comprehensive and objective manner. In most situations, determination of the impact of schedule delays is a paramount issue. Manzi and Associates uses an approach to schedule reconciliation that focuses on the site-specific, as-built condition. The as-built schedule model is analyzed by a backward pass, or but-for methodology which focuses on the causes and impacts of identified delays. The objective is to demonstrate that but-for the identified delay, the project could have been built in the as-planned time frame. The but-for methodology has been used in many contract dispute cases and is currently being applied to schedule reconciliation on several nuclear plants. The potential for applying this methodology to both new construction and retrofit projects is great

  8. Evaluation of three oil spill laboratory dispersant effectiveness tests

    International Nuclear Information System (INIS)

    Sullivan, D.; Farlow, J.; Sahatjian, K.A.

    1993-01-01

    Chemical dispersants can be used to reduce the interfacial tension of floating oil slicks so that the oils disperse more rapidly into the water column and thus pose less of a threat to shorelines, birds, and marine mammals. The laboratory test currently specified in federal regulations to measure dispersant effectiveness is not especially easy or inexpensive, and generates a rather large quantity of oily waste water. This paper describes the results of an effort by the EPA to identify a more suitable laboratory dispersant effectiveness test. EPA evaluated three laboratory methods: the Revised Standard Dispersant Effectiveness Test currently used (and required by regulation) in the United States, the swirling flask test (developed by Environment Canada), and the IFP-dilution test (used in france and other European countries). Six test oils and three dispersants were evaluated; dispersants were applied to the oil at an average 1:10 ratio (dispersant to oil) for each of the three laboratory methods. Screening efforts were used to focus on the most appropriate oil/dispersant combination for detailed study. A screening criterion was established that required a combination that gave at least 20% effectiveness results. The selected combination turned out to be Prudhoe Bay crude oil and the dispersant Corexit 9527. This combination was also most likely to be encountered in US coastal waters. The EPA evaluation concluded that the three tests gave similar precision results, but that the swirling flask test was fastest, cheapest, simplest, and required least operator skill. Further, EPA is considering conducting the dispersant effectiveness test itself, rather than having data submitted by a dispersant manufacturer, and establishing an acceptability criterion (45% efficiency) which would have to be met before a dispersant could be placed on the Product Schedule of the National Contingency Plan (NCP)

  9. Seasonal versus perennial immunotherapy: evaluation after three years of treatment.

    Science.gov (United States)

    Muñoz Lejarazu, D; Bernaola, G; Fernández, E; Audícana, M; Ventas, P; Martín, S; Fernández de Corres, L

    1993-01-01

    We have performed a comparative study to evaluate seasonal and perennial schedules after 3 years of immunotherapy. Sixty patients suffering from rhinitis and/or asthma due to grass pollen sensitization were randomly allocated to receive a semi-depot extract of Phleum pratense according to a perennial or seasonal schedule. The last year of the study, 14 patients were recruited as a control group without immunotherapy. The cumulative dose was 602 BU in the perennial group and 372 BU in the seasonal group. The frequency and severity of side-effects were similar and very low in both treated groups. The IgE level was significantly lower after perennial immunotherapy at the end of the first 2 years. A seasonal decrease in specific IgG levels was observed in patients who interrupted immunotherapy, while this was not observed in patients under the perennial schedule. Symptoms and medication scores did not show differences between groups. Nevertheless, we found a significant difference between treated patients and the control group.

  10. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  11. Dental Student Study Strategies: Are Self-Testing and Scheduling Related to Academic Performance?

    Science.gov (United States)

    McAndrew, Maureen; Morrow, Christina S; Atiyeh, Lindsey; Pierre, Gaëlle C

    2016-05-01

    Self-testing, a strategy wherein a student actively engages in creating questions and answers from study materials to assist with studying, has been found to be especially advantageous because it enhances future retrieval of information. Studies have found correlations among students' grade point averages (GPAs), self-testing, and rereading study strategies, as well as the spacing of study sessions over time. The aim of this study was to assess relationships among dental students' study strategies, scheduling of study time, and academic achievement. A 16-item survey requesting information on study habits, study schedules, and GPAs was distributed to 358 second-year dental students at New York University College of Dentistry. Additionally, the survey asked students to report the average number of hours per week they devoted to studying for didactic courses and preparing for hands-on preclinical courses. Of the 358 students, 94 (26%) responded to the survey. The vast majority of the respondents reported utilizing self-testing and rereading study strategies. High performers (with higher GPAs) were more likely to use self-testing, especially with flashcards, and to space their studying over multiple sessions. Lower performing students were more likely to highlight or underline their notes and to mass their study sessions or cram. Longer hours devoted to studying and practicing for simulation courses were associated with stronger performance; lower performers reported spending significantly fewer hours practicing for simulation courses. Half of the dental students surveyed said that they felt their studying would be more productive in the morning, although 84% reported doing most of their studying in the evening or late night. Sound study decisions depend on accurate regulation of ongoing learning and appropriate use and timing of evidence-based study strategies, so these results suggest that dental students may require guidance in these areas.

  12. Estimating dim light melatonin onset (DLMO) phase in adolescents using summer or school-year sleep/wake schedules.

    Science.gov (United States)

    Crowley, Stephanie J; Acebo, Christine; Fallone, Gahan; Carskadon, Mary A

    2006-12-01

    This analysis examined associations between the salivary dim light melatonin onset (DLMO) phase and self-selected sleep/ wake schedules in groups of children and adolescents during summer vacation and during the school year to determine the degree to which sleep/wake patterns can estimate salivary DLMO phase. Participants slept at home on self-selected schedules for 5 consecutive nights and reported their bedtime and wake-up time via daily telephone messages. Salivary melatonin was sampled in the laboratory on one evening every 30 minutes in dim light (females) contributed 149 DLMO phase and sleep/wake pattern measures while on a school year schedule ("school group"). A separate group, ages 9 to 16 years (mean age = 13.1, SD = 1.3 years, 30 males, 29 females) contributed 59 DLMO phase and sleep/wake pattern measures while on a summer schedule ("summer group"). Bedtime, midsleep time, and wake-up time were positively correlated with DLMO phase in both groups. Although all correlation coefficients for the summer group were statistically greater compared to the school group, the regression equations predicted DLMO phase within +/- 1 hour of the measured DLMO phase in approximately 80% for both groups. DLMO phase can be estimated using self-selected sleep/wake patterns during the school year or summer vacation in healthy children and adolescents.

  13. Flexible Working and Couples' Coordination of Time Schedules

    OpenAIRE

    Bryan, Mark L.; Sevilla Sanz, Almudena

    2014-01-01

    Using previously unexploited data on time scheduling in the employment and household contexts, we investigate the effect of flexible working on couples' coordination of their daily work time schedules in the UK. We consider three distinct dimensions of flexible working: flexibility of daily start and finish times (flexitime), flexibility of work times over the year (annualised hours), and generalised control of working hours. We find that in couples with flexitime there is greater spouse sync...

  14. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2005-01-19

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This document contains the calendar year 2005 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project.

  15. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  16. Development and evaluation of a scheduling algorithm for parallel hardware tests at CERN

    CERN Document Server

    Galetzka, Michael

    This thesis aims at describing the problem of scheduling, evaluating different scheduling algorithms and comparing them with each other as well as with the current prototype solution. The implementation of the final solution will be delineated, as will the design considerations that led to it. The CERN Large Hadron Collider (LHC) has to deal with unprecedented stored energy, both in its particle beams and its superconducting magnet circuits. This energy could result in major equipment damage and downtime if it is not properly extracted from the machine. Before commissioning the machine with the particle beam, several thousands of tests have to be executed, analyzed and tracked to assess the proper functioning of the equipment and protection systems. These tests access the accelerator's equipment in order to verify the correct behavior of all systems, such as magnets, power converters and interlock controllers. A test could, for example, ramp the magnet to a certain energy level and then provoke an emergency...

  17. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  18. A new typology of work schedules: Evidence from a cross-sectional study among nurses working in residential elder care.

    Science.gov (United States)

    Peters, V; de Rijk, A; Engels, J; Heerkens, Y; Nijhuis, F

    2016-04-07

    Work schedules contribute substantially to the health and well-being of nurses. Too broad typologies are used in research that do not meet the current variety in work schedules. To develop a new typology for nurses' work schedules based on five requirements and to validate the typology. This study is based on a questionnaire returned by 498 nurses (response 51%) including questions regarding nurses' work schedule, socio-demographic, and family characteristics and their appraisal of the work schedule. Frequencies of the different schedules were computed to determine the typology. To validate the typology, differences between the types were tested with ANOVAs, Chi2 and Kruskal-Wallis tests. Five main types can be distinguished based on predetermined requirements and frequencies, namely: (1) fixed early shift, (2) rotating two shift pattern without night shift, (3) rotating three shift pattern, (4) fixed and rotating two shift pattern including night shift, and (5) fixed normal day or afternoon shifts. Nurses in these types of work schedule differed significantly with respect to hours worked, days off between shifts, age, education, years in the job, commuting time, contribution to household income, satisfaction with work schedule and work schedule control. Especially nurses with type 3 schedules differed from other types. A typology of five main types of work schedules is proposed. Content validity of the typology is sufficient and the new typology seems useful for research on work-related aspects of nursing.

  19. Comparing three scheduling methods using BIM models in the Last Planner System

    Directory of Open Access Journals (Sweden)

    Brioso Xavier

    2017-12-01

    Full Text Available This article presents strategies for teaching scheduling methods such as takt-time, flowlines, and point-to-point precedence relations (PTPPRs using build­ing information modeling (BIM models in the Last Planner System. This article is the extended version of the article entitled “Teaching Takt-Time, Flowline and Point-to-point Precedence Relations: A Peruvian Case Study,” which has been published in Procedia Engineering (Vol. 196, 2017, pages 666-673. A case study is conducted in final year students of civil engineering at the Pontifical Catholic University of Peru. The mock-up project is an educational building that has high repetitive processes in the struc­tural works phase. First, traditional tools such as Excel spreadsheets and 2D drawings were used to teach produc­tion system design with takt-time, flowlines, and PTPPR. Second, 3D and 4D models with Revit 2016 and Navis­works 2016 were used to integrate the previous schedules with a BIM model and to identify its strengths and weak­nesses. Finally, Vico Office was used for the automation of schedules and comparison of the methods in 4D and 5D. This article describes the lectures, workshops, and simu­lations employed, as well as the feedback from students and researchers. The success of the teaching strategy is reflected in the survey responses from students and the final perceptions of the construction management tools presented.

  20. Comparing Book- and Tablet-Based Picture Activity Schedules: Acquisition and Preference.

    Science.gov (United States)

    Giles, Aimee; Markham, Victoria

    2017-09-01

    Picture activity schedules consist of a sequence of images representing the order of tasks for a person to complete. Although, picture activity schedules have traditionally been presented in a book format, recently picture activity schedules have been evaluated on technological devices such as an iPod™ touch. The present study compared the efficiency of picture activity schedule acquisition on book- and tablet-based modalities. In addition, participant preference for each modality was assessed. Three boys aged below 5 years with a diagnosis of autism participated. Participants were taught to follow the schedules using both modalities. Following mastery of each modality of picture activity schedule, a concurrent-chains preference assessment was conducted to evaluate participant preference for each modality. Differences in acquisition rates across the two modalities were marginal. Preference for book- or tablet-based schedules was idiosyncratic across participants.

  1. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  2. 78 FR 61991 - Schedules of Controlled Substances: Temporary Placement of Three Synthetic Phenethylamines Into...

    Science.gov (United States)

    2013-10-10

    ... 202 of the CSA, 21 U.S.C. 812, or if there is no exemption or approval in effect under section 505 of... the last 10 years for use in mapping and investigating the serotonin receptors in the mammalian brain..., and 25B-NBOMe are often purported to be Schedule I hallucinogens like lysergic acid diethylamide (LSD...

  3. Job schedulers for Big data processing in Hadoop environment: testing real-life schedulers using benchmark programs

    Directory of Open Access Journals (Sweden)

    Mohd Usama

    2017-11-01

    Full Text Available At present, big data is very popular, because it has proved to be much successful in many fields such as social media, E-commerce transactions, etc. Big data describes the tools and technologies needed to capture, manage, store, distribute, and analyze petabyte or larger-sized datasets having different structures with high speed. Big data can be structured, unstructured, or semi structured. Hadoop is an open source framework that is used to process large amounts of data in an inexpensive and efficient way, and job scheduling is a key factor for achieving high performance in big data processing. This paper gives an overview of big data and highlights the problems and challenges in big data. It then highlights Hadoop Distributed File System (HDFS, Hadoop MapReduce, and various parameters that affect the performance of job scheduling algorithms in big data such as Job Tracker, Task Tracker, Name Node, Data Node, etc. The primary purpose of this paper is to present a comparative study of job scheduling algorithms along with their experimental results in Hadoop environment. In addition, this paper describes the advantages, disadvantages, features, and drawbacks of various Hadoop job schedulers such as FIFO, Fair, capacity, Deadline Constraints, Delay, LATE, Resource Aware, etc, and provides a comparative study among these schedulers.

  4. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  5. Utilization Bound of Non-preemptive Fixed Priority Schedulers

    Science.gov (United States)

    Park, Moonju; Chae, Jinseok

    It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.

  6. Fault Sample Generation for Virtual Testability Demonstration Test Subject to Minimal Maintenance and Scheduled Replacement

    Directory of Open Access Journals (Sweden)

    Yong Zhang

    2015-01-01

    Full Text Available Virtual testability demonstration test brings new requirements to the fault sample generation. First, fault occurrence process is described by stochastic process theory. It is discussed that fault occurrence process subject to minimal repair is nonhomogeneous Poisson process (NHPP. Second, the interarrival time distribution function of the next fault event is proposed and three typical kinds of parameterized NHPP are discussed. Third, the procedure of fault sample generation is put forward with the assumptions of minimal maintenance and scheduled replacement. The fault modes and their occurrence time subject to specified conditions and time period can be obtained. Finally, an antenna driving subsystem in automatic pointing and tracking platform is taken as a case to illustrate the proposed method. Results indicate that both the size and structure of the fault samples generated by the proposed method are reasonable and effective. The proposed method can be applied to virtual testability demonstration test well.

  7. Overview of planning process at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Gadeken, A.D.

    1986-03-01

    The planning process at the Fast Flux Test Facility (FFTF) is controlled through a hierarchy of documents ranging from a ten-year strategic plan to a weekly schedule. Within the hierarchy are a Near-Term (three-year) Operating Plan, a Cycle (six-month) Plan, and an Outage/Operating Phase Schedule. Coordination of the planning process is accomplished by a dedicated preparation team that also provides an overview of the formal planning timetable which identifies key action items required to be completed before an outage/operating phase can begin

  8. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  9. Three hybridization models based on local search scheme for job shop scheduling problem

    Science.gov (United States)

    Balbi Fraga, Tatiana

    2015-05-01

    This work presents three different hybridization models based on the general schema of Local Search Heuristics, named Hybrid Successive Application, Hybrid Neighborhood, and Hybrid Improved Neighborhood. Despite similar approaches might have already been presented in the literature in other contexts, in this work these models are applied to analyzes the solution of the job shop scheduling problem, with the heuristics Taboo Search and Particle Swarm Optimization. Besides, we investigate some aspects that must be considered in order to achieve better solutions than those obtained by the original heuristics. The results demonstrate that the algorithms derived from these three hybrid models are more robust than the original algorithms and able to get better results than those found by the single Taboo Search.

  10. Energy-driven scheduling algorithm for nanosatellite energy harvesting maximization

    Science.gov (United States)

    Slongo, L. K.; Martínez, S. V.; Eiterer, B. V. B.; Pereira, T. G.; Bezerra, E. A.; Paiva, K. V.

    2018-06-01

    The number of tasks that a satellite may execute in orbit is strongly related to the amount of energy its Electrical Power System (EPS) is able to harvest and to store. The manner the stored energy is distributed within the satellite has also a great impact on the CubeSat's overall efficiency. Most CubeSat's EPS do not prioritize energy constraints in their formulation. Unlike that, this work proposes an innovative energy-driven scheduling algorithm based on energy harvesting maximization policy. The energy harvesting circuit is mathematically modeled and the solar panel I-V curves are presented for different temperature and irradiance levels. Considering the models and simulations, the scheduling algorithm is designed to keep solar panels working close to their maximum power point by triggering tasks in the appropriate form. Tasks execution affects battery voltage, which is coupled to the solar panels through a protection circuit. A software based Perturb and Observe strategy allows defining the tasks to be triggered. The scheduling algorithm is tested in FloripaSat, which is an 1U CubeSat. A test apparatus is proposed to emulate solar irradiance variation, considering the satellite movement around the Earth. Tests have been conducted to show that the scheduling algorithm improves the CubeSat energy harvesting capability by 4.48% in a three orbit experiment and up to 8.46% in a single orbit cycle in comparison with the CubeSat operating without the scheduling algorithm.

  11. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  12. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  13. A Three-Stage Optimization Algorithm for the Stochastic Parallel Machine Scheduling Problem with Adjustable Production Rates

    Directory of Open Access Journals (Sweden)

    Rui Zhang

    2013-01-01

    Full Text Available We consider a parallel machine scheduling problem with random processing/setup times and adjustable production rates. The objective functions to be minimized consist of two parts; the first part is related with the due date performance (i.e., the tardiness of the jobs, while the second part is related with the setting of machine speeds. Therefore, the decision variables include both the production schedule (sequences of jobs and the production rate of each machine. The optimization process, however, is significantly complicated by the stochastic factors in the manufacturing system. To address the difficulty, a simulation-based three-stage optimization framework is presented in this paper for high-quality robust solutions to the integrated scheduling problem. The first stage (crude optimization is featured by the ordinal optimization theory, the second stage (finer optimization is implemented with a metaheuristic called differential evolution, and the third stage (fine-tuning is characterized by a perturbation-based local search. Finally, computational experiments are conducted to verify the effectiveness of the proposed approach. Sensitivity analysis and practical implications are also discussed.

  14. The accelerated hepatitis B virus vaccination schedule among hemodialysis patients, does it work? A randomized controlled trial.

    Science.gov (United States)

    Imam, Mahmoud Hamada

    2017-12-01

    Hemodialysis patients possess particular attributes which increase the susceptibility to hepatitis B virus (HBV) infections. HBV vaccination significantly decreased the number of new HBV-infected patients. However, the conventional vaccination schedule requires a 6-months duration. This study aimed to examine the efficacy the accelerated vaccination schedule among hemodialysis patients. In this study, 202 consecutive hemodialysis patients at New Jeddah hospital were enrolled. The inclusion criteria were: (1) age was above 18 years, (2) all patients had undetectable HBV surface antigen and antibody. Exclusion criteria included: (1) patient had a positive serum HBV surface antigen and antibody using enzyme-linked immunosorbent assay; (2) patient received a previous course of HBV vaccine, (3) patient who was pregnant. Patients were sequentially randomized to receive either Hepatitis B recombinant DNA vaccine (conventional schedule) or to receive combined hepatitis A and B vaccine injection (accelerated schedule). Testing for HBV surface antibodies was done one and three months after completion of the dosage schedule. The primary outcome was the proportion of seroprotection (defined by serum HBV surface antibodies ≥ 10 mIU/ml). Adverse reactions were evaluated regarding both fever and post-injection pain scale. Patients' age ranged from 18 to 71 years.After 1 and 3 months of completion of the vaccination schedule, there was no statistical difference in the proportion of seroprotected patients among both groups. Accelerated vaccination schedule using combined hepatitis A and B vaccine may be beneficial for HBV seroprotection among hemodialysis patients.

  15. Detailed leak detection test plan and schedule for Oak Ridge National Laboratory liquid low-level waste active tanks

    International Nuclear Information System (INIS)

    1995-01-01

    This document provides a plan and schedule for leak testing a portion of the Liquid Low-Level Waste (LLLW) system at the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. It is a concise version of a more general leak testing plan that was prepared in response to the requirements of the Federal Facility Agreement (FFA) for the Oak Ridge Reservation (ORR). This plan includes a schedule for the initial reporting of the leak test results from the various tanks that will be tested. The FFA distinguishes four categories of tank and pipeline systems: new systems (Category A), doubly contained systems (Category B), singly contained systems (Category C), and inactive systems (Category D). The FFA specifically requires leak testing of the Category C systems; there are 14 such tanks addressed in this plan, plus one tank (W-12) that has been temporarily returned to service based on EPA and TDEC concurrence. A schedule for testing these tanks is also included. The plan and schedule also addresses an additional 15 Category B tanks have been demonstrated to meet secondary containment requirements. While these 15 tanks are addressed in this plan for the sake of completeness, they have been removed from the leak testing program based on the design demonstrations that show secondary containment. It is noted that the general plan included 42 tanks. Since that report was issued, 26 of those tanks have passed secondary containment design demonstrations and subsequently have been removed from this leak testing plan. In addition, one tank (LA-104) has been removed from service. Accordingly, this document addresses 15 of the LLLW tanks in the system; plans for testing the pipelines will be described in a separate document

  16. Detailed leak detection test plan and schedule for Oak Ridge National Laboratory liquid low-level waste active tanks

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    This document provides a plan and schedule for leak testing a portion of the Liquid Low-Level Waste (LLLW) system at the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. It is a concise version of a more general leak testing plan that was prepared in response to the requirements of the Federal Facility Agreement (FFA) for the Oak Ridge Reservation (ORR). This plan includes a schedule for the initial reporting of the leak test results from the various tanks that will be tested. The FFA distinguishes four categories of tank and pipeline systems: new systems (Category A), doubly contained systems (Category B), singly contained systems (Category C), and inactive systems (Category D). The FFA specifically requires leak testing of the Category C systems; there are 14 such tanks addressed in this plan, plus one tank (W-12) that has been temporarily returned to service based on EPA and TDEC concurrence. A schedule for testing these tanks is also included. The plan and schedule also addresses an additional 15 Category B tanks have been demonstrated to meet secondary containment requirements. While these 15 tanks are addressed in this plan for the sake of completeness, they have been removed from the leak testing program based on the design demonstrations that show secondary containment. It is noted that the general plan included 42 tanks. Since that report was issued, 26 of those tanks have passed secondary containment design demonstrations and subsequently have been removed from this leak testing plan. In addition, one tank (LA-104) has been removed from service. Accordingly, this document addresses 15 of the LLLW tanks in the system; plans for testing the pipelines will be described in a separate document.

  17. 78 FR 13380 - Silicomanganese From India, Kazakhstan, and Venezuela; Scheduling of Full Five-Year Reviews...

    Science.gov (United States)

    2013-02-27

    ... From India, Kazakhstan, and Venezuela; Scheduling of Full Five-Year Reviews Concerning the Antidumping Duty Orders on Silicomanganese From India, Kazakhstan, and Venezuela AGENCY: United States..., Kazakhstan, and Venezuela would be likely to lead to continuation or recurrence of material injury within a...

  18. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  19. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  20. The bases for optimisation of scheduled repairs and tests of safety systems to improve the NPP productive efficiency

    International Nuclear Information System (INIS)

    Bilej, D.V.; Vasil'chenko, S.V.; Vlasenko, N.I.; Vasil'chenko, V.N.; Skalozubov, V.I.

    2004-01-01

    In the frames of risk-informed approaches the paper proposed the theoretical bases for methods of optimisation of scheduled repairs and tests of safety systems at nuclear power plants. The optimisation criterion is the objective risk function minimising. This function depends on the scheduled repairs/tests periodicity and the allowed time to bring the system channel to a state of non-operability. The main optimisation direct is to reduce the repair time with the purpose of enhancement of productive efficiency

  1. Financial Audit: Bureau of the Public Debt's Fiscal Years 2001 and 2000 Schedules of Federal Debt

    National Research Council Canada - National Science Library

    2002-01-01

    The accompanying auditor's report presents the results of our audits of the Schedules of Federal Debt Managed by the Bureau of the Public Debt for the fiscal years ended September 30, 2001 and 2000...

  2. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  3. A Single-Machine Two-Agent Scheduling Problem by a Branch-and-Bound and Three Simulated Annealing Algorithms

    Directory of Open Access Journals (Sweden)

    Shangchia Liu

    2015-01-01

    Full Text Available In the field of distributed decision making, different agents share a common processing resource, and each agent wants to minimize a cost function depending on its jobs only. These issues arise in different application contexts, including real-time systems, integrated service networks, industrial districts, and telecommunication systems. Motivated by its importance on practical applications, we consider two-agent scheduling on a single machine where the objective is to minimize the total completion time of the jobs of the first agent with the restriction that an upper bound is allowed the total completion time of the jobs for the second agent. For solving the proposed problem, a branch-and-bound and three simulated annealing algorithms are developed for the optimal solution, respectively. In addition, the extensive computational experiments are also conducted to test the performance of the algorithms.

  4. Short term economic emission power scheduling of hydrothermal energy systems using improved water cycle algorithm

    International Nuclear Information System (INIS)

    Haroon, S.S.; Malik, T.N.

    2017-01-01

    Due to the increasing environmental concerns, the demand of clean and green energy and concern of atmospheric pollution is increasing. Hence, the power utilities are forced to limit their emissions within the prescribed limits. Therefore, the minimization of fuel cost as well as exhaust gas emissions is becoming an important and challenging task in the short-term scheduling of hydro-thermal energy systems. This paper proposes a novel algorithm known as WCA-ER (Water Cycle Algorithm with Evaporation Rate) to inspect the short term EEPSHES (Economic Emission Power Scheduling of Hydrothermal Energy Systems). WCA has its ancestries from the natural hydrologic cycle i.e. the raining process forms streams and these streams start flowing towards the rivers which finally flow towards the sea. The worth of WCA-ER has been tested on the standard economic emission power scheduling of hydrothermal energy test system consisting of four hydropower and three thermal plants. The problem has been investigated for the three case studies (i) ECS (Economic Cost Scheduling), (ii) ES (Economic Emission Scheduling) and (iii) ECES (Economic Cost and Emission Scheduling). The results obtained show that WCA-ER is superior to many other methods in the literature in bringing lower fuel cost and emissions. (author)

  5. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  6. Further Examination of the Reliability of the Modified Rathus Assertiveness Schedule.

    Science.gov (United States)

    Del Greco, Linda; And Others

    1986-01-01

    Examined the reliability of the 30-item Modified Rathus Assertiveness Schedule (MRAS) using the test-retest method over a three-week period. The MRAS yielded correlations of .74 using the Pearson product and Spearman Brown correlation coefficient. Correlations for males yielded .77 and .72. For females correlations for both tests were .72.…

  7. Detailed leak detection test plan and schedule for the Oak Ridge National Laboratory LLLW active pipelines

    International Nuclear Information System (INIS)

    Douglas, D.G.; Starr, J.W.; Juliano, T.M.; Maresca, J.W. Jr.

    1993-09-01

    This document provides a detailed leak detection test plan and schedule for leak testing many of the pipelines that comprise the active portion of the liquid low-level waste (LLLW) system at the Oak Ridge National Laboratory (ORNL). This plan was prepared in response to the requirements of the Federal Facility Agreement (FFA) between the US Department of Energy (DOE) and two other agencies, the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC). The LLLW system is an interconnected complex of tanks and pipelines. The FFA distinguishes four categories of tank and pipeline systems within this complex: new systems (Category A), doubly contained systems (Category B), singly contained systems (Category C), and inactive systems (Category D). The FFA specifically requires leak testing of the Category C systems. This plan and schedule addresses leak testing of the Category C pipelines and those doubly contained pipelines that do not fully meet the requirements for secondary containment as listed in the FFA

  8. Traditional/Block Scheduling, Gender, and Test Scores in College Biology Course

    Science.gov (United States)

    Huelskamp, Diana

    2014-01-01

    Block scheduling is the reallocation of a school day into longer class sessions to allow for more active teaching strategies and active engagement of students, in the effort to increase student performance. Various types of block scheduling exist. Traditional scheduling is when the school day is divided into six to eight sessions, with each…

  9. Physician satisfaction with a multi-platform digital scheduling system.

    Directory of Open Access Journals (Sweden)

    Rodrigo Octávio Deliberato

    Full Text Available Physician shift schedules are regularly created manually, using paper or a shared online spreadsheet. Mistakes are not unusual, leading to last minute scrambles to cover a shift. We developed a web-based shift scheduling system and a mobile application tool to facilitate both the monthly scheduling and shift exchanges between physicians. The primary objective was to compare physician satisfaction before and after the mobile application implementation.Over a 9-month period, three surveys, using the 4-point Likert type scale were performed to assess the physician satisfaction. The first survey was conducted three months prior mobile application release, a second survey three months after implementation and the last survey six months after.51 (77% of the physicians answered the baseline survey. Of those, 32 (63% were males with a mean age of 37.8 ± 5.5 years. Prior to the mobile application implementation, 36 (70% of the responders were using more than one method to carry out shift exchanges and only 20 (40% were using the official department report sheet to document shift exchanges. The second and third survey were answered by 48 (73% physicians. Forty-eight (98% of them found the mobile application easy or very easy to install and 47 (96% did not want to go back to the previous method. Regarding physician satisfaction, at baseline 37% of the physicians were unsatisfied or very unsatisfied with shift scheduling. After the mobile application was implementation, only 4% reported being unsatisfied (OR = 0.11, p < 0.001. The satisfaction level improved from 63% to 96% between the first and the last survey. Satisfaction levels significantly increased between the three time points (OR = 13.33, p < 0.001.Our web and mobile phone-based scheduling system resulted in better physician satisfaction.

  10. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  11. Annual spatiotemporal migration schedules in three larger insectivorous birds

    DEFF Research Database (Denmark)

    Jacobsen, Lars Bo; Jensen, Niels Odder; Willemoes, Mikkel

    2017-01-01

    Background: Knowledge of spatiotemporal migration patterns is important for our understanding of migration ecology and ultimately conservation of migratory species. We studied the annual migration schedules of European nightjar, a large nocturnal insectivore and compared it with two other larger ...

  12. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  13. A three-stage heuristic for harvest scheduling with access road network development

    Science.gov (United States)

    Mark M. Clark; Russell D. Meller; Timothy P. McDonald

    2000-01-01

    In this article we present a new model for the scheduling of forest harvesting with spatial and temporal constraints. Our approach is unique in that we incorporate access road network development into the harvest scheduling selection process. Due to the difficulty of solving the problem optimally, we develop a heuristic that consists of a solution construction stage...

  14. Advisory Committee on Immunization Practices Recommended Immunization Schedule for Adults Aged 19 Years or Older - United States, 2018.

    Science.gov (United States)

    Kim, David K; Riley, Laura E; Hunter, Paul

    2018-02-09

    In October 2017, the Advisory Committee on Immunization Practices (ACIP) voted to approve the Recommended Immunization Schedule for Adults Aged 19 Years or Older, United States, 2018. The 2018 adult immunization schedule summarizes ACIP recommendations in two figures and a table of contraindications and precautions for vaccines recommended for adults, and is intended is to assist health care providers in implementing the current ACIP recommendations for vaccinating adults. The schedule can be found at https://www.cdc.gov/vaccines/schedules.* The full ACIP recommendations for each vaccine are available at https://www.cdc.gov/vaccines/hcp/acip-recs/index.html. The 2018 adult immunization schedule has also been approved by the American College of Physicians (https://www.acponline.org), the American Academy of Family Physicians (https://www.aafp.org), the American College of Obstetricians and Gynecologists (https://www.acog.org), and the American College of Nurse-Midwives (http://www.midwife.org). The ACIP-recommended use of each vaccine is developed after an in-depth review of vaccine-related data, including data on disease epidemiology, vaccine efficacy and effectiveness, vaccine safety, feasibility of program implementation, and economic aspects of immunization policy (1).

  15. The impact of a scheduling change on ninth grade high school performance on biology benchmark exams and the California Standards Test

    Science.gov (United States)

    Leonardi, Marcelo

    The primary purpose of this study was to examine the impact of a scheduling change from a trimester 4x4 block schedule to a modified hybrid schedule on student achievement in ninth grade biology courses. This study examined the impact of the scheduling change on student achievement through teacher created benchmark assessments in Genetics, DNA, and Evolution and on the California Standardized Test in Biology. The secondary purpose of this study examined the ninth grade biology teacher perceptions of ninth grade biology student achievement. Using a mixed methods research approach, data was collected both quantitatively and qualitatively as aligned to research questions. Quantitative methods included gathering data from departmental benchmark exams and California Standardized Test in Biology and conducting multiple analysis of covariance and analysis of covariance to determine significance differences. Qualitative methods include journal entries questions and focus group interviews. The results revealed a statistically significant increase in scores on both the DNA and Evolution benchmark exams. DNA and Evolution benchmark exams showed significant improvements from a change in scheduling format. The scheduling change was responsible for 1.5% of the increase in DNA benchmark scores and 2% of the increase in Evolution benchmark scores. The results revealed a statistically significant decrease in scores on the Genetics Benchmark exam as a result of the scheduling change. The scheduling change was responsible for 1% of the decrease in Genetics benchmark scores. The results also revealed a statistically significant increase in scores on the CST Biology exam. The scheduling change was responsible for .7% of the increase in CST Biology scores. Results of the focus group discussions indicated that all teachers preferred the modified hybrid schedule over the trimester schedule and that it improved student achievement.

  16. Chaotic Multiobjective Evolutionary Algorithm Based on Decomposition for Test Task Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Hui Lu

    2014-01-01

    Full Text Available Test task scheduling problem (TTSP is a complex optimization problem and has many local optima. In this paper, a hybrid chaotic multiobjective evolutionary algorithm based on decomposition (CMOEA/D is presented to avoid becoming trapped in local optima and to obtain high quality solutions. First, we propose an improving integrated encoding scheme (IES to increase the efficiency. Then ten chaotic maps are applied into the multiobjective evolutionary algorithm based on decomposition (MOEA/D in three phases, that is, initial population and crossover and mutation operators. To identify a good approach for hybrid MOEA/D and chaos and indicate the effectiveness of the improving IES several experiments are performed. The Pareto front and the statistical results demonstrate that different chaotic maps in different phases have different effects for solving the TTSP especially the circle map and ICMIC map. The similarity degree of distribution between chaotic maps and the problem is a very essential factor for the application of chaotic maps. In addition, the experiments of comparisons of CMOEA/D and variable neighborhood MOEA/D (VNM indicate that our algorithm has the best performance in solving the TTSP.

  17. 76 FR 64107 - Uranium From Russia; Scheduling of an Expedited Five-Year Review Concerning the Suspended...

    Science.gov (United States)

    2011-10-17

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-539-C; Third Review] Uranium From Russia; Scheduling of an Expedited Five-Year Review Concerning the Suspended Investigation on Uranium From Russia... on uranium from Russia would be likely to lead to continuation or recurrence of material injury...

  18. A Multi-Verse Optimizer with Levy Flights for Numerical Optimization and Its Application in Test Scheduling for Network-on-Chip.

    Directory of Open Access Journals (Sweden)

    Cong Hu

    Full Text Available We propose a new meta-heuristic algorithm named Levy flights multi-verse optimizer (LFMVO, which incorporates Levy flights into multi-verse optimizer (MVO algorithm to solve numerical and engineering optimization problems. The Original MVO easily falls into stagnation when wormholes stochastically re-span a number of universes (solutions around the best universe achieved over the course of iterations. Since Levy flights are superior in exploring unknown, large-scale search space, they are integrated into the previous best universe to force MVO out of stagnation. We test this method on three sets of 23 well-known benchmark test functions and an NP complete problem of test scheduling for Network-on-Chip (NoC. Experimental results prove that the proposed LFMVO is more competitive than its peers in both the quality of the resulting solutions and convergence speed.

  19. 77 FR 6582 - Ferrovanadium and Nitrided Vanadium From Russia; Scheduling of a Full Five-Year Review

    Science.gov (United States)

    2012-02-08

    ... Nitrided Vanadium From Russia; Scheduling of a Full Five-Year Review AGENCY: United States International... Russia would be likely to lead to continuation or recurrence of material injury within a reasonably foreseeable time. For further information concerning the conduct of this review and rules of general...

  20. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  1. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  2. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  3. ICPP tank farm closure study. Volume III: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the six options described in Volume 1, Section 2: Option 1 -- Total removal clean closure; No subsequent use; Option 2 -- Risk-based clean closure; LLW fill; Option 3 -- Risk-based clean closure; CERCLA fill; Option 4 -- Close to RCRA landfill standards; LLW fill; Option 5 -- Close to RCRA landfill standards; CERCLA fill; and Option 6 -- Close to RCRA landfill standards; Clean fill. This volume is divided into two portions. The first portion contains the cost and planning schedule estimates while the second portion contains life-cycle costs and yearly cash flow information for each option

  4. Recommended Immunization Schedules for Persons Aged 0 through 18 Years--United States, 2010. Morbidity and Mortality Weekly Report QuickGuide. Volume 58, Number 51 & 52

    Science.gov (United States)

    Centers for Disease Control and Prevention, 2010

    2010-01-01

    The Advisory Committee on Immunization Practices (ACIP) annually publishes an immunization schedule for persons aged 0 through 18 years that summarizes recommendations for currently licensed vaccines for children aged 18 years and younger and includes recommendations in effect as of December 15, 2009. The changes to the previous schedule are…

  5. Safety, Quality, Schedule: the motto of LS1

    CERN Multimedia

    2013-01-01

    The LHC’s first long shutdown, LS1, is a marathon that began on 16 February and will take us through to the beginning of 2015. Just as Olympic marathon runners have a motto, Citius, Altius, Fortius, so the athletes of LS1 work to the mantra of Safety, Quality, Schedule. Four months into LS1, they have settled into their rhythm, and things are going to plan.   The first task of LS1 was to bring the LHC up to room temperature - this was achieved in just 10 weeks. In parallel, preliminary tests for electrical quality assurance and leaks revealed essentially the level of wear and tear we’d expect after three years of running. One slightly anxious moment came when we looked at the RF fingers – the devices that ensure electrical contact in the beam pipes as they pass from one magnet to the next. Those of you with long memories will recall that before start-up, some of these got damaged at warm-up. The good news today is that with all eight sectors test...

  6. Brief-stimulus presentations on multiform tandem schedules

    OpenAIRE

    Reed, Phil

    1994-01-01

    Three experiments examined the influence of a brief stimulus (a light) on the behavior of food-deprived rats whose lever pressing on tandem schedules comprising components of different schedule types resulted in food presentation. In Experiment 1, either a tandem variable-ratio variable-interval or a tandem variable-interval variable-ratio schedule was used. The variable-interval requirement in the tandem variable-ratio variable-interval schedule was yoked to the time taken to complete the va...

  7. FFTF and Advanced Reactors Transition Program Resource Loaded Schedule

    Energy Technology Data Exchange (ETDEWEB)

    GANTT, D.A.

    2000-10-31

    This Resource Load Schedule (RLS) addresses two missions. The Advanced Reactors Transition (ART) mission, funded by DOE-EM, is to transition assigned, surplus facilities to a safe and compliant, low-cost, stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D&D. Facilities to be transitioned include the 309 Building Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy Legacy facilities. This mission is funded through the Environmental Management (EM) Project Baseline Summary (PBS) RL-TP11, ''Advanced Reactors Transition.'' The second mission, the Fast Flux Test Facility (FFTF) Project, is funded through budget requests submitted to the Office of Nuclear Energy, Science and Technology (DOE-NE). The FFTF Project mission is maintaining the FFTF, the Fuels and Materials Examination Facility (FMEF), and affiliated 400 Area buildings in a safe and compliant standby condition. This mission is to preserve the condition of the plant hardware, software, and personnel in a manner not to preclude a plant restart. This revision of the Resource Loaded Schedule (RLS) is based upon the technical scope in the latest revision of the following project and management plans: Fast Flux Test Facility Standby Plan (Reference 1); Hanford Site Sodium Management Plan (Reference 2); and 309 Building Transition Plan (Reference 4). The technical scope, cost, and schedule baseline is also in agreement with the concurrent revision to the ART Fiscal Year (FY) 2001 Multi-Year Work Plan (MYWP), which is available in an electronic version (only) on the Hanford Local Area Network, within the ''Hanford Data Integrator (HANDI)'' application.

  8. Pittsburgh International Airport - March 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  9. Pittsburgh International Airport - April 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  10. Pittsburgh International Airport - January 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  11. Pittsburgh International Airport - February 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  12. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  13. 78 FR 9937 - Certain Pasta From Italy and Turkey Scheduling of Full Five-Year Reviews Concerning the...

    Science.gov (United States)

    2013-02-12

    ...)] Certain Pasta From Italy and Turkey Scheduling of Full Five-Year Reviews Concerning the Countervailing and Antidumping Duty Orders on Certain Pasta From Italy and Turkey AGENCY: United States International Trade... whether revocation of the countervailing and antidumping duty orders on certain pasta from Italy and...

  14. 76 FR 43344 - Certain Orange Juice From Brazil; Scheduling of a Full Five-Year Review Concerning the...

    Science.gov (United States)

    2011-07-20

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1089 (Review)] Certain Orange Juice From Brazil; Scheduling of a Full Five-Year Review Concerning the Antidumping Duty Order on Certain Orange... order on certain orange juice from Brazil would be likely to lead to continuation or recurrence of...

  15. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  16. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  17. 76 FR 23835 - Solid Urea From Russia and Ukraine; Scheduling of Full Five-Year Reviews Concerning the...

    Science.gov (United States)

    2011-04-28

    ... Urea From Russia and Ukraine; Scheduling of Full Five-Year Reviews Concerning the Antidumping Duty Orders on Solid Urea From Russia and Ukraine AGENCY: United States International Trade Commission. ACTION... of the antidumping duty orders on solid urea from Russia and Ukraine would be likely to lead to...

  18. 76 FR 31360 - Paper Clips From China; Scheduling of an Expedited Five-Year Review Concerning the Antidumping...

    Science.gov (United States)

    2011-05-31

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-663 Third Review] Paper Clips From China; Scheduling of an Expedited Five-Year Review Concerning the Antidumping Duty Order on Paper Clips From China... paper clips from China would be likely to lead to continuation or recurrence of material injury within a...

  19. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  20. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  1. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  2. Scheduling system for test automation framework

    NARCIS (Netherlands)

    Wahyudi, Djohan

    2014-01-01

    An Interventional X-ray (iXR) system provides real time X-ray imaging with high image clarity and low X-ray dose. After several years of development, the iXR System has become complex. In order to verify the correct operation of the system, the system integration and test group performs extensive

  3. 76 FR 50252 - Gray Portland Cement and Cement Clinker From Japan; Scheduling of an Expedited Five-Year Review...

    Science.gov (United States)

    2011-08-12

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-461 (Third Review)] Gray Portland Cement and Cement Clinker From Japan; Scheduling of an Expedited Five-Year Review Concerning the Antidumping Duty Order on Gray Portland Cement and Cement Clinker From Japan AGENCY: United States International...

  4. Applying mathematical models to predict resident physician performance and alertness on traditional and novel work schedules.

    Science.gov (United States)

    Klerman, Elizabeth B; Beckett, Scott A; Landrigan, Christopher P

    2016-09-13

    In 2011 the U.S. Accreditation Council for Graduate Medical Education began limiting first year resident physicians (interns) to shifts of ≤16 consecutive hours. Controversy persists regarding the effectiveness of this policy for reducing errors and accidents while promoting education and patient care. Using a mathematical model of the effects of circadian rhythms and length of time awake on objective performance and subjective alertness, we quantitatively compared predictions for traditional intern schedules to those that limit work to ≤ 16 consecutive hours. We simulated two traditional schedules and three novel schedules using the mathematical model. The traditional schedules had extended duration work shifts (≥24 h) with overnight work shifts every second shift (including every third night, Q3) or every third shift (including every fourth night, Q4) night; the novel schedules had two different cross-cover (XC) night team schedules (XC-V1 and XC-V2) and a Rapid Cycle Rotation (RCR) schedule. Predicted objective performance and subjective alertness for each work shift were computed for each individual's schedule within a team and then combined for the team as a whole. Our primary outcome was the amount of time within a work shift during which a team's model-predicted objective performance and subjective alertness were lower than that expected after 16 or 24 h of continuous wake in an otherwise rested individual. The model predicted fewer hours with poor performance and alertness, especially during night-time work hours, for all three novel schedules than for either the traditional Q3 or Q4 schedules. Three proposed schedules that eliminate extended shifts may improve performance and alertness compared with traditional Q3 or Q4 schedules. Predicted times of worse performance and alertness were at night, which is also a time when supervision of trainees is lower. Mathematical modeling provides a quantitative comparison approach with potential to aid

  5. Time Trends in Murray's Psychogenic Needs over Three Decades in Swedish 75-Year-Olds.

    Science.gov (United States)

    Billstedt, Eva; Waern, Margda; Falk, Hanna; Duberstein, Paul; Östling, Svante; Hällström, Tore; Skoog, Ingmar

    2017-01-01

    While time trends in personality traits have been suggested in younger cohorts, little is known regarding this issue in older adults. To test for birth cohort changes in psychogenic needs according to Murray's theory of personality in two birth cohorts of 75-year-olds born 1901-1902 and 1930. Two population-based birth cohorts were examined at the age of 75 years in 1976-1977 and in 2005-2006. Psychogenic needs according to Murray were measured with the Cesarec-Marke Personality Schedule (CMPS), a Swedish version of the Edwards Personal Preference Schedule. Scores on the CMPS subscales (achievement, affiliation, aggression, defence of status, guilt feelings, dominance, exhibition, autonomy, nurturance, order, succorance, and acquiescence) were compared between cohorts. Achievement, exhibition, dominance, aggression, affiliation, and succorance scores were higher, and order and acquiescence scores lower, in the more recent birth cohort of 75-year-olds. Women scored lower than men on exhibition and dominance, and higher on defence of status, guilt feelings, affiliation, nurturance, and succorance. Interaction effects between cohort and sex were found for achievement (women scored lower than men in 1976-1977 but not in 2005-2006), order (the lower scores in 2005-2006 were more accentuated among men), and acquiescence (increased in men and decreased in women). The later-born birth cohort scored higher on self-centred traits, such as more dominant, competitive, and exhibitive traits as well as the need to be taken care of and have friends around, but it scored lower on the need for order. The gap between men and women regarding achievement decreased, possibly reflecting women's more prominent role in society. © 2016 S. Karger AG, Basel.

  6. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  7. Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences from the Space Technology 5 Project

    Science.gov (United States)

    Sauerwein, Timothy A.; Gostomski, Thomas

    2008-01-01

    The ST5 technology demonstration mission led by GSFC of NASA's New Millennium Program managed by JPL consisted of three micro satellites (approximately 30 kg each) deployed into orbit from the Pegasus XL launch vehicle. In order to meet the launch date schedule of ST5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center. It was determined that there was insufficient time in the schedule to perform three spacecraft I&T activities in series using standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus had the experience and knowledge to safely execute I&T for spacecraft #2 and #3. The integration team was extremely versatile; each member could perform many different activities or work any spacecraft, when needed. ST5 was successfully integrated, tested and shipped to the launch site per the I&T schedule that was planned three years previously. The I&T campaign was completed with ST5's successful launch on March 22, 2006.

  8. No difference in self reported health among coalminers in two different shift schedules at Spitsbergen, Norway, a two years follow-up.

    Science.gov (United States)

    Hanoa, Rolf; Baste, Valborg; Kooij, Arne; Sommervold, Linda; Moen, Bente Elisabeth

    2011-01-01

    This study was performed among coal miners in the remote location Svea, Spitsbergen. The shift schedule used to be 7 d on and 7 d off. The aim of this study was to investigate possible changes in health after a voluntary implementation of a new shift schedule, with periods of 14 d on and 14 d off, for 74 percent of the workers in 2007. A questionnaire was distributed to all employees before and two times after the new shift schedule, comprising questions on type of work, shift schedule, pain, sleep, stress and coping. Ninety nine percent of the employees responded; 274 in 2006, 307 in 2007 and 312 in 2008. Work neither in the 14/14 shift nor 7/7 shift was related to any change in the health after these two years. The coping index for workers in the 14/14 shift improved.

  9. What Happened to Remote Usability Testing? An Empirical Study of Three Methods

    DEFF Research Database (Denmark)

    Stage, Jan; Andreasen, M. S.; Nielsen, H. V.

    2007-01-01

    The idea of conducting usability tests remotely emerged ten years ago. Since then, it has been studied empirically, and some software organizations employ remote methods. Yet there are still few comparisons involving more than one remote method. This paper presents results from a systematic...... empirical comparison of three methods for remote usability testing and a conventional laboratorybased think-aloud method. The three remote methods are a remote synchronous condition, where testing is conducted in real time but the test monitor is separated spatially from the test subjects, and two remote...

  10. Detailed leak detection test plan and schedule for the Oak Ridge National Laboratory LLLW active tanks

    International Nuclear Information System (INIS)

    Douglas, D.G.; Maresca, J.W. Jr.

    1993-03-01

    This document provides a detailed leak detection test plan and schedule for leak testing many of the tanks that comprise the active portion of the liquid low-level waste (LLLW) system at the Oak Ridge National Laboratory (ORNL). This plan was prepared in response to the requirements of the Federal Facility Agreement (FFA) between the US Department of Energy (DOE) and two other agencies, the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC)

  11. Improved Scheduling Mechanisms for Synchronous Information and Energy Transmission.

    Science.gov (United States)

    Qin, Danyang; Yang, Songxiang; Zhang, Yan; Ma, Jingya; Ding, Qun

    2017-06-09

    Wireless energy collecting technology can effectively reduce the network time overhead and prolong the wireless sensor network (WSN) lifetime. However, the traditional energy collecting technology cannot achieve the balance between ergodic channel capacity and average collected energy. In order to solve the problem of the network transmission efficiency and the limited energy of wireless devices, three improved scheduling mechanisms are proposed: improved signal noise ratio (SNR) scheduling mechanism (IS2M), improved N-SNR scheduling mechanism (INS2M) and an improved Equal Throughput scheduling mechanism (IETSM) for different channel conditions to improve the whole network performance. Meanwhile, the average collected energy of single users and the ergodic channel capacity of three scheduling mechanisms can be obtained through the order statistical theory in Rayleig, Ricean, Nakagami- m and Weibull fading channels. It is concluded that the proposed scheduling mechanisms can achieve better balance between energy collection and data transmission, so as to provide a new solution to realize synchronous information and energy transmission for WSNs.

  12. Tevatron targets three-year extension

    CERN Multimedia

    Harris, Margaret

    2010-01-01

    "Fermilab's Tevatron collider could get a new lease on life following a campaign to keep the facility running beyond the end of 2011, when the rival Large Hadron Collider (LHC) at Cern is scheduled to shut down for 15 months of repairs" (0.75 page)

  13. 77 FR 18861 - Stainless Steel Bar From Brazil, India, Japan, and Spain; Scheduling of Expedited Five-Year Reviews

    Science.gov (United States)

    2012-03-28

    ... INTERNATIONAL TRADE COMMISSION [Investigation Nos. 731-TA-678, 679, 681, and 682 (Third Review)] Stainless Steel Bar From Brazil, India, Japan, and Spain; Scheduling of Expedited Five-Year Reviews AGENCY... stainless steel bar from Brazil, India, Japan, and Spain would be likely to lead to continuation or...

  14. 77 FR 42762 - Scheduling of an Expedited Five-Year Review Concerning the Antidumping Duty Order on Folding Gift...

    Science.gov (United States)

    2012-07-20

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-921 (Second Review)] Scheduling of an Expedited Five-Year Review Concerning the Antidumping Duty Order on Folding Gift Boxes From China AGENCY... folding gift boxes from China would be likely to lead to continuation or recurrence of material injury...

  15. 78 FR 76856 - Silicon Metal From Russia; Scheduling of a Full Five-Year Review Concerning the Antidumping Duty...

    Science.gov (United States)

    2013-12-19

    ... Russia; Scheduling of a Full Five-Year Review Concerning the Antidumping Duty Order on Silicon Metal From Russia AGENCY: United States International Trade Commission. ACTION: Notice. SUMMARY: The Commission... silicon metal from Russia would be likely to lead to continuation or recurrence of material injury within...

  16. Evaluation of the 12-hour shift schedule at the Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Lewis, P.M.; Swaim, D.J.; Rosa, R.R.; Colligan, M.J.; Booth, R.J.; Swint, M.J.

    1986-09-01

    The objective of this report are to evaluate the effect of the change to the 12-hour/day schedule on operational performance and safety of FFTF; to evaluate the degree to which the change to the 12-hour/day schedule has met its objectives; and to gather information that may be useful to FFTF management and the US Department of Energy (DOE) in evaluating 8- and 12-hour shift schedules at other facilities. The principal conclusion of this report is that the 12-hour/day shift schedule is a reasonable alternative to an 8-hour/day schedule at FFTF. As a result of the scedule change, it seems clear that plant performance improved in two ways. The operator error rate in keeping the Technical Specification Compliance Logs was already very low on the 8-hour shift. On the 12-hour shift, the rate was even lower. Also, the operator interface with craft personnel resulted in an increase in the productivity of the craft personnel

  17. Water requirement and irrigation schedule for tomato in northern guinea savanna zone, Nigeria

    Directory of Open Access Journals (Sweden)

    Ibraheem Alhassan

    2015-06-01

    Full Text Available Assessment of water requirement and irrigation schedule for tomato with the support of FAO-CROPWAT simulation model was carried out for Yola, Nigeria with the aim of planning irrigation schedules for tomato and develop recommendations for improve irrigation practices. The climatic data for 2012/2013 and soil properties of the study area were input into the program. Tomato crop properties were updated by the FAO data and three irrigation intervals were tested (7 and 10 days irrigation intervals and irrigation schedule of 10 days interval during initial and development stage and 6 days interval at mid and late season stages of tomato crop. The simulated results analysis for tomato according to the irrigation schedule showed that highest yield reduction of 16.2% was recorded with 10 days irrigation interval treatment and the least of 0.4% with irrigation interval of 10 days at first two growth stages and 6 days at last two stages. FAO-CROPWAT 8.0 can be used in planning proper irrigation schedule for tomato in Yola, Nigeria.

  18. A NEW APPROACH TO CLASS SCHEDULING. FINAL REPORT.

    Science.gov (United States)

    CANTER, JOHN; AND OTHERS

    AN INVESTIGATION OF THE USE OF A PROTOTYPE DEVICE FOR CLASS SCHEDULING WAS MADE. THE BEEKLEY INSITE DEVICE THAT WAS STUDIED USES THE "PEEK-A-BOO" PRINCIPLE OF MATCHING COMPUTER TAPES. A TEST GROUP OF 149 GRADUATE STUDENTS WAS USED. THEIR DESIRED SCHEDULES WERE MATCHED AUTOMATICALLY AGAINST A PROPOSED MASTER SCHEDULE TO EVALUATE THE…

  19. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  20. Parental work schedules and child overweight and obesity.

    Science.gov (United States)

    Champion, S L; Rumbold, A R; Steele, E J; Giles, L C; Davies, M J; Moore, V M

    2012-04-01

    Studies in school-age children have consistently shown a positive association between maternal paid work hours and child obesity. However, there is conflicting evidence about the impact of maternal work hours scheduled at nonstandard times (for example, evenings, nights or weekends), and no previous examination of paternal work schedules and child weight. We examined the associations between maternal, paternal and combined parental paid work schedules and overweight/obesity in children at age 9 years. Data were analysed from the most recent follow-up of 9-year-old children (n=434) in an Australian birth cohort study. Children were measured and classified as overweight/obese using the International Obesity Taskforce body mass index cutoff points. Current working conditions of parents were obtained from a structured interview with the primary caregiver. Logistic regression analyses were used to investigate the effect of parental work schedules on child overweight/obesity with adjustment for a range of sociodemographic and household factors associated with parental employment and child weight. At 9 years of age, 99 children (22.8%) were overweight or obese. When parental work schedules were examined separately, child overweight/obesity was significantly associated with paternal nonstandard work schedules (adjusted odds ratio (OR) 1.97, 95% confidence interval (CI) 1.08-3.61). There was no association with any type of maternal work schedule. We also found an association between child overweight/obesity and circumstances in which both parents worked nonstandard schedules; however, this was of borderline statistical significance in the adjusted models (adjusted OR 2.26, 95% CI 0.99-5.16). Work hours scheduled at nonstandard times, when worked by the father or both parents, were associated with child overweight and obesity. These findings indicate the potential importance of fathers' paid work arrangements for child overweight/obesity, which until recently has largely

  1. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  2. "Creative" Work Schedules.

    Science.gov (United States)

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  3. [Review of the 2016 Swiss immunization schedule and technology update for improving vaccine management].

    Science.gov (United States)

    Diana, Alessandro

    2016-05-11

    The 2016 immunization schedule published by the Swiss Federal Office of Public Health includes three new clauses: reimbursement of the additional Human Papillomavirus (HPV) vaccination in young males (11-26 years) as recommended by local canton programs, the end of franchise exemption for the measles, mumps and rubella (MMR) vaccination, and the creation of a new system of indemnities and moral compensation in the event of personal injury resulting from vaccinations. This article presents the main features of the 2016 immunization schedule with details of the technology available to physicians to improve vaccine management.

  4. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  5. Auditory Training for Adults Who Have Hearing Loss: A Comparison of Spaced Versus Massed Practice Schedules.

    Science.gov (United States)

    Tye-Murray, Nancy; Spehar, Brent; Barcroft, Joe; Sommers, Mitchell

    2017-08-16

    The spacing effect in human memory research refers to situations in which people learn items better when they study items in spaced intervals rather than massed intervals. This investigation was conducted to compare the efficacy of meaning-oriented auditory training when administered with a spaced versus massed practice schedule. Forty-seven adult hearing aid users received 16 hr of auditory training. Participants in a spaced group (mean age = 64.6 years, SD = 14.7) trained twice per week, and participants in a massed group (mean age = 69.6 years, SD = 17.5) trained for 5 consecutive days each week. Participants completed speech perception tests before training, immediately following training, and then 3 months later. In line with transfer appropriate processing theory, tests assessed both trained tasks and an untrained task. Auditory training improved the speech recognition performance of participants in both groups. Benefits were maintained for 3 months. No effect of practice schedule was found on overall benefits achieved, on retention of benefits, nor on generalizability of benefits to nontrained tasks. The lack of spacing effect in otherwise effective auditory training suggests that perceptual learning may be subject to different influences than are other types of learning, such as vocabulary learning. Hence, clinicians might have latitude in recommending training schedules to accommodate patients' schedules.

  6. 76 FR 77013 - Tin- and Chromium-Coated Steel Sheet From Japan; Scheduling of a Full Five-Year Review Concerning...

    Science.gov (United States)

    2011-12-09

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-860 (Second Review)] Tin- and Chromium-Coated Steel Sheet From Japan; Scheduling of a Full Five-Year Review Concerning the Antidumping Duty... order on tin- and chromium-coated steel sheet from Japan would be likely to lead to continuation or...

  7. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  8. Concurrent processes scheduling with scarce resources in small and medium enterprises

    Institute of Scientific and Technical Information of China (English)

    马嵩华

    2016-01-01

    Scarce resources , precedence and non-determined time-lag are three constraints commonly found in small and medium manufacturing enterprises (SMEs), which are deemed to block the ap-plication of workflow management system ( WfMS ) .To tackle this problem , a workflow scheduling approach is proposed based on timing workflow net (TWF-net) and genetic algorithm (GA).The workflow is modelled in a form of TWF-net in favour of process simulation and resource conflict checking .After simplifying and reconstructing the set of workflow instance , the conflict resolution problem is transformed into a resource-constrained project scheduling problem ( RCPSP ) , which could be efficiently solved by a heuristic method , such as GA.Finally, problems of various sizes are utilized to test the performance of the proposed algorithm and to compare it with first-come-first-served ( FCFS) strategy.The evaluation demonstrates that the proposed method is an overwhelming and effective approach for scheduling the concurrent processes with precedence and resource con -straints .

  9. Environmental monitoring master sampling schedule, January--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1990-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1990 for the Environment Surveillance and Ground-Water Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This schedule includes ground-water sampling performed by PNL for environmental surveillance of the Hanford Site.

  10. Detailed Leak Detection Test Plan and schedule for the Oak Ridge National Laboratory liquid low-level waste active pipelines

    International Nuclear Information System (INIS)

    1994-08-01

    This document provides a detailed leak detection test plan and schedule for the pipelines that comprise the active, singly contained, portion of the liquid low-level waste (LLLW) system at the Oak Ridge National Laboratory (ORNL). This plan was prepared in response to the requirements of the Federal Facility Agreement for the Oak Ridge Reservation (FFA) between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC). The LLLW system is an interconnected complex of tanks and pipelines. The FFA distinguishes four categories of tank and pipeline systems within this complex: new or replacement tank systems with secondary containment (Category A), existing tank systems with secondary containment (Category B), existing tank systems without secondary containment (Category C), and tank systems that have been removed from service (Category D). The FFA specifically requires that DOE demonstrate that the Category C systems are not leaking. This plan and schedule addresses testing of the Category C pipelines and the pipelines which are part of Category B tank systems that do not fully meet the requirements for secondary containment as listed in the FFA. A key feature of the plan is that it is based on the use of performance standards for the conduct of release detection testing, and on the use of methods whose performance has been evaluated and shown to meet those standards. Another feature of the plan is that it is based in part on relevant portions of current federal EPA regulations applicable to underground storage tanks and pipelines (UST systems) that store and transfer petroleum products and other hazardous substances. While the FFA does not require that the testing at ORNL follow these regulations, the regulations do provide industry- and regulator-accepted performance standards, as well as a schedule for repeated testing of UST components

  11. The robust schedule - A link to improved workflow

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    -down the contractors, and force them to rigorously adhere to the initial schedule. If delayed the work-pace or manpower has to be increased to observe the schedule. In attempt to improve productivity three independent site-mangers have been interviewed about time-scheduling. Their experiences and opinions have been...... analyzed and weaknesses in existing time scheduling have been found. The findings showed a negative side effect of keeping the schedule to tight. A too tight schedule is inflexible and cannot absorb variability in production. Flexibility is necessary because of the contractors interacting and dependable....... The result is a chaotic, complex and uncontrolled construction site. Furthermore, strict time limits entail the workflow to be optimized under non-optimal conditions. Even though productivity seems to be increasing, productivity per man-hour is decreasing resulting in increased cost. To increase productivity...

  12. Environmental monitoring master sampling schedule: January--December 1989

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1989-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1989 for the Surface and Ground-Water Environmental Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. This schedule includes routine ground-water sampling performed by PNL for Westinghouse Hanford Company, but does not include samples that may be collected in 1989 to support special studies or special contractor projects, or for quality control. The sampling schedule for Site-wide chemical monitoring is not included here, because it varies each quarter as needed, based on past results and operating needs. This schedule does not include Resource Conservation and Recovery Act ground-water sampling performed by PNL for Hanford Site contractors, nor does it include sampling that may be done by other DOE Hanford contractors

  13. The impact of exposure to shift-based schedules on medical students

    Directory of Open Access Journals (Sweden)

    David A. Williams

    2015-06-01

    Full Text Available Background: With new resident duty-hour regulations, resident work schedules have progressively transitioned towards shift-based systems, sometimes resulting in increased team fragmentation. We hypothesized that exposure to shift-based schedules and subsequent team fragmentation would negatively affect medical student experiences during their third-year internal medicine clerkship. Design: As part of a larger national study on duty-hour reform, 67 of 150 eligible third-year medical students completed surveys about career choice, teaching and supervision, assessment, patient care, well-being, and attractiveness of a career in internal medicine after completing their internal medicine clerkship. Students who rotated to hospitals with shift-based systems were compared to those who did not. Non-demographic variables used a five-point Likert scale. Chi-squared and Fisher's exact tests were used to assess the relationships between exposure to shift-based schedules and student responses. Questions with univariate p≤0.1 were included in multivariable logistic regression models. Results: Thirty-six students (54% were exposed to shift-based schedules. Students exposed to shift-based schedules were less likely to perceive that their attendings were committed to teaching (odds ratio [OR] 0.35, 95% confidence interval [CI]: 0.13–0.90, p=0.01 or perceive that residents had sufficient exposure to assess their performance (OR 0.29, 95% CI: 0.09–0.91, p=0.03. However, those students were more likely to feel their interns were able to observe them at the bedside (OR 1.89, 95% CI: 1.08–3.13, p=0.02 and had sufficient exposure to assess their performance (OR 3.00, 95% CI: 1.01–8.86, p=0.05. Conclusions: These findings suggest that shift-based schedules designed in response to duty-hour reform may have important broader implications for the teaching environment.

  14. The impact of exposure to shift-based schedules on medical students.

    Science.gov (United States)

    Williams, David A; Kogan, Jennifer R; Hauer, Karen E; Yamashita, Traci; Aagaard, Eva M

    2015-01-01

    With new resident duty-hour regulations, resident work schedules have progressively transitioned towards shift-based systems, sometimes resulting in increased team fragmentation. We hypothesized that exposure to shift-based schedules and subsequent team fragmentation would negatively affect medical student experiences during their third-year internal medicine clerkship. As part of a larger national study on duty-hour reform, 67 of 150 eligible third-year medical students completed surveys about career choice, teaching and supervision, assessment, patient care, well-being, and attractiveness of a career in internal medicine after completing their internal medicine clerkship. Students who rotated to hospitals with shift-based systems were compared to those who did not. Non-demographic variables used a five-point Likert scale. Chi-squared and Fisher's exact tests were used to assess the relationships between exposure to shift-based schedules and student responses. Questions with univariate p ≤ 0.1 were included in multivariable logistic regression models. Thirty-six students (54%) were exposed to shift-based schedules. Students exposed to shift-based schedules were less likely to perceive that their attendings were committed to teaching (odds ratio [OR] 0.35, 95% confidence interval [CI]: 0.13-0.90, p = 0.01) or perceive that residents had sufficient exposure to assess their performance (OR 0.29, 95% CI: 0.09-0.91, p = 0.03). However, those students were more likely to feel their interns were able to observe them at the bedside (OR 1.89, 95% CI: 1.08-3.13, p = 0.02) and had sufficient exposure to assess their performance (OR 3.00, 95% CI: 1.01-8.86, p = 0.05). These findings suggest that shift-based schedules designed in response to duty-hour reform may have important broader implications for the teaching environment.

  15. A multi-criteria model for maintenance job scheduling

    Directory of Open Access Journals (Sweden)

    Sunday A. Oke

    2007-12-01

    Full Text Available This paper presents a multi-criteria maintenance job scheduling model, which is formulated using a weighted multi-criteria integer linear programming maintenance scheduling framework. Three criteria, which have direct relationship with the primary objectives of a typical production setting, were used. These criteria are namely minimization of equipment idle time, manpower idle time and lateness of job with unit parity. The mathematical model constrained by available equipment, manpower and job available time within planning horizon was tested with a 10-job, 8-hour time horizon problem with declared equipment and manpower available as against the required. The results, analysis and illustrations justify multi-criteria consideration. Thus, maintenance managers are equipped with a tool for adequate decision making that guides against error in the accumulated data which may lead to wrong decision making. The idea presented is new since it provides an approach that has not been documented previously in the literature.

  16. Sleep inertia during a simulated 6-h on/6-h off fixed split duty schedule.

    Science.gov (United States)

    Hilditch, Cassie J; Short, Michelle; Van Dongen, Hans P A; Centofanti, Stephanie A; Dorrian, Jillian; Kohler, Mark; Banks, Siobhan

    Sleep inertia is a safety concern for shift workers returning to work soon after waking up. Split duty schedules offer an alternative to longer shift periods, but introduce additional wake-ups and may therefore increase risk of sleep inertia. This study investigated sleep inertia across a split duty schedule. Sixteen participants (age range 21-36 years; 10 females) participated in a 9-day laboratory study with two baseline nights (10 h time in bed, [TIB]), four 24-h periods of a 6-h on/6-h off split duty schedule (5-h TIB in off period; 10-h TIB per 24 h) and two recovery nights. Two complementary rosters were evaluated, with the timing of sleep and wake alternating between the two rosters (2 am/2 pm wake-up roster versus 8 am/8 pm wake-up roster). At 2, 17, 32 and 47 min after scheduled awakening, participants completed an 8-min inertia test bout, which included a 3-min psychomotor vigilance test (PVT-B), a 3-min Digit-Symbol Substitution Task (DSST), the Karolinska Sleepiness Scale (KSS), and the Samn-Perelli Fatigue Scale (SP-Fatigue). Further testing occurred every 2 h during scheduled wakefulness. Performance was consistently degraded and subjective sleepiness/fatigue was consistently increased during the inertia testing period as compared to other testing times. Morning wake-ups (2 am and 8 am) were associated with higher levels of sleep inertia than later wake-ups (2 pm and 8 pm). These results suggest that split duty workers should recognise the potential for sleep inertia after waking, especially during the morning hours.

  17. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  18. The Reinforcing Effects of Houselight Illumination during Chained Schedules of Food Presentation

    Science.gov (United States)

    Allen, Ron; Kupfer, Jeff; Malagodi, E. F.

    2008-01-01

    Pigeons' keypecking was maintained under two- and three-component chained schedules of food presentation. The component schedules were all fixed-interval schedules of either 1- or 2-min duration. Across conditions the presence of houselight illumination within each component schedule was manipulated. For each pigeon, first-component response rates…

  19. Trans-adapted, reliability, and validity of children fear survey schedule-dental subscale in Bahasa Indonesia

    Directory of Open Access Journals (Sweden)

    Arlette Suzy

    2015-03-01

    Full Text Available Background: The most frequently used measuring instrument for determination of dental fear in children nowadays is the children’s fear survey schedule-dental scale (CFSS-DS. Purpose: The purpose of this study was to explore the reliability and validity of the scale with Indonesian trans adapted version of the scale, thus the scale can be reliable to be used in other similar research in Indonesia. Methods: Total of 113 participants, who were parent’s 3 to 12 years old children. Children were divided into two age groups, group I 3-6 year old (83 children and group II 7-12 year old (30 children. Eighty three children from the first group were divided into first dental visit group (30 children and non first dental visit group (53 children. Test-retest approach was applied to 30 first dental visit children aged 3-6 year old. Original scale was translated to Indonesian language. Result: The result showed the high value of the Cronbach’s coefficient of internal consistency α=0.956. Three factors were extracted by screen test method with Eigen values higher than 1, which explained 93.05% variance of results. Conclusion: CFSS-DS scale is reliable and valid psychometric instrument for dental fear evaluation in children in Bahasa Indonesia. The differences between this study and those of others may appear due to many factors. Normal 0 false false false EN-US X-NONE X-NONE

  20. Systematic literature review comparing rapid 3-dose administration of the GSK tick-borne encephalitis vaccine with other primary immunization schedules.

    Science.gov (United States)

    Galgani, Ilaria; Bunge, Eveline M; Hendriks, Lisa; Schludermann, Christopher; Marano, Cinzia; De Moerlooze, Laurence

    2017-09-01

    Tick-borne encephalitis (TBE), which is endemic across large regions of Europe and Asia, is most effectively prevented through vaccination. Three-dose primary TBE vaccination schedules are either rapid (0,7,21-days) or conventional (0,28-84-days, 9-12-months). The second dose can also be administered at 14 days for faster priming and sero-protection). Areas covered: We used a three-step selection process to identify 21 publications comparing the immunogenicity and/or safety of different schedules. Expert commentary: Priming with two or three TBE vaccine doses was highly immunogenic. After conventional priming (0-28 days), 95% adults and ≥95% children had neutralization test (NT) titers ≥10 at 14 days post-dose-2 compared with 92% adults and 99% children at 21 days post-dose-3 (rapid schedule). Most subjects retained NT titers ≥10 at day 300. A single booster dose induced a strong immune response in all subjects irrespective of primary vaccination schedule or elapsed time since priming. GMT peaked at 42 days post-dose-1 (i.e., 21 days post-dose 3 [rapid-schedule], or 14-28 days post-dose-2 [conventional-schedule]), and declined thereafter. Adverse events were generally rare and declined with increasing doses. In the absence of data to recommend one particular schedule, the regimen choice will remain at the physician's discretion, based on patient constraints and availability.

  1. Runway Scheduling Using Generalized Dynamic Programming

    Science.gov (United States)

    Montoya, Justin; Wood, Zachary; Rathinam, Sivakumar

    2011-01-01

    A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

  2. Job schedul in Grid batch farms

    International Nuclear Information System (INIS)

    Gellrich, Andreas

    2014-01-01

    We present here a study for a scheduler which cooperates with the queueing system TORQUE and is tailored to the needs of a HEP-dominated large Grid site with around 10000 jobs slots. Triggered by severe scaling problems of MAUI, a scheduler, referred to as MYSCHED, was developed and put into operation. We discuss conceptional aspects as well as experiences after almost two years of running.

  3. Short-term hydro generation scheduling of Three Gorges–Gezhouba cascaded hydropower plants using hybrid MACS-ADE approach

    International Nuclear Information System (INIS)

    Mo, Li; Lu, Peng; Wang, Chao; Zhou, Jianzhong

    2013-01-01

    Highlights: • MACS and ADE algorithms are hybridized as MACS-ADE method for solving STHGS problem. • An adaptive mutation is integrated into the proposed algorithm to avoid premature convergence. • MACS and ADE are run in parallel in search of better solution. • Several effective heuristic strategies are designed for dealing with various constraints of STHGS problem. - Abstract: Short-term hydro generation scheduling (STHGS) aims at determining optimal hydro generation scheduling to obtain minimum water consumption for one day or week while meeting various system constraints. In this paper, the STHGS problem is decomposed into two sub-problems: (i) unit commitment (UC) sub-problem; (ii) economic load dispatch (ELD) sub-problem. Then, we present a hybrid algorithm based on multi ant colony system (MACS) and differential evolution (DE) for solving the STHGS problem. First, MACS is used for dealing with UC sub-problem. A set of cooperating ant colonies cooperate to choose the unit state over the scheduled time horizon. Then, the adaptive differential evolution (ADE) is used to solve ELD sub-problem. MACS and ADE are run in parallel with adjusting their solutions in search of a better solution. Meanwhile, local and global pheromone updating rules in MACS and adaptive dynamic parameter adjusting strategy in DE are applied for enhancing the search ability of MACS-ADE. Finally, the proposed method is implemented to solve STHGS problem of Three Gorges–Gezhouba cascaded hydropower plants to verify the feasibility and effectiveness. Compared with other established methods, the simulation results reveal that the proposed MACS-ADE approach has the best convergence property, computational efficiency with less water consumption

  4. Game Schedules and Rate of Concussions in the National Football League.

    Science.gov (United States)

    Teramoto, Masaru; Cushman, Daniel M; Cross, Chad L; Curtiss, Heather M; Willick, Stuart E

    2017-11-01

    Concussion prevention in the National Football League (NFL) is an important priority for player safety. The NFL now has modified game schedules, and one concern is that unconventional game schedules, such as a shortened rest period due to playing on a Thursday rather than during the weekend, may lead to an increased risk of injuries. Unconventional game schedules in the NFL are associated with an increased rate of concussion. Descriptive epidemiological study. This study analyzed concussions and game schedules over the NFL regular seasons from 2012 to 2015 (4 years). Documented numbers of concussions, identified by use of the online database PBS Frontline Concussion Watch, were summarized by regular-season weeks. Association of days of rest and game location (home, away, or overseas) with the rate of concussion was examined by use of the χ 2 test. Logistic regression analysis was performed to examine the relationships of days of rest and home/away games to the risk of repeated concussions, with adjustment for player position. A total of 582 concussions were analyzed in this study. A significantly greater number of concussions occurred in the second half of the season ( P game location, or timing of the bye week by the team or the opponent ( P > .05). Game schedules were not significantly associated with the occurrence of repeat concussions ( P > .05). Unconventional game schedules in the NFL, including playing on Thursday and playing overseas, do not seem to put players at increased risk of concussions.

  5. Mathematical models for a batch scheduling problem to minimize earliness and tardiness

    Directory of Open Access Journals (Sweden)

    Basar Ogun

    2018-05-01

    Full Text Available Purpose: Today’s manufacturing facilities are challenged by highly customized products and just in time manufacturing and delivery of these products. In this study, a batch scheduling problem is addressed to provide on-time completion of customer orders in the environment of lean manufacturing. The problem is to optimize partitioning of product components into batches and scheduling of the resulting batches where each customer order is received as a set of products made of various components. Design/methodology/approach: Three different mathematical models for minimization of total earliness and tardiness of customer orders are developed to provide on-time completion of customer orders and also, to avoid from inventory of final products. The first model is a non-linear integer programming model while the second is a linearized version of the first. Finally, to solve larger sized instances of the problem, an alternative linear integer model is presented. Findings: Computational study using a suit set of test instances showed that the alternative linear integer model is able to solve all test instances in varying sizes within quite shorter computer times comparing to the other two models. It was also showed that the alternative model can solve moderate sized real-world problems. Originality/value: The problem under study differentiates from existing batch scheduling problems in the literature since it includes new circumstances which may arise in real-world applications. This research, also, contributes the literature of batch scheduling problem by presenting new optimization models.

  6. Performance Evaluation of Bidding-Based Multi-Agent Scheduling Algorithms for Manufacturing Systems

    Directory of Open Access Journals (Sweden)

    Antonio Gordillo

    2014-10-01

    Full Text Available Artificial Intelligence techniques have being applied to many problems in manufacturing systems in recent years. In the specific field of manufacturing scheduling many studies have been published trying to cope with the complexity of the manufacturing environment. One of the most utilized approaches is (multi agent-based scheduling. Nevertheless, despite the large list of studies reported in this field, there is no resource or scientific study on the performance measure of this type of approach under very common and critical execution situations. This paper focuses on multi-agent systems (MAS based algorithms for task allocation, particularly in manufacturing applications. The goal is to provide a mechanism to measure the performance of agent-based scheduling approaches for manufacturing systems under key critical situations such as: dynamic environment, rescheduling, and priority change. With this mechanism it will be possible to simulate critical situations and to stress the system in order to measure the performance of a given agent-based scheduling method. The proposed mechanism is a pioneering approach for performance evaluation of bidding-based MAS approaches for manufacturing scheduling. The proposed method and evaluation methodology can be used to run tests in different manufacturing floors since it is independent of the workshop configuration. Moreover, the evaluation results presented in this paper show the key factors and scenarios that most affect the market-like MAS approaches for manufacturing scheduling.

  7. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  8. Weather Test Reference Year of Greenland

    DEFF Research Database (Denmark)

    Kragh, Jesper; Pedersen, Frank; Svendsen, Svend

    2005-01-01

    the construction of two test reference years of Greenland used in the work of establishing new energy frame for the coming building code of Greenland. The first test reference year is constructed using measurements of climatic parameters from the town Nuuk located in the southwestern part of Greenland. The second...... test reference year is constructed using measurements from the town Uummannaq located in the north part of Greenland on the west coast. The construction of the test reference years fulfills the procedures described in the standard EN ISO 15927-4 using the following main weather parameters: Dry bulb...... temperature, global radiation, relative humidity and mean wind speed. To construct the test reference years a program called REFYEAR was developed in MatLab. REFYEAR automatically constructs the test reference year using an input file containing the climatic measurements. The two constructed test reference...

  9. Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges

    Science.gov (United States)

    Marquez, Jessica J.; Ludowise, Melissa; McCurdy, Michael; Li, Jack

    2010-01-01

    Versions of Scheduling and Planning Interface for Exploration (SPIFe) have supported a variety of mission operations across NASA. This software tool has evolved and matured over several years, assisting planners who develop intricate schedules. While initially conceived for surface Mars missions, SPIFe has been deployed in other domains, where people rather than robotic explorers, execute plans. As a result, a diverse set of end-users has compelled growth in a new direction: supporting real-time operations. This paper describes the new needs and challenges that accompany this development. Among the key features that have been built for SPIFe are current time indicators integrated into the interface and timeline, as well as other plan attributes that enable execution of scheduled activities. Field tests include mission support for the Lunar CRater Observation and Sensing Satellite (LCROSS), NASA Extreme Environment Mission Operations (NEEMO) and Desert Research and Technology Studies (DRATS) campaigns.

  10. Fast Flux Test Facility: the first three years, 1982-1985

    International Nuclear Information System (INIS)

    1985-01-01

    General information is provided concerning the Fast Flux Test Facility. Topics discussed include: mission and major accomplishments; background information; major construction milestones; acceptance testing; plant performance; plant operation; fuel performance; interim examination and maintenance cell; environmental effects; and future plans for the FFTF

  11. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  12. Contextual Interference Effects in Learning Three Badminton Serves.

    Science.gov (United States)

    Goode, Sinah; Magill, Richard A.

    1986-01-01

    This study was made to validate results obtained in laboratory research. Thirty female students learned three badminton serves in either a low, mixed, or high interference practice schedule and were given a retention and transfer test. Results are discussed. (Author/MT)

  13. Restless Legs Syndrome/Willis-Ekbom Disease Is Prevalent in Working Nurses, but Seems Not to Be Associated with Shift Work Schedules.

    Science.gov (United States)

    Waage, Siri; Pallesen, Ståle; Moen, Bente Elisabeth; Bjorvatn, Bjørn

    2018-01-01

    Insomnia and excessive sleepiness are among the most commonly reported sleep problems related to shift work. Sleep-related movement disorders have, however, received far less attention in relation to such work schedules. The objective of this study was to investigate the association between different shift work schedules and the prevalence of Restless legs syndrome/Willis-Ekbom disease (RLS/WED) in a large sample of Norwegian nurses. Our hypothesis was that shift working nurses would report higher prevalence of RLS/WED compared to day workers. A total of 1,788 nurses with different work schedules (day work, two-shift rotation, night work, three shift rotation) participated in a cohort study, started in 2008/2009. Four questions about RLS/WED based on the diagnostic criteria were included in wave 4 (2012). RLS/WED prevalence rates across different shift schedules were explored by the Pearson chi-square test. Logistic regression analysis was used to assess the association between RLS/WED and work schedules and shift work disorder (SWD) with adjustment for sex, age, marital status, smoking, and caffeine use. In total, 90.0% of the nurses were females, mean age 36.5 years (SD = 8.6, range 25-67). The overall prevalence of RLS/WED was 26.8%. We found no significant differences between the prevalence of RLS/WED across the different shift schedules, ranging from 23.3% (day work) to 29.4% (night work). There was a significant difference ( p  shift work also are sensitive to other complaints related to a misalignment of the biological clock.

  14. Automated medical resident rotation and shift scheduling to ensure quality resident education and patient care.

    Science.gov (United States)

    Smalley, Hannah K; Keskinocak, Pinar

    2016-03-01

    At academic teaching hospitals around the country, the majority of clinical care is provided by resident physicians. During their training, medical residents often rotate through various hospitals and/or medical services to maximize their education. Depending on the size of the training program, manually constructing such a rotation schedule can be cumbersome and time consuming. Further, rules governing allowable duty hours for residents have grown more restrictive in recent years (ACGME 2011), making day-to-day shift scheduling of residents more difficult (Connors et al., J Thorac Cardiovasc Surg 137:710-713, 2009; McCoy et al., May Clin Proc 86(3):192, 2011; Willis et al., J Surg Edu 66(4):216-221, 2009). These rules limit lengths of duty periods, allowable duty hours in a week, and rest periods, to name a few. In this paper, we present two integer programming models (IPs) with the goals of (1) creating feasible assignments of residents to rotations over a one-year period, and (2) constructing night and weekend call-shift schedules for the individual rotations. These models capture various duty-hour rules and constraints, provide the ability to test multiple what-if scenarios, and largely automate the process of schedule generation, solving these scheduling problems more effectively and efficiently compared to manual methods. Applying our models on data from a surgical residency program, we highlight the infeasibilities created by increased duty-hour restrictions placed on residents in conjunction with current scheduling paradigms.

  15. Medium-dose-rate brachytherapy of cancer of the cervix: preliminary results of a prospectively designed schedule based on the linear-quadratic model

    International Nuclear Information System (INIS)

    Leborgne, Felix; Fowler, Jack F.; Leborgne, Jose H.; Zubizarreta, Eduardo; Curochquin, Rene

    1999-01-01

    Purpose: To compare results and complications of our previous low-dose-rate (LDR) brachytherapy schedule for early-stage cancer of the cervix, with a prospectively designed medium-dose-rate (MDR) schedule, based on the linear-quadratic model (LQ). Methods and Materials: A combination of brachytherapy, external beam pelvic and parametrial irradiation was used in 102 consecutive Stage Ib-IIb LDR treated patients (1986-1990) and 42 equally staged MDR treated patients (1994-1996). The planned MDR schedule consisted of three insertions on three treatment days with six 8-Gy brachytherapy fractions to Point A, two on each treatment day with an interfraction interval of 6 hours, plus 18 Gy external whole pelvic dose, and followed by additional parametrial irradiation. The calculated biologically effective dose (BED) for tumor was 90 Gy 10 and for rectum below 125 Gy 3 . Results: In practice the MDR brachytherapy schedule achieved a tumor BED of 86 Gy 10 and a rectal BED of 101 Gy 3 . The latter was better than originally planned due to a reduction from 85% to 77% in the percentage of the mean dose to the rectum in relation to Point A. The mean overall treatment time was 10 days shorter for MDR in comparison with LDR. The 3-year actuarial central control for LDR and MDR was 97% and 98% (p = NS), respectively. The Grades 2 and 3 late complications (scale 0 to 3) were 1% and 2.4%, respectively for LDR (3-year) and MDR (2-year). Conclusions: LQ is a reliable tool for designing new schedules with altered fractionation and dose rates. The MDR schedule has proven to be an equivalent treatment schedule compared with LDR, with an additional advantage of having a shorter overall treatment time. The mean rectal BED Gy 3 was lower than expected

  16. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  17. Evaluation of a twelve-hour/day shift schedule

    International Nuclear Information System (INIS)

    Lewis, P.M.; Swaim, D.J.

    1986-01-01

    In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8-hour to a 12-hour a day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off-the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility

  18. INVITATION TO PERFORM Y2K TESTING UNDER UNIX

    CERN Multimedia

    CERN Y2K Co-ordinator

    1999-01-01

    IntroductionA special AFS cell Ôy2k.cern.chÕ has been established to allow service managers and users to test y2k compliance.In addition to AFS, the cluster consists of machines representing all the Unix flavours in use at CERN (AIX, DUNIX, HP-UX, IRIX, LINUX, and SOLARIS).More information can be obtained from the page: http://wwwinfo.cern.ch/pdp/bis/y2k/y2kplus.htmlTesting scheduleThe cluster will be set to 25 December 1999 on fixed days and then left running for three weeks. This gives people one week to prepare test programs in 1999 and two weeks to check the consequences of passing into year 2000. These fixed dates are set as follows:— 19 May 1999, date set to 25/12/99 (year 2000 starts on 26 May) — 9 June1999, date set to 25/12/99 (year 2000 starts on 16 June)— 30 June 1999, date set to 25/12/99 (year 2000 starts on 7 July)If more than these three sessions are needed an announcement will be made later. RegistrationThe following Web page should be used for r...

  19. Solving a chemical batch scheduling problem by local search

    NARCIS (Netherlands)

    Brucker, P.; Hurink, Johann L.

    1999-01-01

    A chemical batch scheduling problem is modelled in two different ways as a discrete optimization problem. Both models are used to solve the batch scheduling problem in a two-phase tabu search procedure. The method is tested on real-world data.

  20. Advance Resource Provisioning in Bulk Data Scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Balman, Mehmet

    2012-10-01

    Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improve the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.

  1. Special wasteform lysimeters initial three-year monitoring report

    International Nuclear Information System (INIS)

    Oblath, S.B.; Grant, M.W.

    1985-01-01

    Lysimeters containing ten typical commercial power reactor low-level wsteforms are in operation at the Savannah River Plant. This ten-year program is designed to measure the leaching and migration of radionuclides from these wasteforms under realistic burial ground conditions in a humid site. The data which the lysimeters provide serves as a technical basis for evaluating the performance of the wasteforms under actual burial conditions. Three years' operation of the lysimeters has demonstrated that all of the wasteforms perform excellently, with minimal releases of radioactivity. Cement-based wasteforms appear superior at retaining strontium. Polymer-based wasteforms appear superior at retaining cobalt and cesium isotopes. The releases of activity from the lysimeters are compared to the leaching behavior in immersion tests, with several differences noted. The conclusions drawn in this study are tentative, subject to the performance of the wasteforms after the lysimeters have been in operation for a longer period of time

  2. The spirit of St. Lucie: nuclear plant built on schedule

    International Nuclear Information System (INIS)

    Derrickson, W.B.

    1984-01-01

    Florida Power and Light Company currently has four nuclear units in operation with St. Lucie Unit 2 being the last to receive an operating license in June, 1983. It's sister Unit 1 received its license in 1976 and has, through 1982, compiled one of the best operating records in the United States. The full power license for St. Lucie Unit 2 was received from the Nuclear Regulatory Commission (NRC) on June 10, 1983, just six years after construction began. The industry average for construction of nuclear plants in this time period is about 10 years. The success of the St. Lucie Unit 2 project can be at least in part attributed to planning the work, accurate and timely reporting of results via valid indicators, well trained and skilled personnel, and most of all, teamwork. During the course of the project the plant was constantly on or near schedule and always ahead of industry averages. This was done despite issuance of numerous regulations by the NRC (TMI), a 1979 hurricane which did considerable damage to the Reactor Auxiliary Building, labor problems, and an NRC schedule review team that determined the best that could be done was to complete the plant a year later. The final price tag is about $1.42 billion, including ''allowance for funds used during construction''. In operation to date the post core loading test program has been completed in less than two months, enabling the plant to be put into commercial operation only two months after its original scheduled date of May 28, 1983exclamation

  3. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  4. A short-term operating room surgery scheduling problem integrating multiple nurses roster constraints.

    Science.gov (United States)

    Xiang, Wei; Yin, Jiao; Lim, Gino

    2015-02-01

    Operating room (OR) surgery scheduling determines the individual surgery's operation start time and assigns the required resources to each surgery over a schedule period, considering several constraints related to a complete surgery flow and the multiple resources involved. This task plays a decisive role in providing timely treatments for the patients while balancing hospital resource utilization. The originality of the present study is to integrate the surgery scheduling problem with real-life nurse roster constraints such as their role, specialty, qualification and availability. This article proposes a mathematical model and an ant colony optimization (ACO) approach to efficiently solve such surgery scheduling problems. A modified ACO algorithm with a two-level ant graph model is developed to solve such combinatorial optimization problems because of its computational complexity. The outer ant graph represents surgeries, while the inner graph is a dynamic resource graph. Three types of pheromones, i.e. sequence-related, surgery-related, and resource-related pheromone, fitting for a two-level model are defined. The iteration-best and feasible update strategy and local pheromone update rules are adopted to emphasize the information related to the good solution in makespan, and the balanced utilization of resources as well. The performance of the proposed ACO algorithm is then evaluated using the test cases from (1) the published literature data with complete nurse roster constraints, and 2) the real data collected from a hospital in China. The scheduling results using the proposed ACO approach are compared with the test case from both the literature and the real life hospital scheduling. Comparison results with the literature shows that the proposed ACO approach has (1) an 1.5-h reduction in end time; (2) a reduction in variation of resources' working time, i.e. 25% for ORs, 50% for nurses in shift 1 and 86% for nurses in shift 2; (3) an 0.25h reduction in

  5. The Simultaneous Vehicle Scheduling and Passenger Service Problem

    DEFF Research Database (Denmark)

    Petersen, Hanne Løhmann; Larsen, Allan; Madsen, Oli B.G.

    modifications of the timetable during the vehicle scheduling phase. This planning approach is referred to as the Simultaneous Vehicle Scheduling and Passenger Service Problem (SVSPSP). The SVSPSP is solved using a large neighbourhood search metaheuristic. The proposed framework is tested on data inspired......Passengers using public transport systems often experience waiting times when transferring between two scheduled services. We propose a planning approach which seeks to obtain a favorable trade-off between the conflicting objectives passenger service and operating cost, by allowing some moderate...

  6. Maternal Nonstandard Work Schedules and Child Cognitive Outcomes

    Science.gov (United States)

    Han, Wen-Jui

    2005-01-01

    This paper examined associations between mothers' work schedules and children's cognitive outcomes in the first 3 years of life for approximately 900 children from the National Institute of Child Health and Human Development Study of Early Child Care. Both the timing and duration of maternal nonstandard work schedules were examined. Although…

  7. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    Science.gov (United States)

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout

  8. Natalizumab Significantly Improves Cognitive Impairment over Three Years in MS: Pattern of Disability Progression and Preliminary MRI Findings.

    Directory of Open Access Journals (Sweden)

    Flavia Mattioli

    Full Text Available Previous studies reported that Multiple Sclerosis (MS patients treated with natalizumab for one or two years exhibit a significant reduction in relapse rate and in cognitive impairment, but the long term effects on cognitive performance are unknown. This study aimed to evaluate the effects of natalizumab on cognitive impairment in a cohort of 24 consecutive patients with relapsing remitting MS treated for 3 years. The neuropsychological tests, as well as relapse number and EDSS, were assessed at baseline and yearly for three years. The impact on cortical atrophy was also considered in a subgroup of them, and are thus to be considered as preliminary. Results showed a significant reduction in the number of impaired neuropsychological tests after three years, a significant decrease in annualized relapse rate at each time points compared to baseline and a stable EDSS. In the neuropsychological assessment, a significant improvement in memory, attention and executive function test scores was detected. Preliminary MRI data show that, while GM volume did not change at 3 years, a significantly greater parahippocampal and prefrontal gray matter density was noticed, the former correlating with neuropsychological improvement in a memory test. This study showed that therapy with Natalizumab is helpful in improving cognitive performance, and is likely to have a protective role on grey matter, over a three years follow-up.

  9. Optimal Intermittent Dose Schedules for Chemotherapy Using Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    Nadia ALAM

    2013-08-01

    Full Text Available In this paper, a design method for optimal cancer chemotherapy schedules via genetic algorithm (GA is presented. The design targets the key objective of chemotherapy to minimize the size of cancer tumor after a predefined time with keeping toxic side effects in limit. This is a difficult target to achieve using conventional clinical methods due to poor therapeutic indices of existing anti-cancer drugs. Moreover, there are clinical limitations in treatment administration to maintain continuous treatment. Besides, carefully decided rest periods are recommended to for patient’s comfort. Three intermittent drug scheduling schemes are presented in this paper where GA is used to optimize the dose quantities and timings by satisfying several treatment constraints. All three schemes are found to be effective in total elimination of cancer tumor after an agreed treatment length. The number of cancer cells is found zero at the end of the treatment for all three cases with tolerable toxicity. Finally, two of the schemes, “Fixed interval variable dose (FIVD and “Periodic dose” that are periodic in characteristic have been emphasized due to their additional simplicity in administration along with friendliness to patients. responses to the designed treatment schedules. Therefore the proposed design method is capable of planning effective, simple, patient friendly and acceptable chemotherapy schedules.

  10. On the optimal scheduling of periodic tests and maintenance for reliable redundant components

    International Nuclear Information System (INIS)

    Courtois, Pierre-Jacques; Delsarte, Philippe

    2006-01-01

    Periodically, some m of the n redundant components of a dependable system may have to be taken out of service for inspection, testing or preventive maintenance. The system is then constrained to operate with lower (n-m) redundancy and thus with less reliability during these periods. However, more frequent periodic inspections decrease the probability that a component fail undetected in the time interval between successive inspections. An optimal time schedule of periodic preventive operations arises from these two conflicting factors, balancing the loss of redundancy during inspections against the reliability benefits of more frequent inspections. Considering no other factor than this decreased redundancy at inspection time, this paper demonstrates the existence of an optimal interval between inspections, which maximizes the mean time between system failures. By suitable transformations and variable identifications, an analytic closed form expression of the optimum is obtained for the general (m, n) case. The optimum is shown to be unique within the ranges of parameter values valid in practice; its expression is easy to evaluate and shown to be useful to analyze and understand the influence of these parameters. Inspections are assumed to be perfect, i.e. they cause no component failure by themselves and leave no failure undetected. In this sense, the optimum determines a lowest bound for the system failure rate that can be achieved by a system of n-redundant components, m of which require for inspection or maintenance recurrent periods of unavailability of length t. The model and its general closed form solution are believed to be new . Previous work had computed optimal values for an estimation of a time average of system unavailability, but by numerical procedures only and with different numerical approximations, other objectives and model assumptions (one component only inspected at a time), and taking into account failures caused by testing itself, repair and

  11. THE PRELIMINARY DATA ON NATIONAL IMMUNIZATION SCHEDULE VACCINES COMBINED APPLICATION IN CHILDREN OF 6–7 YEARS OLD

    Directory of Open Access Journals (Sweden)

    I. V. Konovalov

    2012-01-01

    Full Text Available In the study, safety for influenza vaccine in combination with diphtheria vaccine, tetanus and measles vaccine, rubella vaccine, and epidemic parotitis in children of 6–7 years old was assessed. All vaccines showed good tolerability and low reactogenicity for combined immunization. Influenza «Grippol plus» vaccine is safe and highly immunogenic, and does not cause cross antibody suppression being applied in combination with mentioned National Immunization Schedule vaccines.

  12. Patch testing for allergic contact dermatitis: Three years retrospective results in Tekirdağ

    Directory of Open Access Journals (Sweden)

    Gamze Erfan

    2015-06-01

    Full Text Available Background and Design: Allergic contact dermatitis is a delayed type hypersensitivity reaction to allergens in individuals who were sensitized with same allergens before. The causative allergens may change in time as well as vary among geographical and population based differences. Materials and Methods: The characteristics of 169 patients-107 (63.3% male, 62 (36.7% female, who patch tested between 2011- 2014 with allergic contact dermatitis diagnosis and test results were retrospectively analysed. Results: The mean age of all patients who had the most frequent occupation as service sector/house wife (26.6% were 41.06 years and the mean disease duration of all patients was 19.5 months. The most frequent localization of disease was hands (n: 105,%73 and %50.3 of patients had positivity with at least one allergen. The most frequent seven allergens with positivity were nickel sulfate (n: 50, %29.6, cobalt chloride (n: 23, %13.6, potassium dichromate (n: 22, %13, sesquiterpene lactone mix (n: 18, %10.7, thiuram (n: 10, %5.9, clioquinol mix (n: 10, %5.9 and 4-tert-butilfenol formaldehyde resin (n: 10, %5.9, respectively. On the other hand in all patients there were no positivity with N-Isopropyl-N-phenyl-4-phenylenediamine, epoxy resin, balsam of peru, formaldehyde, quaternium-15, primin, tixocortol-21-pivalate, fragrance mix-2. Conclusion: In comparison of this study which first reports patch test results of patients in Tekirdağ-a city in Trakya region and other studies that report patch test results of different regions of our country; the mean age of patients of present study were older and there were similar results for occupations and localization of disease in between eastern region and present study. We believe that further studies are needed to specify allergen characteristics of Trakya region using multicenter studies, which include other cities as well.

  13. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  14. Long Term Corrosion/Degradation Test Six Year Results

    Energy Technology Data Exchange (ETDEWEB)

    M. K. Adler Flitton; C. W. Bishop; M. E. Delwiche; T. S. Yoder

    2004-09-01

    The Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC) located at the Idaho National Engineering and Environmental Laboratory (INEEL) contains neutron-activated metals from non-fuel, nuclear reactor core components. The Long-Term Corrosion/Degradation (LTCD) Test is designed to obtain site-specific corrosion rates to support efforts to more accurately estimate the transfer of activated elements to the environment. The test is using two proven, industry-standard methods—direct corrosion testing using metal coupons, and monitored corrosion testing using electrical/resistance probes—to determine corrosion rates for various metal alloys generally representing the metals of interest buried at the SDA, including Type 304L stainless steel, Type 316L stainless steel, Inconel 718, Beryllium S200F, Aluminum 6061, Zircaloy-4, low-carbon steel, and Ferralium 255. In the direct testing, metal coupons are retrieved for corrosion evaluation after having been buried in SDA backfill soil and exposed to natural SDA environmental conditions for times ranging from one year to as many as 32 years, depending on research needs and funding availability. In the monitored testing, electrical/resistance probes buried in SDA backfill soil will provide corrosion data for the duration of the test or until the probes fail. This report provides an update describing the current status of the test and documents results to date. Data from the one-year and three-year results are also included, for comparison and evaluation of trends. In the six-year results, most metals being tested showed extremely low measurable rates of general corrosion. For Type 304L stainless steel, Type 316L stainless steel, Inconel 718, and Ferralium 255, corrosion rates fell in the range of “no reportable” to 0.0002 mils per year (MPY). Corrosion rates for Zircaloy-4 ranged from no measurable corrosion to 0.0001 MPY. These rates are two orders of magnitude lower than those specified in

  15. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  16. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  17. Thinking Outside the Block: An Innovative Alternative to 4X4 Block Scheduling.

    Science.gov (United States)

    Frank, Myra

    2002-01-01

    Introduces a 4x1 block scheduling method that was developed as an alternative to 4x4 block scheduling. Schedules Fridays for summer school, test preparation, and enrichment and elective courses. Includes suggestions on how to alleviate drawbacks of the 4x1 block schedule. (YDS)

  18. The DEEP-South: Scheduling and Data Reduction Software System

    Science.gov (United States)

    Yim, Hong-Suh; Kim, Myung-Jin; Bae, Youngho; Moon, Hong-Kyu; Choi, Young-Jun; Roh, Dong-Goo; the DEEP-South Team

    2015-08-01

    The DEep Ecliptic Patrol of the Southern sky (DEEP-South), started in October 2012, is currently in test runs with the first Korea Microlensing Telescope Network (KMTNet) 1.6 m wide-field telescope located at CTIO in Chile. While the primary objective for the DEEP-South is physical characterization of small bodies in the Solar System, it is expected to discover a large number of such bodies, many of them previously unknown.An automatic observation planning and data reduction software subsystem called "The DEEP-South Scheduling and Data reduction System" (the DEEP-South SDS) is currently being designed and implemented for observation planning, data reduction and analysis of huge amount of data with minimum human interaction. The DEEP-South SDS consists of three software subsystems: the DEEP-South Scheduling System (DSS), the Local Data Reduction System (LDR), and the Main Data Reduction System (MDR). The DSS manages observation targets, makes decision on target priority and observation methods, schedules nightly observations, and archive data using the Database Management System (DBMS). The LDR is designed to detect moving objects from CCD images, while the MDR conducts photometry and reconstructs lightcurves. Based on analysis made at the LDR and the MDR, the DSS schedules follow-up observation to be conducted at other KMTNet stations. In the end of 2015, we expect the DEEP-South SDS to achieve a stable operation. We also have a plan to improve the SDS to accomplish finely tuned observation strategy and more efficient data reduction in 2016.

  19. Best Speed Fit EDF Scheduling for Performance Asymmetric Multiprocessors

    Directory of Open Access Journals (Sweden)

    Peng Wu

    2017-01-01

    Full Text Available In order to improve the performance of a real-time system, asymmetric multiprocessors have been proposed. The benefits of improved system performance and reduced power consumption from such architectures cannot be fully exploited unless suitable task scheduling and task allocation approaches are implemented at the operating system level. Unfortunately, most of the previous research on scheduling algorithms for performance asymmetric multiprocessors is focused on task priority assignment. They simply assign the highest priority task to the fastest processor. In this paper, we propose BSF-EDF (best speed fit for earliest deadline first for performance asymmetric multiprocessor scheduling. This approach chooses a suitable processor rather than the fastest one, when allocating tasks. With this proposed BSF-EDF scheduling, we also derive an effective schedulability test.

  20. Spent fuel test - Climax: technical measurements. Interim report, Fiscal Year 1983

    International Nuclear Information System (INIS)

    Patrick, W.C.; Butkovich, T.R.; Carlson, R.C.

    1984-02-01

    The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on the Nevada Test Site. The test is being conducted as part of the Nevada Nuclear Waste Storage Investigations. Eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized April-May 1980. The spent-fuel canisters were retrieved and the thermal sources were de-energized in March-April 1983 when test data indicated that test objectives were met during the 3-year storage phase. The SFT-C operational objective of demonstrating the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner has been met. In addition to emplacement and retrieval operations, three exchanges of spent-fuel between the SFT-C and a surface storage facility, conducted during the storage phase, furthered this demonstration. Technical objectives of the test led to development of a technical measurements program, which is the subject of this and three previous interim reports. Geotechnical, seismological, and test status data have been recorded on a continuing basis for the 3-1/2 year duration of the test on more than 900 channels. Data acquisition from the test is now limited to instrumentation calibration and evaluation activities. Data now available for analysis are presented here. Highlights of activities this year include a campaign of in situ stress measurements, mineralogical and petrological studies of pretest core samples, microfracture analyses of laboratory irradiated cores, improved calculations of near-field heat transfer and thermomechanical response during the final months of heating as well as during a six-month cool-down period, metallurgical analyses of selected test components, and further development of the data acquisition and data management systems. 27 references, 68 figures, 10 tables

  1. Spent fuel test - Climax: technical measurements. Interim report, Fiscal Year 1983

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, W.C.; Butkovich, T.R.; Carlson, R.C.; Durham, W.B.; Ganow, H.C.; Hage, G.L.; Majer, E.L.; Montan, D.N.; Nyholm, R.A.; Rector, N.L.

    1984-02-01

    The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on the Nevada Test Site. The test is being conducted as part of the Nevada Nuclear Waste Storage Investigations. Eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized April-May 1980. The spent-fuel canisters were retrieved and the thermal sources were de-energized in March-April 1983 when test data indicated that test objectives were met during the 3-year storage phase. The SFT-C operational objective of demonstrating the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner has been met. In addition to emplacement and retrieval operations, three exchanges of spent-fuel between the SFT-C and a surface storage facility, conducted during the storage phase, furthered this demonstration. Technical objectives of the test led to development of a technical measurements program, which is the subject of this and three previous interim reports. Geotechnical, seismological, and test status data have been recorded on a continuing basis for the 3-1/2 year duration of the test on more than 900 channels. Data acquisition from the test is now limited to instrumentation calibration and evaluation activities. Data now available for analysis are presented here. Highlights of activities this year include a campaign of in situ stress measurements, mineralogical and petrological studies of pretest core samples, microfracture analyses of laboratory irradiated cores, improved calculations of near-field heat transfer and thermomechanical response during the final months of heating as well as during a six-month cool-down period, metallurgical analyses of selected test components, and further development of the data acquisition and data management systems. 27 references, 68 figures, 10 tables.

  2. Toward an Autonomous Telescope Network: the TBT Scheduler

    Science.gov (United States)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  3. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  4. Compositional schedulability analysis of real-time actor-based systems.

    Science.gov (United States)

    Jaghoori, Mohammad Mahdi; de Boer, Frank; Longuet, Delphine; Chothia, Tom; Sirjani, Marjan

    2017-01-01

    We present an extension of the actor model with real-time, including deadlines associated with messages, and explicit application-level scheduling policies, e.g.,"earliest deadline first" which can be associated with individual actors. Schedulability analysis in this setting amounts to checking whether, given a scheduling policy for each actor, every task is processed within its designated deadline. To check schedulability, we introduce a compositional automata-theoretic approach, based on maximal use of model checking combined with testing. Behavioral interfaces define what an actor expects from the environment, and the deadlines for messages given these assumptions. We use model checking to verify that actors match their behavioral interfaces. We extend timed automata refinement with the notion of deadlines and use it to define compatibility of actor environments with the behavioral interfaces. Model checking of compatibility is computationally hard, so we propose a special testing process. We show that the analyses are decidable and automate the process using the Uppaal model checker.

  5. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  6. Revision of nuclear power plants safety systems' routine testing assigned periodicity during the design extension period

    International Nuclear Information System (INIS)

    Skalozubov, V.I.; Kozlov, Yi.L.; Chulkyin, O.O.

    2017-01-01

    When nuclear power plants safety systems thermal equipment operation extending, a necessary requirement shall rely on revising the scheduled equipment tests frequency to optimize those tests schedule taking into account the equipment remained lifespan. On the one hand, there exists a need for tests frequency increase to detect ''hidden'' failures, and on the another, frequent tests cause a premature wear of the equipment. Proposed is an original method for optimizing the frequency of NPPs safety systems thermal engineering equipment testing. Essential in the proposed method is the optimization criterion chosen: index of security system failure probability non-exceedance during the beyond-design operating period as referred to the failure probability expected considering the equipment residual resource during the design operating period. The developed method implementation when applied to NPPs safety systems operated beyond the design service life at nuclear power plants with WWER-1000 series reactors, allowed to establish that the optimal tests frequency makes half the designed one when the equipment service life is extended by five years and three times less that the designed frequency when subject lifespan extended by 10 years.

  7. Cure Schedule for Stycast 2651/Catalyst 11.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, Tg, exceeding cure temperature).

  8. Job scheduling in a heterogenous grid environment

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-02-11

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  9. Immunogenicity of quadrivalent HPV and combined hepatitis A and B vaccine when co-administered or administered one month apart to 9-10 year-old girls according to 0-6 month schedule.

    Science.gov (United States)

    Gilca, Vladimir; Sauvageau, Chantal; Boulianne, Nicole; De Serres, Gaston; Couillard, Michel; Krajden, Mel; Ouakki, Manale; Murphy, Donald; Trevisan, Andrea; Dionne, Marc

    2014-01-01

    No immunogenicity data has been reported after a single dose of the quadrivalent HPV vaccine (qHPV-Gardasil®) and no data are available on co-administration of this vaccine with the HAV/HBV vaccine (Twinrix-Junior®). Two pre-licensure studies reported similar anti-HPV but lower anti-HBs titers when co-administering HPV and HBV vaccines. To assess the immunogenicity of the qHPV and HAV/HBV vaccine when co-administered (Group-Co-adm) or given one month apart (Group-Sep) and to measure the persistence of HPV antibodies three years post-second dose of qHPV vaccine in both study groups. 416 9-10 year-old girls were enrolled. Vaccination schedule was 0-6 months. Anti-HAV and anti-HBs were measured in all subjects 6 months post-first dose and 1 month post-second dose. Anti-HPV were measured 6 months post-first dose in Group-Co-adm and in all subjects 1 and 36 months post-second dose. Six months post-first dose: 100% of subjects had detectable anti-HAV and 56% and 73% had detectable anti-HBs in Group-Co-Adm and Group-Sep, respectively. In Group-Co-adm 94, 100, 99 and 96% had detectable antibodies to HPV 6, 11, 16 and 18, respectively. One month post-second dose of qHPV and HAV/HBV vaccine, in both study groups 99.5-100% of subjects had an anti-HAV titer ≥ 20IU/L, 97.5-97.6% an anti-HBs level ≥ 10IU/L, and 100% had an anti-HPV titer ≥ 3LU. Thirty-six months post-second dose of qHPV all but four subjects (99%) had antibodies to HPV18 and 100% had antibodies to HPV6, 11 and 16. The great majority (97-100%) had an anti-HPV titer ≥ 3 LU. Post-second dose administration of qHPV and HAV/HBV, no meaningful difference was observed in the immune response in the two study groups to any component of vaccines. The results indicate that qHPV and HAV/HBV can be given during the same vaccination session. Two doses of of qHPV and HAV/HBV vaccines induce a strong immune response. Three years post-second dose of qHPV, the great majority of subjects had antibodies to HPV types

  10. Schedule Sales Query Report Generation System

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  11. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  12. Artificial intelligence for the CTA Observatory scheduler

    Science.gov (United States)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    Propagation techniques. A simulation platform, an analysis tool and different test case scenarios for CTA were developed to test the performance of the scheduler and are also described.

  13. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    Science.gov (United States)

    1981-01-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  14. [The effect of aluminum adjuvant and immunization schedule on immunogenicity of Sabin inactivated poliovirus vaccine].

    Science.gov (United States)

    Wang, Fang; Zhang, Ming; Xie, Bing-Feng; Cao, Han; Tong, Shao-Yong; Wang, Jun-Rong; Yu, Xiao-Ping; Tang, Yang; Yang, Jing-Ran; Sun, Ming-Bo

    2013-04-01

    To study the effect of aluminume adjuvant and immunization schedule on immunogenicity of Sabin inactivated poliovirus vaccine. Four batches of Sabin IPV were produced by different concentrations of type 1, 2, and 3 poliovirus and administrated on three-dose schedule at 0, 1, 2 months and 0, 2, 4 months on rats. Serum samples were collected one month after each dose and neutralizing antibody titers against three types poliovirus were determined by micro-neutralization assay. The GMTs of neutralizing antibodies against three types poliovirus increased significantly and the seropositivity rates were 100% in all groups after 3 doses. There was no significant difference between two immunization schedules, and the 0, 2, 4 month schedule could induce higher level neutralizing antibody compared to the 0, 1, 2 month schedule. The groups with aluminum adjuvant could induce higher level neutralizing antibody compared to the groups without adjuvant. Aluminum djuvant and immunization schedule could improve the immunogenicity of Sabin IPV.

  15. The great environmental restoration cost estimating shootout: A blind test of three DOE cost estimating groups

    International Nuclear Information System (INIS)

    Klemen, Paul

    1992-01-01

    The cost of the Department of Energy's (DOE) Environmental Restoration (ER) Program has increased steadily over the last three years and, in the process, has drawn increasing scrutiny from Congress, the public, and government agencies such as the Office of Management and Budget and the General Accounting Office. Programmatic costs have been reviewed by many groups from within the DOE as well as from outside agencies. While cost may appear to be a universally applicable barometer of project conditions, it is actually a single dimensional manifestation of a complex set of conditions. As such, variations in cost estimates can be caused by a variety of underlying factors such as changes in scope, schedule, performing organization, economic conditions, or regulatory environment. This paper will examine the subject of cost estimates by evaluating three different cost estimates prepared for a single project including two estimates prepared by project proponents and another estimate prepared by a review team. The paper identifies the reasons for cost growth as measured by the different estimates and evaluates the ability of review estimates to measure the validity of costs. The comparative technique used to test the three cost estimates will identify the reasons for changes in the estimated cost, over time, and evaluate the ability of an independent review to correctly identify the reasons for cost growth and evaluate the reasonableness of the cost proposed by the project proponents. Recommendations are made for improved cost estimates and improved cost estimate reviews. Conclusions are reached regarding the differences in estimate results that can be attributed to differences in estimating techniques, the implications of these differences for decision makers, and circumstances that are unique to environmental cost estimating. (author)

  16. Recommendations for NRC policy on shift scheduling and overtime at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, P.M.

    1985-07-01

    This report contains the Pacific Northwest Laboratory's (PNL's) recommendations to the US Nuclear Regulatory Commission (NRC) for an NRC policy on shift scheduling and hours of work (including overtime) for control room operators and other safety-related personnel in nuclear power plants. First, it is recommended that NRC make three additions to its present policy on overtime: (1) limit personnel to 112 hours of work in a 14-day period, 192 hours in 28 days, and 2260 hours in one year; exceeding these limits would require plant manager approval; (2) add a requirement that licensees obtain approval from NRC if plant personnel are expected to exceed 72 hours of work in a 7-day period, 132 hours in 14 days, 228 hours in 28 days, and 2300 hours in one year; and (3) make the policy a requirement, rather than a nonbinding recommendation. Second, it is recommended that licensees be required to obtain NRC approval to adopt a routine 12-hour/day shift schedule. Third, it is recommended that NRC add several nonbinding recommendations concerning routine 8-hour/day schedules. Finally, because additional data can strengthen the basis for future NRC policy on overtime, five methods are suggested for collecting data on overtime and its effects. 44 refs., 10 tabs.

  17. Recommendations for NRC policy on shift scheduling and overtime at nuclear power plants

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1985-07-01

    This report contains the Pacific Northwest Laboratory's (PNL's) recommendations to the US Nuclear Regulatory Commission (NRC) for an NRC policy on shift scheduling and hours of work (including overtime) for control room operators and other safety-related personnel in nuclear power plants. First, it is recommended that NRC make three additions to its present policy on overtime: (1) limit personnel to 112 hours of work in a 14-day period, 192 hours in 28 days, and 2260 hours in one year; exceeding these limits would require plant manager approval; (2) add a requirement that licensees obtain approval from NRC if plant personnel are expected to exceed 72 hours of work in a 7-day period, 132 hours in 14 days, 228 hours in 28 days, and 2300 hours in one year; and (3) make the policy a requirement, rather than a nonbinding recommendation. Second, it is recommended that licensees be required to obtain NRC approval to adopt a routine 12-hour/day shift schedule. Third, it is recommended that NRC add several nonbinding recommendations concerning routine 8-hour/day schedules. Finally, because additional data can strengthen the basis for future NRC policy on overtime, five methods are suggested for collecting data on overtime and its effects. 44 refs., 10 tabs

  18. Transition projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Cartmell, D.B.

    1994-09-01

    This reference contains information about the deactivation of the Purex Process Plant located on the Hanford Reservation. This document consists of a tabular schedule of events covering the next three years.

  19. Transition projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1. Volume 4

    International Nuclear Information System (INIS)

    Cartmell, D.B.

    1994-09-01

    This reference contains information about the deactivation of the Purex Process Plant located on the Hanford Reservation. This document consists of a tabular schedule of events covering the next three years

  20. Off-Line and Dynamic Production Scheduling – A Comparative Case Study

    Directory of Open Access Journals (Sweden)

    Bożek Andrzej

    2016-03-01

    Full Text Available A comprehensive case study of manufacturing scheduling solutions development is given. It includes highly generalized scheduling problem as well as a few scheduling modes, methods and problem models. The considered problem combines flexible job shop structure, lot streaming with variable sublots, transport times, setup times, and machine calendars. Tabu search metaheuristic and constraint programming methods have been used for the off-line scheduling. Two dynamic scheduling methods have also been implemented, i.e., dispatching rules for the completely reactive scheduling and a multi-agent system for the predictivereactive scheduling. In these implementations three distinct models of the problem have been used, based on: graph representation, optimal constraint satisfaction, and Petri net formalism. Each of these solutions has been verified in computational experiments. The results are compared and some findings about advantages, disadvantages, and suggestions on using the solutions are formulated.

  1. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  2. Scheduling for the National Hockey League Using a Multi-objective Evolutionary Algorithm

    Science.gov (United States)

    Craig, Sam; While, Lyndon; Barone, Luigi

    We describe a multi-objective evolutionary algorithm that derives schedules for the National Hockey League according to three objectives: minimising the teams' total travel, promoting equity in rest time between games, and minimising long streaks of home or away games. Experiments show that the system is able to derive schedules that beat the 2008-9 NHL schedule in all objectives simultaneously, and that it returns a set of schedules that offer a range of trade-offs across the objectives.

  3. Choice between Single and Multiple Reinforcers in Concurrent-Chains Schedules

    Science.gov (United States)

    Mazur, James E.

    2006-01-01

    Pigeons responded on concurrent-chains schedules with equal variable-interval schedules as initial links. One terminal link delivered a single reinforcer after a fixed delay, and the other terminal link delivered either three or five reinforcers, each preceded by a fixed delay. Some conditions included a postreinforcer delay after the single…

  4. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  5. Car painting process scheduling with harmony search algorithm

    Science.gov (United States)

    Syahputra, M. F.; Maiyasya, A.; Purnamawati, S.; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Automotive painting program in the process of painting the car body by using robot power, making efficiency in the production system. Production system will be more efficient if pay attention to scheduling of car order which will be done by considering painting body shape of car. Flow shop scheduling is a scheduling model in which the job-job to be processed entirely flows in the same product direction / path. Scheduling problems often arise if there are n jobs to be processed on the machine, which must be specified which must be done first and how to allocate jobs on the machine to obtain a scheduled production process. Harmony Search Algorithm is a metaheuristic optimization algorithm based on music. The algorithm is inspired by observations that lead to music in search of perfect harmony. This musical harmony is in line to find optimal in the optimization process. Based on the tests that have been done, obtained the optimal car sequence with minimum makespan value.

  6. Revised data taking schedule with ion beams

    CERN Document Server

    Gazdzicki, Marek; Aduszkiewicz, A; Andrieu, B; Anticic, T; Antoniou, N; Argyriades, J; Asryan, A G; Baatar, B; Blondel, A; Blumer, J; Boldizsar, L; Bravar, A; Brzychczyk, J; Bubak, A; Bunyatov, S A; Choi, K U; Christakoglou, P; Chung, P; Cleymans, J; Derkach, D A; Diakonos, F; Dominik, W; Dumarchez, J; Engel, R; Ereditato, A; Feofilov, G A; Fodor, Z; Ferrero, A; Gazdzicki, M; Golubeva, M; Grebieszkow, K; Grzeszczuk, A; Guber, F; Hasegawa, T; Haungs, A; Igolkin, S; Ivanov, A S; Ivashkin, A; Kadija, K; Katrynska, N; Kielczewska, D; Kikola, D; Kisiel, J; Kobayashi, T; Kolesnikov, V I; Kolev, D; Kolevatov, R S; Kondratiev, V P; Kowalski, S; Kurepin, A; Lacey, R; Laszlo, A; Lyubushkin, V V; Majka, Z; I Malakhov, A; Marchionni, A; Marcinek, A; Maris, I; Matveev, V; Melkumov, G L; Meregaglia, A; Messina, M; Mijakowski, P; Mitrovski, M; Montaruli, T; Mrówczynski, St; Murphy, S; Nakadaira, T; Naumenko, P A; Nikolic, V; Nishikawa, K; Palczewski, T; Pálla, G; Panagiotou, A D; Peryt, W; Planeta, R; Pluta, J; Popov, B A; Posiadala, M; Przewlocki, P; Rauch, W; Ravonel, M; Renfordt, R; Röhrich, D; Rondio, E; Rossi, B; Roth, M; Rubbia, A; Rybczynski, M; Sadovskii, A; Sakashita, K; Schuster, T; Sekiguchi, T; Seyboth, P; Shibata, M; Sissakian, A N; Skrzypczak, E; Slodkowski, M; Sorin, A S; Staszel, P; Stefanek, G; Stepaniak, J; Strabel, C; Ströbele, H; Susa, T; Szentpétery, I; Szuba, M; Tada, M; Taranenko, A; Tsenov, R; Ulrich, R; Unger, M; Vassiliou, M; Vechernin, V V; Vesztergombi, G; Wlodarczyk, Z; Wojtaszek, A; Zipper, W; CERN. Geneva. SPS and PS Experiments Committee; SPSC

    2009-01-01

    This document presents the revised data taking schedule of NA61 with ion beams. The revision takes into account limitations due to the new LHC schedule as well as final results concerning the physics performance with secondary ion beams. It is proposed to take data with primary Ar and Xe beams in 2012 and 2014, respectively, and to test and use for physics a secondary B beam from primary Pb beam fragmentation in 2010, 2011 and 2013.

  7. Mixed Criticality Scheduling for Industrial Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Xi Jin

    2016-08-01

    Full Text Available Wireless sensor networks (WSNs have been widely used in industrial systems. Their real-time performance and reliability are fundamental to industrial production. Many works have studied the two aspects, but only focus on single criticality WSNs. Mixed criticality requirements exist in many advanced applications in which different data flows have different levels of importance (or criticality. In this paper, first, we propose a scheduling algorithm, which guarantees the real-time performance and reliability requirements of data flows with different levels of criticality. The algorithm supports centralized optimization and adaptive adjustment. It is able to improve both the scheduling performance and flexibility. Then, we provide the schedulability test through rigorous theoretical analysis. We conduct extensive simulations, and the results demonstrate that the proposed scheduling algorithm and analysis significantly outperform existing ones.

  8. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  9. Sleep schedules and school performance in Indigenous Australian children.

    Science.gov (United States)

    Blunden, Sarah; Magee, Chris; Attard, Kelly; Clarkson, Larissa; Caputi, Peter; Skinner, Timothy

    2018-04-01

    Sleep duration and sleep schedule variability have been related to negative health and well-being outcomes in children, but little is known about Australian Indigenous children. Data for children aged 7-9 years came from the Australian Longitudinal Study of Indigenous Children and the National Assessment Program-Literacy and Numeracy (NAPLAN). Latent class analysis determined sleep classes taking into account sleep duration, bedtimes, waketimes, and variability in bedtimes from weekdays to weekends. Regression models tested whether the sleep classes were cross-sectionally associated with grade 3 NAPLAN scores. Latent change score modeling then examined whether the sleep classes predicted changes in NAPLAN performance from grades 3 to 5. Five sleep schedule classes were identified: normative sleep, early risers, long sleep, variable sleep, and short sleep. Overall, long sleepers performed best, with those with reduced sleep (short sleepers and early risers) performing the worse on grammar, numeracy, and writing performance. Latent change score results also showed that long sleepers performed best in spelling and writing and short sleepers and typical sleepers performed the worst over time. In this sample of Australian Indigenous children, short sleep was associated with poorer school performance compared with long sleep, with this performance worsening over time for some performance indicators. Other sleep schedules (eg, early wake times and variable sleep) also had some relationships with school performance. As sleep scheduling is modifiable, this offers opportunity for improvement in sleep and thus performance outcomes for these and potentially all children. Copyright © 2018 National Sleep Foundation. Published by Elsevier Inc. All rights reserved.

  10. Optimal imaging surveillance schedules after liver-directed therapy for hepatocellular carcinoma.

    Science.gov (United States)

    Boas, F Edward; Do, Bao; Louie, John D; Kothary, Nishita; Hwang, Gloria L; Kuo, William T; Hovsepian, David M; Kantrowitz, Mark; Sze, Daniel Y

    2015-01-01

    To optimize surveillance schedules for the detection of recurrent hepatocellular carcinoma (HCC) after liver-directed therapy. New methods have emerged that allow quantitative analysis and optimization of surveillance schedules for diseases with substantial rates of recurrence such as HCC. These methods were applied to 1,766 consecutive chemoembolization, radioembolization, and radiofrequency ablation procedures performed on 910 patients between 2006 and 2011. Computed tomography or magnetic resonance imaging performed just before repeat therapy was set as the time of "recurrence," which included residual and locally recurrent tumor as well as new liver tumors. Time-to-recurrence distribution was estimated by Kaplan-Meier method. Average diagnostic delay (time between recurrence and detection) was calculated for each proposed surveillance schedule using the time-to-recurrence distribution. An optimized surveillance schedule could then be derived to minimize the average diagnostic delay. Recurrence is 6.5 times more likely in the first year after treatment than in the second. Therefore, screening should be much more frequent in the first year. For eight time points in the first 2 years of follow-up, the optimal schedule is 2, 4, 6, 8, 11, 14, 18, and 24 months. This schedule reduces diagnostic delay compared with published schedules and is cost-effective. The calculated optimal surveillance schedules include shorter-interval follow-up when there is a higher probability of recurrence and longer-interval follow-up when there is a lower probability. Cost can be optimized for a specified acceptable diagnostic delay or diagnostic delay can be optimized within a specified acceptable cost. Copyright © 2015 SIR. Published by Elsevier Inc. All rights reserved.

  11. Comparison Performance of Genetic Algorithm and Ant Colony Optimization in Course Scheduling Optimizing

    Directory of Open Access Journals (Sweden)

    Imam Ahmad Ashari

    2016-11-01

    Full Text Available Scheduling problems at the university is a complex type of scheduling problems. The scheduling process should be carried out at every turn of the semester's. The core of the problem of scheduling courses at the university is that the number of components that need to be considered in making the schedule, some of the components was made up of students, lecturers, time and a room with due regard to the limits and certain conditions so that no collision in the schedule such as mashed room, mashed lecturer and others. To resolve a scheduling problem most appropriate technique used is the technique of optimization. Optimization techniques can give the best results desired. Metaheuristic algorithm is an algorithm that has a lot of ways to solve the problems to the very limit the optimal solution. In this paper, we use a genetic algorithm and ant colony optimization algorithm is an algorithm metaheuristic to solve the problem of course scheduling. The two algorithm will be tested and compared to get performance is the best. The algorithm was tested using data schedule courses of the university in Semarang. From the experimental results we conclude that the genetic algorithm has better performance than the ant colony optimization  algorithm in solving the case of course scheduling.

  12. 78 FR 21858 - Schedules of Controlled Substances: Temporary Placement of Three Synthetic Cannabinoids Into...

    Science.gov (United States)

    2013-04-12

    ...), FDA acts as the lead agency within HHS in carrying out the Secretary's scheduling responsibilities... mixtures of these substances for the purpose of achieving intoxication has been identified as a reason for...

  13. 78 FR 28735 - Schedules of Controlled Substances: Temporary Placement of Three Synthetic Cannabinoids Into...

    Science.gov (United States)

    2013-05-16

    ... Abuse (NIDA), FDA acts as the lead agency within HHS in carrying out the Secretary's scheduling... of these substances for the purpose of achieving intoxication has been identified as a reason for...

  14. Three-dimensional triaxial testing of marine sediments

    International Nuclear Information System (INIS)

    Nelson, J.D.; Thompson, E.G.

    1981-01-01

    The purpose of this investigation has been to develop testing methods and upgrade equipment for the determination of shear strength of and constitutive relationships for ocean bottom sediments under true three dimensional triaxial states of stress. The research to date has utilized existing 3-D triaxial equipment capable of controlling the three principal stresses independently of each other. Experiments are currently concerned with up-grading the equipment for use with ocean bottom cohesive soils. In addition, stage triaxial tests using conventional laboratory test equipment are being performed

  15. Persons with major psychiatric illness in prisons--a three years study.

    Science.gov (United States)

    Banerjee, Arnab; Sengupta, Prativa; Ray, Tapas Kumar

    2009-01-01

    A research project entitled 'operation oasis' was implemented in West Bengal prisons by SEVAC, supported by the National Human Rights Commission of India for identification of the persons suffering from major psychiatric illnesses (ie, schizophrenia, psychosis not otherwise specified, mood disorder not otherwise specified) in prisons, making arrangements for their psychiatric treatment and rehabilitation and assessing the changes in them after intervention. Dum Dum Central Jail, Presidency Jail (female section), and Berhampore Central Jail were selected as the project fields. The prison inmates were screened through clinical examination and mental state examination. Among them who were found suffering from mental illness were brought under psychiatric and psychological treatment, rehabilitation and restoration. Their sociodemographical data were also collected on the basis of a structured information schedule developed by the SEVAC team. The patients were followed-up for three consecutive years (2001 to 2004). The global assessment of functioning scores of the patients recorded at the time of initiation and completion of project were compared. During the project implementation period, 3871 prison inmates (male 3527 + female 344) were screened and 10% (n = 401) were identified as suffering from major psychiatric illnesses, of which 64% (n = 258) were housed in the prisons for minor offences/stray cases and 90% (n = 363) were undertrials. The findings concluded with a global assessment of functioning score improvement with a statistical significance of p treatment and rehabilitation.

  16. Influence of intravenous self-administered psychomotor stimulants on performance of rhesus monkeys in a multiple schedule paradigm.

    Science.gov (United States)

    Hoffmeister, F

    1980-01-01

    Rhesus monkeys were trained to complete three multiple schedules. The schedules consisted of three components: a fixed interval (component 1), a variable interval (component 2), and a fixed ratio (component 3). During components 1 and 2, pressing lever 1 was always reinforced by food delivery. During component 3, pressing lever 2 resulted in either food delivery or intravenous infusions of saline solution, solutions of cocaine, of d-amphetamine, of phenmetrazine, or fenetylline. In schedule I, animals were presented with all three components independent of key-pressing behavior during components 1 and 2. In schedule II the availability of component 2 was dependent on completion of component 1. Component 3 was made available only on completion of component 2. Noncompletion of components 1 or 2 resulted in time-out of 15 and 10 min, respectively. Schedule III was identical with schedule II, except that in schedule III the completion of components was indicated only by a change in the lever lights. The influence of self-administered drugs on behavior in all three components was evaluated. Self-administration of psychomotor stimulants impaired the performance of animals and delayed completion of components 1 and 2 of schedules I, II, and III. The effects on behavior were similar with low drug intake in schedule III, moderate intake in schedule II, and high drug intake in schedule I. These effects were strong with self-administration of phenmetrazine, moderate with self-administration of cocaine and d-amphetamine, and weak with self-administration of fenetylline.

  17. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  18. First decade: TVA's first ten years of nuclear power plant design and construction experience

    International Nuclear Information System (INIS)

    Willis, W.F.

    1978-01-01

    This paper reviews the experience of the Tennessee Valley Authority's design and construction program for nuclear power plants in terms of schedule and capital costs in three separate phases. Phase one recapitulates the status of the nuclear power industry in 1966 and sets forth the assumptions used for estimating capital costs and projecting schedules for the first Tennessee Valley Authority units. Phase two describes what happened to the program in the hectic early 1970s in terms of expansion of scope (particularly for safety features), the dramatic increase in regulatory requirements, vendor problems, stretchout of project schedules, and unprecented inflation. Phase three addresses the assumptions used today in estimating schedules and plant costs for the next 10-year period. 7 figures, 7 tables

  19. Automatic scheduling of maintenance work in nuclear power plants

    International Nuclear Information System (INIS)

    Kasahara, T.; Nishizawa, Y.; Kato, K.; Kiguchi, T.

    1987-01-01

    An automatic scheduling method for maintenance work in nuclear power plants has been developed using an AI technique. The purpose of this method is to help plant operators by adjusting the time schedule of various kinds of maintenance work so that incorrect ordering or timing of plant manipulations does not cause undersirable results, such as a plant trip. The functions of the method were tested by off-line simulations. The results show that the method can produce a satisfactory schedule of plant component manipulations without interference between the tasks and plant conditions

  20. Multi-objective group scheduling with learning effect in the cellular manufacturing system

    Directory of Open Access Journals (Sweden)

    Mohammad Taghi Taghavi-fard

    2011-01-01

    Full Text Available Group scheduling problem in cellular manufacturing systems consists of two major steps. Sequence of parts in each part-family and the sequence of part-family to enter the cell to be processed. This paper presents a new method for group scheduling problems in flow shop systems where it minimizes makespan (Cmax and total tardiness. In this paper, a position-based learning model in cellular manufacturing system is utilized where processing time for each part-family depends on the entrance sequence of that part. The problem of group scheduling is modeled by minimizing two objectives of position-based learning effect as well as the assumption of setup time depending on the sequence of parts-family. Since the proposed problem is NP-hard, two meta heuristic algorithms are presented based on genetic algorithm, namely: Non-dominated sorting genetic algorithm (NSGA-II and non-dominated rank genetic algorithm (NRGA. The algorithms are tested using randomly generated problems. The results include a set of Pareto solutions and three different evaluation criteria are used to compare the results. The results indicate that the proposed algorithms are quite efficient to solve the problem in a short computational time.

  1. On Multiple Users Scheduling Using Superposition Coding over Rayleigh Fading Channels

    KAUST Repository

    Zafar, Ammar

    2013-02-20

    In this letter, numerical results are provided to analyze the gains of multiple users scheduling via superposition coding with successive interference cancellation in comparison with the conventional single user scheduling in Rayleigh blockfading broadcast channels. The information-theoretic optimal power, rate and decoding order allocation for the superposition coding scheme are considered and the corresponding histogram for the optimal number of scheduled users is evaluated. Results show that at optimality there is a high probability that only two or three users are scheduled per channel transmission block. Numerical results for the gains of multiple users scheduling in terms of the long term throughput under hard and proportional fairness as well as for fixed merit weights for the users are also provided. These results show that the performance gain of multiple users scheduling over single user scheduling increases when the total number of users in the network increases, and it can exceed 10% for high number of users

  2. Three-year-old boy presenting in thyrotoxicosis.

    Science.gov (United States)

    Glick, J E; Wright, P E

    1998-02-01

    Thyrotoxicosis secondary to Graves' disease developed in a 3-year-old black boy with no previous history of thyroid disease. Thyrotoxicosis is a rare disorder of childhood that is characterized by an accelerated metabolism of body tissues which results from the stimulation of thyroid gland activity induced through a variety of autoantibodies. Historically, less than 5% of all incidents of Graves' disease occur in childhood, and recent studies show an incidence as low as 0.000001%. It is three to eight times more prevalent in females than in males and increases in incidence throughout childhood and adolescence. More than two thirds of childhood cases occur between the ages of 10 and 15 years. A review of the medical literature illustrates that less than 2% of hyperthyroid children in recorded cases are younger than 4 years. Records from Children's Hospital of Oklahoma in Oklahoma City support the unusual nature of this case, the hospital having seen only three children younger than 4 years requiring thyroid ablation therapy in 17 years. Physicians should consider Graves' disease in any child with clinical manifestations of hyperthyroidism, regardless of the age.

  3. Missed deadline notification in best-effort schedulers

    Science.gov (United States)

    Banachowski, Scott A.; Wu, Joel; Brandt, Scott A.

    2003-12-01

    It is common to run multimedia and other periodic, soft real-time applications on general-purpose computer systems. These systems use best-effort scheduling algorithms that cannot guarantee applications will receive responsive scheduling to meet deadline or timing requirements. We present a simple mechanism called Missed Deadline Notification (MDN) that allows applications to notify the system when they do not receive their desired level of responsiveness. Consisting of a single system call with no arguments, this simple interface allows the operating system to provide better support for soft real-time applications without any a priori information about their timing or resource needs. We implemented MDN in three different schedulers: Linux, BEST, and BeRate. We describe these implementations and their performance when running real-time applications and discuss policies to prevent applications from abusing MDN to gain extra resources.

  4. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  5. EFFECTIVENESS OF SCHEDULED AMBULATION ON EARLY POSTOPERATIVE OUTCOME AMONG PATIENTS WHO HAVE UNDERGONE ABDOMINAL HYSTERECTOMY

    Directory of Open Access Journals (Sweden)

    Rinku Girija

    2017-01-01

    Full Text Available BACKGROUND Abdominal hysterectomy is one of the most frequently performed surgical procedures in women. The non-ambulatory postoperative period is a high risk period for the development of various complications like wound infection, venous stasis, lower respiratory infection, secondary haemorrhage, deep vein thrombosis, pulmonary embolism, paralytic ileus etc. Prolonged surgery, delayed ambulation and not feeding the patient within 48 hours of surgery are often associated with post-operative morbidity and mortality. This study aims to assess the effectiveness of Scheduled Ambulation on early post-operative outcome among patients undergone abdominal hysterectomy by introduction of Scheduled Ambulation from second day of surgery. MATERIALS AND METHODS Method used is quantitative and quasi experimental post-test control method. Scheduled ambulation technique and pattern were taught pre operatively to 35 patients consecutively selected from general and post-operative ward who formed the experimental group. They were given scheduled ambulation from second to fifth post-operative days and results analysed. Another 35 patients taken as control were given the routine post-operative care. Data Analysis- was performed using SPSS version 17.0. Between group comparisons, quantitative variables analysed by Chisquare test p value >0, 05 considered significant. RESULTS The indication of hysterectomy was fibroid uterus in 80% of the control group and 88, 6% of the experimental group. 51.4% of the hysterectomies were encountered in the age group 40-49 years. There was a statistically significant reduction in the severity of pain, fatigue, postural hypotension and risk for developing Deep vein thrombosis in the experimental group on practicing Scheduled Ambulation from second to fifth post-operative days. CONCLUSION Scheduled ambulation helped the abdominal hysterectomy patients to recover from fatigue, pain, postural hypotension and risk for Deep vein thrombosis

  6. An Extended Flexible Job Shop Scheduling Model for Flight Deck Scheduling with Priority, Parallel Operations, and Sequence Flexibility

    Directory of Open Access Journals (Sweden)

    Lianfei Yu

    2017-01-01

    Full Text Available Efficient scheduling for the supporting operations of aircrafts in flight deck is critical to the aircraft carrier, and even several seconds’ improvement may lead to totally converse outcome of a battle. In the paper, we ameliorate the supporting operations of carrier-based aircrafts and investigate three simultaneous operation relationships during the supporting process, including precedence constraints, parallel operations, and sequence flexibility. Furthermore, multifunctional aircrafts have to take off synergistically and participate in a combat cooperatively. However, their takeoff order must be restrictively prioritized during the scheduling period accorded by certain operational regulations. To efficiently prioritize the takeoff order while minimizing the total time budget on the whole takeoff duration, we propose a novel mixed integer liner programming formulation (MILP for the flight deck scheduling problem. Motivated by the hardness of MILP, we design an improved differential evolution algorithm combined with typical local search strategies to improve computational efficiency. We numerically compare the performance of our algorithm with the classical genetic algorithm and normal differential evolution algorithm and the results show that our algorithm obtains better scheduling schemes that can meet both the operational relations and the takeoff priority requirements.

  7. Cassini RTG's -- Small scale module tests

    International Nuclear Information System (INIS)

    Kelly, C.E.; Klee, P.M.

    1994-01-01

    The Cassini spacecraft, scheduled for a 1997 launch to Saturn, will be powered by three GPHS RTGs (General Purpose Heat Source Radioisotope thermoelectric Generators). The RTGs are the same type as those powering the Galileo and Ulysses spacecraft. Three new converters (F-6, F-7, and F-8) are to be built and one converter (F-2) remaining from the GPHS program will be used. F-6 and F-7 are to be fueled and F-8 serves as a spare converter. In addition, the back-up RTG (F-5) from the Ulysses launch, which is still fueled, will serve as the Cassini back-up RTG. The new RTGs will have a lower fuel loading than in the past and will provide a minimum of 276 watts each at B.O.M. (beginning of mission). The mission length is 10.75 years, at which time these RTGs will provide a minimum of 216 watts and a possible extension to 16 years when the power will be 199 watts. This paper discusses tests performed to date to confirm the successful re-establishment of the unicouple production at Martin Marietta. This production line, shut down 10 years ago, has been restarted and over 1,500 unicouples have been produced to date. Confirmation will be primarily obtained by the performance of three small scale converters in comparison with previously tested modules from the Multi Hundred Watt (MHW) (Voyager) and GPHS (Galileo, Ulysses) programs. Test results to date have shown excellent agreement with the data base

  8. Simultaneous optimization of planning and scheduling in an oil refinery

    NARCIS (Netherlands)

    Zondervan, E.; van Boekel, T.P.J.; Fransoo, J.C.; Haan, de A.B.; Postikopoulos, E.N.; Georgiadis, M.C.; Kokossis, A.

    2011-01-01

    In earlier work we have developed and tested a scheduling model [1] in the AIMMS software. In this follow-up contribution we will develop a planning model. Next we will identify the information flow between scheduling model and the planning model. Lastly we will integrate the two models in a

  9. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  10. Goal programming for cyclical auxiliary police scheduling at UiTM Cawangan Perlis

    Science.gov (United States)

    Mustapar, Wasilatul Effah; Nasir, Diana Sirmayunie Mohd; Nor, Nor Azriani Mohamad; Abas, Sharifah Fhahriyah Syed

    2017-11-01

    Constructing a good and fair schedule for shift workers poses a great challenge as it requires a lot of time and effort. In this study, goal programming has been applied on scheduling to achieve the hard and soft constraints for a cyclical schedule that would ease the head of auxiliary police at building new schedules. To accomplish this goal, shift types were assigned in order to provide a fair schedule that takes into account the auxiliary police's policies and preferences. The model was run using Lingo software. Three out of four goals set for the study were achieved. In addition, the results considered an equal allocation for every auxiliary police, namely 70% for total duty and 30% for the day. Furthermore, the schedule was able to cyclically generate another 10 sets schedule. More importantly, the model has provided unbiased scheduling of auxiliary policies which led to high satisfaction in auxiliary police management.

  11. Components installation. Scheduling techniques applied at Framatome for the French nuclear program

    International Nuclear Information System (INIS)

    Cremese, G.

    1982-09-01

    The first scheduling objective is a timely delivery of heavy components manufactured by FRAMATOME factories: reactor vessel, steam generators and pressurizer. The second scheduling function is the preparation and updating of overall and detailed schedules for the coordination and follow-up of: design activities, progress at equipment suppliers, construction and erection activities of sub-contractors, test and start-up tasks by FRAMATOME and customer teams, and maintenance operations by FRAMATOME teams. I shall first describe the schedules for the contract first unit then show how the following units of the contract are scheduled in their turn

  12. Examining the Cultural Validity of Fear Survey Schedule for Children: The Contemporary Fears of Turkish Children and Adolescents

    Science.gov (United States)

    Serim-Yildiz, Begum; Erdur-Baker, Ozgur

    2013-01-01

    The authors examined the cultural validity of Fear Survey Schedule for Children (FSSC-AM) developed by J. J. Burnham (2005) with Turkish children. The relationships between demographic variables and the level of fear were also tested. Three independent data sets were used. The first data set comprised 676 participants (321 women and 355 men) and…

  13. Marihuana in Man: Three Years Later

    Science.gov (United States)

    Hollister, Leo E.

    1971-01-01

    Reviews three years of research on the effects of marihuana in man. Previously known clinical mental and physical effects have been confirmed. Causes and mechanisms of these effects generally remain undetermined in man and animals. Social implications and long term effects require additional study, although usage appears detrimental. (JM)

  14. An Evaluation of Parallel Job Scheduling for ASCI Blue-Pacific

    International Nuclear Information System (INIS)

    Franke, H.; Jann, J.; Moreira, J.; Pattnaik, P.; Jette, M.

    1999-01-01

    In this paper we analyze the behavior of a gang-scheduling strategy that we are developing for the ASCI Blue-Pacific machines. Using actual job logs for one of the ASCI machines we generate a statistical model of the current workload with hyper Erlang distributions. We then vary the parameters of those distributions to generate various workloads, representative of different operating points of the machine. Through simulation we obtain performance parameters for three different scheduling strategies: (i) first-come first-serve, (ii) gang-scheduling, and (iii) backfilling. Our results show that backfilling, can be very effective for the common operating points in the 60-70% utilization range. However, for higher utilization rates, time-sharing techniques such as gang-scheduling offer much better performance

  15. Evolutionary approaches for scheduling a flexible manufacturing system with automated guided vehicles and robots

    Directory of Open Access Journals (Sweden)

    Ramaraj Natarajan

    2012-08-01

    Full Text Available This paper addresses the scheduling of machines, an Automated Guided Vehicle (AGV and two robots in a Flexible Manufacturing System (FMS formed in three loop layouts, with objectives to minimize the makespan, mean flow time and mean tardiness. The scheduling optimization is carried out using Sheep Flock Heredity Algorithm (SFHA and Artificial Immune System (AIS algorithm. AGV is used for carrying jobs between the Load/Unload station and the machines. The robots are used for loading and unloading the jobs in the machines, and also used for transferring jobs between the machines. The algorithms are applied for test problems taken from the literature and the results obtained using the two algorithms are compared. The results indicate that SFHA performs better than AIS for this problem.

  16. The applicability of knowledge-based scheduling to the utilities industry

    International Nuclear Information System (INIS)

    Yoshimoto, G.; Gargan, R. Jr.; Duggan, P.

    1992-01-01

    The Electric Power Research Institute (EPRI), Nuclear Power Division, has identified the three major goals of high technology applications for nuclear power plants. These goals are to enhance power production through increasing power generation efficiency, to increase productivity of the operations, and to reduce the threats to the safety of the plant. Our project responds to the second goal by demonstrating that significant productivity increases can be achieved for outage maintenance operations based on existing knowledge-based scheduling technology. Its use can also mitigate threats to potential safety problems by means of the integration of risk assessment features into the scheduler. The scheduling approach uses advanced techniques enabling the automation of the routine scheduling decision process that previously was handled by people. The process of removing conflicts in scheduling is automated. This is achieved by providing activity representations that allow schedulers to express a variety of different scheduling constraints and by implementing scheduling mechanisms that simulate kinds of processes that humans use to find better solutions from a large number of possible solutions. This approach allows schedulers to express detailed constraints between activities and other activities, resources (material and personnel), and requirements that certain states exist for their execution. Our scheduler has already demonstrated its benefit to improving the shuttle processing flow management at Kennedy Space Center. Knowledge-based scheduling techniques should be examined by utilities industry researchers, developers, operators and management for application to utilities planning problems because of its great cost benefit potential. 4 refs., 4 figs

  17. The EMU after Three Years: Lessons and Challenges

    OpenAIRE

    Peter Bofinger

    2002-01-01

    The first three years of European Monetary Union provide a good basis for a comprehensive analysis of this unprecedented and controversial monetary arrangement. The paper starts with a short discussion of the recent changeover to Euro notes and coins and the general difficulties with the European Central Bank was confronted during the last three years. It then analyses the performance of the common monetary policy in terms of price stability and real growth and in terms of the important task ...

  18. Stochastic short-term maintenance scheduling of GENCOs in an oligopolistic electricity market

    International Nuclear Information System (INIS)

    Fotouhi Ghazvini, Mohammad Ali; Canizes, Bruno; Vale, Zita; Morais, Hugo

    2013-01-01

    Highlights: ► Decision making under uncertainty. ► Stochastic Mixed Integer Quadratic Programming applied to short-term maintenance scheduling. ► Outage scheduling in Oligopolistic electricity markets. ► Generation companies maintenance scheduling. -- Abstract: In the proposed model, the independent system operator (ISO) provides the opportunity for maintenance outage rescheduling of generating units before each short-term (ST) time interval. Long-term (LT) scheduling for 1 or 2 years in advance is essential for the ISO and the generation companies (GENCOs) to decide their LT strategies; however, it is not possible to be exactly followed and requires slight adjustments. The Cournot-Nash equilibrium is used to characterize the decision-making procedure of an individual GENCO for ST intervals considering the effective coordination with LT plans. Random inputs, such as parameters of the demand function of loads, hourly demand during the following ST time interval and the expected generation pattern of the rivals, are included as scenarios in the stochastic mixed integer program defined to model the payoff-maximizing objective of a GENCO. Scenario reduction algorithms are used to deal with the computational burden. Two reliability test systems were chosen to illustrate the effectiveness of the proposed model for the ST decision-making process for future planned outages from the point of view of a GENCO.

  19. Employee Responses to Flexible Work Schedules: An Inter-Organization, Inter-System Comparison.

    Science.gov (United States)

    Pierce, Jon L.; Newstrom, John W.

    1982-01-01

    Compared employee affective and behavioral responses to four work schedules--a fixed-hour schedule and three variations of flexible working hours. Hypothesized systematic differences in employee responses reflecting increased flexibility were not supported. Employees generally responded more favorably to flexible hour systems as contrasted with…

  20. A studentized permutation test for three-arm trials in the 'gold standard' design.

    Science.gov (United States)

    Mütze, Tobias; Konietschke, Frank; Munk, Axel; Friede, Tim

    2017-03-15

    The 'gold standard' design for three-arm trials refers to trials with an active control and a placebo control in addition to the experimental treatment group. This trial design is recommended when being ethically justifiable and it allows the simultaneous comparison of experimental treatment, active control, and placebo. Parametric testing methods have been studied plentifully over the past years. However, these methods often tend to be liberal or conservative when distributional assumptions are not met particularly with small sample sizes. In this article, we introduce a studentized permutation test for testing non-inferiority and superiority of the experimental treatment compared with the active control in three-arm trials in the 'gold standard' design. The performance of the studentized permutation test for finite sample sizes is assessed in a Monte Carlo simulation study under various parameter constellations. Emphasis is put on whether the studentized permutation test meets the target significance level. For comparison purposes, commonly used Wald-type tests, which do not make any distributional assumptions, are included in the simulation study. The simulation study shows that the presented studentized permutation test for assessing non-inferiority in three-arm trials in the 'gold standard' design outperforms its competitors, for instance the test based on a quasi-Poisson model, for count data. The methods discussed in this paper are implemented in the R package ThreeArmedTrials which is available on the comprehensive R archive network (CRAN). Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  1. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  2. Physical Activity and Sedentary Time among Young Children in Full-Day Kindergarten: Comparing Traditional and Balanced Day Schedules

    Science.gov (United States)

    Vanderloo, Leigh M.; Tucker, Patricia

    2017-01-01

    Objective: To compare physical activity and sedentary time among young children whose schools adhere to traditional (i.e. three outdoor playtimes = 70 minutes) versus balanced day (i.e. two outdoor playtimes = ~55 minutes) schedules in Ontario full-day kindergarten classrooms. Design: The project was part of a larger, 2-year cross-sectional study.…

  3. Extended Year, Extended Contracts: Increasing Teacher Salary Options.

    Science.gov (United States)

    Gandara, Patricia

    1992-01-01

    Reports on an attempt to raise teacher salaries through an extended contract made possible through year-round school schedules. Teacher satisfaction with the 1987 experiment in three California schools (the Orchard Plan) has been high. Elements that have contributed to job satisfaction are discussed. (SLD)

  4. The scheduling of repeat cesarean section operations: prospective management protocol experience.

    Science.gov (United States)

    Read, J A

    1985-03-01

    There are benefits to patients and a busy obstetric service if repeat cesarean section operations are performed on a scheduled basis. Optimum management avoids prematurity and reduces the need for amniocentesis. Over a period of 20 months repeat cesarean sections were performed at Tripler Army Medical Center while a protocol with the following elements was used: (1) known last menstrual period; (2) landmarks: positive urine human chorionic gonadotropin test by 6 weeks, Doppler fetal heart tone by 12 weeks, date determination by examination before 10 weeks, fetoscope fetal heart tone by 20 weeks, and date determination by size before 30 weeks; (3) date determination by midtrimester sonogram(s); (4) normal third-trimester glucose screening; (5) biparietal diameter of 9.2 or 9.5 cm before scheduling. With two or more clinical landmarks and one date by sonogram or one landmark and date by two sonograms, elective repeat cesarean section was scheduled at 39 weeks if the biparietal diameter was greater than or equal to 9.2 cm (127). If dates by sonogram were less than dates by last menstrual period but greater than 1 week or if last menstrual period was unknown, dates by sonogram and landmarks corresponding to dates by sonogram were used to electively schedule, with biparietal diameters of 9.2 or 9.5 cm respectively required (28). If protocol criteria were not met or earlier delivery was indicated (e.g., vertical scar or diabetes), amniocentesis was performed (42), except when not possible, advisable, or refused when patients either elected labor (20) or were scheduled if three or more criteria for 40+ weeks were met (18). Of 225 patients (70.5%) scheduled by protocol (173), amniocentesis (34), or medical indication (18), 188 (58.9%) were delivered without labor. In the 147 patients (46.1%) delivered electively by protocol without labor or amniocentesis, there were no cases of respiratory distress syndrome and the mean birth weight was 3517 gm. With early care and better

  5. 50 CFR 34.6 - Schedule of appraisals.

    Science.gov (United States)

    2010-10-01

    ... Secretary shall make fair market value appraisals of areas administered by the Service within five years... reappraised on a schedule of at least once every five years. Until areas are appraised, the fair market value... fee lands added to such areas after that date shall be on the basis of fair market value. ...

  6. Visual Working Memory and Perception Speed of 3- to 6-Year-Old Children Tested with a Matrix Film Battery Test

    Science.gov (United States)

    Pittorf, Martin L.; Lehmann, Wolfgang; Huckauf, Anke

    2014-01-01

    In this study the visual working memory (VWM) and perception speed of 60 children between the ages of three and six years were tested with an age-based, easy-to-handle Matrix Film Battery Test (reliability R?=?0.71). It was thereby affirmed that the VWM is age dependent (correlation coefficient r?=?0.66***) as expected. Furthermore, a significant…

  7. A real-time Excel-based scheduling solution for nursing staff reallocation.

    Science.gov (United States)

    Tuominen, Outi Anneli; Lundgren-Laine, Heljä; Kauppila, Wiveka; Hupli, Maija; Salanterä, Sanna

    2016-09-30

    Aim This article describes the development and testing of an Excel-based scheduling solution for the flexible allocation and reallocation of nurses to cover sudden, unplanned absences among permanent nursing staff. Method A quasi-experimental, one group, pre- and post-test study design was used ( Box 1 ) with total sampling. Participants (n=17) were selected purposefully by including all ward managers (n=8) and assistant ward managers (n=9) from one university hospital department. The number of sudden absences among the nursing staff was identified during two 4-week data collection periods (pre- and post-test). Results During the use of the paper-based scheduling system, 121 absences were identified; during the use of the Excel-based system, 106 were identified. The main reasons for the use of flexible 'floating' nurses were sick leave (n=66) and workload (n=31). Other reasons (n=29) included patient transfer to another hospital, scheduling errors and the start or end of employment. Conclusion The Excel-based scheduling solution offered better support in obtaining substitute labour inside the organisation, with smaller employment costs. It also reduced the number of tasks ward managers had to carry out during the process of reallocating staff.

  8. The Test Blanket Modules project in Europe: From the strategy to the technical plan over next ten years

    International Nuclear Information System (INIS)

    Poitevin, Y.; Zmitko, M.; Orco, G. dell; Laesser, R.; Diegele, E.; Sundstroem, J.; Boccaccini, L.; Salavy, J.-F.

    2006-01-01

    The testing of Breeding Blanket concepts in ITER is recognized as an essential milestone in the development of a future reactor ensuring tritium self-sufficiency, extraction of high grade heat and electricity production. Europe is currently developing two reference breeding blankets for DEMO reactor specifications that will be tested in ITER: the Helium-Cooled Lithium-Lead (HCLL) blanket which uses the eutectic Pb-15. 7 Li as both breeder and neutron multiplier, and the Helium-Cooled Pebble-Bed (HCPB) blanket which features lithiated ceramic pebbles (Li 4 SiO 4 or Li 2 TiO 3 ) as breeder and beryllium pebbles as neutron multiplier. Both blankets are using the pressurized He technology for heat extraction (8 MPa, inlet/outlet temperature 300/500 o C) and a 9% CrWVTa Reduced Activation Ferritic Martensitic (RAFM) steel as structural material, the EUROFER. Referring to the so called '' fast-track '' EU scenario, those concepts are intended to be tested in ITER, getting the maximum of information required for launching the DEMO blanket design and construction after the first 10 years of ITER operation. For that, the EU has adopted a blanket testing strategy based on the development of Test Blanket Modules (TBMs) that are expected to use DEMO relevant technologies and are designed for each ITER plasma phase to optimize the feedback and to avoid any impact on ITER availability. Following the decision on ITER construction, the EU has reviewed and detailed the fundamental elements for an implementation of the future EU TBMs Project aimed at delivering TBMs Systems to ITER under suitable schedule and acceptance standards. For that the following items have been analyzed in detail and are reported in the present paper: · Impact of the ITER environment (design, standards, schedule, operational scheme) on the TBM systems design and development plan · Project technical plan with focus on the next ten years up to the installation of the first TBMs in ITER · Project risk

  9. Fabrication of seamless calandria tubes by cold pilgering route using 3-pass and 2-pass schedules

    Science.gov (United States)

    Saibaba, N.

    2008-12-01

    Calandria tube is a large diameter, extremely thin walled zirconium alloy tube which has diameter to wall thickness ratio as high as 90-95. Such tubes are conventionally produced by the 'welded route', which involves extrusion of slabs followed by a series of hot and cold rolling passes, intermediate anneals, press forming of sheets into circular shape and closing the gap by TIG welding. Though pilgering is a well established process for the fabrication of seamless tubes, production of extremely thin walled tubes offers several challenges during pilgering. Nuclear fuel complex (NFC), Hyderabad, has successfully developed a process for the production of Zircaloy-4 calandria tubes by adopting the 'seamless route' which involves hot extrusion of mother blanks followed by three-pass pilgering or two-pass pilgering schedules. This paper deals with standardization of the seamless route processes for fabrication of calandria tubes, comparison between the tubes produced by 2-pass and 3-pass pilgering schedules, role of ultrasonic test charts for control of process parameters, development of new testing methods for burst testing and other properties.

  10. Fabrication of seamless calandria tubes by cold pilgering route using 3-pass and 2-pass schedules

    International Nuclear Information System (INIS)

    Saibaba, N.

    2008-01-01

    Calandria tube is a large diameter, extremely thin walled zirconium alloy tube which has diameter to wall thickness ratio as high as 90-95. Such tubes are conventionally produced by the 'welded route', which involves extrusion of slabs followed by a series of hot and cold rolling passes, intermediate anneals, press forming of sheets into circular shape and closing the gap by TIG welding. Though pilgering is a well established process for the fabrication of seamless tubes, production of extremely thin walled tubes offers several challenges during pilgering. Nuclear fuel complex (NFC), Hyderabad, has successfully developed a process for the production of Zircaloy-4 calandria tubes by adopting the 'seamless route' which involves hot extrusion of mother blanks followed by three-pass pilgering or two-pass pilgering schedules. This paper deals with standardization of the seamless route processes for fabrication of calandria tubes, comparison between the tubes produced by 2-pass and 3-pass pilgering schedules, role of ultrasonic test charts for control of process parameters, development of new testing methods for burst testing and other properties

  11. Freezing the Master Production Schedule Under Rolling Planning Horizons

    OpenAIRE

    V. Sridharan; William L. Berry; V. Udayabhanu

    1987-01-01

    The stability of the Master Production Schedule (MPS) is a critical issue in managing production operations with a Material Requirements Planning System. One method of achieving stability is to freeze some portion or all of the MPS. While freezing the MPS can limit the number of schedule changes, it can also produce an increase in production and inventory costs. This paper examines three decision variables in freezing the MPS: the freezing method, the freeze interval length, and the planning ...

  12. Schedule and status of irradiation experiments

    International Nuclear Information System (INIS)

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-01-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has four irradiation experiments in reactor, and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments

  13. Examining Master Schedule Practices in Rio Grande Valley Schools: Effects on Student Attendance, Discipline, and Grade Point Averages

    Science.gov (United States)

    Carriaga, Benito T.

    2012-01-01

    This study evaluated the impact of the master schedule design on student attendance, discipline, and grade point averages. Unexcused and excused absences, minor and major infraction, and grade point averages in three high schools during the 2008-09 and 2009-10 school years were included in the study. The purpose was to examine if any difference…

  14. Spent Fuel Test - Climax: technical measurements. Interim report, fiscal year 1982

    International Nuclear Information System (INIS)

    Patrick, W.C.; Ballou, L.B.; Butkovich, T.R.

    1983-02-01

    The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on the Nevada Test Site. The test is being conducted for the US Department of Energy (DOE) under the technical direction of the Lawrence Livermore National Laboratory (LLNL). Eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized April to May 1980, thus initiating a test with a planned 3- to 5-year fuel storage phase. The SFT-C operational objective of demonstrating the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner has been met. Three exchanges of spent fuel between the SFT-C and a surface storage facility furthered this demonstration. Technical objectives of the test led to development of a technical measurements program, which is the subject of this and two previous interim reports. Geotechnical, seismological, and test status data have been recorded on a continuing basis for the first 2-1/2 years of the test on more than 900 channels. Data continue to be acquired from the test. Some data are now available for analysis and are presented here. Highlights of activities this year include analysis of fracture data obtained during site characterization, laboratory studies of radiation effects and drilling damage in Climax granite, improved calculations of near-field heat transfer and thermomechanical response, a ventilation effects study, and further development of the data acquisition and management systems

  15. Basic Features of Customer Satisfaction with Train Schedules

    Science.gov (United States)

    Murakoshi, Akiko; Kunimatsu, Taketoshi; Saito, Ayano

    This paper aims to reveal the fundamental features of customer satisfaction with train schedules, which is one of the most basic services provided by a railway company. A customer satisfaction survey of passengers who frequently utilize three lines in the metropolitan area was conducted; we obtained the following findings: (a) out of nine factors to evaluate a train schedule from a passenger's viewpoint, the four most important ones are the frequency of trains running, punctuality, congestion rate, and time distance; (b) the ride-frequency influences the degree of satisfaction with train schedules in a particular line; and (c) it is important to set a numeric goal for the level of customer satisfaction by grasping the relationship between the transport service and a passenger's satisfaction with that service. The difference between customer satisfaction and passenger disutility is also discussed. The findings are expected to help conduct customer satisfaction surveys and also to form the basis for establishing a method by which to evaluate a train schedule from passengers' satisfaction ratings.

  16. Computer-aided resource planning and scheduling for radiological services

    Science.gov (United States)

    Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.

    1996-05-01

    There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.

  17. Research on information models for the construction schedule management based on the IFC standard

    Directory of Open Access Journals (Sweden)

    Weirui Xue

    2015-05-01

    Full Text Available Purpose: The purpose of this article is to study the description and extension of the Industry Foundation Classes (IFC standard in construction schedule management, which achieves the information exchange and sharing among the different information systems and stakeholders, and facilitates the collaborative construction in the construction projects. Design/methodology/approach: The schedule information processing and coordination are difficult in the complex construction project. Building Information Modeling (BIM provides the platform for exchanging and sharing information among information systems and stakeholders based on the IFC standard. Through analyzing the schedule plan, implementing, check and control, the information flow in the schedule management is reflected based on the IDEF. According to the IFC4, the information model for the schedule management is established, which not only includes the each aspect of the schedule management, but also includes the cost management, the resource management, the quality management and the risk management. Findings: The information requirement for the construction schedule management can be summarized into three aspects: the schedule plan information, the implementing information and the check and control information. The three aspects can be described through the existing and extended entities of IFC4, and the information models are established. Originality/value: The main contribution of the article is to establish the construction schedule management information model, which achieves the information exchange and share in the construction project, and facilitates the development of the application software to meet the requirements of the construction project.

  18. Scheduling for energy and reliability management on multiprocessor real-time systems

    Science.gov (United States)

    Qi, Xuan

    Scheduling algorithms for multiprocessor real-time systems have been studied for years with many well-recognized algorithms proposed. However, it is still an evolving research area and many problems remain open due to their intrinsic complexities. With the emergence of multicore processors, it is necessary to re-investigate the scheduling problems and design/develop efficient algorithms for better system utilization, low scheduling overhead, high energy efficiency, and better system reliability. Focusing cluster schedulings with optimal global schedulers, we study the utilization bound and scheduling overhead for a class of cluster-optimal schedulers. Then, taking energy/power consumption into consideration, we developed energy-efficient scheduling algorithms for real-time systems, especially for the proliferating embedded systems with limited energy budget. As the commonly deployed energy-saving technique (e.g. dynamic voltage frequency scaling (DVFS)) will significantly affect system reliability, we study schedulers that have intelligent mechanisms to recuperate system reliability to satisfy the quality assurance requirements. Extensive simulation is conducted to evaluate the performance of the proposed algorithms on reduction of scheduling overhead, energy saving, and reliability improvement. The simulation results show that the proposed reliability-aware power management schemes could preserve the system reliability while still achieving substantial energy saving.

  19. A Dataset of Three Educational Technology Experiments on Differentiation, Formative Testing and Feedback

    Science.gov (United States)

    Haelermans, Carla; Ghysels, Joris; Prince, Fernao

    2015-01-01

    This paper describes a dataset with data from three individually randomized educational technology experiments on differentiation, formative testing and feedback during one school year for a group of 8th grade students in the Netherlands, using administrative data and the online motivation questionnaire of Boekaerts. The dataset consists of pre-…

  20. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  1. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  2. Motivation and Test Anxiety in Test Performance across Three Testing Contexts: The CAEL, CET, and GEPT

    Science.gov (United States)

    Cheng, Liying; Klinger, Don; Fox, Janna; Doe, Christine; Jin, Yan; Wu, Jessica

    2014-01-01

    This study examined test-takers' motivation, test anxiety, and test performance across a range of social and educational contexts in three high-stakes language tests: the Canadian Academic English Language (CAEL) Assessment in Canada, the College English Test (CET) in the People's Republic of China, and the General English Proficiency Test (GEPT)…

  3. Year-Round Irrigation Schedule for a Tomato–Maize Rotation System in Reservoir-Based Irrigation Schemes in Ghana

    Directory of Open Access Journals (Sweden)

    Ephraim Sekyi-Annan

    2018-05-01

    Full Text Available Improving irrigation management in semi-arid regions of Sub-Saharan Africa is crucial to respond to increasing variability in rainfall and overcome deficits in current irrigation schemes. In small-scale and medium-scale reservoir-based irrigation schemes in the Upper East region of Ghana, we explored options for improving the traditional, dry season irrigation practices and assessed the potential for supplemental irrigation in the rainy season. The AquaCrop model was used to (i assess current water management in the typical tomato-maize rotational system; (ii develop an improved irrigation schedule for dry season cultivation of tomato; and (iii determine the requirement for supplemental irrigation of maize in the rainy season under different climate scenarios. The improved irrigation schedule for dry season tomato cultivation would result in a water saving of 130–1325 mm compared to traditional irrigation practices, accompanied by approximately a 4–14% increase in tomato yield. The supplemental irrigation of maize would require 107–126 mm of water in periods of low rainfall and frequent dry spells, and 88–105 mm in periods of high rainfall and rare dry spells. Therefore, year-round irrigated crop production may be feasible, using water saved during dry season tomato cultivation for supplemental irrigation of maize in the rainy season.

  4. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  5. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  6. Application of Tabu Search Algorithm in Job Shop Scheduling

    Directory of Open Access Journals (Sweden)

    Betrianis Betrianis

    2010-10-01

    Full Text Available Tabu Search is one of local search methods which is used to solve the combinatorial optimization problem. This method aimed is to make the searching process of the best solution in a complex combinatorial optimization problem(np hard, ex : job shop scheduling problem, became more effective, in a less computational time but with no guarantee to optimum solution.In this paper, tabu search is used to solve the job shop scheduling problem consists of 3 (three cases, which is ordering package of September, October and November with objective of minimizing makespan (Cmax. For each ordering package, there is a combination for initial solution and tabu list length. These result then  compared with 4 (four other methods using basic dispatching rules such as Shortest Processing Time (SPT, Earliest Due Date (EDD, Most Work Remaining (MWKR dan First Come First Served (FCFS. Scheduling used Tabu Search Algorithm is sensitive for variables changes and gives makespan shorter than scheduling used by other four methods.

  7. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  8. Three-year follow-up of 500 patients with Graves' disease after radioiodine therapy

    International Nuclear Information System (INIS)

    Chen Yonghui; Jin Xiaona; Luo Yaping; Li Fang

    2012-01-01

    Objective: To investigate the incidence of early hypothyroidism and factors affecting the treatment effect of radioiodine therapy for Graves' disease (GD) at 3 years after treatment. Methods: Five hundred cases of GD were retrospectively studied. The mean age was (39.3±12.6) y, with a female to male ratio of 5 : 1. Data including symptoms, signs, blood tests, radioactive iodine uptake (RAIU), effective half-life, radioiodine doses, remission rates and hypothyroidism incidences were collected. Early hypothyroidism was also recorded. Student's t-test, χ 2 test and logistic regression were performed. Results: Three months after radioiodine therapy, the remission rate of GD was 63.8% (319/500). The hypothyroidism incidence was 36.6% (183/500). Six months after radioiodine therapy, the remission rate was 67.8% (339/500). The hypothyroidism incidence was 43.4% (217/500). Nine months after radioiodine therapy, the remission rate was 70.0% (350/500). The hypothyroidism incidence was 39.4% (197/500). One year after radioiodine therapy, the remission rate was 72.6% (363/500). The hypothyroidism incidence was 38.2% (191/500). Two years after radioiodine therapy, the remission rate was 79.6% (398/500). The hypothyroidism incidence was 40.8% (204/500). Three years after radioiodine therapy, the remission rate was 90.8% (454/500). The hypothyroidism incidence was 46.0% (230/500). Eighty-four cases were retreated (16.8%) due to treatment failure. Early hypothyroidism occurred in 260 cases. Among them, seventy cases were rendered euthyroid (26.9%). One hundred and seventy-eight cases still persisted in hypothyroidism while twelve cases relapsed during the second and third year. One hundred and ninety-two cases achieved euthyroidism and two hundred cases became hypothyroid three years after treatment. They were classified as a success group. The retreated eighty-four cases were classified as a failure group. ATD therapy (χ 2 =16.758, P<0.01), TRAb (t=-2.074, P=0

  9. Direct block scheduling technology: Analysis of Avidity

    Directory of Open Access Journals (Sweden)

    Felipe Ribeiro Souza

    Full Text Available Abstract This study is focused on Direct Block Scheduling testing (Direct Multi-Period Scheduling methodology which schedules mine production considering the correct discount factor of each mining block, resulting in the final pit. Each block is analyzed individually in order to define the best target period. This methodology presents an improvement of the classical methodology derived from Lerchs-Grossmann's initial proposition improved by Whittle. This paper presents the differences between these methodologies, specially focused on the algorithms' avidity. Avidity is classically defined by the voracious search algorithms, whereupon some of the most famous greedy algorithms are Branch and Bound, Brutal Force and Randomized. Strategies based on heuristics can accentuate the voracity of the optimizer system. The applied algorithm use simulated annealing combined with Tabu Search. The most avid algorithm can select the most profitable blocks in early periods, leading to higher present value in the first periods of mine operation. The application of discount factors to blocks on the Lerchs-Grossmann's final pit has an accentuated effect with time, and this effect may make blocks scheduled for the end of the mine life unfeasible, representing a trend to a decrease in reported reserves.

  10. Relationship between shift work schedule and self-reported sleep quality in Chinese employees.

    Science.gov (United States)

    Ma, Yifei; Wei, Fu; Nie, Guanghui; Zhang, Li'e; Qin, Jian; Peng, Suwan; Xiong, Feng; Zhang, Zhiyong; Yang, Xiaobo; Peng, Xiaowu; Wang, Mingjun; Zou, Yunfeng

    2018-02-01

    Few studies have reported on the effects of fixed and rotating shift systems on the prevalence of sleep disturbance. Thus, in this study, the relationships between different work schedules and sleep disturbance in Chinese workers were investigated. A total of 2180 workers aged 19-65 years responded to the self-report questionnaire on shift work schedule (fixed day-shift, fixed night-shift, two-shift or three-shift system), working hours a day, and working days a week, physical effort, subjective sleep quality and subjective mental state. It was found that the rotating shift workers, namely, two- and three-shift workers, exhibited higher risks of sleep disturbance than with the fixed day-shift workers did (OR 1.37; 95% CI 1.07to 1.74; and OR 2.19; 95% CI 1.52 to 3.15, respectively). The risk was particularly high among two- or three-shift workers who worked more than 8 hours a day or more than 5 days a week and among three-shift workers who reported both light and heavy physical effort at work. Moreover, the two- and three-shift workers (rotating shift workers) suffered from poorer sleep quality than the fixed night shift workers did (OR 1.84; 95% CI 1.01 to 3.32; and OR 2.94; 95% CI 1.53 to 5.64, respectively). Consequently, rotating shift work (two- and three-shift work) is a risk factor for sleep disturbance, and the fixed work rhythm may contribute to the quality of sleep.

  11. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  12. The Simultaneous Vehicle Scheduling and Passenger Service Problem

    DEFF Research Database (Denmark)

    Petersen, Hanne Løhmann; Larsen, Allan; Madsen, Oli B.G.

    2013-01-01

    , by modifying the timetable. The planning approach is referred to as the simultaneous vehicle scheduling and passenger service problem (SVSPSP). The SVSPSP is modelled as an integer programming problem and solved using a large neighborhood search metaheuristic. The proposed framework is tested on data inspired......Passengers using public transport systems often experience waiting times when transferring between two scheduled services. In this paper we propose a planning approach that seeks to obtain a favourable trade-off between the two contrasting objectives, passenger service and operating cost...

  13. Occupancy schedules for energy simulation in new prEN16798-1 and ISO/FDIS 17772-1 standards

    DEFF Research Database (Denmark)

    Ahmed, Kaiser; Akhondzada, Ali; Kurnitski, Jarek

    2017-01-01

    This study reports the development of occupancy, lighting and appliance hourly schedules for new energy calculation input data standards. Developed schedules apply for 10 building categories which are described by one to three space categories, and include the separation between weekdays and week......This study reports the development of occupancy, lighting and appliance hourly schedules for new energy calculation input data standards. Developed schedules apply for 10 building categories which are described by one to three space categories, and include the separation between weekdays......-1 standards, supported by appliances and lighting schedules which are similarly needed as energy calculation input data. Hourly schedules allow to model occupant behaviour effects, for instance the peak cooling load in an office room was increased by factor of 1.1–1.3 compared to the use of constant average...

  14. Preliminary ITER cost and schedule estimates

    International Nuclear Information System (INIS)

    1990-01-01

    The cost, manpower requirements, and schedule estimates for the realization of the ITER tokamak have been studied during the Conceptual Design Activities, as a result of work by the ITER Management Committee. This work was completed during the January-March, 1990 joint work session, and is presented in this report. A possible schedule shows completion of the engineering design phase in 1995, with 180 professionals, at a cost of about $250M. The construction would be completed in 2004 with a rise in professional staff to 300, and a total cost of $4900M. The machine would be operable over an 18-year period, at an annual operating cost averaging $290M. 2 figs

  15. Novel Hybrid Scheduling Technique for Sensor Nodes with Mixed Criticality Tasks

    Directory of Open Access Journals (Sweden)

    Mihai-Victor Micea

    2017-06-01

    Full Text Available Sensor networks become increasingly a key technology for complex control applications. Their potential use in safety- and time-critical domains has raised the need for task scheduling mechanisms specially adapted to sensor node specific requirements, often materialized in predictable jitter-less execution of tasks characterized by different criticality levels. This paper offers an efficient scheduling solution, named Hybrid Hard Real-Time Scheduling (H2RTS, which combines a static, clock driven method with a dynamic, event driven scheduling technique, in order to provide high execution predictability, while keeping a high node Central Processing Unit (CPU utilization factor. From the detailed, integrated schedulability analysis of the H2RTS, a set of sufficiency tests are introduced and demonstrated based on the processor demand and linear upper bound metrics. The performance and correct behavior of the proposed hybrid scheduling technique have been extensively evaluated and validated both on a simulator and on a sensor mote equipped with ARM7 microcontroller.

  16. Novel Hybrid Scheduling Technique for Sensor Nodes with Mixed Criticality Tasks.

    Science.gov (United States)

    Micea, Mihai-Victor; Stangaciu, Cristina-Sorina; Stangaciu, Valentin; Curiac, Daniel-Ioan

    2017-06-26

    Sensor networks become increasingly a key technology for complex control applications. Their potential use in safety- and time-critical domains has raised the need for task scheduling mechanisms specially adapted to sensor node specific requirements, often materialized in predictable jitter-less execution of tasks characterized by different criticality levels. This paper offers an efficient scheduling solution, named Hybrid Hard Real-Time Scheduling (H²RTS), which combines a static, clock driven method with a dynamic, event driven scheduling technique, in order to provide high execution predictability, while keeping a high node Central Processing Unit (CPU) utilization factor. From the detailed, integrated schedulability analysis of the H²RTS, a set of sufficiency tests are introduced and demonstrated based on the processor demand and linear upper bound metrics. The performance and correct behavior of the proposed hybrid scheduling technique have been extensively evaluated and validated both on a simulator and on a sensor mote equipped with ARM7 microcontroller.

  17. Florida Tech professor gets three-year grant

    CERN Multimedia

    2003-01-01

    "Dr. Marc Baarmand, Florida Tech associate professor of physics, has received a three-year grant from the U.S. Department of Energy's Division of High Energy Physics, to conduct research with the Compact Muon Solenoid experiment" (1/3 page).

  18. Olfactory Function, Eating Ability, and Visceral Obesity Associated with MMSE Three Years after Parkinson's Disease Diagnosis.

    Science.gov (United States)

    Vikdahl, M; Domellöf, M E; Forsgren, L; Håglin, L

    2015-11-01

    This study examines whether risk factors for poor nutrition are associated with global cognitive function three years after confirmed Parkinson's disease (PD) diagnosis. The follow-up investigations for this prospective community-based study were conducted three years after PD diagnosis. The study participants lived in Västerbotten County, a region in northern Sweden with 142,000 inhabitants. This study population consisted of 118 PD outpatients from the study of Newly Diagnosed PD in Umeå (NYPUM). Global cognition was assessed with the Mini Mental State Examination (MMSE) at baseline and at follow-up. Anthropometry, nutrition (Mini Nutritional Assessment, MNA, 3-day food registration, 3-FDR), olfactory function (Brief Smell Identification Test, B-SIT), and swallowing, cutting food, and salivation (single questions from the Unified Parkinson's Disease Rating Scale, UPDRS) were used as markers for nutritional status. The MMSE score decreased over three years (-1.06±3.38, p=0.001). Olfactory function at baseline was associated to MMSE at three years (B=0.365, p=0.004). Changes in waist/hip ratio (B=113.29, p=0.017), swallowing (B=1.18, P=0.033), and cutting food (B=-1.80, p=0.000) were associated with MMSE at follow-up. This study indicates that olfactory function, cutting food, swallowing, and visceral obesity are associated with MMSE three years after PD diagnosis.

  19. Scheduling in Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2015-01-01

    This issue presents five papers selected from the 2013 (4th) International Conference on Engineering, Project, and Production Management (EPPM2013) held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  20. Development of Milestone Schedules for Selected Logistics Support Directorate Programs. Appendix A. Part 2. Task Summaries.

    Science.gov (United States)

    1987-09-15

    LOGISTIC SUPPORT (ILS) COST ESTIMATE SCODE NUMBER: NONE -ESPONSIBILITY: ROY & ILS ’,!,RATION: 22.00 WORK DAYS A-221 * .9 ..- 9 * PAGE: .LSMTEST SCHEDULE: CE...0/ TIPO SCHEDULE: DV CONDUCT A PERFORMANCE DEMONSTRATION PRIOR TO TECHNICAL TEST CODE NUMBER: NONE (TT) I AND USER TEST (UT) I. RESPONSIBILITY...RESPONSIBILITY: BELVOIR LAB DURATION: 20.00 WORK DAYS ENG DE I SCHEDULE: DV ENGINEERING DESIGN INITIATED. CODE NUMBER: NONE RESPONSIBILITY: BELVOIR LAB

  1. Space network scheduling benchmark: A proof-of-concept process for technology transfer

    Science.gov (United States)

    Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy

    1993-01-01

    This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.

  2. 78 FR 14879 - Revision of Fee Schedules; Fee Recovery for Fiscal Year 2013

    Science.gov (United States)

    2013-03-07

    ... schedule; 5) The NRC could assess a fee for renewing a license to operate a low-level radioactive waste... upon small licensees and performed a trend analysis to calculate the appropriate fee tier levels. From... appropriate, except for topical reports whose costs exceed $50,000. Costs which exceed $50,000 for any topical...

  3. Performance evaluation of different types of particle representation procedures of Particle Swarm Optimization in Job-shop Scheduling Problems

    Science.gov (United States)

    Izah Anuar, Nurul; Saptari, Adi

    2016-02-01

    This paper addresses the types of particle representation (encoding) procedures in a population-based stochastic optimization technique in solving scheduling problems known in the job-shop manufacturing environment. It intends to evaluate and compare the performance of different particle representation procedures in Particle Swarm Optimization (PSO) in the case of solving Job-shop Scheduling Problems (JSP). Particle representation procedures refer to the mapping between the particle position in PSO and the scheduling solution in JSP. It is an important step to be carried out so that each particle in PSO can represent a schedule in JSP. Three procedures such as Operation and Particle Position Sequence (OPPS), random keys representation and random-key encoding scheme are used in this study. These procedures have been tested on FT06 and FT10 benchmark problems available in the OR-Library, where the objective function is to minimize the makespan by the use of MATLAB software. Based on the experimental results, it is discovered that OPPS gives the best performance in solving both benchmark problems. The contribution of this paper is the fact that it demonstrates to the practitioners involved in complex scheduling problems that different particle representation procedures can have significant effects on the performance of PSO in solving JSP.

  4. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  5. Cloud computing task scheduling strategy based on improved differential evolution algorithm

    Science.gov (United States)

    Ge, Junwei; He, Qian; Fang, Yiqiu

    2017-04-01

    In order to optimize the cloud computing task scheduling scheme, an improved differential evolution algorithm for cloud computing task scheduling is proposed. Firstly, the cloud computing task scheduling model, according to the model of the fitness function, and then used improved optimization calculation of the fitness function of the evolutionary algorithm, according to the evolution of generation of dynamic selection strategy through dynamic mutation strategy to ensure the global and local search ability. The performance test experiment was carried out in the CloudSim simulation platform, the experimental results show that the improved differential evolution algorithm can reduce the cloud computing task execution time and user cost saving, good implementation of the optimal scheduling of cloud computing tasks.

  6. A Hybrid Metaheuristic Approach for Minimizing the Total Flow Time in A Flow Shop Sequence Dependent Group Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Antonio Costa

    2014-07-01

    Full Text Available Production processes in Cellular Manufacturing Systems (CMS often involve groups of parts sharing the same technological requirements in terms of tooling and setup. The issue of scheduling such parts through a flow-shop production layout is known as the Flow-Shop Group Scheduling (FSGS problem or, whether setup times are sequence-dependent, the Flow-Shop Sequence-Dependent Group Scheduling (FSDGS problem. This paper addresses the FSDGS issue, proposing a hybrid metaheuristic procedure integrating features from Genetic Algorithms (GAs and Biased Random Sampling (BRS search techniques with the aim of minimizing the total flow time, i.e., the sum of completion times of all jobs. A well-known benchmark of test cases, entailing problems with two, three, and six machines, is employed for both tuning the relevant parameters of the developed procedure and assessing its performances against two metaheuristic algorithms recently presented by literature. The obtained results and a properly arranged ANOVA analysis highlight the superiority of the proposed approach in tackling the scheduling problem under investigation.

  7. 75 FR 76636 - Anthropomorphic Test Devices; Hybrid III 6-Year-Old Child Test Dummy, Hybrid III 6-Year-Old...

    Science.gov (United States)

    2010-12-09

    ... provision: ``When a motor vehicle safety standard is in effect under this chapter, a State or a political... [Docket No. NHTSA-2010-0147] RIN 2127-AK34 Anthropomorphic Test Devices; Hybrid III 6-Year-Old Child Test Dummy, Hybrid III 6-Year-Old Weighted Child Test Dummy AGENCY: National Highway Traffic Safety...

  8. CERN: A big year for LEP

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    In April this year's data-taking period for CERN's big LEP electron-positron collider got underway, and is scheduled to continue until November. The immediate objective of the four big experiments - Aleph, Delphi, L3 and Opal - will be to increase considerably their stock of carefully recorded Z decays, currently totalling about three-quarters of a million

  9. Two years of operating experience with the Seattle clinical neutron therapy facility

    International Nuclear Information System (INIS)

    Risler, R.; Brossard, S.; Eenmaa, J.; Kalet, I.; Wootton, P.

    1987-01-01

    After five years of planning, equipment acquisition, facility construction and beam testing the Seattle Clinical Neutron Therapy facility became operational in October 1984. In the past two years nearly 300 people have been treated in clinical trials. During this time 82 % of the planned treatment sessions were performed on schedule, 3 % had to be rescheduled for patient related reasons and 15 % because of equipment problems. The facility is at present running on a 5 days/week schedule: Three ten-hour treatment days, one maintenance day and one research day (radiobiology, therapy related physics). Short runs for short lived isotopes are done between patient treatments. The isocentric gantry, capable of 360 rotation is equipped with a variable collimator with 40 independent leaves. This collimation system allows the use of complex field shapes without the necessity of handling radioactive components like collimator inserts or blocks. It has turned out to be a very essential part for the efficient operation of the facility. Major causes for equipment downtime were associated with the control system, the beryllium target system, RF and magnet systems and the treatment gantry. (author)

  10. A Data Scheduling and Management Infrastructure for the TEAM Network

    Science.gov (United States)

    Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.; Unwin, R.

    2009-04-01

    TEAM protocols with the logistical scheduling needs of each TEAM Site. For example, each TEAM protocol defines when data must be collected (e.g. time of day, number of times per year, during which seasons, etc) as well as where data must be collected (from which sampling units, which trees, etc). Each TEAM Site has a limited number of resources and must create plans that will both satisfy the requirements of the protocols as well as be logistically feasible for their TEAM Site. With 15 TEAM Sites (and many more coming soon) the schedules of each TEAM Site must be communicated to the Network Office to ensure data are being collected as scheduled and to address the many problems when working in difficult environments like Tropical Forests. The Sampling Schedule provides built-in proposal and approval functionality to ensure that the TEAM Sites are and the Network office are in sync as well as provides the capability to modify schedules when needed. The Data Management Framework The Data Management framework is a three-tier data ingestion, edit and review application for protocols defined in the TEAM network. The data ingestion framework provides online web forms for field personnel to submit and edit data collected at TEAM Sites. These web forms will be accessible from the TEAM content management site. Once the data is securely uploaded, cured, processed and approved, it will be made publicly available for consumption by the scientific community. The Data Management framework, when combined with the Sampling Scheduler provides a closed loop Data Scheduling and Management infrastructure. All information starting from data collection plan, tools to input, modify and curate data, review and run QA/QC tests, as well as verify data are collected as planed are included. Finally, TEAM Network data are available for download via the Data Query and Download Application. This application utilizes a Google Maps custom interface to search, visualize, and download TEAM Network data

  11. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  12. Peer-to-peer Cooperative Scheduling Architecture for National Grid Infrastructure

    Science.gov (United States)

    Matyska, Ludek; Ruda, Miroslav; Toth, Simon

    For some ten years, the Czech National Grid Infrastructure MetaCentrum uses a single central PBSPro installation to schedule jobs across the country. This centralized approach keeps a full track about all the clusters, providing support for jobs spanning several sites, implementation for the fair-share policy and better overall control of the grid environment. Despite a steady progress in the increased stability and resilience to intermittent very short network failures, growing number of sites and processors makes this architecture, with a single point of failure and scalability limits, obsolete. As a result, a new scheduling architecture is proposed, which relies on higher autonomy of clusters. It is based on a peer to peer network of semi-independent schedulers for each site or even cluster. Each scheduler accepts jobs for the whole infrastructure, cooperating with other schedulers on implementation of global policies like central job accounting, fair-share, or submission of jobs across several sites. The scheduling system is integrated with the Magrathea system to support scheduling of virtual clusters, including the setup of their internal network, again eventually spanning several sites. On the other hand, each scheduler is local to one of several clusters and is able to directly control and submit jobs to them even if the connection of other scheduling peers is lost. In parallel to the change of the overall architecture, the scheduling system itself is being replaced. Instead of PBSPro, chosen originally for its declared support of large scale distributed environment, the new scheduling architecture is based on the open-source Torque system. The implementation and support for the most desired properties in PBSPro and Torque are discussed and the necessary modifications to Torque to support the MetaCentrum scheduling architecture are presented, too.

  13. Chocolate-candy consumption and three-year weight gain among postmenopausal U.S. women

    Science.gov (United States)

    Greenberg, James A.; Manson, JoAnn E.; Buijsse, Brian; Wang, Lu; Allison, Matthew A.; Neuhouser, Marian L.; Tinker, Lesley; Waring, Molly E.; Isasi, Carmen R.; Martin, Lisa W.; Thomson, Cynthia A.

    2014-01-01

    OBJECTIVE To test the hypothesis that greater chocolate-candy intake is associated with more weight gain in postmenopausal women. DESIGN AND METHODS Prospective cohort study involving 107,243 post-menopausal American women aged 50–79 years (mean=60.7) at enrolment in the Women’s Health Initiative (WHI), with three-year follow up. Chocolate-candy consumption was assessed by food frequency questionnaire and body weight was measured. Linear mixed models, adjusted for demographic, socio-economic, anthropomorphic and behavioral variables, were used to test our main hypotheses. RESULTS Compared to women who ate a 1 oz (~28 g) serving of chocolate candy chocolate-candy intake level increased as BMI increased above the normal range (18.5–25 kg/m2), and as age decreased. CONCLUSIONS Greater chocolate-candy intake was associated with greater prospective weight gain in this cohort of post-menopausal women. PMID:25644711

  14. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  15. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  16. Three years of an intensive Programme

    DEFF Research Database (Denmark)

    Pedersen, Jens Myrup; Lopez, Jose Manuel Guterrez Lopez; Kirikova, Marite

    2015-01-01

    points, we can highlight the importance of clearly communicating learning goals as well as motivations for the students to work problem-based and across traditional disciplines. Also, having short time to get a group from four different universities work together it is important to actively encourage (or......-12 teachers from the 4 participating universities would meet in the location of one of the partner institutions. During the three years, the programme was each year adjusted according to the observations and evaluations from the previous year. The course was organized as a week of course modules, followed...... by a week of project work. The topics of the first week were defined to support the project work in the following week. The projects were based on real-life problems proposed by companies, and had to be solved in student groups with a mix of nationalities and educational backgrounds. Among the key learning...

  17. Master schedule for CY-1981 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1980-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is provided. Questions about specific entries should be referred to the authors since modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Air quality data obtained in a separate program are also reported. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Schedules are presented for the following subjects: air, Columbia River, sanitary water, surface water, ground water, foodstuffs, wildlife, soil and vegetation, external radiation measurement, portable instrument surveys, and surveillance of waste disposal sites

  18. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  19. Hypothesis Designs for Three-Hypothesis Test Problems

    OpenAIRE

    Yan Li; Xiaolong Pu

    2010-01-01

    As a helpful guide for applications, the alternative hypotheses of the three-hypothesis test problems are designed under the required error probabilities and average sample number in this paper. The asymptotic formulas and the proposed numerical quadrature formulas are adopted, respectively, to obtain the hypothesis designs and the corresponding sequential test schemes under the Koopman-Darmois distributions. The example of the normal mean test shows that our methods are qu...

  20. Alcohol use in the first three years of bereavement: a national representative survey

    Directory of Open Access Journals (Sweden)

    Pilling János

    2012-01-01

    Full Text Available Abstract Background Earlier results concerning alcohol consumption of bereaved persons are contradictory. The aim of the present study was to analyze the relationship between bereavement and alcohol consumption accounting for time and gender differences on a nationally representative sample from Hungary ("Hungarostudy Epidemiological Panel Survey", N = 4457 Methods Drinking characteristics of mourning persons (alcohol consumption, dependence symptoms, and harmful consequences of alcohol use in the first three years of grief were examined among persons between 18-75 years using the Alcohol Use Disorders Identification Test (AUDIT. Results Men bereaved for one year scored higher on two dimensions of AUDIT (dependence symptoms and harmful alcohol use, while men bereaved for two years scored higher on all three dimensions of AUDIT compared to the non-bereaved. The rate of men clinically at-risk concerning alcohol consumption among the non-bereaved is 12.9%, and among men bereaved for one year is 18.4% (a non-significant difference, while 29.8% (p Conclusion Among bereaved men, the risk of alcohol related problems tends to be higher, which can be shown both among men bereaved for one year as well as men bereaved for two years. Considering the higher morbidity and mortality rates of bereaved men, alcohol consumption might play a mediator role. These facts draw attention to the importance of prevention, early recognition, and effective therapy of hazardous drinking in bereaved men.

  1. A Comparison of Three Tests of Mediation

    Science.gov (United States)

    Warbasse, Rosalia E.

    2009-01-01

    A simulation study was conducted to evaluate the performance of three tests of mediation: the bias-corrected and accelerated bootstrap (Efron & Tibshirani, 1993), the asymmetric confidence limits test (MacKinnon, 2008), and a multiple regression approach described by Kenny, Kashy, and Bolger (1998). The evolution of these methods is reviewed and…

  2. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  3. Computer-based irrigation scheduling for cotton crop

    International Nuclear Information System (INIS)

    Laghari, K.Q.; Memon, H.M.

    2008-01-01

    In this study a real time irrigation schedule for cotton crop has been tested using mehran model, a computer-based DDS (Decision Support System). The irrigation schedule was set on selected MAD (Management Allowable Depletion) and the current root depth position. The total 451 mm irrigation water applied to the crop field. The seasonal computed crop ET (Evapotranspiration) was estimated 421.32 mm and actual (ET/sub ca/) observed was 413 mm. The model over-estimated seasonal ET by only 1.94. WUE (Water Use Efficiency) for seed-cotton achieved 6.59 Kg (ha mm)/sup -1/. The statistical analysis (R/sup 2/=0.96, ARE%=2.00, T-1.17 and F=550.57) showed good performance of the model in simulated and observed ET values. The designed Mehran model is designed quite versatile for irrigation scheduling and can be successfully used as irrigation DSS tool for various crop types. (author)

  4. Impact of flexible scheduling on employee performance regarding stress and work-family conflict

    OpenAIRE

    Raja Abdul Ghafoor Khan; Furqan Ahmad Khan; Dr. Muhammad Aslam Khan; Mohsin Shakeel

    2011-01-01

    Stress, work-family conflicts and flexible scheduling are three of the most important elements in organizational studies. The focus of current study is to understand the effect of Stress,work family conflicts and flexible scheduling on employee’s performance and also to understand whether flexible scheduling helps in reducing stress and work-family conflicts or not. The back bone of this study is the secondary data comprised of comprehensive literature review. A survey has also been conducted...

  5. Real-time energy resources scheduling considering short-term and very short-term wind forecast

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Marco; Sousa, Tiago; Morais, Hugo; Vale, Zita [Polytechnic of Porto (Portugal). GECAD - Knowledge Engineering and Decision Support Research Center

    2012-07-01

    This paper proposes an energy resources management methodology based on three distinct time horizons: day-ahead scheduling, hour-ahead scheduling, and real-time scheduling. In each scheduling process the update of generation and consumption operation and of the storage and electric vehicles storage status are used. Besides the new operation conditions, the most accurate forecast values of wind generation and of consumption using results of short-term and very short-term methods are used. A case study considering a distribution network with intensive use of distributed generation and electric vehicles is presented. (orig.)

  6. Static Scheduling of Periodic Hardware Tasks with Precedence and Deadline Constraints on Reconfigurable Hardware Devices

    Directory of Open Access Journals (Sweden)

    Ikbel Belaid

    2011-01-01

    Full Text Available Task graph scheduling for reconfigurable hardware devices can be defined as finding a schedule for a set of periodic tasks with precedence, dependence, and deadline constraints as well as their optimal allocations on the available heterogeneous hardware resources. This paper proposes a new methodology comprising three main stages. Using these three main stages, dynamic partial reconfiguration and mixed integer programming, pipelined scheduling and efficient placement are achieved and enable parallel computing of the task graph on the reconfigurable devices by optimizing placement/scheduling quality. Experiments on an application of heterogeneous hardware tasks demonstrate an improvement of resource utilization of 12.45% of the available reconfigurable resources corresponding to a resource gain of 17.3% compared to a static design. The configuration overhead is reduced to 2% of the total running time. Due to pipelined scheduling, the task graph spanning is minimized by 4% compared to sequential execution of the graph.

  7. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  8. Scheduled, intermittent stimulation of the thalamus reduces tics in Tourette syndrome.

    Science.gov (United States)

    Rossi, P Justin; Opri, Enrico; Shute, Jonathan B; Molina, Rene; Bowers, Dawn; Ward, Herbert; Foote, Kelly D; Gunduz, Aysegul; Okun, Michael S

    2016-08-01

    Personalized, scheduled deep brain stimulation in Tourette syndrome (TS) may permit clinically meaningful tic reduction while reducing side effects and increasing battery life. Here, we evaluate scheduled DBS applied to TS at two-year follow-up. Five patients underwent bilateral centromedian thalamic (CM) region DBS. A cranially contained constant-current device delivering stimulation on a scheduled duty cycle, as opposed to the standard continuous DBS paradigm was utilized. Baseline vs. 24-month outcomes were collected and analyzed, and a responder analysis was performed. A 40% improvement in the Modified Rush Tic Rating Scale (MRTRS) total score or Yale Global Tic Severity Scale (YGTSS) total score defined a full responder. Three of the 4 patients followed to 24 months reached full responder criteria and had a mean stimulation time of 1.85 h per day. One patient lost to follow-up evaluated at the last time point (month 18) was a non-responder. Patients exhibited improvements in MRTRS score beyond the improvements previously reported for the 6 month endpoint; on average, MRTRS total score was 15.6% better at 24 months than at 6 months and YGTSS total score was 14.8% better. Combining the patients into a single cohort revealed significant improvements in the MRTRS total score (-7.6 [5.64]; p = 0.02). Electrical stimulation of the centromedian thalamic region in a scheduled paradigm was effective in suppressing tics, particularly phonic tics. Full responders were able to achieve the positive DBS effect with a mean of 2.3 ± 0.9 (SEM) hours of DBS per day. Copyright © 2016 Elsevier Ltd. All rights reserved.

  9. Simulated Stochastic Approximation Annealing for Global Optimization With a Square-Root Cooling Schedule

    KAUST Repository

    Liang, Faming; Cheng, Yichen; Lin, Guang

    2014-01-01

    cooling schedule, for example, a square-root cooling schedule, while guaranteeing the global optima to be reached when the temperature tends to zero. The new algorithm has been tested on a few benchmark optimization problems, including feed-forward neural

  10. The application of artificial intelligence to astronomical scheduling problems

    Science.gov (United States)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike

  11. A preliminary analysis of the reactor-based plutonium disposition alternative deployment schedules

    International Nuclear Information System (INIS)

    Zurn, R.M.

    1997-09-01

    This paper discusses the preliminary analysis of the implementation schedules of the reactor-based plutonium disposition alternatives. These schedule analyses are a part of a larger process to examine the nine decision criteria used to determine the most appropriate method of disposing of U.S. surplus weapons plutonium. The preliminary analysis indicates that the mission durations for the reactor-based alternatives range from eleven years to eighteen years and the initial mission fuel assemblies containing surplus weapons-usable plutonium could be loaded into the reactors between nine and fourteen years after the Record of Decision

  12. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  13. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  14. Comparing the performance of different meta-heuristics for unweighted parallel machine scheduling

    Directory of Open Access Journals (Sweden)

    Adamu, Mumuni Osumah

    2015-08-01

    Full Text Available This article considers the due window scheduling problem to minimise the number of early and tardy jobs on identical parallel machines. This problem is known to be NP complete and thus finding an optimal solution is unlikely. Three meta-heuristics and their hybrids are proposed and extensive computational experiments are conducted. The purpose of this paper is to compare the performance of these meta-heuristics and their hybrids and to determine the best among them. Detailed comparative tests have also been conducted to analyse the different heuristics with the simulated annealing hybrid giving the best result.

  15. Sleep scheduling with expected common coverage in wireless sensor networks

    OpenAIRE

    Bulut, Eyuphan; Korpeoglu, Ibrahim

    2011-01-01

    Sleep scheduling, which is putting some sensor nodes into sleep mode without harming network functionality, is a common method to reduce energy consumption in dense wireless sensor networks. This paper proposes a distributed and energy efficient sleep scheduling and routing scheme that can be used to extend the lifetime of a sensor network while maintaining a user defined coverage and connectivity. The scheme can activate and deactivate the three basic units of a sensor node (sensing, proces...

  16. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill

  17. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill.

  18. Staff Scheduling within the Retail Business in Denmark

    DEFF Research Database (Denmark)

    Leedgaard, Jesper; Mortensen, Kim H.; Larsen, Allan

    2002-01-01

    Staff Scheduling within the retail business deals with the assignment of employees such as shop assistants to work tasks so that the right number of employees are available at any given times and the total staff costs are minimized. In this paper the retail staff scheduling problem is formulated...... as a Mixed Integer Problem. The retail staff scheduling problem is solved using the metaheuristic {\\$\\backslash\\$it Simulated Annealing}. The heuristic is implemented by modifying the original MIP model. Some of the constraints defined in the MIP are relaxed, entered into the objective function and weighted...... according to their relative importance. The problem is then formulated as minimizing the overall constraint violation. A thorough parameter test has been applied to the developed heuristics. The developed system has successfully been implemented in a number of shops and stores in Denmark....

  19. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  20. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  1. Software Schedules Missions, Aids Project Management

    Science.gov (United States)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  2. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  3. Peri-implant evaluation of osseointegrated implants subjected to orthodontic forces: results after three years of functional loading

    Directory of Open Access Journals (Sweden)

    Bruna de Rezende Marins

    2016-04-01

    Full Text Available ABSTRACT Objective: The objective of this study was to clinically and radiographically assess the peri-implant conditions of implants used as orthodontic anchorage. Methods: Two groups were studied: 1 a test group in which osseointegrated implants were used as orthodontic anchorage, with the application of 200-cN force; and 2 a control group in which implants were not subjected to orthodontic force, but supported a screw-retained prosthesis. Clinical evaluations were performed three, six and nine months after prosthesis installation and 1- and 3-year follow-up examinations. Intraoral periapical radiographs were obtained 30 days after surgical implant placement, at the time of prosthesis installation, and one, two and three years thereafter. The results were compared by Kruskal-Wallis test. Results: There was no statistically significant difference in clinical probing depth (p = 0.1078 or mesial and distal crestal bone resorption (p = 0.1832 during the study period. After three years of follow-up, the mean probing depth was 2.21 mm for the control group and 2.39 mm for the test group. The implants of the control group showed a mean distance between the bone crest and implant shoulder of 2.39 mm, whereas the implants used as orthodontic anchorage showed a mean distance of 2.58 mm at the distal site. Conclusion: Results suggest that the use of stable intraoral orthodontic anchorage did not compromise the health of peri-implant tissues or the longevity of the implant.

  4. THE IDEA OF HUMILITY IN ANTON CHEKHOV'S NOVELLA THREE YEARS

    Directory of Open Access Journals (Sweden)

    Vitaliy Yur’evich Darenskiy

    2014-11-01

    Full Text Available Anton Chekhov wrote his novella Three years in 1895, and this title could be chosen because it took Chekhov three years to finish it, given that entries from his diary dating back to 1891 were included into the novella. It is estimated that while preparing for writing this book Chekhov made about 200 notes. Therefore, Three years can be perceived as the author’s lengthy refl ection on life, materialized through some ‘alien’ story. One special thing about this book, however, is its ‘incompleteness’: there is no event at the end of the story which would draw a fi nal line — all we see is a series of open ends, so it seems that it all ends with nothing. Novella Three years is believed to be the first time when Chekhov used his new drama poetics in his prose, since his plays Uncle Vanya, Three Sisters and The Cherry Orchard also have ‘open ends’. Someone is leaving and something is happening there, but spiritual and real-life connections between people are not broken — they obviously await some development in the future. It means, then, that in Three years we see some new type of artistic integrity, which is created not by coherence of a seemingly completed plot line, but by inner cohesion of the life-transforming fl ow of events, representing reality with its inner unpredictability. What is even more important is that by completing his story Chekhov would probably destroy the inner integrity of his text.

  5. TAGUCHI METHOD FOR THREE-STAGE ASSEMBLY FLOW SHOP SCHEDULING PROBLEM WITH BLOCKING AND SEQUENCE-DEPENDENT SET UP TIMES

    Directory of Open Access Journals (Sweden)

    AREF MALEKI-DARONKOLAEI

    2013-10-01

    Full Text Available This article considers a three-stage assembly flowshop scheduling problem minimizing the weighted sum of mean completion time and makespan with sequence-dependent setup times at the first stage and blocking times between each stage. To tackle such an NP-hard, two meta-heuristic algorithms are presented. The novelty of our approach is to develop a variable neighborhood search algorithm (VNS and a well-known simulated annealing (SA for the problem. Furthermore, to enhance the performance of the (SA, its parameters are optimized by the use of Taguchi method, but to setting parameters of VNS just one parameter has been used without Taguchi. The computational results show that the proposed VNS is better in mean and standard deviation for all sizes of the problem than SA, but on the contrary about CPU Time SA outperforms VNS.

  6. An evaluation of vocational high schools in Indonesia: A comparison between four-year and three-year programs

    Directory of Open Access Journals (Sweden)

    Soenarto Soenarto

    2017-12-01

    Full Text Available The research aimed to gain insights into the quality of four-year program vocational high school (VHS in Indonesia compared to four-year program VHS. This research was conducted based on the school graduate standard, business sector and industrial sector (or Dunia Usaha dan Dunia Industri (DUDI – or the performance of the graduates and alumni (the graduates’ satisfaction. The research was conducted using Discrepancy Evaluation Model using 16 VHSs (eight four-year program VHSs and eight three-year program VHSs. The result shows that from the standpoint of the school, the graduates of the four-year program VHS are higher in quality than those of the three-year program VHS. The four-year program VHS graduates are more qualified in seven aspects: teamwork, discipline, tenacity, theoretical knowledge, confidence, creativity, and leadership. Meanwhile, using DUDI standpoint, the four-year program VHS graduates are also higher in quality than the three-year program VHS graduates. In addition, the four-year program VHS graduates are better in the quality of their discipline, tenacity, theoretical knowledge, practical skills, confidence, carefulness, creativity, and leadership. The four-year program VHS graduates have a higher level of satisfaction in terms of income than the three-year program VHS graduates. The higher quality of the four-year program VHS graduates has resulted from longer duration of the internship program (PKL that provides them with reliable experience and skills concerning work-related problem-solving activities.

  7. Real life study of three years omalizumab in patients with difficult-to-control asthma.

    Science.gov (United States)

    López Tiro, J Jesús; Contreras, E Angélica Contreras; del Pozo, M Elena Ramírez; Gómez Vera, J; Larenas Linnemann, D

    2015-01-01

    Even though there are multiple options for the treatment of asthma, there still exists a fair group of patients with difficult-to-control asthma. We describe for the first time the real-world effects of three-year omalizumab treatment on patients with difficult-to-control asthma, seen in a social security hospital in a Latin American country. Difficult-to-control asthmatic patients from the out-patient clinic of a regional hospital were recruited to receive a three-year omalizumab course. Efficacy parameters were asthma control test (ACT) score; FEV1; daily beclomethasone maintenance dose; and unplanned visits for asthma exacerbations (emergency room (ER), hospitalisations, intensive care). 52 patients were recruited, 47 completed the three-year treatment (42 female, 15-67 years, mean age 43.5). Comparing efficacy parameters of the year before omalizumab with the 3rd year of omalizumab: mean ACT improved from 12.4 to 20.5, mean FEV1 from 66.3% (standard deviation (SD) 19.1%) to 88.4% (SD 16.2%) of predicted, while mean beclomethasone dose reduced from 1750 to 766 mcg/day and there was a significant reduction in patients experiencing ER visits (from 95% to 19%, pomalizumab, two because of an adverse event (anaphylaxis, severe headache, both resolved without sequelae). Omalizumab improved most clinical parameters of Mexican patients with difficult-to-control asthma. Especially the rates of ER visits and hospitalisation were significantly reduced, thus reducing costs. Omalizumab was generally well tolerated. Copyright © 2013 SEICAP. Published by Elsevier Espana. All rights reserved.

  8. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  9. Three Years Experience of Third Year Undergraduate Medical Students in Different Teaching Learning Methods: A Qualitative Study

    Directory of Open Access Journals (Sweden)

    Ariarathinam Newtonraj

    2017-10-01

    Full Text Available Introduction: India is a second largest populous country producing more than sixty thousand doctors every year. Still in India research on teaching learning methods are subtle. To improve the quality of knowledge and skills of medical students, there is a need to analyse the existing teaching learning methods as well as innovating new methods. Aim: To compare the three years experience of third year MBBS (Bachelor of Medicine and Bachelor of Surgery students in three different teaching learning methods (Tutorials, Integrated Teaching sessions and Routine Lectures. Materials and Methods: Qualitative study was carried out among 60 third year MBBS students in medical college in south India. A semi-structured questionnaire was developed, with the help of literature review and is distributed among 66 students. Six participants excluded due to incomplete information. Questionnaire consisted of totally 16 questions. For the first ten questions answers were captured in Likert scale of one to five (one-poor; five- excellent. Eleventh to sixteenth questions were asked as an open-ended question to mention some positive and negative things about each method. Questions with Likert scale were analysed using Kruskal Wallis H Test and the open ended questions were analysed by thematic analysis. Results: Overall mean rank for Tutorial was 129.03 followed by Integrated Teaching (mean rank 86.33 and Routine Lecture (mean rank 56.14. Students gave better scores for Tutorials in areas such as easily understandable, better attention span and students involvement in the session. Students gave better scoring for Integrated Teaching in areas such as well organized, integration with other departments, ideal usage of audio visual aids and providing detailed information to the students. Drawbacks of Integrated Teaching were failure to attract the students, prolonged sessions (long duration, boring and minimal involvement of students. Lecture classes on the other hand

  10. Data location-aware job scheduling in the grid. Application to the GridWay metascheduler

    International Nuclear Information System (INIS)

    Delgado Peris, Antonio; Hernandez, Jose; Huedo, Eduardo; Llorente, Ignacio M

    2010-01-01

    Grid infrastructures constitute nowadays the core of the computing facilities of the biggest LHC experiments. These experiments produce and manage petabytes of data per year and run thousands of computing jobs every day to process that data. It is the duty of metaschedulers to allocate the tasks to the most appropriate resources at the proper time. Our work reviews the policies that have been proposed for the scheduling of grid jobs in the context of very data-intensive applications. We indicate some of the practical problems that such models will face and describe what we consider essential characteristics of an optimum scheduling system: aim to minimise not only job turnaround time but also data replication, flexibility to support different virtual organisation requirements and capability to coordinate the tasks of data placement and job allocation while keeping their execution decoupled. These ideas have guided the development of an enhanced prototype for GridWay, a general purpose metascheduler, part of the Globus Toolkit and member of the EGEE's RESPECT program. Current GridWay's scheduling algorithm is unaware of data location. Our prototype makes it possible for job requests to set data needs not only as absolute requirements but also as functions for resource ranking. As our tests show, this makes it more flexible than currently used resource brokers to implement different data-aware scheduling algorithms.

  11. Scottish Stroke Research Network: the first three years.

    Science.gov (United States)

    McCormick, K; Langhorne, P; Graham, F E J; McFarlane, C

    2010-08-01

    Research networks were introduced in the UK to facilitate and improve clinical research and stroke was seen as a priority topic for local research network development. The Scottish Stroke Research Network (SSRN) is one of 11 stroke research networks in the UK. In this article we review the progress of the Scottish Stroke Research Network in the three years since inception. Between 2006-2009 the number of active hospital research sites has increased from 10 to 22 expanding to involve 20 stroke research nurses. There was a corresponding 58% increase in recruitment of participants into stroke studies, from 376 in 2006/07 to 594 in 2008/09. The majority (17/20) of our current studies are interventional. Data from one of these, the CLOTs trial (Clots in Legs Or sTocking after Stroke), demonstrates that the annual recruitment in Scotland increased from a median of 94 (range 6-122) patients per year in the six years before the SSRN, to 140 (135-158) patients per year after SSRN involvement. We currently screen about 50% of Scottish stroke patients and approximately 5% of Scottish stroke patients are participating in research studies that we support. The SSRN has made good progress in the first three years. Increasing the recruitment of screened patients remains a challenge.

  12. Scheduling models in farm management : a new approach

    NARCIS (Netherlands)

    Wijngaard, P.J.M.

    1988-01-01

    Three operational planning models to calculate schedules for an arable farm are examined. These models are a linear programming model, a dynamic programming model and a simulation model. They are examined at different levels of aggregation and relaxation in a retrospective way. Also a

  13. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  14. Changed nursing scheduling for improved safety culture and working conditions - patients' and nurses' perspectives.

    Science.gov (United States)

    Kullberg, Anna; Bergenmar, Mia; Sharp, Lena

    2016-05-01

    To evaluate fixed scheduling compared with self-scheduling for nursing staff in oncological inpatient care with regard to patient and staff outcomes. Various scheduling models have been tested to attract and retain nursing staff. Little is known about how these schedules affect staff and patients. Fixed scheduling and self-scheduling have been studied to a small extent, solely from a staff perspective. We implemented fixed scheduling on two of four oncological inpatient wards. Two wards kept self-scheduling. Through a quasi-experimental design, baseline and follow-up measurements were collected among staff and patients. The Safety Attitudes Questionnaire was used among staff, as well as study-specific questions for patients and staff. Fixed scheduling was associated with less overtime and fewer possibilities to change shifts. Self-scheduling was associated with more requests from management for short notice shift changes. The type of scheduling did not affect patient-reported outcomes. Fixed scheduling should be considered in order to lower overtime. Further research is necessary and should explore patient outcomes to a greater extent. Scheduling is a core task for nurse managers. Our study suggests fixed scheduling as a strategy for managers to improve the effective use of resources and safety. © 2016 John Wiley & Sons Ltd.

  15. The nurse scheduling problem: a goal programming and nonlinear optimization approaches

    Science.gov (United States)

    Hakim, L.; Bakhtiar, T.; Jaharuddin

    2017-01-01

    Nurses scheduling is an activity of allocating nurses to conduct a set of tasks at certain room at a hospital or health centre within a certain period. One of obstacles in the nurse scheduling is the lack of resources in order to fulfil the needs of the hospital. Nurse scheduling which is undertaken manually will be at risk of not fulfilling some nursing rules set by the hospital. Therefore, this study aimed to perform scheduling models that satisfy all the specific rules set by the management of Bogor State Hospital. We have developed three models to overcome the scheduling needs. Model 1 is designed to schedule nurses who are solely assigned to a certain inpatient unit and Model 2 is constructed to manage nurses who are assigned to an inpatient room as well as at Polyclinic room as conjunct nurses. As the assignment of nurses on each shift is uneven, then we propose Model 3 to minimize the variance of the workload in order to achieve equitable assignment on every shift. The first two models are formulated in goal programming framework, while the last model is in nonlinear optimization form.

  16. Master schedule for CY-1982 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites

  17. Optimization models for flight test scheduling

    Science.gov (United States)

    Holian, Derreck

    As threats around the world increase with nations developing new generations of warfare technology, the Unites States is keen on maintaining its position on top of the defense technology curve. This in return indicates that the U.S. military/government must research, develop, procure, and sustain new systems in the defense sector to safeguard this position. Currently, the Lockheed Martin F-35 Joint Strike Fighter (JSF) Lightning II is being developed, tested, and deployed to the U.S. military at Low Rate Initial Production (LRIP). The simultaneous act of testing and deployment is due to the contracted procurement process intended to provide a rapid Initial Operating Capability (IOC) release of the 5th Generation fighter. For this reason, many factors go into the determination of what is to be tested, in what order, and at which time due to the military requirements. A certain system or envelope of the aircraft must be assessed prior to releasing that capability into service. The objective of this praxis is to aide in the determination of what testing can be achieved on an aircraft at a point in time. Furthermore, it will define the optimum allocation of test points to aircraft and determine a prioritization of restrictions to be mitigated so that the test program can be best supported. The system described in this praxis has been deployed across the F-35 test program and testing sites. It has discovered hundreds of available test points for an aircraft to fly when it was thought none existed thus preventing an aircraft from being grounded. Additionally, it has saved hundreds of labor hours and greatly reduced the occurrence of test point reflight. Due to the proprietary nature of the JSF program, details regarding the actual test points, test plans, and all other program specific information have not been presented. Generic, representative data is used for example and proof-of-concept purposes. Apart from the data correlation algorithms, the optimization associated

  18. Colour cues facilitate learning flower refill schedules in wild hummingbirds.

    Science.gov (United States)

    Samuels, Michael; Hurly, T Andrew; Healy, Susan D

    2014-11-01

    Free-living hummingbirds can learn the refill schedules of individual experimental flowers but little is known about what information they use to do this. Colour cues, in particular, may be important to hummingbirds when learning about rewarded flower properties. We investigated, therefore, whether colour cues facilitated the learning of flower refill schedules in wild, free-living rufous hummingbirds (Selasphorus rufus). In the Cued condition, we presented birds with an array of six flowers, three of one colour, each of which were refilled 10min after being emptied by the bird and three of a different colour, which were refilled 20min after being emptied. In the Uncued condition we presented birds with six flowers of the same colour, three of which were refilled after 10min and three of which were refilled after 20min as for the birds in the Cued condition. In the second part of the experiment, we moved the array 2m and changed the shape of the array. Across both phases, birds in the Cued condition learned to discriminate between 10 and 20-min flowers more quickly than did the birds in the Uncued condition. The Cued birds were also better at discriminating between the two distinct refill intervals. Colour cues can, therefore, facilitate learning the refill schedules of experimental flowers in these birds. This article is part of a Special Issue entitled: Cognition in the wild. Copyright © 2014 Elsevier B.V. All rights reserved.

  19. Intelligent scheduling of execution for customized physical fitness and healthcare system.

    Science.gov (United States)

    Huang, Chung-Chi; Liu, Hsiao-Man; Huang, Chung-Lin

    2015-01-01

    Physical fitness and health of white collar business person is getting worse and worse in recent years. Therefore, it is necessary to develop a system which can enhance physical fitness and health for people. Although the exercise prescription can be generated after diagnosing for customized physical fitness and healthcare. It is hard to meet individual execution needs for general scheduling of physical fitness and healthcare system. So the main purpose of this research is to develop an intelligent scheduling of execution for customized physical fitness and healthcare system. The results of diagnosis and prescription for customized physical fitness and healthcare system will be generated by fuzzy logic Inference. Then the results of diagnosis and prescription for customized physical fitness and healthcare system will be scheduled and executed by intelligent computing. The scheduling of execution is generated by using genetic algorithm method. It will improve traditional scheduling of exercise prescription for physical fitness and healthcare. Finally, we will demonstrate the advantages of the intelligent scheduling of execution for customized physical fitness and healthcare system.

  20. Reusable rocket engine preventive maintenance scheduling using genetic algorithm

    International Nuclear Information System (INIS)

    Chen, Tao; Li, Jiawen; Jin, Ping; Cai, Guobiao

    2013-01-01

    This paper deals with the preventive maintenance (PM) scheduling problem of reusable rocket engine (RRE), which is different from the ordinary repairable systems, by genetic algorithm. Three types of PM activities for RRE are considered and modeled by introducing the concept of effective age. The impacts of PM on all subsystems' aging processes are evaluated based on improvement factor model. Then the reliability of engine is formulated by considering the accumulated time effect. After that, optimization model subjected to reliability constraint is developed for RRE PM scheduling at fixed interval. The optimal PM combination is obtained by minimizing the total cost in the whole life cycle for a supposed engine. Numerical investigations indicate that the subsystem's intrinsic reliability characteristic and the improvement factor of maintain operations are the most important parameters in RRE's PM scheduling management

  1. Sleep/wake scheduling scheme for minimizing end-to-end delay in multi-hop wireless sensor networks

    OpenAIRE

    Madani Sajjad; Nazir Babar; Hasbullah Halabi

    2011-01-01

    Abstract We present a sleep/wake schedule protocol for minimizing end-to-end delay for event driven multi-hop wireless sensor networks. In contrast to generic sleep/wake scheduling schemes, our proposed algorithm performs scheduling that is dependent on traffic loads. Nodes adapt their sleep/wake schedule based on traffic loads in response to three important factors, (a) the distance of the node from the sink node, (b) the importance of the node's location from connectivity's perspective, and...

  2. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  3. The Growing Diversity of Work Schedules.

    Science.gov (United States)

    Smith, Shirley J.

    1986-01-01

    The author highlights the predominance of the five-day, 40-hour workweek. Although finding little change in recent years in the proportion of workers on 40-hour schedules, Smith notes that there have been some changes in work patterns, with a still small but growing group of workers on "compressed" full-time weeks of less than five days.…

  4. Preemptive scheduling in overloaded systems

    Czech Academy of Sciences Publication Activity Database

    Chrobak, M.; Epstein, L.; Noga, J.; Sgall, Jiří; van Stee, R.; Tichý, Tomáš; Vakhania, N.

    2003-01-01

    Roč. 67, č. 1 (2003), s. 183-197 ISSN 0022-0000 R&D Projects: GA ČR GA201/01/1195; GA MŠk ME 476; GA AV ČR IAA1019901; GA MŠk LN00A056 Institutional research plan: CEZ:AV0Z1019905; CEZ:AV0Z1019905 Keywords : scheduling * online algorithms * benefit Subject RIV: BA - General Mathematics Impact factor: 0.795, year: 2003

  5. Optimizing music learning: Exploring how blocked and interleaved practice schedules affect advanced performance

    Directory of Open Access Journals (Sweden)

    Christine E Carter

    2016-08-01

    Full Text Available Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the contextual interference effect. While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (twelve minutes per piece and a second concerto exposition and technical excerpt to practice in an interleaved schedule (three minutes per piece, alternating until a total of twelve minutes of practice were completed on each piece. Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated

  6. Advanced Planning and Scheduling Initiative- MrSpock Aims for Xmas

    Science.gov (United States)

    Steel, R.; Niezette, M.; Cesta, A.; Fratini, S.; Oddi, A.; Cortellessa, G.; Rasconi, R.; Verfaillie, G.; Pralet, C.; Lavagna, M.; Brambilla, A.; Castellini, F.; Donati, A.; Policella, N.

    2009-09-01

    This paper will outline the framework and tools developed under the Advanced Planning and Schedule Initiative (APSI) study performed by VEGA for the European Space Agency in collaboration with three academic institutions, ISTC-CNR, ONERA, and Politecnico di Milano. We will start by illustrating the background history to APSI and why it was needed, giving a brief summary of all the partners within the project and the roles they played within it. We will then take a closer look at what the APSI study actually consisted of, showing the techniques that were used and illustrating the framework that was developed within the scope of the project. This will be followed by an elaboration on the three demonstration test scenarios that have been developed as part of the project to validated the framework and demonstrate in an operational environment its applicability, illustrating the re-use and synergies between the three cases along the way. We will finally conclude with a brief summary and outline future directions to be further investigated and expanded on within the context of the work performed within the project.

  7. Sustainable Sport Scheduling Approach Considering Team Equity for the Korean Professional Baseball League

    Directory of Open Access Journals (Sweden)

    Young Dae Ko

    2018-02-01

    Full Text Available Since the Korea Baseball League (KBL had nine teams, an odd number, in the 2013 season, one team was unable to compete at certain times in the rotation while the other eight teams played games. Therefore, it was necessary to consider several elements to generate an annual match schedule in terms of team equity. However, the annual match schedule created by the conventional method could not fully reflect the elements regarding team equity, and there were a great many complaints from teams and fans. As a result, applying an optimization technique was decided upon to derive an efficient annual match schedule for the 2014 season. All the required conditions for scheduling are formulated as one or more equations and several parameter values concerning team equity are calculated with the related equations. Due to the complicated scheduling conditions, a sequential solution approach is applied by dividing the overall planning horizon in three parts. The derived annual match schedule was used for the 2014 season after some modifications, and the staff of the KBL was satisfied with the performance of the proposed scheduling methodology. Currently, this sustainable scheduling methodology is still in use to generate an efficient annual match schedule for the KBL.

  8. Nonstandard Work Schedules, Couple Desynchronization, and Parent-Child Interaction : A Mixed-Methods Analysis

    NARCIS (Netherlands)

    Taeht, Kadri; Mills, Melinda

    Many children live in households where either one or both parents work nonstandard schedules in the evening, night, or weekend. This study tests two competing hypotheses of whether nonstandard schedules result in lower levels of parent-child interaction or in more time with children. Using the first

  9. Amphetamine increases schedule-induced drinking reduced by negative punishment procedures.

    Science.gov (United States)

    Pérez-Padilla, Angeles; Pellón, Ricardo

    2003-05-01

    d-Amphetamine has been reported to increase schedule-induced drinking punished by lick-dependent signalled delays in food delivery. This might reflect a drug-behaviour interaction dependent on the type of punisher, because no such effect has been found when drinking was reduced by lick-contingent electric shocks. However, the anti-punishment effect of amphetamine could be mediated by other behavioural processes, such as a loss of discriminative control or an increase in the value of delayed reinforcers. To test the effects of d-amphetamine on the acquisition and maintenance of schedule-induced drinking reduced by unsignalled delays in food delivery. Rats received 10-s unsignalled delays initiated by each lick after polydipsia was induced by a fixed-time 30-s food reinforcement schedule or from the outset of the experiment. Yoked-control rats received these same delays but independently of their own behaviour. d-Amphetamine (0.1-3.0 mg/kg) was then tested IP. d-Amphetamine dose-dependently increased and then decreased punished schedule-induced drinking. The drug led to dose-dependent reductions when the delays were not contingent or when they were applied from the outset of training. These results support the contention that d-amphetamine has an increasing effect on schedule-induced drinking that has been previously reduced by a negative punishment procedure. This effect cannot be attributed to other potentially involved processes, and therefore support the idea that drug effects on punished behaviour depend on punishment being delays in food or shock deliveries.

  10. Hybrid Metaheuristics for Solving a Fuzzy Single Batch-Processing Machine Scheduling Problem

    Directory of Open Access Journals (Sweden)

    S. Molla-Alizadeh-Zavardehi

    2014-01-01

    Full Text Available This paper deals with a problem of minimizing total weighted tardiness of jobs in a real-world single batch-processing machine (SBPM scheduling in the presence of fuzzy due date. In this paper, first a fuzzy mixed integer linear programming model is developed. Then, due to the complexity of the problem, which is NP-hard, we design two hybrid metaheuristics called GA-VNS and VNS-SA applying the advantages of genetic algorithm (GA, variable neighborhood search (VNS, and simulated annealing (SA frameworks. Besides, we propose three fuzzy earliest due date heuristics to solve the given problem. Through computational experiments with several random test problems, a robust calibration is applied on the parameters. Finally, computational results on different-scale test problems are presented to compare the proposed algorithms.

  11. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  12. Ombuds’ corner: The first three years

    CERN Multimedia

    Vincent Vuillemin

    2013-01-01

    On average over the past three years, 3% of CERN staff members have used the Ombuds’ services each year. This is a reasonable figure as no institution can live without conflict. Too many cases would be worrying, as would too few: it would mean that conflicts are swept under the carpet. The question is not really how many conflicts arise, but how many can be and are resolved. Any conflict has a positive side: the opportunity to overcome it. Once a conflict or a misunderstanding has been resolved, the relationship generally ends up stronger as the obstacles have been removed.   As far as the issues brought to the Ombuds are concerned, a very similar picture has emerged each year. The relationships between supervisees and supervisors dominate the statistics. This may be due to the fact that people who are competent in their field are promoted to supervisory positions because they possess the technical skills but without having any in-depth training in managing people, and not everyone ...

  13. Nonlinear observer output-feedback MPC treatment scheduling for HIV

    Directory of Open Access Journals (Sweden)

    Zurakowski Ryan

    2011-05-01

    Full Text Available Abstract Background Mathematical models of the immune response to the Human Immunodeficiency Virus demonstrate the potential for dynamic schedules of Highly Active Anti-Retroviral Therapy to enhance Cytotoxic Lymphocyte-mediated control of HIV infection. Methods In previous work we have developed a model predictive control (MPC based method for determining optimal treatment interruption schedules for this purpose. In this paper, we introduce a nonlinear observer for the HIV-immune response system and an integrated output-feedback MPC approach for implementing the treatment interruption scheduling algorithm using the easily available viral load measurements. We use Monte-Carlo approaches to test robustness of the algorithm. Results The nonlinear observer shows robust state tracking while preserving state positivity both for continuous and discrete measurements. The integrated output-feedback MPC algorithm stabilizes the desired steady-state. Monte-Carlo testing shows significant robustness to modeling error, with 90% success rates in stabilizing the desired steady-state with 15% variance from nominal on all model parameters. Conclusions The possibility of enhancing immune responsiveness to HIV through dynamic scheduling of treatment is exciting. Output-feedback Model Predictive Control is uniquely well-suited to solutions of these types of problems. The unique constraints of state positivity and very slow sampling are addressable by using a special-purpose nonlinear state estimator, as described in this paper. This shows the possibility of using output-feedback MPC-based algorithms for this purpose.

  14. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  15. Development of the social brain from age three to twelve years.

    Science.gov (United States)

    Richardson, Hilary; Lisandrelli, Grace; Riobueno-Naylor, Alexa; Saxe, Rebecca

    2018-03-12

    Human adults recruit distinct networks of brain regions to think about the bodies and minds of others. This study characterizes the development of these networks, and tests for relationships between neural development and behavioral changes in reasoning about others' minds ('theory of mind', ToM). A large sample of children (n = 122, 3-12 years), and adults (n = 33), watched a short movie while undergoing fMRI. The movie highlights the characters' bodily sensations (often pain) and mental states (beliefs, desires, emotions), and is a feasible experiment for young children. Here we report three main findings: (1) ToM and pain networks are functionally distinct by age 3 years, (2) functional specialization increases throughout childhood, and (3) functional maturity of each network is related to increasingly anti-correlated responses between the networks. Furthermore, the most studied milestone in ToM development, passing explicit false-belief tasks, does not correspond to discontinuities in the development of the social brain.

  16. Energy-efficient TDMA medium access control protocol scheduling

    NARCIS (Netherlands)

    Havinga, Paul J.M.; Smit, Gerard J.M.

    2000-01-01

    In this paper we study the energy efficiency and channel efficiency of TDMA MAC protocol scheduling mechanisms. Most MAC protocols are based on phase grouping that basically has three phases in a frame: uplink, downlink and reservation. We propose a new mechanism in which we have multiple uplink and

  17. [Computerized ranking test in three French universities: Staff experience and students' feedback].

    Science.gov (United States)

    Roux, D; Meyer, G; Cymbalista, F; Bouaziz, J-D; Falgarone, G; Tesniere, A; Gervais, J; Cariou, A; Peffault de Latour, R; Marat, M; Moenaert, E; Guebli, T; Rodriguez, O; Lefort, A; Dreyfuss, D; Hajage, D; Ricard, J-D

    2016-03-01

    The year 2016 will be pivotal for the evaluation of French medical students with the introduction of the first computerized National Ranking Test (ECNi). The SIDES, online electronic system for medical student evaluation, was created for this purpose. All the universities have already organized faculty exams but few a joint computerized ranking test at several universities simultaneously. We report our experience on the organization of a mock ECNi by universities Paris Descartes, Paris Diderot and Paris 13. Docimological, administrative and technical working groups were created to organize this ECNi. Students in their fifth year of medical studies, who will be the first students to sit for the official ECNi in 2016, were invited to attend this mock exam that represented more than 50% of what will be proposed in 2016. A final electronic questionnaire allowed a docimological and organizational evaluation by students. An analysis of ratings and rankings and their distribution on a 1000-point scale were performed. Sixty-four percent of enrolled students (i.e., 654) attended the three half-day exams. No difference in total score and ranking between the three universities was observed. Students' feedback was extremely positive. Normalized over 1000 points, 99% of students were scored on 300 points only. Progressive clinical cases were the most discriminating test. The organization of a mock ECNi involving multiple universities was a docimological and technical success but required an important administrative, technical and teaching investment. Copyright © 2016 Société nationale française de médecine interne (SNFMI). Published by Elsevier SAS. All rights reserved.

  18. Robust Optimization-Based Generation Self-Scheduling under Uncertain Price

    Directory of Open Access Journals (Sweden)

    Xiao Luo

    2011-01-01

    Full Text Available This paper considers generation self-scheduling in electricity markets under uncertain price. Based on the robust optimization (denoted as RO methodology, a new self-scheduling model, which has a complicated max-min optimization structure, is set up. By using optimal dual theory, the proposed model is reformulated to an ordinary quadratic and quadratic cone programming problems in the cases of box and ellipsoidal uncertainty, respectively. IEEE 30-bus system is used to test the new model. Some comparisons with other methods are done, and the sensitivity with respect to the uncertain set is analyzed. Comparing with the existed uncertain self-scheduling approaches, the new method has twofold characteristics. First, it does not need a prediction of distribution of random variables and just requires an estimated value and the uncertain set of power price. Second, the counterpart of RO corresponding to the self-scheduling is a simple quadratic or quadratic cone programming. This indicates that the reformulated problem can be solved by many ordinary optimization algorithms.

  19. Spillways Scheduling for Flood Control of Three Gorges Reservoir Using Mixed Integer Linear Programming Model

    Directory of Open Access Journals (Sweden)

    Maoyuan Feng

    2014-01-01

    Full Text Available This study proposes a mixed integer linear programming (MILP model to optimize the spillways scheduling for reservoir flood control. Unlike the conventional reservoir operation model, the proposed MILP model specifies the spillways status (including the number of spillways to be open and the degree of the spillway opened instead of reservoir release, since the release is actually controlled by using the spillway. The piecewise linear approximation is used to formulate the relationship between the reservoir storage and water release for a spillway, which should be open/closed with a status depicted by a binary variable. The control order and symmetry rules of spillways are described and incorporated into the constraints for meeting the practical demand. Thus, a MILP model is set up to minimize the maximum reservoir storage. The General Algebraic Modeling System (GAMS and IBM ILOG CPLEX Optimization Studio (CPLEX software are used to find the optimal solution for the proposed MILP model. The China’s Three Gorges Reservoir, whose spillways are of five types with the total number of 80, is selected as the case study. It is shown that the proposed model decreases the flood risk compared with the conventional operation and makes the operation more practical by specifying the spillways status directly.

  20. Influences on cocaine tolerance assessed under a multiple conjunctive schedule of reinforcement.

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N

    2009-11-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the effects of cocaine on key-pecking responses of White Carneau pigeons maintained under a three-component multiple conjunctive FI (10 s, 30 s, & 120 s) FR (5 responses) schedule of food presentation. Dose-effect curves representing the effects of presession cocaine on responding were assessed in the context of (1) acute administration of cocaine (2) chronic administration of cocaine and (3) daily administration of saline. Chronic administration of cocaine generally resulted in tolerance to the response-rate decreasing effects of cocaine, and that tolerance was generally independent of relative FI value, as measured by changes in ED50 values. Daily administration of saline decreased ED50 values to those observed when cocaine was administered acutely. The results show that adding a FR requirement to FI schedules is not sufficient to produce schedule-parameter-specific tolerance. Tolerance to cocaine was generally independent of FI-parameter under the present conjunctive schedules, indicating that a ratio requirement, per se, is not sufficient for tolerance to be dependent on FI parameter.

  1. Comparison of three commercial fecal calprotectin ELISA test kits used in patients with Inflammatory Bowel Disease

    DEFF Research Database (Denmark)

    Mirsepasi-Lauridsen, Hengameh Chloé; Bachmann Holmetoft, Ulla; Halkjær, Sofie Ingdam

    2016-01-01

    OBJECTIVE: Fecal calprotectin is a noninvasive marker of intestinal inflammation used to distinguish between functional and organic bowel diseases and to evaluate disease activity among patients with Inflammatory Bowel Disease (IBD). The goal of this study was to compare three different ELISA tests...... and 18 to 67 years, respectively. Disease activity in the patients was established using the following clinical activity indices: the Simple Clinical Colitis Activity Index (SCCAI), the Harvey Bradshaw Index (HBI) and the Modified Pouchitis Disease Activity Index (MPDAI). Three ELISA calprotectin tests...... (EK-CAL, CALPRO and HK325) were performed on fecal specimens and results compared. RESULTS: The CALPRO calprotectin ELISA test was shown to have the best specificity of 96% compared to the HK325 and the EK-CAL calprotectin ELISA tests with 28% specificity and 74% specificity, respectively...

  2. Schedules of controlled substances: extension of temporary placement of UR-144, XLR11, and AKB48 in schedule I of the Controlled Substances Act. Final order.

    Science.gov (United States)

    2015-05-15

    The Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to extend the temporary placement of (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48), including their salts, isomers, and salts of isomers whenever the existence of such salts, isomers, and salts of isomers is possible, in schedule I of the Controlled Substances Act. The current final order temporarily placing UR-144, XLR11, and AKB48 in schedule I is due to expire on May 15, 2015. This final order will extend the temporary scheduling of UR-144, XLR11, and AKB48 to May 15, 2016, or until the permanent scheduling action for these three substances is completed, whichever occurs first.

  3. Compliance with the vaccination schedule in children hospitalized with pneumonia and associated factors

    Science.gov (United States)

    da Silva, Amanda Tabosa Pereira; Lima, Eduardo Jorge da Fonseca; Caminha, Maria de Fátima Costa; da Silva, Andresa Tabosa Pereira; Rodrigues, Edil de Albuquerque; dos Santos, Carmina Silva

    2018-01-01

    ABSTRACT OBJECTIVE: To verify the adequacy and factors associated with compliance with the immunization schedule (BCG, DTP-Hib, MMR, PCV-10) in children hospitalized with pneumonia at a pediatric referral hospital in Northeast Brazil. METHODS: This is a cross-sectional, descriptive study with an analytical component, with a sample of 452 children hospitalized with pneumonia at the Instituto de Medicina Integral Prof. Fernando Figueira, between 2010 and 2013. The inclusion criterion was children aged from one month to less than five years of age with proof in the immunization record. The exclusion criterion was the presence of hospital-acquired pneumonia or concomitant disease. We have evaluated the adequacy of the immunization schedule for the BCG, tetravalent, MMR, and 10-valent pneumococcal conjugate (PCV-10) vaccines. We used the chi-square test and Fisher's exact test followed by multivariate Poisson regression, estimating the crude and adjusted prevalence ratios and respective 95% confidence intervals. The variables with p < 0.20 in the univariate analysis were included in the multivariate analysis. RESULTS: There was good adequacy in the immunization schedule, except for PCV-10, which presented a percentage lower than 85%. We have observed an association between adequate compliance with the immunization schedule and education level of the mother (89.9% complete high school), sex of the child (87.2% female), age of the child (94.2% younger than six months), and breastfeeding (84.3% breastfed). CONCLUSIONS: Given the high rate of education level of the mother and the high percentage of breastfeeding, we can understand that there is a better understanding of the health of the child by the mothers studied in this study, showing the effectiveness of public policies for infant feeding. However, children did not have good adequacy of the immunization schedule of PCV-10, one of the main vaccines against pneumonia, which can be one of the main factors in the causes of

  4. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  5. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  6. MMS trims proposed schedule for OCS oil and gas lease sales

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that the U.S. Interior Department has proposed only 18 Outer Continental Shelf oil and gas lease sales in its new 5 year schedule. Eleven of the sales are in the Gulf of Mexico, one off the east Coast, none off the West Coast, and six off Alaska. Congress has 60 days in which to reject the 5 year lease sale plan but is not expected to. An earlier draft plan called for 23 sales. The Minerals Management Service, which administers the offshore leasing program, the the new schedule emphasizes leasing of gas prone areas

  7. Individual differences in strategic flight management and scheduling

    Science.gov (United States)

    Wickens, Christopher D.; Raby, Mireille

    1991-01-01

    A group of 30 instrument-rated pilots was made to fly simulator approaches to three airports under conditions of low, medium, and high workload conditions. An analysis is presently conducted of the difference in discrete task scheduling between the group of 10 highest and 10 lowest performing pilots in the sample; this categorization was based on the mean of various flight-profile measures. The two groups were found to differ from each other only in terms of the time when specific events were conducted, and of the optimality of scheduling for certain high-priority tasks. These results are assessed in view of the relative independence of task-management skills from aircraft-control skills.

  8. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  9. Homework schedule: an important factor associated with shorter sleep duration among Chinese school-aged children.

    Science.gov (United States)

    Li, Shenghui; Yang, Qian; Chen, Zhe; Jin, Xingming; Jiang, Fan; Shen, Xiaoming

    2014-09-03

    This study was designed to examine the hypothesis that homework schedule has adverse impacts on Chinese children's sleep-wake habits and sleep duration. A random sample of 19,299 children aged 5.08 to 11.99 years old participated in a large, cross-sectional survey. A parent-administered questionnaire was completed to quantify children's homework schedule and sleep behaviors. Generally, it was demonstrated that more homework schedule was significantly associated with later bedtime, later wake time, and shorter sleep duration. Among all sleep variables, bedtime and sleep duration during weekdays appeared to be most affected by homework schedule, especially homework schedule during weekdays.

  10. Collaborative Distributed Scheduling Approaches for Wireless Sensor Network

    Science.gov (United States)

    Niu, Jianjun; Deng, Zhidong

    2009-01-01

    Energy constraints restrict the lifetime of wireless sensor networks (WSNs) with battery-powered nodes, which poses great challenges for their large scale application. In this paper, we propose a family of collaborative distributed scheduling approaches (CDSAs) based on the Markov process to reduce the energy consumption of a WSN. The family of CDSAs comprises of two approaches: a one-step collaborative distributed approach and a two-step collaborative distributed approach. The approaches enable nodes to learn the behavior information of its environment collaboratively and integrate sleep scheduling with transmission scheduling to reduce the energy consumption. We analyze the adaptability and practicality features of the CDSAs. The simulation results show that the two proposed approaches can effectively reduce nodes' energy consumption. Some other characteristics of the CDSAs like buffer occupation and packet delay are also analyzed in this paper. We evaluate CDSAs extensively on a 15-node WSN testbed. The test results show that the CDSAs conserve the energy effectively and are feasible for real WSNs. PMID:22408491

  11. Sort-Mid tasks scheduling algorithm in grid computing.

    Science.gov (United States)

    Reda, Naglaa M; Tawfik, A; Marzok, Mohamed A; Khamis, Soheir M

    2015-11-01

    Scheduling tasks on heterogeneous resources distributed over a grid computing system is an NP-complete problem. The main aim for several researchers is to develop variant scheduling algorithms for achieving optimality, and they have shown a good performance for tasks scheduling regarding resources selection. However, using of the full power of resources is still a challenge. In this paper, a new heuristic algorithm called Sort-Mid is proposed. It aims to maximizing the utilization and minimizing the makespan. The new strategy of Sort-Mid algorithm is to find appropriate resources. The base step is to get the average value via sorting list of completion time of each task. Then, the maximum average is obtained. Finally, the task has the maximum average is allocated to the machine that has the minimum completion time. The allocated task is deleted and then, these steps are repeated until all tasks are allocated. Experimental tests show that the proposed algorithm outperforms almost other algorithms in terms of resources utilization and makespan.

  12. Multi-objective scheduling of electric vehicles in smart distribution system

    International Nuclear Information System (INIS)

    Zakariazadeh, Alireza; Jadid, Shahram; Siano, Pierluigi

    2014-01-01

    Highlights: • Environmental/economic operational scheduling of electric vehicles. • The Vehicle to Grid capability and the actual patterns of drivers are considered. • A novel conceptual model for an electric vehicle management system is proposed. - Abstract: When preparing for the widespread adoption of Electric Vehicles (EVs), an important issue is to use a proper EVs’ charging/discharging scheduling model that is able to simultaneously consider economic and environmental goals as well as technical constraints of distribution networks. This paper proposes a multi-objective operational scheduling method for charging/discharging of EVs in a smart distribution system. The proposed multi-objective framework, based on augmented ε-constraint method, aims at minimizing the total operational costs and emissions. The Vehicle to Grid (V2G) capability as well as the actual patterns of drivers are considered in order to generate the Pareto-optimal solutions. The Benders decomposition technique is used in order to solve the proposed optimization model and to convert the large scale mixed integer nonlinear problem into mixed-integer linear programming and nonlinear programming problems. The effectiveness of the proposed resources scheduling approach is tested on a 33-bus distribution test system over a 24-h period. The results show that the proposed EVs’ charging/discharging method can reduce both of operation cost and air pollutant emissions

  13. A model of alcohol drinking under an intermittent access schedule using group-housed mice.

    Directory of Open Access Journals (Sweden)

    Magdalena Smutek

    Full Text Available Here, we describe a new model of voluntary alcohol drinking by group-housed mice. The model employs sensor-equipped cages that track the behaviors of the individual animals via implanted radio chips. After the animals were allowed intermittent access to alcohol (three 24 h intervals every week for 4 weeks, the proportions of licks directed toward bottles containing alcohol were 50.9% and 39.6% for the male and female mice, respectively. We used three approaches (i.e., quinine adulteration, a progressive ratio schedule and a schedule involving a risk of punishment to test for symptoms of compulsive alcohol drinking. The addition of 0.01% quinine to the alcohol solution did not significantly affect intake, but 0.03% quinine induced a greater than 5-fold reduction in the number of licks on the alcohol bottles. When the animals were required to perform increasing numbers of instrumental responses to obtain access to the bottle with alcohol (i.e., a progressive ratio schedule, they frequently reached a maximum of 21 responses irrespective of the available reward. Although the mice rarely achieved higher response criteria, the number of attempts was ∼ 10 times greater in case of alcohol than water. We have developed an approach for mapping social interactions among animals that is based on analysis of the sequences of entries into the cage corners. This approach allowed us to identify the mice that followed other animals in non-random fashions. Approximately half of the mice displayed at least one interaction of this type. We have not yet found a clear correlation between imitative behavior and relative alcohol preference. In conclusion, the model we describe avoids the limitations associated with testing isolated animals and reliably leads to stable alcohol drinking. Therefore, this model may be well suited to screening for the effects of genetic mutations or pharmacological treatments on alcohol-induced behaviors.

  14. Production planning and scheduling in refinery industry

    International Nuclear Information System (INIS)

    Persson, Jan.

    1999-01-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  15. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-07-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis.

  16. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-06-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  17. SYSTEMATIC LITERATURE REVIEW ON RESOURCE ALLOCATION AND RESOURCE SCHEDULING IN CLOUD COMPUTING

    OpenAIRE

    B. Muni Lavanya; C. Shoba Bindu

    2016-01-01

    The objective the work is intended to highlight the key features and afford finest future directions in the research community of Resource Allocation, Resource Scheduling and Resource management from 2009 to 2016. Exemplifying how research on Resource Allocation, Resource Scheduling and Resource management has progressively increased in the past decade by inspecting articles, papers from scientific and standard publications. Survey materialized in three-fold process. Firstly, investigate on t...

  18. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  19. Scheduling Broadcasts in a Network of Timelines

    KAUST Repository

    Manzoor, Emaad A.

    2015-05-12

    Broadcasts and timelines are the primary mechanism of information exchange in online social platforms today. Services like Facebook, Twitter and Instagram have enabled ordinary people to reach large audiences spanning cultures and countries, while their massive popularity has created increasingly competitive marketplaces of attention. Timing broadcasts to capture the attention of such geographically diverse audiences has sparked interest from many startups and social marketing gurus. However, formal study is lacking on both the timing and frequency problems. In this thesis, we introduce, motivate and solve the broadcast scheduling problem of specifying the timing and frequency of publishing content to maximise the attention received. We validate and quantify three interacting behavioural phenomena to parametrise social platform users: information overload, bursty circadian rhythms and monotony aversion, which is defined here for the first time. Our analysis of the influence of monotony refutes the common assumption that posts on social network timelines are consumed piecemeal independently. Instead, we reveal that posts are consumed in chunks, which has important consequences for any future work considering human behaviour over social network timelines. Our quantification of monotony aversion is also novel, and has applications to problems in various domains such as recommender list diversification, user satiation and variety-seeking consumer behaviour. Having studied the underlying behavioural phenomena, we link schedules, timelines, attention and behaviour by formalising a timeline information exchange process. Our formulation gives rise to a natural objective function that quantifies the expected collective attention an arrangement of posts on a timeline will receive. We apply this formulation as a case-study on real-data from Twitter, where we estimate behavioural parameters, calculate the attention potential for different scheduling strategies and, using the

  20. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  1. Schedules of Controlled Substances: Temporary Placement of ortho-Fluorofentanyl, Tetrahydrofuranyl Fentanyl, and Methoxyacetyl Fentanyl Into Schedule I. Temporary amendment; temporary scheduling order.

    Science.gov (United States)

    2017-10-26

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioids, N-(2-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)propionamide (ortho-fluorofentanyl or 2-fluorofentanyl), N-(1-phenethylpiperidin-4-yl)-N-phenyltetrahydrofuran-2-carboxamide (tetrahydrofuranyl fentanyl), and 2-methoxy-N-(1-phenethylpiperidin-4-yl)-N-phenylacetamide (methoxyacetyl fentanyl), into Schedule I. This action is based on a finding by the Administrator that the placement of ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl into Schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to Schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl.

  2. Verification of reliability and validity of a Japanese version of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Suzuki, Eiko; Kanoya, Yuka; Katsuki, Takeshi; Sato, Chifumi

    2007-07-01

    To verify the reliability and validity of a Japanese version of the Rathus Assertiveness Schedule in novice nurses to contribute to nursing management. An adequate scale is needed to measure the assertiveness and the effect of assertion training for Japanese nurses and to compare them with those in other countries. Rathus Assertiveness Schedule was adapted to Japanese with back-translation and its validity was examined in 989 novice nurses. The Japanese version showed a high coefficient of reliability in a split-half reliability test (r=0.76; PAssertiveness Schedule. The Japanese version of Rathus Assertiveness Schedule was verified.

  3. Screenings of lung cancer with low dose spiral CT: results of a three year pilot study and design of the randomised controlled trial Italung-CT

    International Nuclear Information System (INIS)

    Picozzi, Giulia; Paci, Enrico; Lopes Pegna, Andrea

    2005-01-01

    Purpose: To report the results of a three-year observational pilot study of lung cancer screening with low dose computed tomography (CT) and to present the study design of a randomised clinical trial named as Italung CT. Materials and methods: Sixty (47 males and 13 females, mean age 64±4.5 years) heavy smokers (at least 20 packs-year) underwent three low-dose spiral CT screening tests one year apart on a single slice or multislice CT scanner. Indeterminate nodules were managed according to the recommendations of the Early Lung Cancer Action Project. Results: Indeterminate nodules were observed in 33 (55%) of the subjects (60% at the baseline screening test, 24% at the first annual test and 16% at the second annual test). The size of the largest indeterminate nodule was [it

  4. Cask development, testing, and licensing

    International Nuclear Information System (INIS)

    Quinn, G.J.; Haelsig, R.T.; Warrant, M.M.

    1986-01-01

    The NuPac 125-B Rail Cask was developed to provide a safe means of transporting the damaged core of Three Mile Island Unit 2 from the TMI site at Middletown, PA, to the Idaho National Engineering laboratory (INEL) at Idaho Falls, ID. The development of the NuPac 125-B Rail Cask posed two engineering and technical management challenges; Licensing Strategy - The NuPac 125-B Rail Cask represented the first irradiated fuel rail cask developed within the United States in the past decade, a decade characterized by changing nuclear regulations, and Accelerated Schedule - The TMI-2 defueling schedule demanded a cask development schedule one-third as long as normally required. These challenges governed the overall development and licensing process for the cask. First, a high degree of conservation was incorporated into the design to allow quick, simplified demonstrations of adequacy to regulatory staff. Second, redundant design techniques were employed in all areas of uncertainty. The testing program eliminated performance uncertainties and validated predictions and predictive models. Drop tests of a quarter-scale model of the cask were conducted, and results were correlated with analytic predictions to verify structural and mechanical performance of the cask. Full-scale tests of the canisters were conducted to verify structural behavior of canister internals which provide criticality control. This paper describes the testing program for the NuPac 125-B Rail Cask, presents results therefrom, and correlates findings with Regulation 10 CFR 71 of the U.S. Nuclear Regulatory Commission

  5. Scheduling results applicable to decision-theoretic troubleshooting

    Czech Academy of Sciences Publication Activity Database

    Lín, Václav

    2015-01-01

    Roč. 57, č. 1 (2015), s. 87-107 ISSN 0888-613X R&D Projects: GA ČR GA13-20012S Institutional support: RVO:67985556 Keywords : Decision-theoretic troubleshooting * Single machine scheduling with weighted flowtime * Algorithms * Computational complexity Subject RIV: BB - Applied Statistics, Operational Research Impact factor: 2.696, year: 2015

  6. Uncertainty management by relaxation of conflicting constraints in production process scheduling

    Science.gov (United States)

    Dorn, Juergen; Slany, Wolfgang; Stary, Christian

    1992-01-01

    Mathematical-analytical methods as used in Operations Research approaches are often insufficient for scheduling problems. This is due to three reasons: the combinatorial complexity of the search space, conflicting objectives for production optimization, and the uncertainty in the production process. Knowledge-based techniques, especially approximate reasoning and constraint relaxation, are promising ways to overcome these problems. A case study from an industrial CIM environment, namely high-grade steel production, is presented to demonstrate how knowledge-based scheduling with the desired capabilities could work. By using fuzzy set theory, the applied knowledge representation technique covers the uncertainty inherent in the problem domain. Based on this knowledge representation, a classification of jobs according to their importance is defined which is then used for the straightforward generation of a schedule. A control strategy which comprises organizational, spatial, temporal, and chemical constraints is introduced. The strategy supports the dynamic relaxation of conflicting constraints in order to improve tentative schedules.

  7. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  8. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  9. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  10. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  11. Microstructural evolution in dual-ion irradiated 316SS under various helium injection schedules

    International Nuclear Information System (INIS)

    Kohyama, A.; Igata, N.; Ayrault, G.; Tokyo Univ.

    1984-01-01

    Dual-ion irradiated 316 SS samples with various helium injection schedules were studied. The intent of using different schedules was to either approximate the MFR condition, mimic the mixed spectrum reactor condition or mimic the fast reactor condition. The objective of this investigation is to study the influence of these different helium injection schedules on the microstructural development under irradiation. The materials for this study was 316 SS (MFE heat) with three thermomechanical pre-irradiation treatments: solution annealed, solution annealed and aged and 20% cold worked. The cavity nucleation and growth stages were investigated using high resolution TEM. (orig.)

  12. Irrigation scheduling research: South African experiences and future ...

    African Journals Online (AJOL)

    This paper was originally presented at the Water Research. Commission 40-Year .... direct link with dry matter production (Tanner and Sinclair,. 1983). Scheduling ..... type infrared thermometer for measuring canopy temperature received much ..... subscribers and advice was made available through web down- loads for ...

  13. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  14. The influence of the operating schedule of the Greek Research Reactor on the radiological consequences of the reactor

    International Nuclear Information System (INIS)

    Kollas, J.G.

    1986-04-01

    The sensitivity of the radiological consequences of the Greek Research Reactor to the operating schedule of the reactor is assessed in this report. The consequences are due to the occurrence of a postulated accident, a 20% core melt loss of coolant accident. Three different operating schedules are considered: (a) the present 8 hrs/day, 5 days/wk schedule, (b) a 16 hrs/day, 5 days/wk schedule, and (c) a continuous operation schedule. The results of the analysis indicate that there is a direct relation between consequences and duration of operation. (author)

  15. JOB SHOP SCHEDULING BIOBJETIVO MEDIANTE ENFRIAMIENTO SIMULADO Y ENFOQUE DE PARETO JOB-SHOP SCHEDULING: BIO-OBJECTIVE THROUGH SIMULATED COOLING AND PARETO PRINCIPLE

    Directory of Open Access Journals (Sweden)

    Juan Carlos Osorio

    2012-12-01

    Full Text Available El problema del scheduling es uno de los problemas más ampliamente tratados en la literatura; sin embargo, es un problema complejo NP hard. Cuando, además, se involucra más de un objetivo, este problema se convierte en uno de los más complejos en el campo de la investigación de operaciones. Se presenta entonces un modelo biobjetivo para el job shop scheduling que incluye el makespan y el tiempo de flujo medio. Para resolver el modelo se ha utilizado una propuesta que incluye el uso del meta-heurístico Recocido Simulado (SA y el enfoque de Pareto. Este modelo es evaluado en tres problemas presentados en la literatura de tamaños 6x6, 10x5 y 10x10. Los resultados del modelo se comparan con otros meta-heurísticos y se encuentra que este modelo presenta buenos resultados en los tres problemas evaluados.The scheduling problem is one of the most widely treated problems in literature; however, it is an NP hard complex problem. Also, when more than one objective is involved, this problem becomes one of the most complex ones in the field of operations research. A bio-objective model is then emerged for the Job-Shop Scheduling, including makespan and mean flow time. For solving the model a proposal which includes the use of Simulated Annealing (SA metaheuristic and Pareto Principle. This model is evaluated in three problems described in literature with the following sizes: 6x6, 10x5 and 10x10. Results of the model are compared to other metaheuristics and it has been found that this model shows good results in the three problems evaluated.

  16. Designing a prototype of the ITER pulse scheduling system

    International Nuclear Information System (INIS)

    Yamamoto, T.; Yonekawa, I.; Ohta, K.; Hosoyama, H.; Hashimoto, Y.; Wallander, A.; Winter, A.; Sugie, T.; Kusama, Y.; Kawano, Y.; Yoshino, R.

    2012-01-01

    Highlights: ► We designed a prototype of the ITER pulse scheduling system. ► Structure of ITER pulse schedules was designed. ► Validation and automatic value assignment functions were adopted. ► A prototype will be implemented in 2011. - Abstract: A prototype of the ITER pulse scheduling system that prepares and manages parameters for ITER plasma operations has been designed. Based on the analyzed requirements on the system, structure of the parameters and necessary functions were determined. Segment and module structures were tuned to the ITER requirements. Three types of validations assure sanity of the parameters. The design limits check and the operation window check verify whether the values of the parameters do not exceed the limits. The consistency check calculates dependency among parameters in accordance with logics described in a scripting language. The ITER pulse scheduling system provides interface with a physics model and simulator. Some abstract physics parameters are converted to engineering parameters with the physics simulation. The results of simulation such as plasma characteristics of specified parameters are also shown to the researchers. The tool to specify the parameters is data-driven. Therefore, it is flexible for changes of number of the parameters. A prototype is being implemented in 2011. Using the prototype, this design will be verified and refined. The evaluation of the prototype will be a basis of the final production of the ITER pulse scheduling system.

  17. Hybrid Pareto artificial bee colony algorithm for multi-objective single machine group scheduling problem with sequence-dependent setup times and learning effects.

    Science.gov (United States)

    Yue, Lei; Guan, Zailin; Saif, Ullah; Zhang, Fei; Wang, Hao

    2016-01-01

    Group scheduling is significant for efficient and cost effective production system. However, there exist setup times between the groups, which require to decrease it by sequencing groups in an efficient way. Current research is focused on a sequence dependent group scheduling problem with an aim to minimize the makespan in addition to minimize the total weighted tardiness simultaneously. In most of the production scheduling problems, the processing time of jobs is assumed as fixed. However, the actual processing time of jobs may be reduced due to "learning effect". The integration of sequence dependent group scheduling problem with learning effects has been rarely considered in literature. Therefore, current research considers a single machine group scheduling problem with sequence dependent setup times and learning effects simultaneously. A novel hybrid Pareto artificial bee colony algorithm (HPABC) with some steps of genetic algorithm is proposed for current problem to get Pareto solutions. Furthermore, five different sizes of test problems (small, small medium, medium, large medium, large) are tested using proposed HPABC. Taguchi method is used to tune the effective parameters of the proposed HPABC for each problem category. The performance of HPABC is compared with three famous multi objective optimization algorithms, improved strength Pareto evolutionary algorithm (SPEA2), non-dominated sorting genetic algorithm II (NSGAII) and particle swarm optimization algorithm (PSO). Results indicate that HPABC outperforms SPEA2, NSGAII and PSO and gives better Pareto optimal solutions in terms of diversity and quality for almost all the instances of the different sizes of problems.

  18. Measured airtightness of twenty-four detached houses over periods of up to three years

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    A three year field study of 20 energy efficient houses and four conventional dwellings was conducted in Winnipeg, Manitoba to evaluate the performance of their building envelope systems. Ten of the houses were built with polyethylene air barriers and 14 using the Airtight Drywall Approach (ADA). All were newly constructed and used dry wood for the framing members with a wood moisture content (WMC) below 19 percent. Building envelope performance was evaluated by developing a comprehensive monitoring program which included measurements of wall, attic, and floor joist WMC levels, detailed thermographic examinations and regular airtightness testing. Over 13,000 WMC measurements were performed, 1,013 thermographic images recorded, and 167 airtightness tests conducted.

  19. MIP Models and Hybrid Algorithms for Simultaneous Job Splitting and Scheduling on Unrelated Parallel Machines

    Science.gov (United States)

    Ozmutlu, H. Cenk

    2014-01-01

    We developed mixed integer programming (MIP) models and hybrid genetic-local search algorithms for the scheduling problem of unrelated parallel machines with job sequence and machine-dependent setup times and with job splitting property. The first contribution of this paper is to introduce novel algorithms which make splitting and scheduling simultaneously with variable number of subjobs. We proposed simple chromosome structure which is constituted by random key numbers in hybrid genetic-local search algorithm (GAspLA). Random key numbers are used frequently in genetic algorithms, but it creates additional difficulty when hybrid factors in local search are implemented. We developed algorithms that satisfy the adaptation of results of local search into the genetic algorithms with minimum relocation operation of genes' random key numbers. This is the second contribution of the paper. The third contribution of this paper is three developed new MIP models which are making splitting and scheduling simultaneously. The fourth contribution of this paper is implementation of the GAspLAMIP. This implementation let us verify the optimality of GAspLA for the studied combinations. The proposed methods are tested on a set of problems taken from the literature and the results validate the effectiveness of the proposed algorithms. PMID:24977204

  20. MIP models and hybrid algorithms for simultaneous job splitting and scheduling on unrelated parallel machines.

    Science.gov (United States)

    Eroglu, Duygu Yilmaz; Ozmutlu, H Cenk

    2014-01-01

    We developed mixed integer programming (MIP) models and hybrid genetic-local search algorithms for the scheduling problem of unrelated parallel machines with job sequence and machine-dependent setup times and with job splitting property. The first contribution of this paper is to introduce novel algorithms which make splitting and scheduling simultaneously with variable number of subjobs. We proposed simple chromosome structure which is constituted by random key numbers in hybrid genetic-local search algorithm (GAspLA). Random key numbers are used frequently in genetic algorithms, but it creates additional difficulty when hybrid factors in local search are implemented. We developed algorithms that satisfy the adaptation of results of local search into the genetic algorithms with minimum relocation operation of genes' random key numbers. This is the second contribution of the paper. The third contribution of this paper is three developed new MIP models which are making splitting and scheduling simultaneously. The fourth contribution of this paper is implementation of the GAspLAMIP. This implementation let us verify the optimality of GAspLA for the studied combinations. The proposed methods are tested on a set of problems taken from the literature and the results validate the effectiveness of the proposed algorithms.

  1. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  2. Nonstandard Work Schedules, Family Dynamics, and Mother-Child Interactions During Early Childhood.

    Science.gov (United States)

    Prickett, Kate C

    2018-03-01

    The rising number of parents who work nonstandard schedules has led to a growing body of research concerned with what this trend means for children. The negative outcomes for children of parents who work nonstandard schedules are thought to arise from the disruptions these schedules place on family life, and thus, the types of parenting that support their children's development, particularly when children are young. Using a nationally representative sample of two-parent families (Early Childhood Longitudinal Study-Birth cohort, n = 3,650), this study examined whether mothers' and their partners' nonstandard work schedules were associated with mothers' parenting when children were 2 and 4 years old. Structural equation models revealed that mothers' and their partners' nonstandard work schedules were associated with mothers' lower scores on measures of positive and involved parenting. These associations were mediated by fathers' lower levels of participation in cognitively supportive parenting and greater imbalance in cognitively supportive tasks conducted by mothers versus fathers.

  3. Multi-User Preemptive Scheduling For Critical Low Latency Communications in 5G Networks

    DEFF Research Database (Denmark)

    Abdul-Mawgood Ali Ali Esswie, Ali; Pedersen, Klaus

    2018-01-01

    5G new radio is envisioned to support three major service classes: enhanced mobile broadband (eMBB), ultrareliable low-latency communications (URLLC), and massive machine type communications. Emerging URLLC services require up to one millisecond of communication latency with 99.999% success...... probability. Though, there is a fundamental trade-off between system spectral efficiency (SE) and achievable latency. This calls for novel scheduling protocols which cross-optimize system performance on user-centric; instead of network-centric basis. In this paper, we develop a joint multi-user preemptive...... scheduling strategy to simultaneously cross-optimize system SE and URLLC latency. At each scheduling opportunity, available URLLC traffic is always given higher priority. When sporadic URLLC traffic appears during a transmission time interval (TTI), proposed scheduler seeks for fitting the URLLC-eMBB traffic...

  4. Impact of touring, performance schedule, and definitions on 1-year injury rates in a modern dance company.

    Science.gov (United States)

    Bronner, Shaw; Wood, Lily

    2017-11-01

    There is ongoing debate about how to define injury in dance: the most encompassing one or a time-loss definition. We examined the relationship between touring, performance schedule and injury definition on injury rates in a professional modern dance company over one-year. In-house healthcare management tracked 35 dancers for work-related musculoskeletal injuries (WMSI), time-loss injuries (TLinj), complaints, and exposure. The year was divided into 6 segments to allow comparison of effects of performance, rehearsal, and touring. Injuries/segment were converted into injuries/1000-h dance exposure. We conducted negative binomial regression analysis to determine differences between segments, P ≤ 0.05. Twenty WMSI, 0.44 injuries/1000-h, were sustained over one-year. WMSI were 6 times more likely to occur in Segment-6, compared with other segments (incident rate ratio = 6.055, P = 0.031). The highest rate of TLinj and traumatic injuries also occurred in Segment-6, reflecting concentrated rehearsal, New York season and performances abroad. More overuse injuries occurred in Segment-2, an international tour, attributed to raked stages. Lack of methods to quantify performance other than injury may mask effects of touring on dancer's well-being. Tracking complaints permits understanding of stressors to specific body regions and healthcare utilisation; however, TLinj remain the most important injuries to track because they impact other dancers and organisational costs.

  5. NASA's Electric Sail Propulsion System Investigations over the Past Three Years

    Science.gov (United States)

    Wiegmann, Bruce M.

    2017-01-01

    outside of Earth's Magnetic fields to produce thrust. The paper will outline what was done over the past three years from performing various plasma chamber tests to obtain data for the PIC model development, investigation of tether material trades, and conceptual designs of proposed spacecraft.

  6. Scheduling of Irrigation and Leaching Requirements

    Directory of Open Access Journals (Sweden)

    Amer Hassan Al-haddad

    2015-03-01

    Full Text Available Iraq depends mainly on Tigris and Euphrates Rivers to provide high percentage of agricultural water use for thousands years. At last years, Iraq is suffering from shortage in water resources due to global climate changes and unfair water politics of the neighboring countries, which affected the future of agriculture plans for irrigation, added to that the lack of developed systems of water management in the irrigation projects and improper allocation of irrigation water, which reduces water use efficiency and lead to losing irrigation water and decreasing in agricultural yield. This study aims at studying the usability of irrigation and leaching scheduling within the irrigating projects and putting a complete annual or seasonal irrigation program as a solution for the scarcity of irrigation water, the increase of irrigation efficiency, lessening the salinity in the projects and preparing an integral irrigation calendar through field measurements of soil physical properties and chemical for project selected and compared to the results of the irrigation scheduling and leaching with what is proposed by the designers. The process is accomplished by using a computer program which was designed by Water Resources Department at the University of Baghdad, with some modification to generalize it and made it applicable to various climatic zone and different soil types. Study area represented by large project located at the Tigris River, and this project was (Al-Amara irrigation project. Sufficient samples of project's soil were collected so as to identify soil physical and chemical properties and the salinity of soil and water as well as identifying the agrarian cycles virtually applied to this project. Finally, a comparison was conducted between the calculated water quantities and the suggested ones by the designers. The research results showed that using this kind of scheduling (previously prepared irrigation and leaching scheduling with its properties

  7. Home Health Care for California's Injured Workers: Options for Implementing a Fee Schedule.

    Science.gov (United States)

    Wynn, Barbara O; Boustead, Anne

    2015-07-15

    The California Department of Industrial Relations/Division of Worker's Compensation asked RAND to provide technical assistance in developing a fee schedule for home health services provided to injured workers. The fee schedule needs to address the full spectrum of home health services ranging from skilled nursing and therapy services to unskilled personal care or chore services that may be provided by family members. RAND researchers consulted with stakeholders in the California workers' compensation system to outline issues the fee schedule should address, reviewed home health fee schedules used by other payers, and conducted interviews with WC administrators from other jurisdictions to elicit their experiences. California stakeholders identified unskilled attendant services as most problematic in determining need and payment rates, particularly services furnished by family members. RAND researchers concentrated on fee schedule options that would result in a single fee schedule covering the full range of home health care services furnished to injured workers and made three sets of recommendations. The first set pertains to obtaining additional information that would highlight the policy issues likely to occur with the implementation of the fee schedule and alternatives for assessing an injured worker's home health care needs. Another approach conforms most closely with the Labor Code requirements. It would integrate the fee schedules used by Medicare, In-Home Health Supportive Services, and the federal Office of Workers' Compensation. The third approach would base the home health fee schedule on rules used by the federal Office of Workers' Compensation.

  8. Optimal Power Scheduling for an Islanded Hybrid Microgrid

    DEFF Research Database (Denmark)

    Hernández, Adriana Carolina Luna; Aldana, Nelson Leonardo Diaz; Savaghebi, Mehdi

    2016-01-01

    model, wherein the disconnection of the load and not charging the battery when there is surplus of energy are penalized while physical constraints and requirements for a feasible deployment in the real system are considered. The proposed scheduling scheme is tested using a real-time control platform (d...

  9. Protocol-transparent resource sharing in hierarchically scheduled real-time systems

    NARCIS (Netherlands)

    Heuvel, van den M.M.H.P.; Bril, R.J.; Lukkien, J.J.

    2010-01-01

    Hierarchical scheduling frameworks (HSFs) provide means for composing complex real-time systems from well-defined, independently analyzed subsystems. To support resource sharing within two-level HSFs, three synchronization protocols based on the stack resource policy (SRP) have recently been

  10. Improved human performance through appropriate work scheduling

    International Nuclear Information System (INIS)

    Morisseau, D.S.; Lewis, P.M.; Persensky, J.J.

    1987-01-01

    The Nuclear Regulatory Commission (NRC) has had a policy, Generic Letter 82-12, on hours of work since 1982. The policy states that licensees should establish controls to prevent situations where fatigue could reduce the ability of operating personnel to perform their duties safely (USNRC 1982). While that policy does give guidance on hours of work and overtime, it does not address periods of longer than 7 days or work schedules other than the routine 8-hour day, 40-hour week. Recognizing that NRC policy could provide broader guidance for shift schedules and hours of overtime work, the Division of Human Factors Safety conducted a project with Pacific Northwest Laboratories (PNL) to help the NRC better understand the human factors principles and issues concerning hours of work so that the NRC could consider updating their policy as necessary. The results of this project are recommendations for guidelines and limits for periods of 14 days, 28 days, and 1 year to take into account the cumulative effects of fatigue. In addition, routine 12-hour shifts are addressed. This latter type of shift schedule has been widely adopted in the petroleum and chemical industries and several utilities operating nuclear power plants have adopted it as well. Since this is the case, it is important to consider including guidelines for implementing this type of schedule. This paper discusses the bases for the PNL recommendations which are currently being studied by the NRC

  11. Progress Testing for Medical Students at the University of Auckland: Results from the First Year of Assessments

    Directory of Open Access Journals (Sweden)

    Steven Lillis

    2014-01-01

    Full Text Available Background Progress testing is a method of assessing longitudinal progress of students using a single best answer format pitched at the standard of a newly graduated doctor. Aim To evaluate the results of the first year of summative progress testing at the University of Auckland for Years 2 and 4 in 2013. SUBJECTS: Two cohorts of medical students from Years 2 and 4 of the Medical Program. Methods A survey was administered to all involved students. Open text feedback was also sought. Psychometric data were collected on test performance, and indices of reliability and validity were calculated. Results The three tests showed increased mean scores over time. Reliability of the assessments was uniformly high. There was good concurrent validity. Students believe that progress testing assists in integrating science with clinical knowledge and improve learning. Year 4 students reported improved knowledge retention and deeper understanding. Conclusion Progress testing has been successfully introduced into the Faculty for two separate year cohorts and results have met expectations. Other year cohorts will be added incrementally. Recommendation Key success factors for introducing progress testing are partnership with an experienced university, multiple and iterative briefings with staff and students as well as demonstrating the usefulness of progress testing by providing students with detailed feedback on performance.

  12. Reliability and validity of Yo-Yo tests in 9- to 16-year-old football players and matched non-sports active schoolboys

    DEFF Research Database (Denmark)

    Póvoas, Susana C A; Castagna, Carlo; Soares, José M C

    2016-01-01

    The purpose of this study was to examine the test-retest reliability and construct validity of three age-adapted Yo-Yo intermittent tests in football players aged 9-16 years (n = 70) and in age-matched non-sports active boys (n = 72). Within 7 days, each participant performed two repetitions...... performances and HRpeak are reliable for 9- to 16-year-old footballers and non-sports active boys. Additionally, performances of the three Yo-Yo tests were seemingly better for football-trained than for non-sports active boys, providing evidence of construct validity....

  13. A Constraint Logic Programming Framework for the Synthesis of Fault-Tolerant Schedules for Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Poulsen, Kåre Harbo; Pop, Paul; Izosimov, Viacheslav

    2007-01-01

    -execution for recovering from multiple transient faults. We propose three scheduling approaches, which each present a trade-off between schedule simplicity and performance, (i) full transparency, (ii) slack sharing and (iii) conditional, and provide various degrees of transparency. We have developed a CLP framework...

  14. 18 CFR 154.313 - Schedules for minor rate changes.

    Science.gov (United States)

    2010-04-01

    ... of the End of the Test Period. (7) Schedule E. Working Capital. Show the various components provided.... Depreciation, Depletion, Amortization and Negative Salvage Expenses. Show, separately, the gas plant depreciation, depletion, amortization, and negative salvage expenses by functional classifications. For each...

  15. Algorithm for Public Electric Transport Schedule Control for Intelligent Embedded Devices

    Science.gov (United States)

    Alps, Ivars; Potapov, Andrey; Gorobetz, Mikhail; Levchenkov, Anatoly

    2010-01-01

    In this paper authors present heuristics algorithm for precise schedule fulfilment in city traffic conditions taking in account traffic lights. The algorithm is proposed for programmable controller. PLC is proposed to be installed in electric vehicle to control its motion speed and signals of traffic lights. Algorithm is tested using real controller connected to virtual devices and real functional models of real tram devices. Results of experiments show high precision of public transport schedule fulfilment using proposed algorithm.

  16. Hybrid glowworm swarm optimization for task scheduling in the cloud environment

    Science.gov (United States)

    Zhou, Jing; Dong, Shoubin

    2018-06-01

    In recent years many heuristic algorithms have been proposed to solve task scheduling problems in the cloud environment owing to their optimization capability. This article proposes a hybrid glowworm swarm optimization (HGSO) based on glowworm swarm optimization (GSO), which uses a technique of evolutionary computation, a strategy of quantum behaviour based on the principle of neighbourhood, offspring production and random walk, to achieve more efficient scheduling with reasonable scheduling costs. The proposed HGSO reduces the redundant computation and the dependence on the initialization of GSO, accelerates the convergence and more easily escapes from local optima. The conducted experiments and statistical analysis showed that in most cases the proposed HGSO algorithm outperformed previous heuristic algorithms to deal with independent tasks.

  17. Field test corrosion experiences when co-firing straw and coal: 10 year status within Elsam

    DEFF Research Database (Denmark)

    Frandsen, Rasmus Berg; Montgomery, Melanie; Larsen, Ole Hede

    2007-01-01

    and straw at the 150 MW pulverized coal fired boiler Studstrup unit 1. Two exposure series lasting 3000 hours each were performed for co-firing 10 and 20% of straw (% energy basis) with coal. Using built in test tubes in the hot end of the actual superheaters and air/water cooled corrosion probes...... to 575 degrees C and for the flue gas from 1025 to 1300 degrees C. All these test tubes have been removed during the last three years at one year intervals for corrosion studies. The corrosion studies performed on all investigated tubes included measurements of the corrosion attack, light optical...

  18. Pharmacists correcting schedule II prescriptions: DEA flip-flops continue.

    Science.gov (United States)

    Abood, Richard R

    2010-12-01

    The Drug Enforcement Administration (DEA) has in recent years engaged in flip-flopping over important policy decisions. The most recent example involved whether a pharmacist can correct a written schedule II prescription upon verification with the prescriber. For several years the DEA's policy permitted this practice. Then the DEA issued a conflicting policy statement in 2007 in the preamble to the multiple schedule II prescription regulation, causing a series of subsequent contradictory statements ending with the policy that pharmacists should follow state law or policy until the Agency issues a regulation. It is doubtful that the DEA's opinion in the preamble would in itself constitute legal authority, or that the Agency would try to enforce the opinion. Nonetheless, these flip-flop opinions have confused pharmacists, caused some pharmacies to have claims rejected by third party payors, and most likely have inconvenienced patients.

  19. Dynamic Sleep Scheduling on Air Pollution Levels Monitoring with Wireless Sensor Network

    Directory of Open Access Journals (Sweden)

    Gezaq Abror

    2018-01-01

    Full Text Available Wireless Sensor Network (WSN can be applied for Air Pollution Level Monitoring System that have been determined by the Environmental Impact Management Agency which is  PM10, SO2, O3, NO2 and CO. In WSN, node system is constrained to a limited power supply, so that the node system has a lifetime. To doing lifetime maximization, power management scheme is required and sensor nodes should use energy efficiently. This paper proposes dynamic sleep scheduling using Time Category-Fuzzy Logic (Time-Fuzzy Scheduling as a reference for calculating time interval for sleep and activated node system to support power management scheme. This research contributed in power management design to be applied to the WSN system to reduce energy expenditure. From the test result in real hardware node system, it can be seen that Time-Fuzzy Scheduling is better in terms of using the battery and it is better in terms of energy consumption too because it is more efficient 51.85% when it is compared with Fuzzy Scheduling, it is more efficient 68.81% when it is compared with Standard Scheduling and it is more efficient 85.03% when compared with No Scheduling.

  20. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  1. A new genetic algorithm for flexible job-shop scheduling problems

    International Nuclear Information System (INIS)

    Driss, Imen; Mouss, Kinza Nadia; Laggoun, Assia

    2015-01-01

    Flexible job-shop scheduling problem (FJSP), which is proved to be NP-hard, is an extension of the classical job-shop scheduling problem. In this paper, we propose a new genetic algorithm (NGA) to solve FJSP to minimize makespan. This new algorithm uses a new chromosome representation and adopts different strategies for crossover and mutation. The proposed algorithm is validated on a series of benchmark data sets and tested on data from a drug manufacturing company. Experimental results prove that the NGA is more efficient and competitive than some other existing algorithms.

  2. A new genetic algorithm for flexible job-shop scheduling problems

    Energy Technology Data Exchange (ETDEWEB)

    Driss, Imen; Mouss, Kinza Nadia; Laggoun, Assia [University of Batna, Batna (Algeria)

    2015-03-15

    Flexible job-shop scheduling problem (FJSP), which is proved to be NP-hard, is an extension of the classical job-shop scheduling problem. In this paper, we propose a new genetic algorithm (NGA) to solve FJSP to minimize makespan. This new algorithm uses a new chromosome representation and adopts different strategies for crossover and mutation. The proposed algorithm is validated on a series of benchmark data sets and tested on data from a drug manufacturing company. Experimental results prove that the NGA is more efficient and competitive than some other existing algorithms.

  3. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  4. Glyphosate-tolerant soybeans remain compositionally equivalent to conventional soybeans (Glycine max L.) during three years of field testing.

    Science.gov (United States)

    McCann, Melinda C; Liu, Keshun; Trujillo, William A; Dobert, Raymond C

    2005-06-29

    Previous studies have shown that the composition of glyphosate-tolerant soybeans (GTS) and selected processed fractions was substantially equivalent to that of conventional soybeans over a wide range of analytes. This study was designed to determine if the composition of GTS remains substantially equivalent to conventional soybeans over the course of several years and when introduced into multiple genetic backgrounds. Soybean seed samples of both GTS and conventional varieties were harvested during 2000, 2001, and 2002 and analyzed for the levels of proximates, lectin, trypsin inhibitor, and isoflavones. The measured analytes are representative of the basic nutritional and biologically active components in soybeans. Results show a similar range of natural variability for the GTS soybeans as well as conventional soybeans. It was concluded that the composition of commercial GTS over the three years of breeding into multiple varieties remains equivalent to that of conventional soybeans.

  5. Effects of the amount and schedule of varied practice after constant practice on the adaptive process of motor learning

    Directory of Open Access Journals (Sweden)

    Umberto Cesar Corrêa

    2014-12-01

    Full Text Available This study investigated the effects of different amounts and schedules of varied practice, after constant practice, on the adaptive process of motor learning. Participants were one hundred and seven children with a mean age of 11.1 ± 0.9 years. Three experiments were carried out using a complex anticipatory timing task manipulating the following components in the varied practice: visual stimulus speed (experiment 1; sequential response pattern (experiment 2; and visual stimulus speed plus sequential response pattern (experiment 3. In all experiments the design involved three amounts (18, 36, and 63 trials, and two schedules (random and blocked of varied practice. The experiments also involved two learning phases: stabilization and adaptation. The dependent variables were the absolute, variable, and constant errors related to the task goal, and the relative timing of the sequential response. Results showed that all groups worsened the performances in the adaptation phase, and no difference was observed between them. Altogether, the results of the three experiments allow the conclusion that the amounts of trials manipulated in the random and blocked practices did not promote the diversification of the skill since no adaptation was observed.

  6. Implementation of Compressed Work Schedules: Participation and Job Redesign as Critical Factors for Employee Acceptance.

    Science.gov (United States)

    Latack, Janina C.; Foster, Lawrence W.

    1985-01-01

    Analyzes the effects of an implementation of a three-day/thirty-eight hour (3/38) work schedule among information systems personnel (N=84). Data showed that 18 months after implementation, 3/38 employees still strongly favor the compressed schedule. Data also suggest substantial organizational payoffs including reductions in sick time, overtime,…

  7. Feasibility of computerized scheduled gradual reduction for adolescent smoking cessation.

    Science.gov (United States)

    Riley, William; Jerome, Albert; Behar, Albert; Zack, Sharon

    2002-01-01

    The purpose of this project was to modify a smoking cessation program that uses computerized scheduled gradual reduction for use with adolescent smokers and to test the feasibility of this cessation approach in group support and minimal contact modalities. Utilizing a lesson plan approach with high school marketing students in five high schools and student survey feedback, the LifeSign program was modified to be an acceptable smoking cessation program for adolescent smokers. In the first study, 17 adolescent smokers used the modified program with seven associated weekly group support sessions. At the end of treatment, 29% had quit smoking, and over half of those who continued to smoke reduced their smoking rate by 50%. In the second study, the LifeSign for Teens program was evaluated with 18 adolescent smokers in a minimal contact format. At the end of treatment, 17% had quit smoking, and mean smoking rate reductions of 43% were found among those who continued smoking. At 1-year follow-up, all subjects who had quit at posttreatment reported continuous abstinence. The results of these two small trials suggest that a computerized scheduled gradual reduction approach may be an accepted and potentially efficacious approach for smoking cessation among adolescent smokers.

  8. Continuity-Aware Scheduling Algorithm for Scalable Video Streaming

    Directory of Open Access Journals (Sweden)

    Atinat Palawan

    2016-05-01

    Full Text Available The consumer demand for retrieving and delivering visual content through consumer electronic devices has increased rapidly in recent years. The quality of video in packet networks is susceptible to certain traffic characteristics: average bandwidth availability, loss, delay and delay variation (jitter. This paper presents a scheduling algorithm that modifies the stream of scalable video to combat jitter. The algorithm provides unequal look-ahead by safeguarding the base layer (without the need for overhead of the scalable video. The results of the experiments show that our scheduling algorithm reduces the number of frames with a violated deadline and significantly improves the continuity of the video stream without compromising the average Y Peek Signal-to-Noise Ratio (PSNR.

  9. Susceptibility to tulathromycin in Mannheimia haemolytica isolated from feedlot cattle over a three-year period

    Directory of Open Access Journals (Sweden)

    Trevor W. Alexander

    2013-10-01

    Full Text Available Mannheimia haemolytica isolated from feedlot cattle were tested for tulathromycin resistance. Cattle were sampled over a three-year period, starting 12 months after approval of tulathromycin for prevention and treatment of bovine respiratory disease. Nasopharyngeal samples from approximately 5,814 cattle were collected when cattle entered feedlots (N = 4 and again from the same cattle after ≥ 60 d on feed. The antimicrobial use history for each animal was recorded. Mannheimia haemolytica was isolated from 796 (13.7% entry samples and 1,038 (20.6% ≥ 60 d samples. Of the cattle positive for M. haemolytica, 18.5%, 2.9%, and 2.4% were administered therapeutic concentrations of tulathromycin, tilmicosin, or tylosin tartrate, respectively. In addition, 13.2% were administered subtherapeutic concentrations of tylosin phosphate in feed. In years one and two, no tulathromycin-resistant M. haemolytica were detected, whereas 5 isolates (0.4% were resistant in year three. These resistant isolates were collected from three cattle originating from a single pen, were all serotype 1, and were genetically related (≥ 89% similarity according to pulsed-field gel electrophoreses patterns. The five tulathromycin-resistant isolates were multi-drug resistant also exhibiting resistance to oxytetracycline, tilmicosin, ampicillin, or penicillin. The macrolide resistance genes erm(42, erm(A, erm(B, erm(F, erm(X and msr(E-mph(E, were not detected in the tulathromycin-resistant M. haemolytica. This study showed that tulathromycin resistance in M. haemolytica from a general population of feedlot cattle in western Canada was low and did not change over a three-year period after tulathromycin was approved for use in cattle.

  10. The Alternative Work Schedules Experiment: Congressional Oversight Needed to Avoid Likely Failure. Report to the Congress by the Comptroller General of the United States.

    Science.gov (United States)

    General Accounting Office, Washington, DC.

    More than 250,000 federal employees nationwide are participating in a three-year voluntary experiment to find out if the federal government can successfully use flexible and compressed work schedules as alternatives to the traditional eight-hour day, forty-hour workweek. If the experiment is a success, the Congress may modify laws to allow…

  11. Real-time-service-based Distributed Scheduling Scheme for IEEE 802.16j Networks

    OpenAIRE

    Kuo-Feng Huang; Shih-Jung Wu

    2013-01-01

    Supporting Quality of Service (QoS) guarantees for diverse multimedia services is the primary concern for IEEE802.16j networks. A scheduling scheme that satisfies the QoS requirements has become more important for wireless communications. We proposed an adaptive nontransparent-based distributed scheduling scheme (ANDS) for IEEE 802.16j networks. ANDS comprises three major components: Priority Assignment, Resource Allocation, Preserved Bandwidth Adjustment. Different service-type connections p...

  12. Sort-Mid tasks scheduling algorithm in grid computing

    Directory of Open Access Journals (Sweden)

    Naglaa M. Reda

    2015-11-01

    Full Text Available Scheduling tasks on heterogeneous resources distributed over a grid computing system is an NP-complete problem. The main aim for several researchers is to develop variant scheduling algorithms for achieving optimality, and they have shown a good performance for tasks scheduling regarding resources selection. However, using of the full power of resources is still a challenge. In this paper, a new heuristic algorithm called Sort-Mid is proposed. It aims to maximizing the utilization and minimizing the makespan. The new strategy of Sort-Mid algorithm is to find appropriate resources. The base step is to get the average value via sorting list of completion time of each task. Then, the maximum average is obtained. Finally, the task has the maximum average is allocated to the machine that has the minimum completion time. The allocated task is deleted and then, these steps are repeated until all tasks are allocated. Experimental tests show that the proposed algorithm outperforms almost other algorithms in terms of resources utilization and makespan.

  13. Collaborative Distributed Scheduling Approaches for Wireless Sensor Network

    Directory of Open Access Journals (Sweden)

    Zhidong Deng

    2009-10-01

    Full Text Available Energy constraints restrict the lifetime of wireless sensor networks (WSNs with battery-powered nodes, which poses great challenges for their large scale application. In this paper, we propose a family of collaborative distributed scheduling approaches (CDSAs based on the Markov process to reduce the energy consumption of a WSN. The family of CDSAs comprises of two approaches: a one-step collaborative distributed approach and a two-step collaborative distributed approach. The approaches enable nodes to learn the behavior information of its environment collaboratively and integrate sleep scheduling with transmission scheduling to reduce the energy consumption. We analyze the adaptability and practicality features of the CDSAs. The simulation results show that the two proposed approaches can effectively reduce nodes’ energy consumption. Some other characteristics of the CDSAs like buffer occupation and packet delay are also analyzed in this paper. We evaluate CDSAs extensively on a 15-node WSN testbed. The test results show that the CDSAs conserve the energy effectively and are feasible for real WSNs.

  14. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  15. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  16. Three year outcomes in an early intervention service for psychosis in a multicultural and multiethnic population.

    Science.gov (United States)

    Agius, Mark; Shah, Samir; Ramkisson, Roshelle; Persaud, Albert; Murphy, Suzanne; Zaman, Rashid

    2008-12-01

    Concern has been expressed that it may be difficult to provide certain interventions to some ethnic groups in an Early Intervention Service for Psychosis, and that as a consequence, three-year outcomes for the different Ethnic Groups may be different in different groups. To test whether there are differences between the three year outcomes of different ethnic groups represented in the patient population of an Early Intervention service for Psychosis. The three-year outcomes for the first group of 62 Patients to receive three years treatment in the Early Intervention Service in Luton, Bedfordshire were examined. This group well represented the ethnic mix of the population of Luton. It does not appear that there are major differences between the three-year outcomes of any one of the three groups studied. However the South Asian Patients appear to present earlier, with shorter DUPs, seemed more likely to marry, live with their families, and seem more likely to return to higher education after a first psychotic episode of psychosis compared to the Caucasians. Afro-Carribeans and South Asians were more likely to be unemployed, but many South Asians were employed, as were Caucasians. The fewest persons employed were in the Afro-Caribbean group. While slightly more South Asians and Afro-Carribeans were admitted compulsorily under the mental health act over the three years, 60% of each of the two non-white groups were never admitted compulsorily. This is different from the reported national trends of the Mental Health act being used excessively with the Afro-Caribbean population. No previous study has looked at the outcomes of Early Intervention Services for First Psychotic Episodes according to the Ethnic Origin of the Clients. The better outcomes seen with South Asians are probably due to cultural factors among the South Asians born in this country, rather than to issues related to the Psychotic Illness itself. These findings are important in planning services in areas

  17. Analyzing scheduling in the food-processing industry

    DEFF Research Database (Denmark)

    Akkerman, Renzo; van Donk, Dirk Pieter

    2009-01-01

    Production scheduling has been widely studied in several research areas, resulting in a large number of methods, prescriptions, and approaches. However, the impact on scheduling practice seems relatively low. This is also the case in the food-processing industry, where industry......-specific characteristics induce specific and complex scheduling problems. Based on ideas about decomposition of the scheduling task and the production process, we develop an analysis methodology for scheduling problems in food processing. This combines an analysis of structural (technological) elements of the production...... process with an analysis of the tasks of the scheduler. This helps to understand, describe, and structure scheduling problems in food processing, and forms a basis for improving scheduling and applying methods developed in literature. It also helps in evaluating the organisational structures...

  18. Hypothesis Testing Using the Films of the Three Stooges

    Science.gov (United States)

    Gardner, Robert; Davidson, Robert

    2010-01-01

    The use of The Three Stooges' films as a source of data in an introductory statistics class is described. The Stooges' films are separated into three populations. Using these populations, students may conduct hypothesis tests with data they collect.

  19. Master schedule for CY-1979 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Houston, J.R.; Eddy, P.A.

    1978-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site, as conducted by the Environmental Evaluation Section of Battelle, Pacific Northwest Laboratory for the Department of Energy (DOE), is given. Modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, and to monitor Hanford operations for compliance with applicable environmental criteria and Washington State Water Quality Standards. Air quality data are obtained in a separate program administered by the Hanford Environmental Health Foundation. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Water quality data for Hanford Site potable water systems are published each year by the Hanford Environmental Health Foundation. The data collected are available in routine reports issued by the Environmental Evaluations staff. Groundwater data and evaluation are reported in the series, ''Radiological Status of the Groundwater Beneath the Hanford Project for...,'' the latest issue being PNL-2624 for CY-1977. Data from locations within the plant boundaries are presented in the annual ''Environmental Status of the Hanford Site for...'' report series, the most recent report being PNL-2677 for 1977. Data from offsite locations are presented in the annual ''Environmental Surveillance at Hanford for...'' series of reports, the latest being PNL-2614 for 1977

  20. A 12-year cavern abandonment test

    Directory of Open Access Journals (Sweden)

    Brouard B.

    2010-06-01

    Full Text Available In 1997-1998, an abandonment test was performed in a 950-m deep, 8000-m3 salt cavern operated by GDF SUEZ at Etrez, France. In this relatively small brine-filled cavern, which had been kept idle for 15 years before the test, thermal equilibrium was reached. A special system was designed to monitor leaks, which proved to be exceedingly small. In these conditions, brine permeation and cavern creep closure are the only factors to play significant roles in pressure evolution. This test strongly suggested that obtaining an equilibrium pressure such that the effects of these two factors were exactly equal would be reached in the long term. Four years later, pressure monitoring in the closed cavern resumed. Pressure evolution during the 2002-2009 period confirmed that cavern brine pressure will remain constant and significantly smaller than geostatic pressure in the long term, precluding any risk of fracturing and brine seepage to the overburden layers.

  1. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  2. Nurse scheduling in a hospital emergency department: A case study at a Thai university hospital

    Directory of Open Access Journals (Sweden)

    Aussadavut Dumrongsiri

    2018-02-01

    Full Text Available Common problems of Thai nurses are low quality of life, working long hours, and a high turnover rate. The workload imbalance among nurses also worsens the turnover rate. With careful schedule planning, nurses do not have to work in consecutive shifts and can rest more. We interviewed and collected data from an emergency department at a hospital administered by a Thai university, related to objectives and constraints of monthly nurse scheduling, and actual monthly schedules. A multi-objective mathematical model was developed using the open source “OpenSolver” software in MS-Excel for nurse schedulers to freely use. We tested the model using actual data collected from the department and found that the schedules created by the model tended to provide more balanced workloads and more days off compared to the schedules created manually by a real scheduler. The model also suggested an easy policy to increase the number of nurses for future expansion.

  3. Efficacy and Safety of Regorafenib With 2/1 Schedule for Patients ≥ 75 Years With Metastatic Colorectal Cancer (mCRC) After Failure of 2 Lines of Chemotherapy.

    Science.gov (United States)

    Petrioli, Roberto; Chirra, Martina; Messuti, Luciana; Fiaschi, Anna Ida; Savelli, Vinno; Martellucci, Ignazio; Francini, Edoardo

    2018-02-21

    In the CORRECT (patients with metastatic COloRectal Cancer treated with REgorafenib or plaCebo after failure of standard Therapy) trial, regorafenib was proven to extend survival of patients with metastatic colorectal cancer (mCRC) that progressed after all available therapies. Grade 3 to 4 toxicity occurred in 54% of patients, and data on the activity and tolerability of regorafenib in elderly patients were scarce. The aim of this study was to evaluate the efficacy and safety of an alternative schedule, 2-week-on treatment and 1 week-off (2/1 schedule), of regorafenib for elderly patients with mCRC. Patients ≥ 75 years with mCRC who progressed after oxaliplatin- and irinotecan-based chemotherapy received regorafenib on a 2/1 schedule. Potentially frail subjects were identified by G8 screening tool and excluded. The 2-month disease-control rate was the primary endpoint, and the secondary endpoints included safety, progression-free survival (PFS), overall survival (OS), and objective response rate. Between February 2014 and May 2017, 23 patients with mCRC were recruited at our institution. No partial or complete responses were observed, and the stable disease and disease-control rate were 52.2%. The median PFS was 4.8 months (95% confidence interval, 3.8-6.3 months), and the median OS was 8.9 months (95% confidence interval, 6.9-10.6 months). Adverse events were uncommon, and the most frequent grade 3 toxicity adverse events were hand-foot skin reaction (9%) and fatigue (9%). Toxicity-related dose reductions and discontinuations occurred in 5 and 2 patients, respectively. Regorafenib administered with a modified 2/1 schedule to patients who were aged ≥ 75 years and non-frail with treatment-refractory mCRC seems to be tolerable and achieve encouraging results in terms of PFS and OS. Copyright © 2018. Published by Elsevier Inc.

  4. ACER Spelling Test: Years 3-6. Handbook.

    Science.gov (United States)

    Australian Council for Educational Research, Hawthorn.

    The Australian Council for Educational Research (ACER) Spelling Test is designed to measure levels of achievement in spelling and comprises Test Cards, Answer Sheets, Class Analysis Charts and Handbook. The test itself is divided into four parts, one part for each of years 3 through 6 with each part consisting of 50 words. Directions for…

  5. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  6. Impaired Behavior Regulation under Conditions of Concurrent Variable Schedules of Reinforcement in Children with ADHD

    Science.gov (United States)

    Taylor, David; Lincoln, Alan J.; Foster, Sharon L.

    2010-01-01

    Objective: To bridge theory of response inhibition and learning in children with ADHD. Method: Thirty ADHD and 30 non-ADHD children (ages 9-12) were compared under concurrent variable interval (VI-15 sec., VI-30 sec. and VI- 45 sec.) reinforcement schedules that required the child to switch between the three schedules under conditions of…

  7. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  8. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  9. Frequency of hepatitis B (HBV) viral markers in sixth year dental students after three years clinical exposure

    Energy Technology Data Exchange (ETDEWEB)

    Buxt, P; Fairbairn, P J.M.; Stern, S R; Treisman, B [University of the Witwatersrand, Johannesburg (South Africa). Dept. of Oral Pathology

    1981-08-01

    The frequency of Hepatitis B viral markers was studied in 40 6th year dental students at the University of the Witwatersrand, Johannesburg, after three years clinical exposure, using the radioimmunoassay technique. Three were anti-HBs positive; none was HBsAg positive. The frequency of the anti-HBs positive cases did not differ significantly from a group of blood donors, nor were there any statistically significant associated risk factors.

  10. Working Less and Enjoying It More: Alternative Work Schedules.

    Science.gov (United States)

    Shanks, Katherine

    1984-01-01

    Explores three forms of alternative work schedules that research has shown improve job performance and decrease absenteeism: flextime (starting and stopping times vary within limits); permanent part-time employment (regular employment carried out during shorter working hours); and job sharing (two or more part-time employees share one full-time…

  11. Evolutionarily stable learning schedules and cumulative culture in discrete generation models.

    Science.gov (United States)

    Aoki, Kenichi; Wakano, Joe Yuichiro; Lehmann, Laurent

    2012-06-01

    Individual learning (e.g., trial-and-error) and social learning (e.g., imitation) are alternative ways of acquiring and expressing the appropriate phenotype in an environment. The optimal choice between using individual learning and/or social learning may be dictated by the life-stage or age of an organism. Of special interest is a learning schedule in which social learning precedes individual learning, because such a schedule is apparently a necessary condition for cumulative culture. Assuming two obligatory learning stages per discrete generation, we obtain the evolutionarily stable learning schedules for the three situations where the environment is constant, fluctuates between generations, or fluctuates within generations. During each learning stage, we assume that an organism may target the optimal phenotype in the current environment by individual learning, and/or the mature phenotype of the previous generation by oblique social learning. In the absence of exogenous costs to learning, the evolutionarily stable learning schedules are predicted to be either pure social learning followed by pure individual learning ("bang-bang" control) or pure individual learning at both stages ("flat" control). Moreover, we find for each situation that the evolutionarily stable learning schedule is also the one that optimizes the learned phenotype at equilibrium. Copyright © 2012 Elsevier Inc. All rights reserved.

  12. Chemotherapy appointment scheduling under uncertainty using mean-risk stochastic integer programming.

    Science.gov (United States)

    Alvarado, Michelle; Ntaimo, Lewis

    2018-03-01

    Oncology clinics are often burdened with scheduling large volumes of cancer patients for chemotherapy treatments under limited resources such as the number of nurses and chairs. These cancer patients require a series of appointments over several weeks or months and the timing of these appointments is critical to the treatment's effectiveness. Additionally, the appointment duration, the acuity levels of each appointment, and the availability of clinic nurses are uncertain. The timing constraints, stochastic parameters, rising treatment costs, and increased demand of outpatient oncology clinic services motivate the need for efficient appointment schedules and clinic operations. In this paper, we develop three mean-risk stochastic integer programming (SIP) models, referred to as SIP-CHEMO, for the problem of scheduling individual chemotherapy patient appointments and resources. These mean-risk models are presented and an algorithm is devised to improve computational speed. Computational results were conducted using a simulation model and results indicate that the risk-averse SIP-CHEMO model with the expected excess mean-risk measure can decrease patient waiting times and nurse overtime when compared to deterministic scheduling algorithms by 42 % and 27 %, respectively.

  13. Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project

    Directory of Open Access Journals (Sweden)

    Fuqiang Lu

    2017-01-01

    Full Text Available IT outsourcing is an effective way to enhance the core competitiveness for many enterprises. But the schedule risk of IT outsourcing project may cause enormous economic loss to enterprise. In this paper, the Distributed Decision Making (DDM theory and the principal-agent theory are used to build a model for schedule risk management of IT outsourcing project. In addition, a hybrid algorithm combining simulated annealing (SA and genetic algorithm (GA is designed, namely, simulated annealing genetic algorithm (SAGA. The effect of the proposed model on the schedule risk management problem is analyzed in the simulation experiment. Meanwhile, the simulation results of the three algorithms GA, SA, and SAGA show that SAGA is the most superior one to the other two algorithms in terms of stability and convergence. Consequently, this paper provides the scientific quantitative proposal for the decision maker who needs to manage the schedule risk of IT outsourcing project.

  14. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  15. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  16. An extended Intelligent Water Drops algorithm for workflow scheduling in cloud computing environment

    Directory of Open Access Journals (Sweden)

    Shaymaa Elsherbiny

    2018-03-01

    Full Text Available Cloud computing is emerging as a high performance computing environment with a large scale, heterogeneous collection of autonomous systems and flexible computational architecture. Many resource management methods may enhance the efficiency of the whole cloud computing system. The key part of cloud computing resource management is resource scheduling. Optimized scheduling of tasks on the cloud virtual machines is an NP-hard problem and many algorithms have been presented to solve it. The variations among these schedulers are due to the fact that the scheduling strategies of the schedulers are adapted to the changing environment and the types of tasks. The focus of this paper is on workflows scheduling in cloud computing, which is gaining a lot of attention recently because workflows have emerged as a paradigm to represent complex computing problems. We proposed a novel algorithm extending the natural-based Intelligent Water Drops (IWD algorithm that optimizes the scheduling of workflows on the cloud. The proposed algorithm is implemented and embedded within the workflows simulation toolkit and tested in different simulated cloud environments with different cost models. Our algorithm showed noticeable enhancements over the classical workflow scheduling algorithms. We made a comparison between the proposed IWD-based algorithm with other well-known scheduling algorithms, including MIN-MIN, MAX-MIN, Round Robin, FCFS, and MCT, PSO and C-PSO, where the proposed algorithm presented noticeable enhancements in the performance and cost in most situations.

  17. MIIT: International in-situ testing of nuclear-waste glasses: Performance of SRS simulated waste glass after five years of burial at the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Wicks, G.G.; Lodding, A.R.; Macedo, P.B.; Clark, D.E.

    1991-01-01

    In July of 1986, the first in-situ test involving burial of simulated high-level waste (HLW) forms conducted in the United States was started. This program, called the Materials Interface Interactions Test or MIIT, comprises the largest, most cooperative field-testing venture in the international waste management community. In July of 1991, the experimental portion of the 5-year MIIT study was completed on schedule. During this time interval, many in-situ measurements were performed, thousands of brine analyses conducted, and hundreds of waste glass and package components exhumed and evaluated after 6 mo., 1 yr., 2 yr. and 5 yr. burial periods. Although analyses are still in progress, the performance of SRS waste glass based on all data currently available has been seen to be excellent thus far. Initial analyses and assessment of Savannah River (SR) waste glass after burial in WIPP at 90 degrees C for 5 years are presented in this document

  18. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  19. The Three-Step Test-Interview (TSTI: An observation-based method for pretesting self-completion questionnaires

    Directory of Open Access Journals (Sweden)

    Tony Hak

    2008-12-01

    Full Text Available Three-Step Test-Interview (TSTI is a method for pretesting a self-completion questionnaire by first observing actual instances of interaction between the instrument and respondents (the response process before exploring the reasons for this behavior. The TSTI consists of the following three steps: 1. (Respondent-driven observation of response behavior. 2. (Interviewer-driven follow-up probing aimed at remedying gaps in observational data. 3. (Interviewer-driven debriefing aimed at eliciting experiences and opinions. We describe the aims and the techniques of these three steps, and then discuss pilot studies in which we tested the feasibility and the productivity of the TSTI by applying it in testing three rather different types of questionnaires. In the first study, the quality of a set of questions about alcohol consumption was assessed. The TSTI proved to be productive in identifying problems that resulted from a mismatch between the ‘theory’ underlying the questions on the one hand, and features of a respondent’s actual behavior and biography on the other hand. In the second pilot study, Dutch and Norwegian versions of an attitude scale, the 20-item Illegal Aliens Scale, were tested. The TSTI appeared to be productive in identifying problems that resulted from different ‘response strategies’. In the third pilot, a two-year longitudinal study, the TSTI appeared to be an effective method for documenting processes of ‘response shift’ in repeated measurements of health-related Quality of Life (QoL.

  20. Evaluating the marginal utility principle for long-term hydropower scheduling

    International Nuclear Information System (INIS)

    Zhao, Tongtiegang; Zhao, Jianshi; Liu, Pan; Lei, Xiaohui

    2015-01-01

    Highlights: • Analysis of one-, two- and multi-period hydropower scheduling. • Derivation of marginal cost and marginal return of carry-over storage. • Evaluation of the marginal utility principle in a case study of the Three Gorges Reservoir. - Abstract: The conversion of the potential energy of dammed water into hydropower depends on both reservoir storage and release, which are the major difficulties in hydropower reservoir operation. This study evaluates the marginal utility principle, which determines the optimal carry-over storage between periods, for long-term hydropower scheduling. Increasing marginal cost and decreasing marginal return are two important characteristics that determine the marginal utility principle in water supply. However, the notion of decreasing marginal return is inapplicable in hydropower scheduling. Instead, the carry-over storage from one period has an increasing marginal contribution to the power generation in the next period. Although carry-over storage incurs an increasing marginal cost to the power generation in the current period, the marginal return is higher than the marginal cost. The marginal return from the carry-over storage further increases in the multi-period case. These findings suggest saving as much carry-over storage as possible, which is bounded by the operational constraints of storage capacity, environmental flow, and installed capacity in actual hydropower scheduling. The marginal utility principle is evaluated for a case study of the Three Gorges Reservoir, and the effects of the constraints are discussed. Results confirm the theoretical findings and show that the marginal return from carry-over storage is larger than the marginal cost. The operational constraints help determine the optimal carry-over storage.

  1. Constraint based scheduling for the Goddard Space Flight Center distributed Active Archive Center's data archive and distribution system

    Science.gov (United States)

    Short, Nick, Jr.; Bedet, Jean-Jacques; Bodden, Lee; Boddy, Mark; White, Jim; Beane, John

    1994-01-01

    The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been operational since October 1, 1993. Its mission is to support the Earth Observing System (EOS) by providing rapid access to EOS data and analysis products, and to test Earth Observing System Data and Information System (EOSDIS) design concepts. One of the challenges is to ensure quick and easy retrieval of any data archived within the DAAC's Data Archive and Distributed System (DADS). Over the 15-year life of EOS project, an estimated several Petabytes (10(exp 15)) of data will be permanently stored. Accessing that amount of information is a formidable task that will require innovative approaches. As a precursor of the full EOS system, the GSFC DAAC with a few Terabits of storage, has implemented a prototype of a constraint-based task and resource scheduler to improve the performance of the DADS. This Honeywell Task and Resource Scheduler (HTRS), developed by Honeywell Technology Center in cooperation the Information Science and Technology Branch/935, the Code X Operations Technology Program, and the GSFC DAAC, makes better use of limited resources, prevents backlog of data, provides information about resources bottlenecks and performance characteristics. The prototype which is developed concurrently with the GSFC Version 0 (V0) DADS, models DADS activities such as ingestion and distribution with priority, precedence, resource requirements (disk and network bandwidth) and temporal constraints. HTRS supports schedule updates, insertions, and retrieval of task information via an Application Program Interface (API). The prototype has demonstrated with a few examples, the substantial advantages of using HTRS over scheduling algorithms such as a First In First Out (FIFO) queue. The kernel scheduling engine for HTRS, called Kronos, has been successfully applied to several other domains such as space shuttle mission scheduling, demand flow manufacturing, and avionics communications

  2. Sustainable employability in shiftwork: related to types of work schedule rather than age.

    Science.gov (United States)

    Peters, Velibor; Engels, Josephine A; de Rijk, Angelique E; Nijhuis, Frans J N

    2015-10-01

    There is scarce research on age and sustainable employability of nurses working in various types of work schedules. Earlier research showed that nurses working in work schedules differ regarding age. Different operationalisations of age might explain variations in sustainable employability. Therefore, the aim of this study was to investigate how nurses working in various types of work schedule differ regarding sustainable employability, and the role that age plays in these differences. Age was defined as chronological age, organisational age, life-span age, and functional age. Questionnaires were distributed to 974 Dutch nurses in residential elder care (response rate 51 %) with questions about the type of work schedule, aspects of sustainable employability, various operationalisations of age, and registered sickness absence data were used. Nurses working in various types of work schedules differed regarding aspects of sustainable employability, also when operationalisations of age were added. The 'life-span age' was directly related to aspects of sustainable employability. Statistically, work ability and job satisfaction were only explained by varying operationalisations of age. Nurses' sustainable employability appeared to be mainly related to differences between the types of work schedule rather than age. Fixed early shifts are characterised by the most positive aspects of sustainable employability, and three rotating schedules score worst. To improve sustainable employability, organisations should implement a system in which nurses with different types of work schedule are monitored in combination with their life-span perspective.

  3. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  4. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  5. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  6. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  7. Intelligent Scheduling of a Grid-Connected Heat Pump in a Danish Detached House

    DEFF Research Database (Denmark)

    Gianniou, Panagiota; Foteinaki, Kyriaki; Heller, Alfred

    This study proposes a methodology for intelligent scheduling of a heat pump installed in a refurbished grid-connected detached house in Denmark. This scheduling is conducted through the coupling of a dynamic building simulation tool with an optimization tool. The optimization of the operation of ...... thermal comfort conditions. The proposed methodology bridges dynamic building modelling with optimization of real-time operation of HVAC systems offering a detailed model for building physics, especially regarding thermal mass and a stochastic price-based control....... of the system is based on a price-signal considering a three-day period for different weather cases. The results show that the optimal scheduling of the system is successful in terms of reducing the peak load during times when electricity prices are high, thus achieving cost savings as well as maintaining good......This study proposes a methodology for intelligent scheduling of a heat pump installed in a refurbished grid-connected detached house in Denmark. This scheduling is conducted through the coupling of a dynamic building simulation tool with an optimization tool. The optimization of the operation...

  8. A heuristic model for risk and cost impacts of plant outage maintenance schedule

    International Nuclear Information System (INIS)

    Mohammad Hadi Hadavi, S.

    2009-01-01

    Cost and risk are two major competing criteria in maintenance optimization problems. If a plant is forced to shutdown because of accident or fear of accident happening, beside loss of revenue, it causes damage to the credibility and reputation of the business operation. In this paper a heuristic model for incorporating three compelling optimization criteria (i.e., risk, cost, and loss) into a single evaluation function is proposed. Such a model could be used in any evaluation engine of outage maintenance schedule optimizer. It is attempted to make the model realistic and to address the ongoing challenges facing a schedule planner in a simple and commonly understandable fashion. Two simple competing schedules for the NPP feedwater system are examined against the model. The results show that while the model successfully addresses the current challenges for outage maintenance optimization, it properly demonstrates the dynamics of schedule in regards to risk, cost, and losses endured by maintenance schedule, particularly when prolonged outage and lack of maintenance for equipments in need of urgent care are of concern.

  9. Optimizing the Steel Plate Storage Yard Crane Scheduling Problem Using a Two Stage Planning/Scheduling Approach

    DEFF Research Database (Denmark)

    Hansen, Anders Dohn; Clausen, Jens

    This paper presents the Steel Plate Storage Yard Crane Scheduling Problem. The task is to generate a schedule for two gantry cranes sharing tracks. The schedule must comply with a number of constraints and at the same time be cost efficient. We propose some ideas for a two stage planning...

  10. Performance analysis of job scheduling policies in parallel supercomputing environments

    Energy Technology Data Exchange (ETDEWEB)

    Naik, V.K.; Squillante, M.S. [IBM T.J. Watson Research Center, Yorktown Heights, NY (United States); Setia, S.K. [George Mason Univ., Fairfax, VA (United States). Dept. of Computer Science

    1993-12-31

    In this paper the authors analyze three general classes of scheduling policies under a workload typical of largescale scientific computing. These policies differ in the manner in which processors are partitioned among the jobs as well as the way in which jobs are prioritized for execution on the partitions. Their results indicate that existing static schemes do not perform well under varying workloads. Adaptive policies tend to make better scheduling decisions, but their ability to adjust to workload changes is limited. Dynamic partitioning policies, on the other hand, yield the best performance and can be tuned to provide desired performance differences among jobs with varying resource demands.

  11. Status and schedule of J-PARC 50 GeV synchrotron

    International Nuclear Information System (INIS)

    Oogoe, Takao; Yoshioka, Masakazu; Kobayashi, Hitoshi; Takeuchi, Yasunori; Shirakata, Masashi; Shirakabe, Yoshihisa; Kuniyasu, Yuu; Oki, Hiroshi; Takiyama, Youichi

    2005-01-01

    Japan Proton Accelerator Research Complex (J-PARC) is the research complex based on three high intensity proton Accelerators: a linac, a 3 GeV synchrotron (RCS), and a 50 GeV synchrotron (MR). The construction of the MR started in 2002, and its beam commissioning is scheduled in January of 2008. The accelerator tunnel of the J-PARC 50 GeV Synchrotron is still under construction, and will be completed at the end of 2006. Installation of accelerator-components is scheduled to start in July 2005 in parallel with civil and utility construction. This document describes how to install accelerator components in the tunnel and civil engineering of the tunnel. (author)

  12. Thyroid cancers: a three year retrospective histopathological study

    International Nuclear Information System (INIS)

    Than-Than-Htwe; Maung-Ko

    2001-01-01

    A laboratory based retrospective study was done on thyroid tissue specimen that were received from the surgically removed thyroid swellings of various reasons. It was a three year study from 1996-1998 with a total number of cases as (n=1690). Cases were between the age range of 8-88 years including both sexes. A routine histopathological examination was done according to the standard WHO classification, using conventional methods and techniques of specimen sectioning and processing. Occurrence of thyroid cancer among total cases of thyroid dysfunction is highly significant (P 0.860). The results obtained were discussed. (author)

  13. Variable Neighborhood Search for Parallel Machines Scheduling Problem with Step Deteriorating Jobs

    Directory of Open Access Journals (Sweden)

    Wenming Cheng

    2012-01-01

    Full Text Available In many real scheduling environments, a job processed later needs longer time than the same job when it starts earlier. This phenomenon is known as scheduling with deteriorating jobs to many industrial applications. In this paper, we study a scheduling problem of minimizing the total completion time on identical parallel machines where the processing time of a job is a step function of its starting time and a deteriorating date that is individual to all jobs. Firstly, a mixed integer programming model is presented for the problem. And then, a modified weight-combination search algorithm and a variable neighborhood search are employed to yield optimal or near-optimal schedule. To evaluate the performance of the proposed algorithms, computational experiments are performed on randomly generated test instances. Finally, computational results show that the proposed approaches obtain near-optimal solutions in a reasonable computational time even for large-sized problems.

  14. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  15. Thirty Years on--A Large Anti-Flynn Effect? (II): 13- and 14-Year-Olds. Piagetian Tests of Formal Operations Norms 1976-2006/7

    Science.gov (United States)

    Shayer, Michael; Ginsburg, Denise

    2009-01-01

    Background: Shayer, Ginsburg, and Coe (2007) showed that children leaving primary school in Y6 entered secondary school with much lower levels of understanding of the physical conservations than in 1976. It seemed desirable to investigate cognitive development in the first three years of secondary education. Aims: By using two Piagetian tests of…

  16. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  17. Drop tests of the Three Mile Island knockout canister

    International Nuclear Information System (INIS)

    Box, W.D.; Aaron, W.S.; Shappert, L.B.; Childress, P.C.; Quinn, G.J.; Smith, J.V.

    1986-09-01

    A type of Three Mile Island Unit 2 (TMI-2) defueling canister, called a ''knockout'' canister, was subjected to a series of drop tests at the Oak Ridge National Laboratory's Drop Test Facility. These tests were designed to confirm the structural integrity of internal fixed neutron poisons in support of a request for NRC licensing of this type of canister for the shipment of TMI-2 reactor fuel debris to the Idaho National Engineering Laboratory (INEL) for the Core Examination R and D Program. Work conducted at the Oak Ridge National Laboratory included (1) precise physical measurements of the internal poison rod configuration before assembly, (2) canister assembly and welding, (3) nondestructive examination (an initial hydrostatic pressure test and an x-ray profile of the internals before and after each drop test), (4) addition of a simulated fuel load, (5) instrumentation of the canister for each drop test, (6) fabrication of a cask simulation vessel with a developed and tested foam impact limiter, (7) use of refrigeration facilities to cool the canister to well below freezing prior to three of the drops, (8) recording the drop test with still, high-speed, and normal-speed photography, (9) recording the accelerometer measurements during impact, (10) disassembly and post-test examination with precise physical measurements, and (11) preparation of the final report

  18. Applying dynamic priority scheduling scheme to static systems of pinwheel task model in power-aware scheduling.

    Science.gov (United States)

    Seol, Ye-In; Kim, Young-Kuk

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.

  19. Project Rio Blanco definition plan. Additional formation evaluation and production testing

    International Nuclear Information System (INIS)

    1975-09-01

    Since the multiple Rio Blanco detonation three reentry wells have been drilled for test purposes: RB-E-01 (Emplacement Well); RB-AR-2 (Alternate Reentry Well); and RB-U-4 (Formation Evaluation Well). Additional testing in all these wells is now required to resolve some remaining technical questions. A plan describing the procedures, methods, responsibilities, and scheduling of the field operations is presented

  20. A review of metaheuristic scheduling techniques in cloud computing

    Directory of Open Access Journals (Sweden)

    Mala Kalra

    2015-11-01

    Full Text Available Cloud computing has become a buzzword in the area of high performance distributed computing as it provides on-demand access to shared pool of resources over Internet in a self-service, dynamically scalable and metered manner. Cloud computing is still in its infancy, so to reap its full benefits, much research is required across a broad array of topics. One of the important research issues which need to be focused for its efficient performance is scheduling. The goal of scheduling is to map tasks to appropriate resources that optimize one or more objectives. Scheduling in cloud computing belongs to a category of problems known as NP-hard problem due to large solution space and thus it takes a long time to find an optimal solution. There are no algorithms which may produce optimal solution within polynomial time to solve these problems. In cloud environment, it is preferable to find suboptimal solution, but in short period of time. Metaheuristic based techniques have been proved to achieve near optimal solutions within reasonable time for such problems. In this paper, we provide an extensive survey and comparative analysis of various scheduling algorithms for cloud and grid environments based on three popular metaheuristic techniques: Ant Colony Optimization (ACO, Genetic Algorithm (GA and Particle Swarm Optimization (PSO, and two novel techniques: League Championship Algorithm (LCA and BAT algorithm.