Sample records for risk management advisory

  1. 77 FR 65000 - Drug Safety and Risk Management Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2012-10-24

    ...] Drug Safety and Risk Management Advisory Committee; Notice of Meeting AGENCY: Food and Drug...: Drug Safety and Risk Management Advisory Committee. General Function of the Committee: To provide... Use (ETASU) before CDER's Drug Safety and Risk Management Advisory Committee (DSaRM). The Agency plans...

  2. 78 FR 30929 - Drug Safety and Risk Management Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2013-05-23

    ...] Drug Safety and Risk Management Advisory Committee; Notice of Meeting AGENCY: Food and Drug...: Drug Safety and Risk Management Advisory Committee. General Function of the Committee: To provide... (REMS) with elements to assure safe use (ETASU) before its Drug Safety and Risk Management Advisory...

  3. 75 FR 17417 - Joint Meeting of the Arthritis Advisory Committee and the Drug Safety and Risk Management...

    Science.gov (United States)

    2010-04-06

    ...] Joint Meeting of the Arthritis Advisory Committee and the Drug Safety and Risk Management Advisory... Arthritis Advisory Committee and the Drug Safety and Risk Management Advisory Committee. This meeting was... Drug Safety and Risk Management Advisory Committee would be held on May 12, 2010. On page 10490, in the...

  4. 77 FR 75176 - Drug Safety and Risk Management Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2012-12-19

    ...] Drug Safety and Risk Management Advisory Committee; Notice of Meeting AGENCY: Food and Drug... being rescheduled due to the postponement of the October 29-30, 2012, Drug Safety and Risk Management... Committee: Drug Safety and Risk Management Advisory Committee. General Function of the Committee: To provide...

  5. 75 FR 23782 - Drug Safety and Risk Management Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2010-05-04

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-N-0001] Drug Safety and Risk Management Advisory Committee; Notice of Meeting AGENCY: Food and Drug...: Drug Safety and Risk Management Advisory Committee. General Function of the Committee: To provide...

  6. 75 FR 10490 - Joint Meeting of the Arthritis Drugs Advisory Committee and the Drug Safety and Risk Management...

    Science.gov (United States)

    2010-03-08

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-N-0001] Joint Meeting of the Arthritis Drugs Advisory Committee and the Drug Safety and Risk Management Advisory... Drug Safety and Risk Management Advisory Committee. General Function of the Committees: To provide...

  7. 76 FR 63929 - Joint Meeting of the Drug Safety and Risk Management Advisory Committee and the Dermatologic and...

    Science.gov (United States)

    2011-10-14

    ...] Joint Meeting of the Drug Safety and Risk Management Advisory Committee and the Dermatologic and... Administration (FDA). The meeting will be open to the public. Name of Committees: Drug Safety and Risk Management... Safe Use (ETASU) before its Drug Safety and Risk Management Advisory Committee (DSaRM). On December 1...

  8. 75 FR 36427 - Joint Meeting of the Arthritis Advisory Committee and the Drug Safety and Risk Management...

    Science.gov (United States)

    2010-06-25

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-N-0001] Joint Meeting of the Arthritis Advisory Committee and the Drug Safety and Risk Management Advisory Committee; Notice of Meeting AGENCY: Food and Drug Administration, HHS. ACTION: Notice. This notice...

  9. 76 FR 21877 - Environmental Management Advisory Board

    Science.gov (United States)

    2011-04-19

    ... DEPARTMENT OF ENERGY Environmental Management Advisory Board AGENCY: Department of Energy. ACTION: Notice of call for nominations for appointment to the Environmental Management Advisory Board. SUMMARY... Environmental Management Advisory Board. DATES: Nominations will be accepted through May 13, 2011. ADDRESSES...

  10. ITER management advisory committee meeting

    International Nuclear Information System (INIS)

    Yoshikawa, M.

    2001-01-01

    The ITER Management Advisory Committee (MAC) Meeting was held on 23 February in Garching, Germany. The main topics were: the consideration of the report by the Director on the ITER EDA Status, the review of the Work Programme, the review of the Joint Fund, the review of a schedule of ITER meetings, and the arrangements for termination and wind-up of the EDA

  11. ITER management advisory committee meeting

    International Nuclear Information System (INIS)

    Yoshikawa, M.

    2001-01-01

    The ITER Management Advisory Committee (MAC) Meeting was held in Vienna on 16 July 2001. It was the last MAC Meeting and the main topics were consideration of the report by the Director on the ITER EDA status, review of the Work Programme, review of the Joint Fund and arrangements for termination and wind-up of the EDA

  12. WEALTH MANAGEMENT THROUGH ROBO ADVISORY

    OpenAIRE

    Ishmeet Singh; Navjot Kaur

    2017-01-01

    Use of artificial intelligence is changing the working styles of human beings in almost every sphere. From Travel, health, education, communication and other related fields, it has now entered wealth management. A number of wealth management firms have adopted the artificial intelligence based services to the clients so that they are able to get investment advice any time as per their convenience. These services are quickly accessible, cheaper, transparent and unbiased. Since the advisory ser...

  13. 75 FR 51026 - Environmental Management Advisory Board

    Science.gov (United States)

    2010-08-18

    ... DEPARTMENT OF ENERGY Environmental Management Advisory Board AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the Environmental Management Advisory... EMAB is to provide the Assistant Secretary for Environmental Management (EM) with advice and...

  14. 76 FR 29752 - The President's Management Advisory Board (PMAB); Notification of Upcoming Public Advisory Meeting

    Science.gov (United States)

    2011-05-23

    ... Management, for the purpose of identifying leading business practices that have the potential to improve...'s Management Advisory Board (PMAB); Notification of Upcoming Public Advisory Meeting AGENCY: Office...: The President's Management Advisory Board, a Federal Advisory Committee established in accordance with...

  15. 77 FR 38065 - The President's Management Advisory Board (PMAB); Notification of Upcoming Public Advisory Meeting

    Science.gov (United States)

    2012-06-26

    ... for the implementation of best business practices to improve Federal Government management and... management, IT vendor performance management, Senior Executive Service (SES) leadership development and SES... President's Management Advisory Board (PMAB); Notification of Upcoming Public Advisory Meeting AGENCY...

  16. 77 FR 12841 - The President's Management Advisory Board (PMAB); Notification of Upcoming Public Advisory Meeting

    Science.gov (United States)

    2012-03-02

    ... for the implementation of best business practices to improve Federal Government management and... performance management, Senior Executive Service (SES) leadership development and SES performance appraisal... President's Management Advisory Board (PMAB); Notification of Upcoming Public Advisory Meeting AGENCY...

  17. ITER management advisory committee meeting in NAKA

    International Nuclear Information System (INIS)

    Yoshikawa, M.

    1999-01-01

    The ITER Management Advisory Committee (MAC) Meeting was held on 17 December 1999 in Naka, Japan. The main topics were the ITER EDA Status, Task Status Summary and Work Program and a schedule of ITER meetings

  18. 77 FR 4238 - Advisory Committee Management

    Science.gov (United States)

    2012-01-27

    ... DEPARTMENT OF STATE 22 CFR Part 8 RIN 1400-AC64 [Public Notice 7773] Advisory Committee Management.... Appendix, agency heads are required to establish uniform administrative guidelines and management controls... Committee Management. Accordingly, under the authority of 22 U.S.C. 2651a, for the reasons set forth in the...

  19. Risk management

    OpenAIRE

    Mcmanus, John

    2009-01-01

    Few projects are completed on time, on budget, and to their original requirement or specifications. Focusing on what project managers need to know about risk in the pursuit of delivering projects, Risk Management covers key components of the risk management process and the software development process, as well as best practices for risk identification, risk planning, and risk analysis. The book examines risk planning, risk analysis responses to risk, the tracking and modelling of risks, intel...

  20. 75 FR 65641 - Risk Communication Advisory Committee; Amendment of Notice

    Science.gov (United States)

    2010-10-26

    ...] Risk Communication Advisory Committee; Amendment of Notice AGENCY: Food and Drug Administration, HHS... meeting of the Risk Communication Advisory Committee. This meeting was announced in the Federal Register... Communication Advisory Committee would be held on November 8 and 9, 2010. On page 57280, in the first column...

  1. 76 FR 44017 - Risk Communication Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2011-07-22

    ...] Risk Communication Advisory Committee; Notice of Meeting AGENCY: Food and Drug Administration, HHS... Communication Advisory Committee. General Function of the Committee: To provide advice and recommendations to... and former members of the Risk Communication Advisory Committee. FDA intends to make background...

  2. 75 FR 5335 - Risk Communication Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2010-02-02

    ...] Risk Communication Advisory Committee; Notice of Meeting AGENCY: Food and Drug Administration, HHS... Communication Advisory Committee. General Function of the Committee: To provide advice and recommendations to... previously issued communications, emphasizing communications challenges. Examples, selected for illustrative...

  3. 76 FR 58519 - Risk Communication Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2011-09-21

    ...] Risk Communication Advisory Committee; Notice of Meeting AGENCY: Food and Drug Administration, HHS... Communication Advisory Committee. General Function of the Committee: To provide advice and recommendations to... discuss implications, for strategic communication, of recent theoretical developments on information use...

  4. Waste management advisory missions to developing countries

    International Nuclear Information System (INIS)

    Thomas, K.T.

    1990-01-01

    The IAEA's Waste Management Advisory Programme (WAMAP) was initiated in 1987 as an interregional technical co-operation project to complement other activities in radioactive waste management. Its creation gave greater recognition to the importance of the safe management of radioactive wastes and promotion of long-term waste management technical assistance strategies for developing countries. Over the past 4 years, international experts have reviewed the radioactive waste management programmes of 29 developing countries. Missions have been conducted within the framework of the IAEA's Waste Management Advisory Programme (WAMAP). Ten of these countries have nuclear power plants in operation or under construction or have nuclear fuel cycle facilities. Altogether, 23 have research reactors or centres, eight have uranium or thorium processing programmes or wastes, and nine essentially have only isotope applications involving the use of radiation sources

  5. 77 FR 26275 - Environmental Management Advisory Board Meeting

    Science.gov (United States)

    2012-05-03

    ...This notice announces a meeting of the Environmental Management Advisory Board (EMAB). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  6. 75 FR 7577 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2010-02-22

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act... areas of environmental restoration, waste management and related activities. Tentative Agenda: Call to...

  7. 75 FR 65615 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2010-10-26

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act... areas of environmental restoration, waste management and related activities. Tentative Agenda Call to...

  8. 76 FR 57981 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2011-09-19

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act... environmental restoration, waste management and related activities. Tentative Agenda Call to Order...

  9. 77 FR 2283 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2012-01-17

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act... environmental restoration, waste management and related activities. Tentative Agenda Call to Order...

  10. 76 FR 36100 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2011-06-21

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act... environmental restoration, waste management and related activities. Tentative Agenda Call to Order...

  11. 76 FR 17118 - Environmental Management Site-Specific Advisory Board Chairs

    Science.gov (United States)

    2011-03-28

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board Chairs AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB) Chairs. The Federal Advisory Committee Act (Pub... areas of environmental restoration, waste management, and related activities. Tentative Agenda Topics...

  12. 76 FR 62054 - Environmental Management Site-Specific Advisory Board Chairs

    Science.gov (United States)

    2011-10-06

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board Chairs AGENCY... of the Environmental Management Site-Specific Advisory Board (EM SSAB) Chairs. The Federal Advisory... environmental restoration, waste management, and related activities. Tentative Agenda Topics [cir] EM Program...

  13. 77 FR 29997 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2012-05-21

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act... environmental restoration, waste management and related activities. Tentative Agenda Call to Order...

  14. 77 FR 37390 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2012-06-21

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act... environmental restoration, waste management and related activities. Tentative Agenda: Call to Order...

  15. 75 FR 82003 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2010-12-29

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act... areas of environmental restoration, waste management and related activities. Tentative Agenda: Call to...

  16. 75 FR 19379 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2010-04-14

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act... areas of environmental restoration, waste management and related activities. Tentative Agenda Call to...

  17. 76 FR 78909 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2011-12-20

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act... the areas of environmental restoration, waste management, and related activities. Tentative Agenda...

  18. 77 FR 6790 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2012-02-09

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act... environmental restoration, waste management and related activities. Tentative Agenda Call to Order...

  19. 75 FR 51026 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2010-08-18

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act... the areas of environmental restoration, waste management and related activities. Tentative Agenda...

  20. 77 FR 51789 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2012-08-27

    ... management and related activities. Tentative Agenda Call to Order, Introductions, Review of Agenda... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act...

  1. 77 FR 70450 - Risk Communication Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2012-11-26

    ...] Risk Communication Advisory Committee; Notice of Meeting AGENCY: Food and Drug Administration, HHS... Communication Advisory Committee. General Function of the Committee: To provide advice and recommendations to... 1. Contact Person: Lee L. Zwanziger, Risk Communication Staff, Food and Drug Administration, 10903...

  2. 77 FR 62242 - Risk Communication Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2012-10-12

    ...] Risk Communication Advisory Committee; Notice of Meeting AGENCY: Food and Drug Administration, HHS... Communication Advisory Committee. General Function of the Committee: To provide advice and recommendations to... Person: Lee L. Zwanziger, Risk Communication Staff, Office of Planning, Food and Drug Administration...

  3. 75 FR 20608 - Risk Communication Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2010-04-20

    ...] Risk Communication Advisory Committee; Notice of Meeting AGENCY: Food and Drug Administration, HHS... Communication Advisory Committee. General Function of the Committee: To provide advice and recommendations to... relevant to improving risk communication at FDA, and discuss applications or gaps for strategic planning of...

  4. 77 FR 20871 - Audit and Financial Management Advisory (AFMAC)

    Science.gov (United States)

    2012-04-06

    ... SMALL BUSINESS ADMINISTRATION Audit and Financial Management Advisory (AFMAC) AGENCY: U.S. Small... Financial Management Advisory (AFMAC). The meeting will be open to the public. DATES: The meeting will be... Agency's financial management, including the financial reporting process, systems of internal controls...

  5. Risk management.

    Science.gov (United States)

    Chambers, David W

    2010-01-01

    Every plan contains risk. To proceed without planning some means of managing that risk is to court failure. The basic logic of risk is explained. It consists in identifying a threshold where some corrective action is necessary, the probability of exceeding that threshold, and the attendant cost should the undesired outcome occur. This is the probable cost of failure. Various risk categories in dentistry are identified, including lack of liquidity; poor quality; equipment or procedure failures; employee slips; competitive environments; new regulations; unreliable suppliers, partners, and patients; and threats to one's reputation. It is prudent to make investments in risk management to the extent that the cost of managing the risk is less than the probable loss due to risk failure and when risk management strategies can be matched to type of risk. Four risk management strategies are discussed: insurance, reducing the probability of failure, reducing the costs of failure, and learning. A risk management accounting of the financial meltdown of October 2008 is provided.

  6. 76 FR 61672 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2011-10-05

    ... advice to the Assistant Secretary of Commerce for Communications and Information on spectrum management... Communications and Information on needed reforms to domestic spectrum policies and management in order to... Spectrum Management Advisory Committee Meeting AGENCY: National Telecommunications and Information...

  7. 77 FR 69597 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2012-11-20

    ... advice to the Assistant Secretary of Commerce for Communications and Information on spectrum management... Communications and Information on needed reforms to domestic spectrum policies and management in order to... Spectrum Management Advisory Committee Meeting AGENCY: National Telecommunications and Information...

  8. 77 FR 35941 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2012-06-15

    ... advice to the Assistant Secretary of Commerce for Communications and Information on spectrum management... Communications and Information on needed reforms to domestic spectrum policies and management in order to... Spectrum Management Advisory Committee Meeting AGENCY: National Telecommunications and Information...

  9. 78 FR 35260 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2013-06-12

    ... advice to the Assistant Secretary of Commerce for Communications and Information on spectrum management... Communications and Information on needed reforms to domestic spectrum policies and management in order to... Spectrum Management Advisory Committee Meeting AGENCY: National Telecommunications and Information...

  10. 76 FR 23796 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2011-04-28

    ... advice to the Assistant Secretary of Commerce for Communications and Information on spectrum management... Communications and Information on needed reforms to domestic spectrum policies and management in order to... Spectrum Management Advisory Committee Meeting AGENCY: National Telecommunications and Information...

  11. 78 FR 49260 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2013-08-13

    ... advice to the Assistant Secretary of Commerce for Communications and Information on spectrum management... Communications and Information on needed reforms to domestic spectrum policies and management in order to... Spectrum Management Advisory Committee Meeting AGENCY: National Telecommunications and Information...

  12. 77 FR 48968 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2012-08-15

    ... advice to the Assistant Secretary of Commerce for Communications and Information on spectrum management... Communications and Information on needed reforms to domestic spectrum policies and management in order to... Spectrum Management Advisory Committee Meeting AGENCY: National Telecommunications and Information...

  13. 78 FR 7758 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2013-02-04

    ... advice to the Assistant Secretary of Commerce for Communications and Information on spectrum management... Communications and Information on needed reforms to domestic spectrum policies and management in order to... Spectrum Management Advisory Committee Meeting AGENCY: National Telecommunications and Information...

  14. 78 FR 23541 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2013-04-19

    ... advice to the Assistant Secretary of Commerce for Communications and Information on spectrum management... Communications and Information on needed reforms to domestic spectrum policies and management in order to... Spectrum Management Advisory Committee Meeting AGENCY: National Telecommunications and Information...

  15. 77 FR 5494 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2012-02-03

    ... advice to the Assistant Secretary of Commerce for Communications and Information on spectrum management... Communications and Information on needed reforms to domestic spectrum policies and management in order to... Spectrum Management Advisory Committee Meeting AGENCY: National Telecommunications and Information...

  16. 78 FR 57370 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2013-09-18

    ... advice to the Assistant Secretary of Commerce for Communications and Information on spectrum management... Communications and Information on needed reforms to domestic spectrum policies and management in order to... Spectrum Management Advisory Committee Meeting AGENCY: National Telecommunications and Information...

  17. 77 FR 67808 - Environmental Management Advisory Board Meeting

    Science.gov (United States)

    2012-11-14

    ... DEPARTMENT OF ENERGY Environmental Management Advisory Board Meeting AGENCY: Department of Energy. ACTION: Notice of Open Meeting. SUMMARY: This notice announces a meeting of the Environmental Management... Assistant Secretary for Environmental Management (EM) with advice and recommendations on corporate issues...

  18. 75 FR 57279 - Risk Communication Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2010-09-20

    ...] Risk Communication Advisory Committee; Notice of Meeting AGENCY: Food and Drug Administration, HHS... Communication Advisory Committee. General Function of the Committee: To provide advice and recommendations to... Committee will hear and discuss developments in FDA's ongoing communications programs, such as FDA's...

  19. 76 FR 16427 - Risk Communication Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2011-03-23

    ...] Risk Communication Advisory Committee; Notice of Meeting AGENCY: Food and Drug Administration, HHS... Communication Advisory Committee. General Function of the Committee: To provide advice and recommendations to... discuss developments in FDA's ongoing communications programs. The discussion will focus on the use of...

  20. Research Award: Risk Management and Internal Audit (RMIA)

    International Development Research Centre (IDRC) Digital Library (Canada)

    KKearney

    2011-09-12

    Sep 12, 2011 ... management, internal audit and advisory services. ... in the discharge of their responsibilities by providing assurance and advice on ... project management principles, enterprise risk management practices, and internal audit ...

  1. Quantitative risk assessment of foods containing peanut advisory labeling.

    Science.gov (United States)

    Remington, Benjamin C; Baumert, Joseph L; Marx, David B; Taylor, Steve L

    2013-12-01

    Foods with advisory labeling (i.e. "may contain") continue to be prevalent and the warning may be increasingly ignored by allergic consumers. We sought to determine the residual levels of peanut in various packaged foods bearing advisory labeling, compare similar data from 2005 and 2009, and determine any potential risk for peanut-allergic consumers. Of food products bearing advisory statements regarding peanut or products that had peanut listed as a minor ingredient, 8.6% and 37.5% contained detectable levels of peanut (>2.5 ppm whole peanut), respectively. Peanut-allergic individuals should be advised to avoid such products regardless of the wording of the advisory statement. Peanut was detected at similar rates and levels in products tested in both 2005 and 2009. Advisory labeled nutrition bars contained the highest levels of peanut and an additional market survey of 399 products was conducted. Probabilistic risk assessment showed the risk of a reaction to peanut-allergic consumers from advisory labeled nutrition bars was significant but brand-dependent. Peanut advisory labeling may be overused on some nutrition bars but prudently used on others. The probabilistic approach could provide the food industry with a quantitative method to assist with determining when advisory labeling is most appropriate. Copyright © 2013 Elsevier Ltd. All rights reserved.

  2. 77 FR 2133 - Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2012-01-13

    ..., pursuant to 5 U.S.C. App. 2, Sec. 10(a)(2), that a meeting will be held at the Hay-Adams Hotel, 16th Street... management advisory committee: Treasury Borrowing Advisory Committee of the Securities Industry and Financial... his designate that the Committee discuss particular issues and conduct a working session. Following...

  3. 78 FR 62941 - Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2013-10-22

    ..., pursuant to 5 U.S.C. App. 2, Sec. 10(a)(2), that a meeting will be held at the Hay-Adams Hotel, 16th Street... management advisory committee: Treasury Borrowing Advisory Committee of The Securities Industry and Financial... his designate that the Committee discuss particular issues and conduct a working session. Following...

  4. 78 FR 22034 - Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2013-04-12

    ..., pursuant to 5 U.S.C. App. 2, Sec. 10(a)(2), that a meeting will be held at the Hay-Adams Hotel, 16th Street... management advisory committee: Treasury Borrowing Advisory Committee of The Securities Industry and Financial... his designate that the Committee discuss particular issues and conduct a working session. Following...

  5. Fourteenth meeting of the ITER management advisory committee

    International Nuclear Information System (INIS)

    Yoshikawa, M.

    1998-01-01

    Following the Director's report on the progress made in the ITER Engineering Design Activities, the ITER Management Advisory Committee reviewed the Task Status Summary, Work Program and Task Agreements for EDA Extension, Joint Fund and a schedule of ITER meetings

  6. 75 FR 38779 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2010-07-06

    ... DEPARTMENT OF COMMERCE National Telecommunications and Information Administration Commerce... Administration, U.S. Department of Commerce. ACTION: Notice of open meeting. SUMMARY: This notice announces a public meeting of the Commerce Spectrum Management Advisory Committee (Committee). The Committee provides...

  7. 75 FR 7234 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2010-02-18

    ... DEPARTMENT OF COMMERCE National Telecommunications and Information Administration Commerce... Administration, U.S. Department of Commerce. ACTION: Notice of Open Meeting. SUMMARY: This notice announces a public meeting of the Commerce Spectrum Management Advisory Committee (Committee). The Committee provides...

  8. 75 FR 64699 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2010-10-20

    ... DEPARTMENT OF COMMERCE National Telecommunications and Information Administration Commerce... Administration, U.S. Department of Commerce. ACTION: Notice of open meeting. SUMMARY: This notice announces a public meeting of the Commerce Spectrum Management Advisory Committee (Committee). The Committee provides...

  9. 75 FR 21602 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2010-04-26

    ... DEPARTMENT OF COMMERCE National Telecommunications and Information Administration Commerce... Administration, U.S. Department of Commerce. ACTION: Notice of open meeting. SUMMARY: This notice announces a public meeting of the Commerce Spectrum Management Advisory Committee (Committee). The Committee provides...

  10. 75 FR 75968 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2010-12-07

    ... DEPARTMENT OF COMMERCE National Telecommunications and Information Administration Commerce... Administration, U.S. Department of Commerce. ACTION: Notice of open meeting. SUMMARY: This notice announces a public meeting of the Commerce Spectrum Management Advisory Committee (Committee). The Committee provides...

  11. 75 FR 72792 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2010-11-26

    ... DEPARTMENT OF COMMERCE National Telecommunications and Information Administration Commerce... Administration, U.S. Department of Commerce. ACTION: Notice of open meeting by teleconference. SUMMARY: This notice announces a public meeting of the Commerce Spectrum Management Advisory Committee (Committee...

  12. 77 FR 25145 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2012-04-27

    ... DEPARTMENT OF COMMERCE National Telecommunications and Information Administration Commerce... Administration, U.S. Department of Commerce. ACTION: Notice of open meeting. SUMMARY: This notice announces a public meeting of the Commerce Spectrum Management Advisory Committee (Committee). The Committee provides...

  13. The ITER management advisory committee (MAC) meeting in Cadarache

    International Nuclear Information System (INIS)

    Yoshikawa, M.

    1999-01-01

    The ITER management advisory committee meeting was held on 8 March in Cadarache, France. The main topics were the ITER EDA Status Report in the period between the ITER Meeting in Yokohama (October 1990) and February 1999. In particular, the management advisory committee shares the director's concern about the uncertainties against which the whole project operates at present. They also noted that the definition of an appropriate framework for continued US involvement in on-going projects is a very important issue

  14. 78 FR 70954 - Risk Communications Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2013-11-27

    ... awareness and understanding of the key risk messages, as well as whether the communications are having the... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2013-N-0001] Risk Communications Advisory Committee; Notice of Meeting AGENCY: Food and Drug Administration, HHS...

  15. 77 FR 22772 - Environmental Management Site-Specific Advisory Board

    Science.gov (United States)

    2012-04-17

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board AGENCY: Office of Environmental Management, Department of Energy. ACTION: Notice of renewal. SUMMARY: Pursuant to Section 14(a)(2... Secretariat, General Services Administration, notice is hereby given that the Environmental Management Site...

  16. 75 FR 9885 - Environmental Management Advisory Board Meeting

    Science.gov (United States)

    2010-03-04

    ... DEPARTMENT OF ENERGY Environmental Management Advisory Board Meeting AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the Environmental Management... purpose of EMAB is to provide the Assistant Secretary for Environmental Management (EM) with advice and...

  17. 76 FR 31319 - Environmental Management Advisory Board Meeting

    Science.gov (United States)

    2011-05-31

    ... DEPARTMENT OF ENERGY Environmental Management Advisory Board Meeting AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the Environmental Management... purpose of EMAB is to provide the Assistant Secretary for Environmental Management (EM) with advice and...

  18. 76 FR 71959 - Environmental Management Advisory Board Meeting

    Science.gov (United States)

    2011-11-21

    ... DEPARTMENT OF ENERGY Environmental Management Advisory Board Meeting AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the Environmental Management... of EMAB is to provide the Assistant Secretary for Environmental Management (EM) with advice and...

  19. 76 FR 5364 - Environmental Management Advisory Board Meeting

    Science.gov (United States)

    2011-01-31

    ... DEPARTMENT OF ENERGY Environmental Management Advisory Board Meeting AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the Environmental Management... Board: The purpose of EMAB is to provide the Assistant Secretary for Environmental Management (EM) with...

  20. 76 FR 5147 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2011-01-28

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management and...

  1. 77 FR 59598 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2012-09-28

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management and...

  2. 75 FR 54600 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2010-09-08

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management and...

  3. 75 FR 66074 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2010-10-27

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management and...

  4. 75 FR 24686 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2010-05-05

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management and...

  5. 75 FR 9404 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2010-03-02

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management and...

  6. 75 FR 82004 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2010-12-29

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Nevada AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management, and...

  7. 77 FR 4027 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2012-01-26

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Nevada AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management, and...

  8. 77 FR 43583 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2012-07-25

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management and...

  9. 75 FR 61711 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2010-10-06

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management and...

  10. 76 FR 80354 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2011-12-23

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Nevada AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management, and...

  11. 75 FR 82002 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2010-12-29

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management and...

  12. 76 FR 4645 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2011-01-26

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Hanford AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Hanford. The Federal Advisory Committee Act... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management, and...

  13. 75 FR 6018 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2010-02-05

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Hanford AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Hanford (known locally as the Hanford Advisory... and site management in the areas of environmental restoration, waste management, and related...

  14. 76 FR 48148 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2011-08-08

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management and...

  15. 41 CFR 102-3.95 - What principles apply to the management of advisory committees?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What principles apply to...-FEDERAL ADVISORY COMMITTEE MANAGEMENT How Are Advisory Committees Managed? § 102-3.95 What principles... principles to the management of their advisory committees: (a) Provide adequate support. Before establishing...

  16. Managing risks

    International Nuclear Information System (INIS)

    Nathwani, J.S.

    1993-01-01

    The three principles to guide regulating authorities are: Risks shall be managed to maximize the total expected net benefit to society; The safety benefit to be promoted is quality-adjusted life expectancy; Decisions for the public in regard to health and safety must be open and apply across the entire range of hazards to life and health. Based on the principle that excessive spending on health and safety, or lack of necessary development, may cause poverty and thereby actually decrease (adjusted) life expectancy, the author has developed a Life Product Index which gives comparable results to the Human Development Index promoted by the United Nations Development Program. These two social indicators can be used for purposes such as project evaluation, choosing between alternative technologies, or evaluation of health and safety programs

  17. 75 FR 13269 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2010-03-19

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Hanford AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Hanford. The Federal Advisory Committee Act... is to make recommendations to DOE-EM and site management in the areas of environmental restoration...

  18. 75 FR 65310 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2010-10-22

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Nevada AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada Test Site. The Federal Advisory... Board is to make recommendations to DOE-EM and site management in the areas of environmental restoration...

  19. 75 FR 8050 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2010-02-23

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Hanford AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Hanford. The Federal Advisory Committee Act... is to make recommendations to DOE-EM and site management in the areas of environmental restoration...

  20. 76 FR 80355 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2011-12-23

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act... make recommendations to DOE-EM and site management in the areas of environmental restoration, waste...

  1. 76 FR 61350 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2011-10-04

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act... make recommendations to DOE-EM and site management in the areas of environmental restoration, waste...

  2. 77 FR 12044 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2012-02-28

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Nevada AGENCY... Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub... Board is to make recommendations to DOE-EM and site management in the areas of environmental restoration...

  3. 78 FR 14088 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-03-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act requires that public notice of this meeting be announced in the Federal Register.

  4. Risk management

    International Nuclear Information System (INIS)

    Magne, L.

    1999-01-01

    There is always a risk of an accident occurring at a nuclear power plant, however small. The problem lies in estimating the probability of it occurring. The method of probabilistic safety assessment provides this estimate, and by identifying the sources of potential risk, makes it possible to prevent them from occurring. It is not, however, a substitute for other decision-making processes. (author)

  5. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  6. 77 FR 43574 - Caribbean Fishery Management Council; Advisory Panel Meeting

    Science.gov (United States)

    2012-07-25

    ... Fishery Management Council; Advisory Panel Meeting AGENCY: National Marine Fisheries Service (NMFS... Windward Passage Hotel, Veteran's Drive Water Front, Charlotte Amalie, St. Thomas, USVI. FOR FURTHER... meeting date. Dated: July 20, 2012. Tracey L. Thompson, Acting Deputy Director, Office of Sustainable...

  7. The ITER Management Advisory Committee (MAC) meeting in Garching

    International Nuclear Information System (INIS)

    Yoshikawa, M.

    1999-01-01

    The ITER management advisory committee meeting was held on 22-23 July 1999 in Garching, Germany. The main topics were the ITER EDA status, task status summary and work program, joint fund, information technology needs at the ITER joint work sites, the disposition of R and D components and a schedule of ITER meetings

  8. Management Advisory Memorandum of FAA Service Agreement, JFK Control Tower

    Science.gov (United States)

    1997-02-12

    This Management Advisory Memorandum is in response to the Federal Aviation Administration's (FAA) request to audit costs claimed for Fiscal Year (FY) 1995 by the Port Authority of New York and New Jersey (Port Authority) related to Contract No. DTFA0...

  9. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  10. 78 FR 20327 - Joint Meeting of the Advisory Committee for Reproductive Health Drugs and the Drug Safety and...

    Science.gov (United States)

    2013-04-04

    ... Management Advisory Committee; Amendment of Notice AGENCY: Food and Drug Administration, HHS. ACTION: Notice... of the Advisory Committee for Reproductive Health Drugs and the Drug Safety and Risk Management... Advisory Committee for Reproductive Health Drugs and the Drug Safety and Risk Management Advisory Committee...

  11. 75 FR 56526 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2010-09-16

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Portsmouth AGENCY... Initiative Workshop of the Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management and...

  12. ITER management advisory committee (MAC) meeting in Naka

    International Nuclear Information System (INIS)

    Yoshikawa, M.

    2000-01-01

    The ITER Management Advisory Committee (MAC) Meeting was held on 28 June 2000 in Moskow, Russia. The main topics were the consideration of the report by the director on the ITER EDA status, the review of the work program, the review of the joint fund, the review of a schedule of ITER meetings and initial discussion and consideration on the disposition of R and D hardware and facilities and other dispositions relating to the termination of the EDA

  13. 76 FR 50204 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2011-08-12

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Nevada AGENCY...-Wide Environmental Impact Statement (EIS) Committee of the Environmental Management Site- Specific... management in the areas of environmental restoration, waste management, and related activities. Purpose of...

  14. Enterprise risk management

    Energy Technology Data Exchange (ETDEWEB)

    Eaton, C. [Enbridge, Calgary, AB (Canada)

    2015-07-01

    Enterprise risk management (ERM) is a relative new, holistic and strategic approach for managing risks in modern organizations. ERM builds on and extends traditional risk management (RM). Risk is the effect of uncertainty on objectives - positive and/or negative. Risk management is a set of practices used to understand and address risk. ERM is a form of RM that emphasizes risk aggregation and integration. Risk aggregation is combining individual risks into categories ({sup r}olled up{sup )}. risk integration is embedding RM into organizational contexts ({sup b}uilt in{sup )}.

  15. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  16. Risk management and safety

    International Nuclear Information System (INIS)

    Niehaus, F.; Novegno, A.

    1985-01-01

    Risk assessment, including probabilistic analyses, has made great progress over the past decade. In spite of the inherent uncertainties it has now become possible to utilize methods and results for decision making at various levels. This paper will, therefore, review risk management in industrial installations, risk management for energy safety policy and prospects of risk management in highly industrialized areas. (orig.) [de

  17. 77 FR 2282 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2012-01-17

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Paducah AGENCY... the Environmental Management Site-Specific Advisory Board, Paducah. This notice announces the... Management Officer. [FR Doc. 2012-831 Filed 1-12-12; 4:15 pm] BILLING CODE 6405-01-P ...

  18. 76 FR 20651 - Environmental Management Site-Specific Advisory Board Chairs

    Science.gov (United States)

    2011-04-13

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board Chairs AGENCY... a meeting on April 13-14, 2011 of the Environmental Management Site-Specific Advisory Board Chairs... R. Butler, Acting Deputy Committee Management Officer. [FR Doc. 2011-8970 Filed 4-8-11; 4:15 pm...

  19. 76 FR 31305 - Pacific Whiting; Advisory Panel and Joint Management Committee

    Science.gov (United States)

    2011-05-31

    ... experienced in the harvesting, processing, marketing, management, conservation, or research of the offshore... Whiting; Advisory Panel and Joint Management Committee AGENCY: National Oceanic and Atmospheric.... SUMMARY: NMFS solicits nominations for the Advisory Panel (AP) and the Joint Management Committee (JMC) on...

  20. 77 FR 74838 - Environmental Management Site-Specific Advisory Board, Northern New Mexico

    Science.gov (United States)

    2012-12-18

    ...This notice announces a combined meeting of the Environmental Monitoring, Surveillance and Remediation Committee and Waste Management Committee of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico (known locally as the Northern New Mexico Citizens' Advisory Board [NNMCAB]). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  1. 78 FR 10612 - Environmental Management Site-Specific Advisory Board, Northern New Mexico

    Science.gov (United States)

    2013-02-14

    ...This notice announces a combined meeting of the Environmental Monitoring, Surveillance and Remediation Committee and Waste Management Committee of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico (known locally as the Northern New Mexico Citizens' Advisory Board [NNMCAB]). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  2. 77 FR 64800 - Environmental Management Site-Specific Advisory Board, Northern New Mexico

    Science.gov (United States)

    2012-10-23

    ...This notice announces a combined meeting of the Environmental Monitoring, Surveillance and Remediation Committee and Waste Management Committee of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico (known locally as the Northern New Mexico Citizens' Advisory Board [NNMCAB]). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  3. 78 FR 4140 - Environmental Management Site-Specific Advisory Board, Northern New Mexico

    Science.gov (United States)

    2013-01-18

    ...This notice announces a combined meeting of the Environmental Monitoring, Surveillance and Remediation Committee and Waste Management Committee of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico (known locally as the Northern New Mexico Citizens' Advisory Board [NNMCAB]). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  4. A History of the Environmental Management Advisory Board: 20 Years of Service and Partnership - 13219

    International Nuclear Information System (INIS)

    Ellis, Kristen; Schmitt, Elizabeth

    2013-01-01

    The Environmental Management Advisory Board (EMAB or Board) was chartered under the Federal Advisory Committee Act (FACA) in 1992 to provide the Assistant Secretary for Environmental Management (EM) with independent and external advice, information, and recommendations on corporate issues relating to accelerated site clean-up and risk reduction throughout the EM complex. Over the course of the past 20 years, the composition and focus of the Board have varied widely to address the changing needs of the program. EMAB began as the Environmental Restoration and Waste Management Advisory Committee, formed to provide advice on an EM Programmatic Environmental Impact Statement. In 1994, the Board was restructured to function more as an executive-level, limited member advisory board whose membership provides insight of leading industry experts and the viewpoints of representatives from critical stakeholder constituencies. Throughout the 20 years of its existence, EMAB has covered a wide variety of topics and produced nearly 200 recommendations. These recommendations have resulted in several policy changes and improvements within EM. Most recently, EMAB has been credited for its contribution to the EM Energy Park Initiative, forerunner of the DOE Asset Revitalization Initiative; creation of the EM Offices of Communications and External Affairs; improvement of acquisition and project management strategies and culture; and several recommendations related to the Waste Treatment Plant and the tank waste programs at Hanford and the Savannah River Site. The wealth of experience and knowledge the Assistant Secretary can leverage through utilization of the Board continues to support fulfillment of EM's mission. In commemoration of EMAB's 20. anniversary, this paper will provide further context for the evolution of the Board, the role FACA plays in its administration, and a look at the members' current objectives and EM's expectations for the future. (authors)

  5. A History of the Environmental Management Advisory Board: 20 Years of Service and Partnership - 13219

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, Kristen; Schmitt, Elizabeth [Environmental Management Advisory Board, US DoE (United States)

    2013-07-01

    The Environmental Management Advisory Board (EMAB or Board) was chartered under the Federal Advisory Committee Act (FACA) in 1992 to provide the Assistant Secretary for Environmental Management (EM) with independent and external advice, information, and recommendations on corporate issues relating to accelerated site clean-up and risk reduction throughout the EM complex. Over the course of the past 20 years, the composition and focus of the Board have varied widely to address the changing needs of the program. EMAB began as the Environmental Restoration and Waste Management Advisory Committee, formed to provide advice on an EM Programmatic Environmental Impact Statement. In 1994, the Board was restructured to function more as an executive-level, limited member advisory board whose membership provides insight of leading industry experts and the viewpoints of representatives from critical stakeholder constituencies. Throughout the 20 years of its existence, EMAB has covered a wide variety of topics and produced nearly 200 recommendations. These recommendations have resulted in several policy changes and improvements within EM. Most recently, EMAB has been credited for its contribution to the EM Energy Park Initiative, forerunner of the DOE Asset Revitalization Initiative; creation of the EM Offices of Communications and External Affairs; improvement of acquisition and project management strategies and culture; and several recommendations related to the Waste Treatment Plant and the tank waste programs at Hanford and the Savannah River Site. The wealth of experience and knowledge the Assistant Secretary can leverage through utilization of the Board continues to support fulfillment of EM's mission. In commemoration of EMAB's 20. anniversary, this paper will provide further context for the evolution of the Board, the role FACA plays in its administration, and a look at the members' current objectives and EM's expectations for the future. (authors)

  6. 76 FR 55370 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2011-09-07

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Nevada AGENCY...-Wide Environmental Impact Statement (EIS) Committee of the Environmental Management Site- Specific... the areas of environmental restoration, waste management, and related activities. Purpose of the...

  7. Risk management at university

    OpenAIRE

    Ivanova, H.; Abramovich, S.

    2013-01-01

    This article observes the basic recommendations for the risk management system in higher education as an example Yanka Kupala State University of Grodno. Consider the risk-management standard that based in a process approach

  8. Management of business risks

    OpenAIRE

    BAZARBAY A.

    2015-01-01

    The article presents methodological ideas concerning the problem of risk management. Special attention is paid to increasing of enterprises' operating efficiency by means of risk-management system development in business organizations.

  9. Eighteenth annual report of: The Radioactive Waste Management Advisory Committee

    International Nuclear Information System (INIS)

    1998-07-01

    This annual report reviews the RWMAC's work programme and progress made in 1997-1998; discusses operational and administrative matters including financial management and policy review; and presents the 1998 RWMAC work programme. Particular chapters are devoted to the management of intermediate and high level radioactive waste and spent fuel; the Dounreay Nuclear Establishment; the radioactive waste discharge authorisations. The document presents the RWMAC's review of the Ministry of Defence's radioactive waste management practices. A separate chapter is devoted to the study of radioactive waste management practices in Spain. Annexes to the report include terms of reference and membership of the Radioactive Waste Management Advisory Committee; RWMAC financial statement; declaration and register of member's interests; the RWMAC's 1998 work programme; the RWMAC's response to the Government on Proposals for the control and remediation of radioactively contaminated land

  10. Rethinking risk management

    International Nuclear Information System (INIS)

    Kloman, H.F.

    1992-01-01

    The purpose of this paper is to bring together the ideas of those who currently practice the many different forms of risk management on a global basis. These forms include guidance of public policy on macro risks, risk financing and insurance for many larger commercial organizations, managing credit, currency and interest rate risks for financial institutions, plus other extensions of risk management including security, quality control, and quality assurance in a health-care environment

  11. 76 FR 82031 - Commercial Space Transportation Advisory Committee; Public Teleconference

    Science.gov (United States)

    2011-12-29

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Commercial Space Transportation Advisory Committee; Public Teleconference AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of Commercial Space Transportation Advisory Committee Risk Management Working Group Teleconference...

  12. Commodity risk management

    Directory of Open Access Journals (Sweden)

    Hilary Till

    2016-09-01

    Full Text Available This article discusses the practical issues involved in applying a disciplined risk management methodology to commodity futures trading. Accordingly, the paper shows how to apply methodologies derived from both conventional asset management and hedge fund management to futures trading. The article also discusses some of the risk management issues that are unique to leveraged futures trading.

  13. 76 FR 15057 - Notice of Proposed Exemption; BlackRock, Inc. and Its Investment Advisory, Investment Management...

    Science.gov (United States)

    2011-03-18

    ... Administration Notice of Proposed Exemption; BlackRock, Inc. and Its Investment Advisory, Investment Management...; BlackRock, Inc. and Its Investment Advisory, Investment Management and Broker-Dealer Affiliates and... its investment advisory, investment management and broker-dealer affiliates and their successors. The...

  14. Certification and risk management

    International Nuclear Information System (INIS)

    Villanueva Fernandez, M.

    2015-01-01

    Nowadays more organizations are increasingly aware of the importance of properly managing the uncertainty of its activities and build competitive advantages through the identification, assessment and management of risks that they face. Risk management is also an aspect of great importance within the new version of ISO fact it is one of the most innovative and also the most laborious, because an appropriate risk management achieves expected results and customer satisfaction. In conclusion, risk management is a new field of business and can be considered a cross-cutting component for other relevant factors of organizational change management. (Author)

  15. Consumer attitudes and risks associated with packaged foods having advisory labeling regarding the presence of peanuts.

    Science.gov (United States)

    Hefle, Susan L; Furlong, Terence J; Niemann, Lynn; Lemon-Mule, Heather; Sicherer, Scott; Taylor, Steve L

    2007-07-01

    Foods with advisory labeling (eg, "may contain") are increasingly prevalent. Consumers with food allergies might ignore advisory labeling advice. We sought to determine whether consumers with food allergy heeded advisory labels and whether products with advisory labels contained detectable peanut allergen. Surveys (n = 625 in 2003 and n = 645 in 2006) were conducted at Food Allergy & Anaphylaxis Network patient conferences. Food products bearing advisory statements regarding peanuts were analyzed for the presence of peanut. Consumers were less likely to heed advisory labeling in 2006 (75%) compared with in 2003 (85%, P 1 mg of peanut or >0.25 mg of peanut protein) were detected in only 13 of 200 such products. Consumers with food allergy are increasingly ignoring advisory labeling. Because food products with advisory labeling do contain detectable levels of peanuts, a risk exists to consumers choosing to eat such foods. The format of the labeling statement did not influence the likelihood of finding detectable peanut, except for products listing peanuts as a minor ingredient, but did influence the choices of consumers with food allergy. Allergic patients are taking risks by increasingly disregarding advisory labeling.

  16. [Global risk management].

    Science.gov (United States)

    Sghaier, W; Hergon, E; Desroches, A

    2015-08-01

    Risk management is a fundamental component of any successful company, whether it is in economic, societal or environmental aspect. Risk management is an especially important activity for companies that optimal security challenge of products and services is great. This is the case especially for the health sector institutions. Risk management is therefore a decision support tool and a means to ensure the sustainability of an organization. In this context, what methods and approaches implemented to manage the risks? Through this state of the art, we are interested in the concept of risk and risk management processes. Then we focus on the different methods of risk management and the criteria for choosing among these methods. Finally we highlight the need to supplement these methods by a systemic and global approach including through risk assessment by the audits. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  17. Agile risk management

    CERN Document Server

    Moran, Alan

    2014-01-01

    This work is the definitive guide for IT managers and agile practitioners. It elucidates the principles of agile risk management and how these relate to individual projects. Explained in clear and concise terms, this synthesis of project risk management and agile techniques is illustrated using the major methodologies such as XP, Scrum and DSDM.Although the agile community frequently cites risk management, research suggests that risk is often narrowly defined and, at best, implicitly treated, which in turn leads to an inability to make informed decisions concerning risk and reward and a poor u

  18. Risk management in Takaful

    OpenAIRE

    Akhter, Waheed

    2010-01-01

    Risk management is of vital importance in Islam and Takāful provides a way to manage risks in business according to Sharī’ah principles. This research paper attempts to identify various types of risks involved in Takāful business that affect operational and investment functions of Takāful operators across the globe. It lays down criteria for Takāful operator to manage those risks effectively. However, Takāful operators often face difficulty in managing market and credit risks as Sharī’ah comp...

  19. Financial Risk Management

    OpenAIRE

    Catalin-Florinel Stanescu; Laurentiu Mircea Simion

    2011-01-01

    Concerns about the financial risk is increasing. In this climate, companies of all types and sizes want a robust framework for financial risk management to meet compliance requirements, contribute to better decision making and increase performance. Financial risk management professionals working with financial institutions and other corporate clients to achieve these objectives.

  20. 76 FR 59392 - Environmental Management Site-Specific Advisory Board, Northern New Mexico

    Science.gov (United States)

    2011-09-26

    ... Welcome and Introductions, Committee Business Items: [cir] Approve October 12, 2011, Meeting Agenda, [cir... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Northern New Mexico... meeting of the Environmental Monitoring, Surveillance and Remediation Committee and Waste Management...

  1. Development of severe accident management advisory and training simulator (SAMAT)

    International Nuclear Information System (INIS)

    Jeong, K.-S.; Kim, K.-R.; Jung, W.-D.; Ha, J.-J.

    2002-01-01

    The most operator support systems including the training simulator have been developed to assist the operator and they cover from normal operation to emergency operation. For the severe accident, the overall architecture for severe accident management is being developed in some developed countries according to the development of severe accident management guidelines which are the skeleton of severe accident management architecture. In Korea, the severe accident management guideline for KSNP was recently developed and it is expected to be a central axis of logical flow for severe accident management. There are a lot of uncertainties in the severe accident phenomena and scenarios and one of the major issues for developing a operator support system for a severe accident is the reduction of these uncertainties. In this paper, the severe accident management advisory system with training simulator, SAMAT, is developed as all available information for a severe accident are re-organized and provided to the management staff in order to reduce the uncertainties. The developed system includes the graphical display for plant and equipment status, the previous research results by knowledge-base technique, and the expected plant behavior using the severe accident training simulator. The plant model used in this paper is oriented to severe accident phenomena and thus can simulate the plant behavior for a severe accident. Therefore, the developed system may make a central role of the information source for decision-making for a severe accident management, and will be used as the training simulator for severe accident management

  2. 75 FR 20977 - Departmental Management; Advisory Committee on Minority Farmers

    Science.gov (United States)

    2010-04-22

    ...; Advisory Committee on Minority Farmers AGENCY: USDA. ACTION: Notice: Request for Nominations. SUMMARY: The Secretary of Agriculture (Secretary) establish the Advisory Committee on Minority Farmers (Committee) on... assistance to socially disadvantaged farmers and ranchers, methods of maximizing participation of minority...

  3. Value of risk management

    OpenAIRE

    Vik, Marie Amdal

    2012-01-01

    Master's thesis in Risk management The overall aim of this study was to discuss the validity of the hypothesis that risk management contributes with added value to projects and the enterprise holding the projects, and consequently to the enterprise’s stakeholders. To examine this hypothesis, a case study of three projects taken from the same portfolio at Statoil was selected. The projects were said to have an active risk management. Data was collected from the project’s documentation as...

  4. Supply Cain Risk Management

    OpenAIRE

    Goodwin, Les

    2011-01-01

    “The management of supply chain risk is crucial to any business, more so to Rolls Royce who face an almost doubling of load within the next 10 years. So what is supply chain risk management and how well is it deployed within an operational business of Rolls Royce? What are the tools and techniques available and what are the key issues around implementing world class supply chain risk management with a Supply Chain Unit within Rolls Royce?”

  5. Supply chain risk management

    OpenAIRE

    Christian Hollstein; Frank Himpel

    2013-01-01

    Background: Supply chain risk management increasingly gains prominence in many international industries. In order to strengthen supply chain structures, processes, and networks, adequate potentials for risk management need to be built (focus on effective logistics) and to be utilized (focus on efficient logistics). Natural-based disasters, such as the case of Fukushima, illustrate how crucial risk management is. Method: By aligning a theoretical-conceptual framework with empirical-induct...

  6. Exchange Risk Management Policy

    CERN Document Server

    2005-01-01

    At the Finance Committee of March 2005, following a comment by the CERN Audit Committee, the Chairman invited the Management to prepare a document on exchange risk management policy. The Finance Committee is invited to take note of this document.

  7. Identifying and Managing Risk.

    Science.gov (United States)

    Abraham, Janice M.

    1999-01-01

    The role of the college or university chief financial officer in institutional risk management is (1) to identify risk (physical, casualty, fiscal, business, reputational, workplace safety, legal liability, employment practices, general liability), (2) to develop a campus plan to reduce and control risk, (3) to transfer risk, and (4) to track and…

  8. 78 FR 26005 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-05-03

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  9. 78 FR 73519 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2013-12-06

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  10. 78 FR 45518 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2013-07-29

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  11. 78 FR 58294 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Science.gov (United States)

    2013-09-23

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National Laboratory. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  12. 78 FR 38969 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2013-06-28

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  13. 78 FR 23760 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2013-04-22

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  14. 78 FR 65979 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-11-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  15. 77 FR 50488 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2012-08-21

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  16. 78 FR 12746 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2013-02-25

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  17. 78 FR 40130 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-07-03

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  18. 78 FR 75552 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2013-12-12

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  19. 77 FR 65374 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Science.gov (United States)

    2012-10-26

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National Laboratory. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  20. 78 FR 17192 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2013-03-20

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  1. 78 FR 44942 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2013-07-25

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  2. 77 FR 31837 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2012-05-30

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  3. 78 FR 63172 - Environmental Management Site-Specific Advisory Board, Paducah; Meeting

    Science.gov (United States)

    2013-10-23

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  4. 77 FR 2713 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2012-01-19

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Hanford. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  5. 77 FR 26273 - Environmental Management Site-Specific Advisory Board, Northern New Mexico

    Science.gov (United States)

    2012-05-03

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  6. 77 FR 24695 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2012-04-25

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. . 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  7. 77 FR 55813 - Environmental Management Site-Specific Advisory Board Chairs

    Science.gov (United States)

    2012-09-11

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB) Chairs. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  8. 77 FR 47047 - Environmental Management Site-Specific Advisory Board, Northern New Mexico

    Science.gov (United States)

    2012-08-07

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  9. 78 FR 49738 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2013-08-15

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  10. 78 FR 64208 - Environmental Management Site-Specific Advisory Board Chairs

    Science.gov (United States)

    2013-10-28

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB) Chairs. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  11. 77 FR 28368 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2012-05-14

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Hanford. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  12. 77 FR 18243 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2012-03-27

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  13. 78 FR 54460 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2013-09-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  14. 77 FR 60688 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2012-10-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  15. 78 FR 17648 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2013-03-22

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  16. 77 FR 18242 - Environmental Management Site-Specific Advisory Board Chairs

    Science.gov (United States)

    2012-03-27

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB) Chairs. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  17. 78 FR 23241 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2013-04-18

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  18. 78 FR 46330 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2013-07-31

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  19. 78 FR 25064 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2013-04-29

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  20. 78 FR 38305 - Environmental Management Site-Specific Advisory Board, Northern New Mexico

    Science.gov (United States)

    2013-06-26

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  1. 78 FR 69657 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2013-11-20

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  2. 77 FR 49442 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2012-08-16

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  3. 77 FR 13104 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2012-03-05

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  4. 77 FR 53192 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Science.gov (United States)

    2012-08-31

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National Laboratory. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  5. 77 FR 39235 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2012-07-02

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  6. 77 FR 58364 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2012-09-20

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  7. 78 FR 78952 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2013-12-27

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  8. 77 FR 16021 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2012-03-19

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  9. 78 FR 16260 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2013-03-14

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  10. 77 FR 76475 - Environmental Management Site-Specific Advisory Board, Northern New Mexico

    Science.gov (United States)

    2012-12-28

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  11. 78 FR 30911 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2013-05-23

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  12. 78 FR 22255 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2013-04-15

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  13. 78 FR 716 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-01-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  14. 78 FR 32640 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2013-05-31

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  15. 77 FR 45345 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2012-07-31

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  16. 77 FR 24694 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2012-04-25

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  17. 78 FR 49739 - Environmental Management Site-Specific Advisory Board, Northern New Mexico

    Science.gov (United States)

    2013-08-15

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  18. 78 FR 10611 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2013-02-14

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  19. 78 FR 68431 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2013-11-14

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Hanford. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  20. 78 FR 54461 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-09-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  1. 77 FR 2714 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2012-01-19

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  2. 77 FR 4799 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2012-01-31

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  3. 77 FR 53193 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2012-08-31

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  4. 78 FR 7767 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2013-02-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  5. 78 FR 53135 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2013-08-28

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  6. 77 FR 49442 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2012-08-16

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  7. 77 FR 63300 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2012-10-16

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  8. 78 FR 3890 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2013-01-17

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  9. 78 FR 4139 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2013-01-18

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Hanford. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  10. 78 FR 20311 - Environmental Management Site-Specific Advisory Board Chairs

    Science.gov (United States)

    2013-04-04

    ...This notice announces a webinar of the Environmental Management Site-Specific Advisory Board (EM SSAB) Chairs. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this webinar be announced in the Federal Register.

  11. 77 FR 64112 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2012-10-18

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Hanford. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  12. 78 FR 63171 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation; Meeting

    Science.gov (United States)

    2013-10-23

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  13. 77 FR 39234 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2012-07-02

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  14. 78 FR 58292 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2013-09-23

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  15. 77 FR 74836 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Science.gov (United States)

    2012-12-18

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  16. 77 FR 22566 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2012-04-16

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  17. 78 FR 64932 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2013-10-30

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  18. 78 FR 63171 - Environmental Management Site-Specific Advisory Board, Northern New Mexico; Meeting

    Science.gov (United States)

    2013-10-23

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  19. 78 FR 28207 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2013-05-14

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Hanford. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  20. 78 FR 49738 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2013-08-15

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Hanford. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  1. 77 FR 39234 - Environmental Management Site-Specific Advisory Board, Northern New Mexico

    Science.gov (United States)

    2012-07-02

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  2. 78 FR 30910 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Science.gov (United States)

    2013-05-23

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National Laboratory. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  3. 78 FR 36543 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2013-06-18

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  4. 77 FR 16021 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2012-03-19

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Nevada. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  5. 78 FR 23759 - Environmental Management Site-Specific Advisory Board, Northern New Mexico

    Science.gov (United States)

    2013-04-22

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  6. 78 FR 59012 - Environmental Management Site-Specific Advisory Board Chairs

    Science.gov (United States)

    2013-09-25

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB) Chairs. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  7. 78 FR 56871 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2013-09-16

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Portsmouth. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  8. 77 FR 76475 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Science.gov (United States)

    2012-12-28

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National Laboratory. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  9. A Real-Time Offshore Weather Risk Advisory System

    Science.gov (United States)

    Jolivet, Samuel; Zemskyy, Pavlo; Mynampati, Kalyan; Babovic, Vladan

    2015-04-01

    Offshore oil and gas operations in South East Asia periodically face extended downtime due to unpredictable weather conditions, including squalls that are accompanied by strong winds, thunder, and heavy rains. This downtime results in financial losses. Hence, a real time weather risk advisory system is developed to provide the offshore Oil and Gas (O&G) industry specific weather warnings in support of safety and environment security. This system provides safe operating windows based on sensitivity of offshore operations to sea state. Information products for safety and security include area of squall occurrence for the next 24 hours, time before squall strike, and heavy sea state warning for the next 3, 6, 12 & 24 hours. These are predicted using radar now-cast, high resolution Numerical Weather Prediction (NWP) and Data Assimilation (DA). Radar based now-casting leverages the radar data to produce short term (up to 3 hours) predictions of severe weather events including squalls/thunderstorms. A sea state approximation is provided through developing a translational model based on these predictions to risk rank the sensitivity of operations. A high resolution Weather Research and Forecasting (WRF, an open source NWP model) is developed for offshore Brunei, Malaysia and the Philippines. This high resolution model is optimized and validated against the adaptation of temperate to tropical met-ocean parameterization. This locally specific parameters are calibrated against federated data to achieve a 24 hour forecast of high resolution Convective Available Potential Energy (CAPE). CAPE is being used as a proxy for the risk of squall occurrence. Spectral decomposition is used to blend the outputs of the now-cast and the forecast in order to assimilate near real time weather observations as an implementation of the integration of data sources. This system uses the now-cast for the first 3 hours and then the forecast prediction horizons of 3, 6, 12 & 24 hours. The output is

  10. Risk management overview

    International Nuclear Information System (INIS)

    McGovern, S.

    1995-01-01

    Launching of the first natural gas contract by the New York Mercantile Exchange (NYMEX) in April 1990 was a huge success which allowed natural gas to surpass crude oil as the most successful launch of any commodity contract. Despite this unprecedented initial success it must be kept in mind that in a competitive marketplace there are risks of many kinds (market risks, price risks, basis risks, currency risks and timing risks), that parties must deal with in everyday operations. The concept of risk management was defined, techniques and issues in risk management were explained, a glossary of fully explained industry terms, and basic financial tools most often used in risk management, were provided. 11 figs

  11. Perspectives: Intellectual Risk Management

    Science.gov (United States)

    Hall, James C.

    2013-01-01

    Ask a college administrator about students and risk management, and you're likely to get a quick and agitated speech about alcohol consumption and bad behavior or a meditation on mental health and campus safety. But in colleges and universities, we manage intellectual risk-taking too. Bring that up, and you'll probably get little out of that same…

  12. Risk Management and Simulation

    DEFF Research Database (Denmark)

    Skovmand, David

    2014-01-01

    Review of: Risk Management and Simulation / Aparna Gupta. Boca Raton, FL: CRC Press, 2013, xxix + 491 pp., $99.95(H), ISBN: 978-1-4398-3594-4.......Review of: Risk Management and Simulation / Aparna Gupta. Boca Raton, FL: CRC Press, 2013, xxix + 491 pp., $99.95(H), ISBN: 978-1-4398-3594-4....

  13. Agricultural risk management

    DEFF Research Database (Denmark)

    Lund, Mogens; Oksen, Arne; Larsen, Torben U.

    2005-01-01

    A new model for risk management in agriculture is described in the paper. The risk model is constructed as a context dependent process, which includes four main phases. The model is aimed at agricultural advisors, who wish to facilitate and disseminate risk management to farmers. It is developed...... and tested by an action research approach in an attempt to make risk management more applicable on family farms. Our obtained experiences indicate that farmers don’t apply probabilistic thinking and other concepts according to formal decision theory....

  14. The management object in risk management approaches

    OpenAIRE

    Christiansen, Ulrik

    2013-01-01

    Using a systematic review of the last 55 years of research within risk management this paper explores how risk management as a management technology (methodologies, tools and frameworks to mitigate or manage risks) singles out risks as an object for management in order to make action possible. The paper synthesise by developing a framework of how different views on risk management enable and constrain the knowledge about risk and thus frame the possibilities to measure, analyse an...

  15. Individual Property Risk Management

    Directory of Open Access Journals (Sweden)

    Michael S. Finke

    2010-01-01

    Full Text Available This paper reviews household property risk management and estimates normatively optimal choice under theoretical assumptions. Although risk retention limits are common in the financial planning industry, estimates of optimal risk retention that include both financial and human wealth far exceed limits commonly recommended. Households appear to frame property losses differently from other wealth losses leading to wealth-reducing, excess risk transfer. Possible theoretical explanations for excess sensitivity to loss are reviewed. Differences between observed and optimal risk management imply a large potential gain from improved choice.

  16. 76 FR 59142 - Joint Meeting of the Advisory Committee for Reproductive Health Drugs and the Drug Safety and...

    Science.gov (United States)

    2011-09-23

    ...] Joint Meeting of the Advisory Committee for Reproductive Health Drugs and the Drug Safety and Risk... Reproductive Health Drugs and the Drug Safety and Risk Management Advisory Committee. General Function of the...., [[Page 59143

  17. Beyond fragmentation and disconnect: networks for knowledge sharing in the English land management advisory system

    NARCIS (Netherlands)

    Klerkx, L.W.A.; Proctor, A.

    2012-01-01

    The growing multifunctionality in agriculture, combined with privatisation of previously state-funded agricultural extension services, has resulted in a pluralistic land management advisory system. Despite benefits in terms of increased client orientation and greater advisor diversity, it is argued

  18. United States of America Department of Energy Environmental Management Advisory Committee Public Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This reports contains documentation of presentations given at the United States of America Department of Energy Environmental Management Advisory Committee Public Meeting held December 14--15, 1993 in Alexandria, Virginia.

  19. Optimizing risk management

    International Nuclear Information System (INIS)

    Kindred, G.W.

    2000-01-01

    Commercial nuclear power plant management is focussed on the safe, efficient, economical production of electricity. To accomplish the safe aspect of the equation, risk must be determined for the operation and maintenance of the facility. To accomplish the efficient aspect of the equation, management must understand those risks and factor risk insights into their decision process. The final piece of the equation is economical which is accomplished by minimizing, plant outage durations and proper utilization of resources. Probabilistic Risk Assessment can provide the risk insights to accomplish all three; safety, efficiency, and economically. How? Safe production of electricity can be quantified by use of PRA modeling and other risk insights that can determine the core damage frequency. Efficient production of electricity can be influenced by providing management with quantified risk insights for use in decision making. And, one example of economical production of electricity is by not having over conservative deterministic based defense in depth approaches to system maintenance and availability. By using risk-informed insights nuclear safety can be quantified and risk can be managed. Confidence in this approach can be achieved by ensuring the content and quality of the PRA is standardized throughout the industry. The time has arrived for Probabilistic Risk Assessment to take an active position as a major role player in the safe, efficient, and economical operation of commercial nuclear power plants. (author)

  20. Internal Audit and Risk Management

    OpenAIRE

    Constantin Nicolae Vasile; Alexandru Georgiana

    2011-01-01

    Internal audit and risk management have the same goal: the control of risk. There are various roles for the internal audit in respect of risk management. The main limitations of internal audit in respect of risk management regards assuming risk management tasks. One of the main issues regarding risk management is to make sure that the key risks are taken into consideration and that the management and the board of the organization take action as needed. Internal audit could give advice to mana...

  1. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  2. Making Risk Management Strategic

    DEFF Research Database (Denmark)

    Sax, Johanna; Andersen, Torben Juul

    2018-01-01

    Enterprise risk management (ERM) is an established management practice and is increasing in prominence as more firms spend substantial resources implementing ERM frameworks, partially induced by regulatory requirements. Yet, there is a lack of knowledge as to whether such frameworks add value and...... outcomes. The study develops a new multidimensional measure of adherence to ERM practices where earlier studies typically have relied on dichotomous proxies. We discuss the implications of these findings for ERM practice and strategic management in general....

  3. Initial activities of the ITER Management Advisory Committee

    International Nuclear Information System (INIS)

    Yoshikawa, Masaji

    1994-01-01

    The first ITER Council meeting (IC-1) took place in Vienna Austria at the International Atomic Energy Agency (IAEA) headquarters on 10-11 September, 1992. At that meeting the Council appointed Dr. Masaji Yoshikawa as Chair of the Management Advisory Committee (MAC). The Parties designated the members of MAC. The first MAC meeting was held at the ITER CoCenter, Naka, Japan, on 1-3 December 1992 and reviewed its tasks as charged by the Council. In accordance with Article 7 of the ITER EDA Agreement, it is the responsibility of MAC to report to and advise the ITER Council in management and administrative matters, including finance, personnel and task assignment. Also, in accordance with Article 11 of the ITER EDA Agreement, the MAC advises the ITER Council on the Work Program developed by the Director. The Work Program is to contain a detailed list of specific tasks, including a technical description of each task, and the assignment of the specific tasks to each of the Home Teams and the Joint Central Team (JCT), and a flow chart of the specific tasks during the whole EDA. According to Section 3 of Protocol 1, the tasks are to be performed by the Home Teams; task descriptions are to contain a detailed technical description of each task and an indication of the facilities and background information needed for its implementation

  4. Governmental management of chemical risk

    International Nuclear Information System (INIS)

    Zimmerman, R.

    1990-01-01

    This book is organized under the following headings: risk management in the government context; legal and regulatory decrees and directives for managing chemical risk; incentive-based approaches for regulating risk; risk management in the federal system; and traditional approaches and new initiatives for managing chemical risk

  5. Risk management versus incentives

    International Nuclear Information System (INIS)

    Aven, E.; Lovas, K.; Osmundsen, P.

    2006-01-01

    Portfolio theory indicates that risk management should take place at the group level. Hedging at the project level or in the individual business areas may lead to suboptimal results. However, the efficiency of a profit centre depends on its management's being able to influence factors that are crucial to the unit's financial results. Price hedging could be one such factor. In the wider perspective, this constitutes part of the balancing between centralisation and decentralisation. This article covers important elements of risk management and incentive design. It goes on to discuss the balancing of overall risk management at the group level and incentive design in profit centres and corporate units. Throughout the article, the oil industry serves as a case. (author)

  6. Risk management guide

    International Nuclear Information System (INIS)

    Briscoe, G.J.

    1977-06-01

    Risk management requires an assessment or a knowledge of risk. This, in turn, requires identification of hazards (sources of risk) and a determination of risk (evaluation of the hazard degree). The hazard identification and risk analysis techniques presented in this Guide are, in general, based on the MORT concept that accidents result from unwanted energy flow in the absence of adequate controls and/or barriers. This Guide presents an analytical tree designed to prevent oversight of specific energy sources in risk identification. Hazard identification by field personnel is also discussed. Quantitative risk analysis is discussed in the following section. A method for summary of the risks for each energy classification is given. This method uses a graphical log-normal projection so that low probability events, which are not adequately represented in the experience data, are included in the risk assessment. This permits a more acceptable risk assessment since catastrophes are not ignored, even though the actual risk is only approximated. In addition, a few examples of risk analysis of specific hazards are given. Rudimentary probability and fault tree theory are used in these examples. Total risk assessment and resource allocation and safety performance trend analysis are discussed

  7. Managing Risk and Opportunity

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Garvey, Maxine; Roggi, Oliviero

    outcomes. This topic is timely and of interest both to the academic community as well as to practicing managers, executives, and directors. The volume focuses on contemporary risk leadership issues based on recent research insights but avoids excessive technical language and mathematical formulas. The book...... is framed around the challenges imposed on executives and directors in dealing with an increasingly complex and unpredictable world. This requires a new risk leadership focus that not only avoids the downside risks but also considers ways to exploit the upside potential offered by a dynamic environment....... The underlying logic is built on the principles of financial economics where benefits derive from reducing bankruptcy costs and increasing future cash inflows. This provides a stringent framework for analyzing the effect of different risk management actions and behaviors in effective risk-taking organizations...

  8. Air quality risk management.

    Science.gov (United States)

    Williams, Martin L

    2008-01-01

    Rather than attempt to provide a comprehensive account of air quality risk assessment, as might be found in a textbook or manual, this article discusses some issues that are of current importance in the United Kingdom and the rest of Europe, with special emphasis on risk assessment in the context of policy formulation, and emerging scientific knowledge. There are two pollutants of particular concern and that both pose challenges for risk assessment and policy, and they are particulate matter (PM) and ozone. The article describes some issues for health risk assessment and finally some forward-looking suggestions for future approaches to air quality management.

  9. Managing power risk

    International Nuclear Information System (INIS)

    Rudd, D.C.

    1999-01-01

    Issues regarding the management of financial risks in the electric power market were discussed. The nature of the risk was defined for electricity producers, local utilities, traders/dealers, and brokers, each of which are exposed to different types of risks with the exception of credit risk, which is common to all. The main features of options, swaps, CFDs, bilateral financial contracts, futures contracts and the terms of the NYMEX electricity contract were outlined. Basic derivative strategies, the role of the broker, the elements of emissions trading, and trading strategies for consumers were also explained. 3 fig

  10. 76 FR 81911 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Science.gov (United States)

    2011-12-29

    ...; and 7. Offer recommendations for integrating the land management planning process with landscape scale... National Forest System Land Management Planning Rule AGENCY: USDA Forest Service. ACTION: Notice of intent... Management Planning Rule (Committee). In accordance with provisions of the Federal Advisory Committee Act...

  11. Risk management frameworks for human health and environmental risks.

    Science.gov (United States)

    Jardine, Cindy; Hrudey, Steve; Shortreed, John; Craig, Lorraine; Krewski, Daniel; Furgal, Chris; McColl, Stephen

    2003-01-01

    A comprehensive analytical review of the risk assessment, risk management, and risk communication approaches currently being undertaken by key national, provincial/state, territorial, and international agencies was conducted. The information acquired for review was used to identify the differences, commonalities, strengths, and weaknesses among the various approaches, and to identify elements that should be included in an effective, current, and comprehensive approach applicable to environmental, human health and occupational health risks. More than 80 agencies, organizations, and advisory councils, encompassing more than 100 risk documents, were examined during the period from February 2000 until November 2002. An overview was made of the most important general frameworks for risk assessment, risk management, and risk communication for human health and ecological risk, and for occupational health risk. In addition, frameworks for specific applications were reviewed and summarized, including those for (1)contaminated sites; (2) northern contaminants; (3) priority substances; (4) standards development; (5) food safety; (6) medical devices; (7) prescription drug use; (8) emergency response; (9) transportation; (10) risk communication. Twelve frameworks were selected for more extensive review on the basis of representation of the areas of human health, ecological, and occupational health risk; relevance to Canadian risk management needs; representation of comprehensive and well-defined approaches; generalizability with their risk areas; representation of "state of the art" in Canada, the United States, and/or internationally; and extent of usage of potential usage within Canada. These 12 frameworks were: 1. Framework for Environmental Health Risk Management (US Presidential/Congressional Commission on Risk Assessment and Risk Management, 1997). 2. Health Risk Determination: The Challenge of Health Protection (Health and Welfare Canada, 1990). 3. Health Canada Decision

  12. Nuclear safety culture and integrated risk management

    International Nuclear Information System (INIS)

    Joksimovich, V.; Orvis, D.D.

    1993-01-01

    A primary focus of nuclear safety is the prevention of large releases of radioactivity in the case of low-probability severe accidents. An analysis of the anatomy of nuclear (Chernobyl, Three Mile Island Unit 2) and nonnuclear (Challenger, Bhopal, Piper Alpha, etc.) severe accidents yields four broad categories of root causes: human (operating crew response), machine (design with its basic flaws), media (natural phenomena, operational considerations, political environment, commercial pressures, etc.)-providing triggering events, and management (basic organizational safety culture flaws). A strong management can minimize the contributions of humans, machines, and media to the risk arising from the operation of hazardous facilities. One way that management can have a powerful positive influence is through the establishment of a proper safety culture. The term safety culture is used as defined by the International Atomic Energy Agency's International Safety Advisory Group

  13. Management of radiation risk

    International Nuclear Information System (INIS)

    Hubert, P.

    1996-01-01

    The need to control the risk from ionizing radiation can be tracked back to the eve of the twentieth century. However, as knowledge improved and practices expanded, the approaches to this control have evolved. No longer is the mere respect of some forms of exposure limits or safety related standards sufficient. Rather, it is widely admitted that there is a need for managing radiation risk, both by balancing the advantages and disadvantages of enhancing protection and by setting up a proper organization that allows handling of the risk. This paper describes the multiple aspects of radiation risk management and points out the main related issues. It critically analyzes ALARA and ICRP recommendations. 74 refs, 8 figs, 5 tabs

  14. Managing Chemical & Material Risks

    Science.gov (United States)

    2011-12-01

    Certification Program Acquisition, Technology and Logistics 9 DoD Hexavalent Chromium Risk Reduction Non- Chrome Primer II EXAVAJ ENT CHROM lrUMI...Royal Demolition eXplosive (RDX) • Cyclotrimethylenetrinitramine  Hexavalent Chromium (Cr6+) Naphthalene …pending downgrade to watch list Beryllium...T1me (secondo) 700 Acquisition, Technology and Logistics 10 Hexavalent Chromium Risk Management Actions • DoD minimization policy signed April

  15. 75 FR 3279 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2010-01-20

    ... scheduled meeting held at the Hay-Adams Hotel, 16th Street and Pennsylvania Avenue, NW., Washington, DC, on... Advisory Committee of The Securities, Industry and Financial Markets Association, was previously scheduled...

  16. Managing risk at Hanford

    International Nuclear Information System (INIS)

    Hesser, W.A.; Stillwell, W.G.; Rutherford, W.A.

    1994-01-01

    Clearly, there is sufficient motivation from Washington for the Hanford community to pay particular attention to the risks associated with the substantial volumes of radiological, hazardous, and mixed waste at Hanford. But there is also another reason for emphasizing risk: Hanford leaders have come to realize that their decisions must consider risk and risk reduction if those decisions are to be technically sound, financially affordable, and publicly acceptable. The 560-square miles of desert land is worth only a few thousand dollars an acre (if that) -- hardly enough to justify the almost two billion dollars that will be spent at Hanford this year. The benefit of cleaning up the Hanford Site is not the land but the reduction of potential risk to the public and the environment for future generations. If risk reduction is our ultimate goal, decisions about priority of effort and resource allocation must consider those risks, now and in the future. The purpose of this paper is to describe how Hanford is addressing the issues of risk assessment, risk management, and risk-based decision making and to share some of our experiences in these areas

  17. Investigation of risk management auditing

    International Nuclear Information System (INIS)

    Cao Lu

    2012-01-01

    2004, COSO published 'Enterprise Risk Management Framework', 2009, SASAC issued the 'central enterprise-wide risk management guidelines' to promote risk management within the formal state-owned enterprises in medium and large. Nuclear Group, which risk management in all branches to carry out the project homeopathic, and A Ⅱ will carry out risk management program as the first unit has accumulated more experience. This article from the perspective of internal control, based on the company's risk management practices carried out to try for the nuclear power enterprise risk management audit to describe and propose new ideas. Which expounds the significance of risk management, audit, risk management audit of the ways and means, for practical application of risk management audit of a representative summary of the issues and the ways and means to solve the problem of forward-looking recommendations. (authors)

  18. Managing Risk and Opportunity

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Garvey, Maxine; Roggi, Oliviero

    outcomes. This topic is timely and of interest both to the academic community as well as to practicing managers, executives, and directors. The volume focuses on contemporary risk leadership issues based on recent research insights but avoids excessive technical language and mathematical formulas. The book...... is framed around the challenges imposed on executives and directors in dealing with an increasingly complex and unpredictable world. This requires a new risk leadership focus that not only avoids the downside risks but also considers ways to exploit the upside potential offered by a dynamic environment...

  19. An interim report to the manager of the Paducah Gaseous Diffusion Plant from the Paducah Environmental Advisory Committee

    International Nuclear Information System (INIS)

    Jackson, G.D.

    1987-01-01

    The Paducah Environmental Advisory Committee was formed as: (1) an outgrowth of other Environmental Advisory Committees already in existence at Oak Ridge and other Martin Marietta Energy Systems plants; (2) a result of public concern following significant nuclear incidents at Bhopal and Chernobyl; (3) a result of the new direction and commitment of the management of the Paducah Gaseous Diffusion Plant following contract acquisition by Martin Marietta Energy Systems; and (4) a means of reducing and/or preventing local and/or public concern regarding the activities of and potential risks created by PGDP. This report discusses the following issues and concerns of the Committee arrived at through a series of meetings: (1) groundwater monitoring; (2) long-range tails storage; C-404, scrap yrads, and PCB and TCE cleanup; nuclear criticality plan and alarm systems; documentation of historical data regarding hazardous waste burial grounds; dosimeter badges; and asbestos handling and removal

  20. An interim report to the manager of the Paducah Gaseous Diffusion Plant from the Paducah Environmental Advisory Committee

    International Nuclear Information System (INIS)

    Jackson, G.D.

    1987-10-01

    The Paducah Environmental Advisory Committee was formed as: (1) an outgrowth of other Environmental Advisory Committees already in existence at Oak Ridge and other Martin Marietta Energy Systems plants; (2) a result of public concern following significant nuclear incidents at Bhopal and Chernobyl; (3) a result of the new direction and commitment of the management of the Paducah Gaseous Diffusion Plant following contract acquisition by Martin Marietta Energy Systems; and (4) a means of reducing and/or preventing local and/or public concern regarding the activities of and potential risks created by PGDP. This report discusses the following issues and concerns of the Committee arrived at through a series of meetings: (1) groundwater monitoring; (2) long-range tails storage; C-404, scrap yrads, and PCB and TCE cleanup; nuclear criticality plan and alarm systems; documentation of historical data regarding hazardous waste burial grounds; dosimeter badges; and asbestos handling and removal

  1. Risk management in customs control

    OpenAIRE

    Drobot, Elena; Klevleeva, Aziza

    2016-01-01

    The particularities of risk-management system implementation within customs control are discussed in the article. The authors single out the elements of risk-management system, evaluate effectiveness of risk-management in customs control. The main reasons for non-implementation of risk-management system in customs control are described, as well. Particular attention is paid to the benefits of customs risk management.

  2. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  3. The Management Object in Risk Management Approaches

    DEFF Research Database (Denmark)

    Christiansen, Ulrik

    Using a systematic review of the last 55 years of research within risk management this paper explores how risk management as a management technology (methodologies, tools and frameworks to mitigate or manage risks) singles out risks as an object for management in order to make action possible....... The paper synthesise by developing a framework of how different views on risk management enable and constrain the knowledge about risk and thus frame the possibilities to measure, analyse and calculate uncertainty and risk. Inspired by social studies of finance and accounting, the paper finally develops...... three propositions that illustrate how the framing of risk establishes a boundary for how managers might understand value creation and the possible future and how this impacts the possible responses to risk....

  4. Continuous Risk Management: An Overview

    Science.gov (United States)

    Rosenberg, Linda; Hammer, Theodore F.

    1999-01-01

    Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  5. Information Risk Management and Resilience

    Science.gov (United States)

    Dynes, Scott

    Are the levels of information risk management efforts within and between firms correlated with the resilience of the firms to information disruptions? This paper examines the question by considering the results of field studies of information risk management practices at organizations and in supply chains. The organizations investigated differ greatly in the degree of coupling from a general and information risk management standpoint, as well as in the levels of internal awareness and activity regarding information risk management. The comparison of the levels of information risk management in the firms and their actual or inferred resilience indicates that a formal information risk management approach is not necessary for resilience in certain sectors.

  6. Nuclear risk management

    International Nuclear Information System (INIS)

    2001-01-01

    This paper gives the list of contributions to Eurosafe 2001 which was organised around two round tables on the first day and five seminars on the second day. The first round table dealt with the technical, organisational and societal aspects of risk management aimed at the prevention of accidents in nuclear power plants. The second round table focused on radiological risks from the normal operation of nuclear installations. Special consideration has been given to the involvement of stakeholders. The five seminars were held in order to provide opportunities for comparing experiences and learning about recent activities of IRSN, GRS and their partners in the European Union and Eastern Europe: - Safety assessment and analysis of nuclear installations; -Nuclear safety research; -Environment and radiation protection; - Waste management; - Nuclear material security. (author)

  7. Nuclear risk management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This paper gives the list of contributions to Eurosafe 2001 which was organised around two round tables on the first day and five seminars on the second day. The first round table dealt with the technical, organisational and societal aspects of risk management aimed at the prevention of accidents in nuclear power plants. The second round table focused on radiological risks from the normal operation of nuclear installations. Special consideration has been given to the involvement of stakeholders. The five seminars were held in order to provide opportunities for comparing experiences and learning about recent activities of IRSN, GRS and their partners in the European Union and Eastern Europe: - Safety assessment and analysis of nuclear installations; -Nuclear safety research; -Environment and radiation protection; - Waste management; - Nuclear material security. (author)

  8. Credit risk management in banks

    OpenAIRE

    Pětníková, Tereza

    2014-01-01

    The subject of this diploma thesis is managing credit risk in banks, as the most significant risk faced by banks. The aim of this work is to define the basic techniques, tools and methods that are used by banks to manage credit risk. The first part of this work focuses on defining these procedures and describes the entire process of credit risk management, from the definition of credit risk, describing credit strategy and policy, organizational structure, defining the most used credit risk mi...

  9. Current Chemical Risk Management Activities

    Science.gov (United States)

    EPA's existing chemicals programs address pollution prevention, risk assessment, hazard and exposure assessment and/or characterization, and risk management for chemicals substances in commercial use.

  10. Managing Complex Environmental Risks

    Energy Technology Data Exchange (ETDEWEB)

    Karlsson, Mikael [Karlstad Univ. (Sweden). Dept. of Environmental Sciences

    2006-09-15

    Environmental and public health risks are often handled in a process in which experts, and sometimes policy makers, try their best to quantitatively assess, evaluate and manage risks. This approach harmonises with mainstream interpretations of sustainable development, which aim at defining a desirable relationship between human and natural systems, for instance by policies that define limit values of different forms of disturbances. However, under conditions of high scientific incertitude, diverging values and distrust, this approach is far from satisfactory. The use of cell phones, hazardous chemicals, nuclear or fossil energy systems, and modern biotechnology are examples of activities causing such risks with high complexity. Against this background, a complementary interpretation of the concept of sustainable development is suggested. This interpretation is operationalised through new formulations of three common principles for public risk management; the precautionary principle, the polluter pays principle and the principle of public participation. Implementation of these reformulated principles would challenge some foundations of present mainstream views on environmental decision-making, but would on the other hand contribute to improved practices for long-term human welfare and planetary survival (full text of contribution)

  11. Managing Complex Environmental Risks

    International Nuclear Information System (INIS)

    Karlsson, Mikael

    2006-01-01

    Environmental and public health risks are often handled in a process in which experts, and sometimes policy makers, try their best to quantitatively assess, evaluate and manage risks. This approach harmonises with mainstream interpretations of sustainable development, which aim at defining a desirable relationship between human and natural systems, for instance by policies that define limit values of different forms of disturbances. However, under conditions of high scientific incertitude, diverging values and distrust, this approach is far from satisfactory. The use of cell phones, hazardous chemicals, nuclear or fossil energy systems, and modern biotechnology are examples of activities causing such risks with high complexity. Against this background, a complementary interpretation of the concept of sustainable development is suggested. This interpretation is operationalised through new formulations of three common principles for public risk management; the precautionary principle, the polluter pays principle and the principle of public participation. Implementation of these reformulated principles would challenge some foundations of present mainstream views on environmental decision-making, but would on the other hand contribute to improved practices for long-term human welfare and planetary survival (full text of contribution)

  12. Phase I Recommendations by the Air Quality Management Work Group to the Clean Air Act Advisory Committee

    Science.gov (United States)

    Recommendations to the Clean Air Act Advisory Committee by Air Quality Management Work Group addressing the recommendations made by the National Research Council to improve the U.S. air quality management system.

  13. CEA - 2014 risk management assessment

    International Nuclear Information System (INIS)

    Bonnevie, Edwige; Verwaerde, Daniel; Maillot, Bernard

    2015-06-01

    After introducing presentations of CEA managers in charge of risk management and controls, this document presents and comments the actions undertaken by the CEA and the obtained results in terms of risk management in different fields: protection and control of the environment, installation safety, health, safety and radiation protection, transport of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of legal risks, internal audits and controls. Other topics are addressed like the presentation of the risk management department, and the role of the CEA in the relationship between research and industry

  14. CEA: risk management assessment 2011

    International Nuclear Information System (INIS)

    Bigot, Bernard; Bonnevie, Edwige; Maillot, Bernard

    2012-01-01

    This report proposes a qualitative and quantitative overview of CEA activities in the field of risk management during 2011. These activities concerned the impact on the environment, the safety of installations, the management of professional risks (safety and health at work), the radiological protection of workers, the transports of hazardous materials, waste management, protection of sites, installations and heritage, the management of emergency situations, the management of law risks, controls and audits

  15. United States Department of Energy Environmental Management Advisory Board: Public meeting

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-15

    This meeting of the Environmental Management Advisory Board was held to discuss environmental concerns that everybody has and to provide a strategy for dealing with the problems. Plans for the Environmental Management Programmatic Environmental Impact Statement are presented. A report is included of the subcommittee on institutional barriers to advanced technology use. The subcommittee on environmental restoration cost effectiveness also presents a report. The status of public involvement activities is evaluated. A presentation on the status of spent fuel management is included.

  16. Risk Management in Cocurricular Activities.

    Science.gov (United States)

    Webb, Edward M.

    1988-01-01

    Discusses risk management for colleges' cocurricular activities. Discusses tort liability, contributory negligence, and assumption of risk. Provides six concrete steps for managing risks responsibly and professionally: adopting an educational mission statement, assigning risk to others, establishing safety standards, training club advisors,…

  17. Managing Corruption Risks

    DEFF Research Database (Denmark)

    Krause Hansen, Hans

    2011-01-01

    This article investigates the emerging engagement of private actors and specifically Western corporations in international anti-corruption, drawing on Foucauldian studies of governmentality. It explores this engagement as governing practices that have emanated quite independently from the inter......-state system commonly understood to be at the core of the anti-corruption regime. It demonstrates how corporate anti-corruption ties in with a relatively new way of perceiving corruption. In this framing, anti-corruption comes out as risk management, which is latched on to notions of corporate social...... responsibility and business ethics. Moreover, the constitution of corruption risk relates to the rise of new actors and networks engaged in a wider business of anti-corruption, including commercial and hybrid actors that supply corporations with managerial instruments, benchmarks for best practice, rankings...

  18. INTERNAL AUDIT AND RISK MANAGEMENT

    OpenAIRE

    Elena RUSE; Georgiana SUSMANSCHI (BADEA); Daniel DĂNECI-PĂTRĂU

    2014-01-01

    The existence of risk in economic activity can not be denied. In fact, the risk is a concept which exists in every activity, the term of risk being identified with uncertainty, respectively the (un)chance to produce an undesirable event. Internal audit and risk management aim at the same goal, namely the control of risks. Internal Audit performs several roles in risk management plan. The objectives of the internal audit function varies from company to company, but in all economic entities int...

  19. 75 FR 64718 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2010-10-20

    ... Test Site including decontamination, closure, re-use and/or demolition. Purpose of the Soils Committee: The purpose of the Committee is to focus on issues related to soil contamination at the Nevada Test... Industrial Sites and Soils Committees of the Environmental Management Site-Specific Advisory Board (EM SSAB...

  20. 76 FR 5365 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2011-01-31

    ... Industrial Sites and Soils Committees of the Environmental Management Site-Specific Advisory Board (EM SSAB... sites at the Nevada National Security Site including decontamination, closure, re-use and/or demolition. Purpose of the Soils Committee: The purpose of the Committee is to focus on issues related to soil...

  1. 75 FR 71677 - Environmental Management Site-Specific Advisory Board, Nevada

    Science.gov (United States)

    2010-11-24

    ... Industrial Sites and Soils Committees of the Environmental Management Site-Specific Advisory Board (EM SSAB... sites at the Nevada Test Site including decontamination, closure, re-use and/or demolition. Purpose of the Soils Committee: The purpose of the Committee is to focus on issues related to soil contamination...

  2. 78 FR 61348 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Science.gov (United States)

    2013-10-03

    ...On September 16, 2013, in FR Doc. 2013-22453, on page 56871, the Department of Energy (DOE) published a notice of open meeting announcing a meeting on October 2, 2013 of the Environmental Management Site-Specific Advisory Board, Portsmouth (78 FR 56871). This notice announces the cancellation of this meeting.

  3. 78 FR 16260 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-03-14

    ...On March 4, 2013, the Department of Energy (DOE) published a notice of open meeting announcing a meeting on March 25-26, 2013 of the Environmental Management Site-Specific Advisory Board, Savannah River Site (78 FR 14088). This document makes a correction to that notice.

  4. 78 FR 26635 - Environmental Management Site-Specific Advisory Board, Paducah

    Science.gov (United States)

    2013-05-07

    ...On April 29, 2013, the Department of Energy (DOE) published a notice of open meeting announcing a meeting on May 16, 2013 of the Environmental Management Site-Specific Advisory Board, Paducah (78 FR 25064). This document makes a correction to that notice.

  5. 76 FR 28218 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2011-05-16

    ...: Red Lion Hotel, 1101 North Columbia Center Boulevard, Kennewick, WA 99336. FOR FURTHER INFORMATION... Committee; Health, Safety and Environmental Protection Committee; Public Involvement Committee; and Budgets... Priorities. [cir] Hanford Advisory Board Budget. [cir] Process Discussions: [dec222] Issue Managers. [dec222...

  6. 77 FR 472 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Science.gov (United States)

    2012-01-05

    ... DEPARTMENT OF AGRICULTURE Forest Service National Advisory Committee for Implementation of the National Forest System Land Management Planning Rule; Correction AGENCY: USDA Forest Service. ACTION... for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1 (800) 877-8339 between 8...

  7. Managing Climate Change Risks

    Energy Technology Data Exchange (ETDEWEB)

    Jones, R. [CSIRO Atmospheric Research, PMB1 Aspendale, Victoria 3195 (Australia)

    2003-07-01

    Issues of uncertainty, scale and delay between action and response mean that 'dangerous' climate change is best managed within a risk assessment framework that evolves as new information is gathered. Risk can be broadly defined as the combination of likelihood and consequence; the latter measured as vulnerability to greenhouse-induced climate change. The most robust way to assess climate change damages in a probabilistic framework is as the likelihood of critical threshold exceedance. Because vulnerability is dominated by local factors, global vulnerability is the aggregation of many local impacts being forced beyond their coping ranges. Several case studies, generic sea level rise and temperature, coral bleaching on the Great Barrier Reef and water supply in an Australian catchment, are used to show how local risk assessments can be assessed then expressed as a function of global warming. Impacts treated thus can be aggregated to assess global risks consistent with Article 2 of the UNFCCC. A 'proof of concept' example is then used to show how the stabilisation of greenhouse gases can constrain the likelihood of exceeding critical thresholds at both the both local and global scale. This analysis suggests that even if the costs of reducing greenhouse gas emissions and the benefits of avoiding climate damages can be estimated, the likelihood of being able to meet a cost-benefit target is limited by both physical and socio-economic uncertainties. In terms of managing climate change risks, adaptation will be most effective at reducing vulnerability likely to occur at low levels of warming. Successive efforts to mitigate greenhouse gases will reduce the likelihood of reaching levels of global warming from the top down, with the highest potential temperatures being avoided first, irrespective of contributing scientific uncertainties. This implies that the first cuts in emissions will always produce the largest economic benefits in terms of avoided

  8. Communicating Risk to Program Managers

    Science.gov (United States)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  9. Managing information technology security risk

    Science.gov (United States)

    Gilliam, David

    2003-01-01

    Information Technology (IT) Security Risk Management is a critical task for the organization to protect against the loss of confidentiality, integrity and availability of IT resources. As systems bgecome more complex and diverse and and attacks from intrusions and malicious content increase, it is becoming increasingly difficult to manage IT security risk. This paper describes a two-pronged approach in addressing IT security risk and risk management in the organization: 1) an institutional enterprise appraoch, and 2) a project life cycle approach.

  10. Credit derivatives and risk management

    OpenAIRE

    Michael S. Gibson

    2007-01-01

    The striking growth of credit derivatives suggests that market participants find them to be useful tools for risk management. I illustrate the value of credit derivatives with three examples. A commercial bank can use credit derivatives to manage the risk of its loan portfolio. An investment bank can use credit derivatives to manage the risks it incurs when underwriting securities. An investor, such as an insurance company, asset manager, or hedge fund, can use credit derivatives to align its...

  11. The Key to Risk Management: Management

    OpenAIRE

    Adrian E. Tschoegl

    2000-01-01

    The Barings, Daiwa Bank and Sumitomo Corp. financial debacles in the mid-1990s suggest that management failures rather than misfortune, errors, or complexity are a major source of the risk of financial debacles. These errors are systematic and are a concommittant of the structure of trading and of human nature. Risk management systems must take these facts into account.

  12. Risk Management in Insurance Companies

    OpenAIRE

    Yang, Xufeng

    2006-01-01

    Insurance is the uncertain business in uncertain society. Today, insures face more complex and difficult risks. Efficient risk management mechanisms are essential for the insurers. The paper is set out initially to explore UK insurance companies risk management and risk disclosure by examining companies annual report after all the listed insurance companies are required to disclose risk information in their annual report, which seeks to reflect the recent development in UK insurance companies...

  13. Information systems for risk management

    OpenAIRE

    Michael S. Gibson

    1997-01-01

    Risk management information systems are designed to overcome the problem of aggregating data across diverse trading units. The design of an information system depends on the risk measurement methodology that a firm chooses. Inherent in the design of both a risk management information system and a risk measurement methodology is a tradeoff between the accuracy of the resulting measures of risk and the burden of computing them. Technical progress will make this tradeoff more favorable over time...

  14. Framework for systematic risk management

    International Nuclear Information System (INIS)

    Knief, R.A.; Mahn, J.A.; Briant, V.S.; Lee, R.B.; Long, R.L.

    1991-01-01

    The first paper of the Symposium described GPU Nuclear's Risk Management Group (RMG) and the use of literature search and interviews in a extensive study of risk management. One of the most important goals of the study was to identify comprehensive approaches to managing risk in the nuclear and major high-technology industries. This paper discusses RMG's multi-step generic risk-management process consisting of the following steps to: identify hazards; screen hazards and identify preventive actions, including costs; evaluate hazards for severity, probable frequency, and cost of preventive actions; prioritize preventive actions (preference to high risk and low cost); implement preventive actions; monitor and provide feedback

  15. Trends in risk management in nuclear industry

    International Nuclear Information System (INIS)

    Kim, Inn Seock

    1996-01-01

    Safety management may be classified into three dimensions: risk management, accident management, and emergency management. This paper addresses the recent trends of safety management in nuclear industry, focussing on risk management and accident management

  16. Risk assessment and risk management in managed aquifer recharge

    CSIR Research Space (South Africa)

    Page, D

    2012-06-01

    Full Text Available This chapter presents the methodologies used for risk assessment and risk management in MAR in Australia and the European Union, qualitative and quantitative approaches adopted within the RECLAIM Water project and case studies where the outcomes...

  17. Understanding and managing risk attitude

    National Research Council Canada - National Science Library

    Hillson, David; Murray-Webster, Ruth

    2007-01-01

    ... This book highlights how risk attitude factors influence the human psyche, and carefully explains the impacts. Organisations seeking to dramatically improve the effectiveness of their risk management process will want to use this book's insights. Craig Peterson, President, PMI Risk Management SIG This book has prompted me to think more deeply as a change d...

  18. Methods of Financial Risk Management

    Directory of Open Access Journals (Sweden)

    Korzh Natalia

    2016-10-01

    Full Text Available The essence and nature of financial risks are investigated. Their classification is conducted. The features of financial risk management and the main methods of management are considered. The ways of risk compensation are identified. It is proved that the objective external risk basis is such market imperfections as externalities of enterprises and incomplete information about the operation of the business environment and internal objective basis risk – the objective function to maximise profits in a competitive environment. It is revealed that to compensate market imperfections business entities should develop a strategy that combines fill in missing information and neutralise or minimise externalities that tactically implemented in financial risk management programs.

  19. IMPLEMENTING A RISK MANAGEMENT STANDARD

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2013-01-01

    Full Text Available After risk management “conquered” more and more project managers’ minds and showed its benefits for business and programs, the need to have a global risk management standard has become a crucial issue in the world of risk management. But having a global risk management standard has been a big challenge, starting from the decision of developing the standard (March-June 2005, to the moment of publishing it, November 2009. So, developing the ISO 31000:2009 standard has been more or less like a bumpy ride. Apparently, the people involved in developing the global risk management standard understood from the very beginning that no challenges are too big, nor any tasks too small and that the task of having a new, comprehensive global risk management standard should be completed with excellence: defining the principles and the framework guiding the risk management process applicable for all type of organizations and for a wide range of activities. Coming up with a global standard should always be based on the real organizations’ needs and should fulfill real risk management requirements. The article is trying to present the pros and cons of risk management standard implementation, challenging the implementation process itself and the added value of implementing the standard due to the lack of implementation enablers, like risk culture, a real problem especially in an international environment.

  20. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  1. Innovations in Quantitative Risk Management

    CERN Document Server

    Scherer, Matthias; Zagst, Rudi

    2015-01-01

    Quantitative models are omnipresent –but often controversially discussed– in todays risk management practice. New regulations, innovative financial products, and advances in valuation techniques provide a continuous flow of challenging problems for financial engineers and risk managers alike. Designing a sound stochastic model requires finding a careful balance between parsimonious model assumptions, mathematical viability, and interpretability of the output. Moreover, data requirements and the end-user training are to be considered as well. The KPMG Center of Excellence in Risk Management conference Risk Management Reloaded and this proceedings volume contribute to bridging the gap between academia –providing methodological advances– and practice –having a firm understanding of the economic conditions in which a given model is used. Discussed fields of application range from asset management, credit risk, and energy to risk management issues in insurance. Methodologically, dependence modeling...

  2. RISK MANAGEMENT IN CUSTOMS CONTROL

    Directory of Open Access Journals (Sweden)

    Elena Valerievna Drobot

    2017-06-01

    Full Text Available Customs administrations operating in the modern global economy are faced with a complex range of challenges. The prime responsibilities remain the collection of revenues and the protection of the society, but these demanding tasks must be performed effectively and efficiently, whilst at the same time facilitating the flow of legitimate goods. Risk management is a logical and systematic method of identifying, analyzing and managing risks. Risk management can be associated with any activity, function or process within the organization and will enable the organization to take advantage of opportunities and minimize potential losses. Minimization of the human factor in customs control through the implementation of non-intrusive inspection equipment can be very useful. The particularities of risk-management system (RMS implementation within customs control are discussed in the article. The authors single out the elements of the risk-management system, evaluate the effectiveness of risk-management in customs control. The main reasons for non-implementation of the risk-management system in customs control are described as well. The particular attention is paid to the benefits of customs risk management. The authors’ hypothesis is that risk management in customs control must find a balance between costs and benefits to address all risks equally. Criteria are needed to decide what constitutes an acceptable or unacceptable risk. Thus, system analysis and risk management system are the effective mechanisms for acceleration of customs clearance and improve the quality of customs control. As a conclusion, the authors give recommendations for the improvement of the effectiveness of risk management system in customs control.

  3. Report: EPA Has Adequate Controls to Manage Advice From Science and Research Federal Advisory Committees, but Transparency Could Be Improved

    Science.gov (United States)

    Report #17-P-0124, March 13, 2017. Science plays an integral role in the EPA's mission. The EPA has an adequate system of controls to manage recommendations from its science and research federal advisory committees.

  4. Risk management and corporate value

    Directory of Open Access Journals (Sweden)

    Milan Cupic

    2015-12-01

    Full Text Available The paper presents a theoretical framework for assessing the impact of risk management on corporate value. As the relevant factors that determine this impact, the paper analyzes market imperfections and investors’ risk aversion. The results of the present research indicate that risk management contributes to an increase in corporate value if, under the influence of market imperfections, corporate risk exposure is concave. As an expression of market imperfections, the paper analyzes the costs of financial distress, agency costs, and taxation. The results of the research also indicate that the risk management policy should not aim to minimize, but rather optimize risk exposure, by taking into account the costs of risk management, investors’ risk aversion and the competitive advantage a corporation has on the relevant market.

  5. Risk management of precious metals

    NARCIS (Netherlands)

    S.M. Hammoudeh (Shawkat); F. Malik (Farooq); M.J. McAleer (Michael)

    2010-01-01

    textabstractThis paper examines volatility and correlation dynamics in price returns of gold, silver, platinum and palladium, and explores the corresponding risk management implications for market risk and hedging. Value-at-Risk (VaR) is used to analyze the downside market risk associated with

  6. Risk Management in Logystics Chains

    OpenAIRE

    Butrin, Andrey; Vikulov, Vladimir

    2013-01-01

    Article is devoted to risk management of supply chain. The authors considered indicators of supply chain risks, including risks caused by supplier. Authors formed a method of optimizing the level of supply chain risk in the integration with suppliers and customers.

  7. Improving Information Security Risk Management

    Science.gov (United States)

    Singh, Anand

    2009-01-01

    manaOptimizing risk to information to protect the enterprise as well as to satisfy government and industry mandates is a core function of most information security departments. Risk management is the discipline that is focused on assessing, mitigating, monitoring and optimizing risks to information. Risk assessments and analyses are critical…

  8. RISKS MANAGEMENT: NEW LITERATURE REVIEW

    OpenAIRE

    Ennouri Wissem

    2013-01-01

    The complexity of the industrial activities and the important mass of flows crossing the supply chain promotes the emergence of risks that must be considered in the decision process. For this reason, we have developed this paper to clarify the basics of risk management through a short new suggestion of literature review for risk management. Our justification of this attempt is that this area is the most discussed in our days and it is impossible to present all definition of the risk concept, ...

  9. Integrated supply chain risk management

    OpenAIRE

    Riaan Bredell; Jackie Walters

    2007-01-01

    Integrated supply chain risk management (ISCRM) has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly ...

  10. Managing the risks of risk management on large fires

    Science.gov (United States)

    Donald G. MacGregor; Armando González-Cabán

    2013-01-01

    Large fires pose risks to a number of important values, including the ecology, property and the lives of incident responders. A relatively unstudied aspect of fire management is the risks to which incident managers are exposed due to organizational and sociopolitical factors that put them in a position of, for example, potential liability or degradation of their image...

  11. The Uncertainties of Risk Management

    DEFF Research Database (Denmark)

    Vinnari, Eija; Skærbæk, Peter

    2014-01-01

    for expanding risk management. More generally, such uncertainties relate to the professional identities and responsibilities of operational managers as defined by the framing devices. Originality/value – The paper offers three contributions to the extant literature: first, it shows how risk management itself......Purpose – The purpose of this paper is to analyse the implementation of risk management as a tool for internal audit activities, focusing on unexpected effects or uncertainties generated during its application. Design/methodology/approach – Public and confidential documents as well as semi......-structured interviews are analysed through the lens of actor-network theory to identify the effects of risk management devices in a Finnish municipality. Findings – The authors found that risk management, rather than reducing uncertainty, itself created unexpected uncertainties that would otherwise not have emerged...

  12. Continuous Risk Management at NASA

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.

  13. DEFENSE PROGRAMS RISK MANAGEMENT FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2012-01-01

    Full Text Available For the past years defense programs have faced delays in delivering defense capabilities and budget overruns. Stakeholders are looking for ways to improve program management and the decision making process given the very fluid and uncertain economic and political environment. Consequently, they have increasingly resorted to risk management as the main management tool for achieving defense programs objectives and for delivering the defense capabilities strongly needed for the soldiers on the ground on time and within limited defense budgets. Following a risk management based decision-making approach the stakeholders are expected not only to protect program objectives against a wide range of risks but, at the same time, to take advantage of the opportunities to increase the likelihood of program success. The prerequisite for making risk management the main tool for achieving defense programs objectives is the design and implementation of a strong risk management framework as a foundation providing an efficient and effective application of the best risk management practices. The aim of this paper is to examine the risk management framework for defense programs based on the ISO 31000:2009 standard, best risk management practices and the defense programs’ needs and particularities. For the purposes of this article, the term of defense programs refers to joint defense programs.

  14. The Radioactive Waste Management Advisory Committee's report on radioactive waste management practices in Switzerland

    International Nuclear Information System (INIS)

    1998-01-01

    Radioactive Waste Management Advisory Committee (RWMAC) is the independent body that advises the Secretary of State for the Environment, Transport and the Regions and the Secretaries of State for Scotland and for Wales on issues relating to radioactive waste management. The terms of reference of the RWMAC, and a list of its Members, are given in Annex 1 to this Report. A group of 16 RWMAC Members examined the management of radioactive waste in Switzerland during a study visit to that country made between 8 and 12 October 1996. The aim of the visit was to acquire first hand knowledge of a set of practices adopted outside the United Kingdom by visiting radioactive waste management facilities and holding discussions with those involved, whether as operators, regulators or advisors to Government. This Report describes what the group saw, records the information collected, and sets out its findings. Switzerland's political system, with the emphasis placed on referenda, encourages popular participation in the democratic process. This may appear to have slowed down the provision of management facilities for radioactive wastes. From a longer term perspective, however, it is clear that such facilities may only really be viable in locations where there is sufficient local support. The quality of the arguments, from both supporters and opponents of nuclear power, is clear evidence of the importance which needs to be attached to the views of those affected. In order to build on what has already been achieved, notably in storage and research, those concerned with radioactive waste management in Switzerland continue to recognise this underlying principle

  15. 78 FR 30305 - The President's Management Advisory Board (PMAB); Public Advisory Meeting

    Science.gov (United States)

    2013-05-22

    ... strategies for the implementation of best business practices to improve Federal Government management and... for 2013 which include Management Innovation and Optimizing Federal Real Estate. In addition, the PMAB... offices at GSA, Washington, DC 20006, on official business days between the hours of 10 a.m. and 5 p.m...

  16. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    OpenAIRE

    Szabo Alina

    2012-01-01

    Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in ...

  17. NGNP Risk Management Database: A Model for Managing Risk

    International Nuclear Information System (INIS)

    Collins, John

    2009-01-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft(reg s ign) Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool's design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  18. NGNP Risk Management Database: A Model for Managing Risk

    Energy Technology Data Exchange (ETDEWEB)

    John Collins

    2009-09-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft® Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool’s design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  19. IRRIMET: a web 2.0 advisory service for irrigation water management

    Science.gov (United States)

    De Michele, Carlo; Anzano, Enrico; Colandrea, Marco; Marotta, Luigi; Mula, Ileana; Pelosi, Anna; D'Urso, Guido; Battista Chirico, Giovanni

    2016-04-01

    Irrigation agriculture is one the biggest consumer of water in Europe, especially in southern regions, where it accounts for up to 70% of the total water consumption. The EU Common Agricultural Policy, combined with the Water Framework Directive, imposes to farmers and irrigation managers a substantial increase of the efficiency in the use of water in agriculture for the next decade. Irrigating according to reliable crop water requirement estimates is one of the most convincing solution to decrease agricultural water use. Here we present an innovative irrigation advisory service, applied in Campania region (Southern Italy), where a satellite assisted irrigation advisory service has been operating since 2006. The advisory service is based on the optimal combination of VIS-NIR high resolution satellite images (Landsat, Deimos, Rapideye) to map crop vigour, and high resolution numerical weather prediction for assessing the meteorological variables driving the crop water needs in the short-medium range. The advisory service is broadcasted with a simple and intuitive web app interface which makes daily real time irrigation and evapotranspiration maps and customized weather forecasts (based on Cosmo Leps model) accessible from desktop computers, tablets and smartphones.

  20. 75 FR 56548 - Joint Meeting of the Peripheral and Central Nervous System Drugs Advisory Committee and the Drug...

    Science.gov (United States)

    2010-09-16

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-N-0001] Joint Meeting of the Peripheral and Central Nervous System Drugs Advisory Committee and the Drug Safety... and Central Nervous System Drugs Advisory Committee and the Drug Safety and Risk Management Advisory...

  1. Selecting Copulas for Risk Management

    NARCIS (Netherlands)

    H.J.W.G. Kole (Erik); C.G. Koedijk (Kees); M.J.C.M. Verbeek (Marno)

    2006-01-01

    textabstractCopulas offer financial risk managers a powerful tool to model the dependence between the different elements of a portfolio and are preferable to the traditional, correlation-based approach. In this paper we show the importance of selecting an accurate copula for risk management. We

  2. Corporate risk management : an overview

    NARCIS (Netherlands)

    Oosterhof, Casper M.

    2001-01-01

    Corporate risk management and hedging are important activities within financial as well as non-financial corporations. Under the assumptions of Modigliani and Miller [1958], corporate risk management is a redundant activity. However, the existence of market imperfections can explain the corporate

  3. US DoE's Environmental Management Site-Specific Advisory Board 15 Years of Community Involvement

    International Nuclear Information System (INIS)

    Nielson, M.; Brennan, C.A.

    2009-01-01

    This paper provides an overview of the U.S. Department of Energy's Environmental Management Site-Specific Advisory Board (EM SSAB) from its roots in the early 1990's at the Keystone Center to its current activities. The EM SSAB has a unique mandate to provide input regarding the cleanup of nuclear legacy sites in the United States. Chartered under the Federal Advisory Committee Act, the EM SSAB today comprises eight local boards. The Office of Environmental Management has made public participation a fundamental component of its cleanup mission and has found that the EM SSAB has contributed greatly to bringing community values and priorities to the cleanup decision-making processes. Public participation that involves ongoing community engagement has inherent challenges; the EM SSAB has additional challenges that reflect the political and technical nature of the Agency's work. (authors)

  4. Updated recommendations for managing the care of patients receiving oral bisphosphonate therapy: an advisory statement from the American Dental Association Council on Scientific Affairs.

    Science.gov (United States)

    Edwards, Beatrice J; Hellstein, John W; Jacobsen, Peter L; Kaltman, Steven; Mariotti, Angelo; Migliorati, Cesar A

    2008-12-01

    and Overview. In 2005, the American Dental Association (ADA) Council on Scientific Affairs convened an expert panel to develop clinical recommendations for dentists treating patients who are receiving oral bisphosphonate therapy. The Journal of the American Dental Association published the resulting report in 2006. This 2008 advisory statement is the first of projected periodic updates of the 2006 clinical recommendations. This 2008 advisory statement concludes, on the basis of a review of the current literature, that for patients receiving bisphosphonate therapy, the risk of developing bisphosphonate-associated osteonecrosis (BON) of the jaw apparently remains low. It also newly concludes that current screening and diagnostic tests are unreliable for predicting a patient's risk of developing the condition. This statement updates the 2006 recommendations regarding general dentistry, management of periodontal diseases, implant placement and maintenance, oral and maxillofacial surgery, endodontics, restorative dentistry and prosthodontics, and orthodontics.

  5. Fish advisories in the USA and Japan: risk communication and public awareness of a common idea with different backgrounds.

    Science.gov (United States)

    Ser, Ping Han; Watanabe, Chiho

    2012-01-01

    Some countries have established fish advisories to manage fish consumption to minimize methylmercury exposure. Our objective was to compare the fish advisories and the resultant consumer behavior in the United States of America (USA) and Japan. Both countries have national consumption guidelines, but American states enjoy greater independence in issuing guidelines for local water bodies and vary in the information that is provided for the public. The proportion of the American public that has heard of state fish advisories is thought to be close to 30%. There is a concern that this low level of awareness extends to pregnant women. In Japan, the current problem is the lack of comprehensive studies on the public awareness of fish advisories. Nonetheless, there is evidence that fish consumption has decreased in both countries. In USA, there is a possibility that the strong emphasis on mercury toxicity drives the general population towards a trend of lower fish consumption. In Japan, the fish advisory encourages seafood consumption for nutritional benefits. Consequently, the decrease may be due to the shift towards a "Western diet". Also, the Japanese fish advisory seems to be less active in advocating the issue of fish consumption and mercury exposure, which may be partly responsible for the possible lesser attention of the consumers. Cultural factors may explain for the baseline difference in consumption and account partly for the change in Japanese consumer behavior. However, the dissimilarities in fish advisories may also be responsible for the variations in consumer behavior.

  6. The Supply Chain Risk Management

    OpenAIRE

    Skitsko Volodymyr I.; Voynikov Mykola Yu.

    2018-01-01

    The article considers current approaches of risk-management in supply chains, the main steps of the risk management process are analyzed and detailed both for a separate enterprise – participant of supply chain, for the supply chain in general, and for the Beer game, based on the international risk management standards. The article provides a way to assess the risks of the «producer» in the Beer game according to the three strategies of its behavior, which presumably can correspond to differe...

  7. 77 FR 31025 - Risk Communication Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2012-05-24

    ... on communicating and understanding uncertainty, and risk perception and information seeking when facing multiple risks. FDA intends to make background material available to the public no later than 2... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-N-0001...

  8. The Management Advisory Committee of the Inspection Validation Centre. 2nd report

    International Nuclear Information System (INIS)

    1985-06-01

    The document is the second report of the Management Advisory Committee of the Inspection Validation Centre (I.V.C.). The IVC is concerned with the ultrasonic inspection of the CEGB's proposed PWR reactor pressure vessel, and other components. The report deals with the technical progress since May 1984, and includes: interim validation, retrospective validation, examination of procedures, test assembly manufacture, interim validation of manual forging inspections, and validation facilities. (U.K.)

  9. Risk management for whales

    OpenAIRE

    Cont, R; Wagalath, L

    2016-01-01

    We propose framework for modeling portfolio risk which integrates market risk with liquidation costs which may arise in stress scenarios. Our model provides a systematic method for computing liquidation-adjusted risk measures for a portfolio. Calculation of Liquidation-adjusted VaR (LVaR) for sample portfolios reveals a substantial impact of liquidation costs on portfolio risk for portfolios with large concentrated positions.

  10. Business risk management

    International Nuclear Information System (INIS)

    Cosby, C.

    2015-01-01

    Bruce Power's definition: an emerging and demonstrable event or change in business plan assumptions that could impact Bruce Power's achievement of its business plan objectives and results. Risks can be either negative (threats) or positive (opportunities). Risks against the 5 year business plan Net Risk = impact * probability.

  11. Business risk management

    Energy Technology Data Exchange (ETDEWEB)

    Cosby, C., E-mail: Christine.cosby@brucepower.com [Bruce Power, Tiverton, ON (Canada)

    2015-07-01

    Bruce Power's definition: an emerging and demonstrable event or change in business plan assumptions that could impact Bruce Power's achievement of its business plan objectives and results. Risks can be either negative (threats) or positive (opportunities). Risks against the 5 year business plan Net Risk = impact * probability.

  12. TRManager – Technical Risk Manager

    Directory of Open Access Journals (Sweden)

    Mark A. Gregory

    2009-06-01

    Full Text Available This paper presents research into the development of a new information management technique called Technical Risk Manager. Project management involves the use of processes and information management techniques to aid decision making in the pursuit of project success. Project success may be achieved by meeting time, cost or performance criteria. Current project management practices focus on achieving time and cost project success criteria by using three information management techniques developed in the 1950s: Gantt, PERT and Critical Path Method. Technical Risk Manager has been developed to provide an information management technique that may be used to aid project management decision making in the pursuit of achieving the performance project success criteria.

  13. Smart Grid Risk Management

    Science.gov (United States)

    Abad Lopez, Carlos Adrian

    Current electricity infrastructure is being stressed from several directions -- high demand, unreliable supply, extreme weather conditions, accidents, among others. Infrastructure planners have, traditionally, focused on only the cost of the system; today, resilience and sustainability are increasingly becoming more important. In this dissertation, we develop computational tools for efficiently managing electricity resources to help create a more reliable and sustainable electrical grid. The tools we present in this work will help electric utilities coordinate demand to allow the smooth and large scale integration of renewable sources of energy into traditional grids, as well as provide infrastructure planners and operators in developing countries a framework for making informed planning and control decisions in the presence of uncertainty. Demand-side management is considered as the most viable solution for maintaining grid stability as generation from intermittent renewable sources increases. Demand-side management, particularly demand response (DR) programs that attempt to alter the energy consumption of customers either by using price-based incentives or up-front power interruption contracts, is more cost-effective and sustainable in addressing short-term supply-demand imbalances when compared with the alternative that involves increasing fossil fuel-based fast spinning reserves. An essential step in compensating participating customers and benchmarking the effectiveness of DR programs is to be able to independently detect the load reduction from observed meter data. Electric utilities implementing automated DR programs through direct load control switches are also interested in detecting the reduction in demand to efficiently pinpoint non-functioning devices to reduce maintenance costs. We develop sparse optimization methods for detecting a small change in the demand for electricity of a customer in response to a price change or signal from the utility

  14. INTERNAL AUDIT AND RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Elena RUSE

    2014-04-01

    Full Text Available The existence of risk in economic activity can not be denied. In fact, the risk is a concept which exists in every activity, the term of risk being identified with uncertainty, respectively the (unchance to produce an undesirable event. Internal audit and risk management aim at the same goal, namely the control of risks. Internal Audit performs several roles in risk management plan. The objectives of the internal audit function varies from company to company, but in all economic entities internal audit department aims to improve performance management, enterprise performance and thus improve the internal control system. This paper aims to demonstrate, among other things, that any event that may result in failure is unquestionably classified as risk.

  15. Integrated supply chain risk management

    Directory of Open Access Journals (Sweden)

    Riaan Bredell

    2007-11-01

    Full Text Available Integrated supply chain risk management (ISCRM has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly applied, this process may optimise management decision-making and assist in the protection and enhancement of shareholder value.

  16. Knowledge about fish consumption advisories: a risk communication failure within a university population.

    Science.gov (United States)

    Burger, Joanna; Gochfeld, Michael

    2008-02-15

    Considerable attention has focused on whether people are aware of fish consumption advisories, particularly among fishermen and as a function of demographic variables. Yet little attention has been directed at the messages people are receiving from fish consumption advisories. This study examines knowledge about the benefits and risks of fish in relation to ethnicity and the degree of knowledge in a general university population in New Jersey. Subjects were asked open-ended questions about risks and benefits and responses were grouped into categories. A far greater percent of people had heard something about the risks and benefits of eating fish than could report specific information about the risks or benefits. While only 16% of subjects did not know what the benefits of eating fish were, 62% did not have any specific information about why there were warnings. However, for people who had some specific information, a higher proportion (57%) could identify the chemicals (PCBs, mercury) causing the risks, than could identify omega-3 fatty acids as contributing to benefits (40%). Much of the knowledge was very general, such as eating fish is "good for the heart", "good for you", or "brain food". Less than half of the subjects could name species of fish that were either high or low in contaminants. There were ethnic disparities in knowledge about both the benefits and the risks from fish consumption. A higher percentage of whites knew about both the benefits and risks of fish consumption than others; Asians knew the least about the risks, and blacks and hispanics knew the least about the benefits. There were also ethnic differences in ability to name fish that are low in contaminants, or high in contaminants. Minorities, particularly hispanics, were unable to list species that are high in contaminants. We identified three levels of knowledge about fish consumption: 1) whether people are aware of the risks or benefits of fish consumption, 2) whether they have any

  17. Performance Evaluation of Individual Aircraft Based Advisory Concept for Surface Management

    Science.gov (United States)

    Gupta, Gautam; Malik, Waqar; Tobias, Leonard; Jung, Yoon; Hong, Ty; Hayashi, Miwa

    2013-01-01

    Surface operations at airports in the US are based on tactical operations, where departure aircraft primarily queue up and wait at the departure runways. NASA's Spot And Runway Departure Advisor (SARDA) tool was developed to address these inefficiencies through Air Traffic Control Tower advisories. The SARDA system is being updated to include collaborative gate hold, either tactically or strategically. This paper presents the results of the human-in-the-loop evaluation of the tactical gate hold version of SARDA in a 360 degree simulated tower setting. The simulations were conducted for the east side of the Dallas/Fort Worth airport. The new system provides gate hold, ground controller and local controller advisories based on a single scheduler. Simulations were conducted with SARDA on and off, the off case reflecting current day operations with no gate hold. Scenarios based on medium (1.2x current levels) and heavy (1.5x current levels) traffic were explored. Data collected from the simulation was analyzed for runway usage, delay for departures and arrivals, and fuel consumption. Further, Traffic Management Initiatives were introduced for a subset of the aircraft. Results indicated that runway usage did not change with the use of SARDA, i.e., there was no loss in runway throughput as compared to baseline. Taxiing delay was significantly reduced with the use of advisory by 45% in medium scenarios and 60% in heavy. Arrival delay was unaffected by the use of advisory. Total fuel consumption was also reduced by 23% in medium traffic and 33% in heavy. TMI compliance appeared unaffected by the advisory

  18. Performance Evaluation of SARDA: An Individual Aircraft-Based Advisory Concept for Surface Management

    Science.gov (United States)

    Jung, Yoon; Malik, Waqar; Tobias, Leonard; Gupta, Gautam; Hoang, Ty; Hayashi, Miwa

    2015-01-01

    Surface operations at airports in the US are based on tactical operations, where departure aircraft primarily queue up and wait at the departure runways. NASAs Spot And Runway Departure Advisor (SARDA) tool was developed to address these inefficiencies through Air Traffic Control Tower advisories. The SARDA system is being updated to include collaborative gate hold, either tactically or strategically. This paper presents the results of the human-in-the-loop evaluation of the tactical gate hold version of SARDA in a 360 degree simulated tower setting. The simulations were conducted for the east side of the Dallas-Fort Worth airport. The new system provides gate hold, ground controller and local controller advisories based on a single scheduler. Simulations were conducted with SARDA on and off, the off case reflecting current day operations with no gate hold. Scenarios based on medium (1.2x current levels) and heavy (1.5x current levels) traffic were explored. Data collected from the simulation was analyzed for runway usage, delay for departures and arrivals, and fuel consumption. Further, Traffic Management Initiatives were introduced for a subset of the aircraft. Results indicated that runway usage did not change with the use of SARDA, i.e., there was no loss in runway throughput as compared to baseline. Taxiing delay was significantly reduced with the use of advisory by 45 in medium scenarios and 60 in heavy. Arrival delay was unaffected by the use of advisory. Total fuel consumption was also reduced by 23 in medium traffic and 33 in heavy. TMI compliance appeared unaffected by the advisory.

  19. Enterprise risk management and disclosure

    Directory of Open Access Journals (Sweden)

    Nicoleta Farcane

    2008-01-01

    Full Text Available Our paper deals with aspects regarding risk and uncertainty. Many risk management methods are today implemented in organizations. This perspective reveals that managers are linked in different forms to the activities they are managing, depending on the conditions and levels of uncertainty they are in. Actually, these multiple levels of uncertainty lead to the conclusion that any situation in an organizational system can be classified in two different models of organizational phenomena: the organizational phenomena that are putting managers and stakeholders in conditions of risk and the organizational phenomena that are putting them in condition of uncertainty. Using content analyze in this paper we survey the disclosure level of risk management information in the annual report of top Romanian listed companies.

  20. RISKS IN INVESTMENT AND MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ms. Tatiana A. Ykovleva

    2016-12-01

    Full Text Available The article discusses the features of investment risks and their causes, as well as provides a detailed classification of investment risks. The authors reveal the essence and content of the investment process, risk management, providing material for presentation in the form of a diagram. In conclusion, the article explains the use of the system of specialized institutions as a way to exclude the basic, or primary investment risk.

  1. Risk Management Issues - An Aerospace Perspective

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks--risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements.. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner, Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  2. Improving Operational Risk Management Using Business Performance Management Technologies

    OpenAIRE

    Bram Pieket Weeserik; Marco Spruit

    2018-01-01

    Operational Risk Management (ORM) comprises the continuous management of risks resulting from: human actions, internal processes, systems, and external events. With increasing requirements, complexity and a growing volume of risks, information systems provide benefits for integrating risk management activities and optimizing performance. Business Performance Management (BPM) technologies are believed to provide a solution for effective Operational Risk Management by offering several combined ...

  3. Scope of environmental risk management

    Energy Technology Data Exchange (ETDEWEB)

    O' Riordan, T

    1979-01-01

    Environmental risk management embraces three techniques for project appraisal: cost/benefit analysis, environmental impact analysis and risk assessment. It also explicitly relates scientific investigations to political judgments, sometimes so closely that the two cannot be separated. Indeed it is now apparent that environmental risk management encompasses procedures both to review the relative merits and priorities of policies as well as to appraise the environmental risks of particular schemes. Until recently this relationship has not been fully appreciated, so much imagination and innovation is still required to develop the most-suitable mechanisms for review.

  4. The Theme of Risk Management

    Directory of Open Access Journals (Sweden)

    Chua, D. K. H.

    2014-07-01

    Full Text Available The papers in this issue of the Journal come from different industry sectors, yet there can be a common theme that ties them together. Two of the papers address explicitly the issue of risk management, while the other three may be related to it in different degrees. One of the critical factors for project success is risk identification, as determined by Chua et al. (1999. The importance of risk management cannot be overemphasized. Failure to identify crucial risk elements in a project can lead to significant project failures in terms of cost and schedule.

  5. Tailoring Risk Management in Design

    DEFF Research Database (Denmark)

    Tegeltija, M.; Oehmen, J.; McMahon, C. A.

    2018-01-01

    While risk quantification research has grown over the last few decades, only a limited number of studies have addressed the overall process integration of these approaches in design risk management. This paper argues that the choice of risk quantification method has strong implications for several...... process aspects. We investigate current risk management maturity models and suggest an expansion to accommodate requirements originating from the choice of quantification method, and to inform the choice of quantification method, based on other process parameters, validated through 3 case companies....

  6. Spent fuel management: Current status and prospects 1997. Proceedings of a regular advisory group meeting

    International Nuclear Information System (INIS)

    1998-03-01

    Spent fuel management has always been one of the important stages in the nuclear fuel cycle and it is still most vital problems common to all countries with nuclear reactors. It begins with the discharge of spent fuel from a power or a research reactor and ends with its ultimate disposition. Two options exist - an open, once-through cycle with direct disposal of the spent fuel and a closed cycle with reprocessing of the spent fuel, recycling of reprocessed plutonium and uranium in new mixed oxide fuels and disposal of the radioactive waste. Continuous attention is being given by the IAEA to the collection, analysis and exchange of information on spent fuel management. Its role in this area is to provide a forum for exchanging information and to co-ordinate and to encourage closer co-operation among Member States in certain research and development activities that are of common interest. Spent fuel management is recognized as a high priority IAEA activity. The Regular Advisory Group on Spent Fuel Management was established in 1982. The objective of the Regular Advisory Group is to serve as a means of exchanging information on the current status and progress of national programmes on spent fuel management and to provide advice to the IAEA. The results of the last Regular Advisory Group meeting (9-12 September 1997) are reflected in this report. It gives an overview of the status of spent fuel management programmes in a number of countries, a description of the current status and prospects of activities in this field and recommendations of the participants

  7. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  8. Managing Multiple Risk Factors

    National Research Council Canada - National Science Library

    Lollis, Charlie

    1998-01-01

    ...) contribute to the racial differences in cardiovascular risk and events among women. High levels of socioeconomic stress, higher dietary fat intake and sedentary lifestyle are more prevalent among black than white women...

  9. Knowledge management in support of enterprise risk management

    OpenAIRE

    Rodriguez, Eduardo; Edwards, John S.

    2014-01-01

    Risk management and knowledge management have so far been studied almost independently. The evolution of risk management to the holistic view of Enterprise Risk Management requires the destruction of barriers between organizational silos and the exchange and application of knowledge from different risk management areas. However, knowledge management has received little or no attention in risk management. This paper examines possible relationships between knowledge management constructs relate...

  10. The NASA risk management program

    International Nuclear Information System (INIS)

    Buchbinder, B.; Philipson, L.L.

    1989-01-01

    This paper reports that the NASA Risk Management Program has been established to ensure the appropriate application of risk-based procedures in support of the elimination, reduction, or acceptance of significant safety risks of concern in NASA. The term appropriate is emphasized, in that the particular procedures applied to each given risk are to reflect its character and prioritized importance, the technological and economic feasibility of its treatment. A number of key documents have been produced in support of this implementation. Databases, risk analysis tools, and risk communication procedures requisite to the execution of the risk management functions also are being developed or documented. Several risk management applications have been made and a comprehensive application to a major new NASA program is underway. This paper summarizes the development and current status of the NASA Risk Management Program. Some principal actions that have been carried out in NASA in consonance with the program are noted particularly, and views are presented on the program's likely future directions

  11. How to manage risk better

    CSIR Research Space (South Africa)

    Walwyn, DR

    2002-09-01

    Full Text Available Risk management practices in the R&D departments of many chemical and pharmaceutical companies lack much of the rigor and sophistication of the equivalent corporation in the financial sector. For instance investment decisions on research projects...

  12. Risk Management and Value Creation

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Roggi, Oliviero

    Corporate failures, periodic recessions, regional debt crises and volatile financial markets have intensified the focus on risk management as the means to deal with turbulent conditions. The ability to respond effectively to abrupt environmental impacts is considered an important source...... of competitive advantage. Yet, surprisingly little research has analyzed whether the presumed advantages of effective risk management are associated with superior outcomes. Here we present a comprehensive study of risk management effectiveness and the relationship to corporate performance based on more than 33......,500 observations in 3,400 firms over the turbulent 20-year period 1991-2010. Determining effective risk management as the ability to reduce earnings and cash flow volatility, we find that both have significant positive relationships to lagged performance measures after controlling for industry effects, company...

  13. Risk assessment and risk management of mycotoxins.

    Science.gov (United States)

    2012-01-01

    Risk assessment is the process of quantifying the magnitude and exposure, or probability, of a harmful effect to individuals or populations from certain agents or activities. Here, we summarize the four steps of risk assessment: hazard identification, dose-response assessment, exposure assessment, and risk characterization. Risk assessments using these principles have been conducted on the major mycotoxins (aflatoxins, fumonisins, ochratoxin A, deoxynivalenol, and zearalenone) by various regulatory agencies for the purpose of setting food safety guidelines. We critically evaluate the impact of these risk assessment parameters on the estimated global burden of the associated diseases as well as the impact of regulatory measures on food supply and international trade. Apart from the well-established risk posed by aflatoxins, many uncertainties still exist about risk assessments for the other major mycotoxins, often reflecting a lack of epidemiological data. Differences exist in the risk management strategies and in the ways different governments impose regulations and technologies to reduce levels of mycotoxins in the food-chain. Regulatory measures have very little impact on remote rural and subsistence farming communities in developing countries, in contrast to developed countries, where regulations are strictly enforced to reduce and/or remove mycotoxin contamination. However, in the absence of the relevant technologies or the necessary infrastructure, we highlight simple intervention practices to reduce mycotoxin contamination in the field and/or prevent mycotoxin formation during storage.

  14. 76 FR 45724 - Clearing Member Risk Management

    Science.gov (United States)

    2011-08-01

    ... proposed rules address risk management for cleared trades by futures commission merchants, swap dealers... Commission has proposed extensive regulations addressing open access and risk management at the derivatives..., 2011) (Risk Management Requirements for Derivatives Clearing Organizations). These proposed regulations...

  15. US Department of Energy environmental management advisory board public meeting

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    Contents of this publication include: list of participants; March 14, 1994--opening of public meeting and subcommittee reports, and public comment session; March 15, 1994--presentation by Thomas P. Grumbly, assistant secretary for environmental management, presentations by senior environmental management officials, and committee business.

  16. Producers' Complex Risk Management Choices

    NARCIS (Netherlands)

    Pennings, J.M.E.; Isengildina, O.; Irwin, S.H.; Garcia, P.; Good, D.L.

    2008-01-01

    Producers have a wide variety of risk management instruments available, making their choice(s) complex. The way producers deal with this complexity can vary and may influence the impact that the determinants, such as risk aversion, have on their choices. A recently developed choice bracketing

  17. Legal risk management in shipping

    DEFF Research Database (Denmark)

    Siig, Kristina

    The book discusses the most typical legal challenges met in the chartering, broker, agent or port management part of the shipping industry. It discusses these issues in both English and Scandinavian law and gives indications on how to best ensure your legal risk management in these parts...

  18. Remote technology in spent fuel management. Proceedings of an advisory group meeting

    International Nuclear Information System (INIS)

    1999-01-01

    Spent fuel management has always been one of the important stages in the nuclear fuel cycle and it is still one of the most vital problems common to all countries with nuclear reactors. It begins with the discharge of spent fuel from a power or research reactor and ends with its ultimate disposition either by direct disposal or by reprocessing of the spent fuel. Continuous attention is being given by the IAEA to the collection, analysis and exchange of information on spent fuel management. Its role in this area is to provide a forum for exchanging information and development activities that are of common interest. Within its spent fuel management programme, the IAEA has monitored the progress, the benefits and the implementation of remote technologies such as remote tools, robotics, etc. An Advisory Group Meeting on Remote Technology in Spent Fuel Management was held in September 1997 in order to bring together specialists working in this field and to collect information on new technical and economic developments. The objective of the Advisory Group meeting was to review remote technologies in use for the complete range of spent fuel handling and spent fuel management covering wet and dry environments, to describe ongoing developments and to prepare a technical report. This document contains contributions presented at the Meeting. Each paper was indexed and provided with an abstract

  19. Human System Risk Management for Space Flight

    Science.gov (United States)

    Davis, Jeffrey

    2015-01-01

    This brief abstract reviews the development of the current day approach to human system risk management for space flight and the development of the critical components of this process over the past few years. The human system risk management process now provides a comprehensive assessment of each human system risk by design reference mission (DRM) and is evaluated not only for mission success but also for long-term health impacts for the astronauts. The discipline of bioastronautics is the study of the biological and medical effects of space flight on humans. In 1997, the Space Life Sciences Directorate (SLSD) initiated the Bioastronautics Roadmap (Roadmap) as the "Critical Path Roadmap", and in 1998 participation in the roadmap was expanded to include the National Space Biomedical Research Institute (NSBRI) and the external community. A total of 55 risks and 250 questions were identified and prioritized and in 2000, the Roadmap was base-lined and put under configuration control. The Roadmap took into account several major advisory committee reviews including the Institute of Medicine (IOM) "Safe Passage: Astronaut care for Exploration Missions", 2001. Subsequently, three collaborating organizations at NASA HQ (Chief Health and Medical Officer, Office of Space Flight and Office of Biological & Physical Research), published the Bioastronautics Strategy in 2003, that identified the human as a "critical subsystem of space flight" and noted that "tolerance limits and safe operating bands must be established" to enable human space flight. These offices also requested a review by the IOM of the Roadmap and that review was published in October 2005 as "A Risk Reduction Strategy for Human Exploration of Space: A Review of NASA's Bioastronautics Roadmap", that noted several strengths and weaknesses of the Roadmap and made several recommendations. In parallel with the development of the Roadmap, the Office of the Chief Health and Medical Officer (OCHMO) began a process in

  20. Price Risk and Risk Management in Agriculture

    Directory of Open Access Journals (Sweden)

    Udo Broll

    2013-06-01

    Full Text Available This note studies the risk-management decisions of a risk-averse farmer. The farmer faces multiple sources of price uncertainty. He sells commodities to two markets at two prices, but only one of these markets has a futures market. We show that the farmer’s optimal commodity futures market position, i.e., a cross-hedge strategy, is actually an over-hedge, a full-hedge, or an under-hedge strategy, depending on whether the two prices are strongly positively correlated, uncorrelated, or negatively correlated, respectively.

  1. Managing Supplier Sustainability Risk

    OpenAIRE

    Harilainen, Hanna-Riitta

    2014-01-01

    Supply chains are increasingly global, often reaching to developing regions. The media pressure brand owners to be responsible, but a product is only as sustainable as the practices of all the companies involved in manufacturing it are. It’s not enough that the brand owner acts responsibly; sustainable practices have to reach component and raw material suppliers upstream. Image risk has often been recognized as reason for investing in sustainability. In the supply chain context, supplier m...

  2. Energy price risk management

    International Nuclear Information System (INIS)

    Evans, J.W.G.

    1998-01-01

    While long term, fixed price contracts for fuel procurement and export of excess power may lock in the economics of a CHP plant, these do not necessarily give the best pricing opportunities that may exist during the life of those contracts. A more prudent approach may be to vary the length of the contracts and markets are now developing in gas and electricity to assist in the management of such a portfolio. (Author)

  3. Underground risk management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Matsuyama, S.; Inoue, M.; Sakai, T.

    2006-03-15

    JCOAL has conducted Joint Research on an Underground Communication and Risk Management Information System with CSIRO of Australia under a commissioned study project for the promotion of coal use starting in fiscal 2002. The goal of this research project is the establishment of a new Safety System focusing on the comprehensive risk management information system by the name of Nexsys. The main components of the system are the Ethernet type underground communication system that represents the data communication base, and the risk management information system that permits risk analysis in real-time and provides decision support based on the collected data. The Nexsys is an open system and is a core element of the underground monitoring system. Using a vast amount of underground data, it is capable of accommodating a wide range of functions that were not available in the past. Because of it, it is possible to construct an advanced underground safety system. 14 figs., 4 tabs.

  4. Risk management for noncombustion wastes

    International Nuclear Information System (INIS)

    Connor, K.K.; Rice, J.S.

    1991-01-01

    The Noncombustion Waste Risk Management Project is designed to incorporate the insights and information developed in these projects into tools that will help utilities make better noncombustion waste management decisions. Specific project goals are to synthesize information useful to utilities on noncombustion wastes, emphasize waste reduction as a priority over end-of-pipe management, develop methods to manage the costs and risks associated with noncombustion wastes (e.g., direct costs, permitting costs, liability costs, public relations costs), develop software and documentation to deliver the information and analysis methods to the industry. This project was initiated EPRI's Environment Division in late 1988. The early phases of the project involved gathering information on current noncombustion waste management practices, specific utility problems and concerns with respect to these wastes, current and potential future regulations, and current and emerging management options. Recent efforts have focused on characterizing the direct and indirect (e.g., lawsuits, remedial action) costs of managing these wastes and on developing and implementing risk management methods for a subset of wastes. The remainder of this paper describes the specific issues addressed by and the results and insights from the three completed waste-specific studies

  5. Wastewater Facilities Operation and Management. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    Science.gov (United States)

    Long, David A.

    Local communities must be willing to spend funds to assure the proper operation and management of wastewater treatment facilities. Designed for citizen advisory groups, the one-hour learning session described in this instructor's manual covers problem areas, federal requirements, and responsibilities for wastewater plant operations and management.…

  6. Risk Management in the Exchange Fund Account

    OpenAIRE

    Michel Rochette

    2002-01-01

    In this article, author Michel Rochette of the Bank's Risk-Management Unit briefly describes the initiatives undertaken to identify, analyze, model, and manage the principal risks inherent in the transactions of the Exchange Fund Account (EFA), where the international reserves of the federal government are held. The author focuses on five types of risk: credit risk, market risk, liquidity risk, operational risk, and legal risk. In addition, the author presents the risk-management principles u...

  7. Managing nuclear supplier risks

    International Nuclear Information System (INIS)

    Ramberg, B.

    1990-01-01

    This paper reports that with the appearance of such third-tier suppliers as Argentina, Brazil, South Korea, Taiwan, China, and others capable of producing nuclear components and sensitive nuclear materials, assurance that importers are using nuclear energy benignly and safely may become more uncertain. It is therefore important to integrate emerging exporters and importers into a regime of norms designed to minimize nuclear risks. The experience of the London Nuclear Suppliers Group (NSG) to arrive at a code of conduct is encouraging. Placed in the context of the larger evolving nuclear energy regime that seeks to address nuclear safety, proliferation, terrorism, and military attacks on reactors, the international community has made substantial progress. Still, there is much that remains to be done

  8. Risk management through concurrency

    International Nuclear Information System (INIS)

    Childress, J.R.; Briant, V.B.

    1991-01-01

    More than ever before, management and technical professionals are concerned with the subtle and dynamic relationships between safety and performance in complex and hazardous industries. This is certainly true in the nuclear power industry. With the US electric energy industry on the verge of deregulation and increased competition, and with a virtual stoppage on building new nuclear power plants, the increasing demand for reliable sources of efficient electric energy is pressing the nuclear utilities to increase production. At the same time, public sentiment and regulatory pressures are increasing their focus on safety at all costs. The purpose of this paper is to present a proven approach to creating a new work culture for improved nuclear safety and performance. The concepts and material which make up this paper have been taken from both authors experience, research, and consulting in the nuclear industry for several years, as well as from over 20 years of consulting work on the relationships between organizational behavior, culture, and productivity

  9. 76 FR 27636 - Commerce Spectrum Management Advisory Committee Meeting

    Science.gov (United States)

    2011-05-12

    ... DEPARTMENT OF COMMERCE National Telecommunications and Information Administration Commerce... Administration, U.S. Department of Commerce. ACTION: Notice of open meeting, room location change. SUMMARY: This notice announces a change in the room location of a public meeting of the Commerce Spectrum Management...

  10. 75 FR 18259 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2010-04-09

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of... and financing estimates. This briefing will give the press an opportunity to ask questions about...

  11. 76 FR 2952 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2011-01-18

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of... and financing estimates. This briefing will give the press an opportunity to ask questions about...

  12. 75 FR 1839 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2010-01-13

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of..., financing estimates and technical charts. This briefing will give the press an opportunity to ask questions...

  13. 76 FR 41559 - Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2011-07-14

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of... and financing estimates. This briefing will give the press an opportunity to ask questions about...

  14. 78 FR 3498 - Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2013-01-16

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of... and financing estimates. This briefing will give the press an opportunity to ask questions about...

  15. 77 FR 41476 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2012-07-13

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of... and financing estimates. This briefing will give the press an opportunity to ask questions about...

  16. 75 FR 63541 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2010-10-15

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of... and financing estimates. This briefing will give the press an opportunity to ask questions about...

  17. Thirteenth annual report of the Technical Advisory Committee on the Nuclear Fuel Waste Management Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-15

    This report details activities since the last reporting period by the Technical Advisory Committee (TAC). The emphasis of the work in the Canadian Nuclear Fuel Waste Management Program (CNFWMP) has been on the writing of the Environmental Impact Statement (EIS) and the associated set of the primary reference document as well as supporting documents. These are in preparation for submission to the Environmental Assessment Review Panel who will lead the national evaluation of the disposal concept under the auspices of the Federal Environmental Assessment Review Office (FEARO).

  18. 11. annual report of the technical advisory committee on the nuclear fuel waste management program

    International Nuclear Information System (INIS)

    1990-10-01

    The Eleventh Annual Report of the Technical Advisory Committee (TAC) assesses the scientific and technical progress made within the Canadian Nuclear Fuel Waste Management Program (NFWMP) during the period July 1989 to June 1990. The Committee notes that the general concept of a multibarrier system involving geologic media and engineered systems is based on known technologies and current scientific knowledge, and has gained strong international scientific and engineering support as currently the most feasible and practical. TAC continues to endorse the full investigation of the concept of nuclear waste disposal deep in plutonic formations, such as those in the Canadian Shield

  19. Managing economic risks through simulation

    International Nuclear Information System (INIS)

    Griffin, B.J.; Eresman, R.K.

    1994-01-01

    Industrial operations are commonly managed in terms of such factors as raw material requirements, throughput, equipment reliability, and operator productivity. Simulation can be used to transform standard management performance measures into probabilistic measures which define the associated risks. These results provide valuable insight for effective management of economic risks. Case studies are presented using the Monte Carlo simulation method to demonstrate different applications of simulation techniques, various result formats, and their use for optimizing economic returns. In the first case study, design criteria for a large gas distribution system originally developed from worst-case demand estimates were modelled to provide a risk basis for decisions on alternative upgrading options. In the second, a commercial gas storage facility operation was modelled to develop economic marketing strategies balancing supply and demand requirements from multiple clients. 3 refs

  20. Branding and the Risk Management Imperative

    Directory of Open Access Journals (Sweden)

    Fournier Susan

    2018-05-01

    Full Text Available In an increasingly risky socioeconomic environment, management needs to proactively consider brand-related risks. To understand brands as tools for risk management, they need to understand four types of brand risk: brand reputation risk, brand dilution risk, brand cannibalization risk and brand stretch risk.

  1. Branding and the Risk Management Imperative

    OpenAIRE

    Fournier Susan; Srinivasan Shuba

    2018-01-01

    In an increasingly risky socioeconomic environment, management needs to proactively consider brand-related risks. To understand brands as tools for risk management, they need to understand four types of brand risk: brand reputation risk, brand dilution risk, brand cannibalization risk and brand stretch risk.

  2. Supply Chain Risk Management

    OpenAIRE

    Babková, Ivana

    2008-01-01

    Práce se zabývá problematikou řízení rizika v logistických řetězcích se zaměřením na jeden konkrétní článek řetězce. Definuje základní oblasti risk managementu, jeho hlavní aspekty a systém spojitého plánování. Zabývá se bezpečností práce v pojetí EU, České republiky a Velké Británie. V aplikační části uvádí řízení rizika v jednom článku logistického řetězce, skladu poskytovatele logistických služeb ve Velké Británii.

  3. Risk management for industrial safety

    International Nuclear Information System (INIS)

    Novogno, A.

    1989-01-01

    The catastrophic accidents which have occurred in the last decade, in both developed and developing countries, have drawn the attention of decision-makers in the safety area to the urgent necessity to assess and manage risks from hazardous industrial activities which are concentrated in large industrialized areas. The aim of this paper is to review experience gained in conducting studies in the area of 'comparisons of risks in energy systems' and on the practical application of 'cost effectiveness of risk reduction analysis among different energy systems' (case studies). It is also the aim of the paper to discuss and propose a general framework for defining an 'integrated approach' to risk assessment and management in highly industrialized regions within a country. (author)

  4. 12 CFR 917.3 - Risk management.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 917.3 Section 917.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD GOVERNANCE AND MANAGEMENT OF THE FEDERAL HOME LOAN BANKS POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.3 Risk management. (a) Risk management...

  5. [Risk Assessment and Risk Management of Chemicals in China].

    Science.gov (United States)

    Wang, Tie-yu; Zhou, Yun-qiao; Li, Qi-feng; Lü, Yong-long

    2016-02-15

    Risk assessment and risk management have been increasingly approved as an effective approach for appropriate disposal and scientific management of chemicals. This study systematically analyzed the risk assessment methods of chemicals from three aspects including health risk, ecological risk and regional risk. Based on the current situation of classification and management towards chemicals in China, a specific framework of risk management on chemicals was proposed by selecting target chemicals, predominant industries and related stakeholders as the objects. The results of the present study will provide scientific support for improving risk assessment and reasonable management of chemicals in China.

  6. A view on risk management

    International Nuclear Information System (INIS)

    Joksimovich, V.

    1991-01-01

    The world at large has enjoyed the benefits of industrial technology for almost two centuries. The managers of industrial facilities as well as members of the public focused on the benefits and typically ignored or underestimated the inherent risks entailed in deployment of these technologies. Two examples will be given for the sake of illustration. In the chemical industry, the impacts of various chemicals on humans are insufficiently understood. In addition, it was not even known that some hazardous chemicals could be formed in the chemical reactions taking place in various chemical reactors. This is equivalent to not knowing that Cesium-iodide compound can be formed within nuclear fuel nor the impact it might have on humans if released, which is inconceivable in the nuclear industry. In the era of risk recognition, many industrial managers proclaimed that safety is everybody's business. The basic premise behind this was that since everyone is responsible, no one can be blamed for accidents. This is, however, shifting because both economics and litigation are now compelling industrial managers to consider risk in conjunction with the benefit. The government managers in many cases interpreted their charter to reap benefits first and pay the price of risks later; e.g., the case of nuclear weapons production facilities seriously contaminated by radioactive and other hazardous materials. Cost of clean-up was estimated at more than $100 billion. Of course, the authors have similar examples in many other industries, e.g., Superfund project of chemical waste sites. The challenge for the technologists is to maximize the benefit/risk ratio, keeping the risks, real or perceived, acceptably small. This brings us to the issue of acceptable risks, the topic of this paper

  7. Developing Risk Management as a Competitive Capability

    OpenAIRE

    Silva, E.; Wu, Y.; Ojiako, U.

    2013-01-01

    At the level of the firm, three major parameters are found to influence the ability of SMEs to develop risk management competencies; these are enterprise risk management, internal control, and risk culture.

  8. Senior Audit and Risk Management Officer | CRDI - Centre de ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Primary Duties or Responsibilities Internal Audit Engagements Planning the Audit ... Develops professional quality audit working papers to support observations and findings; ... Corporate Risk, Advisory Services and Internal Audit Planning.

  9. Risk management at GPU Nuclear

    International Nuclear Information System (INIS)

    Long, R.L.

    1991-01-01

    This paper reports on GPU Nuclear. Among other goals, it established the independence of key safety functions as highlighted by the lessons learned from the accident. In particular, an independent Nuclear Assurance Division was established which include Quality Assurance, Training and Education, Emergency Preparedness, and Nuclear Safety Assessment. The latter consisted of corporate and site independent-safety-review groups. As the GPU Nuclear organization matured, a mid-1987 reorganization created an even more focused Planning and Nuclear Safety Division bringing together Nuclear Safety Assessment with Licensing and Regulatory Affairs and Risk Management. The Risk Management Group (RMG), which began its work in fall 1987, was formed to develop a framework for proactive identification, evaluation, and cost-effective reduction and management of risks of all types. The RMG set out to learn as much as possible about risks and their management in nuclear and other high-technology industries. This began with a thorough literature search. It progressed to interviews with individuals and organizations which have demonstrated innovative ideas, experience, and reputations for safe and reliable operation

  10. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  11. Integrated Foreign Exchange Risk Management

    DEFF Research Database (Denmark)

    Aabo, Tom; Høg, Esben; Kuhn, Jochen

    Empirical research has focused on export as a proxy for the exchange rate exposure and the use of foreign exchange derivatives as the instrument to deal with this exposure. This empirical study applies an integrated foreign exchange risk management approach with a particular focus on the role...

  12. CEA: assessment of risk management 2011

    International Nuclear Information System (INIS)

    2012-06-01

    This report proposes an overview of CEA activities in the field of risk management in different areas: impact on the environment, installation safety, management of occupational risks (occupational health and safety), radiological protection of workers, transportation of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of law risks, controls and audits. It finally presents the risk management department

  13. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  14. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  15. Reducing the risk, managing safety.

    Science.gov (United States)

    Aldridge, Peter

    2016-02-01

    Fire safety in healthcare premises has always been a challenge to those that discharge this duty. Statutory compliance should be a matter of course, but in an ever increasingly challenged NHS, even this is not a given. While the NHS is driven by managing very complex risk to deliver cutting edge healthcare, providers cannot be risk averse. Which risk, however, takes priority? Here Peter Aldridge, fire and corporate services manager at Leeds Teaching Hospitals NHS Trust, and Secretary to the National Association of Healthcare Fire Officers (NAHFO)--which will this month and next jointly stage fire safety seminars with IHEEM; see page 8--considers the key issues, with input from a fire officer at a leading mental health and community Trust.

  16. Risk Management Practices: The Ghanaian Firms' Perspective ...

    African Journals Online (AJOL)

    Using a quantitative approach the findings of the study are that Ghanaian firms understand risk and risk management. Additionally, operational, liquidity and credit risk are the most dominant risks experienced while risk identification and selection jointly determine risk management practices in Ghana. Based on the findings ...

  17. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  18. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    Halverson, T.G.

    1998-01-01

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  19. Risk Management for e-Business

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available In the new Internet economy, risk management plays a critical role to protect the organization and its ability to perform their business mission, not just its IT assets. Risk management is the process of identifying risk, assessing risk, and taking steps to reduce risk to an acceptable level. The risk management is an important component of a IT security program. Information and communications technology management and IT security are responsible for ensuring that technology risks are managed appropriately. These risks originate from the deployment and use of IT assets in various ways, such as configuring systems incorrectly or gaining access to restricted software.

  20. Risk Management Practices by Barbadian Banks

    Directory of Open Access Journals (Sweden)

    Anthony Wood

    2013-07-01

    The main findings of the paper are: risk managers perceive risk management as critical to their banks’ performance; the types of risks causing the greatest exposures are credit risk, operational risk, country/sovereign risk, interest rate risk and market risk; there was a high level of success with current risk management practices and these practices have evolved over time in line with the changing economic environment and regulatory updates. Overall, the findings suggest strongly that in light of the current depressed economic climate, banks operating in Barbados are indeed risk-focused or might we say “risk intelligent”.

  1. Tank waste remediation system risk management list

    International Nuclear Information System (INIS)

    Collard, L.B.

    1995-01-01

    The Tank Waste Remedation System (TWRS) Risk Management List and it's subset of critical risks, the Critical Risk Management List, provide a tool to senior RL and WHC management (Level-1 and -2) to manage programmatic risks that may significantly impact the TWRS program. The programmatic risks include cost, schedule, and performance risks. Performance risk includes technical risk, supportability risk (such as maintainability and availability), and external risk (i.e., beyond program control, for example, changes in regulations). The risk information includes a description, its impacts, as evaluation of the likelihood, consequences and risk value, possible mitigating actions, and responsible RL and WHC managers. The issues that typically form the basis for the risks are presented in a separate table and the affected functions are provided on the management lists

  2. Risk Management for Food Allergy

    DEFF Research Database (Denmark)

    Risk Management for Food Allergy is developed by a team of scientists and industry professionals who understand the importance of allergen risk assessment and presents practical, real-world guidance for food manufacturers. With more than 12 million Americans suffering from food allergies and little...... appropriate "safe" thresholds of ingredients, the food industry must take increasingly proactive steps to avoid direct or cross-contamination as well as ensuring that their products are appropriately labeled and identified for those at risk. This book covers a range of critical topics in this area, including...... indication of what is causing that number to continue to grow, food producers, packagers and distributors need to appropriately process, label and deliver their products to ensure the safety of customers with allergic conditions. By identifying risk factors during processing as well as determining...

  3. Compilation of reports prepared for the Secretary of Energy Advisory Board Task Force on Radioactive Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This report contains reports prepared for the Secretary of Energy Advisory Board Task Force on Radioactive Waste Management, from experts in the United States. The contents of the report focus mainly on public opinion, and government policies as perceived by the public.

  4. Compilation of reports prepared for the Secretary of Energy Advisory Board Task Force on Radioactive Waste Management

    International Nuclear Information System (INIS)

    1993-11-01

    This report contains reports prepared for the Secretary of Energy Advisory Board Task Force on Radioactive Waste Management, from experts in the United States. The contents of the report focus mainly on public opinion, and government policies as perceived by the public

  5. The Role of the Environmental Management Site Specific Advisory Board under the Federal Advisory Committee Act, With Emphasis on the Northern New Mexico Citizens' Advisory Board - 12482

    Energy Technology Data Exchange (ETDEWEB)

    Santistevan, Menice B. [Northern New Mexico Citizens' Advisory Board, 1660 Old Pecos Trail, Suite B, Santa Fe, New Mexico 87505 (United States)

    2012-07-01

    The Environmental Management Site Specific Advisory Board (EM SSAB) is comprised of eight Citizens' Advisory Boards, chartered under the Federal Advisory Committee Act (FACA) by the Assistant Secretary for Environmental Management for the U. S. Department of Energy (DOE). The purpose of the EM SSAB is to provide the DOE with recommendations regarding Environmental Management issues from legacy waste produced at major sites across the DOE Complex. The Northern New Mexico Citizens' Advisory Board (NNMCAB) is the site specific advisory board to the DOE on issues of environmental monitoring, remediation, waste management and long-term stewardship at Los Alamos National Laboratory (LANL). The other boards are located at: Hanford, Idaho, Nevada, Paducah, Portsmouth, Oak Ridge and Savannah River. Using broad citizen outreach and input, the SSAB provides an official mechanism for the citizenry at each of these sites to monitor current activities affecting the region and also to have input into the prioritization of future activities. 'The mission of the EM SSAB is to more directly involve stakeholders in EM Planning and decision-making processes for the nuclear weapons complex cleanup. DOE has various means of involving the public in its planning and decision-making processes; the EM SSAB is only one component of EM's public participation program, and is not intended to be an exclusive means of public participation. It is the policy of DOE and EM to conduct it programs in an open and responsive manner, thereby encouraging and providing the opportunity for public participation in its planning and decision-making processes. EM SSAB members are appointed to a two year term and may serve up to three terms. During this time, members are able to hear many presentation from subject matter experts, attend several site tours at their site and across the DOE complex and are able to express their concerns and give input to the prioritization of clean up at each

  6. 42 CFR 441.476 - Risk management.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  7. Probabilistic risk assessment as an aid to risk management

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1982-01-01

    Probabilistic risk assessments are providing important insights into nuclear power plant safety. Their value is two-fold: first as a means of quantifying nuclear plant risk including contributors to risk, and second as an aid to risk management. A risk assessment provides an analytical plant model that can be the basis for performing meaningful decision analyses for controlling safety. It is the aspect of quantitative risk management that makes probabilistic risk assessment an important technical discipline of the future

  8. Considerations on Integrating Risk and Quality Management

    Directory of Open Access Journals (Sweden)

    Maria POPESCU

    2011-03-01

    Full Text Available This paper aims to highlight the links between risk management and quality management and to study the possibility of their integrated approach. The study reviews the evolution of risk approach within organizations and stresses the need to increase the effectiveness of this approach by incorporating risk management methodology in the quality management system. Starting from this idea, the authors present the current state of risk approach into quality management, basic rules of integrated quality-risk management and major difficulties which may arise in the implementation of integrated quality–risk systems.

  9. Managing risks and hazardous in industrial operations

    Energy Technology Data Exchange (ETDEWEB)

    Almaula, S.C. [Woodward-Clyde International, Oakland, CA (United States)

    1996-12-31

    The main objective of this paper is to demonstrate that it makes good business sense to identify risks and hazards of an operation and take appropriate steps to manage them effectively. Developing and implementing an effective risk and hazard management plan also contibutes to other industry requirements and standards. Development of a risk management system, key elements of a risk management plan, and hazards and risk analysis methods are outlined. Comparing potential risk to the cost of prevention is also discussed. It is estimated that the cost of developing and preparing the first risk management plan varies between $50,000 to $200,000. 3 refs., 2 figs., 1 tab.

  10. Hanford Tanks Initiative risk management guide

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1997-01-01

    This project-specific Risk Management Guide describes the general approach and process being used by the HTI Project to manage risk associated with execution of the HTI mission. It includes the initial identification of risk and the quantification of its likelihood and severity of its consequences. It further addresses the formulation of risk mitigation plans, periodic statusing of the Risk Management List, and risk closure

  11. Managing IT Integration Risk in Acquisitions

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Kettinger, William J.

    2016-01-01

    The article discusses a framework for evaluating risk of information technology (IT) integration in acquisitions. Topics include the use of the experience of serial acquirer Trelleborg AB to show the merits of the framework for managing the risk and to determine low-risk acquisitions......, the importance of managing IT integration risk, and various risk areas for acquisition IT integration....

  12. Risk management in microfinance institutions

    OpenAIRE

    Batin, Artyom

    2014-01-01

    In the following paper I have tried to find the correlation between type of ownership and effective risk management in the operations of microfinance institutions in India. The results found are consistent with the current findings of how the type of ownership does not impact both the financial or social performance of MFIs. Dataset of 72 MFIs was acquired from the Microfinance Information Exchange on MFIs and evaluated using an OLS regression. The results show that the type of ownership insi...

  13. 78 FR 16271 - Joint Meeting of the Advisory Committee for Reproductive Health Drugs and the Drug Safety and...

    Science.gov (United States)

    2013-03-14

    ...] Joint Meeting of the Advisory Committee for Reproductive Health Drugs and the Drug Safety and Risk... Reproductive Health Drugs and the Drug Safety and Risk Management Advisory Committee. General Function of the... presentation may be limited. If the number of registrants requesting to speak is greater than can be reasonably...

  14. 76 FR 40735 - Joint Meeting of the Advisory Committee for Reproductive Health Drugs and the Drug Safety and...

    Science.gov (United States)

    2011-07-11

    ...] Joint Meeting of the Advisory Committee for Reproductive Health Drugs and the Drug Safety and Risk... Reproductive Health Drugs and the Drug Safety and Risk Management Advisory Committee. General Function of the... East, Adelphi, MD. The conference center telephone number is: 301 985-7300. Contact Person: Kalyani...

  15. 78 FR 2677 - Joint Meeting of the Advisory Committee for Reproductive Health Drugs and the Drug Safety and...

    Science.gov (United States)

    2013-01-14

    ...] Joint Meeting of the Advisory Committee for Reproductive Health Drugs and the Drug Safety and Risk... Reproductive Health Drugs and the Drug Safety and Risk Management Advisory Committee. General Function of the... before February 7, 2013. Time allotted for each presentation may be limited. If the number of registrants...

  16. 76 FR 59143 - Joint Meeting of the Advisory Committee for Reproductive Health Drugs and the Drug Safety and...

    Science.gov (United States)

    2011-09-23

    ...] Joint Meeting of the Advisory Committee for Reproductive Health Drugs and the Drug Safety and Risk... Reproductive Health Drugs and the Drug Safety and Risk Management Advisory Committee. General Function of the..., Adelphi, MD. The conference center telephone number is 301-985-7300. Contact Person: Kalyani Bhatt, Center...

  17. Risk management in nuclear power social aspects

    International Nuclear Information System (INIS)

    Sappa, N.N.

    1996-01-01

    Problems connected with safety evaluation and risk management during operation of nuclear power installations are considered. Social aspects of risk assessment of enterprises with increased danger are discussed

  18. Strategic raw materials. Risk management

    International Nuclear Information System (INIS)

    Bertau, Martin; Matschullat, Joerg; Kausch, Peter

    2014-01-01

    This volume is divided into four chapters: (1) Raw material management, (2) Primary raw materials, (3) Secondary raw materials and recycling, (4). Processing and products. The topics for the chapter ''Raw material management'' are: Substitution of raw materials - framework conditions and implementation; Thales: Strategic raw materials; Time for cooperation between the EU and China in raw materials policy; Availability of elements for the semiconductor industry; Market price risks of raw material-intensive companies - identification and management. The topics on the second item ''Primary raw materials'' are: The supply of economic-critical raw materials - A search and analysis for causes; Lithium extraction from primary raw materials - state and perspectives; The global market of rare earths - A balancing act; Rare earth deposits in Namibia; New technologies in exploration and discovery - Focus on activities in Europe. The third chapter, ''Secondary Raw Materials and Recycling'', covered the topics: Technology metals - Systemic Requirements along the recycling chain; Integrated re-use of high-tech and greentech wastes; From the sewage sludge ash to the phosphorus fertilizer RecoPhos P38 in the stress field of waste, fertilizer and soil protection. In chapter 4. ''Processing and products'' are the topics: Treatment and processing of rare earth metals; Processing of mineral resources - opportunities and challenges; Consequences of modern germanium chemistry; Strategic resources - Risk management. A review and outlook with a pinch of fantasy.. [de

  19. Value at Risk models for Energy Risk Management

    OpenAIRE

    Novák, Martin

    2010-01-01

    The main focus of this thesis lies on description of Risk Management in context of Energy Trading. The paper will predominantly discuss Value at Risk and its modifications as a main overall indicator of Energy Risk.

  20. Risk management in product innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1993-01-01

    In product innovation projects risk management has become increasingly important. Technological and commercial developments ask for effective and efficient product innovation. Systematic diagnosing and management of risks can help to make product innovation projects successful. In this paper a

  1. Drug utilization research and risk management

    NARCIS (Netherlands)

    Mazzaglia, Giampiero; Mol, Peter G. M.; Elseviers, Monique; Wettermark, Björn; Almarsdóttir, Anna Birna; Andersen, Morten; Benko, Ria; Bennie, Marion; Eriksson, Irene; Godman, Brian; Krska, Janet; Poluzzi, Elisabetta; Taxis, Katja; Vlahovic-Palcevski, Vera; Stichele, Robert Vander

    2016-01-01

    Good risk management requires continuous evaluation and improvement of planned activities. The evaluation impact of risk management activities requires robust study designs and carefully selected outcome measures. Key learnings and caveats from drug utilization research should be applied to the

  2. Operational Risk Management and Military Aviation Safety

    National Research Council Canada - National Science Library

    Ashley, Park

    1999-01-01

    .... The Army's Class A aviation mishap rate declined after it implemented risk management (RM) principles in 1987. This reduction caught the attention of Air Force leadership who have since stated that the application of operational risk management...

  3. The Management Advisory Committee of the Inspection Validation Centre - fifth report

    International Nuclear Information System (INIS)

    1988-07-01

    The Management Advisory Committee of the Inspection Validation Centre (IVC/MAC) was set up by the Chairman of the UKAEA early in 1983 with terms of reference to review the policy, scope, procedure and operation of the Inspection Validation Centre, to supervise its operation and to advise and report to the UKAEA appropriately. The Inspection Validation Centre (IVC) has been established at the UKAEA Northern Research Laboratories, Risley for the purpose of validating the procedures, equipment and personnel proposed by the CEGB for use in the ultrasonic inspection at various stages of the fabrication, erection and operation of the CEGB's PWR reactor pressure vessel and such other components as are identified by the CEGB. This report, for 1987/8, states that the IVC has continued to make progress in the provision of the validation services as specified. (author)

  4. THEORETICAL BASIS FOR MANAGEMENT OF PERSONNEL RISKS

    OpenAIRE

    Haliashova, Katsiaryna

    2017-01-01

    Necessity of personnel risks management is based on research results. The authors' approaches to the determination of personnel risks and to their management have been explored. The author's definition of the concept of "personnel risks" is proposed. A classification of personnel risks is developed depending on the stage of origin and the tasks of the personnel policy, as well as the methods of management personnel risks in the organization. The article presents a methodical approach to perso...

  5. 12 CFR 932.1 - Risk management.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  6. Study of International Standards of Risk Management

    Directory of Open Access Journals (Sweden)

    Dykan Volodymyr L.

    2014-01-01

    Full Text Available The goal of the article lies in the study of existing international standards of risk management, an important factor of improvement of risk management in domestic corporations and enterprises and development of recommendations on application of international standards in Ukraine, in particular, within the framework of building corporate systems of risk management. The conducted study shows that approaches on organisation of the process of risk management, used in standards of risk management, are of general character and differ with the degree of detailing. Their undoubted value in development of risk management in Ukraine is identification of a general direction of building corporate systems of risk management in practice. The said approaches at the national and corporate levels of standardisation in Ukraine within the framework of building corporate systems of risk management would allow improvement of risk management in corporations and enterprises. The prospect of further studies of domestic specialists in the field of risk management is development of the domestic standard of risk management with consideration of modern domestic specific features of development of risk management in Ukraine and leading foreign experience.

  7. Construction Management Risk System (CMRS for Construction Management (CM Firms

    Directory of Open Access Journals (Sweden)

    Kyungmo Park

    2017-02-01

    Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

  8. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  9. Risk management and audit | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... a well defined strategic and program framework and sound management processes; and ... A Risk Management Committee supports and monitors the Centre's ... placed on our highly qualified staff in our management of human resources.

  10. Managing risk with renewable resources

    International Nuclear Information System (INIS)

    Brower, M.C.; Bernow, S.; Duckworth, M.; Spinney, P.; Bell, K.

    1997-01-01

    One approach to managing risk is for a utility company to invest in diverse power sources such as wind power plants. Since wind plants consume no fuel, can be built in relatively small increments with short construction lead times, and generate no pollutants, it is often said that they offer significant protection from risks associated with conventional fossil-fuel power plants. With assistance from Convergence Research, Charles River Associates, and the Tellus Institute, the authors tested this hypothesis by conducting an in-depth analysis of the risk implications of a decision to build a 1,600 MW wind power plant instead of a 400 MW gas-fired combined cycle plant. (The two plants were assumed to have equal firm capacity.) The case study utility was Texas Utilities Electric, a very large investor-owned company serving an area with substantial, high-quality wind resources. The uncertain inputs included fuel prices, environmental regulations (specifically, CO 2 and air pollution controls), wind plant output, conventional plant availability, and load growth. Two different market scenarios were examined: traditional regulation and an unregulated wholesale market characterized either by a power pool or fixed-price contracts of varying duration. Conclusions are striking: under traditional regulation, wind energy provides a net present-value risk-reduction benefit of $3.4 to $7.8/MWh

  11. Managing risks: Seveso and Harrisburg

    International Nuclear Information System (INIS)

    Conrads-Herzog, A.; Krebsbach-Gnath, C.

    1980-01-01

    The publications dealing with the technical, organisation-relevant, and social preconditions for risk strategies rely on second-hand information, i.e. the conclusions which are drawn from the production accident in Seveso and the TMI-accident. A comparison results in common facts as well as in fundamental differences. In contrast to the authorities in Italy the authorities in the United States intervened more rapidly; the management of necessary measures was taken over by the authorities and very good information was given. (DG) [de

  12. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  13. Enterprise Content Management Implementation and Risk

    Directory of Open Access Journals (Sweden)

    Jaroslava Klegová

    2015-01-01

    Full Text Available Enterprise Content Management (ECM solutions are commonly used in many areas such as document management, record management, digital asset management, etc. Key features of ECM systems are capturing, indexing, preserving and retrieving of digital information. The state-of-the- art ECM solution can help revolutionize document management and further automated business processes which can lead to better decisions and competitive advantage. Risk management can reduce project failure and that is why controlling risk in ECM implementation projects is considered to be a major contributor to project success. To manage software risk, the first step is to identify a list of ECM projects’ risks. The present paper provides an overview of ECM implementation risks and contains findings from a small survey on experience of ECM implementation and risk in Czech enterprises. Risk of implementation in the public sector is discussed more deeply with case study examples.

  14. Risk management and energy systems

    International Nuclear Information System (INIS)

    Carlevaro, F.; Romerio, F.

    1992-01-01

    In five sessions the following topics were dealt with: risk problems, risk analysis and evaluation tools, risks in industrial societies, risks of energy production, technological risks, ethics and political-social consensus. figs., tabs., refs

  15. PERFORMANCE IN INTERNAL CONTROL AND RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    JELER (POPA IOANA

    2017-06-01

    Full Text Available The purpose of this article is to highlight the importance of internal control and risk management. In practice, economic entities meet a variety of risks that have the origins from the internal environment or the external one. Although there are different of views on addressing the concept of risk - threats or opportunities, event or action, accordingly uncertain, proposed by specialists in risk management in this article we try to present these issues and identify techniques to counter risks occurrence. In this article we present also means managing risk and why needs to be implemented at institutional level a risk management. The paper concludes by highlight the role of efficient risk management in the company’s management and company's activities.

  16. Calysto: Risk Management for Commercial Manned Spaceflight

    Science.gov (United States)

    Dillaman, Gary

    2012-01-01

    The Calysto: Risk Management for Commercial Manned Spaceflight study analyzes risk management in large enterprises and how to effectively communicate risks across organizations. The Calysto Risk Management tool developed by NASA's Kennedy Space Center's SharePoint team is used and referenced throughout the study. Calysto is a web-base tool built on Microsoft's SharePoint platform. The risk management process at NASA is examined and incorporated in the study. Using risk management standards from industry and specific organizations at the Kennedy Space Center, three methods of communicating and elevating risk are examined. Each method describes details of the effectiveness and plausibility of using the method in the Calysto Risk Management Tool. At the end of the study suggestions are made for future renditions of Calysto.

  17. Commercializing fuel cells: managing risks

    Science.gov (United States)

    Bos, Peter B.

    Commercialization of fuel cells, like any other product, entails both financial and technical risks. Most of the fuel cell literature has focussed upon technical risks, however, the most significant risks during commercialization may well be associated with the financial funding requirements of this process. Successful commercialization requires an integrated management of these risks. Like any developing technology, fuel cells face the typical 'Catch-22' of commercialization: "to enter the market, the production costs must come down, however, to lower these costs, the cumulative production must be greatly increased, i.e. significant market penetration must occur". Unless explicit steps are taken to address this dilemma, fuel cell commercialization will remain slow and require large subsidies for market entry. To successfully address this commercialization dilemma, it is necessary to follow a market-driven commercialization strategy that identifies high-value entry markets while minimizing the financial and technical risks of market entry. The financial and technical risks of fuel cell commercialization are minimized, both for vendors and end-users, with the initial market entry of small-scale systems into high-value stationary applications. Small-scale systems, in the order of 1-40 kW, benefit from economies of production — as opposed to economies to scale — to attain rapid cost reductions from production learning and continuous technological innovation. These capital costs reductions will accelerate their commercialization through market pull as the fuel cell systems become progressively more viable, starting with various high-value stationary and, eventually, for high-volume mobile applications. To facilitate market penetration via market pull, fuel cell systems must meet market-derived economic and technical specifications and be compatible with existing market and fuels infrastructures. Compatibility with the fuels infrastructure is facilitated by a

  18. Managing Risks in Dry Port Operations

    OpenAIRE

    Ciortescu Cezar-Gabriel; Pãvãla?cu Narcis Sebastian

    2012-01-01

    The purpose of this paper is to have an in-depth look into the phenomenon of risk assessment and risk management strategies in managing dry port operations as an integrated part into international containerized freight trade. The fact that world crises take the form of disruptions, bankruptcies, breakdowns, macroeconomic and political changes, and disasters leads to higher risks and makes risk management more and more difficult. This paper aims to discuss the theory behind the dry port concep...

  19. BEHAVIOURAL INSIGHTS INTO SUPPLY CHAIN RISK MANAGEMENT

    OpenAIRE

    Alexandra-Codruta Popescu (Bîzoi); Cristian-Gabriel Bîzoi

    2015-01-01

    Literature has focused largely on the field of supply chain risk management. Numerous risks occur within supply chain management. Until lately, behavioural risks (implying large amount of losses) have been neglected and considered not relevant. In this paper we provide an analysis of the importance of including behavioural research in logistics and supply chain risk management, what has been written so far and potential future research directions. Until now, literature on logistics and supply...

  20. Probability concepts in quality risk management.

    Science.gov (United States)

    Claycamp, H Gregg

    2012-01-01

    Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although risk is generally a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management tools are relatively silent on the meaning and uses of "probability." The probability concept is typically applied by risk managers as a combination of frequency-based calculation and a "degree of belief" meaning of probability. Probability as a concept that is crucial for understanding and managing risk is discussed through examples from the most general, scenario-defining and ranking tools that use probability implicitly to more specific probabilistic tools in risk management. A rich history of probability in risk management applied to other fields suggests that high-quality risk management decisions benefit from the implementation of more thoughtful probability concepts in both risk modeling and risk management. Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although "risk" generally describes a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management methodologies and respective tools focus on managing severity but are relatively silent on the in-depth meaning and uses of "probability." Pharmaceutical manufacturers are expanding their use of quality risk management to identify and manage risks to the patient that might occur in phases of the pharmaceutical life cycle from drug development to manufacture, marketing to product discontinuation. A probability concept is typically applied by risk managers as a combination of data-based measures of probability and a subjective "degree of belief" meaning of probability. Probability as

  1. Credit Risk Evaluation : Modeling - Analysis - Management

    OpenAIRE

    Wehrspohn, Uwe

    2002-01-01

    An analysis and further development of the building blocks of modern credit risk management: -Definitions of default -Estimation of default probabilities -Exposures -Recovery Rates -Pricing -Concepts of portfolio dependence -Time horizons for risk calculations -Quantification of portfolio risk -Estimation of risk measures -Portfolio analysis and portfolio improvement -Evaluation and comparison of credit risk models -Analytic portfolio loss distributions The thesis contributes to the evaluatio...

  2. The Radioactive Waste Management Advisory Committee's advice to ministers on the problems of 'small users' of radioactive materials

    International Nuclear Information System (INIS)

    2000-09-01

    The Radioactive Waste Management Advisory Committee (RWMAC) is the independent body that advises the UK Government, including the devolved administrations for Scotland and Wales, on issues relating to the management of civil radioactive waste. Radioactive wastes are produced by the civil nuclear industry, by the Ministry of Defence, and by a varied group of organisations known as 'Small Users'. Small Users include hospitals, universities and some non-nuclear industries, which use radioactive materials and, in turn, produce radioactive waste. In 1991, and again in 1996, RWMAC provided the Government with advice on the problems encountered by Small Users. These difficulties were associated both with specific aspects of the radioactive waste management required and with the controls exercised by the regulators. As part of its work programme for 1999-2000, Ministers asked the Committee to return to these issues. In volume, Small User radioactive wastes make up only a small part of the total UK inventory. However, like those produced by the nuclear and defence sectors, it is vital that they are managed properly, as some carry the potential for considerable harm. Equally, it is important that the financial costs imposed on Small Users as a result of regulation are commensurate with the actual health risk involved. Otherwise, for example, the benefits accruing from use of radioactive materials in medicine might be prejudiced. We have tried to strike an appropriate balance in arriving at the views set out in our report. The report draws attention to a number of areas that Government could usefully consider in respect of Small User waste management, possibly as part of its forthcoming radioactive waste management policy review. A key issue is the need to get to grips with the problem of historic redundant radioactive sources held under registration by Small Users. Many such sources are in the public sector and, under current funding arrangements, Small Users encounter

  3. RISK MANAGEMENT OF GERMAN FRUIT PRODUCERS

    Directory of Open Access Journals (Sweden)

    Annkatrin PORSCH

    2018-03-01

    Full Text Available Horticultural farms in Germany face substantial business risks. However, fruit farms often struggle to implement appropriate risk management processes, and the risk management literature widely has ignored this farm type. The aim of the study was to improve the assessment of risks by farmers and the choice of suitable risk management instruments. Therefore, a risk management process based on subjective probabilities and suitable for small and medium-sized farms was developed, considering the specific needs of family run businesses. An online survey was conducted to achieve a comprehensive view of the risk perception and risk management practices of German fruit producers. Price and production risks are the most relevant risk categories for fruit farmers. However, among single risk sources, those in the people risk category were seen as the most important. Results show significant interactions among risk categories and a significant correlation between loss experience and the rating of risk categories. The assumption that risk averse farmers generally rate risks higher than risk neutral or risk seeking farmers cannot be confirmed. Diversification seems to be the most important risk management instrument for many fruit producers, especially diversification of marketing channels, farm income, and production activities. Further research should focus on the apparent inconsistency between the satisfaction with instruments reported by farmers and the actual implementation of many of them (e.g., hail insurance and anti-hail net. Furthermore, there is a need for research, to develop decision models considering the interactions of risks and risk management instruments, loss experience and risk seeking attitudes.

  4. CEA - Assessment of risk management 2013

    International Nuclear Information System (INIS)

    Bigot, Bernard; Bonnevie, Edwige; Maillot, Bernard

    2014-06-01

    After some introducing texts by CEA managers, this report proposes a rather detailed overview and presentation of CEA activities, objectives and obtained results in different fields: protection and control of the environment, installation safety, health, safety and radiation protection, transports of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of legal risks, internal controls and audits, activity of the risk management department, CEA activities from research to industry

  5. [The relevance of clinical risk management].

    Science.gov (United States)

    Gulino, Matteo; Vergallo, Gianluca Montanari; Frati, Paola

    2011-01-01

    Medical activity includes a risk of possible injury or complications for the patients, that should drive the Health Care Institutions to introduce and/ or improve clinical Risk management instruments. Although Italy is still lacking a National project of Clinical Risk Management, a number of efforts have been made by different Italian Regions to introduce instruments of risk management. In addition, most of National Health Care Institutions include actually a Department specifically in charge to manage the clinical risk. Despite the practical difficulties, the results obtained until now suggest that the risk management may represent a useful instrument to contribute to the reduction of errors in clinical conduct. Indeed, the introduction of adequate instruments of prevention and management of clinical risk may help to ameliorate the quality of health care Institution services.

  6. Contradictions Between Risk Management and Sustainable Development

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, Odd Einar; Langhelle, Oluf; Engen, Ole A. [Univ. of Stavanger (Norway). Dept. of Media, Culture and Social Science

    2006-09-15

    The aim of this paper is to discuss how risk management as a methodology and mindset influence on priorities and decisions concerning sustainable development. Management of risks and hazards often rely on partial analysis with a limited time frame. This may lead to a paradoxical situation where risk management and extended use of risk analysis could hamper long term sustainable development. The question is: Does the use of risk and vulnerability analysis (RaV-analysis) hamper or contribute to sustainable development? Because risk management and assessment has a more narrow scope and a limited time perspective based on well established methodologies, the tangible impacts of risk reducing measures in a project is easier to calculate than long-term and intangible impacts on global development. Empirical evidence is still scarce, but our preliminary conclusion is that mainstream risk management and assessments is counterproductive to sustainable development.

  7. Contradictions Between Risk Management and Sustainable Development

    International Nuclear Information System (INIS)

    Olsen, Odd Einar; Langhelle, Oluf; Engen, Ole A.

    2006-01-01

    The aim of this paper is to discuss how risk management as a methodology and mindset influence on priorities and decisions concerning sustainable development. Management of risks and hazards often rely on partial analysis with a limited time frame. This may lead to a paradoxical situation where risk management and extended use of risk analysis could hamper long term sustainable development. The question is: Does the use of risk and vulnerability analysis (RaV-analysis) hamper or contribute to sustainable development? Because risk management and assessment has a more narrow scope and a limited time perspective based on well established methodologies, the tangible impacts of risk reducing measures in a project is easier to calculate than long-term and intangible impacts on global development. Empirical evidence is still scarce, but our preliminary conclusion is that mainstream risk management and assessments is counterproductive to sustainable development

  8. Risk management with options and futures under liquidity risk

    OpenAIRE

    Adam-Müller, A F A; Panaretou, A

    2009-01-01

    Futures hedging creates liquidity risk through marking to market. Liquidity risk matters if interim losses on a futures position have to be financed at a markup over the risk-free rate. This study analyzes the optimal risk management and production decisions of a firm facing joint price and liquidity risk. It provides a rationale for the use of options on futures in imperfect capital markets. If liquidity risk materializes, the firm sells options on futures in order to partly cover this liqui...

  9. Cattle farmers’ perceptions of risk and risk management strategies

    DEFF Research Database (Denmark)

    Bishu, Kinfe G.; O'Reilly, Seamus; Lahiff, Edward

    2018-01-01

    This study analyzes cattle farmers’ perceptions of risk and risk management strategies in Tigray, Northern Ethiopia. We use survey data from a sample of 356 farmers based on multistage random sampling. Factor analysis is employed to classify scores of risk and management strategies, and multiple...... utilization were perceived as the most important strategies for managing risks. Livestock disease and labor shortage were perceived as less of a risk by farmers who adopted the practice of zero grazing compared to other farmers, pointing to the potential of this practice for risk reduction. We find strong...... evidence that farmers engage in multiple risk management practices in order to reduce losses from cattle morbidity and mortality. The results suggest that government strategies that aim at reducing farmers’ risk need to be tailored to specific farm and farmer characteristics. Findings from this study have...

  10. Hazard evaluation and risk management

    International Nuclear Information System (INIS)

    Fritzsche, A.F.

    1986-01-01

    The eigth chapter deals with the actual handling of hazards. The principal issue concerns man's behaviour towards hazards as an individual formerly and today; the evaluation of expected results of both a positive and a negative kind as determined by the individual's values which may differ and vary greatly from one individual to the next. The evaluation of benefit and hazard as well as the risk management resulting from decision-taking are political processes in the democratic state. Formal decision-taking tools play a major role in this process which concerns such central issues like who will participate; how the decision is arrived at; the participation of citizens; specialist knowledge and participation of the general public. (HSCH) [de

  11. Benchmarking Outdoor Expeditionary Program Risk Management Strategies

    Science.gov (United States)

    Meerts-Brandsma, Lisa; Furman, Nate; Sibthorp, Jim

    2017-01-01

    In 2003, the University of Utah and the National Outdoor Leadership School (NOLS) completed a study that developed a risk management taxonomy in the outdoor adventure industry and assessed how different outdoor expeditionary programs (OEPs) managed risk (Szolosi, Sibthorp, Paisley, & Gookin, 2003). By unifying the language around risk, the…

  12. Information risk management a practitioner's guide

    CERN Document Server

    Sutton, David

    2014-01-01

    Information risk management (IRM) is about identifying, assessing and prioritising risks to keep information secure and available. This accessible book provides practical guidance to the principles and development of a strategic approach to an IRM programme. The only textbook for the BCS Practitioner Certificate in Information Risk Management.

  13. Active Risk Management and Banking Stability

    NARCIS (Netherlands)

    Silva Buston, C.F.

    2013-01-01

    Abstract: This paper analyzes the net impact of two opposing effects of active risk management at banks on their stability: higher risk-taking incentives and better isolation of credit supply from varying economic conditions. We present a model where banks actively manage their portfolio risk by

  14. Risk Management and Financial Derivatives: An Overview

    NARCIS (Netherlands)

    S.M. Hammoudeh (Shawkat); M.J. McAleer (Michael)

    2012-01-01

    textabstractRisk management is crucial for optimal portfolio management. One of the fastest growing areas in empirical finance is the expansion of financial derivatives. The purpose of this special issue on “Risk Management and Financial Derivatives” is to highlight some areas in which novel

  15. Risk management at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Cummings, G.E.; Strait, R.S.

    1993-10-01

    Managing risks at a large national laboratory presents a unique set of challenges. These challenges include the management of a broad diversity of activities, the need to balance research flexibility against management control, and a plethora of requirements flowing from regulatory and oversight bodies. This paper will present the experiences of Lawrence Livermore National Laboratory (LLNL) in risk management and in dealing with these challenges. While general risk management has been practiced successfully by all levels of Laboratory management, this paper will focus on the Laboratory's use of probabilistic safety assessment and prioritization techniques and the integration of these techniques into Laboratory operations

  16. Financial Risk Ratios and Earnings Management: Reducing Uncertainties in Shariah-compliant Companies

    Directory of Open Access Journals (Sweden)

    Soheil Kazemian

    2018-01-01

    Full Text Available This study examines whether Shariah-compliant companies practice earnings management by investigating the relationship among the risk of financial distress, leverage, and free cash flow in discretionary accruals, which function as a substitute for earnings management. This empirical research is conducted on a sample of Malaysian Shariah-compliant companies from all industries in Bursa Malaysia from 2012 to 2014. Results show that Shariah-compliant companies are highly influenced by the risk of financial distress, leverage, and free cash flow. This study argues that working as either Shariah-compliant or non-Shariah-compliant does not affect the level of earnings management through financial distress, high leverage, and free cash flow by managers. Results should be of interest to stakeholders, shareholders, and regulatory bodies (i.e., the Shariah Advisory Council and the Securities Commission that oversee the accountability of corporate financial reporting to prevent earnings management in Shariah-compliant companies. Findings can also aid relevant authorities (i.e., the Shariah Advisory Council and the Security Commission in Malaysia in overcoming or reducing problems related to earnings management. This study is one of the most significant works in Malaysia in terms of sample size and methodology. It argues that the three elements of earnings management (i.e., financial distress, high leverage, and free cash flow influence better disclosure of reported earnings.

  17. Evaluating risk communication about fish consumption advisories: efficacy of a brochure versus a classroom lesson in Spanish and English.

    Science.gov (United States)

    Burger, Joanna; McDermott, Melanie Hughes; Chess, Caron; Bochenek, Eleanor; Perez-Lugo, Marla; Pflugh, Kerry Kirk

    2003-08-01

    Presentation format can influence the way target audiences understand risk-related information. Brochures or fish fact sheets are the methods traditionally used by state agencies to inform the public about fish consumption advisories and the risks from consuming fish. This study examines the efficacy of presenting information about the risks from consuming contaminated fish and shellfish in two different formats: a brochure and classroom presentation. The two instruments were developed and tested in Spanish and English, reflecting the local ethnic composition in the Newark Bay Complex. The instruments were tested on women of child-bearing age at the Women, Infants, and Children Center in Elizabeth, New Jersey. Detailed diagrams were used in both presentations, including contaminated fish species, fish preparation methods, and food chain bioaccumulation and transmission to the fetus. There were few language-related differences in the efficacy of the classroom lesson, and the main ideas were understood by both groups. Where there were significant differences in understanding about the risks from consuming fish or crabs from the contaminated waters of Newark Bay, in all cases the women exposed to the classroom lesson had a better understanding than those who read the brochure. Ninety-six percent of the women who heard the lesson understood that it was unsafe to eat fish from the port, compared to 72% of those reading the brochure. Both formats succeeded in imparting information to most women about the area under advisories, the fish species under advisories, and transmission of toxins to the fetus. Information on fish preparation was recalled less clearly, partly because women were asked to relate methods to reduce the risk from consuming fish from 11 presented, and most recalled only two or three of the list. The advantages and disadvantages of conducting short classes to women of child-bearing age are discussed.

  18. Risk factor management: antiatherogenic therapies.

    Science.gov (United States)

    Gielen, Stephan; Sandri, Marcus; Schuler, Gerhard; Teupser, Daniel

    2009-08-01

    Despite the advances in interventional techniques, the management of stable atherosclerosis remains the domain of optimal guideline-oriented therapy. Recent studies on the effects of aggressive lipid lowering on atheroma volume changes using intravascular ultrasound indicate that it is possible to achieve atherosclerosis regression by reaching low-density lipoprotein (LDL) levels less than 75 mg/dl. The pleiotropic anti-inflammatory effects of statins contribute to the reduction of cardiovascular (CV) event observed with aggressive lipid lowering. As a second important strategy to prevent disease progression, lifestyle changes with regular physical exercise are capable of halting the atherosclerotic process and reducing angina symptoms and CV events. Optimal medical therapy, a healthy lifestyle with regular physical exercise, and coronary interventions are not mutually exclusive treatment strategies. Over the last few decades, both have proved to be effective in significantly reducing the CV mortality in the Western world. However, risk factor modification contributed to at least half the effect in the reduction of CV mortality. This figure provides an estimate of what could be achieved if we were to take risk factor modification more seriously - especially in the acute care setting. The knowledge is there: today we have a better understanding on how to stop progression and even induce regression of atherosclerosis. Much research still needs to be done and will be done. In the meantime, however, our primary focus should lie in implementing what is already known. In addition, it is essential not just to treat CV risk factors, but also to treat them to achieve the target values as set by the guidelines of European Society of Cardiology.

  19. Strategies for successful software development risk management

    Directory of Open Access Journals (Sweden)

    Marija Boban

    2003-01-01

    Full Text Available Nowadays, software is becoming a major part of enterprise business. Software development is activity connected with advanced technology and high level of knowledge. Risks on software development projects must be successfully mitigated to produce successful software systems. Lack of a defined approach to risk management is one of the common causes for project failures. To improve project chances for success, this work investigates common risk impact areas to perceive a foundation that can be used to define a common approach to software risk management. Based on typical risk impact areas on software development projects, we propose three risk management strategies suitable for a broad area of enterprises and software development projects with different amounts of connected risks. Proposed strategies define activities that should be performed for successful risk management, the one that will enable software development projects to perceive risks as soon as possible and to solve problems connected with risk materialization. We also propose a risk-based approach to software development planning and risk management as attempts to address and retire the highest impact risks as early as possible in the development process. Proposed strategies should improve risk management on software development projects and help create a successful software solution.

  20. Risk and/or resilience management

    Directory of Open Access Journals (Sweden)

    Jean-Paul Louisot

    2015-06-01

    Full Text Available Risk management aims at managing all the uncertainties that may interfere with the objectives and missions of the organization. Resilience engineering aims at building its capacity to get over disturbances or stress while keeping the functionalities needed to survive, and possibly thrive. A recently open debate on an Internet blog launched by the risk managers of the Scottish Widows Bank seems to arise from what some professionals see as two competing branches of the management sciences. Whereas through the development of ERM – Enterprise-wide Risk Managementrisk management is emerging at last to become a science, as well as an art and a practice, the mentioned above centered on the role of a newly forged name “resilience management”. This opens a new front of the many debates that could derail the path to maturity of Risk Management as a science and reopen new silos much as Business Impact Analysis, BIA, or continuity management, might do if a clear distinction is not made between science, objectives and tools. However, because organizations are so interconnected today in the supply cloud that it is inevitable that they will face catastrophic risk and this is why resilience needs to be a core objective of any risk management plan? Whereas traditional risk management techniques alone may not be adequate to deal with such pervasive and insipient risk scenarios, resilience is ingrained into ERM

  1. Risk Management in Mergers and Acquisitions

    Directory of Open Access Journals (Sweden)

    Dmitry O. Verdiev

    2015-01-01

    Full Text Available M&A statistics show that less than a third of newly merged companies has realized their planned synergistic effects and increased shareholder value. According to the author, such disgusting situation is due to improper planning and failure of corporate management to understand the importance of risk management in M&A. Lack of practice in identification, evaluation, mitigation and regular monitoring of risks leads to the situation when many companies merge despite the fact that the merger bears substantial risks. Corporate management fails to include risk mitigation expenses in merger costs. In many cases, risk mitigation expenses may be so substantive that the merger loses its attractiveness. Only few companies implement risk management methodology while planning M&A activity. This methodology may anticipate and minimize the consequences of various risk factors that negatively influence integration process. The article suggests an implementation of risk management best practice. This risk management best practice may act as an effective tool of successful realization of synergistic effects in M&A and may be helpful in increasing shareholder value in post-merger period. Risk management is conducted throughout the stages of merger and includes identification, analysis, assessment, management and monitoring of risks. Implementation of risk management at early stages of merger planning significantly decreases uncertainty in relation to achievement of financial and operational goals of newly merged company. The article provides with typical M&A risk matrix that may be adapted for specific M&A project. Risk matrix includes a register of risks sorted by stages of M&A deal, quality assessment of their probability, influence and impact on merger as well as risk mitigation methods.

  2. 77 FR 13585 - Electricity Subsector Cybersecurity Risk Management Process Guideline

    Science.gov (United States)

    2012-03-07

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process Guideline AGENCY... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk... Cybersecurity Risk Management Process Guideline. The primary goal of this guideline is to describe a risk...

  3. Hybrid Risk Management Methodology: A Case Study

    Directory of Open Access Journals (Sweden)

    Jacky Siu-Lun Ting

    2009-10-01

    Full Text Available Risk management is a decision-making process involving considerations of political, social, economic and engineering factors with relevant risk assessments relating to a potential hazard. In the last decade, a number of risk management tools are introduced and employed to manage and minimize the uncertainty and threats realization to the organizations. However, the focus of these methodologies are different; in which companies need to adopt various risk management principles to visualize a full picture of the organizational risk level. Regarding to this, this paper presents a new approach of risk management that integrates Hierarchical Holographic Modeling (HHM, Enterprise Risk Management (ERM and Business Recovery Planning (BCP for identifying and assessing risks as well as managing the consequences of realized residual risks. To illustrate the procedures of the proposed methodology, a logistic company ABC Limited is chosen to serve as a case study Through applying HHM and ERM to investigate and assess the risk, ABC Limited can be better evaluated the potential risks and then took the responsive actions (e.g. BCP to handle the risks and crisis in near future.

  4. Continuous Risk Management: A NASA Program Initiative

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  5. Software And Systems Engineering Risk Management

    Science.gov (United States)

    2010-04-01

    RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software

  6. Implications of Risk Management Practices on Financial ...

    African Journals Online (AJOL)

    Implications of Risk Management Practices on Financial Performance of Sugar ... The respondents were functional heads of the companies under the survey. ... of downside losses in order to minimize the negative impact of risk on returns.

  7. RISK MANAGEMENT MECHANISM OF GRAIN PROCESSING ENTERPRISES

    Directory of Open Access Journals (Sweden)

    I. P. Bogomolova

    2013-01-01

    Full Text Available In article the main characteristics of a control system by risks (the purpose, properties, the principles, requirements are defined, and also the possible mechanism of risk management of the flour-grinding enterprises is considered.

  8. Business managers turn to risk assessment

    International Nuclear Information System (INIS)

    Allen, Frank

    1993-01-01

    Risk assessments have evolved to help technical managers in nuclear and other industries to design and operate plant with safety in mind. However, they are now developing into the area of business management. (author)

  9. Highly Enhanced Risk Management Emergency Satellite

    DEFF Research Database (Denmark)

    Dalmeir, Michael; Gataullin, Yunir; Indrajit, Agung

    HERMES (Highly Enhanced Risk Management Emergency Satellite) is potential European satellite mission for global flood management, being implemented by Technical University Munich and European Space Agency. With its main instrument - a reliable and precise Synthetic Aperture Radar (SAR) antenna...

  10. Business resilience: Reframing healthcare risk management.

    Science.gov (United States)

    Simeone, Cynthia L

    2015-09-01

    The responsibility of risk management in healthcare is fractured, with multiple stakeholders. Most hospitals and healthcare systems do not have a fully integrated risk management system that spans the entire organizational and operational structure for the delivery of key services. This article provides insight toward utilizing a comprehensive Business Resilience program and associated methodology to understand and manage organizational risk leading to organizational effectiveness and operational efficiencies, with the fringe benefit of realizing sustainable operational capability during adverse conditions. © 2015 American Society for Healthcare Risk Management of the American Hospital Association.

  11. Probabilistic risk assessment methodology for risk management and regulatory applications

    International Nuclear Information System (INIS)

    See Meng Wong; Kelly, D.L.; Riley, J.E.

    1997-01-01

    This paper discusses the development and potential applications of PRA methodology for risk management and regulatory applications in the U.S. nuclear industry. The new PRA methodology centers on the development of This paper discusses the time-dependent configuration risk profile for evaluating the effectiveness of operational risk management programs at U.S. nuclear power plants. Configuration-risk profiles have been used as risk-information tools for (1) a better understanding of the impact of daily operational activities on plant safety, and (2) proactive planning of operational activities to manage risk. Trial applications of the methodology were undertaken to demonstrate that configuration-risk profiles can be developed routinely, and can be useful for various industry and regulatory applications. Lessons learned include a better understanding of the issues and characteristics of PRA models available to industry, and identifying the attributes and pitfalls in the developement of risk profiles

  12. THE ANALYSIS OF RISK MANAGEMENT PROCESS WITHIN MANAGEMENT

    Directory of Open Access Journals (Sweden)

    ROMANESCU MARCEL LAURENTIU

    2016-10-01

    Full Text Available This article highlights the risk analysis within management, focusing on how a company could practicaly integrate the risks management in the existing leading process. Subsequently, it is exemplified the way of manage risk effectively, which gives numerous advantages to all firms, including improving their decision-making process. All these lead to the conclusion that the degree of risk specific to companies is very high, but if managers make the best decisions then it can diminish it and all business activitiy and its income are not influenced by factors that could disturb in a negative way .

  13. Economic Exposure and Integrated Risk Management

    OpenAIRE

    Miller, Kent D.

    1994-01-01

    Most corporate risk management research focuses on particular risk exposures to the exclusion of other interrelated exposures. By contrast, this study models corporate risk exposures using a multivariate approach integrating the distinct exposures of interest to finance and strategy researchers. The paper addresses the implications of multivariate modeling for corporate risk management, some key methodological issues arising in empirical estimation of corporate economic exposrues, and direc...

  14. PERFORMANCE IN INTERNAL CONTROL AND RISK MANAGEMENT

    OpenAIRE

    JELER (POPA) IOANA; FOCŞAN ELEONORA IONELA; CORICI MARIAN CĂTĂLIN

    2017-01-01

    The purpose of this article is to highlight the importance of internal control and risk management. In practice, economic entities meet a variety of risks that have the origins from the internal environment or the external one. Although there are different of views on addressing the concept of risk - threats or opportunities, event or action, accordingly uncertain, proposed by specialists in risk management in this article we try to present these issues and identify techniques to ...

  15. APPLIED ISSUES ABOUT BANKING RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Elena Geanina Clipici

    2017-09-01

    Full Text Available The following paper emphasizes the need to deepen the understanding of the notion of banking risk management by explaining the significant risks the bank encounters during financial exercises as well as their additional entries. The study of the paper will focus on UniCredit Bank during the years 2014 and  2015 on all types of risks, in which we will provide comprehensive data on how the UniCredit Bank management applies its risk policies.

  16. CEA - Assessment of risk management for 2012

    International Nuclear Information System (INIS)

    Bonnevie, Edwige

    2013-06-01

    This report proposes an overview of the main events, actions performed by the CEA, and facts for 2012 regarding protection and monitoring of the environment, installation safety, occupational health and safety, radiological protection of workers, transportation of hazardous materials, waste management, protection of sites, installations and heritage, emergency situation management, legal risk management, internal controls and audits. It also presents the organisation and action of the risk management department within the CEA

  17. Management Ownership and Risk-Shifting Investment

    OpenAIRE

    Nobuyuki Teshima

    2012-01-01

    This study analyzes the relationship between management ownership and its risk-shifting incentive. We first present a simple model showing that the risk-shifting incentive of management of financially distressed firms increases as the management ownership of the firm increases. Empirically, we test the hypothesis that under the former Japanese Corporate Reorganization Law, firms with higher management ownership are more likely to use legal rather than private reorganization. Since the reorgan...

  18. Feedback on flood risk management

    Science.gov (United States)

    Moreau, K.; Roumagnac, A.

    2009-09-01

    For several years, as floods were increasing in South of France, local communities felt deprive to assume their mission of protection and information of citizens, and were looking for assistance in flood management. In term of flood disaster, the fact is that physical protection is necessary but inevitably limited. Tools and structures of assistance to anticipation remain slightly developed. To manage repeated crisis, local authorities need to be able to base their policy against flood on prevention, warnings, post-crisis analysis and feedback from former experience. In this objective, after 3 years of test and improvement since 2003, the initiative Predict-Services was developped in South of France: it aims at helping communities and companies to face repeated flood crisis. The principle is to prepare emergency plans, to organize crisis management and reduce risks; to help and assist communities and companies during crisis to activate and adapt their emergency plans with enough of anticipation; and to analyse floods effects and improve emergency plans afterwards. In order to reduce risks, and to keep the benefits of such an initiative, local communities and companies have to maintain the awareness of risk of the citizens and employees. They also have to maintain their safety plans to keep them constantly operational. This is a part of the message relayed. Companies, Local communities, local government authorities and basin stakeholders are the decision makers. Companies and local communities have to involve themselves in the elaboration of safety plans. They are also completely involved in their activation that is their own responsability. This applies to other local government authorities, like districts one's and basin stakeholders, which participle in the financing community safety plans and adminitrative district which are responsible of the transmission of meteorological alert and of rescue actions. In the crossing of the géo-information stemming from the

  19. Risk Management for the International Space Station

    Science.gov (United States)

    Sebastian, J.; Brezovic, Philip

    2002-01-01

    The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

  20. Social Risk and the Management of MNCs

    DEFF Research Database (Denmark)

    Taarup Esbensen, Jacob

    2015-01-01

    Multinational companies (MNCs) are increasing being exposed to risk that originate from local communities in the business environment where they operate. The response has been to implement systems for stakeholder engagement by including social issues into their risk management systems. However......” systems, which are based on the capability to identify frames and sensemaking processes. This paper show how social risk management can be conventionalised using distinct theoretical domains taking its outset in a sociological perspective on risk, linking International Business (IB) risk management...

  1. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  2. Dynamic Management of Mutual Fund Advisory Contracts = Yatırım Fonu Anlaşmalarının Dinamik Yönetimi

    Directory of Open Access Journals (Sweden)

    Yaman Ö. ERZURUMLU

    2006-06-01

    Full Text Available The price of professional portfolio management provided by the mutual fund adviser depends not only on the fund characteristics but also on the fund objective, the adviser's portfolio related and management based decisions, and the portfolio performance. I analyze the advisory fee, using a survivorship bias free data set of 176 equity funds managed by 125 different advisers. Advisers benchmark the objective average but this benefit the shareholders only when the objective trend is descending. Advisers tend to reduce the cost of their marginal product through the use of derivatives or manipulate by engaging in soft dollar agreements. I find that the advisers actively manage the advisory fee contracts responding to the outcome of their management decisions. The advisory fee increases after voluntary fee reimbursement or if the adviser is not fully reimbursed for the compensation of independent directors and officers.

  3. The total theory about risk management

    International Nuclear Information System (INIS)

    Furuya, Shunsuke

    2003-01-01

    A general working procedure of risk management, some example of other countries, topics and problems in the future are described. A definition of risk, risk assessment, risk management process, setting of aim and definite policy are explained. As a fundamental way of thinking, risk is controlled by ALARP (As Low As Reasonably Practicable). The upper and lower limit of risk level is called as Quantitative Safety Goal and Target Level of Safety, respectively. These limits in the atomic power and airplane are decided. Evaluation of risk, countermeasure and practice are explained. For example, a permissible range of risk and practical use in England, U.S.A, Holland and Japan are stated. Recently, accountability risk, missing demand risk and control risk are important. (S.Y.)

  4. Development of computerized risk management tool

    International Nuclear Information System (INIS)

    Kil Yoo Kim; Mee Jung Hwang; Seung Cheol Jang; Sang Hoon Han; Tae Woon Kim

    1997-01-01

    The author describes the kinds of efforts for the development of computerized risk management tool; (1) development of a risk monitor, Risk Monster, (2) improvement of McFarm (Missing Cutsets Finding Algorithm for Risk Monitor) and finally (3) development of reliability database management system, KwDBMan. Risk Monster supports for plant operators and maintenance schedulers to monitor plant risk and to avoid high peak risk by rearranging maintenance work schedule. Improved McFarm significantly improved calculation speed of Risk Monster for the cases of supporting system OOS (Out Of Service). KwDBMan manages event data, generic data and CCF (Common Cause Failure) data to support Risk Monster as well as PSA tool, KIRAP (KAERI Integrated Reliability Analysis Package)

  5. The Management Advisory Committee of the Inspection Validation Centre seventh report

    International Nuclear Information System (INIS)

    1990-07-01

    The Management Advisory Committee of the Inspection Validation Centre (IVC/MAC) was set up to review the policy, scope, procedure and operation of the Inspection Validation Centre (IVC), to supervise its operation and to advise and report to the United Kingdom Atomic Energy Authority (UKAEA) appropriately. The IVC was established at the UKAEA Risley Laboratory, to validate the procedures, personnel and equipment proposed by Nuclear Electric for use in the ultrasonic inspection at various stages of the fabrication, erection and operation of the Sizewell 'B' Pressurized Water Reactor (PWR) reactor pressure vessel (RPV) and such other components as are identified by the utility. It is operated by the UKAEA to work as an independent organisation under contract to Nuclear Electric, and results are reported to Nuclear Electric together with the conclusions of the Centre in relation to the validation of individual techniques. At the meetings of the IVC/MAC, the progress on the manufacture of the pressure vessel is also outlined by the PWR Project Director. The vessel has now undergone the final stress relief and post-hydro inspection and is due to be delivered to the Sizewell site before the end of 1990. (author)

  6. Risk management method for small photovoltaic plants

    Directory of Open Access Journals (Sweden)

    Kirova Milena

    2016-09-01

    Full Text Available Risk management is necessary for achieving the goals of the organization. There are many methods, approaches, and instruments in the literature concerning risk management. However, these are often highly specialized and transferring them to a different field can prove difficult. Therefore, managers often face situations where they have no tools to use for risk management. This is the case with small photovoltaic plants (according to a definition by the Bulgarian State Energy and Water Regulatory Commission small applies to systems with a total installed power of 200 kWp. There are some good practices in the energy field for minimizing risks, but they offer only partial risk prevention and are not sufficient. Therefore a new risk management method needs to be introduced. Small photovoltaic plants offer plenty of advantages in comparison to the other renewable energy sources which makes risk management in their case more important. There is no classification of risks for the exploitation of small photovoltaic systems in the available literature as well as to what degree the damages from those risks could spread. This makes risk analysis and evaluation necessary for obtaining information which could aid taking decisions for improving risk management. The owner of the invested capital takes a decision regarding the degree of acceptable risk for his organization and it must be protected depending on the goals set. Investors in small photovoltaic systems need to decide to what degree the existing risks can influence the goals previously set, the payback of the investment, and what is the acceptable level of damages for the investor. The purpose of this work is to present a risk management method, which currently does not exist in the Bulgaria, so that the risks and the damages that could occur during the exploitation of small photovoltaic plants could be identified and the investment in such technology – justified.

  7. Role of NDT in risk management

    International Nuclear Information System (INIS)

    Porter, Jr. James F.

    2009-01-01

    Risk management is identifying and then managing threats that could severely affect or bring down a company. This involves reviewing the operations of the company to include the process, equipment, procedures and personnel. Potential threats are then identified including their probability of occurrence, and then taking appropriate actions to address the most likely threats. Traditionally, risk management was thought of as mostly getting the right insurance. However, this impression of risk management has changed dramatically. With the recent increase in rules and regulations and optimizing utilization of key resources, risk management is becoming a management practice that is as important as financial or facilities management. In ideal risk management, a prioritization process is followed whereby the risks with the greatest loss and greatest probability of occurring are handled first, and risks with lower probability of occurrence and lower loss are handled in descending order. In practice the process can be very difficult, and balancing between risks with a high probability of occurrence but lower loss versus a risk with high but lower probability of occurrence can often be mishandled. (author)

  8. Financial risk management of pharmacy benefits.

    Science.gov (United States)

    Saikami, D

    1997-10-01

    Financial risk management of pharmacy benefits in integrated health systems is explained. A managed care organization should assume financial risk for pharmacy benefits only if it can manage the risk. Horizontally integrated organizations often do not have much control over the management of drug utilization and costs. Vertically integrated organizations have the greatest ability to manage pharmacy financial risk; virtual integration may also be compatible. Contracts can be established in which the provider is incentivized or placed at partial or full risk. The main concerns that health plans have with respect to pharmacy capitation are formulary management and the question of who should receive rebates from manufacturers. The components needed to managed pharmacy financial risk depend on the type of contract negotiated. Health-system pharmacists are uniquely positioned to take advantage of opportunities opening up through pharmacy risk contracting. Functions most organizations must provide when assuming pharmacy financial risk can be divided into internal and external categories. Internally performed functions include formulary management, clinical pharmacy services and utilization management, and utilization reports for physicians. Functions that can be outsourced include claims processing and administration, provider- and customer support services, and rebates. Organizations that integrate the pharmacy benefit across the health care continuum will be more effective in controlling costs and improving outcomes than organizations that handle this benefit as separate from others. Patient care should not focus on payment mechanisms and unit costs but on developing superior processes and systems that improve health care.

  9. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  10. Risk management in a competitive electricity market

    International Nuclear Information System (INIS)

    Liu, Min; Wu, Felix F.

    2007-01-01

    In a competitive electricity market, it is necessary and important to develop an appropriate risk management scheme for trade with full utilization of the multi-market environment in order to maximize participants' benefits and minimize the corresponding risks. Based on the analyses to trading environments and risks in the electricity market, a layered framework of risk management for electric energy trading is proposed in this paper. Simulation results confirmed that trading among multiple markets is helpful to reduce the complete risk, and VaR provides a useful approach to judge whether the formed risk-control scheme is acceptable. (author)

  11. INVENTORY AND RISK MANAGEMENT: DECREASING DELIVERY RISK OF PURCHASERS

    Directory of Open Access Journals (Sweden)

    Grzegorz MICHALSKI

    2008-12-01

    Full Text Available The basic financial purpose of an enterprise is maximization of its value. Inventory management should also contribute to realization of this fundamental aim. The enterprise value maximization strategy is executed with a focus on risk and uncertainty. This article presents the consequences for the recipients firm that can result from operating risk that is related to delivery risk generated by the suppliers. The present article offers a method that uses portfolio management theory to choose the suppliers.

  12. Data Management in Metagenomics: A Risk Management Approach

    Directory of Open Access Journals (Sweden)

    Filipe Ferreira

    2014-07-01

    Full Text Available In eScience, where vast data collections are processed in scientific workflows, new risks and challenges are emerging. Those challenges are changing the eScience paradigm, mainly regarding digital preservation and scientific workflows. To address specific concerns with data management in these scenarios, the concept of the Data Management Plan was established, serving as a tool for enabling digital preservation in eScience research projects. We claim risk management can be jointly used with a Data Management Plan, so new risks and challenges can be easily tackled. Therefore, we propose an analysis process for eScience projects using a Data Management Plan and ISO 31000 in order to create a Risk Management Plan that can complement the Data Management Plan. The motivation, requirements and validation of this proposal are explored in the MetaGen-FRAME project, focused in Metagenomics.

  13. Overview of Risk Management for Engineered Nanomaterials

    International Nuclear Information System (INIS)

    Schulte, P A; Geraci, C L; Hodson, L L; Zumwalde, R D; Kuempel, E D; Murashov, V; Martinez, K F; Heidel, D S

    2013-01-01

    Occupational exposure to engineered nanomaterials (ENMs) is considered a new and challenging occurrence. Preliminary information from laboratory studies indicates that workers exposed to some kinds of ENMs could be at risk of adverse health effects. To protect the nanomaterial workforce, a precautionary risk management approach is warranted and given the newness of ENMs and emergence of nanotechnology, a naturalistic view of risk management is useful. Employers have the primary responsibility for providing a safe and healthy workplace. This is achieved by identifying and managing risks which include recognition of hazards, assessing exposures, characterizing actual risk, and implementing measures to control those risks. Following traditional risk management models for nanomaterials is challenging because of uncertainties about the nature of hazards, issues in exposure assessment, questions about appropriate control methods, and lack of occupational exposure limits (OELs) or nano-specific regulations. In the absence of OELs specific for nanomaterials, a precautionary approach has been recommended in many countries. The precautionary approach entails minimizing exposures by using engineering controls and personal protective equipment (PPE). Generally, risk management utilizes the hierarchy of controls. Ideally, risk management for nanomaterials should be part of an enterprise-wide risk management program or system and this should include both risk control and a medical surveillance program that assesses the frequency of adverse effects among groups of workers exposed to nanomaterials. In some cases, the medical surveillance could include medical screening of individual workers to detect early signs of work-related illnesses. All medical surveillance should be used to assess the effectiveness of risk management; however, medical surveillance should be considered as a second line of defense to ensure that implemented risk management practices are effective.

  14. Overview of Risk Management for Engineered Nanomaterials

    Science.gov (United States)

    Schulte, P. A.; Geraci, C. L.; Hodson, L. L.; Zumwalde, R. D.; Kuempel, E. D.; Murashov, V.; Martinez, K. F.; Heidel, D. S.

    2013-04-01

    Occupational exposure to engineered nanomaterials (ENMs) is considered a new and challenging occurrence. Preliminary information from laboratory studies indicates that workers exposed to some kinds of ENMs could be at risk of adverse health effects. To protect the nanomaterial workforce, a precautionary risk management approach is warranted and given the newness of ENMs and emergence of nanotechnology, a naturalistic view of risk management is useful. Employers have the primary responsibility for providing a safe and healthy workplace. This is achieved by identifying and managing risks which include recognition of hazards, assessing exposures, characterizing actual risk, and implementing measures to control those risks. Following traditional risk management models for nanomaterials is challenging because of uncertainties about the nature of hazards, issues in exposure assessment, questions about appropriate control methods, and lack of occupational exposure limits (OELs) or nano-specific regulations. In the absence of OELs specific for nanomaterials, a precautionary approach has been recommended in many countries. The precautionary approach entails minimizing exposures by using engineering controls and personal protective equipment (PPE). Generally, risk management utilizes the hierarchy of controls. Ideally, risk management for nanomaterials should be part of an enterprise-wide risk management program or system and this should include both risk control and a medical surveillance program that assesses the frequency of adverse effects among groups of workers exposed to nanomaterials. In some cases, the medical surveillance could include medical screening of individual workers to detect early signs of work-related illnesses. All medical surveillance should be used to assess the effectiveness of risk management; however, medical surveillance should be considered as a second line of defense to ensure that implemented risk management practices are effective.

  15. Model risk analysis for risk management and option pricing

    NARCIS (Netherlands)

    Kerkhof, F.L.J.

    2003-01-01

    Due to the growing complexity of products in financial markets, market participants rely more and more on quantitative models for trading and risk management decisions. This introduces a fairly new type of risk, namely, model risk. In the first part of this thesis we investigate the quantitative

  16. [Does clinical risk management require a structured conflict management?].

    Science.gov (United States)

    Neumann, Stefan

    2015-01-01

    A key element of clinical risk management is the analysis of errors causing near misses or patient damage. After analyzing the causes and circumstances, measures for process improvement have to be taken. Process management, human resource development and other established methods are used. If an interpersonal conflict is a contributory factor to the error, there is usually no structured conflict management available which includes selection criteria for various methods of conflict processing. The European University Viadrina in Frankfurt (Oder) has created a process model for introducing a structured conflict management system which is suitable for hospitals and could fill the gap in the methodological spectrum of clinical risk management. There is initial evidence that a structured conflict management reduces staff fluctuation and hidden conflict costs. This article should be understood as an impulse for discussion on to what extent the range of methods of clinical risk management should be complemented by conflict management.

  17. ANALYSIS AND MANAGEMENT RISK IN INTERNATIONAL AFFAIRS

    OpenAIRE

    Lăpăduşi Mihaela Loredana,; Căruntu Constantin

    2009-01-01

    The risk is one of the most controversial issues for all persons involved both in domestic and international world economic affairs. The need to analyze, understand and effectively manage risk is growing, the ultimate aim being to obtain a higher degree of successThe risk means exposure to an uncertain future, the opportunity to face danger or suffering a loss ( "Risk - possibility of loss or injury", Webster's, 1995) or the chance that things go wrong ( "Risk is the change that something wil...

  18. Managing flood risks in the Mekong Delta

    NARCIS (Netherlands)

    Hoang, Long Phi; Biesbroek, Robbert; Tri, Van Pham Dang; Kummu, Matti; Vliet, van Michelle T.H.; Leemans, Rik; Kabat, Pavel; Ludwig, Fulco

    2018-01-01

    Climate change and accelerating socioeconomic developments increasingly challenge flood-risk management in the Vietnamese Mekong River Delta—a typical large, economically dynamic and highly vulnerable delta. This study identifies and addresses the emerging challenges for flood-risk management.

  19. Hog Producers' Risk Management Attitudes and Desire for Additional Risk Management Education

    OpenAIRE

    Patrick, George F.; Peiter, Amy J.; Knight, Thomas O.; Coble, Keith H.; Baquet, Alan E.

    2007-01-01

    Hog producers in Indiana and Nebraska were surveyed about sources of risk, effectiveness of risk management strategies, and prior participation in and desire for additional risk management education. Ownership of hogs by the producer, size of the operation, and age did have significant effects on ratings of both sources of risk and effectiveness of risk management strategies. Probit analysis found age, prior attendance, knowledge and prior use of the tool, level of integration, and concern ab...

  20. Large dams and risk management

    International Nuclear Information System (INIS)

    Cazelais, N.

    2003-01-01

    In July 1996, Quebec's Saguenay region was subjected to intensive rainfall which caused severe floods and uncontrolled release of several reservoirs, resulting in extensive damage to dam structures and reservoirs. The probability of occurrence for that disaster was 1:10,000. Following the disaster, the Quebec government established a dam management body entitled the Commission scientifique et technique sur la gestion des barrages, which pointed out several safety shortcomings of existing dams. Many were either very old or had undergone significant function change without being subsequently re-evaluated. A report by the Commission stated that damage following the floods could have been limited if the design and operating standards of the dams had been more stringent. A Dam Safety Act was adopted by the Quebec National Assembly on May 30, 2000 following recommendations to retain safer structures. The Act demands regular reporting of operating procedures. Seismic activity was noted as being a topic that requires in-depth examination since Quebec's St. Lawrence Valley, particularly the Charlevoix region, is one of Canada's largest seismic zones. The other is on the west coast in British Columbia. Earthquakes in Quebec are less intense than the ones in British Columbia, but they have higher frequency content which exerts a quasi-resonance wave effect which impacts roads, bridges, buildings and hydroelectric generating facilities. Hydro-Quebec is a public utility which owns 563 retaining structures, of which 228 are ranked as large dams that measure more than 15 metres high, 400 metres long and with a reservoir capacity of more than 1 million cubic metres of water. Hydro-Quebec addresses hydrological, seismic, technological and human risks through a dam safety procedure that includes structured plans for choosing best alternatives through staged exercises. Hazard levels are minimized through the adoption of emergency, prevention and alleviation measures. The utility