WorldWideScience

Sample records for risk management practitioners

  1. Information risk management a practitioner's guide

    CERN Document Server

    Sutton, David

    2014-01-01

    Information risk management (IRM) is about identifying, assessing and prioritising risks to keep information secure and available. This accessible book provides practical guidance to the principles and development of a strategic approach to an IRM programme. The only textbook for the BCS Practitioner Certificate in Information Risk Management.

  2. Risk management is every managers’ responsibility: Are HR practitioners ready for the challenge

    Directory of Open Access Journals (Sweden)

    Pascal Siphelele Zulu

    2014-07-01

    Full Text Available Risk and Enterprise Risk Management has become a strategic imperative in most organisations and government departments over the years. Most company boards and government entities in South Africa have adopted various corporate governance frameworks as a mechanism to direct and control the operations of their organisations. As a result, risk management and enterprise risk management has become every manager’s responsibility. The key question that the study investigates is whether HR managers are aware of this strategic imperative and ready to be risk champions in their environment. Data was collected from forty eight (48 HR Managers and Practitioners from private companies and sixty eight (68 HR Managers and Practitioners from government departments and government companies in Durban, Kwazulu-Natal and Cape Town, Western Cape using both personal interviews and questionnaires which were distributed to one hundred and fifty (150 employees, of which one hundred and sixteen (116 questionnaires were completed (return rate 77.3%. The results of this paper indicate that, in general and across all sectors, HR practitioners’ levels of understanding of corporate governance and risk management is limited

  3. Continuing Professional Education of Insurance and Risk Management Practitioners: A Comparative Case Study of Customer Service Representatives, Insurance Agents and Risk Managers

    Science.gov (United States)

    Krauss, George E.

    2009-01-01

    The purpose of this study is to understand how selected insurance practitioners learn and developed in their practices setting. The selected insurance practitioners (collectively customer service representatives, insurance agents, and risk managers) are responsible for the counseling and placement of insurance products and the implementation of…

  4. Enterprise risk management implementation : perceptions of risk practitioners in the South African mining industry

    OpenAIRE

    2013-01-01

    M.Comm. (Financial Economics) Enterprise risk management (ERM) is emerging as a risk management methodology that is seemingly superior to that of traditional, silo-based risk management. Although ERM implementation is on the increase, research into ERM is still limited. There is, for instance, a lack of clarity within the literature regarding which factors lead to companies embracing ERM, as well as a lack of consensus on ERM’s benefits. The purpose of this study was therefore to explore t...

  5. Characterizing the High-Risk Homebound Patients in Need of Nurse Practitioner Co-Management

    Science.gov (United States)

    Jones, Masha G.; Ornstein, Katherine A.; Skovran, David M.; Soriano, Theresa A.; DeCherrie, Linda V.

    2016-01-01

    By providing more frequent provider visits, prompt responses to acute issues, and care coordination, nurse practitioner (NP) co-management has been beneficial for the care of chronically ill older adults. This paper describes the homebound patients with high symptom burden and healthcare utilization who were referred to an NP co-management intervention and outlines key features of the intervention. We compared demographic, clinical, and healthcare utilization data of patients referred for NP co-management within a large home-based primary care (HBPC) program (n=87) to patients in the HBPC program not referred for co-management (n=1027). A physician survey found recurrent hospitalizations to be the top reason for co-management referral and a focus group with nurses and social workers noted that co-management patients are typically those with active medical issues more so than psychosocial needs. Co-management patients are younger than non-co-management patients (72.31 vs. 80.30 years old, P<0.001), with a higher mean Charlson comorbidity score (3.53 vs. 2.47, P=0.0001). They have higher baseline annual hospitalization rates (2.27 vs. 0.61, P=0.0005) and total annual home visit rates (13.1 vs. 6.60, P=0.0001). NP co-management can be utilized in HBPC to provide intensive medical management to high-risk homebound patients. PMID:27876403

  6. Review of guidance on recurrence risk management for general practitioners in breast cancer, colorectal cancer and melanoma guidelines.

    NARCIS (Netherlands)

    Spronk, I.; Korevaar, J.C.; Burgers, J.S.; Albreht, T.; Schellevis, F.G.

    2017-01-01

    Background. General practitioners (GPs) will face cancer recurrences more frequently due to the rising number of cancer survivors and greater involvement of GPs in the follow-up care. Currently, GPs are uncertain about managing recurrence risks and may need more guidance. Objective. To explore what

  7. Risk perception for paragliding practitioners.

    OpenAIRE

    Paixão, Jairo Antônio da; Tucher, Guilherme

    2012-01-01

    As an adventure sport, paragliding exposes participants to different levels of life risk. However, the boundary between calculated risk and real risk is a subtle one, depending on the practitioner’s perception. Thus, this study aimed to analyze risk perception of 73 paragliding practitioners. The descriptive-exploratory study method was used. Data was col-lected via a questionnaire validated according to the Delphi technique. Variables were evaluated from a bipolar Likert type scale, ranging ...

  8. Hospital management. The reflective practitioner.

    Science.gov (United States)

    Campbell, I

    Ian Campbell's paper, originally delivered at a conference on the development of 'The reflective practitioner' while he was Unit General Manager of Sunderland Royal Infirmary, describes the liaison between general and nurse managers in the hospital. Management must give a hospital organisation direction and must set the parameters of corporate and individual performance, but it must also be responsive to the feedback received from practising clinicians. The key concept is quality of service, and in this managers and practitioners can work together towards a common goal.

  9. Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition)

    Science.gov (United States)

    Stamatelatos,Michael; Dezfuli, Homayoon; Apostolakis, George; Everline, Chester; Guarro, Sergio; Mathias, Donovan; Mosleh, Ali; Paulos, Todd; Riha, David; Smith, Curtis; hide

    2011-01-01

    Probabilistic Risk Assessment (PRA) is a comprehensive, structured, and logical analysis method aimed at identifying and assessing risks in complex technological systems for the purpose of cost-effectively improving their safety and performance. NASA's objective is to better understand and effectively manage risk, and thus more effectively ensure mission and programmatic success, and to achieve and maintain high safety standards at NASA. NASA intends to use risk assessment in its programs and projects to support optimal management decision making for the improvement of safety and program performance. In addition to using quantitative/probabilistic risk assessment to improve safety and enhance the safety decision process, NASA has incorporated quantitative risk assessment into its system safety assessment process, which until now has relied primarily on a qualitative representation of risk. Also, NASA has recently adopted the Risk-Informed Decision Making (RIDM) process [1-1] as a valuable addition to supplement existing deterministic and experience-based engineering methods and tools. Over the years, NASA has been a leader in most of the technologies it has employed in its programs. One would think that PRA should be no exception. In fact, it would be natural for NASA to be a leader in PRA because, as a technology pioneer, NASA uses risk assessment and management implicitly or explicitly on a daily basis. NASA has probabilistic safety requirements (thresholds and goals) for crew transportation system missions to the International Space Station (ISS) [1-2]. NASA intends to have probabilistic requirements for any new human spaceflight transportation system acquisition. Methods to perform risk and reliability assessment in the early 1960s originated in U.S. aerospace and missile programs. Fault tree analysis (FTA) is an example. It would have been a reasonable extrapolation to expect that NASA would also become the world leader in the application of PRA. That was

  10. Responding to climate risks in South Florida: New tools for adaptive water management collaboration between researchers and practitioners.

    Science.gov (United States)

    Treuer, G.

    2017-12-01

    South Florida's vulnerability to sea level rise has brought attention and research funding to the region. Scientists have demonstrated that existing flood control, water supply, and water quality challenges will be made more difficult by sea level rise. Investing in adaptation and efficiency can help reduce the region's exposure to climate change threats. However, local governments and agencies struggle to act. Suggestions for further collaboration between practitioners and researchers are presented, drawing from the results of research on homeowner risk perception, water supply management, and sea level rise adaptive stormwater investments in the Miami area. Choice Flow, an online platform for creating immersive simulations that track decision making and information gathering, was used to help 348 South Florida homeowners experience 35 years (18 inches) of sea level rise in 20 minutes. It found that there is a window of opportunity for local governments to act. Over 70% of homeowners were willing to support higher taxes to pay for adaptation investments now and in the future. And while most were not worried enough about sea level rise now they became increasingly willing to move out of the region as sea levels rose. Simulations like this could enable cities like Miami Beach pre-test new technologies and policies, e.g. new building standards or stormwater technology, which help reduce flood risk but often inspire opposition from stakeholders who perceive them as a threat. Additionally, academic researchers can collaborate with practitioners to understand how policy transitions, necessary for adaptive water management, occur over time and across jurisdictions. A data-narrative of the recent shift towards sustainable water supply in Miami-Dade County, developed in consultation with utility staff, is presented as an example. It provides a basis for comparison with other communities and a tool for entrepreneurial practitioners to advocate for conservation as a means of

  11. Arctic Risk Management (ARMNet) Network: Linking Risk Management Practitioners and Researchers Across the Arctic Regions of Canada and Alaska To Improve Risk, Emergency and Disaster Preparedness and Mitigation Through Comparative Analysis and Applied Research

    Science.gov (United States)

    Garland, A.

    2015-12-01

    The Arctic Risk Management Network (ARMNet) was conceived as a trans-disciplinary hub to encourage and facilitate greater cooperation, communication and exchange among American and Canadian academics and practitioners actively engaged in the research, management and mitigation of risks, emergencies and disasters in the Arctic regions. Its aim is to assist regional decision-makers through the sharing of applied research and best practices and to support greater inter-operability and bilateral collaboration through improved networking, joint exercises, workshops, teleconferences, radio programs, and virtual communications (eg. webinars). Most importantly, ARMNet is a clearinghouse for all information related to the management of the frequent hazards of Arctic climate and geography in North America, including new and emerging challenges arising from climate change, increased maritime polar traffic and expanding economic development in the region. ARMNet is an outcome of the Arctic Observing Network (AON) for Long Term Observations, Governance, and Management Discussions, www.arcus.org/search-program. The AON goals continue with CRIOS (www.ariesnonprofit.com/ARIESprojects.php) and coastal erosion research (www.ariesnonprofit.com/webinarCoastalErosion.php) led by the North Slope Borough Risk Management Office with assistance from ARIES (Applied Research in Environmental Sciences Nonprofit, Inc.). The constituency for ARMNet will include all northern academics and researchers, Arctic-based corporations, First Responders (FRs), Emergency Management Offices (EMOs) and Risk Management Offices (RMOs), military, Coast Guard, northern police forces, Search and Rescue (SAR) associations, boroughs, territories and communities throughout the Arctic. This presentation will be of interest to all those engaged in Arctic affairs, describe the genesis of ARMNet and present the results of stakeholder meetings and webinars designed to guide the next stages of the Project.

  12. Investigating patients' and general practitioners' views of computerised decision support software for the assessment and management of cardiovascular risk

    Directory of Open Access Journals (Sweden)

    Anne Wilson

    2007-01-01

    Conclusion Computer decision support programs are becoming more prevalent, but little is known about their usability and acceptability to both health professionals and consumers. The complexities of cardiovascular risk assessment and management can be adequately managed with such programs. As a contemporary report this study contributes to the growing knowledge required for developers of medical software and decision support systems to better understand the needs of endusers.

  13. Practitioner Perspectives on a Disaster Management Architecture

    Science.gov (United States)

    Moe, K.; Evans, J. D.

    2012-12-01

    The Committee on Earth Observing Satellites (CEOS) Working Group on Information Systems and Services (WGISS) is constructing a high-level reference model for the use of satellites, sensors, models, and associated data products from many different global data and service providers in disaster response and risk assessment. To help streamline broad, effective access to satellite information, the reference model provides structured, shared, holistic views of distributed systems and services - in effect, a common vocabulary describing the system-of-systems building blocks and how they are composed for disaster management. These views are being inferred from real-world experience, by documenting and analyzing how practitioners have gone about using or providing satellite data to manage real disaster events or to assess or mitigate hazard risks. Crucial findings and insights come from case studies of three kinds of experience: - Disaster response and recovery (such as the 2008 Sichuan/Wenchuan earthquake in China; and the 2011 Tohoku earthquake and tsunami in Japan); - Technology pilot projects (such as NASA's Flood Sensor Web pilot in Namibia, or the interagency Virtual Mission Operation Center); - Information brokers (such as the International Charter: Space and Major Disasters, or the U.K.-based Disaster Management Constellation). Each of these experiences sheds light on the scope and stakeholders of disaster management; the information requirements for various disaster types and phases; and the services needed for effective access to information by a variety of users. They also highlight needs and gaps in the supply of satellite information for disaster management. One need stands out: rapid and effective access to complex data from multiple sources, across inter-organizational boundaries. This is the near-real-time challenge writ large: gaining access to satellite data resources from multiple organizationally distant and geographically disperse sources, to meet an

  14. Migration goals and risk management in cloud computing: A review of state of the art and survey results on practitioners

    OpenAIRE

    Islam, Shareeful; Fenz, Stefan; Weippl, Edgar; Kalloniatis, Christos

    2016-01-01

    Organizations are now seriously considering adopting cloud into the existing business context, but migrating\\ud data, application and services into cloud doesn’t come without substantial risks. These risks are the significant\\ud barriers for the wider cloud adoption. Cloud computing has obtained a lot of attention by both research and\\ud industry communities in recent years. There are works that consolidate the existing work on cloud migration\\ud and technology. However, there is no secondary...

  15. Understanding factors that influence the use of risk scoring instruments in the management of patients with unstable angina or non-ST-elevation myocardial infarction in the Netherlands: a qualitative study of health care practitioners' perceptions.

    Science.gov (United States)

    Engel, Josien; Heeren, Marie-Julie; van der Wulp, Ineke; de Bruijne, Martine C; Wagner, Cordula

    2014-09-22

    . Practitioners who were forced to use cardiac risk scores were less likely to take into account the risk score in their treatment decisions. The results of this study can be used to develop strategies that stimulate or sustain cardiac risk score use in practice, while taking into account barriers that affect cardiac risk score use, and possibly reduce practice variation in the management of unstable angina and non-ST-elevation myocardial infarction patients.

  16. Risk management

    OpenAIRE

    Mcmanus, John

    2009-01-01

    Few projects are completed on time, on budget, and to their original requirement or specifications. Focusing on what project managers need to know about risk in the pursuit of delivering projects, Risk Management covers key components of the risk management process and the software development process, as well as best practices for risk identification, risk planning, and risk analysis. The book examines risk planning, risk analysis responses to risk, the tracking and modelling of risks, intel...

  17. Agile risk management

    CERN Document Server

    Moran, Alan

    2014-01-01

    This work is the definitive guide for IT managers and agile practitioners. It elucidates the principles of agile risk management and how these relate to individual projects. Explained in clear and concise terms, this synthesis of project risk management and agile techniques is illustrated using the major methodologies such as XP, Scrum and DSDM.Although the agile community frequently cites risk management, research suggests that risk is often narrowly defined and, at best, implicitly treated, which in turn leads to an inability to make informed decisions concerning risk and reward and a poor u

  18. Effective stakeholder management for medical practitioners

    Directory of Open Access Journals (Sweden)

    E Zigiriadis

    2014-01-01

    Full Text Available The importance of organizational-stakeholder relationships is highlighted in most organizational studies literature. This article investigates the relationship between medical practices and their stakeholders and has been developed to provide guidance on stakeholder engagement and communication. It is intended to provide a useful reference point for all medical practices concerning stakeholder engagement activities. Direction is provided on how to identify and ultimately engage with stakeholders. It should hopefully further develop the effectiveness of engagement efforts that are undertaken between a medical practice and its stakeholders. The ability of a medical practice to cultivate and sustain strong relationships with its prominent stakeholder groups greatly enhances the likelihood that the relationship will endure. Medical practitioners in South Africa are generally in urgent need of pursuing new ways of delivering quality health care through developing new service models that have been developed with the help of relevant stakeholders. Since stakeholder relationship management is critical for corporate sustainability, medical practice management should seek strategic direction by investigating the relative competitive threat and relative supportive value of each stakeholder and then classify them accordingly.

  19. Management of arterial hypertension in Cotonou city, Benin: general practitioners' knowledge, attitudes and practice.

    Science.gov (United States)

    Houenassi, Martin Dèdonougbo; Codjo, Léopold Houétondji; Dokoui, David; Dohou, Serge Hugues Mahougnon; Wanvoegbe, Armand; Agbodande, Anthelme; Attinsounon, Angelo Cossi; Alassani, Adebayo; Ahoui, Séraphin; Dovonou, Albert Comlan; Adoukonou, Thierry Armel

    2016-08-23

    We aimed to assess the management of hypertensive patients by general practitioners in Cotonou city. This was a cross-sectional study based on a multicentre survey conducted from 1 May to 31 July 2011. We recruited all consenting general practitioners who worked in public and private centres in Cotonou city. We used the 7th report of the Joint National Committee to assess the management of hypertension by general practitioners. A tested and validated self-questionnaire was used to collect the data on hypertension management by general practitioners. In eight centres that approved the study, 41 general practitioners were included. The definition of hypertension was known by 20 (48.8%) practitioners. Only 25 (61.0%) could describe the conditions for blood pressure measurement. Ten of them were unable to list half of the minimum recommended tests for hypertension, and the majority (92.7%) did not have any idea of global cardiovascular risk. The blood pressure goal was known by only 18 (43.9%) practitioners. Lifestyle (82.9%) and monotherapy (70.7%) were the therapeutic modalities most prescribed. Antihypertensive agents commonly used by practitioners were calcium channel blockers (82.9%), angiotensin converting enzyme inhibitors (53.7%) and diuretics (36.6%). The general practitioners referred their patients to cardiologists mainly for uncontrolled hypertension (63.4%) and the onset of acute complications (56.1%). The general practitioners' knowledge of hypertension was insufficient and their management did not reflect international guidelines.

  20. Establishing a community of practice of researchers, practitioners, policy-makers and communities to sustainably manage environmental health risks in Ecuador.

    Science.gov (United States)

    Spiegel, Jerry M; Breilh, Jaime; Beltran, Efrain; Parra, Jorge; Solis, Fernanda; Yassi, Annalee; Rojas, Alejandro; Orrego, Elena; Henry, Bonnie; Bowie, William R; Pearce, Laurie; Gaibor, Juan; Velasquez, Patricio; Concepcion, Miriam; Parkes, Margot

    2011-11-08

    The Sustainably Managing Environmental Health Risk in Ecuador project was launched in 2004 as a partnership linking a large Canadian university with leading Cuban and Mexican institutes to strengthen the capacities of four Ecuadorian universities for leading community-based learning and research in areas as diverse as pesticide poisoning, dengue control, water and sanitation, and disaster preparedness. In implementing curriculum and complementary innovations through application of an ecosystem approach to health, our interdisciplinary international team focused on the question: "Can strengthening of institutional capacities to support a community of practice of researchers, practitioners, policy-makers and communities produce positive health outcomes and improved capacities to sustainably translate knowledge?" To assess progress in achieving desired outcomes, we review results associated with the logic framework analysis used to guide the project, focusing on how a community of practice network has strengthened implementation, including follow-up tracking of program trainees and presentation of two specific case studies. By 2009, train-the-trainer project initiation involved 27 participatory action research Master's theses in 15 communities where 1200 community learners participated in the implementation of associated interventions. This led to establishment of innovative Ecuadorian-led master's and doctoral programs, and a Population Health Observatory on Collective Health, Environment and Society for the Andean region based at the Universidad Andina Simon Bolivar. Building on this network, numerous initiatives were begun, such as an internationally funded research project to strengthen dengue control in the coastal community of Machala, and establishment of a local community eco-health centre focusing on determinants of health near Cuenca. Strengthening capabilities for producing and applying knowledge through direct engagement with affected populations and

  1. Establishing a community of practice of researchers, practitioners, policy-makers and communities to sustainably manage environmental health risks in Ecuador

    Directory of Open Access Journals (Sweden)

    Henry Bonnie

    2011-11-01

    Full Text Available Abstract Background The Sustainably Managing Environmental Health Risk in Ecuador project was launched in 2004 as a partnership linking a large Canadian university with leading Cuban and Mexican institutes to strengthen the capacities of four Ecuadorian universities for leading community-based learning and research in areas as diverse as pesticide poisoning, dengue control, water and sanitation, and disaster preparedness. Methods In implementing curriculum and complementary innovations through application of an ecosystem approach to health, our interdisciplinary international team focused on the question: “Can strengthening of institutional capacities to support a community of practice of researchers, practitioners, policy-makers and communities produce positive health outcomes and improved capacities to sustainably translate knowledge?” To assess progress in achieving desired outcomes, we review results associated with the logic framework analysis used to guide the project, focusing on how a community of practice network has strengthened implementation, including follow-up tracking of program trainees and presentation of two specific case studies. Results By 2009, train-the-trainer project initiation involved 27 participatory action research Master’s theses in 15 communities where 1200 community learners participated in the implementation of associated interventions. This led to establishment of innovative Ecuadorian-led master’s and doctoral programs, and a Population Health Observatory on Collective Health, Environment and Society for the Andean region based at the Universidad Andina Simon Bolivar. Building on this network, numerous initiatives were begun, such as an internationally funded research project to strengthen dengue control in the coastal community of Machala, and establishment of a local community eco-health centre focusing on determinants of health near Cuenca. Discussion Strengthening capabilities for producing and

  2. Risk management.

    Science.gov (United States)

    Chambers, David W

    2010-01-01

    Every plan contains risk. To proceed without planning some means of managing that risk is to court failure. The basic logic of risk is explained. It consists in identifying a threshold where some corrective action is necessary, the probability of exceeding that threshold, and the attendant cost should the undesired outcome occur. This is the probable cost of failure. Various risk categories in dentistry are identified, including lack of liquidity; poor quality; equipment or procedure failures; employee slips; competitive environments; new regulations; unreliable suppliers, partners, and patients; and threats to one's reputation. It is prudent to make investments in risk management to the extent that the cost of managing the risk is less than the probable loss due to risk failure and when risk management strategies can be matched to type of risk. Four risk management strategies are discussed: insurance, reducing the probability of failure, reducing the costs of failure, and learning. A risk management accounting of the financial meltdown of October 2008 is provided.

  3. A framework for understanding risk perception, explored from the perspective of the water practitioner.

    Science.gov (United States)

    Dobbie, Meredith Frances; Brown, Rebekah Ruth

    2014-02-01

    Sustainable urban water systems are likely to be hybrids of centralized and decentralized infrastructure, managed as an integrated system in water-sensitive cities. The technology for many of these systems is available. However, social and institutional barriers, which can be understood as deeply embedded risk perceptions, have impeded their implementation. Risk perceptions within the water sector are often unrecognized or unacknowledged, despite their role in risk management generally in informing value judgments and specifically in ranking risks to achieve management objectives. There has been very little examination of the role of these risk perceptions in advancing more sustainable water supply management through the adoption of alternative sources. To address this gap, this article presents a framework that can be used as a tool for understanding risk perceptions. The framework is built on the relational theory of risk and presents the range of human phenomena that might influence the perception of an "object at risk" in relation to a "risk object." It has been synthesized from a critical review of theoretical, conceptual, and empirical studies of perception broadly and risk perception specifically, and interpreted in relation to water practitioners. For a water practitioner, the risk object might be an alternative water system, a component, a process, or a technology, and the object at risk could be public or environmental health, profitability, or professional reputation. This framework has two important functions: to allow practitioners to understand their own and others' risk perceptions, which might differ, and to inform further empirical research. © 2013 Society for Risk Analysis.

  4. Nurse practitioner integration: Qualitative experiences of the change management process.

    Science.gov (United States)

    Lowe, Grainne; Plummer, Virginia; Boyd, Leanne

    2018-04-30

    The aim of this qualitative research was to explore perceptions of organisational change related to the integration of nurse practitioners from key nursing stakeholders. The ongoing delivery of effective and efficient patient services is reliant upon the development and sustainability of nurse practitioner roles. Examination of the factors contributing to the underutilization of nurse practitioner roles is crucial to inform future management policies. A change management theory is used to reveal the complexity involved. Qualitative interviews were undertaken using a purposive sampling strategy of key stakeholders. Thematic analysis was undertaken and key themes were correlated to the theoretical framework. The results confirm the benefits of nurse practitioner roles, but suggest organisational structures and embedded professional cultures present barriers to full role optimization. Complicated policy processes are creating barriers to the integration of nurse practitioner roles. The findings increase understanding of the links between strategic planning, human resource management, professional and organisational cultures, governance and politics in change management. Effective leadership drives the change process through the ability to align key components necessary for success. Sustainability of nurse practitioners relies on recognition of their full potential in the health care team. The results of this study highlight the importance of management and leadership in the promotion of advanced nursing skills and experience to better meet patient outcomes. The findings reinforce the potential of nurse practitioners to deliver patient centred, timely and efficient health care. © 2018 John Wiley & Sons Ltd.

  5. The effect of scientific evidence on conservation practitioners' management decisions.

    Science.gov (United States)

    Walsh, Jessica C; Dicks, Lynn V; Sutherland, William J

    2015-02-01

    A major justification of environmental management research is that it helps practitioners, yet previous studies show it is rarely used to inform their decisions. We tested whether conservation practitioners focusing on bird management were willing to use a synopsis of relevant scientific literature to inform their management decisions. This allowed us to examine whether the limited use of scientific information in management is due to a lack of access to the scientific literature or whether it is because practitioners are either not interested or unable to incorporate the research into their decisions. In on-line surveys, we asked 92 conservation managers, predominantly from Australia, New Zealand, and the United Kingdom, to provide opinions on 28 management techniques that could be applied to reduce predation on birds. We asked their opinions before and after giving them a summary of the literature about the interventions' effectiveness. We scored the overall effectiveness and certainty of evidence for each intervention through an expert elicitation process-the Delphi method. We used the effectiveness scores to assess the practitioners' level of understanding and awareness of the literature. On average, each survey participant changed their likelihood of using 45.7% of the interventions after reading the synopsis of the evidence. They were more likely to implement effective interventions and avoid ineffective actions, suggesting that their intended future management strategies may be more successful than current practice. More experienced practitioners were less likely to change their management practices than those with less experience, even though they were not more aware of the existing scientific information than less experienced practitioners. The practitioners' willingness to change their management choices when provided with summarized scientific evidence suggests that improved accessibility to scientific information would benefit conservation management

  6. Practitioner review: schizophrenia spectrum disorders and the at-risk mental state for psychosis in children and adolescents--evidence-based management approaches.

    Science.gov (United States)

    Tiffin, Paul A; Welsh, Patrick

    2013-11-01

    Schizophrenia spectrum disorders are severe mental illnesses which often result in significant distress and disability. Attempts have been made to prospectively identify and treat young people viewed as at high risk of impending nonaffective psychosis. Once a schizophrenia spectrum disorder has developed, prompt identification and management is required. This article reviews the literature relating to the assessment and management of 'at-risk mental states' (ARMS) and the treatment of schizophrenia spectrum disorders in children and adolescents. A systematic search of the literature was undertaken using EMBASE, MEDLINE, PsycINFO databases for the period January 1970-December 2012. Evidence suggests that young people fulfilling the ARMS criteria are at high risk of adverse mental health outcomes but that the majority do not develop nonaffective psychosis over the medium term. Although clinical trial findings have been inconsistent, psychosocial approaches, such as cognitive behaviour therapy, may reduce the risk of transition to psychosis and improve some symptoms, at least over the short term. The effectiveness of psychotropic medication for the ARMS is uncertain although there is accumulating evidence for potential adverse effects of antipsychotic medication, even at low dose, in this population. For the schizophrenias, clinical trial findings suggest that, as in adults, antipsychotics should be selected on the basis of side-effect profile although clozapine may be helpful in treatment refractory illness. There are almost no studies of psychosocial treatments for schizophrenia in young people under 18, and some caution must be exercised when extrapolating the findings of adult studies to younger individuals. A stepped care approach to the ARMS in young people represents a plausible potential management approach for those at high risk of serious mental health problems. However, predictive models currently lack precision and should focus on accurately identifying

  7. The Management of Luxury : A Practitioner's Handbook

    OpenAIRE

    2014-01-01

    The meaning of luxury and the customers that buy luxury have continually been evolving and the luxury sector is today healthier than ever. However luxury companies have had to completely rethink their strategies and rely on state-of-the-art marketing and management tools to help them keep up with consumers' shifting expectations. The Management of Luxury presents the view of 51 international experts on what luxury management is, how to manage luxury organizations, and key strategies for ...

  8. The Management of Infertility | Jimoh | Nigerian Medical Practitioner

    African Journals Online (AJOL)

    A clinical approach to the management of infertility in Africa is discussed. The role of Assisted Reproductive Techniques (ART), adoption and cloning in management of infertility in Africa is discussed. Key Words: Local Tetanus, Recurrence Piercing Injury, Foreign Objects Nigerian Medical Practitioner Vol. 46 No 1, 2004 ...

  9. Taking a Risk to Develop Reflective Skills in Business Practitioners

    Science.gov (United States)

    Mackay, Margaret; Tymon, Alex

    2016-01-01

    Critical reflection can support alternative decision-making in business practice. This paper examines the effectiveness of a risk-based pedagogy to engage practitioners in reflective thinking. Educators adopting a radical pedagogy in professionally accredited programmes face multiple challenges: learners often resist the process of self-reflection…

  10. Passengers, Participants, Partners and Practitioners. Working with Risk To Empower Groups.

    Science.gov (United States)

    Brown, Heather

    2000-01-01

    Participant responsibility in outdoor education programs is placed on a continuum from passenger status through participant and partner to practitioner. Corresponding leader roles are directive, coaching, supporting, and delegating. The disempowering effects of the passenger approach to risk management and the value of teaching a group to manage…

  11. Practitioner Perceptions of Adaptive Management Implementation in the United States

    Directory of Open Access Journals (Sweden)

    Melinda Harm. Benson

    2013-09-01

    Full Text Available Adaptive management is a growing trend within environment and natural resource management efforts in the United States. While many proponents of adaptive management emphasize the need for collaborative, iterative governance processes to facilitate adaptive management, legal scholars note that current legal requirements and processes in the United States often make it difficult to provide the necessary institutional support and flexibility for successful adaptive management implementation. Our research explores this potential disconnect between adaptive management theory and practice by interviewing practitioners in the field. We conducted a survey of individuals associated with the Collaborative Adaptive Management Network (CAMNet, a nongovernmental organization that promotes adaptive management and facilitates in its implementation. The survey was sent via email to the 144 participants who attended CAMNet Rendezvous during 2007-2011 and yielded 48 responses. We found that practitioners do feel hampered by legal and institutional constraints: > 70% of respondents not only believed that constraints exist, they could specifically name one or more examples of a legal constraint on their work implementing adaptive management. At the same time, we found that practitioners are generally optimistic about the potential for institutional reform.

  12. Occupational sitting: practitioner perceptions of health risks, intervention strategies and influences.

    Science.gov (United States)

    Gilson, Nicholas; Straker, Leon; Parry, Sharon

    2012-12-01

    Workplace practitioners are well placed to provide practical insights on sedentary behaviour issues in the workplace. This study consulted occupational health and safety (OHS) practitioners, examining their perceptions of sedentary health risks and views on strategies and influences to reduce and break prolonged occupational sitting. Three focus groups were conducted with convenience samples of OHS practitioners (n=34; 6 men; 46.4 ± 9.6 years) attending an Australian national conference in November 2010. Open-ended questions concerning health risks, sitting reduction strategies and influences were posed by lead researchers and practitioners invited to express opinions, viewpoints and experiences. Audio-recordings and summary notes of focus group discussions were reviewed by researchers to identify key response themes. OHS practitioners were well informed about the chronic disease and musculoskeletal risks associated with prolonged occupational sitting, but noted the importance of not replacing one workplace health issue (too much sitting) with another (too much standing). Ideas for strategies were diverse and explored the dichotomy between providing choices for employees to stand and move more (e.g. sit-stand desks), as opposed to obligating change through adapting job and office design (e.g. centralising printers and scanners). Productivity concerns were cited as a major influence for change. OHS practitioners also highlighted the value of using cross-disciplinary expertise to bridge the gap between research and practice. This study identified that OHS practitioners in Australia have a good understanding of the risks of prolonged occupational sitting and potential strategies to manage these risks.

  13. Nuclear risk: information of medical practitioners in Isere Department. Impact of the booklet: 'doctors and nuclear risk'

    International Nuclear Information System (INIS)

    Jonquet, M.E.

    1990-02-01

    In this thesis, the author first presents 'Isere, pilot department' operation, then the importance of nuclear risks in Isere, considers the role and place of medical practitioners in the management of this risk and in information request of medical personnel. The author also presents the booklet 'Doctors and nuclear risk' and analyzes the results of study on its impact close to medical population. 9 tabs., 25 figs

  14. Tuberculosis management practices by private practitioners in Andhra Pradesh, India.

    Science.gov (United States)

    Achanta, Shanta; Jaju, Jyoti; Kumar, Ajay M V; Nagaraja, Sharath Burugina; Shamrao, Srinivas Rao Motta; Bandi, Sasidhar Kumar; Kumar, Ashok; Satyanarayana, Srinath; Harries, Anthony David; Nair, Sreenivas Achutan; Dewan, Puneet K

    2013-01-01

    Private medical practitioners in Visakhapatnam district, Andhra Pradesh, India. To evaluate self-reported TB diagnostic and treatment practices amongst private medical practitioners against benchmark practices articulated in the International Standards of Tuberculosis Care (ISTC), and factors associated with compliance with ISTC. Cross- sectional survey using semi-structured interviews. Of 296 randomly selected private practitioners, 201 (68%) were assessed for compliance to ISTC diagnostic and treatment standards in TB management. Only 11 (6%) followed a combination of 6 diagnostic standards together and only 1 followed a combination of all seven treatment standards together. There were 28 (14%) private practitioners who complied with a combination of three core ISTC (cough for tuberculosis suspects, sputum smear examination and use of standardized treatment). Higher ISTC compliance was associated with caring for more than 20 TB patients annually, prior sensitization to TB control guidelines, and practice of alternate systems of medicine. Few private practitioners in Visakhapatnam, India reported TB diagnostic and treatment practices that met ISTC. Better engagement of the private sector is urgently required to improve TB management practices and to prevent diagnostic delay and drug resistance.

  15. Tuberculosis management practices by private practitioners in Andhra Pradesh, India.

    Directory of Open Access Journals (Sweden)

    Shanta Achanta

    Full Text Available SETTING: Private medical practitioners in Visakhapatnam district, Andhra Pradesh, India. OBJECTIVES: To evaluate self-reported TB diagnostic and treatment practices amongst private medical practitioners against benchmark practices articulated in the International Standards of Tuberculosis Care (ISTC, and factors associated with compliance with ISTC. DESIGN: Cross- sectional survey using semi-structured interviews. RESULTS: Of 296 randomly selected private practitioners, 201 (68% were assessed for compliance to ISTC diagnostic and treatment standards in TB management. Only 11 (6% followed a combination of 6 diagnostic standards together and only 1 followed a combination of all seven treatment standards together. There were 28 (14% private practitioners who complied with a combination of three core ISTC (cough for tuberculosis suspects, sputum smear examination and use of standardized treatment. Higher ISTC compliance was associated with caring for more than 20 TB patients annually, prior sensitization to TB control guidelines, and practice of alternate systems of medicine. CONCLUSION: Few private practitioners in Visakhapatnam, India reported TB diagnostic and treatment practices that met ISTC. Better engagement of the private sector is urgently required to improve TB management practices and to prevent diagnostic delay and drug resistance.

  16. Operations Management Teaching: Establishing Content and Relevance to Practitioners

    Science.gov (United States)

    Doran, Desmond; Hill, Alex; Brown, Steve; Aktas, Emel; Kuula, Markku

    2013-01-01

    This paper explores the relevance to industry's needs of operations management (OM) teaching in higher education, by researching the content of OM modules delivered by UK academics and comparing the results of this research with the views of business practitioners having had first-hand experience of OM teaching on MBA programmes. To determine…

  17. Knowledge management matters words of wisdom from leading practitioners

    CERN Document Server

    Girard, Jo Ann

    2018-01-01

    Knowledge Management Matters: Words of Wisdom from Leading Practitioners is a collection of works penned by this amazing and diverse group of thought leaders. Each of these trailblazers has generously shared their knowledge with a view to helping you and your organization succeed in the knowledge environment. The tips, tactics, and techniques they suggest are time-tested and proven concepts that will help you achieve your organizational objectives. Their collective works are based on decades of experiences with real-world organizations. This is not a book of untested theories that might work, but rather a compilation of genuine words of wisdom from experienced KM practitioners who know knowledge management. Knowledge Management Matters starts with a brief overview of the evolution of knowledge management. Building on this historical foundation, we launch a wide-ranging exploration of the domain. Throughout the book are excellent examples of what works, what doesn't, and some thought-provoking teases about th...

  18. Head injury management guidelines for general practitioners

    Directory of Open Access Journals (Sweden)

    Jeremy C Ganz

    2011-01-01

    Full Text Available A complete examination of a head injured patient in the hospital requires a number of instruments. These include a stethoscope, sphygmomanometer, ophthalmoscope, otoscope, cotton wool, safety pin, tuning fork, reflex hammer and a small key to test the plantar response. Few of these are required at the accident scene. This is because, in the hospital, the aim is optimal definitive treatment. At the accident scene, the aim is prevention of secondary injury, rapid recording of the most important findings and safe efficient transport to the hospital. This short paper reviews how the local doctor should undertake a neurosurgical assessment of traumatic brain injury patients. Moreover, the primary management at accident scenes is described and the rationale behind the approach is outlined

  19. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  20. Risk communication between general practitioners and patients with hypercholesterolemia

    DEFF Research Database (Denmark)

    Hansen, Bo; Kirkegaard, Pia; Lauritzen, Torsten

      Purpose: It is important that the general practitioners (GPs) are able to intervene to reduce risk of disease. One of the key points in doing so is effective risk communication that decreases uncertainty about choice of treatment and gives the patients a greater understanding of benefits......, and psychological well-being.    Methods: 40 GPs receive training in risk communication. Each GP selects 7 patients with elevated cholesterol. These patients are informed about the opportunity to receive preventive pharmacological treatment. Another 280 patients receive the same opportunity from 40 GPs without...... their psychological well-being.   Conclusion: This randomised intervention study will produce new knowledge about the effect of training GPs in risk communication....

  1. Knowledge, attitudes and management skills of medical practitioners regarding weight management

    OpenAIRE

    Vangile B. Mkhatshwa; Gboyega A. Ogunbanjo; Langalibalele H. Mabuza

    2016-01-01

    Background: Overweight and obesity have become a global problem. Health professionals are poorly prepared in weight management, which has an effect on their attitudes and management skills with regard to overweight and obese patients.Aim and setting: To assess the knowledge, attitudes and management skills of medical practitioners regarding weight management at Odi District Hospital, Gauteng Province, South Africa.Methods: We conducted a cross-sectional study on 48 medical practitioners at Od...

  2. Risk Judgment by General Dental practitioners: Rational but Uninformed.

    Science.gov (United States)

    Ellervall, Eva; Brehmer, Berndt; Knutsson, Kerstin

    2010-01-01

    Decisions by dentists to administer antibiotic prophylaxis to prevent infectious complications in patients involves professional risk assessment. While recommendations for rational use have been published, several studies have shown that dentists have low adherence to these recommendations. To examine general dental practitioners' (GDPs') assessments of the risk of complications if not administering antibiotic prophylaxis in connection with dental procedures in patients with specific medical conditions. Postal questionnaires in combination with telephone interviews. Risk assessments were made using visual analogue scales (VAS), where zero represented "insignificant risk" and 100 represented a "very significant risk". Response rate: 51%. The mean risk assessments were higher for GDPs who administered antibiotics (mean = 54, SD = 23, range 26-72 mm on the VAS) than those who did not (mean = 14, SD = 12, range 7-31 mm) (P rational but uninformed. They administered antibiotics in a manner that was consistent with their risk assessments. Their risk assessments, however, were overestimated. Inaccurate judgments of risk should not be expected to disappear in the presence of new information. To achieve change, clinicians must be motivated to improve behaviour and an evidence-based implementation strategy is required.

  3. Managing risks

    International Nuclear Information System (INIS)

    Nathwani, J.S.

    1993-01-01

    The three principles to guide regulating authorities are: Risks shall be managed to maximize the total expected net benefit to society; The safety benefit to be promoted is quality-adjusted life expectancy; Decisions for the public in regard to health and safety must be open and apply across the entire range of hazards to life and health. Based on the principle that excessive spending on health and safety, or lack of necessary development, may cause poverty and thereby actually decrease (adjusted) life expectancy, the author has developed a Life Product Index which gives comparable results to the Human Development Index promoted by the United Nations Development Program. These two social indicators can be used for purposes such as project evaluation, choosing between alternative technologies, or evaluation of health and safety programs

  4. Cumulative Risk Assessment Toolbox: Methods and Approaches for the Practitioner

    Directory of Open Access Journals (Sweden)

    Margaret M. MacDonell

    2013-01-01

    Full Text Available The historical approach to assessing health risks of environmental chemicals has been to evaluate them one at a time. In fact, we are exposed every day to a wide variety of chemicals and are increasingly aware of potential health implications. Although considerable progress has been made in the science underlying risk assessments for real-world exposures, implementation has lagged because many practitioners are unaware of methods and tools available to support these analyses. To address this issue, the US Environmental Protection Agency developed a toolbox of cumulative risk resources for contaminated sites, as part of a resource document that was published in 2007. This paper highlights information for nearly 80 resources from the toolbox and provides selected updates, with practical notes for cumulative risk applications. Resources are organized according to the main elements of the assessment process: (1 planning, scoping, and problem formulation; (2 environmental fate and transport; (3 exposure analysis extending to human factors; (4 toxicity analysis; and (5 risk and uncertainty characterization, including presentation of results. In addition to providing online access, plans for the toolbox include addressing nonchemical stressors and applications beyond contaminated sites and further strengthening resource accessibility to support evolving analyses for cumulative risk and sustainable communities.

  5. Should the General Practitioner Consider Mesotherapy (Intradermal Therapy) to Manage Localized Pain?

    OpenAIRE

    Mammucari, M; Maggiori, E; Lazzari, M; Natoli, S

    2016-01-01

    Wide variations in the types of pain and response to analgesic pharmacotherapy mean that a variety of treatment strategies are needed. One approach is mesotherapy (intradermal therapy). This consists of microinjections into the skin and is ideally suited to the management of localized pain. Advantages include increasing the duration of drug activity, reduced risk of adverse events and interactions, and possible synergy with other therapies. Mesotherapy provides general practitioners with anot...

  6. Spiritual beliefs and barriers among managed care practitioners.

    Science.gov (United States)

    McCauley, Jeanne; Jenckes, Mollie W; Tarpley, Margaret J; Koenig, Harold G; Yanek, Lisa R; Becker, Diane M

    2005-01-01

    Ninety percent of American adults believe in God and 82% pray weekly. A majority wants their physicians to address spirituality during their health care visit. However, clinicians incorporate spiritual discussion in less than 20% of visits. Our objectives were to measure clinician beliefs and identify perceived barriers to integrating spirituality into patient care in a statewide, primary care, managed care group. Practitioners completed a 30-item survey including demographics and religious involvement (DUREL), spirituality in patient care (SPC), and barriers (BAR). We analyzed data using frequencies, means, standard deviations, and ANOVA. Clinicians had a range of religious denominations (67% Christian, 14% Jewish, 11% Muslim, Hindu or Buddhist, 8% agnostic), were 57% female and 24% had training in spirituality. Sixty-six percent reported experiencing the divine. Ninety-five percent felt that a patient's spiritual outlook was important to handling health difficulties and 68% percent agreed that addressing spirituality was part of the physician's role. Ninety-five percent of our managed care group noted 'lack of time' as an important barrier, 'lack of training' was indicated by 69%, and 21% cited 'fear of response from administration'. Managed care practitioners in a time constrained setting were spiritual themselves and believed this to be important to patients. Respondents indicated barriers of time and training to implementing these beliefs. Comparing responses from our group to those in other published surveys on clinician spirituality, we find similar concerns. Clinician education may overcome these barriers and improve ability to more fully meet their patients' expressed needs regarding spirituality and beliefs.

  7. Risk management

    International Nuclear Information System (INIS)

    Magne, L.

    1999-01-01

    There is always a risk of an accident occurring at a nuclear power plant, however small. The problem lies in estimating the probability of it occurring. The method of probabilistic safety assessment provides this estimate, and by identifying the sources of potential risk, makes it possible to prevent them from occurring. It is not, however, a substitute for other decision-making processes. (author)

  8. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  9. Leadership and management curriculum planning for Iranian general practitioners.

    Science.gov (United States)

    Khosravan, Shahla; Karimi Moonaghi, Hossein; Yazdani, Shahram; Ahmadi, Soleiman; Mansoorian, Mohammad Reza

    2015-10-01

    Leadership and management are two expected features and competencies for general practitioners (GPs). The purpose of this study was leadership and management curriculum planning for GPs which was performed based on Kern's curriculum planning cycle. This study was conducted in 2011- 2012 in Iran using an explanatory mixed-methods approach. It was conducted through an initial qualitative phase using two focus group discussions and 28 semi-structured interviews with key informants to capture their experiences and viewpoints about the necessity of management courses for undergraduate medical students, goals, objectives, and educational strategies according to Kern's curriculum planning cycle. The data was used to develop a questionnaire to be used in a quantitative written survey. Results of these two phases and that of the review of medical curriculum in other countries and management curriculum of other medical disciplines in Iran were used in management and leadership curriculum planning. In the qualitative phase, purposeful sampling and content analysis with constant comparison based on Strauss and Corbin's method were used; descriptive and analytic tests were used for quantitative data by SPSS version 14. In the qualitatively stage of  this research, 6 main categories including the necessity of management course, features and objectives of management curriculum, proper educational setting, educational methods and strategies, evolutionary method and feedback result were determined. In the quantitatively stage of the research, from the viewpoints of 51.6% of 126 units of research who filled out the questionnaire, ranked high necessary of management courses. The coordination of care and clinical leadership was determined as the most important role for GPs with a mean of 6.2 from sample viewpoint. Also, team working and group dynamics had the first priority related to the principles and basics of management with a mean of 3.59. Other results were shown in the paper

  10. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  11. Knowledge, attitudes and management skills of medical practitioners regarding weight management.

    Science.gov (United States)

    Mkhatshwa, Vangile B; Ogunbanjo, Gboyega A; Mabuza, Langalibalele H

    2016-11-29

    Overweight and obesity have become a global problem. Health professionals are poorly prepared in weight management, which has an effect on their attitudes and management skills with regard to overweight and obese patients.Aim and setting: To assess the knowledge, attitudes and management skills of medical practitioners regarding weight management at Odi District Hospital, Gauteng Province, South Africa. We conducted a cross-sectional study on 48 medical practitioners at Odi Hospital between 01 October and 31 October 2013. A self-administered questionnaire was used to assess their knowledge, attitudes and management skills in weight management. The SPSS® statistical software (Version 22) was used for data analysis. A p < 0.05 was considered significant. Fifty medical practitioners were recruited, 48 consented to participate and 28 (58.3%) were male. Their categories were community service doctors (3), medical officers (21), registrars (22) and others (2). Thirty-seven (77.1%) never received training in weight management (p < 0.001). Thirty-two (66.7%) regarded weight management as not confined to a dietician (p < 0.001) and 27 (56.2%) regarded weight management as usually unsuccessful (p = 0.004). Forty-seven (97.9%) provided lifestyle modifications and 43 (89.6%) involved the patient's family in weight management (p < 0.001). More non-registrars [14 (77.8%)] than registrars [8 (38.1%)] measured the body mass index (BMI) routinely (p = 0.013). Few medical practitioners received training in weight management. They regarded weight management as usually unsuccessful and lacked confidence in the same owing to lack of training. They provided lifestyle modifications and involved the patient's family in weight management. Non-registrars measured the BMI routinely. There is a need for training in weight management at undergraduate and post-graduate levels.

  12. How General Practitioners and Their Patients Adhere to Osteoporosis Management: A Follow-Up Survey among Czech General Practitioners

    Directory of Open Access Journals (Sweden)

    Magda Vytrisalova

    2017-05-01

    Full Text Available Introduction: General practitioners (GPs are key participants in osteoporosis (OP management. The aim was to evaluate their adherence to lege artis management of the disease, potential barriers, and to discuss differences observed in comparison with the baseline survey carried out in 2007; the focus was on secondary prevention.Methods: On behalf of two professional associations, 2-round postal survey among randomly selected GPs (>1/4 of all Czech GPs was performed in 2014. The questionnaire covered areas concerning GP's role in the fight against OP, knowledge about OP, management of OP-related fractures, barriers to the management of OP, system- and patient-related in particular, and availability and use of information sources.Results: The overall questionnaire return rate was 37% (551 respondents; mean age of the respondents was 53 year (37% men. The GP's role in the treatment of OP was rated as essential in 28 and 37% of men and women, respectively (P = 0.012. The guideline for diagnosis and treatment of OP for GPs was considered accessible by 92% of respondents. As much as 60% of the respondents were adherent to the guideline, i.e., used it repeatedly. The knowledge of several risk factors was very good, however, recommended daily intake of calcium was stated correctly by only 41% of respondents, and daily intake of vitamin D by only 40%. Three quarters reported active steps after a fracture: referral to a specialist, life-style recommendations, prescription of calcium/vitamin D supplements. Half of the respondents focus on fall prevention. System-related barriers, such as lack of possibility to prescribe selected drugs (61% and financial limits set by health insurance company (44% were most frequently reported. Patient-related barriers were also common, patient's non-adherence (reported by 29% and patient's reluctance to go to a specialist (18%.Conclusion: GPs adhered to OP management more than in 2007. Knowledge of risk factors and

  13. Enterprise risk management

    Energy Technology Data Exchange (ETDEWEB)

    Eaton, C. [Enbridge, Calgary, AB (Canada)

    2015-07-01

    Enterprise risk management (ERM) is a relative new, holistic and strategic approach for managing risks in modern organizations. ERM builds on and extends traditional risk management (RM). Risk is the effect of uncertainty on objectives - positive and/or negative. Risk management is a set of practices used to understand and address risk. ERM is a form of RM that emphasizes risk aggregation and integration. Risk aggregation is combining individual risks into categories ({sup r}olled up{sup )}. risk integration is embedding RM into organizational contexts ({sup b}uilt in{sup )}.

  14. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  15. Should the General Practitioner Consider Mesotherapy (Intradermal Therapy) to Manage Localized Pain?

    Science.gov (United States)

    Mammucari, Massimo; Maggiori, Enrica; Lazzari, Marzia; Natoli, Silvia

    2016-06-01

    Wide variations in the types of pain and response to analgesic pharmacotherapy mean that a variety of treatment strategies are needed. One approach is mesotherapy (intradermal therapy). This consists of microinjections into the skin and is ideally suited to the management of localized pain. Advantages include increasing the duration of drug activity, reduced risk of adverse events and interactions, and possible synergy with other therapies. Mesotherapy provides general practitioners with another tool for the treatment of local pain. However, it is important to provide patients with full details of the pros and cons of this approach and obtain informed patient consent.

  16. The business management preceptorship within the nurse practitioner program.

    Science.gov (United States)

    Wing, D M

    1998-01-01

    Changes in health care reimbursement practices have affected the way in which primary health care is provided. To be successful, nurse practitioners must have a proficient understanding of basic business functions, including accounting, finance, economics, marketing, and reimbursement practices. Yet, many graduates of nurse practitioner programs are not adequately prepared to make fundamental business decisions. Therefore, it is essential that nurse practitioner faculty provide learning experiences on primary practice business. Because the preceptor experience is an integral aspect of nurse practitioner education, a business preceptorship provides students with pragmatic knowledge of the clinical practice within a business framework. The University of Indianapolis School of Nursing offers a nurse practitioner business preceptorship. The implementation, challenges, and positive outcomes of the course are discussed in this article.

  17. Risk management and safety

    International Nuclear Information System (INIS)

    Niehaus, F.; Novegno, A.

    1985-01-01

    Risk assessment, including probabilistic analyses, has made great progress over the past decade. In spite of the inherent uncertainties it has now become possible to utilize methods and results for decision making at various levels. This paper will, therefore, review risk management in industrial installations, risk management for energy safety policy and prospects of risk management in highly industrialized areas. (orig.) [de

  18. Physical Activity of Nurse Clinical Practitioners and Managers.

    Science.gov (United States)

    Jirathananuwat, Areeya; Pongpirul, Krit

    2017-11-01

    This study was aimed (1) to compare the level of physical activity (PA) between working and nonworking hours and (2) to compare the level of PA during working hours of nurse clinical practitioners (NCPs) with that of nurse managers (NMs). This cross-sectional survey was conducted at a Thai university hospital from October 2015 to March 2016. All randomly selected participants wore an activity tracker on their hip for 5 days, except during bathing and sleeping periods, to record step counts and time points. Of 884 nurses, 289 (142 NCPs and 147 NMs) were randomly selected. The average age was 35.87 years. They spent 9.76 and 6.01 hours on work and nonwork activities, respectively. Daily steps per hour were significantly lower during work than nonwork periods (P work period of NCP was significantly higher than that of NM even after adjusting for age, work experience, and body mass index (P = .034). NCP had higher overall PA than NM, which was partly contributed by work-related PA. Level of PA for a professional with variation of actual work hours should be measured on hourly basis.

  19. Risk management at university

    OpenAIRE

    Ivanova, H.; Abramovich, S.

    2013-01-01

    This article observes the basic recommendations for the risk management system in higher education as an example Yanka Kupala State University of Grodno. Consider the risk-management standard that based in a process approach

  20. Management of business risks

    OpenAIRE

    BAZARBAY A.

    2015-01-01

    The article presents methodological ideas concerning the problem of risk management. Special attention is paid to increasing of enterprises' operating efficiency by means of risk-management system development in business organizations.

  1. Rethinking risk management

    International Nuclear Information System (INIS)

    Kloman, H.F.

    1992-01-01

    The purpose of this paper is to bring together the ideas of those who currently practice the many different forms of risk management on a global basis. These forms include guidance of public policy on macro risks, risk financing and insurance for many larger commercial organizations, managing credit, currency and interest rate risks for financial institutions, plus other extensions of risk management including security, quality control, and quality assurance in a health-care environment

  2. Commodity risk management

    Directory of Open Access Journals (Sweden)

    Hilary Till

    2016-09-01

    Full Text Available This article discusses the practical issues involved in applying a disciplined risk management methodology to commodity futures trading. Accordingly, the paper shows how to apply methodologies derived from both conventional asset management and hedge fund management to futures trading. The article also discusses some of the risk management issues that are unique to leveraged futures trading.

  3. Certification and risk management

    International Nuclear Information System (INIS)

    Villanueva Fernandez, M.

    2015-01-01

    Nowadays more organizations are increasingly aware of the importance of properly managing the uncertainty of its activities and build competitive advantages through the identification, assessment and management of risks that they face. Risk management is also an aspect of great importance within the new version of ISO fact it is one of the most innovative and also the most laborious, because an appropriate risk management achieves expected results and customer satisfaction. In conclusion, risk management is a new field of business and can be considered a cross-cutting component for other relevant factors of organizational change management. (Author)

  4. [Global risk management].

    Science.gov (United States)

    Sghaier, W; Hergon, E; Desroches, A

    2015-08-01

    Risk management is a fundamental component of any successful company, whether it is in economic, societal or environmental aspect. Risk management is an especially important activity for companies that optimal security challenge of products and services is great. This is the case especially for the health sector institutions. Risk management is therefore a decision support tool and a means to ensure the sustainability of an organization. In this context, what methods and approaches implemented to manage the risks? Through this state of the art, we are interested in the concept of risk and risk management processes. Then we focus on the different methods of risk management and the criteria for choosing among these methods. Finally we highlight the need to supplement these methods by a systemic and global approach including through risk assessment by the audits. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  5. Risk management in Takaful

    OpenAIRE

    Akhter, Waheed

    2010-01-01

    Risk management is of vital importance in Islam and Takāful provides a way to manage risks in business according to Sharī’ah principles. This research paper attempts to identify various types of risks involved in Takāful business that affect operational and investment functions of Takāful operators across the globe. It lays down criteria for Takāful operator to manage those risks effectively. However, Takāful operators often face difficulty in managing market and credit risks as Sharī’ah comp...

  6. Mercury and Other Biomedical Waste Management Practices among Dental Practitioners in India

    Directory of Open Access Journals (Sweden)

    Raghuwar D. Singh

    2014-01-01

    Full Text Available Objectives. The objective of the study was to assess the awareness and performance towards dental waste including mercury management policy and practices among the dental practitioners in North India. Materials and Methods. An epidemiologic survey was conducted among 200 private dental practitioners. The survey form was composed of 29 self-administered questions frame based on knowledge, attitude, and those regarding the practices of dentists in relation to dental health-care waste management. The resulting data were coded and a statistical analysis was done. Results and Discussion. About 63.7% of the dentists were not aware of the different categories of biomedical waste generated in their clinics. Only 31.9% of the dentists correctly said that outdated and contaminated drugs come under cytotoxic waste. 46.2% said they break the needle and dispose of it and only 21.9% use needle burner to destroy it. 45.0% of the dentists dispose of the developer and fixer solutions by letting them into the sewer, 49.4% of them dilute the solutions and let them into sewer and only 5.6% return them to the supplier. About 40.6% of the dentists dispose of excess silver amalgam by throwing it into common bin. Conclusion. It was concluded that not all dentists were aware of the risks they were exposed to and only half of them observe infection control practices.

  7. Financial Risk Management

    OpenAIRE

    Catalin-Florinel Stanescu; Laurentiu Mircea Simion

    2011-01-01

    Concerns about the financial risk is increasing. In this climate, companies of all types and sizes want a robust framework for financial risk management to meet compliance requirements, contribute to better decision making and increase performance. Financial risk management professionals working with financial institutions and other corporate clients to achieve these objectives.

  8. Impact of managed care on healthcare delivery practices: the perception of healthcare administrators and clinical practitioners.

    Science.gov (United States)

    Tietze, Mari F

    2003-01-01

    Managed care has introduced changes, such as cost effectiveness, access to care, and quality of care, to many components of the U.S. healthcare delivery system. These changes have affected how healthcare administrators and clinical practitioners perceive the impact of managed care on healthcare delivery practices. A survey was initiated to explore whether the perceptions of administrators differed from those of practitioners and to discover which organizational variables could explain the difference. A descriptive, cross-sectional survey design was used for the target population of administrators and practitioners in high, moderate, and low managed-care-penetration markets. Two investigator-developed instruments--the Managed Care Perceptions Inventory (MCPI) and the MCPI-Demographic--and an intact centralization of decision-making assessment subscale were used for data collection. Administrators had a statistically significant, more positive perception of the impact of managed care on healthcare delivery than did practitioners. When the distinction between administrator and practitioner was not used as a grouping factor, managed care market penetration, nonprofit status, and years in current employment position were factors that had statistically significant associations with a more positive perception of managed care. Based on these findings, both administrators and practitioners have a role in maintaining awareness regarding their perceptions and should work collaboratively to address issues of concern. Similarly, promoting trust and commitment at the organizational level is important. Recommendations for further research are also provided.

  9. Value of risk management

    OpenAIRE

    Vik, Marie Amdal

    2012-01-01

    Master's thesis in Risk management The overall aim of this study was to discuss the validity of the hypothesis that risk management contributes with added value to projects and the enterprise holding the projects, and consequently to the enterprise’s stakeholders. To examine this hypothesis, a case study of three projects taken from the same portfolio at Statoil was selected. The projects were said to have an active risk management. Data was collected from the project’s documentation as...

  10. Supply Cain Risk Management

    OpenAIRE

    Goodwin, Les

    2011-01-01

    “The management of supply chain risk is crucial to any business, more so to Rolls Royce who face an almost doubling of load within the next 10 years. So what is supply chain risk management and how well is it deployed within an operational business of Rolls Royce? What are the tools and techniques available and what are the key issues around implementing world class supply chain risk management with a Supply Chain Unit within Rolls Royce?”

  11. Supply chain risk management

    OpenAIRE

    Christian Hollstein; Frank Himpel

    2013-01-01

    Background: Supply chain risk management increasingly gains prominence in many international industries. In order to strengthen supply chain structures, processes, and networks, adequate potentials for risk management need to be built (focus on effective logistics) and to be utilized (focus on efficient logistics). Natural-based disasters, such as the case of Fukushima, illustrate how crucial risk management is. Method: By aligning a theoretical-conceptual framework with empirical-induct...

  12. Exchange Risk Management Policy

    CERN Document Server

    2005-01-01

    At the Finance Committee of March 2005, following a comment by the CERN Audit Committee, the Chairman invited the Management to prepare a document on exchange risk management policy. The Finance Committee is invited to take note of this document.

  13. Identifying and Managing Risk.

    Science.gov (United States)

    Abraham, Janice M.

    1999-01-01

    The role of the college or university chief financial officer in institutional risk management is (1) to identify risk (physical, casualty, fiscal, business, reputational, workplace safety, legal liability, employment practices, general liability), (2) to develop a campus plan to reduce and control risk, (3) to transfer risk, and (4) to track and…

  14. Risk management overview

    International Nuclear Information System (INIS)

    McGovern, S.

    1995-01-01

    Launching of the first natural gas contract by the New York Mercantile Exchange (NYMEX) in April 1990 was a huge success which allowed natural gas to surpass crude oil as the most successful launch of any commodity contract. Despite this unprecedented initial success it must be kept in mind that in a competitive marketplace there are risks of many kinds (market risks, price risks, basis risks, currency risks and timing risks), that parties must deal with in everyday operations. The concept of risk management was defined, techniques and issues in risk management were explained, a glossary of fully explained industry terms, and basic financial tools most often used in risk management, were provided. 11 figs

  15. Adult and Middle School Girls' Perceptions of Risk-Taking Behavior: Implications for School Practitioners

    Science.gov (United States)

    Solomon, Brett Johnson; Garibaldi, Mark

    2013-01-01

    There is an overwhelming disconnect between young adolescent girls and adults, in relationship to perceptions of middle schoolgirl risk taking. This mixed-methods study investigates the differences between adult practitioners and middle school girls' perceptions of risk taking, understanding of consequences, and needs among middle school girls.…

  16. Risk Judgment by General Dental Practitioners: Rational but Uninformed

    Directory of Open Access Journals (Sweden)

    Eva Ellervall

    2010-04-01

    Full Text Available Background: Decisions by dentists to administer antibiotic prophylaxis to prevent infectious complications in patients involves professional risk assessment. While recommendations for rational use have been published, several studies have shown that dentists have low adherence to these recommendations. Objective: To examine general dental practitioners’ (GDPs’ assessments of the risk of complications if not administering antibiotic prophylaxis in connection with dental procedures in patients with specific medical conditions. Methods: Postal questionnaires in combination with telephone interviews. Risk assessments were made using visual analogue scales (VAS, where zero represented “insignificant risk” and 100 represented a “very significant risk”. Results: Response rate: 51%. The mean risk assessments were higher for GDPs who administered antibiotics (mean = 54, SD = 23, range 26–72 mm on the VAS than those who did not (mean = 14, SD = 12, range 7–31 mm (P < 0.05. Generally, GDPs made higher risk assessments for patients with medical conditions that are included in recommendations than those with conditions that are not included. Overall, risk assessments were higher for tooth removal than for scaling or root canal treatment, even though the risk assessments should be considered equal for these interventions. Conclusions: GDPs’ risk assessments were rational but uninformed. They administered antibiotics in a manner that was consistent with their risk assessments. Their risk assessments, however, were overestimated. Inaccurate judgments of risk should not be expected to disappear in the presence of new information. To achieve change, clinicians must be motivated to improve behaviour and an evidence- based implementation strategy is required.

  17. Chronic kidney disease in an Aboriginal population: A nurse practitioner-led approach to management.

    Science.gov (United States)

    Barrett, Elizabeth; Salem, Lesley; Wilson, Sue; O'Neill, Claire; Davis, Kathleen; Bagnulo, Sharif

    2015-12-01

    Chronic kidney disease (CKD) is a significant health problem impacting Australia's Aboriginal and Torres Strait Islander population. After age adjustment, the prevalence of kidney disease is 3.7 times higher in Aboriginal people and 7.3 times higher for end-stage kidney disease compared with the wider population. Yet at an Aboriginal Community Controlled Health Service (ACCHS) with a significant patient population, fewer than expected numbers of Aboriginal patients were identified with CKD. The ACCHS engaged a nurse practitioner to lead a systematic approach to the identification and treatment of CKD. This nurse practitioner-led approach to CKD was developed and implemented at a rural NSW ACCHS, with the support of a partnership formed between the nurse practitioner, the ACCHS, a nephrologist from a referral hospital and a statewide NGO. The primary measure for improvement has been to identify and stage patients with CKD and establish management plans as appropriate. This nurse-led project was established to: (i) identify patients with CKD; (ii) provide access for CKD patients to appropriate services; (iii) commence pharmacological and non-pharmacological strategies that enable remission or regression of CKD; and (iv) educate practice GPs and other staff members on CKD clinical guidelines and best practice. The CKD project has improved access to essential health care for vulnerable and at-risk populations, with 187 patients to date having been identified with kidney disease and staged for its severity. The need for strong multi-disciplinary teamwork has been demonstrated with good communication strategies implemented. © 2015 National Rural Health Alliance Inc.

  18. Risk Judgment by General Dental practitioners: Rational but Uninformed

    OpenAIRE

    Ellervall, Eva; Brehmer, Berndt; Knutsson, Kerstin

    2010-01-01

    Background: Decisions by dentists to administer antibiotic prophylaxis to prevent infectious complications in patients involves professional risk assessment. While recommendations for rational use have been published, several studies have shown that dentists have low adherence to these recommendations. Objective: To examine general dental practitioners’ (GDPs’) assessments of the risk of complications if not administering antibiotic prophylaxis in connection with dental procedures in patients...

  19. Diagnosis and management of geriatric insomnia: a guide for nurse practitioners.

    Science.gov (United States)

    Krishnan, Preetha; Hawranik, Pamela

    2008-12-01

    To discuss the assessment, diagnosis, and management of geriatric insomnia, a challenging clinical condition of older adults frequently seen by primary care providers. Extensive literature review of the published research articles and textbooks. Complaints of insomnia among older adults are frequently ignored, considered a part of the normal aging process or viewed as a difficult to treat condition. Geriatric insomnia remains a challenge for primary care providers because of the lack of evidence-based clinical guidelines and limited treatment options available. Effective management of this condition is necessary for improved quality of life, which is a primary issue for the elderly and their families. Therefore, geriatric insomnia warrants thorough attention from the nurse practitioners (NPs) who provide care for older adults. Undiagnosed or under treated insomnia can cause increased risk for falls, motor vehicle accidents, depression, and shorter survival. Insomniacs double their risk for cardiovascular disease, stroke, cancer, and suicide compared to their counterparts. Insomnia is also associated with increased healthcare utilization and institutionalization. NPs could play a central role in reducing the negative consequences of insomnia through a systematic approach for diagnosis, evaluation, and management.

  20. Perspectives: Intellectual Risk Management

    Science.gov (United States)

    Hall, James C.

    2013-01-01

    Ask a college administrator about students and risk management, and you're likely to get a quick and agitated speech about alcohol consumption and bad behavior or a meditation on mental health and campus safety. But in colleges and universities, we manage intellectual risk-taking too. Bring that up, and you'll probably get little out of that same…

  1. Risk Management and Simulation

    DEFF Research Database (Denmark)

    Skovmand, David

    2014-01-01

    Review of: Risk Management and Simulation / Aparna Gupta. Boca Raton, FL: CRC Press, 2013, xxix + 491 pp., $99.95(H), ISBN: 978-1-4398-3594-4.......Review of: Risk Management and Simulation / Aparna Gupta. Boca Raton, FL: CRC Press, 2013, xxix + 491 pp., $99.95(H), ISBN: 978-1-4398-3594-4....

  2. Agricultural risk management

    DEFF Research Database (Denmark)

    Lund, Mogens; Oksen, Arne; Larsen, Torben U.

    2005-01-01

    A new model for risk management in agriculture is described in the paper. The risk model is constructed as a context dependent process, which includes four main phases. The model is aimed at agricultural advisors, who wish to facilitate and disseminate risk management to farmers. It is developed...... and tested by an action research approach in an attempt to make risk management more applicable on family farms. Our obtained experiences indicate that farmers don’t apply probabilistic thinking and other concepts according to formal decision theory....

  3. How do private general practitioners manage tuberculosis cases? A survey in eight cities in Indonesia.

    Science.gov (United States)

    Mahendradhata, Yodi; Lestari, Trisasi; Probandari, Ari; Indriarini, Lucia Evi; Burhan, Erlina; Mustikawati, Dyah; Utarini, Adi

    2015-10-14

    Private practitioners (PPs) in high-burden countries often provide substandard tuberculosis (TB) treatment, leading to increased risk of drug resistance and continued transmission. TB case management among PPs in Indonesia has not been investigated in recent years, despite longstanding recognition of inadequate care and substantial investment in several initiatives. This study aimed to assess case management practices of private general practitioners (GPs) in eight major cities across Indonesia. A cross-sectional survey of private GPs was carried out simultaneously in eight cities by trained researchers between August and December 2011. We aimed for a sample size of 627 in total, and took a simple random sample of GPs from the validated local registers of GPs. Informed consent was obtained from participants prior to interview. Diagnostic and treatment practices were evaluated based on compliance with national guidelines. Descriptive statistics are presented. Of 608 eligible GPs invited to participate during the study period, 547 (89.9%) consented and completed the interview. A low proportion of GPs (24.6-74.3%) had heard of the International Standards for TB care (ISTC) and only 41.2-68.9% of these GPs had participated in ISTC training. As few as 47.3% (90% CI: 37.6-57.0%) of GPs reported having seen presumptive TB. The median number of cases of presumptive TB seen per month was low (0-5). The proportion of GPs who utilized smear microscopy for diagnosing presumptive adult TB ranged from 62.3 to 84.6%. In all cities, a substantial proportion of GPs (12.0-45.5%) prescribed second-line anti-TB drugs for treating new adult TB cases. In nearly all cities, less than half of GPs appointed a treatment observer (13.8-52.0%). The pattern of TB case management practices among private GPs in Indonesia is still not in line with the guidelines, despite longstanding awareness of the issue and considerable trialing of various interventions.

  4. Nurse Practitioners' Education, Awareness, and Therapeutic Approaches for the Management of Fibromyalgia.

    Science.gov (United States)

    Hughes, Linda; Adair, Jean; Feng, Feng; Maciejewski, Stephanie; Sharma, Harsha

    2016-01-01

    In the United States, fibromyalgia affects 2%-5% of the adult population, rendering it the most common chronic, widespread pain condition. The American College of Rheumatology has published diagnostic criteria for fibromyalgia, with the latest version in 2010. The purpose of this study was to evaluate nurse practitioners' education and awareness of fibromyalgia and to evaluate nurse practitioners' practices for the management of fibromyalgia. Sixty-six nurse practitioners voluntarily completed an online survey regarding their education, diagnosis, and treatment options for patients with fibromyalgia. The majority of participants reported that they always or occasionally had difficulty diagnosing fibromyalgia and worried about labeling their patients as having fibromyalgia. The most commonly used agents were nonsteroidal anti-inflammatory drugs (70%), serotonin norepinephrine reuptake inhibitors (61%), selective serotonin reuptake inhibitors (51%), and muscle relaxants (44%). Nondrug therapies included exercise (88%), cognitive behavior therapy (58%), and nutrition (56%). Further education is needed for nurse practitioners to increase confidence in diagnosing and managing fibromyalgia.

  5. The management object in risk management approaches

    OpenAIRE

    Christiansen, Ulrik

    2013-01-01

    Using a systematic review of the last 55 years of research within risk management this paper explores how risk management as a management technology (methodologies, tools and frameworks to mitigate or manage risks) singles out risks as an object for management in order to make action possible. The paper synthesise by developing a framework of how different views on risk management enable and constrain the knowledge about risk and thus frame the possibilities to measure, analyse an...

  6. Individual Property Risk Management

    Directory of Open Access Journals (Sweden)

    Michael S. Finke

    2010-01-01

    Full Text Available This paper reviews household property risk management and estimates normatively optimal choice under theoretical assumptions. Although risk retention limits are common in the financial planning industry, estimates of optimal risk retention that include both financial and human wealth far exceed limits commonly recommended. Households appear to frame property losses differently from other wealth losses leading to wealth-reducing, excess risk transfer. Possible theoretical explanations for excess sensitivity to loss are reviewed. Differences between observed and optimal risk management imply a large potential gain from improved choice.

  7. Credit risk management in the power sector

    International Nuclear Information System (INIS)

    Allen, D.

    2002-01-01

    Deregulation of the electric power industry has the potential to put power businesses at market risk particularly when the value of an asset or liability will change with market movements. Market risk gives rise to credit risk where a contract cannot be fulfilled. This presentation describes how credit risks can be identified and measured. Most practitioners use some variant of value-at-risk (VAR) technology for measuring market risk. Under this approach, risk is determined by the volatility implied by the market. Volatility of electricity prices and natural gas prices has increased significantly in Alberta in recent years. The consequence is an increase in both market and credit risk. The author described the difference between the two risks and their significance. An overview of credit risk management with derivatives, an over-the counter contract, was also presented. The author also discusses issue of protection buyers in the event of a failed contract. 9 figs

  8. Managing diversity in organisations: practitioner and academic perspectives: report from a gender in management special interest group research event

    OpenAIRE

    Beauregard, T. Alexandra

    2008-01-01

    Purpose - This report aims to provide a brief summary of the presentations made by researchers and practitioners at the Gender in Management Special Interest Group’s research event, Managing Diversity in Organisations: Practitioner and Academic Perspectives.\\ud \\ud Design/methodology/approach - The research seminar was chaired by Dr. Adelina Broadbridge (University of Stirling) and Dr. Gillian Maxwell (Glasgow Caledonian University), and featured five presentations related to diversity in org...

  9. Assessing Suicide Risk in Veterans: The Role of the Nurse Practitioner

    OpenAIRE

    Kathy Puskar; Giuliana Mazza

    2012-01-01

    Background: Statistics have shown that veteran men and women are at greater risk for suicide than the general population. In order to decrease the incidence of suicide in veterans, nurse practitioners (NPs) and other health care professionals must not only become more aware of the risk factors for veteran suicides but also develop strong psychiatric interviewing skills. Purpose: To discuss the risk factors associated with veteran suicide, the assessment tools to ensure a comprehensive...

  10. Optimizing risk management

    International Nuclear Information System (INIS)

    Kindred, G.W.

    2000-01-01

    Commercial nuclear power plant management is focussed on the safe, efficient, economical production of electricity. To accomplish the safe aspect of the equation, risk must be determined for the operation and maintenance of the facility. To accomplish the efficient aspect of the equation, management must understand those risks and factor risk insights into their decision process. The final piece of the equation is economical which is accomplished by minimizing, plant outage durations and proper utilization of resources. Probabilistic Risk Assessment can provide the risk insights to accomplish all three; safety, efficiency, and economically. How? Safe production of electricity can be quantified by use of PRA modeling and other risk insights that can determine the core damage frequency. Efficient production of electricity can be influenced by providing management with quantified risk insights for use in decision making. And, one example of economical production of electricity is by not having over conservative deterministic based defense in depth approaches to system maintenance and availability. By using risk-informed insights nuclear safety can be quantified and risk can be managed. Confidence in this approach can be achieved by ensuring the content and quality of the PRA is standardized throughout the industry. The time has arrived for Probabilistic Risk Assessment to take an active position as a major role player in the safe, efficient, and economical operation of commercial nuclear power plants. (author)

  11. Internal Audit and Risk Management

    OpenAIRE

    Constantin Nicolae Vasile; Alexandru Georgiana

    2011-01-01

    Internal audit and risk management have the same goal: the control of risk. There are various roles for the internal audit in respect of risk management. The main limitations of internal audit in respect of risk management regards assuming risk management tasks. One of the main issues regarding risk management is to make sure that the key risks are taken into consideration and that the management and the board of the organization take action as needed. Internal audit could give advice to mana...

  12. Building leadership capacity in advanced nurse practitioners - the role of organisational management.

    Science.gov (United States)

    Elliott, Naomi

    2017-01-01

    To highlight the organisation-level management's role in building leadership capacity in advanced nurse practitioners and the need for appropriate supports to increase their becoming leaders. Little is published about the role of organisation-level management in building leadership capacity and in developing the next generation of nurse leaders. In times of economic constraint, organisations need to focus their efforts on targeted leadership initiatives. Advanced nurse practitioners are ideally positioned to act as leaders both within and beyond the health care organisation. From the available research evidence, several support structures and mechanisms are identified as enablers for advanced nurse practitioners to enact their leadership role. Health care organisations need to include building leadership capacity as a priority in their strategic plan and take action to build-up the level of advanced nurse practitioner leadership. Nurse executives have a vital role in influencing the organisation's strategic plan and making a business case for prioritising leadership capacity building within advanced nurse practitioners. A challenge for nurse executives faced with competing service and leadership development demands, involves strategic decision-making regarding whether the advanced nurse practitioner's role is limited to service delivery or its potential in leading health care reforms is realised. © 2016 John Wiley & Sons Ltd.

  13. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  14. General Practitioners' Perceptions on Clinical Management and Training Needs regarding the Healthcare of Community-Dwelling People with Intellectual Disability: A Preliminary Survey in Singapore.

    Science.gov (United States)

    Sajith, Sreedharan Geetha; Goh, Yen-Li; Wee, Joshua Marcus

    2017-11-01

    Studies worldwide indicate that people with intellectual disability have high risks of physical and mental morbidities, and poor quality of health care. This study was aimed at determining general practitioners' perceptions on barriers in clinical assessment and training needs with regard to the healthcare of community-dwelling people with intellectual disability. A survey questionnaire was developed specifically for the study through focus group discussions and a literature review. The study was conducted as a cross-sectional anonymous survey of private general practitioners practicing in Singapore. The survey contained questions on their experience and training needs in assessing and treating patients with intellectual disability. Forty-nine of the 272 questionnaires sent out were returned. The respondents were predominantly male general practitioners working in "solo" practices. For most general practitioners, the proportion of patients with intellectual disability ranged from 1% to 5%. Nearly 90% of general practitioners identified problems in communicating with such patients as an important barrier that affected the quality of assessment of their health conditions. Other barriers identified were behavioral issues and sensory impairments. Only one-third of the general practitioners were confident that they had sufficient knowledge of physical and mental health conditions related to patients with intellectual disability. Three-fourths of the general practitioners believed that further training in this area would be beneficial. Appropriate interventions to address barriers in assessment and management of patients with intellectual disability with further training for general practitioners may improve the standard of healthcare provided to this population group.

  15. Making Risk Management Strategic

    DEFF Research Database (Denmark)

    Sax, Johanna; Andersen, Torben Juul

    2018-01-01

    Enterprise risk management (ERM) is an established management practice and is increasing in prominence as more firms spend substantial resources implementing ERM frameworks, partially induced by regulatory requirements. Yet, there is a lack of knowledge as to whether such frameworks add value and...... outcomes. The study develops a new multidimensional measure of adherence to ERM practices where earlier studies typically have relied on dichotomous proxies. We discuss the implications of these findings for ERM practice and strategic management in general....

  16. Using hormones to manage dairy cow fertility: the clinical and ethical beliefs of veterinary practitioners.

    Science.gov (United States)

    Higgins, Helen M; Ferguson, Eamonn; Smith, Robert F; Green, Martin J

    2013-01-01

    In the face of a steady decline in dairy cow fertility over several decades, using hormones to assist reproduction has become common. In the European Union, hormones are prescription-only medicines, giving veterinary practitioners a central role in their deployment. This study explored the clinical and ethical beliefs of practitioners, and provides data on their current prescribing practices. During 2011, 93 practitioners working in England completed a questionnaire (95% response rate). Of the 714 non-organic farms they attended, only 4 farms (0.6%) never used hormones to assist the insemination of lactating dairy cows. Practitioners agreed (>80%) that hormones improve fertility and farm businesses profitability. They also agreed (>80%) that if farmers are able to tackle management issues contributing to poor oestrus expression, then over a five year period these outcomes would both improve, relative to using hormones instead. If management issues are addressed instead of prescribing hormones, practitioners envisaged a less favourable outcome for veterinary practices profitability (p<0.01), but an improvement in genetic selection for fertility (p<0.01) and overall cow welfare (p<0.01). On farms making no efforts to address underlying management problems, long-term routine use at the start of breeding for timing artificial insemination or inducing oestrus was judged "unacceptable" by 69% and 48% of practitioners, respectively. In contrast, practitioners agreed (≥ 90%) that both these types of use are acceptable, provided a period of time has been allowed to elapse during which the cow is observed for natural oestrus. Issues discussed include: weighing quality versus length of cow life, fiscal factors, legal obligations, and balancing the interests of all stakeholders, including the increasing societal demand for food. This research fosters debate and critical appraisal, contributes to veterinary ethics, and encourages the pro-active development of professional

  17. Using hormones to manage dairy cow fertility: the clinical and ethical beliefs of veterinary practitioners.

    Directory of Open Access Journals (Sweden)

    Helen M Higgins

    Full Text Available In the face of a steady decline in dairy cow fertility over several decades, using hormones to assist reproduction has become common. In the European Union, hormones are prescription-only medicines, giving veterinary practitioners a central role in their deployment. This study explored the clinical and ethical beliefs of practitioners, and provides data on their current prescribing practices. During 2011, 93 practitioners working in England completed a questionnaire (95% response rate. Of the 714 non-organic farms they attended, only 4 farms (0.6% never used hormones to assist the insemination of lactating dairy cows. Practitioners agreed (>80% that hormones improve fertility and farm businesses profitability. They also agreed (>80% that if farmers are able to tackle management issues contributing to poor oestrus expression, then over a five year period these outcomes would both improve, relative to using hormones instead. If management issues are addressed instead of prescribing hormones, practitioners envisaged a less favourable outcome for veterinary practices profitability (p<0.01, but an improvement in genetic selection for fertility (p<0.01 and overall cow welfare (p<0.01. On farms making no efforts to address underlying management problems, long-term routine use at the start of breeding for timing artificial insemination or inducing oestrus was judged "unacceptable" by 69% and 48% of practitioners, respectively. In contrast, practitioners agreed (≥ 90% that both these types of use are acceptable, provided a period of time has been allowed to elapse during which the cow is observed for natural oestrus. Issues discussed include: weighing quality versus length of cow life, fiscal factors, legal obligations, and balancing the interests of all stakeholders, including the increasing societal demand for food. This research fosters debate and critical appraisal, contributes to veterinary ethics, and encourages the pro-active development of

  18. Governmental management of chemical risk

    International Nuclear Information System (INIS)

    Zimmerman, R.

    1990-01-01

    This book is organized under the following headings: risk management in the government context; legal and regulatory decrees and directives for managing chemical risk; incentive-based approaches for regulating risk; risk management in the federal system; and traditional approaches and new initiatives for managing chemical risk

  19. Risk management versus incentives

    International Nuclear Information System (INIS)

    Aven, E.; Lovas, K.; Osmundsen, P.

    2006-01-01

    Portfolio theory indicates that risk management should take place at the group level. Hedging at the project level or in the individual business areas may lead to suboptimal results. However, the efficiency of a profit centre depends on its management's being able to influence factors that are crucial to the unit's financial results. Price hedging could be one such factor. In the wider perspective, this constitutes part of the balancing between centralisation and decentralisation. This article covers important elements of risk management and incentive design. It goes on to discuss the balancing of overall risk management at the group level and incentive design in profit centres and corporate units. Throughout the article, the oil industry serves as a case. (author)

  20. Risk management guide

    International Nuclear Information System (INIS)

    Briscoe, G.J.

    1977-06-01

    Risk management requires an assessment or a knowledge of risk. This, in turn, requires identification of hazards (sources of risk) and a determination of risk (evaluation of the hazard degree). The hazard identification and risk analysis techniques presented in this Guide are, in general, based on the MORT concept that accidents result from unwanted energy flow in the absence of adequate controls and/or barriers. This Guide presents an analytical tree designed to prevent oversight of specific energy sources in risk identification. Hazard identification by field personnel is also discussed. Quantitative risk analysis is discussed in the following section. A method for summary of the risks for each energy classification is given. This method uses a graphical log-normal projection so that low probability events, which are not adequately represented in the experience data, are included in the risk assessment. This permits a more acceptable risk assessment since catastrophes are not ignored, even though the actual risk is only approximated. In addition, a few examples of risk analysis of specific hazards are given. Rudimentary probability and fault tree theory are used in these examples. Total risk assessment and resource allocation and safety performance trend analysis are discussed

  1. Transforming Education through Total Quality Management: A Practitioner's Guide.

    Science.gov (United States)

    Schargel, Franklin P.

    This book illustrates how one school, George Westinghouse Vocational and Technical High School (Brooklyn, New York), has been applying the techniques of total quality management (TQM) to achieve educational change. Following the foreword and introduction, chapter 1 describes TQM, Deming's 14 points, and the challenges of applying TQM to education.…

  2. Greening Operations Management: An Online Sustainable Procurement Course for Practitioners

    Science.gov (United States)

    Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian

    2009-01-01

    In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…

  3. Managing Risk and Opportunity

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Garvey, Maxine; Roggi, Oliviero

    outcomes. This topic is timely and of interest both to the academic community as well as to practicing managers, executives, and directors. The volume focuses on contemporary risk leadership issues based on recent research insights but avoids excessive technical language and mathematical formulas. The book...... is framed around the challenges imposed on executives and directors in dealing with an increasingly complex and unpredictable world. This requires a new risk leadership focus that not only avoids the downside risks but also considers ways to exploit the upside potential offered by a dynamic environment....... The underlying logic is built on the principles of financial economics where benefits derive from reducing bankruptcy costs and increasing future cash inflows. This provides a stringent framework for analyzing the effect of different risk management actions and behaviors in effective risk-taking organizations...

  4. Air quality risk management.

    Science.gov (United States)

    Williams, Martin L

    2008-01-01

    Rather than attempt to provide a comprehensive account of air quality risk assessment, as might be found in a textbook or manual, this article discusses some issues that are of current importance in the United Kingdom and the rest of Europe, with special emphasis on risk assessment in the context of policy formulation, and emerging scientific knowledge. There are two pollutants of particular concern and that both pose challenges for risk assessment and policy, and they are particulate matter (PM) and ozone. The article describes some issues for health risk assessment and finally some forward-looking suggestions for future approaches to air quality management.

  5. Managing power risk

    International Nuclear Information System (INIS)

    Rudd, D.C.

    1999-01-01

    Issues regarding the management of financial risks in the electric power market were discussed. The nature of the risk was defined for electricity producers, local utilities, traders/dealers, and brokers, each of which are exposed to different types of risks with the exception of credit risk, which is common to all. The main features of options, swaps, CFDs, bilateral financial contracts, futures contracts and the terms of the NYMEX electricity contract were outlined. Basic derivative strategies, the role of the broker, the elements of emissions trading, and trading strategies for consumers were also explained. 3 fig

  6. Attitudes to diagnosis and management in dementia care: views of future general practitioners.

    Science.gov (United States)

    Tang, Eugene Yee Hing; Birdi, Ratika; Robinson, Louise

    2018-03-01

    ABSTRACTConsiderable international governmental support is focused on the timely diagnosis of dementia and post-diagnostic care of people with dementia. Identifying those at high risk of dementia is one approach to timely diagnosis. General practitioners (GPs) are well-placed clinicians in the community to provide both pre- and post-diagnostic dementia care. However, GPs have in the past consistently demonstrated low confidence in both diagnosing dementia and providing care for these complex patients particularly for patients in the post-diagnostic phase. It is currently unclear how future GPs view dementia care. We aimed to evaluate the current attitudes and experiences of future GPs in dementia care and their views on targeting high risk groups. All (n = 513) GP trainees were approached by email to participate in a cross-sectional web and paper-based survey in the North of England. A further reminder was sent out two months after the initial invitation. We received 153 responses (29.8% response rate, 66.7% female, average age 31 (range 25-55 years old). The main difficulties encountered included coordinating supporting services for carers and the person with dementia and responding to co-existing behavioral and psychiatric symptoms. Further education in dementia management was considered to be important by respondents. GP trainees were generally very positive about their future role in caring for people with dementia, particularly in the area of earlier diagnosis via identification of high-risk individuals. Future GPs in one area of England are very positive about their key role in dementia care. In order to facilitate the delivery of high quality, community-based care, work is required to establish core post-diagnostic dementia support services. Further research is needed to identify effective systems to enable accurate assessment and to ensure earlier diagnosis in high-risk groups.

  7. Periodontal instrumentation for the general dental practitioner: Pt. 2. Management maintenance and sterilization

    Energy Technology Data Exchange (ETDEWEB)

    Touyz, L.Z.G. (University of the Witwatersrand, Johannesburg (South Africa). Dept. of Oral Medicine and Periodontology); De Waal, J.

    1983-03-01

    The purpose of this article is to describe the management, maintenance and sterilization of periodontal instrumentation used by the general dental practitioner. The pre-sterilization, decontamination and cleaning, the sharpening of instrumentation and the packaging, identification and grouping for sterilization are discussed. Attention is also given to various techniques of sterilization, including gamma radiation.

  8. Management of patients with epistaxis by general practitioners: impact of otolaryngology experience on their practice

    NARCIS (Netherlands)

    Tassone, Peter; Georgalas, Christos; Appleby, Esther; Kotecha, Bhik

    2006-01-01

    This study aims to assess the management of patients with epistaxis by general practitioners (GPs) and to show whether previous experience as a junior doctor in ear, nose and throat (ENT) surgery influences their practice. A questionnaire was sent together with self-addressed reply envelopes to a

  9. Management of radiation risk

    International Nuclear Information System (INIS)

    Hubert, P.

    1996-01-01

    The need to control the risk from ionizing radiation can be tracked back to the eve of the twentieth century. However, as knowledge improved and practices expanded, the approaches to this control have evolved. No longer is the mere respect of some forms of exposure limits or safety related standards sufficient. Rather, it is widely admitted that there is a need for managing radiation risk, both by balancing the advantages and disadvantages of enhancing protection and by setting up a proper organization that allows handling of the risk. This paper describes the multiple aspects of radiation risk management and points out the main related issues. It critically analyzes ALARA and ICRP recommendations. 74 refs, 8 figs, 5 tabs

  10. Looking Through a Social Lens: Conceptualising Social Aspects of Knowledge Management for Global Health Practitioners.

    Science.gov (United States)

    Limaye, Rupali J; Sullivan, Tara M; Dalessandro, Scott; Jenkins, Ann Hendrix

    2017-04-13

    Knowledge management plays a critical role in global health. Global health practitioners require knowledge in every aspect of their jobs, and in resource-scarce contexts, practitioners must be able to rely on a knowledge management system to access the latest research and practice to ensure the highest quality of care. However, we suggest that there is a gap in the way knowledge management is primarily utilized in global health, namely, the systematic incorporation of human and social factors. In this paper, we briefly outline the evolution of knowledge management and then propose a conceptualization of knowledge management that incorporates human and social factors for use within a global health context. Our conceptualization of social knowledge management recognizes the importance of social capital, social learning, social software and platforms, and social networks , all within the context of a larger social system and driven by social benefit . We then outline the limitations and discuss future directions of our conceptualization, and suggest how this new conceptualization is essential for any global health practitioner in the business of managing knowledge.

  11. Managing Chemical & Material Risks

    Science.gov (United States)

    2011-12-01

    Certification Program Acquisition, Technology and Logistics 9 DoD Hexavalent Chromium Risk Reduction Non- Chrome Primer II EXAVAJ ENT CHROM lrUMI...Royal Demolition eXplosive (RDX) • Cyclotrimethylenetrinitramine  Hexavalent Chromium (Cr6+) Naphthalene …pending downgrade to watch list Beryllium...T1me (secondo) 700 Acquisition, Technology and Logistics 10 Hexavalent Chromium Risk Management Actions • DoD minimization policy signed April

  12. Managing risk at Hanford

    International Nuclear Information System (INIS)

    Hesser, W.A.; Stillwell, W.G.; Rutherford, W.A.

    1994-01-01

    Clearly, there is sufficient motivation from Washington for the Hanford community to pay particular attention to the risks associated with the substantial volumes of radiological, hazardous, and mixed waste at Hanford. But there is also another reason for emphasizing risk: Hanford leaders have come to realize that their decisions must consider risk and risk reduction if those decisions are to be technically sound, financially affordable, and publicly acceptable. The 560-square miles of desert land is worth only a few thousand dollars an acre (if that) -- hardly enough to justify the almost two billion dollars that will be spent at Hanford this year. The benefit of cleaning up the Hanford Site is not the land but the reduction of potential risk to the public and the environment for future generations. If risk reduction is our ultimate goal, decisions about priority of effort and resource allocation must consider those risks, now and in the future. The purpose of this paper is to describe how Hanford is addressing the issues of risk assessment, risk management, and risk-based decision making and to share some of our experiences in these areas

  13. Enterprise risk management in international construction operations

    CERN Document Server

    Zhao, Xianbo; Low, Sui Pheng

    2015-01-01

    This book provides readers an understanding of the implementation of Enterprise Risk Management (ERM) for international construction operations. In an extended case study, it primarily focuses on Chinese construction firms (CCFs) based in Singapore. In this regard, the book explains the differences and similarities between Risk Management (RM), Project Risk Management (PRM) and ERM in the construction industry, and examines their linkages for international construction operations in a broader context. The explanation elaborates on how companies may adopt and implement RM, PRM and ERM as appropriate in their various operations, both in their home market as well as in overseas host markets. The book also reviews the whole spectrum of work relating to organizational behavior (OB) as one of the key underpinnings for companies to evaluate and implement ERM. It will benefit practitioners from the industry as well as academics interested in the implementation of ERM practices in international construction operat...

  14. Alternative medicine: an ethnographic study of how practitioners of Indian medical systems manage TB in Mumbai.

    Science.gov (United States)

    McDowell, Andrew; Pai, Madhukar

    2016-03-01

    Mumbai is a hot spot for drug-resistant TB, and private practitioners trained in AYUSH systems (Ayurveda, yoga, Unani, Siddha and homeopathy) are major healthcare providers. It is important to understand how AYUSH practitioners manage patients with TB or presumptive TB. We conducted semi-structured interviews of 175 Mumbai slum-based practitioners holding degrees in Ayurveda, homeopathy and Unani. Most providers gave multiple interviews. We observed 10 providers in clinical interactions, documenting: clinical examinations, symptoms, history taking, prescriptions and diagnostic tests. No practitioners exclusively used his or her system of training. The practice of biomedicine is frequent, with practitioners often using biomedical disease categories and diagnostics. The use of homeopathy was rare (only 4% of consultations with homeopaths resulted in homeopathic remedies) and Ayurveda rarer (3% of consultations). For TB, all mentioned chest x-ray while 31 (17.7%) mentioned sputum smear as a TB test. One hundred and sixty-four practitioners (93.7%) reported referring TB patients to a public hospital or chest physician. Eleven practitioners (6.3%) reported treating patients with TB. Nine (5.1%) reported treating patients with drug-susceptible TB with at least one second-line drug. Important sources of health care in Mumbai's slums, AYUSH physicians frequently use biomedical therapies and most refer patients with TB to chest physicians or the public sector. They are integral to TB care and control. © The Author 2016. Published by Oxford University Press on behalf of Royal Society of Tropical Medicine and Hygiene. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  15. Investigation of risk management auditing

    International Nuclear Information System (INIS)

    Cao Lu

    2012-01-01

    2004, COSO published 'Enterprise Risk Management Framework', 2009, SASAC issued the 'central enterprise-wide risk management guidelines' to promote risk management within the formal state-owned enterprises in medium and large. Nuclear Group, which risk management in all branches to carry out the project homeopathic, and A Ⅱ will carry out risk management program as the first unit has accumulated more experience. This article from the perspective of internal control, based on the company's risk management practices carried out to try for the nuclear power enterprise risk management audit to describe and propose new ideas. Which expounds the significance of risk management, audit, risk management audit of the ways and means, for practical application of risk management audit of a representative summary of the issues and the ways and means to solve the problem of forward-looking recommendations. (authors)

  16. Managing Risk and Opportunity

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Garvey, Maxine; Roggi, Oliviero

    outcomes. This topic is timely and of interest both to the academic community as well as to practicing managers, executives, and directors. The volume focuses on contemporary risk leadership issues based on recent research insights but avoids excessive technical language and mathematical formulas. The book...... is framed around the challenges imposed on executives and directors in dealing with an increasingly complex and unpredictable world. This requires a new risk leadership focus that not only avoids the downside risks but also considers ways to exploit the upside potential offered by a dynamic environment...

  17. Risk management in customs control

    OpenAIRE

    Drobot, Elena; Klevleeva, Aziza

    2016-01-01

    The particularities of risk-management system implementation within customs control are discussed in the article. The authors single out the elements of risk-management system, evaluate effectiveness of risk-management in customs control. The main reasons for non-implementation of risk-management system in customs control are described, as well. Particular attention is paid to the benefits of customs risk management.

  18. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  19. The Management Object in Risk Management Approaches

    DEFF Research Database (Denmark)

    Christiansen, Ulrik

    Using a systematic review of the last 55 years of research within risk management this paper explores how risk management as a management technology (methodologies, tools and frameworks to mitigate or manage risks) singles out risks as an object for management in order to make action possible....... The paper synthesise by developing a framework of how different views on risk management enable and constrain the knowledge about risk and thus frame the possibilities to measure, analyse and calculate uncertainty and risk. Inspired by social studies of finance and accounting, the paper finally develops...... three propositions that illustrate how the framing of risk establishes a boundary for how managers might understand value creation and the possible future and how this impacts the possible responses to risk....

  20. The Professionalization of Risk Management: What Role can the ISO 31000 Risk Management Principles Play?

    DEFF Research Database (Denmark)

    Olechowski, Alison; Oehmen, Josef; Seering, W.

    2016-01-01

    an empirical investigation and discussion of the eleven principles of the ISO 31000:2009 Risk Management Standard via a large-scale survey of engineering and product development practitioners. Adhering to the risk management principles at a high level was found to be a significant factor in better reaching......Risk management is increasingly seen as a means of improving the likelihood of success in complex engineering projects. Yet the presence of a legitimacy gap, driven by the lack of empirical validation of published best practices, might explain low adoption of risk management on projects. We present...... cost, schedule, technical and customer targets, in addition to achieving a more stable project execution. This finding suggests that, rather than a single rigid standard or an ever-changing set of detailed methods, the ISO principles have potential to be the basis for our shared understanding of best...

  1. Continuous Risk Management: An Overview

    Science.gov (United States)

    Rosenberg, Linda; Hammer, Theodore F.

    1999-01-01

    Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  2. Making sense of the future: The information search strategies of construction practitioners in exploring the risk landscape

    DEFF Research Database (Denmark)

    Stingl, Verena; Maytorena-Sanchez, Eunice

    This paper explores the cognitive strategies that construction practitioners rely on when searching to identify risks in a simulated project. By using the active information search methodology in interviews with 45 industry practitioners, we were able to distinguish three stereotypical information...

  3. Ethics and risk management in administrative child and adolescent psychiatry.

    Science.gov (United States)

    Sondheimer, Adrian

    2010-01-01

    This article examines ethics (the philosophic study of "doing the right thing") and risk management (the practice that seeks to manage the likelihood of "doing the wrong thing") and the relationship between them in the context of administrative child and adolescent psychiatry. Issues that affect child and adolescent psychiatrists who manage staff and business units and clinical practitioners who treat and manage individual patients are addressed. Malpractice, budgeting, credentialing, boundaries, assessment, documentation, treatment, research, dangerousness, and confidentiality are among the topics reviewed.

  4. Oral complementary medicine and alternative practitioner use varies across chronic conditions and attitudes to risk

    Directory of Open Access Journals (Sweden)

    Robert J Adams

    2010-11-01

    Full Text Available Robert J Adams1, Sarah L Appleton1, Antonia Cole2, Tiffany K Gill3, Anne W Taylor3, Catherine L Hill11The Health Observatory, 2Rheumatology Unit, 3Population Research and Outcomes Unit, SA Health, The University of Adelaide Discipline of Medicine, Queen Elizabeth Hospital, Woodville, AustraliaObjectives: To determine whether chronic conditions and patient factors, such as risk perception and decision-making preferences, are associated with complementary medicine and alternative practitioner use in a representative longitudinal population cohort.Participants and setting: Analysis of data from Stage 2 of the North West Adelaide Health Study of 3161 adults who attended a study clinic visit in 2004–2006. The main outcome measures were the medications brought by participants to the study clinic visit, chronic health conditions, attitudes to risk, levels of satisfaction with conventional medicine, and preferred decision-making style.Results: At least one oral complementary medicine was used by 27.9% of participants, and 7.3% were visiting alternative practitioners (naturopath, osteopath. Oral complementary medicine use was significantly associated with arthritis, osteoporosis, and mental health conditions, but not with other chronic conditions. Any pattern of complementary medicine use was generally significantly associated with female gender, age at least 45 years, patient-driven decision-making preferences (odds ratio [OR] 1.38, 95% confidence interval [CI]: 1.08–1.77, and frequent general practitioner visits (>five per year; OR 3.62, 95% CI: 2.13–6.17. Alternative practitioner visitors were younger, with higher levels of education (diploma/trade [OR 1.88, 95% CI: 1.28–2.76], bachelor’s degree [OR 1.77, 95% CI: 1.11–2.82], income > $80,000 (OR 2.28, 95% CI: 1.26–4.11, female gender (OR 3.15, 95% CI: 2.19–4.52, joint pain not diagnosed as arthritis (OR 1.68, 95% CI: 1.17–2.41, moderate to severe depressive symptoms (OR 2.15, 95% CI

  5. Oral complementary medicine and alternative practitioner use varies across chronic conditions and attitudes to risk.

    Science.gov (United States)

    Adams, Robert J; Appleton, Sarah L; Cole, Antonia; Gill, Tiffany K; Taylor, Anne W; Hill, Catherine L

    2010-11-08

    To determine whether chronic conditions and patient factors, such as risk perception and decision-making preferences, are associated with complementary medicine and alternative practitioner use in a representative longitudinal population cohort. Analysis of data from Stage 2 of the North West Adelaide Health Study of 3161 adults who attended a study clinic visit in 2004-2006. The main outcome measures were the medications brought by participants to the study clinic visit, chronic health conditions, attitudes to risk, levels of satisfaction with conventional medicine, and preferred decision-making style. At least one oral complementary medicine was used by 27.9% of participants, and 7.3% were visiting alternative practitioners (naturopath, osteopath). Oral complementary medicine use was significantly associated with arthritis, osteoporosis, and mental health conditions, but not with other chronic conditions. Any pattern of complementary medicine use was generally significantly associated with female gender, age at least 45 years, patient-driven decision-making preferences (odds ratio [OR] 1.38, 95% confidence interval [CI]: 1.08-1.77), and frequent general practitioner visits (>five per year; OR 3.62, 95% CI: 2.13-6.17). Alternative practitioner visitors were younger, with higher levels of education (diploma/trade [OR 1.88, 95% CI: 1.28-2.76], bachelor's degree [OR 1.77, 95% CI: 1.11-2.82], income >$80,000 (OR 2.28, 95% CI: 1.26-4.11), female gender (OR 3.15, 95% CI: 2.19-4.52), joint pain not diagnosed as arthritis (OR 1.68, 95% CI: 1.17-2.41), moderate to severe depressive symptoms (OR 2.15, 95% CI: 1.04-4.46), and risk-taking behavior (3.26, 1.80-5.92), or low-to-moderate risk aversion (OR 2.08, 95% CI: 1.26-4.11). Although there is widespread use of complementary medicines in the Australian community, there are differing patterns of use between those using oral complementary medicines and those using alternative practitioners.

  6. Information Risk Management and Resilience

    Science.gov (United States)

    Dynes, Scott

    Are the levels of information risk management efforts within and between firms correlated with the resilience of the firms to information disruptions? This paper examines the question by considering the results of field studies of information risk management practices at organizations and in supply chains. The organizations investigated differ greatly in the degree of coupling from a general and information risk management standpoint, as well as in the levels of internal awareness and activity regarding information risk management. The comparison of the levels of information risk management in the firms and their actual or inferred resilience indicates that a formal information risk management approach is not necessary for resilience in certain sectors.

  7. Nuclear risk management

    International Nuclear Information System (INIS)

    2001-01-01

    This paper gives the list of contributions to Eurosafe 2001 which was organised around two round tables on the first day and five seminars on the second day. The first round table dealt with the technical, organisational and societal aspects of risk management aimed at the prevention of accidents in nuclear power plants. The second round table focused on radiological risks from the normal operation of nuclear installations. Special consideration has been given to the involvement of stakeholders. The five seminars were held in order to provide opportunities for comparing experiences and learning about recent activities of IRSN, GRS and their partners in the European Union and Eastern Europe: - Safety assessment and analysis of nuclear installations; -Nuclear safety research; -Environment and radiation protection; - Waste management; - Nuclear material security. (author)

  8. Nuclear risk management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This paper gives the list of contributions to Eurosafe 2001 which was organised around two round tables on the first day and five seminars on the second day. The first round table dealt with the technical, organisational and societal aspects of risk management aimed at the prevention of accidents in nuclear power plants. The second round table focused on radiological risks from the normal operation of nuclear installations. Special consideration has been given to the involvement of stakeholders. The five seminars were held in order to provide opportunities for comparing experiences and learning about recent activities of IRSN, GRS and their partners in the European Union and Eastern Europe: - Safety assessment and analysis of nuclear installations; -Nuclear safety research; -Environment and radiation protection; - Waste management; - Nuclear material security. (author)

  9. Credit risk management in banks

    OpenAIRE

    Pětníková, Tereza

    2014-01-01

    The subject of this diploma thesis is managing credit risk in banks, as the most significant risk faced by banks. The aim of this work is to define the basic techniques, tools and methods that are used by banks to manage credit risk. The first part of this work focuses on defining these procedures and describes the entire process of credit risk management, from the definition of credit risk, describing credit strategy and policy, organizational structure, defining the most used credit risk mi...

  10. Current Chemical Risk Management Activities

    Science.gov (United States)

    EPA's existing chemicals programs address pollution prevention, risk assessment, hazard and exposure assessment and/or characterization, and risk management for chemicals substances in commercial use.

  11. Managing Complex Environmental Risks

    Energy Technology Data Exchange (ETDEWEB)

    Karlsson, Mikael [Karlstad Univ. (Sweden). Dept. of Environmental Sciences

    2006-09-15

    Environmental and public health risks are often handled in a process in which experts, and sometimes policy makers, try their best to quantitatively assess, evaluate and manage risks. This approach harmonises with mainstream interpretations of sustainable development, which aim at defining a desirable relationship between human and natural systems, for instance by policies that define limit values of different forms of disturbances. However, under conditions of high scientific incertitude, diverging values and distrust, this approach is far from satisfactory. The use of cell phones, hazardous chemicals, nuclear or fossil energy systems, and modern biotechnology are examples of activities causing such risks with high complexity. Against this background, a complementary interpretation of the concept of sustainable development is suggested. This interpretation is operationalised through new formulations of three common principles for public risk management; the precautionary principle, the polluter pays principle and the principle of public participation. Implementation of these reformulated principles would challenge some foundations of present mainstream views on environmental decision-making, but would on the other hand contribute to improved practices for long-term human welfare and planetary survival (full text of contribution)

  12. Managing Complex Environmental Risks

    International Nuclear Information System (INIS)

    Karlsson, Mikael

    2006-01-01

    Environmental and public health risks are often handled in a process in which experts, and sometimes policy makers, try their best to quantitatively assess, evaluate and manage risks. This approach harmonises with mainstream interpretations of sustainable development, which aim at defining a desirable relationship between human and natural systems, for instance by policies that define limit values of different forms of disturbances. However, under conditions of high scientific incertitude, diverging values and distrust, this approach is far from satisfactory. The use of cell phones, hazardous chemicals, nuclear or fossil energy systems, and modern biotechnology are examples of activities causing such risks with high complexity. Against this background, a complementary interpretation of the concept of sustainable development is suggested. This interpretation is operationalised through new formulations of three common principles for public risk management; the precautionary principle, the polluter pays principle and the principle of public participation. Implementation of these reformulated principles would challenge some foundations of present mainstream views on environmental decision-making, but would on the other hand contribute to improved practices for long-term human welfare and planetary survival (full text of contribution)

  13. The effectiveness of a nurse practitioner-led pain management team in long-term care: A mixed methods study.

    Science.gov (United States)

    Kaasalainen, Sharon; Wickson-Griffiths, Abigail; Akhtar-Danesh, Noori; Brazil, Kevin; Donald, Faith; Martin-Misener, Ruth; DiCenso, Alba; Hadjistavropoulos, Thomas; Dolovich, Lisa

    2016-10-01

    Considering the high rates of pain as well as its under-management in long-term care (LTC) settings, research is needed to explore innovations in pain management that take into account limited resource realities. It has been suggested that nurse practitioners, working within an inter-professional model, could potentially address the under-management of pain in LTC. This study evaluated the effectiveness of implementing a nurse practitioner-led, inter-professional pain management team in LTC in improving (a) pain-related resident outcomes; (b) clinical practice behaviours (e.g., documentation of pain assessments, use of non-pharmacological and pharmacological interventions); and, (c) quality of pain medication prescribing practices. A mixed method design was used to evaluate a nurse practitioner-led pain management team, including both a quantitative and qualitative component. Using a controlled before-after study, six LTC homes were allocated to one of three groups: 1) a nurse practitioner-led pain team (full intervention); 2) nurse practitioner but no pain management team (partial intervention); or, 3) no nurse practitioner, no pain management team (control group). In total, 345 LTC residents were recruited to participate in the study; 139 residents for the full intervention group, 108 for the partial intervention group, and 98 residents for the control group. Data was collected in Canada from 2010 to 2012. Implementing a nurse practitioner-led pain team in LTC significantly reduced residents' pain and improved functional status compared to usual care without access to a nurse practitioner. Positive changes in clinical practice behaviours (e.g., assessing pain, developing care plans related to pain management, documenting effectiveness of pain interventions) occurred over the intervention period for both the nurse practitioner-led pain team and nurse practitioner-only groups; these changes did not occur to the same extent, if at all, in the control group

  14. Communicating cardiovascular disease risk: an interview study of General Practitioners' use of absolute risk within tailored communication strategies.

    Science.gov (United States)

    Bonner, Carissa; Jansen, Jesse; McKinn, Shannon; Irwig, Les; Doust, Jenny; Glasziou, Paul; McCaffery, Kirsten

    2014-05-29

    Cardiovascular disease (CVD) prevention guidelines encourage assessment of absolute CVD risk - the probability of a CVD event within a fixed time period, based on the most predictive risk factors. However, few General Practitioners (GPs) use absolute CVD risk consistently, and communication difficulties have been identified as a barrier to changing practice. This study aimed to explore GPs' descriptions of their CVD risk communication strategies, including the role of absolute risk. Semi-structured interviews were conducted with a purposive sample of 25 GPs in New South Wales, Australia. Transcribed audio-recordings were thematically coded, using the Framework Analysis method to ensure rigour. GPs used absolute CVD risk within three different communication strategies: 'positive', 'scare tactic', and 'indirect'. A 'positive' strategy, which aimed to reassure and motivate, was used for patients with low risk, determination to change lifestyle, and some concern about CVD risk. Absolute risk was used to show how they could reduce risk. A 'scare tactic' strategy was used for patients with high risk, lack of motivation, and a dismissive attitude. Absolute risk was used to 'scare' them into taking action. An 'indirect' strategy, where CVD risk was not the main focus, was used for patients with low risk but some lifestyle risk factors, high anxiety, high resistance to change, or difficulty understanding probabilities. Non-quantitative absolute risk formats were found to be helpful in these situations. This study demonstrated how GPs use three different communication strategies to address the issue of CVD risk, depending on their perception of patient risk, motivation and anxiety. Absolute risk played a different role within each strategy. Providing GPs with alternative ways of explaining absolute risk, in order to achieve different communication aims, may improve their use of absolute CVD risk assessment in practice.

  15. CEA - 2014 risk management assessment

    International Nuclear Information System (INIS)

    Bonnevie, Edwige; Verwaerde, Daniel; Maillot, Bernard

    2015-06-01

    After introducing presentations of CEA managers in charge of risk management and controls, this document presents and comments the actions undertaken by the CEA and the obtained results in terms of risk management in different fields: protection and control of the environment, installation safety, health, safety and radiation protection, transport of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of legal risks, internal audits and controls. Other topics are addressed like the presentation of the risk management department, and the role of the CEA in the relationship between research and industry

  16. CEA: risk management assessment 2011

    International Nuclear Information System (INIS)

    Bigot, Bernard; Bonnevie, Edwige; Maillot, Bernard

    2012-01-01

    This report proposes a qualitative and quantitative overview of CEA activities in the field of risk management during 2011. These activities concerned the impact on the environment, the safety of installations, the management of professional risks (safety and health at work), the radiological protection of workers, the transports of hazardous materials, waste management, protection of sites, installations and heritage, the management of emergency situations, the management of law risks, controls and audits

  17. Supply Chain Risk Management: A Conceptual Framework and Empirical Validation

    OpenAIRE

    Sumeet Gupta; Mark Goh; Robert De-Souza; Fanwen Meng; Miti Garg

    2014-01-01

    Increasing globalization of the supply chains is making them increasingly vulnerable to various supply chain risks. Effective management of these risks is essential to prevent minor as well as major risks that may occur in day-to-day operations of the firm. In this paper an attempt is made to bring out a schema for analyzing supply chain risks faced by the firm and develop a risk management action framework that would serve as a guide for practitioners to identify the level at which their fir...

  18. Bridging the gap: academic and practitioner perspectives to identify early career competencies needed in healthcare management.

    Science.gov (United States)

    Shewchuk, Richard M; O'Connor, Stephen J; Fine, David J

    2006-01-01

    Healthcare organizations, health management professional associations, and educational institutions have begun to examine carefully what it means to be a fully competent healthcare executive. As a result, an upsurge in interest in healthcare management competencies has been observed recently. The present study uses two critically important groups of informants as participants: health management practitioners and faculty. Using the nominal group process, health administrators identified critical environmental issues perceived to have an impact on healthcare executives today. These issues were employed in a card-sort assessment and a survey was administered to a nationwide sample of health administrators. These data were used to create a map and five clusters of the environmental landscape of healthcare management. These clusters of environmental issues provided a framework for having groups of administrators and faculty members generate and rank perceived behavioral competencies relative to each cluster. Implications for healthcare management practice, education, and research are discussed.

  19. Information Risk Management: Qualitative or Quantitative? Cross industry lessons from medical and financial fields

    OpenAIRE

    Upasna Saluja; Norbik Bashah Idris

    2012-01-01

    Enterprises across the world are taking a hard look at their risk management practices. A number of qualitative and quantitative models and approaches are employed by risk practitioners to keep risk under check. As a norm most organizations end up choosing the more flexible, easier to deploy and customize qualitative models of risk assessment. In practice one sees that such models often call upon the practitioners to make qualitative judgments on a relative rating scale which brings in consid...

  20. Risk Management in Cocurricular Activities.

    Science.gov (United States)

    Webb, Edward M.

    1988-01-01

    Discusses risk management for colleges' cocurricular activities. Discusses tort liability, contributory negligence, and assumption of risk. Provides six concrete steps for managing risks responsibly and professionally: adopting an educational mission statement, assigning risk to others, establishing safety standards, training club advisors,…

  1. Managing Corruption Risks

    DEFF Research Database (Denmark)

    Krause Hansen, Hans

    2011-01-01

    This article investigates the emerging engagement of private actors and specifically Western corporations in international anti-corruption, drawing on Foucauldian studies of governmentality. It explores this engagement as governing practices that have emanated quite independently from the inter......-state system commonly understood to be at the core of the anti-corruption regime. It demonstrates how corporate anti-corruption ties in with a relatively new way of perceiving corruption. In this framing, anti-corruption comes out as risk management, which is latched on to notions of corporate social...... responsibility and business ethics. Moreover, the constitution of corruption risk relates to the rise of new actors and networks engaged in a wider business of anti-corruption, including commercial and hybrid actors that supply corporations with managerial instruments, benchmarks for best practice, rankings...

  2. INTERNAL AUDIT AND RISK MANAGEMENT

    OpenAIRE

    Elena RUSE; Georgiana SUSMANSCHI (BADEA); Daniel DĂNECI-PĂTRĂU

    2014-01-01

    The existence of risk in economic activity can not be denied. In fact, the risk is a concept which exists in every activity, the term of risk being identified with uncertainty, respectively the (un)chance to produce an undesirable event. Internal audit and risk management aim at the same goal, namely the control of risks. Internal Audit performs several roles in risk management plan. The objectives of the internal audit function varies from company to company, but in all economic entities int...

  3. Managing Climate Change Risks

    Energy Technology Data Exchange (ETDEWEB)

    Jones, R. [CSIRO Atmospheric Research, PMB1 Aspendale, Victoria 3195 (Australia)

    2003-07-01

    Issues of uncertainty, scale and delay between action and response mean that 'dangerous' climate change is best managed within a risk assessment framework that evolves as new information is gathered. Risk can be broadly defined as the combination of likelihood and consequence; the latter measured as vulnerability to greenhouse-induced climate change. The most robust way to assess climate change damages in a probabilistic framework is as the likelihood of critical threshold exceedance. Because vulnerability is dominated by local factors, global vulnerability is the aggregation of many local impacts being forced beyond their coping ranges. Several case studies, generic sea level rise and temperature, coral bleaching on the Great Barrier Reef and water supply in an Australian catchment, are used to show how local risk assessments can be assessed then expressed as a function of global warming. Impacts treated thus can be aggregated to assess global risks consistent with Article 2 of the UNFCCC. A 'proof of concept' example is then used to show how the stabilisation of greenhouse gases can constrain the likelihood of exceeding critical thresholds at both the both local and global scale. This analysis suggests that even if the costs of reducing greenhouse gas emissions and the benefits of avoiding climate damages can be estimated, the likelihood of being able to meet a cost-benefit target is limited by both physical and socio-economic uncertainties. In terms of managing climate change risks, adaptation will be most effective at reducing vulnerability likely to occur at low levels of warming. Successive efforts to mitigate greenhouse gases will reduce the likelihood of reaching levels of global warming from the top down, with the highest potential temperatures being avoided first, irrespective of contributing scientific uncertainties. This implies that the first cuts in emissions will always produce the largest economic benefits in terms of avoided

  4. Communicating Risk to Program Managers

    Science.gov (United States)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  5. Cross-sectional survey: risk-averse French general practitioners are more favorable toward influenza vaccination.

    Science.gov (United States)

    Massin, Sophie; Ventelou, Bruno; Nebout, Antoine; Verger, Pierre; Pulcini, Céline

    2015-01-29

    We tested the following hypotheses: (i) risk-averse general practitioners (GPs) are more likely to be vaccinated against influenza; (ii) and risk-averse GPs recommend influenza vaccination more often to their patients. In risk-averse GPs, the perceived benefits of the vaccine and/or the perceived risks of the infectious disease might indeed outweigh the perceived risks of the vaccine. In 2010-2012, we conducted a cross-sectional survey of a nationwide French representative sample of 1136 GPs. Multivariate analyses adjusted for four stratification variables (age, gender, urban/suburban/rural practice location and annual patient consultations) and for GPs' characteristics (group/solo practice, and occasional practice of alternative medicine, e.g., homeopathy) looked for associations between their risk attitudes and self-reported vaccination behavior. Individual risk attitudes were expressed as a continuous variable, from 0 (risk-tolerant) to 10 (risk-averse). Overall, 69% of GPs reported that they were very favorable toward vaccination in general. Self-reported vaccination coverage was 78% for 2009/2010 seasonal influenza and 62% for A/H1N1 pandemic influenza. Most GPs (72%) reported recommending the pandemic influenza vaccination to at-risk young adults in 2009, but few than half (42%) to young adults not at risk. In multivariate analyses, risk-averse GPs were more often vaccinated against seasonal (marginal effect=1.3%, P=0.02) and pandemic influenza (marginal effect=1.5%, P=0.02). Risk-averse GPs recommended the pandemic influenza vaccination more often than their more risk-tolerant colleagues to patients without risk factors (marginal effect=1.7%, P=0.01), but not to their at-risk patients and were more favorable toward vaccination in general (marginal effect=1.5%, P=0.04). Individual risk attitudes may influence GPs' practices regarding influenza vaccination, both for themselves and their patients. Our results suggest that risk-averse GPs may perceive the risks

  6. Occupational Therapy Practitioners with Occupational Musculoskeletal Injuries: Prevalence and Risk Factors.

    Science.gov (United States)

    Alnaser, Musaed Z

    2015-12-01

    The purpose of this study was to examine the prevalence and risk factors of occupational musculoskeletal injuries (OMIs) among occupational therapy practitioners over a 12-month period. A self-administered questionnaire mailed to 500 randomly selected practicing occupational therapists (OTs) and occupational therapy assistants (OTAs) living in the state of Texas. A response rate of 38 % was attained with 192 questionnaires returned. In a 12-months working period, 23 % of occupational therapy practitioners experienced musculoskeletal injuries. Muscle strain (52 %) was most reported injury and lower back (32 %) was most injured body part. Years of practicing experience (t = 2.83, p = 0.01), and age x(2)(2, N = 192) = 8.28, p = 0.02 were found as significant factors associated with injuries among OTAs. No factors were significantly associated with injuries among OTs. Patient handling was the primary factor associated with injuries. Also, minimal experience and older age were concluded as risk factors that might contribute to OMIs.

  7. Managing information technology security risk

    Science.gov (United States)

    Gilliam, David

    2003-01-01

    Information Technology (IT) Security Risk Management is a critical task for the organization to protect against the loss of confidentiality, integrity and availability of IT resources. As systems bgecome more complex and diverse and and attacks from intrusions and malicious content increase, it is becoming increasingly difficult to manage IT security risk. This paper describes a two-pronged approach in addressing IT security risk and risk management in the organization: 1) an institutional enterprise appraoch, and 2) a project life cycle approach.

  8. Credit derivatives and risk management

    OpenAIRE

    Michael S. Gibson

    2007-01-01

    The striking growth of credit derivatives suggests that market participants find them to be useful tools for risk management. I illustrate the value of credit derivatives with three examples. A commercial bank can use credit derivatives to manage the risk of its loan portfolio. An investment bank can use credit derivatives to manage the risks it incurs when underwriting securities. An investor, such as an insurance company, asset manager, or hedge fund, can use credit derivatives to align its...

  9. What should medical practitioners know about the role of alternative medicines in cardiovascular disease management?

    Science.gov (United States)

    Whayne, Thomas F

    2010-04-01

    Alternative medications as a term call up many different meanings, significance, and perceptions to various medical practitioners. Some are good; others are bad. A wide range of alternative medications with relevance or connection to cardiovascular (CV) disease have been considered. While many are worthless, others have definite benefit, and at least one, chelation therapy, is associated with definite harm, significant risk, no benefit, and enrichment of the practitioners who prescribe it. The issues concerning alternative therapies will likely never be studied with randomized clinical trials due to the lack of a profit motive on the part of pharmaceutical companies--only rarely do other institutions, such as the National Institutes of Health, support medicinal studies. Basic knowledge of alternative therapies is essential for the CV specialist and other practicing physicians and other practitioners, since at least a few of their patients will take these medications regardless of medical advice. The result is that a number of these alternative medications will then interact with conventional CV medications, many times unfavorably.

  10. Managing the risks of a large-scale infrastructure project : The case of Spoorzone Delft

    NARCIS (Netherlands)

    Priemus, H.

    2012-01-01

    Risk management in large-scale infrastructure projects is attracting the attention of academics and practitioners alike. After a brief summary of the theoretical background, this paper describes how the risk analysis and risk management shaped up in a current large-scale infrastructure project in

  11. Job satisfaction and perceived autonomy for nurse practitioners working in nurse-managed health centers.

    Science.gov (United States)

    Pron, Ann Linguiti

    2013-04-01

    More primary care providers are needed to deliver health care to Americans living in poverty and those soon to be insured under the Affordable Care Act. Nurse practitioners (NPs) in nurse-managed health centers (NMHCs) are poised to meet this need. This research study examined the characteristics of NPs working in NMHCs and measured job satisfaction and perceived level of autonomy. No studies about job satisfaction or autonomy for NPs working in NMHCs had been previously reported. This descriptive, quantitative study surveyed primary care NPs working in NMHCs that are part of the National Nursing Centers Consortium (NNCC). NP e-mail addresses were obtained from NNCC center directors. Of 198 NPs invited to the electronic survey, 99 completed the Misener Nurse Practitioner Job Satisfaction Scale, demographic questionnaire, questions about perceived autonomy, and whether they would recommend working in an NMHC. Participants came from 16 states and 46 NMHCs. NPs working in NMHCs have job satisfaction, perceive their role as autonomous, and are satisfied with the autonomy they have. NMHCs can provide access to primary health care for many Americans. More NPs may choose employment in NMHCs for job satisfaction and autonomy. ©2012 The Author(s) Journal compilation ©2012 American Association of Nurse Practitioners.

  12. The Dunedin Dementia Risk Awareness Project: a convenience sample of general practitioners.

    Science.gov (United States)

    Barak, Yoram; Rapsey, Charlene; Fridman, Dana; Scott, Kate

    2018-05-04

    Recent recommendations of US and UK governmental and academic agencies suggest that up to 35% of dementia cases are preventable. We aimed to appraise general practitioners' (GPs) awareness of risk and protective factors associated with dementia and their intentions to act within the context of the Health Beliefs Model. We canvassed degree of dementia awareness, using the modified Lifestyle for Brain Health (LIBRA) scale among a convenience sample of local GPs. Thirty-five GPs, mean age 56.7 + 6.8 years (range: 43-72) participated. There were 19 women and 16 men, all New Zealand European. Genetics was the most commonly cited risk for dementia and exercise the most commonly cited protective factor. More than 80% of participants correctly identified 8/12 LIBRA factors. Factors not identified were: renal dysfunction, obesity, Mediterranean diet and high cognitive activity. The majority of participants felt they were at risk of suffering from dementia, that lifestyle changes will help reduce their risk and wished to start these changes soon. GPs are knowledgeable about dementia risk and protective factors. They reported optimism in their ability to modify their own risk factors through lifestyle interventions. This places GPs in a unique position to help disseminate this knowledge to their clients.

  13. The contribution of indigenous knowledge to disaster risk reduction activities in Zimbabwe: A big call to practitioners

    Directory of Open Access Journals (Sweden)

    Ernest Dube

    2018-03-01

    Full Text Available This article examined the contribution of indigenous knowledge to disaster risk reduction activities in Zimbabwe. The current discourse underrates the use of indigenous knowledge of communities by practitioners when dealing with disasters’, as the knowledge is often viewed as outdated and primitive. This study, which was conducted in 2016, sought to examine this problem through analysing the potential contribution of indigenous knowledge as a useful disaster risk reduction intervention. Tsholotsho district in Matabeleland, North province of Zimbabwe, which frequently experiences perennial devastating floods, was used as a case study. Interviews and researcher observations were used to gather data from 40 research participants. The findings were that communities understand weather patterns and could predict imminent flooding after studying trees and clouds, and the behaviours of certain animal species. Local communities also use available local resources to put structural measures in place as part of disaster risk reduction interventions. Despite this important potential, the study found that the indigenous knowledge of disaster risk reduction of the communities is often shunned by practitioners. The practitioners claim that indigenous knowledge lacks documentation, it is not found in all generational classes, it is contextualised to particular communities and the knowledge cannot be scientifically validated. The study concluded that both local communities and disaster risk reduction practitioners can benefit from the indigenous knowledge of communities. This research has the potential to benefit communities, policymakers and disaster risk reduction practitioners.

  14. The Key to Risk Management: Management

    OpenAIRE

    Adrian E. Tschoegl

    2000-01-01

    The Barings, Daiwa Bank and Sumitomo Corp. financial debacles in the mid-1990s suggest that management failures rather than misfortune, errors, or complexity are a major source of the risk of financial debacles. These errors are systematic and are a concommittant of the structure of trading and of human nature. Risk management systems must take these facts into account.

  15. Risk Management in Insurance Companies

    OpenAIRE

    Yang, Xufeng

    2006-01-01

    Insurance is the uncertain business in uncertain society. Today, insures face more complex and difficult risks. Efficient risk management mechanisms are essential for the insurers. The paper is set out initially to explore UK insurance companies risk management and risk disclosure by examining companies annual report after all the listed insurance companies are required to disclose risk information in their annual report, which seeks to reflect the recent development in UK insurance companies...

  16. Information systems for risk management

    OpenAIRE

    Michael S. Gibson

    1997-01-01

    Risk management information systems are designed to overcome the problem of aggregating data across diverse trading units. The design of an information system depends on the risk measurement methodology that a firm chooses. Inherent in the design of both a risk management information system and a risk measurement methodology is a tradeoff between the accuracy of the resulting measures of risk and the burden of computing them. Technical progress will make this tradeoff more favorable over time...

  17. Framework for systematic risk management

    International Nuclear Information System (INIS)

    Knief, R.A.; Mahn, J.A.; Briant, V.S.; Lee, R.B.; Long, R.L.

    1991-01-01

    The first paper of the Symposium described GPU Nuclear's Risk Management Group (RMG) and the use of literature search and interviews in a extensive study of risk management. One of the most important goals of the study was to identify comprehensive approaches to managing risk in the nuclear and major high-technology industries. This paper discusses RMG's multi-step generic risk-management process consisting of the following steps to: identify hazards; screen hazards and identify preventive actions, including costs; evaluate hazards for severity, probable frequency, and cost of preventive actions; prioritize preventive actions (preference to high risk and low cost); implement preventive actions; monitor and provide feedback

  18. Trends in risk management in nuclear industry

    International Nuclear Information System (INIS)

    Kim, Inn Seock

    1996-01-01

    Safety management may be classified into three dimensions: risk management, accident management, and emergency management. This paper addresses the recent trends of safety management in nuclear industry, focussing on risk management and accident management

  19. The 5As team intervention: bridging the knowledge gap in obesity management among primary care practitioners.

    Science.gov (United States)

    Ogunleye, Ayodele; Osunlana, Adedayo; Asselin, Jodie; Cave, Andrew; Sharma, Arya Mitra; Campbell-Scherer, Denise Lynn

    2015-12-22

    Despite opportunities for didactic education on obesity management, we still observe low rates of weight management visits in our primary care setting. This paper describes the co-creation by front-line interdisciplinary health care providers and researchers of the 5As Team intervention to improve obesity prevention and management in primary care. We describe the theoretical foundations, design, and core elements of the 5AsT intervention, and the process of eliciting practitioners' self-identified knowledge gaps to inform the curricula for the 5AsT intervention. Themes and topics were identified through facilitated group discussion and a curriculum relevant to this group of practitioners was developed and delivered in a series of 12 workshops. The research question and approach were co-created with the clinical leadership of the PCN; the PCN committed internal resources and a practice facilitator to the effort. Practice facilitation and learning collaboratives were used in the intervention For the content, front-line providers identified 43 topics, related to 13 themes around obesity assessment and management for which they felt the need for further education and training. These needs included: cultural identity and body image, emotional and mental health, motivation, setting goals, managing expectations, weight-bias, caregiver fatigue, clinic dynamics and team-based care, greater understanding of physiology and the use of a systematic framework for obesity assessment (the "4Ms" of obesity). The content of the 12 intervention sessions were designed based on these themes. There was a strong innovation values fit with the 5AsT intervention, and providers were more comfortable with obesity management following the intervention. The 5AsT intervention, including videos, resources and tools, has been compiled for use by clinical teams and is available online at http://www.obesitynetwork.ca/5As_Team . Primary care interdisciplinary practitioners perceive important

  20. Risk assessment and risk management in managed aquifer recharge

    CSIR Research Space (South Africa)

    Page, D

    2012-06-01

    Full Text Available This chapter presents the methodologies used for risk assessment and risk management in MAR in Australia and the European Union, qualitative and quantitative approaches adopted within the RECLAIM Water project and case studies where the outcomes...

  1. Understanding and managing risk attitude

    National Research Council Canada - National Science Library

    Hillson, David; Murray-Webster, Ruth

    2007-01-01

    ... This book highlights how risk attitude factors influence the human psyche, and carefully explains the impacts. Organisations seeking to dramatically improve the effectiveness of their risk management process will want to use this book's insights. Craig Peterson, President, PMI Risk Management SIG This book has prompted me to think more deeply as a change d...

  2. Resource effects of training general practitioners in risk communication skills and shared decision making competences.

    Science.gov (United States)

    Cohen, David; Longo, M F; Hood, Kerenza; Edwards, Adrian; Elwyn, Glyn

    2004-08-01

    Involving patients more in decisions about their own care requires doctors to be trained in effective ways of communicating information and in developing competences to negotiate levels of patient involvement which are most appropriate for each case. The aim of this study was to determine the cost of such training and identify which service resource variables are subsequently affected. An explanatory cluster randomized crossover trial was carried out which involved training general practitioners (GPs) in the use of risk communication (RC) tools, shared decision making (SDM) competences or both. Continuing care by GPs of patients with one of four chronic conditions (menopausal symptoms, menorrhagia, atrial fibrillation, prostatism) was reviewed before and after training. Cost of training was assessed by prospective monitoring of resources used. Data on prescribing, referrals and investigations were collected via questionnaires to participating practitioners. Data on follow-up GP consultations were extracted from medical records. Three two-level logistic models were performed to investigate the probability of training having an effect on prescribing, referrals and investigations ordered at the review consultation. Training cost pound 1218 per practitioner which increased the cost of a consultation by pound 2.89. Training in SDM or combined with RC significantly affected the probability of a prescription being issued to women with menopausal symptoms and menorrhagia (although RC on its own had no effect) but did not significantly affect prescribing for patients with prostatism or atrial fibrillation. It did not significantly affect the probability of investigations, referrals or follow-up GP visits for any of the conditions. Unless training has a major influence on consultation length, it is unlikely to have any major impacts on cost.

  3. Methods of Financial Risk Management

    Directory of Open Access Journals (Sweden)

    Korzh Natalia

    2016-10-01

    Full Text Available The essence and nature of financial risks are investigated. Their classification is conducted. The features of financial risk management and the main methods of management are considered. The ways of risk compensation are identified. It is proved that the objective external risk basis is such market imperfections as externalities of enterprises and incomplete information about the operation of the business environment and internal objective basis risk – the objective function to maximise profits in a competitive environment. It is revealed that to compensate market imperfections business entities should develop a strategy that combines fill in missing information and neutralise or minimise externalities that tactically implemented in financial risk management programs.

  4. Airway management by the general practitioner in trauma patients. Technical and non-technical skills

    Directory of Open Access Journals (Sweden)

    Juan David Dominguez-Sánchez

    2016-07-01

    Full Text Available General practitioners must constantly face challenges imposed by their profession when performing interventions that are necessary for their patients. Many of these interventions not only require proper use of theoretical knowledge, but also putting into practice non-technical and psychomotor skills developed through professional training. Given the specific characteristics of each patient, the clinical setting in the which procedure takes place and the limited skills of the professional, the management of the airway of a patient with trauma injuries in the emergency room represents a major challenge for physicians.

  5. IMPLEMENTING A RISK MANAGEMENT STANDARD

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2013-01-01

    Full Text Available After risk management “conquered” more and more project managers’ minds and showed its benefits for business and programs, the need to have a global risk management standard has become a crucial issue in the world of risk management. But having a global risk management standard has been a big challenge, starting from the decision of developing the standard (March-June 2005, to the moment of publishing it, November 2009. So, developing the ISO 31000:2009 standard has been more or less like a bumpy ride. Apparently, the people involved in developing the global risk management standard understood from the very beginning that no challenges are too big, nor any tasks too small and that the task of having a new, comprehensive global risk management standard should be completed with excellence: defining the principles and the framework guiding the risk management process applicable for all type of organizations and for a wide range of activities. Coming up with a global standard should always be based on the real organizations’ needs and should fulfill real risk management requirements. The article is trying to present the pros and cons of risk management standard implementation, challenging the implementation process itself and the added value of implementing the standard due to the lack of implementation enablers, like risk culture, a real problem especially in an international environment.

  6. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  7. Innovations in Quantitative Risk Management

    CERN Document Server

    Scherer, Matthias; Zagst, Rudi

    2015-01-01

    Quantitative models are omnipresent –but often controversially discussed– in todays risk management practice. New regulations, innovative financial products, and advances in valuation techniques provide a continuous flow of challenging problems for financial engineers and risk managers alike. Designing a sound stochastic model requires finding a careful balance between parsimonious model assumptions, mathematical viability, and interpretability of the output. Moreover, data requirements and the end-user training are to be considered as well. The KPMG Center of Excellence in Risk Management conference Risk Management Reloaded and this proceedings volume contribute to bridging the gap between academia –providing methodological advances– and practice –having a firm understanding of the economic conditions in which a given model is used. Discussed fields of application range from asset management, credit risk, and energy to risk management issues in insurance. Methodologically, dependence modeling...

  8. [Evaluation of general practitioners' knowledge about diagnostic and therapeuthic management of erysipelas in the city of Marrakech].

    Science.gov (United States)

    Ihbibane, Fatima; Arsène, Ntini Lebi; Adarmouch, Latifa; Amine, Mohamed; Tassi, Noura

    2018-01-01

    Erysipelas is the most common non necrotizing bacterial dermohypodermitis (NNBDH). This study aimed to evaluate the adequacy of general practitioners' knowledge about literature data on the diagnostic and therapeuthic management of erysipelas. We conducted a cross-sectional descriptive and analytical survey of 167 general practitioners in the public and private sectors in Marrakech over the period from 19 May to 20 October 2014. The 114 questionnaires which had been returned revealed that local and general risk factors were often reported for erysipelas. 92 (80.7%) physicians thought that positive diagnosis of common types was based on clinical examination. 97(85.1%) physicians thought that it required only out-patient service and that hospitalization and para-clinical examinations should only be performed in patients with severe, atypical or complicated erysipelas. 25 (21.9%) physicians thought that oral amoxicillin should be the gold standard therapy. 15(13.2%) physicians thought that bi-antibiotic therapy including antistreptococcique molecule should be the gold standard. 16 doctors (14%) advocated anti-inflammatory drugs. The primary and secondary prevention levels generated interest from physicians of whom 108 (94.7%) were favorable to the treatment of the portals of entry in the skin while 53 (46.5%) to the antibioprophylaxis after the second recurrence. Our study highlights that erysipelas is relatively frequent in city medical practice; clinical diagnosis guidelines should be shared between the specialists in order to improve the diagnostic and therapeutic approch of our physicians.

  9. Investment under uncertain climate policy: A practitioners' perspective on carbon risk

    International Nuclear Information System (INIS)

    Barradale, Merrill Jones

    2014-01-01

    This paper introduces the concept of payment probability as an important component of carbon risk (the financial risk associated with CO 2 emissions under uncertain climate policy). In modeling power plant investment decisions, most existing literature uses the expected carbon price (e.g., the price of traded permits or carbon tax) as a proxy for carbon risk. In contrast, this paper identifies expected carbon payment as a more accurate measure of carbon risk as perceived by industry practitioners. This measure of carbon risk incorporates both expected price and the probability that this price would actually be faced in the case of a particular investment. This concept helps explain both the surge of activity in 2005–2006 and the subsequent decline in interest in coal-fired power plant development in the U.S. The data for this case study comes from an extensive online survey of 700 U.S. energy professionals completed in 2006, as well as interviews conducted with industry representatives from 2007 to 2009. By analyzing industry views on policy uncertainty and future carbon legislation, we gain a better understanding of investor attitudes toward carbon risk. This understanding will help policy makers design better incentives for investing in low-carbon technologies. - Highlights: • A new model of carbon risk that incorporates payment probability is presented. • A survey of 700 U.S. energy professionals conducted in 2006 provides data on beliefs about future climate policy. • The vast majority of respondents expected climate policy to be enacted, but also expected it to be lax. • This data is used to analyze investor attitudes toward carbon risk

  10. Awareness of Stroke Risk after TIA in Swiss General Practitioners and Hospital Physicians.

    Science.gov (United States)

    Streit, Sven; Baumann, Philippe; Barth, Jürgen; Mattle, Heinrich P; Arnold, Marcel; Bassetti, Claudio L; Meli, Damian N; Fischer, Urs

    2015-01-01

    Transient ischemic attacks (TIA) are stroke warning signs and emergency situations, and, if immediately investigated, doctors can intervene to prevent strokes. Nevertheless, many patients delay going to the doctor, and doctors might delay urgently needed investigations and preventative treatments. We set out to determine how much general practitioners (GPs) and hospital physicians (HPs) knew about stroke risk after TIA, and to measure their referral rates. We used a structured questionnaire to ask GPs and HPs in the catchment area of the University Hospital of Bern to estimate a patient's risk of stroke after TIA. We also assessed their referral behavior. We then statistically analysed their reasons for deciding not to immediately refer patients. Of the 1545 physicians, 40% (614) returned the survey. Of these, 75% (457) overestimated stroke risk within 24 hours, and 40% (245) overestimated risk within 3 months after TIA. Only 9% (53) underestimated stroke risk within 24 hours and 26% (158) underestimated risk within 3 months; 78% (473) of physicians overestimated the amount that carotid endarterectomy reduces stroke risk; 93% (543) would rigorously investigate the cause of a TIA, but only 38% (229) would refer TIA patients for urgent investigations "very often". Physicians most commonly gave these reasons for not making emergency referrals: patient's advanced age; patient's preference; patient was multimorbid; and, patient needed long-term care. Although physicians overestimate stroke risk after TIA, their rate of emergency referral is modest, mainly because they tend not to refer multimorbid and elderly patients at the appropriate rate. Since old and frail patients benefit from urgent investigations and treatment after TIA as much as younger patients, future educational campaigns should focus on the importance of emergency evaluations for all TIA patients.

  11. Awareness of Stroke Risk after TIA in Swiss General Practitioners and Hospital Physicians.

    Directory of Open Access Journals (Sweden)

    Sven Streit

    Full Text Available Transient ischemic attacks (TIA are stroke warning signs and emergency situations, and, if immediately investigated, doctors can intervene to prevent strokes. Nevertheless, many patients delay going to the doctor, and doctors might delay urgently needed investigations and preventative treatments. We set out to determine how much general practitioners (GPs and hospital physicians (HPs knew about stroke risk after TIA, and to measure their referral rates.We used a structured questionnaire to ask GPs and HPs in the catchment area of the University Hospital of Bern to estimate a patient's risk of stroke after TIA. We also assessed their referral behavior. We then statistically analysed their reasons for deciding not to immediately refer patients.Of the 1545 physicians, 40% (614 returned the survey. Of these, 75% (457 overestimated stroke risk within 24 hours, and 40% (245 overestimated risk within 3 months after TIA. Only 9% (53 underestimated stroke risk within 24 hours and 26% (158 underestimated risk within 3 months; 78% (473 of physicians overestimated the amount that carotid endarterectomy reduces stroke risk; 93% (543 would rigorously investigate the cause of a TIA, but only 38% (229 would refer TIA patients for urgent investigations "very often". Physicians most commonly gave these reasons for not making emergency referrals: patient's advanced age; patient's preference; patient was multimorbid; and, patient needed long-term care.Although physicians overestimate stroke risk after TIA, their rate of emergency referral is modest, mainly because they tend not to refer multimorbid and elderly patients at the appropriate rate. Since old and frail patients benefit from urgent investigations and treatment after TIA as much as younger patients, future educational campaigns should focus on the importance of emergency evaluations for all TIA patients.

  12. RISK MANAGEMENT IN CUSTOMS CONTROL

    Directory of Open Access Journals (Sweden)

    Elena Valerievna Drobot

    2017-06-01

    Full Text Available Customs administrations operating in the modern global economy are faced with a complex range of challenges. The prime responsibilities remain the collection of revenues and the protection of the society, but these demanding tasks must be performed effectively and efficiently, whilst at the same time facilitating the flow of legitimate goods. Risk management is a logical and systematic method of identifying, analyzing and managing risks. Risk management can be associated with any activity, function or process within the organization and will enable the organization to take advantage of opportunities and minimize potential losses. Minimization of the human factor in customs control through the implementation of non-intrusive inspection equipment can be very useful. The particularities of risk-management system (RMS implementation within customs control are discussed in the article. The authors single out the elements of the risk-management system, evaluate the effectiveness of risk-management in customs control. The main reasons for non-implementation of the risk-management system in customs control are described as well. The particular attention is paid to the benefits of customs risk management. The authors’ hypothesis is that risk management in customs control must find a balance between costs and benefits to address all risks equally. Criteria are needed to decide what constitutes an acceptable or unacceptable risk. Thus, system analysis and risk management system are the effective mechanisms for acceleration of customs clearance and improve the quality of customs control. As a conclusion, the authors give recommendations for the improvement of the effectiveness of risk management system in customs control.

  13. Risk management and corporate value

    Directory of Open Access Journals (Sweden)

    Milan Cupic

    2015-12-01

    Full Text Available The paper presents a theoretical framework for assessing the impact of risk management on corporate value. As the relevant factors that determine this impact, the paper analyzes market imperfections and investors’ risk aversion. The results of the present research indicate that risk management contributes to an increase in corporate value if, under the influence of market imperfections, corporate risk exposure is concave. As an expression of market imperfections, the paper analyzes the costs of financial distress, agency costs, and taxation. The results of the research also indicate that the risk management policy should not aim to minimize, but rather optimize risk exposure, by taking into account the costs of risk management, investors’ risk aversion and the competitive advantage a corporation has on the relevant market.

  14. Sustainable flood risk management – What is sustainable?

    DEFF Research Database (Denmark)

    Sørup, Hjalte Jomo Danielsen; Brudler, Sarah; Lerer, Sara Maria

    2016-01-01

    Sustainable flood risk management has to be achieved since flood protection is a fundamental societal service that we must deliver. Based on the discourse within the fields of risk management and sustainable urban water management, we discuss the necessity of assessing the sustainability of flood...... risk management, and propose an evaluation framework for doing so. We argue that it is necessary to include quantitative sustainability measures in flood risk management in order to exclude unsustainable solutions. Furthermore, we use the concept of absolute sustainability to discuss the prospects...... of maintaining current service levels without compromising future generation’s entitlement of services. Discussions on the sustainability of different overall flood risk schemes must take place. Fundamental changes in the approaches will require fundamental changes in the mind-sets of practitioners as well...

  15. Risk management of precious metals

    NARCIS (Netherlands)

    S.M. Hammoudeh (Shawkat); F. Malik (Farooq); M.J. McAleer (Michael)

    2010-01-01

    textabstractThis paper examines volatility and correlation dynamics in price returns of gold, silver, platinum and palladium, and explores the corresponding risk management implications for market risk and hedging. Value-at-Risk (VaR) is used to analyze the downside market risk associated with

  16. Risk Management in Logystics Chains

    OpenAIRE

    Butrin, Andrey; Vikulov, Vladimir

    2013-01-01

    Article is devoted to risk management of supply chain. The authors considered indicators of supply chain risks, including risks caused by supplier. Authors formed a method of optimizing the level of supply chain risk in the integration with suppliers and customers.

  17. Improving Information Security Risk Management

    Science.gov (United States)

    Singh, Anand

    2009-01-01

    manaOptimizing risk to information to protect the enterprise as well as to satisfy government and industry mandates is a core function of most information security departments. Risk management is the discipline that is focused on assessing, mitigating, monitoring and optimizing risks to information. Risk assessments and analyses are critical…

  18. RISKS MANAGEMENT: NEW LITERATURE REVIEW

    OpenAIRE

    Ennouri Wissem

    2013-01-01

    The complexity of the industrial activities and the important mass of flows crossing the supply chain promotes the emergence of risks that must be considered in the decision process. For this reason, we have developed this paper to clarify the basics of risk management through a short new suggestion of literature review for risk management. Our justification of this attempt is that this area is the most discussed in our days and it is impossible to present all definition of the risk concept, ...

  19. Integrated supply chain risk management

    OpenAIRE

    Riaan Bredell; Jackie Walters

    2007-01-01

    Integrated supply chain risk management (ISCRM) has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly ...

  20. Treatment and disease management of multiple sclerosis patients: A review for nurse practitioners.

    Science.gov (United States)

    Roman, Cortnee; Menning, Kara

    2017-10-01

    This review discusses the role of the nurse practitioner (NP) in evaluating the clinical effects, potential side effects, and monitoring requirements for treatment options in multiple sclerosis (MS) and provides guidance on how to help patients understand these issues. A literature search was conducted on PubMed to identify publications on monitoring and disease management of MS patients. Additional resources included drug information web sites and package inserts. NPs play an active role in the management of MS patients via effective monitoring and communication throughout the patient's treatment regimen and disease course. In the shared decision-making model of MS treatment, NPs ensure that patients understand the implications of their disease-modifying therapies (DMTs). As patients move through treatments during the course of their disease, the importance of this role increases, and it is critical that NPs follow the guidelines in each medication's product label and take into account any potential lingering effects of prior medications. It is critical for NPs to promote patient adherence, to ensure that patients understand treatment side effects and monitoring requirements, and to take sequencing and reversibility implications of DMTs into account when making clinical decisions. ©2017 American Association of Nurse Practitioners.

  1. Professional stress in general practitioners and psychiatrists: The level of psycologic distress and burnout risk

    Directory of Open Access Journals (Sweden)

    Vićentić Sreten

    2010-01-01

    Full Text Available Background/Aim. So far, studies of stress have shown that physicians are at a high risk of sickness from psychic and somatic disorders related to professional stress, that can lead to important disturbance of personal, familiar and professional functionating. The aim of this study was to investigate the doctors exposition level to professional stress, to compare stress level in general practitioners (GP group with that in the group of psychiatrists and risk level for the apperance of burnout syndrome. Methods. This cross-section study included subjects recruited by a random sample method. Thirty General Practice doctors and 30 psychiatrists (totally 60 doctors filled the set of 3 questionnaires: Sociodemographics features, General Health Questionnaire (GHQ; Goldberg D, 1991, and Maslach Burnout Inventory (MBI; Maslach C, 1996. Appropriate statistical procedures (Pearson test, t-test, variance analysis in interpretation of the results were used. Results. A total level of psychic distress measured with the GHQ test in both groups of physicians was very low implying their good mental health. A difference in Burnout risk based on MBI test between the groups was statistically significant (χ2 = 4,286; p < 0.05 only at subscale Personal Accomplishment (MBI-PA; it was a consequence of a higher number of GPs with medium burnout risk (13.3 : 0.0%. However, even 35 physicians from the sample were affected with a high burnout risk measured with subscales Emotional Ehausation (MBI-EE and MBI-DP, showing that both groups of physicians had risk for the appearance of burnout syndrome. Conclusion. The obtained results showed a high burnout risk level in both, GPs and psychiatrists, groups. In both groups there was no presence of psychic disorders (anxiety, depression, insomnia, while there was a high level of emotional ehausation and overtension by job, and also a lower total personal accomplishment. Level of exposition to professional stress is higher in GPs

  2. Managing the risks of risk management on large fires

    Science.gov (United States)

    Donald G. MacGregor; Armando González-Cabán

    2013-01-01

    Large fires pose risks to a number of important values, including the ecology, property and the lives of incident responders. A relatively unstudied aspect of fire management is the risks to which incident managers are exposed due to organizational and sociopolitical factors that put them in a position of, for example, potential liability or degradation of their image...

  3. Do general practitioners' risk-taking propensities and learning styles influence their continuing medical education preferences?

    Science.gov (United States)

    Robinson, Geoffrey

    2002-01-01

    US studies have shown that a clinician's risk-taking propensity significantly predicts clinical behaviour. Other US studies examining relationships between family practice doctors' preferences for CME and their Kolb learning style have described conflicting findings. The aim of the present study was to investigate GPs' learning styles, risk-taking propensities and CME preferences, and to explore links between them. A descriptive confidential cross-sectional postal questionnaire survey of the 304 general practitioner principals within Portsmouth and South East Hampshire Health Authority was conducted. Two hundred and seventy-four GPs returned questionnaires, a response rate of 90.1%. The Kolb learning style types were assimilators 43.8% (predominant learning abilities watching and thinking), divergers 21.1% (feeling and watching), convergers 18.3% (doing and thinking), and accommodators 16.8% (doing and feeling). The Pearson risk-taking propensities were 65.8% risk neutral, 19.4% risk seeking and 14.8% risk averse. Risk-seeking GPs were significantly more likely to be accommodators or convergers than divergers or assimilators (p = 0.006). Majorities of 54.9% stated that the present PGEA system works well, 85% welcomed feedback from their peers, and 76.8% stated that learning should be an activity for all the practice team. Further majorities would welcome help to decide their learning needs (63.8%) and are looking to judge CME effectiveness by changes in GP performance or patient care (54.8%). Further significant correlations and cross-tabulations were found between learning style and risk-taking and CME attitudes, experiences and preferences. It is concluded that risk seekers and accommodators (doing and feeling) prefer feedback, interaction and practical hands-on learning, and assimilators (watching and thinking) and the risk averse tend towards lectures, theoretical learning formats and less interactive activities. Sharing feelings in groups may be difficult for

  4. The Uncertainties of Risk Management

    DEFF Research Database (Denmark)

    Vinnari, Eija; Skærbæk, Peter

    2014-01-01

    for expanding risk management. More generally, such uncertainties relate to the professional identities and responsibilities of operational managers as defined by the framing devices. Originality/value – The paper offers three contributions to the extant literature: first, it shows how risk management itself......Purpose – The purpose of this paper is to analyse the implementation of risk management as a tool for internal audit activities, focusing on unexpected effects or uncertainties generated during its application. Design/methodology/approach – Public and confidential documents as well as semi......-structured interviews are analysed through the lens of actor-network theory to identify the effects of risk management devices in a Finnish municipality. Findings – The authors found that risk management, rather than reducing uncertainty, itself created unexpected uncertainties that would otherwise not have emerged...

  5. Shifting patterns of practice: nurse practitioners in a managed care environment.

    Science.gov (United States)

    Johnson, Rosemary

    2005-01-01

    The purpose of this qualitative study was to uncover patterns across nurse practitioner (NP) experiences that contribute to understanding their perceptions of managed care, how it affects daily practice, and how NPs respond to a changing managed care workplace. In-depth interviews were conducted with 14 NPs representing primary care, specialty, and independent practices. Over an 18-month period, data collection and analysis occurred simultaneously using standard methods of purposive sampling, constant comparison, memoing, and member checks. This study illuminates the tension NPs experience between a business and a professional ethic and the strategies they use to reconcile this difference with core nursing values. Type of setting, workplace dynamics, and length of time in practice contributed to variation in NP perspectives.

  6. Continuous Risk Management at NASA

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.

  7. DEFENSE PROGRAMS RISK MANAGEMENT FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2012-01-01

    Full Text Available For the past years defense programs have faced delays in delivering defense capabilities and budget overruns. Stakeholders are looking for ways to improve program management and the decision making process given the very fluid and uncertain economic and political environment. Consequently, they have increasingly resorted to risk management as the main management tool for achieving defense programs objectives and for delivering the defense capabilities strongly needed for the soldiers on the ground on time and within limited defense budgets. Following a risk management based decision-making approach the stakeholders are expected not only to protect program objectives against a wide range of risks but, at the same time, to take advantage of the opportunities to increase the likelihood of program success. The prerequisite for making risk management the main tool for achieving defense programs objectives is the design and implementation of a strong risk management framework as a foundation providing an efficient and effective application of the best risk management practices. The aim of this paper is to examine the risk management framework for defense programs based on the ISO 31000:2009 standard, best risk management practices and the defense programs’ needs and particularities. For the purposes of this article, the term of defense programs refers to joint defense programs.

  8. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    OpenAIRE

    Szabo Alina

    2012-01-01

    Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in ...

  9. NGNP Risk Management Database: A Model for Managing Risk

    International Nuclear Information System (INIS)

    Collins, John

    2009-01-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft(reg s ign) Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool's design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  10. NGNP Risk Management Database: A Model for Managing Risk

    Energy Technology Data Exchange (ETDEWEB)

    John Collins

    2009-09-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft® Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool’s design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  11. Advances in Probabilistic Risk Assessment (PRA): a look into practitioners toolbox

    International Nuclear Information System (INIS)

    Mok, J.; Kaasalainen, S.; Donnelly, K.

    2007-01-01

    The ever-increasing emphasis on the use of Probabilistic Risk Assessment (PRA) in risk-informed decision making translates into increased expectations relating to PRA applications for the groups tasked with developing and maintaining the facility PRAs. In order to succeed in meeting the demand for PRA work, it is essential to develop methodologies and tools (or utilities) that improve the efficiency with which the PRAs are processed and manipulated to obtain a solution. Examples from the Nuclear Safety Solutions (NSS) PRA Practitioners tool box include utilities for cutting logical loops, optimizing fault trees (to decrease run-times), modularizing fault trees, and converting event trees into high level fault tree logic (an important element if the PRA study is to be used to support a risk monitor such as an Equipment Out-of-Service (EOOS) Monitor). The objective of this paper is be to briefly describe the main features of these utilities, and to illustrate the value they have in terms of improving the efficiency and effectiveness of PRA development and maintenance at NSS. (author)

  12. Primary care practitioner and patient understanding of the concepts of multimorbidity and self-management: A qualitative study

    Directory of Open Access Journals (Sweden)

    Cassandra Kenning

    2013-10-01

    Full Text Available Objectives: The aim of this article is to offer insight into how professionals and patients understand and experience multimorbidity and how these accounts differ, and how they affect attitudes and engagement with self-management. Methods: Semi-structured interviews with 20 primary healthcare practitioners and 20 patients with at least 2 long-term conditions (including coronary heart disease, diabetes, osteoarthritis, chronic obstructive pulmonary disease and depression. Thematic analysis was used, and themes were identified using an open-coding method. Results: Practitioners associated multimorbidity with complexity and uncertainty in the clinic, leading to emotional strain and ‘heart sink’. Patient accounts differed. Some described multimorbidity as problematic when it exacerbated their symptoms and caused emotional and psychological strain. Others did not perceive multimorbidity as problematic. Self-management was seen by practitioners and patients to be a key element of managing multiple conditions, but drivers for prompting and engaging in self-management differed between patients and practitioners. Conclusion: This study suggests that recommendations for clinical practice for multimorbid patients should take into account the gap in perceptions between practitioner and patients about experiences of multimorbidity. Not least, practice would need to reflect the tension between practitioners’ and patients’ accounts about the role and benefits of self-management in the presence of multimorbidity.

  13. Selecting Copulas for Risk Management

    NARCIS (Netherlands)

    H.J.W.G. Kole (Erik); C.G. Koedijk (Kees); M.J.C.M. Verbeek (Marno)

    2006-01-01

    textabstractCopulas offer financial risk managers a powerful tool to model the dependence between the different elements of a portfolio and are preferable to the traditional, correlation-based approach. In this paper we show the importance of selecting an accurate copula for risk management. We

  14. Corporate risk management : an overview

    NARCIS (Netherlands)

    Oosterhof, Casper M.

    2001-01-01

    Corporate risk management and hedging are important activities within financial as well as non-financial corporations. Under the assumptions of Modigliani and Miller [1958], corporate risk management is a redundant activity. However, the existence of market imperfections can explain the corporate

  15. Nurse practitioners' perceptions of interprofessional team functioning with implications for nurse managers.

    Science.gov (United States)

    Heale, Roberta; Dickieson, Patti; Carter, Lorraine; Wenghofer, Elizabeth F

    2014-10-01

    To determine the perceptions of nurse practitioners (NPs) about the level of functioning of their interprofessional teams. Interprofessional teams are a global trend, and nurses play leadership roles in their management. Little is known about the impact of specific barriers to team functioning and the role of the nurse manager on team functioning. Ninety-eight NPs at a conference completed the Interprofessional Team Functioning Survey (ITFS). The survey items with the lowest mean scores were related to organisational systems. These items included workplace policies that support interprofessional teamwork, in particular, orientation to the interprofessional team. Items that generated lower mean scores were adequate time to work as a member of the interprofessional team, team dynamics, collaboration among team members and the sharing of responsibility. Organisational and team relational issues can be addressed through organisational management strategies. Nurse managers have an important role in facilitating high functioning interprofessional teams. Strategies for managers to support interprofessional team functioning emerged. These strategies include ensuring that there are appropriate policies, orientation of new members, allocation of time to support interprofessional teamwork, leadership to enhance team collaboration and clear delineation of responsibilities of each member. © 2013 John Wiley & Sons Ltd.

  16. Embattled and embittered or empowered and evolving: nurse practitioner attitudes toward managed care.

    Science.gov (United States)

    Hayes, Eileen F

    2007-03-01

    To explore the attitudes of nurse practitioners (NPs) toward managed care and to identify the sources of negative attitudes and the factors that may ameliorate them. NPs, members of the Massachusetts Coalition of NPs, participated in in-depth interviews about the impact of managed care on their practice. The sources of NP negativity about managed care for many study participants lay in their not appreciating the importance of the business aspects of practice and the provider's role in controlling healthcare costs, reluctance to work with what they perceived as a rigid "system," and lack of support for them to navigate it. They felt pressured by productivity issues, time constraints, practice restrictions, and documentation demands associated with reimbursement. Those who sustained a more positive attitude were realistic about healthcare economics, were willing and able to negotiate the system, were creative and flexible, and felt empowered by knowledge of the business of practice. Some NPs, however, chose to work in practices where they did not feel as pressured as their counterparts in large, busy primary care practices. IMPLICATIONS FOR NP PRACTICE AND EDUCATION: Understanding experiences that have influenced NP attitudes regarding managed care may assist NP faculty to better prepare NP students for their future roles. NPs must be able to challenge, yet be part of, an evolving system that promotes cost-effective health care for everyone, which was what managed care originally was intended to do.

  17. The Supply Chain Risk Management

    OpenAIRE

    Skitsko Volodymyr I.; Voynikov Mykola Yu.

    2018-01-01

    The article considers current approaches of risk-management in supply chains, the main steps of the risk management process are analyzed and detailed both for a separate enterprise – participant of supply chain, for the supply chain in general, and for the Beer game, based on the international risk management standards. The article provides a way to assess the risks of the «producer» in the Beer game according to the three strategies of its behavior, which presumably can correspond to differe...

  18. Information Risk Management: Qualitative or Quantitative? Cross industry lessons from medical and financial fields

    Directory of Open Access Journals (Sweden)

    Upasna Saluja

    2012-06-01

    Full Text Available Enterprises across the world are taking a hard look at their risk management practices. A number of qualitative and quantitative models and approaches are employed by risk practitioners to keep risk under check. As a norm most organizations end up choosing the more flexible, easier to deploy and customize qualitative models of risk assessment. In practice one sees that such models often call upon the practitioners to make qualitative judgments on a relative rating scale which brings in considerable room for errors, biases and subjectivity. On the other hand under the quantitative risk analysis approach, estimation of risk is connected with application of numerical measures of some kind. Medical risk management models lend themselves as ideal candidates for deriving lessons for Information Security Risk Management. We can use this considerably developed understanding of risk management from the medical field especially Survival Analysis towards handling risks that information infrastructures face. Similarly, financial risk management discipline prides itself on perhaps the most quantifiable of models in risk management. Market Risk and Credit Risk Information Security Risk Management can make risk measurement more objective and quantitative by referring to the approach of Credit Risk. During the recent financial crisis many investors and financial institutions lost money or went bankrupt respectively, because they did not apply the basic principles of risk management. Learning from the financial crisis provides some valuable lessons for information risk management.

  19. Risk management for whales

    OpenAIRE

    Cont, R; Wagalath, L

    2016-01-01

    We propose framework for modeling portfolio risk which integrates market risk with liquidation costs which may arise in stress scenarios. Our model provides a systematic method for computing liquidation-adjusted risk measures for a portfolio. Calculation of Liquidation-adjusted VaR (LVaR) for sample portfolios reveals a substantial impact of liquidation costs on portfolio risk for portfolios with large concentrated positions.

  20. Business risk management

    International Nuclear Information System (INIS)

    Cosby, C.

    2015-01-01

    Bruce Power's definition: an emerging and demonstrable event or change in business plan assumptions that could impact Bruce Power's achievement of its business plan objectives and results. Risks can be either negative (threats) or positive (opportunities). Risks against the 5 year business plan Net Risk = impact * probability.

  1. Business risk management

    Energy Technology Data Exchange (ETDEWEB)

    Cosby, C., E-mail: Christine.cosby@brucepower.com [Bruce Power, Tiverton, ON (Canada)

    2015-07-01

    Bruce Power's definition: an emerging and demonstrable event or change in business plan assumptions that could impact Bruce Power's achievement of its business plan objectives and results. Risks can be either negative (threats) or positive (opportunities). Risks against the 5 year business plan Net Risk = impact * probability.

  2. Occupational therapy practitioners' perceptions of rehabilitation managers' leadership styles and the outcomes of leadership.

    Science.gov (United States)

    Jeff, Snodgrass; Douthitt, Shannon; Ellis, Rachel; Wade, Shelly; Plemons, Josh

    2008-01-01

    The purpose of this research was to serve as a pilot study to investigate the association between occupational therapy practitioners' perceptions of rehabilitation managers' leadership styles and the outcomes of leadership. Data for this study were collected using the Multifactor Leadership Questionnaire Form 5X and a self-designed demographic questionnaire. The study working sample included 73 occupational therapy practitioners. Major findings from the study indicate that overall, transformational, and transactional leadership styles are associated with leadership outcomes. Transformational leadership had a significant (p leadership outcomes, whereas transactional leadership had a significant (p leadership outcomes. The contingent reward leadership attribute (although belonging to the transactional leadership construct) was found to be positively associated with leadership outcomes, similar to the transformational leadership constructs. The results of this research suggest that transformational leadership styles have a positive association with leadership outcomes, whereas transactional leadership styles have a negative association, excluding the positive transactional contingent reward attribute. A larger, random sample is recommended as a follow-up study.

  3. TRManager – Technical Risk Manager

    Directory of Open Access Journals (Sweden)

    Mark A. Gregory

    2009-06-01

    Full Text Available This paper presents research into the development of a new information management technique called Technical Risk Manager. Project management involves the use of processes and information management techniques to aid decision making in the pursuit of project success. Project success may be achieved by meeting time, cost or performance criteria. Current project management practices focus on achieving time and cost project success criteria by using three information management techniques developed in the 1950s: Gantt, PERT and Critical Path Method. Technical Risk Manager has been developed to provide an information management technique that may be used to aid project management decision making in the pursuit of achieving the performance project success criteria.

  4. Smart Grid Risk Management

    Science.gov (United States)

    Abad Lopez, Carlos Adrian

    Current electricity infrastructure is being stressed from several directions -- high demand, unreliable supply, extreme weather conditions, accidents, among others. Infrastructure planners have, traditionally, focused on only the cost of the system; today, resilience and sustainability are increasingly becoming more important. In this dissertation, we develop computational tools for efficiently managing electricity resources to help create a more reliable and sustainable electrical grid. The tools we present in this work will help electric utilities coordinate demand to allow the smooth and large scale integration of renewable sources of energy into traditional grids, as well as provide infrastructure planners and operators in developing countries a framework for making informed planning and control decisions in the presence of uncertainty. Demand-side management is considered as the most viable solution for maintaining grid stability as generation from intermittent renewable sources increases. Demand-side management, particularly demand response (DR) programs that attempt to alter the energy consumption of customers either by using price-based incentives or up-front power interruption contracts, is more cost-effective and sustainable in addressing short-term supply-demand imbalances when compared with the alternative that involves increasing fossil fuel-based fast spinning reserves. An essential step in compensating participating customers and benchmarking the effectiveness of DR programs is to be able to independently detect the load reduction from observed meter data. Electric utilities implementing automated DR programs through direct load control switches are also interested in detecting the reduction in demand to efficiently pinpoint non-functioning devices to reduce maintenance costs. We develop sparse optimization methods for detecting a small change in the demand for electricity of a customer in response to a price change or signal from the utility

  5. INTERNAL AUDIT AND RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Elena RUSE

    2014-04-01

    Full Text Available The existence of risk in economic activity can not be denied. In fact, the risk is a concept which exists in every activity, the term of risk being identified with uncertainty, respectively the (unchance to produce an undesirable event. Internal audit and risk management aim at the same goal, namely the control of risks. Internal Audit performs several roles in risk management plan. The objectives of the internal audit function varies from company to company, but in all economic entities internal audit department aims to improve performance management, enterprise performance and thus improve the internal control system. This paper aims to demonstrate, among other things, that any event that may result in failure is unquestionably classified as risk.

  6. Integrated supply chain risk management

    Directory of Open Access Journals (Sweden)

    Riaan Bredell

    2007-11-01

    Full Text Available Integrated supply chain risk management (ISCRM has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly applied, this process may optimise management decision-making and assist in the protection and enhancement of shareholder value.

  7. Management of multinodular goiter in Germany (Papillon 2005). Do the approaches of thyroid specialists and primary care practitioners differ?

    Energy Technology Data Exchange (ETDEWEB)

    Dietlein, M.; Schmidt, M.; Schicha, H. [Koeln Univ. (Germany). Dept. of Nuclear Medicine; Wegscheider, K. [Hamburg Univ. (Germany). Inst. of Statistics and Econometrics; Vaupel, R. [Sanofi-Aventis Deutschland GmbH, Berlin (Germany)

    2007-07-01

    Aim: Large-scale survey to focus on management of multinodular goiter and to compare the approaches of practitioners in primary care and thyroid specialists in Germany. Methods: Replies to a questionnaire were received from 2,191 practitioners and 297 thyroid specialists between June 1 and September 30, 2005. The hypothetical cases and their modifications described multinodular goiters of different sizes with and without toxic nodules. Results: In the workup, TSH determination and thyroid sonography were found to be standard procedures. Scintigraphy was selected by 80.2% of practitioners and 92.9% of specialists (p <0.001), in preference to fine needle aspiration cytology (17.9% of practitioners and 34.5% of the specialists, p <0.001). Only 6.1% of practitioners and 24.4% of specialists (p <0.001) advocated calcitonin screening. Euthyroid multinodular goiter (50-80 ml) was treated medically by 67.1% of practitioners and 65.6% of specialists, the combination of levothyroxine with iodine being clearly preferred (54.5% of practitioners, 52.3% of specialists). For toxic nodular goiter the preference for radioiodine therapy was significantly higher (p <0.001) among specialists (67.7%) than among practitioners (47.5%). Referral to surgery was recommended for cold nodules with negative cytology by 64.9% of practitioners and 73.5% of specialists (p = 0.004). Conclusions: Treatment and diagnostic procedures are used to nearly the same extent in primary care and specialist institutions, but the opinions diverge over the issues of calcitonin screening and referral for radioiodine therapy. (orig.)

  8. Management of multinodular goiter in Germany (Papillon 2005). Do the approaches of thyroid specialists and primary care practitioners differ?

    International Nuclear Information System (INIS)

    Dietlein, M.; Schmidt, M.; Schicha, H.

    2007-01-01

    Aim: Large-scale survey to focus on management of multinodular goiter and to compare the approaches of practitioners in primary care and thyroid specialists in Germany. Methods: Replies to a questionnaire were received from 2,191 practitioners and 297 thyroid specialists between June 1 and September 30, 2005. The hypothetical cases and their modifications described multinodular goiters of different sizes with and without toxic nodules. Results: In the workup, TSH determination and thyroid sonography were found to be standard procedures. Scintigraphy was selected by 80.2% of practitioners and 92.9% of specialists (p <0.001), in preference to fine needle aspiration cytology (17.9% of practitioners and 34.5% of the specialists, p <0.001). Only 6.1% of practitioners and 24.4% of specialists (p <0.001) advocated calcitonin screening. Euthyroid multinodular goiter (50-80 ml) was treated medically by 67.1% of practitioners and 65.6% of specialists, the combination of levothyroxine with iodine being clearly preferred (54.5% of practitioners, 52.3% of specialists). For toxic nodular goiter the preference for radioiodine therapy was significantly higher (p <0.001) among specialists (67.7%) than among practitioners (47.5%). Referral to surgery was recommended for cold nodules with negative cytology by 64.9% of practitioners and 73.5% of specialists (p 0.004). Conclusions: Treatment and diagnostic procedures are used to nearly the same extent in primary care and specialist institutions, but the opinions diverge over the issues of calcitonin screening and referral for radioiodine therapy. (orig.)

  9. The opinion of the general practitioner toward clinical management of patients with psychogenic nonepileptic seizures.

    LENUS (Irish Health Repository)

    O'Sullivan, S S

    2012-02-03

    OBJECTIVE: The purpose of this work was to assess the opinion of general practitioners (GPs) regarding the diagnosis of psychogenic nonepileptic seizures (PNES) and the role they feel they should play in the management of the disorder. METHODS: Patients with PNES were identified from hospital records. Seizure and patient characteristics were recorded. Their GPs were surveyed regarding their understanding of the diagnosis and ongoing management of PNES. RESULTS: Twenty-three patients were identified over a 3-year period as having been diagnosed with PNES. Sixty-five percent of GPs agreed with the diagnosis, and when asked to grade their understanding of the diagnosis (poor = 1, excellent = 10), the mean score was 5.7 (+\\/-SD 2.3). Thirty-five percent of GPs felt psychological input was of benefit to their patients. Fifty-two percent of GPs felt comfortable following up these patients, either with or without neurology outpatient services. CONCLUSIONS: PNES remains a difficult disease to manage. There is a high level of uncertainty regarding the optimum management of PNES among primary care physicians, for which further education is needed.

  10. Treatment management between orthodontists and general practitioners performing clear aligner therapy.

    Science.gov (United States)

    Best, Alexandra D; Shroff, Bhavna; Carrico, Caroline K; Lindauer, Steven J

    2017-05-01

    To investigate differences in case selection, treatment management, and aligner treatment expertise between orthodontists and general practitioners. A parallel pair of original surveys with three sections (case selection, treatment management, and demographics) was sent to orthodontists (N = 1000) and general dentists (N = 1000) who were providers of aligner treatment. Orthodontists had treated significantly more patients with aligners, had treated more patients with aligners in the previous 12 months, and had received more aligner training than general dentists (P aligner case confidence between orthodontists and general dentists for several malocclusions. General dentists were more confident than orthodontists in treating deep bite, severe crowding, and Class II malocclusions with aligners (P ≤ .0001). Significant differences were also found for all treatment management techniques except interproximal reduction. There was a significant difference in case selection, treatment management, and aligner expertise between orthodontists and general dentists, although the differences in case selection were small. Overall, it was shown that orthodontists and general dentists elected to treat a variety of moderate to severe malocclusions with aligners but with different utilization of recommended auxiliaries, perhaps demonstrating a difference in treatment goals.

  11. Enterprise risk management and disclosure

    Directory of Open Access Journals (Sweden)

    Nicoleta Farcane

    2008-01-01

    Full Text Available Our paper deals with aspects regarding risk and uncertainty. Many risk management methods are today implemented in organizations. This perspective reveals that managers are linked in different forms to the activities they are managing, depending on the conditions and levels of uncertainty they are in. Actually, these multiple levels of uncertainty lead to the conclusion that any situation in an organizational system can be classified in two different models of organizational phenomena: the organizational phenomena that are putting managers and stakeholders in conditions of risk and the organizational phenomena that are putting them in condition of uncertainty. Using content analyze in this paper we survey the disclosure level of risk management information in the annual report of top Romanian listed companies.

  12. RISKS IN INVESTMENT AND MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ms. Tatiana A. Ykovleva

    2016-12-01

    Full Text Available The article discusses the features of investment risks and their causes, as well as provides a detailed classification of investment risks. The authors reveal the essence and content of the investment process, risk management, providing material for presentation in the form of a diagram. In conclusion, the article explains the use of the system of specialized institutions as a way to exclude the basic, or primary investment risk.

  13. Recognition and management of perinatal depression and anxiety by general practitioners: a systematic review.

    Science.gov (United States)

    Ford, Elizabeth; Shakespeare, Judy; Elias, Fatin; Ayers, Susan

    2017-02-01

    Perinatal anxiety and depression are widespread, with up to 20% of women affected during pregnancy and after birth. In the UK, management of perinatal mental health falls under the remit of general practitioners (GPs). We reviewed the literature on GPs' routine recognition, diagnosis and management of anxiety and depression in the perinatal period. A systematic search of Embase, Medline, PsycInfo, Pubmed, Scopus and Web of Science was conducted. Studies were eligible if they reported quantitative measures of GPs' or Family Physicians' assessment, recognition and management of anxiety or depression in pregnancy or post-partum. Thirteen papers, reporting 10 studies, were identified from the United States, Australia, UK, Netherlands and Canada. All reported on depression; two included anxiety disorders. Reported awareness and ability to diagnose perinatal depression among GPs was high. GPs knew about and used screening tools in the UK but less so in US settings. Antidepressants were the first line of treatment, with various SSRIs considered safest. Counseling by GPs and referrals to specialists were common in the post-natal period, less so in pregnancy. Treatment choices were determined by resources, attitudes, knowledge and training. Data on GPs' awareness and management of perinatal depression were sparse and unlikely to be generalizable. Future directions for research are proposed; such as exploring the management of anxiety disorders which are largely missing from the literature, and understanding more about barriers to disclosure and recognition in primary care. More standardized training could help to improve recognition and management practices. © The Author 2016. Published by Oxford University Press. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  14. Occupational Practitioner's Role in the Management of a Crisis: Lessons Learned from the Paris November 2015 Terrorist Attack.

    Science.gov (United States)

    Descatha, Alexis; Huynh Tuong, Alice; Coninx, Pierre; Baer, Michel; Loeb, Thomas; Despréaux, Thomas

    2016-01-01

    In massive catastrophic events, occupational health practitioners are more and more frequently involved in the management of such situations. We aim to describe the multiple aspects of the role that occupational health practitioners might play, by focusing on the recent example of the Paris terrorist attack of November 2015. During and after the Paris attack, occupational practitioners, in collaboration with emergency and security professionals, were involved in psychological care, assembling information, follow-up, return-to-work, and improving in-company safety plans. Based on this experience and other industrial disasters, we distinguish three phases: the critical phase, the post-critical phase, and the anticipation phase. In the critical phase, the occupational practitioner cares for patients before the emergency professionals take charge, initiates the psychological management, and may also play an organizational role for company health aspects. In the post-critical phase, he or she would be involved in monitoring those affected by the events and participate in preventing, to the extent possible, posttraumatic stress disorder, helping victims in the return-to-work process, and improving procedures and organizing drills. In addition to their usual work of primary prevention, occupational practitioners should endeavor to improve preparedness in the anticipation phase, by taking part in contingency planning, training in first aid, and defining immediately applicable protocols. In conclusion, recent events have highlighted the essential role of occupational health services in anticipation of a crisis, management during the crisis, and follow-up.

  15. Occupational practitioner's role in the management of a crisis: lessons learned from the Paris November 2015 terrorist attack

    Directory of Open Access Journals (Sweden)

    Alexis Descatha

    2016-09-01

    Full Text Available In massive catastrophic events, occupational health practitioners are more and more frequently involved in the management of such situations. We aim to describe the multiple aspects of the role that occupational health practitioners might play, by focusing on the recent example of the Paris terrorist attack of November 2015.During and after the Paris attack, occupational practitioners in collaboration with emergency and security professionals were involved in psychological care, assembling information, follow-up, return-to-work, and improving in-company safety plans.Based on this experience and other industrial disasters, we distinguish three phases: the critical phase, the post-critical phase, and the anticipation phase. In the critical phase, the occupational practitioner cares for patients before the emergency professionals take charge, initiates the psychological management, and may also play an organizational role for company health aspects. In the post-critical phase, he or she would be involved in monitoring those affected by the events, and participate in preventing, to the extent possible, post-traumatic stress disorder, helping victims in the return-to-work process, and improving procedures and organizing drills. In addition to their usual work of primary prevention, occupational practitioners should endeavor to improve preparedness in the anticipation phase, by taking part in contingency planning, training in first aid, and defining immediately applicable protocols.In conclusion, recent events have highlighted the essential role of occupational health services in anticipation of a crisis, management during the crisis, and follow-up.

  16. Risk Management Issues - An Aerospace Perspective

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks--risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements.. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner, Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  17. Improving Operational Risk Management Using Business Performance Management Technologies

    OpenAIRE

    Bram Pieket Weeserik; Marco Spruit

    2018-01-01

    Operational Risk Management (ORM) comprises the continuous management of risks resulting from: human actions, internal processes, systems, and external events. With increasing requirements, complexity and a growing volume of risks, information systems provide benefits for integrating risk management activities and optimizing performance. Business Performance Management (BPM) technologies are believed to provide a solution for effective Operational Risk Management by offering several combined ...

  18. Scope of environmental risk management

    Energy Technology Data Exchange (ETDEWEB)

    O' Riordan, T

    1979-01-01

    Environmental risk management embraces three techniques for project appraisal: cost/benefit analysis, environmental impact analysis and risk assessment. It also explicitly relates scientific investigations to political judgments, sometimes so closely that the two cannot be separated. Indeed it is now apparent that environmental risk management encompasses procedures both to review the relative merits and priorities of policies as well as to appraise the environmental risks of particular schemes. Until recently this relationship has not been fully appreciated, so much imagination and innovation is still required to develop the most-suitable mechanisms for review.

  19. The Theme of Risk Management

    Directory of Open Access Journals (Sweden)

    Chua, D. K. H.

    2014-07-01

    Full Text Available The papers in this issue of the Journal come from different industry sectors, yet there can be a common theme that ties them together. Two of the papers address explicitly the issue of risk management, while the other three may be related to it in different degrees. One of the critical factors for project success is risk identification, as determined by Chua et al. (1999. The importance of risk management cannot be overemphasized. Failure to identify crucial risk elements in a project can lead to significant project failures in terms of cost and schedule.

  20. Tailoring Risk Management in Design

    DEFF Research Database (Denmark)

    Tegeltija, M.; Oehmen, J.; McMahon, C. A.

    2018-01-01

    While risk quantification research has grown over the last few decades, only a limited number of studies have addressed the overall process integration of these approaches in design risk management. This paper argues that the choice of risk quantification method has strong implications for several...... process aspects. We investigate current risk management maturity models and suggest an expansion to accommodate requirements originating from the choice of quantification method, and to inform the choice of quantification method, based on other process parameters, validated through 3 case companies....

  1. Knowledge management, business intelligence, and content management the IT practitioner's guide

    CERN Document Server

    Keyes, Jessica

    2006-01-01

    The New Intelligence: The Birth of the KnowledgeManagement Industry Buried in Information From Batch to Decision Support A Short Course in Knowledge Representation Data, Information, Knowledge, and Wisdom - and Why WeNeed to Do This Embedding Knowledge Management in the OrganizationWhere Do We Go Next?Knowledge Management Transfer Strategies KM Frameworks Knowledge Transfer TechniquesWhere Do We Go Next?Knowledge-Engineering Techniques Two Levels of Knowledge ElicitationA Knowledge-Engineering MethodologyWhere Do We Go Next? Innovation ManagementSources of InnovationGenerating Innovation Compu

  2. Promoting self-care through symptom management: a theory-based approach for nurse practitioners.

    Science.gov (United States)

    Fowler, Christopher; Kirschner, Michelle; Van Kuiken, Debra; Baas, Linda

    2007-05-01

    To present a theory of illness representation useful in clinical practice along with two case studies as examples of theory implementation. Literature review of relevant theory and associated literature, case studies from clinical practice. An individual asks several questions when experiencing a physical sensation: "Am I sick, stressed, or is this a sign of aging? If I'm sick, is the symptom connected with a disease label?" After asking these questions, the individual develops a cognitive and emotional illness representation that includes the dimensions of identity, cause, consequences, control, and timeline. This representation is guided by personal, cultural, and environmental contexts and determines coping strategies. By assessing the individual's cognitive and emotional representations of the illness, the nurse practitioner (NP) can use the common sense model of illness representation (CSM) to establish interventions and action plans helpful in decreasing distress in the management of symptoms. NPs frequently care for patients who present with very severe symptoms related to their health problem. This becomes a major challenge in effective disease management. Leventhal's CSM can be used as a framework to identify the cognitive and emotional illness representations individuals develop when acute and chronic symptoms are presented. By assessing the individual's cognitive and emotional representations of the illness, the NP will be able to use the CSM to establish interventions and action plans that will be helpful in decreasing the patient's distress in the management of symptoms.

  3. Improving organisational resilience through enterprise security risk management.

    Science.gov (United States)

    Petruzzi, John; Loyear, Rachelle

    Enterprise Security Risk Management (ESRM) is a new philosophy and method of managing security programmes through the use of traditional risk principles. As a philosophy and life cycle, ESRM is focused on creating a business partnership between security practitioners and business leaders to more effectively provide protection against security risks in line with acceptable risk tolerances as defined by business asset owners and stakeholders. This paper explores the basics of the ESRM philosophy and life cycle and also shows how embracing the ESRM philosophy and implementing a risk-based security management model in the business organisation can lead to higher levels of organisational resilience as desired by organisation leaders, executives and the board of directors.

  4. Managing Multiple Risk Factors

    National Research Council Canada - National Science Library

    Lollis, Charlie

    1998-01-01

    ...) contribute to the racial differences in cardiovascular risk and events among women. High levels of socioeconomic stress, higher dietary fat intake and sedentary lifestyle are more prevalent among black than white women...

  5. Knowledge management in support of enterprise risk management

    OpenAIRE

    Rodriguez, Eduardo; Edwards, John S.

    2014-01-01

    Risk management and knowledge management have so far been studied almost independently. The evolution of risk management to the holistic view of Enterprise Risk Management requires the destruction of barriers between organizational silos and the exchange and application of knowledge from different risk management areas. However, knowledge management has received little or no attention in risk management. This paper examines possible relationships between knowledge management constructs relate...

  6. The NASA risk management program

    International Nuclear Information System (INIS)

    Buchbinder, B.; Philipson, L.L.

    1989-01-01

    This paper reports that the NASA Risk Management Program has been established to ensure the appropriate application of risk-based procedures in support of the elimination, reduction, or acceptance of significant safety risks of concern in NASA. The term appropriate is emphasized, in that the particular procedures applied to each given risk are to reflect its character and prioritized importance, the technological and economic feasibility of its treatment. A number of key documents have been produced in support of this implementation. Databases, risk analysis tools, and risk communication procedures requisite to the execution of the risk management functions also are being developed or documented. Several risk management applications have been made and a comprehensive application to a major new NASA program is underway. This paper summarizes the development and current status of the NASA Risk Management Program. Some principal actions that have been carried out in NASA in consonance with the program are noted particularly, and views are presented on the program's likely future directions

  7. How to manage risk better

    CSIR Research Space (South Africa)

    Walwyn, DR

    2002-09-01

    Full Text Available Risk management practices in the R&D departments of many chemical and pharmaceutical companies lack much of the rigor and sophistication of the equivalent corporation in the financial sector. For instance investment decisions on research projects...

  8. Risk Management and Value Creation

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Roggi, Oliviero

    Corporate failures, periodic recessions, regional debt crises and volatile financial markets have intensified the focus on risk management as the means to deal with turbulent conditions. The ability to respond effectively to abrupt environmental impacts is considered an important source...... of competitive advantage. Yet, surprisingly little research has analyzed whether the presumed advantages of effective risk management are associated with superior outcomes. Here we present a comprehensive study of risk management effectiveness and the relationship to corporate performance based on more than 33......,500 observations in 3,400 firms over the turbulent 20-year period 1991-2010. Determining effective risk management as the ability to reduce earnings and cash flow volatility, we find that both have significant positive relationships to lagged performance measures after controlling for industry effects, company...

  9. MANAGING RISKS AND LIABILITIES IN THE HIGHWAYS AND TRANSPORT SECTOR

    OpenAIRE

    P.E. FORMAN, B.Eng.(Hons.), M.Sc., C.Eng.

    2000-01-01

    In recent years, more people have been claiming financial recompense for personal injuries they sustain. Increasingly, the targets of such claims are highway authorities, transport operators and property owners. This paper outlines an area of risk commonly overlooked by practitioners, but which can be managed effectively and can afford both cost savings and public safety improvements. Inconsistencies between design standards, safety improvement policies and maintenance regimes for the more...

  10. Knowledge and skills for management of sexually transmitted infections among rural medical practitioners in Bangladesh.

    Science.gov (United States)

    Alam, Nazmul; Mridha, Malay K; Kristensen, Sibylle; Vermund, Sten H

    2015-04-01

    Sexually transmitted infection (STI) management is considered rudimentary among rural medical practitioners (RMPs) in Bangladesh. We sought to understand the level of knowledge and skills in STI management and to assess the impact of a two-day training orientation among RMPs in Tangail district. Data were collected through a baseline survey of 225 practicing RMPs in the study area and a three-month follow-up survey of 99 RMPs who participated in a two-day STI/HIV orientation training. The level of formal training among RMPs ranged from none (22.7%), to paramedical training (14.7%) and local medical assistant training (62.6%). The baseline survey revealed a low level of STI/HIV knowledge and misconceptions about the transmission of STI/HIV among RMPs. RMPs mostly prescribed first line antibiotics for treatment of common reproductive tract infections (RTIs) including STIs, but they rarely prescribed the correct dosages according to the national RTI/STI management guidelines. Only 3% of RMPs were able to correctly answer all four HIV transmission (unprotected sexual intercourse, blood transfusion, needle sharing and mother to child transmission) questions at baseline, while 94.9% of RMPs answered all four correctly at three months following the training (p=0.001). Only 10% of RMPs reported suggesting the recommended drug (azithromycin) and only 2% mentioned about the recommended dosage (2gm single dose) for the treatment of urethritis/cervicitis; compared to 49.5% suggested azithromycin at follow-up with 39.4% mentioned the recommended 2gm single dose (p=0.001). Our study found low level of knowledge and poor practices related RTI/STI management among RMPs. Short orientation training and education intervention shown promise to increase knowledge and management skills for RTIs/STIs.

  11. Risk assessment and risk management of mycotoxins.

    Science.gov (United States)

    2012-01-01

    Risk assessment is the process of quantifying the magnitude and exposure, or probability, of a harmful effect to individuals or populations from certain agents or activities. Here, we summarize the four steps of risk assessment: hazard identification, dose-response assessment, exposure assessment, and risk characterization. Risk assessments using these principles have been conducted on the major mycotoxins (aflatoxins, fumonisins, ochratoxin A, deoxynivalenol, and zearalenone) by various regulatory agencies for the purpose of setting food safety guidelines. We critically evaluate the impact of these risk assessment parameters on the estimated global burden of the associated diseases as well as the impact of regulatory measures on food supply and international trade. Apart from the well-established risk posed by aflatoxins, many uncertainties still exist about risk assessments for the other major mycotoxins, often reflecting a lack of epidemiological data. Differences exist in the risk management strategies and in the ways different governments impose regulations and technologies to reduce levels of mycotoxins in the food-chain. Regulatory measures have very little impact on remote rural and subsistence farming communities in developing countries, in contrast to developed countries, where regulations are strictly enforced to reduce and/or remove mycotoxin contamination. However, in the absence of the relevant technologies or the necessary infrastructure, we highlight simple intervention practices to reduce mycotoxin contamination in the field and/or prevent mycotoxin formation during storage.

  12. Insights into water managers' perception and handling of uncertainties - a study of the role of uncertainty in practitioners' planning and decision-making

    Science.gov (United States)

    Höllermann, Britta; Evers, Mariele

    2017-04-01

    Planning and decision-making under uncertainty is common in water management due to climate variability, simplified models, societal developments, planning restrictions just to name a few. Dealing with uncertainty can be approached from two sites, hereby affecting the process and form of communication: Either improve the knowledge base by reducing uncertainties or apply risk-based approaches to acknowledge uncertainties throughout the management process. Current understanding is that science more strongly focusses on the former approach, while policy and practice are more actively applying a risk-based approach to handle incomplete and/or ambiguous information. The focus of this study is on how water managers perceive and handle uncertainties at the knowledge/decision interface in their daily planning and decision-making routines. How they evaluate the role of uncertainties for their decisions and how they integrate this information into the decision-making process. Expert interviews and questionnaires among practitioners and scientists provided an insight into their perspectives on uncertainty handling allowing a comparison of diverse strategies between science and practice as well as between different types of practitioners. Our results confirmed the practitioners' bottom up approach from potential measures upwards instead of impact assessment downwards common in science-based approaches. This science-practice gap may hinder effective uncertainty integration and acknowledgement in final decisions. Additionally, the implementation of an adaptive and flexible management approach acknowledging uncertainties is often stalled by rigid regulations favouring a predict-and-control attitude. However, the study showed that practitioners' level of uncertainty recognition varies with respect to his or her affiliation to type of employer and business unit, hence, affecting the degree of the science-practice-gap with respect to uncertainty recognition. The level of working

  13. 76 FR 45724 - Clearing Member Risk Management

    Science.gov (United States)

    2011-08-01

    ... proposed rules address risk management for cleared trades by futures commission merchants, swap dealers... Commission has proposed extensive regulations addressing open access and risk management at the derivatives..., 2011) (Risk Management Requirements for Derivatives Clearing Organizations). These proposed regulations...

  14. Producers' Complex Risk Management Choices

    NARCIS (Netherlands)

    Pennings, J.M.E.; Isengildina, O.; Irwin, S.H.; Garcia, P.; Good, D.L.

    2008-01-01

    Producers have a wide variety of risk management instruments available, making their choice(s) complex. The way producers deal with this complexity can vary and may influence the impact that the determinants, such as risk aversion, have on their choices. A recently developed choice bracketing

  15. Risk assessment and management of radiofrequency radiation exposure

    Energy Technology Data Exchange (ETDEWEB)

    Dabala, Dana [Railways Medical Clinic Cluj-Napoca, Occupational Medicine Department, 16-20 Bilascu Gheorghe St., 400015 Cluj-Napoca (Romania); Surducan, Emanoil; Surducan, Vasile; Neamtu, Camelia [National Institute for Research and Development of Isotopic and Molecular Technologies, 65-103 Donath St., 400293 Cluj-Napoca (Romania)

    2013-11-13

    Radiofrequency radiation (RFR) industry managers, occupational physicians, security department, and other practitioners must be advised on the basic of biophysics and the health effects of RF electromagnetic fields so as to guide the management of exposure. Information on biophysics of RFR and biological/heath effects is derived from standard texts, literature and clinical experiences. Emergency treatment and ongoing care is outlined, with clinical approach integrating the circumstances of exposure and the patient's symptoms. Experimental risk assessment model in RFR chronic exposure is proposed. Planning for assessment and monitoring exposure, ongoing care, safety measures and work protection are outlining the proper management.

  16. Risk assessment and management of radiofrequency radiation exposure

    International Nuclear Information System (INIS)

    Dabala, Dana; Surducan, Emanoil; Surducan, Vasile; Neamtu, Camelia

    2013-01-01

    Radiofrequency radiation (RFR) industry managers, occupational physicians, security department, and other practitioners must be advised on the basic of biophysics and the health effects of RF electromagnetic fields so as to guide the management of exposure. Information on biophysics of RFR and biological/heath effects is derived from standard texts, literature and clinical experiences. Emergency treatment and ongoing care is outlined, with clinical approach integrating the circumstances of exposure and the patient's symptoms. Experimental risk assessment model in RFR chronic exposure is proposed. Planning for assessment and monitoring exposure, ongoing care, safety measures and work protection are outlining the proper management

  17. Legal risk management in shipping

    DEFF Research Database (Denmark)

    Siig, Kristina

    The book discusses the most typical legal challenges met in the chartering, broker, agent or port management part of the shipping industry. It discusses these issues in both English and Scandinavian law and gives indications on how to best ensure your legal risk management in these parts...

  18. General practitioners' management of mental disorders: A rewarding practice with considerable obstacles

    Directory of Open Access Journals (Sweden)

    Fleury Marie-Josée

    2012-03-01

    Full Text Available Abstract Background Primary care improvement is the cornerstone of current reforms. Mental disorders (MDs are a leading cause of morbidity worldwide and widespread in industrialised countries. MDs are treated mainly in primary care by general practitioners (GPs, even though the latter ability to detect, diagnose, and treat patients with MDs is often considered unsatisfactory. This article examines GPs' management of MDs in an effort to acquire more information regarding means by which GPs deal with MD cases, impact of such cases on their practices, factors that enable or hinder MD management, and patient-management strategies. Methods This study employs a mixed-method approach with emphasis on qualitative investigation. Based on a previous survey of 398 GPs in Quebec, Canada, 60 GPs representing a variety of practice settings were selected for further study. A 10-minute-long questionnaire comprising 27 items was administered, and 70-minute-long interviews were conducted. Quantitative (SPSS and qualitative (NVivo analyses were performed. Results At least 20% of GP visits were MD-related. GPs were comfortable managing common MDs, but not serious MDs. GPs' based their treatment of MDs on pharmacotherapy, support therapy, and psycho-education. They used clinical intuition with few clinical tools, and closely followed their patients with MDs. Practice features (salary or hourly fees payment; psycho-social teams on-site; strong informal networks, and GPs' individual characteristics (continuing medical education; exposure and interest in MDs; traits like empathy favoured MD management. Collaboration with psychologists and psychiatrists was considered key to good MD management. Limited access to specialists, system fragmentation, and underdeveloped group practice and shared-care models were impediments. MD management was seen as burdensome because it required more time, flexibility, and emotional investment. Strategies exist to reduce the burden (one

  19. General practitioners' perspectives on management of early-stage chronic kidney disease: a focus group study.

    Science.gov (United States)

    van Dipten, Carola; van Berkel, Saskia; de Grauw, Wim J C; Scherpbier-de Haan, Nynke D; Brongers, Bouke; van Spaendonck, Karel; Wetzels, Jack F M; Assendelft, Willem J J; Dees, Marianne K

    2018-06-06

    Guideline adherence in chronic kidney disease management is low, despite guideline implementation initiatives. Knowing general practitioners' (GPs') perspectives of management of early-stage chronic kidney disease (CKD) and the applicability of the national interdisciplinary guideline could support strategies to improve quality of care. Qualitative focus group study with 27 GPs in the Netherlands. Three analysts open-coded and comparatively analysed the data. Mind-mapping sessions were performed after data-saturation. Five themes emerged: defining CKD, knowledge and awareness, patient-physician interaction, organisation of CKD care and value of the guideline. A key finding was the abstractness of the CKD concept. The GPs expressed various perspectives about defining CKD and interpreting estimated glomerular filtration rates. Views about clinical relevance influenced the decision-making, although factual knowledge seems lacking. Striving to inform well enough without creating anxiety and to explain suitably for the intellectual ability of the patient caused tension in the patient-physician interaction. Integration with cardiovascular disease-management programmes was mentioned as a way of implementing CKD care in the future. The guideline was perceived as a rough guide rather than a leading document. CKD is perceived as an abstract rather than a clinical concept. Abstractness plays a role in all formulated themes. Management of CKD patients in primary care is complex and is influenced by physician-bound considerations related to individual knowledge and perception of the importance of CKD. Strategies are needed to improve GPs' understanding of the concept of CKD by education, a holistic approach to guidelines, and integration of CKD care into cardiovascular programmes. Not applicable.

  20. Delivering and Evaluating On-Line Degree Programs in Culinary Arts/Management: A Survey of Educators and Industry Practitioners

    Science.gov (United States)

    Ryll, Stefan

    2017-01-01

    This quantitative research examines the perceptions of culinary arts/management educators and culinary industry practitioners on the future of online culinary arts education. Specifically pertaining to the recommended procedures by educators and chefs to judge and critique the quality of food products in terms sensory modalities, and what the key…

  1. Price Risk and Risk Management in Agriculture

    Directory of Open Access Journals (Sweden)

    Udo Broll

    2013-06-01

    Full Text Available This note studies the risk-management decisions of a risk-averse farmer. The farmer faces multiple sources of price uncertainty. He sells commodities to two markets at two prices, but only one of these markets has a futures market. We show that the farmer’s optimal commodity futures market position, i.e., a cross-hedge strategy, is actually an over-hedge, a full-hedge, or an under-hedge strategy, depending on whether the two prices are strongly positively correlated, uncorrelated, or negatively correlated, respectively.

  2. Managing Supplier Sustainability Risk

    OpenAIRE

    Harilainen, Hanna-Riitta

    2014-01-01

    Supply chains are increasingly global, often reaching to developing regions. The media pressure brand owners to be responsible, but a product is only as sustainable as the practices of all the companies involved in manufacturing it are. It’s not enough that the brand owner acts responsibly; sustainable practices have to reach component and raw material suppliers upstream. Image risk has often been recognized as reason for investing in sustainability. In the supply chain context, supplier m...

  3. Energy price risk management

    International Nuclear Information System (INIS)

    Evans, J.W.G.

    1998-01-01

    While long term, fixed price contracts for fuel procurement and export of excess power may lock in the economics of a CHP plant, these do not necessarily give the best pricing opportunities that may exist during the life of those contracts. A more prudent approach may be to vary the length of the contracts and markets are now developing in gas and electricity to assist in the management of such a portfolio. (Author)

  4. Underground risk management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Matsuyama, S.; Inoue, M.; Sakai, T.

    2006-03-15

    JCOAL has conducted Joint Research on an Underground Communication and Risk Management Information System with CSIRO of Australia under a commissioned study project for the promotion of coal use starting in fiscal 2002. The goal of this research project is the establishment of a new Safety System focusing on the comprehensive risk management information system by the name of Nexsys. The main components of the system are the Ethernet type underground communication system that represents the data communication base, and the risk management information system that permits risk analysis in real-time and provides decision support based on the collected data. The Nexsys is an open system and is a core element of the underground monitoring system. Using a vast amount of underground data, it is capable of accommodating a wide range of functions that were not available in the past. Because of it, it is possible to construct an advanced underground safety system. 14 figs., 4 tabs.

  5. Comparison of immunization rates of adults ages 65 years and older managed within two nurse practitioner-owned clinics with national immunization rates.

    Science.gov (United States)

    Wright, Wendy L; Morrell, Elise; Lee, Jennie; Cuellar, Norma Graciela; White, Patricia

    2017-07-01

    Adults ages ≥65 years are at increased risk for infectious diseases. Ensuring these individuals are fully vaccinated is imperative. The purpose of this study was to assess the immunization rates of adults ages ≥65 years managed by nurse practitioners (NPs) and compare the results with national immunization rates and Healthy People 2020 goals. A convenience sample of adults ages ≥65 years was obtained from two NP-managed clinics. The vaccine records of each subject were reviewed for documentation of having received five vaccines (tetanus, diphtheria, and pertussis; influenza; pneumococcal polysaccharide vaccine 23; pneumococcal conjugate vaccine 13; and herpes zoster vaccine). One hundred and fifty females (70.8%) and 62 males (29.2%) met inclusion criteria. NP-managed patients had higher immunization rates than the national averages across all five major vaccines. The herpes zoster vaccination rates exceeded the recommendations from Healthy People 2020 whereas pneumococcal and influenza rates were below. The stocking of vaccines within the NP-managed clinics, direct billing to Medicare for Part D vaccines, and previsit care planning likely contributed to the high vaccination rates. These high immunization rates in patients managed by NPs provide support for the important role that NPs play in the care of older adults. ©2017 American Association of Nurse Practitioners.

  6. Risk management for noncombustion wastes

    International Nuclear Information System (INIS)

    Connor, K.K.; Rice, J.S.

    1991-01-01

    The Noncombustion Waste Risk Management Project is designed to incorporate the insights and information developed in these projects into tools that will help utilities make better noncombustion waste management decisions. Specific project goals are to synthesize information useful to utilities on noncombustion wastes, emphasize waste reduction as a priority over end-of-pipe management, develop methods to manage the costs and risks associated with noncombustion wastes (e.g., direct costs, permitting costs, liability costs, public relations costs), develop software and documentation to deliver the information and analysis methods to the industry. This project was initiated EPRI's Environment Division in late 1988. The early phases of the project involved gathering information on current noncombustion waste management practices, specific utility problems and concerns with respect to these wastes, current and potential future regulations, and current and emerging management options. Recent efforts have focused on characterizing the direct and indirect (e.g., lawsuits, remedial action) costs of managing these wastes and on developing and implementing risk management methods for a subset of wastes. The remainder of this paper describes the specific issues addressed by and the results and insights from the three completed waste-specific studies

  7. Tuberculosis management practices of private practitioners in Pune municipal corporation, India.

    Directory of Open Access Journals (Sweden)

    Sandeep Bharaswadkar

    Full Text Available BACKGROUND: Private Practitioners (PP are the primary source of health care for patients in India. Limited representative information is available on TB management practices of Indian PP or on the efficacy of India's Revised National Tuberculosis Control Programme (RNTCP to improve the quality of TB management through training of PP. METHODS: We conducted a cross-sectional survey of a systematic random sample of PP in one urban area in Western India (Pune, Maharashtra. We presented sample clinical vignettes and determined the proportions of PPs who reported practices consistent with International Standards of TB Care (ISTC. We examined the association between RNTCP training and adherence to ISTC by calculating odds ratios and 95% confidence intervals. RESULTS: Of 3,391 PP practicing allopathic medicine, 249 were interviewed. Of these, 55% had been exposed to RNTCP. For new pulmonary TB patients, 63% (158/249 of provider responses were consistent with ISTC diagnostic practices, and 34% (84/249 of responses were consistent with ISTC treatment practices. However, 48% (120/249 PP also reported use of serological tests for TB diagnosis. In the new TB case vignette, 38% (94/249 PP reported use of at least one second line anti-TB drug in the treatment regimen. RNTCP training was not associated with diagnostic or treatment practices. CONCLUSION: In Pune, India, despite a decade of training activities by the RNTCP, high proportions of providers resorted to TB serology for diagnosis and second-line anti-TB drug use in new TB patients. Efforts to achieve universal access to quality TB management must account for the low quality of care by PP and the lack of demonstrated effect of current training efforts.

  8. Tuberculosis management practices of private practitioners in Pune municipal corporation, India.

    Science.gov (United States)

    Bharaswadkar, Sandeep; Kanchar, Avinash; Thakur, Narendra; Shah, Shubhangi; Patnaik, Brinda; Click, Eleanor S; Kumar, Ajay M V; Dewan, Puneet Kumar

    2014-01-01

    Private Practitioners (PP) are the primary source of health care for patients in India. Limited representative information is available on TB management practices of Indian PP or on the efficacy of India's Revised National Tuberculosis Control Programme (RNTCP) to improve the quality of TB management through training of PP. We conducted a cross-sectional survey of a systematic random sample of PP in one urban area in Western India (Pune, Maharashtra). We presented sample clinical vignettes and determined the proportions of PPs who reported practices consistent with International Standards of TB Care (ISTC). We examined the association between RNTCP training and adherence to ISTC by calculating odds ratios and 95% confidence intervals. Of 3,391 PP practicing allopathic medicine, 249 were interviewed. Of these, 55% had been exposed to RNTCP. For new pulmonary TB patients, 63% (158/249) of provider responses were consistent with ISTC diagnostic practices, and 34% (84/249) of responses were consistent with ISTC treatment practices. However, 48% (120/249) PP also reported use of serological tests for TB diagnosis. In the new TB case vignette, 38% (94/249) PP reported use of at least one second line anti-TB drug in the treatment regimen. RNTCP training was not associated with diagnostic or treatment practices. In Pune, India, despite a decade of training activities by the RNTCP, high proportions of providers resorted to TB serology for diagnosis and second-line anti-TB drug use in new TB patients. Efforts to achieve universal access to quality TB management must account for the low quality of care by PP and the lack of demonstrated effect of current training efforts.

  9. Management of dental trauma in primary care: a postal survey of general dental practitioners.

    Science.gov (United States)

    Jackson, N G; Waterhouse, P J; Maguire, A

    2005-03-12

    To determine the self-perceived knowledge and attitudes of general dental practitioners (GDPs) concerning management of dental trauma in primary care. To identify potential barriers to the management of dental trauma in primary care. A self-completion postal questionnaire survey of 417 GDPs in six local health authority districts in northeast England. Likert scale responses to 20 statements designed to test self-perceived knowledge and attitudes. Following descriptive statistical analysis. Factor analysis with principle components analysis was undertaken to identify areas of correlation in questionnaire responses, followed by Chi squared test, Spearman's Rank Correlation and analysis of variance (ANOVA) to measure association between variables. The response rate was 74%. Enamel and dentine fractures were the most common injury, with 45% of GDPs responding seeing more than 10 cases of dental trauma in the preceding year and 53% of respondents seeing one to three cases of complicated crown fracture. Seventy-eight per cent believed that NHS remuneration was inadequate, but only 8% would refer patients with dental trauma to secondary care for this reason. Half of the GDPs believed that trauma could be treated more effectively in practice if NHS payments were greater. GDPs were significantly more likely to agree with this statement if they had previously undertaken a postgraduate course in the treatment of dental trauma (p=0.002). Single handed GDPs were statistically significantly more likely to agree with the statements 'I would not treat dental trauma cases at my practice because the NHS payment is inadequate' (p=0.008) and 'Treating dental trauma at my practice requires too much of my clinical time to be worthwhile' (p=0.002). Ninety-six per cent of GDPs disagreed that treatment of dental trauma rested solely within secondary care. Ninety-six per cent of GDPs agreed that they had a responsibility to provide initial emergency treatment for trauma patients prior to

  10. Risk Management in the Exchange Fund Account

    OpenAIRE

    Michel Rochette

    2002-01-01

    In this article, author Michel Rochette of the Bank's Risk-Management Unit briefly describes the initiatives undertaken to identify, analyze, model, and manage the principal risks inherent in the transactions of the Exchange Fund Account (EFA), where the international reserves of the federal government are held. The author focuses on five types of risk: credit risk, market risk, liquidity risk, operational risk, and legal risk. In addition, the author presents the risk-management principles u...

  11. Managing nuclear supplier risks

    International Nuclear Information System (INIS)

    Ramberg, B.

    1990-01-01

    This paper reports that with the appearance of such third-tier suppliers as Argentina, Brazil, South Korea, Taiwan, China, and others capable of producing nuclear components and sensitive nuclear materials, assurance that importers are using nuclear energy benignly and safely may become more uncertain. It is therefore important to integrate emerging exporters and importers into a regime of norms designed to minimize nuclear risks. The experience of the London Nuclear Suppliers Group (NSG) to arrive at a code of conduct is encouraging. Placed in the context of the larger evolving nuclear energy regime that seeks to address nuclear safety, proliferation, terrorism, and military attacks on reactors, the international community has made substantial progress. Still, there is much that remains to be done

  12. Risk management through concurrency

    International Nuclear Information System (INIS)

    Childress, J.R.; Briant, V.B.

    1991-01-01

    More than ever before, management and technical professionals are concerned with the subtle and dynamic relationships between safety and performance in complex and hazardous industries. This is certainly true in the nuclear power industry. With the US electric energy industry on the verge of deregulation and increased competition, and with a virtual stoppage on building new nuclear power plants, the increasing demand for reliable sources of efficient electric energy is pressing the nuclear utilities to increase production. At the same time, public sentiment and regulatory pressures are increasing their focus on safety at all costs. The purpose of this paper is to present a proven approach to creating a new work culture for improved nuclear safety and performance. The concepts and material which make up this paper have been taken from both authors experience, research, and consulting in the nuclear industry for several years, as well as from over 20 years of consulting work on the relationships between organizational behavior, culture, and productivity

  13. General practitioners knowledge and management of whiplash associated disorders and post-traumatic stress disorder: implications for patient care.

    Science.gov (United States)

    Brijnath, Bianca; Bunzli, Samantha; Xia, Ting; Singh, Nabita; Schattner, Peter; Collie, Alex; Sterling, Michele; Mazza, Danielle

    2016-07-20

    In Australia, general practitioners (GPs) see around two-thirds of people injured in road traffic crashes. Road traffic crash injuries are commonly associated with diverse physical and psychological symptoms that may be difficult to diagnose and manage. Clinical guidelines have been developed to assist in delivering quality, consistent care, however the extent to which GPs knowledge and practice in diagnosing and managing road traffic crash injuries concords with the guidelines is unknown. This study aimed to explore Australian GPs knowledge, attitudes and practices regarding the diagnosis and management of road traffic crash injuries, specifically whiplash associated disorders (WAD) and post-traumatic stress disorder (PTSD). A cross-sectional survey of 423 GPs across Australia conducted between July and December 2014. We developed a questionnaire to assess their knowledge of WAD and PTSD, confidence in diagnosing and managing WAD and PTSD, frequency of referral to health providers, barriers to referral, and attitudes towards further education and training. Factor analysis, Spearman's correlation, and multiple ordered logistic regressions were performed. Overall, GPs have good level knowledge of WAD and PTSD; only 9.6 % (95 % CI: 7.1 %, 12.8 %) and 23.9 % (95 % CI: 20.8 %, 28.2 %) of them were deemed to have lower level knowledge of WAD and PTSD respectively. Key knowledge gaps included imaging indicators for WAD and indicators for psychological referral for PTSD. GPs who were male, with more years of experience, working in the urban area and with higher knowledge level of WAD were more confident in diagnosing and managing WAD. Only GPs PTSD knowledge level predicted confidence in diagnosing and managing PTSD. GPs most commonly referred to physiotherapists and least commonly to vocational rehabilitation providers. Barriers to referral included out-of-pocket costs incurred by patients and long waiting times. Most GPs felt positive towards further education

  14. Education of nurse practitioners in academic nurse-managed centers: student perspectives.

    Science.gov (United States)

    Tanner, Clare L; Pohl, Joanne; Ward, Sheila; Dontje, Kathy

    2003-01-01

    Clinical experiences for advanced practice nurses are increasingly a challenge. Finding settings that demonstrate primary care nursing practice in its finest form can be difficult. This article reports on nurse practitioner (NP) student feedback on clinical placements in the academic nurse-managed centers (ANMCs) associated with four Michigan schools or colleges of nursing. Student feedback was solicited over three years through site and preceptor evaluation tools and focus groups. Students were overwhelmingly satisfied with their experience in ANMCs. Being mentored by an NP preceptor in an ANMC was a valuable experience for students. They valued the role modeling of the NP and the quality of their preceptors' instruction. Students stated that the nursing model of care to which they were exposed was congruent with classroom learning. They reported learning to apply an understanding of their patients' economic, social, and cultural situations to treatment decisions and patient-education efforts and learning to understand the role of community-based care. One limitation of ANMCs from the students' perspective was a relatively low volume of patients, particularly in the initial years. However, the benefit of having time to spend with clients and to reflect on clinical practice was also articulated.

  15. Managing economic risks through simulation

    International Nuclear Information System (INIS)

    Griffin, B.J.; Eresman, R.K.

    1994-01-01

    Industrial operations are commonly managed in terms of such factors as raw material requirements, throughput, equipment reliability, and operator productivity. Simulation can be used to transform standard management performance measures into probabilistic measures which define the associated risks. These results provide valuable insight for effective management of economic risks. Case studies are presented using the Monte Carlo simulation method to demonstrate different applications of simulation techniques, various result formats, and their use for optimizing economic returns. In the first case study, design criteria for a large gas distribution system originally developed from worst-case demand estimates were modelled to provide a risk basis for decisions on alternative upgrading options. In the second, a commercial gas storage facility operation was modelled to develop economic marketing strategies balancing supply and demand requirements from multiple clients. 3 refs

  16. Appraisal of cooperation with a palliative care case manager by general practitioners and community nurses: a cross-sectional questionnaire study.

    Science.gov (United States)

    van der Plas, Annicka G M; Onwuteaka-Philipsen, Bregje D; Vissers, Kris C; Deliens, Luc; Jansen, Wim J J; Francke, Anneke L

    2016-01-01

    To investigate how general practitioners and community nurses value the support that they receive from a nurse case manager with expertise in palliative care, whether they think the case manager is helpful in realizing appropriate care and what characteristics of the patient and case management are associated with this view. For sustainable palliative care in an ageing society, basic palliative care is provided by generalists and specialist palliative care is reserved for complex situations. Acceptance of and cooperation with specialist palliative care providers by the general practitioner and community nurse is pivotal. Cross-sectional questionnaire study. Questionnaire data from 168 general practitioners and 125 community nurses were analysed using chi-square tests, univariate and multivariate logistic regression. Data were gathered between March 2011-December 2013. Of general practitioners, 46% rated the case manager as helpful in realizing care that is appropriate for the patient; for community nurses this was 49%. The case manager did not hinder the process of care and had added value for patients, according to the general practitioners and community nurses. The tasks of the case manager were associated with whether or not the case manager was helpful in realizing appropriate care, whereas patient characteristics and the number of contacts with the case manager were not. General practitioners and community nurses are moderately positive about the support from the case manager. To improve cooperation further, case managers should invest in contact with general practitioners and community nurses. © 2015 John Wiley & Sons Ltd.

  17. Branding and the Risk Management Imperative

    Directory of Open Access Journals (Sweden)

    Fournier Susan

    2018-05-01

    Full Text Available In an increasingly risky socioeconomic environment, management needs to proactively consider brand-related risks. To understand brands as tools for risk management, they need to understand four types of brand risk: brand reputation risk, brand dilution risk, brand cannibalization risk and brand stretch risk.

  18. Branding and the Risk Management Imperative

    OpenAIRE

    Fournier Susan; Srinivasan Shuba

    2018-01-01

    In an increasingly risky socioeconomic environment, management needs to proactively consider brand-related risks. To understand brands as tools for risk management, they need to understand four types of brand risk: brand reputation risk, brand dilution risk, brand cannibalization risk and brand stretch risk.

  19. Supply Chain Risk Management

    OpenAIRE

    Babková, Ivana

    2008-01-01

    Práce se zabývá problematikou řízení rizika v logistických řetězcích se zaměřením na jeden konkrétní článek řetězce. Definuje základní oblasti risk managementu, jeho hlavní aspekty a systém spojitého plánování. Zabývá se bezpečností práce v pojetí EU, České republiky a Velké Británie. V aplikační části uvádí řízení rizika v jednom článku logistického řetězce, skladu poskytovatele logistických služeb ve Velké Británii.

  20. Risk management for industrial safety

    International Nuclear Information System (INIS)

    Novogno, A.

    1989-01-01

    The catastrophic accidents which have occurred in the last decade, in both developed and developing countries, have drawn the attention of decision-makers in the safety area to the urgent necessity to assess and manage risks from hazardous industrial activities which are concentrated in large industrialized areas. The aim of this paper is to review experience gained in conducting studies in the area of 'comparisons of risks in energy systems' and on the practical application of 'cost effectiveness of risk reduction analysis among different energy systems' (case studies). It is also the aim of the paper to discuss and propose a general framework for defining an 'integrated approach' to risk assessment and management in highly industrialized regions within a country. (author)

  1. General Practitioner's Attitudes and Confidence in Managing Patients with Dementia in Singapore.

    Science.gov (United States)

    Subramaniam, Mythily; Ong, Hui Lin; Abdin, Edimansyah; Chua, Boon Yiang; Shafie, Saleha; Siva Kumar, Fiona Devi; Foo, Sophia; Ng, Li Ling; Lum, Alvin; Vaingankar, Janhavi A; Chong, Siow Ann

    2018-03-01

    The number of people living with dementia is increasing globally as a result of an ageing population. General practitioners (GPs), as the front-line care providers in communities, are important stakeholders in the system of care for people with dementia. This commentary describes a study conducted to understand GPs' attitudes and self-perceived competencies when dealing with patients with dementia and their caregivers in Singapore. A set of study information sheet and survey questionnaires were mailed to selected GP clinics in Singapore. The survey, comprising the "GP Attitudes and Competencies Towards Dementia" questionnaire, was administered. A total of 400 GPs returned the survey, giving the study a response rate of 52.3%. About 74% of the GPs (n=296) were seeing dementia patients in their clinics. Almost all the GPs strongly agreed that early recognition of dementia served the welfare of the patients (n=385; 96%) and their relatives (n=387; 97%). About half (51.5%) of the respondents strongly agreed or agreed that they felt confident carrying out an early diagnosis of dementia. Factor analysis of questionnaire revealed 4 factors representing "benefits of early diagnosis and treatment of patients with dementia", "confidence in dealing with patients and caregiver of dementia", "negative perceptions towards dementia care" and "training needs". GPs in Singapore held a generally positive attitude towards the need for early dementia diagnosis but were not equally confident or comfortable about making the diagnosis themselves and communicating with and managing patients with dementia in the primary care setting. Dementia education and training should therefore be a critical step in equipping GPs for dementia care in Singapore. Shared care teams could further help build up GPs' knowledge, confidence and comfort in managing patients with dementia.

  2. Case-specific colleague guidance for general practitioners' management of sickness absence.

    Science.gov (United States)

    Nordhagen, H P; Harvey, S B; Rosvold, E O; Bruusgaard, D; Blonk, R; Mykletun, A

    2017-12-02

    General practitioners (GPs) report sickness absence certification as challenging. They express need for support with functional assessment beyond guidelines and reforms. Case-specific collegial one-to-one guidance for other clinical topics has proved popular with GPs and may be an acceptable and effective way to improve GPs skills and competence in sickness absence certification. To present a new model of case-specific colleague guidance focusing on the management of long-term sickness absence and to describe its feasibility in terms of application and reception among GPs, and also GPs' self-reports of effects on their practice. Randomly selected GPs received case-specific collegial guidance over a 12-month period, in two Norwegian trials, delivered by former GPs employed by the social security administration. We measured reception and perceived effects by GPs' self-report and registered participation and withdrawal rates. The participation rate (n = 165) was 94%, and no GPs withdrew during training. Among the 116 GPs responding to the survey (70%), 112 (97%; 95% CI 92-99) stated they would recommend it to their colleagues. Considerable benefit from the guidance was reported by 68 (59%; 95% CI 50-68). The GPs self-reported other effects on their sickness absence certification, specifically an increased use of part-time sickness absence (Fit-Note equivalent). This model of case-specific colleague guidance to aid GPs' management of long-term sickness absence is feasible and was popular. This type of guidance was perceived by GPs to be somewhat beneficial and to alter their sickness absence certification behaviour, though the true impact requires further testing in controlled trials. © The Author 2017. Published by Oxford University Press on behalf of the Society of Occupational Medicine. All rights reserved. For Permissions, please email: journals.permissions@oup.com

  3. Does risk management contribute to IT project success? A meta-analysis of empirical evidence

    NARCIS (Netherlands)

    de Bakker, K.F.C.; Boonstra, A.; Wortmann, J.C.

    The question whether risk management contributes to IT project success is considered relevant by people from both academic and practitioners' communities already for a long time. This paper presents a meta-analysis of the empirical evidence that either supports or opposes the claim that risk

  4. 12 CFR 917.3 - Risk management.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 917.3 Section 917.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD GOVERNANCE AND MANAGEMENT OF THE FEDERAL HOME LOAN BANKS POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.3 Risk management. (a) Risk management...

  5. [Risk Assessment and Risk Management of Chemicals in China].

    Science.gov (United States)

    Wang, Tie-yu; Zhou, Yun-qiao; Li, Qi-feng; Lü, Yong-long

    2016-02-15

    Risk assessment and risk management have been increasingly approved as an effective approach for appropriate disposal and scientific management of chemicals. This study systematically analyzed the risk assessment methods of chemicals from three aspects including health risk, ecological risk and regional risk. Based on the current situation of classification and management towards chemicals in China, a specific framework of risk management on chemicals was proposed by selecting target chemicals, predominant industries and related stakeholders as the objects. The results of the present study will provide scientific support for improving risk assessment and reasonable management of chemicals in China.

  6. A view on risk management

    International Nuclear Information System (INIS)

    Joksimovich, V.

    1991-01-01

    The world at large has enjoyed the benefits of industrial technology for almost two centuries. The managers of industrial facilities as well as members of the public focused on the benefits and typically ignored or underestimated the inherent risks entailed in deployment of these technologies. Two examples will be given for the sake of illustration. In the chemical industry, the impacts of various chemicals on humans are insufficiently understood. In addition, it was not even known that some hazardous chemicals could be formed in the chemical reactions taking place in various chemical reactors. This is equivalent to not knowing that Cesium-iodide compound can be formed within nuclear fuel nor the impact it might have on humans if released, which is inconceivable in the nuclear industry. In the era of risk recognition, many industrial managers proclaimed that safety is everybody's business. The basic premise behind this was that since everyone is responsible, no one can be blamed for accidents. This is, however, shifting because both economics and litigation are now compelling industrial managers to consider risk in conjunction with the benefit. The government managers in many cases interpreted their charter to reap benefits first and pay the price of risks later; e.g., the case of nuclear weapons production facilities seriously contaminated by radioactive and other hazardous materials. Cost of clean-up was estimated at more than $100 billion. Of course, the authors have similar examples in many other industries, e.g., Superfund project of chemical waste sites. The challenge for the technologists is to maximize the benefit/risk ratio, keeping the risks, real or perceived, acceptably small. This brings us to the issue of acceptable risks, the topic of this paper

  7. Developing Risk Management as a Competitive Capability

    OpenAIRE

    Silva, E.; Wu, Y.; Ojiako, U.

    2013-01-01

    At the level of the firm, three major parameters are found to influence the ability of SMEs to develop risk management competencies; these are enterprise risk management, internal control, and risk culture.

  8. Risk management at GPU Nuclear

    International Nuclear Information System (INIS)

    Long, R.L.

    1991-01-01

    This paper reports on GPU Nuclear. Among other goals, it established the independence of key safety functions as highlighted by the lessons learned from the accident. In particular, an independent Nuclear Assurance Division was established which include Quality Assurance, Training and Education, Emergency Preparedness, and Nuclear Safety Assessment. The latter consisted of corporate and site independent-safety-review groups. As the GPU Nuclear organization matured, a mid-1987 reorganization created an even more focused Planning and Nuclear Safety Division bringing together Nuclear Safety Assessment with Licensing and Regulatory Affairs and Risk Management. The Risk Management Group (RMG), which began its work in fall 1987, was formed to develop a framework for proactive identification, evaluation, and cost-effective reduction and management of risks of all types. The RMG set out to learn as much as possible about risks and their management in nuclear and other high-technology industries. This began with a thorough literature search. It progressed to interviews with individuals and organizations which have demonstrated innovative ideas, experience, and reputations for safe and reliable operation

  9. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  10. Integrated Foreign Exchange Risk Management

    DEFF Research Database (Denmark)

    Aabo, Tom; Høg, Esben; Kuhn, Jochen

    Empirical research has focused on export as a proxy for the exchange rate exposure and the use of foreign exchange derivatives as the instrument to deal with this exposure. This empirical study applies an integrated foreign exchange risk management approach with a particular focus on the role...

  11. CEA: assessment of risk management 2011

    International Nuclear Information System (INIS)

    2012-06-01

    This report proposes an overview of CEA activities in the field of risk management in different areas: impact on the environment, installation safety, management of occupational risks (occupational health and safety), radiological protection of workers, transportation of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of law risks, controls and audits. It finally presents the risk management department

  12. Factors influencing decision of general practitioners and managers to train and employ a nurse practitioner or physician assistant in primary care: a qualitative study.

    Science.gov (United States)

    van der Biezen, Mieke; Derckx, Emmy; Wensing, Michel; Laurant, Miranda

    2017-02-07

    Due to the increasing demand on primary care, it is not only debated whether there are enough general practitioners (GPs) to comply with these demands but also whether specific tasks can be performed by other care providers. Although changing the workforce skill mix care by employing Physician Assistants (PAs) and Nurse Practitioners (NPs) has proven to be both effective and safe, the implementation of those professionals differs widely between and within countries. To support policy making regarding PAs/NPs in primary care, the aim of this study is to provide insight into factors influencing the decision of GPs and managers to train and employ a PA/NP within their organisation. A qualitative study was conducted in 2014 in which 7 managers of out-of-hours primary care services and 32 GPs who owned a general practice were interviewed. Three main topic areas were covered in the interviews: the decision-making process in the organisation, considerations and arguments to train and employ a PA/NP, and the tasks and responsibilities of a PA/NP. Employment of PAs/NPs in out-of-hours services was intended to substitute care for minor ailments in order to decrease GPs' caseload or to increase service capacity. Mangers formulated long-term planning and role definitions when changing workforce skill mix. Lastly, out-of-hours services experienced difficulties with creating team support among their members regarding the employment of PAs/NPs. In general practices during office hours, GPs indented both substitution and supplementation for minor ailments and/or target populations through changing the skill mix. Supplementation was aimed at improving quality of care and extending the range of services to patients. The decision-making in general practices was accompanied with little planning and role definition. The willingness to employ PAs/NPs was highly influenced by an employees' motivation to start the master's programme and GPs' prior experience with PAs/NPs. Knowledge about

  13. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  14. Managing Food Quality Risk in Global Supply Chain: A Risk Management Framework

    Directory of Open Access Journals (Sweden)

    Pablo Jose Arevalo Chavez

    2012-04-01

    Full Text Available Today, the food sector is one of the sectors most vulnerable to intentional contamination by debilitating agents [1]. Some cases of contaminated food have indicated that product quality risk is one of the vulnerabilities in the global supply chain. A series of company scandals, affecting reputation and causing the recall of products and increasing costs have hit the food industry. The obvious problem is that even a minor incident in one part of the chain can have disastrous effects on other parts of the supply chain. Thus, risks are transmitted through the chain. Even though the dangers from members in the supply chain are small, the cumulative effect becomes significant. The aim of this study is to propose an integrated supply chain risk management framework for practitioners that can provide directions for how to evaluate food quality risk in the global supply chain. For validating the proposed model in‐depth, a case study is conducted on a food SME distributor in Central America. The case study investigates how product quality risks are handled according to the proposed framework.

  15. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  16. Reducing the risk, managing safety.

    Science.gov (United States)

    Aldridge, Peter

    2016-02-01

    Fire safety in healthcare premises has always been a challenge to those that discharge this duty. Statutory compliance should be a matter of course, but in an ever increasingly challenged NHS, even this is not a given. While the NHS is driven by managing very complex risk to deliver cutting edge healthcare, providers cannot be risk averse. Which risk, however, takes priority? Here Peter Aldridge, fire and corporate services manager at Leeds Teaching Hospitals NHS Trust, and Secretary to the National Association of Healthcare Fire Officers (NAHFO)--which will this month and next jointly stage fire safety seminars with IHEEM; see page 8--considers the key issues, with input from a fire officer at a leading mental health and community Trust.

  17. Risk Management Practices: The Ghanaian Firms' Perspective ...

    African Journals Online (AJOL)

    Using a quantitative approach the findings of the study are that Ghanaian firms understand risk and risk management. Additionally, operational, liquidity and credit risk are the most dominant risks experienced while risk identification and selection jointly determine risk management practices in Ghana. Based on the findings ...

  18. The Philosophy of Practice for Comprehensive Medication Management: Evaluating Its Meaning and Application by Practitioners.

    Science.gov (United States)

    Pestka, Deborah L; Sorge, Lindsay A; McClurg, Mary Roth; Sorensen, Todd D

    2018-01-01

    Philosophy of practice is the foundation of any patient care practice because it provides a set of professional values and beliefs that guide actions and decisions in practice. Study objectives were to understand how pharmacists providing comprehensive medication management (CMM) describe their philosophy of practice and compare how participants' philosophies align with predefined tenets of a CMM philosophy of practice. An instrument with closed and open-ended items was developed and administered online to the lead pharmacist at 36 clinics participating in a large CMM study. Participants were asked to describe their philosophy of practice, rate how well their current practice activities align with five predefined CMM philosophy of practice tenets, and provide examples of how they carry out each tenet and how they could improve. Responses were coded, and descriptive analysis was used to calculate participants' practice alignment with the five philosophy of practice tenets. Thirty pharmacists completed the instrument. Twelve codes emerged that participants used to describe their philosophy of practice. These codes were mapped to five predefined tenets of a philosophy of practice. Only 3 (10%) participants included all five tenets in their philosophy of practice, 8 (26.7%) included four, 8 (26.7%) included three, 6 (20%) included two, and 5 (16.7%) included one tenet. Overall, participants rated their alignment with the five tenets highly. "Embracing a patient-centered approach" received the highest mean score of 9.17/10; "Meeting a societal need" had the lowest mean score of 8.37/10. Participants described their philosophy of practice with significant variability. CMM requires a single and consistently applied philosophy of practice to guide practice and the role of the practitioner. We propose five core tenets that resulted from this assessment to be embraced by pharmacists providing CMM and included in their philosophy of practice. © 2017 Pharmacotherapy

  19. Several factors influenced general practitioner participation in the implementation of a disease management programme.

    Science.gov (United States)

    Ribe, Anette Riisgaard; Fenger-Grøn, Morten; Vedsted, Peter; Bro, Flemming; Kærsvang, Lone; Vestergaard, Mogens

    2014-09-01

    Disease management programmes (DMPs) require a high degree of participation from general practitioners (GPs) in order to succeed. We aimed to describe the participation among Danish GPs in a DMP. A quality improvement project entitled the Chronic Care Compass (CCC) was introduced in 2010 by the Central Denmark Region. The project was based on DMPs targeting persons suffering from three chronic diseases (diabetes, chronic obstructive pulmonary disease and acute coronary syndrome). All GPs in the region were invited to participate. We obtained data from administrative registries and studied the participation and its association with characteristics of practices and patients. Differences in participation were assessed using binomial regression models. A total of 271 (69.1%) practices participated in the CCC. The participation was 28.9 percentage points (pp) (confidence interval (CI): 14.3; 43.6) lower among GPs who were older than 60 years versus younger than 50 years, 32.2 pp (CI: 19.1; 45.2) lower among GPs who provided few versus many chronic care consultations, 13.7 pp (CI: 1.7; 25.6) lower among GPs with lower versus medium practice gross income, and 16.9 pp (CI:6.1; 27.8) lower among GPs with a patient population with medium versus low degree of socio-economic deprivation. Participation in the CCC was lower among GPs who provided less chronic care, had a lower practice gross income and had a patient population with a higher degree of deprivation. The project was supported by the Research Unit for General Practice, Aarhus University, and the Lundbeck Foundation. not relevant.

  20. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  1. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    Halverson, T.G.

    1998-01-01

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  2. Risk Management for e-Business

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available In the new Internet economy, risk management plays a critical role to protect the organization and its ability to perform their business mission, not just its IT assets. Risk management is the process of identifying risk, assessing risk, and taking steps to reduce risk to an acceptable level. The risk management is an important component of a IT security program. Information and communications technology management and IT security are responsible for ensuring that technology risks are managed appropriately. These risks originate from the deployment and use of IT assets in various ways, such as configuring systems incorrectly or gaining access to restricted software.

  3. Risk Management Practices by Barbadian Banks

    Directory of Open Access Journals (Sweden)

    Anthony Wood

    2013-07-01

    The main findings of the paper are: risk managers perceive risk management as critical to their banks’ performance; the types of risks causing the greatest exposures are credit risk, operational risk, country/sovereign risk, interest rate risk and market risk; there was a high level of success with current risk management practices and these practices have evolved over time in line with the changing economic environment and regulatory updates. Overall, the findings suggest strongly that in light of the current depressed economic climate, banks operating in Barbados are indeed risk-focused or might we say “risk intelligent”.

  4. Tank waste remediation system risk management list

    International Nuclear Information System (INIS)

    Collard, L.B.

    1995-01-01

    The Tank Waste Remedation System (TWRS) Risk Management List and it's subset of critical risks, the Critical Risk Management List, provide a tool to senior RL and WHC management (Level-1 and -2) to manage programmatic risks that may significantly impact the TWRS program. The programmatic risks include cost, schedule, and performance risks. Performance risk includes technical risk, supportability risk (such as maintainability and availability), and external risk (i.e., beyond program control, for example, changes in regulations). The risk information includes a description, its impacts, as evaluation of the likelihood, consequences and risk value, possible mitigating actions, and responsible RL and WHC managers. The issues that typically form the basis for the risks are presented in a separate table and the affected functions are provided on the management lists

  5. Risk Management for Food Allergy

    DEFF Research Database (Denmark)

    Risk Management for Food Allergy is developed by a team of scientists and industry professionals who understand the importance of allergen risk assessment and presents practical, real-world guidance for food manufacturers. With more than 12 million Americans suffering from food allergies and little...... appropriate "safe" thresholds of ingredients, the food industry must take increasingly proactive steps to avoid direct or cross-contamination as well as ensuring that their products are appropriately labeled and identified for those at risk. This book covers a range of critical topics in this area, including...... indication of what is causing that number to continue to grow, food producers, packagers and distributors need to appropriately process, label and deliver their products to ensure the safety of customers with allergic conditions. By identifying risk factors during processing as well as determining...

  6. 42 CFR 441.476 - Risk management.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  7. Surveying perceptions of landslide risk management in Norway

    Science.gov (United States)

    Chiu, Jessica Ka Yi; Eidsvig, Unni

    2016-04-01

    Enhanced precipitation due to climate change leads to increase in both frequency and intensity of landslides in Norway. A proactive approach to risk management is therefore required to significantly reduce the losses associated with landslides. Opinions and perceptions from practitioners on the performance of landslide risk management can provide insights on areas for improvement in the landslide risk management strategies in Norway. The Risk Management Index (RMI), proposed by Cardona et al. (2004), is a well-established method to measure perceptions of disaster management of selected actors holistically. The RMI is measured based on opinion questionnaires to technical staff, decision-makers, and stakeholders involved in all stages of risk reduction strategies. It is a composite index that considers a wide variety of strategies to manage risks, including structural and non-structural measures, acceptance strategies, disaster management, and risk transfer. The RMI method was modified to be implemented in landslide hazards and to fit with Norwegian conditions. An opinion survey was conducted in autumn 2015 to measure perceptions of landslide risk management in Norway. Perceptions were surveyed for two time periods: 2015 and 2050, and are based on national, county, and municipality levels. Based on the survey results, performance of landslide risk management at any administrative levels in Norway is perceived to improve from `significant' in 2015 to `significant' to `outstanding' in 2050. Knowledge and technology, climate, risk perceptions, and anthropogenic activities are mostly considered by respondents for their 2050 perceptions. Several aspects of landslide risk management in Norway can be improved. For example, landslide hazard evaluation and mapping should be prioritised in Norway. Upgrading, retrofitting, and reconstruction of assets may also be included in the landslide risk reduction strategies. In addition, there should be more focus on inter

  8. Probabilistic risk assessment as an aid to risk management

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1982-01-01

    Probabilistic risk assessments are providing important insights into nuclear power plant safety. Their value is two-fold: first as a means of quantifying nuclear plant risk including contributors to risk, and second as an aid to risk management. A risk assessment provides an analytical plant model that can be the basis for performing meaningful decision analyses for controlling safety. It is the aspect of quantitative risk management that makes probabilistic risk assessment an important technical discipline of the future

  9. Considerations on Integrating Risk and Quality Management

    Directory of Open Access Journals (Sweden)

    Maria POPESCU

    2011-03-01

    Full Text Available This paper aims to highlight the links between risk management and quality management and to study the possibility of their integrated approach. The study reviews the evolution of risk approach within organizations and stresses the need to increase the effectiveness of this approach by incorporating risk management methodology in the quality management system. Starting from this idea, the authors present the current state of risk approach into quality management, basic rules of integrated quality-risk management and major difficulties which may arise in the implementation of integrated quality–risk systems.

  10. Managing risks and hazardous in industrial operations

    Energy Technology Data Exchange (ETDEWEB)

    Almaula, S.C. [Woodward-Clyde International, Oakland, CA (United States)

    1996-12-31

    The main objective of this paper is to demonstrate that it makes good business sense to identify risks and hazards of an operation and take appropriate steps to manage them effectively. Developing and implementing an effective risk and hazard management plan also contibutes to other industry requirements and standards. Development of a risk management system, key elements of a risk management plan, and hazards and risk analysis methods are outlined. Comparing potential risk to the cost of prevention is also discussed. It is estimated that the cost of developing and preparing the first risk management plan varies between $50,000 to $200,000. 3 refs., 2 figs., 1 tab.

  11. Hanford Tanks Initiative risk management guide

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1997-01-01

    This project-specific Risk Management Guide describes the general approach and process being used by the HTI Project to manage risk associated with execution of the HTI mission. It includes the initial identification of risk and the quantification of its likelihood and severity of its consequences. It further addresses the formulation of risk mitigation plans, periodic statusing of the Risk Management List, and risk closure

  12. Managing IT Integration Risk in Acquisitions

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Kettinger, William J.

    2016-01-01

    The article discusses a framework for evaluating risk of information technology (IT) integration in acquisitions. Topics include the use of the experience of serial acquirer Trelleborg AB to show the merits of the framework for managing the risk and to determine low-risk acquisitions......, the importance of managing IT integration risk, and various risk areas for acquisition IT integration....

  13. Risk management in microfinance institutions

    OpenAIRE

    Batin, Artyom

    2014-01-01

    In the following paper I have tried to find the correlation between type of ownership and effective risk management in the operations of microfinance institutions in India. The results found are consistent with the current findings of how the type of ownership does not impact both the financial or social performance of MFIs. Dataset of 72 MFIs was acquired from the Microfinance Information Exchange on MFIs and evaluated using an OLS regression. The results show that the type of ownership insi...

  14. Risk management in nuclear power social aspects

    International Nuclear Information System (INIS)

    Sappa, N.N.

    1996-01-01

    Problems connected with safety evaluation and risk management during operation of nuclear power installations are considered. Social aspects of risk assessment of enterprises with increased danger are discussed

  15. Exploring the opinions and perspectives of general practitioners towards the use of social networking sites for concussion management.

    Science.gov (United States)

    Ahmed, Osman; Sullivan, S John; Schneiders, Anthony; Moon, Sam; McCrory, Paul

    2013-03-01

    Social networking sites (SNSs) are increasingly being used for health-related purposes. Many patients now use sites such as Facebook to discuss symptoms, seek support, and search for advice on health conditions, including concussion. Innovative methods of delivering health information using these technologies are starting to emerge and it is important to seek the input of key stakeholder groups (including general practitioners) to establish their feasibility and to highlight areas of concern. This study aimed to seek the opinions of general practitioners towards the use of SNSs in concussion management. Semi-structured interviews were captured with a digital voice recorder and analysed using interpretative description methodology. Participants were general practitioners whose caseload included persons with a concussion between the ages of 16 and 30 years, and who had treated a patient with a concussion in the past 12 months. The clinical experience of the participants ranged from 3 to 35 years and 50% of the participants had a Facebook account themselves. While all participants were positive towards the use of SNSs for this purpose, concerns were raised regarding the issues of privacy and moderation. SNSs, particularly Facebook, have the potential (if correctly utilised) to be a viable adjunct to traditional concussion management programmes. In order for SNSs to be successfully used in this manner, the quality of information shared needs to be accurate and patients using them need to ensure that they get adequate cognitive rest.

  16. Strategic raw materials. Risk management

    International Nuclear Information System (INIS)

    Bertau, Martin; Matschullat, Joerg; Kausch, Peter

    2014-01-01

    This volume is divided into four chapters: (1) Raw material management, (2) Primary raw materials, (3) Secondary raw materials and recycling, (4). Processing and products. The topics for the chapter ''Raw material management'' are: Substitution of raw materials - framework conditions and implementation; Thales: Strategic raw materials; Time for cooperation between the EU and China in raw materials policy; Availability of elements for the semiconductor industry; Market price risks of raw material-intensive companies - identification and management. The topics on the second item ''Primary raw materials'' are: The supply of economic-critical raw materials - A search and analysis for causes; Lithium extraction from primary raw materials - state and perspectives; The global market of rare earths - A balancing act; Rare earth deposits in Namibia; New technologies in exploration and discovery - Focus on activities in Europe. The third chapter, ''Secondary Raw Materials and Recycling'', covered the topics: Technology metals - Systemic Requirements along the recycling chain; Integrated re-use of high-tech and greentech wastes; From the sewage sludge ash to the phosphorus fertilizer RecoPhos P38 in the stress field of waste, fertilizer and soil protection. In chapter 4. ''Processing and products'' are the topics: Treatment and processing of rare earth metals; Processing of mineral resources - opportunities and challenges; Consequences of modern germanium chemistry; Strategic resources - Risk management. A review and outlook with a pinch of fantasy.. [de

  17. The Environmental Scanning Function of Public Relations Practitioners and Participation in Management Decision Making.

    Science.gov (United States)

    Dozier, David M.

    Focusing on the concepts of scanning (gathering information about segments of the public, their reactions to the organization, and their opinions about issues important to the organization), decision making, and roles, a study examined the relationship between environmental scanning and the participation of public relations practitioners in…

  18. Managing the Role Stress of Public Relations Practitioners in International Schools

    Science.gov (United States)

    Bunnell, Tristan

    2006-01-01

    This article examines the diverse role and work of public relations practitioners in the growing body of international schools. It examines evidence of "role stress" in the form of the subsets of role overload, role ambiguity, role conflict and role preparedness. Three particular aspects were identified. The role seems prone to change alongside…

  19. Value at Risk models for Energy Risk Management

    OpenAIRE

    Novák, Martin

    2010-01-01

    The main focus of this thesis lies on description of Risk Management in context of Energy Trading. The paper will predominantly discuss Value at Risk and its modifications as a main overall indicator of Energy Risk.

  20. Risk management in product innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1993-01-01

    In product innovation projects risk management has become increasingly important. Technological and commercial developments ask for effective and efficient product innovation. Systematic diagnosing and management of risks can help to make product innovation projects successful. In this paper a

  1. Drug utilization research and risk management

    NARCIS (Netherlands)

    Mazzaglia, Giampiero; Mol, Peter G. M.; Elseviers, Monique; Wettermark, Björn; Almarsdóttir, Anna Birna; Andersen, Morten; Benko, Ria; Bennie, Marion; Eriksson, Irene; Godman, Brian; Krska, Janet; Poluzzi, Elisabetta; Taxis, Katja; Vlahovic-Palcevski, Vera; Stichele, Robert Vander

    2016-01-01

    Good risk management requires continuous evaluation and improvement of planned activities. The evaluation impact of risk management activities requires robust study designs and carefully selected outcome measures. Key learnings and caveats from drug utilization research should be applied to the

  2. Operational Risk Management and Military Aviation Safety

    National Research Council Canada - National Science Library

    Ashley, Park

    1999-01-01

    .... The Army's Class A aviation mishap rate declined after it implemented risk management (RM) principles in 1987. This reduction caught the attention of Air Force leadership who have since stated that the application of operational risk management...

  3. Implementation of safety management systems in Hong Kong construction industry - A safety practitioner's perspective.

    Science.gov (United States)

    Yiu, Nicole S N; Sze, N N; Chan, Daniel W M

    2018-02-01

    In the 1980s, the safety management system (SMS) was introduced in the construction industry to mitigate against workplaces hazards, reduce the risk of injuries, and minimize property damage. Also, the Factories and Industrial Undertakings (Safety Management) Regulation was introduced on 24 November 1999 in Hong Kong to empower the mandatory implementation of a SMS in certain industries including building construction. Therefore, it is essential to evaluate the effectiveness of the SMS in improving construction safety and identify the factors that influence its implementation in Hong Kong. A review of the current state-of-the-practice helped to establish the critical success factors (CSFs), benefits, and difficulties of implementing the SMS in the construction industry, while structured interviews were used to establish the key factors of the SMS implementation. Results of the state-of-the-practice review and structured interviews indicated that visible senior commitment, in terms of manpower and cost allocation, and competency of safety manager as key drivers for the SMS implementation. More so, reduced accident rates and accident costs, improved organization framework, and increased safety audit ratings were identified as core benefits of implementing the SMS. Meanwhile, factors such as insufficient resources, tight working schedule, and high labor turnover rate were the key challenges to the effective SMS implementation in Hong Kong. The findings of the study were consistent and indicative of the future development of safety management practice and the sustainable safety improvement of Hong Kong construction industry in the long run. Copyright © 2018 National Safety Council and Elsevier Ltd. All rights reserved.

  4. THEORETICAL BASIS FOR MANAGEMENT OF PERSONNEL RISKS

    OpenAIRE

    Haliashova, Katsiaryna

    2017-01-01

    Necessity of personnel risks management is based on research results. The authors' approaches to the determination of personnel risks and to their management have been explored. The author's definition of the concept of "personnel risks" is proposed. A classification of personnel risks is developed depending on the stage of origin and the tasks of the personnel policy, as well as the methods of management personnel risks in the organization. The article presents a methodical approach to perso...

  5. Improving the care of veterans: The role of nurse practitioners in team-based population health management.

    Science.gov (United States)

    Hobson, Alexandra; Curtis, Alexa

    2017-11-01

    Improving healthcare delivery for U.S. veterans is a national priority. The Veterans Health Administration (VHA) employs a variety of team-based, population health strategies to address critical issues in veterans' health including the effective management of chronic disease. Nurse practitioners (NPs) are integral members of the VHA patient care team with a substantial role to play in the organization and delivery of healthcare services for veterans. This report explores the contributions of NPs in team-based, population health strategies within the VHA. This review of the literature examines peer-reviewed articles published between 2006 and 2017 to explore the contributions of NPs in team-based, population health strategies within the VHA. Search words include veterans, VHA, NPs, population health, panel management, and chronic disease. NPs are vital members of the VHA primary care team; however, there is a dearth of available evidence reflecting the unique contribution of NPs within VHA team-based, population health management strategies. The VHA adoption of full practice authority for NP practice provides NPs with an expanded capacity to lead improvements in veterans' health. Future research is needed to fully understand the unique role of the NP in the delivery of population health management strategies for veterans. ©2017 American Association of Nurse Practitioners.

  6. 12 CFR 932.1 - Risk management.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  7. Study of International Standards of Risk Management

    Directory of Open Access Journals (Sweden)

    Dykan Volodymyr L.

    2014-01-01

    Full Text Available The goal of the article lies in the study of existing international standards of risk management, an important factor of improvement of risk management in domestic corporations and enterprises and development of recommendations on application of international standards in Ukraine, in particular, within the framework of building corporate systems of risk management. The conducted study shows that approaches on organisation of the process of risk management, used in standards of risk management, are of general character and differ with the degree of detailing. Their undoubted value in development of risk management in Ukraine is identification of a general direction of building corporate systems of risk management in practice. The said approaches at the national and corporate levels of standardisation in Ukraine within the framework of building corporate systems of risk management would allow improvement of risk management in corporations and enterprises. The prospect of further studies of domestic specialists in the field of risk management is development of the domestic standard of risk management with consideration of modern domestic specific features of development of risk management in Ukraine and leading foreign experience.

  8. Construction Management Risk System (CMRS for Construction Management (CM Firms

    Directory of Open Access Journals (Sweden)

    Kyungmo Park

    2017-02-01

    Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

  9. Managing medical treatment waste and effluent: the point of view of a nuclear medicine practitioner

    International Nuclear Information System (INIS)

    Karcher, G.

    2011-01-01

    The nuclear medicine department of the Nancy CHU hospital is one of the largest in France: 16.000 patients are welcomed each year and 4.000 persons undergo a tomography there. 5 shielded and isolated rooms, dedicated to Iodine 131 treatment, allow the care of 150 to 200 patients each year. The head of the nuclear medicine department gives his meaning about the new regulation on the management of radioactive effluents. According to him, regulations are necessary but the values of the imposed thresholds have to be scientifically justified. Another point is that a lot of money is spent on radiation protection issues while the radioactive risks are almost null, which leads to wasting money. The elaboration of the radioprotection regulations must be made not as a whole but on a specific basis according to the domain: nuclear power plants, research reactors or nuclear medicine, it applies. (A.C.)

  10. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  11. Risk management and audit | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... a well defined strategic and program framework and sound management processes; and ... A Risk Management Committee supports and monitors the Centre's ... placed on our highly qualified staff in our management of human resources.

  12. Understanding Suicide Across the Lifespan: A United States Perspective of Suicide Risk Factors, Assessment & Management.

    Science.gov (United States)

    Steele, Ian H; Thrower, Natasha; Noroian, Paul; Saleh, Fabian M

    2018-01-01

    Suicide is a troubling, preventable phenomenon. Prior to attempts, individuals often seek help, prompting practitioners to perform risk assessments that ideally use evidence-based risk management strategies. A literature review was performed using Harvard Countway Library of Medicine, Google Scholar, PubMed. Key words used were "Forensic Science," "Suicide Risk Management," "Pediatric Suicide Risk Factors," "Adult Suicide Risk Factors," "Geriatric Suicide Risk Factors," "Suicide Risk Assessment." Parameters limited articles to studies/reviews completed in the past twenty years in the United States. Results indicated predictors of suicide in juveniles were insomnia, burdensomeness, and recent conflicts with family or a romantic partner. Adults had greater risk if male, substance abusing, with marital/job loss. Elderly individuals with multiple medical comorbidities, hopelessness, and isolation were at higher risk. Everyone evaluated should be screened for access to firearms. Management of suicide risk involves providing the least restrictive form of treatment which maintains an individual's safety. © 2017 American Academy of Forensic Sciences.

  13. Managing risk with renewable resources

    International Nuclear Information System (INIS)

    Brower, M.C.; Bernow, S.; Duckworth, M.; Spinney, P.; Bell, K.

    1997-01-01

    One approach to managing risk is for a utility company to invest in diverse power sources such as wind power plants. Since wind plants consume no fuel, can be built in relatively small increments with short construction lead times, and generate no pollutants, it is often said that they offer significant protection from risks associated with conventional fossil-fuel power plants. With assistance from Convergence Research, Charles River Associates, and the Tellus Institute, the authors tested this hypothesis by conducting an in-depth analysis of the risk implications of a decision to build a 1,600 MW wind power plant instead of a 400 MW gas-fired combined cycle plant. (The two plants were assumed to have equal firm capacity.) The case study utility was Texas Utilities Electric, a very large investor-owned company serving an area with substantial, high-quality wind resources. The uncertain inputs included fuel prices, environmental regulations (specifically, CO 2 and air pollution controls), wind plant output, conventional plant availability, and load growth. Two different market scenarios were examined: traditional regulation and an unregulated wholesale market characterized either by a power pool or fixed-price contracts of varying duration. Conclusions are striking: under traditional regulation, wind energy provides a net present-value risk-reduction benefit of $3.4 to $7.8/MWh

  14. Managing risks: Seveso and Harrisburg

    International Nuclear Information System (INIS)

    Conrads-Herzog, A.; Krebsbach-Gnath, C.

    1980-01-01

    The publications dealing with the technical, organisation-relevant, and social preconditions for risk strategies rely on second-hand information, i.e. the conclusions which are drawn from the production accident in Seveso and the TMI-accident. A comparison results in common facts as well as in fundamental differences. In contrast to the authorities in Italy the authorities in the United States intervened more rapidly; the management of necessary measures was taken over by the authorities and very good information was given. (DG) [de

  15. 2015/2016 Quality Risk Management Benchmarking Survey.

    Science.gov (United States)

    Waldron, Kelly; Ramnarine, Emma; Hartman, Jeffrey

    2017-01-01

    This paper investigates the concept of quality risk management (QRM) maturity as it applies to the pharmaceutical and biopharmaceutical industries, using the results and analysis from a QRM benchmarking survey conducted in 2015 and 2016. QRM maturity can be defined as the effectiveness and efficiency of a quality risk management program, moving beyond "check-the-box" compliance with guidelines such as ICH Q9 Quality Risk Management , to explore the value QRM brings to business and quality operations. While significant progress has been made towards full adoption of QRM principles and practices across industry, the full benefits of QRM have not yet been fully realized. The results of the QRM Benchmarking Survey indicate that the pharmaceutical and biopharmaceutical industries are approximately halfway along the journey towards full QRM maturity. LAY ABSTRACT: The management of risks associated with medicinal product quality and patient safety are an important focus for the pharmaceutical and biopharmaceutical industries. These risks are identified, analyzed, and controlled through a defined process called quality risk management (QRM), which seeks to protect the patient from potential quality-related risks. This paper summarizes the outcomes of a comprehensive survey of industry practitioners performed in 2015 and 2016 that aimed to benchmark the level of maturity with regard to the application of QRM. The survey results and subsequent analysis revealed that the pharmaceutical and biopharmaceutical industries have made significant progress in the management of quality risks over the last ten years, and they are roughly halfway towards reaching full maturity of QRM. © PDA, Inc. 2017.

  16. Assessment and management of suicide risk in primary care.

    Science.gov (United States)

    Saini, Pooja; While, David; Chantler, Khatidja; Windfuhr, Kirsten; Kapur, Navneet

    2014-01-01

    Risk assessment and management of suicidal patients is emphasized as a key component of care in specialist mental health services, but these issues are relatively unexplored in primary care services. To examine risk assessment and management in primary and secondary care in a clinical sample of individuals who were in contact with mental health services and died by suicide. Data collection from clinical proformas, case records, and semistructured face-to-face interviews with general practitioners. Primary and secondary care data were available for 198 of the 336 cases (59%). The overall agreement in the rating of risk between services was poor (overall κ = .127, p = .10). Depression, care setting (after discharge), suicidal ideation at last contact, and a history of self-harm were associated with a rating of higher risk. Suicide prevention policies were available in 25% of primary care practices, and 33% of staff received training in suicide risk assessments. Risk is difficult to predict, but the variation in risk assessment between professional groups may reflect poor communication. Further research is required to understand this. There appears to be a relative lack of suicide risk assessment training in primary care.

  17. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  18. Does Your Heart Forecast help practitioner understanding and confidence with cardiovascular disease risk communication?

    Science.gov (United States)

    Wells, Sue; Kerr, Andrew; Broadbent, Elizabeth; MacKenzie, Craig; Cole, Karl; McLachlan, Andy

    2011-03-01

    Explaining what cardiovascular disease (CVD) risk means and engaging in shared decision-making regarding risk factor modification is challenging. An electronic CVD risk visualisation tool containing multiple risk communication strategies (Your Heart Forecast) was designed in 2009. To assess whether this tool facilitated explaining CVD risk to primary care patients. Health professionals who accessed a Primary Health Organisation website or who attended educational peer groups over a three-month period were invited to complete questionnaires before and after viewing a four-minute video about the tool. Respondents were asked to make an informed guess of the CVD risk of a 35-year-old patient (actual CVD risk 5%) and rate the following sentence as being true or false: 'If there were 100 people like Mr Andrews, five would go on to have a cardiac event in the next five years.' They also were asked to rank their understanding of CVD risk and confidence in explaining the concept to patients. Fifty health professionals (37 GPs, 12 practice nurses, one other) completed before and after questionnaires. Respondents' CVD risk estimates pre-video ranged from confidence in explaining risk reduced in range and shifted towards greater efficacy. Whether this tool facilitates discussions of CVD risk with patients and improves patient understanding and lifestyle behaviour needs to be evaluated in a randomised trial.

  19. Enterprise Content Management Implementation and Risk

    Directory of Open Access Journals (Sweden)

    Jaroslava Klegová

    2015-01-01

    Full Text Available Enterprise Content Management (ECM solutions are commonly used in many areas such as document management, record management, digital asset management, etc. Key features of ECM systems are capturing, indexing, preserving and retrieving of digital information. The state-of-the- art ECM solution can help revolutionize document management and further automated business processes which can lead to better decisions and competitive advantage. Risk management can reduce project failure and that is why controlling risk in ECM implementation projects is considered to be a major contributor to project success. To manage software risk, the first step is to identify a list of ECM projects’ risks. The present paper provides an overview of ECM implementation risks and contains findings from a small survey on experience of ECM implementation and risk in Czech enterprises. Risk of implementation in the public sector is discussed more deeply with case study examples.

  20. Risk management and energy systems

    International Nuclear Information System (INIS)

    Carlevaro, F.; Romerio, F.

    1992-01-01

    In five sessions the following topics were dealt with: risk problems, risk analysis and evaluation tools, risks in industrial societies, risks of energy production, technological risks, ethics and political-social consensus. figs., tabs., refs

  1. PERFORMANCE IN INTERNAL CONTROL AND RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    JELER (POPA IOANA

    2017-06-01

    Full Text Available The purpose of this article is to highlight the importance of internal control and risk management. In practice, economic entities meet a variety of risks that have the origins from the internal environment or the external one. Although there are different of views on addressing the concept of risk - threats or opportunities, event or action, accordingly uncertain, proposed by specialists in risk management in this article we try to present these issues and identify techniques to counter risks occurrence. In this article we present also means managing risk and why needs to be implemented at institutional level a risk management. The paper concludes by highlight the role of efficient risk management in the company’s management and company's activities.

  2. Calysto: Risk Management for Commercial Manned Spaceflight

    Science.gov (United States)

    Dillaman, Gary

    2012-01-01

    The Calysto: Risk Management for Commercial Manned Spaceflight study analyzes risk management in large enterprises and how to effectively communicate risks across organizations. The Calysto Risk Management tool developed by NASA's Kennedy Space Center's SharePoint team is used and referenced throughout the study. Calysto is a web-base tool built on Microsoft's SharePoint platform. The risk management process at NASA is examined and incorporated in the study. Using risk management standards from industry and specific organizations at the Kennedy Space Center, three methods of communicating and elevating risk are examined. Each method describes details of the effectiveness and plausibility of using the method in the Calysto Risk Management Tool. At the end of the study suggestions are made for future renditions of Calysto.

  3. Commercializing fuel cells: managing risks

    Science.gov (United States)

    Bos, Peter B.

    Commercialization of fuel cells, like any other product, entails both financial and technical risks. Most of the fuel cell literature has focussed upon technical risks, however, the most significant risks during commercialization may well be associated with the financial funding requirements of this process. Successful commercialization requires an integrated management of these risks. Like any developing technology, fuel cells face the typical 'Catch-22' of commercialization: "to enter the market, the production costs must come down, however, to lower these costs, the cumulative production must be greatly increased, i.e. significant market penetration must occur". Unless explicit steps are taken to address this dilemma, fuel cell commercialization will remain slow and require large subsidies for market entry. To successfully address this commercialization dilemma, it is necessary to follow a market-driven commercialization strategy that identifies high-value entry markets while minimizing the financial and technical risks of market entry. The financial and technical risks of fuel cell commercialization are minimized, both for vendors and end-users, with the initial market entry of small-scale systems into high-value stationary applications. Small-scale systems, in the order of 1-40 kW, benefit from economies of production — as opposed to economies to scale — to attain rapid cost reductions from production learning and continuous technological innovation. These capital costs reductions will accelerate their commercialization through market pull as the fuel cell systems become progressively more viable, starting with various high-value stationary and, eventually, for high-volume mobile applications. To facilitate market penetration via market pull, fuel cell systems must meet market-derived economic and technical specifications and be compatible with existing market and fuels infrastructures. Compatibility with the fuels infrastructure is facilitated by a

  4. Managing Risks in Dry Port Operations

    OpenAIRE

    Ciortescu Cezar-Gabriel; Pãvãla?cu Narcis Sebastian

    2012-01-01

    The purpose of this paper is to have an in-depth look into the phenomenon of risk assessment and risk management strategies in managing dry port operations as an integrated part into international containerized freight trade. The fact that world crises take the form of disruptions, bankruptcies, breakdowns, macroeconomic and political changes, and disasters leads to higher risks and makes risk management more and more difficult. This paper aims to discuss the theory behind the dry port concep...

  5. BEHAVIOURAL INSIGHTS INTO SUPPLY CHAIN RISK MANAGEMENT

    OpenAIRE

    Alexandra-Codruta Popescu (Bîzoi); Cristian-Gabriel Bîzoi

    2015-01-01

    Literature has focused largely on the field of supply chain risk management. Numerous risks occur within supply chain management. Until lately, behavioural risks (implying large amount of losses) have been neglected and considered not relevant. In this paper we provide an analysis of the importance of including behavioural research in logistics and supply chain risk management, what has been written so far and potential future research directions. Until now, literature on logistics and supply...

  6. [Acetaminophen: Knowledge, use and overdose risk in urban patients consulting their general practitioner. A prospective, descriptive and transversal study].

    Science.gov (United States)

    Cipolat, Lauriane; Loeb, Ouriel; Latarche, Clotilde; Pape, Elise; Gillet, Pierre; Petitpain, Nadine

    2017-09-01

    Acetaminophen is the most involved active substance in both unintentional and intentional drug poisoning. However, its availability outside community pharmacies is being debated in France. We made, via a self-administered questionnaire, a prospective assessment of knowledge, use and acetaminophen overdose risk in patients consulting their general practitioner, in the Metz Métropole urban area, between May 2015 and February 2016. We estimated the prevalence of potential unintentional overdosage by capture-recapture method. Among 819 responding patients, only 17.9 % had a sufficient knowledge and 20.3 % were at risk for potential unintentional overdose. The risk was higher for patients aged over 55 years or belonging to socioprofessional categories of laborers and inactive. A good knowledge score was a protective factor for overdose risk (P<0.0001). The liver toxicity of acetaminophen was particularly unknown. The prevalence of potential unintentional acetaminophen overdose was estimated at 1 to2 % of the population. Proposing acetaminophen outside of pharmacies cannot be recommended in France in such conditions. Information campaigns are needed to limit the risk of unintentional overdose and its consequences on liver toxicity. Copyright © 2017 Société française de pharmacologie et de thérapeutique. Published by Elsevier Masson SAS. All rights reserved.

  7. Probability concepts in quality risk management.

    Science.gov (United States)

    Claycamp, H Gregg

    2012-01-01

    Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although risk is generally a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management tools are relatively silent on the meaning and uses of "probability." The probability concept is typically applied by risk managers as a combination of frequency-based calculation and a "degree of belief" meaning of probability. Probability as a concept that is crucial for understanding and managing risk is discussed through examples from the most general, scenario-defining and ranking tools that use probability implicitly to more specific probabilistic tools in risk management. A rich history of probability in risk management applied to other fields suggests that high-quality risk management decisions benefit from the implementation of more thoughtful probability concepts in both risk modeling and risk management. Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although "risk" generally describes a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management methodologies and respective tools focus on managing severity but are relatively silent on the in-depth meaning and uses of "probability." Pharmaceutical manufacturers are expanding their use of quality risk management to identify and manage risks to the patient that might occur in phases of the pharmaceutical life cycle from drug development to manufacture, marketing to product discontinuation. A probability concept is typically applied by risk managers as a combination of data-based measures of probability and a subjective "degree of belief" meaning of probability. Probability as

  8. Risk management frameworks for human health and environmental risks.

    Science.gov (United States)

    Jardine, Cindy; Hrudey, Steve; Shortreed, John; Craig, Lorraine; Krewski, Daniel; Furgal, Chris; McColl, Stephen

    2003-01-01

    A comprehensive analytical review of the risk assessment, risk management, and risk communication approaches currently being undertaken by key national, provincial/state, territorial, and international agencies was conducted. The information acquired for review was used to identify the differences, commonalities, strengths, and weaknesses among the various approaches, and to identify elements that should be included in an effective, current, and comprehensive approach applicable to environmental, human health and occupational health risks. More than 80 agencies, organizations, and advisory councils, encompassing more than 100 risk documents, were examined during the period from February 2000 until November 2002. An overview was made of the most important general frameworks for risk assessment, risk management, and risk communication for human health and ecological risk, and for occupational health risk. In addition, frameworks for specific applications were reviewed and summarized, including those for (1)contaminated sites; (2) northern contaminants; (3) priority substances; (4) standards development; (5) food safety; (6) medical devices; (7) prescription drug use; (8) emergency response; (9) transportation; (10) risk communication. Twelve frameworks were selected for more extensive review on the basis of representation of the areas of human health, ecological, and occupational health risk; relevance to Canadian risk management needs; representation of comprehensive and well-defined approaches; generalizability with their risk areas; representation of "state of the art" in Canada, the United States, and/or internationally; and extent of usage of potential usage within Canada. These 12 frameworks were: 1. Framework for Environmental Health Risk Management (US Presidential/Congressional Commission on Risk Assessment and Risk Management, 1997). 2. Health Risk Determination: The Challenge of Health Protection (Health and Welfare Canada, 1990). 3. Health Canada Decision

  9. Credit Risk Evaluation : Modeling - Analysis - Management

    OpenAIRE

    Wehrspohn, Uwe

    2002-01-01

    An analysis and further development of the building blocks of modern credit risk management: -Definitions of default -Estimation of default probabilities -Exposures -Recovery Rates -Pricing -Concepts of portfolio dependence -Time horizons for risk calculations -Quantification of portfolio risk -Estimation of risk measures -Portfolio analysis and portfolio improvement -Evaluation and comparison of credit risk models -Analytic portfolio loss distributions The thesis contributes to the evaluatio...

  10. Differences in risk and protective factors for workplace aggression between male and female clinical medical practitioners in Australia.

    Science.gov (United States)

    Hills, Danny J

    2017-07-01

    Objectives The aim of the present study was to investigate differences in prevalence, as well as risk and protective factors, for exposure to workplace aggression between male and female clinicians in Australian medical practice settings. Methods In a cross-sectional, self-report study in the third wave of the Medicine in Australia: Balancing Employment and Life survey (2010-11), 16327 medical practitioners were sampled, with 9449 (57.9%) respondents working in clinical practice. Using backward stepwise elimination, parsimonious logistic regression models were developed for exposure to aggression from external (patients, patients' relatives or carers and others) and internal (co-workers) sources in the previous 12 months. Results Overall, greater proportions of female than male clinicians experienced aggression from external (Pworkplace aggression between male and female clinicians, including in relation to state and rural location, need to be considered in the development and implementation of efforts to prevent and minimise workplace aggression in medical practice settings. What is known about the topic? Workplace aggression is prevalent in clinical medical settings, but there are conflicting reports about sex-based differences in the extent of exposure, and little evidence on differences in risk and protective factors for exposure to workplace aggression. What does this paper add? Differences in workplace aggression exposure rates between male and female clinicians are highlighted, including when stratified by doctor type. New evidence is reported on differences and similarities in key personal, professional and work-related factors associated with exposure to external and internal aggression. What are the implications for practitioners? In developing strategies for the prevention and minimisation of workplace aggression, consideration must be given to differences between male and female clinicians, including with regard to personality, age and professional

  11. The role of the General Practitioner in weight management in primary care – a cross sectional study in General Practice

    Directory of Open Access Journals (Sweden)

    Young Doris

    2008-12-01

    Full Text Available Abstract Background Obesity has become a global pandemic, considered the sixth leading cause of mortality by the WHO. As gatekeepers to the health system, General Practitioners are placed in an ideal position to manage obesity. Yet, very few consultations address weight management. This study aims to explore reasons why patients attending General Practice appointments are not engaging with their General Practitioner (GP for weight management and their perception of the role of the GP in managing their weight. Methods In February 2006, 367 participants aged between 17 and 64 were recruited from three General Practices in Melbourne to complete a waiting room self – administered questionnaire. Questions included basic demographics, the role of the GP in weight management, the likelihood of bringing up weight management with their GP and reasons why they would not, and their nominated ideal person to consult for weight management. Physical measurements to determine weight status were then completed. The statistical methods included means and standard deviations to summarise continuous variables such as weight and height. Sub groups of weight and questionnaire answers were analysed using the χ2 test of significant differences taking p as Results The population sample had similar obesity co-morbidity rates to the National Heart Foundation data. 74% of patients were not likely to bring up weight management when they visit their GP. Negative reasons were time limitation on both the patient's and doctor's part and the doctor lacking experience. The GP was the least likely person to tell a patient to lose weight after partner, family and friends. Of the 14% that had been told by their GP to lose weight, 90% had cardiovascular obesity related co-morbidities. GPs (15% were 4th in the list of ideal persons to manage weight after personal trainer Conclusion Patients do not have confidence in their GPs for weight management, preferring other health

  12. RISK MANAGEMENT OF GERMAN FRUIT PRODUCERS

    Directory of Open Access Journals (Sweden)

    Annkatrin PORSCH

    2018-03-01

    Full Text Available Horticultural farms in Germany face substantial business risks. However, fruit farms often struggle to implement appropriate risk management processes, and the risk management literature widely has ignored this farm type. The aim of the study was to improve the assessment of risks by farmers and the choice of suitable risk management instruments. Therefore, a risk management process based on subjective probabilities and suitable for small and medium-sized farms was developed, considering the specific needs of family run businesses. An online survey was conducted to achieve a comprehensive view of the risk perception and risk management practices of German fruit producers. Price and production risks are the most relevant risk categories for fruit farmers. However, among single risk sources, those in the people risk category were seen as the most important. Results show significant interactions among risk categories and a significant correlation between loss experience and the rating of risk categories. The assumption that risk averse farmers generally rate risks higher than risk neutral or risk seeking farmers cannot be confirmed. Diversification seems to be the most important risk management instrument for many fruit producers, especially diversification of marketing channels, farm income, and production activities. Further research should focus on the apparent inconsistency between the satisfaction with instruments reported by farmers and the actual implementation of many of them (e.g., hail insurance and anti-hail net. Furthermore, there is a need for research, to develop decision models considering the interactions of risks and risk management instruments, loss experience and risk seeking attitudes.

  13. [Occupational risks perception in professional nursing practitioners at health care center].

    Science.gov (United States)

    Porras-Povedano, Miguel; Santacruz-Hamer, Virginia; Oliva-Reina, Inmaculada

    2014-01-01

    The aim of this study aim is to describe the perception of occupational risks by nursing professionals in health care center. A descriptive cross-sectional study was conducted on a total population of 122 registered nurses (RNs) and 89 certified nurse aides (CNAs). A convenience sample of nursing professionals was recruited with 72 RNs (27 males and 45 females), and 45 CNAs (1 male and 44 females). They were asked about their perception of occupational risks during their everyday work practice. Sex and age variables were considered, as well as work-related accidents and occupational risk prevention training that had been registered in the last five years. The sample mean age was 47.29 ± 7.98 years (RNs, 45.11; and CNAs, 50.77). Main sources of risks as perceived by RNs were those accidents due to biological materials exposure (52.78%), carrying and moving weight (19.44%), and to occupational stress (19.44%); amongst CNAs, those accidents due to carrying and moving weight (44.44%), biological materials exposure (26.67%) and other infections (15.56%) were also mentioned. As regards the overall risks identified by these professionals, 23.08% of them had perceived no risk at all during their work; 35.04% only identified one risk, and 29.06% perceived two risks in their day to day activity, whereas 12.82% identified three or more occupational risks. As a general rule, the nursing professionals tend to underestimate the occupational risks they are exposed to, with biological, musculoskeletal, and occupational-related stress are perceived as the main sources of risks. Copyright © 2013 Elsevier España, S.L. All rights reserved.

  14. CEA - Assessment of risk management 2013

    International Nuclear Information System (INIS)

    Bigot, Bernard; Bonnevie, Edwige; Maillot, Bernard

    2014-06-01

    After some introducing texts by CEA managers, this report proposes a rather detailed overview and presentation of CEA activities, objectives and obtained results in different fields: protection and control of the environment, installation safety, health, safety and radiation protection, transports of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of legal risks, internal controls and audits, activity of the risk management department, CEA activities from research to industry

  15. Cow's milk allergy: evidence-based diagnosis and management for the practitioner.

    Science.gov (United States)

    Lifschitz, Carlos; Szajewska, Hania

    2015-02-01

    This review summarizes current evidence and recommendations regarding cow's milk allergy (CMA), the most common food allergy in young children, for the primary and secondary care providers. The diagnostic approach includes performing a medical history, physical examination, diagnostic elimination diets, skin prick tests, specific IgE measurements, and oral food challenges. Strict avoidance of the offending allergen is the only therapeutic option. Oral immunotherapy is being studied, but it is not yet recommended for routine clinical practice. For primary prevention of allergy, exclusive breastfeeding for at least 4 months and up to 6 months is desirable. Infants with a documented hereditary risk of allergy (i.e., an affected parent and/or sibling) who cannot be breastfed exclusively should receive a formula with confirmed reduced allergenicity, i.e., a partially or extensively hydrolyzed formula, as a means of preventing allergic reactions, primarily atopic dermatitis. Avoidance or delayed introduction of solid foods beyond 4-6 months for allergy prevention is not recommended. For all of those involved in taking care of children's health, it is important to understand the multifaceted aspects of CMA, such as its epidemiology, presentation, diagnosis, and dietary management, as well as its primary prevention.

  16. Assessing hospitals' clinical risk management: Development of a monitoring instrument

    Directory of Open Access Journals (Sweden)

    Pfeiffer Yvonne

    2010-12-01

    Full Text Available Abstract Background Clinical risk management (CRM plays a crucial role in enabling hospitals to identify, contain, and manage risks related to patient safety. So far, no instruments are available to measure and monitor the level of implementation of CRM. Therefore, our objective was to develop an instrument for assessing CRM in hospitals. Methods The instrument was developed based on a literature review, which identified key elements of CRM. These elements were then discussed with a panel of patient safety experts. A theoretical model was used to describe the level to which CRM elements have been implemented within the organization. Interviews with CRM practitioners and a pilot evaluation were conducted to revise the instrument. The first nationwide application of the instrument (138 participating Swiss hospitals was complemented by in-depth interviews with 25 CRM practitioners in selected hospitals, for validation purposes. Results The monitoring instrument consists of 28 main questions organized in three sections: 1 Implementation and organizational integration of CRM, 2 Strategic objectives and operational implementation of CRM at hospital level, and 3 Overview of CRM in different services. The instrument is available in four languages (English, German, French, and Italian. It allows hospitals to gather comprehensive and systematic data on their CRM practice and to identify areas for further improvement. Conclusions We have developed an instrument for assessing development stages of CRM in hospitals that should be feasible for a continuous monitoring of developments in this important area of patient safety.

  17. Assessing hospitals' clinical risk management: Development of a monitoring instrument.

    Science.gov (United States)

    Briner, Matthias; Kessler, Oliver; Pfeiffer, Yvonne; Wehner, Theo; Manser, Tanja

    2010-12-13

    Clinical risk management (CRM) plays a crucial role in enabling hospitals to identify, contain, and manage risks related to patient safety. So far, no instruments are available to measure and monitor the level of implementation of CRM. Therefore, our objective was to develop an instrument for assessing CRM in hospitals. The instrument was developed based on a literature review, which identified key elements of CRM. These elements were then discussed with a panel of patient safety experts. A theoretical model was used to describe the level to which CRM elements have been implemented within the organization. Interviews with CRM practitioners and a pilot evaluation were conducted to revise the instrument. The first nationwide application of the instrument (138 participating Swiss hospitals) was complemented by in-depth interviews with 25 CRM practitioners in selected hospitals, for validation purposes. The monitoring instrument consists of 28 main questions organized in three sections: 1) Implementation and organizational integration of CRM, 2) Strategic objectives and operational implementation of CRM at hospital level, and 3) Overview of CRM in different services. The instrument is available in four languages (English, German, French, and Italian). It allows hospitals to gather comprehensive and systematic data on their CRM practice and to identify areas for further improvement. We have developed an instrument for assessing development stages of CRM in hospitals that should be feasible for a continuous monitoring of developments in this important area of patient safety.

  18. [The relevance of clinical risk management].

    Science.gov (United States)

    Gulino, Matteo; Vergallo, Gianluca Montanari; Frati, Paola

    2011-01-01

    Medical activity includes a risk of possible injury or complications for the patients, that should drive the Health Care Institutions to introduce and/ or improve clinical Risk management instruments. Although Italy is still lacking a National project of Clinical Risk Management, a number of efforts have been made by different Italian Regions to introduce instruments of risk management. In addition, most of National Health Care Institutions include actually a Department specifically in charge to manage the clinical risk. Despite the practical difficulties, the results obtained until now suggest that the risk management may represent a useful instrument to contribute to the reduction of errors in clinical conduct. Indeed, the introduction of adequate instruments of prevention and management of clinical risk may help to ameliorate the quality of health care Institution services.

  19. A cross-sectional study of the knowledge, attitude, and practice of general practitioners regarding dog bite management in nothern India

    Directory of Open Access Journals (Sweden)

    Abhishek Singh

    2013-01-01

    Full Text Available Context: There are many myths and false beliefs associated with wound management. These include application of oils, herbs, and red chilies on wound inflicted by rabid animals, and not washing the wound properly. General practitioners (GPs constitute a key source of medical care in study area and are approached for anti-rabies treatment by victims of animal bites. Aim: The aim of the present study is to assess the knowledge and practices among the general practitioners (GPs regarding dog bite management. Settings and Design : Community-based cross-sectional study. Materials and Methods: The present study was carried out in the private and public clinics of Ambala city from January 2012 to April 2012 using a pre-tested self-administered questionnaire. The study population composed of 100 GPs comprising 45 MBBS or above degree holders (Group 1 and 55 other GPs like BAMS, RMPs, etc (Group 2. Statistical Analysis Used: Interpretation of data was done using percentages and proportions. χ2 -Test was used to test the statistical difference in the knowledge between the two groups. Results: Out of the total, 68% and 29% respondents in Group 1 and Group 2, respectively, correctly told that wound must be washed with soap and water for minimum period of 15 min. A total 71% and 11% respondents in Group 1 and Group 2, respectively, could correctly answer about the target groups for pre-exposure prophylaxis. A total 62% GPs did not know the high-risk groups to whom pre-exposure prophylaxis has to be given. Conclusions: There was an apparent lack of awareness among the GPs regarding appropriate animal wound management and vaccine administration. Reorientation programs and continued medical education for GPs are required to highlight the WHO guidelines regarding treatment of animal bite.

  20. Contradictions Between Risk Management and Sustainable Development

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, Odd Einar; Langhelle, Oluf; Engen, Ole A. [Univ. of Stavanger (Norway). Dept. of Media, Culture and Social Science

    2006-09-15

    The aim of this paper is to discuss how risk management as a methodology and mindset influence on priorities and decisions concerning sustainable development. Management of risks and hazards often rely on partial analysis with a limited time frame. This may lead to a paradoxical situation where risk management and extended use of risk analysis could hamper long term sustainable development. The question is: Does the use of risk and vulnerability analysis (RaV-analysis) hamper or contribute to sustainable development? Because risk management and assessment has a more narrow scope and a limited time perspective based on well established methodologies, the tangible impacts of risk reducing measures in a project is easier to calculate than long-term and intangible impacts on global development. Empirical evidence is still scarce, but our preliminary conclusion is that mainstream risk management and assessments is counterproductive to sustainable development.

  1. Contradictions Between Risk Management and Sustainable Development

    International Nuclear Information System (INIS)

    Olsen, Odd Einar; Langhelle, Oluf; Engen, Ole A.

    2006-01-01

    The aim of this paper is to discuss how risk management as a methodology and mindset influence on priorities and decisions concerning sustainable development. Management of risks and hazards often rely on partial analysis with a limited time frame. This may lead to a paradoxical situation where risk management and extended use of risk analysis could hamper long term sustainable development. The question is: Does the use of risk and vulnerability analysis (RaV-analysis) hamper or contribute to sustainable development? Because risk management and assessment has a more narrow scope and a limited time perspective based on well established methodologies, the tangible impacts of risk reducing measures in a project is easier to calculate than long-term and intangible impacts on global development. Empirical evidence is still scarce, but our preliminary conclusion is that mainstream risk management and assessments is counterproductive to sustainable development

  2. Risk management with options and futures under liquidity risk

    OpenAIRE

    Adam-Müller, A F A; Panaretou, A

    2009-01-01

    Futures hedging creates liquidity risk through marking to market. Liquidity risk matters if interim losses on a futures position have to be financed at a markup over the risk-free rate. This study analyzes the optimal risk management and production decisions of a firm facing joint price and liquidity risk. It provides a rationale for the use of options on futures in imperfect capital markets. If liquidity risk materializes, the firm sells options on futures in order to partly cover this liqui...

  3. Cattle farmers’ perceptions of risk and risk management strategies

    DEFF Research Database (Denmark)

    Bishu, Kinfe G.; O'Reilly, Seamus; Lahiff, Edward

    2018-01-01

    This study analyzes cattle farmers’ perceptions of risk and risk management strategies in Tigray, Northern Ethiopia. We use survey data from a sample of 356 farmers based on multistage random sampling. Factor analysis is employed to classify scores of risk and management strategies, and multiple...... utilization were perceived as the most important strategies for managing risks. Livestock disease and labor shortage were perceived as less of a risk by farmers who adopted the practice of zero grazing compared to other farmers, pointing to the potential of this practice for risk reduction. We find strong...... evidence that farmers engage in multiple risk management practices in order to reduce losses from cattle morbidity and mortality. The results suggest that government strategies that aim at reducing farmers’ risk need to be tailored to specific farm and farmer characteristics. Findings from this study have...

  4. Hazard evaluation and risk management

    International Nuclear Information System (INIS)

    Fritzsche, A.F.

    1986-01-01

    The eigth chapter deals with the actual handling of hazards. The principal issue concerns man's behaviour towards hazards as an individual formerly and today; the evaluation of expected results of both a positive and a negative kind as determined by the individual's values which may differ and vary greatly from one individual to the next. The evaluation of benefit and hazard as well as the risk management resulting from decision-taking are political processes in the democratic state. Formal decision-taking tools play a major role in this process which concerns such central issues like who will participate; how the decision is arrived at; the participation of citizens; specialist knowledge and participation of the general public. (HSCH) [de

  5. Benchmarking Outdoor Expeditionary Program Risk Management Strategies

    Science.gov (United States)

    Meerts-Brandsma, Lisa; Furman, Nate; Sibthorp, Jim

    2017-01-01

    In 2003, the University of Utah and the National Outdoor Leadership School (NOLS) completed a study that developed a risk management taxonomy in the outdoor adventure industry and assessed how different outdoor expeditionary programs (OEPs) managed risk (Szolosi, Sibthorp, Paisley, & Gookin, 2003). By unifying the language around risk, the…

  6. Active Risk Management and Banking Stability

    NARCIS (Netherlands)

    Silva Buston, C.F.

    2013-01-01

    Abstract: This paper analyzes the net impact of two opposing effects of active risk management at banks on their stability: higher risk-taking incentives and better isolation of credit supply from varying economic conditions. We present a model where banks actively manage their portfolio risk by

  7. Risk Management and Financial Derivatives: An Overview

    NARCIS (Netherlands)

    S.M. Hammoudeh (Shawkat); M.J. McAleer (Michael)

    2012-01-01

    textabstractRisk management is crucial for optimal portfolio management. One of the fastest growing areas in empirical finance is the expansion of financial derivatives. The purpose of this special issue on “Risk Management and Financial Derivatives” is to highlight some areas in which novel

  8. Risk management at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Cummings, G.E.; Strait, R.S.

    1993-10-01

    Managing risks at a large national laboratory presents a unique set of challenges. These challenges include the management of a broad diversity of activities, the need to balance research flexibility against management control, and a plethora of requirements flowing from regulatory and oversight bodies. This paper will present the experiences of Lawrence Livermore National Laboratory (LLNL) in risk management and in dealing with these challenges. While general risk management has been practiced successfully by all levels of Laboratory management, this paper will focus on the Laboratory's use of probabilistic safety assessment and prioritization techniques and the integration of these techniques into Laboratory operations

  9. Preventive dentistry: practitioners' recommendations for low-risk patients compared with scientific evidence and practice guidelines.

    Science.gov (United States)

    Frame, P S; Sawai, R; Bowen, W H; Meyerowitz, C

    2000-02-01

    The purpose of this article is to compare published evidence supporting procedures to prevent dental caries and periodontal disease, in low-risk patients, with the actual preventive recommendations of practicing dentists. Methods included (1) a survey questionnaire of general dentists practicing in western New York State concerning the preventive procedures they would recommend and at what intervals for low-risk children, young adults, and older adults; and (2) review of the published, English-language literature for evidence supporting preventive dental interventions. The majority of dentists surveyed recommended semiannual visits for visual examination and probing to detect caries (73% to 79%), and scaling and polishing to prevent periodontal disease (83% to 86%) for low-risk patients of all ages. Bite-wing radiographs were recommended for all age groups at annual or semiannual intervals. In-office fluoride applications were recommended for low-risk children at intervals of 6 to 12 months by 73% of dentists but were recommended for low-risk older persons by only 22% of dentists. Application of sealants to prevent pit and fissure caries was recommended for low-risk children by 22% of dentists. Literature review found no studies comparing different frequencies of dental examinations and bite-wing radiographs to determine the optimal screening interval in low-risk patients. Two studies of the effect of scaling and polishing on the prevention of periodontal disease found no benefit from more frequent than annual treatments. Although fluoride is clearly a major reason for the decline in the prevalence of dental caries, there are no studies of the incremental benefit of in-office fluoride treatments for low-risk patients exposed to fluoridated water and using fluoridated toothpaste. Comparative studies using outcome end points are needed to determine the optimal frequency of dental examinations and bite-wing radiographs for the early detection of caries, and of scaling

  10. Outreach syncope clinic managed by a nurse practitioner: Outcome and cost effectiveness.

    Science.gov (United States)

    Hamdan, Mohamed H; Walsh, Kathleen E; Brignole, Michele; Key, Jamie

    2017-01-01

    Introduction The purpose of this study was to assess the clinical and financial outcomes of a novel outreach syncope clinic. Methods We compared the clinical outcome of the Faint and Fall Clinic at the American Center (January-June 2016) with that of the University of Wisconsin Health and Clinics Faint and Fall Clinic (January 2013-December 2014). The American Center-Faint and Fall Clinic is run solely by a nurse practitioner, assisted by online faint-decision software and consultancy of a faint specialist through video-conferencing. Results Five hundred and twenty-eight consecutive patients were seen at the University of Wisconsin Hospital and Clinics-Faint and Fall Clinic and 68 patients at the American Center-Faint and Fall Clinic. The patients' clinical characteristics were similar except for a lower age in the American Center patients (45 ± 18 vs 51 ± 22, p = 0.03). Overall, a diagnosis was made within 45 days in 70% (95% confidence interval 66-74%) of the University of Wisconsin Hospital and Clinics patients and 69% (95% confidence interval 58-80%) of the American Center patients, ( p = 0.9). A mean of 3.0 ± 1.6 tests per patient was used in the University of Wisconsin Hospital and Clinics group compared to 1.5 ± 0.8 tests per patient in the American Center group, p = 0.001. Over the six-month study period, the total revenue at the American Center was US$152,597 (contribution margin of US$122,393 plus professional revenue of US$30,204). The total cost of the nurse practitioner including benefits was US$66,662 ((US$98,466 salary/year + 35.4% benefits)/2). Total revenue minus expenses resulted in a net profit of US$85,935. Discussion A nurse practitioner-run outreach syncope-clinic equipped with online faint-decision software and consultancy of a faint specialist through vedio-conferencing is feasible and financially self-sustainable. It allows the dissemination of standardized high-quality syncope care to patients who have

  11. Risk factor management: antiatherogenic therapies.

    Science.gov (United States)

    Gielen, Stephan; Sandri, Marcus; Schuler, Gerhard; Teupser, Daniel

    2009-08-01

    Despite the advances in interventional techniques, the management of stable atherosclerosis remains the domain of optimal guideline-oriented therapy. Recent studies on the effects of aggressive lipid lowering on atheroma volume changes using intravascular ultrasound indicate that it is possible to achieve atherosclerosis regression by reaching low-density lipoprotein (LDL) levels less than 75 mg/dl. The pleiotropic anti-inflammatory effects of statins contribute to the reduction of cardiovascular (CV) event observed with aggressive lipid lowering. As a second important strategy to prevent disease progression, lifestyle changes with regular physical exercise are capable of halting the atherosclerotic process and reducing angina symptoms and CV events. Optimal medical therapy, a healthy lifestyle with regular physical exercise, and coronary interventions are not mutually exclusive treatment strategies. Over the last few decades, both have proved to be effective in significantly reducing the CV mortality in the Western world. However, risk factor modification contributed to at least half the effect in the reduction of CV mortality. This figure provides an estimate of what could be achieved if we were to take risk factor modification more seriously - especially in the acute care setting. The knowledge is there: today we have a better understanding on how to stop progression and even induce regression of atherosclerosis. Much research still needs to be done and will be done. In the meantime, however, our primary focus should lie in implementing what is already known. In addition, it is essential not just to treat CV risk factors, but also to treat them to achieve the target values as set by the guidelines of European Society of Cardiology.

  12. Strategies for successful software development risk management

    Directory of Open Access Journals (Sweden)

    Marija Boban

    2003-01-01

    Full Text Available Nowadays, software is becoming a major part of enterprise business. Software development is activity connected with advanced technology and high level of knowledge. Risks on software development projects must be successfully mitigated to produce successful software systems. Lack of a defined approach to risk management is one of the common causes for project failures. To improve project chances for success, this work investigates common risk impact areas to perceive a foundation that can be used to define a common approach to software risk management. Based on typical risk impact areas on software development projects, we propose three risk management strategies suitable for a broad area of enterprises and software development projects with different amounts of connected risks. Proposed strategies define activities that should be performed for successful risk management, the one that will enable software development projects to perceive risks as soon as possible and to solve problems connected with risk materialization. We also propose a risk-based approach to software development planning and risk management as attempts to address and retire the highest impact risks as early as possible in the development process. Proposed strategies should improve risk management on software development projects and help create a successful software solution.

  13. Barriers to managing child and adolescent mental health problems: a systematic review of primary care practitioners' perceptions.

    Science.gov (United States)

    O'Brien, Doireann; Harvey, Kate; Howse, Jessica; Reardon, Tessa; Creswell, Cathy

    2016-10-01

    Mental health problems are common and typically have an early onset. Effective treatments for mental health problems in childhood and adolescence are available, yet only a minority of children who are affected access them. This is of serious concern, considering the far-reaching and long-term negative consequences of such problems. Primary care is usually the first port of call for concerned parents so it is important to understand how primary care practitioners manage child and adolescent mental health problems and the barriers they face. To ascertain primary care practitioners' perceptions of the barriers that prevent effective management of child and adolescent mental health problems. A systematic review of qualitative and quantitative literature in a primary care setting. A database search of peer-reviewed articles using PsycINFO, MEDLINE(®), Embase, and Web of Science, from inception (earliest 1806) until October 2014, was conducted. Additional studies were identified through hand searches and forward-citation searches. Studies needed to have at least one search term in four categories: primary care, childhood/adolescence, mental health, and barriers. A total of 4151 articles were identified, of which 43 were included (30 quantitative studies and 13 qualitative studies). The majority of the barriers related to identification, management, and/or referral. Considerable barriers included a lack of providers and resources, extensive waiting lists, and financial restrictions. The identification of a broad range of significant barriers highlights the need to strengthen the ability to deal with these common difficulties in primary care. There is a particular need for tools and training to aid accurate identification and management, and for more efficient access to specialist services. © British Journal of General Practice 2016.

  14. Risk and/or resilience management

    Directory of Open Access Journals (Sweden)

    Jean-Paul Louisot

    2015-06-01

    Full Text Available Risk management aims at managing all the uncertainties that may interfere with the objectives and missions of the organization. Resilience engineering aims at building its capacity to get over disturbances or stress while keeping the functionalities needed to survive, and possibly thrive. A recently open debate on an Internet blog launched by the risk managers of the Scottish Widows Bank seems to arise from what some professionals see as two competing branches of the management sciences. Whereas through the development of ERM – Enterprise-wide Risk Managementrisk management is emerging at last to become a science, as well as an art and a practice, the mentioned above centered on the role of a newly forged name “resilience management”. This opens a new front of the many debates that could derail the path to maturity of Risk Management as a science and reopen new silos much as Business Impact Analysis, BIA, or continuity management, might do if a clear distinction is not made between science, objectives and tools. However, because organizations are so interconnected today in the supply cloud that it is inevitable that they will face catastrophic risk and this is why resilience needs to be a core objective of any risk management plan? Whereas traditional risk management techniques alone may not be adequate to deal with such pervasive and insipient risk scenarios, resilience is ingrained into ERM

  15. Risk Management in Mergers and Acquisitions

    Directory of Open Access Journals (Sweden)

    Dmitry O. Verdiev

    2015-01-01

    Full Text Available M&A statistics show that less than a third of newly merged companies has realized their planned synergistic effects and increased shareholder value. According to the author, such disgusting situation is due to improper planning and failure of corporate management to understand the importance of risk management in M&A. Lack of practice in identification, evaluation, mitigation and regular monitoring of risks leads to the situation when many companies merge despite the fact that the merger bears substantial risks. Corporate management fails to include risk mitigation expenses in merger costs. In many cases, risk mitigation expenses may be so substantive that the merger loses its attractiveness. Only few companies implement risk management methodology while planning M&A activity. This methodology may anticipate and minimize the consequences of various risk factors that negatively influence integration process. The article suggests an implementation of risk management best practice. This risk management best practice may act as an effective tool of successful realization of synergistic effects in M&A and may be helpful in increasing shareholder value in post-merger period. Risk management is conducted throughout the stages of merger and includes identification, analysis, assessment, management and monitoring of risks. Implementation of risk management at early stages of merger planning significantly decreases uncertainty in relation to achievement of financial and operational goals of newly merged company. The article provides with typical M&A risk matrix that may be adapted for specific M&A project. Risk matrix includes a register of risks sorted by stages of M&A deal, quality assessment of their probability, influence and impact on merger as well as risk mitigation methods.

  16. 77 FR 13585 - Electricity Subsector Cybersecurity Risk Management Process Guideline

    Science.gov (United States)

    2012-03-07

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process Guideline AGENCY... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk... Cybersecurity Risk Management Process Guideline. The primary goal of this guideline is to describe a risk...

  17. Hybrid Risk Management Methodology: A Case Study

    Directory of Open Access Journals (Sweden)

    Jacky Siu-Lun Ting

    2009-10-01

    Full Text Available Risk management is a decision-making process involving considerations of political, social, economic and engineering factors with relevant risk assessments relating to a potential hazard. In the last decade, a number of risk management tools are introduced and employed to manage and minimize the uncertainty and threats realization to the organizations. However, the focus of these methodologies are different; in which companies need to adopt various risk management principles to visualize a full picture of the organizational risk level. Regarding to this, this paper presents a new approach of risk management that integrates Hierarchical Holographic Modeling (HHM, Enterprise Risk Management (ERM and Business Recovery Planning (BCP for identifying and assessing risks as well as managing the consequences of realized residual risks. To illustrate the procedures of the proposed methodology, a logistic company ABC Limited is chosen to serve as a case study Through applying HHM and ERM to investigate and assess the risk, ABC Limited can be better evaluated the potential risks and then took the responsive actions (e.g. BCP to handle the risks and crisis in near future.

  18. Continuous Risk Management: A NASA Program Initiative

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  19. Software And Systems Engineering Risk Management

    Science.gov (United States)

    2010-04-01

    RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software

  20. Implications of Risk Management Practices on Financial ...

    African Journals Online (AJOL)

    Implications of Risk Management Practices on Financial Performance of Sugar ... The respondents were functional heads of the companies under the survey. ... of downside losses in order to minimize the negative impact of risk on returns.

  1. RISK MANAGEMENT MECHANISM OF GRAIN PROCESSING ENTERPRISES

    Directory of Open Access Journals (Sweden)

    I. P. Bogomolova

    2013-01-01

    Full Text Available In article the main characteristics of a control system by risks (the purpose, properties, the principles, requirements are defined, and also the possible mechanism of risk management of the flour-grinding enterprises is considered.

  2. Business managers turn to risk assessment

    International Nuclear Information System (INIS)

    Allen, Frank

    1993-01-01

    Risk assessments have evolved to help technical managers in nuclear and other industries to design and operate plant with safety in mind. However, they are now developing into the area of business management. (author)

  3. Highly Enhanced Risk Management Emergency Satellite

    DEFF Research Database (Denmark)

    Dalmeir, Michael; Gataullin, Yunir; Indrajit, Agung

    HERMES (Highly Enhanced Risk Management Emergency Satellite) is potential European satellite mission for global flood management, being implemented by Technical University Munich and European Space Agency. With its main instrument - a reliable and precise Synthetic Aperture Radar (SAR) antenna...

  4. "If You Don't Do Parking Management .. Forget Your Behaviour Change, It's Not Going to Work.": Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion.

    Directory of Open Access Journals (Sweden)

    Nick Petrunoff

    Full Text Available After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners' perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives.Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis.Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts. Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite.Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take

  5. "If You Don't Do Parking Management .. Forget Your Behaviour Change, It's Not Going to Work.": Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion.

    Science.gov (United States)

    Petrunoff, Nick; Rissel, Chris; Wen, Li Ming

    2017-01-01

    After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners' perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by

  6. Business resilience: Reframing healthcare risk management.

    Science.gov (United States)

    Simeone, Cynthia L

    2015-09-01

    The responsibility of risk management in healthcare is fractured, with multiple stakeholders. Most hospitals and healthcare systems do not have a fully integrated risk management system that spans the entire organizational and operational structure for the delivery of key services. This article provides insight toward utilizing a comprehensive Business Resilience program and associated methodology to understand and manage organizational risk leading to organizational effectiveness and operational efficiencies, with the fringe benefit of realizing sustainable operational capability during adverse conditions. © 2015 American Society for Healthcare Risk Management of the American Hospital Association.

  7. Appraisal of cooperation with a palliative care case manager by general practitioners and community nurses: a cross-sectional questionnaire study.

    NARCIS (Netherlands)

    Plas, A.G.M. van der; Onwuteaka-Philipsen, B.D.; Vissers, K.C.; Deliens, L.; Jansen, W.J.J.; Francke, A.L.

    2016-01-01

    Aims: To investigate how general practitioners and community nurses value the support that they receive from a nurse case manager with expertise in palliative care, whether they think the case manager is helpful in realizing appropriate care and what characteristics of the patient and case

  8. Cardiovascular risk in rheumatoid arthritis: assessment, management and next steps

    Science.gov (United States)

    Zegkos, Thomas; Kitas, George; Dimitroulas, Theodoros

    2016-01-01

    Rheumatoid arthritis (RA) is associated with increased cardiovascular (CV) morbidity and mortality which cannot be fully explained by traditional CV risk factors; cumulative inflammatory burden and antirheumatic medication-related cardiotoxicity seem to be important contributors. Despite the acknowledgment and appreciation of CV disease burden in RA, optimal management of individuals with RA represents a challenging task which remains suboptimal. To address this need, the European League Against Rheumatism (EULAR) published recommendations suggesting the adaptation of traditional risk scores by using a multiplication factor of 1.5 if two of three specific criteria are fulfilled. Such guidance requires proper coordination of several medical specialties, including general practitioners, rheumatologists, cardiologists, exercise physiologists and psychologists to achieve a desirable result. Tight control of disease activity, management of traditional risk factors and lifestyle modification represent, amongst others, the most important steps in improving CV disease outcomes in RA patients. Rather than enumerating studies and guidelines, this review attempts to critically appraise current literature, highlighting future perspectives of CV risk management in RA. PMID:27247635

  9. Probabilistic risk assessment methodology for risk management and regulatory applications

    International Nuclear Information System (INIS)

    See Meng Wong; Kelly, D.L.; Riley, J.E.

    1997-01-01

    This paper discusses the development and potential applications of PRA methodology for risk management and regulatory applications in the U.S. nuclear industry. The new PRA methodology centers on the development of This paper discusses the time-dependent configuration risk profile for evaluating the effectiveness of operational risk management programs at U.S. nuclear power plants. Configuration-risk profiles have been used as risk-information tools for (1) a better understanding of the impact of daily operational activities on plant safety, and (2) proactive planning of operational activities to manage risk. Trial applications of the methodology were undertaken to demonstrate that configuration-risk profiles can be developed routinely, and can be useful for various industry and regulatory applications. Lessons learned include a better understanding of the issues and characteristics of PRA models available to industry, and identifying the attributes and pitfalls in the developement of risk profiles

  10. THE ANALYSIS OF RISK MANAGEMENT PROCESS WITHIN MANAGEMENT

    Directory of Open Access Journals (Sweden)

    ROMANESCU MARCEL LAURENTIU

    2016-10-01

    Full Text Available This article highlights the risk analysis within management, focusing on how a company could practicaly integrate the risks management in the existing leading process. Subsequently, it is exemplified the way of manage risk effectively, which gives numerous advantages to all firms, including improving their decision-making process. All these lead to the conclusion that the degree of risk specific to companies is very high, but if managers make the best decisions then it can diminish it and all business activitiy and its income are not influenced by factors that could disturb in a negative way .

  11. Economic Exposure and Integrated Risk Management

    OpenAIRE

    Miller, Kent D.

    1994-01-01

    Most corporate risk management research focuses on particular risk exposures to the exclusion of other interrelated exposures. By contrast, this study models corporate risk exposures using a multivariate approach integrating the distinct exposures of interest to finance and strategy researchers. The paper addresses the implications of multivariate modeling for corporate risk management, some key methodological issues arising in empirical estimation of corporate economic exposrues, and direc...

  12. PERFORMANCE IN INTERNAL CONTROL AND RISK MANAGEMENT

    OpenAIRE

    JELER (POPA) IOANA; FOCŞAN ELEONORA IONELA; CORICI MARIAN CĂTĂLIN

    2017-01-01

    The purpose of this article is to highlight the importance of internal control and risk management. In practice, economic entities meet a variety of risks that have the origins from the internal environment or the external one. Although there are different of views on addressing the concept of risk - threats or opportunities, event or action, accordingly uncertain, proposed by specialists in risk management in this article we try to present these issues and identify techniques to ...

  13. APPLIED ISSUES ABOUT BANKING RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Elena Geanina Clipici

    2017-09-01

    Full Text Available The following paper emphasizes the need to deepen the understanding of the notion of banking risk management by explaining the significant risks the bank encounters during financial exercises as well as their additional entries. The study of the paper will focus on UniCredit Bank during the years 2014 and  2015 on all types of risks, in which we will provide comprehensive data on how the UniCredit Bank management applies its risk policies.

  14. CEA - Assessment of risk management for 2012

    International Nuclear Information System (INIS)

    Bonnevie, Edwige

    2013-06-01

    This report proposes an overview of the main events, actions performed by the CEA, and facts for 2012 regarding protection and monitoring of the environment, installation safety, occupational health and safety, radiological protection of workers, transportation of hazardous materials, waste management, protection of sites, installations and heritage, emergency situation management, legal risk management, internal controls and audits. It also presents the organisation and action of the risk management department within the CEA

  15. Management Ownership and Risk-Shifting Investment

    OpenAIRE

    Nobuyuki Teshima

    2012-01-01

    This study analyzes the relationship between management ownership and its risk-shifting incentive. We first present a simple model showing that the risk-shifting incentive of management of financially distressed firms increases as the management ownership of the firm increases. Empirically, we test the hypothesis that under the former Japanese Corporate Reorganization Law, firms with higher management ownership are more likely to use legal rather than private reorganization. Since the reorgan...

  16. Enterprise risk management today's leading research and best practices for tomorrow's executives

    CERN Document Server

    Simkins, Betty J

    2010-01-01

    Essential insights on the various aspects of enterprise risk management If you want to understand enterprise risk management from some of the leading academics and practitioners of this exciting new methodology, Enterprise Risk Management is the book for you. Through in–depth insights into what practitioners of this evolving business practice are actually doing as well as anticipating what needs to be taught on the topic, John Fraser and Betty Simkins have sought out the leading experts in this field to clearly explain what enterprise risk management is and how you can teach, learn, and implement these leading practices within the context of your business activities. In this book, the authors take a broad view of ERM, or what is called a holistic approach to ERM. Enterprise Risk Management introduces you to the wide range of concepts and techniques for managing risk in a holistic way that correctly identifies risks and prioritizes the appropriate responses. This invaluable guide offers a broad overview of...

  17. Feedback on flood risk management

    Science.gov (United States)

    Moreau, K.; Roumagnac, A.

    2009-09-01

    For several years, as floods were increasing in South of France, local communities felt deprive to assume their mission of protection and information of citizens, and were looking for assistance in flood management. In term of flood disaster, the fact is that physical protection is necessary but inevitably limited. Tools and structures of assistance to anticipation remain slightly developed. To manage repeated crisis, local authorities need to be able to base their policy against flood on prevention, warnings, post-crisis analysis and feedback from former experience. In this objective, after 3 years of test and improvement since 2003, the initiative Predict-Services was developped in South of France: it aims at helping communities and companies to face repeated flood crisis. The principle is to prepare emergency plans, to organize crisis management and reduce risks; to help and assist communities and companies during crisis to activate and adapt their emergency plans with enough of anticipation; and to analyse floods effects and improve emergency plans afterwards. In order to reduce risks, and to keep the benefits of such an initiative, local communities and companies have to maintain the awareness of risk of the citizens and employees. They also have to maintain their safety plans to keep them constantly operational. This is a part of the message relayed. Companies, Local communities, local government authorities and basin stakeholders are the decision makers. Companies and local communities have to involve themselves in the elaboration of safety plans. They are also completely involved in their activation that is their own responsability. This applies to other local government authorities, like districts one's and basin stakeholders, which participle in the financing community safety plans and adminitrative district which are responsible of the transmission of meteorological alert and of rescue actions. In the crossing of the géo-information stemming from the

  18. Risk Management for the International Space Station

    Science.gov (United States)

    Sebastian, J.; Brezovic, Philip

    2002-01-01

    The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

  19. Social Risk and the Management of MNCs

    DEFF Research Database (Denmark)

    Taarup Esbensen, Jacob

    2015-01-01

    Multinational companies (MNCs) are increasing being exposed to risk that originate from local communities in the business environment where they operate. The response has been to implement systems for stakeholder engagement by including social issues into their risk management systems. However......” systems, which are based on the capability to identify frames and sensemaking processes. This paper show how social risk management can be conventionalised using distinct theoretical domains taking its outset in a sociological perspective on risk, linking International Business (IB) risk management...

  20. Lack of asthma and rhinitis control in general practitioner-managed patients prescribed fixed-dose combination therapy in Australia.

    Science.gov (United States)

    Bosnic-Anticevich, Sinthia; Kritikos, Vicky; Carter, Victoria; Yan, Kwok Yin; Armour, Carol; Ryan, Dermot; Price, David

    2018-06-01

    The first aim of the study (i) assess the current asthma status of general-practitioner-managed patients receiving regular fixed-dose combination inhaled corticosteroid and long-acting beta 2 agonist (FDC ICS/LABA) therapy and (ii) explore patients' perceptions of asthma control and attitudes/behaviors regarding preventer inhaler use. A cross-sectional observational study of Australian adults with a current physician diagnosis of asthma receiving ≥2 prescriptions of FDC ICS/LABA therapy in the previous year, who were recruited through general practice to receive a structured in-depth asthma review between May 2012 and January 2014. Descriptive statistics and Chi-Square tests for independence were used for associations across asthma control levels. Only 11.5% of the patients had controlled asthma based on guideline-defined criteria. Contrarily, 66.5% of the patients considered their asthma to be well controlled. Incidence of acute asthma exacerbations in the previous year was 26.5% and 45.6% of the patients were without a diagnosis of rhinitis. Asthma medication use and inhaler technique were sub-optimal; only 41.0% of the preventer users reported everyday use. The side effects of medication were common and more frequently reported among uncontrolled and partially controlled patients. The study revealed the extent to which asthma management needs to be improved in this patient cohort and the numerous unmet needs regarding the current state of asthma care. Not only there is a need for continuous education of patients, but also education of health care practitioners to better understand the way in which patient's perceptions impact on asthma management practices, incorporating these findings into clinical decision making.

  1. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  2. The total theory about risk management

    International Nuclear Information System (INIS)

    Furuya, Shunsuke

    2003-01-01

    A general working procedure of risk management, some example of other countries, topics and problems in the future are described. A definition of risk, risk assessment, risk management process, setting of aim and definite policy are explained. As a fundamental way of thinking, risk is controlled by ALARP (As Low As Reasonably Practicable). The upper and lower limit of risk level is called as Quantitative Safety Goal and Target Level of Safety, respectively. These limits in the atomic power and airplane are decided. Evaluation of risk, countermeasure and practice are explained. For example, a permissible range of risk and practical use in England, U.S.A, Holland and Japan are stated. Recently, accountability risk, missing demand risk and control risk are important. (S.Y.)

  3. Development of computerized risk management tool

    International Nuclear Information System (INIS)

    Kil Yoo Kim; Mee Jung Hwang; Seung Cheol Jang; Sang Hoon Han; Tae Woon Kim

    1997-01-01

    The author describes the kinds of efforts for the development of computerized risk management tool; (1) development of a risk monitor, Risk Monster, (2) improvement of McFarm (Missing Cutsets Finding Algorithm for Risk Monitor) and finally (3) development of reliability database management system, KwDBMan. Risk Monster supports for plant operators and maintenance schedulers to monitor plant risk and to avoid high peak risk by rearranging maintenance work schedule. Improved McFarm significantly improved calculation speed of Risk Monster for the cases of supporting system OOS (Out Of Service). KwDBMan manages event data, generic data and CCF (Common Cause Failure) data to support Risk Monster as well as PSA tool, KIRAP (KAERI Integrated Reliability Analysis Package)

  4. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  5. Roles and practices of general practitioners and psychiatrists in management of depression in the community

    Directory of Open Access Journals (Sweden)

    Blin Patrick

    2006-01-01

    Full Text Available Abstract Background Little is known about depressed patients' profiles and how they are managed. The aim of the study is to compare GPs and psychiatrists for 1° sociodemographic and clinical profile of their patients considered as depressed 2° patterns of care provision. Methods The study design is an observational cross-sectional study on a random sample of GPs and psychiatrists working in France. Consecutive inclusion of patients seen in consultation considered as depressed by the physician. GPs enrolled 6,104 and psychiatrists 1,433 patients. Data collected: sociodemographics, psychiatric profile, environmental risk factors of depression and treatment. All clinical data were collected by participating physicians; there was no direct independent clinical assessment of patients to check the diagnosis of depressive disorder. Results Compared to patients identified as depressed by GPs, those identified by psychiatrists were younger, more often urban (10.5% v 5.4% – OR = 2.4, educated (42.4% v 25.4% – OR = 3.9, met DSM-IV criteria for depression (94.6% v 85.6% – OR = 2.9, had been hospitalized for depression (26.1% v 15.6% – OR = 2.0 and were younger at onset of depressive problems (all adjusted p Compared to GPs, psychiatrists more often prescribed tricyclics and very novel antidepressants (7.8% v 2.3% OR = 5.0 and 6.8% v 3.0% OR = 3.8 with longer duration of antidepressant treatment. GPs' patients received more "non-conventional" treatment (8.8% v 2.4% OR = 0.3 and less psychotherapy (72.2% v 89.1% OR = 3.1 (all adjusted p Conclusion Differences between patients mainly concerned educational level and area of residence with few differences regarding clinical profile. Differences between practices of GPs and psychiatrists appear to reflect more the organization of the French care system than the competence of providers.

  6. Risk management method for small photovoltaic plants

    Directory of Open Access Journals (Sweden)

    Kirova Milena

    2016-09-01

    Full Text Available Risk management is necessary for achieving the goals of the organization. There are many methods, approaches, and instruments in the literature concerning risk management. However, these are often highly specialized and transferring them to a different field can prove difficult. Therefore, managers often face situations where they have no tools to use for risk management. This is the case with small photovoltaic plants (according to a definition by the Bulgarian State Energy and Water Regulatory Commission small applies to systems with a total installed power of 200 kWp. There are some good practices in the energy field for minimizing risks, but they offer only partial risk prevention and are not sufficient. Therefore a new risk management method needs to be introduced. Small photovoltaic plants offer plenty of advantages in comparison to the other renewable energy sources which makes risk management in their case more important. There is no classification of risks for the exploitation of small photovoltaic systems in the available literature as well as to what degree the damages from those risks could spread. This makes risk analysis and evaluation necessary for obtaining information which could aid taking decisions for improving risk management. The owner of the invested capital takes a decision regarding the degree of acceptable risk for his organization and it must be protected depending on the goals set. Investors in small photovoltaic systems need to decide to what degree the existing risks can influence the goals previously set, the payback of the investment, and what is the acceptable level of damages for the investor. The purpose of this work is to present a risk management method, which currently does not exist in the Bulgaria, so that the risks and the damages that could occur during the exploitation of small photovoltaic plants could be identified and the investment in such technology – justified.

  7. Role of NDT in risk management

    International Nuclear Information System (INIS)

    Porter, Jr. James F.

    2009-01-01

    Risk management is identifying and then managing threats that could severely affect or bring down a company. This involves reviewing the operations of the company to include the process, equipment, procedures and personnel. Potential threats are then identified including their probability of occurrence, and then taking appropriate actions to address the most likely threats. Traditionally, risk management was thought of as mostly getting the right insurance. However, this impression of risk management has changed dramatically. With the recent increase in rules and regulations and optimizing utilization of key resources, risk management is becoming a management practice that is as important as financial or facilities management. In ideal risk management, a prioritization process is followed whereby the risks with the greatest loss and greatest probability of occurring are handled first, and risks with lower probability of occurrence and lower loss are handled in descending order. In practice the process can be very difficult, and balancing between risks with a high probability of occurrence but lower loss versus a risk with high but lower probability of occurrence can often be mishandled. (author)

  8. Financial risk management of pharmacy benefits.

    Science.gov (United States)

    Saikami, D

    1997-10-01

    Financial risk management of pharmacy benefits in integrated health systems is explained. A managed care organization should assume financial risk for pharmacy benefits only if it can manage the risk. Horizontally integrated organizations often do not have much control over the management of drug utilization and costs. Vertically integrated organizations have the greatest ability to manage pharmacy financial risk; virtual integration may also be compatible. Contracts can be established in which the provider is incentivized or placed at partial or full risk. The main concerns that health plans have with respect to pharmacy capitation are formulary management and the question of who should receive rebates from manufacturers. The components needed to managed pharmacy financial risk depend on the type of contract negotiated. Health-system pharmacists are uniquely positioned to take advantage of opportunities opening up through pharmacy risk contracting. Functions most organizations must provide when assuming pharmacy financial risk can be divided into internal and external categories. Internally performed functions include formulary management, clinical pharmacy services and utilization management, and utilization reports for physicians. Functions that can be outsourced include claims processing and administration, provider- and customer support services, and rebates. Organizations that integrate the pharmacy benefit across the health care continuum will be more effective in controlling costs and improving outcomes than organizations that handle this benefit as separate from others. Patient care should not focus on payment mechanisms and unit costs but on developing superior processes and systems that improve health care.

  9. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  10. Risk management in a competitive electricity market

    International Nuclear Information System (INIS)

    Liu, Min; Wu, Felix F.

    2007-01-01

    In a competitive electricity market, it is necessary and important to develop an appropriate risk management scheme for trade with full utilization of the multi-market environment in order to maximize participants' benefits and minimize the corresponding risks. Based on the analyses to trading environments and risks in the electricity market, a layered framework of risk management for electric energy trading is proposed in this paper. Simulation results confirmed that trading among multiple markets is helpful to reduce the complete risk, and VaR provides a useful approach to judge whether the formed risk-control scheme is acceptable. (author)

  11. INVENTORY AND RISK MANAGEMENT: DECREASING DELIVERY RISK OF PURCHASERS

    Directory of Open Access Journals (Sweden)

    Grzegorz MICHALSKI

    2008-12-01

    Full Text Available The basic financial purpose of an enterprise is maximization of its value. Inventory management should also contribute to realization of this fundamental aim. The enterprise value maximization strategy is executed with a focus on risk and uncertainty. This article presents the consequences for the recipients firm that can result from operating risk that is related to delivery risk generated by the suppliers. The present article offers a method that uses portfolio management theory to choose the suppliers.

  12. Comparing Textbook Coverage of Lean Management to Academic Research and Industry Practitioner Perceptions

    Science.gov (United States)

    Marley, Kathryn A.; Stodnick, T. Michael; Heyl, Jeff

    2013-01-01

    Within operations management courses, most instructors choose to devote classroom time to teaching the topic of lean management. However, because the amount of time available for instructors to devote to this topic varies considerably, there is a great deal of latitude on which specific lean tools and techniques should be discussed. The authors…

  13. Data Management in Metagenomics: A Risk Management Approach

    Directory of Open Access Journals (Sweden)

    Filipe Ferreira

    2014-07-01

    Full Text Available In eScience, where vast data collections are processed in scientific workflows, new risks and challenges are emerging. Those challenges are changing the eScience paradigm, mainly regarding digital preservation and scientific workflows. To address specific concerns with data management in these scenarios, the concept of the Data Management Plan was established, serving as a tool for enabling digital preservation in eScience research projects. We claim risk management can be jointly used with a Data Management Plan, so new risks and challenges can be easily tackled. Therefore, we propose an analysis process for eScience projects using a Data Management Plan and ISO 31000 in order to create a Risk Management Plan that can complement the Data Management Plan. The motivation, requirements and validation of this proposal are explored in the MetaGen-FRAME project, focused in Metagenomics.

  14. Overview of Risk Management for Engineered Nanomaterials

    International Nuclear Information System (INIS)

    Schulte, P A; Geraci, C L; Hodson, L L; Zumwalde, R D; Kuempel, E D; Murashov, V; Martinez, K F; Heidel, D S

    2013-01-01

    Occupational exposure to engineered nanomaterials (ENMs) is considered a new and challenging occurrence. Preliminary information from laboratory studies indicates that workers exposed to some kinds of ENMs could be at risk of adverse health effects. To protect the nanomaterial workforce, a precautionary risk management approach is warranted and given the newness of ENMs and emergence of nanotechnology, a naturalistic view of risk management is useful. Employers have the primary responsibility for providing a safe and healthy workplace. This is achieved by identifying and managing risks which include recognition of hazards, assessing exposures, characterizing actual risk, and implementing measures to control those risks. Following traditional risk management models for nanomaterials is challenging because of uncertainties about the nature of hazards, issues in exposure assessment, questions about appropriate control methods, and lack of occupational exposure limits (OELs) or nano-specific regulations. In the absence of OELs specific for nanomaterials, a precautionary approach has been recommended in many countries. The precautionary approach entails minimizing exposures by using engineering controls and personal protective equipment (PPE). Generally, risk management utilizes the hierarchy of controls. Ideally, risk management for nanomaterials should be part of an enterprise-wide risk management program or system and this should include both risk control and a medical surveillance program that assesses the frequency of adverse effects among groups of workers exposed to nanomaterials. In some cases, the medical surveillance could include medical screening of individual workers to detect early signs of work-related illnesses. All medical surveillance should be used to assess the effectiveness of risk management; however, medical surveillance should be considered as a second line of defense to ensure that implemented risk management practices are effective.

  15. Overview of Risk Management for Engineered Nanomaterials

    Science.gov (United States)

    Schulte, P. A.; Geraci, C. L.; Hodson, L. L.; Zumwalde, R. D.; Kuempel, E. D.; Murashov, V.; Martinez, K. F.; Heidel, D. S.

    2013-04-01

    Occupational exposure to engineered nanomaterials (ENMs) is considered a new and challenging occurrence. Preliminary information from laboratory studies indicates that workers exposed to some kinds of ENMs could be at risk of adverse health effects. To protect the nanomaterial workforce, a precautionary risk management approach is warranted and given the newness of ENMs and emergence of nanotechnology, a naturalistic view of risk management is useful. Employers have the primary responsibility for providing a safe and healthy workplace. This is achieved by identifying and managing risks which include recognition of hazards, assessing exposures, characterizing actual risk, and implementing measures to control those risks. Following traditional risk management models for nanomaterials is challenging because of uncertainties about the nature of hazards, issues in exposure assessment, questions about appropriate control methods, and lack of occupational exposure limits (OELs) or nano-specific regulations. In the absence of OELs specific for nanomaterials, a precautionary approach has been recommended in many countries. The precautionary approach entails minimizing exposures by using engineering controls and personal protective equipment (PPE). Generally, risk management utilizes the hierarchy of controls. Ideally, risk management for nanomaterials should be part of an enterprise-wide risk management program or system and this should include both risk control and a medical surveillance program that assesses the frequency of adverse effects among groups of workers exposed to nanomaterials. In some cases, the medical surveillance could include medical screening of individual workers to detect early signs of work-related illnesses. All medical surveillance should be used to assess the effectiveness of risk management; however, medical surveillance should be considered as a second line of defense to ensure that implemented risk management practices are effective.

  16. Correlates of MSW Students’ Perceptions of Preparedness to Manage Risk and Personal Liability

    Directory of Open Access Journals (Sweden)

    Michael N. Kane

    2002-12-01

    Full Text Available Few studies in the discipline of social work have identified correlates of preparedness to manage risk and personal liability among practitioners or students. This study investigated predictors of MSW students’ perceptions of managing personal risk and liability (N=116. Four correlates were identified from the standard regression model that accounts for 43% of the adjusted variance. These predictor variables included: (a concern and worry about lawsuits (Beta=-.458, p=.00, (b understanding the fit between client advocacy and managed care (Beta=.328,p=.00, (c understanding agency documentation requirements (Beta=-.164, p=.05, and (d perceptions of field preparation for documentation (Beta=.162, p=.05. Implications are discussed.

  17. Participation of general practitioners in disease management: experiences from the Netherlands

    Directory of Open Access Journals (Sweden)

    L.M.G. Steuten

    2002-03-01

    Full Text Available Objective: To investigate the extent to which GPs in the Netherlands participate in disease management and how personal opinions, impeding and promoting incentives as well as physician characteristics influence their attitude towards disease management. Methods: The attitude-model of Fishbein and Ajzen was used to describe the attitude of GPs towards disease management and main influencing factors. After interviewing seventeen representatives of the GPs and testing a questionnaire, the final questionnaire was sent to all GPs in the Netherlands (7680 GPs barring those involved in the testing of the questionnaire. Results: At least 10.4% of all Dutch GPs are active in disease management. The main factors predicting a positive attitude towards disease management are the following: GPs' opinion that they are improving quality and efficiency of care when executing disease management, presence of a good quality network between actors involved prior to the start of disease management, working in a health centre, and performing sideline activities besides their daily activities as GPs. The main factors predicting a negative attitude are: GPs' opinion that the investment-time is too high, lack of reimbursement for disease management activities, working in a solo practice, and not performing any sideline activities beside their daily activities as GP. Conclusions: The factors predicting a negative attitude of Dutch GPs towards disease management dominate the factors predicting a positive attitude. The arguments in favour of disease management are matters of belief, for example concerning improvements in the quality of care, while arguments against are more concrete barriers e.g. high workload and financial reimbursement. Placed on the innovation timeline, the 10.4% participation might be taken to represent the start of a trend.

  18. Model risk analysis for risk management and option pricing

    NARCIS (Netherlands)

    Kerkhof, F.L.J.

    2003-01-01

    Due to the growing complexity of products in financial markets, market participants rely more and more on quantitative models for trading and risk management decisions. This introduces a fairly new type of risk, namely, model risk. In the first part of this thesis we investigate the quantitative

  19. [Does clinical risk management require a structured conflict management?].

    Science.gov (United States)

    Neumann, Stefan

    2015-01-01

    A key element of clinical risk management is the analysis of errors causing near misses or patient damage. After analyzing the causes and circumstances, measures for process improvement have to be taken. Process management, human resource development and other established methods are used. If an interpersonal conflict is a contributory factor to the error, there is usually no structured conflict management available which includes selection criteria for various methods of conflict processing. The European University Viadrina in Frankfurt (Oder) has created a process model for introducing a structured conflict management system which is suitable for hospitals and could fill the gap in the methodological spectrum of clinical risk management. There is initial evidence that a structured conflict management reduces staff fluctuation and hidden conflict costs. This article should be understood as an impulse for discussion on to what extent the range of methods of clinical risk management should be complemented by conflict management.

  20. ANALYSIS AND MANAGEMENT RISK IN INTERNATIONAL AFFAIRS

    OpenAIRE

    Lăpăduşi Mihaela Loredana,; Căruntu Constantin

    2009-01-01

    The risk is one of the most controversial issues for all persons involved both in domestic and international world economic affairs. The need to analyze, understand and effectively manage risk is growing, the ultimate aim being to obtain a higher degree of successThe risk means exposure to an uncertain future, the opportunity to face danger or suffering a loss ( "Risk - possibility of loss or injury", Webster's, 1995) or the chance that things go wrong ( "Risk is the change that something wil...

  1. Managing flood risks in the Mekong Delta

    NARCIS (Netherlands)

    Hoang, Long Phi; Biesbroek, Robbert; Tri, Van Pham Dang; Kummu, Matti; Vliet, van Michelle T.H.; Leemans, Rik; Kabat, Pavel; Ludwig, Fulco

    2018-01-01

    Climate change and accelerating socioeconomic developments increasingly challenge flood-risk management in the Vietnamese Mekong River Delta—a typical large, economically dynamic and highly vulnerable delta. This study identifies and addresses the emerging challenges for flood-risk management.

  2. Flood Risk Management Policy in Scotland: Research Questions Past, Present and Future

    Science.gov (United States)

    Wilkinson, Mark; Hastings, Emily; MacDonald, Jannette

    2016-04-01

    Scotland's Centre of Expertise for Waters (CREW) delivers accessible research and expert opinion to support the Scottish Government and its delivery partners in the development and implementation of water policy. It was established in 2011 by the Scottish Government (Rural and Environmental Science and Analytical Services) in recognition of a gap in the provision of short term advice and research to policy (development and implementation). Key policy areas include the Water Framework Directive, Floods Directive, Drinking Water Directive, Habitats Directive and Scotland's Hydro Nation Strategy. CREW is unique in its demand-driven and free service for policy makers and practitioners, managing the engagement between scientists, policy makers and practitioners to work effectively across this interface. The users of CREW are the Scottish Government, Scottish Environment Protection Agency, Scottish Natural Heritage and Scottish Water. CREW has funded around 100 projects relating to water policy since its inception in 2011. Of these, a significant number relate to flood risk management policy. Based on a review of work to date, this poster will give an overview of these projects and a forward look at the challenges that remain. From learning from community led flood risk management to surface water flood forecasting for urban communities, links will be made between sustainable and traditional flood risk management while considering the perceptions of stakeholders to flood risk management. How can we deliver fully integrated flood risk management options? How policy makers, scientists and land managers can better work together will also be explored.

  3. Hog Producers' Risk Management Attitudes and Desire for Additional Risk Management Education

    OpenAIRE

    Patrick, George F.; Peiter, Amy J.; Knight, Thomas O.; Coble, Keith H.; Baquet, Alan E.

    2007-01-01

    Hog producers in Indiana and Nebraska were surveyed about sources of risk, effectiveness of risk management strategies, and prior participation in and desire for additional risk management education. Ownership of hogs by the producer, size of the operation, and age did have significant effects on ratings of both sources of risk and effectiveness of risk management strategies. Probit analysis found age, prior attendance, knowledge and prior use of the tool, level of integration, and concern ab...

  4. The post-infarction nurse practitioner project A prospective study comparing nurse intervention with conventional care in a non-high-risk myocardial infarction population

    NARCIS (Netherlands)

    Broers, C. J. M.; Sinclair, N.; van der Ploeg, T. J.; Jaarsma, T.; van Veldhuisen, D. J.; Umans, V. A. W. M.

    Objectives. To confirm the feasibility of nurse practitioner intervention in non-high-risk patients with recent myocardial infarction (MI). Design. Observational study. Setting. Acute coronary care unit in a teaching hospital. Methods. We performed an open-label feasibility study to identify

  5. Large dams and risk management

    International Nuclear Information System (INIS)

    Cazelais, N.

    2003-01-01

    In July 1996, Quebec's Saguenay region was subjected to intensive rainfall which caused severe floods and uncontrolled release of several reservoirs, resulting in extensive damage to dam structures and reservoirs. The probability of occurrence for that disaster was 1:10,000. Following the disaster, the Quebec government established a dam management body entitled the Commission scientifique et technique sur la gestion des barrages, which pointed out several safety shortcomings of existing dams. Many were either very old or had undergone significant function change without being subsequently re-evaluated. A report by the Commission stated that damage following the floods could have been limited if the design and operating standards of the dams had been more stringent. A Dam Safety Act was adopted by the Quebec National Assembly on May 30, 2000 following recommendations to retain safer structures. The Act demands regular reporting of operating procedures. Seismic activity was noted as being a topic that requires in-depth examination since Quebec's St. Lawrence Valley, particularly the Charlevoix region, is one of Canada's largest seismic zones. The other is on the west coast in British Columbia. Earthquakes in Quebec are less intense than the ones in British Columbia, but they have higher frequency content which exerts a quasi-resonance wave effect which impacts roads, bridges, buildings and hydroelectric generating facilities. Hydro-Quebec is a public utility which owns 563 retaining structures, of which 228 are ranked as large dams that measure more than 15 metres high, 400 metres long and with a reservoir capacity of more than 1 million cubic metres of water. Hydro-Quebec addresses hydrological, seismic, technological and human risks through a dam safety procedure that includes structured plans for choosing best alternatives through staged exercises. Hazard levels are minimized through the adoption of emergency, prevention and alleviation measures. The utility

  6. Practitioner Perceptions of Wildland Fire Management across South Europe and Latin America

    Directory of Open Access Journals (Sweden)

    Domingo M. Molina-Terrén

    2016-08-01

    Full Text Available Wildfire presents a challenge to natural resource managers the world over, and the intentional setting of fires can be used to alleviate some of the challenges associated with wildfire management. Prescribed burning can be used prior to wildfires to reduce fuel loads and promote ecological integrity in fire-adapted systems, while suppression burning can help firefighters control the direction, extent, and intensity of wildfire behavior under extreme conditions. In both cases, the success of intentional fire use depends on training, knowledge, experience, and institutional and social support. The influence of these factors can significantly impact whether fire use is perceived as positive or negative, increasing or decreasing, and whether managers are supportive of its incorporation into their management planning and decision-making. Perceived impediments to fire use are likely to differ based on location, level of training and experience, and even the social context of fire management specific to different job positions in natural resource management. In order to explore how managers and stakeholders across the world perceive fire use, we surveyed over 700 respondents from 12 countries and three continents. This study represents the largest survey of perceptions on managed fire use ever conducted. Perceptions differed across age categories, job positions, and regions. Countries or regions with larger amounts of wildfire area burned tended to be more supportive of fire use for suppression, while countries with less wildfire had less positive perceptions of fire use for either prescribed or suppression burning. Bureaucracy and social perceptions were identified as impediments to using prescribed fire prior to wildfire occurrence, but neither were identified as impediments to fire use during suppression procedures. Across the countries, fire use in suppression was viewed more positively than prescribed fire use prior to wildfire occurrence.

  7. Environmental asset management: Risk management systems

    CSIR Research Space (South Africa)

    Naudé, Brian

    2017-07-01

    Full Text Available bnaude@csir.co.za Charl Petzer Council for Scientific and Industrial Research PO Box 395 Pretoria 0001 South Africa +2712 841 4292 CPetzer1@csir.co.za Copyright © 2017 by B Naudé, C Petzer. Published and used by INCOSE with permission.... Charl Petzer is registered professional engineer with 30 years of programme/project management as well as systems engineering experience in military and other environments. He has been the lead systems engineer, as well as programme manager on several...

  8. RISK MANAGEMENT PROCESSES IN SUPPLY CHAINS

    Directory of Open Access Journals (Sweden)

    Aleksandar Aleksić

    2009-06-01

    Full Text Available One of the keys of successful business last few years is effective dealing with risks in every meaning of that word. At the time when the world economic crisis largely limits business, successful Risk management is the only way of survival for a large number of business systems. This paper will present the processes of risk management in supply chains that are in accordance with the standards ISO 28000 and ISO 31000. By implementing a holistic, enterprise-wide supply chain risk management program, companies also can uphold their commitment to providing strong corporate governance on behalf of stakeholders and increase their market value.

  9. Strategic Risk Management and Corporate Value Creation

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Roggi, Oliviero

    Major corporate failures, periodic recessions, regional debt crises and volatile markets have intensified the focus on corporate risk management as the means to deal better with turbulent business conditions. Hence, the ability to respond effectively to the often dramatic environmental changes...... is considered an important source of competitive advantage. However, surprisingly little research has analyzed if the presumed advantages of effective risk management lead to superior performance or assessed important antecedents of effective risk management capabilities. Here we present a comprehensive study...... of risk management effectiveness and the relationship to corporate performance based on panel data for more than 3,400 firms accounting for over 33,500 annual observations during the turbulent period 1991-2010. Determining effective risk management as the ability to reduce earnings and cash flow...

  10. Risk, innovation and change : design propositions for implementing risk management in organizations

    NARCIS (Netherlands)

    van Staveren, Martinus Theodorus

    2009-01-01

    This Ph.D. research generated unique design propositions for implementing existing risk management methodologies in organizations. The resulting design propositions incorporate a synthesis of risk management, innovation management and change management. True implementation of risk management is

  11. Critical success factors for implementing risk management systems in developing countries

    Directory of Open Access Journals (Sweden)

    M.Reza Hosseini

    2016-03-01

    Full Text Available A review of published studies on risk management in developing countries reveals that critical success factors for implementing risk management has remained an under-researched area of investigation. This paper is aimed at investigating the perceptions of construction professionals concerning the critical success factors (CSFs for implementation of risk management systems (IRMS. Survey data was collected from 87 construction professionals from the Iranian construction industry as a developing country. The results indicate that four factors are regarded as highly critical: ‘support from managers’, ‘inclusion of risk management in construction education and training courses for construction practitioners’, ‘attempting to deliver projects systematically’, and ‘awareness and knowledge of the process for implementing risk management’. Assessing the associations among CSFs also highlighted the crucial role of enhancing the effectiveness of knowledge management practices in construction organisations. Study also revealed that parties involved in projects do not agree on the level of importance of CSFs for implementing risk management in developing countries. This study contributes to practice and research in several ways. For practice, it increases understanding of how closely knowledge management is associated with the implementation of risk management systems in developing countries. For research, the findings would encourage construction practitioners to support effective knowledge management as a precursor to higher levels of risk management implementation on construction projects.

  12. 78 FR 4848 - Social Media: Consumer Compliance Risk Management Guidance

    Science.gov (United States)

    2013-01-23

    ...: Consumer Compliance Risk Management Guidance AGENCY: Federal Financial Institutions Examination Council... Media: Consumer Compliance Risk Management Guidance'' (guidance). Upon completion of the guidance, and... management practices adequately address the consumer compliance and legal risks, as well as related risks...

  13. Risk assessment and management logistics chains

    Directory of Open Access Journals (Sweden)

    Vladimir Vikulov

    2014-03-01

    Full Text Available Background: In the context of economic globalization and increasing complexity of economic relations enterprises need methods and techniques to improve and sustain their position on the global market. Integration processes offer business new opportunities, but at the same time present new challenges for the management, including the key objectives of the risk management. Method: On the basis of analysis tools known from the pertinent literature (Supply Chain Management and Supply Chain Risk Management methods, methods of probability theory, methods of risk management, methods of statistics the authors of this paper proposed their own risk assessment method and the method of management of logistics chains. The proposed tool is a specific hybrid of solutions known from the literature. Results: The presented method has been successfully used within the frames of economic-mathematical model of industrial enterprises. Indicators of supply chain risks, including risks caused by supplier are considered in this paper. Authors formed a method of optimizing the level of supply chain risk in the integration with suppliers and customers. Conclusion: Every organization, which starting the process of integration with supplier and customers, needs to use tools, methodologies and techniques for identification of "weak links" in the supply chain. The proposed method allows to fix risk origin places in various links of the supply chain and to identify "weak links" of a logistic chain that may occur in the future. The method is a useful tool for managing not only risks and risk situations, but also to improve the efficiency of current assets management by providing the ability to optimize the level of risk in the current assets management of the industrial enterprise.

  14. Internal audit risk management in metropolitan municipalities

    Directory of Open Access Journals (Sweden)

    Christo Ackermann

    2016-07-01

    Full Text Available Internal audit functions (IAFs of organisations are regarded as crucial components of the combined assurance model, alongside the audit committee, management and external auditors. The combined assurance model aims at having integrated and aligned assurance in organisations with the overall aim of maximising risk and governance oversight and control efficiencies. In this regard, internal audit plays a crucial role, insofar as it consists of experts in risk, governance and control consultancy who provide assurance to senior management and the audit committee. Audit committees are dependent on internal audit for information and their effectiveness revolves around a strong and well-resourced internal audit function which is able to aid audit committees to meet their oversight responsibilities. There is thus a growing demand for managing risk through the process of risk management and internal audit is in a perfect position to assist with the improvement of such processes. If internal auditors wish to continue being an important aspect of the combined assurance model, they need to address the critical area, amongst others, of risk management as part of their work. If not, it follows that the board, audit committees and other levels of management will remain uninformed on the status of these matters which, in turn, will negatively impact the ability of these stakeholders to discharge their responsibilities. This study therefore focuses on analysing the functioning of IAFs, with specific reference to their risk management mandate. The study followed a mixed method approach to describe internal audits risk management functioning in the big eight metropolitan municipalities in South Africa. The results show that internal audit provide a broad scope of risk management work which assist senior management in the discharge of their responsibilities. However, in the public eye, internal audits risk management functioning is scant

  15. Decisionmaking under risk in invasive species management: risk management theory and applications

    Science.gov (United States)

    Shefali V. Mehta; Robert G. Haight; Frances R. Homans

    2010-01-01

    Invasive species management is closely entwined with the assessment and management of risk that arises from the inherently random nature of the invasion process. The theory and application of risk management for invasive species with an economic perspective is reviewed in this synthesis. Invasive species management can be delineated into three general categories:...

  16. Examining the realities of risk management

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1985-01-01

    Sufficient experience now exists, especially in the nuclear industry, to consider the progress that has been made toward meaningful tools or aids for the control and, hence, management of risk. The considerable activity in the field of probabilistic risk assessment (PRA) suggests a high level of interest and application. It is the purpose of this paper to examine our own experience in this regard and to offer some observations and opinions about current practices in risk management and the requirements for success

  17. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  18. Mapping of Themes Pertaining to Operations Management: a Refined Analysis Based on the Perceptions of Researchers, Lecturers and Practitioners

    Directory of Open Access Journals (Sweden)

    Jurandir Peinado

    2016-01-01

    Full Text Available An article published at Revista de Gestão (REGE, an academic journal by the University of Sao Paulo, in 2013, proposed the mapping of Operations Management themes based on the editorial space provided in major journals and conf erence proceedings in the area. Based on such proposal, the current study conducted a survey to capture the importance assigned to those themes by researchers, lecturers and practitioners and how they categorized the themes into broader groupings. A factor analysis was performed with the data collected by means of the survey and several statistical tests were also carried out in order to assess the strength of the constructs and to confirm the dimensions proposed in the referred mapping of Operations Manage ment themes, allowing for its refinement. The factor analysis resulted in nine factors, seven of which very closely resemble the constructs presented in the previous paper. Thus, the results obtained herein confirm most of the previously obtained mapping, providing a further step in the discussion of the themes that are relevant to the area of Operations Management

  19. The productivity of physician assistants and nurse practitioners and health work force policy in the era of managed health care.

    Science.gov (United States)

    Scheffler, R M; Waitzman, N J; Hillman, J M

    1996-01-01

    Managed care is spreading rapidly in the United States and creating incentives for physician practices to find the most efficient combination of health professionals to deliver care to an enrolled population. Given these trends, it is appropriate to reexamine the roles of physician assistants (PAs) and nurse practitioners (NPs) in the health care workforce. This paper briefly reviews the literature on PA and NP productivity, managed care plans' use of PAs and NPs, and the potential impact of PAs and NPs on the size and composition of the future physician workforce. In general, the literature supports the idea that PAs and NPs could have a major impact on the future health care workforce. Studies show significant opportunities for increased physician substitution and even conservative assumptions about physician task delegation imply a large increase in the number of PAs and NPs that can be effectively deployed. However, the current literature has certain limitations that make it difficult to quantify the future impact of PAs and NPs. Among these limitations is the fact that virtually all formal productivity studies were conducted in fee-for-service settings during the 1970s, rather than managed care settings. In addition, the vast majority of PA and NP productivity studies have viewed PAs and NPs as physician substitutes rather than as members of interdisciplinary health care teams, which may become the dominant health care delivery model over the next 10-20 years.

  20. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  1. Risk Management Practices of Multinational and indigenous ...

    African Journals Online (AJOL)

    Construction projects' high uncertainty rates make them unattractive to non-risk takers. Construction companies are therefore necessarily risk takers, albeit, to varying degrees. This study made an inquiry into the risk management (RM) practices of multinational and indigenous construction companies (MCCs and ICCs, ...

  2. RISKS MANAGEMENT. A PROPENSITY SCORE APPLICATION

    Directory of Open Access Journals (Sweden)

    Constangioara Alexandru

    2008-05-01

    Full Text Available Risk management is relatively unexplored in Romania. Although Romanian specialists dwell on theoretical aspects such as the risks classification and the important distinction between risks and uncertainty the practical relevance of the matter is outside existing studies. Present paper uses a dataset of consumer data to build a propensity scorecard based on relevant quantitative modeling.

  3. Mental Health Practitioners' Perceived Levels of Preparedness, Levels of Confidence and Methods Used in the Assessment of Youth Suicide Risk

    Science.gov (United States)

    Schmidt, Robert C.

    2016-01-01

    Mental health practitioners working within school or community settings may at any time find themselves working with youth presenting with suicidal thoughts or behaviors. Although always well intended, practitioners are making significant clinical decisions that have high potential for influencing a range of outcomes, including very negative…

  4. Does training of general practitioners for intensive treatment of people with screen-detected diabetes have a spillover effect on mortality and cardiovascular morbidity in 'at risk' individuals with normoglycaemia?

    DEFF Research Database (Denmark)

    Simmons, Rebecca Kate; Bruun, Niels H; Witte, Daniel R

    2017-01-01

    the two treatment groups (HR 1.02 [95% CI 0.92, 1.14]). Conclusions/interpretation: Training of general practitioners to provide target-driven intensive management of blood glucose levels and other cardiovascular risk factors showed some evidence of a spillover effect on the risk of CVD over a 9 year......Aims/hypothesis: Within a trial of intensive treatment of people with screen-detected diabetes, we aimed to assess a potential spillover effect of the trial intervention on incident cardiovascular disease (CVD) and all-cause mortality among people who screened positive on a diabetes risk......-detected diabetes (control group); or (2) screening plus training and support in intensive multifactorial treatment of individuals with screen-detected diabetes (intervention group). We identified all individuals who screened positive on a diabetes risk questionnaire in ADDITION-Denmark but were normoglycaemic...

  5. Risks in hospitals. Assessment and Management

    Directory of Open Access Journals (Sweden)

    Bradea Ioana-Alexandra

    2014-12-01

    Full Text Available In a complex world, characterized by a multitude of risks, managers need to manage the risks they encounter, in an efficient way and in the shortest time possible. In the current economic crisis, the concept of hospital risk management, as the process in which is identified, analyzed, reduced, or avoided a risk that may affect the hospital, gained great importance. The Romanian health system, distinguished by: lack of transparency, poor funding, the loss of the valuable medical staff, lack of hospitals in villages and small towns, inability to engage patients due to the old and poor equipment, lack of research and problems in information privacy and cyber-security, requires an appropriate management, enabling risk managers to take decisions in order to avoid the occurrence of risks. Important for the functioning of every hospital is the perception of patients and their degree of satisfaction, regarding the quality of services, which depend largely on the quality of human resources. But what are the human resources weaknesses and risks from the patient point of view? What are the risk indicators which must be monitored to avoid risks? And also, which is the most useful method for measurement and assessment of risk?

  6. Self-reported confidence and skills of general practitioners in management of mental health disorders.

    Science.gov (United States)

    Oakley Browne, Mark; Lee, Adeline; Prabhu, Radha

    2007-10-01

    To identify the predictors of self-reported confidence and skills of GPs in management of patients with mental health problems. Cross-sectional survey, with questionnaire presented to 246 GPs working in 62 practices throughout Gippsland. Rural general practices in Gippsland. One hundred and thirty-four GPs across Gippsland. GPs completed a questionnaire assessing self-perception of knowledge and skills in recognition and management of common mental health problems. Of 134 GPs, 45% reported that they have a specific interest in mental health, and 39% of GPs reported that they had previous mental health training. Only 22% of GPs describe having both an interest and prior training in mental health care. Age and years since graduation are not significantly related to self-reported confidence and skills. The results of this study highlight that self-professed interest and prior training in mental health are associated. Self-professed interest in mental health care predicts confidence and self-perceived skills in recognition, assessment and management of common mental health disorders. Similarly, prior training in mental health care predicts confidence and self-perceived skills in recognition, assessment and management of common mental health problems. Self-professed interest in mental health issues is also associated with hours of participation in continuing medical education related to mental health care. Unfortunately, only a minority described having both interest and prior training in mental health care.

  7. Management of dental implant complications among general dental practitioners in Riyadh, Saudi Arabia

    Directory of Open Access Journals (Sweden)

    Nasser Mansour Assery

    2018-01-01

    Conclusion: Dentists who participated in dental implantology workshops had a higher tendency to answer correctly compared to dentists who were given didactic courses in their undergraduate studies in issues associated with hands-on training. This shows that hands-on training in the undergraduate studies would result in a better understanding of dental implants, its complications, and management.

  8. General Practitioners' Management of Psychostimulant Drug Misuse: Implications for Education and Training

    Science.gov (United States)

    Alkhamis, Ahmed; Matheson, Catriona; Bond, Christine

    2009-01-01

    Aims: To provide baseline data regarding GPs' knowledge, experience, and attitudes toward the management of PsychoStimulant Drug Misuse (PSDM) patients to inform future education and training initiatives. Methods: A structured cross-sectional postal questionnaire was developed following initial content setting interviews, piloted then sent to a…

  9. Risk Management and Risk Psychology in Romanian Sme’s

    Directory of Open Access Journals (Sweden)

    Irina Dănciulescu

    2015-12-01

    Full Text Available Risk is one of the biggest and most fascinating challenges of all times for humanity, because of its presence in all fields. Risk management as a component of modern management, has become a main concern for the modern world and one of the “key mechanisms” of economic development, a complex processn that includes a series of activities meant to alleviate the impact of risk over business and planed or foreseen results. This paper wants to bring to attention the importance of risks and their management in today’s economic crisis. The sector presented is the IT& C, especially software, because Romania had a growth in this area for a few years but beginning the crisis this segment in economy had known a serious decrease. This paper tries to connect risk management and risk psychology to Romanian economy, culture and mentality. The paper presents in short some of risk management characteristics, definitions and few opinions; why in Romania this subject is not treated with the appropriate attention. The paper at hand focuses on the psychology of risk and how it affects the life of individuals and the existence of companies, the importance it should have on day to day basis, especially in Romania

  10. Nuclear power plant risk assembly and decomposition for risk management

    International Nuclear Information System (INIS)

    Iden, D.C.

    1985-01-01

    The state-of-the-art method for analyzing the risk from nuclear power plants is probabilistic risk assessment (PRA). The intermediate results of a PRA are first assembled to quantify the risk from operating a nuclear power plant in the form of (1) core damage (or core melt) frequency, (2) plant damage state frequencies, (3) release category frequencies, and (4) the frequency of exceeding specific levels of offsite consequences. Once the overall PRA results have been quantified, the next step is to decompose those results into the individual contributors to each of the four forms of risk in some rank order. The way in which the PRA model is set up to assemble and decompose the plant risk determines the ease and usefulness of the PRA model as a risk management tool for evaluating perturbations to the PRA model. These perturbations can take the form of technical specification changes, hardware modifications, procedural changes, etc. The matrix formalism developed by Dr. Stan Kaplan for risk assembly and decomposition represents a significant breakthrough in making the PRA model an effective risk management tool. The key to understanding the matrix formalism and making it a useful tool for managing nuclear power plant risk is the structure of the PRA model. PRA risk model structure and decomposition of the risk results are discussed with the Seabrook PRA as an example

  11. Student Discipline Strategies: Practitioner Perspectives

    Science.gov (United States)

    Mancini, Joseph A.

    2017-01-01

    This applied dissertation presented a mixed method design to gain a broader perspective of the perceptions of classroom management practitioners within a particular school district. Many teachers, or practitioners, experience issues with classroom management because of their understanding of strategies they use. Because of the researcher's…

  12. Models for assessing and managing credit risk

    Directory of Open Access Journals (Sweden)

    Neogradi Slađana

    2014-01-01

    Full Text Available This essay deals with the definition of a model for assessing and managing credit risk. Risk is an inseparable component of any average and normal credit transaction. Looking at the different aspects of the identification and classification of risk in the banking industry as well as representation of the key components of modern risk management. In the first part of the essay will analyze how the impact of credit risk on bank and empirical models for determining the financial difficulties in which the company can be found. Bank on the basis of these models can reduce number of approved risk assets. In the second part, we consider models for improving credit risk with emphasis on Basel I, II and III, and the third part, we conclude that the most appropriate model and gives the best effect for measuring credit risk in domestic banks.

  13. [What Surgeons Should Know about Risk Management].

    Science.gov (United States)

    Strametz, R; Tannheimer, M; Rall, M

    2017-02-01

    Background: The fact that medical treatment is associated with errors has long been recognized. Based on the principle of "first do no harm", numerous efforts have since been made to prevent such errors or limit their impact. However, recent statistics show that these measures do not sufficiently prevent grave mistakes with serious consequences. Preventable mistakes such as wrong patient or wrong site surgery still frequently occur in error statistics. Methods: Based on insight from research on human error, in due consideration of recent legislative regulations in Germany, the authors give an overview of the clinical risk management tools needed to identify risks in surgery, analyse their causes, and determine adequate measures to manage those risks depending on their relevance. The use and limitations of critical incident reporting systems (CIRS), safety checklists and crisis resource management (CRM) are highlighted. Also the rationale for IT systems to support the risk management process is addressed. Results/Conclusion: No single tool of risk management can be effective as a standalone instrument, but unfolds its effect only when embedded in a superordinate risk management system, which integrates tailor-made elements to increase patient safety into the workflows of each organisation. Competence in choosing adequate tools, effective IT systems to support the risk management process as well as leadership and commitment to constructive handling of human error are crucial components to establish a safety culture in surgery. Georg Thieme Verlag KG Stuttgart · New York.

  14. The role of records management as a tool to identify risks in the public sector in South Africa

    Directory of Open Access Journals (Sweden)

    Mpho Ngoepe

    2014-06-01

    Objectives: The study utilised the King III report on corporate governance in South Africa as a framework to investigate the role of records management in identifying risks in the public sector, with a view to entrench the synergy between records management and risk management. Method: Quantitative data were collected through questionnaires distributed to records managers, risk managers and auditors in governmental bodies in South Africa. Provisions of the King III report, guided the research objectives. Results: Even though the study established that there is a reciprocal relationship between risk identification and records management, most governmental bodies in South Africa lack records management and risk-mitigating frameworks or strategy. Furthermore, records management did not feature in most governmental bodies’ risk registers. It has been established that most governmental bodies have established risk committees that do not include records management practitioners. In most governmental bodies, risk management resides within internal audit functions. Conclusion: The study concludes by arguing that a strong records management regime can be one of an organisation’s primary tools in identifying risks and implementing proper risk management. Therefore, records management should be integrated with risk management processes for organisations to benefit from the synergy.

  15. Effects of a complex intervention on fall risk in the general practitioner setting: a cluster randomized controlled trial

    Directory of Open Access Journals (Sweden)

    Freiberger E

    2013-08-01

    Full Text Available Ellen Freiberger,1 Wolfgang A Blank,2 Johannes Salb,1 Barbara Geilhof,3 Christian Hentschke,1 Peter Landendoerfer,2 Martin Halle,3 Monika Siegrist31Institute of Sport Science and Sport Universität Erlangen-Nürnberg, Nuremberg, Germany; 2Institute of General Practice, Technische Universität München, Munich, Germany; 3Department of Prevention, Rehabilitation and Sports Medicine, Technische Universität München, Munich, GermanyPurpose: To study the feasibility of first, reaching functionally declined, but still independent older persons at risk of falls through their general practitioner (GP and second, to reduce their physiological and psychological fall risk factors with a complex exercise intervention. We investigated the effects of a 16-week exercise intervention on physiological (function, strength, and balance and psychological (fear of falling outcomes in community-dwelling older persons in comparison with usual care. In addition, we obtained data on adherence of the participants to the exercise program.Methods: Tests on physical and psychological fall risk were conducted at study inclusion, and after the 16-week intervention period in the GP office setting. The 16-week intervention included progressive and challenging balance, gait, and strength exercise as well as changes to behavioral aspects. To account for the hierarchical structure in the chosen study design, with patients nested in GPs and measurements nested in patients, a three-level linear mixed effects model was determined for analysis.Results: In total, 33 GPs recruited 378 participants (75.4% females. The mean age of the participants was 78.1 years (standard deviation 5.9 years. Patients in the intervention group showed an improvement in the Timed-Up-and-Go-test (TUG that was 1.5 seconds greater than that showed by the control group, equivalent to a small to moderate effect. For balance, a relative improvement of 0.8 seconds was accomplished, and anxiety about falls was

  16. Quality Risk Management of Compliant Excipients

    Directory of Open Access Journals (Sweden)

    Brian Carlin

    2012-12-01

    Full Text Available Raw material compliance and GMP do not eliminate variability. Quality by Design should minimize the risk that raw material variability will adversely affect the finished product Critical Quality Attributes. The sources of technological risk from excipients are reviewed and approaches to excipient risk management are discussed. Supplier involvement throughout the product life-cycle is recommended to minimize excipient-related risk.

  17. FINANCIAL RISK MANAGEMENT IN TRADE BANKS

    Directory of Open Access Journals (Sweden)

    Ms. Tamara Ye. Kononenko

    2016-09-01

    Full Text Available The paper clarifies the concepts of «risk», «financial risk» in banking business, and considers the main problems of financial risk management in trade banks while financing borrowers. The authors single out the most relevant problems, and conduct the analysis of overdue payment in case of OJSC “Sberbank of Russia”. The authors also offer a number of measures to minimize financial risks in trade bank activities in modern conditions.

  18. Food and Drug Administration upscheduling of hydrocodone and the effects on nurse practitioner pain management practices.

    Science.gov (United States)

    Mack, Rachel

    2018-06-01

    In 2013, the Advisory Committee of the Food and Drug Administration determined hydrocodone combination medications (HCMs) needed tighter regulation due to high abuse potential; they recommended upscheduling HCMs from Schedule III to II. The purpose of this study was to examine the effect of upscheduling of HCMs on pain management practices of advanced practiced registered nurses (APRNs) in Oklahoma. In this qualitative study, 25 participants described their primary care experiences after the upscheduling. A thematic analysis was used to understand the effects on APRN pain management practices. The upscheduling of HCMs has greatly affected the pain management practices of APRNs in a state where Schedule II narcotic prescribing is forbidden. Findings will assist APRNs with improving patient access to care, implementing practice regulations, and exploring options for alternative pain therapies in primary care. Upscheduling of HCMs has had a severe impact on APRNs, affecting their prescribing practices and leading to increased referrals. They noted limited treatment options, increased health care costs, and decreased access to care. The APRNs understand the problem of prescription opioid abuse, diversion, and misuse. A consensus model could standardize the regulatory process for APRNs, increase interstate mobility for practice, and increase access to APRN care nationwide.

  19. Sustainable Risk Management in the Banking Sector

    Directory of Open Access Journals (Sweden)

    Županović Ivo

    2014-01-01

    Full Text Available The globalization of financial markets and negative consequences of the financial crisis resulted in negative connotations in the operation of many financial institutions, businesses and citizens and imposed the need to implement appropriate risk management measures in the banking sector. Evolution of the financial sector makes a lot of news in the field of risk management and particularly the modelling of market, credit and operational risk. The main methodology for risk management is the value-at-risk, which is used in practice with other techniques such as the capital- at-risk method in order to minimize business risks and achieve optimal results in the banking and, generally, financial operations. Accordingly, at all levels of governance in the banking sector, there are prudential policies in place governing the management of all types of financial and operational risks. Based on the abovementioned, the focus of the examination was on the above postulate, and prompt recognition, control and proper management of banking risks.

  20. The Strategic-Renovation Banks’ Risks Management

    Directory of Open Access Journals (Sweden)

    Yeremeychuk Raisa A.

    2017-04-01

    Full Text Available The article is aimed at developing approaches to implementation of the strategic-renovation risk management. Essence of risk theories was researched, the concept of «risk» in the bank’s management system were analyzed. On the basis of a theoretical generalization of scientific literature and the carried out analysis of existing risk management strategies to ensure the security of banking business, the strategy of renovation management has been selected. Because bank risks are part of the economic risk system, they are complex in their nature. However, given the importance of bank risks, the interpretation of their essence is still a debating matter. In a certain number of cases, their essence is replaced by the cause of occurrence, that is, all the different circumstances, factors that lead to the losses. So today, banks are considering risks, in particular, not only as a source of possible losses, but also as an opportunity to generate additional profits. An algorithm for taking a strategic-renovation decision on the banks’ risks management system has been proposed.

  1. Intentional risk management through complex networks analysis

    CERN Document Server

    Chapela, Victor; Moral, Santiago; Romance, Miguel

    2015-01-01

    This book combines game theory and complex networks to examine intentional technological risk through modeling. As information security risks are in constant evolution,  the methodologies and tools to manage them must evolve to an ever-changing environment. A formal global methodology is explained  in this book, which is able to analyze risks in cyber security based on complex network models and ideas extracted from the Nash equilibrium. A risk management methodology for IT critical infrastructures is introduced which provides guidance and analysis on decision making models and real situations. This model manages the risk of succumbing to a digital attack and assesses an attack from the following three variables: income obtained, expense needed to carry out an attack, and the potential consequences for an attack. Graduate students and researchers interested in cyber security, complex network applications and intentional risk will find this book useful as it is filled with a number of models, methodologies a...

  2. Risk management; Maitriser le risque

    Energy Technology Data Exchange (ETDEWEB)

    Magne, L

    1999-07-01

    There is always a risk of an accident occurring at a nuclear power plant, however small. The problem lies in estimating the probability of it occurring. The method of probabilistic safety assessment provides this estimate, and by identifying the sources of potential risk, makes it possible to prevent them from occurring. It is not, however, a substitute for other decision-making processes. (author)

  3. Managers facing the climatic risks

    International Nuclear Information System (INIS)

    2003-01-01

    This colloquium aimed to analyze the relations between the climatic changes and extreme meteorological events and on the associated risks. It provides information and knowledge on the state of the art concerning the today scientific knowledge, the prevention measures and the adaptation facing the risks and the difficult estimation of the climatic damages costs. (A.L.B.)

  4. Risk management and safety culture

    International Nuclear Information System (INIS)

    Takano, K.

    2007-01-01

    Paper informs on the efforts to elaborate a feedback system for risk comprehensive evaluation and a system to improve structure safety foreseeing the possibility to control the latent risk, ensuring the qualitative evaluation of the safety level and improvement of safety culture in various branches of industry, first and foremost, in the electricity producing sector including the nuclear power industry [ru

  5. Risk management in Swedish hedge funds

    OpenAIRE

    Fri, Samuel; Nilsson, Joakim

    2011-01-01

    Background: Risk management has always been a complex topic, especially when it comes to hedge funds. Since hedge funds are able to utilize many kinds of financial instruments it is difficult to find a risk management strategy that goes well with them. Not much research regarding the Swedish hedge fund industry and its risk management has been done; hence we find it an interesting topic to focus this thesis on. Purpose: The purpose of this thesis is to increase the knowledge of how Swedish he...

  6. Evaluating risk management strategies in resource planning

    International Nuclear Information System (INIS)

    Andrews, C.J.

    1995-01-01

    This paper discusses the evaluation of risk management strategies as a part of integrated resource planning. Value- and scope-related uncertainties can be addressed during the process of planning, but uncertainties in the operating environment require technical analysis within planning models. Flexibility and robustness are two key classes of strategies for managing the risk posed by these uncertainties. This paper reviews standard capacity expansion planning models and shows that they are poorly equipped to compare risk management strategies. Those that acknowledge uncertainty are better at evaluating robustness than flexibility, which implies a bias against flexible options. Techniques are available to overcome this bias

  7. Physicians' characteristics associated with exploring suicide risk among patients with depression: a French panel survey of general practitioners.

    Science.gov (United States)

    Bocquier, Aurélie; Pambrun, Elodie; Dumesnil, Hélène; Villani, Patrick; Verdoux, Hélène; Verger, Pierre

    2013-01-01

    General practitioners (GPs) have a key role to play in suicide prevention, but the rates at which they question patients with depression about suicidal thoughts and plans are rather low. Little is known about GPs' characteristics associated with such inquiries. Our objectives were to describe GPs' attitudes, perceived barriers, and self-reported practices in this questioning of these patients and to analyze factors associated with these practices. This cross-sectional survey was conducted among participants in a panel of randomly selected French GPs (1249/1431 participated: 87.3%). GPs were interviewed with a standardized questionnaire covering their professional and personal characteristics, attitudes, and practices in exploring the suicide risk of their patients with depression. We built a suicide inquiry score by summing the responses to 5 items and used a multiple linear regression analysis to explore the characteristics associated with this score. Most GPs reported inquiring about the presence of suicidal ideation often or very often; less than 30% reported that they frequently explored signs of a specific suicide plan. The mean suicide inquiry score was 12.4 (SD, 2.9; range, 5-20). False ideas, such as thinking that patients who report suicidal ideas do not often commit suicide, were frequent (42.3%). Previous continuing medical education on suicide, participation in a formal mental health network, and patients who committed suicide in the past 5 years were associated with a higher score. Reluctance to question patients about suicide and perception of insufficient skill were associated with a lower score. This study showed great variability in French GPs' practices in exploring suicide risk in patients with depression. Interventions aiming at improving GPs' initial training and continuing medical education in suicide and/or depression, and their collaboration with mental health specialists should be developed, and their impacts assessed.

  8. Physicians' characteristics associated with exploring suicide risk among patients with depression: a French panel survey of general practitioners.

    Directory of Open Access Journals (Sweden)

    Aurélie Bocquier

    Full Text Available BACKGROUND: General practitioners (GPs have a key role to play in suicide prevention, but the rates at which they question patients with depression about suicidal thoughts and plans are rather low. Little is known about GPs' characteristics associated with such inquiries. Our objectives were to describe GPs' attitudes, perceived barriers, and self-reported practices in this questioning of these patients and to analyze factors associated with these practices. METHODOLOGY: This cross-sectional survey was conducted among participants in a panel of randomly selected French GPs (1249/1431 participated: 87.3%. GPs were interviewed with a standardized questionnaire covering their professional and personal characteristics, attitudes, and practices in exploring the suicide risk of their patients with depression. We built a suicide inquiry score by summing the responses to 5 items and used a multiple linear regression analysis to explore the characteristics associated with this score. PRINCIPAL FINDINGS: Most GPs reported inquiring about the presence of suicidal ideation often or very often; less than 30% reported that they frequently explored signs of a specific suicide plan. The mean suicide inquiry score was 12.4 (SD, 2.9; range, 5-20. False ideas, such as thinking that patients who report suicidal ideas do not often commit suicide, were frequent (42.3%. Previous continuing medical education on suicide, participation in a formal mental health network, and patients who committed suicide in the past 5 years were associated with a higher score. Reluctance to question patients about suicide and perception of insufficient skill were associated with a lower score. CONCLUSIONS/SIGNIFICANCE: This study showed great variability in French GPs' practices in exploring suicide risk in patients with depression. Interventions aiming at improving GPs' initial training and continuing medical education in suicide and/or depression, and their collaboration with mental

  9. A survey of the assessment and management of gout in general practitioners and medical officers within the Illawarra Network, Australia.

    Science.gov (United States)

    Terrill, Matthew; Riordan, John

    2017-08-01

    To review the assessment and management of gout by general practitioners (GPs) and medical officers (MOs) within the Illawarra Network, Australia. A survey was sent to GPs and MOs within the Illawarra Network. Of 110 GPs, 45 responded. Of 129 MOs, 42 responded. The overall response was 32.6%. On analysis, 65.1% felt their knowledge of gout to be adequate and 61.6% thought they had been educated well. In acute assessment, 59.1% of GPs responded that the diagnosis of gout best be confirmed with a joint aspiration and 36.4% clinical suspicion. Differing, 85.7% of MOs chose a joint aspiration. In acute management, if colchicine were used, 59.1% of GPs would give 1 mg followed by 0.5 mg an hour later, then 0.5 mg twice daily, compared to 9.5% of MOs, while 20.5% of GPs would use 1 mg twice daily. Chronic management was answered poorly. After an acute attack, urate lowering therapy (ULT) would be started 14 days after by 47.7% of GPs, compared to 69.0% of MOs. GPs were more likely to start ULT within 7 days (52.3% vs. 31.0%). With dosing of ULT, 45.3% would treat to target, while 46.5% would dose to the creatinine clearance. Prophylactic therapy with ULT would be started by 81.8%, although only 17.4% would continue it for 3-6 months. There is poor adherence to recommended practice for dosing of colchicine in acute gout. Also in the management of chronic gout, in particular, the timing of starting ULT and the use of prophylaxis when initiating ULT. © 2016 Asia Pacific League of Associations for Rheumatology and John Wiley & Sons Australia, Ltd.

  10. Risk management and analysis: risk assessment (qualitative and quantitative)

    OpenAIRE

    Valentin Mazareanu

    2007-01-01

    We use to define risk as the possibility of suffering a loss. Starting this, risk management is defined as a business process whose purpose is to ensure that the organization is protected against risks and their effects. In order to prioritize, to develop a response plan and after that to monitor the identified risks we need to asses them. But at this point a question is born: should I choose a qualitative approach or a quantitative one? This paper will make a short overview over the risk eva...

  11. Beyond the physical examination: the nurse practitioner's role in adolescent risk reduction and resiliency building in a school-based health center.

    Science.gov (United States)

    Davis, Teresa K

    2005-12-01

    School-based health centers in high schools provide a unique setting in which to deliver risk-reduction and resilience-building services to adolescents. The traditional health care system operating in the United States focuses on the treatment of illness and disease rather than on preventing problems originating from health risk behaviors. Nurse practitioners can promote healthy behavior in adolescents through linkages to parents, schools, and community organizations; by conducting individual risk assessments; and by providing health education and access to creative health programs that build resilience and promote protective factors. With a focus on wellness, nurse practitioners as advanced practice nurses and specialists in disease prevention and health promotion can establish students' health priorities in the context of the primary health care they deliver on a daily basis.

  12. Risk perception as a driver for risk management policies

    Science.gov (United States)

    Carmona, María; Mañez, María

    2016-04-01

    Risk is generally defined as the "combination of the probability of the occurrence of an event and its negative consequences" ( UNISDR, 2009). However, the perception of a risk differs among cultures regarding different features such as the context,causes, benefits or damage. Risk perception is the subjective valuation of the probability of an event happening and how concerned individuals or groups are with the consequences (Sjöberg, 2004). Our study is based on an existing framework for risk perception (Rehn and Rohrmann, 2000). We analyse the characteristics of the risk perception regarding extreme events (e.g.droughts) and how the perception of the group drives the action to manage the risk. We do this to achieve an overview of the conditions that let stakeholders join each other to improve risk management especially when governments are not reacting properly. For our research, attention is paid on risk perception of Multi-Sector Partnerships not taking into account the individual level of risk perception. We focus on those factors that make risk management effective and increase resilience. Multi-Sector Partnerships, considered as significant governance structures for risk management, might contribute to reduce vulnerability in prone areas to natural hazards and disasters. The Multi-Sector Partnerships used for our research are existing partnerships identified in the cases studies of the European project ENHANCE. We implement a survey to analyse the perception of risk in the case studies. That survey is based on the Cultural Theory (Douglas and Wildavsky, 1982)and the Protection Motivation Theory (Rogers, 1975). We analyse the results using the Qualitative-Comparative Analysis proposed by Ragin in 1987. The results show the main characteristics of a risk culture that are beneficial to manage a risk. Those characteristics are shaped by the perception of risk of the people involved in the partnership, which in turn shapes their risk management. Nevertheless, we

  13. Practical Risk Management for the CIO

    CERN Document Server

    Scherling, Mark

    2007-01-01

    The growing complexity of today's interconnected systems has not only increased the need for improved information security, but also helped to move information from the IT backroom to the executive boardroom as a strategic asset. And, just like the tip of an iceberg is all you see until you run into it, the risks to your information are mostly invisible until disaster strikes. Detailing procedures that will help your team perform better risk assessments and aggregate results into more meaningful metrics, Practical Risk Management for the CIO approaches information risk management through impro

  14. Practical Methods for Information Security Risk Management

    Directory of Open Access Journals (Sweden)

    Cristian AMANCEI

    2011-01-01

    Full Text Available The purpose of this paper is to present some directions to perform the risk man-agement for information security. The article follows to practical methods through question-naire that asses the internal control, and through evaluation based on existing controls as part of vulnerability assessment. The methods presented contains all the key elements that concurs in risk management, through the elements proposed for evaluation questionnaire, list of threats, resource classification and evaluation, correlation between risks and controls and residual risk computation.

  15. Managing risk in statistics - "Relative risk" | Durrheim | South African ...

    African Journals Online (AJOL)

    South African Family Practice. Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue · Archives · Journal Home > Vol 45, No 8 (2003) >. Log in or Register to get access to full text downloads. Username, Password, Remember me, or Register. Managing risk in statistics - "Relative risk". DN Durrheim ...

  16. The application of holistic risk management in the banking industry

    Directory of Open Access Journals (Sweden)

    J. Chibayambuya

    2007-12-01

    Full Text Available Purpose: The application of holistic risk management is fast becoming a standard measure of good governance in the business arena. What role can holistic risk management play in the management of risk in the financial services industry? The aim of this paper is to propose a holistic risk management framework for the management of risk. Design/Methodology/Approach: A comprehensive framework that covers the holistic view risk management is proposed/developed out of an extensive literature review. Findings: Given the deliberations of various frameworks, a holistic risk management is proposed. The proposed framework ensures that all components of risk management are taken into account when strategizing for risk management in general and holistic risk management in particular; thereby improving the management of risk in the banking industry. Implications: The article proposes a holistic approach to risk management which takes into account all the facets of risk management, e.g. analyzing, planning, strategy, communication, implementation, motivation, systems review and plan modification. This holistic approach, when implemented in the banking industry, can have a significant impact on the improved management of risk. Originality/Value: The new proposed holistic risk management framework offers a fresh perspective of strategizing for risk management in terms of risk analysis, risk planning, risk strategy, risk communication, risk implementation, risk motivation, risk review and risk plan modification.

  17. RISK MANAGEMENT IN THE ELECTRONIC BUSINESS

    Directory of Open Access Journals (Sweden)

    Georgeta Soava

    2016-12-01

    Full Text Available Risk should not be understood as a destructive phenomenon, but bear in mind that managers who know how to use it can lead to real opportunities. Manager must first recognize the existence of risk, namely to identify and then use specific methods to avoid or reduce the risk. The purpose of this paper is to enter the world, at all simple, of risk management, relatively easy concept to understand but not so easy to put into practice. Of course, the approach relates primarily at the risks inherent of the business in digital environments, but they not represent only a particular case of the risks they are exposed, in general, the companies. In the paper we put in evidence the significance in general business, risks in e-business, then we added a description of the types of security risks, an exemplification of these and a series of test scenarios, and finally to make a analysis of operational solutions of risk management

  18. Knowledge and Preparedness of Dental Practitioners on Management of Medical Emergencies in Jazan Province

    Directory of Open Access Journals (Sweden)

    Ghassan M. Al-Irany

    2018-02-01

    Full Text Available Medical emergencies are one of the most stressful situations the staff in a dental practice might encounter. The duty of care toward the attending patients obligates suitable preparedness to provide the necessary care if such emergencies ensue. Unfortunately, we found that 22% of the investigated dental clinics had no emergency kit available. Only 38% of the interviewed dentists felt confident to perform CPR, and 18% had no confidence to manage any medical emergency. An MCQ test of 20 questions examining the dentists’ knowledge in medical emergencies was distributed, and the level of knowledge was found to be suboptimal. The average score of the interviewed dentists was 10.87 out of 20. Experience and specialty training had a negligible effect on the level of knowledge.

  19. Contingency Management for Patients with Cooccurring Disorders: Evaluation of a Case Study and Recommendations for Practitioners

    Directory of Open Access Journals (Sweden)

    Claire E. Adams

    2012-01-01

    Full Text Available Research indicates that contingency management (CM has potential to improve a number of outcomes (e.g. substance use, treatment attendance, quality of life among individuals with substance use and cooccurring disorders. However, multiple factors must be considered on a case-by-case basis in order to promote optimal treatment effects. The present study describes an individualized CM protocol for a US Veteran with substance dependence and cooccurring severe mental illness. CM targeted attendance at outpatient appointments and appropriate use of hospital resources. Effects of CM were assessed by comparing the 3-month baseline and CM periods. The CM intervention marginally reduced unnecessary hospital admissions, resulting in cost savings to the medical center of over $5,000 in three months for this individual. However, CM did not affect outpatient attendance. Several complications arose, highlighting challenges in using CM in populations with substance use and cooccurring disorders. Practical suggestions are offered for maximizing the effects of CM.

  20. Risk Management Considerations for Interoperable Acquisition

    National Research Council Canada - National Science Library

    Meyers, B. C

    2006-01-01

    .... The state of risk management practice -- the specification of standards and the methodologies to implement them -- is addressed and examined with respect to the needs of system-of-systems interoperability...

  1. Diabetic ketoacidosis: risk factors, mechanisms and management ...

    African Journals Online (AJOL)

    Diabetic ketoacidosis: risk factors, mechanisms and management strategies in sub-Saharan Africa: a review. ... ketoacidosis is the most common hyperglycaemic emergency in patients with diabetes mellitus, especially type 1 diabetes.

  2. Managing flood risk through collaborative governance | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2013-05-21

    May 21, 2013 ... Managing flood risk through collaborative governance ... This article profiles a project supported by IDRC's Climate Change and Water program, ... and in the intensity of extreme weather events are resulting in the erosion of lo.

  3. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  4. Managing risks in the project pipeline.

    Science.gov (United States)

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  5. Small Business and the Risk Management Program

    Science.gov (United States)

    This factsheet helps small businesses comply with the regulation requiring companies that use regulated substances, hazardous chemical such as ammonia and chlorine, to develop a risk management plan, to help prevent accidental toxic or flammable releases.

  6. Roadway related tort liability and risk management.

    Science.gov (United States)

    2010-06-01

    This workbook provide government employees background information related to tort liability and risk management. Past experience with lawsuits against government entities are summarized. The reasons for the lawsuits and results are analyzed. The obje...

  7. From CSR to Social Risk Management

    DEFF Research Database (Denmark)

    Taarup Esbensen, Jacob

    2014-01-01

    When it comes to social risks multinational companies (MNC) within Mining are one of the most exposed businesses one can imagine. This paper examines how social risk management is practiced through the case of Teghout copper-molybdenum mine in North- Eastern Armenia, supplemented with evidence from...... other mining MNCs in the country, onsite fieldwork, interviews with key stakeholders, and public available information. This evidence suggest that a standards based social risk management strategy is adopted and that this strategy is based on international Corporate Social Responsibility (CSR) standards...... engagement management systems that is promoted through the standard. The implemented social risk management systems are ineffective because they makes the MNC unable to recognise the value of weak ties and fail to build legitimacy and trust with some of the key stakeholders resulting in the creation of more...

  8. Wildfire Risk Management: Challenges and Opportunities

    Science.gov (United States)

    Thompson, M.; Calkin, D. E.; Hand, M. S.; Kreitler, J.

    2014-12-01

    In this presentation we address federal wildfire risk management largely through the lens of economics, targeting questions related to costs, effectiveness, efficiency, and tradeoffs. Beyond risks to resources and assets such as wildlife habitat, watersheds, and homes, wildfires present financial risk and budgetary instability for federal wildfire management agencies due to highly variable annual suppression costs. Despite its variability, the costs of wildfire management have continued to escalate and account for an ever-growing share of overall agency budgets, compromising abilities to attain other objectives related to forest health, recreation, timber management, etc. Trends associated with a changing climate and human expansion into fire-prone areas could lead to additional suppression costs in the future, only further highlighting the need for an ability to evaluate economic tradeoffs in investments across the wildfire management spectrum. Critically, these economic analyses need to accurately capture the complex spatial and stochastic aspects of wildfire, the inherent uncertainty associated with monetizing environmental impacts of wildfire, the costs and effectiveness of alternative management policies, and linkages between pre-fire investments and active incident management. Investing in hazardous fuels reduction and forest restoration in particular is a major policy lever for pre-fire risk mitigation, and will be a primary focus of our presentation. Evaluating alternative fuel management and suppression policies could provide opportunities for significant efficiency improvements in the development of risk-informed management fire management strategies. Better understanding tradeoffs of fire impacts and costs can help inform policy questions such as how much of the landscape to treat and how to balance investments in treating new areas versus maintaining previous investments. We will summarize current data needs, knowledge gaps, and other factors

  9. Decision support for utility environmental risk management

    International Nuclear Information System (INIS)

    Balson, W.E.; Wilson, D.S.

    1991-01-01

    This paper reviews a number of decision support methods developed and applied by Decision Focus Incorporated to help utility personnel manage current environmental problems. This work has been performed for the Environmental Risk Analysis Program of EPRI's Environment Division, and also for a number of electric utilities across the country. These are two distinct types of decision support software tools that have been created: economic risk management and environmental risk analysis. These types differ primarily in the identification of who will make a decision. Economic risk management tools are directed primarily at decisions made by electric utilities. Environmental risk analysis tools are directed primarily at decisions made by legislative or regulatory agencies, about which a utility may wish to comment

  10. Radiation risk management at DOE accelerator facilities

    International Nuclear Information System (INIS)

    Dyck, O.B. van.

    1997-01-01

    The DOE accelerator contractors have been discussing among themselves and with the Department how to improve radiation safety risk management. This activity-how to assure prevention of unplanned high exposures-is separate from normal exposure management, which historically has been quite successful. The ad-hoc Committee on the Accelerator Safety Order and Guidance [CASOG], formed by the Accelerator Section of the HPS, has proposed a risk- based approach, which will be discussed. Concepts involved are risk quantification and comparison (including with non-radiation risk), passive and active (reacting) protection systems, and probabilistic analysis. Different models of risk management will be presented, and the changing regulatory environment will also be discussed

  11. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  12. Plant risk status information management system

    International Nuclear Information System (INIS)

    Campbell, D.J.; Ellison, B.C.; Glynn, J.C.; Flanagan, G.F.

    1985-01-01

    The Plant Risk Status Information Management System (PRISIMS) is a PC program that presents information about a nuclear power plant's design, its operation, its technical specifications, and the results of the plant's probabilistic risk assessment (PRA) in a logically and easily accessible format. PRISIMS provides its user with unique information for integrating safety concerns into day-to-day operational decisions and/or long-range management planning

  13. Delegated Portfolio Management and Risk Taking Behavior

    OpenAIRE

    José Luiz Barros Fernandes; Juan Ignacio Peña; Benjamin Miranda Tabak

    2009-01-01

    Standard models of moral hazard predict a negative relationship between risk and incentives; however empirical studies on mutual funds present mixed results. In this paper, we propose a behavioral principal-agent model in the context of professional managers, focusing on active and passive investment strategies. Using this general framework, we evaluate how incentives affect the risk taking behavior of managers, using the standard moral hazard model as a special case; and solve the previous c...

  14. Fundamentals of risk management understanding, evaluating and implementing effective risk management

    CERN Document Server

    Hopkin, Paul

    2012-01-01

    Now more than ever, organizations must plan, response and recognize all forms of risks that they face. "Fundamentals of Risk Management", now in its second edition, provides a comprehensive introduction to the subject of commercial and business risk for anyone studying for a career in risk as well as a broad range of risk professionals. It examines the key components of risk management and its application with examples to demonstrate its benefit to organisations in the public and private sector. The second edition has been completely updated to take into account the greater influence of ISO 3100, the emergence of Governance Risk and Compliance (GRC) and the wide use of the bowtie method to illustrate risk management. In addition, there is now a chapter on the skills and competencies required by an effective risk manager.

  15. Risk management - unappreciated instrument of supply chain management strategy

    OpenAIRE

    Wojciech Machowiak

    2012-01-01

    Background: Unlike Enterprise Risk Management, which is certainly quite well rooted in business practice, Supply Chain Risk Management (SCRM) still continues to be dynamically developing subject of academic research, whereas its practical applications are rather scarce. Material and methods: On the basis of broad review of the current state of the art in world literature, significant  relevancies to the core processes and enterprise strategy are discussed.   Results: ...

  16. Radiographers' and radiology practitioners' opinion, experience and practice of benefit-risk communication and consent in paediatric imaging

    International Nuclear Information System (INIS)

    Portelli, J.L.; McNulty, J.P.; Bezzina, P.; Rainford, L.

    2016-01-01

    Objectives: To investigate radiographers' and radiology practitioners' opinion, experience and practice of radiation benefit-risk communication and consent for paediatric imaging examinations. Methods: A cross-sectional survey was conducted amongst radiographers and radiology practitioners working at a primary paediatric referral centre in Malta, so as to acquire information about their interactions with paediatric patients and/or their parents, particularly their opinion and practice of communicating benefit-risk information and seeking consent for imaging examinations. Results: The return of 112 questionnaires provided a response rate of 66.7%. Findings revealed varied practice relating to the provision of benefit-risk information, whereby details concerning examination benefits and potential risks are not always conveyed. For 89% of participants, parental consent was sought for paediatric imaging examinations in their current practice. Only 36.7% of participants indicated that they were highly confident in their ability to communicate benefit-risk information. The study findings also revealed that parents can truly be worried about the associated radiation exposure, with some even refusing an imaging examination as a result of such concerns. Conclusions: The practice of communicating benefit-risk information to paediatric patients and/or their parents is varied. A possible gap in benefit-risk communication education and/or training was identified, which may impact radiographers' and radiology practitioners' confidence in conveying such information. Education/training activities for radiographers and radiology practitioners are therefore necessary to foster improved benefit-risk dialogues and help provide reassurance to parents/guardians about the benefits of appropriately indicated paediatric imaging examinations. - Highlights: • The practice of communicating radiation benefit-risk information to parents of paediatric patients is varied.

  17. Randomized controlled trial on cardiovascular risk management by practice nurses supported by self-monitoring in primary care

    NARCIS (Netherlands)

    Tiessen, Ans H.; Smit, Andries J.; Broer, Jan; Groenier, Klaas H.; van der Meer, Klaas

    2012-01-01

    Background: Treatment goals for cardiovascular risk management are generally not achieved. Specialized practice nurses are increasingly facilitating the work of general practitioners and self-monitoring devices have been developed as counseling aid. The aim of this study was to compare standard

  18. Meteorological risks as drivers of innovation for agroecosystem management

    Science.gov (United States)

    Gobin, Anne; Van de Vyver, Hans; Zamani, Sepideh; Curnel, Yannick; Planchon, Viviane; Verspecht, Ann; Van Huylenbroeck, Guido

    2015-04-01

    Devastating weather-related events recorded in recent years have captured the interest of the general public in Belgium. The MERINOVA project research hypothesis is that meteorological risks act as drivers of environmental innovation in agro-ecosystem management which is being tested using a "chain of risk" approach. The major objectives are to (1) assess the probability of extreme meteorological events by means of probability density functions; (2) analyse the extreme events impact of on agro-ecosystems using process-based bio-physical modelling methods; (3) identify the most vulnerable agro-ecosystems using fuzzy multi-criteria and spatial analysis; (4) uncover innovative risk management and adaptation options using actor-network theory and economic modelling; and, (5) communicate to research, policy and practitioner communities using web-based techniques. Generalized Extreme Value (GEV) theory was used to model annual rainfall maxima based on location-, scale- and shape-parameters that determine the centre of the distribution, the deviation of the location-parameter and the upper tail decay, respectively. Likewise the distributions of consecutive rainy days, rainfall deficits and extreme 24-hour rainfall were modelled. Spatial interpolation of GEV-derived return levels resulted in maps of extreme precipitation, precipitation deficits and wet periods. The degree of temporal overlap between extreme weather conditions and sensitive periods in the agro-ecosystem was determined using a bio-physically based modelling framework that couples phenological models, a soil water balance, crop growth and environmental models. 20-year return values were derived for frost, heat stress, drought, waterlogging and field access during different sensitive stages for different arable crops. Extreme yield values were detected from detrended long term arable yields and relationships were found with soil moisture conditions, heat stress or other meteorological variables during the

  19. Management of interest rate risk

    Directory of Open Access Journals (Sweden)

    Šabović Šerif

    2014-01-01

    Full Text Available Interest rate risk is one of the biggest and most dangerous risks that a bank is exposed to. When a change of interest rates occurs, the incomes of a bank based on credits and securities endure significant changes. Banks resources also endure some changes. The change of interest rates changes the value of the assets and liabilities of the bank and it's net and investment worth . The change of interest rates also affects bank's balance sheet, income sheet statement and bank's share capital.

  20. Risk management and oil trading contracts

    International Nuclear Information System (INIS)

    Sas, B.

    1992-01-01

    The oil market provides an excellent case study for an analysis of the commodity trading risks and the development of contractual instruments and market structures to meet these risks. The paper identifies the main risks, namely performance, credit/payment, price, regulatory, fiscal, and ''trading'' risk. A conceptual framework provides the basis to trace the evolution of the risk management instruments from relational (e.g. long-term), through ''transactional'' (e.g. spot and forwards) to ''institutional'' (e.g. futures and options) and finally ''pricing'' (e.g. swaps and trigger pricing) contracts. (author)

  1. The NASA Continuous Risk Management Process

    Science.gov (United States)

    Pokorny, Frank M.

    2004-01-01

    As an intern this summer in the GRC Risk Management Office, I have become familiar with the NASA Continuous Risk Management Process. In this process, risk is considered in terms of the probability that an undesired event will occur and the impact of the event, should it occur (ref., NASA-NPG: 7120.5). Risk management belongs in every part of every project and should be ongoing from start to finish. Another key point is that a risk is not a problem until it has happened. With that in mind, there is a six step cycle for continuous risk management that prevents risks from becoming problems. The steps are: identify, analyze, plan, track, control, and communicate & document. Incorporated in the first step are several methods to identify risks such as brainstorming and using lessons learned. Once a risk is identified, a risk statement is made on a risk information sheet consisting of a single condition and one or more consequences. There can also be a context section where the risk is explained in more detail. Additionally there are three main goals of analyzing a risk, which are evaluate, classify, and prioritize. Here is where a value is given to the attributes of a risk &e., probability, impact, and timeframe) based on a multi-level classification system (e.g., low, medium, high). It is important to keep in mind that the definitions of these levels are probably different for each project. Furthermore the risks can be combined into groups. Then, the risks are prioritized to see what risk is necessary to mitigate first. After the risks are analyzed, a plan is made to mitigate as many risks as feasible. Each risk should be assigned to someone in the project with knowledge in the area of the risk. Then the possible approaches to choose from are: research, accept, watch, or mitigate. Next, all risks, mitigated or not, are tracked either individually or in groups. As the plan is executed, risks are re-evaluated, and the attribute values are adjusted as necessary. Metrics

  2. Consumers' willingness to use a medication management service: the effect of medication-related worry and the social influence of the general practitioner.

    Science.gov (United States)

    Carter, Stephen R; Moles, Rebekah J; White, Lesley; Chen, Timothy F

    2013-01-01

    Some consumers at risk of experiencing medication-related problems have chosen not to use pharmacist-provided medication management services. Previous research has shown that consumers' willingness to use the Australian Home Medicines Review (HMR) service depends on the extent to which they believe that they will receive medication information to assist them with self-management. The aim of this study was to develop and test a model of willingness to use HMR among consumers who were eligible to receive the service but have not yet experienced it. Specifically, this study aimed to determine the effects of consumers' medication-related worry and the social influence of the consumer's general practitioner (GP) over willingness. A cross-sectional postal survey was conducted among 1600 members of Council on the Ageing (NSW, Australia). Respondents were included in the study if they had not experienced an HMR and were taking more than 5 medicines daily or more than 12 doses daily. Measurement scales were developed or were based on previous research. Confirmatory factor analysis was used to test the reliability and validity of the multi-item scales. Multiple regression analysis and structural equation modeling (SEM) were used to test the model. Surveys received from 390 respondents (24.3%) were analyzed. Respondents held overall low-to-neutral positive outcome expectancy (POE). The SEM analysis revealed that worry had a direct effect on POE (β=0.35, Psocial influence over willingness to use this medication management service. Copyright © 2013 Elsevier Inc. All rights reserved.

  3. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, Jeffrey H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2010-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

  4. Risk management, derivatives and shariah compliance

    Science.gov (United States)

    Bacha, Obiyathulla Ismath

    2013-04-01

    Despite the impressive growth of Islamic Banking and Finance (IBF), a number of weaknesses remain. The most important of this is perhaps the lack of shariah compliant risk management tools. While the risk sharing philosophy of Islamic Finance requires the acceptance of risk to justify returns, the shariah also requires adherents to avoid unnecessary risk-maysir. The requirement to avoid maysir is in essence a call for the prudent management of risk. Contemporary risk management revolves around financial engineering, the building blocks of which are financial derivatives. Despite the proven efficacy of derivatives in the management of risk in the conventional space, shariah scholars appear to be suspicious and uneasy with their use in IBF. Some have imposed outright prohibition of their use. This paper re-examines the issue of contemporary derivative instruments and shariah compliance. The shariah compatibility of derivatives is shown in a number of ways. First, by way of qualitative evaluation of whether derivatives can be made to comply with the key prohibitions of the sharia. Second, by way of comparing the payoff profiles of derivatives with risk sharing finance and Bai Salam contracts. Finally, the equivalence between shariah compliant derivatives like the IPRS and Islamic FX Currency Forwards with conventional ones is presented.

  5. Board of directors and risk management

    NARCIS (Netherlands)

    van der Elst, C.F.; Birkmose, H.; Neville, M.; Sorensen, K.

    2013-01-01

    The board of directors is responsible for an appropriate business risk management environment. The paper studies in a comparative way how legislators and courts fill this duty. We question whether the legislative and regulatory framework will improve the equilibrium between entrepreneurship and risk

  6. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, J.H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2009-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project

  7. Managing Risk Areas in Software Development Offshoring

    DEFF Research Database (Denmark)

    Persson, John Stouby; Schlichter, Bjarne Rerup

    2015-01-01

    Software companies are increasingly offshoring development to countries with high expertise at lower cost. Offshoring involves particular risk areas that if ignored increase the likelihood of failure. However, the offshoring client’s maturity level may influence the management of these risk areas...

  8. Self-management of vascular risk factors

    NARCIS (Netherlands)

    Sol-de Rijk, B.G.M.

    2009-01-01

    Summary The aim of this thesis was to provide insight into the potential of a self-management approach in treatment of vascular risk factors and to develop a self-management intervention. Furthermore to examine if this intervention, based on self-efficacy promoting theory, is effective in reducing

  9. Methodology of environmental risk assessment management

    Directory of Open Access Journals (Sweden)

    Saša T. Bakrač

    2012-04-01

    Full Text Available Successful protection of environment is mostly based on high-quality assessment of potential and present risks. Environmental risk management is a complex process which includes: identification, assessment and control of risk, namely taking measures in order to minimize the risk to an acceptable level. Environmental risk management methodology: In addition to these phases in the management of environmental risk, appropriate measures that affect the reduction of risk occurrence should be implemented: - normative and legal regulations (laws and regulations, - appropriate organizational structures in society, and - establishing quality monitoring of environment. The emphasis is placed on the application of assessment methodologies (three-model concept, as the most important aspect of successful management of environmental risk. Risk assessment methodology - European concept: The first concept of ecological risk assessment methodology is based on the so-called European model-concept. In order to better understand this ecological risk assessment methodology, two concepts - hazard and risk - are introduced. The European concept of environmental risk assessment has the following phases in its implementation: identification of hazard (danger, identification of consequences (if there is hazard, estimate of the scale of consequences, estimate of consequence probability and risk assessment (also called risk characterization. The European concept is often used to assess risk in the environment as a model for addressing the distribution of stressors along the source - path - receptor line. Risk assessment methodology - Canadian concept: The second concept of the methodology of environmental risk assessment is based on the so-called Canadian model-concept. The assessment of ecological risk includes risk arising from natural events (floods, extreme weather conditions, etc., technological processes and products, agents (chemical, biological, radiological, etc

  10. Interplanetary Supply Chain Risk Management

    Science.gov (United States)

    Galluzzi, Michael C.

    2018-01-01

    Emphasis on KSC ground processing operations, reduced spares up-mass lift requirements and campaign-level flexible path perspective for space systems support as Regolith-based ISM is achieved by; Network modeling for sequencing space logistics and in-space logistics nodal positioning to include feedstock. Economic modeling to assess ISM 3D printing adaption and supply chain risk.

  11. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  12. Managing sovereign credit risk in bond portfolios

    OpenAIRE

    Bruder, Benjamin; Hereil, Pierre; Roncalli, Thierry

    2011-01-01

    With the recent development of the European debt crisis, traditional index bond management has been severely called into question. We focus here on the risk issues raised by the classical market-capitalization weighting scheme. We propose an approach to properly measure sovereign credit risk in a fixed-income portfolio. For that, we assume that CDS spreads follow a SABR process and we derive a sovereign credit risk measure based on CDS spreads and duration of portfolio bonds. We then consider...

  13. Loss Database Architecture for Disaster Risk Management

    OpenAIRE

    RIOS DIAZ FRANCISCO; MARIN FERRER MONTSERRAT

    2018-01-01

    The reformed Union civil protection legislation (Decision on a Union Civil Protection Mechanism), which entered into force on 1 January 2014, is paving the way for more resilient communities by including key actions related to disaster prevention such as developing national risk assessments and the refinement of risk management planning. Under the Decision, Member States agreed to “develop risk assessments at national or appropriate sub- national level and make available to the Commission a s...

  14. Management Risk Reporting Practices and their determinants

    OpenAIRE

    VANDEMAELE, Sigrid; VERGAUWEN, Philip; MICHIELS, Anneleen

    2009-01-01

    In recent years, the need for effective risk management, internal control and transparent risk reporting has become an important corporate governance principle and a predominant issue in business. Already in 1987, the AICPA[ ] report stated that shareholders are increasingly demanding that financial statements include more information concerning the risks and uncertainties companies are facing (Schrand and Elliott, 1998). Abraham and Cox (2007) claim that this information can help investors t...

  15. Credit Risk Management in Chinese Banking Industry

    OpenAIRE

    Zhang, Lei

    2006-01-01

    Abstract Credit risk is by far the most important risk faced by banks, and it influences the bank profitability and its long-term operation significantly. Well management on credit risk can be a competitive advantage for banks in the competitive banking industry. Chinese banks suffer from serious financial fragility manifested by high proportions of NPLs and low capital adequacy ratios (Bonin and Huang, 2001). This dissertation examines the real credit performance of Chinese banks ba...

  16. Critical infrastructure cyber-security risk management

    OpenAIRE

    Spyridopoulos, T.; Maraslis, K.; Tryfonas, T.; Oikonomou, G.

    2017-01-01

    Traditional IT cyber-security risk management methods are based on the evaluation of risks calculated as the likelihood of cyber-security incidents occurring. However, these probabilities are usually estimations or guesses based on past experience and incomplete data. Incorrect estimations can lead to errors in the evaluation of risks that can ultimately affect the protection of the system. This issue is also transferred to methods used in Industrial Control Systems (ICSs), as they are mainly...

  17. Ethical Aspects of Radiation Risk Management

    OpenAIRE

    Wikman-Svahn, Per

    2012-01-01

    This thesis is based on the assumption that the intersection of moral philosophy and practical risk management is a rewarding area to study. In particular, the thesis assumes that concepts, ideas, and methods that are used in moral philosophy can be of great benefit for risk analysis, but also that practices in risk regulation provide a useful testing ground for moral philosophical theories. The thesis consists of an introduction and five articles. Article I is a review article on social and ...

  18. Information needs for risk management/communication

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, D.A. [Environmental Protection Agency, Washington, DC (United States)

    1990-12-31

    The hazardous waste cleanup program under the Comprehensive Environmental Response, Compensation, and Liability Act (Superfund) is delegated to the ten Regions of the US Environmental Protection Agency (EPA) and has, to date, identified more than 33,000 sites for consideration. The size and complexity of the program places great demands on those who would provide information to achieve national consistency in application of risk assessment while meeting site-specific needs for risk management and risk communication.

  19. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  20. Comparisons on International Approaches of Business and Project Risk Management

    OpenAIRE

    Nadia Carmen ENE

    2005-01-01

    In this article we intend to present a comparative approach between three recognized international methodologies for risk management: RISKMAN, Project Management Institute Methodology-PMBoK and Project Risk Analysis and Management Guide (produced by Association for Project Management).