  1. River Corridor Project Workplace Air Monitoring Technical Basis

    International Nuclear Information System (INIS)

    MANTOOTH, D.S.

    2001-01-01

    This document provides the technical basis by which the workplace air monitoring and sampling program is operated in the River Corridor Project (RCP). Revision 2 addresses and incorporates changes in the air monitoring program drivers and implementing documents which occurred after the previous revision was issued. This revision also includes an additional RCP project to make Revision 2 applicable to the entire RCP. These changes occurred in the following areas: (1) Changes resulting from the conversion of the Hanford Site Radiological Control Manual (HSRCM-1) into the Project Hanford Radiological Control Manual (F-5173). HNF-5173 is now the implementing document for 10CFR835. (2) Changes resulting from the issue of new and revised Hanford Site implementing procedures. (3) Changes resulting from the issue of new and revised, as well as the cancellation of RCP implementing procedures. (4) Addition of the 200 Area Accelerated Deactivation Project (ADP). (5) Modification of some air sampling/monitoring locations to better meet the needs of facility operations. (6) Changes resulting from the RCP reorganization

  2. An Evaluation of the Science Education Component of the Cross River State Science and Technical Education Project

    Science.gov (United States)

    Ekuri, Emmanuel Etta

    2012-01-01

    The Cross River State Science and Technical Education Project was introduced in 1992 by edict number 9 of 20 December 1991, "Cross River State Science and Technical Education Board Edit, 20 December, 1991", with the aim of improving the quality of science teaching and learning in the state. As the success of the project depends…

  3. River Protection Project waste feed delivery program technical performance measurement assessment plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle

  4. Alligator Rivers analogue project

    International Nuclear Information System (INIS)

    Duerden, P.

    1990-01-01

    Australian Nuclear Science and Technology Organization has extensively evaluated uranium ore bodies in the Alligator Rivers Uranium Province in Australia as analogues of radioactive waste repositories. The work was extended for a three-year program as an international project based on the Koongarra uranium deposit and sponsored by the OECD Nuclear Energy Agency. The technical program comprises six major sub-projects involving modelling and experimental work: modelling of radionuclide migration; hydrogeology of the Koongarra uranium deposit; uranium/thorium series disequilibria studies; groundwater and colloid studies; fission product studies; transuranic nuclide studies; an outline of the technical programs and a summary of progress in the technical sub-projects is given. This is followed by a series of technical reports which briefly describe current research tasks, and which have been separately indexed

  5. Critical revision of the technical aspects of sanitation of the Bogota river 1994 project

    International Nuclear Information System (INIS)

    Giraldo Eugenio

    1996-01-01

    A moral obligation exists on the part of the human societies of having designed to remove the contamination the environment that has been commended to manage and that it represents the inheritance that guarantees the survival of the species in the earth planet. It exists a growing recognition of this imperious necessity at the present time on the part of all the societies in the world that immediately opens the roads for the political exploitation of so praiseworthy feelings. Paradoxically, the environmentalist feelings don't always redound in a better protection for the nature and the environment, natural or urban. The reparation plan to continue for the Decontamination of the Bogot River; hired by the concession system the first stage of the same one, it is summarized in making three plants of treatment of located residual waters, each one of them in the outlets on the Bogota river of the main basins of drainage of the sanitary sewer system of the city. The treatment plants are of a conventional technology, mud activated that basically are designed to remove 90% of the contamination for organic matter that takes the sanitary sewer system of the respective basin. This level of achieved treatment is denominated in the technical literature as secondary treatment

  6. Habitat Evaluation Procedures (HEP) Report; Priest River Project, Technical Report 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-05-01

    On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Priest River property, an acquisition completed by the Kalispel Tribe of Indians in 2001. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Priest River Project provides a total of 140.73 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 60.05 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Grassland meadow habitat provides 7.39 HUs for Canada goose and mallard. Scrub-shrub vegetation provides 71.13 HUs for mallard, yellow warbler, and white-tailed deer. Open water habitat provides 2.16 HUs for Canada goose and mallard. The objective of using HEP at the Priest River Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  7. Technical activities of the Project Surata River for the handling of mercury and cyanide

    International Nuclear Information System (INIS)

    Pinzon, Juan Manuel; Ruiz, Jorge Nelson; Jaimes, Cristian Libardo

    2004-01-01

    The technical works executed by the project have been framed in the philosophy of reducing the contamination for mercury and cyanide in the operations of auriferous benefit, without causing detriment in the economic revenues of the miners, on the contrary, trying to carry out a better use of the auriferous mineral. In this sense, the project has toasted from simple solutions that allow to reduce the use of the pollutants mentioned a little until solutions more complex than they require introduction of gravimetric teams in pro of reducing the quantity of minerals amalgamated y/o cyanidates. This way an action plan was developed that contemplates a diagnosis stage, followed by a stage of executions in which has been worked in the modification of the systems of gravimetric concentration, process of amalgamation and in the cyanidation process. Particular emphasis has noticed to the cyanidation process for percolation, given its importance in the benefit and its degree of environmental affectation. Through a revision of the method used by the miners, it was possible to modify the technique and to reduce in 40% the global consumption of cyanide in the companies of the District Mining Vetas - California. Metallurgic studies in the advised companies allowed to verify that strengthening the gravimetric concentration is possible to gather 80% of the gold (heavy minerals) in 15% of the processed global material. Under these conditions the introduction of the cyanidation is facilitated by agitation, allowing to reduce the contamination for cyanide and to make a bigger use of the auriferous mineral

  8. Final Technical Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    Glaspey, Douglas J.

    2008-01-30

    Incorporates the results of flow tests for geothermal production and injection wells in the Raft River geothermal field in southern Idaho. Interference testing was also accomplished across the wellfield.

  9. Sapucai River Project

    International Nuclear Information System (INIS)

    Duarte, A.L.; Rosa, M.J.

    1988-01-01

    The Sapucai River Project is a gold, ilmenite, monazite and zircon alluvial deposit. It is located on Sapucai River valley in the south of Minas Gerais State. The reserves are 28.000.000 m 3 of pay bed. The production will be 1.400.000 m 3 /year and the mine's life 20 years. A cutterhead suction dredge will do the overburden removal. The pay bed will be mined with an underwater bucket-wheel dredge. The ROM will be concentrated in a washing plant. The gold will be recovered by leaching method. The other heavy minerals will be recovered by electrostatic, magnetic and gravitic methods. SAMITRI believes that it's possible to implant and operate the Project without ecological damage. (author) [pt

  10. Savannah River bus project

    Energy Technology Data Exchange (ETDEWEB)

    Summers, W.A. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1998-08-01

    The H2Fuel Bus is the world`s first hybrid hydrogen electric transit bus. It was developed through a public/private partnership involving several leading technology and industrial organizations in the Southeast, with primary funding and program management provided by the Department of Energy. The primary goals of the project are to gain valuable information on the technical readiness and economic viability of hydrogen buses and to enhance the public awareness and acceptance of emerging hydrogen technologies. The bus has been operated by the transit agency in Augusta, Georgia since April, 1997. It employs a hybrid IC engine/battery/electric drive system, with onboard hydrogen fuel storage based on the use of metal hydrides. Initial operating results have demonstrated an overall energy efficiency (miles per Btu) of twice that of a similar diesel-fueled bus and an operating range twice that of an all-battery powered electric bus. Tailpipe emissions are negligible, with NOx less than 0.2 ppm. Permitting, liability and insurance issues were addressed on the basis of extensive risk assessment and safety analyses, with the inherent safety characteristic of metal hydride storage playing a major role in minimizing these concerns. Future plans for the bus include continued transit operation and use as a national testbed, with potential modifications to demonstrate other hydrogen technologies, including fuel cells.

  11. Trojan technical specification verification project

    International Nuclear Information System (INIS)

    Bates, L.; Rickenback, M.

    1991-01-01

    The Trojan Technical Specification Verification (TTSV) project at the Trojan plant of Portland General Electric Company was motivated by the recognition that many numbers in the Trojan technical specifications (TTS) potentially lacked the consideration of instrument- and/or process-related errors. The plant setpoints were known to consider such errors, but many of the values associated with the limiting conditions for operation (LCO) did not. In addition, the existing plant instrument error analyses were based on industry values that do not reflect the Trojan plant-specific experience. The purpose of this project is to ensure that the Trojan plant setpoint and LCO values include plant-specific instrument error

  12. Hazardous materials in aquatic environments of the Mississippi River Basin Project management. Technical quarterly progress report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    McLachlan, J.; Ide, C.F.; O`Connor, S.

    1996-08-01

    This quarterly report summarizes accomplishments for the Project examining hazardous materials in aquatic environments of the Mississippi River Basin. Among the many research areas summarized are the following: assessment of mechanisms of metal-induced reproductive toxicity in aquatic species as a biomarker of exposure; hazardous wastes in aquatic environment;ecological sentinels of aquatic contamination in the lower Mississippi River System; remediation of selected contaminants; rapid on-site immunassay for heavy metal contamination; molecular mechanisms of developmental toxicity induced by retinoids and retinoid-like molecules; resuseable synthetic membranes for the removal of aromatic and halogenated organic pollutants from waste water; Effects of steroid receptor activation in neurendocrine cell of the mammalian hypothalamus; modeling and assessment of environmental quality of louisiana bayous and swamps; enhancement of environmental education. The report also contains a summary of publications resulting from this project and an appendix with analytical core protocals and target compounds and metals.

  13. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    Certa, P.J.; Kirkbride, R.A.; Hohl, T.M.; Empey, P.A.; Wells, M.N.

    2009-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  14. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and

  15. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  16. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  17. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  18. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    CERTA PJ

    2008-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  19. Technical efficiency among the food crop farmers in Rivers State ...

    African Journals Online (AJOL)

    This study estimated technical efficiency and isolated determinants of technical inefficiency among food crop farmers in Rivers State, Nigeria. The data was collected with structured questionnaire from 180 food crop farmers randomly selected from 10 out of the 15 upland LGAs that make up Rivers State. A stochastic frontier ...

  20. An Ecosystem-Based Approach to Habitat Restoration Projects with Emphasis on Salmonids in the Columbia River Estuary, 2003 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, G.; Thom, R.; Whiting, A. (Pacific Northwest National Laboratory)

    2003-11-01

    Habitat restoration in the Columbia River estuary (CRE) is an important off-site mitigation action in the 2000 Biological Opinion (BiOp), an operation of the Federal Columbia River Power System. The CRE, defined as the tidally influenced stretch of river from the mouth to Bonneville Dam 146 miles upstream, is part of the migration pathway for anadromous fish in the Columbia Basin, including salmon listed under the Endangered Species Act (ESA). Salmon in various stages of life, from fry to adults, use tidal channels and wetlands in the CRE to feed, find refuge from predators, and transition physiologically from freshwater to saltwater. Over the last 100 years, however, the area of some wetland habitats has decreased by as much as 70% because of dike and levee building, flow regulation, and other activities. In response to the decline in available habitat, the BiOp's Reasonable and Prudent Alternative (RPA) included mandates to 'develop a plan addressing the habitat needs of juvenile salmon and steelhead in the estuary' (RPA Action 159) and 'develop and implement an estuary restoration program with a goal of protecting and enhancing 10,000 acres of tidal wetlands and other key habitats' (RPA Action 160). To meet Action 159 and support Action 160, this document develops a science-based approach designed to improve ecosystem functions through habitat restoration activities in the CRE. The CRE habitat restoration program's goal and principles focus on habitat restoration projects in an ecosystem context. Since restoration of an entire ecosystem is not generally practical, individual habitat restoration projects have the greatest likelihood of success when they are implemented with an ecosystem perspective. The program's goal is: Implementation of well-coordinated, scientifically sound projects designed to enhance, protect, conserve, restore, and create 10,000 acres of tidal wetlands and other key habitats to aid rebuilding of ESA

  1. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hanson, David [Sacramento Municipal Unitlity District, Sacramento, CA (United States)

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  2. Independent technical review of Savannah River Site Defense Waste Processing Facility technical issues

    International Nuclear Information System (INIS)

    1992-07-01

    The Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) will vitrify high-level radioactive waste that is presently stored as liquid, salt-cake, and sludge in 51 waste-storage tanks. Construction of the DWPF began in 1984, and the Westinghouse Savannah Company (WSRC) considers the plant to be 100% turned over from construction and 91% complete. Cold-chemical runs are scheduled to begin in November 1992, and hot start up is projected for June 1994. It is estimated that the plant lifetime must exceed 15 years to complete the vitrification of the current, high-level tank waste. In a memo to the Assistant Secretary for Defense Programs (DP-1), the Assistant Secretary for Environmental Restoration and Waste management (EM-1) established the need for an Independent Technical Review (ITR), or the Red Team, to ''review process technology issues preventing start up of the DWPF.'' This report documents the findings of an Independent Technical Review (ITR) conducted by the Department of Energy (DOE), Office of Environmental Restoration and Waste Management (EM), at the request of the Assistant Secretary for Environmental Restoration and Waste Management, of specified aspects of Defense Waste Process Facility (DWPF) process technology. Information for the assessment was drawn from documents provided to the ITR Team by the Westinghouse Savannah River Company (WSRC), and presentations, discussions, interviews, and tours held at the Savannah River Site (SRS) during the weeks of February and March 9, 1992

  3. Waste management project technical baseline description

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1997-01-01

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project

  4. Spent nuclear fuel project technical databook

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1998-01-01

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values

  5. Spent nuclear fuel project technical databook

    Energy Technology Data Exchange (ETDEWEB)

    Reilly, M.A.

    1998-07-22

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values.

  6. Should Project Managers Buy Technical Data

    Science.gov (United States)

    2017-04-06

    the future. The research also exposed perspective organizational viewpoints on what technical data rights are needed and what analysis is available...DAU professor Dr. John Larson. To conclude, this research project was completed with tremendous love and support from my family . Address any...Study ........................................................................................................... 2 Significance of This Research

  7. Lower Red River Meadow Stream Restoration Project

    International Nuclear Information System (INIS)

    1996-05-01

    As part of a continuing effort to restore anadromous fish populations in the South Fork Clearwater River basin of Idaho, Bonneville Power Administration (BPA) proposes to fund the Lower Red River Meadow Restoration Project (Project). The Project is a cooperative effort with the Idaho Soil and Water Conservation District, Nez Perce National Forest, Idaho Department of Fish and Game (IDFG), and the Nez Perce Tribe of Idaho. The proposed action would allow the sponsors to perform stream bank stabilization, aquatic and riparian habitat improvement activities on IDFG's Red River Management Area and to secure long-term conservation contracts or agreements for conducting streambank and habitat improvement activities with participating private landowners located in the Idaho County, Idaho, study area. This preliminary Environmental Assessment (EA) examines the potential environmental effects of stabilizing the stream channel, restoring juvenile fish rearing habitat and reestablishing a riparian shrub community along the stream

  8. McKenzie River Subbasin Assessment, Technical Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Alsea Geospatial, Inc.

    2000-02-01

    This document details the findings of the McKenzie River Subbasin Assessment team. The goal of the subbasin assessment is to provide an ecological assessment of the McKenzie River Floodplain, identification of conservation and restoration opportunities, and discussion of the influence of some upstream actions and processes. This Technical Report can be viewed in conjunction with the McKenzie River Subbasin Summary or as a stand-alone document. The purpose of the technical report is to detail the methodology and findings of the consulting team that the observations and recommendations in the summary document are based on. This part, Part I, provides an introduction to the subbasin and a general overview. Part II details the specific findings of the science team. Part III provides an explanation and examples of how to use the data that has been developed through this assessment to aid in prioritizing restoration activities. Part III also includes the literature cited and appendices.

  9. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  10. Clinch River breeder project gets boost

    International Nuclear Information System (INIS)

    Hill, W.H.

    1982-01-01

    Progress on the Clinch River Breeder Reactor Plant project, the United States' next step in developing liquid metal fast breeder technology is examined including consideration of Plant design, component fabrication and testing, construction schedule, funding, fuel cycle development and licensing. (U.K.)

  11. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  12. Building on the Orange river project

    International Nuclear Information System (INIS)

    Skinner, J.

    1999-01-01

    The life of the World Commission on Dams (WCD) is due to end in mid-2000. In order to achieve its objective of making recommendations on the environmental, social, economic and institutional questions on dams, it will conduct up to ten case studies where the dams and river basins have been selected according to their age, function, regional representation and the lessons to be learned. The Orange River project in South Africa is being used as a pilot study for the other case studies and the reactions to the study are discussed. The case studies will focus on planning, implementation and operation of the dams with respect to their river basins. Six questions are listed and these will need to be answered to form a basis for a structured approach. To date, stakeholder meetings and fieldwork have highlighted four common generic difficulties and these are listed. A form for completion by interested parties was included with the article. (UK)

  13. Project SHARE Sustainable Hydropower in Alpine Rivers Ecosystems

    Science.gov (United States)

    Mammoliti Mochet, Andrea

    2010-05-01

    SHARE - Sustainable Hydropower in Alpine Rivers Ecosystems is a running project early approved and co funded by the European regional development fund in the context of the European Territorial Cooperation Alpine Space programme 2007 - 2013: the project is formally ongoing from August 2009 and it will end July 2012. Hydropower is the most important renewable resource for electricity production in alpine areas: it has advantages for the global CO2 balance but creates serious environmental impacts. RES-e Directives require renewable electricity enhance but, at the same time, the Water Framework Directive obliges member States to reach or maintain a water bodies "good" ecological status, intrinsically limiting the hydropower exploitation. Administrators daily face an increasing demand of water abstraction but lack reliable tools to rigorously evaluate their effects on mountain rivers and the social and economical outputs on longer time scale. The project intends to develop, test and promote a decision support system to merge on an unprejudiced base, river ecosystems and hydropower requirements. This approach will be led using existing scientific tools, adjustable to transnational, national and local normative and carried on by permanent panel of administrators and stakeholders. Scientific knowledge related to HP & river management will be "translated" by the communication tools and spent as a concrete added value to build a decision support system. In particular, the Multicriteria Analysis (MCA) will be applied to assess different management alternatives where a single-criterion approach (such as cost-benefit analysis) falls short, especially where environmental, technical, economic and social criteria can't be quantified by monetary values. All the existing monitoring databases will be used and harmonized with new information collected during the Pilot case studies. At the same time, all information collected will be available to end users and actors of related

  14. Evaluation of River Bend Station Unit 1 Technical Specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-08-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the River Bend Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the requirements of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the River Bend T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The River Bend Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  15. The Future of Project Management in Technical Communication

    DEFF Research Database (Denmark)

    Kampf, Constance

    2006-01-01

    Project Management increasing shapes workplace communication, especially when technical commuicators participate in cross-disciplinary development teams. This paper looks at the future of project management in technical communication and argues for a communicative approach to project management...... for technical communication students. The Project Management course in the International Bachelor Program of Marketing and Management Communication at the Aarhus School of Business is described, and the implications fortechnical communication curricula are discussed....

  16. Projected future runoff of the Breede River under climate change ...

    African Journals Online (AJOL)

    The Breede River is the largest river in the Western Cape Province of South Africa, and as such, is a key resource for a variety of activities within the region. It is this significance of the river that prompted a study into the impact of climate change on future runoff in the river and hence, the potential impacts a projected change ...

  17. Technical management of difference in CEPR nuclear power project

    International Nuclear Information System (INIS)

    Guo Ruiting

    2014-01-01

    The Thesis dissertate the application of technical management of difference in CEPR Nuclear Power Project from EPR technical bases, condition of a nuclear power plant site, engineering and procurement, construction, quality management, schedule management and experience feedback aspects. (author)

  18. Effects of Green River Project on Cassava Farmers Production in ...

    African Journals Online (AJOL)

    This paper examined the effects of Green River project on cassava farmers' production in Ogba/Egbema/ Ndoni LGA of Rivers State. Purposive and stratified random sampling techniques were used to select the locations of Green River project, cooperative societies and respondents. Using structured questionnaire, a field ...

  19. SUPPLEMENTAL COLUMBIA RIVER PROTECTION ACTIVITIES AT THE DEPARTMENT OF ENERGY HANFORD SITE: 2006 TECHNICAL PEER REVIEW

    International Nuclear Information System (INIS)

    Looney, B; Dawn Kaback; Gene Leboeuf; Jason Mulvihill-Kuntz; Lynn Lefkoff

    2006-01-01

    Prompted by a $10 million Congressional allocation to identify supplemental actions to protect the Columbia River from groundwater contamination beneath the Hanford Reservation, the U. S. Department of Energy (DOE) Environmental Management (EM) Office of Clean-up Technology identified twenty-three potential technical projects and then down-selected ten of these for further evaluation. An independent expert peer review was conducted for the ten down-selected proposals. The review panel consisted of twenty-three recognized subject matter experts that broadly represented academia, industry, and federal laboratories. Of the initial ten proposals reviewed, one was given unconditional support, six were given conditional support, and three were not supported as proposed. Three additional proposals were then submitted by DOE for review--these proposals were structured, in part, to respond to the initial round of technical peer review comments. Peer reviews of these additional proposals provided conditional support. For those proposals that received conditional support, DOE requested specific implementation and work plans and assessed whether the plans adequately addressed the technical conditions identified by the review panel. The final list of technology proposals receiving support, or conditional support, primarily focused on understanding and reducing the potential impacts of uranium, chromium, and strontium from facilities adjacent to the Columbia River, with a secondary focus on understanding and limiting the future Columbia River impacts from the large carbon tetrachloride groundwater plume underlying and downgradient of the Hanford Central Plateau facilities. The results and recommendations of the peer reviews informed the final DOE project selections and supported implementation of the selected projects to protect the Columbia River and address groundwater contamination at Hanford

  20. SUPPLEMENTAL COLUMBIA RIVER PROTECTION ACTIVITIES AT THE DEPARTMENT OF ENERGY HANFORD SITE: 2006 TECHNICAL PEER REVIEW

    Energy Technology Data Exchange (ETDEWEB)

    Looney, B; Dawn Kaback; Gene Leboeuf; Jason Mulvihill-Kuntz; Lynn Lefkoff

    2006-12-20

    Prompted by a $10 million Congressional allocation to identify supplemental actions to protect the Columbia River from groundwater contamination beneath the Hanford Reservation, the U. S. Department of Energy (DOE) Environmental Management (EM) Office of Clean-up Technology identified twenty-three potential technical projects and then down-selected ten of these for further evaluation. An independent expert peer review was conducted for the ten down-selected proposals. The review panel consisted of twenty-three recognized subject matter experts that broadly represented academia, industry, and federal laboratories. Of the initial ten proposals reviewed, one was given unconditional support, six were given conditional support, and three were not supported as proposed. Three additional proposals were then submitted by DOE for review--these proposals were structured, in part, to respond to the initial round of technical peer review comments. Peer reviews of these additional proposals provided conditional support. For those proposals that received conditional support, DOE requested specific implementation and work plans and assessed whether the plans adequately addressed the technical conditions identified by the review panel. The final list of technology proposals receiving support, or conditional support, primarily focused on understanding and reducing the potential impacts of uranium, chromium, and strontium from facilities adjacent to the Columbia River, with a secondary focus on understanding and limiting the future Columbia River impacts from the large carbon tetrachloride groundwater plume underlying and downgradient of the Hanford Central Plateau facilities. The results and recommendations of the peer reviews informed the final DOE project selections and supported implementation of the selected projects to protect the Columbia River and address groundwater contamination at Hanford.

  1. River Protection Project: Interface Management in the Multi Contract Project Environment at Hanford

    International Nuclear Information System (INIS)

    SHIKASHIO, L.A.

    2000-01-01

    The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces

  2. Savannah River Site production reactor technical specifications. K Production Reactor

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    These technical specifications are explicit restrictions on the operation of the Savannah River Site K Production Reactor. They are designed to preserve the validity of the plant safety analysis by ensuring that the plant is operated within the required conditions bounded by the analysis, and with the operable equipment that is assumed to mitigate the consequences of an accident. Technical specifications preserve the primary success path relied upon to detect and respond to accidents. This report describes requirements on thermal-hydraulic limits; limiting conditions for operation and surveillance for the reactor, power distribution control, instrumentation, process water system, emergency cooling and emergency shutdown systems, confinement systems, plant systems, electrical systems, components handling, and special test exceptions; design features; and administrative controls.

  3. Virginia Solar Pathways Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Katharine; Cosby, Sarah

    2018-03-28

    This Report provides a technical review of the final results of a funding award to Virginia Electric and Power Company (Dominion Energy Virginia (DEV) or the Company) for a project under the U.S. Department of Energy’s Solar Energy Technologies Office. The three-year project was formally known as the Virginia Solar Pathways Project (VSPP or the Project). The purpose of the VSPP was to develop a collaborative utility-administered solar strategy (Solar Strategy) for DEV’s service territory in the Commonwealth that could serve as a replicable model for other states with similar policy environments. The U.S. Department of Energy (DOE) funding award enabled DEV to take a focused approach to developing the Solar Strategy for its Virginia service territory. The structure and funding from the DOE award also facilitated valuable input from a formal stakeholder team convened to serve as advisors (Advisory Team) to the VSPP and contribute their perspectives and expertise to both the analysis and strategy development aspects of the Project. The development of the Solar Strategy involved three main goals: • Establish a policy and program framework that would integrate existing solar programs with new options appropriate for the Commonwealth’s policy environment and broader economic development objectives; • Promote wider deployment of solar within a low retail electric rate environment; and • Serve as a sustainable, utility-administered solar model that could be replicated in other states with similar policy environments, including, but not limited to, the entire Southeast region. In support of the VSPP goals, the Project Team commissioned four studies to support the Solar Strategy development. Two studies, completed by Navigant Consulting, focused on the integration of solar into the electric grid. The first solar integration study focused on integration of solar into the distribution grid where the utility system directly connects to and serves end-use customers

  4. Hudson River settlement agreement: Technical rationale and cost considerations

    International Nuclear Information System (INIS)

    Barnthouse, L.W.; Boreman, J.; Englert, T.L.; Kirk, W.L.; Horn, E.G.

    1988-01-01

    In an effort to end litigation over open-cycle cooling at Hudson River power plants, out-of-court negotiations began in August 1979. On December 19, 1980, an agreement that was acceptable to all parties was reached. As an alternative to building cooling towers at the Indian Point, Bowline Point, and Roseton generating stations, the utilities agreed to a variety of technical and operational changes intended to reduce entrainment and impingement. In addition, they agreed to supplement the production of striped bass in the Hudson River estuary by means of a hatchery, to conduct a biological monitoring program, and to fund an independent research foundation for study of Hudson River environmental problems. Although the settlement costs were substantial, they were much smaller than the estimated costs of constructing and operating cooling towers. The settlement was expected to provide 15-43% of the impact reduction that might have been obtained with cooling at approximately 10% of the cost. 20 refs., 3 tabs

  5. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  6. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  7. The CANTEACH project: preserving CANDU technical knowledge

    International Nuclear Information System (INIS)

    Garland, B.; Kosarenko, Y.; Meneley, D.

    2003-01-01

    Almost sixty years have passed since the nuclear energy venture began in Canada. Fifty years have passed since the founding of AECL. Tens of thousands of dedicated people have forged a new and successful primary energy supply. CANDU technology is well into its second century. This specialty within the world's fission technology community is quite unique, first because it was established as a separate effort very early in the history of world fission energy, and second because it grew in an isolated environment, with tight security requirements, in its early years. Commercial security rules later sustained a considerable degree of isolation. The pioneers of CANDU development have finished their work. Most of the second generation also has moved on. As yet, we cannot point to a consistent and complete record of this remarkable achievement. We, as a nuclear enterprise, have not captured the design legacy in a form that is readily accessible to the current and future generation of professionals involved with CANDU reactors, be they students, designers, operations staff, regulators, consultants or clients. This is a serious failure. Young people entering our field of study must make do with one or two textbooks and a huge collection of diverse technical papers augmented by limited-scope education and training materials. Those employed in the various parts of the nuclear industry rely mostly on a smaller set of CANDU- related documents available within their own organization; documents that sometimes are rather limited in scope. University professors often have even more limited access to in-depth and up to date information. In fact, they often depend on literature published in other countries when preparing lectures, enhanced by guest lecturers from various parts of the industry. Because CANDU was developed mostly inside Canada, few of these text materials contain useful data describing processes important to the CANDU system. For many years it has been recognized that

  8. Technical assistance for Meharry Medical College Energy Efficiency Project. Final project status and technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-08

    This report presents the results of a program to provide technical assistance to Meharry Medical College. The purpose of the program is to facilitate Meharry`s effort to finance a campus-wide facility retrofit. The US Department of Energy (USDOE) funded the program through a grant to the Tennessee Department of Economic and Community Development (TECD). The University of Memphis-Technology and Energy Services (UM-TES), under contract to TECD, performed program services. The report has three sections: (1) introduction; (2) project definition, financing, and participants; and (3) opportunities for federal participation.

  9. Environmental impacts of Ghazi Barotha hydropower project on river Indus and surrounding areas

    International Nuclear Information System (INIS)

    Soomro, G.A.; Sufi, A.B.

    2005-01-01

    WAPDA being an esteemed organization of the country is involved in development of Water and Power Sector Projects. Ghazi Barotha Hydropower Project is another huge hydropower generation project in the country after Tarbela. The barrage to feed power channel of Ghazi Barotha Power Station are built over River Indus 7 Km down of Tarbela Dam. The project has been constructed to utilize the hydraulic head for power generation that is available between the tailrace of Tarbela Dam and the confluence of Haro River. In this reach river Indus drops by 76 m in distance of 63 Km. This is solely a power generation project with an installed capacity of 1450 MW. The purpose of this paper is to assess the negative impacts on the River Indus due to the construction of GBHP as Water of river Indus will be diverted to the power channel and the river Indus flows go to its lowest in low flow season. The reduction in river flow may change the ecology of the river - belas and people dependant on river water. In this context a study was made to keep the negative environmental impacts as low as possible and suggest mitigation measures to reduce negative impacts and provide enhancement measure to compensate the losses to be sustained by the area people and maintain the social life along with the ecology of the area less disturbed. The study demonstrated that the project is technically sound, economically viable and has limited environmental and social impacts on the area overall and specific the belas and people dependant on the Indus Water from Tarbela downstream up to confluence of Kabul River. (author)

  10. Hood River Conservation Project load analysis

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, T.K.

    1987-11-01

    As a part of the Hood River Conservation Project (HRCP), 314 homes were monitored to measure electrical energy use. The total electrical load, space heating load, water heating load (in about 200 homes), wood-stove heat output (in about 100 homes), and indoor temperature were monitored. Data were collected for one full year before and one full year after these homes were retrofit with conservation measures. Local weather information was also collected on a 15-min basis. This data base was used to evaluate the load savings attributable to HRCP. Two methods of weather normalization were used and showed close agreement. The weather-normalized diversified residential load savings on the Pacific Power and Light system and Hood River area peak days were >0.5 kW/household. The average spring, summer, and fall savings were much smaller, <0.1 kW/household. The load factor for the diversified residential load decreased following the conservation retrofit actions. 11 refs., 40 figs., 13 tabs.

  11. WABASH RIVER COAL GASIFICATION REPOWERING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2000-09-01

    The close of 1999 marked the completion of the Demonstration Period of the Wabash River Coal Gasification Repowering Project. This Final Report summarizes the engineering and construction phases and details the learning experiences from the first four years of commercial operation that made up the Demonstration Period under Department of Energy (DOE) Cooperative Agreement DE-FC21-92MC29310. This 262 MWe project is a joint venture of Global Energy Inc. (Global acquired Destec Energy's gasification assets from Dynegy in 1999) and PSI Energy, a part of Cinergy Corp. The Joint Venture was formed to participate in the Department of Energy's Clean Coal Technology (CCT) program and to demonstrate coal gasification repowering of an existing generating unit impacted by the Clean Air Act Amendments. The participants jointly developed, separately designed, constructed, own, and are now operating an integrated coal gasification combined-cycle power plant, using Global Energy's E-Gas{trademark} technology (E-Gas{trademark} is the name given to the former Destec technology developed by Dow, Destec, and Dynegy). The E-Gas{trademark} process is integrated with a new General Electric 7FA combustion turbine generator and a heat recovery steam generator in the repowering of a 1950's-vintage Westinghouse steam turbine generator using some pre-existing coal handling facilities, interconnections, and other auxiliaries. The gasification facility utilizes local high sulfur coals (up to 5.9% sulfur) and produces synthetic gas (syngas), sulfur and slag by-products. The Project has the distinction of being the largest single train coal gasification combined-cycle plant in the Western Hemisphere and is the cleanest coal-fired plant of any type in the world. The Project was the first of the CCT integrated gasification combined-cycle (IGCC) projects to achieve commercial operation.

  12. The new Wallula CO2 project may revive the old Columbia River Basalt (western USA) nuclear-waste repository project

    Science.gov (United States)

    Schwartz, Michael O.

    2018-02-01

    A novel CO2 sequestration project at Wallula, Washington, USA, makes ample use of the geoscientific data collection of the old nuclear waste repository project at the Hanford Site nearby. Both projects target the Columbia River Basalt (CRB). The new publicity for the old project comes at a time when the approach to high-level nuclear waste disposal has undergone fundamental changes. The emphasis now is on a technical barrier that is chemically compatible with the host rock. In the ideal case, the waste container is in thermodynamic equilibrium with the host-rock groundwater regime. The CRB groundwater has what it takes to represent the ideal case.

  13. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  14. Alligator Rivers Analogue Project. Final Report - Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Duerden, P [Australian Nuclear Science and Technology Organisation (ANSTO), Lucas Heights, NSW (Australia); Lever, D A [AEA Technology, Harwell (United Kingdom); Sverjensky, D A [Johns Hopkins Univ., Baltimore, MD (United States); Townley, L R [Commonwealth Scientific and Industrial Research Organisation (CSIRO), Wembley, WA (Australia). Div. of Water Resources

    1992-07-01

    This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project (ARAP) is one of a series of 16 volumes, listed below. Detailed descriptions and results are provided in Volumes 2 to 16. Full acknowledgment to individual contributions is provided in the individual reports, and in Appendix I of this report. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. Thus, section 2 of this report discusses the concept of using uranium deposits as natural analogues and refers to a number of such studies, including those at the Koongarra deposit in the Alligator Rivers Region of the Northern Territory of Australia. Section 3 reviews early scientific work in the Alligator Rivers Region and summarises the results of the analogue studies undertaken between 1981 and 1987 that were funded by the US Nuclear Regulatory Commission (USNRC) and the UK Department of the Environment (UKDoE). Section 4 describes the objectives of ARAP and the manner in which the study was conducted and provides a general outline of the project and a summary of the findings. A general description of the Koongarra ore deposit, the focus of ARAP, is provided in Section 5, with Sections 6-13 providing summaries of the work carried out to characterise the site in detail and provide data for modelling. Sections 14-18 discuss how this data was used in modelling and how the results may be applied for performance assessment studies. Finally, Section 19 considers the

  15. Alligator Rivers Analogue Project. Final Report - Volume 1

    International Nuclear Information System (INIS)

    Duerden, P.; Lever, D.A.; Sverjensky, D.A.; Townley, L.R.

    1992-01-01

    This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project (ARAP) is one of a series of 16 volumes, listed below. Detailed descriptions and results are provided in Volumes 2 to 16. Full acknowledgment to individual contributions is provided in the individual reports, and in Appendix I of this report. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. Thus, section 2 of this report discusses the concept of using uranium deposits as natural analogues and refers to a number of such studies, including those at the Koongarra deposit in the Alligator Rivers Region of the Northern Territory of Australia. Section 3 reviews early scientific work in the Alligator Rivers Region and summarises the results of the analogue studies undertaken between 1981 and 1987 that were funded by the US Nuclear Regulatory Commission (USNRC) and the UK Department of the Environment (UKDoE). Section 4 describes the objectives of ARAP and the manner in which the study was conducted and provides a general outline of the project and a summary of the findings. A general description of the Koongarra ore deposit, the focus of ARAP, is provided in Section 5, with Sections 6-13 providing summaries of the work carried out to characterise the site in detail and provide data for modelling. Sections 14-18 discuss how this data was used in modelling and how the results may be applied for performance assessment studies. Finally, Section 19 considers the

  16. Office of River Protection: Simplifying Project management tools

    International Nuclear Information System (INIS)

    TAYLOR, D.G.

    2000-01-01

    The primary approach to the effort was to form a multi-organizational team comprised of federal and contractor staff to develop and implement the necessary tools and systems to manage the project. In late 1999 the DOE Manager of the Office of River Protection formed the Project Integration Office to achieve the objective of managing the efforts as a single project. The first major task, and the foundation upon which to base the development of all other tools, was the establishment of a single baseline of activities. However, defining a single scope schedule and cost was a difficult matter indeed. Work scopes were available throughout the project, but the level of detail and the integration of the activities existed primarily between working groups and individuals and not on a project-wide basis. This creates a situation where technical needs, logic flaws, resource balancing, and other similar integration needs are not elevated for management attention and resolution. It should be noted that probably 90% of the interface issues were known and being addressed. The key is simplifying the process and providing tangible assurance that the other 10% does not contain issues that can delay the project. Fortunately all of the contractors employed a common scheduling tool, which served as the basis for first communicating and then integrating baseline activities. Utilizing a powerful computer-based scheduling tool, it was soon possible to integrate the various schedules after the following was accomplished: Establishment of a scheduling specification (standardized input, coding, and approach to logic); and Clearly defined project assumptions

  17. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Golder Associates, Inc.

    2003-04-22

    result of the planning effort leading to this Master Plan, a Technical Working Group (TWG) was established that represents most, if not all, fish and wildlife agencies/interests in the subbasin. This TWG met regularly throughout the planning process to provide input and review and was instrumental in the development of this plan. Preparation of this plan included the development of a quantitative prioritization process to rank 40,000 parcels within the Urban Growth Area based on the value of fish and wildlife habitat each parcel provided. Biological and physical criteria were developed and applied to all parcels through a GIS-based prioritization model. In the second-phase of the prioritization process, the TWG provided local expert knowledge and review of the properties. In selecting the most critical areas within the Urban Growth Area for protection, this project assessed the value of fish and wildlife habitat on the Yakima River. Well-developed habitat acquisition efforts (e.g., Yakima River Basin Water Enhancement Project by the Bureau of Reclamation and Yakama Nation acquisition projects) are already underway on the Yakima River mainstem. These efforts, however, face several limitations in protection of floodplain function that could be addressed through the support of the Yakima Habitat Improvement Project. This Master Plan integrates tributary habitat acquisition efforts with those ongoing on the Yakima River to best benefit fish and wildlife in the Urban Growth Area. The parcel ranking process identified 25 properties with the highest fish and wildlife value for habitat acquisition in the Yakima Urban Area. These parcels contain important fish and wildlife corridors on Ahtanum and Wide Hollow Creeks and the Naches River. The fifteen highest-ranking parcels of the 25 parcels identified were considered very high priority for protection of fish and wildlife habitat. These 15 parcels were subsequently grouped into four priority acquisition areas. This Master Plan

  18. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  19. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  20. The Southern Forest Futures Project: technical report

    Science.gov (United States)

    David N. Wear; John G. Greis

    2013-01-01

    Please visit the Southern Forest Futures Project website for more information.The Southern Forest Futures Project provides a science-based “futuring” analysis of the forests of the 13 States of the Southeastern United States. With findings...

  1. The Influence of Water Conservancy Projects on River Network Connectivity, A Case of Luanhe River Basin

    Science.gov (United States)

    Li, Z.; Li, C.

    2017-12-01

    Connectivity is one of the most important characteristics of a river, which is derived from the natural water cycle and determine the renewability of river water. The water conservancy project can change the connectivity of natural river networks, and directly threaten the health and stability of the river ecosystem. Based on the method of Dendritic Connectivity Index (DCI), the impacts from sluices and dams on the connectivity of river network are deeply discussed herein. DCI quantitatively evaluate the connectivity of river networks based on the number of water conservancy facilities, the connectivity of fish and geographical location. The results show that the number of water conservancy facilities and their location in the river basin have a great influence on the connectivity of the river network. With the increase of the number of sluices and dams, DCI is decreasing gradually, but its decreasing range is becoming smaller and smaller. The dam located in the middle of the river network cuts the upper and lower parts of the whole river network, and destroys the connectivity of the river network more seriously. Therefore, this method can be widely applied to the comparison of different alternatives during planning of river basins and then provide a reference for the site selection and design of the water conservancy project and facility concerned.

  2. Missouri River Flood 2011 Vulnerabilities Assessment Report. Volume 2 - Technical Report

    Science.gov (United States)

    2012-10-01

    Michels at Dakota Dunes , South Dakota. ............................................................................................................... 2...91 Figure 28. Upper Hamburg Bend Levee Toe Scour...Bend Project at Dakota Dunes along Left Bank River Mile 737 ........................... 109 Figure 37. Stage Trends on the Missouri River at St

  3. Whitestone Poncelet RISEC Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hasz Consulting, LLC; Whitestone Power and Communications; CE2 Engineers

    2011-09-23

    This report covers the development of the Poncelet Kinetics RHK100 Prototype. The work was completed by Hasz Consulting, LLC; CE2 Engineers, LLC; Energetic Drives, LLC; and Applied Power and Control all operating as subcontractors to Whitestone Power and Communications during the year from October 1, 2010 to September 23, 2011. As designed, the prototype is run-of-river instream energy conversion (RISEC) system. The design is principally a three-stage undershot water wheel arranged according to the method of General Poncelet. The power train consists of an epicyclic transmission coupled to a permanent magnet generator. The electronic controls system governs the speed of the wheel and rectifies the power signal to enable the system to be integrated with infinite grid infrastructures, to operate in parallel in finite grid applications with other small power productions sources or to operate in stand-alone mode on demand.

  4. The international Chernobyl project. Technical report

    International Nuclear Information System (INIS)

    1991-01-01

    This report contains the findings of the International Chernobyl Project. Separate chapters deal with the history of the accident and the Soviet emergency measures, environmental contamination, radiation exposure of the population, health impact, and protective measures. The conclusions and recommendations of the Project are presented, and an annex gives the available data on cesium 137 and strontium 90 contamination levels in populated areas of the BSSR, the RSFSR and the UkrSSR from June/July 1989: these data were used to draw up the area contamination maps. Ref, figs and tabs

  5. Research Projects, Technical Reports and Publications

    Science.gov (United States)

    Oliger, Joseph

    1996-01-01

    The Research Institute for Advanced Computer Science (RIACS) was established by the Universities Space Research Association (USRA) at the NASA Ames Research Center (ARC) on June 6, 1983. RIACS is privately operated by USRA, a consortium of universities with research programs in the aerospace sciences, under contract with NASA. The primary mission of RIACS is to provide research and expertise in computer science and scientific computing to support the scientific missions of NASA ARC. The research carried out at RIACS must change its emphasis from year to year in response to NASA ARC's changing needs and technological opportunities. A flexible scientific staff is provided through a university faculty visitor program, a post doctoral program, and a student visitor program. Not only does this provide appropriate expertise but it also introduces scientists outside of NASA to NASA problems. A small group of core RIACS staff provides continuity and interacts with an ARC technical monitor and scientific advisory group to determine the RIACS mission. RIACS activities are reviewed and monitored by a USRA advisory council and ARC technical monitor. Research at RIACS is currently being done in the following areas: Advanced Methods for Scientific Computing High Performance Networks During this report pefiod Professor Antony Jameson of Princeton University, Professor Wei-Pai Tang of the University of Waterloo, Professor Marsha Berger of New York University, Professor Tony Chan of UCLA, Associate Professor David Zingg of University of Toronto, Canada and Assistant Professor Andrew Sohn of New Jersey Institute of Technology have been visiting RIACS. January 1, 1996 through September 30, 1996 RIACS had three staff scientists, four visiting scientists, one post-doctoral scientist, three consultants, two research associates and one research assistant. RIACS held a joint workshop with Code 1 29-30 July 1996. The workshop was held to discuss needs and opportunities in basic research in

  6. Integrated Project Control and Technical Support

    International Nuclear Information System (INIS)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-01

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage

  7. Minewater heat recovery project. Final Technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-04-01

    This report consists of three sections: (1) Design, experimental testing and performance analysis of the 20-ft long DBHE (Downhole Bundle Heat Exchanger); (2) Modified design of mine water heat exchanger; and (3) Performance tests on mine water heat exchanger. Appendices summarize design calculations, discuss the scope of the work tasks, and present a diary of the progress throughout the research and development project.

  8. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  9. LCREP genetic stock ID - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  10. LCREP catch records - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  11. LCREP prey data - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  12. LCREP chemistry and lipids - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  13. Napa River Sediment TMDL Implementation and Habitat Enhancement Project

    Science.gov (United States)

    Information about the SFBWQP Napa River Sediment TMDL Implementation and Habitat Enhancement Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  14. LCREP growth rates - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  15. Skagit IMW - Skagit River Estuary Intensively Monitored Watershed Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study evaluates system-level effects of several estuary restoration projects on juvenile Chinook salmon production in the Skagit River estuary. The monitoring...

  16. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Joo, Po Kook; Kim, Gye Ryung (and others)

    2003-06-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the subprojects from the various fields, It has been tried to make the subprojects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, TRM(Technology Road Map) is made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  17. Wind River Watershed Restoration Project; Underwood Conservation District, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    White, Jim

    2004-02-01

    The goal of the Wind River project is to preserve, protect and restore Wind River steelhead. In March, 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia as 'threatened' under the Endangered Species Act. In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical. Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery and restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative. The Wind River Project includes four cooperating agencies. Those are the Underwood Conservation District (UCD), United States Geological Service (USGS), US Forest Service (USFS), and Washington State Department of Fish & Wildlife (WDFW). Tasks include monitoring steelhead populations (USGS and WDFW), Coordinating a Watershed Committee and Technical Advisory Group (UCD), evaluating physical habitat conditions (USFS and UCD), assessing watershed health (all), reducing road sediments sources (USFS), rehabilitating riparian corridors, floodplains, and channel geometry (UCD, USFS), evaluate removal of Hemlock Dam (USFS), and promote local watershed stewardship (UCD, USFS). UCD's major efforts have included coordination of the Wind River Watershed Committee and Technical Advisory Committee (TAC), water temperature and water chemistry monitoring, riparian habitat improvement projects, and educational activities. Our coordination work enables the local Watershed Committee and TAC to function and provide essential input to Agencies, and our habitat improvement work focuses on riparian revegetation. Water chemistry and temperature data collection provide information for monitoring watershed conditions and fish habitat, and are comparable with data gathered in previous years. Water chemistry information collected on Trout Creek should, with 2 years data, determine whether pH levels make conditions

  18. Legal control of large technical projects

    International Nuclear Information System (INIS)

    Papier, H.J.

    1981-01-01

    More legal security, acceleration of court procedures, a fair consideration of the interests of the permission recipients, avoidance of any kind of political usurpation, as well as the attempts of judges not to present an amateuriser scientific-technical indepth-knowledge cannot be accomplished via Sporadic appeals with partially para-legal reservedness. This also goes for those frantic attempts to institute socalled ''norm selections'', and for efforts of attempting to influence objective rights by modifying grounds for contestation. What is needed is a legistation that, especially in the area of large industrial plants, exerts appropriate statuatory influence. So far, this has not been the case. It is up to the legislation to define permission standards, have them assessed and judged by experts, and harmonize them with the appropriate procedural rights. If this is done, the power of balance with regards to large industrial plants will be re-established. Curtailment of the lengthy process of official channels must also be considered. If a preliminary administrative procedure is already formalized, a second fact-establishing instance should be waived. (orig./HP) [de

  19. THE RELATIONSHIP BETWEEN TECHNICAL AND SOCIAL NORMS IN ENVIRONMENTAL PROJECT

    OpenAIRE

    Jasminka Lažnjak

    1992-01-01

    In the article the relationship between system of technical and system of social norms in ecological project has been considered from constructivist standpoint in sociology of technology. For adequate solution of technological problem of enviromental pollution by hydrocarbons is necessary to define beside technical also system of social norms. Sociological analysis of accidents in transportation of hydrocarbons is suggested in purpose of clear definition of responsibilities of certain social ...

  20. VIRTUAL PHILOSOPHER PROJECT: PHILOSOPHICAL, PEDAGOGICAL AND TECHNICAL ASPECTS

    Directory of Open Access Journals (Sweden)

    E. V. Kuchinov

    2017-01-01

    Full Text Available The article describes philosophical and pedagogical aspects of an idea of the ‘virtual philosopher’ project developed at creative sessions at Minin University and technically concretized during interaction with the Laboratory of Mobile Services. ‘Virtual philosopher’ is thought to deliver creative automation of routine operations; producing contingent matter for philosophical processing as well as elements of the philosophical artificial intelligence and forms of ‘artificial life’. Project implementation may lead to the creation of an unparalleled educational technology that functions on the principles of flexibility, nonlinearity, affective inclusion and gamification of the educational process. Based on specific character of problems raised, rhizomatic analysis of the philosophical communities’ requests, assessment of their technical feasibility and technical development, provisions are made on the feasibility, prospects and productivity of this project.

  1. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  2. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  3. Ice Load Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Timothy J. [DNV GL, Seattle, WA (United States); Brown, Thomas [IFC Engineering, Calgary, AB (Canada); Byrne, Alex [DNV GL, Seattle, WA (United States)

    2014-10-30

    As interest and investment in offshore wind projects increase worldwide, some turbines will be installed in locations where ice of significant thickness forms on the water surface. This ice moves under the driving forces of wind, current, and thermal effects and may result in substantial forces on bottom-fixed support structures. The North and Baltic Seas in Europe have begun to see significant wind energy development and the Great Lakes of the United States and Canada may host wind energy development in the near future. Design of the support structures for these projects is best performed through the use of an integrated tool that can calculate the cumulative effects of forces due to turbine operations, wind, waves, and floating ice. The dynamic nature of ice forces requires that these forces be included in the design simulations, rather than added as static forces to simulation results. The International Electrotechnical Commission (IEC) standard[2] for offshore wind turbine design and the International Organization for Standardization (ISO) standard[3] for offshore structures provide requirements and algorithms for the calculation of forces induced by surface ice; however, currently none of the major wind turbine dynamic simulation codes provides the ability to model ice loads. The scope of work of the project described in this report includes the development of a suite of subroutines, collectively named IceFloe, that meet the requirements of the IEC and ISO standards and couples with four of the major wind turbine dynamic simulation codes. The mechanisms by which ice forces impinge on offshore structures generally include the forces required for crushing of the ice against vertical-sided structures and the forces required to fracture the ice as it rides up on conical-sided structures. Within these two broad categories, the dynamic character of the forces with respect to time is also dependent on other factors such as the velocity and thickness of the moving ice

  4. White River Falls Fish Passage Project, Tygh Valley, Oregon : Final Technical Report, Volume III, Appendix B, Fisheries Report; Appendix C, Engineering Alternative Evaluation; Appendix D, Benefit/Cost Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon. Dept. of Fish and Wildlife; Mount Hood National Forest (Or.)

    1985-06-01

    Studies were conducted to describe current habitat conditions in the White River basin above White River Falls and to evaluate the potential to produce anadromous fish. An inventory of spawning and rearing habitats, irrigation diversions, and enhancement opportunities for anadromous fish in the White River drainage was conducted. Survival of juvenile fish at White River Falls was estimated by releasing juvenile chinook and steelhead above the falls during high and low flow periods and recapturing them below the falls in 1983 and 1984. Four alternatives to provide upstream passage for adult salmon and steelhead were developd to a predesign level. The cost of adult passage and the estimated run size of anadromous fish were used to determine the benefit/cost of the preferred alternative. Possible effects of the introduction of anadromous fish on resident fish and on nearby Oak Springs Hatchery were evaluated. This included an inventory of resident species, a genetic study of native rainbow, and the identification of fish diseases in the basin. This volume contains appendices of habitat survey data, potential production, resident fish population data, upstream passage designs, and benefit/cost calculations. (ACR)

  5. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  6. Final Technical Report. Project Boeing SGS

    Energy Technology Data Exchange (ETDEWEB)

    Bell, Thomas E. [The Boeing Company, Seattle, WA (United States)

    2014-12-31

    Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include; Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection; Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event; Improved malware detection and zero-day threat response capability; Improved ability to systematically evaluate and secure in house and vendor sourced software applications; Improved ability to continuously monitor

  7. Influence of technical maintenance measures on ecological status of agricultural lowland rivers - Systematic review and implications for river management.

    Science.gov (United States)

    Bączyk, Anna; Wagner, Maciej; Okruszko, Tomasz; Grygoruk, Mateusz

    2018-06-15

    Intensification of agriculture and ongoing urban sprawl exacerbate pressures on rivers. Small rivers in agricultural landscapes are especially exposed to excessive technical actions implemented in order to allow for harvesting river water for irrigation, draining agricultural water and receiving sewage. Regular dredging and macrophyte removal strongly interfere with the global need for preserving river biodiversity that allows agricultural lowland rivers to remain refuges for a variety of species, and-accordingly-to keep water bodies resilient for the benefit of society. In order to provide a comprehensive look at the influence of agricultural lowland river management on the ecological status of these water bodies, we conducted a literature review and a meta-analysis. For the structured literature review we selected 203 papers reflecting on the response of aquatic ecosystems to dredging and macrophyte management actions. The database of scientific contributions developed for our study consists of papers written by the authors from 33 countries (first authorship) addressing dredging, macrophyte removal, status of fish and macroinvertebrates as well as the general ecological status of lowland agricultural rivers. We revealed that 96% of the analyzed papers indicated unilateral, negative responses of aquatic ecosystems, particularly macroinvertebrates, ichthyofauna and macrophyte composition, to maintenance measures. We revealed that studies conducted in the European Union on the ecological status of rivers appeared to significantly increase in quantity after the implementation of the Water Framework Directive. Finally, we concluded that day-to-day management of lowland agricultural rivers requires revision in terms of compliance with environmental conservation requirements and the recurrent implementation of technical measures for river maintenance. Copyright © 2018 Elsevier B.V. All rights reserved.

  8. Digital projection radiography. Technical principles, image properties and potential applications

    International Nuclear Information System (INIS)

    Busch, H.P.

    1999-01-01

    The history of development of digital projection radiography as a diagnostic method is presented in a comprehensive survey. The various technical principles are explained in detail and illustrated by means of graphic figures and digital X-ray pictures. A comparative assessment of currently applied radiographic systems is given and the potential clinical applications of the method of digital projection radiography are discussed. (orig./CB) [de

  9. Integrating public information activities on a technical project

    International Nuclear Information System (INIS)

    Little, Sh. K.; Vecchiola, S.F.

    1984-01-01

    Through gradual evolution and successful performance, the WIPP Communications group has gained respect and recognition as a dual service organization that offers numerous benefits to a technical project. Westinghouse assembled a team that has successfully coordinated and encouraged an exchange of information not only with the public information realm but also as a project service and function. WIPP has combined educational services, external and employee communication and public information into one unit called ''Communications''

  10. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  11. Technical note: River modelling to infer flood management framework

    African Journals Online (AJOL)

    River hydraulic models have successfully identified the weaknesses and areas for improvement with respect to flooding in the Sarawak River system, and can also be used to support decisions on flood management measures. Often, the big question is 'how'. This paper demonstrates a theoretical flood management ...

  12. Colorado River cutthroat trout: a technical conservation assessment

    Science.gov (United States)

    Michael K. Young

    2008-01-01

    The Colorado River cutthroat trout (Oncorhynchus clarkii pleuriticus) was once distributed throughout the colder waters of the Colorado River basin above the Grand Canyon. About 8 percent of its historical range is occupied by unhybridized or ecologically significant populations. It has been petitioned for listing under the Endangered Species Act...

  13. Manhattan Project Technical Series: The Chemistry of Uranium (I)

    International Nuclear Information System (INIS)

    Rabinowitch, E. I.; Katz, J. J.

    1947-01-01

    This constitutes Chapters 11 through 16, inclusive, of the Survey Volume on Uranium Chemistry prepared for the Manhattan Project Technical Series. Chapters are titled: Uranium Oxides, Sulfides, Selenides, and Tellurides; The Non-Volatile Fluorides of Uranium; Uranium Hexafluoride; Uranium-Chlorine Compounds; Bromides, Iodides, and Pseudo-Halides of Uranium; and Oxyhalides of Uranium.

  14. Manhattan Project Technical Series: The Chemistry of Uranium (I)

    Energy Technology Data Exchange (ETDEWEB)

    Rabinowitch, E. I. [Argonne National Lab. (ANL), Argonne, IL (United States); Katz, J. J. [Argonne National Lab. (ANL), Argonne, IL (United States)

    1947-03-10

    This constitutes Chapters 11 through 16, inclusive, of the Survey Volume on Uranium Chemistry prepared for the Manhattan Project Technical Series. Chapters are titled: Uranium Oxides, Sulfides, Selenides, and Tellurides; The Non-Volatile Fluorides of Uranium; Uranium Hexafluoride; Uranium-Chlorine Compounds; Bromides, Iodides, and Pseudo-Halides of Uranium; and Oxyhalides of Uranium.

  15. The Hanford Environmental Dose Reconstruction (HEDR) Project: Technical approach

    International Nuclear Information System (INIS)

    Napier, B.A.; Freshley, M.D.; Gilbert, R.O.; Haerer, H.A.; Morgan, L.G.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    Historical measurements and current assessment techniques are being combined to estimate potential radiation doses to people from radioactive releases to the air, the Columbia River, soils, and ground water at the Hanford Site since 1944. Environmental contamination from these releases has been monitored, at varying levels of detail, for 45 yr. Phase I of the Hanford Environmental Reconstruction Project will estimate the magnitude of potential doses, their areal extends, and their associated uncertainties. The Phase I study area comprises 10 counties in eastern Washington and northern Oregon, within a 100-mi radius of the site, including a stretch of the Columbia River that was most significantly affected. These counties contain a range of projected and measured contaminant levels, environmental exposure pathways, and population groups. Phase I dose estimates are being developed for the periods 1944 through 1947 for air pathways and 1964 through 1966 for river pathways. Important radionuclide/pathway combinations include fission products, such as 131 I, in milk for early atmospheric releases and activation products, such as 32 P and 65 Zn, in fish for releases to the river. Potential doses range over several orders of magnitude within the study area. We will expand the time periods and study are in three successive phases, as warranted by results of Phase I

  16. Hanford and Savannah River Site Programmatic and Technical Integration

    International Nuclear Information System (INIS)

    Ramsey, William Gene

    2013-01-01

    Abstract only. The Hanford Site and the Savannah River Site (SRS) were the primary plutonium production facilities within the U.S. nuclear weapons complex. Radioactive wastes were generated as part of these missions and are stored in similar fashion. The majority of radioactivity maintained by the two sites is located in underground carbon steel tanks in the physical form of supernatant, saltcake, or sludge. Disposition of SRS tank waste is ongoing by converting it into glass (pathway for sludge and radionuclides separated from supernatant or dissolved saltcake) or cement (pathway for the decontaminated supernatant and dissolved saltcake). Tank closure activity has also begun at SRS and will continue for the duration of mission. The Hanford tank waste inventory is roughly 2/3rds larger than SRS's by volume- but nominally half the radioactivity. The baseline disposition path includes high-level and low-activity waste vitrification with separate disposition of contact-handled transuranic tank waste. Retrieval of tank waste from aging single shell tanks (SSTs) into double-shell tanks (DSTs) is currently ongoing. As vitrification commences later this decade, Hanford will be in a similar operations mode as SRS. Site integration is increasing as the missions align. The ongoing integration is centered on key issues that impact both sites- regardless of mission timeframe. Three recent workshop exchanges have been held to improve communication with the primary intent of improving operations and technical work organization. The topics of these workshops are as follows: DST space utilization, optimization, and closure; Waste Feed Qualification; and, Cementitious Waste Forms. Key goals for these and future exchanges include aligning research and technology, preparing for joint initiatives (to maximize budgetary value for the customer), and reviewing lessons learned. Each site has played a leading role in the development of technology and operational practices that can be used

  17. Combining integrated river modelling and agent based social simulation for river management; The case study of the Grensmaas project

    NARCIS (Netherlands)

    Valkering, P.; Krywkow, Jorg; Rotmans, J.; van der Veen, A.; Douben, N.; van Os, A.G.

    2003-01-01

    In this paper we present a coupled Integrated River Model – Agent Based Social Simulation model (IRM-ABSS) for river management. The models represent the case of the ongoing river engineering project “Grensmaas”. In the ABSS model stakeholders are represented as computer agents negotiating a river

  18. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

  19. Oregon Trust Agreement Planning Project : Potential Mitigations to the Impacts on Oregon Wildlife Resources Associated with Relevant Mainstem Columbia River and Willamette River Hydroelectric Projects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-10-01

    A coalition of the Oregon wildlife agencies and tribes (the Oregon Wildlife Mitigation Coalition) have forged a cooperative effort to promote wildlife mitigation from losses to Oregon wildlife resources associated with the four mainstream Columbia River and the eight Willamette River Basin hydroelectric projects. This coalition formed a Joint Advisory Committee, made up of technical representatives from all of the tribes and agencies, to develop this report. The goal was to create a list of potential mitigation opportunities by priority, and to attempt to determine the costs of mitigating the wildlife losses. The information and analysis was completed for all projects in Oregon, but was gathered separately for the Lower Columbia and Willamette Basin projects. The coalition developed a procedure to gather information on potential mitigation projects and opportunities. All tribes, agencies and interested parties were contacted in an attempt to evaluate all proposed or potential mitigation. A database was developed and minimum criteria were established for opportunities to be considered. These criteria included the location of the mitigation site within a defined area, as well as other criteria established by the Northwest Power Planning Council. Costs were established for general habitats within the mitigation area, based on estimates from certified appraisers. An analysis of the cost effectiveness of various types of mitigation projects was completed. Estimates of operation and maintenance costs were also developed. The report outlines strategies for gathering mitigation potentials, evaluating them, determining their costs, and attempting to move towards their implementation.

  20. Technical modifications and management innovations in exporting nuclear reactor projects

    International Nuclear Information System (INIS)

    Mao Xiaoming; Qin Xijiu; Ding Hu; Xue Zhaoqun; Wen Shengjun

    2009-01-01

    As a main channel for the foreign economic cooperation of China nuclear industry, China Zhongyuan Engineering Corporation (CZEC) has been constantly engaged in technical modifications and management innovations in its exporting nuclear reactor projects. In the implementation of heavy water research reactor contract in Algeria, CZEC had established a complete and adequate design standards system in compliance with the international standards, and made significant modifications to the reference reactor in the aspects of reactor power and reactor safety, solved quite some technical issues which-affected the reactor technical performance. The modifications and improvements enabled the technical parameters, safety features, reactor multipurpose application to attain to the advanced level in the world. In the 300 MWe PWR NPPs in Pakistan, safety features had been updated in line with upgrading regulatory requisites. The design philosophy and technology application demonstrated CZEC' s creation and innovation on basis of constant safety enhancement of nuclear power projects. Efforts had also been made by CZEC' s creation and innovation on basis of constant safety enhancement of nuclear power projects. Efforts had also been made by CZEC in promoting China made equipment items and components exportation. (authors)

  1. THE RELATIONSHIP BETWEEN TECHNICAL AND SOCIAL NORMS IN ENVIRONMENTAL PROJECT

    Directory of Open Access Journals (Sweden)

    Jasminka Lažnjak

    1992-12-01

    Full Text Available In the article the relationship between system of technical and system of social norms in ecological project has been considered from constructivist standpoint in sociology of technology. For adequate solution of technological problem of enviromental pollution by hydrocarbons is necessary to define beside technical also system of social norms. Sociological analysis of accidents in transportation of hydrocarbons is suggested in purpose of clear definition of responsibilities of certain social actors and for modification of existing laws for enviromental protection (the paper is published in Croatian.

  2. Modifications to River Protection Project (RPP) Level -0 Logic

    International Nuclear Information System (INIS)

    SEEMAN, S.E.

    2000-01-01

    The following modifications were made to the River Protection Project Level-0 logic in going from Rev. I to Rev. 2. The first change was the change to the heading at the top of the drawing: ''TWRS Program Logic'' to ''River Protection Project Mission Logic''. Note that purely format changes (e.g., fonts, location of boxes, date format, addition of numbers to ''ghost'' boxes) are not discussed. However, the major format change was to show DOE-BNFL Inc. Interface Control Documents (ICDs) on the logic

  3. SUPPLEMENTAL COLUMBIA RIVER PROTECTION ACTIVITIES AT THE DEPARTMENT OF ENERGY HANFORD SITE 2008 TECHNICAL REVIEW

    Energy Technology Data Exchange (ETDEWEB)

    Looney, B; Dawn S. Kaback, D; Eugene L. LeBoeuf, E; Joe Rossabi, J; Karen L. Skubal, K; David L. Cocke, D; Paul C. Deutsch, P

    2008-09-30

    Beginning in 2006, the US Department of Energy (DOE) supported nine applied research projects to improve the protection of the Columbia River and mitigate the impacts of Hanford Site groundwater. These projects were funded through a supplemental Congressional budget allocation, and are now in various stages of completion in accordance with the research plans. The DOE Office of Environmental Management Groundwater and Soil Cleanup Technologies (EM-22) sponsored a technical peer review meeting for these projects in Richland WA, July 28-31, 2008. The overall objective of the peer review is to provide information to support DOE decisions about the status and potential future application of the various technologies. The charge for the peer review panel was to develop recommendations for each of the nine 'technologies'. Team members for the July 2008 review were Brian Looney, Gene LeBoeuf, Dawn Kaback, Karen Skubal, Joe Rossabi, Paul Deutsch, and David Cocke. Previous project reviews were held in May 2007 and March-May of 2006. The team used the following four rating categories for projects: (a) Incorporate the technology/strategy in ongoing and future EM activities; (b) Finish existing scope of applied research and determine potential for EM activities when research program is finished; (c) Discontinue current development activities and do not incorporate technology/strategy into ongoing and future EM activities unless a significant and compelling change in potential viability is documented; and (d) Supplement original funded work to obtain the data needed to support a DOE decision to incorporate the technology into ongoing and future EM activities. The supplemental funding portfolio included two projects that addressed strontium, five projects that addressed chromium, one project that addressed uranium and one project that addressed carbon tetrachloride. The projects ranged from in situ treatment methods for immobilizing contaminants using chemical

  4. River Protection Project Technology and Innovation Roadmap.

    Energy Technology Data Exchange (ETDEWEB)

    Reid, D. S. [Hanford Site (HNF), Richland, WA (United States); Wooley, T. A. [Hanford Site (HNF), Richland, WA (United States); Kelly, S. E. [Hanford Site (HNF), Richland, WA (United States)

    2017-08-14

    The Technology and Innovation Roadmap is a planning tool for WRPS management, DOE ORP, DOE EM, and others to understand the risks and technology gaps associated with the RPP mission. The roadmap identifies and prioritizes technical areas that require technology solutions and underscores where timely and appropriate technology development can have the greatest impact to reduce those risks and uncertainties. The roadmap also serves as a tool for determining allocation of resources.

  5. The Effect of Technical Assistance on Involvement and Use: The Case of a Research, Evaluation, and Technical Assistance Project

    Science.gov (United States)

    Roseland, Denise; Volkov, Boris B.; Callow-Heusser, Catherine

    2011-01-01

    In contrast to typical National Science Foundation program evaluations, the Utah State Math Science Partnership-Research, Evaluation and Technical Assistance Project (MSP-RETA) provided technical assistance (TA) in two forms: direct TA for up to 10 projects a year, and professional development sessions for a larger number of project staff. Not…

  6. Hydropower in Hawaii: Developing the Wailuku River project

    International Nuclear Information System (INIS)

    Barnes, M.J.

    1993-01-01

    When the 10-MW Wailuku River Hydroelectric Project begins operating this summer, the island of Hawaii will reduce its dependence on oil. The project is illustrative of what must be done to add to the electricity supply and, at the same time, to protect the environment. The Wailuku project is the first hydro plant to be developed in Hawaii in more than 50 years and is the largest hydro facility ever built in the state. The project is being developed by Wailuku River Hydroelectric Power Co., a wholly owned subsidiary of Synergics, Inc. Hawaii Electric Light Company Inc. (HELCO) will buy the electricity generated at the project for 30 years on an as-delivered basis at its avoided cost rate, now approximately 6.71 cents per kilowatt-hour, the floor rate in the contract. The Wailuku endeavor receives rave reviews form the mayor of Hilo, the president of the utility, and local residents. The project demanded a high degree of sensitivity to environmental issues and the uniqueness of the Hawaiian culture and island setting, according to Wayne Rogers, president of Wailuku River Hydro. From the conception of this project, we have worked closely with state and local interests and have been committed to following Hawaii's plans for land use and environmentally responsible energy development

  7. 77 FR 13971 - Regulated Navigation Area; MBTA Saugus River Railroad Drawbridge Rehabilitation Project, Saugus...

    Science.gov (United States)

    2012-03-08

    ... waterside restaurants), and vessels who intend to transit in the Saugus River beneath the MBTA Saugus River... standards are technical standards (e.g., specifications of materials, performance, design, or operation...

  8. Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  9. Yucca Mountain Site Characterization Project Technical Data Catalog (quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated December 31, 1992, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1993

  10. Yucca Mountain Site Characterization Project Technical Data Catalog

    International Nuclear Information System (INIS)

    1992-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear, Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  11. Yucca Mountain Site Characterization Project technical data catalog

    International Nuclear Information System (INIS)

    1992-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  12. Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  13. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million

  14. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  15. The technical status of the supersara project at its termination

    International Nuclear Information System (INIS)

    Markovina, A.; Randles, J.

    1987-01-01

    On March 10th 1983 the Council of Ministers of the European Community adopted the decision to abandon the SuperSARA project. In the frame of this decision, the Management of the SuperSARA project formulated the guidelines to close the project, which included the preparation of the present final report. This report presents the final status of the project, which means that it reflects the situation in March 1983, with a few updates introduced shortly afterwards in conformity with the safety requirements which were being revised at that time. The aim of this report is to give a general description of activities which were carried on to implement the experimental programme and to illustrate some important achievements reached in specific areas. In addition, it is also intended to provide the access key to the documentation which was produced in the past years, so as to make the most significant technical material easily available for any possible future use

  16. Climate Projections and Drought: Verification for the Colorado River Basin

    Science.gov (United States)

    Santos, N. I.; Piechota, T. C.; Miller, W. P.; Ahmad, S.

    2017-12-01

    The Colorado River Basin has experienced the driest 17 year period (2000-2016) in over 100 years of historical record keeping. While the Colorado River reservoir system began the current drought at near 100% capacity, reservoir storage has fallen to just above 50% during the drought. Even though federal and state water agencies have worked together to mitigate the impact of the drought and have collaboratively sponsored conservation programs and drought contingency plans, the 17-years of observed data beg the question as to whether the most recent climate projections would have been able to project the current drought's severity. The objective of this study is to analyze observations and ensemble projections (e.g. temperature, precipitation, streamflow) from the CMIP3 and CMIP5 archive in the Colorado River Basin and compare metrics related to skill scores, the Palmer Drought Severity Index, and water supply sustainability index. Furthermore, a sub-ensemble of CMIP3/CMIP5 projections, developed using a teleconnection replication verification technique developed by the author, will also be compared to the observed record to assist in further validating the technique as a usable process to increase skill in climatological projections. In the end, this study will assist to better inform water resource managers about the ability of climate ensembles to project hydroclimatic variability and the appearance of decadal drought periods.

  17. The NIOSH Radiation Dose Reconstruction Project: managing technical challenges.

    Science.gov (United States)

    Moeller, Matthew P; Townsend, Ronald D; Dooley, David A

    2008-07-01

    Approximately two years after promulgation of the Energy Employees Occupational Illness Compensation Program Act, the National Institute for Occupational Safety and Health Office of Compensation and Analysis Support selected a contractor team to perform many aspects of the radiation dose reconstruction process. The project scope and schedule necessitated the development of an organization involving a comparatively large number of health physicists. From the initial stages, there were many technical and managerial challenges that required continuous planning, integration, and conflict resolution. This paper identifies those challenges and describes the resolutions and lessons learned. These insights are hopefully useful to managers of similar scientific projects, especially those requiring significant data, technical methods, and calculations. The most complex challenge has been to complete defensible, individualized dose reconstructions that support timely compensation decisions at an acceptable production level. Adherence to applying claimant-favorable and transparent science consistent with the requirements of the Act has been the key to establishing credibility, which is essential to this large and complex project involving tens of thousands of individual stakeholders. The initial challenges included garnering sufficient and capable scientific staff, developing an effective infrastructure, establishing necessary methods and procedures, and integrating activities to ensure consistent, quality products. The continuing challenges include maintaining the project focus on recommending a compensation determination (rather than generating an accurate dose reconstruction), managing the associated very large data and information management challenges, and ensuring quality control and assurance in the presence of an evolving infrastructure. The lessons learned concern project credibility, claimant favorability, project priorities, quality and consistency, and critical

  18. River Protection Project FY 2000 Multi Year Work Plan Summary

    International Nuclear Information System (INIS)

    LENSEIGNE, D.L.

    1999-01-01

    The River Protection Project (RPP), formerly the Tank Waste Remediation System (TWRS), is a major part of the U.S. Department of Energy's (DOE) Office of River Protection (ORP). The ORP was established as directed by Congress in Section 3139 of the Strom Thurmond National Defense Authorization Act for Fiscal Year (FY) 1999. The ORP was established to elevate the reporting and accountability for the RPP to the DOE-Headquarters level. This was done to gain Congressional visibility and obtain support for a major $10 billion high-level liquid waste vitrification effort

  19. Malheur River Wildlife Mitigation Project : 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kesling, Jason; Abel, Chad; Schwabe, Laurence

    2009-01-01

    In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

  20. An evaluation of the embankment project on the Pripyat river

    International Nuclear Information System (INIS)

    Lepicard, S.

    2000-01-01

    On considering only the economical and radiological criteria, and on the base of available information and adopted hypothesis, the benefits expected from the building project of an embankment on the Pripyat river lead to just compensate the building and maintenance costs estimated for this project. Nevertheless, taking into account the expected positive effects on different sectors of economy, the project of an embankment of Chernobyl, initiated more than twelve years after the accident, will be, in a long term perspective, an efficient mean to improve the radiations situation and the life conditions for the Ukraine populations. (N.C.)

  1. Technical descriptions of Hudson River electricity generating stations

    International Nuclear Information System (INIS)

    Hutchison, J.B.

    1988-01-01

    Six fossil-fueled and one nuclear electricity generating plants are sited along the Hudson River estuary between kilometers 8 and 228, measured from the river mouth. Their aggregate rated capacity is 5,798 MW of electricity; operating at that capacity they would withdraw cooling water from the river at the rate of 1.5 x 10 to the 9th power cu m/d and reject heat at the rate of 155 x 10 to the 9th power kcal/d. Three of these plants, the fossil-fueled Roseton and Bowline and the nuclear Indian Point facilities; account for 75% of total rated capacity, 62% of maximum water withdrawal, and 79% of potential heat rejection. These three plants and a proposed pumped-storage facility at Cornwall, all sited between km 60 and 106, were the focus of environmental litigation. The Indian Point plant normally operates at 100% generation capacity; the other plants may experience daily operating load changes that vary from approximately 50% to 100% of total generation capacity, depending on system electrical demand or economic considerations. All plants experience periodic unscheduled outages for repairs. 6 refs., 7 figs

  2. Admiralty Inlet Pilot Tidal Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig [Public Utility District No. 1 of Snohomish County, Everett, WA (United States)

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  3. Technical project for a new water purification solution

    Directory of Open Access Journals (Sweden)

    Toma Adina

    2018-01-01

    Full Text Available This research is part of the RO-BG Cross-Border Cooperation Program, project “CLEANDANUBE”, MIS-ETC 653, which has finalised by providing a common strategy to prevent the Danube’s pollution technological risks with oil and oil products. This paper presents a new sustainable water purification solution. A short introduction will be offered and an overview regarding the research and new methods to greening the waste is provided. The theoretical aspects of the centrifugal separation phenomenon are studied and the preliminary project bases were established. The paper conveys the possible constructive variations and the technological implications of those. Ultimately, the technical project for a new water purification solution and conclusions with critical points encountered during the designing phase are presented.

  4. 77 FR 45653 - Yakima River Basin Conservation Advisory Group; Yakima River Basin Water Enhancement Project...

    Science.gov (United States)

    2012-08-01

    ... Basin Conservation Advisory Group, Yakima River Basin Water Enhancement Project, established by the... Water Conservation Program. DATES: The meeting will be held on Tuesday, August 21, 2012, from 1 p.m. to... the implementation of the Water Conservation Program, including the applicable water conservation...

  5. Alligator Rivers Analogue project. Geochemical Data Bases

    International Nuclear Information System (INIS)

    Bennett, D.G.; Read, D.

    1992-01-01

    The Koongarra uranium deposit in the Northern Territory of Australia is being studied to evaluate the processes involved in the geochemical alteration of the ore body and the formation of the uranium dispersion fan. A broad range of research is being undertaken into the geochemistry and hydrology of the site with the aim of understanding the transport of radionuclides through the system. During the project a range of geochemical and hydrogeochemical models have been developed to account for measured data from the site and with which to predict site evolution. The majority of these models are based on the premise of thermodynamic chemical equilibrium and employ fundamental thermodynamic data to characterise the chemistry of the system. From the differences which exist between the thermodynamic data bases (Appendices I and II) it is possible to gain a view of the level of uncertainty associated with thermodynamic data in each set of calculations. This report gives a brief introduction to the geochemical processes underlying the models, and details the equations used to quantify the more common of these processes (e.g. aqueous speciation and mineral solubility). A description is given of the computer codes (EQ3/6, PHREEQE, MINTEQ) most commonly used during the project for geochemical modelling. Their key features are highlighted and comparisons made. It is concluded that the degree of uncertainty in geochemical modelling studies arising as a result of using one code rather than another is relatively insignificant when compared to that related to differences in the underlying data bases. 73 refs., 3 figs

  6. Office of Crystalline Repository Development FY 83 technical project plan

    International Nuclear Information System (INIS)

    1983-03-01

    The technical plan for FY 83 activities of the Office of Crystalline Repository Development is presented in detail. Crystalline Rock Project objectives are discussed in relation to the National Waste Terminal storage (NWTS) program. The plan is in full compliance with requirements mandated by the Nuclear Waste Policy Act of 1982. Implementation will comply with the requirements and criteria set forth in the Nuclear Regulatory Commission regulations (10 CFR 60) and the Environmental Protection Agency standard (40 CFR 191). Technical approaches and the related milestones and schedules are presented for each of the Level 3 NWTS work Breakdown Structure Tasks. These are: Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities and Excavations, Land Acquisition, and Program Management

  7. Recommendations to the Technical Steering Panel regarding approach for estimating individual radiation doses resulting from releases of radionuclides to the Columbia River

    International Nuclear Information System (INIS)

    Napier, B.A.; Brothers, A.J.

    1992-07-01

    At the direction of the Technical Steering Panel (TSP) of the Hanford Environmental Dose Reconstruction (HEDR) Project, Battelle staff have reviewed and analyzed available data regarding possible historical radiation doses to individuals resulting from radionuclide releases to the Columbia River. The objective of this review was to recommend to the TSP the spatial and temporal scope and level of effort on Columbia River work to most effectively extend work performed in Phase I of the project (PNL 1991a, PNL 1991b) to meet the project objectives. A number of options were analyzed. Four stretches of the Columbia River and adjacent Pacific coastal waters were defined and investigated for four time periods. Radiation doses arising from ten potentially major exposure pathways were evaluated for each of the time/location combinations, and several alternative methods were defined for estimating the doses from each pathway. Preliminary cost estimates were also developed for implementing dose estimation activities for each of the possible combinations

  8. Wabash River coal gasification repowering project -- first year operation experience

    Energy Technology Data Exchange (ETDEWEB)

    Troxclair, E.J. [Destec Energy, Inc., Houston, TX (United States); Stultz, J. [PSI Energy, Inc., West Terre Haute, IN (United States)

    1997-12-31

    The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Destec Energy, Inc. and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal gasification combined cycle plant in the world. This Demonstration Project has allowed PSI Energy to repower a 1950`s vintage steam turbine and install a new syngas fired combustion turbine to provide 262 MW (net) of electricity in a clean, efficient manner in a commercial utility setting while utilizing locally mined high sulfur Indiana bituminous coal. In doing so, the Project is also demonstrating some novel technology while advancing the commercialization of integrated coal gasification combined cycle technology. This paper discusses the first year operation experience of the Wabash Project, focusing on the progress towards achievement of the demonstration objectives.

  9. Final Technical Report, Wind Generator Project (Ann Arbor)

    Energy Technology Data Exchange (ETDEWEB)

    Geisler, Nathan [City of Ann Arbor, MI (United States)

    2017-03-20

    A Final Technical Report (57 pages) describing educational exhibits and devices focused on wind energy, and related outreach activities and programs. Project partnership includes the City of Ann Arbor, MI and the Ann Arbor Hands-on Museum, along with additional sub-recipients, and U.S. Department of Energy/Office of Energy Efficiency and Renewable Energy (EERE). Report relays key milestones and sub-tasks as well as numerous graphics and images of five (5) transportable wind energy demonstration devices and five (5) wind energy exhibits designed and constructed between 2014 and 2016 for transport and use by the Ann Arbor Hands-on Museum.

  10. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December

  11. THE PROFESSIONAL QUALIFICATION SOLIDARY EXTENSION PROJECT AT ELECTRONICS: TECHNICAL AUXILIAR

    Directory of Open Access Journals (Sweden)

    Glaucio Lopes Ramos

    2009-10-01

    Full Text Available This paper has the objective to present the extension course “professional qualification solidary extension project at electronics: technical auxiliar” in the Electrical Engineering course in the University Center of Belo Horizonte, as a professional qualification activity that make possible to young, adults and elderly people from poor communities the social inclusion and an opportunity to improve their access to the labor market. The course is part of extension program of Uni-BH, UniTrabalho e Renda, that is offered since 2006. The responsible for the course are professors and students of the Electrical Engineering course, and an electricity project is also offered. This paper presents the results of an evaluation that is made for the students at the beginning and at the end of the course and showed that the concepts had been assimilated by the students and the expectation of them related to the insertion at labor market is also improved.

  12. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  13. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  14. The Role of Anthropogenic Stratigraphy in River Restoration Projects

    Science.gov (United States)

    Evans, J. E.; Webb, L. D.

    2012-12-01

    As part of a river restoration project and removal of a low-head dam on the Ottawa River (northwestern Ohio and southeastern Michigan) in 2007, a longer-term project was initiated to assess anthropogenic changes of the Ottawa River fluvial system. A composite stratigraphic section 4.5 m in length was constructed by stratigraphic correlation from three trenches up to 2.5 m in depth and 14 vibracores up to 2.5 m in length, all within a small region (tires, intact or pieces of glass bottles, and one horizon of displaced railroad ties. Age control for the composite section is provided by 4 14C dates, 6 OSL dates, and one bottle with a date stamp. Two prominent flood horizons are indicated in multiple trenches or cores, and identified as the historic floods of 1913 and 1959. The data show the following major changes in the fluvial system over time: (1) prior to approximately 5 Ka, the river system was transporting mineral-rich sediment and formed meandering point-bar sequences approximately 1.5 m thick; (2) between approximately 5 Ka and 200 YBP, the river system was transporting organic-rich sediment (i.e., blackwater stream) bordered by riparian wetlands accumulating peat (part of the regional "Great Black Swamp" discovered by settlers from eastern North America); (3) between approximately 200 YBP and the early 1960s the river system was transporting mineral-rich sediment (i.e., brownwater stream), probably sourced from extensive land clearance for agriculture, which backfilled and overtopped the previous riparian wetlands and produced an series of thin channel fills interpreted as rapidly shifting avulsional channels; (4) since the early 1960s, sediment supply has exceeded sediment conveyance capacity, leading to vertical aggradation of approximately 1.7 m, creating the fill-terrace morphology evident today; and (5) overlapping with the previous stage, channel incision and lateral channel migration has produced a fluvial system dominated by bank erosion, logjams due

  15. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, Anne

    2007-01-01

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory?s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  16. A River Model Intercomparison Project in Preparation for SWOT

    Science.gov (United States)

    David, C. H.; Andreadis, K.; Famiglietti, J. S.; Beighley, E.; Boone, A. A.; Yamazaki, D.; Paiva, R. C. D.; Fleischmann, A. S.; Collischonn, W.; Fisher, C. K.; Kim, H.; Biancamaria, S.

    2017-12-01

    The Surface Water and Ocean Topography (SWOT) mission is currently scheduled to launch at the beginning of next decade. SWOT is expected to retrieve unprecedented measurements of water extent, elevation, and slope in the largest terrestrial water bodies. Such potential transformative information motivates the investigation of our ability to ingest the associated data into continental-scale models of terrestrial hydrology. In preparation for the expected SWOT observations, an inter-comparison of continental-scale river models is being performed. This comparison experiment focuses on four of the world's largest river basins: the Amazon, the Mississippi, the Niger, and the Saint-Lawrence. This ongoing project focuses on two main research questions: 1) How can we best prepare for the expected SWOT continental to global measurements before SWOT even flies?, and 2) What is the added value of including SWOT terrestrial measurements into global hydro models for enhancing our understanding of the terrestrial water cycle and the climate system? We present here the results of the second year of this project which now includes simulations from six numerical models of rivers over the Mississippi and sheds light on the implications of various modeling choices on simulation quality as well as on the potential impact of SWOT observations.

  17. Understanding Project Based Production through Socio-technical Modularity

    DEFF Research Database (Denmark)

    Thuesen, Christian Langhoff

    This paper develops an approach for understanding Project Based Production. This form of production is characterized by unique deliverables, high complexity, high value, high risk, profound uncertainty and many stakeholders and is increasingly important the postmodern society. Common to the pract......This paper develops an approach for understanding Project Based Production. This form of production is characterized by unique deliverables, high complexity, high value, high risk, profound uncertainty and many stakeholders and is increasingly important the postmodern society. Common...... to the practices of PBP and other production practices is the goal of balancing the dilemma between creativity and productivity. In response to industrialized production, the concept of modularity gained popularity for addressing this dilemma by exploring product, process and organization structures. However...... with the starting point in system theory and a strong bias towards industrial production, the predominant understanding of modularity faces difficulty in explaining practices of Project Based Production in both social – technical and dynamic – stable aspects. Illustrated by a case the paper addresses this gap...

  18. Wind River Watershed Project; 1998 Annual Report; Volume II

    International Nuclear Information System (INIS)

    Connolly, Patrick J.

    1999-01-01

    The authors report here their on-ground restoration actions. Part 1 describes work conducted by the Underwood Conservation District (UCD) on private lands. This work involves the Stabler Cut-Bank project. Part 2 describes work conducted by the U.S. Forest Service. The Stabler Cut-Bank Project is a cooperative stream restoration effort between Bonneville Power Administration (BPA), the UCD, private landowners, the U.S. Forest Service (USFS), and the U.S. Fish and Wildlife Service (USFWS). The Stabler site was identified by UCD during stream surveys conducted in 1996 as part of a USFWS funded project aimed at initiating water quality and habitat restoration efforts on private lands in the basin. In 1997 the Wind River Watershed Council selected the project as a top priority demonstration project. The landowners were approached by the UCD and a partnership developed. Due to their expertise in channel rehabilitation, the Forest Service was consulted for the design and assisted with the implementation of the project. A portion of the initial phase of the project was funded by USFWS. However, the majority of funding (approximately 80%) has been provided by BPA and it is anticipated that additional work that is planned for the site will be conducted with BPA funds

  19. Columbia River: Terminal fisheries research project. 1994 Annual report

    Energy Technology Data Exchange (ETDEWEB)

    Hirose, P.; Miller, M.; Hill, J.

    1996-12-01

    Columbia River terminal fisheries have been conducted in Youngs Bay, Oregon, since the early 1960`s targeting coho salmon produced at the state facility on the North Fork Klaskanine River. In 1977 the Clatsop County Economic Development Council`s (CEDC) Fisheries Project began augmenting the Oregon Department of Fish and Wildlife production efforts. Together ODFW and CEDC smolt releases totaled 5,060,000 coho and 411,300 spring chinook in 1993 with most of the releases from the net pen acclimation program. During 1980-82 fall commercial terminal fisheries were conducted adjacent to the mouth of Big Creek in Oregon. All past terminal fisheries were successful in harvesting surplus hatchery fish with minimal impact on nonlocal weak stocks. In 1993 the Northwest Power Planning Council recommended in its` Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin. The findings of the initial year of the study are included in this report. The geographic area considered for study extends from Bonneville Dam to the river mouth. The initial year`s work is the beginning of a 2-year research stage to investigate potential sites, salmon stocks, and methodologies; a second 3-year stage will focus on expansion in Youngs Bay and experimental releases into sites with greatest potential; and a final 5-year phase establishing programs at full capacity at all acceptable sites. After ranking all possible sites using five harvest and five rearing criteria, four sites in Oregon (Tongue Point, Blind Slough, Clifton Channel and Wallace Slough) and three in Washington (Deep River, Steamboat Slough and Cathlamet Channel) were chosen for study.

  20. Independent Technical Review of In-Tank Precipitation (ITP) at the Savannah River Site

    International Nuclear Information System (INIS)

    1993-06-01

    An Independent Technical Review of In-Tank Precipitation (ITP) and Extended Sludge Processing (ESP) at the Savannah River Site (SRS) was carried out in March, 1993. The review focused on ITP/ESP equipment and chemical processes, integration of ITP/ESP within the High Level Waste (HLW) and Defense Waste Processing Facility (DWPF) systems, and management and regulatory concerns. Following the ITR executive summary, this report includes: Chapter I--summary assessment; Chapter II--recommendations; and Chapter III--technical evaluations

  1. Technical data management at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Statler, J.; Newbury, C.M.; Heitland, G.W.

    1992-01-01

    The Department of Energy/Office of Civilian Radioactive waste Management (DOE/OCRWM) is responsible for the characterization of Yucca Mountain, Nevada, to determine its potential as a site of a high-level radioactive waste repository. The characterization of Yucca Mountain encompasses many diverse investigations, both onsite and in laboratories across the country. Investigations are being conducted of the geology, hydrology, mineralogy, paleoclimate, geotechnical properties, and archeology of the area, to name a few. Effective program management requires that data from site investigations be processed, interpreted and disseminated in a timely manner to support model development and validation, repository design, and performance assessment. The Program must also meet regulatory requirements for making the technical data accessible to a variety of external users throughout the life of the Project. Finally, the DOE/OCRWM must make available the data or its description and access location available for use in support of the license application and supporting documentation. To accomplish these objectives, scientific and engineering data, generated by site characterization activities, and technical data, generated by environmental and socioeconomic impact assessment activities, must be systematically identified, cataloged, stored and disseminated in a controlled manner

  2. Guanacaste Geothermal Project. Technical prefeasibility report. Annex E. Geohydrology

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    This report is the fifth of six annexes to the Summary Report on the First Phase of the Guanacaste Geothermal Project. The studies covered an area of 500 km/sup 2/ on the SW flanks of the Rincon de la Vieja and Miravalles volcanoes of the Guanacaste Volcanic Range in NW Costa Rica, and were aimed at locating zones of high geothermal gradient, and reconstruction of the stratigraphic column. An estimate was made of the annual and low-water mark water reserves. Balances were also made for each basin taking into consideration precipitation, evapo-transpiration, and runoff. Determinations were also made of effluent and influent stream, recharge, and deep water circulation zones, and water tables. An underground flow pattern was observed, extending from the volcanic massifs where recharge takes place, to the plains near the Panamerican Highway. Using silica, specific conductivity, and chlorides as natural tracers, it was concluded that the underground and surface drainage patterns generally coincide. In the area around the Miravalles volcano, a zone was found near the township of Guayabal where seepage of deep waters appears to take place, showing high silica and chloride contents (more than 150 and 50 ppM respectively), and high conductivity (more than 500 mhos-cm). Springs with low mineral content, which could be associated with shallow circulation waters, are also present in this zone. This could be indicative of the existence of two horizons, a cold one above and a hot one below, separated by an impermeable layer. Another instance of seepage of deep waters is observed in the zone around the township of Salitral de Bagaces and the Aguas Calientes River. In the northeastern part of the area under study, it was observed that the underground drainage pattern conforms to the surface drainage of the Salitral and Tizate rivers.

  3. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project

  4. Defense waste processing facility project at the Savannah River Plant

    International Nuclear Information System (INIS)

    Baxter, R.G.; Maher, R.; Mellen, J.B.; Shafranek, L.F.; Stevens, W.R. III.

    1984-01-01

    The Du Pont Company is building for the Department of Energy a facility to vitrify high-level waste at the Savannah River Plant near Aiken, South Carolina. The Defense Waste Processing Facility (DWPF) will solidify existing and future radioactive wastes produced by defense activities at the site. At the present time engineering and design are 45% complete, the site has been cleared, and startup is expected in 1989. This paper will describe project status as well as features of the design. 9 figures

  5. Snake River Sockeye Salmon Captive Broodstock Program Hatchery Element : Project Progress Report 2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Baker, Dan J.; Heindel, Jeff A.; Green, Daniel G.; Kline, Paul A.

    2008-12-17

    Numbers of Snake River sockeye salmon Oncorhynchus nerka have declined dramatically in recent years. In Idaho, only the lakes of the upper Salmon River (Sawtooth Valley) remain as potential sources of production (Figure 1). Historically, five Sawtooth Valley lakes (Redfish, Alturas, Pettit, Stanley, and Yellowbelly) supported sockeye salmon (Bjornn et al. 1968; Chapman et al. 1990). Currently, only Redfish Lake receives a remnant anadromous run. On April 2, 1990, the National Oceanic and Atmospheric Administration Fisheries Service (NOAA - formerly National Marine Fisheries Service) received a petition from the Shoshone-Bannock Tribes (SBT) to list Snake River sockeye salmon as endangered under the United States Endangered Species Act (ESA) of 1973. On November 20, 1991, NOAA declared Snake River sockeye salmon endangered. In 1991, the SBT, along with the Idaho Department of Fish & Game (IDFG), initiated the Snake River Sockeye Salmon Sawtooth Valley Project (Sawtooth Valley Project) with funding from the Bonneville Power Administration (BPA). The goal of this program is to conserve genetic resources and to rebuild Snake River sockeye salmon populations in Idaho. Coordination of this effort is carried out under the guidance of the Stanley Basin Sockeye Technical Oversight Committee (SBSTOC), a team of biologists representing the agencies involved in the recovery and management of Snake River sockeye salmon. National Oceanic and Atmospheric Administration Fisheries Service ESA Permit Nos. 1120, 1124, and 1481 authorize IDFG to conduct scientific research on listed Snake River sockeye salmon. Initial steps to recover the species involved the establishment of captive broodstocks at the Eagle Fish Hatchery in Idaho and at NOAA facilities in Washington State (for a review, see Flagg 1993; Johnson 1993; Flagg and McAuley 1994; Kline 1994; Johnson and Pravecek 1995; Kline and Younk 1995; Flagg et al. 1996; Johnson and Pravecek 1996; Kline and Lamansky 1997; Pravecek and

  6. Biogas Koczala. Biogas project in Koczala. Feasibility study. Technical report

    International Nuclear Information System (INIS)

    2004-08-01

    The present production of district heating in Koczala is based on coal. The district heating system is worn out technically and economically and according to the 2001 Energy Plan of Koczala the district heating plant shall be converted to a combination of a biogas fired CHP and a wood chip boiler. The overall objective of this project is to access the feasibility and viability construction an operation of a biogas plant owned by the co-operative agricultural company, Poldanor S.A. The feasibility study includes: 1) Availability of organic waste in the Koczala area, 2) Possibilities of using energy crops in the biogas plant, 3) Possibilities of receiving grants from the Polish National Fund for Environmental Protection, the new EU regional funds and through the joint implementation market (CO 2 quotas), 4) Alternative locations of the biogas plant and the CHP unit, 5) Alternative strategies for selling electricity and heat, 6) Organisational issues (ownership). This report concludes that implementing the biogas project is environmentally and financially feasible and viable. If organic waste and/or maize silage can be provided and gasified without problems, the plant can supply as well the Koczala farm as the fodder mill with steam and heat, and also supply Koczala district heating system with approx. 75% of yearly heat consumption. Furthermore, electricity is supplied to the fodder mill and the public grid. (BA)

  7. Radionuclide levels in fish from Lake Athabasca February 1993. Northern River Basins Study project report no.26

    International Nuclear Information System (INIS)

    Smithson, G.

    1993-12-01

    The Northern River Basins Study was initiated through the 'Canada-Alberta-Northwest Territories Agreement Respecting the Peace-Athabasca-Slave River Basin Study, Phase II - Technical Studies' which was signed September 27, 1991. The purpose of the study is to understand and characterize the cumulative effects of development on the water and aquatic environment of the Study Area by coordinating with existing programs and undertaking appropriate new technical studies. This publication reports the method and findings of particular work conducted as part of the Northern River Basins Study. As such, the work was governed by a specific terms of reference and is expected to contribute information about the Study Area within the context of the overall study as described by the Study Final Report. This report has been reviewed by the Study Science Advisory Committee in regards to scientific content and has been approved by the Study Board of Directors for public release. It is explicit in the objectives of the Study to report the results of technical work regularly to the public. This objective is served by distributing project reports to an extensive network of libraries, agencies, organizations and interested individuals and by granting universal permission to reproduce the material. This report contains referenced data obtained from external to the Northern River Basins Study. Individuals interested in using external data must obtain permission to do so from the donor agency. (author). 47 refs., 9 tabs., 2 figs

  8. Radionuclide levels in fish from Lake Athabasca February 1993. Northern River Basins Study project report no.26

    Energy Technology Data Exchange (ETDEWEB)

    Smithson, G [Saskatchewan Research Council, Saskatoon, SK (Canada)

    1993-12-01

    The Northern River Basins Study was initiated through the `Canada-Alberta-Northwest Territories Agreement Respecting the Peace-Athabasca-Slave River Basin Study, Phase II - Technical Studies` which was signed September 27, 1991. The purpose of the study is to understand and characterize the cumulative effects of development on the water and aquatic environment of the Study Area by coordinating with existing programs and undertaking appropriate new technical studies. This publication reports the method and findings of particular work conducted as part of the Northern River Basins Study. As such, the work was governed by a specific terms of reference and is expected to contribute information about the Study Area within the context of the overall study as described by the Study Final Report. This report has been reviewed by the Study Science Advisory Committee in regards to scientific content and has been approved by the Study Board of Directors for public release. It is explicit in the objectives of the Study to report the results of technical work regularly to the public. This objective is served by distributing project reports to an extensive network of libraries, agencies, organizations and interested individuals and by granting universal permission to reproduce the material. This report contains referenced data obtained from external to the Northern River Basins Study. Individuals interested in using external data must obtain permission to do so from the donor agency. (author). 47 refs., 9 tabs., 2 figs.

  9. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  10. River Protection Project (RPP) Dangerous Waste Training Plan

    International Nuclear Information System (INIS)

    POHTO, R.E.

    2000-01-01

    This supporting document contains the training plan for dangerous waste management at River Protection Project TSD Units. This document outlines the dangerous waste training program developed and implemented for all Treatment, Storage, and Disposal (TSD) Units operated by River Protection Project (RPP) in the Hanford 200 East, 200 West and 600 Areas and the <90 Day Accumulation Area at 209E. Operating TSD Units managed by RPP are: the Double-Shell Tank (DST) System, 204-AR Waste Unloading Facility, Grout, and the Single-Shell Tank (SST) System. The program is designed in compliance with the requirements of Washington Administrative Code (WAC) 173-303-330 and Title 40 Code of Federal Regulations (CFR) 265.16 for the development of a written dangerous waste training program and the Hanford Facility Permit. Training requirements were determined by an assessment of employee duties and responsibilities. The RPP training program is designed to prepare employees to operate and maintain the Tank Farms in a safe, effective, efficient, and environmentally sound manner. In addition to preparing employees to operate and maintain the Tank Farms under normal conditions, the training program ensures that employees are prepared to respond in a prompt and effective manner should abnormal or emergency conditions occur. Emergency response training is consistent with emergency responses outlined in the following Building Emergency Plans: HNF-IP-0263-TF and HNF-=IP-0263-209E

  11. River Protection Project (RPP) Dangerous Waste Training Plan

    Energy Technology Data Exchange (ETDEWEB)

    POHTO, R.E.

    2000-03-09

    This supporting document contains the training plan for dangerous waste management at River Protection Project TSD Units. This document outlines the dangerous waste training program developed and implemented for all Treatment, Storage, and Disposal (TSD) Units operated by River Protection Project (RPP) in the Hanford 200 East, 200 West and 600 Areas and the <90 Day Accumulation Area at 209E. Operating TSD Units managed by RPP are: the Double-Shell Tank (DST) System, 204-AR Waste Unloading Facility, Grout, and the Single-Shell Tank (SST) System. The program is designed in compliance with the requirements of Washington Administrative Code (WAC) 173-303-330 and Title 40 Code of Federal Regulations (CFR) 265.16 for the development of a written dangerous waste training program and the Hanford Facility Permit. Training requirements were determined by an assessment of employee duties and responsibilities. The RPP training program is designed to prepare employees to operate and maintain the Tank Farms in a safe, effective, efficient, and environmentally sound manner. In addition to preparing employees to operate and maintain the Tank Farms under normal conditions, the training program ensures that employees are prepared to respond in a prompt and effective manner should abnormal or emergency conditions occur. Emergency response training is consistent with emergency responses outlined in the following Building Emergency Plans: HNF-IP-0263-TF and HNF-=IP-0263-209E.

  12. Alligator rivers analogue project. Final report; volume 1; summary of findings

    International Nuclear Information System (INIS)

    Duerden, P.; Lever, D.A.; Sverjensky, D.A.; Townley, L.R.

    1992-01-01

    The Koongarra uranium ore deposit is located in the Alligator Rivers Region of the Northern Territory of Australia. Many of the processes that have controlled the development of this natural system are relevant to the performance assessment of radioactive waste repositories. An agreement was reached in 1987 by a number of agencies concerned with radioactive waste disposal to set up the International Alligator Rivers Analogue Project (ARAP) to study relevant aspects of the hydrological and geochemical evolution of the site. The Project ran for five years. The aims of the study were: to contribute to the production of reliable and realistic models for radionuclide migration within geological environments relevant to the assessment of the safety of radioactive waste repositories; to develop methods of validation of models using a combination of laboratory and field data associated with the Koongarra uranium deposit; and to encourage maximum interaction between modellers and experimentalists in achieving these objectives. It was anticipated that the substantial databases generated in the field and laboratory studies would then be used to develop and test geochemical and radionuclide transport models. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project is one of a series of 16 volumes

  13. Global Analysis of Climate Change Projection Effects on Atmospheric Rivers

    Science.gov (United States)

    Espinoza, Vicky; Waliser, Duane E.; Guan, Bin; Lavers, David A.; Ralph, F. Martin

    2018-05-01

    A uniform, global approach is used to quantify how atmospheric rivers (ARs) change between Coupled Model Intercomparison Project Phase 5 historical simulations and future projections under the Representative Concentration Pathway (RCP) 4.5 and RCP8.5 warming scenarios. The projections indicate that while there will be 10% fewer ARs in the future, the ARs will be 25% longer, 25% wider, and exhibit stronger integrated water vapor transports (IVTs) under RCP8.5. These changes result in pronounced increases in the frequency (IVT strength) of AR conditions under RCP8.5: 50% (25%) globally, 50% (20%) in the northern midlatitudes, and 60% (20%) in the southern midlatitudes. The models exhibit systematic low biases across the midlatitudes in replicating historical AR frequency ( 10%), zonal IVT ( 15%), and meridional IVT ( 25%), with sizable intermodel differences. A more detailed examination of six regions strongly impacted by ARs suggests that the western United States, northwestern Europe, and southwestern South America exhibit considerable intermodel differences in projected changes in ARs.

  14. NTRCI Legacy Engine Research and Development Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Holbert, Connie [National Transportation Research Center, Inc., Knoxville, TN (United States); Petrolino, Joseph [National Transportation Research Center, Inc., Knoxville, TN (United States); Watkins, Bart [Power Source Technologies Inc., Corvallis, OR (United States); Irick, David [Power Source Technologies Inc., Corvallis, OR (United States)

    2011-12-31

    The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engine's commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector

  15. Technical safety appraisal of the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    1989-09-01

    This report presents the results of one in a series of Technical Safety Appraisals (TSAs) being conducted of DOE nuclear operations by the Assistant Secretary for Environment, Safety, and Health Office of Safety Appraisals TSAs are one of the ititiatives announced by the Secretary of Energy on September 18, 1985, to enhance the DOE environment, safety and health program. This report presents the results of a TSA of the West Valley Demonstration Project (WVDP). The appraisal was conducted by a team of exerts assembled by the DOE Office of Safety Appraisal and was conducted during onsite visits of June 26-30 and July 10-21, 1989. West Valley, about 30 miles south of Buffalo, New York is the location of the only commercial nuclear fuel reprocessing facility operated in the United States. Nuclear Fuels Services, Inc. (NFS) operated the plant from 1966 to 1972 and processed about 640 metric tons of spent reactor fuel. The reprocessing operation generated about 560,000 gallons of high-level radioactive waste, which was transferred into underground tanks for storage. In 1972 NFS closed the plant and subsequently decided not to reopen it

  16. Legal control of technical large-scale projects

    International Nuclear Information System (INIS)

    Kuhnt, D.

    1981-01-01

    The principle derived from experience that large projects require approval by the courts may not longer be valid. On the contrary, the courts are only entitled to real legal control according to the principle of the division of powers. If not accurately defined legal terms cannot be waived, the administration has to set the frame for review by courts by technical standards to be given in statutory ordinances, administrative provisions and administrative instructions. The average term of administrative proceedings has to be shortened considerably. The plaintiff as well as the beneficiaries of the act of licensing have a right to a prompt decision. The immediate execution of a decision can, on principle, also not be waived in future. More than up to now, the careful consideration of the interests and not an anticipated judgement on the main issue has to be the subject of legal examination according to section 80, subsection 5 of the German code of administrative procedure (Verwaltungsgerichtsordnung). (orig./HP) [de

  17. Planning, development and experiences obtained with the execution of the Project Surata River

    International Nuclear Information System (INIS)

    Carreno, Erwin Wolff

    2004-01-01

    From May 1997 is executed the Project, Reduction of the Contamination to the small mining in the basin of the Surata River (known and abbreviated as project Surata River), which has been developed inside the mark of the technical cooperation between the governments from Colombia and Germany. The German support will culminate September 30 the 2004. After many trips for reasons of public order and for those originated in the administrative processes, it could diagnose himself the mining of Vetas and California region, it stops later on to execute works in the different facilities of benefit of minerals in dispersed form and finally to find the most significant route as contribution of the contamination reduction: to develop integral measures in each one of the units that benefit the mineral in the area. The efforts so much institutional as personnel they have been very big and the strong investments; it memorized of the lessons, and it is aspired to continue with the programming of the activities beyond October - 2004, with the support of the involved Colombian institutions. Now they know each other and they have been applied in the region, technologies environmentally clean in prosecution of gold minerals, those that in opposition of that thought of a principle, they also rebound in increment of the economic revenues of the miners

  18. Technical knowledge and water resources management: A comparative study of river basin councils, Brazil

    Science.gov (United States)

    Lemos, Maria Carmen; Bell, Andrew R.; Engle, Nathan L.; Formiga-Johnsson, Rosa Maria; Nelson, Donald R.

    2010-06-01

    Better understanding of the factors that shape the use of technical knowledge in water management is important both to increase its relevance to decision-making and sustainable governance and to inform knowledge producers where needs lie. This is particularly critical in the context of the many stressors threatening water resources around the world. Recent scholarship focusing on innovative water management institutions emphasizes knowledge use as critical to water systems' adaptive capacity to respond to these stressors. For the past 15 years, water resources management in Brazil has undergone an encompassing reform that has created a set of participatory councils at the river basin level. Using data from a survey of 626 members of these councils across 18 river basins, this article examines the use of technical knowledge (e.g., climate and weather forecasts, reservoir streamflow models, environmental impact assessments, among others) within these councils. It finds that use of knowledge positively aligns with access, a more diverse and broader discussion agenda, and a higher sense of effectiveness. Yet, use of technical knowledge is also associated with skewed levels of power within the councils.

  19. Recommendations to the Technical Steering Panel regarding approach for estimating individual radiation doses resulting from releases of radionuclides to the Columbia River

    International Nuclear Information System (INIS)

    Brothers, A.J.; Napier, B.A.

    1992-08-01

    At the direction of the Technical Steering Panel (TSP) of the Hanford Environmental Dose Reconstruction (HEDR) Project, Battelle staff have reviewed and analyzed available data regarding possible historical radiation doses to individuals resulting from radionuclide releases to the Columbia River. The objective of this review was to recommend to the TSP the spatial and temporal scope and level of effort on Columbia River work to most effectively extend work performed in Phase I of the project to meet the project objectives. Four stretches of the Columbia River and adjacent Pacific coastal waters were defined and investigated for four time periods. Radiation doses arising from ten potentially major exposure pathways were evaluated for each of the time/location combinations, and several alternative methods were defined for estimating the doses from each pathway. Preliminary cost estimates were also developed for implementing dose estimation activities for each of the possible combinations. The number of combinations of the alternatives is obviously very large. A ''value of information'' (VOI) decision analysis tool was developed and applied to the problem of selecting a few ''optimal'' sets of alternatives to consider. This VOI analysis relies on both available data and the judgement of technical experts. Input data and the algorithms used are described

  20. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of

  1. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  2. Environmental considerations of coal gasification technology and the Wabash River Repowering Project

    International Nuclear Information System (INIS)

    Lessig, W.S.; Frederick, J.D.

    1993-01-01

    The Clean Air Act Amendments of 1990 have mandated a significant reduction in sulfur dioxide emissions. Coal gasification can assist coal burning utilities in meeting this challenge. The use of combustion turbines in the cycle is an important factor in terms of efficiency and pollution control technologies. The gasification process can be utilized in several applications including 'repowering' existing coal-fired facilities as well as new 'greenfield' projects. This paper addresses the environmental benefits of the repowering application at PSI Energy's Wabash River Station. The environmental impacts of air, water, solid waste, trace hazardous air pollutants, and fuel sources are addressed. Specifically, sulfur removal is discussed on both a technical and an economic level

  3. HANFORD SITE RIVER PROTECTION PROJECT (RPP) TANK FARM CLOSURE

    International Nuclear Information System (INIS)

    JARAYSI, M.N.; SMITH, Z.; QUINTERO, R.; BURANDT, M.B.; HEWITT, W.

    2006-01-01

    The U. S. Department of Energy, Office of River Protection and the CH2M HILL Hanford Group, Inc. are responsible for the operations, cleanup, and closure activities at the Hanford Tank Farms. There are 177 tanks overall in the tank farms, 149 single-shell tanks (see Figure 1), and 28 double-shell tanks (see Figure 2). The single-shell tanks were constructed 40 to 60 years ago and all have exceeded their design life. The single-shell tanks do not meet Resource Conservation and Recovery Act of 1976 [1] requirements. Accordingly, radioactive waste is being retrieved from the single-shell tanks and transferred to double-shell tanks for storage prior to treatment through vitrification and disposal. Following retrieval of as much waste as is technically possible from the single-shell tanks, the Office of River Protection plans to close the single-shell tanks in accordance with the Hanford Federal Facility Agreement and Consent Order [2] and the Atomic Energy Act of 1954 [3] requirements. The double-shell tanks will remain in operation through much of the cleanup mission until sufficient waste has been treated such that the Office of River Protection can commence closing the double-shell tanks. At the current time, however, the focus is on retrieving waste and closing the single-shell tanks. The single-shell tanks are being managed and will be closed in accordance with the pertinent requirements in: Resource Conservation and Recovery Act of 1976 and its Washington State-authorized Dangerous Waste Regulations [4], US DOE Order 435.1 Radioactive Waste Management [5], the National Environmental Policy Act of 1969 [6], and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [7]. The Hanford Federal Facility Agreement and Consent Order, which is commonly referred to as the Tri-Party Agreement or TPA, was originally signed by Department of Energy, the State of Washington, and the U. S. Environmental Protection Agency in 1989. Meanwhile, the

  4. The Ohio River Valley CO2 Storage Project AEP Mountaineer Plan, West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    Neeraj Gupta

    2009-01-07

    This report includes an evaluation of deep rock formations with the objective of providing practical maps, data, and some of the issues considered for carbon dioxide (CO{sub 2}) storage projects in the Ohio River Valley. Injection and storage of CO{sub 2} into deep rock formations represents a feasible option for reducing greenhouse gas emissions from coal-burning power plants concentrated along the Ohio River Valley area. This study is sponsored by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), American Electric Power (AEP), BP, Ohio Coal Development Office, Schlumberger, and Battelle along with its Pacific Northwest Division. An extensive program of drilling, sampling, and testing of a deep well combined with a seismic survey was used to characterize the local and regional geologic features at AEP's 1300-megawatt (MW) Mountaineer Power Plant. Site characterization information has been used as part of a systematic design feasibility assessment for a first-of-a-kind integrated capture and storage facility at an existing coal-fired power plant in the Ohio River Valley region--an area with a large concentration of power plants and other emission sources. Subsurface characterization data have been used for reservoir simulations and to support the review of the issues relating to injection, monitoring, strategy, risk assessment, and regulatory permitting. The high-sulfur coal samples from the region have been tested in a capture test facility to evaluate and optimize basic design for a small-scale capture system and eventually to prepare a detailed design for a capture, local transport, and injection facility. The Ohio River Valley CO{sub 2} Storage Project was conducted in phases with the ultimate objectives of demonstrating both the technical aspects of CO{sub 2} storage and the testing, logistical, regulatory, and outreach issues related to conducting such a project at a large point source under realistic constraints. The site

  5. Landfill Gas Energy Project Data and Landfill Technical Data

    Science.gov (United States)

    This page provides data from the LMOP Database for U.S. landfills and LFG energy projects in Excel files, a map of project and candidate landfill counts by state, project profiles for a select group of projects, and information about Project Expo sites.

  6. Fisher research and the Kings River Sustainable Forest Ecosystem Project: current results and future efforts

    Science.gov (United States)

    Brian B. Boroski; Richard T. Golightly; Amie K. Mazzoni; Kimberly A. Sager

    2002-01-01

    The Kings River Sustainable Forest Ecosystems Project was initiated on the Kings River Ranger District of the Sierra National Forest, California, in 1993, with fieldwork beginning in 1994. Knowledge of the ecology of the fisher (Martes pennanti) in the Project area, and in the Sierra Nevada of California in general, is insufficient to develop...

  7. Atmospheric River Tracking Method Intercomparison Project (ARTMIP: project goals and experimental design

    Directory of Open Access Journals (Sweden)

    C. A. Shields

    2018-06-01

    Full Text Available The Atmospheric River Tracking Method Intercomparison Project (ARTMIP is an international collaborative effort to understand and quantify the uncertainties in atmospheric river (AR science based on detection algorithm alone. Currently, there are many AR identification and tracking algorithms in the literature with a wide range of techniques and conclusions. ARTMIP strives to provide the community with information on different methodologies and provide guidance on the most appropriate algorithm for a given science question or region of interest. All ARTMIP participants will implement their detection algorithms on a specified common dataset for a defined period of time. The project is divided into two phases: Tier 1 will utilize the Modern-Era Retrospective analysis for Research and Applications, version 2 (MERRA-2 reanalysis from January 1980 to June 2017 and will be used as a baseline for all subsequent comparisons. Participation in Tier 1 is required. Tier 2 will be optional and include sensitivity studies designed around specific science questions, such as reanalysis uncertainty and climate change. High-resolution reanalysis and/or model output will be used wherever possible. Proposed metrics include AR frequency, duration, intensity, and precipitation attributable to ARs. Here, we present the ARTMIP experimental design, timeline, project requirements, and a brief description of the variety of methodologies in the current literature. We also present results from our 1-month proof-of-concept trial run designed to illustrate the utility and feasibility of the ARTMIP project.

  8. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Science.gov (United States)

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. Making the most of LCA in technical inter-organisational R&D projects

    DEFF Research Database (Denmark)

    Sandin, Gustav; Clancy, Gunilla; Heimersson, Sara

    2014-01-01

    In technical Research and Development (R&D) projects, a Life Cycle Assessment (LCA) of the technology under development is sometimes carried out. Particularly in inter-organisational R&D projects, the roles of LCAs tend to be unclear and arbitrary, and as a consequence, LCA work is not adequately...... designed for the needs of the project. There is a need for research on how to choose an appropriate role for LCA in such projects and how to plan LCA work accordingly. We have identified some possible roles of LCA in inter-organisational R&D projects and used experiences from LCA work in different...... such projects to identify four project characteristics that are decisive for what roles the LCA can have. The project characteristics are: (i) the project's potential influence on environmental impacts, (ii) the degrees of freedom available for the technical direction of the project, (iii) the project...

  10. More dams planned for Nitassinan Rivers : Innu Nation backgrounder on the proposed Churchill River hydro projects

    International Nuclear Information System (INIS)

    1999-01-01

    The Labrador Innu have expressed their concerns regarding the proposed development of a huge hydroelectric project for the Nitassinan Rivers. The Innu people were not consulted regarding the negotiations which will take place between Newfoundland and Quebec. The biggest concern of the Innu people is the cumulative environmental and social effects of the proposed development and how it will contribute to opening up their territory to further development. For example, access roads, transmission corridors and large-scale clear-cut forestry operations would all impact on their traditional way of life. This paper also described the impacts that the Innu have already experienced as a result of hydroelectric development on the Nitassinan Rivers during the 1970s, when the government of Newfoundland gave the rights to develop and exploit water resources, forests and minerals to a private company. At that time, large areas of hunting and trapping territories were flooded, belongings were lost and burial sites were flooded. The flooding also resulted in increased levels of methyl mercury in fish in the reservoirs as well as downstream. The losses suffered by the Innu people have yet to be addressed by the governments

  11. Savannah River Ecology Laboratory, Annual Technical Progress Report of Ecological Research, June 30, 2002

    Energy Technology Data Exchange (ETDEWEB)

    Paul M. Bertsch, (Director)

    2002-06-30

    The Savannah River Ecology Laboratory (SREL) is a research unit of The University of Georgia (UGA) and has been conducting ecological research on the Savannah River Site (SRS) near Aiken, South Carolina for 50 years. The overall mission of the Laboratory is to acquire and communicate knowledge of ecological processes and principles. SREL conducts fundamental and applied ecological research, as well as education and outreach programs, under a Cooperative Agreement with the U.S. Department of Energy (DOE). The Laboratory's research mission during the 2002 fiscal year was fulfilled with the publication of 76 journal articles and book chapters by faculty, technical staff, students, and visiting scientists. An additional 50 journal articles have been submitted or are in press. Other noteworthy events took place as faculty members, staff, and graduate students received awards. These are described in the section titled Special Accomplishments of Faculty, Staff, Students, and Administration on page 51. Notable scientific accomplishments include work conducted on contaminant transport, stable isotopes, sandhills ecology, and phytoremediation: (1) A collaborative study between Dr. Tom Hinton at SREL and scientists at SRTC demonstrated the feasibility of using illite clay to sequester 137Cs in sediments along the P and R reactor cooling canal system, where approximately 3,000 acres of land are contaminated. Overall, the study showed significant decreases in cesium concentrations and bioavailability following the addition of illite with no sign of harm to the ecosystem. While the cesium remains sequestered from the biosphere, its radioactivity decays and the process progresses from contaminant immobilization to remediation. (2) SREL's stable isotope laboratory is now fully functional. Stable isotope distributions in nature can provide important insights into many historical and current environmental processes. Dr. Christopher Romanek is leading SREL's research

  12. Savannah River Ecology Laboratory, Annual Technical Progress Report of Ecological Research, June 30, 2002

    International Nuclear Information System (INIS)

    Paul M. Bertsch,

    2002-01-01

    The Savannah River Ecology Laboratory (SREL) is a research unit of The University of Georgia (UGA) and has been conducting ecological research on the Savannah River Site (SRS) near Aiken, South Carolina for 50 years. The overall mission of the Laboratory is to acquire and communicate knowledge of ecological processes and principles. SREL conducts fundamental and applied ecological research, as well as education and outreach programs, under a Cooperative Agreement with the U.S. Department of Energy (DOE). The Laboratory's research mission during the 2002 fiscal year was fulfilled with the publication of 76 journal articles and book chapters by faculty, technical staff, students, and visiting scientists. An additional 50 journal articles have been submitted or are in press. Other noteworthy events took place as faculty members, staff, and graduate students received awards. These are described in the section titled Special Accomplishments of Faculty, Staff, Students, and Administration on page 51. Notable scientific accomplishments include work conducted on contaminant transport, stable isotopes, sandhills ecology, and phytoremediation: (1) A collaborative study between Dr. Tom Hinton at SREL and scientists at SRTC demonstrated the feasibility of using illite clay to sequester 137Cs in sediments along the P and R reactor cooling canal system, where approximately 3, 000 acres of land are contaminated. Overall, the study showed significant decreases in cesium concentrations and bioavailability following the addition of illite with no sign of harm to the ecosystem. While the cesium remains sequestered from the biosphere, its radioactivity decays and the process progresses from contaminant immobilization to remediation. (2) SREL's stable isotope laboratory is now fully functional. Stable isotope distributions in nature can provide important insights into many historical and current environmental processes. Dr. Christopher Romanek is leading SREL's research in this area

  13. A technical description of the FlexHouse Project Testbed

    DEFF Research Database (Denmark)

    Sørensen, Jens Otto

    2000-01-01

    This paper describes the FlexHouse project testbed; a server dedicated to experiments within the FlexHouse project. The FlexHouse project is a project originating from The Business Computing Research Group at The Aarhus School of Business. The purpose of the project is to identify and develop...... methods that satisfy the following three requirements. Flexibility with respect to evolving data sources. Flexibility with respect to change of information needs. Efficiency with respect to view management....

  14. The Snake River Plain Volcanic Province: Insights from Project Hotspot

    Science.gov (United States)

    Shervais, J. W.; Potter, K. E.; Hanan, B. B.; Jean, M. M.; Duncan, R. A.; Champion, D. E.; Vetter, S.; Glen, J. M. G.; Christiansen, E. H.; Miggins, D. P.; Nielson, D. L.

    2017-12-01

    The Snake River Plain (SRP) Volcanic Province is the best modern example of a time-transgressive hotspot track beneath continental crust. The SRP began 17 Ma with massive eruptions of Columbia River basalt and rhyolite. After 12 Ma volcanism progressed towards Yellowstone, with early rhyolite overlain by basalts that may exceed 2 km thick. The early rhyolites are anorogenic with dry phenocryst assemblages and eruption temperatures up to 950C. Tholeiitic basalts have major and trace element compositions similar to ocean island basalts (OIB). Project Hotspot cored three deep holes in the central and western Snake River Plain: Kimama (mostly basalt), Kimberly (mostly rhyolite), and Mountain Home (lake sediments and basaslt). The Kimberly core documents rhyolite ash flows up to 700 m thick, possibly filling a caldera or sag. Chemical stratigraphy in Kimama and other basalt cores document fractional crystallization in relatively shallow magma chambers with episodic magma recharge. Age-depth relations in the Kimama core suggest accumulation rates of roughly 305 m/Ma. Surface and subsurface basalt flows show systematic variations in Sr-Nd-Pb isotopes with distance from Yellowstone interpreted to reflect changes in the proportion of plume source and the underlying heterogeneous cratonic lithosphere, which varies in age, composition, and thickness from west to east. Sr-Nd-Pb isotopes suggest <5% lithospheric input into a system dominated by OIB-like plume-derived basalts. A major flare-up of basaltic volcanism occurred 75-780 ka throughout the entire SRP, from Yellowstone in the east to Boise in the west. The youngest western SRP basalts are transitional alkali basalts that range in age from circa 900 ka to 2 ka, with trace element and isotopic compositions similar to the plume component of Hawaiian basalts. These observations suggest that ancient SCLM was replaced by plume mantle after the North America passed over the hotspot in the western SRP, which triggered renewed

  15. Nuclear incident monitor criticality alarm instrument for the Savannah River Site: Technical manual

    International Nuclear Information System (INIS)

    Jenkins, J.B.

    1996-01-01

    The Savannah River Site is a Department of Energy facility. The facility stores, processes, and works with fissionable material at a number of locations. Technical standards and US Department of Energy orders, require these locations to be monitored by criticality alarm systems under certain circumstances. The Savannah River Site calls such instruments Nuclear Incident Monitors or NIMs. The Sole purpose of the Nuclear Incident Monitor is to provide an immediate evacuation signal in the case of an accidental criticality in order to minimize personnel exposure to radiation. The new unit is the third generation Nuclear Incident Monitor at the Savannah River Site. The second generation unit was developed in 1979. It was designed to eliminate vacuum-tube circuits, and was the first solid state NIM at SRS. The major design objectives of the second generation NIM were to improve reliability and reduce maintenance costs. Ten prototype units have been built and tested. This report describes the design of the new NIM and the testing that took place to verify its acceptability

  16. Internal Technical Report, Safety Analysis Report 5 MW(e) Raft River Research and Development Plant

    Energy Technology Data Exchange (ETDEWEB)

    Brown, E.S.; Homer, G.B.; Shaber, C.R.; Thurow, T.L.

    1981-11-17

    The Raft River Geothermal Site is located in Southern Idaho's Raft River Valley, southwest of Malta, Idaho, in Cassia County. EG and G idaho, Inc., is the DOE's prime contractor for development of the Raft River geothermal field. Contract work has been progressing for several years towards creating a fully integrated utilization of geothermal water. Developmental progress has resulted in the drilling of seven major DOE wells. Four are producing geothermal water from reservoir temperatures measured to approximately 149 C (approximately 300 F). Closed-in well head pressures range from 69 to 102 kPa (100 to 175 psi). Two wells are scheduled for geothermal cold 60 C (140 F) water reinjection. The prime development effort is for a power plant designed to generate electricity using the heat from the geothermal hot water. The plant is designated as the ''5 MW(e) Raft River Research and Development Plant'' project. General site management assigned to EG and G has resulted in planning and development of many parts of the 5 MW program. Support and development activities have included: (1) engineering design, procurement, and construction support; (2) fluid supply and injection facilities, their study, and control; (3) development and installation of transfer piping systems for geothermal water collection and disposal by injection; and (4) heat exchanger fouling tests.

  17. Internal Technical Report, Safety Analysis Report 5 MW(e) Raft River Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Brown, E.S.; Homer, G.B.; Spencer, S.G.; Shaber, C.R.

    1980-05-30

    The Raft River Geothermal Site is located in Southern Idaho's Raft River Valley, southwest of Malta, Idaho, in Cassia County. EG and G idaho, Inc., is the DOE's prime contractor for development of the Raft River geothermal field. Contract work has been progressing for several years towards creating a fully integrated utilization of geothermal water. Developmental progress has resulted in the drilling of seven major DOE wells. Four are producing geothermal water from reservoir temperatures measured to approximately 149 C (approximately 300 F). Closed-in well head pressures range from 69 to 102 kPa (100 to 175 psi). Two wells are scheduled for geothermal cold 60 C (140 F) water reinjection. The prime development effort is for a power plant designed to generate electricity using the heat from the geothermal hot water. The plant is designated as the ''5 MW(e) Raft River Research and Development Plant'' project. General site management assigned to EG and G has resulted in planning and development of many parts of the 5 MW program. Support and development activities have included: (1) engineering design, procurement, and construction support; (2) fluid supply and injection facilities, their study, and control; (3) development and installation of transfer piping systems for geothermal water collection and disposal by injection; and (4) heat exchanger fouling tests.

  18. Evaluation of nuclear facility decommissioning projects. Project summary report, Elk River Reactor

    International Nuclear Information System (INIS)

    Miller, R.L.; Adams, J.A.

    1982-12-01

    This report summarizes information concerning the decommissioning of the Elk River Reactor. Decommissioning data from available documents were input into a computerized data-handling system in a manner that permits specific information to be readily retrieved. The information is in a form that assists the Nuclear Regulatory Commission in its assessment of decommissioning alternatives and ALARA methods for future decommissionings projects. Samples of computer reports are included in the report. Decommissioning of other reactors, including NRC reference decommissioning studies, will be described in similar reports

  19. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  20. Uganda's National Transmission Backbone Infrastructure Project: Technical Challenges and the Way Forward

    Science.gov (United States)

    Bulega, T.; Kyeyune, A.; Onek, P.; Sseguya, R.; Mbabazi, D.; Katwiremu, E.

    2011-10-01

    Several publications have identified technical challenges facing Uganda's National Transmission Backbone Infrastructure project. This research addresses the technical limitations of the National Transmission Backbone Infrastructure project, evaluates the goals of the project, and compares the results against the technical capability of the backbone. The findings of the study indicate a bandwidth deficit, which will be addressed by using dense wave division multiplexing repeaters, leasing bandwidth from private companies. Microwave links for redundancy, a Network Operation Center for operation and maintenance, and deployment of wireless interoperability for microwave access as a last-mile solution are also suggested.

  1. Proposing buffer zones and simple technical solutions for safeguarding river water quality and public health

    Science.gov (United States)

    Podimata, M. V.; Bekri, E. S.; Yannopoulos, P. C.

    2012-04-01

    Framework Directive (WFD) 2000/60, but a practical necessity for the safeguarding of public health and ecosystem health, in general. The present study aims at developing a simple methodology for assessing spatial distribution characteristics of pollution in Erymanthos catchment. Pollution loads at various sites in Erymanthos watershed were illustrated with Geographical Information System (GIS). Flow rates of Erymanthos River were also taken into consideration. Based on previous studies, in situ river discharges have been compared to simulated discharges in order to calibrate the rainfall-runoff model ENNS which can then predict future scenarios regarding the river flow rates with consideration of climate change effects. The goal of this study is to detect the pertinent points and suggest a) suitable buffer zones in areas with high pollution risk and b) simple technical works in order to prevent the main channel of Erymanthos River from direct polluting discharges. The above systems could also act supportively in groundwater enrichment, forest protection and soil erosion prevention. Authors believe that the results of the study could assist authorities and engineers to design and develop strategies of improving river water quality and safeguarding public health. The proposed measures may be applicable to other catchments as well.

  2. Development of streamflow projections under changing climate conditions over Colorado River basin headwaters

    Directory of Open Access Journals (Sweden)

    W. P. Miller

    2011-07-01

    Full Text Available The current drought over the Colorado River Basin has raised concerns that the US Department of the Interior, Bureau of Reclamation (Reclamation may impose water shortages over the lower portion of the basin for the first time in history. The guidelines that determine levels of shortage are affected by relatively short-term (3 to 7 month forecasts determined by the Colorado Basin River Forecast Center (CBRFC using the National Weather Service (NWS River Forecasting System (RFS hydrologic model. While these forecasts by the CBRFC are useful, water managers within the basin are interested in long-term projections of streamflow, particularly under changing climate conditions. In this study, a bias-corrected, statistically downscaled dataset of projected climate is used to force the NWS RFS utilized by the CBRFC to derive projections of streamflow over the Green, Gunnison, and San Juan River headwater basins located within the Colorado River Basin. This study evaluates the impact of changing climate to evapotranspiration rates and contributes to a better understanding of how hydrologic processes change under varying climate conditions. The impact to evapotranspiration rates is taken into consideration and incorporated into the development of streamflow projections over Colorado River headwater basins in this study. Additionally, the NWS RFS is modified to account for impacts to evapotranspiration due to changing temperature over the basin. Adjusting evapotranspiration demands resulted in a 6 % to 13 % average decrease in runoff over the Gunnison River Basin when compared to static evapotranspiration rates. Streamflow projections derived using projections of future climate and the NWS RFS provided by the CBRFC resulted in decreased runoff in 2 of the 3 basins considered. Over the Gunnison and San Juan River basins, a 10 % to 15 % average decrease in basin runoff is projected through the year 2099. However, over the Green River basin, a 5 % to 8

  3. Selection and approbation of new technical approaches in innovation projects

    International Nuclear Information System (INIS)

    Matvienko, V.A.; Pastushenko, V.N.; Zvorykin, K.O.; Zvorykin, L.O.

    1999-01-01

    Large-scale technical approaches based on the application of new technologies, equipment, tools and other production equipping means (PEM) are to be previously tested by technical and engineering practice and thoroughly approved. These circumstances create objective prerequisites for organization within the infrastructure of the 'OU' of a special sector to solve such a problem. A structure-and-logic model of the infrastructure sector is represented. Principal trends of activities of the proposed new sector of the 'OU' infrastructure may become the following ones: personnel training, skill rising and attestation; adaptation of new samples of universal and auxiliary equipment; new technologies and equipment approbation; approbation of actions in nonstandard situations

  4. Habitat Evaluation Procedures (HEP) Report : Priest River, 2004-2005 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-02-01

    On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Priest River property, an acquisition completed by the Kalispel Tribe of Indians in 2001. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Priest River Project provides a total of 105.41 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 26.95 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Grassland habitat provides 23.78 HUs for Canada goose and mallard. Scmb-shrub vegetation provides 54.68 HUs for mallard, yellow warbler, and white-tailed deer.

  5. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004

    International Nuclear Information System (INIS)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems

  6. Cluster: Drafting. Course: Basic Technical Drafting. Research Project.

    Science.gov (United States)

    Sanford - Lee County Schools, NC.

    The set of six units is designed for use with an instructor in basic technical drafting and is also keyed to other texts. Each unit contains several task packages specifying prerequisites, rationale for learning, objectives, learning activities to be supervised by the instructor, and learning practice. The units cover: pictorial drawing; screw…

  7. Advising students in technical projects - recognizing problem scenarios

    DEFF Research Database (Denmark)

    Bærentzen, Jacob Andreas; Singh, Karan

    2014-01-01

    In this paper, we consider the advisor’s role during the technical work and the thesis preparation for a student in the final phase of a course of study in an engineering education. We initially claim that there is a marked difference between the learning that takes place in regular course work...

  8. WindFloat Pacific Project, Final Scientific and Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Banister, Kevin [Principle Power, Inc., Emeryville, CA (United States)

    2017-01-17

    PPI’s WindFloat Pacific project (WFP) was an up to 30 MW floating offshore wind demonstration project proposed off the Coast of Oregon. The project was to be sited approximately 18 miles due west of Coos Bay, in over 1000 ft. of water, and is the first floating offshore wind array proposed in the United States, and the first offshore wind project of any kind proposed off the West Coast. PPI’s WindFloat, a semi-submersible foundation designed for high-capacity (6MW+) offshore wind turbines, is at the heart of the proposed project, and enables access to the world class wind resource at the project site and, equally, to other deep water, high wind resource areas around the country.

  9. The JET Project Scientific and technical developments 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The JET (Joint European Torus) Project is fully described in EUR 5516e (EUR-JET-R5) 'The JET Project - Design Proposal'. This report describes developments in the project from the stage described in EUR 5516e until late in 1976. An introductory chapter describes the present state of the project and subsequent chapters deal in detail with the following topics: experimental programme aspects; vacuum vessel, pumping system, activation studies; toroidal field coils and mechanical structure; poloidal field system; assembly and maintenance; power supplies; control and data acquisition system; site and buildings

  10. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, R. Todd; Sexton, Amy D.

    2003-02-01

    The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2001 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla Subbasin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Projects continued to be maintained on 49 private properties, one 25-year Non-Exclusive Bureau of Indian Affairs' Easement was secured, six new projects implemented and two existing project areas improved to enhance anadromous fish habitat. New project locations included sites on the mid Umatilla River, upper Umatilla River, Mission Creek, Cottonwood Creek and Buckaroo Creek. New enhancements included: (1) construction of 11,264 feet of fencing between River Mile 43.0 and 46.5 on the Umatilla River, (2) a stream bank stabilization project implemented at approximately River Mile 63.5 Umatilla River to stabilize 330 feet of eroding stream bank and improve instream habitat diversity, included construction of eight root wad revetments and three boulder J-vanes, (3) drilling a 358-foot well for off-stream livestock watering at approximately River Mile 46.0 Umatilla River, (4) installing a 50-foot bottomless arch replacement culvert at approximately River Mile 3.0 Mission Creek, (5) installing a Geoweb stream ford crossing on Mission Creek (6) installing a 22-foot bottomless arch culvert at approximately River Mile 0.5 Cottonwood Creek, and (7) providing fence materials for construction of 21,300 feet of livestock exclusion fencing in the Buckaroo Creek Drainage. An approximate total of 3,800 native willow cuttings and 350 pounds of native grass seed was planted at new upper Umatilla River, Mission Creek and Cottonwood Creek project sites. Habitat improvements implemented at existing project sites included

  11. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  12. Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-30

    The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

  13. Technical solutions for waste treatment in the Belene project

    International Nuclear Information System (INIS)

    Büttner, K.; Eichhorn, H.

    2011-01-01

    Outline: In June 2010 NUKEM Technologies GmbH was awarded a contract from ATOMSTROYEXPORT JSC to perform the complete work package related to designing and completion of the equipment for treatment of radioactive waste on the turn-key basis for Belene NPP. Technical Solutions: Waste Streams and Technologies at UKC and UKS; Concentration Plant; Thermal Treatment of Resins Sorting Facility; Biological Waste Water Treatment; Conditioning – Cementation • Sorting of Radwaste; Plasma Facility; Grouting; Filter Press; Monitoring and Tracking

  14. Savannah River Ecology Laboratory. Annual technical progress report of ecological research

    International Nuclear Information System (INIS)

    Smith, M.H.

    1996-01-01

    The Savannah River Ecology Laboratory (SREL) is a research unit of the University of Georgia (UGA). The overall mission of the Laboratory is to acquire and communicate knowledge of ecological processes and principles. SREL conducts basic and applied ecological research, as well as education and outreach programs, under a contract with the U.S. Department of Energy (DOE) at the Savannah River Site (SRS) near Aiken, South Carolina. Significant accomplishments were made during the past year in the areas of research, education and service. The Laboratory's research mission was fulfilled with the publication of two books and 143 journal articles and book chapters by faculty, technical and students, and visiting scientists. An additional three books and about 80 journal articles currently are in press. Faculty, technician and students presented 193 lectures, scientific presentations, and posters to colleges and universities, including minority institutions. Dr. J Vaun McArthur organized and conducted the Third Annual SREL Symposium on the Environment: New Concepts in Strewn Ecology: An Integrative Approach. Dr. Michael Newman conducted a 5-day course titled Quantitative Methods in Ecotoxicology, and Dr. Brian Teppen of The Advanced Analytical Center for Environmental Sciences (AACES) taught a 3-day short course titled Introduction to Molecular Modeling of Environmental Systems. Dr. I. Lehr Brisbin co-hosted a meeting of the Crocodile Special Interest Group. Dr. Rebecca Sharitz attended four symposia in Japan during May and June 1996 and conducted meetings of the Executive Committee and Board of the International Association for Ecology (ENTECOL)

  15. Savannah River Ecology Laboratory. Annual technical progress report of ecological research

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M.H.

    1996-07-31

    The Savannah River Ecology Laboratory (SREL) is a research unit of the University of Georgia (UGA). The overall mission of the Laboratory is to acquire and communicate knowledge of ecological processes and principles. SREL conducts basic and applied ecological research, as well as education and outreach programs, under a contract with the U.S. Department of Energy (DOE) at the Savannah River Site (SRS) near Aiken, South Carolina. Significant accomplishments were made during the past year in the areas of research, education and service. The Laboratory`s research mission was fulfilled with the publication of two books and 143 journal articles and book chapters by faculty, technical and students, and visiting scientists. An additional three books and about 80 journal articles currently are in press. Faculty, technician and students presented 193 lectures, scientific presentations, and posters to colleges and universities, including minority institutions. Dr. J Vaun McArthur organized and conducted the Third Annual SREL Symposium on the Environment: New Concepts in Strewn Ecology: An Integrative Approach. Dr. Michael Newman conducted a 5-day course titled Quantitative Methods in Ecotoxicology, and Dr. Brian Teppen of The Advanced Analytical Center for Environmental Sciences (AACES) taught a 3-day short course titled Introduction to Molecular Modeling of Environmental Systems. Dr. I. Lehr Brisbin co-hosted a meeting of the Crocodile Special Interest Group. Dr. Rebecca Sharitz attended four symposia in Japan during May and June 1996 and conducted meetings of the Executive Committee and Board of the International Association for Ecology (ENTECOL).

  16. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  17. Hotspot: the Snake River Geothermal Drilling Project--initial report

    Science.gov (United States)

    Shervais, J.W.; Nielson, D.; Lachmar, T.; Christiansen, E.H.; Morgan, L.; Shanks, Wayne C.; Delahunty, C.; Schmitt, D.R.; Liberty, L.M.; Blackwell, D.D.; Glen, J.M.; Kessler, J.A.; Potter, K.E.; Jean, M.M.; Sant, C.J.; Freeman, T.

    2012-01-01

    The Snake River volcanic province (SRP) overlies a thermal anomaly that extends deep into the mantle; it represents one of the highest heat flow provinces in North America. The primary goal of this project is to evaluate geothermal potential in three distinct settings: (1) Kimama site: inferred high sub-aquifer geothermal gradient associated with the intrusion of mafic magmas, (2) Kimberly site: a valley-margin setting where surface heat flow may be driven by the up-flow of hot fluids along buried caldera ringfault complexes, and (3) Mountain Home site: a more traditional fault-bounded basin with thick sedimentary cover. The Kimama hole, on the axial volcanic zone, penetrated 1912 m of basalt with minor intercalated sediment; no rhyolite basement was encountered. Temperatures are isothermal through the aquifer (to 960 m), then rise steeply on a super-conductive gradient to an estimated bottom hole temperature of ~98°C. The Kimberly hole is on the inferred margin of a buried rhyolite eruptive center, penetrated rhyolite with intercalated basalt and sediment to a TD of 1958 m. Temperatures are isothermal at 55-60°C below 400 m, suggesting an immense passive geothermal resource. The Mountain Home hole is located above the margin of a buried gravity high in the western SRP. It penetrates a thick section of basalt and lacustrine sediment overlying altered basalt flows, hyaloclastites, and volcanic sediments, with a TD of 1821 m. Artesian flow of geothermal water from 1745 m depth documents a power-grade resource that is now being explored in more detail. In-depth studies continue at all three sites, complemented by high-resolution gravity, magnetic, and seismic surveys, and by downhole geophysical logging.

  18. TEACHING BASIC ELEMENTS IN TECHNICAL DRAWING – ORTHOGONAL PROJECTIONS

    Directory of Open Access Journals (Sweden)

    CLINCIU Ramona

    2017-05-01

    Full Text Available The paper presents applications developed using AutoCAD and 3D Studio MAX programs. These applications are constructed such as to enable, gradually, the development of the spatial abilities of the students and, at the same time, to enable the understanding of the principles for the representation of the orthogonal projections of the parts, as well as for the construction of their axonometric projections.

  19. 75 FR 6020 - Electrical Interconnection of the Lower Snake River Wind Energy Project

    Science.gov (United States)

    2010-02-05

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Lower Snake River Wind Energy Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE... (BPA) has decided to offer Puget Sound Energy Inc., a Large Generator Interconnection Agreement for...

  20. Foaming in Hanford River Protection Project Waste Treatment Plant LAW Evaporation Processes - FY01 Summary Report

    International Nuclear Information System (INIS)

    Calloway, T.B.

    2002-01-01

    The LAW evaporation processes currently being designed for the Hanford River Protection Project Waste Treatment Plant are subject to foaming. Experimental simulant studies have been conducted in an effort to achieve an effective antifoam agent suitable to mitigate such foaming

  1. Alligator Rivers Analogue project. Hydrogeological modelling. Final Report - Volume 6

    International Nuclear Information System (INIS)

    Townley, L.R.; Trefry, M.G.; Barr, A.D.; Braumiller, S.

    1992-01-01

    This volume describes hydrogeological modelling carried out as part of the Alligator Rivers Analogue Project. Hydrogeology has played a key integrating role in the Project, largely because water movement is believed to have controlled the evolution of the Koongarra uranium Orebody and therefore affects field observations of all types at all scales. Aquifer testing described uses the concept of transmissivity in its interpretation of aquifer response to pumping. The concept of an aquifer, a layer transmitting significant quantities of water in a mainly horizontal direction, seems hard to accept in an environment as heterogeneous as that at Koongarra. But modelling of aquifers both in one dimension and two dimensionally in plan has contributed significantly to our understanding of the site. A one-dimensional model with three layers (often described as a quasi two dimensional model) was applied to flow between the Fault and Koongarra Creek. Being a transient model, this model was able to show that reverse flows can indeed occur back towards the Fault, but only if there is distributed recharge over the orebody as well as a mechanism for the Fault, or a region near the Fault, to remove water from the simulated cross-section. The model also showed clearly that the response of the three-layered system, consisting of a highly weathered zone, a fractured transmissive zone and a less conductive lower schist zone, is governed mainly by the transmissivity and storage coefficient of the middle layer. The storage coefficient of the higher layer has little effect. A two-dimensional model in plan used a description of anisotropy to show that reverse flows can also occur even without a conducting Fault. Modelling of a three-dimensional region using discrete fractures showed that it is certainly possible to simulate systems like that observed at Koongarra, but that large amounts of data are probably needed to obtain realistic descriptions of the fracture networks. Inverse modelling

  2. Alligator Rivers Analogue project. Hydrogeological modelling. Final Report - Volume 6

    Energy Technology Data Exchange (ETDEWEB)

    Townley, L R; Trefry, M G; Barr, A D [CSIRO Div of Water Resources, PO Wembley, WA (Australia); Braumiller, S [Univ of Arizona, Tucson, AZ (United States). Dept of Hydrology and Water Resources; Kawanishi, M [Central Research Institute of Electric Power Industry, Abiko-Shi, Chiba-Ken (Japan); and others

    1993-12-31

    This volume describes hydrogeological modelling carried out as part of the Alligator Rivers Analogue Project. Hydrogeology has played a key integrating role in the Project, largely because water movement is believed to have controlled the evolution of the Koongarra uranium Orebody and therefore affects field observations of all types at all scales. Aquifer testing described uses the concept of transmissivity in its interpretation of aquifer response to pumping. The concept of an aquifer, a layer transmitting significant quantities of water in a mainly horizontal direction, seems hard to accept in an environment as heterogeneous as that at Koongarra. But modelling of aquifers both in one dimension and two dimensionally in plan has contributed significantly to our understanding of the site. A one-dimensional model with three layers (often described as a quasi two dimensional model) was applied to flow between the Fault and Koongarra Creek. Being a transient model, this model was able to show that reverse flows can indeed occur back towards the Fault, but only if there is distributed recharge over the orebody as well as a mechanism for the Fault, or a region near the Fault, to remove water from the simulated cross-section. The model also showed clearly that the response of the three-layered system, consisting of a highly weathered zone, a fractured transmissive zone and a less conductive lower schist zone, is governed mainly by the transmissivity and storage coefficient of the middle layer. The storage coefficient of the higher layer has little effect. A two-dimensional model in plan used a description of anisotropy to show that reverse flows can also occur even without a conducting Fault. Modelling of a three-dimensional region using discrete fractures showed that it is certainly possible to simulate systems like that observed at Koongarra, but that large amounts of data are probably needed to obtain realistic descriptions of the fracture networks. Inverse modelling

  3. The Basalt Waste Isolation Project technical program evaluation process: A criteria-based method

    International Nuclear Information System (INIS)

    Babad, H.; Evans, C.; Wolfe, B.A.

    1982-01-01

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the BWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (NWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP will be further formalized and further applied to the review of BWIP technical activities

  4. Basalt Waste Isolation Project Technical Program Evaluation Process: a criteria-based method

    International Nuclear Information System (INIS)

    Babad, H.; Evans, G.C.; Wolfe, B.A.

    1982-01-01

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the SWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (MWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP wll be further formalized and further applied to the review of BWIP technical activities

  5. Uranium Mill Tailings Remedial Action Project: technical approach document

    International Nuclear Information System (INIS)

    1986-05-01

    The Uranium Mill Tailings Radiation Control Act of 1978, PL95-604, grants the Secretary of Energy authority and responsibility to perform such actions as are necessary to minimize radiation health hazards and other environmental hazards from inactive uranium mill sites. These cleanup actions are to be performed in compliance with the EPA standards (40 CFR Part 192) which became final on March 7, 1983. This document describes the general technical approaches and design criteria that are adopted by the US Department of Energy (DOE) in order to implement Remedial Action Plans (RAPs) and final designs that comply with EPA standards

  6. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2004

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Roegner, Curtis; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Johnson, Gary E.; Sobocinski, Kathryn L.; Anderson, Michael G.; Ebberts, Blaine

    2005-12-15

    indicators for detecting a signal in the estuarine system resulting from the multiple projects were also reviewed, i.e. organic matter production, nutrient cycling, sedimentation, food webs, biodiversity, salmon habitat usage, habitat opportunity, and allometry. In subsequent work, this information will be used to calculate the over net effect on the ecosystem. To evaluate the effectiveness of habitat restoration actions in the lower Columbia River and estuary, a priority of this study has been to develop a set of minimum ecosystem monitoring protocols based on metrics important for the CRE. The metrics include a suite of physical measurements designed to evaluate changes in hydrological and topographic features, as well as biological metrics that will quantify vegetation and fish community structure. These basic measurements, intended to be conducted at all restoration sites in the CRE, will be used to (1) evaluate the effectiveness of various restoration procedures on target metrics, and (2) provide the data to determine the cumulative effects of many restoration projects on the overall system. A protocol manual is being developed for managers, professional researchers, and informed volunteers, and is intended to be a practical technical guide for the design and implementation of monitoring for the effects of restoration activities. The guidelines are intended to standardize the collection of data critical for analyzing the anticipated ecological change resulting from restoration treatments. Field studies in 2005 are planned to initiate the testing and evaluation of these monitoring metrics and protocols and initiate the evaluation of higher order metrics for cumulative effects.

  7. RIVER INTER-LINKING (RIL) PROJECT: A QUESTION ON INDIAN FEDERALISM.

    OpenAIRE

    Shazia Waheed; Pradip Kumar Jha.

    2017-01-01

    The Supreme Court of India, in 2002 directed the central government to link major Indian rivers within 10 years. In December 2002, the government appointed a task force on interlinking of 37 rivers and the dead line was extended by 2016. The RIL project not only raises national issue but also give way to international conflict in South Asia over sharing of river waters. The paper examines the impact of the RIL project on the paradigms and working of Indian federalism. It is based on triangula...

  8. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  9. Summary of the technical guidelines used in the project: The economics of greenhouse gas limitations

    International Nuclear Information System (INIS)

    Halsnaes, Kirsten

    1998-01-01

    This document is a summary version of the technical guidelines for climate change mitigation assessment developed as a part of the Global Environment Facility (GEF) project The Economics of Greenhouse Gas Limitations; Technical guidelines (UNEP 1998). The objectives of this project have been to support the development of a methodology, an implementing framework and a reporting system which countries can use in the construction of national climate change policies and in meeting their future reporting obligations under the FCCC. The methodological framework developed in the guidelines covers key economic concepts, scenario building, modelling tools and common assumptions. It was used by several country studies included in the project. (au)

  10. Monitoring and Evaluation of Environmental Flow Prescriptions for Five Demonstration Sites of the Sustainable Rivers Project

    Science.gov (United States)

    Konrad, Christopher P.

    2010-01-01

    The Nature Conservancy has been working with U.S. Army Corps of Engineers (Corps) through the Sustainable Rivers Project (SRP) to modify operations of dams to achieve ecological objectives in addition to meeting the authorized purposes of the dams. Modifications to dam operations are specified in terms of environmental flow prescriptions that quantify the magnitude, duration, frequency, and seasonal timing of releases to achieve specific ecological outcomes. Outcomes of environmental flow prescriptions implemented from 2002 to 2008 have been monitored and evaluated at demonstration sites in five rivers: Green River, Kentucky; Savannah River, Georgia/South Carolina; Bill Williams River, Arizona; Big Cypress Creek, Texas; and Middle Fork Willamette River, Oregon. Monitoring and evaluation have been accomplished through collaborative partnerships of federal and state agencies, universities, and nongovernmental organizations.

  11. Handling sediments in Dutch river management: The planning stage of the Maaswerken river widening project

    NARCIS (Netherlands)

    Meulen, M.J. van der; Rijnveld, M.; Gerrits, L.M.; Joziasse, J.; Heijst, M.W.I.M. van; Gruijters, S.H.L.L.

    2006-01-01

    Goals, Scope and Background. Faced with higher peak discharges in the foreseeable future, the Dutch government has decided to increase the discharge capacities of the Dutch Rhine and Meuse rivers. Instead of raising the dikes, river widening measures are to be undertaken, in and along the riverbed.

  12. Final Technical Report for Terabit-scale hybrid networking project.

    Energy Technology Data Exchange (ETDEWEB)

    Veeraraghavan, Malathi [Univ. of Virginia, Charlottesville, VA (United States)

    2015-12-12

    This report describes our accomplishments and activities for the project titled Terabit-Scale Hybrid Networking. The key accomplishment is that we developed, tested and deployed an Alpha Flow Characterization System (AFCS) in ESnet. It is being run in production mode since Sept. 2015. Also, a new QoS class was added to ESnet5 to support alpha flows.

  13. Columbia River Coordinated Information System (CIS); Data Catalog, 1992 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, Dick (Washington Department of Fisheries, Olympia, WA); Allen, Stan; Reece, Doug (Idaho Department of Fish and Game, Boise, ID)

    1993-05-01

    The Columbia River Coordinated Information system (CIS) Project started in 1989 to address regional data sharing. Coordinated exchange and dissemination of any data must begin with dissemination of information about those data, such as: what is available; where the data are stored; what form they exist in; who to contact for further information or access to these data. In Phase II of this Project (1991), a Data Catalog describing the contents of regional datasets and less formal data collections useful for system monitoring and evaluation projects was built to improve awareness of their existence. Formal datasets are described in a `Dataset Directory,` while collections of data are Used to those that collect such information in the `Data Item Directory.` The Data Catalog will serve regional workers as a useful reference which centralizes the institutional knowledge of many data contacts into a single source. Recommendations for improvement of the Catalog during Phase III of this Project include addressing gaps in coverage, establishing an annual maintenance schedule, and loading the contents into a PC-based electronic database for easier searching and cross-referencing.

  14. Three-dimensional digital projection in neurosurgical education: technical note.

    Science.gov (United States)

    Martins, Carolina; Ribas, Eduardo Carvalhal; Rhoton, Albert L; Ribas, Guilherme Carvalhal

    2015-10-01

    Three-dimensional images have become an important tool in teaching surgical anatomy, and its didactic power is enhanced when combined with 3D surgical images and videos. This paper describes the method used by the last author (G.C.R.) since 2002 to project 3D anatomical and surgical images using a computer source. Projecting 3D images requires the superposition of 2 similar but slightly different images of the same object. The set of images, one mimicking the view of the left eye and the other mimicking the view of the right eye, constitute the stereoscopic pair and can be processed using anaglyphic or horizontal-vertical polarization of light for individual use or presentation to larger audiences. Classically, 3D projection could be obtained by using a double set of slides, projected through 2 slide projectors, each of them equipped with complementary filters, shooting over a medium that keeps light polarized (a silver screen) and having the audience wear appropriate glasses. More recently, a digital method of 3D projection has been perfected. In this method, a personal computer is used as the source of the images, which are arranged in a Microsoft PowerPoint presentation. A beam splitter device is used to connect the computer source to 2 digital, portable projectors. Filters, a silver screen, and glasses are used, similar to the classic method. Among other advantages, this method brings flexibility to 3D presentations by allowing the combination of 3D anatomical and surgical still images and videos. It eliminates the need for using film and film developing, lowering the costs of the process. In using small, powerful digital projectors, this method substitutes for the previous technology, without incurring a loss of quality, and enhances portability.

  15. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Taddeucci, Joe [Dept. of Public Works, Boulder, CO (United States). Utilities Division

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  16. PROBLEM-SOLVING METHODS OF PROJECT MANAGEMENT OF TECHNICAL DEVELOPMENT FOR AGRICULTURAL PRODUCERS

    Directory of Open Access Journals (Sweden)

    Александр Васильевич СИДОРЧУК

    2015-05-01

    Full Text Available There have been proposed projects of technical development for agricultural producers. The conclusions about system features research projects that underlie the problem-solving methods of project management, have been made. There have been proved these projects (systems that can be simulated with the help of the research and formalization of many events. These events are components of the seven main factors of the agricultural production. The conclusion about the using the research method of the probabilistic nature events in the field of the crops projects with the help of the statistical and imitational models, have been developed. There have been considered the relation between the forecasting of functional marks of the technological systems and the estimation of their cost. And there have been found the optimum correspondence between parameters of the technical supply and planned features of the crops projects.

  17. DECOVALEX II PROJECT Technical Report - Task 2C

    International Nuclear Information System (INIS)

    Jing, L.; Stephansson, O.; Chijimatzu, M.; Tsang, C.F.

    1999-05-01

    The DECOVALEX II project is an international co-operative research project supported by a number of national radioactive waste management organizations of different countries. The project studied four tasks: Task 1: numerical simulation of the RCF3 pump test at Sellafield, UK; Task 2: numerical simulation of the in situ T-H-M experiment at Kamaishi Mine, Japan; Task 3: monitoring of current development in rock fracture research; and Task 4: report on treatment of T-H-M processes in Performance Assessment works for nuclear waste repositories. The project started in 1995 and is scheduled to be finalised in March, 1999. This report concerns the Task 2 of the DECOVALEX H project. Task 2 of the DECOVALEX II project is the numerical modelling of the in-situ T-H-M experiment of a fractured rock - buffer - heater system at Kamaishi Mine, Japan. The experiment was carried out inside a test pit drilled in the floor of a 5 x 7 m alcove excavated near an existing drift at the 550 m level. The test pit has a circular cross section of diameter 1.7 m and a depth of 5 m, filled with bentonite which contains an electric heater. Four research teams studied Task 2 with different computational models. The task is divided into three sub-tasks: Task 2A, Task 2B and Task 2C. Task 2A was defined as a blind prediction to the coupled hydro-mechanical behaviour of the fractured rocks due to the excavation of the test pit. The calibration of the numerical models against measured results of pore pressures, flow rates and rock deformation before filling up of the test pit formed Task 2B. These two sub-tasks were performed to establish well calibrated fields of hydraulic conductivity and mechanical deformability of the fractured rocks at the test site. They were necessary for further simulations on interactions between the rock and buffer materials during heating experiments, as required for Task 2C, with a higher level of confidence on rock mass models. Presented in this report is the

  18. DECOVALEX II PROJECT Technical Report - Task 2C

    Energy Technology Data Exchange (ETDEWEB)

    Jing, L.; Stephansson, O. [Royal Inst. of Tech., Stockholm (Sweden). Dept. of Civil and Environmental Engineering; Boergesson, L. [Clay Technology AB, IDEON Research Center, Lund (Sweden); Chijimatzu, M. [Japan Nuclear Cycle Development Inst., Ibaraki (Japan). Waste Management and Fuel Cycle Research Center; Kautsky, F. [Swedish Nuclear Power Inspectorate (SKI), Stockholm (Sweden); Tsang, C.F. [Lawrence Berkeley National Laboratory, Berkeley, CA (United States). Earth Science Div.

    1999-05-01

    The DECOVALEX II project is an international co-operative research project supported by a number of national radioactive waste management organizations of different countries. The project studied four tasks: Task 1: numerical simulation of the RCF3 pump test at Sellafield, UK; Task 2: numerical simulation of the in situ T-H-M experiment at Kamaishi Mine, Japan; Task 3: monitoring of current development in rock fracture research; and Task 4: report on treatment ofT-H-M processes in Performance Assessment works for nuclear waste repositories. The project started in 1995 and is scheduled to be finalised in March, 1999. This report concerns the Task 2 of the DECOVALEX H project. Task 2 of the DECOVALEX II project is the numerical modelling of the in-situ T-H-M experiment of a fractured rock - buffer - heater system at Kamaishi Mine, Japan. The experiment was carried out inside a test pit drilled in the floor of a 5 x 7 m alcove excavated near an existing drift at the 550 m level. The test pit has a circular cross section of diameter 1.7 m and a depth of 5 m, filled with bentonite which contains an electric heater. Four research teams studied Task 2 with different computational models. The task is divided into three sub-tasks: Task 2A, Task 2B and Task 2C. Task 2A was defined as a blind prediction to the coupled hydro-mechanical behaviour of the fractured rocks due to the excavation of the test pit. The calibration of the numerical models against measured results of pore pressures, flow rates and rock deformation before filling up of the test pit formed Task 2B. These two sub-tasks were performed to establish well calibrated fields of hydraulic conductivity and mechanical deformability of the fractured rocks at the test site. They were necessary for further simulations on interactions between the rock and buffer materials during heating experiments, as required for Task 2C, with a higher level of confidence on rock mass models. Presented in this report is the definition

  19. Crystalline Repository Project. Technical progress report, October 1982-March 1983

    International Nuclear Information System (INIS)

    1985-01-01

    This document reports the progress being made periodically on the development of a geologic repository in crystalline rock for the permanent disposal of high-level nuclear waste. The reporting elements are arranged by the work breakdown structure so that related studies are presented together. The studies are reported by the Office of Crystalline Respository Development (OCRD), a prime contractor of the US Department of Energy Repository Project Office. The studies include work by other prime contractors and by subcontractors to OCRD

  20. Technical contribution to the project and operation of pulsed columns

    International Nuclear Information System (INIS)

    Kromek, I.B.; Ikuta, A.

    1976-01-01

    Characteristics and factors that affect the performance of pulse columms used in the purification of metals as thorium, uranium and plutonium are described. The pulse generator and the control instrumentation of these columns are also described. This report is based mainly in the works made by Richardson and Platt and adaptations realized in the project and instalation of the first compound extraction-scrub pulse column in the CEQ/IEA (Sao Paulo, Brazil) [pt

  1. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  2. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  3. Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396

    International Nuclear Information System (INIS)

    Dunford, Gary; Williams, David; Smith, Rick

    2013-01-01

    The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near

  4. Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396

    Energy Technology Data Exchange (ETDEWEB)

    Dunford, Gary [AEM Consulting, LLC, 1201 Jadwin Avenue, Richland, WA 99352 (United States); Williams, David [WIT, Inc., 11173 Oak Fern Court, San Diego, CA 92131 (United States); Smith, Rick [Knowledge Systems Design, Inc., 13595 Quaker Hill Cross Rd, Nevada City, CA 95959 (United States)

    2013-07-01

    The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near

  5. Messiah College Biodiesel Fuel Generation Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Zummo, Michael M; Munson, J; Derr, A; Zemple, T; Bray, S; Studer, B; Miller, J; Beckler, J; Hahn, A; Martinez, P; Herndon, B; Lee, T; Newswanger, T; Wassall, M

    2012-03-30

    Many obvious and significant concerns arise when considering the concept of small-scale biodiesel production. Does the fuel produced meet the stringent requirements set by the commercial biodiesel industry? Is the process safe? How are small-scale producers collecting and transporting waste vegetable oil? How is waste from the biodiesel production process handled by small-scale producers? These concerns and many others were the focus of the research preformed in the Messiah College Biodiesel Fuel Generation project over the last three years. This project was a unique research program in which undergraduate engineering students at Messiah College set out to research the feasibility of small-biodiesel production for application on a campus of approximately 3000 students. This Department of Energy (DOE) funded research program developed out of almost a decade of small-scale biodiesel research and development work performed by students at Messiah College. Over the course of the last three years the research team focused on four key areas related to small-scale biodiesel production: Quality Testing and Assurance, Process and Processor Research, Process and Processor Development, and Community Education. The objectives for the Messiah College Biodiesel Fuel Generation Project included the following: 1. Preparing a laboratory facility for the development and optimization of processors and processes, ASTM quality assurance, and performance testing of biodiesel fuels. 2. Developing scalable processor and process designs suitable for ASTM certifiable small-scale biodiesel production, with the goals of cost reduction and increased quality. 3. Conduct research into biodiesel process improvement and cost optimization using various biodiesel feedstocks and production ingredients.

  6. Savannah River Ecology Laboratory. Annual technical progress report of ecological research, period ending July 31, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The Savannah River Ecology Laboratory (SREL) is a research unit of the University of Georgia (UGA) that is managed in conjunction with the University's Institute of Ecology. The laboratory's overall mission is to acquire and communicate knowledge of ecological processes and principles. SREL conducts basic and applied ecological research, as well as education and outreach programs, under an M ampersand O contract with the US Department of Energy at the Savannah River Site. Significant accomplishments were made during the year ending July 31, 1994 in the areas of research, education and service. Reviewed in this document are research projects in the following areas: Environmental Operations Support (impacted wetlands, streams, trace organics, radioecology, database synthesis, wild life studies, zooplankton, safety and quality assurance); wood stork foraging and breeding ecology; defence waste processing facility; environmental risk assessment (endangered species, fish, ash basin studies); ecosystem alteration by chemical pollutants; wetlands systems; biodiversity on the SRS; Environmental toxicology; environmental outreach and education; Par Pond drawdown studies in wildlife and fish and metals; theoretical ecology; DOE-SR National Environmental Research Park; wildlife studies. Summaries of educational programs and publications are also give

  7. Savannah River Ecology Laboratory. Annual technical progress report of ecological research, period ending July 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-31

    The Savannah River Ecology Laboratory (SREL) is a research unit of the University of Georgia (UGA) that is managed in conjunction with the University`s Institute of Ecology. The laboratory`s overall mission is to acquire and communicate knowledge of ecological processes and principles. SREL conducts basic and applied ecological research, as well as education and outreach programs, under an M&O contract with the US Department of Energy at the Savannah River Site. Significant accomplishments were made during the year ending July 31, 1994 in the areas of research, education and service. Reviewed in this document are research projects in the following areas: Environmental Operations Support (impacted wetlands, streams, trace organics, radioecology, database synthesis, wild life studies, zooplankton, safety and quality assurance); wood stork foraging and breeding ecology; defence waste processing facility; environmental risk assessment (endangered species, fish, ash basin studies); ecosystem alteration by chemical pollutants; wetlands systems; biodiversity on the SRS; Environmental toxicology; environmental outreach and education; Par Pond drawdown studies in wildlife and fish and metals; theoretical ecology; DOE-SR National Environmental Research Park; wildlife studies. Summaries of educational programs and publications are also give.

  8. Implementation of technical stage of ITER project in Kazakstan

    International Nuclear Information System (INIS)

    Shkol'nik, V.S.; Shemanskij, V.A.; Cherepnin, Yu.S.; Skoz, E.Ya.; Nazarenko, L.I.; Shestakov, V.P.; Tazhibaeva, I.L.

    1996-01-01

    The main executors of ITER project in Kazakstan are: National nuclear Centre; National Joint-stock Co. of the enterprises on atomic engineering and industry (KATEP) and Science and Research Inst. of Experimental and Theoretical Physics of the Kazakh National Univ. Principle directions of Kazakhstan Republic works in 1996/97 under the ITER project is possible to formulate as follows: - irradiation test of materials on the BN-350 reactor; -continuation of in-pile experiments on determination of deuterium interaction parameters with beryllium samples, manufactured by Ulba Metallurgical Plant (KATEP), using Research Water Heterogeneous Reactor; - conducting of in-pile experiments on determination of hydrogen isotope permeation parameters through vanadium alloys using Research Water Heterogeneous Reactor. Conducting of out-pile experiments with beryllium, and vanadium alloys; - investigation of beryllium structure and properties in respect to hydrogen in condition, simulating gas impurities inventory, under thermal and neutron influence; -simulation of plasma disruption on divertor; -simulation of water steam interaction with beryllium; - determination of hydrogen permeation parameters for various materials with 'in situ' surface by electronic spectroscopy; -development of manufacturing technology of beryllium connections with copper alloys

  9. Umatilla River Basin Anadromus Fish Habitat Enhancement Project. 1994 Annual report

    International Nuclear Information System (INIS)

    Shaw, R.T.

    1994-05-01

    The Umatilla Basin Anadromous Fish Habitat Enhancement Project targets the improvement of water quality and restoration of riparian areas, holding, spawning and rearing habitats of steelhead, spring and fall chinook and coho salmon. The project focused on implementing cooperative instream and riparian habitat improvements on private lands on the Umatilla Indian Reservation from April 1, 1988 to March 31, 1992. These efforts resulted in enhancement of the lower 1/4 mile of Boston Canyon Creek, the lower 4 river miles of Meacham Creek and 3.2 river miles of the Umatilla River in the vicinity of Gibbon, Oregon. In 1993, the project shifted emphasis to a comprehensive watershed approach, consistent with other basin efforts, and began to identify upland and riparian watershed-wide causative factors impacting fisheries habitat and natural fisheries production capabilities throughout the Umatilla River Watershed. During the 1994--95 project period, a one river mile demonstration project was implemented on two privately owned properties on Wildhorse Creek. This was the first watershed improvement project to be implemented by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) off of the Reservation

  10. Technical clarity in inter-agency negotiations: Lessons from four hydropower projects

    Science.gov (United States)

    Burkardt, Nina; Lamb, Berton Lee; Taylor, Jonathan G.; Waddle, Terry J.

    1995-01-01

    We investigated the effect of technical clarity on success in multi-party negotiations in the Federal Energy Regulatory Commission (FERC) licensing process. Technical clarity is the shared understanding of dimensions such as the geographic extent of the project, range of flows to be considered, important species and life stages, and variety of water uses considered. The results of four hydropower licensing consultations are reported. Key participants were interviewed to ascertain the level of technical clarity present during the consultations and the degree to which the consultations were successful. Technical clarity appears to be a prerequisite for successful outcomes. Factors that enhance technical clarity include simple project design, new rather than existing projects, precise definition of issues, a sense of urgency to reach agreement, a sense of fairness among participants, and consistency in participation. Negotiators should not neglect the critical pre-negotiation steps of defining technical issues and determining appropriate studies, deciding how to interpret studies, and agreeing on responses to study results.

  11. Flood management selections for the Yangtze River midstream after the Three Gorges Project operation

    Science.gov (United States)

    Fang, Hongwei; Han, Dong; He, Guojian; Chen, Minghong

    2012-04-01

    SummaryAfter the Yangtze River was closed by the Three Gorges Project (TGP) in 2003, erosion occurred from the dam site to the river mouth, especially in the middle and lower reaches of the Yangtze River. However, in some local areas of Chenglingji reach which holds the key position for flood management, there is actually deposition in contrast to the expected erosion. In this paper, a one dimensional mathematical model of the river network with sediment transport is used as the tool to simulate flow and fluvial processes. The calculation domain is from Yichang, which is downstream of the dam, to Hankou, the controlling node of flood management, 694 km long in total. The model is calibrated based on the field data of hydrology and sediment transport during the period from October 2003 to October 2008. Then the model is utilized to simulate the erosion and deposition of the middle and lower reaches of the Yangtze River in the next two decades, and produce the results of a new river channel after river bed deformation occurs. The typical flood processes of 1954 and 1998 in the Yangtze River basin are used to check the flood management scheme for the research area, and results show that water storage of Three Gorges Reservoir (TGR) and a flood diversion program downstream of the Yangtze River should be taken into consideration.

  12. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  13. 78 FR 56692 - Colorado River Storage Project-Rate Order No. WAPA-161

    Science.gov (United States)

    2013-09-13

    ... existing Salt Lake City Area Integrated Projects (SLCA/IP) Firm Power Rate and the Colorado River Storage...-6372, email [email protected] , or Mr. Rodney Bailey, Power Marketing Manager, CRSP Management Center...: Western Area Power Administration Temporary Extension for Salt Lake City Area Integrated Projects Firm...

  14. Technical and scientific report of the Alto project

    CERN Document Server

    Essabaa, S; Grialou, D; Ibrahim, F; Le Scornet, J C

    2002-01-01

    The Alto project means the installation of an electron linear accelerator inside the experimental area of the tandem accelerator of the nuclear physics institute of Orsay (IPNO, France). This linear accelerator comes from CERN where it was operating as a pre-injector for LEP. This equipment will allow IPNO'teams to perform fast kinetics studies in a domain different from that of ELYSE accelerator. The time resolution will not be as high as that of ELYSE (picosecond) but will be sufficient (microsecond) to produce free radicals in aqueous and gaseous media. The main expectations of this installation can be classified according 3 axis: 1) basic research (mainly the study of nuclear matter through photo-fission, 2) research and development of accelerators (by providing a test bench for new high frequency systems and superconducting components), and 3) applied research for industry concerning: biochemistry under irradiation, radiation sensibility, DNA breaking, food and drug sterilization and behaviour of electro...

  15. The ARAMIS project: a concept robot and technical design.

    Science.gov (United States)

    Colizzi, Lucio; Lidonnici, Antonio; Pignolo, Loris

    2009-11-01

    To describe the ARAMIS (Automatic Recovery Arm Motility Integrated System) project, a concept robot applicable in the neuro-rehabilitation of the paretic upper limb after stroke. Methods, results and conclusion: The rationale and engineering of a state-of-the-art, hardware/software integrated robot system, its mechanics, ergonomics, electric/electronics features providing control, safety and suitability of use are described. An ARAMIS prototype has been built and is now available for clinical tests. It allows the therapist to design neuro-rehabilitative (synchronous or asynchronous) training protocols in which sample exercises are generated by a single exoskeleton (operated by the patient's unaffected arm or by the therapist's arm) and mirrored in real-time or offline by the exoskeleton supporting the paretic arm.

  16. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  17. Technical Description Lillgrund Wind Power Plant. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Jeppsson, Joakim; Larsen, Poul Erik; Larsson, Aake [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2008-09-15

    Lillgrund offshore wind power plant comprises 48 wind turbines, each rated at 2.3 MW, bringing the total wind farm capacity to 110 MW. The Lillgrund offshore wind power plant is located in a shallow area of Oeresund, 7 km off the coast of Sweden and 7 km south from the Oeresund Bridge connecting Sweden and Denmark. An average wind speed of around 8,5 m/s at hub height, combined with a relatively low water depth of 4 to 8 meters makes it economically feasible to build here. Vattenfall Vindkraft AB is the owner and operator of Lillgrund offshore wind power plant. Lillgrund is a Swedish pilot project supported by the Swedish Energy Agency. The bidding process was completed during 2005 and the offshore power plant was constructed in the period 2006 to 2007. The wind farm was constructed on time and has now been successfully operational since December 2007. There is, however, always potential for improvement and the aim of this report has been to determine and highlight these areas. It is worth noting out that only the electrical system and the foundations are tailor made at offshore wind power plants. The wind turbines are more or less standard products with none or very limited possibilities for project specific design changes. Geotechnical investigations are expensive and it can be difficult to balance the risks as well as the benefits of this expense in the early phases of a large infrastructure project. As a whole, the geotechnical surveys at Lillgrund proved to be useful. They identified potential issues, such as the fact that extra excavation was required for two of the foundations. It also revealed the location of a small number of boulders that would have to be removed. Vattenfall requested a complete study of the electrical system for Lillgrund to be delivered with the bids. That request was not met. Instead Siemens Wind Power began a complete electrical system study after being awarded the Contract. The electrical system study was completed during the

  18. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  19. Technical and scientific report of the Alto project

    International Nuclear Information System (INIS)

    Essabaa, S.; Gardes, D.; Grialou, D.; Ibrahim, F.; Le Scornet, J.C.

    2002-01-01

    The Alto project means the installation of an electron linear accelerator inside the experimental area of the tandem accelerator of the nuclear physics institute of Orsay (IPNO, France). This linear accelerator comes from CERN where it was operating as a pre-injector for LEP. This equipment will allow IPNO'teams to perform fast kinetics studies in a domain different from that of ELYSE accelerator. The time resolution will not be as high as that of ELYSE (picosecond) but will be sufficient (microsecond) to produce free radicals in aqueous and gaseous media. The main expectations of this installation can be classified according 3 axis: 1) basic research (mainly the study of nuclear matter through photo-fission, 2) research and development of accelerators (by providing a test bench for new high frequency systems and superconducting components), and 3) applied research for industry concerning: biochemistry under irradiation, radiation sensibility, DNA breaking, food and drug sterilization and behaviour of electronic components under irradiation. This rapport details the research program that could be achieved with this equipment, describes its contributions in terms of economic development, cooperation with industry, student training, and specifies the needed investment and the operating and maintenance costs. (A.C.)

  20. Guanacaste Geothermal Project. Technical prefeasibility report. Annex C. Electric resistivity

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    This report is the third of six annexes to the Summary Report on the First Phase of the Guanacaste Geothermal Project. The studies covered an area of 500 km/sup 2/ on the SW flanks of the Rincon de la Vieja and Miravalles volcanoes of the Guanacaste Volcanic Range in NW Costa Rica, and were aimed at locating zones of high geothermal gradient, and reconstruction of the stratigraphic column. The formations in the area under study can be grouped into six resistivity ranges, varying from less than 5 to more than 200 ohm-meters. Values from 200 to as high as 30,000 ohm-meters generally correspond to fractured and porous lavas, their fracturing and porosity, as well as their drainability, increasing with resistivity. The values above 100 ohm-meters were recorded in zones of recent lava flows, in spurs of the volcanoes Rincon de la Vieja and Santa Maria, and in the slopes of the Miravalles volcano, and correspond to shallow formations (maximum depths of 150 meters) which may constitute recharge zones for the underground aquifiers. The values in the 100 to 200 ohm-meter range were generally recorded directly under layers constituted by drained, porous lavas, or under shallow layers where no recent lavas are present. The third group comprises materials with resistivities in the 25 to 100 ohm-meter range, occurring at two different depth levels: a deep one (more than 1000 meters) and a shallow one (less than 400 meters). Resistivities less than 25 ohm-meters were recorded at depths of 250 meters and more, and may correspond to material typical of the Aguacate formation, which probably constitutes the reservoir rock of the geothermal fluids. In order to locate the zones of most geothermal interest, this range was classified into the three remaining of the six groups, viz 10 to 25, 5 to 10, and less than 5 ohm-meters, the last group appearing to be that of greatest geothermal potential.

  1. San Jacinto River oil spill: wetland bioremediation project

    International Nuclear Information System (INIS)

    Mills, M.A.; Bonner, J.S.

    1996-01-01

    Gasoline, diesel and unrefined Arabian light crude oil were accidentally released into the San Jacinto River after a series of pipelines ruptured. Natural removal processes (volatilization, dissolution, weathering), fire, and the spill clean-up effort, removed approximately 95% of the petroleum. The area where residual oil was found was an estuarine wetland on the lower San Jacinto River. Samples were collected from 21 study areas and an evaluation of the varying levels of bioremediation was conducted. Phase one has been completed and involved the evaluation of the natural recovery of oil from the spill. Phase two was still in progress and involved the addition of inorganic nutrients and the alternate electron acceptor to enhance the biodegradation of the petroleum. Results showed that biodegradation was responsible for much of the reduction of certain components in petroleum within the first 150 days. 12 refs., 8 figs

  2. Hood River and Pelton Ladder monitoring and evaluation project and Hood River fish habitat project : annual progress report 1999-2000.; ANNUAL

    International Nuclear Information System (INIS)

    Lambert, Michael B.; McCanna, Joseph P.; Jennings, Mick

    2001-01-01

    The Hood River subbasin is home to four species of anadromous salmonids: chinook salmon (Oncorhynchus tshawytscha), coho salmon (Oncorhynchus kisutch), steelhead (Oncorhynchus mykiss), and sea run cutthroat trout (Salmo clarki). Indigenous spring chinook salmon were extirpated during the late 1960's. The naturally spawning spring chinook salmon currently present in the subbasin are progeny of Deschutes stock. Historically, the Hood River subbasin hatchery steelhead program utilized out-of-basin stocks for many years. Indigenous stocks of summer and winter steelhead were listed in March 1998 by National Marine Fisheries Service (NMFS) under the Endangered Species Act (ESA) as a ''Threatened'' Species along with similar genetically similar steelhead in the Lower Columbia Basin. This annual report summarizes work for two consecutive contract periods: the fiscal year (FY) 1999 contract period was 1 October, 1998 through 30 September, 1999 and 1 October, 1999 through 30 September, 2000 for FY 2000. Work implemented during FY 1999 and FY 2000 included (1) acclimation of hatchery spring chinook salmon and hatchery summer and winter steelhead smolts, (2) spring chinook salmon spawning ground surveys on the West Fork Hood River (3) genetic analysis of steelhead and cutthroat[contractual service with the ODFW], (4) Hood River water temperature studies, (5) Oak Springs Hatchery (OSH) and Round Butte Hatchery (RBH) coded-wire tagging and clipping evaluation, (6) preparation of the Hood River Watershed Assessment (Coccoli et al., December 1999) and the Fish Habitat Protection, Restoration, and Monitoring Plan (Coccoli et al., February 2000), (7) project implementation of early action habitat protection and restoration projects, (8) Pelton Ladder evaluation studies, (9) management oversight and guidance to BPA and ODFW engineering on HRPP facilities, and (10) preparation of an annual report summarizing project objectives for FY 1999 and FY 2000

  3. Influence of the Three Gorges Project on saltwater intrusion in the Yangtze River Estuary

    Science.gov (United States)

    An, Qiang; Wu, Yanqing; Taylor, Shauna; Zhao, Bin

    2009-02-01

    The Three Gorges Project (TGP) is a transcentury project that has aroused world attention. It is expected that the flow velocity and runoff of the Yangtze River will be changed after the project has been accomplished. Consequently, however, the ecological environment in the Yangtze River Basin, particularly in the estuary region, will be affected. Salinity intrusion into the Yangtze River estuary, in general, is mostly affected by the Yangtze River discharge and its external tidal level. This paper focuses on examining the influence of changes in runoff on salinity value. The question, to which should be paid attention is: how is the interaction between changes in runoff of the Yangtze River and salinity distribution in the Yangtze River estuary, China? In this research, a three-dimensional model has been used to identify the effects of runoff change on salinity distribution. The drawn conclusion is that the change of salinity is influenced by discharge variation. Positive and negative impacts of TGP would both turn up but in different period. In sum, TGP is in favor of restraining saltwater intrusion. Nevertheless a suitable method should be found to resolve its negative influences.

  4. Sediment cores and chemistry for the Kootenai River White Sturgeon Habitat Restoration Project, Boundary County, Idaho

    Science.gov (United States)

    Barton, Gary J.; Weakland, Rhonda J.; Fosness, Ryan L.; Cox, Stephen E.; Williams, Marshall L.

    2012-01-01

    The Kootenai Tribe of Idaho, in cooperation with local, State, Federal, and Canadian agency co-managers and scientists, is assessing the feasibility of a Kootenai River habitat restoration project in Boundary County, Idaho. This project is oriented toward recovery of the endangered Kootenai River white sturgeon (Acipenser transmontanus) population, and simultaneously targets habitat-based recovery of other native river biota. Projects currently (2010) under consideration include modifying the channel and flood plain, installing in-stream structures, and creating wetlands to improve the physical and biological functions of the ecosystem. River restoration is a complex undertaking that requires a thorough understanding of the river. To assist in evaluating the feasibility of this endeavor, the U.S. Geological Survey collected and analyzed the physical and chemical nature of sediment cores collected at 24 locations in the river. Core depths ranged from 4.6 to 15.2 meters; 21 cores reached a depth of 15.2 meters. The sediment was screened for the presence of chemical constituents that could have harmful effects if released during restoration activities. The analysis shows that concentrations of harmful chemical constituents do not exceed guideline limits that were published by the U.S. Army Corps of Engineers in 2006.

  5. THE SLOAN DIGITAL SKY SURVEY REVERBERATION MAPPING PROJECT: TECHNICAL OVERVIEW

    Energy Technology Data Exchange (ETDEWEB)

    Shen, Yue [Carnegie Observatories, 813 Santa Barbara Street, Pasadena, CA 91101 (United States); Brandt, W. N. [Department of Astronomy and Astrophysics, The Pennsylvania State University, University Park, PA 16802 (United States); Dawson, Kyle S. [Department of Physics and Astronomy, University of Utah, 115 South 1400 East, Salt Lake City, UT 84112 (United States); Hall, Patrick B. [Department of Physics and Astronomy, York University, Toronto, ON M3J 1P3 (Canada); McGreer, Ian D.; Fan, Xiaohui [Steward Observatory, The University of Arizona, 933 North Cherry Avenue, Tucson, AZ 85721-0065 (United States); Anderson, Scott F. [Astronomy Department, University of Washington, Box 351580, Seattle, WA 98195 (United States); Chen, Yuguang [Department of Astronomy, School of Physics, Peking University, Beijing 100871 (China); Denney, Kelly D. [Department of Astronomy, The Ohio State University, 140 West 18th Avenue, Columbus, OH 43210 (United States); Eftekharzadeh, Sarah [Department of Physics and Astronomy, University of Wyoming, 1000 East University Avenue, Laramie, WY 82071 (United States); Gao, Yang [Department of Engineering Physics and Center for Astrophysics, Tsinghua University, Beijing 100084 (China); Green, Paul J. [Harvard-Smithsonian Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States); Greene, Jenny E. [Department of Astrophysical Sciences, Princeton University, Princeton, NJ 08544 (United States); Ho, Luis C. [Kavli Institute for Astronomy and Astrophysics, Peking University, Beijing 100871 (China); Horne, Keith [SUPA Physics/Astronomy, University of St. Andrews, St. Andrews KY16 9SS (United Kingdom); Jiang, Linhua [School of Earth and Space Exploration, Arizona State University, Tempe, AZ 85287-1504 (United States); Kelly, Brandon C. [Department of Physics, Broida Hall, University of California, Santa Barbara, CA 93107 (United States); and others

    2015-01-01

    The Sloan Digital Sky Survey Reverberation Mapping (SDSS-RM) project is a dedicated multi-object RM experiment that has spectroscopically monitored a sample of 849 broad-line quasars in a single 7 deg{sup 2} field with the SDSS-III Baryon Oscillation Spectroscopic Survey spectrograph. The RM quasar sample is flux-limited to i {sub psf} = 21.7 mag, and covers a redshift range of 0.1 < z < 4.5 without any other cuts on quasar properties. Optical spectroscopy was performed during 2014 January-July dark/gray time, with an average cadence of ∼4 days, totaling more than 30 epochs. Supporting photometric monitoring in the g and i bands was conducted at multiple facilities including the Canada-France-Hawaii Telescope (CFHT) and the Steward Observatory Bok telescope in 2014, with a cadence of ∼2 days and covering all lunar phases. The RM field (R.A., decl. = 14:14:49.00, +53:05:00.0) lies within the CFHT-LS W3 field, and coincides with the Pan-STARRS 1 (PS1) Medium Deep Field MD07, with three prior years of multi-band PS1 light curves. The SDSS-RM six month baseline program aims to detect time lags between the quasar continuum and broad line region (BLR) variability on timescales of up to several months (in the observed frame) for ∼10% of the sample, and to anchor the time baseline for continued monitoring in the future to detect lags on longer timescales and at higher redshift. SDSS-RM is the first major program to systematically explore the potential of RM for broad-line quasars at z > 0.3, and will investigate the prospects of RM with all major broad lines covered in optical spectroscopy. SDSS-RM will provide guidance on future multi-object RM campaigns on larger scales, and is aiming to deliver more than tens of BLR lag detections for a homogeneous sample of quasars. We describe the motivation, design, and implementation of this program, and outline the science impact expected from the resulting data for RM and general quasar science.

  6. THE SLOAN DIGITAL SKY SURVEY REVERBERATION MAPPING PROJECT: TECHNICAL OVERVIEW

    International Nuclear Information System (INIS)

    Shen, Yue; Brandt, W. N.; Dawson, Kyle S.; Hall, Patrick B.; McGreer, Ian D.; Fan, Xiaohui; Anderson, Scott F.; Chen, Yuguang; Denney, Kelly D.; Eftekharzadeh, Sarah; Gao, Yang; Green, Paul J.; Greene, Jenny E.; Ho, Luis C.; Horne, Keith; Jiang, Linhua; Kelly, Brandon C.

    2015-01-01

    The Sloan Digital Sky Survey Reverberation Mapping (SDSS-RM) project is a dedicated multi-object RM experiment that has spectroscopically monitored a sample of 849 broad-line quasars in a single 7 deg 2 field with the SDSS-III Baryon Oscillation Spectroscopic Survey spectrograph. The RM quasar sample is flux-limited to i psf = 21.7 mag, and covers a redshift range of 0.1 < z < 4.5 without any other cuts on quasar properties. Optical spectroscopy was performed during 2014 January-July dark/gray time, with an average cadence of ∼4 days, totaling more than 30 epochs. Supporting photometric monitoring in the g and i bands was conducted at multiple facilities including the Canada-France-Hawaii Telescope (CFHT) and the Steward Observatory Bok telescope in 2014, with a cadence of ∼2 days and covering all lunar phases. The RM field (R.A., decl. = 14:14:49.00, +53:05:00.0) lies within the CFHT-LS W3 field, and coincides with the Pan-STARRS 1 (PS1) Medium Deep Field MD07, with three prior years of multi-band PS1 light curves. The SDSS-RM six month baseline program aims to detect time lags between the quasar continuum and broad line region (BLR) variability on timescales of up to several months (in the observed frame) for ∼10% of the sample, and to anchor the time baseline for continued monitoring in the future to detect lags on longer timescales and at higher redshift. SDSS-RM is the first major program to systematically explore the potential of RM for broad-line quasars at z > 0.3, and will investigate the prospects of RM with all major broad lines covered in optical spectroscopy. SDSS-RM will provide guidance on future multi-object RM campaigns on larger scales, and is aiming to deliver more than tens of BLR lag detections for a homogeneous sample of quasars. We describe the motivation, design, and implementation of this program, and outline the science impact expected from the resulting data for RM and general quasar science

  7. Mississippi Ethanol Gasification Project, Final Scientific / Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Pearson, Larry, E.

    2007-04-30

    The Mississippi Ethanol (ME) Project is a comprehensive effort to develop the conversion of biomass to ethanol utilizing a proprietary gasification reactor technology developed by Mississippi Ethanol, LLC. Tasks were split between operation of a 1/10 scale unit at the Diagnostic Instrumentation and Analysis Laboratory (DIAL) of Mississippi State University (MSU) and the construction, development, and operation of a full scale pilot unit located at the ME facility in Winona, Mississippi. In addition to characterization of the ME reactor gasification system, other areas considered critical to the operational and economic viability of the overall ME concept were evaluated. These areas include syngas cleanup, biological conversion of syngas to alcohol, and effects of gasification scale factors. Characterization of run data from the Pre-Pilot and Pilot Units has allowed development of the factors necessary for scale-up from the small unit to the larger unit. This scale range is approximately a factor of 10. Particulate and tar sampling gave order of magnitude values for preliminary design calculations. In addition, sampling values collected downstream of the ash removal system show significant reductions in observed loadings. These loading values indicate that acceptable particulate and tar loading rates could be attained with standard equipment additions to the existing configurations. Overall operation both the Pre-Pilot and Pilot Units proceeded very well. The Pilot Unit was operated as a system, from wood receiving to gas flaring, several times and these runs were used to address possible production-scale concerns. Among these, a pressure feed system was developed to allow feed of material against gasifier system pressure with little or no purge requirements. Similarly, a water wash system, with continuous ash collection, was developed, installed, and tested. Development of a biological system for alcohol production was conducted at Mississippi State University with

  8. Change In Course Pattern Of The Teesta River: After Effect Of An Engineering Project

    Science.gov (United States)

    Ashrafi, Z. M.; Shuvo, S. D.; Mahmud, M. S.

    2016-12-01

    Bangladesh is blessed by rivers that contribute to country's agriculture, landscape development and water supply. Due to nature of the river's flow and morphology, several engineering project have been initiated to enhance its utility, Teesta barrage was one of them. After two decades of its construction in Northern Bangladesh, several study identified major impacts on local ecosystem due to hindrance in water flow. However, how Teesta River evolved in last 25 years after the barrage construction, has not been quantified yet. This study quantifies the downstream evolution of Teesta River in after-construction period (1990-2015). Time series earth observation satellite (Landsat) data and geo-spatial techniques have been utilized to understand the changes in course pattern. Besides, sinuosity index has been used to quantify it. Analysis shows that the river is becoming more braided with the rise of numerous `Char' areas (islands); as well as bifurcation of the main channel, creating newer channels increasingly. Statistically significant changes in Sinuosity Index (SI) of the Teesta river has found in post construction period. In some locations SI increased which indicate that the river is becoming more and more winding than straight it used to be around 1990. It is also found that the river is shifting towards the east where the number of human settlement is higher. The rate of shifting has accelerated during the 2000s. There are places where the course has moved about 3 kilometers from its earlier course. Therefore, higher number of human settlements are in threat of river bank erosion in recent years. River bank management should be developed considering the pattern of course change so that rural settlement can save from destructive river bank erosion.

  9. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  10. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  11. TANK FARM REMEDIATION TECHNOLOGY DEVELOPMENT PROJECT AN EXERCISE IN TECHNICAL & REGULATORY COLLABORATION

    Energy Technology Data Exchange (ETDEWEB)

    JARAYSI, M.N.

    2007-01-08

    The Tank Farm Remediation Technology Development Project at the Hanford Site focuses on waste storage tanks, pipelines and associated ancillary equipment that are part of the C-200 single-shell tank (SST) farm system located in the C Tank Farm. The purpose of the project is to obtain information on the implementation of a variety of closure activities and to answer questions on technical, operational and regulatory issues associated with closure.

  12. TANK FARM REMEDIATION TECHNOLOGY DEVELOPMENT PROJECT AN EXERCISE IN TECHNICAL and REGULATORY COLLABORATION

    International Nuclear Information System (INIS)

    JARAYSI, M.N.

    2007-01-01

    The Tank Farm Remediation Technology Development Project at the Hanford Site focuses on waste storage tanks, pipelines and associated ancillary equipment that are part of the C-200 single-shell tank (SST) farm system located in the C Tank Farm. The purpose of the project is to obtain information on the implementation of a variety of closure activities and to answer questions on technical, operational and regulatory issues associated with closure

  13. Reaching for 100% participation in a utility conservation programme: the Hood River project

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, Eric

    1989-04-01

    The Hood River Conservation Project (HRCP) was a major residential retrofit demonstration project. The project was intended to install as many cost-effective retrofit measures in all electrically heated homes in Hood River, OR, USA. To achieve 100% participation, HRCP offered a package of 'super' retrofit measures and paid for installation of these measures. Almost all (91%) of the eligible households participated, in stark contrast to the much lower participation levels achieved in other residential conservation programmes. Also, unlike other programmes, HRCP attracted larger fractions of traditionally hard-to-reach groups: low-income households; occupants of multifamily units; and renters. The key factors leading to this phenomenal success include: the offer of free retrofits; determination on the part of staff to enlist every eligible household; the use of community-based marketing approaches; and reliance on extensive word-of-mouth among Hood River residents. (author).

  14. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Data Report

    Energy Technology Data Exchange (ETDEWEB)

    Passell, Howard D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Barber, David S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Betsill, J. David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Littlefield, Adriane C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Mohagheghi, Amir H. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Shanks, Sonoya T. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Yuldashev, Bekhzad [Inst. of Nuclear Physics, Tashkent (Uzbekistan); Saalikhbaev, Umar [Inst. of Nuclear Physics, Tashkent (Uzbekistan); Radyuk, Raisa [Inst. of Nuclear Physics, Tashkent (Uzbekistan); Djuraev, Akram [Tajik Academy of Sciences, Dushanbe (Tajikistan); Djuraev, Anwar [Tajik Academy of Sciences, Dushanbe (Tajikistan); Vasilev, Ivan [Inst. of Physics, Bishkek (Kyrgyzstan); Tolongutov, Bajgabyl [Inst. of Physics, Bishkek (Kyrgyzstan); Valentina, Alekhina [Inst. of Physics, Bishkek (Kyrgyzstan); Solodukhin, Vladimir [Inst. of Nuclear Physics, Almaty (Kazakhstan); Pozniak, Victor [Inst. of Nuclear Physics, Almaty (Kazakhstan)

    2003-04-01

    The Navruz Project is a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan, and facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. The Project also collects data on basic water quality parameters. Data obtained in this project are shared among all participating countries and the public through a world-wide web site (http://www.cmc.sandia.org/Central/centralasia.html), and are available for use in further studies and in regional transboundary water resource management efforts. This report includes graphs showing selected data from the Fall 2000 and Spring 2001 sampling seasons. These data include all parameters grouped into six regions, including main rivers and some tributaries in the Amu Darya and Syr Darya river systems. This report also assembles all data (in tabular form) generated by the project from Fall 2000 through Fall 2001. This report comes as the second part of a planned three-part reporting process. The first report is the Sampling and Analysis Plan and Operational Manual, SAND 2002-0484. This is the second report.

  15. Promoting Gender Parity in Basic Education: Lessons from a Technical Cooperation Project in Yemen

    Science.gov (United States)

    Yuki, Takako; Mizuno, Keiko; Ogawa, Keiichi; Mihoko, Sakai

    2013-01-01

    Many girls are not sent to school in Yemen, despite basic education being free as well as compulsory for all children aged 6-15. Aiming to improve girls' enrollment by increasing parental and community involvement, the Japan International Cooperation Agency (JICA) offered a technical cooperation project in June 2005 called Broadening Regional…

  16. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    Science.gov (United States)

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  17. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    Science.gov (United States)

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  18. Challenge Study: A Project-Based Learning on a Wireless Communication System at Technical High School

    Science.gov (United States)

    Terasawa, Ikuo

    2016-01-01

    The challenge study is a project based learning curriculum at Technical High School aimed at the construction of a wireless communication system. The first period was engineering issues in the construction of an artificial satellite and the second period was a positional locating system based on the general purpose wire-less device--ZigBee device.…

  19. Technical project of a solar water heating system for Hostal FRATERNIDAD, Santiago de Cuba

    International Nuclear Information System (INIS)

    Arzuaga Machado, Yusnel; Torres Ten, Alonso; Fonseca Fonseca, Susana; Fuetes lombá, Osmanys; Massipe Hernández, J. Raúl; Gonzalez, Wagner Roberto

    2017-01-01

    It is presented the technical project of a solar water heating system for Hostal FRATERNIDAD, Santiago de Cuba, Cuba, 20 Cabannas type tourism and a one of 2 square meter flat solar collector will be used, with a storage tank of 200 liters capacity, that is to say one system per cabin. (author)

  20. CHALLENGES AND OPPORTUNITIES--INTEGRATED LIFE-CYCLE OPTIMIZATION INITIATIVES FOR THE HANFORD RIVER PROTECTION PROJECT--WASTE TREATMENT PLANT

    International Nuclear Information System (INIS)

    Auclair, K. D.

    2002-01-01

    This paper describes the ongoing integrated life-cycle optimization efforts to achieve both design flexibility and design stability for activities associated with the Waste Treatment Plant at Hanford. Design flexibility is required to support the Department of Energy Office of River Protection Balance of Mission objectives, and design stability to meet the Waste Treatment Plant construction and commissioning requirements in order to produce first glass in 2007. The Waste Treatment Plant is a large complex project that is driven by both technology and contractual requirements. It is also part of a larger overall mission, as a component of the River Protection Project, which is driven by programmatic requirements and regulatory, legal, and fiscal constraints. These issues are further complicated by the fact that both of the major contractors involved have a different contract type with DOE, and neither has a contract with the other. This combination of technical and programmatic drivers, constraints, and requirements will continue to provide challenges and opportunities for improvement and optimization. The Bechtel National, Inc. team is under contract to engineer, procure, construct, commission and test the Waste Treatment Plant on or ahead of schedule, at or under cost, and with a throughput capacity equal to or better than specified. The Department of Energy is tasked with the long term mission of waste retrieval, treatment, and disposal. While each mission is a compliment and inextricably linked to one another, they are also at opposite ends of the spectrum, in terms of expectations of one another. These mission requirements, that are seemingly in opposition to one another, pose the single largest challenge and opportunity for optimization: one of balance. While it is recognized that design maturation and optimization are the normal responsibility of any engineering firm responsible for any given project, the aspects of integrating requirements and the management

  1. South Asia river-flow projections and their implications for water resources

    Science.gov (United States)

    Mathison, C.; Wiltshire, A. J.; Falloon, P.; Challinor, A. J.

    2015-12-01

    South Asia is a region with a large and rising population, a high dependence on water intense industries, such as agriculture and a highly variable climate. In recent years, fears over the changing Asian summer monsoon (ASM) and rapidly retreating glaciers together with increasing demands for water resources have caused concern over the reliability of water resources and the potential impact on intensely irrigated crops in this region. Despite these concerns, there is a lack of climate simulations with a high enough resolution to capture the complex orography, and water resource analysis is limited by a lack of observations of the water cycle for the region. In this paper we present the first 25 km resolution regional climate projections of river flow for the South Asia region. Two global climate models (GCMs), which represent the ASM reasonably well are downscaled (1960-2100) using a regional climate model (RCM). In the absence of robust observations, ERA-Interim reanalysis is also downscaled providing a constrained estimate of the water balance for the region for comparison against the GCMs (1990-2006). The RCM river flow is routed using a river-routing model to allow analysis of present-day and future river flows through comparison with available river gauge observations. We examine how useful these simulations are for understanding potential changes in water resources for the South Asia region. In general the downscaled GCMs capture the seasonality of the river flows but overestimate the maximum river flows compared to the observations probably due to a positive rainfall bias and a lack of abstraction in the model. The simulations suggest an increasing trend in annual mean river flows for some of the river gauges in this analysis, in some cases almost doubling by the end of the century. The future maximum river-flow rates still occur during the ASM period, with a magnitude in some cases, greater than the present-day natural variability. Increases in river flow

  2. Changes in groundwater recharge under projected climate in the upper Colorado River basin

    Science.gov (United States)

    Tillman, Fred; Gangopadhyay, Subhrendu; Pruitt, Tom

    2016-01-01

    Understanding groundwater-budget components, particularly groundwater recharge, is important to sustainably manage both groundwater and surface water supplies in the Colorado River basin now and in the future. This study quantifies projected changes in upper Colorado River basin (UCRB) groundwater recharge from recent historical (1950–2015) through future (2016–2099) time periods, using a distributed-parameter groundwater recharge model with downscaled climate data from 97 Coupled Model Intercomparison Project Phase 5 climate projections. Simulated future groundwater recharge in the UCRB is generally expected to be greater than the historical average in most decades. Increases in groundwater recharge in the UCRB are a consequence of projected increases in precipitation, offsetting reductions in recharge that would result from projected increased temperatures.

  3. Influence of the South-North Water Diversion Project and the mitigation projects on the water quality of Han River.

    Science.gov (United States)

    Zhu, Y P; Zhang, H P; Chen, L; Zhao, J F

    2008-11-15

    Situated in the central part of China, the Han River Basin is undergoing rapid social and economic development with some human interventions to be made soon which will profoundly influence the water environment of the basin. The integrated MIKE 11 model system comprising of a rainfall-runoff model (NAM), a non-point load evaluation model (LOAD), a hydrodynamic model (MIKE 11 HD) and a water quality model (ECOLab) was applied to investigate the impact of the Middle Route of the South-North Water Diversion Project on the Han River and the effectiveness of the 2 proposed mitigation projects, the 22 wastewater treatment plants (WWTPs) and the Yangtze-Han Water Diversion Project. The study concludes that business as usual will lead to a continuing rapid deterioration of the water quality of the Han River. Implementation of the Middle Route of the South-North Water Diversion Project in 2010 will bring disastrous consequence in the form of the remarkably elevated pollution level and high risk of algae bloom in the middle and lower reaches. The proposed WWTPs will merely lower the pollution level in the reach by around 10%, while the Yangtze-Han Water Diversion Project can significantly improve the water quality in the downstream 200-km reach. The results reveal that serious water quality problem will emerge in the middle reach between Xiangfan and Qianjiang in the future. Implementation of the South-North Water Diversion Project (phase II) in 2030 will further exacerbate the problem. In order to effectively improve the water quality of the Han River, it is suggested that nutrient removal processes should be adopted in the proposed WWTPs, and the pollution load from the non-point sources, especially the load from the upstream Henan Province, should be effectively controlled.

  4. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    International Nuclear Information System (INIS)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  5. Columbia River Coordinated Information System (CIS); Information Needs, 1992 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Petrosky, Charlie (Idaho Department of Fish and Game, Boise, ID); Kinney, William J. (Washington Department of Fishereis, Olympia, WA); Rowe, Mike (Shoshone-Bannock Tribes, Fort Hall, ID)

    1993-05-01

    Successful application of adaptive management to rebuilding the Columbia Basin`s anadromous fish resources requires that available information and experience be organized and shared between numerous organizations and individuals. Much of this knowledge exists only in unpublished form in agency and individual files. Even that information which is published in the form of technical and contract reports receives only limited distribution and is often out of print and unavailable after a few years. Only a small fraction of the basin`s collective knowledge is captured in permanent and readily available databases and recognized journals. State, tribal, and federal fishery managers have recognize these information management problems and have committed to a program, the Coordinated Information System Project, to capture and share more easily the core data and other information upon which management decisions are based. That project is now completing the process of scoping and identification of information needs. Construction of prototype systems will begin in 1992. This report is one in a series of seven describing the results of the Coordinated Information on System scoping and needs identification phase.

  6. Malheur River Basin cooperative bull trout/redband trout research project, annual report FY 1999; ANNUAL

    International Nuclear Information System (INIS)

    Schwabe, Lawrence; Tiley, Mark

    2000-01-01

    The purpose of this study is to document the seasonal distribution of adult/sub-adult bull trout (Salvelinus confluentus) in the Malheur River basin. Due to the decline of bull trout in the Columbia Basin, the United States Fish and Wildlife Service listed bull trout as a threatened species in June 1998. Past land management activities; construction of dams; and fish eradication projects in the North Fork and Middle Fork Malheur River by poisoning have worked in concert to cumulatively impact native species in the Malheur Basin (Bowers et. al. 1993). Survival of the remaining bull trout populations is severely threatened (Buchanan 1997). 1999 Research Objects are: (1) Document the migratory patterns of adult/sub-adult bull trout in the North Fork Malheur River; (2) Determine the seasonal bull trout use of Beulah Reservoir and bull trout entrainment; and (3) Timing and location of bull trout spawning in the North Fork Malheur River basin. The study area includes the Malheur basin from the mouth of the Malheur River located near Ontario, Oregon to the headwaters of the North Fork Malheur River (Map 1). All fish collected and most of the telemetry effort was done on the North Fork Malheur River subbasin (Map 2). Fish collection was conducted on the North Fork Malheur River at the tailwaters of Beulah Reservoir (RK 29), Beulah Reservoir (RK 29-RK 33), and in the North Fork Malheur River at Crane Crossing (RK 69) to the headwaters of the North Fork Malheur. Radio telemetry was done from the mouth of the Malheur River in Ontario, Oregon to the headwaters of the North Fork Malheur. This report will reflect all migration data collected from 3/1/99 to 12/31/99

  7. Surface-water-quality assessment of the upper Illinois River basin in Illinois, Indiana, and Wisconsin; project description

    Science.gov (United States)

    Mades, D.M.

    1987-01-01

    recent water-quality conditions and trends--is currently underway. The second activity--fixed-station water-quality sampling at eight stations--began in April 1987 and will last at least 3 years. Water-quality data collected at these stations will be used to determine the frequency of occurrence of constituent concentrations, their annual and seasonal loads, and time trends in concentrations for a selected number of constituents. The third activity will be synoptic water-quality studies. Each study will involve sampling many sites at specific flow conditions and for selected water-quality constituents. Information gained from these studies will supplement informa tion gained from fixed-station sampling. A synoptic study of streambed sediments is tentatively planned for the summer of 1987 to describe the occurrence and distribution of trace elements in the basin. The fourth activity will consist of one or more topical subbasin or river-reach studies. The purpose of such studies is to better define certain water-quality conditions in specific areas and gain an understanding of the processes affecting the observed conditions. The fifth activity is the preparation of reports that will describe results from each of the first four activities. Quality assurance and coordination are being provided at both the national and pilot-project levels. A technical quality-assurance plan that addresses all aspects of sample collection, analysis, and reporting is being prepared at the national level. This plan will be appended as needed at the pilot-project level. A National Coordinating Work Group that functions under the auspices of the Interagency Advisory Committee on Water Data and the Advisory Committee on Water Data for Public Use has been established at the national level. A local liaison committee consisting of representatives from Federal, State, and local agencies has been established to enhance communication and to ensure that the scientific information produced by the

  8. Final Technical Report of the project "Controlling Quantum Information by Quantum Correlations"

    Energy Technology Data Exchange (ETDEWEB)

    Girolami, Davide [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2018-01-17

    The report describes hypotheses, aims, methods and results of the project 20170675PRD2, “Controlling Quantum Information by Quantum Correlations”, which has been run from July 31, 2017 to January 7, 2018. The technical work has been performed by Director’s Fellow Davide Girolami of the T-4 Division, Physics of Condensed Matter and Complex Systems, under the supervision of Wojciech Zurek (T-4), Lukasz Cincio (T-4), and Marcus Daniels (CCS-7). The project ended as Davide Girolami has been converted to J. R. Oppenheimer Fellow to work on the project 20180702PRD1, “Optimal Control of Quantum Machines”, started on January 8, 2018.

  9. Comprehensive assessment of the status scientific and technical projects using Technology Project Readiness Level

    Directory of Open Access Journals (Sweden)

    A. N. Petrov

    2016-01-01

    Full Text Available The balanced methodology for assessing the Technology Project Readiness Level for commercialization (TPRL is proposed. TPRL allows to determine the dynamics and balance of development projects that use the standardized approaches used in assessing the readiness of the technology. Validation of the methodology undertaken for the projects of Federal target programs “Research and development on priority directions of development of scientific-technological complex of Russia for 2007–2013” and “Research and development on priority directions of development of scientific-technological complex of Russia for 2014–2020”. The obtained results showed the possibility of application of the methodology for the evaluation of projects, improving efficiency of expert activity in the evaluation of projects, monitoring the status of individual project and group of projects (portfolio. The application of the methodology allowed us to improve the management of individual project and portfolio of projects.Methodology TPRL will allow the implementers, industry partners, investors, and innovative industrial companies to improve the efficiency of its activities.

  10. Projects at the component development and integration facility. Quarterly technical progress report, April 1, 1994--June 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY94. The CDIF is a major Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; and Spray Casting Project

  11. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, R. Todd

    1993-04-01

    The Umatilla Basin Anadromous Fish Habitat Enhancement Project is funded under the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program Measure 704 (d) (1) 34.02 and targets the improvement of water quality and restoration of riparian areas, holding, spawning and rearing habitats of steelhead, spring and fall chinook and coho salmon. The project focused on implementing instream and riparian habitat improvements on private lands on the Umatilla Indian Reservation (hereafter referred to as Reservation) from April 1, 1988 to March 31, 1992. These efforts resulted in enhancement of the lower 1/4 mile of Boston Canyon Creek, the lower 4 river miles of Meacham Creek and 3.2 river miles of the Umatilla River (downstream of the Meacham Creek confluence upstream to the Reservation East Boundary). In 1993, the project shifted emphasis to a comprehensive watershed approach consistent with other basin efforts and began to identify upland and riparian watershed-wide causative factors impacting fisheries habitat and natural fisheries production capabilities throughout the Umatilla River Watershed. Maintenance of existing habitat improvement projects was included under this comprehensive approach. Maintenance of existing gravel traps, instream and bank stabilization structures was required within project areas during the reporting period due to spring flooding damage and high bedload movement. Maintenance activities were completed between river mile (RM) 0.0 and RM 0.25 Boston Canyon Creek, between RM 0.0 and RM 4 Meacham Creek and between RM 78.5 and RM 79 Umatilla River. Habitat enhancement areas were seeded with native grass, legume, shrub and wildflower mixes and planted with willow cuttings to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. Water quality monitoring continued for temperature and turbidity throughout the upper Umatilla River Watershed. Survey of cross sections and

  12. Settlement Yields Protection for Deerfield River from Highway Project Runoff

    Science.gov (United States)

    Both parties involved in a road and bridge construction project in Deerfield, Mass. have agreed to pay a total penalty of $21,600 to resolve claims by EPA that they violated their construction permit...

  13. Walla Walla River Basin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2005-12-01

    In 2002 and 2003, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts on private properties in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of this effort is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled nine properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and four properties on the mainstem Walla Walla River. Major accomplishments during the reporting period include the following: (1) Secured approximately $229,000 in project cost share; (2) Purchase of 46 acres on the mainstem Walla Walla River to be protected perpetually for native fish and wildlife; (3) Developed three new 15 year conservation easements with private landowners; (4) Installed 3000 feet of weed barrier tarp with new plantings within project area on the mainstem Walla Walla River; (5) Expanded easement area on Couse Creek to include an additional 0.5 miles of stream corridor and 32 acres of upland habitat; (6) Restored 12 acres on the mainstem Walla Walla River and 32 acres on Couse Creek to native perennial grasses; and (7) Installed 50,000+ new native plants/cuttings within project areas.

  14. Survey on the Technology Readiness Level of R and D projects for a Technical Risk Management

    International Nuclear Information System (INIS)

    Song, S. J.; Chang, J.; Lee, K. Y.

    2008-01-01

    The purpose of applying the Technology Readiness Level/Design Readiness Level (TRL/DRL) in technical risk management is to make technology assessments, and improve communication among researchers with a consistent, systematic technology readiness Technical risk management for the Nuclear Hydrogen Production project was adopted of experience assessed with Delphi Method from the Next Generation Nuclear Plant(NGNP)of the DOE to improve the poor contactor management of the major projects which experienced cost increases and/or schedule delays in long-term. In the current phase that is doing key technology research and development projects, the technology readiness level was reviewed and applied to the Nuclear Hydrogen Production project to prepare an input for the next design phases. Based on the previous works, pre-conceptional design and key R and D works for the Nuclear Hydrogen Design and Development(NHDD) projects and the results of key research and development projects, the TRL was applied to assess the levels and compared with the advanced design stages of Westinghouse Electric Co. With this process, several issues were identified to apply the design and technology level to the familiar steps of design process and research and development projects. In order to resolve these issues, it is needed to systematically adjust and modify the current process with TRLs

  15. Goals and activities of the JICA technical cooperation project on reduction of seismic risk in Romania

    International Nuclear Information System (INIS)

    Vacareanu, R.; Kato, H.

    2007-01-01

    Japan International Cooperation Agency (JICA) Technical Cooperation Project on Reduction of Seismic Risk for Buildings and Structures started in Romania on October 1, 2002. The aim of the Project is to strengthen the capacity of earthquake disaster related activities in Romania. The Project approval is the result of four years of intensive efforts made by professionals from Technical University of Civil Engineering Bucharest (UTCB), Ministry of Transport, Constructions and Tourism (MTCT), Romania, National Building Research Institute (INCERC) Bucharest, JICA, Building Research Institute (BRI), Tsukuba, and National Institute for Land, Infrastructure and Management (NILIM), Tsukuba, Japan. The duration of the Project is five years. The implementing agency is the National Center for Seismic Risk Reduction (NCSRR) as a public institution of national interest under MTCT. The activities are carried out by NCSRR in partnership with UTCB and INCERC. During the Project period, 29 young Romanian engineers were trained in Japan, 7 Japanese experts and 37 Japanese experts worked for long-term and short-term, respectively in Romania. Equipment for seismic instrumentation, dynamic characterization of soil and structural testing rising up approximately to 260 million yens (i.e. 2.17 million USD) were donated by JICA to Romania, through NCSRR. The total cost of the Project is roughly 7 million USD. The paper describes the main activities and results of the Project until the JICA Final Evaluation Mission (March 2007). (authors)

  16. Savannah River Plant Works Technical Department monthly progress report for May 1958: Deleted Version

    Energy Technology Data Exchange (ETDEWEB)

    1958-06-17

    This progress report by the Atomic Energy Division of the Savannah River Plant covers: Reactor Technology; Separation Technology; Engineering Assistance; Health Physics; and General Laboratory Work. (JT)

  17. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  18. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1995 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, R.Todd

    1996-05-01

    During the 1995 - 96 project period, four new habitat enhancement projects were implemented under the Umatilla River Basin Anadromous Fish Habitat Enhancement Project by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) in the upper Umatilla River Basin. A total of 38,644 feet of high tensile smooth wire fencing was constructed along 3.6 miles of riparian corridor in the Meacham Creek, Wildhorse Creek, Greasewood Creek, West Fork of Greasewood Creek and Mission Creek watersheds. Additional enhancements on Wildhorse Creek and the lower Greasewood Creek System included: (1) installation of 0.43 miles of smooth wire between river mile (RM) 10.25 and RM 10.5 Wildhorse Creek (fence posts and structures had been previously placed on this property during the 1994 - 95 project period), (2) construction of 46 sediment retention structures in stream channels and maintenance to 18 existing sediment retention structures between RM 9.5 and RM 10.25 Wildhorse Creek, and (3) revegetation of stream corridor areas and adjacent terraces with 500 pounds of native grass seed or close species equivalents and 5,000 native riparian shrub/tree species to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. U.S. Fish and Wildlife Service (USFWS), Bureau of Indian Affairs (BIA) and Environmental Protection Agency (EPA) funds were cost shared with Bonneville Power Administration (BPA) funds, provided under this project, to accomplish habitat enhancements. Water quality monitoring continued and was expanded for temperature and turbidity throughout the upper Umatilla River Watershed. Physical habitat surveys were conducted on the lower 13 river miles of Wildhorse Creek and within the Greasewood Creek Project Area to characterize habitat quality and to quantify various habitat types by area.

  19. Kikori River basin project to sustain environment alongside development

    International Nuclear Information System (INIS)

    Price, J.B.; Power, A.P.; Henry, D.

    1994-01-01

    Protecting people and the environment is an essential design and operational criteria for the Kutubu Petroleum Development Project to minimize the physical, social and economic impacts on the local people and their environment in Papua New Guinea. This paper describes how Kutubu was implemented, and how World Wildlife Fund is assisting the neighboring communities to utilize their natural resources for long term benefit. The objectives and first year expectations of a three year integrated conservation and development project are identified, and the progress is summarized

  20. Socio-Economical, Environmental Evaluation of Ken-Betwa River Link Project, India

    OpenAIRE

    Pathak Hemant

    2016-01-01

    The India's ambitious Rs 9,393 crore Ken-Betwa river interlinking project will impact very significantly on Socio-economic life of two million people of Bundelkhand region, India. Water is an important input for survival and sustenance of life. The demand of this natural gift has been increasing exponentially. This ambitious project will help us in irrigation, potable water, cheap transportation, electricity as well as a source of livelihood for our ever increasing population. In Bundelkhand ...

  1. 78 FR 48661 - Application for Presidential Permit; Soule River Hydroelectric Project: Correction

    Science.gov (United States)

    2013-08-09

    ... DEPARTMENT OF ENERGY [OE Docket No. PP-387] Application for Presidential Permit; Soule River Hydroelectric Project: Correction AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application; correction. SUMMARY: The Department of Energy (DOE) Office of Electricity Delivery...

  2. 77 FR 47058 - Middle Fork American River Hydroelectric Project Placer County Water Agency; Notice of Draft...

    Science.gov (United States)

    2012-08-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-2079-069--CA] Middle Fork American River Hydroelectric Project Placer County Water Agency; Notice of Draft Environmental Impact Statement; Public Meetings a. Date and Time of Meetings: Tuesday, August 28, 2012, from 9:00 a.m. to 11:00 a.m. and...

  3. Phase 2 Reese River Geothermal Project Slim Well 56-4 Drilling and Testing

    Energy Technology Data Exchange (ETDEWEB)

    Henkle, William R.; Ronne, Joel

    2008-06-15

    This report covers the drilling and testing of the slim well 56-4 at the Reese River Geothermal Project in Lander County, Nevada. This well was partially funded through a GRED III Cooperative Funding Agreement # DE-FC36-04GO14344, from USDOE.

  4. Protocols for Monitoring Habitat Restoration Projects in the Lower Columbia River and Estuary

    Energy Technology Data Exchange (ETDEWEB)

    Roegner, G. Curtis; Diefenderfer, Heida L.; Borde, Amy B.; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Zimmerman, Shon A.; Johnson, Gary E.

    2008-04-25

    Protocols for monitoring salmon habitat restoration projects are essential for the U.S. Army Corps of Engineers' environmental efforts in the Columbia River estuary. This manual provides state-of-the science data collection and analysis methods for landscape features, water quality, and fish species composition, among others.

  5. 76 FR 76153 - Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC...

    Science.gov (United States)

    2011-12-06

    ...] Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC, Mesquite Solar 1, LLC, Copper Crossing Solar LLC, Copper Mountain Solar 1, LLC, Pinnacle Wind, LLC, Bellevue... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG11-115-000, EG11-116-000...

  6. The Kings River Sustainable Forest Ecosystems Project: inception, objectives, and progress

    Science.gov (United States)

    Jared Verner; Mark T. Smith

    2002-01-01

    The Kings River Sustainable Forest Ecosystems Project, a formal administrative study involving extensive and intensive collaboration between Forest Service managers and researchers, is a response to changes in the agency’s orientation in favor of ecosystem approaches and to recent concern over issues associated with maintenance of late successional forest attributes...

  7. [Effect of water conservancy schistosomiasis control projects combined with molluscicide to control Oncomelania hupensis snails in rivers connecting with Yangtze River in Pukou District, Nanjing City].

    Science.gov (United States)

    Qiang, Zhou; Li-Xin, Wan; De-Rong, Hang; Qi-Hui, You; Jun, You; Yu-Lin, Zhang; Zhao-Feng, Zhu; Yi-Xin, Huang

    2017-12-07

    To evaluate the effect of the water conservancy schistosomiasis control projects combined with molluscicide to control Oncomelania hupensis snails in the rivers connecting with the Yangtze River. The water conservancy schistosomiasis control projects of Zhujiashan River, Qili River and Gaowang River were chosen as the study objects in Pukou District, Nanjing City. The data review method and field investigation were used to evaluate the effect of the water conservancy schistosomiasis control projects combined with molluscicide to control O. hupensis snails. After the projects of the water level control and concrete slope protection and mollusciciding were implemented, the snails in the project river sections were completely eliminated. The snail diffusion did not happen in the inland irrigation area too. In the outside of the river beach, though the snails still existed, the snail densities plunged below 1.0 snail per 1.0 m 2 . The comprehensive measures of the combination of water level control, concrete slope protection and mollusciciding can effectively control and eliminate the snails, and prevent the snails from spreading.

  8. An Approach to Tailoring Major Technical Reviews Based on Project Characteristics and Stakeholder Interests

    Science.gov (United States)

    Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.

    2004-01-01

    There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.

  9. South Asia river flow projections and their implications for water resources

    Science.gov (United States)

    Mathison, C.; Wiltshire, A. J.; Falloon, P.; Challinor, A. J.

    2015-06-01

    South Asia is a region with a large and rising population and a high dependance on industries sensitive to water resource such as agriculture. The climate is hugely variable with the region relying on both the Asian Summer Monsoon (ASM) and glaciers for its supply of fresh water. In recent years, changes in the ASM, fears over the rapid retreat of glaciers and the increasing demand for water resources for domestic and industrial use, have caused concern over the reliability of water resources both in the present day and future for this region. The climate of South Asia means it is one of the most irrigated agricultural regions in the world, therefore pressures on water resource affecting the availability of water for irrigation could adversely affect crop yields and therefore food production. In this paper we present the first 25 km resolution regional climate projections of river flow for the South Asia region. ERA-Interim, together with two global climate models (GCMs), which represent the present day processes, particularly the monsoon, reasonably well are downscaled using a regional climate model (RCM) for the periods; 1990-2006 for ERA-Interim and 1960-2100 for the two GCMs. The RCM river flow is routed using a river-routing model to allow analysis of present day and future river flows through comparison with river gauge observations, where available. In this analysis we compare the river flow rate for 12 gauges selected to represent the largest river basins for this region; Ganges, Indus and Brahmaputra basins and characterize the changing conditions from east to west across the Himalayan arc. Observations of precipitation and runoff in this region have large or unknown uncertainties, are short in length or are outside the simulation period, hindering model development and validation designed to improve understanding of the water cycle for this region. In the absence of robust observations for South Asia, a downscaled ERA-Interim RCM simulation provides a

  10. Savannah River Ecology Laboratory Annual Technical Progress Report of Ecological Research, June 30, 2001

    Energy Technology Data Exchange (ETDEWEB)

    Bertsch, Paul M.; Janecek, Laura; Rosier, Brenda

    2001-06-30

    The Savannah River Ecology Laboratory (SREL) is a research unit of the University of Georgia (UGA) and has been conducting ecological research on the Savannah River Site (SRS) in South Carolina for 50 years. The overall mission of the Laboratory is to acquire and communicate knowledge of ecological processes and principles. SREL conducts fundamental and applied ecological research, as well as education and outreach programs, under a Cooperative Agreement with the U.S. Department of Energy (DOE) SRS near Aiken, South Carolina. The Laboratory's research mission during the 2001 fiscal year was fulfilled with the publication of one book and 83 journal articles and book chapters by faculty, technical staff, students, and visiting scientists. An additional 77 journal articles have been submitted or are in press. Other noteworthy events took place as faculty members and graduate students received awards. These are described in the section Special Accomplishments of Faculty, Staff, Students, and Administration on page 54. Notable scientific accomplishments include work conducted on contaminant transport, global reptile decline, phytoremediation, and radioecology. Dr. Domy Adriano authored the second edition of his book ''Trace Elements in Terrestrial Environments: Biogeochemistry, Bioavailability, and Risks of Metals'', which was recently published by Springer-Verlag. The book provides a comprehensive treatment of many important aspects of trace elements in the environment. The first edition of the book, published in 1986, has become a widely acclaimed and cited reference. International attention was focused on the problem of reptile species decline with the publication of an article on this topic in the journal ''Bioscience'' in August, 2000. The article's authors included Dr. Whit Gibbons and a number of other SREL herpetologists who researched the growing worldwide problem of decline of reptile species. Factors related

  11. McArthur River project - the future of Key Lake

    International Nuclear Information System (INIS)

    Spross, J.

    1994-01-01

    The Key Lake mill has operated since the fall of 1983. The ore from both Key Lake open pits will be depleted by 1997. It is planned to use this mill, located about 60 km southwest of McArthur, to process the McArthur River ore. While the geological data collected so far on the McArthur deposit are encouraging, more information of the deposit is needed before any detailed mine planning can begin. The surface drilling program identified the orebody and provided information on the geomechanical and hydrological properties of the overlying sandstone. It was proposed to conduct an underground exploration program to further delineate the orebody. This was approved following a public hearing and review process. This program involves the sinking of a 630 metre deep shaft and the driving of one or two drifts along a portion of the orebody. From these drifts, exploration drilling every 10 m to 15 m through the orebody will provide the information required for the preparation of a feasibility study and an Environmental Impact Statement (EIS). (author). 4 refs., 8 figs

  12. Backgrounder : 1998 historic resources overview assessment, Churchill River power project

    International Nuclear Information System (INIS)

    1999-01-01

    A survey was conducted to gather information regarding the history of land-use of the Innu Nation of Labrador. The survey was made possible through research into land use and documentary sources plus the analysis of geomorphologic features and air photos. The areas of the survey included portions of the Strait of Belle Isle, Churchill Valley, proposed transmission routes of the Churchill Power Project, and survey lines at Atikonak Lake. Over 65 historical and traditional land-use sites were recorded, including two major Hudson Bay Company fur-trading posts in the Churchill Valley. This survey will be important in helping to ensure that important sites are not destroyed as a result of the proposed Churchill Power Project

  13. Browns project: an opportunity for the Finniss River

    International Nuclear Information System (INIS)

    Elvish, R.D.

    2002-01-01

    Compass Resources NL is evaluating The Brown Project that contains large undeveloped mineral resources with 82 million tonnes of identified resources containing 1.9 million tonnes of lead, 98,000 tonnes of cobalt, 614,000 tonnes of copper, along with nickel, silver and zinc. A table outlines the resources quoted in the Compass Resources' 2000 Annual Report. The project is immediately along strike from the former Rum Jungle operations. The company is committed to apply waste management strategies for acid rock drainage from day one. Alternatives being considered include encapsulate and seal, treatment and control, blend acid generating rock with acid consuming rock, and a combination of these. Indicative water balance considerations include a surplus during the wet season and a requirement for water during the dry season

  14. Tijuana River Flood Control Project, San Diego County, California.

    Science.gov (United States)

    1976-05-20

    presence of historical and archeological resoureces in the proposed project area. His letter of August 1, 1973 (see appendix) indicated that no state... human misery among those directly affected. Those impacts will be pert of the permanent and disastrous legacy of the "Recommended Plan" (Alternative Ill...of citizens; and general human misery among those directly affected. Those impacts will be part of the permanent and disastrous legacy of the

  15. Yucca Mountain Project technical status report (TSR), October 1989--March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    This Yucca Mountain Project Technical Status Report (TSR) on site characterization is the second in a series of reports that will be issued at approximately six-month intervals during site characterization. In addition, progress made toward the initiation and conduct of new site characterization activities is included. For this report, information on the technical progress made by Yucca Mountain Project participating organizations has been compiled covering the period from October 1989, through March 31, 1990. The status report consists of three sections: an introductory section; a section on the status of site characterization, which includes preparatory activities, sites programs, repository design, seals system design, waste package design, and performance assessment; and a reference section, which provides a complete listing of all published documents cited in the text. 59 refs

  16. Yucca Mountain Site Characterization Project: Technical Data Catalog (quarterly supplement), June 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The DOE/NRC Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the date, place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994

  17. Technical project of complex fast cycle heat treatment of hydrogenous coal preparation

    OpenAIRE

    Moiseev, V. A.; Andrienko, V. G.; Pileckij, V. G.; Urvancev, A. I.; Gvozdyakov, Dmitry Vasilievich; Gubin, Vladimir Evgenievich; Matveev, Aleksandr Sergeevich; Savostiyanova, Ludmila Viktorovna

    2015-01-01

    Problems of heat-treated milled hydrogenous coal preparation site creation in leading fast cycle heat treatment complex were considered. Conditions for effective use of electrostatic methods of heat-treated milled hydrogenous coal preparation were set. Technical project of heat treatment of milled hydrogenous coal preparation site was developed including coupling of working equipment complex on fast heat treatment and experimental samples of equipment being designed for manufacturing. It was ...

  18. Manhattan Project Technical Series The Chemistry of Uranium (I) Chapters 1-10

    International Nuclear Information System (INIS)

    Rabinowitch, E. I.; Katz, J. J.

    1946-01-01

    This constitutes Chapters 1 through 10. inclusive, of The Survey Volume on Uranium Chemistry prepared for the Manhattan Project Technical Series. Chapters are titled: Nuclear Properties of Uranium; Properties of the Uranium Atom; Uranium in Nature; Extraction of Uranium from Ores and Preparation of Uranium Metal; Physical Properties of Uranium Metal; Chemical Properties of Uranium Metal; Intermetallic Compounds and Alloy systems of Uranium; the Uranium-Hydrogen System; Uranium Borides, Carbides, and Silicides; Uranium Nitrides, Phosphides, Arsenides, and Antimonides.

  19. Spent Nuclear Fuel Project technical baseline document. Fiscal year 1995: Volume 1, Baseline description

    International Nuclear Information System (INIS)

    Womack, J.C.; Cramond, R.; Paedon, R.J.

    1995-01-01

    This document is a revision to WHC-SD-SNF-SD-002, and is issued to support the individual projects that make up the Spent Nuclear Fuel Project in the lower-tier functions, requirements, interfaces, and technical baseline items. It presents results of engineering analyses since Sept. 1994. The mission of the SNFP on the Hanford site is to provide safety, economic, environmentally sound management of Hanford SNF in a manner that stages it to final disposition. This particularly involves K Basin fuel, although other SNF is involved also

  20. A model technical cooperation project on the marine radioactivity assessment in the Black Sea Region

    International Nuclear Information System (INIS)

    Goektepe, B. G.; Koeksal, G.; Osvath, I.; Koese, A.; Kuecuekcezzar, R.; Varinlioglu, A.; Guengoer, E.

    2002-01-01

    Marine Environmental Assessment of the Black Sea Region is a wide scope Regional Technical Co-operation Project coded as RER/2/003 implemented by the International Atomic Energy Agency (IAEA) in the period 1995-2001.This multidisciplinay project was designed in response to the needs of participating Member States - the six Black Sea coastal countries (Bulgaria, Romania, Ukraine, Russian Federation, Georgia and Turkey)- to establish capabilities for reliably assessing radionuclides in the Black Sea environment and applying tracer techniques to marine pollution studies. The IAEA assisted laboratories in the region by providing expert services, training, equipment and materials (Goektepe et al., 1998; Osvath et al., 1997-2000)

  1. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  2. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    International Nuclear Information System (INIS)

    Saurwein, J.

    2011-01-01

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  3. Technical specification for the Quality Information Management System (QIMS) Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R.C.; Claussen, L.M.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Quality Information Management System (QIMS) Pilot Project, which has been released for VAX/VMS systems using the INGRES RDBMS. The INGRES Applications-By-Forms (ABF) software development tool was used to define the modules and screens which comprise the QIMS Pilot application. These specifications together with the QIMS information model and corresponding database definition constitute the QIMS technical specification and implementation description presented herein. The QIMS Pilot Project represents a completed software product which has been released for production use. Further extension projects are planned which will release new versions for QIMS. These versions will offer expanded and enhanced functionality to meet further customer requirements not accommodated by the QIMS Pilot Project.

  4. Hydroelectric power plant project on the Coulonge River: Report of inquiry and public hearing

    International Nuclear Information System (INIS)

    1992-01-01

    A hydroelectric power plant is proposed for the Coulonge River, a tributary of the Ottawa River in Quebec. Water would be taken from the river through a 609 m tunnel to the plant, which would contain two Francis turbines with a total installed power of 16.2 MW operating under a net head of 43 m and a water flow rate of 21.5 m 3 /s. Other works would be necessary upstream for controlling flow and protecting the intake. Total cost for the two-year construction project is estimated at $28 million and annual revenues are forecast at $6 million. An inquiry and public hearing were held to consider the biophysical, social, economic, and cultural impacts of the proposed hydroelectric project. Results of the hearing are summarized in such areas as legal aspects, environmental quality, water rights, land use, job creation, effects on tourism and recreation, effects on wildlife, water level fluctuations, water quality, and safety. The economic justification for the project is discussed with reference to electricity demand, economic viability, utilization factors, and policies that favor construction of small-scale hydroelectric plants. The project was not found to bring sufficient benefits to the region in which it was to be situated and would not be authorized unless Hydro-Quebec tariff policy with respect to small hydro plants was modified and unless the project sponsor compensates the regional municipality. 13 refs., 11 figs., 4 tabs

  5. Socio-Economical, Environmental Evaluation of Ken-Betwa River Link Project, India

    Directory of Open Access Journals (Sweden)

    Pathak Hemant

    2016-10-01

    Full Text Available The India's ambitious Rs 9,393 crore Ken-Betwa river interlinking project will impact very significantly on Socio-economic life of two million people of Bundelkhand region, India. Water is an important input for survival and sustenance of life. The demand of this natural gift has been increasing exponentially. This ambitious project will help us in irrigation, potable water, cheap transportation, electricity as well as a source of livelihood for our ever increasing population. In Bundelkhand region, there is a severe problem of lack of irrigation in one region and water logging in others. Damage to crops due to drought and pitiable drainage facility could be managed. The objectives of the paper are to study socio-economical issues and environmental challenges in Ken-Betwa River link in India and to study environmental impact of this Project.

  6. Walla Walla River Basin Fish Habitat Enhancement Project, 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed; Sexton, Amy D. (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2001-01-01

    In 2000, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. Six projects, two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River were part of the exercise. Several thousand native plants as bare-root stock and cuttings were reintroduced to the sites and 18 acres of floodplain corridor was seeded with native grass seed. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan.

  7. Cooper River Rediversion Project. Lake Moultrie and Santee River, South Carolina. Intake and Tailrace Canals.

    Science.gov (United States)

    1976-06-01

    0 COM’PLE’t 01 No N’-tcRO~TATIC. ŘLAD F.0Uv4DATlON4 PRevuRr- + L. *I. .;Appko/%C-NH 5. oo *PS f~ ;:.. .~0NlION -FULL 14’lC7, AULIC . WILAD . 7A IL W...Data 3 1 HYDROLOGY Basin Description 4 l Topography 6 2 Stream Characteristics 7 2 Climate 8 2 Precipitation 9 2 Storms of Record 10 3 Runoff and...swampy areas as they reach the Coastal Plain. Slopes of the rivers in the Coastal Plain Province average about 0.6 foot per mile. 6. Climate . The Santee

  8. Umatilla River subbasin fish habitat improvement project. Annual report 1993

    International Nuclear Information System (INIS)

    Bailey, T.D.; Laws, T.S.

    1994-05-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. Major activities undertaken during this report period included: (1) procurement of one access easement with a private landowner, (2) design, layout, and implementation of 3.36 miles of instream structure maintenance, (3) inspection and routine maintenance of 15.1 miles of fence, (4) revegetation along 3.36 miles of stream, (5) collection and summarization of physical and biological monitoring data, (6) extensive interagency coordination, and (7) environmental education activities with local high school students

  9. Technical evaluation of RETS-required reports for Crystal River Nuclear Generating Plant, Unit 3, for 1983

    International Nuclear Information System (INIS)

    Magleby, E.H.; Young, T.E.

    1985-01-01

    A review was performed on the reports required by Federal regulations and the plant-specific Radiological Effluent Technical Specifications (RETS) for operations conducted at Florida Power Corporation's Crystal River Nuclear Plant, Unit 3, during 1983. The three periodic reports reviewed were (1) the Effluent and Waste Disposal Semiannual Report, January 1-June 30, 1983, (2) the Effluent and Waste Disposal Semiannual Report, July 1-December 31, 1983, and (3) the Annual Environmental Operating Report, Radiological, 1983. The principal review guidelines were the plant's specific RETS and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  10. The Tibagi river and representations: a water controversy and development of Tibagi Project(1970 - 2000

    Directory of Open Access Journals (Sweden)

    Eliane Aparecida Biasetto

    2014-12-01

    Full Text Available The river Tibagi from the city of Londrina, in the years 1970 and 1980 was a subject of much discussion and controversy due to the project of raising its waters to supply the population of the cities of Londrina and region. In articles published in newspapers, especially in the Folha de Londrina, in the 1970s and 1980s, it was identified that, this time, the perception emerged that the river was polluted. Thus, our primary goal in the first part of this research is to investigate how it came to creating this image. Therefore, we used a collection of newspaper clippings about the controversy raised from the waters Tibagi and interviews with Nelson Amanthea civil engineer and agronomist Marcos Antonio Castanheira, both participated in discussions on the project. It was in this period that the ideas of ecology was entered and began to circulate in the city in the late 1970s. In this context, the emergence of the "age of ecology”, allegations and actions to combat pollution started to become more effective and broad, as well as, arose environmental associations, specialized government agencies and specific legislation. Thus, the objective of this research is also investigating the involvement of scientists and institutions in environmental issues through research of river Tibagi that became evident in the late 1980 and early next decade when the University State of Londrina initiated research in Tibagi river basin. Is emphasized the participation of members of the Department of Animal Biology and Plant - UEL, the company Klabin Pulp and Paper, Telêmaco Borba - PR and COPATI - Intermunicipal Consortium of Tibagi Basin, projects and actions in order to promote their recovery. A major action was investigated Project “Appearance of  Fauna and Flora River Tibagi” which became known as “Project Tibagi “. In this sense sought to investigate the origins of the project, the main participants involved, their development, search results, the

  11. Savannah River Plant, Works Technical Department monthly progress report for March 1956

    International Nuclear Information System (INIS)

    1956-01-01

    This document details activities of the Works Technical Department during the month of March 1956. It covers reactor technology, separations technology, engineering assistance and heavy water technology

  12. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Carr, D.; Hertel, B.; Jewett, M.; Janke, R.; Conner, B.

    1996-01-01

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy's (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities

  13. Changes in Projected Spatial and Seasonal Groundwater Recharge in the Upper Colorado River Basin.

    Science.gov (United States)

    Tillman, Fred D; Gangopadhyay, Subhrendu; Pruitt, Tom

    2017-07-01

    The Colorado River is an important source of water in the western United States, supplying the needs of more than 38 million people in the United States and Mexico. Groundwater discharge to streams has been shown to be a critical component of streamflow in the Upper Colorado River Basin (UCRB), particularly during low-flow periods. Understanding impacts on groundwater in the basin from projected climate change will assist water managers in the region in planning for potential changes in the river and groundwater system. A previous study on changes in basin-wide groundwater recharge in the UCRB under projected climate change found substantial increases in temperature, moderate increases in precipitation, and mostly periods of stable or slight increases in simulated groundwater recharge through 2099. This study quantifies projected spatial and seasonal changes in groundwater recharge within the UCRB from recent historical (1950 to 2015) through future (2016 to 2099) time periods, using a distributed-parameter groundwater recharge model with downscaled climate data from 97 Coupled Model Intercomparison Project Phase 5 (CMIP5) climate projections. Simulation results indicate that projected increases in basin-wide recharge of up to 15% are not distributed uniformly within the basin or throughout the year. Northernmost subregions within the UCRB are projected an increase in groundwater recharge, while recharge in other mainly southern subregions will decline. Seasonal changes in recharge also are projected within the UCRB, with decreases of 50% or more in summer months and increases of 50% or more in winter months for all subregions, and increases of 10% or more in spring months for many subregions. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  14. Hydroelectric development project of the Magpie dam on the Magpie River: Investigation and public hearing report

    International Nuclear Information System (INIS)

    Harvey, A.; Journault, C.

    2004-08-01

    Public hearings were held by Quebec's Bureau d'audiences publiques sur l'environnement (BAPE) concerning a proposed hydroelectric development project on the Magpie River in Quebec's Minganie Region. The proposed hydroelectric power plant is to be developed and managed by Hydromega Services Inc. and constructed by Aecon Group Ltd. The project consists of reconstructing a power plant and dam at an existing site that was constructed in 1961 but which has been decommissioned since 1989. The installed capacity of the proposed power plant is 40.6 MW. The drop height for the dam is 21.25 metres. The issues that were addressed during the hearings included the opinions and suggestion of the participants regarding energy provisions, regional development and ecological protection. One of the main concerns facing this project is the loss of spectacular rapids currently used by rafters. The Commission noted that the rapids cannot be saved without significant modification to the design of the project. However, the flooding associated with the project would facilitate fishermen, canoeists and kayakers, thereby preserving the recreational and tourism attributes of the Magpie River. The Commission also noted that the local economic repercussions of the project would benefit the population of the Minganie Region which has a high unemployment rate. Any ecological impacts may be controlled by relevant attenuation measures and follow-up. It was concluded that the proposed project could contribute modestly to meeting the anticipated growth in energy demand in Quebec. refs., figs

  15. Technical Analysis of Projects Being Funded by the DOE Hydrogen Program

    Energy Technology Data Exchange (ETDEWEB)

    Edward G. Skolnik

    2006-02-10

    In July 2000, Energetics began a project in which we performed site-visit based technical analyses or evaluations on hydrogen R&D projects for the purpose of providing in-depth information on the status and accomplishments of these projects to the public, and especially to hydrogen stakeholders. Over a three year period, 32 site-visit analyses were performed. In addition two concepts gleaned from the site visits became subjects of in depth techno-economic analyses. Finally, Energetics produced a compilation document that contains each site-visit analysis that we have performed, starting in 1996 on other contracts through the end of Year One of the current project (July 2001). This included 21 projects evaluated on previous contracts, and 10 additional ones from Year One. Reports on projects visited in Years One and Two were included in their respective Annual Reports. The Year Two Report also includes the two In-depth Analyses and the Compilation document. Reports in Year three began an attempt to perform reviews more geared to hydrogen safety. This Final Report contains a summary of the overall project, all of the 32 site-visit analyses and the two In-depth Analyses.

  16. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.; Roegner, G. C.; Whiting, Allan H.; Johnson, Gary E.; Dawley, Earl; Skalski, John R.; Vavrinec, John; Ebberts, Blaine D.

    2006-12-20

    This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that may play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.

  17. A light-water detritiation project at Chalk River Laboratories

    International Nuclear Information System (INIS)

    Boniface, H.A.; Castillo, I.; Everatt, A.E.; Ryland, D.K.

    2010-01-01

    The NRU reactor rod bays is a large, open pool of water that receives hundreds of fuel rods annually, each carrying a small amount of residual tritiated heavy water. The tritium concentration of the rod bays water has risen over the years, to a level that is of concern to the operations staff and to the environment. The proposed long-term solution is to reduce the rod bays tritium concentration by direct detritiation of the water. The Combined Electrolytic-Catalytic Exchange (CECE) process is well suited to the light-water detritiation problem. With a tritium-protium separation factor greater than five, a CECE detritiation process can easily achieve the eight orders of magnitude separation required to split a tritiated light-water feed into an essentially tritium-free effluent stream and a tritiated heavy water product suitable for recycling through a heavy water upgrader. This paper describes a CECE light-water detritiation process specifically designed to reduce the tritium concentration in the NRU rod bays to an acceptable level. The conceptual design of a 600 Mg/a detritiation process has been developed and is now at the stage of project review and the beginning of detailed design. (author)

  18. Development of Joint Climate and Discharge Projections for the International Rhine River Basin - the CHR RheinBlick2050 Project

    Science.gov (United States)

    Görgen, K.; Pfister, L.

    2008-12-01

    The anticipated climate change will lead to modified hydro-meteorological regimes that influence discharge behaviour and hydraulics of rivers. This has variable impacts on managed (anthropogenic) and unmanaged (natural) systems, depending on their sensitivity and vulnerability (ecology, economy, infrastructure, transport, energy production, water management, etc.). Decision makers in these contexts need adequate adaptation strategies to minimize adverse effects of climate change, i.e. an improved knowledge on the potential impacts including uncertainties means an extension of the informed options open to users. The goal of the highly applied study presented here is the development of joint, consistent climate and discharge projections for the international Rhine River catchments (Switzerland, France, Germany, Netherlands) in order to assess future changes of hydro-meteorological regimes in the meso- and macroscale Rhine River catchments and to derive and improve the understanding of such impacts on hydrologic and hydraulic processes. The RheinBlick2050 project is an international effort initiated by the International Commission for the Hydrology of the Rhine Basin (CHR) in close cooperation with the International Commission for the Protection of the Rhine. The core experiment design foresees a data-synthesis, multi-model approach where (transient) (bias- corrected) regional climate change projections are used as forcing data for existing calibrated hydrological (and hydraulic) models at a daily temporal resolution over mesoscale catchments of the Rhine River. Mainly for validation purposes, hydro-meteorological observations from national weather services are compiled into a new consistent 5 km x 5 km reference dataset from 1961 to 2005. RCM data are mainly used from the ENSEMBLES project and other existing dynamical downscaling model runs to derive probabilistic ensembles and thereby also access uncertainties on a regional scale. A benchmarking is helping to

  19. Yucca Mountain Site Characterization Project: Technical data catalog,(quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year

  20. The Environmental Trilogy project: Balancing technical, institutional, and cultural perspectives to environmental management

    International Nuclear Information System (INIS)

    Kurstedt, Pamela S.; Jim, Russell; Wadsworth, Bonnie C.W.; Burke, William H.; Kurstedt, Harold A. Jr.

    1992-01-01

    'The significant problems we face cannot be solved at the same level of thinking we were at when we created them.' Albert Einstein. I've identified an initial set of three perspectives important to building an integrated, comprehensive approach to managing the environment - technical, institutional, and cultural. I've constructed an holistic model (called the Environmental Trilogy) for environmental management, encompassing at least these three perspectives and their interrelationships. In this paper, I outline the model and report the results of a working session facilitated at Virginia Tech in Blacksburg, Virginia, in October 1991, involving three representatives from each of the technical, institutional, and cultural perspectives. The institutional members of this group were people who understand institutional effects, rather than those who represent institutions. The working group discussed and analyzed the technical-institutional, technical-cultural, and institutional-cultural inter- relationships of the environmental trilogy. The goals of the working group were to put structure on the environmental trilogy model, to facilitate the definition of variables, and explore relationships between and among variables. The working group members are to continue studying issues and components, perspectives, connections, and cause-and-effect in the models and report back to interested parties. The outcome is projected to be a more holistic, integrated view of the environment. (author)

  1. Tribal Colleges and Universities/American Indian Research and Education Initiatives Advanced Manufacturing Technical Assistance Project

    Energy Technology Data Exchange (ETDEWEB)

    Atcitty, Stanley [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-02-01

    The overall goal of this project is to establish a network of TCUs with essential advanced manufacturing (AM) facilities, associated training and education programs, and private sector and federal agency partnerships to both prepare an American Indian AM workforce and create economic and employment opportunities within Tribal communities through design, manufacturing, and marketing of high quality products. Some examples of high quality products involve next generation grid components such as mechanical energy storage, cabling for distribution of energy, and electrochemical energy storage enclosures. Sandia National Laboratories (Sandia) is tasked to provide technical advising, planning, and academic program development support for the TCU/American Indian Higher Education Consortium (AIHEC) Advanced Manufacturing Project. The TCUs include Bay Mills Community College (BMCC), Cankdeska Cikana Community College (CCCC), Navajo Technical University (NTU), Southwestern Indian Polytechnic Institute (SIPI), and Salish Kooteani College. AIHEC and Sandia, with collaboration from SIPI, will be establishing an 8-week summer institute on the SIPI campus during the summer of 2017. Up to 20 students from TCUs are anticipated to take part in the summer program. The goal of the program is to bring AM science, technology, engineering, and mathematics (STEM) awareness and opportunities for the American Indian students. Prior to the summer institute, Sandia will be providing reviews on curriculum plans at the each of the TCUs to ensure the content is consistent with current AM design and engineering practice. In addition, Sandia will provide technical assistance to each of the TCUs in regards to their current AM activities.

  2. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-10-20

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ``stabilized`` form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision.

  3. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    International Nuclear Information System (INIS)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-01-01

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ''stabilized'' form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision

  4. Independent technical review of the Sandia National Laboratories Environmental Restoration Project

    International Nuclear Information System (INIS)

    1994-11-01

    An Independent Technical Review was conducted of the Environmental Restoration Project. The objective of the review was recommendations, from a commercial perspective, on a systems level path forward to safe, minimum cost and schedule project completion. The work presented represents the consensus analysis and recommendations of thirteen individuals with varied backgrounds, expertise, and experience. The ITR team recommends that the barriers to the opportunity described in the diagnosis be eliminated using an integrated DOE-Sandia system approach. Piecemeal changes will not result in the desired commercial efficiency. DOE needs to operate as the contracting agency for a Major System Acquisition. If it does not, commercial performance will not be achieved regardless of the contractor. Likewise, Sandia needs to establish and implement the necessary project structure and management systems to operate with commercial contractor like efficiency

  5. John Day River Subbasin Fish Habitat Enhancement Project, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Powell, Russ M.; Delano, Kenneth H.; Jerome, James P.

    2002-07-01

    Work undertaken in 2001 included: (1) 3335 structure posts were pounded on six new projects thereby protecting 10 miles of stream (2) Completion of 1000 ft. of barbed wire fence and one watergap on the Middle Fork of the John Day River/ Forrest property. (3) Fence removal of 5010 ft. of barbed wire fence on the Meredith project. (4) Maintenance of all active project fences (66 miles), watergaps (76), spring developments (32) and plantings were checked and repairs performed. (5) Since the initiation of the Fish Habitat Project in 1984 we have 63.74 miles of stream protected using 106.78 miles of fence. With the addition of the Restoration and Enhancement Projects we have 180.64 miles of fence protecting 120.6 miles of stream.

  6. Audit Technical of Kori Rubber Dam in the River of Keyang District of Ponorogo East Java Province

    Science.gov (United States)

    Murnianto, E.; Suprapto, M.; Ikhsan, C.

    2018-03-01

    The development of science and technology for the utilization and protection of rivers has embodied various types of river infrastructure. Without proper maintenance, rapid river sediments undergo physical degradation and function. Problems that occur in Kori Rubber Dam, among others, the damage to the body of the rubber dam that is made of rubber, so that the function of flower deflection is not optimal. This happens because of limited operational and maintenance activities (OM). A technical audit is a process of identifying problems, analyzing, and evaluating ones conducted independently, objectively and professionally on the basis of examination, to assess the truth, accuracy, credibility, and reliability of information about a job. In this case an assessment of the Kori Rubber Dam, which is basically a benchmarking activity. Assessment of rubber dam components includes the physical conditions and functions that affect the weir. This research is expected to know the performance of Kori rubber Dam as a recommendation material in the implementation of OM Rubber Dam activities.

  7. Habitat Evaluation Procedures (HEP) Report; Sandy River Delta, Technical Report 2000-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Rocklage, Ann; Ratti, John

    2002-02-01

    requisites (e.g., food and nesting cover) for that species. These variables are evaluated with vegetation sampling, and/or through the interpretation of aerial photographs and the like. Variable values are assigned a numerical score. The score may be based on a categorical rating (e.g . , different vegetation types receive different scores based on their importance for that species) or may be the result of a linear relationship (e.g., the score increases with the variable value; Figure 1). Variable scores are then input into a mathematical formula, which results in an HSI score. The HSI score ranges from 0-1, with 0 representing poor-quality habitat and 1 optimal habitat. HSI models assume a positive, linear relationship between wildlife-species density and the HSI score. For example, with an HSI score of 1, we assume that a species will be present at its highest density. Models can be projected into the future by changing variable values and observing the corresponding changes in HSI scores. Most models are relatively simple, but some are complex. These models have come under considerable scrutiny in the last several years, particularly concerning the validity of model assumptions (Van Horne 1983, Laymon and Barrett 1986, Hobbs and Hanley 1990, Kellner et al. 1992). Regardless of criticisms, these models may be used with success when there is an understanding and acceptance of model limitations. Each model should be evaluated as to its applicability in a given situation. Model validation, where results have on-the-ground verification, is highly recommended. Specific objectives of this project were to (1) conduct avian surveys and measure the present vegetation at the Sandy River Delta, (2) input the vegetation data into HSI models for 5 avian species, (3) evaluate the current habitat suitability for these species, and (4) predict species responses to potential changes in vegetation, resulting from the removal of reed canarygrass and/or Himalayan blackberry.

  8. The international project of radiation and hydrochemical investigation and monitoring of general Caspian rivers

    International Nuclear Information System (INIS)

    Passell, H.D.; Barber, D.S.; Kadyrzhanov, K.K; Solodukhin, V.P.; Chernykh, E.E.; Arutyunyan, R.V.; Valyaev, A.N.; Kadik, A.A.; Stepanetts, O.V; Vernadsky, V.I.; Alizade, A.A.; Gutiev, I.S.; Mamedov, R.F.; Nadareishvili, K.S.; Chkhartishvili, A.G.; Tsitskishvili, M.S.; Chubaryan, E. V; Gevorgyan, R.G.; Puskyulyan, K.I.

    2005-01-01

    Full text: The scientific community of six countries (USA, Kazakhstan, Russia, Georgia, Armenia, and Azerbaijan) has developed the ecological project 'Joint International Researches and Creation of the General System of Radiation and Hydro-chemical Monitoring of Rivers of the Caspian Sea Basin.' The purpose of this project is to investigate and characterized contamination by radionuclides and toxic and chemically hazardous elements and create a valid system of radiation and hydro-chemical monitoring of the main river basins of the Caspian region: the Volga, Ural, Emba and Kura. The basins of these rivers cover large parts of Europe and Asia, including parts of Russia, West Kazakhstan and the South Caucasus and including territories of Georgia, Armenia and Azerbaijan. The total area of the basins of these rivers exceeds combined area of such large European states as France, Spain and Germany, and comprises 1631 sq. km. All these rivers are the main life-supporting water arteries for the region's inhabitants, a population that comprises tens of millions of people Also, the outlets of these rivers determine the condition of the aquatic environment of the Caspian Sea. The ecological condition of the aquatic environment of all the rivers of the Caspian Sea is to a great extent due to contamination, the main components of which are anthropogenic radioactive elements, heavy metals and oil products. At present, information about contamination levels of these rivers is not known and is occasionally contradictory. In this connection there is an obvious need of qualified investigation of contamination levels and its character in the basins of these rivers and in creating a common monitoring system to assess the quality of the aquatic environment. The present project is devoted to this matter. 1. The project provides for the following main tasks: 1. Wide-ranging investigation of the level and character of contamination by radionuclides and toxic elements of the river basins

  9. Hazardous materials in aquatic environments of the Mississippi River Basin. Annual technical report, 30 December 1992--29 December 1993

    International Nuclear Information System (INIS)

    1993-01-01

    Tulane and Xavier Universities have singled out the environment as a major strategic focus for research and training for now and beyond the year 2000. In 1989, the Tulane/Xavier Center for Bioenvironmental Research (CBR) was established as the umbrella organization which coordinates environmental research at both universities. In December, 1992, the Tulane/Xavier DBR was awarded a five year grant to study pollution in the Mississippi River system. The ''Hazardous Materials in Aquatic Environments of the Mississippi River Basin'' project is a broad research and education program aimed at elucidating the nature and magnitude of toxic materials that contaminate aquatic environments of the Mississippi River Basin. Studies include defining the complex interactions that occur during the transport of contaminants, the actual and potential impact on ecological systems and health, and the mechanisms through which these impacts might be remediated. The Mississippi River Basin represents a model system for analyzing and solving contamination problems that are found in aquatic systems world-wide. Individual papers have been processed separately for inclusion in the appropriate data bases

  10. Hazardous materials in aquatic environments of the Mississippi River Basin. Annual technical report, 30 December 1992--29 December 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    Tulane and Xavier Universities have singled out the environment as a major strategic focus for research and training for now and beyond the year 2000. In 1989, the Tulane/Xavier Center for Bioenvironmental Research (CBR) was established as the umbrella organization which coordinates environmental research at both universities. In December, 1992, the Tulane/Xavier DBR was awarded a five year grant to study pollution in the Mississippi River system. The ``Hazardous Materials in Aquatic Environments of the Mississippi River Basin`` project is a broad research and education program aimed at elucidating the nature and magnitude of toxic materials that contaminate aquatic environments of the Mississippi River Basin. Studies include defining the complex interactions that occur during the transport of contaminants, the actual and potential impact on ecological systems and health, and the mechanisms through which these impacts might be remediated. The Mississippi River Basin represents a model system for analyzing and solving contamination problems that are found in aquatic systems world-wide. Individual papers have been processed separately for inclusion in the appropriate data bases.

  11. Technical data for concentrated solar power plants in operation, under construction and in project

    Directory of Open Access Journals (Sweden)

    Ugo Pelay

    2017-08-01

    Full Text Available This article presents technical data for concentrated solar power (CSP plants in operation, under construction and in project all over the world in the form of tables. These tables provide information about plants (e.g., name of the CSP plant, country of construction, owner of the plant, aim of the plant and their technical characteristics (e.g., CSP technology, solar power, area of the plant, presence and type of hybridization system, electricity cost, presence and type of TES, power cycle fluid, heat transfer fluid, operating temperature, operating pressure, type of turbine, type and duration of storage, etc.. Further interpretation of the data and discussions on the current state-of-the-art and future trends of CSP can be found in the associated research article (Pelay et al., 2017 [1].

  12. Carmel River Lagoon Enhancement Project: Water Quality and Aquatic Wildlife Monitoring, 2006-7

    OpenAIRE

    Perry, William; Watson, Fred; Casagrande, Joel; Hanley, Charles

    2007-01-01

    This is a report to the California Department of Parks and Recreation. It describes water quality and aquatic invertebrate monitoring after the construction of the Carmel River Lagoon Enhancement Project. Included are data that have been collected for two years and preliminary assessment of the enhanced ecosystem. This report marks the completion of 3-years of monitoring water quality and aquatic habitat. The report adopts the same format and certain background text from previous ...

  13. Proposal to market Provo River Project power, Salt Lake City area

    International Nuclear Information System (INIS)

    1995-01-01

    This report is an environmental assessment of the Western Area Power Administrations's proposal to change the way in which the power produced by the Provo River Project (PRP) is marketed. The topics of the report include the alternatives to the proposed action that have been considered, a description of the environmental consequences of the proposed action and the alternatives that were considered, and other environmental considerations

  14. DECOVALEX II PROJECT. Technical report - Task 1A and 1B

    International Nuclear Information System (INIS)

    Lanru Jing; Stephansson, Ove; Kautsky, F.

    1998-08-01

    DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX I, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current state-of-the-art of rock joint research and TASK 4 - report on the coupled T-H-M issues related to repository design and performance assessment. This report is one of the technical reports of the DECOVALEX II project, describing the work performed for TASK 1A and 1B - the predictions and model calibrations for the RCF 3 pumping test at Sellafield. Presented in this report are the descriptions of the project, tasks, approaches, methods and results of numerical modelling work carried out by the research teams. The report is a summary of the research reports written by the research teams and submitted to the project secretariat, and the discussions held during project workshops and task force group meetings. The opinions and conclusions in this report, however, reflect only ideas of the authors, not necessarily a collective representation of the funding organisations of the project

  15. Minutes of Technical Division Steering Committee Meeting, September 13, 1955 -- Savannah River Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Evans, L.C.

    1955-09-16

    The Steering Committee approved 8 studies related to separation processes, analytical chemistry, waste handling, and recycle development. Safety and security issues were discussed. Appendices detail the financial status of the Technical Division and estimated man months for development studies approved for the Purex Process, tritium separations, thorium recycle, U-235 separations, and 100-, 200-, and 300-Area studies in analytical chemistry development. The status of 25 other Technical Division studies are listed along with their budget.

  16. Using Model-Based System Engineering to Provide Artifacts for NASA Project Life-Cycle and Technical Reviews Presentation

    Science.gov (United States)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    This is the presentation for the AIAA Space conference in September 2017. It highlights key information from Using Model-Based Systems Engineering to Provide Artifacts for NASA Project Life-cycle and Technical Reviews paper.

  17. Columbia River pathway report: phase I of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1991-07-01

    This report summarizes the river-pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project. The HEDR Project is estimating radiation doses that could have been received by the public from the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the river-pathway dose reconstruction effort sought to determine whether dose estimates could be calculated for populations in the area from above the Hanford Site at Priest Rapids Dam to below the site at McNary Dam from January 1964 to December 1966. Of the potential sources of radionuclides from the river, fish consumption was the most important. Doses from drinking water were lower at Pasco than at Richland and lower at Kennewick than at Pasco. The median values of preliminary dose estimates calculated by HEDR are similar to independent, previously published estimates of average doses to Richland residents. Later phases of the HEDR Project will address dose estimates for periods other than 1964--1966 and for populations downstream of McNary Dam. 17 refs., 19 figs., 1 tab.

  18. Dynamics of participation and supply of services in the Hood River Conservation Project

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.; Goeltz, R.

    1986-07-01

    The Hood River Conservation Project (HRCP) is a major residential retrofit demonstration project. HRCP is funded by the Bonneville Power Administration (BPA) and run by Pacific Power and Light Company. The project was conducted in the community of Hood River, Oregon, will cost $21 million, and will last for three years (mid-1983 through 1986). Installation of applicable retrofit measures was completed by the end of 1985; data collection, analysis, and report writing will continue through 1986. This report documents the extent to which households participated in HRCP. Differences between participants and eligible nonparticipants are examined. Similarly, differences among participants as a function of when they signed up for HRCP are analyzed. The report also examines the dynamics of program services (i.e., times between audit requests and audit, and between audit and installation of measures). These analyses are based on data from the roughly 3500 Hood River homes eligible for HRCP, 3189 of which received free home energy audits and 2988 of which received HRCP-financed retrofit measures.

  19. Hydroelectric construction project on the Sheldrake River at Riviere-au-Tonnerre : public inquiry report

    International Nuclear Information System (INIS)

    2009-09-01

    The Societe d'Energie Riviere Sheldrake Inc. has proposed the construction of a hydroelectric facility on the Sheldrake River at Riviere-au-Tonnerre in the regional municipality of Minganie in Quebec. The project involves the construction of a headrace canal, intake, tunnel, powerhouse, access roads, electrical transmission line, spillway, weir and a bridge over the Sheldrake River. The proposed development was subject to an environmental evaluation process and public consultation. Quebec's environmental public hearing board held a public hearing on the draft development of the project to hear the concerns and views of the public and stakeholders. The hearing focused on a number issues, such as reasons for the project, its location and socio-economic impacts. The cumulative environmental effects of the project were also examined. The primary concerns were the economic repercussions of the project and its effect on tourism and fish, including salmon. The Board determined that the project would create jobs in a region affected by unemployment and the decay of its municipalities and that it would stimulate the local and regional economy. However, the Board determined that changes to the project are required to minimize impacts on the natural environment. The project proponent must monitor instream flows to ensure that fish passage facilities meet regulations. In addition, since the proposed project crosses 3 bogs, the developer must compensate for lost wetlands. A 10-year follow-up is required to assess the recovery of these environments. The developer must also maintain the aesthetic quality of the Courbe du Sault Falls in order to maintain the eco-tourism in the region. refs., figs.

  20. Comprehensive report to Congress Clean Coal Technology Program. Four Rivers Energy Modernization Project

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    One of the five projects selected for funding within the Clean Coal Technology Program is a project proposed by Air Products and Chemicals, Inc. (APCI) of Allentown, Pennsylvania. APCI requested financial assistance from DOE for the design, construction, and operation of a 95 megawatt-electric (MWe) gross equivalent, second generation, pressurized, circulating fluidized bed (PCFB) combustor cogeneration facility. The project, named the Four Rivers Energy Modernization Project, is co be located adjacent to an existing APCI chemicals manufacturing facility in Calvert City, Kentucky. Four Rivers Energy Partners, L.P. (FREP), will execute the project. The demonstration plant will produce approximately 70 MWe for the utility grid and an average of 310,000 pounds per hour of process steam for the chemicals manufacturing facility. The project, including the demonstration phase, will last 80 months at a total cost of $360,707,500. DOE`s share of the project cost will be 39.5 percent, or $142,460,000. The objective of the proposed project is to demonstrate a second generation PCFB system based on technology being supplied by Foster Wheeler Energy Corporation (FWEC), Westinghouse Electric Corporation (Westinghouse), and LLB Lurgi Lentjes Babcock Energietechnik GmbH (LLB). The integrated performance to be demonstrated will involve all of the process systems, including coal preparation and feed, sorbent feed, carbonizer, char transfer, PCFB combustor, carbonizer and combustor hot-gas filtration, carbonizer and combustor alkali removal, topping combustor, gas turbine-generator, heat recovery steam generator (HRSG), steam turbine-generator, and balance-of-plant systems. The project will utilize Western Kentucky and Southern Illinois bituminous coal.

  1. Evaluation on uncertainty sources in projecting hydrological changes over the Xijiang River basin in South China

    Science.gov (United States)

    Yuan, Fei; Zhao, Chongxu; Jiang, Yong; Ren, Liliang; Shan, Hongcui; Zhang, Limin; Zhu, Yonghua; Chen, Tao; Jiang, Shanhu; Yang, Xiaoli; Shen, Hongren

    2017-11-01

    Projections of hydrological changes are associated with large uncertainties from different sources, which should be quantified for an effective implementation of water management policies adaptive to future climate change. In this study, a modeling chain framework to project future hydrological changes and the associated uncertainties in the Xijiang River basin, South China, was established. The framework consists of three emission scenarios (ESs), four climate models (CMs), four statistical downscaling (SD) methods, four hydrological modeling (HM) schemes, and four probability distributions (PDs) for extreme flow frequency analyses. Direct variance method was adopted to analyze the manner by which uncertainty sources such as ES, CM, SD, and HM affect the estimates of future evapotranspiration (ET) and streamflow, and to quantify the uncertainties of PDs in future flood and drought risk assessment. Results show that ES is one of the least important uncertainty sources in most situations. CM, in general, is the dominant uncertainty source for the projections of monthly ET and monthly streamflow during most of the annual cycle, daily streamflow below the 99.6% quantile level, and extreme low flow. SD is the most predominant uncertainty source in the projections of extreme high flow, and has a considerable percentage of uncertainty contribution in monthly streamflow projections in July-September. The effects of SD in other cases are negligible. HM is a non-ignorable uncertainty source that has the potential to produce much larger uncertainties for the projections of low flow and ET in warm and wet seasons than for the projections of high flow. PD contributes a larger percentage of uncertainty in extreme flood projections than it does in extreme low flow estimates. Despite the large uncertainties in hydrological projections, this work found that future extreme low flow would undergo a considerable reduction, and a noticeable increase in drought risk in the Xijiang

  2. 78 FR 1246 - Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the...

    Science.gov (United States)

    2013-01-08

    ...-FF08RSDC00] Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the... scoping with regard to the environmental impact statement (EIS) for the proposed Otay River Estuary... one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  3. 76 FR 70480 - Otay River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National...

    Science.gov (United States)

    2011-11-14

    ... River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National Wildlife...), intend to prepare an environmental impact statement (EIS) for the proposed Otay River Estuary Restoration... any one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  4. Quality assurance in technology development for The Clinch River Breeder Reactor Plant Project

    International Nuclear Information System (INIS)

    Anderson, J.W.

    1980-01-01

    The Clinch River Breeder Reactor Plant Project is the nation's first large-scale demonstration of the Liquid Metal Fast Breeder Reactor (LMFBR) concept. The Project has established an overall program of plans and actions to assure that the plant will perform as required. The program has been established and is being implemented in accordance with Department of Energy Standard RDT F 2-2. It is being applied to all parts of the plant, including the development of technology supporting its design and licensing activity. A discussion of the program as it is applied to development is presented

  5. Distribution of excess temperature from the Vienna Generating Station on the Nanticoke River. Technical report 90

    International Nuclear Information System (INIS)

    Carter, H.H.; Regier, R.J.

    1975-06-01

    Temperature and dye tracer data, collected in the Nanticoke River in the vicinity of the Delmarva Power and Light Company Vienna fossil-fuel power plant between 12 and 26 April 1974 were analyzed and interpreted in terms of the distribution of excess temperature as a function of tidal phase. Cooling water flows and plant recirculation were also determined. (U.S.)

  6. Savannah River Ecology Laboratory annual technical progress report of ecological research, period ending July 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Vaitkus, M.R.; Wein, G.R. [eds.; Johnson, G.

    1993-11-01

    This progress report gives an overview of research programs at the Savannah River Site. Topics include; environmental operations support, wood stork foraging and breeding, defense waste processing, environmental stresses, alterations in the environment due to pollutants, wetland ecology, biodiversity, pond drawdown studies, and environmental toxicology.

  7. Technical Status Report of the Regulatory Assistance Project: October 2001-February 2003

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This report details the work undertaken from October 2001 to February 2003 by the Regulatory Assistance Project under subcontract to the National Renewable Energy Laboratory. The objectives of this work were to develop regulatory policy options that would reduce the institutional and infrastructure barriers to full-value deployment of distributed power systems. Specific tasks included leading technical workshops on removing or overcoming regulatory barriers to distributed resources for state utility regulators and developing a draft model rule on emission performance standards for distributed generation.

  8. CSCW Challenges in Large-Scale Technical Projects - a case study

    DEFF Research Database (Denmark)

    Grønbæk, Kaj; Kyng, Morten; Mogensen, Preben Holst

    1992-01-01

    This paper investigates CSCW aspects of large-scale technical projects based on a case study of a specific Danish engineering company and uncovers s challenges to CSCW applications in this setting. The company is responsible for management and supervision of one of the worlds largest tunnel....... The initial qualitative analysis identified a number of bottlenecks in daily work, where support for cooperation is needed. Examples of bottlenecks are: sharing materials, issuing tasks, and keeping track of task status. Grounded in the analysis, cooperative design workshops based on scenarios of future work...

  9. Tribal Colleges and Universitie/American Indian Higher Education Consortium Advanced Manufacturing Technical Assistance Project

    Energy Technology Data Exchange (ETDEWEB)

    Atcitty, Stanley [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-09-01

    The National Nuclear Security Agency (NNSA) created a Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new program in early FY17 focused on Tribal Colleges and Universities (TCUs). The following report summarizes the project focus and status update during this reporting period.

  10. Status of Radon Related Activities in Member States Participating in Technical Cooperation Projects in Europe

    International Nuclear Information System (INIS)

    2017-03-01

    This publication summarizes the status of radon programmes at the start of 2014 in the Member States in Europe participating in the IAEA technical cooperation project on establishing enhanced approaches to the control of public exposure to radon. The current status was determined from responses to a questionnaire covering the following elements of a national radon action plan: policies and strategies; radon measurement surveys; establishment of reference levels; managing radon in existing buildings and in future buildings; education and training of professionals; and public awareness initiatives.

  11. Tribal Colleges and Universitie/American Indian Higher Education Consortium Advanced Manufacturing Technical Assistance Project.

    Energy Technology Data Exchange (ETDEWEB)

    Atcitty, Stanley [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-02-01

    The National Nuclear Security Agency (NNSA) created a Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new program in early FY17 focused on Tribal Colleges and Universities (TCUs). The following report summarizes the project focus and status update during this reporting period.

  12. DECOVALEX II PROJECT. Technical report - Task 2A and 2B. (Revised edition)

    International Nuclear Information System (INIS)

    Lanru Jing; Stephansson, Ove

    1998-08-01

    DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX 1, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current state-of-the-art of rock joint research and TASK 4 - report on the coupled T-H-M issues related to repository design and performance assessment. This report is one of the technical reports of the DECOVALEX II project, describing the work performed for TASK 2A and 2B - the predictions and model calibration for the hydro-mechanical effect of the excavation of the test pit for the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan. Presented in this report are the descriptions of the project, definition of Task 2, and approaches, methods and results of numerical modelling work carried out by the research teams. The report is a summary of the research reports written by the research teams and the discussions held during project workshops and task force group meetings. The opinions and conclusions in this report, however, reflect only ideas of the authors, not necessarily a collective representation of the funding organisations of the project

  13. Lake Darling Flood Control Project, Souris River, North Dakota. General Project Design.

    Science.gov (United States)

    1983-06-01

    difference between the air temperature measured at 10 feet and snow surface temperature. Td ’ - is the difference between dewpoint temperature measured at 10...to atmospheric conditions in the river reach between the outlet of the dam and the gage. f. Total dissolved solids ( TDS ) are generally considered to be...C c o o c a m m o i p - g - *tm-ett 41JI IhcaU ICI (U 4 ) flU)WwooQ- flJ ~rVlrnj M W Nfr- r- 0 r- M WMM - I# )-z .Lr n LZ n Lrr r 4r 111

  14. Productivity of Spring Chinook Salmon and Summer Steelhead in the John Day River Basin, 2008 Annual Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, Wayne H.; Schricker, Jaym' e; Ruzychi, James R. (Oregon Department of Fish and Wildlife)

    2009-02-13

    The John Day River subbasin supports one of the last remaining intact wild populations of spring Chinook salmon and summer steelhead in the Columbia River Basin. These populations remain depressed relative to historic levels and limited information is available for steelhead life history. Numerous habitat protection and rehabilitation projects have been implemented in the basin to improve salmonid freshwater production and survival. However, these projects often lack effectiveness monitoring. While our monitoring efforts outlined here will not specifically measure the effectiveness of any particular project, they will provide much needed programmatic or watershed (status and trend) information to help evaluate project-specific effectiveness monitoring efforts as well as meet some data needs as index stocks. Our continued monitoring efforts to estimate salmonid smolt abundance, age structure, SAR, smolts/redd, freshwater habitat use, and distribution of critical life states will enable managers to assess the long-term effectiveness of habitat projects and to differentiate freshwater and ocean survival. Because Columbia Basin managers have identified the John Day subbasin spring Chinook population as an index population for assessing the effects of alternative future management actions on salmon stocks in the Columbia Basin (Schaller et al. 1999) we continue our ongoing studies. This project is high priority based on the level of emphasis by the NWPPC Fish and Wildlife Program, Independent Scientific Advisory Board (ISAB), Independent Scientific Review Panel (ISRP), NOAA National Marine Fisheries Service (NMFS), and the Oregon Plan for Salmon and Watersheds (OWEB). Each of these groups have placed priority on monitoring and evaluation to provide the real-time data to guide restoration and adaptive management in the region. The objective is to estimate smolt-to-adult survival rates (SAR) and out-migrant abundance for spring Chinook Oncorhynchus tshawytscha and summer

  15. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP

  16. Linear projection of technical noise for interferometric gravitational-wave detectors

    International Nuclear Information System (INIS)

    Smith, J R; Ajith, P; Grote, H; Hewitson, M; Hild, S; Lueck, H; Strain, K A; Willke, B; Hough, J; Danzmann, K

    2006-01-01

    An international network of interferometric gravitational-wave detectors is now in operation, and has entered a period of intense commissioning focused on bringing the instruments to their theoretical sensitivity limits. To expedite this process, noise analysis techniques have been developed by the groups associated with each instrument. We present methods of noise analysis that were developed and utilized for the commissioning of the GEO 600 detector. The focal point of this paper is a technique called noise projection that is used to determine the levels of contribution of various noise sources to the detector output. Example applications of this method to control loops typical of those employed in an interferometric GW detector are presented. Possible extensions of noise projections, including technical noise subtraction and gravitational-wave vetoes are also discussed

  17. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  18. Independent technical reviews for groundwater and soil remediation projects at US Department Of Energy sites - 59188

    International Nuclear Information System (INIS)

    Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.

    2012-01-01

    The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the

  19. Promoting gender parity in basic education: Lessons from a technical cooperation project in Yemen

    Science.gov (United States)

    Yuki, Takako; Mizuno, Keiko; Ogawa, Keiichi; Mihoko, Sakai

    2013-06-01

    Many girls are not sent to school in Yemen, despite basic education being free as well as compulsory for all children aged 6-15. Aiming to improve girls' enrolment by increasing parental and community involvement, the Japan International Cooperation Agency (JICA) offered a technical cooperation project in June 2005 called Broadening Regional Initiative for Developing Girls' Education (BRIDGE). Phase 1 of this project ran for three and a half years, piloting a participatory school management model supported by school grants in six districts of the Taiz Governorate in the Southwest of Yemen. To find out how successful this approach has been in a traditional society, the authors of this paper analysed the gender parity index (GPI) of the project's pilot schools. Based on data collected at three points in time (in the initial and final years of the project, and two years after the project's end), their findings suggest that interventions in school management which strongly emphasise girls' education can be effective in improving gender parity rather quickly, regardless of the schools' initial conditions. However, the authors also observe that the pilot schools' post-project performance in terms of gender parity is mixed. While the local government allocated budgets for school grants to all pilot schools even after the project's end, training and monitoring activities were cut back. The authors further observe that the variation in performance appears to be significantly correlated with school leaders' initial perceptions of gender equality and with the number of female teachers employed. These findings point to the importance of providing schools with continuous long-term guidance and of monitoring those which implement school improvement programmes.

  20. GREAT I Study of the Upper Mississippi River. Technical Appendixes. Volume 6. Recreation.

    Science.gov (United States)

    1980-09-01

    Engineers, St. Paul District 1s. NUMBER OF PAGES * 1135 USPO & Custom House, St. Paul, MN 55101 , I4. MONITORING AGENCY NAME & ADDRESS(I different hrm ...the purpose of this proposal that the viewer would either be the highway traveler ( automobile ) or the river traveler (recreational craft). An attempt...P.S. - Parking spaces; automobile and boat trailer L.L. - Boat launching lanes B.A. - Beach area, acres * -163-- GREAT I Recreation Needs

  1. Phase II Water Rental Pilot Project: Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, Stacey H.

    1994-08-01

    The Idaho Water Rental Pilot Project was implemented in 1991 as part of the Non-Treaty Storage Fish and Wildlife Agreement between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to quantify resident fish and wildlife impacts resulting from salmon flow augmentation releases made from the upper Snake River Basin. Phase I summarized existing resource information and provided management recommendations to protect and enhance resident fish and wildlife habitat resulting from storage releases for the I improvement of an adromous fish migration. Phase II includes the following: (1) a summary of recent biological, legal, and political developments within the basin as they relate to water management issues, (2) a biological appraisal of the Snake River between American Falls Reservoir and the city of Blackfoot to examine the effects of flow fluctuation on fish and wildlife habitat, and (3) a preliminary accounting of 1993--1994 flow augmentation releases out of the upper Snake, Boise, and Payette river systems. Phase III will include the development of a model in which annual flow requests and resident fish and wildlife suitability information are interfaced with habitat time series analysis to provide an estimate of resident fish and wildlife resources.

  2. Runoff projection under climate change over Yarlung Zangbo River, Southwest China

    Science.gov (United States)

    Xuan, Weidong; Xu, Yue-Ping

    2017-04-01

    The Yarlung Zangbo River is located in southwest of China, one of the major source of "Asian water tower". The river has great hydropower potential and provides vital water resource for local and downstream agricultural production and livestock husbandry. Compared to its drainage area, gauge observation is sometimes not enough for good hydrological modeling in order to project future runoff. In this study, we employ a semi-distributed hydrologic model SWAT to simulate hydrological process of the river with rainfall observation and TRMM 3B4V7 respectively and the hydrological model performance is evaluated based on not only total runoff but snowmelt, precipitation and groundwater components. Firstly, calibration and validation of the hydrological model are executed to find behavioral parameter sets for both gauge observation and TRMM data respectively. Then, behavioral parameter sets with diverse efficiency coefficient (NS) values are selected and corresponding runoff components are analyzed. Robust parameter sets are further employed in SWAT coupled with CMIP5 GCMs to project future runoff. The final results show that precipitation is the dominating contributor nearly all year around, while snowmelt and groundwater are important in the summer and winter alternatively. Also sufficient robust parameter sets help reduce uncertainty in hydrological modeling. Finally, future possible runoff changes will have major consequences for water and flood security.

  3. The technical and economical optimization of the French geological repository project - 59275

    International Nuclear Information System (INIS)

    Raffard, Rodolphe; Labalette, Thibaud

    2012-01-01

    Document available in abstract form only. Full text of publication follows: The French Act of 28 June 2006 made the choice of reversible geological repository for long term management of high level and long-lived intermediate level waste. Andra is in charge of designing, building and operating the future industrial repository Cigeo. Current major issues consist in preparing the application to be examined in 2015, planning the construction so that operation would start in 2025 and optimizing the design on both technical and economical points of view. The Dossier 2005 -provided by Andra prior to the 2006 Act- established the feasibility of the project, especially towards compliance with safety and reversibility. Design options were presented at that time with the objective of demonstrating feasibility without ruling out possibilities of further optimization. Along with the scientific and technical review of Dossier 2005, a number of design optimization topics were identified in 2006. Working groups involved Andra's specialists as well as external experts. A particular attention was given to (i) the industrial experience of waste producers and (ii) the characteristics of the clay layer investigated in the Meuse/Haute-Marne Underground Research Laboratory. The 2006 optimization topics were prioritized taking into account their economical impact and the development plan of the project

  4. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance for Geothermal Resource Evaluation Projects

    Energy Technology Data Exchange (ETDEWEB)

    Robert P. Breckenridge; Thomas R. Wood; Joel Renner

    2010-09-01

    The purpose of this document is to report on the evaluation of geothermal resource potential on and around three different United States (U. S.) Air Force Bases (AFBs): Nellis AFB and Air Force Range (AFR) in the State of Nevada (see maps 1 and 5), Holloman AFB in the State of New Mexico (see map 2), and Mountain Home AFB in the State of Idaho (see map 3). All three sites are located in semi-arid parts of the western U. S. The U. S. Air Force, through its Air Combat Command (ACC) located at Langley AFB in the State of Virginia, asked the Federal Energy Management Program (FEMP) for technical assistance to conduct technical and feasibility evaluations for the potential to identify viable geothermal resources on or around three different AFBs. Idaho National Laboratory (INL) is supporting FEMP in providing technical assistance to a number of different Federal Agencies. For this report, the three different AFBs are considered one project because they all deal with potential geothermal resource evaluations. The three AFBs will be evaluated primarily for their opportunity to develop a geothermal resource of high enough quality grade (i.e., temperature, productivity, depth, etc.) to consider the possibility for generation of electricity through a power plant. Secondarily, if the resource for the three AFBs is found to be not sufficient enough for electricity generation, then they will be described in enough detail to allow the base energy managers to evaluate if the resource is suitable for direct heating or cooling. Site visits and meetings by INL personnel with the staff at each AFB were held in late FY-2009 and FY-2010. This report provides a technical evaluation of the opportunities and challenges for developing geothermal resources on and around the AFBs. An extensive amount of literature and geographic information was evaluated as a part of this assessment. Resource potential maps were developed for each of the AFBs.

  5. Minutes of Technical Division Steering Committee Meeting July 14, 1953, Savannah River Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Evans, L.C.

    1953-07-24

    Agreements reached on security include classification and security regulations. Safety agreements include a problem with excessive heat in the metallurgy section. Other topics discussed include Building 777, CMX, hydrisides, and separations. Appendices include information on financial status and the status of technical division studies.

  6. Technical summary of groundwater quality protection program at Savannah River Plant. Volume 1. Site geohydrology, and solid and hazardous wastes

    International Nuclear Information System (INIS)

    Christensen, E.J.; Gordon, D.E.

    1983-12-01

    The program for protecting the quality of groundwater underlying the Savannah River Plant (SRP) is described in this technical summary report. The report is divided into two volumes. Volume I contains a discussion of the general site geohydrology and of both active and inactive sites used for disposal of solid and hazardous wastes. Volume II includes a discussion of radioactive waste disposal. Most information contained in these two volumes is current as of December 1983. The groundwater quality protection program has several elements which, taken collectively, are designed to achieve three major goals. These goals are to evaluate the impact on groundwater quality as a result of SRP operations, to restore or protect groundwater quality by taking corrective action as necessary, and to ensure disposal of waste materials in accordance with regulatory guidelines

  7. FINAL TECHNICAL REPORT-THE ECOLOGY AND GENOMICS OF CO2 FIXATIION IN OCEANIC RIVER PLUMES

    Energy Technology Data Exchange (ETDEWEB)

    PAUL, JOHN H

    2013-06-21

    Oceanic river plumes represent some of the most productive environments on Earth. As major conduits for freshwater and nutrients into the coastal ocean, their impact on water column ecosystems extend for up to a thousand km into oligotrophic oceans. Upon entry into the oceans rivers are tremendous sources of CO2 and dissolved inorganic carbon (DIC). Yet owing to increased light transmissivity from sediment deposition coupled with the influx of nutrients, dramatic CO2 drawdown occurs, and plumes rapidly become sinks for CO2. Using state-of-the-art gene expression technology, we have examined the molecular biodiversity of CO2 fixation in the Mississippi River Plume (MRP; two research cruises) and the Orinoco River Plume (ORP; one cruise). When the MRP extends far into the Gulf because of entrainment with the Loop Current, MRP production (carbon fixation) can account for up to 41% of the surface production in the Gulf of Mexico. Nearer-shore plume stations (“high plume,” salinity< 32 ppt) had tremendous CO2 drawdown that was correlated to heterokont (principally diatom) carbon fixation gene expression. The principal form of nitrogen for this production based upon 15N studies was urea, believed to be from anthropogenic origin (fertilizer) from the MRP watershed. Intermediate plume environments (salinity 34 ppt) were characterized by high levels of Synechococcuus carbon fixation that was fueled by regenerated ammonium. Non-plume stations were characterized by high light Prochlorococcus carbon fixation gene expression that was positively correlated with dissolved CO2 concentrations. Although data from the ORP cruise is still being analyzed, some similarities and striking differences were found between the ORP and MRP. High levels of heterokont carbon fixation gene expression that correlated with CO2 drawdown were observed in the high plume, yet the magnitude of this phenomenon was far below that of the MRP, most likely due to the lower levels of anthropogenic

  8. "Projeto Rios" (Rivers Project) a methodology of classroom of the future (northern Portugal)

    Science.gov (United States)

    Almeida, Ana

    2013-04-01

    The rivers and the surrounding land drained by them are very important wildlife habitats. The water itself provides the environment for plants and animals, while the banks and nearby land support creatures such as otters, water lizards, dragonflies and a variety of water-loving plants. Using a different teaching strategy, on the latest three years, students of the eighth grade of the EB 2.3 Agrela school have been implementing the project "Nós e o Leça" (We and the river Leça). This initiative is part of a nationwide project in Portugal, the "Projeto Rios", which is a tool that aims the adoption and monitoring of a 500 meter river section, promoting society's awareness for the problems and the need of protection and recovery of the riparian systems. These students adopted a section of the Leça River, which is the one that is passing nearby our school. Throughout the mentioned school years, the children made field trips for characterization, knowledge and observation of some happenings on the section adopted, with the aid of a complete kit of materials (galoshes, loupes, tweezers, trays, fishnets, tape measure, tape of pH...). Token fields for identifications of plants and animals and specific data sheets/questionnaires, were also used and fulfilled. While in the river, it is done the collection of macro invertebrates to conclude about the water quality of the section under study. Youth also detect disturbances in the balance of the riverine ecosystem, either naturally occurring or of human origin. Aiming the sustained development and the citizenship education, the students performed a final action for improvement, which consisted in the uprooting of an invasive plant, in this case "the herb-of-fortune" and also gathering the "trash" founded along the adopted stretch of the river. Back to the classroom, we selected photographs and the collected data is treated and discussed to produce information (summaries, reports, tables, charts,...) which will be published

  9. Teaching Power Electronics with a Design-Oriented, Project-Based Learning Method at the Technical University of Denmark

    Science.gov (United States)

    Zhang, Zhe; Hansen, Claus Thorp; Andersen, Michael A. E.

    2016-01-01

    Power electronics is a fast-developing technology within the electrical engineering field. This paper presents the results and experiences gained from applying design-oriented project-based learning to switch-mode power supply design in a power electronics course at the Technical University of Denmark (DTU). Project-based learning (PBL) is known…

  10. Environmental Assessment for Lignite Fuel Enhancement Project, Coal Creek Station, Great River Energy, Underwood, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-01-16

    The US Department of Energy (DOE) has prepared this EA to assess the environmental impacts of the commercial application of lignite fuel enhancement. The proposed demonstration project would be implemented at Great River Energy's Coal Creek Station near Underwood, North Dakota. The proposed project would demonstrate a technology to increase the heating value of lignite and other high-moisture coals by reducing the moisture in the fuels. Waste heat that would normally be sent to the cooling towers would be used to drive off a percentage of the moisture contained within the lignite. Application of this technology would be expected to boost power-generating efficiencies, provide economic cost savings for lignite and sub-bituminous power plants, and reduce air emissions. The proposed project would be constructed on a previously disturbed site within the Coal Creek Station and no negative impacts would occur in any environmental resource area.

  11. Umatilla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Loffink, Ken; Duke, Bill

    2008-12-31

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from June 7, 2007 to August 11, 2008. A total of 3,133 summer steelhead (Oncorhynchus mykiss); 1,487 adult, 1,067 jack, and 999 subjack fall Chinook (O. tshawytscha); 5,140 adult and 150 jack coho (O. kisutch); and 2,009 adult, 517 jack, and 128 subjack spring Chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 1,442 summer steelhead and 88 adult and 84 jack spring Chinook were hauled upstream from Threemile Dam. There were 1,497 summer steelhead; 609 adult, 1,018 jack and 979 subjack fall Chinook; 5,036 adult and 144 jack coho; and 1,117 adult, 386 jack and 125 subjack spring Chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 110 summer steelhead; 878 adult and 43 jack fall Chinook; and 560 adult and 28 jack spring Chinook were collected as broodstock for the Umatilla River hatchery program. In addition, there were 241 adult and 15 jack spring Chinook collected at Threemile Dam for outplanting in the South Fork Walla Walla River and Mill Cr, a tributary of the mainstem Walla Walla River. The Westland Canal juvenile facility (Westland), located near the town of Echo at river mile (RM) 27, is the major collection point for out-migrating juvenile salmonids and steelhead kelts. The canal was open for 158 days between February 11, 2008 and July 18, 2008. During that period, fish were bypassed back to the river 150 days and were trapped 6 days. There were also 2 days when fish were directed into and held in the canal forebay between the time the bypass was closed and the trap opened. An estimated 64 pounds of fish were transported from the Westland trapping facility. Approximately 25.8% of the fish transported were salmonids. In addition, one

  12. Estuarine Landcover Along the Lower Columbia River Estuary Determined from Compact Ariborne Spectrographic Imager (CASI) Imagery, Technical Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Garono, Ralph; Robinson, Rob

    2003-10-01

    Developing an understanding of the distribution and changes in estuarine and riparian habitats is critical to the management of biological resources in the lower Columbia River. In a recently completed comprehensive ecosystem protection and enhancement plan for the lower Columbia River Estuary (CRE), Jerrick (1999) identified habitat loss and modification as one of the key threats to the integrity of the CRE ecosystem. This management plan called for an inventory of habitats as key first step in the CRE long-term restoration effort. While previous studies have produced useful data sets depicting habitat cover types along portions of the lower CRE (Thomas, 1980; Thomas, 1983; Graves et al., 1995; NOAA, 1997; Allen, 1999), no single study has produced a description of the habitats for the entire CRE. Moreover, the previous studies differed in data sources and methodologies making it difficult to merge data or to make temporal comparisons. Therefore, the Lower Columbia River Estuary Partnership (Estuary Partnership) initiated a habitat cover mapping project in 2000. The goal of this project was to produce a data set depicting the current habitat cover types along the lower Columbia River, from its mouth to the Bonneville Dam, a distance of {approx}230-km (Fig. 1) using both established and emerging remote sensing techniques. For this project, we acquired two types of imagery, Landsat 7 ETM+ and Compact Airborne Spectrographic Imager (CASI). Landsat and CASI imagery differ in spatial and spectral resolution: the Landsat 7 ETM+ sensor collects reflectance data in seven spectral bands with a spatial resolution of 30-m and the CASI sensor collects reflectance data in 19 bands (in our study) with a spatial resolution of 1.5-m. We classified both sets of imagery and produced a spatially linked, hierarchical habitat data set for the entire CRE and its floodplain. Landsat 7 ETM+ classification results are presented in a separate report (Garono et al., 2003). This report

  13. Model Watershed Plan; Lemhi, Pahsimeroi, and East Fork of the Salmon River Management Plan, 1995 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Swift, Ralph

    1995-11-01

    Idaho`s Model Watershed Project was established as part of the Northwest Power Planning Council`s plan for salmon recovery in the Columbia River Basin. The Council`s charge was simply stated and came without strings. The tasks were to identify actions within the watershed that are planned or needed for salmon habitat, and establish a procedure for implementing habitat-improvement measures. The Council gave the responsibility of developing this project to the Idaho Soil Conservation Commission. This Model Watershed Plan is intended to be a dynamic plan that helps address these two tasks. It is not intended to be the final say on either. It is also not meant to establish laws, policies, or regulations for the agencies, groups, or individuals who participated in the plan development.

  14. Minutes of Technical Division Steering Committee meeting January 11, 1955, Savannah River Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Evans, L.C.

    1955-01-18

    The following studies were approved: 8501 - non-destructive testing, 8502 - 300 Area process development, 8503 - new fuel element fabrication, 8504 - protective coatings for new fuel elements, 8505 - corrosion, 8508 - instrument development in 300 Area, 8514 - instrument development in 100 Area, 8515 - instrument development in 200 Area, and 8524 - new LM elements. Information and Safety agreements are listed, and information in appended on the following topics: financial status, instrument development program, metallurgical development program, and Technical Division study status.

  15. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer winter and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.

  16. Habitat Evaluation Procedures (HEP) Report; Big Island - The McKenzie River, Technical Report 1998-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Sieglitz, Greg

    2001-03-01

    The Big Island site is located in the McKenzie River flood plain, containing remnant habitats of what was once more common in this area. A diverse array of flora and fauna, representing significant wildlife habitats, is present on the site. Stands of undisturbed forested wetlands, along with riparian shrub habitats and numerous streams and ponds, support a diversity of wildlife species, including neotropical migratory songbirds, raptors, mammals, reptiles, and amphibians (including two State-listed Sensitive Critical species). The project is located in eastern Springfield, Oregon (Figure 1). The project area encompasses 187 acres under several ownerships in Section 27 of Township 17S, Range 2W. Despite some invasion of non-native species, the site contains large areas of relatively undisturbed wildlife habitat. Over several site visits, a variety of wildlife and signs of wildlife were observed, including an active great blue heron rookery, red-Legged frog egg masses, signs of beaver, and a bald eagle, Wildlife habitat values resulting from the purchase of this site will contribute toward the goal of mitigating for habitat lost as outlined in the Bonneville Power Administration's (BPA) Mitigation and Enhancement Plan for the Willamette River Basin. Under this Plan, mitigation goals and objectives were developed as a result of the loss of wildlife habitat due to the construction of Federal hydroelectric facilities in the Willamette River Basin. Results of the Habitat Evaluation Procedures (HEP) will be used to: (1) determine the current habitat status of the study area and habitat enhancement potential of the site consistent with wildlife mitigation goals and objectives; and (2) develop a management plan for the area.

  17. First Results from HOTSPOT: The Snake River Plain Scientific Drilling Project, Idaho, U.S.A.

    Directory of Open Access Journals (Sweden)

    John W. Shervais

    2013-03-01

    Full Text Available HOTSPOT is an international collaborative effort to understand the volcanic history of the Snake River Plain (SRP. The SRP overlies a thermal anomaly, the Yellowstone-Snake River hotspot, that is thought to represent a deep-seated mantle plume under North America. Theprimary goal of this project is to document the volcanic and stratigraphic history of the SRP, which represents the surface expression of this hotspot, and to understand how it affected the evolution of continental crust and mantle. An additional goal is to evaluate the geothermal potential of southern Idaho.Project HOTSPOT has completed three drill holes. (1 The Kimama site is located along the central volcanic axis of the SRP; our goal here was to sample a long-term record of basaltic volcanism in the wake of the SRP hotspot. (2 The Kimberly site is located near the margin of the plain; our goal here was to sample a record of high-temperaturerhyolite volcanism associated with the underlying plume. This site was chosen to form a nominally continuous record of volcanism when paired with the Kimama site. (3 The Mountain Home site is located in the western plain; our goal here was to sample the Pliocene-Pleistocene transition in lake sediments at this site and to sample older basalts that underlie the sediments.We report here on our initial results for each site, and on some of the geophysical logging studies carried out as part of this project.

  18. Walla Walla River Basin Fish Habitat Enhancement Project, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed; Sexton, Amy D. (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2003-04-01

    In 2001, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled six properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River. Since 1997, approximately 7 miles of critical salmonid habitat has been secured for restoration and protection under this project. Major accomplishments to date include the following: Secured approximately $250,000 in cost share; Secured 7 easements; Planted 30,000+ native plants; Installed 50,000+ cuttings; and Seeded 18 acres to native grass. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan. Basin-wide monitoring also included the deployment of 6 thermographs to collect summer stream temperatures.

  19. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2009

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Bryson, Amanda J.; Cameron, April; Coleman, Andre M.; Corbett, C.; Dawley, Earl M.; Ebberts, Blaine D.; Kauffman, Ronald; Roegner, G. Curtis; Russell, Micah T.; Silva, April; Skalski, John R.; Thom, Ronald M.; Vavrinec, John; Woodruff, Dana L.; Zimmerman, Shon A.

    2010-10-26

    This is the sixth annual report of a seven-year project (2004 through 2010) to evaluate the cumulative effects of habitat restoration actions in the lower Columbia River and estuary (LCRE). The project, called the Cumulative Effects Study, is being conducted for the U.S. Army Corps of Engineers Portland District (USACE) by the Marine Sciences Laboratory of the Pacific Northwest National Laboratory (PNNL), the Pt. Adams Biological Field Station of the National Marine Fisheries Service (NMFS), the Columbia River Estuary Study Taskforce (CREST), and the University of Washington. The goal of the Cumulative Effects Study is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the 235-km-long LCRE. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. From 2005 through 2009, annual field research involved intensive, comparative studies paired by habitat type (tidal swamp versus marsh), trajectory (restoration versus reference site), and restoration action (tidegate replacement vs. culvert replacement vs. dike breach).

  20. U.S. Geological Survey and Bureau of Land Management Cooperative Coalbed Methane Project in the Powder River Basin, Wyoming

    Science.gov (United States)

    ,

    2006-01-01

    Introduction: Evidence that earthquakes threaten the Mississippi, Ohio, and Wabash River valleys of the Central United States abounds. In fact, several of the largest historical earthquakes to strike the continental United States occurred in the winter of 1811-1812 along the New Madrid seismic zone, which stretches from just west of Memphis, Tenn., into southern Illinois (fig. 1). Several times in the past century, moderate earthquakes have been widely felt in the Wabash Valley seismic zone along the southern border of Illinois and Indiana (fig. 1). Throughout the region, between 150 and 200 earthquakes are recorded annually by a network of monitoring instruments, although most are too small to be felt by people. Geologic evidence for prehistoric earthquakes throughout the region has been mounting since the late 1970s. But how significant is the threat? How likely are large earthquakes and, more importantly, what is the chance that the shaking they cause will be damaging?The Bureau of Land Management (BLM) Wyoming Reservoir Management Group and the U.S. Geological Survey (USGS) began a cooperative project in 1999 to collect technical and analytical data on coalbed methane (CBM) resources and quality of the water produced from coalbeds in the Wyoming part of the Powder River Basin. The agencies have complementary but divergent goals and these kinds of data are essential to accomplish their respective resource evaluation and management tasks. The project also addresses the general public need for information pertaining to Powder River Basin CBM resources and development. BLM needs, which relate primarily to the management of CBM resources, include improved gas content and gas in-place estimates for reservoir characterization and resource/reserve assessment, evaluation, and utilization. USGS goals include a basinwide assessment of CBM resources, an improved understanding of the nature and origin of coalbed gases and formation waters, and the development of predictive

  1. Technical assessment of the bedrock waste storage at the Savannah River Plant

    International Nuclear Information System (INIS)

    Bradley, R.F.; Corey, J.C.

    1976-11-01

    An assessment of the safety and feasibility of ultimate storage of radioactive wastes produced at the Savannah River Plant (SRP) in horizontal tunnels excavated in the bedrock beneath the plant site is presented. Results indicate that a cavern with an excavated volume of 130 million gallons could contain 80 million gallons of concentrated radioactive SRP wastes with minimal risks if the cavern is located in the impermeable Triassic Basin underlying the Savannah River site. The cavern could be placed so that it would lie wholly within the boundaries of the plantsite. The document summarizes the general geological, hydrological, and chemical knowledge of the geological structures beneath the plantsite; develops evaluation guidelines; and utilizes mathematical models to conduct risk analyses. The risk models are developed from known soil and salt solution mechanics; from past, present, and future geological behavior of the onsite rock formations; and from known waste handling technology. The greatest risk is assessed to exist during transfer of the radioactive wastes to the cavern. When the cavern is filled and sealed, further population risks are asessed to be very low

  2. The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project

    International Nuclear Information System (INIS)

    Brock Presgrove, S.

    1992-01-01

    The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste currently stored at the DOE Savannah River Site Tank Farm. Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on the project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review: Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator; The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. (author)

  3. Substantiation of the safety in the technical project of Belene NPP

    International Nuclear Information System (INIS)

    Boyadzhiev, A.

    1990-01-01

    The chapter contains an evaluation of the safety of Belene NPP project, based on an experts study of the corresponding volume of the Technical Project documentation of the main contractor and also on other related documents. The authors state that most of the remarks are constitutive, part of them requiring additional information or research. The general explicit conclusion is that the materials on the safety substantiation provided in the project are insufficient for making final statements on the safety of the NPP and there is a need for a detailed analysis and expertise. There are 12 topical conclusion paragraphs and each of them comprises a number of remarks. Among the remarks there are some related to the reactivity coefficient values in certain modes of operation, the problem of the mechanical safety and control system efficiency, the unacceptable operation at nominal power in case of stringent safety rules enforcement, the insufficiency of the PSA, the automatic control systems and the software codes not standing up to the contemporary requirements. (R.Ts.)

  4. Technical realization of the VISA-2 Project, contract: 2.01/ I phase, Volume No. I

    International Nuclear Information System (INIS)

    1963-12-01

    Cooperation between the Institutes in Vinca and Saclay has started by carrying out the task 'Technical realization of the VISA-2 project' which should enable: obtaining new experimental spaces in the RA reactor with high fast neutron flux for sample irradiation; obtaining experience in reactor continual operation for few months at nominal power of 6.5 MW and increase of RA reactor utilization; solving the problem of activated channels and samples transport, problems of working in hot cells; obtaining irradiated samples for examining radiation effects first in Saclay and later in Vinca. The project is divided in three phases. Phase one covers the reconstruction of the RA reactor fuel channels according to the VISA-2 project demands. The second phase includes the activities related to measuring devices for measuring the temperatures at the incoming and outgoing heavy water in 5 VISA-2 channels, as well as temperature of the samples (55 thermocouples) and testing the channels and capsules after their insertion in the reactor. The third phase includes activities are related to problems of transport of radioactive channels and VISA-2 capsules, problems of cutting as well as packing and transporting of irradiated samples from Vinca to Saclay. This volume includes all the relevant documents for completing the task including contracts, needed preliminary calculations as well as safety analysis [sr

  5. Science Roles and Interactions in Adaptive Management of Large River Restoration Projects, Midwest United States

    Science.gov (United States)

    Jacobson, R. B.; Galat, D. L.; Smith, C. B.

    2010-12-01

    Most large-river restoration projects include formal or informal implementations of adaptive management strategies which acknowledge uncertainty and use scientific inquiry to learn and refine management options. Although the central role of science in reducing uncertainty is acknowledged in such projects, specific roles and interactions can vary widely, including how science relates to decision-making within the governance of these projects. Our objective is to present some structured generalizations about science roles and interactions as developed from the authors’ experiences in adaptive management of large river restoration in the Midwest United States. Scientific information may be introduced into decision making by scientists acting in any of the three roles common to adaptive management -- action agency representative, stakeholder, or science provider. We have observed that confusion and gridlock can arise when it is unclear if a scientist is acting as an advocate for a stakeholder or management position, or instead as an independent, “honest broker” of science. Although both advocacy and independence are proper and expected in public decision making, it is useful when scientists unambiguously identify their role. While complete scientific independence may be illusory, transparency and peer review can promote the ideal. Transparency comes from setting clear directions and objectives at the decision-making level and defining at the outset how learning will help assess progress and inform decisions. Independent peer reviews of proposals, study plans, and publications serve as a powerful tool to advance scientific independence, even if funding sources present a potential conflict of interest. Selection of experts for scientific advice and review often requires consideration of the balance between benefits of the “outside” expert (independent, knowledgeable but with little specific understanding of the river system), compared to those provided by the

  6. Modeling the Projected Changes of River Flow in Central Vietnam under Different Climate Change Scenarios

    Directory of Open Access Journals (Sweden)

    Tuan B. Le

    2015-07-01

    Full Text Available Recent studies by the United Nations Environment Programme (UNEP and the Intergovernmental Panel on Climate Change (IPCC indicate that Vietnam is one of the countries most affected by climate change. The variability of climate in this region, characterized by large fluctuations in precipitation and temperature, has caused significant changes in surface water resources. This study aims to project the impact of climate change on the seasonal availability of surface water of the Huong River in Central Vietnam in the twenty-first century through hydrologic simulations driven by climate model projections. To calibrate and validate the hydrologic model, the model was forced by the rain gage-based gridded Asian Precipitation–Highly Resolved Observational Data Integration Towards Evaluation of water resources (APHRODITE V1003R1 Monsoon Asia precipitation data along with observed temperature, humidity, wind speed, and solar radiation data from local weather stations. The simulated discharge was compared to observations for the period from 1951 until present. Three Global Climate Models (GCMs ECHAM5-OM, HadCM3 and GFDL-CM2.1 integrated into Long Ashton Research Station-Weather Generator (LARS-WG stochastic weather generator were run for three IPCC–Special Report on Emissions Scenarios (IPCC-SRES emissions scenarios A1B, A2, and B1 to simulate future climate conditions. The hydrologic model simulated the Huong River discharge for each IPCC-SRES scenario. Simulation results under the three GCMs generally indicate an increase in summer and fall river discharge during the twenty-first century in A2 and B1 scenarios. For A1B scenario, HadCM3 and GFDL-CM2.1 models project a decrease in river discharge from present to the 2051–2080 period and then increase until the 2071–2100 period while ECHAM5-OM model produces opposite projection that discharge will increase until the 2051–2080 period and then decrease for the rest of the century. Water management

  7. Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.

  8. Pre-shipment preparations at the Savannah River Site - WSRC's technical basis to support DOE's approval to ship

    International Nuclear Information System (INIS)

    Thomas, Jay E.; Bickley, Donald W.; Conatser, E. Ray

    2000-01-01

    Store', to provide a disciplined method for ensuring that all of the pre-shipment receipt preparations have been completed. This paper will provide a detailed description of each of the pre-shipment process steps WSRC performs to produce the technical basis for approving the receipt and storage of spent nuclear fuel at the Savannah River Site. It is intended to be a guide to reactor operators who plan on returning 'U.S. origin' SNF and to emphasize the need for accurate and timely completion of pre-shipment activities. (author)

  9. River Diversions and Shoaling

    National Research Council Canada - National Science Library

    Letter, Jr., Joseph V; Pinkard, Jr., C. F; Raphelt, Nolan K

    2008-01-01

    This Coastal and Hydraulics Engineering Technical Note describes the current knowledge of the potential impacts of river diversions on channel morphology, especially induced sedimentation in the river channel...

  10. South Fork Snake River/Palisades Wildlife Mitigation Project: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    BPA proposes to fund the implementation of the South Fork Snake River Programmatic Management Plan to compensate for losses of wildlife and wildlife habitat due to hydroelectric development at Palisades Dam. The Idaho Department of Fish and Game drafted the plan, which was completed in May 1993. This plan recommends land and conservation easement acquisition and wildlife habitat enhancement measures. These measures would be implemented on selected lands along the South Fork of the Snake River between Palisades Dam and the confluence with the Henry`s Fork, and on portions of the Henry`s Fork located in Bonneville, Madison, and Jefferson Counties, Idaho. BPA has prepared an Environmental Assessment evaluating the proposed project. The EA also incorporates by reference the analyses in the South Fork Snake River Activity/Operations Plan and EA prepared jointly in 1991 by the Bureau of Land Management and the Forest Service. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  11. Phase I of the Kissimmee River restoration project, Florida, USA: impacts of construction on water quality.

    Science.gov (United States)

    Colangelo, David J; Jones, Bradley L

    2005-03-01

    Phase I of the Kissimmee River restoration project included backfilling of 12 km of canal and restoring flow through 24 km of continuous river channel. We quantified the effects of construction activities on four water quality parameters (turbidity, total phosphorus flow-weighted concentration, total phosphorus load and dissolved oxygen concentration). Data were collected at stations upstream and downstream of the construction and at four stations within the construction zone to determine if canal backfilling and construction of 2.4 km of new river channel would negatively impact local and downstream water quality. Turbidity levels at the downstream station were elevated for approximately 2 weeks during the one and a half year construction period, but never exceeded the Florida Department of Environmental Protection construction permit criteria. Turbidity levels at stations within the construction zone were high at certain times. Flow-weighted concentration of total phosphorus at the downstream station was slightly higher than the upstream station during construction, but low discharge limited downstream transport of phosphorus. Total phosphorus loads at the upstream and downstream stations were similar and loading to Lake Okeechobee was not significantly affected by construction. Mean water column dissolved oxygen concentrations at all sampling stations were similar during construction.

  12. Aviation Trends Related to Atmospheric Environment Safety Technologies Project Technical Challenges

    Science.gov (United States)

    Reveley, Mary S.; Withrow, Colleen A.; Barr, Lawrence C.; Evans, Joni K.; Leone, Karen M.; Jones, Sharon M.

    2014-01-01

    Current and future aviation safety trends related to the National Aeronautics and Space Administration's Atmospheric Environment Safety Technologies Project's three technical challenges (engine icing characterization and simulation capability; airframe icing simulation and engineering tool capability; and atmospheric hazard sensing and mitigation technology capability) were assessed by examining the National Transportation Safety Board (NTSB) accident database (1989 to 2008), incidents from the Federal Aviation Administration (FAA) accident/incident database (1989 to 2006), and literature from various industry and government sources. The accident and incident data were examined for events involving fixed-wing airplanes operating under Federal Aviation Regulation (FAR) Parts 121, 135, and 91 for atmospheric conditions related to airframe icing, ice-crystal engine icing, turbulence, clear air turbulence, wake vortex, lightning, and low visibility (fog, low ceiling, clouds, precipitation, and low lighting). Five future aviation safety risk areas associated with the three AEST technical challenges were identified after an exhaustive survey of a variety of sources and include: approach and landing accident reduction, icing/ice detection, loss of control in flight, super density operations, and runway safety.

  13. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    International Nuclear Information System (INIS)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations

  14. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  15. Technical needs and research opportunities provided by projected aeronautical and space systems

    Science.gov (United States)

    Noor, Ahmed K.

    1992-01-01

    The overall goal of the present task is to identify the enabling and supporting technologies for projected aeronautical and space systems. A detailed examination was made of the technical needs in the structures, dynamics and materials areas required for the realization of these systems. Also, the level of integration required with other disciplines was identified. The aeronautical systems considered cover the broad spectrum of rotorcraft; subsonic, supersonic and hypersonic aircraft; extremely high-altitude aircraft; and transatmospheric vehicles. The space systems considered include space transportation systems; spacecrafts for near-earth observation; spacecrafts for planetary and solar exploration; and large space systems. A monograph is being compiled which summarizes the results of this study. The different chapters of the monograph are being written by leading experts from governmental laboratories, industry and universities.

  16. LLNL/YMP Waste Container Fabrication and Closure Project; GFY technical activity summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-10-01

    The Department of Energy`s Office of Civilian Radioactive Waste Management (OCRWM) Program is studying Yucca Mountain, Nevada as a suitable site for the first US high-level nuclear waste repository. Lawrence Livermore National Laboratory (LLNL) has the responsibility for designing and developing the waste package for the permanent storage of high-level nuclear waste. This report is a summary of the technical activities for the LLNL/YMP Nuclear Waste Disposal Container Fabrication and Closure Development Project. Candidate welding closure processes were identified in the Phase 1 report. This report discusses Phase 2. Phase 2 of this effort involved laboratory studies to determine the optimum fabrication and closure processes. Because of budget limitations, LLNL narrowed the materials for evaluation in Phase 2 from the original six to four: Alloy 825, CDA 715, CDA 102 (or CDA 122) and CDA 952. Phase 2 studies focused on evaluation of candidate material in conjunction with fabrication and closure processes.

  17. Trace of the 'Fugen' project. Its technical development results to be succeeded

    International Nuclear Information System (INIS)

    Ishikure, Kenkichi; Kikuchi, Saburo; Kobayashi, Hiromasa; Hino, Minoru

    2003-01-01

    A prototype reactor of the advanced thermal reactor (ATR), 'Fugen' will be finished its operation on March, 2003. And, the 'Fugen' project advanced by self technology development has largely contributed to nuclear energy development in Japan at various fields. Nuclear energy is now laid at change of its environment without previous experiences, such as relaxation of regulation, liberalization of electric powers, cost down, and so on. A history on challenge of self technology development must be valuable experiences essential for present and future nuclear energy. To succeed results with and without shapes obtained by the 'Fugen', to generation sharing coming future, here were investigated verifications on its technical results and self technology development results and how their results are activated to future. (G.K.)

  18. Upper Caraş River (Danube watershed fish populations fragmentation – technical rehabilitation proposal

    Directory of Open Access Journals (Sweden)

    Voicu Răzvan

    2018-01-01

    Full Text Available We propose a technical solution for fish movement based on the flow of water over a spill threshold. Such barriers are common in the Danube system. The proposed system has a range of operating components which are easily detachable from the spill threshold, are resistant to corrosion and will not harm the fish. In fact, if designed to complement swimming abilities of target fish, it should provide adequate passage for both adults and juveniles. If implemented correctly, the design may offer a solution to help displaced fish recolonize upstream habitats.

  19. Savannah River Plant low-level waste incinerator: Operational results and technical development

    International Nuclear Information System (INIS)

    Irujo, M.J.; Bucci, J.R.

    1987-04-01

    Volume reduction of solid and liquid low-level waste has been demonstrated at the Savannah River Plant (SRP) in the Waste Management Beta-Gamma Incinerator facility (BGI). The BGI uses a two-stage, controlled-air incinerator capable of processing 180 kg/hr (400 lbs/hr) of solid waste or 150 liters/hr (40 gal/hr) of liquid waste. These wastes are pyrolyzed in a substoichiometric air environment at 900 to 1100 degrees Celsius in the primary chamber. Products of partial combustion from the primary chamber are oxidized at 950 to 1150 degrees Celsius in the secondary chamber. A spray dryer, baghouse,and HEPA filter unit cool and filter the incinerator offgases. 2 refs., 9 tabs

  20. Population Estimates for Chum Salmon Spawning in the Mainstem Columbia River, 2002 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rawding, Dan; Hillson, Todd D. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-11-15

    Accurate and precise population estimates of chum salmon (Oncorhynchus keta) spawning in the mainstem Columbia River are needed to provide a basis for informed water allocation decisions, to determine the status of chum salmon listed under the Endangered Species Act, and to evaluate the contribution of the Duncan Creek re-introduction program to mainstem spawners. Currently, mark-recapture experiments using the Jolly-Seber model provide the only framework for this type of estimation. In 2002, a study was initiated to estimate mainstem Columbia River chum salmon populations using seining data collected while capturing broodstock as part of the Duncan Creek re-introduction. The five assumptions of the Jolly-Seber model were examined using hypothesis testing within a statistical framework, including goodness of fit tests and secondary experiments. We used POPAN 6, an integrated computer system for the analysis of capture-recapture data, to obtain maximum likelihood estimates of standard model parameters, derived estimates, and their precision. A more parsimonious final model was selected using Akaike Information Criteria. Final chum salmon escapement estimates and (standard error) from seining data for the Ives Island, Multnomah, and I-205 sites are 3,179 (150), 1,269 (216), and 3,468 (180), respectively. The Ives Island estimate is likely lower than the total escapement because only the largest two of four spawning sites were sampled. The accuracy and precision of these estimates would improve if seining was conducted twice per week instead of weekly, and by incorporating carcass recoveries into the analysis. Population estimates derived from seining mark-recapture data were compared to those obtained using the current mainstem Columbia River salmon escapement methodologies. The Jolly-Seber population estimate from carcass tagging in the Ives Island area was 4,232 adults with a standard error of 79. This population estimate appears reasonable and precise but batch

  1. Project Based Learning experiences in the space engineering education at Technical University of Madrid

    Science.gov (United States)

    Rodríguez, Jacobo; Laverón-Simavilla, Ana; del Cura, Juan M.; Ezquerro, José M.; Lapuerta, Victoria; Cordero-Gracia, Marta

    2015-10-01

    This work describes the innovation activities performed in the field of space education since the academic year 2009/10 at the Technical University of Madrid (UPM), in collaboration with the Spanish User Support and Operations Center (E-USOC), the center assigned by the European Space Agency (ESA) in Spain to support the operations of scientific experiments on board the International Space Station. These activities have been integrated within the last year of the UPM Aerospace Engineering degree. A laboratory has been created, where students have to validate and integrate the subsystems of a microsatellite using demonstrator satellites. In parallel, the students participate in a Project Based Learning (PBL) training process in which they work in groups to develop the conceptual design of a space mission. One student in each group takes the role of project manager, another one is responsible for the mission design and the rest are each responsible for the design of one of the satellite subsystems. A ground station has also been set up with the help of students developing their final thesis, which will allow future students to perform training sessions and learn how to communicate with satellites, how to receive telemetry and how to process the data. Several surveys have been conducted along two academic years to evaluate the impact of these techniques in engineering learning. The surveys evaluate the acquisition of specific and generic competences, as well as the students' degree of satisfaction with respect to the use of these learning methodologies. The results of the surveys and the perception of the lecturers show that PBL encourages students' motivation and improves their results. They not only acquire better technical training, but also improve their transversal skills. It is also pointed out that this methodology requires more dedication from lecturers than traditional methods.

  2. The deep geothermal project in Lavey, Switzerland - Phase B: Technical and financial feasibility study - Synthesis report; Projet de geothermie profonde a Lavey (VD). Phase B : Etude de faisabilite technicofinanciere - Rapport de synthese

    Energy Technology Data Exchange (ETDEWEB)

    Bianchetti, G.; Crestin, G. [Alpgeo Sarl, Sierre (Switzerland); Dewarrat, P.; Perritaz, D. [Energie Concept SA, Bulle, (Switzerland)] [and others

    2009-06-15

    An overview of the deep geothermal project in Lavey, Switzerland is presented. The site is located near the Rhone river, where this river crosses a mountain chain in the Alps. The geology of the region is described. A well known spa is located in Lavey. The aim of the project is to generate power and deliver heat to a local district heating. Two wells should be bored to capture underground water at an appropriate temperature. The present report summarises the previous studies and focuses on the technical and financial feasibility of the future cogeneration plant. In particular, it presents the foreseen installations and the potential heat users. The costs are estimated in several possible boring scenarios. The most promising strategy is similar to that adopted decades ago in the Austrian spa of Bad Blumau. It combines geothermal energy and biomass. A business plan is presented. Recommendations for the next steps are given.

  3. Reflecting socio-technical combinations in radioactive waste management. Results from the InSOTEC European research project

    International Nuclear Information System (INIS)

    Kallenbach-Herbert, Beate; Bergmans, Anne; Martell, Meritxell; Schroeder, Jantine

    2015-01-01

    InSOTEC is a three-year collaborative social sciences research project funded under the European Atomic Energy Community's 7th Framework Programme FP7. The project aims to generate a better understanding of the complex interplay between the technical and the social in the context of geological disposal of radioactive waste. In doing so, InSOTEC has moved beyond the social and technical division that is frequently being found in this context by - investigating the consideration of social sciences and the recognition of socio-technical combinations in research programs on geological disposal, - analyzing the socio-technical entanglement in selected contexts like siting, reversibility and retrievability, demonstrating safety and technology transfer on the basis of case studies, and - exploring the integration of diverse stakeholders in technology oriented networks. The analyses reveal that activities in the context of geological disposal, whether related to research, planning, siting etc., rather support the divide of social and technical aspects than fostering the consideration of their entanglement. Reasons identified for this are manifold. The wish to reduce complexity by focusing stakeholder involvement on social questions and fixing the technical part ''when acceptance is reached'' is only one of them. However, the analyses also show that over the long timescales of repository planning and implementation, robust management strategies must provide the flexibility to adapt to both technical and social developments and demands. Understanding the socio-technical interplay and creating structures for its consideration provides the basis for dealing with this challenge. This presentation will focus on the main findings of the InSOTEC project with regard to the consideration of socio-technical combinations in practice. These insights are currently under development and will be finalized at the end of the project in June 2014. We will reflect on

  4. Reflecting socio-technical combinations in radioactive waste management. Results from the InSOTEC European research project

    Energy Technology Data Exchange (ETDEWEB)

    Kallenbach-Herbert, Beate [Oeko-Institut e.V., Darmstadt (Germany); Bergmans, Anne [Antwerp Univ. (Belgium); Martell, Meritxell [Merience Strategic Thinking, Olerdola (Spain); Schroeder, Jantine [Antwerp Univ. (Belgium); SCK - CEN, Mol (Belgium)

    2015-07-01

    InSOTEC is a three-year collaborative social sciences research project funded under the European Atomic Energy Community's 7th Framework Programme FP7. The project aims to generate a better understanding of the complex interplay between the technical and the social in the context of geological disposal of radioactive waste. In doing so, InSOTEC has moved beyond the social and technical division that is frequently being found in this context by - investigating the consideration of social sciences and the recognition of socio-technical combinations in research programs on geological disposal, - analyzing the socio-technical entanglement in selected contexts like siting, reversibility and retrievability, demonstrating safety and technology transfer on the basis of case studies, and - exploring the integration of diverse stakeholders in technology oriented networks. The analyses reveal that activities in the context of geological disposal, whether related to research, planning, siting etc., rather support the divide of social and technical aspects than fostering the consideration of their entanglement. Reasons identified for this are manifold. The wish to reduce complexity by focusing stakeholder involvement on social questions and fixing the technical part ''when acceptance is reached'' is only one of them. However, the analyses also show that over the long timescales of repository planning and implementation, robust management strategies must provide the flexibility to adapt to both technical and social developments and demands. Understanding the socio-technical interplay and creating structures for its consideration provides the basis for dealing with this challenge. This presentation will focus on the main findings of the InSOTEC project with regard to the consideration of socio-technical combinations in practice. These insights are currently under development and will be finalized at the end of the project in June 2014. We will reflect on

  5. Cesium Ion Exchange Program at the Hanford River Protection Project Waste Treatment Plant

    International Nuclear Information System (INIS)

    CHARLES, NASH

    2004-01-01

    The River Protection Project - Hanford Tank Waste Treatment and Immobilization Plant will use cesium ion exchange to remove 137Cs from Low Activity Waste down to 0.3 Ci/m3 in the Immobilized LAW, ILAW product. The project baseline for cesium ion exchange is the elutable SuperLig, R, 644, SL-644, resin registered trademark of IBC Advanced Technologies, Inc., American Fork, UT or the Department of Energy approved equivalent. SL-644 is solely available through IBC Advanced Technologies. To provide an alternative to this sole-source resin supply, the RPP--WTP initiated a three-stage process for selection and qualification of an alternative ion exchange resin for cesium removal in the RPPWTP. It was recommended that resorcinol formaldehyde RF be pursued as a potential alternative to SL-644

  6. Compliance Monitoring of Underwater Blasting for Rock Removal at Warrior Point, Columbia River Channel Improvement Project, 2009/2010

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.; Woodley, Christa M.; Skalski, J. R.; Seaburg, Adam

    2011-05-10

    The U.S. Army Corps of Engineers, Portland District (USACE) conducted the 20-year Columbia River Channel Improvement Project (CRCIP) to deepen the navigation channel between Portland, Oregon, and the Pacific Ocean to allow transit of fully loaded Panamax ships (100 ft wide, 600 to 700 ft long, and draft 45 to 50 ft). In the vicinity of Warrior Point, between river miles (RM) 87 and 88 near St. Helens, Oregon, the USACE conducted underwater blasting and dredging to remove 300,000 yd3 of a basalt rock formation to reach a depth of 44 ft in the Columbia River navigation channel. The purpose of this report is to document methods and results of the compliance monitoring study for the blasting project at Warrior Point in the Columbia River.

  7. People's perception on impacts of hydro-power projects in Bhagirathi river valley, India.

    Science.gov (United States)

    Negi, G C S; Punetha, Disha

    2017-04-01

    The people's perception on environmental and socio-economic impacts due to three hydro-electric projects (HEPs; commissioned and under construction) were studied in the north-west Indian Himalaya. Surveys among 140 project-affected people (PAPs) using a checklist of impacts indicate that among the negative impacts, decrease in flora/fauna, agriculture, flow of river, aesthetic beauty; and increase in water pollution, river bed quarrying for sand/stone, human settlement on river banks and social evils; and among the positive impacts, increase in standard of living, road connectivity, means of transport, public amenities, tourism and environmental awareness were related with HEPs. The PAPs tend to forget the negative impacts with the age of the HEPs after it becomes functional, and the positive impacts seem to outweigh the negative impacts. Study concludes that it is difficult to separate the compounding impacts due to HEP construction and other anthropogenic and natural factors, and in the absence of cause-and-effect analyses, it is hard to dispel the prevailing notion that HEPs are undesirable in the study area that led to agitations by the environmentalists and stopped construction of one of these HEPs. To overcome the situation, multi-disciplinary scientific studies involving the PAPs need to be carried out in planning and decision-making to make HEPs environment friendly and sustainable in this region. There is also a need to adopt low carbon electric power technologies and promote a decentralized energy strategy through joint ventures between public and private companies utilizing locally available renewable energy resources.

  8. Ecological effects and potential risks of the water diversion project in the Heihe River Basin.

    Science.gov (United States)

    Zhang, Mengmeng; Wang, Shuai; Fu, Bojie; Gao, Guangyao; Shen, Qin

    2018-04-01

    To curb the severe ecological deterioration in the lower Heihe River Basin (HRB) in northwest China, a water diversion project was initiated in 2000. A comprehensive analysis of the ecological effects and potential risks associated with the project is needed. We assessed the hydrological and ecological achievements, and also analyzed the potential problems after the project was completed. We found that since the project began the hydrological regime has changed, with more than 57.82% of the upstream water being discharged to the lower reaches on average. As a result, the groundwater level in the lower reaches has risen; the terminal lake has gradually expanded to a maximum area in excess of 50km 2 since 2010, and there has been a significant recovery of vegetation in the riparian zone and the Ejin core oases, which represents the initial rehabilitation of the degraded downstream environment. Additionally, the economy of Ejin has developed spectacularly, with an annual growth rate of 28.06%. However, in the middle reaches, the average groundwater level has continuously declined by a total of 5.8m and significant degradation of the vegetation has occurred along the river course. The discrepancy in the water allocation between the middle and lower reaches has intensified. This highlights the inability of the current water diversion scheme to realize further ecological restoration and achieve sustainable development throughout the whole basin. In future water management programs, we recommend that water allocation is coordinated by considering the basin as an integrated entity and to scientifically determine the size of the midstream farmland and downstream oasis; restrict non-ecological water use in the lower reaches, and jointly dispatch the surface water and groundwater. Copyright © 2017 Elsevier B.V. All rights reserved.

  9. Multi-Model Projections of River Flood Risk in Europe under Global Warming

    Directory of Open Access Journals (Sweden)

    Lorenzo Alfieri

    2018-01-01

    Full Text Available Knowledge on the costs of natural disasters under climate change is key information for planning adaptation and mitigation strategies of future climate policies. Impact models for large scale flood risk assessment have made leaps forward in the past few years, thanks to the increased availability of high resolution climate projections and of information on local exposure and vulnerability to river floods. Yet, state-of-the-art flood impact models rely on a number of input data and techniques that can substantially influence their results. This work compares estimates of river flood risk in Europe from three recent case studies, assuming global warming scenarios of 1.5, 2, and 3 degrees Celsius from pre-industrial levels. The assessment is based on comparing ensemble projections of expected damage and population affected at country level. Differences and common points between the three cases are shown, to point out main sources of uncertainty, strengths, and limitations. In addition, the multi-model comparison helps identify regions with the largest agreement on specific changes in flood risk. Results show that global warming is linked to substantial increase in flood risk over most countries in Central and Western Europe at all warming levels. In Eastern Europe, the average change in flood risk is smaller and the multi-model agreement is poorer.

  10. Evaluation of Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L.; Thom, Ronald M.; Roegner, G. Curtis; Ebberts, Blaine D.; Skalski, John R.; Borde, Amy B.; Dawley, Earl; Coleman, Andre M.; Woodruff, Dana L.; Breithaupt, Stephen A.; Cameron, April; Corbett, C.; Donley, Erin E.; Jay, D. A.; Ke, Yinghai; Leffler, K.; McNeil, C.; Studebaker, Cindy; Tagestad, Jerry D.

    2012-05-01

    This is the seventh and final annual report of a project (2004–2010) addressing evaluation of the cumulative effects of habitat restoration actions in the 235-km-long lower Columbia River and estuary. The project, called the Cumulative Effects (CE) study, was conducted for the U.S. Army Corps of Engineers Portland District by a collaboration of research agencies led by the Pacific Northwest National Laboratory. We achieved the primary goal of the CE study to develop a methodology to evaluate the cumulative effects of habitat actions in the Columbia Estuary Ecosystem Restoration Program. We delivered 1) standard monitoring protocols and methods to prioritize monitoring activities; 2) the theoretical and empirical basis for a CE methodology using levels-of-evidence; 3) evaluations of cumulative effects using ecological relationships, geo-referenced data, hydrodynamic modeling, and meta-analyses; and 4) an adaptive management process to coordinate and coalesce restoration efforts in the LCRE. A solid foundation has been laid for future comprehensive evaluations of progress made by the Columbia Estuary Ecosystem Restoration Program to understand, conserve, and restore ecosystems in the lower Columbia River and estuary.

  11. Streamflow timing of mountain rivers in Spain: Recent changes and future projections

    Science.gov (United States)

    Morán-Tejeda, Enrique; Lorenzo-Lacruz, Jorge; López-Moreno, Juan Ignacio; Rahman, Kazi; Beniston, Martin

    2014-09-01

    Changes in streamflow timing are studied in 27 mountain rivers in Spain, in the context of climate warming. The studied rivers are characterized by a highflows period in spring due to snowmelt, although differences in the role of snow and consequently in the timing of flows are observed amongst cases. We calculated for every year of the studied period (1976-2008) various hydrological indices that enable locating the timing of spring flows within the annual hydrologic regime, including the day of 75% of mass, and the day of spring maximum. The evolution of these indices was compared with that of seasonal precipitation and temperature, and trends in time were calculated. Results show a general negative trend in the studied indices which indicates that spring peaks due to snowmelt are shifting earlier within the hydrological year. Spring temperatures, which show a significant increasing trend, are the main co-variable responsible for the observed changes in the streamflow timing. In a second set of analyses we performed hydrological simulations with the SWAT model, in order to estimate changes in streamflow timing under projected warming temperatures. Projections show further shifting of spring peak flows along with a more pronounced low water level period in the summer. The simulations also allowed quantifying the role of snowfall-snowmelt on the observed changes in streamflow.

  12. Snake River Sockeye Salmon Sawtooth Valley Project Conservation and Rebuilding Program : Supplemental Fnal Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    This document announces Bonneville Power Administration`s (BPA) proposal to fund three separate but interrelated actions which are integral components of the overall Sawtooth Valley Project to conserve and rebuild the Snake River Sockeye salmon run in the Sawtooth Valley of south-central Idaho. The three actions are as follows: (1) removing a rough fish barrier dam on Pettit Lake Creek and constructing a weir and trapping facilities to monitor future sockeye salmon adult and smolt migration into and out of Pettit Lake; (2) artificially fertilizing Readfish Lake to enhance the food supply for Snake River sockeye salmon juveniles released into the lake; and (3) trapping kokanee fry and adults to monitor the fry population and to reduce the population of kokanee in Redfish Lake. BPA has prepared a supplemental EA (included) which builds on an EA compled in 1994 on the Sawtooth Valley Project. Based on the analysis in this Supplemental EA, BPA has determined that the proposed actions are not major Federal actions significantly affecting the quality of the human environment. Therefore an Environmental Impact Statement is not required.

  13. Projected impacts of climate change on hydrology, water resource use and adaptation needs for the Chu and Talas cross-border rivers basin, Central Asia

    Science.gov (United States)

    Shamil Iliasov, Shamil; Dolgikh, Svetlana; Lipponen, Annukka; Novikov, Viktor

    2014-05-01

    The observed long-term trends, variability and projections of future climate and hydrology of the Chu and Talas transboundary rivers basin were analysed using a common approach for Kazakhstan and Kyrgyzstan parts of the basin. Historical, current and forecasted demands and main uses of water in the basin were elaborated by the joint effort of both countries. Such cooperative approach combining scientific data, water practitioners' outlook with decision making needs allowed the first time to produce a comprehensive assessment of climate change impacts on water resources in the Chu-Talas transboundary rivers basin, identify future needs and develop the initial set of adaptation measures and recommendations. This work was carried out under the project "Promoting Cooperation to Adapt to Climate Change in the Chu and Talas Transboundary Basin", supported by the United Nations Economic Commission for Europe (UNECE) and the United Nations Development Programme (UNDP). Climate change projections, including air temperatures and rainfall in the 21st century were determined with a spatial resolution 0.5 degrees based on the integration of 15 climate change model outputs (derived from IPCC's 4th Assessment Report, and partially 5th Assessment Report) combined with locally-designed hydrology and glacier models. A significant increase in surface air temperatures by 3-6°C may be expected in the basin area, especially in summer and autumn. This change is likely to be accompanied by rainfall increase during the cold season and a decrease in the warm half of the year. As a result, a deterioration of moisture conditions during the summer-autumn period is possible. Furthermore, milder winters and hotter summers can be expected. Mountains will likely receive more liquid precipitation, than snow, while the area and volume of glaciers may significantly reduce. Projected changes in climate and glaciers have implications for river hydrology and different sectors of the economy dependent

  14. Project Manager’s Guide to the Scientific and Technical Information (STINFO) Program and Technical Publications Process

    Science.gov (United States)

    1993-12-01

    Iaporta .. y be definitive for the tubjoct proaentod, exploratory in natura, or an evaluation of critical Aubayato• or of technical problema , 4...International Security 9 Social and Natural Science Studies Field 41 Edit: (Type 3) -Entry of an invalid code when Performance Type is "C" or "M" will...analysis SF Foreign area social science research SP Foreign area policy planAing research BF Identifies databases with data on foreign forces or

  15. Savannah River Site sample and analysis plan for Clemson Technical Center waste

    International Nuclear Information System (INIS)

    Hagstrom, T.

    1998-04-01

    The purpose of this sampling and analysis plan is to determine the chemical, physical and radiological properties of the SRS radioactive Polychlorinated Biphenyl (PCB) liquid waste stream, to verify that it conforms to Waste Acceptance Criteria of the Department of Energy (DOE) East Tennessee Technology Park (ETTP) Toxic Substance Control Act (TSCA) Incineration Facility. Waste being sent to the ETTP TSCA Incinerator for treatment must be sufficiently characterized to ensure that the waste stream meets the waste acceptance criteria to ensure proper handling, classification, and processing of incoming waste to meet the Waste Storage and Treatment Facility's Operating Permits. This sampling and analysis plan is limited to WSRC container(s) of homogeneous or multiphasic radioactive PCB contaminated liquids generated in association with a treatability study at Clemson Technical Center (CTC) and currently stored at the WSRC Solid Waste Division Mixed Waste Storage Facility (MWSF)

  16. Habitat Evaluation Procedures (HEP) Report : Oleson Tracts of the Tualatin River National Wildlife Refuge, 2001-2002 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Allard, Donna; Smith, maureen; Schmidt, Peter

    2004-09-01

    Located in the northern Willamette River basin, Tualatin River National Wildlife Refuge (Refuge) was established in 1992 with an approved acquisition boundary to accommodate willing sellers with potentially restorable holdings within the Tualatin River floodplain. The Refuge's floodplain of seasonal and emergent wetlands, Oregon ash riparian hardwood, riparian shrub, coniferous forest, and Garry oak communities are representative of remnant plant communities historically common in the Willamette River valley and offer an opportunity to compensate for wildlife habitat losses associated with the Willamette River basin federal hydroelectric projects. The purchase of the Oleson Units as additions to the Refuge using Bonneville Power Administration (BPA) funds will partially mitigate for wildlife habitat and target species losses incurred as a result of construction and inundation activities at Dexter and Detroit Dams. Lands acquired for mitigation of Federal Columbia River Power System (FCRPS) impacts to wildlife are evaluated using the Habitat Evaluation Procedures (HEP) methodology, which quantifies how many Habitat Units (HUs) are to be credited to BPA. HUs or credits gained lessen BPA's debt, which was formally tabulated in the FCRPS Loss Assessments and adopted as part of the Northwest Power and Conservation Council's Fish and Wildlife Program as a BPA obligation (NWPCC, 1994 and 2000). There are two basic management scenarios to consider for this evaluation: (1) Habitats can be managed without restoration activities to benefit wildlife populations, or (2) Habitats can be restored using a number of techniques to improve habitat values more quickly. Without restoration, upland and wetland areas may be periodically mowed and disced to prevent invasion of exotic vegetation, volunteer trees and shrubs may grow to expand forested areas, and cooperative farming may be employed to provide forage for migrating and wintering waterfowl. Abandoned cropland

  17. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Easterbrooks, John A.; Pearsons, Todd N. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-03-01

    The Yakima/Klickitat Fisheries Project (YKFP) is a supplementation project sponsored by the Northwest Power Planning Council (Columbia River Basin Fish and Wildlife Program 1994, Measure 7.4K). The objectives of the YKFP are: (1) to test the hypothesis that new supplementation techniques can be used in the Yakima River Basin to increase natural production and to improve harvest opportunities while maintaining the long-term genetic fitness of the wild and native salmonid populations and keeping adverse ecological interactions within acceptable limits (Yakima Fisheries Project Final Environment Impact Statement, 1996); (2) provide knowledge about the use of supplementation, so that it may be used to mitigate effects on anadromous fisheries throughout the Columbia River Basin; (3) to maintain and improve the quantity and productivity of salmon and steelhead habitat, including those areas made accessible by habitat improvements; (4) to ensure that Project implementation remains consistent with the Council's Fish and Wildlife Program; and (5) to implement the Project in a prudent and environmentally sound manner. Current YKFP operations have been designed to test the principles of supplementation (Busack et al. 1997). The Project's experimental design has focused on the following critical uncertainties affecting supplementation: (1) The survival and reproductive success of hatchery fish after release from the hatchery; (2) The impacts of hatchery fish as they interact with non-target species and stocks; and, (3) The effects of supplementation on the long-term genetic fitness of fish stocks. The YKFP endorses an adaptive management policy applied through a project management framework as described in the Yakima/Klickitat Fisheries Project Planning Status Report (1995), Fast and Craig (1997), Clune and Dauble 1991. The project is managed by a Policy Group consisting of a representative of the Yakama Nation (YN, lead agency) and a representative of the Washington

  18. Technical Area V (TA-V) transformation project close-out report.

    Energy Technology Data Exchange (ETDEWEB)

    2010-07-01

    Sandia National Laboratories (SNL) Technical Area V (TA-V) has provided unique nuclear experimental environments for decades. The technologies tested in TA-V facilities have furthered the United States Nuclear Weapons program and has contributed to the national energy and homeland security mission. The importance of TA-V working efficiently to produce an attractive and effective platform for experiments should not be underestimated. Throughout its brief history, TA-V has evolved to address multiple and diverse sets of requirements. These requirements evolved over many years; however, the requirements had not been managed nor communicated comprehensively or effectively. A series of programmatic findings over several years of external audits was evidence of this downfall. Today, these same requirements flow down through a new TA-V management system that produces consistently applied and reproducible approaches to work practices. In 2008, the TA-V department managers assessed the state of TA-V services and work activities to understand how to improve customer interfaces, stakeholders perceptions, and workforce efficiencies. The TA-V management team initiated the TA-V Transformation Project after they deemed the pre-June 2008 operational model to be ineffective in managing work and in providing integrated, continuous improvement to TA-V processes. This report summarizes the TA-V Transformation Project goals, activities, and accomplishments.

  19. Accelerator technical design report for high-intensity proton accelerator facility project, J-PARC

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-03-01

    This report presents the detail of the technical design of the accelerators for the High-Intensity Proton Accelerator Facility Project, J-PARC. The accelerator complex comprises a 400-MeV room-temperature linac (600-MeV superconducting linac), 3-GeV rapid-cycling synchrotron (RCS), and a 50-GeV synchrotron (MR). The 400-MeV beam is injected to the RCS, being accelerated to 3 GEV. The 1-MW beam thus produced is guided to the Materials Life Science Experimental Facility, with both the pulsed spallation neutron source and muon source. A part of the beam is transported to the MR, which provides the 0.75-MW beam to either the Nuclear and Fundamental Particle Experimental Facility or the Neutrino Production Target. On the other hand, the beam accelerated to 600 MeV by the superconducting linac is used for the Nuclear Waster Transmutation Experiment. In this way, this facility is unique, being multipurpose one, including many new inventions and Research and Development Results. This report is based upon the accomplishments made by the Accelerator Group and others of the Project Team, which is organized on the basis of the Agreement between JAERI and KEK on the Construction and Research and Development of the High-Intensity Proton Accelerator Facility. (author)

  20. TECHNICAL AND ECONOMIC SUBSTANTIATION OF PROJECTS OF THE AFFORDABLE HOUSING CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    KRAVCHUNOVSKA T. S.

    2015-12-01

    Full Text Available Summary. Problem statement. The development of inhabitant locality of Ukraine is characterized by significant differences in levels of socio and economic development. An excessive concentration of population and industry in large cities, inefficient, slow development of most medium and small cities, towns and villages, considerable territorial disproportions of economic development of the country, considerable shortcomings in the territorial organization of society are observed. At the same time the tendency of the total area of increasing of inhabitant locality. The lands are used inefficiently. Among the most common problems of inhabitant locality is the housing problem. When making a decision on the design of affordable housing construction is one of the most important stages in the development of the technique and economic substantiation of the project is determination of the advisability and effectiveness of construction. The substantiation of advisability and effectiveness of affordable housing based on the definition of technical and economic indicators of projects, one of the most important among them is the cost, in its calculation is necessary to take into account the influence of organizational and technological factors, reflecting the features of construction in condition of compacted construction. Purpose. Development of methodical recommendations on substantiation of cost construction of affordable housing in the conditions of compacted construction. Conclusion. To provide a processing and the analysis of data is necessary development of the applied software on the basis of the developed block scheme of justification of cost construction of affordable housing.

  1. Supervision and technical coordination of the German activities in the 2D/3D-project

    International Nuclear Information System (INIS)

    Mayinger, F.

    1988-01-01

    The German Federal Minister for Research and Technology, the Japanese Atomic Energy Bureau, represented by the Japan Atomic Energy Research Institute (JAERI) and the United States Nuclear Regulatory Commission (USNRC) made a contract to cooperate in the field of nuclear safety research with the aim to improve and to guarantee the safety of water-cooled nuclear reactors on an international basis by joint research activities in the 2D/3D-project. The necessity for these research activities results from gaps in the status of knowledge for a best-estimate analysis in emergency core cooling, from the legally established duty to minimize the radioactive emission to the environment as consequence of an incident, and from the effort to optimize the safeguard systems of nuclear reactors continuously and steadily. The activities which were performed in the frame of this project concentrated on the coordination of the experimental and theoretical work, as well as on the technical supervision with respect to an efficient attainment of the internationally aspired research aim and to an optimal adjustment with respect to the emergency core cooling problems of pressurized water reactors. (orig.) [de

  2. Red River Wildlife Management Area HEP Report, Habitat Evaluation Procedures, Technical Report 2004.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    2004-11-01

    A habitat evaluation procedures (HEP) analysis conducted on the 314-acre Red River Wildlife Management Area (RRWMA) managed by the Idaho Department of Fish and Game resulted in 401.38 habitat units (HUs). Habitat variables from six habitat suitability index (HSI) models, comprised of mink (Mustela vison), mallard (Anas platyrhynchos), common snipe (Capella gallinago), black-capped chickadee (Parus altricapillus), yellow warbler (Dendroica petechia), and white-tailed deer (Odocoileus virginianus), were measured by Regional HEP Team (RHT) members in August 2004. Cover types included wet meadow, riverine, riparian shrub, conifer forest, conifer forest wetland, and urban. HSI model outputs indicate that the shrub component is lacking in riparian shrub and conifer forest cover types and that snag density should be increased in conifer stands. The quality of wet meadow habitat, comprised primarily of introduced grass species and sedges, could be improved through development of ephemeral open water ponds and increasing the amount of persistent wetland herbaceous vegetation e.g. cattails (Typha spp.) and bulrushes (Scirpus spp.).

  3. Technical summary of groundwater quality protection program at the Savannah River Site, 1952--1986

    International Nuclear Information System (INIS)

    Heffner, J.D.

    1991-01-01

    This report provides information regarding the status of and groundwater quality at the waste sites at the Department of Energy's (DOE) Savannah River Site (SRS). Specific information provided for each waste site at SRS includes its location, size, inventory (when known), and history. Many waste sites at SRS are considered to be of little environmental concern because they contain nontoxic or inert material such as construction rubble and debris. Other waste sites, however, either are known to have had an effect on groundwater quality or are suspected of having the potential to affect groundwater. Monitoring wells have been installed at most of these sites; monitoring wells are scheduled for installation at the remaining sites. Results of the groundwater analyses from these monitoring wells, presented in the appendices, are used in the report to help identify potential contaminants of concern, if any, at each waste site. The list of actions proposed for each waste site in Christensen and Gordon's 1983 report are summarized, and an update is provided for each site. Planned actions for the future are also outlined

  4. Mid-21st century projections of hydroclimate in Western Himalayas and Satluj River basin

    Science.gov (United States)

    Tiwari, Sarita; Kar, Sarat C.; Bhatla, R.

    2018-02-01

    The Himalayan climate system is sensitive to global warming and climate change. Regional hydrology and the downstream water flow in the rivers of Himalayan origin may change due to variations in snow and glacier melt in the region. This study examines the mid-21st century climate projections over western Himalayas from the Coupled Model Intercomparison Project Phase 5 (CMIP5) global climate models under Representative Concentration Pathways (RCP) scenarios (RCP4.5 and RCP8.5). All the global climate models used in the present analysis indicate that the study region would be warmer by mid-century. The temperature trends from all the models studied here are statistically significant at 95% confidence interval. Multi-model ensemble spreads show that there are large differences among the models in their projections of future climate with spread in temperature ranging from about 1.5 °C to 5 °C over various areas of western Himalayas in all the seasons. Spread in precipitation projections lies between 0.3 and 1 mm/day in all the seasons. Major shift in the timing of evaporation maxima and minima is noticed. The GFDL_ESM2G model products have been downscaled to Satluj River basin using the weather research and forecast (WRF) model and impact of climate change on streamflow has been studied. The reduction of precipitation during JJAS is expected to be > 3-6 mm/day in RCP8.5 as compared to present climate. It is expected that precipitation amount shall increase over Satluj basin in future (mid-21st century) The soil and water assessment tool (SWAT) model has been used to simulate the Satluj streamflow for the present and future climate using GFDL_ESM2G precipitation and temperature data as well as the WRF model downscaled data. The computations using the global model data show that total annual discharge from Satluj will be less in future than that in present climate, especially in peak discharge season (JJAS). The SWAT model with downscaled output indicates that during

  5. Joint optimization scheduling for water conservancy projects in complex river networks

    Directory of Open Access Journals (Sweden)

    Qin Liu

    2017-01-01

    Full Text Available In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.

  6. Flathead River Instream Flow Investigation Project : Final Report 1996-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Miller, William J. (Miller Ecological Consultants., Fort Collins, CO); Ptacek, Jonathan A. (Miller Ecological Consultants, Inc., Fort Collins, CO)

    2003-09-01

    A modified Instream Flow Incremental Methodology (IFIM) approach was used on the mainstem Flathead River from the South Fork Flathead River downstream to Flathead Lake. The objective of this study was to quantify changes in habitat for the target fish species, bull trout (Salvelinus confluentus) and west slope cutthroat trout (Oncorhynchus clarki lewisi), as a function of discharge in the river. This approach used a combination of georeferenced field data for each study site combined with a two-dimensional hydraulic simulation of river hydraulic characteristics. The hydraulic simulations were combined with habitat suitability criteria in a GIS analysis format to determine habitat area as a function of discharge. Results of the analysis showed that habitat area is more available at lower discharges than higher discharges and that in comparison of the pre-dam hydrology with post-dam hydrology, the stable pre-dam baseflows provided more stable habitat than the highly variable flow regime during both summer and winter baseflow post-dam periods. The variability week to week and day to day under post-dam conditions waters and dewaters stream margins. This forces sub-adult fish, in particular bull trout, to use less productive habitat during the night. There is a distinct difference between daytime and nighttime habitat use for bull trout sub-adults. The marginal areas that are constantly wet and then dried provide little in productivity for lower trophic levels and consequently become unproductive for higher trophic levels, especially bull trout sub-adults that use those areas as flows increase. A stable flow regime would be more productive than flow regimes with high variability week to week. The highly variable flows likely put stress on a bull trout subadult and west slope cutthroat trout, due to the additional movement required to find suitable habitat. The GIS approach presented here provides both a visual characterization of habitat as well as Arcview project data

  7. Simulated hydrologic response to projected changes in precipitation and temperature in the Congo River basin

    Directory of Open Access Journals (Sweden)

    N. Aloysius

    2017-08-01

    Full Text Available Despite their global significance, the impacts of climate change on water resources and associated ecosystem services in the Congo River basin (CRB have been understudied. Of particular need for decision makers is the availability of spatial and temporal variability of runoff projections. Here, with the aid of a spatially explicit hydrological model forced with precipitation and temperature projections from 25 global climate models (GCMs under two greenhouse gas emission scenarios, we explore the variability in modeled runoff in the near future (2016–2035 and mid-century (2046–2065. We find that total runoff from the CRB is projected to increase by 5 % [−9 %; 20 %] (mean – min and max – across model ensembles over the next two decades and by 7 % [−12 %; 24 %] by mid-century. Projected changes in runoff from subwatersheds distributed within the CRB vary in magnitude and sign. Over the equatorial region and in parts of northern and southwestern CRB, most models project an overall increase in precipitation and, subsequently, runoff. A simulated decrease in precipitation leads to a decline in runoff from headwater regions located in the northeastern and southeastern CRB. Climate model selection plays an important role in future projections for both magnitude and direction of change. The multimodel ensemble approach reveals that precipitation and runoff changes under business-as-usual and avoided greenhouse gas emission scenarios (RCP8.5 vs. RCP4.5 are relatively similar in the near term but deviate in the midterm, which underscores the need for rapid action on climate change adaptation. Our assessment demonstrates the need to include uncertainties in climate model and emission scenario selection during decision-making processes related to climate change mitigation and adaptation.

  8. Simulated hydrologic response to projected changes in precipitation and temperature in the Congo River basin

    Science.gov (United States)

    Aloysius, Noel; Saiers, James

    2017-08-01

    Despite their global significance, the impacts of climate change on water resources and associated ecosystem services in the Congo River basin (CRB) have been understudied. Of particular need for decision makers is the availability of spatial and temporal variability of runoff projections. Here, with the aid of a spatially explicit hydrological model forced with precipitation and temperature projections from 25 global climate models (GCMs) under two greenhouse gas emission scenarios, we explore the variability in modeled runoff in the near future (2016-2035) and mid-century (2046-2065). We find that total runoff from the CRB is projected to increase by 5 % [-9 %; 20 %] (mean - min and max - across model ensembles) over the next two decades and by 7 % [-12 %; 24 %] by mid-century. Projected changes in runoff from subwatersheds distributed within the CRB vary in magnitude and sign. Over the equatorial region and in parts of northern and southwestern CRB, most models project an overall increase in precipitation and, subsequently, runoff. A simulated decrease in precipitation leads to a decline in runoff from headwater regions located in the northeastern and southeastern CRB. Climate model selection plays an important role in future projections for both magnitude and direction of change. The multimodel ensemble approach reveals that precipitation and runoff changes under business-as-usual and avoided greenhouse gas emission scenarios (RCP8.5 vs. RCP4.5) are relatively similar in the near term but deviate in the midterm, which underscores the need for rapid action on climate change adaptation. Our assessment demonstrates the need to include uncertainties in climate model and emission scenario selection during decision-making processes related to climate change mitigation and adaptation.

  9. Projections of Flood Risk using Credible Climate Signals in the Ohio River Basin

    Science.gov (United States)

    Schlef, K.; Robertson, A. W.; Brown, C.

    2017-12-01

    Estimating future hydrologic flood risk under non-stationary climate is a key challenge to the design of long-term water resources infrastructure and flood management strategies. In this work, we demonstrate how projections of large-scale climate patterns can be credibly used to create projections of long-term flood risk. Our study area is the northwest region of the Ohio River Basin in the United States Midwest. In the region, three major teleconnections have been previously demonstrated to affect synoptic patterns that influence extreme precipitation and streamflow: the El Nino Southern Oscillation, the Pacific North American pattern, and the Pacific Decadal Oscillation. These teleconnections are strongest during the winter season (January-March), which also experiences the greatest number of peak flow events. For this reason, flood events are defined as the maximum daily streamflow to occur in the winter season. For each gage in the region, the location parameter of a log Pearson type 3 distribution is conditioned on the first principal component of the three teleconnections to create a statistical model of flood events. Future projections of flood risk are created by forcing the statistical model with projections of the teleconnections from general circulation models selected for skill. We compare the results of our method to the results of two other methods: the traditional model chain (i.e., general circulation model projections to downscaling method to hydrologic model to flood frequency analysis) and that of using the historic trend. We also discuss the potential for developing credible projections of flood events for the continental United States.

  10. Aspects of the role of scientific-technical expert knowledge in administrative court procedures on licensing of large technical projects

    International Nuclear Information System (INIS)

    Wagner, H.

    1983-01-01

    On the basis of atomic energy law, the author explains some specific problems associated with the respective roles of experts (or expert bodies) and courts of law. In legal theory, it is comparatively easy to draw the line between the two functions, but in practice this delimination meets with difficulties. Finally, the author proposes to improve the definitions of the respective functions of experts (expert bodies) and courts of law in procedures dealing with permits of large technical facilities as follows: A highly qualified, independent body of experts in a technically representative composition lays down, in a binding way, the main elements of the safety standard of a specific plant or type of plant. The responsible administrative authority, after having examined all other legal conditions, grants the permit for that plant. There are no objections to such a model in the light either of aspects of constitutional law or of legal policy or constitutional policy, not are there any practical reasons against this approach. The only doubtful aspect is the present political feasibility. (orig.) [de

  11. Ecological response of a multi-purpose river development project using macro-invertebrates richness and fish habitat value

    International Nuclear Information System (INIS)

    Pellaud, M.

    2007-05-01

    It has been acknowledged that river morphology and hydrology have been intensively altered due to the anthropic demands in floodplain land use and management, flood protection, promotion of navigability or energy production. Rivers were transformed in water highways, having lost contact with their surrounding floodplain as well as the plethora of ecological processes and occupants once thriving in these ecotonal zones. The identification of this emerging threat of morphological and hydrological alteration on ecological integrity adds further complexity in the exploitation of hydrosystem resources. These resources are heavily coveted and guarded by different lobbies each having strategic views on future project development. Stakeholders may want to promote hydro-electricity, ecologists a natural reserve, communes may wish to have an increased flood protection and leisure promoters a nautical center. As a result, the proposition of a river development project is certain to face opposition of one party or the other. The motivations of this dissertation are anchored in this context, where various and sometimes conflicting potentials for hydrosystem exploitation remain. This works aims at contributing scientifically to an innovative approach at the conception phase of a multi-purpose river development project by developing the ecological module to be implemented in the general project's optimizer. The SYNERGIE project hypothesis is that it should be possible to identify a synergetic pattern joining the interests of ecological integrity, flood safety, energy production and leisure development. Such a multi-objective river development project would stand more chance of acceptance. This dissertation focuses on the ecological aspects of such a river development project and an application on the regulated Swiss Upper Rhone River. Is expected an ecological answer to a river development project design / management which has to be compatible with Heller's Heller (2007) general

  12. 77 FR 30512 - Native American Career and Technical Education Program; Final Waivers and Extension of Project...

    Science.gov (United States)

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native American Career and Technical Education Program; Final Waivers and... American Career and Technical Education Program Catalog of Federal Domestic Assistance (CFDA) Number: 84... and Technical Education Program (NACTEP), the Secretary waives 34 CFR 75.250 and 75.261(c)(2) in order...

  13. The database system for the management of technical documentations of PWR fuel design project using CD-ROM

    International Nuclear Information System (INIS)

    Park, Bong Sik; Lee, Won Jae; Ryu, Jae Kwon; Jo, In Hang; Chang, Jong Hwa.

    1996-12-01

    In this report, the database system developed for the management of technical documentation of PWR fuel design project using CD-ROM (compact disk - read only memory) is described. The database system, KIRDOCM (KAERI Initial and Reload Fuel project technical documentation management), is developed and installed on PC using Visual Foxpro 3.0. Descriptions are focused on the user interface of the KIRDOCM. Introduction addresses the background and concept of the development. The main chapter describes the user requirements, the analysis of computing environment, the design of KIRDOCM, the implementation of the KIRDOCM, user's manual of KIRDOCM and the maintenance of the KIRDOCM for future improvement. The implementation of KIRDOCM system provides the efficiency in the management, maintenance and indexing of the technical documents. And, it is expected that KIRDOCM may be a good reference in applying Visual Foxpro for the development of information management system. (author). 2 tabs., 13 figs., 8 refs

  14. Public perception of an ecological rehabilitation project in inland river basins in northern China: Success or failure.

    Science.gov (United States)

    Feng, Qi; Miao, Zheng; Li, Zongxing; Li, Jianguo; Si, Jianhua; S, Yonghong; Chang, Zongqiang

    2015-05-01

    The need for environmental protection challenges societies to deal with difficult problems because strategies designed by scientists to protect the environment often create negative effects on impoverished local residents. We investigated the effects of China's national and regional policies related to environmental protection and rehabilitation projects in inland river basins, by studying the effect of projects in the Heihe and Shiyang river basins, in northwest China. Interviews and surveys were conducted at 30 sites in the lower reaches of these two arid basins, an area that has experienced severe ecological degradation. The survey results show the ecological rehabilitation projects adversely affected the livelihoods of 70.35% of foresters, 64.89% of farmers and 62.24% of herders in the Minqing region in the lower Shiyang River Basin; also, the projects negatively affected 51.9% of residents in the Ejin Qi in the lower Heihe River Basin. This caused 16.33% of foresters, 39.90% of farmers and 45.32% of herders in the Minqing region to not support the project and 37.5% of residents in the Ejin Qi region said they will deforest and graze again after the project ends. The negative impacts of the policies connected to the projects cause these attitudes. The projects prohibit felling and grazing and require residents to give up groundwater mining; this results in a great amount of uncompensated economic loss to them. Extensive survey data document the concerns of local residents, concerns that are supported by the calculation of actual incomes. In addition, the surveys results show poorer interviewees believe the projects greatly affected their livelihoods. While citizens in this region support environment protection work, the poor require considerable assistance if one expects them to support this type of work. Governmental assistance can greatly improve their living conditions, and hence encourage them to participate in and support the implementation of the projects

  15. Lower Red River Meadow Restoration Project : Biennial Report 1996-97.

    Energy Technology Data Exchange (ETDEWEB)

    LRK Communications; Wildlife Habitat Institute; Pocket Water, Inc.

    2003-07-01

    The Red River has been straightened and the riparian vegetation corridor eliminated in several reaches within the watershed. The river responded by incision resulting in over-steepened banks, increased sedimentation, elevated water temperatures, depressed groundwater levels, reduced floodplain function, and degraded fish habitat. The Lower Red River Meadow Restoration Project is a multi-phase ecosystem enhancement effort that restores natural physical and biological processes and functions to stabilize the stream channel and establish high quality habitats for fish and wildlife. A natural channel restoration philosophy guides the design and on the ground activities, allowing the channel to evolve into a state of dynamic equilibrium. Two years of planning, two years of restoration in Phases I and II, and one year post-restoration monitoring are complete. By excavating new bends and reconnecting historic meanders, Phase I and II channel realignment increased channel length by 3,060 feet, decreased channel gradient by 25 percent, and increased sinuosity from 1.7 to 2.3. Cross-sectional shapes and point bars were modified to maintain deep pool habitat at low flow and to reconnect the meadow floodplain. Improved soil moisture conditions will help sustain the 31,500 native riparian plantings reestablished within these two phases. Overall, short-term restoration performance was successful. Analyses of long-term parameters document either post-restoration baseline conditions or early stages of evolution toward desired conditions. An adaptive management strategy has helped to improve restoration designs, methods, and monitoring. Lessons learned are being transferred to a variety of audiences to advance the knowledge of ecological restoration and wise management of watersheds.

  16. Evaluation model of commercial geological exploration and mining development project and analysis of some technical problems in commercial negotiation

    International Nuclear Information System (INIS)

    Yao Zhenkai

    2012-01-01

    A composite evaluation model of commercial geological exploration and mining development project was discussed, this new model consists of polity-economy-technique (PET) synthetic evaluation sub-model and geology-mining-metallurgy (GMM) technique evaluation sub-model. Besides, some key technical problems in commercial negotiation, such as information screening, quoted price and analysis of deadline, were briefly analyzed. (author)

  17. Laboratory and project based learning in the compulsory course Biological Chemistry enhancing collaboration and technical communication between groups

    DEFF Research Database (Denmark)

    Agersø, Yvonne; Bysted, Anette; Jensen, Lars Bogø

    2011-01-01

    The aim of this paper was to describe how changes of laboratory training and project based learning were implemented in order to train the students in making a study design, basic laboratory skills, handling of data, technical communication, collaboration and presentation....

  18. Procedural Influence on Internal and External Assessment Scores of Undergraduate Vocational and Technical Education Research Projects in Nigerian Universities

    Science.gov (United States)

    A. C., John; Manabete, S. S.

    2015-01-01

    This study sought to determine the procedural influence on internal and external assessment scores of undergraduate research projects in vocational and technical education programmes in the university under study. A survey research design was used for the conduct of this study. The population consisted of 130 lecturers and 1,847 students in the…

  19. Habitat Evaluation Procedures (HEP) Report; Iskuulpa Wildlife Mitigation and Watershed Project, Technical Report 1998-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Quaempts, Eric

    2003-01-01

    U.S. Fish and Wildlife Service (USFWS) Habitat Evaluation Procedures (HEP) were used to determine the number of habitat units credited to evaluate lands acquired and leased in Eskuulpa Watershed, a Confederated Tribes of the Umatilla Indian Reservation watershed and wildlife mitigation project. The project is designed to partially credit habitat losses incurred by BPA for the construction of the John Day and McNary hydroelectric facilities on the Columbia River. Upland and riparian forest, upland and riparian shrub, and grasslands cover types were included in the evaluation. Indicator species included downy woodpecker (Picuides puhescens), black-capped chickadee (Pams atricopillus), blue grouse (Beadragapus obscurus), great blue heron (Ardea herodias), yellow warbler (Dendroica petschia), mink (Mustela vison), and Western meadowlark (Sturnello neglects). Habitat surveys were conducted in 1998 and 1999 in accordance with published HEP protocols and included 55,500 feet of transects, 678 m2 plots, and 243 one-tenth-acre plots. Between 123.9 and f 0,794.4 acres were evaluated for each indicator species. Derived habitat suitability indices were multiplied by corresponding cover-type acreages to determine the number of habitat units for each species. The total habitat units credited to BPA for the Iskuulpa Watershed Project and its seven indicator species is 4,567.8 habitat units. Factors limiting habitat suitability are related to the direct, indirect, and cumulative effects of past livestock grazing, road construction, and timber harvest, which have simplified the structure, composition, and diversity of native plant communities. Alternatives for protecting and improving habitat suitability include exclusion of livestock grazing or implementation of restoration grazing schemes, road de-commissioning, reforestation, large woody debris additions to floodplains, control of competing and unwanted vegetation, reestablishing displaced or reduced native vegetation species

  20. Determining Columbia and Snake River Project Tailrace and Forebay Zones of Hydraulic Influence using MASS2 Modeling

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Perkins, William A.

    2010-12-01

    Although fisheries biology studies are frequently performed at US Army Corps of Engineers (USACE) projects along the Columbia and Snake Rivers, there is currently no consistent definition of the ``forebay'' and ``tailrace'' regions for these studies. At this time, each study may use somewhat arbitrary lines (e.g., the Boat Restriction Zone) to define the upstream and downstream limits of the study, which may be significantly different at each project. Fisheries researchers are interested in establishing a consistent definition of project forebay and tailrace regions for the hydroelectric projects on the lower Columbia and Snake rivers. The Hydraulic Extent of a project was defined by USACE (Brad Eppard, USACE-CENWP) as follows: The river reach directly upstream (forebay) and downstream (tailrace) of a project that is influenced by the normal range of dam operations. Outside this reach, for a particular river discharge, changes in dam operations cannot be detected by hydraulic measurement. The purpose of this study was to, in consultation with USACE and regional representatives, develop and apply a consistent set of criteria for determining the hydraulic extent of each of the projects in the lower Columbia and Snake rivers. A 2D depth-averaged river model, MASS2, was applied to the Snake and Columbia Rivers. New computational meshes were developed most reaches and the underlying bathymetric data updated to the most current survey data. The computational meshes resolved each spillway bay and turbine unit at each project and extended from project to project. MASS2 was run for a range of total river flows and each flow for a range of project operations at each project. The modeled flow was analyzed to determine the range of velocity magnitude differences and the range of flow direction differences at each location in the computational mesh for each total river flow. Maps of the differences in flow direction and velocity magnitude were created. USACE

  1. Technical database and management system (DBMS) for the UMTRA project processing sites

    International Nuclear Information System (INIS)

    Hillman, R.L.; Mohr, D.E.

    1985-01-01

    The technical DBMS is a structured and organized method for collecting, storing, retrieving, and analyzing technical data based upon standard operating procedures and quality control measures. The automated environment created by this design exists both as a repository for processing site technical data and the analysis techniques used against this data for site characterization, evaluation, and design. The system is composed of diverse technical subjects that are collectively used to address remedial action problems associated with mill tailings disposal. These technical subjects include hydrology, geology, geochemistry, radiology, and engineering

  2. Assessment Approach for Identifying Compatibility of Restoration Projects with Geomorphic and Flooding Processes in Gravel Bed Rivers.

    Science.gov (United States)

    DeVries, Paul; Aldrich, Robert

    2015-08-01

    A critical requirement for a successful river restoration project in a dynamic gravel bed river is that it be compatible with natural hydraulic and sediment transport processes operating at the reach scale. The potential for failure is greater at locations where the influence of natural processes is inconsistent with intended project function and performance. We present an approach using practical GIS, hydrologic, hydraulic, and sediment transport analyses to identify locations where specific restoration project types have the greatest likelihood of working as intended because their function and design are matched with flooding and morphologic processes. The key premise is to identify whether a specific river analysis segment (length ~1-10 bankfull widths) within a longer reach is geomorphically active or inactive in the context of vertical and lateral stabilities, and hydrologically active for floodplain connectivity. Analyses involve empirical channel geometry relations, aerial photographic time series, LiDAR data, HEC-RAS hydraulic modeling, and a time-integrated sediment transport budget to evaluate trapping efficiency within each segment. The analysis segments are defined by HEC-RAS model cross sections. The results have been used effectively to identify feasible projects in a variety of alluvial gravel bed river reaches with lengths between 11 and 80 km and 2-year flood magnitudes between ~350 and 1330 m(3)/s. Projects constructed based on the results have all performed as planned. In addition, the results provide key criteria for formulating erosion and flood management plans.

  3. Assessment Approach for Identifying Compatibility of Restoration Projects with Geomorphic and Flooding Processes in Gravel Bed Rivers

    Science.gov (United States)

    DeVries, Paul; Aldrich, Robert

    2015-08-01

    A critical requirement for a successful river restoration project in a dynamic gravel bed river is that it be compatible with natural hydraulic and sediment transport processes operating at the reach scale. The potential for failure is greater at locations where the influence of natural processes is inconsistent with intended project function and performance. We present an approach using practical GIS, hydrologic, hydraulic, and sediment transport analyses to identify locations where specific restoration project types have the greatest likelihood of working as intended because their function and design are matched with flooding and morphologic processes. The key premise is to identify whether a specific river analysis segment (length ~1-10 bankfull widths) within a longer reach is geomorphically active or inactive in the context of vertical and lateral stabilities, and hydrologically active for floodplain connectivity. Analyses involve empirical channel geometry relations, aerial photographic time series, LiDAR data, HEC-RAS hydraulic modeling, and a time-integrated sediment transport budget to evaluate trapping efficiency within each segment. The analysis segments are defined by HEC-RAS model cross sections. The results have been used effectively to identify feasible projects in a variety of alluvial gravel bed river reaches with lengths between 11 and 80 km and 2-year flood magnitudes between ~350 and 1330 m3/s. Projects constructed based on the results have all performed as planned. In addition, the results provide key criteria for formulating erosion and flood management plans.

  4. Southwest Project: resource/institutional requirements analysis. Volume II. Technical studies

    Energy Technology Data Exchange (ETDEWEB)

    Ormsby, L. S.; Sawyer, T. G.; Brown, Dr., M. L.; Daviet, II, L. L.; Weber, E. R.; Brown, J. E.; Arlidge, J. W.; Novak, H. R.; Sanesi, Norman; Klaiman, H. C.; Spangenberg, Jr., D. T.; Groves, D. J.; Maddox, J. D.; Hayslip, R. M.; Ijams, G.; Lacy, R. G.; Montgomery, J.; Carito, J. A.; Ballance, J. W.; Bluemle, C. F.; Smith, D. N.; Wehrey, M. C.; Ladd, K. L.; Evans, Dr., S. K.; Guild, D. H.; Brodfeld, B.; Cleveland, J. A.; Hicks, K. L.; Noga, M. W.; Ross, A. M.

    1979-12-01

    The project provides information which could be used to accelerate the commercialization and market penetration of solar electric generation plants in the southwestern region of the United States. The area of concern includes Arizona, California, Colorado, Nevada, New Mexico, Utah, and sections of Oklahoma and Texas. The project evaluated the potential integration of solar electric generating facilities into the existing electric grids of the region through the year 2000. The technologies included wind energy conversion, solar thermal electric, solar photovoltaic conversion, and hybrid solar electric systems. Each of the technologies considered, except hybrid solar electric, was paired with a compatible energy storage system to improve plant performance and enhance applicability to a utility grid system. The hybrid concept utilizes a conventionally-fueled steam generator as well as a solar steam generator so it is not as dependent upon the availability of solar energy as are the other concepts. Operation of solar electric generating plants in conjunction with existing hydroelectric power facilities was also studied. The participants included 12 electric utility companies and a state power authority in the southwestern US, as well as a major consulting engineering firm. An assessment of the state-of-the-art of solar electric generating plants from an electric utility standpoint; identification of the electric utility industry's technical requirements and considerations for solar electric generating plants; estimation of the capital investment, operation, and maintenance costs for solar electric generating plants; and determination of the capital investment of conventional fossil and nuclear electric generating plants are presented. (MCW)

  5. Focus on CSIR research in pollution waste: South African national spatial biodiversity assessment 2004 (Technical report volume 2: river component)

    CSIR Research Space (South Africa)

    Roux, D

    2007-08-01

    Full Text Available the first ever systematic assessment of river biodiversity in South Africa. The approach and results should therefore be seen as the first attempt towards deriving a systematic and scientifically defensible method for identifying river heterogeneity...

  6. Winter road access to projected works in the diversion of the Little Whale River

    International Nuclear Information System (INIS)

    Goulet, R.

    1993-01-01

    The Great Whale hydroelectric complex in northern Quebec will require diversion of the Little Whale River, involving construction of dams 40 m and 30 m high and a canal 600 m long. The main mode of access to the construction sites will be a winter road, supplemented by an airfield designed for large-capacity aircraft. The method used by Hydro-Quebec in its environmental assessment of the winter road project is described. This method comprises five steps: delimitation of the study zone; establishment of a road corridor of choice by successively eliminating territory according to given constraints; description of the physical and biological environment; determination and optimization of the road route; and evaluation of potential impacts, along with establishment of measures to mitigate those impacts. The optimal routing is determined on the basis of criteria such as the presence of permafrost, the nature of the soils, avoidance of slopes steeper than 10%, and the depth and width of ice crossings

  7. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    1999-01-01

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment

  8. Environmental assessment for the A-01 outfall constructed wetlands project at the Savannah River Site

    International Nuclear Information System (INIS)

    1998-10-01

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021)

  9. Fort Cobb Reservoir Watershed, Oklahoma and Thika River Watershed, Kenya Twinning Pilot Project

    Science.gov (United States)

    Moriasi, D.; Steiner, J.; Arnold, J.; Allen, P.; Dunbar, J.; Shisanya, C.; Gathenya, J.; Nyaoro, J.; Sang, J.

    2007-12-01

    The Fort Cobb Reservoir Watershed (FCRW) (830 km2) is a watershed within the HELP Washita Basin, located in Caddo and Washita Counties, OK. It is also a benchmark watershed under USDA's Conservation Effects Assessment Project, a national project to quantify environmental effects of USDA and other conservation programs. Population in south-western Oklahoma, in which FCRW is located, is sparse and decreasing. Agricultural focuses on commodity production (beef, wheat, and row crops) with high costs and low margins. Surface and groundwater resources supply public, domestic, and irrigation water. Fort Cobb Reservoir and contributing stream segments are listed on the Oklahoma 303(d) list as not meeting water quality standards based on sedimentation, trophic level of the lake associated with phosphorus loads, and nitrogen in some stream segments in some seasons. Preliminary results from a rapid geomorphic assessment results indicated that unstable stream channels dominate the stream networks and make a significant but unknown contribution to suspended-sediment loadings. Impairment of the lake for municipal water supply, recreation, and fish and wildlife are important factors in local economies. The Thika River Watershed (TRW) (867 km2) is located in central Kenya. Population in TRW is high and increasing, which has led to a poor land-population ratio with population densities ranging from 250 people/km2 to over 500 people/km2. The poor land-population ratio has resulted in land sub-division, fragmentation, over- cultivation, overgrazing, and deforestation which have serious implications on soil erosion, which poses a threat to both agricultural production and downstream reservoirs. Agricultural focuses mainly on subsistence and some cash crops (dairy cattle, corn, beans, coffee, floriculture and pineapple) farming. Surface and groundwater resources supply domestic, public, and hydroelectric power generation water. Thika River supplies 80% of the water for the city of

  10. Application of a Sediment Information System to the Three Gorges Project on Yangtze River, China

    Science.gov (United States)

    Cao, Shuyou; Liu, Xingnian; Yang, Kejun; Li, Changzhi

    Based on survey and analysis of a huge number of observed entrance sediment transport data and the research results of physical and numerical modeling of Three Gorges Reservoir on the Yangtze River, a sediment information system was designed. The basis of this system includes spatial data and properties of geographic elements, and various documents involved to the Three Gorges Project (TGP). Database and knowledge base are constructed as the information bank. The running environment is constructed by the general control program to realize requirements about various sediment information. The system chooses the window software as the system software. The techniques of graphical user interfaces and groupware geographic information system are applied in this system. In this phase, the emphases of the system are development of document system, map system, and presentation system. Cross-section system of the TGP was also attached. For further improvement of the system, a prepared interface of decision supporting subsystem is finished.

  11. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Dawley, Earl M.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Russell, Micah; Skalski, John R.; Thom, Ronald M.; Vavrinec, John

    2008-10-01

    The goal of this multi-year study (2004-2010) is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the lower Columbia River and estuary. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. Field research in 2005, 2006, and 2007 involved intensive, comparative studies paired by habitat type (tidal swamp vs. marsh), trajectory (restoration vs. reference site), and restoration action (tide gate vs. culvert vs. dike breach). The field work established two kinds of monitoring indicators for eventual cumulative effects analysis: core and higher-order indicators. Management implications of limitations and applications of site-specific effectiveness monitoring and cumulative effects analysis were identified.

  12. STTR Phase 1 Final Technical Report for Project Entitled "Developing a Mobile Torrefaction Machine"

    Energy Technology Data Exchange (ETDEWEB)

    James, Joseph J. [President, ATP

    2014-03-11

    The goal of this project, sponsored by Agri-Tech Producers, LLC (ATP), the small business grantee, was to determine if the torrefaction technology, developed by North Carolina State University (NCSU), which ATP has licensed, could be feasibly deployed in a mobile unit. The study adds to the area investigated, by having ATP’s STTR Phase I team give thoughtful consideration to how to use NCSU’s technology in a mobile unit. The findings by ATP’s team were that NCSU’s technology would best perform in units 30’ by 80’ (See Spec Sheet for the Torre-Tech 5.0 Unit in the Appendix) and the technical effectiveness and economic feasibility investigation suggested that such units were not easily, efficiently or safely utilized in a forest or farm setting. (Note rendering of possible mobile system in the Appendix) Therefore, the findings by ATP’s team were that NCSU’s technology could not feasibly be deployed as a mobile unit.

  13. Water Quality Projects Summary for the Mid-Columbia and Cumberland River Systems

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, Kevin M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Witt, Adam M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hadjerioua, Boualem [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-04-01

    Scheduling and operational control of hydropower systems is accompanied with a keen awareness of the management of water use, environmental effects, and policy, especially within the context of strict water rights policy and generation maximization. This is a multi-objective problem for many hydropower systems, including the Cumberland and Mid-Columbia river systems. Though each of these two systems have distinct operational philosophies, hydrologic characteristics, and system dynamics, they both share a responsibility to effectively manage hydropower and the environment, which requires state-of-the art improvements in the approaches and applications for water quality modeling. The Department of Energy and Oak Ridge National Laboratory have developed tools for total dissolved gas (TDG) prediction on the Mid-Columbia River and a decision-support system used for hydropower generation and environmental optimization on the Cumberland River. In conjunction with IIHR - Hydroscience & Engineering, The University of Iowa and University of Colorado s Center for Advanced Decision Support for Water and Environmental Systems (CADSWES), ORNL has managed the development of a TDG predictive methodology at seven dams along the Mid-Columbia River and has enabled the ability to utilize this methodology for optimization of operations at these projects with the commercially available software package Riverware. ORNL has also managed the collaboration with Vanderbilt University and Lipscomb University to develop a state-of-the art method for reducing high-fidelity water quality modeling results into surrogate models which can be used effectively within the context of optimization efforts to maximize generation for a reservoir system based on environmental and policy constraints. The novel contribution of these efforts is the ability to predict water quality conditions with simplified methodologies at the same level of accuracy as more complex and resource intensive computing methods

  14. Hazardous materials in Aquatic environments of the Mississippi River basin. Quarterly project status report, 1 January 1994--30 March 1994

    Energy Technology Data Exchange (ETDEWEB)

    Abdelghani, A.

    1994-06-01

    Projects associated with this grant for studying hazardous materials in aquatic environments of the Mississippi River Basin are reviewed and goals, progress and research results are discussed. New, one-year initiation projects are described briefly.

  15. Detroit Works Long-Term Planning Project: Engagement Strategies for Blending Community and Technical Expertise

    Directory of Open Access Journals (Sweden)

    Toni L. Griffin

    2014-10-01

    Full Text Available In January 2013, civic leaders, community stakeholders, and residents came together to release Detroit Future City: 2012 Detroit Strategic Framework Plan, a guiding blueprint for transforming Detroit from its current state of population loss and excessive vacancy into a model for the reinvention of post-industrial American cities. Three years prior, the U.S. Census had reported that the city had lost 24% of its population over the last decade and had experienced a 20% increase in vacant and abandoned property, bringing total vacancy to roughly the size of Manhattan. In addition to physical and economic challenges, Detroiters had also acknowledged significant barriers to effective civic engagement. Foremost among these barriers were a profound sense of immobilization, planning fatigue, and a general perception of cynicism about planning and engagement efforts. These challenges were compounded by historic racial dynamics and tension. This case study elaborates on the comprehensive and innovative civic engagement executed in a citywide planning process called the Detroit Works Project, which took place from late 2010 through late 2012. For the citywide planning process to be successful and sustainable, civic leaders and project funders committed to a planning initiative that would be different from previous efforts, in large part because the “owners” of the process would be diverse and inclusive across all community sectors. The case study, written by three of the key consultants from the project, describes four key civic engagement strategies deployed in the creation of the strategic framework: (1 addressing profound challenges of culture, race, and politics by deliberately building trust; (2 elevating community expertise by fostering a sense of ownership of the process; (3 blending technical and community expertise; and (4 viewing civic engagement as an ongoing two-way conversation rather than a series of large-scale episodic events. This

  16. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, October 1, 1993--December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly project status report discusses research projects being conducted on hazardous materials in aquatic environments of the Mississippi River basin. We continued to seek improvement in our methods of communication and interactions to support the inter-disciplinary, inter-university collaborators within this program. In addition to the defined collaborative research teams, there is increasing interaction among investigators across projects. Planning for the second year of the project has included the development of our internal request for proposals, and refining the review process for selection of proposals for funding.

  17. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Pearsons, Todd N.; Easterbrooks, John A. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-09-01

    The Yakima/Klickitat Fisheries Project (YKFP) is a supplementation project sponsored by the Northwest Power Planning Council and funded by the Bonneville Power Administration. The YKFP has adopted the definition of supplementation described by Regional Assessment of Supplementation Program (1992), which is ''the use of artificial propagation in an attempt to maintain or increase natural production while maintaining the long-term fitness of the target population, and keeping the ecological and genetic impacts on nontarget populations within specified biological limits''. Recent scientific reviews of hatchery supplementation continue to highlight the experimental nature and risk of supplementation (Independent Scientific Group 1996; National Research Council 1996; Lichatowich 1999; Independent Multidisciplinary Science Team 2000; Independent Scientific Advisory Board 2003; Hatchery Scientific Review Group 2003). In addition, many of these reviews included recommendations about the best ways to operate a supplementation program. Most of these recommendations were already being done or have been incorporated into the YKFP. The objectives of the YKFP are: (1) to test the hypothesis that new supplementation techniques can be used in the Yakima River Basin to increase natural production and to improve harvest opportunities while maintaining the long-term genetic fitness of the wild and native salmonid populations and keeping adverse ecological interactions within acceptable limits (Yakima Fisheries Project Final Environment Impact Statement, 1996); (2) provide knowledge about the use of supplementation, so that it may be used to mitigate effects on anadromous fisheries throughout the Columbia River Basin; (3) to maintain and improve the quantity and productivity of salmon and steelhead habitat, including those areas made accessible by habitat improvements; (4) to ensure that Project implementation remains consistent with the Council's Fish and

  18. CHEMICAL SLUDGE HEEL REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT 8183

    International Nuclear Information System (INIS)

    Thaxton, D; Timothy Baughman, T

    2008-01-01

    Chemical Sludge Removal (CSR) is the final waste removal activity planned for some of the oldest nuclear waste tanks located at the Savannah River Site (SRS) in Aiken, SC. In 2008, CSR will be used to empty two of these waste tanks in preparation for final closure. The two waste tanks chosen to undergo this process have previously leaked small amounts of nuclear waste from the primary tank into an underground secondary containment pan. CSR involves adding aqueous oxalic acid to the waste tank in order to dissolve the remaining sludge heel. The resultant acidic waste solution is then pumped to another waste tank where it will be neutralized and then stored awaiting further processing. The waste tanks to be cleaned have a storage capacity of 2.84E+06 liters (750,000 gallons) and a target sludge heel volume of 1.89E+04 liters (5,000 gallons) or less for the initiation of CSR. The purpose of this paper is to describe the CSR process and to discuss the most significant technical issues associated with the development of CSR

  19. Data management for the Clinch River Breeder Reactor Plant Project by use of document status and hold systems

    International Nuclear Information System (INIS)

    Hunt, C.S.; Beck, A.E.; Akhtar, M.S.

    1982-01-01

    This paper describes the development, framework, and scope of the Document Status System and the Document Hold System for the Clinch River Breeder Reactor Plant Project. It shows how data are generated at five locations and transmitted to a central computer for processing and storage. The resulting computerized data bank provides reports needed to perform day-to-day management and engineering planning. Those reports also partially satisfy the requirements of the Project's Quality Assurance Program

  20. Technical progress in planning organization of the Ostravo-Karwina coal basin, ''Mining Projects of Ostravo''

    Energy Technology Data Exchange (ETDEWEB)

    Karpeta, B; Kolar, J

    1979-01-01

    Based on the main task of further improvement in labor productivity and improvement in the quality of products, the leading planning organization of the Ostravo-Karwina basin is planning and realizing progressive technological plans based on new equipment. Long-term plans for basin development up to 1990 stipulate a rise in capital investments by 180%, increase in the volume of productivity by 164% with a rise in the number of workers by 142%. Corresponding technical progress in planning is based on an improvement in the system of scientific-technical information, automation and technical equipping of the planning process, improvements in the forms and organizational structure. Organization of specialized research-planning groups to substantiate and to technically-economically evaluate technical progress, and also to develop comprehensive technical assignments is stipulated.

  1. A COMPREHENSIVE NONPOINT SOURCE FIELD STUDY FOR SEDIMENT, NUTRIENTS, AND PATHOGENS IN THE SOUTH FORK BROAD RIVER WATERSHED IN NORTHEAST GEORGIA

    Science.gov (United States)

    This technical report provides a description of the field project design, quality control, the sampling protocols and analysis methodology used, and standard operating procedures for the South Fork Broad River Watershed (SFBR) Total Maximum Daily Load (TMDL) project. This watersh...

  2. Data of groundwater from boreholes, river water and precipitation for the Horonobe Underground Research Laboratory project. 2011-2010

    Energy Technology Data Exchange (ETDEWEB)

    Amano, Yuki; Yamamoto, Yoichi; Nanjyo, Isao; Murakami, Hiroaki; Yokota, Hideharu; Yamazaki, Masanori; Iwatsuki, Teruki [Japan Atomic Energy Agency, Geological Isolation Research and Development Directorate, Horonobe, Hokkaido (Japan); Kunimaru, Takanori [Japan Atomic Energy Agency, Geological Isolation Research and Development Directorate, Mizunami, Gifu (Japan); Oyama, Takahiro [Central Research Inst. of Electric Power Industry, Tokyo (Japan)

    2012-02-15

    In the Horonobe Underground Research Laboratory (URL) Project, groundwater from boreholes, river water and precipitation have been analyzed for the environmental monitoring since the fiscal year 2001. This report shows the data set of water chemistry since the fiscal year 2001 to the fiscal year 2010. (author)

  3. Hanford Waste Simulants Created to Support the Research and Development on the River Protection Project - Waste Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Eibling, R.E.

    2001-07-26

    The development of nonradioactive waste simulants to support the River Protection Project - Waste Treatment Plant bench and pilot-scale testing is crucial to the design of the facility. The report documents the simulants development to support the SRTC programs and the strategies used to produce the simulants.

  4. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, 1 April--30 June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This report contains a cluster of twenty separate project reports concerning the fate, environmental transport, and toxicity of hazardous wastes in the Mississippi River Basin. Some of topics investigated involve: biological uptake and metabolism; heavy metal immobilization; biological indicators; toxicity; and mathematical models.

  5. Data of groundwater from boreholes, river water and precipitation for the Horonobe Underground Research Laboratory project. 2011-2010

    International Nuclear Information System (INIS)

    Amano, Yuki; Yamamoto, Yoichi; Nanjyo, Isao; Murakami, Hiroaki; Yokota, Hideharu; Yamazaki, Masanori; Iwatsuki, Teruki; Kunimaru, Takanori; Oyama, Takahiro

    2012-02-01

    In the Horonobe Underground Research Laboratory (URL) Project, groundwater from boreholes, river water and precipitation have been analyzed for the environmental monitoring since the fiscal year 2001. This report shows the data set of water chemistry since the fiscal year 2001 to the fiscal year 2010. (author)

  6. Evaluation of Bull Trout Movements in the Tucannon and Lower Snake Rivers, 2002-2006 Project Completion Summary.

    Energy Technology Data Exchange (ETDEWEB)

    Faler, Michael P. [U.S. Fish and Wildlife Service; Mendel, Glen; Fulton, Carl [Washington Department of Fish and Wildlife

    2008-11-20

    was small (n=6). In spite of this project's shortcomings, bull trout continue to be observed in low numbers at Snake River dam fish facilities. It is highly possible that bull trout observed at the Snake River dam fish facilities are originating from sources other than the Tucannon River. We suggest that these fish might come from upstream sources like the Clearwater or Salmon rivers in Idaho, and are simply following the outmigration of juvenile anadromous fish (a food supply) as they emigrate toward the Pacific Ocean. Based on our study results, we recommend abandoning radio telemetry as a tool to monitor bull trout movements in the mainstem Snake River. We do recommend continuing PIT tagging and tag interrogation activities to help determine the origin of bull trout using the Snake River hydropower facilities. As a complementary approach, we also suggest the use of genetic assignment tests to help determine the origin of these fish. Lastly, several recommendations are included in the report to help manage and recover bull trout in the Tucannon subbasin.

  7. Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2003 Smolt Acclimation and Adult Return Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

    2009-03-31

    The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the seventh season (1997-2003) of adult Chinook salmon broodstock collection in the Lostine River and the fifth season (1999-2003) of acclimating the resultant progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2003, acclimation of

  8. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Sampling and Analysis Plan and Operational Manual

    International Nuclear Information System (INIS)

    Passell, Howard D.; Barber, David S.; Betsill, J. David; Littlfield, Adriane C.; Mohagheghi, Amir H.; Shanks, Sonoya T.; Yuldashev, Bekhzad; Salikhbaev, Umar; Radyuk, Raisa; Djuraev, Akram; Djuraev, Amwar; Vasilev, Ivan; Tolongutov, Bajgabyl; Valentina, Alekhina; Solodukhin, Vladimir; Pozniak, Victor

    2002-01-01

    The transboundary nature of water resources demands a transboundary approach to their monitoring and management. However, transboundary water projects raise a challenging set of problems related to communication issues, and standardization of sampling, analysis and data management methods. This manual addresses those challenges and provides the information and guidance needed to perform the Navruz Project, a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. This manual provides guidelines for participants on sample and data collection, field equipment operations and procedures, sample handling, laboratory analysis, and data management. Also included are descriptions of rivers, sampling sites and parameters on which data are collected. Data obtained in this project are shared among all participating countries and the public through an internet web site, and are available for use in further studies and in regional transboundary water resource management efforts. Overall, the project addresses three main goals: to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and non-proliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources, proliferation concerns, or other factors.

  9. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Sampling and Analysis Plan and Operational Manual

    Energy Technology Data Exchange (ETDEWEB)

    Passell, Howard D.; Barber, David S.; Betsill, J. David; Littlfield, Adriane C.; Mohagheghi, Amir H.; Shanks, Sonoya T.; Yuldashev, Bekhzad; Salikhbaev, Umar; Radyuk, Raisa; Djuraev, Akram; Djuraev, Amwar; Vasilev, Ivan; Tolongutov, Bajgabyl; Valentina, Alekhina; Solodukhin, Vladimir; Pozniak, Victor

    2002-04-02

    The transboundary nature of water resources demands a transboundary approach to their monitoring and management. However, transboundary water projects raise a challenging set of problems related to communication issues, and standardization of sampling, analysis and data management methods. This manual addresses those challenges and provides the information and guidance needed to perform the Navruz Project, a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. This manual provides guidelines for participants on sample and data collection, field equipment operations and procedures, sample handling, laboratory analysis, and data management. Also included are descriptions of rivers, sampling sites and parameters on which data are collected. Data obtained in this project are shared among all participating countries and the public through an internet web site, and are available for use in further studies and in regional transboundary water resource management efforts. Overall, the project addresses three main goals: to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and non-proliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources, proliferation concerns, or other factors.

  10. Technical note: A hydrological routing scheme for the Ecosystem Demography model (ED2+R tested in the Tapajós River basin in the Brazilian Amazon

    Directory of Open Access Journals (Sweden)

    F. F. Pereira

    2017-09-01

    Full Text Available Land surface models are excellent tools for studying how climate change and land use affect surface hydrology. However, in order to assess the impacts of Earth processes on river flows, simulated changes in runoff need to be routed through the landscape. In this technical note, we describe the integration of the Ecosystem Demography (ED2 model with a hydrological routing scheme. The purpose of the study was to create a tool capable of incorporating to hydrological predictions the terrestrial ecosystem responses to climate, carbon dioxide, and land-use change, as simulated with terrestrial biosphere models. The resulting ED2+R model calculates the lateral routing of surface and subsurface runoff resulting from the terrestrial biosphere models' vertical water balance in order to determine spatiotemporal patterns of river flows within the simulated region. We evaluated the ED2+R model in the Tapajós, a 476 674 km2 river basin in the southeastern Amazon, Brazil. The results showed that the integration of ED2 with the lateral routing scheme results in an adequate representation (Nash–Sutcliffe efficiency up to 0.76, Kling–Gupta efficiency up to 0.86, Pearson's R up to 0.88, and volume ratio up to 1.06 of daily to decadal river flow dynamics in the Tapajós. These results are a consistent step forward with respect to the no river representation common among terrestrial biosphere models, such as the initial version of ED2.

  11. Tulane/Xavier University hazardous materials in aquatic environments of the Mississippi River Basin. Annual technical report, January 1--December 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-02

    Tulane and Xavier Universities have singled out the environment as a major strategic focus for research and training for now and beyond the year 2000. In 1989, the Tulane/Xavier Center for Bioenvironmental Research (CBR) was established as the umbrella organization which coordinates environmental research at both universities. In December, 1992, the Tulane/Xavier CBR was awarded a five year grant to study pollution in the Mississippi River system. The Hazardous Materials in Aquatic Environments of the Mississippi River Basin project is a broad research and education program aimed at elucidating the nature and magnitude of toxic materials that contaminate aquatic environments of the Mississippi River Basin. Studies include defining the complex interactions that occur during the transport of contaminants, the actual and potential impact on ecological systems and health, and the mechanisms through which these impacts might be remediated. The Mississippi River Basin represents a model system for analyzing and solving contamination problems that are found in aquatic systems world-wide. Summaries which describe objectives, goals, and accomplishments are included on ten collaborative cluster projects, two education projects, and six initiation projects. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  12. International Socio-Technical Challenges for Geological Disposal (InSOTEC): Project Aims and Preliminary Results - 12236

    Energy Technology Data Exchange (ETDEWEB)

    Bergmans, Anne; Schroeder, Jantine [University of Antwerp, Faculty of Political and Social Sciences, 2000 Antwerp (Belgium); Simmons, Peter [University of East Anglia, School of Environmental Sciences, NR4 7TJ Norwich (United Kingdom); Barthe, Yannick; Meyer, Morgan [CNRS, Ecole des Mines, 75272 Paris (France); Sundqvist, Goeran [Universitetet i Oslo, Centre for Studies of Technology, Innovation and Culture, 0851 Oslo (Norway); Martell, Merixell [MERIENCE Strategic Thinking, 08734 Olerdola (Spain); Kallenbach-Herbert, Beate [Oeko Institut, 64295 Darmstadt (Germany)

    2012-07-01

    InSOTEC is a social sciences research project which aims to generate a better understanding of the complex interplay between the technical and the social in radioactive waste management and, in particular, in the design and implementation of geological disposal. It currently investigates and analyses the most striking socio-technical challenges to implementing geological disposal of radioactive waste in 14 national programs. A focus is put on situations and issues where the relationship between the technical and social components is still unstable, ambiguous and controversial, and where negotiations are taking place in terms of problem definitions and preferred solutions. Such negotiations can vary from relatively minor contestation, over mild commotion, to strong and open conflicts. Concrete examples of socio-technical challenges are: the question of siting, introducing the notion of reversibility / retrievability into the concept of geological disposal, or monitoring for confidence building. In a second stage the InSOTEC partners aim to develop a fine-grained understanding of how the technical and the social influence, shape, build upon each other in the case of radioactive waste management and the design and implementation of geological disposal. How are socio-technical combinations in this field translated and materialized into the solutions finally adopted? With what kinds of tools and instruments are they being integrated? Complementary to providing better theoretical insight into these socio-technical challenges/combinations, InSOTEC aims to provide concrete suggestions on how to address these within national and international contexts. To this end, InSOTEC will deliver insights into how mechanisms for interaction between the technical community and a broad range of socio-political actors could be developed. (authors)

  13. Preliminary draft industrial siting administration permit application: Socioeconomic factors technical report. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project in Converse County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Under the with-project scenario, WyCoalGas is projected to make a difference in the long-range future of Converse County. Because of the size of the proposed construction and operations work forces, the projected changes in employment, income, labor force, and population will alter Converse County's economic role in the region. Specifically, as growth occurs, Converse County will begin to satisfy a larger portion of its own higher-ordered demands, those that are currently being satisfied by the economy of Casper. Business-serving and household-serving activities, currently absent, will find the larger income and population base forecast to occur with the WyCoalGas project desirable. Converse County's economy will begin to mature, moving away from strict dependence on extractive industries to a more sophisticated structure that could eventually appeal to national, and certainly, regional markets. The technical demand of the WyCoalGas plant will mean a significant influx of varying occupations and skills. The creation of basic manufacturing, advanced trade and service sectors, and concomitant finance and transportation firms will make Converse County more economically autonomous. The county will also begin to serve market center functions for the smaller counties of eastern Wyoming that currently rely on Casper, Cheyenne or other distant market centers. The projected conditions expected to exist in the absence of the WyCoalGas project, the socioeconomic conditions that would accompany the project, and the differences between the two scenarios are considered. The analysis is keyed to the linkages between Converse County and Natrona County.

  14. Impact assessment and mitigation in existing lake regulation projects in the Oulujoki river system

    International Nuclear Information System (INIS)

    Kaatra, K.; Marttunen, M.

    1993-01-01

    The objective of the project was to determine how regulation practices and shore zone maintenance and improvement should be developed in order to give more attention to recreational requirements and factors affecting the aquatic environment. The proposals must not, however, cause flooding damage or significant energy economy losses. The effects of four alternative regulation practices on hydrology flooding damage, recreational utilization, the aquatic, environment, fisheries and the hydropower production were compared in lakes Oulujaervi, Kiantajaervi, Vuokkijaervi, Ontojaervi and Sotkamonjaervi. An extensive sub-study was made on the maintenance and improvement of the shore zones of the regulated lakes. Ways of reducing excessive vegetation were studied in Lake Oulujaervi, and experiments testing the feasibility of various plants in protecting and landscaping the littoral zone were conducted in Lake Ontojaervi. Enquiries in to the perceptions of and the needs for mitigating harmful impacts, as experienced by the people living within the area affected by the river development projects, were also included in the analysis. The alternative regulation practices for Lake Oulujaervi were compared using the decision analysis interview method, in which the data acquired through the environmental impact analysis of effects were combined with the values of the local people and interest groups. The impact of alternative regulation practices was also weighed from the viewpoint of sustainability in various scales. Recommendations were made for regulation patterns and maintenance and improvement programmes for individual lakes

  15. Assessment of heavy metal concentration in water around the proposed Mkuju river uranium project in Tanzania

    International Nuclear Information System (INIS)

    Banzi, F.P.; Msaki, P.K.; Mohammed, N.K.

    2015-01-01

    Effective verification for compliance with water quality standards in uranium mining in Tanzania requires data sensitive to monitor heavy metal concentration in water around the Mkuju River Uranium Project before mining commences. The area susceptible for pollution by the project was estimated using AERMOD dispersion model and found to cover about 1300 km"2. Thirty one surface and groundwater samples were collected and analysed for heavy metals and physicochemical properties using ICP-MS and standards techniques, respectively. The physicochemical properties for water samples analysed ranges from 5.7 to 7.8 for pH, 2.8 to 80.2 mg/L for TDS and 15 to 534.5 mS/cm for EC. These values show that the water in the vicinity of the Mkuju River Uranium Project is normal. The ranges of concentration of heavy metals (µgL"-"1) determined in water ranges were: Al(2 to 9049), Cr(0.2 to 19.96), Mn (0.1 to 1452), Fe(2 to 53890), Co(0.02 to 27.63), Ni(0.2 to 9.7), Cu(2 to 17), Zn(2 to 62.94), As(0.4 to 19.17), Cd(0.02 to 0.14), Pb (0.02 to 78.68), Th (0.002 to 1.73), U(0.002 to 29.76). These values are below the tolerance levels of concentrations set by different International organisations. Therefore heavy metal toxicity in the study area is marginal. The parameters that could serve as baseline data because of their enhanced sensitivity to pollution were (i) concentration of chromium, cobalt, nickel, copper, zinc, arsenic, cadmium and lead in water (ii) pH, TDS and EC for water, (iii) TDS ratio for surface to ground water values and (iv) correlation coefficients between the heavy metals. However, since TDS values are season dependent, this indicator can serve as baseline data when measured during the dry season as was the case in the study. (author)

  16. Monitoring Isotopes in Rivers: Creation of the Global Network of Isotopes in Rivers (GNIR). Results of a Coordinated Research Project 2002-2006

    International Nuclear Information System (INIS)

    2012-03-01

    River runoff plays a key role in human development in all societies through the provision of water for agriculture, industry and domestic use. Although the monitoring of water availability and our understanding of the main hydrological processes at the catchment scale are relatively good, many important aspects, especially those related to the interaction of runoff and groundwater, remain poorly understood. Additionally, the impact of human activities - such as the construction of large reservoirs and diversions, and the redirection of rivers to supply drinking water or water for irrigation or hydropower - are highly relevant and, together with the predicted impact of climate change, are likely to heavily impact local water cycles. The effects of such changes include: limited availability of water; changes in flood or drought frequency; changes in water quality, sediment load and groundwater recharge; and biodiversity loss in riparian environments. Additionally, political disputes may result as water resources become affected in terms of availability and/or quality. In most instances, stable isotopes and other water tracers provide a deeper insight into hydrological processes, especially in aspects related to water pathways, interconnections, transport of water and pollutants, and the transit time of water. To explore the contribution of these techniques in more detail, the IAEA has launched a monitoring programme, the Global Network of Isotopes in Rivers (GNIR), aimed at regular analysis of the isotope composition of runoff in large rivers. This isotope monitoring network complements an earlier precipitation network, the Global Network of Isotopes in Precipitation (GNIP). To prepare for GNIR, the IAEA launched a coordinated research project (CRP) called Design Criteria for a Network to Monitor Isotope Compositions of Runoff in Large Rivers. The main aim of the CRP was to develop a scientific rationale and a protocol for the operation of such a network, as well as

  17. Data summary report on short-term turbidity monitoring of pipeline river crossings in the Moyie River, Boundary County, Idaho: PGT-PG&E Pipeline Expansion Project

    Energy Technology Data Exchange (ETDEWEB)

    Gowdy, M.J.; Smits, M.P.; Wilkey, P.L.; Miller, S.F.

    1994-03-01

    A water-quality monitoring program was implemented for Bechtel Corporation to measure the short-term increases in turbidity in the Moyie River caused by construction activities of the Pacific Gas Transmission-Pacific Gas & Electric Pipeline Expansion Project. Construction of the buried, 42-in.-diameter, steel pipeline, during the summer of 1992, involved eight wet crossings of the Moyie River along the 13-mi section of pipeline immediately south of the Canadian-United States border in Boundary County, Idaho. This report summarizes the sampling and analysis protocol used and gives the results and observations for each of the eight crossings. The data obtained from this monitoring program, in addition to satisfying regulatory requirements for the Pipeline Expansion Project, will contribute to an ongoing long-term study of the Moyie River crossings being performed for the Gas Research Institute by Argonne National Laboratory. The purpose of this document is strictly limited to reporting the results of the monitoring program. Interpretation of the data is not within the scope of this report.

  18. The ICDP Snake River Geothermal Drilling Project: preliminary overview of borehole geophysics

    Science.gov (United States)

    Schmitt, Douglas R.; Liberty, Lee M.; Kessler, James E.; Kuck, Jochem; Kofman, Randolph; Bishop, Ross; Shervais, John W.; Evans, James P.; Champion, Duane E.

    2012-01-01

    Hotspot: The Snake River Geothermal Drilling Project was undertaken to better understand the geothermal systems in three locations across the Snake River Plain with varying geological and hydrological structure. An extensive series of standard and specialized geophysical logs were obtained in each of the wells. Hydrogen-index neutron and γ-γ density logs employing active sources were deployed through the drill string, and although not fully calibrated for such a situation do provide semi-quantitative information related to the ‘stratigraphy’ of the basalt flows and on the existence of alteration minerals. Electrical resistivity logs highlight the existence of some fracture and mineralized zones. Magnetic susceptibility together with the vector magnetic field measurements display substantial variations that, in combination with laboratory measurements, may provide a tool for tracking magnetic field reversals along the borehole. Full waveform sonic logs highlight the variations in compressional and shear velocity along the borehole. These, together with the high resolution borehole seismic measurements display changes with depth that are not yet understood. The borehole seismic measurements indicate that seismic arrivals are obtained at depth in the formations and that strong seismic reflections are produced at lithological contacts seen in the corresponding core logging. Finally, oriented ultrasonic borehole televiewer images were obtained over most of the wells and these correlate well with the nearly 6 km of core obtained. This good image log to core correlations, particularly with regards to drilling induced breakouts and tensile borehole and core fractures will allow for confident estimates of stress directions and or placing constraints on stress magnitudes. Such correlations will be used to orient in core orientation giving information useful in hydrological assessments, paleomagnetic dating, and structural volcanology.

  19. Project consistency with transportation plans and air quality conformity workshops : technical report.

    Science.gov (United States)

    2015-04-01

    This implementation project supports streamlined project delivery, one of the goals outlined by the Texas : Department of Transportation (TxDOT) leadership to achieve an efficient and effective transportation system : in Texas. The project benefits T...

  20. Anacostia River fringe wetlands restoration project: final report for the five-year monitoring program (2003 through 2007)

    Science.gov (United States)

    Krafft, Cairn C.; Hammerschlag, Richard S.; Guntenspergen, Glenn R.

    2009-01-01

    The 6-hectare (ha) freshwater tidal Anacostia River Fringe Wetlands (Fringe Wetlands) were reconstructed along the mainstem of the Anacostia River in Washington, DC (Photograph 1, Figure 1) during the summer of 2003. The Fringe Wetlands consist of two separate planting cells. Fringe A, located adjacent to Lower Kingman Island, on the west bank of the Anacostia River, occupies 1.6 ha; Fringe B, located on the east bank of the Anacostia River, occupies 4.4 ha. This project is the third in a series of freshwater tidal wetland reconstructions on the Anacostia River designed and implemented by the US Army Corps of Engineers (USACE) Baltimore District and District Department of the Environment (DDOE) on lands managed by the National Park Service (NPS). The first was Kenilworth Marsh, reconstructed in 1993 (Syphax and Hammerschlag 2005); the second was Kingman Marsh, reconstructed in 2000 (Hammerschlag et al. 2006). Kenilworth and Kingman were both constructed in low-energy backwaters of the Anacostia. However, the Fringe Wetlands, which were constructed on two pre-existing benches along the high-energy mainstem, required sheet piling to provide protection from erosive impacts of increased flow and volume of water associated with storm events during the establishment phase (Photograph 2). All three projects required the placement of dredged sediment materials to increase elevations enough to support emergent vegetation (Photograph 3). The purpose of all three wetland reconstruction projects was to restore pieces of the once extensive tidal freshwater marsh habitat that bordered the Anacostia River historically, prior to the dredge and fill operations and sea wall installation that took place there in the early to mid-1900's (Photograph 4).

  1. Technical background information for the environmental and safety report, Volume 5: the 1977 Clinch River sediment survey - data presentation

    International Nuclear Information System (INIS)

    Oakes, T.W.; Ohnesorge, W.F.; Eldridge, J.S.; Scott, T.G.; Parsons, D.W.; Hubbard, H.M.; Sealand, O.M.; Shank, K.E.; Eyman, L.D.

    1982-11-01

    This study determined the fate and distribution of nuclides in the Clinch River by analyzing selected cores for transuranic radionuclide activity and examined the effect of the altered flow regime in the Clinch River on the distribution of the fission product activity. Cores were collected along the full length of the Clinch River from the WOC outfall (CRM 20.8) to locations in the Tennessee River on either side of the junction of the two rivers. The sampling was concentrated around CRM 20.8 and the proposed CRBR site. An inventory of alpha-emitting radionuclides and gamma-emitting fission products and their lateral and vertical distribution patterns in the Clinch River was established

  2. Addressing the technical capacity constraints on community-based labour intensive road projects - a case study of the Amadiba road project

    CSIR Research Space (South Africa)

    Lachman, A

    2006-09-01

    Full Text Available effect. 3. AIMS AND OBJECTIVE OF THE PAPER The main aim of this paper is to discuss the technical capacity constraints experienced on the Amadiba Road Project and to outline the measures taken to address them. Some of the objectives of this paper... are to: � Highlight the socioeconomic status of the community � Highlight the capacity needed on the project � Discuss some of the capacity building issues � Highlight the current state of the community 4. SOCIOECONOMIC STATUS OF THE AMADIBA...

  3. Savannah River Site waste vitrification projects initiated throughout the United States: Disposal and recycle options

    International Nuclear Information System (INIS)

    Jantzen, C.M.

    2000-01-01

    A vitrification process was developed and successfully implemented by the US Department of Energy's (DOE) Savannah River Site (SRS) and at the West Valley Nuclear Services (WVNS) to convert high-level liquid nuclear wastes (HLLW) to a solid borosilicate glass for safe long term geologic disposal. Over the last decade, SRS has successfully completed two additional vitrification projects to safely dispose of mixed low level wastes (MLLW) (radioactive and hazardous) at the SRS and at the Oak Ridge Reservation (ORR). The SRS, in conjunction with other laboratories, has also demonstrated that vitrification can be used to dispose of a wide variety of MLLW and low-level wastes (LLW) at the SRS, at ORR, at the Los Alamos National Laboratory (LANL), at Rocky Flats (RF), at the Fernald Environmental Management Project (FEMP), and at the Hanford Waste Vitrification Project (HWVP). The SRS, in conjunction with the Electric Power Research Institute and the National Atomic Energy Commission of Argentina (CNEA), have demonstrated that vitrification can also be used to safely dispose of ion-exchange (IEX) resins and sludges from commercial nuclear reactors. In addition, the SRS has successfully demonstrated that numerous wastes declared hazardous by the US Environmental Protection Agency (EPA) can be vitrified, e.g. mining industry wastes, contaminated harbor sludges, asbestos containing material (ACM), Pb-paint on army tanks and bridges. Once these EPA hazardous wastes are vitrified, the waste glass is rendered non-hazardous allowing these materials to be recycled as glassphalt (glass impregnated asphalt for roads and runways), roofing shingles, glasscrete (glass used as aggregate in concrete), or other uses. Glass is also being used as a medium to transport SRS americium (Am) and curium (Cm) to the Oak Ridge Reservation (ORR) for recycle in the ORR medical source program and use in smoke detectors at an estimated value of $1.5 billion to the general public

  4. Coeur d’Alene Tribe Benewah Market Energy Efficiency Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Allgood, Tiffany [Coeur d' Alene Tribe, Plummer, ID (United States). Environmental Programs Office, Natural Resources Dept.; Alexie, James [Coeur d' Alene Tribe, Plummer, ID (United States); Nomee, Alfred [Coeur d' Alene Tribe, Plummer, ID (United States)

    2017-12-27

    The Coeur d’Alene Reservation has been the home of the Coeur d’Alene Tribe since time immemorial and it is fitting that the Tribe’s name in the Coeur d’Alene language is schitsu’umsh, “the ones who were found here.” The Reservation is located in northern Idaho, is approximately 345,000 acres and is comprised of forest land, agricultural land, several streams, Coeur d’Alene Lake and the St. Joe River and a small amount of developed land. The project area was conducted within the boundaries of the Coeur d’Alene Reservation. The population of the Reservation is 6,760 (2010 Census). Currently, there are approximately 2,463 enrolled Coeur d’Alene Tribal members (Coeur d’Alene Tribe Enrollment 2016). The Benewah Market is a Tribally-owned and operated facility located at 1111 B St. Plummer, ID 83851. The Benewah Market is an approximately 23,500 square foot single-story structure. The majority of the building is occupied by a grocery store with a full meat department, deli, and bakery. Approximately 20% of the floor area at the northeast corner is occupied by an Ace Hardware retailer. The largest part of the building is approximately 17,000 square feet, is separately metered and houses the grocery store which was constructed in 1984. The market is the largest full service market serving the Coeur d’Alene Reservation and is the only full service market in a 35-mile radius. The Tribe has benefited greatly from the Benewah Market Energy Efficiency Project and will continue to do so for many years: The health and safety of the food has been improved greatly now that the refrigeration and freezer cases are at a constant and safe temperature on a monitoring and alarm system. There is no longer a thaw and freeze cycle that allows fluctuations in temperature. If the power goes out, there is an immediate alarm and contact so that time may be tracked and food kept safe during an outage. The overall annual energy use in the Benewah Market has dropped by 22

  5. 10 years after the largest river restoration project in Northern Europe

    DEFF Research Database (Denmark)

    Astrup Kristensen, Esben Astrup; Kronvang, B.; Wiberg-Larsen, P.

    2014-01-01

    that erosion and sedimentation have changed the cross-sectional profiles over the last 10 years, resulting in a net input of sediment to the lower reaches of the river. However, the change of channel form was a slow process and predicted bank retreat over a 100 year period was only up to 6.8 m. Hence......The lower river Skjern (Denmark) historically contained a large variation in habitats and the river ran through large areas with wetlands, many backwaters, islands and oxbow lakes. During the 1960s the river was channelized and the wetland drained. A restoration during 2001–2002 transformed 19 km...... of channelized river into 26 km meandering river. The short-term effects of this restoration have previously been reported and for this study we revisited the river and with new data evaluated the long-term (10 years) hydrological effects of the restoration. The evaluation was done on three different scales: (1...

  6. Dungeness Crab Dredging Entrainment Studies in the Lower Columbia River, 2002 – 2004: Loss Projections, Salinity Model, and Scenario Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Pearson, Walter H.; Williams, Greg D.; Skalski, John R.

    2005-01-01

    Dungeness crab studies conducted in 2002 for the Portland District of the U.S. Army Corps of Engineers (Corps) constituted a major step forward in quantifying crab entrainment through statistical projections of adult equivalent loss (AEL) and loss to the fishery (LF) from proposed construction and maintenance dredging in the Columbia River navigation channel (Pearson et al. 2002, 2003). These studies also examined the influence of bottom salinity on crab abundance and entrainment rates. Additional sampling was conducted in 2004 to tighten loss projections, further develop the crab salinity model, and apply the model to assess correlations of entrainment rates and projected losses with seasonal salinity changes.

  7. Technical Specifications, South Texas Project, Unit No. 1 (Docket No. 50-498): Appendix ''A'' to License No. NPF-76

    International Nuclear Information System (INIS)

    1988-03-01

    The South Texas Project, Unit No. 1, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR 50 for the protection of the health and safety of the public. This report is Appendix A to License No. NPF-76

  8. The anthropogenic nature of present-day low energy rivers in western France and implications for current restoration projects

    Science.gov (United States)

    Lespez, L.; Viel, V.; Rollet, A. J.; Delahaye, D.

    2015-12-01

    As in other European countries, western France has seen an increase in river restoration projects. In this paper, we examine the restoration goals, methods and objectives with respect to the long-term trajectory and understanding of the contemporary dynamics of the small low energy rivers typical of the lowlands of Western Europe. The exhaustive geomorphological, paleoenvironmental and historical research conducted in the Seulles river basin (Normandy) provides very accurate documentation of the nature and place of the different legacies in the fluvial systems we have inherited. The sedimentation rate in the Seulles valley bottom has multiplied by a factor of 20 since the end of the Bronze Age and has generated dramatic changes in fluvial forms. Hydraulic control of the rivers and valley bottoms drainage throughout the last millennium has channelized rivers within these deposits. The single meandering channel which characterizes this river today is the legacy of the delayed and complex effects of long term exploitation of the river basin and the fluvial system. Bring to light that the "naturalness" of the restored rivers might be questioned. Our research emphasizes the gap between the poor knowledge of the functioning of these rivers and the concrete objectives of the restoration works undertaken, including dam and weir removal. Account of the long-term history of fluvial systems is required, not only to produce a pedagogic history of the "river degradation" but more fundamentally (i) to situate the current functioning of the fluvial system in a trajectory to try to identify thresholds and anticipate the potential turning points in a context of climate and land use change, (ii) to understand the role of morphosedimentary legacies on the current dynamics, (iii) to open the discussion on reference functioning or expected states and (iv) to open discussion on the sustainability of ecological restoration. To conclude, we point out the necessity to take into account the

  9. Report of the first meeting of the Project Advisory Committee (Technical) 21-24 March 1983, at NEMROCK, Cairo

    International Nuclear Information System (INIS)

    Taylor, C.B.G.

    1983-05-01

    The Project Advisory Committee (Technical) (PACT) met on 21-24 March 1983, at NEMROCK, Cairo, Egypt, to discuss the joint IAEA/WHO project on Intracavitary Radiation Therapy for Cancer of the Uterus (Egypt/6/004). At this four day meeting the committee (1) identified a well-defined administrative framework in which earlier diagnosis of uterine cancer may be organized, on a limited but firm basis. (2) Agreed on the clinical and dosimetric principles to be followed in implementing the project. (3) Decided on the types and quantities of equipment which it will need in its first two years. (4) Developed the outline of the syllabus for the first training course, and fixed its date (three weeks from 83-10-29). (5) Reviewed the costs which will be incurred in carrying through the project and found them to be consistent with the funds available

  10. The decommissioning of WWER type nuclear power plants. Final report on an IAEA regional technical co-operation project

    International Nuclear Information System (INIS)

    2000-01-01

    Numerous WWER-440 nuclear power plants are in operation in central and eastern Europe and a small number have already been shut down. In addition to reactors already shut down, many other reactors will reach the end of their design lifetime in a few years and become candidates for decommissioning. It is unfortunate that little consideration was devoted to decommissioning of WWER-440 reactors at the plant design and construction stage, and little emphasis was placed on planning for decommissioning. It is within this context that the IAEA launched a regional technical co-operation project in 1994 with the aim of providing guidance on planning and management of decommissioning for WWERs. The project, which had a duration of four years (1995-1998), included the organization of workshops and scientific visits to countries having WWERs and other countries where active decommissioning projects were under way. Eventually, participants suggested the consolidation of expert guidance and collective opinions into a TECDOC, which was drafted by both designated participants from project recipient countries and invited experts. The TECDOC has the aim of serving as a stimulus for all concerned parties in central and eastern European countries to initiate concrete decommissioning planning, including assessment of existing and required resources for the eventual implementation of decommissioning plans. In addition, the regional technical co-operation project has managed to bring together in this TECDOC a number of good practices that could be useful in WWER-440 decommissioning

  11. Bioremediation of mixed microbial mats: System development of mixed contaminants for application at the Savannah River Site. Annual technical progress report, October 1, 1995--September 30, 1996

    International Nuclear Information System (INIS)

    Bender, J.; Phillips, P.

    1996-01-01

    The fundamental objective of this project is to develop and field test the mixed microbial mat bioremediation system for decontamination of target sites at SRS. Although microbial mats have performed well in several pilot projects in the past, atypical problems and site characteristics at SRS demand special field designs. In the interest of designing a pilot and locating it at an appropriate site, the project investigators have worked closely with the technical staff at the SREL. We have concluded that the diverse characteristics of contaminations at SRS may dictate testing several pilot designs during the course of this project

  12. Management of technical documents: a projection at the University of Zulia

    Directory of Open Access Journals (Sweden)

    Ana Judith Paredes Chacin

    2015-11-01

    Full Text Available Objective. This paper analyze comprehensively and systematically the principles of organization and technical procedure, which support document management based on the use of information technologies. Method. We developed a study based on the documentary descriptive method in the context of the Dirección de Infraestructura (Dinfra from the Universidad del Zulia. Results. We find evidence of efficiency in the processes that support the management of technical documents: Plans, metrics and memories generated by the Dinfra. Conclusion. The conceptual basis of organizational and technical archives contribute to the systematization, shelter save and documental preservation, and ensure the timely retrieval of technical information for the management of the University of Zulia.

  13. Next Generation Nuclear Plant Project Technology Development Roadmaps: The Technical Path Forward

    Energy Technology Data Exchange (ETDEWEB)

    John Collins

    2009-01-01

    This document presents the Next Generation Nuclear Plant (NGNP) Systems, Subsystems, and Components, establishes a baseline for the current technology readiness status, and provides a path forward to achieve increasing levels of technical maturity.

  14. 76 FR 35864 - Proposed Priority; Special Demonstration Programs-National Technical Assistance Projects To...

    Science.gov (United States)

    2011-06-20

    ... have national significance and improve the performance of State vocational rehabilitation (VR) agencies... Centers, the American Indian Vocational Rehabilitation Technical Assistance Center, and the Independent... of each priority as absolute, competitive preference, or invitational through a notice in the Federal...

  15. The Importance of Detail and Organization of Technical Drawings for the Project Management

    Directory of Open Access Journals (Sweden)

    Diego de Avila

    2015-11-01

    Full Text Available This research takes into account the process of technical improvement through the development and interpretation of technical drawing with the appropriate software. However, it’s known that the technical design, no longer being new in business, tends to effect the production process in a clear and objective way, but there is a concern for the training and use of this standardized form tool. This article presents a case study detailing the use of standardized technical