WorldWideScience

Sample records for schedule date opponent

  1. Earliness-tardiness scheduling around almost equal due dates

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Velde, van de S.L.

    1997-01-01

    The just-in-time concept in manufacturing has aroused interest in machine scheduling problems with earliness-tardiness penalties. In particular, common due date problems, which are structurally less complicated than problems with general due dates, have emerged as an interesting and fruitful field

  2. Single-machine scheduling with release dates, due dates and family setup times

    NARCIS (Netherlands)

    Schutten, Johannes M.J.; van de Velde, S.L.; van de Velde, S.L.; Zijm, Willem H.M.

    1996-01-01

    We address the NP-hard problem of scheduling n independent jobs with release dates, due dates, and family setup times on a single machine to minimize the maximum lateness. This problem arises from the constant tug-of-war going on in manufacturing between efficient production and delivery

  3. Single-machine scheduling with release dates, due dates, and family setup times

    NARCIS (Netherlands)

    J.M.J. Schutten (Marco); S.L. van de Velde (Steef); W.H.M. Zijm

    1996-01-01

    textabstractWe address the NP-hard problem of scheduling n independent jobs with release dates, due dates, and family setup times on a single machine to minimize the maximum lateness. This problem arises from the constant tug-of-war going on in manufacturing between efficient production and delivery

  4. Single machine scheduling with slack due dates assignment

    Science.gov (United States)

    Liu, Weiguo; Hu, Xiangpei; Wang, Xuyin

    2017-04-01

    This paper considers a single machine scheduling problem in which each job is assigned an individual due date based on a common flow allowance (i.e. all jobs have slack due date). The goal is to find a sequence for jobs, together with a due date assignment, that minimizes a non-regular criterion comprising the total weighted absolute lateness value and common flow allowance cost, where the weight is a position-dependent weight. In order to solve this problem, an ? time algorithm is proposed. Some extensions of the problem are also shown.

  5. A canned food scheduling problem with batch due date

    Science.gov (United States)

    Chung, Tsui-Ping; Liao, Ching-Jong; Smith, Milton

    2014-09-01

    This article considers a canned food scheduling problem where jobs are grouped into several batches. Jobs can be sent to the next operation only when all the jobs in the same batch have finished their processing, i.e. jobs in a batch, have a common due date. This batch due date problem is quite common in canned food factories, but there is no efficient heuristic to solve the problem. The problem can be formulated as an identical parallel machine problem with batch due date to minimize the total tardiness. Since the problem is NP hard, two heuristics are proposed to find the near-optimal solution. Computational results comparing the effectiveness and efficiency of the two proposed heuristics with an existing heuristic are reported and discussed.

  6. Opponent Classification in Poker

    Science.gov (United States)

    Ahmad, Muhammad Aurangzeb; Elidrisi, Mohamed

    Modeling games has a long history in the Artificial Intelligence community. Most of the games that have been considered solved in AI are perfect information games. Imperfect information games like Poker and Bridge represent a domain where there is a great deal of uncertainty involved and additional challenges with respect to modeling the behavior of the opponent etc. Techniques developed for playing imperfect games also have many real world applications like repeated online auctions, human computer interaction, opponent modeling for military applications etc. In this paper we explore different techniques for playing poker, the core of these techniques is opponent modeling via classifying the behavior of opponent according to classes provided by domain experts. We utilize windows of full observation in the game to classify the opponent. In Poker, the behavior of an opponent is classified into four standard poker-playing styles based on a subjective function.

  7. Exploring Opponent Formats

    DEFF Research Database (Denmark)

    Jensen, Mads Møller; Rasmussen, Majken; Grønbæk, Kaj

    2013-01-01

    of how the opponent format and relationships impact a game are almost absent in current research. Thus, this paper aims to elucidate how the perception of a competition differs, depending on the opponent format, by presenting a game mechanic framework. The paper furthermore presents an interactive...... football-training platform, as well as games designed to explore the different opponent formats. The games are qualitatively evaluated to illuminate the qualities of and distinctions between different types of opponent formats, proposed by the framework terminology....

  8. 7 CFR 29.9404 - Marketing area opening dates and marketing schedules.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Marketing area opening dates and marketing schedules... MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE COMMODITY....9404 Marketing area opening dates and marketing schedules. (a) The Flue-Cured Tobacco Advisory...

  9. A Local Search Algorithm for the Flow Shop Scheduling Problem with Release Dates

    Directory of Open Access Journals (Sweden)

    Tao Ren

    2015-01-01

    Full Text Available This paper discusses the flow shop scheduling problem to minimize the makespan with release dates. By resequencing the jobs, a modified heuristic algorithm is obtained for handling large-sized problems. Moreover, based on some properties, a local search scheme is provided to improve the heuristic to gain high-quality solution for moderate-sized problems. A sequence-independent lower bound is presented to evaluate the performance of the algorithms. A series of simulation results demonstrate the effectiveness of the proposed algorithms.

  10. Minimizing Total Completion Time For Preemptive Scheduling With Release Dates And Deadline Constraints

    Directory of Open Access Journals (Sweden)

    He Cheng

    2014-02-01

    Full Text Available It is known that the single machine preemptive scheduling problem of minimizing total completion time with release date and deadline constraints is NP- hard. Du and Leung solved some special cases by the generalized Baker's algorithm and the generalized Smith's algorithm in O(n2 time. In this paper we give an O(n2 algorithm for the special case where the processing times and deadlines are agreeable. Moreover, for the case where the processing times and deadlines are disagreeable, we present two properties which could enable us to reduce the range of the enumeration algorithm

  11. Integrated Scheduling of Production and Distribution with Release Dates and Capacitated Deliveries

    Directory of Open Access Journals (Sweden)

    Xueling Zhong

    2016-01-01

    Full Text Available This paper investigates an integrated scheduling of production and distribution model in a supply chain consisting of a single machine, a customer, and a sufficient number of homogeneous capacitated vehicles. In this model, the customer places a set of orders, each of which has a given release date. All orders are first processed nonpreemptively on the machine and then batch delivered to the customer. Two variations of the model with different objective functions are studied: one is to minimize the arrival time of the last order plus total distribution cost and the other is to minimize total arrival time of the orders plus total distribution cost. For the former one, we provide a polynomial-time exact algorithm. For the latter one, due to its NP-hard property, we provide a heuristic with a worst-case ratio bound of 2.

  12. Nuclear opponents and party politics

    International Nuclear Information System (INIS)

    Tollmann, A.

    1987-01-01

    The question treated in this article is: what do the members of the Austrian parliament - of the different parties - against nuclear energy, in particular against nuclear installations in neighbour countries? Of special interest is the Green party, now also represented in the parliament. The conclusion is that even this party, though in principle definitely anti-nuclear, is of no help to nuclear opponents in general, and to the Working Group No to Zwentendorf in particular. (qui)

  13. Meta-heuristic algorithms for parallel identical machines scheduling problem with weighted late work criterion and common due date.

    Science.gov (United States)

    Xu, Zhenzhen; Zou, Yongxing; Kong, Xiangjie

    2015-01-01

    To our knowledge, this paper investigates the first application of meta-heuristic algorithms to tackle the parallel machines scheduling problem with weighted late work criterion and common due date ([Formula: see text]). Late work criterion is one of the performance measures of scheduling problems which considers the length of late parts of particular jobs when evaluating the quality of scheduling. Since this problem is known to be NP-hard, three meta-heuristic algorithms, namely ant colony system, genetic algorithm, and simulated annealing are designed and implemented, respectively. We also propose a novel algorithm named LDF (largest density first) which is improved from LPT (longest processing time first). The computational experiments compared these meta-heuristic algorithms with LDF, LPT and LS (list scheduling), and the experimental results show that SA performs the best in most cases. However, LDF is better than SA in some conditions, moreover, the running time of LDF is much shorter than SA.

  14. Human wagering behavior depends on opponents' faces.

    Directory of Open Access Journals (Sweden)

    Erik J Schlicht

    Full Text Available Research in competitive games has exclusively focused on how opponent models are developed through previous outcomes and how peoples' decisions relate to normative predictions. Little is known about how rapid impressions of opponents operate and influence behavior in competitive economic situations, although such subjective impressions have been shown to influence cooperative decision-making. This study investigates whether an opponent's face influences players' wagering decisions in a zero-sum game with hidden information. Participants made risky choices in a simplified poker task while being presented opponents whose faces differentially correlated with subjective impressions of trust. Surprisingly, we find that threatening face information has little influence on wagering behavior, but faces relaying positive emotional characteristics impact peoples' decisions. Thus, people took significantly longer and made more mistakes against emotionally positive opponents. Differences in reaction times and percent correct were greatest around the optimal decision boundary, indicating that face information is predominantly used when making decisions during medium-value gambles. Mistakes against emotionally positive opponents resulted from increased folding rates, suggesting that participants may have believed that these opponents were betting with hands of greater value than other opponents. According to these results, the best "poker face" for bluffing may not be a neutral face, but rather a face that contains emotional correlates of trustworthiness. Moreover, it suggests that rapid impressions of an opponent play an important role in competitive games, especially when people have little or no experience with an opponent.

  15. Single Machine Scheduling and Due Date Assignment with Past-Sequence-Dependent Setup Time and Position-Dependent Processing Time

    Directory of Open Access Journals (Sweden)

    Chuan-Li Zhao

    2014-01-01

    Full Text Available This paper considers single machine scheduling and due date assignment with setup time. The setup time is proportional to the length of the already processed jobs; that is, the setup time is past-sequence-dependent (p-s-d. It is assumed that a job's processing time depends on its position in a sequence. The objective functions include total earliness, the weighted number of tardy jobs, and the cost of due date assignment. We analyze these problems with two different due date assignment methods. We first consider the model with job-dependent position effects. For each case, by converting the problem to a series of assignment problems, we proved that the problems can be solved in On4 time. For the model with job-independent position effects, we proved that the problems can be solved in On3 time by providing a dynamic programming algorithm.

  16. Resource Constrained Project Scheduling Subject to Due Dates: Preemption Permitted with Penalty

    Directory of Open Access Journals (Sweden)

    Behrouz Afshar-Nadjafi

    2014-01-01

    Full Text Available Extensive research works have been carried out in resource constrained project scheduling problem. However, scarce researches have studied the problems in which a setup cost must be incurred if activities are preempted. In this research, we investigate the resource constrained project scheduling problem to minimize the total project cost, considering earliness-tardiness and preemption penalties. A mixed integer programming formulation is proposed for the problem. The resulting problem is NP-hard. So, we try to obtain a satisfying solution using simulated annealing (SA algorithm. The efficiency of the proposed algorithm is tested based on 150 randomly produced examples. Statistical comparison in terms of the computational times and objective function indicates that the proposed algorithm is efficient and effective.

  17. Asymptotic analysis of SPTA-based algorithms for no-wait flow shop scheduling problem with release dates.

    Science.gov (United States)

    Ren, Tao; Zhang, Chuan; Lin, Lin; Guo, Meiting; Xie, Xionghang

    2014-01-01

    We address the scheduling problem for a no-wait flow shop to optimize total completion time with release dates. With the tool of asymptotic analysis, we prove that the objective values of two SPTA-based algorithms converge to the optimal value for sufficiently large-sized problems. To further enhance the performance of the SPTA-based algorithms, an improvement scheme based on local search is provided for moderate scale problems. New lower bound is presented for evaluating the asymptotic optimality of the algorithms. Numerical simulations demonstrate the effectiveness of the proposed algorithms.

  18. Asymptotic Analysis of SPTA-Based Algorithms for No-Wait Flow Shop Scheduling Problem with Release Dates

    Directory of Open Access Journals (Sweden)

    Tao Ren

    2014-01-01

    Full Text Available We address the scheduling problem for a no-wait flow shop to optimize total completion time with release dates. With the tool of asymptotic analysis, we prove that the objective values of two SPTA-based algorithms converge to the optimal value for sufficiently large-sized problems. To further enhance the performance of the SPTA-based algorithms, an improvement scheme based on local search is provided for moderate scale problems. New lower bound is presented for evaluating the asymptotic optimality of the algorithms. Numerical simulations demonstrate the effectiveness of the proposed algorithms.

  19. Maximum Lateness Scheduling on Two-Person Cooperative Games with Variable Processing Times and Common Due Date

    Directory of Open Access Journals (Sweden)

    Peng Liu

    2017-01-01

    Full Text Available A new maximum lateness scheduling model in which both cooperative games and variable processing times exist simultaneously is considered in this paper. The job variable processing time is described by an increasing or a decreasing function dependent on the position of a job in the sequence. Two persons have to cooperate in order to process a set of jobs. Each of them has a single machine and their processing cost is defined as the minimum value of maximum lateness. All jobs have a common due date. The objective is to maximize the multiplication of their rational positive cooperative profits. A division of those jobs should be negotiated to yield a reasonable cooperative profit allocation scheme acceptable to them. We propose the sufficient and necessary conditions for the problems to have positive integer solution.

  20. Visual comfort evaluated by opponent colors

    Science.gov (United States)

    Sagawa, Ken

    2002-06-01

    This study aimed to evaluate psychological impression of visual comfort when we see an image of ordinary colored scene presented in a color display. Effects of opponent colors, i.e. red, green, yellow and blue component, on the subjective judgement on visual comfort to the image were investigated. Three kinds of psychological experiment were designed to see the effects and the results indicated that the red/green opponent color component was more affecting than the yellow-blue one, and red color in particular was the most affecting factor on visual comfort.

  1. Anterior EEG asymmetries and opponent process theory.

    Science.gov (United States)

    Kline, John P; Blackhart, Ginette C; Williams, William C

    2007-03-01

    The opponent process theory of emotion [Solomon, R.L., and Corbit, J.D. (1974). An opponent-process theory of motivation: I. Temporal dynamics of affect. Psychological Review, 81, 119-143.] predicts a temporary reversal of emotional valence during the recovery from emotional stimulation. We hypothesized that this affective contrast would be apparent in asymmetrical activity patterns in the frontal lobes, and would be more apparent for left frontally active individuals. The present study tested this prediction by examining EEG asymmetries during and after blocked presentations of aversive pictures selected from the International Affective Picture System (IAPS). 12 neutral images, 12 aversive images, and 24 neutral images were presented in blocks. Participants who were right frontally active at baseline did not show changes in EEG asymmetry while viewing aversive slides or after cessation. Participants left frontally active at baseline, however, exhibited greater relative left frontal activity after aversive stimulation than before stimulation. Asymmetrical activity patterns in the frontal lobes may relate to affect regulatory processes, including contrasting opponent after-reactions to aversive stimuli.

  2. P1-12: Different Double-Pulse Distinguishability Among the Luminance Opponency, the Red-Green Opponency, and the Blue-Yellow Opponency

    Directory of Open Access Journals (Sweden)

    Lin Shi

    2012-10-01

    Full Text Available The inter-stimuli-interval (ISI thresholds of double pulses discrimination were measured to investigate the temporal distinguishability of double pulses of the luminance opponency, the red-green opponency, and the blue-yellow opponency. Double pulses were presented randomly in one of four quadrants, defined by a central fixation cross on a CRT display controlled by the real time sequencer (RTS of the VSG system in 42-bit color mode calibrated with less than 3% display error rate of the 1931 CIE luminance and chromatic coordinate. Each pulse was of duration 6.7 msec and included a Gaussian patch with gradation of tristimulus values from the peak to the background in equal-energy-white (the luminance opponency or isoluminance (the red-green and the blue-yellow opponency configuration. Eleven observers were asked to report the number of pulses (one or two observed while ISI was adjusted by a psi method. Psychometric functions were estimated using the cumulative distribution function of the extreme value distribution. The threshold was the ISI value corresponding with the rate of 63.21% correct answer. Significant differences were found among ISI thresholds of the luminance, blue-yellow, and red-green opponency. Results supported that the temporal distinguishability of double pulses of the luminance opponency, the red-green opponency, and the blue-yellow opponency were significantly different. The difference can be explained by the impulse response functions (IRF with various first peak time among the luminance opponency, the red-green opponency, and the blue-yellow opponency.

  3. A Pyrrhic victory for the opponents

    International Nuclear Information System (INIS)

    Haag, J.

    2000-01-01

    This article reviews the situation of renewable energies in Switzerland after a popular vote turned down promotional measures in the year 2000. The situation is analysed and the opinions of various leaders of professional associations and political groups are discussed. Comparisons are made between ideas said to evolve from short-term narrow-mindedness and those developed by more visionary corporations and governments. The effect of the negative outcome of the popular vote on research and development and economic development are discussed. The author expresses his opinion that measures will still have to be taken, thus making the opponents' success more of a Pyrrhic sort of victory

  4. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  5. Nuclear opponents sentenced to pay electricity rates

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    In its decison of March 19, 1980 the Local Court of Hamburg sentenced a nuclear opponent to pay the sum withheld to the electricity supply utility. He had remitted 10 per cent of the rate on a blocked account. A right to refuse payment cannot be founded on Art. 4 of the Basic Law, since the freedom of conscience is not unilimited but may be restricted by the legal system or by obligations undertaken by oneself. Nor does the defendant have a right to withhold, since he is not entitled to a counter-claim from the power supply contract. Against the right to refuse payment in good faith speaks the fact that the plaintiff operates the nuclear power plant legally persuant to a licence. Even if the licence was withdrawn by an administrative court, this would not abolish with retroactive effect the existing reasonability of payment. (HSCH) [de

  6. A Color-Opponency Based Biological Model for Color Constancy

    Directory of Open Access Journals (Sweden)

    Yongjie Li

    2011-05-01

    Full Text Available Color constancy is the ability of the human visual system to adaptively correct color-biased scenes under different illuminants. Most of the existing color constancy models are nonphysiologically plausible. Among the limited biological models, the great majority is Retinex and its variations, and only two or three models directly simulate the feature of color-opponency, but only of the very earliest stages of visual pathway, i.e., the single-opponent mechanisms involved at the levels of retinal ganglion cells and lateral geniculate nucleus (LGN neurons. Considering the extensive physiological evidences supporting that both the single-opponent cells in retina and LGN and the double-opponent neurons in primary visual cortex (V1 are the building blocks for color constancy, in this study we construct a color-opponency based color constancy model by simulating the opponent fashions of both the single-opponent and double-opponent cells in a forward manner. As for the spatial structure of the receptive fields (RF, both the classical RF (CRF center and the nonclassical RF (nCRF surround are taken into account for all the cells. The proposed model was tested on several typical image databases commonly used for performance evaluation of color constancy methods, and exciting results were achieved.

  7. Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-04-01

    Full Text Available This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost.

  8. Maximum Lateness Scheduling on Two-Person Cooperative Games with Variable Processing Times and Common Due Date

    OpenAIRE

    Liu, Peng; Wang, Xiaoli

    2017-01-01

    A new maximum lateness scheduling model in which both cooperative games and variable processing times exist simultaneously is considered in this paper. The job variable processing time is described by an increasing or a decreasing function dependent on the position of a job in the sequence. Two persons have to cooperate in order to process a set of jobs. Each of them has a single machine and their processing cost is defined as the minimum value of maximum lateness. All jobs have a common due ...

  9. An Opponent-Process Theory of Motivation: II. Cigarette Addiction

    Science.gov (United States)

    Solomon, Richard L.; Corbit, John D.

    1973-01-01

    Methods suggested by opponent-process theory of acquired motivation in helping smokers to quit the habit include use of antagonistic drugs, total cessation from tobacco, and decrease in intensity and frequency of tobacco use. (DS)

  10. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  11. Effect of opponent type on moral emotions and responses to video game play.

    Science.gov (United States)

    Lin, Shu-Fang

    2011-11-01

    This study suggests that fighting against different types of opponents in video games (e.g., human opponents vs. monster opponents) may lead to different emotional responses and moral judgments toward game characters. Based on Bandura's moral disengagement theory, this study proposes that shooting at monster opponents makes game players feel less guilty and judge the player-controlled character as more morally justified. An experiment was conducted in which participants played shooting games with either human opponents or monster opponents. The results show that when playing against monster opponents, participants felt both less ashamed and less guilty, reported enjoying the game more, and judged their character as more justified than participants who played against human opponents.

  12. Opponent process properties of self-administered cocaine.

    Science.gov (United States)

    Ettenberg, Aaron

    2004-01-01

    Over the past decade, data collected in our laboratory have demonstrated that self-administered cocaine produces Opponent-Process-like behavioral effects. Animals running a straight alley once each day for IV cocaine develop over trials an approach-avoidance conflict about re-entering the goal box. This conflict behavior is characterized by a stop in forward locomotion (usually at the very mouth of the goal box) followed by a turn and 'retreat' back toward the goal box. The results of a series of studies conducted over the past decade collectively suggest that the behavioral ambivalence exemplified by rats running the alley for IV cocaine stems from concurrent and opponent positive (rewarding) and negative (anxiogenic) properties of the drug--both of which are associated with the goal box. These opponent properties of cocaine have been shown to result from temporally distinct affective states. Using a conditioned place preference test, we have been able to demonstrate that while the initial immediate effects of IV cocaine are reinforcing, the state present 15 min post-injection is aversive. In our most recent work, the co-administration of IV cocaine with either oral ethanol or IV heroin was found to greatly diminish the development and occurrence of retreat behaviors in the runway. It may therefore be that the high incidence of co-abuse of cocaine with either ethanol or heroin, stems from the users' motivation to alleviate some of the negative side effects of cocaine. It would seem then that the Opponent Process Theory has provided a useful conceptual framework for the study of the behavioral consequences of self-administered cocaine including the notion that both positive and negative reinforcement mechanisms are involved in the development and maintenance of cocaine abuse.

  13. Hue opponency: chromatic valence functions, individual differences, cortical winner-take-all opponent modeling, and the relationship between spikes and sensitivity.

    Science.gov (United States)

    Billock, Vincent A

    2018-04-01

    Neural spike rate data are more restricted in range than related psychophysical data. For example, several studies suggest a compressive (roughly cube root) nonlinear relationship between wavelength-opponent spike rates in primate midbrain and color appearance in humans, two rather widely separated domains. This presents an opportunity to partially bridge a chasm between these two domains and to probe the putative nonlinearity with other psychophysical data. Here neural wavelength-opponent data are used to create cortical competition models for hue opponency. This effort led to creation of useful models of spiking neuron winner-take-all (WTA) competition and MAX selection. When fed with actual primate data, the spiking WTA models generate reasonable wavelength-opponent spike rate behaviors. An average psychophysical observer for red-green and blue-yellow opponency is curated from eight applicable studies in the refereed and dissertation literatures, with cancellation data roughly every 10 nm in 18 subjects for yellow-blue opponency and 15 subjects for red-green opponency. A direct mapping between spiking neurons with broadband wavelength sensitivity and human psychophysical luminance yields a power law exponent of 0.27, similar to the cube root nonlinearity. Similarly, direct mapping between the WTA model opponent spike rates and psychophysical opponent data suggests power law relationships with exponents between 0.24 and 0.41.

  14. Improved Hybrid Opponent System for Professional Military Training

    Directory of Open Access Journals (Sweden)

    Michael Pelosi

    2017-10-01

    Full Text Available Described herein is a general-purpose software engineering architecture for autonomous, computer controlled opponent implementation in modern maneuver warfare simulation and training. The implementation has been developed, refined, and tested in the user crucible for several years. The approach represents a hybrid application of various well-known AI techniques, including domain modeling, agent modeling, and object-oriented programming. Inspired by computer chess approaches, the methodology combines this theoretical foundation with a hybrid and scalable portfolio of additional techniques. The result remains simple enough to be maintainable, comprehensible for the code writers as well as the end-users, and robust enough to handle a wide spectrum of possible mission scenarios and circumstances without modification.

  15. A Mathematical Model for Scheduling a Batch Processing Machine with Multiple Incompatible Job Families, Non-identical Job dimensions, Non-identical Job sizes, Non-agreeable release times and due dates

    International Nuclear Information System (INIS)

    Ramasubramaniam, M; Mathirajan, M

    2013-01-01

    The paper addresses the problem scheduling a batch processing machine with multiple incompatible job families, non-identical job dimensions, non-identical job sizes and non-agreeable release dates to minimize makespan. The research problem is solved by proposing a mixed integer programming model that appropriately takes into account the parameters considered in the problem. The proposed is validated using a numerical example. The experiment conducted show that the model can pose significant difficulties in solving the large scale instances. The paper concludes by giving the scope for future work and some alternative approaches one can use for solving these class of problems.

  16. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  17. To breathe or fight? Siamese fighting fish differ when facing a real opponent or mirror image.

    Science.gov (United States)

    Arnott, Gareth; Beattie, Emma; Elwood, Robert W

    2016-08-01

    Displays are a feature of animal contest behaviour and have been interpreted as a means of gathering information on opponent fighting ability, as well as signalling aggressive motivation. In fish, contest displays often include frontal and lateral elements, which in the latter involves contestants showing their flanks to an opponent. Previous work in a range of fish species has demonstrated population-level lateralization of these displays, preferentially showing one side to their opponent. Mirrors are commonly used in place of a real opponent to study aggression in fish, yet they may disrupt the normal pattern of display behaviour. Here, using Siamese fighting fish, Betta splendens, we compare the aggressive behaviour of males to a mirror image and real opponent behind a transparent barrier. As this species is a facultative air-breather, we also quantify surface breathing, providing insights into underlying fight motivation. Consistent with previous work, we found evidence of population-level lateralization, with a bias to present the left side and use the left eye when facing a real opponent. Contrary to expectations, there were no differences in the aggressive displays to a mirror and real opponent, with positive correlations between the behaviour in the two scenarios. However, there were important differences in surface breathing, which was more frequent and of longer duration in the mirror treatment. The reasons for these differences are discussed in relation to the repertoire of contest behaviour and motivation when facing a real opponent. Copyright © 2016 Elsevier B.V. All rights reserved.

  18. Adversaries, adherents and opponent of nuclear energy in the Slovak Republic

    International Nuclear Information System (INIS)

    Simunek, P.

    1998-01-01

    In this paper the author deals with the opinions on NPP, using of science by opponents as aid of the knowledge, with the opponents of variants of the development of the slovak energetic, with the public relations. New activities in the public relations are proposed

  19. Induction of depressed mood: a test of opponent-process theory.

    Science.gov (United States)

    Ranieri, D J; Zeiss, A M

    1984-12-01

    Solomon's (1980) opponent-process theory of acquired motivation has been used to explain many phenomena in which affective or hedonic contrasts appear to exist, but has not been applied to the induction of depressed mood. The purpose of this study, therefore, was to determine whether opponent-process theory can be applied to this area. Velten's (1968) mood-induction procedure was used and subjects were assigned either to a depression-induction condition or to one of two control groups. Self-report measures of depressed mood were taken before, during, and at several points after the mood induction. Results were not totally consistent with a rigorous set of criteria for supporting an opponent-process interpretation. This suggests that the opponent-process model may not be applicable to induced depressed mood. Possible weaknesses in the experimental design, along with implications for opponent-process theory, are discussed.

  20. Distinguishing the opponents promotes cooperation in well-mixed populations

    Science.gov (United States)

    Wardil, Lucas; da Silva, Jafferson K. L.

    2010-03-01

    Cooperation has been widely studied when an individual strategy is adopted against all coplayers. In this context, some extra mechanisms, such as punishment, reward, memory, and network reciprocity must be introduced in order to keep cooperators alive. Here, we adopt a different point of view. We study the adoption of different strategies against different opponents instead of adoption of the same strategy against all of them. In the context of the prisoner dilemma, we consider an evolutionary process in which strategies that provide more benefits are imitated and the players replace the strategy used in one of the interactions furnishing the worst payoff. Individuals are set in a well-mixed population, so that network reciprocity effect is excluded and both synchronous and asynchronous updates are analyzed. As a consequence of the replacement rule, we show that mutual cooperation is never destroyed and the initial fraction of mutual cooperation is a lower bound for the level of cooperation. We show by simulation and mean-field analysis that (i) cooperation dominates for synchronous update and (ii) only the initial mutual cooperation is maintained for asynchronous update. As a side effect of the replacement rule, an “implicit punishment” mechanism comes up in a way that exploitations are always neutralized providing evolutionary stability for cooperation.

  1. Location coding by opponent neural populations in the auditory cortex.

    Directory of Open Access Journals (Sweden)

    G Christopher Stecker

    2005-03-01

    Full Text Available Although the auditory cortex plays a necessary role in sound localization, physiological investigations in the cortex reveal inhomogeneous sampling of auditory space that is difficult to reconcile with localization behavior under the assumption of local spatial coding. Most neurons respond maximally to sounds located far to the left or right side, with few neurons tuned to the frontal midline. Paradoxically, psychophysical studies show optimal spatial acuity across the frontal midline. In this paper, we revisit the problem of inhomogeneous spatial sampling in three fields of cat auditory cortex. In each field, we confirm that neural responses tend to be greatest for lateral positions, but show the greatest modulation for near-midline source locations. Moreover, identification of source locations based on cortical responses shows sharp discrimination of left from right but relatively inaccurate discrimination of locations within each half of space. Motivated by these findings, we explore an opponent-process theory in which sound-source locations are represented by differences in the activity of two broadly tuned channels formed by contra- and ipsilaterally preferring neurons. Finally, we demonstrate a simple model, based on spike-count differences across cortical populations, that provides bias-free, level-invariant localization-and thus also a solution to the "binding problem" of associating spatial information with other nonspatial attributes of sounds.

  2. Challenging the other: exploring the role of opponent gender in digital game competition for female players.

    Science.gov (United States)

    Vermeulen, Lotte; Núñez Castellar, Elena; Van Looy, Jan

    2014-05-01

    Abstract The present study investigated the effect of opponent gender on the game experience of female players. Concretely, it looked into skill perception and player emotions of women in same gender and cross-gender game competition. We set up a 2×2×2 (male vs. female opponent×low vs. high competitive women×lost vs. won game) experimental design in which women were instructed to play against a proclaimed male and female competitor. Unknowingly, however, participants played against an AI, which was configured to produce a winning and a losing condition for each opponent by manipulating difficulty. Results indicated that opponent gender only had an effect on perceived stress, which was higher with male opponents. Moreover, players evaluated their own gaming skills as lower and the skills of presumed male opponents as higher when they thought they were playing against men. Importantly, our results also showed that the above described pattern for self-perceived skills and perceived opponent skills was modulated by trait competitiveness with a larger effect size for low competitive women. Overall, this study illustrates that gender dynamics affect the play experience of women in cross-gender gaming competition. Implications and suggestions for future research are discussed.

  3. Cortical Double-Opponent Cells in Color Perception: Perceptual Scaling and Chromatic Visual Evoked Potentials.

    Science.gov (United States)

    Nunez, Valerie; Shapley, Robert M; Gordon, James

    2018-01-01

    In the early visual cortex V1, there are currently only two known neural substrates for color perception: single-opponent and double-opponent cells. Our aim was to explore the relative contributions of these neurons to color perception. We measured the perceptual scaling of color saturation for equiluminant color checkerboard patterns (designed to stimulate double-opponent neurons preferentially) and uniformly colored squares (designed to stimulate only single-opponent neurons) at several cone contrasts. The spatially integrative responses of single-opponent neurons would produce the same response magnitude for checkerboards as for uniform squares of the same space-averaged cone contrast. However, perceived saturation of color checkerboards was higher than for the corresponding squares. The perceptual results therefore imply that double-opponent cells are involved in color perception of patterns. We also measured the chromatic visual evoked potential (cVEP) produced by the same stimuli; checkerboard cVEPs were much larger than those for corresponding squares, implying that double-opponent cells also contribute to the cVEP response. The total Fourier power of the cVEP grew sublinearly with cone contrast. However, the 6-Hz Fourier component's power grew linearly with contrast-like saturation perception. This may also indicate that cortical coding of color depends on response dynamics.

  4. Opponent-Color Fusion of Multi-Sensor Imagery: Visible, IR and SAR

    National Research Council Canada - National Science Library

    Waxman, A

    1998-01-01

    .... Building on the work reported in two of our earlier papers from IRIS Passive Sensors 1996, we show how opponent-color processing and center-surround shunting neural networks can be used to develop...

  5. Identifying and tracking switching, non-stationary opponents: a Bayesian approach

    CSIR Research Space (South Africa)

    Hernandez-Leal, P

    2016-02-01

    Full Text Available extend BPR to adversarial settings, in particular, to opponents that switch from one stationary strategy to another. Our proposed extension enables learning new models in an online fashion when the learning agent detects that the current policies...

  6. The behavior of an opponent alters pacing decisions in 4-km cycling time trials.

    Science.gov (United States)

    Konings, Marco J; Schoenmakers, Patrick P J M; Walker, Andrew J; Hettinga, Florentina J

    2016-05-01

    The present study aimed to explore how athletes respond to different behaviors of their opponents. Twelve moderately to highly physically active participants with at least two years of cycling experience completed four 4-km time trials on a Velotron cycle ergometer. After a familiarization time trial (FAM), participants performed three experimental time trials in randomized order with no opponent (NO), a virtual opponent who started slower and finished faster compared to FAM (OP-SLOWFAST), or a virtual opponent who started faster and finished slower compared to FAM (OP-FASTSLOW). Repeated-measures ANOVAs (Ppower output, velocity and RPE. OP-SLOWFAST and OP-FASTSLOW were completed faster compared to NO (385.5±27.5, 385.0±28.6, and 390.6±29.3s, respectively). An interaction effect for condition×distance (F=3.944, Ppower outputs by the participants in the initial 750m compared to a slower starting opponent. The present study is the first to show that the behavior of an opponent affects pacing-related decisions in laboratory-controlled conditions. Our findings support the recently proposed interdependence of perception and action, and emphasize the interaction with the environment as an important determinant for an athlete's pacing decisions, especially during the initial stages of a race. Copyright © 2016 Elsevier Inc. All rights reserved.

  7. The effect of opponent type on human performance in a three-alternative choice task.

    Science.gov (United States)

    Lie, Celia; Baxter, Jennifer; Alsop, Brent

    2013-10-01

    Adult participants played computerised games of "Paper Scissors Rock". Participants in one group were told that they were playing against the computer, and those in the other group were told that they were playing against another participant in the adjacent room. The participant who won the most games would receive a $50 prize. For both groups however, the opponent's responses (paper, scissors, or rock) were generated by the computer, and the distribution of these responses was varied across four blocks of 126 trials. Results were analysed using the generalised matching law for the three possible pairs of alternatives (paper vs. scissors, paper vs. rock, and scissors vs. rock) across all participants in each group. Overall, significantly higher estimates of sensitivity to the distribution of opponent's responses were obtained from participants who were told their opponent was a computer compared to participants who were told their opponent was another participant. While adding to the existing literature showing that the generalised matching law is an adequate descriptor of human three-alternative choice behaviour, these findings show that external factors such as perceived opponent type can affect the efficacy of reinforcer contingencies on human behaviour. This suggests that generalising the results from tasks performed against a computer to real-life human-to-human interactions warrants some caution. Copyright © 2013 Elsevier B.V. All rights reserved.

  8. Designing an advanced available-to-promise mechanism compatible with the make-to-forecast production systems through integrating inventory allocation and job shop scheduling with due dates and weighted earliness/tardiness cost

    Directory of Open Access Journals (Sweden)

    Masoud Rabbani

    2016-06-01

    Full Text Available In the competitive business world, applying a reliable and powerful mechanism to support decision makers in manufacturing companies and helping them save time by considering varieties of effective factors is an inevitable issue. Advanced Available-to-Promise is a perfect tool to design and perform such a mechanism. In this study, this mechanism which is compatible with the Make-to-Forecast production systems is presented. The ability to distinguish between batch mode and real-time mode advanced available-to-promise is one of the unique superiorities of the proposed model. We also try to strengthen this mechanism by integrating the inventory allocation and job shop scheduling by considering due dates and weighted earliness/tardiness cost that leads to more precise decisions. A mixed integer programming (MIP model and a heuristic algorithm according to its disability to solve large size problems are presented. The designed experiments and the obtained results have proved the efficiency of the proposed heuristic method.

  9. A Model of Batch Scheduling for a Single Batch Processor with Additional Setups to Minimize Total Inventory Holding Cost of Parts of a Single Item Requested at Multi-due-date

    Science.gov (United States)

    Hakim Halim, Abdul; Ernawati; Hidayat, Nita P. A.

    2018-03-01

    This paper deals with a model of batch scheduling for a single batch processor on which a number of parts of a single items are to be processed. The process needs two kinds of setups, i. e., main setups required before processing any batches, and additional setups required repeatedly after the batch processor completes a certain number of batches. The parts to be processed arrive at the shop floor at the times coinciding with their respective starting times of processing, and the completed parts are to be delivered at multiple due dates. The objective adopted for the model is that of minimizing total inventory holding cost consisting of holding cost per unit time for a part in completed batches, and that in in-process batches. The formulation of total inventory holding cost is derived from the so-called actual flow time defined as the interval between arrival times of parts at the production line and delivery times of the completed parts. The actual flow time satisfies not only minimum inventory but also arrival and delivery just in times. An algorithm to solve the model is proposed and a numerical example is shown.

  10. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  11. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  12. Dating Violence

    Science.gov (United States)

    ... for Teens / Dating Violence Bulletins for Teens: Dating Violence What is it? If you are a victim ... often. If You Are a Victim of Dating Violence, You Might… Think it's your fault. Feel angry, ...

  13. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  14. Racing an Opponent Alters Pacing, Performance and Muscle Force Decline, But Not RPE

    NARCIS (Netherlands)

    Konings, Marco J; Parkinson, Jordan; Zijdewind, Inge; Hettinga, Florentina

    PURPOSE: Performing against a virtual opponent has been shown to invite a change in pacing and improve time trial (TT) performance. This study explored how this performance improvement is established by assessing changes in pacing, neuromuscular function and perceived exertion. METHODS: After a peak

  15. Memory of opponents is more potent than visual sign stimuli after social hierarchy has been established

    DEFF Research Database (Denmark)

    Korzan, W.J.; Höglund, Erik; Watt, M.J.

    2007-01-01

    During agonistic interactions between male Anolis carolinensis, perception of a visual sign stimulus (darkened eyespots) not only inhibits aggression and promotes initial attainment of dominant social status, but also evokes distinct neuroendocrine responses in each opponent. This study was desig......During agonistic interactions between male Anolis carolinensis, perception of a visual sign stimulus (darkened eyespots) not only inhibits aggression and promotes initial attainment of dominant social status, but also evokes distinct neuroendocrine responses in each opponent. This study...... was designed to examine the effect of eyespot manipulation on behavior and social rank during a second interaction between opponents that had previously established a natural dyadic social hierarchy. Prior to a second interaction, eyespots of familiar size-matched combatants were manipulated to reverse...... information conveyed by this visual signal. Eyespots on the previously dominant male were masked with green paint to indicate low aggression and social status. Previously subordinate males had their eyespots permanently marked with black paint to convey high aggression and status. Opponents were then re...

  16. Learning from induced changes in opponent (re)actions in multi-agent games

    NARCIS (Netherlands)

    P.J. 't Hoen (Pieter Jan); S.M. Bohte (Sander); J.A. La Poutré (Han)

    2005-01-01

    textabstractMulti-agent learning is a growing area of research. An important topic is to formulate how an agent can learn a good policy in the face of adaptive, competitive opponents. Most research has focused on extensions of single agent learning techniques originally designed for agents in more

  17. oRGB: a practical opponent color space for computer graphics.

    Science.gov (United States)

    Bratkova, Margarita; Boulos, Solomon; Shirley, Peter

    2009-01-01

    Designed for computer graphics, oRGB is a new color model based on opponent color theory. It works well for both HSV-style color selection and computational applications such as color transfer. oRGB also enables new applications such as a quantitative cool-to-warm metric, intuitive color manipulation and variations, and simple gamut mapping.

  18. Video Game Violence and the Female Game Player: Self- and Opponent Gender Effects on Presence and Aggressive Thoughts

    Science.gov (United States)

    Eastin, Matthew S.

    2006-01-01

    Adding depth and breadth to the general aggression model, this paper presents three experiments that test the relationships among user and opponent gender representation, opponent type, presence, and aggressive thoughts from violent video game play. Studies 1 and 2 suggest that females experience greater presence and more aggressive thoughts from…

  19. Analyzing NPS Scheduling Using OSIRIS

    Science.gov (United States)

    1993-03-01

    School TEACHER SCHEDULE BLOCKS REPORT Date: 2/19/93 Period Name ID Term Days 1234 Adragna , Joe 170401 1 F xx Agrawal, Brij 120101 1 F xx Almquist...LOAD REPORT Date: 3/18/93 Total Max Consec Total Teacher ID Term Classes Classes Stud Adragna , Joe 170401 1 1 1 3 Agrawal, Brij 120101 1 2 2 98 Aiello

  20. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  1. Understanding response patterns in dyadic conflict: An interactive approach combining self-construal and opponent's dominance-submissiveness.

    Science.gov (United States)

    Au, Al K C; Lam, Shui-Fong

    2017-04-01

    Previous works on the effect of self-construal in interpersonal behaviours tend to adopt a main effect approach. The present research proposes an interactive approach in understanding two response patterns in dyadic conflict by combining self-construal and the stance of the opponent. Independent self-construal was hypothesised to be associated with a self-centred pattern of conflict response, which is characterised by taking contending responses regardless of whether the stance of the opponent is dominant or submissive. Relational self-construal was hypothesised to be associated with a tuning-in pattern of conflict response, which is characterised by showing contending responses when the opponent is submissive but yielding responses when the opponent is dominant. With trait self-construal measured and opponent's stance manipulated, Study 1 provided initial support for the hypotheses. Study 2 showed a three-way interaction effect between trait self-construal, manipulated self-construal and the opponent's stance on actual conflict responses during discussion of a scenario. The effect of self-construal manipulation was only observed among people who were low in trait independent self-construal and average in trait relational self-construal. The results pinpoint the importance of considering personal and opponent factors simultaneously in understanding the dynamics of dyadic conflict processes. © 2015 International Union of Psychological Science.

  2. Hydroelectricity and ecological considerations. Falsification of the environmental reality by the opponents of hydropower

    Directory of Open Access Journals (Sweden)

    Andrzej Giziński

    2013-09-01

    Full Text Available Opponents of hydroelectricity claim falsely that hydrotechnical development of the Lower Vistula River constitutes implementation of Edward Gierek’s concept of bringing only environmental damage1. Statements on the negative environmental impact of constructing small hydroelectric power stations (SHPS are equally groundless. Permanent protests against the construction of dams and river damming, regardless of the motivations and will of protesters, increase energy dependence on Russia, and preserves the poor, post-Bierut hydrological situation2. The main fallacy made by hydropower opponents is the alternative treatment of power and environmental purposes. Environmental errors consist in continuous omission of even the most obvious positive ecological effects of constructing river dams and – what is especially reprehensible – inventing non-existent threats, e.g. lethal concentration of toxic heavy metals in deposits of the Włocławek Reservoir or the detrimental impact of warming up water in stage of falls on the fish population below the dam.

  3. Dating Violence

    Science.gov (United States)

    Stader, David L.

    2011-01-01

    Dating violence is a form of student-on-student victimization and is a serious school safety issue. Research indicates that at a minimum, 10 percent of high school students are victims of dating violence in one form or another. Among female high school students that date, some data indicate that as many as 30 percent may be victims of dating…

  4. Dealing with opponents of industry: Let the allies work for you

    International Nuclear Information System (INIS)

    Duncan, Colin

    1998-01-01

    Full text: The opponents of industry, and most Green campaigning groups, thrive on controversy. Opponents of industry, and of the nuclear industry in particular, can expect to find a more receptive public audience than do the companies they attack. Therefore, there is little to be gained by industry entering into direct conflict, or even high-profile debate, with opponents. Industry spokesmen do not rate as being trustworthy in the eyes of the public. And it does not pay to directly attack the credibility, however justified such criticisms are, of the likes of Greenpeace. In a polarised debate, if your company is seen to be partisan and the opponents to be neutral, the public will gravitate towards the opponents. The way forward is to influence the forces which ran help industry establish the middle ground to dissipate the tension. The problem for industry is not so much that it has opponents, but that it does not have enough third party advocates to mediate in disputes. Therefore, the first step is to identify the key issues facing a company or industry. The second, is to work with credible people and organisations to establish independent mechanisms which can prevent an unfavourable climate building up around those issues. The art of dealing with opponents, is the art of identifying such mechanisms (people, organisations and professions) to influence an increasingly cynical and distrusting public. These opinion-formers should be the main focus of a communications strategy designed to counter opponents. They are the conduit through which to influence public opinion in general. For instance, the debate surrounding the incidence of leukaemia around nuclear sites cannot be answered by the industry using the facts, scientific evidence, or by entering into a noisy dialogue with opponents. However, the medical profession, along with scientists working outside the nuclear industry, is in a position to shift public concern away from nuclear sites. BNFL has promoted

  5. Opponent Coding of Sound Location (Azimuth) in Planum Temporale is Robust to Sound-Level Variations.

    Science.gov (United States)

    Derey, Kiki; Valente, Giancarlo; de Gelder, Beatrice; Formisano, Elia

    2016-01-01

    Coding of sound location in auditory cortex (AC) is only partially understood. Recent electrophysiological research suggests that neurons in mammalian auditory cortex are characterized by broad spatial tuning and a preference for the contralateral hemifield, that is, a nonuniform sampling of sound azimuth. Additionally, spatial selectivity decreases with increasing sound intensity. To accommodate these findings, it has been proposed that sound location is encoded by the integrated activity of neuronal populations with opposite hemifield tuning ("opponent channel model"). In this study, we investigated the validity of such a model in human AC with functional magnetic resonance imaging (fMRI) and a phase-encoding paradigm employing binaural stimuli recorded individually for each participant. In all subjects, we observed preferential fMRI responses to contralateral azimuth positions. Additionally, in most AC locations, spatial tuning was broad and not level invariant. We derived an opponent channel model of the fMRI responses by subtracting the activity of contralaterally tuned regions in bilateral planum temporale. This resulted in accurate decoding of sound azimuth location, which was unaffected by changes in sound level. Our data thus support opponent channel coding as a neural mechanism for representing acoustic azimuth in human AC. © The Author 2015. Published by Oxford University Press.

  6. The coupling between gaze behavior and opponent kinematics during anticipation of badminton shots.

    Science.gov (United States)

    Alder, David; Ford, Paul R; Causer, Joe; Williams, A Mark

    2014-10-01

    We examined links between the kinematics of an opponent's actions and the visual search behaviors of badminton players responding to those actions. A kinematic analysis of international standard badminton players (n = 4) was undertaken as they completed a range of serves. Video of these players serving was used to create a life-size temporal occlusion test to measure anticipation responses. Expert (n = 8) and novice (n = 8) badminton players anticipated serve location while wearing an eye movement registration system. During the execution phase of the opponent's movement, the kinematic analysis showed between-shot differences in distance traveled and peak acceleration at the shoulder, elbow, wrist and racket. Experts were more accurate at responding to the serves compared to novice players. Expert players fixated on the kinematic locations that were most discriminating between serve types more frequently and for a longer duration compared to novice players. Moreover, players were generally more accurate at responding to serves when they fixated vision upon the discriminating arm and racket kinematics. Findings extend previous literature by providing empirical evidence that expert athletes' visual search behaviors and anticipatory responses are inextricably linked to the opponent action being observed. Copyright © 2014 Elsevier B.V. All rights reserved.

  7. Luminescence dating

    International Nuclear Information System (INIS)

    Rieser, U.

    2009-01-01

    The luminescence techniques have evolved over the last 40 years to a powerful dating instrument in archaeology and geoscience. Depending on how the luminescence is stimulated, one distinguishes the phenomena of thermoluminescence (TL), optically stimulated luminescence (OSL) and infrared stimulated luminescence (IRSL). Each of these phenomena has its specific potential for dating various archaeological materals in the time range from medieval back to palaeolithic periods, or, speaking in geological terms, for dating of Holocene and late Pleistocene objects. The OSL and IRSL techniques are sometimes treated together as 'optical dating'. The luminescence techniques differ from other major dating techniques, such as 14 C, essentially by their applicability to inorganic materials, their wide age-range from about 100 years to more than 100,000 years and the kind of datable events which are the last exposure to heat or to light. (author). 10 refs., 3 figs.

  8. Luminescence dating

    International Nuclear Information System (INIS)

    Rieser, U.

    2008-01-01

    The luminescence techniques have evolved over the last 40 years to a powerful dating instrument in archaeology and geoscience. Depending on how the luminescence is stimulated, one distinguishes the phenomena of thermoluminescence (TL), optically stimulated luminescence (OSL) and infrared stimulated luminescence (IRSL). Each of these phenomena has its specific potential for dating various archaeological materals in the time range from medieval back to palaeolithic periods, or, speaking in geological terms, for dating of Holocene and late Pleistocene objects. The OSL and IRSL techniques are sometimes treated together as 'optical dating'. The luminescence techniques differ from other major dating techniques, such as 14 C, essentially by their applicability to inorganic materials, their wide age-range from about 100 years to more than 100,000 years and the kind of datable events which are the last exposure to heat or to light. (author). 10 refs., 3 figs

  9. Luminescence dating

    International Nuclear Information System (INIS)

    Rieser, U.

    2012-01-01

    The luminescence techniques have evolved over the last 40 years to a powerful dating instrument in archaeology and geoscience. Depending on how the luminescence is stimulated, one distinguishes the phenomena of thermoluminescence (TL), optically stimulated luminescence (OSL) and infrared stimulated luminescence (IRSL). Each of these phenomena has its specific potential for dating various archaeological materials in the time range from medieval back to palaeolithic periods, or, speaking in geological terms, for dating of Holocene and late Pleistocene objects. The OSL and IRSL techniques are sometimes treated together as 'optical dating'. The luminescence techniques differ from other major dating techniques, such as 14 C, essentially by their applicability to inorganic materials, their wide age-range from about 100 years to more than 100,000 years and the kind of datable events which are the last exposure to heat or to light. (author). 10 refs., 3 figs.

  10. Luminescence dating

    International Nuclear Information System (INIS)

    Rieser, U.

    2009-01-01

    The luminescence techniques have evolved over the last 40 years to a powerful dating instrument in archaeology and geoscience. Depending on how the luminescence is stimulated, one distinguishes the phenomena of thermoluminescence (TL), optically stimulated luminescence (OSL) and infrared stimulated luminescence (IRSL). Each of these phenomena has its specific potential for dating various archaeological materals in the time range from medieval back to palaeolithic periods, or, speaking in geological terms, for dating of Holocene and late Pleistocene objects. The OSL and IRSL techniques are sometimes treated together as 'optical dating'. The luminescence techniques differ from other major dating techniques, such as 14 C, essentially by their applicability to inorganic materials, their wide age-range from about 100 years to more than 100,000 years and the kind of datable events which are the last exposure to heat or to light. (author). 10 refs., 3 figs

  11. Luminescence dating

    International Nuclear Information System (INIS)

    Rieser, U.

    2013-01-01

    The luminescence techniques have evolved over the last 40 years to a powerful dating instrument in archaeology and geoscience. Depending on how the luminescence is stimulated, one distinguishes the phenomena of thermoluminescence (TL), optically stimulated luminescence (OSL) and infrared stimulated luminescence (IRSL). Each of these phenomena has its specific potential for dating various archaeological materials in the time range from medieval back to palaeolithic periods, or, speaking in geological terms, for dating of Holocene and late Pleistocene objects. The OSL and IRSL techniques are sometimes treated together as 'optical dating'. The luminescence techniques differ from other major dating techniques, such as 14 C, essentially by their applicability to inorganic materials, their wide age-range from about 100 years to more than 100,000 years and the kind of datable events which are the last exposure to heat or to light. (author). 10 refs., 3 figs.

  12. Offshore wind power in Sweden—A qualitative analysis of attitudes with particular focus on opponents

    International Nuclear Information System (INIS)

    Waldo, Åsa

    2012-01-01

    The Swedish Parliament has voted for massive expansion of wind power within the next decade. As in many other countries, the establishment of new wind farms has aroused local opposition. This paper contributes to the literature using a qualitative methodology to analyse attitudes towards wind power. In 2007, we carried out in-depth interviews with 40 stakeholders concerned with two planned near-shore farms in Sweden; despite their location, the wind farms' visual impact provoked strong negative attitudes. However, we found no evidence of the NIMBY-syndrome; rather, those opposing the wind farms question wind power more generally, especially vis-à-vis nuclear power. The analysis of attitudes is based on three components: cognition, feeling and action tendency. The results show high consistency between the feeling and cognitive components of attitudes: a negative feeling regarding landscape impact, for example, is accompanied by a belief that wind power is inefficient and unprofitable. However, in many cases the action tendency component is in dissonance with the other two: opponents remain passive despite being against the establishment of new wind farms. These passive opponents represent elements of uncertainty as they may suddenly, at a late stage, turn into active opponents exerting an effect on the decision process. - Highlights: ► Opposition to near-shore wind farms expressed in in-depth interviews is analysed. ► Wind power is viewed as a threat to landscape qualities regardless of proximity. ► Inefficiency and unprofitability are reasons to question wind power establishments. ► Passive opposition is an element of uncertainty that may turn into active opposition. ► Understanding of local response must rest on level of support as well as activity.

  13. The eschatological opponent of Daniel and the Antichrist of the Syriac Apocalypse of Daniel

    Directory of Open Access Journals (Sweden)

    Sara Daiane Silva José

    2014-12-01

    Full Text Available The Syriac Apocalypse of Daniel (Syr Apoc Dan, a Christian apocalypse from the seventh century of Common Era, is clearly tributary to the canonical book of Daniel (Dn. In its turn, Dn provided the figure of an eschatological opponent who was re-signified in Christianity: the Antichrist. The cosmic dimensions of the malevolent character of oppressive tyrant of Dn – his arrogance against the gods, the abomination of desolation, military conquests and persecutions of the saints, the change of the cosmic order, the time of the reign and death of the tyrant – are considered in this work compared with the Antichrist of the Syr Apoc Dan.

  14. Dominant and opponent relations in cortical function: An EEG study of exam performance and stress

    Directory of Open Access Journals (Sweden)

    Lucia P. Pavlova

    2017-12-01

    Full Text Available This paper analyzes the opponent dynamics of human motivational and affective processes, as conceptualized by RS Solomon, from the position of AA Ukhtomsky’s neurophysiological principle of the dominant and its applications in the field of human electroencephalographic analysis. As an experimental model, we investigate the dynamics of cortical activity in students submitting university final course oral examinations in naturalistic settings, and show that successful performance in these settings depends on the presence of specific types of cortical activation patterns, involving high indices of left-hemispheric and frontal cortical dominance, whereas the lack thereof predicts poor performance on the task, and seems to be associated with difficulties in the executive regulation of cognitive (intellectual and motivational processes in these highly demanding and stressful conditions. Based on such knowledge, improved educational and therapeutic interventions can be suggested which take into account individual variability in the neurocognitive mechanisms underlying adaptation to motivationally and intellectually challenging, stressful tasks, such as oral university exams. Some implications of this research for opponent-process theory and its closer integration into current neuroscience research on acquired motivations are discussed.

  15. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  16. Radiometric dating

    International Nuclear Information System (INIS)

    Das, N.R.

    2017-01-01

    Since the discovery of natural radioactivity in uranium, in the last decade of the nineteenth century, the nuclear property of radioactive decay of radionuclides at immutable rates has been effectively utilized in dating of varieties of naturally occurring geological matrices and the organisms which constantly replenish their "1"4C supply through respiration when alive on earth. During the period, applications of radiometric dating techniques have been extensively diversified and have enabled the geologists to indicate the absolute time scales of geological formations and the evolution of the solar system, the earth, meteorites, lunar rocks, etc. and the archaeologists to record the facts of history of several important events like dinosaur era, Iceman, the Shroud in Turin and many other ancient artefacts. In the development of dating methods, varieties of naturally occurring radio-isotopic systems with favorable half-lives ranging from about 10 years to over 100 billion years have been used as radiometric clocks. (author)

  17. 5 CFR 950.801 - Campaign schedule.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Campaign schedule. 950.801 Section 950... VOLUNTARY ORGANIZATIONS CFC Timetable § 950.801 Campaign schedule. (a) The Combined Federal Campaign will be.../International and International parts of the Charity List to all local campaigns by a date to be determined by...

  18. The Science of Racing against Opponents: Affordance Competition and the Regulation of Exercise Intensity in Head-to-Head Competition.

    Science.gov (United States)

    Hettinga, Florentina J; Konings, Marco J; Pepping, Gert-Jan

    2017-01-01

    Athlete-environment interactions are crucial factors in understanding the regulation of exercise intensity in head-to-head competitions. Previously, we have proposed a framework based on the interdependence of perception and action, which allows us to explore athletic behavior in the more complex pacing situations occurring when athletes need to respond to actions of their opponents. In the present perspective we will further explore whether opponents, crucial external factors in competitive sports, could indeed be perceived as social invitations for action. Decisions regarding how to expend energy over the race are based on internal factors such as the physiological/biomechanical capacity of the athlete in relation to external factors such as those presented by opponents. For example: Is the athlete able to overtake competitors, or not? We present several experimental studies that demonstrate that athletes regulate their exercise intensity differently in head-to-head competition compared to time-trial exercises: Relational athlete-environment aspects seem to outweigh benefits of the individual optimal energy distribution. Also, the behavior of the opponents has been shown to influence pacing strategies of competing athletes, again demonstrating the importance of relational athlete-environment aspects in addition to strictly internal factors. An ecological perspective is presented in which opponents are proposed to present social affordances, and decision-making is conceptualized as a resultant of affordance-competition. This approach will provide novel insights in tactical decision-making and pacing behavior in head-to-head competitions. Future research should not only focus on the athlete's internal state, but also try to understand opponents in the context of the social affordances they provide.

  19. Opponent appetitive-aversive neural processes underlie predictive learning of pain relief.

    Science.gov (United States)

    Seymour, Ben; O'Doherty, John P; Koltzenburg, Martin; Wiech, Katja; Frackowiak, Richard; Friston, Karl; Dolan, Raymond

    2005-09-01

    Termination of a painful or unpleasant event can be rewarding. However, whether the brain treats relief in a similar way as it treats natural reward is unclear, and the neural processes that underlie its representation as a motivational goal remain poorly understood. We used fMRI (functional magnetic resonance imaging) to investigate how humans learn to generate expectations of pain relief. Using a pavlovian conditioning procedure, we show that subjects experiencing prolonged experimentally induced pain can be conditioned to predict pain relief. This proceeds in a manner consistent with contemporary reward-learning theory (average reward/loss reinforcement learning), reflected by neural activity in the amygdala and midbrain. Furthermore, these reward-like learning signals are mirrored by opposite aversion-like signals in lateral orbitofrontal cortex and anterior cingulate cortex. This dual coding has parallels to 'opponent process' theories in psychology and promotes a formal account of prediction and expectation during pain.

  20. Recent experiments testing an opponent-process theory of acquired motivation.

    Science.gov (United States)

    Solomon, R L

    1980-01-01

    There are acquired motives of the addiction type which seem to be non-associative in nature. They all seem to involve affective phenomena caused by reinforcers, unconditioned stimuli or innate releasers. When such stimuli are repeatedly presented, at least three affective phenomena occur: (1) affective contrast effects, (2) affective habituation (tolerance), and (3) affective withdrawal syndromes. These phenomena can be precipitated either by pleasant or unpleasant events (positive or negative reinforcers). Whenever we see these three phenomena, we also see the development of an addictive cycle, a new motivational system. These phenomena are explained by an opponent-process theory of motivation which holds that there are affect control systems which oppose large departures from affective equilibrium. The control systems are strengthened by use and weakened by disuse. Current observations and experiments testing the theory are described for: (1) the growth of social attachment (imprinting) in ducklings; and (2) the growth of adjunctive behaviors. The findings so far support the theory.

  1. Communication, opponents, and clan performance in online games: a social network approach.

    Science.gov (United States)

    Lee, Hong Joo; Choi, Jaewon; Kim, Jong Woo; Park, Sung Joo; Gloor, Peter

    2013-12-01

    Online gamers form clans voluntarily to play together and to discuss their real and virtual lives. Although these clans have diverse goals, they seek to increase their rank in the game community by winning more battles. Communications among clan members and battles with other clans may influence the performance of a clan. In this study, we compared the effects of communication structure inside a clan, and battle networks among clans, with the performance of the clans. We collected battle histories, posts, and comments on clan pages from a Korean online game, and measured social network indices for communication and battle networks. Communication structures in terms of density and group degree centralization index had no significant association with clan performance. However, the centrality of clans in the battle network was positively related to the performance of the clan. If a clan had many battle opponents, the performance of the clan improved.

  2. Radiocarbon dating

    International Nuclear Information System (INIS)

    Lazos R, L.

    2005-01-01

    The application of the radiocarbon dating in archaeology has not served only to solve problems related with the establishment of chronologies, but also in the development of archaeological methods of excavation and interpretation. This has been possible because the dating method by radiocarbon provides a common temporary scale that transcends the cultural and regional frontiers. It is even spoken of the revolution that has meant the fact that the application of this method has allowed to the archaeologist to pass from the construction of chronologies until the evaluation and dynamic interpretation of the archaeological data to build theories. This work explains and compares methods for the detection of 14 C, as the gas counting, the liquid scintillation counting and the mass spectrometry with accelerators. (Author)

  3. Thermoluminescence dating

    International Nuclear Information System (INIS)

    Price, D.M.

    1999-01-01

    Thermoluminescence (TL) dating of sediments depends upon the acquisition and long term stable storage of TL energy by crystalline minerals contained within a sedimentary unit. This energy is stored in the form of trapped electrons and quartz sand is the most commonly used mineral employed in the dating process. Prior to the final depositional episode it is necessary that any previously acquired TL is removed by exposure to sunlight. After burial the TL begins to build up again at a rate dependent upon the radiation flux delivered by long-lived isotopes of uranium, thorium and potassium. The presence of rubidium and cosmic radiation generally play a lesser but contributory roll, and the total radiation dose delivered to the TL phosphor is modified by the presence of water. The period since deposition is therefore measured by determining the total amount of stored TL energy, the palaeodose (P), and the rate at which this energy is acquired, the annual radiation dose (ARD). TL dating may be applied to eolian, fluvial, coastal and in some cases, marine sediments. the technique is also successfully applied to volcanic materials and to a certain extent to archeological specimens

  4. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  5. A test of the opponent-process theory of motivation using lesions that selectively block morphine reward.

    Science.gov (United States)

    Vargas-Perez, Hector; Ting-A-Kee, Ryan A; Heinmiller, Andrew; Sturgess, Jessica E; van der Kooy, Derek

    2007-06-01

    The opponent-process theory of motivation postulates that motivational stimuli activate a rewarding process that is followed by an opposed aversive process in a homeostatic control mechanism. Thus, an acute injection of morphine in nondependent animals should evoke an acute rewarding response, followed by a later aversive response. Indeed, the tegmental pedunculopontine nucleus (TPP) mediates the rewarding effects of opiates in previously morphine-naive animals, but not other unconditioned effects of opiates, or learning ability. The aversive opponent process for acute morphine reward was revealed using a place-conditioning paradigm. The conditioned place aversion induced by 16-h spontaneous morphine withdrawal from an acute morphine injection in nondependent rats was abolished by TPP lesions performed prior to drug experience. However, TPP-lesioned rats did show conditioned aversions for an environment paired with the acute administration of the opioid antagonist naloxone, which blocks endogenous opioids. The results show that blocking the rewarding effects of morphine with TPP lesions also blocked the opponent aversive effects of acute morphine withdrawal in nondependent animals. Thus, this spontaneous withdrawal aversion (the opponent process) is induced by the acute rewarding effects of morphine and not by other unconditioned effects of morphine, the pharmacological effects of morphine or endogenous opioids being displaced from opiate receptors.

  6. A Neural Model of Chromatic Induction in Uniform and Textured Images and Psychophysical Detection of Non-Opponent Chromatic Qualia

    Science.gov (United States)

    Livitz, Gennady

    2011-01-01

    Color is a complex and rich perceptual phenomenon that relates physical properties of light to certain perceptual qualia associated with vision. Hering's opponent color theory, widely regarded as capturing the most fundamental aspects of color phenomenology, suggests that certain unique hues are mutually exclusive as components of a single color.…

  7. Reinforcement Learning in the Game of Othello: Learning Against a Fixed Opponent and Learning from Self-Play

    NARCIS (Netherlands)

    van der Ree, Michiel; Wiering, Marco

    2013-01-01

    This paper compares three strategies in using reinforcement learning algorithms to let an artificial agent learnto play the game of Othello. The three strategies that are compared are: Learning by self-play, learning from playing against a fixed opponent, and learning from playing against a fixed

  8. Expectancy effects in tennis: the impact of opponents' pre-match non-verbal behaviour on male tennis players.

    Science.gov (United States)

    Buscombe, Richard; Greenlees, Iain; Holder, Tim; Thelwell, Richard; Rimmer, Matt

    2006-12-01

    In this study, we examined the impact of a male opponent's pre-match body language and clothing (general vs. sports-specific) on how his performances were judged by an observer. Forty male tennis players viewed videos of a male target tennis player warming up and then observed playing footage of the target. Each participant viewed the target player warming up displaying one of four combinations of body language and clothing (positive body language/tennis-specific clothing; positive body language/general sportswear; negative body language/tennis-specific clothing; negative body language/general sportswear). Participants rated the performance of the tennis player and gave their perceptions of the likely outcome of a tennis match with the target player. Analyses of variance indicated that clothing and body language had an interactive effect on both outcome expectations and ratings of performance. The findings support the contention that the initial impressions athletes form of their opponents can influence the way in which they judge the performances of opponents and their perceived likelihood of success against the same opponents.

  9. Response saturation of monochromatic increments on intense achromatic backgrounds: implications for color-opponent organization in human vision

    Science.gov (United States)

    Drum, Bruce; Sternheim, Charles E.

    2005-10-01

    We present evidence that steady achromatic adapting fields can produce response saturation in color-opponent pathways. We measured tvi (log increment threshold illuminance versus log background illuminance) functions at four test wavelengths (430, 490, 575, and 660 nm) and nine background illuminances from 4.0 to 5.6 log Td. Foveal, 2° diameter, 1 s duration test stimuli were presented on a concentric, perceptually white (5128°K color temperature), 7° diameter, steady background. Thresholds were obtained by the method of adjustment, after which the test stimulus illuminances were increased 0.6 log unit and the subject estimated percentages of red, yellow, green, blue, and white. Average tvi slopes for two subjects were 2.06 for 430 nm, 1.6 for 490 nm, 1.11 for 575 nm and 1.34 for 660 nm, consistent with the estimated ratios of chromatic to achromatic sensitivity at the same wavelengths. Also, the percentage of white seen in the suprathreshold increments increased with increasing background illuminance despite increases in excitation purity. These findings imply that steady, intense, achromatic backgrounds can produce response saturation in color-opponent mechanisms at wavelengths across the visible spectrum. The saturation was more extreme at short wavelengths than at middle or long wavelengths, producing a tritanopic condition at the highest background illuminances. The tritanopia reduced color space to a predominately red-blue dichromacy, in agreement with previous findings. The results support a multistage opponent-color model in which precortical koniocellular and parvocellular opponent pathways interact to produce the observed red-green and yellow-blue color-opponent channels at a cortical level.

  10. The motivation to breastfeed: a fit to the opponent-process theory?

    Science.gov (United States)

    Myers, H H; Siegel, P S

    1985-07-01

    The opponent-process theory, a dynamic model of acquired motivation presented by Solomon and Corbit (1974), was applied to the process of breastfeeding. A modified form of the Nowlis Mood Adjective Checklist (MACL, Nowlis, 1965, 1970) and a discomfort measure were used in assessing through recall the affective course predicted by the theory. The data were analyzed using multivariate analysis of variance (MANOVA) and correlational procedures. Results were highly significant: Women who breastfed for relatively long periods recalled positive affective responses while the baby was at breast and a subsequent negative or dysphoric response. The additional characteristics of acquired motivation, habituation, and withdrawal, were also evidenced in the data. As a control for possible confounding demand characteristics inherent in the methodology, a sample of childless women was surveyed using an "as-if" form of the same questionnaire. Very little similarity to the breastfeeders was found in the pattern of responses yielded by this group. It was concluded that our major findings are quite likely free of influence from this source.

  11. Eggs and Abortion: "Women-Protective" Language Used by Opponents in Legislative Debates over Reproductive Health.

    Science.gov (United States)

    Jesudason, Sujatha; Weitz, Tracy

    2015-01-01

    In this paper we undertake an examination of the presence of similar "women-protective" discourses in policy debates occurring over two bills on reproductive-related topics considered during the 2013 California legislature session. The first bill (AB154), now signed into law, allows nurse practitioners, certified nurse midwives, and physician assistants to perform first-trimester aspiration abortions. The second bill (AB926), had it passed, would remove the prohibition on paying women for providing eggs to be used for research purposes. Using frame analysis we find evidence of similar protective arguments by opponents of both bills, although these advocates do not share ideological positions on abortion rights or women's autonomy. In the case of AB154, anti-abortion advocates use language and frames that call for protecting the health of women against the imputed interests of the "abortion industry." In the case of AB926, feminists and pro-choice advocates evoke similar frameworks for the protection of women against the interests of the "medical research industry." Both sides argue for the "protection of women," from opposing positions on the rights and autonomy of women in relationship to reproductive freedom. © 2015 American Society of Law, Medicine & Ethics, Inc.

  12. The complexity behind the date

    CERN Multimedia

    2009-01-01

    For the waiting world, and indeed for most of us here at CERN, ‘the LHC schedule’ simply means the date that the LHC will restart - and we only take notice when that end-date changes. But in fact the schedule is a constantly evolving intricate document coordinating all the repairs, consolidation and commissioning in every part of the machine. So, what actually goes on behind the scenes in timing and planning all the work on one of the most complex scientific instruments ever built?

  13. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    month; the necessary rate of a month; the quantities to be completed before half period of the project; the quantities to be achieved before the cold function test. Due to a lot of documents and equipment in LANP, it is impossible to present their supply dates one by one in the level 2 project schedule. The rules, in reference to the corresponding construction starting dates, were given to define the supply dates. The good practices of construction schedule control are presented, including draft of a construction program, performance evaluation, specific coordination meeting and Work Load Point application. The schedule control culture is described, that is one core, two criteria, three control mechanisms, four resources to be secured. (author)

  14. Psychiatry and Religion: Opponents or Collaborators? The Power of Spirituality in Contemporary Psychiatry.

    Science.gov (United States)

    Jakovljević, Miro

    2017-04-01

    Religion and psychiatry have had complicated, sometimes neutral or friendly and cooperative, sometimes competitive and antagonistic relations over their long histories. Relations between psychiatry and religion are influenced by complex belief systems, each diverse and changing. Psychiatry has often ignored spiritual and religious dimension in health and illness while religions influenced the treatment of mental disorders directly by defining mental disorders as evil spirit possessions and prescribing exorcism as treatment. It has been a long way to prevail looking for natural over supra-natural explanations for mental disorders. Psychiatry and religion as social practices should be regarded as allies against pseudoscientific nonsense and superstitions. This alliance is based on the next evidence: 1. religious and spiritual well-being is an important component of mental health as well as of health in general; 2. research and empirical evidence reveals that healthy-minded and distorted or sick faith are quite distinct in the effects in the lives of the faithful; 3. psychiatrists are professionally expected to always respect and be sensitive to the spiritual and religious beliefs and practices of their patients; 4. religious and spiritual beliefs and practice is very important aspect of person-centered psychiatry. The enduring task for both psychiatry and religion is to enable human beings to live their lives with courage, sense, and optimism, to strive towards creating conditions of well-being and individual, public and global mental health as well as to dispel beliefs and patterns which trap people in lives of misery and mental disorders. Psychiatry and religion in creative dialogues as allies can significantly contribute to the healing of our broken world and promoting compassionate society and empathic civilization. When psychiatry and religion see each other as opponents or even enemies this is only because of their mutual misreading and pseudoscientific

  15. Opponent and bidirectional control of movement velocity in the basal ganglia

    Science.gov (United States)

    Yttri, Eric A.

    2016-01-01

    For goal-directed behavior it is critical that we can both select the appropriate action and learn to modify the underlying movements (e.g. the pitch of a note or velocity of a reach) to improve outcomes. The basal ganglia are a critical nexus where circuits necessary for the production of behavior, such as neocortex and thalamus, are integrated with reward signaling 1 to reinforce successful, purposive actions 2. Dorsal striatum, a major input structure of basal ganglia is composed of two opponent pathways, direct and indirect, thought to select actions that elicit positive outcomes or suppress actions that do not, respectively 3,4. Activity-dependent plasticity modulated by reward is thought to be sufficient for selecting actions in striatum 5,6. Although perturbations of basal ganglia function produce profound changes in movement 7, it remains unknown whether activity-dependent plasticity is sufficient to produce learned changes in movement kinematics, such as velocity. Here we used cell-type specific stimulation delivered in closed-loop during movement to demonstrate that activity in either the direct or indirect pathway is sufficient to produce specific and sustained increases or decreases in velocity without affecting action selection or motivation. These behavioral changes were a form of learning that accumulated over trials, persisted after the cessation of stimulation, and were abolished in the presence of dopamine antagonists. Our results reveal that the direct and indirect pathways can each bidirectionally control movement velocity, demonstrating unprecedented specificity and flexibility in the control of volition by the basal ganglia. PMID:27135927

  16. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  17. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  18. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  19. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  20. Dating and Sexual Feelings

    Science.gov (United States)

    ... Home Body Your sexuality Dating and sexual feelings Dating and sexual feelings Thinking about romance, starting to ... you learn how to stay healthy and strong. Dating older guys top If you date someone even ...

  1. A comparison of due-date selection rules

    NARCIS (Netherlands)

    Baker, K.R.; Bertrand, J.W.M.

    1981-01-01

    In sequencing and scheduling models it is usually assumed that due dates represent exogeneous information. In many practical settings, however, due dates can be discretionary, or at least negotiable. Relatively few studies have incorporated discretionary due dates, and even then the rules proposed

  2. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  3. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  4. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  5. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  6. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  7. Setting a date

    International Nuclear Information System (INIS)

    Moore, Glenis.

    1987-01-01

    Dating techniques are discussed and explained. The age range and sensitivity of different techniques are given. Potassium/argon dating, amino-acid dating, radiocarbon dating, dendrochronology, thermoluminescence and geomagnetic field dating are all mentioned. Each technique is explained and a brief history given. The techniques and equipment used by the British Museum, and some examples of archaeological articles dated are mentioned. (UK)

  8. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  9. 76 FR 10233 - Schedule of Water Charges

    Science.gov (United States)

    2011-02-24

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 420 Schedule of Water Charges AGENCY: Delaware River..., Part III, Basin Regulations--Water Supply Charges. Accordingly, the Commission's water charging rates..., 2011. Effective Date: February 24, 2011. FOR FURTHER INFORMATION CONTACT: For questions about the water...

  10. Scheduling job shop - A case study

    Science.gov (United States)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  11. The exercise and affect relationship: evidence for the dual-mode model and a modified opponent process theory.

    Science.gov (United States)

    Markowitz, Sarah M; Arent, Shawn M

    2010-10-01

    This study examined the relationship between exertion level and affect using the framework of opponent-process theory and the dual-mode model, with the Activation-Deactivation Adjective Checklist and the State Anxiety Inventory among 14 active and 14 sedentary participants doing 20 min of treadmill exercise at speeds of 5% below, 5% above, and at lactate threshold (LT). We found a significant effect of time, condition, Time × Condition, and Time × Group, but no group, Group × Condition, or Time × Group × Condition effects, such that the 5% above LT condition produced a worsening of affect in-task compared with all other conditions whereas, across conditions, participants experienced in-task increases in energy and tension, and in-task decreases in tiredness and calmness relative to baseline. Posttask, participants experienced mood improvement (decreased tension, anxiety, and increased calmness) across conditions, with a 30-min delay in the above LT condition. These results partially support the dual-mode model and a modified opponent-process theory.

  12. Ready for a fight? The physiological effects of detecting an opponent's pheromone cues prior to a contest.

    Science.gov (United States)

    Garcia, Mark J; Williams, John; Sinderman, Benjamin; Earley, Ryan L

    2015-10-01

    Reception of pheromone cues can elicit significant physiological (e.g. steroid hormone levels) changes in the recipient. These pheromone-induced physiological changes have been well documented for male-female interactions, but scarcely in same-sex interactions (male-male and female-female). We sought to address this dearth in the current literature and examine whether mangrove rivulus fish (Kryptolebias marmoratus) could detect and, ultimately, mount a physiological response to the pheromone signature of a potential, same-sex competitor. We examined steroid hormone levels in mangrove rivulus exposed to one of three treatments: 1) isolation, 2) exposure to pheromones of a size-matched partner, and 3) pheromone exposure to a size-matched opponent followed by a physical encounter with the opponent. We found that exposure to a competitor's pheromone cues elicited a significant increase in testosterone levels. Increases in testosterone were similar across genetically distinct lineages derived from geographically distinct populations. Further, testosterone levels were similar between individuals only exposed to pheromone cues and individuals exposed to both pheromone cues and a subsequent physical encounter. Our findings led us to generate a number of testable predictions regarding how mangrove rivulus utilize pheromone signals in social interactions, the molecular mechanisms linking social stimuli and hormonal responses, and the possible adaptive benefits of hormonal responsiveness to receiving a potential competitor's pheromone cues. Copyright © 2015 Elsevier Inc. All rights reserved.

  13. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  14. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  15. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  16. Understanding Teen Dating Violence

    Science.gov (United States)

    Understanding Teen Dating Violence Fact Sheet 2014 Dating violence is a type of intimate partner violence. It occurs between two people in a close relationship. The nature of dating violence can be physical, emotional, or sexual. • Physical— This ...

  17. Teen Dating Violence

    Science.gov (United States)

    ... Room Social Media Publications Injury Center Teen Dating Violence Recommend on Facebook Tweet Share Compartir On This ... serious forms of violence. What is teen dating violence? Teen Dating Violence [550 KB, 2 Pages, 508] ...

  18. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  19. Parallel machine scheduling with release dates, due dates and family setup times

    NARCIS (Netherlands)

    Schutten, Johannes M.J.; Leussink, R.A.M.

    1996-01-01

    In manufacturing, there is a fundamental conflict between efficient production and delivery performance. Maximizing machine utilization by batching similar jobs may lead to poor delivery performance. Minimizing customers' dissatisfaction may lead to an inefficient use of the machines. In this paper,

  20. 77 FR 42332 - Large Power Transformers From Korea; Revised Schedule for the Subject Investigation

    Science.gov (United States)

    2012-07-18

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1189 (Final)] Large Power Transformers From Korea; Revised Schedule for the Subject Investigation AGENCY: United States International Trade Commission. ACTION: Notice. DATES: Effective Date: July 12, 2012. FOR FURTHER INFORMATION CONTACT: Edward...

  1. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  2. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  3. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  4. Progress in radiocarbon dating

    International Nuclear Information System (INIS)

    Hedges, R.E.M.

    1985-01-01

    The article concerns radiocarbon dating, the most important method for dating in archaeology. The principles and practice of the dating method are described. Recent developments in radiocarbon dating due to technical advances, are discussed, and include radiometric counting of small samples and accelerator mass spectrometry. Carbon isotopes and the environment are also discussed. (U.K.)

  5. Physiological outperformance at the morphologically-transformed edge of the cyanobacteriosponge Terpios hoshinota (Suberitidae: Hadromerida when confronting opponent corals.

    Directory of Open Access Journals (Sweden)

    Jih-Terng Wang

    Full Text Available Terpios hoshinota, an encrusting cyanosponge, is known as a strong substrate competitor of reef-building corals that kills encountered coral by overgrowth. Terpios outbreaks cause significant declines in living coral cover in Indo-Pacific coral reefs, with the damage usually lasting for decades. Recent studies show that there are morphological transformations at a sponge's growth front when confronting corals. Whether these morphological transformations at coral contacts are involved with physiological outperformance (e.g., higher metabolic activity or nutritional status over other portions of Terpios remains equivocal. In this study, we compared the indicators of photosynthetic capability and nitrogen status of a sponge-cyanobacteria association at proximal, middle, and distal portions of opponent corals. Terpios tissues in contact with corals displayed significant increases in photosynthetic oxygen production (ca. 61%, the δ13C value (ca. 4%, free proteinogenic amino acid content (ca. 85%, and Gln/Glu ratio (ca. 115% compared to middle and distal parts of the sponge. In contrast, the maximum quantum yield (Fv/Fm, which is the indicator usually used to represent the integrity of photosystem II, of cyanobacteria photosynthesis was low (0.256~0.319 and showed an inverse trend of higher values in the distal portion of the sponge that might be due to high and variable levels of cyanobacterial phycocyanin. The inconsistent results between photosynthetic oxygen production and Fv/Fm values indicated that maximum quantum yields might not be a suitable indicator to represent the photosynthetic function of the Terpios-cyanobacteria association. Our data conclusively suggest that Terpios hoshinota competes with opponent corals not only by the morphological transformation of the sponge-cyanobacteria association but also by physiological outperformance in accumulating resources for the battle.

  6. Scheduling Agreeable Jobs On A Single Machine To Minimize ...

    African Journals Online (AJOL)

    Journal of Applied Science and Technology ... (NP) scheduling of number of jobs on a single machine to minimize weighted number of early and tardy jobs where the earliest start times and latest due date are agreeable (i.e. earliest start time must increase in the same sequence as latest due dates) has been considered.

  7. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  8. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  9. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  10. CERN confirms LHC schedule

    CERN Document Server

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  11. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  12. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  13. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  14. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-11-01

    This single page document is the November 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the production reactor.

  15. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-01

    This single page document is the October 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  16. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-15

    This single page document is the October 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  17. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-09-15

    This single page document is the September 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  18. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-15

    This single page document is the December 16, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  19. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-01

    This single page document is the December 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  20. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  1. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  2. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  3. Game Schedules and Rate of Concussions in the National Football League.

    Science.gov (United States)

    Teramoto, Masaru; Cushman, Daniel M; Cross, Chad L; Curtiss, Heather M; Willick, Stuart E

    2017-11-01

    Concussion prevention in the National Football League (NFL) is an important priority for player safety. The NFL now has modified game schedules, and one concern is that unconventional game schedules, such as a shortened rest period due to playing on a Thursday rather than during the weekend, may lead to an increased risk of injuries. Unconventional game schedules in the NFL are associated with an increased rate of concussion. Descriptive epidemiological study. This study analyzed concussions and game schedules over the NFL regular seasons from 2012 to 2015 (4 years). Documented numbers of concussions, identified by use of the online database PBS Frontline Concussion Watch, were summarized by regular-season weeks. Association of days of rest and game location (home, away, or overseas) with the rate of concussion was examined by use of the χ 2 test. Logistic regression analysis was performed to examine the relationships of days of rest and home/away games to the risk of repeated concussions, with adjustment for player position. A total of 582 concussions were analyzed in this study. A significantly greater number of concussions occurred in the second half of the season ( P game location, or timing of the bye week by the team or the opponent ( P > .05). Game schedules were not significantly associated with the occurrence of repeat concussions ( P > .05). Unconventional game schedules in the NFL, including playing on Thursday and playing overseas, do not seem to put players at increased risk of concussions.

  4. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  5. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  6. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  7. It's the End of the World as we Know it: Populist Strategies of the Family Code Opponents

    Directory of Open Access Journals (Sweden)

    Roman Kuhar

    2015-06-01

    Full Text Available The starting hypothesis is connected to the new role of the Roman Catholic Church (RCC in policy discussions on issues related to sexual citizenship: RCC is secularizing its image and discourse by establishing satellite organizations working on its behalf, in order to clericalize society. One of such satellite organizations is the Civil Initiative for the Family and Rights of Children (CIFRC, which was the main opponent of the new Family Code. In this paper we use critical frame analysis in order to analyze CIFRC’s discourse, placing it in the context of political homophobia and populist action. The central framework of CIFRC’s discourse was a creation of homosexuality as a threat — first in relation to the “innocent” children, but also in relation to the “real” family. Their discourse contains simple problem-solution binaries, in which the problem can be solved by (legal, symbolic, physical removal of those who are constituted as a problem in the first place (homosexuals. In the concluding part of the article, we contextualize the results of the study by introducing a broader European dimension of conservative mass movements against so-called theory or ideology of gender. This is a new chapter in the battle against human rights of LGBT-persons, in which language and concepts, which were until recently used by the proponents of gender equality and human rights of LGBT-persons, are now (abused by conservative forces.

  8. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  9. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  10. Correlates of minimal dating.

    Science.gov (United States)

    Leck, Kira

    2006-10-01

    Researchers have associated minimal dating with numerous factors. The present author tested shyness, introversion, physical attractiveness, performance evaluation, anxiety, social skill, social self-esteem, and loneliness to determine the nature of their relationships with 2 measures of self-reported minimal dating in a sample of 175 college students. For women, shyness, introversion, physical attractiveness, self-rated anxiety, social self-esteem, and loneliness correlated with 1 or both measures of minimal dating. For men, physical attractiveness, observer-rated social skill, social self-esteem, and loneliness correlated with 1 or both measures of minimal dating. The patterns of relationships were not identical for the 2 indicators of minimal dating, indicating the possibility that minimal dating is not a single construct as researchers previously believed. The present author discussed implications and suggestions for future researchers.

  11. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  12. Dating of cremated bones

    OpenAIRE

    Lanting, JN; Aerts-Bijma, AT; van der Plicht, J; Boaretto, E.; Carmi, I.

    2001-01-01

    When dating unburnt bone, bone collagen, the organic fraction of the bone, is used. Collagen does not survive the heat of the cremation pyre, so dating of cremated bone has been considered impossible. Structural carbonate in the mineral fraction of the bone, however, survives the cremation process. We developed a method of dating cremated bone by accelerator mass spectrometry (AMS), using this carbonate fraction. Here we present results for a variety of prehistoric sites and ages, showing a r...

  13. Carbon 14 dating method

    International Nuclear Information System (INIS)

    Fortin, Ph.

    2000-01-01

    This document gives a first introduction to 14 C dating as it is put into practice at the radiocarbon dating centre of Claude-Bernard university (Lyon-1 univ., Villeurbanne, France): general considerations and recalls of nuclear physics; the 14 C dating method; the initial standard activity; the isotopic fractioning; the measurement of samples activity; the liquid-scintillation counters; the calibration and correction of 14 C dates; the preparation of samples; the benzene synthesis; the current applications of the method. (J.S.)

  14. Irradiation of dates

    International Nuclear Information System (INIS)

    Farkas, J.; Al-Charchafchy, F.; Al-Shaikhaly, M.H.; Mirjan, J.; Auda, H.

    1974-01-01

    Testing of the technical feasibility of radurization of fresh dates was attempted. In addition preliminary studies were carried out to investigate the applicability of gamma rays to date syrup manufacture. The varieties Zahdi, Lelwi and Tabarzel were studied at different stages of ripening. The eating quality of fresh dates was not affected significantly by irradiation even with doses of 270 and 540 krad. The duration of the softening process, after-ripening, of dates was prolonged by low doses of 10-30 krad in the majority of the experimental batches. The time period of after-ripening was reduced with 270 krad, as well as with 540 krad as a result of shortening of the induction period, i.e. the time after which the date begins to soften. The microbial spoilage of khalaal Lelwi dates was considerably reduced by irradiation with doses above 90 krad. The dibis yield of fully rutab dates was highly increased by the radiation doses of 375 to 2000 krad. The darkness and viable cell count of dibis pressed from irradiated dates were significantly lower than that of untreated dates. (F.J.)

  15. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  16. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard F.; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms,

  17. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  18. Practical job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1998-01-01

    The Shifting Bottleneck procedure is an intuitive and reasonably good approximation algorithm for the notoriously difficult classical job shop scheduling problem. The principle of decomposing a classical job shop problem into a series of single-machine problems can also easily be applied to job shop

  19. "Creative" Work Schedules.

    Science.gov (United States)

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  20. S K Date

    Indian Academy of Sciences (India)

    Home; Journals; Bulletin of Materials Science. S K Date. Articles written in Bulletin of Materials Science. Volume 23 Issue 2 April 2000 pp 97-101 Magnetic Materials. Comparison of the irreversible thermomagnetic behaviour of some ferro- and ferrimagnetic systems · P S Anil Kumar P A Joy S K Date · More Details Abstract ...

  1. Second Quaternary dating workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    The second Quaternary dating methods workshop was held at Lucas Heights and sponsored by ANSTO and AINSE. Topics covered include, isotope and thermoluminescence dating, usage of accelerator and thermal ionisation mass spectrometry in environmental studies emphasizing on the methodologies used and sample preparation

  2. Dating of cremated bones

    NARCIS (Netherlands)

    Lanting, JN; Aerts-Bijma, AT; van der Plicht, J; Boaretto, E.; Carmi, I.

    2001-01-01

    When dating unburnt bone, bone collagen, the organic fraction of the bone, is used. Collagen does not survive the heat of the cremation pyre, so dating of cremated bone has been considered impossible. Structural carbonate in the mineral fraction of the bone, however, survives the cremation process.

  3. Second Quaternary dating workshop

    International Nuclear Information System (INIS)

    1999-01-01

    The second Quaternary dating methods workshop was held at Lucas Heights and sponsored by ANSTO and AINSE. Topics covered include, isotope and thermoluminescence dating, usage of accelerator and thermal ionisation mass spectrometry in environmental studies emphasizing on the methodologies used and sample preparation

  4. Quaternary dating methods

    International Nuclear Information System (INIS)

    Mahaney, W.C.

    1984-01-01

    The papers in this book cover absolute, relative and multiple dating methods, and have been written by specialists from a number of different earth sciences disciplines - their common interest being the dating of geological materials within the Quaternary. Papers on absolute dating methods discuss radiocarbon, uranium-series, potassium argon, 40 Ar/ 39 Ar, paleomagnetic, obsidian hydration, thermoluminescence, amino acid racemization, tree rings, and lichenometric techniques. Those on relative dating include discussions on various geomorphic relative age indicators such as drainage density changes, hypsometric integrals, bifurcation ratios, stream junction angles, spur morphology, hillslope geometry, and till sheet characteristics. The papers on multiple dating cite examples from the Rocky Mountains, Australia, Lake Agassiz Basin, and the Southern Andes. Also included is the panel discussion which reviews and assesses the information presented, and a field trip guide which discusses the sequences of Wisconian tills and interlayered lacustrine and fluvial sediments. (orig.)

  5. Luminescence dating in archaeology

    International Nuclear Information System (INIS)

    Wintle, A.G.

    2001-01-01

    Thermoluminescence (TL) dating is routinely applied to burnt lithic material. Simple fires are capable of enabling stones weighing a few hundred grams to reach 450 o C, thus zeroing the TL signal. TL dates have been obtained for Upper and Lower Paleolithic sites in Europe and the Near East. TL dating continues to be used for dating pottery and for authentification of ceramic works of art. Some recent studies report the use of optically stimulated luminescence (OSL) (also know as photoluminescence) for dating very small samples of quartz, e.g. from small pieces of pottery or frm metallurgical slag The major recent advance has been in the development of a reliable laboratory procedure for using the OSL signal from quartz to obtain the past radiation exposure. The quartz OSL signal is extremely sensitive to light and is reduced to a negligible level on exposure to direct sunlight for radionuclides during burial, signal to date san.sized quartz grains extracted from sediments, The OSL signal is stimulated by 470 nm light from emitting diodes and the detected using flirters centred on 340 nm A similar signal can be obtained from feldspar grain when are exposed to infrared wavelengths around 880 nm. The infrared stimulated luminescence (IRSL) signals is also rapidly depleted by exposure to sunlight, and dating of colluvial deposits from archaeological sites has been reported

  6. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  7. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  8. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  9. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  10. Scheduling of resource-constrained projects

    CERN Document Server

    Klein, Robert

    2000-01-01

    Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practiti...

  11. Date Rape (For Teens)

    Science.gov (United States)

    ... owe" someone sex, even if you're a couple. Rape is not always violent. If you say " ... date rape" drugs like: rohypnol , called roofies, lunch money, or mind erasers GHB (gamma hydroxybutyric acid), called ...

  12. Methods of dating

    Energy Technology Data Exchange (ETDEWEB)

    Gatty, B

    1986-04-01

    Scientific methods of dating, born less than thirty years ago, have recently improved tremendously. First the dating principles will be given; then it will be explained how, through natural radioactivity, we can have access to the age of an event or an object; the case of radiocarbon will be especially emphasized. The principle of relative methods such as thermoluminescence or paleomagnetism will also be shortly given. What is the use for dating. The fields of its application are numerous; through these methods, relatively precise ages can be given to the major events which have been keys in the history of universe, life and man; thus, dating is a useful scientific tool in astrophysics, geology, biology, anthropology and archeology. Even if certain ages are still subject to controversies, we can say that these methods have confirmed evolution's continuity, be it on a cosmic, biologic or human scale, where ages are measured in billions, millions or thousands of years respectively.

  13. Radiometric dating methods

    International Nuclear Information System (INIS)

    Bourdon, B.

    2003-01-01

    The general principle of isotope dating methods is based on the presence of radioactive isotopes in the geologic or archaeological object to be dated. The decay with time of these isotopes is used to determine the 'zero' time corresponding to the event to be dated. This paper recalls the general principle of isotope dating methods (bases, analytical methods, validation of results and uncertainties) and presents the methods based on natural radioactivity (Rb-Sr, Sm-Nd, U-Pb, Re-Os, K-Ar (Ar-Ar), U-Th-Ra- 210 Pb, U-Pa, 14 C, 36 Cl, 10 Be) and the methods based on artificial radioactivity with their applications. Finally, the methods based on irradiation damages (thermoluminescence, fission tracks, electron spin resonance) are briefly evoked. (J.S.)

  14. NAIP 2012 Image Dates

    Data.gov (United States)

    Farm Service Agency, Department of Agriculture — This map is produced by the Aerial Phtography Field Office (APFO) to show the image acquisition dates for the 2012 National Agriculture Imagery Program (NAIP)...

  15. NAIP 2014 Image Dates

    Data.gov (United States)

    Farm Service Agency, Department of Agriculture — This map is produced by the Aerial Phtography Field Office (APFO) to show the image acquisition dates for the 2014 National Agriculture Imagery Program (NAIP)...

  16. Food Product Dating

    Science.gov (United States)

    ... Standard Forms FSIS United States Department of Agriculture Food Safety and Inspection Service About FSIS District Offices ... Web Content Viewer (JSR 286) Actions ${title} Loading... Food Product Dating "Best if Used By" is a ...

  17. NAIP 2013 Image Dates

    Data.gov (United States)

    Farm Service Agency, Department of Agriculture — This map is produced by the Aerial Phtography Field Office (APFO) to show the image acquisition dates for the 2013 National Agriculture Imagery Program (NAIP)...

  18. NAIP 2011 Image Dates

    Data.gov (United States)

    Farm Service Agency, Department of Agriculture — This map is produced by the Aerial Phtography Field Office (APFO) to show the image acquisition dates for the 2011 National Agriculture Imagery Program (NAIP)...

  19. Dating fossil opal phytoliths

    International Nuclear Information System (INIS)

    Lentfer, C.; Boyd, B.; Torrence, R.

    1999-01-01

    Full text: Opal phytoliths are microscopic silica bodies formed by the precipitation of hydrated silica dioxide (SiO 2 nH 2 0) in, around and between cell walls. They are relatively resistant to degradation in most environments and thus, can occur in large quantities in palaeosediments. Consequently, they are valuable tools for environmental reconstruction. Furthermore, phytoliths are often the only recoverable organic material in well oxidised sediments, the occluded carbon provides the opportunity for dating sediment whose ages have previously been difficult to determine, and thus, increase the potential for fine resolution determination of environmental change. This poster describes the results of an investigation assessing the viability of AMS radiocarbon dating of fossil phytolith inclusions using samples from Garua Island, West New Britain, PNG. Thirteen phytolith samples, isolated from sediments previously dated using tephrastratigraphy and C14 dating of macroremains of nutshells and wood charcoal, were used in the analysis. As a control measure, thirteen parallel samples of microscopic charcoal were also dated using AMS. The results show that the AMS dates for the microscopic charcoal samples are consistent with ages anticipated from the other dating methods, for all but one sample. However, the dates for eight of the thirteen phytolith samples are considerably younger than expected. This bias could be explained by several factors, including downwashing of phytolith through soils, bioturbation, carbon exchange through the siliceous matrix of the phytolith bodies, and contamination from extraneous sources of modern carbon retained in the samples. Research is currently focusing on the investigation of these issues and selected samples are in the process of being retreated with strong oxidising agents to clear contaminants prior to re-dating. Further to this, a full investigation of one profile with a long sequence is underway. High concentrations of

  20. Preparatory Body State before Reacting to an Opponent: Short-Term Joint Torque Fluctuation in Real-Time Competitive Sports.

    Science.gov (United States)

    Fujii, Keisuke; Yamashita, Daichi; Kimura, Tetsuya; Isaka, Tadao; Kouzaki, Motoki

    2015-01-01

    In a competitive sport, the outcome of a game is determined by an athlete's relationship with an unpredictable and uncontrolled opponent. We have previously analyzed the preparatory state of ground reaction forces (GRFs) dividing non-weighted and weighted states (i.e., vertical GRFs below and above 120% of body weight, respectively) in a competitive ballgame task and demonstrated that the non-weighted state prevented delay of the defensive step and promoted successful guarding. However, the associated kinetics of lower extremity joints during a competitive sports task remains unknown. The present study aims to investigate the kinetic characteristics of a real-time competitive sport before movement initiation. As a first kinetic study on a competitive sport, we initially compared the successful defensive kinetics with a relatively stable preparatory state and the choice-reaction sidestep as a control movement. Then, we investigated the kinetic cause of the outcome in a 1-on-1 dribble in terms of the preparatory states according to our previous study. The results demonstrated that in successful defensive motions in the non-weighted state guarding trial, the times required for the generation of hip abduction and three extension torques for the hip, knee, and ankle joints were significantly shortened compared with the choice-reaction sidestep, and hip abduction and hip extension torques were produced almost simultaneously. The sport-specific movement kinetics emerges only in a more-realistic interactive experimental setting. A comparison of the outcomes in the 1-on-1 dribble and preparatory GRF states showed that, in the non-weighted state, the defenders guarded successfully in 68.0% of the trials, and the defender's initiation time was earlier than that in the weighted state (39.1%). In terms of kinetics, the root mean squares of the derivative of hip abduction and three extension torques in the non-weighted state were smaller than those in the weighted state

  1. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  2. Auspicious birth dates among Chinese in California.

    Science.gov (United States)

    Almond, Douglas; Chee, Christine Pal; Sviatschi, Maria Micaela; Zhong, Nan

    2015-07-01

    The number eight is considered lucky in Chinese culture, e.g. the Beijing Olympics began at 8:08 pm on 8/8/2008. Given the potential for discretion in selecting particular dates of labor induction or scheduled Cesarean section (C-section), we consider whether Chinese-American births in California occur disproportionately on the 8th, 18th, or 28th day of the month. We find 2.3% "too many" Chinese births on these auspicious birth dates, whereas Whites show no corresponding increase. The increase in Chinese births is driven by higher parity C-sections: the number of repeat C-sections is 6% "too high" on auspicious birth dates. Sons born to Chinese parents account for the entire increase; daughter deliveries do not seem to be timed to achieve "lucky" birth dates. We also find avoidance of repeat C-section deliveries on the 4th, 14th, and 24th of the month, considered unlucky in Chinese culture. Finally, we replicate earlier work finding that Friday the 13th delivery dates are avoided and document a particularly large decrease among Chinese. For Whites and Chinese in California, mothers with higher levels of education are particularly likely to avoid delivering on the 13th. Copyright © 2015 Elsevier B.V. All rights reserved.

  3. Practical quantum appointment scheduling

    Science.gov (United States)

    Touchette, Dave; Lovitz, Benjamin; Lütkenhaus, Norbert

    2018-04-01

    We propose a protocol based on coherent states and linear optics operations for solving the appointment-scheduling problem. Our main protocol leaks strictly less information about each party's input than the optimal classical protocol, even when considering experimental errors. Along with the ability to generate constant-amplitude coherent states over two modes, this protocol requires the ability to transfer these modes back-and-forth between the two parties multiple times with very low losses. The implementation requirements are thus still challenging. Along the way, we develop tools to study quantum information cost of interactive protocols in the finite regime.

  4. History of radiocarbon dating

    Energy Technology Data Exchange (ETDEWEB)

    Libby, W F [Department of Chemistry and Institute of Geophysics, University of California, Los Angeles, CA (United States)

    1967-08-15

    The development is traced of radiocarbon dating from its birth in curiosity regarding the effects of cosmic radiation on Earth. Discussed in historical perspective are: the significance of the initial measurements in determining the course of developments; the advent of the low-level counting technique; attempts to avoid low-level counting by the use of isotopic enrichment; the gradual appearance of the environmental effect due to the combustion of fossil fuel (Suess effect); recognition of the atmosphere ocean barrier for carbon dioxide exchange; detailed understanding of the mixing mechanism from the study of fallout radiocarbon; determination of the new half-life; indexing and the assimilation problem for the massive accumulation of dates; and the proliferation of measurement techniques and the impact of archaeological insight on the validity of radiocarbon dates. (author)

  5. A transportation-scheduling system for managing silvicultural projects

    Science.gov (United States)

    Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald

    2005-01-01

    A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...

  6. 76 FR 39159 - Schedule for Rating Disabilities; The Digestive System

    Science.gov (United States)

    2011-07-05

    ... of this change is to incorporate medical advances that have occurred since the last review, insert current medical terminology, and provide clear criteria. DATES: Comments must be received by VA on or... the rating schedule, and implement current medical criteria and terminology that reflect recent...

  7. Decentralization and mechanism design for online machine scheduling

    NARCIS (Netherlands)

    Arge, Lars; Heydenreich, Birgit; Müller, Rudolf; Freivalds, Rusins; Uetz, Marc Jochen

    We study the online version of the classical parallel machine scheduling problem to minimize the total weighted completion time from a new perspective: We assume that the data of each job, namely its release date $r_j$, its processing time $p_j$ and its weight $w_j$ is only known to the job itself,

  8. 50 CFR 34.6 - Schedule of appraisals.

    Science.gov (United States)

    2010-10-01

    ... Secretary shall make fair market value appraisals of areas administered by the Service within five years... reappraised on a schedule of at least once every five years. Until areas are appraised, the fair market value... fee lands added to such areas after that date shall be on the basis of fair market value. ...

  9. The Thera eruption: continuing discussion of the dating

    International Nuclear Information System (INIS)

    Aitken, M.J.; Betancourt, P.P.

    1988-01-01

    Until recently it had been generally accepted that the radiocarbon dates for the destruction levels at Akrotiri resulting from the Minoan eruption of Thera on the Aegean island of Santorini 'did not make sense', interference by carbon dioxide emanations from the volcano, deficient in carbon-14, sometimes being suggested as the cause (as recently discussed by Olsson 1987). The scatter was said to be unacceptably large, but above all, after calibration the majority of dates were at least a century earlier than expected on the basis of the accepted Minoan chronology, established by archaeological linkages to the Egyptian astronomically-anchored calendar. The situation has now been changed. First, from a reassessment of linkages it has been proposed (Betancourt 1987) that the relevant Late Minoan period (LM IA) started at least a century earlier than according to the usual chronology. Secondly, accurate high-precision calibration curves have become available (e.g. Pearson and Stuiver 1986); although previous curves are generally concordant with these, for the relevant period the new calibration has the effect of making calibrated dates more recent by about half a century. The purpose of the present note is to bring together the various datings that are now extant. Although a shift of a century may seem trivial to those remote from Aegean archaeology the topic is of more than local interest on account of the tendency for opponents of radiocarbon to use the dates as 'yet another example of failure' and of the challenge to science-based techniques to provide an unambiguous result for this major natural catastrophy. (author)

  10. 75 FR 41891 - Certain Footwear: Recommendations for Modifying the Harmonized Tariff Schedule of the United States

    Science.gov (United States)

    2010-07-19

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 1205-8] Certain Footwear: Recommendations for Modifying the Harmonized Tariff Schedule of the United States AGENCY: United States International Trade Commission. ACTION: Change in date for transmitting final recommendations to the President. SUMMARY: The...

  11. Obsidian dating prospects

    International Nuclear Information System (INIS)

    Ambrose, W.

    1997-01-01

    Full text: Developments in the nuclear industry have shown that some of the problems related to the glassification of waste for long term storage are centred on the rate of glass weathering in various repositories. Long term weathering of artificial glasses is paralleled by the archaeological problem of determining hydration rates in obsidian artefacts as a means of dating their manufacture. Figures available for sites in Papua New Guinea indicate that the weathering rate is sufficiently fast to render conventional hydration measurement completely unreliable. This follows from the range of calculated surface reduction rates which range between .0002μ to .004μ per year depending on the site's location and the obsidian source. Hydration rates for key Papua New Guinea obsidians have been determined from long term experimental laboratory exposure and these are used to evaluate the age of obsidians from selected archaeological sites. By adopting a strategy of measuring hydration in concealed fissures both the weathering rate and the dating of the Papua New Guinea obsidians have been successfully achieved. The dissolution rates of natural obsidians could be useful in considering weathering rates for artificial glasses. An improved system for calculating the annual effective hydration temperature is presented which gives a better control of micro-environmental temperature in its crucial rate determining role. The combined result of these developments gives obsidian hydration dating an enhanced capacity to be a useful and independent dating system

  12. Confronting Dating Violence.

    Science.gov (United States)

    McNulty, Raymond J.; Heller, Daniel A.; Binet, Tracy

    1997-01-01

    To be safe havens for children, schools cannot address the intellect only. Brattleboro (Vermont) Union High School went beyond academics by sponsoring a performance of "The Yellow Dress," a powerful one-woman play about a teenage victim of dating violence. The production challenged participants to unite school and community, intellect…

  13. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  14. The Realities of Date Rape.

    Science.gov (United States)

    Presley, Cara; Watson, Jennifer; Williams, Audrey R.

    This poster presentation addresses the issue of date rape, specifically in the college environment. Highlighted are date rape statistics, demographics, and date rape drugs. Also discussed are date rape warnings and prevention strategies. It is concluded that college and university administrators must place the issue of date rape and acquaintance…

  15. Thermoluminescence dating of pottery

    International Nuclear Information System (INIS)

    Higashimura, Takenobu; Ichikawa, Yoneta.

    1978-01-01

    This report is divided into two parts. The first half describes on the history of thermoluminescence dating, and the latter half, the principle and measurement examples. It was in late 1955 that the measurement of radiation dose using thermoluminescence began. The method to thermoluminescence dating was developed when it was found that most natural stones emit the thermoluminescence. About Greek earthen wares, the study of which was presented in 1961 by G. Kennedy of University of California, the dating was able to be made within the standard deviation of 10%. Since then, this dating method progressed rapidly, and a number of laboratories are now forwarding the investigation. In the samples of natural materials, intensity of thermoluminescence I is proportional to natural radiation dose D which has been absorbed by the samples, i.e. I = kD, where k is the susceptibility of thermoluminescence of the samples. Since k is different in each sample, D can be determined by irradiating the sample with β or γ ray of known dose D 0 , measuring its luminescence I 0 , and eliminating k through these two equations, because i 0 = kD 0 . Next, if t is assumed to be the time passed since a pottery was made, D is expressed as Rt, where R is the natural radiation dose per year absorbed by the pottery. Thus t is determined if R is known. The report describes on the method of measuring R. As an example, the results of measurement of the potteries excavated at Iwakura remains, Yorikura, Taishaku-kyo, are listed. Results by 14 C dating are also described for reference. (Wakatsuki, Y.)

  16. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  17. Cbs (Contrastrain Based Schedulling Adalah Faktor Penentu Keberhasilan Perusahanan Printing

    Directory of Open Access Journals (Sweden)

    Hendra Achmadi

    2010-06-01

    Full Text Available In a highly competitive industry faces today ranging from small or home-based printing to using machine that can print offset a hundred thousand copies per hour. But, the increasing competition resulted in requiring a faster production time from order entry, print proff until the production process to delivery to customers. Often times in case of orders which will result in the concurrent PPIC will experience vertigo in the setting of production schedules which have concurrent delivery time. Often will end up with no receipt of orders due to difficulties in the production schedule, especially if the orders require the same offset machine and cylinder wear the same length, while the number of cylinders is limited. Therefore, the printing company should be able to do so in the conduct of a penetration timing of production can easily be simulated and implemented on the ground. CBS (Base Constraint scheduling is a technique to do the scheduling of production so that production can be carried out smoothly and quickly that fulfill the promise made to customers. In scheduling, there are several techniques that can be used are: FCFS (First Came First Serve, EDD (Earliest Date, and LCLS (Last Came Last Serve. So, it is required to be able to do way better scheduling to get results quickly in this fast changing schedules.

  18. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    . The rostering process is non-trivial and especially when service is required around the clock, rostering may involve considerable effort from a designated planner. Therefore, in order to minimize costs and overstaffing, to maximize the utilization of available staff, and to ensure a high level of satisfaction...... as possible to the available staff, while respecting various requirements and rules and while including possible transportation time between tasks. This thesis presents a number of industrial applications in rostering and task scheduling. The applications exist within various contexts in health care....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied...

  19. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  20. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  1. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  2. Amino acid racemisation dating

    International Nuclear Information System (INIS)

    Murray-Wallace, C.V.

    1999-01-01

    The potential of the time-dependent amino acid racemisation reaction as a method of age assessment was first reported by Hare and Abelson (1968). They noted that in specimens of the bivalve mollusc Mercenaria sp., greater concentrations of amino acids in the D-configuration with increasing fossil age. Hare and Abelson (1968) also reported negligible racemisation in a modern specimen of Mecanaria sp. On this basis they suggested that the extent of amino acid racemisation (epimerisation in the case of isoleucine) may be used to assess the age of materials within and beyond the range of radiocarbon dating. For the past thirty years amino acid racemisation has been extensively applied in Quaternary research as a method of relative and numeric dating, and a particularly large literature has emerged on the subject

  3. Dating fractures in infants

    Energy Technology Data Exchange (ETDEWEB)

    Halliday, K.E., E-mail: kath.halliday@nuh.nhs.uk [Department of Radiology, Nottingham University Hospitals, Queen' s Medical Centre, Nottingham (United Kingdom); Broderick, N J; Somers, J M [Department of Radiology, Nottingham University Hospitals, Queen' s Medical Centre, Nottingham (United Kingdom); Hawkes, R [Department of Radiology, Paul O' Gorman Building, Bristol (United Kingdom)

    2011-11-15

    Aim: To document the timing of the appearance of the radiological features of fracture healing in a group of infants in which the date of injury was known and to assess the degree of interobserver agreement. Materials and methods: Three paediatric radiologists independently assessed 161 images of 37 long bone fractures in 31 patients aged 0-44 months. The following features were assessed: soft-tissue swelling, subperiosteal new bone formation (SPNBF), definition of fracture line, presence or absence of callus, whether callus was well or ill defined, and the presence of endosteal callus. Results: Agreement between observers was only moderate for all discriminators except SPNBF. SPNBF was invariably seen after 11 days but was uncommon before this time even in the very young. In one case SPNBF was seen at 4 days. Conclusion: With the exception of SPNBF, the criteria relied on to date fractures are either not reproducible or are poor discriminators of fracture age.

  4. Dating fractures in infants

    International Nuclear Information System (INIS)

    Halliday, K.E.; Broderick, N.J.; Somers, J.M.; Hawkes, R.

    2011-01-01

    Aim: To document the timing of the appearance of the radiological features of fracture healing in a group of infants in which the date of injury was known and to assess the degree of interobserver agreement. Materials and methods: Three paediatric radiologists independently assessed 161 images of 37 long bone fractures in 31 patients aged 0-44 months. The following features were assessed: soft-tissue swelling, subperiosteal new bone formation (SPNBF), definition of fracture line, presence or absence of callus, whether callus was well or ill defined, and the presence of endosteal callus. Results: Agreement between observers was only moderate for all discriminators except SPNBF. SPNBF was invariably seen after 11 days but was uncommon before this time even in the very young. In one case SPNBF was seen at 4 days. Conclusion: With the exception of SPNBF, the criteria relied on to date fractures are either not reproducible or are poor discriminators of fracture age.

  5. Thermoluminescence dating method

    International Nuclear Information System (INIS)

    Zink, A.

    2004-01-01

    A crystal that is submitted to radiation stores energy and releases this energy under the form of light whenever it is heated. These 2 properties: the ability to store energy and the ability to reset the energy stored are the pillars on which time dating methods like thermoluminescence are based. A typical accuracy of the thermoluminescence method is between 5 to 7% but an accuracy of 3% can be reached with a sufficient number of measurement. This article describes the application of thermoluminescence to the dating of a series of old terra-cotta statues. This time measurement is absolute and does not require any calibration, it represents the time elapsed since the last heating of the artifact. (A.C.)

  6. Radiocarbon dating for contributors

    International Nuclear Information System (INIS)

    Jansen, H.S.

    1984-06-01

    This report describes the radiocarbon facility at the Institute of Nuclear Sciences, and is written for potential contributors, current users, and for those who advise others. The report briefly outlines the principles and practices of C-14 dating; with emphasis on factors that enable contributors to judge whether C-14 work is appropriate, and to assist them with the procedures to be followed in order to get the best results. Age determinations, being the main requirements by contributors, have been discussed in detail

  7. Sediment dating in review

    International Nuclear Information System (INIS)

    Prescott, J.R.; Robertson, G.B.

    1997-01-01

    The paper will comment on a few issues of particular relevance to Australasia. Thermoluminescent (TL) methods applied to open sites have been demonstrated to be effective. A particularly good example of this is to be found in the South East of South Australia, where a sequence of low ranges runs roughly parallel with the coast. They represent relict sand dunes left behind, on a slowly rising land surface by successive interglacial incursions of the sea at roughly 120 ka intervals. Comparison with ages established on independent geological grounds allows a test of quartz TL and IRSL ages that is believable back to 500 ka. Older than this, we do not yet understand the physics of the quartz well enough to go unequivocally forward (backward?). Similar results are emerging elsewhere. With dating limits being pushed ever further back, the time variation of the environmental radiation giving rise to the stored luminescent energy needs to be addressed. Particularly at wet sites, radioactive disequilibrium must be considered. In any case, a time profile of the radiation dose rate needs to be determined.In dating a given site or sites the value of ages obtained by any dating method,including C-14, is enhanced by parallel measurements with an different method

  8. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  9. Vaccinating my way--use of alternative vaccination schedules in New York State.

    Science.gov (United States)

    Nadeau, Jessica A; Bednarczyk, Robert A; Masawi, Munyaradzi R; Meldrum, Megan D; Santilli, Loretta; Zansky, Shelley M; Blog, Debra S; Birkhead, Guthrie S; McNutt, Louise-Anne

    2015-01-01

    To identify children vaccinated following an alternative vaccine schedule using immunization information system data and determine the impact of alternative schedule use on vaccine coverage. Children born in New York State, outside New York City, between January 1, 2009 and August 14, 2011 were assessed for vaccination patterns consistent with use of an alternative schedule. Children who by 9 months of age had at least 3 vaccination visits recorded in the statewide mandatory immunization information system after 41 days of age were classified as either attempting to conform to the Centers for Disease Control and Prevention published recommended vaccination schedule or an alternative schedule. The number of vaccination visits and up-to-date status at age 9 months were compared between groups. Of the 222 628 children studied, the proportion of children following an alternative schedule was 25%. These children were significantly less likely to be up-to-date at age 9 months (15%) compared with those conforming to the routine schedule (90%, P Children following an alternative schedule on average had about 2 extra vaccine visits compared with children following a routine schedule (P children in this study appear to be intentionally deviating from the routine schedule. Intentional deviation leads to poor vaccination coverage leaving children vulnerable to infection and increasing the potential for vaccine-preventable disease outbreaks. Copyright © 2015 Elsevier Inc. All rights reserved.

  10. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  11. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  12. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  13. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  14. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  15. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  16. Dating Violence among College Students

    Science.gov (United States)

    Iconis, Rosemary

    2013-01-01

    Dating violence is a significant problem on college campuses. More than one-fifth of the undergraduate dating population are physically abused by their dating partners and an even greater percentage are psychologically abused. Researchers have identified risk factors for college student dating violence. Preventive interventions are strongly…

  17. Flirting in Online Dating

    DEFF Research Database (Denmark)

    Mortensen, Kristine Køhler

    2017-01-01

    Various fields have examined the activity of flirting, predominantly based on experimental and reported data; the interactional workings are therefore often overlooked. Based on emails and chats from two Danish online dating sites, this article investigates how users negotiate romantic connections...... through the flirting strategy of ‘imagined togetherness’, linguistically constructing imagery of a shared future. Using the notion of the chronotope, turn-by-turn analysis demonstrates how users, embedded in the activity of getting to know each other, tenuously communicate romantic interest by alluding...

  18. Bomb pulse radiocarbon dating

    International Nuclear Information System (INIS)

    Tuniz, C.; Zoppi, U.; Hotchkis, M.A.C.

    2004-01-01

    Modern forensic science has to deal not only with homicides and other traditional crimes but also with more global threats such as the smuggling of nuclear materials, clandestine production of weapons of mass destruction, stockpiling of illicit drugs by state controlled groups and war crimes. Forensic applications have always benefited from the use of advanced analytical tools that can characterize materials found at crime scenes. In this paper we will discuss the use of accelerator mass spectrometry (AMS) as an ultrasensitive tool for the crime laboratories of the third millennium. An important objective in forensic science is to order past events chronologically by analysing materials associated with criminal actions. Radiocarbon dating is known to the general public for its application to historical and prehistorical investigations. Examples of forensic significance include the assassination of the Inca Atahualpa by Francisco Pizarro in the early 1530s, the possible murder of the Tyrolean Ice Man (Oetzi) 5300 years ago and the analysis of the burial cloths allegedly associated with the crucifixion of Jesus Christ . Recent murders, including those associated with war crimes in the Balkans during the 1990s, can be studied using 14 C bomb pulse dating. This method has other forensic applications, including investigation of frauds related to food and wine counterfeiting, dating of opium crops and dating of substances used in biological warfare. AMS extends the applicability of the radiocarbon method, allowing the analysis of 14 C in submilligram organic samples. Specific molecular compounds extracted from bones, hair, skin and other carbon bearing substances of forensic significance can now be dated, enhancing the sensitivity and reliability of chronological determinations. AMS can also be used to analyse rare actinide isotopes released into the environment during the clandestine production of nuclear weapons or associated with the smuggling of nuclear materials. In

  19. Updating dating down under

    International Nuclear Information System (INIS)

    Bristow, J.W.

    1986-01-01

    The article deals with the Sensitive High Resolution Ion Microprobe (SHRIMP), Australia's only microprobe and its applications for geochronology. SHRIMP has the ability to analyse tiny areas (less than 30μm across) within crystals directly, the only sample preparation required being polishing of the crystal surface. Most analyses so far have been done on separated crystals prepared as grain mounts, although an increasing number of analyses are now being made of crystals in rock thin sections where their textural associations can be established. Important features of SHRIMP are its double-focusing mass spectrometer and great physical size, more than 8 meters long, employing a magnet weighing six tons. This enables the machine to distinguish ions with atomic masses differing by less than one part in ten thousand while at the same time having a very great sensitivity. SHRIMP was used for dating crustal zircons from southern African Kimberlites. Although low U and Pb abundances presents problems in peak selection and focusing on SHRIMP its was found that kimberlitic zircons could be dated successfully

  20. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  1. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  2. Radiocarbon dates XXI

    International Nuclear Information System (INIS)

    Lowdon, J.A.; Blake, W. Jr.

    1981-01-01

    This list includes 105 radiocarbon age determinations on 104 geological samples made by the Radiocarbon Dating Laboratory. They are on samples from various areas as follows: Labrador Shelf (2); Newfoundland (12); Nova Scotia (2); New Brunswick (1); Quebec (3); Ontario (1); Manitoba (1); Alberta (2); British Columbia (15); Yukon Territory (35); Northwest Territories, Mainland (10); Northwest Territories, Arctic Archipelago (21). Details of background and standard for the 2 L and 5 L counters during the period from November 4, 1980 to October 31, 1981 are summarized in Tables 1 and 2; Table 3 gives the number of counts used to determine the average background and standard counting rates; and Table 4 lists the number of different background and standard gas preparations used for counting

  3. 29 CFR 510.10 - Table of wage rates and effective dates.

    Science.gov (United States)

    2010-07-01

    ... REGULATIONS IMPLEMENTATION OF THE MINIMUM WAGE PROVISIONS OF THE 1989 AMENDMENTS TO THE FAIR LABOR STANDARDS ACT IN PUERTO RICO Schedule of Minimum Wage Rates Applicable in Puerto Rico § 510.10 Table of wage rates and effective dates. (a) The following table provides effective dates of minimum wage increases...

  4. Dates fruits classification using SVM

    Science.gov (United States)

    Alzu'bi, Reem; Anushya, A.; Hamed, Ebtisam; Al Sha'ar, Eng. Abdelnour; Vincy, B. S. Angela

    2018-04-01

    In this paper, we used SVM in classifying various types of dates using their images. Dates have interesting different characteristics that can be valuable to distinguish and determine a particular date type. These characteristics include shape, texture, and color. A system that achieves 100% accuracy was built to classify the dates which can be eatable and cannot be eatable. The built system helps the food industry and customer in classifying dates depending on specific quality measures giving best performance with specific type of dates.

  5. Cortical fMRI activation to opponents' body kinematics in sport-related anticipation: expert-novice differences with normal and point-light video.

    Science.gov (United States)

    Wright, M J; Bishop, D T; Jackson, R C; Abernethy, B

    2011-08-18

    Badminton players of varying skill levels viewed normal and point-light video clips of opponents striking the shuttle towards the viewer; their task was to predict in which quadrant of the court the shuttle would land. In a whole-brain fMRI analysis we identified bilateral cortical networks sensitive to the anticipation task relative to control stimuli. This network is more extensive and localised than previously reported. Voxel clusters responding more strongly in experts than novices were associated with all task-sensitive areas, whereas voxels responding more strongly in novices were found outside these areas. Task-sensitive areas for normal and point-light video were very similar, whereas early visual areas responded differentially, indicating the primacy of kinematic information for sport-related anticipation. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  6. Evidence for Non-Opponent Coding of Colour Information in Human Visual Cortex: Selective Loss of "Green" Sensitivity in a Subject with Damaged Ventral Occipito-Temporal Cortex.

    Science.gov (United States)

    Rauscher, Franziska G; Plant, Gordon T; James-Galton, Merle; Barbur, John L

    2011-01-01

    Damage to ventral occipito-temporal extrastriate visual cortex leads to the syndrome of prosopagnosia often with coexisting cerebral achromatopsia. A patient with this syndrome resulting in a left upper homonymous quadrantanopia, prosopagnosia, and incomplete achromatopsia is described. Chromatic sensitivity was assessed at a number of locations in the intact visual field using a dynamic luminance contrast masking technique that isolates the use of colour signals. In normal subjects chromatic detection thresholds form an elliptical contour when plotted in the Commission Internationale d'Eclairage, (x-y), chromaticity diagram. Because the extraction of colour signals in early visual processing involves opponent mechanisms, subjects with Daltonism (congenital red/green loss of sensitivity) show symmetric increase in thresholds towards the long wavelength ("red") and middle wavelength ("green") regions of the spectrum locus. This is also the case with acquired loss of chromatic sensitivity as a result of retinal or optic nerve disease. Our patient's results were an exception to this rule. Whilst his chromatic sensitivity in the central region of the visual field was reduced symmetrically for both "red/green" and "yellow/blue" directions in colour space, the subject's lower left quadrant showed a marked asymmetry in "red/green" thresholds with the greatest loss of sensitivity towards the "green" region of the spectrum locus. This spatially localized asymmetric loss of "green" but not "red" sensitivity has not been reported previously in human vision. Such loss is consistent with selective damage of neural substrates in the visual cortex that process colour information, but are spectrally non-opponent.

  7. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  8. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  9. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  10. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  11. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  12. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  13. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  14. Dating technique tested

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    An analytical technique for dating ground water and polar ice up to a million years old has been successfully tested by scientists at Oak Ridge National Laboratory (ORNL). The system, known as a rare gas atom counter, extends the capabilities of resonance ionization mass spectrometry to include counting single atoms of krypton-81. The counter is composed of a pulsed dye laser operated in tandem with a mass spectrometer to separate the various isotopes of krypton. In a collaborative study, ORNL scientists recently used the method for the first time to count krypton-81 in a liter of ground water removed from a sandstone aquifer near Zurich. Fewer than 1000 krypton-81 atoms were isolated from the ground water samples. According to Bernard Lehman, a collaborating geochemist at the University of Bern, this first test proved that counting the small numbers of krypton-81 atoms necessary to make an estimate of the age of water could actually be done. Among the applications of this method, Lehman says, could be improved siting of locations for the disposal of radioactive wastes

  15. From Preemptive to Non-preemptive Scheduling Using Rejections

    OpenAIRE

    Lucarelli , Giorgio; Srivastav , Abhinav; Trystram , Denis

    2016-01-01

    International audience; We study the classical problem of scheduling a set of independent jobs with release dates on a single machine. There exists a huge literature on the preemptive version of the problem, where the jobs can be interrupted at any moment. However, we focus here on the non-preemptive case, which is harder, but more relevant in practice. For instance, the jobs submitted to actual high performance platforms cannot be interrupted or migrated once they start their execution (due ...

  16. Simulation of less master production schedule nervousness model

    OpenAIRE

    Herrera , Carlos; Thomas , André

    2009-01-01

    International audience; In production decision making systems, Master Production Schedule (MPS) states the requirements for individual end items by date and quantity. The solution sensitivity to demand forecast changes, unforeseen supplier and production problem occurrences, is known as nervousness. This feature cause undesirable effects at tactical and operational levels. Some of these effects are production and inventory cost increases and, also, negative impacts on overall and labor produc...

  17. Optimal Results and Numerical Simulations for Flow Shop Scheduling Problems

    Directory of Open Access Journals (Sweden)

    Tao Ren

    2012-01-01

    Full Text Available This paper considers the m-machine flow shop problem with two objectives: makespan with release dates and total quadratic completion time, respectively. For Fm|rj|Cmax, we prove the asymptotic optimality for any dense scheduling when the problem scale is large enough. For Fm‖ΣCj2, improvement strategy with local search is presented to promote the performance of the classical SPT heuristic. At the end of the paper, simulations show the effectiveness of the improvement strategy.

  18. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  19. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  20. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  1. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  2. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  3. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  4. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  5. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  6. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different....... Compared to the predictions of an analyst observing untolled equilibrium and taking scheduling preferences as exogenous, we find that both the optimal capacity and the marginal external cost of congestion have changed. The benefits of tolling are greater, and the optimal time varying toll is different....

  7. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  8. Interface between the production plan and the master production schedule in assembly environments

    OpenAIRE

    Moya Navarro, Marcos; Sánchez Brenes, Magaly

    2012-01-01

    In a production environment there is a direct relationship between the market and the manufacturing process of goods.When production is immersed in an assembly environment, the process of production planning and scheduling becomes complex, and the enterprises have the risk of losing competitive advantages in terms of not meeting delivery dates and production high costs. Linear programming has become an appropriate tool for production planning and scheduling in complex manufacturing environmen...

  9. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  10. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  11. How useful are preemptive schedules?

    NARCIS (Netherlands)

    Brucker, P.; Heitmann, S.; Hurink, J.L.

    2001-01-01

    Machine scheduling admits two options to process jobs. In a preemptive mode processing may be interrupted and resumed later even on a different machine. In a nonpreemptive mode interruptions are not allowed. Usually, the possibility to preempt jobs leads to better performance values. However, also

  12. Interaction in activity location scheduling

    NARCIS (Netherlands)

    Tabak, V.; Vries, de B.; Dijkstra, J.; Jessurun, A.J.

    2006-01-01

    In this paper we discuss the interaction in activity location scheduling which is the main subject of an ongoing research project called "User Simulation of Space Utilization". The aim of this research project is to develop an overall model for the simulation of human movement and utilization of

  13. Scheduling with target start times

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Velde, van de S.L.; Klein Haneveld, W.K.; Vrieze, O.J.; Kallenberg, L.C.M.

    1997-01-01

    We address the single-machine problem of scheduling n independent jobs subject to target start times. Target start times are essentially release times that may be violated at a certain cost. The goal is to minimize an objective function that is composed of total completion time and maximum

  14. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  15. Flexible Schedules and Shift Work.

    Science.gov (United States)

    Beers, Thomas M.

    2000-01-01

    Flexible work hours have gained prominence, as more than 25 million workers (27.6% of all full-time workers) can now vary their schedules. However, there has been little change since the mid-1980s in the proportion who work a shift other than a regular daytime shift. (JOW)

  16. Scheduling periodic tasks with slack

    NARCIS (Netherlands)

    Korst, J.H.M.; Aarts, E.H.L.; Lenstra, J.K.

    1997-01-01

    We consider the problem of nonpreemptively scheduling periodic tasks on a minimum number of identical processors, assuming that some slack is allowed in the time between successive executions of a periodic task. We prove that the problem is NP-hard in the strong sense. Necessary and sufficient

  17. Toward Realistic Acquisition Schedule Estimates

    Science.gov (United States)

    2016-04-30

    replace earlier versions of the F/A-18. Joint and International Nature At the time of JSF conception, there was a clear preference at the highest levels...ALPHABET SOUP ” (Aboulafia, 2015) OF STUDIES AND CONCEPTS • … MERGED INTO JAST • … WHICH EVOLVED TO JSF • WELL-KNOWN COST AND SCHEDULE

  18. Optical stimulated luminescence (OSL) dating

    International Nuclear Information System (INIS)

    Banerjee, D.

    1999-01-01

    Since the pioneering work by Huntley et al. (1985), optical dating is being increasingly recognised as an important technique for establishing a time frame of deposition of sediments (Aitken, 1998). Optical dating differs from thermoluminescence (TL) dating in that visible/infrared light from lasers or LEDs (light-emitting-diodes) is used as a means of stimulation, in contrast to thermal stimulation. It has several advantages over TL dating: (i) the resetting of the OSL (optically stimulated luminescence) clock is more effective than that of TL clock; for sediments transported under water or in other situations where the sediment grains have undergone inhomogeneous bleaching, this property ensures that ages based on optical dating are generally more reliable than TL ages, (ii) the optical dating technique is non-destructive, and multiple readouts of the optical signal is possible; this feature has resulted in the development of single-aliquot and single-grain protocols (Murray and Wintle, 1999; Banerjee et al. 1999), (iii) the sample is not heated as in TL; thus, spurious luminescence is avoided and there is a significant reduction in blackbody radiation. Dating of materials which change phase on heating is also practical, and finally, (iv) thermal quenching of luminescence is negligible, allowing accurate estimation of kinetic parameters using standard techniques and providing access to deep OSL traps. This characteristic may be helpful in extending the limits of optical dating beyond the last 150 ka from a global point of view

  19. Luminescence dating of Netherland's sediments

    NARCIS (Netherlands)

    Wallinga, J.; Davids, F.; Dijkmans, J.W.A.

    2007-01-01

    Over the last decades luminescence dating techniques have been developed that allow earth scientists to determine the time of deposition of sediments. In this contribution we revity: 1) the development of the methodology, 2) tests of the reliability of luminescence dating on Netherlands' sediments;

  20. The isotopic dating of crystals

    International Nuclear Information System (INIS)

    Giuliani, G.; Cheilletz, A.

    1995-01-01

    The first part of this work deals with the answer to the question : why are the crystals dated ? Then, some isotopic dating methods are described : U-Th-Pb, K-Ar, 40 Ar/ 39 Ar, Rb-Sr, Sm-Nd, fission traces, carbon 14 methods. Examples concerning emeralds and diamonds are given. (O.L.). 12 refs., 2 figs

  1. The comparison of absolute dating (Radiocarbon dating) and relative dating of Pringapus and Gondosuli temples

    International Nuclear Information System (INIS)

    Faisal, W; Arumbinang, H; Taftazani, A; Widayati, S; Sumiyatno; Suhardi

    1996-01-01

    The absolute dating (radiocarbon, 14 C dating) and relative dating of Pringapus and Gondosuli temples in Temanggung regency (district) of Central Java Province have been carried out. The field sampling was done especially with the purpose to obtain vertical data, so that excavation method was adopted in the case. The main data were the ecofacts of organic habitation such as bones, woods, charcoals, shells, and paper artefacts. The artefacts data were used as a comparison. The comparative data analysis were conducted at Yogyakarta archaeological Department Laboratory, thus included dating of artefacts which were performed according to archaeological analysis procedures, generally based on the attributes attached to the artefacts, whereas the absolute dating of charcoal samples were performed in the Radiocarbon Dating Laboratory at Yogyakarta Nuclear Research Centre. Based on the relative dating of epigraphy content on the andesit rock from Gondosuli Temple which showed the year of 754 Saka or 832 AD, the Pringapus Temple was estimated to be built in the 850 AD. According to the absolute dating (Radiocarbon Dating with delta 13 C and tree ring corrections) the age for Gondosuli temple based on GDS/LU-2/Spit-7 samples is (384 -602) AD and from GDS/LU-2/Spit-8 = (452 - 652) AD. With these significant differences in the results obtained, it can be concluded that culture environment where the sample were collected already existed before the temple was built. Further investigation is still required

  2. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  3. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  4. Application of Tabu Search Algorithm in Job Shop Scheduling

    Directory of Open Access Journals (Sweden)

    Betrianis Betrianis

    2010-10-01

    Full Text Available Tabu Search is one of local search methods which is used to solve the combinatorial optimization problem. This method aimed is to make the searching process of the best solution in a complex combinatorial optimization problem(np hard, ex : job shop scheduling problem, became more effective, in a less computational time but with no guarantee to optimum solution.In this paper, tabu search is used to solve the job shop scheduling problem consists of 3 (three cases, which is ordering package of September, October and November with objective of minimizing makespan (Cmax. For each ordering package, there is a combination for initial solution and tabu list length. These result then  compared with 4 (four other methods using basic dispatching rules such as Shortest Processing Time (SPT, Earliest Due Date (EDD, Most Work Remaining (MWKR dan First Come First Served (FCFS. Scheduling used Tabu Search Algorithm is sensitive for variables changes and gives makespan shorter than scheduling used by other four methods.

  5. AHP 47: A NIGHT DATE

    Directory of Open Access Journals (Sweden)

    Phun tshogs dbang rgyal ཕུན་ཚོགས་དབང་རྒྱལ།

    2017-04-01

    Full Text Available The author was born in 1993 in Ska chung (Gaqun Village, Nyin mtha' (Ningmute Township, Rma lho (Henan Mongolian Autonomous County, Rma lho (Huangnan Tibetan Autonomous Prefecture, Mtsho sngon (Qinghai Province, PR China. Night dating was popular for teenage boys some years ago. They rode horses and yaks when they went night dating. They generally rode yaks, because horses were important for their families and used for such important tasks as pursuing bandits and going to the county town for grain and supplies. An early experience with night dating is described.

  6. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker cons...... consumption and the impact on the remaining network and the customer service level. The model is applied to 4 real cases from Maersk Line. Solutions are comparable or superior to those chosen by operations managers. Cost savings of up to 58% may be achieved.......Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker...

  7. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  8. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  9. Preemptive scheduling in overloaded systems

    Czech Academy of Sciences Publication Activity Database

    Chrobak, M.; Epstein, L.; Noga, J.; Sgall, Jiří; van Stee, R.; Tichý, Tomáš; Vakhania, N.

    2003-01-01

    Roč. 67, č. 1 (2003), s. 183-197 ISSN 0022-0000 R&D Projects: GA ČR GA201/01/1195; GA MŠk ME 476; GA AV ČR IAA1019901; GA MŠk LN00A056 Institutional research plan: CEZ:AV0Z1019905; CEZ:AV0Z1019905 Keywords : scheduling * online algorithms * benefit Subject RIV: BA - General Mathematics Impact factor: 0.795, year: 2003

  10. WCET Analysis for Preemptive Scheduling

    OpenAIRE

    Altmeyer, Sebastian; Gebhard, Gernot

    2008-01-01

    Hard real-time systems induce strict constraints on the timing of the task set. Validation of these timing constraints is thus a major challenge during the design of such a system. Whereas the derivation of timing guarantees must already be considered complex if tasks are running to completion, it gets even more complex if tasks are scheduled preemptively -- especially due to caches, deployed to improve the average performance. In this paper we propose a new method to compu...

  11. Scheduling Maintenance Jobs in Networks

    OpenAIRE

    Abed, Fidaa; Chen, Lin; Disser, Yann; Groß, Martin; Megow, Nicole; Meißner, Julie; Richter, Alexander T.; Rischke, Roman

    2017-01-01

    We investigate the problem of scheduling the maintenance of edges in a network, motivated by the goal of minimizing outages in transportation or telecommunication networks. We focus on maintaining connectivity between two nodes over time; for the special case of path networks, this is related to the problem of minimizing the busy time of machines. We show that the problem can be solved in polynomial time in arbitrary networks if preemption is allowed. If preemption is restricted to integral t...

  12. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  13. Broadcast scheduling for mobile advertising

    OpenAIRE

    De Reyck, B.; Degraeve, Z.

    2003-01-01

    We describe a broadcast scheduling system developed for a precision marketing firm specialized in location-sensitive permission-based mobile advertising using SMS (Short Message Service) text messaging. Text messages containing advertisements were sent to registered customers when they were shopping in one of two shopping centers in the vicinity of London. The ads typically contained a limited-time promotional offer. The company's problem was deciding which ads to send out to which customers ...

  14. Schedule of the nuclear program

    International Nuclear Information System (INIS)

    Heigl, F.

    1977-01-01

    The lecure tries to explain the main phases which must be passed to establish nuclear power plants, the feasibility phase, preconstruction and construction phase. Each phase consists of a lot of activities which are commented. Further the lecture tries to give some ideas of durances and dependence between the phases or activities to get a complete time schedule of the realization of a nuclear power project. (HP) [de

  15. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  16. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  17. 77 FR 67395 - Corrosion-Resistant Carbon Steel Flat Products From Germany and Korea; Revised Schedule for the...

    Science.gov (United States)

    2012-11-09

    ... INTERNATIONAL TRADE COMMISSION [Investigation Nos. 701-TA-350 and 731-TA-616 and 618 (Third Review)] Corrosion-Resistant Carbon Steel Flat Products From Germany and Korea; Revised Schedule for the Subject Reviews AGENCY: United States International Trade Commission. ACTION: Notice. DATES: Effective Date...

  18. Dating the humans by radiocarbon

    International Nuclear Information System (INIS)

    Fedi, M.E.

    2011-01-01

    Radiocarbon has become a very powerful tool used for dating. This paper deals with a specific application of 1 4C i.e. dating of humans. Attention is focused on those aspects that, if neglected, might lead to a misinterpretation of the results or to an unsatisfying accuracy of the measurement. After a brief description of the main principles on which the radiocarbon method is based and of Accelerator Mass Spectrometry, examples taken from the research activity of INFN-LABEC (Laboratorio di Tecniche Nucleari per I Beni Culturali) in Florence are presented. The case of the relic of St. Francis represents an example of dating not directly human remains but other objects that can be associated to them. The case of two burials from the archaeological area of Baratti-Populonia, in Tuscany, gives the possibility to show the importance of estimating the human palaeodiet when dating bone samples.

  19. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  20. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  1. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  2. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  3. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  4. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  5. Organization of the construction and schedule of realization

    International Nuclear Information System (INIS)

    Szerovay, Antal; Vogel, Oszkar

    1988-01-01

    The four units of the Paks nuclear power plant with all the auxiliary and service facilities were constructed between 1974 and 1987. Major features of building activities, types of buildings classified according to the connection between the facility and the technology are listed. Processes and structures applied to the construction of the main reactor building are mentioned emphasizing the importance of up-to-date building methods. To move the large equipment into the reactor building Potain cranes of 400 Mp were used. As a result of adequate schedule the auxiliary buildings could be used as preparatory buildings during the construction of the plant. The energy and material supply, the schedule of the construction works are discussed. (V.N.) 6 refs.; 5 figs

  6. Diversity Controlling Genetic Algorithm for Order Acceptance and Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Cheng Chen

    2014-01-01

    Full Text Available Selection and scheduling are an important topic in production systems. To tackle the order acceptance and scheduling problem on a single machine with release dates, tardiness penalty, and sequence-dependent setup times, in this paper a diversity controlling genetic algorithm (DCGA is proposed, in which a diversified population is maintained during the whole search process through survival selection considering both the fitness and the diversity of individuals. To measure the similarity between individuals, a modified Hamming distance without considering the unaccepted orders in the chromosome is adopted. The proposed DCGA was validated on 1500 benchmark instances with up to 100 orders. Compared with the state-of-the-art algorithms, the experimental results show that DCGA improves the solution quality obtained significantly, in terms of the deviation from upper bound.

  7. Dating by electron paramagnetic resonance

    International Nuclear Information System (INIS)

    Poupeau, G.; Rossi, A.M.

    1984-01-01

    Some natural materials behave like dosimeters in front of the ionizing particle flux coming from environmental radioactivity and the cosmic radiation. This property is used for the dating by Electron Paramagnetic Resonance (EPR). Before presenting the basic principles of the EPR analysis and the dating method which uses such a phenomenous, it is reviewed several types of application currently in course of development. (L.C.) [pt

  8. Radiocarbon dating of lake sediments

    OpenAIRE

    Pocevičius, Matas

    2016-01-01

    Matas Pocevičius, Radiocarbon dating of lake sediments, bachelor thesis, Vilnius University, Faculty of Physics, Department of General Physics and Spectroscopy, physics, Vilnius, 45 p., 2016. The aim of this study is to evaluate the possibility of radiocarbon dating application for Tapeliai lake bottom sediments. The literature review discusses topics related to accelerator mass spectrometry, principles of radiocarbon formation, importance of nuclear fallout for 14C, possible applications of ...

  9. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  10. Radiocarbon dating of iron artefacts

    Energy Technology Data Exchange (ETDEWEB)

    Cresswell, R. [Australian National Univ., Canberra, ACT (Australia). Dept. of Nuclear Physics

    1997-12-31

    Iron artefacts are generally dated by association or on stylistic grounds. This may not give a true indication of the date of manufacture, or may not be possible if the piece is out of context, ambiguous in style, or a copy. Obtaining a direct date on the artefact would be preferable. During the processes of manufacture, carbon is incorporated into the iron from the fuel source. If the fuel is of a material containing contemporaneous carbon, i.e. has an ambient radiocarbon signature, e.g. charcoal, then we may reliably radiocarbon date the artefact by extracting this carbon. Care must be taken, however, to ensure that re-working has not introduced multiple sources of carbon that would give an erroneous date. Detailed chemical analysis must precede radiocarbon analysis. Sample size is determined by carbon content, and before the advent of accelerator mass spectrometry, several tens of grams of carbon were required for radiocarbon dating (van der Merwe, 1969), prohibiting this method except for high-carbon cast-irons and bulk samples, e.g. caches of nails. AMS permits the analysis of sub-gram pieces of iron (Cresswell, 1991), thereby permitting the analysis of museum pieces with only minimal loss of material, and small fragments of iron recovered from archaeological sites. A few examples are given to illustrate these points. Paper no. 41; Extended abstract. 6 refs.

  11. Radiocarbon dating of iron artefacts

    International Nuclear Information System (INIS)

    Cresswell, R.

    1997-01-01

    Iron artefacts are generally dated by association or on stylistic grounds. This may not give a true indication of the date of manufacture, or may not be possible if the piece is out of context, ambiguous in style, or a copy. Obtaining a direct date on the artefact would be preferable. During the processes of manufacture, carbon is incorporated into the iron from the fuel source. If the fuel is of a material containing contemporaneous carbon, i.e. has an ambient radiocarbon signature, e.g. charcoal, then we may reliably radiocarbon date the artefact by extracting this carbon. Care must be taken, however, to ensure that re-working has not introduced multiple sources of carbon that would give an erroneous date. Detailed chemical analysis must precede radiocarbon analysis. Sample size is determined by carbon content, and before the advent of accelerator mass spectrometry, several tens of grams of carbon were required for radiocarbon dating (van der Merwe, 1969), prohibiting this method except for high-carbon cast-irons and bulk samples, e.g. caches of nails. AMS permits the analysis of sub-gram pieces of iron (Cresswell, 1991), thereby permitting the analysis of museum pieces with only minimal loss of material, and small fragments of iron recovered from archaeological sites. A few examples are given to illustrate these points

  12. Microscale radiocarbon dating of paintings

    International Nuclear Information System (INIS)

    Hendriks, Laura; Hajdas, Irka; McIntyre, Cameron; Kueffner, Markus; Ferreira, Ester S.B.; Scherrer, Nadim C.

    2016-01-01

    In this paper, radiocarbon dating of paintings using minimal sample sizes has been investigated, in an effort to address the problem of limited access to sample material in paintings. 14 C analyses were conducted on signed and dated paintings from two Swiss artists of the twentieth century. The selected paintings dated from the 1930s and 1960s, provided the opportunity to evaluate the dating accuracy on paintings realized before and after 1950 AD when the 14 C bomb peak was created, as a result of the nuclear tests conducted in the 1950/1960s. The work focused on the one hand on minimizing the size of the canvas sample required for accelerator mass spectrometer radiocarbon measurement on the gas ion source of the MICADAS and, on the other hand, on testing the possibility of dating the organic binder of the paint. Following careful characterization of the paint composition by X-ray fluorescence spectroscopy, Fourier transformed infrared spectroscopy, and Raman spectroscopy, paints containing no other carbon source than the natural organic binder were identified and dated. (orig.)

  13. Direct dating of human fossils.

    Science.gov (United States)

    Grün, Rainer

    2006-01-01

    The methods that can be used for the direct dating of human remains comprise of radiocarbon, U-series, electron spin resonance (ESR), and amino acid racemization (AAR). This review gives an introduction to these methods in the context of dating human bones and teeth. Recent advances in ultrafiltration techniques have expanded the dating range of radiocarbon. It now seems feasible to reliably date bones up to 55,000 years. New developments in laser ablation mass spectrometry permit the in situ analysis of U-series isotopes, thus providing a rapid and virtually non-destructive dating method back to about 300,000 years. This is of particular importance when used in conjunction with non-destructive ESR analysis. New approaches in AAR analysis may lead to a renaissance of this method. The potential and present limitations of these direct dating techniques are discussed for sites relevant to the reconstruction of modern human evolution, including Florisbad, Border Cave, Tabun, Skhul, Qafzeh, Vindija, Banyoles, and Lake Mungo. (c) 2006 Wiley-Liss, Inc.

  14. Microscale radiocarbon dating of paintings

    Energy Technology Data Exchange (ETDEWEB)

    Hendriks, Laura; Hajdas, Irka; McIntyre, Cameron [ETH Zurich, Ion Beam Physics, Zurich (Switzerland); Kueffner, Markus; Ferreira, Ester S.B. [SIK-ISEA, Zurich, Zurich (Switzerland); Scherrer, Nadim C. [Bern University of Applied Sciences, HKB, Bern (Switzerland)

    2016-03-15

    In this paper, radiocarbon dating of paintings using minimal sample sizes has been investigated, in an effort to address the problem of limited access to sample material in paintings. {sup 14}C analyses were conducted on signed and dated paintings from two Swiss artists of the twentieth century. The selected paintings dated from the 1930s and 1960s, provided the opportunity to evaluate the dating accuracy on paintings realized before and after 1950 AD when the {sup 14}C bomb peak was created, as a result of the nuclear tests conducted in the 1950/1960s. The work focused on the one hand on minimizing the size of the canvas sample required for accelerator mass spectrometer radiocarbon measurement on the gas ion source of the MICADAS and, on the other hand, on testing the possibility of dating the organic binder of the paint. Following careful characterization of the paint composition by X-ray fluorescence spectroscopy, Fourier transformed infrared spectroscopy, and Raman spectroscopy, paints containing no other carbon source than the natural organic binder were identified and dated. (orig.)

  15. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  16. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  17. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  18. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  19. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  20. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  1. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  2. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  3. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  4. Multi-objective group scheduling optimization integrated with preventive maintenance

    Science.gov (United States)

    Liao, Wenzhu; Zhang, Xiufang; Jiang, Min

    2017-11-01

    This article proposes a single-machine-based integration model to meet the requirements of production scheduling and preventive maintenance in group production. To describe the production for identical/similar and different jobs, this integrated model considers the learning and forgetting effects. Based on machine degradation, the deterioration effect is also considered. Moreover, perfect maintenance and minimal repair are adopted in this integrated model. The multi-objective of minimizing total completion time and maintenance cost is taken to meet the dual requirements of delivery date and cost. Finally, a genetic algorithm is developed to solve this optimization model, and the computation results demonstrate that this integrated model is effective and reliable.

  5. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  6. Linguistic Dating of Biblical Texts

    DEFF Research Database (Denmark)

    Ehrensvärd, Martin Gustaf

    2003-01-01

    For two centuries, scholars have pointed to consistent differences in the Hebrew of certain biblical texts and interpreted these differences as reflecting the date of composition of the texts. Until the 1980s, this was quite uncontroversial as the linguistic findings largely confirmed the chronol......For two centuries, scholars have pointed to consistent differences in the Hebrew of certain biblical texts and interpreted these differences as reflecting the date of composition of the texts. Until the 1980s, this was quite uncontroversial as the linguistic findings largely confirmed...... the chronology of the texts established by other means: the Hebrew of Genesis-2 Kings was judged to be early and that of Esther, Daniel, Ezra, Nehemiah, and Chronicles to be late. In the current debate where revisionists have questioned the traditional dating, linguistic arguments in the dating of texts have...... come more into focus. The study critically examines some linguistic arguments adduced to support the traditional position, and reviewing the arguments it points to weaknesses in the linguistic dating of EBH texts to pre-exilic times. When viewing the linguistic evidence in isolation it will be clear...

  7. Optimizing Unmanned Aircraft System Scheduling

    Science.gov (United States)

    2008-06-01

    ASC-U uses a deterministic algorithm to optimize over a given finite time horizon to obtain near-optimal UAS mission area assignments. ASC-U...the details of the algorithm . We set an upper bound on the total number of schedules that can be generated, so as not to create unsolvable ILPs. We...COL_MISSION_NAME)) If Trim( CStr (rMissions(iRow, COL_MISSION_REQUIRED))) <> "" Then If CLng(rMissions(iRow, COL_MISSION_REQUIRED)) > CLng

  8. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  9. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  10. The scheduling of repeat cesarean section operations: prospective management protocol experience.

    Science.gov (United States)

    Read, J A

    1985-03-01

    There are benefits to patients and a busy obstetric service if repeat cesarean section operations are performed on a scheduled basis. Optimum management avoids prematurity and reduces the need for amniocentesis. Over a period of 20 months repeat cesarean sections were performed at Tripler Army Medical Center while a protocol with the following elements was used: (1) known last menstrual period; (2) landmarks: positive urine human chorionic gonadotropin test by 6 weeks, Doppler fetal heart tone by 12 weeks, date determination by examination before 10 weeks, fetoscope fetal heart tone by 20 weeks, and date determination by size before 30 weeks; (3) date determination by midtrimester sonogram(s); (4) normal third-trimester glucose screening; (5) biparietal diameter of 9.2 or 9.5 cm before scheduling. With two or more clinical landmarks and one date by sonogram or one landmark and date by two sonograms, elective repeat cesarean section was scheduled at 39 weeks if the biparietal diameter was greater than or equal to 9.2 cm (127). If dates by sonogram were less than dates by last menstrual period but greater than 1 week or if last menstrual period was unknown, dates by sonogram and landmarks corresponding to dates by sonogram were used to electively schedule, with biparietal diameters of 9.2 or 9.5 cm respectively required (28). If protocol criteria were not met or earlier delivery was indicated (e.g., vertical scar or diabetes), amniocentesis was performed (42), except when not possible, advisable, or refused when patients either elected labor (20) or were scheduled if three or more criteria for 40+ weeks were met (18). Of 225 patients (70.5%) scheduled by protocol (173), amniocentesis (34), or medical indication (18), 188 (58.9%) were delivered without labor. In the 147 patients (46.1%) delivered electively by protocol without labor or amniocentesis, there were no cases of respiratory distress syndrome and the mean birth weight was 3517 gm. With early care and better

  11. Kimberley rock art dating project

    International Nuclear Information System (INIS)

    Walsh, G.L.; Morwood, M.

    1997-01-01

    The art's additional value, unequalled by traditionally recognised artefacts, is its permanent pictorial documentation presenting a 'window' into the otherwise intangible elements of perceptions, vision and mind of pre-historic cultures. Unfortunately it's potential in establishing Kimberley archaeological 'big picture' still remains largely unrecognised. Some of findings of the Kimberley Rock Art Dating Project, using AMS and optical stimulated luminescence (OSL) dating techniques, are outlined. It is estimated that these findings will encourage involvement by a greater diversity of specialist disciplines to tie findings into levels of this art sequence as a primary reference point. The sequence represents a sound basis for selecting specific defined images for targeting detailed studies by a range of dating technique. This effectively removes the undesirable ad hoc sampling of 'apparently old paintings'; a process which must unavoidably remain the case with researchers working on most global bodies of rock art

  12. ESR dating of fault rocks

    International Nuclear Information System (INIS)

    Lee, Hee Kwon

    2002-03-01

    Past movement on faults can be dated by measurement of the intensity of ESR signals in quartz. These signals are reset by local lattice deformation and local frictional heating on grain contacts at the time of fault movement. The ESR signals then trow back as a result of bombardment by ionizing radiation from surrounding rocks. The age is obtained from the ratio of the equivalent dose, needed to produce the observed signal, to the dose rate. Fine grains are more completely reset during faulting, and a plot of age vs grain size shows a plateau for grains below critical size : these grains are presumed to have been completely zeroed by the last fault activity. We carried out ESR dating of fault rocks collected from the Yangsan fault system. ESR dates from the this fault system range from 870 to 240 ka. Results of this research suggest that long-term cyclic fault activity continued into the pleistocene

  13. ESR dating of fault rocks

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hee Kwon [Kangwon National Univ., Chuncheon (Korea, Republic of)

    2002-03-15

    Past movement on faults can be dated by measurement of the intensity of ESR signals in quartz. These signals are reset by local lattice deformation and local frictional heating on grain contacts at the time of fault movement. The ESR signals then trow back as a result of bombardment by ionizing radiation from surrounding rocks. The age is obtained from the ratio of the equivalent dose, needed to produce the observed signal, to the dose rate. Fine grains are more completely reset during faulting, and a plot of age vs grain size shows a plateau for grains below critical size : these grains are presumed to have been completely zeroed by the last fault activity. We carried out ESR dating of fault rocks collected from the Yangsan fault system. ESR dates from the this fault system range from 870 to 240 ka. Results of this research suggest that long-term cyclic fault activity continued into the pleistocene.

  14. 77 FR 38775 - Schedules for Atlantic Shark Identification Workshops and Protected Species Safe Handling...

    Science.gov (United States)

    2012-06-29

    ..., 2012, in Rosenberg, TX, has been changed to August 16, 2012. This workshop notice originally published... & Suites, 28332 SW Freeway 59, Rosenberg, TX 77471. The July and September workshop dates remain unchanged... Atlantic Shark Identification Workshop scheduled for August 9, 2012, in Rosenberg, TX, has been rescheduled...

  15. 75 FR 75695 - Certain Footwear: Recommendations for Modifying the Harmonized Tariff Schedule of the United States

    Science.gov (United States)

    2010-12-06

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 1205-8 (Addendum)] Certain Footwear.... 1205-8, Certain Footwear: Recommendations for Modifying the Harmonized Tariff Schedule of the United... addition of new tariff lines applicable to the subject footwear. DATES: December 22, 2010: Deadline for...

  16. 32Si dating of sediments

    International Nuclear Information System (INIS)

    Morgenstern, U.

    2004-01-01

    Brief explanation of the use of 32 Si in the dating of sediments. 32 Si , with a half-life of c.140 years, can be applied in the age range 30-1000 years. An appropriate dating tool for that time range is essential because it includes three very important epochs: the impact of human colonisation and industrialisation during the last 150 years, the Little Ice Age between about 1650 AD and 1850 AD, and the last part of the Medieval Climatic Optimum. 23 refs

  17. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  18. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  19. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  20. 75 FR 5620 - New Date for April 2010 Customs Brokers License Examination

    Science.gov (United States)

    2010-02-03

    ... types of infractions. In the case of an applicant for an individual broker's license, section 641... regularly scheduled examination date conflicts with a national holiday, religious observance, or other... (April 5) coincides with the observance of Passover. In consideration of this conflict with Passover, CBP...

  1. 77 FR 39502 - New Date for the October 2012 Customs Broker License Examination

    Science.gov (United States)

    2012-07-03

    ... specified types of infractions. This section also provides that an examination may be conducted to assess an... unless the regularly scheduled examination date conflicts with a national holiday, religious observance... observance of the religious holiday, Sukkot. In consideration of this conflict, CBP has decided to change the...

  2. 76 FR 29750 - Filing Dates for the Nevada Special Election in the 2nd Congressional District

    Science.gov (United States)

    2011-05-23

    ... 2nd Congressional District AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY: Nevada has scheduled a Special General Election on September 13, 2011, to fill... Heller. Committees required to file reports in connection with the Special General Election on September...

  3. 75 FR 10483 - Filing Dates for the Pennsylvania Special Election in the 12th Congressional District

    Science.gov (United States)

    2010-03-08

    ... in the 12th Congressional District AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY: Pennsylvania has scheduled a Special General Election on May 18... John P. Murtha. Committees required to file reports in connection with the Special General Election on...

  4. 75 FR 17742 - Filing Dates for the Georgia Special Election in the 9th Congressional District

    Science.gov (United States)

    2010-04-07

    ... 9th Congressional District AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY: Georgia has scheduled a special general election on May 11, 2010, to fill the U... participate in the Georgia Special General and Special Runoff Elections shall file a 12-day Pre-General Report...

  5. 75 FR 34450 - Filing Dates for the Indiana Special Election in the 3rd Congressional District

    Science.gov (United States)

    2010-06-17

    ... 3rd Congressional District AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY: Indiana has scheduled a Special General Election on November 2, 2010, to fill.... Committees required to file reports in connection with the Special General Election on November 2, 2010...

  6. 77 FR 56208 - Filing Dates for the Kentucky Special Election in the 4th Congressional District

    Science.gov (United States)

    2012-09-12

    ... 4th Congressional District AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY: Kentucky has scheduled a general election on November 6, 2012, to fill the U.S... required to file reports in connection with the Special General Election on November 6, 2012, shall file a...

  7. 78 FR 53454 - Filing Dates for the Louisiana Special Elections in the 5th Congressional District

    Science.gov (United States)

    2013-08-29

    ... the 5th Congressional District AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY: Louisiana has scheduled a Special General Election on October 19, 2013, to fill... Special General and Special Runoff Elections shall file a 12-day Pre-General Report on October 7, 2013; a...

  8. 76 FR 17124 - Filing Dates for the California Special Election in the 36th Congressional District

    Science.gov (United States)

    2011-03-28

    ... the 36th Congressional District AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY: California has scheduled a special general election on May 17, 2011, to... committees of candidates who participate in the California Special General and Special Runoff Elections shall...

  9. 75 FR 12544 - Filing Dates for the Hawaii Special Election In the 1st Congressional District

    Science.gov (United States)

    2010-03-16

    ... 1st Congressional District AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY: Hawaii has scheduled a Special General Election on May 22, 2010, to fill the U.... Committees required to file reports in connection with the Special General Election on May 22, 2010, shall...

  10. 78 FR 9916 - Filing Dates for the Missouri Special Election in the 8th Congressional District

    Science.gov (United States)

    2013-02-12

    ... 8th Congressional District AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY: Missouri has scheduled a Special General Election on June 4, 2013, to fill the.... Committees required to file reports in connection with the Special General Election on June 4, 2013, shall...

  11. Variable Neighborhood Search for Parallel Machines Scheduling Problem with Step Deteriorating Jobs

    Directory of Open Access Journals (Sweden)

    Wenming Cheng

    2012-01-01

    Full Text Available In many real scheduling environments, a job processed later needs longer time than the same job when it starts earlier. This phenomenon is known as scheduling with deteriorating jobs to many industrial applications. In this paper, we study a scheduling problem of minimizing the total completion time on identical parallel machines where the processing time of a job is a step function of its starting time and a deteriorating date that is individual to all jobs. Firstly, a mixed integer programming model is presented for the problem. And then, a modified weight-combination search algorithm and a variable neighborhood search are employed to yield optimal or near-optimal schedule. To evaluate the performance of the proposed algorithms, computational experiments are performed on randomly generated test instances. Finally, computational results show that the proposed approaches obtain near-optimal solutions in a reasonable computational time even for large-sized problems.

  12. Machine scheduling to minimize weighted completion times the use of the α-point

    CERN Document Server

    Gusmeroli, Nicoló

    2018-01-01

    This work reviews the most important results regarding the use of the α-point in Scheduling Theory. It provides a number of different LP-relaxations for scheduling problems and seeks to explain their polyhedral consequences. It also explains the concept of the α-point and how the conversion algorithm works, pointing out the relations to the sum of the weighted completion times. Lastly, the book explores the latest techniques used for many scheduling problems with different constraints, such as release dates, precedences, and parallel machines. This reference book is intended for advanced undergraduate and postgraduate students who are interested in scheduling theory. It is also inspiring for researchers wanting to learn about sophisticated techniques and open problems of the field.

  13. Recent advances in thermoluminescence dating

    International Nuclear Information System (INIS)

    Aitken, M.J.

    1984-01-01

    Initially the application of thermoluminescent dating was to ancient pottery and other baked clay, the detection of forgeries in art ceramics having a particularly powerful impact. In recent years there has been a growing extension of TL into non-pottery materials. Heated flints from paleolithic fire-places is one application. Another is in the dating of igneous rocks from recent volcanic events; formerly this had been impossible on account of the malign phenomenon of non-thermal ('anomalous') fading exhibited by volcanic minerals but this is now being circumvented by utilising TL in the 600 0 C region of the glow curve. TL dating has also been extended to unburnt calcite, one application being stalagmitic floors in paleolithic caves. Another recent development is the use of TL for dating aeolian sediment and some types of waterborne sediment. These developments give prospect of establishing a TL-based chronology, both for archaeology and quaternary research, extending back well beyond the range of radiocarbon, perhaps reaching a million years ago. (author)

  14. Sexual Intimacy in Dating Relationships

    Science.gov (United States)

    Peplau, Letitia Anne; And Others

    1977-01-01

    The patterning of sexual interaction in male-female dyads and the links between sexual behavior and emotional intimacy were investigated as part of a two-year study of college dating couples. Traditional sexual role playing was found to be common. (Author/AM)

  15. Online Dating and Conjugal Bereavement

    Science.gov (United States)

    Young, Dannagal Goldthwaite; Caplan, Scott E.

    2010-01-01

    This study examined self-presentation in the online dating profiles of 241 widowed and 280 divorced individuals between 18 and 40 years old. A content analysis of open-ended user-generated profiles assessed the presence or absence of various themes, including the user's marital status, the backstory of their lost relationship, and whether they…

  16. (including travel dates) Proposed itinerary

    Indian Academy of Sciences (India)

    Ashok

    31 July to 22 August 2012 (including travel dates). Proposed itinerary: Arrival in Bangalore on 1 August. 1-5 August: Bangalore, Karnataka. Suggested institutions: Indian Institute of Science, Bangalore. St Johns Medical College & Hospital, Bangalore. Jawaharlal Nehru Centre, Bangalore. 6-8 August: Chennai, TN.

  17. Comparative study of radioimmunoassay dates

    International Nuclear Information System (INIS)

    Venegas Sanchez, Ruth.

    1986-01-01

    The radioimmunoassay is frequently used in clinical chemistry for the concentration determination of several substances like hormones as thyrotropine and thyroxine. In this experiment the dates of tyroxine radioimmunoassay are processed by three methods: a) like the recommendation of the IAEA, b) Dr. G. Chase method, c) according to the provider. The best method was Dr. Chase's. (author)

  18. Peer Group Influences on Adolescent Dating Aggression

    Science.gov (United States)

    Connolly, Jennifer; Friedlander, Laura

    2009-01-01

    The peer group is a critical social context for dating and romantic relationships. Peer groups provide opportunities to meet potential dating partners and set norms for acceptable dating behaviors. This article explores how peer groups influence dating and dating aggression, as well as how they can be used in prevention efforts. It also reviews…

  19. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  20. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  1. The CHI 2013 interactive schedule

    DEFF Research Database (Denmark)

    Satyanarayan, Arvind; Strazzulla, Daniel; Klokmose, Clemens Nylandsted

    2013-01-01

    CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event is availa......CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event...... is available. The CHI'13 Interactive Schedule helps attendees navigate this wealth of video content in order to identify events they would like to attend. It consists of a number of large display screens throughout the conference venue which cycle through a video playlist of events. Attendees can interact...

  2. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  3. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  4. 31 CFR 596.302 - Effective date.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.302 Effective date. The term effective date refers to the effective date of the...

  5. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  6. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  7. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  8. Management of Temporal Constraints for Factory Scheduling.

    Science.gov (United States)

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  9. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  10. Trustable Virtual Machine Scheduling in a Cloud

    OpenAIRE

    Hermenier , Fabien; Henrio , Ludovic

    2017-01-01

    International audience; In an Infrastructure As A Service (IaaS) cloud, the scheduler deploys VMs to servers according to service level objectives (SLOs). Clients and service providers must both trust the infrastructure. In particular they must be sure that the VM scheduler takes decisions that are consistent with its advertised behaviour. The difficulties to master every theoretical and practical aspects of a VM scheduler implementation leads however to faulty behaviours that break SLOs and ...

  11. Flow shop scheduling with heterogeneous workers

    OpenAIRE

    Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier

    2014-01-01

    We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is motivated by Sheltered Work centers for Disabled, whose main objective is the labor integration of persons with disabilities, an important aim not only for these centers but for any company d...

  12. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  13. LEARNING SCHEDULER PARAMETERS FOR ADAPTIVE PREEMPTION

    OpenAIRE

    Prakhar Ojha; Siddhartha R Thota; Vani M; Mohit P Tahilianni

    2015-01-01

    An operating system scheduler is expected to not allow processor stay idle if there is any process ready or waiting for its execution. This problem gains more importance as the numbers of processes always outnumber the processors by large margins. It is in this regard that schedulers are provided with the ability to preempt a running process, by following any scheduling algorithm, and give us an illusion of simultaneous running of several processes. A process which is allowed t...

  14. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  15. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  16. The spirit of St. Lucie: nuclear plant built on schedule

    International Nuclear Information System (INIS)

    Derrickson, W.B.

    1984-01-01

    Florida Power and Light Company currently has four nuclear units in operation with St. Lucie Unit 2 being the last to receive an operating license in June, 1983. It's sister Unit 1 received its license in 1976 and has, through 1982, compiled one of the best operating records in the United States. The full power license for St. Lucie Unit 2 was received from the Nuclear Regulatory Commission (NRC) on June 10, 1983, just six years after construction began. The industry average for construction of nuclear plants in this time period is about 10 years. The success of the St. Lucie Unit 2 project can be at least in part attributed to planning the work, accurate and timely reporting of results via valid indicators, well trained and skilled personnel, and most of all, teamwork. During the course of the project the plant was constantly on or near schedule and always ahead of industry averages. This was done despite issuance of numerous regulations by the NRC (TMI), a 1979 hurricane which did considerable damage to the Reactor Auxiliary Building, labor problems, and an NRC schedule review team that determined the best that could be done was to complete the plant a year later. The final price tag is about $1.42 billion, including ''allowance for funds used during construction''. In operation to date the post core loading test program has been completed in less than two months, enabling the plant to be put into commercial operation only two months after its original scheduled date of May 28, 1983exclamation

  17. Linguistic dating of biblical texts

    DEFF Research Database (Denmark)

    Young, Ian; Rezetko, Robert; Ehrensvärd, Martin Gustaf

    Since the beginning of critical scholarship biblical texts have been dated using linguistic evidence. In recent years this has become a controversial topic, especially with the publication of Ian Young (ed.), Biblical Hebrew: Studies in Chronology and Typology (2003). However, until now there has...... been no introduction and comprehensive study of the field. Volume 1 introduces the field of linguistic dating of biblical texts, particularly to intermediate and advanced students of biblical Hebrew who have a reasonable background in the language, having completed at least an introductory course...... in this volume are: What is it that makes Archaic Biblical Hebrew archaic , Early Biblical Hebrew early , and Late Biblical Hebrew late ? Does linguistic typology, i.e. different linguistic characteristics, convert easily and neatly into linguistic chronology, i.e. different historical origins? A large amount...

  18. Cloud Service Scheduling Algorithm Research and Optimization

    Directory of Open Access Journals (Sweden)

    Hongyan Cui

    2017-01-01

    Full Text Available We propose a cloud service scheduling model that is referred to as the Task Scheduling System (TSS. In the user module, the process time of each task is in accordance with a general distribution. In the task scheduling module, we take a weighted sum of makespan and flowtime as the objective function and use an Ant Colony Optimization (ACO and a Genetic Algorithm (GA to solve the problem of cloud task scheduling. Simulation results show that the convergence speed and output performance of our Genetic Algorithm-Chaos Ant Colony Optimization (GA-CACO are optimal.

  19. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  20. 15 CFR 700.14 - Preferential scheduling.

    Science.gov (United States)

    2010-01-01

    ...) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Industrial Priorities § 700.14 Preferential scheduling. (a) A...

  1. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  2. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  3. Fission tracks dating for obsidian

    International Nuclear Information System (INIS)

    Picon, C.

    1991-01-01

    Obsidian from South America are dated by fission tracks methods. Samples are irradiated in a nuclear reactor with a flux of 10 15 n/cm 2 . Results, corrected by 'Plateau' methods, are the following: obsidian from Bolivia: 4.14 x 10 6 yr., Ecuador: 8.79 x 10 5 yr., Colombia: 3.52 x 10 6 yr., Peru: 6.55 x 10 6 yr., Chile: 1.13 x 10 6 yr. (MMZ). 5 refs., 3 tabs

  4. Radiokrypton dating coming of age

    Institute of Scientific and Technical Information of China (English)

    Zheng-Tian Lu

    2016-01-01

    The dream of radiokrypton dating began in 1969 when Heinz Hugo Loosli and Hans Oeschger of the University of Bern first detected the decay of81Rr(half-life=230 000 yr)in krypton gas extracted from air[1].This isotope is produced in the upper atmosphere by cosmic-ray-induced spallation and neutron-activation of stable krypton.Due to its long residence time(105 yr)in the atmosphere,81Rr is uniformly

  5. Current topics in ESR dating

    International Nuclear Information System (INIS)

    Skinner, Anne R.

    2011-01-01

    After over 25 years, the use of electron spin resonance (ESR) is well-established in dating sites of geological, paleontological and archaeological interest. Like any scientific technique, there have been changes in understanding and in methodology. Improvements have not, however, changed the observation that external dose calculations are still a significant source of uncertainty in ages. Examples from Europe, Africa and the Americans illustrate this point. For Pradayrol Cave (France), the occupation age, 330 ka, is unchallenged, making this the oldest known Neanderthal site in France. For Roc de Marsal, also in France, on the other hand, discrepancies between TL and sedimentary dose rates imply substantial differences in interpretation. In the Western Egyptian Desert, where artifacts and datable material are not well-correlated, the dating results show consistency with expectations based on global climate change, even in deflated sites. Climate change is also the question in geological studies in the Bahamas where, despite concerns about cosmic dose history, ESR dates confirm other evidence for sea level changes. We show that an uncertain age is not the same as an impossible one.

  6. ESR dating of fault rocks

    International Nuclear Information System (INIS)

    Lee, Hee Kwon

    2003-02-01

    Past movement on faults can be dated by measurement of the intensity of ESR signals in quartz. These signals are reset by local lattice deformation and local frictional heating on grain contacts at the time of fault movement. The ESR signals then grow back as a result of bombardment by ionizing radiation from surrounding rocks. The age is obtained from the ratio of the equivalent dose, needed to produce the observed signal, to the dose rate. Fine grains are more completely reset during faulting, and a plot of age vs. grain size shows a plateau for grains below critical size; these grains are presumed to have been completely zeroed by the last fault activity. We carried out ESR dating of fault rocks collected near the Gori nuclear reactor. Most of the ESR signals of fault rocks collected from the basement are saturated. This indicates that the last movement of the faults had occurred before the Quaternary period. However, ESR dates from the Oyong fault zone range from 370 to 310 ka. Results of this research suggest that long-term cyclic fault activity of the Oyong fault zone continued into the Pleistocene

  7. ESR dating of fault rocks

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hee Kwon [Kangwon National Univ., Chuncheon (Korea, Republic of)

    2003-02-15

    Past movement on faults can be dated by measurement of the intensity of ESR signals in quartz. These signals are reset by local lattice deformation and local frictional heating on grain contacts at the time of fault movement. The ESR signals then grow back as a result of bombardment by ionizing radiation from surrounding rocks. The age is obtained from the ratio of the equivalent dose, needed to produce the observed signal, to the dose rate. Fine grains are more completely reset during faulting, and a plot of age vs. grain size shows a plateau for grains below critical size; these grains are presumed to have been completely zeroed by the last fault activity. We carried out ESR dating of fault rocks collected near the Gori nuclear reactor. Most of the ESR signals of fault rocks collected from the basement are saturated. This indicates that the last movement of the faults had occurred before the Quaternary period. However, ESR dates from the Oyong fault zone range from 370 to 310 ka. Results of this research suggest that long-term cyclic fault activity of the Oyong fault zone continued into the Pleistocene.

  8. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  9. Updating Linear Schedules with Lowest Cost: a Linear Programming Model

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Many civil engineering projects involve sets of tasks repeated in a predefined sequence in a number of work areas along a particular route. A useful graphical representation of schedules of such projects is time-distance diagrams that clearly show what process is conducted at a particular point of time and in particular location. With repetitive tasks, the quality of project performance is conditioned by the ability of the planner to optimize workflow by synchronizing the works and resources, which usually means that resources are planned to be continuously utilized. However, construction processes are prone to risks, and a fully synchronized schedule may expire if a disturbance (bad weather, machine failure etc.) affects even one task. In such cases, works need to be rescheduled, and another optimal schedule should be built for the changed circumstances. This typically means that, to meet the fixed completion date, durations of operations have to be reduced. A number of measures are possible to achieve such reduction: working overtime, employing more resources or relocating resources from less to more critical tasks, but they all come at a considerable cost and affect the whole project. The paper investigates the problem of selecting the measures that reduce durations of tasks of a linear project so that the cost of these measures is kept to the minimum and proposes an algorithm that could be applied to find optimal solutions as the need to reschedule arises. Considering that civil engineering projects, such as road building, usually involve less process types than construction projects, the complexity of scheduling problems is lower, and precise optimization algorithms can be applied. Therefore, the authors put forward a linear programming model of the problem and illustrate its principle of operation with an example.

  10. Do Projects really end late? On the shortcomings of the classical scheduling techniques

    Directory of Open Access Journals (Sweden)

    Pablo Ballesteros-Pérez

    2018-03-01

    Full Text Available Many engineering projects fail to meet their planned completion dates in real practice. This a recurrent topic in the project management literature, with poor planning and controlling practices frequently cited among the most significant causes of delays. Unfortunately, hardly any attention has been paid to the fact that the classical scheduling techniques: Gantt chart, Critical Path Method (CPM, and Program Evaluation and Review Technique (PERT, may not be as fit for purpose as they seem. Arguably, because of their relative simplicity, these techniques are still almost the only ones taught nowadays in most introductory courses to scheduling in many engineering and management degrees. However, by utterly ignoring or inappropriately dealing with activity duration variability, these techniques provide optimistic completion dates, while suffering from other shortcomings. Through a series of simple case studies that can be developed with a few participants and common dice, a systematic critique of the classical scheduling techniques is offered. Discussion of the case studies results illustrate why limiting the contents of scheduling education and teaching can be detrimental, as the aforementioned classical scheduling techniques cannot not provide project managers with sufficient resources to effectively plan and control real projects.

  11. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  12. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  13. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  14. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  15. A dynamic approach to vehicle scheduling

    NARCIS (Netherlands)

    D. Huisman (Dennis); R. Freling (Richard); A.P.M. Wagelmans (Albert)

    2001-01-01

    textabstractThis paper presents a dynamic approach to the vehicle scheduling problem. We discuss the potential benefit of our approach compared to the traditional one, where the vehicle scheduling problem is solved only once for a whole period and the travel times are assumed to be fixed. In our

  16. State Teacher Salary Schedules. Policy Analysis

    Science.gov (United States)

    Griffith, Michael

    2016-01-01

    In the United States most teacher compensation issues are decided at the school district level. However, a group of states have chosen to play a role in teacher pay decisions by instituting statewide teacher salary schedules. Education Commission of the States has found that 17 states currently make use of teacher salary schedules. This education…

  17. Evolutionary Scheduler for the Deep Space Network

    Science.gov (United States)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  18. Decay-usage scheduling in multiprocessors

    NARCIS (Netherlands)

    Epema, D.H.J.

    1998-01-01

    Decay-usage scheduling is a priority-aging time-sharing scheduling policy capable of dealing with a workload of both interactive and batch jobs by decreasing the priority of a job when it acquires CPU time, and by increasing its priority when it does not use the (a) CPU. In this article we deal with

  19. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... domestic law and international conventions and agreements adopted by the United States; such terminal... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  20. 21 CFR 1308.13 - Schedule III.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III. 1308.13 Section 1308.13 Food and... opposite it. (b) Stimulants. Unless specifically excepted or unless listed in another schedule, any... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical...

  1. Management Matters. Changing to Flexible Scheduling

    Science.gov (United States)

    Pappas, Marjorie L.

    2005-01-01

    Elementary school library media specialists state that one of the most frustrating issues they face is the fixed schedules in their library media centers. Beyond the cost effectiveness issue, the fixed schedule severely limits using the resources of the library media center for inquiry learning and collaborative teaching experiences between the…

  2. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  3. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  4. A Study on the Optimum Bucket Size for Master Scheduling : For the Case of Hierarchically tured Products

    OpenAIRE

    木内, 正光

    2010-01-01

    The function of master scheduling is to plan the flow of order from its arrival to its completion. In this study, the problem of bucket size for master scheduling is taken up. The bucket size for master scheduling has much influence on the lead time of the order. However, to date there is no clear method for how to set the optimum bucket size. The purpose of this study is to propose a method to set the optimum bucket size. In this paper, an equation to estimate the optimum bucket size is prop...

  5. School Counselors' Role in Dating Violence Intervention

    Science.gov (United States)

    Craigen, Laurie M.; Sikes, April; Healey, Amanda; Hays, Danica

    2009-01-01

    Dating violence among adolescents is a major public health concern. The purpose of this paper is to examine five factors of which school counselors must be aware in order to recognize, intervene, and report incidence of dating violence. These factors are (a) understanding the diverse definitions of dating violence, (b) recognizing dating violence…

  6. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction and Schedule After nearly seven months of concentrated effort, the installation of services on YB0 moved off the CMS critical path in late November. In line with v36 planning provisions, the additional time needed to finish this challeng¬ing task was accommodated by reducing sequential dependencies between assembly tasks, putting more tasks (especially heavy logistic movements) in parallel with activities on, or within, the central wheel. Thus the lowering of wheels YB-1 and YB -2 and of disk YE-3 is already complete, the latter made possible, in the shadow of YB0 work, by inverting the order of the 3 endcap disks in the surface building. Weather conditions permitting, the Tracker will be transported to point 5 during CMS week for insertion in EB before CERN closes. The lowering of the last two disks will take place mid- and end-of January, respectively. Thus central beampipe installation can be confidently planned to start in February as foreseen, allowing closure of CMS in time for CRA...

  7. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Despite the holiday season affecting available manpower, many key internal milestones have been passed over the summer, thanks to the dedication and commitment of the team at point 5. In particular, the installation on, and within, YB0 has progressed steadily through several potentially difficult phases. The v36 planning contingency of lowering YB-1 and YB-1 wheels on schedule in October, before Tracker installation, will be executed in order to give more time to complete YB0 services work, whilst still being consistent with completion of heavy lowering by the end of 2007. Safety In the underground areas the peak level of activity and parallel work has been reached and this will continue for the coming months. Utmost vigilance is required of everybody working underground and this must be maintained. However, it is encouraging to note that the compliance with safety rules is, in general, good. More and more work will be carried out from scaffolding and mobile access platforms. (cherry-picke...

  8. Scheduling mammograms for asymptomatic women

    International Nuclear Information System (INIS)

    Gohagan, J.K.; Darby, W.P.; Spitznagel, E.L.; Tome, A.E.

    1988-01-01

    A decision theoretic model was used to investigate the relative importance of risk level, radiation hazard, mammographic accuracy, and cost in mammographic screening decision. The model uses woman-specific medical and family history facts and clinic-specific information regarding mammographic accuracy and practice to profile both woman and clinic, and to formulate periodic screening recommendations. Model parameters were varied extensively to investigate the sensitivity of screening schedules to input values. Multivariate risk was estimated within the program using published data from the Breast Cancer Detection Demonstration Project 5-year follow-up study. Radiation hazard estimates were developed from published radiation physics and radioepidemiologic risk data. Benchmark values for mammographic sensitivity and specificity under screening conditions were calculated from Breast Cancer Detection Demonstration Project data. Procedural costs used in the analysis were varied around values reflecting conditions at the Washington University Medical Center. Mortality advantages of early versus late breast cancer detection were accounted for using Health Insurance Plan of New York case survival rates. Results are compared with published screening policies to provide insight into implicit assumptions behind those policies. This analysis emphasizes the importance of accounting for variations in clinical accuracy under screening circumstances, in costs, in radiation exposure, and in woman-specific risk when recommending mammographic screening

  9. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Since the lowering of YB0 in February, less spectacular but nonetheless crucial progress has been made along the critical path to CMS completion. The YB0 has been aligned with the beamline to a fraction of a mm, and the HCAL has been fully installed. Cabling scaffolding for YB0 services has been built and one half (-z end) of the ECAL barrel has been installed. The YB0 services installation has begun, with two of the major technical challenges delaying bulk installation, namely PP1 detailed design, manufacture and installation plus Tracker cooling pipe insulation, now apparently solved. Significant difficulties in detailed design, integration and procurement of cable ducts remain. Despite this, the design of the +end is close to complete, and Tracker power cable installation on two sectors of the +end is well advanced. A new master schedule, v36.0, is being prepared to account for the updated actual situation at point 5 and for the revised LHC machine planning. Safety The enormous amount of...

  10. Thermoluminescence dating of pleistocene sediments

    International Nuclear Information System (INIS)

    Poupeau, G.; Souza, J.H.; Rivera, A.

    1984-01-01

    After a short introduction on recent trends in quaternary geochronology, this article focuses on the thermoluminescence dating of sediments, whose principles and present limits and prospects are discussed. Results are presented for the TL behaviour of sands from various geological contexts in Brazil. They show that the coarse (approx. 100-200μm) quartz fraction of coastal and intra continental, eolian and fluvial-type deposits, might be datable by TL from the upper Holocene to at least the basis of the upper Pleistocene, with a precision of + - 10-15%. (Author) [pt

  11. Thermoluminescence dating of pleistocene sediments

    International Nuclear Information System (INIS)

    Poupeau, G.; Souza, J.H.

    1984-01-01

    After a short introduction on recent trends in quaternary geochronology, this article focuses on the thermoluminescence (TL) dating of sediments, whose principles, present limits and prospects are discussed. Results are presented for TL behavior of sands from various geological contexts in Brazil. They show that the coarse (approx. 100-200 μm) quartz fraction of coastal and intracontinental, eolian and fluvial - type deposits, might be datable by TL from the upper Holocene to at least the base of the upper Pleistocene, with a precision of +- 10-15%. (Author) [pt

  12. Scheduling nursing personnel on a microcomputer.

    Science.gov (United States)

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  13. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  14. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  15. Start-up date announced

    CERN Multimedia

    7th August 2008. CERN has announced that the first attempt to circulate the beam in the LHC will be made on the 10th September. This news comes as the cool down phase of commissioning the accelerator reaches a successful conclusion.The next phase is the synchronization of the LHC with the SPS accelerator, the last link in the LHC’s injector chain. A first synchronization test is scheduled for the 9th August, for the clockwise circulating beam, with the second to follow over the coming weeks.Once stable circulating beams have been established in September they will be brought to collision, and the final step will be to commission the LHC’s acceleration system to boost the energy to 5 TeV, the target energy for 2008.“We’re finishing a marathon with a sprint”, said LHC project leader Lyn Evans. “It’s been a long haul, and we’re all eager to get the LHC research programme underway.”For more information, please see the recent press release at: http://press.web.cern.ch/press/PressReleases/Rele...

  16. About One Memorable Date in the History of Spain

    Directory of Open Access Journals (Sweden)

    Galina I. Volkova

    2014-01-01

    Full Text Available In 1714 the Catalans, being in the camp of the losers in the War of the Spanish Succession, finally lost any hope to gain independence. 300 years later, nationalists, who are in power now in Catalonia, want to take advantage of that memorable date by organizing a regional referendum in order to choose their own path of development. In the aggravating conflict of interests between Madrid and Barcelona both parties use not only political and propaganda measures, but also financial leverages of influence. The ethnonational issue in the multiethnic Spain is far from being solved, because for centuries the process of forming a unified Spanish state was characterized by political union of several genetically related (except Basque ethnic communities, although with significant socio-cultural and linguistic differences among them. It is not coincidental that regional identity in Spain is still extremely strong, while the interethnic consolidation of the Spanish nation can be characterized as incomplete, which can be seen, particularly, in the intensification in recent decades of radical nationalist and separatist sentiments in Catalonia, the Basque Country and some other autonomies. Among reasons which escalated confrontation between supporters and opponents of Catalonian independence, we should mention the global financial crisis that hit the regions of Spain as well as the overall national economy. The separatists have many barriers on their way, starting from the constitutional provisions proclaiming Spain a united and indivisible state which impede to carry out regional plebiscites, and ending by an ambiguous attitude towards the hypothetical independence of Catalonia by both the residents of the region and in other parts of the country. It is important to keep in mind that in today's world the possibility of breaking large multiethnic state into ethnically constituting elements is more possible than 40-50 years ago. Disintegration of Yugoslavia and

  17. Department of Energy Delivery Commitment Schedules for spent nuclear fuel

    International Nuclear Information System (INIS)

    Klose, M.C.; Cole, B.M.

    1993-01-01

    The Delivery Commitment Schedule (DCS) provides Purchasers with the opportunity to inform the DOE of their plans for utilizing their allocations of projected spent nuclear fuel (SNF) acceptance capacity. This information will assist DOE in meeting its contractual waste acceptance responsibilities and in developing the Civilian Radioactive Waste Management System (CRWMS). 63 months prior to the delivery date, Purchasers submit a DCS(s) to designate: the range of discharge dates to the SNF the Purchaser desires to deliver, the fuel type, the type of transport cask required, the preferred shipping mode, and the particular site from which the Purchaser desires to deliver in the particular delivery year. The actual number of DCSs submitted by a Purchaser may vary according to the number of allocations they have and the number of DCSs they choose to submit for each allocation. Once a Purchaser submits a DCS, DOE will approve or disapprove the DCS within three months of receipt. The approved DCSs are used by DOE to assist in determining the baseline mix of truck and rail transportation casks. This paper delineates the DCS submittal process as well as the DCSs received to date along with their status and associated DOE commitments

  18. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  19. Substitution of Sugar with Dates Powder and Dates Syrup in Cookies Making

    OpenAIRE

    W.A. Alsenaien; R.A. Alamer; Zhen-Xing Tang; S.A. Albahrani; M.A. Al-Ghannam; S.M. Aleid

    2015-01-01

    In this study, the effects of dates powder and dates syrup as a sugar substitution, on the physical properties and sensory attributes of cookies were studied. An increase in firmness and moisture content of cookies supplemented with dates was obtained. The diameter and spread ratio of cookies showed a decrease with increasing levels of date powder or date syrup. Partial replacement of sugar with date powder or date syrup produced cookies with more dark and red color. Sensory evaluation result...

  20. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  1. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  2. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  3. Scheduling multimedia services in cloud computing environment

    Science.gov (United States)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  4. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  5. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  6. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  7. 85Kr dating of groundwater

    International Nuclear Information System (INIS)

    Rozanski, K.; Florkowski, T.

    1978-01-01

    The possibility of 85 Kr dating of groundwater is being investigated. The method of gas extraction from 200 to 300 litres of water sample has been developed. The Argon and Krypton mixture, separated from the gas extracted from water, was counted in a 1.5 ml volume proportional counter. The amount of krypton gas in the counter was determined by mass spectrometry. A number of surface and groundwater samples were analyzed indicating an 85 Kr concentration ranging from present atmospheric content (river water) to zero values. 85 Kr 'blank value' was determined to be about 5 per cent of present 85 Kr atmospheric content. For groundwater samples, the mean residence time in the system was calculated assuming the exponential model and known 85 Kr input function. Further improvement of the method should bring higher yield of krypton separation and lower volume of water necessary for analysis. (orig.) [de

  8. Blind-date Conversation Joining

    Directory of Open Access Journals (Sweden)

    Luca Cesari

    2013-07-01

    Full Text Available We focus on a form of joining conversations among multiple parties in service-oriented applications where a client may asynchronously join an existing conversation without need to know in advance any information about it. More specifically, we show how the correlation mechanism provided by orchestration languages enables a form of conversation joining that is completely transparent to clients and that we call 'blind-date joining'. We provide an implementation of this strategy by using the standard orchestration language WS-BPEL. We then present its formal semantics by resorting to COWS, a process calculus specifically designed for modelling service-oriented applications. We illustrate our approach by means of a simple, but realistic, case study from the online games domain.

  9. Making a date with radiocarbon

    International Nuclear Information System (INIS)

    Gribbin, J.

    1979-01-01

    The use of 14 C dating techniques for samples of organic materials up to 50,000 years old is discussed with especial reference to adjustment necessary to take account of both the most recent figure for the 14 C half-life and also the natural fluctuations in the production of 14 C over 50,000 years. Methods of detection and the accuracy of the measurements are considered. It is hoped that future developments including both the possibility of counting 14 C ions directly using an accelerator as a mass spectrometer, and also the use of laser enrichment techniques will not only push back the radiocarbon calendar to 100,000 years but will also allow the use of much smaller samples than before. (U.K.)

  10. Cost and schedule reduction for next-generation Candu

    International Nuclear Information System (INIS)

    Hopwood, J.M.; Yu, S.; Pakan, M.; Soulard, M.

    2002-01-01

    AECL has developed a suite of technologies for Candu R reactors that enable the next step in the evolution of the Candu family of heavy-water-moderated fuel-channel reactors. These technologies have been combined in the design for the Advanced Candu Reactor TM1 (ACRTM), AECL's next generation Candu power plant. The ACR design builds extensively on the existing Candu experience base, but includes innovations, in design and in delivery technology, that provide very substantial reductions in capital cost and in project schedules. In this paper, main features of next generation design and delivery are summarized, to provide the background basis for the cost and schedule reductions that have been achieved. In particular the paper outlines the impact of the innovative design steps for ACR: - Selection of slightly enriched fuel bundle design; - Use of light water coolant in place of traditional Candu heavy water coolant; - Compact core design with unique reactor physics benefits; - Optimized coolant and turbine system conditions. In addition to the direct cost benefits arising from efficiency improvement, and from the reduction in heavy water, the next generation Candu configuration results in numerous additional indirect cost benefits, including: - Reduction in number and complexity of reactivity mechanisms; - Reduction in number of heavy water auxiliary systems; - Simplification in heat transport and its support systems; - Simplified human-machine interface. The paper also describes the ACR approach to design for constructability. The application of module assembly and open-top construction techniques, based on Candu and other worldwide experience, has been proven to generate savings in both schedule durations and overall project cost, by reducing premium on-site activities, and by improving efficiency of system and subsystem assembly. AECL's up-to-date experience in the use of 3-D CADDS and related engineering tools has also been proven to reduce both engineering and

  11. Bridging the Gap Between Planning and Scheduling

    Science.gov (United States)

    Smith, David E.; Frank, Jeremy; Jonsson, Ari K.; Norvig, Peter (Technical Monitor)

    2000-01-01

    Planning research in Artificial Intelligence (AI) has often focused on problems where there are cascading levels of action choice and complex interactions between actions. In contrast. Scheduling research has focused on much larger problems where there is little action choice, but the resulting ordering problem is hard. In this paper, we give an overview of M planning and scheduling techniques, focusing on their similarities, differences, and limitations. We also argue that many difficult practical problems lie somewhere between planning and scheduling, and that neither area has the right set of tools for solving these vexing problems.

  12. Make a date with a tree

    International Nuclear Information System (INIS)

    Baillie, M.; Pilcher, J.

    1988-01-01

    The paper concerns the use of dendrochronology to check the accuracy of radiocarbon dating. The Belfast chronology is described - this involves wood samples precisely dated by tree ring analysis and analysed by high-precision radiocarbon analysis. The analysis resulted in the first continuous high-precision calibration of the radiocarbon time-scale, and confirmed the relationship between radiocarbon dates and tree-ring dates. The use of radiocarbon dating to reveal the age of wood samples that have too few rings to produce an accurate date, is also outlined. (U.K.)

  13. The scientific dating of standing buildings.

    Science.gov (United States)

    Alcock, Nathaniel W

    2017-11-17

    The techniques of dendrochronology (tree-ring dating) and radiocarbon (14C) dating are described, as they are applied to historic buildings. Both rely on determining the felling dates of the trees used in their construction. For dendrochronology, the construction of master chronologies and the matching of individual ring-width sequences to them is described and, for radiocarbon dating, the use of tree-ring results in calibration. Results of dating are discussed, ranging from the cathedrals of Peterborough and Beauvais and the development of crown-post roof structures, to the dating and identification of standing medieval peasant houses, particularly those built using cruck construction.

  14. 17 CFR 248.128 - Effective date, compliance date, and prospective application.

    Science.gov (United States)

    2010-04-01

    ... Affiliate Marketing § 248.128 Effective date, compliance date, and prospective application. (a) Effective date. This subpart is effective September 10, 2009. (b) Mandatory compliance date. Compliance with this... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Effective date, compliance...

  15. Radiocarbon dates for Rangitoto and Motutapu, a consideration of dating accuracy

    International Nuclear Information System (INIS)

    Law, R.G.

    1975-01-01

    The carbon dates for the eruptions of Rangitoto and the occupation of Maori sites on Motutapu contain inconsistencies which are explicable only after the dates have been corrected to allow for the nature of the dating method. The only date which is reasonably established is a 14th or 15th century dating for the ash shower covering Motutapu. (auth.)

  16. Efficient Academic Scheduling at the U.S. Naval Academy

    National Research Council Canada - National Science Library

    Zane, David

    2003-01-01

    This research project examined academic scheduling problems at the U.S. Naval Academy. The focus was on devising methods to construct good final exam schedules and improve existing course schedules by facilitation course changes...

  17. Athabasca--special report No. 1, we are progressing on schedule

    Energy Technology Data Exchange (ETDEWEB)

    Moss, A E

    1966-09-01

    Since April of 1964 when the government of Alberta gave permission for the production of crude oil from the Athabasca Tar Sands, construction of a $240 million oil sands venture has been progressing according to schedule. This plant will be capable of processing 45,000 bbl of crude oil per day and will require the mining of approximately 135,000 tons of material per day. The scheduled completion date for this project is Sept. 1967. This huge project consists of the construction of various plant units and service facilities, preparation of the mine for production, construction of a highway and a multi- million dollar bridge, and the design and construction of a 16-in. pipeline 266 miles in length. A shortage of experienced engineers, supervisors, and skilled tradesmen has been the largest problem. In spite of the many problems encountered, approximately 50% of the construction has now been completed and the plant will be completed on schedule.

  18. Scheduling a maintenance activity under skills constraints to minimize total weighted tardiness and late tasks

    Directory of Open Access Journals (Sweden)

    Djalal Hedjazi

    2015-04-01

    Full Text Available Skill management is a key factor in improving effectiveness of industrial companies, notably their maintenance services. The problem considered in this paper concerns scheduling of maintenance tasks under resource (maintenance teams constraints. This problem is generally known as unrelated parallel machine scheduling. We consider the problem with a both objectives of minimizing total weighted tardiness (TWT and number of tardiness tasks. Our interest is focused particularly on solving this problem under skill constraints, which each resource has a skill level. So, we propose a new efficient heuristic to obtain an approximate solution for this NP-hard problem and demonstrate his effectiveness through computational experiments. This heuristic is designed for implementation in a static maintenance scheduling problem (with unequal release dates, processing times and resource skills, while minimizing objective functions aforementioned.

  19. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  20. Quantify Risk to Manage Cost and Schedule

    National Research Council Canada - National Science Library

    Raymond, Fred

    1999-01-01

    Too many projects suffer from unachievable budget and schedule goals, caused by unrealistic estimates and the failure to quantify and communicate the uncertainty of these estimates to managers and sponsoring executives...

  1. Alternative Work Schedules Increase Employee Satisfaction.

    Science.gov (United States)

    Turney, John R.; Cohen, Stanley L.

    1983-01-01

    Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)

  2. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  3. Nonblocking Scheduling for Web Service Transactions

    DEFF Research Database (Denmark)

    Alrifai, Mohammad; Balke, Wolf-Tilo; Dolog, Peter

    2007-01-01

    . In this paper, we propose a novel nonblocking scheduling mechanism that is used prior to the actual service invocations. Its aim is to reach an agreement between the client and all participating providers on what transaction processing times have to be expected, accepted, and guaranteed. This enables service......For improved flexibility and concurrent usage existing transaction management models for Web services relax the isolation property of Web service-based transactions. Correctness of the concurrent execution then has to be ensured by commit order-preserving transaction schedulers. However, local...... schedulers of service providers typically do take into account neither time constraints for committing the whole transaction, nor the individual services' constraints when scheduling decisions are made. This often leads to an unnecessary blocking of transactions by (possibly long-running) others...

  4. Schedule Sales Query Report Generation System

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  5. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  6. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  7. Congruent Validity of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Harris, Thomas L.; Brown, Nina W.

    1979-01-01

    The validity of the Rathus Assertiveness Schedule (RAS) was investigated by correlating it with the six Class I scales of the California Psychological Inventory on a sample of undergraduate students. Results supported the validity of the RAS. (JKS)

  8. Cure Schedule for Stycast 2651/Catalyst 11.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, Tg, exceeding cure temperature).

  9. Job shop scheduling by local search

    NARCIS (Netherlands)

    Aarts, E.H.L.; Lenstra, J.K.; Laarhoven, van P.J.M.; Ulder, N.L.J.

    1992-01-01

    We present a computational performance analysis of local search algorithms for job shop scheduling. The algorithms under investigation are iterative improvement, simulated annealing, threshold accepting and genetic local search. Our study shows that simulated annealing performs best in the sense

  10. Job scheduling in a heterogenous grid environment

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-02-11

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  11. The School Schedule--Servant or Mistress?

    Science.gov (United States)

    Holmes, Mark

    1984-01-01

    Pointing out that time is a dimension of school wealth, the author explores its use in school schedules. Administrators need to be aware of the relationship between time allocation and learning consequences. (MD)

  12. Economic and psychological burden of scheduled surgery ...

    African Journals Online (AJOL)

    Background: Cancellation of scheduled surgery creates a financial burden for hospitals, caregivers and ..... costs and disregard some of the aspects mentioned in the ..... cancellation of elective surgical procedures in a Spanish general.

  13. Onboard Autonomous Scheduling Intelligence System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Scheduling the daily activities of the crew on a human space mission is currently a cumbersome job performed by a large team of operations experts on the ground....

  14. Home Appliance Load Scheduling with SEMIAH

    DEFF Research Database (Denmark)

    Jacobsen, Rune Hylsberg; Ghasem Azar, Armin; Zhang, Qi

    2015-01-01

    The European research project SEMIAH aims at designing a scalable infrastructure for residential demand response. This paper presents the progress towards a centralized load scheduling algorithm for controlling home appliances taking power grid constraints and satisfaction of consumers into account....

  15. Courts, Scheduled Damages, and Medical Malpractice Insurance

    DEFF Research Database (Denmark)

    Bertoli, Paola; Grembi, Veronica

    We assess the impact of the introduction of schedules of non-economic damages (i.e. tiered caps systems) on the behavior of insurers operating in the medical liability market for hospitals while controlling the performance of the judicial system, measured as court backlog. Using a difference......-in-differences strategy on Italian data, we find that the introduction of schedules increases the presence of insurers (i.e. medical liability market attractiveness) only in inefficient judicial districts. In the same way, court inefficiency is attractive to insurers for average values of schedules penetration...... of the market, with an increasing positive impact of inefficiency as the territorial coverage of schedules increases. Finally, no significant impact is registered on paid premiums. Our analysis sheds light on a complex set of elements affecting the decisions of insurers in malpractice markets. The analysis...

  16. 76 FR 18262 - January 2011 Pay Schedules

    Science.gov (United States)

    2011-04-01

    ... an OPM memorandum, CPM 2009-27. (See http://www.opm.gov/oca/compmemo/index.asp .) Executive Order... Schedule ($165,300 in 2011, the same level as in 2010). On December 27, 2010, OPM issued a memorandum (CPM...

  17. Optimal Due Date Assignment and Resource Allocation to Minimize the Weighted Number of Tardy Jobs on a Single Machine

    OpenAIRE

    Dvir Shabtay; George Steiner

    2007-01-01

    With the increased emphasis on the effective management of operational issues in supply chains, the timely delivery of products has become even more important. Companies have to quote attainable delivery dates and then meet these, or face large tardiness penalties. We study systems that can be modeled by single-machine scheduling problems with due date assignment and controllable job-processing times, which are either linear or convex functions of the amount of a continuously divisible and no...

  18. California LLW disposal site development update: Ahead of milestone schedule

    International Nuclear Information System (INIS)

    Romano, S.A.; Gaynor, R.K.

    1987-01-01

    US Ecology has been designated by the State of California to locate, develop and operate a low-level radioactive waste disposal facility. In early 1986, the firm identified eighteen desert basins in southeastern California for siting consideration. Three candidate sites were selected for detailed field characterization work in February, 1987. A preferred site for licensing purposes will be identified in early 1988. California is currently ahead of the siting milestone schedule mandated by the Low-Level Radioactive Waste Policy Amendments Act. It is likely that a license application will be filed before the 1990 milestone date. This paper describes the process undertaken by US Ecology to identify three candidates sites for characterization, and the public involvement program supporting this decision. Future activities leading to final site development are also described

  19. Geophysical Insights from Archaeomagnetic Dating

    Science.gov (United States)

    Holme, R.; Lodge, A.; Suttie, N.; Shaw, J.; Hill, M. J.; Linford, P.

    2009-12-01

    We report on work which has been undertaken towards developing an improved methodology for archaeomagnetic dating of archaeological samples through the use of a dedicated field model. In this talk, we focus on the more general (non-archaeological) implications of our results. Our work has focused on Europe, taking advantage of the better spatial and temporal coverage of available samples. Nevertheless, we model the field globally, using an a priori model (such as, for example, CALS7K) to constrain the field away from the regions of available data. This is advantageous over the use of a local field modelling methodology, as it allows us to examine the physical consequences of structure in our model (for example, in terms of the spectra of the field and secular variation at the core-mantle boundary), and to control possible edge effects in the model, which in a local model might produce an unphysical solution. By focusing on one particular region, we produce models that may not be optimal in terms of global structure, but allow us to investigate the data content in the region where it may provide the most information on core-field evolution. In parallel, we have been expanding the archaeointensity record for Great Britain, towards producing an archaeointensity curve for the UK which could ultimately be used for dating of unoriented samples (such as pot sherds). This new record, combined with other recently acquired high-quality intensity data, allows us to consider the evolution of global geomagnetic field strength in parallel with a good model of directional measurements; from 1590, the GUFM model is appropriate. Recent attempts to determine global intensity variation have used all available data (some of uncertain quality) to quantify variations in field strength. By instead focusing on a more limited dataset of known quality, we are able to examine intensity trends in greater detail. We present evidence that the intensity of the field was higher prior to 1840 than

  20. Heuristic Approach for Balancing Shift Schedules

    International Nuclear Information System (INIS)

    Kim, Dae Ho; Yun, Young Su; Lee, Yong Hee

    2005-01-01

    In this paper, a heuristic approach for balancing shift schedules is proposed. For the shift schedules, various constraints which have usually been considered in realworld industry are used, and the objective is to minimize the differences of the workloads in each workgroup. The constraints and objective function are implemented in the proposed heuristic approach. Using a simple instance, the efficiency of the proposed heuristic approach is proved

  1. Algorithms for classical and modern scheduling problems

    OpenAIRE

    Ott, Sebastian

    2016-01-01

    Subject of this thesis is the design and the analysis of algorithms for scheduling problems. In the first part, we focus on energy-efficient scheduling, where one seeks to minimize the energy needed for processing certain jobs via dynamic adjustments of the processing speed (speed scaling). We consider variations and extensions of the standard model introduced by Yao, Demers, and Shenker in 1995 [79], including the addition of a sleep state, the avoidance of preemption, and variable speed lim...

  2. Maritime wideband communication networks video transmission scheduling

    CERN Document Server

    Yang, Tingting

    2014-01-01

    This Springer Brief covers emerging maritime wideband communication networks and how they facilitate applications such as maritime distress, urgency, safety and general communications. It provides valuable insight on the data transmission scheduling and protocol design for the maritime wideband network. This brief begins with an introduction to maritime wideband communication networks including the architecture, framework, operations and a comprehensive survey on current developments. The second part of the brief presents the resource allocation and scheduling for video packet transmission wit

  3. Lift scheduling organization : Lift Concept for Lemminkainen

    OpenAIRE

    Mingalimov, Iurii

    2015-01-01

    The purpose of the work was to make a simple schedule for the main contractors and clients to check and control workflow connected with lifts. It gathers works with electricity, construction, engineering networks, installing equipment and commissioning works. The schedule was carried out during working on the building site Aino in Saint Petersburg in Lemminkӓinen. The duration of work was 5 months. The lift concept in Lemminkӓinen is very well controlled in comparison with other buil...

  4. Revised data taking schedule with ion beams

    CERN Document Server

    Gazdzicki, Marek; Aduszkiewicz, A; Andrieu, B; Anticic, T; Antoniou, N; Argyriades, J; Asryan, A G; Baatar, B; Blondel, A; Blumer, J; Boldizsar, L; Bravar, A; Brzychczyk, J; Bubak, A; Bunyatov, S A; Choi, K U; Christakoglou, P; Chung, P; Cleymans, J; Derkach, D A; Diakonos, F; Dominik, W; Dumarchez, J; Engel, R; Ereditato, A; Feofilov, G A; Fodor, Z; Ferrero, A; Gazdzicki, M; Golubeva, M; Grebieszkow, K; Grzeszczuk, A; Guber, F; Hasegawa, T; Haungs, A; Igolkin, S; Ivanov, A S; Ivashkin, A; Kadija, K; Katrynska, N; Kielczewska, D; Kikola, D; Kisiel, J; Kobayashi, T; Kolesnikov, V I; Kolev, D; Kolevatov, R S; Kondratiev, V P; Kowalski, S; Kurepin, A; Lacey, R; Laszlo, A; Lyubushkin, V V; Majka, Z; I Malakhov, A; Marchionni, A; Marcinek, A; Maris, I; Matveev, V; Melkumov, G L; Meregaglia, A; Messina, M; Mijakowski, P; Mitrovski, M; Montaruli, T; Mrówczynski, St; Murphy, S; Nakadaira, T; Naumenko, P A; Nikolic, V; Nishikawa, K; Palczewski, T; Pálla, G; Panagiotou, A D; Peryt, W; Planeta, R; Pluta, J; Popov, B A; Posiadala, M; Przewlocki, P; Rauch, W; Ravonel, M; Renfordt, R; Röhrich, D; Rondio, E; Rossi, B; Roth, M; Rubbia, A; Rybczynski, M; Sadovskii, A; Sakashita, K; Schuster, T; Sekiguchi, T; Seyboth, P; Shibata, M; Sissakian, A N; Skrzypczak, E; Slodkowski, M; Sorin, A S; Staszel, P; Stefanek, G; Stepaniak, J; Strabel, C; Ströbele, H; Susa, T; Szentpétery, I; Szuba, M; Tada, M; Taranenko, A; Tsenov, R; Ulrich, R; Unger, M; Vassiliou, M; Vechernin, V V; Vesztergombi, G; Wlodarczyk, Z; Wojtaszek, A; Zipper, W; CERN. Geneva. SPS and PS Experiments Committee; SPSC

    2009-01-01

    This document presents the revised data taking schedule of NA61 with ion beams. The revision takes into account limitations due to the new LHC schedule as well as final results concerning the physics performance with secondary ion beams. It is proposed to take data with primary Ar and Xe beams in 2012 and 2014, respectively, and to test and use for physics a secondary B beam from primary Pb beam fragmentation in 2010, 2011 and 2013.

  5. Job schedul in Grid batch farms

    International Nuclear Information System (INIS)

    Gellrich, Andreas

    2014-01-01

    We present here a study for a scheduler which cooperates with the queueing system TORQUE and is tailored to the needs of a HEP-dominated large Grid site with around 10000 jobs slots. Triggered by severe scaling problems of MAUI, a scheduler, referred to as MYSCHED, was developed and put into operation. We discuss conceptional aspects as well as experiences after almost two years of running.

  6. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  7. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  8. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  9. Interactive Dynamic Mission Scheduling for ASCA

    Science.gov (United States)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  10. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  11. Dates and Times Made Easy with lubridate

    Directory of Open Access Journals (Sweden)

    Garrett Grolemund

    2011-04-01

    Full Text Available This paper presents the lubridate package for R, which facilitates working with dates and times. Date-times create various technical problems for the data analyst. The paper highlights these problems and oers practical advice on how to solve them using lubridate. The paper also introduces a conceptual framework for arithmetic with date-times in R.

  12. Genetic programming for evolving due-date assignment models in job shop environments.

    Science.gov (United States)

    Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen

    2014-01-01

    Due-date assignment plays an important role in scheduling systems and strongly influences the delivery performance of job shops. Because of the stochastic and dynamic nature of job shops, the development of general due-date assignment models (DDAMs) is complicated. In this study, two genetic programming (GP) methods are proposed to evolve DDAMs for job shop environments. The experimental results show that the evolved DDAMs can make more accurate estimates than other existing dynamic DDAMs with promising reusability. In addition, the evolved operation-based DDAMs show better performance than the evolved DDAMs employing aggregate information of jobs and machines.

  13. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  14. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  15. Reservoir effects in radiocarbon dating

    International Nuclear Information System (INIS)

    Head, M.J.

    1997-01-01

    Full text: The radiocarbon dating technique depends essentially on the assumption that atmospheric carbon dioxide containing the cosmogenic radioisotope 14 C enters into a state of equilibrium with all living material (plants and animals) as part of the terrestrial carbon cycle. Terrestrial reservoir effects occur when the atmospheric 14 C signal is diluted by local effects where systems depleted in 14 C mix with systems that are in equilibrium with the atmosphere. Naturally, this can occur with plant material growing close to an active volcano adding very old CO 2 to the atmosphere (the original 14 C has completely decayed). It can also occur in highly industrialised areas where fossil fuel derived CO 2 dilutes the atmospheric signal. A terrestrial reservoir effect can occur in the case of fresh water shells living in rivers or lakes where there is an input of ground water from springs or a raising of the water table. Soluble bicarbonate derived from the dissolution of very old limestone produces a 14 C dilution effect. Land snail shells and stream carbonate depositions (tufas and travertines) can be affected by a similar mechanism. Alternatively, in specific cases, these reservoir effects may not occur. This means that general interpretations assuming quantitative values for these terrestrial effects are not possible. Each microenvironment associated with samples being analysed needs to be evaluated independently. Similarly, the marine environment produces reservoir effects. With respect to marine shells and corals, the water depth at which carbonate growth occurs can significantly affect quantitative 14 C dilution, especially in areas where very old water is uplifted, mixing with top layers of water that undergo significant exchange with atmospheric CO 2 . Hence, generalisations with respect to the marine reservoir effect also pose problems. These can be exacerbated by the mixing of sea water with either terrestrial water in estuaries, or ground water where

  16. 76 FR 16419 - Filing Dates for the New York Special Election in the 26th Congressional District

    Science.gov (United States)

    2011-03-23

    ... 26th Congressional District AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY: New York has scheduled a Special General Election on May 24, 2011, to fill the.... Committees required to file reports in connection with the Special General Election on May 24, 2011, shall...

  17. 75 FR 62131 - Filing Dates for the New York Special Election in the 29th Congressional District

    Science.gov (United States)

    2010-10-07

    ... 29th Congressional District AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY: New York has scheduled a Special General Election on November 2, 2010, to fill.... Committees required to file reports in connection with the Special General Election on November 2, 2010...

  18. 76 FR 45797 - Filing Dates for the New York Special Election in the 9th Congressional District

    Science.gov (United States)

    2011-08-01

    ... 9th Congressional District AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY: New York has scheduled a Special General Election on September 13, 2011, to.... Committees required to file reports in connection with the Special General Election on September 13, 2011...

  19. A Study on the Enhanced Best Performance Algorithm for the Just-in-Time Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Sivashan Chetty

    2015-01-01

    Full Text Available The Just-In-Time (JIT scheduling problem is an important subject of study. It essentially constitutes the problem of scheduling critical business resources in an attempt to optimize given business objectives. This problem is NP-Hard in nature, hence requiring efficient solution techniques. To solve the JIT scheduling problem presented in this study, a new local search metaheuristic algorithm, namely, the enhanced Best Performance Algorithm (eBPA, is introduced. This is part of the initial study of the algorithm for scheduling problems. The current problem setting is the allocation of a large number of jobs required to be scheduled on multiple and identical machines which run in parallel. The due date of a job is characterized by a window frame of time, rather than a specific point in time. The performance of the eBPA is compared against Tabu Search (TS and Simulated Annealing (SA. SA and TS are well-known local search metaheuristic algorithms. The results show the potential of the eBPA as a metaheuristic algorithm.

  20. Generation of Look-Up Tables for Dynamic Job Shop Scheduling Decision Support Tool

    Science.gov (United States)

    Oktaviandri, Muchamad; Hassan, Adnan; Mohd Shaharoun, Awaluddin

    2016-02-01

    Majority of existing scheduling techniques are based on static demand and deterministic processing time, while most job shop scheduling problem are concerned with dynamic demand and stochastic processing time. As a consequence, the solutions obtained from the traditional scheduling technique are ineffective wherever changes occur to the system. Therefore, this research intends to develop a decision support tool (DST) based on promising artificial intelligent that is able to accommodate the dynamics that regularly occur in job shop scheduling problem. The DST was designed through three phases, i.e. (i) the look-up table generation, (ii) inverse model development and (iii) integration of DST components. This paper reports the generation of look-up tables for various scenarios as a part in development of the DST. A discrete event simulation model was used to compare the performance among SPT, EDD, FCFS, S/OPN and Slack rules; the best performances measures (mean flow time, mean tardiness and mean lateness) and the job order requirement (inter-arrival time, due dates tightness and setup time ratio) which were compiled into look-up tables. The well-known 6/6/J/Cmax Problem from Muth and Thompson (1963) was used as a case study. In the future, the performance measure of various scheduling scenarios and the job order requirement will be mapped using ANN inverse model.

  1. SPORT: An Algorithm for Divisible Load Scheduling with Result Collection on Heterogeneous Systems

    Science.gov (United States)

    Ghatpande, Abhay; Nakazato, Hidenori; Beaumont, Olivier; Watanabe, Hiroshi

    Divisible Load Theory (DLT) is an established mathematical framework to study Divisible Load Scheduling (DLS). However, traditional DLT does not address the scheduling of results back to source (i. e., result collection), nor does it comprehensively deal with system heterogeneity. In this paper, the DLSRCHETS (DLS with Result Collection on HET-erogeneous Systems) problem is addressed. The few papers to date that have dealt with DLSRCHETS, proposed simplistic LIFO (Last In, First Out) and FIFO (First In, First Out) type of schedules as solutions to DLSRCHETS. In this paper, a new polynomial time heuristic algorithm, SPORT (System Parameters based Optimized Result Transfer), is proposed as a solution to the DLSRCHETS problem. With the help of simulations, it is proved that the performance of SPORT is significantly better than existing algorithms. The other major contributions of this paper include, for the first time ever, (a) the derivation of the condition to identify the presence of idle time in a FIFO schedule for two processors, (b) the identification of the limiting condition for the optimality of FIFO and LIFO schedules for two processors, and (c) the introduction of the concept of equivalent processor in DLS for heterogeneous systems with result collection.

  2. Evidence for Non-Opponent Coding of Colour Information in Human Visual Cortex: Selective Loss of “Green” Sensitivity in a Subject with Damaged Ventral Occipito-Temporal Cortex

    Science.gov (United States)

    Rauscher, Franziska G.; Plant, Gordon T.; James-Galton, Merle; Barbur, John L.

    2011-01-01

    Damage to ventral occipito-temporal extrastriate visual cortex leads to the syndrome of prosopagnosia often with coexisting cerebral achromatopsia. A patient with this syndrome resulting in a left upper homonymous quadrantanopia, prosopagnosia, and incomplete achromatopsia is described. Chromatic sensitivity was assessed at a number of locations in the intact visual field using a dynamic luminance contrast masking technique that isolates the use of colour signals. In normal subjects chromatic detection thresholds form an elliptical contour when plotted in the Commission Internationale d’Eclairage, (x-y), chromaticity diagram. Because the extraction of colour signals in early visual processing involves opponent mechanisms, subjects with Daltonism (congenital red/green loss of sensitivity) show symmetric increase in thresholds towards the long wavelength (“red”) and middle wavelength (“green”) regions of the spectrum locus. This is also the case with acquired loss of chromatic sensitivity as a result of retinal or optic nerve disease. Our patient’s results were an exception to this rule. Whilst his chromatic sensitivity in the central region of the visual field was reduced symmetrically for both “red/green” and “yellow/blue” directions in colour space, the subject’s lower left quadrant showed a marked asymmetry in “red/green” thresholds with the greatest loss of sensitivity towards the “green” region of the spectrum locus. This spatially localized asymmetric loss of “green” but not “red” sensitivity has not been reported previously in human vision. Such loss is consistent with selective damage of neural substrates in the visual cortex that process colour information, but are spectrally non-opponent. PMID:27956924

  3. Road sign detection based on opponent color and rotational symmetry%基于颜色对抗和旋转对称的路标检测算法

    Institute of Scientific and Technical Information of China (English)

    黄跃凯; 徐丹; 曾昊; 吴达德

    2014-01-01

    本文针对禁止和警告标志提出了一种基于颜色对抗和旋转中心投影的检测方法。颜色对抗来源于人眼视觉机制中存在的相互对立的红/绿、黄/蓝色素对,以此突出红色和黄色区域。投影阶段则利用交通标志规则多边形的特征将点对的梯度向量向其旋转中心投影,得到多边形的中心位置和尺度信息。另外,采用多边形的几何特征进一步区分交通标志的类别。实验证明该方法能够满足实时需求,并对光照、旋转、尺度变化具有一定的不变性。%We present a real time road sign detection framework for warning and prohibition signs based on opponent colors and rotational center voting. The opponent colors exist in human primary visual cortex, like red/green, yellow/blue, by which red and yellow regions can be enhanced. During voting stage, pairwise gradient vectors vote for their rotational symmetry centers then regular polygons’ position and scales will be detected. Furthermore, polygons’ geometric features are used to classify the shape of the road signs. The experiments show that the proposed method satisfies real time application and is partly invariant to changes of illumination, scale and rotation.

  4. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  5. Interoceanic canal excavation scheduling via computer simulation

    Energy Technology Data Exchange (ETDEWEB)

    Baldonado, Orlino C [Holmes and Narver, Inc., Los Angeles, CA (United States)

    1970-05-15

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  6. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors.

    Science.gov (United States)

    Zilanawala, Afshin

    2017-06-01

    Objectives Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9-5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Cohort Study (n = 17,397), to investigate the association between types of maternal nonstandard work (evening, night, away from home overnight, and weekends) and breastfeeding behaviors. Results In unadjusted models, exposure to evening shifts was associated with greater odds of breastfeeding initiation (OR 1.71, CI 1.50-1.94) and greater odds of short (OR 1.55, CI 1.32-1.81), intermediate (OR 2.01, CI 1.64-2.47), prolonged partial duration (OR 2.20, CI 1.78-2.72), and prolonged exclusive duration (OR 1.53, CI 1.29-1.82), compared with mothers who were unemployed and those who work other types of nonstandard shifts. Socioeconomic advantage of mothers working evening schedules largely explained the higher odds of breastfeeding initiation and duration. Conclusions Socioeconomic characteristics explain more breastfeeding behaviors among mothers working evening shifts. Policy interventions to increase breastfeeding initiation and duration should consider the timing of maternal work schedules.

  7. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  8. Step-by-step cyclic processes scheduling

    DEFF Research Database (Denmark)

    Bocewicz, G.; Nielsen, Izabela Ewa; Banaszak, Z.

    2013-01-01

    Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research is to pro......Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research...... is to provide a declarative model enabling to state a constraint satisfaction problem aimed at AGVs fleet scheduling subject to assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS’s material handling and production routes of simultaneously manufactured...... orders, the main objective is to provide the declarative framework aimed at conditions allowing one to calculate the AGVs fleet schedule in online mode. An illustrative example of the relevant algebra-like driven step-by-stem cyclic scheduling is provided....

  9. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  10. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  11. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  12. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  13. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  14. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) It is the policy of the Board to consider unrealistic scheduling of... to the advertising of scheduled performance, it is the policy of the Board to regard as an unfair or...

  15. An introduction to optimal satellite range scheduling

    CERN Document Server

    Vázquez Álvarez, Antonio José

    2015-01-01

    The satellite range scheduling (SRS) problem, an important operations research problem in the aerospace industry consisting of allocating tasks among satellites and Earth-bound objects, is examined in this book. SRS principles and solutions are applicable to many areas, including: Satellite communications, where tasks are communication intervals between sets of satellites and ground stations Earth observation, where tasks are observations of spots on the Earth by satellites Sensor scheduling, where tasks are observations of satellites by sensors on the Earth. This self-contained monograph begins with a structured compendium of the problem and moves on to explain the optimal approach to the solution, which includes aspects from graph theory, set theory, game theory and belief networks. This book is accessible to students, professionals and researchers in a variety of fields, including: operations research, optimization, scheduling theory, dynamic programming and game theory. Taking account of the distributed, ...

  16. Optimal Scheduling of Domestic Appliances via MILP

    Directory of Open Access Journals (Sweden)

    Zdenek Bradac

    2014-12-01

    Full Text Available This paper analyzes a consumption scheduling mechanism for domestic appliances within a home area network. The aim of the proposed scheduling is to minimize the total energy price paid by the consumer and to reduce power peaks in order to achieve a balanced daily load schedule. An exact and computationally efficient mixed-integer linear programming (MILP formulation of the problem is presented. This model is verified by several problem instances. Realistic scenarios based on the real price tariffs commercially available in the Czech Republic are calculated. The results obtained by solving the optimization problem are compared with a simulation of the ripple control service currently used by many domestic consumers in the Czech Republic.

  17. Radiocarbon dating of soils, a review

    International Nuclear Information System (INIS)

    Scharpenseel, H.W.; Schiffmann, H.

    1977-01-01

    The application of radiocarbon dating techniques for pedological purposes is reviewed in chronological sequence of its phases of introduction. Initially dating of charcoal and buried paleosols was dominating and accompanied by few soil dating attempts of recent soil formations on the basis of extracted humic acid-C. The following controversy regarding the potentialities and limitations of recent soil dating, still being involved in the intact turnover processes of modern biodynamics, led to intensive search for the relatively oldest, most favorable C-fraction, particularly a biologically inert C-fraction of the organic C-pool. Inclusion of C-14 dating in pedogenetic working concepts required soil profile date-scanning in order to reveal the age versus depth interdependence. (orig./HK) [de

  18. Crane Scheduling for a Plate Storage

    DEFF Research Database (Denmark)

    Hansen, Jesper; Clausen, Jens

    2002-01-01

    Odense Steel Shipyard produces the worlds largest container ships. The first process of producing the steel ships is handling arrival and storage of steel plates until they are needed in production. This paper considers the problem of scheduling two cranes that carry out the movements of plates...... into, around and out of the storage. The system is required to create a daily schedule for the cranes, but also handle possible disruptions during the execution of the plan. The problem is solved with a Simulated Annealing algorithm....

  19. Autonomous scheduling technology for Earth orbital missions

    Science.gov (United States)

    Srivastava, S.

    1982-01-01

    The development of a dynamic autonomous system (DYASS) of resources for the mission support of near-Earth NASA spacecraft is discussed and the current NASA space data system is described from a functional perspective. The future (late 80's and early 90's) NASA space data system is discussed. The DYASS concept, the autonomous process control, and the NASA space data system are introduced. Scheduling and related disciplines are surveyed. DYASS as a scheduling problem is also discussed. Artificial intelligence and knowledge representation is considered as well as the NUDGE system and the I-Space system.

  20. Scheduling projects with multiskill learning effect.

    Science.gov (United States)

    Zha, Hong; Zhang, Lianying

    2014-01-01

    We investigate the project scheduling problem with multiskill learning effect. A new model is proposed to deal with the problem, where both autonomous and induced learning are considered. In order to obtain the optimal solution, a genetic algorithm with specific encoding and decoding schemes is introduced. A numerical example is used to illustrate the proposed model. The computational results show that the learning effect cannot be neglected in project scheduling. By means of determining the level of induced learning, the project manager can balance the project makespan with total cost.

  1. Anesthesiology Nurse Scheduling using Particle Swarm Optimization

    Directory of Open Access Journals (Sweden)

    Leopoldo Altamirano

    2012-02-01

    Full Text Available In this article we present an approach designed to solve a real world problem: the Anesthesiology Nurse Scheduling Problem (ANSP at a public French hospital. The anesthesiology nurses are one of the most shared resources in the hospital and we attempt to find a fair/balanced schedule for them, taking into account a set of constraints and the nursesarsquo; stated preferences, concerning the different shifts. We propose a particle swarm optimization algorithm to solve the ANSP. Finally, we compare our technique with previous results obtained using integer programming.

  2. Real-time systems scheduling 2 focuses

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc. Scheduling is a central problem for these computing/communication systems since it is responsible for software execution in a timely manner. This book, the second of two volumes on the subject, brings together knowledge on specific topics and discusses the recent advances for some of them.  It addresses foundations as well as the latest advances and findings in real-time scheduling, giving comprehensive references to important papers, but the chapters are short and not overloaded with co

  3. Optimal scheduling of coproduction with a storage

    International Nuclear Information System (INIS)

    Ravn, H.F.; Rygard, J.M.

    1993-02-01

    We consider the problem of optimal scheduling of a system with combined heat and heat (CHP) units and a heat storege. The purpose of the heat storage is to permit a partial decoupling of the variations in the demand for heat and electrical power. We formulate the problem of optimal scheduling as that of minimizing the total costs over the planning period. The heat demand from the district heating system and the ''shadow prices'' for the electrical power system are taken as externally given parameters. The resulting model is solved by dynamic programming. We describe implementation details and we give examples of result of the optimization. (au) (12 refs.)

  4. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...

  5. Real-time systems scheduling fundamentals

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc.  Scheduling is a central problem for these computing/communication systems since responsible of software execution in a timely manner. This book provides state of knowledge in this domain with special emphasis on the key results obtained within the last decade. This book addresses foundations as well as the latest advances and findings in Real-Time Scheduling, giving all references to important papers. But nevertheless the chapters will be short and not overloaded with confusing details.

  6. Sample processing procedures and radiocarbon dating

    International Nuclear Information System (INIS)

    Svetlik, Ivo; Tomaskova, Lenka; Dreslerova, Dagmar

    2010-01-01

    The article outlines radiocarbon dating routines and highlights the potential and limitations of this method. The author's institutions have been jointly running a conventional radiocarbon dating laboratory using the international CRL code. A procedure based on the synthesis of benzene is used. Small samples are sent abroad for dating because no AMS instrumentation is available in the Czech Republic so far. Our laboratory plans to introduce routines for the processing of milligram samples and preparation of graphitized targets for AMS

  7. Thermoluminescence dating of Indian archaeological sites

    International Nuclear Information System (INIS)

    Singhvi, A.K.; Sharma, Y.P.; Agrawal, D.P.

    1983-01-01

    In an attempt to provide a chronology for Indian archaeological sites, an extensive pottery dating programme was initiated during 1978-1979. So far we have provided a chronology for seven important Indian archaeological sites. The dated cultures include: 1) the Ochre Colour Ware culture, 2) the Pre-Harappan culture, 3) the megalithic culture and 4) the Painted Grey Ware culture. A complete survey of recently measured TL dates are presented in a model format similar to that used in Radiocarbon. (author)

  8. How AMS dating changed my life

    International Nuclear Information System (INIS)

    Spriggs, M.

    2001-01-01

    Accelerator mass spectrometry (AMS) radiocarbon dating was developed in the late 1970s. Remembering back to a time before AMS dating was available to archaeologists is a bit like trying to remember how we ever survived without desktop computers, email or automatic teller machines. My own particular interest in AMS dating was an inevitable offshoot from my long-established interest in chronometric hygiene, or 'getting the dates right'. In this paper I attempt to illustrate that accurate dating matters, by discussing some examples of AMS dating projects with which I have been involved over the last six years or so. In relation to these projects, AMS has given us the ability to date sites which we could not before. It has enabled us to provide more detailed stratigraphies when datable materials are rare. It has allowed us to date materials we could not date before, such as rock art pigments. It has been able to provide indications of the degree of site disturbance in the absence of other obvious forms of evidence. And it has allowed us to assess claims for the antiquity of particular material cultural types and faunal introductions. (author). 41 refs

  9. AMS Radiocarbon Dating at Notre Dame

    Science.gov (United States)

    Howard, Sean

    2014-09-01

    Current development of a local radiocarbon dating method using Accelerator Mass Spectrometry (AMS) at the University of Notre Dame seeks to provide sensitive, reproducible, and accurate measurements for future interdisciplinary projects. While AMS has been the premier radiocarbon dating method for a few decades, repurposing Notre Dame's FN Tandem accelerator for radiocarbon dating has provided many unique challenges. Experiments have shown radiocarbon dating possible and reproducible using the FN Tandem accelerator, found optimal settings for said accelerator, and established sensitivity limits comparable to dedicated radiocarbon dating facilities. In addition, there is ongoing work to create a local chemistry lab to convert organic artifacts into graphite samples to be dated locally. Once the chemistry side has been completed, several artifacts from the IAEA's radiocarbon intercomparison have been procured. Dating these previously studied artifacts will provide an additional measure on the accuracy and repeatability of both the accelerator and chemical treatment. Provided that these IAEA artifacts are dated successfully, exciting projects will ensue, such as the authentication of artwork and dating of anthropological samples.

  10. NERC radiocarbon dating: 1975-1985

    International Nuclear Information System (INIS)

    Bowen, D.Q.; Harkness, D.D.

    1986-06-01

    The paper reviews the work of the Natural Environment Research Council Radiocarbon Dating Laboratory in connection with Quaternary research, over the last decade. A description is given of the development of the dating service and in-house research. Quaternary research investigations aided by radiocarbon dating are described under the topic headings: The late Devensian glacial maximum, late glacial, middle Devensian, palaeomagnetic secular variation in lake sediments, vegetational history, faunal history, palaeolimnology, ground water, volcanology, periglacial research, palaoeohydrology, geomorphology, quaternary events in low-latitudes, environmental archaeology, archaeology, deep sea sediments, continental shelf, coastal geomorphology, and radiocarbon dating in Antarctica. (U.K.)

  11. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  12. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  13. Using microwaves in Disinsection of dates

    International Nuclear Information System (INIS)

    Zouba, Anis

    2008-01-01

    The date palm plays a very significant role in Tunisia in term of culture as well as social, economic and ecological aspects. The production of the dates which is estimated to 120.000 tons/year ensures the principal income for the majority of the oasis population of the South of Tunisia and constitutes the basis for agricultural, industrial, commercial and tourist activities, offering million of working days. The date palm is cultivated mainly for the production of dates which are consumed locally or also exported abroad but for its by-products (food of the cattle, wind breaks, fuel, construction) which are marketed and/ or used in the everyday life thus taking part in the sedentarisation of the populations and the maintenance of a fragile socio-economic balance. The date moth, Ectomyelois ceratoniae Zell. ( L will epidoptera, Pyralidae) is without question the most significant problem of the Tunisian date palm. The infestation of dates in the field and in the storage and packing houses enormously depreciates the marketable quality of dates and risk to compromise exports in particular those of the variety Deglet Nour. rates of infestations of about 20% are often recorded in Tunisia where as the European standards require rates lower than 5%. In Tunisia the desinsectisation of dates is done until now by the use of methyl bromide, its high toxicity substantially reduces the duration of date treatment, and consequently the treated volumes. The replacement of this product becomes an urgent need its use will not be authorized by 2015. Within the framework of a agreement between the Regional Research Center in Oasis Agriculture (CRRAO), The Interprofessional Grouping of Fruits (GIF), and the Italian Company IMETEC, the use one of micro-waves as a desinsectisation method of dates was evaluated. The results of this present work showed that total desinsectisation of dates by microwaves can be obtained only with homogeneous dates in term of water content. Total

  14. Production Scheduling in Complex Job Shops from an Industrie 4.0 Perspective: A Review and Challenges in the Semiconductor Industry

    OpenAIRE

    Waschneck, Bernd; Bauernhansl, Thomas; Altenmüller, Thomas; Kyek, Andreas

    2017-01-01

    On the one hand, Industrie 4.0 has recently emerged as the keyword for increasing productivity in the 21st century. On the other hand, production scheduling in a Complex Job Shop (CJS) environment, such as wafer fabrication facilities, has drawn interest of researchers dating back to the 1950s [65, 18]. Although both research areas overlap, there seems to be very little interchange of ideas. This review presents and assesses production scheduling techniques in complex job shops from an Indust...

  15. Chromatographic separation of fructose from date syrup.

    Science.gov (United States)

    Al Eid, Salah M

    2006-01-01

    The objective of this study is to provide a process for separating fructose from a mixture of sugars containing essentially fructose and glucose, obtained from date palm fruits. The extraction procedure of date syrup from fresh dates gave a yield of 86.5% solids after vacuum drying. A process for separating fructose from an aqueous solution of date syrup involved adding the date syrup solutions (20, 30 and 40% by weight) to a chromatographic column filled with Dowex polystyrene strong cation exchange gel matrix resin Ca2 + and divinylbenzene, a functional group, sulfonic acid, particle size 320 microm, with a flow rate of 0.025 and 0.05 bed volume/min, under 30 and 70 degrees C column temperature. After the date sugar solution batch, a calculated quantity of water was added to the column. Glucose was retained by the resin more weakly than fructose and proceeded faster into the water batch flowing ahead. Three fractions were collected: a glucose-rich fraction, a return fraction, and a fructose-rich fraction. The return fraction is based on when the peaks of fructose and glucose were reached, which could be determined by means of an analyzer (polarimeter) based on the property of glucose and fructose solutions to turn the polarization level of polarized light. A high yield of fructose is obtained at 70 degrees C column temperature with a flow rate of 0.025 bed volume/min and date syrup solution containing 40% sugar concentration. The low recovery by weight obtained using date syrup solutions having a sugar concentration of 20 and 30%, encourages the use of a concentration of 40%. However, with the 40% date syrup supply the average concentrations of glucose and fructose in the return fractions were more than 40%, which can be used for diluting the thick date syrup solution extracted from dates.

  16. Online Scheduling in Distributed Message Converter Systems

    NARCIS (Netherlands)

    Risse, Thomas; Wombacher, Andreas; Surridge, Mike; Taylor, Steve; Aberer, Karl

    The optimal distribution of jobs among hosts in distributed environments is an important factor to achieve high performance. The optimal strategy depends on the application. In this paper we present a new online scheduling strategy for distributed EDI converter system. The strategy is based on the

  17. Crane Scheduling on a Plate Storage

    DEFF Research Database (Denmark)

    Hansen, Jesper

    2002-01-01

    OSS produces the worlds largest container ships. The first process of producing the steel ships is handling arrival and storage of steel plates until they are needed in production. Two gantry cranes carry out this task. The planning task is now to create a schedule of movements for the 2 cranes...

  18. Improved human performance through appropriate work scheduling

    International Nuclear Information System (INIS)

    Morisseau, D.S.; Lewis, P.M.; Persensky, J.J.

    1987-01-01

    The Nuclear Regulatory Commission (NRC) has had a policy, Generic Letter 82-12, on hours of work since 1982. The policy states that licensees should establish controls to prevent situations where fatigue could reduce the ability of operating personnel to perform their duties safely (USNRC 1982). While that policy does give guidance on hours of work and overtime, it does not address periods of longer than 7 days or work schedules other than the routine 8-hour day, 40-hour week. Recognizing that NRC policy could provide broader guidance for shift schedules and hours of overtime work, the Division of Human Factors Safety conducted a project with Pacific Northwest Laboratories (PNL) to help the NRC better understand the human factors principles and issues concerning hours of work so that the NRC could consider updating their policy as necessary. The results of this project are recommendations for guidelines and limits for periods of 14 days, 28 days, and 1 year to take into account the cumulative effects of fatigue. In addition, routine 12-hour shifts are addressed. This latter type of shift schedule has been widely adopted in the petroleum and chemical industries and several utilities operating nuclear power plants have adopted it as well. Since this is the case, it is important to consider including guidelines for implementing this type of schedule. This paper discusses the bases for the PNL recommendations which are currently being studied by the NRC

  19. ATD-2 Surface Scheduling and Metering Concept

    Science.gov (United States)

    Coppenbarger, Richard A.; Jung, Yoon Chul; Capps, Richard Alan; Engelland, Shawn A.

    2017-01-01

    This presentation describes the concept of ATD-2 tactical surface scheduling and metering. The concept is composed of several elements, including data exchange and integration; surface modeling; surface scheduling; and surface metering. The presentation explains each of the elements. Surface metering is implemented to balance demand and capacity• When surface metering is on, target times from surface scheduler areconverted to advisories for throttling demand• Through the scheduling process, flights with CTOTs will not get addedmetering delay (avoids potential for ‘double delay’)• Carriers can designate certain flights as exempt from metering holds• Demand throttle in Phase 1 at CLT is through advisories sent to rampcontrollers for pushback instructions to the flight deck– Push now– Hold for an advised period of time (in minutes)• Principles of surface metering can be more generally applied to otherairports in the NAS to throttle demand via spot-release times (TMATs Strong focus on optimal use of airport resources• Flexibility enables stakeholders to vary the amount of delay theywould like transferred to gate• Addresses practical aspects of executing surface metering in aturbulent real world environment• Algorithms designed for both short term demand/capacityimbalances (banks) or sustained metering situations• Leverage automation to enable surface metering capability withoutrequiring additional positions• Represents first step in Tactical/Strategic fusion• Provides longer look-ahead calculations to enable analysis ofstrategic surface metering potential usage

  20. Irrigation scheduling using soil moisture sensors

    Science.gov (United States)

    Soil moisture sensors were evaluated and used for irrigation scheduling in humid region. Soil moisture sensors were installed in soil at depths of 15cm, 30cm, and 61cm belowground. Soil volumetric water content was automatically measured by the sensors in a time interval of an hour during the crop g...