WorldWideScience

Sample records for sat-map-climate project resultssatellite

  1. SAT-MAP-CLIMATE project results[SATellite base bio-geophysical parameter MAPping and aggregation modelling for CLIMATE models

    Energy Technology Data Exchange (ETDEWEB)

    Bay Hasager, C.; Woetmann Nielsen, N.; Soegaard, H.; Boegh, E.; Hesselbjerg Christensen, J.; Jensen, N.O.; Schultz Rasmussen, M.; Astrup, P.; Dellwik, E.

    2002-08-01

    Earth Observation (EO) data from imaging satellites are analysed with respect to albedo, land and sea surface temperatures, land cover types and vegetation parameters such as the Normalized Difference Vegetation Index (NDVI) and the leaf area index (LAI). The observed parameters are used in the DMI-HIRLAM-D05 weather prediction model in order to improve the forecasting. The effect of introducing actual sea surface temperatures from NOAA AVHHR compared to climatological mean values, shows a more pronounced land-sea breeze effect which is also observable in field observations. The albedo maps from NOAA AVHRR are rather similar to the climatological mean values so for the HIRLAM model this is insignicant, yet most likely of some importance in the HIRHAM regional climate model. Land cover type maps are assigned local roughness values determined from meteorological field observations. Only maps with a spatial resolution around 25 m can adequately map the roughness variations of the typical patch size distribution in Denmark. A roughness map covering Denmark is aggregated (ie area-average non-linearly) by a microscale aggregation model that takes the non-linear turbulent responses of each roughness step change between patches in an arbitrary pattern into account. The effective roughnesses are calculated into a 15 km by 15 km grid for the HIRLAM model. The effect of hedgerows is included as an added roughness effect as a function of hedge density mapped from a digital vector map. Introducing the new effective roughness maps into the HIRLAM model appears to remedy on the seasonal wind speed bias over land and sea in spring. A new parameterisation on the effective roughness for scalar surface fluxes is developed and tested on synthetic data. Further is a method for the estimation the evapotranspiration from albedo, surface temperatures and NDVI succesfully compared to field observations. The HIRLAM predictions of water vapour at 12 GMT are used for atmospheric correction of the satellite parameters derived in the afternoon. (au)

  2. SAT-MAP-CLIMATE project results

    DEFF Research Database (Denmark)

    Hasager, C.B.; Nielsen, N.W.; Soegaard, H.

    2002-01-01

    Earth Observation (EO) data from imaging satellites are analysed with respect to albedo, land and sea surface temperatures, land cover types and vegetation parameters such as the Normalized Difference Vegetation Index (NDVI) and the leaf area index (LAI).The observed parameters are used in the DMI...... from albedo, surface temperatures and NDVI succesfully compared to field observations. The HIRLAM predictions of water vapour at 12 GMT are used for atmospheric correction of the satellite parametersderived in the afternoon....

  3. Project 2010 Project Management

    CERN Document Server

    Happy, Robert

    2010-01-01

    The ideal on-the-job reference guide for project managers who use Microsoft Project 2010. This must-have guide to using Microsoft Project 2010 is written from a real project manager's perspective and is packed with information you can use on the job. The book explores using Project 2010 during phases of project management, reveals best practices, and walks you through project flow from planning through tracking to closure. This valuable book follows the processes defined in the PMBOK Guide, Fourth Edition , and also provides exam prep for Microsoft's MCTS: Project 2010 certification.: Explains

  4. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  5. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  6. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  7. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  8. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  9. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... into account. This may require investments in new project management technologies. Originality/value – This paper adds to the literatures on project temporalities and stakeholder theory by connecting them to the question of non-human stakeholders and to project management technologies.......Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...

  10. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  11. Projective Geometry

    Indian Academy of Sciences (India)

    In painting, this point is sometimes referred to as a 'vanishing point'. We will get back to this device called 'central projection' in mathematics a little later. .... The intersection of a curve of degree m and a curve of degree n has ... projective plane, we get a dual theorem on the second projective plane, which for this reason.

  12. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...

  13. OMEGA project

    International Nuclear Information System (INIS)

    Shibuya, E.H.

    1989-01-01

    The OMEGA - Observation of Multiple particle production, Exotic Interactions and Gamma-ray Air Shower-project is presented. The project try to associate photosensitive detectors from experiences of hadronic interactions with electronic detectors used by experiences that investigate extensive atmospheric showers. (M.C.K.)

  14. PROJECT REPORT

    African Journals Online (AJOL)

    medakubu

    We here present a very preliminary report on a field project entitled 'Vanishing. Voices from Ghana's Middle Belt', an Endangered Languages Documentation Project funded by the Endangered Languages Documentation Program based at the School of. Oriental and African Studies, University of London. It is being carried ...

  15. Project Games

    NARCIS (Netherlands)

    Estevez Fernandez, M.A.; Borm, P.E.M.; Hamers, H.J.M.

    2005-01-01

    This paper studies situations in which a project consisting of several activities is not executed as planned.It is divided into three parts.The first part analyzes the case where the activities may be delayed; this possibly induces a delay on the project as a whole with additional costs.Associated

  16. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  17. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  18. Freedom Project

    Directory of Open Access Journals (Sweden)

    Alejandra Suarez

    2014-02-01

    Full Text Available Freedom Project trains prisoners in nonviolent communication and meditation. Two complementary studies of its effects are reported in this article. The first study is correlational; we found decreased recidivism rates among prisoners trained by Freedom Project compared with recidivism rates in Washington state. The second study compared trained prisoners with a matched-pair control group and found improvement in self-reported anger, self-compassion, and certain forms of mindfulness among the trained group. Ratings of role-plays simulating difficult interactions show increased social skills among the group trained by Freedom Project than in the matched controls.

  19. Projective geometry

    CERN Document Server

    Faulkner, Thomas Ewan

    1952-01-01

    This text explores the methods of the projective geometry of the plane. Some knowledge of the elements of metrical and analytical geometry is assumed; a rigorous first chapter serves to prepare readers. Following an introduction to the methods of the symbolic notation, the text advances to a consideration of the theory of one-to-one correspondence. It derives the projective properties of the conic and discusses the representation of these properties by the general equation of the second degree. A study of the relationship between Euclidean and projective geometry concludes the presentation. Nu

  20. Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception......In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception...

  1. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  2. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro...... of 'organising' filled the field of organisation studies with new ideas and intellectual challenges. To take advantage of such developments, organisational scholars had to consider different forms of organising as part of 'organisation studies', and continuously adapt their frames of reference and forms...... by emancipatory interest and the pragmatic desire for changes in the status quo through the reorganisation of inherent contradictions, giving voice to minorities while addressing major economic and social problems. We termed them type 1, type 2 and type 3, respectively.The juxtaposition of levels of analysis...

  3. Projection displays

    Science.gov (United States)

    Chiu, George L.; Yang, Kei H.

    1998-08-01

    Projection display in today's market is dominated by cathode ray tubes (CRTs). Further progress in this mature CRT projector technology will be slow and evolutionary. Liquid crystal based projection displays have gained rapid acceptance in the business market. New technologies are being developed on several fronts: (1) active matrix built from polysilicon or single crystal silicon; (2) electro- optic materials using ferroelectric liquid crystal, polymer dispersed liquid crystals or other liquid crystal modes, (3) micromechanical-based transducers such as digital micromirror devices, and grating light valves, (4) high resolution displays to SXGA and beyond, and (5) high brightness. This article reviews the projection displays from a transducer technology perspective along with a discussion of markets and trends.

  4. Echo project

    DEFF Research Database (Denmark)

    Gfader, Verina; Carson, Rebecca; Kraus, Chris

    2016-01-01

    Echo project (ed. by Verina Gfader and Ruth Höflich) is an online publication and community board that developed from a visit to the Los Angeles Art Book fair in January 2014. It was on the occasion of a prior book project, titled Prospectus, that the editorial team had been invited by the LAABF...... team to both present the printed matter in the format of running a book stall, and stage a discursive event at the Classroom. Echo reverberates some of the encounters and debates there, with new commissioned chapters propelling a ongoing correspondence across urban environs: An essay on the General...

  5. Project Narrative

    Energy Technology Data Exchange (ETDEWEB)

    Driscoll, Mary C. [St. Bonaventure University, St Bonaventure, NY(United States)

    2012-07-12

    The Project Narrative describes how the funds from the DOE grant were used to purchase equipment for the biology, chemistry, physics and mathematics departments. The Narrative also describes how the equipment is being used. There is also a list of the positive outcomes as a result of having the equipment that was purchased with the DOE grant.

  6. Projection Methods

    DEFF Research Database (Denmark)

    Wagner, Falko Jens; Poulsen, Mikael Zebbelin

    1999-01-01

    When trying to solve a DAE problem of high index with more traditional methods, it often causes instability in some of the variables, and finally leads to breakdown of convergence and integration of the solution. This is nicely shown in [ESF98, p. 152 ff.].This chapter will introduce projection...

  7. Hydrology Project

    International Nuclear Information System (INIS)

    Anon.

    Research carried out in the 'Hydrology Project' of the Centro de Energia Nuclear na Agricultura', Piracicaba, Sao Paulo State, Brazil, are described. Such research comprises: Amazon hydrology and Northeast hydrology. Techniques for the measurement of isotope ratios are used. (M.A.) [pt

  8. Project Lifescape

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 4; Issue 8. Project Lifescape – An Invitation. Madhav Gadgil. Classroom Volume 4 Issue 8 August 1999 pp 80-90. Fulltext. Click here to view fulltext PDF. Permanent link: https://www.ias.ac.in/article/fulltext/reso/004/08/0080-0090. Author Affiliations.

  9. Project Avatar

    DEFF Research Database (Denmark)

    Juhlin, Jonas Alastair

    'Project Avatar' tager udgangspunkt i den efterretningsdisciplin, der kaldes Open Source Intelligence og indebærer al den information, som ligger frit tilgængeligt i åbne kilder. Med udbredelsen af sociale medier åbners der op for helt nye typer af informationskilder. Spørgsmålet er; hvor nyttig er...

  10. FLOAT Project

    DEFF Research Database (Denmark)

    Sørensen, Eigil V.; Aarup, Bendt

    The objective of the FLOAT project is to study the reliability of high-performance fibre-reinforced concrete, also known as Compact Reinforced Composite (CRC), for the floats of wave energy converters. In order to reach a commercial breakthrough, wave energy converters need to achieve a lower price...

  11. Project Baltia

    Index Scriptorium Estoniae

    2007-01-01

    Uus arhitektuuriajakiri "Project Baltia" tutvustab Baltimaade, Soome ja Peterburi regiooni arhitektuuri, linnaehitust ja disaini. Ilmub neli korda aastas inglise- ja venekeelsena. Väljaandja: kirjastus Balticum Peterburis koostöös Amsterdami ja Moskva kirjastusega A-Fond. Peatoimetaja Vladimir Frolov

  12. Project COLD.

    Science.gov (United States)

    Kazanjian, Wendy C.

    1982-01-01

    Describes Project COLD (Climate, Ocean, Land, Discovery) a scientific study of the Polar Regions, a collection of 35 modules used within the framework of existing subjects: oceanography, biology, geology, meterology, geography, social science. Includes a partial list of topics and one activity (geodesic dome) from a module. (Author/SK)

  13. Project Success.

    Science.gov (United States)

    Baehr, Rufus F.

    This report reviews the remedial education program--Project Success--at the Urban Education Center, City Colleges of Chicago (Illinois). The major features of the program are outlined and its operation and evaluation are discussed. Student performance and characteristics are then tabularly compared, based on their groupings as…

  14. Radiochemistry Project

    International Nuclear Information System (INIS)

    Anon.

    Researches carried out in the 'Radiochemistry Project' of the Agricultural Nuclear Energy Center, Piracicaba, Sao Paulo State, Brazil, are described. Such researches comprise: dosimetry and radiological protection; development of techniques and methods of chemical analysis and radiochemistry. (M.A.) [pt

  15. THE PROJECT

    Directory of Open Access Journals (Sweden)

    P.M. Latyshev

    2008-09-01

    Full Text Available "Urals Industrial - Urals Polar" is the unique project and thus it will provide the economic security not only of the local territory but of the whole Russia in terms of several courses. This article is devoted to the main courses of these ones and their influence on the economy of the country.

  16. Project Reconstruct.

    Science.gov (United States)

    Helisek, Harriet; Pratt, Donald

    1994-01-01

    Presents a project in which students monitor their use of trash, input and analyze information via a database and computerized graphs, and "reconstruct" extinct or endangered animals from recyclable materials. The activity was done with second-grade students over a period of three to four weeks. (PR)

  17. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  18. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  19. Hydropower Projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

  20. Project Prometheus

    Science.gov (United States)

    Johnson, Steve

    2003-01-01

    Project Prometheus will enable a new paradigm in the scientific exploration of the Solar System. The proposed JIMO mission will start a new generation of missions characterized by more maneuverability, flexibility, power and lifetime. Project Prometheus organization is established at NASA Headquarters: 1.Organization established to carry out development of JIMO, nuclear power (radioisotope), and nuclear propulsion research. 2.Completed broad technology and national capacity assessments to inform decision making on planning and technology development. 3.Awarded five NRA s for nuclear propulsion research. 4.Radioisotope power systems in development, and Plutonium-238 being purchased from Russia. 5.Formulated science driven near-term and long-term plan for the safe utilization of nuclear propulsion based missions. 6.Completed preliminary studies (Pre-Phase A) of JIMO and other missions. 7.Initiated JIMO Phase A studies by Contractors and NASA.

  1. PARTNER Project

    CERN Document Server

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    Hadrontherapy uses particle beams to treat tumours located near critical organs and tumours that respond poorly to conventional radiation therapy. It has become evident that there is an emerging need for reinforcing research in hadrontherapy and it is essential to train professionals in this rapidly developing field. PARTNER is a 4-year Marie Curie Training project funded by the European Commission with 5.6 million Euros aimed at the creation of the next generation of experts. Ten academic institutes and research centres and two leading companies are participating in PARTNER, that is coordinated by CERN, forming a unique multidisciplinary and multinational European network. The project offers research and training opportunities to 25 young biologists, engineers, physicians and physicists and is allowing them to actively develop modern techniques for treating cancer in close collaboration with leading European Institutions. For this purpose PARTNER relies on cutting edge research and technology development, ef...

  2. Project Radon

    International Nuclear Information System (INIS)

    Ekholm, S.

    1988-01-01

    The project started in March 1987. The objective is to perform radon monitoring in 2000 dwellings occupied by people employed by State Power Board and to continue to contribute to the development of radon filters. The project participates in developing methods for radon measurement and decontamination and in adapting the methods to large scale application. About 400 so called radon trace measurements (coarse measurement) and about 10 action measurements (decontamination measurement) have been made so far. Experience shows that methods are fully applicable and that the decontamination measures recommended give perfectly satisfactory results. It is also established that most of the houses with high radon levels have poor ventilation Many of them suffer from moisture and mould problems. The work planned for 1988 and 1989 will in addition to measurements be directed towards improvement of the measuring methods. An activity catalogue will be prepared in cooperation with ventilation enterprises. (O.S.)

  3. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  4. Project Phaseolus

    International Nuclear Information System (INIS)

    Anon.

    Research carried out through the Phaseolus Project of the 'Centro de Energia Nuclear na Agricultura' (CENA) Piracicaba, Sao Paulo State, Brazil, is described. It comprises the following subject s: plant breeding; nitrogen fixation; tissue cultures; proteins; photosynthetic efficiency; soil-plant interactions; electron microscopy of the golden mosaic virus; pest control; production of 15 N-enriched ammonium sulfate, and determination of elements in the beans plant. (M.A.) [pt

  5. ARTIST Project

    CSIR Research Space (South Africa)

    Ferguson, K

    2012-10-01

    Full Text Available Biennial Conference Presented by: Keith Ferguson Date: 9 October 2012 Mobile IPTV Broadcasting Platform Consortium: CSIR, UCT, ECA Funded by TIA 2008-2011 ARTIST Project Min time - sacrifice quality Max quality - sacrifice time Application Context... delay tolerance network dependency file download and play file streaming live broadcast peer to peer Online Video Shop e.g. Netflix Video-On-Demand e.g. YouTube Videoconferencing e.g. Skype ARTIST ? Adaptive Real-Time Internet Streaming...

  6. CARA project

    International Nuclear Information System (INIS)

    Bergallo, Juan E.; Brasnarof, Daniel O.

    2000-01-01

    The CARA (Advanced Fuels for Argentine Reactors) Project successfully completed its first stage, phase one, last year. The performance of this fuel has been partially examined, using CNEA and CONUAR facilities and personnel. With the results obtained in this stage, determined by the corresponding tests and verification of the fuel behavior, the performance of the second stage started immediately afterwards. Works performed and results obtained during the development of the second stage are generally described in this paper. (author)

  7. SUPERSITE PROJECT

    Directory of Open Access Journals (Sweden)

    Silvia Ferrari

    2010-04-01

    Full Text Available The project is focused on a detailed study of some chemical, physical and toxicological parameters and on health, epidemiological and environmental assessment by interpretative models, in the atmosphere of Emilia-Romagna (Italy. The project rises from the necessity to improve  knowledge about environmental and health aspects of fine and ultrafine particles, in primary and secondary components, in the atmosphere. The project, structured in 7 workpackages, is organized in two measurement programmes: the routine one that has a mainly daily time resolution, and the intensive one with high time resolution and a higher chemical speciation than the routine one. The sampling sites are five: three in urban areas (Bologna, Parma and Rimini, one in a rural area (San Pietro Capofiume and one in a remote area (Monte Cimone. Parallel to outdoor studies, a workpackage  is planned for indoor studies and chemical composition analysis with the  outdoor/indoor ratio for characterizing indoor human exposure to outdoor pollution.

  8. Coloss project

    International Nuclear Information System (INIS)

    2005-01-01

    The COLOSS project was a shared-cost action, co-ordinated by IRSN within the Euratom Research Framework Programme 1998-2002. Started in February 2000, the project lasted three years. The work-programme performed by 19 partners was shaped around complementary activities aimed at improving severe accident codes. Unresolved risk-relevant issues regarding H2 production, melt generation and the source term were studied, through a large number of experiments such as a) dissolution of fresh and high burn-up UO 2 and MOX by molten Zircaloy, b) simultaneous dissolution of UO 2 and ZrO 2 by molten Zircaloy, c) oxidation of U-O-Zr mixtures by steam, d) degradation-oxidation of B 4 C control rods. Significant results have been produced from separate-effects, semi-global and large-scale tests on COLOSS topics. Break-through were achieved on some issues. Nevertheless, more data are needed for consolidation of the modelling on burn-up effects on UO 2 and MOX dissolution and on oxidation of U-O-Zr and B 4 C-metal mixtures. There was experimental evidence that the oxidation of these mixtures can contribute significantly to the large H2 production observed during the reflooding of degraded cores under severe accident conditions. Based on the experimental results obtained on the COLOSS topics, corresponding models were developed and were successfully implemented in several severe accident codes. Upgraded codes were then used for plant calculations to evaluate the consequences of new models on key severe accident sequences occurring in different plants designs involving B 4 C control rods (EPR, BWR, VVER- 1000) as well as in the TMI-2 accident. The large series of plant calculations involved sensitivity studies and code benchmarks. Main severe accident codes in use in the EU for safety studies were used such as ICARE/CATHARE, SCDAP/RELAP5, ASTEC, MELCOR and MAAP4. This activity enabled: a) the assessment of codes to calculate core degradation, b) the identification of main

  9. Demonstration projects

    International Nuclear Information System (INIS)

    Robertson, R.F.S.

    1976-01-01

    A discussion of some of the projects in Canada planned to demonstrate the technical and economic feasibility of processes using waste heat. Most of the studies are in the planning stage; few field demonstrations are yet in operation in any of the three arbitrary categories of waste heat - high-grade heat (100-200 deg C), medium-grade heat (30-100 deg C), and low-grade heat (below 30 deg C). The survey indicates that, while there is long-term potential in several of the approaches, the time has arrived to start finding some hard facts. (author)

  10. Projective mapping

    DEFF Research Database (Denmark)

    Dehlholm, Christian; Brockhoff, Per B.; Bredie, Wender Laurentius Petrus

    2012-01-01

    the applied framework, semantic restrictions, the choice of type of assessors and the validation of product separations. The applied framework concerns the response surface as presented to the assessor in different shapes, e.g. rectangular, square or round. Semantic restrictions are a part of the assessor...... instructions and influence heavily the product placements and the descriptive vocabulary (Dehlholm et.al., 2012b). The type of assessors performing the method influences results with an extra aspect in Projective Mapping compared to more analytical tests, as the given spontaneous perceptions are much dependent...

  11. Project Exodus

    Science.gov (United States)

    1990-01-01

    Project Exodus is an in-depth study to identify and address the basic problems of a manned mission to Mars. The most important problems concern propulsion, life support, structure, trajectory, and finance. Exodus will employ a passenger ship, cargo ship, and landing craft for the journey to Mars. These three major components of the mission design are discussed separately. Within each component the design characteristics of structures, trajectory, and propulsion are addressed. The design characteristics of life support are mentioned only in those sections requiring it.

  12. PORTNUS Project

    Energy Technology Data Exchange (ETDEWEB)

    Loyal, Rebecca E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-07-14

    The objective of the Portunus Project is to create large, automated offshore ports that will the pace and scale of international trade. Additionally, these ports would increase the number of U.S. domestic trade vessels needed, as the imported goods would need to be transported from these offshore platforms to land-based ports such as Boston, Los Angeles, and Newark. Currently, domestic trade in the United States can only be conducted by vessels that abide by the Merchant Marine Act of 1920 – also referred to as the Jones Act. The Jones Act stipulates that vessels involved in domestic trade must be U.S. owned, U.S. built, and manned by a crew made up of U.S. citizens. The Portunus Project would increase the number of Jones Act vessels needed, which raises an interesting economic concern. Are Jones Act ships more expensive to operate than foreign vessels? Would it be more economically efficient to modify the Jones Act and allow vessels manned by foreign crews to engage in U.S. domestic trade? While opposition to altering the Jones Act is strong, it is important to consider the possibility that ship-owners who employ foreign crews will lobby for the chance to enter a growing domestic trade market. Their success would mean potential job loss for thousands of Americans currently employed in maritime trade.

  13. FLORAM project

    Energy Technology Data Exchange (ETDEWEB)

    Zulauf, W.E. [Sao Paolos Environmental Secretariat, Sao Paolo (Brazil); Goelho, A.S.R. [Riocell, S.A. (Brazil); Saber, A. [IEA-Instituto de Estudos Avancados (Brazil)] [and others

    1995-12-31

    The project FLORAM was formulated at the `Institute for Advanced Studies` of the University of Sao Paulo. It aims at decreasing the level of carbon dioxide in the atmosphere and thus curbing the green-house effect by way of a huge effort of forestation and reforestation. The resulting forests when the trees mature, will be responsible for the absorption of about 6 billion tons of excess carbon. It represents 5 % of the total amount of CO{sub 2} which is in excess in the earth`s atmosphere and represents 5 % of the available continental surfaces which can be forested as well. Therefore, if similar projects are implemented throughout the world, in theory all the exceeding CO{sub 2}, responsible for the `greenhouse effect`, (27 % or 115 billion tons of carbon) would be absorbed. Regarding this fact, there would be a 400 million hectar increase of growing forests. FLORAM in Brazil aims to plant 20.000.000 ha in 2 years at a cost of 20 billion dollars. If it reaches its goals that will mean that Brazil will have reforested an area almost half as big as France. (author)

  14. SISCAL project

    Science.gov (United States)

    Santer, Richard P.; Fell, Frank

    2003-05-01

    The first "ocean colour" sensor, Coastal Zone Color Scanner (CZCS), was launched in 1978. Oceanographers learnt a lot from CZCS but it remained a purely scientific sensor. In recent years, a new generation of satellite-borne earth observation (EO) instruments has been brought into space. These instruments combine high spectral and spatial resolution with revisiting rates of the order of one per day. More instruments with further increased spatial, spectral and temporal resolution will be available within the next years. In the meantime, evaluation procedures taking advantage of the capabilities of the new instruments were derived, allowing the retrieval of ecologically important parameters with higher accuracy than before. Space agencies are now able to collect and to process satellite data in real time and to disseminate them via the Internet. It is therefore meanwhile possible to envisage using EO operationally. In principle, a significant demand for EO data products on terrestrial or marine ecosystems exists both with public authorities (environmental protection, emergency management, natural resources management, national parks, regional planning, etc) and private companies (tourist industry, insurance companies, water suppliers, etc). However, for a number of reasons, many data products that can be derived from the new instruments and methods have not yet left the scientific community towards public or private end users. It is the intention of the proposed SISCAL (Satellite-based Information System on Coastal Areas and Lakes) project to contribute to the closure of the existing gap between space agencies and research institutions on one side and end users on the other side. To do so, we intend to create a data processor that automatically derives and subsequently delivers over the Internet, in Near-Real-Time (NRT), a number of data products tailored to individual end user needs. The data products will be generated using a Geographical Information System (GIS

  15. ENVISION Project

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    Hadrontherapy is a highly advanced technique of cancer radiotherapy that uses beams of charged particles (ions) to destroy tumour cells. While conventional X-rays traverse the human body depositing radiation as they pass through, ions deliver most of their energy at one point. Hadrontherapy is most advantageous once the position of the tumour is accurately known, so that healthy tissues can be protected. Accurate positioning is a crucial challenge for targeting moving organs, as in lung cancer, and for adapting the irradiation as the tumour shrinks with treatment. Therefore, quality assurance becomes one of the most relevant issues for an effective outcome of the cancer treatment. In order to improve the quality assurance tools for hadrontherapy, the European Commission is funding ENVISION, a 4-year project that aims at developing solutions for: real-• time non invasive monitoring • quantitative imaging • precise determination of delivered dose • fast feedback for optimal treatment planning • real-t...

  16. Project: Ultracentrifuges

    International Nuclear Information System (INIS)

    Olea C, O.

    1990-07-01

    The trans elastic ultracentrifuge of magnetic suspension, is an instrument that arose of an interdisciplinary group directed by the Dr. James Clark Keith where it was projected, designed and built a centrifuge that didn't exist, to be applied in forced diffusion of uranium, like one of the many application fields. The written present, has as purpose to give to know the fundamental physical principles of this technology, its fundamental characteristics of design, the application of this in the separation process of isotopes, as well as the previous studies and essential control parameters in the experimental processes, the same thing that, the most outstanding results and the detection systems used in the confirmation and finally, the carried out potential applications of the principles of the ultracentrifugation technology. (Author)

  17. EUROTRAC projects

    International Nuclear Information System (INIS)

    Slanina, J.; Arends, B.G.; Wyers, G.P.

    1992-07-01

    The projects discussed are BIATEX (BIosphere-ATmosphere EXchange of pollutants), ACE (Acidity in Clouds Experiment) and GCE (Ground-based Cloud Experiment). ECN also coordinates BIATEX and contributes to the coordination of EUROTRAC. Research in BIATEX is aimed at the development of equipment, by which atmosphere-surface interactions of air pollution can be quantified. A ion chromatograph, connected to a rotating denuder, is developed to be applicated in the field for on-line analysis of denuder extracts and other samples. To investigate dry deposition of ammonia a continuous-flow denuder has been developed. A thermodenuder system to measure the concentrations of HNO 3 and NH 4 NO 3 in the ambient air is optimized to determine depositions and is part of the ECN monitoring station in Zegveld, Netherlands. An aerosol separation technique, based on a cyclone separator, has also been developed. All this equipment has been used in field experiments above wheat and heather. An automated monitoring station for long-term investigations of NH 3 , HNO 3 and SO 2 dry deposition on grassland and the impact of the deposition on the presence and composition of water films has been set up and fully tested. Research in GCE concerns the uptake and conversion of air pollution in clouds (cloud chemistry). Measuring equipment from several collaborative institutes has been specified and calibrated in a cloud chamber at ECN. The ECN contribution is the determination of the gas phase composition and the micro-physical characterization of the clouds. Measurement campaigns were carried out in the Po area (Italy) in fog, and in Kleiner Feldberg near Frankfurt, Germany, in orographic clouds. Estimations are given of the deposition of fog water and cloud water on forests in the Netherlands and the low mountain range in Germany. The project ACE was not started because of financial reasons and will be reconsidered. 26 figs., 1 tab., 3 apps., 34 refs

  18. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  19. Project LASER

    Science.gov (United States)

    1990-01-01

    NASA formally launched Project LASER (Learning About Science, Engineering and Research) in March 1990, a program designed to help teachers improve science and mathematics education and to provide 'hands on' experiences. It featured the first LASER Mobile Teacher Resource Center (MTRC), is designed to reach educators all over the nation. NASA hopes to operate several MTRCs with funds provided by private industry. The mobile unit is a 22-ton tractor-trailer stocked with NASA educational publications and outfitted with six work stations. Each work station, which can accommodate two teachers at a time, has a computer providing access to NASA Spacelink. Each also has video recorders and photocopy/photographic equipment for the teacher's use. MTRC is only one of the five major elements within LASER. The others are: a Space Technology Course, to promote integration of space science studies with traditional courses; the Volunteer Databank, in which NASA employees are encouraged to volunteer as tutors, instructors, etc; Mobile Discovery Laboratories that will carry simple laboratory equipment and computers to provide hands-on activities for students and demonstrations of classroom activities for teachers; and the Public Library Science Program which will present library based science and math programs.

  20. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  1. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  2. Organizations, projects and culture

    NARCIS (Netherlands)

    J. van Cleeff; Pieter van Nispen tot Pannerden

    2016-01-01

    Purpose: to explore and demonstrate the effects of organizational culture on projects, in particular project culture and project management style. Methodology/approach: descriptive and explorative; through students’ groups. Findings: the cultural relationship between organizations, their projects

  3. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  4. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  5. Storytelling in Projects

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas; Andersen, Peter Bøgh

    2006-01-01

    project managers should not only be concerned with project plans, but also with project stories. In this paper we explore some basic principles for transforming project plans into appealing stories. We discuss what may happen to stories once they are released into public space. And we illustrate how......Plans and stories are two different ways of communicating about projects. Project plans are formalized descriptions, primarily supporting coordination. Project stories are accounts whose primary function is emotional appeal. Project stories influence the projects’ chances of success. Therefore...... the possibilities of telling favorable stories may have repercussions on the project planning....

  6. Capital projects coordination

    Directory of Open Access Journals (Sweden)

    Zubović Jovan

    2004-01-01

    Full Text Available This paper looks at the difficulties of managing modem capital projects and endeavors to reduce the complexities to simpler and more understandable terms. It examines the project environment, defines project management and discusses points of difference from traditional management. In the second part of the paper are presented fundamentals for project success for different types of projects.

  7. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Projec...

  8. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    , the Aromatic Plants Project, RAPSUD, the Medicinal Plants Project, the Ethnobotany Project, as well as the project of producing an atlas of the potential natural vegetation of Ethiopia. The projects have resulted in many publications and a significant number of graduate students at MSc- and PHd-levels. After...

  9. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  10. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  11. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  12. PROJECT MANAGEMENT AND THE PROJECT MANAGER: A ...

    African Journals Online (AJOL)

    Anyanwu, C. I.. Department of Project Management Technology. School of Management Technology. Federal University of Technology, PMB 1526, Owerri. Abstract. This study was undertaken to establish how project management and the project manager can be used as a panacea for preventing building and.

  13. I-15 North Project

    Science.gov (United States)

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  14. MANAGING MULTICULTURAL PROJECT TEAMS

    OpenAIRE

    Cezar SCARLAT; Carmen-Laura ZARZU; Adriana PRODAN

    2014-01-01

    The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA) projects versus information technology (IT) projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and diff...

  15. Aquaculture project formulation

    National Research Council Canada - National Science Library

    Insull, David; Nash, Colin E

    1990-01-01

    .... The first part of the document contains a broad introduction to project formulation, describing the integration of aquaculture projects within development plans, the organization and management...

  16. Project 2010 Bible

    CERN Document Server

    Marmel, Elaine

    2010-01-01

    A comprehensive reference on the latest version of the leading enterprise project management software: Microsoft Project 2010. Microsoft Project allows users to manage business activities effectively by sharing project information, performing modeling and scenario analyses, standardizizing reporting processes, and more. This soup-to-nuts reference covers both the professional and standard versions of the latest iteration of Microsoft Project, as well as Project Server, so that you can efficiently manage your business projects. Veteran author Elaine Marmel begins with an overview of project man

  17. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  18. USAID Anticorruption Projects Database

    Data.gov (United States)

    US Agency for International Development — The Anticorruption Projects Database (Database) includes information about USAID projects with anticorruption interventions implemented worldwide between 2007 and...

  19. The virtual GULLIVER project

    NARCIS (Netherlands)

    Trappl, R.; Nijholt, Antinus; Stuk, M.; Zwiers, Jakob

    2002-01-01

    In this paper we discuss our virtual reality project Gulliver. This project is part of a more comprehensive project conceived by two artists, Matjaž Štuk and Alena Hudcovicová, called “Gulliver’s Museum of Living Art��?. Our part of the project involves a virtual reality version of Swift’s Gulliver

  20. Determinants of project success

    Science.gov (United States)

    Murphy, D. C.; Baker, B. N.; Fisher, D.

    1974-01-01

    The interactions of numerous project characteristics, with particular reference to project performance, were studied. Determinants of success are identified along with the accompanying implications for client organization, parent organization, project organization, and future research. Variables are selected which are found to have the greatest impact on project outcome, and the methodology and analytic techniques to be employed in identification of those variables are discussed.

  1. Innovations in project activities

    Directory of Open Access Journals (Sweden)

    Serbskaya O.V.

    2016-11-01

    Full Text Available this article considers the ways of project management, models of project management: classical model and the model of flexible designing Agile, pays more attention to the process of project management using Agile model and to the problems of using the project management models in modern conditions.

  2. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...... important qualifications for the understanding of the contributions and results established in the project....

  3. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  4. Projects as value constellations

    DEFF Research Database (Denmark)

    Laursen, Markus

    Creating value has been outlined as very central to projects applying the organizational perspective to projects. It has been suggested that value is created in value constellations or project networks, where actors work together to create value. However, research on the value creation process...... in value constellations is scarce, and through an exploratory study of two project networks in a cultural setting we investigate how value is created in value constellations. We outline how each project may be a distinct type of value constellation, one project creates value for the partners of the network...... as a consortium, and the project creates value primarily for others as a facilitator....

  5. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two ...... important qualifications for the understanding of the contributions and results established in the project.......In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...

  6. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  7. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  8. IT Project Management Metrics

    OpenAIRE

    Paul POCATILU

    2007-01-01

    Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  9. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  10. Appraising operating projects

    International Nuclear Information System (INIS)

    Bodington, J.C.

    1991-01-01

    This article addresses the evaluation of power projects for the purpose of determining their marketability. The topics of the article include deciding to sell, reasons to buy, appraising a project, determining worth of the project assets as well as the operating project itself, and negotiating the deal. With a comprehensive understanding of a project's worth, and strict attention to the details of a sales agreement, ownership of operating independent energy facilities can be transferred with maximum benefit for both buyer and seller

  11. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  12. Testing in agile projects

    OpenAIRE

    Košťál, Ondřej

    2017-01-01

    This thesis deals with the description of software testing in agile projects. Unlike the traditionally managed projects, testing in agile projects is not a discrete phase. In agile managed projects, testing is integrated into the entire development process. Testing takes place continuously throughout the project to ensure frequent delivery of valuable software in short development cycles. The aim of this diploma thesis is to create a comprehensive description of software testing in agile proj...

  13. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    Selecting the right IT projects is increasingly important for many organizations. Project portfolio managers play a key role during project selection, but even though they have a great impact on the selection process, we have little knowledge about how they decide which projects to recommend...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project...... for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...

  14. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  15. Information systems project management

    CERN Document Server

    Olson, David

    2014-01-01

    Information Systems Project Management addresses project management in the context of information systems. It deals with general project management principles, with focus on the special characteristics of information systems. It is based on an earlier text, but shortened to focus on essential project management elements.This updated version presents various statistics indicating endemic problems in completing information system projects on time, within budget, at designed functionality. While successful completion of an information systems project is a challenge, there are some things that ca

  16. Overview about project planning

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2012-12-01

    Full Text Available The purpose of this article is to present the main aspects regarding project planning. This study is generally based on the fourth edition of the Guide to the Project Management Body of Knowledge (PMBOK Guide developed by the Project Management Institute (PMI in 2008. According to this edition of PMBOK, project planning involves a group of processes required to establish the scope of the project, refine the objectives, and define the actions that must be undertaken to attain the objectives of the project.

  17. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  18. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  19. Capital Projects Application (CPA)

    Data.gov (United States)

    General Services Administration — Capital Projects application (CPA) provides users with the ability to maintain project related financial data for Budget Activity (BA) 51, 55, 64, 01, 02, 03, 04....

  20. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  1. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  2. Improved Mass Spectrometer Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Improved Mass Spectrometer project will develop system requirements and analyze the path to space qualification.   The results of this project...

  3. Architectural project and research

    DEFF Research Database (Denmark)

    Lotz, Katrine

    2005-01-01

    Discussion of criterias for research including the researchers or designers own project as theme.......Discussion of criterias for research including the researchers or designers own project as theme....

  4. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  5. Collaborative Contracting in Projects

    NARCIS (Netherlands)

    Suprapto, M.

    2016-01-01

    Project practitioners have increasingly recognized the importance of collaborative relationships to ensure successful executions of projects. However, the ability to sustain and consistenly drive real collaborative attitudes and behavior for achieving the desired outcomes remains of enduring

  6. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  7. Project Tasks in Robotics

    DEFF Research Database (Denmark)

    Sørensen, Torben; Hansen, Poul Erik

    1998-01-01

    Description of the compulsary project tasks to be carried out as a part of DTU course 72238 Robotics......Description of the compulsary project tasks to be carried out as a part of DTU course 72238 Robotics...

  8. The Phebus FP project

    International Nuclear Information System (INIS)

    Delchambre, P.; Von der Hardt, P.

    1989-01-01

    This report summarizes the pre-project studies concerning the PHEBUS FP facility. After recalling the programme objectives, it describes the projected modifications to the PHEBUS reactor, outlines new installations and justifies the selected options

  9. The Alzheimer's Project

    Science.gov (United States)

    ... Navigation Bar Home Current Issue Past Issues The Alzheimer's Project Past Issues / Spring 2009 Table of Contents ... of this page please turn Javascript on. The Alzheimer's Project A 4-Part Documentary Series Starting May ...

  10. BioProject

    Data.gov (United States)

    U.S. Department of Health & Human Services — The BioProject database provides an organizational framework to access information about research projects with links to data that have been or will be deposited...

  11. CHP Project Development

    Science.gov (United States)

    Access information and tools to support the CHP project development process, including identifying if your facility is a good fit for CHP, the steps involved with CHP project development, and policies and incentives supportive of CHP.

  12. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  13. Managing clinical improvement projects.

    Science.gov (United States)

    Phillips, Joanna; Simmonds, Lorraine

    This paper, the second of a three-part series looking at change management tools, provides a practical guide on how to use common project management principles in practice. Much of the literature on project management focuses on the business arena, with little reference to clinical settings. Identifying this literature and understanding its relevance to managing projects in healthcare can be difficult. This article provides a practical guide to identifying the key principles of good project management and applying these in health settings.

  14. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  15. The Dwarf Project: Vidojevica

    Science.gov (United States)

    Vince, O.

    2013-05-01

    The DWARF project is an important international project for observing eclipsing binary stars and searching for third companion which orbit around both stars. Recently, a group of researchers at the Astronomical Observatory of Belgrade joined this project using the 60 cm telescope at the Astronomical Station Vidojevica for observations. All the equipment and the human potential involved with this project from Serbia will be described in this paper.

  16. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  17. Agile & Distributed Project Management

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2011-01-01

    Scrum has gained surprising momentum as an agile IS project management approach. An obvious question is why Scrum is so useful? To answer that question we carried out a longitudinal study of a distributed project using Scrum. We analyzed the data using coding and categorisation and three carefully...... and coordination mechanisms by allowing both local and global articulation of work in the project. That is why Scrum is especially useful for distributed IS project management and teamwork....

  18. Project mechanisms challenges

    International Nuclear Information System (INIS)

    Perthuis, Ch. de

    2005-06-01

    The project mechanism complete the quotas systems concerning the carbon dioxide emissions market. The author explains and discusses these mechanisms and provides a panorama of the existing and developing projects. More specially she brings information on the mechanism of clean developments and renewable energies, the coordinated mechanisms, the agricultural projects, the financing of the projects and the exchange systeme of the New south Wales. (A.L.B.)

  19. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  20. Humane Education Projects Handbook.

    Science.gov (United States)

    Junior League of Ogden, UT.

    This handbook was developed to promote interest in humane education and to encourage the adoption of humane education projects. Although specifically designed to assist Junior Leagues in developing such projects, the content should prove valuable to animal welfare organizations, zoos, aquariums, nature centers, and other project-oriented groups…

  1. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...

  2. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  3. Solving Equations Applet Project

    OpenAIRE

    Thatcher, Kimberly

    2011-01-01

    The purpose of this paper is to summarize a Masters Project for the MMath Degree. The purpose of the project was to create and evaluate an applet that maintains the advantages of the existent manipulatives (Hands-On Equations® and the NLVM applet) while also overcoming the limitations of each. Another product of this project is accompanying lesson plans for teachers.

  4. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  5. Building Project Competence

    DEFF Research Database (Denmark)

    Pemsel, Sofia; Wiewiora, Anna

    This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how...... of dynamic capability building promoting project competence development....

  6. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  7. The Eggen Card Project

    Science.gov (United States)

    Silvis, G.

    2014-06-01

    (Abstract only) Olin Eggen, noted astronomer (1919-1998), left to us all his raw observation records recorded on 3x5 cards. This project is to make all this data available as an online resource. History and progress of the project will be presented. Project details available at: https://sites.google.com/site/eggencards/home.

  8. Mayan Forest Road Projects

    DEFF Research Database (Denmark)

    Conde, Dalia Amor

    2008-01-01

    Road-building projects in the Mayan Biosphere Reserve to connect Mexico and Guatemala were subjected to a cost-benefit evaluation. Up to an estimated 311,000 hectares of jaguar habitat were found to be at risk of deforestation due to these projects. Some of the projects were shown to have negative...

  9. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  10. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  11. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  12. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    The project sponsor can promote information technology (IT) project success in several ways, yet many projects either have no formally designated project sponsor or the project sponsor is confused about his/her...

  13. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  14. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  15. Project Decision Chain

    DEFF Research Database (Denmark)

    Rolstadås, Asbjørn; Pinto, Jeffrey K.; Falster, Peter

    2015-01-01

    To add value to project performance and help obtain project success, a new framework for decision making in projects is defined. It introduces the project decision chain inspired by the supply chain thinking in the manufacturing sector and uses three types of decisions: authorization, selection......, and plan decision. A primitive decision element is defined where all the three decision types can be accommodated. Each task in the primitive element can in itself contain subtasks that in turn will comprise new primitive elements. The primitive elements are nested together in a project decision chain....

  16. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  17. Map Projection Transitions

    Directory of Open Access Journals (Sweden)

    Nedjeljko Frančula

    2013-06-01

    Full Text Available Map Projection Transitions is a very successful web application about map projections. The web page (http://www.jasondavies.com/maps/transition pre­sents a world map with graticule and country borders in the oblique Aitoff projection, with the South Pole. The map is not static, but animated. The South Pole moves toward the bottom and Earth rotates around its poles. The animation lasts five seconds, after which the projection changes and movement continues for five seconds, after which the projection changes again. Names of projections appear in a separate window. There are a total of 56 projections. The South Pole eventually becomes invisible and the North Pole appears at the top. Various parts of Earth appear in the center of the map by rotating around the poles.

  18. The Project of Success

    DEFF Research Database (Denmark)

    Kreiner, Kristian

    . To the extent that project success becomes a matter of meeting the explicit targets, it loses its relevance as independent phenomenon. For that reason, perhaps, project success is hardly ever discussed in the project management literature. However, empirical studies demonstrate that project success is a much...... more complicated matter than meeting targets. While success may ultimately be justified in terms of a correspondence between aims and achievements, the understanding of both aspects is highly dependent on the project process. An example of a successful project that did not meet the original performance...... targets will serve to show that success is at matter of perspective as much as it is a matter of achievement. Other types of research, e.g. social psychology, have addressed the issue of success more explicitly. I draw on such literature to conceptualize project success anew and to reestablish...

  19. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...... many of the key performance indicators associated with them can be evaluated (Grundfos and Siemens Wind Power). In addition to the current status of delivering impact faster for the seven pilot projects, it is important to highlight that Project Half Double phase 1 has planted many seeds in the pilot......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...

  20. ALS Project Management Manual

    Energy Technology Data Exchange (ETDEWEB)

    Krupnick, Jim; Harkins, Joe

    2000-05-01

    This manual has been prepared to help establish a consistent baseline of management practices across all ALS projects. It describes the initial process of planning a project, with a specific focus on the production of a formal project plan. We feel that the primary weakness in ALS project management efforts to date stems from a failure to appreciate the importance of ''up-front'' project planning. In this document, we present a guide (with examples) to preparing the documents necessary to properly plan, monitor, and control a project's activities. While following the manual will certainly not guarantee good project management, failure to address the issues we raise will dramatically reduce the chance of success. Here we define success as meeting the technical goals on schedule and within the prescribed budget.

  1. Visualizations as Projection Devices

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    schedule for the hospital construction project. The study reveals how the visualizations are dynamically developed and linked to each other and their role in facilitating both control and innovation in project work and clinical work at the hospital. The paper contributes to our understanding of the active......The aim of this paper is to inquire into the role of project visualizations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organization. During the on-boarding visualizations multiplies in form, content and purpose, ranging from paper and digitally based projections of clinical work spaces and practices for the future hospital building in use, to paper and digitally based projections of the cost budget and time...

  2. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  3. Project Surveillance and Maintenance Plan. [UMTRA Project

    Energy Technology Data Exchange (ETDEWEB)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

  4. River Protection Project (RPP) Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  5. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  6. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  7. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Gerstrøm, Anna; Frederiksen, Signe Hedeboe

    projects and to document their development. The purpose of this addendum is thus to document the development in the pilot projects from June 2016 to January 2017 with particular focus on the impact they have created. This Addendum is a supplement and should be read in conjunction with the Phase 1 report...... by the day. The formal part of Project Half Double was initiated in June 2015; it is divided into two phases where phase 1 took place from June 2015 to June 2016 with seven pilot projects, and phase 2 is in progress from July 2016 to July 2017 with 10 pilot projects. The Half Double consortium: Implement....... The Danish Industry Foundation, an independent philanthropic foundation, is contributing to the project financially with DKK 13.8 million. About the addendum: We published the report “Preliminary results for phase 1” in June 2016 (Svejvig, Ehlers et al. 2016). It is time to follow up on the Phase 1 pilot...

  8. Battleground Energy Recovery Project

    Energy Technology Data Exchange (ETDEWEB)

    Bullock, Daniel [USDOE Gulf Coast Clean Energy Application Center, Woodlands, TX (United States)

    2011-12-31

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and Create a Showcase Waste Heat Recovery Demonstration Project.

  9. Orion Project Status Report

    Science.gov (United States)

    Stiewing, Albert; Hopkins, Jeffrey L.

    2015-05-01

    Originally started in 2012 as the Betelgeuse Project, interest in the other bright stars of Orion soon expanded the Project stars to include a total of six of the brightest stars in Orion. The name was then changed to the Orion Project. Orion is one of the most famous constellations. Its declination along the celestial equator is such that it is visible from most of northern and southern hemispheres. In addition, the stars of Orion are very bright and interesting. The Orion Project now includes the stars Betelgeuse, Rigel, Saiph and the three stars of Orion's belt, Mintaka, Alnilam and Alnitak. The projects objectives are both to help the observer produce quality photometric and spectroscopic data and to produce archival quality photometric (BVRIJH bands) and spectroscopy (low, mid and high-resolution) data. This paper is a summary of the Orion Project status.

  10. Computer Assets Recovery Project

    Science.gov (United States)

    CortesPena, Aida Yoguely

    2010-01-01

    This document reports on the project that was performed during the internship of the author. The project involved locating and recovering machines in various locations that Boeing has no need for, and therefore requires that they be transferred to another user or transferred to a non-profit organization. Other projects that the author performed was an inventory of toner and printers, loading new computers and connecting them to the network.

  11. Operational Waste Volume Projection

    Energy Technology Data Exchange (ETDEWEB)

    STRODE, J.N.

    1999-08-24

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  12. Organization of project management

    International Nuclear Information System (INIS)

    Schmidt, R.

    1975-01-01

    When speaking about interfaces within a project and their management, one has to understand and define what an interface is. In general, each component facing another one and each person working on a project with another person represents an interface. Therefore a project will consist practically in its entirety of interfaces with components and people sandwiched between them. This paper is limited to the most important interfaces with a focus on the problems occuring at them and their resolution. (orig.) [de

  13. PPP projects in transport

    DEFF Research Database (Denmark)

    Petersen, Ole Helby; Carpintero, Samuel

    2014-01-01

    Public–private partnerships (PPPs) have been extensively used in Spain for the procurement of light rail systems. This paper analyses five projects that have been in operation for more than five years. The authors examine the reasoning behind the selection of the PPP projects, risk......-sharing mechanisms, competition among private providers, and overall cost-effectiveness. The paper demonstrates a need for more rigorous assessments of the merits of PPP projects before they are initiated....

  14. Methodical ICT Project Management

    OpenAIRE

    Anna Kaczorowska; Sabina Motyka; Jolanta Słoniec

    2016-01-01

    The main aim of this publication is to provide the practitioners and theoreticians of project management with an indispensable insight into the offer of the best methods of ICT projects and their best adjustment to the organization's actual needs. The morphological analysis was used to construct the tool for evaluation of the needs and level of support offered by the ICT project management methods. The use of morphological matrix as a research tool allowed to carry out a comprehensive analysi...

  15. Operational Waste Volume Projection

    Energy Technology Data Exchange (ETDEWEB)

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  16. Project Identification and Formulation

    DEFF Research Database (Denmark)

    Lund, Søren; Lønholdt, Jens

    2005-01-01

    Provides the necessary conceptual framework and tools to assess all appropriate aspects of water and sanitation projects in developing countries. Appeals to graduate environmental engineering students, practitioners, economists, sociologists, and institutional planners working with water and sani......Provides the necessary conceptual framework and tools to assess all appropriate aspects of water and sanitation projects in developing countries. Appeals to graduate environmental engineering students, practitioners, economists, sociologists, and institutional planners working with water...... and sanitation projects in developing countries....

  17. Submarine Combat Systems Engineering Project Capstone Project

    Science.gov (United States)

    2011-06-06

    to 06-06-2011 4. TITLE AND SUBTITLE Submarine Combat Systems Engineering Project 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ...AND ALLOCATIONS ..............................................25 E. APPLYING FITTS ’ LIST...25 Figure 8 Fitts ’ List [Schmidt, 2010

  18. Embedded Linux projects using Yocto project cookbook

    CERN Document Server

    González, Alex

    2015-01-01

    If you are an embedded developer learning about embedded Linux with some experience with the Yocto project, this book is the ideal way to become proficient and broaden your knowledge with examples that are immediately applicable to your embedded developments. Experienced embedded Yocto developers will find new insight into working methodologies and ARM specific development competence.

  19. River Protection Project (RPP) Project Management Plan

    International Nuclear Information System (INIS)

    NAVARRO, J.E.

    2001-01-01

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation

  20. The Wedding Project: Introducing the Project Approach

    Science.gov (United States)

    Sorrels, Barbara; Norris, Deborah; Sheeran, Linda

    2004-01-01

    Constructivist education, based on the theories of Piaget and Vygotsky, advocates an approach to curriculum and teaching that is student centered, inquiry based, integrated and intellectually engaging. One teaching strategy that provides such an experience is the Project Approach, reflective of the pedagogy of John Dewey and introduced as a model…

  1. The Global Supernova Project

    Science.gov (United States)

    Howell, Dale Andrew; Global Supernova Project

    2017-06-01

    The Global Supernova Project is worldwide collaboration to study 600 supernovae of all types between May 2017 and July 2020. It is a Key Project at Las Cumbres Observatory, whose global robotic telescope network will provide lightcurves and spectra. Follow-up observations will be obtained on many other facilities, including Swift, VLA, K2, the NTT, IRTF, Keck, and Gemini. Observations are managed by the Supernova Exchange, a combination observatin database and telescope control system run by LCO. Here we report on results from the previous Supernova Key Project, and first results from the Global Supernova Project.

  2. Composites for Exploration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The project will devise test and development approaches to support development of large scale composite payload fairing structures, including conducting tests and...

  3. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management of distr......Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  4. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  5. Aerospace Systems Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Proposal Title: Aerospace Systems Monitor PHASE 1 Technical Abstract: This Phase II STTR project will continue development and commercialization of the Aerospace...

  6. Assessment of Students Projects

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; Stachowicz, Marian S.

    2012-01-01

    The evaluation and assessment of engineering programmes is a big issue, and there exist many concepts and methods. This paper deals with the assessment methods which can be used when assessing the knowledge, skills and competences developed in projects using PBL (problem based and project organized...... learning) pedagogical approaches. The experience of assessing first year projects from the Medialogy education at Aalborg University and third year projects from the Electrical and Computer Engineering Department at University of Minnesota, Duluth are presented, and the different methods discussed...

  7. Hovdabrekka Project II

    DEFF Research Database (Denmark)

    Hovden, Jan

    2008-01-01

    The Hovdabrekka group is a group of nordic researchers doing survey studies of Nordic journalism schools (2005,2008). This site is dedicated to information from this project. The current members are: Norway: Rune Ottosen,Gunn Bjørnsen and Jan Fredrik Hovden Sweden: Jenny Wiik Denmark: Ida Willig...... and Jannie Møller Hartley. Finland: Henrika Zilliacus-Tikkanen and Raimo Solokangas Former members: Jan Dyberg and Hanne Jørndrup (Denmark), Marina Ghersetti (Sweden) Project Hovdabrekka originated at the Nordic conference for journalist teachers at Hovdabrekka, Iceland September 2004, where a small group...... this project, contact Jan Fredrik Hovden, who is the current leader of the project....

  8. FLEXI Project Management Survey

    Science.gov (United States)

    Rohunen, Anna; Krzanik, Lech; Kuvaja, Pasi; Similä, Jouni; Rodriguez, Pilar; Hyysalo, Jarkko; Linna, Tommi

    FLEXI Project Management Survey (FLEXI PMS) has been established to gain detailed knowledge on how the software industry - in particular successful companies - manages agile software development. FLEXI PMS investigates the actual agile values, principles, practices and contexts. The survey is supported by a careful literature review and analysis of existing studies. Special attention is attached to large, multi-site, multi-company and distributed projects - the target area of FLEXI project. The survey is intended to provide solid data for further knowledge acquisition and project/company positioning with regard to feasible agile management practices.

  9. Hybrid Nanocomposite Photovoltaics Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovation Research Phase I project will develop an innovative solar cell design that combines nanotechnology with conducting polymer...

  10. Photovoltaic Wire Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovation Research Phase I project will investigate a new architecture for photovoltaic devices based on nanotechnology: photovoltaic wire. The...

  11. HERMES project management I

    CERN Multimedia

    CERN. Geneva

    2013-01-01

    A two-hours course on the HERMES Project Management Methodology to the attention of Project Leaders and Project Participants. The methodology is quickly presented; the focus is put on the roles and responsibilities and on the project initiation phase. The course is given in French with slides in English. On April 22nd 2013, a new version of the HERMES methodology was made public. For practical reasons, this course is still given based on the 2009 version of HERMES (a.k.a. HERMES 4).

  12. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  13. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  14. The Plate Tectonics Project

    Science.gov (United States)

    Hein, Annamae J.

    2011-01-01

    The Plate Tectonics Project is a multiday, inquiry-based unit that facilitates students as self-motivated learners. Reliable Web sites are offered to assist with lessons, and a summative rubric is used to facilitate the holistic nature of the project. After each topic (parts of the Earth, continental drift, etc.) is covered, the students will…

  15. Climate projections FAQ

    Science.gov (United States)

    A.E. Daniels; J.F. Morrison; L.A. Joyce; N.L. Crookston; S.C. Chen; S.G. McNulty

    2012-01-01

    Climate scenarios offer one way to identify and examine the land management challenges posed by climate change. Selecting projections, however, requires careful consideration of the natural resources under study, and where and how they are sensitive to climate. Selection also depends on the robustness of different projections for the resources and geographic area of...

  16. The Comic Book Project

    Science.gov (United States)

    Bitz, Michael

    2008-01-01

    The Comic Book Project (CBP) celebrates its eighth anniversary this year. The project, which just originated with one school in New York City, had grown to encompass thousands of students nationwide. The goal of the CBP is not to create comics the "Marvel way" or to develop the next Stan Lee. Rather, the goal is to give students the opportunity to…

  17. Classifying IS Project Problems

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2006-01-01

    The literature contains many lists of IS project problems, often in the form of risk factors. The problems sometimes appear unordered and overlapping, which reduces their usefulness to practitioners as well as theoreticians. This paper proposes a list of criteria for formulating project problems...

  18. Project Quality Plan

    DEFF Research Database (Denmark)

    Sandborg-Petersen, Ulrik; Øhrstrøm, Peter

    This document defines the procedures, standards, and strategies which will be used to ensure high standards of quality of the work produced within the HANDS project. It contains the following sections......This document defines the procedures, standards, and strategies which will be used to ensure high standards of quality of the work produced within the HANDS project. It contains the following sections...

  19. Award Winning Science Projects.

    Science.gov (United States)

    Showalter, Victor M.; Slesnick, Irwin L.

    This is a collection of reports of student award winning science projects that have appeared in "The Science Teacher." Grade levels 7-12 are represented with projects categorized as follows: biology, chemistry and physics, earth-space science, and miscellaneous. In each section the abstracts are arranged in order of increasing complexity…

  20. Financing landfill gas projects

    International Nuclear Information System (INIS)

    Bull, R.

    1992-01-01

    The problems of financing landfill gas projects in the UK in the last few years are discussed. The approach of the author in setting up a company to finance such projects in the power generation field and a separate company to design and supply turnkey packages is reported. (UK)

  1. SAMBA Project Experiences

    Science.gov (United States)

    Fuhrhop, Christian; Vaidya, Raju; Mayora, Oscar; Furtado, Elizabeth

    The purpose of the SAMBA project, running from January 2007 to February 2009, was to create a framework for allowing local communities and citizens (including low income population) to access community-oriented content and services by means of iDTV channels, specifically MHP over DVB-T. This paper summarises the project and the experiences gained from it.

  2. Educational Project with MIND.

    Science.gov (United States)

    Ruddock, Helen; Worrall, Paul

    A project in creative writing and literacy was developed and implemented for people experiencing mental health difficulties. The project was a jointly organized activity between Dearne Valley College and Doncaster MIND in England. (MIND is a network of mental health associations in England and Wales.) The college counselor acted as the supervisor…

  3. Family Reunification Project.

    Science.gov (United States)

    Administration for Children, Youth, and Families (DHHS), Washington, DC.

    Utah's Department of Human Services' Family Reunification Project was initiated to demonstrate that intensive, time-limited, home-based services would enable children in foster care to return to their natural families more rapidly than regular foster care management permits. The following steps were taken in project development: (1) sites were…

  4. BI Project Success

    Science.gov (United States)

    Tracey, Graham; Riha, James

    2009-01-01

    Managing business intelligence (BI) projects in higher education is a formidable responsibility that challenges even the most experienced technical project managers. Data source dependencies, uncertain data quality, changing information requirements, and urgency for actionable information are but a few examples among the multitude of challenges.…

  5. The Roskilde Project

    DEFF Research Database (Denmark)

    Bastrup-Birk, A.; Clark, D. R.

    This report is a result of one of the Danish support projects for the European Environmental Agency during the period 1995-1996.......This report is a result of one of the Danish support projects for the European Environmental Agency during the period 1995-1996....

  6. Oak Tree Planting Project

    Science.gov (United States)

    Sherryl L. Nives; William D. Tietje; William H. Weitkamp

    1991-01-01

    An Oak Tree Planting Project was conducted during 1989/90 in San Luis Obispo County by the Integrated Hardwood Range Management Program (IHRMP)/Central Coast. The local media and an IHRMP workshop were used to publicize the Planting Project and give information on the status of oaks (Quercus spp.) in California and oak planting techniques. Outreach...

  7. Plant Biology Science Projects.

    Science.gov (United States)

    Hershey, David R.

    This book contains science projects about seed plants that deal with plant physiology, plant ecology, and plant agriculture. Each of the projects includes a step-by-step experiment followed by suggestions for further investigations. Chapters include: (1) "Bean Seed Imbibition"; (2) "Germination Percentages of Different Types of Seeds"; (3)…

  8. Managing Stress. Project Seed.

    Science.gov (United States)

    Muto, Donna; Wilk, Jan

    One of eight papers from Project Seed, this paper describes a stress management project undertaken with high school sophomores. Managing Stress is described as an interactive workshop that offers young people an opportunity to examine specific areas of stress in their lives and to learn effective ways to deal with them. The program described…

  9. The Gismo project

    International Nuclear Information System (INIS)

    Breakstone, A.

    1993-01-01

    We describe Gismo, which is a software project to use object-oriented programming techniques to simulate detectors and reconstruct events. Gismo consists of a kernel, written in C ++ , with extensions to do detector and event input and output, graphics, and the use of a graphical user interface. We give the current status of the project and future plans. (author)

  10. Project Systematics of Annonaceae

    NARCIS (Netherlands)

    Maas, P.J.M.

    1983-01-01

    Recently a multidisciplinary investigation program on the systematics of Annonaceae was started at Utrecht with special emphasis on the Neotropics. This project will be carried out largely within the framework of the UNESCO-project Flora Neotronica. The first goal is to provide a modern

  11. Information Projections Revisited

    Czech Academy of Sciences Publication Activity Database

    Csiszár, I.; Matúš, František

    2003-01-01

    Roč. 49, č. 6 (2003), s. 1474-1490 ISSN 0018-9448 R&D Projects: GA AV ČR IAA1075104 Institutional research plan: CEZ:AV0Z1075907 Keywords : Kullback-Leibler divergence * exponential family * I-projection Subject RIV: BD - Theory of Information Impact factor: 2.245, year: 2003

  12. Sustainable Energy (SUSEN) project

    International Nuclear Information System (INIS)

    Richter, Jiri

    2012-01-01

    Research Centre Rez and University of West Bohemia started preparatory work on the 'Sustainable Energy' project, financed from EU structural funds. The goals and expected results of the project, its organization, estimated costs, time schedule and current status are described. (orig.)

  13. The ANTARES project

    Energy Technology Data Exchange (ETDEWEB)

    Amram, Ph.; Anvar, S.; Aslanides, E.; Aubert, J.J.; Azoulay, R.; Basa, S.; Benhammou, Y.; Bernard, F.; Berthier, R.; Bertin, V.; Billault, M.; Biller, S.; Blanc, F.; Blanc, P.E.; Bland, R.W.; Blondeau, F.; Botton, N. de; Bottu, N.; Boulesteix, J.; Brooks, B.; Brunner, J.; Calzas, A.; Carloganu, C.; Carr, J.; Carton, P.H.; Cartwright, S.; Cases, R.; Cassol, F.; Charles, F.; Charles, J.; Desages, F.; Destelle, J.J.; Dispau, G.; Duval, P.Y.; Engelen, J.; Feinstein, F.; Flores, E.C.; Fopma, J.; Fuda, J.L.; Goret, P.; Gosset, L.; Gournay, J.F.; Hernandez, J.J.; Hubaut, F.; Hubbard, R.; Huss, D.; Jaquet, M.; Jelley, N.; Kajfasz, E.; Kouchner, A.; Kudryavtsev, V.; Lachartre, D.; Lafoux, H.; Lamare, P.; Languillat, J.C.; Laugier, J.P.; Le Provost, H.; Loiseau, D.; Loucatos, S.; Magnier, P.; Marc, K.; Marcelin, M.; Martin, L.; Mazeau, B.; Mazure, A.; McMillan, J.; Meessen, C.; Millot, C.; Mols, P.; Montanet, F.; Moorhead, M.; Moscoso, L.; Navas, S.; Nooren, Van; Olivetto, C.; Palanque-Delabrouille, N.; Pallares, A.; Payre, P.; Perrin, P.; Poinsignon, J.; Potheau, R.; Qian, Z.; Raymond, M.; Roberts, J.; Sacquin, Y.; Schuller, J.P; Schuster, W.; Spooner, N.; Stolarczyk, T.; Tabary, A.; Talby, M; Tao, C.; Thompson, L.; Triay, R.; Valdy, M.; Velasco, J.; Vigeolas, E.; Vignaud, D.; Vilanova, D.; Wark, D.; Zuniga, J

    1999-03-01

    The ANTARES project is an international collaboration with the aim of building a deep-sea large area neutrino telescope within the next decade. The achievements and status of the project as at the time of the conference are briefly discussed, and short term steps as well as longer term plans are described.

  14. Financing nuclear power projects

    International Nuclear Information System (INIS)

    Frost, N.C.

    1989-01-01

    The purpose of this paper is: (1) To provide an historical framework for understanding why it is difficult to finance nuclear power projects in the U.S.; (2) To mention briefly certain financing techniques utilized by companies to finance nuclear investments; and (3) To set forth the requirements investors will need before taking on the risks associated with nuclear power projects

  15. The TULIP Project.

    Science.gov (United States)

    Gusack, Nancy, Ed.; And Others

    1995-01-01

    Contains 11 articles that describe different university access systems designed and built to provide access to journals via The University Licensing Program (TULIP), a science journal access project, involving Elsevier Science Publishing and major universities. The project produced insights to help with future electronic information delivery…

  16. The Okapi Projects.

    Science.gov (United States)

    Keen, Michael

    1997-01-01

    Examines general issues in conducting information retrieval research. Topics include the Okapi information retrieval system and its probabilistic model; the Cranfield projects, concerning recall and precision; the SMART project with its vector-space model; evaluation methodology, including laboratory evaluation of interactive systems; and…

  17. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  18. Solar renovation demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Bruun Joergensen, O. [ed.

    1998-10-01

    In the framework of the IEA SHC Programme, a Task on building renovation was initiated, `Task 20, Solar Energy in Building Renovation`. In a part of the task, Subtask C `Design of Solar Renovation Projects`, different solar renovation demonstration projects were developed. The objective of Subtask C was to demonstrate the application of advanced solar renovation concepts on real buildings. This report documents 16 different solar renovation demonstration projects including the design processes of the projects. The projects include the renovation of houses, schools, laboratories, and factories. Several solar techniques were used: building integrated solar collectors, glazed balconies, ventilated solar walls, transparent insulation, second skin facades, daylight elements and photovoltaic systems. These techniques are used in several simple as well as more complex system designs. (au)

  19. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  20. Project management for engineers

    CERN Document Server

    Bennett, Michael J

    2014-01-01

    Project Management for Engineers, as the title suggests, is a direct attempt at addressing the ever-increasing and specific needs for better project management of engineering students, practicing engineers and managers in the industry. It aims not only to present the principles and techniques of Project Management, but also to discuss project management standards, processes and requirements, such as PMBOK, IEEE and PRINCE. Each chapter begins with the basics of the theme being developed at a level understandable to an undergraduate, before more complex topics are introduced at the end of each section that are suitable for graduate students. For the practicing professionals or managers in the industry, the book also provides many real illustrations of practical application of the principles of Project Management. Through a realistic blend of theory and practical examples, as well as an integration of the engineering technical issues with business issues, this book seeks to remove the veil of mystery that has...

  1. Bioenergy/Biotechnology projects

    Energy Technology Data Exchange (ETDEWEB)

    Napper, Stan [Louisiana Tech Univ., Ruston, LA (United States); Palmer, James [Louisiana Tech Univ., Ruston, LA (United States); Wilson, Chester [Louisiana Tech Univ., Ruston, LA (United States); Guilbeau, Eric [Louisiana Tech Univ., Ruston, LA (United States); Allouche, Erez [Louisiana Tech Univ., Ruston, LA (United States)

    2012-06-30

    This report describes the progress of five different projects. The first is an enzyme immobilization study of cellulase to reduce costs of the cellulosic ethanol process. High reusability and use of substrates applicable to large scale production were focus areas for this study. The second project was the development of nanostructured catalysts for conversion of syngas to diesel. Cobalt nanowire catalyst was used in Fischer-Tropsch synthesis. The third project describes work on developing a microfluidic calorimeter to measure reaction rates of enzymes. The fourth project uses inorganic polymer binders that have the advantage of a lower carbon footprint than Portland cement while also providing excellent performance in elevated temperature, high corrosion resistance, high compressive and tensile strengths, and rapid strength gains. The fifth project investigates the potential of turbines in drop structures (such as sewer lines in tall buildings) to recover energy.

  2. projecting pARTicles, a STEAM project

    CERN Document Server

    Goldfarb, Steven; The ATLAS collaboration

    2016-01-01

    Agnes Chavez is a media artist based in the US (New Mexico) and involved in STEM Art Labs. An informal partnership initiated with some ATLAS physicists will develop further in 2016 through a series of workshops where Virtual Visits, Master Class material and the presence of a physicist will be gradually integrated. The project can be seen as an illustration of constructive and long term collaboration between artists, students and scientists.

  3. Basalt Waste Isolation Project Reclamation Support Project:

    Energy Technology Data Exchange (ETDEWEB)

    Brandt, C.A.; Rickard, W.H. Jr.; Cadoret, N.A.

    1992-06-01

    The Basalt Waste Isolation Project (BWIP) Reclamation Support Project began in the spring of 1988 by categorizing sites distributed during operations of the BWIP into those requiring revegetation and those to be abandoned or transferred to other programs. The Pacific Northwest Laboratory's role in this project was to develop plans for reestablishing native vegetation on the first category of sites, to monitor the implementation of these plans, to evaluate the effectiveness of these efforts, and to identify remediation methods where necessary. The Reclamation Support Project focused on three major areas: geologic hydrologic boreholes, the Exploratory Shaft Facility (ESF), and the Near-Surface Test Facility (NSTF). A number of BWIP reclamation sites seeded between 1989 and 1990 were found to be far below reclamation objectives. These sites were remediated in 1991 using various seedbed treatments designed to rectify problems with water-holding capacity, herbicide activity, surficial crust formation, and nutrient imbalances. Remediation was conducted during November and early December 1991. Sites were examined on a monthly basis thereafter to evaluate plant growth responses to these treatments. At all remediation sites early plant growth responses to these treatments. At all remediation sites, early plant growth far exceeded any previously obtained using other methods and seedbed treatments. Seeded plants did best where amendments consisted of soil-plus-compost or fertilizer-only. Vegetation growth on Gable Mountain was less than that found on other areas nearby, but this difference is attributed primarily to the site's altitude and north-facing orientation.

  4. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  5. Improving Project Manufacturing Coordination

    Directory of Open Access Journals (Sweden)

    Korpivaara Ville

    2014-09-01

    Full Text Available The objective of this research is to develop firms’ project manufacturing coordination. The development will be made by centralizing the manufacturing information flows in one system. To be able to centralize information, a deep user need assessment is required. After user needs have been identified, the existing system will be developed to match these needs. The theoretical background is achieved through exploring the literature of project manufacturing, development project success factors and different frameworks and tools for development project execution. The focus of this research is rather in customer need assessment than in system’s technical expertise. To ensure the deep understanding of customer needs this study is executed by action research method. As a result of this research the information system for project manufacturing coordination was developed to respond revealed needs of the stakeholders. The new system improves the quality of the manufacturing information, eliminates waste in manufacturing coordination processes and offers a better visibility to the project manufacturing. Hence it provides a solid base for the further development of project manufacturing.

  6. Projected coupled cluster theory.

    Science.gov (United States)

    Qiu, Yiheng; Henderson, Thomas M; Zhao, Jinmo; Scuseria, Gustavo E

    2017-08-14

    Coupled cluster theory is the method of choice for weakly correlated systems. But in the strongly correlated regime, it faces a symmetry dilemma, where it either completely fails to describe the system or has to artificially break certain symmetries. On the other hand, projected Hartree-Fock theory captures the essential physics of many kinds of strong correlations via symmetry breaking and restoration. In this work, we combine and try to retain the merits of these two methods by applying symmetry projection to broken symmetry coupled cluster wave functions. The non-orthogonal nature of states resulting from the application of symmetry projection operators furnishes particle-hole excitations to all orders, thus creating an obstacle for the exact evaluation of overlaps. Here we provide a solution via a disentanglement framework theory that can be approximated rigorously and systematically. Results of projected coupled cluster theory are presented for molecules and the Hubbard model, showing that spin projection significantly improves unrestricted coupled cluster theory while restoring good quantum numbers. The energy of projected coupled cluster theory reduces to the unprojected one in the thermodynamic limit, albeit at a much slower rate than projected Hartree-Fock.

  7. RCA's regional industrial project

    International Nuclear Information System (INIS)

    Ali, A.T.

    1988-01-01

    The Regional Cooperation Agreement (RCA) for Research Development and Training Related to Nuclear Science and Technology, formulated under the auspices of the International Atomic Energy Agency (IAEA), came into force in June 1972. The overall objective of RCA is to promote technical cooperation among the developing and developed countries in the Asia Pacific region in the peaceful uses of nuclear energy and related technology. Currently, the biggest project under RCA is the Regional Project on the Industrial Applications of Isotopes and Radiation Technology for Asia and the Pacific. The project was established in 1982 for a period of five years and was completed in December 1986. The first phase of the project has generated a high degree of awareness on the industrial potential of isotopes and radiation technology throughout the region; produced a cadre of trained manpower in all areas covered by the project; identified the expertise available in the region; and developed in the region, a unique network of people and institutions involved with the utilization of isotope and radiation technology. A Phase II of the project, which cover all but one of the sub-projects under Phase I, was approved in early 1987 for another five years until 1991. (Nogami, K.)

  8. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  9. Relationships and project marketing success

    DEFF Research Database (Denmark)

    Skaates, Maria Anne; Tikkanen, Henrikki; Lindblom, Jarno

    2002-01-01

    Project operations are a dominating mode of international business. Managing relationships and networks is crucial to project marketing success both at the level of the individual project and at the level of multiple projects. This article first defines key characteristics of project business......, identifies potentially relevant actors in the project marketing milieu, and emphasizes the importance of constantly nurturing project business relationships, also in "sleeping relationship" periods where concrete projects are not expected. Thereafter the points made are illustrated with a Finnish......-Chinese turnkey project case at the level of the individual project and a Danish-German professional service project case at the level of multiple projects. It is concluded that project managers and marketers should focus their attention on the management of project relationships before, during, and after...

  10. Status of APE projects

    CERN Document Server

    Alfieri, R; Onofri, E; Bartoloni, A; Battista, C; Cabibbo, Nicola; Cosimi, M; Lonardo, A; Michelotti, A; Proietti, B; Rapuano, F; Rossetti, D; Sacco, G; Tassa, S; Torelli, M; Vicini, P; Pène, O; Errico, W; Magazzù, G; Sartori, L; Schiiano, F; Tripiccione, R; De Riso, P; Petronzio, Roberto; Destri, C; Frezzotti, R; Marchesini, G; Gensch, Ulrich; Jansen, K; Kretzschmann, A; Leich, H; Paschedag, N; Pleiter, D; Schwendicke, U; Simma, H; Sommer, Rainer; Sulanke, K; Wegner, P; Fucci, A; Martin, B; Pech, J; Panizzi, E; Petricola, A

    2001-01-01

    This talk is divided in two parts. In the first part, we will summarize the status of the APEmille project that will be completed by the end of the year. We will then devote the rest of the talk to the description of a new project for a multi-TeraFlop machine, ape NEXT. The interested reader will find a much more detailed discussion of all the items touched upon here in the full proposal of the project that will shortly appear on hep-lat. (9 refs).

  11. Making energy projects happen

    International Nuclear Information System (INIS)

    Gilliland, S.F.; Utt, W.P.; Neff, N.T.

    1988-01-01

    In today's business environment, control of energy cost is a major challenge for businesses, institutions, and governmental agencies. New technologies are available to reduce energy costs through cogeneration, cheaper fuels, or other means. Often it is not possible for a Plant Owner to undertake such a project, regardless of how desirable it may be. The authors of this paper show that by applying the principles of Project Structuring and developing a comprehensive project team, the desired reduction in energy costs can be achieved. Various examples are cited, and guidelines are given for an Owner to use

  12. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    contributes to the understanding of the distinctive characteristics of such a new medium, and identifies three strategies for designing 3-D projection installations: establishing space; interplay between the digital and the physical; and transformation of materiality. The principal empirical case, From......Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article...

  13. Projection Models 2010

    DEFF Research Database (Denmark)

    Illerup, J. B.; Birr-Pedersen, K.; Mikkelsen, M. H

    Models for projection of SO2-, NOx-, NMVOC- and NH3-emissions to the atmosphere have been developed and the Danish emissions have been projected until 2010 from a basis scenario including all implemented and planned measures. The projections of the four pollutants indicate that it may be difficult...... to achieve the emission ceilings given in the Gothenburg Protocol and the EU directive on national emission ceilings in 2010. In addition to the basis scenario, 8 emission reduction scenarios for different sectors have been analysed in order to estimate the emission saving potential and financial and welfare...

  14. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Terry W. Battiest

    2008-06-11

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  15. The CORMAN project

    DEFF Research Database (Denmark)

    Bregnballe, Thomas

    2013-01-01

    Platform in order to disseminate information. The project has also engaged with key European stakeholder groups and formed a Stakeholders Liaison Group to support information exchange and discuss relevant issues. The project is carried out on behalf of DG Environment under the European Commission.......The CORMAN project (‘Sustainable Management of Cormorant Populations’) is now in its final year. The main goals have been (1) to collaborate with the CRG in order to assess the number and distribution of Cormorants in Europe during breeding and wintertime, and (2) to create the EU Cormorant...

  16. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    in a distributed fashion over the Internet needs more attention to the interaction protocol since the physical group room is not existing. The purpose in this paper is to develop a method for online project work by using the product: Basic Support for Cooperative Work (BSCV). An analysis of a well-proven protocol...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic....

  17. Prometheus Project final report

    Science.gov (United States)

    Taylor, Randall

    2005-01-01

    This Final Report serves as an executive summary of the Prometheus Project's activities and deliverables from November 2002 through September 2005. It focuses on the challenges from a technical and management perspective, what was different and innovative about this project, and identifies the major options, decisions, and accomplishments of the Project team as a whole. However, the details of the activities performed by DOE NR and its contractors will be documented separately in accordance with closeout requirements of the DOE NR and consistent with agreements between NASA and NR.

  18. Arduino projects for dummies

    CERN Document Server

    Craft, Brock

    2013-01-01

    Discover all the amazing things you can do with Arduino Arduino is a programmable circuit board that is being used by everyone from scientists, programmers, and hardware hackers to artists, designers, hobbyists, and engineers in order to add interactivity to objects and projects and experiment with programming and electronics. This easy-to-understand book is an ideal place to start if you are interested in learning more about Arduino's vast capabilities. Featuring an array of cool projects, this Arduino beginner guide walks you through every step of each of the featured projects so

  19. IT Project Prioritization Process

    DEFF Research Database (Denmark)

    Shollo, Arisa; Constantiou, Ioanna

    2013-01-01

    In most of the large companies IT project prioritization process is designed based on principles of evidencebased management. We investigate a case of IT project prioritization in a financial institution, and in particular, how managers practice evidence-based management during this process. We use...... a rich dataset built from a longitudinal study of the prioritization process for the IT projects. Our findings indicate that managers reach a decision not only by using evidence but from the interplay between the evidence and the judgment devices that managers employ. The interplay between evidence...

  20. Methodical ICT Project Management

    Directory of Open Access Journals (Sweden)

    Anna Kaczorowska

    2016-07-01

    Full Text Available The main aim of this publication is to provide the practitioners and theoreticians of project management with an indispensable insight into the offer of the best methods of ICT projects and their best adjustment to the organization's actual needs. The morphological analysis was used to construct the tool for evaluation of the needs and level of support offered by the ICT project management methods. The use of morphological matrix as a research tool allowed to carry out a comprehensive analysis of the needs within implementation of particular problem areas.

  1. Introduction to projective geometry

    CERN Document Server

    Wylie, C R

    2008-01-01

    This lucid introductory text offers both an analytic and an axiomatic approach to plane projective geometry. The analytic treatment builds and expands upon students' familiarity with elementary plane analytic geometry and provides a well-motivated approach to projective geometry. Subsequent chapters explore Euclidean and non-Euclidean geometry as specializations of the projective plane, revealing the existence of an infinite number of geometries, each Euclidean in nature but characterized by a different set of distance- and angle-measurement formulas. Outstanding pedagogical features include w

  2. Raspberry Pi projects

    CERN Document Server

    Robinson, Andrew

    2013-01-01

    Learn to build software and hardware projects featuring the Raspberry Pi! Raspberry Pi represents a new generation of computers that encourages the user to play and to learn and this unique book is aimed at the beginner Raspberry Pi user who is eager to get started creating real-world projects. Taking you on a journey of creating 15 practical projects, this fun and informative resource introduces you to the skills you need to have in order to make the most of the Pi. The book begins with a quick look at how to get the Pi up and running and then encourages you to dive into the array of exciti

  3. The Methanol Economy Project

    Energy Technology Data Exchange (ETDEWEB)

    Olah, George [Univ. of Southern California, Los Angeles, CA (United States); Prakash, G. K. [Univ. of Southern California, Los Angeles, CA (United States)

    2014-02-01

    The Methanol Economy Project is based on the concept of replacing fossil fuels with methanol generated either from renewable resources or abundant natural (shale) gas. The full methanol cycle was investigated in this project, from production of methanol through bromination of methane, bireforming of methane to syngas, CO2 capture using supported amines, co-electrolysis of CO2 and water to formate and syngas, decomposition of formate to CO2 and H2, and use of formic acid in a direct formic acid fuel cell. Each of these projects achieved milestones and provided new insights into their respective fields.

  4. Leading global projects for professional and accidental project leaders

    CERN Document Server

    Moran, Robert T

    2008-01-01

    This book is a must-read for anyone responsible for projects and initiatives that span functional and geographical divides. Authors Moran and Youngdahl bring extensive experience and learning from industry practice to present a clear and straightforward treatment of the leadership skills and knowledge required to lead projects that are global in nature. They have written the first book of its kind to address the three essential skills of global project leaders - strategic project management, project leadership, and cross-cultural leadership. The authors argue that global project leadership is an essential skill in our project-based world and that we are all either intentional or accidental project leaders. Intentional project leaders pursue formal project management education and even certification whereas accidental project leaders find themselves leading global projects and initiatives as a result of a special assignment or promotion. Moran and Youndahl have found that the vast majority of global projects ...

  5. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  6. OpenCities Project

    Data.gov (United States)

    US Agency for International Development — The Open Cities Project aims to catalyze the creation, management and use of open data to produce innovative solutions for urban planning and resilience challenges...

  7. EURO HAWK Project Overview

    National Research Council Canada - National Science Library

    2003-01-01

    Briefing charts from presentation on a EURO HAWK project overview; an airborne system with stand-off capability for wide-area intelligence, surveillance and reconnaissance meeting European NATO countries' ISR requirements...

  8. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    in a distributed fashion over the Internet needs more attention to the interaction protocol since the physical group room is not existing. The purpose in this paper is to develop a method for online project work by using the product: Basic Support for Cooperative Work (BSCV). An analysis of a well-proven protocol......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...... for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...

  9. Navajo Electrification Demonstraiton Project

    Energy Technology Data Exchange (ETDEWEB)

    Larry Ahasteen, Project Manager

    2006-07-17

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

  10. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    Despite several attempts to accurately predict duration and cost of software projects, initial plans still do not reflect real-life situations. Since commitments with customers are usually decided based on these initial plans, software companies frequently fail to deliver on time and many projects...... overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...

  11. Visible Human Project

    Science.gov (United States)

    ... Catalog & Services History of Medicine Online Exhibitions & Digital Projects Information for Publishers Visit the Library Research at NLM Human Genome Resources Biomedical Research & Informatics Environmental Health & Toxicology Health Services Research & Public Health ...

  12. Fuel cells: Project Volta

    Energy Technology Data Exchange (ETDEWEB)

    Vellone, R.; Di Mario, F.

    1987-09-01

    This paper discusses research and development in the field of fuel cell power plants. Reference is made to the Italian research Project Volta. Problems related to research program financing and fuel cell power plant marketing are discussed.

  13. Vitamin D Pooling Project

    Science.gov (United States)

    The Vitamin D Pooling Project of Rarer Cancers brought together investigators from 10 cohorts to conduct a large prospective epidemiologic study of the association between vitamin D status and seven rarer cancers.

  14. Infrared Detectors Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The end goal of this project is to develop proof-of-concept infrared detectors which can be integrated in future infrared instruments engaged in remote...

  15. The WPU Project

    DEFF Research Database (Denmark)

    Jensen, Janne Jul; Skov, Mikael B.; Stage, Jan

    2008-01-01

    The Web Portal Usability (WPU) project focuses on usability in the development of modern web portals. Web portals are a key part of software development. They are created to provide a group of users with access to a collection of internet services. State-of-the-art methods for usability engineering...... in the course of the project, when there is neither time nor financial possibilities for solving the problems. The objective of the WPU project is to develop new methods for usability engineering in the development of web portals and to test these methods in companies that develop modern web portals. The result...... is a catalogue of methods that support usability engineering in web portal development, combined with guidelines for use, training programmes and documented experience from deployment and use of the methods. The WPU project is a collaborative effort between researchers from Aalborg University, Department...

  16. RadWorks Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The RadWorks project's overarching objective is the maturation and demonstration of affordable, enabling solutions to the radiation-related challenges presented to...

  17. Health System Measurement Project

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Health System Measurement Project tracks government data on critical U.S. health system indicators. The website presents national trend data as well as detailed...

  18. ALICE Time Projection Chamber

    CERN Multimedia

    Lippmann, C

    2013-01-01

    The Time Projection Chamber (TPC) is the main device in the ALICE 'central barrel' for the tracking and identification (PID) of charged particles. It has to cope with unprecedented densities of charges particles.

  19. Water Recovery Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Water Recovery Project (WRP) is advancing environmental control and life support systems water recovery technologies to support human exploration beyond low...

  20. The SMILING project

    DEFF Research Database (Denmark)

    Berger, Jacques; Blanchard, Gentiane; Ponce, Maiza Campos

    2013-01-01

    The "Sustainable Micronutrient Interventions to Control Deficiencies and Improve Nutritional Status and General Health in Asia" project (SMILING), funded by the European Commission, is a transnational collaboration of research institutions and implementation agencies in five Southeast Asian...

  1. Convergent Aeronautics Solutions Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Convergent Aeronautics Solutions (CAS) Project uses short-duration activities to establish early-stage concept and technology feasibility for high-potential...

  2. The Kintyre uranium project

    International Nuclear Information System (INIS)

    Larson, B.

    1997-01-01

    The Kintyre Uranium Project is being developed by Canning Resources Pty Ltd, a subsidiary of Rio Tinto (formerly CRA). The work on the project includes the planning and management of a number of background environmental studies. The company has also commissioned studies by external consultants into process technologies, mining strategies and techniques for extracting the uranium ore from the waste rock. In addition, Canning Resources has made a detailed assessment of the worldwide market potential for Australian uranium in the late 1990s and into the 21st century. The most significant factor affecting the future of this project is the current product price. This price is insufficient to justify the necessary investment to bring this project into production

  3. Current Resource Imagery Projects

    Data.gov (United States)

    Farm Service Agency, Department of Agriculture — Map showing coverage of current Resource imagery projects. High resolution/large scale Resource imagery is typically acquired for the U.S. Forest Service and other...

  4. Water Properties Sensor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — In this Phase II project, Kaitech proposes to develop and demonstrate a Water Properties Sensor (WPS) sensing system to synchronously measure the spectral inherent...

  5. Circular fringe projection profilometry.

    Science.gov (United States)

    Zhao, Hong; Zhang, Chunwei; Zhou, Changquan; Jiang, Kejian; Fang, Meiqi

    2016-11-01

    In this Letter, a novel three-dimensional (3D) measurement method, called the circular fringe projection profilometry (CFPP), is proposed. Similar to the conventional fringe projection profilometry, CFPP also requires fringe pattern projection and capture, phase demodulation, and phase unwrapping. However, it works with a totally different mechanism. CFPP recovers the height of a point by calculating its distance to the optical center of a projector along the optical axis. This distance is calculated with the aid of the divergence angle of a projected light ray and the distance between the measured point and the optical axis. The distance between the measured point and the optical axis is detected by a camera with telecentric lenses, while the divergence angle can be calculated from the phase of a captured circular fringe pattern. The validity of CFPP is confirmed by a set of experiments.

  6. OECD: Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    The work at the Project has continued in the two main fields: test fuel irradiation and fuel research, and computer based process supervision and control. Organizations participating in the Project continue to have their fuel irradiated in the Halden Reactor in instrumented test assemblies designed and manufactured by the Project. The Project's fuel studies continue to focus on specific subjects such as fuel pellet/cladding interaction and heat transfer, fission product release and fuel behavior under loss of coolant conditions. The work on process control and supervision continues in the highly relevant fields of core control and operator-process communication. A system for predictive core control is being developed while special mathematical methods for core power distribution control are being studied. Operator-process communication studies comprise use of computer simulation on colour display as important ingredients, while the work on developing a system for interactive plant disturbance analysis continues

  7. Autonomous Propellant Loading Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Autonomous Propellant Loading (APL) project consists of three activities. The first is to develop software that will automatically control loading of...

  8. Avionics and Software Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The goal of the AES Avionics and Software (A&S) project is to develop a reference avionics and software architecture that is based on standards and that can be...

  9. Exploration Augmentation Module Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Exploration Augmentation Module (EAM) project goal is to design and deliver a flight module that is to be deployed to Earth-Lunar Distant Retrograde Orbit (DRO)....

  10. Lake Charles CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Leib, Thomas [Leucadia Energy, LLC, Salt Lake City, UT (United States); Cole, Dan [Denbury Onshore, LLC, Plano, TX (United States)

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials

  11. AOS clearwater project update

    Energy Technology Data Exchange (ETDEWEB)

    Palmgren, Claes [Alberta Oilsands Inc (Canada)

    2011-07-01

    The Athabasca oil sands, located in northeastern Alberta, are one of the largest deposits of bitumen in the world. In this presentation Alberta Oilsands Inc. provides an update of their two phase Clearwater project which aims at using an SLP-SAGD system to recover Athabasca bitumen. The Clearwater project site is located nearby the Fort McMurray regional airport. The idea behind the project is to utilize a low pressure SAGD system in combination with a co-injected solvent in order to extract the bitumen. The injected solvent mixes with the bitumen, decreasing its viscosity and improving its ability to flow. This type of system requires only 1000 kPa of operating pressure which leads to a lower steam to oil ratio. By the end of phase one, the Clearwater project aims at bringing in 4,500 barrels of oil per day (BOPD) and 15,000 to 25,000 BOPD by the end of phase two.

  12. Desktop Computing Integration Project

    Science.gov (United States)

    Tureman, Robert L., Jr.

    1992-01-01

    The Desktop Computing Integration Project for the Human Resources Management Division (HRMD) of LaRC was designed to help division personnel use personal computing resources to perform job tasks. The three goals of the project were to involve HRMD personnel in desktop computing, link mainframe data to desktop capabilities, and to estimate training needs for the division. The project resulted in increased usage of personal computers by Awards specialists, an increased awareness of LaRC resources to help perform tasks, and personal computer output that was used in presentation of information to center personnel. In addition, the necessary skills for HRMD personal computer users were identified. The Awards Office was chosen for the project because of the consistency of their data requests and the desire of employees in that area to use the personal computer.

  13. Prioritization of Capital Projects

    National Research Council Canada - National Science Library

    LaVielle, Michael

    2002-01-01

    Public works capital projects in the U,S, naval forces are not prioritized and funded in a way that best uses limited operations resources and maintenance dollars, This thesis develops a linear model...

  14. Principles of project management

    Science.gov (United States)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  15. Journals Data Analysis Project

    OpenAIRE

    Killiard, Patricia

    2018-01-01

    Slides from a lightning talk (5 minute presentation) by Patricia Killiard (Acting Deputy Director, Academic Services, Cambridge University Library). Presented at Cambridge Libraries Conference 2018. The talk discussed the work carried out by the currently running Journals Data Analysis Project.

  16. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  17. DOE Robotics Project

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This document provide the bimonthly progress reports on the Department of Energy (DOE) Robotics Project by the University of Michigan. Reports are provided for the time periods of December 90/January 91 through June 91/July 91. (FI)

  18. The Poisons Project.

    Science.gov (United States)

    Crawford, Barbara A.

    1998-01-01

    Details a project in which students explore and study the poisons in their environment by asking and finding answers to their own research questions. Includes some suggestions for involving students successfully in inquiry-based learning. (DDR)

  19. Projective simulation with generalization

    OpenAIRE

    Melnikov, Alexey A.; Makmal, Adi; Dunjko, Vedran; Briegel, Hans J.

    2017-01-01

    The ability to generalize is an important feature of any intelligent agent. Not only because it may allow the agent to cope with large amounts of data, but also because in some environments, an agent with no generalization capabilities cannot learn. In this work we outline several criteria for generalization, and present a dynamic and autonomous machinery that enables projective simulation agents to meaningfully generalize. Projective simulation, a novel, physical approach to artificial intel...

  20. The WPU Project

    DEFF Research Database (Denmark)

    Jensen, Janne Jul; Skov, Mikael B.; Stage, Jan

    2009-01-01

    The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals.......The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals....

  1. The human genome project

    International Nuclear Information System (INIS)

    Worton, R.

    1996-01-01

    The Human Genome Project is a massive international research project, costing 3 to 5 billion dollars and expected to take 15 years, which will identify the all the genes in the human genome - i.e. the complete sequence of bases in human DNA. The prize will be the ability to identify genes causing or predisposing to disease, and in some cases the development of gene therapy, but this new knowledge will raise important ethical issues

  2. The CINAGE Project

    OpenAIRE

    Granville, J

    2015-01-01

    CINAGE was a Grundtvig multilateral project - interlinked activities resulting in the production of a learning package aimed at empowering older people towards achieving active ageing. Phase one of the CINAGE Project was a structured critical literature review into active ageing and learning, followed by focus groups in partner countries viewing a range of European films, and commenting upon the films’ approaches to the six competencies identified by the European Commission as essential to ac...

  3. The Knowledge Representation Project

    Science.gov (United States)

    1989-07-01

    representing k nowledge. I,- ONE was designed to represent the kinds of knowlodge constriicts encountered by developers of natural language processing systems...project called Empirically Valid Knowledge Representation in 1986. One of the first tasks of the new project was to translate NIKL into Common LISP -- a...constraints -- the syntactic structures that appear in LOO% :constraints or implies clauses translate into knowledge structures for which we have

  4. The SOLEIL project

    International Nuclear Information System (INIS)

    2001-01-01

    The SOLEIL project is built around an optimized 2,5 GeV positron storage ring with its own injector, i-e, a linear accelerator and a booster. This paper gathers information on the main characteristics of the project and more specially on the budget, the staff, the overall time table and a presentation of the Synchrotron Soleil Society. (A.L.B.)

  5. Raspberry Pi robotics projects

    CERN Document Server

    Grimmett, Richard

    2015-01-01

    This book is for enthusiasts who want to use the Raspberry Pi to build complex robotics projects. With the aid of the step-by-step instructions in this book, you can construct complex robotics projects that can move, talk, listen, see, swim, or fly. No previous Raspberry Pi robotics experience is assumed, but even experts will find unexpected and interesting information in this invaluable guide.

  6. The LHC project

    CERN Document Server

    CERN. Geneva

    2002-01-01

    At the halfway point in the construction of the LHC, the project is now moving from the design and procurement phase to the installation phase, which officially started on 1st March. An overview of the progress of the project is given and the final schedule for installation and commissioning is discussed. The talk will be given in English but questions can be taken in French.

  7. LNG project - contractual aspects

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Bruno Almeida

    2008-07-01

    This paper intends to provide from the legal point of view an outline of the main challenges of a LNG project in the upstream, regulatory aspects, liquefaction, financing and midstream through a basic checklist; an overview of the contractual complexity of a LNG project; some basic discussion of particular LNG contract clauses; and a comparative analysis between the classic clauses of a Gas Transportation Agreement (GTA) through a gas pipeline and LNG logistic. (author)

  8. The Esmeralda project

    International Nuclear Information System (INIS)

    Sophy, Y.

    1979-01-01

    This paper discusses the Esmeralda Project for studying extensive fires involving up to 70 metric tons of sodium. The design objectives and major features of the project are presented. The need for sodium fire testing on such a scale, results from problems of similitude arising from the extrapolation of previous results to fires liable to occur in large fast neutron reactors such as Super-Phenix. (author)

  9. The Mississippi CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Doug Cathro

    2010-09-30

    The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

  10. The Bruce nuclear project

    International Nuclear Information System (INIS)

    Rose, J.B.

    1981-01-01

    This case study assesses the industrial relations impact of the construction of the Bruce Nuclear Power Development. It examines the labour relations system in the Ontario electric power sector and in major building construction. Industrial relations problems and practices at the Bruce project are reviewed. The focus of the study is on the relationship between the project and the rest of the Ontario industrial construction industry

  11. Mt. Taylor project

    International Nuclear Information System (INIS)

    Barendsen, R.J.; Heron, J.A.

    1980-01-01

    Gulf Oil Corporation is developing a large and deep mine in the Grants, New Mexico area. Many development challenges have been successfully met and Gulf expects to be in commercial production in 1981 after 7 years of effort. Some basic information about the scope of the project is given and plans for bringing it into production are discussed. The present status of the project is reported

  12. Projective moment invariants

    Czech Academy of Sciences Publication Activity Database

    Suk, Tomáš; Flusser, Jan

    2004-01-01

    Roč. 26, č. 10 (2004), s. 1364-1367 ISSN 0162-8828 R&D Projects: GA ČR GA201/03/0675 Institutional research plan: CEZ:AV0Z1075907 Keywords : projective transform * moment invariants * object recognition Subject RIV: JD - Computer Applications, Robotics Impact factor: 4.352, year: 2004 http://library.utia.cas.cz/prace/20040112.pdf

  13. Managing a sensitive project

    International Nuclear Information System (INIS)

    Etcheber, Pascal

    1998-01-01

    A 'sensitive' project needs to be managed differently from a 'normal' project. This statement might seem simple enough. However, it does not seem to be a simple task to prove it in twenty minutes. This paper is an attempt to share with the audience some of the experiences the company had dealing with sensitive projects. It describes what a sensitive project is, though of all people, the 'nuclear' should know. Then the common mistakes are described, that are made in the hoping that some personal experiences are recognised. Finally the company's strategy is shown, how we foster third party support and the main tools to be used. Ultimately, success is ensured by having a sufficient quantity of allies. A sensitive project does not die because it has too many opponents, but because it has too few allies. Finding and helping allies to act is the thrust of our activity. It enables sensitive projects which deserve to succeed to do so, where traditional management fails miserably

  14. The international hydrocoin project

    International Nuclear Information System (INIS)

    1987-01-01

    The International HYDROCOIN (Hydrologic Code Intercomparison) Project was started in May 1984. Fourteen organizations participate in the Project, with the Swedish Nuclear Power Inspectorate (SKI) as managing participant and the OECD Nuclear Energy Agency (NEA) taking part as a member of the Project secretariat. HYDROCOIN is concerned with the assessment of groundwater movements at potential nuclear waste disposal sites with the help of mathematical models and computer codes. The Project is divided into three levels. The objective of HYDROCOIN Level 1 is to verify the accuracy of groundwater flow codes. HYDROCOIN Level 2 and Level 3 are concerned with validation of hydrological models and uncertainty/sensitivity analysis, respectively. This report, which has been prepared by the NEA Secretariat and SKI in consultation with the co-ordinating group of the HYDROCOIN Project summarizes the background and objectives of the Project and presents the results of the work performed up to the middle of 1987. It is intended to provide general information on HYDROCOIN to interested parties beyond the group of directly involved specialists

  15. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  16. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  17. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  18. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  19. Project Plan Remote Target Fabrication Refurbishment Project

    International Nuclear Information System (INIS)

    Bell, Gary L.; Taylor, Robin D.

    2009-01-01

    was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

  20. SAT project introduction: management issues

    International Nuclear Information System (INIS)

    Kazennov, A.Yu.

    1998-01-01

    Management issues of introducing SAT Project include main objectives and expectations; SAT goal and management; major phases of SAT implementation; project quality assurance; SAT based training system and procedures; role of the project team qualifications

  1. Energy Efficiency Project Development

    Energy Technology Data Exchange (ETDEWEB)

    IUEP

    2004-03-01

    The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1

  2. California Hydrogen Infrastructure Project

    Energy Technology Data Exchange (ETDEWEB)

    Heydorn, Edward C

    2013-03-12

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling

  3. Tucker thermal project

    International Nuclear Information System (INIS)

    2002-09-01

    This document contains details of the Tucker Thermal Project proposed by Husky Energy Inc at their oil sands lease near Tucker Lake in the Cold Lake area of Alberta. Husky Energy Inc is proposing to develop a steam assisted gravity drainage project, complete with multi-well production pads and horizontal wells, with centralized oil treating and produced water recycling facilities. A fuel gas line north to TransCanada Pipelines Limited, an oil sales line and a diluent return line south to Husky's Cold Lake Pipeline Terminal are also part of the project. Current Husky estimates put the recoverable reserves at 150 million barrels of bitumen, which translates to production of 30,000 barrels of synthetic crude per day for 25 years. Baseline environmental and engineering studies have ben recently completed and the Company is continuing with the preparation of an Environmental Impact Assessment, and a project application required by the Alberta Energy and Utilities Board and Alberta Environment for potential thermal project developments. Individual meetings and public consultation with stakeholders are planned to take place during the coming months

  4. RadGenomics project

    International Nuclear Information System (INIS)

    Iwakawa, Mayumi; Imai, Takashi; Harada, Yoshinobu

    2002-01-01

    Human health is determined by a complex interplay of factors, predominantly between genetic susceptibility, environmental conditions and aging. The ultimate aim of the RadGenomics (Radiation Genomics) project is to understand the implications of heterogeneity in responses to ionizing radiation arising from genetic variation between individuals in the human population. The rapid progression of the human genome sequencing and the recent development of new technologies in molecular genetics are providing us with new opportunities to understand the genetic basis of individual differences in susceptibility to natural and/or artificial environmental factors, including radiation exposure. The RadGenomics project will inevitably lead to improved protocols for personalized radiotherapy and reductions in the potential side effects of such treatment. The project will contribute to future research into the molecular mechanisms of radiation sensitivity in humans and will stimulate the development of new high-throughput technologies for a broader application of biological and medical sciences. The staff members are specialists in a variety of fields, including genome science, radiation biology, medical science, molecular biology, and informatics, and have joined the RadGenomics project from various universities, companies, and research institutes. The project started in April 2001. (author)

  5. The ARCHER Project

    International Nuclear Information System (INIS)

    Knol, S.; Roelofs, F.; Fütterer, M.A.; Kohtz, N.; Laurie, M.; Buckthorpe, D.; Scheuermann, W.

    2014-01-01

    The European HTR R&D project ARCHER (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D) builds on a solid HTR technology foundation in Europe, established through former national UK and German HTR programs and in European programs. ARCHER runs from 2011 to 2015 and targets selected HTR R&D subjects that would specifically support demonstration, with a focus on experimental effort. In line with the R&D and deployment strategy of the European Sustainable Nuclear Energy Technology Platform (SNETP) ARCHER contributes to maintaining, strengthening and expanding the HTR knowledge base in Europe to lay the foundations for demonstration of nuclear cogeneration with HTR systems. The project consortium encompasses conventional and nuclear industry, utilities, Technical Support Organizations, R&D organizations and academia. ARCHER shares results with international partners in the Generation IV International Forum and collaborates directly with related projects in the US, China, Japan, the Republic of Korea and South Africa. The ARCHER project is in its final year, and the paper comprises an overview of the achievements thus far for the different Sub Projects. (author)

  6. Instrument validation project

    International Nuclear Information System (INIS)

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells

  7. Three domains of project organising

    OpenAIRE

    Winch, Graham M.

    2014-01-01

    It has become axiomatic in research on project organising that projects are temporary organisations. Yet there are a number of challenges to this axiom: research on matrix organisation, the embeddedness of projects in project ecologies, and projectification all emphasise the relationship of the project to permanent organisations. Similarly, research on project-based firms and owner organisations which are relatively permanent challenges this axiom. This paper develops a conceptual framework w...

  8. Statistical Techniques for Project Control

    CERN Document Server

    Badiru, Adedeji B

    2012-01-01

    A project can be simple or complex. In each case, proven project management processes must be followed. In all cases of project management implementation, control must be exercised in order to assure that project objectives are achieved. Statistical Techniques for Project Control seamlessly integrates qualitative and quantitative tools and techniques for project control. It fills the void that exists in the application of statistical techniques to project control. The book begins by defining the fundamentals of project management then explores how to temper quantitative analysis with qualitati

  9. Breckinridge Project, initial effort

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1982-09-01

    Report III, Volume 1 contains those specifications numbered A through J, as follows: General Specifications (A); Specifications for Pressure Vessels (C); Specifications for Tanks (D); Specifications for Exchangers (E); Specifications for Fired Heaters (F); Specifications for Pumps and Drivers (G); and Specifications for Instrumentation (J). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project, and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available to the Initial Effort (Phase Zero) work performed by all contractors and subcontractors. Report III, Volume 1 also contains the unique specifications prepared for Plants 8, 15, and 27. These specifications will be substantially reviewed during Phase I of the project, and modified as necessary for use during the engineering, procurement, and construction of this project.

  10. Enhanced project management tool

    Science.gov (United States)

    Maluf, David A. (Inventor); Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  11. HIRFL-CSR project

    International Nuclear Information System (INIS)

    Zhan, W.L.; Xia, J.W.; Wei, B.W.; Yuan, Y.J.; Zhao, H.W.; Man, K.T.; Dang, J.R.; Yuan, P.; Gao, D.Q.; Yang, X.T.; Song, M.T.; Zhang, W.Z.; Xiao, G.Q.; Cai, X.H.; Tang, J.Y.; Qiao, W.M.; Yang, X.D.; Wang, Y.F.

    2001-01-01

    HIRFL-CSR, the project that was proposed to upgrade the HIRFL facility, is a multifunctional Cooling Storage Ring (CSR) system, consisting of a main ring (CSRm) and an experimental ring (CSRe). The heavy ion beams from the HIRFL will be injected, accumulated, cooled and accelerated to high energy in the CSRm, then fast-extracted to produce radioactive ion beams (RIB), highly-charged stage ions, or slow-extracted to do experiment. The secondary beams will be accepted by CSRe and used for internal-target experiments of the high sensitive and high precision spectroscopy with cool beam. CSR project was started in end of 1999 and finish in the end of 2004. The period from beginning of 2000 to the summer of 2001 is the time for the building construction, fabrication design, prototype experiments. In this paper, the outline and status of the project will be reported

  12. Kryolize - KT Fund Project

    CERN Multimedia

    CERN. Geneva

    2016-01-01

    Safety standards and best practices do exist in the field of cryogenics but, as in most domains, they are generally inserted in a few ‘envelope’ cases commonly used in the industry, whereas applicability to the particularity of research facilities are not fully tailored to its needs. The main objective in these cases is to find a harmonised approach, based on lessons learnt and scientific knowledge. The Kryolize Project was created in order to produce tools with a harmonized approach to size pressure relief devices for cryogenic applications. In view of disseminating such tools to other institutes and industrial partners, the project was submitted to CERN’s KT Fund committee. This talk will focus on the process and deliverables of the KT-Funded Kryolize project, including the method on how to cope with the sizing of pressure relief devices and the R&D collaboration agreement between CERN and Karlsruhe Institute of Technology for an experimental programme.

  13. Art in Hospitals Project

    DEFF Research Database (Denmark)

    Baceviciute, Sarune; Bruni, Luis Emilio; Burelli, Paolo

    The idea of this pilot experiment within the context of the “Art in Hospitals” project was to explore the fruitfulness and future perspectives for integrating psychophysiological methods to the ethnographic approach so far implemented in the project. As a pilot study it serves to open the doors...... to experimental avenues that can support the ethnographic investigation. Therefore in order to form a basis for applications of these methodologies in future studies in the field, this pilot was concentrated in one of the initial premises of the project, which intended to challenge current recommendations for art...... in hospitals. Most of these guidelines favor figurative over abstract art, based on ideas leaning to the emotional congruence theory, which would claim that abstract art leads to ambiguity and therefore it could augment the current emotional base-line of an already stressed patient. The early ethnographic...

  14. Sun light European Project

    Science.gov (United States)

    Soubielle, Marie-Laure

    2015-04-01

    2015 has been declared the year of light. Sunlight plays a major role in the world. From the sunbeams that heat our planet and feed our plants to the optical analysis of the sun or the modern use of sun particles in technologies, sunlight is everywhere and it is vital. This project aims to understand better the light of the Sun in a variety of fields. The experiments are carried out by students aged 15 to 20 in order to share their discoveries with Italian students from primary and secondary schools. The experiments will also be presented to a group of Danish students visiting our school in January. All experiments are carried out in English and involve teams of teachers. This project is 3 folds: part 1: Biological project = what are the mechanisms of photosynthesis? part 2: Optical project= what are the components of sunlight and how to use it? part 3: Technical project= how to use the energy of sunlight for modern devices? Photosynthesis project Biology and English Context:Photosynthesis is a process used by plants and other organisms to convert light energy, normally from the Sun, into chemical energy that can later fuel the organisms' activities. This chemical energy is stored in molecules which are synthesized from carbon dioxide and water. In most cases, oxygen is released as a waste product. Most plants perform photosynthesis. Photosynthesis maintains atmospheric oxygen levels and supplies all of the organic compounds and most of the energy necessary for life on Earth. Outcome: Our project consists in understanding the various steps of photosynthesis. Students will shoot a DVD of the experiments presenting the equipments required, the steps of the experiments and the results they have obtained for a better understanding of photosynthesis Digital pen project Electricity, Optics and English Context: Sunlight is a complex source of light based on white light that can be decomposed to explain light radiations or colours. This light is a precious source to create

  15. Project Cowboy. Completion report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1960-11-01

    Project Cowboy was an experiment undertaken to validate a seimic decoupling theory. The theory postulates that the seismic effects of any explosive energy release can be reduced by detonation in a cavity (decoupled) instead of in a packed and tamped (coupled) cavity. Project Cowboy consisted of detonating a series of chemical high explosives emplaced in a deep ({similar_to}800 ft.) underground spherical cavity and of comparing the seismic effects of these explosions with the effects of the detonation of identical charges packed into tamped drill holes. This report describes the project management activities in 1959 and 1960, the engineering planning, expenditures, and excavation progress at the salt deposit site in Louisiana. (LCL)

  16. The CODATwins Project

    DEFF Research Database (Denmark)

    Silventoinen, Karri; Jelenkovic, Aline; Sund, Reijo

    2015-01-01

    projects, including both monozygotic (MZ) and dizygotic (DZ) twins, using various sources. We asked for individual level data on height and weight including repeated measurements, birth related traits, background variables, education and smoking. By the end of 2014, 48 projects participated. Together, we...... estimates of height, BMI and their trajectories over the life course between birth cohorts, ethnicities and countries, and (2) to study the effects of birth-related factors, education and smoking on these anthropometric traits and whether these effects vary between twin cohorts. We identified 67 twin...... have 893,458 height and weight measures (52% females) from 434,723 twin individuals, including 201,192 complete twin pairs (40% monozygotic, 40% same-sex dizygotic and 20% opposite-sex dizygotic) representing 22 countries. This project demonstrates that large-scale international twin studies...

  17. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob

    1997-01-01

    It is widely recognized that the increasingly dynamic and competitive business environment requires the exploration and integration of specialized knowledge from different domains in order to create innovative and competitive artefacts and reduce design and development costs. This paper presents...... the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions...

  18. Radiology Architecture Project Primer.

    Science.gov (United States)

    Sze, Raymond W; Hogan, Laurie; Teshima, Satoshi; Davidson, Scott

    2017-12-19

    The rapid pace of technologic advancement and increasing expectations for patient- and family-friendly environments make it common for radiology leaders to be involved in imaging remodel and construction projects. Most radiologists and business directors lack formal training in architectural and construction processes but are expected to play significant and often leading roles in all phases of an imaging construction project. Avoidable mistakes can result in significant increased costs and scheduling delays; knowledgeable participation and communication can result in a final product that enhances staff workflow and morale and improves patient care and experience. This article presents practical guidelines for preparing for and leading a new imaging architectural and construction project. We share principles derived from the radiology and nonradiology literature and our own experience over the past decade completely remodeling a large pediatric radiology department and building a full-service outpatient imaging center. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  19. The Manhattan project

    International Nuclear Information System (INIS)

    Alexieff, A.

    2010-01-01

    The author reports the history of the Manhattan project which was launched in 1942 with the objective of building an A bomb at any price and as soon as possible. This lead to the fabrication of two types of bomb, one using uranium in gun mode, and the other using plutonium in implosion mode. The author recalls the creation of different scientific and nuclear institutions, the development of several installations (Los Alamos, Hanford, Oak Ridge). He outlines the project secrecy (President Truman did not know anything about it when he became president), and recalls the final tests, the bombing of Hiroshima and Nagasaki, and the last moment of the Manhattan Project after the end of the war. In conclusion, he notices that this nuclear era allowed a direct confrontation to be avoided despite the several crises which occurred during about two decades after the war

  20. NAESA Augmentation Pilot Project

    Science.gov (United States)

    Hoover, John J.

    1998-01-01

    This project was one project within the Native American Earth and Space Academy (NAESA). NAESA is a national initiative comprised of several organizations that support programs which focus on 1) enhancing the technological, scientific and pedagogical skills of K-14 teachers who instruct Native Americans, 2) enhancing the understanding and applications of science, technology, and engineering of college-bound Native Americans and teaching them general college "survival skills" (e.g., test taking, time management, study habits), 3) enhancing the scientific and pedagogical skills of the faculty of tribally-controllcd colleges and community colleges with large Native American enrollments, and 4) strengthening the critical relationships between students, their parents, tribal elders, and their communities. This Augmentation Pilot Project focused on the areas of community-school alliances and intemet technology use in teaching and learning and daily living addressing five major objectives.

  1. PSO Project 10085

    DEFF Research Database (Denmark)

    Jappe Frandsen, Flemming; Wu, Hao; Glarborg, Peter

    Co-combustion of refuse derived fuels (RDF) with coal in pulverized coal-fired power plants can potentially increase the electrical efficiency of utilizing RDF and reduce the formation of some harmful pollutants such as dioxins. The objective of this project was to provide a general assessment...... materials during pyrolysis was conducted through thermogravimetric experiments. In general, the results obtained from this project have significantly improved the understandings of fuel conversion, ash transformation, ash deposition, and pollutant formation during co-combustion of coal and refuse derived...... of the technical issues related to co-combustion of coal and RDF, and to improve the fundamental understandings of this subject. The project was carried out in collaboration between the CHEC Research Centre at DTU Chemical Engineering and DONG Energy Power A/S, and was financially supported by Energinet...

  2. Alligator Rivers analogue project

    International Nuclear Information System (INIS)

    Duerden, P.

    1990-01-01

    Australian Nuclear Science and Technology Organization has extensively evaluated uranium ore bodies in the Alligator Rivers Uranium Province in Australia as analogues of radioactive waste repositories. The work was extended for a three-year program as an international project based on the Koongarra uranium deposit and sponsored by the OECD Nuclear Energy Agency. The technical program comprises six major sub-projects involving modelling and experimental work: modelling of radionuclide migration; hydrogeology of the Koongarra uranium deposit; uranium/thorium series disequilibria studies; groundwater and colloid studies; fission product studies; transuranic nuclide studies; an outline of the technical programs and a summary of progress in the technical sub-projects is given. This is followed by a series of technical reports which briefly describe current research tasks, and which have been separately indexed

  3. Virtual Project Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    changes in both the technology structures and the collaborative practice; and 2) that establishing the social context within virtual project teams comprises negotiations of shared meaning bridging discontinuities typically associated with geographical distribution such as culture, work practices...... in virtual project teams whose members are spread across various geographical locations. The aim is to understand the specific factors, conditions and challenges underpinning such situations. This thesis describes, analyses and discusses three in-depth empirical studies on the practices and use of groupware...... technology in six real-life virtual teams, two in industry and four in education, applying interpretative research and action research methods. Two main lines of investigation are pursued: the first involves an examination of the organisational issues related to groupware adaptation in virtual project teams...

  4. HSAPS market analysis project

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckner, Ronny; Aaberg, Rolf Jarle

    2006-12-15

    The H-SAPS (Hydrogen Stand-Alone Power System) project, an EU project within the ALTENER programme in the period 2002-2004, was initiated to determine the potential for the introduction of environmentally benign hydrogen technology in what is believed to be a near-term market, namely stand-alone power systems (SAPS). The objective of the project was to examine the technological, political, social and economical factors affecting the emergence of hydrogen technology in the stand-alone power system market today and in the future. The scope of the project was limited to small and medium sized stand-alone power systems, up to a few hundred kilowatts (kW) power rating and based on renewable energy as the primary energy source. The work was divided into five phases: (1) Inception, (2) Data collection and analysis, (3) Market analysis and barrier removal, (4) Dissemination, and (5) Final report. Separate reports were written on these topics, and later summarised this final report. The H-SAPS-project identified the following critical technical barriers (in prioritized order): (1) High costs of both electrolyser and fuel cell solutions, (2) Short lifetime warranties and little lifetime experience for PEM electrolysers and PEM fuel cells, (3) Low energy efficiency of the hydrogen energy system (critical for small systems), and (4) The need to develop easy-to-use and energy efficient gas and electricity control systems. One of the main conclusions from the project is that there is a need to focus on interim solutions, based on conventional energy technologies (e.g., internal combustion engines instead of fuel cells), in order for H-SAPS to compete in the near-term SAPS-market (author) (ml)

  5. HSAPS market analysis project

    International Nuclear Information System (INIS)

    Gloeckner, Ronny; Aaberg, Rolf Jarle

    2006-12-01

    The H-SAPS (Hydrogen Stand-Alone Power System) project, an EU project within the ALTENER programme in the period 2002-2004, was initiated to determine the potential for the introduction of environmentally benign hydrogen technology in what is believed to be a near-term market, namely stand-alone power systems (SAPS). The objective of the project was to examine the technological, political, social and economical factors affecting the emergence of hydrogen technology in the stand-alone power system market today and in the future. The scope of the project was limited to small and medium sized stand-alone power systems, up to a few hundred kilowatts (kW) power rating and based on renewable energy as the primary energy source. The work was divided into five phases: (1) Inception, (2) Data collection and analysis, (3) Market analysis and barrier removal, (4) Dissemination, and (5) Final report. Separate reports were written on these topics, and later summarised this final report. The H-SAPS-project identified the following critical technical barriers (in prioritized order): (1) High costs of both electrolyser and fuel cell solutions, (2) Short lifetime warranties and little lifetime experience for PEM electrolysers and PEM fuel cells, (3) Low energy efficiency of the hydrogen energy system (critical for small systems), and (4) The need to develop easy-to-use and energy efficient gas and electricity control systems. One of the main conclusions from the project is that there is a need to focus on interim solutions, based on conventional energy technologies (e.g., internal combustion engines instead of fuel cells), in order for H-SAPS to compete in the near-term SAPS-market (author) (ml)

  6. Brazilian Eratosthenes Project

    Science.gov (United States)

    Langhi, R.; Vilaça, J.

    2014-10-01

    The objective of Brazilian Eratosthenes Project is the development and application of teaching training actions according the ``docent autonomy" concept to basic Astronomy Education. Argentina coordinates the project in South America, but Brazil works in this project since 2010 with the theme ``Projeto Eratóstenes Brasil" in the homepage: http://sites.google.com/site/projetoerato. Two schools measure a sticks shadow and communicate their results. After, they calculate an average radius of Earth. The stick (gnomon) should stay in vertical position in the leveled ground. Since 2010, the project received hundreds of Brazilian schools with different experiments that were constructed with autonomy, because our site doesn't show some itinerary pre-ready to elaborate the experiments. To collect data for our research, we will use interviews via Skype with the teachers. These data are useful to researches about Science Education area and the Teaching Formation. Teaching professional practice could change and we see modifications in the teachers work, what depends of their realities and context. This project intents to respect the docent autonomy. This autonomy to responsible modifications during continued formation is called ``activist formative model" according Langhi & Nardi (Educação em Astronomia: repensando a formação de professores. São Paulo: Escrituras Editora, 2012). This project discusses about researches in Astronomy Education - still extreme rare in Brazil, when we compare with other areas in Science Education. We believe that actions like this could motivate the students to learn more Astronomy. Furthermore, this national action can be a rich source of data to investigations about teaching formation and scientific divulgation.

  7. Urban transportation projects conceptualised:

    DEFF Research Database (Denmark)

    Pineda, Andres Felipe Valderrama

    is straightforward: transportation projects transform cities. The paradoxical reality thus is that a problem that has been traditionally conceptualized in technical terms (transportation engineering, transportation economics, planning theory, traffic engineering, urban planning, etc.), has tremendous consequences...... operation when discussing transportation projects in big cities. The tradition of Science and Technology Studies might have provided some clues. In the following paper we discuss the most prominent aspects of some theories in STS in order to understand and conceptualize the cases of Bogotá and Copenhagen...

  8. Mini Project Programming Exams

    DEFF Research Database (Denmark)

    Nørmark, Kurt; Thomsen, Lone Leth; Torp, Kristian

    2008-01-01

    A number of different types of final programming exams used or considered at the Department of Computer Science, Aalborg University, are identified and analyzed. Based on this analysis, a new type of programming exam is introduced called a Mini Project Programming (MIP) exam. MIP is a group...... years. The MIP exam is a compromise between (1) a long problem-based project exam and (2) a short oral or written programming exam. It is concluded that the strengths of MIP are the high degree of realism in the exam assignment and comprehensiveness relative to the course syllabus. The main challenge...

  9. FLOAT Project - Task 1

    DEFF Research Database (Denmark)

    Marchalot, Tanguy; Kofoed, Jens Peter; Sørensen, Eigil V.

    The objective of the FLOAT project is to study the reliability of high-performance fibre-reinforced concrete, also known as Compact Reinforced Composite (CRC), for the floats of wave energy converters. In order to reach commercial breakthrough, wave energy converters need to achieve a lower price.......com, 2011). CRC floats could be a very cost-effective technology with enhanced loading capacity and environmental resistance, and very low maintenance requirements, affecting directly the final energy price. The project involves DEXA Wave Energy Ltd, Wave Star A/S, Aalborg University and Hi-Con A...

  10. Biofuels: Project summaries

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The US DOE, through the Biofuels Systems Division (BSD) is addressing the issues surrounding US vulnerability to petroleum supply. The BSD goal is to develop technologies that are competitive with fossil fuels, in both cost and environmental performance, by the end of the decade. This document contains summaries of ongoing research sponsored by the DOE BSD. A summary sheet is presented for each project funded or in existence during FY 1993. Each summary sheet contains and account of project funding, objectives, accomplishments and current status, and significant publications.

  11. Fast breeder project (PSB)

    International Nuclear Information System (INIS)

    1976-07-01

    Activities performed during the 1st quarter of 1976 at or on behalf of the Gesellschaft fuer Kernforschung mbH, Karlsruhe, within the framework of the Fast Breeder Project are given a survey. The following project subdivisions are dealt with: Fuel rod development; materials testing and developments; corrosion studies and coolant analyses; physical experiments; reactor theory; safety of fast breeders; instrumentation and signal processing for core monitoring; effects on the environment; sodium technology tests; thermodynamic and fluid flow tests in gas. (HR) [de

  12. Agile Project Portfolio Management

    DEFF Research Database (Denmark)

    Andersen, Jesper Rank; Riis, Jens Ove; Mikkelsen, Hans

    2005-01-01

    This paper will provide a preliminary introduction to the application of Agile Thinking in management of project portfolio and company development. At any point in time, companies have a crowd of development initiatives spread around the organisation and managed at different levels...... in the managerial hierarchy. They compete for resources and managerial attention, and they often take too long time - and some do not survive in the rapid changing context. Top man¬agers ask for speed, flexibility and effectiveness in the portfolio of development activities (projects). But which competencies...

  13. Pilot project as enabler?

    DEFF Research Database (Denmark)

    Neisig, Margit; Glimø, Helle; Holm, Catrine Granzow

    This article deals with a systemic perspective on transition. The field of study addressed is a pilot project as enabler of transition in a highly complex polycentric context. From a Luhmannian systemic approach, a framework is created to understand and address barriers of change occurred using...... pilot projects as enabler of transition. Aspects of how to create trust and deal with distrust during a transition are addressed. The transition in focus is the concept of New Public Management and how it is applied in the management of the Employment Service in Denmark. The transition regards...

  14. Human Genome Project

    Energy Technology Data Exchange (ETDEWEB)

    Block, S. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Cornwall, J. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Dally, W. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Dyson, F. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Fortson, N. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Joyce, G. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Kimble, H. J. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Lewis, N. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Max, C. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Prince, T. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Schwitters, R. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Weinberger, P. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Woodin, W. H. [The MITRE Corporation, McLean, VA (US). JASON Program Office

    1998-01-04

    The study reviews Department of Energy supported aspects of the United States Human Genome Project, the joint National Institutes of Health/Department of Energy program to characterize all human genetic material, to discover the set of human genes, and to render them accessible for further biological study. The study concentrates on issues of technology, quality assurance/control, and informatics relevant to current effort on the genome project and needs beyond it. Recommendations are presented on areas of the genome program that are of particular interest to and supported by the Department of Energy.

  15. The Key Lake project

    International Nuclear Information System (INIS)

    1991-01-01

    Key Lake is located in the Athabasca sand stone basin, 640 kilometers north of Saskatoon, Saskatchewan, Canada. The three sources of ore at Key Lake contain 70 100 tonnes of uranium. Features of the Key Lake Project were described under the key headings: work force, mining, mill process, tailings storage, permanent camp, environmental features, worker health and safety, and economic benefits. Appendices covering the historical background, construction projects, comparisons of western world mines, mining statistics, Northern Saskatchewan surface lease, and Key Lake development and regulatory agencies were included

  16. The Colibri Project

    DEFF Research Database (Denmark)

    Lopez, Jose Manuel Guterrez Lopez; Frick, Jan; Kirikova, Marite

    2015-01-01

    Colibri (Collaboration and Innovation for Better, Personalized and IT-Supported Teaching) is a three year project co-funded by the Erasmus + Strategic Partnership, starting in 2014. The project is being carried out by seven academic, two industrial, and one governmental organisation partners from...... course on Future Internet Opportunities is part of the Living Lab, followed by 28 students and given by more than 10 different teachers. Both the teachers and the students represent different fields within computer science, electrical engineering, telecommunications, business informatics, management...

  17. Cooperative Projects - Challenges and Opportunities

    Science.gov (United States)

    Schubotz, Wiebke; Brücher, Tim; Vamborg, Freja

    2017-04-01

    Today's research in Germany is often organized in large projects and collaborations, so-called cooperative projects ("Verbundprojekte" in German). These projects are defined by a large number of members (more than 50) and participating institutes, e.g. institutes of research organizations such as the Max-Planck society and the Leibniz association, Helmholtz centres, and universities. For coordination purposes these projects usually have a general project manager or project coordinator close to the speaker of the project. Despite this overarching position, it is often challenging for the project manager to really overview the entire project as he is, for example, not involved in the individual institute's recruitment processes or research connections to other institutes via other projects. Additionally, there is neither a formal obligation for the principal investigators and project scientists to report changes within their sub-projects, nor any formal dependency between these sub-projects and the coordination office to ensure a contemporary update of changes and progress in their specific tasks of the project. Therefore, the idea of a coordinating position to oversee the entire cooperative project is sometimes difficult to reach. Furthermore, project managers usually have no formal connection to other project managers. This means that recurrent tasks, for which cooperation between project managers would be helpful, need to be reinvented for each project anew. Due to the lack of this more formalized cooperation between project managers, acquired expertise is often lost. We will illustrate the challenges of this kind of project management based on projects at the Max Planck Institute for Meteorology (Hamburg) and the Helmholtz Centre for Ocean Research (GEOMAR, Kiel), but also point out opportunities that arise within a large collaboration of partners. Moreover, we present an approach to coordinate management processes in order to overcome some of the aforementioned

  18. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  19. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  20. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...... important questions relating to stakeholders and dynamic complexity needed greater attention for the project to be successful....

  1. Breakthrough Propulsion Physics Project: Project Management Methods

    Science.gov (United States)

    Millis, Marc G.

    2004-01-01

    To leap past the limitations of existing propulsion, the NASA Breakthrough Propulsion Physics (BPP) Project seeks further advancements in physics from which new propulsion methods can eventually be derived. Three visionary breakthroughs are sought: (1) propulsion that requires no propellant, (2) propulsion that circumvents existing speed limits, and (3) breakthrough methods of energy production to power such devices. Because these propulsion goals are presumably far from fruition, a special emphasis is to identify credible research that will make measurable progress toward these goals in the near-term. The management techniques to address this challenge are presented, with a special emphasis on the process used to review, prioritize, and select research tasks. This selection process includes these key features: (a) research tasks are constrained to only address the immediate unknowns, curious effects or critical issues, (b) reliability of assertions is more important than the implications of the assertions, which includes the practice where the reviewers judge credibility rather than feasibility, and (c) total scores are obtained by multiplying the criteria scores rather than by adding. Lessons learned and revisions planned are discussed.

  2. Stock Market Project.

    Science.gov (United States)

    Distel, Brenda D.

    This project is designed to teach students the process of buying stocks and to tracking their investments over the course of a semester. The goals of the course are to teach students about the relationships between conditions in the economy and the stock market; to predict the effect of an economic event on a specific stock or industry; to relate…

  3. Russian Language Analysis Project

    Science.gov (United States)

    Serianni, Barbara; Rethwisch, Carolyn

    2011-01-01

    This paper is the result of a language analysis research project focused on the Russian Language. The study included a diverse literature review that included published materials as well as online sources in addition to an interview with a native Russian speaker residing in the United States. Areas of study include the origin and history of the…

  4. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    1989-01-01

    This Topical Report is a synopsis of the decontamination of plant components and structures at the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the preparation activities in support of the shipment of radioactive wastes and the unconditional release of the site and structural materials. 1 ref., 16 figs., 4 tabs

  5. Geothermal injection monitoring project

    Energy Technology Data Exchange (ETDEWEB)

    Younker, L.

    1981-04-01

    Background information is provided on the geothermal brine injection problem and each of the project tasks is outlined in detail. These tasks are: evaluation of methods of monitoring the movement of injected fluid, preparation for an eventual field experiment, and a review of groundwater regulations and injection programs. (MHR)

  6. Linear Projective Program Syntax

    NARCIS (Netherlands)

    Bergstra, J.A.; Bethke, I.

    2004-01-01

    Based on an extremely simple program notation more advanced program features can be developed in linear projective program syntax such as conditional statements, while loops, recursion, use of an evaluation stack, object classes, method calls etc. Taking care of a cumulative and bottom up

  7. Project-Based Science

    Science.gov (United States)

    Krajcik, Joe

    2015-01-01

    Project-based science is an exciting way to teach science that aligns with the "Next Generation Science Standards" ("NGSS"). By focusing on core ideas along with practices and crosscutting concepts, classrooms become learning environments where teachers and students engage in science by designing and carrying out…

  8. ACCESS Project: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Weller, Heiko [Robert Bosch, LLC, Farmington Hills, MI (United States)

    2015-04-01

    The ACCESS project addressed the development, testing, and demonstration of the proposed advanced technologies and the associated emission and fuel economy improvement at an engine dynamometer and on a full-scale vehicle. Improve fuel economy by 25% with minimum performance penalties Achieve SULEV level emissions with gasoline Demonstrate multi-mode combustion engine management system

  9. De Sitter projective relativity

    CERN Document Server

    Licata, Ignazio; Benedetto, Elmo

    2017-01-01

    This book presents the Projective approach to de Sitter Relativity. It traces the development of renewed interest in models of the universe at constant positive curvature such as "vacuum" geometry. The De Sitter Theory of Relativity, formulated in 1917 with Willem De Sitter's solution of the Einstein equations, was used in different fields during the 1950s and 1960s, in the work of H. Bacry, J.M. LevyLeblond and F.Gursey, to name some important contributors. From the 1960s to 1980s, L. Fantappié and G. Arcidiacono provided an elegant group approach to the De Sitter universe putting the basis for special and general projective relativity. Today such suggestions flow into a unitary scenario, and this way the De Sitter Relativity is no more a "missing opportunity" (F. Dyson, 1972), but has a central role in theoretical physics. In this volume a systematic presentation is given of the De Sitter Projective relativity, with the recent developments in projective general relativity and quantum cosmology.

  10. Final Year Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Hubsch, Tristan [Howard University

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  11. Saving gas project

    Energy Technology Data Exchange (ETDEWEB)

    Vasques, Maria Anunciacao S. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Garantizado, Maria Auxiliadora G. [CONCREMAT Engenharia, Rio de Janeiro, RJ (Brazil)

    2009-12-19

    The work presented was implemented in municipalities around the construction of the pipeline project Urucu-Coari-Manaus, the Engineering / IETEG-IENOR, because of the constant release of workers, consequently the finishing stages of this work and its future completion. The Project aims to guide saving gas with the workforce, their families and communities to the enterprise of small business cooperatives and solidarity within the potential of the site. This project is developed through the workshops: entrepreneur ship, tourism, use, reuse and recycling of products, and hortifruiti culture, agroecology, agribusiness (cooperativism solidarity) and forestry. Its execution took place in two phases, the first called 'pilot' of 12/12/2007 to 27/03/2008 in sections A and B1, in the municipality of Coari stretch and B2 in Caapiranga. The second phase occurred from 30/06 to 27/09/08, in the words B1, in the municipalities of Codajas and Anori words and B2 in Iranduba, Manacapuru and Anama. The workshops were held in state and municipal schools and administered by the Institute of Social and Environmental Amazon - ISAM, which had a team of coordinators, teachers, experts and masters of the time until the nineteen twenty-two hours to implement the project. (author)

  12. The Castle Project

    Energy Technology Data Exchange (ETDEWEB)

    Tom Anderson; David Culler; James Demmel; Jerry Feldman; Susan Graham; Paul Hilfinger; Katherine Yelick

    2000-02-16

    The goal of the Castle project was to provide a parallel programming environment that enables the construction of high performance applications that run portably across many platforms. The authors approach was to design and implement a multilayered architecture, with higher levels building on lower ones to ensure portability, but with care taken not to introduce abstractions that sacrifice performance.

  13. Science in Schools Project

    Science.gov (United States)

    Waugh, Mike

    As part of a program to increase learning and engagement in science classes 124 Victorian schools are trialing a best practice teaching model. The Science in Schools Research Project is a DEET funded project under the Science in Schools Strategy, developed in response to recent research and policy decisions at national and state levels through which literacy, numeracy and science have been identified as key priorities for learning. This major science research project aims to identify, develop and trial best practice in Science teaching and learning. The Department will then be able to provide clear advice to Victoria's schools that can be adopted and sustained to: * enhance teaching and learning of Science * enhance student learning outcomes in Science at all year levels * increase student access to, and participation in Science learning from Prep through to Year 10, and hence in the VCE as well. The nature of the SiS program will be detailed with specific reference to the innovative programs in solar model cars, robotics and environmental science developed at Forest Hill College in response to this project.

  14. The Crime Lab Project.

    Science.gov (United States)

    Hein, Annamae J.

    2003-01-01

    Describes the Crime Lab Project, which takes an economical, hands-on, interdisciplinary approach to studying the career of forensics in the middle or high school classroom. Includes step-by-step student requirements for the investigative procedure, a sample evidence request form, and an assessment rubric. (KHR)

  15. Project Management Metrics

    Directory of Open Access Journals (Sweden)

    Radu MARSANU

    2010-04-01

    Full Text Available Metrics and indicators used for the evaluation of the IT projects management have the advantage of providing rigorous details about the required effort and the boundaries of the IT deliverables. There are some disadvantages, as well, due to the fact the input data contains errors and the value of metrics depends on the quality of data used in models.

  16. Project Management Metrics

    OpenAIRE

    Radu MARSANU

    2010-01-01

    Metrics and indicators used for the evaluation of the IT projects management have the advantage of providing rigorous details about the required effort and the boundaries of the IT deliverables. There are some disadvantages, as well, due to the fact the input data contains errors and the value of metrics depends on the quality of data used in models.

  17. The Habitat Project

    Science.gov (United States)

    Hein, Annamae J.

    2011-01-01

    The Habitat Project is a multiday, differentiated, interdisciplinary environmental science lesson that incorporates skill-building and motivational strategies to internalize ecosystem vocabulary. Middle school students research an animal, display its physical characteristics on a poster, build a three-dimensional habitat and present their work…

  18. The ULICE project

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    ULICE is an infrastructure project funded by EC to address two different and complementary issues in cancer hadron therapy: the development of the appropriate instruments for high-performance hadrontherapy, with particular emphasis on carbon ion therapy, and the need for intensive collaboration among the existing and planned centres, as well as with the European hadrontherapy community at large.

  19. Kvanefjeld uranium project

    International Nuclear Information System (INIS)

    1983-09-01

    Overall investments connected with project start constitute approx. Dkr. 3.500 million for the uranium mine, approx. Dkr. 1,100 milion for the hydroelectric station, and approx. Dkr. 400 million for the social infrastructure, adding up to approx. Dkr. 5 billion. This corresponds to Greenlands's gross domestic product over two years or total exports over three years. The effect on employment in the construction phase is assumed to be 650 jobs on average, of which 25%, or approx. 150 jobs, can be filled by Greenland labour. The value of the project on Greenland's economy has been calculated according to its contribution to both the GDP and GNP. The GDP denotes the added value created in a community through production of goods and services in all trades, including public services. The GNP denotes that part of the DGP accruing to the citizens of a country, in this case Greenlanders. Large capital expenditures will be applied towards payment of interest and depreciation. These amounts consitute approx. 70 % of project earnings, measured as its contribution to GDP. The contribution to GNP amounts to approx. Dkr. 170 million per year i the construction phase. However, lack of official data for Greenland's economy makes it difficult to relate these results to other business activities or to assess their size exactly in relation to Greenland's economy. The underlying trend of the calculations is clear nevertheless. The project will have a significant, favourable effect on national accounts and will provide a large number of job openings for Greenland workers. (EG)

  20. Ranger uranium project

    International Nuclear Information System (INIS)

    1979-01-01

    This agreement between the Commonwealth of Australia, Peko-Wallsend Operations Ltd., Electrolytic Zinc Company of Australasia Limited, and the Australian Atomic Energy Commission sets out articles under which the Ranger uranium project in the Northern Territory of Australia is to be operated

  1. Project Choice: Lessons Learned.

    Science.gov (United States)

    Ewing Marion Kauffman Foundation, Kansas City, MO.

    Project Choice began with a simple goal: to increase the number of inner-city students who graduate from high school on time and become productive members of society. To that end, Ewing M. Kauffman, his Foundation, and associates designed and implemented a program that promised postsecondary education or training to some students in the Kansas…

  2. Maps into projective spaces

    Indian Academy of Sciences (India)

    We show that the moduli space of morphisms of a fixed degree from to a projective space has a smooth compactification. As another application of the cohomology of the Picard bundle, we compute a top intersection number for the moduli space confirming the Vafa–Intriligator formulae in the nodal case.

  3. Nuclear safeguards project

    International Nuclear Information System (INIS)

    Mache, H.R.

    1978-10-01

    The present report describes the major activities carried out in 1977 in the framework of the Nuclear Safeguards Project by the institutes of the Kernforschungszentrum Karlsruhe, Kernforschungsanlage Juelich, the European Institute of Transuranium Elements and some industrial firms. (orig.) 891 HP 892 AP [de

  4. Exploring Project Management Education

    NARCIS (Netherlands)

    Steven Nijhuis

    2017-01-01

    From the article: "The object of this paper is to explore the actual practice in project management education in the Netherlands and compare it to reference institutions and recent literature. A little over 40% of the Higher Education institutions in the Netherlands mentions PM education in

  5. The Microchip Optera Project

    National Research Council Canada - National Science Library

    Moss, Cynthia; Horiuchi, Timothy K

    2006-01-01

    .... The long-term goal of this project is to build a tiny, low-power, neuromorphic VLSI-based model of an FM bat echolocation system that can be demonstrated in an aerial target capture task using a flying vehicle...

  6. IPAD project overview

    Science.gov (United States)

    Fulton, R. E.

    1980-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace-Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of technology and associated software for integrated company-wide management of engineering information. The project has been underway since 1976 under the guidance of an Industry Technical Advisory Board (ITAB) composed of representatives of major engineering and computer companies and in close collaboration with the Air Force Integrated Computer-Aided Manufacturing (ICAM) program. Results to date on the IPAD project include an in-depth documentation of a representative design process for a large engineering project, the definition and design of computer-aided design software needed to support that process, and the release of prototype software to integrate selected design functions. Ongoing work concentrates on development of prototype software to manage engineering information, and initial software is nearing release.

  7. Ranger uranium project

    International Nuclear Information System (INIS)

    1979-01-01

    Details are given of an agreement between Peko-Wallsend Operations Ltd., Electrolytic Zinc Company of Australasia Limited, the Australian Atomic Energy Commission and Ranger Uranium Mines Pty. Ltd. regarding the management of the joint Ranger uranium project in the Northern Territory of Australia

  8. CLIC project timeline

    CERN Multimedia

    CLIC, Compact Linear Collider Project

    2018-01-01

    The CLIC project timeline. Current plan is to start at sqrt(s)=380 GeV for Higgs and top quark precision physics and upgrade up to 3 TeV. This timeline represent a purely technical schedule and assumes support at the European Strategy for Particle Physics (ESPP) in 2020 and available funding.

  9. Framing Light Rail Projects

    DEFF Research Database (Denmark)

    Olesen, Mette

    2014-01-01

    In Europe, there has been a strong political will to implement light rail. This article contributes to the knowledge concerning policies around light rail by analysing how local actors frame light rail projects and which rationalities and arguments are present in this decision-making process...

  10. Northeast project/CNEN

    International Nuclear Information System (INIS)

    Alves, R.N.; Ribeiro, G.F.; Lima, J.O.V.; Dornelles, G.H.; Laborne, J.J.; Sakamoto, L.H.; Lemos Junior, O.F.

    1987-10-01

    The subprojects from the Northeast/CNEN project, that aims to disseminate the benefits of nuclear energy are described. Those subprojects are the following: food conservation, energy, health, hydric resources, mineral and agriculture, all of them have as goal to improve the socio-economical conditions of the northeast population in Brazil. (E.G.) [pt

  11. Transfer metrics analytics project

    CERN Document Server

    Matonis, Zygimantas

    2016-01-01

    This report represents work done towards predicting transfer rates/latencies on Worldwide LHC Computing Grid (WLCG) sites using Machine Learning techniques. Topic covered are technologies used for the project, data preparation for ML suitable format and attribute selection as well as a comparison of different ML algorithms.

  12. The Herpetology Project

    Science.gov (United States)

    Vacchina, Peter; Aguirre, Mary

    2008-01-01

    In this article, the authors describe their ongoing experience with the Herpetology Project. Through this field study, students catch and track amphibians and reptiles in the Assabet River area, record and analyze data, share their findings with the community, and ultimately, work toward protecting turtles' habitats. The authors chose to focus on…

  13. The Pumpkin Project

    Science.gov (United States)

    Hardman, Bonnie

    2005-01-01

    Ms. Hardman's group of special education students were supposed to be "difficult." But their engagement in a novel interdisciplinary project had a transformative effect -- on them, on their teachers, and even on individuals far beyond their school. This article describes children and their experiences in a special education class and how they…

  14. OECD Halden Reactor Project

    International Nuclear Information System (INIS)

    1988-01-01

    The OECD Halden Reactor project is an agreement between OECD member countries. It was first signed in 1958 and since then regularly renewed every third year. The activities at the Project is centred around the Halden heavy water rector, the HBWR. The reseach programme comprizes studies of fuel performance under various operating conditions, and the application of computers for process control. The HBWR is equipped for exposing fuel rods to temperatures and pressures, and at heat ratings met in modern BWR's and PWR's. A range of in-core instruments are available, permitting detailed measurements of the reactions of the fuel, including mechanical deformations, thermal behaviour, fission gas release, and corrosion. In the area of computer application, the studies of the communication between operator and process, and the surveillance and control of the reactor core, are of particular interst for reactor operation. 1988 represents the 30th year since the Project was started, and this publication is produced to mark this event. It gives and account of the activities and achievements of the Project through the years 1958-1988

  15. OECD Halden Reactor Project

    International Nuclear Information System (INIS)

    1983-01-01

    The OECD Halden Reactor Project is both the oldest and the only one still in operation of the three major joint undertakings established at the inception of the OECD Nuclear Energy Agency. This publication has been printed in connection with its twenty-fifth anniversary as an international project. After presentation of the history and organization of the project, a thorough description of the past and present activities in the field of fuel performance and process control and surveillance is given. The projects's fuel testing programme is now focuessed on an investigation to define safety margins under normal operations as well as under various kinds of accident situations. Fuel research is also concerned with the characterisation of long term effects with regard to efficiency, operational safety and mapping of reliability and durability in the case of accidents with loss of coolant. In the field of process control and surveillance, research work is directly linked to the use of computers and colour graphics as tools in the control room. A fullscale simulator-based model and experimental control room has been constructed. The first experiments to be carried out in this laboratory will investigate the advantage of analysing alarms before they are presented to the operator. (RF)

  16. The BIOEXPLOIT Project

    NARCIS (Netherlands)

    Goverse, A.; Smant, G.; Bouwman-Smits, L.; Bakker, E.H.; Bakker, J.

    2009-01-01

    The EU Framework 6 Integrated Project BIOEXPLOIT concerns the exploitation of natural plant biodiversity for the pesticide-free production of food. It focuses on the pathogens Phytophthora infestans, Septoria tritici, Blumeria graminis, Puccinia spp. and Fusarium spp. and on the crops wheat, barley,

  17. SIYAZAMA ENTREPRENEURIAL DEVELOPMENT PROJECT ...

    African Journals Online (AJOL)

    The Siyazama Craft Project, an entrepreneurial development intervention for poverty alleviation in Stellenbosch is an example of the boundary spanning role of the academic partner in the Faculty of Theology. This intervention is in line with the community interaction policy of the faculty and the university. The Siyazama.

  18. Icosahedrons: A Multifaceted Project.

    Science.gov (United States)

    Strazdin, Ray

    2000-01-01

    Discusses a project focusing on icosahedrons that combines geometry, structure, graphic design, animation, motion, and mechanical and freehand drawing with ancient Greek catapult mechanics. Includes directions on how to both construct a template and develop the pattern for the icosahedrons. (CMK)

  19. An Infants School Project.

    Science.gov (United States)

    Greenhalgh, Lynn

    1995-01-01

    Describes a wildlife garden developed on school grounds which converted a large, derelict quadrangle into an outdoor classroom used by staff across the curriculum. The area was divided into various habitats including ponds, mini-woodlands, herb garden, hedgerows, wildflower meadow, and bird borders. Preparatory work and projects generated are…

  20. Teaching the Manhattan Project

    Science.gov (United States)

    Schibuk, Elizabeth

    2015-01-01

    This article describes a nuclear chemistry unit on the Manhattan Project, a research effort that led to the development of the world's first nuclear weapons during World War II. The unit is appropriate for an introductory high school chemistry or physics course and takes from four to six weeks. The unit poses this essential question: "Over…

  1. OECD Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    This is the nineteenth annual Report on the OECD Halden Reactor Project, describing activities at the Project during 1978, the last year of the 1976-1978 Halden Agreement. Work continued in two main fields: test fuel irradiation and fuel research, and computer-based process supervision and control. Project research on water reactor fuel focusses on various aspects of fuel behavior under normal, and off-normal transient conditions. In 1978, participating organisations continued to submit test fuel for irradiation in the Halden boiling heavy-water reactor, in instrumented test assemblies designed and manufactured by the Project. Work included analysis of the impact of fuel design and reactor operating conditions on fuel cladding behavior. Fuel performance modelling included characterization of thermal and mechanical behavior at high burn-up, of fuel failure modes, and improvement of data qualification procedures to reduce and quantify error bands on in-reactor measurements. Instrument development yielded new or improved designs for measuring rod temperature, internal pressure, axial neutron flux shape determination, and for detecting cladding defects. Work on computer-based methods of reactor supervision and control included continued development of a system for predictive core surveillance, and of special mathematical methods for core power distribution control

  2. The Urban Boundaries project

    DEFF Research Database (Denmark)

    Pais, Alexandre; Mesquita, M.

    2012-01-01

    lives, than in the formal setting of school education, where they often experience problems of exclusion. Our intention with this paper is to present and discuss an on-going project based in Portugal, where a team of people from different backgrounds are starting to work collaboratively with two...

  3. Project Lifescape 8. Amphibians

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 5; Issue 7. Project Lifescape - Amphibians. R J Ranjit Daniels. Classroom Volume 5 Issue 7 July 2000 pp 71-85 ... Author Affiliations. R J Ranjit Daniels1. Hon. Secretary Chennai Snake Park Trust Rajbhavan Post Chennai 600 022, India.

  4. Projects, Power & Politics

    DEFF Research Database (Denmark)

    Pagh, Jesper; Freudendal-Pedersen, Malene

    2014-01-01

    increasingly takes part through individual but gigantic projects rather than through a comprehensive, coordinated effort, this is even more important to understand. Fortunately, there are lessons to learn from experience collected through decades of research. Bent Flyvbjerg explains his views on the need...

  5. The Ultimate Science Project

    NARCIS (Netherlands)

    Allen, B.

    2010-01-01

    There are six people in space as you read these words. Let that sink in for a moment. Six human beings are zipping around the planet once every 90 minutes, pushing back the boundaries of scientific knowledge and experience. They are, of course, on the International Space Station - a project

  6. The Kyoto project

    DEFF Research Database (Denmark)

    Lund Jensen, Aage

    2003-01-01

    The main aim of the project has been to raise two central questions: 1) Which kind of architectural contemporary elements in the area can be added or changed to create an environmental improvement for the inhabitants. 2) How can a renewed strategic thinking of functional "stacking" create a model...

  7. Smart City project

    KAUST Repository

    Al Harbi, Ayman

    2018-01-24

    A \\'smart city\\' is an urban region that is highly advanced in terms of overall infrastructure, sustainable real estate, communications and market viability. It is a city where information technology is the principal infrastructure and the basis for providing essential services to residents. Yanbu Industrial City- Smart City Project - First large scale smart city in The kingdom.

  8. Perspective Projection Invariants,

    Science.gov (United States)

    1986-02-01

    AD-AI67 793 PERSPECTIVE PROJECTION INVARIANTS(U) MASSACHUSETTS INST 1/1~ OF TECH CAMBRIDGE ARTIFICIAL INTELLIGENCE LAB VERRI ET AL , FEB 86 AI-M-832...some stability properties. On the contrary, zeros of curvature of arbitrary 3D curves do not present any simple kindi of stability. Thus zeros of

  9. Pocos de Caldas Project

    International Nuclear Information System (INIS)

    1988-01-01

    The first annual report of the Pocos de Caldas Project describes the results of the feasibility study established to test the objectives of the work. Boreholes have been drilled at two sites, the Osamu Utsumi uranium mine and Morro do Ferro, to assess the feasibility of using them as natural analogues of radionuclide migration processes. Detailed geochemical analysis and hydrogeological studies are described. (author)

  10. The Puente Project.

    Science.gov (United States)

    Meznek, James; And Others

    The Puente Project is a statewide program that helps Mexican American/Latino community college students in California achieve their academic goals. Puente's goals are to reduce the number of Mexican American/Latino community college students who drop out of school and increase the number who transfer to four-year institutions. To meet these goals,…

  11. The Grammar Movie Project

    Science.gov (United States)

    Kreutner, Edith

    2015-01-01

    In this case study, I will show how directing a movie on grammar can help students improve their oral skills as well as their language competency, team working and planning skills, and also teach them about learning itself. I will present an innovative teaching project that uses the medium of film to get students engaged with grammar and that aims…

  12. Network Visualization Project (NVP)

    Science.gov (United States)

    2016-07-01

    Visualization Project (NVP) by Terry Wen American Society of Engineering Education, Washington, DC Lisa M Marvel Computational and Information Sciences...front-end presentation and construction of the application itself. 15. SUBJECT TERMS computer network traffic, computer network security, computer ...network visualization, network traffic analysis, network forensics 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT UU 18. NUMBER OF

  13. SIYAZAMA ENTREPRENEURIAL DEVELOPMENT PROJECT ...

    African Journals Online (AJOL)

    role in keeping one partner powerless and thus jeopardise the long-term sustainability of projects. Power may be ..... outlets, the fashion world and trends are limited. Unfortunately one cannot manufacture ... This way those who had the idea that they could keep poor quality items for themselves are discouraged to do so.

  14. The History Research Project

    Science.gov (United States)

    Estes, Matt; Brady, Ann

    2005-01-01

    Matt Estes, a social studies teacher, mentions the main instructional goals for his students like understanding the importance of proper citation and attribution presenting the Machiavelli project that deals with the skills he wants his students to develop and the course material that must be covered. In addition, Ann Brady, a library media…

  15. DELPHI time projection chamber

    CERN Document Server

    1989-01-01

    The time projection chamber is inserted inside the central detector of the DELPHI experiment. Gas is ionised in the chamber as a charged particle passes through, producing an electric signal from which the path of the particle can be found. DELPHI, which ran from 1989 to 2000 on the LEP accelerator, was primarily concerned with particle identification.

  16. Oluvil Port Development Project

    DEFF Research Database (Denmark)

    Frigaard, Peter; Margheritini, Lucia

    Oluvil Port Development Project is the first development of a large port infrastructure in the entire eastern coastline of Sri Lanka. The project is supported by the Danish Foreign Ministry. Feasibility studies and detailed design studies were carried out by Lanka Hydraulic Institute Ltd during t...... by LHI (Lanka Hydraulic Institute Ltd), June 2011 describes calculation of erosion and sediment transport under some proposed coastal protection scenario....... the years 1995 to 2003. The design was reviewed by COWI a/s. Construction of the port was started in 2008. MT Højgaard a/s acted as contractor. The outer breakwaters were constructed as first part of the project. During and after completion of the breakwaters a serious beach erosion and sand accumulation...... has been observed. Severe erosion is seen north of the harbour and some accumulation of sand is seen south of the harbour. On a sandy coastline like the one in Oluvil such erosion problems as observed are very typical. The report: Oluvil Port Development Project: Studies on Beach Erosion written...

  17. The rosetta project

    NARCIS (Netherlands)

    Meiland, F.; Leeuw, J. van der; Karkowski, I.; Dröes, R.M.

    2016-01-01

    To support the growing number of community-dwelling persons with dementia, alternative solutions, such as assistive technologies, are needed. In the European Rosetta Project, three separate ICT systems were improved, integrated, and evaluated with the objective to create one modular system that

  18. SELENE project status

    Indian Academy of Sciences (India)

    SELENE (Selenological and Engineering Explorer) project started as a joint mission of the former ISAS (Institute of Space and Astronautical Science) and the former NASDA (National Space Development Agency: the two organizations were merged into JAXA in 2002) of Japan in 1998. The launch target is rescheduled for ...

  19. Space project MIMOSA

    Czech Academy of Sciences Publication Activity Database

    Sehnal, Ladislav

    č. 75 (2003), s. 195-208 ISSN 0373-3742 R&D Projects: GA ČR GV205/96/K119 Institutional research plan: CEZ:AV0Z1003909 Keywords : MIMOSA * microaccelerometer * technical description Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  20. CAFE Project : final report

    NARCIS (Netherlands)

    A. Weber; R. Carter; C.J. Stanford; A. Weber

    2003-01-01

    textabstract[MAS E-0302] This is the final public report of the CAFE project (ESPRIT 7023). CAFE developed a secure conditional access architecture and implemented a multi-currency electronic purse system based on smart cards and infrared wallets. The electronic purse was tested in user trials at

  1. Teacher-Training Projects

    Science.gov (United States)

    Greer, Leslie

    1977-01-01

    The Sociedade Brasileira de Cultura Inglesa of Sao Paolo, Brazil, is an English teaching center which also runs an introductory course to train teachers of English. This article describes some of the projects completed by prospective teachers; they include language games, pictures, cartoons, role-playing and writing creative dialogue. (CHK)

  2. Space Synthetic Biology Project

    Science.gov (United States)

    Howard, David; Roman, Monsi; Mansell, James (Matt)

    2015-01-01

    Synthetic biology is an effort to make genetic engineering more useful by standardizing sections of genetic code. By standardizing genetic components, biological engineering will become much more similar to traditional fields of engineering, in which well-defined components and subsystems are readily available in markets. Specifications of the behavior of those components and subsystems can be used to model a system which incorporates them. Then, the behavior of the novel system can be simulated and optimized. Finally, the components and subsystems can be purchased and assembled to create the optimized system, which most often will exhibit behavior similar to that indicated by the model. The Space Synthetic Biology project began in 2012 as a multi-Center effort. The purpose of this project was to harness Synthetic Biology principals to enable NASA's missions. A central target for application was to Environmental Control & Life Support (ECLS). Engineers from NASA Marshall Space Flight Center's (MSFC's) ECLS Systems Development Branch (ES62) were brought into the project to contribute expertise in operational ECLS systems. Project lead scientists chose to pursue the development of bioelectrochemical technologies to spacecraft life support. Therefore, the ECLS element of the project became essentially an effort to develop a bioelectrochemical ECLS subsystem. Bioelectrochemical systems exploit the ability of many microorganisms to drive their metabolisms by direct or indirect utilization of electrical potential gradients. Whereas many microorganisms are capable of deriving the energy required for the processes of interest (such as carbon dioxide (CO2) fixation) from sunlight, it is believed that subsystems utilizing electrotrophs will exhibit smaller mass, volume, and power requirements than those that derive their energy from sunlight. In the first 2 years of the project, MSFC personnel conducted modeling, simulation, and conceptual design efforts to assist the

  3. Interstate Electrification Improvement Project

    Energy Technology Data Exchange (ETDEWEB)

    Puckette, Margaret [Shorepower Technologies, Hillsboro, OR (United States); Kim, Jeff [Shorepower Technologies, Hillsboro, OR (United States)

    2015-07-01

    The Interstate Electrification Improvement Project, publicly known as the Shorepower Truck Electrification Project (STEP), started in May 2011 and ended in March 2015. The project grant was awarded by the Department of Energy’s Vehicles Technology Office in the amount of $22.2 million. It had three overarching missions: 1. Reduce the idling of Class 8 tractors when parked at truck stops, to reduce diesel fuel consumption and thus U.S. dependence on foreign petroleum; 2. Stimulate job creation and economic activity as part of the American Reinvestment and Recovery Act of 2009; 3. Reduce greenhouse gas emissions (GHG) from diesel combustion and the carbon footprint of the truck transportation industry. The project design was straightforward. First, build fifty Truck Stop Electrification (TSE) facilities in truck stop parking lots across the country so trucks could plug-in to 110V, 220V, or 480VAC, and shut down the engine instead of idling. These facilities were strategically located at fifty truck stops along major U.S. Interstates with heavy truck traffic. Approximately 1,350 connection points were installed, including 150 high-voltage electric standby Transport Refrigeration Unit (eTRU) plugs--eTRUs are capable of plugging in to shore power1 to cool the refrigerated trailer for loads such as produce, meats and ice cream. Second, the project provided financial incentives on idle reduction equipment to 5,000 trucks in the form of rebates, to install equipment compatible with shore power. This equipment enables drivers to shut down the main engine when parked, to heat or cool their cab, charge batteries, or use other household appliances without idling—a common practice that uses approximately 1 gallon of diesel per hour. The rebate recipients were intended to be the first fleets to plug into Shorepower to save diesel fuel and ensure there is significant population of shore power capable trucks. This two part project was designed to complement each other by

  4. The STRATAGEM Project

    Science.gov (United States)

    Evans, D.; Stratagem Partners

    2003-04-01

    STRATAGEM is a 3-year project supported by the European Commission as part of their 5th Framework Programme; it started on 1st March 2000 and is part of the OMARC cluster. STRATAGEM has been taking a very regional approach to the stratigraphical development of the European glaciated margin, studying a large area extending over 18 degrees of latitude from the Porcupine Basin in the south to the Lofoten Islands in the north. The study area spans a range of Pleistocene environments, and includes the southernmost point at which ice sheets will have extended as far as the shelf break. A particularly significant aspect of Plio-Pleistocene sedimentation has been the development of large prograding wedges along the margin. Much of this development is due to downslope processes, but an important aspect that is emerging from the project is the significant contribution of alongslope sediment transport to the sedimentary budget on the margin. The area is also critical for the study of the development of oceanic currents during the later Cenozoic as the gateway through the Faeroe-Shetland Channel and the Rockall Trough evolved. The project has two main deliverables: a stratigraphic atlas and a margin evolution model. The first of these two objectives has been accomplished with the production of an atlas entitled 'The Neogene stratigraphy of the glaciated European margin from Lofoten to Porcupine' (STRATAGEM Partners, 2002). The STRATAGEM stratigraphic atlas places the Neogene sediments in a 'megasequence ' framework that can be consistently applied along the margin. The integrated margin evolution model will provide a context within which other margin studies can be viewed. STRATAGEM is a fine example of Industry-Academia co-operation, for there are close links with the hydrocarbon industry, principally through four Joint Industry Projects active on the north-west European margin, and who have provided data for the project. There are also close links with other OMARC projects

  5. Energy Storage Project

    Science.gov (United States)

    Mercer, Carolyn R.; Jankovsky, Amy L.; Reid, Concha M.; Miller, Thomas B.; Hoberecht, Mark A.

    2011-01-01

    NASA's Exploration Technology Development Program funded the Energy Storage Project to develop battery and fuel cell technology to meet the expected energy storage needs of the Constellation Program for human exploration. Technology needs were determined by architecture studies and risk assessments conducted by the Constellation Program, focused on a mission for a long-duration lunar outpost. Critical energy storage needs were identified as batteries for EVA suits, surface mobility systems, and a lander ascent stage; fuel cells for the lander and mobility systems; and a regenerative fuel cell for surface power. To address these needs, the Energy Storage Project developed advanced lithium-ion battery technology, targeting cell-level safety and very high specific energy and energy density. Key accomplishments include the development of silicon composite anodes, lithiated-mixed-metal-oxide cathodes, low-flammability electrolytes, and cell-incorporated safety devices that promise to substantially improve battery performance while providing a high level of safety. The project also developed "non-flow-through" proton-exchange-membrane fuel cell stacks. The primary advantage of this technology set is the reduction of ancillary parts in the balance-of-plant--fewer pumps, separators and related components should result in fewer failure modes and hence a higher probability of achieving very reliable operation, and reduced parasitic power losses enable smaller reactant tanks and therefore systems with lower mass and volume. Key accomplishments include the fabrication and testing of several robust, small-scale nonflow-through fuel cell stacks that have demonstrated proof-of-concept. This report summarizes the project s goals, objectives, technical accomplishments, and risk assessments. A bibliography spanning the life of the project is also included.

  6. Ceramic Technology Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The Ceramic Technology Project was developed by the USDOE Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS's Materials Development Program, was developed to meet the ceramic technology requirements of the OTS's automotive technology programs. Significant accomplishments in fabricating ceramic components for the USDOE and NASA advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. These programs have also demonstrated that additional research is needed in materials and processing development, design methodology, and data base and life prediction before industry will have a sufficient technology base from which to produce reliable cost-effective ceramic engine components commercially. A five-year project plan was developed with extensive input from private industry. In July 1990 the original plan was updated through the estimated completion of development in 1993. The objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on the structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines. To facilitate the rapid transfer of this technology to US industry, the major portion of the work is being done in the ceramic industry, with technological support from government laboratories, other industrial laboratories, and universities.

  7. Financing wind projects

    International Nuclear Information System (INIS)

    Manson, J.

    2006-01-01

    This presentation reviewed some of the partnership opportunities available from GE Energy. GE Energy's ecomagination commitment has promised to double research investment, make customers true partners and reduce greenhouse gases (GHGs). GE Energy's renewable energy team provides a broad range of financial products, and has recently funded 30 wind farms and 2 large solar projects. The company has a diverse portfolio of technology providers and wind regimes, and is increasing their investment in technology. GE Energy recognizes that the wind industry is growing rapidly and has received increased regulatory support that is backed by strong policy and public support. It is expected that Canada will have 3006 wind projects either planned or under construction by 2007. According to GE Energy, successful wind financing is dependent on the location of the site and its wind resources, as well as on the wind developer's power sales agreement. The success of a wind project is also determined by clear financing goals. Site-specific data is needed to determine the quality of wind resource, and off-site data can also be used to provide validation. Proximity to load centres will help to minimize capital costs. Power sales agreements should be based on the project's realistic net capacity factor as well as on the cost of the turbines. The economics of many wind farms is driven by the size of the turbines used. Public consultations are also needed to ensure the success of wind power projects. It was concluded that a good partner will have staying power in the wind power industry, and will understand the time-lines and needs that are peculiar to wind energy developers. refs., tabs., figs

  8. Preserving the Manhattan Project

    Science.gov (United States)

    Kelly, Cynthia

    2014-03-01

    When future generations look back on the 20th century, few events will rival the harnessing of nuclear energy as a turning point in world history, science and society. Yet, the Department of Energy has not always embraced its Manhattan Project origins. The presentation will focus on the progress made over the last 20 years to preserve the properties and first-hand accounts that for decades have been threatened with demolition and indifference. Since the mid-1950s, most remaining Manhattan Project properties at the Los Alamos National Laboratory had been abandoned. Among them was a cluster of wooden buildings called the ``V Site.'' This is where scientists assembled the ``Gadget,'' the world's first atomic device tested on July 16, 1945. Regardless of its significance, the ``V Site'' buildings like all the rest were slated for demolition. The Advisory Council on Historic Preservation (ACHP) toured the properties in November 1998. Most could not believe that the world's first atomic bomb was designed in such humble structures. The properties were declared to be ``monumental in their lack of monumentality.'' A Save America's Treasures grant for 700,000 was awarded to restore the properties. To raise the required matching funds, I left the Federal government and soon founded the Atomic Heritage Foundation. The presentation will trace the progress made over the last decade to generate interest and support nationwide to preserve the Manhattan Project heritage. Saving both the physical properties and first-hand accounts of the men and women have been a priority. Perhaps our most significant achievement may be legislation now under consideration by Congress to create a Manhattan Project National Historical Park. Seventy years later, the Manhattan Project is finally getting the recognition it deserves.

  9. Kvanefjeld uranium project

    International Nuclear Information System (INIS)

    Erlendsson, G.; Jensen, J.; Kofoed, S.; Paulsen, J.L.

    1983-11-01

    The draft uranium project ''Kvanefjeld'' describes the establishment and operation of an industrial plant for exploiting the uranium deposit at Kvanefjeld. The draft project is part of the overall pre-feasibility project and is based on its results. The draft project includes two alternative locations for the processing plant and the tailings deposit plant. The ore reserve is estimated at 56 million tons with an average content of 365 PPM. The mine will be established as an open pit, with a slope angle of 55deg. Conventional techniques are used in drilling, blasting and handling the ore. Waste rock with no uranium content will be disposed of in two ponds near the mine. The waste rock volume is estimated at 80 million tons. A processing plant for extracting uranium from the ore will be established. The technical layout of the plant is based on the extraction experiments performed at Risoe from 1981-83. Yearly capacity is 4.2 million tons of ore. Electrical energy will be supplied from a hydroelectric station to be built at Johan Dahl Land. Thermal energy (steam/heat) will be supplied from a coal-fired district heating plant to be built in connection with the processing plant. Expected power consumption is estimated at 225 GWh/year. Heat consumption is of the same order. In the third year the plant is expected to operate at full capacity. Operating costs will be Dkr. 121/ton of ore from years 1 through 7. Consumption of chemicals will be reduced from the 7th year, and operating costs will consequently drop to Dkr. 115/ton of ore. Calculations show that industrial extraction of the uranium deposit in Kvanefjeld is economically advantageous. In addition, the economy of the project is expected to improve by extracting byproducts from the ore. (EG)

  10. 2020 Vision Project Summary

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, K.W.; Scott, K.P.

    2000-11-01

    Since the 2020 Vision project began in 1996, students from participating schools have completed and submitted a variety of scenarios describing potential world and regional conditions in the year 2020 and their possible effect on US national security. This report summarizes the students' views and describes trends observed over the course of the 2020 Vision project's five years. It also highlights the main organizational features of the project. An analysis of thematic trends among the scenarios showed interesting shifts in students' thinking, particularly in their views of computer technology, US relations with China, and globalization. In 1996, most students perceived computer technology as highly beneficial to society, but as the year 2000 approached, this technology was viewed with fear and suspicion, even personified as a malicious, uncontrollable being. Yet, after New Year's passed with little disruption, students generally again perceived computer technology as beneficial. Also in 1996, students tended to see US relations with China as potentially positive, with economic interaction proving favorable to both countries. By 2000, this view had transformed into a perception of China emerging as the US' main rival and ''enemy'' in the global geopolitical realm. Regarding globalization, students in the first two years of the project tended to perceive world events as dependent on US action. However, by the end of the project, they saw the US as having little control over world events and therefore, we Americans would need to cooperate and compromise with other nations in order to maintain our own well-being.

  11. Methodological Aspects of Project Techniques Selection for Innovation Project Management

    Directory of Open Access Journals (Sweden)

    Anna Yakovleva

    2014-06-01

    Full Text Available Project Management offers a variety of methodologies which provides managers with different techniques and tools to use during project planning and implementation. At the same time there is a substantial lack of systematized approaches to the management of innovation projects. In this article key factors in the selection of appropriate techniques in innovation project management will first be identified. Theoretical analysis of different project management standards and possibility of their use will then be discussed. In addition how the techniques can be applied will be investigated through academic paper analysis. . This research makes a theoretical contribution to the field of project management by selecting and determining which project management techniques can be adapted and applied to innovation projects. Recommendations for practical application are based on theoretical findings of the research. These include two main factors, which are: influencing the choice of project management techniques and the structure of project selection process. The significance of the results obtained is confirmed by creation of theoretical knowledge, which permits to thoroughly understand and capture issues which may emerge during innovation project planning and implementation, through the use of established project management methodology. Keywords: Project management, Innovation, Project management standard, innovation project, PMBoK, PRINCE2, ICB.

  12. Great Basin paleoenvironmental studies project

    International Nuclear Information System (INIS)

    1993-01-01

    Project goals, project tasks, progress on tasks, and problems encountered are described and discussed for each of the studies that make up the Great Basin Paleoenvironmental Studies Project for Yucca Mountain. These studies are: Paleobotany, Paleofauna, Geomorphology, and Transportation. Budget summaries are also given for each of the studies and for the overall project

  13. Important projects of the Division

    International Nuclear Information System (INIS)

    2008-01-01

    In this chapter important projects of the Division for Radiation Safety, NPP Decommissioning and Radwaste Management of the VUJE, a. s. are presented. Division for Radiation Safety, NPP Decommissioning and Radwaste Management has successfully carried out variety of significant projects. The most significant projects that were realised, are implemented and possible future projects are introduced in the following part of presentation.

  14. Project management in health informatics.

    Science.gov (United States)

    Ho, Jessica

    2010-01-01

    This chapter gives an educational overview of: * the concept of project management and its role in modern management * the generic project lifecycle process * processes used in developing a plan for the management of resources - time, cost, physical resources and people * the concept of managing risk in projects * communication processes and practices that are important to the management of projects.

  15. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  16. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce....... Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure...... upcoming evaluations by highlighting beneficial aspects and/or revealing hidden issues, the aim of this paper is to contribute to the theoretical and practical field of project management. The paper contributes to project theory and practice by inspiring project researchers and aiding project workers...

  17. Artificial Gravity Research Project

    Science.gov (United States)

    Kamman, Michelle R.; Paloski, William H.

    2005-01-01

    Protecting the health, safety, and performance of exploration-class mission crews against the physiological deconditioning resulting from long-term weightlessness during transit and long-term hypogravity during surface operations will require effective, multi-system countermeasures. Artificial gravity (AG), which would replace terrestrial gravity with inertial forces generated by rotating the transit vehicle or by a human centrifuge device within the transit vehicle or surface habitat, has long been considered a potential solution. However, despite its attractiveness as an efficient, multi-system countermeasure and its potential for improving the environment and simplifying operational activities (e.g., WCS, galley, etc.), much still needs to be learned regarding the human response to rotating environments before AG can be successfully implemented. This paper will describe our approach for developing and implementing a rigorous AG Research Project to address the key biomedical research questions that must be answered before developing effective AG countermeasure implementation strategies for exploration-class missions. The AG Research Project will be performed at JSC, ARC, extramural academic and government research venues, and international partner facilities maintained by DLR and IMBP. The Project includes three major ground-based human research subprojects that will lead to flight testing of intermittent short-radius AG in ISS crewmembers after 201 0, continuous long-radius AG in CEV crews transiting to and from the Moon, and intermittent short-radius AG plus exercise in lunar habitats. These human ground-based subprojects include: 1) a directed, managed international short-radius project to investigate the multi-system effectiveness of intermittent AG in human subjects deconditioned by bed rest, 2) a directed, managed long-radius project to investigate the capacity of humans to live and work for extended periods in rotating environments, and 3) a focused

  18. Measurement of Software Project Management Effectiveness

    National Research Council Canada - National Science Library

    Demir, Kadir A

    2008-01-01

    .... The metric may be used to evaluate and monitor project management effectiveness in software projects by project managers, technical managers, executive managers, project team leaders and various...

  19. Value Perspective of Project Stakeholders

    Science.gov (United States)

    Cekic, Z.; Surlan, N.; Kosic, T.

    2017-11-01

    When starting a construction project, one assumes, mostly through experience, what is the value the project will bring to investors, consultants, contractors and other stakeholders. However, the value of the project greatly depends on the perspective of the observer and which stakeholder is considering it. So, how is value perceived on the construction project? The purpose of this research is to obtain construction project value parameters utilizing the Delphi technique.

  20. Beginning analog electronics through projects

    CERN Document Server

    Singmin, Andrew

    2001-01-01

    Analog electronics is the simplest way to start a fun, informative, learning program. Beginning Analog Electronics Through Projects, Second Edition was written with the needs of beginning hobbyists and students in mind. This revision of Andrew Singmin's popular Beginning Electronics Through Projects provides practical exercises, building techniques, and ideas for useful electronics projects. Additionally, it features new material on analog and digital electronics, and new projects for troubleshooting test equipment.Published in the tradition of Beginning Electronics Through Projects an

  1. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  2. Experiences of project developers around CDM projects in South Africa

    International Nuclear Information System (INIS)

    Thurner, Thomas W.; Varughese, Arun

    2013-01-01

    Project developers in South Africa are puzzled with the long process of evaluating and registering their CDM projects. In addition to other obstacles, we find that South African big businesses are rather reluctant to engage in any new business activities such as CDM projects and municipalities often lack the necessary flexibility. This offers opportunities for small-scale project developers who spot the opportunities and find creative solutions to overcome these difficulties. - Highlights: • First paper analysing the experience of small project developers in South Africa. • Project developers in South Africa are puzzled with the long process. • South African big businesses are reluctant to engage in CDM projects. • Small-scale project developers spot opportunities and find creative solutions to overcome difficulties. • Also, we saw learning processes of South African administration in support of CDM projects

  3. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families...... with closely related topics, group supervision in lab and weekly group meetings combined with individual supervision. The overall topic of all student projects was “Use of alternative ashes in concrete” and they were experimentally based. A key challenge in this organization of projects is on one hand to offer...... and professional skills and attributes were developed. They learned time and resource management, used engineering reasoning, took initiatives and were willing to take risks. This can also be met through solely individual projects, but in addition the organization of project families strongly supported development...

  4. Exe-Guard Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Lab., Inc., Pullman, WA (United States); Marshall, Tim [Dominion Virginia Power, Richmond, VA (United States); Chavez, Adrian [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Bratus, Sergey [Dartmouth College, Hanover, NH (United States)

    2016-01-30

    The exe-Guard Project is an alliance between Dominion Virginia Power (DVP), Sandia National Laboratories (SNL), Dartmouth University, and Schweitzer Engineering Laboratories (SEL). SEL is primary recipient on this project. The exe-Guard project was selected for award under DE-FOA-0000359 with CFDA number 81.122 to address Topic Area of Interest 4: Hardened platforms and Systems. The exe-Guard project developed an antivirus solution for control system embedded devices to prevent the execution of unauthorized code and maintain settings and configuration integrity. This project created a white list antivirus solution for control systems capable of running on embedded Linux® operating systems. White list antivirus methods allow only credible programs to run through the use of digital signatures and hash functions. Once a system’s secure state is baselined, white list antivirus software denies deviations from that state because of the installation of malicious code as this changes hash results. Black list antivirus software has been effective in traditional IT environments but has negative implications for control systems. Black list antivirus uses pattern matching and behavioral analysis to identify system threats while relying on regular updates to the signature file and recurrent system scanning. Black list antivirus is vulnerable to zero day exploits which have not yet been incorporated into a signature file update. System scans hamper the performance of high availability applications, as revealed in NIST special publication 1058 which summarizes the impact of blacklist antivirus on control systems: Manual or “on-demand” scanning has a major effect on control processes in that they take CPU time needed by the control process (Sometimes close to 100% of CPU time). Minimizing the antivirus software throttle setting will reduce but not eliminate this effect. Signature updates can also take up to 100% of CPU time, but for a much shorter period than a typical

  5. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Science.gov (United States)

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  6. Pilot project as enabler?

    DEFF Research Database (Denmark)

    Neisig, Margit; Glimø, Helle; Holm, Catrine Granzow

    pilot projects as enabler of transition. Aspects of how to create trust and deal with distrust during a transition are addressed. The transition in focus is the concept of New Public Management and how it is applied in the management of the Employment Service in Denmark. The transition regards......This article deals with a systemic perspective on transition. The field of study addressed is a pilot project as enabler of transition in a highly complex polycentric context. From a Luhmannian systemic approach, a framework is created to understand and address barriers of change occurred using...... the systemic change from a very control based and detailed regulated version of New Public Management towards a system allowing more flexibility and decentralized decision making empowering municipalities as well as employees own decision making...

  7. Uncertainty in oil projects

    International Nuclear Information System (INIS)

    Limperopoulos, G.J.

    1995-01-01

    This report presents an oil project valuation under uncertainty by means of two well-known financial techniques: The Capital Asset Pricing Model (CAPM) and The Black-Scholes Option Pricing Formula. CAPM gives a linear positive relationship between expected rate of return and risk but does not take into consideration the aspect of flexibility which is crucial for an irreversible investment as an oil price is. Introduction of investment decision flexibility by using real options can increase the oil project value substantially. Some simple tests for the importance of uncertainty in stock market for oil investments are performed. Uncertainty in stock returns is correlated with aggregate product market uncertainty according to Pindyck (1991). The results of the tests are not satisfactory due to the short data series but introducing two other explanatory variables the interest rate and Gross Domestic Product make the situation better. 36 refs., 18 figs., 6 tabs

  8. Moisture Metrics Project

    Energy Technology Data Exchange (ETDEWEB)

    Schuchmann, Mark

    2011-08-31

    the goal of this project was to determine the optimum moisture levels for biomass processing for pellets commercially, by correlating data taken from numerous points in the process, and across several different feedstock materials produced and harvested using a variety of different management practices. This was to be done by correlating energy consumption and material through put rates with the moisture content of incoming biomass ( corn & wheat stubble, native grasses, weeds, & grass straws), and the quality of the final pellet product.This project disseminated the data through a public website, and answering questions form universities across Missouri that are engaged in biomass conversion technologies. Student interns from a local university were employed to help collect data, which enabled them to learn firsthand about biomass processing.

  9. [Healthy Cities projects].

    Science.gov (United States)

    Takano, Takehito

    2002-05-01

    This is a review article on "Healthy Cities". The Healthy Cities programme has been developed by the World Health Organization (WHO) to tackle urban health and environmental issues in a broad way. It is a kind of comprehensive policy package to carry out individual projects and activities effectively and efficiently. Its key aspects include healthy public policy, vision sharing, high political commitment, establishment of structural organization, strategic health planning, intersectoral collaboration, community participation, setting approach, development of supportive environment for health, formation of city health profile, national and international networking, participatory research, periodic monitoring and evaluation, and mechanisms for sustainability of projects. The present paper covered the Healthy Cities concept and approaches, rapid urbanization in the world, developments of WHO Healthy Cities, Healthy Cities developments in the Western Pacific Region, the health promotion viewpoint, and roles of research.

  10. Fermilab Library projects

    Energy Technology Data Exchange (ETDEWEB)

    Garrett, P.; Ritchie, D.

    1990-05-03

    Preprint database management as done at various centers -- the subject of this workshop -- is hard to separate from the overall activities of the particular center. We therefore present the wider context at the Fermilab Library into which preprint database management fits. The day-to-day activities of the Library aside, the dominant activity at present is that of the ongoing Fermilab Library Automation. A less dominant but relatively time-consuming activity is that of doing more online searches in commercial databases on behalf of laboratory staff and visitors. A related activity is that of exploring the benefits of end-user searching of similar sources as opposed to library staff searching of the same. The Library Automation Project, which began about two years ago, is about to go fully online.'' The rationale behind this project is described in the documents developed during the December 1988--February 1989 planning phase.

  11. Debt collection project report

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    In October 1979 the Office of Management and Budget initiated a review of debt collection within the Federal Government. A DOE Debt Collection Project Team was established, and seven activites were selected for review. These were Albuquerque Operations Office; Bonneville Power Administration; Chicago Operations and Regional Office; Naval Petroleum Reserves, California; Oak Ridge Operations Office; Washington Financial Services Division; and Western Area Power Administration. The team visited each of these activities to collect data on the size, age, and types of receivables managed and procedures for billing, aging, and handling overdue accounts. Various deficiencies were found to exist at several of the DOE entities that are not consistent with good management practices in the performance of their debt collection functions. Also, the Debt Collection Project Team identified a wide variation in the procedures followed by DOE activities in the management of accounts receivable, and a wide variation in the effectiveness of the debt management functions. 1 figure, 17 tables. (RWR)

  12. Sapucai River Project

    International Nuclear Information System (INIS)

    Duarte, A.L.; Rosa, M.J.

    1988-01-01

    The Sapucai River Project is a gold, ilmenite, monazite and zircon alluvial deposit. It is located on Sapucai River valley in the south of Minas Gerais State. The reserves are 28.000.000 m 3 of pay bed. The production will be 1.400.000 m 3 /year and the mine's life 20 years. A cutterhead suction dredge will do the overburden removal. The pay bed will be mined with an underwater bucket-wheel dredge. The ROM will be concentrated in a washing plant. The gold will be recovered by leaching method. The other heavy minerals will be recovered by electrostatic, magnetic and gravitic methods. SAMITRI believes that it's possible to implant and operate the Project without ecological damage. (author) [pt

  13. Appraisal of Transport Projects

    DEFF Research Database (Denmark)

    Jensen, Anders Vestergaard

    The evaluation of transport projects has traditionally been based on quantitative descriptions of selected impacts by the use of cost-benefit analysis (CBA). However, environmental impacts are now taking into consideration when decisions have to be made, regarding which large transport projects...... be dealt with by the use of sensitivity analysis and robustness measures. This also calls for an appraisal methodology which is transparent and able to include the different preferences among experts, the public, and stakeholders. This PhD thesis has three main focuses concerning appraisal of transport...... papers written during the PhD study. The potential for transport appraisal demonstrated in this PhD study can be listed in the following main findings. • To reconcile socio-economic analysis and public acceptance it can be recommended to widen the appraisal methodology. • When widening the appraisal...

  14. Shippingport: Overall project progress

    International Nuclear Information System (INIS)

    Crimi, F.P.

    1989-01-01

    The Shippingport atomic power station (SAPS) consisted of the nuclear steam supply system and associated radioactive waste processing systems, which were owned by the US Department of Energy (DOE), and the balance of plant, owned by the Duquesne Light Company. The station is located at Shippingport, Pennsylvania, on 7 acres of land leased by DOE from Duquesne Light Company. The Shippingport Station Decommissioning Project (SSDP) is being performed under contract to the DOE by the General Electric Company (GE) and its preselected subcontractor, MK-Ferguson Company, as the decommissioning operations contractor (DOC). This paper describes the decommissioning work that has been accomplished since July 1988, and the project's cost and schedule status. As the first decommissioning of a commercial, full-scale nuclear power plant, the SSDP is expected to set the standards for the demolition of future nuclear power plants

  15. Design Theory Projectability

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Baskerville, Richard

    2014-01-01

    design science research is materially prescriptive, it requires a different perspective in developing the breadth of applications of design theories. In this paper we propose different concepts that embody forms of general technological knowledge The concept of projectability, developed originally...... as a means of distinguishing realized generalizations from unrealized generalizations, helps explain how design theories, being prescriptive, possess a different form of applicability. The concept of entrenchment describes the use of a theory in many projections. Together these concepts provide a means......Technological knowledge has been characterized as having a scope that is specific to a particular problem. However, the information systems community is exploring forms of design science research that provide a promising avenue to technological knowledge with broader scope: design theories. Because...

  16. The random projection method

    CERN Document Server

    Vempala, Santosh S

    2005-01-01

    Random projection is a simple geometric technique for reducing the dimensionality of a set of points in Euclidean space while preserving pairwise distances approximately. The technique plays a key role in several breakthrough developments in the field of algorithms. In other cases, it provides elegant alternative proofs. The book begins with an elementary description of the technique and its basic properties. Then it develops the method in the context of applications, which are divided into three groups. The first group consists of combinatorial optimization problems such as maxcut, graph coloring, minimum multicut, graph bandwidth and VLSI layout. Presented in this context is the theory of Euclidean embeddings of graphs. The next group is machine learning problems, specifically, learning intersections of halfspaces and learning large margin hypotheses. The projection method is further refined for the latter application. The last set consists of problems inspired by information retrieval, namely, nearest neig...

  17. The projective heat map

    CERN Document Server

    Schwartz, Richard Evan

    2017-01-01

    This book introduces a simple dynamical model for a planar heat map that is invariant under projective transformations. The map is defined by iterating a polygon map, where one starts with a finite planar N-gon and produces a new N-gon by a prescribed geometric construction. One of the appeals of the topic of this book is the simplicity of the construction that yet leads to deep and far reaching mathematics. To construct the projective heat map, the author modifies the classical affine invariant midpoint map, which takes a polygon to a new polygon whose vertices are the midpoints of the original. The author provides useful background which makes this book accessible to a beginning graduate student or advanced undergraduate as well as researchers approaching this subject from other fields of specialty. The book includes many illustrations, and there is also a companion computer program.

  18. The MPPC project

    International Nuclear Information System (INIS)

    Rohrbach, F.

    1993-01-01

    We report on the work done in massively parallel processing with a view to studying possible solutions for extracting interesting high-energy physics particle events at future high-luminosity hadronic colliders operating in the TeV energy domain. We concentrate on a special Single Instruction Multiple Data (SIMD) architecture: the Associative String Processor (ASP). The Massively Parallel Processing Collaboration (MPPC) Project, grouping nine European institutes, was launched by CERN to carry out this RandD programme. This report, written by partners of the MPPC collaboration, describes the main results achieved at the end of the project: construction of ASP machines, parallel software development and application studies in high-energy physics and in other fields of science. A final, positive assessment of the ASP concept has been made by the Collaboration. (orig.)

  19. Sniffer project development

    CERN Document Server

    Grau, S; CERN. Geneva. ST Division

    2002-01-01

    To ensure the safety of the personnel, and prevent major damage to the equipment in the LHC experiments, a combined fire and gas detection system is being developed in conjunction with the industry. This system named SNIFFER, shall detect fire, flammable gas leaks and oxygen deficiency. In addition it shall interface with the Experiments' Control System and the CERN Safety Alarm Monitoring system. The SNIFFER project is currently at the end of the prototyping phase, and the technical specification is being written for the outsourcing of the system. The purpose of this document is to describe the main functions, constraints and interfaces of the system, to present the status report and planning of the project, and to explain the preliminary conclusions of the prototyping phase.

  20. Creatvity in Project Work

    DEFF Research Database (Denmark)

    Bjørner, Thomas; Kofoed, Lise B.; Bruun-Pedersen, Jon Ram

    2012-01-01

    is to answer the following: What is the Medialogy students’ perception of creativity and in which part of the process of problem solving do they view themselves as being creative? In Medialogy, the education explicitly focuses on the little-c creativity and communicates the everyday life and evolutionary...... creativity to the students. The Medialogy students also perceive creativity as the little-c creativity that contains something interpersonal and intrapersonal, and by means of which products can be developed. They do not regard creativity as focusing on interaction and social context. They perceive...... that they are creative during all stages in the project work. However, it is also significant that the Medialogy students believe that they are more creative in the beginning of their projects and during the design and implementation stages, whereas the analysis is a less creative part. In general, the Medialogy...

  1. Projecte WebSat

    OpenAIRE

    Pascual Aventí, Guillem

    2004-01-01

    El marc d'aquest projecte és el servei d' atenció tècnica d'un dels distribuïdors d'una coneguda marca d'ofimàtica i electrònica domèstica. Un dels processos de negoci consisteix en la reparació d'aquesta mena d'equips. El marco del proyecto es el servicio de atención técnica de uno de los distribuidores de una conocida marca de ofimática y electrónica doméstica. Uno de los procesos de negocio consiste en la reparación de este tipo de equipos. The framework of this project is the techni...

  2. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Small, R. Justin [Woods Hole Oceanographic Institution, MA (United States); Bryan, Frank [Woods Hole Oceanographic Institution, MA (United States); Tribbia, Joseph [Woods Hole Oceanographic Institution, MA (United States); Park, Sungsu [Woods Hole Oceanographic Institution, MA (United States); Dennis, John [Woods Hole Oceanographic Institution, MA (United States); Saravanan, R. [Woods Hole Oceanographic Institution, MA (United States); Schneider, Niklas [Woods Hole Oceanographic Institution, MA (United States); Kwon, Young-Oh [Woods Hole Oceanographic Institution, MA (United States)

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  3. Hyperbolicity of projective hypersurfaces

    CERN Document Server

    Diverio, Simone

    2016-01-01

    This book presents recent advances on Kobayashi hyperbolicity in complex geometry, especially in connection with projective hypersurfaces. This is a very active field, not least because of the fascinating relations with complex algebraic and arithmetic geometry. Foundational works of Serge Lang and Paul A. Vojta, among others, resulted in precise conjectures regarding the interplay of these research fields (e.g. existence of Zariski dense entire curves should correspond to the (potential) density of rational points). Perhaps one of the conjectures which generated most activity in Kobayashi hyperbolicity theory is the one formed by Kobayashi himself in 1970 which predicts that a very general projective hypersurface of degree large enough does not contain any (non-constant) entire curves. Since the seminal work of Green and Griffiths in 1979, later refined by J.-P. Demailly, J. Noguchi, Y.-T. Siu and others, it became clear that a possible general strategy to attack this problem was to look at particular algebr...

  4. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The Shippingport Atomic Power Station was located on the Ohio River in Shippingport Borough (Beaver County), Pennsylvania, USA. The US Atomic Energy Commission (AEC) constructed the plant in the mid-1950s on a seven and half acre parcel of land leased from Duquesne Light Company (DLC). The purposes were to demonstrate and to develop Pressurized Water Recovery technology and to generate electricity. DLC operated the Shippingport plant under supervision of (the successor to AEC) the Department of Energy (DOE)-Naval Reactors (NR) until operations were terminated on October 1, 1982. NR concluded end-of-life testing and defueling in 1984 and transferred the Station's responsibility to DOE Richland Operations Office (RL), Surplus Facility Management Program Office (SFMPO5) on September 5, 1984. SFMPO subsequently established the Shippingport Station Decommissioning Project and selected General Electric (GE) as the Decommissioning Operations Contractor. This report is intended to provide an overview of the Shippingport Station Decommissioning Project

  5. Halden reactor project

    International Nuclear Information System (INIS)

    1980-01-01

    The research programme at the Halden Project is focused on the following three areas: 1. In-core behavior of reactor fuel, particularly reliability and safety aspects, which is studied through irradiation of test fuel elements. 2. Prediction, surveillance and control of fuel and core performance for which models of fuel and core behavior are developed. 3. Applications of process computers to power plant control, for which prototype software systems and hardware arrangements are developed

  6. The Quixote Project

    OpenAIRE

    Adams, Sam; Beke, Tamas; Echenique, Pablo; Estrada, Jorge; Hanwell, Marcus D; Murray-Rust, Peter; Thomas, Jens; Townsend, Joseph A; Westerhoff, Lance

    2011-01-01

    Poster presented at the VSMF Symposium held at the Unilever Centre on 2011-01-17 The Quixote Project is an Open Source, Open Data, international collaboration to develop the infrastructure to organise, share and query computational chemistry data; no centralised structure, internet-based and run entirely by motivated scientists; create a useful infrastructure and consolidate the model around the tools (the "if you build it, they will come" approach); collaboration managed using skype confe...

  7. Nuclear safety project

    International Nuclear Information System (INIS)

    Anon.

    1980-11-01

    The 17th semi-annual report 1980/1 is a description of work within the Nuclear Safety Project performed in the first six months of 1980 in the nuclear safety field by KfK institutes and departments and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics - work performed, results obtained, plans for future work. (orig.) [de

  8. Project management tool

    Science.gov (United States)

    Maluf, David A. (Inventor); Gawdiak, Yuri O. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  9. The plagiarism project.

    Science.gov (United States)

    Glassman, Nancy R; Sorensen, Karen; Habousha, Racheline G; Minuti, Aurelia; Schwartz, Rachel

    2011-01-01

    Plagiarism has been a problem plaguing academia for centuries. The Internet has made it easier than ever to copy material from one electronic document and paste it into another. Many cases are unintentional, as writers are unaware of the rules regarding plagiarism. This paper provides an overview of plagiarism and describes a project in which librarians partnered with the assistant dean of a graduate science program to educate students about the perils of plagiarism and encourage ethical writing practices.

  10. The SAVEMEDCOASTS Project

    Science.gov (United States)

    Anzidei, Marco; Patias, Petros; Forlenza, Giovanna; Trivigno, Maria Lucia; Michetti, Melania; Torresan, Silvia; Loizidou, Xenia; Petousis, Thanos; Doumaz, Fawzi; Lorito, Stefano; Brunori, Carlo Alberto; Pesci, Arianna; Carmisciano, Cosmo

    2017-04-01

    The SAVEMEDCOASTS Project (Sea Level Rise Scenarios along the Mediterranean Coasts), focuses on the Prevention Priority program of the European Commission ECHO A.5 "Civil protection policy, Prevention, Preparedness and Disaster Risk Reduction" and aims to respond to the need for people and assets prevention from natural disasters in Mediterranean coastal areas undergoing to increasing sea level rise and climate change impacts. The goals of the project are: i) to support civil protection at different levels and with different tools and methods to produce exhaustive risk assessments for different periods; ii) to improve governance and raise community awareness towards the impacts of sea level rise and related hazard; iii) to foster the cooperation amongst science, affected communities and civil protection organizations within and between targeted Mediterranean areas. Advanced methods are implied to develop multi-hazard assessments and existing databases for low-lying coastal areas already below or at less than 1 m above sea level, characterized by high economic and environmental value. The effects of sea level rise are assessed by mapping the multi-temporal scenarios of the inland extension of marine flooding and coastline position up to 2100, also temporarily increased during storms or tsunamis. They will result from i) the best available high resolution Digital Terrain Models (DTM); ii) known rates of land subsidence and iii) local sea level rise estimates. Finally, information is transferred to society, policy makers and stakeholders through an open web platform populated with collected information, videos and photo galleries, project results and guidelines. Here we show the strategy and goals of the SAVEMEDCOASTS Project.

  11. Medical Entomology Project.

    Science.gov (United States)

    1980-01-01

    Microculex) sp., Limatus op., Psorophora (Psrophora) sp., Ps. (Janthinosoma) sp., Sabethes sp. and Toxorhynchites op. WM 13 b. Africa Dr. Yiau-Min Huang will...subspecies of modestus. Toxorhynchites ( Toxorhynchites ) yamadai and Tx. (Tox.) yaeyamae are reduced to subspecies of manicatus. New taxa are as follows...references on Toxorhynchites were furnished to Dr. W. A. Steffan. Dr. Steffan also visited the project for a few days during the summer and made copies of many

  12. Nucleus: A pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Finnell, Joshua Eugene [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Klein, Martin [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Cain, Brian J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-09

    The proposal is to provide institutional infrastructure that facilitates management of research projects, research collaboration, and management, preservation, and discovery of data. Deploying such infrastructure will amplify the effectiveness, efficiency, and impact of research, as well as assist researchers in regards to compliance with both data management mandates and LANL security policy. This will facilitate discoverability of LANL research both within the lab and external to LANL.

  13. Uranium project. Geochemistry prospection

    International Nuclear Information System (INIS)

    Lambert, J.

    1983-01-01

    Geochemistry studies the distribution of the chemicals elements in the terrestrial crust and its ways to migrate. The terminology used in this report is the following one: 1) Principles of the prospection geochemistry 2) Stages of the prospection geochemistry 3)utility of the prospection geochemistry 4) geochemistry of uranium 5) procedures used within the framework of uranium project 6) Average available 7) Selection of the zones of prospection geochemistry 8) Stages of the prospection, Sample preparation and analisis 9) Presentation of the results

  14. The MARNA project

    International Nuclear Information System (INIS)

    Suarez Mahou, E.; Fernandez Amigot, J.A.

    1997-01-01

    The MARNA Project is developed within the framework of an agreement established between the Spanish Nuclear Safety Council (CSN) and ENUSA. It consists of two phases, of which the first one has already been concluded successfully in December 1995. The final objective of the first phase of the project was the elaboration of the Natural Gamma Radiation Map of Spain on a scale of 1:1,000,000. For the preparation of this map radiometric data were generated during the thirty years the old National Uranium Exploration and Investigation Plan (PNEIU), mainly through airborne, car-borne and by foot surveys and those generated within the MARNA Project. Previously, four pilot maps on the scale of 1:50,000 had been prepared for four radiometric zones of special interest. The total surface of these four zones add up to about 2500 km 2 and 10,000 radiometric data which were used in the elaboration of the maps. Further were prepared on the scale of 1:200,000: the radiometric Atlas of the Autonomous Communities of Extremadura and Castilla-Leon which covers an area of 130,000 km 2 . The radiometric data extracted plus the generated applicable to such a surface add up to 120,000. This large data base has permitted to verify important quality controls in the technologies of data extraction and the elaboration of maps on various scales. The goal of the second phase, initiated in January 1996, is to complete the National Radiometric Atlas on the scale of 1:200,000 of a similar quality as the one obtained in Extremadura and Castilla-Leon and also to improve the Map 1:1,000,000. In this paper, the characteristics and more relevant results of the MARNA Project at the end of its first phase are presented. (author)

  15. The Microchip Optera Project

    Science.gov (United States)

    2006-01-01

    RESEARCHBRIEF T H E I N S T I T U T E F O R S Y S T E M S R E S E A R C H The Microchip Optera Project The potential Bats use sonar to fly...OMB control number. 1. REPORT DATE 2006 2. REPORT TYPE 3. DATES COVERED 00-00-2006 to 00-00-2006 4. TITLE AND SUBTITLE The Microchip Optera

  16. Map Projections in Wikipedia

    Directory of Open Access Journals (Sweden)

    Nedjeljko Frančula

    2009-12-01

    Full Text Available Wikipedia (wiki + encyclopaedia is a multilingual, web-based encyclopaedia with free content. It is a wiki, which means it is written by numerous volunteers, and most articles can be changed by anyone with Internet access and an adequate web browser. The project was started on January 15, 2001. Wikipedia currently has more than 3 700 000 articles in many languages (including a million articles in English.

  17. Renewable energy project development

    Energy Technology Data Exchange (ETDEWEB)

    Ohi, J.

    1996-12-31

    The author presents this paper with three main thrusts. The first is to discuss the implementation of renewable energy options in China, the second is to identify the key project development steps necessary to implement such programs, and finally is to develop recommendations in the form of key issues which must be addressed in developing such a program, and key technical assistance needs which must be addressed to make such a program practical.

  18. OECD Halden reactor project

    International Nuclear Information System (INIS)

    1978-01-01

    This report summarizes the activities of the OECD Halden Reactor Project for the year 1976. The main items reported on are: a) the process supervision and control which have focused on core monitoring and control, and operator-process communication; b) the fuel performance and safety behavior which have provided data and analytical descriptions of the thermal, mechanical and chemical behavior of fuel under various operating conditions; c) the reactor operations and d) the administration and finance

  19. The LISS project

    International Nuclear Information System (INIS)

    Vigdor, S.E.

    1996-01-01

    A storage ring with internal targets offers a novel, cost-effective and very well-suited environment for pursuing experiments with multi-GeV polarized light-ion beams. The Indiana University Cyclotron Facility is in the late stages of preparing a funding proposal for such a synchrotron/storage ring, called LISS. I review the status, the extensive technical advantages, and the projected physics program of LISS. (orig.)

  20. Pocos de Caldas Project

    International Nuclear Information System (INIS)

    1989-01-01

    The second annual report of the Pocos de Caldas Project describes the results of the first phase of the post-feasibility study investigations. Boreholes have been drilled at two sites, the Osamu Utsumi uranium mine and Morro do Ferro, and rock and groundwater samples analysed to provide data on natural analogues of radionuclide migration processes. These detailed geochemical analysis and hydrogeological studies are described, and related to four specific objectives concerning issues of importance in repository performance assessment. (author)

  1. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  2. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  3. Project winners - Ademe

    International Nuclear Information System (INIS)

    2015-01-01

    The French agency of environment and energy management (Ademe) is the operator in charge of innovation for accelerating the ecological and environmental transition. A credit of 3.3 billion euros is allocated to this goal in the framework of forward-looking investment. This budget aims at financing innovative projects of any size with the objective of developing tomorrow's industries. The projects cover the following topics: 1 - carbon-free energies and green chemistry: renewable energy sources (marine, solar, wind and geothermal energies), green chemistry and energy challenges (bio-resources, buildings, energy storage, hydrogen, CO 2 capture, storage and valorization, industry and agriculture), 2 - smart grids, 3 - circular economy (wastes and industrial ecology, sites and soils cleansing, water and biodiversity), 4 - future vehicles: road vehicle (mobility and logistics, electric-powered vehicles and charging facilities, hybrid and thermal engines, vehicles lightering, heavy-duty vehicles), rail and maritime transport. This document presents the financing system, a report of the previous investment campaign (2014), and the list of retained projects for the 2015 investment program

  4. OCGen Module Mooring Project

    Energy Technology Data Exchange (ETDEWEB)

    McEntee, Jarlath [Ocean Renewable Power Company, LLC, Portland, ME (United States)

    2015-02-06

    Ocean Renewable Power Company's OCGen Module Mooring Project provided an extensive research, design, development, testing and data collection effort and analysis conducted with respect to a positively buoyant, submerged MHK device secured to the seabed using a tensioned mooring system. Different analytic tools were evaluated for their utility in the design of submerged systems and their moorings. Deployment and testing of a prototype OCGen® system provided significant data related to mooring line loads and system attitude and station keeping. Mooring line loads were measured in situ and reported against flow speeds. The Project made a significant step in the development of designs, methodologies and practices related to floating and mooring of marine hydrokinetic (MHK) devices. Importantly for Ocean Renewable Power Company, the Project provided a sound basis for advancing a technically and commercially viable OCGen® Power System. The OCGen® Power System is unique in the MHK industry and, in itself, offers distinct advantages of MHK devices that are secured to the seabed using fixed structural frames. Foremost among these advantages are capital and operating cost reductions and increased power extraction by allowing the device to be placed at the most energetic level of the water column.

  5. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  6. Commuting projections on graphs

    Energy Technology Data Exchange (ETDEWEB)

    Vassilevski, Panayot S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States). Center for Applied Scientific Computing; Zikatanov, Ludmil T. [Pennsylvania State Univ., University Park, PA (United States). Dept. of Mathematics

    2013-02-19

    For a given (connected) graph, we consider vector spaces of (discrete) functions defined on its vertices and its edges. These two spaces are related by a discrete gradient operator, Grad and its adjoint, ₋Div, referred to as (negative) discrete divergence. We also consider a coarse graph obtained by aggregation of vertices of the original one. Then a coarse vertex space is identified with the subspace of piecewise constant functions over the aggregates. We consider the ℓ2-projection QH onto the space of these piecewise constants. In the present paper, our main result is the construction of a projection π H from the original edge-space onto a properly constructed coarse edge-space associated with the edges of the coarse graph. The projections π H and QH commute with the discrete divergence operator, i.e., we have div π H = QH div. The respective pair of coarse edge-space and coarse vertexspace offer the potential to construct two-level, and by recursion, multilevel methods for the mixed formulation of the graph Laplacian which utilizes the discrete divergence operator. The performance of one two-level method with overlapping Schwarz smoothing and correction based on the constructed coarse spaces for solving such mixed graph Laplacian systems is illustrated on a number of graph examples.

  7. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Bogucz, E A

    2010-12-13

    This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for “intelligent nested environmental systems technologies (iNEST),” which monitor and control energy flows and IEQ across a cascade of spaces from individuals’ desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoE’s Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuse’s Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoE’s website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

  8. Transdisciplinary Planning Project Learning

    Directory of Open Access Journals (Sweden)

    Luis Alberto Mora Belandria

    2017-08-01

    Full Text Available The learning projects allow the teacher to recognize their experiences, knowledge, skills, strengths, weaknesses, potentialities to decide what and how to teach; Allow the contextualization of components of knowledge areas with a holistic and systemic view, taking from the environment data, events, knowledge that contribute to the humanist and integral formation of students, to the development of their social conscience, to the achievement of the profile of the new Citizen who aspires to society. This in its management process will enhance the reconstruction of thought to achieve teaching. The study generated theoretical references of the transdisciplinary planning of the learning projects; Framed in a qualitative approach, supported by the documentary method, using hermeneutic-dialectical validity and reliability, with the qualitative research processes: categorization, structuring, contrasting and theorizing. It was evidenced that the teachers in the planning of the learning projects show a mechanical and routine attitude, which does not allow to see the systemic relation of the planning process, there is fragmentation, the teacher does not achieve the transdisciplinarity of the curriculum due to its positivist vision of reality. It is necessary to direct a teaching perspective based on the epistemological reconstruction of its action based on transdisciplinarity.

  9. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  10. Rum Jungle rehabilitation project

    International Nuclear Information System (INIS)

    Kraatz, M.; Appelegate, R.J.

    1992-01-01

    In the late 1960's and 1970's it was recognised that pollutants emanating from the abandoned Rum jungle uranium mine in the Northern Territory of Australia were responsible for severe environmental degradation of the Finniss River system. Products of acid mine drainage and low level radioactive material released from the tailings dam resulted in the virtual absence of flora and fauna species for ten kilometres downstream of the mine. In 1982 a joint Federal and Northern Territory government project was established to rehabilitate the abandoned Rum Jungle site. This project successfully achieved a major reduction in surface water pollution, public health hazard, (including radiation levels), pollution levels in the Open Cut water bodies and aesthetic improvement, including revegetation. Monitoring of the site is continuing up to the present date to determine the ongoing success of the project. This includes evaluation of the surface water quality, chemical activity and water balance within the overburden heaps, groundwater hydrology and an assessment of revegetation success, erosion control structures and cover stability. This document presents the results of monitoring activities conducted between 1986 and 1988 and outlines management and maintenance programs during that time. 36 refs., 40 figs., 47 tabs., 11 ills

  11. The COMPOSE Project

    Science.gov (United States)

    Balletta, P.; Biagini, M.; Gallinaro, G.; Vernucci, A.

    2003-07-01

    This paper provides an overview of the on-going project COMPOSE, an EC co-funded project aiming to define, specify and validate an innovative mobile-services scenario in support of travellers, and to demonstrate the effectiveness of the new proposed location-based value-added services. COMPOSE is supported by organisations belonging to numerous categories covering, as a whole, the entire value-chain of infomobility services provision to the final user. The project team comprises, in addition to the affiliations of the authors, also Teleatlas (NL), ARS T&TT (NL), Alcatel-Bell Space (B), Skysoft (P), Hitech Marketing (A) and MobileGis (IR). The paper describes the services that will be offered to users, encompassing both the pre-trip and the on-trip framework, presents the overall hybrid system architecture also including a via-satellite component based upon the Wideband-CDMA (W-CDMA) technique adopted in UMTS, discusses the access solutions envisaged for that component permitting multiple feeder-link stations to share the CDMA multiplex capacity by directly transmitting their codes to the satellite, and illustrates the results of some computer simulations intended to assess the performance of said access solutions, with regard to the effects of the inevitable up- link frequency errors and transponder non-linearity.

  12. Final Project Report

    DEFF Research Database (Denmark)

    Workspace

    2003-01-01

    of the Disappearing Computer to be that of  “Augmenting reality”, where “Augmented reality” meant:  •  Augmented user – positioning, visualising. •  Augmented environment, Panels, tables and site-pack •  Augmented Artifacts - RFID , tagging, tracking •  Augmented communications – efficient exchange and integration......The primary focus of the WORKSPACE project was to augment the working  environment through the development of spatial computing components, initially for  members of the design professions, but with wider applicability to a range of work  domains.     The project interpreted the requirements...... of the above.    The philosophy was to make the computer disappear by both making it large and  embedding it into the environment (e.g. furniture).  The project has successfully achieved its objectives, and has developed a range of  demonstrator prototypes, some of which is in daily use by practitioners within...

  13. Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Craig [National Rural Electric Cooperative Association, Arlington, VA (United States); Carroll, Paul [National Rural Electric Cooperative Association, Arlington, VA (United States); Bell, Abigail [National Rural Electric Cooperative Association, Arlington, VA (United States)

    2015-03-11

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and

  14. Relationship between the IT projects performance and project management maturity

    Directory of Open Access Journals (Sweden)

    Renato de Oliveira Moraes

    2013-03-01

    Full Text Available This paper presents a study on the relationship between performance of IT projects and the project management maturity of performing organization. The research was conducted through a survey with 185 respondents during the year 2010. The project performance was evaluated through the first two dimensions Shenhar et al (2001 - project efficiency and customer impact. The maturity of project management was assessed by the level of formalization of procedures for project management described in PMBoK. The data were analyzed using statistical procedures (factor analysis, Cronbach's alpha, cluster analysis and bivariate analysis and revealed that (i that organizations with higher maturity have a superior performance in their projects, and (ii different dimensions of maturity has different impacts on the performance of IT projects.

  15. Storytelling for project knowledge management across the project life cycle

    Directory of Open Access Journals (Sweden)

    Narges Farzaneh

    2014-03-01

    Full Text Available Project organizations face the problems to manage knowledge embedded in various projects because of the uniqueness and short-term orientation of most projects. Therefore, project knowledge management is regarded as an important approach to building competitive advantages. This paper aimed to examine the application of storytelling as an effective and inexpensive mechanism for managing project knowledge. The study was conducted with the project management office from the Tax Administration and Reform Automation (TARA program in Iran. A questionnaire survey was used to analyze the storytelling applications in the projects of the TARA program. Based on the result, a conceptual framework of storytelling was proposed for integration into the project management lifecycle.

  16. Map projections: A working manual

    Science.gov (United States)

    Snyder, John P.

    1987-01-01

    After decades of using only one map projection, the Polyconic, for its mapping program, the U.S. Geological Survey (USGS) now uses several of the more common projections for its published maps. For larger scale maps, including topographic quadrangles and the State Base Map Series, conformal projections such as the Transverse Mercator and the Lambert Conformal Conic are used. Equal-area and equidistant projections appear in the National Atlas. Other projections, such as the Miller Cylindrical and the Van der Grinten, are chosen occasionally for convenience, sometimes making use of existing base maps prepared by others. Some projections treat the Earth only as a sphere, others as either ellipsoid or sphere.

  17. TINY HOUSE VILLAGE PROJECT : Creating a community development project

    OpenAIRE

    Toivainen, Jukka

    2015-01-01

    ABSTRACT Toivainen, Jukka. Tiny house village project. Creating a community development project. 40 p., 1 appendix. Language: English. Helsinki, Autumn 2015. Diaconia University of Applied Sciences. Degree Programme in Social Services, Option in Diaconal Social Work. Degree: Bachelor of Social Services (UAS) + Qualification for the office of diaconia worker in the Church of Finland. This thesis is telling about creating a project idea and a project proposal of producing wooden wall...

  18. Does Lean & Agile Project Management Help Coping with Project Complexity?

    OpenAIRE

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project complexity. In this paper we aim to understand if the implicit usage of lean and agile help coping with complexity. The research was done by means of correlation analysis on data gathered from a structur...

  19. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  20. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    This study was undertaken to establish how project management and the project manager can be used as a panacea for preventing building and infrastructural collapse in Nigeria. The paper is necessary because of the importance of proper planning and monitoring of project activities in order to avoid building and ...

  1. 40 CFR 258.41 - Project XL Bioreactor Landfill Projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Project XL Bioreactor Landfill Projects. 258.41 Section 258.41 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Design Criteria § 258.41 Project XL Bioreactor...

  2. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  3. The Peralta Colleges Inner-City Project: A Demonstration Project.

    Science.gov (United States)

    Elsner, Paul A.

    This is the first of four reports in The Urban Community College Project Series. The report is based on the evaluation of Peralta College's Inner City Project through eight broad questions concerning the project's effectiveness as an agent of change. Most of the questions deal with outcomes that, it was initially hoped, would result from the…

  4. Projections of Veronese surface and morphisms from projective ...

    Indian Academy of Sciences (India)

    Projective plane; vector bundles; morphisms; Grassmannian; Veronese ... A general projection has this property. It is well known that the Veronese surface is the unique closed orbit for the natural action of the algebraic group P GL(3, .... Globally generated vector bundle on projective spaces with special Chern classes are.

  5. The Human Genome Diversity Project

    Energy Technology Data Exchange (ETDEWEB)

    Cavalli-Sforza, L. [Stanford Univ., CA (United States)

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  6. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  7. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Podzorov, Vitaly [Rutgers Univ., New Brunswick, NJ (United States)

    2012-10-28

    The scope of this project is to investigate fundamental aspects of self-assembled monolayers (SAMs) grown at the surface of organic semiconductors and other electronic materials, recently discovered in our group (Fig. 1) [1]. Understanding the growth mechanism and structure of these SAMs, as well as investigating the effect of SAM-induced high surface conductivity, are the main thrusts of the project. An additional thrust of the project is to find new ways of surface doping or surface gating of novel semiconductors, in which electronic traps at the interface would be passivated. Molecular self assembly is an exciting research area of modern materials science, playing an important role in a variety of emerging applications, such as organic and molecular electronics, bioengineering, sensors and actuators. The current effort in this field has been focused on two experimental platforms: SAMs on metals (e.g., Au) and SAMs on inorganic oxides (e.g., SiO2). We have recently discovered the third platform, molecular self-assembly at the surface of carbon-based electronic materials (organic semiconductors, graphene and CNTs), which opens new opportunities for fundamental research and applications (Fig. 1) [1, 2, 3]. One of the most intriguing aspects of the new discovery is that formation of an FTS self-assembled monolayer on these materials induces a high-density mobile charges, with n up to 1014 cm-2, resulting in a large surface conductivity, σ ≈ 10-5 S·square-1 [1]. The effect is due to an interfacial electron transfer from the semiconductor to the SAM, resulting in a 0.54 V potential drop across the 1.3 nm-thick SAM, as recently revealed by Kelvin probe microscopy in rubrene [4].

  8. Henretta Creek reclamation project

    International Nuclear Information System (INIS)

    Pumphrey, J.F.

    2009-01-01

    Teck Coal Ltd. operates 6 open-pit coal mines, of which 5 are located in the Elk Valley in southeastern British Columbia. The Fording River Operations (FRO) began in 1971 in mining areas in Eagle Mountain, Turnbull Mountain and Henretta Valley. The recovery of approximately 5 million tons of coal from the Henretta Creek Valley posed significant challenges to mine planners, hydrologists and environmental experts because the coal had to be recovered from the valley flanks and also from under the main valley floor, on which the fish-bearing Henretta Creek runs. The Henretta Dragline Mining project was described along with the water control structures and fisheries management efforts for the cutthroat trout. A detailed Environmental Impact Assessment and Stage 1 mining report for the Henretta Valley area was completed in December 1990. FRO was granted a mining and reclamation permit in 1991. A temporary relocation of 1,270 metres was required in in April 1997 in order to enable mining on both sides and below the creek bed. Among the innovative construction techniques was a diversion of Henretta Creek through large diameter steel culverts and a specialized crossing of the creek to allow fish passage. The first water flowed through the reclaimed Henretta Creek channel in late 1998 and the first high flow occurred in the spring of 2000. Teck coal FRO then launched an annual fish and fish habitat monitoring program which focused on the Henretta Creek Reclaimed Channel and Henretta Lake. This document presented the results from the final year, 2006, and a summary of the 7 year aquatic monitoring program. It was concluded that from mining through to reclamation, the Henretta project shows the commitment and success of mining and reclamation practices at Teck Coal. Indicators of the project's success include riparian zone vegetation, fisheries re-establishment, aquatic communities and habitat utilization by terrestrial and avian species. 33 refs., 1 fig.

  9. The APACHE Project

    Directory of Open Access Journals (Sweden)

    Giacobbe P.

    2013-04-01

    Full Text Available First, we summarize the four-year long efforts undertaken to build the final setup of the APACHE Project, a photometric transit search for small-size planets orbiting bright, low-mass M dwarfs. Next, we describe the present status of the APACHE survey, officially started in July 2012 at the site of the Astronomical Observatory of the Autonomous Region of the Aosta Valley, in the Western Italian Alps. Finally, we briefly discuss the potentially far-reaching consequences of a multi-technique characterization program of the (potentially planet-bearing APACHE targets.

  10. NDLGS project update

    Energy Technology Data Exchange (ETDEWEB)

    Lienert, Thomas J [Los Alamos National Laboratory; Sutton, Jacob O [Los Alamos National Laboratory; Piltch, Martin S [Los Alamos National Laboratory; Lujan, Dennis J [Los Alamos National Laboratory

    2011-01-14

    Recent results for laser and ESD processing for the NDLGS project will be reviewed. Conclusions are: (1) Short mix passes have profound effect on window T; (2) Multiple drill and re-weld at single location has been shown to be feasible and successful; (3) Kapton beam profiling method has been successfully developed. Comparison of 100 mm and 120 mm lenses gives reasonable and consistent results; (4) Manifold pumpdown data has been presented; (5) ESO results can be accurately predicted once a repeatable efficiency has been established; and (6) The electrode-workpiece geometry may play an important on ESO efficiency. Experiments are planned to investigate these effects.

  11. Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    Aines, R.; Newmark, R.; McConachie, W.; Udell, K.; Rice, D.; Ramirez, A.; Siegel, W.; Buettner, M.; Daily, W.; Krauter, P.; Folsom, E.; Boegel, A.J.; Bishop, D.; Udell, K.

    1992-01-01

    LLNL is collaborating with the UC Berkeley College of Engineering to develop and demonstrate a system of thermal remediation and underground imaging techniques for use in rapid cleanup of localized underground spills. Called ''Dynamic Stripping'' to reflect the rapid and controllable nature of the process, it will combine steam injection, direct electrical heating, and tomographic geophysical imaging in a cleanup of the LLNL gasoline spill. In the first 8 months of the project, a Clean Site engineering test was conducted to prove the field application of the techniques before moving the contaminated site in FY 92

  12. The Nephrocare project

    DEFF Research Database (Denmark)

    Bergrem, Harald; Gøransson, Lasse; Asmundsson, Pall

    2009-01-01

    : In a joint quality of care development project between the renal societies of the five Nordic countries and the unit for Quality of Health Systems, WHO (Europe), 19 renal units collected data on a random sample of their prevalent patients. RESULTS: At follow-up, 56% had chronic kidney disease (CKD...... prescribed an angiotensin-inhibiting drug. CONCLUSIONS: The data, collected in 1998-99, indicate that there is room for improvement in the quality of care provided by renal units to patients with CKD. The data may serve as a basis for assessing possible change in nephrological practice after the introduction...

  13. The Ariane project

    International Nuclear Information System (INIS)

    Luton, J.-M.; Schmitt, D.

    1999-01-01

    The Ariane project was decided on in 1973, in the framework of European space cooperation at the occasion of the birth of the European Space Agency. In 1979, the first Ariane was a technical success. The evolution of the launcher and the creation of the company 'Arianespace', in charge of the production, the commercialisation of the launching and the operations of launching have transformed this technical success into an economic success, since this company has kept 60% of the commercial market of launch services. (orig.)

  14. The SITLESS project

    DEFF Research Database (Denmark)

    Giné-Garriga, Maria; Coll-Planas, Laura; Guerra, Míriam

    2017-01-01

    BACKGROUND: Older adults are the fastest growing segment of the world's population. Recent evidence indicates that excessive sitting time is harmful to health, independent of meeting the recommended moderate to vigorous physical activity (PA) guidelines. The SITLESS project aims to determine...... whether exercise referral schemes (ERS) can be enhanced by self-management strategies (SMSs) to reduce sedentary behaviour (SB), increase PA and improve health, quality of life and function in the long term, as well as psychosocial outcomes in community-dwelling older European citizens from four countries...

  15. The DWARF project

    Science.gov (United States)

    Christopoulou, P. E.

    2013-09-01

    In the era of staggering Kepler data and sophisticated approach of the automatic analysis, how obsolete are the traditional object-by-object multiwavelength photometric observations? Can we apply the new tools of classification, light curve modeling and timing analysis to study the newly detected or/and most interesting Eclipsing Binaries or to detect circumbinary bodies? In this talk, I will discuss developments in this area in the light of the recent DWARF project that promises additional useful science of binary stars within an extensive network of relatively small to medium-size telescopes with apertures of ~20-200 cm.

  16. The Project

    DEFF Research Database (Denmark)

    Brabrand, Claus; Møller, Anders; Schwartzbach, Michael Ignatieff

    2002-01-01

    . Using specialized program analyses, certain Web-specific properties are verified at compile time, for instance that only valid HTML 4.01 is ever shown to the clients. In addition, the design provides high-level solutions to form field validation, caching of dynamic pages, and temporal-logic based......We present the results of the project, which aims to design and implement a high-level domain-specific language for programming interactive Web services. A fundamental aspect of the development of the World Wide Web during the last decade is the gradual change from static to dynamic generation...

  17. Hawaii geothermal project

    Science.gov (United States)

    Kamins, R. M.

    1974-01-01

    Hawaii's Geothermal Project is investigating the occurrence of geothermal resources in the archipelago, initially on the Island of Hawaii. The state's interest in geothermal development is keen, since it is almost totally dependent on imported oil for energy. Geothermal development in Hawaii may require greater participation by the public sector than has been true in California. The initial exploration has been financed by the national, state, and county governments. Maximization of net benefits may call for multiple use of geothermal resources; the extraction of by-products and the application of treated effluents to agricultural and aquacultural uses.

  18. Planning Complex Projects Automatically

    Science.gov (United States)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  19. CORONA - project overview

    International Nuclear Information System (INIS)

    Pironkov, L.

    2012-01-01

    The essence of the project is to provide a special purpose structure for training and qualification of personnel for serving VVER technology as one of nuclear power options used in EU. Such approach should allow unifying existing VVER related training schemes according to IAEA standards and commonly accepted criteria recognized in EU. In this regard, the implementation of ECVET ( E uropean Credit system for Vocational Education and Training ) in the sectors of nuclear fission and radiation protection is particularly important in all education and training actions under Euratom. International Nuclear Conference “Bulgarian

  20. Work Project Report

    CERN Document Server

    Sallinen, Roosa-Maria

    2015-01-01

    I worked in High Power Converters section (HPC). My supervisors were Karsten Kahle and Charles-Mathieu Genton. Our team consisted of us and Francisco Rafael Blanquez Delgado who also helped me if I had any problems. The team’s main assignment is to design the new Static Var Compensator (SVC) for MEQ59 in Meyrin. The idea is to standardise all the SVCs needed at CERN in order to make the design, installation and maintenance easier and more cost effective. This report describes my project at CERN.

  1. SALCER´s Project

    Directory of Open Access Journals (Sweden)

    Carlos Pérez

    2009-12-01

    Full Text Available SALCER (in Spanish: Sistema de Asesoramiento y Localización de Centrales de EnergíaRenovables could be translated as Counseling and Location of Renewable Energy Power Station´s System. Its objective is to develop a system capable of finding the most suitable place for the construction of renewable power stations, taking into account such things as: budget, topography, amount of energy needed, among others. The most relevant aims of the project are: study of a certain variety of renewable energy technologies, designing an accurate topology system, restraining decisions to demand forecasts and finally performance of an energy plan for a specific region

  2. Practical Android Projects

    CERN Document Server

    Jordan, Lucas

    2011-01-01

    Take a practical approach to becoming a leading-edge Android developer, learning by example while combining the many technologies needed to create a successful, up-to-date web app. Practical Android Projects introduces the Android software development kit and development tools of the trade, and then dives into building cool-looking and fun apps that put Android's amazing capabilities to work. Android is the powerful, full-featured, open source mobile platform that powers phones like Google Nexus, Motorola Droid, Samsung Galaxy S, and a variety of HTC phones and tablet computers. This book help

  3. The Reccord project

    DEFF Research Database (Denmark)

    2017-01-01

    Across Europe, cultural centers engage citizens in a variety of artistic and social activities. But what are the characteristics of cultural centers, what kinds of citizen participation take place in them, and to what effects? This has been investigated in RECcORD, a European research project...... involving 38 cultural centers and Birgit Eriksson, Carsten Stage and Camilla Møhring Reestorff from Aarhus University. The film “The RECcORD Project”, made by GotFat Productions, presents some of the findings and provides new knowledge about cultural centers and citizen participation....

  4. The @Home project

    DEFF Research Database (Denmark)

    Coxon, Ian Robert

    2014-01-01

    of being overshadowed by what is increasingly seen as new (and substantial) pharmacological and health equipment business market opportunities in what is now viewed as a health 'industry'. The Centre for Innovation at Mayo Clinic (CFI) in Rochester USA, has conducted many projects which border on and have...... investigated various aspects of care provision and patient experience within a patient's home environment. Considerable work by other researchers inside and outside the health field has also contributed insights and platforms for moving healthcare in this direction. In most areas of the western world...

  5. Project Earth Lover

    Energy Technology Data Exchange (ETDEWEB)

    Slobotski, Stephanie,

    2011-09-01

    Under this project, the Ponca Tribe of Nebraska (PTN) will conduct An Energy Options Analysis (EOA) to empower Tribal Leadership with critical information to allow them to effectively screen energy options that will further develop the Tribe's long-term strategic plan and energy vision. The PTN will also provide community workshops to enhance Tribal Members' capabilities, skills and awareness of energy efficiency and conservation technology and practices. A 90- minute workshop will be conducted at each of the 5 sites and one-hundred tribal members will receive an erergy efficiency kit.

  6. The Phaeton project

    International Nuclear Information System (INIS)

    Kavenoky, A.; Lautard, J.J.; Collart, J.M.; Fedon-Magnaud, C.

    1986-06-01

    The objective of project PHAETON is a reduction of the shutdown margins associated with an inaccurate appreciation of actual core conditions throughout the cycle. This lack of accuracy primarily affects, at some of the fuel pellets, the values of local parameters which determine the safety criteria ensuring fuel rod integrity: local power, and, local burnup. The four-processor demonstrator has shown the feasibility of providing power plant sites with microprocessor-based computers. Such computers combine high capability and low cost. In its future version, it should permit on-line computation of the three-dimensional flux distribution, with fitting to in-core measurement data at one-minute intervals

  7. Practical Django projects

    CERN Document Server

    Bennett, James

    2009-01-01

    Build a django content management system, blog, and social networking site with James Bennett as he introduces version 1.1 of the popular Django framework. You'll work through the development of each project, implementing and running the applications while learning new features along the way. Web frameworks are playing a major role in the creation of today's most compelling web applications, because they automate many of the tedious tasks, allowing developers to instead focus on providing users with creative and powerful features. Python developers have been particularly fortunate in this area

  8. The Berlin communications project

    International Nuclear Information System (INIS)

    Felix, R.; Langer, M.; Astinet, F.; Zendel, W.

    1990-01-01

    As part of radiological communication project (RADKOM), two PACS systems of the radiological clinic in the Rudolf Virchow University Clinic in Charlottenburg and Wedding were connected via the Berkom network of the German Post Office. Within the radiology departments, all CT and MRT systems were joined through a local network. The first results have shown that the PACS stations are of value for providing uniformity of diagnosis and for radiological conferences. It is evident, however, that the speed of transfer and the architecture within the PACS system would be of crucial importance for their practicability for radiological conferences. (orig.) [de

  9. Project-Based Teaching: Helping Students Make Project Connections

    Science.gov (United States)

    Johnson, Heather Jo Pusich

    Project-based curriculum materials are designed to support students in engaging with scientific content and practices in meaningful ways, with the goal of improving students' science learning. However, students need to understand the connections between what they are doing on a day-to-day basis with respect to the goals of the overall project for students to get the motivational and cognitive benefits of a project-based approach. In this dissertation, I looked at the challenges that four ninth grade science teachers faced as they helped students to make these connections using a project-based environmental science curriculum. The analysis revealed that in general when the curriculum materials made connections explicit, teachers were better able to articulate the relationship between the lesson and the project during enactment. However, whether the connections were explicit or implicit in the materials, enactments of the same lesson across teachers revealed that teachers leveraged different aspects of the project context in different ways depending on their knowledge, beliefs, and goals about project-based teaching. The quantitative analysis of student data indicated that when teacher enactments supported project goals explicitly, students made stronger connections between a lesson and the project goal. Therefore, a teacher's ability to make clear connections during classroom instruction is essential. Furthermore, when students made connections between each lesson and the larger project goals their attitudes toward the lesson were more positive and they performed better on the final assessment. These findings suggest that connections between individual lessons and the goals of the project are critical to the effectiveness of project-based learning. This study highlights that while some teachers were able to forge these connections successfully as a result of leveraging cognitive resources, teachers' beliefs, knowledge and goals about project-based teaching are

  10. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W; Syffus, Rainer

    2014-01-01

    This book offers a timely review of map projections including sphere, ellipsoid, rotational surfaces, and geodetic datum transformations. Coverage includes computer vision, and remote sensing space projective mappings in photogrammetry.

  11. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  12. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  13. The Veteran Population Projection 2014

    Data.gov (United States)

    Department of Veterans Affairs — VetPop2014 is an actuarial projection model developed by the Office of the Actuary (OACT) for Veteran population projection from Fiscal Year FY2014 to FY2043. Using...

  14. [Theme: Achieving Quality Laboratory Projects.[.

    Science.gov (United States)

    Shinn, Glen C.; And Others

    1983-01-01

    The theme articles present strategies for achieving quality laboratory projects in vocational agriculture. They describe fundamentals of the construction of quality projects and stress the importance of quality instruction. (JOW)

  15. Global Project Management: Graduate Course

    National Research Council Canada - National Science Library

    Beranek, Thomas R

    2006-01-01

    ..., A. James Clark School of Engineering - Project Management Program. The course slides and suggested readings provide a general exploration of the nuances of doing projects globally as compared to domestically...

  16. Rethinking Project Management in Denmark

    DEFF Research Database (Denmark)

    Svejvig, Per

    2012-01-01

    and methodologies for project management has been fairly static and has therefore received substantial criticism for a lack of relevance to practice. Several scholars have therefore started to think more widely about projects and project management conceptualized as rethinking project management. However this theme......Projects are everywhere across different sectors, industries and countries. Project management is no longer a sub-discipline of engineering and other rather technical disciplines but is also used for many other purposes. Even though practice has changed dramatically over the years, the models...... has lived a somewhat quiet life in Denmark, which leads to the purpose of this chapter, which is to set the stage for rethinking project management in Denmark. The chapter is based on an empirical study within the Danish project management community and beyond where we discuss this rethinking process...

  17. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...

  18. STEER Coastal Use Mapping Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Coastal Use Mapping Project is designed to collect critical information on human activities in and near the St. Thomas East End Reserves (STEER). The project...

  19. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W

    2006-01-01

    In the context of Geographical Information Systems (GIS) the book offers a timely review of map projections (sphere, ellipsoid, rotational surfaces) and geodetic datum transformations. For the needs of photogrammetry, computer vision, and remote sensing space projective mappings are reviewed.

  20. OVERVIEW ABOUT PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2013-12-01

    Full Text Available The purpose of this study is to emphasize the main aspects regarding project quality management. This study tries to present in the comparative manner, different approaches of the main guidelines, international standards and methodologies regarding project quality management (the PMBOK ® Guide elaborated by the Project Management Institute, the PRINCE method elaborated by the British Office of Government Commerce etc.. The PMBOK® Guide describes three elements (processes of quality management: quality planning (plan quality management, quality assurance (perform quality assurance and quality control (control quality. The PMBOK approach regarding project quality management is that quality management must lead to achieving and validating project requirements. According the PRINCE method the quality is one of the six variables involved in any project. The PRINCE approach regarding project quality management considers that strategy in this field must lead to achieving just the level of quality needed to achieve in the project and not to ensuring the best quality.