  1. Embracing Safe Ground Test Facility Operations and Maintenance

    Science.gov (United States)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  2. Surveillance and Maintenance Plan for the 105-C Reactor Safe Storage Enclosure

    International Nuclear Information System (INIS)

    Logan, T. E.

    1998-01-01

    This document provides a plan for implementing surveillance and maintenance activities to ensure that the 105-C Reactor Safe Storage Enclosure is maintained in a safe, environmentally secure, and cost-effective manner until subsequent closure during the final disposition phase of decommissioning

  3. Condition based maintenance in the context of opportunistic maintenance

    NARCIS (Netherlands)

    Koochaki, Javid; Bokhorst, Jos A. C.; Wortmann, Hans; Klingenberg, Warse

    2012-01-01

    Condition based maintenance (CBM) uses the operating condition of a component to predict a failure event. Compared to age based replacement (ABR), CBM usually results in higher availability and lower maintenance costs, since it tries to prevent unplanned downtime and avoid unnecessary preventive

  4. Smart aircraft fastener evaluation (SAFE) system: a condition-based corrosion detection system for aging aircraft

    Science.gov (United States)

    Schoess, Jeffrey N.; Seifert, Greg; Paul, Clare A.

    1996-05-01

    The smart aircraft fastener evaluation (SAFE) system is an advanced structural health monitoring effort to detect and characterize corrosion in hidden and inaccessible locations of aircraft structures. Hidden corrosion is the number one logistics problem for the U.S. Air Force, with an estimated maintenance cost of $700M per year in 1990 dollars. The SAFE system incorporates a solid-state electrochemical microsensor and smart sensor electronics in the body of a Hi-Lok aircraft fastener to process and autonomously report corrosion status to aircraft maintenance personnel. The long-term payoff for using SAFE technology will be in predictive maintenance for aging aircraft and rotorcraft systems, fugitive emissions applications such as control valves, chemical pipeline vessels, and industrial boilers. Predictive maintenance capability, service, and repair will replace the current practice of scheduled maintenance to substantially reduce operational costs. A summary of the SAFE concept, laboratory test results, and future field test plans is presented.

  5. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  6. Lessons Learned "Establishing an Electrically Safe Work Condition" Specifically related to Racking Electrical Breakers

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, Tommy Robert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Romero, Philbert Roland [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Garcia, Samuel Anthony [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-11-09

    During low voltage electrical equipment maintenance, a bad breaker was identified. The breaker was racked out from the substation cubicle without following the hazardous energy control process identified in the Integrated Work Document (IWD). The IWD required the substation to be in an electrically safe work condition prior to racking the breaker. Per NFPA 70E requirements, electrical equipment shall be put into an electrically safe work condition before an employee performs work on or interacts with equipment in a manner that increases the likelihood of creating an arc flash. Racking in or out a breaker on an energized bus may increase the likelihood of creating an arc flash dependent on equipment conditions. A thorough risk assessment must be performed prior to performing such a task. The risk assessment determines the risk control measures to be put in place prior to performing the work. Electrical Safety Officers (ESO) can assist in performing risk assessments and incorporating risk control measures.

  7. Collaborative learning in condition based maintenance

    NARCIS (Netherlands)

    Koochaki, J.; Ao, SI; Gelman, L; Hukins, DWL; Hunter, A; Korsunsky, AM

    2009-01-01

    In recent years, the importance of reliable and consistent production equipments has increased. As a result, companies are shifting their maintenance policy from preventive maintenance towards Condition Based Maintenance (CBM). Despite the growing trend in this area and success stories of CBM

  8. How safe is defect specific maintenance of steam generator tubes?

    International Nuclear Information System (INIS)

    Dvorsek, T.; Cizelj, L.

    1995-01-01

    Outside diameter stress corrosion cracking at the tube to tube support plate intersections is assessed in the paper. The impact of defect specific maintenance on steam generator operation safety and reliability was investigated. This was performed by comparing efficiencies of defect specific and traditional maintenance strategy. The efficiency was studied through expected primary-to-secondary leak rate and tube rupture probability in a case of postulated accidental operating conditions, and number of tubes which shall be plugged using both maintenance strategies. In general, the efficiency of specific maintenance is function of particular steam generator and operating cycle. (author)

  9. Maintenance service for major component of PWR plant. Replacement of pressurizer safe end weld

    International Nuclear Information System (INIS)

    Miyoshi, Yoshiyuki; Kobayashi, Yuki; Yamamoto, Kazuhide; Ueda, Takeshi; Suda, Naoki; Shintani, Takashi

    2017-01-01

    In October 2016, MHI completed the replacement of safe end weld of pressurizer (Pz) of Ringhals unit 3, which was the first maintenance work for main component of pressurized water reactor (PWR) plant in Europe. For higher reliability and longer lifetime of PWR plant, MHI has conducted many kinds of maintenance works of main components of PWR plants in Japan against stress corrosion cracking due to aging degradation. Technical process for replacement of Pz safe end weld were established by MHI. MHI has experienced the work for 21 PWR units in Japan. That of Ringhals unit 3 was planned and conducted based on the experiences. In this work, Alloy 600 used for welds of nozzles of Pz was replaced with Alloy 690. Alloy 690 is more corrosive-resistant than Alloy 600. Specially designed equipment and technical process were developed and established by MHI to replace safe end weld of Pz and applied for the Ringhals unit 3 as a first application in Europe. The application had been performed in success and achieved the planned replacement work duration and total radiation dose by using sophisticated machining and welding equipment designed to meet the requirements to be small, lightweight and remote-controlled and operating by well skilled MHI personnel experienced in maintenance activities for major components of PWR plant in Japan. The success shows that the experience, activities and technology developed in Japan for main components of PWR plant shall be applicable to contribute reliable operations of nuclear power plants in Europe and other countries. (author)

  10. Advantages of condition-based maintenance approach

    International Nuclear Information System (INIS)

    Bareiss, J.; Roos, E.; Jovanovic, A.; Perunicic, M.; Balos, D.

    2004-01-01

    Pilot applications in EnBW steam boiler components and high-pressure pipe systems in the context of the European research project RIMAP (''Risk Based Inspection and Maintenance Procedures for European Industry'') showed that application of a risk-based maintenance strategy (e.g. RIMAP) will make the decision process more transparent and enable better condition-oriented maintenance. With regard to life management of the systems (availability, product quality), this appears to be more important than than the aspect of cost reduction in the maintenance sector, although the latter may not be unwelcome. (orig.) [de

  11. Preventive maintenance plan of the air-conditioning duct using the ACM-sensor

    International Nuclear Information System (INIS)

    Fukuba, Kazushi; Ito, Takanobu; Kojima, Akiko; Tanji, Kazuhiro; Sato, Yuki

    2013-01-01

    Air-conditioning duct is difficult to predict the date to occur of corrosion such as affect the function. Therefore, the current conservation method is mostly corrective maintenance. Therefore, we used the test pieces of six types and ACM-sensor in order to solve the corrosion speed from corrosion environment and relationship of corrosion quantity of test pieces. In addition, was used the duct molded articles various in order to check the corrosion degree of when processed the duct. As a result, we were selected crust body constituting a duct and optimal combination of the flange by solve the corrosion speed of the test pieces various. Thus, it performs preventive disposal before to occur of corrosion such as affect the function by predicting the duct life from corrosion speed, and lead to stability and safe operating by appropriate maintenance of equipment. (author)

  12. A proactive condition-based maintenance strategy with both perfect and imperfect maintenance actions

    International Nuclear Information System (INIS)

    Do, Phuc; Voisin, Alexandre; Levrat, Eric; Iung, Benoit

    2015-01-01

    This paper deals with a proactive condition-based maintenance (CBM) considering both perfect and imperfect maintenance actions for a deteriorating system. Perfect maintenance actions restore completely the system to the ‘as good as new’ state. Their related cost are however often high. The first objective of the paper is to investigate the impacts of imperfect maintenance actions. In fact, both positive and negative impacts are considered. Positive impact means that the imperfect maintenance cost is usually low. Negative impact implies that (i) the imperfect maintenance restores a system to a state between good-as-new and bad-as-old and (ii) each imperfect preventive action may accelerate the speed of the system's deterioration process. The second objective of the paper is to propose an adaptive maintenance policy which can help to select optimally maintenance actions (perfect or imperfect actions), if needed, at each inspection time. Moreover, the time interval between two successive inspection points is determined according to a remaining useful life (RUL) based-inspection policy. To illustrate the use of the proposed maintenance policy, a numerical example finally is introduced. - Highlights: • A new imperfect maintenance model for deterioration system is proposed. • Both positive and negative impacts of an imperfect maintenance action are investigated. • An adaptive condition-based maintenance policy is introduced. • The optimal number of useful imperfect maintenance actions for each life cycle is optimally provided

  13. A durability model incorporating safe life methodology and damage tolerance approach to assess first inspection and maintenance period for structures

    International Nuclear Information System (INIS)

    Xiong, J.J.; Shenoi, R.A.

    2009-01-01

    This paper outlines a new durability model to assess the first inspection and maintenance period for structures. Practical scatter factor formulae are presented to determine the safe fatigue crack initiation and propagation lives from the results of a single full-scale test of a complete structure. New theoretical solutions are proposed to determine the s a -s m -N surfaces of fatigue crack initiation and propagation. Prediction techniques are then developed to establish the relationship equation between safe fatigue crack initiation and propagation lives with a specific reliability level using a two-stage fatigue damage cumulative rule. A new durability model incorporating safe life and damage tolerance design approaches is derived to assess the first inspection and maintenance period. Finally, the proposed models are applied to assess the first inspection and maintenance period of a fastening structure at the root of helicopter blade.

  14. A durability model incorporating safe life methodology and damage tolerance approach to assess first inspection and maintenance period for structures

    Energy Technology Data Exchange (ETDEWEB)

    Xiong, J.J. [Aircraft Department, Beihang University, Beijing 100083 (China); Shenoi, R.A. [School of Engineering Sciences, University of Southampton, Southampton SO17 1BJ (United Kingdom)], E-mail: r.a.shenoi@ship.soton.ac.uk

    2009-08-15

    This paper outlines a new durability model to assess the first inspection and maintenance period for structures. Practical scatter factor formulae are presented to determine the safe fatigue crack initiation and propagation lives from the results of a single full-scale test of a complete structure. New theoretical solutions are proposed to determine the s{sub a}-s{sub m}-N surfaces of fatigue crack initiation and propagation. Prediction techniques are then developed to establish the relationship equation between safe fatigue crack initiation and propagation lives with a specific reliability level using a two-stage fatigue damage cumulative rule. A new durability model incorporating safe life and damage tolerance design approaches is derived to assess the first inspection and maintenance period. Finally, the proposed models are applied to assess the first inspection and maintenance period of a fastening structure at the root of helicopter blade.

  15. Application of condition based maintenance to nuclear power plants

    International Nuclear Information System (INIS)

    Sonoda, Yukio; Nakano, Tomohito; Shimizu, Shunichi; Iida, Jun; Atomura, Masakazu; Abe, Masahiro

    2002-01-01

    Device Karte management system which supports application of condition based maintenance to nuclear power plants has been developed. The purpose of this system is to support maintenance personnel in device inspection scheduling based on operating condition monitoring and maintenance histories. There are four functions: field database, degradation estimation, inspection time decision and maintenance planning. The authors have been applying this system to dozens of devices of Onagawa Nuclear Power Station Unit No. 1 for one year. This paper represents the system concept and its application experiences. (author)

  16. Guidelines for safe process operations and maintenance

    CERN Document Server

    2010-01-01

    First-line managers have to maintain the integrity of facilities, control manufacturing processes, and handle unusual or emergency situations, as well as respond to the pressures of production demand. On a daily basis, they are closest to the operating personnel who may be injured by a process accident, and they are in the best position to spot problem conditions and to act to contain them. This book offers these managers ""how-to"" information on process safety management program execution in the operations and maintenance departments, recommending technical and administrative process safety

  17. Maintenance cost avoidance through comprehensive condition monitoring

    International Nuclear Information System (INIS)

    Miller, G.P.; McClymonds, S.L.

    1990-01-01

    Condition monitoring, the measurement and trending of a critical parameter for predictive maintenance, has reached new levels of acceptance and application within the utility and manufacturing industry. Commercially available systems extend well beyond traditional vibration-monitoring systems to include such areas as online wear, crack and leak detection, and stress monitoring. The challenge facing industry is to integrate the information generated from condition monitoring. Current studies indicate that the effectiveness of predictive maintenance depends much more on the program that is established to apply the monitoring techniques than on the monitoring equipment itself. This paper presents a five-phase approach to developing a condition monitoring program

  18. Establishment, maintenance, and re-establishment of the safe and efficient steady-following state

    International Nuclear Information System (INIS)

    Pan Deng; Zheng Ying-Ping

    2015-01-01

    We present an integrated mathematical model of vehicle-following control for the establishment, maintenance, and re-establishment of the previous or new safe and efficient steady-following state. The hyperbolic functions are introduced to establish the corresponding mathematical models, which can describe the behavioral adjustment of the following vehicle steered by a well-experienced driver under complex vehicle following situations. According to the proposed mathematical models, the control laws of the following vehicle adjusting its own behavior can be calculated for its moving in safety, efficiency, and smoothness (comfort). Simulation results show that the safe and efficient steady-following state can be well established, maintained, and re-established by its own smooth (comfortable) behavioral adjustment with the synchronous control of the following vehicle’s velocity, acceleration, and the actual following distance. (paper)

  19. On condition based maintenance policy

    Directory of Open Access Journals (Sweden)

    Jong-Ho Shin

    2015-04-01

    Full Text Available In the case of a high-valuable asset, the Operation and Maintenance (O&M phase requires heavy charges and more efforts than the installation (construction phase, because it has long usage life and any accident of an asset during this period causes catastrophic damage to an industry. Recently, with the advent of emerging Information Communication Technologies (ICTs, we can get the visibility of asset status information during its usage period. It gives us new challenging issues for improving the efficiency of asset operations. One issue is to implement the Condition-Based Maintenance (CBM approach that makes a diagnosis of the asset status based on wire or wireless monitored data, predicts the assets abnormality, and executes suitable maintenance actions such as repair and replacement before serious problems happen. In this study, we have addressed several aspects of CBM approach: definition, related international standards, procedure, and techniques with the introduction of some relevant case studies that we have carried out.

  20. Maintenance and environmental qualification

    International Nuclear Information System (INIS)

    Martin, R.S.; Austin, D.G.

    1995-01-01

    The design of today's nuclear generating plants involves many detailed design considerations. This includes comprehensive look at aging effects on plant components over their expected lifetimes. This is important to ensuring that the plant operates safely throughout its life. The effects of aging are required to be documented in detail in today's designs. This documentation provides assurance that safe operating conditions are maintained throughout the station life cycle. This requirement is analogous to the longer standing requirement to ensure pressure boundary integrity. The pressure boundary integrity requirement has existed in the industry since its inception. The subject of plant aging effects and the maintenance of functionality is known as Environmental Qualification (EQ). This paper will attempt to explain the wisdom of EQ and the potential for optimizing maintenance activities (to move from reactive to proactive activities), within the context of the overall maintenance program. It is the author's intent to encourage the active involvement of maintenance professionals in the effective implementation of the ongoing EQ program so that the benefits are maximized

  1. Discounted cost model for condition-based maintenance optimization

    International Nuclear Information System (INIS)

    Weide, J.A.M. van der; Pandey, M.D.; Noortwijk, J.M. van

    2010-01-01

    This paper presents methods to evaluate the reliability and optimize the maintenance of engineering systems that are damaged by shocks or transients arriving randomly in time and overall degradation is modeled as a cumulative stochastic point process. The paper presents a conceptually clear and comprehensive derivation of formulas for computing the discounted cost associated with a maintenance policy combining both condition-based and age-based criteria for preventive maintenance. The proposed discounted cost model provides a more realistic basis for optimizing the maintenance policies than those based on the asymptotic, non-discounted cost rate criterion.

  2. The use of condition monitoring information for maintenance planning and decision-making

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K.; Rosqvist, T. [VTT Industrial Systems (Finland); Paulsen, J.L. [Risoe National Lab., Roskilde (Denmark)

    2002-12-01

    A survey is presented outlining the use of condition monitoring information in three Nordic nuclear power plants. The questions of the survey relate to the role of condition monitoring in strategic, as well as operative, maintenance planning and decision-making. The survey indicates that condition monitoring is increasingly implemented at nuclear power plants, but very selectively and in a rather slow pace for predictive maintenance. A combined strategy of condition based maintenance and predetermined preventive maintenance is applied for important equipment such as main circulation pumps and steam turbines. A realistic aim is to reduce the number of costly or error prone maintenance and disassembling inspection activities by condition monitoring given that the approach enables a good diagnosis and prediction. Systematic follow-up and analysis of such condition monitoring information followed by a case-specific planning and decision making of timely and rightly directed maintenance actions can justify an extension of the intervals of a number of predetermined inspection, maintenance or periodic testing tasks. (au)

  3. A basic condition-based maintenance strategy for air-cooled turbine generators

    International Nuclear Information System (INIS)

    Laird, T.; Griffith, G.; Hoof, M.

    2005-01-01

    This paper discusses the methods of using condition-based maintenance (CBM) for turbine generators. Even though it is focused on the maintenance strategy for air-cooled generators, all types of power producers can realize benefits from a better maintenance strategy at lower costs. A reliable assessment of the actual unit condition requires detailed knowledge of the unit design, operational weaknesses, cost of maintenance and operational capabilities. (author)

  4. Clustering condition-based maintenance for a multi-unit system with aperiodic inspections

    NARCIS (Netherlands)

    Olde Keizer, Minou C.A.; Teunter, Ruud H.; Podofillini, Luca; Sudret, Bruno; Stojadinović, Božidar; Zio, Enrico; Kröger, Wolfgang

    2015-01-01

    Condition-Based Maintenance (CBM) is a predictive maintenance strategy, which bases the maintenance scheduling on condition measurements of the components. In this paper, we continue work on the CBM optimization approach proposed by Castanier, B., A. Grall & C. Bérenguer (2005). A condition-based

  5. National Athletic Trainers' Association position statement: safe weight loss and maintenance practices in sport and exercise.

    Science.gov (United States)

    Turocy, Paula Sammarone; DePalma, Bernard F; Horswill, Craig A; Laquale, Kathleen M; Martin, Thomas J; Perry, Arlette C; Somova, Marla J; Utter, Alan C

    2011-01-01

    To present athletic trainers with recommendations for safe weight loss and weight maintenance practices for athletes and active clients and to provide athletes, clients, coaches, and parents with safe guidelines that will allow athletes and clients to achieve and maintain weight and body composition goals. Unsafe weight management practices can compromise athletic performance and negatively affect health. Athletes and clients often attempt to lose weight by not eating, limiting caloric or specific nutrients from the diet, engaging in pathogenic weight control behaviors, and restricting fluids. These people often respond to pressures of the sport or activity, coaches, peers, or parents by adopting negative body images and unsafe practices to maintain an ideal body composition for the activity. We provide athletic trainers with recommendations for safe weight loss and weight maintenance in sport and exercise. Although safe weight gain is also a concern for athletic trainers and their athletes and clients, that topic is outside the scope of this position statement. Athletic trainers are often the source of nutrition information for athletes and clients; therefore, they must have knowledge of proper nutrition, weight management practices, and methods to change body composition. Body composition assessments should be done in the most scientifically appropriate manner possible. Reasonable and individualized weight and body composition goals should be identified by appropriately trained health care personnel (eg, athletic trainers, registered dietitians, physicians). In keeping with the American Dietetics Association (ADA) preferred nomenclature, this document uses the terms registered dietitian or dietician when referring to a food and nutrition expert who has met the academic and professional requirements specified by the ADA's Commission on Accreditation for Dietetics Education. In some cases, a registered nutritionist may have equivalent credentials and be the

  6. Graphite core stability during 'care and maintenance' and 'safe storage'

    International Nuclear Information System (INIS)

    Wickham, A.J.; Marsden, B.J.; Sellers, R.M.; Pilkington, N.J.

    1998-01-01

    The current decommissioning strategy for the graphite-moderated reactors operated by Magnox Electric plc, Nuclear Electric Ltd and Scottish Nuclear Ltd is to delay dismantling and to initiate a monitored period of care and maintenance followed by a period of safe storage totaling up to 135 years. This philosophy has the considerable advantage of permitting the majority of radionuclides to decay, thereby minimising personnel dose during dismantling which itself will require far less complex remote-handling equipment. It also defers the disposal of the graphite and other components so that the provision of a deep land-based repository can be achieved. A comprehensive review of all relevant data on the chemical, physical and mechanical properties of the graphite and its potential reactions, including radioactivity transport, has been undertaken in order to demonstrate that there are no potential mechanisms which might lead to degradation of the core during the storage period. It is concluded that no significant experimental work is necessary to support the safe storage philosophy although, since the ingress of rainwater over long periods of time cannot be assumed incredible, a number of anomalies in chemical leaching rates may be worthy of re-examination. No other potential chemical reactions, such as the radiolytic formation of nitric acid leading to corrosion problems, are considered significant. (author)

  7. Integrated reliability condition monitoring and maintenance of equipment

    CERN Document Server

    Osarenren, John

    2015-01-01

    Consider a Viable and Cost-Effective Platform for the Industries of the Future (IOF) Benefit from improved safety, performance, and product deliveries to your customers. Achieve a higher rate of equipment availability, performance, product quality, and reliability. Integrated Reliability: Condition Monitoring and Maintenance of Equipment incorporates reliable engineering and mathematical modeling to help you move toward sustainable development in reliability condition monitoring and maintenance. This text introduces a cost-effective integrated reliability growth monitor, integrated reliability degradation monitor, technological inheritance coefficient sensors, and a maintenance tool that supplies real-time information for predicting and preventing potential failures of manufacturing processes and equipment. The author highlights five key elements that are essential to any improvement program: improving overall equipment and part effectiveness, quality, and reliability; improving process performance with maint...

  8. State of technology, system and solution supporting on-line maintenance - company's activities and products

    International Nuclear Information System (INIS)

    Nishitani, Junichi; Shimizu, Shunichi; Higasa, Hisakazu

    2010-01-01

    The new inspection system based on operator's maintenance and monitoring program of nuclear power plants was introduced in Japan more than one year ago and recommended on-line maintenance (maintenance during operation) will be carried out to increase capacity factor with safe and reliable operation of the plant. In this feature article, nine experts described the state of technology, system and solution supporting on-line maintenance - company's activities and products. These were titled as 'MHI's technology supporting on-line maintenance'. 'Technology supporting on-line maintenance - Toshiba's activities to upgrade monitoring and diagnostic service and maintenance management', 'AsahiKASEI's activities of on-line maintenance', 'Importance of information sharing of on-line maintenance and its ideal method-function of impact plan of IBM Maximo Asset Management for Nuclear', 'US's on-line maintenance and information systems', 'SmartProcedures realizing safe operation of nuclear power plant - proposal of computerized procedures', 'Ultrasonic leak detection system SDT170', 'Application of infrared thermography for equipment maintenance in nuclear power plant' and 'On-line condition monitoring system - condition eye'. (T. Tanaka)

  9. Regulatory requirements related to maintenance and compliance monitoring

    International Nuclear Information System (INIS)

    Ling, A.K.H.

    1997-01-01

    The maintenance related regulatory requirements are identified in the regulatory documents and licence conditions. Licensee complies with these requirements by operating the nuclear power plant within the safe operating envelope as given in the operating policies and principles and do maintenance according to approved procedures and/or work plans. Safety systems are regularly tested. AECB project officers review and check to ensure that the licensee operates the nuclear power plant in accordance with the regulatory requirements and licence conditions. (author). 6 tabs

  10. Condition monitoring a key component in the preventive maintenance

    International Nuclear Information System (INIS)

    Isar, C.

    2006-01-01

    The preventive maintenance programs are necessary to ensure that nuclear safety significant equipment will function when it is supposed to. Diesel generator, pumps, motor operated valves and air operated control valves are typically operated every three months. When you drive a car, you depend on lot of sounds, the feel of the steering wheel and gauges to determine if the car is running correctly. Similarly with operating equipment for a power plant - sounds or vibration of the equipment or the gauges and test equipment indicate a problem or degradation, actions are taken to correct the deficiency. Due to safety and economical reason diagnostic and monitoring systems are of growing interest in all complex industrial production. Diagnostic systems are requested to detect, diagnose and localize faulty operating conditions at an early stage in order to prevent severe failures and to enable predictive and condition oriented maintenance. In this context it is a need for using various on-line and off-line condition monitoring and diagnostics, non-destructive inspection techniques and surveillance. The condition monitoring technique used in nuclear power plant Cernavoda are presented in this paper. The selection of components and parameters to be monitored, monitoring and diagnostics techniques used are incorporated into a preventive maintenance program. Modern measurement technique in combination with advanced computerized data processing and acquisition show new ways in the field of machine surveillance. The diagnostic capabilities of predictive maintenance technologies have increased recently year with advances made in sensor technologies. The paper will focus on the following condition monitoring technique: - oil analysis - acoustic leakage monitoring - thermography - valve diagnostics: motor operated valve, air operated valve and check valve - motor current signature - vibration monitoring and rotating machine monitoring and diagnostics For each condition monitoring

  11. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M; Anderson, D P [Spectro Incorporated, Littleton, Massachusetts (United States)

    1998-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  12. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M.; Anderson, D.P. [Spectro Incorporated, Littleton, Massachusetts (United States)

    1997-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  13. Development of electromagnetic induction diagnostics technology for condition based maintenance

    International Nuclear Information System (INIS)

    Mawatari, Shingo; Oeda, Kaoru; Yatogi, Hideo; Fukuchi, Taira; Ueno, Tadashi

    2008-01-01

    In ROKKASHO Reprocessing Plant (below, called 'RRP'), we have applied Condition Based Maintenance to rotating equipment with vibration diagnostics technology. However, a few rotating equipment are difficult to diagnose definitely, because have structural problems which exercise vibrational noise to peripheral and be impossible to install vibratory sensor. Electromagnetic induction diagnostics technology which measure magnetic fields to eddy current which is induced to rotary through static magnetic field, diagnose deterioration behavior such as abrasion and crack. As a result, it has possibilities to clear above problems. Therefore, we started our basic researches with this technology for Condition Based Maintenance. In this paper, it introduces basic data about 'Non-seal pump' that have installed in RRP. As a result, this technology is a possibility that be able to detect Condition Based Maintenance. (author)

  14. Open system architecture for condition based maintenance applied to a hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Amaya, E.J.; Alvares, A.J. [University of Brasilia (UnB), DF (Brazil). Mechanical and Mechatronic Dept.], Emails: eamaya@unb.br, alvares@AlvaresTech.com; Gudwin, R.R. [State University of Campinas (UNICAMP), SP (Brazil). Computer Engineering and Industrial Automation Dept.], E-mail: gudwin@dca.fee.unicamp.br

    2009-07-01

    The hydroelectric power plant of Balbina is implementing a condition based maintenance system applying an open, modular and scalable integrated architecture to provide comprehensive solutions and support to the end users like operational and maintenance team. The system called SIMPREBAL (Predictive Maintenance System of Balbina) is advocate of open standards, in particular through collaborative research programmers. In the developing is clearly understands the need for both, industry standards and a simple to use software development tool chain, supporting the development of complex condition based maintenance systems with multiple partners. The Open System Architecture for Condition Based Maintenance (OSA-CBM) is a standard that consider seven hierarchic layers that represent a logic transition or performed data flow from the data acquisition layer, through the intermediates layers as signal processing, condition monitor, health assessment, prognostics and decision support, to arrive to the presentation layer. SIMPREBAL is being implementing as an OSA-CBM software framework and tool set that allows the creation of truly integrated, comprehensive maintenance solutions through the internet. This paper identifies specific benefits of the application of the OSA-CBM in comprehensive solutions of condition based maintenance for a hydroelectric power plant. (author)

  15. A condition-based maintenance policy for stochastically deteriorating systems

    International Nuclear Information System (INIS)

    Grall, A.; Berenguer, C.; Dieulle, L.

    2002-01-01

    We focus on the analytical modeling of a condition-based inspection/replacement policy for a stochastically and continuously deteriorating single-unit system. We consider both the replacement threshold and the inspection schedule as decision variables for this maintenance problem and we propose to implement the maintenance policy using a multi-level control-limit rule. In order to assess the performance of the proposed maintenance policy and to minimize the long run expected maintenance cost per unit time, a mathematical model for the maintained system cost is derived, supported by the existence of a stationary law for the maintained system state. Numerical experiments illustrate the performance of the proposed policy and confirm that the maintenance cost rate on an infinite horizon can be minimized by a joint optimization of the maintenance structure thresholds, or equivalently by a joint optimization of a system replacement threshold and the aperiodic inspection schedule

  16. Optimal condition-based maintenance decisions for systems with dependent stochastic degradation of components

    International Nuclear Information System (INIS)

    Hong, H.P.; Zhou, W.; Zhang, S.; Ye, W.

    2014-01-01

    Components in engineered systems are subjected to stochastic deterioration due to the operating environmental conditions, and the uncertainty in material properties. The components need to be inspected and possibly replaced based on preventive or failure replacement criteria to provide the intended and safe operation of the system. In the present study, we investigate the influence of dependent stochastic degradation of multiple components on the optimal maintenance decisions. We use copula to model the dependent stochastic degradation of components, and formulate the optimal decision problem based on the minimum expected cost rule and the stochastic dominance rules. The latter is used to cope with decision maker's risk attitude. We illustrate the developed probabilistic analysis approach and the influence of the dependency of the stochastic degradation on the preferred decisions through numerical examples

  17. Statistical Learning Framework with Adaptive Retraining for Condition-Based Maintenance

    International Nuclear Information System (INIS)

    An, Sang Ha; Chang, Soon Heung; Heo, Gyun Young; Seo, Ho Joon; Kim, Su Young

    2009-01-01

    As systems become more complex and more critical in our daily lives, the need for the maintenance based on the reliable monitoring and diagnosis has become more apparent. However, in reality, the general opinion has been that 'maintenance is a necessary evil' or 'nothing can be done to improve maintenance costs'. Perhaps these were true statements twenty years ago when many of the diagnostic technologies were not fully developed. The developments of microprocessor or computer based instrumentation that can be used to monitor the operating condition of plant equipment, machinery and systems have provided the means to manage the maintenance operation. They have provided the means to reduce or eliminate unnecessary repairs, prevent catastrophic machine failures and reduce the negative impact of the maintenance operation on the profitability of manufacturing and production plants. Condition-based maintenance (CBM) techniques help determine the condition of in-service equipment in order to predict when maintenance should be performed. Most of the statistical learning techniques are only valid as long as the physics of a system does not change. If any significant change such as the replacement of a component or equipment occurs in the system, the statistical learning model should be re-trained or re-developed to adapt the new system. In this research, authors will propose a statistical learning framework which can be applicable for various CBMs, and the concept of the adaptive retraining technique will be described to support the execution of the framework so that the monitoring system does not need to be re-developed or re-trained even though there are any significant changes in the system or component

  18. A condition-based maintenance policy for multi-component systems with a high maintenance setup cost

    NARCIS (Netherlands)

    Zhu, Q.; Peng, H.; Houtum, van G.J.J.A.N.

    2015-01-01

    Condition-based maintenance (CBM) is becoming increasingly important due to the development of advanced sensor and information technology, which facilitates the remote collection of condition data. We propose a new CBM policy for multi-component systems with continuous stochastic deteriorations. To

  19. Knowledge Management for Large Scale Condition Based Maintenance

    Data.gov (United States)

    National Aeronautics and Space Administration — This presentation will review the use of knowledge management in the development and support of Condition Based Maintenance (CBM) systems for complex systems with...

  20. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  1. An Intelligent Fleet Condition-Based Maintenance Decision Making Method Based on Multi-Agent

    OpenAIRE

    Bo Sun; Qiang Feng; Songjie Li

    2012-01-01

    According to the demand for condition-based maintenance online decision making among a mission oriented fleet, an intelligent maintenance decision making method based on Multi-agent and heuristic rules is proposed. The process of condition-based maintenance within an aircraft fleet (each containing one or more Line Replaceable Modules) based on multiple maintenance thresholds is analyzed. Then the process is abstracted into a Multi-Agent Model, a 2-layer model structure containing host negoti...

  2. Sustainable resilience in property maintenance: encountering changing weather conditions

    DEFF Research Database (Denmark)

    Cox, Rimante Andrasiunaite; Nielsen, Susanne Balslev

    2014-01-01

    Purpose: The purpose of the study is to develop a methodological approach for project management to integrate sustainability and resilience planning in property maintenance as an incremental strategy for upgrading existing properties to meet new standards for sustainable and climate resilient...... buildings. Background: Current maintenance practice is focused on the technical standard of buildings, with little consideration of sustainability and resilience. There is a need to develop tools for incorporating sustainable resilience into maintenance planning. Approach: The study is primarily theoretical......, developing the concept of sustainable resilience for changing weather conditions Results: The paper suggests a decision support methodology that quantifies sustainable resilience for the analytical stages of property maintenance planning. Practical Implications: The methodology is generic and expected users...

  3. A condition-based maintenance policy for multi-component systems with a high maintenance setup cost

    NARCIS (Netherlands)

    Zhu, Q.; Peng, H.; Houtum, van G.J.J.A.N.

    2012-01-01

    Condition-based maintenance (CBM) is becoming increasingly important due to the development of advanced sensor and ICT technology, so that the condition data can be collected remotely. We propose a new CBM policy for multi-component systems with continuous stochastic deteriorations. To reduce the

  4. Improvement of railway ballast maintenance approach, incorporating ballast geometry and fouling conditions

    Science.gov (United States)

    Sadeghi, J.; Motieyan-Najar, M. E.; Zakeri, J. A.; Yousefi, B.; Mollazadeh, M.

    2018-04-01

    Ballast plays an important role in the stability of railway track systems. The effectiveness of the ballast in maintaining the track stability is very much dependent on its mechanical conditions. The available ballast maintenance approaches are mainly based on only track geometry conditions (such as track profile) which do not sufficiently reflect the ballast mechanical behaviors. That is, the ballast potential of degradation (i.e., ballast long term behaviors) has been omitted. This makes the effectiveness of the current ballast maintenance approach questionable, indicating a need for a more comprehensive and effective ballast conditions assessment technique. In response to this need, two ballast condition indices based on ballast geometry degradation (BGI) and the level of ballast fouling (BFI) as the main indicators of ballast mechanical behavior were developed. The BGI is a function of the standard deviations of track alignment, unevenness and twist. The BFI was developed based on the data obtained from the ground penetration radar (GPR). Making use of the new indices, a more reliable maintenance algorithm was developed. Through illustrations of the applicability of the new maintenance algorithm in a railway line, it was shown that the new algorithm causes a considerable improvement in the maintenance effectiveness and an increase in the life cycle of railway tracks by making more effective allocation of resources and more accurate maintenance planning.

  5. Tools to support maintenance strategies under soft soil conditions

    Directory of Open Access Journals (Sweden)

    J. W. M. Lambert

    2015-11-01

    Full Text Available Costs for maintenance of infrastructure in municipalities with soft soil underground conditions, are estimated to be almost 40 % higher than in others. As a result, these municipalities meet financial problems that cause overdue maintenance. In some cases municipalities are even afraid to be unable to offer a minimum service level in future. In common, traditional practice, roads and sewerage systems have been constructed in trenches that consist of sandy material that replaces the upper meters of the soft soil. Under influence of its weight, this causes accelerated settlements of the construction. A number of alternative constructions have been developed, e.g. using light-weight materials to limit settlement velocity. In order to limit future maintenance costs, improvement of maintenance strategies is desired. Tools have been and will be developed to support municipalities in improving their maintenance strategies and save money by doing that. A model (BALANS that weighs the attractiveness of alternative solutions under different soil, environmental and economic circumstances, will be presented.

  6. Cognitive Artificial Intelligence Method for Interpreting Transformer Condition Based on Maintenance Data

    Directory of Open Access Journals (Sweden)

    Karel Octavianus Bachri

    2017-07-01

    Full Text Available A3S(Arwin-Adang-Aciek-Sembiring is a method of information fusion at a single observation and OMA3S(Observation Multi-time A3S is a method of information fusion for time-series data. This paper proposes OMA3S-based Cognitive Artificial-Intelligence method for interpreting Transformer Condition, which is calculated based on maintenance data from Indonesia National Electric Company (PLN. First, the proposed method is tested using the previously published data, and then followed by implementation on maintenance data. Maintenance data are fused to obtain part condition, and part conditions are fused to obtain transformer condition. Result shows proposed method is valid for DGA fault identification with the average accuracy of 91.1%. The proposed method not only can interpret the major fault, it can also identify the minor fault occurring along with the major fault, allowing early warning feature. Result also shows part conditions can be interpreted using information fusion on maintenance data, and the transformer condition can be interpreted using information fusion on part conditions. The future works on this research is to gather more data, to elaborate more factors to be fused, and to design a cognitive processor that can be used to implement this concept of intelligent instrumentation.

  7. Improving regulatory oversight of maintenance programs

    International Nuclear Information System (INIS)

    Cook, S.

    2008-01-01

    Safe nuclear power plant operation requires that risks due to failure or unavailability of Structures, Systems and Components (SSCs) be minimized. Implementation of an effective maintenance program is a key means for achieving this goal. In its regulatory framework, the important relationship between maintenance and safety is acknowledged by the CNSC. A high level maintenance program requirement is included in the Class I Facilities Regulations. In addition, the operating licence contains a condition based on the principle that the design function and performance of SSCs needs to remain consistent with the plant's design and analysis documents. Nuclear power plant licensees have the primary responsibility for safe operation of their facilities and consequently for implementation of a successful maintenance program. The oversight role of the Canadian Nuclear Safety Commission (CNSC) is to ensure that the licensee carries out that responsibility. The challenge for the CNSC is how to do this consistently and efficiently. Three opportunities for improvement to regulatory maintenance oversight are being pursued. These are related to the regulatory framework, compliance verification inspection activities and monitoring of self-reporting. The regulatory framework has been improved by clarifying expectations through the issuance of S-210 'Maintenance Programs for Nuclear Power Plants'. Inspection activities have been improved by introducing new maintenance inspections into the baseline program. Monitoring is being improved by making better use of self-reported and industry produced maintenance related performance indicators. As with any type of program change, the challenge is to ensure the consistent and optimal application of regulatory activities and resources. This paper is a summary of the CNSC's approach to improving its maintenance oversight strategy. (author)

  8. Tribological diagnostics as a precondition for maintenance

    International Nuclear Information System (INIS)

    Jolevski, Tome

    1999-01-01

    The concept of maintenance in one industrial system usually represents a sum of constructions and rules that point out to several facts: 1) over which technical system the maintenance should be applied, 2) when it should be applied and 3) on which way it should be organized. In our real industrial systems the contemporary maintenance of the technical systems is not enough. Also, other contemporary measures whose basic task is to prevent unplanned stoppages as well as damages in the production process are insufficient. The equipment of the technical systems with devices for permanent monitoring of the condition, in other words with devices for technical diagnostic is unsatisfactorily, with a small exemption of the devices for vibration diagnostic monitoring of the condition in real time. The tribological diagnostics, using the procedures and methods without destroying as well as measuring and monitoring the condition of the lubrication devices, allows to find out the real status of the technical systems in operation. On that basic it is possible to undertake correct maintenance measures which would provide promising and safe operation of the technical systems. (Author)

  9. Preventive maintenance technology for nuclear power stations

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo

    1992-01-01

    With the increase of the number of nuclear power plants in operation and the number of years of operation, the improvement of reliability and the continuation of safe operation have become more important, and the expectation for preventive maintenance technology has also heightened. The maintenance of Japanese nuclear power plants is based on the time schedule maintenance mainly by the regular inspection carried out every year, but the monitoring of the conditions of various machinery and equipment in operation has been performed widely. In this report, the present state of checkup and inspection technologies and the monitoring and diagnostic technologies for operational condition, which are the key technologies of preventive maintenance, are described. As the checkup and inspection technologies, ultrasonic flow detection technology, phased array technology, Amplituden und Laufzeit Orts Kurven method and X-ray CT, and as the monitoring and diagnostic technologies for operational condition, the diagnosis support system for BWR plants 'PLADIS', those for rotary machines, those for turbogenerators, those for solenoid valves, the mechanization of patrol works and the systematizing technology are reported. (K.I.)

  10. A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem

    DEFF Research Database (Denmark)

    Rahmati, Seyed Habib A.; Ahmadi, Abbas; Govindan, Kannan

    2018-01-01

    the level of the system optimization. By means of this equipment, managers can benefit from a condition-based maintenance (CBM) for monitoring and managing their system. The chief aim of the paper is to develop a stochastic maintenance problem based on CBM activities engaged with a complex applied......Integrated consideration of production planning and maintenance processes is a real world assumption. Specifically, by improving the monitoring equipment such as various sensors or product-embedded information devices in recent years, joint assessment of these processes is inevitable for enhancing...... production problem called flexible job shop scheduling problem (FJSP). This integrated problem considers two maintenance scenarios in terms of corrective maintenance (CM) and preventive maintenance (PM). The activation of scenario is done by monitoring the degradation condition of the system and comparing...

  11. New maintenance strategy of Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant for effective ageing management and safe long-term operation

    International Nuclear Information System (INIS)

    Inagaki, Takeyuki; Yamashita, Norimichi

    2009-01-01

    Fukushima Dai-ichi Nuclear Power Plant is the oldest among three nuclear power plants owned and operated by Tokyo Electric Power Company, which consists of six boiling water reactor units. The commercial operation of Unit 1 was commenced in 1971 (37 years old) and Unit 6 in 1978 (29 years old). Currently ageing degradations of systems, structures and components are managed through maintenance programs, component replacement/refurbishment programs and long-term maintenance plans. The long-term maintenance plans are established through ageing management component replacement/refurbishment programs reviews performed before the 30th year of operation and they are for safe and reliable operation after 30 years (long-term operation). However the past maintenance actions and past component replacement/refurbishment programs were not always proactive and past operational experience and maintenance practices suggest that effective/proactive ageing management programs be introduced in earlier stage of the plant operation. In this circumstance, Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant are setting up a new maintenance strategy that includes 1) improving the normal maintenance programs by using ageing degradation data, 2) effective use of information on internal/external operational experience and maintenance practices related to ageing, and 3) proactive component/equipment refurbishment programs during a refreshment outage for safe and reliable long-term operation. To accomplish the goal of this strategy, strengthening engineering capability of plant staff members is a crucial required for the plant. The objective of this paper is to briefly explain main results ageing management reviews, past and current significant ageing issues and management programs against them, and the new maintenance strategy established by Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant. (author)

  12. An Intelligent Fleet Condition-Based Maintenance Decision Making Method Based on Multi-Agent

    Directory of Open Access Journals (Sweden)

    Bo Sun

    2012-01-01

    Full Text Available According to the demand for condition-based maintenance online decision making among a mission oriented fleet, an intelligent maintenance decision making method based on Multi-agent and heuristic rules is proposed. The process of condition-based maintenance within an aircraft fleet (each containing one or more Line Replaceable Modules based on multiple maintenance thresholds is analyzed. Then the process is abstracted into a Multi-Agent Model, a 2-layer model structure containing host negotiation and independent negotiation is established, and the heuristic rules applied to global and local maintenance decision making is proposed. Based on Contract Net Protocol and the heuristic rules, the maintenance decision making algorithm is put forward. Finally, a fleet consisting of 10 aircrafts on a 3-wave continuous mission is illustrated to verify this method. Simulation results indicate that this method can improve the availability of the fleet, meet mission demands, rationalize the utilization of support resources and provide support for online maintenance decision making among a mission oriented fleet.

  13. Availability analysis of mechanical systems with condition-based maintenance using semi-Markov and evaluation of optimal condition monitoring interval

    Science.gov (United States)

    Kumar, Girish; Jain, Vipul; Gandhi, O. P.

    2018-03-01

    Maintenance helps to extend equipment life by improving its condition and avoiding catastrophic failures. Appropriate model or mechanism is, thus, needed to quantify system availability vis-a-vis a given maintenance strategy, which will assist in decision-making for optimal utilization of maintenance resources. This paper deals with semi-Markov process (SMP) modeling for steady state availability analysis of mechanical systems that follow condition-based maintenance (CBM) and evaluation of optimal condition monitoring interval. The developed SMP model is solved using two-stage analytical approach for steady-state availability analysis of the system. Also, CBM interval is decided for maximizing system availability using Genetic Algorithm approach. The main contribution of the paper is in the form of a predictive tool for system availability that will help in deciding the optimum CBM policy. The proposed methodology is demonstrated for a centrifugal pump.

  14. Predictive maintenance technology development at G.A. Siwabessy multipurpose reactor

    Energy Technology Data Exchange (ETDEWEB)

    Jupiter Sitorus Pane; Imron, M.; Sapto Hartoko; Sentot Alibasya Harahap [Multipurpose Research Reactor G.A. Siwabessy, National Nuclear Energy Agency (Indonesia)

    1999-10-01

    Safe operation of reactor is certainly influenced by condition of system and component equipped to the reactor's system. In order to maintain the condition of that systems and components, RSG-GAS has arranged maintenance program with time-basis. All 6 (six) groups of reactor systems are maintained within interval of weekly, monthly, three monthly, six-monthly, yearly, five-yearly appropriately. The experience showed that event though the maintenance was performed persistently, the condition of system and component are still not able to determine exactly. The possibility of accidental failure is open since the failure factor are varied and complicated. In order to limit an uncertainty of the component condition a based maintenance shall be introduced. An infrared investigation and manual vibration analysis had been used to diagnose the condition of some RSG-GAS' components. In addition, other alternative technology for predictive maintenance was developed. It is started by computerizing the database maintenance and doing historical review for its aging management, and developing data acquisition and processing equipment using Lab View computer program for collecting and processing signal data from dynamics system. This paper describes briefly the status of those development results. (author)

  15. Predictive maintenance technology development at G.A. Siwabessy multipurpose reactor

    International Nuclear Information System (INIS)

    Jupiter Sitorus Pane; Imron, M.; Sapto Hartoko; Sentot Alibasya Harahap

    1999-01-01

    Safe operation of reactor is certainly influenced by condition of system and component equipped to the reactor's system. In order to maintain the condition of that systems and components, RSG-GAS has arranged maintenance program with time-basis. All 6 (six) groups of reactor systems are maintained within interval of weekly, monthly, three monthly, six-monthly, yearly, five-yearly appropriately. The experience showed that event though the maintenance was performed persistently, the condition of system and component are still not able to determine exactly. The possibility of accidental failure is open since the failure factor are varied and complicated. In order to limit an uncertainty of the component condition a based maintenance shall be introduced. An infrared investigation and manual vibration analysis had been used to diagnose the condition of some RSG-GAS' components. In addition, other alternative technology for predictive maintenance was developed. It is started by computerizing the database maintenance and doing historical review for its aging management, and developing data acquisition and processing equipment using Lab View computer program for collecting and processing signal data from dynamics system. This paper describes briefly the status of those development results. (author)

  16. Analysis of the possibility of applying a condition-based maintenance model on an example of tank weapons

    Directory of Open Access Journals (Sweden)

    Igor J. Epler

    2013-12-01

    Full Text Available For any modern army it is very important to continuously maintain a high degree of operational (combat readiness (availability in order to maximize the effectiveness of the use of technical systems. Since determination and prediction of technical states and failures of technical systems in engineering, especially in armament, are difficult due to the impossibility of continuous condition monitoring with appropriate measuring equipment there is a need for a maintenance model that would be most helpful in taking timely action maintenance. In this paper, the subject of research is a model of maintenance of the M-84 tank  weapoons systems.   IntroductionThe M-84 tank is one of the most promising technical systems in the Serbian Army. Its use and modifications are foreseen in the next ten years. The  M-84 is characterized by good tactical and technical characteristics. It has a powerful 125 mm cannon, coupled 7.62 mm machine gun and 12.7 mm anti-aircraft machine gun. The M-84 tank has an automatic battery charger and a fire control system. The fire control system enables fast target tracking and stabilization of the cannon barrel, which is a prerequisite for timely and favorable effect on the target. There are certain ambiguities in the existing model of maintenance of tank weapons.   Technical diagnostics Technical diagnostics, as a part of the process of condition-based maintenance, should determine technical conditions of components or technical systems with certain accuracy at a point in time.   Maintenance strategy A maintenance strategy can be defined as a variant of a maintenance system determined by a concept, organization and character of maintenance procedures, as well as the relationship between the various levels at which maintenance is performed. It is defined for technical system parts, individual technical systems and for system maintenance as a whole. The basic maintenance strategies implemented today are: -      corrective

  17. GRAPHICAL MODELS OF THE AIRCRAFT MAINTENANCE PROCESS

    Directory of Open Access Journals (Sweden)

    Stanislav Vladimirovich Daletskiy

    2017-01-01

    Full Text Available The aircraft maintenance is realized by a rapid sequence of maintenance organizational and technical states, its re- search and analysis are carried out by statistical methods. The maintenance process concludes aircraft technical states con- nected with the objective patterns of technical qualities changes of the aircraft as a maintenance object and organizational states which determine the subjective organization and planning process of aircraft using. The objective maintenance pro- cess is realized in Maintenance and Repair System which does not include maintenance organization and planning and is a set of related elements: aircraft, Maintenance and Repair measures, executors and documentation that sets rules of their interaction for maintaining of the aircraft reliability and readiness for flight. The aircraft organizational and technical states are considered, their characteristics and heuristic estimates of connection in knots and arcs of graphs and of aircraft organi- zational states during regular maintenance and at technical state failure are given. It is shown that in real conditions of air- craft maintenance, planned aircraft technical state control and maintenance control through it, is only defined by Mainte- nance and Repair conditions at a given Maintenance and Repair type and form structures, and correspondingly by setting principles of Maintenance and Repair work types to the execution, due to maintenance, by aircraft and all its units mainte- nance and reconstruction strategies. The realization of planned Maintenance and Repair process determines the one of the constant maintenance component. The proposed graphical models allow to reveal quantitative correlations between graph knots to improve maintenance processes by statistical research methods, what reduces manning, timetable and expenses for providing safe civil aviation aircraft maintenance.

  18. Control-limit preventive maintenance policies for components subject to imperfect preventive maintenance and variable operational conditions

    International Nuclear Information System (INIS)

    You Mingyi; Li Hongguang; Meng Guang

    2011-01-01

    This paper develops two component-level control-limit preventive maintenance (PM) policies for systems subject to the joint effect of partial recovery PM acts (imperfect PM acts) and variable operational conditions, and investigates the properties of the proposed policies. The extended proportional hazards model (EPHM) is used to model the system failure likelihood influenced by both factors. Several numerical experiments are conducted for policy property analysis, using real lifetime and operational condition data and typical characterization of imperfect PM acts and maintenance durations. The experimental results demonstrate the necessity of considering both factors when they do exist, characterize the joint effect of the two factors on the performance of an optimized PM policy, and explore the influence of the loading sequence of time-varying operational conditions on the performance of an optimized PM policy. The proposed policies extend the applicability of PM optimization techniques.

  19. Are green building features safe for preventive maintenance workers? Examining the evidence.

    Science.gov (United States)

    Omar, Mohamed Shamun; Quinn, Margaret M; Buchholz, Bryan; Geiser, Ken

    2013-04-01

    Many newly constructed green buildings (GB) are certified using the United States Green Building Council (USGBC) Leadership in Energy and Environmental Design (LEED) rating system for new construction and major renovation which focuses on architectural and mechanical design to conserve energy, reduce environmental harm, and enhance indoor quality for occupants. This study evaluated the preventive maintenance (PM) worker occupational safety and health (OSH) risks related to the design of GB. PM job hazard analyses (JHA) were performed on the tasks required to operate and maintain five GB features selected from 13 LEED certified GB. A 22-item JHA and OSH risk scoring system were developed. Potentially serious OSH hazards included: green roofs made of slippery material without fall protection; energy recovery wheels and storm water harvesting systems in confined spaces; skylights without guard rails; and tight geothermal well mechanical rooms constraining safe preventive practices. GB can present PM OSH risks and these should be eliminated in the building design phase. Copyright © 2013 Wiley Periodicals, Inc.

  20. Residual life management. Maintenance improvement

    International Nuclear Information System (INIS)

    Sainero Garcia, J.; Hevia Ruperez, F.

    1995-01-01

    The terms Residual Life Management, Life Cycle Management and Long-Term Management are synonymous with a concept which aims to establish efficient maintenance for the profitable and safe operation of a power plant for as long as possible. A Residual Life Management programme comprises a number of stages, of which Maintenance Evaluation focuses on how power plant maintenance practices allow the mitigation and control of component ageing. with this objective in mind, a methodology has been developed for the analysis of potential degradative phenomena acting on critical components in terms of normal power plant maintenance practices. This methodology applied to maintenance evaluation enables the setting out of a maintenance programme based on the Life Management concept, and the programme's subsequent up-dating to allow for new techniques and methods. Initial applications have shown that although, in general terms, power plant maintenance is efficient, the way in which Residual Life Management is approached requires changes in maintenance practices. These changes range from modifications to existing inspection and surveillance methods or the establishment of new ones, to the monitoring of trends or the performance of additional studies, the purpose of which is to provide an accurate evaluation of the condition of the installations and the possibility of life extension. (Author)

  1. Joint optimization of condition-based maintenance and production lot-sizing

    NARCIS (Netherlands)

    Peng, H.; van Houtum, G.J.J.A.N.

    2016-01-01

    Due to the development of sensor technologies nowadays, condition-based maintenance (CBM) programs can be established and optimized based on the data collected through condition monitoring. The CBM activities can significantly increase the uptime of a machine. However, they should be conducted in a

  2. A review on condition-based maintenance optimization models for stochastically deteriorating system

    International Nuclear Information System (INIS)

    Alaswad, Suzan; Xiang, Yisha

    2017-01-01

    Condition-based maintenance (CBM) is a maintenance strategy that collects and assesses real-time information, and recommends maintenance decisions based on the current condition of the system. In recent decades, research on CBM has been rapidly growing due to the rapid development of computer-based monitoring technologies. Research studies have proven that CBM, if planned properly, can be effective in improving equipment reliability at reduced costs. This paper presents a review of CBM literature with emphasis on mathematical modeling and optimization approaches. We focus this review on important aspects of the CBM, such as optimization criteria, inspection frequency, maintenance degree, solution methodology, etc. Since the modeling choice for the stochastic deterioration process greatly influences CBM strategy decisions, this review classifies the literature on CBM models based on the underlying deterioration processes, namely discrete- and continuous-state deterioration, and proportional hazard model. CBM models for multi-unit systems are also reviewed in this paper. This paper provides useful references for CBM management professionals and researchers working on CBM modeling and optimization. - Highlights: • A review on Condition-based maintenance (CBM) optimization models is presented. • The CBM models are classified based on the underlying deterioration processes. • Existing CBM models for both single- and multi-unit systems are reviewed. • Future essential research directions on CBM are identified.

  3. Heuristic hybrid game approach for fleet condition-based maintenance planning

    International Nuclear Information System (INIS)

    Feng, Qiang; Bi, Xiong; Zhao, Xiujie; Chen, Yiran; Sun, Bo

    2017-01-01

    The condition-based maintenance (CBM) method is commonly used to select appropriate maintenance opportunities according to equipment status over a period of time. The CBM of aircraft fleets is a fleet maintenance planning problem. In this problem, mission requirements, resource constraints, and aircraft statuses are considered to find an optimal strategy set. Given that the maintenance strategies for each aircraft are finite, fleet CBM can be treated as a combinatorial optimization problem. In this study, the process of making a decision on the CBM of military fleets is analyzed. The fleet CBM problem is treated as a two-stage dynamic decision-making problem. Aircraft are divided into dispatch and standby sets; thus, the problem scale is significantly reduced. A heuristic hybrid game (HHG) approach comprising a competition game and a cooperative game is proposed on the basis of heuristic rule. In the dispatch set, a competition game approach is proposed to search for a local optimal strategy matrix. A cooperative game method for the two sets is also proposed to ensure global optimization. Finally, a case study regarding a fleet comprising 20 aircraft is conducted, with the results proving that the approach efficiently generates outcomes that meet the mission risk-oriented schedule requirement. - Highlights: • A new heuristic hybrid game method for fleet condition-based maintenance is proposed. • The problem is simplified by hierarchical solving based on dispatch and standby set. • The local optimal solution is got by competition game algorithm for dispatch set. • The global optimal solution is got by cooperative game algorithm between two sets.

  4. Corrosion Sensor Development for Condition-Based Maintenance of Aircraft

    Directory of Open Access Journals (Sweden)

    Gino Rinaldi

    2012-01-01

    Full Text Available Aircraft routinely operate in atmospheric environments that, over time, will impact their structural integrity. Material protection and selection schemes notwithstanding, recurrent exposure to chlorides, pollution, temperature gradients, and moisture provide the necessary electrochemical conditions for the development and profusion of corrosion in aircraft structures. For aircraft operators, this becomes an important safety matter as corrosion found in a given aircraft must be assumed to be present in all of that type of aircraft. This safety protocol and its associated unscheduled maintenance requirement drive up the operational costs of the fleet and limit the availability of the aircraft. Hence, there is an opportunity at present for developing novel sensing technologies and schemes to aid in shifting time-based maintenance schedules towards condition-based maintenance procedures. In this work, part of the ongoing development of a multiparameter integrated corrosion sensor is presented. It consists of carbon nanotube/polyaniline polymer sensors and commercial-off-the-shelf sensors. It is being developed primarily for monitoring environmental and material factors for the purpose of providing a means to more accurately assess the structural integrity of aerospace aluminium alloys through fusion of multiparameter sensor data. Preliminary experimental test results are presented for chloride ion concentration, hydrogen gas evolution, humidity variations, and material degradation.

  5. The machines maintenance conditions assessment in the plastic industry

    Directory of Open Access Journals (Sweden)

    Stanisław Borkowski

    2015-12-01

    Full Text Available The purpose, methodology, main findings, the originality of the subject area (research, way of using. The main research analysis purpose is a presentation, an assessment and an interpretation of the research findings on the machines maintenance conditions in the plastic industry. The research analysis was carried out with applying Technology ABC method and TPM coefficients calculations connected with Techno pak machine components maintenance. The research was carried out in the chosen manufacturing enterprise of the plastic industry. Research findings interpretation results have been introduced in the analyzed enterprise in the form of the manufacturing processes improvement.

  6. BALTICA IV. Plant maintenance for managing life and performance

    Energy Technology Data Exchange (ETDEWEB)

    Hietanen, S; Auerkari, P [eds.; VTT Manufacturing Technology, Espoo (Finland). Operational Reliability

    1999-12-31

    BALTICA IV International Conference on Plant Maintenance Managing Life and performance held on September 7-9, 1998 on board M/S Silja Symphony on its cruise between Helsinki-Stockholm and at Aavaranta in Kirkkonummi. The BALTICA IV conference provides a forum for the transfer of technology from applied research to practice. This is one of the two volumes of the proceedings of the BALTICA IV International Conference on Plant Maintenance Managing Life and Performance. The BALTICA IV conference focuses on new technology, recent experience and applications of condition and life management, and on improvements in maintenance strategies for safe and economical operation of power plants. (orig.)

  7. BALTICA IV. Plant maintenance for managing life and performance

    Energy Technology Data Exchange (ETDEWEB)

    Hietanen, S.; Auerkari, P. [eds.] [VTT Manufacturing Technology, Espoo (Finland). Operational Reliability

    1998-12-31

    BALTICA IV International Conference on Plant Maintenance Managing Life and performance held on September 7-9, 1998 on board M/S Silja Symphony on its cruise between Helsinki-Stockholm and at Aavaranta in Kirkkonummi. The BALTICA IV conference provides a forum for the transfer of technology from applied research to practice. This is one of the two volumes of the proceedings of the BALTICA IV International Conference on Plant Maintenance Managing Life and Performance. The BALTICA IV conference focuses on new technology, recent experience and applications of condition and life management, and on improvements in maintenance strategies for safe and economical operation of power plants. (orig.)

  8. Questions of the clinical estimation of bronchopulmonary system status of the personnel which will participate in works on transformation 'Shelter object' in radioecologically safe condition

    International Nuclear Information System (INIS)

    Sushko, V.A.; Shvajko, L.I.

    2002-01-01

    The given data indicate that for victims of the ChNPP accident (primarily clean-up workers) presence of bronchological pathology in the form of chronic obstructive pulmonary disease with some special clinical, endoscopes, pathomorphological and immunological features appeared typical. That requires the adequate methodology elaboration of diagnostics and treatment of bronchopulmonary diseases for the given contingent. Thus, the personnel directed on works, connected with transformation 'Shelter Object' (ShO) in radioecologically safe condition should have complex pulmonological maintenance at all stages of medicosanitary support

  9. The role of knowledge sharing and transactive memory system on condition based maintenance policy

    NARCIS (Netherlands)

    Koochaki, J.; Bouwhuis, I. M.

    2008-01-01

    Today, Condition Based Maintenance (CBM) has reached a sophisticated level in industry and the advantages of predictive maintenance are accepted globally. However, although lots of effort has been put into improving methods and techniques in CBM, most of predictive maintenance programs fail to

  10. Condition monitoring and maintenance of nuclear power plant concrete structures

    International Nuclear Information System (INIS)

    Orr, R.; Prasad, N.

    1988-01-01

    Nuclear power plant concrete structures are potentially subject to deterioration due to several environmental conditions, including weather exposure, ground water exposure, and sustained high temperature and radiation levels. The nuclear power plant are generally licensed for a term of 40 years. In order to maximize the return from the existing plants, feasibility studies are in progress for continued operation of many of these plants beyond the original licensed life span. This paper describes a study that was performed with an objective to define appropriate condition monitoring and maintenance procedures. A timely implementation of a condition monitoring and maintenance program would provide a valuable database and would provide justification for extension of the plant's design life. The study included concrete structures such as the containment buildings, interior structures, basemats, intake structures and cooling towers. Age-related deterioration at several operating power plants was surveyed and the potential degradation mechanisms have been identified

  11. Age-dependent reliability model considering effects of maintenance and working conditions

    International Nuclear Information System (INIS)

    Martorell, Sebastian; Sanchez, Ana; Serradell, Vicente

    1999-01-01

    Nowadays, there is some doubt about building new nuclear power plants (NPPs). Instead, there is a growing interest in analyzing the possibility to extend current NPP operation, where life management programs play an important role. The evolution of the NPP safety depends on the evolution of the reliability of its safety components, which, in turn, is a function of their age along the NPP operational life. In this paper, a new age-dependent reliability model is presented, which includes parameters related to surveillance and maintenance effectiveness and working conditions of the equipment, both environmental and operational. This model may be used to support NPP life management and life extension programs, by improving or optimizing surveillance and maintenance tasks using risk and cost models based on such an age-dependent reliability model. The results of the sensitivity study in the example application show that the selection of the most appropriate maintenance strategy would directly depend on the previous parameters. Then, very important differences are expected to appear under certain circumstances, particularly, in comparison with other models that do not consider maintenance effectiveness and working conditions simultaneously

  12. Overview of maintenance principles and regulatory supervision of maintenance activities at nuclear power plants in Slovakia

    International Nuclear Information System (INIS)

    Rohar, S.; Cepcek, S.

    1997-01-01

    The maintenance represents one of the most important tools to ensure safe and reliable operation of nuclear power plants. The emphasis of Nuclear Regulatory Authority of the Slovak Republic to the maintenance issue is expressed by requirements in the regulations. The current practice of maintenance management in operated nuclear power plants in Slovak Republic is presented. Main aspects of maintenance, as maintenance programme, organization of maintenance, responsibilities for maintenance are described. Activities of nuclear regulatory authority in maintenance process are presented too. (author)

  13. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  14. Influencing factors for condition-based maintenance in railway tracks using knowledge-based approach

    NARCIS (Netherlands)

    Jamshidi, A.; Hajizadeh, S.; Naeimi, M.; Nunez Vicencio, Alfredo; Li, Z.

    2017-01-01

    In this paper, we present a condition-based maintenance decision method using
    knowledge-based approach for rail surface defects. A railway track may contain a considerable number of surface defects which influence track maintenance decisions. The proposed method is based on two sets of

  15. Earnings with Condition Based Maintenance; Ganhos com manutencao preditiva baseada em dados de processo em tempo real

    Energy Technology Data Exchange (ETDEWEB)

    Barabas, Elizabeth [Softbrasil Automacao, Sao Paulo, SP (Brazil)

    2008-07-01

    Keeping active in perfect functioning is essential for any company. Today, the maintenance has been performed in most of the stops for maintenance. In a modern industrial environment, where the systems provide data and process information in real time, it is possible bring the performance of the plant to a optimized level, through the maintenance based on condition of equipment. This work described the earnings with CBM (Condition Based Maintenance)

  16. Maintenance of radiation protection at a drawing board stage of the "Shelter" Object transformation into environmentally safe system.

    Science.gov (United States)

    Nechaev, S Yu

    2015-12-01

    Special aspects of radiation protection maintenance at a drawing board stage of the "Shelter" Object transforma tion into environmentally safe system are shaped in the article. Information is provided on the basis of analysis of design plans and specifications both with project paperwork from activities at the ShO in 2002 2015 on accordance to requirements of the Ukrainian health legislation in the field of radiation hygiene regulations. Specific features of radiation factors at the ShO were identified accounting their emergency origination. Relevancy of assessment of a range of activity types and technologies impact on radiation situation in the operation environment was reviewed and substantiated. General characteristics of radiation exposure and resulting doses in personnel under the activi ty execution are provided followed by the requirements to estimates of anticipated radiation doses. Features and peculiarities of application of the Ukrainian health legislation in a field of radiation hygienic regulations are reviewed in a view of meeting the requirements of NRBU 97, NRBU 97/D 2000, OSPU 2005, SPORO 85, SP AES 88 and other health legislative regulatory documents under conditions of work at the ShO. By the virtue of analysis of radi ation hygienic factors at the ShO the special aspects of choice of individual and collective radiological protection arrangements for personnel were identified, namely the individual protective gear and respiratory protection equip ment, shielding, decontamination, dust suppression, ventilation, sanitary pass control, sanitary barriers, scope and types of radiological control, setting the design levels of radiological environment parameters, criteria for the most safe options (technologies) of work execution. S. Yu. Nechaev.

  17. A condition-based maintenance policy for multi-component systems with Lévy copulas dependence

    International Nuclear Information System (INIS)

    Li, Heping; Deloux, Estelle; Dieulle, Laurence

    2016-01-01

    In this paper, we propose a new condition-based maintenance policy for multi-component systems taking into account stochastic and economic dependences. The stochastic dependence between components due to common environment is modelled by Lévy copulas. Its influence on the maintenance optimization is investigated with different dependence degrees. On the issue of economic dependence providing opportunities to group maintenance activities, a new maintenance decision rule is proposed which permits maintenance grouping. In order to evaluate the performance of the proposed maintenance policy, we compare it to the classical maintenance policies. - Highlights: • A new adaptive maintenance policy for grouping maintenance actions is proposed. • The impacts of both economic and stochastic dependences are investigated. • The performance of the proposed maintenance policy is evaluated under different system configurations. • The stochastic dependence is modelled by Lévy copulas. • The proposed maintenance decision rule can take full advantage of economic and stochastic dependences.

  18. Plant and equipment division laboratory services series: a ten-year building-maintenance cost history

    International Nuclear Information System (INIS)

    Keesee, H.F.

    1976-09-01

    Maintaining a multifacility national laboratory in a safe, reliable condition is a complex management responsibility in terms of budgets, costs, and proper utilization of personnel and material resources. Increasing wage rates and material costs, combined with decreased budgets and aging facilities, create unusual challenges to maintenance managers. A ten-year history of building-maintenance costs, a brief description of the maintenance program, analyses of personnel requirements, cost increase indexes, unit costs, cost controls, procedures, and a brief discussion of alterations and improvements are presented

  19. Ageing model considering effects of maintenance and working conditions

    International Nuclear Information System (INIS)

    Martorell, S.; Sanchez, A.; Serradell, V.

    1998-01-01

    Nowadays, there is some doubt about building new Nuclear Power Plants (NPPs). Instead, there is a growing interest in analyzing the possibility to extend current NPP operation where life management programs play an important role. The evolution of the NPP safety depends on the evolution of the reliability of its safety components as a function of their age along the NPP operational life. In this paper, a new age-dependent reliability model is presented, which includes parameters related to surveillance and maintenance effectiveness and working conditions, both environmental and operational, of the equipment. This model may be used to support NPP life management and life extension programs by improving or optimizing surveillance and maintenance tasks using risk and cost models based on such an age-dependent reliability model. The results of the sensitivity study in the application show that the selection of the most appropriate maintenance strategy would directly depend on the previous parameters and very important differences are expected to appear under certain circumstance. (Author) 7 refs

  20. Reliability and risk-based planning of operation and maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Florian, Mihai; Berzonskis, Arvydas

    2016-01-01

    costly (and safe), and it is important to include in the reliability assessment the information obtained during operation (from condition monitoring and inspections) and the maintenance performed (incl. repairs and replacements). The paper presents a risk-based approach for optimal planning of Operation...

  1. A Real-Time Quantitative Condition Alerting and Analysis Support System for Aircraft Maintenance, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Financial constraints and the need for improved operational efficiency are requiring airlines to emphasize "on-condition" maintenance over scheduled maintenance...

  2. An open-source automated continuous condition-based maintenance platform for commercial buildings

    Energy Technology Data Exchange (ETDEWEB)

    Katipamula, Srinivas; Gowri, Krishnan; Hernandez, George

    2016-09-09

    This paper describes one such reference process that can be deployed to provide continuous automated conditioned-based maintenance management for buildings that have BIM, a building automation system (BAS) and a computerized maintenance management software (CMMS) systems. The process can be deployed using an open source transactional network platform, VOLTTRON™, designed for distributed sensing and controls and supports both energy efficiency and grid services.

  3. Seismic-safe conditions of blasting near pressure pipe-lines during power installation construction

    International Nuclear Information System (INIS)

    Smolij, N.I.; Nikitin, A.S.

    1980-01-01

    Seismic-safe conditions for performing drill-blasting operations in the vicinity of underground gas pipelines when constructing thermal- or nuclear power plants are discussed. It is shown that, for the determination of seismic-safe parameters, of drill-blasting operations, the maximum permissible level of seismic loads should be specified taking into account the mechanical properties of the pipeline.metal, structural parameters of the gas pipeline and the pressure of the medium transported. Besides, the seismic effect of the blast should be considered with regard to particular conditions of blasting and rock properties. The equations and diagrams used in the calculation are given

  4. A Condition Based Maintenance Approach to Forecasting B-1 Aircraft Parts

    Science.gov (United States)

    2017-03-23

    Air Force Institute of Technology AFIT Scholar Theses and Dissertations 3-23-2017 A Condition Based Maintenance Approach to Forecasting B-1 Aircraft...component’s life history where reliability forecasts could be stipulated based on a component’s current condition . One of the major issues their report noted...Engine Condition Monitoring System Specification. Contract Number DOT-CG-80513-A. Grand Prairie, TX. Air Force Materiel Command. (2011) Requirements For

  5. Some problems of maintenance regulation at Ukrainian nuclear power plants

    International Nuclear Information System (INIS)

    Koltakov, V.

    1997-01-01

    Among all the possible problems arising in a connection with provision of NPP power units safe operation, the maintenance and repair at the Ukrainian NPPs possess an important place. System of maintenance and repair at the Ukrainian NPPs is presently still traditional one, based on the former USSR' document ''Rules of the NPPs Equipment Maintenance and Repair Arrangement'' (RD.53.025.002-088). For to provide technical systems reliability and safety in an accordance with ''General Provisions on NPP Safety'' (OPB-82) (presently OPB-95 is in underway in Ukraine) nuclear operators are implementing their maintenance and repair. These procedures are obligatory conditions for NPP operation during all the life term. To implement an equipment maintenance and repair there are appropriate divisions in NPP structure envisaged such as departments, laboratories, sections, shops, etc. composing an NPP maintenance and repair service. There are also another specific enterprises engaged in such activities. (author). 2 tabs, 4 diagrams

  6. Conditions of job performance quality during nuclear reactor maintenance

    International Nuclear Information System (INIS)

    Babos, K.; Takacs, J.

    1991-01-01

    The education and training programs of the maintenance personnel at the Paks Nuclear Power Plant, Hungary are described. In addition to well trained personnel, the conditions of job quality involves the preparation of job by proper check lists and availability of documentation, and the inspection and checking of the accomplishment of job tasks. Such an inspection procedure is proposed. (R.P.) 2 figs

  7. Single-stage Kanban system with deterioration failures and condition-based preventive maintenance

    International Nuclear Information System (INIS)

    Xanthopoulos, A.S.; Koulouriotis, D.E.; Botsaris, P.N.

    2015-01-01

    Despite the fact that the fields of pull type production control policies and condition-based preventive maintenance have much in common contextually, they have evolved independently up to now. In this investigation, an attempt is made to bridge the gap between these two branches of knowledge by introducing the single-stage Kanban system with deterioration failures and condition-based preventive maintenance. The formalism of continuous time Markov chains is used to model the system and expressions for eight performance metrics are derived. Two important, from a managerial perspective, constrained optimization problems for the proposed model are defined where the objective is the simultaneous optimization of the Kanban policy, the preventive maintenance policy and the inspection schedule under conflicting performance criteria. Multiple instances of each optimization problem are solved by means of the augmented Lagrangian genetic algorithm. The results from the optimization trials coupled by the results from extensive numerical examples facilitate the thorough investigation of the system’s behaviour. - Highlights: • Kanban system with deterioration failures and preventive maintenance is introduced. • The system is modeled as a continuous time Markov chain. • Expressions for eight performance metrics are derived. • The behavior of the system is studied through numerical examples. • Optimization results for selected performance metrics are presented

  8. The Road Pavement Condition Index (PCI Evaluation and Maintenance: A Case Study of Yemen

    Directory of Open Access Journals (Sweden)

    Karim Fareed M. A.

    2016-12-01

    Full Text Available The pavement condition index (PCI is a simple, convenient and inexpensive way to monitor the condition of the surface of roads, identify maintenance and rehabilitation (M-and-R needs as well as ensure that road maintenance budgets are spent wisely. In this research, the pavement condition was evaluated in terms of the surface distresses existing at the time of the field evaluation. The PCI procedure was used in this research because it deals with the subject of pavement distress identification most comprehensively and is based on a sound statistical technique of pavement sampling.

  9. ETHEL's systems and facilities for safe management of tritiated wastes

    International Nuclear Information System (INIS)

    Mannone, F.; Dworschak, H.; Vassallo, G.

    1992-01-01

    The European Tritium Handling Experimental Laboratory (ETHEL) is a new tritium facility at the Commission of the European Community's Joint Research Centre, Ispra Site. The laboratory, destined to handle multigram amounts of tritium for safety related R and D purposes, is foreseen to start radioactive operations in late 1992. The general operation and maintenance of laboratory systems and future experiments will generate tritiated wastes in gaseous, liquid and solid forms. The management of such wastes under safe working conditions is a stringent laboratory requirement aimed at minimizing the risk of unacceptable tritium exposures to workers and the general public. This paper describes the main systems and facilities installed in ETHEL for the safe management of tritiated wastes

  10. Maintenance Planning of Offshore Wind Turbine using Condition Monitoring Information

    DEFF Research Database (Denmark)

    Ramírez, José G. Rangel; Sørensen, John Dalsgaard

    2009-01-01

    Deterioration processes such as fatigue and corrosion are typically affecting offshore structures. To "control" this deterioration, inspection and maintenance activities are developed. Probabilistic methodologies represent an important tool to identify the suitable strategy to inspect and control...... the deterioration in structures such as offshore wind turbines (OWT). Besides these methods, the integration of condition monitoring information (CMI) can optimize the mitigation activities as an updating tool. In this paper, a framework for risk-based inspection and maintenance planning (RBI) is applied for OWT....... With the integration of CMI by means Bayesian inference, a slightly change of first inspection times are coming up, influenced by the reduction of the uncertainty and harsher or milder external agents....

  11. A decision-making framework to integrate maintenance contract conditions with critical spares management

    International Nuclear Information System (INIS)

    Godoy, David R.; Pascual, Rodrigo; Knights, Peter

    2014-01-01

    Maintenance outsourcing is a strategic driver for asset intensive industries pursuing to enhance supply chain performance. Spare parts management plays a relevant role in this premise since its significant impact on equipment availability, and hence on business success. Designing critical spares policies might therefore seriously affect maintenance contracts profitability, yet service receivers and external providers traditionally attempt to benefit separately. To coordinate both chain parties, we investigated whether the spare components pool should be managed in-house or contracted out. This paper provides a decision-making framework to efficiently integrate contractual conditions with critical spares stockholding. Using an imperfect maintenance strategy over a finite horizon, the scheme maximizes chain returns whilst evaluating the impact of an additional part to stock. As result, an original joint value – preventive interval and stock level – sets the optimal agreement to profitably allocate the components pool within the service contract. Subsidization bonuses on preventive interventions and pooling costs are also estimated to induce the service provider to adjust its policy when needed. The proposed contractual conditions motivate stakeholders to continuously improve maintenance performance and supply practices, thus obtaining higher joint benefits

  12. Review on the Pavement-repairing Measures as a Condition for the Choice of Road-Maintenance Strategy

    Directory of Open Access Journals (Sweden)

    Nedevska Ivana

    2017-01-01

    Full Text Available The road-maintenance strategies vary from one country to another, and even between the road management authorities within a one single country. It is not surprising, as there is not best maintenance method, nor a universal set of strategies that can be applied equally everywhere. Generally, there are strategies acceptable in certain conditions, but the factors influencing the selection process are diverse and very complex. This paper will present a review of the various measures that can be applied on the roads, which is certainly the basic condition of selection of an appropriate maintenance strategy.

  13. A model for determining condition-based maintenance policies for deteriorating multi-component systems

    NARCIS (Netherlands)

    Hontelez, J.A.M.; Wijnmalen, D.J.D.

    1993-01-01

    We discuss a method to determine strategies for preventive maintenance of systems consisting of gradually deteriorating components. A model has been developed to compute not only the range of conditions inducing a repair action, but also inspection moments based on the last known condition value so

  14. Prognostics and Condition-Based Maintenance: A New Approach to Precursive Metrics

    International Nuclear Information System (INIS)

    Jarrell, Donald B.; Sisk, Daniel R.; Bond, Leonard J.

    2004-01-01

    The assumptions used in the design basis of process equipment have always been as much art as science. The usually imprecise boundaries of the equipments' operational envelope provide opportunities for two major improvements in the operations and maintenance (O and M) of process machinery: (a) the actual versus intended machine environment can be understood and brought into much better alignment and (b) the end goal can define O and M strategies in terms of life cycle and economic management of plant assets.Scientists at the Pacific Northwest National Laboratory (PNNL) have performed experiments aimed at understanding and controlling aging of both safety-specific nuclear plant components and the infrastructure that supports essential plant processes. In this paper we examine the development of aging precursor metrics and their correlation with degradation rate and projected machinery failure.Degradation-specific correlations have been developed at PNNL that will allow accurate physics-based diagnostic and prognostic determinations to be derived from a new view of condition-based maintenance. This view, founded in root cause analysis, is focused on quantifying the primary stressor(s) responsible for degradation in the component of interest and formulating a deterministic relationship between the stressor intensity and the resulting degradation rate. This precursive relationship between the performance, degradation, and underlying stressor set is used to gain a first-principles approach to prognostic determinations. A holistic infrastructure approach, as applied through a conditions-based maintenance framework, will allow intelligent, automated diagnostic and prognostic programming to provide O and M practitioners with an understanding of the condition of their machinery today and an assurance of its operational state tomorrow

  15. Structural health monitoring methodology for aircraft condition-based maintenance

    Science.gov (United States)

    Saniger, Jordi; Reithler, Livier; Guedra-Degeorges, Didier; Takeda, Nobuo; Dupuis, Jean Pierre

    2001-06-01

    Reducing maintenance costs while keeping a constant level of safety is a major issue for Air Forces and airlines. The long term perspective is to implement condition based maintenance to guarantee a constant safety level while decreasing maintenance costs. On this purpose, the development of a generalized Structural Health Monitoring System (SHMS) is needed. The objective of such a system is to localize the damages and to assess their severity, with enough accuracy to allow low cost corrective actions. The present paper describes a SHMS based on acoustic emission technology. This choice was driven by its reliability and wide use in the aerospace industry. The described SHMS uses a new learning methodology which relies on the generation of artificial acoustic emission events on the structure and an acoustic emission sensor network. The calibrated acoustic emission events picked up by the sensors constitute the knowledge set that the system relies on. With this methodology, the anisotropy of composite structures is taken into account, thus avoiding the major cause of errors of classical localization methods. Moreover, it is adaptive to different structures as it does not rely on any particular model but on measured data. The acquired data is processed and the event's location and corrected amplitude are computed. The methodology has been demonstrated and experimental tests on elementary samples presented a degree of accuracy of 1cm.

  16. Safe operation and maintenance of research reactor

    International Nuclear Information System (INIS)

    Munsorn, S.

    1999-01-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U 3 O 8 - Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  17. Safe operation and maintenance of research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Munsorn, S. [Reactor Operation Division, Office of Atomic Energy for Peace, Chatuchak, Bangkok (Thailand)

    1999-10-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U{sub 3}O{sub 8}- Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  18. Condition Based Maintenance of Space Exploration Vehicles Using Structural Health Monitoring, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Acellent Technologies proposes to develop an autonomous and automated diagnostic system for condition based maintenance (CBM) of safety critical structures for space...

  19. Basic Concept and Theoretical Study of Condition-based Maintenance for Power Transmission System

    Institute of Scientific and Technical Information of China (English)

    LIMing; HAN Xueshan; YANG Ming; GUO Zhihong

    2011-01-01

    The appropriate maintenance time for the single equipment can be found easily and efficiently under the background of condition-based maintenance. However, from the perspective of the whole power system, discrepancy between equipment individual and the whole power system would appear. Once this discrepancy can not be coordinated, it will certainly cause contradiction and conflict between individual equipment and the whole system, and lose the integral efficiency. To solve this contradiction and conflicts is of significant meaning.

  20. A New Hybrid Approach for Augmented Reality Maintenance in Scientific Facilities

    Directory of Open Access Journals (Sweden)

    Héctor Martínez

    2013-09-01

    Full Text Available Maintenance in scientific facilities is a difficult issue, especially in large and hazardous facilities, due to the complexity of tasks and equipment. Augmented reality is a technology that has already shown great promise in the maintenance field. With the help of augmented reality applications, maintenance tasks can be carried out faster and more safely. The problem with current applications is that they are small-scale prototypes that do not easily scale to large facility maintenance applications. This paper presents a new hybrid approach that enables the creation of augmented reality maintenance applications for large and hazardous scientific facilities. In this paper, a new augmented reality marker and the algorithm for its recognition is proposed. The performance of the algorithm is verified in three test cases, showing promising results in two of them. Improvements in robustness in the third test case in which the camera is moving quickly or when light conditions are extreme are subject to further studies. The proposed new approach will be integrated into an existing augmented reality maintenance system.

  1. The business case for condition-based maintenance: a hybrid (non-) financial approach

    NARCIS (Netherlands)

    Tiddens, W.W.; Tinga, T.; Braaksma, A.J.J.; Brouwer, O.; Cepin, Marko; Bris, Radim

    2017-01-01

    Although developing business cases is key for evaluating project success, the costs and benefits of condition-based maintenance (CBM) implementations are often not explicitly defined and evaluated. Using the design science methodology, we developed a hybrid business case approach to help managers

  2. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    International Nuclear Information System (INIS)

    Graeber, U.

    2003-01-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  3. Gender difference in safe and unsafe practice of pesticide handling in tobacco farmers of malaysia.

    Science.gov (United States)

    Bin Nordin, R; Araki, S; Sato, H; Yokoyama, K; Bin Wan Muda, W A; Win Kyi, D

    2001-01-01

    To identify gender difference in safe and unsafe practice of pesticide handling in tobacco farmers of Malaysia, we conducted a 20-item questionnaire interview on storage of pesticide (4 questions), mixing of pesticide (3 questions), use of personal protective equipment and clothing while spraying pesticide (7 questions), activities during and after spraying of pesticide (5 questions), and maintenance of pesticide sprayer (1 question) in 496 tobacco farmers (395 males and 101 females) in Bachok District, Kelantan, Malaysia. Duration of employment was significantly longer in females than those in males (pwork habit, (3) reading and following instructions on pesticide label, (4) security, storage and disposal of pesticide container, (5) safe work habit, (6) proper handling of pesticide and maintenance of pesticide sprayer, (7) use of personal protective clothing, and (8) safe handling of pesticide. Results of analysis of covariance for the eight factor scores of all male and female farmers, controlling for educational level and duration of employment, showed that: (1) factor scores for use of personal protective equipment (pwork habit (p0.05). We therefore conclude that: (1) for female tobacco farmers, choice of personal attire tend to result in lower scores on use of personal protective equipment and personal protective clothing while personal hygiene practices result in lower score on safe work habit; and, (2) for male tobacco farmers, the lower scores on reading and following instruction on pesticide label and mixing pesticide and maintenance of pesticide sprayer in good condition suggests that they were not primarily involved in these activities. It is postulated that these differences in safe and unsafe practices of pesticide handling across gender is related to the choice of personal attire, personal hygiene practices and division of labour within farming households which in turn is influenced by prevailing sociocultural norms in the community.

  4. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  5. Present state of condition based maintenance (CBM) and its future problem

    International Nuclear Information System (INIS)

    Hashimoto, Satoshi; Nogami, Takeki; Sugiyama, Naoki

    2008-01-01

    New inspection system of the nuclear power plant will be introduced from 2008. In this feature, eleven experts from electric utilities, venders and academia described their views or activities about Condition Based Maintenance (CBM) with a new inspection system attracting attention. These are titled as 'Electric utilities view on CBM and its technology', Deployment results of developed CBM technologies', 'Valve diagnostic analysis support system with wireless technology applied', 'Portable vibration checker', 'Tribology diagnosis with no overhaul', 'Infrared thermograph diagnosis', 'Pipewall thinning inspection and management' and, in addition, the US trend and also the development trend of the CBM advancement technology in the vender and university. CBM technology will be introduced step-by-step and contribute to establish reliability based maintenance. (T. Tanaka)

  6. Void Fraction Instrument operation and maintenance manual

    International Nuclear Information System (INIS)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

    1994-09-01

    This Operations and Maintenance Manual (O ampersand MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document

  7. Investigation of an innovative maintenance contracting strategy : the performance-based maintenance contract (PBMC).

    Science.gov (United States)

    2015-06-01

    One of the major responsibilities of state Departments of Transportation (DOTs) is to maintain their road assets so : that road users can travel cost effectively, safely, and in a timely manner. Maintenance projects can be performed : either by using...

  8. Condition-based maintenance for complex systems : Coordinating maintenance and logistics planning for the process industries

    NARCIS (Netherlands)

    Olde Keizer, Minou Catharina Anselma

    2016-01-01

    Maintenance planning in the process industries is extremely complex for various reasons. Plants often run nonstop, allowing little time for performing preventive maintenance. Failures should be prevented, however, as they can lead to system downtime and high losses of revenue. Corrective maintenance

  9. Maintenance of electromechanical equipment in quality organization under operating conditions

    International Nuclear Information System (INIS)

    Mercier, J.P.

    1984-01-01

    The paper outlines the principles adopted by the Thermal Production Service of Electricite de France on the basis of the experience of the first years of operation of its 900 MW(e)PWR units for the purpose of improving quality organization in operating conditions in respect of the maintenance of electromechanical safety equipment. This organization is based on application of the usual principles for quality assurance, adapted in accordance with current French regulations. The paper first recalls the now traditional methods of applying the principles of quality organization in the area of equipment maintenance. It then defines particular so-called ''delicate'' activities which, in accordance with the above regulations, are subjected to additional quality organizational procedures; this applies in particular to the area of pre-maintenance preparation and studies and to the control exercised by the French safety authorities over the execution of those activities. The paper explains how the application of the regulations improves maintenance practices compared with standard quality organization. It describes how the attempt to establish a frontier between these two types of activity (current and ''delicate'') has led to the definition of a classification criterion which is technically correct and simple to use and is based on the professional skills of those performing each activity. The paper then describes in greater detail the principal rules for the performance of those tasks which come under the standard organization and those to which more stringent criteria apply. Lastly, it explains the thinking behind equipment surveillance programmes and the analysis of anomalies discovered through surveillance measures or brought to light by operating incidents, the aim of these being to benefit from the experience gained

  10. Data mining and statistical process control for condition-based maintenance; Datamining und statistische Prozesskontrolle zur zustandsorientierten Instandhaltung

    Energy Technology Data Exchange (ETDEWEB)

    Deeskow, Peter; Steinmetz, Urs; Hay, Martin [Evonik Energy Services, Essen (Germany)

    2008-07-01

    Optimum, condition-based maintenance should balance the commercial consequences of an efficiency loss or a component failure and the cost of maintenance. This requires an early and highly reliable detection of abnormalities of the component/unit behaviour. For this purpose key performance indicators (KPIs) can be used which are online calculated from operational measurements and which solely depend on the component condition and do not depend on other influencing factors such as operation mode, load or ambient conditions. Software tools using data mining methods can facilitate the definition and calculation of such KPIs. (orig.)

  11. Development and Implementation of a Condition Based Maintenance Program for Geothermal Power Plants; FINAL

    International Nuclear Information System (INIS)

    Steve Miller; Jim Eddy; Murray Grande; Shawn Bratt; Manuchehr Shirmohamadi

    2002-01-01

    This report describes the development of the RCM team, identifying plant assets and developing an asset hierarchy, the development of sample Failure Mode Effects Analysis (FMEAs), identifying and prioritizing plant systems and components for RCM analysis, and identifying RCM/CBM software/hardware vendors. It also includes the Failure Mode Effects Analysis (FMEA) for all Class I Systems, Maintenance Task Assignments, use of Conditioned Based Maintenance (CBM) Tools and Displays of the RCM software System Development to date

  12. Assessment of diagnostic and prognostic condition indices for efficient and robust maintenance decision-making of systems subject to stress corrosion cracking

    International Nuclear Information System (INIS)

    Huynh, K.T.; Grall, A.; Bérenguer, C.

    2017-01-01

    Seeking condition indices characterizing the health state of a system is a key problem in condition-based maintenance. For this purpose, diagnostic and prognostic models have been unceasingly developed and improved over the past few decades; nevertheless none of them explains thoroughly the impacts of such indices on the effectiveness of maintenance operations. As a complement to these efforts, this paper analyzes the effectiveness of some well-known diagnostic and prognostic indices for maintenance decision-making. The study is based on a system subject to competing risks due to multiple crack paths. A periodic inspection scheme is used to monitor the system health state. Each inspection returns the perfect diagnostic information: the number of cracks, corresponding crack sizes, and the system failure/working state. Based on this information, two kinds of prognostic condition indices are predicted: the average value and probability law of the system residual useful life. The associated condition-based maintenance strategies and cost models are then developed and compared with the ones whose maintenance decisions are based on diagnostic condition indices. The comparison results allow us to conclude on the performance and on the robustness of these strategies, hence giving some suggestions on the choice of reliable condition indices for maintenance decision-making. - Highlights: • Developing a new and generic degradation and failure model. • Synthesizing diagnostic and prognostic condition indices on the basis of the developed degradation and failure model. • Building diagnosis and prognosis-based maintenance strategies, and developing the associated cost models. • Assessing the performance and robustness of the considered strategies to find out reliable indices.

  13. Quantified Risk Ranking Model for Condition-Based Risk and Reliability Centered Maintenance

    Science.gov (United States)

    Chattopadhyaya, Pradip Kumar; Basu, Sushil Kumar; Majumdar, Manik Chandra

    2017-06-01

    In the recent past, risk and reliability centered maintenance (RRCM) framework is introduced with a shift in the methodological focus from reliability and probabilities (expected values) to reliability, uncertainty and risk. In this paper authors explain a novel methodology for risk quantification and ranking the critical items for prioritizing the maintenance actions on the basis of condition-based risk and reliability centered maintenance (CBRRCM). The critical items are identified through criticality analysis of RPN values of items of a system and the maintenance significant precipitating factors (MSPF) of items are evaluated. The criticality of risk is assessed using three risk coefficients. The likelihood risk coefficient treats the probability as a fuzzy number. The abstract risk coefficient deduces risk influenced by uncertainty, sensitivity besides other factors. The third risk coefficient is called hazardous risk coefficient, which is due to anticipated hazards which may occur in the future and the risk is deduced from criteria of consequences on safety, environment, maintenance and economic risks with corresponding cost for consequences. The characteristic values of all the three risk coefficients are obtained with a particular test. With few more tests on the system, the values may change significantly within controlling range of each coefficient, hence `random number simulation' is resorted to obtain one distinctive value for each coefficient. The risk coefficients are statistically added to obtain final risk coefficient of each critical item and then the final rankings of critical items are estimated. The prioritization in ranking of critical items using the developed mathematical model for risk assessment shall be useful in optimization of financial losses and timing of maintenance actions.

  14. Condition-based maintenance effectiveness for series–parallel power generation system—A combined Markovian simulation model

    International Nuclear Information System (INIS)

    Azadeh, A.; Asadzadeh, S.M.; Salehi, N.; Firoozi, M.

    2015-01-01

    Condition-based maintenance (CBM) is an increasingly applicable policy in the competitive marketplace as a means of improving equipment reliability and efficiency. Not only has maintenance a close relationship with safety but its costs also make it even more attractive issue for researchers. This study proposes a model to evaluate the effectiveness of CBM policy compared to two other maintenance policies: Corrective Maintenance (CM) and Preventive Maintenance (PM). Maintenance policies are compared through two system performance indicators: reliability and cost. To estimate the reliability and costs of the system, the proposed Markovian discrete-event simulation model is developed under each of these policies. The applicability and usefulness of the proposed Markovian simulation model is illustrated for a series–parallel power generation system. The simulated characteristics of CBM system include its prognostics efficiency to estimate remaining useful life of the equipment. Results show that with an efficient prognostics, CBM policy is an effective strategy compared to other maintenance strategies. - Highlights: • A model is developed to evaluate the effectiveness of CBM policy. • Maintenance policies are compared through reliability and cost. • A Markovian simulation model is developed. • A series–parallel power generation system is considered. • CBM is an effective strategy compared to others

  15. Prepare to protect: Operating and maintaining a tornado safe room.

    Science.gov (United States)

    Herseth, Andrew; Goldsmith-Grinspoon, Jennifer; Scott, Pataya

    2017-06-01

    Operating and maintaining a tornado safe room can be critical to the effective continuity of business operations because a firm's most valuable asset is its people. This paper describes aspects of operations and maintenance (O&M) for existing tornado safe rooms as well as a few planning and design aspects that affect the ultimate operation of a safe room for situations where a safe room is planned, but not yet constructed. The information is based on several Federal Emergency Management Agency safe room publications that provide guidance on emergency management and operations, as well as the design and construction of tornado safe rooms.

  16. Considerations on Fail Safe Design for Design Basis Accident (DBA) vs. Design Extension Condition (DEC): Lesson Learnt from the Fukushima Accident

    International Nuclear Information System (INIS)

    Ha, Jun Su; Kim, Sungyeop

    2014-01-01

    The fail safety design is referred to as an inherently safe design concept where the failure of an SSC (System, Structure or Component) leads directly to a safe condition. Usually the fail safe design has been devised based on the design basis accident (DBAs), because the nuclear safety has been assured by securing the capability to safely cope with DBAs. Currently regards have been paid to the DEC (Design Extension Condition) as an extended design consideration. Hence additional attention should be paid to the concept of the fail safe design in order to consider the DEC, accordingly. In this study, a case chosen from the Fukushima accident is studied to discuss the issue associated with the fail safe design in terms of DBA and DEC standpoints. For the fail safe design to be based both on the DBA and the DEC, a Mode Changeable Fail Safe Design (MCFSD) is proposed in this study. Additional discussions on what is needed for the MCFSD to be applied in the nuclear safety are addressed as well. One of the lessons learnt from the Fukushima accident should include considerations on the fail-safe design in a changing regulatory framework. Currently the design extension condition (DEC) including severe accidents should be considered during designing and licensing NPPs. Hence concepts on the fail safe design need to be changed to be based on not only the DBA but also the DEC. In this study, a case on a fail-safe design chosen from the Fukushima accident is studied to discuss the issue associated with the fail safe design in terms of DBA and DEC conditions. For the fail safe design to be based both on the DBA and the DEC, a Mode Changeable Fail Safe Design (MCFSD) is proposed in this study. Additional discussions on what is needed for the MCFSD to be applied in the nuclear safety are addressed as well

  17. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1998-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  18. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  19. Program integration of predictive maintenance with reliability centered maintenance

    International Nuclear Information System (INIS)

    Strong, D.K. Jr; Wray, D.M.

    1990-01-01

    This paper addresses improving the safety and reliability of power plants in a cost-effective manner by integrating the recently developed reliability centered maintenance techniques with the traditional predictive maintenance techniques of nuclear power plants. The topics of the paper include a description of reliability centered maintenance (RCM), enhancing RCM with predictive maintenance, predictive maintenance programs, condition monitoring techniques, performance test techniques, the mid-Atlantic Reliability Centered Maintenance Users Group, test guides and the benefits of shared guide development

  20. Bayesian based Diagnostic Model for Condition based Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud; Sørensen, John Dalsgaard

    2018-01-01

    Operation and maintenance costs are a major contributor to the Levelized Cost of Energy for electricity produced by offshore wind and can be significantly reduced if existing corrective actions are performed as efficiently as possible and if future corrective actions are avoided by performing...... sufficient preventive actions. This paper presents an applied and generic diagnostic model for fault detection and condition based maintenance of offshore wind components. The diagnostic model is based on two probabilistic matrices; first, a confidence matrix, representing the probability of detection using...... for a wind turbine component based on vibration, temperature, and oil particle fault detection methods. The last part of the paper will have a discussion of the case study results and present conclusions....

  1. Maintenance philosophy and program at Cernavoda NPP

    International Nuclear Information System (INIS)

    Bobos, M.; Enciu, G.

    1994-01-01

    Maintenance plays a key role in ensuring safe and reliable operation. An effective maintenance program should ensure that installed equipment operates when needed and the equipment malfunctions or deficiencies are corrected in time and rarely recur. Maintenance includes not only the activities traditionally associated with identifying or correcting current or potential equipment deficiencies but also extends to supporting technical functions for the conduct of these activities (for example, engineering, technical support, chemistry control, radiological protection, industrial safety and training). The maintenance management program should clearly define the relationship among these supporting groups as it is related to overall plant maintenance and promotes the concept of a successful integrated team effort. (Author)

  2. Maintenance in nuclear production power plants

    International Nuclear Information System (INIS)

    Lozano, J. M.

    2010-01-01

    This article highlights the importance and quality of maintenance in the complete phases of development, in a sector which has been often questioned by the public opinion, and that is always subject to national and international standards. The aim of maintenance is to guarantee the production of electric power in a reliable, safe, economic and friendly environmentally way, assuring a long-term production. (Author)

  3. Residual life management. Maintenance improvement; Gestion de vida remanente. Mejora del mantenimiento

    Energy Technology Data Exchange (ETDEWEB)

    Sainero Garcia, J; Hevia Ruperez, F

    1996-12-31

    The terms Residual Life Management, Life Cycle Management and Long-Term Management are synonymous with a concept which aims to establish efficient maintenance for the profitable and safe operation of a power plant for as long as possible. A Residual Life Management programme comprises a number of stages, of which Maintenance Evaluation focuses on how power plant maintenance practices allow the mitigation and control of component ageing. with this objective in mind, a methodology has been developed for the analysis of potential degradative phenomena acting on critical components in terms of normal power plant maintenance practices. This methodology applied to maintenance evaluation enables the setting out of a maintenance programme based on the Life Management concept, and the programme`s subsequent up-dating to allow for new techniques and methods. Initial applications have shown that although, in general terms, power plant maintenance is efficient, the way in which Residual Life Management is approached requires changes in maintenance practices. These changes range from modifications to existing inspection and surveillance methods or the establishment of new ones, to the monitoring of trends or the performance of additional studies, the purpose of which is to provide an accurate evaluation of the condition of the installations and the possibility of life extension. (Author)

  4. Health risk air-conditioning system; Insufficient maintenance increases the risk of illness. Gesundheitsrisiko Klimaanlagen; Unzureichende Wartung erhoeht das Erkrankungsrisiko

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1994-01-01

    In Germany every fifth employee who works in air-conditioned rooms complains about headache, an increased proneness to colds and influenza infections as well as allergic reactions. These troubles are often caused by the insufficient maintenance of air-conditioning systems. At present only 15% of the estimated annual demand for maintenance of space hvac-systems is actually carried out. Problematic in case of air-conditioning systems are the so-called air washers used for air humidification which can become an ideal cultur medium for microorganisms. A second problematic area are the often very dirty filters. But health risks can be avoided with regular expert maintenance alone. As first step an analysis of the causes of faults is proposed. (BWI)

  5. Improvement of condition-based maintenance technology by utilization of thermography

    International Nuclear Information System (INIS)

    Shimada, Hiroki

    2004-01-01

    In the United States, condition-based maintenance technology comprising IR thermography (hereafter ''thermography'' for short) has been regarded in recent years as the established means for effectively improvement the performance of accident-preventive measures for nuclear power stations. As very few nuclear power plants in Japan have been utilizing the technology, measures for allowing power station personnel to use the technology with ease have been studied on an empirical basis. First, in view of improving the measuring efficiency to determine temperatures more accurately with a single measurement, principal factors affecting the measured temperature values have been analyzed. As a result, it has been found effective for accurate temperature measurement to make use of the table to radiation rates that have been determined for each facility coating specification by using a black body tape and to determine the measuring spot by avoiding rear heat sources (influence of reflection ratio) and background noise (influence of scattered light). Concurrently, as a result of determining the IR attenuation in the atmosphere, thermographic measurement has been found feasible without any significant attenuation as long as the distance is below 10 meters. Further, every power station facility (mainly electrical facilities) that is immune to thermography has been identified. These study results have been documented in the form of the ''Thermography Measurement Manual'' by also including in it the descriptions on abnormal thermal images and the judgment criteria at elevated temperatures that have been used in the United States. Based on these accomplishments, condition-based maintenance technology employing thermography has been applied to on-site investigation of nuclear power stations, and the effectiveness of thermography-aided accident-prevention has been demonstrated by detecting locally temperature rising spots of power cable joints. Moreover, with respect to maintenance

  6. A Real-Time Quantitative Condition Alerting and Analysis Support System for Aircraft Maintenance, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Financial constraints, government recommendations, and the need for improved operational efficiency are requiring airlines to review their "on-condition" maintenance...

  7. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    Energy Technology Data Exchange (ETDEWEB)

    Graeber, U.

    2003-07-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  8. Psychosocial aspect of safe operation in Japanese nuclear power plants

    International Nuclear Information System (INIS)

    Kuroda, Isao

    1988-01-01

    It is not easy to reveal the reasons of safe operation of N.P.P. because many complicated factors are interrelated. However, to clarify the effective factors of the recent safe operation of Japanese N.P.P. is the important thema of research to continue this condition and the more improved level. At present, the follwing factors can be pointed out; 1) Influential safety policy of regulatory structures. 2) Enthusiastic and careful company policy on N.P.P. safety. 3) Close and stable relationship of the industries with companies on research, training and maintenance. 4) Collaborated safety research among scientific facilities, companies and manufacturers. 5) Good organization and management for N.P.P. personnel. 6) Well organized training program in company and training facilities. 7) Highly motivated N.P.P. personnel with high educational background. 8) Company atmosphere on N.P.P. safety. 9) Public opinion on nuclear power safety. (author)

  9. Maintenance management sourcing strategies and the condition of ...

    African Journals Online (AJOL)

    In the face of the deplorable state of buildings across the various tertiary institutions in Nigeria, the need to deploy appropriate maintenance management strategy cannot be overemphasized. However, sourcing decision for maintenance services remains a tough one for decision makers as different sourcing option suit ...

  10. Psychological Conditions of Engagement among Community College Maintenance Employees: A Cross-Sectional Study

    Science.gov (United States)

    Franks, Tammy T.

    2017-01-01

    This dissertation examined the relationship between employee engagement and the factors that may influence the three psychological conditions of engagement: meaningfulness, safety, and availability for the sector of employees classified as maintenance, grounds, and custodial employees in a community college setting. The factors for each of the…

  11. Pavement condition assessment to forecast maintenance program on JKR state roads in Petaling district

    Science.gov (United States)

    Hamsan, R.; Hafiz, H.; Azlan, A.; Keprawi, M. F.; Malik, A. K. A.; Adamuddin, A.; Abdullah, A. H.; Shafie, A. M.

    2018-02-01

    This research allows local authorities to project road maintenance in term of activities and financial expenditure through pavement condition assessment and then Highway Development and Management (HDM-4) analysis. Current form of road maintenance carried out by local authority is on reactive manner where corrective actions were taken based on reports recorded. Some went unrecorded hence causing prolonged damages. This causes the local authority unable to project the required cost to maintain the roads. This affects the socio-economy of the surrounding routes. Hence, it is seen, as preventive maintenance of the roads will provide more feasible option in term of work force and finance to the local authority. To overcome this issue, a preventive model was introduced. This was done through pavement condition assessment (PCA) where analysis was done through HDM-4. Nondestructive test and destructive test were conducted in order to provide an indicator to the road's health. This were then analyzed in HDM-4 where the result was benchmarked with maintenance standard. The scope of this research is set to PCA where DT and NDT were performed on the routes of Petaling and the output is analyzed in HDM-4. The result of this research provides a 10 years forecast maintenance budget in maintaining the roads in Petaling. This allows the local authority to perform good practice in term of maintaining the roads while at the same time helps them in forecasting their budget for the upcoming years. This research will have a strong impact on the local socio-economy as well as local road user confidence towards the authority over good practices. This research can be further expanded to other type of roads as well as highway bridges.

  12. An Optimization Method for Condition Based Maintenance of Aircraft Fleet Considering Prognostics Uncertainty

    Directory of Open Access Journals (Sweden)

    Qiang Feng

    2014-01-01

    Full Text Available An optimization method for condition based maintenance (CBM of aircraft fleet considering prognostics uncertainty is proposed. The CBM and dispatch process of aircraft fleet is analyzed first, and the alternative strategy sets for single aircraft are given. Then, the optimization problem of fleet CBM with lower maintenance cost and dispatch risk is translated to the combinatorial optimization problem of single aircraft strategy. Remain useful life (RUL distribution of the key line replaceable Module (LRM has been transformed into the failure probability of the aircraft and the fleet health status matrix is established. And the calculation method of the costs and risks for mission based on health status matrix and maintenance matrix is given. Further, an optimization method for fleet dispatch and CBM under acceptable risk is proposed based on an improved genetic algorithm. Finally, a fleet of 10 aircrafts is studied to verify the proposed method. The results shows that it could realize optimization and control of the aircraft fleet oriented to mission success.

  13. Development of methods for the evaluation and reduction of risk factors for the maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Preuss, W.; Ogurek, K.H.

    1988-01-01

    The maintenance of a nuclear power plant is an essential requirement for its safe operation. Recent experience has however revealed increasingly more deviations and disturbances associated with maintenance work - in particular related to human error. The investigations should contribute to the further improvement of the conditions for safe and optimal maintenance procedures and thus minimize the risk of disturbances arising from them. The first step of the investigation is presented here, in which the methodological preliminary work was carried out and a suitable procedure developed. A basis was provided by means of extensive literature research and analysis. Additional information was obtained through discussions with experts (research workers as well as plant operational management). In particular suitable techniques of investigation and analysis are presented in detail, the problem structure of the field of investigation bas been worked out, and a methodology for the evaluation of data has been developed. Furthermore criteria have been formulated with which nuclear power plants and maintenance processes can be choosen for an economic way of investigation, and a procedure is presented which serves the investigator to check and to improve the methodology. Finally, proposals for further investigations are given. (orig.) [de

  14. Maintenance cost optimization in condition based maintenance: a case study for critical facilities

    OpenAIRE

    Filippo De Carlo; Maria Antonietta Arleo

    2013-01-01

    The increasing availability required to industrial plants and the limited budget often existing to assure it, require a careful formulation of maintenance optimization models. This need is primary for process plants, for which minimization of stops and maximization of their availability, are essential for ensuring targeted production and, therefore, profitability. In this context, the choice of the maintenance strategy is hence fundamental, depending on the system features and then on the eff...

  15. A condition-based maintenance policy with non-periodic inspections for a two-unit series system

    International Nuclear Information System (INIS)

    Castanier, B.; Grall, A.; Berenguer, C.

    2005-01-01

    This paper considers a condition-based maintenance policy for a two-unit deteriorating system. Each unit is subject to gradual deterioration and is monitored by sequential non-periodic inspections. It can be maintained by good as new preventive or corrective replacements. Every inspection or replacement entails a set-up cost and a component-specific unit cost but if actions on the two components are combined, the set-up cost is charged only once. A parametric maintenance decision framework is proposed to coordinate inspection/replacement of the two components and minimize the long-run maintenance cost of the system. A stochastic model is developed on the basis of the semi-regenerative properties of the maintained system state and the associated cost model is used to assess and optimize the performance of the maintenance model. Numerical experiments emphasize the interest of a control of the operation groupings

  16. Advances in safety related maintenance

    International Nuclear Information System (INIS)

    2000-03-01

    The maintenance of systems, structures and components in nuclear power plants (NPPs) plays an important role in assuring their safe and reliable operation. Worldwide, NPP maintenance managers are seeking to reduce overall maintenance costs while maintaining or improving the levels of safety and reliability. Thus, the issue of NPP maintenance is one of the most challenging aspects of nuclear power generation. There is a direct relation between safety and maintenance. While maintenance alone (apart from modifications) will not make a plant safer than its original design, deficient maintenance may result in either an increased number of transients and challenges to safety systems or reduced reliability and availability of safety systems. The confidence that NPP structures, systems and components will function as designed is ultimately based on programmes which monitor both their reliability and availability to perform their intended safety function. Because of this, approaches to monitor the effectiveness of maintenance are also necessary. An effective maintenance programme ensures that there is a balance between the improvement in component reliability to be achieved and the loss of component function due to maintenance downtime. This implies that the safety level of an NPP should not be adversely affected by maintenance performed during operation. The nuclear industry widely acknowledges the importance of maintenance in NPP safety and operation and therefore devotes great efforts to develop techniques, methods and tools to aid in maintenance planning, follow-up and optimization, and in assuring the effectiveness of maintenance

  17. Flexible Software Solution for Information System of Maintenance and Repair in Armenian NPP Medzamor

    International Nuclear Information System (INIS)

    Stoilova Yordanova, V.; Manchev, B.

    2016-01-01

    Achieving high performance in maintenance and repair activities in nuclear facilities and good results in this area is not possible without proper planning. This includes long-term, medium-term and annual planning. A computerized information maintenance management system is a tool widely used by nuclear operators to achieve safe, reliable, stable and predictable plant operation. Development and implementation of such a system in the Armenian NPP Medzamor (ANPP) was initiated by the European Commission (EC) in August 2013 based on the decision of ANPP management to improve practice in terms of planning and carrying out maintenance and repair of plant structures, systems and components (SSCs). The main purpose for the development and deployment of information maintenance management system in ANPP is creation of a systematic approach to the distribution of tasks between the maintenance personnel as well as the timing and methods of their implementation - on which systems, structures and components, maintenance frequency, while the ultimate goal is to optimize the use of resources for maintenance and to ensure plant safe operation and reliability. In November 2013 a contract between European Commission and consortium Risk Engineering -David Holding was signed, including the following supplies: Hardware for the information system of ANPP (called us Archimed MRO); Specification, design and development of the software of Archimed MRO, installation of the system, data migration, training of ANPP staff operating the system, and 9 months trial operation. In the process of specifying the functionality of the system the main purpose was to provide modern information tools to help improve the work of ANPP personnel in the following areas: Optimization of ANPP maintenance program; Planning of maintenance, repair and overhaul (MRO) activities; Effective management of the processes of MRO; Analysis of the MRO results (trend analysis, recurrence of repairs, quality of the repairs

  18. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  19. Pedagogical conditions of maintenance of integrity of process of socialization-individualization of children-orphans

    OpenAIRE

    Pronina A. N.

    2011-01-01

    Formation of the high-grade person of children of preschool age, without parental support should be carried out in complete process of socialization-individualization that assumes working out of the pedagogical conditions directed on maintenance of interrelation of processes of socialization and an individualization.

  20. Knowledge lost in data : Organizational impediments to condition-based maintenance in the process industry

    NARCIS (Netherlands)

    van de Kerkhof, Roland; Akkermans, Henk; Noorderhaven, Niels; Zijm, H.; Klumpp, M.; Clausen, U.; Ten Hompel, M.

    2016-01-01

    In this chapter we report on a pilot study of Condition-Based Maintenance (CBM) in the process industries, such as the steelmaking- and chemical industries, and propose a diagnostic instrument for systematically analysing the challenges to the successful implementation and execution of a CBM

  1. Atomic Energy Control Board (AECB) staff assessment and views of current maintenance practices of a four unit CANDU plant

    International Nuclear Information System (INIS)

    Malek, I.

    1995-01-01

    This paper discusses the AECB practices in assessing maintenance activities at one four unit CANDU nuclear plant.-it outlines the authority of the AECB in enforcing the licence condition concerned with maintenance, and how this is interpreted by AECB site staff to measure and report maintenance activities. The AECB staff attaches great importance to proper maintenance as it affects safe operation. Programs used by the licensee staff to identify safety important components, or to predict degradations and failures are of particular interest. In our experience, the application of such programs has been generally good. However, their integration into an overall maintenance scheme can be improved, and the possibilities of integration are not well understood. This paper includes examples of such integration to illustrate our views and to highlight the resultant benefits that AECB staff believes are possible. (author)

  2. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  3. A condition-based maintenance of a dependent degradation-threshold-shock model in a system with multiple degradation processes

    International Nuclear Information System (INIS)

    Caballé, N.C.; Castro, I.T.; Pérez, C.J.; Lanza-Gutiérrez, J.M.

    2015-01-01

    This paper proposes a condition-based maintenance strategy for a system subject to two dependent causes of failure: degradation and sudden shocks. The internal degradation is reflected by the presence of multiple degradation processes in the system. Degradation processes start at random times following a Non-homogeneous Poisson process and their growths are modelled by using a gamma process. When the deterioration level of a degradation process exceeds a predetermined value, we assume that a degradation failure occurs. Furthermore, the system is subject to sudden shocks that arrive at the system following a Doubly Stochastic Poisson Process. A sudden shock provokes the total breakdown of the system. Thus, the state of the system is evaluated at inspection times and different maintenance tasks can be carried out. If the system is still working at an inspection time, a preventive maintenance task is performed if the deterioration level of a degradation process exceeds a certain threshold. A corrective maintenance task is performed if the system is down at an inspection time. A preventive (corrective) maintenance task implies the replacement of the system by a new one. Under this maintenance strategy, the expected cost rate function is obtained. A numerical example illustrates the analytical results. - Highlights: • A condition-based maintenance model is proposed. • Two dependent causes of failure are considered: deterioration and external shocks. • Deterioration is given by multiple degradation processes growing by a gamma process. • The initiation of degradation processes follows a Non-homogeneous Poisson process. • External shocks arrive at the system by using a Doubly Stochastic Poisson Process

  4. Maintenance for life management

    International Nuclear Information System (INIS)

    Hevia, F.

    1997-01-01

    Life Management is based on the detection, monitoring and control of long-term degradation that affects individual plant components and important populations. Experience has shown that in many cases current maintenance practices do not attend to ageing directly; instead they deal with the consequences when it is already too late, when good Life Management is no longer practical. This has brought about the need for specific Maintenance Evaluation and Improvement Programmes to adjust to the basic objective of Life Management which is to project against, monitor and mitigate ageing that can affect the safe and profitable operating life of the facility. New regulatory requirements for ageing monitoring and effective maintenance to ensure safety (Maintenance Rule) have made it even more necessary to implement the Maintenance Evaluation Programme to cope with ageing, and to integrate that tasks in both programmes to optimise effort and use of tools. This paper presents a brief description of the objectives and methodologies of these Programmes which has been applied to plants around the world and in Spain at the Garona and Vandellos II plants in Spain as part of the PIE project for developing a Remanent Life Evaluation System for nuclear power plants. (Author)

  5. Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    COX, G.J.

    1999-01-01

    This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action

  6. The dynamic pressure measurements of the nuclear reactor coolant for condition-based maintenance of the reactor

    International Nuclear Information System (INIS)

    Es-Saheb, M.H.H.

    1990-01-01

    The condition-based maintenance of the nuclear reactor, by monitoring and measuring the instantaneous dynamic pressure distribution of the coolant (water) impact on the solid surfaces of the reactor during operation is presented. The behaviour of water domes (jets) produced by underwater explosions of small changes of P.E.T.N. at various depths in two different size cylindrical containers, which simulate the nuclear reactor, is investigated. Water surface domes (jets) from the underwater explosions are photographed. Depending on the depth of the charge, curved and flat top jets of up to 455 mm diameter and impact speeds of up to 70 m/sec. are observed. The instabilities in the dome surfaces are observed and the instantaneous profiles are analysed. It is found that, in all cases tested, the maximum pressure takes place at the center of the jet and could reach up to 3.0 times the on-dimensional impact pressure value. The use of their measurements, as online monitoring for condition-based maintenance and design-out maintenance is discussed. 18 refs

  7. The review of online maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    Yamamoto, Tetsuya

    2009-01-01

    The Nuclear and Industrial Safety Agency (NISA) has begun the review of online maintenance in nuclear power plants in its advisory committee. The experts in the committee study the necessary actions in the regulation and safe and secure measure to implement the online maintenance. This paper explains the current progress of the review. (author)

  8. Preventative maintenance plan for emergency pumping trailers

    International Nuclear Information System (INIS)

    Wiggins, D.D.

    1994-09-01

    The purpose/goal of this document is to identify the maintenance requirements and resources available to properly maintain the readiness and condition of the Emergency Pumping Equipment controlled by the Tank Waste Remediation System Tank Farms Plant Engineering and Tank Stabilization Operations. This equipment is intended to pump a single-shell tank (SST) that has been identified as an assumed leaking tank. The goal is to commence pumping (submersible or jet) as soon as safely possible after identifying a SST as an assumed leaking tank. Important information pertaining to the Emergency Pumping Equipment, Over-Ground Piping installation, and procedures is found in WHC-SD-WM-AP-005, ''Single Shell Tank Leak Emergency Pumping Guide.''

  9. Condition-based maintenance at both scheduled and unscheduled opportunities

    NARCIS (Netherlands)

    Kalosi, S.; Kapodistria, S.; Resing, J.A.C.

    2016-01-01

    Motivated by original equipment manufacturer (OEM) service and maintenance practices we consider a single component subject to replacements at failure instances and two types of preventive maintenance opportunities: scheduled, which occur due to periodic system reviews of the equipment, and

  10. Surface Moisture Measurement System Operation and Maintenance Manual

    International Nuclear Information System (INIS)

    Ritter, G.A.; Pearce, K.L.; Stokes, T.L.

    1995-12-01

    This operations and maintenance manual addresses deployment, equipment and field hazards, operating instructions, calibration verification, removal, maintenance, and other pertinent information necessary to safely operate and store the Surface Moisture Measurement System (SMMS) and Liquid Observation Well Moisture Measurement System (LOWMMS). These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  11. The ITER remote maintenance system

    International Nuclear Information System (INIS)

    Tesini, A.; Palmer, J.

    2008-01-01

    The aim of this paper is to summarize the ITER approach to machine components maintenance. A major objective of the ITER project is to demonstrate that a future power producing fusion device can be maintained effectively and offer practical levels of plant availability. During its operational lifetime, many systems of the ITER machine will require maintenance and modification; this can be achieved using remote handling methods. The need for timely, safe and effective remote operations on a machine as complex as ITER and within one of the world's most hostile remote handling environments represents a major challenge at every level of the ITER Project organization, engineering and technology. The basic principles of fusion reactor maintenance are presented. An updated description of the ITER remote maintenance system is provided. This includes the maintenance equipment used inside the vacuum vessel, inside the hot cell and the hot cell itself. The correlation between the functions of the remote handling equipment, of the hot cell and of the radwaste processing system is also described. The paper concludes that ITER has equipped itself with a good platform to tackle the challenges presented by its own maintenance and upgrade needs

  12. Condition based monitoring, diagnosis and maintenance on operating equipments of a hydraulic generator unit

    International Nuclear Information System (INIS)

    Liu, X T; Feng, F Z; Si, A W

    2012-01-01

    According to performance characteristics of operating equipments in a hydraulic generator unit (HGU), the relative techniques on condition monitoring and fault diagnosis (CMFD) are introduced in this paper, especially the key technologies are emphasized, such as equipment monitoring, expert system (ES), intelligent diagnosis and condition based maintenance (CBM). Meanwhile, according to the instructor on CBM proposed by State electric power corporation, based on integrated mode, the main steps on implementation of CBM are discussed in this paper.

  13. Risk-based maintenance-Techniques and applications

    International Nuclear Information System (INIS)

    Arunraj, N.S.; Maiti, J.

    2007-01-01

    Plant and equipment, however well designed, will not remain safe or reliable if it is not maintained. The general objective of the maintenance process is to make use of the knowledge of failures and accidents to achieve the possible safety with the lowest possible cost. The concept of risk-based maintenance was developed to inspect the high-risk components usually with greater frequency and thoroughness and to maintain in a greater manner, to achieve tolerable risk criteria. Risk-based maintenance methodology provides a tool for maintenance planning and decision making to reduce the probability of failure of equipment and the consequences of failure. In this paper, the risk analysis and risk-based maintenance methodologies were identified and classified into suitable classes. The factors affecting the quality of risk analysis were identified and analyzed. The applications, input data and output data were studied to understand their functioning and efficiency. The review showed that there is no unique way to perform risk analysis and risk-based maintenance. The use of suitable techniques and methodologies, careful investigation during the risk analysis phase, and its detailed and structured results are necessary to make proper risk-based maintenance decisions

  14. Condition-based maintenance. With application on a heat exchanger and a pump; Tillstaandsbaserat underhaall. Med applikation paa en vaermevaexlare och en pump

    Energy Technology Data Exchange (ETDEWEB)

    Raaberg, Martin; Slaetteke, Ola

    2012-02-15

    Regular maintenance is required to extend the life of a plant's components and maintain optimum operation. Unnecessary outages from maintenance may inflict large monetary losses. Therefore, a cost-effective maintenance system should be condition-based rather than time-based. The optimal maintenance scheme requires a process model and a forecast of the operation conditions of this model. At least one of the model parameters should be affected by the maintenance. To determine the actual status of the plant, the model parameters should be estimated. This requires an analysis of available data to detect degradation of the critical components performance. Base load plants usually operate at maximum production or as close to maximum as possible at stabile conditions during long periods. Since the operating time is long and usually at high load in base load plants, advanced control systems and maintenance planning is most profitable in such plants. Advanced control and process optimization requires dynamic process models. Due to the long operating time of a base load plant, it is natural that its process characteristics change, such as wear and fouling. This means that models must be adapted continuously in order to generate a good approximation and thus a good basis for control and optimization. The problem is that the stable operation condition of a base load plant prevents a good estimate of model parameters through the lack of excitation of the process

  15. Quality Control Activities Related to Mechanical Maintenance of Safety Related Components at Krsko NPP

    International Nuclear Information System (INIS)

    Djakovic, D.

    2016-01-01

    For successful, safe and reliable operation of nuclear power plant, maintenance processes have to be systematically controlled and procedures for quality control of maintenance activities shall be established. This is requested by the quality assurance program, which shall provide control over activities affecting the quality of structures, systems, and components, considering their importance to safety. As a part of Quality and Nuclear Oversight Division (QNOD; SKV), the Quality Control Department (QC) provides quality control activities, which are deeply involved in maintenance processes at Krsko NPP, both on safety related and non-safety related (non-nuclear safety) components. QC activities on safety related components have to fulfil all requirements, which will enable the components to perform their intended safety functions. This paper describes quality control activities related to mechanical maintenance of safety related components at Krsko NPP and significant role of the Krsko plant QC Department in three particular maintenance cases connected with safety related components. In these three specific cases, the QC has confirmed its importance in compliance with quality assurance program and presented its significant added value in providing safe and reliable operation of the plant. The first maintenance activity was installation of nozzle check valves in the scope of a modification for improving regulation of spent fuel pit pumps. The QC Department performed receipt inspection of the valves. Using non-destructive examination methods and X-ray spectrometry, it was found out that the valve diffuser was made of improper material, which could cause progressive corrosion of the valve diffuser in borated water and consequently a loss of safety function of the valves followed by long-term consequences. The second one was the receipt inspection of containment ventilation fan coolers. The coolers were claimed and sent back to the supplier because the QC Department

  16. Performing maintenance activities on-line a risk perspective

    International Nuclear Information System (INIS)

    Darling, S.S.; Mairs, T.P.

    1993-01-01

    The US nuclear power industry is attempting to deal with the issue of optimizing the performance of maintenance activities with the advent of the maintenance rule. The impact of any maintenance activity on the safe operation of a nuclear power facility can be quantified on the basis of risk. Therefore, it is incumbent upon the industry to accommodate the regulator and present a maintenance optimization program in terms that explicitly address the potential risk inherent in its concept and implementation. The motivation for utilities to perform maintenance while the plant is operating (i.e., on-line) is readily perceived to offer the following advantages: 1. greater system availability; 2. higher plant capacity factor; 3. more evenly distributed workload for the maintenance department; and 4. overall safer plant operation. However, risks inherent in undertaking maintenance activities during power operation could amount to the realization that reapportionment of these tasks is not cost-beneficial. Therefore, it is important that any utility considering implementing such a paradigm in maintenance philosophy establish a rigorous process to select, perform, and monitor maintenance tasks performed while operating

  17. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  18. 45 CFR 310.20 - What are the conditions for funding the installation, operation, maintenance and enhancement of...

    Science.gov (United States)

    2010-10-01

    ... Tribal IV-D Systems and Office Automation § 310.20 What are the conditions for funding the installation... 45 Public Welfare 2 2010-10-01 2010-10-01 false What are the conditions for funding the installation, operation, maintenance and enhancement of Computerized Tribal IV-D Systems and Office Automation...

  19. Application of T2 Control Charts and Hidden Markov Models in Condition-Based Maintenance at Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Emilija Kisić

    2015-01-01

    Full Text Available An innovative approach to condition-based maintenance of coal grinding subsystems at thermoelectric power plants is proposed in the paper. Coal mill grinding tables become worn over time and need to be replaced through time-based maintenance, after a certain number of service hours. At times such replacement is necessary earlier or later than prescribed, depending on the quality of the coal and of the grinding table itself. Considerable financial losses are incurred when the entire coal grinding subsystem is shut down and the grinding table found to not actually require replacement. The only way to determine whether replacement is necessary is to shut down and open the entire subsystem for visual inspection. The proposed algorithm supports condition-based maintenance and involves the application of T2 control charts to distinct acoustic signal parameters in the frequency domain and the construction of Hidden Markov Models whose observations are coded samples from the control charts. In the present research, the acoustic signals were collected by coal mill monitoring at the thermoelectric power plant “Kostolac” in Serbia. The proposed approach provides information about the current condition of the grinding table.

  20. A selection of problems related to safe working conditions in nuclear power plants

    International Nuclear Information System (INIS)

    Brunner, K.H.

    1984-01-01

    Two representative examples were chosen to demonstrate that the problems related to safe working conditions can be solved with work being prepared extensively and in detail taking into consideration radiation protection and conventional job safety measures and with qualified staff. Most of the job safety problems in nuclear power plants are pretty much the same as in conventional plants. Despite successful implementation of employment and radiation protection in nuclear power plants, improvements in detail are possible and make sense. (orig.) [de

  1. The safe home project.

    Science.gov (United States)

    Arphorn, Sara; Jiraniratisai, Sopaphan; Rungtakul, Rungsri; Phutta, Nikom

    2011-12-01

    The Thai Health Promotion Foundation supported the Improvement of Quality of Life of Informal Workers project in Ban Luang District, Amphur Photaram, Ratchaburi Province. There were many informal workers in Ban Luang District. Sweet-crispy fish producers in Ban Luang were the largest group among the sweet-crispy fish producers in Thailand. This project was aimed at improving living and working conditions of informal workers, with a focus on the sweet-crispy fish group. Good practices of improved living and working conditions were used to help informal workers build safe, healthy and productive work environments. These informal workers often worked in substandard conditions and were exposed to various hazards in the working area. These hazards included risk of exposure to hot work environment, ergonomics-related injuries, chemical hazards, electrical hazards etc. Ergonomics problems were commonly in the sweet-crispy fish group. Unnatural postures such as prolonged sitting were performed dominantly. One hundred and fifty informal workers participated in this project. Occupational health volunteers were selected to encourage occupational health and safety in four groups of informal workers in 2009. The occupational health volunteers trained in 2008 were farmers, beauty salon workers and doll makers. The occupational health and safety knowledge is extended to a new informal worker group: sweet-crispy fish producer, in 2009. The occupational health and safety training for sweet-crispy fish group is conducted by occupational health volunteers. The occupational health volunteers increased their skills and knowledge assist in to make safe home and safe community through participatory oriented training. The improvement of living and working condition is conducted by using a modified WISH, Work Improvement for Safe Home, checklist. The plans of improvement were recorded. The informal workers showed improvement mostly on material handling and storage. The safe uses and safe

  2. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  3. AIRCRAFT MAINTENANCE HANGAR

    Directory of Open Access Journals (Sweden)

    GEAMBASU Gabriel George

    2017-05-01

    Full Text Available The paper presents the maintenance process that is done on an airplane, at a certain period of time, or after a number of flight hours or cycles and describes the checks performed behind each inspection. The first part of research describes the aircraft maintenance process that has to be done after an updated maintenance manual according with aircraft type, followed by a short introduction about maintenance hangar. The second part of the paper presents a hangar design with a foldable roof and walls, which can be folded or extended, over an airplane when a maintenance process is done, or depending on weather condition.

  4. Safety constraints applied to an adaptive Bayesian condition-based maintenance optimization model

    International Nuclear Information System (INIS)

    Flage, Roger; Coit, David W.; Luxhøj, James T.; Aven, Terje

    2012-01-01

    A model is described that determines an optimal inspection and maintenance scheme for a deteriorating unit with a stochastic degradation process with independent and stationary increments and for which the parameters are uncertain. This model and resulting maintenance plans offers some distinct benefits compared to prior research because the uncertainty of the degradation process is accommodated by a Bayesian approach and two new safety constraints have been applied to the problem: (1) with a given subjective probability (degree of belief), the limiting relative frequency of one or more failures during a fixed time interval is bounded; or (2) the subjective probability of one or more failures during a fixed time interval is bounded. In the model, the parameter(s) of a condition-based inspection scheduling function and a preventive replacement threshold are jointly optimized upon each replacement and inspection such as to minimize the expected long run cost per unit of time, but also considering one of the specified safety constraints. A numerical example is included to illustrate the effect of imposing each of the two different safety constraints.

  5. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  6. Maintenance contract strategies for reliability at minimum cost

    International Nuclear Information System (INIS)

    Gamman, E.

    1992-01-01

    The conference paper deals with offshore contract philosophies concerning maintenance. The main philosophies of the contract should be built on the following key success factors: Safe operations and correct quality must be sustained at any time; the maintenance contractor should be viewed as a cooperation partner, not only as a supplier; optimum exploitation of learning curve effects and economies of scale. The paper illustrates the importance of each of them in a contract context with a few recommendations

  7. Lead particle size and its association with firing conditions and range maintenance: implications for treatment.

    Science.gov (United States)

    Dermatas, Dimitris; Chrysochoou, Maria

    2007-08-01

    Six firing range soils were analyzed, representing different environments, firing conditions, and maintenance practices. The particle size distribution and lead (Pb) concentration in each soil fraction were determined for samples obtained from the backstop berms. The main factors that were found to influence Pb fragment size were the type of soil used to construct the berms and the type of weapon fired. The firing of high velocity weapons, i.e., rifles, onto highly angular soils induced significant fragmentation of the bullets and/or pulverization of the soil itself. This resulted in the accumulation of Pb in the finer soil fractions and the spread of Pb contamination beyond the vicinity of the backstop berm. Conversely, the use of clay as backstop and the use of low velocity pistols proved to be favorable for soil clean-up and range maintenance, since Pb was mainly present as large metallic fragments that can be recovered by a simple screening process. Other factors that played important roles in Pb particle size distribution were soil chemistry, firing distance, and maintenance practices, such as the use of water spray for dust suppression and deflectors prior to impact. Overall, coarse Pb particles provide much easier and more cost-effective maintenance, soil clean-up, and remediation via physical separation. Fine Pb particles release Pb more easily, pose an airborne Pb hazard, and require the application of stabilization/solidification treatment methods. Thus, to ensure sustainable firing range operations by means of cost-effective design, maintenance, and clean-up, especially when high velocity weapons are used, the above mentioned factors should be carefully considered.

  8. ATTENTION MAINTENANCE IN NOVICE DRIVERS: ASSESSMENT AND TRAINING

    OpenAIRE

    Pradhan, Anuj; Masserang, Kathleen M.; Divekar, Gautam; Reagan, Ian; Thomas, F. Dennis; Blomberg, Richard; Pollatsek, Alexander; Fisher, Donald

    2009-01-01

    All programs assessing attention maintenance inside the vehicle have required eye trackers and either a driving simulator or a specially equipped field vehicle. Ideally, one would like a way to assess attention maintenance that could be implemented on a desktop PC. Additionally, one would like to have a program that could be used to train novice drivers to maintain their attention more safely on the forward roadway. An experiment was run (a) to determine whether a program FOCAL (Focused Conce...

  9. Prognostics and Condition Based Maintenance: A New Approach to Precursive Metrics

    International Nuclear Information System (INIS)

    Jarrell, Donald B.; Sisk, Daniel R.; Bond, Leonard J.

    2002-01-01

    Scientists at the Pacific Northwest National Laboratory (PNNL) have examined the necessity for understanding and controlling the aging process of both safety-specific plant components and the infrastructure that supports these processes. In this paper we examine the preliminary development of aging precursor metrics and their correlation with degradation rate and projected machine failure. Degradation specific correlations are currently being developed at PNNL that will allow accurate physics-based diagnostic and prognostic determinations to be derived from a new view of condition based maintenance. This view, founded in root cause analysis, is focused on quantifying the primary stressor(s) responsible for degradation in the component of interest. The derivative relationship between the performance, degradation and the underlying stressor set is used to gain a first principles approach to prognostic determinations. The assumptions used for the design basis of process equipment have always been as much art as science and for this reason have been misused or relegated into obscurity in all but the nuclear industry. The ability to successfully link degradation and expected equipment life to stressor intensity level is valuable in that it quantifies the degree of machine stress for a given production level. This allows two major improvements in the O and M of process machinery: (1) the actual versus intended machine environment can be understood and brought into much better alignment, and (2) the end goal can define operations and maintenance strategies in terms of life cycle and economic management of plant assets. A holistic infrastructure approach, as applied through a CBM framework, will allow intelligent, automated diagnostic and prognostic programs to provide O and M practitioners with an understanding of the condition of their machinery today and an assurance of its operational state tomorrow

  10. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  11. Improving the TRIGA facility maintenance by predictive maintenance techniques

    International Nuclear Information System (INIS)

    Preda, M.; Sabau, C.; Barbalata, E.

    1997-01-01

    This work deals with the specific operation of equipment in radioactive environment or in conditions allowing radioactive contamination. The requirements of remote operation ensuring the operators' protection are presented. Also, the requirements of international standards issued by IAEA-Vienna are reviewed. The organizational withdraws of the maintenance activities, based on the standards and maintenance and repair directives still in force, are shown. It is emphasized the fact that this type of maintenance was adequate to a given level of technical development, characteristic for pre-computerized industry, but, at present, it is obsolete and uneconomic both in utilization and maintenance. Such a system constitutes already a burden hindering the efforts of maximizing the availability, maintenance, prolongation the service life of equipment and utilities, finally, of increasing the efficiency of complex installations. Moreover, the predictive maintenance techniques are strongly requested by the character of radioactive installations precluding the direct access in given zones (a potential risk of irradiation or radioactive contamination) of installations during operation. The results obtained by applying the predictive maintenance techniques in the operation of the double circuit irradiation loop, used in the TRIGA reactors, are presented

  12. A Self-Evaluation Tool for Development of Maintenance Personnel's Competences

    International Nuclear Information System (INIS)

    Piirto, A.; Paajanen, P.; Kantola, J.; Vanharanta, H.

    2007-01-01

    Teollisuuden Voima Oy (TVO) operates Olkiluoto nuclear power plant, which consists of twin 840 MWe BWR units. The first nuclear power plant unit, Olkiluoto 1, was connected to the national grid in September 1978 and the second almost identical unit, Olkiluoto 2, in February 1980. The construction of the third 1600 MWe PWR unit, Olkiluoto 3, was started in the spring 2005. The commercial operation of the new unit will start in 2009. The operation results of TVO's nuclear power plant units have been among the best ones in the world. The operational success is primary attributable to the early elimination of technical problems and preparation for defects beforehand. Also development of outage planning, maintenance methods and a low rate of disturbances have been very significant in achieving good operation results. TVO's long-term goals in operation and maintenance are: - keeping the load factor over 90 % and avoiding operational disturbances; - keeping the technical condition of the plant units 'as new'; - continuous learning and development of operation and maintenance functions; - decreasing the production costs. These goals also set requirements for maintenance personnel's competences. The high-grade competence of maintenance personnel has an effect on safe and reliable nuclear power plant operation. However, as a concept, safety is not always easy to define. A high level of safety is the result of the complex interaction of good design, operational safety and human performance: A set of indicators which are designed to monitor all aspects of operational safety performance are needed to form a total picture of the safe plant operation. In the framework six key areas of improvement of nuclear safety are defined. These key areas of improvement are based on the vision that the plant operates with low risk. Implementation of the actions will result in direct and permanent positive impact on plant nuclear safety and safety culture. The information gained from

  13. Towards Safe Robotic Surgical Systems

    DEFF Research Database (Denmark)

    Sloth, Christoffer; Wisniewski, Rafael

    2015-01-01

    a controller for motion compensation in beating-heart surgery, and prove that it is safe, i.e., the surgical tool is kept within an allowable distance and orientation of the heart. We solve the problem by simultaneously finding a control law and a barrier function. The motion compensation system is simulated...... from several initial conditions to demonstrate that the designed control system is safe for every admissible initial condition....

  14. PREVENTIVE MAINTENANCE. HONEYWELL PLANNING GUIDE.

    Science.gov (United States)

    Honeywell, Inc., Minneapolis, Minn.

    THIS HONEYWELL PAMPHLET DISCUSSES SOME ASPECTS OF PREVENTIVE MAINTENANCE OF AUTOMATIC CONTROLS, HEATING, VENTILATING, AND AIR CONDITIONING, AND COMPARES IN-PLANT WITH CONTRACT SERVICE, CONCLUDING THAT CONTRACT SERVICE IS PREFERABLE AND DESCRIBING A NUMBER OF MAINTENANCE PLANS WHICH THEY FURNISH. PREVENTIVE MAINTENANCE PROVIDES--(1) MORE EFFICIENT…

  15. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  16. Condition-Based Maintenance Strategy for Production Systems Generating Environmental Damage

    Directory of Open Access Journals (Sweden)

    L. Tlili

    2015-01-01

    Full Text Available We consider production systems which generate damage to environment as they get older and degrade. The system is submitted to inspections to assess the generated environmental damage. The inspections can be periodic or nonperiodic. In case an inspection reveals that the environmental degradation level has exceeded the critical level U, the system is considered in an advanced deterioration state and will have generated significant environmental damage. A corrective maintenance action is then performed to renew the system and clean the environment and a penalty has to be paid. In order to prevent such an undesirable situation, a lower threshold level L is considered to trigger a preventive maintenance action to bring back the system to a state as good as new at a lower cost and without paying the penalty. Two inspection policies are considered (periodic and nonperiodic. For each one of them, a mathematical model and a numerical procedure are developed to determine simultaneously the preventive maintenance (PM threshold L∗ and the inspection sequence which minimize the average long-run cost per time unit. Numerical calculations are performed to illustrate the proposed maintenance policies and highlight their main characteristics with respect to relevant input parameters.

  17. Chernobyl new safe confinement

    International Nuclear Information System (INIS)

    Dodd, L.

    2011-01-01

    The author presents the new safe confinement that will be commissioned at Unit 4 of the Chernobyl NPP in 2015. The confinement will ensure that Chernobyl Unit 4 will be placed in an environmentally safe condition for at least next 100 years. The article highlights the current work status, future perspectives and the feasibility of confinement concept [ru

  18. Reliability centered maintenance pilot system implementation 241-AP-tank farm primary ventilation system final report

    International Nuclear Information System (INIS)

    MOORE TL

    2001-01-01

    When the Hanford Site Tank Farms' mission was safe storage of radioactive waste in underground storage tanks, maintenance activities focused on time-based preventive maintenance. Tank Farms' new mission to deliver waste to a vitrification plant where the waste will be processed into a form suitable for permanent storage requires a more efficient and proactive approach to maintenance. Systems must be maintained to ensure that they are operational and available to support waste feed delivery on schedule with a minimum of unplanned outages. This report describes the Reliability Centered Maintenance (RCM) pilot system that was implemented in the 241-AP Tank Farm Primary Ventilation System under PI-ORP-009 of the contract between the U.S. Department of Energy, Office of River Protection and CH2M HILL Hanford Group Inc. (CHG). The RCM analytical techniques focus on monitoring the condition of operating systems to predict equipment failures so that maintenance activities can be completed in time to prevent or mitigate unplanned equipment outages. This approach allows maintenance activities to be managed with minimal impact on plant operations. The pilot demonstration provided an opportunity for CHG staff-training in RCM principles and tailoring of the RCM approach to the Hanford Tank Farms' unique needs. This report details the implementation of RCM on a pilot system in Tank Farms

  19. Ageing Management Based Maintenance at ETRR-II

    Energy Technology Data Exchange (ETDEWEB)

    Kamoon, A.; Ali, A., E-mail: akamoun2004@yahoo.com [Inshas Nuclear Research Centre, Egyptian Atomic Energy Authority (EAEA), Cairo (Egypt)

    2014-08-15

    The second research reactor of Egypt, ETRR-II, is an open pool type multi-purpose reactor of 22 MW that has been in operation since 1998. The main purposes of ETRR-II are the production of radioisotopes, personnel training, research and development. Ageing management of ETRR-II is based on the maintenance programme. This programme was planned to have a proactive maintenance strategy that mainly depends on adequate preventive and predictive maintenance. Screening of SSCs is based on safety classes, needs and quality levels. The operation condition and maintenance history are the basis to assess the level of degradation. The ultimate aim of the maintenance team is to perform adequate maintenance work only when it is really necessary. The objectives of the ageing management based maintenance are to maintain and improve equipment availability, confirm compliance with operational limits and conditions, and detect and correct any abnormal condition that might affect reactor safety. The programme also helps to detect trends in ageing so that a plan for mitigating ageing effects can be prepared and implemented. Reactor service conditions are monitored through many parameters and conditions such as conductivity and pH of coolant water, water radiochemical analysis, thermal and hydraulic parameters, a leak detection system, corrosion rate of piping, vibration level of rotating equipment and control rod drop time.

  20. Advanced maintenance strategies for power plant operators--introducing inter-plant life cycle management

    International Nuclear Information System (INIS)

    Graeber, Ulrich

    2004-01-01

    One of the most important goals of competing power plant operators is to ensure safe operation of their plants, characterized by maximum availability throughout the entire life cycle and minimized specific generating costs. One parameter crucial to the total price of electricity--and one that can be actively influenced by the power plant operators--is maintenance. Up to 30% of all electricity generating costs accrue from maintenance. In the past years maintenance measures have been optimized particularly by the application and continuing development of testing and diagnostic techniques, by the increased level of system and component automation as well as more efficient organization structures. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. But the risks connected to reliability, availability and safety need to be analyzed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realized. The systematic application of condition-based maintenance and the implementation of structured life cycle management are essential requirements. An inter-plant approach is recommended to make a quick implementation of maintenance optimization potentials possible. Plant-specific improvement potentials can be established with the help of a best-practice comparison, and measures and priorities can be defined for realizing them. Creating an inter-plant database will allow experience and findings to be analyzed quickly and efficiently by experts and made available to all participants on a neutral platform. Despite--or maybe owing to--the increasingly competitive marketplace, a sustained reduction in the maintenance costs of power plant operators can only be achieved through a structured, inter-plant exchange of experience. The ZES offers the industry a suitable platform for cooperation with its 'Condition-Based Maintenance' research focus. The introduction

  1. Operation and maintenance requirements of system design bases

    International Nuclear Information System (INIS)

    Banerjee, A.K.; Hanley, N.E.

    1989-01-01

    All system designs make assumptions about system operation testing, inspection, and maintenance. Existing industry codes and standards explicitly address design requirements of new systems, while issues related to system and plant reliability, life, design margins, effects of service conditions, operation, maintenance, etc., usually are implicit. However, system/component design documents of existing power plants often address the code requirements without considering the operation, maintenance, inspection, and testing (OMIT) requirements. The nuclear industry is expending major efforts at most nuclear power plants to reassemble and/or reconstitute system design bases. Stone ampersand Webster Engineering Corporation (SWEC) recently addressed the OMIT requirements of system/component design as an integral part of a utility's preventive maintenance program. For each component, SWEC reviewed vendor recommendations, NPRDS data/industry experience, the existing maintenance program, component service conditions, and actual plant experience. A maintenance program that considers component service conditions and plant experience ensures a connection between maintenance and design basis. Root cause analysis of failure and engineering evaluation of service condition are part of the program. System/component OMIT requirements also are compared against system design, service condition, degradation mechanism, etc., through system/component life-cycle evaluation

  2. Maintenance Issues in Long Term Operation of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Contri, P.; Bieth, M.; Rieg, C.

    2006-01-01

    Due to current social and economical framework, in last years many nuclear power plant owners started a program for the Long Term Operation (LTO)/PLEX (Plant Life Extension) of their older nuclear facilities. This process has many nuclear safety implications, other than strategic and political ones. The need for tailoring the available safety assessment tools to such applications has become urgent in recent years and triggered many research actions. The review of regular maintenance and ageing management programs are tools widely used in LTO/PLEX context in many Countries. However, most of these tools are rather general and in many cases they need reshaping in an LTO/PLEX framework before application, with focus to the safety implications of the LTO/PLEX. Many Countries and plants radically modified their maintenance rules towards a condition based approach as a precondition for the implementation of LTO/PLEX programs. In 2004 a network of European Organisations operating Nuclear Power Plants, SENUF, under the coordination of the JRC-IE, carried out an extensive questionnaire on maintenance practice in their facilities aiming at capturing the aspects of the maintenance programs where research is mostly needed. This paper uses some results of the questionnaire, which was not oriented to LTO/PLEX, to draw some conclusions on how the current maintenance programs could support a potential LTO/PLEX, among the other programs running at NPPs. In this sense, it is spin-off of the SENUF WG on maintenance. The paper aims at identifying the technical attributes of the maintenance programs more directly affecting the decision for a long-term safe operation of a nuclear facility, the issues related to their implementation and safety review. The paper includes an analysis of the questionnaire circulated among the SENUF participants and a discussion on the implications of optimised maintenance programs in existing plants. Some examples at WWER plants taken by sources other than

  3. Laboratory equipment maintenance contracts.

    Science.gov (United States)

    Boudreau, D A; Scheer, W D; Catrou, P G

    1985-12-01

    The increasing level of technical sophistication and complexity found in clinical laboratory instrumentation today more than ever demands careful attention to maintenance service needs. The time-worn caution for careful definition of requirements for acquisition of a system should also carry over to acquisition of maintenance service. Guidelines are presented for specifications of terms and conditions for maintenance service from the perspective of the laboratorian in the automated clinical laboratory.

  4. Excellence through maintenance mastering

    International Nuclear Information System (INIS)

    Lamarche, M.; Guillot, M.; Monier, M.

    1987-01-01

    To improve the overall availability factor of nuclear power plants you have to cut either the forced outage role and the planned outage time or you need to reduce simultaneously the failures and the efforts devoted to avoiding them. Among other results, this goal leads to a decrease in the number of real or anticipated problems. Electricite de France policy, in this matter, is to focus on decreasing the compoents' maintenance needs through a comprehensive modification program, targeted to eliminating the weak points as revealed by the operation. Thereby one may reach, for simple equipment, a nearly maintenance-free condition in which the only maintenance needed is surveillance, which provides assurance that everything is operating properly. A good example of this type of equipment is the family of static components, drums, and pipes whose corrective maintenance is almost nil when their initial condition is good

  5. A method for accounting for maintenance costs in flux balance analysis improves the prediction of plant cell metabolic phenotypes under stress conditions.

    Science.gov (United States)

    Cheung, C Y Maurice; Williams, Thomas C R; Poolman, Mark G; Fell, David A; Ratcliffe, R George; Sweetlove, Lee J

    2013-09-01

    Flux balance models of metabolism generally utilize synthesis of biomass as the main determinant of intracellular fluxes. However, the biomass constraint alone is not sufficient to predict realistic fluxes in central heterotrophic metabolism of plant cells because of the major demand on the energy budget due to transport costs and cell maintenance. This major limitation can be addressed by incorporating transport steps into the metabolic model and by implementing a procedure that uses Pareto optimality analysis to explore the trade-off between ATP and NADPH production for maintenance. This leads to a method for predicting cell maintenance costs on the basis of the measured flux ratio between the oxidative steps of the oxidative pentose phosphate pathway and glycolysis. We show that accounting for transport and maintenance costs substantially improves the accuracy of fluxes predicted from a flux balance model of heterotrophic Arabidopsis cells in culture, irrespective of the objective function used in the analysis. Moreover, when the new method was applied to cells under control, elevated temperature and hyper-osmotic conditions, only elevated temperature led to a substantial increase in cell maintenance costs. It is concluded that the hyper-osmotic conditions tested did not impose a metabolic stress, in as much as the metabolic network is not forced to devote more resources to cell maintenance. © 2013 The Authors The Plant Journal © 2013 John Wiley & Sons Ltd.

  6. 77 FR 12059 - Using Innovative Technologies and Other Conditions of Safe Use To Expand Which Drug Products Can...

    Science.gov (United States)

    2012-02-28

    ...] Using Innovative Technologies and Other Conditions of Safe Use To Expand Which Drug Products Can Be... over-the- counter or OTC products) can be purchased by consumers in pharmacies, supermarkets, and other retail establishments without the need for a prescription. Currently, consumers can purchase...

  7. Regulatory oversight of maintenance activities at nuclear power plants

    International Nuclear Information System (INIS)

    Pape, M.

    1997-01-01

    Regulation of nuclear safety in the UK is based on monitoring of compliance with licence conditions. This paper discusses legislation aspects, license conditions, license requirements for maintenance and maintenance activities in the UK. It also addresses the regulator utility interaction, the regulatory inspection of maintenance and the trends in maintenance. (author)

  8. Maintenance risk management in Dayabay nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Tong Jiejuan

    2005-01-01

    The importance of proper maintenance to safe and reliable nuclear plant operation has long been recognized by the nuclear utility and regulatory body. This paper presents a process of maintenance risk management developed for a Chinese Nuclear Power Plant (NPP). The process includes three phases: (I) long term maintenance plan risk management, (II) monthly maintenance plan risk management, and (III) detailed risk management for high risk configuration. A risk matrix is developed for phase I whose purpose is to provide a rough guide for risk management in the making of the annual maintenance plan. For Phase II and Phase III, a software tool named Maintenance- Risk-Monitor is developed based on the internal initiating event, level 1 PSA model. The results of Phase II are the risk information of the all plant configurations caused by the unavailability of the components included the monthly maintenance plan. When the increase of core damage frequency (CDF) or the incremental core damage probability (ICDP) of a configuration is higher than the corresponding thresholds, Phase III is needed for this high risk configuration to get the useful information such as risk-importance components, human actions and initial events, from which appropriate preventive measurements could be derived. It is hoped that the provided process of maintenance risk management, together with the developed software tool, could facilitate the maintenance activities in the NPPs of China. (authors)

  9. Bayesian Based Diagnostic Model for Condition Based Maintenance of Offshore Wind Farms

    Directory of Open Access Journals (Sweden)

    Masoud Asgarpour

    2018-01-01

    Full Text Available Operation and maintenance costs are a major contributor to the Levelized Cost of Energy for electricity produced by offshore wind and can be significantly reduced if existing corrective actions are performed as efficiently as possible and if future corrective actions are avoided by performing sufficient preventive actions. This paper presents an applied and generic diagnostic model for fault detection and condition based maintenance of offshore wind components. The diagnostic model is based on two probabilistic matrices; first, a confidence matrix, representing the probability of detection using each fault detection method, and second, a diagnosis matrix, representing the individual outcome of each fault detection method. Once the confidence and diagnosis matrices of a component are defined, the individual diagnoses of each fault detection method are combined into a final verdict on the fault state of that component. Furthermore, this paper introduces a Bayesian updating model based on observations collected by inspections to decrease the uncertainty of initial confidence matrix. The framework and implementation of the presented diagnostic model are further explained within a case study for a wind turbine component based on vibration, temperature, and oil particle fault detection methods. The last part of the paper will have a discussion of the case study results and present conclusions.

  10. AN EVALUATION OF CONDITION MONITORING TECHNIQUES FOR LOW-VOLTAGE ELECTRIC CABLES

    International Nuclear Information System (INIS)

    LOFARO, R.J.; GROVE, E.; SOO, P.

    2000-01-01

    Aging of systems and components in nuclear power plants is a well known occurrence that must be managed to ensure the continued safe operation of these plants. Much of the degradation due to aging is controlled through periodic maintenance and/or component replacement. However, there are components that do not receive periodic maintenance or monitoring once they are installed; electric cables are such a component. To provide a means of monitoring the condition of electric cables, research is ongoing to evaluate promising condition monitoring (CM) techniques that can be used in situ to monitor cable condition and predict remaining life. While several techniques are promising, each has limitations that must be considered in its application. This paper discusses the theory behind several of the promising cable CM techniques being studied, along with their effectiveness for monitoring aging degradation in typical cable insulation materials, such as cross-linked polyethylene and ethylene propylene rubber. Successes and limitations of each technique are also presented

  11. Cellular automata model for traffic flow with safe driving conditions

    International Nuclear Information System (INIS)

    Lárraga María Elena; Alvarez-Icaza Luis

    2014-01-01

    In this paper, a recently introduced cellular automata (CA) model is used for a statistical analysis of the inner microscopic structure of synchronized traffic flow. The analysis focuses on the formation and dissolution of clusters or platoons of vehicles, as the mechanism that causes the presence of this synchronized traffic state with a high flow. This platoon formation is one of the most interesting phenomena observed in traffic flows and plays an important role both in manual and automated highway systems (AHS). Simulation results, obtained from a single-lane system under periodic boundary conditions indicate that in the density region where the synchronized state is observed, most vehicles travel together in platoons with approximately the same speed and small spatial distances. The examination of velocity variations and individual vehicle gaps shows that the flow corresponding to the synchronized state is stable, safe and highly correlated. Moreover, results indicate that the observed platoon formation in real traffic is reproduced in simulations by the relation between vehicle headway and velocity that is embedded in the dynamics definition of the CA model. (general)

  12. Management of maintenance activities at Cernavoda NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Urjan, R.; Marinescu, S.; Corlan, L.

    2000-01-01

    After the Construction and Commissioning phases are over, the safety and economic performances of each nuclear unit are determined by the quality of its operation as well as by the combination of reliability and availability of the systems consisting the whole unit. Therefore, the value of a good maintenance program in making a safe and profitable operation is now widely recognized; all stations operating with excellent performance have well-defined policies and effectively administered programs to govern maintenance activities. The Cernavoda maintenance optimization initiative is derived from good practices suggested by such recognized bodies as the IAEA, INPO and EPRI. It should be noted that the program is evolving at this time and that this paper is an attempt to summarize the myriad of activities and plans required to finally implement the maintenance program. Although many of the elements of the program are in place, many are in various stages of completion. The main components of the program (policy's objectives, strategies used, specific subprograms, maintenance plans and their integration) are presented in brief along with the performance indicators used to assess the effectiveness of the program and maintenance activities. The new programs intended to be developed are also specified, as well as the main comments and recommendations received from IAEA experts. (author)

  13. The development of a computerized maintenance management system at the New York State Department of Environmental Conservation

    Science.gov (United States)

    Francis V. Riedy; Daniel Skelton

    1998-01-01

    Every asset, old or new, requires maintenance. Buildings, bridges, roads, dams, utilities and grounds; each requires some degree of maintenance to ensure long life cycles and safe operation. Maintenance is science, art and philosophy. It is science since its execution ultimately relies on most of all the sciences; it is art because seemingly identical problems...

  14. Proficiency evaluation of maintenance personnel: Training equivalency determination

    International Nuclear Information System (INIS)

    Price, W.J.

    1991-01-01

    The nuclear industry has recognized the importance of safe, quality, productive maintenance practices and has taken a number of initiatives that have generally improved maintenance programs. Because proficient maintenance practices are critical to plant safety and reliability, most plants have also recognized the need for reliable, valid testing techniques that demonstrate and assure the competence of their maintenance personnel. Until now, resource demands were too great to develop in-plant testing programs. In the past, maintenance supervisors have exempted personnel from training, using informal judgment of the employees' previous training and experience and informal observation of the employee on the job. While this procedure may have some degree of validity, it fails to provide the documentation for training equivalency that is required to satisfy the US Nuclear Regulatory Commission (NRC) regulations and Institute of Nuclear Power Operations (INPO) guidelines. To assess and demonstrate the proficiency levels of personnel, Calvert Cliffs needed to establish an objective, reliable, time-saving, and valid system to evaluate the competency levels of personnel. This was done in a joint effort with the Electric Power Research Institute

  15. The present condition of forest roads as a result of their past maintenance

    OpenAIRE

    Hribernik, Boštjan; Potočnik, Igor

    2006-01-01

    Forest roads are built for forest management purposes, to which planning of their use and maintenance is adapted. The increasing importance of non-forestry use of forest roads leads to higher maintenance standard, which by formed maintenance system causes permanent shortage of funds. Higher maintenance costs occur due to the past forest roads construction characteristics, which gave priority to quick opening of villages and farms, on the account of building quality. Other funds expenditure re...

  16. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  17. Advisory Material for the IAEA Regulations for the Safe Transport of Radioactive Material. Safety Guide (Spanish Edition)

    International Nuclear Information System (INIS)

    2010-01-01

    This Safety Guide provides recommendations on achieving and demonstrating compliance with IAEA Safety Standards Series No. TS-R-1, Regulations for the Safe Transport of Radioactive Material, 2005 Edition, establishing safety requirements to be applied to the national and international transport of radioactive material. Transport is deemed to comprise all operations and conditions associated with and involved in the movement of radioactive material; these include the design, fabrication and maintenance of packaging, and the preparation, consigning, handling, carriage, storage in transit and receipt at the final destination of packages. This publication supersedes IAEA Safety Series No. TS-G-1.1, 2002 Edition

  18. Context-Dependent Prognostics and Health Assessment: A Condition-Based Maintenance Approach That Supports Mission Compliance

    Energy Technology Data Exchange (ETDEWEB)

    Allgood, G.O.; Kercel, S.W.

    1999-04-19

    In today's manufacturing environment, plants, systems, and equipment are being asked to perform at levels not thought possible a decade ago. The intent is to improve process operations and equipment reliability, availability, and maintainability without costly upgrades. Of course these gains must be achieved without impacting operational performance. Downsizing is also taking its toll on operations. Loss of personnel, particularly those who represent the corporate history, is depleting US industries of their valuable experiential base which has been relied on so heavily in the past. These realizations are causing companies to rethink their condition-based maintenance policies by moving away from reacting to equipment problems to taking a proactive approach by anticipating needs based on market and customer requirements. This paper describes a different approach to condition-based maintenance-context-dependent prognostics and health assessment. This diagnostic capability is developed around a context-dependent model that provides a capability to anticipate impending failures and determine machine performance over a protracted period of time. This prognostic capability links operational requirements to an economic performance model. In this context, a system may provide 100% operability with less than 100% functionality. This paradigm is used to facilitate optimal logistic supply and support.

  19. Improving nuclear power plant reliability through predictive maintenance

    International Nuclear Information System (INIS)

    Geilhausen, R.; Kunze, U.

    1996-01-01

    Maintenance strategies can be assigned to one of three categories: failure maintenance, periodic maintenance or condition-oriented maintenance. The optimum maintenance scheme can be selected on the basis of a cost-benefit analysis but the safety of life and limb or the political climate for NPP can hardly expressed in numbers. The implementation of preventive maintenance needs two preconditions: high-performance instrumentation in the form of stationary and mobile monitoring systems for the determination of the condition of the nuclear power plant components and provision of a tool that can handle both the organization of the work and the evaluation of the results obtained. (authors)

  20. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Sculthorpe, Barruy R.

    2002-01-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  1. Condition-based dynamic maintenance operations planning and grouping. Application to commercial heavy vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Bouvard, K., E-mail: keomany.bouvard@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France); Artus, S., E-mail: samuel.artus@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Berenguer, C., E-mail: christophe.berenguer@utt.f [Universite de technologie de Troyes - Institut Charles Delaunay and UMR CNRS 6279 - 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Cocquempot, V., E-mail: vincent.cocquempot@univ-lille1.f [Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France)

    2011-06-15

    This paper aims at presenting a method to optimize the maintenance planning for a commercial heavy vehicle. Such a vehicle may be considered as a multi-components system. Grouping maintenance operations related to each component reduces the global maintenance cost of the system. Classically, the optimization problem is solved using a priori reliability characteristics of components. Two types of methods may be used, i.e. static or dynamic methods. Static methods provide a fixed maintenance planning, whereas dynamic methods redefine the groups of maintenance operations at each decision time. Dynamic procedures can incorporate component information such as component states or detected failures. For deteriorating systems, reliability characteristics of each component may be estimated thanks to deterioration models and may be updated when a degradation measure is available. This additional information on degradation features allows to better follow the real state of each component and to improve the maintenance planning.

  2. TPX remote maintenance and shielding

    International Nuclear Information System (INIS)

    Rennich, M.J.; Nelson, B.E.

    1994-01-01

    The Tokamak Physics Experiment machine design incorporates comprehensive planning for efficient and safe component maintenance. Three programmatic decisions have been made to insure the successful implementation of this objective. First, the tokamak incorporates radiation shielding to reduce activation of components and limit the dose rate to personnel working on the outside of the machine. This allows most of the ex-vessel equipment to be maintained through conventional ''hands-on'' procedures. Second, to the maximum extent possible, low activation materials will be used inside the shielding volume. This resulted in the selection of Titanium (Ti-6Al-4V) for the vacuum vessel and PFC structures. The third decision stipulated that the primary in-vessel components will be replaced or repaired via remote maintenance tools specifically provided for the task. The component designers have been given the responsibility of incorporating maintenance design and for proving the maintainability of the design concepts in full-scale mockup tests prior to the initiation of final fabrication. Remote maintenance of the TPX machine is facilitated by general purpose tools provided by a special purpose design team. Major tools will include an in-vessel transporter, a vessel transfer system and a large component transfer container. In addition, tools such as manipulators and remotely operable impact wrenches will be made available to the component designers by this group. Maintenance systems will also provide the necessary controls for this equipment

  3. Curiosity's Autonomous Surface Safing Behavior Design

    Science.gov (United States)

    Neilson, Tracy A.; Manning, Robert M.

    2013-01-01

    The safing routines on all robotic deep-space vehicles are designed to put the vehicle in a power and thermally safe configuration, enabling communication with the mission operators on Earth. Achieving this goal is made a little more difficult on Curiosity because the power requirements for the core avionics and the telecommunication equipment exceed the capability of the single power source, the Multi-Mission Radioisotope Thermoelectric Generator. This drove the system design to create an operational mode, called "sleep mode", where the vehicle turns off most of the loads in order to charge the two Li-ion batteries. The system must keep the vehicle safe from over-heat and under-heat conditions, battery cell failures, under-voltage conditions, and clock failures, both while the computer is running and while the system is sleeping. The other goal of a safing routine is to communicate. On most spacecraft, this simply involves turning on the receiver and transmitter continuously. For Curiosity, Earth is above the horizon only a part of the day for direct communication to the Earth, and the orbiter overpass opportunities only occur a few times a day. The design must robustly place the Rover in a communicable condition at the correct time. This paper discusses Curiosity's autonomous safing behavior and describes how the vehicle remains power and thermally safe while sleeping, as well as a description of how the Rover communicates with the orbiters and Earth at specific times.

  4. Routine check and annual maintenance for industrial radiography gamma projector

    International Nuclear Information System (INIS)

    Shaharudin Sayuti; Abdul Nassir Ibrahim; Sukhri Ahmad; Arshad Yassin; Mohd Junaidi Jaapar; Khairul Anuar Mohd Salleh; Abdul Razak Hamzah

    2009-04-01

    The main objective of this paper is to share some experience pertaining to gamma projector maintenance programme. In Malaysia there are more than 100 gamma projectors, which need to be maintenance annually. Most of these projectors are Tech-Ops 660 series portable gamma radiography systems, which are used primarily for industrial radiography. The portability feature of the system provides both a safe means of transporting the radioactive source and operating flexibility, particularly useful in areas where access is limited. Generally, the national authorised service centre carries out the annual inspection of this system. In Malaysia, Malaysian Nuclear Agency has been recognised as the National Gamma Projector Maintenance Centre by the Atomic Energy Licensing Board (AELB). In this paper, a brief review of the design and operation is included in the discussion of the maintenance procedure, limitations and improvements of the gamma projector maintenance programme. (author)

  5. Development of a prototype system for prediction of the group error at the maintenance work

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuuko

    2001-01-01

    This paper described on development and performance evaluation of a prototype system for prediction of the group error at the maintenance work. The results so far are as follows. (1) When a user inputs the existence and the grade of the feature factor of the maintenance work as a prediction object, an organization and an organization factor and a group PSF put into the system. The maintenance group error to target can be predicted through the prediction model which consists of a class of seven stages. (2) This system by utilizing the information on a prediction result database, it can be use not only for prediction of a maintenance group but for various safe Activity, such as KYT(Kiken Yochi Training) and TBM(Tool Box Meeting). (3) This system predicts a cooperation error at highest rate, and subsequently. Predicts the detection error at a high rate. and to the decision-making. Error, the transfer error and the state cognitive error, and state error, it has the characteristics predicted at almost same rate. (4) if it has full knowledge even if the feature, such as the enforcement conditions of maintenance work, and organization, even if the user has neither the knowledge about a human factor, users experience, anyone of this system is slight about the extent, generating of a maintenance group error made difficult from the former logically and systematically, it can predict with business time for about 15 minutes. (author)

  6. A standardized and safe method of sterile field maintenance during intra-operative horizontal plane fluoroscopy

    Directory of Open Access Journals (Sweden)

    Kaska Serge C

    2010-12-01

    Full Text Available Abstract Background Intra-operative fluoroscopy for orthopaedic procedures frequently involves imaging in the horizontal plane, which requires the lower portion of the C-arm (x-ray tube to be rotated from an unsterile zone (beneath the table into the sterile field. To protect the integrity of the sterile field the C-arm must be draped repeatedly throughout the surgical case. The current, un-standardized, practice employs draping procedures which violate the Association of peri-Operative Registered Nurses (AORN Standards and Recommended Practices, waste time and material, and pose an increased risk for surgical site infection. Presentation of the hypothesis Use of a novel sterile C-arm drape (C-armor that maintains the integrity of the sterile field, will improve operating room efficiency and reduce surgical site infection risk factors. This reduction in risk factors may potentially reduce surgical site infections in orthopaedic surgical cases requiring repeated horizontal x-ray imaging. Testing the Hypothesis Savings in time and material and the reduction in surgical site infection risk factors afforded by using C-armor are intuitive to those skilled in the practice of orthopaedic surgery. Testing for a reduction in the number of microorganisms introduced to the surgical site by improved C-arm draping would be challenging due to the multiple confounding factors during a surgical operation. Determination of an absolute reduction in surgical site infections may be possible, but will require accounting for many confounding variables and a large study sample in order to achieve statistical significance. Implications of the Hypothesis Improved intraoperative workflow, healthcare savings and a reduction in surgical site infection risk factors will be achieved by utilizing a standardized and safe method of sterile field maintenance during intra-operative horizontal plane fluoroscopy.

  7. Simulation of machine-maintenance training in virtual environment

    International Nuclear Information System (INIS)

    Yoshikawa, Hidekazu; Tezuka, Tetsuo; Kashiwa, Ken-ichiro; Ishii, Hirotake

    1997-01-01

    The periodical inspection of nuclear power plants needs a lot of workforces with a high degree of technical skill for the maintenance of various sorts of machines. Therefore, a new type of maintenance training system is required, where trainees can get training safely, easily and effectively. In this study we developed a training simulation system for disassembling a check valve in virtual environment (VE). The features of this system are as follows: Firstly, the trainees can execute tasks even in wrong order, and can experience the resultant conditions. In order to realize this environment, we developed a new Petri-net model for representing the objects' states in VE. This Petri-net model has several original characteristics, which make it easier to manage the change of the objects' states. Furthermore, we made a support system for constructing the Petri-net model of machine-disassembling training, because the Petri-net model is apt to become of large size. The effectiveness of this support system is shown through the system development. Secondly, this system can perform appropriate tasks to be done next in VE whenever the trainee wants even after some mistakes have been made. The effectiveness of this function has also been confirmed by experiments. (author)

  8. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  9. Using systematic aging assessments to improve effectiveness of plant maintenance programs

    International Nuclear Information System (INIS)

    Watson, P.; Yang, J.X.; Dam, R.F.; Nickerson, J.H.

    2003-01-01

    Nuclear plant equipment aging assessment studies provided by AECL include life assessments, condition assessments or systematic assessments of maintenance. AECL has developed several tools to apply the results of aging assessment studies to improve the effectiveness of actual plant maintenance programs. The Systematic Assessment of Maintenance and the SYSTMS tool generate maintenance tasks for a system. The System Maintenance Datastore tool assesses the maintenance resources on a system basis, and can thus quantify the savings realized by optimizing the maintenance program. Long term trends in condition-based maintenance due to component aging can be predicted, and resource savings due to optimum timing of component replacement or general plant refurbishment can be quantified. The System based Adaptive Maintenance Process ensures the maintenance program is continually updated to reflect the latest plant equipment condition and maintenance strategy information. (author)

  10. SafeNet: a methodology for integrating general-purpose unsafe devices in safe-robot rehabilitation systems.

    Science.gov (United States)

    Vicentini, Federico; Pedrocchi, Nicola; Malosio, Matteo; Molinari Tosatti, Lorenzo

    2014-09-01

    Robot-assisted neurorehabilitation often involves networked systems of sensors ("sensory rooms") and powerful devices in physical interaction with weak users. Safety is unquestionably a primary concern. Some lightweight robot platforms and devices designed on purpose include safety properties using redundant sensors or intrinsic safety design (e.g. compliance and backdrivability, limited exchange of energy). Nonetheless, the entire "sensory room" shall be required to be fail-safe and safely monitored as a system at large. Yet, sensor capabilities and control algorithms used in functional therapies require, in general, frequent updates or re-configurations, making a safety-grade release of such devices hardly sustainable in cost-effectiveness and development time. As such, promising integrated platforms for human-in-the-loop therapies could not find clinical application and manufacturing support because of lacking in the maintenance of global fail-safe properties. Under the general context of cross-machinery safety standards, the paper presents a methodology called SafeNet for helping in extending the safety rate of Human Robot Interaction (HRI) systems using unsafe components, including sensors and controllers. SafeNet considers, in fact, the robotic system as a device at large and applies the principles of functional safety (as in ISO 13489-1) through a set of architectural procedures and implementation rules. The enabled capability of monitoring a network of unsafe devices through redundant computational nodes, allows the usage of any custom sensors and algorithms, usually planned and assembled at therapy planning-time rather than at platform design-time. A case study is presented with an actual implementation of the proposed methodology. A specific architectural solution is applied to an example of robot-assisted upper-limb rehabilitation with online motion tracking. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  11. Computational framework for risk-based planning of inspections, maintenance, and condition monitoring using discrete Bayesian networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær; Sørensen, John Dalsgaard

    2018-01-01

    This paper presents a computational framework for risk-based planning of inspections and repairs for deteriorating components. Two distinct types of decision rules are used to model decisions: simple decision rules that depend on constants or observed variables (e.g. inspection outcome...... expecte d life-cycle costs. For advanced decision rules, simulations are performed to estimate the expected costs, and dBNs are used within the simulations for decision-making. Information from inspections and condition monitoring are included if available. An example in the paper demonstrates...... the framework and the implemented strategies and decision rules, including various types of condition-based maintenance. The strategies using advanced decision rules lead to reduced costs compared to the simple decision rules when condition monitoring is applied, and the value of condition monitoring...

  12. Design for maintenance during operation

    International Nuclear Information System (INIS)

    Barton, P.H.; Lyerly, H.D.

    1976-01-01

    Design of a nuclear power plant for safe, reliable and efficient operation involves much more than theory, regulations, regulatory guides, procedures, inspectors, and even quality assurance. It also involves a full knowledge and understanding of the activities which must be carried out to operate and maintain the plant. It must be remembered that a nuclear power plant is different from fossil designs and the designer must constantly keep in mind that access by people to every component is required for maintenance

  13. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  14. Safe operating envelope

    Energy Technology Data Exchange (ETDEWEB)

    Oliva, N [Ontario Hydro, Toronto, ON (Canada)

    1997-12-01

    Safe Operating Envelope is described representing: The outer bound of plant conditions within which day-to-day plant operation must be maintained in order to comply with regulatory requirements, associated safety design criteria and corporate nuclear safety goals. Figs.

  15. Safe operating envelope

    International Nuclear Information System (INIS)

    Oliva, N.

    1997-01-01

    Safe Operating Envelope is described representing: The outer bound of plant conditions within which day-to-day plant operation must be maintained in order to comply with regulatory requirements, associated safety design criteria and corporate nuclear safety goals. Figs

  16. Comparative evaluation of remote maintenance schemes for fusion DEMO reactor

    Energy Technology Data Exchange (ETDEWEB)

    Utoh, Hiroyasu, E-mail: uto.hiroyasu@jaea.go.jp; Tobita, Kenji; Someya, Youji; Asakura, Nobuyuki; Sakamoto, Yoshiteru; Hoshino, Kazuo; Nakamura, Makoto

    2015-10-15

    Highlights: • Various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. • The banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme. • The key engineering issues are in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability. - Abstract: Maintenance schemes are one of the critical issues in DEMO design, significantly affecting the configuration of in-vessel components, the size of toroidal field (TF) coil, the arrangement of poloidal field (PF) coils, reactor building, hot cell and so forth. Therefore, the maintenance schemes should satisfy many design requirements and criteria to assure reliable and safe plant operation and to attain reasonable plant availability. The plant availability depends on reliability of remote maintenance scheme, inspection of pipe connection and plasma operation. In this paper, various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. From the view points of the reliability of inspection on hot cell, TF coil size, stored energy of PF coil and portability of segment, the banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme, and it has key engineering issues such as in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability.

  17. Comparative evaluation of remote maintenance schemes for fusion DEMO reactor

    International Nuclear Information System (INIS)

    Utoh, Hiroyasu; Tobita, Kenji; Someya, Youji; Asakura, Nobuyuki; Sakamoto, Yoshiteru; Hoshino, Kazuo; Nakamura, Makoto

    2015-01-01

    Highlights: • Various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. • The banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme. • The key engineering issues are in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability. - Abstract: Maintenance schemes are one of the critical issues in DEMO design, significantly affecting the configuration of in-vessel components, the size of toroidal field (TF) coil, the arrangement of poloidal field (PF) coils, reactor building, hot cell and so forth. Therefore, the maintenance schemes should satisfy many design requirements and criteria to assure reliable and safe plant operation and to attain reasonable plant availability. The plant availability depends on reliability of remote maintenance scheme, inspection of pipe connection and plasma operation. In this paper, various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. From the view points of the reliability of inspection on hot cell, TF coil size, stored energy of PF coil and portability of segment, the banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme, and it has key engineering issues such as in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability.

  18. Corrective maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Kakiuchi, Tetsuo

    1996-01-01

    With increase of share of nuclear power generation in electric power supply in Japan, requirement for further safe operation and improvement of economics for the nuclear power plants is promoting. The pressed water type (PWR) nuclear power plant in operation in Japan reaches to 22 sets, application rate of the instruments is 74% as mean value for 7 years since 1989 and in high level, which is due to a result of preventive maintenance in ordinary and periodical inspections. The present state of maintenance at the nuclear power plant is mainly preventive maintenance, which is mainly conducted in a shape of time planning maintenance but partially in a shape of state monitoring maintenance for partial rotating appliances. Concretely speaking, the periodical inspection was planned on a base of daily inspection and a long term program on maintenance, and executed on a base of feedback function to think of the long term program again by evaluating the periodical inspection results. Here were introduced on the monitoring diagnosis and periodical inspection regionalization equipment, fatigue monitoring system, automatic supersonic wave damage inspection equipment for reactor, steam evaporator heat conductive tube inspection equipment, automatic testing equipment for measuring controller, air working valve property testing equipment, as maintaining support system in the PW generation plant. (G.K.)

  19. Reducing maintenance costs

    International Nuclear Information System (INIS)

    Zaiss, W.; Reuschle, K.; Baier, B.

    2002-01-01

    The increasingly more expensive maintenance measures, cuts in the cost budget, and the loss of know-how on the part of vendors all require a change of policy with respect to maintenance concepts of the part of operators. This also applies to the existing valve concepts, the drives included. Under these aspects, the current drive, which is self-actuated and actuated by outside media, for a parallel-plate valve of a nomial width of 700 was reconsidered. The effort served to reduce maintenance costs and, at the same time, simplify the drive concept as well as cut back on the number of in-service inspections. Moreover, the number of active components were to be minimized and installation conditions in the plant were to be improved. When the boundary conditions to be observed with respect to process technology had been laid down, the competent technical department developed a concept of modification of the drive. A major constituent part was the demonstration of the functioning capability of the new drive under accident conditions. It was achieved mainly by an analytical approach. In the resultant drive concept, the same control valves are employed to actuate a driving cylinder by means of self-actuation or by an outside medium as a function of pressure. (orig.) [de

  20. Preventive maintenance-A countermeasure to plant aging

    International Nuclear Information System (INIS)

    Hlubek, W.

    1985-01-01

    The aging of power plants is caused by manifold and different influences. For instance, mechanical and thermal stress, radiation exposure, denting or wastage can considerably affect the aging of plant components and thus cause premature failures of components. In this presentation, the term 'Plant Aging' in nuclear power plants is to be understood more comprehensively than wear on components and material fatigue. In addition, nuclear power plants are to be adjusted to the advancing state of the science and technology (state-of-the-art) in order to guarantee safe operation at all times. The preventive maintenance - as a countermeasure to plant aging - comprises the systematic checks and servicing of the plant systems in operation and follows aging by inspection and tests. Experience with Rheinisch-Westfaelisches Elektrizitaetswerk AG (RWE) preventive maintenance program at the Biblis NNP (1300 MW, PWR) is discussed. The concept of an 'Integrated Maintenance System' as a means to avoid 'Plant Aging' is presented

  1. Darlington Station outage - a maintenance perspective

    International Nuclear Information System (INIS)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K.

    1997-01-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  2. Development of plant maintenance systems

    International Nuclear Information System (INIS)

    Tomita, Jinji; Ike, Masae; Nakayama, Kenji; Kato, Hisatomo

    1989-01-01

    Toshiba is making active efforts for the continuing improvement of reliability and maintainability of operating nuclear power plants. As a part of these efforts, the company has developed new maintenance administration systems, diagnostic monitoring facilities for plant equipments, computer-aided expert systems, and remote-controlled machines for maintenance work. The maintenance administration systems provide efficient work plans and data acquisition capabilities for the management of personnel and equipments involved in nuclear power plant maintenance. The plant diagnostic facilities monitor and diagnose plant conditions for preventive maintenance, as well as enabling rapid countermeasures to be carried out should they be required. Expert systems utilizing artificial intelligence (AI) technology are also employed. The newly developed remote-controlled machines are useful tools for the maintenance inspection of equipment which can not be easily accessed. (author)

  3. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  4. 9th International conference on CANDU maintenance

    International Nuclear Information System (INIS)

    2011-01-01

    The 9th International Conference on CANDU Maintenance was held in Toronto, Ontario, Canada on December 4-6, 2011. The conference focused on Nuclear plant reliability and maintenance. Equipment reliability is a critical factor in achieving safe and reliable Nuclear Power Plant operations for many reasons. For one it reduces the challenges upon the operating staff and allows station personnel to 'go on the offence' instead of having to play defense in a reactive mode. Plant reliability ensures that there is time to study the issues in detail and develop solutions for long-term success. Let us not forget that the owner carries the burden of demonstrating the return on investment, and plant reliability goes a long way in helping to make the case for plant life extension. A good reputation for plant reliability provides the public capital necessary to build confidence and facilitate the licensing process. The proceedings papers and presentations given at the 9th International Conference on Candu Maintenance covered topics that include: Managing Worker; Radiation Dose; Full Life Cycle Management; Managing Maintenance Refurbishment; Designing for Maintainability; Inspection Techniques; and, Mitigating Degradation.

  5. A randomized controlled trial of interim methadone maintenance.

    Science.gov (United States)

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (Pmethadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  6. Periodic imperfect preventive maintenance with two categories of competing failure modes

    Energy Technology Data Exchange (ETDEWEB)

    Zequeira, R.I. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: romulo.zequeira@utt.fr; Berenguer, C. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: christophe.berenguer@utt.fr

    2006-04-15

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists.

  7. Periodic imperfect preventive maintenance with two categories of competing failure modes

    International Nuclear Information System (INIS)

    Zequeira, R.I.; Berenguer, C.

    2006-01-01

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists

  8. Value maximizing maintenance policies under general repair

    International Nuclear Information System (INIS)

    Marais, Karen B.

    2013-01-01

    One class of maintenance optimization problems considers the notion of general repair maintenance policies where systems are repaired or replaced on failure. In each case the optimality is based on minimizing the total maintenance cost of the system. These cost-centric optimizations ignore the value dimension of maintenance and can lead to maintenance strategies that do not maximize system value. This paper applies these ideas to the general repair optimization problem using a semi-Markov decision process, discounted cash flow techniques, and dynamic programming to identify the value-optimal actions for any given time and system condition. The impact of several parameters on maintenance strategy, such as operating cost and revenue, system failure characteristics, repair and replacement costs, and the planning time horizon, is explored. This approach provides a quantitative basis on which to base maintenance strategy decisions that contribute to system value. These decisions are different from those suggested by traditional cost-based approaches. The results show (1) how the optimal action for a given time and condition changes as replacement and repair costs change, and identifies the point at which these costs become too high for profitable system operation; (2) that for shorter planning horizons it is better to repair, since there is no time to reap the benefits of increased operating profit and reliability; (3) how the value-optimal maintenance policy is affected by the system's failure characteristics, and hence whether it is worthwhile to invest in higher reliability; and (4) the impact of the repair level on the optimal maintenance policy. -- Highlights: •Provides a quantitative basis for maintenance strategy decisions that contribute to system value. •Shows how the optimal action for a given condition changes as replacement and repair costs change. •Shows how the optimal policy is affected by the system's failure characteristics. •Shows when it is

  9. The right to adequate and safe working conditions in Ukraine

    Directory of Open Access Journals (Sweden)

    Едуард Валентинович Гаврилов

    2016-06-01

    Full Text Available The special attention is given to the rights of the citizens for independent and safe working conditions. The rights secured by law and guaranteed of each among workers and employers have been considered. The court case on infliction of harm to health in the performance of job duties has been analyzed. Taking this case as an example one can see different possible ways of its solution that cause controversy and contradictions. The Court of First Instance takes the side of the employer, Court of Appeal – on the side of the victim and consideration of the case on cassation appeal - shows only that the state taking the role of the judge is on the employer side not on the side of the worker as a victim. So, one can see that course of the state policy secured by legislators in the numerous normative acts and being reflection of the constitutional principle of the recognition by the state of  the human being, his or her life and health, honour and dignity, inviolability and security as the highest social value that is foreseen by Article 3 and by the provision of Part 4 Article 43 of the Basic Law does not correspond to the realities of life.

  10. Comparison of the effects of two anesthesia maintenance methods by remifentanil or halothane on endoscopic sinus surgery condition

    Directory of Open Access Journals (Sweden)

    Seyed mojtaba Karimi

    2008-07-01

    Full Text Available Introduction: Endoscopic surgery is a new standard method of treatment for chronic sinusitis. During this operation even small amount of bleeding may reduce the visual field of surgeon significantly and make the procedure troublesome. In this study we have compared the operative condition between patients who receive either remifentanil or halothane for general anesthesia. Materials and Methods: Endoscopic sinus surgery was performed in 60 patents. Pre- medication was done by fentanil and midazolam and induction was done by propofol and atracurium. Halothane or remifentanil was used in two groups of patients respectively for anesthesia maintenance. Monitoring was performed during anesthesia. Bleeding volume was measured and operation field condition was assessed by the surgeon. Results: Personal characteristics such as age and sex were the same in both groups. Intra- operative systolic blood pressures was significantly lower in remifentanil group but diastolic and mean blood pressure and heart rate didn’t change after induction and during maintenance in both groups. Recovery time in remifentanil group was also significantly shorter than halothane group. Finally bleeding volume was lower and operation field condition was better significantly in remifentanil group. Conclusion: Remifentanil is a good choice to maintain an ideal anesthesia for endoscopic sinus surgery.    

  11. Hardware-oriented reliability centered maintenance for the diesel generators of Wolsong unit 1

    International Nuclear Information System (INIS)

    Bae, Sang Min; Park, Jin Hee; Kim, Tae Woon; Lee, Yoon Kee; Song, Jin Bae

    1997-01-01

    The DGs (Diesel Generators) in NPP (Nuclear Power Plant) has been used for the emergency electric power source to shut down the nuclear reactor safely in case of station blackout. The RCM (Reliability Centered Maintenance) has been applied to DGs for increasing the safety of NPP. The structured defects of DG were not remedied by the improvement of maintenance method. As the first stage of RCM, to find the structured defects, its failure modes were searched and analyzed through the ten year maintenance information. The structured defects such as the air compressor, the lubricating oil pressure, and the insufficient load were the root causes of main failures. The air reservoir reinstallation, the lubricating oil tube modification, the load bank installation, and the qualitative instrumentation were the solutions for the hardware oriented RCM of DGs. There remains the software oriented RCM such as the rejection of useless maintenance, the preventive maintenance, the database of maintenance information, and the predictive maintenance

  12. Are air-conditioning maintenance personnel at increased risk of Legionellosis?

    Science.gov (United States)

    Goldman, W D; Marr, J S

    1980-07-01

    We surveyed by use of medical questionnaires and blood tests 21 maintenance workers involved with cleaning and servicing cooling towers and evaporative condensers at a large company to determine the frequency of pneumonia and antibody levels against Legionella pneumophila serogroup 1. The 21 high-risk workers were compared with 27 low-risk workers, persons who were not directly involved in service or maintenance for the company. The overall prevalence of titers greater than or equal to 128 for the 21 high-risk workers was 19.0% compared with 22.2% for the low-risk group. There were no significant differences in the history of pneumonia between these groups. Possible explanations for these findings are discussed.

  13. Road Maintenance and Rehabilitation Program Using Functional and Structural Assessment

    Science.gov (United States)

    Setianingsih, A. I.; Sangaji, S.; Setyawan, A.

    2017-02-01

    Road sector development policy in Bangka Belitung emphasis on equitable development, which is opening up new areas for industrial development zones of potential marine and coastal tourism, so that having an impact on the budget priority to build a new road. This led to a minimal budget provided for the maintenance of the existing road. This study aimed to evaluate the condition of the pavement both functionally and structurally, the growth of traffic density and the availability of existing road maintenance costs. Then, to analyze the influence of existing road conditions, traffic density and road maintenance costs to the type of road maintenance management. The results are compared with the results of the existing maintenance conducted by the Public Works Department of Bangka Belitung province. Evaluation of pavement conditions consists of visual assessment of pavement condition using IRI, pavement condition assessment functionally with deflection method using test data tool Benkelman Beam (BB) and the actual traffic load. IRI value, deflections and traffic growth gained from years 2011-2015 subsequently created regression models to obtain the relationship and the correlation coefficient. The analysis showed that using the same relative magnitude of the budget from 2011 to 2015, giving priority to the maintenance of the road with good conditions capable of providing the road with a steady state of 100%. Recommendations can be given that maintain the road with good conditions reflecting that preservation provide maximum results with the more efficient maintenance cost.

  14. Maintenance Planning for Historic Buildings

    Directory of Open Access Journals (Sweden)

    Diana Plian

    2008-01-01

    Full Text Available The key to good maintenance of historic buildings is a long-range maintenance plan. Long-range planning recognizes a responsibility to the future to prolong the useful life of a building by preserving it in its present condition and preventing or slowing deterioration and damage from natural or other causes.

  15. Toxicological study of a new maintenance fluid, Veen 3G, in rats.

    Science.gov (United States)

    Kamei, J; Onodera, K; Kawaguchi, M; Shibata, M; Kagawa, M; Wachi, M; Kojima, J

    2002-10-01

    A study of the different volume and infusion rates of a new maintenance fluid, Veen 3G, on the general conditions of rats was investigated during the 14 days after infusion. In Experiment I, 100 ml/kg and 200 ml/kg of Veen 3G were infused at a rate of 300 ml/kg/h in male and female rats. Results were compared with those for Gurunon Ringer solution (GRS) in male and female rats. We observed only transient polyuria in animals administered by each dose of Veen 3G and GRS for 0-15 min after infusion. Necropsy was not observed in any of the animals tested 14 days after infusion. In Experiment II, 200 ml/kg of Veen 3G was infused at rates of 200, 400, 800 and 1600 ml/kg/h in male rats. At 800 and 1600 ml/kg/h, irregular respiration and decrease in movement were observed concomitantly with polyuria. Three out of 4 rats died immediately after the infusion of Veen 3G at a rate of 1600 ml/kg/h, and one rat was still alive 14 days after the infusion. In this experiment, 200 ml/kg Veen 3G was safe when we infused at a rate of less than 400 ml/kg/h in male rats. Since this rate is about 27-80 times higher than that used clinically in maintenance treatment, Veen 3G is suggested to be safe, with the exception of polyuria, in clinical situations at the standard infusion rate (5-15 ml/kg/h).

  16. On Different Maintenance Strategies for Casted Components of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    . This maintenance tool uses Crude Monte Carlo Simulations to estimate the expected maintenance costs. Corrective and preventive maintenance strategies with a constant inspection interval or a condition monitoring system are considered. Furthermore, transportation from shore to the wind turbines by boat...... and transportation strategy. The case study shows that the maintenance expenses of casted components correspond to roughly 5% of the overall expected maintenance costs when using a corrective maintenance strategy. This amount can be decreased to roughly 2% when using a condition monitoring system and following...

  17. Advisory Material for the IAEA Regulations for the Safe Transport of Radioactive Material (2012 Ed.). Specific Safety Guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-06-15

    This Safety Guide provides recommendations and guidance on achieving and demonstrating compliance with IAEA Safety Standards Series No. SSR-6, Regulations for the Safe Transport of Radioactive Material (2012 Edition), which establishes the requirements to be applied to the national and international transport of radioactive material. Transport is deemed to comprise all operations and conditions associated with and involved in the movement of radioactive material, including the design, fabrication and maintenance of packaging, and the preparation, consigning, handling, carriage, storage in transit and receipt at the final destination of packages. This publication supersedes IAEA Safety Standards Series No. TS-G-1.1 Rev. 1, which was issued in 2008.

  18. Present status of the Nuclear Maintenance Training Center

    International Nuclear Information System (INIS)

    Kotani, Fumio

    1995-01-01

    The education and training to keep and improve the knowledge and skills of the maintenance personnel and to hand down the skills undoubtedly play important roles in safe operation and increased reliability to a nuclear power station. The Nuclear Maintenance Training Center (hereafter called the Center) provides a variety of education and training curriculums based on the levels and abilities of the trainees. The Center aims to enhance the personnel's maintenance technique by offering the curriculums on maintenance basic education for operators and supporting education and training for the personnel of contractors. The Center has two main features: first, it has the actual components or the equipment similar to the actual components which will enable the practical training; second, we regard the past troubles as valuable experiences and, therefore, focuses on the education to prevent recurrence of troubles by teaching the trainees the meaning and necessity of the training they take. For eleven years since the establishment of the Center, it has been utilized by the total number of about 60,000 people. As for the tasks in the future, the Center is expected to vitalize itself to give attractive education and training and become more actively involved in development of the maintenance personnel with the adequate knowledge and skills. (author)

  19. Rock mechanical conditions at the Aespoe HRL. A study of the correlation between geology, tunnel maintenance and tunnel shape

    International Nuclear Information System (INIS)

    Andersson, Christer; Soederhaell, Joergen

    2001-12-01

    Maintenance records including scaling, shotcreting and bolting have been kept since the excavation start of Aespoe HRL 1990 together with records of groundwater flow and all other activities taking place in the tunnels. When the facility was constructed one objective was to limit the rock support as much as possible. The reason for this was that it should be possible to go back and easily study the exposed rock surface. Support during the operational phase has only been carried out where and when necessary. This type of maintenance and its location is documented in the digital database each time. The maintenance records have been compiled and areas requiring more maintenance than average noted. An interview has also been held with one of the miners conducting scaling and bolting in the tunnel. His experiences together with the study of the database maintenance records led to the selection of certain areas in the tunnel to be studied by numerical modelling. The probable reason for the need of additional maintenance in all areas, not only these numerically modelled, has been investigated. Almost all maintenance in the main tunnel both during construction and the operational phase has been located in the widened curves of the access tunnel. The maintenance is also located in areas containing veins or intrusions of Smaaland granite or fine-grained granite. These areas are often located in fracture zones of different sizes or show an increasing fracture frequency. The areas numerically modelled indicate stress concentrations or unloaded stress conditions. The stress concentrations are created by the geometry of the niches and side-tunnels in relation to the in situ stress field. The angle between the tunnel and the major principal stress has an impact on the need for maintenance. The areas with the largest angles towards the principal stress direction need more maintenance than the areas almost parallel to the major principal stress direction. The maintenance work in

  20. Safe driving for teens

    Science.gov (United States)

    Driving and teenagers; Teens and safe driving; Automobile safety - teenage drivers ... months before taking friends as passengers. Teenage-related driving deaths occur more often in certain conditions. OTHER SAFETY TIPS FOR TEENS Reckless driving is still a ...

  1. Regulations for the safe transport of radioactive material

    International Nuclear Information System (INIS)

    1995-01-01

    Regulations and rules for the safe transport of radioactive materials by all kinds of conveyance are offered. Different types of packages and the conditions associated with the methods of safe packaging are given

  2. Good practices for cost effective maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1997-02-01

    This publication is organized around five areas that were identified by the utilities and government organizations who contributed to this report as most important to them. They are: Increasing production through maintenance activities related to improved plant material condition, reduced duration of planned outages, use of on-line maintenance and reduced frequency of forced outages; reducing workload through avoiding unnecessary regulatory burden and using reliability centered maintenance and condition monitoring; improving maintenance processes through better planning and scheduling, use of information management systems, graduated work controls, and appropriate post-maintenance testing; improving productivity through better teamwork, greater sharing of resources, and better radiation management associated with maintenance; measuring performance of maintenance activities through such tools as performance measures and benchmarking. Figs, tabs

  3. Status of online maintenance in the world

    International Nuclear Information System (INIS)

    Mizumachi, Wataru; Kobayashi, Masahide

    2009-01-01

    In many countries, online maintenance has been already introduced. Especially in US, online maintenance has been introduced to many nuclear plants which has (N+1) redundant safety systems as Japanese plants. There experience will contribute us to discuss how to introduce online maintenance in Japan. In IAEA's nuclear safety criteria and guidance, it is recognized that the outage of one safety system for maintenance is usual operation. This is normal sense in the world. In US, the risk when online maintenance is done is controlled mainly by PRA. We have to discuss how to introduce online maintenance in JAPAN under these conditions in the world. (author)

  4. Engineering systems reliability, safety, and maintenance an integrated approach

    CERN Document Server

    Dhillon, B S

    2017-01-01

    Today, engineering systems are an important element of the world economy and each year billions of dollars are spent to develop, manufacture, operate, and maintain various types of engineering systems around the globe. Many of these systems are highly sophisticated and contain millions of parts. For example, a Boeing jumbo 747 is made up of approximately 4.5 million parts including fasteners. Needless to say, reliability, safety, and maintenance of systems such as this have become more important than ever before.  Global competition and other factors are forcing manufacturers to produce highly reliable, safe, and maintainable engineering products. Therefore, there is a definite need for the reliability, safety, and maintenance professionals to work closely during design and other phases. Engineering Systems Reliability, Safety, and Maintenance: An Integrated Approach eliminates the need to consult many different and diverse sources in the hunt for the information required to design better engineering syste...

  5. Polyspectral signal analysis techniques for condition based maintenance of helicopter drive-train system

    Science.gov (United States)

    Hassan Mohammed, Mohammed Ahmed

    For an efficient maintenance of a diverse fleet of air- and rotorcraft, effective condition based maintenance (CBM) must be established based on rotating components monitored vibration signals. In this dissertation, we present theory and applications of polyspectral signal processing techniques for condition monitoring of critical components in the AH-64D helicopter tail rotor drive train system. Currently available vibration-monitoring tools are mostly built around auto- and cross-power spectral analysis which have limited performance in detecting frequency correlations higher than second order. Studying higher order correlations and their Fourier transforms, higher order spectra, provides more information about the vibration signals which helps in building more accurate diagnostic models of the mechanical system. Based on higher order spectral analysis, different signal processing techniques are developed to assess health conditions of different critical rotating-components in the AH-64D helicopter drive-train. Based on cross-bispectrum, quadratic nonlinear transfer function is presented to model second order nonlinearity in a drive-shaft running between the two hanger bearings. Then, quadratic-nonlinearity coupling coefficient between frequency harmonics of the rotating shaft is used as condition metric to study different seeded shaft faults compared to baseline case, namely: shaft misalignment, shaft imbalance, and combination of shaft misalignment and imbalance. The proposed quadratic-nonlinearity metric shows better capabilities in distinguishing the four studied shaft settings than the conventional linear coupling based on cross-power spectrum. We also develop a new concept of Quadratic-Nonlinearity Power-Index spectrum, QNLPI(f), that can be used in signal detection and classification, based on bicoherence spectrum. The proposed QNLPI(f) is derived as a projection of the three-dimensional bicoherence spectrum into two-dimensional spectrum that

  6. Incorrect modeling of the failure process of minimally repaired systems under random conditions: The effect on the maintenance costs

    International Nuclear Information System (INIS)

    Pulcini, Gianpaolo

    2015-01-01

    This note investigates the effect of the incorrect modeling of the failure process of minimally repaired systems that operates under random environmental conditions on the costs of a periodic replacement maintenance. The motivation of this paper is given by a recently published paper, where a wrong formulation of the expected cost for unit time under a periodic replacement policy is obtained. This wrong formulation is due to the incorrect assumption that the intensity function of minimally repaired systems that operate under random conditions has the same functional form as the failure rate of the first failure time. This produced an incorrect optimization of the replacement maintenance. Thus, in this note the conceptual differences between the intensity function and the failure rate of the first failure time are first highlighted. Then, the correct expressions of the expected cost and of the optimal replacement period are provided. Finally, a real application is used to measure how severe can be the economical consequences caused by the incorrect modeling of the failure process.

  7. A dynamic predictive maintenance policy for complex multi-component systems

    International Nuclear Information System (INIS)

    Van Horenbeek, Adriaan; Pintelon, Liliane

    2013-01-01

    The use of prognostic methods in maintenance in order to predict remaining useful life is receiving more attention over the past years. The use of these techniques in maintenance decision making and optimization in multi-component systems is however a still underexplored area. The objective of this paper is to optimally plan maintenance for a multi-component system based on prognostic/predictive information while considering different component dependencies (i.e. economic, structural and stochastic dependence). Consequently, this paper presents a dynamic predictive maintenance policy for multi-component systems that minimizes the long-term mean maintenance cost per unit time. The proposed maintenance policy is a dynamic method as the maintenance schedule is updated when new information on the degradation and remaining useful life of components becomes available. The performance, regarding the objective of minimal long-term mean cost per unit time, of the developed dynamic predictive maintenance policy is compared to five other conventional maintenance policies, these are: block-based maintenance, age-based maintenance, age-based maintenance with grouping, inspection condition-based maintenance and continuous condition-based maintenance. The ability of the predictive maintenance policy to react to changing component deterioration and dependencies within a multi-component system is quantified and the results show significant cost savings

  8. Maximizing Benefits from Maintenance Pemetrexed with Stereotactic Ablative Radiotherapy in Oligoprogressive Non-Squamous Non-Small Cell Lung Cancer

    Directory of Open Access Journals (Sweden)

    Shao-Lun Lu

    2016-08-01

    Full Text Available Maintenance pemetrexed offers survival benefit with well-tolerated toxicities for advanced non-squamous non-small cell lung cancer (NSCLC. We present 3 consecutively enrolled patients with advanced non-squamous NSCLC, receiving stereotactic ablative radiotherapy (SABR for oligoprogressive disease during maintenance pemetrexed. All of them had sustained local control of thoracic oligoprogression after the SABR, while maintenance pemetrexed were kept for additionally long progression-free interval. SABR targeting oligoprogression with continued pemetrexed is an effective and safe approach to extend exposure of maintenance pemetrexed, thus maximizing the benefit from it.

  9. Pavement maintenance scheduling using genetic algorithms

    OpenAIRE

    Yang, Chao; Remenyte-Prescott, Rasa; Andrews, John D.

    2015-01-01

    This paper presents a new pavement management system (PMS) to achieve the optimal pavement maintenance and rehabilitation (M&R) strategy for a highway network using genetic algorithms (GAs). Optimal M&R strategy is a set of pavement activities that both minimise the maintenance cost of a highway network and maximise the pavement condition of the road sections on the network during a certain planning period. NSGA-II, a multi-objective GA, is employed to perform pavement maintenance optimisatio...

  10. Continuous improvement of operation and maintenance conditions of french PWR nuclear islands

    International Nuclear Information System (INIS)

    Bitsch, D.

    1985-05-01

    Improvement of the nuclear island design, to facilitate maintenance and working conditions during plant shutdown, has been a subject of particular attention within the French PWR program. Standardization and industrial concentration created an unusually favourable context for approaching this objective. Progress efforts supported by the feedback of actual operating experience were pursued in the areas of plant layout-equipment installation, and on the design and technology of the component themselves. The progress efforts on the design and technology of the components were pursued along several paths including: - the resistance increase of specific parts submitted to various forms of in-service damage, - the reduction of the extent and duration of work during plant outages and - the reduction of the Occupational Radiation Exposure (ORE), one of the most important axes of development, through the appropriate selection of less releasing materials, the implementation of more efficient decontamination systems and by the use of robots

  11. In vitro maintenance, under slow-growth conditions, of oil palm germplasm obtained by embryo rescue

    Directory of Open Access Journals (Sweden)

    Julcéia Camillo

    2015-05-01

    Full Text Available The objective of this work was to evaluate the in vitro maintenance of oil palm (Elaeis guineensis and E. oleifera accessions under slow-growth conditions. Plants produced by embryo rescue were subject to 1/2MS culture medium supplemented with the carbohydrates sucrose, mannitol, and sorbitol at 1, 2, and 3% under 20 and 25±2ºC. After 12 months, the temperature of 20°C reduced plant growth. Sucrose is the most appropriate carbohydrate for maintaining the quality of the plants, whereas mannitol and sorbitol result in a reduced plant survival.

  12. Using heuristic search for optimizing maintenance plans

    International Nuclear Information System (INIS)

    Mutanen, Teemu

    2012-01-01

    This work addresses the maintenance action selection process. Maintenance personnel need to evaluate maintenance actions and costs to keep the machines in working condition. Group of actions are evaluated together as maintenance plans. The maintenance plans as output provide information to the user about which actions to take if any and what future actions should be prepared for. The heuristic search method is implemented as part of general use toolbox for analysis of measurements from movable work machines. Impacts from machine's usage restrictions and maintenance activities are analysed. The results show that once put on a temporal perspective, the prioritized order of the actions is different and provide additional information to the user.

  13. The anticipated costs analysis and benefit items survey against performing the maintenance rule

    International Nuclear Information System (INIS)

    Hwang, M. J.; Kim, K. Y.; Yang, Z. A.

    2002-01-01

    In this paper, we surveyed the cost and benefit items and evaluated the costs against performing the Maintenance Rule. In the past, only one electric power company had provided the electricity without free competition in Korea. In these days, however, the electric power company was divided into two parts by the sources: atomic and hydraulic generation and thermal-power generation. Therefore, the generation sources that done have competitiveness at the price will be weeded out in the electric power market. Although the preferential goal is on the safe operation at the Nuclear power Plants (NPPs), if too much money is required to maintain or improve the safety of the NPP, the licensee could hesitate to adopt the program related to the safety even though it is a good one. Since the Risk-Informed Applications (RIA) have been using for a plant operation in recent, the condition of a plant might be changed. Therefore, considering the affects of the RIA, a method to keep the capability through the monitoring the maintenance effectiveness has been proposed. However, to perform this, a number of works, continuous collecting data and monitoring the maintenance effectiveness and understanding the reason of degrading capability, should be preceded. Therefore, a lot of man-hour is needed to develop and to manage the application method, and the licensee should pay the costs. Therefore, in the domestic circumstance, it is necessary to evaluate the cost to monitor the maintenance effectiveness. Hence, we are going to examine the cost to perform the MR and its anticipated benefit lists

  14. Machinery prognostics and prognosis oriented maintenance management

    CERN Document Server

    Yan, Jihong

    2014-01-01

    This book gives a complete presentatin of the basic essentials of machinery prognostics and prognosis oriented maintenance management, and takes a look at the cutting-edge discipline of intelligent failure prognosis technologies for condition-based maintenance.  Latest research results and application methods are introduced for signal processing, reliability moelling, deterioration evaluation, residual life prediction and maintenance-optimization as well as applications of these methods.

  15. Estimating cost per lane mile for routine highway operations and maintenance

    Science.gov (United States)

    2011-01-01

    The disparity between maintenance budgets and maintenance requirements causes agencies to make difficult choices : about maintenance priorities. There is a growing need to effectively link maintenance costs and condition to provide clear : evidence o...

  16. BALTICA III. Plant condition and life management

    International Nuclear Information System (INIS)

    Hietanen, S.; Auerkari, P.

    1995-01-01

    The BALTICA III, International Conference on Plant Condition and Life Management was held on June 6 - 8, 1995 on board Silja Serenade on its cruise between Helsinki - Stockholm and at the Forest Lake Hotel Korpilampi in Espoo. BALTICA III provides forum for the transfer of technology from applied research to practise. This is the second volume of the publications, which contain the presentations given at the BALTICA III, Plant Condition and Life Management. A total of 45 articles report recent experience in plant condition and life management. The conference focuses on recent applications that have been demonstrated for the benefit of safe and economical operation of power plants. Practical approach is emphasised, including the presentations that aim to provide insight into new techniques, improvements in assessment methodologies as well as maintenance strategies. Compared to earlier occasions in the BALTICA series, a new aspect is in the applications of knowledge-based systems in the service of power plant life management. (orig.)

  17. Human Error Probability Assessment During Maintenance Activities of Marine Systems

    OpenAIRE

    Rabiul Islam; Faisal Khan; Rouzbeh Abbassi; Vikram Garaniya

    2018-01-01

    Background: Maintenance operations on-board ships are highly demanding. Maintenance operations are intensive activities requiring high man–machine interactions in challenging and evolving conditions. The evolving conditions are weather conditions, workplace temperature, ship motion, noise and vibration, and workload and stress. For example, extreme weather condition affects seafarers' performance, increasing the chances of error, and, consequently, can cause injuries or fatalities to personne...

  18. Functions of the cask maintenance facility: A white paper

    International Nuclear Information System (INIS)

    1987-01-01

    The shipping cask systems are the mobile components of the transportation system, designed to safely transport spent nuclear fuel between different facilities under both normal and accident conditions. The cask system will consist of the heavily shielded cask, the cask transport vehicle (truck trailer or railcar), and any associated ancillary equipment (covers, impact limiters, lifting devices, etc.). The cask and certain parts of the cask system must be operated within the limits imposed by a certificate of compliance (COC) granted by the Nuclear Regulatory Commission (NRC). Each cask system must transport spent fuel safely during the life of the system. To maintain the operational effectiveness and safety of the cask systems, a cask maintenance facility (CMF) will be included as an integral part of the transportation system. The planning activity of the transportation system and the design effort of the CMF require that the functions to be performed by the CMF be explicitly defined. The purpose of this paper is to (1) define the potential transportation system functions to be performed at the CMF; (2) examine the impact of this functional definition on the overall transportation system; (3) identify any unresolved issues concerning the interaction of the CMF with other elements of the transportation system; and (4) make recommendations to resolve any unresolved issues so that decisions can be made early in the transportation system planning process

  19. Breaker Maintenance: Volume 3, Molded-Case circuit breakers

    International Nuclear Information System (INIS)

    Davis, E.L.; Funk, D.L.

    1991-09-01

    Modeled-case circuit breakers (MCCBs) provide power and circuit protection in nuclear plant electrical distribution systems. Thus, their proper operation is essential to the safe and reliable operation of plant electrical distribution systems. This guide for both nuclear and non-nuclear power generating facilities will help improve the maintenance and reliability of MCCBs. The authors developed this guide to establish a working-level understanding of hardware performance trends, reliability, and failure modes from which maintenance practices could be specified. The first step in preparing this guide was an in-depth review of available operating experience and failure data, which was obtained from nuclear information sources such as EPRI's Nuclear Maintenance Applications Center. In addition, they evaluated some nonnuclear reliability data. Next, they investigated current industry practices, including a review of manufacturer's recommendations and numerous industry standards. Finally, they used the collective information to develop programmatic recommendations and, where appropriate, detailed inspection and test guidance. This guide offers many recommendations applicable to MCCB maintenance, such as an engineering description of MCCBs and their operation; an overview of reliability and failure data; programmatic recommendations, including inspection and test periodicity; detailed inspection and test guidance; and corrective maintenance recommendations. Supplementary information includes an overview of industry standards, a discussion of regulatory issues, and sample data sheets. An evaluation of operating experience indicates that a maintenance program need not be overly complicated to detect the predominant failure modes associated with MCCBs. Those implementating an MCCB maintenance and testing program, however, must recognize the inherent limitations associated with field-testing of these devices. 42 refs., 17 figs., 7 tabs

  20. Autonomous and professional maintenance in metallurgical enterprise as activities within total productive maintenance

    Directory of Open Access Journals (Sweden)

    B. Gajdzik

    2014-04-01

    Full Text Available The content of this publication consists of notions connected with Total Productive Maintenance (TPM in metallurgical enterprise. The basic areas of devices condition management through Autonomous and Professional Maintenance are described here. Mentioned areas of activities are performed in metallurgical enterprise ArcelorMittal Poland within pillars of World Class Manufacturing (WCM. The aims of UR programs are to maintain the basic functionality of the devices and decrease the number of failures in order to reach improvement of production efficiency.

  1. Simulation based comparison of predictive maintenance policies

    NARCIS (Netherlands)

    Tinga, Tiedo; Janssen, R.H.P.; Steenbergen, R.; van Gelder, P.

    2013-01-01

    When an asset is operated in variable conditions, its operational efficiency can be improved significantly when the maintenance is performed in a dynamic manner. This means that variations in usage and operating environment are taken into account when deciding on the length of the maintenance

  2. On reliability and maintenance modelling of ageing equipment in electric power systems

    International Nuclear Information System (INIS)

    Lindquist, Tommie

    2008-04-01

    Maintenance optimisation is essential to achieve cost-efficiency, availability and reliability of supply in electric power systems. The process of maintenance optimisation requires information about the costs of preventive and corrective maintenance, as well as the costs of failures borne by both electricity suppliers and customers. To calculate expected costs, information is needed about equipment reliability characteristics and the way in which maintenance affects equipment reliability. The aim of this Ph.D. work has been to develop equipment reliability models taking the effect of maintenance into account. The research has focussed on the interrelated areas of condition estimation, reliability modelling and maintenance modelling, which have been investigated in a number of case studies. In the area of condition estimation two methods to quantitatively estimate the condition of disconnector contacts have been developed, which utilise results from infrared thermography inspections and contact resistance measurements. The accuracy of these methods were investigated in two case studies. Reliability models have been developed and implemented for SF6 circuit-breakers, disconnector contacts and XLPE cables in three separate case studies. These models were formulated using both empirical and physical modelling approaches. To improve confidence in such models a Bayesian statistical method incorporating information from the equipment design process was also developed. This method was illustrated in a case study of SF6 circuit-breaker operating rods. Methods for quantifying the effect of maintenance on equipment condition and reliability have been investigated in case studies on disconnector contacts and SF6 circuit-breakers. The input required by these methods are condition measurements and historical failure and maintenance data, respectively. This research has demonstrated that the effect of maintenance on power system equipment may be quantified using available data

  3. Risk-based equipment removal guide for on-line maintenance at PSE ampersand G

    International Nuclear Information System (INIS)

    Knoll, A.; Smith, C.; Pollock, J.

    1995-01-01

    On-line maintenance plays an important role in achieving safe and reliable power generation in a nuclear power plant. However, maintenance, if not properly planned and performed, may also be an important contributor to plant risk. Therefore, plant-specific procedures are needed for equipment removal from service to enhance the benefits of on-line maintenance and minimize the risks involved. The problem is to identify and implement the most effective on-line maintenance policy in the form of a proceduralized guide to assure plant safety under various operation and maintenance constraints. This paper presents a methodology to develop plant-specific on-line maintenance strategies and acceptance criteria using a multivariate safety approach based on risk assessment. Based on plant-specific data as modeled in the individual plant evaluation (IPE) and the updated probabilistic safety assessment (PSA), the risk-based methodology is currently being applied to the development of proceduralized equipment removal guides at Hope Creek and Salem units 1 and 2 of Public Service Electric and Gas Company (PSE ampersand G)

  4. Health and safety conditions of building maintenance sites in Nigeria

    African Journals Online (AJOL)

    To identify the microorganisms, bulk samples were collected on timber buildings classified as maintenance sites over the country and then identify the microorganisms available using the cultivation technique. Eight hundred and fifty nutrient and Sabouraud dextrose agar dishes were prepared. The nutrient agar dishes were ...

  5. A Novel Idea for Optimizing Condition-Based Maintenance Using Genetic Algorithms and Continuous Event Simulation Techniques

    Directory of Open Access Journals (Sweden)

    Mansoor Ahmed Siddiqui

    2017-01-01

    Full Text Available Effective maintenance strategies are of utmost significance for system engineering due to their direct linkage with financial aspects and safety of the plants’ operation. At a point where the state of a system, for instance, level of its deterioration, can be constantly observed, a strategy based on condition-based maintenance (CBM may be affected; wherein upkeep of the system is done progressively on the premise of monitored state of the system. In this article, a multicomponent framework is considered that is continuously kept under observation. In order to decide an optimal deterioration stage for the said system, Genetic Algorithm (GA technique has been utilized that figures out when its preventive maintenance should be carried out. The system is configured into a multiobjective problem that is aimed at optimizing the two desired objectives, namely, profitability and accessibility. For the sake of reality, a prognostic model portraying the advancements of deteriorating system has been employed that will be based on utilization of continuous event simulation techniques. In this regard, Monte Carlo (MC simulation has been shortlisted as it can take into account a wide range of probable options that can help in reducing uncertainty. The inherent benefits proffered by the said simulation technique are fully utilized to display various elements of a deteriorating system working under stressed environment. The proposed synergic model (GA and MC is considered to be more effective due to the employment of “drop-by-drop approach” that permits successful drive of the related search process with regard to the best optimal solutions.

  6. Safe sex

    Science.gov (United States)

    ... sex; Sexually transmitted - safe sex; GC - safe sex; Gonorrhea - safe sex; Herpes - safe sex; HIV - safe sex; ... contact. STIs include: Chlamydia Genital herpes Genital warts Gonorrhea Hepatitis HIV HPV Syphilis STIs are also called ...

  7. Comparison of maintenance, emergence and recovery characteristics of sevoflurane and desflurane in pediatric ambulatory surgery

    Directory of Open Access Journals (Sweden)

    Manish B Kotwani

    2017-01-01

    Conclusion: Desflurane provides faster emergence and recovery in comparison to sevoflurane when used for the maintenance of anesthesia through SGA in children. Both sevoflurane and desflurane can be safely used in children for lower abdominal surgeries.

  8. CALiPER Retail Lamps Study RRL3.2 Lumen and Chromaticity Maintenance of LED A lamps Operated in Steady-State Conditions

    Energy Technology Data Exchange (ETDEWEB)

    Royer, Michael P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); McCullough, Jeffrey J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tucker, Joseph C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-01

    The lumen depreciation and color shift of 17 different A lamps (15 LED, 1 CFL, 1 halogen) was monitored in the automated long-term test apparatus (ALTA) for more than 7,500 hours. Ten samples of each lamp model were tested, with measurements recorded on a weekly basis. The lamps were operated continuously at an ambient temperature of 45°C (-1°C). Importantly, the steady-state test conditions were not optimized for inducing catastrophic failure for any of the lamp technologies—to which thermal cycling is a strong contributor— and are not typical of normal use patterns—which usually include off periods where the lamp cools down. Further, the test conditions differ from those used in standardized long-term test methods (i.e., IES LM-80, IES LM-84), so the results should not be directly compared. On the other hand, the test conditions are similar to those used by ENERGY STAR (when elevated temperature testing is called for). Likewise, the conditions and assumptions used by manufacturers to generated lifetime claims may vary; the CALiPER long-term data is informative, but cannot necessarily be used to discredit manufacturer claims. The test method used for this investigation should be interpreted as one more focused on the long-term effects of elevated temperature operation, at an ambient temperature that is not uncommon in luminaires. On average, the lumen maintenance of the LED lamps monitored in the ALTA was better than benchmark lamps, but there was considerable variation from lamp model to lamp model. While three lamp models had average lumen maintenance above 99% at the end of the study period, two products had average lumen maintenance below 65%, constituting a parametric failure. These two products, along with a third, also exhibited substantial color shift, another form of parametric failure. While none of the LED lamps exhibited catastrophic failure—and all of the benchmarks did—the early degradation of performance is concerning, especially with a

  9. Method and computer program product for maintenance and modernization backlogging

    Science.gov (United States)

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  10. Maintenance Decision Making based on different types of data fusion

    OpenAIRE

    Galar, D.; Gustafson, A.; Tormos Martínez, Bernardo Vicente; Berges, Luis

    2012-01-01

    [EN] Over the last decade, system integration is applied more as it allows organizations to streamline business processes. A recent development in the asset engineering management is to leverage the investment already made in process control systems. This allows the operations, maintenance, and process control teams to monitor and determine new alarm level based on the physical condition data of the critical machines. Condition-based maintenance (CBM) is a maintenance philosophy base...

  11. Paper number: ID 576... Monitoring and maintenance of pumps in LWR

    International Nuclear Information System (INIS)

    Heller, M.; Einzmann, K.

    2001-01-01

    Due to the liberalization of the European Market for electrical power nuclear power plants are progressively subjected to high pressure in respect of reducing the overall costs including for maintenance actions. This concerns also the maintenance of active components as pumps or valves. Siemens Nuclear Power (SNP) has developed a concept for the transition to an integrated condition based maintenance especially for pumps which shall be presented below. It is proposed to make up future decisions on maintenance of pumps only depending on condition data of the component. The concept must be supported by modern monitoring systems, which shall be installed at pumps which are relevant for the safety and availability of the plants. The main technical features of the SNP monitoring system DIROM are presented in detail as an example. First results of acquiring condition related data of a nuclear feed water pump are reported too. The new maintenance concept promises attractive cost benefits in comparison to a former preventive maintenance concept. (author)

  12. Job analysis of the maintenance supervisor and instrument and control supervisor positions for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Bartter, W.D.; Siegel, A.I.; Federman, P.J.

    1982-11-01

    The present report presents the results of an analysis of the jobs of maintenance mechanic supervisors and instrument and control technician supervisors in nuclear power plants. Such an analysis was considered to be a necessary step in defining the scope and focus of a model for predicting and analyzing nuclear power maintenance reliability. The model will focus upon tasks and subtasks performed by various job positions. The results of this job analysis, along with the results of a survey of user needs vis-a-vis such a model and the results of parallel analyses of the job of maintenance mechanics and of instrument and control technicians provide the sound foundation on which such a model may be built. Job analysis possesses implications for a number of purposes. It provides insight into selection standards, job structuring and organization, performance analysis, training objective establishment, and training content derivation. Accordingly, the results of the present work possess implications for a variety of interest areas relative to safe and efficient operation of nuclear power plants

  13. Experimental study on the plant state estimation for the condition-based maintenance

    International Nuclear Information System (INIS)

    Harada, J. I.; Takahashi, M.; Kitamura, M.; Wakabayashi, T.

    2006-01-01

    A framework of maintenance support system based on the plant state estimation using diverse methods has been proposed and the validity of the plant state estimation methods has been experimentally evaluated. The focus has been set on the construction of the BN for the objective system with the scale and complexity as same as real world systems. Another focus has been set on the other functions for maintenance support system such as signal processing tool and similarity matching. The validity of the proposed inference method has been confirmed through numerical experiments. (authors)

  14. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    International Nuclear Information System (INIS)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP's current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes

  15. Reliability centred maintenance of nuclear power plant facilities

    International Nuclear Information System (INIS)

    Kovacs, Zoltan; Novakova, Helena; Hlavac, Pavol; Janicek, Frantisek

    2011-01-01

    A method for the optimization of preventive maintenance nuclear power plant equipment, i.e. reliability centred maintenance, is described. The method enables procedures and procedure schedules to be defined such as allow the maintenance cost to be minimized without compromising operational safety or reliability. Also, combinations of facilities which remain available and ensure reliable operation of the reactor unit during the maintenance of other pieces of equipment are identified. The condition-based maintenance concept is used in this process, thereby preventing unnecessary operator interventions into the equipment, which are often associated with human errors. Where probabilistic safety assessment is available, the most important structures, systems and components with the highest maintenance priority can be identified. (orig.)

  16. Safe interruption of maintenance therapy against previous infection with four common HIV-associated opportunistic pathogens during potent antiretroviral therapy

    DEFF Research Database (Denmark)

    Kirk, Ole; Reiss, Peter; Uberti-Foppa, Caterina

    2002-01-01

    maintenance therapy for cytomegalovirus (CMV) end-organ disease, disseminated Mycobacterium avium complex (MAC) infection, cerebral toxoplasmosis, and extrapulmonary cryptococcosis in patients receiving antiretroviral therapy. DESIGN: Observational study. SETTING: Seven European HIV cohorts. PATIENTS: 358...... identified: 162 for CMV disease, 103 for MAC infection, 75 for toxoplasmosis, and 39 for cryptococcosis. During 781 person-years of follow-up, five patients had relapse. Two relapses (one of CMV disease and one of MAC infection) were diagnosed after maintenance therapy was interrupted when the CD4 lymphocyte....... One relapse (toxoplasmosis) was diagnosed after maintenance therapy interruption at a CD4 lymphocyte count greater than 200 x 10(6) cells/L for 15 months. The overall incidences of recurrent CMV disease, MAC infection, toxoplasmosis, and cryptococcosis were 0.54 per 100 person-years (95% CI, 0.07 to 1...

  17. National Synchrotron Light Source Facility Manual Maintenance Management Program. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Fewell, N.

    1993-12-01

    The purpose of this program s to meet the policy and objectives for the management and performance of cost-effective maintenance and repair of the National Synchrotron Light Source, as required by the US Department of Energy order DOE 433O.4A. It is the DOE`s policy that: The maintenance management program for the NSLS be consistent with this Order and that NSLS property is maintained in a manner which promotes operational safety, worker health, environmental protection and compliance, property preservation, and cost-effectiveness while meeting the NSLS`s programmatic mission. Structures, components and systems (active and passive) that are imporant to safe operation of the NSLS shall be subject to a maintenance program to ensure that they meet or exceed their design requirements throughout the life of the NSLS. Periodic examination of structures, systems components and equipment be performed to determine deterioration or technical obsolescence which may threaten performance and/or safety. Primary responsibility, authority, and accountability for the direction and management of the maintenance program at the NSLS reside with the line management assigned direct programmatic responsibility. Budgeting and accounting for maintenance programs are consistent with DOE Orders guidance.

  18. Sustainability of arsenic mitigation interventions – an evaluation of different alternative safe drinking water options provided in Matlab, an arsenic hot spot in Bangladesh

    Directory of Open Access Journals (Sweden)

    MOHAMMED eHOSSAIN

    2015-05-01

    Full Text Available The wide spread occurrence of geogenic arsenic (As in Bangladesh groundwater drastically reduced the safe water access across the country. Since its discovery in 1993, different mitigation options tested at household and community scale have resulted in limited success. In an arsenic hotspot of southeastern Bangladesh, 841 arsenic removal filter (ARF, 190 surface water filter membrane, 23 pond sand filter (PSF, 147 rain water harvester (RWH and 59 As-safe tubewell were distributed among the severely exposed population by AsMat, a Sida supported project. After three-four years of providing these safe water options, this study was carried out during 2010-2011 for performance analysis of these options, in terms of technical viability and effectiveness and thus to evaluate the preference of different options to the end users. Household and community based surveys were done to make an assessment of the current water use pattern as impact of the distributed options, overall condition of the options provided and to identify the reasons why these options are in use and/or abandoned. In total, 284 households were surveyed and information was collected for 23 PSF, 147 RWH and 59 tubewells. None of the filters was found in use. Among other options distributed, 13% of PSF, 40% RWH and 93% of tubewell were found functioning. In all cases, tubewells were found As-safe. About 89% of households are currently using tubewell water which was 58% before. Filter was abandoned for high cost and complicated maintenance. The use of RWH and PSF was not found user friendly and ensuring year round water quality is a big challenge. Arsenic-safe tubewell was found as a widely accepted option mainly because of its easy operation and availability of water, good water quality and negligible maintenance. This study validated tubewell as the most feasible option and holds significance for planning water supply projects, improving mitigation policy as well as developing awareness

  19. Performance Assessment of Maintenance Practices in Government Office Buildings: Case Study of Parcel E, Putrajaya

    Directory of Open Access Journals (Sweden)

    Awg Husaini A.I.

    2014-03-01

    Full Text Available Building maintenance practices must be taken into consideration by building facility managers or building owners. They involve daily operations to ensure that end users can work or live comfortably and safely. Through effective maintenance practices, the functions of the existing building facilities can be maintained and meet the needs of the building users. Maintenance practices must be effective in aspects such as planning, organization and supervision in order to maintain the building at a satisfactory level of performance all the time. A study was conducted on a Federal government office building in Parcel E, Putrajaya to determine the maintenance aspects of the management of the facility. To achieve the objectives of this study a questionnaire survey was used to obtain the required data. The outcomes indicate that the aspects of building maintenance practice and the effectiveness of the maintenance management in government office buildings can influence the satisfaction of the end user. However, some aspects of the current building maintenance practices seem to need improvements in order to enhance the building maintenance management. The recommendations of this study will help in the effective management of the facility and maintenance management practices.

  20. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  1. Generic maintenance immunosuppression in solid organ transplant recipients.

    Science.gov (United States)

    Ensor, Christopher R; Trofe-Clark, Jennifer; Gabardi, Steven; McDevitt-Potter, Lisa M; Shullo, Michael A

    2011-11-01

    Survival after solid organ transplantation has increased in the era of tacrolimus and mycophenolate. This increased survival could be due in part to the broad clinical use of these potent and specific agents for maintenance immunosuppression. These drugs have enhanced specificity and potency for T and B lymphocytes compared with their predecessors, cyclosporine and azathioprine. Between 2008 and 2010, the United States Food and Drug Administration approved several generic formulations of both tacrolimus and mycophenolate mofetil. Deciding whether generic products can be safely substituted for the innovator product is a clinical dilemma similar to that which occurred when generic formulations of cyclosporine became available. We describe the concerns regarding generic immunosuppression use, summarize expert opinion and consensus statements in transplantation, analyze the potential impact of generic substitution, and provide estimates of populations affected based on generic drug market penetration. Formulary considerations such as cost, availability, and potential drug ordering and drug selection errors are described, and transplant coordinator and patient perspectives are reviewed. Finally, general recommendations about the use of generic maintenance immunosuppression in solid organ transplant recipients are provided. Although more research is needed to confirm clinical and therapeutic equivalence and pharmacoeconomic benefit, generic immunosuppressants can be safely substituted for innovator products as long as patients consistently receive the same product, patients and clinicians are aware of when substitutions occur, and enhanced therapeutic drug monitoring is provided during the transition.

  2. The construction of power grid operation index system considering the risk of maintenance

    Science.gov (United States)

    Tang, Jihong; Wang, Canlin; Jiang, Xinfan; Ye, Jianhui; Pan, Feilai

    2018-02-01

    In recent years, large-scale blackout occurred at home and abroad caused widespread concern about the operation of the grid in the world, and the maintenance risk is an important indicator of grid safety. The barrier operation of the circuit breaker exists in the process of overhaul of the power grid. The operation of the different barrier is of great significance to the change of the power flow, thus affecting the safe operation of the system. Most of the grid operating status evaluation index system did not consider the risk of maintenance, to this end, this paper from the security, economy, quality and cleanliness of the four angles, build the power grid operation index system considering the risk of maintenance.

  3. A VITAL service for predictive MOV maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Motor-operated valve (MOV) maintenance can be a major contributor to unplanned plant downtime, either because valve malfunctions cause unscheduled outages, or because unnecessary valve maintenance lengthens scheduled outages. The cause of both situations is a preventive approach to valve maintenance, where maintenance is scheduled according to a timetable instead of according to a demonstrated need. To move towards a predictive maintenance approach, inexpensive methods of collecting and diagnosing real-time data on the conditions of a valve must be made available. Such a system must be capable of detecting and diagnosing degrading mechanical and electrical behaviour at an early stage, as well as being able to predict the time of failure. Without this data, a predictive approach to maintenance is impossible. Westinghouse is addressing the requirements for a predictive approach to MOV maintenance with the introduction of a third-generation of diagnostic systems for motor-operated valves -the portable Valve Intelligent Test and Analysis System (VITALS) and the on-line Valve Monitoring System (VMS). (author)

  4. Knowledge engineering thinking of maintenance

    International Nuclear Information System (INIS)

    2007-01-01

    Maintenance optimization problem could not always settled mathematically and was obliged to use quasi-optimum solution with omitting non-formulated limiting condition or neglecting part of optimization object. In such a case knowledge engineering thinking was encouraged. Maintenance of complicated plant and artificial system should be considered from artificial object (equipment/facility hardware and system), technical information and knowledge base, and organizational and human aspect or society and institution. Comprehensive management system in organization and society was necessary not only for assuring integrity of equipment but also for attaining higher performance, reliability and economics of system. For better judgment it was important to share mechanism to make use of more information with organization or whole society. It was required to create database and data mining for knowledge base management system of maintenance. Maintenance was called 'last fortress' to assure quality such as reliability and safety of required function of equipment. Strategic approach to develop maintenance technology under cooperation was considered. Life extension R and D road map was launched in 2005. (T. Tanaka)

  5. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  6. Analysis of the interim safe storage of reactors at the Hanford site

    International Nuclear Information System (INIS)

    Wang Hailiang

    2014-01-01

    The nine production reactors, i.e. B, C, D, DR, F, H, KE, KW and N, at the Hanford site are all water-cooled and graphite-moderated reactors with natural uranium fuel. In 1993, the U.S. Department of Energy (DOE) decided to put eight production reactors (except for B) into Interim Safe Storage (ISS) for 75 years followed by deferred one-piece removal. Reactor B will remain as a national historical landmark. By the end of 2013, six reactors C, F, D, DR, H and N had been successfully put into the ISS. Reactors KE and KW will be put into the ISS in the coming years. Taking reactor C as an example, this paper mainly talks about how to put the production reactors in the Interim Safe Storage, e.g. how to make site preparation, how to construct the safe storage enclosure (SSE) and how to perform surveillance and maintenance during the ISS period, etc. (authors)

  7. Special training of craftsmen for maintenance and repair

    International Nuclear Information System (INIS)

    Scholz, H.E.

    1981-01-01

    The most important prerequisites for keeping nuclear power plants running safely and consistently are the reliable plant supervision and control by operators and shift engineers and its permanent servicing and maintenance as well as the performance of qualified repair work. Therefore, sophisticated training of qualified labour in the fields of mechanical engineering, electrical engineering and instrumentation and control is as important as of operators and shift engineers. The objectives of the relevant training measures for the personnel mentioned above are: Acquisition of solid basic skills in the respective professions, development of a broad background in how nuclear power plants are designed and function, gaining a sound insight into the working procedures in nuclear power plants, maintenance planning, duties and responsibilities of personnel involved, and acquiring thorough knowledge of the systems and its components, the assigned staff will be responsible for. (orig./RW)

  8. Development of a daily maintenance work management system for nuclear power plants

    International Nuclear Information System (INIS)

    Yoshimura, Sadanori; Maita, Keikichi; Ogawa, Koutaro; Tabata, Nobuyuki; Shibuya, Shinya

    1999-01-01

    Maintenance work plays an important role in keeping the safety and reliability of nuclear power plants. Especially, with the recent trends of reducing the outage length, safe and reliable execution of maintenance work is more earnestly required than ever. Taking this situation into account, a daily maintenance work management system has been developed to support the execution of maintenance work for nuclear power plants. This system supports maintenance personnel in writing and approving the daily work instruction sheet and reduces their workload by providing predetermined lists of items necessary for filling up the sheet and by applying an electronic approval procedure. It also provides information through a computer network to improve the communication among maintenance personnel. For work steps to be treated in the daily work instruction sheet, an analysis was made to identify potential human errors and related counter measures, which were then linked to safety and quality assurance instructions of the sheet. Based on this information, the system automatically presents the safety and quality assurance instructions related to the work content listed in the sheet to improve the appropriateness of the instructions. A prototype of the daily maintenance work management system was developed and a trial use was made for actual periodic maintenance work at a nuclear power plant. This experience shows the usefulness of the system in reducing the workload of maintenance personnel and in providing safer work instructions. (author)

  9. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  10. A predictive maintenance approach for improved nuclear plant availability

    International Nuclear Information System (INIS)

    Verma, R.M.P.; Pandya, M.B.; Kini, M.P.

    1979-01-01

    Predictive maintenance programme as against preventive maintenance programme aims at diagnosing, inspecting, monitoring, and objective condition-checking of equipment. It helps in forecasting failures, and scheduling the optimal frequencies for overhauls, replacements, lubrication etc. It also helps in establishing work load, manpower, resource planning and inventory control. Various stages of predictive maintenance programme for a nuclear power plant are outlined. A partial list of instruments for predictive maintenance is given. (M.G.B.)

  11. Design of casks: incorporating operational feedback from maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Bimet, F.; Hartenstein, M. [COGEMA Logistics, Saint Quentin (France)

    2004-07-01

    Casks are designed to conform to regulations and to client specifications. Essential areas such as easy operation, low costs of maintenance, low operation and maintenance doses, limited waste, are not explicitly covered. Notwithstanding, COGEMA LOGISTICS uses all feedback available, so that casks are designed to be easy, safe and economical to operate and maintain. Maintenance is an activity where you do spot items that old-time designers could have made better, and things that users should not have done. Thanks to quality assurance, there are a number of data available, waiting to be collected and exploited; they have to be identified, located, retrieved, and analysed. Using information such as wear, damage, use of spare parts, access problems helps to make casks ever better. It leads to more efficient concepts, and to upgrades on existing designs; it also allows to integrate environmental considerations, inter alia in the choice of materials and in maintenance methods. It is necessary for the designer to interact with the users, the cask owners, the maintenance providers, in order to gather all relevant information and events. This is made easier when all these actors are ''under one roof'', or have very close ties. This paper presents COGEMA LOGISTICS methods for collecting and analysing all these experiences waiting to be used. It explains our process for analysing data, preparing yearly reports that are made available to our designers. It describes how each new design is subject to a maintainability study, using this feedback, so that the cask safety is always assured, that radiological doses are kept to a minimum, and that operating and maintenance costs will remain as low as possible.

  12. Design of casks: incorporating operational feedback from maintenance

    International Nuclear Information System (INIS)

    Bimet, F.; Hartenstein, M.

    2004-01-01

    Casks are designed to conform to regulations and to client specifications. Essential areas such as easy operation, low costs of maintenance, low operation and maintenance doses, limited waste, are not explicitly covered. Notwithstanding, COGEMA LOGISTICS uses all feedback available, so that casks are designed to be easy, safe and economical to operate and maintain. Maintenance is an activity where you do spot items that old-time designers could have made better, and things that users should not have done. Thanks to quality assurance, there are a number of data available, waiting to be collected and exploited; they have to be identified, located, retrieved, and analysed. Using information such as wear, damage, use of spare parts, access problems helps to make casks ever better. It leads to more efficient concepts, and to upgrades on existing designs; it also allows to integrate environmental considerations, inter alia in the choice of materials and in maintenance methods. It is necessary for the designer to interact with the users, the cask owners, the maintenance providers, in order to gather all relevant information and events. This is made easier when all these actors are ''under one roof'', or have very close ties. This paper presents COGEMA LOGISTICS methods for collecting and analysing all these experiences waiting to be used. It explains our process for analysing data, preparing yearly reports that are made available to our designers. It describes how each new design is subject to a maintainability study, using this feedback, so that the cask safety is always assured, that radiological doses are kept to a minimum, and that operating and maintenance costs will remain as low as possible

  13. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Poderis, Reed J. [NSTec; King, Rebecca A. [NSTec

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  14. Routine maintenance: safety term based work selection; Selecao de trabalho baseado no prazo seguro

    Energy Technology Data Exchange (ETDEWEB)

    Camargo, Albair de; Filho, Antnio S.; Brendler, Fabiano E.; Adamatti, Gilberto A.; Naruto, Itiro; Araujo, Luiz C.F.; Puerari, Roberto [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    This work has objective to present the experience of improvement of routine maintenance system in some refineries of the PETROBRAS system, with the purpose to increase the efficiency in the Industrial Maintenance Management (cost), Utilization and HSE (Health, Safety and Environment), key of success of a petroleum company. The new system is based on the implantation of the culture of work selection in the safe period, through elaboration of new maintenance procedure, with emphasis in decisions shared between Operation and Maintenance Team, resulting in reduction of emergencies, making possible contract of services of maintenance for packages and improved allocation of resources. This work treat about improvement of the system in use, in view of that it has already taken in consideration the consequence of fail in the maintenance with participation of the operators. Besides of these challenge, this modification was made without causing riots in the process of implantation of SAP. As main result, financial profits had got better of resources with increase of safety, considering that they are analyzed in a way it that systematized potential risks. (author)

  15. Reliability-centered maintenance for ground-based large optical telescopes and radio antenna arrays

    Science.gov (United States)

    Marchiori, G.; Formentin, F.; Rampini, F.

    2014-07-01

    In the last years, EIE GROUP has been more and more involved in large optical telescopes and radio antennas array projects. In this frame, the paper describes a fundamental aspect of the Logistic Support Analysis (LSA) process, that is the application of the Reliability-Centered Maintenance (RCM) methodology for the generation of maintenance plans for ground-based large optical telescopes and radio antennas arrays. This helps maintenance engineers to make sure that the telescopes continue to work properly, doing what their users require them to do in their present operating conditions. The main objective of the RCM process is to establish the complete maintenance regime, with the safe minimum required maintenance, carried out without any risk to personnel, telescope and subsystems. At the same time, a correct application of the RCM allows to increase the cost effectiveness, telescope uptime and items availability, and to provide greater understanding of the level of risk that the organization is managing. At the same time, engineers shall make a great effort since the initial phase of the project to obtain a telescope requiring easy maintenance activities and simple replacement of the major assemblies, taking special care on the accesses design and items location, implementation and design of special lifting equipment and handling devices for the heavy items. This maintenance engineering framework is based on seven points, which lead to the main steps of the RCM program. The initial steps of the RCM process consist of: system selection and data collection (MTBF, MTTR, etc.), definition of system boundaries and operating context, telescope description with the use of functional block diagrams, and the running of a FMECA to address the dominant causes of equipment failure and to lay down the Critical Items List. In the second part of the process the RCM logic is applied, which helps to determine the appropriate maintenance tasks for each identified failure mode. Once

  16. Ventilation: Exploitation and maintenance. Ten years of experience

    International Nuclear Information System (INIS)

    Letertre, J.

    1990-01-01

    The evolution and the maintenance operations performed during the last ten years on the ventilation-air-conditioning system at the Hague plant are presented. The modifications operated in the ventilation-air-conditioning system were carried out in order to answer the safety requirements evolution due to the increase of the plant productivity. The choice and the results of the maintenance policies, defined as a function of the safety, quality and cost requirements, are presented [fr

  17. Developing optimized prioritizing road maintenance

    Directory of Open Access Journals (Sweden)

    Ewadh Hussein Ali

    2018-01-01

    Full Text Available Increased demand for efficient maintenance of the existing roadway system needs optimal usage of the allocated funds. The paper demonstrates optimized methods for prioritizing maintenance implementation projects. A selected zone of roadway system in Kerbala city represents the study area to demonstrate the application of the developed prioritization process. Paver system PAVER integrated with GIS is used to estimate and display the pavement condition index PCI, thereby to establish a priority of maintenance. In addition to simple ranking method by PCI produced by the output of PAVER, the paper introduces PCI measure for each section of roadway. The paper introduces ranking by multiple measures investigated through expert knowledge about measures that affect prioritization and their irrespective weights due to a predesigned questionnaire. The maintenance priority index (MPI is related to cost of suitable proposed maintenance, easiness of proposed maintenance, average daily traffic and functional classification of the roadway in addition to PCI. Further, incremental benefit-cost analysis ranking provide an optimized process due to benefit and cost of maintenance. The paper introduces efficient display of layout and ranking for the selected zone of roadway system based on MPI index and incremental BCR method. Although the two developed methods introduce different layout display for priority, statistical test shows that no significant difference between ranking of all methods of prioritization.

  18. The application and practice of predictive maintenance at CANDU equipment management

    International Nuclear Information System (INIS)

    Yu Guangting

    2014-01-01

    The equipment in Qinshan CANDU unit is characterized by large number and complex structure. Some equipment failure has no relation with the operation time, it is impossible to avoid the failure of these equipment only by periodical maintenance. To improve the equipment reliability, increase the equipment usability and decrease the maintenance cost, for important equipment related to nuclear safety and generating electricity, it is required to perform condition monitoring and the predictive maintenance (PdM). According to different characteristics of equipment, it is required to use suitable equipment condition monitoring method, content and frequency. In this way, some potential equipment failure can be found, preventive maintenance can be arranged in advance, and equipment maintenance management can be optimized. (author)

  19. Pre-conceptual design assessment of DEMO remote maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Loving, A., E-mail: antony.loving@ccfe.ac.uk [EURATOM/Culham Center Fusion Energy, Culham Science Centre, OX14 3DB, Abingdon (United Kingdom); Crofts, O.; Sykes, N.; Iglesias, D.; Coleman, M.; Thomas, J. [EURATOM/Culham Center Fusion Energy, Culham Science Centre, OX14 3DB, Abingdon (United Kingdom); Harman, J. [EFDA Close Support Unit Garching, Boltzmannstaße 2, D-85748 Garching Bei München (Germany); Fischer, U. [Karlsruhe Institute of Technology, Institute for Neutron Physics and Reactor Technology, Hermann-von-Helmholtz-Platz 1, D-76344 Eggenstein-Leopoldshafen (Germany); Sanz, J. [Instituto de Fusión Nuclear/UPM, Madrid (Spain); Siuko, M. [VTT Technical Research Centre of Finland, P.O. Box 1000, FI-02044 VTT (Finland); Mittwollen, M. [Karlsruhe Institute of Technology, Institut für Fördertechnik und Logistiksysteme, Gotthard-Franz-Straße 8, Geb.50.38, 76131 Karlsruhe (Germany)

    2014-10-15

    EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/2013, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally valuable in communicating the complexity and scale of the required operations. Through these simulations, estimates of the maintenance task durations have been possible demonstrating that a full replacement of the blankets within 6 months could be achieved. The design of the first wall, including the need to use sacrificial limiters must still be investigated. In support of the maintenance operations, a first indication of the requirements of an Active Maintenance Facility (AMF) has been elaborated.

  20. Development and performance evaluation of a prototype system for prediction of the group error at the maintenance work

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko

    2000-01-01

    In order to attain zero-izing of much more error rather than it can set to a nuclear power plant, Authors development and its system-izing of the error prediction causal model which predicts group error action at the time of maintenance work were performed. This prototype system has the following feature. (1) When a user inputs the existence and the grade of the existence of the 'feature factor of the maintenance work' as a prediction object, 'an organization and an organization factor', and a 'group PSF (Performance Shaping Factor) factor' into this system. The maintenance group error to target can be predicted through the prediction model which consists of a class of seven stages. (2) This system by utilizing the information on a prediction result database, it can use not only for prediction of a maintenance group error but for various safe activity, such as KYT (dangerous forecast training) and TBM (Tool Box Meeting). (3) This system predicts a cooperation error' at highest rate, and, subsequently predicts the detection error' at a high rate. And to the 'decision-making error', the transfer error' and the 'state cognitive error', it has the characteristic predicted at almost same rate. (4) If it has full knowledge even of the features, such as the enforcement conditions of maintenance work, and organization, even if the user has neither the knowledge about a human factor, nor experience, anyone of this system is slight about the existence, its extent, etc. of generating of a maintenance group error made difficult from the former logically and systematically easily, it can predict in business time for about 15 minutes. (author)

  1. On the Use of Time-Limited Information for Maintenance Decision Support: A Predictive Approach under Maintenance Constraints

    Directory of Open Access Journals (Sweden)

    E. Khoury

    2013-01-01

    Full Text Available This paper deals with a gradually deteriorating system operating under an uncertain environment whose state is only known on a finite rolling horizon. As such, the system is subject to constraints. Maintenance actions can only be planned at imposed times called maintenance opportunities that are available on a limited visibility horizon. This system can, for example, be a commercial vehicle with a monitored critical component that can be maintained only in some specific workshops. Based on the considered system, we aim to use the monitoring data and the time-limited information for maintenance decision support in order to reduce its costs. We propose two predictive maintenance policies based, respectively, on cost and reliability criteria. Classical age-based and condition-based policies are considered as benchmarks. The performance assessment shows the value of the different types of information and the best way to use them in maintenance decision making.

  2. Reliability study: maintenance facilities Portsmouth Gaseous Diffusion Plant

    International Nuclear Information System (INIS)

    Post, B.E.; Sikorski, P.A.; Fankell, R.; Johnson, O.; Ferryman, D.S.; Miller, R.L.; Gearhart, E.C.; Rafferty, M.J.

    1981-08-01

    A reliability study of the maintenance facilities at the Portsmouth Gaseous Diffusion Plant has been completed. The reliability study team analyzed test data and made visual inspections of each component contributing to the overall operation of the facilities. The impacts of facilities and equipment failures were given consideration with regard to personnel safety, protection of government property, health physics, and environmental control. This study revealed that the maintenance facilities are generally in good condition. After evaluating the physical condition and technology status of the major components, the study team made several basic recommendations. Implementation of the recommendations proposed in this report will help assure reliable maintenance of the plant through the year 2000

  3. Modeling of the maintenance policy of an offshore wind farm

    International Nuclear Information System (INIS)

    Maddens, L.; Labeau, P.E.

    2004-01-01

    Wind energy has a key position in the market of renewable electricity production means. Offshore wind farms offer additional surfaces to exploit this form of energy, together with more favourable wind conditions. Yet offshore windmills ask for higher investment and maintenance costs. Optimising the latter costs should therefore turn out to be particularly beneficial for this technology. The present paper summarizes the main modelling aspects of the maintenance of a typical offshore wind farm, such as the accessibility of the wind turbines and the impact of weather conditions, the cost of the different transport resources, the number of maintenance teams, a tolerated unavailability of part of the windmills, the opportunity to combine corrective and preventive maintenance actions on one or several windmills. All these features were embedded in a Petri net model of the maintenance policy of the farm, allowing to estimate the maintenance costs entailed by several strategies. Advantages and drawbacks of using Petri nets for the modelling of such a maintenance strategy are finally discussed. (authors)

  4. Maintenance implementation plan for the B Plant/WESF. Revision 4

    International Nuclear Information System (INIS)

    Tritt, S.E.; Lueck, B.H.

    1996-01-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of its operating systems are required to accomplish the current B Plant/WESF mission. B Plant/WESF are each considered a nuclear facility due to the storage of cesium and strontium capsules at WESF and the large radiological inventory from past processing

  5. Enhanced human performance of utility maintenance programs

    International Nuclear Information System (INIS)

    Fresco, A.; Haber, S.; O'Brien, J.

    1993-01-01

    Assuring the safe operation of a nuclear power plant depends, to a large extent, on how effectively one understands and manages the aging-related degradation that occurs in structures, systems, and components (SSCs). Aging-related degradation is typically managed through a nuclear plant's maintenance program. A review of 44 Maintenance Team Inspection (MTI) Reports indicated that while some plant organizations appeared to assume a proactive mode in preventing aging-related failures of their SSCs important to safety, others seemed to be taking a passive or reactive mode. Across all plants, what is clearly needed, is a strong recognition of the importance of aging-related degradation and the use of existing organizational assets to effectively detect and mitigate those effects. Many of those assets can be enhanced by the consideration of organizational and management factors necessary for the implementation of an effective aging management program. This report provides a discussion of this program

  6. Simulated maintenance a virtual reality

    International Nuclear Information System (INIS)

    Lirvall, P.

    1995-01-01

    The article describes potential applications of personal computer-based virtual reality software. The applications are being investigated by Atomic Energy of Canada Limited's (AECL) Chalk River Laboratories for the Canadian deuterium-uranium (Candu) reactor. Objectives include: (1) reduction of outage duration and improved safety, (2) cost-effective and safe maintenance of equipment, (3) reduction of exposure times and identification of overexposure situations, (4) cost-effective training in a virtual control room simulator, (5) human factors evaluation of design interface, and (6) visualization of conceptual and detailed designs of critical nuclear field environments. A demonstration model of a typical reactor control room, the use of virtual reality in outage planning, and safety issues are outlined

  7. Maintenance related to life management: Survey and control of equipment ageing

    International Nuclear Information System (INIS)

    Hevia Ruperez, F.

    2000-01-01

    The aim of this paper is to review relevant objectives and aspects of the Maintenance Evaluation and Improvement Programmes for Nuclear Power Plant Life Management. Recent experience shows that current maintenance practice often fails to directly address long-term degradation that affects singular plant components and equipment populations. Instead, delayed attention to the consequences makes good Life Management unfeasible. This has brought about the need for specific Maintenance Evaluation and Improvement Programmes to adjust to the basic objective of Life Management which is to protect against, mitigate and/or monitor ageing that affects the safe, profitable life of the facility. The paper analyses the methodologies used, incidents during their application and the main conclusions reached from the implementation of these programmes in Spanish nuclear power plants. Special attention is paid to recommended solutions for improving the efficiency of the utility's contributions, its leadership in task development and integration, and its interfaces with organisations specialised in providing services that support Life Management Programmes. The coexistence of these and other similar maintenance programmes make it necessary to integrate tasks to optimise effort and tools. The paper analyses the guidelines to be considered when integrating these Programmes with other maintenance optimisation programmes (economy and feasibility, RCM) and with tasks derived from the application of Maintenance Rule regulatory requirements. Lastly, the paper reports on the state of these Maintenance Evaluation and Improvement Programmes, their development, what prospects they have, and the Industry's initiative and actions concerning the matter. (author)

  8. Perspective of the Westinghouse steam generator secondary side maintenance approach

    Energy Technology Data Exchange (ETDEWEB)

    Ramaley, D. [Westinghouse Electric Company LLC, Cranberry Township, Pennsylvania (United States)

    2012-07-01

    Historically, Westinghouse had developed a set of steam generator secondary maintenance guidelines focused around performing recurring activities each outage without direct regards to the age, deposit loading, operational status, or corrosion status of the steam generator. Through the evolution of steam generator design and steam generator condition data, Westinghouse now uses a proactive assessment and planning approach for utilities. Westinghouse works with utilities to develop steam generator secondary maintenance plans for long term steam generator viability. Westinghouse has developed a portfolio of products to allow utilities to optimize steam generator operability and develop programs aimed at maintaining the steam generator secondary side in a favorable condition for successful long term operation. Judicious use of the means available for program development should allow for corrosion free operation, long term full power operation at optimum thermal efficiency, and leveling of outage expenditures over a long period of time. This paper will review the following required elements for an effective steam generator secondary side strategy: • Assessment: In order to develop an appropriate maintenance strategy, actions must be taken to obtain an accurate picture of the SG secondary side condition. • Forecasting: Using available data predictions are developed for future steam generator conditions and required maintenance actions. • Action: Cost effective engineering and maintenance actions must be completed at the appropriate time as designated by the plan. • Evaluation of Results: Following execution of maintenance tactics, it is necessary to revise strategy and develop technology enhancements as appropriate. (author)

  9. Human Error Probability Assessment During Maintenance Activities of Marine Systems

    Directory of Open Access Journals (Sweden)

    Rabiul Islam

    2018-03-01

    Full Text Available Background: Maintenance operations on-board ships are highly demanding. Maintenance operations are intensive activities requiring high man–machine interactions in challenging and evolving conditions. The evolving conditions are weather conditions, workplace temperature, ship motion, noise and vibration, and workload and stress. For example, extreme weather condition affects seafarers' performance, increasing the chances of error, and, consequently, can cause injuries or fatalities to personnel. An effective human error probability model is required to better manage maintenance on-board ships. The developed model would assist in developing and maintaining effective risk management protocols. Thus, the objective of this study is to develop a human error probability model considering various internal and external factors affecting seafarers' performance. Methods: The human error probability model is developed using probability theory applied to Bayesian network. The model is tested using the data received through the developed questionnaire survey of >200 experienced seafarers with >5 years of experience. The model developed in this study is used to find out the reliability of human performance on particular maintenance activities. Results: The developed methodology is tested on the maintenance of marine engine's cooling water pump for engine department and anchor windlass for deck department. In the considered case studies, human error probabilities are estimated in various scenarios and the results are compared between the scenarios and the different seafarer categories. The results of the case studies for both departments are also compared. Conclusion: The developed model is effective in assessing human error probabilities. These probabilities would get dynamically updated as and when new information is available on changes in either internal (i.e., training, experience, and fatigue or external (i.e., environmental and operational conditions

  10. C-SAFE: A Computer-Delivered Sexual Health Promotion Program for Latinas.

    Science.gov (United States)

    Klein, Charles H; Kuhn, Tamara; Altamirano, Midori; Lomonaco, Carmela

    2017-07-01

    This article describes the development and evaluation of C-SAFE (Sexual Awareness for Everyone), a computer-delivered sexual health promotion program for Latinas. We first describe the process of adapting an evidence-based, group-level intervention into an individually administered computer-delivered program. We then present the methods and results of a randomized control trial with 321 Latinas in California and Florida to test C-SAFE's preliminary efficacy in reducing sexual health risk. We found no statistically significant differences between the two conditions at a six-month follow-up in terms of sexual behaviors or attitudes toward sexually transmitted infections and condoms, although C-SAFE women reported fewer days in the past month when their mental health was not good (p = .02). C-SAFE condition women also reported more satisfaction than control condition women in their assessment of information presentation (on a scale of 1 = poor and 5 = excellent; C-SAFE = 4.45 vs. control = 4.25, p = .053) and having learned something new (C-SAFE = 95.1% vs. control = 79.3%, χ 2 importance of teachable moments, matching of delivery modalities to implementation contexts, and possible directions for evidence-based sexual health promotion programs given the current sexual health landscape.

  11. Florida maintenance rating program (MRP) assessment and enhancement : final report, May 28, 2008.

    Science.gov (United States)

    2008-05-28

    The Maintenance Rating Program (MRP), developed in 1985 by FDOT, is a statewide maintenance system aimed : at evaluating the State highway maintenance conditions, and determining FDOT asset maintenance needs. In the : quest for continuous improvement...

  12. Weight Maintenance with Litramine (IQP-G-002AS: A 24-Week Double-Blind, Randomized, Placebo-Controlled Study

    Directory of Open Access Journals (Sweden)

    Barbara Grube

    2015-01-01

    Full Text Available Background. Litramine (IQP-G-002AS was shown to be effective and safe for weight loss in overweight and obese subjects. However, long-term effectiveness on maintenance of body weight loss has yet to be ascertained. Objective. To assess effect of Litramine on maintenance of body weight loss. Methods. A double-blind, randomised, placebo-controlled trial on overweight and obese patients was conducted over two sites in Germany for 24 weeks. Subjects with documented previous weight loss of 3% over the last 3–6 months were randomised to groups given either Litramine (3 g/day or a matching placebo. Primary endpoints were difference of mean body weight (kg between baseline and end of study and maintenance of initially lost body weight in verum group, where maintenance is defined as ≤1% weight gain. Results. Subjects who were taking Litramine lost significantly more body weight compared to the subjects taking placebo who gained weight instead (-0.62±1.55 kg versus 1.62±1.48 kg, p<0.001. More importantly, 92% of subjects in Litramine group were able to maintain their body weight after initial weight loss, versus 25% in placebo group. No serious adverse events were reported throughout. Conclusion. Litramine is effective and safe for long-term body weight maintenance. Trial Registration. This trial is registered with Clinicaltrials.gov identifier: NCT01505387.

  13. 14 CFR 171.273 - Maintenance and operations requirements.

    Science.gov (United States)

    2010-01-01

    ... authorized persons. (3) FCC licensing requirements for operations and maintenance personnel. (4) Posting of..., with a maximum corrective maintenance time of not greater than 1.5 hours. This measure applies to... than 1,500 hours. This measure applies to unscheduled outages, out-of-tolerance conditions, and...

  14. Value centric approaches to the design, operations and maintenance of wind turbines

    Science.gov (United States)

    Khadabadi, Madhur Aravind

    Wind turbine maintenance is emerging as an unexpectedly high component of turbine operating cost, and there is an increasing interest in managing this cost. This thesis presents an alternative view of maintenance as a value-driver, and develops an optimization algorithm to evaluate the value delivered by different maintenance techniques. I view maintenance as an operation that moves the turbine to an improved state in which it can generate more power and, thus, earn more revenue. To implement this approach, I model the stochastic deterioration of the turbine in two dimensions: the deterioration rate, and the extent of deterioration, and then use maintenance to improve the state of the turbine. The value of the turbine is the difference between the revenue from to the power generation and the costs incurred in operation and maintenance. With a focus on blade deterioration, I evaluate the value delivered by implementing two different maintenance schemes, predictive maintenance and scheduled maintenance. An example of predictive maintenance technique is the use of Condition Monitoring Systems to precisely detect deterioration. I model Condition Monitoring System (CMS) of different degrees of fidelity, where a higher fidelity CMS would allow the blade state to be determined with a higher precision. The same model is then applied for the scheduled maintenance technique. The improved state information obtained from these techniques is then used to derive an optimal maintenance strategy. The difference between the value of the turbine with and without the inspection type can be interpreted as the value of the inspection. The results indicate that a higher fidelity (and more expensive) inspection method does not necessarily yield the highest value, and, that there is an optimal level of fidelity that results in maximum value. The results also aim to inform the operator of the impact of regional parameters such as wind speed, variance and maintenance costs to the optimal

  15. Manpower development for safe operation of nuclear power plant. China. Advice on maintenance planning. Activity: 3.1.2-Task-06. Technical report

    International Nuclear Information System (INIS)

    Chihara, Y.; Imai, K.

    1996-01-01

    Regarding the matter of quality assurance related to maintenance activities, we provided appropriate advice on the details of maintenance technologies and on quality control for the nuclear power plant. The advice was provided based on our experience in Japan, with explanations made from specialists' points of view in the form of a lecture. This also included an exchange of questions and answers regarding our experiences with quality control and maintenance activities in Japan

  16. An improved segmentation-based HMM learning method for Condition-based Maintenance

    International Nuclear Information System (INIS)

    Liu, T; Lemeire, J; Cartella, F; Meganck, S

    2012-01-01

    In the domain of condition-based maintenance (CBM), persistence of machine states is a valid assumption. Based on this assumption, we present an improved Hidden Markov Model (HMM) learning algorithm for the assessment of equipment states. By a good estimation of initial parameters, more accurate learning can be achieved than by regular HMM learning methods which start with randomly chosen initial parameters. It is also better in avoiding getting trapped in local maxima. The data is segmented with a change-point analysis method which uses a combination of cumulative sum charts (CUSUM) and bootstrapping techniques. The method determines a confidence level that a state change happens. After the data is segmented, in order to label and combine the segments corresponding to the same states, a clustering technique is used based on a low-pass filter or root mean square (RMS) values of the features. The segments with their labelled hidden state are taken as 'evidence' to estimate the parameters of an HMM. Then, the estimated parameters are served as initial parameters for the traditional Baum-Welch (BW) learning algorithms, which are used to improve the parameters and train the model. Experiments on simulated and real data demonstrate that both performance and convergence speed is improved.

  17. [The maintenance of automatic analysers and associated documentation].

    Science.gov (United States)

    Adjidé, V; Fournier, P; Vassault, A

    2010-12-01

    The maintenance of automatic analysers and associated documentation taking part in the requirements of the ISO 15189 Standard and the French regulation as well have to be defined in the laboratory policy. The management of the periodic maintenance and documentation shall be implemented and fulfilled. The organisation of corrective maintenance has to be managed to avoid interruption of the task of the laboratory. The different recommendations concern the identification of materials including automatic analysers, the environmental conditions to take into account, the documentation provided by the manufacturer and documents prepared by the laboratory including procedures for maintenance.

  18. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  19. Methods and tools in development in the field of maintenance; Methodes et outils pour la maintenance en cours de developpement

    Energy Technology Data Exchange (ETDEWEB)

    Le Reverend, D.; Tortolano, M. [Electricite de France (EDF/RD), 78 - Chatou (France); Leniaud, F. [Electricite de France (EDF), Div. Production Nuleaire, 93 - Saint-Denis (France)

    2004-07-01

    This article is dedicated to the maintenance strategy followed by EDF for its nuclear power plants. This strategy is based on the American method RCM (reliability centered method) that has been extended to passive components such as structures and relies on 4 axis. The first axis can be defined as the optimization of maintenance with regard to safety, outage and costs. The aim is to set the border between preventive maintenance and remedial maintenance. The second axis is the condition based maintenance that is the maintenance action that is triggered by the real state of the equipment. This type of maintenance implies the search for reliable and accurate diagnostics. The third axis is the design of simulation and planning tools required for the management of the moving of tools, machinery and spare-parts on a maintenance work site. The fourth axis is the design of tools able to repair some important equipment, this way may be a valid alternative to the replacement of equipment in terms of cost and outage time. (A.C.)

  20. Comparative study of heuristics algorithms in solving flexible job shop scheduling problem with condition based maintenance

    Directory of Open Access Journals (Sweden)

    Yahong Zheng

    2014-05-01

    Full Text Available Purpose: This paper focuses on a classic optimization problem in operations research, the flexible job shop scheduling problem (FJSP, to discuss the method to deal with uncertainty in a manufacturing system.Design/methodology/approach: In this paper, condition based maintenance (CBM, a kind of preventive maintenance, is suggested to reduce unavailability of machines. Different to the simultaneous scheduling algorithm (SSA used in the previous article (Neale & Cameron,1979, an inserting algorithm (IA is applied, in which firstly a pre-schedule is obtained through heuristic algorithm and then maintenance tasks are inserted into the pre-schedule scheme.Findings: It is encouraging that a new better solution for an instance in benchmark of FJSP is obtained in this research. Moreover, factually SSA used in literature for solving normal FJSPPM (FJSP with PM is not suitable for the dynamic FJSPPM. Through application in the benchmark of normal FJSPPM, it is found that although IA obtains inferior results compared to SSA used in literature, it performs much better in executing speed.Originality/value: Different to traditional scheduling of FJSP, uncertainty of machines is taken into account, which increases the complexity of the problem. An inserting algorithm (IA is proposed to solve the dynamic scheduling problem. It is stated that the quality of the final result depends much on the quality of the pre-schedule obtained during the procedure of solving a normal FJSP. In order to find the best solution of FJSP, a comparative study of three heuristics is carried out, the integrated GA, ACO and ABC. In the comparative study, we find that GA performs best in the three heuristic algorithms. Meanwhile, a new better solution for an instance in benchmark of FJSP is obtained in this research.

  1. Implementation of maintenance rule for structures

    International Nuclear Information System (INIS)

    Ashar, H.; Bagchi, G.

    1999-01-01

    The maintenance rule, 10 CFR 50.65, 'Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants', was published by the Nuclear Regulatory Commission (NRC) in the Federal Register (56 FR 31324) on July 10, 1991. The rule became effective on July 10, 1996, giving nuclear power plant licensees 5 years to implement it. During 1994-1995, NRC staff visited nine nuclear power plant sites to observe licensees' preparations for implementation of the rule. The teams found that most of the licensees had not established goals, or performance criteria for monitoring structures at their sites. The licensees contended that the structures were inherently reliable and required no monitoring under the maintenance rule. On the basis of earlier site visits performed by NRC staff to assess the condition of structures, the NRC staff could not accept this contention, and clarified its position in Revision 1 of Regulatory Guide 1.160, 'Monitoring the Effectiveness of Maintenance at Nuclear Power Plants'. This paper discusses the applicability of the maintenance rule criteria for structures and its usefulness in ensuring that the structures, systems, and components within the scope of the maintenance rule are capable of fulfilling their intended functions. Also discussed are the aspects of maintenance rule efforts that could be useful for license renewal applications. (orig.)

  2. Plant maintenance and advanced reactors, 2006

    Energy Technology Data Exchange (ETDEWEB)

    Agnihotri, Newal (ed.)

    2006-09-15

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Advanced plants to meet rising expectations, by John Cleveland, International Atomic Energy Agency, Vienna; A flexible and economic small reactor, by Mario D. Carelli and Bojan Petrovic, Westinghouse Electric Company; A simple and passively safe reactor, by Yury N. Kuznetsov, Research and Development Institute of Power Engineering (NIKIET), Russia; Gas-cooled reactors, by Jeffrey S. Merrifield, U.S. Nuclear Regulatory Commission; ISI project managment in the PRC, by Chen Chanbing, RINPO, China; and, Fort Calhoun refurbishment, by Sudesh Cambhir, Omaha Public Power District.

  3. Maintenance policy of the nuclear park

    International Nuclear Information System (INIS)

    Teisset, J.M.

    1995-01-01

    The nuclear installations maintenance policy of Electricite de France (EDF) follows three axes: first, controlling the aging of the production tool to warrant the safety and the functional reliability during the 40 years of installations service life. Second: optimizing the maintenance activities taking into account the safety goals, costs, security, dosimetry, duration of outages, and intervention conditions in the decisions. Third: developing a real partnership with contractors. EDF has decided to decentralize its maintenance operations towards each unit which is in charge of the organization of its own project. A better management of the contractor personnel has allowed to increase the performances of maintenance operations. The development of long-term agreements with contractors has permitted to reinforce the qualification, the responsibility and the efficiency of the personnel and to improve their means and tools. (J.S.). 1 photo

  4. South Blackwater Coal`s maintenance program

    Energy Technology Data Exchange (ETDEWEB)

    Nash, J. [South Blackwater Coal Limited, Blackwater, Qld. (Australia)

    1998-09-01

    The South Blackwater operation consists of two opencut mining areas and two underground mines (Laleham and Kenmure) near Blackwater in central Queensland, all of which supply coal to a central coal preparation plant. South Blackwater Coal Ltd. recently developed a maintenance improvement programme, described in this article. The programme involved implementation systems of key performance indicators (KPIs), benchmaking, condition monitoring, work planning and control, failure analysis and maintenance audit. Some improvements became almost immediately apparent, others were quite gradual. Major results included: improved availability (and reliability) of all opencast fleets, improvements in rear dump availability; reduced maintenance man-hours for opencast fleets; and increased availability of the coal handling and preparation plant. The paper is an edited version of that presented at the `Maintenance in mining conference` 16-19 March 1998, held in Bali, Indonesia. 4 figs., 2 photos.

  5. Measurement of Water Quality Parameters for Before and After Maintenance Service in Water Filter System

    Directory of Open Access Journals (Sweden)

    Shaharudin Nuraida

    2017-01-01

    Full Text Available An adequate supply of safe drinking water is one of major ways to obtain healthy life. Water filter system is one way to improve the water quality. However, to maintain the performance of the system, it need to undergo the maintenance service. This study evaluate the requirement of maintenance service in water filter system. Water quality was measured before and after maintenance service. Parameters measured were pH, turbidity, residual chlorine, nitrate and heavy metals and these parameters were compared with National Drinking Water Quality Standards. Collection of data were involved three housing areas in Johor. The quality of drinking water from water filter system were analysed using pH meter, turbidity meter, DR6000 and Inductively Coupled Plasma-Mass Spectrometer. pH value was increased from 16.4% for before maintenance services to 30.7% for after maintenance service. Increment of removal percentage for turbidity, residual chlorine and nitrate after maintenance were 21.5, 13.6 and 26.7, respectively. This result shows that maintenance service enhance the performance of the system. However, less significant of maintenance service for enhance the removal of heavy metals which the increment of removal percentage in range 0.3 to 9.8. Only aluminium shows percentage removal for after maintenance with 92.8% lower compared to before maintenance service with 95.5%.

  6. Maintenance management balancing performance maintenance and cost balance at reinforced concrete constructions of the fossil-fuel and nuclear power stations

    International Nuclear Information System (INIS)

    Ito, Hiroshi; Benno, Hiroshi; Ozaki, Mitsuhiro

    2003-01-01

    Life elongation of concrete constructions (CCs) is a very important needs for supporting future safe supply of electric power. However, some CCs constructed and used for a long term at fossil-fuel and nuclear power stations had reduction of their required performance by deterioration based on environmental and using conditions represented by salt-damage. As such constructions are anxious to increase in future, it is necessary to keep reliability of their establishments by providing desired rehabilitation to persist supplying effect of their facilities. On the other hand, as it is also essential to progress keeping and reducing cost of power generation together with development of recent liberalization of electric power, it is an important subject how to keep their performance maintenance and cost balance. Therefore, here were outlined on required performance setting method, inspection method, long-term deterioration forecasting and evaluating methods, selection method of countermeasure scenarios minimizing LCC, inspection period setting method, introduction of database and deterioration forecasting system, and so on, to economically maintain and manage already built reinforced concrete constructions at suitable materials and places to elongate their lives. (G.K.)

  7. Regulatory control of maintenance activities in Argentine nuclear power plants

    International Nuclear Information System (INIS)

    Calvo, J.C.; Caruso, G.

    2000-01-01

    The main maintenance objective is to assure that the safety features of structures, components and systems of nuclear power plants are kept as designed. Therefore, there is a direct relationship between safety and maintenance. Owing to the above mentioned, maintenance activities are considered a relevant regulatory issue for the Argentine Nuclear Regulatory Authority (ARN). This paper describes the regulatory control to maintenance activities of Argentine nuclear power plants. It also addresses essential elements for maintenance control, routine inspections, special inspections during planned outages, audits and license conditions and requirements. (author)

  8. Environmental Management Model for Road Maintenance Operation Involving Community Participation

    Science.gov (United States)

    Triyono, A. R. H.; Setyawan, A.; Sobriyah; Setiono, P.

    2017-07-01

    Public expectations of Central Java, which is very high on demand fulfillment, especially road infrastructure as outlined in the number of complaints and community expectations tweeter, Short Mail Massage (SMS), e-mail and public reports from various media, Highways Department of Central Java province requires development model of environmental management in the implementation of a routine way by involving the community in order to fulfill the conditions of a representative, may serve road users safely and comfortably. This study used survey method with SEM analysis and SWOT with Latent Independent Variable (X), namely; Public Participation in the regulation, development, construction and supervision of road (PSM); Public behavior in the utilization of the road (PMJ) Provincial Road Service (PJP); Safety in the Provincial Road (KJP); Integrated Management System (SMT) and latent dependent variable (Y) routine maintenance of the provincial road that is integrated with the environmental management system and involve the participation of the community (MML). The result showed the implementation of routine maintenance of road conditions in Central Java province has yet to implement an environmental management by involving the community; Therefore developed environmental management model with the results of H1: Community Participation (PSM) has positive influence on the Model of Environmental Management (MML); H2: Behavior Society in Jalan Utilization (PMJ) positive effect on Model Environmental Management (MML); H3: Provincial Road Service (PJP) positive effect on Model Environmental Management (MML); H4: Safety in the Provincial Road (KJP) positive effect on Model Environmental Management (MML); H5: Integrated Management System (SMT) has positive influence on the Model of Environmental Management (MML). From the analysis obtained formulation model describing the relationship / influence of the independent variables PSM, PMJ, PJP, KJP, and SMT on the dependent variable

  9. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  10. Principles of MONJU maintenance. Characteristic of MONJU maintenance and reflection of LWR maintenance experience to FBR

    International Nuclear Information System (INIS)

    Nakai, Satoru; Nishio, Ryuichi; Uchihashi, Masaya; Kaneko, Yoshihisa; Yamashita, Hironobu; Yamaguchi, Atsunori; Aoki, Takayuki

    2014-01-01

    A sodium cooled fast breeder reactor (FBR) has unique systems and components and different degradation mechanism from light water reactor (LWR) so that need to establish maintenance technology in accordance with its features. The examination of the FBR maintenance technology is carried out in the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM). As a result of the study such as extraction of Monju maintenance feature, maintenance technology benchmark between Monju and LWR components and survey of LWR maintenance experience, it is clear that principles of maintenance are same as LWR, necessity of LWR maintenance experience reflection and points to be considered in Monju maintenance. The road map to establish a FBR maintenance technology in the technical aspect became clear and it is vital to acquire operation and maintenance experience of the plant to implement this road map, and to establish a fast reactor maintenance. (author)

  11. City gates maintenance - TBG experience; Experiencia da TBG na manutencao de estacoes de entrega de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Rocha, Adir de Brito; Tavares, Cipriano Homem; Pinto, Jose Eduardo Christovao [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Owner and sole operator in Brasilian territory of the Bolivia-Brazil Gas Pipeline (GASBOL), the largest of its kind in South America, TBG started operations on July 1 st, 1999. Since then, it has ensured transportation of Bolivian natural gas into Brazil swiftly and safely. This paper relates the TBG experiences on Natural Gas City Gates maintenance and its components like filtering, heating, pressure reducing redundant valves, turbine meters, flow computers, solar panel power supply, satellite monitoring system, acquired by 6 years of operation of Brazil Bolivia Gas Pipe Line. It describes the definitions of maintenance plans using RCM - Reliability-centered Maintenance concepts and the most important learning experiences. (author)

  12. Imperfect Preventive Maintenance Model Study Based On Reliability Limitation

    Directory of Open Access Journals (Sweden)

    Zhou Qian

    2016-01-01

    Full Text Available Effective maintenance is crucial for equipment performance in industry. Imperfect maintenance conform to actual failure process. Taking the dynamic preventive maintenance cost into account, the preventive maintenance model was constructed by using age reduction factor. The model regards the minimization of repair cost rate as final target. It use allowed smallest reliability as the replacement condition. Equipment life was assumed to follow two parameters Weibull distribution since it was one of the most commonly adopted distributions to fit cumulative failure problems. Eventually the example verifies the rationality and benefits of the model.

  13. ON THE NECESSITY OF CHANGES IN THE STRATEGY OF UTILIZATION SHIP BOILER TECHNICAL CONDITION MAINTENANCE IN THE ASPECT OF LNG APPLIED AS FUEL

    Directory of Open Access Journals (Sweden)

    Andrzej ADAMKIEWICZ

    2017-01-01

    Full Text Available Heavy oils (HFO fuels used on ships play a part in degradation of technical condition of heat exchange surfaces of utiliza-tion boilers especially on the exhaust gas side. Presence of sulphur in these fuels is the main factor favouring degrada-tion. The upper limit for sulphur content in the fuel used outside the SECA areas equal to 3.5% is currently in force, at least until the year 2020 or 2025. The recommended by classification societies overhauls of utilization boilers are, there-fore characterized by a specially chosen strategy thanks to which it is possible to maintain their appropriate technical condition. The requirement to use fuels with low sulphur content (LSFO, which are significantly more expensive than MDO fuels, in the areas of controlled sulphur emissions also led to a further introduction of alternative fuels, such as methanol and above all liquefied natural gas (LNG, onto ships. That is especially valid for the ship owners whose vessels e.g. ferries sail mainly within SCECA This article analyses the consequences of the introduced fuel change on utilization boiler maintenance. A change in the technical condition maintenance strategy for utilization boilers has been suggested.

  14. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  15. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    International Nuclear Information System (INIS)

    Dobson, D.; Churby, A.; Krieger, E.; Maloy, D.; White, K.

    2011-01-01

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance and Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  16. Agricultural Technical Maintenance in the Republic of Belarus

    Directory of Open Access Journals (Sweden)

    V. V. Pavlova

    2004-01-01

    Full Text Available In the process of market reforms introduction of maintenance system as a body of interrelated means, normative documents and executor of services and works with the purpose to ensure efficient designated machinery application and its serviceable condition within the whole service life period takes rather important significance. In order to provide commodity producers with the required types of service it is necessary to create competitive market of service executors. It is recognized that the dealer′s system is the most efficient one out of a great variety of existing and new structures, forms and methods of technical maintenance organization. The system of technical maintenance in the agroindustrial complex of Belarus should ensure profitable conditions of the production activity to all its participants: machinery manufacturers, their users and commercial agents.

  17. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  18. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  19. Integrated Instrumentation and Sensor Systems Enabling Condition-Based Maintenance of Aerospace Equipment

    Directory of Open Access Journals (Sweden)

    Richard C. Millar

    2012-01-01

    Full Text Available The objective of the work reported herein was to use a systems engineering approach to guide development of integrated instrumentation/sensor systems (IISS incorporating communications, interconnections, and signal acquisition. These require enhanced suitability and effectiveness for diagnostics and health management of aerospace equipment governed by the principles of Condition-based maintenance (CBM. It is concluded that the systems engineering approach to IISS definition provided clear benefits in identifying overall system requirements and an architectural framework for categorizing and evaluating alternative architectures, relative to a bottom up focus on sensor technology blind to system level user needs. CBM IISS imperatives identified include factors such as tolerance of the bulk of aerospace equipment operational environments, low intrusiveness, rapid reconfiguration, and affordable life cycle costs. The functional features identified include interrogation of the variety of sensor types and interfaces common in aerospace equipment applications over multiplexed communication media with flexibility to allow rapid system reconfiguration to adapt to evolving sensor needs. This implies standardized interfaces at the sensor location (preferably to open standards, reduced wire/connector pin count in harnesses (or their elimination through use of wireless communications.

  20. Development of advanced human-machine system for plant operation and maintenance

    International Nuclear Information System (INIS)

    Wu, Wei; Ohi, Tadashi; Yoshikawa, Hidekazu; Sawaragi, Tetsuo; Kitamura, Masaharu; Furuta, Kazuo; Gofuku, Akio; Ito, Koji

    2004-01-01

    With the worldwide deregulation of the power industry, and the aging of the nuclear power plants (NPPs), concerns are growing over the reliability and safety of the NPPs, because the regulation of man power may lower the current high level of reliability and safety. In this paper, a concept of overall integrated plant management mechanism is proposed, in order to meet the requirements of cutting costs of NPPs and the requirements of maintaining or increasing safety and reliability. The concept is called as satellite operation maintenance center (SOMC). SOMC integrates the operation and maintenance activities of several NPP units by utilizing advanced information technologies to support cooperation activities between workers allocated at SOMC and the field workers. As for the operation activities, a framework called as Advanced Operation System (AOS) is proposed in this paper. AOS consists of three support sub-systems: dynamic operation permission system(DyOPS), supervisor information presentation system using interface agent, and crew performance evaluation system. As for the maintenance activities, a framework called as Ubiquitous-Computing-based Maintenance support System (UCMS) is proposed next. Two case studies are described, in order to show the way of how UCMS support field workers to do maintenance tasks efficiently, safely, and infallibly as well. Finally, a prospect of SOMC is shown in order to explain the way of how the technology elements developed in this project could be integrated as a whole one system to support maintenance activities of NPPs in the future. (author)

  1. Is nuclear power safe enough

    Energy Technology Data Exchange (ETDEWEB)

    Andresen, A F [Institutt for Atomenergi, Kjeller (Norway)

    1979-01-01

    The lecture formed a commentary on the report of the Norwegian Government's Commission on Nuclear power Safety which was published in October 1978. It was introductorily pointed out that 'safe' and 'safety' are not in themselves meaningful terms and that the probability of an occurrence is the real measure. The main items in the Commission's report have been core meltdown, releases during reprocessing, waste disposal, plutonium diversion and environmental impacts. The 21 members of the Commission were unanimous in 7 of the 8 chapters. In chapter 2, 'Summary and Conclusions', 3 members dissented from the majority opinion, that, subject to certain conditions, nuclear power was a safe and acceptable source of energy.

  2. In-vessel remote maintenance of the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Tabor, M.A.; Hager, E.R.; Creedon, R.L.; Fisher, M.V.; Atkin, S.D.

    1987-01-01

    The Compact Ignition Tokamak (CIT) is the first deuterium-tritium (D-T) fusion device that will study the physics of an ignited plasma. The ability of the tokamak vacuum vessel to be maintained remotely while under vacuum has not been fully demonstrated on previous machines, and this ability will be critical to the efficient and safe operation of ignition devices. Although manned entry into the CIT vacuum vessel will be possible during the nonactivated stages of operation, remotely automated equipment will be used to assist in initial assembly of the vessel as well as to maintain all in-vessel components once the D-T burn is achieved. Remote maintenance and operation will be routinely required for replacement of thermal protection tiles, inspection of components, leak detection, and repair welding activities. Conceptual design to support these remote maintenance activities has been integrated with the conceptual design of the in-vessel components to provide a complete and practical remote maintenance system for CIT. The primary remote assembly and maintenance operations on CIT will be accomplished through two dedicated 37- x 100-cm ports on the main toroidal vessel. Each port contains a single articulated boom manipulator (ABM), which is capable of accessing half of the torus. The proposed ABM consists of a movable carriage assembly, telescoping two-part mast, and articulated link sections. 1 ref

  3. Safe electrical design of mine elevator control systems

    Energy Technology Data Exchange (ETDEWEB)

    Barkand, T.D. [Mine Safety and Health Administration, Pittsburgh, PA (United States)

    1995-12-31

    A mine elevator recently experienced an ascending car overspeed accident resulting in serious injuries to four passengers. Although the four miners laid down on the floor prior to impact, the miners struck the ceiling of the elevator car as it collided into the overhead structure at an estimated speed four times faster than normal. Several electrical design precautions can be implemented to prevent elevator control system failures. This paper examines safe electrical design of elevator control systems. Supplemental circuits and devices which improve the safety integrity and maintenance of the elevator control system are presented. These circuits and devices provide protection that eliminates the potential hazard and significantly reduces the possibility of a mine elevator accident.

  4. Safe electrical design of mine elevator control systems

    Energy Technology Data Exchange (ETDEWEB)

    Barkand, T.D. [Mine Safety and Health Administration, Pittsburgh, PA (United States)

    1997-03-01

    A mine elevator recently experienced an ascending-car overspeed accident, resulting in serious injuries to four passengers. Although the four miners laid down on the floor prior to impact, the miners struck the ceiling of the elevator car as it collided into the overhead structure at an estimated speed four times faster than normal. Several electrical design precautions can be implemented to prevent elevator control system failures. This paper examines safe electrical design of elevator control systems. Supplemental circuits and devices which improve the safety integrity and maintenance of the elevator control system are presented. These circuits and devices provide protection that eliminates the potential hazard and significantly reduces the possibility of a mine elevator accident.

  5. Construction, Maintenance and Demolition of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Smet, Camiel de [Hilti Corporation, P.O. Box 333, FL-9494 Schaan (Liechtenstein)

    2008-07-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  6. Construction, Maintenance and Demolition of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Smet, Camiel de

    2008-01-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  7. Quality upgrading and cost reducing effects of using an operation control system for performance of maintenance tasks

    International Nuclear Information System (INIS)

    Ramler, K.

    1996-01-01

    According to available results, the use of an operation control system has come up to expections with respect to a quality enhancement of maintenance work. The tasks are performed more safely and there is more insight into the processes. so that, as indirect results, cost savings and rationalisation effects are to be expected. However, the cost savings achieved through the operation control system for maintenance tasks will remain modest. The truly cost-effective optimisation potentials in the maintenance area primarily consist in a reduction of preventive measures to the required scope, i.e reduction of the envisaged quantity of processes for maintenance and recurrent inspection. In order to extend savings to the organisational level, with respect to personnel expenditure, by DP supported maintenance planning, a suitable optimisation of the organisational structure and personnel employment is inevitable, because otherwise the rationalisation potentials will remain utopia. (orig.) [de

  8. Functional Problems and Maintenance Operations of Hydraulic Turbines

    Directory of Open Access Journals (Sweden)

    Liliana Topliceanu

    2016-02-01

    Full Text Available The exploitation in good conditions of the hydroelectric power plant imposes a rigorous maintenance of equipment and operating facilities, primarily of the turbine. The efficiency of the turbine is strongly affected by any defects which could occur during the operation. The paper makes a synthesis of the most frequent failures which have occurred during the functioning of Kaplan turbines plant and the required maintenance plan that has to be adopted. The maintenance rules for the optimal working of these turbines are also emphasized.

  9. The Maintenance of Heating, Ventilating and Air-Conditioning Systems and Indoor Air Quality in Schools: A Guide for School Facility Managers. Technical Bulletin.

    Science.gov (United States)

    Wheeler, Arthur E.

    To help maintain good indoor air quality (IAQ) in schools, guidance for the development and implementation of an effective program for maintenance and operation of heating, ventilating, and air-conditioning (HVAC) systems are discussed. Frequently, a building's occupants will complain about IAQ when the temperature or humidity are at uncomfortable…

  10. Hotspot and sampling analysis for effective maintenance and performance monitoring.

    Science.gov (United States)

    2017-05-01

    In this project, we propose two sampling methods addressing how much and where the agencies need to collect infrastraucture condition data for accurate Level-of-Maintenance (LOM) estimation in maintenance network with single type or multiple ty...

  11. Maintenance metabolism and carbon fluxes in Bacillus species

    Directory of Open Access Journals (Sweden)

    Decasper Seraina

    2008-06-01

    Full Text Available Abstract Background Selection of an appropriate host organism is crucial for the economic success of biotechnological processes. A generally important selection criterion is a low maintenance energy metabolism to reduce non-productive consumption of substrate. We here investigated, whether various bacilli that are closely related to Bacillus subtilis are potential riboflavin production hosts with low maintenance metabolism. Results While B. subtilis exhibited indeed the highest maintenance energy coefficient, B. licheniformis and B. amyloliquefaciens exhibited only statistically insignificantly reduced maintenance metabolism. Both B. pumilus and B. subtilis (natto exhibited irregular growth patterns under glucose limitation such that the maintenance metabolism could not be determined. The sole exception with significantly reduced maintenance energy requirements was the B. licheniformis strain T380B. The frequently used spo0A mutation significantly increased the maintenance metabolism of B. subtilis. At the level of 13C-detected intracellular fluxes, all investigated bacilli exhibited a significant flux through the pentose phosphate pathway, a prerequisite for efficient riboflavin production. Different from all other species, B. subtilis featured high respiratory tricarboxylic acid cycle fluxes in batch and chemostat cultures. In particular under glucose-limited conditions, this led to significant excess formation of NADPH of B. subtilis, while anabolic consumption was rather balanced with catabolic NADPH formation in the other bacilli. Conclusion Despite its successful commercial production of riboflavin, B. subtilis does not seem to be the optimal cell factory from a bioenergetic point of view. The best choice of the investigated strains is the sporulation-deficient B. licheniformis T380B strain. Beside a low maintenance energy coefficient, this strain grows robustly under different conditions and exhibits only moderate acetate overflow, hence

  12. Project management plan for Reactor 105-C Interim Safe Storage project

    International Nuclear Information System (INIS)

    Plagge, H.A.

    1996-09-01

    Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules

  13. Establishing a predictive maintenance (PdM) program at the Hanford Site

    International Nuclear Information System (INIS)

    Murray, W.A.; Winslow, R.G.

    1994-02-01

    The production reactors have been shut down for some time. But for the rest of the site, there is currently about 16,000 people engaged in a multi-billion dollar effort to safely process wastes which have been stored at the site since the 1940's. This effort also includes demolition of some older facilities and environmental restoration of much of the site. This is expected to take approximately 30 to 40 years. The concept of a site-wide predictive maintenance (PdM) program began to form in early 1993. Several informal studies showed that the stand alone predictive maintenance groups which had prevailed on site to date were less than 15% effective at trending equipment conditions and predicting failures. To improve the effectiveness of PdM within the company, an engineering analysis by Rick Winslow confirmed that utilization of software networking technology which was now available would significantly overcome many of these built in handicaps. A site-wide predictive maintenance network would make PdM technology accessible to all of the areas and facilities at the site regardless of geographical distances and company division lines. Site resident vibration experts can easily be located and provide consultations on the network. However, it was recognized that strong leadership and management skills would be required within each of the two organizations for effective implementation. To start this process, a letter of understanding and agreement between the facilities and Tank Farm divisions was drafted and endorsed by company management. The agreement assigned the primary responsibility of acquiring the network software and licensee to the Tank Farms division. The acquisition and installation of the network server would be the responsibility of the facilities division. This paper describes the rest of the network development and implementation process

  14. Maintenance Decision Based on Data Fusion of Aero Engines

    Directory of Open Access Journals (Sweden)

    Huawei Wang

    2013-01-01

    Full Text Available Maintenance has gained a great importance as a support function for ensuring aero engine reliability and availability. Cost-effectiveness and risk control are two basic criteria for accurate maintenance. Given that aero engines have much condition monitoring data, this paper presents a new condition-based maintenance decision system that employs data fusion for improving accuracy of reliability evaluation. Bayesian linear model has been applied, so that the performance degradation evaluation of aero engines could be realized. A reliability evaluation model has been presented based on gamma process, which achieves the accurate evaluation by information fusion. In reliability evaluation model, the shape parameter is estimated by the performance degradation evaluation result, and the scale parameter is estimated by failure, inspection, and repair information. What is more, with such reliability evaluation as input variables and by using particle swarm optimization (PSO, a stochastic optimization of maintenance decision for aircraft engines has been presented, in which the effectiveness and the accuracy are demonstrated by a numerical example.

  15. Maintenance of nuclear medicine instruments

    Energy Technology Data Exchange (ETDEWEB)

    Ambro, P

    1993-12-31

    Maintenance of instruments is generally of two kinds: (a) corrective maintenance, on a non-scheduled basis, to restore equipment to a functional status by repairs; (b) preventive maintenance, to keep equipment in a specified functional condition by providing systematic inspection, quality control, detection and correction of early malfunctions. Most of the instruments used in nuclear medicine are rather complex systems built from mechanical, electrical and electronic parts. Any one of these components is liable to fail at some time or other. Repair could be done only by a specialist who is able to evaluate the condition of the various parts ranging from cables to connectors, from scintillators to photomultipliers, from microprocessors to microswitches. The knowledge of the intricacies of the various electronic components required for their repairs is quite wide and varied. The electronics industry turns out more and more multi-purpose chips which can carry out the functions of many parts used in the instruments of the earlier generation. This provides protection against unauthorized copying of the circuits but it serves another purpose as well of inhibiting repairs by non-factory personnel. These trends of the instrument design should be taken into consideration when a policy has to be developed for the repairs of the hospital based equipment 1 fig., 1 tab

  16. Maintenance of nuclear medicine instruments

    International Nuclear Information System (INIS)

    Ambro, P.

    1992-01-01

    Maintenance of instruments is generally of two kinds: (a) corrective maintenance, on a non-scheduled basis, to restore equipment to a functional status by repairs; (b) preventive maintenance, to keep equipment in a specified functional condition by providing systematic inspection, quality control, detection and correction of early malfunctions. Most of the instruments used in nuclear medicine are rather complex systems built from mechanical, electrical and electronic parts. Any one of these components is liable to fail at some time or other. Repair could be done only by a specialist who is able to evaluate the condition of the various parts ranging from cables to connectors, from scintillators to photomultipliers, from microprocessors to microswitches. The knowledge of the intricacies of the various electronic components required for their repairs is quite wide and varied. The electronics industry turns out more and more multi-purpose chips which can carry out the functions of many parts used in the instruments of the earlier generation. This provides protection against unauthorized copying of the circuits but it serves another purpose as well of inhibiting repairs by non-factory personnel. These trends of the instrument design should be taken into consideration when a policy has to be developed for the repairs of the hospital based equipment

  17. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  18. Optimal policies for cumulative damage models with maintenance last and first

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Qian, Cunhua; Nakagawa, Toshio

    2013-01-01

    From the economical viewpoint of several combined PM policies in reliability theory, this paper takes up a standard cumulative damage model in which the notion of maintenance last is applied, i.e., the unit undergoes preventive maintenances before failure at a planned time T, at a damage level Z, or at a shock number N, whichever occurs last. Expected cost rates are detailedly formulated, and optimal problems of two alternative policies which combine time-based with condition-based preventive maintenances are discussed, i.e., optimal T L ⁎ for N, Z L ⁎ for T, and N L ⁎ for T are rigorously obtained. Comparison methods between such maintenance last and conventional maintenance first are explored. It is determined theoretically and numerically which policy should be adopted, according to the different methods in different cases when the time-based or the condition-based PM policy is optimized.

  19. Risk based maintenance: Resource requirements and organizational challenges

    International Nuclear Information System (INIS)

    Weerakkody, S.D.

    2000-01-01

    10CFR50.65 'Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants' required licensees to monitor the performance or condition of structures, systems, or components (SSCs) against licensee established goals, in a manner sufficient to provide reasonable assurance that such SSCs are capable of fulfilling their intended functions. The goals were required to be commensurate with safety significance and operating experience. Northeast Utilities relied upon PRAs to implement 10CFR50.65, which is also referred to as the 'Maintenance Rule'. The Maintenance Rule changed some aspects of maintenance of structures, systems, and components (SSC) at nuclear power plants. One objective of the rule was to focus the maintenance resources based on risk significance of components. This paper will discuss the organizational challenges and resource requirements associated with implementation of the Maintenance Rule at nuclear facilities that are supported by the Northeast Utilities Services Company (NUSCo). The paper will discuss (a) how these challenges were addressed, (b) the resources required for ongoing efforts to support the Maintenance Rule, and (c) several key safety benefits derived from the implementation of the Maintenance Rule. (author)

  20. Evaluation of environmental and economic effectiveness of the Cross Compliance 4.3 Standards "Maintenance of olive groves and vineyards in good vegetative conditions"

    Directory of Open Access Journals (Sweden)

    Luigi Sansone

    2015-11-01

    Full Text Available This paper reports the first observations made in three farms of the Council for Agricultural Research and Economics (CREA relating to the environmental monitoring of the standard 4.3 maintenance of olive groves and vineyards in good vegetative conditions and analysis of differential of competitiveness  for both crops.

  1. Longitudinal Relationship between Plasma Reactive Oxygen Metabolites and Periodontal Condition in the Maintenance Phase of Periodontal Treatment

    Directory of Open Access Journals (Sweden)

    Tatsuya Machida

    2014-01-01

    Full Text Available Aim. The present cohort study describes the longitudinal relationship between plasma oxidative status and periodontitis progression during the maintenance phase of treatment. Materials and Methods. Forty-five patients (mean age 58.8 years were monitored from 2008 to 2013. Periodontal conditions, including probing pocket depth (PPD and clinical attachment level (CAL, were recorded. Measurements of plasma reactive oxygen metabolites (ROM and biologic antioxidant potential (BAP were performed to evaluate plasma oxidative status. The patients were assigned into 2 groups as low and high plasma ROM level using a cut-off value which was median of plasma ROM level at baseline. Results. In the subjects with low plasma ROM level at baseline, changes in mean CAL were positively correlated with changes in plasma ROM levels, bleeding on probing, and plaque control record, but not with PPD. In the subjects with high plasma ROM at baseline, changes in CAL were significantly associated with only PPD at baseline. On the other hands there were no significant associations between changes in CAL and those in plasma BAP levels. Conclusions. When plasma ROM level in periodontitis patients was low, increases in plasma ROM level were associated with those in CAL during the maintenance phase of treatment.

  2. Low-complexity Behavioral Model for Predictive Maintenance of Railway Turnouts

    DEFF Research Database (Denmark)

    Barkhordari, Pegah; Galeazzi, Roberto; Tejada, Alejandro de Miguel

    2017-01-01

    Maintenance of railway infrastructures represents a major cost driver for any infrastructure manager since reliability and dependability must be guaranteed at all times. Implementation of predictive maintenance policies relies on the availability of condition monitoring systems able to assess...

  3. Water hydraulic manipulator for fail safe and fault tolerant remote handling operations at ITER

    International Nuclear Information System (INIS)

    Nieminen, Peetu; Esque, Salvador; Muhammad, Ali; Mattila, Jouni; Vaeyrynen, Jukka; Siuko, Mikko; Vilenius, Matti

    2009-01-01

    Department of Intelligent Hydraulics and Automation (IHA) of Tampere University of Technology has been involved in the European Fusion program since 1994 within the ITER reactor maintenance activities. In this paper we discuss the design and development of a six degrees of freedom water hydraulic manipulator with a force feedback for teleoperation tasks. The manipulator is planned to be delivered to Divertor Test Platform 2 (DTP2) during year 2008. The paper also discusses the possibility to improve the fail safe and redundant operation of the manipulator. During the design of the water hydraulic manipulator, special provisions have been made in order to meet the safety requirements such as servo valve block for redundant operation and safety vane brakes for fail safe operation.

  4. 76 FR 12719 - Safe Schools/Healthy Students Program; Office of Safe and Drug-Free Schools; Safe Schools/Healthy...

    Science.gov (United States)

    2011-03-08

    ... DEPARTMENT OF EDUCATION Safe Schools/Healthy Students Program; Office of Safe and Drug- Free Schools; Safe Schools/Healthy Students Program; Catalog of Federal Domestic Assistance (CFDA) Numbers: 84... priorities, requirements, and definitions under the Safe Schools/Healthy Students (SS/HS) program. Since...

  5. A study on human performance enhancement plan in maintenance field by survey on actual condition of human performance tools - 15035

    International Nuclear Information System (INIS)

    Park, J.; Jeong, H.; Kim, Y.

    2015-01-01

    Human errors in nuclear power plant are one of the important factors that may cause reactor trip. Most operating companies of nuclear power plants manage human factor systematically through tools like HPES (Human Performance Enhancement), PSR (Periodic Safety Review), OE (Operating Experience), human performance tools, safety culture assessment and CAP (Corrective Action Program). But human factors are managed passively in maintenance field, because maintenance works are carrying out by partner companies. KHNP also contracts the maintenance work to the partner companies, and advise them to use human performance tools. But the actual condition on partner companies has not been surveyed. This paper suggests some plans that can improve human performance by analyzing the opinion of partner company employees about the causes and solutions of human errors, by analyzing utilization of human performance tools and by comparing the results of the partner companies survey with the results of the operating company survey. The survey is conducted to 3 partner companies by similar contents and categories in order to compare partner company with operating company, and the main analysis fields are the following: -1) Level of understanding and utilization of the human performance tools, -2) Difficulties of applying the human performance tools, -3) Level of employee's training (or education) in the use of the human performance tools, and -4) Root causes of human errors and countermeasures. (authors)

  6. Design of underground layout and their maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Bok Youn; Kang, Chang Hee; Jo, Young Do; Lim, Sang Taek [Korea Institute of Geology Mining and Materials, Taejon (Korea, Republic of)

    1997-12-01

    Layout of underground structure has to be designed based on rock mechanical analysis and the concept of active support has to be adopted considering the large openings are requested to accommodate heavy duty diesel equipment in underground. Rock bolt and shotcrete will be the most applicable method to support such a large dimensional tunnels. 1) Direction: The main haulage way of the mines where diesel equipment are operating is ramp way system. For optimizing safety measures, and minimizing maintenance cost of the tunnels, it is strongly recommended that all the tunnels including ramp way, rooms and sublevels should be designed in parallel to the direction of principal stress and perpendicular to the direction of major discontinuity. 2) Inclination: Basically, the inclination of the ramp way depends on the specification of the equipment, but 10-15% is usual. The steep inclination needs less initial investment but there will be an adverse effects such as higher operating and maintenance costs. 3) Profile (Cross section): The maximum dimension of the equipment operating in local mines appeared 12.8m long, 3.705m wide and 3.68m high. Considering the dimension, the requested profile simply can be calculated to 4m x 4m, but it should be decided according to the regulated minimum clearances from the walls and roof. The minimum inner curvature radius of the tunnels should be more than 5.2m, and in this case, the tunnel width of the curved zone should be more than 5.5m. 4) Sight distance and braking distance: For the safe operation of the equipment, the sight distance must be longer than braking distance, so that the driver can hold up the equipment safely after finding the obstacles in front of him. The maximum braking distance without heating of brake shoe is 60m. 5) Support and maintenance: Due to the large dimensional tunnels where diesel equipment are operating, the conventional supporting system is not applicable. Therefore, the active support concept should be

  7. Safeguards Automated Facility Evaluation (SAFE) methodology

    International Nuclear Information System (INIS)

    Chapman, L.D.; Grady, L.M.; Bennett, H.A.; Sasser, D.W.; Engi, D.

    1978-08-01

    An automated approach to facility safeguards effectiveness evaluation has been developed. This automated process, called Safeguards Automated Facility Evaluation (SAFE), consists of a collection of a continuous stream of operational modules for facility characterization, the selection of critical paths, and the evaluation of safeguards effectiveness along these paths. The technique has been implemented on an interactive computer time-sharing system and makes use of computer graphics for the processing and presentation of information. Using this technique, a comprehensive evaluation of a safeguards system can be provided by systematically varying the parameters that characterize the physical protection components of a facility to reflect the perceived adversary attributes and strategy, environmental conditions, and site operational conditions. The SAFE procedure has broad applications in the nuclear facility safeguards field as well as in the security field in general. Any fixed facility containing valuable materials or components to be protected from theft or sabotage could be analyzed using this same automated evaluation technique

  8. Maintenance of peripheral venous access and its impact on the development of phlebitis: a survey of 186 catheters in a general surgery department in Portugal.

    Science.gov (United States)

    do Rego Furtado, Luís Carlos

    2011-01-01

    This article reports the results of a clinical audit conducted to assess the minimum requirements for safe maintenance of peripheral intravenous catheters. The audit also determined the incidence of phlebitis and attempted to establish a causal relationship between some of the variables used to assess a catheter's maintenance status and the development of phlebitis.

  9. Nutritional status of maintenance dialysis patients

    DEFF Research Database (Denmark)

    Koefoed, Mette Juul; Kromann, Charles Boy; Juliussen, Sophie Ryberg

    2016-01-01

    Background and Aims Maintenance dialysis patients are at increased risk of abnormal nutritional status due to numerous causative factors, both nutritional and non-nutritional. The present study assessed the current prevalence of protein-energy wasting, low lean bodymass index and obesity...... protein catabolic rate in order to assess the prevalence of protein-energy wasting, low lean body mass index and obesity in these patients. Results Seventy-nine eligible maintenance dialysis patients participated. The prevalence of proteinenergy wasted patients was 4%(95%CI: 2-12) as assessed......-energy wasting and obesity varied considerably, depending on nutritional assessment methodology. Conclusions Our data indicate that protein-energy wasting is uncommon, whereas low lean body mass index and obesity are frequent conditions among patients in maintenance dialysis. A focus on how to increase...

  10. Florida maintenance rating program (MRP) assessment and enhancement : final report, May 28, 2008 [summary].

    Science.gov (United States)

    2008-01-01

    The Florida Department of Transportation : (FDOT) has used its maintenance rating : program (MRP) to evaluate the states : highway maintenance conditions and : determine asset maintenance needs since : 1985. Periodic evaluation of the program is :...

  11. A Fuzzy analytical hierarchy process approach in irrigation networks maintenance

    Science.gov (United States)

    Riza Permana, Angga; Rintis Hadiani, Rr.; Syafi'i

    2017-11-01

    Ponorogo Regency has 440 Irrigation Area with a total area of 17,950 Ha. Due to the limited budget and lack of maintenance cause decreased function on the irrigation. The aim of this study is to make an appropriate system to determine the indices weighted of the rank prioritization criteria for irrigation network maintenance using a fuzzy-based methodology. The criteria that are used such as the physical condition of irrigation networks, area of service, estimated maintenance cost, and efficiency of irrigation water distribution. 26 experts in the field of water resources in the Dinas Pekerjaan Umum were asked to fill out the questionnaire, and the result will be used as a benchmark to determine the rank of irrigation network maintenance priority. The results demonstrate that the physical condition of irrigation networks criterion (W1) = 0,279 has the greatest impact on the assessment process. The area of service (W2) = 0,270, efficiency of irrigation water distribution (W4) = 0,249, and estimated maintenance cost (W3) = 0,202 criteria rank next in effectiveness, respectively. The proposed methodology deals with uncertainty and vague data using triangular fuzzy numbers, and, moreover, it provides a comprehensive decision-making technique to assess maintenance priority on irrigation network.

  12. Cool and Safe: Multiplicity in Safe Innovation at Unilever

    Science.gov (United States)

    Penders, Bart

    2011-01-01

    This article presents the making of a safe innovation: the application of ice structuring protein (ISP) in edible ices. It argues that safety is not the absence of risk but is an active accomplishment; innovations are not "made safe afterward" but "safe innovations are made". Furthermore, there are multiple safeties to be accomplished in the…

  13. Significance of Building Maintenance Management Systems towards Sustainable Development

    Directory of Open Access Journals (Sweden)

    M.A. Othuman Mydin

    2014-05-01

    Full Text Available Building maintenance management is an organized and effective system of maintenance operations which is set up to deal with problems related to the upkeep of a building. Its goal, aside from locating and remedying a building’s deficiencies, is to effectively minimize the overall costs of maintenance and is also an effort to maximize the gain and benefits from the savings. There are a few factors that influence decisions to undertake maintenance work. The principal goal of maintenance is to protect a building in the early stage of issues as they arise. Some major reasons for maintaining a building include retaining its reputation and value of investments, maintaining the building in a condition which allows it to accomplish its purpose, and presenting a good outer shell. This paper will review and discuss some of the major elements of building maintenance towards achieving sustainable buildings.

  14. Development of a maintenance manipulator for TFTR

    International Nuclear Information System (INIS)

    Holloway, C.

    1986-01-01

    The maintenance manipulator is a device permanently connected to the Tokamak Fusion Test Reactor (TFTR) vacuum vessel and is located in close proximity to the tokamak. It is used for the inspection and maintenance of in-vessel components whilst the machine remains under vacuum. The total system comprises a vacuum vessel ante-chamber that houses the manipulator, an articulated boom and carriage that transports and positions a dexterous end-effector, and end-effector that supports maintenance tooling, and an inspection system. Because of the maintenance manipulator's operating environment, there are many challenging engineering features, i.e., temperatures up to 150 0 C, changing magnetic fields in space and time that act on the manipulator whilst it is at rest, neutron neutron fluxes of up to 10/sup 11/cm/sup -2/s/sup -1/, and, last but not least, UHV conditions. This paper describes the development of the vacuum system, the maintenance manipulator, and inspective devices. It includes the methods employed to overcome the engineering difficulties and the application of information gained from other advanced technology programs, such as space and nuclear fission

  15. Pavement maintenance procedures with and without milling materials

    Directory of Open Access Journals (Sweden)

    Rafiqul A. Tarefder

    2016-01-01

    Full Text Available This study evaluates maintenance treatment followed by different Districts of New Mexico Department of Transportation (NMDOT. In addition, two case studies on the use of old pavement materials, called the “millings”, in maintenance projects are reported. Based on this study, it is observed that none of the Districts have a written procedure for maintenance work. Rather Districts rely on the experience of the maintenance crew for conducting maintenance projects. All Districts prefer to use chip seal for maintenance irrespective of distress conditions of the pavements. Patching and crack sealing are usually done before chip sealing to extend the life of the chip seals. Sand seal, scrub seal, and slurry seal projects are not done by District maintenance crews but by outside contractors. It is also observed that all Districts are interested in using millings in maintenance projects and most have already used millings in at least one maintenance project with some success and failure. Most of the Districts have used coarse fraction of millings in chip seal projects successfully. However, they failed to find a proper way to process the fine fractions of millings. Case Study I shows that fine millings can be used to construct thin overlay when mixed with emulsion in pug mill or hot drums. Case Study II concludes that fine millings can be used as fine/sand seal successfully following the same procedure and using the same equipment as chip seal. Keywords: Millings, Maintenance, Emulsion, Rutting, Pug-mill

  16. Expert system for maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ito, Tetsuo; Kasahara, Takayasu; Watanabe, Takao; Matsuki, Tsutomu.

    1989-01-01

    The basic function of the expert system which supports the maintenance works such as the diagnosis of nuclear power plants and the planning of maintenance works was developed. For the maintenance of large scale plants like nuclear power plants, much manpower is required. Consequently, it has been desired to develop the system for improving the maintainability by utilizing the expertise and empirical knowledge of skilled engineers. This system comprises the subsystems for aiding plant diagnosis and maintenance work planning. The former diagnoses the contents of out of order based on the knowledge base, and thereafter, guides the method of taking measures using simulator. The latter establishes the plan by using the method of limiting branching together so that the maintenance works do not interfere mutually or do not affect the operation. Hereafter, it is intended to improve the man-machine condition and expand knowledge aiming at the practical use. The outline of the system, the constitution of subsystems, the example of plant diagnosis, the support of plant maintenance work planning and so on are reported. (K.I.)

  17. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  18. Design Failure Affecting Maintenance Management on Public Higher Education Institution in Malaysia

    Directory of Open Access Journals (Sweden)

    Agus Salim Nuzaihan Aras

    2016-01-01

    Full Text Available The issue of government building defect is keeping on reporting in the media and arising since 2007. These issues of building defects, maintenance and management have existing and it is deliberated up to the parliament level. The government keep continue increased the maintenance allowance in National Budgetary in every year. However, the building disasters and failures keep going develop their number of cases in Malaysia. Most of the issues are related with a weak maintenance management and faulty in design. This reflects to a poorly building condition, create discomfort and danger environment to the building users. Besides, it will result to a low quality building condition and reflect to a weak building maintenance management. Building defects arise through inappropriate or poor design, specification, construction and it will give an impact to maintenance management itself [1]. Errors in the design of the building are being debated and becoming a reason of major factor in building defect reproduction [2]. Thus, this issue will discover the major cause in building design failure that develop the building defects and verify the impact of design defects towards building maintenance management. The study involved with the public higher education institution in Malaysia focusing on main campuses and the distribution of questionnaire to the facility and maintenance management department. This research is aimed to produce a better understanding on the impact of building design failure towards the institution facilities’ condition.

  19. Priority ranking for maintenance activities on embankment dams

    International Nuclear Information System (INIS)

    Chouinard, L.E.; Andersen, G.R.; Robichaud, J.G.; Blanchette, G.; Gervais, R.

    1998-01-01

    Operators of dams in Canada and the U.S. are steadily shifting from construction of new facilities to the maintenance and repairs of existing ones. This paper emphasized the importance of prioritizing maintenance activities on embankment dams whose maintenance needs vary from structure to structure. Two parallel procedures were developed, one for monitoring devices and the other for defense groups. Both procedures are intended to be used together to rate the condition of the embankment dams. The term 'defense groups' is used to refer to the collection of physical components on dams to prevent adverse conditions from occurring that would result in an uncontrolled release of the reservoir. The priority rankings and condition indices developed by means of this procedure reflects the judgment of a panel of engineers and geologists who implement them. They are not to be interpreted as an index of dam safety. While the process is sufficiently well developed to warrant wide-spread distribution, it is considered to be still in the developmental stage. Therefore, it should be used in conjunction with other parallel processes evaluating structural, mechanical and electrical features of the structure under consideration. 6 refs., 7 tabs

  20. Object and operation supported maintenance for mining equipment

    Directory of Open Access Journals (Sweden)

    Walter Bartelmus

    2014-09-01

    Full Text Available The paper aroused in answer to discussion in Mining Magazine (MM September 2011 and July/August 2013. The paper shows that discussion given in the MM issue July/August 2013 does not fulfill expectations expressed in MM issue 2011. The presented paper is the review on maintenance that is based on condition monitoring as tool for detection of faults and failure prevention. Fault and failure are regarded as inevitable during the machine operation as the process of wear and the process of degradation. The question is, if one can influence the wear and degradation process, using condition monitoring. The paper will present technology (in reference to cited papers which demonstrates that the use of the proper method can influence the wear and machine degradation process, using proper condition monitoring techniques and knowing scenarios of wear and degradation process, the maintenance can be rationalized. The presented paper shows possible improvements which are needed to fulfill expectations expressed in MM September 2011 and they are not taken into consideration in MM July/August 3013. These improvements can be fulfilling on the bases of object and operation supported maintenance.

  1. Application and issues of online maintenance for equipment of nuclear power plants

    International Nuclear Information System (INIS)

    Higasa, Hisakazu

    2011-01-01

    The maintenance systems for long-term safety and repair costs reduction of equipment of nuclear power plants are stated. Planned maintenance contained the breakdown maintenance (BM) and the preventive maintenance, which consists of the time based maintenance (MBM) and the condition based maintenance (CBM). Explained are the characteristics of equipments, maintenance methods, maintenance solutions and the self-evaluation maintenance power, damage mechanism and solutions, and monitoring tools and application. Stated are the maintenance system and application of monitoring technology, periodical maintenance, application of diagnosis, vibration monitoring techniques, decision of vibration monitoring, and application of monitoring techniques for improvement of maintenance. Illustrated are realization of planned maintenance by reorganization of maintenance, a trend of maintenance of equipments, table of classified maintenance systems, change of maintenance program, maintenance data and investigation of damage mechanism, examples of self-evaluation maintenance power, examples of analysis of damage of parts of equipments, evaluation of rotating machines by vibration method, examples of results of diagnosis of bearing of rotating machines, online maintenance system of Asahi Kasei Engineering Corporation, degradation pattern of pomp, estimation of lifetime by total vibration and vibration on acceleration, and improvement of equipments. (S.Y.)

  2. 30 CFR 57.8531 - Construction and maintenance of ventilation doors.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Construction and maintenance of ventilation... NONMETAL MINES Ventilation Underground Only § 57.8531 Construction and maintenance of ventilation doors... constructed of wood; (c) Maintained in good condition; (d) Self-closing, if manually operated; and (e...

  3. Safe affordable fission engine (SAFE 30) module conductivity test thermal model correlation

    International Nuclear Information System (INIS)

    Roman, Jose

    2001-01-01

    The SAFE 30 is a simple, robust space fission power system that is comprised of several independent modules. Each module contains 4 fuel tubes bonded to a central heatpipe. Fission energy is conducted from the fuel tubes to the heatpipe, which in turn transfers the energy to a power conversion system. This paper benchmarks a thermal model of the SAFE 30 with actual test data from simulated SAFE 30 module tests. Two 'dummy' SAFE 30 modules were fabricated - each consisted of 4 1-inch dia. tubes (simulating the fuel tubes) bonded to a central '1' dia. tube (simulating the heatpipe). In the first module the fuel tubes were simply brazed to the heatpipe along the line of contact (leaving void space in the interstices), and in the second module the tubes and heatpipe were brazed via tri-cusps that completely fill the interstices between the tubes. In these tests, fission energy is simulated by placing resistance heaters within each of the 4 fuel tubes. The tests were conducted in a vacuum chamber in 4 configurations: tri-cusps filled with and without an outer insulation wrap, and no tri-cusps with and without an outer insulation wrap. The baseline SAFE 30 configuration uses the brazed tri-cusps. During the tests, the power applied to the heaters was varied in a stepwise fashion, until a steady-state temperature profile was reached. These temperature levels varied between 773 K and 1073 K. To benchmark the thermal model, the input energy and chamber surface temperature were used as boundary conditions for the model. The analytical results from the nodes at the same location as the test thermocouples were plotted again test data to determinate the accuracy of the analysis. The unknown variables on the analysis are the radiation emissivity of the pipe and chamber and the radiation view factor between the module and the chamber. A correlation was determined using a parametric analysis by varying the surface emissivity and view factor until a good match was reached. This

  4. Environmentally safe system for treatment of bio corrosion of ETICS

    Directory of Open Access Journals (Sweden)

    Minarovičová Katarína

    2018-01-01

    Full Text Available Effects of microorganisms on building facades are responsible for aesthetic, bio-geophysical and biogeochemical deterioration. The process of cleaning of contaminated facades involves the removal and eradication of micro flora on the surface of insulation using chemical products, killing cells and eliminating all living mass, including organic ingredients. The removal of bio corrosion coating from ETICS structure by means of chemical and preservative substances (biocides is currently the only effective and most used technology. Uncontrolled leaching of the used biocides is unacceptable. Meantime, new technology for environmentally safe maintenance of ETICS is needed. Scientists have been working on replacement the biocides currently used in facades treatment with eco-friendly biocides that have no negative effects on the environment or human beings. While the eco- treatment will be available, safe dewatering of chemicals being leached from the surface of the facade could be provided by e.g. special drain systems adjusted to the building type, use and age. The paper gives an overview of the problem in context of Slovakia and examples of leaching systems designed for new and renovated buildings.

  5. Education and training of operators and maintenance staff at Hamaoka Nuclear Power Stations

    International Nuclear Information System (INIS)

    Makido, Hideki; Hayashi, Haruhisa

    1999-01-01

    At Hamaoka Nuclear Power Station, in order to ensure higher safety and reliability of plant operation, education and training is provided consistently, on a comprehensive basis, for all operating, maintenance and other technical staff, aimed at developing more capable human resources in the nuclear power division. To this end, Hamaoka Nuclear Power Station has the 'Nuclear Training Center' on its site. The training center provides the technical personnel including operators and maintenance personnel with practical training, utilizing simulators for operation training and the identical facilities with those at the real plant. Thus, it plays a central role in promoting comprehensive education and training concerning nuclear power generation. Our education system covers knowledge and skills necessary for the safe and stable operation of nuclear power plant, targeting new employees to managerial personnel. It is also organized systematically in accordance with experience and job level. We will report the present education and training of operators and maintenance personnel at Hamaoka Nuclear Training Center. (author)

  6. Improvement of testing and maintenance based on fault tree analysis

    International Nuclear Information System (INIS)

    Cepin, M.

    2000-01-01

    Testing and maintenance of safety equipment is an important issue, which significantly contributes to safe and efficient operation of a nuclear power plant. In this paper a method, which extends the classical fault tree with time, is presented. Its mathematical model is represented by a set of equations, which include time requirements defined in the house event matrix. House events matrix is a representation of house events switched on and off through the discrete points of time. It includes house events, which timely switch on and off parts of the fault tree in accordance with the status of the plant configuration. Time dependent top event probability is calculated by the fault tree evaluations. Arrangement of components outages is determined on base of minimization of mean system unavailability. The results show that application of the method may improve the time placement of testing and maintenance activities of safety equipment. (author)

  7. Maintenance methods

    International Nuclear Information System (INIS)

    Sanchis, H.; Aucher, P.

    1990-01-01

    The maintenance method applied at the Hague is summarized. The method was developed in order to solve problems relating to: the different specialist fields, the need for homogeneity in the maintenance work, the equipment diversity, the increase of the materials used at the Hague's new facilities. The aim of the method is to create a knowhow formalism, to facilitate maintenance, to ensure the running of the operations and to improve the estimation of the maintenance cost. One of the method's difficulties is the demonstration of the profitability of the maintenance operations [fr

  8. Development of a computational program to planning and control of the IEA-R1 reactor maintenance

    International Nuclear Information System (INIS)

    Martins, Mauro Onofre; Madi Filho, Tufic

    2013-01-01

    Maintenance is an essential activity in nuclear reactors. The components of safety systems of an industrial plant should have a low probability of failure, especially if there is a high risk of accidents that may cause environmental damage. In nuclear facilities, the presence of security systems is a technical specification and a requirement for their license and operation. In order to manage the entire information flow from the maintenance of the IEA-R1, a computational program (software) was developed, which not only plans and control all the maintenance, but also updates the documents and records to safeguard the quality, ensuring the safe operation of the reactor. The software has access levels and provides detailed reports of all maintenance planned and implemented, together with an individual history of the equipment during its lifetime in the facility. This work presents all the stages of the software development, description, compatibility, application, advantages and results obtained experimentally. (author)

  9. Human errors related to maintenance and modifications

    International Nuclear Information System (INIS)

    Laakso, K.; Pyy, P.; Reiman, L.

    1998-01-01

    The focus in human reliability analysis (HRA) relating to nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, some studies and incidents have shown that also maintenance errors, which have taken place earlier in plant history, may have an impact on the severity of a disturbance, e.g. if they disable safety related equipment. Especially common cause and other dependent failures of safety systems may significantly contribute to the core damage risk. The first aim of the study was to identify and give examples of multiple human errors which have penetrated the various error detection and inspection processes of plant safety barriers. Another objective was to generate numerical safety indicators to describe and forecast the effectiveness of maintenance. A more general objective was to identify needs for further development of maintenance quality and planning. In the first phase of this operational experience feedback analysis, human errors recognisable in connection with maintenance were looked for by reviewing about 4400 failure and repair reports and some special reports which cover two nuclear power plant units on the same site during 1992-94. A special effort was made to study dependent human errors since they are generally the most serious ones. An in-depth root cause analysis was made for 14 dependent errors by interviewing plant maintenance foremen and by thoroughly analysing the errors. A more simple treatment was given to maintenance-related single errors. The results were shown as a distribution of errors among operating states i.a. as regards the following matters: in what operational state the errors were committed and detected; in what operational and working condition the errors were detected, and what component and error type they were related to. These results were presented separately for single and dependent maintenance-related errors. As regards dependent errors, observations were also made

  10. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    to oil and gas structures. In addition, condition monitoring systems are often available, and the information should be taken into account when making decisions. In this thesis, methods for risk-based maintenance planning using Bayesian methods are investigated, with the aim of making optimal decisions......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...... considering all available information. First, a theoretical damage model is formulated, the model is then updated using condition monitoring data, and the updated model is used as basis for risk-based decision making. Several approaches for solving the decision problems have been considered: various types...

  11. Guideline for the procedure of preparing and executing of maintenance and modifications in nuclear power plants (dated May 10th, 1978)

    International Nuclear Information System (INIS)

    1978-01-01

    Based on the terms defined for this guideline and on legal provisions, it is the purpose of this guideline to render a contribution to the guaranteeing of safe operation and to foster the safety of work while taking the safety of the plant into account by means of a uniform procedure for the preparation and execution of maintenance and modifications carried out in nuclear power plants. The criteria to be taken into account and the procedural steps necessary, organisational measures and controls, technical aspects to be taken into account and determinations to be made are given. Matters concerning plant safety (protection of objects) are pointed out, if they are to be taken into account as marginal conditions when determining measures for the safety of work and the safety of the plant. The guideline serves as a basis for the set-up and assessment of a maintenance-regulation adapted to the resp. organisation of the plant and for the elaboration and check-up of the detailed complementary documents as e.g. accident report blanks, cut-off blanks and safety certificates. (orig.) [de

  12. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  13. Construction and maintenance of underground mine roads

    Energy Technology Data Exchange (ETDEWEB)

    Logan, A.S.; Seedsman, R.W. [Coffey Partners International Pty. Ltd. (Australia)

    1995-12-31

    Good roads are essential in moving men and materials to and from the underground workplace. An underground coal industry funded project was recently completed on underground mine road construction and maintenance. This paper discusses practical approaches to construction and maintenance of underground mine roads using transferable civil technologies and innovative techniques. Mine pavements are generally low-cost (relative to civil roads), constructed to varying standards using locally available materials to best meet the mobility needs of the mine. Performance of pavements is thus largely dependent on the environmental conditions, quality of the available road making materials, maintenance policies and available resources. This paper explains the causes of bad roads in various underground environments. It details available management strategies, construction and water control techniques, road maintenance and vehicle considerations. It concludes that the trend to larger rubber tires mining equipment needs to be matched with construction and maintenance of high quality road surfaces. For large operations, the total cost due to poor roads may equate to in excess of $A1 million per annum. The strategies outlined in this paper provide the basis for construction and maintenance of underground mine roads to help achieve desired production targets. (author). 2 tabs., 4 figs., 7 refs.

  14. Three days rush venom immunotherapy in bee allergy: safe, inexpensive and instantaneously effective.

    Science.gov (United States)

    Goldberg, Arnon; Yogev, Ayala; Confino-Cohen, Ronit

    2011-01-01

    Rush venom immunotherapy (VIT) is highly effective in vespid venom allergy, but comparable data regarding bee venom (BV) allergy are sparse. We evaluated its safety, efficacy and cost in BV-allergic patients. Conventional or rush VIT were offered to all patients with systemic reaction to insect sting. Rush VIT was also given to hyperreactive patients who failed to reach the maintenance dose with conventional VIT due to multiple systemic reactions. In BV-allergic patients, honeybee sting challenge was performed within 1 week after reaching the maintenance dose. 179 patients, some of them allergic to more than one venom, received 246 rush VIT courses. Bee VIT was administered to 132 patients (73.7%); 173 patients (96.6%) reached the maintenance dose. The incidence of systemic reactions was 29.6%. They were more common in VIT with BV than with vespid venoms (31.1 and 16.3%, respectively, p = 0.01). After excluding the hyperreactive subgroup (n = 20), this difference was not significant (23.7 and 16%, respectively, p = 0.19). Despite the high incidence of systemic reactions (15 of 20, 75%) among hyperreactive patients, 17 patients (85%) achieved the maintenance dose. Sting challenges resulted in systemic reaction in 4 of 8 (50%) hyperreactive patients and in 2 of 47 (4.3%) ordinary patients. The cost of rush VIT was 41% of that of conventional VIT. Rush VIT with BV is safe, instantaneously effective, less expensive and enables most patients with previous failures of conventional VIT to reach the maintenance dose. Copyright © 2011 S. Karger AG, Basel.

  15. Asymptotically Safe Standard Model via Vectorlike Fermions

    Science.gov (United States)

    Mann, R. B.; Meffe, J. R.; Sannino, F.; Steele, T. G.; Wang, Z. W.; Zhang, C.

    2017-12-01

    We construct asymptotically safe extensions of the standard model by adding gauged vectorlike fermions. Using large number-of-flavor techniques we argue that all gauge couplings, including the hypercharge and, under certain conditions, the Higgs coupling, can achieve an interacting ultraviolet fixed point.

  16. How safe is safe enough?

    International Nuclear Information System (INIS)

    Desnoyers, B.; Chanzy, Y.

    2004-01-01

    The IAEA Regulations for the Safe Transport of Radioactive Material, were historically established with the objective to reduce the probability that persons be exposed to unacceptable doses due to normal operation or accident situations during transport of radioactive material. Based on the International Basic Safety Standards for Protection against Ionizing Radiation (BSS), the definition, which was adopted for an unacceptable dose for an accident situation, is the excess of the maximum dose limits permissible in a single year for the occupational exposure of a worker in the BSS. Concerning the severity of accident situations, it has always be clearly stated that the objective of the tests for demonstrating ability to withstand accident conditions of transport was not to cover every accident condition, but solely most of them. The last available evaluations regarding the rate of accidents which are covered by the standardised accident conditions of transport defined in the IAEA Regulations give a range of about 80%, plus or minus 15% which depends on transport mode and studies. Consequently, slight variations in the capabilities of the packages to meet the specified performance would probably not have significant consequences on the protection level in case of accident. In the assessment of the compliance with the regulations, the tendency of experts, taking advantage of the enhanced performances of computer calculation codes, is to ask more and more calculations, with more and more accuracy, leading to more and more restrictions. Consequently, cost and delay are considerably increased without any evidence of an equivalent effect on the level of protection. This paper will initiate a reflection on the general objectives and principles when implementing the Regulations, in such a way that demonstrations remain cost effective, taking into account evolution of the techniques and a high level of safety

  17. Actual Condition of Paddy Field Levee Maintenance by Various Farm Households including Large-scale Farming in the Developed Land Renting Area

    Science.gov (United States)

    Sakata, Yasuyo

    The survey of interview, resource acquisition, photographic operation, and questionnaire were carried out in the “n” Community in the “y” District in Hakusan City in Ishikawa Prefecture to investigate the actual condition of paddy field levee maintenance in the area where land-renting market was proceeding, large-scale farming was dominant, and the problems of geographically scattered farm-land existed. In the study zone, 1) an agricultural production legal person rent-cultivated some of the paddy fields and maintained the levees, 2) another agricultural production legal person rent-cultivated some of the soy bean fields for crop changeover and land owners maintained the levees. The results indicated that sufficient maintenance was executed on the levees of the paddy fields cultivated by the agricultural production legal person, the soy bean fields for crop changeover, and the paddy fields cultivated by the land owners. Each reason is considered to be the managerial strategy, the economic incentive, the mutual monitoring and cross-regulatory mechanism, etc.

  18. Education and training of operators and maintenance staff at commercial nuclear power stations in Japan

    International Nuclear Information System (INIS)

    Takahashi, M.; Kataoka, H.

    1998-01-01

    Safe and stable operation of a nuclear power station requires personnel fostering. In Japan, with the objectives of systematically securing qualified people for a long period of time, and maintaining and improving their skills and knowledge, the utilities have created strict personnel training plans, for continuous education and training. Concrete examples of education and training for operators and maintenance personnel at commercial nuclear power stations in Japan, such as education systems training, facility and contents of curriculum, are detailed including some related matters. Recent activities to catch up with environment changes surrounding education and training of operators and maintenance staff are also mentioned. (author)

  19. Use of Frequency Distribution Functions to Establish Safe Conditions in Relation to the Foodborne Pathogen Bacillus cereus

    Directory of Open Access Journals (Sweden)

    Begoña Delgado

    2005-01-01

    Full Text Available Minimal processing implementation greatly depends on a detailed knowledge of the effects of preservation factors and their combinations on the spoilage and foodborne pathogenic microorganisms. The effectiveness of mild preservation conditions will become increasingly dependent on a more stochastic approach linking microbial physiological factors with product preservation factors. In this study, the validity of frequency distributions to efficiently describe the inactivation and growth of Bacillus cereus in the presence of natural antimicrobials (essential oils has been studied. For this purpose, vegetative cells were exposed to 0.6 mM of thymol or cymene, obtaining survival curves that were best described by the distribution of Weibull, since a tailing effect was observed. B. cereus was also exposed in a growth medium to a low concentration (0.1 mM of both antimicrobials, separately or combined, and the lag times obtained were fitted to a normal distribution, which allowed a description of dispersion of the start of growth. This allowed a more efficient evaluation of the experimental data to establish safe processing conditions according to accurate parameters and their implementation in risk assessment.

  20. Wireless sensors for predictive maintenance of rotating equipment in research reactors

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    2011-01-01

    In 2008-2009, the High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) tested the potential of predictive or condition-based maintenance techniques to reduce maintenance costs, minimize the risk of catastrophic failures, and maximize system availability by attaching wireless-based sensors to selected rotating equipment at HFIR. Rotating equipment is an ideal 'test case' for the viability of integrated, online predictive maintenance strategies because motors, bearings, and shafts are ubiquitous in nuclear power plants and because the maintenance methods typically performed on rotating equipment today (such as portable or handheld vibration data collection equipment) are highly labor-intensive. The HFIR project achieved all five of its objectives: (1) to identify rotating machinery of the types used in research reactors and determine their operational characteristics, degradation mechanisms, and failure modes, (2) to establish a predictive maintenance program for rotating equipment in research reactors, (3) to identify wireless sensors that are suitable for predictive maintenance of rotating machinery and test them in a laboratory setting, (4) to establish the requirements and procedures to be followed when implementing wireless sensors for predictive maintenance in research reactors, and (5) to develop a conceptual design for a predictive maintenance system for research reactors based on wireless sensors. The project demonstrated that wireless sensors offer an effective method for monitoring key process conditions continuously and remotely, thereby enhancing the safety, reliability, and efficiency of the aging research reactor fleet.

  1. The determination of nutritional requirements for Safe Haven Food Supply System (emergency/survival foods)

    Science.gov (United States)

    Ahmed, Selina

    1987-01-01

    The Space Station Safe Haven Food System must sustain 8 crew members under emergency conditions for 45 days. Emergency Survival Foods are defined as a nutritionally balanced collection of high density food and beverages selected to provide for the survival of Space Station flight crews in contingency situations. Since storage volume is limited, the foods should be highly concentrated. A careful study of different research findings regarding starvation and calorie restricted diets indicates that a minimum nutritional need close to RDA is an important factor for sustaining an individual's life in a stressful environment. Fat, protein, and carbohydrates are 3 energy producing nutrients which play a vital role in the growth and maintenance process of human life. A lower intake of protein can minimize the water intake, but it causes a negative nitrogen balance and a lower performance level. Other macro and micro nutrients are also required for nutritional interrelationships to metabolize the other 3 nutrients to their optimum level. The various options for longer duration than 45 days are under investigation.

  2. Maintenance as a safety issue.

    Science.gov (United States)

    White, Jim

    2008-11-01

    Because safety is related to electrical power systems maintenance, it seems reasonable to assume there could be legal issues if maintenance is not performed. OSHA has not yet taken the stand that not performing maintenance as required by the manufacturer, NFPA 70B, or ANSI/NETA MTS-07 constitutes a willful violation. OSHA defines a willful citation as one where: "the employer knowingly commits with plain indifference to the law. The employer either knows that what he or she is doing constitutes a violation, or is aware that a hazardous condition existed and made no reasonable effort to eliminate it". However, NFPA 70E 2009 requires this maintenance, and OSHA has stated on its Web site that NFPA 70E is "a guide for meeting the requirements of the OSHA electrical regulations". In addition, federal courts have found that NFPA 70E is "standard industry practice." Once a company receives and accepts a willful citation, especially if received as the result of an accident investigation, its worker's compensation protection no longer shields it. One definition given by a trial attorney for a willful citation was that it is equal to negligent behavior. Be smart: Maintain that equipment and save yourself major problems, including unscheduled shutdowns and possible litigation.

  3. Study on risk indicator for appropriate plant maintenance considering aging effect

    International Nuclear Information System (INIS)

    Mano, Akihiro; Yamaguchi, Akira; Takata, Takashi

    2014-01-01

    Since, nuclear power plants run for a long term and plant component may deteriorate due to aging, plant safety must be maintained through maintenance activities of components. The maintenance will become more important as the number of aged plant increases. In the planning of maintenance, one must select appropriate components and interval. In general, Fussell-Vesely importance (FV) and Risk Achievement Worth (RAW) are used as a risk indicator for the maintenance. A priority order of each component can be evaluated using those risk indicators at a certain condition. However, the influence of aging (time history) on the order cannot be estimated directly. In the paper, a change of conditional core damage probability (ΔCCDP) and a change of conditional containment failure probability (ΔCCFP) are proposed as additional indicators in which the aging effect is evaluated directly so as to determine the priority order. A simplified level one probabilistic risk assessment (PRA) has been carried out in order to investigate the change of the risk indicators by considering the change of a component failure probability due to aging. In the analyses, three conditions are assumed; base (original) state, aging state and further aging state without maintenance activities. It is demonstrated that the proposed indicator (ΔCCDP and ΔCCFP) reveals the aging effect of each component, while the change of the FV and RAW represent unrealistic behavior through the states. As a result, it is found that the ΔCCDP and ΔCCFP are superior to the others in terms of the ability to evaluate components appropriately in deteriorated (aging) states and take account of differences of deterioration behavior. It is also found that the priority order of the multiple-components maintenance at the same time can also be evaluated using the ΔCCDP and ΔCCFP. Additionally, a risk informed decision making based on the risk acceptance criteria can be discussed for the maintenance procedure using the

  4. Efficiency of defect specific maintenance od steam generator tubes: the case of ODSCC

    International Nuclear Information System (INIS)

    Cizelj, L.; Dvorsek, T.

    1996-01-01

    The outside diameter stress corrosion cracking at tube support plates became the dominating ageing mechanism in steam generators tubes made of Inconel 600. A variety of maintenance approaches were developed and implemented worldwide to deal with this mechanism. Despite different philosophical and physical backgrounds implemented, all of the applied approaches satisfy the relevant regulatory requirements. For our purpose, the maintenance approach consist of: (1) inspection of tubes, (2) accepting or rejecting the defective tube and (3) plugging of rejected tubes. The problem of selecting an optimal maintenance approach is raised in the paper. Consequently, a method comparing the efficiency of applicable maintenance approaches is proposed. The efficiency is defined by three parameters: (a) number of plugged tubes, (b) probability of steam generator tube rupture and (c) predicted accidental leak rates through the defects. An original probabilistic model is proposed to quantify the probability of tube rupture, while procedures available in literature were used to define the accidental leak rates. The numerical example considers the data from Krsko NPP (Westinghouse 632 MWe). The maintenance approaches analyzed include: (i) no repair at all, (ii) traditional defect depth (40%) based maintenance, (iii) alternate plugging criterion (bobbin coil voltage as defined by EPRI and U.S. NRC) and (iv) combined traditional and alternate approach. Advantages of the defect specific approaches (iii) and (iv) over the traditional one (defect depth) are clearly shown. A brief discussion on the optimization of safe life of steam generator is given. (author)

  5. Use of probabilistic risk assessment in maintenance activities at Palo Verde

    International Nuclear Information System (INIS)

    Lindquist, R.C.; Pobst, D.S.

    1993-01-01

    Probabilistic risk assessment (PRA) is an important tool in addressing various maintenance activities. At the Palo Verde nuclear generating station (PVNGS), the PRA has been used in a variety of ways to support a wide and diverse selection of maintenance-related activities. For on-line or at-power maintenance, the PRA was used to evaluate combinations of maintenance activities possible with the 12-week or floating maintenance schedule. The maintenance schedule was evaluated to identify any higher risk, undesirable combinations of equipment outages, such as the sole steam-driven auxiliary feedwater pump and the same train emergency diesel generator. Table I is a sampling of the results from the maintenance schedule evaluation in terms of increase in conditional core damage frequency (CDF) above the base- line value due to maintenance on some important key safety systems and combinations thereof. The baseline CDF is 7.4 x 10 -7 per 72 h

  6. Predictive maintenance policy for a gradually deteriorating system subject to stress

    Energy Technology Data Exchange (ETDEWEB)

    Deloux, E. [IRCCyN/Ecole des Mines de Nantes, Nantes (France); Castanier, B. [IRCCyN/Ecole des Mines de Nantes, Nantes (France)], E-mail: bruno.castanier@emn.fr; Berenguer, C. [Universite de Technologie de Troyes/CNRS, Troyes (France)

    2009-02-15

    This paper deals with a predictive maintenance policy for a continuously deteriorating system subject to stress. We consider a system with two failure mechanisms which are, respectively, due to an excessive deterioration level and a shock. To optimize the maintenance policy of the system, an approach combining statistical process control (SPC) and condition-based maintenance (CBM) is proposed. CBM policy is used to inspect and replace the system according to the observed deterioration level. SPC is used to monitor the stress covariate. In order to assess the performance of the proposed maintenance policy and to minimize the long-run expected maintenance cost per unit of time, a mathematical model for the maintained system cost is derived. Analysis based on numerical results are conducted to highlight the properties of the proposed maintenance policy in respect to the different maintenance parameters.

  7. Predictive maintenance policy for a gradually deteriorating system subject to stress

    International Nuclear Information System (INIS)

    Deloux, E.; Castanier, B.; Berenguer, C.

    2009-01-01

    This paper deals with a predictive maintenance policy for a continuously deteriorating system subject to stress. We consider a system with two failure mechanisms which are, respectively, due to an excessive deterioration level and a shock. To optimize the maintenance policy of the system, an approach combining statistical process control (SPC) and condition-based maintenance (CBM) is proposed. CBM policy is used to inspect and replace the system according to the observed deterioration level. SPC is used to monitor the stress covariate. In order to assess the performance of the proposed maintenance policy and to minimize the long-run expected maintenance cost per unit of time, a mathematical model for the maintained system cost is derived. Analysis based on numerical results are conducted to highlight the properties of the proposed maintenance policy in respect to the different maintenance parameters

  8. Field maintenance of radiation-shielding windows at HFEF

    International Nuclear Information System (INIS)

    Tobias, D.A.

    1983-01-01

    The achievement of excellent viewing through hot-cell shielding windows does not occur by chance. Instead, it requires a well planned and executed program of field maintenance. The lack of such a program is a major factor when a hot-cell facility has poor window viewing. At HFEF, all preventive maintenance is performed by one group of trained technical-support personnel under the immediate direction of a Systems Engineer, who has responsibility for the shielding windows. Window maintenance is prescheduled and recorded by being incorporated into the computerized Maintenance Data System (MDS). Measurements of window light transmission are scheduled annually to determine glass browning or oil cloudiness conditions within the window tank. The tank oil is sampled and chemically analyzed annually to determine the moisture content, the acidity, and the probable deterioration rate caused by irradiation

  9. LACK OF AWARENESS ABOUT SAFE BLOOD IN PAKISTANI POPULATION

    Directory of Open Access Journals (Sweden)

    Muhammad Usman

    2014-12-01

    Full Text Available Blood transfusion is a life saving procedure in various transfusion-dependent life threatening conditions and donation of safe blood is a prerequisite for achieving this goal. This study was designed to evaluate the awareness regarding “safe blood” in Pakistani population. This study was conducted at a large scale through a population survey. The test population was divided into two groups i.e. general population and students. The Performa was designed for a general and student population and included 20 questions related to awareness of safe blood. A total of 4900 individuals belonging to different ethnic groups were included in this population survey. Results of social survey were analyzed by using Usman and Moin awareness chart. Results of this study revealed profound unawareness about safe blood in Pakistani population. This study found lack of awareness about safe blood as a major factor that is playing a vital role in the propagation of blood borne diseases in Pakistan. To secure the recipients from blood borne complications through blood donation, it is necessary to create effective awareness about safe blood in Pakistani population.

  10. Model for cost economic analysis in the maintenance of distribution networks

    International Nuclear Information System (INIS)

    Flores, N.; Leite, O.C.; Abe, R.Y.; Violante, R.A.

    1989-01-01

    A methodology for evaluating the costs from aerial distribution networks maintenance is described, aiming give a tool for the planning decisions, with the purpose to keeping the system operating in equilibrium conditions between the resources invested on the preventive and corrective maintenance. (C.G.C.)

  11. Maintenance of fire systems and equipment at Virginia Power

    International Nuclear Information System (INIS)

    Doubrely, E.B. Jr.

    1989-01-01

    The basics of fire protection systems maintenance are well codified and documented in the National Fire Codes published by the National Fire Protection Association. In addition, Insurers often promulgate minimum standards for fire protection systems design and maintenance to which they attach conditions of insurability. Regulatory agencies and even in-house corporate policies can impact the maintenance of fire protection systems and equipment. This presentation will focus on the various methods and alternate ways of performing system maintenance, whether required by code, insurer, or by some regulatory commitment at Virginia Powers North Anna and Surry nuclear power stations. The approach to performing similar work is handled differently at each station. This difference can be attributed to proximity to outside assistance as well as plant philosophy. In addition to station maintenance practices, a discussion of in-house servicing of portable fire suppression equipment is offered. 1 tab

  12. The SafeCOP ECSEL Project: Safe Cooperating Cyber-Physical Systems Using Wireless Communication

    DEFF Research Database (Denmark)

    Pop, Paul; Scholle, Detlef; Hansson, Hans

    2016-01-01

    This paper presents an overview of the ECSEL project entitled "Safe Cooperating Cyber-Physical Systems using Wireless Communication" (SafeCOP), which runs during the period 2016 -- 2019. SafeCOP targets safety-related Cooperating Cyber-Physical Systems (CO-CPS) characterised by use of wireless...... detection of abnormal behaviour, triggering if needed a safe degraded mode. SafeCOP will also develop methods and tools, which will be used to produce safety assurance evidence needed to certify cooperative functions. SafeCOP will extend current wireless technologies to ensure safe and secure cooperation...

  13. Expert system for maintenance management of a boiling water reactor power plant

    International Nuclear Information System (INIS)

    Hong Shen; Liou, L.W.; Levine, S.; Ray, A.; Detamore, M.

    1992-01-01

    An expert system code has been developed for the maintenance of two boiling water reactor units in Berwick, Pennsylvania, that are operated by the Pennsylvania Power and Light Company (PP and L). The objective of this expert system code, where the knowledge of experienced operators and engineers is captured and implemented, is to support the decisions regarding which components can be safely and reliably removed from service for maintenance. It can also serve as a query-answering facility for checking the plant system status and for training purposes. The operating and maintenance information of a large number of support systems, which must be available for emergencies and/or in the event of an accident, is stored in the data base of the code. It identifies the relevant technical specifications and management rules for shutting down any one of the systems or removing a component from service to support maintenance. Because of the complexity and time needed to incorporate a large number of systems and their components, the first phase of the expert system develops a prototype code, which includes only the reactor core isolation coolant system, the high-pressure core injection system, the instrument air system, the service water system, and the plant electrical system. The next phase is scheduled to expand the code to include all other systems. This paper summarizes the prototype code and the design concept of the complete expert system code for maintenance management of all plant systems and components

  14. Clobetasol propionate shampoo 0.05% is efficacious and safe for long-term control of scalp psoriasis.

    Science.gov (United States)

    Poulin, Yves; Papp, Kim; Bissonnette, Robert; Guenther, Lyn; Tan, Jerry; Lynde, Charles; Kerrouche, Nabil; Villemagne, Hervé

    2010-01-01

    Clobetasol propionate (CP) shampoo 0.05% is an efficacious and safe treatment for scalp psoriasis. The aim of this double-blind, randomized, placebo-controlled study was to determine if CP shampoo is suitable for long-term disease control. Participants with moderate to severe scalp psoriasis (global severity score [GSS] of 3 or 4 on a scale of 0 [clear] to 5 [very severe]) first received once daily CP shampoo treatment for up to 4 weeks. Responders were subsequently randomized to receive the CP shampoo or vehicle twice weekly maintenance regimen for up to 6 months. When relapse occurred (defined as GSS > 2), participants resumed once daily CP shampoo treatment; when symptoms diminished (GSS shampoo did not relapse compared with participants treated with vehicle (P shampoo group. After 6 months 31.1% (33/106) of participants in the CP shampoo group were still relapse free versus 8.1% (9/111) of participants in the vehicle group. There was no greater incidence of skin atrophy, telangiectasia, or hypothalamic-pituitary-adrenal (HPA) axis suppression in the CP shampoo group compared with the vehicle group. Clobetasol propionate shampoo is efficacious and safe for acute management and long-term maintenance of moderate to severe scalp psoriasis.

  15. Upgrading of operation and maintenance. Lessons learned by ENEL- Nuclear Plant Management

    International Nuclear Information System (INIS)

    Bolla, Giuseppe; Panini, Giulio

    1999-01-01

    radioactive waste treatment, conditioning and storage. Garigliano and Latina NPPs are almost in 'safe store' condition. Trino and Caorso begin this year the site activities. The paper presents also the operation and maintenance abroad activities, particularly in the startup and operation of Laguna Verde NPP (Mexico) and Cernavoda NPP (Romania). Also activities and training and emergency planning are reviewed

  16. A Novel Short-Term Maintenance Strategy for Power Transmission and Transformation Equipment Based on Risk-Cost-Analysis

    Directory of Open Access Journals (Sweden)

    Hang Yang

    2017-11-01

    Full Text Available Current studies on preventive condition-based maintenance of power transmission and transformation equipment mainly focus on mid-term or long-term maintenance, and cannot meet the requirements of short-term especially temporary maintenance. In order to solve the defects of the present preventive maintenance strategies, according to the engineering application and based on risk-cost analysis, a short-term maintenance strategy is proposed in this manuscript. For the equipment working in bad health condition, its active maintenance costs and operation risk costs are evaluated, respectively. Then the latest maintenance time is calculated in accordance with the principle that its operation risk costs are no higher than active maintenance costs. Utilizing the latest maintenance time, the best maintenance time is calculated by setting the maximum relative earnings of postponing maintenance as the target, which provides the operation staffs with comprehensive maintenance-decision support. In the end, different cases on the IEEE 24-bus system are simulated. The effectiveness and advantages of the proposed strategy are demonstrated by the simulation results.

  17. Assessment and improvement of urban streets maintenance: Case study Kragujevac

    Directory of Open Access Journals (Sweden)

    Jokanović Igor

    2017-01-01

    Full Text Available City of Kragujevac struggles with providing road maintenance services due to limited funds and low capacity within the existing Public Utility Companies. As a solution to problems with traditional methods of contracting, many road authorities have moved to contracting road maintenance works to the private sector based on performance measures. The paper presents the outcomes of the study conducted for the purpose of improving current practice and condition of urban network within the City of Kragujevac through the application of performance-based maintenance contracting.

  18. Condition-based maintenance for a system subject to a non-homogeneous wear process with a wear rate transition

    Energy Technology Data Exchange (ETDEWEB)

    Fouladirad, Mitra, E-mail: mitra.fouladirad@utt.f [Universite de Technologie de Troyes, Institut Charles Delaunay, FRE CNRS 2848, 12 rue Marie Curie, 10010 Troyes (France); Grall, Antoine [Universite de Technologie de Troyes, Institut Charles Delaunay, FRE CNRS 2848, 12 rue Marie Curie, 10010 Troyes (France)

    2011-06-15

    The aim of this paper is to propose an adaptive maintenance model for a gradually deteriorating system. The system considered initially deteriorates with a nominal deterioration rate and at an unknown time the system's deterioration rate changes and the new deterioration rate is a time-dependent function. To deal with the transition of mode of deterioration in the framework of the maintenance decision rule an adequate online change detection algorithm is used. The maintenance decision rule is chosen in order to minimise the total maintenance cost including the cost of unavailability. The main result of this paper is to point out the interest of using a detection algorithm and hence the appreciation of a decision rule which takes into account transitions in the deterioration rate.

  19. Condition-based maintenance for a system subject to a non-homogeneous wear process with a wear rate transition

    International Nuclear Information System (INIS)

    Fouladirad, Mitra; Grall, Antoine

    2011-01-01

    The aim of this paper is to propose an adaptive maintenance model for a gradually deteriorating system. The system considered initially deteriorates with a nominal deterioration rate and at an unknown time the system's deterioration rate changes and the new deterioration rate is a time-dependent function. To deal with the transition of mode of deterioration in the framework of the maintenance decision rule an adequate online change detection algorithm is used. The maintenance decision rule is chosen in order to minimise the total maintenance cost including the cost of unavailability. The main result of this paper is to point out the interest of using a detection algorithm and hence the appreciation of a decision rule which takes into account transitions in the deterioration rate.

  20. The importance of maintainability in maintenance cost management

    International Nuclear Information System (INIS)

    Allen, R.R.

    1996-01-01

    This paper provides specific examples and results from ongoing projects at Power Plants, and for offshore oil platforms. The paper describes the vital role maintainability has on plant availability. How the application of equipment maintainability principles, if addressed using state of the art computer tools and advanced business processes can bring annual return on investment results as high as 15 to 1. The maintenance process of today and for the future must provide for high plant availability at the lowest possible cost. The high cost of obtaining equipment reliability levels necessary to meet required availability demands has not proved to be sustainable. Therefore new business decision processes that address equipment failures as part of the maintenance process have been developed. Repair costs require that equipment failures be selective and controlled so that a high level of safety and plant availability is assurance. This can only be accomplished by the use of advanced computer tools in the hands of well trained maintenance-engineering specialist. The relationship between Reliability Centered Maintenance (RCM), Condition Directed Planned Maintenance (CDPM), and maintainability is also presented

  1. Prioritization of pavement maintenance sections using objective based Analytic Hierarchy Process

    Directory of Open Access Journals (Sweden)

    Sarfaraz Ahmed

    2017-03-01

    Full Text Available The application of Analytic Hierarchy Process (AHP method for the prioritization of pavement maintenance sections is widespread now-a-days. Although the evaluation of pavement maintenance section through AHP method is simple, where the relative importance (on Saaty’s scale assigned to each parameter in the hierarchy varies between the experts (transportation professionals consulted, which leads to discrepancies in the final rankings of the sections’, due to the subjectivity in the process. Further, experts base their decisions solely on their experience while consideration is not given to the actual quantitative physical condition of the roads. To overcome these difficulties an objective based AHP method is proposed in this study, where pairwise comparison values are assigned based on the collected field data from a road network in Mumbai city, consisting of 28 road sections. The final ranking list of candidate sections takes into consideration the priority weight of alternatives, which reflect the road conditions. The solution of priority ratings of AHP method is compared with the corresponding solution of road condition index method, a traditional pavement maintenance procedure. The findings of the present study suggest that objective based AHP method is more suitable for the prioritization of pavement maintenance of roads. Keywords: Prioritization, Analytic Hierarchy Process, Road condition index, Objective method, Rating and ranking

  2. Safe Kids Worldwide

    Science.gov (United States)

    ... Blog Videos Newsletter facebook twitter instagram pinterest gplus youtube Search Menu Why It Matters Who We Are What We Do Find Your Safe Kids Safe Kids Day Main menu Keeping All Kids Safe Safety Tips Get Involved 4 Star Charity Donate Text Burns and Scalds 4 tips ...

  3. Implementation strategies and tools for condition based monitoring at nuclear power plants

    International Nuclear Information System (INIS)

    2007-05-01

    There is now an acute need to optimize maintenance to improve both reliability and competitiveness of nuclear power plant operation. There is an increasing tendency to move from the preventive (time based) maintenance concept to one dependent on plant and component conditions. In this context, various on-line and off-line condition monitoring and diagnostics, nondestructive inspection techniques and surveillance are used. Component selection for condition based maintenance, parameter selection for monitoring condition, evaluation of condition monitoring results are issues influencing the effectiveness of condition based maintenance. All these selections of components and parameters to be monitored, monitoring and diagnostics techniques to be used, acceptance criteria and trending for condition evaluation, and the economic aspect of predictive maintenance and condition monitoring should be incorporated into an integrated, effective condition based maintenance programme, which is part of the plant's overall maintenance optimization programme. This publication collects and analyses proven condition based maintenance strategies and techniques (engineering and organizational) in Member States. It includes selected papers on maintenance optimization presented during its preparation. This report was prepared under IAEA project on integrated NPP life cycle management including decommissioning. The main objective of an integrated life cycle management programme is to enable NPP's to compete, without compromising safety, successfully in the changing energy markets throughout their service life and to facilitate life extension and eventual decommissioning through improved engineering, technological, economic and managerial actions. The technical working group on NPP life management and other advisory groups nominated by the Member States provide recommendations on high priority needs of Member States in this area

  4. Optimal Maintenance of a Production System with Intermediate Buffers

    Directory of Open Access Journals (Sweden)

    Constantinos C. Karamatsoukis

    2012-01-01

    Full Text Available We consider a production-inventory system that consists of an input-generating installation, a production unit and L intermediate buffers. It is assumed that the installation transfers the raw material to buffer and the production unit pulls the raw material from buffer We consider the problem of the optimal preventive maintenance of the installation if the installation deteriorates stochastically with usage and the production unit is always in operative condition. We also consider the problem of the optimal preventive maintenance of the production unit if the production unit deteriorates stochastically with usage and the installation is always in operative condition. Under a suitable cost structure and for given contents of the buffers, it is proved that the average-cost optimal policy for the first (second problem initiates a preventive maintenance of the installation (production unit if and only if the degree of deterioration of the installation (production unit exceeds some critical level. Numerical results are presented for both problems.

  5. Sensor-driven, fault-tolerant control of a maintenance robot

    International Nuclear Information System (INIS)

    Moy, M.M.; Davidson, W.M.

    1987-01-01

    A robot system has been designed to do routine maintenance tasks on the Sandia Pulsed Reactor (SPR). The use of this Remote Maintenance Robot (RMR) is expected to significantly reduce the occupational radiation exposure of the reactor operators. Reactor safety was a key issue in the design of the robot maintenance system. Using sensors to detect error conditions and intelligent control to recover from the errors, the RMR is capable of responding to error conditions without creating a hazard. This paper describes the design and implementation of a sensor-driven, fault-tolerant control for the RMR. Recovery from errors is not automatic; it does rely on operator assistance. However, a key feature of the error recovery procedure is that the operator is allowed to reenter the programmed operation after the error has been corrected. The recovery procedure guarantees that the moving components of the system will not collide with the reactor during recovery

  6. The role of human error in risk analysis: Application to pre- and post-maintenance procedures of process facilities

    International Nuclear Information System (INIS)

    Noroozi, Alireza; Khakzad, Nima; Khan, Faisal; MacKinnon, Scott; Abbassi, Rouzbeh

    2013-01-01

    Human factors play an important role in the safe operation of a facility. Human factors include the systematic application of information about human characteristics and behavior to increase the safety of a process system. A significant proportion of human errors occur during the maintenance phase. However, the quantification of human error probabilities in the maintenance phase has not been given the amount of attention it deserves. This paper focuses on a human factors analysis in pre-and post- pump maintenance operations. The procedures for removing process equipment from service (pre-maintenance) and returning the equipment to service (post-maintenance) are considered for possible failure scenarios. For each scenario, human error probability is calculated for each activity using the Success Likelihood Index Method (SLIM). Consequences are also assessed in this methodology. The risk assessment is conducted for each component and the overall risk is estimated by adding individual risks. The present study is aimed at highlighting the importance of considering human error in quantitative risk analyses. The developed methodology has been applied to a case study of an offshore process facility

  7. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  8. Industrial Maintenance Strategies

    International Nuclear Information System (INIS)

    Sajjad Akbar

    2006-01-01

    Industrial plants have become more complex due to technological advancement. This has made the task of maintenance more difficult. The maintenance costs in terms of resources and downtime loss are so high that maintenance function has become a critical factor in a plant's profitability. Industry should devote as much forethought to the management of maintenance function as to production. Maintenance has grown from an art to a precise, technical engineering science. Planning, organizing scheduling and control of maintenance using modern techniques pays dividends in the form of reduced costs and increased reliability. The magnitude and the dimension of maintenance have multiplied due to development in the engineering technologies. Production cost and capacities are directly affected by the breakdown time. Total operating cost including the maintenance cost plays an important role in replacement dimension. The integrated system approach would bring forth the desired results of high maintenance standards. The standards once achieved and sustained, would add to the reliability of the plan and relieve heavy stresses and strains on the engineering logistic support. (author)

  9. Risk-based Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Nielsen, Jannie Jessen

    2011-01-01

    For offshore wind turbines, costs to Operation and Maintenance (OM) are substantial, and can be expected to increase when wind farms are placed at deeper water depths and in more harsh environments. Traditional strategies for OM include corrective and preventive (scheduled and condition...... statistics and costs of the different operations. The different OM strategies are described and compared in an illustrative example with focus on which types of information that are needed. Special focus is on comparison between risk-based maintenance strategies and the conventional maintenance planning...... and are often the driving mechanisms for failures / faults that need maintenance. Observations of the degree of damage can increase the reliability of predictions and decrease the costs of OM if integrated in a risk-based framework theoretically based on pre-posterior Bayesian decision theory. The mathematical...

  10. A reliability program for emergency diesel generators at nuclear power plants: Maintenance, surveillance, and condition monitoring

    International Nuclear Information System (INIS)

    Lofgren, E.V.; Henderson, W.; Burghardt, D.; Kripps, L.; Rothleder, B.

    1988-12-01

    This report is a companion report on NUREG/CR-5078, Volume 1, ''A Reliability Program for Emergency Diesel Generators at Nuclear Power Plants: Program Structure.'' The purpose of this report is to provide technical findings and insights related to: failure evaluation, troubleshooting, maintenance, surveillance, and condition monitoring. Examples and recommendations are provided for each of these areas based on actual emergency diesel generator (EDG) operating experience and the opinions of diesel generator experts. This report expands the more general guidance provided in Volume 1. In addition, a discussion of EDG interactions with other plant systems (e.g., instrument, air, service water, dc power) is provided since experience has shown that these support systems and their operation can adversely affect EDG reliability. Portions of this report have been designed for use by onsite personnel for evaluating operational characteristics of EDGs. 5 refs., 8 figs., 7 tabs

  11. 8th International conference on CANDU maintenance. Conference proceedings

    International Nuclear Information System (INIS)

    2008-01-01

    The 8th International Conference on CANDU Maintenance was held in Toronto, Ontario, Canada on November 16-18, 2008. The theme of the conference was operational excellence: achieving competent, tightly-managed support services and was of interest to people working on the front lines of operations, maintenance and refurbishment. Equipment reliability is a critical factor in achieving safe and reliable Nuclear Power Plant operations for many reasons. For one it reduces the challenges upon the operating staff and allows station personnel to 'go on the offence' instead of having to play defense in a reactive mode. Plant reliability ensures that there is time to study the issues in detail and develop solutions for long-term success. Let us not forget that the owner carries the burden of demonstrating the return on investment, and plant reliability goes a long way in helping to make the case for plant life extension. A good reputation for plant reliability provides the public capital necessary to build confidence and facilitate the licensing process.

  12. ORNL Surplus Facilities Management Program maintenance and surveillance plan for fiscal year 1984

    International Nuclear Information System (INIS)

    Coobs, J.H.; Myrick, T.E.

    1986-10-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy's (DOE) National SFMP, administered by the Richland Operations Office. The purpose and objectives of the national program are set forth in the current SFMP Program Plan and include (1) the maintenance and surveillance of facilities awaiting decommissioning, (2) planning for the orderly decommissioning of these facilities, and (3) implementation of a program to accomplish the facility disposition in a safe, cost-effective, and timely manner. As outlined in the national program plan, participating SFMP contractors are required to prepare a formal plan that documents the maintenance and surveillance (M and S) programs established for each site. This report has been prepared to provide this documentation for those facilties included in the ORNL SFMP

  13. The operational challenge of remote maintenance

    International Nuclear Information System (INIS)

    Forsythe, L.

    2015-01-01

    Full text of publication follows. With the declining supply of fossil fuels that are used in power stations today, and the ongoing concern over climate change, nuclear fusion is one of the most promising options for generating large amounts of carbon-free energy in the future. Fuel supplies for fusion will be available for millions of years, with 1 kg of fusion fuel providing the same amount of energy as 10 thousand tonnes of fossil fuel. Unlike conventional fission reactors, the radioactive waste produced from fusion is short-lived, and will be safe to dispose of conventionally within 100 years. Although fusion has the huge advantage of being a carbon free energy source, there are complexities when it comes to maintaining the machine. Due to the nature of the fusion reaction, the components within the area of the reactor vacuum vessel become radioactive, which requires maintenance and modifications to be conducted remotely to protect human operators. Remote maintenance is the use of manipulators to carry out tasks in challenging or hostile environments, which would otherwise cause harm to humans. Remote handling slave manipulators do the work of a human by mimicking the movements from a master robotic manipulator that is controlled by a human operator. This means that remote handling can be used in many other areas other too, such as space; fission power plants; sub-sea; and nuclear material handling or in adverse environments such as: low or high temperature; chemically contaminated; combustible and low oxygen environments. Remote maintenance requires specialist engineers to take into consideration many aspects normally taken for granted when carrying out a task manually. Constraints such as the space around us; viewing and lighting; the human body's dexterity and flexibility; the weight and centre of gravity of tools and components, and how we securely grip and handle them; and access to fixings and fastenings. All these are factors that require careful

  14. Safe delivery practices: experience from cross-sectional data of Bangladeshi women.

    Science.gov (United States)

    Kabir, M A; Goh, Kim-Leng; Khan, M M H; Al-Amin, Abul Quasem; Azam, Mohammad Nurul

    2015-03-01

    This study examines the safe delivery practices of Bangladeshi women using data on 4905 ever-married women aged 15 to 49 years from the 2007 Bangladesh Demographic and Health Survey. Variables that included age, region of origin, education level of respondent and spouse, residence, working status, religion, involvement in NGOs, mass media exposure, and wealth index were analyzed to find correlates of safe delivery practices. More than 80% of the deliveries took place at home, and only 18% were under safe and hygienic conditions. The likelihood of safe deliveries was significantly lower among younger and older mothers than middle-aged mothers and higher among educated mothers and those living in urban areas. Economically better-off mothers and those with greater exposure to mass media had a significantly higher incidence of safe delivery practices. A significant association with religion and safe delivery practices was revealed. Demographic, socioeconomic, cultural, and programmatic factors that are strongly associated with safe delivery practices should be considered in the formulation of reproductive health policy. © 2012 APJPH.

  15. Effectiveness of the GAEC cross compliance standard Maintenance of olive groves in good vegetative condition in avoiding the deterioration of habitats and land abandonment

    Directory of Open Access Journals (Sweden)

    Elena Santilli

    2011-08-01

    Full Text Available The last CAP reform (Council Regulation (EC n. 1782/2003, coincided with the mandatory obligations of the principles of cross compliance, under which all compensatory payments given in the context of the former reform packages were replaced by a Single Payment Scheme (SPS, bound to fulfillment of certain requirements and minimum standards regarding the environment and animal welfare, as well as maintaining the land in good agricultural and environmental conditions. For the olive sector, where potential risks are mainly associated to the abandonment of groves in marginal areas with consequent negative environmental impact, it has been specifically established the standard 4.3 of the Good Agricultural and Environmental Conditions (GAEC which concerns the Maintenance of olive groves and vines in good vegetative conditions. This GAEC standard was formulated to ensure a minimum level of land maintenance and to avoid the deterioration of habitats. To achieve these objectives it should be considered that a good vegetative development is strictly related to the care of the soil in which the plants grow. Erosion, organic matter and soil structure decay are the most commonly identified impacts for olive orchards, 30% of which are localized in areas with difficult orographic conditions. In this sense, proper hydraulic and mechanical techniques, cover cropping, green manuring and timely pruning turns, are essential to minimize losses due to soil erosion, to limit the leaching of nutrients and to maintain the plant productivity. Furthermore, grinded pruning residues should be spread in situ and weeds, watersprouts and suckers should be periodically cut off in order to increase the atmospheric CO2 sequestration and soil organic matter (OM and to prevent wildfires risk and nutrients competition. The application of the standard 4.3 requires further investigations, because, while numerous studies have shown that pruning is essential for the production, there are

  16. Commercial experience with facility deactivation to safe storage

    Energy Technology Data Exchange (ETDEWEB)

    Sype, T.T. [Sandia National Labs., Albuquerque, NM (United States); Fischer, S.R. [Los Alamos National Lab., NM (United States); Lee, J.H. Jr.; Sanchez, L.C.; Ottinger, C.A.; Pirtle, G.J. [Sandia National Labs., Albuquerque, NM (United States)

    1995-09-01

    The Department of Energy (DOE) has shutdown many production reactors; the Department has begun a major effort to also shutdown a wide variety of other nuclear facilities. Because so many facilities are being closed, it is necessary to place many of them into a safe- storage status, i.e., deactivation, before conducting decommissioning- for perhaps as long as 20 years. The challenge is to achieve this safe-storage condition in a cost-effective manner while remaining in compliance with applicable regulations. The DOE Office of Environmental Management, Office of Transition and Management, commissioned a lessons-learned study of commercial experience with safe storage and decommissioning. Although the majority of the commercial experience has been with reactors, many of the lessons learned presented in this document can provide insight into transitioning challenges that Will be faced by the DOE weapons complex.

  17. Commercial experience with facility deactivation to safe storage

    International Nuclear Information System (INIS)

    Sype, T.T.; Fischer, S.R.; Lee, J.H. Jr.; Sanchez, L.C.; Ottinger, C.A.; Pirtle, G.J.

    1995-09-01

    The Department of Energy (DOE) has shutdown many production reactors; the Department has begun a major effort to also shutdown a wide variety of other nuclear facilities. Because so many facilities are being closed, it is necessary to place many of them into a safe- storage status, i.e., deactivation, before conducting decommissioning- for perhaps as long as 20 years. The challenge is to achieve this safe-storage condition in a cost-effective manner while remaining in compliance with applicable regulations. The DOE Office of Environmental Management, Office of Transition and Management, commissioned a lessons-learned study of commercial experience with safe storage and decommissioning. Although the majority of the commercial experience has been with reactors, many of the lessons learned presented in this document can provide insight into transitioning challenges that Will be faced by the DOE weapons complex

  18. 19 CFR 19.4 - CBP and proprietor responsibility and supervision over warehouses.

    Science.gov (United States)

    2010-04-01

    ... or their authorized agent. (4) Records maintenance—(i) Maintenance. The proprietor shall: (A... proprietor shall maintain the warehouse facility in a safe and sanitary condition and establish procedures... seals. (7) Storage conditions. Merchandise in the bonded area shall be stored in a safe and sanitary...

  19. Japanese maintenance centres strive for greater realism

    International Nuclear Information System (INIS)

    Nedderman, J.

    1987-01-01

    Japanese utilities have devoted considerable efforts to ensuring that realistic plant conditions are simulated at their maintenance centres. In some centres, eg that of Kansai Electric Power Co, realism extends to difficult access, limited lighting and restricted ventilation. (author)

  20. Optimization of the preventive maintenance plan of a series components system

    Energy Technology Data Exchange (ETDEWEB)

    Duarte, Jose A. Caldeira [Mathematical Department, Instituto Politecnico de Setubal/Escola Superior de Tecnologia de Setubal, Campus do IPS, Estefanilha, 2914-508 Setubal (Portugal)]. E-mail: jduarte@est.ips.pt; Craveiro, Joao C. Taborda A. [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal); Trigo, Tomas Pedro [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal)

    2006-04-15

    One of the most critical problems in preventive maintenance is the determination of the optimum frequency to perform preventive maintenance in equipment, in order to ensure its availability. In this paper, we propose an algorithm to solve the previous problem for equipment that exhibit linearly increasing hazard rate and constant repair rate. Based on this algorithm, we have developed another one to solve the problem of maintenance management of a series system based on preventive maintenance over the different system components. We assume that all components of the system still exhibit linearly increasing hazard rate and constant repair rate and that preventive maintenance would bring the system to the as good as new condition. We define a cost function for maintenance tasks (preventive and corrective) for the system. The algorithm calculates the interval of time between preventive maintenance actions for each component, minimizing the costs, and in such a way that the total downtime, in a certain period of time, does not exceed a predetermined value.

  1. Inspection, evaluation and maintenance guidelines for reactor vessel internals in JAPAN

    International Nuclear Information System (INIS)

    Sakashita, Akihiro; Goto, Tomoya; Hirano, Shinro; Dozaki, Koji

    2010-01-01

    Inspection and Evaluation Guidelines for reactor internals has been taken into the Rules on Fitness-for–Service for Nuclear Power Plants of The Japan Society of Mechanical Engineers. It is a base of the maintenance plan of each Nuclear Power Plant. A plant maintenance methodology will have more importance to maintain the plant safety and stable plant operation. This paper introduces the systematization of the maintenance such as repair, replacement, preventive maintenance in these guidelines. Maintenance methodologies are classified follows. Repair: methodology to reinforce degraded parts by some methods or prevent progress of degradation of without replacement of the existing structure when the degradation of structure is actualized. Replacement: methodology to replace the existing structure with new one when the degradation of structure is actualized. Preventive maintenance : methodology to mitigate the damaged condition. When the maintenance methodologies are implemented in the actual plant, we have to consider the feedback of the inspection program and plant life management. (author)

  2. Model-based fault diagnosis framework for effective predictive maintenance / B.B. Akindele

    OpenAIRE

    Akindele, Babatunde Babajide

    2010-01-01

    Predictive maintenance is a proactive maintenance strategy that is aimed at preventing the unexpected failure of equipment through condition monitoring of the health and performance of the equipment. Incessant equipment outage resulting in low availability of production facilities is a major issue in the Nigerian manufacturing environment. Improving equipment availability in Nigeria industry through institution of a full featured predictive maintenance has been suggested by many authors. T...

  3. Robustness evaluation of cutting tool maintenance planning for soft ground tunneling projects

    Directory of Open Access Journals (Sweden)

    Alena Conrads

    2018-03-01

    Full Text Available Tunnel boring machines require extensive maintenance and inspection effort to provide a high availability. The cutting tools of the cutting wheel must be changed timely upon reaching a critical condition. While one possible maintenance strategy is to change tools only when it is absolutely necessary, tools can also be changed preventively to avoid further damages. Such different maintenance strategies influence the maintenance duration and the overall project performance. However, determine downtime related to a particular maintenance strategy is still a challenging task. This paper shows an analysis of the robustness to achieve the planned project performance of a maintenance strategy considering uncertainties of wear behavior of the cutting tools. A simulation based analysis is presented, implementing an empirical wear prediction model. Different strategies of maintenance planning are compared by performing a parameter variation study including Monte-Carlo simulations. The maintenance costs are calculated and evaluated with respect to their robustness. Finally, an improved and robust maintenance strategy has been determined. Keywords: Mechanized tunneling, Maintenance, Wear of cutting tools, Process simulation, Robustness, Uncertainty modeling

  4. On maintenance management of wind and nuclear power plants

    International Nuclear Information System (INIS)

    Nilsson, Julia

    2009-11-01

    Electrical production in Sweden today is mainly from nuclear and hydro power. However, there is large increase in renewable energy like wind power and the installed new capacity goals are large. Several electrical production sources are important for the sustainability of the energy system. Maintenance is an approach for keeping a system sustainable. The importance of structured maintenance for reliable electrical production systems triggers the development of qualitative and quantitative maintenance management methods. Examples of these methods are Reliability-Centered Maintenance (RCM) which is a structured qualitative approach that focuses on reliability when planning maintenance, and Reliability Centered Asset Management (RCAM) which is a development of RCM into a quantitative approach with the aim to relate preventive maintenance to total maintenance cost and system reliability. This thesis presents models, as applications of RCAM, based on the methods of Life Cycle Cost (LCC) and mathematical optimization, applied to wind and nuclear power plants. Both deterministic and stochastic approaches have been used and the proposed models are based on the Total Cost model, which summarizes costs for maintenance and production loss, and the Aircraft model, which is an opportunistic maintenance optimization model. Opportunistic maintenance is preventive maintenance performed at opportunities. The wind power applications in this study show on different ways to cover costs of condition monitoring systems (CMS) and further on economic benefits of these when uncertainties of times to failure are included in the model. The nuclear power applications show on that the optimization model is dependent on the discount rate and that a high discount rate gives more motivation for opportunistic replacements. When put into a stochastic framework and compared to other maintenance strategies it is shown that an extended opportunistic maintenance optimization model has a good overall

  5. "Same Room, Safe Place".

    Science.gov (United States)

    Keene Woods, Nikki

    2017-04-01

    There are many different professional stances on safe sleep and then there is the reality of caring for a newborn. There is a debate among professionals regarding safe sleep recommendations. The continum of recommendations vary from the American Academy of Pediatrics (AAP) Safe Sleep Guidelines to the bed-sharing recommendations from the Mother-Baby Behavioral Sleep Laboratory. The lack of consistent and uniform safe sleep recommendations from health professionals has been confusing for families but has more recently raised a real professional ethical dilemma. Despite years of focused safe sleep community education and interventions, sleep-related infant deaths are on the rise in many communities. This commentary calls for a united safe sleep message from all health professionals to improve health for mothers and infants most at-risk, "Same Room, Safe Place."

  6. Manipulator techniques and problems of their application in primary circuit maintenance

    International Nuclear Information System (INIS)

    Kertscher, F.; Popp, P.

    1985-01-01

    The fundamental structure and specifications of manipulators (in particular of industrial robots) are presented in order to derive the application conditions and fields for manipulators in primary circuit maintenance. The necessity of applying process-specific manipulator technique in the primary circuit maintenance is based on nuclear safety requirements and on decreasing of the radiation exposure of maintenance personnel. Synchronous manipulators and industrial robots are the types of manipulators used in materials testing, repairing and scrapping. The technical requirements of manipulators are discussed

  7. Social safeness and disordered eating: Exploring underlying mechanisms of body appreciation and inflexible eating.

    Science.gov (United States)

    Pinto, Catarina; Ferreira, Cláudia; Mendes, Ana Laura; Trindade, Inês A

    2017-06-01

    Feelings of social safeness and connectedness have been associated with adaptive emotion regulation processes and well-being indicators. Further, literature has demonstrated that interpersonal experiences play an important role in the etiology and maintenance of body and eating psychopathology. However, the study of the role of social variables and emotion regulation processes in the engagement in inflexible eating rules and eating psychopathology is still in its early stages. The current study aims to fill some gaps within the literature and explore the mediator role of body appreciation and inflexible eating rules in the link between social safeness and disordered eating. Participants were 253 women, aged between 18 and 50 years old, who completed a series of online self-report measures. Results from the tested path analysis model showed that social safeness holds a significant effect on eating psychopathology, through the mechanisms of body appreciation and inflexible eating rules. Also, results suggested that women who present higher levels of social safeness tend to present a more positive and respectful attitude towards their body and decreased adoption of inflexible eating rules, which seem to explain lower levels of disordered eating behaviours. These findings seem to present empirical support for the development of intervention programs that promote a positive, affectionate and healthy relationship with one's body image, in order to prevent the inflexible adherence to eating rules and disordered eating behaviours.

  8. Maintenance and control of apparatus for radiotherapy

    International Nuclear Information System (INIS)

    Wakui, Sho

    1979-01-01

    In order to perform the safe operation of radiotherapy apparatuses and to secure the accuracy in positioning patients and in setting up radiation beam, proper checking-up and maintenance schedule is necessary. Such schedule is described briefly and also the mechanical or electrical equipments designed for securing the safety and accuracy or eliminating in adequate operation are explained, especially on treatment tables and accessories, such as wedge filters, irradiation field indicators and pointers, and the devices for observing patients. The structures and the practical control of the following equipments are explained; standard treatment table, treatment table with a lifting column by oil pressure, mobile positioning control pedestal, positioning control pendaut, mechanical fuse cutter for the safeguard of table height movement, safety interlock to protect table from physical contact with radiation head in rotation and safeguard for arms of a patient in longitudinal movement of treatment table. For the maintenance and control of wedge filters, the kind of filter angle in use, the direction of filter in use and whether filter is used or not are exactly confirmed by adequate display. The direction mechanism of radiation field and the pointers are required to be strict for exact focusing of radiation. Various control apparatuses and monitoring apparatuses are described. (Kobatake, H.)

  9. Perencanaan Kegiatan Maintenance Dengan Metode Reability Centered Maintenance (Rcm) II

    OpenAIRE

    Rachmad Hidayat; Nachnul Ansori; Ali Imron

    2010-01-01

    Maintenance Activity Planning by Reability Centered Maintenance (RCM) II Method. This research discussmaintenance activity by using RCM II method to determine failure function risk at compresor screw. Calculation isgiven to magnitude optimum time maintenance interval by considering the cost maintenance and the cost reparation.From the research results with RPN points out that critical component that needs to get main priority in givemaintenance on compresor screw are bust logistic on timeworn...

  10. Online condition monitoring to enable extended operation of nuclear power plants

    International Nuclear Information System (INIS)

    Meyer, Ryan Michael; Bond, Leonard John; Ramuhalli, Pradeep

    2012-01-01

    Safe, secure, and economic operation of nuclear power plants will remain of strategic significance. New and improved monitoring will likely have increased significance in the post-Fukushima world. Prior to Fukushima, many activities were already underway globally to facilitate operation of nuclear power plants beyond their initial licensing periods. Decisions to shut down a nuclear power plant are mostly driven by economic considerations. Online condition monitoring is a means to improve both the safety and economics of extending the operating lifetimes of nuclear power plants, enabling adoption of proactive aging management. With regard to active components (e.g., pumps, valves, motors, etc.), significant experience in other industries has been leveraged to build the science base to support adoption of online condition-based maintenance and proactive aging management in the nuclear industry. Many of the research needs are associated with enabling proactive management of aging in passive components (e.g., pipes, vessels, cables, containment structures, etc.). This paper provides an overview of online condition monitoring for the nuclear power industry with an emphasis on passive components. Following the overview, several technology/knowledge gaps are identified, which require addressing to facilitate widespread online condition monitoring of passive components. (author)

  11. Plant life management and maintenance technologies for nuclear power plants

    International Nuclear Information System (INIS)

    Ikegami, Tsukasa; Aoki, Masataka; Shimura, Takao; Kaimori, Kimihiro; Koike, Masahiro

    2001-01-01

    Nuclear power generation occupying an important position for energy source in Japan and supplying about one third of total electric power usage is now required for further upgrading of its economics under regulation relaxation of electric power business. And, under execution retardation of its new planning plant, it becomes important to operate the already established plants for longer term and to secure their stability. Therefore, technical development in response to the plant life elongation is promoted under cooperation of the Ministry of Economics and Industries, electric power companies, literate, and plant manufacturers. Under such conditions, the Hitachi, Ltd. has progressed some technical developments on check inspection, repairs and maintenance for succession of the already established nuclear power plants for longer term under securing of their safety and reliability. And in future, by proposing the check inspection and maintenance program combined with these technologies, it is planned to exert promotion of maintenance program with minimum total cost from a viewpoint of its plant life. Here were described on technologies exerted in the Hitachi, Ltd. such as construction of plant maintenance program in response to plant life elongation agreeing with actual condition of each plant, yearly change mechanism grasping, life evaluation on instruments and materials necessary for maintenance, adequate check inspection, repairs and exchange, and so forth. (G.K.)

  12. Risk-Based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2010-01-01

    Operation and maintenance (O&M) are large contributors to the cost of energy for offshore wind turbines. Optimal planning of O&M should include use of inspections and monitoring results to make decisions that minimize the expected costs through the lifetime of the structures. For offshore...... structures it is especially important because of the dependence on weather windows for inspections and repairs to be possible. A model has been developed to estimate the expected costs to corrective and condition based maintenance for a wind turbine with a single component. The deterioration of the component...... is simulated, and the expected costs are found for different strategies. An application example shows that condition based maintenance has the potential of reducing the costs, and a risk based approach can be used to find the optimal strategy for O&M. Further the influence of failure rate and damage parameters...

  13. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2017-10-01

    Full Text Available Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despite the wide diffusion of lean maintenance, there is no structured method that supports the prescription of lean tools applied to the maintenance function. This paper presents the experience gathered in two lean maintenance projects in thermoelectric power plants. The application of lean techniques was based on using a previously developed multicriterial decision making process that uses the Fuzzy Analytic Hierarchy Process (AHP methodology to carry out a diagnosis and prescription tasks. That methodology allowed the prescription of the appropriated lean techniques to resolve the main deficiencies in maintenance function. The results of applying such lean tools show that important results can be obtained, making the maintenance function in thermoelectric power plants more efficient and lean.

  14. Artificial Intelligent Platform as Decision Tool for Asset Management, Operations and Maintenance.

    Science.gov (United States)

    2018-01-04

    An Artificial Intelligence (AI) system has been developed and implemented for water, wastewater and reuse plants to improve management of sensors, short and long term maintenance plans, asset and investment management plans. It is based on an integrated approach to capture data from different computer systems and files. It adds a layer of intelligence to the data. It serves as a repository of key current and future operations and maintenance conditions that a plant needs have knowledge of. With this information, it is able to simulate the configuration of processes and assets for those conditions to improve or optimize operations, maintenance and asset management, using the IViewOps (Intelligent View of Operations) model. Based on the optimization through model runs, it is able to create output files that can feed data to other systems and inform the staff regarding optimal solutions to the conditions experienced or anticipated in the future.

  15. Importance of safety review to the safe operation of a nuclear plant

    International Nuclear Information System (INIS)

    Brinkerhoff, L.C.

    1978-01-01

    Widely differing standards of construction of nuclear reactors are employed in different countries. Although the reactor vendors, including designers and construction contractors, have a vested interest in safety, the ultimate responsibility for safety rests with the reactor facility operator. Even though governmental agencies, either directly or indirectly, must take a strong lead in developing policies and practices of safe operation, the reactor facility operator must recognize and accept the full responsibility for safe operation of the facility. The policies and practices of safe operation imposed by governmental agencies must help assure the prudent operation and the adequate maintenance of those structures, systems, and components of importance to safety. Since each country has a slightly different philosophy for achieving safety and each vendor utilizes different structures, systems, and components to fulfil this philosophy, it is imperative that the facility operator adequately maintain those engineered safety features and those plant protective systems which have been engineered into achieving the desired levels of safety. An additional method of helping to assure that those structures, systems, and components of importance to safety are prudently operated and adequately maintained is to assign the full safety responsibility for the overall operations of the reactor facility to the operating organization, i.e. assigning a 'line of responsibility' within the reactor facility operator. This assurance can be further strengthened by requiring that the facility operator establish a safety review body that overviews the operation and assures that the operating organization complies with those policies and practices of safe operation which have been imposed on the reactor facility. (author)

  16. Keeping you safe by making machine tools safe

    CERN Multimedia

    2012-01-01

    CERN’s third safety objective for 2012 concerns the safety of equipment - and machine tools in particular.   There are three prerequisites for ensuring that a machine tool can be used safely: ·      the machine tool must comply with Directive 2009/104/EC, ·      the layout of the workshop must be compliant, and ·      everyone who uses the machine tool must be trained. Provided these conditions are met, the workshop head can grant authorisation to use the machine tool. To fulfil this objective, an inventory of the machine tools must be drawn up and the people responsible for them identified. The HSE Unit's Safety Inspection Service produces compliance reports for the machine tools. In order to meet the third objective set by the Director-General, the section has doubled its capacity to carry out inspections: ...

  17. Software development and maintenance: An approach for a large accelerator control system

    International Nuclear Information System (INIS)

    Casalegno, L.; Orsini, L.; Sicard, C.H.

    1990-01-01

    Maintenance costs presently form a large part of the total life-cycle cost of a software system. In case of large systems, while the costs of eliminating bugs, fixing analysis and design errors and introducing updates must be taken into account, the coherence of the system as a whole must be maintained while its parts are evolving independently. The need to devise and supply tools to aid programmers in housekeeping and updating has been strongly felt in the case of the LEP preinjector control system. A set of utilities has been implemented to create a safe interface between the programmers and the files containing the control software. Through this interface consistent naming schemes, common compiling and object-building procedures can be enforced, so that development and maintenance staff need not be concerned with the details of executable code generation. Procedures have been built to verify the consistency, generate maintenance diagnostics and automatically update object and executable files, taking into account multiple releases and versions. The tools and the techniques reported in this paper are of general use in the UNIX environment and have already been adopted for other projects. (orig.)

  18. Critical Design Factors for Sector Transport Maintenance in DEMO

    Energy Technology Data Exchange (ETDEWEB)

    Utoh, H.; Someya, Y.; Tobita, K.; Asakura, N.; Hoshino, K.; Nakamura, M., E-mail: uto.hiroyasu@jaea.go.jp [Japan Atomic Energy Agency, Rokkasho (Japan)

    2012-09-15

    Full text: Maintenance is a critical issue for fusion DEMO reactor because the design conditions and requirements of DEMO maintenance scheme are different from that of ITER remote handling. The sector transport maintenance scheme has advantages to maintain blankets and divertors without the use of sophisticated remote handling devices including sensitive devices to radiation in the reactor. SlimCS designed in JAEA adopts the sector transport maintenance scheme in which every sector is pulled out horizontally through a port between TF coils. A critical design issue for the horizontal sector transport maintenance scheme is how to support an enormous turnover force of the toroidal field (TF) coils. We propose following two options; first option is the horizontal transport maintenance scheme in which every sector is pulled out through four horizontal ports connected with the corridor. Second option is the vertical sector transport maintenance scheme with small vertical maintenance ports (total: 6 ports). The new horizontal sector transport limited in the number of maintenance ports is a more realistic maintenance scheme, and the key engineering issue is the transferring mechanism of sector in the vacuum vessel. In the maintenance scenario, the key design factors are the cool down time in reactor and the cooling method in maintenance scheme for keeping components under operation temperature. By one-dimensional heat conduction analysis, the sector should be transported to hot cell within 40 hours in the case the cool down time is one month. In the horizontal sector transport maintenance, the maintenance time including removal of cooling piping, drain of cooling water and sector transport to hot cell is about 32 hours. Furthermore, the tritium release in the sector transport can be suppressed because the components temperature drops by forced-air cooling system. This paper mainly focuses on a sector transport maintenance scheme from the aspects of high plant availability

  19. The method for assurance to operational safety of cryogenics equipment through definite maintenance

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2004-01-01

    The present paper reports about a method of ensuring operational safety of cryogenics equipment through specific maintenance measures which imply a definite concept of maintainability and operational reliability, methods of maintenance, necessary logistic and necessary personnel. The stages of the concept should succeed in a logical order and must be based on detailed analyses of the process of maintenance. The method starts from the operation conditions of cryogenic equipment in nuclear regime. Thus maintenance policy must be well defined within the boundaries of the nuclear plant through definition of coherent objectives and responsibility delegation for the personnel implied in maintenance activity. This method ensures performance in maintenance and an efficient feedback from equipment analysis. (author)

  20. Cost Analysis of Maintenance Programs for Pre-Positioned War Reserve Material Stock (PWRMS)

    National Research Council Canada - National Science Library

    Cyr, Phillip

    2002-01-01

    ...) for that maintenance. The objective is to provide DoD, the Navy, and the Civil Engineer Corps a guideline and possible benchmark for maintenance costs required to maintain the CESE War Reserves in a Cl condition of readiness...

  1. Gym-based exercise and home-based exercise with telephone support have similar outcomes when used as maintenance programs in adults with chronic health conditions: a randomised trial

    Directory of Open Access Journals (Sweden)

    Paul Jansons

    2017-07-01

    Trial registration: ACTRN12610001035011. [Jansons P, Robins L, O’Brien L, Haines T (2017 Gym-based exercise and home-based exercise with telephone support have similar outcomes when used as maintenance programs in adults with chronic health conditions: a randomised trial. Journal of Physiotherapy 63: 154–160

  2. ECONOMIC EFFICIENCY OF VARIOUS QUEEN BEES MAINTENANCE SYSTEMS

    Directory of Open Access Journals (Sweden)

    A POPESCU

    2003-10-01

    Full Text Available The modern queens maintenance systems are based on the use of artificial insemination, queens’ maintenance in the so called „queens bank” , in this way assuring an increased economic efficiency in beekeeping. This study aimed to compare the economic efficiency of the implementation of A.I. to various queen bees maintenance systems. Three alternatives have been taken into account: V1-a queen bee in a cage together with her bees, V2- a queen bank system and V3 – a queen bee in a nucleus. For each queen bee maintenance alternative have been evaluated the most important indicators such as: expenses, incomes, profit, number of marketable inseminated and selected queen bees, honey production, cost/queen, revenue/queen, profit/queen, profit rate. The most effective alternative was the queen bank system assuring 2,400 marketable queen bees and 20 kg honey delivered yearly, USD 12,442 incomes, USD 3,400 expenses, USD 9,042 profit, that is USD 3.77/queen bee and 265.72 % profit rate under the condition as A.I. costs are just USD 1,058, representing 31.1 % of total queen bees maintenance costs.

  3. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  4. Activities for turbine maintenance: planning, implementation and evaluation of inspection results

    International Nuclear Information System (INIS)

    Azcue, J.; Sanchez, M. A.; Alvaro, M.

    2014-01-01

    The article will cover the most significant aspects of how Tecnatom carry out the turbine maintenance work, both from the point of view of the inspection itself as the pre-and post tasks associated. Thus, the issues that will be part of the article are the Manual Inspection Service (MISI) and the inspection database, ISI WEB. These tools are essential for planning field work and serve as a guide to run later turbine inspections in different plants. Following this introduction the inspection teams and the techniques used by Tecnatom will be described. finally, the article will contain a small mention about management studies of life and integrity analysis of the turbine that can be performed, as well as involvement in its safe operation that is derived from them. Ultimately, the intention is to provide a comprehensive approach to the issue in question, the turbine maintenance work, so that the reader can get an ideal of the whole process. (Author)

  5. L'externalisation de la maintenance

    CERN Document Server

    Véret, Daniele

    2003-01-01

    La maintenance évolue ! De plus en plus d'entreprises externalisent tout ou partie des tâches ou fonctions de la maintenance à des prestataires. Dans ces conditions, une relation d confiance doit s'établir entre le donneur d'ordres et le prestataire, qui se traduira par un contrat respectant les intérêts de chacun. L'externalisation de la maintenance apporte les réponses à toutes les questions qui se posent lors de l'élaboration du cahier des charges et de la phase précontractuelle, afin de bien préciser les exigences à satisfaire. Vous trouverez les réponses à toutes vos questions et même à celles auxquelles vous n'aviez pas pensé ! - Jusqu'où va la notion d'externalisation ? - Quels sont les risques d'une mauvaise définition de la phase précontractuelle ? - Quels modes de relation contractuelle peut-on rencontrer ? - En quoi consistent les astreintes ? - Qu'est-ce que la sous-traitante ? - Qu'est-ce qu'un cahier des charges ? - Quelles sont les relations entre le donneur d'ordres et le p...

  6. Sensitivity of Risk-Based Maintenance Planning of Offshore Wind Turbine Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    2017-01-01

    Inspection and maintenance expenses cover a considerable part of the cost of energy from offshore wind turbines. Risk-based maintenance planning approaches are a powerful tool to optimize maintenance and inspection actions and decrease the total maintenance expenses. Risk-based planning is based...... on many input parameters, which are in reality often not completely known. This paper will assess the cost impact of this incomplete knowledge based on a case study following risk-based maintenance planning. The sensitivity study focuses on weather forecast uncertainties, incomplete knowledge about...... the needed repair time on the site as well as uncertainties about the operational range of the boat and helicopter used to access the broken wind turbine. The cost saving potential is estimated by running Crude Monte Carlo simulations. Furthermore, corrective and preventive (scheduled and condition...

  7. Selection of appropriate conditioning matrices for the safe disposal of radioactive waste

    International Nuclear Information System (INIS)

    Vance, E.R.

    2002-01-01

    The selection of appropriate solid conditioning matrices or wasteforms for the safe disposal of radioactive waste is dictated by many factors. The overriding issue is that the matrix incorporating the radionuclides, together with a set of engineered barriers in a near-surface or deep geological repository, should prevent significant groundwater transport of radionuclides to the biosphere. For high-level waste (HLW) from nuclear fuel reprocessing, the favored matrices are glasses, ceramics and glass-ceramics. Borosilicate glasses are presently being used in some countries, but there are strong scientific arguments why ceramics based on assemblages of natural minerals are advantageous for HLW. Much research has been carried out in the last 40 years around the world, and different matrices are more suitable than others for a given waste composition. However a major stumbling block for HLW immobilisation is the mall number of approved geological repositories for such matrices. The most appropriate matrices for Intermediate and low-level wastes are contentious and the selection criteria are not very well defined. The candidate matrices for these latter wastes are cements, bitumen, geopolymers, glasses, glass-ceramics and ceramics. After discussing the pros and cons of various candidate matrices for given kinds of radioactive wastes, the SYNROC research program at ANSTO will be briefly surveyed. Some of the potential applications of this work using a variety of SYNROC derivatives will be given. Finally the basic research program at ANSTO on radioactive waste immobilisation will be summarised. This comprises mainly work on solid state chemistry to understand ionic valences and co-ordinations for the chemical design of wasteforms, aqueous durability to study the pH and temperature dependence of solid-water reactions, radiation damage effects on structure and solid-water reactions. (Author)

  8. Conditional live virus as a novel approach towards a safe live attenuated HIV vaccine

    NARCIS (Netherlands)

    Das, Atze T.; Zhou, Xue; Vink, Monique; Klaver, Bep; Berkhout, Ben

    2002-01-01

    To control the worldwide spread of HIV, a safe and effective prophylactic vaccine is urgently needed. Studies with the simian immunodeficiency virus demonstrated that a live attenuated virus can be effective as a vaccine, but serious concerns about the safety of such a vaccine virus have arisen. We

  9. Reliable JavaScript how to code safely in the world's most dangerous language

    CERN Document Server

    Spencer, Lawrence

    2015-01-01

    Create more robust applications with a test-first approach to JavaScript Reliable JavaScript, How to Code Safely in the World's Most Dangerous Language demonstrates how to create test-driven development for large-scale JavaScript applications that will stand the test of time and stay accurate through long-term use and maintenance. Taking a test-first approach to software architecture, this book walks you through several patterns and practices and explains what they are supposed to do by having you write unit tests. Write the code to pass the unit tests, so you not only develop your technique

  10. Maintenance Management Update.

    Science.gov (United States)

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  11. Research of Monte Carlo method used in simulation of different maintenance processes

    International Nuclear Information System (INIS)

    Zhao Siqiao; Liu Jingquan

    2011-01-01

    The paper introduces two kinds of Monte Carlo methods used in equipment life process simulation under the least maintenance: condition: method of producing the interval of lifetime, method of time scale conversion. The paper also analyzes the characteristics and the using scope of the two methods. By using the conception of service age reduction factor, the model of equipment's life process under incomplete maintenance condition is established, and also the life process simulation method applicable to this situation is invented. (authors)

  12. Scheduling the maintenance of gaseous diffusion and electric power distribution plants

    International Nuclear Information System (INIS)

    Chauvet, D.

    1990-01-01

    A computer aided scheduling applied to the maintenance of a uranium enrichment plant is presented. The plant exploits gaseous diffusion and electric power distribution plants, for which the operating conditions must be satisfied. The management and the execution of the maintenance actions are computer aided. Concerning the techniques, the cost, the safety and the scheduling actions were optimized [fr

  13. How did aviation become so safe, and beyond?

    NARCIS (Netherlands)

    Stoop, J.A.A.M.

    2017-01-01

    Aviation has been recognized as one of the ultimate safe socio-technical systems. This contribution discusses the conditions and context that moulded the system safety to its present level by applying integral safety, a sectoral approach and safety as a strategic value. At present the aviation

  14. Development of an intellectual maintenance management system. Development of trouble detection and troubleshooting evaluation system

    International Nuclear Information System (INIS)

    Suda, Kazunori; Yoshikawa, Shinji; Tani, Satoshi

    1998-03-01

    Many research activities are conducted to enhance cost performance and safety of nuclear power plants operation and maintenance. Concept of autonomous operating system to equal the role of operators and of maintenance personnel with artificial intelligence and autonomous robots has been developed. An intellectual maintenance management system has been developed to be equipped with decision making functions of maintenance personnel. The intellectual maintenance management system is in charge of maintenance function of an autonomous plant, which consists of plant-wide monitoring, evaluation of component integrity, and scheduling of maintenance activities. In other words, this system should be equipped with preventive maintenance and corrective maintenance functions those are currently loaded on personnel. In this report, we discussed condition monitoring maintenance in the preventive maintenance. We also reported a sensor validation system development for machinery condition monitoring and diagnosis. We adopted distributed and cooperative system construction technique, which is expected recently in applications to large-scale plants. This system has inter-agent communication function for signal transmission and reception among distributed physics models of machineries. The system has been constructed for water/steam system of the LMFBR power plant. The system has been validated to be capable of cooperative sensor validation by the distributed set of agents, with quantitative indication of sensor deviation based on a newly developed fuzzy algorithm with inter-agent cooperation. The derived reference parameter value from the inter-agent evaluations also stands for the alternative measurement to the malfunctioned sensor. (author)

  15. DroidSafe

    Science.gov (United States)

    2016-12-01

    Massachusetts Avenue, Build E19-750 Cambridge , MA 02139-4307 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS...Activity objects illustrating the challenges of points-to and information flow analysis...measure how many malicious flows Droid- Safe was able to detect). As these results illustrate , DroidSafe implements an analysis of unprece- dented

  16. Fail-safe computer-based plant protection systems

    International Nuclear Information System (INIS)

    Keats, A.B.

    1983-01-01

    A fail-safe mode of operation for computers used in nuclear reactor protection systems was first evolved in the UK for application to a sodium cooled fast reactor. The fail-safe properties of both the hardware and the software were achieved by permanently connecting test signals to some of the multiplexed inputs. This results in an unambiguous data pattern, each time the inputs are sequentially scanned by the multiplexer. The ''test inputs'' simulate transient excursions beyond defined safe limits. The alternating response of the trip algorithms to the ''out-of-limits'' test signals and the normal plant measurements is recognised by hardwired pattern recognition logic external to the computer system. For more general application to plant protection systems, a ''Test Signal Generator'' (TSG) is used to compute and generate test signals derived from prevailing operational conditions. The TSG, from its knowledge of the sensitivity of the trip algorithm to each of the input variables, generates a ''test disturbance'' which is superimposed upon each variable in turn, to simulate a transient excursion beyond the safe limits. The ''tripped'' status yielded by the trip algorithm when using data from a ''disturbed'' input forms part of a pattern determined by the order in which the disturbances are applied to the multiplexer inputs. The data pattern formed by the interleaved test disturbances is again recognised by logic external to the protection system's computers. This fail-safe mode of operation of computer-based protection systems provides a powerful defence against common-mode failure. It also reduces the importance of software verification in the licensing procedure. (author)

  17. Maintenance, repair and operation (MRO) of shutdown facilities

    International Nuclear Information System (INIS)

    Kenny, S.

    2006-01-01

    What level of maintenance does one apply to a shutdown facility? Well it depends on who you ask. Operations staff sees facilities that have completed their useful life cycle as a cost drain while Decommissioning staff sees this as the start of a new life cycle. Based on the decommissioning plan for the particular facility the building could complete another full life cycle while under decommissioning whether it is in storage with surveillance mode or under active decommissioning. This paper will explore how you maintain a facility and systems for many years after its useful life until final decommissioning is completed. When a building is declared redundant, who looks after it until the final decommissioning end state is achieved? At the AECL, Chalk River Labs site the safe shutdown and turnover process is one key element that initiates the decommissioning process. The real trick is orchestrating maintenance, repair and operation plans for a facility that has been poorly invested in during its last years of useful life cycle. To add to that usually shutdowns are prolonged for many years beyond the expected turnover period. During this presentation I will cover what AECL is doing to ensure that the facilities are maintained in a proper state until final decommissioning can be completed. All facilities or systems travel through the same life cycle, design, construction, commissioning, operation, shutdown and demolition. As we all know, nuclear facilities add one more interesting twist to this life cycle called Decommissioning that lands between shutdown and demolition. As a facility nears the shutdown phase, operations staff loose interest in the facility and stop investing in upgrades, repairs and maintenance but continue to invest and focus on maximizing operations. Facility maintenance standards produced by the International Facility Maintenance Association (IFMA) based on a survey done every year state that 2.2% of the total operating costs for the site should be

  18. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    Science.gov (United States)

    Milana; Khan, M. K.; Munive, J. E.

    2014-07-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective.

  19. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    International Nuclear Information System (INIS)

    Milana; Khan, M K; Munive, J E

    2014-01-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective

  20. From reliability to maintenance of emergency generator sets in nuclear plants

    International Nuclear Information System (INIS)

    Reyraud, Y.

    1986-01-01

    The particular conditions of operation of emergency generator sets in a nuclear energy plant induce to take up a strategy of supervision and of maintenance very different of the one recommended for production generator sets. Mechanical and thermal pulls are affected by the size of the set and the choice of rotation running in respect of the wanted power and the response time requirements for the security of nuclear reactor. Reliability studies are helpful to define the strategy of supervision tests. The importance of the number of starts with respect to the running time requires the introduction of the idea of equivalent hours for the definition of maintenance periods. The security of the equipment and the upholding of the reliability at a value close to the optimum impose rigorous choices and strict conditions of supervision and maintenance [fr

  1. Mechanical Intervention for Maintenance of Cartilage and Bone

    Directory of Open Access Journals (Sweden)

    Hui B. Sun

    2011-01-01

    Full Text Available Mechanical loading provides indispensible stimuli for growth and development of the articular cartilage and bone. Interestingly, depending on loading conditions loads applied to the joint can be beneficial as well as harmful to skeletal maintenance and remodeling. Moderate loads to the synovial joint, for instance, suppress the expression levels of matrix metallproteinases (MMPs, while loads above a threshold tend to increase their destructive activities. This report focuses on two recently developed loading modalities from animal studies, joint motion and joint loading. Their unique characteristics and potential usages for maintenance of the articular cartilage and stimulation of bone remodeling are reviewed. Also described are biophysical and molecular mechanisms which likely are responsible for the load-driven maintenance of cartilage and bone, and a possibility of developing load-mediated treatments of osteoporosis and osteoarthritis.

  2. Maintenance, outages and chemistry really can be compatible

    International Nuclear Information System (INIS)

    Roberts, J.G.; Deaconescu, R.

    2006-01-01

    'Full text:' In their address to the Canadian Nuclear Society, Bruce Power's Chemistry Design staff will describe how maintenance and outages can impact negatively on chemistry control and asset protection. Considerations of material impacts and material condition have significant influences on the approach to, and control of, chemistry. This applies equally to operation as it does during unit and/or system outages. Ideas will be presented as to how to facilitate making maintenance, outages and chemistry compatible. It will be shown how the lack of such an approach can lead to disastrous results. (author)

  3. Flexibility configurations and preventive maintenance impact on job-shop manufacturing systems

    Directory of Open Access Journals (Sweden)

    Paolo Renna

    2017-03-01

    Full Text Available Manufacturing systems need to be able to work under the dynamic and uncertain production environment. Machine and routing flexibility combined with preventive maintenance actions can improve the performance of the manufacturing systems under dynamic conditions. This paper evaluates different levels of machine and routing flexibility combined with different degrees of preventive maintenance policy. The performance measures considered are throughput, work in process and throughput. The performance measures are compared with a system without any flexibility and no preventive maintenance actions. Different levels of flexibility and preventive maintenance actions are examined under a simulation environment. The simulation results highlight more important factors for the performance measures and the best combination of the factors to improve the performance.

  4. Degradation mode analysis: An approach to establish effective predictive maintenance tasks

    International Nuclear Information System (INIS)

    Sonnett, D.E.; Douglass, P.T.; Barnard, D.D.

    1991-01-01

    A significant number of nuclear generating stations have been employing Reliability Centered Maintenance methodology to arrive at applicable and effective maintenance tasks for their plant equipment. The resultant endpoint of most programs has been an increased emphasis on predictive maintenance as the task of choice for monitoring and trending plant equipment condition to address failure mechanisms of the analyses. Many of these plants have spent several years conducting reliability centered analysis before they seriously begin implementing predictive program improvements. In this paper we present another methodology, entitled Degradation Mode Analysis, which provides a more direct method to quickly and economically achieve the major benefit of reliability centered analysis, namely predictive maintenance. (author)

  5. Application of the Delphi technique in healthcare maintenance.

    Science.gov (United States)

    Njuangang, Stanley; Liyanage, Champika; Akintoye, Akintola

    2017-10-09

    Purpose The purpose of this paper is to examine the research design, issues and considerations in the application of the Delphi technique to identify, refine and rate the critical success factors and performance measures in maintenance-associated infections. Design/methodology/approach In-depth literature review through the application of open and axial coding were applied to formulate the interview and research questions. These were used to conduct an exploratory case study of two healthcare maintenance managers, randomly selected from two National Health Service Foundation Trusts in England. The results of exploratory case study provided the rationale for the application of the Delphi technique in this research. The different processes in the application of the Delphi technique in healthcare research are examined thoroughly. Findings This research demonstrates the need to apply and integrate different research methods to enhance the validity of the Delphi technique. The rationale for the application of the Delphi technique in this research is because some healthcare maintenance managers lack knowledge about basic infection control (IC) principles to make hospitals safe for patient care. The result of first round of the Delphi exercise is a useful contribution in its own rights. It identified a number of salient issues and differences in the opinions of the Delphi participants, noticeably between healthcare maintenance managers and members of the infection control team. It also resulted in useful suggestions and comments to improve the quality and presentation of the second- and third-round Delphi instruments. Practical implications This research provides a research methodology that can be adopted by researchers investigating new and emerging issues in the healthcare sector. As this research demonstrates, the Delphi technique is relevant in soliciting expert knowledge and opinion to identify performance measures to control maintenance-associated infections in

  6. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  7. Safe havens in Europe

    DEFF Research Database (Denmark)

    Paldam, Martin

    2013-01-01

    Eleven safe havens exist in Europe providing offshore banking and low taxes. Ten of these states are very small while Switzerland is moderately small. All 11 countries are richer than their large neighbors. It is shown that causality is from small to safe haven to wealth, and that theoretically...... equilibriums are likely to exist where a certain regulation is substantially lower in a small country than in its big neighbor. This generates a large capital inflow to the safe havens. The pool of funds that may reach the safe havens is shown to be huge. It is far in excess of the absorptive capacity...... of the safe havens, but it still explains, why they are rich. Microstates offer a veil of anonymity to funds passing through, and Switzerland offers safe storage of funds....

  8. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  9. Traveling Safely with Medicines

    Science.gov (United States)

    ... Medications Safely My Medicine List How to Administer Traveling Safely with Medicines Planes, trains, cars – even boats ... your trip, ask your pharmacist about how to travel safely with your medicines. Make sure that you ...

  10. The application of systematic analysis to the development for maintenance staffs training contents in Nuclear Power Station

    International Nuclear Information System (INIS)

    Ishida, Takahisa; Maruo, Tadashi; Kurokawa, Kazuya

    2005-01-01

    To survive the tide of electric power industry deregulation, actions for streamlining our operations must be compatible with safe of plant operation. With regard to the human resource issue, retirement of first line engineers who developed their practical technical skills through the process of experiencing numerous problems or plant construction can raise concerns regarding a decline in our engineering abilities. Under these circumstances, to prepare sophisticated maintenance engineers, training programs must be optimized by considering the most effective and efficient method and material. Despite the IAEA's SAT (Systematic Approach to Training) method being widely applied to train nuclear power plants operators, there are few reports that it is applied to maintenance engineers. This paper will discuss our attempt to introduce more effective and efficient training for maintenance engineers, as well as refer to the SAT method to analyze the education program as a whole. (author)

  11. With a re-engineering of maintenance to a profitably oriented maintenance

    International Nuclear Information System (INIS)

    Angelevska, Silvana; Jolevski, Tome

    2000-01-01

    This paper presents an overview of effectiveness of the profit centered maintenance as a contemporary way of the maintenance management concept. Such redesign of a maintenance procedure results in significant gains in cost reduction and increase of the profitability and competitiveness of energy. The business process re engineering - a modern management control theory that is important aspect of the profit centered maintenance is summarized

  12. Automated System Checkout to Support Predictive Maintenance for the Reusable Launch Vehicle

    Science.gov (United States)

    Patterson-Hine, Ann; Deb, Somnath; Kulkarni, Deepak; Wang, Yao; Lau, Sonie (Technical Monitor)

    1998-01-01

    The Propulsion Checkout and Control System (PCCS) is a predictive maintenance software system. The real-time checkout procedures and diagnostics are designed to detect components that need maintenance based on their condition, rather than using more conventional approaches such as scheduled or reliability centered maintenance. Predictive maintenance can reduce turn-around time and cost and increase safety as compared to conventional maintenance approaches. Real-time sensor validation, limit checking, statistical anomaly detection, and failure prediction based on simulation models are employed. Multi-signal models, useful for testability analysis during system design, are used during the operational phase to detect and isolate degraded or failed components. The TEAMS-RT real-time diagnostic engine was developed to utilize the multi-signal models by Qualtech Systems, Inc. Capability of predicting the maintenance condition was successfully demonstrated with a variety of data, from simulation to actual operation on the Integrated Propulsion Technology Demonstrator (IPTD) at Marshall Space Flight Center (MSFC). Playback of IPTD valve actuations for feature recognition updates identified an otherwise undetectable Main Propulsion System 12 inch prevalve degradation. The algorithms were loaded into the Propulsion Checkout and Control System for further development and are the first known application of predictive Integrated Vehicle Health Management to an operational cryogenic testbed. The software performed successfully in real-time, meeting the required performance goal of 1 second cycle time.

  13. Assessing maintenance contracts when preventive maintenance is outsourced

    International Nuclear Information System (INIS)

    Wu Shaomin

    2012-01-01

    In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical examples are also given to explore the impact of parameters on the expected lifecycle cost rate.

  14. Portsmouth Gaseous Diffusion Plant Decontamination and Decommissioning Program surveillance and maintenance plan, FY 1993--2002

    International Nuclear Information System (INIS)

    Schloesslin, W.

    1992-11-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Portsmouth Gaseous Diffusion Plant (PORTS) is part of the Environmental Restoration (ER) and Waste Management (WM) Programs (ERWM). The objective of the ER Program is to provide PORTS the capability to meet applicable environmental regulations through facility development activities and site remedial actions. The WM Program supports the ER Program. The D ampersand D Program provides collective management of the sites within the plant which require decontamination and decommissioning, prioritizes those areas in terms of health, safety and environmental concerns, and implements the appropriate level of remedial action. The D ampersand D Program provides support to facilities which formerly served one or more of the many Plant functions. Program activities include (1) surveillance and maintenance of facilities awaiting decommissioning; (2) planning safe and orderly facility decommissioning; and (3) implementing a program to accomplish facility disposition in a safe, cost effective, and timely manner. In order to achieve the first objective, a formal plan which documents the surveillance and maintenance needs for each inactive facility has been prepared. This report provides this documentation for the PORTS facilities currently included in the D ampersand D Program and includes projected resource requirements for the planning period of FY 1993 through FY 2002

  15. Managing nuclear maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    For utilities operating nuclear powerplants, the rules of the game continue to change. Conflicting regulatory pressures and a tougher competitive environment will make management's job more complicated and difficult in the 1990s. Dealing with these pressures successfully requires greater attention to maintenance effectiveness. Utilities can help shape their future environment by developing a well-planned strategy to guide their actions. Parts of the strategy that are discussed include developing a sound maintenance philosophy, selecting a service company, radiation exposure, and managing spare parts. This article also addresses the Swedish experience in maintenance, German philosophy regarding maintenance and the current maintenance practices of the Electricite de France

  16. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  17. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  18. Optimum analysis of pavement maintenance using multi-objective genetic algorithms

    Directory of Open Access Journals (Sweden)

    Amr A. Elhadidy

    2015-04-01

    Full Text Available Road network expansion in Egypt is considered as a vital issue for the development of the country. This is done while upgrading current road networks to increase the safety and efficiency. A pavement management system (PMS is a set of tools or methods that assist decision makers in finding optimum strategies for providing and maintaining pavements in a serviceable condition over a given period of time. A multi-objective optimization problem for pavement maintenance and rehabilitation strategies on network level is discussed in this paper. A two-objective optimization model considers minimum action costs and maximum condition for used road network. In the proposed approach, Markov-chain models are used for predicting the performance of road pavement and to calculate the expected decline at different periods of time. A genetic-algorithm-based procedure is developed for solving the multi-objective optimization problem. The model searched for the optimum maintenance actions at adequate time to be implemented on an appropriate pavement. Based on the computing results, the Pareto optimal solutions of the two-objective optimization functions are obtained. From the optimal solutions represented by cost and condition, a decision maker can easily obtain the information of the maintenance and rehabilitation planning with minimum action costs and maximum condition. The developed model has been implemented on a network of roads and showed its ability to derive the optimal solution.

  19. 42 CFR 418.76 - Condition of participation: Hospice aide and homemaker services.

    Science.gov (United States)

    2010-10-01

    ... reported to an aide's supervisor. (vi) Maintenance of a clean, safe, and healthy environment. (vii..., emotional, and developmental needs of and ways to work with the populations served by the hospice, including... techniques and ambulation. (xi) Normal range of motion and positioning. (xii) Adequate nutrition and fluid...

  20. Preventive maintenance: optimization of time - based discard decisions at the bruce nuclear generating station

    International Nuclear Information System (INIS)

    Doyle, E.K.; Jardine, A.K.S.

    2001-01-01

    The use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. As previously reported at ICONE 6 in New Orleans, 1996, several innovative practices reduced Reliability Centered Maintenance costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is in place where an Expert Panel consisting of all players/experts proceed through each system in a disciplined fashion and reach agreement on all items under a rigorous time frame. It is well known that there are essentially 3 maintenance based actions that can flow from a Maintenance Optimization Analysis: condition based maintenance, time based maintenance and time based discard. The present effort deals with time based discard decisions. Maintenance data from the Remote On-Power Fuel Changing System was used. (author)