WorldWideScience

Sample records for river hydro graphic

  1. Morphometric and hydro graphic analysis in the hydro graphic basin of the Salsa river in Paraiba South coast of Brasil

    International Nuclear Information System (INIS)

    Barbosa, M.; Nascimento, J.; Furrier, M.

    2010-01-01

    This paper aims to extend the knowledge on the geomorphology of the river basin Salsa, located in the town of Con de, Paraiba / Brasil. The purpose of the research was to develop thematic maps and get related morphometric data to evaluate possible influences on tectonics. Were used Map data and satellite photos which allowed morphological and clinograficos analyze

  2. Morphometric and hydro graphic analysis in the hydro graphic basin of the Salsa river in Paraiba South coast of Brasil; Analisis morfometrico y geomorfologico de la cuenca hidrografica del Rio Salsa en la costa Sur del Estado de Paraiba. Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Barbosa, M.; Nascimento, J.; Furrier, M., E-mail: mariaemanuellaf@gmail.com [Departamento de Geociencias, CCEN, UFPB(Brazil)

    2010-05-15

    This paper aims to extend the knowledge on the geomorphology of the river basin Salsa, located in the town of Con de, Paraiba / Brasil. The purpose of the research was to develop thematic maps and get related morphometric data to evaluate possible influences on tectonics. Were used Map data and satellite photos which allowed morphological and clinograficos analyze.

  3. Hydro energetic inventory study from Chapecozinho river

    International Nuclear Information System (INIS)

    Pimenta, S.C.; Sureck, M.A.A.; Nascimento, P.R.; Kawasaki, M.; Silva Felipe, R. da.

    1990-01-01

    The Hydro energetic Inventory Study in Chapecozinho River Basin, Brazil is described, comparing the proposed results in 1979 with the actual review in 1989. An analysis for solution the socio-economic and environment problems is also presented. (author)

  4. Dynamic hydro-climatic networks in pristine and regulated rivers

    Science.gov (United States)

    Botter, G.; Basso, S.; Lazzaro, G.; Doulatyari, B.; Biswal, B.; Schirmer, M.; Rinaldo, A.

    2014-12-01

    Flow patterns observed at-a-station are the dynamical byproduct of a cascade of processes involving different compartments of the hydro-climatic network (e.g., climate, rainfall, soil, vegetation) that regulates the transformation of rainfall into streamflows. In complex branching rivers, flow regimes result from the heterogeneous arrangement around the stream network of multiple hydrologic cascades that simultaneously occur within distinct contributing areas. As such, flow regimes are seen as the integrated output of a complex "network of networks", which can be properly characterized by its degree of temporal variability and spatial heterogeneity. Hydrologic networks that generate river flow regimes are dynamic in nature. In pristine rivers, the time-variance naturally emerges at multiple timescales from climate variability (namely, seasonality and inter-annual fluctuations), implying that the magnitude (and the features) of the water flow between two nodes may be highly variable across different seasons and years. Conversely, the spatial distribution of river flow regimes within pristine rivers involves scale-dependent transport features, as well as regional climatic and soil use gradients, which in small and meso-scale catchments (A guarantee quite uniform flow regimes and high spatial correlations. Human-impacted rivers, instead, constitute hybrid networks where observed spatio-temporal patterns are dominated by anthropogenic shifts, such as landscape alterations and river regulation. In regulated rivers, the magnitude and the features of water flows from node to node may change significantly through time due to damming and withdrawals. However, regulation may impact river regimes in a spatially heterogeneous manner (e.g. in localized river reaches), with a significant decrease of spatial correlations and network connectivity. Provided that the spatial and temporal dynamics of flow regimes in complex rivers may strongly impact important biotic processes

  5. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  6. Methodology for the selection of alternatives to the waterfall division of hydro graphical basin, considering environmental impacts

    International Nuclear Information System (INIS)

    Cunha, S.H.F. da; Pires, S.H.; Rovere, E.L. La; Pereira, M.V.F.

    1993-01-01

    This paper presents the many stages of a new methodology propose to selection of alternatives of waterfall division of hydro graphical basin considering environmental impacts. The methodology uses the techniques of hierarchical analysis in evaluation of environmental impacts, simulation the individualized power plants in energy evaluation and multi-objective analysis in selection of better alternative of division of basin waterfall. The methodology still foresee moments and mechanisms to take into account the opinion of different social sectors. (C.M.)

  7. 'Matka 2' Hydroelectric Power Plant slip in the chain hydro energetic objects of the Treska River

    International Nuclear Information System (INIS)

    Danevski, Stavre

    2004-01-01

    The paper deals with the project for rational use of the Treska River. The concept of this project is utilization of the hydro-power potential of the Treska River through the subsystem 'Kozjak-Matka' which encompasses realization of three cascade hydroelectric power plants. The proposed and accepted design concepts of the machine hall and plant facilities in HPP 'St. Petka' (formerly named HPP Matka 2) are presented

  8. A Novel Hydro-information System for Improving National Weather Service River Forecast System

    Science.gov (United States)

    Nan, Z.; Wang, S.; Liang, X.; Adams, T. E.; Teng, W. L.; Liang, Y.

    2009-12-01

    A novel hydro-information system has been developed to improve the forecast accuracy of the NOAA National Weather Service River Forecast System (NWSRFS). An MKF-based (Multiscale Kalman Filter) spatial data assimilation framework, together with the NOAH land surface model, is employed in our system to assimilate satellite surface soil moisture data to yield improved evapotranspiration. The latter are then integrated into the distributed version of the NWSRFS to improve its forecasting skills, especially for droughts, but also for disaster management in general. Our system supports an automated flow into the NWSRFS of daily satellite surface soil moisture data, derived from the TRMM Microwave Imager (TMI) and Advanced Microwave Scanning Radiometer-Earth Observing System (AMSR-E), and the forcing information of the North American Land Data Assimilation System (NLDAS). All data are custom processed, archived, and supported by the NASA Goddard Earth Sciences Data Information and Services Center (GES DISC). An optional data fusing component is available in our system, which fuses NEXRAD Stage III precipitation data with the NLDAS precipitation data, using the MKF-based framework, to provide improved precipitation inputs. Our system employs a plug-in, structured framework and has a user-friendly, graphical interface, which can display, in real-time, the spatial distributions of assimilated state variables and other model-simulated information, as well as their behaviors in time series. The interface can also display watershed maps, as a result of the integration of the QGIS library into our system. Extendibility and flexibility of our system are achieved through the plug-in design and by an extensive use of XML-based configuration files. Furthermore, our system can be extended to support multiple land surface models and multiple data assimilation schemes, which would further increase its capabilities. Testing of the integration of the current system into the NWSRFS is

  9. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  10. 77 FR 34371 - Red River Hydro LLC; Notice of Application Tendered for Filing With the Commission and...

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13160-004] Red River Hydro... the river. The existing Overton dam is a concrete gravity structure that is 104 feet in height and 914... feet wide by 685 feet long. The purpose of the lock and dam system is navigation and not storage. The...

  11. Optimizing Dredge-and-Dump Activities for River Navigability Using a Hydro-Morphodynamic Model

    Directory of Open Access Journals (Sweden)

    Andries J. Paarlberg

    2015-07-01

    Full Text Available Worldwide, significant dredging activities of riverbed sediment are employed to ensure that freight transportation on rivers can continue year-round. Imbalances of sediment budget may produce relevant impacts regarding river morphology and related environmental services. This study shows that hydro-morphodynamic modeling tools can be used to optimize dredge-and-dump activities and, at the same time, mitigate problems deriving from these activities in rivers. As a case study, we focused on dredging activities on the Lower Parana River, Argentina. Navigation on this river is of crucial importance to the economies of the bordering countries, hence, each year significant dredging activities are employed. To estimate dredging loads under different strategies, a 25 km river reach of the Parana River was modeled using the Delft3D-modelling suite by Deltares. The Netherlands, to simulate flow-sediment interactions in a quasi-steady and uncoupled approach. Impacts of dredging activities were explicitly included. Different dredge-and-dump strategies included variations in dredging over-depth (clearance and variations in dumping locations. Our results indicate that dredge-and-dump strategies can be targeted to stimulate natural processes that improve the depth and stability of the navigation channel and to counteract unwanted bed level responses in the long-medium term. A ~40% reduction in dredging effort could be achieved by moving the dredged material to distant locations in the secondary channel rather than dumping to the side of the waterway in the main channel.

  12. Analysis of temporal and spatial trends of hydro-climatic variables in the Wei River Basin.

    Science.gov (United States)

    Zhao, Jing; Huang, Qiang; Chang, Jianxia; Liu, Dengfeng; Huang, Shengzhi; Shi, Xiaoyu

    2015-05-01

    The Wei River is the largest tributary of the Yellow River in China. The relationship between runoff and precipitation in the Wei River Basin has been changed due to the changing climate and increasingly intensified human activities. In this paper, we determine abrupt changes in hydro-climatic variables and identify the main driving factors for the changes in the Wei River Basin. The nature of the changes is analysed based on data collected at twenty-one weather stations and five hydrological stations in the period of 1960-2010. The sequential Mann-Kendall test analysis is used to capture temporal trends and abrupt changes in the five sub-catchments of the Wei River Basin. A non-parametric trend test at the basin scale for annual data shows a decreasing trend of precipitation and runoff over the past fifty-one years. The temperature exhibits an increase trend in the entire period. The potential evaporation was calculated based on the Penman-Monteith equation, presenting an increasing trend of evaporation since 1990. The stations with a significant decreasing trend in annual runoff mainly are located in the west of the Wei River primarily interfered by human activities. Regression analysis indicates that human activity was possibly the main cause of the decline of runoff after 1970. Copyright © 2015. Published by Elsevier Inc.

  13. 76 FR 49462 - Red River Hydro LLC; Notice of Application Tendered For Filing With the Commission and...

    Science.gov (United States)

    2011-08-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13160-002] Red River Hydro... concrete gravity structure that is 104 feet in height and 914 feet in length. The spillway consists of five... lock and dam system is navigation and not storage. The upper pool above the dam is commonly referred to...

  14. 77 FR 99 - Barren River Lake Hydro LLC; Notice of Application Tendered for Filing With the Commission...

    Science.gov (United States)

    2012-01-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13022-003] Barren River Lake Hydro LLC; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, and Establishing Procedural Schedule for Licensing and a Deadline for Submission of Final Amendments Take notice that the following...

  15. Spatiotemporal analysis of hydro-meteorological drought in the Johor River Basin, Malaysia

    Science.gov (United States)

    Tan, Mou Leong; Chua, Vivien P.; Li, Cheng; Brindha, K.

    2018-02-01

    Assessment of historical hydro-meteorological drought is important to develop a robust drought monitoring and prediction system. This study aims to assess the historical hydro-meteorological drought of the Johor River Basin (JRB) from 1975 to 2010, an important basin for the population of southern Peninsular Malaysia and Singapore. The Standardized Precipitation Index (SPI) and Standardized Streamflow Index (SSI) were selected to represent the meteorological and hydrological droughts, respectively. Four absolute homogeneity tests were used to assess the rainfall data from 20 stations, and two stations were flagged by these tests. Results indicate the SPI duration to be comparatively low (3 months), and drier conditions occur over the upper JRB. The annual SSI had a strong decreasing trend at 95% significance level, showing that human activities such as reservoir construction and agriculture (oil palm) have a major influence on streamflow in the middle and lower basin. In addition, moderate response rate of SSI to SPI was found, indicating that hydrological drought could also have occurred in normal climate condition. Generally, the El Niño-Southern Oscillation and Madden Julian Oscillation have greater impacts on drought events in the basin. Findings of this study could be beneficial for future drought projection and water resources management.

  16. Development of a hydro kinetic river turbine with simulation and operational measurement results in comparison

    International Nuclear Information System (INIS)

    Ruopp, A; Ruprecht, A; Riedelbauch, S; Arnaud, G; Hamad, I

    2014-01-01

    The development of a hydro-kinetic prototype was shown including the compound structure, guide vanes, runner blades and a draft tube section with a steeply sloping, short spoiler. The design process of the hydrodynamic layout was split into three major steps. First the compound and the draft tube section was designed and the best operating point was identified using porous media as replacement for the guide vane and runner section (step one). The best operating point and the volume flux as well as the pressure drop was identified and used for the design of the guide vane section and the runner section. Both were designed and simulated independently (step two). In step three, all parts were merged in stationary simulation runs detecting peak power and operational bandwidth. In addition, the full scale demonstrator was installed in August 2010 and measured in the St. Lawrence River in Quebec supporting the average inflow velocity using ADCP (Acoustic Doppler Current Profiler) and the generator power output over the variable rotational speed. Simulation data and measurements are in good agreement. Thus, the presented approach is a suitable way in designing a hydro kinetic turbine

  17. Hydro-geomorphological characterization and classification of Chilean river networks using horizontal, vertical and climatological properties

    Science.gov (United States)

    Pereira, A. A.; Gironas, J. A.; Passalacqua, P.; Mejia, A.; Niemann, J. D.

    2017-12-01

    Previous work has shown that lithological, tectonic and climatic processes have a major influence in shaping the geomorphology of river networks. Accordingly, quantitative classification methods have been developed to identify and characterize network types (dendritic, parallel, pinnate, rectangular and trellis) based solely on the self-affinity of their planform properties, computed from available Digital Elevation Model (DEM) data. In contrast, this research aim is to include both horizontal and vertical properties to evaluate a quantitative classification method for river networks. We include vertical properties to consider the unique surficial conditions (e.g., large and steep height drops, volcanic activity, and complexity of stream networks) of the Andes Mountains. Furthermore, the goal of the research is also to explain the implications and possible relations between the hydro-geomorphological properties and climatic conditions. The classification method is applied to 42 basins in the southern Andes in Chile, ranging in size from 208 Km2 to 8,000 Km2. The planform metrics include the incremental drainage area, stream course irregularity and junction angles, while the vertical metrics include the hypsometric curve and the slope-area relationship. We introduce new network structures (Brush, Funnel and Low Sinuosity Rectangular), possibly unique to the Andes, that can be quantitatively differentiated from previous networks identified in other geographic regions. Then, this research evaluates the effect that excluding different Strahler order streams has on the horizontal properties and therefore in the classification. We found that climatic conditions are not only linked to horizontal parameters, but also to vertical ones, finding significant correlation between climatic variables (average near-surface temperature and rainfall) and vertical measures (parameters associated with the hypsometric curve and slope-area relation). The proposed classification shows

  18. 76 FR 75543 - Missisquoi River Technologies; Missisquoi River Hydro LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2011-12-02

    ..., Missisquoi River Technologies informed the Commission that its exemption from licensing for the North Troy..., located at 453 East Hill Rd., Middlesex, VT 05602, is now the exemptee of the North Troy Hydroelectric...

  19. Flow status of three transboundary rivers in Northern Greece as a tool for hydro-diplomacy

    Science.gov (United States)

    Hatzigiannakis, Eyaggelos; Hatzispiroglou, Ioannis; Arampatzis, Georgios; Ilia, Andreas; Pantelakis, Dimitrios; Filintas, Agathos; Panagopoulos, Andreas

    2015-04-01

    The aim of this paper is to examine how the river flow monitoring consists a tool for hydro-diplomacy. Management of transboundary catchments and the demand of common water resources, often comprise the cause of conflicts and tension threatening the peaceful coexistence of nations. The Water Framework Directive 2000/60/EU sets a base for water management contributing to common approaches, common goals, common principles as well as providing new definitions and measures for Europe's water resources. In northern Greece the main renewable resources are "imported" (over 25% of its water reserves) and for this reason the implementation of continuous flow measurements throughout the year is necessary, even though difficult to achieve. This paper focuses on the three largest transboundary rivers in Northern Greece. Axios and Strymonas river flow across the region of Central Macedonia in Northern Greece. Axios flows from FYROM to Greece, and Strymonas from Bulgaria to Greece. Nestos river flows from Bulgaria to Greece. The Greek part is in the region of Eastern Macedonia and Thrace in Northern Greece. Significant productive agricultural areas around these rivers are irrigated from them so they are very important for the local society. Measurements of the river flow velocity and the flow depth have been made at bridges. The frequency of the measurements is roughly monthly, because it is expected a significant change in the depth flow and discharge. A series of continuously flow measure-ments were performed during 2013 and 2014 using flowmeters (Valeport and OTT type). The cross-section characteristics, the river flow velocity of segments and the mean water flow velocity and discharge total profile were measured and calculated re-spectively. Measurements are conducted in the framework of the national water resources monitoring network, which is realised in compliance to the Water Framework Directive under the supervision and coordination of the Hellenic Ministry for the

  20. Perspectives on Hydro-Climatic Change in Rivers Sourced From the Khangai Mountains, Mongolia

    Science.gov (United States)

    Venable, N. B.; Fassnacht, S. R.; Tumenjargal, S.; Batbuyan, B.; Odgarav, J.; Sukhbataar, J.; Fernandez-Gimenez, M.; Adyabadam, G.

    2012-12-01

    Patterns of pastoralism have shaped the Mongolian countryside throughout history. These patterns are largely dictated by seasonal and extreme climate and water conditions. While change has always been a part of the traditional herder lifestyle, the magnitude and variety of impacts imposed by natural and human-induced changes in the last few decades has increased, negatively affecting the coupled natural-human systems of Mongolia. Regional hydrologic impacts from increased mining, irrigation, urbanization, and climate change are challenging to measure and model due to sparse and relatively short meteorological and hydrological records. Characterization of the variability inherent in Mongolian hydrological systems in the international literature remains limited. To quantify recent changes to these systems, several river basins near the Khangai Mountains were analyzed. These basins adjoin and include community-based managed and non-managed grazing lands under study as part of an ongoing National Science Foundation Coupled Natural and Human Systems (NSF-CNH) project. Statistically significant increasing temperatures and decreasing streamflows in the study areas support herder's perceptions of hydro-climatic changes and variability. The results of basin characterization combined with water balance modeling and trend analyses illustrate the future potential for further change in these hydro-climatic systems. Alternate land-uses and herder lifestyle modifications may amplify impacts from climatic change. Recent fieldwork also revealed complex surface-groundwater interactions in some areas that may affect model outcomes. Future explorations of longer-term variability through the use of proxies and the development of hydrologic scenarios will place the current basin analyses in context to more fully assess possible impacts to the hydrologic-human systems of Mongolia.

  1. Integrated Hydro-geomorphological Monitoring System of the Upper Bussento river basin (Cilento and Vallo Diano Geopark, S-Italy)

    Science.gov (United States)

    Guida, D.; Cuomo, A.; Longobardi, A.; Villani, P.; Guida, M.; Guadagnuolo, D.; Cestari, A.; Siervo, V.; Benevento, G.; Sorvino, S.; Doto, R.; Verrone, M.; De Vita, A.; Aloia, A.; Positano, P.

    2012-04-01

    The Mediterranean river ecosystem functionings are supported by river-aquifer interactions. The assessment of their ecological services requires interdisciplinary scientific approaches, integrate monitoring systems and inter-institutional planning and management. This poster illustrates the Hydro-geomorphological Monitoring System build-up in the Upper Bussento river basin by the University of Salerno, in agreement with the local Basin Autorities and in extension to the other river basins located in the Cilento and Vallo Diano National Park (southern Italy), recently accepted in the European Geopark Network. The Monitoring System is based on a hierarchical Hydro-geomorphological Model (HGM), improved in a multiscale, nested and object-oriented Hydro-geomorphological Informative System (HGIS, Figure 1). Hydro-objects are topologically linked and functionally bounded by Hydro-elements at various levels of homogeneity (Table 1). Spatial Hydro-geomorpho-system, HG-complex and HG-unit support respectively areal Hydro-objects, as basin, sector and catchment and linear Hydro-objects, as river, segment, reach and section. Runoff initiation points, springs, disappearing points, junctions, gaining and water losing points complete the Hydro-systems. An automatic procedure use the Pfafstetter coding to hierarchically divide a terrain into arbitrarily small hydro-geomorphological units (basin, interfluve, headwater and no-contribution areas, each with a unique label with hierarchical topological properties. To obtain a hierarchy of hydro-geomorphological units, the method is then applied recursively on each basin and interbasin, and labels of the subdivided regions are appended to the existing label of the original region. The monitoring stations are ranked consequently in main, secondary, temporary and random and located progressively at the points or sections representative for the hydro-geomorphological responses by validation control and modeling calibration. The datasets

  2. People's perception on impacts of hydro-power projects in Bhagirathi river valley, India.

    Science.gov (United States)

    Negi, G C S; Punetha, Disha

    2017-04-01

    The people's perception on environmental and socio-economic impacts due to three hydro-electric projects (HEPs; commissioned and under construction) were studied in the north-west Indian Himalaya. Surveys among 140 project-affected people (PAPs) using a checklist of impacts indicate that among the negative impacts, decrease in flora/fauna, agriculture, flow of river, aesthetic beauty; and increase in water pollution, river bed quarrying for sand/stone, human settlement on river banks and social evils; and among the positive impacts, increase in standard of living, road connectivity, means of transport, public amenities, tourism and environmental awareness were related with HEPs. The PAPs tend to forget the negative impacts with the age of the HEPs after it becomes functional, and the positive impacts seem to outweigh the negative impacts. Study concludes that it is difficult to separate the compounding impacts due to HEP construction and other anthropogenic and natural factors, and in the absence of cause-and-effect analyses, it is hard to dispel the prevailing notion that HEPs are undesirable in the study area that led to agitations by the environmentalists and stopped construction of one of these HEPs. To overcome the situation, multi-disciplinary scientific studies involving the PAPs need to be carried out in planning and decision-making to make HEPs environment friendly and sustainable in this region. There is also a need to adopt low carbon electric power technologies and promote a decentralized energy strategy through joint ventures between public and private companies utilizing locally available renewable energy resources.

  3. [Temporal-spatial Variation and Source Identification of Hydro-chemical Characteristics in Shima River Catchment, Dongguan City].

    Science.gov (United States)

    Gao, Lei; Chen, Jian-yao; Wang, Jiang; Ke, Zhi-ting; Zhu, Ai-ping; Xu, Kai

    2015-05-01

    Shima River catchment is of strategic importance to urban water supply in Dongjiang portable water source area. To investigate the hydro-chemical characteristics of Shima River, 39 river water samples were collected in February, June and November, 2012 to analyze the major ions (K+, Na+, Ca2+, Mg2+, Cl-, SO4(2-) , HCO3-) and nutritive salts (PO4(3-), NO3- and NH4+) and to discuss the temporal-spatial variation and controlling factors of hydro-chemical composition, relative sources identification of varied ions was performed as well. The results showed that the hydro-chemical composition exhibited significant differences in different periods. The average concentration of total dissolved solid ( TDS) and nutritive salts in different investigated periods followed the decreasing order of November > February > June. The dominant anion of Shima River was HCO3-, and Na+ + K+ were the major cations in February and November which were changed to Ca2+ in June, the hydro-chemical types were determined as HCO(3-)-Na+ and HCO(3-)- Ca2+ in dry (February and November) and rainy (June) seasons, respectively. Spatial variations of concentration of nutritive salts were mainly affected by the discharges of N- and P-containing waste water resulted from human activities. The ratio between N and P of water sample (R7) was 18.4:1 which boosted the "crazy growth" of phytoplankton and led to severe eutrophication. According to Gibbs distribution of water samples, dissolution of hydatogenic rocks was the primary factor to control the major cations of river water in dry season, however, the hydro-chemical composition was significantly affected by the combination of hydatogenic and carbonate rocks in rainy season. The deposition of sea-salts contributed less to chemical substances in river. Correlation analysis revealed that K+, Na+, Mg2+, Cl- and SO4(2-) were partly derived from the application of fertilizer and the discharge of industrial effluent; Waste water of poultry feeding and

  4. The effects of hydroelectric gates on rivers, hydro-ecological diagnostic and management aid. The Fontauliere example (Ardeche)

    International Nuclear Information System (INIS)

    Valentin, S.

    1996-01-01

    Hydropower generation induces artificial fluctuations of flow and thus of hydrodynamic parameters in rivers, downstream of hydroelectric impoundments. On the Fontauliere river (Ardeche basin, France), the ecological effects of two different hydro-peaking regimes were tested and compared to a reference upstream reach. Fish, invertebrate and epilithic communities were surveyed in these reaches. The results enables to classify the factors responsible for the observed effects. The base flow between peaks was the most important for the studied site. When it was too low, aquatic communities were de-structured in comparison with the natural reach. These results enabled to suggest a current velocity threshold to respect in order to determine acceptable base flow for this type of stream. They also enabled to guide for the impact evaluation of hydro-peaking sites. An ecological diagnosis should include the study of the structure and composition of the communities. (author). 22 refs., 2 figs., 4 tabs

  5. More dams planned for Nitassinan Rivers : Innu Nation backgrounder on the proposed Churchill River hydro projects

    International Nuclear Information System (INIS)

    1999-01-01

    The Labrador Innu have expressed their concerns regarding the proposed development of a huge hydroelectric project for the Nitassinan Rivers. The Innu people were not consulted regarding the negotiations which will take place between Newfoundland and Quebec. The biggest concern of the Innu people is the cumulative environmental and social effects of the proposed development and how it will contribute to opening up their territory to further development. For example, access roads, transmission corridors and large-scale clear-cut forestry operations would all impact on their traditional way of life. This paper also described the impacts that the Innu have already experienced as a result of hydroelectric development on the Nitassinan Rivers during the 1970s, when the government of Newfoundland gave the rights to develop and exploit water resources, forests and minerals to a private company. At that time, large areas of hunting and trapping territories were flooded, belongings were lost and burial sites were flooded. The flooding also resulted in increased levels of methyl mercury in fish in the reservoirs as well as downstream. The losses suffered by the Innu people have yet to be addressed by the governments

  6. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    Science.gov (United States)

    Jidin, Razali; Othman, Bahari

    2013-06-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  7. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    International Nuclear Information System (INIS)

    Jidin, Razali; Othman, Bahari

    2013-01-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  8. Negotiating river ecosystems: Impact assessment and conflict mediation in the cases of hydro-power construction

    International Nuclear Information System (INIS)

    Karjalainen, Timo P.; Jaervikoski, Timo

    2010-01-01

    In this paper we discuss how the legitimacy of the impact assessment process is a key issue in conflict mediation in environmental impact assessment. We contrast two EIA cases in hydro-power generation plans made for the Ii River, Finland in different decades, and evaluate how impact assessment in these cases has contributed to the creation, mediation and resolution of conflicts. We focus on the elements of distributional and procedural justice that made the former EIA process more legitimate and consensual and the latter more conflictual. The results indicate that it is crucial for conflict mediation to include all the values and interests of the parties in the goal-setting process and in the definition and assessment of alternatives. The analysis also indicates that procedural justice is the most important to help the people and groups involved to accept the legitimacy of the impact assessment process: how different parties and their values and interests are recognized, and how participation and distribution of power are organized in an impact assessment process. It is confirmed in this article that SIA may act as a mediator or a forum providing a process through which competing knowledge claims, various values and interests can be discussed and linked to the proposed alternatives and interventions.

  9. Potency of Micro Hydro Power Plant Development Use of Kelampuak River Flow Located in Tamblang Village – Buleleng

    Directory of Open Access Journals (Sweden)

    Dewa Ngakan Ketut Putra Negara

    2012-11-01

    Full Text Available Need of electrical energy is increasing along with people population and economic growth. According to PLN data, Bali Province’s electrical consumption is predicted growth 5,6% in average every year. Until year 2007, electrical condition in Bali is categorized critical. If Power Plat in Bali, PLTG Gilimanuk that has power 130 MW is out of system, affecting Bali’s electrical back up is minus. Consecuenlly, it will be extinguishing if there is not adding power plan or new energy supply. This problem needs to be anticipated by use of thermal energy program such as coal, gas and geothermal and use of alternative energy such as solar, wind and ocean energies. Regency of Buleleng is one of Regency in Bali having potency of renewable energy development especially water resource. It has some rivers that have potency to be developed as a Micro Hydro Power Plant (PLTMH. One of them is Kelampuak River which is located in Tamblang Village. As a first step in developing of Micro Hydro Power Plant, it needs to be known water debit and head of the river. For that reason, it needs to be investigated debit and head of Kelampuak River so that it can be predicted the power can be generated.

  10. Forecasting skills of the ensemble hydro-meteorological system for the Po river floods

    Science.gov (United States)

    Ricciardi, Giuseppe; Montani, Andrea; Paccagnella, Tiziana; Pecora, Silvano; Tonelli, Fabrizio

    2013-04-01

    The Po basin is the largest and most economically important river-basin in Italy. Extreme hydrological events, including floods, flash floods and droughts, are expected to become more severe in the next future due to climate change, and related ground effects are linked both with environmental and social resilience. A Warning Operational Center (WOC) for hydrological event management was created in Emilia Romagna region. In the last years, the WOC faced challenges in legislation, organization, technology and economics, achieving improvements in forecasting skill and information dissemination. Since 2005, an operational forecasting and modelling system for flood modelling and forecasting has been implemented, aimed at supporting and coordinating flood control and emergency management on the whole Po basin. This system, referred to as FEWSPo, has also taken care of environmental aspects of flood forecast. The FEWSPo system has reached a very high level of complexity, due to the combination of three different hydrological-hydraulic chains (HEC-HMS/RAS - MIKE11 NAM/HD, Topkapi/Sobek), with several meteorological inputs (forecasted - COSMOI2, COSMOI7, COSMO-LEPS among others - and observed). In this hydrological and meteorological ensemble the management of the relative predictive uncertainties, which have to be established and communicated to decision makers, is a debated scientific and social challenge. Real time activities face professional, modelling and technological aspects but are also strongly interrelated with organization and human aspects. The authors will report a case study using the operational flood forecast hydro-meteorological ensemble, provided by the MIKE11 chain fed by COSMO_LEPS EQPF. The basic aim of the proposed approach is to analyse limits and opportunities of the long term forecast (with a lead time ranging from 3 to 5 days), for the implementation of low cost actions, also looking for a well informed decision making and the improvement of

  11. Modeling invasive alien plant species in river systems: Interaction with native ecosystem engineers and effects on hydro-morphodynamic processes

    Science.gov (United States)

    van Oorschot, M.; Kleinhans, M. G.; Geerling, G. W.; Egger, G.; Leuven, R. S. E. W.; Middelkoop, H.

    2017-08-01

    Invasive alien plant species negatively impact native plant communities by out-competing species or changing abiotic and biotic conditions in their introduced range. River systems are especially vulnerable to biological invasions, because waterways can function as invasion corridors. Understanding interactions of invasive and native species and their combined effects on river dynamics is essential for developing cost-effective management strategies. However, numerical models for simulating long-term effects of these processes are lacking. This paper investigates how an invasive alien plant species affects native riparian vegetation and hydro-morphodynamics. A morphodynamic model has been coupled to a dynamic vegetation model that predicts establishment, growth and mortality of riparian trees. We introduced an invasive alien species with life-history traits based on Japanese Knotweed (Fallopia japonica), and investigated effects of low- and high propagule pressure on invasion speed, native vegetation and hydro-morphodynamic processes. Results show that high propagule pressure leads to a decline in native species cover due to competition and the creation of unfavorable native colonization sites. With low propagule pressure the invader facilitates native seedling survival by creating favorable hydro-morphodynamic conditions at colonization sites. With high invader abundance, water levels are raised and sediment transport is reduced during the growing season. In winter, when the above-ground invader biomass is gone, results are reversed and the floodplain is more prone to erosion. Invasion effects thus depend on seasonal above- and below ground dynamic vegetation properties and persistence of the invader, on the characteristics of native species it replaces, and the combined interactions with hydro-morphodynamics.

  12. Hydro-politics and conflict resolutions of international rivers lessons from Colorado, Indus, Nile, Jordan, Euphrates, and Danube

    International Nuclear Information System (INIS)

    Murakami, M.

    1997-01-01

    Intensive water development of the large rivers gave a significant influence and / or adverse effects on the water balance and ecosystem not only along the rivers but also in the inland and / or coastal deltas. The very crew concerns might have been paid to solve the increasing potential conflicts and the creeping environmental problems over the international waters, and time is fast running out. This study of hydro-politics and conflict resolutions of international rivers aim to identify the issues in disputes concerning water resources and environment, selected alternative scenarios, and recommended processes throughout which the counties concerned are likely to agree on mutually satisfactory solutions to the problems by sharing resources and benefits. The study will also provide a comprehensive and objective environmental management setting for the sustainable development with or without international co-operation in the perspective of the 21st century by reviewing some lessons from the past. (author)

  13. Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China

    Directory of Open Access Journals (Sweden)

    Xinshuo Zhang

    2018-04-01

    Full Text Available How to effectively use clean renewable energy to improve the capacity of the power grid to absorb new energy and optimize the power grid structure has become one of China’s current issues. The Yalong River Wind-PV-Hydro complementary clean energy base was chosen as the research object from which to analyze the output complementarity principle and characteristics of wind farms, photovoltaic power plants, and hydropower stations. Then, an optimization scheduling model was established with the objective of minimizing the amount of abandoned wind and photovoltaic power and maximizing the stored energy in cascade hydropower stations. A Progress Optimality Algorithm (POA was used for the short-term optimal operation of Wind-PV-Hydro combinations. The results show that use of cascaded hydropower storage capacity can compensate for large-scale wind power and photovoltaic power, provide a relatively sustained and stable power supply for the grid. Wind-PV-Hydro complementary operation not only promotes wind power and photovoltaic power consumption but also improves the efficiency of using the original transmission channel of hydropower. This is of great significance to many developing countries in formatting a new green approach, realizing low-carbon power dispatch and trade and promoting regional economic development.

  14. Joint atmospheric-terrestrial water balances for East Africa: a WRF-Hydro case study for the upper Tana River basin

    Science.gov (United States)

    Kerandi, Noah; Arnault, Joel; Laux, Patrick; Wagner, Sven; Kitheka, Johnson; Kunstmann, Harald

    2018-02-01

    For an improved understanding of the hydrometeorological conditions of the Tana River basin of Kenya, East Africa, its joint atmospheric-terrestrial water balances are investigated. This is achieved through the application of the Weather Research and Forecasting (WRF) and the fully coupled WRF-Hydro modeling system over the Mathioya-Sagana subcatchment (3279 km2) and its surroundings in the upper Tana River basin for 4 years (2011-2014). The model setup consists of an outer domain at 25 km (East Africa) and an inner one at 5-km (Mathioya-Sagana subcatchment) horizontal resolution. The WRF-Hydro inner domain is enhanced with hydrological routing at 500-m horizontal resolution. The results from the fully coupled modeling system are compared to those of the WRF-only model. The coupled WRF-Hydro slightly reduces precipitation, evapotranspiration, and the soil water storage but increases runoff. The total precipitation from March to May and October to December for WRF-only (974 mm/year) and coupled WRF-Hydro (940 mm/year) is closer to that derived from the Climate Hazards Group Infrared Precipitation with Stations (CHIRPS) data (989 mm/year) than from the TRMM (795 mm/year) precipitation product. The coupled WRF-Hydro-accumulated discharge (323 mm/year) is close to that observed (333 mm/year). However, the coupled WRF-Hydro underestimates the observed peak flows registering low but acceptable NSE (0.02) and RSR (0.99) at daily time step. The precipitation recycling and efficiency measures between WRF-only and coupled WRF-Hydro are very close and small. This suggests that most of precipitation in the region comes from moisture advection from the outside of the analysis domain, indicating a minor impact of potential land-precipitation feedback mechanisms in this case. The coupled WRF-Hydro nonetheless serves as a tool in quantifying the atmospheric-terrestrial water balance in this region.

  15. Groundwater denitrification in two agricultural river catchments: influence of hydro-geological setting and aquifer geochemistry

    Science.gov (United States)

    McAleer, Eoin; Mellander, Per-Erik; Coxon, Catherine; Richards, Karl G.; Jahangir, Mohammad M. R.

    2015-04-01

    Identifying subsurface environments with a natural capacity for denitrification is important for improving agricultural management. At the catchment scale, a complex hierarchy of landscape, hydro-geological and physico-chemical characteristics combine to affect the distribution of groundwater nitrate (NO3-). This study was conducted along four instrumented hillslopes in two ca. 10km2 agricultural river catchments in Ireland, one dominated by arable and one by grassland agriculture. Both catchments are characterised by well drained soils, but have differing aquifer characteristics. The arable catchment is underlain by weathered Ordovician slate bedrock which is extensively fractured with depth. The grassland catchment is characterised by Devonian sandstone bedrock, exhibiting both lateral (from upslope to near stream) and vertical variations in permeability along each hillslope. The capacity for groundwater denitrification was assessed by examining the concentration and distribution patterns of N species (total nitrogen, nitrate, nitrite, ammonium), dissolved organic carbon (DOC), dissolved oxygen (DO) and redox potential (Eh) in monthly samples from shallow and deep groundwater piezometers (n=37). Additionally, the gaseous products of denitrification: nitrous oxide (N2O) and excess dinitrogen (excess N2) were measured seasonally using gas chromatography and membrane inlet mass spectroscopy, respectively. The slate catchment was characterised by uniformity, both laterally and vertically, in aquifer geochemistry and gaseous denitrification products. The four year spatial mean groundwater NO3--N concentration was 6.89 mg/l and exhibited low spatial and temporal variability (temporal SD: 1.19 mg/l, spatial SD: 1.185 mg/l). Elevated DO concentrations (mean: 9.75 mg/l) and positive Eh (mean: +176.5mV) at all sample horizons indicated a setting with little denitrification potential. This non-reducing environment was reflected in a low accumulation of denitrification

  16. Issue of ecological impacts due to hydro-peaking management. Characterization of hydro-peaks - Operating experience on Maronne River; Impacts ecologiques des eclusees hydroelectriques. Caracterisaton des regimes d'eclusees et Retour d'experience sur la Maronne

    Energy Technology Data Exchange (ETDEWEB)

    Courret, Dominique; Larinier, Michel [Office National de l' Eau et des Milieux Aquatiques - ONEMA, Pole Ecohydraulique, IMFT, Cemagref, Avenue du Professeur Camille Soula, 31400 Toulouse (France); Chanseau, Matthieu [MIGADO, 18ter rue de la Garonne - 47520 Le Passage (France); Office National de l' Eau et des Milieux Aquatiques - ONEMA, Direction Interregionale de Toulouse, Avenue du Professeur Camille Soula, 31400 Toulouse (France); Lascaux, Jean-Marc [Etudes et COnseils en Gestion de l' Environnement Aquatique - ECOGEA, 10 avenue de Toulouse, 31860 Pins-Justaret (France)

    2012-01-15

    Hydro-peaking management can consistently alter fish populations, and particularly recruitment of diadromous species, like salmon. To progress in understanding the impacts and defining mitigation measures, it appears essential to combine long-term biological survey, hydrological analysis including hydro-peaks characterization, and hydro-morphologic approach. In a first time, a methodology for hydrological characterization of hydro-peaks is presented. Their diversity and high variability are illustrated. Then, we present operating experience on Maronne River, a tributary of the Dordogne River downstream Argentat affected by hydro-peaks of Hautefage scheme. Biological surveys and hydrologic and hydro-morphologic studies allowed a better understanding and a quantification of some biological impacts (redds dewatering, stranding-trapping of alevins), to support mitigation measures and to assess its effectiveness. The relevance of work on morphology, in addition to measures on flow management, is also illustrated. Some positive results have already been obtained. Studies on the Maronne River are pursued to achieve a really satisfactory situation. This example shows that the current knowledge does not allow, on a given stream, to pre-define mitigation measures and ensure their efficiency. This leads to advocate the setting up of similar approach on other river, to identify biological communities' responses depending on the characteristics of hydro-peaks and hydro-systems. (authors)

  17. Complex hydro- and sediment dynamics survey of two critical reaches on the Hungarian part of river Danube

    International Nuclear Information System (INIS)

    Baranya, Sandor; Jozsa, Janos; Goda, Laszlo; Rakoczi, Laszlo

    2008-01-01

    Detailed hydrodynamic survey of two critical river reaches has been performed from hydro- and sediment dynamics points of view, in order to explore the main features, moreover, provide calibration and verification data to related 3D flow and sediment transport modelling. Special attention has been paid to compare moving and fix boat measurement modes for estimating various flow and large-scale bed form features, resulting in recommendations e.g. on the time period needed in stationary mode operation to obtain sufficiently stabilized average velocity profiles and related parameter estimations. As to the study reaches, the first comprises a 5 km long sandy-gravel bed reach of river Danube located in Central-Hungary, presenting problems for navigation. As a conventional remedy, groyne fields have been implemented to make and maintain the reach sufficiently deep, navigable even in low flow periods. As is usually the case, these works resulted in rather complex flow characteristics and related bed topography at places. The second site is another 5 km long reach of river Danube, close to the southern border to Serbia. There the river presents navigational problems similar to the previously mentioned reach, however, having entirely sand bed conditions, abundant in a variety of dunes, especially in the shallower parts. In both study reaches ADCP measurements were done with around 2.5 Hz sampling frequency both in moving boat operation mode providing overall, though locally moderately representative picture, and in fixed boat mode at a considerable number of selected verticals with 10 minutes long measuring time.

  18. Hydro-Economic based Model of Damage and Loss Analysis of Winongo River Flood

    Directory of Open Access Journals (Sweden)

    Muhammad Rifki Hardika

    2017-09-01

    Full Text Available Winongo River experienced considerably high flow that caused overflows along the downstream part of the river and some inundation at the surrounding area. The inundation has reached up to 1 m spread over the Tegalrejo Sub-district of Yogyakarta City and swept two houses. This paper analyses the damage and loss due to the flood by taking into account the hydraulics phenomena and the economic impact at the inundation area. A hydraulics model has been developed to study the flow characteristics during the flood of Winongo River, especially in the river reach in Tegalrejo Sub-district. The hazard-induced damages in the flooded area were identified and the economic impacts were studied. Several related software have been utilized to analyse the damage and loss of the disaster, including the HEC-RAS 5.0, ArcGIS, HEC-GeoRAS and InaSAFE. Through the integration of the characteristics of both flood phenomena and the economic factor, the damage and loss were then analysed and the Average Annual Damage (AAD of approximately IDR 88,750,000,000 was obtained.

  19. Migration of the Ganga river and its implication on hydro-geological ...

    Indian Academy of Sciences (India)

    on extensive field surveys and data collected in boreholes provides new information regarding the. Ganga river valley and aquifer development around. Varanasi. Boreholes drilled within Varanasi city have been analyzed to understand the subsur- face stratigraphic architecture and its significance in groundwater potential.

  20. Impact of river stage prediction methods on stream-aquifer exchanges in a hydro(geo)logical model at the regional scale

    Science.gov (United States)

    Saleh, F.; Flipo, N.; de Fouquet, C.

    2012-04-01

    The main objective of this study is to provide a realistic simulation of river stage in regional river networks in order to improve the quantification of stream-aquifer exchanges and better assess the associated aquifer responses that are often impacted by the magnitude and the frequency of the river stage fluctuations. The study focuses on the Oise basin (17 000 km2, part of the 65 000 km2 Seine basin in Northern France) where stream-aquifer exchanges cannot be assessed directly by experimental methods. Nowadays numerical methods are the most appropriate approaches for assessing stream-aquifer exchanges at this scale. A regional distributed process-based hydro(geo)logical model, Eau-Dyssée, is used, which aims at the integrated modeling of the hydrosystem to manage the various elements involved in the quantitative and qualitative aspects of water resources. Eau-Dyssée simulates pseudo 3D flow in aquifer systems solving the diffusivity equation with a finite difference numerical scheme. River flow is simulated with a Muskingum model. In addition to the in-stream discharge, a river stage estimate is needed to calculate the water exchange at the stream-aquifer interface using the Darcy law. Three methods for assessing in-stream river stages are explored to determine the most appropriate representation at regional scale over 25 years (1980-2005). The first method consists in defining rating curves for each cell of a 1D Saint-Venant hydraulic model. The second method consists in interpolating observed rating curves (at gauging stations) onto the river cells of the hydro(geo)logical model. The interpolation technique is based on geostatistics. The last method assesses river stage using Manning equation with a simplified rectangular cross-section (water depth equals the hydraulic radius). Compared to observations, the geostatistical and the Manning methodologies lead to slightly less accurate (but still acceptable) results offering a low computational cost opportunity

  1. Hydro-Geological Hazard Temporal Evolution during the last seven decades in the Solofrana River Basin—Southern Italy

    Science.gov (United States)

    Longobardi, Antonia; Diodato, Nazzareno; Mobilia, Mirka

    2017-04-01

    Extremes precipitation events are frequently associated to natural disasters falling within the broad spectrum of multiple damaging hydrological events (MDHEs), defined as the simultaneously triggering of different types of phenomena, such as landslides and floods. The power of the rainfall (duration, magnitude, intensity), named storm erosivity, is an important environmental indicator of multiple damaging hydrological phenomena. At the global scale, research interest is actually devoted to the investigation of non-stationary features of extreme events, and consequently of MDHEs, which appear to be increasing in frequency and severity. The Mediterranean basin appears among the most vulnerable regions with an expected increase in occurring damages of about 100% by the end of the century. A high concentration of high magnitude and short duration rainfall events are, in fact, responsible for the largest rainfall erosivity and erosivity density values within Europe. The aim of the reported work is to investigate the relationship between the temporal evolution of severe geomorphological events and combined precipitation indices as a tool to improve understanding the hydro-geological hazard at the catchment scale. The case study is the Solofrana river basin, Southern Italy, which has been seriously and consistently in time affected by natural disasters. Data for about 45 MDH events, spanning on a decadal scale 1951-2014, have been collected and analyzed for this purpose. A preliminary monthly scale analysis of event occurrences highlights a pronounced seasonal characterization of the phenomenon, as about 60% of the total number of reported events take place during the period from September to November. Following, a statistical analysis clearly indicates a significant increase in the frequency of occurrences of MDHEs during the last decades. Such an increase appears to be related to non-stationary features of an average catchment scale rainfall-runoff erosivity index

  2. Cumulative Effects of Micro-Hydro Development on the Fisheries of the Swan River Drainage, Montana, First Annual Progress Report (Covering Field Season July-November 1982).

    Energy Technology Data Exchange (ETDEWEB)

    Leathe, Stephen A.; Graham, Patrick J.

    1984-03-01

    This fisheries study is to determine the potential cumulative biological and economic effects of 20 small or micro-hydro-electric facilities (less than 5 megawatts) proposed to be constructed on tributaries to the Swan River, a 1738 square kilometer (671 square mile) drainage located in northwestern Montana. The study addresses portions of measure 1204 (b) (2) of the Norwthwest Power Planning Council's Columbia River Basin Fish and Wildlife Program. Aerial pre-surveys conducted during 1982 identified 102 stream reaches that may support fish populations in the Swan drainage between Swan and Lindbergh lakes. These reaches were located in 49 tributary streams and constituted 416 kilometers (258 miles) of potential fish habitat. Construction of all proposed small hydro projects would divert water from 54 kilometers (34 miles) or about 13 percent of the tributary system. Only two of the 20 proposed hydro sites did not support trout populations and most were populated by migratory bull trout and westslope cutthroat trout. Potential cumulative habitat losses that could result from dewatering of all proposed project areas were predicted using a stream reach classification scheme involving stream gradient, drainage ara, and fish population data. Preliminary results of this worst case analysis indicate that 23, 19 and 6 percent of the high quality rearing habitat for cutthroat, bull, and brook trout respectively would be lost.

  3. An assessment of potential hydro-political tensions in transboundary river basins using environmental, political, and economic indicators

    Science.gov (United States)

    De Stefano, Lucia; Petersen-Perlman, Jacob; Sproles, Eric; Eynard, James; Wolf, Aaron T.

    2015-04-01

    Globally 286 river basins extend across international borders, covering over 61.9 million km2 of the earth's surface and hosting a total of approximately 2.7 billion people. In these basins, transboundary water resources support an interdependent web of environmental, political, and economic systems that can enhance or destabilize a region. We present an integrated global-scale assessment of transboundary watersheds to identify regions more likely to experience hydro-political tensions over the next decade and beyond based upon environmental, political, and economic indicators. We combine NASA's Gravity Recovery and Climate Experiment (GRACE) measurements of changes in terrestrial water storage with metrics of projected climate change impacts on water variability, the institutional capacity of countries to manage shared water resources, the development of new water infrastructure, per capita gross national income, domestic and international armed conflicts, and recent history of disputes over transboundary waters. The construction of new water-related infrastructure is on-going or planned in many basins worldwide. New water infrastructure is foreseen also in areas where instruments of international cooperation are still absent or limited in scope, e.g. in Southeast Asia, South Asia, Central America, the northern part of the South American continent, and the southern Balkans as well as in different parts of Africa. Moreover, in Central and Eastern Africa, the Middle East, and Central, South and South-East Asia there is a concomitance of several political, environmental and socioeconomic factors that could exacerbate hydropolitical tensions. Our analysis integrates political, economic and environmental metrics and is part of the United Nation's Transboundary Waters Assessment Programme to provide the first global-scale assessment of its type.

  4. Future changes in hydro-climatic extremes in the Upper Indus, Ganges, and Brahmaputra River basins.

    Science.gov (United States)

    Wijngaard, René R; Lutz, Arthur F; Nepal, Santosh; Khanal, Sonu; Pradhananga, Saurav; Shrestha, Arun B; Immerzeel, Walter W

    2017-01-01

    Future hydrological extremes, such as floods and droughts, may pose serious threats for the livelihoods in the upstream domains of the Indus, Ganges, Brahmaputra. For this reason, the impacts of climate change on future hydrological extremes is investigated in these river basins. We use a fully-distributed cryospheric-hydrological model to simulate current and future hydrological fluxes and force the model with an ensemble of 8 downscaled General Circulation Models (GCMs) that are selected from the RCP4.5 and RCP8.5 scenarios. The model is calibrated on observed daily discharge and geodetic mass balances. The climate forcing and the outputs of the hydrological model are used to evaluate future changes in climatic extremes, and hydrological extremes by focusing on high and low flows. The outcomes show an increase in the magnitude of climatic means and extremes towards the end of the 21st century where climatic extremes tend to increase stronger than climatic means. Future mean discharge and high flow conditions will very likely increase. These increases might mainly be the result of increasing precipitation extremes. To some extent temperature extremes might also contribute to increasing discharge extremes, although this is highly dependent on magnitude of change in temperature extremes. Low flow conditions may occur less frequently, although the uncertainties in low flow projections can be high. The results of this study may contribute to improved understanding on the implications of climate change for the occurrence of future hydrological extremes in the Hindu Kush-Himalayan region.

  5. Future changes in hydro-climatic extremes in the Upper Indus, Ganges, and Brahmaputra River basins.

    Directory of Open Access Journals (Sweden)

    René R Wijngaard

    Full Text Available Future hydrological extremes, such as floods and droughts, may pose serious threats for the livelihoods in the upstream domains of the Indus, Ganges, Brahmaputra. For this reason, the impacts of climate change on future hydrological extremes is investigated in these river basins. We use a fully-distributed cryospheric-hydrological model to simulate current and future hydrological fluxes and force the model with an ensemble of 8 downscaled General Circulation Models (GCMs that are selected from the RCP4.5 and RCP8.5 scenarios. The model is calibrated on observed daily discharge and geodetic mass balances. The climate forcing and the outputs of the hydrological model are used to evaluate future changes in climatic extremes, and hydrological extremes by focusing on high and low flows. The outcomes show an increase in the magnitude of climatic means and extremes towards the end of the 21st century where climatic extremes tend to increase stronger than climatic means. Future mean discharge and high flow conditions will very likely increase. These increases might mainly be the result of increasing precipitation extremes. To some extent temperature extremes might also contribute to increasing discharge extremes, although this is highly dependent on magnitude of change in temperature extremes. Low flow conditions may occur less frequently, although the uncertainties in low flow projections can be high. The results of this study may contribute to improved understanding on the implications of climate change for the occurrence of future hydrological extremes in the Hindu Kush-Himalayan region.

  6. A hydro-optical model for deriving water quality variables from satellite images (HydroSat): A case study of the Nile River demonstrating the future Sentinel-2 capabilities

    NARCIS (Netherlands)

    Salama, M.; Radwan, M.; van der Velde, R.

    2012-01-01

    This paper describes a hydro-optical model for deriving water quality variables from satellite images, hereafter HydroSat. HydroSat corrects images for atmospheric interferences and simultaneously retrieves water quality variables. An application of HydroSat to Landsat Enhanced Thematic Mapper (ETM)

  7. The changing hydro-ecological dynamics of rivers and deltas of the Western Indian Ocean: Anthropogenic and environmental drivers, local adaptation and policy response

    Science.gov (United States)

    Duvail, Stéphanie; Hamerlynck, Olivier; Paron, Paolo; Hervé, Dominique; Nyingi, Wanja D.; Leone, Michele

    2017-10-01

    The rivers flowing into the Western Indian Ocean have steep headwater gradients and carry high sediment loads. In combination with strong tides and seasonal rainfall, these rivers create dynamic deltas with biodiversity-rich and productive ecosystems that, through flooding, have sustained indigenous use systems for centuries. However, river catchments are rapidly changing due to deforestation. Hydropower dams also increasingly alter flood characteristics, reduce sediment supply and contribute to coastal erosion. These impacts are compounded by climate change. Altogether, these changes affect the livelihoods of the delta users. Here, based on prior works that we and others have conducted in the region, we analyse the drivers of these hydro-ecological changes. We then provide recommendations for improved dam design and operations to sustain the underlying delta-building processes, the ecosystem values and the needs of the users.

  8. Analysis of the potential of small hydro-power installations - Preliminary study on hydro-power schemes on rivers; Programm Kleinwasserkraftwerke. Potenzialanalyse Kleinwasserkraftwerke - Vorstudie zu Kraftwerken an Fliessgewaessern

    Energy Technology Data Exchange (ETDEWEB)

    Baur, M.; Dettli, R. [econcept AG, Zuerich (Switzerland); Weingartner, R.; Viviroli, D.; Imhof, P.; Faessler, M.; Gerhardinger, H. [University of Berne, Geographisches Institut, Gruppe fuer Hydrologie (GIUB), Berne (Switzerland)

    2006-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results obtained from an analysis of the potential of small hydro-power installations in Switzerland. The current situation is reviewed and a 'bottom-up' analysis of the potential available is made. Data is presented on the potential of installations with power-ratings above and below 300 kW. Cantonal case-studies are examined. In a further 'top-down' examination, flow-rates and height-differences are looked at. The development of a 'potential-map' for Switzerland is described. The report is completed with the presentation of the conclusions made from the work. Suggestions for further work that could be done on the subject are made.

  9. The use of remote sensing and GIS techniques with special emphasis on the use of Arc hydro data model in characterizing Atbara River watershed

    International Nuclear Information System (INIS)

    Adam, M. H. M.

    2010-11-01

    Remote sensing and GIS techniques were used successfully to establish hydrological information platform for Atbara sub-basin which drains from Ethiopia and Eretria to Sudan with entire area of about 224299 Km 2 . The study area have strategic importance, for many reasons; rich in minerals wealth, agricultural resources, and endowed with a substantial amount of water resources but the spatial and temporal distribution of water resources is imbalance. Remote Sensing and Digital elevation models (DEMs) are known to be very useful data sources for the automated delineation of flow paths, sub watersheds and flow networks for hydrologic modeling and watershed characterization, Landsat ETM + 30 m and Digital Elevation Models SRTM 90 m data used in this project, many digital image processing techniques used to enhanced images, interpretation and extracted information from satellite images by using ERDAS imagine, wile Arc GIS and arc hydro tools were used to processing and extract information from DEMs, stream network and catchment delineation and creation of geo database. It is the main output of this project, ready made GIS layers used to complete watershed characterizations view. The results of this research present in creation Arc hydro data model, and many thematic maps for Atbara sub-basin characteristics. The use of remote sensing in the study give efficient qualitative and quantitative detailed information about geomorphologic features drainage patterns, addition to general overview for land cover and land use. Moreover, the use of Digital Elevation Models in addition to the delineation of stream network and catchment give valuable information on the pale-geography and pale-climate of the study area. River network and watersheds delineations proved that El Gash River was once joining the Atbara River and it was a part of Nile Basin System. This might indicate that pale climatic conditions in the area were wet than the present. Geo database and Arc hydro data model

  10. Oceanographic and surface meteorological data collected from station Port of Albany weather/hydro by Hudson River Environmental Conditions Observing System (HRECOS) and assembled by Mid-Atlantic Regional Association Coastal Ocean Observing System (MARACOOS) in the Hudson River from 2011-01-04 to 2017-07-31 (NCEI Accession 0163364)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0163364 contains oceanographic and surface meteorological data collected at Port of Albany weather/hydro, a fixed station in the Hudson River. These...

  11. Oceanographic and surface meteorological data collected from station Schodack Island hydro/weather by Hudson River Environmental Conditions Observing System (HRECOS) and assembled by Mid-Atlantic Regional Association Coastal Ocean Observing System (MARACOOS) in the Hudson River from 2008-04-25 to 2017-05-31 (NCEI Accession 0163416)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0163416 contains oceanographic and surface meteorological data collected at Schodack Island hydro/weather, a fixed station in the Hudson River. These...

  12. Hydro-Economic Modeling with Minimum Data Requirements: An Application to the São Francisco River Basin, Brazil

    Science.gov (United States)

    Torres, M.; Maneta, M.; Vosti, S.; Wallender, W.; Howitt, R.

    2008-12-01

    coefficients to calculate adjusted transpiration, and reservoir operating rules. Linking the Hydro and Economic Models. Based on the crop mix and area under plow of a reference year the economic model of agriculture was calibrated. Following a Monte Carlo procedure, the statistical distribution of water flows was estimated at each of the 16 selected nodes in the SFRB. The 5th and 95th percentiles of that distribution were used as benchmarks of water availability for drought and wet years, respectively. After subtracting 2000 m3 s-1 reserved for downstream uses estimates of water availability are used as constraints in the net revenue maximization algorithm included in the model of agriculture economics. If water is binding, it will influence crop mix, area under plow and product mix choices. Results. The application of the Brazilian federal water use policies will have immediate and substantial effects on agricultural area and product mix. Agricultural incomes will fall, especially in downstream areas located near major river channels.

  13. Short-term optimization of the new Avce pumping plant and three existing hydro power plants on the Soca river in Slovenia

    International Nuclear Information System (INIS)

    Bregar, Zvonko

    2007-01-01

    In the following years a new pumping plant Avce is going to join the existing cascade of three small-regulating-basin hydro power plants (HPPs) on the Soca river in Slovenia. The pumping plant operation will have to be synchronous to the operation of existing plants and vice versa since all four plants depend upon the same inflow and since they all belong to the same generation company that buys and sells electricity to a day-ahead electricity market. The Soca river has torrent alpine characteristics so there are doubts about the operation of the system in frequent dry seasons. As shown in this article, such questions can be effectively solved by first presenting the hydro system of four HPPs under study as a directed graph and then as a mixed integer linear program (MILP): a set of equations and inequations modeling technical issues of HPPs and a target function (the day-ahead market price) modeling the electricity market. A small and simple MILP model called Flores has been used for this study. The MILP approach requires only to specify the problem since the solution is found by using available commercial computer solvers. It can be applied on-line and it can be augmented to include also the transmission constraints, ancillary services, etc. (author)

  14. Short-term optimization of the new Avce pumping plant and three existing hydro power plants on the Soca river in Slovenia

    Energy Technology Data Exchange (ETDEWEB)

    Bregar, Zvonko [Milan Vidmar Electric Power Research Institute, Hajdrihova 2, SI-1000 Ljubljana (Slovenia)

    2007-08-15

    In the following years a new pumping plant Avce is going to join the existing cascade of three small-regulating-basin hydro power plants (HPPs) on the Soca river in Slovenia. The pumping plant operation will have to be synchronous to the operation of existing plants and vice versa since all four plants depend upon the same inflow and since they all belong to the same generation company that buys and sells electricity to a day-ahead electricity market. The Soca river has torrent alpine characteristics so there are doubts about the operation of the system in frequent dry seasons. As shown in this article, such questions can be effectively solved by first presenting the hydro system of four HPPs under study as a directed graph and then as a mixed integer linear program (MILP): a set of equations and inequations modeling technical issues of HPPs and a target function (the day-ahead market price) modeling the electricity market. A small and simple MILP model called Flores has been used for this study. The MILP approach requires only to specify the problem since the solution is found by using available commercial computer solvers. It can be applied on-line and it can be augmented to include also the transmission constraints, ancillary services, etc. (author)

  15. 78 FR 56224 - Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3401-049] Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption 1. By documentation filed July 8, 2013 and supplemented... Hydro-WM, LLC. The project is located on the Rockfish River in Nelson County, Virginia. The transfer of...

  16. Hydro-economic modeling of water scarcity under global change: an application to the Gállego river basin (Spain)

    NARCIS (Netherlands)

    Graveline, N.; Majone, B.; van Duinen, Rianne; Ansink, E.

    2014-01-01

    Integrated approaches are needed to assess the effects of global changes on the future state of water resources at regional scales. We develop a hydro-economic model of the Gállego catchment, Spain, to assess how global change and policy options affect the catchment’s water scarcity and the economic

  17. Taylor Hydro plant goes live

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The 12.75 MW Taylor Hydroelectric Plant in Magrath, Alberta, synchronized its generator with the Alberta Power Grid and began production in April 2000. The plant is located on Government of Alberta irrigation works and is owned by Canadian Hydro Developers. During the irrigation season the plant will generate approximately 40 million kilowatt hours of zero-emission 'green' power for consumption, enough to power 5,000 homes for a year. The Taylor plant is a joint venture with EPCOR Power Development Corporation, a wholly-owned subsidiary of EPCOR Inc., the City of Edmonton utility. Canadian Hydro Developers also owns a 19 MW wind plant and a 6 MW gas plant in Alberta and five other 'run of river' hydro plants in Ontario and British Columbia. The company is committed to the concept of low-impact power generation; its ownership of wind run-of-river hydro and gas-fired facilities is proof of that commitment

  18. Hydro electric scheme on the Forestay river. Communes of Chexbres and Rivaz. Feasibility study; Turbinage du Forestay. Communes de Chexbres et Rivaz. Etude d'avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-06-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) is a feasibility study of the retrofitting of the small hydro electric scheme located in Rivaz, Switzerland on the shore of the lake of Geneva. Water of the Forestay river, which crosses a steep wine region, is used in a 89 kW Pelton turbine with a water head of 63 m and a maximum flow rate of 180 litre/s, producing about 350,000 kWh/year for now more than 50 years. After retrofitting the maximum electric power produced should be 707 kW, generating 2,500,000 kWh/y by using a water head of 184 m and a maximum flow rate of 500 litre/s. Part of the new equipment would be mounted underground in order to respect the aesthetics of the beautiful site. Electricity production cost is estimated to be 0.109 CHF/kWh.

  19. Toward hydro-social modeling: Merging human variables and the social sciences with climate-glacier runoff models (Santa River, Peru)

    Science.gov (United States)

    Carey, Mark; Baraer, Michel; Mark, Bryan G.; French, Adam; Bury, Jeffrey; Young, Kenneth R.; McKenzie, Jeffrey M.

    2014-10-01

    Glacier shrinkage caused by climate change is likely to trigger diminished and less consistent stream flow in glacier-fed watersheds worldwide. To understand, model, and adapt to these climate-glacier-water changes, it is vital to integrate the analysis of both water availability (the domain of hydrologists) and water use (the focus for social scientists). Drawn from a case study of the Santa River watershed below Peru’s glaciated Cordillera Blanca mountain range, this paper provides a holistic hydro-social framework that identifies five major human variables critical to hydrological modeling because these forces have profoundly influenced water use over the last 60 years: (1) political agendas and economic development; (2) governance: laws and institutions; (3) technology and engineering; (4) land and resource use; and (5) societal responses. Notable shifts in Santa River water use-including major expansions in hydroelectricity generation, large-scale irrigation projects, and other land and resource-use practices-did not necessarily stem from changing glacier runoff or hydrologic shifts, but rather from these human variables. Ultimately, then, water usage is not predictable based on water availability alone. Glacier runoff conforms to certain expected trends predicted by models of progressively reduced glacier storage. However, societal forces establish the legal, economic, political, cultural, and social drivers that actually shape water usage patterns via human modification of watershed dynamics. This hydro-social framework has widespread implications for hydrological modeling in glaciated watersheds from the Andes and Alps to the Himalaya and Tien Shan, as well as for the development of climate change adaptation plans.

  20. Vaksvikelva small hydro

    OpenAIRE

    Loe, Daniel Aarset

    2017-01-01

    Norway is in constant need of renewable energy, and hydroelectric power is still the main source. A great future potential can be found in countless small rivers scattered across the country, which could be developed through small hydro projects. In the process of converting mechanical movement - flowing water - into electric energy, about 5% turns into heat. From a power plant with an annual production of 15 GWh, this means energy enough to heat approximately 30 households is lost. In my pro...

  1. Detection of Anomalies and Changes of Rainfall in the Yellow River Basin, China, through Two Graphical Methods

    Directory of Open Access Journals (Sweden)

    Hao Wu

    2017-12-01

    Full Text Available This study aims to reveal rainfall anomalies and changes over the Yellow River Basin due to the fragile ecosystem and rainfall-related disasters. Common trend analyses relate to overall trends in mean values. Therefore, we used two graphical methods: the quantile perturbation method (QPM was used to investigate anomalies over time in extreme rainfall, and the partial trend method (PTM was used to analyze rainfall changes at different intensities. A nonparametric bootstrap procedure is proposed in order to identify significant PTM indices. The QPM indicated prevailing positive anomalies in extreme daily rainfall 50 years ago and in the middle reaches during the 1970s and 1980s. The PTM detected significant decreases in annual rainfall mainly in the latter half of the middle reaches, two-thirds of which occurred in high and heavy rainfall. Most stations in the middle and lower reaches showed significant decreases in rainy days. Daily rainfall intensity had a significant increase at 13 stations, where rainy days were generally decreasing. The combined effect of these opposing changes explains the prevailing absence of change in annual rainfall, and the observed decreases in annual rainfall can be attributed to the decreasing number of rainy days. The changes in rainy days and rainfall intensity were dominated by the wet season and dry season, respectively.

  2. Modeling invasive alien plant species in river systems : Interaction with native ecosystem engineers and effects on hydro-morphodynamic processes

    NARCIS (Netherlands)

    van Oorschot, M.; Kleinhans, M. G.; Geerling, G.W.; Egger, G.; Leuven, R.S.E.W.; Middelkoop, H.

    2017-01-01

    Invasive alien plant species negatively impact native plant communities by out-competing species or changing abiotic and biotic conditions in their introduced range. River systems are especially vulnerable to biological invasions, because waterways can function as invasion corridors. Understanding

  3. Small hydro

    International Nuclear Information System (INIS)

    Bennett, K.; Tung, T.

    1995-01-01

    A small hydro plant in Canada is defined as any project between 1 MW and 15 MW but the international standard is 10 MW. The global market for small hydro development was considered good. There are some 1000 to 2000 MW of generating capacity being added each year. In Canada, growth potential is considered small, primarily in remote areas, but significant growth is anticipated in Eastern Europe, Africa and Asia. Canada with its expertise in engineering, manufacturing and development is considered to have a good chance to take advantage of these growing markets

  4. Hydro-economic performances of streamflow withdrawal strategies: the case of small run-of-river power plants

    Science.gov (United States)

    Basso, Stefano; Lazzaro, Gianluca; Schirmer, Mario; Botter, Gianluca

    2014-05-01

    River flows withdrawals to supply small run-of-river hydropower plants have been increasing significantly in recent years - particularly in the Alpine area - as a consequence of public incentives aimed at enhancing energy production from renewable sources. This growth further raised the anthropic pressure in areas traditionally characterized by an intense exploitation of water resources, thereby triggering social conflicts among local communities, hydropower investors and public authorities. This brought to the attention of scientists and population the urgency for novel and quantitative tools for assessing the hydrologic impact of these type of plants, and trading between economic interests and ecologic concerns. In this contribution we propose an analytical framework that allows for the estimate of the streamflow availability for hydropower production and the selection of the run-of-river plant capacity, as well as the assessment of the related profitability and environmental impacts. The method highlights the key role of the streamflow variability in the design process, by showing the significance control of the coefficient of variation of daily flows on the duration of the optimal capacity of small run-of-river plants. Moreover, the analysis evidences a gap between energy and economic optimizations, which may result in the under-exploitation of the available hydropower potential at large scales. The disturbances to the natural flow regime produced between the intake and the outflow of run-of-river power plants are also estimated within the proposed framework. The altered hydrologic regime, described through the probability distribution and the correlation function of streamflows, is analytically expressed as a function of the natural regime for different management strategies. The deviations from pristine conditions of a set of hydrologic statistics are used, jointly with an economic index, to compare environmental and economic outcomes of alternative plant

  5. A GIS TOOL TO EVALUATE THE SPATIAL EVOLUTION OF HYDRO-THERMIC FEATURES DURING GROWING SEASON OF VEGETABLE CROPS IN ELBE RIVER LOWLAND (POLABI

    Directory of Open Access Journals (Sweden)

    VERA POTOP

    2012-11-01

    Full Text Available A GIS tool to evaluate the spatial evolution of hydro-thermic features during growing season of vegetable crops in Elbe River lowland (Polabi. This article presents the results of the first study on combined mezoclimatological, microclimatological and topographical tools for evaluating precision farming in the growth of vegetable crops in the Elbe River lowland (Polabi region from the Czech Republic. We assess the variability of basically climatological characteristics in relation to topographic characteristics at the regional (Polabi and local (agricultural farm scales. At regional scale, interpolation approach is based on local linear regression and universal kriging interpolation. At local scale, two conventional interpolation methods, spline and local ordinary kriging with a Gaussian model variance across the fields, were applied. The local spline interpolators have been used in developing digital elevation models (DEMs and to determine the slope angle inclination of vegetable fields. The DEMs of the vegetable crops fields was developed at a 10 m x 10 m resolution based on elevation data collected in the field by a hand-held RTK- Global Positioning System receiver. This tool allowed the distinction of microclimatic conditions that produce altitude-slope-related patterns of the spatial-temporal distribution of the basic meteorological elements during growing season of vegetable crops. The effect of slope on diurnal extreme temperatures in the vegetable cropped field conditions was more pronounced than that of elevation. Accordingly to developed maps, the warmest and longest duration of sunshine, and the least precipitation totals during growing season occurred in the middle part of Polabi.

  6. Challenging hydro-hegemony

    DEFF Research Database (Denmark)

    Wessels, Josepha Ivanka

    2015-01-01

    Bank. Both case studies show that control over water resources and supply provides political power over others at local level. Yet non-violent resistance can be observed in these border areas. In border areas between Israel, Syria and Palestine, control over access and water supply plays an important...... role in the ability of Israel to exercise hegemonic power in daily hydro-politics, which in the long term is detrimental for the people and the environment and disrupts the hydrological balance in the entire Jordan River basin....

  7. Hydro-power

    International Nuclear Information System (INIS)

    Piro, P.

    2010-01-01

    On average the hydro-power sector produces 12% of the electrical power in France. A quarter of this production might pass to another operator than EDF because the end of some grants is nearing (2012 for 12 installations). In France the power of rivers belongs to the state that gives operators grants to harness it. The allowance lasts 75 years usually but for installations below 4.5 MW a permanent and definitive grant is allowed. Most installations are ancient and their investment have been paid off since a long, so hydro-power is the most profitable renewable energy in France. A lot of bidders are expected. Each bid will be assessed on 3 criteria: -) the global energy efficiency of the waterfall, -) a balanced management of the water resource, and -) an economic and financial offer to the state. The balance between the different uses of water is getting more delicate to reach and this renewal of grants will be an opportunity for the state to impose a better preservation of the environment. In July 2008, the French government announced a program for the re launching of the hydro-power, this program has been reduced and now only 3000 GWh supplementary are expected by 2020. (A.C.)

  8. Behavior of Agricultural water users induced hydro-climatic cycle change in Heihe River Basin, in the northwest of china

    Science.gov (United States)

    Wu, F.; Deng, X.; Cai, X.; Zhang, X.; Zhang, Q.

    2017-12-01

    Water allocation unbalance is the most important driving force of ecological degradation in the Heihe River Basin, where it seems the lifeblood of environment and human society. Water commute complex and frequent in soil, atmosphere, surface and ground face. The balance analysis of Water's transformation based on the WRF (Weather Research Forecasting) and SWAT (Soil and Water Assessment Tool) simulations, puts forward the application of land governance in arid and semi-arid region. In this study, we designed an irrigation scheme using local field experiences and incorporated the irrigation scheme into WRF/Noah-MP model. Then, to test the effects of irrigation scheme on performance of WRF/Noah-MP model, we carried out two simulations with the Heihe watershed, Northwest China, as a case study area. Firstly, the irrigation simulation is meanly about 860 mm across all of 671 cropland grid cells within the Heihe watershed and gradually increases from about 500 mm nearby the foot of Qilian Mountain to the maximum about 1500 mm in the middle and lower reach of Heihe River. Both of regional mean value and spatial heterogeneity are close to ground measurements. Secondly, the irrigation simulation dramatically reduced the mean bias of specified humidity to -0.47 g kg-1 (accounting for 6.0% of observation) and RMSE of temperature to 0.47 °C, respectively, since the irrigation enhanced the surface latent heat and weakened sensible heat to atmosphere. Thirdly, Across the 8 agricultural sites, the correlation coefficient and RMSE increased from 0.75 to 0.80. Finally, we found the surface runoff will increase by 0.46% with SWAT model at irrigation months. Therefore, the irrigation may led to expansion of cultivated land through transformation from groundwater to surface water at some degree. Water authorities should strengthen the tough water management measures to implement measures of total quantity control and raise the efficiency of water resources.

  9. Hydro adventurers

    International Nuclear Information System (INIS)

    Wood, Janet

    2000-01-01

    Some of the changes brought about by privatisation of the hydroelectric power industry in Ecuador are discussed. At present, about 25% of the population has no electricity supply; in the remaining areas demand is increasing. Seven new facilities are presently under discussion and these are described briefly. A plant at Abitugua is to be developed as a 'merchant plant' and the meaning and implications of this are described in detail. The present financing programme for Abituaga and an alternative financing programme are detailed. By 2010, some 40% of Ecuador's electricity is expected to come from hydro

  10. Novel Control Strategy for Multiple Run-of-the-River Hydro Power Plants to Provide Grid Ancillary Services

    Energy Technology Data Exchange (ETDEWEB)

    Mohanpurkar, Manish; Luo, Yusheng; Hovsapian, Rob; Muljadi, Eduard; Gevorgian, Vahan; Koritarov, Vladimir

    2017-07-12

    Hydropower plant (HPP) generation comprises a considerable portion of bulk electricity generation and is delivered with a low-carbon footprint. In fact, HPP electricity generation provides the largest share from renewable energy resources, which include wind and solar. Increasing penetration levels of wind and solar lead to a lower inertia on the electric grid, which poses stability challenges. In recent years, breakthroughs in energy storage technologies have demonstrated the economic and technical feasibility of extensive deployments of renewable energy resources on electric grids. If integrated with scalable, multi-time-step energy storage so that the total output can be controlled, multiple run-of-the-river (ROR) HPPs can be deployed. Although the size of a single energy storage system is much smaller than that of a typical reservoir, the ratings of storages and multiple ROR HPPs approximately equal the rating of a large, conventional HPP. This paper proposes cohesively managing multiple sets of energy storage systems distributed in different locations. This paper also describes the challenges associated with ROR HPP system architecture and operation.

  11. Impacts of climate change on the food-energy-water nexus in the upper Yellow River Basin: An integrated hydro-economic modeling approach

    Science.gov (United States)

    Si, Y.; Cai, X.

    2017-12-01

    The large-scale reservoir system built on the upper Yellow River serves multiple purposes. The generated hydropower supplies over 60% of the entire electricity for the regional power grid while the irrigated crop production feeds almost one-third of the total population throughout the whole river basin. Moreover, the reservoir system also bears the responsibility for controlling ice flood, which occurs during the non-flood season due to winter ice freezing followed by spring thawing process, and could be even more disastrous than the summer flood. The contradiction of water allocation to satisfy multi-sector demands while mitigating ice flood risk has been longstanding. However, few researchers endeavor to employ the nexus thinking to addressing the complexities involved in all the interlinked purposes. In this study, we develop an integrated hydro-economic model that can be used to explore both the tradeoffs and synergies between the multiple purposes, based on which the water infrastructures (e.g., reservoir, diversion canal, pumping well) can be coordinated for maximizing the co-benefits of multiple sectors. The model is based on a node-link schematic of multiple operations including hydropower generation, irrigation scheduling, and the conjunctive use of surface and ground water resources. In particular, the model depicts some details regarding reservoir operation rules during the ice season using two indicators, i.e., flow control period and flow control level. The rules are obtained from historical records using data mining techniques under different climate conditions, and they are added to the model as part of the system constraints. Future reservoir inflow series are generated by a hydrological model with future climate scenarios projected by General Circulation Model (GCM). By analyzing the model results under the various climate scenarios, the future possible shifting trajectory of the food-energy-water system characteristics will be derived compared to

  12. Resettlement associated with hydro projects in China

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The flow rates of Chinese rivers are subject to major seasonal fluctuations, and as a result large reservoirs have to be constructed for flood control, irrigation, and power generation. As most of the river valleys are densely populated, the relocation and resettlement of people from the reservoir areas are major but unavoidable problems to be addressed in building hydro projects in China. (author)

  13. R graphics

    CERN Document Server

    Murrell, Paul

    2005-01-01

    R is revolutionizing the world of statistical computing. Powerful, flexible, and best of all free, R is now the program of choice for tens of thousands of statisticians. Destined to become an instant classic, R Graphics presents the first complete, authoritative exposition on the R graphical system. Paul Murrell, widely known as the leading expert on R graphics, has developed an in-depth resource that takes nothing for granted and helps both neophyte and seasoned users master the intricacies of R graphics. After an introductory overview of R graphics facilities, the presentation first focuses

  14. Hydro-Quebec's buyback tariff

    International Nuclear Information System (INIS)

    Richard, J.C.

    1992-01-01

    Hydro-Quebec had an installed electric generation capacity of 25,682 MW in 1990, of which 23,927 MW was hydraulic. Of the 26 thermal power plants, 22 are in remote communities on islands or in the north part of the province. The utility's development plan predicts an annual growth in demand of 2.6% to reach ca 200 TWh in 2006; this demand would be reduced to ca 180 TWh by energy efficiency measures. To increase capacity, Hydro-Quebec can utilize the hydro generation potential of its large rivers, of which 18,000 MW is economically viable, and its small rivers. Of the 10,000 MW theoretical potential of the latter, a large fraction cannot be economically developed under existing conditions. The utility has a policy to purchase energy as a function of the price of fossil fuel. For wind energy, this price was 4.22 cents/kWh in 1991; this price will be increased annually according to the inflation index. In its isolated sites such as the Magdalen Islands, current costs of diesel-generated electricity are at least 5.5 cents/kWh. There are possibilities for installing wind plants in isolated regions but their automatic control systems need to be improved for achieving a larger utilization factor relative to diesel generation and their cost needs to be reduced. 1 tab

  15. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    McCredie, J.

    1984-01-01

    This report briefly describes Ontario Hydro's nuclear program, examining the design and construction status, and the future from Ontario Hydro's perspective. Ontario Hydro relies heavily on nuclear power. Nuclear fuel was responsible for approximately 34% of Ontario Hydro's energy production in 1983. The nuclear proportion was supplied by twelve operating units located: NPD, Douglas Point, Pickering A and B. It is expected that by approximately 1992, 65% of the total energy needs will be generated through nuclear power

  16. Decision support for the management of water resources at Sub-middle of the São Francisco river basin in Brazil using integrated hydro-economic modeling and scenarios for land use changes

    Science.gov (United States)

    Moraes, M. G. A.; Souza da Silva, G.

    2016-12-01

    Hydro-economic models can measure the economic effects of different operating rules, environmental restrictions, ecosystems services, technical constraints and institutional constraints. Furthermore, water allocation can be improved by considering economical criteria's. Likewise, climate and land use change can be analyzed to provide resilience. We developed and applied a hydro-economic optimization model to determine the optimal water allocation of main users in the Lower-middle São Francisco River Basin in Northeast (NE) Brazil. The model uses demand curves for the irrigation projects, small farmers and human supply, rather than fixed requirements for water resources. This study analyzed various constraints and operating alternatives for the installed hydropower dams in economic terms. A seven-year period (2000-2006) with water scarcity in the past has been selected to analyze the water availability and the associated optimal economic water allocation. The used constraints are technical, socioeconomic and environmental. The economically impacts of scenarios like prioritizing human consumption, impacts of the implementation of the São Francisco river transposition, human supply without high distribution losses, environmental hydrographs, forced reservoir level control, forced reduced reservoir capacity, alteration of lower flow restriction were analyzed. The results in this period show that scarcity costs related ecosystem service and environmental constraints are significant, and have major impacts (increase of scarcity cost) for consumptive users like irrigation projects. In addition, institutional constraints such as prioritizing human supply, minimum release limits downstream of the reservoirs and the implementation of the transposition project impact the costs and benefits of the two main economic sectors (irrigation and power generation) in the region of the Lower-middle of the São Francisco river basin. Scarcity costs for irrigation users generally

  17. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  18. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  19. Graphic Storytelling

    Science.gov (United States)

    Thompson, John

    2009-01-01

    Graphic storytelling is a medium that allows students to make and share stories, while developing their art communication skills. American comics today are more varied in genre, approach, and audience than ever before. When considering the impact of Japanese manga on the youth, graphic storytelling emerges as a powerful player in pop culture. In…

  20. Hydro-economic optimization model for selecting least cost programs of measures at the river basin scale. Application to the implementation of the EU Water Framework Directive on the Orb river basin (France).

    Science.gov (United States)

    Girard, C.; Rinaudo, J. D.; Caballero, Y.; Pulido-Velazquez, M.

    2012-04-01

    This article presents a case study which illustrates how an integrated hydro-economic model can be applied to optimize a program of measures (PoM) at the river basin level. By allowing the integration of hydrological, environmental and economic aspects at a local scale, this model is indeed useful to assist water policy decision making processes. The model identifies the least cost PoM to satisfy the predicted 2030 urban and agricultural water demands while meeting the in-stream flow constraints. The PoM mainly consists of water saving and conservation measures at the different demands. It includes as well some measures mobilizing additional water resources coming from groundwater, inter-basin transfers and improvement in reservoir operating rules. The flow constraints are defined to ensure a good status of the surface water bodies, as defined by the EU Water Framework Directive (WFD). The case study is conducted in the Orb river basin, a coastal basin in Southern France. It faces a significant population growth, changes in agricultural patterns and limited water resources. It is classified at risk of not meeting the good status by 2015. Urban demand is calculated by type of water users at municipality level in 2006 and projected to 2030 with user specific scenarios. Agricultural water demand is estimated at irrigation district (canton) level in 2000 and projected to 2030 under three agricultural development scenarios. The total annual cost of each measure has been calculated taken into account operation and maintenance costs as well as investment cost. A first optimization model was developed using GAMS, General Algebraic Modeling System, applying Mixed Integer Linear Programming. The optimization is run to select the set of measures that minimizes the objective function, defined as the total cost of the applied measures, while meeting the demands and environmental constraints (minimum in-stream flows) for the 2030 time horizon. The first result is an optimized Po

  1. Ontario Hydro's DSP update

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Ontario Hydro's Demand/Supply Plan (DSP), the 25 year plan which was submitted in December 1989, is currently being reviewed by the Environmental Assessment Board (EAB). Since 1989 there have been several changes which have led Ontario Hydro to update the original Demand/Supply Plan. This information sheet gives a quick overview of what has changed and how Ontario Hydro is adapting to that change

  2. B.C. Hydro : 1997 annual report

    International Nuclear Information System (INIS)

    1997-01-01

    Operating and financial information from B.C. Hydro for 1997 is presented. B.C. Hydro is the third largest electric utility in Canada. The utility generates between 43,000 and 54,000 gigawatt-hours of electricity annually. More than 80 per cent of the electricity is produced by major hydroelectric generating stations on the Columbia and Peace rivers. This report presents a picture of improved financial performance, details of all revenues and expenditures and capsule summaries of the Utility's operations. The report also addresses issues regarding strategic direction, local and international competition, and consultation and regulatory activities. tabs. and figs

  3. Graphics gems

    CERN Document Server

    Glassner, Andrew S

    1993-01-01

    ""The GRAPHICS GEMS Series"" was started in 1990 by Andrew Glassner. The vision and purpose of the Series was - and still is - to provide tips, techniques, and algorithms for graphics programmers. All of the gems are written by programmers who work in the field and are motivated by a common desire to share interesting ideas and tools with their colleagues. Each volume provides a new set of innovative solutions to a variety of programming problems.

  4. Graphic notation

    DEFF Research Database (Denmark)

    Bergstrøm-Nielsen, Carl

    1992-01-01

    Texbook to be used along with training the practise of graphic notation. Describes method; exercises; bibliography; collection of examples. If you can read Danish, please refer to that edition which is by far much more updated.......Texbook to be used along with training the practise of graphic notation. Describes method; exercises; bibliography; collection of examples. If you can read Danish, please refer to that edition which is by far much more updated....

  5. Brigham City Hydro Generation Project

    Energy Technology Data Exchange (ETDEWEB)

    Ammons, Tom B. [Energy Conservation Specialist, Port Ewen, NY (United States)

    2015-10-31

    the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction

  6. Anticipating Central Asian Water Stress: Variation in River Flow Dependency on Melt Waters from Alpine to Plains in the Remote Tien Shan Range, Kyrgyzstan Using a Rapid Hydro Assessment Methodology

    Science.gov (United States)

    Hill, A. F.; Wilson, A. M.; Williams, M. W.

    2016-12-01

    The future of mountain water resources in High Asia is of high interest to water managers, development organizations and policy makers given large populations downstream reliant on snow and ice sourced river flow. Together with historical and cultural divides among ex-Soviet republics, a lack of central water management following the Soviet break-up has led to water stress as trans-boundary waters weave through and along borders. New upstream hydropower development, a thirsty downstream agricultural sector and a shrinking Aral Sea has led to increasing tension in the region. Despite these pressures and in contrast to eastern High Asia's Himalayan basins (Ganges, Brahmaputra), little attention has been given to western High Asia draining the Pamir and Tien Shan ranges (Syr Darya and Amu Darya basins) to better understand the hydrology of this vast and remote area. Difficult access and challenging terrain exacerbate challenges to working in this remote mountain region. As part of the Contributions to High Asia Runoff from Ice and Snow (CHARIS) project, we asked how does river flow source water composition change over an alpine-to-plains domain of Kyrgyzstan's Naryn River in the Syr Darya basin? In addition, what may the future hold for river flow in Central Asia given the differing responses of snow and ice to climate changes? Utilizing a Rapid Hydrologic Assessment methodology including a suite of pre-field mapping techniques we collected in situ water chemistry data at targeted, remote mountain sites over 450km of the Naryn River over an elevation gradient from glacial headwaters to the lower lying areas - places where people, hydropower and agriculture utilize water. Chemical and isotope tracers were used to separate stream flow to understand relative dependency on melt waters as the river moves downstream from glaciers and snow covered areas. This case study demonstrates a technique to acquire field data over large scales in remote regions that facilitates

  7. Hydro-energy

    International Nuclear Information System (INIS)

    Bacher, P.; Tardieu, B.

    2005-01-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  8. Graphic Ecologies

    Directory of Open Access Journals (Sweden)

    Brook Weld Muller

    2014-12-01

    Full Text Available This essay describes strategic approaches to graphic representation associated with critical environmental engagement and that build from the idea of works of architecture as stitches in the ecological fabric of the city. It focuses on the building up of partial or fragmented graphics in order to describe inclusive, open-ended possibilities for making architecture that marry rich experience and responsive performance. An aphoristic approach to crafting drawings involves complex layering, conscious absence and the embracing of tension. A self-critical attitude toward the generation of imagery characterized by the notion of ‘loose precision’ may lead to more transformative and environmentally responsive architectures.

  9. Graphics gems

    CERN Document Server

    Heckbert, Paul S

    1994-01-01

    Graphics Gems IV contains practical techniques for 2D and 3D modeling, animation, rendering, and image processing. The book presents articles on polygons and polyhedral; a mix of formulas, optimized algorithms, and tutorial information on the geometry of 2D, 3D, and n-D space; transformations; and parametric curves and surfaces. The text also includes articles on ray tracing; shading 3D models; and frame buffer techniques. Articles on image processing; algorithms for graphical layout; basic interpolation methods; and subroutine libraries for vector and matrix algebra are also demonstrated. Com

  10. Graphic notation

    DEFF Research Database (Denmark)

    Bergstrøm-Nielsen, Carl

    2010-01-01

    Graphic notation is taught to music therapy students at Aalborg University in both simple and elaborate forms. This is a method of depicting music visually, and notations may serve as memory aids, as aids for analysis and reflection, and for communication purposes such as supervision or within...

  11. Hydro-climatology

    DEFF Research Database (Denmark)

    The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal with under......The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal...... considered. The interdisciplinary approach reveals information and perspective that go beyond the study of cli ate and hydro gy alone...

  12. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  13. Hydro under shock

    International Nuclear Information System (INIS)

    Maffezzini, I.; Pineault, E.; Poirier, M.

    1997-01-01

    A discussion of the potential privatisation of Hydro-Quebec, and of the motivation to do so, was presented. The creation of Hydro-Quebec resulted from the nationalization in 1963 of all major electricity producers in the province of Quebec. Since its inception, Hydro-Quebec has gone through many episodes of restructuring but none more far reaching in extent, or in consequences, than the present one. The current deregulation of the electrical industry in Quebec, and the potential commercialization of Hydro-Quebec is considered to be a natural and inevitable result of the current global trend towards competition in the power industry and the demand for greater consumer choice. 1 tab

  14. Concession renewal of Kembs' hydroelectric head on the Rhine river; Renouvellement de la concession de la chute hydro-electrique de Kembs sur le Rhin

    Energy Technology Data Exchange (ETDEWEB)

    Baron, P.; Defoug, H.; Petit, D

    2000-07-15

    In order to evaluate the different impacts of the concession renewal of Kembs' water head on the Rhine river, all aspects have been considered and are reported in this document: international aspects, influence of the dam on navigation and floods, hydrology of Alsace plain, ecological, energetic and economical aspects, leisure and safety aspects. Several questions have to be put forward which concern the transfrontier relations, the water rights, the problem of derivations, of Rhine river maintenance, the turbine and water depth warranty problems, the flow rate and the restoration of the Rhine island. All these questions must be tackled by the impact study. The implementation of a local procedure follow up made of a permanent technical working group and of a management committee is recommended. (J.S.)

  15. A Research Plan for Assessing the Power and Energy Capability of a River Network Under an Integrated Wind/Hydro-Electric Dispatchable Regime

    Science.gov (United States)

    Banka, John Czeslaw

    The world strives for more clean and renewable energy, but the amount of dispatchable energy in river networks is not accurately known and difficult to assess. When wind is integrated with water, the dispatchable yield can be greatly increased, but the uncertainty of the wind further degrades predictability. This thesis demonstrates how simulating the flows is a river network integrated with wind over a long time domain yields a solution. Time-shifting the freshet and pumped storage will ameliorate the seasonal summer drought; the risk of ice jams and uncontrolled flooding is reduced. An artificial market eliminates the issue of surplus energy from wind at night. Furthermore, this thesis shows how the necessary infrastructure can be built to accomplish the goals of the intended research. While specific to Northern Ontario and sensitive to the lives of the Native peoples living there, it indicates where the research might be applicable elsewhere in the world.

  16. Resurfacing Graphics

    Directory of Open Access Journals (Sweden)

    Prof. Patty K. Wongpakdee

    2013-06-01

    Full Text Available “Resurfacing Graphics” deals with the subject of unconventional design, with the purpose of engaging the viewer to experience the graphics beyond paper’s passive surface. Unconventional designs serve to reinvigorate people, whose senses are dulled by the typical, printed graphics, which bombard them each day. Today’s cutting-edge designers, illustrators and artists utilize graphics in a unique manner that allows for tactile interaction. Such works serve as valuable teaching models and encourage students to do the following: 1 investigate the trans-disciplines of art and technology; 2 appreciate that this approach can have a positive effect on the environment; 3 examine and research other approaches of design communications and 4 utilize new mediums to stretch the boundaries of artistic endeavor. This paper examines how visuals communicators are “Resurfacing Graphics” by using atypical surfaces and materials such as textile, wood, ceramics and even water. Such non-traditional transmissions of visual language serve to demonstrate student’s overreliance on paper as an outdated medium. With this exposure, students can become forward-thinking, eco-friendly, creative leaders by expanding their creative breadth and continuing the perpetual exploration for new ways to make their mark. 

  17. Resurfacing Graphics

    Directory of Open Access Journals (Sweden)

    Prof. Patty K. Wongpakdee

    2013-06-01

    Full Text Available “Resurfacing Graphics” deals with the subject of unconventional design, with the purpose of engaging the viewer to experience the graphics beyond paper’s passive surface. Unconventional designs serve to reinvigorate people, whose senses are dulled by the typical, printed graphics, which bombard them each day. Today’s cutting-edge designers, illustrators and artists utilize graphics in a unique manner that allows for tactile interaction. Such works serve as valuable teaching models and encourage students to do the following: 1 investigate the trans-disciplines of art and technology; 2 appreciate that this approach can have a positive effect on the environment; 3 examine and research other approaches of design communications and 4 utilize new mediums to stretch the boundaries of artistic endeavor. This paper examines how visuals communicators are “Resurfacing Graphics” by using atypical surfaces and materials such as textile, wood, ceramics and even water. Such non-traditional transmissions of visual language serve to demonstrate student’s overreliance on paper as an outdated medium. With this exposure, students can become forward-thinking, eco-friendly, creative leaders by expanding their creative breadth and continuing the perpetual exploration for new ways to make their mark.

  18. Low head hydro market assessment : main report : vol. 1

    International Nuclear Information System (INIS)

    2008-03-01

    Hydroelectric power is a predictable renewable energy source that produces no greenhouse gases (GHGs) and has low maintenance costs. In addition to river resources, low head hydro is available in sluice gates, irrigation canals, drinking water pressure release valves, and municipal wastewater outfalls. Canada's potential for low head hydro has been estimated at 5000 MW at 2000 different sites across the country. Sites of up to 50 MW have been identified in Ontario and Manitoba. This study performed a market assessment on low head hydro developments. Available and emerging technologies for developing low head hydro were identified. The economics of low head hydro in Canada were explored, and barriers to low head hydro development were identified. Strategies to promote low head hydro development were also explored, and the impact of different incentive types on the low head hydropower market were estimated using a simple economic model. It was concluded that a reduced, streamlined, and standardized environmental assessment process will significantly benefit low head hydro development in Canada. 5 refs., 14 tabs., 17 figs

  19. BC Hydro triple bottom line report 2002

    International Nuclear Information System (INIS)

    Anon

    2002-08-01

    British Columbia Hydro (BC Hydro) published this document which measures the environmental, social and economic performance of the company. It is a complement to BC Hydro's 2002 Annual Report. The report was prepared to better understand the company's business in terms of its commitment to being an environmentally, socially, and economically responsible company (the three bottom lines). BC Hydro proved its ability to integrate the three bottom lines in decision making processes by carefully examining the environmental, social and economical impacts of programs such as Power Smart, Green and Alternative Energy, and Water Use Planning. All indicators point to BC Hydro achieving its commitment of providing a minimum of 10 per cent of new demand through 2010 with new green energy sources. Water Use Plans were developed for hydroelectric generating stations, and they should all be in place by 2003. Efficiencies realised through the Power Smart program offset the increases in greenhouse gas associated with increased energy demand. Juvenile sturgeon raised in a hatchery were released into the Columbia River in May 2002. The completion of a 40-kilometre trail on the Sunshine Coast was helped by a financial contribution from BC Hydro in the amount of 23,000 dollars. Safety improvements were implemented at eight facilities, such as dam remediation, dam surveillance and instrumentation updates. Scholarships were awarded across the province, along with additional donations to non-profit organizations. Co-op positions were provided for 150 students. Internal energy efficiency programs were successful. Planning is under way for significant maintenance work and equipment replacement projects as the transmission and distribution infrastructure ages. The number of reported indicators was expanded this year. In turn, they were aligned with the revised Global Reporting Initiative (GRI) guidelines. tabs

  20. Provincial hydro expansions

    Energy Technology Data Exchange (ETDEWEB)

    Froschauer, K J

    1993-01-01

    A study of the development of five provincial hydroelectric utilities in Canada indicates that power companies and the state invited manufacturers to use hydroelectricity and natural resources in order to diversify provincial economies. These hydro expansions also show that utilities and government designed hydro projects to serve continental requirements; serving both objectives became problematic. It is argued that when the Canadian state and firms such as utilities use hydro expansions to serve both continentalism and industrialization, then at best they foster dependent industrialization and staple processing. At worst, they overbuild the infrastructure to generate provincial surplus energy for continental, rather than national, integration. Hydro developments became subject to state intervention in Canada mainly through the failures of private utilities to provide power for the less-lucrative industrial markets within provincial subregions. Although the state and utilities invited foreign firms to manufacture hydro equipment within the provinces and others to use electricity to diversify production beyond resource processing, such a diversification did not occur. Since 1962, ca 80% of industrial energy was used to semi-process wood-derived products, chemicals, and metals. The idea for a national power network became undermined by interprovincial political-economic factors and since 1963, the federal national/continential power policy prevailed. 187 refs., 6 figs., 52 tabs.

  1. Effects of the “Run-of-River” Hydro Scheme on Macroinvertebrate Communities and Habitat Conditions in a Mountain River of Northeastern China

    Directory of Open Access Journals (Sweden)

    Haoran Wang

    2016-01-01

    Full Text Available The main objective of this study was to quantify the impacts of the run of river (ROR scheme on the instream habitat and macroinvertebrate community. We sampled the macroinvertebrate assemblages and collected the habitat variables above and below an ROR hydropower plant: Aotou plant in the Hailang River, China. The effects of the ROR scheme on habitat conditions were examined using regulation-related variables, most of which, particularly the hydrological variables and substrate composition, presented spatial variations along the downstream direction, contributing to heterogeneous conditions between reaches. The macroinvertebrate richness, the density and the diversity metrics showed significant decreases in the “depleted” reach compared with the upper and lower reaches. Approximately 75% of reach-averaged densities and 50% of taxa richness suffered decreases in the “depleted” reach compared with the upper reach. Furthermore, functional feeding groups also showed distinct site differences along the channel. The relative abundance of both collector-gatherers and the scrapers reduced considerably at the “depleted” sites, particularly at the site immediately downstream of the weir. The total variance in the the functional feeding group (FFG data explained by Canonical correlation analysis (CCA was more than 81.4% and the high-loadings factors were depth, flow velocity, DO and substrate composition. We demonstrated that flow diversion at the 75% level and an in-channel barrier, due to the ROR scheme, are likely to lead to poor habitat conditions and decrease both the abundance and the diversity of macroinvertebrates in reaches influenced by water diversion.

  2. Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration: Hydro power flexibility for power systems

    Energy Technology Data Exchange (ETDEWEB)

    Huertas-Hernando, Daniel [Department of Energy Systems, SINTEF, Trondheim Norway; Farahmand, Hossein [Department of Electric Power Engineering, Norwegian University of Science and Technology (NTNU), Trondheim Norway; Holttinen, Hannele [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Kiviluoma, Juha [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Rinne, Erkka [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Söder, Lennart [Department of Electrical Engineering, KTH University, Stockholm Sweden; Milligan, Michael [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Ibanez, Eduardo [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Martínez, Sergio Martín [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Gomez-Lazaro, Emilio [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Estanqueiro, Ana [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Rodrigues, Luis [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Carr, Luis [Research Association for Energy Economics (FfE GmbH), Munich Germany; van Roon, Serafin [Research Association for Energy Economics (FfE GmbH), Munich Germany; Orths, Antje Gesa [Energinet.dk, Fredericia Denmark; Eriksen, Peter Børre [Energinet.dk, Fredericia Denmark; Forcione, Alain [Hydro Quebec, Montréal Canada; Menemenlis, Nickie [Hydro Quebec, Montréal Canada

    2016-06-20

    Hydro power is one of the most flexible sources of electricity production. Power systems with considerable amounts of flexible hydro power potentially offer easier integration of variable generation, e.g., wind and solar. However, there exist operational constraints to ensure mid-/long-term security of supply while keeping river flows and reservoirs levels within permitted limits. In order to properly assess the effective available hydro power flexibility and its value for storage, a detailed assessment of hydro power is essential. Due to the inherent uncertainty of the weather-dependent hydrological cycle, regulation constraints on the hydro system, and uncertainty of internal load as well as variable generation (wind and solar), this assessment is complex. Hence, it requires proper modeling of all the underlying interactions between hydro power and the power system, with a large share of other variable renewables. A summary of existing experience of wind integration in hydro-dominated power systems clearly points to strict simulation methodologies. Recommendations include requirements for techno-economic models to correctly assess strategies for hydro power and pumped storage dispatch. These models are based not only on seasonal water inflow variations but also on variable generation, and all these are in time horizons from very short term up to multiple years, depending on the studied system. Another important recommendation is to include a geographically detailed description of hydro power systems, rivers' flows, and reservoirs as well as grid topology and congestion.

  3. Small steps for hydro

    International Nuclear Information System (INIS)

    Wicke, Peter

    1998-01-01

    The government in Peru has decided to utilise its gas reserves and restrict hydro to relatively small schemes. A number of reasons for the decision are given. In 1997, the Shell-Mobile-Bechtel-COSAPI consortium was formed and agreements were signed regarding exploiting Gas de Camisea. The country's energy needs to 2010 are being assessed. It is likely that by 2001 the whole of south Peru will be receiving gas from Camisea. The Peru situation is discussed under the headings of (i) existing capacity, (ii) growing demands, (iii) a history of hydro in Peru, (iv) electrification and SHP and (v) outlook. The future for Peru's electric energy development is bright. While most of its new power capacity will come from natural gas, the small hydros also have a part to play. A stronger commitment of national and regional political authorities to consider supplies outside the big cities is said to be needed. (UK)

  4. Ontario Hydro decontamination experience

    Energy Technology Data Exchange (ETDEWEB)

    Lacy, C S; Patterson, R W; Upton, M S [Chemistry and Metallurgy Department, Central Production Services, Ontario Hydro, ON (Canada)

    1991-04-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  5. Ontario Hydro decontamination experience

    International Nuclear Information System (INIS)

    Lacy, C.S.; Patterson, R.W.; Upton, M.S.

    1991-01-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  6. Renewal of the small hydro power plant 'La Foulaz' on the river Orbe in Vallorbe, Switzerland; Rehabilitation de la petite centrale hydroelectrique de la Foulaz sur l'Orbe a Vallorbe. Etude d'avant projet - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Chenal, R.; Denis, V. [La Foulaz Energies SA, Vallorbe (Switzerland); Chuat, O. [RWB Eau et Environnement SA, Cernier (Switzerland)

    2009-08-15

    For now nearly four centuries, hydro power is used on the site named 'La Foulaz' on the river Orbe in the Vallorbe municipal territory. The existing small-scale hydro power plant is under neglect since 1970, although it enjoys a permanent water usage concession of 4.2 m{sup 3}/s. Since June 2008 the company 'La Foulaz Energie SA' owns the site and the water concession and is planning the renewal of the hydro power plant. The plan is to replace the existing permanent water flow rate usage concession by a higher water flow rate usage one of reasonable but limited duration. Reliable hydrological data are available from the Swiss Federal Administration as well as from the electricity utility 'Romande Energie SA' that operates the 'La Dernier' hydro power plant located up-stream. According to these data the design flow rate of 10 m{sup 3}/s has been selected for the new 'La Foulaz' plant. The available water head for the turbine is in the range 1.46 to 3-00 m, depending on the flow rate in the river Orbe. The average annual power production is estimated to 708,000 kWh. The peak electrical power would be 164 kW. With a cost recovery time of 25 years the production cost is estimated to 25 Swiss cents/kWh. This just enables to balance the budget. (author)

  7. Small hydro in Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2011-10-01

    Full Text Available hydro, the author has started an online database of small hydropower projects in eastern and southern Africa. The main aim of the database is to catalogue the current situation and to make that accessible to policymakers, project developers, as well...

  8. Design Graphics

    Science.gov (United States)

    1990-01-01

    A mathematician, David R. Hedgley, Jr. developed a computer program that considers whether a line in a graphic model of a three-dimensional object should or should not be visible. Known as the Hidden Line Computer Code, the program automatically removes superfluous lines and displays an object from a specific viewpoint, just as the human eye would see it. An example of how one company uses the program is the experience of Birdair which specializes in production of fabric skylights and stadium covers. The fabric called SHEERFILL is a Teflon coated fiberglass material developed in cooperation with DuPont Company. SHEERFILL glazed structures are either tension structures or air-supported tension structures. Both are formed by patterned fabric sheets supported by a steel or aluminum frame or cable network. Birdair uses the Hidden Line Computer Code, to illustrate a prospective structure to an architect or owner. The program generates a three- dimensional perspective with the hidden lines removed. This program is still used by Birdair and continues to be commercially available to the public.

  9. Printing--Graphic Arts--Graphic Communications

    Science.gov (United States)

    Hauenstein, A. Dean

    1975-01-01

    Recently, "graphic arts" has shifted from printing skills to a conceptual approach of production processes. "Graphic communications" must embrace the total system of communication through graphic media, to serve broad career education purposes; students taught concepts and principles can be flexible and adaptive. The author…

  10. Hydro turbines: An introduction

    International Nuclear Information System (INIS)

    Gordon, J.L.

    1993-01-01

    The various types of hydraulic turbines currently used in hydroelectric power plants are described. The descriptions are intended for use by non-engineers who are concerned with fish passage and fish mortality at a hydro power facility. Terminology used in the hydro industry is explained. Since the extent of cavitation is one of the factors affecting mortality rates of fish passing through hydraulic turbines, an equation is introduced which measures the extent of cavitation likely to be experienced in a turbine. An example of how the cavitation index can be calculated is provided for two typical power plants. The relation between certain parameters of power plant operation and the extent of cavitation, and therefore of fish mortality, is illustrated. 2 refs., 14 figs

  11. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Druce, D. [British Columbia Hydro, Vancouver, BC (Canada)

    2004-07-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs.

  12. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    International Nuclear Information System (INIS)

    Druce, D.

    2004-01-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs

  13. Nuclear reactors; graphical symbols

    International Nuclear Information System (INIS)

    1987-11-01

    This standard contains graphical symbols that reveal the type of nuclear reactor and is used to design graphical and technical presentations. Distinguishing features for nuclear reactors are laid down in graphical symbols. (orig.) [de

  14. The hydro digest

    Energy Technology Data Exchange (ETDEWEB)

    Scheil, Hermann [Itaipu Mondig, Power Generation Group (KWU), Siemens AG, Erlangen (Germany)

    2000-12-01

    Digest WK is an analysis and diagnostics system for turbine generators in large hydroelectric plant: it was developed from the Digest system which has been used in steam turbine plants for many years. The system is in use at the world's biggest hydro plant in Itaipu Binacional between Paraguay and Brazil. The system is described under the sub-headings of (a) monitoring concept; (b) the Digest WK system; (c) vibration monitoring; (d) generator temperature analysis and (e) outlook.

  15. Remote micro hydro

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    The micro-hydro project, built on a small tributary of Cowley Creek, near Whitehorse, Yukon, is an important step in the development of alternative energy sources and in conserving expensive diesel fuel. In addition to demonstrating the technical aspects of harnessing water power, the project paved the way for easier regulatory procedures. The power will be generated by a 9 meter head and a 6 inch crossflow turbine. The 36 V DC power will be stored in three 12 V batteries and converted to ac on demand by a 3,800 watt inverter. The system will produce 1.6 kW or 14,016 kWh per year with a firm flow of 1.26 cfs. This is sufficient to supply electricity for household needs and a wood working shop. The project is expected to cost about $18,000 and is more economical than tying into the present grid system, or continuing to use a gasoline generator. An environmental study determined that any impact of the project on the stream would be negligible. It is expected that no other water users will be affected by the project. This pilot project in micro-hydro applications will serve as a good indicator of the viability of this form of alternate energy in the Yukon. The calculations comparing the micro-hydro and grid system indicate that the mico-hydro system is a viable source of inflation-proof power. Higher heads and larger flow resulting in ac generation in excess of 10 kW would yield much better returns than this project. 3 tabs.

  16. Rural hydro technology

    International Nuclear Information System (INIS)

    Fowlie, M.

    1999-01-01

    This paper examines the increasing use of micro hydroelectric schemes for power generation in mountainous communities in Asia to alleviate some of the pressures on forests. An example of such a scheme in Pakistan is given, and the installation and operation of small hydro units, socio-economic factors, and the impact of the projects on the position of women in the community are discussed. (UK)

  17. Production method of hydrogen jet plasma process in hydro machinery

    International Nuclear Information System (INIS)

    Amini, F.

    2007-01-01

    The purpose of present paper is to the process of plasma formation in hydro machinery when a hydro turbine operates at various conditions and load rejection. By investigation the power, shock pressure , and impact effects of hydro machinery, it is revealed that energy and hydrogen are generated by the plasma process. The investigation on several turbines of various hydro power plants reveals that cold fusion process in hydro machinery generates hydrogen. The hypothesis concerning the participation of alkaline metals in river water and the atomic nuclei of the runner blade material in the formation of hydrogen are considered. It is possible to assume hydrogen, deuterium, helium, and tritium atoms (based on Dr. Mizuno and Dr. Kanarev theories) that are formed, diffuse into cavitation bubbles. The plasma is generated during the collapse of the bubble; thus, the quantity of burnt hydrogen determine the volume of generating hydrogen and the impact force caused by hydrogen explosion (noise).There are five main notions, which can determine hydrogen and plasma process: (1) turbine power effect, (2) high shock pressure, (3) crack on turbine parts, (4) impacts effects and (4) the lift of rotating parts. The frequency of the excitation lies in a range from 0.786 to 1.095 Hz.In future, it may be possible to design hydro turbines based on the plasma process that generates hydrogen; or there may exist turbines that rotate with a mixture of hydrogen explosion and water energies

  18. Hydro models and salmon recovery in the northwest

    International Nuclear Information System (INIS)

    Dragoon, K.

    1993-01-01

    Hydro regulation models provide extensive support for analyzing the efficacy of salmon recovery plans in the Northwest. Power planners developed these computer programs to help plan and efficiently operate a large multiple use river system. The models represent physical relationships and operational requirements on the system. They also simulate coordinated system operations for efficient power generation. These models are being pressed into service to provide data for fish recovery plans. They provide important information about hydro system capabilities and responses to recovery programs. However, the models cannot meet all of the analytical needs of fish biologists working toward salmon recovery

  19. Radioecological impact of effluents from a nuclear facility being decommissioned in the Antas river hydro graphic basin in the state of Minas Gerais, Brazil. Radioecological impact of effluents in the Antas reservoir

    International Nuclear Information System (INIS)

    Ronque, Leilane Barbosa; Azevedo, Heliana de; Lopes do Nascimento, Marcos Roberto; Roque, Claudio Vitor; Silva, Nivaldo Carlos da; Rodgher, Suzelei; Regali-Seleghim, Mirna Helena

    2008-01-01

    The Antas reservoir receives the treated effluents which come from acid drainage of uranium ore from the UTM-INB (Ore Treatment Unit - Brazilian Nuclear Industries), located in Caldas, Minas Gerais. This study was conducted in order to determine the possible environmental impact caused by discharge of the treated liquid effluent from the UTM into the Antas reservoir. Biological (ciliated protozoa and Peridinium sp. phytoflagellate) and physicochemical variables (manganese, zinc, sulfate, uranium, dissolved oxygen and temperature), trophic state and saprobity indexes were evaluated. Sampling in reservoir (Cab, P41, P14S, and P14F points) took place during the dry winter season (July 2006). Each day, samples were collected four times (6:00 am, 12:00 pm, 6:00 pm, and 12:00 am). Biological variables analyzed at the Antas reservoir classified it as an oligo trophic and beta-mesosaprobic environment. Chemical parameters indicate failures in the nuclear facility effluent treatment plant, showing that effluents outside of standard limits established by Brazilian current legislation for Class II water are being discharged at point P41. These results agree with biological analyses, since point P41 has the lowest diversity and biomass values for ciliated protozoa organisms, indicating possible environmental impacts on the ecosystem due to effluent discharge by this mining company.(author)

  20. Ontario Hydro annual report 1986

    Energy Technology Data Exchange (ETDEWEB)

    1987-04-01

    Ontario Hydro`s annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics.

  1. Hydro-energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Bacher, P. [Electricite de France (EDF), 75 - Paris (France); Tardieu, B. [Coyne et Bellier, 92 - Gennevilliers (France)

    2005-07-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  2. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Jackson, H.A.; Woodhead, L.W.; Fanjoy, G.R.

    1984-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations for the workers and the public

  3. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  4. HydroSHEDS: A global comprehensive hydrographic dataset

    Science.gov (United States)

    Wickel, B. A.; Lehner, B.; Sindorf, N.

    2007-12-01

    The Hydrological data and maps based on SHuttle Elevation Derivatives at multiple Scales (HydroSHEDS) is an innovative product that, for the first time, provides hydrographic information in a consistent and comprehensive format for regional and global-scale applications. HydroSHEDS offers a suite of geo-referenced data sets, including stream networks, watershed boundaries, drainage directions, and ancillary data layers such as flow accumulations, distances, and river topology information. The goal of developing HydroSHEDS was to generate key data layers to support regional and global watershed analyses, hydrological modeling, and freshwater conservation planning at a quality, resolution and extent that had previously been unachievable. Available resolutions range from 3 arc-second (approx. 90 meters at the equator) to 5 minute (approx. 10 km at the equator) with seamless near-global extent. HydroSHEDS is derived from elevation data of the Shuttle Radar Topography Mission (SRTM) at 3 arc-second resolution. The original SRTM data have been hydrologically conditioned using a sequence of automated procedures. Existing methods of data improvement and newly developed algorithms have been applied, including void filling, filtering, stream burning, and upscaling techniques. Manual corrections were made where necessary. Preliminary quality assessments indicate that the accuracy of HydroSHEDS significantly exceeds that of existing global watershed and river maps. HydroSHEDS was developed by the Conservation Science Program of the World Wildlife Fund (WWF) in partnership with the U.S. Geological Survey (USGS), the International Centre for Tropical Agriculture (CIAT), The Nature Conservancy (TNC), and the Center for Environmental Systems Research (CESR) of the University of Kassel, Germany.

  5. The different modes of hydro-economic analysis (Invited)

    Science.gov (United States)

    Harou, J. J.; Binions, O.; Erfani, T.

    2013-12-01

    In the face of growing water demands, climate change and spatial and temporal water access variability, accurately assessing the economic impacts of proposed water resource management changes is useful. The objective of this project funded by UK Water Industry Research was to present and demonstrate a framework for identifying and using the ';value of water' to enable water utilities and their regulators to make better decisions. A hydro-economic model can help evaluate water management options in terms of their hydrological and economic impact at different locations throughout a catchment over time. In this talk we discuss three modes in which hydro-economic models can be implemented: evaluative, behavioral and prescriptive. In evaluation mode economic water demand and benefit functions are used to post-process water resource management model results to assess the economic impacts (over space and time) of a policy under consideration. In behavioral hydro-economic models users are represented as agents and the economics is used to help predict their actions. In prescriptive mode optimization is used to find the most economically efficient management actions such as allocation patterns or source selection. These three types of hydro-economic analysis are demonstrated on a UK watershed (Great River Ouse) that includes 97 different water abstractors from amongst the public water supply, agriculture, industry and energy plant cooling sectors. The following issues under dry and normal historical conditions were investigated: Supply/demand investment planning, societal cost of environmental flows, water market prices, and scarcity-sensitive charges for water rights. The talk discusses which hydro-economic modeling mode is used to study each of these issues and why; example results are shown and discussed. The topic of how hydro-economic models can be built and deployed effectively is covered along with how existing water utility operational and planning tools can be

  6. PC Graphic file programing

    International Nuclear Information System (INIS)

    Yang, Jin Seok

    1993-04-01

    This book gives description of basic of graphic knowledge and understanding and realization of graphic file form. The first part deals with graphic with graphic data, store of graphic data and compress of data, programing language such as assembling, stack, compile and link of program and practice and debugging. The next part mentions graphic file form such as Mac paint file, GEM/IMG file, PCX file, GIF file, and TIFF file, consideration of hardware like mono screen driver and color screen driver in high speed, basic conception of dithering and conversion of formality.

  7. Hybrid Micro-Hydro Power Generation Development in Endau Rompin National Park Johor, Malaysia

    Directory of Open Access Journals (Sweden)

    Yusop Azli

    2017-01-01

    Full Text Available Micro-Hydro electrical power systems are very useful for remote area electrification which does not had supply from the national grid. On the contrary, this area has river streams with high potential for micro-hydro power generation. As such, the UTHM ECO-Hydro Team embarked on a project for erecting a micro-hydro power plant with collaboration with National Education Research Center (NERC, Johor National Park Corporation in Endau Rompin. The existing power generation in this area at present is by using diesel generator gives negative impact on finance and environment in the long run. It supplies power to several including library, offices, open laboratory, chalets and dorms.. At the moment, the micro-hydro system complements the diesel generator, thus becoming a hybrid power generation system.

  8. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    Jackson, H.A.

    1982-06-01

    In 1981 Ontario Hydro generated over 100 billion KWh of electrical energy. Approximately one third of this was from nuclear units. There are ten CANDU units (5 250 MW) currently in operation, and another twelve (8 600 MW) are under construction. The presently committed nuclear expansion program is estimated to involve expenditures of 16 billion dollars over the next 10 years. About 10 000 people are employed in the nuclear design and construction program. All projects are generally on schedule, with the stations coming into service during the following time periods: Pickering B, 1983-85; Bruce B, 1984-87; Darlington, 1988-90. The status of each project is reviewed. Planning is underway for some retubing projects, as early as 1985 for Pickering A

  9. Graphic Turbulence Guidance

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Forecast turbulence hazards identified by the Graphical Turbulence Guidance algorithm. The Graphical Turbulence Guidance product depicts mid-level and upper-level...

  10. Graphical Turbulence Guidance - Composite

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Forecast turbulence hazards identified by the Graphical Turbulence Guidance algorithm. The Graphical Turbulence Guidance product depicts mid-level and upper-level...

  11. Graphical Rasch models

    DEFF Research Database (Denmark)

    Kreiner, Svend; Christensen, Karl Bang

    Rasch models; Partial Credit models; Rating Scale models; Item bias; Differential item functioning; Local independence; Graphical models......Rasch models; Partial Credit models; Rating Scale models; Item bias; Differential item functioning; Local independence; Graphical models...

  12. Graphics in DAQSIM

    International Nuclear Information System (INIS)

    Wang, C.C.; Booth, A.W.; Chen, Y.M.; Botlo, M.

    1993-06-01

    At the Superconducting Super Collider Laboratory (SSCL) a tool called DAQSIM has been developed to study the behavior of Data Acquisition (DAQ) systems. This paper reports and discusses the graphics used in DAQSIM. DAQSIM graphics includes graphical user interface (GUI), animation, debugging, and control facilities. DAQSIM graphics not only provides a convenient DAQ simulation environment, it also serves as an efficient manager in simulation development and verification

  13. Bayesian Graphical Models

    DEFF Research Database (Denmark)

    Jensen, Finn Verner; Nielsen, Thomas Dyhre

    2016-01-01

    Mathematically, a Bayesian graphical model is a compact representation of the joint probability distribution for a set of variables. The most frequently used type of Bayesian graphical models are Bayesian networks. The structural part of a Bayesian graphical model is a graph consisting of nodes...

  14. The PC graphics handbook

    CERN Document Server

    Sanchez, Julio

    2003-01-01

    Part I - Graphics Fundamentals PC GRAPHICS OVERVIEW History and Evolution Short History of PC Video PS/2 Video Systems SuperVGA Graphics Coprocessors and Accelerators Graphics Applications State-of-the-Art in PC Graphics 3D Application Programming Interfaces POLYGONAL MODELING Vector and Raster Data Coordinate Systems Modeling with Polygons IMAGE TRANSFORMATIONS Matrix-based Representations Matrix Arithmetic 3D Transformations PROGRAMMING MATRIX TRANSFORMATIONS Numeric Data in Matrix Form Array Processing PROJECTIONS AND RENDERING Perspective The Rendering Pipeline LIGHTING AND SHADING Lightin

  15. Graphics gems II

    CERN Document Server

    Arvo, James

    1991-01-01

    Graphics Gems II is a collection of articles shared by a diverse group of people that reflect ideas and approaches in graphics programming which can benefit other computer graphics programmers.This volume presents techniques for doing well-known graphics operations faster or easier. The book contains chapters devoted to topics on two-dimensional and three-dimensional geometry and algorithms, image processing, frame buffer techniques, and ray tracing techniques. The radiosity approach, matrix techniques, and numerical and programming techniques are likewise discussed.Graphics artists and comput

  16. Hydro-Quebec looks south

    International Nuclear Information System (INIS)

    Ross, P.

    1997-01-01

    The recent introduction of Hydro-Quebec, the Canadian utility, into selling cheap electric power in the United States (US) deregulated power market is described, following applications to the US Federal Energy Regulatory Commission. As its prices are so much cheaper than its US competitors, it is expected that the company will soon have many willing customers across the USA. Hydro-Quebec will remain a publicly owned utility, but has experienced restructuring in order to meet this new competitive challenge. (UK)

  17. The Atlin Hydro Project : generation for generations

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, S. [Atlin Tlingit Development Corp., Atlin, BC (Canada)

    2010-07-01

    This presentation documented the step-by-step process by which the Atlin Hydro Project was developed. The Taku River Tlingit First Nation undertook the Atlin project as part of its vision for responsible resource management, sustainable economic development, and cultural revival. The Atlin Community Energy Plan involved an assessment of electricity demand, a 20-year demand projection, energy efficiency recommendations, and an assessment of power supply options such as wind towers, connection to the Yukon power grid, and hydro. The potential impact on fisheries, hydrology, wildlife habitat, roads and bridges, navigable waters and forests, existing rights, and First Nation archaeology were assessed, along with other factors such as hazards and flood control. A hydrology assessment of the Surprise-Pine Drainage Basin was undertaken, and stream-flow measurements were taken near the intake location on Pine Creek. The project comprises a discharge control structure and a fish ladder; an intake and weir on Pine Creek; a penstock pipeline from intake to powerhouse; a powerhouse with a 2.1 MW Pelton turbine generator and a switch yard; and a power line from the powerhouse to the interconnection with the existing grid. The impacts on fisheries, wildlife, and human movement are expected to be minimal. 28 figs., 3 tabs.

  18. Hydro Power Reservoir Aggregation via Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Markus Löschenbrand

    2017-12-01

    Full Text Available Electrical power systems with a high share of hydro power in their generation portfolio tend to display distinct behavior. Low generation cost and the possibility of peak shaving create a high amount of flexibility. However, stochastic influences such as precipitation and external market effects create uncertainty and thus establish a wide range of potential outcomes. Therefore, optimal generation scheduling is a key factor to successful operation of hydro power dominated systems. This paper aims to bridge the gap between scheduling on large-scale (e.g., national and small scale (e.g., a single river basin levels, by applying a multi-objective master/sub-problem framework supported by genetic algorithms. A real-life case study from southern Norway is used to assess the validity of the method and give a proof of concept. The introduced method can be applied to efficiently integrate complex stochastic sub-models into Virtual Power Plants and thus reduce the computational complexity of large-scale models whilst minimizing the loss of information.

  19. Hydro-mechanical processes

    Energy Technology Data Exchange (ETDEWEB)

    Laouafa, F.; Kazmierczak, J.B. [Institut National de l' Environnement Industriel et des Risques (INERIS), Parc Technologique ALATA, 60 - Verneuil en Halatte (France); Armand, G. [Agence Nationale pour la Gestion des Dechets Radioactifs, Lab. de Souterrain de Meuse/Haute-Marne, 55 - Bure (France); Vaunat, J. [Catalonia UPC- Technical Univ., Barcelona (Spain); Jobmann, M.; Polster, M. [DBETEC- DBE Technology GmbH, Peine (Germany); Su, K.; Lebon, P.; Plas, F.; Armand, G.; Abou-Chakra Guery, A.; Cormery, F.; Shao, J.F.; Kondo, D. [ANDRA - Agence Nationale pour la Gestion des Dechets Radioactifs, 92 - Chatenay Malabry (France); Souley, M. [Institut National de l' Environnement Industriel et des Risques (INERIS), 54 - Nancy (France); Coll, C.; Charlier, R.; Collin, F.; Gerard, P. [Liege Univ., Dept. ArGEnCo (Belgium); Xiang Ling, Li [ESV EURIDICE, SCK.CEN, Belgian Nuclear Research Centre, Mol (Belgium); Collin, F. [Liege Univ., Charge de Recherches FNRS (Belgium); Pellet, F.L.; Fabre, G. [University Joseph Fourier, Laboratory 3S-R, 38 - Grenoble (France); Garcia-Sineriz, J.L.; Rey, M. [AITEMIN - Asociacion para la Investigacion y Desarrollo Industrial de los Recursos Naturales, Madrid (Spain); Mayor, J.C. [ENRESA - Empresa Nacional des Residuos Radioactivos, Madrid (Spain); Castellanos, E.; Romero, E.; Lloret, A.; Gens, A. [Catalunya Univ. Politecnica, UPC (Spain); Villar, M.V. [CIEMAT - Centro de Investigaciones Energeticas, Medioambientales y Tecnologicas, Madrid (Spain); Chambon, R. [Laboratoire 3S, UJF-INPG-CNRS, 38 - Grenoble (France); Czaikowski, O.; Lux, K.H. [Clausthal Univ. of Technology, Professorship for Waste Disposal and Geomechanics, Clausthal-Zellerfeld (Germany); Van Geet, M.; Bastiaens, W.; Volckaert, G.; Weetjens, E.; Sillen, X. [SCK-CEN, Waste and Disposal dept., Mol (Belgium); ONDRAF/NIRAS, Brussel (Belgium); Imbert, Ch. [CEA Saclay, Dept. de Physico-Chimie (DPC/SCCME/LECBA), 91 - Gif sur Yvette (France)] [and others

    2007-07-01

    This session gathers 13 articles dealing with: three-dimensional and time stepping modelling of the whole Meuse/Haute-Marne ANDRA URL (F. Laouafa, J.B. Kazmierczak, G. Armand, J. Vaunat, M. Jobmann, M. Polster); a constitutive model for a deep argillaceous rock using Hoek-Brown criteria (K. Su, C. Chavant, M. Souley); the long term behaviour of the Boom clay: influence of viscosity on the pore pressure distribution (C. Coll, R. Charlier, X.L. Li, F. Collin); the microstructural changes induced by viscoplastic deformations in argillaceous rocks (F.L. Pellet, G. Fabre, K. Su, P. Lebon); the engineered barrier experiment at Mont Terri rock laboratory (J.L. Garcia-Sineriz, M. Rey, J.C. Mayor); the chemical influence on the Hydro-Mechanical behaviour of high-density FEBEX bentonite (E. Castellanos, M.V. Villar, E. Romero, A. Lloret, A. Gens); the influence of water exchanges on the gallery convergence (P. Gerard, R. Charlier, R. Chambon, F. Collin); a new method for ageing resistant storage of argillaceous rock samples to achieve reproducible experimental results even after long intermediate storage times (O. Czaikowski, K.H. Lux); the installation and evaluation of a large-scale in-situ shaft seal experiment in Boom clay the RESEAL project M. Van Geet, W. Bastiaens, G. Volckaert, E. Weetjens, X. Sillen, A. Gens, M.V. Villar, Ch. Imbert, M. Filippi, F. Plas); the hydro-Mechanical response of the Callovo-Oxfordian mud-stone around a deep vertical drift (J. Vaunat, B. Garitte, A. Gens, K. Su, G. Armand); the sensitivity of total stress to changes in externally applied water pressure in KBS-3 buffer bentonite (J.F. Harrington, D.J. Birchall, P. Sellin); the comparison of the poro-elastic behavior of Meuse/Haute Marne and Tournemire argillites: effect of loading and saturation states (E. Bemer, A. Noiret, F. Homand, A. Rejeb); and the multi-scale modelling of the argillites mechanical behaviour (A. Abou-Chakra Guery, F. Cormery, K. Su, J.F. Shao, D. Kondo)

  20. Visual graphics for human rights, social justice, democracy and the ...

    African Journals Online (AJOL)

    Keywords: art, democracy, human rights, social justice, the public good, visual graphics. Introduction ..... in industry and global communications pay scant regard to their effect on the environment. The ..... Upper Saddle River, NJ: Pearson/Merril.

  1. Large scale hydro-economic modelling for policy support

    Science.gov (United States)

    de Roo, Ad; Burek, Peter; Bouraoui, Faycal; Reynaud, Arnaud; Udias, Angel; Pistocchi, Alberto; Lanzanova, Denis; Trichakis, Ioannis; Beck, Hylke; Bernhard, Jeroen

    2014-05-01

    To support European Union water policy making and policy monitoring, a hydro-economic modelling environment has been developed to assess optimum combinations of water retention measures, water savings measures, and nutrient reduction measures for continental Europe. This modelling environment consists of linking the agricultural CAPRI model, the LUMP land use model, the LISFLOOD water quantity model, the EPIC water quality model, the LISQUAL combined water quantity, quality and hydro-economic model, and a multi-criteria optimisation routine. With this modelling environment, river basin scale simulations are carried out to assess the effects of water-retention measures, water-saving measures, and nutrient-reduction measures on several hydro-chemical indicators, such as the Water Exploitation Index (WEI), Nitrate and Phosphate concentrations in rivers, the 50-year return period river discharge as an indicator for flooding, and economic losses due to water scarcity for the agricultural sector, the manufacturing-industry sector, the energy-production sector and the domestic sector, as well as the economic loss due to flood damage. Recently, this model environment is being extended with a groundwater model to evaluate the effects of measures on the average groundwater table and available resources. Also, water allocation rules are addressed, while having environmental flow included as a minimum requirement for the environment. Economic functions are currently being updated as well. Recent development and examples will be shown and discussed, as well as open challenges.

  2. Graphical Models with R

    DEFF Research Database (Denmark)

    Højsgaard, Søren; Edwards, David; Lauritzen, Steffen

    Graphical models in their modern form have been around since the late 1970s and appear today in many areas of the sciences. Along with the ongoing developments of graphical models, a number of different graphical modeling software programs have been written over the years. In recent years many...... of these software developments have taken place within the R community, either in the form of new packages or by providing an R ingerface to existing software. This book attempts to give the reader a gentle introduction to graphical modeling using R and the main features of some of these packages. In addition......, the book provides examples of how more advanced aspects of graphical modeling can be represented and handled within R. Topics covered in the seven chapters include graphical models for contingency tables, Gaussian and mixed graphical models, Bayesian networks and modeling high dimensional data...

  3. Impact on the aquatic environment of hydro-peaking in hydroelectric plants

    International Nuclear Information System (INIS)

    Sabaton, C.; Lauters, F.; Valentin, S.

    1996-01-01

    There are a number of types of hydroelectric installations on French rivers. Some of these intermittently turbine water stored in dammed reservoirs, in order to use available reserves at the most opportune moment for power generation. These plants, run under 'hydro-peaking' management procedures, cause variations in discharge in river sections downstream of the restitution, on a daily or weekly scale. To answer questions concerning the impact of such variations in discharge on the aquatic environment, EDF launched a research program aimed at describing and better understanding the physical and biological phenomena related to hydro-peaking and assessing the possible impact of this type of plant management on French streams. Seven sites subjects to hydro-peaking were studied on rivers with mean flow rates lower than 20 m 3 /s (which corresponds to over 65 % of EDF hydro-peaking sites). Four themes in particular were examined: hydraulic characterization of hydro-peaking, modifications in thermal regime and water quality, response of benthic invertebrates and response of fish populations to hydro-peaking. For fish as well as for invertebrates, the role of the base discharge - in the absence of peaking flow - and that of the morphology of the river bed (and, in particular, the presence of shelter for fish) during periods of strong discharge were clearly highlighted. Impact assessment requires a precise diagnosis of the state of biocenoses. To carry out such a diagnosis, one must reason in terms of species, life phase (particularly the most sensitive phases) and population structure as well as the type of stream and the faunizone involved. A risk assessment is possible by means of simultaneous study of the morphology of the river bed and the response of the signal generated by hydro-peaking in terms of hydrology and physical characteristics downstream of the restitution. (authors)

  4. Statistical assessment of fish behavior from split-beam hydro-acoustic sampling

    International Nuclear Information System (INIS)

    McKinstry, Craig A.; Simmons, Mary Ann; Simmons, Carver S.; Johnson, Robert L.

    2005-01-01

    Statistical methods are presented for using echo-traces from split-beam hydro-acoustic sampling to assess fish behavior in response to a stimulus. The data presented are from a study designed to assess the response of free-ranging, lake-resident fish, primarily kokanee (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) to high intensity strobe lights, and was conducted at Grand Coulee Dam on the Columbia River in Northern Washington State. The lights were deployed immediately upstream from the turbine intakes, in a region exposed to daily alternating periods of high and low flows. The study design included five down-looking split-beam transducers positioned in a line at incremental distances upstream from the strobe lights, and treatments applied in randomized pseudo-replicate blocks. Statistical methods included the use of odds-ratios from fitted loglinear models. Fish-track velocity vectors were modeled using circular probability distributions. Both analyses are depicted graphically. Study results suggest large increases of fish activity in the presence of the strobe lights, most notably at night and during periods of low flow. The lights also induced notable bimodality in the angular distributions of the fish track velocity vectors. Statistical/SUMmaries are presented along with interpretations on fish behavior

  5. Hydro investment analysis under new market conditions

    Energy Technology Data Exchange (ETDEWEB)

    Doorman, Gerard

    2010-07-01

    Full text: A future energy system with stronger coupling to Europe and with an increased share of non-regulated renewables will lead to increasing variability of the demand faced by the hydro system. In a market based system these variations will be reflected by larger daily price variations, both in the Elspot day ahead market, the Elbas intraday market and in the balancing market. With its unique regulation capabilities, hydro power will be very well positioned to handle these variations. However, existing model concepts for long term hydro scheduling were not developed for this framework, and do not take the new market conditions into account to a sufficient degree. Therefore hydro scheduling tools used for upgrading and investment analysis as well as analysing consequences of new environmental demands need adaptation to a finer temporal resolution, and to perform optimisation under varying constraints and uncertain input data for inflow and electricity prices. Focus is on investment analysis for a river system or power producer. Existing models can be grouped in the long-term (scheduling models with a time horizon up to 5 years) EOPS (Vansimtap), EOPS-ST (SimtapEffekt) and ProdRisk, and the shortterm scheduling models with a typical time horizon up to a few weeks, but focus on 1-2 days (SHOP and ID-SIM). A perfect tool in the present context would combine the properties of the long term stochastic optimisation models with the modelling details of SHOP and/or ID-SIM. However, this is probably not possible and simplifications will be necessary. Some important deficiencies in the present long term models are: Insufficiently realistic plant models in the relevant optimization models; Time delays are not handled; Handing of flexible / state dependent constraints; Handling of ramping constraints; Modelling of the cost of frequent regulations (wear and tear); Reserve markets As a result of these deficiencies the investment analysis does not adequately assess the value

  6. Deterministic Graphical Games Revisited

    DEFF Research Database (Denmark)

    Andersson, Daniel; Hansen, Kristoffer Arnsfelt; Miltersen, Peter Bro

    2008-01-01

    We revisit the deterministic graphical games of Washburn. A deterministic graphical game can be described as a simple stochastic game (a notion due to Anne Condon), except that we allow arbitrary real payoffs but disallow moves of chance. We study the complexity of solving deterministic graphical...... games and obtain an almost-linear time comparison-based algorithm for computing an equilibrium of such a game. The existence of a linear time comparison-based algorithm remains an open problem....

  7. EASI graphics - Version II

    International Nuclear Information System (INIS)

    Allensworth, J.A.

    1984-04-01

    EASI (Estimate of Adversary Sequence Interruption) is an analytical technique for measuring the effectiveness of physical protection systems. EASI Graphics is a computer graphics extension of EASI which provides a capability for performing sensitivity and trade-off analyses of the parameters of a physical protection system. This document reports on the implementation of the Version II of EASI Graphics and illustrates its application with some examples. 5 references, 15 figures, 6 tables

  8. Graphical Models with R

    CERN Document Server

    Højsgaard, Søren; Lauritzen, Steffen

    2012-01-01

    Graphical models in their modern form have been around since the late 1970s and appear today in many areas of the sciences. Along with the ongoing developments of graphical models, a number of different graphical modeling software programs have been written over the years. In recent years many of these software developments have taken place within the R community, either in the form of new packages or by providing an R interface to existing software. This book attempts to give the reader a gentle introduction to graphical modeling using R and the main features of some of these packages. In add

  9. The computer graphics metafile

    CERN Document Server

    Henderson, LR; Shepherd, B; Arnold, D B

    1990-01-01

    The Computer Graphics Metafile deals with the Computer Graphics Metafile (CGM) standard and covers topics ranging from the structure and contents of a metafile to CGM functionality, metafile elements, and real-world applications of CGM. Binary Encoding, Character Encoding, application profiles, and implementations are also discussed. This book is comprised of 18 chapters divided into five sections and begins with an overview of the CGM standard and how it can meet some of the requirements for storage of graphical data within a graphics system or application environment. The reader is then intr

  10. The computer graphics interface

    CERN Document Server

    Steinbrugge Chauveau, Karla; Niles Reed, Theodore; Shepherd, B

    2014-01-01

    The Computer Graphics Interface provides a concise discussion of computer graphics interface (CGI) standards. The title is comprised of seven chapters that cover the concepts of the CGI standard. Figures and examples are also included. The first chapter provides a general overview of CGI; this chapter covers graphics standards, functional specifications, and syntactic interfaces. Next, the book discusses the basic concepts of CGI, such as inquiry, profiles, and registration. The third chapter covers the CGI concepts and functions, while the fourth chapter deals with the concept of graphic obje

  11. Ontario Hydro annual report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    Ontario Hydro is a corporation without share capital created by a special statute of the Province of Ontario in 1906. It now operates under the authority of the Power Corporation Act, R.S.O. 1980, Chapter 384, as amended, with broad powers to generate, supply and deliver electric power throughout the province. It is also authorized to produce and sell steam and hot water as primary products. The Corporation's prime objective is to supply the people of Ontario with electricity at the lowest feasible cost consistent with high safety and quality of service standards. Ontario Hydro's main activity is wholesaling electric power to municipal utilities in urban areas who, in turn, retail it to customers in their service areas. In 1985, approximately 3,166,000 customers were served by Ontario Hydro and the municipal utilities in the province. Ontario Hydro operates 81 hydraulic, fossil and nuclear generating stations and an extensive power grid across Ontario to meet the province's demands for electric energy. Interconnections with other systems place the Corporation in an extensive electrical grid that covers a large segment of the North American continent. Ontario Hydro is a financially self-sustaining corporation. The Province of Ontario guarantees bonds and notes issued to the public by the Corporation

  12. Hydro One 2002 annual report

    International Nuclear Information System (INIS)

    2003-01-01

    Financial information from Hydro One was presented and a review of its 2002 operations was made available for the benefit of shareholders. Hydro One is the largest electricity delivery company in Ontario and one of the largest in North America. It began operation in 1999 after Ontario Hydro restructured its delivery and generation entities. Hydro One now includes power transmission, power distribution and telecom, with transmission and distribution operations representing 99 per cent of its business. This report indicates that in 2002, the utility had strong financial performance with $344 million in net income. The utility met its health and safety targets, and established a customer advisory board to improve customer satisfaction. A layer of management at the executive level was eliminated to stream-line decision-making and enhance productivity. The electricity network was upgraded and maintained through $546 million in capital expenditures. Non-core functions were sold to ensure a better focus on the core business of electricity delivery. This report presents an operations review as well as consolidated financial statements and common share information including the accounts of Hydro One and its share of assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  13. Economically viable and environment-friendly hydro energy in Estonia

    International Nuclear Information System (INIS)

    Saks, Ants; Velner, Harald

    2001-01-01

    Hydro energy has been in oblivion in Estonia for about 30 years now. During the 1960s, most of Estonia's small hydropower plants were closed down, just as it was done in the whole Soviet Union. As the only larger hydro plant, the 125 MW plant in Narva, was situated on the Russian side of the Narva River, there were only two or three small hydro plants left. Even those were exploited at low capacity and mainly for heating the buildings. It was not until the 1990s that a number of enthusiasts started to re-establish the hydro plants by reconstructing old installations. The pre-feasibility study 'Hydropower in Estonia' proposed by Estonian and Swedish experts, showed that the restoration of the hydropower plants and watermills is economically feasible and technically possible if advanced technology is used. Hydropower as an alternative ('green') energy source should be used in the best technical-economical way. The first pilot plant in Estonia, the 200 kW Kamari plant was constructed in 1998 with compact-propeller units, in co-operation with Waterpumps WP Oy and ABB. Today, ten new plants have been constructed or are under construction. Hydropower plants/watermills should be reconstructed in accordance with the legislative acts on environment protection

  14. The Hill Chart Calculation for Pelton Runner Models using the HydroHillChart - Pelton Module Software

    Directory of Open Access Journals (Sweden)

    Adelina Bostan

    2015-07-01

    Full Text Available The Pelton turbines industrial design is based on the hill chart characteristics obtained by measuring the models. Primary data measurements used to obtain the hill chart can be processed graphically, by hand or by using graphic programs respectively CAD programs; the HydroHillChart - Pelton module software is a specialized tool in achieving the hill chart, using interpolation cubic spline functions. Thereby, based on measurements of several models of Pelton turbines, a computerized library, used to design industrial Pelton turbines can be created. The paper presents the universal characteristics calculated by using the HydroHillChart - Pelton module software for a series of Pelton runners.

  15. Himalayan hydro on the horizon

    International Nuclear Information System (INIS)

    Sharp, Timothy

    2000-01-01

    The prospects for development of hydro in the Himalayas has been enhanced by privatisation and the urgent need for clean electricity in the north of India. There are various hurdles to be overcome before the projects are likely to move forward in earnest before 2005, and these are mentioned. The demand for electricity in India is said to be enormous. At present, there is much polluting industry along the Himalayas. As throughout the Indian privatisation dilemma, the critical issues for development of Himalayan hydro come down to credible commercial power markets and finance. With regard to finance and administrative changes, the Indian government is carrying out a number of actions and these are itemised. The US is vigorously promoting the development of Himalayan hydro as a key to much needed regional co-operation and the World Bank is supportive

  16. The political economy of Canadian hydro-electricity : between old provincial hydros and neoliberal regional energy regimes

    International Nuclear Information System (INIS)

    Netherton, A.

    2007-01-01

    In economic terms, hydro-electricity is considered as a quasi-staple, as it prone to the classic staples problem of excess capacity. However, neither water nor hydroelectricity in Canada is produced primarily for export markets. Hydroelectric systems are often thought of as politicized monopolies. This paper discussed changes that have occurred in hydroelectric organizations over time, as they have been governed by a formative mixed regime; postwar provincial hydro systems; a megaprojects regime; and an emerging sustainability regionalization regime. The origins of electricity generation and transmission in Canada were discussed, as well as the ecological footprint of large mega-projects on rivers. The development of provincial hydro monopolies during the mid- to late- twentieth century was also outlined, as well as the sustainability and regionalization regime that developed after 1990. During the mature staples period of the mid-century, rents in hydro-electric organizations were distributed through cheap rates to subsidize and facilitate the development of mass production and mass consumption. However, post-staples consumption has now replaced mass consumption, and demand side management is replacing earlier cheap power policies. Nonetheless, the lack of systematic integration of networks has led to inefficiencies. Provincial grids are now being integrated into interconnected North American regional networks regulated by the United States. It was concluded that the Canadian electricity regime is increasingly influenced by the the supranational role that the United States is playing in structuring markets. 83 refs

  17. Climate influences on upper Limpopo River flow

    African Journals Online (AJOL)

    2016-01-01

    Jan 1, 2016 ... Keywords: Limpopo Valley, hydro-meteorology, surface water deficit. * To whom all ... millenia and there is a history of drought impacts on vegetation. (Ekblom et ... water budget of the upper Limpopo River valley using direct.

  18. Fixing hydro - The forgotten renewable

    International Nuclear Information System (INIS)

    Nalder, N.

    1992-01-01

    Since the dawn of civilization, man has captured the energy potential of falling water, from the water wheels in the fertile crescent of ancient times to today's highly sophisticated conventional and pumped storage projects. As we approach the 21st century, electric energy captured from falling water provides 2.0 trillion kilowatt-hours (21.23 quadrillion Btu), roughly 20% of the world's electric energy. Of the 2.56 billion kilowatts of the world's installed electric generating capacity, hydropower accounts for 24%. Between 1980 and 1989, world generation of hydroelectric power rose from 1.7 trillion kWh to 2.0 trillion kWh. As of January 1, 1988, the US has 90.5 million kW of installed hydro capacity - 70.8 million kW of it under license by the Federal Energy Regulatory Commission - with annual generation estimated at just under 300 billion kWh. Hydro's share, which not long ago comprised 13% of the nation's total capacity, now is just a 9% share. The US has the option to choose one or another path for hydro. If policy makers are willing to coast on a cushion of cheap natural gas, they will continue to shun hydro and put obstacles in its path. But if they come to regard hydro as an attractive resource - as they did only recently - economically and environmentally, they will encourage more balance in resource policies. Believing that interest in a balanced national resource portfolio will grow, the author reviews the past and suggests a possible future course of reasonable development for hydro. The article concludes with some suggested principles that will be needed if the appropriate balance is to be found

  19. Interactive Graphic Journalism

    NARCIS (Netherlands)

    Schlichting, Laura

    2016-01-01

    textabstractThis paper examines graphic journalism (GJ) in a transmedial context, and argues that transmedial graphic journalism (TMGJ) is an important and fruitful new form of visual storytelling, that will re-invigorate the field of journalism, as it steadily tests out and plays with new media,

  20. Mathematics for computer graphics

    CERN Document Server

    Vince, John

    2006-01-01

    Helps you understand the mathematical ideas used in computer animation, virtual reality, CAD, and other areas of computer graphics. This work also helps you to rediscover the mathematical techniques required to solve problems and design computer programs for computer graphic applications

  1. Graphic Communications. Curriculum Guide.

    Science.gov (United States)

    North Dakota State Board for Vocational Education, Bismarck.

    This guide provides the basic foundation to develop a one-semester course based on the cluster concept, graphic communications. One of a set of six guides for an industrial arts curriculum at the junior high school level, it suggests exploratory experiences designed to (1) develop an awareness and understanding of the drafting and graphic arts…

  2. Strategies for growth of hydro electric power

    International Nuclear Information System (INIS)

    Khera, D.V.

    1998-01-01

    Hydro power on account of its several inherent advantages has a key role to play in the development of long term energy strategies based on diversified and balance use of natural national resources. Our country is fortunate to be endowed with large hydro-electric potential. It is estimated that the hydro potential while fully developed may yield to an installed capacity of 1,50,000 MW. An attempt has been made in this paper to examine and analyse the status and trend of hydro power development, need for accelerated development of hydro power, myths about hydro electric projects, principal causes responsible for scaling down of hydro share in the total installed capacity and strategies which could restore optimum hydro thermal mix. (author)

  3. Ontario Hydro looks at security

    International Nuclear Information System (INIS)

    Green, B.J.; Kee, B.

    1995-01-01

    Ontario Hydro operates 20 CANDU reactors on three different sites. Since 1984, a review of security arrangements on all the sites has taken place on a five-yearly basis. The review process for 1995 is outlined. The three objectives were as follows: to assess current security threats and risks to the stations; to assess the adequacy of the existing programme to protect against current threats; by comparing the security programme against those of comparable entities to establish benchmarks for good practice as a basis for improvements at Ontario Hydro. Valuable insights gained through the review are listed. These could be useful to other utilities. (UK)

  4. Hydro-Quebec's environmental policy

    International Nuclear Information System (INIS)

    1996-10-01

    Hydro-Quebec established a new environmental policy on August 1, 1996. A summary of the policy was presented. According to this policy statement the utility undertakes to recognize the environmental implications of its activities and assumes responsibilities for these implications by integrating them into its corporate decision-making processes. The following general principles and means of implementation have been highlighted: (1) sustainable development, (2) strict, responsible environmental management, (3) environmental research, (4) enhancement of activities and facilities, (5) information, consultation and dialogue, and (6) environmental responsibility of Hydro-Quebec personnel, subsidiaries and business partners

  5. Hydro-Quebec is profitable

    International Nuclear Information System (INIS)

    Poirier, M.

    1997-01-01

    The pros and cons of the potential privatisation of Hydro-Quebec were discussed. A brief review of charges of less than competent management, low profitability and the corporation's recent administrative restructuring was presented. The general thrust of the argument was that Hydro-Quebec plays a crucial role in the economic development of Quebec, it can be made to be more profitable and that for the good of Quebec it should continue as a public corporation under the control of the provincial government

  6. Operational and structural measures to reduce hydro-peaking impact on fish larvae

    International Nuclear Information System (INIS)

    Kopecki, Ianina; Schneider, Matthias

    2016-01-01

    Eco-hydraulic investigations studying the effects of hydro-peaking on river biota are gaining in importance. Negative effects of rapid flow fluctuations due to hydro power production are well documented by many studies, with the larvae and juvenile fish identified among the mostly affected life stages. Therefore, elaboration of efficient hydro-peaking mitigation strategies is an important issue for energy companies as well as for water body administrations responsible for the fulfilment of WFD requirements. The present case study strives for practical solutions allowing to minimize or compensate the negative effects of hydro-peaking on the fish fauna of the 7 km long river reach on the river Lech (southern Germany). Model based investigations allow to access the impact from currently authorized discharge regime, suggest operational and structural measures within the reach in terms of reducing the risk of stranding for fish larvae and select the measures most easy to implement and with the largest ecological benefit. The paper describes the approach for accessing the effects of hydro-peaking based on 2D hydrodynamic modelling, fuzzy logic based habitat modelling and information on cutting-edge biological investigations on fish larvae from Lunz experimental facility (Austria). (authors)

  7. Ontario Hydro statistical yearbook 1990

    International Nuclear Information System (INIS)

    1990-01-01

    Ontario Hydro was created in 1906 by a special statute of the Province of Ontario. It is a financially self-sustaining corporation without share capital. The yearbook is a compilation of financial data detailed by financial statements and sales and revenue figures for the year 1990. It is broken down by municipalities served in Ontario

  8. The hydro energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Vachey, C.

    2000-05-01

    This paper is a first approach of the hydro energy energy. It presents the principle and the applications of this energy source. It proposes recommendations on the sizing and the cost estimation of an installation and the environmental impacts of this energy. (A.L.B.)

  9. Ontario Hydro annual report 1975

    International Nuclear Information System (INIS)

    A financial report and statistics on Ontario energy demand are presented. Efforts to secure a reliable supply of coal and uranium are described. Ontario Hydro's expansion is now controlled by capital availability and not power demand, and this has affected 11 construction projects, including heavy water plants and nuclear generating stations. (E.C.B.)

  10. Ontario Hydro annual report 1986

    International Nuclear Information System (INIS)

    1987-04-01

    Ontario Hydro's annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics

  11. Ontario Hydro statistical yearbook 1990

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-12-31

    Ontario Hydro was created in 1906 by a special statute of the Province of Ontario. It is a financially self-sustaining corporation without share capital. The yearbook is a compilation of financial data detailed by financial statements and sales and revenue figures for the year 1990. It is broken down by municipalities served in Ontario.

  12. Perception in statistical graphics

    Science.gov (United States)

    VanderPlas, Susan Ruth

    There has been quite a bit of research on statistical graphics and visualization, generally focused on new types of graphics, new software to create graphics, interactivity, and usability studies. Our ability to interpret and use statistical graphics hinges on the interface between the graph itself and the brain that perceives and interprets it, and there is substantially less research on the interplay between graph, eye, brain, and mind than is sufficient to understand the nature of these relationships. The goal of the work presented here is to further explore the interplay between a static graph, the translation of that graph from paper to mental representation (the journey from eye to brain), and the mental processes that operate on that graph once it is transferred into memory (mind). Understanding the perception of statistical graphics should allow researchers to create more effective graphs which produce fewer distortions and viewer errors while reducing the cognitive load necessary to understand the information presented in the graph. Taken together, these experiments should lay a foundation for exploring the perception of statistical graphics. There has been considerable research into the accuracy of numerical judgments viewers make from graphs, and these studies are useful, but it is more effective to understand how errors in these judgments occur so that the root cause of the error can be addressed directly. Understanding how visual reasoning relates to the ability to make judgments from graphs allows us to tailor graphics to particular target audiences. In addition, understanding the hierarchy of salient features in statistical graphics allows us to clearly communicate the important message from data or statistical models by constructing graphics which are designed specifically for the perceptual system.

  13. Multifractal Conceptualisation of Hydro-Meteorological Extremes

    Science.gov (United States)

    Tchiguirinskaia, I.; Schertzer, D.; Lovejoy, S.

    2009-04-01

    Hydrology and more generally sciences involved in water resources management, technological or operational developments face a fundamental difficulty: the extreme variability of hydro-meteorological fields. It clearly appears today that this variability is a function of the observation scale and yield hydro-meteorological hazards. Throughout the world, the development of multifractal theory offers new techniques for handling such non-classical variability over wide ranges of time and space scales. The resulting stochastic simulations with a very limited number of parameters well reproduce the long range dependencies and the clustering of rainfall extremes often yielding fat tailed (i.e., an algebraic type) probability distributions. The goal of this work was to investigate the ability of using very short or incomplete data records for reliable statistical predictions of the extremes. In particular we discuss how to evaluate the uncertainty in the empirical or semi-analytical multifractal outcomes. We consider three main aspects of the evaluation, such as the scaling adequacy, the multifractal parameter estimation error and the quantile estimation error. We first use the multiplicative cascade model to generate long series of multifractal data. The simulated samples had to cover the range of the universal multifractal parameters widely available in the scientific literature for the rainfall and river discharges. Using these long multifractal series and their sub-samples, we defined a metric for parameter estimation error. Then using the sets of estimated parameters, we obtained the quantile values for a range of excedance probabilities from 5% to 0.01%. Plotting the error bars on a quantile plot enable an approximation of confidence intervals that would be particularly important for the predictions of multifractal extremes. We finally illustrate the efficiency of such concept on its application to a large database (more than 16000 selected stations over USA and

  14. Hydro-economic modelling in mining catchments

    Science.gov (United States)

    Ossa Moreno, J. S.; McIntyre, N.; Rivera, D.; Smart, J. C. R.

    2017-12-01

    Hydro-economic models are gaining momentum because of their capacity to model both the physical processes related to water supply, and socio-economic factors determining water demand. This is particularly valuable in the midst of the large uncertainty upon future climate conditions and social trends. Agriculture, urban uses and environmental flows have received a lot of attention from researchers, as these tend to be the main consumers of water in most catchments. Mine water demand, although very important in several small and medium-sized catchments worldwide, has received less attention and only few models have attempted to reproduce its dynamics with other users. This paper describes an on-going project that addresses this gap, by developing a hydro-economic model in the upper Aconcagua River in Chile. This is a mountain catchment with large scale mining and hydro-power users at high altitudes, and irrigation areas in a downstream valley. Relevant obstacles to the model included the lack of input climate data, which is a common feature in several mining areas, the complex hydrological processes in the area and the difficulty of quantifying the value of water used by mines. A semi-distributed model developed within the Water Evaluation and Planning System (WEAP), was calibrated to reproduce water supply, and this was complemented with an analysis of the value of water for mining based on two methods; water markets and an analysis of its production processes. Agriculture and other users were included through methods commonly used in similar models. The outputs help understanding the value of water in the catchment, and its sensitivity to changes in climate variables, market prices, environmental regulations and changes in the production of minerals, crops and energy. The results of the project highlight the importance of merging hydrology and socio-economic calculations in mining regions, in order to better understand trade-offs and cost of opportunity of using

  15. HydroHillChart – Francis module. Software used to Calculate the Hill Chart of the Francis Hydraulic Turbines

    Directory of Open Access Journals (Sweden)

    Dorian Nedelcu

    2015-07-01

    Full Text Available The paper presents the Hydro Hill Chart - Francis module application, used to calculate the hill chart of the Pelton, Francis and Kaplan hydraulic turbine models, by processing the data measured on the stand. After describing the interface and menu, the input data is graphically presented and the universal characteristic for measuring scenarios ao=const. and n11=const is calculated. Finally, the two calculated hill charts are compared through a graphical superimposition of the isolines.

  16. [Ontario Hydro]. Corporate performance report, 1994

    International Nuclear Information System (INIS)

    1995-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in 1993, beginning with overall results in such areas as customer service, environmental stewardship, human resources, and finance. This is followed by reports from the Generation Business Group, Customer Services Group, Corporate Business Group, General Counsel and Secretary, Ontario Hydro Audit, Strategic Planning, Environment and Communication Group, and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix includes summary financial statements

  17. Hydro in China: Sino-Canadian cooperation

    International Nuclear Information System (INIS)

    Wiebe, P.A.; Webb, N.K.

    1988-01-01

    Despite a population of over 1 billion, China's installed electric generating capacity is similar to Canada's. To help alleviate the energy shortfalls, the government's seventh 5 year plan (1985-1990) calls for annual installation of new capacity of ca 7,000 MW, the equivalent of a James Bay and Churchill Falls complex every two years. In the short term, 2/3 of new capacity will be filled by thermal stations, but in the longer term, China will turn to its huge undeveloped hydroelectric generating capacity. Information is presented on China's hydroelectric resources, and four hydro projects currently under development in conjunction with Canadian International Project Managers (CIPM), a company whose members are Acres International Inc. of Toronto, Lavalin International Inc. of Montreal and S.N.C. Inc. of Montreal. The Zhao Ping project is a conventional 200 MW project on the Gui River in Guangxi Province in south China, comprising a 73 m high concrete gravity dam and spillway. The Gehe Yan comprises a 151 m high concrete gravity arch dam and spillway and a 1,200 MW powerhouse. The Longtan project would be a 215 m high concrete rockfaced dam with ten 500 MW units and an inclined shiplift with a 500 tonne vessel capacity. The Three Gorges is a multi-purpose water control project that will provide flood control to the regions on the middle reaches of the Yangtze, generate over 8,300 MW of power, and improve navigation on the Yangtze River as far as Chongqing. Up to 750,000 people will have to be resettled to higher land within the river valley. 4 figs., 2 tabs

  18. Hydroelectric modelling of the Paraiba do Sul and Jequitinhonha rivers sub-basins by using the VALORAGUA computer program; Modelagem hidreletrica das sub bacias dos rios Paraiba do Sul e Jequitinhonha utilizando o programa VALORAGUA

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, Vinicius Verna Magalhaes; Aronne, Ivan Dionysio [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN), Belo Horizonte, MG (Brazil)]. E-mails: vvmf@urano.cdtn.br; aroneid@urano.cdtn.br; Martinez, Carlos Barreira; Versiani, Bruno Rabelo [Minas Gerais Univ., Belo Horizonte, MG (Brazil). Escola de Engenharia. Dept. de Engenharia Hidraulica e Recursos Hidricos]. E-mail: martinez@cce.ufmg.br; versiani@ehr.ufmg.br

    2002-07-01

    This work presents a modelling of 50 hydroelectric power plants in the East Atlantica hydro graphic basin, operating, under construction or as basic projects. The simulations are performed by using the VALORAGUA computer code, developed by the EDP - Eletricidade de Portugal. The studies concentrate mostly on the sub basins of the Jequitinhonha and Paraiba do Sul rivers. The study includes the thermal power plants existent on the same geographical region. Some obtained results such as capacity factors and energy generation values are analysed. Some considerations are made on questions referring to the Brazilian energetic problems.

  19. Computer graphics at VAX JINR

    International Nuclear Information System (INIS)

    Balashov, V.K.

    1991-01-01

    The structure of the software for computer graphics at VAX JINR is described. It consists of graphical packages GKS, WAND and a set graphicals packages for High Energy Physics application designed at CERN. 17 refs.; 1 tab

  20. Integrated operation of hydro thermal system

    International Nuclear Information System (INIS)

    Nanthakumar, J.

    1994-01-01

    Long-term power system expansion planning studies are carried out to meet the electricity requirement in the future. Prior to the expansion planning studies, it is essential to know the energy potential of the existing generating system, especially the hydro power plants. Detailed hydro thermal stimulation studies of the integrated system is therefore carried out to determine the best way to maximise the hydro energy of the existing and committed plants. The results of the integrated system simulated model are stored in numerous files and are available for retrieval. Most important output used for expansion analysis is the energy production of each hydro plant. The annual hydro energy potential of the total hydro system of Sri Lanka for the hydrological year from 1949 to 1988 is given. Hydro condition data with different probability levels are also indicated

  1. Graphical symbol recognition

    OpenAIRE

    K.C. , Santosh; Wendling , Laurent

    2015-01-01

    International audience; The chapter focuses on one of the key issues in document image processing i.e., graphical symbol recognition. Graphical symbol recognition is a sub-field of a larger research domain: pattern recognition. The chapter covers several approaches (i.e., statistical, structural and syntactic) and specially designed symbol recognition techniques inspired by real-world industrial problems. It, in general, contains research problems, state-of-the-art methods that convey basic s...

  2. Flowfield computer graphics

    Science.gov (United States)

    Desautel, Richard

    1993-01-01

    The objectives of this research include supporting the Aerothermodynamics Branch's research by developing graphical visualization tools for both the branch's adaptive grid code and flow field ray tracing code. The completed research for the reporting period includes development of a graphical user interface (GUI) and its implementation into the NAS Flowfield Analysis Software Tool kit (FAST), for both the adaptive grid code (SAGE) and the flow field ray tracing code (CISS).

  3. HydroHillChart – Pelton module. Software used to Calculate the Hill Chart of the Pelton Hydraulic Turbines

    OpenAIRE

    Dorian Nedelcu; Adelina Bostan; Florin Peris-Bendu

    2015-01-01

    The paper presents the HydroHillChart - Pelton module application, used to calculate the hill chart of the Pelton hydraulic turbine models, by processing the data measured on the stand. In addition, the tools offered by the application such as: interface, menu, input data, numerical and graphical results, etc. are described.

  4. HydroHillChart – Pelton module. Software used to Calculate the Hill Chart of the Pelton Hydraulic Turbines

    Directory of Open Access Journals (Sweden)

    Dorian Nedelcu

    2015-07-01

    Full Text Available The paper presents the HydroHillChart - Pelton module application, used to calculate the hill chart of the Pelton hydraulic turbine models, by processing the data measured on the stand. In addition, the tools offered by the application such as: interface, menu, input data, numerical and graphical results, etc. are described.

  5. The Nothuesli small hydro project

    International Nuclear Information System (INIS)

    Balachandran, S.; Jorde, K.

    2008-01-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  6. Architecture at Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  7. ?Strange Attractors (chaos) in the hydro-climatology of Colombia?

    International Nuclear Information System (INIS)

    Poveda Jaramillo, German

    1997-01-01

    Inter annual hydro-climatology of Colombia is strongly influenced by extreme phases of ENSO, a phenomenon exhibiting many features of chaotic non-linear system. The possible chaotic nature of Colombian hydrology is examined by using time series of monthly precipitation at Bogota (1866-1992) and Medellin (1908-1995), and average stream flows of the Magdalena River at Puerto Berrio. The power spectrum, the Haussdorf-Besikovich (fractal) dimension, the correlation dimension, and the largest Lyapunov exponent are estimated for the time series. Ideas of hydrologic forecasting and predictability are discussed in the context of nonlinear dynamical systems exhibit chaotic behavior

  8. Ontario Hydro Research Division, 1980

    International Nuclear Information System (INIS)

    The work of the Research Division of Ontario Hydro provides technical and scientific support for the engineering and operation of a power system that includes hydraulic, fossil-fired, and nuclear generation. It also relates to the transmission and distribution of electricity and to the need to help customers use electricity with safety and economy. Among the examples of projects given are qualification of CANDU heat transport system components, pressure tube replacement, steam generator integrity, testing for earthquake resistance, and radioactive waste disposal

  9. Toronto Hydro annual report, 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Toronto Hydro is the electric utility serving about 219,000 customers in Toronto, Ontario. In 1992, the utility purchased 9.6 billion kWh of electricity from Ontario Hydro, down 3.6% from 1990. Energy sales totalled 9.2 billion kWh, down 4.1% from 1990. Retail electricity rates increased an average of 6.7% in 1992, in spite of an increase in Ontario Hydro's wholesale rate by 8.2%, due to better than anticipated financial results and cost-control measures. The decline in electricity purchases and sales are attributed to economic factors, which also contributed to an increase in the utility's provision for bad debts. The third year of a 13.8-kV conversion project was completed in 1992; this project is converting the existing 4 kV distribution system to the higher voltage since maintenance and repair of the existing system is costly and the equipment is becoming less reliable. New construction, refurbishing, and modernization of equipment were performed at a number of substations. Other improvements in 1992 are reported in the areas of management and engineering systems, personnel policies, work safety, and energy management. Financial statements are included. 11 figs., 4 tabs

  10. Good prospects for Portuguese small hydro industry

    International Nuclear Information System (INIS)

    Betamio de Almeida, A.; Serranho, H.

    2000-01-01

    The article outlines the history of hydro in Portugal and discusses the current position of small-scale hydro with particular reference to the Portuguese Small Hydro Association (AMPH). Encouraged by legislation, and the Valoren community programme (which defined investment incentives), many new small hydro projects sprang up in Portugal in the 1990s. In some areas of Portugal the water levels were higher than the urban centres where the water is required: how the problems of integrating power and water were addressed is described. The integration of power and irrigation schemes is also mentioned. In the wake of great expansion in the Portuguese hydro industry, there was a sharp reduction (in 1995-6) and the reasons for that are listed. The 1999 tariff was such that it is likely that small hydro will provide 3.8% of the electric power consumed nationally by 2010

  11. Introduction to regression graphics

    CERN Document Server

    Cook, R Dennis

    2009-01-01

    Covers the use of dynamic and interactive computer graphics in linear regression analysis, focusing on analytical graphics. Features new techniques like plot rotation. The authors have composed their own regression code, using Xlisp-Stat language called R-code, which is a nearly complete system for linear regression analysis and can be utilized as the main computer program in a linear regression course. The accompanying disks, for both Macintosh and Windows computers, contain the R-code and Xlisp-Stat. An Instructor's Manual presenting detailed solutions to all the problems in the book is ava

  12. Mikado: A graphic program

    Science.gov (United States)

    Secretan, Y.

    A discussion of the modular program Mikado is presented. Mikado was developed with the goal of creating a flexible graphic tool to display and help analyze the results of finite element fluid flow computations. Mikado works on unstructured meshes, with elements of mixed geometric type, but also offers the possibility of using structured meshes. The program can be operated by both menu and mouse (interactive), or by command file (batch). Mikado is written in FORTRAN, except for a few system dependent subroutines which are in C. It runs presently on Silicon Graphics' workstations and could be easily ported to the IBM-RISC System/6000 family of workstations.

  13. Automation of hydro power on the upper Rhine and modernization of a power station at the confluence of the Rhine and Aare rivers; Automatisierung der Wasserwirtschaft am Hochrhein und Modernisierung eines Kraftwerkes am Zusammenfluss von Aare und Rhein

    Energy Technology Data Exchange (ETDEWEB)

    Beltzig, C.; Schlageter, G.

    1996-12-31

    For the first barrage weir after the confluence of the Rhine and Aare rivers, a maximum storage level is determined and set that constitutes an operating optimum and takes the different inflow and outfall volumes as well as existing retention capacities into account. Moreover, the process control system ensures automatic operation of the three engine units of the power station including process control of the barrage weir and the external systems belonging to the Albbruck-Doggern hydroelectric power station on the Rhine (RADAG). (orig./RHM)

  14. [Ontario Hydro International Inc.]. Annual report 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Ontario Hydro International Inc. is the international representative of Ontario Hydro. OHII operates as a global utility that markets Ontario Hydro's services and products. Its mission is to be the leader in energy efficiency and sustainable development in the international marketplace. This report describes the year's activities in the following areas: Energy management and environment, hydroelectric generation, nuclear products and services, fossil generation, grid (transmission) business, utility management, Asia Power Group Inc. The document also includes financial highlights and international and customer contracts

  15. BC hydro: Annual report, 1991-1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The third largest electric utility in Canada, B.C. Hydro services almost 1.3 million customers in an area containing over 92 per cent of British Columbia's population. B.C. Hydro's mission is to generate, transmit and distribute electricity. This annual report covers the business and financial performance of B.C. Hydro, and financial statistics.

  16. Mathematical structures for computer graphics

    CERN Document Server

    Janke, Steven J

    2014-01-01

    A comprehensive exploration of the mathematics behind the modeling and rendering of computer graphics scenes Mathematical Structures for Computer Graphics presents an accessible and intuitive approach to the mathematical ideas and techniques necessary for two- and three-dimensional computer graphics. Focusing on the significant mathematical results, the book establishes key algorithms used to build complex graphics scenes. Written for readers with various levels of mathematical background, the book develops a solid foundation for graphics techniques and fills in relevant grap

  17. [Ontario Hydro]. Corporate performance report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values established in the approved corporate financial plan and work program budget. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in mid-1993, beginning with overall results in such areas as customer satisfaction, electricity sales, human resources, and environmental protection. This is followed by reports from the Electricity Group (supply, generation, transmission), the Energy Services and Environment Group (load saved and shifted, non-utility generation, retail distribution), and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix contains summary financial statements

  18. 76 FR 67175 - Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp...

    Science.gov (United States)

    2011-10-31

    ...; 14149-000] Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp... Lock Hydro Friends Fund XXXVI (Lock Hydro) and on April 11, 2011, Arkansas Electric Cooperative Corp... & Dam No. 3, as directed by the Corps. Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090...

  19. Fault tree graphics

    International Nuclear Information System (INIS)

    Bass, L.; Wynholds, H.W.; Porterfield, W.R.

    1975-01-01

    Described is an operational system that enables the user, through an intelligent graphics terminal, to construct, modify, analyze, and store fault trees. With this system, complex engineering designs can be analyzed. This paper discusses the system and its capabilities. Included is a brief discussion of fault tree analysis, which represents an aspect of reliability and safety modeling

  20. Mathematical Graphic Organizers

    Science.gov (United States)

    Zollman, Alan

    2009-01-01

    As part of a math-science partnership, a university mathematics educator and ten elementary school teachers developed a novel approach to mathematical problem solving derived from research on reading and writing pedagogy. Specifically, research indicates that students who use graphic organizers to arrange their ideas improve their comprehension…

  1. Graphical Interfaces for Simulation.

    Science.gov (United States)

    Hollan, J. D.; And Others

    This document presents a discussion of the development of a set of software tools to assist in the construction of interfaces to simulations and real-time systems. Presuppositions to the approach to interface design that was used are surveyed, the tools are described, and the conclusions drawn from these experiences in graphical interface design…

  2. Printer Graphics Package

    Science.gov (United States)

    Blanchard, D. C.

    1986-01-01

    Printer Graphics Package (PGP) is tool for making two-dimensional symbolic plots on line printer. PGP created to support development of Heads-Up Display (HUD) simulation. Standard symbols defined with HUD in mind. Available symbols include circle, triangle, quadrangle, window, line, numbers, and text. Additional symbols easily added or built up from available symbols.

  3. Comics & Graphic Novels

    Science.gov (United States)

    Cleaver, Samantha

    2008-01-01

    Not so many years ago, comic books in school were considered the enemy. Students caught sneaking comics between the pages of bulky--and less engaging--textbooks were likely sent to the principal. Today, however, comics, including classics such as "Superman" but also their generally more complex, nuanced cousins, graphic novels, are not only…

  4. Nuclear power at Ontario Hydro

    International Nuclear Information System (INIS)

    Tapon, F.; Osborne, T.J.

    1980-01-01

    This case study shows that the diffusion of nuclear power in the electric public utility industry in Canada approximates the logistic growth curve, in agreement with previous results on technological innovation diffusion in the U.S. private sector. Many of the economic variables that affect this diffusion in the private sectors in the U.S. and Canada are also significant in the public sector in Canada. Too few utilities have adopted nuclear technology to permit using regression analysis to study the effect of environmental and regulatory factors on the growth of Ontario Hydro. Thus, cost-benefit analysis for each province might be more effective

  5. Electricity production by hydro power plants: possibilities of forecasting

    International Nuclear Information System (INIS)

    Barkans, J.; Zicmane, I.

    2004-01-01

    Hydro energy accounts for 17% of global electricity production and is the most important source of renewable energies actively used today, being at the same time the least influential ecologically. Its only disadvantages is that this kind of energy is difficult to forecast, which hinders not only the planning of tariffs, year budgets and investments, but also contractual negotiations in particular month. The paper shows that the forecasting of hydro energy production can be linked to certain natural processes, namely, to the cyclic behaviour observed for water flows of the world's rivers. The authors propose a method according to which the forecasting procedure is performed using the data of observations as signals applied to special digital filters transforming the water flow process into integral and differential forms, which after appropriate treatment are expected again in usual water flow units. For this purpose the water flow integral function is to be divided, by means of spectral analysis, into 'low-frequency' (with a semi-period of 44 years) and 'high-frequency' (4-6 year semi-periods) components, which are of different origin. Each of them should be forecasted separately, with the following summation of the results. In the research it is shown that the cyclic fluctuations of world rivers' water flows are directly associated with variations in the Solar activity. (authors)

  6. Small hydro in Ukraine: To invest or not to invest?

    Energy Technology Data Exchange (ETDEWEB)

    Loechen, Liv Arntzen

    2011-07-01

    The vast and unexploited renewable energy potential and the introduction of green tariffs in 2009 have made Ukraine an attractive location for investors within the renewable energy sector. The Green Tariff system offers developers and investors the highest feed-in tariffs in Eastern Europe, and thus far covers alternative energy production from biomass, biogas, wind power plants and hydropower plants. Ukraine has a history in both large- and small hydro production. Whereas the potential of the country's big rivers is now to a great extent exploited, this is not the case for the smaller watercourses. Ukraine is well endowed with small rivers, approximately 60,000 of which can be classified as 'very small'. Most of these are located in the western part of the country, near the Carpathian Mountains. However, despite the natural potential, foreign investors should be aware of the potential risks and hurdles. The country has a huge problem with corruption, and the process of obtaining licenses is not straight forward. On the whole, it can be worthwhile exploring the possibilities of small hydro production in Ukraine for those who can deal with a high level of risk and uncertainty. If not, one would be better advised to look for investment locations elsewhere.(auth)

  7. Graphics gems V (Macintosh version)

    CERN Document Server

    Paeth, Alan W

    1995-01-01

    Graphics Gems V is the newest volume in The Graphics Gems Series. It is intended to provide the graphics community with a set of practical tools for implementing new ideas and techniques, and to offer working solutions to real programming problems. These tools are written by a wide variety of graphics programmers from industry, academia, and research. The books in the series have become essential, time-saving tools for many programmers.Latest collection of graphics tips in The Graphics Gems Series written by the leading programmers in the field.Contains over 50 new gems displaying some of t

  8. Topographic Digital Raster Graphics - USGS DIGITAL RASTER GRAPHICS

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — USGS Topographic Digital Raster Graphics downloaded from LABINS (http://data.labins.org/2003/MappingData/drg/drg_stpl83.cfm). A digital raster graphic (DRG) is a...

  9. Romanian achievement in hydro-power plants

    International Nuclear Information System (INIS)

    Cardu, M.; Bara, T.

    1998-01-01

    This paper briefly deals with the achievements relating to Hydro-electric Power Plants within the process of development of the National Power System in Romania. Also presented is the Romanian industry contribution to hydro-electrical power plant equipment manufacturing. (author)

  10. Ontario Hydro Research Division annual report 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The Research Division of Ontario Hydro conducts research in the fields of chemistry, civil engineering, electrical engineering, mechanical engineering, metallurgy, and operations. Much of the research has a bearing on the safe, environmentally benign operation of Ontario Hydro's nuclear power plants. Particular emphasis has been placed on nuclear plant component aging and plant life assurance

  11. Development of Hydro-Mechanical Deep Drawing

    DEFF Research Database (Denmark)

    Zhang, Shi-Hong; Danckert, Joachim

    1998-01-01

    The hydro-mechanical deep-drawing process is reviewed in this article. The process principles and features are introduced and the developments of the hydro-mechanical deep-drawing process in process performances, in theory and in numerical simulation are described. The applications are summarized....... Some other related hydraulic forming processes are also dealt with as a comparison....

  12. Optimal control systems in hydro power plants

    International Nuclear Information System (INIS)

    Babunski, Darko L.

    2012-01-01

    The aim of the research done in this work is focused on obtaining the optimal models of hydro turbine including auxiliary equipment, analysis of governors for hydro power plants and analysis and design of optimal control laws that can be easily applicable in real hydro power plants. The methodology of the research and realization of the set goals consist of the following steps: scope of the models of hydro turbine, and their modification using experimental data; verification of analyzed models and comparison of advantages and disadvantages of analyzed models, with proposal of turbine model for design of control low; analysis of proportional-integral-derivative control with fixed parameters and gain scheduling and nonlinear control; analysis of dynamic characteristics of turbine model including control and comparison of parameters of simulated system with experimental data; design of optimal control of hydro power plant considering proposed cost function and verification of optimal control law with load rejection measured data. The hydro power plant models, including model of power grid are simulated in case of island ing and restoration after breakup and load rejection with consideration of real loading and unloading of hydro power plant. Finally, simulations provide optimal values of control parameters, stability boundaries and results easily applicable to real hydro power plants. (author)

  13. Interactive Graphic Journalism

    Directory of Open Access Journals (Sweden)

    Laura Schlichting

    2016-12-01

    Full Text Available This paper examines graphic journalism (GJ in a transmedial context, and argues that transmedial graphic journalism (TMGJ is an important and fruitful new form of visual storytelling, that will re-invigorate the field of journalism, as it steadily tests out and plays with new media, ultimately leading to new challenges in both the production and reception process. With TMGJ, linear narratives may be broken up and ethical issues concerning the emotional and entertainment value are raised when it comes to ‘playing the news’. The aesthetic characteristics of TMGJ will be described and interactivity’s influence on non-fiction storytelling will be explored in an analysis of The Nisoor Square Shooting (2011 and Ferguson Firsthand (2015.

  14. Advanced diagnostic graphics

    International Nuclear Information System (INIS)

    Bray, M.A.; Petersen, R.J.; Clark, M.T.; Gertman, D.I.

    1981-01-01

    This paper reports US NRC-sponsored research at the Idaho National Engineering Laboratory (INEL) involving evaluation of computer-based diagnostic graphics. The specific targets of current evaluations are multivariate data display formats which may be used in Safety Parameter Display Systems (SPDS) being developed for nuclear power plant control rooms. The purpose of the work is to provide a basis for NRC action in regulating licensee SPDSs or later computer/cathode ray tube (CRT) applications in nuclear control rooms

  15. Graphic Grown Up

    Science.gov (United States)

    Kim, Ann

    2009-01-01

    It's no secret that children and YAs are clued in to graphic novels (GNs) and that comics-loving adults are positively giddy that this format is getting the recognition it deserves. Still, there is a whole swath of library card-carrying grown-up readers out there with no idea where to start. Splashy movies such as "300" and "Spider-Man" and their…

  16. New markets for small-scale hydro

    International Nuclear Information System (INIS)

    Maurer, E.A.

    1997-01-01

    The market for small and medium sized hydro-electric power plant is more attractive than ever. The boom in Europe has increasingly spread to the emerging countries, and here too small hydro plays an important ecological role. In addition to new plant rehabilitation of 'historical' plant is now a major factor. The last few years have seen a market shift from single machine components to complete plant and systems, requiring a strategy re-think on the part of larger companies. Following the influx of private capital into the power industry, business conditions have also undergone a thorough transformation. In place of 'fast money', hydro power offers the prospect of earning longer-term, sustainable money'. The term small-scale hydro-electric power (or simply 'small hydro') is used slightly differently depending on the country and market. Here, it is used to denote plant with turbines up to 10 MW. (Author)

  17. Using project management techniques in hydro-relicensing

    International Nuclear Information System (INIS)

    Dominie, D.; Richard, J.

    1991-01-01

    This paper reports that to answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company has applied the principles of project management, including the use of computerized scheduling to its hydro relicensing efforts. This approach involves early inter-departmental cooperation in mapping out critical path scheduling by requiring the project team to: Outline the scope of the project in its entirety. Clarify and define components of the project. Quantify and categorize assumptions and dependencies. Identify constraints. The computer-generated schedule of this cooperative planning effort provides a graphic representation of the team's plan and become the focal point for refinements and adjustments necessary to complete an application on time. The use of project management techniques facilities team understanding of the realities and limitations in the relicensing process. These techniques encourage cooperative action, and use a solution-oriented process resulting in a product which can be a useful tool in communicating with resource agencies and regulators

  18. Career Opportunities in Computer Graphics.

    Science.gov (United States)

    Langer, Victor

    1983-01-01

    Reviews the impact of computer graphics on industrial productivity. Details the computer graphics technician curriculum at Milwaukee Area Technical College and the cooperative efforts of business and industry to fund and equip the program. (SK)

  19. Hydro-plankton characteristics and their relationship with sardine and anchovy distributions on the French shelf of the Bay of Biscay

    Directory of Open Access Journals (Sweden)

    Pierre Petitgas

    2006-06-01

    Full Text Available The spatial pattern in hydro-plankton and fish distributions and their relationship were analysed based on the spring 2000 fisheries acoustic survey. The importance of this survey was that it was a multi-disciplinary platform which collected an extensive set of parameters in the hydro-plankton leading to a potentially finer description of hydro-plankton conditions and fish habitats. More than 50 variables were measured on a grid of stations, in four compartments of the ecosystem: hydrology, nutrients, primary producers and meso-zooplankton. First, a joint analysis of all hydro-plankton compartments was performed using multiple factor analysis (MFA. The method was used to estimate a compromise factorial space common to all compartments in which the stations were grouped by hierarchical clustering. The groups were represented spatially and a strong spatial pattern was evidenced. The fish and their spawned eggs were sampled along transect lines using acoustics and CUFES (continuous underway fish egg samplers. The distribution of the fish and their eggs was analysed in relation to the hydro-plankton groups of stations and difference in fish density across hydro-plankton conditions was tested by a pair-wise multiple comparison procedure. Anchovy was associated with a lesser number of hydro-plankton conditions than sardine. Eggs of both species were also associated with a lesser number of conditions than the fish. Finally, the gain provided by using the extensive set of hydro-plankton parameters for mapping large-scale hydro-plankton conditions was analysed in comparison with the situation in which a small set of parameters was available. The extensive set of parameters allowed more hydro-plankton conditions to be identified but only in the coastal area and not on the shelf. Size fractionated chlorophyll was determinant for tracking river plume hydro-plankton condition. However, the fish did not respond to the variety of the coastal hydro

  20. Design of Graphic Aggregation Model for Evaluation of Energy Systems

    International Nuclear Information System (INIS)

    An, Sang Ha; Jeong, Yong Hoon; Chang, Won Joon; Chang, Soon Heung; Kim, Sung Ho; Kim, Tae Woon

    2006-01-01

    Korea is meeting the growing electric power needs by mix of nuclear, fossil, hydro energy and so on. But we can not depend on fossil energy forever, and the people's concern about environment has been changed. So it is time to plan future energy mix considering multiple parameters such as economics, environment, social, energy security, etc. A multiple aggregation model has been used for decision making process in which multiple variables should be considered like energy mix. In this context, we designed Graphic Aggregation Model for Evaluation of energy systems (GAME) for the dynamic analysis of decision on the energy systems. It can support Analytic Hierarchy Process (AHP) analysis based on Graphic User Interface

  1. Gross greenhouse gas fluxes from hydro-power reservoir compared to thermo-power plants

    International Nuclear Information System (INIS)

    Santos, Marco Aurelio dos; Pinguelli Rosa, Luiz; Sikar, Bohdan; Sikar, Elizabeth; Santos, Ednaldo Oliveira dos

    2006-01-01

    This paper presents the findings of gross carbon dioxide and methane emissions measurements in several Brazilian hydro-reservoirs, compared to thermo power generation. The term 'gross emissions' means gas flux measurements from the reservoir surface without natural pre-impoundment emissions by natural bodies such as the river channel, seasonal flooding and terrestrial ecosystems. The net emissions result from deducting pre-existing emissions by the reservoir. A power dam emits biogenic gases such as CO 2 and CH 4 . However, studies comparing gas emissions (gross emissions) from the reservoir surface with emissions by thermo-power generation technologies show that the hydro-based option presents better results in most cases analyzed. In this study, measurements were carried in the Miranda, Barra Bonita, Segredo, Tres Marias, Xingo, and Samuel and Tucurui reservoirs, located in two different climatological regimes. Additional data were used here from measurements taken at the Itaipu and Serra da Mesa reservoirs. Comparisons were also made between emissions from hydro-power plants and their thermo-based equivalents. Bearing in mind that the estimated values for hydro-power plants include emissions that are not totally anthropogenic, the hydro-power plants studied generally posted lower emissions than their equivalent thermo-based counterparts. Hydro-power complexes with greater power densities (capacity/area flooded-W/m 2 ), such as Itaipu, Xingo, Segredo and Miranda, have the best performance, well above thermo-power plants using state-of-the-art technology: combined cycle fueled by natural gas, with 50% efficiency. On the other hand, some hydro-power complexes with low-power density perform only slightly better or even worse than their thermo-power counterparts

  2. Critical frameworks for graphic design: graphic design and visual culture

    OpenAIRE

    Dauppe, Michele-Anne

    2011-01-01

    The paper considers an approach to the study of graphic design which addresses the expanding nature of graphic design in the 21st century and the purposeful application of theory to the subject of graphic design. In recent years graphic design has expanded its domain from the world of print culture (e.g. books, posters) into what is sometimes called screen culture. Everything from a mobile phone to a display in an airport lounge to the A.T.M. carries graphic design. It has become ever more ub...

  3. Hydro-Quebec looks to integrated development of Quebec and its regions

    International Nuclear Information System (INIS)

    Bissonnette, Lise

    1995-01-01

    Hydro-Quebec's telecommunication system, the largest private telecommunications network in Canada, was discussed. The network was set up to assure safety and efficiency of the power plants and energy transmission and distribution lines. By the year 2000 Hydro-Quebec will need electronic links with all its industrial, commercial and residential customers in order to guarantee competitive service and full customer satisfaction. Investments of about one half billion dollars have been earmarked to boost the capacity of their telecommunications grid and meet steadily growing needs. As a result of the very difficult negotiations to resolve the native land claims issue, Hydro-Quebec was forced to adapt a strict and far-reaching environmental policy, which is now beginning to pay off not only in environmental terms, but also in terms of goodwill among actual and prospective customers. As a result of these huge infrastructure projects Hydro Quebec will be in a position to guarantee people access to energy at a price that is among the lowest in the world. Although demand growth could slow, demand itself will not wane. As part of this overall strategy, Hydro-Quebec plans to defer large-scale projects, instead, for the foreseeable future it will concentrate on smaller power plants, some of which could be built on rivers that have already been tamed

  4. Small hydro: Policy and potential in Spain

    International Nuclear Information System (INIS)

    Gutierrez, C.

    2001-01-01

    In Spain, the benefits of small-scale (less than 10 MW) hydro are apparently rarely appreciated and there is little support from European institutions. The article suggests that small hydro technology can make a significant contribution to the country's energy requirements and create employment, provided certain obstacles can be removed. Data on the number of small hydros in Spain, and of recent installations are given; the share of hydro in Spain's total energy production is 2.5%. The low environmental impact of hydro is extolled, and the conclusions of a recent study of 'environmental impacts of the production of electricity' are listed. There are said to be unreasonable administrative obstacles; for example, it is more difficult to obtain permission to refurbish a 100 kW hydro plant in Castilla y Leon than it is to install a 30,000 kW gas plant. Some details relating to the affect of hydro on aquatic ecosystems, noise levels, and water quality, are given

  5. The Case for Graphic Novels

    Directory of Open Access Journals (Sweden)

    Steven Hoover

    2012-04-01

    Full Text Available Many libraries and librarians have embraced graphic novels. A number of books, articles, and presentations have focused on the history of the medium and offered advice on building and maintaining collections, but very little attention has been given the question of how integrate graphic novels into a library’s instructional efforts. This paper will explore the characteristics of graphic novels that make them a valuable resource for librarians who focus on research and information literacy instruction, identify skills and competencies that can be taught by the study of graphic novels, and will provide specific examples of how to incorporate graphic novels into instruction.

  6. Graphics Gems III IBM version

    CERN Document Server

    Kirk, David

    1994-01-01

    This sequel to Graphics Gems (Academic Press, 1990), and Graphics Gems II (Academic Press, 1991) is a practical collection of computer graphics programming tools and techniques. Graphics Gems III contains a larger percentage of gems related to modeling and rendering, particularly lighting and shading. This new edition also covers image processing, numerical and programming techniques, modeling and transformations, 2D and 3D geometry and algorithms,ray tracing and radiosity, rendering, and more clever new tools and tricks for graphics programming. Volume III also includes a

  7. Deterministic Graphical Games Revisited

    DEFF Research Database (Denmark)

    Andersson, Klas Olof Daniel; Hansen, Kristoffer Arnsfelt; Miltersen, Peter Bro

    2012-01-01

    Starting from Zermelo’s classical formal treatment of chess, we trace through history the analysis of two-player win/lose/draw games with perfect information and potentially infinite play. Such chess-like games have appeared in many different research communities, and methods for solving them......, such as retrograde analysis, have been rediscovered independently. We then revisit Washburn’s deterministic graphical games (DGGs), a natural generalization of chess-like games to arbitrary zero-sum payoffs. We study the complexity of solving DGGs and obtain an almost-linear time comparison-based algorithm...

  8. Hydro or the waltz of managers

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    A critique of current management and personnel problems at Hydro-Quebec was presented. With 20,000 employees and some of the world's greatest hydroelectric projects to its credit, Hydro-Quebec has historically been a source of great pride for its employees and Quebec's society. However, recent problems related to management, bureaucratization and communications within the corporation have led to important moral problems within the workforce. Management of the corporation under the newly appointed president, Andre Caille, the issue of profitability and competitiveness, the worsening morale among employees and the relationship between Hydro-Quebec and the provincial government were the principal topics discussed

  9. 77 FR 77070 - Black Bear Hydro Partners, LLC;

    Science.gov (United States)

    2012-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2727-086] Black Bear Hydro...: October 24, 2012. d. Submitted By: Black Bear Hydro Partners, LLC (Black Bear Hydro). e. Name of Project... designating Black Bear Hydro as the Commission's non-federal representative for carrying out informal...

  10. Short-term regulation of hydro powerplants. Studies on the environmental effects

    International Nuclear Information System (INIS)

    Sinisalmi, T.; Riihimaeki, J.; Vehanen, T.; Yrjaenae, T.

    1997-01-01

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs

  11. Short-term regulation of hydro powerplants. Studies on the environmental effects

    Energy Technology Data Exchange (ETDEWEB)

    Sinisalmi, T. [ed.; Forsius, J.; Muotka, J.; Soimakallio, H. [Imatran Voima Oy, Vantaa (Finland); Riihimaeki, J. [VTT, Espoo (Finland); Vehanen, T. [Finnish Game and Fisheries Research Inst. (Finland); Yrjaenae, T. [North Ostrobothnia Regional Environmental Centre, Oulu (Finland)

    1997-12-31

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs.

  12. 77 FR 73654 - Eau Galle Renewable Energy Company, Eau Galle Hydro, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2012-12-11

    ... Renewable Energy Company, Eau Galle Hydro, LLC; Notice of Transfer of Exemption 1. By letter filed October 12, 2012, Eau Galle Renewable Energy Company informed the Commission that its exemption from... transferred to Eau Galle Renewable Energy Company by letter.\\2\\ The project is located on the Eau Galle River...

  13. The use of hydro-dynamic models in the practice-oriented education of engineering students

    Science.gov (United States)

    Sziebert, J.; Zellei, L.; Tamás, E. A.

    2009-04-01

    Management tasks related to open channel flows became rather comprehensive and multi-disciplinary, particularly with the predominancy of nature management aspects. The water regime of our rivers has proven to reach extremities more and more frequently in the past decades. In order to develop and analyse alternative solutions and to handle and resolve conflicts of interests, we apply 1D hydro-dynamic models in education for the explanation of processes and to improve practical skills of our students.

  14. Hydro-power: a long history, a bright future

    Energy Technology Data Exchange (ETDEWEB)

    Deudney, D

    1981-07-01

    A brief history of the spread of hydro-power in the world was given. Tables showing hydro-power potential and use, and the % electricity from hydro-power for 13 countries were included along with a graph showing % hydro-power operating, planned and under construction by region. The need for committed and farsighted political leadership for future development and the possibility of hydro production reaching 4 to 6 times its present level were discussed.

  15. Micro Hydro-Electric Energy Generation- An Overview

    OpenAIRE

    S. O. Anaza; M. S. Abdulazeez; Y. A. Yisah; Y. O. Yusuf; B. U. Salawu; S. U. Momoh

    2017-01-01

    Energy is required now more than ever due to population growth, industrialization and modernization. Challenges such as carbon dioxide (CO2) emissions and depletion of conventional source of energy necessitate for renewable sources, of which hydro energy seems to be the most predictable. Micro-hydro which is hydro energy in a “small” scale provides electricity to small communities by converting hydro energy into electrical energy. This paper is an overview of micro-hydro system by reviewing s...

  16. Emerging Market Attractiveness Index for hydro IPPs

    OpenAIRE

    Weaver, Tyson John

    2013-01-01

    This article addresses two primary commercial themes that affect the future development of the industry. 1. What are the most attractive future emerging markets for hydropower? 2. What parameters are utilized by international hydro IPPs to determine market attractiveness?

  17. Mobile units to hydro geochemistry characterization

    International Nuclear Information System (INIS)

    Gomez, P.; Martinez, B.; Turrero, M.J.

    1994-01-01

    This report shows the mobile units for hydro geochemical studies. The authors analyze the work of mobile unit and the cars that conform the unit: Sampling car and analysis car: The sampling and equipment are took into account as well

  18. Thai-Myanmar joint hydro schemes

    Energy Technology Data Exchange (ETDEWEB)

    Boonpiraks, S [Electricity Generating Authority of Thailand, Nonthaburi (Thailand)

    1992-10-01

    A brief overview is presented here of planned cooperation between Thailand and Myanmar to harness the hydro resources available along the border of the two countries. This would reduce their dependence on thermal generation. (author).

  19. Home and away with Norwegian hydro

    International Nuclear Information System (INIS)

    Jones, Simon

    2000-01-01

    Evidence of Norway's position as a world leader in terms of design and construction of hydroelectric power plant, and its position as the biggest producer of hydro in Europe, is presented. There is still some 30 TWh of hydro available for development in Norway. Statkraft is the country's biggest hydro generator: it owns and operates 54 hydro plants and has shares in a further 30. Statkraft's research has shown that there is still a large market for renewables in Europe and believes that householders are prepared to pay a premium for green energy. Statkraft trades energy with Denmark and Sweden and is believed to be planning further growth overseas. The new millennium is set to bring major changes in Norway's power industry: Hafslund and Elkem have already agreed to merge to create the country's biggest privately-owned power group

  20. Ontario hydro radioactive material transportation field guide

    International Nuclear Information System (INIS)

    Howe, W.

    1987-01-01

    The recent introduction of both the AECB Transport Packaging of Radioactive Material Regulations and Transport Canada's Transportation of Dangerous Goods Regulations have significantly altered the requirements for transporting radioactive material in Canada. Extensive additional training as well as certification of several hundred Ontario Hydro employees has been necessary to ensure compliance with the additional and revised regulatory requirements. To assist in the training of personnel, an 'active' corporate Ontario Hydro Field Guide for Radioactive Material Transport document has been developed and published. The contents of this Field Guide identify current Ontario Hydro equipment and procedures as well as the updated relevant regulatory requirements within Canada. In addition, to satisfying Ontario Hydro requirements for this type of information over two thousand of these Field Guides have been provided to key emergency response personnel throughout the province of Ontario to assist in their transportation accident response training

  1. Coanda hydro intake screen testing and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Howarth, J.

    2001-07-01

    The objective of this project has been to evaluate the effectiveness, suitability and cost benefit of the Aquashear Coanda effect, maintenance free intake screen for use in small hydro system intakes. (author)

  2. Can we be more Graphic about Graphic Design?

    OpenAIRE

    Vienne, Véronique

    2012-01-01

    Can you objectify a subjective notion? This is the question graphic designers must face when they talk about their work. Even though graphic design artifacts are omnipresent in our culture, graphic design is still an exceptionally ill-defined profession. This is one of the reasons design criticism is still a rudimentary discipline. No one knows for sure what is this thing we sometimes call “graphic communication” for lack of a better word–a technique my Webster’s dictionary describes as “the ...

  3. Annual report 1993 (Ontario Hydro, Toronto)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Ontario Hydro`s prime objective is to supply the people of Ontario with electricity at cost while maintaining high standards of safety and service. The annual report presents energy efficiency and competitiveness, operations in review, the environmental performance of the Corporation, the future, and choices for a sustainable future. A financial review and analysis is also provided, along with an auditor`s report and financial statements.

  4. Human factors engineering in the design of colour-graphic displays

    International Nuclear Information System (INIS)

    Fenton, E.F.

    1985-01-01

    The operator interface for Ontario Hydro's Darlington Nuclear Generating Station will rely extensively on the use of coloured graphic display formats. These are used for the presentation of both control and monitoring information. The displays are organized in a hierarchical relationship and a simple interactive selection method using light pens has been implemented. The application of human factors engineering principles has been a major factor in all aspects of the design. This paper describes the system and the human factors engineering function

  5. Identifying and Evaluating Chaotic Behavior in Hydro-Meteorological Processes

    Directory of Open Access Journals (Sweden)

    Soojun Kim

    2015-01-01

    Full Text Available The aim of this study is to identify and evaluate chaotic behavior in hydro-meteorological processes. This study poses the two hypotheses to identify chaotic behavior of the processes. First, assume that the input data is the significant factor to provide chaotic characteristics to output data. Second, assume that the system itself is the significant factor to provide chaotic characteristics to output data. For solving this issue, hydro-meteorological time series such as precipitation, air temperature, discharge, and storage volume were collected in the Great Salt Lake and Bear River Basin, USA. The time series in the period of approximately one year were extracted from the original series using the wavelet transform. The generated time series from summation of sine functions were fitted to each series and used for investigating the hypotheses. Then artificial neural networks had been built for modeling the reservoir system and the correlation dimension was analyzed for the evaluation of chaotic behavior between inputs and outputs. From the results, we found that the chaotic characteristic of the storage volume which is output is likely a byproduct of the chaotic behavior of the reservoir system itself rather than that of the input data.

  6. Hydro in the Kyoto era

    International Nuclear Information System (INIS)

    Bourdon, M.-C.

    2003-01-01

    Quebec has the best performance in North America in terms of greenhouse gas (GHG) emissions. Unlike neighbouring provinces and states which rely heavily on coal for power generation, Quebec generates 96 per cent of its electricity from hydroelectric power. However, no new dams have been built in the past decade in Quebec due to land disputes with Aboriginal communities and general distrust among many ecologists. It takes about 12 years for a hydroelectric project to come to fruition. For that reason, and in order to capitalize on energy market opportunities, Hydro-Quebec is seriously considering expanding its generating capability beyond the needs of Quebec consumers, with gas-fired thermal generating stations. Environmental groups claim that the proposal to build the Suroit combined-cycle facility near the United States border destroys Quebec's efforts to honour the Kyoto Protocol. Economists argue that it is entirely in the spirit of Kyoto if exports of hydroelectricity or natural gas from Canada to the United States leads to less use of oil or coal. But one energy modeling expert at INRS-Energie et Materiaux claims that Quebec has a moral obligation to develop hydroelectricity for its own use as well as for export purposes, noting that any country with the good fortune to have renewable forms of energy, such as wind and hydro, should develop them to lower world GHG emissions. Quebec has many opportunities to sell hydroelectricity even while domestic demand grows. Hydroelectricity from Quebec should interest some states that have adopted their own GHG reduction standards, despite the U.S. government's refusal to ratify Kyoto. It should also interest Ontario and the Maritimes because they will be trying to reduce emissions from their thermal plants. The current situation does not favour the Kyoto Protocol. Exports of electricity from Quebec have dropped because no new dams have been built in recent years and gas-fired plants are looking more attractive to power

  7. [Hardware for graphics systems].

    Science.gov (United States)

    Goetz, C

    1991-02-01

    In all personal computer applications, be it for private or professional use, the decision of which "brand" of computer to buy is of central importance. In the USA Apple computers are mainly used in universities, while in Europe computers of the so-called "industry standard" by IBM (or clones thereof) have been increasingly used for many years. Independently of any brand name considerations, the computer components purchased must meet the current (and projected) needs of the user. Graphic capabilities and standards, processor speed, the use of co-processors, as well as input and output devices such as "mouse", printers and scanners are discussed. This overview is meant to serve as a decision aid. Potential users are given a short but detailed summary of current technical features.

  8. Safety Parameters Graphical Interface

    International Nuclear Information System (INIS)

    Canamero, B.

    1998-01-01

    Nuclear power plant data are received at the Operations Center of the Consejo de Seguridad Nuclear in emergency situations. In order to achieve the required interface and to prepare those data to perform simulation and forecasting with already existing computer codes a Safety Parameters Graphical Interface (IGPS) has been developed. The system runs in a UNIX environment and use the Xwindows capabilities. The received data are stored in such a way that it can be easily used for further analysis and training activities. The system consists of task-oriented modules (processes) which communicate each other using well known UNIX mechanisms (signals, sockets and shared memory segments). IGPS conceptually have two different parts: Data collection and preparation, and Data monitorization. (Author)

  9. Graphics and visualization principles & algorithms

    CERN Document Server

    Theoharis, T; Platis, Nikolaos; Patrikalakis, Nicholas M

    2008-01-01

    Computer and engineering collections strong in applied graphics and analysis of visual data via computer will find Graphics & Visualization: Principles and Algorithms makes an excellent classroom text as well as supplemental reading. It integrates coverage of computer graphics and other visualization topics, from shadow geneeration and particle tracing to spatial subdivision and vector data visualization, and it provides a thorough review of literature from multiple experts, making for a comprehensive review essential to any advanced computer study.-California Bookw

  10. The Case for Graphic Novels

    OpenAIRE

    Steven Hoover

    2012-01-01

    Many libraries and librarians have embraced graphic novels. A number of books, articles, and presentations have focused on the history of the medium and offered advice on building and maintaining collections, but very little attention has been given the question of how integrate graphic novels into a library’s instructional efforts. This paper will explore the characteristics of graphic novels that make them a valuable resource for librarians who focus on research and information literacy i...

  11. Graphical models for genetic analyses

    DEFF Research Database (Denmark)

    Lauritzen, Steffen Lilholt; Sheehan, Nuala A.

    2003-01-01

    This paper introduces graphical models as a natural environment in which to formulate and solve problems in genetics and related areas. Particular emphasis is given to the relationships among various local computation algorithms which have been developed within the hitherto mostly separate areas...... of graphical models and genetics. The potential of graphical models is explored and illustrated through a number of example applications where the genetic element is substantial or dominating....

  12. Manitoba Hydro 1998 progress report

    International Nuclear Information System (INIS)

    1998-11-01

    Manitoba Hydro has four commitments: 1) they will integrate climate change management into their plans and operations, 2) between 1991 and 2012 they will reduce their greenhouse gas emissions in excess of 6% below 1990 levels, 3) they anticipate that their greenhouse gas production will be in excess of 40% below their 1990 levels by 2010-11, and 4) they have the potential to make a greater contribution to national and international environmental and economic efforts by developing additional hydroelectric energy. The performance to date in implementing their strategy since 1990 includes: the 1330 megawatt Limestone Generating Station came into full production in 1992, which has increased electricity output without additional greenhouse gas emissions; four coal fueled generating units were removed from service at Brandon Generating Station in 1996, reducing coal generating capacity; seven communities previously served have been connected to the province's provincial grid, reducing the emissions from diesel generators; demand-side energy initiatives resulted in a saving of 45 megawatts since 1990, and supply-side initiatives, 152 megawatts; and net exports have increased significantly, from 2,296 megawatt hours in 1990 to 13,888 megawatt hours in 1997-98, which displaces energy that would otherwise have been produced at fossil-fueled generating stations. tabs

  13. 3D for Graphic Designers

    CERN Document Server

    Connell, Ellery

    2011-01-01

    Helping graphic designers expand their 2D skills into the 3D space The trend in graphic design is towards 3D, with the demand for motion graphics, animation, photorealism, and interactivity rapidly increasing. And with the meteoric rise of iPads, smartphones, and other interactive devices, the design landscape is changing faster than ever.2D digital artists who need a quick and efficient way to join this brave new world will want 3D for Graphic Designers. Readers get hands-on basic training in working in the 3D space, including product design, industrial design and visualization, modeling, ani

  14. Computer graphics and research projects

    International Nuclear Information System (INIS)

    Ingtrakul, P.

    1994-01-01

    This report was prepared as an account of scientific visualization tools and application tools for scientists and engineers. It is provided a set of tools to create pictures and to interact with them in natural ways. It applied many techniques of computer graphics and computer animation through a number of full-color presentations as computer animated commercials, 3D computer graphics, dynamic and environmental simulations, scientific modeling and visualization, physically based modelling, and beavioral, skelatal, dynamics, and particle animation. It took in depth at original hardware and limitations of existing PC graphics adapters contain syste m performance, especially with graphics intensive application programs and user interfaces

  15. Computer graphics in engineering education

    CERN Document Server

    Rogers, David F

    2013-01-01

    Computer Graphics in Engineering Education discusses the use of Computer Aided Design (CAD) and Computer Aided Manufacturing (CAM) as an instructional material in engineering education. Each of the nine chapters of this book covers topics and cites examples that are relevant to the relationship of CAD-CAM with engineering education. The first chapter discusses the use of computer graphics in the U.S. Naval Academy, while Chapter 2 covers key issues in instructional computer graphics. This book then discusses low-cost computer graphics in engineering education. Chapter 4 discusses the uniform b

  16. Energy generated for you : Newfoundland and Labrador Hydro 2003 annual report

    International Nuclear Information System (INIS)

    2004-01-01

    This report provides a consolidated review of the operations of Newfoundland and Labrador Hydro (Hydro) with focus on energy production, energy sales, and environmental commitment. The utility, a Crown Corporation owned by the Province of Newfoundland and Labrador, generates, transmits and distributes electricity to utility, industrial and residential customers. It is the parent company of the Hydro Group of Companies which includes Newfoundland and Labrador Hydro, Churchill Falls Corp. Ltd., Lower Churchill Development Corp. Ltd., Gull Island Power Co. Ltd., and Twin Falls Power Co. Ltd.. The installed generating capacity of the Hydro Group of Companies is the fourth largest in Canada. The generating assets include 10 operating hydroelectric plants, 1 oil-fired plant, 4 gas turbines, 28 diesel plants, and the Churchill Falls Hydroelectric generating station. The utility also maintains 4,800 km of transmission lines and more than 3,600 km of lower voltage distribution lines. The utility is isolated from the North American grid. Energy sales in 2003 were one per cent above 2002. The Holyrood thermal generating station had a gross production of 2061 GWh in 2003, an 18 per cent reduction from 2002. The 40 MW Granite Canal Hydroelectric generating station was completed in 2003. The utility also purchased electricity from Corner Brook Pulp and Paper and the Exploits River Partnership in order to meet the demand for capacity and energy on the island. The Hydro Group's net income decreased by 24 per cent in 2003, while there was a 3 per cent increase in revenue. Earnings are expected to be higher in 2004 due to a projected increase in rates. This annual report presented the company's financial performance, executive changes, rural rate inquiry, and reorganization. Financial statements included a thorough review and analysis of financial transactions, the auditor's report, and the customary notes to the consolidated financial statement including balance sheets, assets

  17. Evaluating Texts for Graphical Literacy Instruction: The Graphic Rating Tool

    Science.gov (United States)

    Roberts, Kathryn L.; Brugar, Kristy A.; Norman, Rebecca R.

    2015-01-01

    In this article, we present the Graphical Rating Tool (GRT), which is designed to evaluate the graphical devices that are commonly found in content-area, non-fiction texts, in order to identify books that are well suited for teaching about those devices. We also present a "best of" list of science and social studies books, which includes…

  18. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    International Nuclear Information System (INIS)

    Wiebe, P.A.

    1994-01-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs

  19. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    Energy Technology Data Exchange (ETDEWEB)

    Wiebe, P.A

    1994-06-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs.

  20. Hydro-thermal power flow scheduling accounting for head variations

    International Nuclear Information System (INIS)

    El-Hawary, M.E.; Ravindranath, K.M.

    1992-01-01

    In this paper the authors treat the problem of optimal economic operation of hydrothermal electric power systems with variable head hydro plants employing the power flow equations to represent the network. Newton's method is used to solve the problem for a number of test systems. A comparison with solutions with fixed head is presented. In general the optimal schedule requires higher slack bus and thermal power generation and cost in the case of variable head hydro plant than that required by the fixed head hydro plant in all demand periods. Correspondingly, the hydro generation is less in the case of variable head hydro plant compared to fixed head hydro plant. A negligible difference in voltage magnitudes in all the time intervals, but it is observed that slightly higher voltages occur in the case of the fixed head hydro plant. Higher power and energy losses occur in the case of variable head hydro plants compared to the fixed head hydro plants

  1. A comparison of the aquatic impacts of large hydro and small hydro projects

    Science.gov (United States)

    Taylor, Lara A.

    The expansion of small hydro development in British Columbia has raised concerns surrounding the effects of these projects, and the provincial government's decision to proceed with Site C has brought attention to the impacts of large hydro. Together, these decisions highlight that there are impacts associated with all energy development. My study examines the aquatic effects of large and small hydro projects using two case study sites: Site C and the Upper Harrison Water Power Project. I first determine the aquatic effects of each of the case study sites. Next, I use existing literature and benefits transfer to determine the monetary value of these effects. My results suggest that, with mitigation, small hydro projects have less of an effect on the environment than a large hydro project per unit of electricity. I also describe the implications of my study in the context of current British Columbia energy policy. Keywords: hydropower; aquatic effects. Subject Terms: environmental impact assessment; benefits transfer.

  2. Replacement of the Farbtobel hydro power installation in Peist, Switzerland; Gemeinde Peist (GR). Neubau Wasserkraftwerk Farbtobel - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Scherrer, I.; Gadient, N.

    2009-12-15

    This illustrated report for the Swiss Federal Office of Energy (SFOE) deals with various aspects of a small hydro project in Peist, Switzerland. The report presents a project concerning the replacement of the existing Farbtobel small hydro installation. The catchment area involved, its hydrology, high-water considerations and river ecology are examined. The power station concept, installed power and annual production figures are discussed. Investments, operating costs and financial viability are also looked at. Remuneration for the power produced through the Swiss cost-covering remuneration scheme is discussed.

  3. Mid and long-term optimize scheduling of cascade hydro-power stations based on modified GA-POA method

    Directory of Open Access Journals (Sweden)

    J. Li

    2018-06-01

    Full Text Available In this paper, to explore the efficiency and rationality of the cascade combined generation, a cascade combined optimal model with the maximum generating capacity is established, and solving the model by the modified GA-POA method. It provides a useful reference for the joint development of cascade hydro-power stations in large river basins. The typical annual runoff data are selected to calculate the difference between the calculated results under different representative years. The results show that the cascade operation of cascaded hydro-power stations can significantly increase the overall power generation of cascade and ease the flood risk caused by concentration of flood season.

  4. Oklahoma's Mobile Computer Graphics Laboratory.

    Science.gov (United States)

    McClain, Gerald R.

    This Computer Graphics Laboratory houses an IBM 1130 computer, U.C.C. plotter, printer, card reader, two key punch machines, and seminar-type classroom furniture. A "General Drafting Graphics System" (GDGS) is used, based on repetitive use of basic coordinate and plot generating commands. The system is used by 12 institutions of higher education…

  5. Software for graphic display systems

    International Nuclear Information System (INIS)

    Karlov, A.A.

    1978-01-01

    In this paper some aspects of graphic display systems are discussed. The design of a display subroutine library is described, with an example, and graphic dialogue software is considered primarily from the point of view of the programmer who uses a high-level language. (Auth.)

  6. Graphics Education Survey. Part II.

    Science.gov (United States)

    Ernst, Sandra B.

    After a 1977 survey reflected the importance of graphics education for news students, a study was developed to investigate the state of graphics education in the whole field of journalism. A questionnaire was sent to professors and administrators in four print-oriented professional fields of education: magazine, advertising, public relations, and…

  7. comparative measurement o river for small hydro tive measurement

    African Journals Online (AJOL)

    eobe

    Keywords: Keywords: small hydropower, electric power, volum ... gathering systems. .... or revolving cups connected to the end. ..... Also, the float velocity may have been affected by wind ... completely dedicated as off-grid supply can meet the.

  8. Columbia River ESI: HYDRO (Hydrography Lines and Polygons)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains vector lines and polygons representing coastal hydrography used in the creation of the Environmental Sensitivity Index (ESI) for Columbia...

  9. Climate impact on BC Hydro's water resources

    International Nuclear Information System (INIS)

    Smith, D.; Rodenhuis, D.

    2008-01-01

    BC Hydro like many other hydro utilities has used the historical record of weather and runoff as the standard description the variability and uncertainty of the key weather drivers for its operation and planning studies. It has been conveniently assumed that this historical record is or has been statistically stationary and therefore is assumed to represent the future characteristics of climatic drivers on our system. This assumption is obviously no longer justifiable. To address the characterisation of future weather, BC Hydro has a multi-year a directed research program with the Pacific Climate Impacts Consortium to evaluate the impacts of climate change on the water resources that BC Hydro manages for hydropower generation and other uses. The objective of this program is to derive climate change adjusted meteorologic and hydrologic sequences suitable for use in system operations and planning studies. These climate-adjusted sequences then can be used to test system sensitivity to climate change scenarios relative to the baseline of the historical record. This paper describes BC Hydro's research program and the results achieved so far. (author)

  10. BC Hydro shops for GHG offsets

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    BC Hydro is reported to have offered to purchase one million tonnes of carbon dioxide reductions in Canada's Greenhouse Gas Emissions Reduction Trading program (GERT). The program uses a baseline and credit system, where emitters purchase measurable quantities of site-specific GHG reductions. Since mid-1998, the program registered five bilateral trades and seven offers to sell. BC Hydro's recent offer is the first offer to buy. BC Hydro has made the offer to buy in expectation of the introduction of the start of the Kyoto Protocol reductions, and expects to be in the game for some time to come if it is to meet its obligations under the Kyoto Protocol. Preference will be given to projects located in Canada, but BC Hydro will consider reductions created anywhere in the world. The financial range of a single trade is between $50,000 and $1 million. (GHG offsets are currently trading in North America for between $.50 and $3.00 Cdn per metric tonne of carbon dioxide equivalent.) At present, offsets are selling at a heavily discounted price because of the uncertainty that investments made now will be credited against future regulations curbing emitters. Consequently, buying now while prices are low, may lead to sizable benefits later, depending on the actual regulations when they are promulgated. Trading now will also give BC Hydro greater credibility and assurance to have its voice heard when discussions about emissions trading and the implementation of emission trading rules reaches the serious stage

  11. Mini hydro power in Peninsular Malaysia - the past, present and future

    International Nuclear Information System (INIS)

    Bhaskar Kannan

    2006-01-01

    The early development of mini hydro development in Peninsular Malaysia was carried out by the National Electricity Board (NEB) and the projects developed in the 50s and 60s were Ulu Langat (Selangor), Sempam, Kg. Raja , Kuala Terla, and Robinson Falls (all in Pahang). In the 70s the main effort of hydropower development was concentrated on developing major hydropower projects not only to cater to the country increasing demand for electricity but also to the country needs for flood control. This development was feverishly carried out on the Perak River and the prohects built were Temenggor (384 MW), Bersia (72 MW), Kenering (20 MW), Sg Piah (70 MW) and the Kenyir (400 MW) project in Sungai Terengganu. In late 1970s, the government was keen to electrify the rural areas of Peninsular Malaysia and mini hydro power development was thought of as an option to provide electricity to these areas. The Mini Hydro Department of National Electricity Board (MHD) was then formed to undertake the task of planning, developing and implementing mini hydro projects to meet this government aspiration. Table 1 shows the list of projects identified and implemented and its status

  12. ElectroEncephaloGraphics: Making waves in computer graphics research.

    Science.gov (United States)

    Mustafa, Maryam; Magnor, Marcus

    2014-01-01

    Electroencephalography (EEG) is a novel modality for investigating perceptual graphics problems. Until recently, EEG has predominantly been used for clinical diagnosis, in psychology, and by the brain-computer-interface community. Researchers are extending it to help understand the perception of visual output from graphics applications and to create approaches based on direct neural feedback. Researchers have applied EEG to graphics to determine perceived image and video quality by detecting typical rendering artifacts, to evaluate visualization effectiveness by calculating the cognitive load, and to automatically optimize rendering parameters for images and videos on the basis of implicit neural feedback.

  13. Relations between the oxygen-18 values in natural water from hydro graphic basins

    International Nuclear Information System (INIS)

    Martinez, J.C.

    1990-02-01

    After the observation of certain basic condition necessary to the application of research, the experiment was accomplished in two small watersheds, under agricultural utilization, with surfaces of 1,581 km 2 and 3,268 Km 2 , drained by the Bufalos and Paraiso streams respectively. For four years (from February 1, 1984 to December 31, 1987) the values of the oxygen -18 content of the precipitation waters and those of the streams were analysed. The waters of the observation well, and those of the soil in their most varied depths, were analysed from december 4, 1986 to september 1, 1987. The oxygen - 18 obtained values were applied in there different models which estimate the water residence time in a watershed, and consequently other hydrology characteristics. (author)

  14. Revitalizing the nuclear business at Ontario Hydro

    International Nuclear Information System (INIS)

    Talbot, K.

    1994-01-01

    Ontario Hydro, North America's largest electric power utility, with an installed capacity of 34,000 MW, has under gone a major restructuring over the past year to better align itself with a changing electricity market and evolving customer needs. The single largest new business unit within the new Ontario Hydro is Ontario Hydro Nuclear (OHN), responsible for engineering, operation and maintenance of the Corporation's 20 large nuclear units at three generating sites, OHN faces a significant challenge in returning Ontario's nuclear units to the world-leading performance levels they enjoyed in the past, particularly the older Pickering A and Bruce A plants. However, steady progress is being made as evidenced by improving peer reviews and overall capacity and financial performance

  15. Collision data involving hydro-carbon molecules

    International Nuclear Information System (INIS)

    Tawara, H.; Itikawa, Y.; Nishimura, H.; Tanaka, H.; Nakamura, Y.

    1990-07-01

    Hydro-carbon molecules are abundantly produced when graphites are used as internal wall materials of hydrogen plasmas and strongly influence properties of low temperature plasmas near the edges as well as those of high temperature plasmas at the center. In this report, following simple description of the production mechanisms of hydro-carbon molecules under the interactions between graphite and hydrogen plasma, the present status of collision data for hydro-carbon molecules by electron impact is discussed and the relevant data are summarized in a series of figures and tables. It should also be noted that, in addition to fusion plasmas, these hydrocarbon data compiled here are quite useful in other applications such as plasma chemistry and material processing. (author)

  16. Alexela ostab Hydro Texaco tanklaketi / Gert D. Hankewitz

    Index Scriptorium Estoniae

    Hankewitz, Gert D.

    2006-01-01

    Kütusefirma Alexela Oil teatas, et ostab tanklaketi Hydro Texaco kõik Balti riikide tanklad. Diagramm: Alexela ja Hydro Texaco majandusnäitajad. Vt. samas: Statoili juht: ühinemine turul muutusi ei too

  17. Application of reliability methods in Ontario Hydro

    International Nuclear Information System (INIS)

    Jeppesen, R.; Ravishankar, T.J.

    1985-01-01

    Ontario Hydro have established a reliability program in support of its substantial nuclear program. Application of the reliability program to achieve both production and safety goals is described. The value of such a reliability program is evident in the record of Ontario Hydro's operating nuclear stations. The factors which have contributed to the success of the reliability program are identified as line management's commitment to reliability; selective and judicious application of reliability methods; establishing performance goals and monitoring the in-service performance; and collection, distribution, review and utilization of performance information to facilitate cost-effective achievement of goals and improvements. (orig.)

  18. Navigating the hydro market in Latin America

    International Nuclear Information System (INIS)

    Yermoli, C.A.

    1995-01-01

    The governments of most Latin American countries have yet to establish clear policies about the future ownership of existing generation assets, but they do expect future capacity to be largely developed by the private sector. There were at one time plans for many government-financed hydro projects in the area, but these projects produced much paper and little electricity. Present trends will take the area toward independent power projects, both hydro projects and thermal power projects. This article is a review of those present trends

  19. Stereoscopic 3D graphics generation

    Science.gov (United States)

    Li, Zhi; Liu, Jianping; Zan, Y.

    1997-05-01

    Stereoscopic display technology is one of the key techniques of areas such as simulation, multimedia, entertainment, virtual reality, and so on. Moreover, stereoscopic 3D graphics generation is an important part of stereoscopic 3D display system. In this paper, at first, we describe the principle of stereoscopic display and summarize some methods to generate stereoscopic 3D graphics. Secondly, to overcome the problems which came from the methods of user defined models (such as inconvenience, long modifying period and so on), we put forward the vector graphics files defined method. Thus we can design more directly; modify the model simply and easily; generate more conveniently; furthermore, we can make full use of graphics accelerator card and so on. Finally, we discuss the problem of how to speed up the generation.

  20. EPA Communications Stylebook: Graphics Guide

    Science.gov (United States)

    Includes standards and guidance for graphics typography, layout, composition, color scheme, appropriate use of charts and graphs, logos and related symbols, and consistency with the message of accompanied content.

  1. IAU Graphics Extension - Gnu C

    DEFF Research Database (Denmark)

    Denver, Troelz; Jørgensen, John Leif; Riis, Troels

    1999-01-01

    This document contains a description of the library GrxIau (former UtilVesa and UTILLE). The library acts as shell to the graphics commands used at the exercises at the course 50240 Image Analysis with Microcomputers....

  2. Digital Raster Graphics (DRG) Lambert

    Data.gov (United States)

    Kansas Data Access and Support Center — The Digital Raster Graphic-Lambert (DRG-Lam) is a raster image of a scanned USGS topographic map with the collar information clipped out, georeferenced to the...

  3. Storyboard dalam Pembuatan Motion Graphic

    OpenAIRE

    Satrya Mahardhika; A.F. Choiril Anam Fathoni

    2013-01-01

    Motion graphics is one category in the animation that makes animation with lots of design elements in each component. Motion graphics needs long process including preproduction, production, and postproduction. Preproduction has an important role so that the next stage may provide guidance or instructions for the production process or the animation process. Preproduction includes research, making the story, script, screenplay, character, environment design and storyboards. The storyboard will ...

  4. The graphics editor in ROOT

    International Nuclear Information System (INIS)

    Antcheva, Ilka; Brun, Rene; Hof, Carsten; Rademakers, Fons

    2006-01-01

    A well-designed Graphical User Interface (GUI) has critical importance in any computer application. The user interface is where the end users and the complex system intersect. An effective interface design can make a powerful and complex system, such as ROOT, easy and intuitive to learn and operate. This paper describes the main goals we defined and the design solution we found developing the graphics editor in ROOT

  5. Randomness in Contemporary Graphic Art

    OpenAIRE

    Zavřelová, Veronika

    2016-01-01

    Veronika Zavřelová Bachelor thesis Charles University in Prague, Faculty of Education, Department of Art Education Randomness in contemporary graphic art imaginative picture card game ANNOTATION This (bachelor) thesis concerns itself with a connection between verbal and visual character system within the topic of Randomness in contemporary graphic art - imaginative picture card game. The thesis is mainly based on the practical part - exclusively created card game Piktim. The card game uses as...

  6. Graphic design of pinhole cameras

    Science.gov (United States)

    Edwards, H. B.; Chu, W. P.

    1979-01-01

    The paper describes a graphic technique for the analysis and optimization of pinhole size and focal length. The technique is based on the use of the transfer function of optical elements described by Scott (1959) to construct the transfer function of a circular pinhole camera. This transfer function is the response of a component or system to a pattern of lines having a sinusoidally varying radiance at varying spatial frequencies. Some specific examples of graphic design are presented.

  7. The development of biodiversity conservation measures in China's hydro projects: A review.

    Science.gov (United States)

    Bai, Ruiqiao; Liu, Xuehua; Liu, Xiaofei; Liu, Lanmei; Wang, Jianping; Liao, Sihui; Zhu, Annah; Li, Zhouyuan

    2017-11-01

    The hydropower capacity of China ranks first in the world and accounts for approximately 20% of the total energy production in the country. While hydropower has substantially contributed to meeting China's renewable energy targets and providing clean energy to rural areas, the development of hydropower in China has been met with significant controversy. Ecologically, hydro projects alter the landscape, with potential impacts to the country's aquatic biodiversity. Over the past four decades in China, various mainstream opinions and misunderstandings have been presented concerning how to alleviate the negative impacts of hydro projects on aquatic ecosystems. This article reviews research concerning potential mitigation measures to enhance aquatic biodiversity conservation in hydro projects in China. Based on the academic attention such research has attracted, three technical measures for aquatic biodiversity conservation are considered: (1) fish passages, (2) restocking efforts and (3) river and lake renovations. This article provides a historical comparison of these three practices in China to demonstrate the advantages and disadvantages of each method. The article also reviews the relevant legislation, regulations and technical guidelines concerning China's hydro projects dating back to 1979. The dynamics in research, publications, and patents concerning these three mitigation measures are summarized to demonstrate their technological developments in the context of legislative and policy advances. Data were gathered through the China Knowledge Resource Integrated Database and the State Intellectual Property Office of the People's Republic of China. Based on the analysis provided, the article recommends an expansion of China's environmental certification system for hydro projects, more robust regional legislation to bolster the national framework, the cooperation between upstream and downstream conservation mechanisms, and better monitoring to determine the efficacy

  8. Design concept of Hydro cascade control system

    International Nuclear Information System (INIS)

    Fustik, Vangel; Kiteva, Nevenka

    2006-01-01

    In this paper a design concept of the comple hydro cascade scheme is presented with the design parameters of the main technical features. The cascade control system architecture is designed considering up-to-date communication and information technology. The control algorithm is based on Pond Level Control and Economic Load Allocation concepts.

  9. Ontario Hydro's plan for used nuclear fuel

    International Nuclear Information System (INIS)

    Stevens-Guille, P.D.; Howes, H.A.; Freire-Canosa, J.

    1992-01-01

    A comprehensive plan for the management of used nuclear fuel has been published by Ontario Hydro. In this paper current practices are discussed and actions leading to disposal in a repository are outlined. Extended storage options are discussed should disposal be delayed

  10. Using historic earnings to value hydro energy

    International Nuclear Information System (INIS)

    Robson, I.A.; Whittington, H.W.

    1993-01-01

    This article briefly presents a technique for assigning a value to the water held in and removed from the hydro reservoir. Using historic earnings as the basis for a series of equations, it aims to give engineers trading energy a reliable means of placing a value on what is effectively a ''free'' resource. (Author)

  11. IPPSO raises Hydro exports in smog negotiations

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Independent Power Producers of Ontario (IPPSO) requested federal and provincial committees negotiating atmospheric emission standards to review Ontario Hydro's export wheeling plans. IPPSO alleges that Ontario Hydro is preparing to apply pressure on the Canadian export approval process, and is building up a major effort that will increase emissions, contrary to the objectives embodied in a number of environment protection projects such as the Ontario Smog Plan, The Federal-Provincial NOx Management Plan, the Strategic Options Plan, or the Convention on Long-Range Transboundary Air Pollution Draft NOx Protocol Negotiations. IPPSO alleges further that while Ontario Hydro is one of Canada's largest single emitter of greenhouse gases NOx, and SO 2 , and as a public sector corporation it should be the most amenable to serving the public good, the Corporation is doing exactly the opposite: it actively prevents production of electricity from less polluting sources. It is IPPSO's contention that Ontario Hydro's desire to control the Ontario market could come at significant cost to the environment

  12. Analyze the factors effecting the development of hydro power projects in hydro rich regions of India

    Directory of Open Access Journals (Sweden)

    Ameesh Kumar Sharma

    2016-09-01

    Full Text Available Power is considered as the major back bone for all the nations throughout the world including India on the basis of which development of the country depends. If a country has the resources to generate the power at competitive price in that case the people of the country get the benefits in terms of improvement in their social and economical life. When we talk about India, various locations in the country where still there is no electricity people are living in dark without having the access of the modern technology. The total hydro power potential of India is 1, 50,000 MW out of this total hydro potential only 40,195 MW is exploited till 2014. More than 80% of the total hydro potential of the country is lying in the western Himalayan states (Jammu and Kashmir, Himachal Pradesh, Uttrakhand and Arunachal Pradesh. Small hydro projects are also playing a very important role in the modern world for the development of the remote areas which are not main grid connected specially in western Himalayan region of India. India has a total potential 19,749 MW of small hydro projects and of this total potential only 3990.9 MW harnessed till 2014. Ministry of new and renewable energy in India is also providing special incentives to hydro rich states of India. In this research article we are taken the case study of the small hydro projects in the western Himalayan region because theses states are having vast small hydro potential which is still needed to be harnessed. So, it is very important to identify the factors which are effecting the development of these small ventures especially in western Himalayan region in India.

  13. Twenty-five years of research in hydro-ecology at the EDF research and development division

    International Nuclear Information System (INIS)

    Gosse, Ph.

    1999-01-01

    Hydro-ecology (or aquatic ecology) is the study of aquatic systems in their interacting aspects: physical, chemical and biological. The creation in 1974 of the Environment Department at EDF Research and Development Division marked the start in France of quantitative hydro-ecology applied to power generation installations. The studies developed around several main themes, determined both the expansion of the nuclear programme and by changes in French environmental regulations, in particular the 1976 law on impact studies, the 1984 fishing and hydro-biology law and the 1992 water law. In this framework, he effect of artificial warming of rivers, eutrophication of continental and marine waters, transfers of mineral micro-pollutants and radionuclides in rivers, and problems specific to hydropower installations such as guaranteed in stream flow or fish pass design, have been studies. This work, conducted in collaboration with many other laboratories, has led to the development of original quantitative approaches, notably in the field of numerical modelling. The paper selects several of the tools developed whose scope of application is wider than the environment and management of thermal or hydropower plants. Two major applications grouping the experience acquired in hydro-ecology are presented: the AGIRE software and the global environment study of the Singrauli area in India. (author)

  14. Transforming Graphical System Models to Graphical Attack Models

    DEFF Research Database (Denmark)

    Ivanova, Marieta Georgieva; Probst, Christian W.; Hansen, Rene Rydhof

    2016-01-01

    Manually identifying possible attacks on an organisation is a complex undertaking; many different factors must be considered, and the resulting attack scenarios can be complex and hard to maintain as the organisation changes. System models provide a systematic representation of organisations...... approach to transforming graphical system models to graphical attack models in the form of attack trees. Based on an asset in the model, our transformations result in an attack tree that represents attacks by all possible actors in the model, after which the actor in question has obtained the asset....

  15. Configurable software for satellite graphics

    Energy Technology Data Exchange (ETDEWEB)

    Hartzman, P D

    1977-12-01

    An important goal in interactive computer graphics is to provide users with both quick system responses for basic graphics functions and enough computing power for complex calculations. One solution is to have a distributed graphics system in which a minicomputer and a powerful large computer share the work. The most versatile type of distributed system is an intelligent satellite system in which the minicomputer is programmable by the application user and can do most of the work while the large remote machine is used for difficult computations. At New York University, the hardware was configured from available equipment. The level of system intelligence resulted almost completely from software development. Unlike previous work with intelligent satellites, the resulting system had system control centered in the satellite. It also had the ability to reconfigure software during realtime operation. The design of the system was done at a very high level using set theoretic language. The specification clearly illustrated processor boundaries and interfaces. The high-level specification also produced a compact, machine-independent virtual graphics data structure for picture representation. The software was written in a systems implementation language; thus, only one set of programs was needed for both machines. A user can program both machines in a single language. Tests of the system with an application program indicate that is has very high potential. A major result of this work is the demonstration that a gigantic investment in new hardware is not necessary for computing facilities interested in graphics.

  16. Nonlinear modeling and dynamic analysis of hydro-turbine governing system in the process of load rejection transient

    International Nuclear Information System (INIS)

    Zhang, Hao; Chen, Diyi; Xu, Beibei; Wang, Feifei

    2015-01-01

    Graphical abstract: Nonlinear dynamic transfer coefficients are introduced to the hydro-turbine governing system. In the process of load reject ion transient, the nonlinear dynamical behaviors of the system are studied in detail. - Highlights: • A novel mathematical model of a hydro-turbine governing system is established. • The process of load rejection transient is considered. • Nonlinear dynamic transfer coefficients are introduced to the system. • The bifurcation diagram with the variable t has better engineering significance. • The nonlinear dynamical behaviors of the system are studied in detail. - Abstract: This article pays attention to the mathematical modeling of a hydro-turbine governing system in the process of load rejection transient. As a pioneer work, the nonlinear dynamic transfer coefficients are introduced in a penstock system. Considering a generator system, a turbine system and a governor system, we present a novel nonlinear dynamical model of a hydro-turbine governing system. Fortunately, for the unchanged of PID parameters, we acquire the stable regions of the governing system in the process of load rejection transient by numerical simulations. Moreover, the nonlinear dynamic behaviors of the governing system are illustrated by bifurcation diagrams, Poincare maps, time waveforms and phase orbits. More importantly, these methods and analytic results will present theoretical groundwork for allowing a hydropower station in the process of load rejection transient

  17. VAX Professional Workstation goes graphic

    International Nuclear Information System (INIS)

    Downward, J.G.

    1984-01-01

    The VAX Professional Workstation (VPW) is a collection of programs and procedures designed to provide an integrated work-station environment for the staff at KMS Fusion's research laboratories. During the past year numerous capabilities have been added to VPW, including support for VT125/VT240/4014 graphic workstations, editing windows, and additional desk utilities. Graphics workstation support allows users to create, edit, and modify graph data files, enter the data via a graphic tablet, create simple plots with DATATRIEVE or DECgraph on ReGIS terminals, or elaborate plots with TEKGRAPH on ReGIS or Tektronix terminals. Users may assign display error bars to the data and interactively plot it in a variety of ways. Users also can create and display viewgraphs. Hard copy output for a large network of office terminals is obtained by multiplexing each terminal's video output into a recently developed video multiplexer front ending a single channel video hard copy unit

  18. Fractal geometry and computer graphics

    CERN Document Server

    Sakas, Georgios; Peitgen, Heinz-Otto; Englert, Gabriele

    1992-01-01

    Fractal geometry has become popular in the last 15 years, its applications can be found in technology, science, or even arts. Fractal methods and formalism are seen today as a general, abstract, but nevertheless practical instrument for the description of nature in a wide sense. But it was Computer Graphics which made possible the increasing popularity of fractals several years ago, and long after their mathematical formulation. The two disciplines are tightly linked. The book contains the scientificcontributions presented in an international workshop in the "Computer Graphics Center" in Darmstadt, Germany. The target of the workshop was to present the wide spectrum of interrelationships and interactions between Fractal Geometry and Computer Graphics. The topics vary from fundamentals and new theoretical results to various applications and systems development. All contributions are original, unpublished papers.The presentations have been discussed in two working groups; the discussion results, together with a...

  19. Graphical programming of telerobotic tasks

    International Nuclear Information System (INIS)

    Small, D.E.; McDonald, M.J.

    1997-01-01

    With a goal of producing faster, safer, and cheaper technologies for nuclear waste cleanup, Sandia is actively developing and extending intelligent systems technologies. Graphical Programming is a key technology for robotic waste cleanup that Sandia is developing for this goal. This paper describes Sancho, Sandia most advanced Graphical Programming supervisory software. Sancho, now operational on several robot systems, incorporates all of Sandia's recent advances in supervisory control. Sancho, developed to rapidly apply Graphical Programming on a diverse set of robot systems, uses a general set of tools to implement task and operational behavior. Sancho can be rapidly reconfigured for new tasks and operations without modifying the supervisory code. Other innovations include task-based interfaces, event-based sequencing, and sophisticated GUI design. These innovations have resulted in robot control programs and approaches that are easier and safer to use than teleoperation, off-line programming, or full automation

  20. Cartooning History: Canada's Stories in Graphic Novels

    Science.gov (United States)

    King, Alyson E.

    2012-01-01

    In recent years, historical events, issues, and characters have been portrayed in an increasing number of non-fiction graphic texts. Similar to comics and graphic novels, graphic texts are defined as fully developed, non-fiction narratives told through panels of sequential art. Such non-fiction graphic texts are being used to teach history in…

  1. An Opening: Graphic Design's Discursive Spaces.

    Science.gov (United States)

    Blauvelt, Andrew

    1994-01-01

    Introduces a special issue on critical histories of graphic design with a review of the particular problems identified with the history of graphic design as a field of study and the emerging discipline of graphic design history. Makes a case for the examination of graphic design through its relationships with larger discourses. (SR)

  2. Antinomies of Semiotics in Graphic Design

    Science.gov (United States)

    Storkerson, Peter

    2010-01-01

    The following paper assesses the roles played by semiotics in graphic design and in graphic design education, which both reflects and shapes practice. It identifies a series of factors; graphic design education methods and culture; semiotic theories themselves and their application to graphic design; the two wings of Peircian semiotics and…

  3. Graphic Design Career Guide 2. Revised Edition.

    Science.gov (United States)

    Craig, James

    The graphic design field is diverse and includes many areas of specialization. This guide introduces students to career opportunities in graphic design. The guide is organized in four parts. "Part One: Careers in Graphic Design" identifies and discusses the various segments of the graphic design industry, including: Advertising, Audio-Visual, Book…

  4. Graphic Journeys: Graphic Novels' Representations of Immigrant Experiences

    Science.gov (United States)

    Boatright, Michael D.

    2010-01-01

    This article explores how immigrant experiences are represented in the narratives of three graphic novels published in the last decade: Tan's (2007) "The Arrival," Kiyama's (1931/1999) "The Four Immigrants Manga: A Japanese Experience in San Francisco, 1904-1924," and Yang's (2006) "American Born Chinese." Through a theoretical lens informed by…

  5. Graphics Technology Study. Volume 1. State of Graphics Technology

    Science.gov (United States)

    1986-12-01

    reaction of special heat sensitive paper when exposed to the heated elements of a thermal print head. Copy quality was poor due to characteristics...Vendors are now attempting to offer smaller units aimed at applications such as typography , graphic arts, CAD, and office automation. The key element in

  6. hydroPSO: A Versatile Particle Swarm Optimisation R Package for Calibration of Environmental Models

    Science.gov (United States)

    Zambrano-Bigiarini, M.; Rojas, R.

    2012-04-01

    Optimisation (IPSO), Fully Informed Particle Swarm (FIPS), and weighted FIPS (wFIPS). Finally, an advanced sensitivity analysis using the Latin Hypercube One-At-a-Time (LH-OAT) method and user-friendly plotting summaries facilitate the interpretation and assessment of the calibration/optimisation results. We validate hydroPSO against the standard PSO algorithm (SPSO-2007) employing five test functions commonly used to assess the performance of optimisation algorithms. Additionally, we illustrate how the performance of the optimization/calibration engine is boosted by using several of the fine-tune options included in hydroPSO. Finally, we show how to interface SWAT-2005 with hydroPSO to calibrate a semi-distributed hydrological model for the Ega River basin in Spain, and how to interface MODFLOW-2000 and hydroPSO to calibrate a groundwater flow model for the regional aquifer of the Pampa del Tamarugal in Chile. We limit the applications of hydroPSO to study cases dealing with surface water and groundwater models as these two are the authors' areas of expertise. However, based on the flexibility of hydroPSO we believe this package can be implemented to any model code requiring some form of parameter estimation.

  7. Trend Monitoring System (TMS) graphics software

    Science.gov (United States)

    Brown, J. S.

    1979-01-01

    A prototype bus communications systems, which is being used to support the Trend Monitoring System (TMS) and to evaluate the bus concept is considered. A set of FORTRAN-callable graphics subroutines for the host MODCOMP comuter, and an approach to splitting graphics work between the host and the system's intelligent graphics terminals are described. The graphics software in the MODCOMP and the operating software package written for the graphics terminals are included.

  8. Collection Of Software For Computer Graphics

    Science.gov (United States)

    Hibbard, Eric A.; Makatura, George

    1990-01-01

    Ames Research Graphics System (ARCGRAPH) collection of software libraries and software utilities assisting researchers in generating, manipulating, and visualizing graphical data. Defines metafile format containing device-independent graphical data. File format used with various computer-graphics-manipulation and -animation software packages at Ames, including SURF (COSMIC Program ARC-12381) and GAS (COSMIC Program ARC-12379). Consists of two-stage "pipeline" used to put out graphical primitives. ARCGRAPH libraries developed on VAX computer running VMS.

  9. Hydro Ottawa achieves Smart Meter milestone

    International Nuclear Information System (INIS)

    Anon.

    2008-01-01

    As Ontario's second largest municipal electricity company, Hydro Ottawa serves more than 285,000 residential and business customers in the city of Ottawa and the village of Casselman. Since 2006, the utility has installed more than 230,000 Smart Meters throughout its service territory in an effort to provide better services to its customers. This initiative represents the largest operational advanced metering infrastructure network in Canada. This move was necessary before time-of-use rates can be implemented in Ottawa. The Smart Meters deliver data wirelessly to Hydro Ottawa's Customer Information System for billing and eliminating manual readings. The Smart Meters are designed to promote more efficient use of electricity. The Government of Ontario has passed legislation requiring the installation of Smart Meters throughout the province by the end of 2010

  10. Small hydro generation building block profile

    International Nuclear Information System (INIS)

    2003-01-01

    Concise business information on small hydro generation in British Columbia was presented in this document. It was noted that the steep terrain within the province and its abundant precipitation provides numerous opportunities for hydropower generation in British Columbia. The hydroelectric sector produces approximately 90 per cent of the electrical demand in the province. The document focusses on small hydro sites producing between 0.5 and 50 mega watts (MW) and not having large water storage. In the first section, an overview of the electricity sector in the province is provided. The following issues are examined in subsequent sections: land resources; infrastructure requirements; sales market; labour market; the regulatory regime; development factors; non-governmental aspects; investments and economics; the present status and future outlook of the industry; and, government revenue. Input-output tables were also provided. 22 refs., 5 tabs., 4 figs

  11. Unmanned operation of Hydro Power Plants

    International Nuclear Information System (INIS)

    Regula, E.

    2008-01-01

    Intentions to launch unmanned operation are no news, the very first occurred in Hydro Power Plants (HPP) at the time when the first computer technology was implemented into process of power generation, i.e. no later than in 1960 s . ENEL entering Slovenske elektrarne not only revived but significantly accelerated the implementation process of unmanned operation. Experience of ENEL says that unmanned operation means better reliability of the HPP and this is the priority. (author)

  12. Development of coal hydro gasification technology

    International Nuclear Information System (INIS)

    Itoh, Kazuo; Nomura, Kazuo; Asaoka, Yoshikiyo; Kato, Shojiro; Seo, Tomoyuki

    1997-01-01

    Taking a potential future decrease in natural gas supply into consideration, we are looking for a way to secure a stable supply of high quality substitute natural gas made from coal (which occurs abundantly throughout the world) in large volumes at low cost. We are working towards our goal of commercializing coal hydro gasification technology in the 2010's and have started developing elemental technology from FY, 1996 as a part of the governmental new energy program. (au)

  13. Financing options for small hydro projects

    International Nuclear Information System (INIS)

    Shepherd, J.C.

    1993-01-01

    Examples and techniques used to enhance the ability to finance small hydro projects, or to finance them in non-standard ways, were discussed. It was suggested that factors that motivate investors, namely the maximization of the rate of return on capital, and minimization of risk, should be the primary concern for any would-be developer. A responsible, conservative approach to financial projections was recommended as the best to impress potential investors

  14. Fluid simulation for computer graphics

    CERN Document Server

    Bridson, Robert

    2008-01-01

    Animating fluids like water, smoke, and fire using physics-based simulation is increasingly important in visual effects, in particular in movies, like The Day After Tomorrow, and in computer games. This book provides a practical introduction to fluid simulation for graphics. The focus is on animating fully three-dimensional incompressible flow, from understanding the math and the algorithms to the actual implementation.

  15. Storyboard dalam Pembuatan Motion Graphic

    Directory of Open Access Journals (Sweden)

    Satrya Mahardhika

    2013-10-01

    Full Text Available Motion graphics is one category in the animation that makes animation with lots of design elements in each component. Motion graphics needs long process including preproduction, production, and postproduction. Preproduction has an important role so that the next stage may provide guidance or instructions for the production process or the animation process. Preproduction includes research, making the story, script, screenplay, character, environment design and storyboards. The storyboard will be determined through camera angles, blocking, sets, and many supporting roles involved in a scene. Storyboard is also useful as a production reference in recording or taping each scene in sequence or as an efficient priority. The example used is an ad creation using motion graphic animation storyboard which has an important role as a blueprint for every scene and giving instructions to make the transition movement, layout, blocking, and defining camera movement that everything should be done periodically in animation production. Planning before making the animation or motion graphic will make the job more organized, presentable, and more efficient in the process.  

  16. A Poetics of Graphic Design?

    Science.gov (United States)

    Baker, Steve

    1994-01-01

    Proposes that the work of the French feminist writers Helene Cixous and Luce Irigaray could serve as the basis for devising a more imaginative form of critical writing that might help to draw the history and practice of graphic design into a closer and more purposeful relation. (SR)

  17. Recorded Music and Graphic Design.

    Science.gov (United States)

    Osterer, Irv

    1998-01-01

    Reviews the history of art as an element of music-recording packaging. Describes a project in which students design a jacket for either cassette or CD using a combination of computerized and traditional rendering techniques. Reports that students have been inspired to look into careers in graphic design. (DSK)

  18. GRAPHIC INTERFACES FOR ENGINEERING APPLICATIONS

    Directory of Open Access Journals (Sweden)

    Ion PANA,

    2012-05-01

    Full Text Available Using effective the method of calculating Fitness for Service requires the achievement of graphical interfaces. This paper presents an example of such interfaces, made with Visual Basic program and used in the evaluation of pipelines in a research contract [4

  19. Overview of Graphical User Interfaces.

    Science.gov (United States)

    Hulser, Richard P.

    1993-01-01

    Discussion of graphical user interfaces for online public access catalogs (OPACs) covers the history of OPACs; OPAC front-end design, including examples from Indiana University and the University of Illinois; and planning and implementation of a user interface. (10 references) (EA)

  20. Analysis of a pico tubular-type hydro turbine performance by runner blade shape using CFD

    Science.gov (United States)

    Park, J. H.; Lee, N. J.; Wata, J. V.; Hwang, Y. C.; Kim, Y. T.; Lee, Y. H.

    2012-11-01

    There has been a considerable interest recently in the topic of renewable energy. This is primarily due to concerns about environmental impacts of fossil fuels. Moreover, fluctuating and rising oil prices, increase in demand, supply uncertainties and other factors have led to increased calls for alternative energy sources. Small hydropower, among other renewable energy sources, has been evaluated to have adequate development value because it is a clean, renewable and abundant energy resource. In addition, small hydropower has the advantage of low cost development by using rivers, agricultural reservoirs, sewage treatment plants, waterworks and water resources. The main concept of the tubular-type hydro turbine is based on the difference in water pressure levels in pipe lines, where the energy which was initially wasted by using a reducing valve at the pipeline of waterworks, is collected by turbine in the hydro power generator. In this study, in order to acquire the performance data of a pico tubular-type hydro turbine, the output power, head and efficiency characteristics by different runner blade shapes are examined. The pressure and velocity distributions with the variation of guide vane and runner vane angle on turbine performance are investigated by using a commercial CFD code.

  1. Risk assessment of hydro projects in the face of climate change - a case study

    International Nuclear Information System (INIS)

    Cheng, W.; Kilduff, T.

    2008-01-01

    As the IPCC's Climate Change 2007 report made clear, warming of the Climate System is unequivocal. It is also clear that warming of the land surface can significantly affect the hydrological systems of snow-fed rivers. Thus, it is prudent to consider the potential impacts of climate change when conducting cost-benefit analysis of hydro-electric system capital improvements. This paper evaluates the benefits to Seattle City Light, Seattle's municipal utility, of an upgrade to one of its hydro-electric projects, not on the basis, as is common, of historical flow data, but on the basis of modeled flows under a specific climate change scenario. Another novelty of the paper is that the analysis relies not on one 'normal' or average flow, but on an ensemble of flows that reflect the range of hydro conditions that might be anticipated under the climate scenario. Although the nature of the anticipated impacts of climate in the Northwest are such that the results are not markedly different from ignoring them, the paper raises a number of interesting issues that such analysis should typically address. (author)

  2. Impact of climate change on operations and planning of Hydro-Quebec's generation system

    International Nuclear Information System (INIS)

    Raymond, M.P.; Houle, B.; Robert, S.

    2008-01-01

    Hydraulic resources currently account for more than 95 per cent of Hydro-Quebec's generation capacity. Hydro-Quebec also plans to purchase more wind power in the future. However, the utility wind and hydroelectric resources will be affected by climatic change in the future. This paper outlined research needed by hydroelectric and water resource managers in order to accurately determine the impacts of climatic change. Parameters included changes in annual and seasonal distribution as well as changes in the variability of natural inflows. The research will be used to determine the configuration of new projects as well as the refurbishment and replacement of existing infrastructure. Load profiles for the future indicate that electricity use will change, with less heating needed in winter, and more air conditioning required in summer months. The Delta method was used to determine impacts of future inflows and hydrological regimes. A case study of climate change impacts and management strategies for the Outardes River system up to the year 2050 was presented. The study showed that higher inflows are expected to produce more energy. Maintenance planning and flood control techniques were also discussed. The study showed that the effects of climate change on each of Hydro-Quebec's systems is expected to follow a similar pattern to the Outardes system. tabs., figs

  3. A Spatial Decision Support System to incorporate hydro-economic modeling results in the management of water resources under decentralized institutional arrangements in a semiarid reservoir region in Brazil

    Science.gov (United States)

    Alcoforado de Moraes, Márcia; Silva, Gerald; Siegmund-Schultze, Marianna

    2017-04-01

    The integration of economic and hydrological components in models, aimed to support evaluating alternatives of water allocation policies, is promising, though, challenging. Worldwide, these models have been used primarily in academia, and so far seldom by water managers for practical purposes. Ideally, the models should be available through a Decision Support System. The São Francisco River Basin in Northeast of Brazil has around 48% of its area in a semi-arid region. Irrigation and public water supply are the primary water use sectors, along with hydropower utilization. The water for electricity generation is stored in two large reservoirs, built 30 to 50 years ago under the premise of regulating flows for hydropower and controlling floods. Since 20 years, however, the law stipulates the multiple uses paradigm in a participatory and decentralized way. So far, only few rules laid down. Studies revealed that most of the respective institutions still needed to update their routines to the new paradigm. A hydro-economic model was developed and applied in order to determine the economically optimal water allocation of main users in that semiarid reservoir region. In order to make this model available to the decision makers, a minimum required is some form of manipulating data entry and output as well as some graphical interfaces. We propose and present the first features of a Spatial Decision Support System (SDSS) with dedicated hydro-economic modules in a web-based Geographic Information System (GIS) environment for integrated water resource management. The open model platform should include geoprocessing tasks and water user related data management. The hydro-economic geoprocessing will link to generic optimization modeling systems, such as EXCEL Solver, GAMS and MATLAB. The institutions are deliberating or deciding over water allocation at different scales could use the generated information on potential economic benefits as a transparent basis for discussion. In

  4. TEKLIB, Tektronix Graphics Subroutine Library

    International Nuclear Information System (INIS)

    Wolf, M.L.

    1987-01-01

    1 - Description of program or function: TEKLIB is a library of subroutines that produces graphical output on all Tektronix terminals with model numbers from 4010 through 4115. The application program identifies the model number in the initialization subroutine, GRSTRT, and then uses this number as a flag throughout the run to tailor the graphical output to that specific device. Output includes lines, markers, text, polygons, and panels. Graphic input is supported on all terminals. 2 - Method of solution: TEKLIB uses two coordinate systems, viewport and world, to generate graphic images on the screen. Viewport coordinates refer to an imaginary rectangular grid on the display screen surface. The world coordinate system is a rectangular grid on any x-y plane, defined by the application program. The rectangular portion of the x-y plane specified, termed a w indow , is projected onto a rectangular region of the screen, called a v iewport . In addition to 2-D graphics, TEKLIB also provides subroutines for drawing projections of 3-D objects. The application program first defines a point in space to look at the v iew point , and the direction and distance from that point to the observer's position. A viewing transformation is performed on each x,y,z point to project it onto a v iew plane , a plane perpendicular to the line of sight and passing through the view point. This view plane then becomes the x-y plane of the world window which is mapped into the viewport. 3 - Restrictions on the complexity of the problem: TEKLIB does not attempt to emulate attributes such as line style and marker type in software if the terminal does not support those attributes in hardware

  5. Water resources management using the WRF-Hydro modelling system: Case-study of the Tono dam in West Africa

    Directory of Open Access Journals (Sweden)

    E. Naabil

    2017-08-01

    Full Text Available Water resources are a major source of economic development for most West African (WA countries. There is, however inadequate information on these resources for the purposes of planning, decision-making and management. This paper explores the potential for using a state of the art hydrological model (WRF-Hydro in a fully coupled (i.e. land surface hydrology-atmosphere mode to assess these water resources, particularly the Tono basin in Ghana. The WRF-Hydro model is an enhanced version of the Weather Research and Forecasting model (WRF which allows simulating river discharge. A 2-domain configuration is chosen: an outer domain at 25 km horizontal resolution encompassing the West African Region and an inner domain at 5 km horizontal resolution centered on the Tono basin. The infiltration partition parameter and Manning’s roughness parameter were calibrated to fit the WRF-Hydro simulated discharge with the observed data. The simulations were done from 1999 to 2003, using 1999 as a spin-up period. The results were compared with TRMM precipitation, CRU temperature and available observed hydrological data. The WRF-Hydro model captured the attributes of the “observed” streamflow estimate; with Nash-Sutcliff efficiency (NSE of 0.78 and Pearson’s correlation of 0.89. Further validation of model results is based on using the output from the WRF-Hydro model as input into a water balance model to simulate the dam levels. WRF-Hydro has shown the potential for use in water resource planning (i.e. with respect to streamflow and dam level estimation. However, the model requires further improvement with respect to calibration of model parameters (e.g. baseflow and saturated hydraulic conductivity considering the effect of the accumulation of model bias in dam level estimation.

  6. HydroSoft coil versus HydroCoil for endovascular aneurysm occlusion study: A single center experience

    International Nuclear Information System (INIS)

    Guo Xinbin; Fan Yimu; Zhang Jianning

    2011-01-01

    Background and purpose: The HydroCoil Embolic System (HES) was developed to reduce recurrences of aneurysms relative to platinum coils. But the HydroCoil Embolic System was characterized with many limitations. The manufacturer had recognized the challenge and recently a new design of hydrogel-coated coil-HydroSoft has become available in the market as the new generation HydroCoil. We reported our initial experience using HydroSoft coil versus HydroCoil in our center. Methods: 75 aneurysms embolized primarily using HydroSoft Coils from July 2008 to May 2009 were compared with 66 volume- and shape-matched aneurysms treated with HydroCoils from March 2006 to August 2008. Outcome measures included length and number of coils used, contrast volume, and length of hospital stay. During embolization, a stable framework was first established with bare coils, and hydrogel-coated coils were used subsequently to increase the packing density. Follow-up angiographic results 6 months after treatment were evaluated among some of the patients. Results: Successful coil embolization was achieved in all patients. There were no differences in average total coil length used per aneurysm. There were no differences in length of hospital stay and packing density. HydroSoft coils were more suitable using as the finishing or final coil. HydroSoft coil decreased the procedure-related retreated rates, and aneurysm packing was finished with soft, flexible HydroSoft coil and decreased the neck remnant rates. Follow-up angiography in HydroSoft-treated patients at 6 months revealed aneurysm stability without significant residual neck. Conclusions: HydroSoft coil allowed us to deploy coated coils with good packing density. A slight expansion of these coils at the neck can be expected to reduce neck remnant and potentially inhibit recurrence.

  7. Small-scale hydro-electric scheme in Roches, Switzerland

    International Nuclear Information System (INIS)

    Hausmann, M.

    2006-01-01

    The small hydropower plant (SHPP) project 'PCH Roches' is planned to be built in Roches, a small village located in the Jura region of the canton of Bern. The goal of this undertaking is to reactivate a site with hydro potential of the river Birs on a section that was already well exploited by some ancient SHPP (since 1953 or probably even earlier). Several modifications were performed on this plant over the years; not all contributed positively on its production figures. Following a transfer of the water rights in 1987, claims became loud against the owner to perform maintenance on the river banks and to modify the weir such that a free passage for the fishes will be granted. Those issues contributed to inflate a conflict which ended in the repeal of the water rights and a total plant shut down in 2001. The new project plans to reuse the existing pen stock and to carry out some refurbishing activities to grant security and better performance. The weir and the intake structure are also redesigned such that the water storage can be somewhat raised for normal operation; a weir gate will however allow to better discharge the river in flood situations. A new turbine house will be erected at the current location where the tail water pen stock rejoins the river. Hence, the existing old turbine house will be obsolete and the upper and lower pen stock sections are to be linked with each other. Limited by the existing pen stock size, the new plant is expected to produce some 50 kW power and 362,000 kWh/year. This represents an increase in energy generation of around 200% compared with the ancient SHPP. Gross head is 5.38 m, net head 4.12 m with a turbine flow of at least 1.6 m 3 /s. The expected energy sales price applicable to this project reaches about 0.17 CHF/kWh as per the current tariffs set by the grid owner. This project calls for the building of a state-of-the-art SHPP. It will avoid the total dismantling of the existing works to take place and allow the small

  8. An Overview of Power Topologies for Micro-hydro Turbines

    DEFF Research Database (Denmark)

    Nababan, Sabar; Muljadi, E.; Blaabjerg, Frede

    2012-01-01

    This paper is an overview of different power topologies of micro-hydro turbines. The size of micro-hydro turbine is typically under 100kW. Conventional topologies of micro-hydro power are stand-alone operation used in rural electrical network in developing countries. Recently, many of micro-hydro...... power generations are connected to the distribution network through power electronics (PE). This turbines are operated in variable frequency operation to improve efficiency of micro-hydro power generation, improve the power quality, and ride through capability of the generation. In this paper our...... discussion is limited to the distributed generation. Like many other renewable energy sources, the objectives of micro-hydro power generation are to reduce the use of fossil fuel, to improve the reliability of the distribution system (grid), and to reduce the transmission losses. The overview described...

  9. Reverse-engineering graphical innovation: an introduction to graphical regimes

    Directory of Open Access Journals (Sweden)

    Dominic Arsenault

    2013-03-01

    Full Text Available Technological innovation in the video games industry is a rich area of research that has barely been explored as of yet. Gamers are always clamoring for novelty and a remedy to the oft-decried “sequelitis” that “plagues” the industry, while game publishers and platform holders secretly plan a next-gen platform to capture the ever-shifting market. In this light, the importance of graphics cannot be understated, as it is usually taken for granted in game historiography that “[g]ame graphics were, and to a large extent still are, the main criteria by which advancing video game technology is benchmarked” (Wolf, 2003, p.53.

  10. Small hydro-electric potential: west Poverty Bay region

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    This study has identified six schemes in the Bay of Plenty Electric Power Board area and two in the Poverty Bay Electric Power Board area, of which five and one, respectively, are below the economic limit of $2400/kW suggested by the Ministry of Works and Development as of December 1979. Of these, only three appear both economically and environmentally acceptable. The Takaputahi and Torere schemes are not likely to proceed if the Ministry of Works and Development continue with their plans to develop the Motu River. Furthermore, the Motu Falls scheme is unlikely to proceed for environmental reasons. The schemes identified are not very attractive on the national scale and could not be justified on local terms. However, a detailed feasibility study of the Takaputahi/Torere diversion should be undertaken prior to a decision being made to proceed with the Motu development, or if the proposals are dropped. The present low load and slow growth of the area is such that prior to a small hydro-electric scheme being built, there would need to be an established demand for power.

  11. Turtle Graphics implementation using a graphical dataflow programming approach

    OpenAIRE

    Lovejoy, Robert Steven

    1992-01-01

    Approved for public release; distribution is unlimited This thesis expands the concepts of object-oriented programming to implement a visual dataflow programming language. The main thrust of this research is to develop a functional prototype language, based upon the Turtle Graphics tool provided by LOGO programming language, for children to develop both their problem solving skills as well as their general programming skills. The language developed for this thesis was implemented in the...

  12. Facts and figures: a graphical analysis of world energy up to 1991

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Various data are given in graphical form on primary energy production, consumption and on reserves. The energy carriers considered are: oil, gas, coal, hydro and nuclear (uranium). The subdivision of countries is done in categories like developing countries, OECD, Eastern Europe, OPEC or alternatively as geographical regions. On page 18 there is a section on 'nuclear power electricity generation capacity'. Another group of data are on non-energy figures like GPD and trade; here the partners are the groups 'developing countries' vs 'industrialized countries'

  13. Vibration analysis of a hydro generator for different operating regimes

    Science.gov (United States)

    Haţiegan, C.; Pădureanu, I.; Jurcu, M.; Nedeloni, M. D.; Hamat, C. O.; Chioncel, C. P.; Trocaru, S.; Vasile, O.; Bădescu, O.; Micliuc, D.; (Filip Nedeloni, L.; Băra, A.; (Barboni Haţiegan, L.

    2017-01-01

    Based on experimental measurements, this paper presents the vibration analysis of a hydro generator that equips a Kaplan hydraulic turbine of a Hydropower plant in Romania. This analysis means vibrations measurement to different operating regimes of the hydro generator respectively before installing it and into operation, namely putting off load mode (unexcited and excited) respectively putting on load mode. By comparing, through the experimental results obtained before and after the operation of hydro aggregates are observed vibrations improvements.

  14. A comparison of metrics to evaluate the effects of hydro-facility passage stressors on fish

    Energy Technology Data Exchange (ETDEWEB)

    Colotelo, Alison H.; Goldman, Amy E.; Wagner, Katie A.; Brown, Richard S.; Deng, Z. Daniel; Richmond, Marshall C.

    2017-03-01

    Hydropower is the most common form of renewable energy, and countries worldwide are considering expanding hydropower to new areas. One of the challenges of hydropower deployment is mitigation of the environmental impacts including water quality, habitat alterations, and ecosystem connectivity. For fish species that inhabit river systems with hydropower facilities, passage through the facility to access spawning and rearing habitats can be particularly challenging. Fish moving downstream through a hydro-facility can be exposed to a number of stressors (e.g., rapid decompression, shear forces, blade strike and collision, and turbulence), which can all affect fish survival in direct and indirect ways. Many studies have investigated the effects of hydro-turbine passage on fish; however, the comparability among studies is limited by variation in the metrics and biological endpoints used. Future studies investigating the effects of hydro-turbine passage should focus on using metrics and endpoints that are easily comparable. This review summarizes four categories of metrics that are used in fisheries research and have application to hydro-turbine passage (i.e., mortality, injury, molecular metrics, behavior) and evaluates them based on several criteria (i.e., resources needed, invasiveness, comparability among stressors and species, and diagnostic properties). Additionally, these comparisons are put into context of study setting (i.e., laboratory vs. field). Overall, injury and molecular metrics are ideal for studies in which there is a need to understand the mechanisms of effect, whereas behavior and mortality metrics provide information on the whole body response of the fish. The study setting strongly influences the comparability among studies. In laboratory-based studies, stressors can be controlled by both type and magnitude, allowing for easy comparisons among studies. In contrast, field studies expose fish to realistic passage environments but the comparability is

  15. Impact of climate change on operations and planning of Hydro-Quebec's generation system

    International Nuclear Information System (INIS)

    Raymond, M.P.; Houle, B.; Robert, S.

    2008-01-01

    Studies that are underway at OURANOS indicate that some of the probable climate change scenarios in the coming years will have an effect on Quebec's watersheds hydrology and on temperatures. For Hydro-Quebec, who draws more than 95% of its generation from hydraulic resources and whose electricity loads depend pretty much on temperatures, such climate changes will definitely have a significant impact on many aspects of the planning and operations of its system. Our presentation will be divided into three parts. First, to bridge the gap between climate change scientists and water managers, we will present a list of the types of parameters needed from the scientists in order for the water managers to assess the impacts of climate changes on a hydroelectric system such as Hydro-Quebec's. These parameters will include changes in annual and seasonal distribution and variability of natural inflows and, most importantly, the timing of the changes in the coming years. The second part will focus on the types of adaptive decisions and strategies that will have to be taken ahead of time in order to implement the changes on a hydroelectric generation system such as Hydro-Quebec's. They will cover different areas such as generation planning, operations planning and optimization, refurbishment and replacement of infrastructures, dam safety, flood control and protection, maintenance planning and reliability. Finally, we will present more specific results of the impact of some climate change scenarios on Hydro-Quebec's overall generation system, showing differences between regions, and a case study on one of its river systems. (author)

  16. Competition policy and regulation in hydro-dominated electricity markets

    International Nuclear Information System (INIS)

    Rangel, Luiz Fernando

    2008-01-01

    This paper discusses the main competition issues that arise in electricity systems dominated by hydro generation, arguing that technological differences between hydro and thermal plants may allow hydropower producers to exert market power in different and subtler ways compared to thermal generators. The key for market power in hydro-based systems is the strategic allocation of a given amount of output across periods, rather than a straightforward reduction of total output. The paper examines the interaction between strategic hydro reservoir operation and transmission capacity constraints, and summarizes the implications of market power for system reliability. A review of recent relevant literature is included. Finally, possible interventions to mitigate market power are analysed

  17. Energy recovery from rivers and oceans

    International Nuclear Information System (INIS)

    2009-01-01

    This book gathers the different projects, systems and technologies allowing to recover the energy from rivers, ocean streams, waves and tides with their economic interest. Content: project of swell and waves energy recovery: Pelamis and Searev projects, buoys and breaking systems; streams and tidal energy: horizontal axis and vertical axis turbines, oscillating column and hydraulic systems; kinematic chains of energy generation systems; terrestrial hydro-energy: small-scale hydro-power, French regulation, opening of energy markets, renewable energy law, the French Pope and Lema laws, exploitation permits, markets and perspectives; small hydro-power technologies: turbines, generator, multiplier; R and D trends: turbines, engines, control systems, combined energies and uses; low-fall technology; duct-embedded systems; other technologies. (J.S.)

  18. Hydrologic design methodologies for small-scale hydro at ungauged sites. Phase 2A, British Columbia. Summary report. Integrated method for power analysis (IMP)

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Analysis of the feasibility of sites for small-scale hydroelectric power generation in British Columbia can be a difficult process in cases where gauged streamflow data are not available. This report outlines the capabilities of a package of computer programs, designed to aid the planner of small-scale hydro projects in evaluating the hydrology and energy potential of ungauged sites in that province. The programs were developed by using appropriate programming and hydrological research that had already been done, and taking advantage of experience already available from previous use of components of the package. As the province's mountainous terrain, with numerous microclimates, precluded use of methods of regional analysis based on regression or comparison with gauged streams, the package was developed on the basis of a conceptual model of physical processes on the land and in the atmosphere. The resulting package, the Integrated Method for Power Analysis, consists of five basic components: an atmospheric model of annual precipitation and one-in-ten-year 24-h maximum rainfall; a watershed model that will generate streamflow data based on information from the atmospheric model; a flood frequency analysis system that uses site-specific topographic information and information from the atmospheric model to generate a flood frequency curve; a hydroelectric power simulation program which determines the daily energy output for a run-of-river or reservoir storage site; and a graphics analysis package that provides direct visualization of atmospheric and streamflow data, and the results of watershed and power simulation modelling. 2 figs., 1 tab.

  19. Intuitive Music and Graphic Notation

    DEFF Research Database (Denmark)

    Bergstrøm-Nielsen, Carl

    Describes subjects existing at Aalborg University since the middle eighties. "Intuitive Music" trains free improvisation through exercises including group-dynamic exercises, awareness exercises and parameter exercises. Students also create open compositions. "Graphic notation"concerns aural scores....... Students' works are quoted. The writer discusses the theoretical context and advocates for giving more attention to music as the medium in which music therapy takes place, referring to language theory and Jakobson. NB: the description of the two subjects are, at the present moment (2011) no longer up...... to date. Intuitive music stresses less making compositions and more using the main instrument intuitively. Graphic notation has been integrated into a larger subject (also taught by the present author) which also comprises other methods of description and interpretation of music....

  20. Water safety near hydro generating stations: pictographic warning signs. Phase 2 of CEA No. 9110 G-31

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    There has been concern about the effectiveness of safety signage for persons using lands and waters near hydro-electric generating plants for recreational purposes. Safety signs showing animated cartoon figures were evaluated for comprehension and acceptance. Groups evaluating the effectiveness of signs included youth, English as a second language groups,, literacy-impaired, recent immigrant and native groups. Approximately ten different hazardous or potentially dangerous scenarios were presented. For most of the scenarios, at least 75 percent comprehension of signs without words was achieved. For some signs without words, comprehension levels were less satisfactory, despite improvements in graphics. Guidelines and recommendations for developing and using the signs were included in the report

  1. Learning Graphical Models With Hubs.

    Science.gov (United States)

    Tan, Kean Ming; London, Palma; Mohan, Karthik; Lee, Su-In; Fazel, Maryam; Witten, Daniela

    2014-10-01

    We consider the problem of learning a high-dimensional graphical model in which there are a few hub nodes that are densely-connected to many other nodes. Many authors have studied the use of an ℓ 1 penalty in order to learn a sparse graph in the high-dimensional setting. However, the ℓ 1 penalty implicitly assumes that each edge is equally likely and independent of all other edges. We propose a general framework to accommodate more realistic networks with hub nodes, using a convex formulation that involves a row-column overlap norm penalty. We apply this general framework to three widely-used probabilistic graphical models: the Gaussian graphical model, the covariance graph model, and the binary Ising model. An alternating direction method of multipliers algorithm is used to solve the corresponding convex optimization problems. On synthetic data, we demonstrate that our proposed framework outperforms competitors that do not explicitly model hub nodes. We illustrate our proposal on a webpage data set and a gene expression data set.

  2. Graphical Classification of Entangled Qutrits

    Directory of Open Access Journals (Sweden)

    Kentaro Honda

    2012-10-01

    Full Text Available A multipartite quantum state is entangled if it is not separable. Quantum entanglement plays a fundamental role in many applications of quantum information theory, such as quantum teleportation. Stochastic local quantum operations and classical communication (SLOCC cannot essentially change quantum entanglement without destroying it. Therefore, entanglement can be classified by dividing quantum states into equivalence classes, where two states are equivalent if each can be converted into the other by SLOCC. Properties of this classification, especially in the case of non two-dimensional quantum systems, have not been well studied. Graphical representation is sometimes used to clarify the nature and structural features of entangled states. SLOCC equivalence of quantum bits (qubits has been described graphically via a connection between tripartite entangled qubit states and commutative Frobenius algebras (CFAs in monoidal categories. In this paper, we extend this method to qutrits, i.e., systems that have three basis states. We examine the correspondence between CFAs and tripartite entangled qutrits. Using the symmetry property, which is required by the definition of a CFA, we find that there are only three equivalence classes that correspond to CFAs. We represent qutrits graphically, using the connection to CFAs. We derive equations that characterize the three equivalence classes. Moreover, we show that any qutrit can be represented as a composite of three graphs that correspond to the three classes.

  3. TEK11 graphics user's guide

    International Nuclear Information System (INIS)

    Stewart, C.R. Jr.; Joubert, W.D.; Overbey, D.R.; Stewart, K.A.

    1978-10-01

    The TEK11 graphics library was written for use on PDP-11 minicomputers running the RT-11 operating system to drive Tektronix 4010 graphics display terminals. Library subroutines are coded in FORTRAN and assembly language. The library includes routines to draw axes, either linear or semilog, to plot data in terms of logical values without first scaling to screen coordinates, to label graphs, and to plot in a maximum of four regions on the screen. Modes of plotting may be point plot with any character at the point, vector plot, or bar plot. Two features, automatic scaling and windowing, permit the researcher to use computer graphics without spending time first to learn about scaling or ''Tek points'' and preparing long parameter lists for subroutines. Regions on the screen are defined by specifying minima and maxima logical coordinates, i.e., 0 K or milliseconds, and a region number. After definition, a region may be activated for plotting by calling REGN with the region number as an argument

  4. Graphical Language for Data Processing

    Science.gov (United States)

    Alphonso, Keith

    2011-01-01

    A graphical language for processing data allows processing elements to be connected with virtual wires that represent data flows between processing modules. The processing of complex data, such as lidar data, requires many different algorithms to be applied. The purpose of this innovation is to automate the processing of complex data, such as LIDAR, without the need for complex scripting and programming languages. The system consists of a set of user-interface components that allow the user to drag and drop various algorithmic and processing components onto a process graph. By working graphically, the user can completely visualize the process flow and create complex diagrams. This innovation supports the nesting of graphs, such that a graph can be included in another graph as a single step for processing. In addition to the user interface components, the system includes a set of .NET classes that represent the graph internally. These classes provide the internal system representation of the graphical user interface. The system includes a graph execution component that reads the internal representation of the graph (as described above) and executes that graph. The execution of the graph follows the interpreted model of execution in that each node is traversed and executed from the original internal representation. In addition, there are components that allow external code elements, such as algorithms, to be easily integrated into the system, thus making the system infinitely expandable.

  5. 3D Graphics with Spreadsheets

    Directory of Open Access Journals (Sweden)

    Jan Benacka

    2009-06-01

    Full Text Available In the article, the formulas for orthographic parallel projection of 3D bodies on computer screen are derived using secondary school vector algebra. The spreadsheet implementation is demonstrated in six applications that project bodies with increasing intricacy – a convex body (cube with non-solved visibility, convex bodies (cube, chapel with solved visibility, a coloured convex body (chapel with solved visibility, and a coloured non-convex body (church with solved visibility. The projections are revolvable in horizontal and vertical plane, and they are changeable in size. The examples show an unusual way of using spreadsheets as a 3D computer graphics tool. The applications can serve as a simple introduction to the general principles of computer graphics, to the graphics with spreadsheets, and as a tool for exercising stereoscopic vision. The presented approach is usable at visualising 3D scenes within some topics of secondary school curricula as solid geometry (angles and distances of lines and planes within simple bodies or analytic geometry in space (angles and distances of lines and planes in E3, and even at university level within calculus at visualising graphs of z = f(x,y functions. Examples are pictured.

  6. Market Power in Hydro-Thermal Supply

    International Nuclear Information System (INIS)

    Edin, Karl-Axel

    2006-12-01

    Despite having had a deregulated electricity market in Sweden for over ten years we still need to increase our understanding as to how deregulated electricity markets actually work and how possible problems are to be solved. One question that is always in focus is if the competition between generators in the Nordic electricity market really works the way it was intended. Many argue that the concentration in ownership of generation plants already has gone too far. Together with joint ownership in nuclear facilities and barriers for entrance, critics say that this has resulted in higher electricity prices than necessary. In this report different methods to (ex ante) study potential possibilities for generating firms to influence the electricity price (market power) and (ex post) discover possible manipulation through analysing the spot price and other observed factors on the electricity market are analysed. The purpose of the longer underlying paper is to give a comprehensive treatment of the electricity market with storage, i.e. hydro power, with an auction market organisation and to test the models on the Nordic market in order to explore the explanatory power of auction market theory and the theory of contestable market. The main theoretical effort in the paper concerns auction theory with inventories. The paper develops an inter-temporal auction model of a thermal-hydro power market. Parallel to the derivation of the basic equations a numerical model is developed in order to illustrate the results of the model. Section 2 of the present paper summarizes the basic equations (derived in the longer paper) for an inter-temporal auction thermal-hydro market. Section 3 contains the illustrations of solutions to equations for some stylized markets. In section 4 the auction model is tested on the Nordic market

  7. Graphics-oriented application language for LASNEX

    International Nuclear Information System (INIS)

    Stringer, L.M.

    1985-01-01

    GOAL, a graphics-oriented application language, was developed to help physicists understand the large amounts of data produced by LASNEX. GOAL combines many aspects of the old LASNEX language, computer graphics, and standard computer languages

  8. The influence of annotation in graphical organizers

    NARCIS (Netherlands)

    Bezdan, Eniko; Kester, Liesbeth; Kirschner, Paul A.

    2013-01-01

    Bezdan, E., Kester, L., & Kirschner, P. A. (2012, 29-31 August). The influence of annotation in graphical organizers. Poster presented at the biannual meeting of the EARLI Special Interest Group Comprehension of Text and Graphics, Grenoble, France.

  9. Microcomputer Simulated CAD for Engineering Graphics.

    Science.gov (United States)

    Huggins, David L.; Myers, Roy E.

    1983-01-01

    Describes a simulated computer-aided-graphics (CAD) program at The Pennsylvania State University. Rationale for the program, facilities, microcomputer equipment (Apple) used, and development of a software package for simulating applied engineering graphics are considered. (JN)

  10. Computer Graphics and Administrative Decision-Making.

    Science.gov (United States)

    Yost, Michael

    1984-01-01

    Reduction in prices now makes it possible for almost any institution to use computer graphics for administrative decision making and research. Current and potential uses of computer graphics in these two areas are discussed. (JN)

  11. Computer Graphics for Multimedia and Hypermedia Development.

    Science.gov (United States)

    Mohler, James L.

    1998-01-01

    Discusses several theoretical and technical aspects of computer-graphics development that are useful for creating hypermedia and multimedia materials. Topics addressed include primary bitmap attributes in computer graphics, the jigsaw principle, and raster layering. (MSE)

  12. Standardized CSR and climate performance: why is Shell willing, but Hydro reluctant?; Shell; Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Boasson, Elin Lerum; Wettestad, Joergen

    2007-06-15

    This report aims to contribute to the ongoing discussion concerning whether CSR merely serves to streamline company rhetoric or also has an influence on actual efforts. We discuss the tangible effects of CSR instruments on the climate-related rules and performances of the two different oil companies Hydro and Shell. First we explore whether similar CSR instruments lead to similar climate-related rules and practices in the two companies. Both Hydro and Shell adhere to the Global Compact (GC), the Global Reporting Initiative (GRI), the Carbon Disclosure Project (CDP) and the Global Gas Flaring Reduction Public-Private Partnership (GGFR). The report concludes that the GC has not rendered any tangible effects in either of the companies. Concerning the other instruments, Hydro has only followed the instrument requirements that fit their initial approach, and refrained from all deviating requirements. Shell has been more malleable, but we have noted few effects on the actual emissions and business portfolio resulting from the instrument adherence. Second, we assess how the differing results of the similar CSR portfolio may be explained. The reluctant attitude of the leaders in Hydro and the strong CSR motivation of Shell's executives result in significant differences. Hydro executives are able to constrain the effects of the instrument adherence. With Shell we note the opposite pattern: Its leaders promoted the instruments to be translated into internal rules, but a general lack of hierarchical structures hinders them from governing the conduct of various sub-organisations. The very diversity of the Shell culture helps to explain why the efforts of its executives have resulted in limited impact. The strength of the Hydro culture makes the corporation resistant to the instruments. Moreover, Hydro is strikingly shielded by virtue of its strong position in Norway. In contrast, Shell is more strongly affected by the global field of petroleum and the global field of CSR

  13. Hydro-electric power - potential and limitations

    International Nuclear Information System (INIS)

    Amundsen, T.

    1995-01-01

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world's growing population, the unavoidable conclusion is that more power is to be produced. 3 figs

  14. Global warming: a changing climate for hydro

    International Nuclear Information System (INIS)

    Oud, E.

    1993-01-01

    This paper quantifies the benefits attributable to hydroelectric power generation in preventing carbon dioxide emissions from the use of thermal plants. It proposes that utilities and funding agencies consider the societal costs associated with the emission of CO 2 in power system planning. It also suggests that the industrialized countries should consider changing their funding practice and give more appropriate credits for the construction of hydro plants in developing countries, with a view to avoiding the construction and operation of fossil fuelled powerplants. (author)

  15. Main coolant pump testing at Ontario Hydro

    International Nuclear Information System (INIS)

    Hartlen, R.

    1991-01-01

    This article describes Ontario Hydro Research Division's experience with a computerized data acquisition and analysis system for monitoring mechanical vibration in reactor coolant pumps. The topics covered include bench-marking of the computer system and the coolant pumps, signatures of normal and malfunctioning pumps, analysis of data collected by the monitoring system, simulation of faults, and concerns that have been expressed about data interpretation, sensor types and locations, alarm/shutdown limits and confirmation of nondestructive examination testing. This presentation consists of overheads only

  16. Hydro-electric power - potential and limitations

    Energy Technology Data Exchange (ETDEWEB)

    Amundsen, T.

    1995-12-31

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world`s growing population, the unavoidable conclusion is that more power is to be produced. 3 figs.

  17. The Ontario Hydro mortality surveillance programme

    International Nuclear Information System (INIS)

    Anderson, T.W.

    1985-01-01

    The Ontario Hydro mortality surveillance programme was the first such study established in any group of radiation workers. Copies of annual reports are available to senior officials of both management and union and to members of the general public. Apart from an elevated Standardized Mortality Ratio in the 15.0 - 19.9 cSv range, there is no suggestion of any rising cancer death rate with increased lifetime radiation dose. It should be noted that employees who had left before pensionable age were not included in the study. Results of the study are presented in tabular form

  18. Hydro-Quebec : positioning and strategic planning

    International Nuclear Information System (INIS)

    Lanoue, R.

    1998-01-01

    Hydro-Quebec's corporate concerns for 1998-2002 were highlighted. The Corporation's strategic plan envisages that within the next decade, the utility will boost sales by 25 per cent with an investment of $13.2 billion in new generation projects. The electric utility plans to build on past experience and maintain its electricity rates and service quality. Sustaining environmental quality while developing into a world class enterprise remains a major objective of the utility. Research and development will also continue to be an integral part of the utility's operations. Tabs., figs

  19. Hydro-abrasive erosion of hydraulic turbines caused by sediment - a century of research and development

    Science.gov (United States)

    Felix, D.; Albayrak, I.; Abgottspon, A.; Boes, R. M.

    2016-11-01

    Hydro-abrasive erosion of hydraulic turbines is an economically important issue due to maintenance costs and production losses, in particular at high- and medium-head run-of- river hydropower plants (HPPs) on sediment laden rivers. In this paper, research and development in this field over the last century are reviewed. Facilities for sediment exclusion, typically sand traps, as well as turbine design and materials have been improved considerably. Since the 1980s, hard-coatings have been applied on Francis and Pelton turbine parts of erosion-prone HPPs and became state-of-the-art. These measures have led to increased times between overhauls and smaller efficiency reductions. Analytical, laboratory and field investigations have contributed to a better processes understanding and quantification of sediment-related effects on turbines. More recently, progress has been made in numerical modelling of turbine erosion. To calibrate, validate and further develop prediction models, more measurements from both physical model tests in laboratories and real-scale data from HPPs are required. Significant improvements to mitigate hydro-abrasive erosion have been achieved so far and development is ongoing. A good collaboration between turbine manufacturers, HPP operators, measuring equipment suppliers, engineering consultants, and research institutes is required. This contributes to the energy- and cost-efficient use of the worldwide hydropower potential.

  20. Retrofitting the small-scale hydro power plant 'La Chocolatiere' in Echandens-Bussigny, Switzerland

    International Nuclear Information System (INIS)

    2008-05-01

    This report for the Swiss Federal Office of Energy (SFOE) is a project study for the retrofitting of a small-scale hydro power plant installed on the River Venoge, between the communities of Echandens and Bussigny, western Switzerland. At this site, hydro power is used since the 18 th century. A permanent license to use at most 3 m 3 /s is available. The study concludes that the maximum flow rate of 6 m 3 /s would be more advantageous, implying a 35 cm higher dam on the river. Two turbines could then be installed, leading to the maximum electric power of 177 kW and the power production of 727,000 kWh/y. From the detailed inventory of the retrofitting work and the installation of the new turbines - including a new fish ladder according to the legislation in force - the authors conclude that electricity could be generated at a cost amounting to about CHF 0.24/kWh. It is recommended to request the modification of the water use license in order to be able to use up to 6 m 3 /s.

  1. Computer graphics from basic to application

    International Nuclear Information System (INIS)

    Kim, Do Hyeong; Mun, Sung Min

    1998-04-01

    This book mentions conception of computer graphics, background history, necessity and applied field like construction design, image processing, auto mobile design, fashion design and TV broadcast, basic principle of computer, computer graphics hardware, computer graphics software such as adobe illustrator tool box and adobe photo shop, quarkXpress like introduction, application and operating circumstance, 3D graphics with summary, difference of versions of 3D studio and system, and Auto CAD application.

  2. Graphic filter library implemented in CUDA language

    OpenAIRE

    Peroutková, Hedvika

    2009-01-01

    This thesis deals with the problem of reducing computation time of raster image processing by parallel computing on graphics processing unit. Raster image processing thereby refers to the application of graphic filters, which can be applied in sequence with different settings. This thesis evaluates the suitability of using parallelization on graphic card for raster image adjustments based on multicriterial choice. Filters are implemented for graphics processing unit in CUDA language. Opacity ...

  3. Computer graphics in heat-transfer simulations

    International Nuclear Information System (INIS)

    Hamlin, G.A. Jr.

    1980-01-01

    Computer graphics can be very useful in the setup of heat transfer simulations and in the display of the results of such simulations. The potential use of recently available low-cost graphics devices in the setup of such simulations has not been fully exploited. Several types of graphics devices and their potential usefulness are discussed, and some configurations of graphics equipment are presented in the low-, medium-, and high-price ranges

  4. Hierarchical data structures for graphics program languages

    International Nuclear Information System (INIS)

    Gonauser, M.; Schinner, P.; Weiss, J.

    1978-01-01

    Graphic data processing with a computer makes exacting demands on the interactive capability of the program language and the management of the graphic data. A description of the structure of a graphics program language which has been shown by initial practical experiments to possess a particularly favorable interactive capability is followed by the evaluation of various data structures (list, tree, ring) with respect to their interactive capability in processing graphics. A practical structure is proposed. (orig.) [de

  5. Computer graphics from basic to application

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Do Hyeong; Mun, Sung Min

    1998-04-15

    This book mentions conception of computer graphics, background history, necessity and applied field like construction design, image processing, auto mobile design, fashion design and TV broadcast, basic principle of computer, computer graphics hardware, computer graphics software such as adobe illustrator tool box and adobe photo shop, quarkXpress like introduction, application and operating circumstance, 3D graphics with summary, difference of versions of 3D studio and system, and Auto CAD application.

  6. Data structures, computer graphics, and pattern recognition

    CERN Document Server

    Klinger, A; Kunii, T L

    1977-01-01

    Data Structures, Computer Graphics, and Pattern Recognition focuses on the computer graphics and pattern recognition applications of data structures methodology.This book presents design related principles and research aspects of the computer graphics, system design, data management, and pattern recognition tasks. The topics include the data structure design, concise structuring of geometric data for computer aided design, and data structures for pattern recognition algorithms. The survey of data structures for computer graphics systems, application of relational data structures in computer gr

  7. Childhood trauma in the graphic memoir

    OpenAIRE

    Beskow, Sara H.

    2011-01-01

    In this thesis I examine why the graphic memoir has become such a popular platform for authors to explore their childhood, and how these authors use graphic memoirs in an attempt to understand any trauma that they experienced during their formative years. Graphic memoirs in this context allow for a dual outlet to express these complex traumatic events, both through vivid illustrations and descriptive text. To illustrate how graphic memoirs are used as an outlet for traumatic experiences I hav...

  8. Narrative Problems of Graphic Design History.

    Science.gov (United States)

    Margolin, Victor

    1994-01-01

    Discusses three major accounts (by Philip Meggs, Enric Satue and Richard Hollis) of graphic design history. Notes that these texts address the history of graphic design, but each raises questions about what material to include, as well as how graphic design is both related to and distinct from other visual practices such as typography, art…

  9. Graphical interpretation of numerical model results

    International Nuclear Information System (INIS)

    Drewes, D.R.

    1979-01-01

    Computer software has been developed to produce high quality graphical displays of data from a numerical grid model. The code uses an existing graphical display package (DISSPLA) and overcomes some of the problems of both line-printer output and traditional graphics. The software has been designed to be flexible enough to handle arbitrarily placed computation grids and a variety of display requirements

  10. Interconnected hydro-thermal systems - Models, methods, and applications

    DEFF Research Database (Denmark)

    Hindsberger, Magnus

    2003-01-01

    to be performed where the uncertainty of the inflow to the hydro reservoirs is handled endogenously. In this model snow reservoirs have been added in addition to the hydro reservoirs. Using this new approach allows sampling based decomposition algorithms to be used, which have proved to be efficient in solving...

  11. 75 FR 45607 - Application To Export Electric Energy; Manitoba Hydro

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-281-B] Application To Export Electric Energy; Manitoba Hydro AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Manitoba Hydro (Manitoba) has applied to renew its authority to transmit electric energy from the...

  12. Ontario hydro waste storage concepts and facilities

    International Nuclear Information System (INIS)

    Carter, T.J.; Mentes, G.A.

    1976-01-01

    Ontario Hydro presently operates 2,200 MWe of CANDU heavy water reactors with a further 11,000 MWe under design or construction. The annual quantities of low and medium level solid wastes expected to be produced at these stations are tabulated. In order to manage these wastes, Ontario Hydro established a Radioactive Waste Operations Site within the Bruce Nuclear Power Development located on Lake Huron about 250 km northwest of Toronto. The Waste Operations Site includes a 19-acre Storage Site plus a Radioactive Waste Volume Reduction Facility consisting of an incinerator and waste compactor. Ontario has in use or under construction both in-ground and above-ground storage facilities. In-ground facilities have been used for a number of years while the above-ground facilities are a more recent approach. Water, either in the form of precipitation, surface or subsurface water, presents the greatest concern with respect to confinement integrity and safe waste handling and storage operations

  13. B.C. Hydro drops Duke Point

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The abandonment of the proposed natural gas-fired Duke Point Power Project on Vancouver Island was discussed. It was suggested that the continuing appeal process increases the risk that the plant will not be built in time. The news followed a decision by the British Columbia (BC) Court of Appeal to hear an appeal of the project by a number of intervenors. Over $170 million has been spent on the project to date. The decision will impact the BC treasury, as the amount is being deducted from the dividends that BC Hydro would have paid to the government. A coalition of individuals and environmental groups, as well as local industry, are opposed to the plant on the basis of increased greenhouse (GHG) emissions and higher natural gas prices. The project would have required a natural gas pipeline to be built under Georgia Strait. The project was thought necessary due to the deteriorating condition of high voltage direct current cables running under the strait. BC Hydro's fallback plan for the island is load reduction. A new transmission line is also planned

  14. Hydro-Quebec and energy efficiency

    International Nuclear Information System (INIS)

    1990-01-01

    There is growing awareness that energy efficiency is both profitable and environmentally beneficial. In this year's Development Plan, Hydro-Quebec is proposing an Energy Efficiency Project made up of marketing programs designed for all markets throughout the final decade of the 20th century. This Project will have two aspects: energy efficiency and consumption management. Hydro-Quebec aims to reach an energy-efficiency level of 12.9 terawatt hours per year by 1999, fully 55% of its 23-terawatt hour potential. Over the next 10 years the utility intends to spend $1.8 billion for this purpose. Cumulative anticipated energy savings should be in the vicinity of 70 terawatt hours for the coming decade, and more than 130 terawatt hours for the first decade of the next century. Of the overall goal of 12.9 terawatt hours for Horizon 1999, energy savings of 9.0 terawatt hours should be the direct result of this year's proposed marketing programs, and will account for the bulk of anticipated investments. The remaining 3.9 terawatt hours will be gained as customers acquire better electrical appliance and accessory (household appliances, home insulation) buying habits

  15. Graphic Presentation: An Empirical Examination of the Graphic Novel Approach to Communicate Business Concepts

    Science.gov (United States)

    Short, Jeremy C.; Randolph-Seng, Brandon; McKenny, Aaron F.

    2013-01-01

    Graphic novels have been increasingly incorporated into business communication forums. Despite potential benefits, little research has examined the merits of the graphic novel approach. In response, we engage in a two-study approach. Study 1 explores the potential of graphic novels to affect learning outcomes and finds that the graphic novel was…

  16. Measuring Cognitive Load in Test Items: Static Graphics versus Animated Graphics

    Science.gov (United States)

    Dindar, M.; Kabakçi Yurdakul, I.; Inan Dönmez, F.

    2015-01-01

    The majority of multimedia learning studies focus on the use of graphics in learning process but very few of them examine the role of graphics in testing students' knowledge. This study investigates the use of static graphics versus animated graphics in a computer-based English achievement test from a cognitive load theory perspective. Three…

  17. The 'Lehn' small hydro-power station; KWKW Lehn Vorprojekt - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Ruff, H.; Widmer, P.

    2009-02-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) takes a look at the refurbishment of a small hydro-power station in the UNESCO biosphere region in the Entlebuch, Switzerland. The five grounds for the refurbishment are examined - repair of the water intake, flood protection, regulation of residual water, reduction of floating debris and sand and optimisation of the system by using automatic control. Figures on the cost of the refurbishment and electricity production are presented and discussed, as is the economic viability of the project. The existing installations are described and the hydrology of the stream is discussed, as are legal requirements and technical basics. Variants for the refurbishment are examined and operational aspects are looked at. A comprehensive appendix provides details on the proposal in graphical and tabular form.

  18. A new PID controller design for automatic generation control of hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Khodabakhshian, A.; Hooshmand, R. [Electrical Engineering Department, University of Isfahan (Iran)

    2010-06-15

    This paper presents a new robust PID controller for automatic generation control (AGC) of hydro turbine power systems. The method is mainly based on a maximum peak resonance specification that is graphically supported by the Nichols chart. The open-loop frequency response curve is tangent to a specified ellipse and this makes the method to be efficient for controlling the overshoot, the stability and the dynamics of the system. Comparative results of this new load frequency controller with a conventional PI one and also with another PID controller design tested on a multimachine power system show the improvement in system damping remarkably. The region of acceptable performance of the new PID controller covers a wide range of operating and system conditions. (author)

  19. A handbook of statistical graphics using SAS ODS

    CERN Document Server

    Der, Geoff

    2014-01-01

    An Introduction to Graphics: Good Graphics, Bad Graphics, Catastrophic Graphics and Statistical GraphicsThe Challenger DisasterGraphical DisplaysA Little History and Some Early Graphical DisplaysGraphical DeceptionAn Introduction to ODS GraphicsGenerating ODS GraphsODS DestinationsStatistical Graphics ProceduresODS Graphs from Statistical ProceduresControlling ODS GraphicsControlling Labelling in GraphsODS Graphics EditorGraphs for Displaying the Characteristics of Univariate Data: Horse Racing, Mortality Rates, Forearm Lengths, Survival Times and Geyser EruptionsIntroductionPie Chart, Bar Cha

  20. Wound bed preparation: A novel approach using HydroTherapy.

    Science.gov (United States)

    Atkin, Leanne; Ousey, Karen

    2016-12-01

    Wounds that fail to heal quickly are often encountered by community nursing staff. An important step in assisting these chronic or stalled wounds progress through healing is debridement to remove devitalised tissue, including slough and eschar, that can prevent the wound from healing. A unique wound treatment called HydroTherapy aims to provide an optimal healing environment. The first step of HydroTherapy involves HydroClean plus™, this dressing enables removal of devitalised tissue through autolytic debridement and absorption of wound fluid. Irrigation and cleansing provided by Ringer's solution from the dressing further removes any necrotic tissue or eschar. Once effective wound bed preparation has been achieved a second dressing, HydroTac™, provides an ongoing hydrated wound environment that enables re-epithelialisation to occur in an unrestricted fashion. This paper presents 3 case studies of slow healing wounds treated with HydroClean plus™ which demonstrates effective wound debridement.

  1. Some Thoughts on Contemporary Graphic Print

    Directory of Open Access Journals (Sweden)

    Stefan Skiba

    2016-09-01

    Full Text Available The production requirements of original graphic works of art have changed since 1980. The development of digital printing using lightfast colors now rivals traditional techniques such as wood cut, screen print, lithography, etching etc. Today, with respect to artistic legitimacy, original graphics using traditional printing techniques compete with original graphics produced by digital printing techniques on the art market. What criteria distinguish traditional printing techniques from those of digital printing in the production and acquisition of original graphics? What consequences is the serious artist faced with when deciding to implement digital print production? How does digital print change original graphic acquisition decisions?

  2. Graphical debugging of combinational geometry

    International Nuclear Information System (INIS)

    Burns, T.J.; Smith, M.S.

    1992-01-01

    A graphical debugger for combinatorial geometry being developed at Oak Ridge National Laboratory is described. The prototype debugger consists of two parts: a FORTRAN-based ''view'' generator and a Microsoft Windows application for displaying the geometry. Options and features of both modules are discussed. Examples illustrating the various options available are presented. The potential for utilizing the images produced using the debugger as a visualization tool for the output of the radiation transport codes is discussed as is the future direction of the development

  3. HISPLT: A history graphics postprocessor

    International Nuclear Information System (INIS)

    Thompson, S.L.; Kmetyk, L.N.

    1991-09-01

    HISPLT is a graphics postprocessor designed to plot time histories for wave propagation codes. HISPLT is available for CRAY UNICOS, CRAY CTSS, VAX VMS computer systems, and a variety of UNIX workstations. The original HISPLT code employs a database structure that allows the program to be used without modification to process data generated by many wave propagation codes. HISPLT has recently been modified to process time histories for the reactor safety analysis code, MELCOR. This report provides a complete set of input instructions for HISPLT and provides examples of the types of plotted output that can be generated using HISPLT. 6 refs., 8 figs., 5 tabs

  4. Wang Tiles in Computer Graphics

    CERN Document Server

    Lagae, Ares

    2009-01-01

    Many complex signals in computer graphics, such as point distributions and textures, cannot be efficiently synthesized and stored. This book presents tile-based methods based on Wang tiles and corner tiles to solve both these problems. Instead of synthesizing a complex signal when needed, the signal is synthesized beforehand over a small set of Wang tiles or corner tiles. Arbitrary large amounts of that signal can then efficiently be generated when needed by generating a stochastic tiling, and storing only a small set of tiles reduces storage requirements. A tile-based method for generating a

  5. Graphical presentation of participants' results

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The results obtained by 19 participating dosimetry systems are presented in this section. Section 3 of the preceding report, ''Evaluation of the Results of the First IAEA Coordinated Research Program on Intercomparison for Individual Monitoring'', explains the format and conventions used for the graphical presentation. The system number appearing in the upper left hand corner of each page can be used to correlate the dosimeter design information found in Table 2 of the preceding report with the results. However, care should be used in drawing inferences from this correlation, since system performance depends on a number of factors other than detector selection and design characteristics. (orig.)

  6. Graphics workflow optimization when editing standard tasks using modern graphics editing programs

    OpenAIRE

    Khabirova, Maja

    2012-01-01

    This work focuses on the description and characteristics of common problems which graphic designers face daily when working for advertising agencies. This work describes tasks and organises them according to the type of graphic being processed and the types of output. In addition, this work describes the ways these common tasks can be completed using modern graphics editing software. It also provides a practical definition of a graphic designer and graphic agency. The aim of this work is to m...

  7. The Meielsgrund and Turbach small hydro power stations in Saanen, Switzerland; PCH du Meielsgrund et PCH de Turbach - Rapports finaux

    Energy Technology Data Exchange (ETDEWEB)

    Cavin, G. [Stucky SA, Renens (Switzerland); Wagner, T. [Sigmaplan, Berne (Switzerland)

    2009-12-15

    These four final illustrated reports for the Swiss Federal Office of Energy (SFOE) deal with various aspects of two small hydro projects on two affluents of the river Saane in Switzerland. The first report presents two variants for the enhancement of the existing Meielsgrund installation as well as a new, parallel installation. The catchment area involved, available head, residual water quantities, installed power and annual production figures are discussed. Investments, operating costs and financial viability are also looked at. The second report describes the project and discusses regional planning aspects, hydrological basics and environmental issues in connection with the renewal project, including details on invertebrates found in the stream and their relevance to fishing and nature protection issues. The third and fourth reports concern the Turbach small hydro installation. The topics discussed in these two reports are basically similar to those considered for the Meielsgrund installation.

  8. Global relationships in river hydromorphology

    Science.gov (United States)

    Pavelsky, T.; Lion, C.; Allen, G. H.; Durand, M. T.; Schumann, G.; Beighley, E.; Yang, X.

    2017-12-01

    Since the widespread adoption of digital elevation models (DEMs) in the 1980s, most global and continental-scale analysis of river flow characteristics has been focused on measurements derived from DEMs such as drainage area, elevation, and slope. These variables (especially drainage area) have been related to other quantities of interest such as river width, depth, and velocity via empirical relationships that often take the form of power laws. More recently, a number of groups have developed more direct measurements of river location and some aspects of planform geometry from optical satellite imagery on regional, continental, and global scales. However, these satellite-derived datasets often lack many of the qualities that make DEM=derived datasets attractive, including robust network topology. Here, we present analysis of a dataset that combines the Global River Widths from Landsat (GRWL) database of river location, width, and braiding index with a river database extracted from the Shuttle Radar Topography Mission DEM and the HydroSHEDS dataset. Using these combined tools, we present a dataset that includes measurements of river width, slope, braiding index, upstream drainage area, and other variables. The dataset is available everywhere that both datasets are available, which includes all continental areas south of 60N with rivers sufficiently large to be observed with Landsat imagery. We use the dataset to examine patterns and frequencies of river form across continental and global scales as well as global relationships among variables including width, slope, and drainage area. The results demonstrate the complex relationships among different dimensions of river hydromorphology at the global scale.

  9. Identification of computer graphics objects

    Directory of Open Access Journals (Sweden)

    Rossinskyi Yu.M.

    2016-04-01

    Full Text Available The article is devoted to the use of computer graphics methods in problems of creating drawings, charts, drafting, etc. The widespread use of these methods requires the development of efficient algorithms for the identification of objects of drawings. The article analyzes the model-making algorithms for this problem and considered the possibility of reducing the time using graphics editing operations. Editing results in such operations as copying, moving and deleting objects specified images. These operations allow the use of a reliable identification of images of objects methods. For information on the composition of the image of the object along with information about the identity and the color should include information about the spatial location and other characteristics of the object (the thickness and style of contour lines, fill style, and so on. In order to enable the pixel image analysis to structure the information it is necessary to enable the initial code image objects color. The article shows the results of the implementation of the algorithm of encoding object identifiers. To simplify the process of building drawings of any kind, and reduce time-consuming, method of drawing objects identification is proposed based on the use as the ID information of the object color.

  10. Intercomparison of Streamflow Simulations between WRF-Hydro and Hydrology Laboratory-Research Distributed Hydrologic Model Frameworks

    Science.gov (United States)

    KIM, J.; Smith, M. B.; Koren, V.; Salas, F.; Cui, Z.; Johnson, D.

    2017-12-01

    The National Oceanic and Atmospheric Administration (NOAA)-National Weather Service (NWS) developed the Hydrology Laboratory-Research Distributed Hydrologic Model (HL-RDHM) framework as an initial step towards spatially distributed modeling at River Forecast Centers (RFCs). Recently, the NOAA/NWS worked with the National Center for Atmospheric Research (NCAR) to implement the National Water Model (NWM) for nationally-consistent water resources prediction. The NWM is based on the WRF-Hydro framework and is run at a 1km spatial resolution and 1-hour time step over the contiguous United States (CONUS) and contributing areas in Canada and Mexico. In this study, we compare streamflow simulations from HL-RDHM and WRF-Hydro to observations from 279 USGS stations. For streamflow simulations, HL-RDHM is run on 4km grids with the temporal resolution of 1 hour for a 5-year period (Water Years 2008-2012), using a priori parameters provided by NOAA-NWS. The WRF-Hydro streamflow simulations for the same time period are extracted from NCAR's 23 retrospective run of the NWM (version 1.0) over CONUS based on 1km grids. We choose 279 USGS stations which are relatively less affected by dams or reservoirs, in the domains of six different RFCs. We use the daily average values of simulations and observations for the convenience of comparison. The main purpose of this research is to evaluate how HL-RDHM and WRF-Hydro perform at USGS gauge stations. We compare daily time-series of observations and both simulations, and calculate the error values using a variety of error functions. Using these plots and error values, we evaluate the performances of HL-RDHM and WRF-Hydro models. Our results show a mix of model performance across geographic regions.

  11. Stable isotope characteristics of precipitation of Pamba River basin ...

    Indian Academy of Sciences (India)

    highly essential input function for isotope hydro- ... Wind speed in the Pamba River basin varies from 8.5 to. 13.6 km/hr (NWDA 2008). ... ets of low values in the hill stations of the Ghats ... reservoir for the hydroelectric power production in.

  12. Hydroelectric power utilization of the River Crna Reka

    International Nuclear Information System (INIS)

    Ivanova-Davidovikj, Jasna

    2001-01-01

    In the paper several feasibility studies for rational use of the Macedonian River Crna Reka, developed by foreign companies are analysed. The utilization of the hydro-power potential of the River Crna Reka is predicted to be by realization of two hydroelectric power plants with total capacity of 450 MW, as well as annual electric power generation of 600 GWh. This two HPPs will facilitate the development of the Macedonian electric power system

  13. Main tributary influence on the River Vardar water quantity

    International Nuclear Information System (INIS)

    Unevska, Blaga; Stojov, Vasko; Milevski, Josif

    2004-01-01

    Hydrology in all catchments is defined like complex of geophysics and hydro-geologic parameters. Regular defining on the hydrological parameters is essential for planning, improving and developing management on every country. The main aim of this topic is to demonstrate disparity disposal on water resources in Republic of Macedonia depending on the different catchments areas. Here will be talk about different percentage of tributaries, which have influence on river Vardar. River Vardar is main recipient on water in Macedonia.(Author)

  14. Sinkhole investigated at B.C. Hydro`s Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1996-07-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro`s W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig.

  15. Architecture at Hydro-Quebec. L'architecture a Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  16. Development and applications of reactor noise analysis at Ontario Hydro`s CANDU reactors

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckler, O [Ontario Hydro, Toronto, ON (Canada); Tulett, M V [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1996-12-31

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro`s CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  17. Penstock failure detection system at the 'Valsan' hydro power plant

    International Nuclear Information System (INIS)

    Georgescu, A M; Coşoiu, C I; Alboiu, N; Hlevca, D; Tataroiu, R; Popescu, O

    2012-01-01

    'Valsan' is a small Hydro Power Plant, 5 MW, situated at about 160 km north of Bucharest, Romania, on the small 'Valsan' river in a remote mountainous area. It is equipped with a single Francis turbine. The penstock is located in the access shaft of the HPP. 'Hidroelectrica', the Romanian company that operates the HPP, was trying to implement a remote penstock failure detection system. Starting from a classic hydraulic problem, the authors of the paper derived a method for failure detection and localization on the pipe. The method assumes the existence of 2 flow meters and 2 pressure transducers at the inlet and outlet of the pressurized pipe. Calculations have to be based on experimental values measured in a permanent regime for different values of the flow rate. The method was at first tested on a pipe, in the Hydraulic Laboratory of the Technical University of Civil Engineering Bucharest. Pipe failure was modelled by opening of a valve on a tee branch of the analyzed pipe. Experimental results were found to be in good agreement with theoretical ones. The penstock of the 'Valsan' HPP, was modelled in EPANET, in order to: i) test the method at a larger scale; ii) get the right flow and pressure transducers that are needed to implement it. At the request of 'Hidroelectrica' a routine that computes the efficiency of the turbine was added to the monitoring software. After the system was implemented, another series of measurements were performed at the site in order to validate it. Failure was modelled by opening an existing valve on a branch of the penstock. Detection of the failure was correct and almost instantaneous, while failure location was accurate within 5% of the total penstock length.

  18. Penstock failure detection system at the "Valsan" hydro power plant

    Science.gov (United States)

    Georgescu, A. M.; Coşoiu, C. I.; Alboiu, N.; Hlevca, D.; Tataroiu, R.; Popescu, O.

    2012-11-01

    "Valsan" is a small Hydro Power Plant, 5 MW, situated at about 160 km north of Bucharest, Romania, on the small "Valsan" river in a remote mountainous area. It is equipped with a single Francis turbine. The penstock is located in the access shaft of the HPP. "Hidroelectrica", the Romanian company that operates the HPP, was trying to implement a remote penstock failure detection system. Starting from a classic hydraulic problem, the authors of the paper derived a method for failure detection and localization on the pipe. The method assumes the existence of 2 flow meters and 2 pressure transducers at the inlet and outlet of the pressurized pipe. Calculations have to be based on experimental values measured in a permanent regime for different values of the flow rate. The method was at first tested on a pipe, in the Hydraulic Laboratory of the Technical University of Civil Engineering Bucharest. Pipe failure was modelled by opening of a valve on a tee branch of the analyzed pipe. Experimental results were found to be in good agreement with theoretical ones. The penstock of the "Valsan" HPP, was modelled in EPANET, in order to: i) test the method at a larger scale; ii) get the right flow and pressure transducers that are needed to implement it. At the request of "Hidroelectrica" a routine that computes the efficiency of the turbine was added to the monitoring software. After the system was implemented, another series of measurements were performed at the site in order to validate it. Failure was modelled by opening an existing valve on a branch of the penstock. Detection of the failure was correct and almost instantaneous, while failure location was accurate within 5% of the total penstock length.

  19. Graphical programming at Sandia National Laboratories

    International Nuclear Information System (INIS)

    McDonald, M.J.; Palmquist, R.D.; Desjarlais, L.

    1993-09-01

    Sandia has developed an advanced operational control system approach, called Graphical Programming, to design, program, and operate robotic systems. The Graphical Programming approach produces robot systems that are faster to develop and use, safer in operation, and cheaper overall than altemative teleoperation or autonomous robot control systems. Graphical Programming also provides an efficient and easy-to-use interface to traditional robot systems for use in setup and programming tasks. This paper provides an overview of the Graphical Programming approach and lists key features of Graphical Programming systems. Graphical Programming uses 3-D visualization and simulation software with intuitive operator interfaces for the programming and control of complex robotic systems. Graphical Programming Supervisor software modules allow an operator to command and simulate complex tasks in a graphic preview mode and, when acceptable, command the actual robots and monitor their motions with the graphic system. Graphical Programming Supervisors maintain registration with the real world and allow the robot to perform tasks that cannot be accurately represented with models alone by using a combination of model and sensor-based control

  20. High-resolution hydro- and geo-stratigraphy at Atlantic Coastal Plain drillhole CR-622 (Strat 8)

    Science.gov (United States)

    Wrege, B.M.; Isely, J.J.

    2009-01-01

    We interpret borehole geophysical logs in conjunction with lithology developed from continuous core to produce high-resolution hydro- and geo-stratigraphic profiles for the drillhole CR-622 (Strat 8) in the Atlantic Coastal Plain of North Carolina. The resulting hydrologic and stratigraphic columns show a generalized relation between hydrologic and geologic units. Fresh-water aquifers encountered are the surficial, Yorktown, Pungo River and Castle Hayne. Geologic units present are of the middle and upper Tertiary and Quaternary periods, these are the Castle Hayne (Eocene), Pungo River (Miocene), Yorktown (Pliocene), James City and Flanner Beach (Pleistocene), and the topsoil (Holocene). The River Bend Formation (Oligocene) is missing as a distinct unit between the Pungo River Formation and the Castle Hayne Formation. The confining unit underlying the Yorktown Aquifer corresponds to the Yorktown Geologic Unit. The remaining hydrologic units and geologic units are hydrologically transitional and non-coincident. The lower Pungo River Formation serves as the confining unit for the Castle Hayne Aquifer, rather than the River Bend Aquifer, and separates the Pungo River Aquifer from the upper Castle Hayne Aquifer. All geologic formations were bound by unconformities. All aquifers were confined by the anticipated hydrologic units. We conclude that CR-622 (Strat 8) represents a normal sequence in the Atlantic Coastal Plain.

  1. The dual hydro x nuclear power plants

    International Nuclear Information System (INIS)

    Borges, J.C.

    1984-01-01

    An our daily life in modern society becomes more and more dependent on electricity, supply of this kind of energy should not only be a part of a global energy policy, but also lay down rigorous criteria to garanty the market supply. Planning actions of the electrical sector are more sensitive to unforseen events, either to brief interruptions in energy supply or to non-equilibrium at any time of the excess of supply over demand. In this way, the cost factor although basic, does not lead to optimal solutions in decisions which involve options between different technologies and energy sources to generate electricity. In this paper, we analyse the above situation in the case of deciding between utilization of nuclear or hydro power plants to supply the Brazilian demande for electricity. Our final objective was the search for parameters which could lead us to better identify and understand the adroitness and mistakes of the Brazilian Nuclear Program. (Author) [pt

  2. Ontario Hydro nuclear - challenges of the future

    International Nuclear Information System (INIS)

    Field, R.

    1996-01-01

    The challenges facing Ontario Hydro Nuclear (OHN), as understood at the time of the conference, are discussed. OHN had many strengths to build on in preparing for the competition ahead, including: extremely competitive production costs, strong technical capabilities, advantages of multiple units, environmental advantages favoring nuclear, strong public support, and improving station performance. Even with these advantages, OHN faced the difficult challenge of improving overall performance in the face of a large debt burden, coupled with the reinvestment demands of aging units at Pickering A and Bruce A. At the time of the conference, Bruce 2 had already been shut down, because the cost of retubing it and replacing its boilers could not be justified. The ''drive to nuclear excellence'' involves the simultaneous achievement of top performance in safety, reliability and cost; and to this end, changes were being made to reverse the trends indicated by disappointing ''peer reviews''

  3. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  4. The Manitoba Hydro-Electric Board 50. annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs.

  5. The Manitoba Hydro-Electric Board 50. annual report

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs

  6. Experience of pico/micro hydro based power generation

    Energy Technology Data Exchange (ETDEWEB)

    Murthy, S.S. [Indian Inst. of Technology, Delhi, New Delhi (India). Dept. of Electrical Engineering

    2010-07-01

    Although India has approximately 150,000 megawatts of hydro potential, only a small portion is tapped. There is also significant untapped hydro potential in many developing countries such as Nepal, Bhutan, Vietnam, Indonesia and regions in South America and Africa. Small-scale hydroelectric power systems with capacities of up to a few megawatts are eco-friendly and sustainable. They can be classified based on unit sizes as pico (u pto 10 kilowatts), micro (10-100 kilowatts) and mini (100 kilowatts to a few megawatts) hydro systems. Mini hydro systems are always grid connected while micro can be either grid connected or off grid. Pico is always off grid. In India, there are thousands of favorable sites in this range that should be tapped for distributed power generation to electrify local communities. This need is reflected by the global emphasis on distributed power generation as well as the Government of India's policy to promote this type of power generation. A working stand alone pico-hydro power generating system has been successfully installed in 5 sites in Karnataka. The purpose of the project was to demonstrate the technical, managerial and economic feasibility of setting up small hydro projects in remote hilly areas of Karnataka, India and its positive environmental impact. The presentation discussed the site selection criteria; installed sites of pico hydro; system description; parts of the system; the electric load controller; types of electronic load controllers; and a description of the unit and control scheme. tabs., figs.

  7. Innovative private micro-hydro power development in Rwanda

    International Nuclear Information System (INIS)

    Pigaht, Maurice; Plas, Robert J. van der

    2009-01-01

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (i) institutional arrangements rather than technical quality determine the success of such projects; (ii) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (iii) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too.

  8. Innovative private micro-hydro power development in Rwanda

    Energy Technology Data Exchange (ETDEWEB)

    Pigaht, Maurice; Van der Plas, Robert J. [MARGE-Netherlands, Brem 68, 7577 EW Oldenzaal (Netherlands)

    2009-11-15

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (1) institutional arrangements rather than technical quality determine the success of such projects; (2) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (3) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too. (author)

  9. Hydro-Quebec annual report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    An overview is presented of the activities of Hydro-Quebec for the year ended December 31, 1993, as well as its financial status. Export sales of electricity to other Canadian provinces and the USA are reported. Research programs and demonstration projects are described, as well as the utility's international activities. Environmental and economic considerations for the province are presented. Financial data includes total sales, sales by sector, export sales, and rate changes. A financial statement is included. In 1993, total sales volume was 152.1 TWh, or 7.5 TWh more than in 1992, for a total sales revenue of $7,004 million, an increase of 3.5% over 1992. Sales in Quebec increased 5 TWh, with nearly all of this increase coming from the industrial sector. Exports outside of Quebec totalled 15 TWh, or 20% more than in 1992. The largest increase in exports was in the form of short-term sales to the USA. Expenditures in 1993 were $3,761 million, only slightly more than in 1992. Facilities commissioned in 1993 included the Brisay power plant, two of six units at the Laforge-1 plant, and the north portion of the 12th transmission line from the LaGrande complex. Total installed capacity of the Hydro-Quebec system reached 29,131 MW, and total power produced was 131.6 TWh. Total length of transmission and distribution lines in 1993 reached 29,869 km and 100,908 km respectively. 9 figs., 17 tabs

  10. Hydro-Quebec 2005 annual report : people with energy

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec generates, transmits and distributes electricity mainly produced by renewable energy sources. Its sole shareholder is the Quebec government. This annual report reviewed the operations of Hydro-Quebec, and provided data on energy sales, production and details of the utility's environmental programs. Information on Hydro-Quebec subsidiaries in 2005 was presented in the following separate sections: Hydro-Quebec Production; Hydro-Quebec TransEnergie; Hydro-Quebec Distribution; Hydro-Quebec Equipement; and the Societe d'energie de la Baie James. In 2005, Hydro-Quebec Distribution signed contracts for an initial block of 990 MW of wind power and issued a tender call for an additional 2000 MW of wind power. A generator balancing service was created and authorized by the Regie de l'energie. Hydro-Quebec customers have achieved energy savings of nearly 450 GWh in 2005. The commissioning of Toulnustouc generating station was achieved 5 months ahead of schedule. The 526 MW facility will generate 2.7 TWh annually. Work at the Chute-Allard and Rapide-des-Coeurs sites has continued, as well as construction at Mercier and Peribonka and Eastmain-1. Income from continuing operations came to $2.25 billion, a $124 million increase that was attributed to a rise in domestic sales and net short-term exports. The income was offset by higher pension expenses, depreciation and amortization, as well as by cost of supply on external markets and financial expenses. All other operating expenses were lower than in 2004. Capital spending for the transmission system reached its highest level since 1997, with $793 million invested, including $336 million to meet growth. Data on the company's financial performance, executive changes and reorganization were provided. Financial statements included a review and analysis of financial transactions, an auditor's report, as well as customary notes to the consolidated financial statement including balance sheets, assets, liabilities and

  11. Graphic correlation of the Frasnian Upper Devonian Composite

    Energy Technology Data Exchange (ETDEWEB)

    Klapper, G. (Univ. of Iowa, Iowa City, IA (United States). Dept. of Geology); Kirchgasser, W.T. (Potsdam Coll., NY (United States). Geology Dept.); Baesemann, J.F. (Amoco Production Co., Houston, TX (United States))

    1993-03-01

    Although statistical solution to the line of correlation (LOC) was advocated by Shaw (1964) when the technique of graphic correlation was introduced, most practioners, including Shaw himself shortly after publication of Time in Stratigraphy, agree that statistical methods for locating the LOC are inappropriate. As a consequence, calculation of the standard error of estimate and other statistical measures of error in order to quantify the resolution of graphic correlation is also inappropriate. Methods for locating the LOC are diverse involving geologic as well as biostratigraphic knowledge, and include positioning it with respect to magnetic reversals, volcanic ash beds, oxygen isotope data, and splitting bases and tops of species so as to cause minimum disruption in known ranges. The LOC for each section with the Composite Standard is a testable hypothesis of stratigraphic correlation. The Frasnian Composite consists of 27 sections in the Montagne Noire (southern France), Alberta Rockies, Hay River - Trout River areas of the Northwest Territories, Canada, the Midcontinent and New York sequences in the US, the Canning Basin, Western Australia, and the Central Devonian Field and Timan-Pechora Basin of the Russian Platform. Through graphic correlation, the Frasnian Stage is divided into 34 composite standard units, using ranges of conodonts and to a lesser extent goniatites. The resulting subdivision is considerably more precise than that achieved by the conventional thirteen-fold zonation based on the Montagne Noire conodont sequence, many zones of which have been replicated in the cited areas outside the Montagne Noire. The Frasnian Composite successfully provides a precise intrazonal method of correlation that uses the ranges of all species from the studies sections in a single biostratigraphic framework, rather than emphasizing a few zonal indices.

  12. Spectra processing with computer graphics

    International Nuclear Information System (INIS)

    Kruse, H.

    1979-01-01

    A program of processng gamma-ray spectra in rock analysis is described. The peak search was performed by applying a cross-correlation function. The experimental data were approximated by an analytical function represented by the sum of a polynomial and a multiple peak function. The latter is Gaussian, joined with the low-energy side by an exponential. A modified Gauss-Newton algorithm is applied for the purpose of fitting the data to the function. The processing of the values derived from a lunar sample demonstrates the effect of different choices of polynomial orders for approximating the background for various fitting intervals. Observations on applications of interactive graphics are presented. 3 figures, 1 table

  13. The HEASARC graphical user interface

    Science.gov (United States)

    White, N.; Barrett, P.; Jacobs, P.; Oneel, B.

    1992-01-01

    An OSF/Motif-based graphical user interface has been developed to facilitate the use of the database and data analysis software packages available from the High Energy Astrophysics Science Archive Research Center (HEASARC). It can also be used as an interface to other, similar, routines. A small number of tables are constructed to specify the possible commands and command parameters for a given set of analysis routines. These tables can be modified by a designer to affect the appearance of the interface screens. They can also be dynamically changed in response to parameter adjustments made while the underlying program is running. Additionally, a communication protocol has been designed so that the interface can operate locally or across a network. It is intended that this software be able to run on a variety of workstations and X terminals.

  14. Fish habitat considerations associated with hydro-electric developments in Quebec region

    International Nuclear Information System (INIS)

    Bain, H.; Stoneman, M.

    2005-01-01

    Alternative approaches for evaluating the effects of 2 large Hydro Quebec proposed facilities on fish habitats were presented. The proposed projects will convert long stretches of river into water reservoirs and reduce the flow in the rivers below the impoundments for parts of the year. Rivers will be transformed into water reservoirs upstream by the dams, and a moderately large river will be transformed downstream into a much smaller river with a regulated flow. Productive capacity of fish populations is difficult to measure in large water bodies, and complications in the evaluation process have posed problems in the application of a traditional no-net-loss policy. It was suggested that estimates of biomass and productivity should be obtained from established methods of electrofishing combined with maps of the river and stream characteristics. For lakes and reservoirs, biomass and production will be estimated from models using a morphoedaphic index and measures of lake reservoir areas. Productivity will be partitioned among species according to surveys of existing lakes and reservoirs. It was also proposed that mitigation and compensation should be considered on a case-by-case basis related to importance of impact on fish production; geographic range of the impacts; regional fisheries management objectives for commercial, recreational, and subsistence fisheries and biodiversity conservation. Special attention will be given to listed species such as Atlantic salmon and lake sturgeon. Additional field sampling was recommended in areas impacted by the developments. Concerns about the technical methods used in sampling and monitoring data were reviewed, as well as issues concerning protected and unprotected species. It was suggested that predictive models of fish population characteristics will need to be parameterized for temperature ranges associated with the projects. It was noted that habitat suitability index methods do not consider the ecological flexibility

  15. CONSIDERATIONS ABOUT APPLICATION OF GRAPHICAL CALCULUS

    Directory of Open Access Journals (Sweden)

    Anghel Alina Angelica

    2015-06-01

    Full Text Available Some typical engineering problems can be solved using graphical methods in an integrated way for knowledge of design, mathematics, mechanics and physics. This paper presents some graphical methods which improve student’s performances on streigth of intuitive interpretation, visualization and understanding solutions of engineering problems. The increased use of graphical methods adds another layer of interpretation to a given task requiring the coordination of different knowledge, in order to produce a correct solution and to improve the product design.

  16. Programming Language Software For Graphics Applications

    Science.gov (United States)

    Beckman, Brian C.

    1993-01-01

    New approach reduces repetitive development of features common to different applications. High-level programming language and interactive environment with access to graphical hardware and software created by adding graphical commands and other constructs to standardized, general-purpose programming language, "Scheme". Designed for use in developing other software incorporating interactive computer-graphics capabilities into application programs. Provides alternative to programming entire applications in C or FORTRAN, specifically ameliorating design and implementation of complex control and data structures typifying applications with interactive graphics. Enables experimental programming and rapid development of prototype software, and yields high-level programs serving as executable versions of software-design documentation.

  17. Geometrical and Graphical Solutions of Quadratic Equations.

    Science.gov (United States)

    Hornsby, E. John, Jr.

    1990-01-01

    Presented are several geometrical and graphical methods of solving quadratic equations. Discussed are Greek origins, Carlyle's method, von Staudt's method, fixed graph methods and imaginary solutions. (CW)

  18. From centralized hydro-thermal to decentralized renewable : the Austrian challenge

    International Nuclear Information System (INIS)

    Brauner, G.

    2007-01-01

    Austria's electricity production scheme is currently based on 67 per cent hydro power, 25 per cent fossil thermal power and 8 per cent new renewable energy, including wind, biomass, and photovoltaic conversion. As demand on centralized energy systems increases, the power generation, transmission and distribution system in the country will have to be restructured to increase the portion of regenerative generation. Decentralized micro-grid structures are a promising concept for meeting the target of efficiency improvement and renewable generation because they make it possible to use regenerative energy where it is collected. The most efficient way to meet the challenges of efficiency improvement and emission reduction is the replacement of old coal-fired power stations by new combined-cycle gas power stations with combined heat and power. This will reduce both carbon dioxide emissions as well as specific fossil energy demand. However, in just 1 decade the emission reduction achieved by fuel switching and higher efficiency of power stations will be equalized by higher demand, which is growing at an annual rate of 2 per cent. Future energy problems will be characterized by the security of supply; climatic change and the need for clean energy technologies; the lack of transmission-routes; and growing energy demand. The regenerative energy in Austria currently consists of hydraulic large run-of-river hydraulic generation as well as small scale hydro and large scale hydro storage systems. Biomass currently has a total generating capacity of 280 MW and forms 3.14 per cent of generation in Austria. Wind has reached a capacity of 950 MW and forms 3.8 per cent of generation in Austria. It was concluded that the future philosophy in energy supply will not be to try to increase regenerative generation according to growing demand, but to improve end-use efficiency and reduce demand according to the renewable regional potential. 4 refs., 4 figs

  19. Times are changing, Hydro-Quebec multiplies its assets

    International Nuclear Information System (INIS)

    Lefevre, M.

    1997-01-01

    Hydro-Quebec''s advance into the North American and world multi-energy market began with the purchase of an interest in the natural gas holding company Noverco, a commercial partnership with Gaz de France, and marketing agreements with Enron and Trigen in the United States. Hydro-Quebec, the world''s sixth largest electric utility, aims to become a multi-energy enterprise selling not only electricity, but also natural gas, oil and certain renewable forms of energy. Currently, Hydro-Quebec is licensed to make border sales of electricity at regulated prices. Through the US Federal Energy Regulatory Commission (FERC), Hydro-Quebec will be able also to sell electricity through wholesale spot contracts with electricity marketers such as Trigen and Enron

  20. Fouling in small hydro projects; Verschmutzung von Kleinwasserkraftwerken - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Abgottspon, A.; Staubli, T.

    2010-03-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) takes a look at fouling problems encountered in small hydro installations. The report is based on ten interviews made with operators of small hydro power stations in Switzerland. A parallel project carried out in Germany is mentioned. A large variation in the degree of fouling in the various hydro power stations is noted. Sources such as leaves in autumn and algae are discussed, as are the various rinsing procedures used to clear the turbines of fouling. Power losses are discussed and measures that can be taken to prevent fouling are described. Measurements made at an installation in Freienstein, Switzerland, are presented and discussed. The report is completed with an appendix containing calculations, details on the Freienstein power plant and the results of interviews made with the ten hydro power installations examined.

  1. Full cost accounting for decision making at Ontario Hydro

    International Nuclear Information System (INIS)

    Plagiannakos, T.

    1996-01-01

    Ontario Hydro's approach to full cost accounting (FCA) was outlined in response to questions raised earlier, in another forum, regarding Ontario Hydro's views on FCA. FCA was defined as an evaluation framework (as opposed to an accounting system) which tries to account for the internal (private) as well as the external (environment and human health) costs and benefits and integrate them into business decisions. When the external impacts cannot be monetized, qualitative evaluations are used based on the damage costing approach, which Ontario Hydro prefers to the cost of control method recommended by its critics. In general, however, Ontario Hydro is not opposed to FCA in so far as it puts the Utility in a better position to make more informed decisions, improve environmental cost management, avoid future costs, enhance revenue, improve environmental quality, contribute to environmental policy, and contribute to sustainable development. 1 fig

  2. River engineering

    NARCIS (Netherlands)

    De Vries, M.

    1993-01-01

    One dimension models - basic eauations, analytical models, numberical models. One dimensional models -suspended load, roughness and resistance of river beds. Solving river problems - tools, flood mitigation, bank protection.

  3. Pumped Storage Hydro Power Plant Cierny Vah

    International Nuclear Information System (INIS)

    Regula, E.

    1998-01-01

    In this leaflet the pump-storage power plant Cierny Vah is presented. A Cierny Vah pumped storage power plant (PSP) has been designed and built for providing the reliable and quality electric energy supply and for covering load changes of an electrification system. (ES). It is mainly the pumped storage hydro power plants plants which in our conditions are the sources operatively covering the sudden changes of the ES load from the ecological, economic but mainly from the operational point of view. The electric energy generation volume is not the primary standpoint but especially their control functions in the ES. During the building of the Cierny Vah PSP the peak operation with the daily accumulation, participation in frequency control and output in ES and the compensation function in ES were to be its main tasks. After putting it into operation by especially after its becoming independent of the Slovak ES in 1994 the static functions (energy generation from pumping, balance output reserves, daily control, ...) gave way to dynamic functions which gained greater importance. After interconnection of the ES with the UCPTE West European Association in which there are besides other things, the strict criteria for observing balance outputs, the main functions of PSPs are as follows: (1) Dynamic services for ES; (2) Dispatching reserve for the fall out of the greatest ES block; (3) Observing the foreign cooperation balance agreed; (4) Compensation of peaks and also of sudden daily load diagram reductions. Technical parameters of the upper and lower reservoir are described. The hydro power plant is a body lower reservoir. In it there are six vertical pumping aggregates in the three machine layout: the motor-generator - the turbine - the pump. Between the turbine and the pump there is a hydraulically controlled claw clutch engaging at rest and disengaging also during the aggregate operation. During pumping air is involved inside the turbine. The Francis turbines have a

  4. The ecological evaluation of Debed River Watershed basin in Armenia by Hydro physical, Hydrochemical and Hydro biological parameters

    International Nuclear Information System (INIS)

    Danielan, A.

    2009-01-01

    The environmental researches are foremost in todays Armenia. During the last years seemed economic growth in country means additional pressure to environment, especially without introducing resources economizing new technologies. The water resources play important role for development of economy in Armenia. The pollution of surface waters, not complete management of water resources are really problems in the field of water resources management. (Author)

  5. Hydro-Quebec strategic plan 2006-2010

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec produces, transmits and distributes electricity through the use of renewable energy sources, particularly hydroelectricity. It also conducts research in energy related fields. This document listed the strategic plan for Hydro-Quebec's 4 main divisions: Hydro-Quebec Production, Hydro-Quebec TransEnergie, Hydro-Quebec Distribution and Hydro-Quebec Energy Society of Bay James. The 2006 to 2010 strategic plan continues to focus on 3 main priorities: energy efficiency; complementary development of hydroelectricity and wind power; and, technological innovation. Hydro-Quebec's objectives also include strengthening the security of Quebec's energy supply and making use of energy as a lever for economic development. The plan for Hydro-Quebec Production calls for accelerating the development of major hydroelectric projects and promoting other renewable forms of energy such as wind power and ensuring the efficiency and reliability of the generating fleet. The utility's objective is to reach 4.7 TWh in energy savings by 2010 and to work toward a target of 8 TWh by 2015. The plan also involves a portfolio of hydroelectric projects totaling 5,400 MW. The plan includes complementary development and integration of 4,000 MW of windpower by 2015. The plan for Hydro-Quebec TransEnergie calls for system reliability and becoming a world benchmark for quality and reliability in wind power integration and deployment of new technologies to enhance performance. The plan for Hydro-Quebec Distribution calls for more efficient use of electricity, increase customer satisfaction and meet electricity needs through the use of renewable energy sources. The utility has made a commitment for 2006 to 2010 to a net income of $2.5 billion per year for a total of $12.5 billion, and a capital investment of 19.4 billion. This paper outlined the contribution of each division to net income and listed the economic benefits for the 2006 to 2010 period. In 2006, the Quebec Energy Board authorized

  6. Pico hydro turbines for electricity in rural areas

    OpenAIRE

    Descotte, Gérard

    2016-01-01

    This article discusses the feedback and lessons learned, particularly from a survey carried out following the deployment program of a pico hydro power solution in a very isolated rural area in north Laos. This project is part of the strategic development for the rural electrification of Laos, in which pico hydro power facilities constitute the main avenue of progress for the electrification of isolated villages.

  7. BLUE GOLD: HYDRO-ELECTRIC RENT IN CANADA

    OpenAIRE

    Glenn Jenkins; RICHARD ZUKER

    1984-01-01

    In this study, an attempt is made to develop estimates of the value of economic rent from production of hydro-electricity. These estimates are made for the year 1979, which is the latest period for which a comprehensive set of data was available at the time this work was undertaken. The estimates are developed for the hydro-electricity generated (or used) by electric utilities in four provinces: Quebec (including Churchill Falls), Ontario, Manitoba and British Columbia. These electric systems...

  8. Small hydro plant- present scenario and future prospects

    International Nuclear Information System (INIS)

    Purohit, D.P.

    1996-01-01

    The article, deals with the methodology of power generation by small hydro power resources, especially in the Himalayan and sub Himalayan regions and the benefits it will bestow to the inhabitants of this region. The development of small hydro power projects in the Himalayas and sub Himalayas would serve as a model for environment- friendly sources of energy to benefit small communities world wide. The use of water turbine generators for the generation of cheaper power is also discussed. 4 refs

  9. New directions in nuclear waste disposal in Ontario Hydro

    International Nuclear Information System (INIS)

    Nash, K.

    1996-01-01

    Ontario Hydro Nuclear has financial, environmental, safety and public acceptance business objectives which must be met to achieve long term sustainable success. Short term objectives of achieving nuclear excellence in safety, cost and production are vital to this success. Ontario Hydro's nuclear waste and decommissioning liabilities must be managed within these objectives. This paper outlines the financial environmental and societal considerations and responsibility framework for managing these liabilities. (author)

  10. Numerical modelling of hydro-morphological processes dominated by fine suspended sediment in a stormwater pond

    Science.gov (United States)

    Guan, Mingfu; Ahilan, Sangaralingam; Yu, Dapeng; Peng, Yong; Wright, Nigel

    2018-01-01

    Fine sediment plays crucial and multiple roles in the hydrological, ecological and geomorphological functioning of river systems. This study employs a two-dimensional (2D) numerical model to track the hydro-morphological processes dominated by fine suspended sediment, including the prediction of sediment concentration in flow bodies, and erosion and deposition caused by sediment transport. The model is governed by 2D full shallow water equations with which an advection-diffusion equation for fine sediment is coupled. Bed erosion and sedimentation are updated by a bed deformation model based on local sediment entrainment and settling flux in flow bodies. The model is initially validated with the three laboratory-scale experimental events where suspended load plays a dominant role. Satisfactory simulation results confirm the model's capability in capturing hydro-morphodynamic processes dominated by fine suspended sediment at laboratory-scale. Applications to sedimentation in a stormwater pond are conducted to develop the process-based understanding of fine sediment dynamics over a variety of flow conditions. Urban flows with 5-year, 30-year and 100-year return period and the extreme flood event in 2012 are simulated. The modelled results deliver a step change in understanding fine sediment dynamics in stormwater ponds. The model is capable of quantitatively simulating and qualitatively assessing the performance of a stormwater pond in managing urban water quantity and quality.

  11. Interaction between GIS and hydrologic model: A preliminary approach using ArcHydro Framework Data Model

    Directory of Open Access Journals (Sweden)

    Silvio Jorge C. Simões

    2013-08-01

    Full Text Available In different regions of Brazil, population growth and economic development can degrade water quality, compromising watershed health and human supply. Because of its ability to combine spatial and temporal data in the same environment and to create water resources management (WRM models, the Geographical Information System (GIS is a powerful tool for managing water resources, preventing floods and estimating water supply. This paper discusses the integration between GIS and hydrological models and presents a case study relating to the upper section of the Paraíba do Sul Basin (Sao Paulo State portion, situated in the Southeast of Brazil. The case study presented in this paper has a database suitable for the basin’s dimensions, including digitized topographic maps at a 50,000 scale. From an ArcGIS®/ArcHydro Framework Data Model, a geometric network was created to produce different raster products. This first grid derived from the digital elevation model grid (DEM is the flow direction map followed by flow accumulation, stream and catchment maps. The next steps in this research are to include the different multipurpose reservoirs situated along the Paraíba do Sul River and to incorporate rainfall time series data in ArcHydro to build a hydrologic data model within a GIS environment in order to produce a comprehensive spatial temporal model.

  12. Reversible pumped hydro - benefits and challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Torbjoern K.; Walseth, Eve C.

    2010-07-01

    Full text: The Norwegian hydro power system is dominated with high head turbines, Pelton and Francis with high capacity in the reservoirs. Originally they were built for secure energy supply. In the system there are also reversible pump turbine (RPT) plants where in times with spare energy, made it possible to pump water from the lower reservoir to the higher. Again the idea was to secure energy supply, which meant pumping in early autumn to fill the reservoirs for winter. In the recent years, a more active use of the RPT plants has been actualized. The free market made price difference between night and day interesting, hence a more frequent pumping was desirable. In the coming years, new-renewable energy sources will utterly enhance a more active use of the RPT plants. More active use of the RPT plants means more frequent starts and stops, both in pumping and in turbine mode. There are a lot of challenges in adopting a new strategy for operating the machinery. More effective start equipment is required. The machinery will be exposed to more frequent dynamic loads; the turbines will be run at part- and full load. The existing RPT plants are connected to huge reservoirs. That means the RPTs are not only for short sighted power regulations, as many RPT-plants in Europe, but are also capable for a substantial energy production. In Norway, the nature is very suitable for RPT plants, both in connection with existing power plants, were reservoirs and conduits are already established, and standing alone with a minimum of energy production. RPTs are, as a design, a compromise between effective generating and stable as well as effective pumping. Stable pumping often results in very steep flow-speed characteristics when operating as a turbine. When dealing with hydraulic transients these characteristics cause a higher change in flow and torque leading to instability during start-up and possible off-design operation point. The instability slows down the synchronization

  13. THE USING OF GRAPHICAL EDITOR IN THE ENGINEERING GRAPHICS AND THE COURSE DESIGNING

    Directory of Open Access Journals (Sweden)

    KARPYUK L. V.

    2016-08-01

    Full Text Available The problems of learning students of the engineering and computer graphics of the course on the base of computer-aided design (CAD were described in the article. The examples of training tasks for acquiring knowledge of work in the environment of graphical editor of AutoCAD were shown. These examples are needed to perform drawings on The Engineering Graphics, and also for a graphic part of Course Projects for students of mechanical specialties.

  14. New construction of the Wespimuehle small hydro power station in Winterthur, Switzerland; Stadt Winterthur (ZH). Neubau Kleinwasserkraftwerk Wespimuehle - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-12-15

    This report for the Swiss Federal Office of Energy (SFOE) presents a project concerning the renewal of an existing small hydro installation in the historical Wespimuehle on the Toess river in Winterthur, Switzerland. The existing installation is described as is the station's present concession. The proposals for the renewal of this installation are described and discussed, including water intake, electro-mechanical components and the station's tail water channel. The necessary building work and access to the installations are discussed. Investment, operating and maintenance costs are discussed. The expected profits to be gained from the new installation and the risks involved in the project are discussed.

  15. Graphical User Interface in Art

    Science.gov (United States)

    Gwilt, Ian

    This essay discusses the use of the Graphical User Interface (GUI) as a site of creative practice. By creatively repositioning the GUI as a work of art it is possible to challenge our understanding and expectations of the conventional computer interface wherein the icons and navigational architecture of the GUI no longer function as a technological tool. These artistic recontextualizations are often used to question our engagement with technology and to highlight the pivotal place that the domestic computer has taken in our everyday social, cultural and (increasingly), creative domains. Through these works the media specificity of the screen-based GUI can broken by dramatic changes in scale, form and configuration. This can be seen through the work of new media artists who have re-imagined the GUI in a number of creative forms both, within the digital, as image, animation, net and interactive art, and in the analogue, as print, painting, sculpture, installation and performative event. Furthermore as a creative work, the GUI can also be utilized as a visual way-finder to explore the relationship between the dynamic potentials of the digital and the concretized qualities of the material artifact.

  16. A Theoretical Analysis of Learning with Graphics--Implications for Computer Graphics Design.

    Science.gov (United States)

    ChanLin, Lih-Juan

    This paper reviews the literature pertinent to learning with graphics. The dual coding theory provides explanation about how graphics are stored and precessed in semantic memory. The level of processing theory suggests how graphics can be employed in learning to encourage deeper processing. In addition to dual coding theory and level of processing…

  17. On the Role of Computer Graphics in Engineering Design Graphics Courses.

    Science.gov (United States)

    Pleck, Michael H.

    The implementation of two- and three-dimensional computer graphics in a freshmen engineering design course at the university level is described. An assessment of the capabilities and limitations of computer graphics is made, along with a presentation of the fundamental role which computer graphics plays in engineering design instruction.…

  18. Q-Technique and Graphics Research.

    Science.gov (United States)

    Kahle, Roger R.

    Because Q-technique is as appropriate for use with visual and design items as for use with words, it is not stymied by the topics one is likely to encounter in graphics research. In particular Q-technique is suitable for studying the so-called "congeniality" of typography, for various copytesting usages, and for multivariate graphics research. The…

  19. Graphic Organizers: Outlets for Your Thoughts.

    Science.gov (United States)

    Ekhaml, Leticia

    1998-01-01

    Graphs, bars, charts, and diagrams have been used by designers, writers, and scientists to communicate. Now, research suggests that graphic organizers benefit teaching and learning. This article describes graphic organizers: sequential, conceptual, hierarchical, cyclical, Venn, fishbone or Ishikawa, squeeze and stretch, why-why, t-chart, KWL…

  20. Deconstruction and Graphic Design: History Meets Theory.

    Science.gov (United States)

    Lupton, Ellen; Miller, J. Abbott

    1994-01-01

    Considers the reception and use of deconstruction in the recent history of graphic design. Considers the place of graphics within the theory of deconstruction in the work of philosopher Jacques Derrida. Argues that deconstruction is not a style but a mode of questioning through and about the technologies, formal devices, social institutions and…

  1. Introduction to Graphics Programming in Java

    DEFF Research Database (Denmark)

    Rosendahl, Mads

    Writing graphics applications in Java using Swing can be quite a daunting experience which requires understanding of some large libraries, and fairly advanced aspects of Java. In these notes we will show that by using a small subset of the Swing package we can write a write range of graphics...

  2. A Laboratory Application of Microcomputer Graphics.

    Science.gov (United States)

    Gehring, Kalle B.; Moore, John W.

    1983-01-01

    A PASCAL graphics and instrument interface program for a Z80/S-100 based microcomputer was developed. The computer interfaces to a stopped-flow spectrophotometer replacing a storage oscilloscope and polaroid camera. Applications of this system are discussed, indicating that graphics and analog-to-digital boards have transformed the computer into…

  3. Using Graphic Organizers in Intercultural Education

    Science.gov (United States)

    Ciascai, Liliana

    2009-01-01

    Graphic organizers are instruments of representation, illustration and modeling of information. In the educational practice they are used for building, and systematization of knowledge. Graphic organizers are instruments that addressed mostly visual learning style, but their use is beneficial to all learners. In this paper we illustrate the use of…

  4. Making Art Connections with Graphic Organizers

    Science.gov (United States)

    Stephens, Pam; Hermus, Cindy

    2007-01-01

    Posters, slide shows, videos, diagrams, charts, written or illustrated class notes, daily logs, to do lists, and written instructions are all helpful modes of teaching for visual learners. Another form of instruction that is helpful for visual learners is the graphic organizers. Sometimes called "mind maps", graphic organizers are illustrative…

  5. Spatial Ability through Engineering Graphics Education

    Science.gov (United States)

    Marunic, Gordana; Glazar, Vladimir

    2013-01-01

    Spatial ability has been confirmed to be of particular importance for successful engineering graphics education and to be a component of human intelligence that can be improved through instruction and training. Consequently, the creation and communication by means of graphics demand careful development of spatial skills provided by the balanced…

  6. Graphics with Special Interfaces for Disabled People.

    Science.gov (United States)

    Tronconi, A.; And Others

    The paper describes new software and special input devices to allow physically impaired children to utilize the graphic capabilities of personal computers. Special input devices for computer graphics access--the voice recognition card, the single switch, or the mouse emulator--can be used either singly or in combination by the disabled to control…

  7. Standards of Multimedia Graphic Design in Education

    Science.gov (United States)

    Aldalalah, Osamah Ahmad; Ababneh, Ziad Waleed Mohamed

    2015-01-01

    This study aims to determine Standards of Multimedia Graphic Design in Education through the analysis of the theoretical basis and previous studies related to this subject. This study has identified the list of standards of Multimedia, Graphic Design, each of which has a set indicator through which the quality of Multimedia can be evaluated in…

  8. Determining Normal-Distribution Tolerance Bounds Graphically

    Science.gov (United States)

    Mezzacappa, M. A.

    1983-01-01

    Graphical method requires calculations and table lookup. Distribution established from only three points: mean upper and lower confidence bounds and lower confidence bound of standard deviation. Method requires only few calculations with simple equations. Graphical procedure establishes best-fit line for measured data and bounds for selected confidence level and any distribution percentile.

  9. ABOUT THE ROMANIAN SOCIETY FOR ENGINEERING GRAPHICS

    Directory of Open Access Journals (Sweden)

    SIMION Ionel

    2015-06-01

    Full Text Available SORGING is a non-profit, non-governmental society, opened to all professionals interested in Engineering Graphics and Design. It aims to promote the research, development and innovation activities, together with the dissemination of best practices and assistance for educational purposes. In this paper the research and educational activities of the Romanian Society for Engineering Graphics will be briefly reviewed.

  10. Teaching Graphics in Technical Communication Classes.

    Science.gov (United States)

    Spurgeon, Kristene C.

    Perhaps because the United States is undergoing a video revolution, perhaps because of its increasing sales of goods to non-English speaking markets where graphics can help explain the products, perhaps because of the decreasing communication skills of the work force, graphic aids are becoming more and more widely used and more and more important.…

  11. Graphic Design in Libraries: A Conceptual Process

    Science.gov (United States)

    Ruiz, Miguel

    2014-01-01

    Providing successful library services requires efficient and effective communication with users; therefore, it is important that content creators who develop visual materials understand key components of design and, specifically, develop a holistic graphic design process. Graphic design, as a form of visual communication, is the process of…

  12. User-Extensible Graphics Using Abstract Structure,

    Science.gov (United States)

    1987-08-01

    Flex 6 The Algol68 model of the graphical abstract structure 5 The creation of a PictureDefinition 6 The making of a picture from a PictureDefinition 7...data together with the operations that can be performed on that data. i 7! ś I _ § 4, The Alqol68 model of the graphical abstract structure Every

  13. Collaborating on a Graphic Medicine Novel

    DEFF Research Database (Denmark)

    Frølunde, Lisbeth

    2018-01-01

    The presentation centers on establishing creative collaborations to support the production of my graphic novel (Family Anecdotes) about mourning and mental health. I explore various challenges of authoring an “autobiofictional" graphic medicine novel – as an arts-based communication researcher, a...

  14. Adolescents' Motivations for Viewing Graphic Horror.

    Science.gov (United States)

    Johnston, Deirdre D.

    1995-01-01

    Identifies four motivations adolescents report for viewing graphic horror films: gore watching, thrill watching, independent watching, and problem watching. Argues that viewing motivations are predictors of responses to graphic horror. Finds that viewing motivations were related to viewers' cognitive and affective responses and a tendency to…

  15. A study of perceptions of graphical passwords

    CSIR Research Space (South Africa)

    Vorster, JS

    2015-10-01

    Full Text Available Depending on the graphical password schema, the key-space can be even bigger than alpha-numeric passwords. However, in conventional passwords, users will re-use letters within a password. This study investigates graphical passwords for symbol...

  16. Mastering probabilistic graphical models using Python

    CERN Document Server

    Ankan, Ankur

    2015-01-01

    If you are a researcher or a machine learning enthusiast, or are working in the data science field and have a basic idea of Bayesian learning or probabilistic graphical models, this book will help you to understand the details of graphical models and use them in your data science problems.

  17. Perspectives on sustainable development in the Moose River basin

    Energy Technology Data Exchange (ETDEWEB)

    Preston, R.J.; George, P.J. [McMaster Univ., Hamilton, ON (Canada); Berkes, F. [Manitoba Univ., Winnipeg, MB (Canada)

    1995-12-31

    The environmental, economic and sociocultural determinants of sustainable development in the Cree communities of the Mushkegowuk region of the Hudson and James Bay lowlands of Ontario were analyzed. The Cree perspectives on sustainable development versus the perspective of industrial developers such as Ontario Hydro, and the contrast between the two, were outlined. In 1990, Ontario Hydro released their long term demand and supply plan report. Their proposals included new generating stations and the development of existing sites in the Moose River drainage basin. Ontario Hydro`s perspective was that they were using an otherwise under-utilized resource, and creating employment at the same time. By contrast, the Cree demanded a thorough assessment of cumulative impacts of development of the Moose River region, the impact on the Cree communities, and the cumulative effects on the much larger Hudson Bay region. They drew attention to the vulnerability of the local land-based economy, and the damage caused by past hydroelectric and other industrial development projects. The situation is a good illustration of the basic dilemma for development planning in the Moose River region, and indeed for much of the Canadian north. It is the view of these authors that the recipe for a viable development strategy for the region should involve continued reliance on transfer payments and investments in renewable resource-based industry and local services, not as a transition stage, but as a culturally, economically and ecologically sustainable arrangement in its own right. 32 refs., 1 tab., 2 figs.

  18. Biogen water of the Irtysh river - the principal population health factor suffered from the nuclear test on the Semipalatinsk test site

    International Nuclear Information System (INIS)

    Inyushin, V.M.; Yurenkov, V.V.

    2001-01-01

    Authors notes, that Semipalatinsk test site activity together with other factors changes a water quality. The principal consequence of nuclear tests is build up in new cells by the 'pathogenous' water in plants, animals and human . 'Pathogenous water' is generating at steady changes of electronic strictures (spin performances) at ionizing radiation effect, radionuclides and other factors of nuclear explosions. These factors were did not known to a world-wide science. The second of very important phenomenon of nuclear explosions consequences at the Semipalatinsk test site is reduce of the hydro-plasma in the water sources the Irtysh River basin. This was proved with direct studies microcurrents density in the water as well as analysis of electronic and ionic structures with the plasma-graphic help. The water having the pathogenous memory - building up in the cells - reduces the immune status, negatively reflects on the vital functions, decreasing the resistance to unfavorable effects. It is offered for remediation of the 'pathogenous water' to use the bio-genized water as most adequate one to endogenous water of living cells. Mass usage of the bio-genized water takes out genetic consequences of nuclear explosions and increase of an immunity level. The 'Bio-genization' of the Irtysh River water is concludes a few stages

  19. The graphics future in scientific applications

    International Nuclear Information System (INIS)

    Enderle, G.

    1982-01-01

    Computer graphics methods and tools are being used to a great extent in scientific research. The future development in this area will be influenced both by new hardware developments and by software advances. On the hardware sector, the development of the raster technology will lead to the increased use of colour workstations with more local processing power. Colour hardcopy devices for creating plots, slides, or movies will be available at a lower price than today. The first real 3D-workstations appear on the marketplace. One of the main activities on the software sector is the standardization of computer graphics systems, graphical files, and device interfaces. This will lead to more portable graphical application programs and to a common base for computer graphics education. (orig.)

  20. Animated GIFs as vernacular graphic design

    DEFF Research Database (Denmark)

    Gürsimsek, Ödül Akyapi

    2016-01-01

    and often a mix of some of these modes, seem to enable participatory conversations by the audience communities that continue over a period of time. One example of such multimodal digital content is the graphic format called the animated GIF (graphics interchange format). This article focuses on content......Online television audiences create a variety of digital content on the internet. Fans of television production design produce and share such content to express themselves and engage with the objects of their interest. These digital expressions, which exist in the form of graphics, text, videos...... as design, both in the sense that multimodal meaning making is an act of design and in the sense that web-based graphics are designed graphics that are created through a design process. She specifically focuses on the transmedia television production entitled Lost and analyzes the design of animated GIFs...

  1. An overview on small hydro in Brazil

    International Nuclear Information System (INIS)

    Filho, G.T.

    2008-01-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km 2 . It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  2. Environmental flows in hydro-economic models

    Science.gov (United States)

    Pereau, Jean-Christophe; Pryet, Alexandre

    2018-03-01

    The protection of environmental flows, as a management objective for a regulating agency, needs to be consistent with the aquifer water balance and the degree of resource renewability. A stylized hydro-economic model is used where natural recharge, which sustains environmental flows, is considered both in the aquifer water budget and in the welfare function as ecosystem damage. Groundwater recharge and the associated natural drainage may be neglected for aquifers containing fossil water, where the groundwater is mined. However, when dealing with an aquifer that constitutes a renewable resource, for which recharge is not negligible, natural drainage should explicitly appear in the water budget. In doing so, the optimum path of net extraction rate does not necessarily converge to the recharge rate, but depends on the costs associated with ecosystem damages. The optimal paths and equilibrium values for the water volume and water extraction are analytically derived, and numerical simulations based on the Western La Mancha aquifer (southwest Spain) illustrate the theoretical results of the study.

  3. Prepared by Thermal Hydro-decomposition

    Science.gov (United States)

    Prasoetsopha, N.; Pinitsoontorn, S.; Kamwanna, T.; Kurosaki, K.; Ohishi, Y.; Muta, H.; Yamanaka, S.

    2014-06-01

    The polycrystalline samples of Ca3Co4- x Ga x O9+ δ (0 ≤ x ≤ 0.15) were prepared by a simple thermal hydro-decomposition method. The high density ceramics were fabricated using a spark plasma sintering technique. The crystal structure of calcined powders was characterized by x-ray diffraction. The single phase of Ca3Co4- x Ga x O9+ δ was obtained. The scanning electron micrograph illustrated the grain alignment perpendicular to the direction of the pressure in the sintering process. The evidence from x-ray absorption near edge spectra were used to confirm the oxidation state of the Ga dopant. The thermoelectric properties of the misfit-layered of Ca3Co4- x Ga x O9+ δ were investigated. Seebeck coefficient tended to decrease with increasing Ga content due to the hole-doping effect. The electrical resistivity and thermal conductivity were monotonically decreased with increasing Ga content. The Ga doping of x = 0.15 showed the highest power factor of 3.99 × 10-4 W/mK2 at 1,023 K and the lowest thermal conductivity of 1.45 W/mK at 1,073 K. This resulted in the highest ZT of 0.29 at 1,073 K. From the optical absorption spectra, the electronic structure near the Fermi level show no significant change with Ga doping.

  4. An overview on small hydro in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Filho, G.T. [Federal Univ. of Itajuba (Brazil). National Reference Centre for Small Hydro

    2008-07-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km{sup 2}. It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  5. User experience with HydroHelp programs

    Energy Technology Data Exchange (ETDEWEB)

    Verner, J.S. [Brookfield Power, Gatineau, PQ (Canada)

    2009-07-01

    Advances in the field of geographical information systems (GIS) have simplified the process of finding suitable sites for new hydroelectric projects. However, estimating the construction cost remains a challenge. The HydroHelp program is a cost evaluation program developed specifically to determine if a project will be economically feasible. The program is made up of 4 programs, depending on the type of turbine suitable for the site. Once a turbine selection is made, users can choose the program according to Kaplan, Impulse or Francis turbines. Users must rely on GIS, since the program requires a thorough understanding of the site geology and topography. Knowledge of hydroelectric plants is also necessary in order to obtain a credible construction cost. This paper demonstrated the capacity and flexibility of the software along with its different functions and available options. A detailed cost breakdown can be obtained along with an energy estimate and project specifications. In addition, the software can be used to optimize the project through different options by changing the facility's layout in terms of the type of dam, spillway, conduit length and diameter, turbine type and flood level. 17 figs.

  6. Post Chernobyl safety review at Ontario Hydro

    International Nuclear Information System (INIS)

    Frescura, G.M.; Luxat, J.C.; Jobe, C.

    1991-01-01

    It is generally recognized that the Chernobyl Unit 4 accident did not reveal any new phenomena which had not been previously identified in safety analyses. However, the accident provided a tragic reminder of the potential consequences of reactivity initiated accidents (RIAs) and stimulated nuclear plant operators to review their safety analyses, operating procedures and various operational and management aspects of nuclear safety. Concerning Ontario Hydro, the review of the accident performed by the corporate body responsible for nuclear safety policy and by the Atomic Energy Control Board (the Regulatory Body) led to a number of specific recommendations for further action by various design, analysis and operation groups. These recommendations are very comprehensive in terms of reactor safety issues considered. The general conclusion of the various studies carried out in response to the recommendations, is that the CANDU safety design and the procedures in place to identify and mitigate the consequences of accidents are adequate. Improvements to the reliability of the Pickering NGSA shutdown system and to some aspects of safety management and staff training, although not essential, are possible and would be pursued. In support of this conclusion, the paper describes some of the studies that were carried out and discusses the findings. The first part of the paper deals with safety design aspects. While the second is concerned with operational aspects

  7. Hydro-Quebec annual report 1995

    International Nuclear Information System (INIS)

    1995-01-01

    Progress in providing services, in financial and human relations management aspects, and future outlook for Hydro-Quebec was summarized in the 1995 annual report. Environmental policy of the Corporation was updated to reflect international concepts of sustainable development and environment management. A program was launched to remove, recycle and eliminate contaminants. Although generating systems will not be expanded between 1997 and the year 2000, existing generating facilities will be revitalized to improve their capacity and performance. As part of aggressive marketing of surplus capacity abroad, the creation during the past year of the first U.S. subsidiary, HQ Energy Services, was announced. Net income for the year was reported at $390 million, decreased by $277 million since 1994, due to financial pressure created by the commissioning of installations, including those at Phase II of the La Grande complex, and the slowdown in electricity sales in Quebec. A net income of close to $500 million was forecast for 1996. To achieve this target the Corporation announced plans to reduce operating expenses, an exercise which will include staff reductions and a wage freeze. tabs., figs

  8. Hydro makes the most of driftwood

    Energy Technology Data Exchange (ETDEWEB)

    Shinjo, Takahisa [Electric Power Development Company, Tokyo (Japan)

    2001-05-01

    The Electric Power Development Company (EPDC), which owns and operates 58 hydro power plants and controls 40 reservoirs, is reaping benefits from the driftwood collected from the reservoirs. Large amounts of driftwood, litter and illegally dumped wastes are removed from the company's reservoirs every year. The driftwood was previously incinerated but a new processing system is now used which is more cost-effective and has less impact on the environment. EPDC has installed carbonisation kilns and chipping systems at a number of its sites. The end-products (charcoal, wood vinegar and chips) are sold to offset the costs of driftwood processing. The properties of driftwood charcoal make it suitable for a number of applications (eg absorption, deodorisation, soil improvement and humidity control), while pulverised charcoal is sold as a fuel, as a deodorant for drinking water and for humidity control sheets. The wood vinegar has been used as a preservative, in insecticides and to promote plant growth. Refining the wood vinegar has allowed EPDC to develop cosmetics and face creams. Chips are sold to a plywood manufacturer or used as an organic fertiliser.

  9. Hydro-climatic conditions and thermoelectric electricity generation – Part I: Development of models

    International Nuclear Information System (INIS)

    Koch, Hagen; Vögele, Stefan

    2013-01-01

    In recent years there have been several heat waves affecting the use of thermoelectric power plants, e.g. in Europe and the U.S. In this paper the linkage between hydro-climatic conditions and possible electricity generation restrictions is described. The coupling of hydrological models and a power plant model is presented. In this approach each power plant is considered separately with its technical specifications. Also environmental regulations, e.g. permissible rise in the cooling water temperature, are considered for the respective power plant. The hydrological models developed to simulate river runoff and water temperature are also site specific. The approach presented is applied to Krümmel nuclear power plant in Germany. Analysed are the uncertainties with regard to electricity generation restrictions on account of climatic developments and corresponding higher water temperatures and low flows. Overall, increased water temperatures and declining river runoff lead to more frequent and more severe generation restrictions. It is concluded that the site-specific approach is necessary to reliably simulate power plants water demand, river runoff and water temperature. Using a simulation time step of one day, electricity generation restrictions are significantly higher than for simulations at monthly time step. - Highlights: • An approach to assess climate effects on electricity generation is presented. • Site specific models for power plants, water temperature and discharge are used. • Monthly and daily simulation time-steps give different results. • Climate change effects on generation depend on cooling system and climate scenario

  10. 735 kV air-blast circuit breakers for Hydro Quebec

    Energy Technology Data Exchange (ETDEWEB)

    Lindstrom, I

    1966-01-01

    In 1962 the Quebec Hydro-Electric Commission started the development of aproject for utilizing water power in Manicouagan and Outardes, two rivers some 350 miles northeast of the city of Montreal on the left bank of the St. Lawrence estuary. The project involved the transmission of power at 735 kV ac from Manicouagan and Outardes to the heavy and growing load centers of Quebec and Montreal. The total amount of energy to be transmitted in the final stage is about 6,000 MW. The project involved the need of considerable quantities of apparatus for 735 kV, such as transformers, reactors, lightning arrestors, circuit-breakers, and disconnectors. Since the supply of the major part of the 735 kV circuit-breakers, altogether 14 three-pole units, was awarded to ASEA in Sweden, a short presentation of these airblast circuit-breakers is presented.

  11. Assessment of the Effects of Various Precipitation Forcings on Flood Forecasting Potential Using WRF-Hydro Modeling

    Science.gov (United States)

    Zhang, J.; Fang, N. Z.

    2017-12-01

    A potential flood forecast system is under development for the Upper Trinity River Basin (UTRB) in North Central of Texas using the WRF-Hydro model. The Routing Application for the Parallel Computation of Discharge (RAPID) is utilized as channel routing module to simulate streamflow. Model performance analysis was conducted based on three quantitative precipitation estimates (QPE): the North Land Data Assimilation System (NLDAS) rainfall, the Multi-Radar Multi-Sensor (MRMS) QPE and the National Centers for Environmental Prediction (NCEP) quality-controlled stage IV estimates. Prior to hydrologic simulation, QPE performance is assessed on two time scales (daily and hourly) using the Community Collaborative Rain, Hail and Snow Network (CoCoRaHS) and Hydrometeorological Automated Data System (HADS) hourly products. The calibrated WRF-Hydro model was then evaluated by comparing the simulated against the USGS observed using various QPE products. The results imply that the NCEP stage IV estimates have the best accuracy among the three QPEs on both time scales, while the NLDAS rainfall performs poorly because of its coarse spatial resolution. Furthermore, precipitation bias demonstrates pronounced impact on flood forecasting skills, as the root mean squared errors are significantly reduced by replacing NLDAS rainfall with NCEP stage IV estimates. This study also demonstrates that accurate simulated results can be achieved when initial soil moisture values are well understood in the WRF-Hydro model. Future research effort will therefore be invested on incorporating data assimilation with focus on initial states of the soil properties for UTRB.

  12. Ekstraksi Minyak Atsiri Dari Akar Wangi Menggunakan Metode Steam - Hydro distillation dan Hydro distilation dengan Pemanas Microwave

    Directory of Open Access Journals (Sweden)

    Maulana M Al Hanief

    2013-09-01

    Full Text Available Penelitian ini bertujuan untuk memperoleh minyak atsiri dari akar wangi dengan modifikasi metode steam-hydro distillation dan hydro distillation yaitu menggunakan pemanasan microwave kemudian membandingkan hasilnya dengan penelitian sebelumnya. Modifikasi ini diharapkan lebih efisien dalam masalah lama penyulingan dan kualitas serta kuantitas rendemen minyak yang lebih baik dan banyak. Penelitian ini menggunakan dua metode yaitu steam-hydro distillation dan hydro distillation dengan pemanfaatan gelombang mikro. Bahan baku yang digunakan dalam penelitian adalah akar wangi jenis pulus wangi yang tumbuh di Kabupaten Garut, Jawa Barat. Variabel yang digunakan adalah bahan baku yang dicacah dan bahan baku utuh dengan variasi massa bahan 50 gr, 60, gr, 70 gr, 80 gr, dan 90 gr dengan pelarut air sebanyak 450 ml dalam labau distiller berukuran 1000 ml. Lama penyulingan adalah lima jam dengan pengamatan tiap 30 menit serta daya yang digunakan adalah 400 Watt. Analisa terhadap hasil minyak atsiri yang diperoleh antara lain analisa GC-MS, spesific gravity, indeks bias, dan bilangan asam. Hasil dari penelitian ini dibandingkan dengan hasil penelitian terdahulu yang tidak memanfaatkan gelombang mikro. Dari hasil penelitian diperoleh % rendemen kumulatif, sifat fisik, sifat kimia, dan kandungan komponen minyak dari metode steam-hydro distillation lebih baik dibandingkan metode hydro distillation ditandai dengan kuantitas dan kualitas yang sesuai dengan SNI.  Sementara itu jika dibandingkan dengan metode terdahulu dapat disimpulkan bahwa penggunaan gelombang mikro lebih efisien dalam waktu dan kuantitas serta kualitas minyak yang lebih baik dibandingkan tanpa penggunaan gelombang mikro

  13. Satellite Based Probabilistic Snow Cover Extent Mapping (SCE) at Hydro-Québec

    Science.gov (United States)

    Teasdale, Mylène; De Sève, Danielle; Angers, Jean-François; Perreault, Luc

    2016-04-01

    Over 40% of Canada's water resources are in Quebec and Hydro-Quebec has developed potential to become one of the largest producers of hydroelectricity in the world, with a total installed capacity of 36,643 MW. The Hydro-Québec fleet park includes 27 large reservoirs with a combined storage capacity of 176 TWh, and 668 dams and 98 controls. Thus, over 98% of all electricity used to supply the domestic market comes from water resources and the excess output is sold on the wholesale markets. In this perspective the efficient management of water resources is needed and it is based primarily on a good river flow estimation including appropriate hydrological data. Snow on ground is one of the significant variables representing 30% to 40% of its annual energy reserve. More specifically, information on snow cover extent (SCE) and snow water equivalent (SWE) is crucial for hydrological forecasting, particularly in northern regions since the snowmelt provides the water that fills the reservoirs and is subsequently used for hydropower generation. For several years Hydro Quebec's research institute ( IREQ) developed several algorithms to map SCE and SWE. So far all the methods were deterministic. However, given the need to maximize the efficient use of all resources while ensuring reliability, the electrical systems must now be managed taking into account all risks. Since snow cover estimation is based on limited spatial information, it is important to quantify and handle its uncertainty in the hydrological forecasting system. This paper presents the first results of a probabilistic algorithm for mapping SCE by combining Bayesian mixture of probability distributions and multiple logistic regression models applied to passive microwave data. This approach allows assigning for each grid point, probabilities to the set of the mutually exclusive discrete outcomes: "snow" and "no snow". Its performance was evaluated using the Brier score since it is particularly appropriate to

  14. Hidrelétricas no Rio Madeira-RO: tensões sobre o uso do território e dos recursos naturais na Amazônia Hydroélectriques dans la rivière Madeira-RO: les tensions sur l´usage du territoire et des les ressources naturelles d’Amazonie Hydroelectric at the Madeira River: tensions about the territory using and the natural resources in the Amazon

    Directory of Open Access Journals (Sweden)

    Leonardo José Cordeiro Santos

    2012-06-01

    Full Text Available A construção das usinas hidrelétricas (Jirau e Santo Antônio, iniciadas em 2008, no Rio Madeira, município de Porto Velho-RO, confere à parte da Amazônia Sul Ocidental Rondoniense, uma (revalorização diante do contexto nacional e internacional devido ao potencial energético e ainda por compor parte de complexos para circulação e energia Sul-Americana. A materialização da obra incide sobre a intensificação dos conflitos sobre o uso do território e de seus recursos, fato comprovado a partir das análises feitas sobre as escalas de atuação dos atores e as estratégias na utilização dos recursos naturais na área de estudo. Os resultados ratificam que na Amazônia Rondoniense as políticas de infraestrutura estabelecidas são resultantes de interesses externos a região e, quando implantadas, desestruturam a lógica de organização local, elevando as tensões ambientais e sociais.La construction des usines hydroélectriques (Jirau et Santo Antônio, commencée en 2008, sur le Rio Madeira, dans le município Porto Velho-RO, (revalorise la partie d’ Amazonie Sud Occidentale dú Rondônia en raison du potentiel énérfetique qu’elle gènére et son inscription dans le réseau d’alimentation électrique de l’Amérique du Sud. Mais l´rélisation des ouvrages intensifie les conflits d’utilisation du territoire et de ses ressources, comme le conferment les analyses produites par cette recherché sur les échelles d’intervention des acteurs et les estratégies d’utilisation des ressources naturelles dans la zone d’éstude. Les résultats montrent que dans l’Amazonie du Rondônia, les politiques d’infrastructure telles qu’elles sont conçues resultant d’intérêts externes à la région et, lorsqu’wlles sont implantées, déstructurent les logiques d’organisation locale et provoquent des tensions environnementales et sociales.The building of the hydroelectric plants (Jirau and Santo Antônio, which started

  15. Chile ushers in new hydro era

    International Nuclear Information System (INIS)

    Moxon, S.

    1997-01-01

    The planned construction of two hydroelectric power plants at Peuchen and Mampil, will help to meet Chile's growing electricity demand. Securing finance for the project has been straight forward thanks to the optimal hydrological conditions, rivers with a very strong flow providing a large head of water over short distance. Hydropower plays a central role in Chile's generating capacity providing 70% of total energy consumption. Thus, the future of these projects will be highly successful, it is argued. (UK)

  16. Uncertainty analysis of hydro-meteorological forecasts

    OpenAIRE

    Grythe, Karl Kristian; Gao, Yukun

    2010-01-01

    Masteroppgave i informasjons- og kommunikasjonsteknologi 2010 – Universitetet i Agder, Grimstad Meteorological and hydrological forecasts are very important to human’s life which concerns agriculture, industry, transport, etc. The Nordic hydropower industry use and develop hydrological forecasting models to make predictions of rivers steam flow. The quantity of incoming stream flow is important to the electricity production because excessive water in reservoir will cause flood ...

  17. Deconstructing hydro: the BC electricity sector in this decade

    International Nuclear Information System (INIS)

    Jaccard, M.

    2001-01-01

    This paper provided speculation regarding the world-wide trend to deregulate electric utilities with particular focus on power deregulation in British Columbia. The four main issues facing electricity reform in British Columbia are to determine if publicly-owned assets should be privatised, how to achieve competitive electricity commodity prices in a de-regulated generation market, to determine the extent to which customers will be allowed direct access to sellers of electricity, and to determine which changes in industry structure are needed to ensure that control over the common carrier does not hinder fair competition. BC Hydro recently issued a plan for the next decade entitled the Integrated Electricity Plan which suggests that almost all growth in supply on the Hydro system will be limited to a few large projects totalling 900 megawatts, to be owned and operated by either BC Hydro or by the Columbia Power Corporation, another Crown entity. This plan is in complete contrast to the evolution of the electricity industry nearly everywhere else in the world where demand growth is being met almost entirely by small- and medium-scale non-utility resources issuing from competitive markets with minimal public funding. This article looks at why BC Hydro will probably be transformed significantly, even dismantled, in the coming decade. The article begins with a section explaining the cause and effects of major changes in the world-wide electricity industry. This is followed by a section reviewing what BC Hydro did in the 1990s while reform was taking place. The article also describes what BC Hydro intends to do in the next decade and explores reasons why this outcome is unlikely. The final section of the article provides an alternative vision of BC Hydro's future over the next decade. 1 tab., 3 figs

  18. Overview of Hydrometeorologic Forecasting Procedures at BC Hydro

    Science.gov (United States)

    McCollor, D.

    2004-12-01

    Energy utility companies must balance production from limited sources with increasing demand from industrial, business, and residential consumers. The utility planning process requires a balanced, efficient, and effective distribution of energy from source to consumer. Therefore utility planners must consider the impact of weather on energy production and consumption. Hydro-electric companies should be particularly tuned to weather because their source of energy is water, and water supply depends on precipitation. BC Hydro operates as the largest hydro-electric company in western Canada, managing over 30 reservoirs within the province of British Columbia, and generating electricity for 1.6 million people. BC Hydro relies on weather forecasts of watershed precipitation and temperature to drive hydrologic reservoir inflow models and of urban temperatures to meet energy demand requirements. Operations and planning specialists in the company rely on current, value-added weather forecasts for extreme high-inflow events, daily reservoir operations planning, and long-term water resource management. Weather plays a dominant role for BC Hydro financial planners in terms of sensitive economic responses. For example, a two percent change in hydropower generation, due in large part to annual precipitation patterns, results in an annual net change of \\50 million in earnings. A five percent change in temperature produces a \\5 million change in yearly earnings. On a daily basis, significant precipitation events or temperature extremes involve potential profit/loss decisions in the tens of thousands of dollars worth of power generation. These factors are in addition to environmental and societal costs that must be considered equally as part of a triple bottom line reporting structure. BC Hydro water resource managers require improved meteorological information from recent advancements in numerical weather prediction. At BC Hydro, methods of providing meteorological forecast data

  19. Dynamic Floodplain representation in hydrologic flood forecasting using WRF-Hydro modeling framework

    Science.gov (United States)

    Gangodagamage, C.; Li, Z.; Maitaria, K.; Islam, M.; Ito, T.; Dhondia, J.

    2016-12-01

    Floods claim more lives and damage more property than any other category of natural disaster in the Continental United States. A system that can demarcate local flood boundaries dynamically could help flood prone communities prepare for and even prevent from catastrophic flood events. Lateral distance from the centerline of the river to the right and left floodplains for the water levels coming out of the models at each grid location have not been properly integrated with the national hydrography dataset (NHDPlus). The NHDPlus dataset represents the stream network with feature classes such as rivers, tributaries, canals, lakes, ponds, dams, coastlines, and stream gages. The NHDPlus dataset consists of approximately 2.7 million river reaches defining how surface water drains to the ocean. These river reaches have upstream and downstream nodes and basic parameters such as flow direction, drainage area, reach slope etc. We modified an existing algorithm (Gangodagamage et al., 2007) to provide lateral distance from the centerline of the river to the right and left floodplains for the flows simulated by models. Previous work produced floodplain boundaries for static river stages (i.e. 3D metric: distance along the main stem, flow depth, lateral distance from river center line). Our new approach introduces the floodplain boundary for variable water levels at each reach with the fourth dimension, time. We use modeled flows from WRF-Hydro and demarcate the right and left lateral boundaries of inundation dynamically by appropriately mapping discharges into hydraulically corrected stages. Backwater effects from the mainstem to tributaries are considered and proper corrections are applied for the tributary inundations. We obtained river stages by optimizing reach level channel parameters using newly developed stream flow routing algorithm. Non uniform inundations are mapped at each NHDplus reach (upstream and downstream nodes) and spatial interpolation is carried out on a

  20. A new and integrated hydro-economic accounting and analytical framework for water resources: a case study for North China.

    Science.gov (United States)

    Guan, Dabo; Hubacek, Klaus

    2008-09-01

    Water is a critical issue in China for a variety of reasons. China is poor of water resources with 2,300 m(3) of per capita availability, which is less than 13 of the world average. This is exacerbated by regional differences; e.g. North China's water availability is only about 271 m(3) of per capita value, which is only 125 of the world's average. Furthermore, pollution contributes to water scarcity and is a major source for diseases, particularly for the poor. The Ministry of Hydrology [1997. China's Regional Water Bullets. Water Resource and Hydro-power Publishing House, Beijing, China] reports that about 65-80% of rivers in North China no longer support any economic activities. Previous studies have emphasized the amount of water withdrawn but rarely take water quality into consideration. The quality of the return flows usually changes; the water quality being lower than the water flows that entered the production process initially. It is especially important to measure the impacts of wastewater to the hydro-ecosystem. Thus, water consumption should not only account for the amount of water inputs but also the amount of water contaminated in the hydro-ecosystem by the discharged wastewater. In this paper we present a new accounting and analytical approach based on economic input-output modelling combined with a mass balanced hydrological model that links interactions in the economic system with interactions in the hydrological system. We thus follow the tradition of integrated economic-ecologic input-output modelling. Our hydro-economic accounting framework and analysis tool allows tracking water consumption on the input side, water pollution leaving the economic system and water flows passing through the hydrological system thus enabling us to deal with water resources of different qualities. Following this method, the results illustrate that North China requires 96% of its annual available water, including both water inputs for the economy and contaminated

  1. Effects of Scandinavian hydro power on storage needs in a fully renewable European power system for various transmission capacity scenarios

    Science.gov (United States)

    Kies, Alexander; Nag, Kabitri; von Bremen, Lueder; Lorenz, Elke; Heinemann, Detlev

    2015-04-01

    The penetration of renewable energies in the European power system has increased in the last decades (23.5% share of renewables in the gross electricity consumption of the EU-28 in 2012) and is expected to increase further up to very high shares close to 100%. Planning and organizing this European energy transition towards sustainable power sources will be one of the major challenges of the 21st century. It is very likely that in a fully renewable European power system wind and photovoltaics (pv) will contribute the largest shares to the generation mix followed by hydro power. However, feed-in from wind and pv is due to the weather dependant nature of their resources fluctuating and non-controllable. To match generation and consumption several solutions and their combinations were proposed like very high backup-capacities of conventional power generation (e.g. fossile or nuclear), storages or the extension of the transmission grid. Apart from those options hydro power can be used to counterbalance fluctuating wind and pv generation to some extent. In this work we investigate the effects of hydro power from Norway and Sweden on residual storage needs in Europe depending on the overlaying grid scenario. High temporally and spatially resolved weather data with a spatial resolution of 7 x 7 km and a temporal resolution of 1 hour was used to model the feed-in from wind and pv for 34 investigated European countries for the years 2003-2012. Inflow into hydro storages and generation by run-of-river power plants were computed from ERA-Interim reanalysis runoff data at a spatial resolution of 0.75° x 0.75° and a daily temporal resolution. Power flows in a simplified transmission grid connecting the 34 European countries were modelled minimizing dissipation using a DC-flow approximation. Previous work has shown that hydro power, namely in Norway and Sweden, can reduce storage needs in a renewable European power system by a large extent. A 15% share of hydro power in Europe

  2. Graphic user interface for COSMOS code

    International Nuclear Information System (INIS)

    Oh, Je Yong; Koo, Yang Hyun; Lee, Byung Ho; Cheon, Jin Sik; Sohn, Dong Seong

    2003-06-01

    The Graphic User Interface (GUI) - which consisted of graphical elements such as windows, menu, button, icon, and so on - made it possible that the computer could be easily used for common users. Hence, the GUI was introduced to improve the efficiency to input parameters in COSMOS code. The functions to output graphs on the screen and postscript files were also added. And the graph library can be applied to the other codes. The details of principles of GUI and graphic library were described in the report

  3. Practical Implementation of a Graphics Turing Test

    DEFF Research Database (Denmark)

    Borg, Mathias; Johansen, Stine Schmieg; Thomsen, Dennis Lundgaard

    2012-01-01

    We present a practical implementation of a variation of the Turing Test for realistic computer graphics. The test determines whether virtual representations of objects appear as real as genuine objects. Two experiments were conducted wherein a real object and a similar virtual object is presented...... graphics. Based on the results from these experiments, future versions of the Graphics Turing Test could ease the restrictions currently necessary in order to test object telepresence under more general conditions. Furthermore, the test could be used to determine the minimum requirements to achieve object...

  4. Future of motion graphics and particle systems

    OpenAIRE

    Warambo, Bryan

    2012-01-01

    The purpose of this research is to study the use of particle systems in motion graphics, which is known to be the most popular graphics tool for multiple animated elements. It is known to be a procedural animation because as the emitter builds up more particles are formed to create a motion effect. At the same time exploring the future of motion graphics and Particle systems connection and the relevance it has in terms of longevity in being a major post-production element in digital media. Th...

  5. OAP- OFFICE AUTOMATION PILOT GRAPHICS DATABASE SYSTEM

    Science.gov (United States)

    Ackerson, T.

    1994-01-01

    The Office Automation Pilot (OAP) Graphics Database system offers the IBM PC user assistance in producing a wide variety of graphs and charts. OAP uses a convenient database system, called a chartbase, for creating and maintaining data associated with the charts, and twelve different graphics packages are available to the OAP user. Each of the graphics capabilities is accessed in a similar manner. The user chooses creation, revision, or chartbase/slide show maintenance options from an initial menu. The user may then enter or modify data displayed on a graphic chart. The cursor moves through the chart in a "circular" fashion to facilitate data entries and changes. Various "help" functions and on-screen instructions are available to aid the user. The user data is used to generate the graphics portion of the chart. Completed charts may be displayed in monotone or color, printed, plotted, or stored in the chartbase on the IBM PC. Once completed, the charts may be put in a vector format and plotted for color viewgraphs. The twelve graphics capabilities are divided into three groups: Forms, Structured Charts, and Block Diagrams. There are eight Forms available: 1) Bar/Line Charts, 2) Pie Charts, 3) Milestone Charts, 4) Resources Charts, 5) Earned Value Analysis Charts, 6) Progress/Effort Charts, 7) Travel/Training Charts, and 8) Trend Analysis Charts. There are three Structured Charts available: 1) Bullet Charts, 2) Organization Charts, and 3) Work Breakdown Structure (WBS) Charts. The Block Diagram available is an N x N Chart. Each graphics capability supports a chartbase. The OAP graphics database system provides the IBM PC user with an effective means of managing data which is best interpreted as a graphic display. The OAP graphics database system is written in IBM PASCAL 2.0 and assembler for interactive execution on an IBM PC or XT with at least 384K of memory, and a color graphics adapter and monitor. Printed charts require an Epson, IBM, OKIDATA, or HP Laser

  6. The HydroShare Collaborative Repository for the Hydrology Community

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of, and collaboration around, "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting our approach to making this system easy to use and serving the needs of the hydrology community represented by the Consortium of Universities for the Advancement of Hydrologic Sciences, Inc. (CUAHSI). Metadata for uploaded files is harvested automatically or captured using easy to use web user interfaces. Users are encouraged to add or create resources in HydroShare early in the data life cycle. To encourage this we allow users to share and collaborate on HydroShare resources privately among individual users or groups, entering metadata while doing the work. HydroShare also provides enhanced functionality for users through web apps that provide tools and computational capability for actions on resources. HydroShare's architecture broadly is comprised of: (1) resource storage, (2) resource exploration website, and (3) web apps for actions on resources. System components are loosely coupled and interact through APIs, which enhances robustness, as components can be upgraded and advanced relatively independently. The full power of this paradigm is the

  7. Impact of flocculation on flotation tailing's hydro-cycloning properties

    Directory of Open Access Journals (Sweden)

    Knežević Dinko N.

    2014-01-01

    Full Text Available Research results of hydro-cycloning of flocculated and non-flocculated flotation tailing from the lead and zinc open pit mine 'Suplja stijena', Sula - Montenegro have been shown in this paper. Reason for this research was finding conditions in order to separate fraction that is suitable for embankment erection. Flotation tailings has been tested in the very state that it goes out from the flotation process and tailings which is flocculated by anionic flocculant. The object was to determine the impact of flocculation on properties of hydro-cycloning products and disposal process. In hydro-cycloning process greater underflow mass is being separated with non-flocculated tailing. Values of geomechanical parameters are significantly different, especially hydro-cyclone's underflow. All geomechanical parameters of hydro-cyclone's underflow are suitable for erecting embankment which shall be made from non-flocculated tailing. Underflow drainage of non-flocculated tailing is faster while overflow drainage is slower and problematic with both tailings.

  8. Canadian hydro potential in the North American market

    International Nuclear Information System (INIS)

    Adams, K.

    2002-01-01

    Canada's hydro potential in the North American energy market was discussed. Canada is a net exporter of electricity in North America, and since 1990, has exported an average of 28 Terawatt hours/year to the United States. More than 65 per cent of these exports were generated from hydro power plants. It was emphasized that significant reductions in greenhouse gases can be achieved if Canadian hydroelectricity is substituted for coal power generation. It was also noted that although there may not be enough hydro capacity to meet all of North America's energy requirements, development of new large hydro resources in Canada could help meet the growing demand for electricity in the United States. Hydro can also complement other renewable energy sources such as wind and solar. The factors that will determine if Canadian hydropower will contribute to the energy demand are market mechanisms such as greenhouse gas credit trading systems which provide incentive for renewable energy projects. In addition, the existing infrastructure must be expanded both east and west within Canada and north and south between Canada and the United States. 5 figs

  9. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  10. Group Design Problems in Engineering Design Graphics.

    Science.gov (United States)

    Kelley, David

    2001-01-01

    Describes group design techniques used within the engineering design graphics sequence at Western Washington University. Engineering and design philosophies such as concurrent engineering place an emphasis on group collaboration for the solving of design problems. (Author/DDR)

  11. The Visual Communication or Graphic Communication Dilemma

    Science.gov (United States)

    Fecik, John T.

    1975-01-01

    The author reviews the history of communication and communications technology, considers differences between "visual communication" and "graphic communication," and comments on "seeds of revolution" in the industry. He offers four components of an educational structure or organization titled "graphic…

  12. Heuristic attacks against graphical password generators

    CSIR Research Space (South Africa)

    Peach, S

    2010-05-01

    Full Text Available In this paper the authors explore heuristic attacks against graphical password generators. A new trend is emerging to use user clickable pictures to generate passwords. This technique of authentication can be successfully used for - for example...

  13. Toolkit Design for Interactive Structured Graphics

    National Research Council Canada - National Science Library

    Bederson, Benjamin B; Grosjean, Jesse; Meyer, Jon

    2003-01-01

    .... We describe Jazz (a polylithic toolkit) and Piccolo (a monolithic toolkit), each of which we built to support interactive 2D structured graphics applications in general, and Zoomable User Interface applications in particular...

  14. Graphical modelling software in R - status

    DEFF Research Database (Denmark)

    Detlefsen, Claus; Højsgaard, Søren; Lauritzen, Steffen L

    2007-01-01

    Graphical models in their modern form have been around for nearly a quarter of a century.  Various computer programs for inference in graphical models have been developed over that period. Some examples of free software programs are BUGS (Thomas 1994), CoCo (Badsberg2001), Digram (Klein, Keiding......, and Kreiner 1995), MIM (Edwards  2000), and Tetrad (Glymour, Scheines, Spirtes, and Kelley 1987). The gR initiative (Lauritzen 2002) aims at making graphical models available in R (R Development Core Team 2006). A small grant from the Danish Science Foundation supported this initiative. We will summarize...... the results of the initiative so far. Specifically we will illustrate some of the R packages for graphical modelling currently on CRAN and discuss their strengths and weaknesses....

  15. Graphic Designer/Production Coordinator | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Provides design and graphic services for print- and Web-based publishing;; Initiates designs and carries out ... process, ensuring that such suppliers meet appropriate standards of quality and service at reasonable cost; ... Internal Services.

  16. Full Plant STWAVE: SMS Graphical Interface

    National Research Council Canada - National Science Library

    McKee Smith, Jane; Zundel, Alan

    2006-01-01

    The purpose of this Coastal and Hydraulics Engineering Technical Note (CHETN) is to describe the graphical interface for the full-plane version of the wave model STWAVE (Smith et al. 2001; Smith 2001...

  17. DDP-516 Computer Graphics System Capabilities

    Science.gov (United States)

    1972-06-01

    This report describes the capabilities of the DDP-516 Computer Graphics System. One objective of this report is to acquaint DOT management and project planners with the system's current capabilities, applications hardware and software. The Appendix i...

  18. Graphical passwords: a qualitative study of password patterns

    CSIR Research Space (South Africa)

    Vorster, J

    2015-03-01

    Full Text Available Graphical passwords schemas are becoming more main-stream. There are many different approaches to graphical passwords, each with its own drawbacks and advantages. There has been many studies to suggest that graphical passwords should be stronger...

  19. History And Importance Of Graphic Design

    OpenAIRE

    Lyallya, Kirill

    2016-01-01

    This thesis is about history and importance of graphic design in different periods, from ancient times until today. The features inherent in different countries are considered. The techniques, basic methods for creating projects and computer software that designers have used are mentioned. In order to understand the importance of graphic design in our lives, it is considered from the side of ordinary people, how it manifests itself in daily lives and how it affects business. The thesis provid...

  20. Rough surface scattering simulations using graphics cards

    International Nuclear Information System (INIS)

    Klapetek, Petr; Valtr, Miroslav; Poruba, Ales; Necas, David; Ohlidal, Miloslav

    2010-01-01

    In this article we present results of rough surface scattering calculations using a graphical processing unit implementation of the Finite Difference in Time Domain algorithm. Numerical results are compared to real measurements and computational performance is compared to computer processor implementation of the same algorithm. As a basis for computations, atomic force microscope measurements of surface morphology are used. It is shown that the graphical processing unit capabilities can be used to speedup presented computationally demanding algorithms without loss of precision.