WorldWideScience

Sample records for safety action plan

  1. NPP Krsko Periodic Safety Review action plan

    International Nuclear Information System (INIS)

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  2. IAEA Sets Up Team to Drive Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency is setting up a Nuclear Safety Action Team to oversee prompt implementation of the IAEA Action Plan on Nuclear Safety and ensure proper coordination among all stakeholders. The 12-point Action Plan, drawn up in the wake of the Fukushima Daiichi accident, was approved by the Agency's Board of Governors on 13 September and endorsed by all 151 Member States at its General Conference last week. The team will work within the Agency's Department of Nuclear Safety and Security, headed by Deputy Director General Denis Flory, and will coordinate closely with the Director General's Office for Policy. ''The Action Plan requires immediate follow-up,'' Director General Yukiya Amano said. ''This compact, dedicated team will assist Deputy Director General Flory in implementing the measures agreed in the Action Plan.'' Gustavo Caruso, Head of the Regulatory Activities Section in the IAEA's Division of Installation Safety, has been designated as the team's Special Coordinator for the implementation of the Action Plan. The IAEA has already started implementing its responsibilities under the Action Plan, including development of an IAEA methodology for stress tests for nuclear power plants. The methodology will be ready in October. (IAEA)

  3. The Norwegian Plan of Action for nuclear safety issues

    International Nuclear Information System (INIS)

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects

  4. The Norwegian Plan of Action for nuclear safety issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects.

  5. Overview of IAEA Action Plan on Nuclear Safety

    International Nuclear Information System (INIS)

    Monti, Stefano

    2012-01-01

    The IAEA Action Plan represents a work programme to strengthen and improve nuclear safety world wide. The plan identifies actions for Member States and the IAEA. Success depends upon: • Cooperation between IAEA, Member States, and other stakeholders; • Availability of appropriate financial resources (MS voluntary contributions)

  6. Task Group on Safety Margins Action Plan (SMAP). Safety Margins Action Plan - Final Report

    International Nuclear Information System (INIS)

    Hrehor, Miroslav; Gavrilas, Mirela; Belac, Josef; Sairanen, Risto; Bruna, Giovanni; Reocreux, Michel; Touboul, Francoise; Krzykacz-Hausmann, B.; Park, Jong Seuk; Prosek, Andrej; Hortal, Javier; Sandervaag, Odbjoern; Zimmerman, Martin

    2007-01-01

    The international nuclear community has expressed concern that some changes in existing plants could challenge safety margins while fulfilling all the regulatory requirements. In 1998, NEA published a report by the Committee on Nuclear Regulatory Activities on Future Nuclear Regulatory Challenges. The report recognized 'Safety margins during more exacting operating modes' as a technical issue with potential regulatory impact. Examples of plant changes that can cause such exacting operating modes include power up-rates, life extension or increased fuel burnup. In addition, the community recognized that the cumulative effects of simultaneous changes in a plant could be larger than the accumulation of the individual effects of each change. In response to these concerns, CSNI constituted the safety margins action plan (SMAP) task group with the following objectives: 'To agree on a framework for integrated assessments of the changes to the overall safety of the plant as a result of simultaneous changes in plant operation / condition; To develop a CSNI document which can be used by member countries to assess the effect of plant change on the overall safety of the plant; To share information and experience.' The two approaches to safety analysis, deterministic and probabilistic, use different methods and have been developed mostly independently of each other. This makes it difficult to assure consistency between them. As the trend to use information on risk (where the term risk means results of the PSA/PRA analysis) to support regulatory decisions is growing in many countries, it is necessary to develop a method of evaluating safety margin sufficiency that is applicable to both approaches and, whenever possible, integrated in a consistent way. Chapter 2 elaborates on the traditional view of safety margins and the means by which they are currently treated in deterministic analyses. This chapter also discusses the technical basis for safety limits as they are used today

  7. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues

    International Nuclear Information System (INIS)

    1992-12-01

    This report is to provide a comprehensive description of the implementation and verification status of Three Mile Island (TMI) Action Plan requirements, safety issues designated as Unresolved Safety Issues (USIs), Generic Safety Issues(GSIs), and other Multiplant Actions (MPAs) that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  8. Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues

    International Nuclear Information System (INIS)

    1993-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  9. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  10. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues. Supplement 4

    International Nuclear Information System (INIS)

    1994-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. Supplement 3 gives status as of September 30, 1993. This annual report, Supplement 4, presents updated information as of September 30, 1994. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  11. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is required. 1106.3 Section 1106.3 Transportation Other Regulations Relating to Transportation (Continued... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS...

  12. Status of safety issues at licensed power plants: TMI action plan requirements, unresolved safety issues, generic safety issues

    International Nuclear Information System (INIS)

    1991-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program was established whereby an annual NUREG report would be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was compiled and reported in three NUREG volumes. Volume 1, published in March 1991, addressed the status of of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). This annual NUREG report combines these volumes into a single report and provides updated information as of September 30, 1991. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. This report is to provide a comprehensive description of the implementation and verification status of TMI Action Plan Requirements, safety issues designated as USIs, and GSIs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  13. Radiation safety analysis and action plans for NSRRC top-up operation

    International Nuclear Information System (INIS)

    Wang, J.-P.; Sheu, R.-J.; Liu, Joseph C.; Chen, C.-R.; Chang, F.-D.; Kao, S.-P.

    2006-01-01

    This paper summarizes the radiation safety analysis and action plans for the upcoming top-up operation at the National Synchrotron Radiation Research Center (NSRRC). Electron beam loss scenarios and consequence of beam lifetime and injection efficiency have been studied. Dose assessment was conducted based on measurement and Monte Carlo simulation results. Radiation safety action plans such as upgrading the shielding of the injection section, enlarging the exclusion zones of the straight section beamlines, installing new interlock system for top-up operation and most importantly improving the injection efficiency have been scheduled. The goal is to keep present dose limit of 2 mSv/y and make top-up operation feasible at normal user's run of year 2006

  14. Stress Tests Worldwide - IAEA Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    Lyons, J.E.

    2012-01-01

    The IAEA nuclear safety action plan relies on 11 important issues. 1) Safety assessments in light of the Fukushima accident: the IAEA secretariat will develop a methodology for stress tests against specific extreme natural hazards and will provide assistance for their implementation; 2) Strengthen existing IAEA peer reviews; 3) Emergency preparedness and response; 4) National Regulatory bodies in terms of independence and adequacy of human and financial resources; 5) The development of safety culture and scientific and technical capacity in Operating Organizations; 6) The upgrading of IAEA safety standards in a more efficient way; 7) A better implementation of relevant conventions concerning nuclear safety and nuclear accidents; 8) To provide a broad assistance on safety standard for countries embarking on a nuclear power program; 9) To facilitate the use of available information, expertise and techniques concerning radiation protection; 10) To enhance the transparency of nuclear industry; and 11) To promote the cooperation between member states in nuclear safety. (A.C.)

  15. Patient safety in the care of mentally ill people in Switzerland: Action plan 2016

    Science.gov (United States)

    Richard, Aline; Mascherek, Anna C; Schwappach, David L B

    2017-01-01

    Background: Patient safety in mental healthcare has not attracted great attention yet, although the burden and the prevalence of mental diseases are high. The risk of errors with potential for harm of patients, such as aggression against self and others or non-drug treatment errors is particularly high in this vulnerable group. Aim: To develop priority topics and strategies for action to foster patient safety in mental healthcare. Method: The Swiss patient safety foundation together with experts conducted round table discussions and a Delphi questionnaire to define topics along the treatment pathway, and to prioritise these topics. Finally, fields of action were developed. Results: An action plan was developed including the definition and prioritization of 9 topics where errors may occur. A global rating task revealed errors concerning diagnostics and structural errors as most important. This led to the development of 4 fields of action (awareness raising, research, implementation, and education and training) including practice-oriented potential starting points to enhance patient safety. Conclusions: The action plan highlights issues of high concern for patient safety in mental healthcare. It serves as a starting point for the development of strategies for action as well as of concrete activities.

  16. The technical approach: The IAEA action plan on the safety of radiation sources

    International Nuclear Information System (INIS)

    Bilbao, A.; Wrixon, A.; Ortiz-Lopez, P.

    2001-01-01

    As part of the measures to strengthen international co-operation in nuclear, radiation and waste safety, the report refers to the implementation of the Action Plan for the Safety of Radiation Sources and the Security of Radioactive Materials. Starting with background information, the report references the main results of the Dijon Conference and of General Conference resolution GC(42)/RES/12 in September 1998, describing the actions taken by the Secretariat pursuant such resolution and also by the Board of Governors, in its sessions of March and September 1999, as well as by the General Conference, in October 1999 when by resolution GC(43)/RES/10 the Action Plan was endorsed and the Secretariat was urged to implement it. Finally, the report provides information on the status of implementation of the seven areas covered by the Action Plan and on the suggested further actions to be carried out for its implementation taking into account the decisions of the Board in its meeting of 11 September 2000 and the resolutions GC(44)/RES/11, GC(44)/RES/13 and GC(44)/RES/16 of the forty-fourth regular session of the General Conference. (author)

  17. Draft IAEA Action Plan on Nuclear Safety. Report by the Director General

    International Nuclear Information System (INIS)

    Amano, Y.

    2011-01-01

    In accordance with paragraphs 23 and 24 of the Declaration adopted by the Ministerial Conference on Nuclear Safety held on 20-24 June 2011, the Director General was requested to prepare and present to the Board of Governors and the General Conference at their September 2011 meetings a report on the Ministerial Conference and a draft Action Plan, building on the Ministerial Declaration, the conclusions and recommendations of the working sessions of the Ministerial Conference and the expertise and knowledge available therein, and to facilitate consultations among Member States on the draft Action Plan. This draft Action Plan is the result of an extensive process of consultations with Member States and responds to the request contained in the Ministerial Declaration.

  18. Overview criteria for the environmental, safety and health evaluation of remedial action project planning

    International Nuclear Information System (INIS)

    Stenner, R.D.; Denham, D.H.

    1984-10-01

    Overview criteria (i.e., subject areas requiring review) for evaluating remedial action project plans with respect to environmental, safety and health issues were developed as part of a Department of Energy, Office of Operational Safety, technical support project. Nineteen elements were identified as criteria that should be addressed during the planning process of a remedial action (decontamination and decommissioning) project. The scope was interpreted broadly enough to include such environmental, safety and health issues as public image, legal obligation and quality assurance, as well as more obvious concerns such as those involving the direct protection of public and worker health. The nineteen elements are discussed along with suggested ways to use a data management software system to organize and report results

  19. The Emergency Action Plan of the Spanish Nuclear Safety Council (CSN)

    International Nuclear Information System (INIS)

    Calvin Cuarteto, M.; Camarma, J. R.; Martin Calvarro, J. M

    2007-01-01

    The Spanish Nuclear safety Council (CSN) has assigned by law among others the function to coordinate the measures of support and answer to nuclear emergency situations for all the aspects related with nuclear safety and radiological protection. Integrating and coordinating the different organisations public and private companies whose aid is necessary for the fulfilment of the functions attributed to the Regulatory Body. In order to suitable perform this function, CSN has equipped itself with an Emergency Action Plan that structures the response organization, establishes responsibility levels, incorporates basic performance procedures and includes capabilities to face the nuclear and radiological emergencies considering the external supports, resulting from the collaboration agreements with public institutions and private companies. To accomplish the above mentioned Emergency Action Plan, CSN has established and implanted a formation and training and re-training program for the organization response for emergencies and has update an operative centre (Emergency Room called Salem), equipped with infrastructures, tools and communication and operative systems that incorporate the more advanced technologies available to date. (Author)

  20. Phase II -- Photovoltaics for Utility Scale Applications (PVUSA): Safety and health action plan

    Energy Technology Data Exchange (ETDEWEB)

    Berg, K.

    1994-09-01

    To establish guidelines for the implementation and administration of an injury and illness prevention program for PVUSA and to assign specific responsibilities for the execution of the program. To provide a basic Safety and Health Action Plan (hereinafter referred to as Plan) that assists management, supervision, and project personnel in the recognition, evaluation, and control of hazardous activities and/or conditions within their respective areas of responsibility.

  1. PTTSA Action Plan Report

    International Nuclear Information System (INIS)

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  2. 29 CFR 1915.502 - Fire safety plan.

    Science.gov (United States)

    2010-07-01

    ... implement a written fire safety plan that covers all the actions that employers and employees must take to ensure employee safety in the event of a fire. (See Appendix A to this subpart for a Model Fire Safety... safety plan for their employees, and this plan must comply with the host employer's fire safety plan. ...

  3. 29 CFR 1910.38 - Emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Means of Egress § 1910.38 Emergency action plans. (a) Application. An... plans. An emergency action plan must be in writing, kept in the workplace, and available to employees... information about the plan or an explanation of their duties under the plan. (d) Employee alarm system. An...

  4. Final Action Plan to Tiger Team

    International Nuclear Information System (INIS)

    1992-01-01

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit

  5. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  6. Safety margin evaluation concepts for plant Up rates and life extension. Results of the OECD/NEA/CSNI working group on Safety Margin Action Plan (SMAP)

    International Nuclear Information System (INIS)

    Belac, J

    2006-01-01

    This presentation summarizes results of the OECD/NEA/CSNI working group on Safety Margin Action Plan (SMAP) aimed to develop generalized safety margin concept and means of its quantification for the process of evaluating plant safety in the frame of plant life extension and power up rating activities to be used by OECD member countries. (author)

  7. Remedial action planning for Trench 1

    International Nuclear Information System (INIS)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.; Castaneda, N.

    1998-01-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site

  8. 'Action 2016': AREVA's strategic action plan

    International Nuclear Information System (INIS)

    Marie, Patricia; Briand, Pauline; Floquet-Daubigeon, Fleur; Michaut, Maxime; De Scorbiac, Marie; Du Repaire, Philippine

    2011-01-01

    On December 13, 2011, Luc Oursel, CEO, and Pierre Aubouin, Chief Financial Officer presented the group's strategic plan for the period 2012-2016. The plan has been drawn up collectively and is based on a thorough-going analysis and a realistic assessment of perspectives for all group activities and associated resources. Development of nuclear and renewable energies: the fundamentals are unchanged. In this context, the German decision remains an isolated case and the great majority of nuclear programs around the world have been confirmed. More conservative in its projections than the International Energy Agency, the group expects growth of 2.2% annually, reaching 583 GW of installed nuclear capacity by 2030, against 378 GW today. However, the Fukushima accident will lead to delays in launching new programs. 'Action 2016' plan aims to consolidate AREVA's leadership in nuclear energy and become a leading player in renewable energy. The group's strategic action plan 'Action 2016' is based on the following strategic choices: - commercial priority given to value creation, - selectivity in investments, - strengthening of the financial structure. These demand an improvement in the group's performance by 2015. This plan makes nuclear safety a strategic priority for the industrial and commercial performance of the group. This ambitious performance plan for the period 2012-2016 will give the group the wherewithal to withstand a temporary slowdown in the market resulting from the Fukushima accident and to deliver safe and sustainable growth of the business. The plan sets out the strategic direction for the group's employees for the years ahead: taking advantage of the expected growth in nuclear and renewable energies, targeted investment programs, and return to self-financing as of 2014

  9. The ANSTO waste management action plan

    International Nuclear Information System (INIS)

    Levins, D.

    1997-01-01

    ANSTO's Waste Management Action Plan is a five-year program which addresses legacy issues that have arisen from the accumulation of radioactive wastes at Lucas Heights over the last forty years. Following an extensive review of waste management practices, a detailed Action Plan was prepared involving seventeen projects in the areas of solid wastes, liquid wastes, control of effluents and emissions, spent reactor fuel and organisational issues. The first year of the Waste Management Action Plan has resulted in significant achievements, especially in the areas of improved storage of solid wastes, stabilisation of uranium scrap, commissioning and operation of a scanning system for low-level waste drums, treatment of intermediate-level liquid wastes and improvements in the methods for monitoring of spent fuel storage facilities. The main goal of the Waste Management Action Plan is to achieve consistency, by the year 2000, with best practice as identified in the Radioactive Waste Safety Standards and Guidelines currently under development by the IAEA

  10. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs

  11. [Post-marketing drug safety-risk management plan(RMP)].

    Science.gov (United States)

    Ezaki, Asami; Hori, Akiko

    2013-03-01

    The Guidance for Risk Management Plan(RMP)was released by the Ministry of Health, Labour and Welfare in April 2012. The RMP consists of safety specifications, pharmacovigilance plans and risk minimization action plans. In this paper, we outline post-marketing drug safety operations in PMDA and the RMP, with examples of some anticancer drugs.

  12. EM Health and Safety Plan Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This document contains information about the Health and Safety Plan Guidelines. Topics discussed include: Regulatory framework; key personnel; hazard assessment; training requirements; personal protective equipment; extreme temperature disorders or conditions; medical surveillance; exposure monitoring/air sampling; site control; decontamination; emergency response/contingency plan; emergency action plan; confined space entry; and spill containment.

  13. Action plan in response to March 1981 report to NFPQT Committee

    International Nuclear Information System (INIS)

    1981-03-01

    This plan of action has been prepared at the direction of the Acting Under Secretary in response to the report of the Nuclear Facilities Personnel Qualifications and Training (NFPQT) Committee on A Safety Assessment of Department of Energy Nuclear Reactors. Senior Department officials with Headquarters responsibilities for the safety of nuclear facilities owned by and operated for the Department have developed this plan with input from the operations office managers having operational responsibility for such facilities. A summary of the plan's objectives and a cross-reference to the findings of the NFPQT Committee Report is attached to the plan. Appendix A contains implementing actions and Appendix B contains a summary of actions responsive to lessons learned from the TMI accident that have been completed or are well underway. Although the plan is written in definitive language, the specific actions (such as organization realignments and proposals) will be subject to appropriate review and approval. Also, other adjustments may be required as the actions are implemented

  14. Implementation of a safety action plan: reduction of the dose limits in a research centre

    International Nuclear Information System (INIS)

    Deworm, J.P.

    1992-01-01

    The Belgian Regulations require an annual Action Plan to improve the Safety and health conditions of works. Taking into consideration the preliminary versions of the new ICRP-recommendations, the 1990 Action Plan of the Belgian research Centre aimed to reduce the personal dose limit to 20 mSv/year and the annual collective dose by 10%. Major means used in the campaign were sensibility through information, consultation between hierarchy and executors and the application of a policy of discouragement at certain limits. As a result, the maximum level reaches was 16.5 mSv, while only 7 people received a dose above 10 mSv (of 219 who received a measurable dose, mean value 3,4 mSv). This success is due to the commitment at all levels of responsibilities. In 1991, the 20 mSv-limit is imposed as an obligation by the management, and a feasibility study to impose 10 mSv in near future is being undertaken. (author)

  15. Certification plan for safety and PRA codes

    International Nuclear Information System (INIS)

    Toffer, H.; Crowe, R.D.; Ades, M.J.

    1990-05-01

    A certification plan for computer codes used in Safety Analyses and Probabilistic Risk Assessment (PRA) for the operation of the Savannah River Site (SRS) reactors has been prepared. An action matrix, checklists, and a time schedule have been included in the plan. These items identify what is required to achieve certification of the codes. A list of Safety Analysis and Probabilistic Risk Assessment (SA ampersand PRA) computer codes covered by the certification plan has been assembled. A description of each of the codes was provided in Reference 4. The action matrix for the configuration control plan identifies code specific requirements that need to be met to achieve the certification plan's objectives. The checklist covers the specific procedures that are required to support the configuration control effort and supplement the software life cycle procedures based on QAP 20-1 (Reference 7). A qualification checklist for users establishes the minimum prerequisites and training for achieving levels of proficiency in using configuration controlled codes for critical parameter calculations

  16. Mitigation Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  17. Additional safety assessments, follow-up of stress tests of the French nuclear power stations. Action plan of the nuclear safety authority

    International Nuclear Information System (INIS)

    2012-01-01

    This document presents the French national action plan defined by the Nuclear Safety Authority (ASN) in compliance with the recommendations made by the ENSREG (European nuclear safety regulators group). It refers to decisions taken at the national level after the Fukushima accident, recommendations after European stress tests, and recommendations after the extraordinary meeting of contracting parties at the Convention on Nuclear Safety of August 2012. For different topics, this document recalls the recommendations made by the peer review, indicates the ASN's opinion and progress or ASN's requirements for different power stations. The first part addresses the recommendations made by peers and based on the European review. Topics concern natural hazards (effects, detection, inspections and controls related to earthquakes, margin assessment with respect to flooding and natural hazards), the loss of safety systems (cooling systems, electricity supplies, actions, instruments, training, and so on), the management of a severe accident (reference levels, measures, guides, exercises, training, management of contaminated water, radiation protection, premises). The second part deals with topics addressed within the frame of the Convention: national organisations, organisations in an emergency and post-accidental situation, international cooperation. A third part addresses the follow-up of additional measures issued by the ASN

  18. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-28

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the Lead Source Removal Project at the Former YS-86O Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. This plan covers the removal actions at the Former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification/confirmation sampling, grading and revegetation. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.

  19. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the Lead Source Removal Project at the Former YS-86O Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. This plan covers the removal actions at the Former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification/confirmation sampling, grading and revegetation. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects

  20. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  1. What's an Asthma Action Plan?

    Science.gov (United States)

    ... Educators Search English Español What's an Asthma Action Plan? KidsHealth / For Parents / What's an Asthma Action Plan? ... acción contra el asma? What's an Asthma Action Plan? An asthma action plan (or management plan) is ...

  2. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-24

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the removal action project at the former YS-860 Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.

  3. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the removal action project at the former YS-860 Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects

  4. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan; FINAL

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  5. Sign up to Safety: developing a safety improvement plan.

    Science.gov (United States)

    Dight, Carol; Peters, Hayley

    2015-04-01

    The Sign up to Safety (SutS) programme was launched in June 2014 by health secretary Jeremy Hunt. It focuses on listening to patients, carers and staff, learning from what they say when things go wrong, and then taking action to improve patient safety. The programme aims to make the NHS the safest healthcare system in the world by creating a culture devoted to continuous learning and improvement (NHS England 2014). Musgrove Park Hospital, part of Taunton and Somerset NHS Foundation Trust, was one of 12 NHS organisations that signed up to the SutS programme, making public its commitment to the national pledges to be 'open and transparent' and to develop a safety improvement plan. This paper describes the development of the strategy.

  6. Radiation protection challenges into the 21st century. Action planning

    International Nuclear Information System (INIS)

    Bandle, A.M.

    2000-01-01

    Building on the work undertaken by the UK Health and Safety Executive in liaison with the wider health and safety community to examine emerging technological trends and their implications for occupational health and safety, a paper was produced for the Southport '99 International Symposium which looked at the likely impact on radiation protection. This paper reports on the next phase of the work which is designed to set the agenda for regulators, duty holders, qualified experts and other key stakeholders and intermediaries. Broad trends and themes determined by phase 1 of the work are translated into action plans aimed at anticipating the key challenges and exploiting the opportunities offered by technological developments for radiation protection purposes. These might equally be to achieve improved risk assessment and exposure characterisations of uncertain or novel practices (or interventions), to promote improved design of equipment and systems of work and adoption of inherently safer processes or procedures, to raise standards of competence in key workers and managers, or to encourage greater collaboration and joined up working between different groups of stakeholders and across national boundaries. The principle purpose of sharing this vision of the future is to encourage radiation protection professionals and others with an interest in radiation and nuclear technologies, to register an interest. It will only be by engagement that the priorities and activities proposed in the action plan can be refined and only by a team effort that the implementation plan can be fully realised. And then there is the next action plan to build and tackle....(author)

  7. High-heat tank safety issue resolution program plan

    International Nuclear Information System (INIS)

    Wang, O.S.

    1993-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank (SST) 241-C-106. This program plan also outlines the logic for selecting approaches and tasks to mitigate and resolve the high-heat safety issue. The identified safety issue for high-heat tank 241-C-106 involves the potential release of nuclear waste to the environment as the result of heat-induced structural damage to the tank's concrete, if forced cooling is interrupted for extended periods. Currently, forced ventilation with added water to promote thermal conductivity and evaporation cooling is used to cool the waste. At this time, the only viable solution identified to resolve this safety issue is the removal of heat generating waste in the tank. This solution is being aggressively pursued as the permanent solution to this safety issue and also to support the present waste retrieval plan. Tank 241-C-106 has been selected as the first SST for retrieval. The program plan has three parts. The first part establishes program objectives and defines safety issues, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. Selected tasks and best-estimate schedules are also summarized in the program plan

  8. Developing Effective Corrective Action Plan in Krsko NPP

    International Nuclear Information System (INIS)

    Bach, Bruno; Cizmek, Rudi; Bozin, Bojan

    2014-01-01

    Experience shows that many events could have been prevented if lessons had been learned from previous incidents. Event reporting thus has become an increasingly important aspect of the operation and regulation of all safety-related and public health industries. Different industries such as aeronautics, chemicals, transport and of course nuclear depend on Operating Experience (OE) feedback programs to provide lessons learned about safety. The information available under an OE programme for these organizations comprises internal event reports and analysis and external operating experience including reports on low level events and near misses and other relevant operating performance information. The worldwide OE programme (such as WANO OE) in nuclear power plants provides opportunity to learn from events at other plants. In particular, it alerts plants to mistakes or events that have occurred at other nuclear power plants and enables them to take corrective actions to prevent similar occurrences at their own plant. The intent of the effective and efficient OE program is therefore to improve personnel/plant safety, reliability and commercial performance of the operating nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff and to the relevant national and international organizations and corrective actions are effectively implemented. Learning and applying the lessons from operating experience is an integral part of station safety culture and is encouraged by managers throughout the top plant administrative programs and procedures. Krsko NPP is developed its own OE program by using the most relevant INPO/WANO/IAEA guidelines as well as its own knowledge, skills an operating practice. The OE is a part of the Corrective Action Program (CAP), which is among top management programs. The purpose of this article is to present a part of the Krško NPP

  9. Status of generic actions items and safety analysis system of PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Park, Joo Hwan; Min, Byung Joo

    2001-05-01

    This report described the review results of a GAIs(Generic Action Item) currently issued on safety analysis of PHWR(Pressurized Heavy Water Reactor) and the research activities and positions to solve the GAIs in each country which possess PHWRs. eviewing the Final Safety Analysis Report for Wolsong-2/3/4 Units, the safety analysis methodology, classification for accident scenarios, safety analysis codes, their interface, etc.. were described. From the present review report, it is intended to establish the CANDU safety analysis system by providing the better understandings and development plans for the safety analysis of PHWR. esults.

  10. Savannah River Site management response plan for chemical safety vulnerability field assessment. Revision 1

    International Nuclear Information System (INIS)

    Kahal, E.J.; Murphy, S.L.; Salaymeh, S.R.

    1994-09-01

    As part of the U.S. Department of Energy's (DOE) initiative to identify potential chemical safety vulnerabilities in the DOE complex, the Chemical Safety Vulnerability Core Working Group issued a field verification assessment report. While the report concluded that Savannah River Site (SRS) is moving in a positive direction, the report also identified five chemical safety vulnerabilities with broad programmatic impact that are not easily nor quickly remedied. The May 1994 SRS Management Response Plan addressed the five SRS vulnerabilities identified in the field assessment report. The SRS response plan listed observations supporting the vulnerabilities and any actions taken or planned toward resolution. Many of the observations were resolved by simple explanations, such as the existence of implementation plans for Safety Analysis Report updates. Recognizing that correcting individual observations does not suffice in remedying the vulnerabilities, a task team was assembled to address the broader programmatic issues and to recommend corrective actions

  11. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  12. Flood action plans

    International Nuclear Information System (INIS)

    Slopek, R.J.

    1995-01-01

    Safe operating procedures developed by TransAlta Utilities for dealing with flooding, resulting from upstream dam failures or extreme rainfalls, were presented. Several operating curves developed by Monenco AGRA were described, among them the No Overtopping Curve (NOC), the Safe Filling Curve (SFC), the No Spill Curve (NSC) and the Guaranteed Fill Curve (GFC). The concept of an operational comfort zone was developed and defined. A flood action plan for all operating staff was created as a guide in case of a flooding incident. Staging of a flood action plan workshop was described. Dam break scenarios pertinent to the Bow River were developed for subsequent incorporation into a Flood Action Plan Manual. Evaluation of the technical presentations made during workshops were found them to have been effective in providing operating staff with a better understanding of the procedures that they would perform in an emergency. 8 figs

  13. St. Lawrence action plan meter

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-31

    The purpose of this bulletin is to report on the progress achieved under the St. Lawrence Action Plan. Under each of the Action Plan`s five objectives, it outlines environmental management indicators which identify actions taken and shows the results. This report presents the data collected in late August 1992 on the activities carried out by all partners of both governments involved in SLAP. The objectives examined in the bulletin are: to reduce by 90% the liquid toxic waste discharged by the 50 plants targeted for priority action; to prepare remediation plans for contaminated federal sites and restore wetlands; to conserve 5000 additional hectares of habitat and create a marine park; to develop and implement recovery plans for mammals, fish, birds, amphibians, reptiles, and plants; and to determine the state of the St. Lawrence River.

  14. Breckinridge Project, initial effort. Report VII, Volume 4. Safety and health plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    The Safety and Health Plan recognizes the potential hazards associated with the Project and has been developed specifically to respond to these risks in a positive manner. Prevention, the primary objective of the Plan, starts with building safety controls into the process design and continues through engineering, construction, start-up, and operation of the Project facilities and equipment. Compliance with applicable federal, state, and local health and safety laws, regulations, and codes throughout all Project phases is required and assured. The Plan requires that each major Project phase be thoroughly reviewed and analyzed to determine that those provisions required to assure the safety and health of all employees and the public, and to prevent property and equipment losses, have been provided. The Plan requires followup on those items or situations where corrective action needs were identified to assure that the action was taken and is effective. Emphasis is placed on loss prevention. Exhibit 1 provides a breakdown of Ashland Synthetic Fuels, Inc.'s (ASFI's) Loss Prevention Program. The Plan recognizes that the varied nature of the work is such as to require the services of skilled, trained, and responsible personnel who are aware of the hazards and know that the work can be done safely, if done correctly. Good operating practice is likewise safe operating practice. Training is provided to familiarize personnel with good operational practice, the general sequence of activities, reporting requirements, and above all, the concept that each step in the operating procedures must be successfully concluded before the following step can be safely initiated. The Plan provides for periodic review and evaluation of all safety and loss prevention activities at the plant and departmental levels.

  15. Time Based Workload Analysis Method for Safety-Related Operator Actions in Safety Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yun Goo; Oh, Eung Se [Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2016-05-15

    During the design basis event, the safety system performs safety functions to mitigate the event. The most of safety system is actuated by automatic system however, there are operator manual actions that are needed for the plant safety. These operator actions are classified as important human actions in human factors engineering design. The human factors engineering analysis and evaluation is needed for these important human actions to assure that operator successfully perform their tasks for plant safety and operational goals. The work load analysis is one of the required analysis for the important human actions.

  16. Time Based Workload Analysis Method for Safety-Related Operator Actions in Safety Analysis

    International Nuclear Information System (INIS)

    Kim, Yun Goo; Oh, Eung Se

    2016-01-01

    During the design basis event, the safety system performs safety functions to mitigate the event. The most of safety system is actuated by automatic system however, there are operator manual actions that are needed for the plant safety. These operator actions are classified as important human actions in human factors engineering design. The human factors engineering analysis and evaluation is needed for these important human actions to assure that operator successfully perform their tasks for plant safety and operational goals. The work load analysis is one of the required analysis for the important human actions.

  17. Leadership Actions to Improve Nuclear Safety Culture

    International Nuclear Information System (INIS)

    Clewett, L.K.

    2016-01-01

    The challenge many leaders face is how to effectively implement and then utilise the results of Safety Culture surveys. Bruce Power has recently successfully implemented changes to the Safety Culture survey process including how corrective actions were identified and implemented. The actions taken in response to the latest survey have proven effective with step change performance noted. Nuclear Safety is a core value for Bruce Power. Nuclear Safety at Bruce Power is based on the following four pillars: reactor safety, industrial safety, radiological safety and environmental safety. Processes and practices are in place to achieve a healthy Nuclear Safety Culture within Bruce Power such that nuclear safety is the overriding priority. This governance is based on industry leading practices which monitor, asses and take action to drive continual improvements in the Nuclear Safety Culture within Bruce Power.

  18. 7 CFR 275.16 - Corrective action planning.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which: (1...

  19. ECOWindS Joint Action Plan

    DEFF Research Database (Denmark)

    2014-01-01

    The Joint Action Plan (JAP) is a deliverable of the ECOWindS project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry. The objective of the JAP is to be an international...

  20. Analysis of the CNSC Staffs Action Plan to Reflect Lessons Learned from Fukushima Accident

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, Sangkyu; Yune, Young Gill; Ahn, Hyungjoon; Kim, Byungjik; Lee, Jinho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2014-05-15

    On September 30, 2011, the Task Force completed its review and presented the public with the findings and recommendations in the CNSC Fukushima Task Force Report. The Task Force made 13 recommendations to further enhance the safety of nuclear power plants in Canada. After that, the CNSC established the CNSC Staffs Action Plan based on the Fukushima Task Force's recommendations. In Canada, 19 nuclear power reactor units are currently producing electric power, and all of them are pressurized heavy water-reactor (PHWR) types. Also, considering 2 power reactor units in Korea, Wolsung unit 1 and 2, are the same reactor type, the analysis of the CNSC Staffs Action Plan will be of benefit to determining recommendations of Korea to address lessons learned from the Fukushima Daiichi nuclear power plant. Therefore, the CNSC Staffs Action Plan was introduced and analyzed in this study. From the results of the above analysis, it is recognized that the strengthening of defense in depth, emergency preparedness and the regulatory oversight of nuclear power plants in Canada were emphasized and much similar to practices of other countries. Public consultation process establishing the CNSC Staffs action plan has been carried out several times, in order to ensure regulatory transparency, by the CNSC staffs, and this is comparable with other countries. It is expected that the detail analysis results of the above plan will be helpful to enhance the safety of domestic operating nuclear power plants.

  1. Criteria for safety-related operator actions

    International Nuclear Information System (INIS)

    Gray, L.H.; Haas, P.M.

    1983-01-01

    The Safety-Related Operator Actions (SROA) Program was designed to provide information and data for use by NRC in assessing the performance of nuclear power plant (NPP) control room operators in responding to abnormal/emergency events. The primary effort involved collection and assessment of data from simulator training exercises and from historical records of abnormal/emergency events that have occurred in operating plants (field data). These data can be used to develop criteria for acceptability of the use of manual operator action for safety-related functions. Development of criteria for safety-related operator actions are considered

  2. Clarification of TMI action plan requirements. Technical report

    International Nuclear Information System (INIS)

    1980-11-01

    This document, NUREG-0737, is a letter from D.G. Eisenhut, Director of the Division of Licensing, NRR, to licensees of operating power reactors and applicants for operating licenses forwarding post-TMI requirements which have been approved for implementation. Following the accident at Three Mile Island Unit 2, the NRC staff developed the Action Plan, NUREG-0660, to provide a comprehensive and integrated plan to improve safety at power reactors. Specific items from NUREG-0660 have been approved by the Commission for implementation at reactors. In this NRC report, these specific items comprise a single document which includes additional information about schedules, applicability, method of implementation review, submittal dates, and clarification of technical positions. It should be noted that the total set of TMI-related actions have been collected in NUREG-0660, but only those items that the Commission has approved for implementation to date are included in this document, NUREG-0737

  3. Solar heating action plan; Solvarme handlingsplan

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Jan Erik

    2011-10-15

    This solar action plan should be seen as a follow-up to the Danish Energy Agency's solar heating strategy from 2007, which showed great potential and opportunities for exploitation and use of solar heat in Denmark. In relation to the strategy from 2007, this action plan adjusted the distribution of solar heat from district heating plants and individual plants, but it is still the objective of this action plan to achieve the strategy's overall goal for 2030. With the implementation of the Action Plan in early 2012, it is estimated that in 2030 there will be about. 10 million m2 of solar collectors in operation, 8 million m2 for district heating and 2 million m2 for individual heating, equivalent to an installed capacity totaling 7 GW. The budget for actions in the Action Plan is about 80 million DKK annually over the next 5 years to initiate and ensure this development. (LN)

  4. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  5. Updated action plan for the implementation of measures as a consequence of the Fukushima reactor accident

    International Nuclear Information System (INIS)

    2014-01-01

    The action plan of the German government concerning the measures following the Fukushima reactor accident include the decision on the future of nuclear power in Germany, safety analyses, investigations and measures for nuclear power plants in a national frame, investigations in an international frame, planning for the implementation of CNS (Convention on nuclear safety) topics 1-3, i.e. measures to increase the robustness in German nuclear power plants, and the planning of implementation of further measures (CNS topics 4-6).

  6. Climate Action Planning Tool | NREL

    Science.gov (United States)

    NREL's Climate Action Planning Tool provides a quick, basic estimate of how various technology options can contribute to an overall climate action plan for your research campus. Use the tool to Tool Calculation Formulas and Assumptions Climate Neutral Research Campuses Website Climate Neutral

  7. 78 FR 61251 - The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and...

    Science.gov (United States)

    2013-10-03

    ...-0030] RIN 2132-AB20; 2132-AB07 The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and the Public Transportation Safety Certification Training Program; Transit... Public Transportation Safety Program (National Safety Program) and the requirements of the new transit...

  8. Health and safety plan for characterization sampling of ETR and MTR facilities

    International Nuclear Information System (INIS)

    Baxter, D.E.

    1994-10-01

    This health and safety plan establishes the procedures and requirements that will be used to minimize health and safety risks to persons performing Engineering Test Reactor and Materials Test Reactor characterization sampling activities, as required by the Occupational Safety and Health Administration standard, 29 CFR 1910.120. It contains information about the hazards involved in performing the tasks, and the specific actions and equipment that will be used to protect persons working at the site

  9. Safety case plan 2008

    International Nuclear Information System (INIS)

    2008-07-01

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. In 2005, Posiva presented a plan to prepare such a safety case. The present report provides a revised plan of the safety case contents mentioned above. The update of the safety case plan takes into account the recommendations made by the Radiation and Nuclear Safety Authority (STUK) about improving the focus and further developing the plan. Accordingly, particular attention is given to the quality management of the safety case work, the management of uncertainties and the scenario methodology. The quality management is based on the ISO 9001:2000 standard process thinking enhanced with special features arising from STUK's YVL Guides. The safety case production process is divided into four main sub-processes. The conceptualisation and methodology sub-process defines the framework for the assessment. The critical data handling and modelling sub-process links Posiva's main technical and scientific activities to the production of the safety case. The assessment sub-process analyses the consequences of the evolution of the disposal system in various scenarios, classified either as part of the expected evolution or as disruptive scenarios. The compliance and confidence sub-process is responsible for final evaluation of compliance of the assessment results with the regulatory criteria and the overall confidence in the safety case. As in the previous safety case plan, the safety case will be based on several reports, but

  10. Intelligent robot action planning

    Energy Technology Data Exchange (ETDEWEB)

    Vamos, T; Siegler, A

    1982-01-01

    Action planning methods used in intelligent robot control are discussed. Planning is accomplished through environment understanding, environment representation, task understanding and planning, motion analysis and man-machine communication. These fields are analysed in detail. The frames of an intelligent motion planning system are presented. Graphic simulation of the robot's environment and motion is used to support the planning. 14 references.

  11. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  12. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    International Nuclear Information System (INIS)

    A. M. Tyson

    2006-01-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project

  13. Operator Actions Within a Safety Instrumented Function

    International Nuclear Information System (INIS)

    Suttinger, L.T.

    2002-01-01

    This paper presents an overview of the factors that should be considered when crediting operator action for performing a safety function or being a part of the process of enabling a safety function. Criteria for evaluating operator action, such as required time response and operator training among others, are discussed. The paper will address these and other factors that should be considered when determining the reliability of the operator to respond and perform his/her part of the safety function. The entire safety function includes the operator and the reliability of the instrumented system that provides the alarm or indication, the final control element, and support systems. The integration of the operator performance with the hardware safety availability, including the effects of the supporting systems is discussed. The analysis of these factors will provide the justification for the amount of risk reduction or safety integrity level that can be credited for the Safety Instrumented Function (SIF), including operator action

  14. Effects of action planning and coping planning within the theory of planned behaviour

    DEFF Research Database (Denmark)

    Pakpour, Amir H.; Zedi, Isa mohammadi; Chatzisarantis, Nikos

    2011-01-01

    Objective: Patients on dialysis have low physical activity levels. The aim of the study was to examine the validity of action planning and coping planning within the theory of planned behaviour framework, for predicting physical activity behaviour of patients on hemodialysis. Methods: One hundred...... and forty four patients who were undergoing emodialysis were selected from dialysis centers. The mean age of the patients was 56.61 (SD= 11.38) years. The patients completed a questionnaire including variables from the theory of planned behaviour, action planning and coping planning. Physical activity...... was prospectively assessed at 4-weeks with the validated International Physical Activity Questionnaire self-report measure. A hierarchical regression analysis was performed to examine the effects of action planning and coping planning on physical activity behaviour. Results: There was a main effect for coping...

  15. Safety evaluation report on Tennessee Valley Authority: Watts Bar Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1990-01-01

    This safety evaluation report on the information submitted by the Tennessee Valley Authority in its Nuclear Performance Plan for the Watts Bar Nuclear Plant and in supporting documents has been prepared by the US Nuclear Regulatory Commission staff. The plan addresses the plant-specific corrective actions as part of the recovery program for licensing of Unit 1. The staff will be monitoring and inspecting the implementation of the programs. The plan does not address all licensing matters that will be required for fuel load and operation of Unit 1. Those remaining licensing matters have been addressed in previous safety evaluations or will be addressed in accordance with routing NRC licensing practices. 97 refs

  16. UMTRA project office federal employee occupational safety and health program plan

    International Nuclear Information System (INIS)

    1994-06-01

    This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES ampersand H) Plan (DOE, 1992), which establishes the basic programmatic ES ampersand H requirements for all participants on the UMTRA Project. The ES ampersand H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES ampersand H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES ampersand H program and covers only federal employees working on the UMTRA Project

  17. Safety evaluation report on Tennessee Valley Authority: Browns Ferry Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1991-01-01

    This safety evaluation report (SER) was prepared by the US Nuclear Regulatory Commission (NRC) staff and represents the second and last supplement (SSER 2) to the staff's original SER published as Volume 3 of NUREG-1232 in April 1989. Supplement 1 of Volume 3 of NUREG-1232 (SSER 1) was published in October 1989. Like its predecessors, SSER 2 is composed of numerous safety evaluations by the staff regarding specific elements contained in the Browns Ferry Nuclear Performance Plan (BFNPP), Volume 3 (up to and including Revision 2), submitted by the Tennessee Valley Authority (TVA) for the Browns Ferry Nuclear Plant (BFN). The Browns Ferry Nuclear Plant consists of three boiling-water reactors (BWRs) at a site in Limestone County, Alabama. The BFNPP describes the corrective action plans and commitments made by TVA to resolve deficiencies with its nuclear programs before the startup of Unit 2. The staff has inspected and will continue to inspect TVA's implementation of these BFNPP corrective action plans that address staff concerns about TVA's nuclear program. SSER 2 documents the NRC staff's safety evaluations and conclusions for those elements of the BFNPP that were not previously addressed by the staff or that remained open as a result of unresolved issues identified by the staff in previous SERs and inspections

  18. High-heat tank safety issue resolution program plan. Revision 2

    International Nuclear Information System (INIS)

    Wang, O.S.

    1994-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank 241-C-106. The heat source of approximately 110,000 Btu/hr is the radioactive decay of the stored waste material (primarily 90 Sr) inadvertently transferred into the tank in the later 1960s. Currently, forced ventilation, with added water to promote thermal conductivity and evaporation cooling, is used for heat removal. The method is very effective and economical. At this time, the only viable solution identified to permanently resolve this safety issue is the removal of heat-generating waste in the tank. This solution is being aggressively pursued as the only remediation method to this safety issue, and tank 241-C-106 has been selected as the first single-shell tank for retrieval. The current cooling method and other alternatives are addressed in this program as means to mitigate this safety issue before retrieval. This program plan has three parts. The first part establishes program objectives and defines safety issue, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and other alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. A table of best-estimate schedules for the key tasks is also included in this program plan

  19. Environment, safety, and health regulatory implementation plan

    International Nuclear Information System (INIS)

    1993-01-01

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project's environment, safety, and health (ES ampersand H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project's regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES ampersand H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status

  20. Climate Action Planning Process | Climate Neutral Research Campuses | NREL

    Science.gov (United States)

    Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and

  1. From action planning and plan enactment to fruit consumption: moderated mediation effects.

    Science.gov (United States)

    Kasten, Stefanie; van Osch, Liesbeth; Eggers, Sander Matthijs; de Vries, Hein

    2017-10-23

    Sufficient fruit consumption is beneficial for a healthy live. While many Dutch adults intent to eat the recommended amount of fruit, only 5-10% of the population actually adheres to the recommendation. One mechanism that can help to narrow this gap between intention and actual fruit consumption is action planning. However, action planning is only assumed to be effective if plans are enacted. This study assessed which action plans are made and enacted, and further aimed to investigate two main hypotheses: 1. the effect of action planning (at T1) on fruit consumption (at T2) is mediated by plan enactment (at T3); 2. positive intentions (2a), high self-efficacy (2b) and a strong habit to eat fruit (2c) enhance the mediation of plan enactment, whereas a strong habit to eat snacks (2d) hinders the mediation of plan enactment. This study was a self-reported longitudinal online survey study. A total of 428 participants filled in a survey, measuring demographic factors (e.g. gender, age, education level), several socio-cognitive constructs (i.e. attitudes, self-efficacy, habit, action planning, plan enactment), and fruit consumption, at three points in time (baseline, after 1 month, and after 3 months). Mediation and moderated mediation analyses were used to investigate the planning-plan enactment- fruit consumption relationship. Up to 70% of the participants reported to have enacted their T1 action plans at T2. Action planning on fruit consumption was fully mediated by plan enactment (Hypothesis 1). All four proposed moderators (i.e. intention, self-efficacy, habit to consume fruit, and habit to consume snacks) significantly influenced the mediation (Hypotheses 2a-2d). Mediation of plan enactment was only present with high levels of intention, high levels of self-efficacy, strong habits to eat fruit, and weak habits to eat snacks. The study suggests the importance of plan enactment for fruit consumption. Furthermore, it emphasizes the necessity of facilitating factors

  2. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, H.T.

    1998-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP). This MAPAR provides a status on specific DARHT facility design- and construction-related mitigation actions that have been initiated in order to fulfill DOE`s commitments under the DARHT MAP. The functions of the DARHT MAP are to (1) document potentially adverse environmental impacts of the Phased Containment Option delineated in the Final EIS, (2) identify commitments made in the Final EIS and ROD to mitigate those potential impacts, and (3) establish Action Plans to carry out each commitment (DOE 1996). The DARHT MAP is divided into eight sections. Sections 1--5 provide background information regarding the NEPA review of the DARHT project and an introduction to the associated MAP. Section 6 references the Mitigation Action Summary Table which summaries the potential impacts and mitigation measures; indicates whether the mitigation is design-, construction-, or operational-related; the organization responsible for the mitigation measure; and the projected or actual completion data for each mitigation measure. Sections 7 and 8 discuss the Mitigation Action Plan Annual Report and Tracking System commitment and the Potential Impacts, Commitments, and Action Plans respectively. Under Section 8, potential impacts are categorized into five areas of concern: General Environment, including impacts to air and water; Soils, especially impacts affecting soil loss and contamination; Biotic Resources, especially impacts affecting threatened and endangered species; Cultural/Paleontological Resources, especially impacts affecting the archeological site known as Nake`muu; and Human Health and Safety, especially impacts pertaining to noise and radiation. Each potential impact includes a brief statement of the nature of the impact and its cause(s). The commitment

  3. Blood alcohol test results of motor vehicle deaths as an evaluation method for the Fairfax Alcohol Safety Action Project.

    Science.gov (United States)

    1973-01-01

    The Fairfax Alcohol Safety Action Project (ASAP) was started following the June 1971 approval of the proposal and working plan submitted to the Department of Transportation by the Highway Safety Division of Virginia. A total of $2,123,000 was allocat...

  4. American Samoa Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Haase, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Esterly, Sean [National Renewable Energy Lab. (NREL), Golden, CO (United States); Herdrich, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bodell, Tim [National Renewable Energy Lab. (NREL), Golden, CO (United States); Visser, Charles [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  5. Asthma action plan

    OpenAIRE

    Public Health Agency

    2014-01-01

    This action plans allow each child (or parent/carer) to record his or her asthma treatment to help manage their asthma when they are well, when their symptoms get worse and when they are suffering an asthma attack.

  6. 'Action 2016': AREVA's strategic action plan to improve performance

    International Nuclear Information System (INIS)

    Marie, Patricia; Floquet-Daubigeon, Fleur; Michaut, Maxime; De Scorbiac, Marie; Du Repaire, Philippine

    2011-01-01

    On December 12, 2011, Luc Oursel, Executive Officer of AREVA, and Pierre Aubouin, Chief Financial Executive Officer, presented the group's 'Action 2016' strategic action plan based on an in-depth analysis of the market's outlook. This document makes, first, a Detailed presentation of the 'Action 2016' plan and then presents the group's financial outlook: - Full-year 2011 immediate accounting consequences of the new market environment: operating losses expected in 2011; - 2012-2013 transition period Objective: self-finance capex in cumulative terms; - 2014-2016: safe growth and cash generation, free operating cash flow at break-even beginning in 2013, above euro 1 bn per year beginning in 2015

  7. A tailored online safety and health intervention for women experiencing intimate partner violence: the iCAN Plan 4 Safety randomized controlled trial protocol

    Directory of Open Access Journals (Sweden)

    Marilyn Ford-Gilboe

    2017-03-01

    Full Text Available Abstract Background Intimate partner violence (IPV threatens the safety and health of women worldwide. Safety planning is a widely recommended, evidence-based intervention for women experiencing IPV, yet fewer than 1 in 5 Canadian women access safety planning through domestic violence services. Rural, Indigenous, racialized, and immigrant women, those who prioritize their privacy, and/or women who have partners other than men, face unique safety risks and access barriers. Online IPV interventions tailored to the unique features of women’s lives, and to maximize choice and control, have potential to reduce access barriers, and improve fit and inclusiveness, maximizing effectiveness of these interventions for diverse groups. Methods/Design In this double blind randomized controlled trial, 450 Canadian women who have experienced IPV in the previous 6 months will be randomized to either a tailored, interactive online safety and health intervention (iCAN Plan 4 Safety or general online safety information (usual care. iCAN engages women in activities designed to increase their awareness of safety risks, reflect on their plans for their relationships and priorities, and create a personalize action plan of strategies and resources for addressing their safety and health concerns. Self-reported outcome measures will be collected at baseline and 3, 6, and 12 months post-baseline. Primary outcomes are depressive symptoms (Center for Epidemiological Studies Depression Scale, Revised and PTSD Symptoms (PTSD Checklist, Civilian Version. Secondary outcomes include helpful safety actions, safety planning self-efficacy, mastery, and decisional conflict. In-depth qualitative interviews with approximately 60 women who have completed the trial and website utilization data will be used to explore women’s engagement with the intervention and processes of change. Discussion This trial will contribute timely evidence about the effectiveness of online safety and

  8. 78 FR 43091 - Technical Operations Safety Action Program (T-SAP) and Air Traffic Safety Action Program (ATSAP)

    Science.gov (United States)

    2013-07-19

    ... Administration 14 CFR Part 193 [Docket No.: FAA-2013-0375] Technical Operations Safety Action Program (T-SAP) and... Disclosure. SUMMARY: The FAA is proposing that safety information provided to it under the T-SAP, established... to the FAA under the T-SAP and ATSAP, so the FAA can learn about and address aviation safety hazards...

  9. RPII Action Plan

    International Nuclear Information System (INIS)

    2011-03-01

    This document outlines RPII's committments under the Public Service Action Plan 2010 to 2014, otherwise known as the Croke Park Agreement. The document describes the proposed changes to the workplan, the benefits arising from the changes and the timeframe for implementing the committments

  10. Failed fuel action plan guidelines: Special report

    International Nuclear Information System (INIS)

    1987-11-01

    The objective of this document is to provide a generic guideline that can be used to formulate a failed fuel action plan (FFAP) for specific application by a utility. This document is intended to be part of a comprehensive fuel reliability monitoring, management, and improvement program. The utilities may utilize this document as one resource in developing a failed fuel action plan. This document is not intended to be used as a failed fuel action plan standard. This document is intended to provide guidance on: management responsibilities; fuel performance parameters; cost/benefit analysis; action levels; long-term improvement methods; and data collection, analysis, and trending. 3 refs., 4 figs., 6 tabs

  11. What contributes to action plan enactment? Examining characteristics of physical activity plans.

    Science.gov (United States)

    Fleig, Lena; Gardner, Benjamin; Keller, Jan; Lippke, Sonia; Pomp, Sarah; Wiedemann, Amelie U

    2017-11-01

    Individuals with chronic conditions can benefit from formulating action plans to engage in regular physical activity. However, the content and the successful translation of plans into action, so-called plan enactment, are rarely adequately evaluated. The aim of this study was to describe the content of user-specified plans and to examine whether participants were more likely to enact their plans if these plans were highly specific, viable, and instrumental. The study presents secondary analyses from a larger behavioural intervention in cardiac and orthopaedic rehabilitation. The content of 619 action plans from 229 participants was evaluated by two independent raters (i.e., qualitative analyses and ratings of specificity) and by participants themselves (i.e., instrumentality and viability). Plan enactment was also measured via self-reports. Multilevel analyses examined the relationship between these plan characteristics and subsequent plan enactment, and between plan enactment and aggregated physical activity. Participants preferred to plan leisure-time physical activities anchored around time-based cues. Specificity of occasion cues (i.e., when to act) and highly instrumental plans were positively associated with plan enactment. Interestingly, individuals who planned less specific behavioural responses (i.e., what to do) were more likely to enact their plans. Plan enactment was positively associated with aggregated behaviour. Interventions should not only emphasize the importance of planning, but also the benefits of formulating specific contextual cues. Planning of the behavioural response seems to require less precision. Allowing for some flexibility in executing the anticipated target behaviour seems to aid successful plan enactment. Statement of Contribution What is already known on this subject? Action planning interventions are efficacious in promoting health behaviour. Characteristics of plan content (i.e., specificity) matter for unconditional behaviour

  12. Action understanding as inverse planning.

    Science.gov (United States)

    Baker, Chris L; Saxe, Rebecca; Tenenbaum, Joshua B

    2009-12-01

    Humans are adept at inferring the mental states underlying other agents' actions, such as goals, beliefs, desires, emotions and other thoughts. We propose a computational framework based on Bayesian inverse planning for modeling human action understanding. The framework represents an intuitive theory of intentional agents' behavior based on the principle of rationality: the expectation that agents will plan approximately rationally to achieve their goals, given their beliefs about the world. The mental states that caused an agent's behavior are inferred by inverting this model of rational planning using Bayesian inference, integrating the likelihood of the observed actions with the prior over mental states. This approach formalizes in precise probabilistic terms the essence of previous qualitative approaches to action understanding based on an "intentional stance" [Dennett, D. C. (1987). The intentional stance. Cambridge, MA: MIT Press] or a "teleological stance" [Gergely, G., Nádasdy, Z., Csibra, G., & Biró, S. (1995). Taking the intentional stance at 12 months of age. Cognition, 56, 165-193]. In three psychophysical experiments using animated stimuli of agents moving in simple mazes, we assess how well different inverse planning models based on different goal priors can predict human goal inferences. The results provide quantitative evidence for an approximately rational inference mechanism in human goal inference within our simplified stimulus paradigm, and for the flexible nature of goal representations that human observers can adopt. We discuss the implications of our experimental results for human action understanding in real-world contexts, and suggest how our framework might be extended to capture other kinds of mental state inferences, such as inferences about beliefs, or inferring whether an entity is an intentional agent.

  13. Oak Ridge National Laboratory Environmenal, Safety, and Health Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The 1990 Tiger Team Appraisal of Oak Ridge National Laboratory (ORNL) revealed that neither Martin Marietta Energy Systems, Inc. (Energy Systems) nor ORNL had a strategic plan for Environmental, Safety, and Health (ES ampersand H) activities. There were no detailed plans describing ORNL's mission, objectives, and strategies for ES ampersand H activities. A number of plans do exist that cover various aspects of ES ampersand H. Their scope ranges from multiyear program plans to annual audit schedules to compliance plans to action plans from specific audits. However, there is not a single document that identifies the plans and the objectives they are to address. This document describes the strategic plan for ORNL and provides the linkage among existing plans. It gives a brief description of the organization and management of ES ampersand H activities at ORNL. The plan identifies the general strategies to be taken by ORNL, using the overall guidance from Energy Systems in its corporate ES ampersand H Strategic Plan. It also identifies more detailed plans for implementation of these strategies, where appropriate

  14. Practical application of the International Safety Regime in NW Russia: experience from the Norwegian plan of action

    International Nuclear Information System (INIS)

    Sneve, Malgorzata K.; Kiselev, Mikhail; Kochetkov, Oleg; Shandala, Natalya; Smith, Graham

    2008-01-01

    Full text: The Norwegian Radiation Protection Authority (NRPA) and the Federal Medical-Biological Agency (FMBA) of the Russian Federation have a collaboration programme which forms part of the Norwegian government's Plan of Action to improve radiation and nuclear safety in Northwest Russia. The programme seeks to support an efficient and effective regulatory supervision process over the management of the nuclear legacy, taking account of the Russian regulatory framework but also taking advantage of recommendations and guidance from the evolving international safety regime. This paper will present the substantial advances made within that programme, describing on-going progress within specific projects and setting out the value arising from wider involvement in the programme of other organisations such as the IAEA and NATO, as well as the technical support derived from other national agencies and technical organisations. This has been the first opportunity for such international regulatory interaction at the operational level. Specific projects are concerned with the management of the nuclear legacy in Northwest Russia. These include the remediation of previous military facilities, and related spent fuel and radioactive waste management, at the Shore Technical Bases (now designated as Sites of Temporary Storage) at Andreeva Bay and Gremikha. New regulatory guidance documents have been developed, involving major technical inputs from the State Research Centre-Institute of Biophysics, as well as review and advice on relevant good practice in other countries provided by other technical support organisations. Current projects due to complete in 2007 and to be reported upon in the full paper involve development of new regulatory guidance on Very Low-Level Waste management, specifically for the licensing and operation of new VLLW disposal facilities; optimisation of operational radiation protection during remediation, particularly in areas of high ambient radiation dose

  15. Maine highway safety plan

    Science.gov (United States)

    2010-01-01

    Each September 1, the MeBHS must provide NHTSA a comprehensive plan to reduce : traffic crashes and resulting deaths, injuries and property damage. The Highway Safety : Plan (HSP) serves as Maines application for available federal funds for these ...

  16. Implementing the Climate Action Plan | Climate Neutral Research Campuses |

    Science.gov (United States)

    considerations for building a portfolio, including: Compatibility with organizational mission: All climate NREL Implementing the Climate Action Plan Implementing the Climate Action Plan When implementing climate action plans on research campuses, two important and related questions must be answered

  17. The Danish Organic Action Plan 2020

    DEFF Research Database (Denmark)

    Sørensen, Nina Nørgaard; Lassen, Anne Dahl; Løje, Hanne

    2015-01-01

    Objective With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food...... procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Design Comparison study measuring organic food procurement by applying two different methods, one based on the use...... organic food conversion projects funded by the Danish Organic Action Plan 2020 during 2012 and 2013. Subjects Twenty-six public kitchens (comparison study) and 345 public kitchens (baseline organic food procurement status). Results A high significant correlation coefficient was found between the two...

  18. Fusion safety program plan

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.; Herring, J.S.

    1980-09-01

    The program plan consists of research that has been divided into 13 different areas. These areas focus on the radioactive inventories that are expected in fusion reactors, the energy sources potentially available to release a portion of these inventories, and analysis and design techniques to assess and ensure that the safety risks associated with operation of magnetic fusion facilities are acceptably low. The document presents both long-term program requirements that must be fulfilled as part of the commercialization of fusion power and a five-year plan for each of the 13 different program areas. Also presented is a general discussion of magnetic fusion reactor safety, a method for establishing priorities in the program, and specific priority ratings for each task in the five-year plan

  19. NIF special equipment construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Sawicki, R.H.

    1997-07-28

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES&H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan.

  20. NIF special equipment construction health and safety plan

    International Nuclear Information System (INIS)

    Sawicki, R.H.

    1997-01-01

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES ampersand H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan

  1. Meeting the management challenges of the Decade of Action for Road Safety

    Directory of Open Access Journals (Sweden)

    Tony Bliss

    2012-03-01

    Full Text Available In low- and middle-income countries, the high price paid for mobility in terms of human loss and suffering is forecast to rise to unprecedented levels. More than 50 million deaths and 500 million serious injuries on the world's roads can be projected with some certainty over the first 50 years of the 21st century, unless sustained new initiatives are taken. This paper addresses the emergence of road safety as a development priority over the last decade and the management challenges facing the planned global response aimed at bringing road safety outcomes in developing countries under control. It outlines the decade of advocacy that created the UN Decade of Action for Road Safety 2011–2020 and related Global Plan, and highlights the concern that over the coming decade low and middle income countries will face considerable management challenges in successfully implementing related measures and sustaining their delivery. The paper discusses new road safety management tools that have been developed by the World Bank and ISO to provide assistance to countries and organizations within an integrated framework that ensures that measures taken are properly sequenced and adjusted to their absorptive and learning capacities. It concludes that strengthened institutions and the accelerated knowledge creation and transfer central to this, plus scaled-up investment and increased international cooperation and development aid are critical to the successful achievement of the Global Plan's ambitious goal.

  2. Environmental health action plan for Europe

    International Nuclear Information System (INIS)

    1994-06-01

    This Environmental Health Action Plan for Europe was endorsed by the second European Conference on Environment and Health, held in Helsinki, 20 to 22 June 1994. It sets out directions for the attainment of long term environment and health policy objectives define in the European Charter on Environment and Health. The Action Plan is primarily addressed at the public health and environmental protection sectors. 10 refs, 4 figs, 2 tabs

  3. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2011-09-01

    The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclear explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of

  4. Chemical Hygiene and Safety Plan

    Energy Technology Data Exchange (ETDEWEB)

    Berkner, K.

    1992-08-01

    The objective of this Chemical Hygiene and Safety Plan (CHSP) is to provide specific guidance to all LBL employees and contractors who use hazardous chemicals. This Plan, when implemented, fulfills the requirements of both the Federal OSHA Laboratory Standard (29 CFR 1910.1450) for laboratory workers, and the Federal OSHA Hazard Communication Standard (29 CFR 1910.1200) for non-laboratory operations (e.g., shops). It sets forth safety procedures and describes how LBL employees are informed about the potential chemical hazards in their work areas so they can avoid harmful exposures and safeguard their health. Generally, communication of this Plan will occur through training and the Plan will serve as a the framework and reference guide for that training.

  5. American Samoa: Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ness, J. Erik [National Renewable Energy Lab. (NREL), Golden, CO (United States); Haase, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Conrad, Misty [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    This document outlines actions being taken to reduce American Samoa's petroleum consumption. It describes the four near-term strategies selected by the American Samoa Renewable Energy Committee during action-planning workshops conducted in May 2016, and describes the steps that will need to be taken to implement those strategies.

  6. Proceedings of the Radon national action plan workshop

    International Nuclear Information System (INIS)

    Chevet, Pierre-Franck; Godet, Jean-Luc; Tirmarche, Margot; Strand, Per; Mrdakovic Popic, Jelena; Dysvik, Solveig; Skjold, Anne Marit; Vallet, Benoit; Van Deventer, Emilie; Colgan, Tony; ); Mundigl, Stefan; ); Magnusson, S.; Long, Bill; McBurney, Ruth; Thompson, P.A; Pollard, David; Fenton, David; Long, Stephanie; Dehandschutter, Boris; Murith, Christophe; Skeppstroem, Kirlna; Petrova, Karla; Davidkova, Jana; Pravdova, Eva; Kiselev, Sergey; Mc Coll, Neil; Vallet, Jeremie; Rannou, Alain; Kurttio, Paivi; Martinsen, Finn; Roulet, Claude-Alain; Goyette, Joelle; Frutos, Borja; Olaya, Manuel; Linares Alemparte, Pilar; Marinko, Janez; Garcia-Talavera, Marta; Pedrazzi, Lisa; Mc Laughlin, James; Gutierrez-Villanueva, Jose-Luis; Janssens, Augustin

    2015-01-01

    Following the publication of the new European Basic Safety Standards Directive (the Council Directive 2013/59/EURATOM ), published in January 2014, Member States of the European Union have 4 years to incorporate it and to prepare or update their strategy for reducing radon concentration and the associated national radon action plan. Under a joint initiative from ASN and NRPA, 20 European countries, represented by authorities in charge of Radiation Protection, Health, Labour and Housing and Landscaping were brought together during a workshop on national radon action plans. The objective of the workshop, held in ASN's premises, was to share the views and experiences concerning national strategies for reducing radon exposure of the population and associated lung cancer risk. The radon workshop was supported by the World Health Organisation (WHO), the International Atomic Energy Agency (IAEA), the Heads of European Radiation protection Control Authorities (HERCA) and the European Commission (EC). Authorities from USA (EPA, CRCPD), Canada (CNSC) and Russia (FMBA) and the European Radon Association (ERA) also participated in the workshop. This radon workshop has offered the opportunity to compare the actions in place or in preparation in different countries aiming at reducing radon exposure in home and dwellings, in buildings with public access (i.e. schools) and in workplaces. Preventive and corrective solutions, associated with incentives and communication to increase the public awareness, as well as education and training actions for different actors concerned, have been presented and discussed. The question about the relative place of regulation in the national strategy has been considered as an important key point. This document brings together the presentations (slides) given at the workshop. The main conclusions of the workshop are presented at the end of the document

  7. ECOWindS Joint Action Plan - Guidelines for Implementation

    DEFF Research Database (Denmark)

    2015-01-01

    The Joint Action Plan (JAP) is a deliverable of the European Clusters for Offshore Wind Servicing (ECOWindS) project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry. Th...

  8. 29 CFR 1918.100 - Emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... action plans. (a) Scope and application. This section requires all employers to develop and implement an... departments that can be contacted for further information or explanation of duties under the plan. (c) Alarm... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work...

  9. Think over nuclear safety. ''Information asymmetry'' and ''comminicative action''

    International Nuclear Information System (INIS)

    Suzuki, Atsuyuki

    2006-01-01

    Nuclear safety should be fully understood not only technically but also socially. In order to think over nuclear safety socially, four different concepts were recommended to refer, which were ''procedural rationality'', information asymmetry'', ''certainty effect'' and ''communicative action'' proposed by three economists and a philosopher respectively. Risk-based communication approach for nuclear safety could be effective within the higher frequency area than safety goal, but not good for the lower frequency area than safety goal. The latter could be highly subjective and more qualitative. For this area, ''safety communication'' would be highly maintained with taking account of existence of ''information asymmetry'' and need of ''communicative action''. (T.Tanaka)

  10. Energy efficiency action plan. Policy action plan for promotion of energy efficiency in the Czech Republic to 2010

    International Nuclear Information System (INIS)

    1999-08-01

    Energy efficiency and renewable energy production contribute to the three major goals of the national energy policy of the Czech Republic: overall competitiveness, security of supply and environmental protection. Therefore, the Czech government aims to promote these two sustainable options. The Energy Policy White Paper, which is being developed at the time of writing (June 1999), will provide the general framework for the future role of energy efficiency and renewable energy in the Czech Republic. In addition, it is necessary to develop specific policies. The National Energy Efficiency Study aimed to support the Czech government in the formulation of energy efficiency and renewable energy policy. The National Energy Efficiency Study has resulted in the following documents: (1) The Energy Efficiency Action Plan focuses on promotion of energy efficiency in end-use (this report); The Renewable Energy Action Plan (separate report; ECN-C--99-064) deals with policy on promotion of renewable energy production. These two Action Plans provide policy makers in the Czech government with essential information on potentials, targets, budgets and recommended policy instruments. The core of the Action Plans is the list of concrete policy actions, ready for implementation; and (2) The National Energy Efficiency Study NEES (separate report; ECN-C--99-063). This report is the background document to the two Action Plans. It contains detailed information on options and measures, potentials, barriers and policy instruments for energy efficiency and renewables. The main part is a detailed outline for a new energy efficiency and renewable policy. Also, it includes recommendations for financing schemes to overcome the investment constraints in the Czech Republic. Finally, a list of concrete projects is included to support project identification

  11. Renewable energy action plan. Policy action plan for promotion of renewable energy in the Czech Republic to 2010

    International Nuclear Information System (INIS)

    1999-08-01

    Energy efficiency and renewable energy production contribute to the three major goals of the national energy policy of the Czech Republic: overall competitiveness, security of supply; and environmental protection. Therefore, the Czech government promotes these two sustainable options. The Energy Policy White Paper, which is being developed at the time of writing (June 1999), will provide the general framework for the future role of energy efficiency and renewable energy in the Czech Republic. However, in addition, it is necessary to develop specific policies. The National Energy Efficiency Study aimed to support the Czech government in the formula tion of energy efficiency and renewable energy policy. The National Energy Efficiency Study has resulted in the following documents: (1) The Renewable Energy Action Plan (this report) addresses renewable energy production. The Energy Efficiency Action Plan focuses on the promotion of energy efficiency in end use (separate report; ECN-C--99-065). These two Action Plans provide policy makers in the Czech government with information on potentials, targets, budgets and recommended policy instruments. The core of the Action Plans is the list of concrete policy actions, ready for implementation; (2) The National Energy Efficiency Study NEES (separate report; ECN-C--99-063). This report is the background document to the two Action Plans. It contains detailed information on options and measures, potentials, barriers and policy instruments for energy efficiency and renewables. The main part is a detailed outline for a new energy efficiency and renewable policy. Also, it includes recommendations for financing schemes to overcome the invest ment constraints in the Czech Republic. Finally, a list of concrete projects is included to support project identification

  12. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  13. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  14. Friends Partnership Mentoring Program Action Plan

    Data.gov (United States)

    Department of the Interior — This Action Plan has been prepared to support Recommendation 11 of the U.S. Fish and Wildlife Service Refuge System’s “Conserving the Future”. The plan outlines a...

  15. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action

    Directory of Open Access Journals (Sweden)

    Sanjeev Sridharan

    2016-09-01

    Full Text Available Background: Mainstreaming of gender, equity, and human rights (GER is an important focus of the World Health Organization (WHO and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design: A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results: GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions: Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations.

  16. Task Action Plans for generic activities: Category A

    International Nuclear Information System (INIS)

    1978-10-01

    The document contains listings of generic technical activities as identified and placed in priority categories by the Office of Nuclear Reactor Regulation (NRR). In addition, it contains definitions of Priority Categories A, B, C, and D and copies of forty approved Task Action Plans for Category A activites. Problem Descriptions for the Category B, C and D tasks are contained in NUREG--0471. This material was developed within the context of NRR's Program for the Resolution of Generic Issues Related to Nuclear Power Plants. As part of this program, the assignment of identified issues to priority categories and the approval of Task Action Plans were made by NRR's Technical Activities Steering Committee, chaired by the Deputy Director, NRR. The original document was published in November 1977. In December 1977 it was updated to add the Task Action Plan for Task No. A-17, Systems Interactions in Nuclear Power Plants. This update adds Task Action Plans for Tasks A-13, A-18, A-21, A-22, A-32, A-37, A-38 and A-40. Task A-41 has been included in Task A-40. In addition, as part of this update, the following changes were made to each Task Action Plan (with the exception of the Task Action Plan for Task A-9): (1) a title page was added that includes information such as Lead NRR Organization, Lead Supervisor, Task Manager, Applicability, and Projected Completion Date; (2) detailed schedule information was deleted; and (3) a new Section 3 entitled Basis for Continued Plant Operation and Licensing Pending Completion of Task was added. These changes represent general reformatting and the addition or deletion of certain general types of information. Some substantive revisions were made to several of the plans, however, a general revision of all of the plans was not undertaken at this time

  17. Dynamics in self-regulation : Plan execution self-efficacy and mastery of action plans

    OpenAIRE

    Scholz, Urte; Sniehotta, Falco F.; Schüz, Benjamin; Oeberst, Andries

    2007-01-01

    This study investigated whether an individual's plan execution self-efficacy precedes mastery of the respective action plan or vice versa. Study participants were 122 cardiac rehabilitation patients. Plan execution self-efficacy and mastery of a personal action plan on physical activity were assessed each week for 6 weeks after discharge from rehabilitation. Physical exercise was assessed 2 months after discharge. Multilevel cross-lagged panel analyses resulted in a positive effect of mastery...

  18. Action plan for renewable energy sources

    International Nuclear Information System (INIS)

    2000-03-01

    In the Finnish Energy Strategy, approved by the Finnish Government in 1997, the emphasis is laid on the importance of bioenergy and other renewable energy sources for the creation of such prerequisites for the Finnish energy economy that the supply of energy can be secured, the price on energy is competitive and the emissions from energy generation are within the limits set by the international commitments made by Finland. In 1998, the European Union Meeting of the Ministers of Energy adopted a resolution taking a positive attitude to the Communication from the Commission 'Energy for the future: Renewable sources of energy' - White Paper for a Community Strategy and Action Plan. National measures play a key role in the achievement of the objectives set in the White Paper. This Action Plan for Renewable Energy Sources is a national programme in line with the EU's White Paper. It comprises all renewable sources of energy available in Finland. It encompasses even peat, which in Finland has traditionally been considered to be a solid biofuel but is internationally classified as one of the non-renewable sources of energy. In the Action Plan, objectives are set for the volume of renewable energy sources used in the year 2010 including a prognosis on the development by the year 2025. The goal is that by the year 2010 the volume of energy generated using renewable energy sources has increased by 50% compared with the year 1995. This would mean an increase by 3 Mtoe, which is about 1 Mtoe more than anticipated in the outlook based on the Finnish Energy Strategy. A further goal is to double the use of renewable energy sources by the year 2025. The aggregate use of renewable energy sources depends to a large extent both on the development of the price on energy produced using other energy sources and on possible changes in the production volume of the Finnish forest industry. The most important objective stated in the Action Plan is to improve the competitiveness of renewable

  19. 77 FR 38296 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Science.gov (United States)

    2012-06-27

    ... Prevention and Health Promotion, Division of Reproductive Health, Attn: National Public Health Action Plan... Disease Prevention and Health Promotion, Division of Reproductive Health, 4770 Buford Highway NE... topic's public health importance, existing challenges, and opportunities for action to decrease the...

  20. Planning and architectural safety considerations in designing nuclear power plants

    International Nuclear Information System (INIS)

    Konsowa, Ahmed A.

    2009-01-01

    To achieve optimum safety and to avoid possible hazards in nuclear power plants, considering architectural design fundamentals and all operating precautions is mandatory. There are some planning and architectural precautions should be considered to achieve a high quality design and construction of nuclear power plant with optimum safety. This paper highlights predicted hazards like fire, terrorism, aircraft crash attacks, adversaries, intruders, and earthquakes, proposing protective actions against these hazards that vary from preventing danger to evacuating and sheltering people in-place. For instance; using safeguards program to protect against sabotage, theft, and diversion. Also, site and building well design focusing on escape pathways, emergency exits, and evacuation zones, and the safety procedures such as; evacuation exercises and sheltering processes according to different emergency classifications. In addition, this paper mentions some important codes and regulations that control nuclear power plants design, and assessment methods that evaluate probable risks. (author)

  1. Yukon Government climate change action plan

    International Nuclear Information System (INIS)

    2009-02-01

    This Climate Change Action Plan described the measures that are being taken by the Yukon Government to adapt to, understand, and reduce contributions to climate change. The action plan is the result of input received from more than 100 individuals and organizations and provides clear direction for a strategy that will minimize the negative impacts of climate change and provide economic, social and other environmental benefits through climate change mitigation. The Yukon government has already taken many actions that respond to climate change, such as: developing the Yukon Cold Climate Innovation Centre; supporting the Northern Climate Exchange for public education and outreach; funding community recycling depots and other groups that reduce waste generation, promote public awareness and divert solid waste; and working with provincial and territorial counterparts to enhance national building standards. The main objectives of the climate change actions are to enhance knowledge and understanding of climate change; adapt to climate change; reduce greenhouse gas emissions; and lead Yukon action in response to climate change. tabs., figs.

  2. Nuclear energy and global governance to 2030 : an action plan

    International Nuclear Information System (INIS)

    Frechette, L.; Findlay, T.; Brem, M.; Hanson, J.; Bunch, M.; McCausland, T.

    2010-01-01

    This document presented the key findings of the Nuclear Energy Futures project that was initiated in May 2006 to consider global governance of nuclear energy. The five-point action plan presented in this document included: (1) nuclear safety whereby all nuclear states are committed to and capable of implementing the highest nuclear safety standards, (2) nuclear security whereby all nuclear material and facilities are secure from unauthorized access or terrorist seizure or attack, (3) nuclear nonproliferation whereby a nuclear revival does not contribute to the proliferation of nuclear weapons, (4) the re-enforcement of the International Atomic Energy Agency's centrality through increased funding, modernization and reform, and (5) stakeholder involvement whereby all partners, especially industry, participate in judiciously managing a nuclear revival. This document suggested that despite some powerful drivers, the revival of nuclear energy faces too many barriers compared to other means of electricity production. These barriers include high costs; fewer subsidies; too slow for meeting the threat of climate change; inadequate power grids; unresolved nuclear waste issue; and fears about safety, security and nuclear weapons.

  3. Nuclear energy and global governance to 2030 : an action plan

    Energy Technology Data Exchange (ETDEWEB)

    Frechette, L.; Findlay, T. (comps.); Brem, M.; Hanson, J.; Bunch, M.; McCausland, T. (eds.)

    2010-07-01

    This document presented the key findings of the Nuclear Energy Futures project that was initiated in May 2006 to consider global governance of nuclear energy. The five-point action plan presented in this document included: (1) nuclear safety whereby all nuclear states are committed to and capable of implementing the highest nuclear safety standards, (2) nuclear security whereby all nuclear material and facilities are secure from unauthorized access or terrorist seizure or attack, (3) nuclear nonproliferation whereby a nuclear revival does not contribute to the proliferation of nuclear weapons, (4) the re-enforcement of the International Atomic Energy Agency's centrality through increased funding, modernization and reform, and (5) stakeholder involvement whereby all partners, especially industry, participate in judiciously managing a nuclear revival. This document suggested that despite some powerful drivers, the revival of nuclear energy faces too many barriers compared to other means of electricity production. These barriers include high costs; fewer subsidies; too slow for meeting the threat of climate change; inadequate power grids; unresolved nuclear waste issue; and fears about safety, security and nuclear weapons.

  4. Transformation of a virtual action plan into a motor plan in the premotor cortex.

    Science.gov (United States)

    Nakayama, Yoshihisa; Yamagata, Tomoko; Tanji, Jun; Hoshi, Eiji

    2008-10-08

    Before preparing to initiate a forthcoming motion, we often acquire information about the future action without specifying actual motor parameters. The information for planning an action at this conceptual level can be provided with verbal commands or nonverbal signals even before the associated motor targets are visible. Under these conditions, the information signifying a virtual action plan must be transformed to information that can be used for constructing a motor plan to initiate specific movements. To determine whether the premotor cortex is involved in this process, we examined neuronal activity in the dorsal premotor cortex (PMd) of monkeys performing a behavioral task designed to isolate the behavioral stages of the acquisition of information for a future action and the construction of a motor plan. We trained the animals to receive a symbolic instruction (color and shape of an instruction cue) to determine whether to select the right or left of targets to reach, despite the physical absence of targets. Subsequently, two targets appeared on a screen at different locations. The animals then determined the correct target (left or right) based on the previous instruction and prepared to initiate a reaching movement to an actual target. The experimental design dissociated the selection of the right/left at an abstract level (action plan) from the physical motor plan. Here, we show that activity of individual PMd neurons initially reflects a virtual action plan transcending motor specifics, before these neurons contribute to a transformation process that leads to activity encoding a motor plan.

  5. Indonesia and the BRICS: Implementing the BEPS Action Plan

    Directory of Open Access Journals (Sweden)

    Andrey Shelepov

    2017-12-01

    Full Text Available Tax base erosion and profit shifting (BEPS is a global problem. Finding solutions is a challenge for most countries. The global economic crisis led to a new environment and requirements for doing business. These requirements have been developed by two key international institutions: the Organisation for Economic Cooperation and Development (OECD and the Group of 20 (G20. This approach has engaged the developed and developing countries that are members of these institutions, as well as a significant number of partner countries. As a result, more than 100 countries have confirmed their commitment to the BEPS Action Plan. This article assesses the level of implementation of the BEPS Plan in Indonesia and in the BRICS countries of Brazil, Russia, India, China and South Africa. The author monitored their activities for 13 of the 15 actions (excluding Actions 11 and 15 and identifies several best practices that can be used by Russia. Monitoring considered implemented and planned actions, primarily amendments to and new norms in relevant national legislation, as well as the expected implementation time for all BEPS actions. In addition, the author assessed institutional environments created to implement the provisions of the Action Plan, consultation processes and mechanisms for informing stakeholders. Analysis shows that approaches to implementing the BEPS Action Plan differ among the six countries. Although several lag behind in terms of their implementation schedule, each country has demonstrated some efforts that can be considered best practices. Russia has succeeded the most in implementing the Action Plan

  6. Turning strategy into action: implementing a conservation action plan in the Cape Floristic Region

    CSIR Research Space (South Africa)

    Gelderblom, CM

    2003-07-01

    Full Text Available for conservation. These pressures are predicted to intensify, as the region acts as a magnet for settlement and development. This paper thus describes the development of a conservation action plan for the region, arising from the Cape Action Plan...

  7. U. S. Department of energy actions to ensure nuclear safety at its nuclear facilities in response to lessons being learned from the Fukushima dacha accident

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Dae; O' Brien, James [U. S. Department of Energy, Washington (United States)

    2012-03-15

    The U. S. Department of Energy (DOE) has established a rigorous nuclear safety regulatory infrastructure for the protection of workers, the public, and the environment. An essential part of this infrastructure is a safety culture that promotes organizational learning and includes a commitment to safety by senior leaders that is demonstrated through their actions and behaviors. The tragic Fukushima Dacha accident presented an important challenge for DOE leaders to demonstrate a robust safety culture by critically examining the Department' s regulatory infrastructure and its implementation to ensure that appropriate safety provisions were in place. This paper discusses the actions DOE has taken to date in this regard and further planned action to ensure safety at DOE facilities in light of lessons being learned from the Fukushima Dacha accident.

  8. U. S. Department of energy actions to ensure nuclear safety at its nuclear facilities in response to lessons being learned from the Fukushima dacha accident

    International Nuclear Information System (INIS)

    Chung, Dae; O'Brien, James

    2012-01-01

    The U. S. Department of Energy (DOE) has established a rigorous nuclear safety regulatory infrastructure for the protection of workers, the public, and the environment. An essential part of this infrastructure is a safety culture that promotes organizational learning and includes a commitment to safety by senior leaders that is demonstrated through their actions and behaviors. The tragic Fukushima Dacha accident presented an important challenge for DOE leaders to demonstrate a robust safety culture by critically examining the Department' s regulatory infrastructure and its implementation to ensure that appropriate safety provisions were in place. This paper discusses the actions DOE has taken to date in this regard and further planned action to ensure safety at DOE facilities in light of lessons being learned from the Fukushima Dacha accident

  9. Government of Canada Action Plan 2000 on Climate Change

    International Nuclear Information System (INIS)

    2000-01-01

    In this first National Climate Change Business Plan the Government of Canada affirms its intention to invest up to $500 million over five years on specific actions to reduce greenhouse gas emissions. This sum is in addition to the action plans being put forward by the provincial and territorial governments and in addition to the $625 million investment over five years announced in Budget 2000. Action Plan 2000 targets key sectors, and the measures announced are expected to take Canada one third of the way to achieving the target established in the Kyoto Protocol by reducing Canada's GHG emissions by 65 megatonnes per year during the 2008-2012 commitment period. The key sectors targeted include the areas of transportation, oil, gas and electricity production, industry, buildings, forestry and agriculture, i. e. sectors that together account for over 90 per cent of Canada's GHG emissions.The Action Plan focuses on reducing GHG emissions in a cost effective way; draws extensively on the best ideas put forward by the provinces, territories and other stakeholders; encourages action by industry and consumers; complements measures and actions by the provinces and territories to address regional issues; and sets the stage for long-term behavioural, technological and economic changes. The remainder of Canada's Kyoto commitments will be addressed by actions in future plans which are currently in the process of being developed, together with the development of further details of this first National Climate Change Business Plan

  10. The 1986 action plan

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Discussion covers the actions that must be taken and the standards to be met to achieve the goals of the 20 year plan. Bonneville Power Administration (BPA) has agreed to develop detailed work plans for achieving the objects of the plan, through a public process in consultation with the Council and interested parties. BPA work plans and activities are outlined. The Council's plan emphasizes the following priorities: (1) a stronger regional role for BPA; (2) development of the capability to acquire conservation on a regional basis; (3) strategies to make better use of the hydropower system; (4) building conservation capability in all sectors; (5) demonstrating the cost effectiveness of renewable resources so they are available before the region has to build new generating resources; (6) allocation of costs for two unfinished nuclear power plants and elimination of barriers to their completion; and (7) a study of electric power sales and purchases between regions

  11. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  12. Safety-related operator actions: methodology for developing criteria

    International Nuclear Information System (INIS)

    Kozinsky, E.J.; Gray, L.H.; Beare, A.N.; Barks, D.B.; Gomer, F.E.

    1984-03-01

    This report presents a methodology for developing criteria for design evaluation of safety-related actions by nuclear power plant reactor operators, and identifies a supporting data base. It is the eleventh and final NUREG/CR Report on the Safety-Related Operator Actions Program, conducted by Oak Ridge National Laboratory for the US Nuclear Regulatory Commission. The operator performance data were developed from training simulator experiments involving operator responses to simulated scenarios of plant disturbances; from field data on events with similar scenarios; and from task analytic data. A conceptual model to integrate the data was developed and a computer simulation of the model was run, using the SAINT modeling language. Proposed is a quantitative predictive model of operator performance, the Operator Personnel Performance Simulation (OPPS) Model, driven by task requirements, information presentation, and system dynamics. The model output, a probability distribution of predicted time to correctly complete safety-related operator actions, provides data for objective evaluation of quantitative design criteria

  13. NIH Launches National COPD Action Plan | NIH MedlinePlus the Magazine

    Science.gov (United States)

    ... COPD Action Plan Follow us NIH Launches National COPD Action Plan Photo: National Heart, Lung, and Blood ... questions for NIH MedlinePlus magazine. Why was the COPD National Action Plan created? The staggering numbers associated ...

  14. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1985-06-01

    This plan describes the safety issues, regulatory needs, and the research necessary to address these needs. The plan also discusses the relationship between current and proposed research within the NRC and research sponsored by other government agencies, universities, industry groups, professional societies, and foreign sources

  15. The action of the project coordinator with respect to reactor safety

    International Nuclear Information System (INIS)

    Leclercq, Jacques

    1981-01-01

    Before describing the various actions of the project coordinator (EDF) entrusted with the building of nuclear power stations, with respect to reactor safety in France, the definition of reactor safety and the various participants are mentioned first. These participants are: the Government Departments and the Experts involved (the Department of Nuclear Safety of the 'Institut de Protection et de Surete Nucleaire' forming the first technical support) and the applicant, namely the EDF. The reactor safety actions of the project coordinator are defined as from the following components: 1 - The targets laid down with respect to safety, the final objective being the protection of workers and the public against the potential dangers of the installations, principally against radiation. 2 - The safety methodology at the design stage of the power station: 'barrier' method, defence method in depth at three levels, lines of assurance method, and probabilistic method. 3 - Safety actions at the construction stage within the context of an assurance of quality programe. 4 - Safety at the trials, commissioning and operating stage, with the backing of the 'Groupe Operationnel de Demarrage (G.O.D.)' and the 'Commission d'Essais sur Site (C.E.S.)'. An initial balance sheet of the reactor safety actions for the PWR units built by the EDF is presented [fr

  16. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment

  17. Development of Comprehensive Nuclear Safety Regulation Plan for 2007-2011

    International Nuclear Information System (INIS)

    Choi, Young Sung; Kim, Woong Sik; Park, Dong Keuk; Kim, Ho Ki

    2006-01-01

    The Article 8-2 of Atomic Energy Act requires the government to establish Atomic Energy Promotion Plan every five years. It sets out national nuclear energy policies in a systematic and consistent way. The plan presents the goals and basic directions of national nuclear energy policies on the basis of current status and prospects. Both areas of utilization and safety management of nuclear energy are included and various projects and schedules are delineated based on the national policy directions. The safety management area in this plan deals with the overall safety and regulation policy. Its detail projects and schedule should be developed in separate plans by responsible ministries under the mediation of the MOST. As a regulatory authority, MOST is responsible for safety management area and its technical support organization, KINS has developed Comprehensive Nuclear Safety Regulation Plan as an implementation plan of safety area. This paper presents the development process and specific projects contained in the Comprehensive Nuclear Safety Regulation Plan which is under development now

  18. Corrective action strategy for single-shell tanks containing organic chemicals

    International Nuclear Information System (INIS)

    Turner, D.A.

    1993-08-01

    A Waste Tank Organic Safety Program (Program) Plan is to be transmitted to the U.S. Department of Energy, Richland Operations Office (RL) for approval by December 31, 1993. In April 1993 an agreement was reached among cognizant U.S. Department of Energy - Headquarters (HQ), RL and Westinghouse Hanford Company (WHC) staff that the Program Plan would be preceded by a ''Corrective Action Strategy,'' which addressed selected planning elements supporting the Program Plan. The ''Corrective Action Strategy'' would be reviewed and consensus reached regarding the planning elements. A Program Plan reflecting this consensus would then be prepared. A preliminary ''corrective action strategy'' is presented for resolving the organic tanks safety issue based on the work efforts recommended in the ISB (Interim Safety Basis for Hanford Site tank farm facilities). A ''corrective action strategy'' logic was prepared for individual SSTs (single-shell tanks), or a group of SSTs having similar characteristics, as appropriate. Four aspects of the organic tanks safety issue are addressed in the ISB: SSTs with the potential for combustion in the tank's headspace; combustion of a floating organic layer as a pool fire; surface fires in tanks that formerly held floating organic layers; SSTs with the potential for organic-nitrate reactions. A preliminary ''corrective action strategy'' for each aspect of the organic tanks safety issue is presented

  19. Hungarian climate change action plan

    Energy Technology Data Exchange (ETDEWEB)

    Molnar, S.; Takacs, T. [Systemexpert Consulting Ltd., Budapest (Hungary); Arpasi, M. [MOL, Budapest (Hungary); Farago, T.; Palvoelgyi, T. [Ministry for Environment and Regional Policy, Budapest (Hungary); Harnos, Z. [Univ. of Horticulture, Budapest (Hungary); Lontay, Z. [EGI-Contracting Engineering Co. Ltd., Budapest (Hungary); Somogyi, Z. [Forest Research Inst., Budapest (Hungary); Tajthy, T. [Univ. of Technology, Budapest (Hungary)

    1998-12-31

    In 1994--1996, within the framework of the US Country Studies Program, the Hungarian Country Study Team developed the national greenhouse gas emission inventory, and elaborated the mitigation options for the different sectors of the economy. In 1997, the development of a National Action Plan was begun as the continuation of this work. Results of the inventory study showed that greenhouse gas emissions decreased from the selected base level (i.e., from the yearly average emissions of 1985--1987) until 1994 by cca. 25%. However, this decrease was primarily caused by the deep economic recession. Therefore the policy makers have to face the problem of economic recovery without a relevant increase of greenhouse gas emissions in the near future. This is the main focus of the mitigation analysis and the National Action Plan.

  20. Plan Generation and Evaluation Using Action Networks

    National Research Council Canada - National Science Library

    Peot, Mark

    2003-01-01

    ... from potential actions of the plan. Methods used to accomplish these results included the use of Action Networks, and development of a suite of analysis tools in support of the AFRL Campaign Assessment Tool...

  1. Fukushima action plan 2014; Aktionsplan Fukushima 2014

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-02-15

    Immediately after the reactor accident of the Japan power plant (NPP) at Fukushima-Daiichi on 11{sup th} March 2011, the Swiss Federal Nuclear Safety Inspectorate (ENSI) took measures to verify the safety of the Swiss NPPs which were formulated in 4 ordinances. In the first three, immediate actions and additional verifications were required. They included the building of a common external emergency equipment storage facility for all Swiss NPPs and the required plant-specific connections for accident management equipment as well as an update of ducts used for the external water supply of the fuel assembly storage pools. Subject of additional checks was the design of the Swiss NPPs as far as earthquakes, external flooding and the combination of both are concerned. Further, checking the coolant supply of the safety systems and fuel assembly storage pools was required. At the same time as the checking carried out by the plant operators, ENSI conducted inspections to examine the cooling systems of the fuel assembly storage pools, protection against external flooding and the filtered containment pressure-release systems. The inspections made in 2012 examined the strategies of the plant operators in the case of a long-lasting loss of electricity supply, the process and documents for the evaluation of external events and the premises foreseen in case of emergency. In 2013 the material for protection against radiation which is a fundamental condition for the mastering of a severe accident, was inspected at all NPPs. Radiation protection material is also essential for the long-lasting use of premises by the emergency organisation. The ENSI inspection results have confirmed that the Swiss NPPs show a high degree of protection against the effects of earthquakes, flooding and the combination of both, and that appropriate actions have been taken against loss of electricity supply and/or heat removal. All analysed accidents can be managed under consideration of the presently

  2. Addendum to the health and safety plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Burman, S.N.; Wilson, K.A.

    1995-08-01

    There are three purposes for this addendum to the health and safety plan for Waste Area Grouping 6. The first purpose is to provide record of a corrective action response concerning an occurrence on WAG 6 in October 1994 (ORO-MMES-ENVRES-1994-0016.) This occurrence involved a precautionary evacuation of subcontractor field crews due to malfunctioning monitor alarms for organic vapors. The corrective action is to revise the WAG 6 Site health and safety plan to improve communications during emergency events. The second purpose is to incorporate any outstanding health and safety issues not addressed in the original health and safety plan for WAG 6 document (ORNL/ER-183). The only variance of note is tritium air monitoring in the Tumulus building. The tritium air monitor is added in this addendum as monitoring equipment for WAG 6 with description of action level and calibration. The third purpose of this addendum is to satisfy a condition of approval for the pending Nuclear Criticality Safety Assessment (NCSA) pertaining to KEMA fuel storage at WAG 6. This approval condition requires the following: ''The location of the KEMA burial shall be recorded and maintained in a controlled document that identifies the quantity and the general physical conditions at the time of the entombment with an admonishment to obtain nuclear criticality safety guidance before altering the burial condition.'' In order to satisfy the approval, this document must be controlled. The predecessor to the pending NCSA is NSR No. 0002WM22001

  3. Ontario's energy action plan

    International Nuclear Information System (INIS)

    2003-07-01

    In the fall of 2002, the government of Ontario announced an action plan designed to ensure stable electricity prices while additional electricity generating capacity is built. The action plan included a strategy for encouraging major private sector investments in wind, solar and other renewable energy sources. The strategies for new renewable energy projects include: property tax incentives, business income tax incentives, and sales tax rebates. Initiatives to increase supply include: Toronto's Portland 550 megawatt, natural gas-fired generating station, Niagara Falls' Beck Tunnel Project, and Windsor's 580 megawatt natural gas-fired generating station. The government is promoting energy conservation by reducing its electricity consumption by 10 per cent, and setting a target where 20 per cent of electricity consumed in the province must be from renewable energy sources. The use of interval meters by Ontario residents is being encouraged. A provincial sales tax rebate is being offered to customers buying select energy efficient appliances. In its commitment to environmental protection, the Ontario government is phasing out coal, offering rebates for solar energy systems, implementing measures to reduce acid rain, and investing $3.25 billion over ten years to renew and expand public transit. In Chatham, Ontario, a plant producing ethanol from corn was built, and others are planned for other parts of the province. Tax incentives are also offered for alternative fuel users. 1 ref., 1 tab

  4. OCRWM [Office of Civilian Radioactive Waste Management] Safety Plan

    International Nuclear Information System (INIS)

    1986-12-01

    The OCRWM Safety Plan sets forth management policies and general requirements for the safety of the public and of personnel associated with the Civilian Radioactive Waste Management Program (hereinafter called the ''Program''). It is applicable to all individuals and organizational elements of the Program, including all facilities and activities controlled by the Program pursuant to the Act, and to all phases of the Program. The plan defines the responsibilities assigned by the Director of the OCRWM to the various OCRWM line organizations, and to the contractors and the projects. It discusses the means by which safety policies and requirements will be communicated, and summarizes the applicable DOE Orders, and the procedures for reviewing, reporting, and evaluating safety problems. In addition, the OCRWM Safety Plan addresses DOE Orders applicable to occupational health and safety, worker protection, and public health and safety. OCRWM believes that it has an equally high level of commitment to both public safety and worker safety. The Plan also summarizes applicable NRC criteria and regulations that will be imposed through the formal licensing proceedings. While the Safety Plan sets forth OCRWM policy, it is not intended to be prescriptive in the details of implementation. Each OCRWM program element must develop and control its own set of detailed requirements for the protection of its workers and the public based on the principles set forth herein

  5. Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.

    Science.gov (United States)

    Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge

    2015-12-01

    Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.

  6. Housekeeping category corrective action unit work plan

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process

  7. Probabilistic safety assessment; actions and priorities in the EC-frame

    International Nuclear Information System (INIS)

    Amendola, A.; Mancini, G.; Volta, G.

    1987-01-01

    An overview is given of PSA research activities at the JRC and through shared cost actions with national laboratories under the nuclear reactor safety and major hazards of industrial installations programmes. These activities are directed towards the development of methods for PSA, the validation methods and the setting up of appropriate data bases. PSA is also directly or indirectly an emerging theme for the coordination activities in the area of nuclear safety criteria and safety objectives. Finally probabilistic techniques being increasing by being used for safety and reliability in various industrial sectors the CEC supported the preparation and setting up of a European Safety and Reliability Association that carries different types of actions. (orig.)

  8. HERCA Action Plan in relation to the transposition and implementation of Directive 2013/59/Euratom (Euratom BSS)

    International Nuclear Information System (INIS)

    Fremout, An; Vanderlinck, Annie; Berlamont, Jolien; Van Bladel, Lodewijk; Petrova, Karla; Ulbak, Kaare; Mundigl, Stefan; ); Markkanen, Mika; Godet, Jean-Luc; Tran-Thien, Vivien; Koch, Isabell Christin; Hackstein, Matthias; Griebel, Juergen; Kamenopoulou, Vasiliki; Fennel, Stephan; Ryan, Tom; Schreiner, Alexandra; Majerus, Patrick; Vermeulen, Ton; Holo, Eldri; Wiklund, Asa; RYF, Salome; Thomas, Gareth; Wellens, Rob; Ebdon-Jackson, Steve

    2014-10-01

    On 5 December 2013, the Council of the European Union adopted Council Directive 2013/59/Euratom laying down basic safety standards for protection against the dangers arising from exposure to ionising radiation.1 Member States have to transpose the new Basic Safety Standards Directive (BSS Directive) into their national legal systems by 6 February 2018 at the latest. At the 13. meeting of the Board of HERCA (BoH) in Vilnius in June 2014, a proposal to establish a special Task Force (TF) to make proposals in relation to HERCA activities in support of the transposition and implementation of the new Euratom BSS Directive was agreed. The BSS-TF was established, commenced its work on the basis of a 'non-questionnaire' and a discussion document. It met on one occasion on 7 October 2014 and agreed an action plan for consideration by the BoH. The agreed action plan proposal was approved by the BoH on the occasion of its 14. meeting in Stockholm, on 21-22 October 2014. The approved Action Plan covers the following areas: - Identification of HERCA's role in the transposition of the new Euratom BSS; - Definition of actions for HERCA in relation to the transposition of the BSS; - Coordination between HERCA and the EC in relation to BSS transposition activities. The Actions identified relate to several subject areas: Emergency preparedness and response; Medical exposures; Radon; Non-medical imaging exposures; RPE/RPO; General exchange of information. HERCA is a voluntary association, in which the Heads of European Radiological Protection Competent Authorities work together in order to identify common issues and propose practical solutions for these issues. It has no statutory role in relation to the transposition of the Euratom BSS. However, additional work by HERCA can support the transposition process as indicated in the Action Plan. Uniform transposition or implementation in the Member States is not an objective of HERCA activities. Clearly it will remain a matter for

  9. Fukushima action plan 2015; Aktionsplan Fukushima 2015

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-02-15

    Immediately after the reactor accident at the Japanese power plant (NPP) in Fukushima-Daiichi on 11{sup th} March 2011, the Swiss Federal Nuclear Safety Inspectorate (ENSI) took measures to verify the safety of Swiss NPPs which were formulated in 4 ordinances. In the first 3, immediate actions and additional verifications were required. They included the building of a common external emergency equipment storage facility for all Swiss NPPs and the required plant specific connections for accident management equipment as well as an update of ducts used for the external water supply to the fuel assembly storage pools. Object of additional scrutiny was the design of the Swiss NPPs as afar as earthquakes, external flooding and combination of both is concerned. Further, checking the coolant supply of the safety systems and fuel assembly storage pools was required. At the same time as the checks carried out by the plant operators, ENSI conducted inspections to examine the cooling systems of the fuel assembly storage pools, protection against external flooding and the filtered containment pressure-release systems. The inspections made in 2012 examined the strategies of the plant operators in the case of a long-lasting loss of electricity supply, the process and documents for the evaluation of external events and the premises foreseen in case of emergency. In 2013 the material for protection against radiation which is a fundamental condition for the mastering of a serious accident, was inspected at all NPPs. Radiation protection material is also essential for the long-lasting use of premises by the emergency organisation. The ENSI inspection results have confirmed that the Swiss NPPs show a high degree of protection against the effects of earthquakes, flooding and the combination of both, and that appropriate actions have been taken against loss of electricity supply and/or heat removal. All analysed accidents can be managed under consideration of the presently valid risk

  10. Wetland Resources Action Planning (WRAP) toolkit

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Smith, Kevin G.; Lund, Søren

    2013-01-01

    The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims to communi......The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims...... to communicate best practices in conserving biodiversity and sustaining ecosystem services to potential users and to promote the wise-use of aquatic resources, improve livelihoods and enhance policy information....

  11. Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory

    International Nuclear Information System (INIS)

    1992-01-01

    On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES ampersand H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, from which the Team derived four key findings. In the Safety and Health (S ampersand H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S ampersand H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER)

  12. Research on the Evaluation System for Rural Public Safety Planning

    Institute of Scientific and Technical Information of China (English)

    Ming; SUN; Jianxin; YAN

    2014-01-01

    The indicator evaluation system is introduced to the study of rural public safety planning in this article.By researching the current rural public safety planning and environmental carrying capacity,we select some carrying capacity indicators influencing the rural public safety,such as land,population,ecological environment,water resources,infrastructure,economy and society,to establish the environmental carrying capacity indicator system.We standardize the indicators,use gray correlation analysis method to determine the weight of indicators,and make DEA evaluation of the indicator system,to obtain the evaluation results as the basis for decision making in rural safety planning,and provide scientific and quantified technical support for rural public safety planning.

  13. Software quality assurance plans for safety-critical software

    International Nuclear Information System (INIS)

    Liddle, P.

    2006-01-01

    Application software is defined as safety-critical if a fault in the software could prevent the system components from performing their nuclear-safety functions. Therefore, for nuclear-safety systems, the AREVA TELEPERM R XS (TXS) system is classified 1E, as defined in the Inst. of Electrical and Electronics Engineers (IEEE) Std 603-1998. The application software is classified as Software Integrity Level (SIL)-4, as defined in IEEE Std 7-4.3.2-2003. The AREVA NP Inc. Software Program Manual (SPM) describes the measures taken to ensure that the TELEPERM XS application software attains a level of quality commensurate with its importance to safety. The manual also describes how TELEPERM XS correctly performs the required safety functions and conforms to established technical and documentation requirements, conventions, rules, and standards. The program manual covers the requirements definition, detailed design, integration, and test phases for the TELEPERM XS application software, and supporting software created by AREVA NP Inc. The SPM is required for all safety-related TELEPERM XS system applications. The program comprises several basic plans and practices: 1. A Software Quality-Assurance Plan (SQAP) that describes the processes necessary to ensure that the software attains a level of quality commensurate with its importance to safety function. 2. A Software Safety Plan (SSP) that identifies the process to reasonably ensure that safety-critical software performs as intended during all abnormal conditions and events, and does not introduce any new hazards that could jeopardize the health and safety of the public. 3. A Software Verification and Validation (V and V) Plan that describes the method of ensuring the software is in accordance with the requirements. 4. A Software Configuration Management Plan (SCMP) that describes the method of maintaining the software in an identifiable state at all times. 5. A Software Operations and Maintenance Plan (SO and MP) that

  14. Then years of nuclear safety in France: administrative action

    International Nuclear Information System (INIS)

    Torquat, C. de; Levy, M.

    1983-01-01

    General principles of administrative action concerning nuclear safety in France are recalled. The three principal and complementary aspects of the action are described: technical regulations; administrative procedures; inspection of plant being constructed or already in operation [fr

  15. Uranium Mill Tailings Remedial Action Project Environmental Line Management Audit Action Plan. Final report. Audit, October 26, 1992--November 6, 1992

    International Nuclear Information System (INIS)

    1993-07-01

    This Action Plan contains responses, planned actions, and estimated costs for addressing the findings discovered in the Environmental Management Audit conducted for the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRA), October 26 through November 6, 1992. This document should be read in conjunction with the Audit Report to ensure the findings addressed in this document are fully understood. The scope of the UMTRA Environmental Management Audit was comprehensive and encompassed all areas of environmental management except environmental programs pertaining to the National Environmental Policy Act (NEPA) compliance. The Audit Report listed 18 findings: 11 were identified as compliance findings, and the remaining 7 were best management practice findings. Root cause analysis was performed on all the findings. The results of the analysis as well as planned corrective actions are summarized in Section 5.0. All planned actions were prioritized using the Tiger Team Assessment Corrective Action Plan system. Based on assigned priorities, all planned actions were costed by fiscal year. This Action Plan contains a description of the organizational and management structures to be used to implement the Action Plan, a brief discussion of root cause analysis and funding, followed by the responses and planned actions for each finding. A member of the UMTRA Project Office (PO) has been assigned responsibility for tracking the progress on each of the findings. The UMTRA PO staff wrote and/or approved all of the corrective actions recorded in this Action Plan

  16. Assessment of Evacuation Protective Action Strategies For Emergency Preparedness Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Joomyung; Jae, Moosung [Hanyang Univ., Seoul (Korea, Republic of); Ahn, Kwangil [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    This report which studies about evacuation formation suggests some considerable factors to reduce damage of radiological accidents. Additional details would be required to study in depth and more elements should be considered for updating emergency preparedness. However, this methodology with sensitivity analysis could adapt to specific plant which has total information such as geological data, weather data and population data. In this point of view the evacuation study could be contribute to set up emergency preparedness plan and propose the direction to enhance protective action strategies. In radiological emergency, residents nearby nuclear power plant should perform protective action that is suggested by emergency preparedness plan. The objective of emergency preparedness plan is that damages, such as casualties and environmental damages, due to radioactive accident should be minimized. The recent PAR study includes a number of subjects to improve the quality of protective action strategies. For enhancing protective action strategies, researches that evaluate many factors related with emergency response scenario are essential parts to update emergency preparedness plan. Evacuation is very important response action as protective action strategy.

  17. Assessment of Evacuation Protective Action Strategies For Emergency Preparedness Plan

    International Nuclear Information System (INIS)

    Lee, Joomyung; Jae, Moosung; Ahn, Kwangil

    2013-01-01

    This report which studies about evacuation formation suggests some considerable factors to reduce damage of radiological accidents. Additional details would be required to study in depth and more elements should be considered for updating emergency preparedness. However, this methodology with sensitivity analysis could adapt to specific plant which has total information such as geological data, weather data and population data. In this point of view the evacuation study could be contribute to set up emergency preparedness plan and propose the direction to enhance protective action strategies. In radiological emergency, residents nearby nuclear power plant should perform protective action that is suggested by emergency preparedness plan. The objective of emergency preparedness plan is that damages, such as casualties and environmental damages, due to radioactive accident should be minimized. The recent PAR study includes a number of subjects to improve the quality of protective action strategies. For enhancing protective action strategies, researches that evaluate many factors related with emergency response scenario are essential parts to update emergency preparedness plan. Evacuation is very important response action as protective action strategy

  18. High-temperature gas-cooled reactor safety-reliability program plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The purpose of this document is to present a safety plan as part of an overall program plan for the design and development of the High Temperature Gas-Cooled Reactor (HTGR). This plan is intended to establish a logical framework for identifying the technology necessary to demonstrate that the requisite degree of public risk safety can be achieved economically. This plan provides a coherent system safety approach together with goals and success criterion as part of a unifying strategy for licensing a lead reactor plant in the near term. It is intended to provide guidance to program participants involved in producing a technology base for the HTGR that is fully responsive to safety consideration in the design, evaluation, licensing, public acceptance, and economic optimization of reactor systems.

  19. Interest Deductibility and the BEPS Action Plan: nihil novi sub sole?

    OpenAIRE

    Traversa, Edoardo

    2013-01-01

    Interest payments between affiliated companies which aim at shifting profit from high to low tax countries are a well-known and frequently used tool in international tax planning. It is therefore not surprising that in the OECD Action Plan on Base Erosion and Profit Shifting (BEPS) (Action Plan) considerable attention is given to the measures limiting the deductibility of (excessive) intra-group interest payments.1 The Action Plan does not, however, provide any clear guidance as to which, amo...

  20. Guam Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  1. Mitigation action plan for 300-FF-1 remedial action

    International Nuclear Information System (INIS)

    Weiss, S.G.

    1996-10-01

    A record of decision was issued (dated July 1996), for remediation of waste sites in the 300-FF-1 Operable Unit in the 300 Area of the Hanford Site. The selected remedies for the 300-FF-1 and 300-FF-5 waste sites include selective excavation and disposal of contaminated soil and debris from the process waste units, excavation and removal of the 618-4 Burial Ground, and institutional controls for groundwater. This mitigation action plan explains how cultural resources will be managed and how revegetation for these remedial activities will be planned

  2. Safety and health five-year plan, Fiscal years 1995--1999

    International Nuclear Information System (INIS)

    1994-10-01

    This report describes efforts by the Department of Energy (DOE) to size and allocate funding to safety and health activities that protect workers and the public from harm. Although it is well recognized that virtually every aspect of an operation has health and safety implications, this effort is directed at identifying planned efforts specifically directed at health and safety. The initial effort, to compile information for the period covering FY 1994--1998, served two primary needs: (1) to document what was actually taking place in the DOE Complex, from a budget and resource utilization standpoint (how the complex was reacting to the calls for greater protection for workers and the public); and (2) to embark on an effort to utilize forward-looking management plans to allocate resources to meet safety and health needs (to begin to be proactive). It was recognized that it would take several years to achieve full acceptance and implementation of a single, DOE-wide approach toward planning for safety and health, and to develop plans that emphasized the benefits from both risk management and accident prevention strategies. This report, describing safety and health plans and budgets for FY 1995, reflects the increasing acceptance of risk-based strategies in the development of safety and health plans. More operations are using the prioritization methodology recommended for the safety and health planning process, and more operations have begun to review planned expenditures of resources to better assure that resources are allocated to the highest risk reduction activities

  3. 78 FR 42071 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Science.gov (United States)

    2013-07-15

    ... Guides Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents AGENCY... guidance ``PAG Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents... ``anonymous access'' system, which means the EPA will not know your identity or contact information unless you...

  4. Health and safety plan for operations performed for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  5. Health and safety plan for operations performed for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Trippet, W.A. II; Reneau, M.; Morton, S.L.

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG ampersand G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP

  6. 29 CFR 1917.30 - Emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... action plans—(1) Scope and application. This paragraph (a) requires all employers to develop and... departments that can be contacted for further information or explanation of duties under the plan. (3) Alarm... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work...

  7. NIF conventional facilities construction health and safety plan

    International Nuclear Information System (INIS)

    Benjamin, D W

    1998-01-01

    The purpose of this Plan is to outline the minimum health and safety requirements to which all participating Lawrence Livermore National Laboratory (LLNL) and non-LLNL employees (excluding National Ignition Facility [NIF] specific contractors and subcontractors covered under the construction subcontract packages (e.g., CSP-9)-see Construction Safety Program for the National Ignition Facility [CSP] Section I.B. ''NIF Construction Contractors and Subcontractors'' for specifics) shall adhere to for preventing job-related injuries and illnesses during Conventional Facilities construction activities at the NIF Project. For the purpose of this Plan, the term ''LLNL and non-LLNL employees'' includes LLNL employees, LLNL Plant Operations staff and their contractors, supplemental labor, contract labor, labor-only contractors, vendors, DOE representatives, personnel matrixed/assigned from other National Laboratories, participating guests, and others such as visitors, students, consultants etc., performing on-site work or services in support of the NIF Project. Based upon an activity level determination explained in Section 1.2.18, in this document, these organizations or individuals may be required by site management to prepare their own NIF site-specific safety plan. LLNL employees will normally not be expected to prepare a site-specific safety plan. This Plan also outlines job-specific exposures and construction site safety activities with which LLNL and non-LLNL employees shall comply

  8. Nuclear safety research master plan

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Joo; Yang, J. U.; Jun, Y. S. and others

    2001-06-01

    The SRMP (Safety Research Master Plan) is established to cope with the changes of nuclear industry environments. The tech. tree is developed according to the accident progress of the nuclear reactor. The 11 research fields are derived to cover the necessary technologies to ensure the safety of nuclear reactors. Based on the developed tech. tree, the following four main research fields are derived as the main safety research areas: 1. Integrated nuclear safety enhancement, 2. Thermal hydraulic experiment and assessment, 3. Severe accident management and experiment, and 4. The integrity of equipment and structure. The research frame and strategies are also recommended to enhance the efficiency of research activity, and to extend the applicability of research output.

  9. Texas strategic action plan for motorcycles : 2013-2018.

    Science.gov (United States)

    2013-06-01

    The Texas Strategic Action Plan for Motorcycles: 2013-2018 provides an integrated : approach to identify implementable strategies and action steps to make the : road environment and infrastructure safer for motorcyclists and other powered : two- and ...

  10. Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode.

    Science.gov (United States)

    Scheib, Jean P P; Stoll, Sarah; Thürmer, J Lukas; Randerath, Jennifer

    2018-01-01

    The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous

  11. Updated action plan for the implementation of measures as a consequence of the Fukushima reactor accident; Fortgeschriebener Aktionsplan zur Umsetzung von Massnahmen nach dem Reaktorunfall in Fukushima

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-01-15

    The action plan of the German government concerning the measures following the Fukushima reactor accident include the decision on the future of nuclear power in Germany, safety analyses, investigations and measures for nuclear power plants in a national frame, investigations in an international frame, planning for the implementation of CNS (Convention on nuclear safety) topics 1-3, i.e. measures to increase the robustness in German nuclear power plants, and the planning of implementation of further measures (CNS topics 4-6).

  12. An investigation into the relevance of action planning, theory of planned behaviour concepts, and automaticity for fruit intake action control.

    Science.gov (United States)

    de Bruijn, Gert-Jan; Wiedemann, Amelie; Rhodes, Ryan E

    2014-09-01

    In the action control framework, intention-behaviour discordance is studied around public health guidelines. Although this framework has been applied to physical activity behaviours, it has only seen very limited attention regarding fruit intake. The purpose of this study was therefore to investigate distributions and predictors of fruit intake intention-behaviour discordance. Prospective correlational design. Data were obtained from undergraduate students (n = 413) using validated questionnaires. Variables from the theory of planned behaviour, automaticity, and action planning were assessed at baseline, and fruit intake was assessed 2 weeks later. Data were analysed using discriminant function analyses and analyses of variance. The proportion of unsuccessful intenders ranged from 39.2% to 80.8%. There was a larger proportion of fruit intake intenders amongst those who reported strong automatic fruit intake. Action control was predicted by fruit intake automaticity and affective attitudes, but the strongest predictor was perceived behavioural control. No action planning items were related to fruit intake action control. There is considerable asymmetry in the intention-fruit intake relationship. An application of the action control framework may stimulate debate on the applicability of intention-based models at the public health level. What is already known on this subject? Intention is theorized to be a key construct in fruit intake. Studies in the physical activity domain indicate that nearly half of the people with positive intentions fail to subsequently act. What does this study add? The proportion of unsuccessful intenders ranged from 39.2% to 80.8%. Holding positive intentions is not sufficient to consume fruit at suggested public health guidelines. Perceived behavioural control is the most important predictor of fruit intake action control. © 2013 The British Psychological Society.

  13. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 1

    International Nuclear Information System (INIS)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains a discussion of the chemical safety improvements planned or already underway at DOE sites to correct facility or site-specific vulnerabilities. The main part of the report is a discussion of each of the programmatic deficiencies; a description of the tasks to be accomplished; the specific actions to be taken; and the organizational responsibilities for implementation

  14. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    International Nuclear Information System (INIS)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site

  15. NEAP - National Environmental Action Plan (Republic of Macedonia)

    International Nuclear Information System (INIS)

    Shnajder-Jakobi, Martin; Anastasovski, Vasil; Gorgievski, Kire.

    1997-01-01

    The Republic of Macedonia, like other Central and East European countries in transition, has started the process of reform towards a market economy. As a part of the economic development program, the Republic of Macedonia is shaping its environmental polices and identifying priority actions to protect human health and the environment and to utilize its natural resources in a sustainable manner. These polices and actions are consistent with the 'Environmental Action Programme for Central and Eastern Europe' (EAP), the document adopted at the Ministerial Conference in Lucerne in 1993. In meeting the goals towards protecting the environment, The Government of the Republic of Macedonia has prepared the National Environmental Action Plan (NEAP) with the support of the World Bank group. The Ministry of Urban Planning, Construction and Environment was the key agency involved in the preparation of the NEAP. The NEAP highlights the environmental problems and recommends actions related to policy, institutions and priority investments. (author)

  16. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    Science.gov (United States)

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  17. Evaluation criteria for communications-related corrective action plans

    International Nuclear Information System (INIS)

    1997-02-01

    This document provides guidance and criteria for US Nuclear Regulatory Commission (NRC) personnel to use in evaluating corrective action plans for nuclear power plant communications. The document begins by describing the purpose, scope, and applicability of the evaluation criteria. Next, it presents background information concerning the communication process, root causes of communication errors, and development and implementation of corrective actions. The document then defines specific criteria for evaluating the effectiveness of the corrective action plan, interview protocols, and an observation protocol related to communication processes. This document is intended only as guidance. It is not intended to have the effect of a regulation, and it does not establish any binding requirements or interpretations of NRC regulations

  18. Transport Canada's sustainable development action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-30

    Transport Canada's sustainable development strategy, tabled in the House of Commons in December 1997, sets out the direction for the Department to integrate environmental concerns with safety and efficiency in developing policies and programs and in carrying out its day-to-day activities. While recognizing that moving towards sustainable development is a long-term undertaking, the department is determined to turn 'words' into 'work'. The action plan outlined in this document is organized according to the challenges laid out in the original Sustainable Development Strategy document. Accordingly, the department shall endeavour to minimize risk of environmental damage from transportation accidents; promote greening of operations in the transportation sector; reduce emissions of hazardous substances from transportation sources; promote education and awareness on sustainable transportation; refine sustainable performance indicators; and develop and promote the application of cleaner transportation systems and transportation technologies. The bulk of the report is devoted to brief summaries of progress achieved in each of these areas to date.

  19. 49 CFR 1106.4 - The Safety Integration Plan process.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false The Safety Integration Plan process. 1106.4 Section 1106.4 Transportation Other Regulations Relating to Transportation (Continued) SURFACE... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS...

  20. Russian Minatom nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    Royen, J.

    1999-01-01

    An NEA study on safety research needs of Russian-designed reactors, carried out in 1996, strongly recommended that a strategic plan for safety research be developed with respect to Russian nuclear power plants. Such a plan was developed at the Russian International Nuclear Safety Centre (RINSC) of the Russian Ministry of Atomic Energy (Minatom). The Strategic Plan is designed to address high-priority safety-research needs, through a combination of domestic research, the application of appropriate foreign knowledge, and collaboration. It represents major progress toward developing a comprehensive and coherent safety-research programme for Russian nuclear power plants (NPPs). The NEA undertook its review of the Strategic Plan with the objective of providing independent verification on the scope, priority, and content of the research described in the Plan based upon the experience of the international group of experts. The principal conclusions of the review and the general comments of the NEA group are presented. (K.A.)

  1. Role of nuclear safety research and future plan

    International Nuclear Information System (INIS)

    Kim, W. S.; Lee, J. I.; Kang, S. C.; Park, Y. W.; Lee, J. H.; Kim, M. W.; Lee, C. J.; Park, Y. I.

    2000-01-01

    For promoting and improving nuclear safety research activities, this report gives an insight on the scope of safety research and its role in the safety management of nuclear installations, and suggests measures to adequately utilize the research results through taking an optimized role share among research organizations. Several measures such as cooperative planning of common research areas and proper role assignment, improvement of the interfaces among researchers, and reflection of end-users' opinion in the course of planning and conducting research to promote application of research results are identified. It is expected that the identified measures will contribute to enhancing the efficiency and effectiveness of nuclear safety research, if they are implemented after deliberating with the government and safety research organizations

  2. Action plan for Nordic energy co-operation 2006-2009

    International Nuclear Information System (INIS)

    2005-01-01

    The Action Plan for Nordic Energy Co-operation 2006-2009 is targeted at creating a visible and sustainable contribution to solving the most important and politically most relevant energy policy challenges faced by the Nordic region. The plan concentrates on three main areas: Energy markets; Sustainable energy system; and Nordic impact on the international agenda. The Action Plan is the energy sector's contribution to the implementation of the Nordic strategy 'Sustainable Development - New Bearing for the Nordic Countries' and to a number of the Nordic Council's recommendations for the development of the Nordic energy sector. An important element of the implementation of the action plan is on-going contact and information sharing between the Nordic Energy Policy co-operation and the Nordic Energy Research. The continues dialogue between the Nordic Council of Energy Ministers and The Nordic Council on future energy policy challenges will likewise be an important part of the political process. (BA)

  3. 12 CFR 308.303 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... time within which those steps will be taken. (c) Review of safety and soundness compliance plans... PRACTICE RULES OF PRACTICE AND PROCEDURE Submission and Review of Safety and Soundness Compliance Plans and... compliance plan. (a) Schedule for filing compliance plan—(1) In general. A bank shall file a written safety...

  4. Capacity building in the IAEA Action Plan on Nuclear Safety

    International Nuclear Information System (INIS)

    Caruso, Gustavo

    2014-01-01

    Conclusion and Future Challenges: • Momentum on Nuclear Safety; • To continue strengthening, developing, maintaining and implementing capacity building programmes, including education, training and exercises at the national, regional and international levels; • To ensure sufficient and competent human resources necessary to assume responsibility for safety; • To incorporate lessons learned from the accident based on the IEMs and IAEA Fukushima Report

  5. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    Energy Technology Data Exchange (ETDEWEB)

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort

  6. Assessment of the 2004 Danish National Action Plan for Emplyment

    DEFF Research Database (Denmark)

    Emerek, Ruth

    The report gives the economic, employment and policy context for the National Action Plan for employment, and assess the NAP from a gender persepctive......The report gives the economic, employment and policy context for the National Action Plan for employment, and assess the NAP from a gender persepctive...

  7. Logical safety system for triggering off the protection action of a safety actuator

    International Nuclear Information System (INIS)

    Plaige, Yves.

    1982-01-01

    This invention applies in particular to the emergency triggering of safety actuators controlling the shutdown of a nuclear reactor. This logical safety system includes four redundant lines each composed, inter alia, of a logical circuit for controlling the triggering of a protection action, a logical alarm circuit connected to the control circuit and a logical inhibiting circuit making it impossible to inhibit several alarm circuits simultaneously [fr

  8. Town of Canmore Energy Management Action Plan (EMAP)

    International Nuclear Information System (INIS)

    2005-03-01

    In 1999, the Town of Canmore, Alberta joined the Federation of Canadian Municipalities' Partners for Climate Protection (PCP) Program and committed to reducing greenhouse gas (GHG) emissions from municipal operations by 20 per cent and community-wide emissions by 6 per cent of 2000 levels by 2012. To date, the City has completed a baseline analysis for municipal operations and the community. It has also initiated an Energy Management Action Plan (EMAP) to identify opportunities in sustainable development through energy, GHG and air quality management. The broad community objectives include housing and transportation management, job creation and local economic development. The city has adopted The Natural Step (TNS) framework which defines sustainability and the guiding principles for decision-making. The objectives of EMAP are to define and evaluate options for a practical strategy and action plan to meet the city's GHG reduction targets; raise local awareness of the issues and opportunities of energy planning and GHG reductions and develop a local action plan outlining action items to reduce energy use and GHG emissions from municipal operations throughout the community. This report explained the methodology and framework for EMAP management and presented a community profile for the Town of Canmore. It also included an energy and emissions inventory and forecast with reference to corporate energy and emissions baseline; community energy and emissions baseline; corporate energy and emissions forecast; community energy and emissions forecast and corporate and community GHG targets. refs., tabs., figs

  9. National climate change action plans: Interim report for developing and transition countries

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, R.; Ness, E.; Hirst, J. [eds.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  10. Safety Evaluation report on Tennessee Valley Authority: Sequoyah nuclear performance plan

    International Nuclear Information System (INIS)

    1988-05-01

    This Safety Evaluation Report (SER) on the information submitted by the Tennessee Valley Authority (TVA) in its Sequoyah Nuclear Performance Plan, through Revision 2, and supporting documents has been prepared by the US Nuclear Regulatory Commission staff. The plan addresses the plant-specific concerns requiring resolution before startup of either of the Sequoyah units. In particular, the SER addresses required actions for Unit 2 restart. In many cases, the programmatic aspects for Unit 1 are identical to those for Unit 2; the staff will conduct inspections of implementation of those programs. Where the Unit 1 program is different, the staff evaluation will be provided in a supplement to this SER. On the basis of its review, the staff concludes that Sequoyah-specific issues have been resolved to the extent that would support restart of Sequoyah Unit 2

  11. 300-FF-1 remedial design report/remedial action work plan

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  12. 300-FF-1 remedial design report/remedial action work plan

    International Nuclear Information System (INIS)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes

  13. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  14. Differential beta-band event-related desynchronization during categorical action sequence planning.

    Directory of Open Access Journals (Sweden)

    Hame Park

    Full Text Available A primate study reported the existence of neurons from the dorso-lateral prefrontal cortex which fired prior to executing categorical action sequences. The authors suggested these activities may represent abstract level information. Here, we aimed to find the neurophysiological representation of planning categorical action sequences at the population level in healthy humans. Previous human studies have shown beta-band event-related desynchronization (ERD during action planning in humans. Some of these studies showed different levels of ERD according to different types of action preparation. Especially, the literature suggests that variations in cognitive factors rather than physical factors (force, direction, etc modulate the level of beta-ERD. We hypothesized that the level of beta-band power will differ according to planning of different categorical sequences. We measured magnetoencephalography (MEG from 22 subjects performing 11 four-sequence actions--each consisting of one or two of three simple actions--in 3 categories; 'Paired (ooxx', 'Alternative (oxox' and 'Repetitive (oooo' ('o' and 'x' each denoting one of three simple actions. Time-frequency representations were calculated for each category during the planning period, and the corresponding beta-power time-courses were compared. We found beta-ERD during the planning period for all subjects, mostly in the contralateral fronto-parietal areas shortly after visual cue onset. Power increase (transient rebound followed ERD in 20 out of 22 subjects. Amplitudes differed among categories in 20 subjects for both ERD and transient rebound. In 18 out of 20 subjects 'Repetitive' category showed the largest ERD and rebound. The current result suggests that beta-ERD in the contralateral frontal/motor/parietal areas during planning is differentiated by the category of action sequences.

  15. Integrated action planning for biodiversity conservation and sustainable use of highland aquatic resources

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Luo, S.; Cai, K.

    2016-01-01

    The need for enhanced environmental planning and management for highland aquatic resources is described and rationale for integrated action planning presented. Past action planning initiatives for biodiversity conservation and wetland management are reviewed. A reflective account is given...... of integrated action planning from five sites in China, India and Vietnam. Eight planning phases are described encompassing: stakeholder assessment and partner selection; rapport building and agreement on collaboration; integrated biodiversity, ecosystem services, livelihoods and policy assessment; problem...... analysis and target setting; strategic planning; planning and organisation of activities; coordinated implementation and monitoring; evaluation and revised target-setting. The scope and targeting of actions was evaluated using the DPSIR framework and compatibility with biodiversity conservation and socio...

  16. Causal model of safety-checking action of the staff of nuclear power plants and the organization climate

    International Nuclear Information System (INIS)

    Fukui, Hirokazu; Yoshida, Michio; Yamaura, Kazuho

    2000-01-01

    For those who run an organization, it is critical to identify the causal relationship between the organization's characteristics and the safety-checking action of its staff, in order to effectively implement activities for promoting safety. In this research. a causal model of the safety-checking action was developed and factors affecting it were studied. A questionnaire survey, which includes safety awareness, attitude toward safety, safety culture and others, was conducted at three nuclear power plants and eight factors were extracted by means of factor analysis of the questionnaire items. The extracted eight interrelated factors were as follows: work norm, supervisory action, interest in training, recognition of importance, safety-checking action, the subject of safety, knowledge/skills, and the attitude of an organization. Among them, seven factors except the recognition of importance were defined as latent variables and a causal model of safety-checking action was constructed. By means of covariance structure analysis, it was found that the three factors: the attitude of an organization, supervisory action and the subject of safety, have a significant effect on the safety-checking action. Moreover, it was also studied that workplaces in which these three factors are highly regarded form social environment where safety-checking action is fully supported by the workplace as a whole, while workplaces in which these three factors are poorly regarded do not fully form social environment where safety-checking action is supported. Therefore, the workplaces form an organizational environment where safety-checking action tends to depend strongly upon the knowledge or skills of individuals. On top of these, it was noted that the attitude of an organization and supervisory action are important factors that serve as the first trigger affecting the formation of the organizational climate for safety. (author)

  17. Causal model of safety-checking action of the staff of nuclear power plants and the organization climate

    Energy Technology Data Exchange (ETDEWEB)

    Fukui, Hirokazu [Institute of Nuclear Safety System Inc., Seika, Kyoto (Japan); Yoshida, Michio; Yamaura, Kazuho [Japan Institute for Group Dynamics, Fukuoka (Japan)

    2000-09-01

    For those who run an organization, it is critical to identify the causal relationship between the organization's characteristics and the safety-checking action of its staff, in order to effectively implement activities for promoting safety. In this research. a causal model of the safety-checking action was developed and factors affecting it were studied. A questionnaire survey, which includes safety awareness, attitude toward safety, safety culture and others, was conducted at three nuclear power plants and eight factors were extracted by means of factor analysis of the questionnaire items. The extracted eight interrelated factors were as follows: work norm, supervisory action, interest in training, recognition of importance, safety-checking action, the subject of safety, knowledge/skills, and the attitude of an organization. Among them, seven factors except the recognition of importance were defined as latent variables and a causal model of safety-checking action was constructed. By means of covariance structure analysis, it was found that the three factors: the attitude of an organization, supervisory action and the subject of safety, have a significant effect on the safety-checking action. Moreover, it was also studied that workplaces in which these three factors are highly regarded form social environment where safety-checking action is fully supported by the workplace as a whole, while workplaces in which these three factors are poorly regarded do not fully form social environment where safety-checking action is supported. Therefore, the workplaces form an organizational environment where safety-checking action tends to depend strongly upon the knowledge or skills of individuals. On top of these, it was noted that the attitude of an organization and supervisory action are important factors that serve as the first trigger affecting the formation of the organizational climate for safety. (author)

  18. Can patient involvement improve patient safety? A cluster randomised control trial of the Patient Reporting and Action for a Safe Environment (PRASE) intervention.

    Science.gov (United States)

    Lawton, Rebecca; O'Hara, Jane Kathryn; Sheard, Laura; Armitage, Gerry; Cocks, Kim; Buckley, Hannah; Corbacho, Belen; Reynolds, Caroline; Marsh, Claire; Moore, Sally; Watt, Ian; Wright, John

    2017-08-01

    To evaluate the efficacy of the Patient Reporting and Action for a Safe Environment intervention. A multicentre cluster randomised controlled trial. Clusters were 33 hospital wards within five hospitals in the UK. All patients able to give informed consent were eligible to take part. Wards were allocated to the intervention or control condition. The ward-level intervention comprised two tools: (1) a questionnaire that asked patients about factors contributing to safety (patient measure of safety (PMOS)) and (2) a proforma for patients to report both safety concerns and positive experiences (patient incident reporting tool). Feedback was considered in multidisciplinary action planning meetings. Primary outcomes were routinely collected ward-level harm-free care (HFC) scores and patient-level feedback on safety (PMOS). Intervention uptake and retention of wards was 100% and patient participation was high (86%). We found no significant effect of the intervention on any outcomes at 6 or 12 months. However, for new harms (ie, those for which the wards were directly accountable) intervention wards did show greater, though non-significant, improvement compared with control wards. Analyses also indicated that improvements were largest for wards that showed the greatest compliance with the intervention. Adherence to the intervention, particularly the implementation of action plans, was poor. Patient safety outcomes may represent too blunt a measure. Patients are willing to provide feedback about the safety of their care. However, we were unable to demonstrate any overall effect of this intervention on either measure of patient safety and therefore cannot recommend this intervention for wider uptake. Findings indicate promise for increasing HFC where wards implement ≥75% of the intervention components. ISRCTN07689702; pre-results. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  19. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices

  20. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  1. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  2. Action plan against declining vineyards: An innovative approach

    Directory of Open Access Journals (Sweden)

    Riou Christophe

    2016-01-01

    Full Text Available Declining vineyards are assessed by a multi-year decrease in vine productivity and/or its sudden premature or gradual death, based on multiple factors. Since 2015, the French wine sector has been working on an original study to identify new research avenues while launching an innovative action plan to combat vineyard decline. First, a statistical analysis enabled to estimate research efforts in the different countries. 70 factors susceptible to contribute to vineyard decline were then identified by analyzing more than 500 publications. These factors are biological, physical or linked to growing practices. While the role of pathogens is fairly well-known, the impact of the land plot or the soil on decline is less understood. Secondly, a prospective methodology was used to better identify viticulture system factors and levers affecting vines. It was thus demonstrated that yield and longevity are strongly linked to agronomy, economic variables and plant matter, plant physiology, disease, etc... These are the key issues and leverage actions to combat more strongly vineyard decline. The matrix analysis was then complemented by interviews and statistical data to imagine leverage actions. The strategic action plan is focused on four objectives: promoting training of good practices, improving plant production organization, developing vineyard observation networks, implementing an innovative research plan.

  3. Quality assurance project plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    This quality assurance project plan defines project organization and roles of responsibility, sampling and field procedures, sample documentation and chain-of-custody protocols, equipment calibration, analytical procedures, data reduction and validation, and internal quality control procedures for the former YS-860 Firing Ranges removal action at the Oak Ridge Y-12 Plant. The ENTECH Team will maintain the highest standards to ensure strict compliance with this plan. Implementation of this plan will include consideration of the technical, as well as administrative, aspects of activities affecting quality. Plan implementation is based on the premise that quality controls selected for each element of work are consistent with the risk, importance, and health and safety considerations of performing the work. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of two small arms firing ranges. This plan covers the removal action at the former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification sampling, grading, and revegetation

  4. Prairie Conservation in Canada: The Prairie Conservation Action Plan Experience

    Science.gov (United States)

    Dean Nernberg; David Ingstrup

    2005-01-01

    In Canada, grassland conservation has been mobilized and directed through the development of Prairie Conservation Action Plans and Action Plan Committees in the three prairie provinces of Alberta (45 partner agencies and organizations), Saskatchewan (26 partners), and Manitoba (26 partners). In Alberta, 43 percent of the native prairie remains; in Saskatchewan and...

  5. Sanitation health risk and safety planning in urban residential ...

    African Journals Online (AJOL)

    The aim of this review paper was to determine the best sanitation health risk and safety planning approach for sustainable management of urban environment. This was achieved by reviewing the concept of sanitation safety planning as a tool. The review adopted exploratory research approach and used secondary data ...

  6. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 413: Clean Slate II Plutonium Dispersion (TTR) Tonopah Test Range, Nevada. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2017-05-01

    This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitate site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and

  7. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  8. Putting Action Back into Action Planning: Experiences of Career Clients

    Science.gov (United States)

    Borgen, William A.; Maglio, Asa-Sophia T.

    2007-01-01

    This study used the critical incident technique to investigate what helped and hindered unemployed and career-changing people in implementing the action plans they developed while participating in career or employment counseling. Information from interviews with 23 women and 16 men generated 9 categories of helping incidents and 9 categories of…

  9. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative

  10. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the

  11. Workshop on the preparation of climate change action plans. Workshop summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  12. Action plan for 1965, Annex 2; Prilog br. 2 - Plan zadataka u 1965. godini

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-12-15

    Action plan presented in this annex includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building. [Serbo-Croat] Plan zadataka obuhvata aktivnosti masinske i elektro grupe na preventivnom odrzavanju i planskom remontu sistema teske vode, sistema tehnicke vode, sistema helijuma, centralnog tela reaktora, sistema grejanja i ventilacije, sistema za snabdevanje elektricnom energijom, i ostalih pomocnih sistema u zgradi reaktora RA.

  13. Corrective Action Investigation Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    ITLV

    1999-01-01

    The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation

  14. Feedback from incident reporting: information and action to improve patient safety.

    Science.gov (United States)

    Benn, J; Koutantji, M; Wallace, L; Spurgeon, P; Rejman, M; Healey, A; Vincent, C

    2009-02-01

    Effective feedback from incident reporting systems in healthcare is essential if organisations are to learn from failures in the delivery of care. Despite the wide-scale development and implementation of incident reporting in healthcare, studies in the UK suggest that information concerning system vulnerabilities could be better applied to improve operational safety within organisations. In this article, the findings and implications of research to identify forms of effective feedback from incident reporting are discussed, to promote best practices in this area. The research comprised a mixed methods review to investigate mechanisms of effective feedback for healthcare, drawing upon experience within established reporting programmes in high-risk industry and transport domains. Systematic searches of published literature were undertaken, and 23 case studies describing incident reporting programmes with feedback were identified for analysis from the international healthcare literature. Semistructured interviews were undertaken with 19 subject matter experts across a range of domains, including: civil aviation, maritime, energy, rail, offshore production and healthcare. In analysis, qualitative information from several sources was synthesised into practical requirements for developing effective feedback in healthcare. Both action and information feedback mechanisms were identified, serving safety awareness, improvement and motivational functions. The provision of actionable feedback that visibly improved systems was highlighted as important in promoting future reporting. Fifteen requirements for the design of effective feedback systems were identified, concerning: the role of leadership, the credibility and content of information, effective dissemination channels, the capacity for rapid action and the need for feedback at all levels of the organisation, among others. Above all, the safety-feedback cycle must be closed by ensuring that reporting, analysis and

  15. 78 FR 51754 - Request To Modify License by Replacing Security Plan With New Radiation Safety Plan; U.S...

    Science.gov (United States)

    2013-08-21

    ... Replacing Security Plan With New Radiation Safety Plan; U.S. Department of the Army, Jefferson Proving... security plan with a new radiation safety plan. DATES: Submit comments by September 20, 2013. Requests for.... The proposed change is to modify License Condition No. 12 D which refers to the security plan of...

  16. Safety research plan, JFY 2013 edition

    International Nuclear Information System (INIS)

    2013-09-01

    As for the regulatory issues the governments or JNES considered necessary, JNES had updated every year 'safety research plan' in respective research areas necessary for solving the regulatory issues (safety research needs) and was conducting safety research to obtain the results, etc. 'Safety research plan, JFY 2013 Edition' was compiled aiming at promotion of appropriate reflection and flexible application of research achievements for tacking the regulatory issues taking account of importance and urgency dependent on trend of nuclear safety regulations as well as collective management of safety research and safety survey. 5 new research projects were established with 4 unified research projects and 6 terminated research projects. Finally modified safety research areas, subjects and research projects, JFY 2013 Edition were as follows: design review of nuclear power plant (7 subjects and each subject having several research projects totaled 19), control management of nuclear power plant (one subject having 4 research projects), nuclear fuel cycle (2 subjects and each subject having several research projects totaled 4), nuclear fuel cycle backend (2 subjects and each subject having several research projects totaled 5), nuclear emergency preparedness and response (3 subjects and each subject having several research projects totaled 7) and bases of nuclear safety technology (3 subjects and each subject having several research projects totaled 6). Safety reviews consisted of 6 projects in 3 areas extracting the regulatory issues. As for urgent research projects on the basis of the disaster at Fukushima Daiichi NPP accident, 7 research projects in 4 urgent subjects were as follows: examination for new safety regulation (4 research projects generalized in the above research projects), development of newly necessary evaluation methods (one research project generalized in the above research project), evaluation of the validity for the work for convergence at Fukushima

  17. Disentangling self-management goal setting and action planning: A scoping review.

    Directory of Open Access Journals (Sweden)

    Stephanie Anna Lenzen

    Full Text Available The ongoing rise in the numbers of chronically ill people necessitates efforts for effective self-management. Goal setting and action planning are frequently used, as they are thought to support patients in changing their behavior. However, it remains unclear how goal setting and action planning in the context of self-management are defined in the scientific literature. This study aimed to achieve a better understanding of the various definitions used.A scoping review was conducted, searching PubMed, Cinahl, PsychINFO and Cochrane. Inclusion and exclusion criteria were formulated to ensure the focus on goal setting/action planning and self-management. The literature was updated to December 2015; data selection and charting was done by two reviewers. A qualitative content analysis approach was used.Out of 9115 retrieved articles, 58 met the inclusion criteria. We created an overview of goal setting phases that were applied (preparation, formulation of goals, formulation of action plan, coping planning and follow-up. Although the phases we found are in accordance with commonly known frameworks for goal setting, it was striking that the majority of studies (n = 39, 67% did not include all phases. We also prepared an overview of components and strategies for each goal setting phase. Interestingly, few strategies were found for the communication between patients and professionals about goals/action plans. Most studies (n = 35, 60% focused goal setting on one single disease and on a predefined lifestyle behavior; nearly half of the articles (n = 27, 47% reported a theoretical framework.The results might provide practical support for developers of interventions. Moreover, our results might encourage professionals to become more aware of the phases of the goal setting process and of strategies emphasizing on patient reflection. However, more research might be useful to examine strategies to facilitate communication about goals/action plans. It might

  18. Safety plan for the cooperative telerobotic retrieval system equipment development area

    Energy Technology Data Exchange (ETDEWEB)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A).

  19. Safety plan for the cooperative telerobotic retrieval system equipment development area

    International Nuclear Information System (INIS)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A)

  20. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  1. Predicting Plan Failure by Monitoring Action Sequences and Duration

    Directory of Open Access Journals (Sweden)

    Giovani Parente FARIAS

    2017-07-01

    Full Text Available An agent can attempt to achieve multiple goals and each goal can be achieved by applying various different plans. Anticipating failures in agent plan execution is important to enable an agent to develop strategies to avoid or circumvent such failures, allowing the agent to achieve its goal. Plan recognition can be used to infer which plans are being executed from observations of sequences of activities being performed by an agent. Symbolic Plan Recognition is an algorithm that represents knowledge about the agents under observation in the form of a plan library. In this work, we use this symbolic algorithm to find out which plan the agent is performing and we develop a failure prediction system, based on information available in the plan library and in a simplified calendar which manages the goals the agent has to achieve. This failure predictor is able to monitor the sequence of agent actions and detects if an action is taking too long or does not match the plan that the agent was expected to be performing. We have successfully employed this approach in a health-care prototype system.

  2. Action planning and position sense in children with Developmental Coordination Disorder

    NARCIS (Netherlands)

    Adams, I.L.; Ferguson, G.D.; Lust, J.M.; Steenbergen, B.; Smits-Engelsman, B.C.M.

    2016-01-01

    The present study examined action planning and position sense in children with Developmental Coordination Disorder (DCD). Participants performed two action planning tasks, the sword task and the bar grasping task, and an active elbow matching task to examine position sense. Thirty children were

  3. A Study of Time Response for Safety-Related Operator Actions in Non-LOCA Safety Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Min Seok; Lee, Sang Seob; Park, Min Soo; Lee, Gyu Cheon; Kim, Shin Whan [KEPCO E and C Company, Daejeon (Korea, Republic of)

    2014-10-15

    The classification of initiating events for safety analysis report (SAR) chapter 15 is categorized into moderate frequency events (MF), infrequent events (IF), and limiting faults (LF) depending on the frequency of its occurrence. For the non-LOCA safety analysis with the purpose to get construction or operation license, however, it is assumed that the operator response action to mitigate the events starts at 30 minutes after the initiation of the transient regardless of the event categorization. Such an assumption of corresponding operator response time may have over conservatism with the MF and IF events and results in a decrease in the safety margin compared to its acceptance criteria. In this paper, the plant conditions (PC) are categorized with the definitions in SAR 15 and ANS 51.1. Then, the consequence of response for safety-related operator action time is determined based on the PC in ANSI 58.8. The operator response time for safety analysis regarding PC are reviewed and suggested. The clarifying alarm response procedure would be required for the guideline to reduce the operator response time when the alarms indicate the occurrence of the transient.

  4. 24 CFR 91.220 - Action plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.220 Section 91.220 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development..., evaluate and reduce lead-based paint hazards, reduce the number of poverty-level families, develop...

  5. 24 CFR 91.320 - Action plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.320 Section 91.320 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development...), evaluate and reduce lead-based paint hazards, reduce the number of poverty level families, develop...

  6. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Contents of a Safety Integration Plan. 244.11 Section 244.11 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD...

  7. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    Science.gov (United States)

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  8. Remedial action and waste disposal project: 100-B/C remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-06-01

    The Readiness Evaluation Plan presents the methodology used to assess the readiness of the 100-B/C Remedial Action Project. The 100 Areas Remedial Action Project will remediate the 100 Areas liquid waste site identified in the Interim Action Record of Decision for the 100- BC-1, 100-DR-1, and 100-HR-1 Operable Units. These sites are located in the 100 Area of the Hanford Site in Richland, Washington

  9. HACCP and water safety plans in Icelandic water supply: preliminary evaluation of experience.

    Science.gov (United States)

    Gunnarsdóttir, María J; Gissurarson, Loftur R

    2008-09-01

    Icelandic waterworks first began implementing hazard analysis and critical control points (HACCP) as a preventive approach for water safety management in 1997. Since then implementation has been ongoing and currently about 68% of the Icelandic population enjoy drinking water from waterworks with a water safety plan based on HACCP. Preliminary evaluation of the success of HACCP implementation was undertaken in association with some of the waterworks that had implemented HACCP. The evaluation revealed that compliance with drinking water quality standards improved considerably following the implementation of HACCP. In response to their findings, waterworks implemented a large number of corrective actions to improve water safety. The study revealed some limitations for some, but not all, waterworks in relation to inadequate external and internal auditing and a lack of oversight by health authorities. Future studies should entail a more comprehensive study of the experience with the use of HACCP with the purpose of developing tools to promote continuing success.

  10. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2010-01-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative

  11. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2010-11-22

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed

  12. 36 CFR 72.13 - Action plan.

    Science.gov (United States)

    2010-07-01

    ... objectives, priorities and implementation strategies in relation to the intent of the Urban Park and... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK...

  13. Tank farm health and safety plan. Revision 2

    International Nuclear Information System (INIS)

    Mickle, G.D.

    1995-01-01

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, open-quotes Health and Safety Programs for Hazardous Waste Operations;close quotes 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved

  14. Tank farm health and safety plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Mickle, G.D.

    1995-03-29

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, {open_quotes}Health and Safety Programs for Hazardous Waste Operations;{close_quotes} 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved.

  15. 29 CFR 1926.35 - Employee emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all...) Names or regular job titles of persons or departments who can be contacted for further information or... the employee in the event of an emergency. The written plan shall be kept at the workplace and made...

  16. Validation and verification plan for safety and PRA codes

    International Nuclear Information System (INIS)

    Ades, M.J.; Crowe, R.D.; Toffer, H.

    1991-04-01

    This report discusses a verification and validation (V ampersand V) plan for computer codes used for safety analysis and probabilistic risk assessment calculations. The present plan fulfills the commitments by Westinghouse Savannah River Company (WSRC) to the Department of Energy Savannah River Office (DOE-SRO) to bring the essential safety analysis and probabilistic risk assessment codes in compliance with verification and validation requirements

  17. Action plans can interact to hinder or facilitate reach performance.

    Science.gov (United States)

    Fournier, Lisa R; Wiediger, Matthew D; Taddese, Ezana F

    2015-11-01

    Executing a reach action can be delayed while retaining another action in working memory (WM) if the two action plans partly overlap rather than do not overlap. This delay (partial repetition cost) occurs when reach responses are under cognitive control. In this study, we investigated whether facilitation (a partial repetition benefit) occurs when reach responses are automatic. We also examined whether the hemisphere controlling the limb or selection of the preferred limb (based on a free-reach task) influences reach performance when the actions partly overlap. Left- and right-handers reached to different stimulus locations to the left and right of body midline with their ipsilateral hand while maintaining an action plan in WM that required the same or the different hand. The results showed a partial repetition benefit for spatially compatible reaches to left and right stimulus locations far from the body midline, but not for those near the body midline. Also, no partial repetition cost was found at any of the stimulus-reach locations. This indicates that automatic reach responses that partly overlap with an action plan maintained in WM are not delayed, but instead can be facilitated (partial repetition benefit). The roles of hemisphere and reach-hand preference in action control and the importance of the degree of feature overlap in obtaining a partial repetition benefit (and cost) are discussed.

  18. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    2003-02-01

    The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are

  19. Electronuclear's safety culture assessment and enhancement program

    International Nuclear Information System (INIS)

    Selvatici, E.; Diaz-Francisco, J.M.; Diniz de Souza, V.

    2002-01-01

    The present paper describes the Eletronuclear's safety culture assessment and enhancement program. The program was launched by the company's top management one year after the creation of Eletronuclear in 1997, from the merging of two companies with different organizational cultures, the design and engineering company Nuclen and the nuclear directorate of the Utility Furnas, Operator of the Angra1 NPP. The program consisted of an assessment performed internally in 1999 with the support and advice of the IAEA. This assessment, performed with the help of a survey, pooled about 80% of the company's employees. The overall result of the assessment was that a satisfactory level of safety culture existed; however, a number of points with a considerable margin for improvement were also identified. These points were mostly related with behavioural matters such as motivation, stress in the workplace, view of mistakes, handling of conflicts, and last but not least a view by a considerable number of employees that a conflict between safety and production might exist. An Action Plan was established by the company managers to tackle these weak points. This Plan was issued as company guideline by the company's Directorate. The subsequent step was to detail and implement the different actions of the Plan, which is the phase that we are at present. In the detailing of the Action Plan, special care was taken to sum up efforts, avoiding duplication of work or competition with already existing programs. In this process it was identified that the company had a considerable number of initiatives directly related to organizational and safety culture improvement, already operational. These initiatives have been integrated in the detailed Action Plan. A new assessment, for checking the effectiveness of the undertaken actions, is planned for 2003. (author)

  20. Nuclear Safety through International Cooperation

    International Nuclear Information System (INIS)

    Flory, Denis

    2013-01-01

    The Fukushima Daiichi nuclear accident was the worst at a nuclear facility since the Chernobyl accident in 1986. It caused deep public anxiety and damaged confidence in nuclear power. Following this accident, strengthening nuclear safety standards and emergency response has become an imperative at the global level. The IAEA is leading in developing a global approach, and the IAEA Action Plan on Nuclear Safety is providing a comprehensive framework and acting as a significant driving force to identify lessons learned and to implement safety improvements. Strengthening nuclear safety is addressed through a number of measures proposed in the Action Plan including 12 main actions focusing on safety assessments in the light of the accident. Significant progress has been made in assessing safety vulnerabilities of nuclear power plants, strengthening the IAEA's peer review services, improvements in emergency preparedness and response capabilities, strengthening and maintaining capacity building, as well as widening the scope and enhancing communication and information sharing with Member States, international organizations and the public. Progress has also been made in reviewing the IAEA's safety standards, which continue to be widely applied by regulators, operators and the nuclear industry in general, with increased attention and focus on accident prevention, in particular severe accidents, and emergency preparedness and response.

  1. Hawaii State Plan for Occupational Safety and Health. Final rule.

    Science.gov (United States)

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  2. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  3. Environment, Safety, Health and Waste Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Feed Materials Production Center (FMPC) is the production of high qaulity uranium metal for use by the US Department of Energy (DOE) in Defense Programs. In order to accomplish this mission and to maintain the FMPC as a viable facility in the DOE production complex, the facility must be brought into full compliance with all federal and state regulations and industry standards for environmental protection and worker safety. Where past practices have resulted in environmental insult, a comprehensive program of remediation must be implemented. The purpose of this combined Environment, Safety, Health and Waste Management Plan is to provide a road map for achieving needed improvements. The plan is structured to provide a comprehensive projection from the current fiscal year (FY) through FY 1994 of the programs, projects and funding required to achieve compliance. To do this, the plan is subdivided into chapters which discuss the applicable regulations;project schedules and funding requirements;details of the various programs for environment, safety, health and waste management;details of the ongoing National Environmental Policy Act (NEPA);the quality assurance program and the environmental monitoring program. 14 refs., 30 figs., 29 tabs

  4. 77 FR 42462 - Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval

    Science.gov (United States)

    2012-07-19

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1952 [Docket ID. OSHA 2012-0029] RIN 1218-AC78 Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval AGENCY: Occupational Safety and Health Administration (OSHA), Department of...

  5. Protecting drinkable water: an analysis of action plans and stakeholders' networks

    Science.gov (United States)

    Gascuel-Odoux, Chantal; Menard, Marjorie

    2015-04-01

    Since WFD the policy for protecting drinkable water has been enhanced in France. This policy establish the main components and the different steps for protecting drinkable water, and ask for defining and implementing an action plan for each contributing catchment. Despite ambitious objectives, the local implementation is difficult. Firstly there is a high diversity of stakeholders involved with local authorities, which are mainly: water agencies, agricultural chambers and consultants, authorities at regional and departmental levels. Most of the local authorities do not feel qualified enough for carrying out such a policy, as they are not really used to deal with technical and political issues related to agricultural diffuse pollutions. As a consequence assessed action plans are based on regulation and/or agri-environmental measures. More ambitious and complementary measures can be included, but without any support measure nor accurate objectives for their implementation. In the end, action plans reflect more a formal implementation of protection approaches than a search for efficiency by defining ambitious measures and the setting-up a consistent support scheme. The way stakeholders' networks mobilize knowledge have been analyzed based on ten case studies located in three different regions. Three local authorities profiles are defined: (1) the "passive" ones, not really convinced of the necessity to undertake actions against diffuse pollutions and/or having low level of knowledge to support local reflexion, that delegate project management; (2) the local authorities that support local protection approach but that, for different reasons, do not search for an effective action plan, and that only consider an improvement approach; (3) the local authorities that more rarely, aim at efficient actions, motivated by the urgent need of action for preserving threatened resources. According to these profiles, local authorities and their project coordinators will be looking

  6. 12 CFR 30.4 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... steps the bank will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance plans. Within 30 days after receiving a safety and... AND SOUNDNESS STANDARDS § 30.4 Filing of safety and soundness compliance plan. (a) Schedule for filing...

  7. Simplifying documentation while approaching site closure: integrated health and safety plans as documented safety analysis

    International Nuclear Information System (INIS)

    Brown, Tulanda

    2003-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). By isolating any remediation activities that deal with Enriched Restricted Materials, the SBRs and PRs assure that the hazard categories of former nuclear facilities undergoing remediation remain less than Nuclear. These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 150 structures, including six major nuclear production plants. This paper presents the FCP method for maintaining safety basis documentation, using the D and D I-HASP as an example

  8. Alternative development and action plan for the atomic safety regulation instruments

    International Nuclear Information System (INIS)

    Kim, J. Y.; Ahn, S. K.; Ham, Y. S.

    2004-01-01

    The goal of this study to provide highly practical model to regulation agency. Since nuclear power safety regulation has different characteristics, compared to general regulation, it is important to have new point of view and approach. But application possibility for regulation that guarantees the 'perfect safety' is very low. Therefore, it is important establish nuclear power safety regulation that is realistic as well as safety securing. In order to establish high quality regulation, evaluation of existing regulation must be done first. Thus in this study, 6 standards to evaluate existing regulation are suggested. They are clearness, efficiency, flexibility, reliability, responsibility and political consideration. Also, strategies to complement the weak points of regulatory governance, regulatory sunset, regulatory map, regulatory negotiation, regulatory benefit cost analysis, etc. These strategies can be applied all in one regulation, and can strategically be selected for application. After analyzing the result if case analysis on nuclear furnace regulation for research study, agreement was made that it is most efficient to consider in the order if clearness reliability, flexibility, confidence, political consideration, administrative efficiency and economic efficiency

  9. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  10. Readability, suitability, and characteristics of asthma action plans: examination of factors that may impair understanding.

    Science.gov (United States)

    Yin, H Shonna; Gupta, Ruchi S; Tomopoulos, Suzy; Wolf, Michael S; Mendelsohn, Alan L; Antler, Lauren; Sanchez, Dayana C; Lau, Claudia Hillam; Dreyer, Benard P

    2013-01-01

    Recognition of the complexity of asthma management has led to the development of asthma treatment guidelines that include the recommendation that all pediatric asthma patients receive a written asthma action plan. We assessed the readability, suitability, and characteristics of asthma action plans, elements that contribute to the effectiveness of action plan use, particularly for those with limited literacy. This was a descriptive study of 30 asthma action plans (27 state Department of Health (DOH)-endorsed, 3 national action plans endorsed by 6 states). (1) readability (as assessed by Flesch Reading Ease, Flesch-Kincaid, Gunning Fog, Simple Measure of Gobbledygook, Forcast), (2) suitability (Suitability Assessment of Materials [SAM], adequate: ≥ 0.4; unsuitable: typography (30.0%), learning stimulation/motivation (26.7%), and graphics (13.3%). There were no statistically significant differences between the average grade level or SAM score of state DOH developed action plans and those from or adapted from national organizations. Plans varied with respect to terms used, symptoms included, and recommended actions. Specific improvements in asthma action plans could maximize patient and parent understanding of appropriate asthma management and could particularly benefit individuals with limited literacy skills.

  11. L-038: EPR-First Responders: Forces / safety equipment. Action Guides

    International Nuclear Information System (INIS)

    2011-01-01

    This conference is about the actions carry out by the forces and the safety equipment in a radiological emergency. The security area, the victims, the hospitals, the police vehicles area, the safety cordon, the evacuation, the contamination level and the risk of life are important aspects to be considered by the first responders.

  12. Revised action plan of the Maintenance division for 1965, Annex 4

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-01-01

    The action plan presented in this annex is a revised version of the plan adopted in January 1965. It includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building [sr

  13. ORD Strategic Action Plan for Information Management / Information Technology 2011

    Science.gov (United States)

    ORD's Strategic Action Plan for IM/IT (2011) was collaboratively developed with input from ORD research and administrative personnel. It identifies actions necessary to support ORD's priority IM and IT needs.

  14. 9 CFR 417.3 - Corrective actions.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...

  15. Yearly plan of safety research on environmental radioactivity for 1996 - 2000

    International Nuclear Information System (INIS)

    1996-01-01

    'Yearly Plan of Safety Research on Environmental Radioactivity' proposed from the special meeting for safety research of environmental radioactivity on December 14, 1995 was investigated by Nuclear Safety Commission. And the safety research of environmental radioactivity in Japan was decided to be pursued according to the plan. The contents of this plan consisted of the purpose and the contents of research as well as the research period and the facilities to be done for each theme. The following themes were included; 1) study on environment·radiation dose and study on radiation exposure reduction. 2) study on biological effects of radiation. 3) study on internal exposure by specified nuclides. 4) study on medical measures for acute radiation exposure. 5) study on assessment of nuclear safety. 6) investigation on radioactivities released from various nuclear facilities in Japan to demonstrate their safety. (M.N.)

  16. Electric driving accelerated. Action Plan 2011-2015. Annex 2

    International Nuclear Information System (INIS)

    2011-10-01

    The Dutch Action Plan for Electric Driving gives form and substance to the ambition of the Dutch government to accelerate the market introduction of electric cars in the Netherlands. This plan is not only focused on the electric passenger car. To promote the electrification of transport, also electric garbage trucks, buses, scooters and possibly pleasure boats are included in the plan. [nl

  17. Committee on the safety of nuclear installations - Operating plan (2006 - 2009)

    International Nuclear Information System (INIS)

    2007-01-01

    In 2004, NEA issued its Strategic Plan covering the period 2005-2009, addressing the NEA activities associated with nuclear safety and regulation. Committee on the Safety of Nuclear Installations (CSNI) and Committee on Nuclear Regulatory Activities (CNRA), which have the primary responsibility for activities in this area, have developed and issued a joint strategic plan covering this same time period. As requested in the Joint Strategic Plan, each committee is to prepare an operating plan which describes in more detail the committee's organisation, planned activities, priorities and operating procedures to be used to implement the Joint Strategic Plan. In effect, the Joint Strategic Plan defines what type of work CSNI should do, whereas the Operating Plan describes the overall work scope and how to accomplish it to meet the joint CSNI/CNRA Strategic Plan objectives and mission. The present Operating Plan follows and takes into account the outcome of a CSNI assessment group, which has evaluated the CSNI activities. The assessment group expressed appreciation for the CSNI role and activity, while making recommendations with regards to scope of work and way to operate in order to further improve efficiency. The main objectives of CSNI are to: - Keep all member countries involved in and abreast of developments in safety technology. - Review operating experience with the objective to identify safety issues that need to be addressed by new research. - Review the state-of-knowledge on selected topics of nuclear safety technology and safety assessment. - Promote training and research projects that serve to maintain competence in nuclear safety matters. - Promote research as needed to reach consensus on nuclear safety issues of common interest. - Consider the safety implications of scientific and technical developments. To accomplish these objectives, CSNI is organised into six permanent working groups (as described in Section II), each covering a different set of

  18. The Search Conference as a Method in Planning Community Health Promotion Actions

    Science.gov (United States)

    Magnus, Eva; Knudtsen, Margunn Skjei; Wist, Guri; Weiss, Daniel; Lillefjell, Monica

    2016-01-01

    Aims: The aim of this article is to describe and discuss how the search conference can be used as a method for planning health promotion actions in local communities. Design and methods: The article draws on experiences with using the method for an innovative project in health promotion in three Norwegian municipalities. The method is described both in general and how it was specifically adopted for the project. Results and conclusions: The search conference as a method was used to develop evidence-based health promotion action plans. With its use of both bottom-up and top-down approaches, this method is a relevant strategy for involving a community in the planning stages of health promotion actions in line with political expectations of participation, ownership, and evidence-based initiatives. Significance for public health This article describe and discuss how the Search conference can be used as a method when working with knowledge based health promotion actions in local communities. The article describe the sequences of the conference and shows how this have been adapted when planning and prioritizing health promotion actions in three Norwegian municipalities. The significance of the article is that it shows how central elements in the planning of health promotion actions, as participation and involvements as well as evidence was a fundamental thinking in how the conference were accomplished. The article continue discussing how the method function as both a top-down and a bottom-up strategy, and in what way working evidence based can be in conflict with a bottom-up strategy. The experiences described can be used as guidance planning knowledge based health promotion actions in communities. PMID:27747199

  19. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    1999-01-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document

  20. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    USDOE/NV

    1999-05-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document.

  1. Driving change : sustainable development action plans Guidance

    OpenAIRE

    Sustainable Development Commission

    2008-01-01

    This guidance builds upon the Sustainable Development Commission’s previous guidance, Getting Started (August 2005), which set out the basic elements that the Sustainable Development Commission would expect to see in a good Sustainable Development Action Plan. Publisher PDF Original published August 2005.

  2. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Science.gov (United States)

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  3. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine Nevada National Security Site, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro, Las Vegas, NV (United States)

    2017-08-01

    This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigation (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.

  4. A national action plan for workforce development in behavioral health.

    Science.gov (United States)

    Hoge, Michael A; Morris, John A; Stuart, Gail W; Huey, Leighton Y; Bergeson, Sue; Flaherty, Michael T; Morgan, Oscar; Peterson, Janice; Daniels, Allen S; Paris, Manuel; Madenwald, Kappy

    2009-07-01

    Across all sectors of the behavioral health field there has been growing concern about a workforce crisis. Difficulties encompass the recruitment and retention of staff and the delivery of accessible and effective training in both initial, preservice training and continuing education settings. Concern about the crisis led to a multiphased, cross-sector collaboration known as the Annapolis Coalition on the Behavioral Health Workforce. With support from the Substance Abuse and Mental Health Services Administration, this public-private partnership crafted An Action Plan for Behavioral Health Workforce Development. Created with input from a dozen expert panels, the action plan outlines seven core strategic goals that are relevant to all sectors of the behavioral health field: expand the role of consumers and their families in the workforce, expand the role of communities in promoting behavioral health and wellness, use systematic recruitment and retention strategies, improve training and education, foster leadership development, enhance infrastructure to support workforce development, and implement a national research and evaluation agenda. Detailed implementation tables identify the action steps for diverse groups and organizations to take in order to achieve these goals. The action plan serves as a call to action and is being used to guide workforce initiatives across the nation.

  5. The neural basis of predicting the outcomes of planned actions

    Directory of Open Access Journals (Sweden)

    Andrew eJahn

    2011-11-01

    Full Text Available A key feature of human intelligence is the ability to predict the outcomes of one’s own actions prior to executing them. Action values are thought to be represented in part in the dorsal and ventral medial prefrontal cortex, yet current studies have focused on the value of executed actions rather than the anticipated value of a planned action. Thus, little is known about the neural basis of how individuals think (or fail to think about their actions and the potential consequences before they act. We scanned individuals with fMRI while they thought about performing actions that they knew would likely be correct or incorrect. Here we show that merely imagining an error, as opposed to imagining a correct outcome, increases activity in the dorsal anterior cingulate cortex, independently of subsequent actions. This activity overlaps with regions that respond to actual error commission. The findings show a distinct network that signals the prospective outcomes of one’s planned actions. A number of clinical disorders such as schizophrenia and drug abuse involve a failure to take the potential consequences of an action into account prior to acting. Our results thus suggest how dysfunctions of the medial prefrontal cortex may contribute to such failures.

  6. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  7. Heart Truth for Women: An Action Plan

    Science.gov (United States)

    ... only treatment that some people need. Kick the Smoking Habit There is nothing easy about giving up cigarettes, but with a plan of action, you can do it. Become aware of your personal smoking “triggers”—the situations that typically bring on the ...

  8. Structural priming, action planning, and grammar.

    Science.gov (United States)

    MacDonald, Maryellen C; Weiss, Daniel J

    2017-01-01

    Structural priming is poorly understood and cannot inform accounts of grammar for two reasons. First, those who view performance as grammar + processing will always be able to attribute psycholinguistic data to processing rather than grammar. Second, structural priming may be simply an example of hysteresis effects in general action planning. If so, then priming offers no special insight into grammar.

  9. Implementing 10 CFR 830 at the FEMP Silos: Nuclear Health and Safety Plans as Documented Safety Analysis

    International Nuclear Information System (INIS)

    Fisk, Patricia; Rutherford, Lavon

    2003-01-01

    The objective of the Silos Project at the Fernald Closure Project (FCP) is to safely remediate high-grade uranium ore residues (Silos 1 and 2) and metal oxide residues (Silo 3). The evolution of Documented Safety Analyses (DSAs) for these facilities has reflected the changes in remediation processes. The final stage in silos DSAs is an interpretation of 10 CFR 830 Safe Harbor Requirements that combines a Health and Safety Plan with nuclear safety requirements. This paper will address the development of a Nuclear Health and Safety Plan, or N-HASP

  10. Action plan for photovoltaic standards

    Energy Technology Data Exchange (ETDEWEB)

    Oldach, R.

    1999-07-01

    This report examines the present situation regarding international standards governing photovoltaic (PV) systems and components, and seeks to identify barriers to the commercialisation of PV systems in the UK due to the absence of standards and codes of practice, and develop an action plan to overcome these barriers. An overview of standardisation bodies and standard generation mechanisms is presented, and the PV cells and modules, stand-alone PV systems, utility interconnection with PV systems, and building integration of PV are reviewed.

  11. The impact of participation in strategic planning and action planning on management control effectiveness: An analysis of independent and joint effects

    OpenAIRE

    Bedford, David S.; Bednark, Piotr; Dossi, Andrea; Ditillo, Angelo; Gosselin, Maurice; Madsen, Dag Øivind

    2016-01-01

    This research paper examines the independent and joint effects of participation in strategic planning and action planning. There is extensive research about employee participation in both the fields of strategic planning and budgeting. However, there is a lack of research about the interaction between participation in strategic planning and budgeting. Drawing on the research on participation in decision-making processes, the hypothesis is that strategic planning and action plan...

  12. The Extrastriate Body Area Computes Desired Goal States during Action Planning.

    Science.gov (United States)

    Zimmermann, Marius; Verhagen, Lennart; de Lange, Floris P; Toni, Ivan

    2016-01-01

    How do object perception and action interact at a neural level? Here we test the hypothesis that perceptual features, processed by the ventral visuoperceptual stream, are used as priors by the dorsal visuomotor stream to specify goal-directed grasping actions. We present three main findings, which were obtained by combining time-resolved transcranial magnetic stimulation and kinematic tracking of grasp-and-rotate object manipulations, in a group of healthy human participants (N = 22). First, the extrastriate body area (EBA), in the ventral stream, provides an initial structure to motor plans, based on current and desired states of a grasped object and of the grasping hand. Second, the contributions of EBA are earlier in time than those of a caudal intraparietal region known to specify the action plan. Third, the contributions of EBA are particularly important when desired and current object configurations differ, and multiple courses of actions are possible. These findings specify the temporal and functional characteristics for a mechanism that integrates perceptual processing with motor planning.

  13. 12 CFR 704.10 - Investment action plan.

    Science.gov (United States)

    2010-01-01

    ... market pricing, cash flows, and risk; (3) How the investment fits into the credit union's asset and... Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS CORPORATE CREDIT UNIONS § 704.10 Investment action plan. (a) Any corporate credit union in possession of an...

  14. Plan d'action pour la conservation des espèces d'oiseaux inscrites ...

    African Journals Online (AJOL)

    This List includes fifteen species of bird, and at the thirteenth Conference of the Parties in Catania, Sicily in November 2003, an Action Plan for the conservation of these species was adopted, following similar plans on monk seal, marine turtles, cetaceans and marine vegetation. The Action Plan for Birds notes initiatives ...

  15. Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

  16. The future of road safety: A worldwide perspective

    Directory of Open Access Journals (Sweden)

    Fred Wegman

    2017-03-01

    The future of road safety is uncertain and definitely not the same for all regions of the world. Countries with a mature road safety approach and an ambition to make further progress are expected to move in the direction of a pro-active approach: a Safe System approach. It is reported that many LMIC, meanwhile, are on the brink of designing road safety strategies and implementing action plans. The international community is willing to support LMIC, but LMIC cannot simply copy successful HIC strategies because local circumstances differ. The principles of successful HIC strategies are applicable, but the priorities and action plans should take root in and align with local conditions.

  17. The evolving role and care management approaches of safety-net Medicaid managed care plans.

    Science.gov (United States)

    Gusmano, Michael K; Sparer, Michael S; Brown, Lawrence D; Rowe, Catherine; Gray, Bradford

    2002-12-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods, we studied these "safety-net" health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also found that, based on a partnership with providers, safety-net plans are moving toward more sophisticated efforts to manage the care of their enrollees. Our study suggests that, with supportive state policies, safety-net plans are capable of remaining viable. Contracting with safety-net plans may not be an efficient mechanism for enabling Medicaid recipients to "enter the mainstream of American health care," but it may provide states with an effective way to manage and coordinate the care of Medicaid recipients, while helping to maintain the health care safety-net for the uninsured.

  18. Smoking Cessation in Cardiac Patients: The Influence of Action Plans, Coping Plans and Self-Efficacy on Quitting Smoking

    Science.gov (United States)

    de Hoog, Natascha; Bolman, Catherine; Berndt, Nadine; Kers, Esther; Mudde, Aart; de Vries, Hein; Lechner, Lilian

    2016-01-01

    Smoking cessation is the most effective action for cardiac patients who smoke to improve their prognosis, yet more than one-half of cardiac patients continue to smoke after hospital admission. This study examined the influence of action plans, coping plans and self-efficacy on intention to quit and smoking cessation in cardiac patients. Cardiac…

  19. Reactor safety research program. A description of current and planned reactor safety research sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research

    International Nuclear Information System (INIS)

    1975-06-01

    The reactor safety research program, sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, is described in terms of its program objectives, current status, and future plans. Elements of safety research work applicable to water reactors, fast reactors, and gas cooled reactors are presented together with brief descriptions of current and planned test facilities. (U.S.)

  20. National Biofuels Action Plan, October 2008

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  1. 29 CFR 1608.4 - Establishing affirmative action plans.

    Science.gov (United States)

    2010-07-01

    ... taken pursuant to an affirmative action plan or program must be reasonable in relation to the problems... remedy the situation. Such steps, which in design and execution may be race, color, sex or ethnic...

  2. An action plan for radioactive substances regulation

    International Nuclear Information System (INIS)

    1998-01-01

    This document sets out an action plan for the Agency's Radioactive Substances Regulation function. Our vision is to secure continuous improvement in the protection of the public and the environment from the harmful effects of radioactive substances. Radioactive Substances Regulation will work with others to realise this vision and contribute to the Agency's role in achieving sustainable development. We will also work to ensure that the Agency achieves its objectives in an efficient, consistent and integrated way. The main elements of our Action Plan are as follows: establishing indicators of sustainability and the means and methods of monitoring them; establishing performance indicators and a programme of targets and objectives to be achieved; establishing a database of all premises subject to RSA93 and to use it for work planning, resource targeting, and improvement to radioactive waste management; provision of systems of procedures and technical guidance to ensure nationally consistent and cost- effective regulation; establishing systems to audit the implementation of the procedures and guidance; ensuring quality of regulation by defining technical competencies of inspectors and the training programmes to secure them; an R and D programme targeted on improving radioactive waste management and radioactive substances regulation; and full and effective participation in development of national policy

  3. Aspects you should consider in your action plan when implementing an improvement strategy

    DEFF Research Database (Denmark)

    Carstensen, Peter; Vinter, Otto

    2017-01-01

    Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature that is the found......Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature...

  4. Tactical Action Plan: Powering the Energy Frontier (An Appendix to the Strategic Roadmap 2024)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-01-01

    The Tactical Action Plan identifies and describes the Western-wide tasks and activities, existing and new, needed to fully achieve the goals in Strategic Roadmap 2024. Each activity in the TAP chart is briefly described in this document and also linked to the Critical Pathway it supports. As the TAP is a list of specific strategies and actions susceptible to changing environments and needs, the TAP will be updated more frequently as Western progresses towards its goals. The TAP is organized into seven Strategic Target Areas that serve as Western’s priorities and areas of focus for the next two to three years. These Target Areas are: Power and Transmission Related Services; Energy Infrastructure; Partnership and Innovation; Asset Management; Safety and Security; Communication; and Human Capital Management and Organization Structure. Target Areas are also used to create the agency’s annual performance targets, which measure progress and implementation of the TAP, and the status of which will be reported regularly.

  5. Transit green building action plan : report to congress

    Science.gov (United States)

    2009-06-04

    The explanatory statement accompanying the fiscal year 2009 Omnibus appropriations : act1 directed the Federal Transit Administration (FTA) to submit a transit facility green : building action plan to the House and Senate Committees on Appropriati...

  6. Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Flynn, N.C. Bechtel Jacobs

    2008-04-21

    The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable

  7. Prioritization of generic safety issues

    International Nuclear Information System (INIS)

    Emrit, R.; Minners, W.; VanderMolen, H.

    1983-12-01

    This report presents the priority rankings for generic safety issues related to nuclear power plants. The purpose of these rankings is to assist in the timely and efficient allocation of NRC resources for the resolution of those safety issues that have a significant potential for reducing risk. The report focuses on the prioritization of generic safety issues. Issues primarily concerned with the licensing process or environmental protection and not directly related to safety have been excluded from prioritization. The prioritized issues include: TMI Action Plan items under development; previously proposed issues covered by Task Action Plans, except issues designated at Unresolved Safety Issues (USIs) which had already been assigned high priority; and newly-proposed issues. Future supplements to this report will include the prioritization of additional issues. The safety priority rankings are HIGH, MEDIUM, LOW, and DROP and have been assigned on the basis of risk significance estimates, the ratio of risk to costs and other impacts estimated to result if resolutions of the safety issues were implemented, and the consideration of uncertainties and other quantitative or qualitative factors. To the extent practical, estimates are quantitative

  8. Using Action Plans to Support Communication Programming for Children Who Are Deafblind

    Science.gov (United States)

    Bruce, Susan M.

    2008-01-01

    The author describes the use of action plans to support 2 teachers' post-in-service implementation of communication strategies with 3 children who are deafblind. In the action plans, the teachers recorded changes in thinking and instructional practices under the 4 aspects of communication: form, function, content, and context. They also recorded…

  9. Unresolved safety issues summary: aqua book

    International Nuclear Information System (INIS)

    1983-06-01

    The unresolved safety issues summary is designed to provide the management of the nuclear regulatory commission with a quarterly overview of the progress and plans for completion of generic tasks addressing unresolved safety issues reported to congress pursuant to section 210 of the Energy Reorganization Act of 1974 as amended. The schedules in this book include a milestone at the end of each action plan which represents the initiation of the implementation process both with respect to incorporation of the technical resolution in the NRC official guidance or requirements and also the application of changes to individual operating plants. The schedule for implementation will not normally be included in the task action plan(s) for the resolution of a USI since the nature and extent of the activities necessary to accomplish the implementation cannot normally be reasonably determined prior to the determination of a technical resolution. The progress and status for implementation of unresolved safety issues for which a technical resolution has been completed are reported specifically in a separate table provided in this summary

  10. Application of risk assessment in upgrading safety and quality of radiochemical operations

    International Nuclear Information System (INIS)

    Lin, K.H.; Hightower, J.R.; Vaughen, V.C.A.

    1990-01-01

    A Comprehensive Safety Assessment and Upgrade Program (CSAUP) was commenced by the Chemical Technology Division (Chem Tech) at Oak Ridge National Laboratory (ORNL) to achieve excellence in the safety and quality of its operations and condition of its facilities. In the course of conducting CSAUP, a number of issues of concern were identified. The safety risk of these issues has been assessed, and planned actions were prepared for those issues that require corrective actions or improvement/upgrading. The planned actions were evaluated on consideration for the uniqueness of Chem Tech facilities and operations to determine the risks (high, moderate or low) involved by failure to implement the actions. The risk was defined in terms of the frequency and severity of impact. Priority of categorized actions was based on the urgency of the actions. 2 refs., 1 fig., 3 tabs

  11. NRC action plan developed as a result of the TMI-2 accident. Volume 2

    International Nuclear Information System (INIS)

    1980-05-01

    The Action Plan provides a comprehensive and integrated plan for all actions judged necessary by the Nuclear Regulatory Commission to correct or improve the regulation and operation of nuclear facilities based on the experience from the accident at the Three Mile Island, Unit 2, nuclear facility and the official studies and investigations of the accident. The tables included in this volume list the recommendations from the various organizations and task forces investigating the accident at Three Mile Island. The tables are annotated to provide easy references to the associated parts of the Action Plan in Volume 1. The tables are also annotated to provide a shorthand indication of how the various recommendations are treated in the Action Plan

  12. Water safety plan at the Saharawi refugee camps in Tindouf (Algeria

    Directory of Open Access Journals (Sweden)

    R. García

    2018-01-01

    Full Text Available Since 1975, about 165,000 people from Western Sahara are living as refugees in the Sahara Desert near Tindouf (Algeria. Available water resources come from deep boreholes located up to tens of kilometers away from the settlements of the population, bulk water is treated in reverse osmosis plants and by chlorination systems and, after, distributed through a network of taps and water tankers. Water supply system complexity and extreme conditions force the elaboration of a Water Safety Plan, aiming to guarantee appropriate provision and quality of water. The plan follows a risk assessment methodology and establishes control mechanisms to minimize risk impacts, which are compiled in six action protocols for infrastructures and water quality monitoring. As a novel contribution, the proposed methodology developed in the refugee camps incorporates besides the conventional water quality assessment concepts, the analysis of the volume of supplied water, linked with some water-washed diseases. Since the end of 2014, those protocols have begun to be applied obtaining results that have a positive effect on the life quality of refugees.

  13. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within 90...

  14. Personality Traits and Training Initiation Process: Intention, Planning, and Action Initiation.

    Science.gov (United States)

    Laguna, Mariola; Purc, Ewelina

    2016-01-01

    The article aims at investigating the role of personality traits in relation to training initiation. Training initiation is conceptualized as a goal realization process, and explained using goal theories. There are three stages of the process analyzed: intention to undertake training, plan formulation, and actual training undertaking. Two studies tested the relationships between five personality traits, defined according to the five factor model, and the stages of the goal realization process. In Study 1, which explains training intention and training plans' formulation, 155 employees participated. In Study 2, which was time-lagged with two measurement points, and which explains intention, plans, and training actions undertaken, the data from 176 employees was collected at 3 month intervals. The results of these studies show that personality traits, mainly openness to experience, predict the training initiation process to some degree: intention, plans, and actual action initiation. The findings allow us to provide recommendations for practitioners responsible for human resource development. The assessment of openness to experience in employees helps predict their motivation to participate in training activities. To increase training motivation it is vital to strengthen intentions to undertake training, and to encourage training action planning.

  15. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    International Nuclear Information System (INIS)

    Haagenstad, T.

    1999-01-01

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility

  16. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  17. Evaluation procedure of software safety plan for digital I and C of KNGR

    International Nuclear Information System (INIS)

    Lee, Jang Soo; Park, Jong Kyun; Lee, Ki Young; Kwon, Ki Choon; Kim, Jang Yeol; Cheon, Se Woo

    2000-05-01

    The development, use, and regulation of computer systems in nuclear reactor instrumentation and control (I and C) systems to enhance reliability and safety is a complex issue. This report is one of a series of reports from the Korean next generation reactor (KNGR) software safety verification and validation (SSVV) task, Korea Atomic Energy Research Institute, which investigates different aspects of computer software in reactor I and C systems, and describes the engineering procedures for developing such a software. The purpose of this guideline is to give the software safety evaluator the trail map between the code and standards layer and the design methodology and documents layer for the software important to safety in nuclear power plants. Recently, the safety planning for safety-critical software systems is being recognized as the most important phase in the software life cycle, and being developed new regulatory positions and standards by the regulatory and the standardization organizations. The requirements for software important to safety of nuclear reactor are described in such positions and standards, for example, the new standard review plan (SRP), IEC 880 supplements, IEEE standard 1228-1994, IEEE standard 7-4.3.2-1993, and IAEA safety series No. 50-SG-D3 and D8. We presented the guidance for evaluating the safety plan of the software in the KNGR protection systems. The guideline consists of the regulatory requirements for software safety in chapter 2, the evaluation checklist of software safety plan in chapter3, and the evaluation results of KNGR software safety plan in chapter 4

  18. Evaluation procedure of software safety plan for digital I and C of KNGR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jang Soo; Park, Jong Kyun; Lee, Ki Young; Kwon, Ki Choon; Kim, Jang Yeol; Cheon, Se Woo

    2000-05-01

    The development, use, and regulation of computer systems in nuclear reactor instrumentation and control (I and C) systems to enhance reliability and safety is a complex issue. This report is one of a series of reports from the Korean next generation reactor (KNGR) software safety verification and validation (SSVV) task, Korea Atomic Energy Research Institute, which investigates different aspects of computer software in reactor I and C systems, and describes the engineering procedures for developing such a software. The purpose of this guideline is to give the software safety evaluator the trail map between the code and standards layer and the design methodology and documents layer for the software important to safety in nuclear power plants. Recently, the safety planning for safety-critical software systems is being recognized as the most important phase in the software life cycle, and being developed new regulatory positions and standards by the regulatory and the standardization organizations. The requirements for software important to safety of nuclear reactor are described in such positions and standards, for example, the new standard review plan (SRP), IEC 880 supplements, IEEE standard 1228-1994, IEEE standard 7-4.3.2-1993, and IAEA safety series No. 50-SG-D3 and D8. We presented the guidance for evaluating the safety plan of the software in the KNGR protection systems. The guideline consists of the regulatory requirements for software safety in chapter 2, the evaluation checklist of software safety plan in chapter3, and the evaluation results of KNGR software safety plan in chapter 4.

  19. Ending on a positive: Examining the role of safety leadership decisions, behaviours and actions in a safety critical situation.

    Science.gov (United States)

    Donovan, Sarah-Louise; Salmon, Paul M; Horberry, Timothy; Lenné, Michael G

    2018-01-01

    Safety leadership is an important factor in supporting safe performance in the workplace. The present case study examined the role of safety leadership during the Bingham Canyon Mine high-wall failure, a significant mining incident in which no fatalities or injuries were incurred. The Critical Decision Method (CDM) was used in conjunction with a self-reporting approach to examine safety leadership in terms of decisions, behaviours and actions that contributed to the incidents' safe outcome. Mapping the analysis onto Rasmussen's Risk Management Framework (Rasmussen, 1997), the findings demonstrate clear links between safety leadership decisions, and emergent behaviours and actions across the work system. Communication and engagement based decisions featured most prominently, and were linked to different leadership practices across the work system. Further, a core sub-set of CDM decision elements were linked to the open flow and exchange of information across the work system, which was critical to supporting the safe outcome. The findings provide practical implications for the development of safety leadership capability to support safety within the mining industry. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. [Implementation of a safety and health planning system in a teaching hospital].

    Science.gov (United States)

    Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P

    2007-01-01

    University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.

  1. Action Planning Mediates Guidance of Visual Attention from Working Memory.

    Science.gov (United States)

    Feldmann-Wüstefeld, Tobias; Schubö, Anna

    2015-01-01

    Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM) content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing) and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton) was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles), thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  2. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  3. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    International Nuclear Information System (INIS)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE's overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program

  4. 77 FR 16862 - Proposed Information Collection Request; Training, Training Plans, and Records

    Science.gov (United States)

    2012-03-22

    ...; Training, Training Plans, and Records AGENCY: Mine Safety and Health Administration, Labor. ACTION: Request... proposed extension of the information collection related to training, training plans, and records at these.... Agency: Mine Safety and Health Administration. Title: Part 46--Training, Training Plans, and Records. OMB...

  5. Watershed planning, implementation and assessment: the May River Watershed Action Plan case study

    Science.gov (United States)

    Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie

    2016-01-01

    Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...

  6. Affirmative Action Plans, January 1, 1994--December 31, 1994. Revision

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-16

    This document is the Affirmative Action Plan for January 1, 1994 through December 31, 1994 for the Lawrence Berkeley Laboratory, University of California (``LBL`` or ``the Laboratory.``) This is an official document that will be presented upon request to the Office of Federal Contract Compliance Programs, US Department of Labor. The plan is prepared in accordance with the Executive Order 11246 and 41 CFR Section 60-1 et seq. covering equal employment opportunity and will be updated during the year, if appropriate. Analyses included in this volume as required by government regulations are based on statistical comparisons. All statistical comparisons involve the use of geographic areas and various sources of statistics. The geographic areas and sources of statistics used here are in compliance with the government regulations, as interpreted. The use of any geographic area or statistic does not indicate agreement that the geographic area is the most appropriate or that the statistic is the most relevant. The use of such geographic areas and statistics is intended to have no significance outside the context of this Affirmative Action Plan, although, of course, such statistics and geographic areas will be used in good faith with respect to this Affirmative Action Plan.

  7. Long-term storage of radioactive waste: IAEA perspectives on safety and sustainability

    International Nuclear Information System (INIS)

    Rowat, J.H.; Louvat, D.; Metcalf, P.E.

    2006-01-01

    As the amounts of radioactive waste in surface storage have increased, concern has grown over the safety and sustainability of storage in the long term. In response to increasing concerns, the International Atomic Energy Agency (IAEA) has included an action to address the safety implications of the long-term storage (LTS) of radioactive waste in its action plan for waste safety; the action plan was endorsed by the IAEA's Member States in 2001. In 2003, the IAEA published a position paper on the safety and sustainability of LTS as part fulfilment of the action in question. A key theme of the position paper is the contrast of safety and sustainability implications of LTS with those of disposal. The present paper provides a summary of the position paper, describes current IAEA activities that deal with the subject of LTS, and discusses findings from the 2004 Cordoba symposium on disposal of low activity radioactive waste that pertain to LTS. (author)

  8. Education issues in disaster medicine: summary and action plan.

    Science.gov (United States)

    Armour, S J; Bastone, P; Birnbaum, M; Garrett, C; Greenough, P G; Manni, C; Ninomiya, N; Renderos, J; Rottman, S; Sahni, P; Shih, C L; Siegel, D; Younggren, B

    2001-01-01

    Change must begin with education. Theme 8 explored issues that need attention in Disaster Medicine education. Details of the methods used are provided in the introductory paper. The chairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. The chairs then presided over a workshop that resulted in the generation of a set of action plans that then were reported to the collective group of all delegates. Main points developed during the presentations and discussion included: (1) formal education, (2) standardized definitions, (3) integration, (4) evaluation of programs and interventions, (5) international cooperation, (6) identifying the psychosocial consequences of disaster, (7) meaningful research, and (8) hazard, impact, risk and vulnerability analysis. Three main components of the action plans were identified as evaluation, research, and education. The action plans recommended that: (1) education on disasters should be formalized, (2) evaluation of education and interventions must be improved, and (3) meaningful research should be promulgated and published for use at multiple levels and that applied research techniques be the subject of future conferences. The one unanimous conclusion was that we need more and better education on the disaster phenomenon, both in its impacts and in our response to them. Such education must be increasingly evidence-based.

  9. A plan for safety and integrity of research reactor components

    International Nuclear Information System (INIS)

    Moatty, Mona S. Abdel; Khattab, M.S.

    2013-01-01

    Highlights: ► A plan for in-service inspection of research reactor components is put. ► Section XI of the ASME Code requirements is applied. ► Components subjected to inspection and their classes are defined. ► Flaw evaluation and its acceptance–rejection criteria are reviewed. ► A plan of repair or replacement is prepared. -- Abstract: Safety and integrity of a research reactor that has been operated over 40 years requires frequent and thorough inspection of all the safety-related components of the facility. The need of increasing the safety is the need of improving the reliability of its systems. Diligent and extensive planning of in-service inspection (ISI) of all reactor components has been imposed for satisfying the most stringent safety requirements. The Safeguards Officer's responsibilities of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code ASME Code have been applied. These represent the most extensive and time-consuming part of ISI program, and identify the components subjected to inspection and testing, methods of component classification, inspection and testing techniques, acceptance/rejection criteria, and the responsibilities. The paper focuses on ISI planning requirements for welded systems such as vessels, piping, valve bodies, pump casings, and control rod-housing parts. The weld in integral attachments for piping, pumps, and valves are considered too. These are taken in consideration of safety class (1, 2, 3, etc.), reactor age, and weld type. The parts involve in the frequency of inspection, the examination requirements for each inspection, the examination method are included. Moreover the flaw evaluation, the plan of repair or replacement, and the qualification of nondestructive examination personnel are considered

  10. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Kilmer, J.

    1997-08-01

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided, this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.

  11. Westcoast Energy Inc. VCR action plan

    International Nuclear Information System (INIS)

    1998-01-01

    Westcoast Energy Inc. comprises a group of 14 major natural gas and petroleum companies from Canada and the United States. Climate change is a key strategic issue for the group. This paper represents their first consolidated Voluntary Challenge and Registry (VCR) action plan and includes updated information for the seven Westcoast companies which have previously filed individual action plans with the VCR office. Westcoast is involved in gathering and distribution of natural gas to more than one million consumers in Canada, and strongly supports a voluntary approach to meet Canada's commitment to reduce greenhouse gas emissions. Westcoast believes that market-based measures are the most effective and least-expensive way of addressing climate change issues. Key actions undertaken by Westcoast in 1996 were: (1) the creation of a climate change employee awareness program, (2) the development of greenhouse gas emissions inventories, (3) the use of new technologies and methods to reduce greenhouse gas emissions, (4) the development and use of end-user energy efficiency programs, and (5) support for research and pilot scale projects aimed at market-based approaches. In 1996, Westcoast emission from operational sources were 8,201 kt CO 2 equivalent. Emissions from operational sources represent an increase of 42 per cent over 1990 emissions. The main reason for these higher emissions is the increased market demand for natural gas which has resulted in the expansion of Westcoast operations. The demand for natural gas is expected to remain high because natural gas offers low carbon intensity compared to other fossil fuels. Future actions to reduce greenhouse gas emissions include gas storage in abandoned pipelines, a corporation-wide greenhouse gas emission reduction workshop, use of dry low NO x turbine combustion technology, advanced pipeline technology, acid gas reinjection, improvements in data tracking and capture, co-generation, recovery of landfill methane, and support

  12. Safety Standards Plan for Middlesex County Vocational & Technical High Schools.

    Science.gov (United States)

    Sommer, Cy

    This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…

  13. Developing a vision and strategic action plan for future community-based residency training.

    Science.gov (United States)

    Skelton, Jann B; Owen, James A

    2016-01-01

    The Community Pharmacy Residency Program (CPRP) Planning Committee convened to develop a vision and a strategic action plan for the advancement of community pharmacy residency training. Aligned with the profession's efforts to achieve provider status and expand access to care, the Future Vision and Action Plan for Community-based Residency Training will provide guidance, direction, and a strategic action plan for community-based residency training to ensure that the future needs of community-based pharmacist practitioners are met. National thought leaders, selected because of their leadership in pharmacy practice, academia, and residency training, served on the planning committee. The committee conducted a series of conference calls and an in-person strategic planning meeting held on January 13-14, 2015. Outcomes from the discussions were supplemented with related information from the literature. Results of a survey of CPRP directors and preceptors also informed the planning process. The vision and strategic action plan for community-based residency training is intended to advance training to meet the emerging needs of patients in communities that are served by the pharmacy profession. The group anticipated the advanced skills required of pharmacists serving as community-based pharmacist practitioners and the likely education, training and competencies required by future residency graduates in order to deliver these services. The vision reflects a transformation of community residency training, from CPRPs to community-based residency training, and embodies the concept that residency training should be primarily focused on training the individual pharmacist practitioner based on the needs of patients served within the community, and not on the physical location where pharmacy services are provided. The development of a vision statement, core values statements, and strategic action plan will provide support, guidance, and direction to the profession of pharmacy to

  14. Increasing advance personal planning: the need for action at the community level.

    Science.gov (United States)

    Waller, Amy; Sanson-Fisher, Rob; Ries, Nola; Bryant, Jamie

    2018-05-09

    Advance personal planning is the process by which people consider, document and communicate their preferences for personal, financial and health matters in case they lose the ability to make decisions or express their wishes in the future. Advance personal planning is most often undertaken by individuals who are seriously ill, often in the context of a medical crisis and/or at the time of admission to hospital. However, the clinical utility and legal validity of the planning process may be compromised in these circumstances. Patients may lack sufficient capacity to meaningfully engage in advance personal planning; there may be insufficient time to adequately reflect on and discuss wishes with key others; and there may also be limited opportunity for inter-professional input and collaboration in the process. Here, we propose an agenda for research to advance the science of advance personal planning by promoting a 'whole community' approach. Adoption of advance personal planning at a community level may be achieved using a variety of strategies including public media campaigns, intervening with professionals across a range of health care and legal settings, and mobilising support from influential groups and local government. One potentially promising method for encouraging earlier adoption of advance personal planning among a broader population involves a community action approach, whereby multiple evidence-based strategies are integrated across multiple access points. Community action involves calling on community members, professionals, community and/or government organisations to work collaboratively to design and systematically implement intervention strategies with the aim of bringing about desired behaviour change. An example of a community action trial to improving uptake and quality of advance personal planning is described. While promising, there is a need for rigorous evidence to demonstrate whether a community action approach is effective in

  15. Preparing US community greenhouse gas inventories for climate action plans

    International Nuclear Information System (INIS)

    Blackhurst, Michael; Scott Matthews, H; Hendrickson, Chris T; Sharrard, Aurora L; Azevedo, Ines Lima

    2011-01-01

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  16. Preparing US community greenhouse gas inventories for climate action plans

    Energy Technology Data Exchange (ETDEWEB)

    Blackhurst, Michael [Department of Civil, Architectural and Environmental Engineering, The University of Texas at Austin, 1 University Station C1752, Austin, TX 78712-0276 (United States); Scott Matthews, H; Hendrickson, Chris T [Department of Civil and Environmental Engineering, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States); Sharrard, Aurora L [Green Building Alliance, 333 East Carson Street, Suite 331, Pittsburgh, PA 15219 (United States); Azevedo, Ines Lima, E-mail: mblackhurst@gmail.com, E-mail: hsm@cmu.edu, E-mail: auroras@gbapgh.org, E-mail: cth@andrew.cmu.edu, E-mail: iazevedo@cmu.edu [Department of Engineering and Public Policy, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States)

    2011-07-15

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  17. National action plan 2016-2019 for the management of the radon-related risk

    International Nuclear Information System (INIS)

    Mortureux, Marc; Vallet, Benoit; Struillou, Yves; Girometti, Laurent

    2017-01-01

    After a brief presentation of the context, and a presentation of aspects related to the plan governance and strategies (plan steering, actors in the radon risk management, synthesis of main actions in France, regulatory evolutions and new strategies), this report presents the three axes of the national action plan for 2016-2019. The first one consists in the implementation of a global strategy of information and in developing tools to collect and share information. The second one consists in a continuous knowledge improvement. The third one consists in a better taking into account of radon risk management in buildings. Sheets are then proposed which describe the various actions associated with these axes (5 actions for the first one, 10 for the second, and 5 for the third one). Each sheet comprises the action title, its objectives, methods and tools, its coordinator and actors, its agenda and current status

  18. The advanced neutron source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1989-01-01

    The Advanced Neutron Source (ANS) is a user facility for all areas of neutron research proposed for construction at the Oak Ridge National Laboratory. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements [which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies] into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences. 8 refs., 2 tabs

  19. The Advanced Neutron Source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1990-01-01

    The Advanced Neutron Source (ANS) is a user facility proposed for construction at the Oak Ridge National Laboratory for all areas of neutron research. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements (which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies) into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences

  20. Experiences in assessing safety culture

    International Nuclear Information System (INIS)

    Spitalnik, J.

    2002-01-01

    Based on several Safety Culture self-assessment applications in nuclear organisations, the paper stresses relevant aspects to be considered when programming an assessment of this type. Reasons for assessing Safety Culture, basic principles to take into account, necessary resources, the importance of proper statistical analyses, the feed-back of results, and the setting up of action plans to enhance Safety Culture are discussed. (author)

  1. Russian MINATOM nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    1999-03-01

    The 'Safety Research Strategic Plan for Russian Nuclear Power Plants' was published in draft form at the Russian International Nuclear Safety Centre (RINSC) by a working group of fifteen senior Russian experts. The Plan consists of 12 chapters, each addressing a specific technical area and containing a number of proposed research programmes and projects to advance the state-of-knowledge in that area. In part because a strong Recommendation to undertake such a Plan was made by the 1998 OECD/NEA study, the OECD Nuclear Energy Agency was asked by the Director of RINSC and the Director of USINSC to organize an international review of the Plan when the English-language version became available in October, 1998. This report represents the results of that review. (R.P.)

  2. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    2002-05-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  3. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    1999-09-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  4. SAFETY AND SECURITY IMPROVEMENT IN PUBLIC TRANSPORTATION BASED ON PUBLIC PERCEPTION IN DEVELOPING COUNTRIES

    Directory of Open Access Journals (Sweden)

    Tri Basuki JOEWONO

    2006-01-01

    Three aspects of an improvement agenda are proposed based on the perception data, namely technology, management, and institution. This agenda is clarified by a set of action plans incorporating the responsible parties and a time frame. The action plan is divided into three terms to define a clear goal for each step. The short-term action focuses on the hardware and on preparing further steps, whereas the medium-term action focuses on developing and improving the standard of safety and security. The long-term action focuses on advancing safety and security practices. The effectiveness of this agenda and action plan rests upon a set of assumptions, such as the degree of seriousness from the authoritative institution, fair distribution of information, the availability of reasonable resources, and coordinated and collaborative action from all parties involved to reach the objective.

  5. Regulating nuclear and radiation safety in the frame of the Chernobyl shelter Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bykov, V.; Demchyuk, A.; Kilochitska, T.; Redko, V. [State Nuclear Regulatory Committee of Ukraine, SNRCU, Arsenalna St. 9/11, Kyiv (Ukraine); Bogorinski, P. [GRS/IPSN-RISKAUDIT, Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, Koeln (Germany); Vasilchenko, V.; Erickson, L.; Kadkin, E.; Kondratyev, S.; Kutina, L.; Smyshliaeva, S. [SSTC NRS, Stusa St. 35-37, 03142, Kyiv (Ukraine)

    2003-07-01

    Since 1998 the Shelter Implementation Plan (SIP) has been carried out on the Chernobyl NPP Unit 4 (the object Shelter - OS). The State Nuclear Regulatory Committee of Ukraine (SNRCU) recognizes the exceptional importance of successful and efficient SIP implementation and acts accordingly in regulation, licensing, and inspection. Technical support of the SNRCU in SIP licensing are provided by the State Scientific and Technical Center for Nuclear and Radiation Safety (SSTC) and the SIP Licensing Consultant (LC) representing RISKAUDIT IPSN/GRS International and SCIENTECH, Inc. Support of the SNRCU is also provided by the International Consultative Committee of Regulatory Bodies (ICCRB). ICCRB members represent regulatory authorities from nine European countries, Canada and the U.S. Summarizing the information above, it can be stated that a sound basis has been created for the licensing process for SIP. The approach for using the regulatory base has been determined. It ensures the establishment of safety objectives and gives ChNPP the freedom of optimal choice of specific technical decisions. The License has been issued for OS-related activities and a number of documents have been developed to conduct an effective and high quality authorization process: the Licensing Process; Recommendations on single SSR, Licensing Plan for SIP. The Order of State Safety Supervision for SIP has been approved. Working groups are functioning, whose purposes are to coordinate actions of participants in authorization activities, including ChNPP, SNRCU, and other RA.

  6. Regulating nuclear and radiation safety in the frame of the Chernobyl shelter Implementation Plan

    International Nuclear Information System (INIS)

    Bykov, V.; Demchyuk, A.; Kilochitska, T.; Redko, V.; Bogorinski, P.; Vasilchenko, V.; Erickson, L.; Kadkin, E.; Kondratyev, S.; Kutina, L.; Smyshliaeva, S.

    2003-01-01

    Since 1998 the Shelter Implementation Plan (SIP) has been carried out on the Chernobyl NPP Unit 4 (the object Shelter - OS). The State Nuclear Regulatory Committee of Ukraine (SNRCU) recognizes the exceptional importance of successful and efficient SIP implementation and acts accordingly in regulation, licensing, and inspection. Technical support of the SNRCU in SIP licensing are provided by the State Scientific and Technical Center for Nuclear and Radiation Safety (SSTC) and the SIP Licensing Consultant (LC) representing RISKAUDIT IPSN/GRS International and SCIENTECH, Inc. Support of the SNRCU is also provided by the International Consultative Committee of Regulatory Bodies (ICCRB). ICCRB members represent regulatory authorities from nine European countries, Canada and the U.S. Summarizing the information above, it can be stated that a sound basis has been created for the licensing process for SIP. The approach for using the regulatory base has been determined. It ensures the establishment of safety objectives and gives ChNPP the freedom of optimal choice of specific technical decisions. The License has been issued for OS-related activities and a number of documents have been developed to conduct an effective and high quality authorization process: the Licensing Process; Recommendations on single SSR, Licensing Plan for SIP. The Order of State Safety Supervision for SIP has been approved. Working groups are functioning, whose purposes are to coordinate actions of participants in authorization activities, including ChNPP, SNRCU, and other RA

  7. A prioritization of generic safety issues

    International Nuclear Information System (INIS)

    Emrit, R.; Riggs, R.; Milstead, W.; Pittman, J.

    1991-07-01

    This report presents the priority rankings for generic safety issues and related to nuclear power plants. The purpose of these rankings is to assist in the timely and efficient allocation of NRC resources for the resolution of those safety issues that have a significant potential for reducing risk. The report focuses on the prioritization of generic safety issues. Issues primarily concerned with the licensing process or environmental protection and not directly related to safety have been excluded from prioritization. The prioritized issues include: TMI Action Plan items under development; previously proposed issues covered by Task Action Plans, except issues designated as Un-resolved Safety Issues (USIs) which had already been assigned high priority; and newly-proposed issues. Future supplements to this report will include the prioritization of additional issues. The safety priority rankings are High, Medium, Low, and Drop and have been assigned on the basis of risk significance estimates, the ratio of risk to costs and other impacts estimated to result if resolutions of the safety issues were implemented, and the consideration of uncertainties and other quantitative or qualitative factors. To the extent practical, estimates are quantitative. 1310 refs

  8. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  9. Action Planning Mediates Guidance of Visual Attention from Working Memory

    Directory of Open Access Journals (Sweden)

    Tobias Feldmann-Wüstefeld

    2015-01-01

    Full Text Available Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles, thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  10. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  11. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report

  12. Planning and evaluation of plant under safety aspects

    International Nuclear Information System (INIS)

    Strnad, H.

    1985-01-01

    Plant denotes a technical product characterized as being structured, complex, comprising the use of energy, and that of measuring, automatic control and monitoring systems to keep track of present, control and monitor processes. Particular attention is paid to methods of developing plant concepts, measures to exclude or detect risks, integration of safety engineering into the course of planning, safety concept and ergonomics in plant design. (DG) [de

  13. Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A...Program Name Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A) DoD Component Air Force Responsible Office Program...APB) dated March 9, 2015 DCAPES Inc 2A 2016 MAR UNCLASSIFIED 4 Program Description Deliberate and Crisis Action Planning and Execution Segments

  14. Deliberate and Crisis Action Planning and Execution Segments Increment 2B (DCAPES Inc 2B)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Deliberate and Crisis Action Planning and Execution Segments Increment 2B (DCAPES Inc 2B...Information Program Name Deliberate and Crisis Action Planning and Execution Segments Increment 2B (DCAPES Inc 2B) DoD Component Air Force Responsible Office...been established. DCAPES Inc 2B 2016 MAR UNCLASSIFIED 4 Program Description Deliberate and Crisis Action Planning and Execution Segments (DCAPES) is

  15. Connecting the Dots--From Planning to Implementation: Translating Commitments into Action in a Strategic Planning Process

    Science.gov (United States)

    Mieso, Rob Roba

    2010-01-01

    This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…

  16. The search conference as a method in planning community health promotion actions

    Directory of Open Access Journals (Sweden)

    Eva Magnus

    2016-08-01

    Full Text Available Aims: The aim of this article is to describe and discuss how the search conference can be used as a method for planning health promotion actions in local communities. Design and methods: The article draws on experiences with using the method for an innovative project in health promotion in three Norwegian municipalities. The method is described both in general and how it was specifically adopted for the project. Results and conclusions: The search conference as a method was used to develop evidence-based health promotion action plans. With its use of both bottom-up and top-down approaches, this method is a relevant strategy for involving a community in the planning stages of health promotion actions in line with political expectations of participation, ownership, and evidence-based initiatives.

  17. Representation and Integration: Combining Robot Control, High-Level Planning, and Action Learning

    DEFF Research Database (Denmark)

    Petrick, Ronald; Kraft, Dirk; Mourao, Kira

    We describe an approach to integrated robot control, high-level planning, and action effect learning that attempts to overcome the representational difficulties that exist between these diverse areas. Our approach combines ideas from robot vision, knowledgelevel planning, and connectionist machine......-level action specifications, suitable for planning, from a robot’s interactions with the world. We present a detailed overview of our approach and show how it supports the learning of certain aspects of a high-level lepresentation from low-level world state information....... learning, and focuses on the representational needs of these components.We also make use of a simple representational unit called an instantiated state transition fragment (ISTF) and a related structure called an object-action complex (OAC). The goal of this work is a general approach for inducing high...

  18. National action plan 2011-2015 for the management of the radon-related risk. Assessment of the National action plan 2011-2015 for the management of the radon-related risk

    International Nuclear Information System (INIS)

    Grall, Jean-Yves; Crepon, Etienne; Combrexelle, Jean-Denis; Niel, Jean-Christophe

    2011-01-01

    After a presentation of the context, and a brief assessment of the previous national action plan (2005-2008), a first report presents the second national action plan for 2011-2015 with its 8 main axes (implementation of a policy for the management of radon-related risk in existing dwellings, implementation of a regulation for new dwellings, follow-up of the regulation for buildings open to public and of the regulations applied to workers, development of new management tools and of a new operational device to perform building diagnosis and to perform works by building professionals, coordination of the study and research policy) and its 8 main measures. After a synthetic presentation of actions, 30 sheets present the different actions associated with each axis. A second report proposes an assessment of these 30 actions

  19. Remedial Action Plan for Expanded Bioventing System Facility 6454

    National Research Council Canada - National Science Library

    1996-01-01

    This draft remedial action plan (RAP) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at Site 6454 at Vandenberg Air Force Base (AFB), California...

  20. Yampa River Valley sub-area contingency plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    The Yampa River Valley sub-area contingency plan (Contingency Plan) has been prepared for two counties in northwestern Colorado: Moffat County and Routt County. The Contingency Plan is provided in two parts, the Contingency Plan and the Emergency Response Action Plan (ERAP). The Contingency Plan provides information that should be helpful in planning to minimize the impact of an oil spill or hazardous material incident. It contains discussions of planning and response role, hazards identification, vulnerability analysis, risk analysis, cleanup, cost recovery, training, and health and safety. It includes information on the incident command system, notifications, response capabilities, emergency response organizations, evacuation and shelter-in-place, and immediate actions.

  1. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  2. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  3. Motivations for self-regulation: The clean air action plan

    International Nuclear Information System (INIS)

    Giuliano, Genevieve; Linder, Alison

    2013-01-01

    In the fall of 2006 the Ports of Long Beach and Los Angeles announced the Clean Air Action Plan (CAAP). Its intent was to greatly accelerate emissions reductions from port activities. The CAAP was unprecedented in several ways: it was a voluntary agreement between two competing ports; it was achieved with the cooperation of local, state and federal agencies; it promised large particulate emissions reductions along with continued port growth, and it had a price tag of $2.1 billion. What explains the Ports’ decision to implement the CAAP? We conduct a case study to explore alternative explanations for the CAAP. Using data from interviews, media, and the history of events leading up to the CAAP, we find that the CAAP was a strategic response to social and political pressures that had built up over the previous decade. Its intent was to respond to local concerns and reduce opposition to port growth. The CAAP represents an example of the potential of voluntary efforts to solve environmental problems. - Highlights: • We conduct a case study of self-regulation for emissions reduction at seaports in Southern California. • We examine motivations for implementing the Clean Air Action Plan. • We find that social and political pressures were the main motivators, with regulatory threats a contributing factor. • The Clean Air Action Plan is a powerful example of the potential of voluntary strategies

  4. Understanding determinants of government and consumer behavior relative to product safety : an application of the theory of planned behavior to China and the United States

    OpenAIRE

    Domke, Laura

    2008-01-01

    The following thesis applies Icek Ajzen's Theory of Planned Behavior to explain consumer and government response to safety of Chinese-made products sold in China and the United States. The thesis relies on secondary data as it considers the responses and actions relative to product safety by four different groups: Chinese government, U.S. government, Chinese consumers and U.S. consumers. Increased globalization has heightened the need for a better understanding and agreement...

  5. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick; Burmeister, Mark

    2014-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 square miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.

  6. Building Energy Benchmarking in India: an Action Plan for Advancing the State-of-the-Art

    Energy Technology Data Exchange (ETDEWEB)

    Sarraf, Saket [Centre for Environmental Planning and Technology (CEPT) Univ., Ahmedabad (India); Anand, Shilpi [Centre for Environmental Planning and Technology (CEPT) Univ., Ahmedabad (India); Shukla, Yash [Centre for Environmental Planning and Technology (CEPT) Univ., Ahmedabad (India); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Singh, Reshma [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-06-01

    This document describes an action plan for advancing the state of the art of commercial building energy benchmarking in the Indian context. The document is primarily intended for two audiences: (a) Research and development (R&D) sponsors and researchers can use the action plan to frame, plan, prioritize and scope new energy benchmarking R&D in order to ensure that their research is market relevant; (b) Policy makers and program implementers engaged in the deployment of benchmarking and building efficiency rating programmes can use the action plan for policy formulation and enforcement .

  7. The Radiation Safety Interlock System for Top-Up Mode Operation at NSRRC

    CERN Document Server

    Chen Chien Rong; Kao, Sheau-Ping; Liu, Joseph; Sheu, Rong-Jiun; Wang, Jau-Ping

    2005-01-01

    The radiation safety interlock systems of NSRRC have been operated for more than a decade. Some modification actions have been implemented in the past to perfect the safe operation. The machine and its interlock system were originally designed to operate at the decay mode. Recently some improvement programs to make the machine injection from original decay mode to top-up mode at NSRRC has initiated. For users at experimental area the radiation dose resulted from top-up re-fill injections where safety shutters of beam-lines are opened will dominate. In addition to radiation safety action plans such as upgrading the shielding, enlarging the exclusion zones and improving the injection efficiency, the interlock system for top-up operation is the most important to make sure that injection efficiency is acceptable. To ensure the personnel radiation safety during the top-up mode, the safety interlock upgrade and action plans will be implemented. This paper will summarize the original design logic of the safety inter...

  8. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    Energy Technology Data Exchange (ETDEWEB)

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work; therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.

  9. Improving the safety and protective automatic actions of the CMS electromagnetic calorimeter detector control system

    CERN Document Server

    Jimenez Estupinan, Raul; Cirkovic, Predrag; Di Calafiori, Diogo Raphael; Dissertori, Guenther; Djambazov, Lubomir; Jovanovic, Dragoslav; Lustermann, Werner; Milenovic, Predrag; Zelepoukine, Serguei

    2017-01-01

    The CMS ECAL Detector Control System (DCS) features several monitoring mechanisms able to react and perform automatic actions based on pre-defined action matrices. The DCS is capable of early detection of anomalies inside the ECAL and on its off-detector support systems, triggering automatic actions to mitigate the impact of these events and preventing them from escalating to the safety system. The treatment of such events by the DCS allows for a faster recovery process, better understanding of the development of issues, and in most cases, actions with higher granularity than the safety system. This paper presents the details of the DCS automatic action mechanisms, as well as their evolution based on several years of CMS ECAL operations.

  10. Kenya's Climate Change Action Plan. Low Carbon Climate Resilient Development Pathway

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, D.; Sawyer, D.; Stiebert, S.; McFatridge, S. [International Institute for Sustainable Development IISD, Winnipeg, Manitoba (Canada); Wuertenberger, L.; Van Tilburg, X.; Hekkenberg, M. [Energy research Centre of the Netherlands ECN, Policy Studies, Amsterdam (Netherlands); Owino, T.; Battye, W. [ClimateCare, Nairobi (Kenya); Mutia, T. [Regional Institute for Social Enterprise Kenya RISE, Nairobi (Kenya); Olum, P. [Climate Change Consultant (Kenya)

    2012-12-15

    Kenya Vision 2030 - the long-term development blueprint for the country - aims to transform Kenya into 'a newly industrialising, middle-income country providing a high quality of life to all its citizens in a clean and secure environment'. A low carbon climate resilient development pathway, as set out in this Climate Change Action Plan, can help meet Vision 2030 goals through actions that address both sustainable development and climate change. This pathway can also help the Government achieve the Millennium Development Goals and other internationally agreed development goals without compromising the environment and its natural resources. As Kenya realizes its development aspirations, there will be gains and risks. A growing population and economy with migration to cities will mean increases in greenhouse gas (GHG) emissions. Resulting environmental and social conditions, including increased competition over resources, could intensify vulnerability to climate risks. Transitioning to a low carbon climate resilient development pathway can address future risks thereby improving Kenya's ability to prosper under a changing climate while reducing the emissions intensity of a growing economy. Moving forward on the 2010 National Climate Change Response Strategy will help Kenya transition to a low carbon climate resilient development pathway that puts people and livelihoods at the forefront. The strategy recognized the importance of climate change and development, and this Climate Change Action Plan is the logical next step. A yearlong multistakeholder participatory process involving the public sector, private sector and civil society resulted in this Action Plan that identifies priority climate change actions for Kenya for the short, medium and long term. The Government of Kenya takes climate change and its impact on development seriously. Climate change is considered a crosscutting issue that will be mainstreamed in the planning process both at the national

  11. Study of industry safety management

    International Nuclear Information System (INIS)

    Park, Pil Su

    1987-06-01

    This book deals with general remarks, industrial accidents, statistics of industrial accidents, unsafe actions, making machinery and facilities safe, safe activities, having working environment safe, survey of industrial accidents and analysis of causes, system of safety management and operations, safety management planning, safety education, human engineering such as human-machines system, system safety, and costs of disaster losses. It lastly adds individual protective equipment and working clothes including protect equipment for eyes, face, hands, arms and feet.

  12. Who formulates self-regulatory action plans regarding fruit consumption? An application of the big five personality theory.

    NARCIS (Netherlands)

    de Bruijn, G.-J.

    2013-01-01

    Objective: Action planning is regarded as an important correlate and predictor of health behaviour, but little is known about antecedents of action planning. Because personality constructs have been shown to moderate the effect of action planning interventions, the present study tested associations

  13. Planning-in-Action: An Innovative Approach to Human Development. The Hunger Project.

    Science.gov (United States)

    Community Development Journal, 1991

    1991-01-01

    The Hunger Project in India used a strategic planning-in-action approach that involved (1) reaching a common understanding; (2) creating a strategic intent; (3) choosing social indicators; (4) identifying strategic objectives; (5) empowering leadership; (6) identifying immediate action steps; and (7) sustaining the action. (SK)

  14. Chemical hygiene plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan was written to administer and monitor safety measures and chemical hygiene principles in the TAC Uranium Mill Tailing Remedial Action Project sample preparation facility in Albuquerque, New Mexico. It applies to toxic and/or hazardous materials to radioactive materials

  15. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  16. Strategic Action Plan for ERNWACA - 2007-2011 | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Strategic Action Plan for ERNWACA - 2007-2011. IDRC institutional support over the period 2003-2006 (project 102095) enabled the Educational Research Network for West and Central Africa (ERNWACA) to carry out research that made an important contribution to policy dialogue in the region. The work also allowed the ...

  17. Development and verification for review plan of emergency action level (EAL)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Emergency action levels (EALs) are used as the trigger in order to implement the precautionary protective actions at the nuclear emergency. In this study the framework for applying the EAL in Japan and the process for developing the review plan, such as procedures to review the basis of EAL submitted by the licensee, have been investigated based on the survey for EAL review executed in the United States. In addition, issues to reflect the EAL framework in enhancement of the local government emergency planning and emergency response support system have been investigated. (author)

  18. Documentation of a Model Action Plan to Deter Illicit Nuclear Trafficking

    International Nuclear Information System (INIS)

    Smith, D; Kristo, M; Niemeyer, S; Dudder, G

    2006-01-01

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures

  19. Documentation of a model action plan to deter illicit nuclear trafficking

    International Nuclear Information System (INIS)

    Smith, D.K.; Kristo, M.J.; Niemeyer, S.; Dudder, G.B.

    2008-01-01

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures. (author)

  20. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1989-08-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site near Tuba City, Arizona. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the Navajo Nation, the Hopi Tribe, US Bureau of Indian Affairs (BIA), and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE, the Navajo Nation, and the Hopi Tribe, and concurrence by NRC, becomes Appendix B of the Cooperative Agreement. Following the introduction, contents are as follows: Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 summarizes the plan for ensuring environmental, health, and safety protection for the surrounding community and the on-site workers. Section 6.0 presents a detailed listing of the responsibilities of the project participants. Section 7.0 describes the features of the long-term surveillance and maintenance plan. Section 8.0 presents the quality assurance aspects of the project. Section 9.0 documents the ongoing activities to keep the public informed and participating in the project

  1. 77 FR 58488 - Hawaii State Plan for Occupational Safety and Health

    Science.gov (United States)

    2012-09-21

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1952 [Docket ID. OSHA 2012-0029] RIN 1218-AC78 Hawaii State Plan for Occupational Safety and Health AGENCY: Occupational... announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State...

  2. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  3. A report on developing a checklist to assess company plans focused on improving safety awareness, safe behaviour and safety culture: final report

    NARCIS (Netherlands)

    Steijger, N.; Starren, H.; Keus, M.; Gort, J.; Vervoort, M.

    2003-01-01

    This report describes the process of developing a checklist to asses company plans focused on improving safety awareness, safe behaviour and safety culture. These plans are part of a programme initiated by the Ministry of Social Affairs and Employment aiming at improving the safety performance of

  4. Self-management interventions including action plans for exacerbations versus usual care in patients with chronic obstructive pulmonary disease.

    Science.gov (United States)

    Lenferink, Anke; Brusse-Keizer, Marjolein; van der Valk, Paul Dlpm; Frith, Peter A; Zwerink, Marlies; Monninkhof, Evelyn M; van der Palen, Job; Effing, Tanja W

    2017-08-04

    and increase the ability to provide stronger recommendations regarding effective self-management interventions that include action plans for AECOPD. For safety reasons, COPD self-management action plans should take into account comorbidities when used in the wider population of people with COPD who have comorbidities. Although we were unable to evaluate this strategy in this review, it can be expected to further increase the safety of self-management interventions. We also advise to involve Data and Safety Monitoring Boards for future COPD self-management studies.

  5. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  6. Safety issue resolution strategy plan for inactive miscellaneous underground storage tanks

    International Nuclear Information System (INIS)

    Wang, O.S.; Powers, T.B.

    1994-09-01

    The purpose of this strategy plan is to identify, confirm, and resolve safely issues associated with inactive miscellaneous underground storage tanks (MUSTs) using a risk-based priority approach. Assumptions and processes to assess potential risks and operational concerns are documented in this report. Safety issue priorities are ranked based on a number of considerations including risk ranking and cost effectiveness. This plan specifies work scope and recommends schedules for activities related to resolving safety issues, such as collecting historical data, searching for authorization documents, performing Unreviewed Safety Question (USQ) screening and evaluation, identifying safety issues, imposing operational controls and monitoring, characterizing waste contents, mitigating and resolving safety issues, and fulfilling other remediation requirements consistent with the overall Tank Waste Remediation System strategy. Recommendations for characterization and remediation are also recommended according to the order of importance and practical programmatic consideration

  7. IAEA supports regional seas conventions and action plans

    International Nuclear Information System (INIS)

    2000-01-01

    The document informs about the 3rd Global Meeting of Regional Seas Conventions and Action Plans held in Monaco in November 2000 at the IAEA's Marine Environmental Laboratory (IAEA-MEL). The meeting assembled a number of marine environmental experts from several UN bodies to reinforce activities to protect the marine environment

  8. Evaluation and analysis of emergency maintenance due by third party action's, formulation and execution of contingency plans

    Energy Technology Data Exchange (ETDEWEB)

    Torres Vega, Raul; Nunez Ribera, Gary [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2009-07-01

    In September 2008, in the Yacuiba - Rio Grande Gas Pipeline (GASYRG) located in the south of Bolivia, atypical situations took place. Due to the political events and the social mobilizations in which the country was, a series of third party actions developed putting in risk the facilities of the gas pipeline. These actions resulted in the rupture of a 1 inch instrumentation pipe, causing a leak witch some time caught fire and caused an interruption of the transportation service in that section of the pipeline, later on, another action derived in safety valve shut down causing a total pipeline shut down. In addition to these events we experience a fuel shortage, road blocks and a telephone communication system failure. In spite of these obstacles the maintenance activities were realized and emergency repairs put back in operating conditions the gas pipeline, task that was accomplished in a very short time, taking in account the situation. Later analysis, including all the adverse elements of the situation, result in the adoption of a series of measures and plans directed to mitigate the risk associated to this type of events, such as Mutual Aid Plans with fellow companies and institutions, fortification of the patrimonial security, stock material handling for emergency repairs, etc. (author)

  9. Planning report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    2003-06-01

    This document is a planning report for SKB's next assessment of long-term safety for a KBS 3 repository. The assessment, SR-Can, is to be finished by the end of 2005 and will be used for SKB's application to build an Encapsulation plant for spent nuclear fuel. Apart from outlining the methodology, the report discusses the handling in SR-Can of a number of important issues regarding the near field, the geosphere, the biosphere, the climatic evolution etc. The Swedish nuclear safety and radiation protection authorities have recently issued regulations concerning the final disposal of nuclear waste. The principal compliance criterion states that the annual risk of harmful effects must not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. There are also a number of requirements on methodological aspects of the safety assessment as well as on the contents of a safety report. The regulations are reproduced in an Appendix to this report. The primary safety function of the KBS 3 system is to completely isolate the spent nuclear fuel within copper canisters over the entire assessment period, which will be one million years in SR-Can. Should a canister be damaged, the secondary safety function is to retard any releases from the canisters. The main steps of the assessment are the following: 1. Qualitative system description, FEP processing: This step consists of defining a system boundary and of describing the system on a format suitable for the safety assessment. Databases of relevant features, events and processes influencing long-term safety are structured and used as one starting point for the assessment. 2. Initial state descriptions. 3. Process descriptions: In this step all identified processes within the system boundary involved in the long-term evolution of the system are described in detail. 4. Description of boundary conditions: This step is a broad description of the evolution of the boundaries of the system, focussing mainly

  10. School Safety, Severe Disciplinary Actions, and School Characteristics: A Secondary Analysis of the School Survey on Crime and Safety

    Science.gov (United States)

    Han, Seunghee; Akiba, Motoko

    2011-01-01

    On the basis of a secondary analysis of survey data collected from 1,872 secondary school principals in the 2005-2006 School Survey on Crime and Safety, we examined the frequency of and reasons for severe disciplinary actions and the relationship between school characteristics and severe disciplinary actions. We found that severe disciplinary…

  11. Visual information for action planning in left and right congenital hemiparesis

    NARCIS (Netherlands)

    Craje, C.; van der Kamp, J.; Steenbergen, B.

    2009-01-01

    Converging evidence suggests that compromised motor abilities in hemiparetic cerebral palsy are not solely due to impairments in motor execution, but are also related to deficits in action planning. The present study had two aims. First, we compared grip planning in a sequential task between

  12. ENHANCED PROACTIVE PLANNING APPROACH: A CRUCIAL TO AN IMPROVED WORKERS’ SAFETY IN WESTERN NIGERIA SMALL SCALE INDUSTRY

    Directory of Open Access Journals (Sweden)

    H.O. ADEYEMI

    2016-12-01

    Full Text Available This study evaluated managements’ proactive planning approach (PPA to enhance safety among workers in South-western Nigeria small scale industry (SSI. The main objective was to rate the managements’ efforts at eliminating risk among their employees. By worker participatory and psychological survey approach, three tools were used; workplace observation (visual, management safety culture (questionnaire and managers interviews (oral. The survey included 200 workers, 120 supervisors and 80 managers, in 82 SSI. Four steps to a safety proactive action plans (PAP, (looking for clues, prioritization of identified potential hazard, making improvements to eliminate the risk and follow up, were rated by employees on a scale from 0 to 5. Paired t-test was used to appraise the significant difference between the managers’ mean scores rated by the supervisors and other workers. 77.1% of workers and 64.2% supervisors rated their managers as either “not done at all” or “poorly done”. Workers’ scores for managers PPA had statistically significantly lower ratings (mean=1.09, SEM = 0.22 compared to that of the supervisors rating (mean= 1.55, SEM = 0.32, with t (14 = -1.185, p = 0.784. There is a closed poor performance perception gaps, of managers’ PPA, of the two groups of employees. It can be concluded that safety is not emphasized, by managers of SSI, as overriding priority and this may have contributed to high reported injuries among their workforce. Courses to enhance managements’ understanding for inclusion of safety among the leading priorities becomes necessary. This will reduce work-related risks and promotes occupational safety and health among the group of workers.

  13. Action Plan for the Development of Civic Morality

    Science.gov (United States)

    Chinese Education and Society, 2006

    2006-01-01

    This paper discusses the action plan for the development of civic morality. Here, the importance, substance, ideology and policy principles guiding the development of civic morality is elaborated. In order to strengthen the development of civic morality, it is a must to adapt to the requirements of the developing situation; seize good…

  14. Factors associated with ownership and use of written asthma action plans in North-West Melbourne.

    Science.gov (United States)

    Sulaiman, N D; Barton, C A; Abramson, M J; Liaw, T; Harris, C; Chondros, P; Dharmage, S; Clarke, D

    2004-12-01

    Written asthma action plans (WAAPs) have become a core component of asthma management in Australia. We investigated ownership, utilisation and factors associated with ownership of asthma action plans by caregivers. 443/776 (57%) caregivers of children aged 2-14 years with asthma were identified from 32 GP clinics as part of a randomised controlled trial (RCT), and completed self-administered questionnaires. Only 29% of participants owned a WAAP, while 13% possessed verbal instructions, and 56% had no plan. An asthma action plan for children, which was developed by a general practitioner (GP) was more likely to comprise verbal instructions (p = 0.001), while action plans developed by paediatricians were more likely to be written (p time they visited their doctor for asthma. Factors associated with WAAP ownership included nights waking (p = 0.013), self reported severity (p = 0.001), and days lost from school (p = 0.037). Children who had seen a GP in the last 3 months for asthma, or who had been to the Emergency Department (ED) or hospital were more likely to possess a WAAP (p < 0.001). Caregivers who were less satisfied with their child's asthma control were more likely to own a WAAP (p = 0.037). Caregivers with any action plan found it useful and 82% reported using their action plan for management of an acute attack. However, caregivers with a WAAP were more likely to adhere to the plan for an acute attack compared to caregivers with verbal instructions (OR = 4.5, p < 0.05). Caregivers with a WAAP were more knowledgeable about asthma (p = 0.002), better able to recognise the difference between preventer and reliever medications (p = 0.01), and better able to recognise an asthma attack (p = 0.006). Ownership of WAAPs in this group was still too low. Importantly, caregivers with written instructions were more knowledgeable about asthma and more likely to report following the action plan during an asthma attack.

  15. Nuclear Safety Review for 2014

    International Nuclear Information System (INIS)

    2014-07-01

    The Nuclear Safety Review 2014 focuses on the dominant nuclear safety trends, issues and challenges in 2013. The Executive Overview provides general nuclear safety information along with a summary of the major issues covered in this report: strengthening safety in nuclear installations; improving radiation, transport and waste safety; enhancing emergency preparedness and response (EPR); improving regulatory infrastructure and effectiveness; and strengthening civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards, and activities relevant to the Agency’s safety standards. The global nuclear community has made steady and continuous progress in strengthening nuclear safety in 2013, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as “the Action Plan”) and reported in Progress in the Implementation of the IAEA Action Plan on Nuclear Safety (document GOV/INF/2013/8-GC(57)/INF/5), and the Supplementary Information to that report and Progress in the Implementation of the IAEA Action Plan on Nuclear Safety (document GOV/INF/2014/2). • Significant progress continues to be made in several key areas, such as assessments of safety vulnerabilities of nuclear power plants (NPPs), strengthening of the Agency’s peer review services, improvements in EPR capabilities, strengthening and maintaining capacity building, and protecting people and the environment from ionizing radiation. The progress that has been made in these and other areas has contributed to the enhancement of the global nuclear safety framework. • Significant progress has also been made in reviewing the Agency’s safety standards, which continue to be widely applied by regulators, operators and the nuclear industry in general, with increased attention and focus on vitally important areas such as design and operation of NPPs, protection of NPPs against severe accidents, and EPR. • The Agency continued to

  16. Nuclear Safety Review 2013

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-07-15

    The Nuclear Safety Review 2013 focuses on the dominant nuclear safety trends, issues and challenges in 2012. The Executive Overview provides crosscutting and worldwide nuclear safety information along with a summary of the major sections covered in this report. Sections A-E of this report cover improving radiation, transport and waste safety; strengthening safety in nuclear installations; improving regulatory infrastructure and effectiveness; enhancing emergency preparedness and response (EPR); and civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards (CSS), and activities relevant to the IAEA Safety Standards. The world nuclear community has made noteworthy progress in strengthening nuclear safety in 2012, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as ''the Action Plan''). For example, an overwhelming majority of Member States with operating nuclear power plants (NPPs) have undertaken and essentially completed comprehensive safety reassessments ('stress tests') with the aim of evaluating the design and safety aspects of plant robustness to protect against extreme events, including: defence in depth, safety margins, cliff edge effects, multiple failures, and the prolonged loss of support systems. As a result, many have introduced additional safety measures including mitigation of station blackout. Moreover, the IAEA's peer review services and safety standards have been reviewed and strengthened where needed. Capacity building programmes have been built or improved, and EPR programmes have also been reviewed and improved. Furthermore, in 2012, the IAEA continued to share lessons learned from the Fukushima Daiichi accident with the nuclear community including through three international experts' meetings (IEMs) on reactor and spent fuel safety, communication in the event of a nuclear or radiological emergency, and protection against extreme earthquakes and tsunamis.

  17. Nuclear Safety Review 2013

    International Nuclear Information System (INIS)

    2013-07-01

    The Nuclear Safety Review 2013 focuses on the dominant nuclear safety trends, issues and challenges in 2012. The Executive Overview provides crosscutting and worldwide nuclear safety information along with a summary of the major sections covered in this report. Sections A-E of this report cover improving radiation, transport and waste safety; strengthening safety in nuclear installations; improving regulatory infrastructure and effectiveness; enhancing emergency preparedness and response (EPR); and civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards (CSS), and activities relevant to the IAEA Safety Standards. The world nuclear community has made noteworthy progress in strengthening nuclear safety in 2012, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as ''the Action Plan''). For example, an overwhelming majority of Member States with operating nuclear power plants (NPPs) have undertaken and essentially completed comprehensive safety reassessments ('stress tests') with the aim of evaluating the design and safety aspects of plant robustness to protect against extreme events, including: defence in depth, safety margins, cliff edge effects, multiple failures, and the prolonged loss of support systems. As a result, many have introduced additional safety measures including mitigation of station blackout. Moreover, the IAEA's peer review services and safety standards have been reviewed and strengthened where needed. Capacity building programmes have been built or improved, and EPR programmes have also been reviewed and improved. Furthermore, in 2012, the IAEA continued to share lessons learned from the Fukushima Daiichi accident with the nuclear community including through three international experts' meetings (IEMs) on reactor and spent fuel safety, communication in the event of a nuclear or radiological emergency, and protection against extreme earthquakes and tsunamis

  18. Plan for safety case of spent fuel repository at Olkiluoto

    International Nuclear Information System (INIS)

    Vieno, T.; Ikonen, A.T.K.

    2005-02-01

    Posiva aims to present the Safety Case supporting the construction license application of the spent fuel repository at Olkiluoto by 2012. An outline and preliminary assessments will be presented in 2009. Interim reporting and an update of the Safety Case plan will be presented in 2006, as required by the authorities. The KBS-3 disposal concept aims at long-term isolation and containment of spent fuel assemblies in durable copper-iron canisters emplaced in a repository to be constructed at a depth between 400 and 600 metres in crystalline bedrock. By 2012, studies on the KBS-3 disposal concept and site investigations at Olkiluoto will have been continued over about thirty years. The construction of an underground rock characterisation facility (called ONKALO) was started in June 2004. The investigations are carried out in close cooperation with the Swedish SKB developing and assessing the same disposal concept at candidate sites, resembling Olkiluoto, at the other side of the Baltic Sea. A safety case is the synthesis of evidence, analyses and arguments that quantify and substantiate the safety, and the level of expert confidence in the safety, of a planned repository. Posiva's Safety Case will be organised in a portfolio including ten main reports, which will be periodically updated according the overall schedule presented in the plan. The Site report describing the present state and past evolution of the Olkiluoto site, as well as the disturbances caused by the construction of ONKALO and the first stage of the repository, forms the geoscientific basis of the Safety Case. The engineering basis is provided by the reports on the Characteristics of spent fuel, Canister design, and Repository design. The Process report containing descriptions and analyses of features, events and processes potentially affecting the disposal system, and the report on the Evolution of site and repository form the scientific basis of the Safety Case. The latter report will describe and

  19. US Nuclear Regulatory Commission human-factors program plan

    International Nuclear Information System (INIS)

    1983-08-01

    The purpose of the NRC Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This initial plan addresses nuclear power plants (NPP) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements, and (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-83 through FY-85 time frame

  20. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems

  1. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  2. Safety Awareness & Communications Internship

    Science.gov (United States)

    Jefferson, Zanani

    2015-01-01

    The projects that I have worked on during my internships were updating the JSC Safety & Health Action Team JSAT Employee Guidebook, conducting a JSC mishap case study, preparing for JSC Today Close Call success stories, and assisting with event planning and awareness.

  3. Implementation of local climate action plans

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2017-01-01

    The purpose of this article is to improve understanding of local climate action plans and their implementation and evaluation. It explores how goal definition and the choice of assessment metrics frame goal attainment and influence implementation behaviour. Using the Danish capital of Copenhagen...... a high overall implementation performance, both in terms of changes in energy supply and emission reductions, these metrics are only partially linked. It also shows that inconsistencies between the system scope of the base year emissions and goal attainment, due to the use of offsetting, may lead...

  4. Learning through Participatory Action Research for Community Ecotourism Planning.

    Science.gov (United States)

    Guevara, Jose Roberto Q.

    1996-01-01

    Ecologically sound tourism planning and policy require an empowering community participation. The participatory action research model helps a community gain understanding of its social reality, learn how to learn, initiate dialog, and discover new possibilities for addressing its situation. (SK)

  5. School Climate: An Essential Component of a Comprehensive School Safety Plan

    Science.gov (United States)

    Stark, Heidi

    2017-01-01

    The intentional assessment and management of school climate is an essential component of a comprehensive school safety plan. The value of this preventive aspect of school safety is often diminished as schools invest resources in physical security measures as a narrowly focused effort to increase school safety (Addington, 2009). This dissertation…

  6. The U.S. National Action Plan to Improve Health Literacy: A Model for Positive Organizational Change.

    Science.gov (United States)

    Baur, Cynthia; Harris, Linda; Squire, Elizabeth

    2017-01-01

    This chapter presents the U.S. National Action Plan to Improve Health Literacy and its unique contribution to public health and health care in the U.S. The chapter details what the National Action Plan is, how it evolved, and how it has influenced priorities for health literacy improvement work. Examples of how the National Action Plan fills policy and research gaps in health care and public health are included. The first part of the chapter lays the foundation for the development of the National Action Plan, and the second part discusses how it can stimulate positive organizational change to help create health literate organizations and move the nation towards a health literate society.

  7. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 970.5223-1 Section 970.5223-1 Federal Acquisition... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  8. Safety of nifedipine GITS in stable angina: The ACTION trial

    NARCIS (Netherlands)

    P. Poole-Wilson (Philip); B.A. Kirwan (Bridget Anne); Z. Vokó (Zoltán); S. de Brouwer (Sophie); F.J. van Dalen (Frederik); J. Lubsen (Jacob)

    2006-01-01

    textabstractAim: We describe the safety profile of nifedipine GITS as assessed from adverse events reported in the ACTION trial in which 7,665 patients with stable, symptomatic coronary artery disease were randomly assigned nifedipine GITS or placebo and followed for a mean of 4.9 years. Methods:

  9. UMTRA Project: Environment, Safety, and Health Plan

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project's ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors' evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations

  10. Clean slate corrective action investigation plan

    International Nuclear Information System (INIS)

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT)

  11. Clean slate corrective action investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

  12. Setting priorities for action plans at Los Alamos National Laboratory. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Miller, A.C.

    1992-09-30

    This report summarizes work done by Applied Decision Analysis (ADA) for Los Alamos National Laboratory (LANL) under Subcontract Number 9-XQ2-Y3837-1 with the University of California. The purpose of this work was to develop a method of setting priorities for environmental, safety, and health (ES&H) deficiencies at Los Alamos. The deficiencies were identified by a DOE Tiger Team that visited LANL in the fall of 1991, and by self assessments done by the Laboratory. ADA did the work described here between October 1991 and the end of September 1992. The ADA staff working on this project became part of a Risk Management Team in the Laboratory`s Integration and Coordination Office (ICO). During the project, the Risk Management Team produced a variety of documents describing aspects of the action-plan prioritization system. Some of those documents are attached to this report. Rather than attempt to duplicate their contents, this report provides a guide to those documents, and references them whenever appropriate.

  13. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  14. Regulatory actions post - Fukushima

    International Nuclear Information System (INIS)

    Ciurea Ercau, C.

    2013-01-01

    The paper presents the results of the safety reviews performed in Romania after the Fukushima accident and the resulting actions for improving the safety. The actions taken by the National Commission for Nuclear Activities Control (CNCAN) to improve the regulatory framework include the development of new regulations and the enhancement of inspection practices, taking account of the lessons learned from the Fukushima accident. A regulation on the response to transients, accidents and emergency situations at nuclear power plants has been developed, which includes requirements on transient and accident scenarios that have to be covered by the Emergency Operating Procedures (EOPs), accident scenarios to be covered by the Severe Accident Management Guidelines (SAMGs), emergency situations to be covered by the on-site emergency response plan and emergency response procedures. (authors)

  15. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-08-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

  16. Decisions on the safety of using nuclear power

    International Nuclear Information System (INIS)

    Janka, P.

    1992-01-01

    A new nuclear energy law came into force in Finland in 1988. This law defines general principles, conditions and requirements concerning the use of nuclear power. The law expects the use of nuclear power to be safe and the safety and contingency systems to be sufficient. General rules for the safety of using nuclear power and for safety arrangements and contingency plans are laid down by the government. The Finnish Centre for Radiation and Nuclear Safety has proposed the various rules to be adopted by the government and come into force by 1991. The rules for the safety of nuclear power plants and final waste storage plants contain limits for emissions of radioactive substances and radiation exposure and requirements for the safety in planning, building and using nuclear power plants and final waste storage plants. They observe international experience and research on risks linked to the use of nuclear power from the last few years as well as means and measures to contain these risks under all conditions. Safety arrangements at nuclear power plants contain measures required to be taken by the owner of the plants to thwart unlawful activities aimed at the plant. Most important of these are the rules for actions to be taken in dangerous situations. The proposed contingency plans contain measures to be taken by the owner of the plants in order to contain nuclear damages resulting from an accident. Most important of these are the rules for planning contingency arrangements, keeping these arrangements operable and actions to be taken in emergency situations. (author)

  17. The evolving role and care management approaches of safety-net medicaid managed care plans

    OpenAIRE

    Gusmano, Michael K.; Sparer, Michael S.; Brown, Lawrence D.; Rowe, Catherine; Gray, Bradford

    2002-01-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods we studied these “safety-net” health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also f...

  18. The Nordic programme for nuclear safety 1990-1993

    International Nuclear Information System (INIS)

    1992-02-01

    The description of planned projects concerning nuclear safety is divided under the headings of readiness for action in situations of abnormal radiation, nuclear wastes and deposition, radioecology, and reactor safety - professional emergency-readiness. Coordination initiatives are also dealt with. In addition to this a survey of projects, coordinators and project leaders and a description of suggested new measures for nuclear safety are given. Under the first heading the subjects dealt with are spreading and local consequences, strategies, measuring methods and data exchange and management for decision-makers, evaluation, harmonization and effecting of plans, public information, a nordic emergency action exercise and reduction data connected with contaminated areas. The second heading covers criteria for classification of radioactive material, experiences in demolition of uranium-cleaning plants, information management, waste management in the case of field deposition with radioactivity from past reactor accidents and climatological and geological processes of significance for long-duration safety. Subjects under the third heading of radioecology cover training, quality assurance, aquatic radioecology, agricultural and natural ecosystems. Subjects under reactor safety include safety evaluation, the course of serious accidents, and data on neighbour-reactor system's conditions of safety. (AB)

  19. Action planning as predictor of health protective and health risk behavior: an investigation of fruit and snack consumption.

    Science.gov (United States)

    van Osch, Liesbeth; Beenackers, Mariëlle; Reubsaet, Astrid; Lechner, Lilian; Candel, Math; de Vries, Hein

    2009-10-13

    Large discrepancies between people's intention to eat a healthy diet and actual dietary behavior indicate that motivation is not a sufficient instigator for healthy behavior. Research efforts to decrease this 'intention - behavior gap' have centered on aspects of self-regulation, most importantly self-regulatory planning. Most studies on the impact of self-regulatory planning in health and dietary behavior focus on the promotion of health protective behaviors. This study investigates and compares the predictive value of action planning in health protective behavior and the restriction of health risk behavior. Two longitudinal observational studies were performed simultaneously, one focusing on fruit consumption (N = 572) and one on high-caloric snack consumption (N = 585) in Dutch adults. Structural equation modeling was used to investigate and compare the predictive value of action planning in both behaviors, correcting for demographics and the influence of motivational factors and past behavior. The nature of the influence of action planning was investigated by testing mediating and moderating effects. Action planning was a significant predictor of fruit consumption and restricted snack consumption beyond the influence of motivational factors and past behavior. The strength of the predictive value of action planning did not differ between the two behaviors. Evidence for mediation of the intention - behavior relationship was found for both behaviors. Positive moderating effects of action planning were demonstrated for fruit consumption, indicating that individuals who report high levels of action planning are significantly more likely to translate their intentions into actual behavior. The results indicate that the planning of specific preparatory actions predicts the performance of healthy dietary behavior and support the application of self-regulatory planning in both health protective and health risk behaviors. Future interventions in dietary modification may

  20. Playing Multi-Action Adversarial Games: Online Evolutionary Planning versus Tree Search

    OpenAIRE

    Justesen, Niels; Mahlmann, Tobias; Risi, Sebastian; Togelius, Julian

    2017-01-01

    We address the problem of playing turn-based multi-action adversarial games, which include many strategy games with extremely high branching factors as players take multiple actions each turn. This leads to the breakdown of standard tree search methods, including Monte Carlo Tree Search (MCTS), as they become unable to reach a sufficient depth in the game tree. In this paper, we introduce Online Evolutionary Planning (OEP) to address this challenge, which searches for combinations of actions ...

  1. Review of the DOE Packaging and Transportation Safety Program

    International Nuclear Information System (INIS)

    Snyder, B.J.; Cece, J.M.

    1992-12-01

    This report documents the results of a year-long self-assessment of DOE-EH transportation and packaging safety activities. The self-assessment was initiated in September 1991 and concluded in August 1992. The self-assessment identified several significant issues, some of which have been resolved by EH. Also, improvements in the EH program were made during the course of the self-assessment. The report reflects the status of the EH transportation and packaging safety activities at the conclusion of the self-assessment. This report consists of several sections which discuss background, objectives and description of the review. Another section includes summary discussion and key conclusions. Appendix A, Issues, Observations and Recommendations, lists fifteen issues, including appropriate observations and recommendations. A Corrective Action Plan, which documents EH managements resolve to implement the agreed-upon recommendations, is included. The Corrective Action Plan reflects the status of completed and planned actions as of the date of the report

  2. Safety research basic plan of JNC

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Japan Nuclear Cycle Development Institute (JNC) formally succeeded to Power Reactor and Nuclear Fuel Development Corporation (PNC) on October, 1 1998. This report describes the basic plan for major program of JNC which consists of two parts: management philosophy of the new institute and the latest revised medium term program. In the first part, the primary mission of JNC is to perform its R and D concentrating on fast breeder reactor and its fuel cycle, and treatment and disposal of high-level radioactive wastes, while at the same time giving special consideration to safety. In the second, individual programs in the new basic plan are discussed in detail. The outline and schedule of each program are also attached in the table form. (H. Itami)

  3. Corrective Action Investigation Plan for Corrective Action Unit 542: Disposal Holes, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Laura Pastor

    2006-01-01

    locate previously unidentified features at CASs 03-20-07, 03-20-09, 03-20-10, 03-20-11, and 06-20-03. (4) Perform field screening. (5) Collect and submit environmental samples for laboratory analysis to determine whether contaminants of concern (COCs) are present. (6) Collect quality control samples for laboratory analyses to evaluate the performance of measurement systems and controls based on the requirements of the data quality indicators. (7) If COCs are present at the surface/near surface (< 15 feet below ground surface), collect additional step-out samples to define the extent of the contamination. (8) If COCs are present in the subsurface (i.e., base of disposal hole), collect additional samples to define the vertical extent of contamination. A conservative use restriction will be used to encompass the lateral extent of subsurface contamination. (9) Stake or flag sample locations in the field, and record coordinates through global positioning systems surveying. (10) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This Corrective Action Investigation Plan has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan

  4. Remedial action and waste disposal project: 100-DR-1 remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Calverley, C.

    1996-08-01

    This plan presents the method used to assess the readiness of the 100- DR-1 Remedial Action Project. Remediation of the 100-D sites (located on the Hanford Site) involves the excavation (treatment if applicable) and final disposal of contaminated soil and debris associated with the high-priority waste sites in the 100 Areas

  5. Measuring the quality of Patients’ goals and action plans: development and validation of a novel tool

    Directory of Open Access Journals (Sweden)

    Teal Cayla R

    2012-12-01

    Full Text Available Abstract Background The purpose of this study is to develop and test reliability, validity, and utility of the Goal-Setting Evaluation Tool for Diabetes (GET-D. The effectiveness of diabetes self-management is predicated on goal-setting and action planning strategies. Evaluation of self-management interventions is hampered by the absence of tools to assess quality of goals and action plans. To address this gap, we developed the GET-D, a criteria-based, observer rating scale that measures the quality of patients’ diabetes goals and action plans. Methods We conducted 3-stage development of GET-D, including identification of criteria for observer ratings of goals and action plans, rater training and pilot testing; and then performed psychometric testing of the GET-D. Results Trained raters could effectively rate the quality of patient-generated goals and action plans using the GET-D. Ratings performed by trained evaluators demonstrated good raw agreement (94.4% and inter-rater reliability (Kappa = 0.66. Scores on the GET-D correlated well with measures theoretically associated with goal-setting, including patient activation (r=.252, P Conclusions The GET-D can reliably and validly rate the quality of goals and action plans. It holds promise as a measure of intervention fidelity for clinical interventions that promote diabetes self-management behaviors to improve clinical outcomes. Trial registration Clinicaltrials.gov Identifier: NCT00481286

  6. The Action Plan Against Repetitive Work - An Industrial Relation Strategy for Improving the Working Environment

    DEFF Research Database (Denmark)

    Hasle, Peter; Møller, Niels

    2001-01-01

    The Danish Action Plan against Repetitive Work is presented and discussed as a possible new strategy for regulating repetitive work as well as other complicated working environment problems. The article is based on an empirical evaluation ot the Action Plan. The asseessment of the Action Plan...... indicates that a measurable reduction of repetitive work has been achieved, while recognizing the the new management strategies focusing on human resources development have also played an important role. These results are used to suggest that - under certain conditions - a combination of state regulation...... and industrial relation agreements can be used to regulate other working environment problems....

  7. Therapeutic risk management of the suicidal patient: safety planning.

    Science.gov (United States)

    Matarazzo, Bridget B; Homaifar, Beeta Y; Wortzel, Hal S

    2014-05-01

    This column is the fourth in a series describing a model for therapeutic risk management of the suicidal patient. Previous columns presented an overview of the therapeutic risk management model, provided recommendations for how to augment risk assessment using structured assessments, and discussed the importance of risk stratification in terms of both severity and temporality. This final column in the series discusses the safety planning intervention as a critical component of therapeutic risk management of suicide risk. We first present concerns related to the relatively common practice of using no-suicide contracts to manage risk. We then present the safety planning intervention as an alternative approach and provide recommendations for how to use this innovative strategy to therapeutically mitigate risk in the suicidal patient.

  8. Action Plan on Base Erosion and Profit Shifting: An Indian Perspective.

    OpenAIRE

    Rao, R. Kavita; Sengupta, D.P.

    2014-01-01

    The discussion in this paper highlights some evidence to support the notion that there is base erosion in India. On the specific action points listed in the OECD's Action Plan, a perspective from India's stand point has been presented along with a brief discussion on the steps needed to prepare for complying with likely proposed measures.

  9. Sodium Fast Reactor Safety and Licensing Research Plan

    International Nuclear Information System (INIS)

    Denman, Matthew; Lachance, Jeff; Sofu, Tanju; Wigeland, Roald; Flanagan, George; Bari, Robert

    2013-01-01

    Conclusions: The Sodium Fast Reactor Safety and Licensing Research Plan reports conclude a multi-year expert elicitation process. All information included in the studies are publicly available and the reports are UUR. These reports are intended to guide SFR researchers in the safety and licensing arena to important and outstanding issues Two (and a half) projects have been funded based on the recommendations in this report: • Modernization of SAS4A; • Incorporation of Contain/LMR with MELCOR; • (Data recovery at INL and PNNL)

  10. Student-Faculty Interactions about Disappointing Grades: Application of the Goals-Plans-Actions Model and the Theory of Planned Behavior

    Science.gov (United States)

    Henningsen, Mary Lynn Miller; Valde, Kathleen S.; Russell, Gregory A.; Russell, Gregory R.

    2011-01-01

    The goals-plans-actions model and the theory of planned behavior were used to predict what lead to students having a conversation about a disappointing grade with a faculty member. Participants (N = 130) completed two surveys. In the first survey, participants completed measures of primary and secondary goals, planning, decision to engage,…

  11. Some views on nuclear reactor safety

    Energy Technology Data Exchange (ETDEWEB)

    Tanguy, P.Y. [Electricite de France, Paris (France)

    1995-04-01

    This document is the text of a speech given by Pierre Y. Tanguy (Electricite de France) at the 22nd Water Reactor Safety Meeting held in Bethesda, MD in 1994. He describes the EDF nuclear program in broad terms and proceeds to discuss operational safety results with EDF plants. The speaker also outlines actions to enhance safety planned for the future, and he briefly mentions French cooperation with the Chinese on the Daya Bay project.

  12. Emergency team and action plan; Brigada de emergencia y plan de accion de emergencia

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez Gorgerino, Ruben Dario [Central Hidroelectrica Itaipu, Hernandarias (Paraguay)]. E-mail: jimenez@itaipu.gov.br

    1998-07-01

    This work reports the various activities developed by a commission designated for the investigation of the fire occurred in the excitation panel of the generator unit 16, for the execution of two tasks: short term creation of plant emergency team, and a long term implementation of emergency action plan.

  13. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water

  14. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  15. Remedial Action Plan for the codisposal and stabilization of the Monument Valley and Mexican Hat uranium mill tailings at Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1993-02-01

    This document is a revision of the original Mexiacan Hat Remedial Action Plan (RAP) and RAP Modification submitted in July 1988 and January 1989, respectively, along with updated design documents. This RAP has been developed to serve a two-fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3. 0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 presents the water resources protection strategy. Section 6.0 summarizes the plan for ensuring health and safety protection for the surrounding community and the on- site workers. Section 7.0 lists the responsibilities of the project participants. Section 8.0 describes the features of the long-term surveillance and maintenance plan

  16. Handling of future human actions in the safety assessment SR-Site

    International Nuclear Information System (INIS)

    2010-12-01

    This report documents the future human actions, FHA, considered in the long-term safety analysis of a KBS-3 repository. The report is one of the supporting documents to the safety assessment SR-Site (see further the Main report /SKB 2011/). The purpose of this report is to provide an account of general considerations concerning FHA, the methodology applied in SR-Site to assess FHA, the aspects of FHA needed to be considered in the evaluation of their impact on a deep geological repository and to select and analyse representative scenarios for illustrative consequence analysis. The main focus of this report is a time period when institutional control has ceased to be effective, thereby permitting inadvertent intrusion. However, a brief discussion of the earlier period when the repository has been closed, sealed and continuously kept under institutional control is also provided. General The potential exposure to large quantities of radiotoxic material is an inescapable consequence of the deposition of spent nuclear fuel in a final repository, and consequently intrusion into the repository needs to be considered in repository design and safety assessment. In accordance with ICRP recommendations /ICRP 2000/, intrusion in the post-closure phase of institutional control and beyond is primarily prevented through the design of the repository. In addition to that there will presumably continue to be safeguards measures, preservation of information (record keeping) and possibly some sort of markers placed at the site. During the institutional control period, activities at the site have to be restricted or directed if they have the potential to interfere with or hinder surveillance of the site, but this does not necessarily rule out all forms of access to the area. Also the fact that the repository contains fissile materials is an important aspect. Control of safeguards measures will most likely be upheld by national as well as international agencies. Furthermore, the

  17. Handling of future human actions in the safety assessment SR-Site

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    This report documents the future human actions, FHA, considered in the long-term safety analysis of a KBS-3 repository. The report is one of the supporting documents to the safety assessment SR-Site (see further the Main report /SKB 2011/). The purpose of this report is to provide an account of general considerations concerning FHA, the methodology applied in SR-Site to assess FHA, the aspects of FHA needed to be considered in the evaluation of their impact on a deep geological repository and to select and analyse representative scenarios for illustrative consequence analysis. The main focus of this report is a time period when institutional control has ceased to be effective, thereby permitting inadvertent intrusion. However, a brief discussion of the earlier period when the repository has been closed, sealed and continuously kept under institutional control is also provided. General The potential exposure to large quantities of radiotoxic material is an inescapable consequence of the deposition of spent nuclear fuel in a final repository, and consequently intrusion into the repository needs to be considered in repository design and safety assessment. In accordance with ICRP recommendations /ICRP 2000/, intrusion in the post-closure phase of institutional control and beyond is primarily prevented through the design of the repository. In addition to that there will presumably continue to be safeguards measures, preservation of information (record keeping) and possibly some sort of markers placed at the site. During the institutional control period, activities at the site have to be restricted or directed if they have the potential to interfere with or hinder surveillance of the site, but this does not necessarily rule out all forms of access to the area. Also the fact that the repository contains fissile materials is an important aspect. Control of safeguards measures will most likely be upheld by national as well as international agencies. Furthermore, the

  18. Simulating my own or others action plans?--Motor representations, not visual representations are recalled in motor memory.

    Directory of Open Access Journals (Sweden)

    Christian Seegelke

    Full Text Available Action plans are not generated from scratch for each movement, but features of recently generated plans are recalled for subsequent movements. This study investigated whether the observation of an action is sufficient to trigger plan recall processes. Participant dyads performed an object manipulation task in which one participant transported a plunger from an outer platform to a center platform of different heights (first move. Subsequently, either the same (intra-individual task condition or the other participant (inter-individual task condition returned the plunger to the outer platform (return moves. Grasp heights were inversely related to center target height and similar irrespective of direction (first vs. return move and task condition (intra- vs. inter-individual. Moreover, participants' return move grasp heights were highly correlated with their own, but not with their partners' first move grasp heights. Our findings provide evidence that a simulated action plan resembles a plan of how the observer would execute that action (based on a motor representation rather than a plan of the actually observed action (based on a visual representation.

  19. Aspects you should consider in your action plan when implementing an improvement strategy

    DEFF Research Database (Denmark)

    Carstensen, Peter; Vinter, Otto

    2017-01-01

    Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature that is the found...

  20. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Nevada Site Office, Las Vegas, NV (United States)

    2016-02-01

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) were evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.

  1. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick

    2016-01-01

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) were evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material - including lead plates, lead bricks, and lead-shielded cables was removed during the investigation and requires no additional corrective action.

  2. Health and Safety First

    CERN Document Server

    2013-01-01

    At CERN, health and safety underpin everything we do. We have strict operational procedures in place, as well as health, safety and environment (HSE) requirements to make our working environment as safe as possible. It’s everyone’s responsibility to follow these procedures and requirements to keep ourselves, and our colleagues, safe. We have a very good safety and operational record at CERN stretching back almost 60 years, but there is never room for complacency.   With this very much in mind, we have developed a robust plan for implementation if something unforeseen goes wrong.  Because however careful we all are, accidents do happen, and the mark of any organisation that aspires to be among the best in the world is how quickly and efficiently it acts when they do. A small team made up of people from several departments at CERN has produced a strategic crisis management plan that we can put into action should a major incident occur.  This plan focuses on...

  3. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    Science.gov (United States)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  4. Implementation plan for the Defense Nuclear Facilities Safety Board Recommendation 90-7

    International Nuclear Information System (INIS)

    Borsheim, G.L.; Cash, R.J.; Dukelow, G.T.

    1992-12-01

    This document revises the original plan submitted in March 1991 for implementing the recommendations made by the Defense Nuclear Facilities Safety Board in their Recommendation 90-7 to the US Department of Energy. Recommendation 90-7 addresses safety issues of concern for 24 single-shell, high-level radioactive waste tanks containing ferrocyanide compounds at the Hanford Site. The waste in these tanks is a potential safety concern because, under certain conditions involving elevated temperatures and low concentrations of nonparticipating diluents, ferrocyanide compounds in the presence of oxidizing materials can undergo a runaway (propagating) chemical reaction. This document describes those activities underway by the Hanford Site contractor responsible for waste tank safety that address each of the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7. This document also identifies the progress made on these activities since the beginning of the ferrocyanide safety program in September 1990. Revised schedules for planned activities are also included

  5. Tank waste remediation system nuclear criticality safety inspection and assessment plan

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This plan provides a management approved procedure for inspections and assessments of sufficient depth to validate that the Tank Waste Remediation System (TWRS) facility complies with the requirements of the Project Hanford criticality safety program, NHF-PRO-334, ''Criticality Safety General, Requirements''

  6. SADC establishes a regional action plan.

    Science.gov (United States)

    Klouda, T

    1997-02-01

    The regional meeting held on AIDS strategy in Lilongwe, Malawi, in December, 1996, made important advances. The 12 countries of the SADC (Southern Africa Development Community) joined the European Union to institute a regional action plan for the reduction of susceptibility of people to HIV because of social, cultural, and environmental factors; the vulnerability of people with HIV infection to social and other difficulties; and the vulnerability of institutions because of the foregoing impacts. At the conference the issues explored were employment, mining, medical drugs, education, and tourism. An employment charter was seen as crucial for the success of AIDS and workplace activities. Facilitation of travel across borders was important for the reduction of susceptibility to HIV infection. Enhancement of regional policies for essential drugs was vital for drugs for the treatment of AIDS. The clarification of the regional role was critical for regional support of national action (strengthening technical and institutional capacities) and for regional joint action such as studies on research, harmonization of data collection on HIV/AIDS; organization of training; development of information and education on HIV/AIDS; facilitation of manufacturing of drugs and condoms; and the development of a regional information and education program about HIV/AIDS. The conference also clarified HIV/AIDS programs in relation to other health and socioeconomic problems.

  7. A randomized controlled trial to evaluate the Make Safe Happen® app-a mobile technology-based safety behavior change intervention for increasing parents' safety knowledge and actions.

    Science.gov (United States)

    McKenzie, Lara B; Roberts, Kristin J; Clark, Roxanne; McAdams, Rebecca; Abdel-Rasoul, Mahmoud; Klein, Elizabeth G; Keim, Sarah A; Kristel, Orie; Szymanski, Alison; Cotton, Christopher G; Shields, Wendy C

    2018-03-12

    Many unintentional injuries that occur in and around the home can be prevented through the use of safety equipment and by consistently following existing safety recommendations. Unfortunately, uptake of these safety behaviors is unacceptably low. This paper describes the design of the Make Safe Happen® smartphone application evaluation study, which aims to evaluate a mobile technology-based safety behavior change intervention on parents' safety knowledge and actions. Make Safe Happen® app evaluation study is a randomized controlled trial. Participants will be parents of children aged 0-12 years who are recruited from national consumer online survey panels. Parents will complete a pretest survey, and will be randomized to receive the Make Safe Happen® app or a non-injury-related app, and then complete a posttest follow-up survey after 1 week. Primary outcomes are: (1) safety knowledge; (2) safety behaviors; (3) safety device acquisition and use, and (4) behavioral intention to take safety actions. Anticipated study results are presented. Wide-reaching interventions, to reach substantial parent and caregiver audiences, to effectively reduce childhood injuries are needed. This study will contribute to the evidence-base about how to increase safety knowledge and actions to prevent home-related injuries in children. NCT02751203 ; Pre-results.

  8. Corrective Action Decision Document/Closure Report for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick K. [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2015-02-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 550: Smoky Contamination Area, Nevada National Security Site, Nevada. CAU 550 includes 19 corrective action sites (CASs), which consist of one weapons-related atmospheric test (Smoky), three safety experiments (Ceres, Oberon, Titania), and 15 debris sites (Table ES-1). The CASs were sorted into the following study groups based on release potential and technical similarities: • Study Group 1, Atmospheric Test • Study Group 2, Safety Experiments • Study Group 3, Washes • Study Group 4, Debris The purpose of this document is to provide justification and documentation supporting the conclusion that no further corrective action is needed for CAU 550 based on implementation of the corrective actions listed in Table ES-1. Corrective action investigation (CAI) activities were performed between August 2012 and October 2013 as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area; and in accordance with the Soils Activity Quality Assurance Plan. The approach for the CAI was to investigate and make data quality objective (DQO) decisions based on the types of releases present. The purpose of the CAI was to fulfill data needs as defined during the DQO process. The CAU 550 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs.

  9. LMFBR safety experiment facility planning and analysis

    International Nuclear Information System (INIS)

    Stevenson, M.G.; Scott, J.H.

    1976-01-01

    In the past two years considerable effort has been placed on the planning and design of new facilities for the resolution of LMFBR safety issues. The paper reviews the key issues, the experiments needed to resolve them, and the design aspects of proposed new facilities. In addition, it presents a decision theory approach to selecting an optimal combination of modified and new facilities

  10. Safety evaluation by living probabilistic safety assessment. Procedures and applications for planning of operational activities and analysis of operating experience

    International Nuclear Information System (INIS)

    Johanson, Gunnar; Holmberg, J.

    1994-01-01

    Living Probabilistic Safety Assessment (PSA) is a daily safety management system and it is based on a plant-specific PSA and supporting information systems. In the living use of PSA, plant status knowledge is used to represent actual plant safety status in monitoring or follow-up perspective. The PSA model must be able to express the risk at a given time and plant configuration. The process, to update the PSA model to represent the current or planned configuration and to use the model to evaluate and direct the changes in the configuration, is called living PSA programme. The main purposes to develop and increase the usefulness of living PSA are: Long term safety planning: To continue the risk assessment process started with the basic PSA by extending and improving the basic models and data to provide a general risk evaluation tool for analyzing the safety effects of changes in plant design and procedures. Risk planning of operational activities: To support the operational management by providing means for searching optimal operational maintenance and testing strategies from the safety point of view. The results provide support for risk decision making in the short term or in a planning mode. The operational limits and conditions given by technical specifications can be analyzed by evaluating the risk effects of alternative requirements in order to balance the requirements with respect to operational flexibility and plant economy. Risk analysis of operating experience: To provide a general risk evaluation tool for analyzing the safety effects of incidents and plant status changes. The analyses are used to: identify possible high risk situations, rank the occurred events from safety point of view, and get feedback from operational events for the identification of risk contributors. This report describes the methods, models and applications required to continue the process towards a living use of PSA. 19 tabs, 20 figs

  11. RA reactor action plan for 1977 - Annex VI; Prilog VI - Plan rada reaktora RA za 1977. godinu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1976-12-15

    In the RA reactor action plan for 1977 it is foreseen that the reactor would be operated for 181 days, mostly at nominal power of 6.5 MW. It is planned to produce 28236 MWh in total. Five reactor core exchanges (refuelling) are planned. The plan includes time for repair of components as well as for cooling. [Serbo-Croat] Plan rada reaktora RA predvidja rad tokom 181 dana, vecim delom na nominalnoj snazi od 6,5 MW tokom 1977. godine. Planirano je da ukupni rad iznosi 28236 MWh. Planom je predvidjeno i pet izmena goriva kao i vreme potrebno za remont opreme i hladjenje.

  12. Climate change in Nova Scotia : a background paper to guide Nova Scotia's climate change action plan

    International Nuclear Information System (INIS)

    2007-10-01

    Climate change causes changes in the temperature of the earth, the level of the sea, and the frequency of extreme weather conditions. The province of Nova Scotia recently released an act related to environmental goals and sustainable prosperity. Addressing climate change is a key element in achieving Nova Scotia's sustainable prosperity goals outlined in the act. The Nova Scotia Department of Energy is working towards developing both policy and action, to help meet its target of a 10 per cent reduction in greenhouse gases from 1990 levels by the year 2020. Two major plans are underway, notably a climate change action plan and a renewed energy strategy. This report provided background information on Nova Scotia's climate change action plan. It discussed climate change issues affecting Nova Scotia, air pollutants, energy sources in Nova Scotia, energy consumers in the province, and Nova Scotia's approach to climate change. The report also discussed actions underway and funding sources. It was concluded that in order for the climate change action plan to be successful, Nova Scotians must use energy more efficiently; use renewable energy; use cleaner energy; and plan for change. 13 refs., 2 tabs., 6 figs., 4 appendices

  13. Pedestrian safety action plan.

    Science.gov (United States)

    2009-06-01

    In 2005, Arizona ranked 5th among states in pedestrian fatalities per 100,000 residents, with 164 : pedestrian fatalities on Arizonas roadwaysa nearly 30 percent increase from 2003 levels. To reduce : the number of pedestrian crashes in Arizona...

  14. Motorcoach safety action plan.

    Science.gov (United States)

    2009-11-01

    Motorcoach travel is a very safe mode of highway transportation in the : United States, transporting 750 million passengers per year. Despite this, : over the past 10 years, motorcoach crashes have resulted in an average of 19 : motorcoach occupant f...

  15. Action planning as predictor of health protective and health risk behavior: an investigation of fruit and snack consumption

    Directory of Open Access Journals (Sweden)

    Candel Math

    2009-10-01

    Full Text Available Abstract Background Large discrepancies between people's intention to eat a healthy diet and actual dietary behavior indicate that motivation is not a sufficient instigator for healthy behavior. Research efforts to decrease this 'intention - behavior gap' have centered on aspects of self-regulation, most importantly self-regulatory planning. Most studies on the impact of self-regulatory planning in health and dietary behavior focus on the promotion of health protective behaviors. This study investigates and compares the predictive value of action planning in health protective behavior and the restriction of health risk behavior. Methods Two longitudinal observational studies were performed simultaneously, one focusing on fruit consumption (N = 572 and one on high-caloric snack consumption (N = 585 in Dutch adults. Structural equation modeling was used to investigate and compare the predictive value of action planning in both behaviors, correcting for demographics and the influence of motivational factors and past behavior. The nature of the influence of action planning was investigated by testing mediating and moderating effects. Results Action planning was a significant predictor of fruit consumption and restricted snack consumption beyond the influence of motivational factors and past behavior. The strength of the predictive value of action planning did not differ between the two behaviors. Evidence for mediation of the intention - behavior relationship was found for both behaviors. Positive moderating effects of action planning were demonstrated for fruit consumption, indicating that individuals who report high levels of action planning are significantly more likely to translate their intentions into actual behavior. Conclusion The results indicate that the planning of specific preparatory actions predicts the performance of healthy dietary behavior and support the application of self-regulatory planning in both health protective and health

  16. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    T. M. Fitzmaurice

    2000-01-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection[NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site

  17. The Removal Action Work Plan for CPP-603A Basin Facility

    International Nuclear Information System (INIS)

    B. T. Richards

    2006-01-01

    This revised Removal Action Work Plan describes the actions to be taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The regulatory framework outlined in this Removal Action Work Plan has been modified from the description provided in the Engineering Evaluation/Cost Analysis (DOE/NE-ID-11140, Rev. 1, August 2004). The modification affects regulation of sludge removal, treatment, and disposal, but the end state and technical approaches have not changed. Revision of this document had been delayed until the basin sludge was successfully managed. This revision (Rev. 1) has been prepared to provide information that was not previously identified in Rev. 0 to describe the removal, treatment, and disposal of the basin water at the Idaho National Laboratory (INL) CERCLA Disposal Facility evaporation ponds and fill the basins with grout/controlled low strength material (CLSM) was developed. The Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center - conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act - evaluated risks associated with deactivation of the basins and alternatives for addressing those risks. The decision to remove and dispose of the basin water debris not containing uranium grouted in place after the sludge has been removed and managed under the Hazardous Waste Management Act/Resource Conservation and Recovery Act has been documented in the Act Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center

  18. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  19. 2011-2015 National action plan for the management of radon-related risk

    International Nuclear Information System (INIS)

    2011-01-01

    After an assessment of the 2005-2008 action plan, this report presents the 2011-2015 plan. It comprises five main axis: the implementation of a policy regarding the management of the radon-related risk in existing dwellings, the implementation of a regulation for new dwellings, the follow-up of the regulation regarding public places and that applicable to workers, the development and the implementation of new management tools for the diagnosis of buildings and works performed by professionals, and the coordination of policy regarding investigation and research. Each axis comprises several actions which are defined and presented. Eight key measures are also defined

  20. Preservation of information about the repository for spent nuclear fuels - proposal for action plan

    International Nuclear Information System (INIS)

    Bowen-Schrire, Monica; Eckerhall, Daniel; Jander, Hans; Waniewska, Katarina

    2008-10-01

    This report is a proposal for an action plan with the ultimate aim of ensuring that information about the repository for spent nuclear fuel can be preserved and transferred for future generations. The purpose of the proposal for an action plan is to present ideas on tangible measures and guidelines for information preservation and transfer, in the short and long term. The report deals with a number of aspects relating to information preservation as well as risks that can lead to the loss of important information. The proposal for an action plan is based on reasoning about these subjects. The main emphasis is on measures that need to be implemented in the near future to ensure that successive and direct information transfer is handled in a suitable manner. It is suggested that the following measures should be implemented within a five-year period: - Designate a person responsible for information preservation. - Work out guidelines for information preservation and transfer. - Form a network with other organizations in Sweden. - Initiate a dialogue with other countries, especially USA and France. - Participate in seminars, conferences and workgroups on an international level within the IAEA and NEA. In a longer time perspective the following measures should also be implemented: - Implement guidelines for information preservation and transfer. - Document the archiving system. - Establish a communication plan. - Archive information about the repository. - Keep the action plan up to date

  1. Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-05-08

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Station (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  2. Training Effectiveness Assessment of Red Cape: Crisis Action Planning and Execution

    National Research Council Canada - National Science Library

    Schaefer, Peter S; Shadrick, Scott B; Beaubien, Jeff; Crabb, Brian T

    2008-01-01

    The crisis response training program Red Cape: Crisis Action Planning and Execution uses theme-based training and multimedia scenarios to instill expert thinking patterns in crisis response personnel...

  3. Pre-Planning Civic Action: An Analysis of Civic Leaders' Problem Solving Strategies

    Science.gov (United States)

    Fitzgerald, Jason

    2016-01-01

    This study explores the civic thinking heuristics that civic leaders use when pre-planning action. Across eight think-aloud protocols, findings suggest that three heuristics are employed. "Frame alignment" refers to the process of harmonizing personal beliefs and interests with the particulars of a civic action issue to find personal…

  4. Handling of future human actions in the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Moren, Lena

    2006-10-01

    This report documents the future human actions (FHA) considered in the long-term safety analysis of a KBS-3 repository. The report is one of the supporting documents to the safety assessment SR-Can. The purpose of this report is to provide an account of: General considerations concerning FHA; The methodology applied in SR-Can to assess FHA; The aspects of FHA that need to be considered in the evaluation of their impact on a deep geological repository; and The selection of representative scenarios for illustrative consequence analysis

  5. Handling of future human actions in the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Moren, Lena

    2006-10-15

    This report documents the future human actions (FHA) considered in the long-term safety analysis of a KBS-3 repository. The report is one of the supporting documents to the safety assessment SR-Can. The purpose of this report is to provide an account of: General considerations concerning FHA; The methodology applied in SR-Can to assess FHA; The aspects of FHA that need to be considered in the evaluation of their impact on a deep geological repository; and The selection of representative scenarios for illustrative consequence analysis.

  6. Reducing our Carbon Footprint - an initial action plan for Northern Ireland

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-11-14

    In the Energy White Paper, Our Energy Future - Creating a low carbon economy, the UK Government accepted the Royal Commission on Environmental Pollution's (RCEP) recommendations on how the UK should address the threat of climate change. These recommendations included the early development of a concerted, coordinated and integrated strategy across all Government Departments that would put the UK economy on an early path to reducing carbon dioxide (CO{sub 2}) emissions by at least 60% by 2050. Responding to this challenge, the Carbon Trust and Invest NI sponsored a project to develop an action plan that will set Northern Ireland on the path to realising the deep reductions in carbon emissions needed to reach this target. During the project, the prospects for reducing CO{sub 2} emissions (or carbon emissions) in five key sectors of the economy were examined. The main conclusion of this work was that it was possible to realise a 60% reduction in carbon emissions by 2050, provided early action is taken to set Northern Ireland on the path to a low carbon economy. The project also prepared an initial action plan to help initiate change. This consists of: Immediate actions, including encouraging the uptake of energy efficiency measures, revising building regulations and changing public procurement procedures. Developing options for the future, by supporting the exploitation of renewable resources, modifying the regulatory scheme to support combined heat and power (CHP) and encouraging additional investment in low carbon technologies. Cross-cutting actions, including developing planning procedures that take account of sustainability, marketing campaigns to capture hearts and minds, developing a skills base in low carbon technologies and exploring more radical ways of cutting carbon emissions. (UK)

  7. Krsko NPP Quality Assurance Plan Application to Nuclear Safety Upgrade Projects (PCFV System and PAR System)

    International Nuclear Information System (INIS)

    Biscan, Romeo; Fifnja, Igor

    2014-01-01

    Implementation of modifications was verified and approved through continuous QA and QC involvement (modification team members). · QA and QC engineers performed several observations of the 1008-VA-L and 1002-GH-L modification installation activities in the technological part of the plant. · New or revised plant procedures, applicable to modifications 1008-VA-L and 1002-GH-L, were verified and approved by QA. · QA and QC engineers were involved in review and monitoring of corrective actions implementation through Corrective Action Program. Quality Assurance involvement in plant modification processes (1008-VA-L and 1002-GH-L) has fulfilled its important role and expectations in achieving overall quality goals and to ensure safe and efficient power plant operation. QA program requirements, as presented in Krsko NPP Quality Assurance Plan, were extended to all participants consistent with the importance of their services and scope of supply for nuclear safety. (authors)

  8. Projects of Strategic Action Plan of S&T Innovation

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    @@ In July 2001, CAS decided to shift the focus of the current Knowledge Innovation Program (KIP) onto research projects designed to meet the country's strategic needs, and Iaunched the strategic action plan of innovation (SAPI). Under the SAPI, CAS organized the implementation of seven major projects in 2001.The followings are their profiles.

  9. Work Plans 2011 – Norwegian Scientific Committee for Food Safety

    OpenAIRE

    Norwegian Scientific Committee for Food Safety

    2011-01-01

    The annual work plan for 2011 summaries activities for the Scientific Steering Committee and the 9 panels of the Norwegian Scientific Committee for Food Safety (VKM). VKM carries out independent risk assessments for the Norwegian Food Safety Authority across the Authority’s field of responsibility as well as environmental risk assessments of genetically modified organisms for the Directorate for Nature Management.

  10. Understanding what helps or hinders asthma action plan use: a systematic review and synthesis of the qualitative literature.

    Science.gov (United States)

    Ring, Nicola; Jepson, Ruth; Hoskins, Gaylor; Wilson, Caroline; Pinnock, Hilary; Sheikh, Aziz; Wyke, Sally

    2011-11-01

    To understand better what helps and/or hinders asthma action plan use from the professionals and patients/carers perspective. Systematic review and qualitative synthesis (using meta-ethnography). Nineteen studies (20 papers) were included in an analysis of patients/carers' and professionals' views. Seven main influences on action plan implementation were identified including perceived un-helpfulness and irrelevance of the plans. Translation and synthesis of the original authors' interpretations suggested that action plan promotion and use was influenced by professional and patient/carers' asthma beliefs and attitudes and patient/carer experiences of managing asthma. Action plan use is hindered because professionals and patients/carers have different explanatory models of asthma, its management and their respective roles in the management process. Patients/carers, based on their experiential knowledge of their condition, perceive themselves as capable, effective in managing their asthma, but health professionals do not always share this view. Professionally provided medically focused action plans that do not 'fit' with and incorporate the patients'/carers' views of asthma, and their management strategies, will continue to be under-utilised. Professionals need to develop a more patient-centred, partnership-based, approach to the joint development and review of action plans, recognising the experiential asthma knowledge of patients/carers. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  11. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  12. Statement to Second Extraordinary Meeting of Contracting Parties to Convention on Nuclear Safety, 27 August 2012, Vienna, Austria

    International Nuclear Information System (INIS)

    Amano, Y.

    2012-01-01

    Full Text: I am pleased to address this Second Extraordinary Meeting of the Contracting Parties to the Convention on Nuclear Safety. This important meeting will be closely watched by the global nuclear community. I know you will make good use of this opportunity to consider further measures to strengthen nuclear safety throughout the world in the light of the lessons which we are still learning from the Fukushima Daiichi accident. One year after the adoption of the IAEA Action Plan on Nuclear Safety, significant progress has been made in several key areas. These include the assessment of safety vulnerabilities of nuclear power plants, strengthening IAEA peer review services, improving emergency preparedness and response capabilities and reviewing IAEA safety standards. Your work this week will address the request to Contracting Parties, expressed in the Action Plan, to explore mechanisms to enhance the effective implementation of Safety Conventions and to consider proposals to amend the Convention on Nuclear Safety. You will recall that last year's Ministerial Declaration stressed 'the importance of universal adherence to, and the effective implementation and continuous review of, the relevant international instruments on nuclear safety'. The Action Plan encouraged Member States to work cooperatively to maximize the lessons learned from the Fukushima Daiichi accident and to produce concrete results as soon as possible. The IAEA has reported periodically to Member States about its work to implement the Action Plan. We have also organised a number of international expert meetings to analyse technical aspects of the accident and ensure that the right lessons are learned. The results of this Extraordinary Meeting will provide an important input to future considerations of implementation of the Action Plan. Our Member States will review implementation at the Agency's 56th General Conference next month, while the Fukushima Ministerial Conference on Nuclear Safety in

  13. Controlling Attention through Action: Observing Actions Primes Action-Related Stimulus Dimensions

    Science.gov (United States)

    Fagioli, Sabrina; Ferlazzo, Fabio; Hommel, Bernhard

    2007-01-01

    Previous findings suggest that planning an action "backward-primes" perceptual dimension related to this action: planning a grasp facilitates the processing of visual size information, while planning a reach facilitates the processing of location information. Here we show that dimensional priming of perception through action occurs even in the…

  14. Local climate action plans in climate change mitigation

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2016-01-01

    the extent, targets and scope of LG CAPs and find that Danish LGs are highly involved in mitigation activities with a widespread CAP adoption and an overall high degree of sectoral coverage on base year accounts and action plans, albeit with some significant shortcomings. Different approaches for target...... and scope definition are identified and assessed, and the overall contribution of LGs to the Danish energy transition is discussed....

  15. Criteria for safety-related nuclear-power-plant operator actions: 1982 pressurized-water-reactor (PWR) simulator exercises

    International Nuclear Information System (INIS)

    Crowe, D.S.; Beare, A.N.; Kozinsky, E.J.; Haas, P.M.

    1983-06-01

    The primary objective of the Safety-Related Operator Action (SROA) Program at Oak Ridge National Laboratory is to provide a data base to support development of criteria for safety-related actions by nuclear power plant operators. When compared to field data collected on similar events, a base of operator performance data developed from the simulator experiments can then be used to establish safety-related operator action design evaluation criteria, evaluate the effects of performance shaping factors, and support safety/risk assessment analyses. This report presents data obtained from refresher training exercises conducted in a pressurized water reactor (PWR) power plant control room simulator. The 14 exercises were performed by 24 teams of licensed operators from one utility, and operator performance was recorded by an automatic Performance Measurement System. Data tapes were analyzed to extract operator response times (RTs) and error rate information. Demographic and subjective data were collected by means of brief questionnaires and analyzed in an attempt to evaluate the effects of selected performance shaping factors on operator performance

  16. The role of action and coping planning in the relationship between intention and physical activity: a moderated mediation analysis.

    Science.gov (United States)

    Caudroit, Johan; Boiché, Julie; Stephan, Yannick

    2014-01-01

    Using a moderated mediation model, the present study investigated whether the mediation of intention into physical activity (PA) behaviour via action planning depends on the level of coping planning. A four-month prospective study was conducted among 157 French adults, who were recruited through a web-based survey. They were administrated measures of behavioural intention and sociodemographic variables at baseline and action and coping planning and PA four months later. Action planning partially mediated the contribution of intention on PA level. However, this indirect effect was conditional on the level of coping planning, insofar as action planning acted as a mediator of the intention-PA relationship only for individuals with high level of coping planning. The results highlight the complexity of the relationship between intention and behaviour and provide evidence for the distinct role of both forms of planning.

  17. Segurança e produção: um modelo para o planejamento e controle integrado Safety and production: an integrated planning and control model

    Directory of Open Access Journals (Sweden)

    Tarcisio A. Saurin

    2002-01-01

    Full Text Available Este artigo apresenta um modelo de planejamento e controle da segurança no trabalho (PCS integrado ao processo de planejamento e controle da produção (PCP. O modelo foi desenvolvido por meio de dois estudos empíricos em obras industriais, adotando-se a pesquisa ação como estratégia de pesquisa. Os requisitos de segurança são integrados ao PCP em três níveis hierárquicos deste processo. No nível de longo prazo, o planejamento da segurança é configurado pelo desenvolvimento de análises preliminares de risco dos processos construtivos. A atualização e detalhamento da implantação destes planos é então feita por meio de sua integração aos níveis de médio e curto prazo do PCP.This paper presents a safety planning and control model (SPC that has been integrated to the production planning and control process. The model was developed through two action research empirical studies in industrial construction projects. Safety requirements are integrated into three hierarchical levels of planning and control process. At the long-term level, safety planning is featured by preliminary hazard analysis of construction processes. These plans are updated and detailed through its integration into both medium-term and short-term planning levels.

  18. Corrective action investigation plan for Corrective Action Unit Number 427: Area 3 septic waste system numbers 2 and 6, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the Area 3 Compound, specifically Corrective Action Unit (CAU) Number 427, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, Nevada. The Corrective Action Unit Work Plan, Tonopah Test Range, Nevada divides investigative activities at TTR into Source Groups. The Septic Tanks and Lagoons Group consists of seven CAUs. Corrective Action Unit Number 427 is one of three septic waste system CAUs in TTR Area 3. Corrective Action Unit Numbers 405 and 428 will be investigated at a future data. Corrective Action Unit Number 427 is comprised of Septic Waste Systems Number 2 and 6 with respective CAS Numbers 03-05-002-SW02 and 03-05-002-SW06

  19. Perinatal safety: from concept to nursing practice.

    Science.gov (United States)

    Lyndon, Audrey; Kennedy, Holly Powell

    2010-01-01

    Communication and teamwork problems are leading causes of documented preventable adverse outcomes in perinatal care. An essential component of perinatal safety is the organizational culture in which clinicians work. Clinicians' individual and collective authority to question the plan of care and take action to change the direction of a clinical situation in the patient's best interest can be viewed as their "agency for safety." However, collective agency for safety and commitment to support nurses in their role of advocacy is missing in many perinatal care settings. This article draws from Organizational Accident Theory, High Reliability Theory, and Symbolic Interactionism to describe the nurse's role in maintaining safety during labor and birth in acute care settings and suggests actions for supporting the perinatal nurse at individual, group, and systems levels to achieve maximum safety in perinatal care.

  20. Perinatal Safety: From Concept to Nursing Practice

    Science.gov (United States)

    Kennedy, Holly Powell

    2010-01-01

    Communication and teamwork problems are leading causes of documented preventable adverse outcomes in perinatal care. An essential component of perinatal safety is the organizational culture in which clinicians work. Clinicians’ individual and collective authority to question the plan of care and take action to change the direction of a clinical situation in the patient’s best interest can be viewed as their “agency for safety.” However, collective agency for safety and commitment to support nurses in their advocacy role is missing in many perinatal care settings. This paper draws from Organizational Accident Theory, High Reliability Theory, and Symbolic Interactionism to describe the nurse’s role in maintaining safety during labor and birth in acute care settings, and suggests actions for supporting the perinatal nurse at individual, group, and systems levels to achieve maximum safety in perinatal care. PMID:20147827

  1. RISMC Advanced Safety Analysis Project Plan – FY 2015 - FY 2019

    Energy Technology Data Exchange (ETDEWEB)

    Szilard, Ronaldo H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Youngblood, Robert [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    In this report, a project plan is developed, focused on industry applications, using Risk-Informed Safety Margin Characterization (RISMC) tools and methods applied to realistic, relevant, and current interest issues to the operating nuclear fleet. RISMC focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. This set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. The proposed plan will focus on application of the RISMC toolkit, in particular, solving realistic problems of important current issues to the nuclear industry, in collaboration with plant owners and operators to demonstrate the usefulness of these tools in decision making.

  2. 76 FR 55056 - Toy Safety Standard: Strategic Outreach and Education Plan

    Science.gov (United States)

    2011-09-06

    ... to test and certify to the toy safety standard. We plan to use traditional and social media to... testing and certification requirements for children's toys and toy chests and their compliance with ASTM... manufacturers of children's toys must ensure that covered toys are tested for compliance with the toy safety...

  3. 12 CFR 263.303 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... member bank will take to correct the deficiency and the time within which those steps will be taken. (c... FEDERAL RESERVE SYSTEM RULES OF PRACTICE FOR HEARINGS Submission and Review of Safety and Soundness... safety and soundness compliance plan. (a) Schedule for filing compliance plan—(1) In general. A State...

  4. Selenide isotope generator for the Galileo Mission: safety test plan

    International Nuclear Information System (INIS)

    1979-01-01

    The intent of this safety test plan is to outline particular kinds of safety tests designed to produce information which would be useful in the safety analysis process. The program deals primarily with the response of the RTG to accident environments; accordingly two criteria were established: (1) safety tests should be performed for environments which are the most critical in terms of risk contribution; and (2) tests should be formulated to determine failure conditions for critical heat source components rather than observe heat source response in reference accident environments. To satisfy criterion 1. results of a recent safety study were used to rank various accidents in terms of expected source terms. Six kinds of tests were then proposed which would provide information meeting the second criterion

  5. Maintenance Action Readiness Assessment Plan for Waste Area Grouping 1 inactive Tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-07-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the maintenance action consisting of remediation of four inactive liquid low-level radioactive tanks in Waste Area Grouping 1 at Oak Ridge National Laboratory. The four tanks to be remediated are Tanks 3001-B, 3004-B, T-30, and 3013. Tanks 3001-B, 3004-B, and T-30 will be removed from the ground. Because of logistical issues associated with excavation and site access, Tank 3013 will be grouted in place and permanently closed. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act, because the risk to human health and environment is well below the US Environmental Protection Agency's level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. A Readiness Assessment Team has been assembled to review the criteria deemed necessary to conduct the remediation tasks. These criteria include approval of all plans, acquisition of needed equipment, completion of personnel training, and coordination with plant health and safety personnel. Once the criteria have been met and documented, the task will begin. The readiness assessment is expected to be completed by late July 1995, and the task will begin thereafter

  6. Effective corrective actions to enhance operational safety of nuclear installations

    International Nuclear Information System (INIS)

    2005-07-01

    The safe operation of nuclear power plants around the world and the prevention of incidents in these installations remain key concerns for the nuclear community. In this connection the feedback of operating experience plays a major role: every nuclear plant operator needs to have a system in place to identify and feed back the lessons learned from operating experience and to implement effective corrective actions to prevent safety events from reoccurring. An effective operating experience programme also includes a proactive approach that is aimed at preventing the first-time occurrence of safety events. In April 2003, the IAEA issued the PROSPER guidelines for nuclear installations to strengthen and enhance their own operating experience process and for self-assessment on the effectiveness of the feedback process. Subsequently, in the course of the Operational Safety Review Teams missions conducted by the IAEA that focused on the operational safety practices of nuclear power plants, the IAEA enhanced the review of the operating experience in nuclear power plants by implementing a new module that is derived from these guidelines. In order to highlight the effective implementation of the operating experience programme and to provide practical assistance in this area, the IAEA organized workshops and conferences to discuss recent trends in operating experience. The IAEA also performed assistance and review missions at plants and corporate organizations. The IAEA is further developing advice and assistance on operating experience feedback programmes and is reporting on good practices. The present publication is the outcome of two years of coordinated effort involving the participation of experts of nuclear organizations in several Member States. It provides information and good practices for successfully establishing an effective corrective actions programme. This publication forms part of a series that develops the principles set forth in these guidelines

  7. School Health Index: A Self-Assessment and Planning Guide. Middle School/High School.

    Science.gov (United States)

    Barrios, Lisa C.; Burgeson, Charlene R.; Crossett, Linda; Harrykissoon, Samantha D.; Pritzl, Jane; Wechsler, Howell; Kuester, Sarah A.; Pederson, Linda; Graffunder, Corinne; Rainford, Neil; Sleet, David

    2004-01-01

    The "School Health Index" is a self-assessment and planning guide that will enable schools to: (1) identify the strengths and weaknesses of school policies and programs for promoting health and safety; (2) develop an action plan for improving student health and safety, and (3) involve teachers, parents, students, and the community in improving…

  8. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    International Nuclear Information System (INIS)

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action

  9. HiTEC: a connectionist model of the interaction between perception and action planning.

    Science.gov (United States)

    Haazebroek, Pascal; Raffone, Antonino; Hommel, Bernhard

    2017-11-01

    Increasing evidence suggests that perception and action planning do not represent separable stages of a unidirectional processing sequence, but rather emerging properties of highly interactive processes. To capture these characteristics of the human cognitive system, we have developed a connectionist model of the interaction between perception and action planning: HiTEC, based on the Theory of Event Coding (Hommel et al. in Behav Brain Sci 24:849-937, 2001). The model is characterized by representations at multiple levels and by shared representations and processes. It complements available models of stimulus-response translation by providing a rationale for (1) how situation-specific meanings of motor actions emerge, (2) how and why some aspects of stimulus-response translation occur automatically and (3) how task demands modulate sensorimotor processing. The model is demonstrated to provide a unitary account and simulation of a number of key findings with multiple experimental paradigms on the interaction between perception and action such as the Simon effect, its inversion (Hommel in Psychol Res 55:270-279, 1993), and action-effect learning.

  10. Is it necessary to plan with safety margins for actively scanned proton therapy?

    Science.gov (United States)

    Albertini, F.; Hug, E. B.; Lomax, A. J.

    2011-07-01

    In radiation therapy, a plan is robust if the calculated and the delivered dose are in agreement, even in the case of different uncertainties. The current practice is to use safety margins, expanding the clinical target volume sufficiently enough to account for treatment uncertainties. This, however, might not be ideal for proton therapy and in particular when using intensity modulated proton therapy (IMPT) plans as degradation in the dose conformity could also be found in the middle of the target resulting from misalignments of highly in-field dose gradients. Single field uniform dose (SFUD) and IMPT plans have been calculated for different anatomical sites and the need for margins has been assessed by analyzing plan robustness to set-up and range uncertainties. We found that the use of safety margins is a good way to improve plan robustness for SFUD and IMPT plans with low in-field dose gradients but not necessarily for highly modulated IMPT plans for which only a marginal improvement in plan robustness could be detected through the definition of a planning target volume.

  11. RA reactor Action plan for 1978 - Annex VI; Prilog VI - Plan rada reaktora RA za 1978. godinu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-12-15

    This annex include a detailed monthly action plan of the RA reactor for 1978. It was planned that the reactor will operate at nominal and lower power levels for 158 days. The plan is made with the aim to achieve same annual neutron flux as in 1977, which is somewhat higher then the annual production in the period from 1968-1975. [Serbo-Croat] Ovaj prilog sadrzi detaljan plan rada reaktora RA za 1978. godinu. Planirano je da reaktor radi na nominalnoj snazi of 6,5 MW i na manjim snagama ukupno 158 dana. Plan je napravljen tako da se ostvari godisnja proizvodnja neutronskog fluksa u obimu koji je relaizovan 1977. godine sto je nesto vise od godisnje proizvodnje u periodu 1968-1975.

  12. Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-05-01

    This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

  13. 12 CFR 570.3 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... compliance plan shall include a description of the steps the savings association will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance... plan. (a) Schedule for filing compliance plan—(1) In general. A savings association shall file a...

  14. Planning and Preparing for Emergency Response to Transport Accidents Involving Radioactive Material. Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide provides guidance on various aspects of emergency planning and preparedness for dealing effectively and safely with transport accidents involving radioactive material, including the assignment of responsibilities. It reflects the requirements specified in Safety Standards Series No. TS-R-1, Regulations for the Safe Transport of Radioactive Material, and those of Safety Series No. 115, International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. Contents: 1. Introduction; 2. Framework for planning and preparing for response to accidents in the transport of radioactive material; 3. Responsibilities for planning and preparing for response to accidents in the transport of radioactive material; 4. Planning for response to accidents in the transport of radioactive material; 5. Preparing for response to accidents in the transport of radioactive material; Appendix I: Features of the transport regulations influencing emergency response to transport accidents; Appendix II: Preliminary emergency response reference matrix; Appendix III: Guide to suitable instrumentation; Appendix IV: Overview of emergency management for a transport accident involving radioactive material; Appendix V: Examples of response to transport accidents; Appendix VI: Example equipment kit for a radiation protection team; Annex I: Example of guidance on emergency response to carriers; Annex II: Emergency response guide.

  15. 42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action on...

  16. National action plan to reduce smoking during pregnancy: the National Partnership to Help Pregnant Smokers Quit.

    Science.gov (United States)

    Orleans, Tracy; Melvin, Cathy; Marx, Joseph; Maibach, Edward; Vose, Kathryn Kahler

    2004-04-01

    Although there has been remarkable progress and momentum toward achieving smoke-free pregnancies in the United States since 1990, concerted action is needed to close the remaining gaps in treatment and prevention so that we can reach the Healthy People 2010 goal for pregnant smokers: a prevalence of 1% or less. This need for action led to the formation of the National Partnership to Help Pregnant Smokers Quit, a collaboration among more than 50 organizations and agencies, public and private, that have joined forces to help pregnant smokers quit by providing proven clinical and community-based interventions to every pregnant smoker. This article summarizes the action plan developed by the partnership, the strategies it outlines, and some of the actions taken by partners over the past year to put the plan into action. Action is planned and progress is being made in five strategic areas: offering help through the health care system; using the media effectively; harnessing community and worksite resources; promoting policies known to increase smoking cessation efforts and successes; and expanding national research, surveillance, and evaluation efforts.

  17. U.S. Nuclear Regulatory Commission human factors program plan

    International Nuclear Information System (INIS)

    1986-04-01

    The purpose of the U.S. Nuclear Regulatory Commission (NRC) Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design and operation of nuclear facilities. This revised plan addresses human factors issues related to the operation of nuclear power plants (NPPs). The three issues of concern are (1) the activities planned to provide the technical bases to resolve the remaining tasks related to human factors as described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the need to address the additional human factors efforts that were identified during implementation of the Action Plan; and (3) the actual fulfillment of those developmental activities specified in Revision 1 of this plan. The plan represents a systematic approach for addressing high priority human factors concerns important to NPP safety in FY 1986 through 1987

  18. Empowering the child and caregiver: yellow zone Asthma Action Plan.

    Science.gov (United States)

    Dinakar, Chitra; Portnoy, Jay M

    2014-11-01

    Current guidelines, both national and international, elegantly describe evidence-based measures to attain and maintain long-term control of asthma. These strategies, typically discussed between the provider and patient, are provided in the form of written (or electronic) instructions as part of the green zone of the color-coded Asthma Action Plan. The red zone of the Asthma Action Plan has directives on when to use systemic corticosteroids and seek medical attention. The transition zone between the green zone of good control and the red zone of asthma exacerbation is the yellow zone. This zone guides the patient on self-management of exacerbations outside a medical setting. Unfortunately, the only recommendation currently available to patients per the current asthma guidelines is the repetitive use of reliever bronchodilators. This approach, while providing modest symptom relief, does not reliably prevent progression to the red zone. In this document, we present new, evidence-based, yellow zone intervention options.

  19. Commonwealth of the Northern Mariana Islands Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  20. Corrective Action Investigation Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada: Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-05-03

    The general purpose of this Corrective Action Investigation Plan is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective action alternatives (CAAs) for Corrective Action Unit (CAU) 543: Liquid Disposal Units, Nevada Test Site (NTS), Nevada. Located in Areas 6 and 15 on the NTS, CAU 543 is comprised of a total of seven corrective action sites (CASs), one in Area 6 and six in Area 15. The CAS in Area 6 consists of a Decontamination Facility and its components which are associated with decontamination of equipment, vehicles, and materials related to nuclear testing. The six CASs in Area 15 are located at the U.S. Environmental Protection Agency Farm and are related to waste disposal activities at the farm. Sources of possible contamination at Area 6 include potentially contaminated process waste effluent discharged through a process waste system, a sanitary waste stream generated within buildings of the Decon Facility, and radiologically contaminated materials stored within a portion of the facility yard. At Area 15, sources of potential contamination are associated with the dairy operations and the animal tests and experiments involving radionuclide uptake. Identified contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, petroleum hydrocarbons, pesticides, herbicides, polychlorinated biphenyls, metals, and radionuclides. Three corrective action closure alternatives - No Further Action, Close in Place, or Clean Closure - will be recommended for CAU 543 based on an evaluation of all the data quality objective-related data. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of CAAs that will be presented in the Corrective Action Decision Document.

  1. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  2. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  3. Urban planning, traffic planning and traffic safety of pedestrians and cyclists : report presented to the 1979 Road Research Symposium on Safety of Pedestrians and Cyclists, OECD Headquarters, Paris, 14-16 May 1979. Session III: Physical Countermeasures; Subsession III.1: Urban planning and traffic planning.

    NARCIS (Netherlands)

    Wegman, F.C.M.

    1979-01-01

    The traffic safety of pedestrians and cyclists can be improved by means of urban planning and traffic planning, as one of the possibilities. This paper discusses the framework of these measures and activities and also the effects on the field of traffic planning. Chapter I show that it is not

  4. Geotechnical engineering considerations in the NRC's review of uranium mill tailings remedial action plans

    International Nuclear Information System (INIS)

    Gillen, D.M.

    1985-01-01

    To reduce potential health hazards associated with inactive uranium mill tailings sites, the Department of Energy (DOE) is presently investigating and implementing remedial actions at 24 sites in the Uranium Mill Tailings Remedial Action Program (UMTRAP). All remedial actions must be selected and performed with the concurrence of the Nuclear Regulatory Commission (NRC). This paper provides a discussion of geotechnical engineering considerations during the NRC's preconcurrence review of proposed remedial action plans. In order for the NRC staff to perform an adequate geotechnical engineering review, DOE documents must contain a presentation of the properties and stability of all in-situ and engineered soil and rock which may affect the ability of the remedial action plans to meet EPA standards for long-term stability and control. Site investigations, laboratory testing, and remedial action designs must be adequate in scope and technique to provide sufficient data for the NRC staff to independently evaluate static and dynamic stability, settlement, radon attenuation through the soil cover, durability of rock for erosion protection, and other geotechnical engineering factors

  5. Evolution of a holistic systems approach to planning and managing road safety: the Victorian case study, 1970-2015.

    Science.gov (United States)

    Muir, Carlyn; Johnston, Ian R; Howard, Eric

    2018-06-01

    The Victorian Safe System approach to road safety slowly evolved from a combination of the Swedish Vision Zero philosophy and the Sustainable Safety model developed by the Dutch. The Safe System approach reframes the way in which road safety is viewed and managed. This paper presents a case study of the institutional change required to underpin the transformation to a holistic approach to planning and managing road safety in Victoria, Australia. The adoption and implementation of a Safe System approach require strong institutional leadership and close cooperation among all the key agencies involved, and Victoria was fortunate in that it had a long history of strong interagency mechanisms in place. However, the challenges in the implementation of the Safe System strategy in Victoria are generally neither technical nor scientific; they are predominantly social and political. While many governments purport to develop strategies based on Safe System thinking, on-the-ground action still very much depends on what politicians perceive to be publicly acceptable, and Victoria is no exception. This is a case study of the complexity of institutional change and is presented in the hope that the lessons may prove useful for others seeking to adopt more holistic planning and management of road safety. There is still much work to be done in Victoria, but the institutional cultural shift has taken root. Ongoing efforts must be continued to achieve alert and compliant road users; however, major underpinning benefits will be achieved through focusing on road network safety improvements (achieving forgiving infrastructure, such as wire rope barriers) in conjunction with reviews of posted speed limits (to be set in response to the level of protection offered by the road infrastructure) and by the progressive introduction into the fleet of modern vehicle safety features. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights

  6. Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2004-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to CAS 23-02-08. The scope of the corrective action investigation

  7. Smart Buildings: Business Case and Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  8. Motor planning is facilitated by adopting an action's goal posture: An fMRI study

    NARCIS (Netherlands)

    Zimmermann, M.; Meulenbroek, R.G.J.; Lange, F.P. de

    2012-01-01

    Abstract: Motor planning is a hierarchical process that is typically organized around an action's goal (e.g., drinking from a cup). However, the motor plan depends not only on the goal but also on the current body state. Here, we investigated how one's own body posture interacts with planning of

  9. Quantity and quality of written feedback, action plans, and student ...

    African Journals Online (AJOL)

    Background. Mini-clinical-evaluation exercise (mini-CEX) assessment forms that have been modified with the addition of specific spaces on separate sheets are expected to improve the quantity and quality of written feedback and the action plan for further learning which is agreed upon, and to encourage written reflection.

  10. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  11. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  12. Affirmative Action Plan, October 1991--September 1992

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    This report documents Reynolds Electrical Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the Handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations. All personnel decisions are made at the Company level. Decisions regarding the General Manager or Deputy General Manager are made at the corporate level.

  13. WANO Actions to Reinforce the Operators’ Safety Culture Worldwide

    Energy Technology Data Exchange (ETDEWEB)

    Regaldo, J., E-mail: jacques.regaldo@edf.fr [WANO, London (United Kingdom)

    2014-10-15

    Full text: WANO’s mission is to maximize the safety and reliability of nuclear power plants worldwide by working together to assess, to benchmark and improve performance through mutual support, exchange of information and emulation of best practices. Fukushima accident strongly impacted the nuclear community and it also brought WANO to question its positioning and scope of activities. Five strategic actions have hence been decided to strengthen WANO’s role, aiming to bring a more consistent, transparent and integrated response to the nuclear operators. WANO peer review process, which constitutes its core-business, has been intensified including corporate and pre start up peer reviews and, for Japanese plants, restart reviews. WANO also decided to expand its scope of activity to include elements of design, based on the principle that the role of a nuclear operator is not only to operate safely, but also to be sure that the plant he is operating is safe. WANO aims to cooperate strongly at both regional and international levels with all international safety organizations, being convinced that trust can be recovered with a strong safety commitment and credibility of both regulators and operators. All operators, without exception, are WANO members; if membership is voluntary, members have to fulfil strict obligations. Safety supposes that no operator feels isolated, or refuses openness and permanent self-questioning; it requests as well for WANO to ensure that cultural and sometimes political barriers do not hinder safety culture – the accident of Fukushima is from this perspective rich in teachings. In WANO, we believe that management system and practices are at the centre of safety culture, and a full involvement of top management (CEOs) of our members is absolutely requested. Through its commitments and rules, WANO pressures its members and help them reaching the highest possible standard of safety. We consider that we rely on each other to improve safety

  14. Waste convention regulatory impact on planning safety assessment for LILW disposal in Croatia

    International Nuclear Information System (INIS)

    Valcic, I.; Subasic, D.; Lokner, V.

    2000-01-01

    Preparations for establishment of a LILW repository in Croatia have reached a point where a preliminary safety assessment for the prospective facility is being planned. The planning is not based upon the national regulatory framework, which does not require such an assessment at this early stage, but upon the interagency BSS and the IAEA RADWASS programme recommendations because the national regulations are being revised with express purpose to conform to the most recent international standards and good practices. The Waste Convention, which Croatia has ratified in the meantime, supports this approach in principle, but does not appear to have more tangible regulatory relevance for the safety assessment planning. Its actual requirements regarding safety analyses for a repository fall short of the specific assessment concepts practiced in this decade, and could have well been met by the old Croatian regulations from the mid-eighties. (author)

  15. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    Science.gov (United States)

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them.

  16. Buried Waste Integrated Demonstration Commercialization Action Plans second quarter, FY-94

    International Nuclear Information System (INIS)

    Kaupanger, R.M.

    1994-06-01

    The Federal Government is extremely good at creating knowledge and developing new technology. However, our declining market share in many industries points to a weakness in our ability to successfully commercialize new discoveries. BWID assembled a team of qualified experts with expertise in technology transfer and broad-based technology knowledge to assist with this effort. Five new technologies were chosen to develop commercialization action plans. They include Dig-Face Characterization, Imaging Infrared Interferometer for Waste Characterization, Tensor Magnetic Gradiometer, Very Early Time Electromagnetic System, and Virtual Environment Generation of Buried Waste. Each plan includes a short description of the technology, a market overview, a list of potential customers, a description of competitors and the technology's competitive advantage, the status of intellectual property, the status of technology transfer, a table of action items, commercialization contacts, and program contacts

  17. Nuclear emergencies and protective actions

    International Nuclear Information System (INIS)

    Sjoeblom, Klaus

    1995-01-01

    Although technical improvements have increased the safety of new and old nuclear power plants, many simultaneous component failures and/or human errors are improbable but possible. Both the plant (on-site) and the nearby area (off-site) have emergency plans. Rescue service authorities are responsible of the off-site. The main protective actions are sheltering, evacuation and iodine ingestion. The Loviisa off-site emergency plan assumes that a major part of this population takes care of their own protective actions; Rescue service authorities can then concentrate on the coordination activities and to those people who need help. To be able to carry out the protective actions timely and effectively the people should have information on radiation risk and emergency planning. In case of a potential accident the local population should follow the rescue service information and know how to shelter and how to evacuate themselves. Though there are many stockpiles of iodine pellets in the area the rescue service authorities recommend that each household should purchase iodine pellets for their own need. The utility and the rescue service authorities have distributed information brochures to all homes within 30 km from Loviisa NPP since 1990. This brochure gives information on radiation and protective actions in case of an accident. Because the brochures might not stay available and so also the local telephone book contains this information

  18. Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2012-09-01

    Corrective Action Unit (CAU) 105 is located in Area 2 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 105 is a geographical grouping of sites where there has been a suspected release of contamination associated with atmospheric nuclear testing. This document describes the planned investigation of CAU 105, which comprises the following corrective action sites (CASs): • 02-23-04, Atmospheric Test Site - Whitney • 02-23-05, Atmospheric Test Site T-2A • 02-23-06, Atmospheric Test Site T-2B • 02-23-08, Atmospheric Test Site T-2 • 02-23-09, Atmospheric Test Site - Turk These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 105. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with all CAU 105 CASs are from atmospheric nuclear testing activities. The presence and nature of contamination at CAU

  19. Technical evaluation report, TMI action NUREG-0737 (II.D.1), relief and safety valve testing, Comanche Peak, Unit 2, Docket No. 50-446

    International Nuclear Information System (INIS)

    Fineman, C.P.

    1993-01-01

    In the past, safety and relief valves installed in the primary coolant system of light water reactors have performed improperly. As a result, the authors of NUREG-0578 (TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations) and, subsequently, NUREG-0737 (Clarification of TMI Action Plan Requirements) recommended development and completion of programs to do two things. First, the programs should reevaluate the functional performance capabilities of pressurized water reactor safety, relief, and block valves. Second, they should verify the integrity of the pressurizer safety and relief valve piping systems for normal, transient, and accident conditions. This report documents the review of those programs by EG ampersand G Idaho, Inc. Specifically, this report documents the review of the Comanche Peak, Unit 2, Applicant response to the requirement of NUREG-0578 and NUREG-0737. This review found the Applicant provided an acceptable response reconfirming they met General Design Criteria 14, 15 and 30 of Appendix A to 10 CFR 50 for the subject equipment

  20. Annual plan of research on safety techniques against low level radioactive wastes, FY1994-FY1999

    International Nuclear Information System (INIS)

    1994-01-01

    The safety research on the disposal of low level radioactive waste has been promoted based on the annual plan decided by the committee on radiative waste safety regulation of the Nuclear Safety Commission. Hereafter, the disposal of low level radioactive waste in ocean is never selected. As to the subjects of the safety research which should be carried out for five years from 1994, the necessity, the contents of research, the organs that carry out the research and so on were deliberated, and the results are made into the annual plan, therefore, it is reported. The way of thinking on the safety research, the contents for which efforts should be exerted as the safety research, and the matters to which attention should be paid are shown. As for the annual plan of safety research, the necessity and the outline of the safety research on the disposal in strata, the concrete subjects and their contents, and the necessity and the outline of the safety research on the reuse, the concrete subjects and their contents are reported. The radioactive waste is those produced by the operation of nuclear reactor facilities, those containing TRU nuclides and RI waste. (K.I.)