WorldWideScience

Sample records for rising electricity costs

  1. Cost-reflective electricity pricing: Consumer preferences and perceptions

    International Nuclear Information System (INIS)

    Hall, Nina L.; Jeanneret, Talia D.; Rai, Alan

    2016-01-01

    In Australia, residential electricity peak demand has risen steeply in recent decades, leading to higher prices as new infrastructure was needed to satisfy demand. One way of limiting further infrastructure-induced retail price rises is via ‘cost-reflective’ electricity network pricing that incentivises users to shift their demand to non-peak periods. Empowering consumers with knowledge of their energy usage is critical to maximise the potential benefits of cost-reflective pricing. This research consulted residential electricity consumers in three Australian states on their perceptions and acceptance of two cost-reflective pricing scenarios (Time-of-Use and Peak Capacity pricing) and associated technologies to support such pricing (smart meters, in-home displays and direct load control devices). An energy economist presented information to focus groups on the merits and limitations of each scenario, and participants’ views were captured. Almost half of the 53 participants were agreeable to Time-of-Use pricing, but did not have a clear preference for Peak Capacity pricing, where the price was based on the daily maximum demand. Participants recommended further information to both understand and justify the potential benefits, and for technologies to be introduced to enhance the pricing options. The results have implications for utilities and providers who seek to reduce peak demand. - Highlights: •Electricity price rises can be limited by ‘cost-reflective’ pricing. •We consulted residential electricity consumers on Time-of-Use and Peak Capacity pricing. •Understanding of peak electricity demand must increase to enable demand shift. •Interactive website could enable consumers to evaluate pricing options. •Smart meter adoption may increase if voluntary and includes an in-home display.

  2. High and rising health care costs.

    Science.gov (United States)

    Ginsburg, Paul B

    2008-10-01

    The U.S. is spending a growing share of the GDP on health care, outpacing other industrialized countries. This synthesis examines why costs are higher in the U.S. and what is driving their growth. Key findings include: health care inefficiency, medical technology and health status (particularly obesity) are the primary drivers of rising U.S. health care costs. Health payer systems that reward inefficiencies and preempt competition have impeded productivity gains in the health care sector. The best evidence indicates medical technology accounts for one-half to two-thirds of spending growth. While medical malpractice insurance and defensive medicine contribute to health costs, they are not large enough factors to significantly contribute to a rise in spending. Research is consistent that demographics will not be a significant factor in driving spending despite the aging baby boomers.

  3. An analysis of electric utility embedded power supply costs

    International Nuclear Information System (INIS)

    Kahal, M.; Brown, D.

    1998-01-01

    There is little doubt that for the vast majority of electric utilities the embedded costs of power supply exceed market prices, giving rise to the stranded cost problem. Beyond that simple generalization, there are a number of crucial questions, which this study attempts to answer. What are the regional patterns of embedded cost differences? To what extent is the cost problem attributable to nuclear power? How does the cost of purchased power compare to the cost of utility self-generation? What is the breakdown of utility embedded generation costs between operating costs - which are potentially avoidable--and ownership costs, which by definition are ''sunk'' and therefore not avoidable? How will embedded generation costs and market prices compare over time? These are the crucial questions for states as they address retail-restructuring proposal. This study presents an analysis of generation costs, which addresses these key questions. A computerized costing model was developed and applied using FERC Form 1 data for 1995. The model analyzed embedded power supply costs (i.e.; self-generation plus purchased power) for two groups of investor-owned utilities, 49 non-nuclear vs. 63 nuclear. These two subsamples represent substantially the entire US investor-owned electric utility industry. For each utility, embedded cost is estimated both at busbar and at meter

  4. Integrating conservation costs into sea level rise adaptive conservation prioritization

    Directory of Open Access Journals (Sweden)

    Mingjian Zhu

    2015-07-01

    Full Text Available Biodiversity conservation requires strategic investment as resources for conservation are often limited. As sea level rises, it is important and necessary to consider both sea level rise and costs in conservation decision making. In this study, we consider costs of conservation in an integrated modeling process that incorporates a geomorphological model (SLAMM, species habitat models, and conservation prioritization (Zonation to identify conservation priorities in the face of landscape dynamics due to sea level rise in the Matanzas River basin of northeast Florida. Compared to conservation priorities that do not consider land costs in the analysis process, conservation priorities that consider costs in the planning process change significantly. The comparison demonstrates that some areas with high conservation values might be identified as lower priorities when integrating economic costs in the planning process and some areas with low conservation values might be identified as high priorities when considering costs in the planning process. This research could help coastal resources managers make informed decisions about where and how to allocate conservation resources more wisely to facilitate biodiversity adaptation to sea level rise.

  5. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  6. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  7. Nuclear costs: why do they keep rising?

    International Nuclear Information System (INIS)

    MacKerron, Gordon

    1992-01-01

    Nuclear power has performed badly in recent years as a new investment everywhere except Japan and Korea. This has mainly been for orthodox financial and economic reasons. Among the factors contributing to this loss of competitiveness, persistently rising real capital costs have been particularly important. While the nuclear industry has believed it could control and reduce capital costs, increasing regulatory stringency has made designs more complex and correspondingly more costly. These cost increasing factors have far outweighed traditional cost reducing factors (like learning). The only lasting way to meet increasing stringency in safety at acceptably low cost is likely to be the development of new and simpler reactor designs. (author)

  8. Electricity costs in liberalized market

    International Nuclear Information System (INIS)

    Barkans, J.; Junghans, G.

    2006-01-01

    In the liberalized electricity market the flexible demand determines the operation of power plants. Under market conditions the producers are forced to compete, and their power plants are normally loaded in order of increasing prices. The electricity costs consist of fixed and variable components, and the competition among producers simulates minimization of both the components. Considering the fixed costs (including maintenance, depreciation, capital costs and other permanent costs not depending on production) to be known, the total electricity costs in different operating conditions are based on the economic characteristics and the equipment load of a power plant. The paper describes the method for determination of electricity costs for condensing thermal power plants with permanent steam take-off for regeneration purposes and adjustable steam take-off for the needs of local heat energy consumers. The marginal costs for CHP plants are determined considering a number of different steam take-off from a turbine. At the electricity cost determination, auxiliary services also are taken into account. These can be reduced by adjusting the rotational speed of electric motors. The paper also shows how to determine the electricity costs for gas turbines, combined cycle gas turbines, and nuclear power plants. The position of hydro power plants among other PPs in the free market is also analysed. (authors)

  9. The electricity bill may rise by 30% between now and 2017, according to the CRE

    International Nuclear Information System (INIS)

    Anon.

    2013-01-01

    The CRE (French Regulatory Commission for Electricity) expects a rise of 30% in the electricity price for households in the next five years in France, the rise would only be of 16% for enterprises. The study shows that one third of this rise is due to the contribution to the public service of electricity whose main purpose is to finance the development of renewable energies. The rise will also cover the investments that have to be made in the power grid and in the means of production of electricity. (A.C.)

  10. Impacts of rising air temperatures on electric transmission ampacity and peak electricity load in the United States

    Science.gov (United States)

    Bartos, Matthew; Chester, Mikhail; Johnson, Nathan; Gorman, Brandon; Eisenberg, Daniel; Linkov, Igor; Bates, Matthew

    2016-11-01

    Climate change may constrain future electricity supply adequacy by reducing electric transmission capacity and increasing electricity demand. The carrying capacity of electric power cables decreases as ambient air temperatures rise; similarly, during the summer peak period, electricity loads typically increase with hotter air temperatures due to increased air conditioning usage. As atmospheric carbon concentrations increase, higher ambient air temperatures may strain power infrastructure by simultaneously reducing transmission capacity and increasing peak electricity load. We estimate the impacts of rising ambient air temperatures on electric transmission ampacity and peak per-capita electricity load for 121 planning areas in the United States using downscaled global climate model projections. Together, these planning areas account for roughly 80% of current peak summertime load. We estimate climate-attributable capacity reductions to transmission lines by constructing thermal models of representative conductors, then forcing these models with future temperature projections to determine the percent change in rated ampacity. Next, we assess the impact of climate change on electricity load by using historical relationships between ambient temperature and utility-scale summertime peak load to estimate the extent to which climate change will incur additional peak load increases. We find that by mid-century (2040-2060), increases in ambient air temperature may reduce average summertime transmission capacity by 1.9%-5.8% relative to the 1990-2010 reference period. At the same time, peak per-capita summertime loads may rise by 4.2%-15% on average due to increases in ambient air temperature. In the absence of energy efficiency gains, demand-side management programs and transmission infrastructure upgrades, these load increases have the potential to upset current assumptions about future electricity supply adequacy.

  11. The Full Costs of Electricity Provision

    International Nuclear Information System (INIS)

    Horst Keppler, Jan; Rothwell, Geoffrey; Cometto, Marco; Deffrennes, Marc; Iracane, Daniel; Ha, Jaejoo; Paillere, Henri; ); Aspelund, Karl; Aydil, Ismail; ); Berthelemy, Michel; Devezeaux De Lavergne, Jean-Guy; Burtin, Alain; Crozat, Matthew P.; D'Haeseleer, William; Friedrich, Reiner; Gonzalez Jimenez, Antonio; Hirschberg, Stefan; Kiso, Jan-Ole; ); Lee, Manki; Le Masne, Dominique; ); Lundmark, Roger J.; Neumann, Doris; ); Politis, Savvas; ); Prin, Coralie; Skonieczny, Olgierd; Voss, Alfred

    2018-01-01

    Electricity provision touches upon every facet of life in OECD and non-OECD countries alike, and choosing how this electricity is generated - whether from fossil fuels, nuclear energy or renewables - affects not only economic outcomes but individual and social well-being in the broader sense. Research on the overall costs of electricity is an ongoing effort, as only certain costs of electricity provision are perceived directly by producers and consumers. Other costs, such as the health impacts of air pollution, damage from climate change or the effects on the electricity system of small-scale variable production are not reflected in market prices and thus diminish well-being in unaccounted for ways. Accounting for these social costs in order to establish the full costs of electricity provision is difficult, yet such costs are too important to be disregarded in the context of the energy transitions currently under way in OECD and NEA countries. This report draws on evidence from a large number of studies concerning the social costs of electricity and identifies proven instruments for internalising them so as to improve overall welfare. The results outlined in the report should lead to new and more comprehensive research on the full costs of electricity, which in turn would allow policy makers and the public to make better informed decisions along the path towards fully sustainable electricity systems

  12. Cost Conscious: Incentive and Discount Programs Help Students Meet the Rising Cost of a Community College Education

    Science.gov (United States)

    Ullman, Ellen

    2013-01-01

    Aware that rising costs could force some community colleges to compromise their long-standing open-door policies, administrators have put in place programs and incentives to offset the higher price of the average community college education. This article features ideas and programs to help struggling community colleges cope with rising costs such…

  13. Realistic generation cost of solar photovoltaic electricity

    International Nuclear Information System (INIS)

    Singh, Parm Pal; Singh, Sukhmeet

    2010-01-01

    Solar photovoltaic (SPV) power plants have long working life with zero fuel cost and negligible maintenance cost but requires huge initial investment. The generation cost of the solar electricity is mainly the cost of financing the initial investment. Therefore, the generation cost of solar electricity in different years depends on the method of returning the loan. Currently levelized cost based on equated payment loan is being used. The static levelized generation cost of solar electricity is compared with the current value of variable generation cost of grid electricity. This improper cost comparison is inhibiting the growth of SPV electricity by creating wrong perception that solar electricity is very expensive. In this paper a new method of loan repayment has been developed resulting in generation cost of SPV electricity that increases with time like that of grid electricity. A generalized capital recovery factor has been developed for graduated payment loan in which capital and interest payment in each installment are calculated by treating each loan installment as an independent loan for the relevant years. Generalized results have been calculated which can be used to determine the cost of SPV electricity for a given system at different places. Results show that for SPV system with specific initial investment of 5.00 cents /kWh/year, loan period of 30 years and loan interest rate of 4% the levelized generation cost of SPV electricity with equated payment loan turns out to be 28.92 cents /kWh, while the corresponding generation cost with graduated payment loan with escalation in annual installment of 8% varies from 9.51 cents /kWh in base year to 88.63 cents /kWh in 30th year. So, in this case, the realistic current generation cost of SPV electricity is 9.51 cents /kWh and not 28.92 cents /kWh. Further, with graduated payment loan, extension in loan period results in sharp decline in cost of SPV electricity in base year. Hence, a policy change is required

  14. Assessing the full costs of electricity

    International Nuclear Information System (INIS)

    Keppler, Jan Horst

    2016-01-01

    For decades, economists, energy specialists and policy-makers have been satisfied with assessing the comparative costs of electricity generation on the basis of discounted average costs over the lifetime and the total output of a generating plant. As a standardised form of cost-benefit accounting (CBA), these levelised costs of electricity (LCOE) indicate the required expenditures in terms of capital, fuel, and operations and management (O and M), adjusted for their incidence in time or the different technology options per unit of output (i.e. a MWh of electricity). This straightforward, transparent and comparatively simple metric worked well in a context of regulated markets where generators were centrally dispatched according to system requirements, tariffs were set by regulators and load factors could be predicted with confidence. In order to satisfy a given demand for electricity, the technology with the lowest LCOE was usually chosen, thus minimising the costs of the electricity system. Nuclear energy thus competed with hydro, where available, and coal and gas on the basis of their respective capital, labour and fuel costs at the level of the individual plant. (author)

  15. LIFE Cost of Electricity, Capital and Operating Costs

    International Nuclear Information System (INIS)

    Anklam, T.

    2011-01-01

    Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

  16. Levelised cost of electricity 2015

    International Nuclear Information System (INIS)

    Stolzenberger, Christian; Then, Oliver

    2015-01-01

    The electricity business is currently subject to dynamic and permanent change that is driven by innovation, learning curves and modifications of the electricity generation mix. A new edition of the ''Levelised Cost of Electricity (LCOE)'' was drafted under these circumstances. The fundamental idea behind the LCOE is to calculate the yearly average costs of building and operating plants and to compare these with the average energy generated each year.

  17. Levelised cost of electricity 2015

    Energy Technology Data Exchange (ETDEWEB)

    Stolzenberger, Christian; Then, Oliver [VGB PowerTech e.V., Essen (Germany)

    2015-07-01

    The electricity business is currently subject to dynamic and permanent change that is driven by innovation, learning curves and modifications of the electricity generation mix. A new edition of the ''Levelised Cost of Electricity (LCOE)'' was drafted under these circumstances. The fundamental idea behind the LCOE is to calculate the yearly average costs of building and operating plants and to compare these with the average energy generated each year.

  18. Effect of rising time of rectangular pulse on inactivation of staphylococcus aureus by pulsed electric field

    Science.gov (United States)

    Zhang, Ruobing; Liang, Dapeng; Zheng, Nanchen; Xiao, Jianfu; Mo, Mengbin; Li, Jing

    2013-03-01

    Pulsed electric field (PEF) is a novel non-thermal food processing technology that involves the electric discharge of high voltage short pulses through the food product. In PEF study, rectangular pulses are most commonly used for inactivating microorganisms. However, little information is available on the inactivation effect of rising time of rectangular pulse. In this paper, inactivation effects, electric field strength, treatment time and conductivity on staphylococcus aureus inactivation were investigated when the pulse rising time is reduced from 2.5 μs to 200 ns. Experimental results showed that inactivation effect of PEF increased with electric field strength, solution conductivity and treatment time. Rising time of the rectangular pulse had a significant effect on the inactivation of staphylococcus aureus. Rectangular pulses with a rising time of 200 ns had a better inactivation effect than that with 2 μs. In addition, temperature increase of the solution treated by pulses with 200 ns rising time was lower than that with 2 μs. In order to obtain a given inactivation effect, treatment time required for the rectangular pulse with 200 ns rise time was shorter than that with 2 μs.

  19. Effect of rising time of rectangular pulse on inactivation of staphylococcus aureus by pulsed electric field

    International Nuclear Information System (INIS)

    Zhang, Ruobing; Liang, Dapeng; Xiao, Jianfu; Mo, Mengbin; Li, Jing; Zheng, Nanchen

    2013-01-01

    Pulsed electric field (PEF) is a novel non-thermal food processing technology that involves the electric discharge of high voltage short pulses through the food product. In PEF study, rectangular pulses are most commonly used for inactivating microorganisms. However, little information is available on the inactivation effect of rising time of rectangular pulse. In this paper, inactivation effects, electric field strength, treatment time and conductivity on staphylococcus aureus inactivation were investigated when the pulse rising time is reduced from 2.5 μs to 200 ns. Experimental results showed that inactivation effect of PEF increased with electric field strength, solution conductivity and treatment time. Rising time of the rectangular pulse had a significant effect on the inactivation of staphylococcus aureus. Rectangular pulses with a rising time of 200 ns had a better inactivation effect than that with 2 μs. In addition, temperature increase of the solution treated by pulses with 200 ns rising time was lower than that with 2 μs. In order to obtain a given inactivation effect, treatment time required for the rectangular pulse with 200 ns rise time was shorter than that with 2 μs.

  20. The projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.; Keppler, J. H.

    2010-10-01

    This paper describes the outcomes from the joint report between the Nuclear Energy Agency and the International Energy Agency of the OECD on the projected costs of generating electricity. The study contains data on electricity generating costs for almost 200 power plants provided by 17 OECD member countries, 4 non-OECD countries and 4 industrial companies or industry organisations. The paper presents the projected costs of generating electricity calculated according to common methodological rules on the basis of the data provided by participating countries and organisations. Data were received for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. Cost estimates were also provided for combined heat and power plants, as well as for coal plants that include carbon capture. As in previous studies of the same series, all costs and benefits were discounted or capitalised to the date of commissioning in order to calculate the state of the electricity costs per MWh, based on plant operating lifetime data. In addition, the paper contains a discussion of a number of factors affecting the cost of capital, the outlook for carbon capture and storage and the working of electricity markets. (Author)

  1. External costs of electricity

    International Nuclear Information System (INIS)

    Rabl, A.; Spadaro, J.V.

    2005-01-01

    This article presents a synthesis of the ExternE project (External costs of Energy) of the European community about the external costs of power generation. Pollution impacts are calculated using an 'impact pathways' analysis, i.e. an analysis of the emission - dispersion - dose-response function - cost evaluation chain. Results are presented for different fuel cycles (with several technological variants) with their confidence intervals. The environmental impact costs are particularly high for coal: for instance, in France, for coal-fired power plants it is of the same order as the electricity retail price. For natural gas, this cost is about a third of the one for coal. On the contrary, the environmental impact costs for nuclear and renewable energies are low, typically of few per cent of the electricity price. The main part of these costs corresponds to the sanitary impacts, in particular the untimely mortality. In order to avoid any controversy about the cost evaluation of mortality, the reduction of the expectation of life due to the different fuel cycles is also indicated and the risks linked with nuclear energy are presented using several comparisons. (J.S.)

  2. Rising natural gas and electricity prices in the Netherlands

    International Nuclear Information System (INIS)

    Roggen, M.

    2004-01-01

    In a free market, the price for electricity rises rather than falls. And as for the gas price, the consumer will be facing strong fluctuations. For that matter, it is only slightly connected with the liberalization of the market. An employee of Roland Berger Strategy Consultants has delved deeply into the matter, down to the euro [nl

  3. Population Aging in Iran and Rising Health Care Costs

    Directory of Open Access Journals (Sweden)

    Mohammad Mirzaie

    2017-09-01

    Conclusion Based on the results of this research, it can be said that people throughout their life cycle always allocate a percentage of their total spending to health care costs, but the percentage of this allocation is different at different ages. In a way the demand for healthcare costs increases with aging, it rises significantly in the old age. At the macro level, due to an increase in the percentage of elderly in the population over the next decade, there will also be an increase in the share of health care costs.

  4. The effects of rising energy costs and transportation mode mix on forest fuel procurement costs

    International Nuclear Information System (INIS)

    Rauch, Peter; Gronalt, Manfred

    2011-01-01

    Since fossil fuels have been broadly recognized as a non-renewable energy source that threatens the climate, sustainable and CO 2 neutral energy sources - such as forest fuels - are being promoted in Europe, instead. With the expeditiously growing forest fuel demand, the strategic problem of how to design a cost-efficient distribution network has evolved. This paper presents an MILP model, comprising decisions on modes of transportation and spatial arrangement of terminals, in order to design a forest fuel supply network for Austria. The MILP model is used to evaluate the impacts of rising energy costs on procurement sources, transport mix and procurement costs on a national scale, based on the example of Austria. A 20% increase of energy costs results in a procurement cost increase of 7%, and another 20% increase of energy costs would have similar results. While domestic waterways become more important as a result of the first energy cost increase, rail only does so after the second. One way to decrease procurement costs would be to reduce the share of empty trips with truck and trailer. Reducing this share by 10% decreases the average procurement costs by up to 20%. Routing influences the modal split considerably, and the truck transport share increases from 86% to 97%, accordingly. Increasing forest fuel imports by large CHPs lowers domestic competition and also enables smaller plants to cut their procurement costs. Rising forest fuel imports via ship will not significantly decrease domestic market shares, but they will reduce procurement costs considerably. (author)

  5. Electric fields effect on the rise of single bubbles during boiling

    International Nuclear Information System (INIS)

    Siedel, Samuel; Cioulachtjian, Serge; Bonjour, Jocelyn

    2009-01-01

    An experimental study of saturated pool boiling on a single artificial nucleation site without and with the application of an electric field on the boiling surface has been conducted. N-pentane is boiling on a copper surface and is recorded with a high speed camera providing high quality pictures and movies. The accuracy of the visualization allowed establishing an experimental bubble growth law from a large number of experiments. This law shows that the evaporation rate is decreasing during the bubble growth, and underlines the importance of liquid motion induced by the preceding bubble. Bubble rise is therefore studied: once detached, bubbles accelerate vertically until reaching a maximum velocity in good agreement with a correlation from literature. The bubbles then turn to another direction. The effect of applying an electric field on the boiling surface in finally studied. In addition to changes of the bubble shape, changes are also shown in the liquid plume and the convective structures above the surface. Lower maximum rising velocities were measured in the presence of electric fields, especially with a negative polarity. (author)

  6. The Effects of Rising Interest Rates on Electric Utility Stock Prices: Regulatory Considerations and Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Kihm, Steve [Seventhwave, Madison, WI (United States); Satchwell, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Cappers, Peter [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-26

    This technical brief identifies conditions under which utility regulators should consider implementing policy approaches that seek to mitigate negative outcomes due to an increase in interest rates. Interest rates are a key factor in determining a utility’s cost of equity and investors find value when returns exceed the cost of equity. Through historical observations of periods of rising and falling interest rates and application of a pro forma financial tool, we identify the key drivers of utility stock valuations and estimate the degree to which those valuations might be affected by increasing interest rates.3 We also analyze the efficacy of responses by utility regulators to mitigate potential negative financial impacts. We find that regulators have several possible approaches to mitigate a decline in value in an environment of increasing interest rates, though regulators must weigh the tradeoffs of improving investor value with potential increases in customer costs. Furthermore, the range of approaches reflects today’s many different electric utility regulatory models and regulatory responses to a decline in investor value will fit within state-specific models.

  7. Internalising external costs of electricity and heat production in a municipal energy system

    International Nuclear Information System (INIS)

    Holmgren, Kristina; Amiri, Shahnaz

    2007-01-01

    Both energy supply and waste treatment give rise to negative effects on the environment, so-called external effects. In this study, monetary values on external costs collected from the EU's ExternE project are used to evaluate inclusion of these costs in comparison with an energy utility perspective including present policy instruments. The studied object is a municipal district heating system with a waste incineration plant as the base supplier of heat. The evaluation concerns fuels used for heat production and total electricity production, for scenarios with external costs included and for a scenario using the present policy instrument. Impacts of assumptions on marginal power producers (coal or natural gas power plants) are investigated, since locally produced electricity is assumed to replace marginal power and thus is credited for the avoided burden. Varying levels of external costs for carbon dioxide emissions are analysed. The method used is an economic optimisation model, MODEST. The conclusion is that present policy instruments are strong incentives for cogeneration, even when external costs are included. Waste is fully utilised in all scenarios. In cases where coal is the marginal power producer, more electricity is produced; when natural gas is the marginal power producer, less is produced. There are several uncertainties in the data for external costs, both methodological and ethical. In the ExternE data, not all environmental impacts are included. For waste incineration, ashes are not included, and another difficulty is how to treat the avoided burden of other waste treatment methods

  8. Economic costs of electricity production in Poland

    International Nuclear Information System (INIS)

    Beeldman, M.; Solinski, J.

    1994-02-01

    This study presents a methodology for the calculation of the economic costs of the production of electricity. This methodology is applied to assess electricity production cost in Poland by type of power station for the years 1995 and 2000. In addition, an overview is presented of the methods used by the OECD countries, particularly in the Netherlands. The main conclusions of the study are: 1) the real economic costs to generate electricity in Poland are about two times higher compared with the traditional book-keeping data; 2) the investment costs will become the most important cost component in the near future; and 3) there are considerables differences in production cost per kWh for the different types of power plants in Poland. 4 appendices, 14 refs

  9. Projected costs of generating electricity

    International Nuclear Information System (INIS)

    2005-01-01

    Previous editions of Projected Costs of Generating Electricity have served as the reference in this field for energy policy makers, electricity system analysts and energy economists. The study is particularly timely in the light of current discussions of energy policy in many countries. The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today and considered by participating countries as candidates for commissioning by 2010-2015 or earlier. Investors and other decision makers will also need to take the full range of other factors into account (such as security of supply, risks and carbon emissions) when selecting an electricity generation technology. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut ''winner''. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. An appendix to the report provides country statements on generation technologies and costs. Previous studies in the series were published in 1983, 1986, 1990, 1993 and 1998. (author)

  10. Projected cost comparison of nuclear electricity

    International Nuclear Information System (INIS)

    Juhn, P.E.; Hu, C.W.

    2000-01-01

    Comparison of electricity generation costs has been done in the late years through a large co-operation between several organisations. The studies are aiming to provide reliable comparison of electricity generating costs of nuclear and conventional base load power plants. This paper includes the result of the joint IAEA/OECD study published in 1997. (author)

  11. Wind turbine cost of electricity and capacity factor

    International Nuclear Information System (INIS)

    Cavallo, A.J.

    1995-01-01

    Wind turbines are currently designed to minimize the cost of electricity at the wind turbine (the busbar cost) in a given wind regime, ignoring constraints on the capacitor factor (the ratio of the average power output to the maximum power output). The trade-off between these two quantities can be examined in a straightforward fashion; it is found that the capacitor factor can be increased by a factor of 1.3 above its value at the cost minimum for a 10 percent increase in the cost of electricity. This has important implications for the large scale integration of wind electricity on utility grids where the cost of transmission and storage may be a significant fraction of the cost of delivered electricity. (Author)

  12. The external costs of electricity

    International Nuclear Information System (INIS)

    Rabl, A.; Spadaro, J.V.

    2001-01-01

    This article presents an overview of the ExtrenE project (external costs of electricity) of the European Commission (EC). The damage caused by pollution has been calculated through analyses of the impact pathways which involve an analysis of the emission - dispersion - dose-response function - monetary estimation chain. The results are introduced for various cycles of combustible fuels (with several technological variants), indicating the confidence intervals. The cost of the damage is particularly high for coal. For example, for the coal-fired power stations in France (with the emission levels of 1995) it is approximately equal to the sales price of electricity. For natural gas, the cost of damage is approximately one-third that of coal. On the other hand, the damage costs for nuclear fuel and most forms of renewable energy are low, at a maximum just a few percent of the electricity price. The greatest part of these costs arises from health impact, particularly premature death. In order to avoid the controversy inherent in making a monetary assessment of mortality, especially if this is imposed upon future generations, the reduction in life expectancy due to the various combustible cycles is also indicated and the risks of nuclear energy are put into perspective via several comparisons. (authors)

  13. Life-cycle private costs of hybrid electric vehicles in the current Chinese market

    International Nuclear Information System (INIS)

    Lin, Chengtao; Wu, Tian; Ou, Xunmin; Zhang, Qian; Zhang, Xu; Zhang, Xiliang

    2013-01-01

    Understanding the life-cycle private cost (LCPC) of the hybrid electric vehicle (HEV) is important for market feasibility analysis. An HEV LCPC model was established to evaluate HEV market prospects in China compared with traditional internal combustion engine vehicles (ICEV). The Kluger HV, a full-hybrid HEV sports utility vehicle (SUV), aimed at the Chinese market, was simulated as the 2010 model's technology details were well publicized. The LCPC of the Kluger HV was roughly the same (about 1.06 times) as that of its comparable ICEV (Highlander SUV). This aligns with other compact and midsize HEV cars (e.g., Toyota Prius, Honda Civic and Toyota Camry HEV) in China. With oil prices predicted to rise in the long-term, the advantage of HEVs energy saving will partly compensate the high manufacturing costs associated with their additional motor/battery components. Besides supporting technology development, enabling policy should be implemented to introduce HEV technology into taxi fleets and business cars. This technology's cost-competitiveness, compared with traditional ICEVs, is advantageous for these higher mileage vehicles. - Highlights: ► A model is set up to evaluate the life-cycle private cost of HEVs. ► Life-cycle private costs of HEVs are higher than conventional cars in China. ► HEVs become competitive when the oil price rises

  14. Rising to the challenge - the changing face of Nuclear Electric

    International Nuclear Information System (INIS)

    Hawley, R.

    1994-01-01

    When the electricity generation industry in the United Kingdom was privatised in 1989, the Government decided to withdraw the nuclear generating capacity from the programme. Nuclear power's poor track record on construction, operating and production costs and apparently crippling liabilities for decommissioning and radioactive waste management made it an unlikely success on the financial markets. Nuclear Electric was then formed, a public limited company, wholly owned by the Government to run England's and Wales' nuclear power industry. In four years since then the management and staff of Nuclear Electric have worked hard to improve performance; output has risen, costs are down and productivity has doubled. The Sizewell B power station has been completed remarkably ahead of time and within budget. It is argued that, with further improvements, Nuclear Electric may also be profitably privatised in the future should the Government wish it. (UK)

  15. A minimum achievable PV electrical generating cost

    International Nuclear Information System (INIS)

    Sabisky, E.S.

    1996-01-01

    The role and share of photovoltaic (PV) generated electricity in our nation's future energy arsenal is primarily dependent on its future production cost. This paper provides a framework for obtaining a minimum achievable electrical generating cost (a lower bound) for fixed, flat-plate photovoltaic systems. A cost of 2.8 $cent/kWh (1990$) was derived for a plant located in Southwestern USA sunshine using a cost of money of 8%. In addition, a value of 22 $cent/Wp (1990$) was estimated as a minimum module manufacturing cost/price

  16. Australian retail electricity prices: Can we avoid repeating the rising trend of the past?

    International Nuclear Information System (INIS)

    Graham, Paul W.; Brinsmead, Thomas; Hatfield-Dodds, Steve

    2015-01-01

    After a stable or declining real trend that persisted for more than half a century, Australian retail electricity prices have experienced a substantial increase, in real terms, since 2007. This has mainly been driven by increases in the cost of electricity distribution and to a lesser degree in the cost of electricity generation. Reducing greenhouse gas emissions, which is a bipartisan political goal in Australia, will likely deliver further increases in generation costs due to the expected higher cost of low emission technology. Participating in global negotiations on emission reduction targets and designing efficient policy mechanisms have been a major focus of governments over the last several decades. In contrast, managing distribution system costs has received less attention. While there were a number of factors which drove historical increases in distribution costs, management of peak demand growth could help contain or reduce the extent to which consumers, particularly households, experience further increases in distribution costs. The paper demonstrates how different combinations of carbon price and peak demand scenarios could impact future residential and industrial retail electricity prices to 2050 and discusses some behavioural and technological solutions to manage peak demand and potential barriers to their deployment. - Highlights: • We identify the causes of the increase in Australian retail electricity prices. • We identify two sources of likely further cost pressures on electricity prices. • We estimate future retail electricity prices under five scenarios. • We discuss barriers and solutions to controlling peak demand growth.

  17. Wage and Benefit Changes in Response to Rising Health Insurance Costs

    OpenAIRE

    Dana Goldman; Neeraj Sood; Arleen Leibowitz

    2005-01-01

    Many companies have defined-contribution benefit plans requiring employees to pay the full cost (before taxes) of more generous health insurance choices. Research has shown that employee decisions are quite responsive to these arrangements. What is less clear is how the total compensation package changes when health insurance premiums rise. This paper examines employee compensation decisions during a three-year period when health insurance premiums were rising rapidly. The data come from a si...

  18. Cost evolution of electric energy in Brazil

    International Nuclear Information System (INIS)

    Oliveira, A. de; Contreras, E.C.A.

    1981-01-01

    An analysis of electric energy costs in Brazil is presented. Hydro, coal and nuclear costs are analysed and the final conclusion seems to indicate that nuclear power plants are not economically interesting untill the Brazilian electric capacity attains 110 GW average power. (Author) [pt

  19. Projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.

    2010-01-01

    This paper describes the outcomes of a study on the projected costs of generating electricity. It presents the latest data available on electricity generating costs for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. The study reaches 2 key conclusions. First, at a 5% real interest rate, nuclear energy is the most competitive solution for base-load electricity generation followed by coal-fired plants without carbon capture and natural gas-fired combined plants. It should be noted that coal with carbon capture has not reached a commercial phase. Second, at a 10% interest rate, nuclear remains the most competitive in Asia and North America but in Europe, coal without carbon capture equipment, followed by coal with carbon capture equipment, and gas-fired combined cycle turbines are overall more competitive than nuclear energy. The results highlight the paramount importance of interest rates (this dependence is a direct consequence of the nuclear energy's high capital costs) and of the carbon price. For instance if we assume a 10% interest rate and a cost of 50 dollar per tonne of CO 2 , nuclear energy would become competitive against both coal and gas. (A.C.)

  20. Cost estimate of electricity produced by TPV

    Science.gov (United States)

    Palfinger, Günther; Bitnar, Bernd; Durisch, Wilhelm; Mayor, Jean-Claude; Grützmacher, Detlev; Gobrecht, Jens

    2003-05-01

    A crucial parameter for the market penetration of TPV is its electricity production cost. In this work a detailed cost estimate is performed for a Si photocell based TPV system, which was developed for electrically self-powered operation of a domestic heating system. The results are compared to a rough estimate of cost of electricity for a projected GaSb based system. For the calculation of the price of electricity, a lifetime of 20 years, an interest rate of 4.25% per year and maintenance costs of 1% of the investment are presumed. To determine the production cost of TPV systems with a power of 12-20 kW, the costs of the TPV components and 100 EUR kW-1el,peak for assembly and miscellaneous were estimated. Alternatively, the system cost for the GaSb system was derived from the cost of the photocells and from the assumption that they account for 35% of the total system cost. The calculation was done for four different TPV scenarios which include a Si based prototype system with existing technology (etasys = 1.0%), leading to 3000 EUR kW-1el,peak, an optimized Si based system using conventional, available technology (etasys = 1.5%), leading to 900 EUR kW-1el,peak, a further improved system with future technology (etasys = 5%), leading to 340 EUR kW-1el,peak and a GaSb based system (etasys = 12.3% with recuperator), leading to 1900 EUR kW-1el,peak. Thus, prices of electricity from 6 to 25 EURcents kWh-1el (including gas of about 3.5 EURcents kWh-1) were calculated and compared with those of fuel cells (31 EURcents kWh-1) and gas engines (23 EURcents kWh-1).

  1. The High Rise Low Cost Housing : Sustainable Neighbourhood Elements (Green Elements) in Malaysia

    Science.gov (United States)

    Wahi, Noraziah; Mohamad, Ismail; Mohamad Zin, Rosli; Munikanan, Vikneswaran; Junaini, Syahrizan

    2018-03-01

    The sustainable development is a vital measure to alleviate the greenhouse gas effect, global warming and any other environment issues. The sustainable neighbourhood concept is not new in Malaysia, However, the concept still needs attention and awareness from the stakeholders. This paper discusses on the sustainable neighbourhood elements specifically green elements application on the high rise low cost housing in Malaysia. Malaysia should have focused sustainable neighbourhood planning and design especially on the high rise low cost housing therefore the future generation can be benefited from this type development.

  2. Consumerism and wellness: rising tide, falling cost.

    Science.gov (United States)

    Domaszewicz, Alexander

    2008-01-01

    Annual employer-sponsored health plan cost increases have been slowing incrementally due to slowing health care utilization--a phenomenon very likely tied to the proliferation of health management activities, wellness programs and other consumerism strategies. This article describes the sharp rise in recent years of consumer-directed health plans (CDHPs) and explains what developments must happen for genuine consumer-directed health care to realize its full potential. These developments include gathering transparent health care information, increasing consumer demand for that information and creating truly intuitive data solutions that allow consumers to easily access information in order to make better health care decisions.

  3. The ''reference costs'' of the electrical production

    International Nuclear Information System (INIS)

    1997-05-01

    This study objective is to give an aid for the investments choice in the field of electricity production and for national choices in the field of long-dated production. Important evolutions appeared since the last exercise ''reference costs'' of 1993. Electricity production costs, presented in this study, are actualized economic costs. They consider the following production facilities: nuclear, pulverized coal with fumes processing, circulating fluidized bed, combustion turbines, cogeneration and wind turbines. (A.L.B.)

  4. The cost of nuclear electricity: economic values and political calculations

    International Nuclear Information System (INIS)

    Stauffer, T.

    1985-01-01

    The subject is covered in sections: introduction (monetary inflation; US-style rate-base formula; cost escalation); electricity generation costs (rate-base calculation formula; regulatory versus economic costs; inflationary case; cost-of-service rates versus inflation; first year electricity costs); rate shock (A. comparison with oil; B. nuclear case; C. comparison with coal/nuclear system; vintaged electricity costs versus growth and inflation); conclusions. (U.K.)

  5. Least cost 100% renewable electricity scenarios in the Australian National Electricity Market

    International Nuclear Information System (INIS)

    Elliston, Ben; MacGill, Iain; Diesendorf, Mark

    2013-01-01

    Least cost options are presented for supplying the Australian National Electricity Market (NEM) with 100% renewable electricity using wind, photovoltaics, concentrating solar thermal (CST) with storage, hydroelectricity and biofuelled gas turbines. We use a genetic algorithm and an existing simulation tool to identify the lowest cost (investment and operating) scenarios of renewable technologies and locations for NEM regional hourly demand and observed weather in 2010 using projected technology costs for 2030. These scenarios maintain the NEM reliability standard, limit hydroelectricity generation to available rainfall, and limit bioenergy consumption. The lowest cost scenarios are dominated by wind power, with smaller contributions from photovoltaics and dispatchable generation: CST, hydro and gas turbines. The annual cost of a simplified transmission network to balance supply and demand across NEM regions is a small proportion of the annual cost of the generating system. Annual costs are compared with a scenario where fossil fuelled power stations in the NEM today are replaced with modern fossil substitutes at projected 2030 costs, and a carbon price is paid on all emissions. At moderate carbon prices, which appear required to address climate change, 100% renewable electricity would be cheaper on an annual basis than the replacement scenario

  6. Proposal for the creation of an inquiry commission to investigate the reality of electricity production costs in France

    International Nuclear Information System (INIS)

    2009-01-01

    After EDF's president has asked for a 20 percent rise for retail electricity prices in France, a group of members of the French Parliament has proposed the creation of an inquiry commission to investigate the costs of electricity production and transport in France (depending on production mode), evaluate the investments required to ensure a safe and reliable operation of nuclear plants, compare the investments needed depending on various electricity production modes for the next ten years in France, study various scenarios including the shutdown of all nuclear plants in the country, and therefore be able to evaluate the tariff evolutions that are required for the future

  7. A framework and review of customer outage costs: Integration and analysis of electric utility outage cost surveys

    Energy Technology Data Exchange (ETDEWEB)

    Lawton, Leora; Sullivan, Michael; Van Liere, Kent; Katz, Aaron; Eto, Joseph

    2003-11-01

    A clear understanding of the monetary value that customers place on reliability and the factors that give rise to higher and lower values is an essential tool in determining investment in the grid. The recent National Transmission Grid Study recognizes the need for this information as one of growing importance for both public and private decision makers. In response, the U.S. Department of Energy has undertaken this study, as a first step toward addressing the current absence of consistent data needed to support better estimates of the economic value of electricity reliability. Twenty-four studies, conducted by eight electric utilities between 1989 and 2002 representing residential and commercial/industrial (small, medium and large) customer groups, were chosen for analysis. The studies cover virtually all of the Southeast, most of the western United States, including California, rural Washington and Oregon, and the Midwest south and east of Chicago. All variables were standardized to a consistent metric and dollar amounts were adjusted to the 2002 CPI. The data were then incorporated into a meta-database in which each outage scenario (e.g., the lost of electric service for one hour on a weekday summer afternoon) is treated as an independent case or record both to permit comparisons between outage characteristics and to increase the statistical power of analysis results. Unadjusted average outage costs and Tobit models that estimate customer damage functions are presented. The customer damage functions express customer outage costs for a given outage scenario and customer class as a function of location, time of day, consumption, and business type. One can use the damage functions to calculate outage costs for specific customer types. For example, using the customer damage functions, the cost experienced by an ''average'' customer resulting from a 1 hour summer afternoon outage is estimated to be approximately $3 for a residential customer, $1

  8. Environmental degradation costs in electricity generation: The case of the Brazilian electrical matrix

    International Nuclear Information System (INIS)

    Alves, Laura Araujo; Uturbey, Wadaed

    2010-01-01

    The main purpose of this paper is to emphasize the importance of including environmental degradation costs in the long-term planning of the Brazilian electricity sector. To this aim, environmental external costs associated to both hydro-power and thermal-power electricity generation are investigated. Monetary valuation methodologies are applied and environmental degradation costs, expressed in per kWh of generated energy, are obtained for the main types of generation sources of the Brazilian electricity matrix. Both local pollution due to particulate matter emissions and global warming effects are assessed. A classification of the sources from the point of view of their impact on the environment is given. Degradation costs associated to the installed capacity expansion in the Brazilian electricity sector during the time horizon 2007-2016 are estimated. These resulting costs represent lower boundary damage estimates associated only with the energy to be generated during the period. Results indicate that local pollution caused by a small number of plants could be even more costly to society than global warming and, also, show the importance of considering not only unitary damage costs but the participation of each source on the generated energy during the time horizon, as a guide to planning and policy making.

  9. Electricity transmission congestion costs: A review of recent reports

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard C.; Eto, Joseph H.

    2003-10-01

    Recently, independent system operators (ISOs) and others have published reports on the costs of transmission congestion. The magnitude of congestion costs cited in these reports has contributed to the national discussion on the current state of U.S. electricity transmission system and whether it provides an adequate platform for competition in wholesale electricity markets. This report reviews reports of congestion costs and begins to assess their implications for the current national discussion on the importance of the U.S. electricity transmission system for enabling competitive wholesale electricity markets. As a guiding principle, we posit that a more robust electricity system could reduce congestion costs; and thereby, (1) facilitate more vibrant and fair competition in wholesale electricity markets, and (2) enable consumers to seek out the lowest prices for electricity. Yet, examining the details suggests that, sometimes, there will be trade-offs between these goals. Therefore, it is essential to understand who pays, how much, and how do they benefit in evaluating options (both transmission and non-transmission alternatives) to address transmission congestion. To describe the differences among published estimates of congestion costs, we develop and motivate three ways by which transmission congestion costs are calculated in restructured markets. The assessment demonstrates that published transmission congestion costs are not directly comparable because they have been developed to serve different purposes. More importantly, critical information needed to make them more comparable, for example in order to evaluate the impacts of options to relieve congestion, is sometimes not available.

  10. Reference costs of electricity

    International Nuclear Information System (INIS)

    Terraz, N.

    1997-01-01

    The calculation of electric power production reference costs is used in France, even in the present case of over-capacity, for comparing the relative interest of the various means of power generation (nuclear plants, coal plants, hydroelectricity, gas combined cycles, etc.) and as an aid for future investment decisions. Reference costs show a sharp decrease between 1993 and 1997 due to advancements in nuclear plant operating ability and fossil fuel price decrease. Actuarial rates, plant service life, fuel costs and exchange rates are important parameters. The various costs from the research stage to the waste processing stages are discussed and the reference costs of the various power generation systems are presented and compared together with their competitiveness; the future of wind energy and cogeneration and the prospective of the renewal of nuclear plants at the 2010 horizon are also addressed

  11. Economic cost of electricity sold to new aluminium smelters

    International Nuclear Information System (INIS)

    Belanger, G.; Bernard, J.T.

    2008-01-01

    Low cost electricity was a key factor for establishing an aluminium industry in Quebec. Smelters in the province use 50 terawatt hours of electricity per year, which represents 25 per cent of the total consumed in Quebec. This article assessed the profitability of new industrial projects that require large quantities of electricity at a time when the cost of new power plants is increasing. However, electricity is being sold below cost and the difference is subsidized by the government. The investment is justified by the government because these new projects create high paying jobs. The authors presented cases of 2 new aluminium plants, and concluded that they represented a very high economic cost for the province. 1 tab

  12. Comparative Study on Electric Generation Cost of HTR with Another Electric Plant Using LEGECOST Program

    International Nuclear Information System (INIS)

    Mochamad-Nasrullah; Soetrisnanto, Arnold Y.; Tosi-Prastiadi; Adiwardojo

    2000-01-01

    Monetary and economic crisis in Indonesia resulted in impact of electricity and demand and supply planning that it has to be reevaluated. One of the reasons is budget limitation of the government as well as private companies. Considering this reason, the economic calculation for all of aspect could be performed, especially the calculation of electric generation cost. This paper will discuss the economic aspect of several power plants using fossil and nuclear fuel including High Temperature Reactor (HTR). Using Levelized Generation Cost (LEGECOST) program developed by IAEA (International Atomic Energy Agency), the electric generation cost of each power plant could be calculated. And then, the sensitivity analysis has to be done using several economic parameters and scenarios, in order to be known the factors that influence the electric generation cost. It could be concluded, that the electric generation cost of HTR is cheapest comparing the other power plants including nuclear conventional. (author)

  13. Electric plant cost and power production expenses 1991

    International Nuclear Information System (INIS)

    1993-01-01

    Electric Plant Cost and Power Production Expenses is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels (CNEAF); Energy Information Administration (EIA); US Department of Energy. This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, Federal, State, and local governments, and the general public. These data are collected and published to fulfill data collection and dissemination responsibilities of the Energy Information Administration (EIA), as specified in the Federal Energy Administration Act (Public Law 93-275), as amended

  14. Electric plant cost and power production expenses 1990

    International Nuclear Information System (INIS)

    1992-06-01

    Electric Plant Cost and Power Production Expenses is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA); US Department of Energy. This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, Federal, State, and local governments, and the general public. These data are collected and published to fulfill data collection and dissemination responsibilities of the Energy Information Administration (EIA), as specified in the Federal Energy Administration Act (Public Law 93-275), as amended

  15. Total cost estimates for large-scale wind scenarios in UK

    International Nuclear Information System (INIS)

    Dale, Lewis; Milborrow, David; Slark, Richard; Strbac, Goran

    2004-01-01

    The recent UK Energy White Paper suggested that the Government should aim to secure 20% of electricity from renewable sources by 2020. A number of estimates of the extra cost of such a commitment have been made, but these have not necessarily included all the relevant cost components. This analysis sets out to identify these and to calculate the extra cost to the electricity consumer, assuming all the renewable electricity is sourced from wind energy. This enables one of the more controversial issues--the implications of wind intermittency--to be addressed. The basis of the assumptions associated with generating costs, extra balancing costs and distribution and transmission system reinforcement costs are all clearly identified and the total costs of a '20% wind' scenario are compared with a scenario where a similar amount of energy is generated by gas-fired plant. This enables the extra costs of the renewables scenario to be determined. The central estimate of the extra costs to electricity consumers is just over 0.3 p/kW h in current prices (around 5% extra on average domestic unit prices). Sensitivity analyses examine the implications of differing assumptions. The extra cost would rise if the capital costs of wind generation fall slower than anticipated, but would fall if gas prices rise more rapidly than has been assumed, or if wind plant are more productive. Even if it is assumed that wind has no capacity displacement value, the added cost to the electricity consumer rises by less than 0.1 p/kW h. It is concluded that there does not appear to be any technical reason why a substantial proportion of the country's electricity requirements could not be delivered by wind

  16. Formation of costs of high-rise objects of housing and civil purpose based on enlarged norms

    Science.gov (United States)

    Vorotyntseva, Anna; Ovsiannikov, Andrei; Bolgov, Vladimir

    2018-03-01

    When determining the cost of capital construction objects, for purposes of pre-design workings out and purposes of initial maximum initial price determination on tenders, construction price norms are used (CPNs). Modern CPNs are not designed to determine the value of high-rise buildings. It is necessary to adapt modern CPNs to get opportunity for the possibility to take into account special cost factors in determining the cost of high-rise buildings. The main ways can be: selection of new representative objects or application of additional correction factors.

  17. Electricity generation cost

    International Nuclear Information System (INIS)

    Bald, M.

    1984-01-01

    Also questions of efficiency play a part in the energy discussion. In this context, the economic evaluation of different energy supply variants is of importance. Especially with regard to the generation of electric power there have been discussions again and again during the last years on the advantage of the one or the other kind of electric power generation. In the meantime, a large number of scientific studies has been published on this topic which mainly deal with comparisons of the costs of electric power generated by hard coal or nuclear energy, i.e. of those energy forms which still have the possibilities of expansion. The following part shows a way for the evaluation of efficiency comparisons which starts from simplified assumptions and which works with arithmetical aids, which don't leave the area of the fundamental operations. The general comprehensibility is paid for with cuts on ultimate analytical and arithmetical precision. It will, however, turn out that the results achieved by this method don't differ very much from those which have been won by scientific targets. (orig./UA) [de

  18. Construction Costs Assessment of Structural Systems for Low-Rise and Social Welfare Housing

    Directory of Open Access Journals (Sweden)

    Carrillo Julián

    2015-09-01

    Full Text Available A comparative analysis of the costs related to the construction of low-rise, low-cost and social welfare housing was carried out. The study included three of the most commonly used structural systems for low-rise housing in Latin America, such as the traditional system of confined masonry walls, concrete walls conventionally reinforced with welded-wire meshes and concrete walls reinforced with steel fiber. The cost comparison was carried out by budgets analysis, which were performed based on construction quantities, unit prices and particular items for each structural system. It was found in the study that, from an economic point of view, the systems of concrete walls reinforced with welded-wire meshes or steel fibers are more advantageous than confined masonry systems. In addition, the integral comparison of the three structural systems demonstrates that the industrialized system of steel fiber reinforced concrete walls allows obtaining greater advantages of cleaning and sustainability, faster construction, lower cost and a more attractive scenario for builders investing in such projects.

  19. The Social Costs of Electricity Generation—Categorising Different Types of Costs and Evaluating Their Respective Relevance

    Directory of Open Access Journals (Sweden)

    Sascha Samadi

    2017-03-01

    Full Text Available Various electricity generation technologies using different primary energy sources are available. Many published studies compare the costs of these technologies. However, most of those studies only consider plant-level costs and do not fully take into account additional costs that societies may face in using these technologies. This article reviews the literature on the costs of electricity generation technologies, aiming to determine which types of costs are relevant from a societal point of view when comparing generation technologies. The paper categorises the relevant types of costs, differentiating between plant-level, system and external costs as the main categories. It discusses the relevance of each type of cost for each generation technology. The findings suggest that several low-carbon electricity generation technologies exhibit lower social costs per kWh than the currently dominant technologies using fossil fuels. More generally, the findings emphasise the importance of taking not only plant-level costs, but also system and external costs, into account when comparing electricity generation technologies from a societal point of view. The article intends to inform both policymakers and energy system modellers, the latter who may strive to include all relevant types of costs in their models.

  20. External costs of nuclear-generated electricity

    International Nuclear Information System (INIS)

    Rotaru, I.; Glodeanu, F.; Popescu, D.; Andrei, V.

    2004-01-01

    External costs of nuclear power include: future financial liabilities arising from decommissioning and dismantling of nuclear facilities, health and environmental impacts of radioactivity releases in routine operation, radioactive waste disposal and effects of severe accidents. The nuclear energy industry operates under regulations that impose stringent limits to atmospheric emissions and liquid effluents from nuclear facilities as well as requiring the containment and confinement of solid radioactive waste to ensure its isolation from the biosphere as long as it may be harmful for human health and the environment. The capital and operating costs of nuclear power plants and fuel cycle facilities already internalize a major portion of the above-mentioned potential external costs, and these are reflected in the prices paid by consumers of nuclear-generated electricity. The externality related to potential health and environmental impacts of radioactive releases during routine operations have been assessed in a large number of comprehensive studies, in particular the ExternE project that was created in the framework of the European Commission. With regard to effects of severe nuclear accidents, a special legal regime, the third-party liability system, has been implemented to provide limited third party liability coverage in the event of a nuclear accident. The nuclear plant owners are held liable for some specified first substantial part of damages to third parties, and must secure insurance coverage adequate to cover this part. The Government provides coverage for some specified substantial second part of the damages, with any remaining damages to be considered by the national legislation. Thus, the costs of an incident or accident are fully internalized in the costs borne by the nuclear plant owners. Externalities of energy are not limited to environmental and health related impacts, but may result also from macro-economic, policy or strategic factors not reflected

  1. On the electricity shortage, price and electricity theft nexus

    International Nuclear Information System (INIS)

    Jamil, Faisal

    2013-01-01

    Pakistan is facing severe electricity shortfall of its history since 2006. Several measures have been implemented in order to mitigate electricity shortage. The focus has been on raising the installed capacity of electricity generation and transmission. The present policy results in expensive thermal electricity generation mostly using expensive and environmentally hazardous furnace oil and inability of utilities to recover their cost of supply although there is unprecedented rise in electricity tariffs. This study concentrates on the electricity demand and traces the relationship between electricity shortfalls, tariff rate and electricity theft in the background of recent electricity crisis using the data for the period 1985–2010. We employed the Granger causality test through error correction model and out-of-sample causality through variance decomposition method. Empirical evidence shows that electricity theft greatly influences electricity shortfalls through lowering investment and inefficient use of electricity. The study concludes that electricity crisis cannot be handled without combating rampant electricity theft in the country. - Highlights: ► The study investigates relationship among electricity outages, price and electricity theft. ► It employed Johansen approach, ECM and variance decomposition analysis. ► Empirical evidence shows that electricity theft causes outages and rising tariff rates. ► Variance decomposition analysis results are slightly different from ECM

  2. A perspective on electric vehicles: cost-benefit analysis and potential demand

    International Nuclear Information System (INIS)

    2011-01-01

    This report proposes some quantitative elements to assess the large scale diffusion of electric vehicles and analyse the potential demand for such vehicles. The first part proposes a cost-benefit analysis of the development of electric vehicles based on estimated costs and expected benefits by 2020. It addresses the following issues: framework and hypothesis, total cost of ownership, costs related to the deployment of a network of recharging infrastructures, assessment of external costs, and comparative cost-benefit analysis of electric vehicles. In the second part, the authors aim at identifying a potential demand for electric vehicles from the 2008 French national transport displacement survey (ENTD 2008) which provides recent data on the mobility of the French population

  3. Historical costs of coal-fired electricity and implications for the future

    International Nuclear Information System (INIS)

    McNerney, James; Doyne Farmer, J.; Trancik, Jessika E.

    2011-01-01

    We study the cost of coal-fired electricity in the United States between 1882 and 2006 by decomposing it in terms of the price of coal, transportation cost, energy density, thermal efficiency, plant construction cost, interest rate, capacity factor, and operations and maintenance cost. The dominant determinants of cost have been the price of coal and plant construction cost. The price of coal appears to fluctuate more or less randomly while the construction cost follows long-term trends, decreasing from 1902 to 1970, increasing from 1970 to 1990, and leveling off since then. Our analysis emphasizes the importance of using long time series and comparing electricity generation technologies using decomposed total costs, rather than costs of single components like capital. By taking this approach we find that the history of coal-fired electricity suggests there is a fluctuating floor to its future costs, which is determined by coal prices. Even if construction costs resumed a decreasing trend, the cost of coal-based electricity would drop for a while but eventually be determined by the price of coal, which fluctuates while showing no long-term trend. - Research highlights: → 125-year history highlights the dominant determinants of coal-fired electricity costs. → Results suggest a fluctuating floor to future costs, determined by coal prices. → Analysis emphasizes importance of comparing technologies using decomposed total costs.

  4. Low-cost distributed solar-thermal-electric power generation

    Science.gov (United States)

    Der Minassians, Artin; Aschenbach, Konrad H.; Sanders, Seth R.

    2004-01-01

    Due to their high relative cost, solar electric energy systems have yet to be exploited on a widespread basis. It is believed in the energy community that a technology similar to photovoltaic (PV), but offered at about $1/W would lead to widespread deployment at residential and commercial sites. This paper addresses the investigation and feasibility study of a low-cost solar thermal electricity generation technology, suitable for distributed deployment. Specifically, we discuss a system based on nonimaging solar concentrators, integrated with free-piston Stirling engine devices incorporating integrated electric generation. We target concentrator-collector operation at moderate temperatures, in the range of 125°C to 150°C. This temperature is consistent with use of optical concentrators with concentration ratios on the order of 1-2. These low ratio concentrators admit wide angles of radiation acceptance and are thus compatible with no diurnal tracking, and no or only a few seasonal adjustments. Thus, costs and reliability hazards associated with tracking hardware systems are avoided. Further, we note that in the intended application, there is no shortage of incident solar energy, but rather it is the capital cost of the solar-electric system that is most precious. Thus, we outline a strategy for exploiting solar resources in a cost constrained manner. The paper outlines design issues, and a specific design for an appropriately dimensioned free-piston Stirling engine. Only standard low-cost materials and manufacturing methods are required to realize such a machine.

  5. Transmission pricing and stranded costs in the electric power industry

    International Nuclear Information System (INIS)

    Baumol, W.J.; Sidak, J.G.

    1995-09-01

    Stranded costs are those costs that electric utilities are currently permitted to recover through their rates but whose recovery may be impeded or prevented by the advent of competition in the industry. Estimates of these costs run from the tens to the hundreds of billions of dollars. Should regulators permit utilities to recover stranded costs while they take steps to promote competition in the electric power industry. William Baumol and J. Gregory Sidak argue that answer to that question should be yes.The authors show that a transmission price, the price for sending electricity over the transmission grid, can be determined in a manner that is compatible with economic efficiency and clearly neutral in its effects upon all competitors in electricity generation. A correctly constructed regime of transmission pricing may in fact achieve the efficiency and equity goals that justify the recovery of stranded costs

  6. Trends in Japan's power generation costs after the Fukushima Daiichi Nuclear Power Plant accident and their influence on finance of electric utilities

    International Nuclear Information System (INIS)

    Matsuo, Yuhji; Yamaguchi, Yuhji; Murakami, Tomoko

    2013-01-01

    Following the Fukushima Daiichi nuclear power plant accident, the nuclear reactors that were suspended for periodic inspections after the Fukushima accident were not permitted to resume operation, and nuclear power generation in Japan continued to decline. In this article, the authors quantitatively evaluated the effects on power generation costs of Japan's situation, using electric utilities financial reports up to FY 2011. We also analyzed the profitability of the Japanese electric industry, using the financial statements included in the reports, and quantitatively evaluated the effects of changes in power generation costs. The total cost of power generation has increased from 7.5 trillion yen in FY 2010 before the Fukushima accident to 9.6 trillion yen in FY 2011 and to 10.6 trillion yen in FY 2012. In particular, the fuel cost for thermal power generation rose sharply from 3.7 trillion yen in FY 2010 to 6.1 trillion yen in FY 2011 and 7.3 trillion yen in FY 2012, almost doubling in the two years from FY 2010 to 2012. The unit cost of power generation rose sharply from 8.6 yen/kWh in FY 2010 to 11.8 yen/kWh in FY 2011 and 13.5 yen/kWh in FY 2012. The unit cost is expected to rise even further in FY 2013 due to the weak yen. As the result not only Tokyo Electric Power Company, but also the other general electric utilities registered huge net losses. Their retained earnings (total of eight utilities) dropped by 2 trillion yen between FY 2010 and 2012. With increased thermal power generation, the risk of rising costs associated with changes in primary energy prices and exchange rates has increased drastically. For the stability of the electricity industry and the development of the Japanese economy, the government should clearly formulate a basic policy regarding the composition of power sources, and an effective plan both at home and abroad, and should develop a system that will be also to handle sudden changes in the composition of power sources. (author)

  7. Projected costs of generating electricity - 2010 edition

    International Nuclear Information System (INIS)

    2010-01-01

    This joint report by the International Energy Agency (IEA) and the OECD Nuclear Energy Agency (NEA) is the seventh in a series of studies on electricity generating costs. It presents the latest data available for a wide variety of fuels and technologies, including coal and gas (with and without carbon capture), nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal as well as combined heat and power (CHP). It provides levelised costs of electricity (LCOE) per MWh for almost 200 plants, based on data covering 21 countries (including four major non-OECD countries), and several industrial companies and organisations. For the first time, the report contains an extensive sensitivity analysis of the impact of variations in key parameters such as discount rates, fuel prices and carbon costs on LCOE. Additional issues affecting power generation choices are also examined. The study shows that the cost competitiveness of electricity generating technologies depends on a number of factors which may vary nationally and regionally. Readers will find full details and analyses, supported by over 130 figures and tables, in this report which is expected to constitute a valuable tool for decision makers and researchers concerned with energy policies and climate change

  8. Energy use, cost and CO2 emissions of electric cars

    International Nuclear Information System (INIS)

    van Vliet, Oscar; Brouwer, Anne Sjoerd; Kuramochi, Takeshi; van den Broek, Machteld; Faaij, Andre

    2011-01-01

    We examine efficiency, costs and greenhouse gas emissions of current and future electric cars (EV), including the impact from charging EV on electricity demand and infrastructure for generation and distribution. Uncoordinated charging would increase national peak load by 7% at 30% penetration rate of EV and household peak load by 54%, which may exceed the capacity of existing electricity distribution infrastructure. At 30% penetration of EV, off-peak charging would result in a 20% higher, more stable base load and no additional peak load at the national level and up to 7% higher peak load at the household level. Therefore, if off-peak charging is successfully introduced, electric driving need not require additional generation capacity, even in case of 100% switch to electric vehicles. GHG emissions from electric driving depend most on the fuel type (coal or natural gas) used in the generation of electricity for charging, and range between 0 g km -1 (using renewables) and 155 g km -1 (using electricity from an old coal-based plant). Based on the generation capacity projected for the Netherlands in 2015, electricity for EV charging would largely be generated using natural gas, emitting 35-77 g CO 2 eq km -1 . We find that total cost of ownership (TCO) of current EV are uncompetitive with regular cars and series hybrid cars by more than 800 EUR year -1 . TCO of future wheel motor PHEV may become competitive when batteries cost 400 EUR kWh -1 , even without tax incentives, as long as one battery pack can last for the lifespan of the vehicle. However, TCO of future battery powered cars is at least 25% higher than of series hybrid or regular cars. This cost gap remains unless cost of batteries drops to 150 EUR kWh -1 in the future. Variations in driving cost from charging patterns have negligible influence on TCO. GHG abatement costs using plug-in hybrid cars are currently 400-1400 EUR tonne -1 CO 2eq and may come down to -100 to 300 EUR tonne -1 . Abatement cost using

  9. 20 CFR 404.272 - Indexes we use to measure the rise in the cost-of-living.

    Science.gov (United States)

    2010-04-01

    ... cost-of-living. 404.272 Section 404.272 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE, SURVIVORS AND DISABILITY INSURANCE (1950- ) Computing Primary Insurance Amounts Cost-Of-Living Increases § 404.272 Indexes we use to measure the rise in the cost-of-living. (a) The bases. To measure...

  10. Impact of the fuel cost in the electric generation cost by nuclear means

    International Nuclear Information System (INIS)

    Ramirez S, J.R.; Alonso V, G.; Gomez R, M.C.; Palacios H, J.

    2007-01-01

    In recent years, the uranium cost has been increased in the international market due to a countless of factors like they are: increase of the demand, the turnaround of the nuclear energy in some Asian countries, the decrease of the offer due to problems in the mining for their extraction, etc. These increments impact the costs of electric generation in the concept of fuel, presently work is calculated that order is the prospective impact when the costs of the uranium and the services of the fuel cycle are increased to the speed that one has come increasing, and an increase is postulated beyond the 100 usd/lb U 3 O 8 , being also calculated its impact in the total cost of electric generation by nuclear means. (Author)

  11. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  12. Reference costs of the electric power production

    International Nuclear Information System (INIS)

    2003-06-01

    This study periodically realized by the DGEMP aims to compare the competitiveness of the different channels of electric power production, for different utilization conditions. The first part ''reference costs of the 2003 electric power production'' examines the prices of the electric power produced by different channels in particular in the framework of the industrial implementing in 2015. The nuclear and thermal power plants are concerned. The second part is devoted to the decentralized production channels (wind energy, photovoltaic, cogeneration heat-electricity) is under construction and will be presented next year. (A.L.B.)

  13. Costs of electricity deregulation

    International Nuclear Information System (INIS)

    Woo, C.K.; King, M.

    2006-01-01

    The last decade has witnessed efforts throughout the world to deregulate the electricity industry, with varied results. While there have been a few qualified success stories, many challenges of deregulation have come to light. These challenges can lead to negative, even disastrous, outcomes. Based on a comprehensive literature review, this paper catalogues problems experienced in various deregulation efforts, and considers the application of the lessons learned from this history to Israel, which is considering deregulation. Failings of deregulation are found to center around the following problems: high set-up cost; complicated market design; inevitable spot price volatility; market power abuse; inefficient investment; difficulty in reducing generation cost; dysfunctional input markets; stranded cost; unequal distribution of benefits. We find that many of these problems are exacerbated by the particular circumstances faced by Israel, and advise any country or region considering deregulation to carefully consider these obstacles to success. (author)

  14. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  15. Costs comparison of electric energy in Brazil

    International Nuclear Information System (INIS)

    Goncalves, D.; Menegassi, J.

    1981-01-01

    A cost comparison study of various sources of electric energy generation was performed using uniform analysis criteria. The results indicate higher costs for coal, followed by nuclear and hidro. It was verified that presently, large hidro-power plants can only be located far from the load centers, with increasing costs of hidro-power energy in Brazil. These costs become higher than the nuclear plant if the hidro plant is located at distances exceeding 1000 Km. (Author) [pt

  16. Projected Costs of Generating Electricity

    International Nuclear Information System (INIS)

    Plante, J.

    1998-01-01

    Every 3 to 4 years, the NEA undertakes a study on projected costs of generating electricity in OECD countries. This started in 1983 and the last study (1997) has just be completed. All together 5 studies were performed, the first three dealing with nuclear and coal options, while the 1992 and 1997 included also the gas option. The goal of the study is to compare, country by country, generating costs of nuclear, coal-fired and gas-fired power plants that could be commissioned in the respondent countries by 2005-2010

  17. Power Play: Calculating Home Electricity Consumption

    Science.gov (United States)

    Roman, Harry T.

    2007-01-01

    With both energy usage and energy costs rising rapidly, people can benefit from paying closer attention to their consumption of energy. Students can gain greater awareness of their personal use of electricity and get some excellent experience with the practical application of mathematics by studying their families' consumption of electricity. A…

  18. Nuclear and conventional baseload electricity generation cost experience

    International Nuclear Information System (INIS)

    1993-04-01

    The experienced costs of electricity generation by nuclear and conventional plants and the expected costs of future plants are important for evaluating the economic attractiveness of various power projects and for planning the expansion of electrical generating systems. The main objective of this report is to shed some light on recent cost experience, based on well authenticated information made available by the IAEA Member States participating in this study. Cost information was provided by Canada (Ontario Hydro), Czechoslovakia, Hungary, India, the Republic of Korea and Spain. Reference is also made to information received from Brazil, China, France, Russia and the United States of America. The part of the report that deals with cost experience is Section 2, where the costs of both nuclear and fossil fired plants are reviewed. Other sections give emphasis to the analysis of the major issues and relevant cost elements influencing the costs of nuclear power plants and to a discussion of cost projections. Many of the conclusions can also be applied to conventional plants, although they are usually less important than in the case of nuclear plants. 1 ref., figs and tabs

  19. Electricity generation costs by source, and costs and benefits by substitutions of generation source

    International Nuclear Information System (INIS)

    Akimoto, Keigo; Oda, Junichiro; Sano, Fuminori

    2015-01-01

    After Fukushima-daiichi nuclear power accident, the Japanese government assessed the electricity generation costs by source in 2011. However, the conditions have been changing, and this study newly assessed the generation costs by source using new data. The generation costs for coal, oil, gas, nuclear, PV and wind power for 2013 and 2030 were estimated. According to the analysis, coal power is the cheapest when climate change damage costs are not considered, and nuclear power is the cheapest when the climate damage costs are considered. However, under the competitive electricity market in which power companies tend to invest in power plants with short-term payback investment preference, power companies will recognize higher costs of nuclear power particularly under highly uncertain nuclear regulation policies and energy policies. The policies to reduce the uncertainties are very important. (author)

  20. Life-cycle private-cost-based competitiveness analysis of electric vehicles in China considering the intangible cost of traffic policies

    International Nuclear Information System (INIS)

    Diao, Qinghua; Sun, Wei; Yuan, Xinmei; Li, Lili; Zheng, Zhi

    2016-01-01

    Highlights: • LCCs of BEVs and CVs are compared, considering the effects of traffic policy. • BEVs are economically competitive with both national and local subsidies. • Traffic policies have a significant impact on the competitiveness of BEVs. • The promotion of electric vehicles should prioritize mega-cities. - Abstract: Electric vehicles produce zero tailpipe emissions during operation and have thus been considered a most promising method for providing mobility while reducing the greenhouse gas emissions of the transportation sector in the future. The life-cycle cost of electric vehicles has been widely studied to evaluate their competitiveness compared to conventional vehicles. However, the competitiveness of electric vehicles is highly dependent on government promotion policies, and the effects of non-economic incentive policies are currently difficult to include in life-cycle cost analysis. These non-economic effects are usually measured by the intangible cost. Traffic policies represent typical non-economic incentive policies. In China, electric vehicles are exempted from purchase restrictions (license plate control policy) and driving restrictions; thus, the intangible cost of traffic policies has significant effects on the comparison of electric vehicles and conventional vehicles. In this paper, from the consumers’ perspective, the intangible cost of purchase and driving restrictions is modeled and expressed in monetary terms; then, the impact of these non-economic incentive policies are compared with subsidies and other costs of vehicles. Thus, a more comprehensive comparison between electric and conventional vehicles can be provided. Using three selected typical battery electric vehicles and three correspondingly similarly sized conventional vehicles in China, the private life-cycle costs of battery electric vehicles and conventional vehicles are calculated and compared, a parametric variation analysis is performed, and the effects of economic

  1. South Africa’s rising logistics costs: An uncertain future

    Directory of Open Access Journals (Sweden)

    Jan H. Havenga

    2014-12-01

    Full Text Available A country’s competitiveness can be severely hampered by an uncompetitive freight logistics system. During the first decade of the 21st century, two in-depth models were developed for South Africa which provide a framework for measuring and improving the country’s freight logistics system – the cost of logistics survey and the freight demand model. These models also allow for the development of scenarios for key identified risks. The objectives of this study were to provide an overview of South Africa’s surface freight transport industry,identify key risks to national competitiveness and suggest ways in which these risks could be mitigated. Freight flows were modelled by disaggregating the national input–output model into 372 origin–destination pairs and 71 commodity groups, followed by distance decay gravity-modelling. Logistics costs were calculated by relating commodity-level freight flows to the costs of fulfilling associated logistical functions. South Africa’s economy is highly transport intensive. Excessive dependence on road freight transport exacerbates this situation. Furthermore, the road freight transport’s key cost driver is fuel, driven in turn by the oil price. Scenario analysis indicated the risk posed by this rising and volatile input and should provide impetus for policy instruments to reduce transport intensity. As such, this study concluded that a reduction in freight transport intensity is required to reduce exposure to volatile international oil prices.

  2. Historical plant cost and annual production expenses for selected electric plants, 1982

    International Nuclear Information System (INIS)

    1984-01-01

    This publication is a composite of the two prior publications, Hydroelectric Plant Construction Cost and Annual Production Expenses and Thermal-Electric Plant Construction Cost and Annual Production Expenses. Beginning in 1979, Thermal-Electric Plant Construction Cost and Annual Production Expenses contained information on both steam-electric and gas-turbine electric plant construction cost and annual production expenses. The summarized historical plant cost described under Historical Plant Cost in this report is the net cumulative-to-date actual outlays or expenditures for land, structures, and equipment to the utility. Historical plant cost is the initial investment in plant (cumulative to the date of initial commercial operation) plus the costs of all additions to the plant, less the value of retirements. Thus, historical plant cost includes expenditures made over several years, as modifications are made to the plant. Power Production Expenses is the reporting year's plant operation and maintenance expenses, including fuel expenses. These expenses do not include annual fixed charges on plant cost (capital costs) such as interest on debt, depreciation or amortization expenses, and taxes. Consequently, total production expenses and the derived unit costs are not the total cost of producing electric power at the various plants. This publication contains data on installed generating capacity, net generation, net capability, historical plant cost, production expenses, fuel consumption, physical and operating plant characteristics, and other relevant statistical information for selected plants

  3. Cost and quality of fuels for electric utility plants 1991

    International Nuclear Information System (INIS)

    1992-01-01

    Data for 1991 and 1990 receipts and costs for fossil fuels discussed in the Executive Summary are displayed in Tables ES1 through ES7. These data are for electric generating plants with a total steam-electric and combined-cycle nameplate capacity of 50 or more megawatts. Data presented in the Executive Summary on generation, consumption, and stocks of fossil fuels at electric utilities are based on data collected on the Energy Information Administration, Form EIA-759, ''Monthly Power Plant Report.'' These data cover all electric generating plants. The average delivered cost of coal, petroleum, and gas each decreased in 1991 from 1990 levels. Overall, the average annual cost of fossil fuels delivered to electric utilities in 1991 was $1.60 per million Btu, a decrease of $0.09 per million Btu from 1990. This was the lowest average annual cost since 1978 and was the result of the abundant supply of coal, petroleum, and gas available to electric utilities. US net generation of electricity by all electric utilities in 1991 increased by less than I percent--the smallest increase since the decline that occurred in 1982.3 Coal and gas-fired steam net generation, each, decreased by less than I percent and petroleum-fired steam net generation by nearly 5 percent. Nuclear-powered net generation, however, increased by 6 percent. Fossil fuels accounted for 68 percent of all generation; nuclear, 22 percent; and hydroelectric, 10 percent. Sales of electricity to ultimate consumers in 1991 were 2 percent higher than during 1990

  4. Factors affecting the cost and competitiveness of nuclear electricity

    International Nuclear Information System (INIS)

    Bertel, E.; Stevens, G.H.

    1996-01-01

    The general context in which are carried out the investment choices of the electric sector has evolved in a significant way during these last years and the changes are to a certain extent irreversible. Economic globalization, deregulation of the electricity market, privatisation of electricity producers, and increasing awareness of environmental issues are modifying the policy-making landscape and the criteria and priorities of decision-makers in the power sector. Competitiveness remains a cornerstone for evaluating and choosing alternative technologies in the process of planning and decision-making for electricity system expansion or power plant replacement. Nevertheless, the production costs analysis inserts factors which were not taking before into account as for instance social impacts, health and environmental effects. These new approaches better reveal the total costs of the different production means. They will certainly lead to different choices than those based on the whole comparison of direct costs supported by producers. The economic studies carried out by the Nuclear Energy Agency of the OECD (NEA) cover all the preceding aspects and give objective information on the competitiveness of nuclear electricity. The nuclear industry has today the necessary means to take up the challenges of the electricity new markets. (O.M.)

  5. Strategies to address transition costs in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, L.; Hadley, S.; Hirst, E.

    1996-07-01

    Transition costs are the potential monetary losses that electric- utility shareholders, ratepayers, or other parties might experience because of structural changes in the electricity industry. Regulators, policy analysts, utilities, and consumer groups have proposed a number of strategies to address transition costs, such as immediately opening retail electricity markets or delaying retail competition. This report has 3 objectives: identify a wide range of strategies available to regulators and utilities; systematically examine effects of strategies; and identify potentially promising strategies that may provide benefits to more than one set of stakeholders. The many individual strategies are grouped into 6 major categories: market actions, depreciation options, rate-making actions, utility cost reductions, tax measures, and other options. Of the 34 individual strategies, retail ratepayers have primary or secondary responsibility for paying transition costs in 19 of the strategies, shareholders in 12, wheeling customers in 11, taxpayers in 8, and nonutility suppliers in 4. Most of the strategies shift costs among different segments of the economy, although utility cost reductions can be used to offset transition costs. Most of the strategies require cooperation of other parties, including regulators, to be implemented successfully; financial stakeholders must be engages in negotiations that hold the promise of shared benefits. Only by rejecting ``winner-take-all`` strategies will the transition-cost issue be expeditiously resolved.

  6. The cost of nuclear electricity: France after Fukushima

    International Nuclear Information System (INIS)

    Boccard, Nicolas

    2014-01-01

    The Fukushima disaster has lead the French government to release novel cost information relative to its nuclear electricity program allowing us to compute a levelized cost. We identify a modest escalation of capital cost and a larger than expected operational cost. Under the best scenario, the cost of French nuclear power over the last four decades is 59€/MWh (at 2010 prices) while in the worst case it is 83€/MWh. On the basis of these findings, we estimate the future cost of nuclear power in France to be at least 76€/MWh and possibly 117€/MWh. A comparison with the US confirms that French nuclear electricity nevertheless remains cheaper. Comparisons with coal, natural gas and wind power are carried out to find the advantage of these. - Highlights: • We compute the levelized cost of French nuclear power over 40 years using a novel court of audit report. • We include R and D, technology development, fissile fuel, financing cost, decommissioning and the back-end cycle. • We find a mild capital cost escalation and a high operation cost driven by a low fleet availability. • The levelized cost ranges between 59 and 83€/MWh (at 2010 prices) and compares favorably to the US. • A tentative cost for future nuclear power ranges between 76 and 117€/MWh and compares unfavorably against alternative fuels

  7. The Social Cost Of Electricity. Scenarios and Policy Implications

    International Nuclear Information System (INIS)

    Markandya, A.; Bigano, A.; Porchia, R.

    2010-01-01

    This book reports and rationalizes the state-of-the-art concerning the social costs of electricity generation. Social costs are assessed by adding to the private generation costs, the external costs associated with damages to human health, the environment, crops, materials, and those related to the consequences of climate change. The authors consider the evolution of these costs up to 2030 for major electricity generating technologies and, using these estimates, evaluate policy options for external cost internalization, providing quantitative scenarios by country and primary fuel for 2010, 2020 and 2030. While mainly focusing on European countries, the book also examines the situation in key emerging economies such as China, India, Brazil and Turkey. With an analysis of the policies for external costs internalization, this book will appeal to energy policymakers, research institutions focusing on energy, environmental and energy NGOs and trade associations, as well as energy companies.

  8. Impacts of intermittent renewable generation on electricity system costs

    International Nuclear Information System (INIS)

    Batalla-Bejerano, Joan; Trujillo-Baute, Elisa

    2016-01-01

    A successful deployment of power generation coming from variable renewable sources, such as wind and solar photovoltaic, strongly depends on the economic cost of system integration. This paper, in seeking to look beyond the impact of renewable generation on the evolution of the total economic costs associated with the operation of the electricity system, aims to estimate the sensitivity of balancing market requirements and costs to the variable and non-fully predictable nature of intermittent renewable generation. The estimations reported in this paper for the Spanish electricity system stress the importance of both attributes as well as power system flexibility when accounting for the cost of balancing services. - Highlights: •A successful deployment of VRES-E strongly depends on the economic cost of its integration. •We estimate the sensitivity of balancing market requirements and costs to VRES-E. •Integration costs depend on variability, predictability and system flexibility.

  9. Study Of The Fuel Cycle Effect To The Electricity Generating Cost

    International Nuclear Information System (INIS)

    Salimy, D. H.

    1998-01-01

    The nuclear fuel cycle cost contributes relatively small fraction to the total nuclear power generation cost, I.e. about 15 to 30%, compared to the fuel cost in the coal-generated electricity (40-60%). Or in the oil-generated electricity (70-80%). This situation will give effect that the future generation cost is much less sensitive to the changes in the fuel prince than in the case of fossil fuel power plants. The study has shown that by assuming a 100% increase in the natural uranium price, the total nuclear fuel cycle cost would increase only by about 27% and in turn it contributes about 29% increase to the total nuclear fuel cycle cost. As a result, it contributes only 4 to 8% increase in the nuclear energy generation cost. As a comparison, if the same situation should occur to fossil fuel plants, the assumed fuel price increase would have increased the electricity generating cost by about 40-65% for coal-fired plants, and about 70-85% for oil-fired plants. This study also has assesses the economic aspects of the electricity generating cots for nuclear power plant (NPP) and the coal power plant. For an NPP the most affecting factor is the investment cost, while for the coal power plant, the major factor influencing the total cost is the price/cost of the fuel

  10. Tax shift : eliminating subsidies and moving to full cost electricity pricing

    International Nuclear Information System (INIS)

    Gibbons, J.

    2008-01-01

    In order to ensure that Ontario's service needs are met at the lowest possible total cost, energy conservation and small-scale distributed generation options must be able to compete with large scale-centralized generation and transmission options on a level playing field. This report discussed how electricity is priced in Ontario. The report described the policies that subsidize coal and nuclear generation and promote excessive consumption of grid-supplied electricity. The report also presented an analysis of the impact of these subsidies and policies on Ontario's electricity consumption, electricity productivity, standard of living and air pollutant emissions. It described a practical strategy whereby these subsidies can be eliminated by recycling or shifting the monies currently spent on subsidies in a way that creates an incentive to reduce electricity consumption. It also described how full cost pricing could lead to a net financial benefit for residential customers as well as an adaptation strategy for businesses that would ensure that they remain competitive. Finally the report identified ten major subsidies that artificially reduce the cost of electricity in Ontario. These included below-market water royalty rates; corporate income tax revenue subsidy for nuclear debt; sales tax exemption; average cost pricing; and bulk metering. It was concluded that phasing out the subsidies for grid-supplied electricity and moving to full cost pricing will provide multiple benefits for Ontario. 36 refs., 5 tabs., 5 figs

  11. Our winters of discontent : addressing the problem of rising home heating costs

    International Nuclear Information System (INIS)

    Hughes, L.; Wysocki, A.

    2006-03-01

    The cost of space heating may soon increase due to rising fuel prices in international energy markets and the absence of federal and provincial energy security policies. This report examined the benefits and disadvantages of 2 approaches to assist those with limited incomes to meet heating requirements: (1) offering Low Income Fuel Assistance (LIFA) as a one-time payment during the heating season; and (2) the elimination of taxes for home heating fuels. The cost of home heating fuels and their impacts on consumers and governments were considered. A review of the Nova Scotia government's Keep the Heat program noted that the program was not responsive to increases in the price of home heating fuel, particularly if increases in a year exceeded the level of assistance. It was suggested that the removal of heating sales taxes could provide unnecessary windfalls to households with large homes, as well as windfall profits for landlords if savings were not passed on to tenants. Using Nova Scotia as a case study, an alternative support system was considered that guaranteed a set price for heating fuel for those in need. It was suggested that this approach could cost less than a lump-sum payment or the elimination of taxes on home-heating fuel. In addition, the approach would provide low-income consumers with predictable and affordable prices. It was concluded that as space heating energy costs continue to rise, all government fuel assistance programs run the risk of becoming larger and more costly. Other solutions included reducing Canada's dependence on fossil fuels through the use of solar energy; the reduction of residential energy demand; and the promotion of district heating. 26 refs., 9 tabs., 3 figs

  12. Long-term impacts of battery electric vehicles on the German electricity system

    Science.gov (United States)

    Heinrichs, H. U.; Jochem, P.

    2016-05-01

    The emerging market for electric vehicles gives rise to an additional electricity demand. This new electricity demand will affect the electricity system. For quantifying those impacts a model-based approach, which covers long-term time horizons is necessary in order to consider the long lasting investment paths in electricity systems and the market development of electric mobility. Therefore, we apply a bottom-up electricity system model showing a detailed spatial resolution for different development paths of electric mobility in Germany until 2030. This model is based on a linear optimization which minimizes the discounted costs of the electricity system. We observe an increase of electricity exchange between countries and electricity generated by renewable energy sources. One major result turns out to be that electric vehicles can be integrated in the electricity system without increasing the system costs when a controlled (postponing) charging strategy for electric vehicles is applied. The impact on the power plant portfolio is insignificant. Another important side effect of electric vehicles is their substantial contribution to decreasing CO2 emissions of the German transport sector. Hence, electric mobility might be an integral part of a sustainable energy system of tomorrow.

  13. Paying the full cost of power : an indicative comparative analysis of residential electricity rates across Canadian provinces

    International Nuclear Information System (INIS)

    Goulding, A.J.; Sabatier, G.

    2005-01-01

    This study was commissioned to review electricity rates charged to residential consumers across Canada and to determine how the basics of ratemaking change from province to province. Rates in each province vary significantly due to differences in the industry structure and their resource base. It was noted that direct comparisons are difficult because some rates reflect the financing, fuel and opportunity costs of power. For that reason, a simple adjustment factor was developed for fair comparison between jurisdictions. This assessment compared the all-in cost to final consumers which includes power generation, transmission, distribution and all other charges, as calculated by Statistics Canada. It was revealed that Alberta is Canada's only province where prices to final consumers reflect the market value of the underlying commodity. Ratepayers have the advantage of not being responsible for bad investment choices in the power sector and there are no hidden subsidies due to provincial ownership of power resources. Another consumer advantage is that they receive appropriate price signals in terms of energy consumption and conservation. This report suggests that low electricity rates in other provinces can be expected to rise much more rapidly than those in Alberta in the coming decade as consumers may be charged the full value of the electricity they use. 18 refs., 9 figs

  14. The true cost of electric power. Summary for policymakers

    Energy Technology Data Exchange (ETDEWEB)

    Burtraw, Dallas; Knupnick, Alan [Resources for the Future, Washington, DC (United States). Center for Energy Economics and Policy

    2012-06-15

    This report examines the various methods that have been used to measure 'true' costs of electricity generation technologies and looks at how such estimates can be used in company decision-making and public policy to ensure that investments are directed at the electricity generation methods with the lowest true costs to investors and society. In some geographic areas, adequate data and methods exist to make a solid estimate of the total social costs of energy production. In those places where the data or methods (or both) are less robust, it is possible to use a benefits transfer approach that still gives stakeholders important guidance about the scale of the true costs of their investments and to get started in formulating policies to incorporate those costs into the market price.

  15. Electricity-cost savings obtained by means of nuclear plant life extension

    International Nuclear Information System (INIS)

    Forest, L.; Fletcher, T.; DuCharme, A.; Harrison, D.L.

    1987-01-01

    This study examines savings caused by nuclear-plant life extension (NUPLEX) and describes the effects of changes in assumptions on costs and technology using an approach simpler than the large economic-model simulations used in other reports. Under the simplified approach, we estimate savings at the broad national level by comparing projected costs/kWh for the typical NUPLEX plant with those for new coal-fired plants, which seem the most likely alternative in most regions. While ignoring some complications handled by the large, regionally disaggregated econometric models, the approach used in this study has advantages in sensitivity analyses. It reveals relationships between savings and basic assumptions on costs and technology in a more transparent way than in large-model simulations. We find that, absent major technological breakthroughs for present generating options, NUPLEX saves consumers money on their electric bills under most plausible economic scenarios. Using mid-range assumptions, we find that NUPLEX saves consumers a total of about dollar 180 billion spread over the period 2010-50. Under optimistic assumptions, the savings swell to over dollar 900 billion. Under extremely pessimistic assumptions, the savings actually turn negative. This wide range of estimates largely reflects the uncertainty in cost projections. Within plausible limits, higher- or lower-than-expected load growth does not affect the savings estimates. The NUPLEX construction costs stand out as the most critical unknown. If they turn out to be 50% (dollar 500 billion) above the baseline estimate savings would fall by almost 60% (dollar 105 billion). A 50% rise in nuclear fuel costs would drop baseline savings by almost 22%. A 50% increase in nuclear-plant operations-and-maintenance costs, would cut baseline savings by about 36%. These sensitivities highlight the need for continued monitoring of economic developments

  16. Cost analysis of electrical power from an ethanol reformer and the fuel cell in the development of productive activities in the community Pico do Amor, MT, Brazil

    International Nuclear Information System (INIS)

    Lopes, Davi Gabriel; Teixeira, Andre Frazao; Lopes, Daniel Gabriel; Cavaliero, Carla Kazue Nakao

    2010-01-01

    This work has the objective to analyze the impact of the cost of from an ethane reformer / fuel cell in the family income considering the development of two productive activities selected by the community itself: the production and marketing of cassava flour and 'rapadura', a typical brazilian candy. The community energy demand was analyzed to achieve the results; estimated the energy cost from the implemented system and the money from the selling of the cassava flour and 'rapadura' produced with this electricity; the study of sensibility of the ethanol price in the electrical energy cost was done too, and the cassava flour and 'rapadura' in the family funds. From the results, it was verified that the electrical energy cost has a 16,4% impact in the family gross income and a net value around R$ 260,85/family, indicating that the community will have enough funds to pay for the energy and also will rise the amount of money for each family. Besides, the comparative analyze of the cost of the electricity from the ethanol/fuel cell reformer and photovoltaic systems shows that, considering only the maintenance and operation costs, the first one should be more attractive than the second one. (author)

  17. LPGC, Levelized Steam Electric Power Generator Cost

    International Nuclear Information System (INIS)

    Coen, J.J.; Delene, J.G.

    1994-01-01

    1 - Description of program or function: LPGC is a set of nine microcomputer programs for estimating power generation costs for large steam-electric power plants. These programs permit rapid evaluation using various sets of economic and technical ground rules. The levelized power generation costs calculated may be used to compare the relative economics of nuclear and coal-fired plants based on life-cycle costs. Cost calculations include capital investment cost, operation and maintenance cost, fuel cycle cost, decommissioning cost, and total levelized power generation cost. These programs can be used for quick analyses of power generation costs using alternative economic parameters, such as interest rate, escalation rate, inflation rate, plant lead times, capacity factor, fuel prices, etc. The two major types of electric generating plants considered are pressurized-water reactor (PWR) and pulverized coal-fired plants. Data are also provided for the Large Scale Prototype Breeder (LSPB) type liquid metal reactor. Costs for plant having either one or two units may be obtained. 2 - Method of solution: LPGC consists of nine individual menu-driven programs controlled by a driver program, MAINPWR. The individual programs are PLANTCAP, for calculating capital investment costs; NUCLOM, for determining operation and maintenance (O and M) costs for nuclear plants; COALOM, for computing O and M costs for coal-fired plants; NFUEL, for calculating levelized fuel costs for nuclear plants; COALCOST, for determining levelized fuel costs for coal-fired plants; FCRATE, for computing the fixed charge rate on the capital investment; LEVEL, for calculating levelized power generation costs; CAPITAL, for determining capitalized cost from overnight cost; and MASSGEN, for generating, deleting, or changing fuel cycle mass balance data for use with NFUEL. LPGC has three modes of operation. In the first, each individual code can be executed independently to determine one aspect of the total

  18. The effects of utility DSM programs on electricity costs and prices

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.

    1991-11-01

    More and more US utilities are running more and larger demand-side management (DSM) programs. Assessing the cost-effectiveness of these programs raises difficult questions for utilities and their regulators. Should these programs aim to minimize the total cost of providing electric-energy services or should they minimize the price of electricity? This study offers quantitative estimates on the tradeoffs between total costs and electricity prices. This study uses a dynamic model to assess the effects of energy-efficiency programs on utility revenues, total resource costs, electricity prices, and electricity consumption for the period 1990 to 2010. These DSM programs are assessed under alternative scenarios. In these cases, fossil-fuel prices, load growth, the amount of excess capacity the utility has in 1990, planned retirements of power plants, the financial treatment of DSM programs, and the costs of energy- efficient programs vary. These analyses are conducted for three utilities: a ``base`` that is typical of US utilities; a ``surplus`` utility that has excess capacity, few planned retirements, and slow growth in fossil-fuel prices and incomes; and a ``deficit`` utility that has little excess capacity, many planned retirements, and rapid growth in fossil-fuel prices and incomes. 28 refs.

  19. Bulk Electric Load Cost Calculation Methods: Iraqi Network Comparative Study

    Directory of Open Access Journals (Sweden)

    Qais M. Alias

    2016-09-01

    Full Text Available It is vital in any industry to regain the spent capitals plus running costs and a margin of profits for the industry to flourish. The electricity industry is an everyday life touching industry which follows the same finance-economic strategy. Cost allocation is a major issue in all sectors of the electric industry, viz, generation, transmission and distribution. Generation and distribution service costing’s well documented in the literature, while the transmission share is still of need for research. In this work, the cost of supplying a bulk electric load connected to the EHV system is calculated. A sample basic lump-average method is used to provide a rough costing guide. Also, two transmission pricing methods are employed, namely, the postage-stamp and the load-flow based MW-distance methods to calculate transmission share in the total cost of each individual bulk load. The three costing methods results are then analyzed and compared for the 400kV Iraqi power grid considered for a case study.

  20. Electric vehicle life cycle cost analysis : final research project report.

    Science.gov (United States)

    2017-02-01

    This project compared total life cycle costs of battery electric vehicles (BEV), plug-in hybrid electric vehicles (PHEV), hybrid electric vehicles (HEV), and vehicles with internal combustion engines (ICE). The analysis considered capital and operati...

  1. The emergence of rural transport strategies in response to rising fuel costs

    International Nuclear Information System (INIS)

    Shapiro, Dana; Pearlmutter, David; Schwartz, Moshe

    2012-01-01

    Rising and sometimes volatile fuel prices pose a challenge for rural organizations reliant on long distance transport. To understand the coping mechanisms used by such organizations, we survey rural business strategies in Israel, where fuel prices are high and urban development is concentrated in the country's geographic center. The businesses surveyed are operated by kibbutzim, historically collective communities that are now in various stages of privatization. Analysis of the ‘transport strategies’ employed by nearly 100 organizations in three regions of varying remoteness and isolation shows that firms rely on distinct strategies such as localization and high value density. Localization was found to be prevalent in all regions, as it requires little capital investment. Strategies exploiting high value density, including information-based services, were prevalent in remote and isolated regions where sensitivity to transport costs is acute. Non-remote firms were less inclined toward strategic adaptation, preferring non-disruptive changes such as cheaper shipping modes. The development implications of these transport strategies are consistent with rural economic trends observed throughout the developed world. If transport costs continue to rise, rural firms may shrink the radius of their sales and labor pools, or search for more lucrative products to reduce their relative transport costs. - Highlights: ► We survey transport strategies used by rural businesses in Israeli kibbutzim. ► The seven distinct strategies identified include localization and value density. ► Localization is used in all regions and value density in remote and isolated regions. ► Development implications are consistent with economic trends in other rural regions. ► Rural firms will likely respond to high fuel costs by strategic transport adaptation.

  2. Development costs for a nuclear electric propulsion stage.

    Science.gov (United States)

    Mondt, J. F.; Prickett, W. Z.

    1973-01-01

    Development costs are presented for an unmanned nuclear electric propulsion (NEP) stage based upon a liquid metal cooled, in-core thermionic reactor. A total of 120 kWe are delivered to the thrust subsystem which employs mercury ion engines for electric propulsion. This study represents the most recent cost evaluation of the development of a reactor power system for a wide range of nuclear space power applications. These include geocentric, and outer planet and other deep space missions. The development program is described for the total NEP stage, based upon specific development programs for key NEP stage components and subsystems.

  3. LCA and external costs in comparative assessment of electricity chains. Decision support for sustainable electricity provision?

    International Nuclear Information System (INIS)

    Voss, A.

    2002-01-01

    The provision of energy and electricity plays an important role in a country's economic and environmental performance and the sustainability of its development. Sustainable development of the energy and electricity sector depends on finding ways of meeting energy service demands of the present generation that are economically viable, environmentally sound, and socially acceptable and do not jeopardize the ability of future generations to meet their own energy needs. Life Cycle Assessment (LCA) and external cost valuation are considered to offer opportunities to assist energy policy in a comprehensive comparative evaluation of electricity supply options with regard to the different dimensions of sustainable energy provision as well as in the implementation of appropriate internalization strategies. The paper addresses life cycle assessment and external cost analysis carried out for selected electricity systems of interest under German conditions. Results from a comprehensive comparative assessment of various electricity supply options with regard to their environmental impacts, health risks, raw materials requirements as well as their resulting external cost will be summarised. The use of LCA based indicators for assessing the relative sustainability of electricity systems and the use of total (internal plus external) cost assessment as measure of economic and environmental efficiency of energy systems will be discussed. Open problems related to life cycle analysis of energy chains and the assessment of environmental damage costs are critically reviewed, to illustrate how in spite of existing uncertainties the state of the art results may provide helpful energy policy decision support. The paper starts with some remarks on what the concept of sustainability in terms of energy systems means. (author)

  4. Climate change and electricity consumption-Witnessing increasing or decreasing use and costs?

    International Nuclear Information System (INIS)

    Pilli-Sihvola, Karoliina; Aatola, Piia; Ollikainen, Markku; Tuomenvirta, Heikki

    2010-01-01

    Climate change affects the need for heating and cooling. This paper examines the impact of gradually warming climate on the need for heating and cooling with an econometric multivariate regression model for five countries in Europe along the south-north line. The predicted changes in electricity demand are then used to analyze how climate change impacts the cost of electricity use, including carbon costs. Our main findings are, that in Central and North Europe, the decrease in heating due to climate warming, dominates and thus costs will decrease for both users of electricity and in carbon markets. In Southern Europe climate warming, and the consequential increase in cooling and electricity demand, overcomes the decreased need for heating. Therefore costs also increase. The main contributors are the role of electricity in heating and cooling, and the climatic zone.

  5. Cost-benefit analysis of electrical vehicles. Cars

    International Nuclear Information System (INIS)

    Taszka, Stephane; Domergue, Silvano; Poret, Mathilde; Monnoyer-Smith, Laurence

    2017-07-01

    This study aims at assessing technologies of electrical or hybrid vehicle from a social-economic point of view as well as from a user's point of view by 2020 and 2030, and thus at identifying relevant fields for these technologies. After having recalled some elements of context (Paris agreement, climate change issues for which transport is an important matter of concern, necessity to reduce CO 2 emissions, atmospheric pollution, and sound pollutions), and envisaged solutions (technological advances in engines and motorizations, evolution of mobility behaviours, use of alternate fuels and more particularly of electric and hybrid vehicles), the authors report a social-economic analysis which compares costs and benefits while taking environmental externalities into account, and an analysis of consumer's or user's point of view by using a total cost of ownership (TCO) approach which takes taxation into account. Four technologies are thus studied: thermal vehicles (petrol and diesel), hybrid vehicles, reloadable hybrid vehicles, and fully electrical vehicles. The implemented methodology and general hypotheses are presented. Results are presented and discussed. They show that an electric vehicle could be already profitable in a dense urban environment in 2020, and hybrid technology in 2030. A mixed use (electric propulsion in urban environment, thermal propulsion for inter-urban trips) seems to be the best solution before these both horizons. The study also reports some elements of assessment of the 'smart grid' value of electric vehicle batteries. Appendices propose detailed assessments and indications of sources of pollutant emissions

  6. Model of investment appraisal of high-rise construction with account of cost of land resources

    Science.gov (United States)

    Okolelova, Ella; Shibaeva, Marina; Trukhina, Natalya

    2018-03-01

    The article considers problems and potential of high-rise construction as a global urbanization. The results of theoretical and practical studies on the appraisal of investments in high-rise construction are provided. High-rise construction has a number of apparent upsides in modern terms of development of megapolises and primarily it is economically efficient. Amid serious lack of construction sites, skyscrapers successfully deal with the need of manufacturing, office and living premises. Nevertheless, there are plenty issues, which are related with high-rise construction, and only thorough scrutiny of them allow to estimate the real economic efficiency of this branch. The article focuses on the question of economic efficiency of high-rise construction. The suggested model allows adjusting the parameters of a facility under construction, setting the tone for market value as well as the coefficient for appreciation of the construction net cost, that depends on the number of storey's, in the form of function or discrete values.

  7. Analysis on the cost performance and its impact to Japanese electric utilities and vision of the power portfolio

    International Nuclear Information System (INIS)

    Yamaguchi, Yuji; Matsuo, Yuji; Murakami, Tomoko

    2013-01-01

    Most of the nuclear power plants in Japan have been shut down since the Fukushima accident in March 2011, without being permitted to restart after periodical inspections. Accordingly, thermal power generation significantly increased in FY 2011. In this paper the authors made a quantitative analysis on the unit costs of power generation and on the financial performance based on the financial reports of electric utilities. The average unit cost in FY 2011 rose to 11.6 JPY/kWh, 3 JPY/kWh higher than that in FY 2010, and will rise further to 12.6 JPY/kWh in FY 2012. The total retained profit of 8 utilities decreased by some 1 trillion JPY from FY 2010 to FY 2011 and will decrease further to 1 trillion JPY by the end of FY 2012, which is the lowest level in history. Clear decisions on energy policies and future power portfolio, as well as the restructuring of the electricity system in line with the rapid change in the power portfolio will be highly required for policy planners in Japan. (author)

  8. The effects of utility DSM programs on electricity costs and prices

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.

    1991-11-01

    More and more US utilities are running more and larger demand-side management (DSM) programs. Assessing the cost-effectiveness of these programs raises difficult questions for utilities and their regulators. Should these programs aim to minimize the total cost of providing electric-energy services or should they minimize the price of electricity This study offers quantitative estimates on the tradeoffs between total costs and electricity prices. This study uses a dynamic model to assess the effects of energy-efficiency programs on utility revenues, total resource costs, electricity prices, and electricity consumption for the period 1990 to 2010. These DSM programs are assessed under alternative scenarios. In these cases, fossil-fuel prices, load growth, the amount of excess capacity the utility has in 1990, planned retirements of power plants, the financial treatment of DSM programs, and the costs of energy- efficient programs vary. These analyses are conducted for three utilities: a base'' that is typical of US utilities; a surplus'' utility that has excess capacity, few planned retirements, and slow growth in fossil-fuel prices and incomes; and a deficit'' utility that has little excess capacity, many planned retirements, and rapid growth in fossil-fuel prices and incomes. 28 refs.

  9. How does the rise of China affect Malaysia's electronic and electrical sector?

    OpenAIRE

    Ting, Onn

    2016-01-01

    After joining the WTO in 2001, China’s total exports grew by 19.3% per annum up to 2013 and the country emerged as the world’s biggest exporter of manufactured electronics. China’s rise has had an impact on developing countries such as Malaysia, a major exporter of electronic and electrical (E&E) goods. Malaysia aims to be a high-income economy by 2020, and upgrading its E&E value chain is critical to this goal. Malaysia is part of the East Asian production network and China imports intermedi...

  10. Energy subsidies and costs in urban Ethiopia: The cases of kerosene and electricity

    Energy Technology Data Exchange (ETDEWEB)

    Kebede, Bereket [School of Development Studies, University of East Anglia, Norwich NR4 7TJ (United Kingdom)

    2006-10-15

    Making energy affordable to the poor is a widely cited reason for subsidies. Whether subsidies achieve this objective is rarely analysed. In this article, the significance of kerosene and electricity subsidies in relation to the purchasing power of Ethiopian urban households is examined. The results indicate that subsidies on kerosene prices and electricity tariffs do not significantly change the overall costs for households. Even poor households on the average have the purchasing power to access unsubsidised kerosene. The overall costs-including fixed costs-of accessing electricity are very high relative to purchasing power even for the well to do urban households if down payments are made. But when costs are spread over the lifespan of fixed components, even the average poor have the purchasing power to access electricity. These results underscore the importance of a mechanism that spreads fixed costs over longer periods of time. Spreading fixed costs over electricity bills and providing credit facilities are two options that can ameliorate the condition. (author)

  11. Cost structure of coal- and nuclear-fired electric power plants

    International Nuclear Information System (INIS)

    Helmuth, J.A.

    1981-01-01

    This dissertation investigates the cost structure of coal and nuclear electric power generation. The emphasis of the paper is to empirically estimate the direct costs of generating base-load electric power at the plant level. Empirically, the paper first investigates the relative comparative costs of nuclear and coal power generation, based on historical operating data. Consideration of the learning curve and other dynamic elements is incorporated in the analysis. The second empirical thrust is to inestigate economies of scale for both technologies. The results from the empirical studies give an indication as to the future and present cost viability of each technology. Implications toward energy policy are discussed

  12. POWERCO, Nuclear Power Plant Electricity Cost and Economics

    International Nuclear Information System (INIS)

    Tyson, Frank D.

    1982-01-01

    1 - Description of problem or function: POWERCO calculates the cost of electricity produced by nuclear power stations, assuming all cash expenses such as investment and fuel costs, operating expenses, and taxes are known. The power cost is held constant throughout the project life. 2 - Method of solution: The cost calculation is based on the requirement that income received must provide for recovery of investment, return on investment, and all operating expenses. Equations are developed to calculate true fixed charge rates and true average fuel working capital

  13. Regional projections of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1983-12-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base load nuclear and coal-fired power plants with a startup date of January 1995. A complete data set is supplied which specifies each parameter used to obtain the comparative results. When the comparison is based on reference cost parameters, nuclear- and coal-fired generation costs are found to be very close in most regions of the country. Nuclear power is favored in the South Atlantic region where coal must be transported over long distances, while coal-fired generation is favored in the Central and North Central regions where large reserves of cheaply mineable coal exist. The reference data set reflects recent electric utility construction experience. Significantly lower nuclear capital investment costs would result if regulatory reform and improved construction practices were instituted. The electric power generation costs for base load oil- and natural gas-fired plants were also estimated. These plants were found to be noncompetitive in all regions for those scenarios most likely to develop. Generation cost sensitivity to changes in various parameters was examined at a reference location. The sensitivity parameters included capital investment costs, lead times, capacity factors, costs of money, and coal and uranium prices. In addition to the levelized lifetime costs, year-by-year cash flows and revenue requirements are presented. The report concludes with an analysis of the economic merits of recycling spent fuel in light-water reactors

  14. Electricity exports: Discussion of provincial economic benefits and costs

    International Nuclear Information System (INIS)

    1993-01-01

    A review was conducted by the British Columbia Energy Council to assess the economic and social impacts of the export of long-term firm electricity to the USA and the distribution of these impacts. The objectives of, and the differences between, benefit-cost and socio-economic impact analysis are discussed as they apply to potential electricity export projects. Provincial export project review requirements (project justification, environmental impacts, socio-economic impact assessment) and proposed legislative changes are first reviewed. The concepts and objectives of value added, economic rent, opportunity costs, economic (benefit-cost) analysis, and socio-economic impact analysis are explained. Employment issues including unemployed labor, employment benefits, and regional and occupational considerations are then discussed, as well as transfers to various levels of government in the form of taxes, subsidies, resource royalties, and depletion costs. 8 refs., 4 tabs

  15. Electric infrastructure failures in Nigeria: a survey-based analysis of the costs and adjustment responses

    International Nuclear Information System (INIS)

    Adenikinju, A.F.

    2003-01-01

    This paper examines the cost of electricity shortages on the Nigerian manufacturing sector. Utilizing the data obtained from a 1998 nationwide survey, the paper details the various costs from power outages and examines the response of manufacturers to the infrastructure problem. The findings of the study confirm that the cost of electricity failures on the Nigerian manufacturing sector is quite high. Firms incur huge costs on the provision of expensive back-up to minimise the expected outage costs. The average costs of this back-up are on the average 3 times the cost of publicly supplied electricity. The marginal cost estimates also indicate that the cost of kWh of unserved electricity in Nigeria is very high. Small-scale firms bear the greater proportion of the cost of the power failure. A situation where firms spend as much as 20-30% of initial investment on the acquisition of facilities to enhance electricity supply reliability has a significant negative impact on costs competitiveness of the manufacturing sector. Thus, the study supports current government efforts to privatise the public monopoly and liberalizes the electricity market. These hopefully will mitigate the burden of poor power supply as well as introduce the needed competition into the electricity market in the country

  16. Rising food costs & global food security: Key issues & relevance for India

    Science.gov (United States)

    Gustafson, Daniel J.

    2013-01-01

    Rising food costs can have major impact on vulnerable households, pushing those least able to cope further into poverty and hunger. On the other hand, provided appropriate policies and infrastructure are in place, higher agricultural prices can also raise farmers’ incomes and rural wages, improve rural economies and stimulate investment for longer-term economic growth. High food prices since 2007 have had both short-term impacts and long-term consequences, both good and bad. This article reviews the evidence of how rising costs have affected global food security since the food price crisis of 2007-2008, and their impact on different categories of households and countries. In light of recent studies, we know more about how households, and countries, cope or not with food price shocks but a number of contentious issues remain. These include the adequacy of current estimates and the interpretation of national and household food and nutrition security indicators. India is a particularly important country in this regard, given the high number of food insecure, the relative weight of India in global estimates of food and nutrition insecurity, and the puzzles that remain concerning the country's reported declining per capita calorie consumption. Competing explanations for what is behind it are not in agreement, but these all point to the importance of policy and programme innovation and greater investment necessary to reach the achievable goal of food and nutrition security for all. PMID:24135190

  17. Rising food costs & global food security: Key issues & relevance for India

    Directory of Open Access Journals (Sweden)

    Daniel J Gustafson

    2013-01-01

    Full Text Available Rising food costs can have major impact on vulnerable households, pushing those least able to cope further into poverty and hunger. On the other hand, provided appropriate policies and infrastructure are in place, higher agricultural prices can also raise farmers′ incomes and rural wages, improve rural economies and stimulate investment for longer-term economic growth. High food prices since 2007 have had both short-term impacts and long-term consequences, both good and bad. This article reviews the evidence of how rising costs have affected global food security since the food price crisis of 2007-2008, and their impact on different categories of households and countries. In light of recent studies, we know more about how households, and countries, cope or not with food price shocks but a number of contentious issues remain. These include the adequacy of current estimates and the interpretation of national and household food and nutrition security indicators. India is a particularly important country in this regard, given the high number of food insecure, the relative weight of India in global estimates of food and nutrition insecurity, and the puzzles that remain concerning the country′s reported declining per capita calorie consumption. Competing explanations for what is behind it are not in agreement, but these all point to the importance of policy and programme innovation and greater investment necessary to reach the achievable goal of food and nutrition security for all.

  18. Rising food costs & global food security: key issues & relevance for India.

    Science.gov (United States)

    Gustafson, Daniel J

    2013-09-01

    Rising food costs can have major impact on vulnerable households, pushing those least able to cope further into poverty and hunger. On the other hand, provided appropriate policies and infrastructure are in place, higher agricultural prices can also raise farmers' incomes and rural wages, improve rural economies and stimulate investment for longer-term economic growth. High food prices since 2007 have had both short-term impacts and long-term consequences, both good and bad. This article reviews the evidence of how rising costs have affected global food security since the food price crisis of 2007-2008, and their impact on different categories of households and countries. In light of recent studies, we know more about how households, and countries, cope or not with food price shocks but a number of contentious issues remain. These include the adequacy of current estimates and the interpretation of national and household food and nutrition security indicators. India is a particularly important country in this regard, given the high number of food insecure, the relative weight of India in global estimates of food and nutrition insecurity, and the puzzles that remain concerning the country's reported declining per capita calorie consumption. Competing explanations for what is behind it are not in agreement, but these all point to the importance of policy and programme innovation and greater investment necessary to reach the achievable goal of food and nutrition security for all.

  19. Beyond free electricity: the costs of electric cooking in poor households and a market-friendly alternative

    International Nuclear Information System (INIS)

    Howells, M.; Alfstad, T.; Victor, D.G.; Elias, R.J.; Gaunt, T.

    2006-01-01

    The South African government is introducing a poverty-reduction policy that will supply households with a monthly 50 kWh free basic electricity (FBE) subsidy. We show that FBE distorts the energy choices of poor households by encouraging them to cook with electricity, whereas alternatives such as liquefied petroleum gas (LPG) can deliver a similar cooking service at a much lower cost to society. An alternative energy scheme, such as providing households with clean energy credits equivalent in value to the FBE's cost, could deliver additional energy services worth at least 6% of total household welfare (and probably much more) at no additional public cost; those benefits are so large that they would cover the entire cost of LPG fuel needed to implement the scheme. The analysis is extremely sensitive to the coincidence of electric cooking with peak power demand on the South African grid and to assumptions regarding how South Africa will meet its looming shortfall in peak power capacity. One danger of FBE is that actual peak coincidence and the costs of supplying peak power could be much less favorable than we assume, and such uncertainties expose the South African power system to potentially very high costs of service. (author)

  20. Beyond free electricity: The costs of electric cooking in poor households and a market-friendly alternative

    International Nuclear Information System (INIS)

    Howells, Mark; Victor, David G.; Gaunt, Trevor; Elias, Rebecca J.; Alfstad, Thomas

    2006-01-01

    The South African government is introducing a poverty-reduction policy that will supply households with a monthly 50 kWh free basic electricity (FBE) subsidy. We show that FBE distorts the energy choices of poor households by encouraging them to cook with electricity, whereas alternatives such as liquefied petroleum gas (LPG) can deliver a similar cooking service at a much lower cost to society. An alternative energy scheme, such as providing households with clean energy credits equivalent in value to the FBE's cost, could deliver additional energy services worth at least 6% of total household welfare (and probably much more) at no additional public cost; those benefits are so large that they would cover the entire cost of LPG fuel needed to implement the scheme. The analysis is extremely sensitive to the coincidence of electric cooking with peak power demand on the South African grid and to assumptions regarding how South Africa will meet its looming shortfall in peak power capacity. One danger of FBE is that actual peak coincidence and the costs of supplying peak power could be much less favorable than we assume, and such uncertainties expose the South African power system to potentially very high costs of service

  1. The role of capital costs in decarbonizing the electricity sector

    Science.gov (United States)

    Hirth, Lion; Steckel, Jan Christoph

    2016-11-01

    Low-carbon electricity generation, i.e. renewable energy, nuclear power and carbon capture and storage, is more capital intensive than electricity generation through carbon emitting fossil fuel power stations. High capital costs, expressed as high weighted average cost of capital (WACC), thus tend to encourage the use of fossil fuels. To achieve the same degree of decarbonization, countries with high capital costs therefore need to impose a higher price on carbon emissions than countries with low capital costs. This is particularly relevant for developing and emerging economies, where capital costs tend to be higher than in rich countries. In this paper we quantitatively evaluate how high capital costs impact the transformation of the energy system under climate policy, applying a numerical techno-economic model of the power system. We find that high capital costs can significantly reduce the effectiveness of carbon prices: if carbon emissions are priced at USD 50 per ton and the WACC is 3%, the cost-optimal electricity mix comprises 40% renewable energy. At the same carbon price and a WACC of 15%, the cost-optimal mix comprises almost no renewable energy. At 15% WACC, there is no significant emission mitigation with carbon pricing up to USD 50 per ton, but at 3% WACC and the same carbon price, emissions are reduced by almost half. These results have implications for climate policy; carbon pricing might need to be combined with policies to reduce capital costs of low-carbon options in order to decarbonize power systems.

  2. Avoiding adverse employment effects from electricity taxation in Norway: What does it cost?

    International Nuclear Information System (INIS)

    Bjertnaes, Geir H.

    2011-01-01

    Welfare analyses of energy taxes typically show that systems with uniform rates perform better than differentiated systems. However, most western countries include some exemptions for their energy-intensive export industries and thereby avoid this potential welfare gain. find that uniform taxation of carbon emissions in combination with a wage subsidy preserves jobs in these industries at a lower welfare cost compared with a differentiated system. The wage subsidy scheme generates a substantial welfare gain per job saved. This study, however, finds that welfare costs are substantial when less accurate policy measures, represented by production-dependent subsidies, protect jobs in Norwegian electricity-intensive industries. The welfare cost per job preserved by this subsidy scheme amounts to approximately 60% of the wage cost per job, suggesting that these jobs are expensive to preserve. A uniform electricity tax combined with production-dependent subsidies preserves jobs at a lower welfare cost compared with the current differentiated electricity tax system. - Highlights: → Avoiding adverse employment effects from electricity taxation is costly in Norway. → Uniform Norwegian electricity tax with job-preserving subsidies improves welfare. → The welfare cost of Norwegian job-saving subsidies amounts to 60% of the wage.

  3. External costs from electricity generation of China up to 2030 in energy and abatement scenarios

    International Nuclear Information System (INIS)

    Zhang, Qingyu; Weili, Tian; Yumei, Wei; Yingxu, Chen

    2007-01-01

    This paper presents estimated external costs of electricity generation in China under different scenarios of long-term energy and environmental policies. Long-range Energy Alternatives Planning (LEAP) software is used to develop a simple model of electricity demand and to estimate gross electricity generation in China up to 2030 under these scenarios. Because external costs for unit of electricity from fossil fuel will vary in different government regulation periods, airborne pollutant external costs of SO 2 , NO x , PM 10 , and CO 2 from fired power plants are then estimated based on emission inventories and environmental cost for unit of pollutants, while external costs of non-fossil power generation are evaluated with external cost for unit of electricity. The developed model is run to study the impact of different energy efficiency and environmental abatement policy initiatives that would reduce total energy requirement and also reduce external costs of electricity generation. It is shown that external costs of electricity generation may reduce 24-55% with three energy policies scenarios and may further reduce by 20.9-26.7% with two environmental policies scenarios. The total reduction of external costs may reach 58.2%. (author)

  4. Cost-benefit analysis of reforming Israel's electricity industry

    International Nuclear Information System (INIS)

    Tishler, A.; Newman, J.; Spekterman, I.; Woo, C.K.

    2006-01-01

    In June 2003, the Israeli government decided to reform the Israeli electricity industry, which is currently dominated by Israel electric corporation (IEC), a government-owned vertically integrated electric utility. The first step of the planned reform will be taken in 2006, when IEC will be functionally separated into generation, transmission, local distribution, and customer services. Immediately thereafter will be the second step, which by 2012 will result in the deregulation and privatization of the wholesale generation and customer services. Transmission and distribution (T and D) services will remain regulated but will be available to all T and D users under mandatory open access. This paper summarizes a cost-benefit analysis of the government's reform plan. Relative to a regulated regime, the government's plan, even if carried out flawlessly, may only yield a small net benefit. However, it entails a large increase in electricity producer profit and government tax receipt, at the expense of electricity consumers. A less-than-perfect transition to competition can easily wipe out the potential gain of the government plan. Market reform experience to date shows that electricity market reform can easily fail, and the factors for success do not exist in Israel. Since the outcome of a failing reform can be disastrous, it will be imprudent to implement the government's plan in 2006, when the current electricity law expires. Hence, we recommend performance-based regulation for the period of 2006-2010. Subject to an updated cost-benefit analysis, possible decentralization, privatization and competition may follow

  5. Modelling the impact of EVs on electricity generation, costs and CO2 emissions

    International Nuclear Information System (INIS)

    Calnan, P.; Deane, J.P.; Ó Gallachóir, B.P.

    2013-01-01

    This paper focuses on the impact of electric vehicles on electricity generation in Ireland in 2025 based on five alternative generation portfolios. The year 2025 was selected for assessment due to the information on the composition of the five generation portfolios from Eirgrid the system operator in Ireland being provided. Detailed market simulations were undertaken on the five possible generation portfolios to assess the impact of the Government targets for electric vehicles on the generation costs, emissions, generation stack and the cost to load of this additional demand. This paper also studied the impact between a standard and least cost electric vehicle loading regime to ascertain the benefits that could be achieved. The results show that gas will be the dominant source of electricity generation to load electric vehicles and that wind as an electricity source will experience a minor reduction in curtailment, with the least cost charging profile showing a more pronounced reduction. The capital benefits of the Standard and Least Cost EV load are found to be negligible. The portfolios studied generated CO 2 emissions per kilometre between 52 and 70 gCO 2 /km. All portfolios with the exception of coal were found to comply with EU regulation 443/2009. - Highlights: • This paper focuses on the impact of electric vehicles on electricity generation in Ireland in 2025. • It uses the PLEXOS software package by Energy Exemplar to model the Irish electricity market. • Government targets for electric vehicle penetration have a limited impact on the power system. • Electric vehicles will meet EU requirements in terms of emissions created per kilometre

  6. Cost effects of international trade in meeting EU renewable electricity targets

    International Nuclear Information System (INIS)

    Voogt, M.H.; Uyterlinde, M.A.

    2006-01-01

    The European market for renewable electricity received a major stimulus from the adoption of the Directive on the Promotion of Renewable Electricity. The Directive specifies the indicative targets for electricity supply from renewable energy sources (RES-E) to be reached in European Union (EU) Member States in the year 2010. It also requires Member States to certify the origin of their renewable electricity production. This article presents a first EU-wide quantitative evaluation of the effects of meeting the targets, using an EU-wide system for tradable green certificates (TGC). We calculate the equilibrium price of green certificates and identify which countries are likely to export or import certificates. Cost advantages of participating in such an EU-wide trading scheme are determined for each of the Member States. Moreover, we identify which choice of technologies results in meeting targets at least costs. Results are obtained from a model that quantifies the effects of achieving the RES-E targets in the EU with and without trade. The article provides a brief insight in this model as well as the methodology that was used to specify cost potential curves for renewable electricity in each of the 15 EU Member States. Model calculations show that within the EU-wide TGC system, the total production costs of the last option needed to satisfy the overall EU RES-E target equals 9.2 eurocent/kWh. Assuming that the production price of electricity on the European power market would equal 3 eurocent/kWh in the year 2010, the indicative green certificate price equals 6.2 eurocent/kWh. We conclude that implementation of an EU-wide TGC system is a cost-efficient way of stimulating renewable electricity supply

  7. Energy consumption and cost analysis of hybrid electric powertrain configurations for two wheelers

    International Nuclear Information System (INIS)

    Walker, Paul D.; Roser, Holger M.

    2015-01-01

    Highlights: • We analyse several driving cycles to for the preliminary design of hybrid two wheelers. • Simulation of alternate configurations to compare achievable driving range and economy. • Demonstrate that pure electric vehicles provide cost benefits over the vehicle life. • Hybrid and plug-in hybrid two wheelers have comparable costs to conventional vehicles. - Abstract: The development of hybrid electric two wheelers in recent years has targeted the reduction of on road emissions produced by these vehicles. However, added cost and complexity have resulted in the failure of these systems to meet consumer expectations. This paper presents a comparative study of the energy economy and essential costs of alternative forms of small two wheelers such as scooters or low capacity motorcycles. This includes conventional, hybrid, plug-in hybrid and electric variants. Through simulations of vehicle driving range using two popular driving cycles it is demonstrated that there is considerable benefit in fuel economy realised by hybridising such vehicles. However, the added costs associated with electrification, i.e. motor/generator, power electronics, and energy storage provide a significant cost obstacle to the purchase of such vehicles. Only the pure electric configuration is demonstrated to be cost effective over its life in comparison to conventional two wheelers. Both the hybrid electric and plug-in equivalents must overcome significant upfront costs to be cost competitive with conventional vehicles. This is demonstrated to be achieved if the annual driving range of the vehicle is increased substantially from the assumed mean. Given the shorter distances travelled by most two wheeler drivers it can therefore be concluded that the development of similar hybrid electric vehicles are unlikely to achieve the desired acceptance that pure electric or conventional equivalents currently achieve

  8. Electricity prices in a competitive environment: Marginal cost pricing of generation services and financial status of electric utilities. A preliminary analysis through 2015

    International Nuclear Information System (INIS)

    1997-08-01

    The emergence of competitive markets for electricity generation services is changing the way that electricity is and will be priced in the United States. This report presents the results of an analysis that focuses on two questions: (1) How are prices for competitive generation services likely to differ from regulated prices if competitive prices are based on marginal costs rather than regulated open-quotes cost-of-serviceclose quotes pricing? (2) What impacts will the competitive pricing of generation services (based on marginal costs) have on electricity consumption patterns, production costs, and the financial integrity patterns, production costs, and the financial integrity of electricity suppliers? This study is not intended to be a cost-benefit analysis of wholesale or retail competition, nor does this report include an analysis of the macroeconomic impacts of competitive electricity prices

  9. Assessing the cost-effectiveness of electric vehicles in European countries using integrated modeling

    International Nuclear Information System (INIS)

    Seixas, J.; Simões, S.; Dias, L.; Kanudia, A.; Fortes, P.; Gargiulo, M.

    2015-01-01

    Electric vehicles (EVs) are considered alternatives to internal combustion engines due to their energy efficiency and contribution to CO 2 mitigation. The adoption of EVs depends on consumer preferences, including cost, social status and driving habits, although it is agreed that current and expected costs play a major role. We use a partial equilibrium model that minimizes total energy system costs to assess whether EVs can be a cost-effective option for the consumers of each EU27 member state up to 2050, focusing on the impact of different vehicle investment costs and CO 2 mitigation targets. We found that for an EU-wide greenhouse gas emission reduction cap of 40% and 70% by 2050 vis-à-vis 1990 emissions, battery electric vehicles (BEVs) are cost-effective in the EU only by 2030 and only if their costs are 30% lower than currently expected. At the EU level, vehicle costs and the capability to deliver both short- and long-distance mobility are the main drivers of BEV deployment. Other drivers include each state’s national mobility patterns and the cost-effectiveness of alternative mitigation options, both in the transport sector, such as plug-in hybrid electric vehicles (PHEVs) or biofuels, and in other sectors, such as renewable electricity. - Highlights: • Electric vehicles were assessed through the minimization of the total energy systems costs. • EU climate policy targets could act as a major driver for PHEV adoption. • Battery EV is an option before 2030 if costs will drop by 30% from expected costs. • EV deployment varies per country depending on each energy system configuration. • Incentives at the country level should consider specific cost-effectiveness factors

  10. Cost of electricity from small scale co-generation of electricity and heat

    Energy Technology Data Exchange (ETDEWEB)

    Kjellstroem, Bjoern

    2012-07-15

    There is an increasing interest in Sweden for using also small heat loads for cogeneration of electricity and heat. Increased use of small CHP-plants with heat supply capacities from a few 100 kW(h) up to 10 MW(h) cannot change the structure of the electricity supply system significantly, but could give an important contribution of 2 - 6 TWh(e) annually. The objective of this study was to clarify under what conditions electricity can be generated in small wood fired CHP-plants in Sweden at costs that can compete with those for plants using fossil fuels or nuclear energy. The capacity range studied was 2 - 10 MW(h). The results should facilitate decisions about the meaningfulness of considering CHP as an option when new heat supply systems for small communities or sawmills are planned. At the price for green certificates in Sweden, 250 - 300 SEK/MWh(e), generation costs in small wood fired CHP-plants should be below about 775 SEK/MWh(e) to compete with new nuclear power plants and below about 925 SEK/MWh(e) to compete with generation using fossil fuels.

  11. Comparing the Mass, Energy, and Cost Effects of Lightweighting in Conventional and Electric Passenger Vehicles

    Directory of Open Access Journals (Sweden)

    Johannes Hofer

    2014-09-01

    Full Text Available In this work the effect of weight reduction using advanced lightweight materials on the mass, energy use, and cost of conventional and battery electric passenger vehicles is compared. Analytic vehicle simulation is coupled with cost assessment to find the optimal degree of weight reduction minimizing manufacturing and total costs. The results show a strong secondary weight and cost saving potential for the battery electric vehicles, but a higher sensitivity of vehicle energy use to mass reduction for the conventional vehicle. Generally, light weighting has the potential to lower vehicle costs, however, the results are very sensitive to parameters affecting lifetime fuel costs for conventional and battery costs for electric vehicles. Based on current technology cost estimates it is shown that the optimal amount of primary mass reduction minimizing total costs is similar for conventional and electric vehicles and ranges from 22% to 39%, depending on vehicle range and overall use patterns. The difference between the optimal solutions minimizing manufacturing versus total costs is higher for conventional than battery electric vehicles.

  12. Environmental costs resulting from the use of hard coal to electricity generation in Poland

    Science.gov (United States)

    Stala-Szlugaj, Katarzyna; Grudziński, Zbigniew

    2017-10-01

    In the world's fuel mix used for generating electricity, the most common fossil fuel is coal. In the EU, coal combustion and electricity generation entail the need to purchase emission allowances (EUA) whose purchase costs affect the costs of electricity generation significantly. The research described in the article shows how current market conditions shape the profitability of generating electricity from coal and how Clean Dark Spread (CDS) changes as a function of changes in energy and coal prices at the assumed levels of emission and prices of EUA allowances. The article compares the results of CDS calculations in two variants. Areas have been highlighted where prices of both coal and EUA allowances cause CDS to assume values at which the prices of generated electricity do not cover the costs of fuel (i) and CO2 emission allowances, cover all costs (ii), or constitute positive prices (iii), but still do not cover all fixed costs. With higher power plant efficiency, CO2 emissions are lower (0.722 t/MWh). The costs of purchasing fuel required to generate 1 MWh of electricity are also lower. In such case—even with relatively high prices of coal—a power plant can achieve profitability of electricity generation.

  13. Environmental costs resulting from the use of hard coal to electricity generation in Poland

    Directory of Open Access Journals (Sweden)

    Stala-Szlugaj Katarzyna

    2017-01-01

    Full Text Available In the world's fuel mix used for generating electricity, the most common fossil fuel is coal. In the EU, coal combustion and electricity generation entail the need to purchase emission allowances (EUA whose purchase costs affect the costs of electricity generation significantly. The research described in the article shows how current market conditions shape the profitability of generating electricity from coal and how Clean Dark Spread (CDS changes as a function of changes in energy and coal prices at the assumed levels of emission and prices of EUA allowances. The article compares the results of CDS calculations in two variants. Areas have been highlighted where prices of both coal and EUA allowances cause CDS to assume values at which the prices of generated electricity do not cover the costs of fuel (i and CO2 emission allowances, cover all costs (ii, or constitute positive prices (iii, but still do not cover all fixed costs. With higher power plant efficiency, CO2 emissions are lower (0.722 t/MWh. The costs of purchasing fuel required to generate 1 MWh of electricity are also lower. In such case—even with relatively high prices of coal—a power plant can achieve profitability of electricity generation.

  14. Electricity prices in a competitive environment: Marginal cost pricing of generation services and financial status of electric utilities. A preliminary analysis through 2015

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    The emergence of competitive markets for electricity generation services is changing the way that electricity is and will be priced in the United States. This report presents the results of an analysis that focuses on two questions: (1) How are prices for competitive generation services likely to differ from regulated prices if competitive prices are based on marginal costs rather than regulated {open_quotes}cost-of-service{close_quotes} pricing? (2) What impacts will the competitive pricing of generation services (based on marginal costs) have on electricity consumption patterns, production costs, and the financial integrity patterns, production costs, and the financial integrity of electricity suppliers? This study is not intended to be a cost-benefit analysis of wholesale or retail competition, nor does this report include an analysis of the macroeconomic impacts of competitive electricity prices.

  15. Cost and quality of fuels for electric utility plants, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-14

    This document presents an annual summary of statistics at the national, Census division, State, electric utility, and plant levels regarding the quantity, quality, and cost of fossil fuels used to produce electricity. Purpose of this publication is to provide energy decision-makers with accurate, timely information that may be used in forming various perspectives on issues regarding electric power.

  16. Reducing operating costs: A collaborative approach between industry and electric utilities

    International Nuclear Information System (INIS)

    Tyers, B.; Sibbald, L.

    1993-01-01

    The unit cost of electricity to industrial consumers is expected to increase at a rate of 5% annually in the 1990s. The partnership that has been created between Amoco Canada Petroleum Company and TransAlta Utilities to control the cost of electricity is described. To allow the company to receive lower rates for interruptible power, a number of measures have been taken. The Amoco Whitecourt plant has standby generators in reserve that can be used when utility power is not available. A Pembina compressor can be turned off for up to 12 hours, at 30 minutes notice, without affecting field pressure. At the East Crossfield plant sales gas can be compressed using electricity or a gas-driven engine. Spot market energy is used in a number of plants allowing electric drive alternatives to plant operators and offering short term energy markets. TransAlta invests in electrical equipment such as switchgear as well as transmission lines and transformers. New rate alternatives offered by TransAlta Utilities include review of the need for a demand ratchet, additional time of use rates, unbundling of rates allowing power purchase from alternative sources, rates that follow product costs, reduced rates for conversion of gas to electric drives certain circumstances, energy audits, and power factor credits. 5 figs

  17. Marginal cost pricing of electricity

    International Nuclear Information System (INIS)

    Edsbaecker, G.

    1980-01-01

    The discipline is economics and the phenomenon is the power system. The purpose of this system is to produce, transmit and consume electricity in such a way that the sum of consumers and suppliers surplus in maximized. This is accomplished by the means of marginal cost pricing. The concepts of the power system and the relations prevailing between and among them are picked out, defined and analyzed in the frames of economic theory and operations research. Methods are developed aiming at efficient prices so that the short run function of the power system is managed in such a way that the sum of conumers and suppliers surplus is maximized within the framwork of this system, i.e. value of service of the power system is maximized. The task of developing such methods is accomplished subject to mixed production resources, transmission losses, periodic demand and also when there is lack of information concerning future and cost conditions. The main results are methods which take to account the conditions stated above. Methods not only allowing for traditional cost minimizing but also for maximation of value of service including a process of reaching optimum by gradual adaption when demand and cost curves are not known in advance. (author)

  18. Real Option Cost Vulnerability Analysis of Electrical Infrastructure

    Science.gov (United States)

    Prime, Thomas; Knight, Phil

    2015-04-01

    Critical infrastructure such as electricity substations are vulnerable to various geo-hazards that arise from climate change. These geo-hazards range from increased vegetation growth to increased temperatures and flood inundation. Of all the identified geo-hazards, coastal flooding has the greatest impact, but to date has had a low probability of occurring. However, in the face of climate change, coastal flooding is likely to occur more often due to extreme water levels being experienced more frequently due to sea-level rise (SLR). Knowing what impact coastal flooding will have now and in the future on critical infrastructure such as electrical substations is important for long-term management. Using a flood inundation model, present day and future flood events have been simulated, from 1 in 1 year events up to 1 in 10,000 year events. The modelling makes an integrated assessment of impact by using sea-level and surge to simulate a storm tide. The geographical area the model covers is part of the Northwest UK coastline with a range of urban and rural areas. The ensemble of flood maps generated allows the identification of critical infrastructure exposed to coastal flooding. Vulnerability has be assessed using an Estimated Annual Damage (EAD) value. Sampling SLR annual probability distributions produces a projected "pathway" for SLR up to 2100. EAD is then calculated using a relationship derived from the flood model. Repeating the sampling process allows a distribution of EAD up to 2100 to be produced. These values are discounted to present day values using an appropriate discount rate. If the cost of building and maintain defences is also removed from this a Net Present Value (NPV) of building the defences can be calculated. This distribution of NPV can be used as part of a cost modelling process involving Real Options, A real option is the right but not obligation to undertake investment decisions. In terms of investment in critical infrastructure resilience this

  19. Energy use, cost and CO2 emissions of electric cars

    NARCIS (Netherlands)

    van Vliet, O.; Brouwer, A.S.; Kuramochi, T.; van den Broek, M.A.; Faaij, A.P.C.

    2010-01-01

    We examine efficiency, costs and greenhouse gas emissions of current and future electric cars (EV), including the impact from charging EV on electricity demand and infrastructure for generation and distribution. Uncoordinated charging would increase national peak load by 7% at 30% penetration rate

  20. The Impact of Dynamic Electricity Tariff on Long-run Incremental Cost

    DEFF Research Database (Denmark)

    Ding, Yi; Li, Yang; Pineda, Salvador

    2012-01-01

    Electricity plays an important role in the future energy framework around the world. The foreseen high penetration of renewable energy resources and electric vehicles (EV) will change the way of understanding and operating power systems. Consequently, significant investment in network infrastruct......Electricity plays an important role in the future energy framework around the world. The foreseen high penetration of renewable energy resources and electric vehicles (EV) will change the way of understanding and operating power systems. Consequently, significant investment in network...... infrastructure needs to be made in order to cope with this tremendous change in an efficient and effective manner. Long-run incremental cost (LRIC) pricing method is recognized as an economically efficient approach for pricing network charges, which provides forward-looking information for future investment cost...

  1. Regional comparison of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Bowers, H.I.

    1984-01-01

    Nuclear's main disadvantages are its high capital investment cost and uncertainty in schedule compared with alternatives. Nuclear plant costs continue to rise whereas coal plant investment costs are staying relative steady. Based on average experience, nuclear capital investment costs are nearly double those of coal-fired generation plants. The capital investment cost disadvantage of nuclear is balanced by its fuel cost advantages. New base load nuclear power plants were projected to be competitive with coal-fired plants in most regions of the country. Nuclear power costs wre projected to be significantly less (10% or more) than coal-fired power costs in the South Atlantic region. Coal-fired plants were projected to have a significant economic advantage over nuclear plants in the Central and North Central regions. In the remaining seven regions, the levelized cost of power from either option was projected to be within 10%. Uncertainties in future costs of materials, services, and financing affect the relative economics of the nuclear and coal options significantly. 10 figures

  2. Electricity between monopoly and competition. Selling at the marginal cost. The rational guidance of electric energy consumption by tariffs

    International Nuclear Information System (INIS)

    Boiteux, Marcel

    2015-10-01

    Within the perspective of the introduction of competition, the first article comments the issues related to the different professions: distribution (which solutions as multiple grids would be too expensive?), interconnection and transport grids (same questions), and production. The author outlines some characteristics of electricity: it cannot be stored, is a rigid product, has a price elasticity almost null on the short term. Then he discusses different problems to be solved: transport tolls, competition for production, difference between customers (big clients, households, handicraft). In the second article, the author discusses the issue of pricing (why selling at cost price or at marginal cost price?) and discusses the definition of this marginal cost. In the third article, the author comments the common use of tariffs by electricity distribution companies as an incentive for a rational use of electric energy by consumers. He describes how prices are factors of economic choice, the implication of selling at cost price and at marginal cost price. He discusses the relationship between marginal cost price and budget balance, and the practical adaptation of tariffs

  3. Cost-related model for transit rates in electric power distribution networks

    International Nuclear Information System (INIS)

    Collstrand, F.

    1994-02-01

    The planned deregulation of the swedish electrical power market will require a new structure of the electrical energy rates. In this report different models of transit rates are studied. The report includes studies of literature and a proposal to a rate structure and is made specifically for Malmoe Energi AB. The differences between various methods of calculating the transfer cost are illustrated. Further, the build-up of the tariff structure and its base elements are discussed. The costs are divided on different categories of costumers and shows the cost for each customer. The new regulations should apply simultaneously to all networks, independent of the voltage level. The transit cost should be based on a number of basic elements: capital cost, operation and maintenance, losses, measuring and administration. Capital cost and operation and maintenance should be charged as power fees, the loss cost as an energy fee and the measuring and administration cost as a fixed fee. The customer bill should be split into two parts, one for the transit cost and one for the energy usage. 15 refs., 37 tabs., 6 figs

  4. Abatement cost of GHG emissions for wood-based electricity and ethanol at production and consumption levels.

    Directory of Open Access Journals (Sweden)

    Puneet Dwivedi

    Full Text Available Woody feedstocks will play a critical role in meeting the demand for biomass-based energy products in the US. We developed an integrated model using comparable system boundaries and common set of assumptions to ascertain unit cost and greenhouse gas (GHG intensity of electricity and ethanol derived from slash pine (Pinus elliottii at the production and consumption levels by considering existing automobile technologies. We also calculated abatement cost of greenhouse gas (GHG emissions with respect to comparable energy products derived from fossil fuels. The production cost of electricity derived using wood chips was at least cheaper by 1 ¢ MJ-1 over electricity derived from wood pellets. The production cost of ethanol without any income from cogenerated electricity was costlier by about 0.7 ¢ MJ-1 than ethanol with income from cogenerated electricity. The production cost of electricity derived from wood chips was cheaper by at least 0.7 ¢ MJ-1 than the energy equivalent cost of ethanol produced in presence of cogenerated electricity. The cost of using ethanol as a fuel in a flex-fuel vehicle was at least higher by 6 ¢ km-1 than a comparable electric vehicle. The GHG intensity of per km distance traveled in a flex-fuel vehicle was greater or lower than an electric vehicle running on electricity derived from wood chips depending on presence and absence of GHG credits related with co-generated electricity. A carbon tax of at least $7 Mg CO2e-1 and $30 Mg CO2e-1 is needed to promote wood-based electricity and ethanol production in the US, respectively. The range of abatement cost of GHG emissions is significantly dependent on the harvest age and selected baseline especially for electricity generation.

  5. Nuclear power production: The financial costs. Background paper

    International Nuclear Information System (INIS)

    Berg, P.

    1993-11-01

    For many years, the Canadian nuclear industry has priced itself on its ability to provide safe, reliable and low-cost electricity to consumers. While nuclear power has indeed proved to be a relatively safe generator of electricity, its performance with respect to reliability and cost has declined noticeably in recent years. This paper documents the deteriorating cost performance of the industry, in comparison with that of its traditional competitor in power generation. It also breaks down the total costs into its component parts, assessing the key factors underlying the trends that are worsening the competitive position of the industry: a rise in initial capital costs, unanticipated technical difficulties resulting in additional capital costs, and the increasing operating expenses associated with poorer-than-expected reactor performance. (author). 8 refs., 2 tabs., 1 fig

  6. Electricity transmission pricing. How contracts must reflect costs

    International Nuclear Information System (INIS)

    Shuttleworth, G.

    1996-01-01

    Two basic structures of transmission systems are distinguished: transmission channels offered through an integrated electric utility and open access offered over an independent network. The first structure allows the application of 'top-down pricing', where transmission prices are derived from customer tariffs less avoidable generation costs. Transmission prices in the second structure must be derived from a 'bottom-up' analysis of transmission costs, including building capacity, marginal losses, and congestion. 5 refs

  7. The impact of financing schemes and income taxes on electricity generation costs

    International Nuclear Information System (INIS)

    Bertel, E.; Plante, J.

    2007-01-01

    Electricity generation cost estimates reported in many national and international studies provide a wealth of data to support economic assessments, and eventually to guide choices on generation sources and technologies. However, although the electricity generating cost is the criterion generally selected to present results, it is calculated by various means in different studies because the chosen approach must be relevant to the context of the specific project (private vs. stated-owned investor, regional differences...). The traditional constant-money levelized generation cost methodology is widely used by utilities, government agencies and international organisations to provide economic assessments of alternative generation options. It gives transparent and robust results, especially suitable for screening studies and international comparisons. However, the method, which is strictly economic, does not take into account all the factors influencing the choice of investors in liberalized electricity markets. In particular, it does not take into account financing schemes and income taxes which may hate a significant impact on the capital cost to be supported by the investor. The approach described below is based on the overall framework of average levelized lifetime cost evaluation, but it takes into account the financing scheme adopted by the investor and the income taxes supported by the plant operator/utility. It is similar to models which are used to analyse the economics of competing electricity generation sources in liberalized electricity markets, such as the merchant plant cash flow model adopted in the MIT study. (authors)

  8. Electricity from fossil fuels without CO2 emissions: assessing the costs of carbon dioxide capture and sequestration in U.S. electricity markets.

    Science.gov (United States)

    Johnson, T L; Keith, D W

    2001-10-01

    The decoupling of fossil-fueled electricity production from atmospheric CO2 emissions via CO2 capture and sequestration (CCS) is increasingly regarded as an important means of mitigating climate change at a reasonable cost. Engineering analyses of CO2 mitigation typically compare the cost of electricity for a base generation technology to that for a similar plant with CO2 capture and then compute the carbon emissions mitigated per unit of cost. It can be hard to interpret mitigation cost estimates from this plant-level approach when a consistent base technology cannot be identified. In addition, neither engineering analyses nor general equilibrium models can capture the economics of plant dispatch. A realistic assessment of the costs of carbon sequestration as an emissions abatement strategy in the electric sector therefore requires a systems-level analysis. We discuss various frameworks for computing mitigation costs and introduce a simplified model of electric sector planning. Results from a "bottom-up" engineering-economic analysis for a representative U.S. North American Electric Reliability Council (NERC) region illustrate how the penetration of CCS technologies and the dispatch of generating units vary with the price of carbon emissions and thereby determine the relationship between mitigation cost and emissions reduction.

  9. Taxing Electricity Sector Carbon Emissions at Social Cost

    OpenAIRE

    Paul, Anthony; Beasley, Blair; Palmer, Karen

    2013-01-01

    Concerns about budget deficits, tax reform, and climate change are fueling discussions about taxing carbon emissions to generate revenue and reduce greenhouse gas emissions. Imposing a carbon tax on electricity production based on the social cost of carbon (SCC) could generate between $21 and $82 billion in revenues in 2020 and would have important effects on electricity markets. The sources of emissions reductions in the sector depend on the level of the tax. A carbon tax based on lower SCC ...

  10. Comparison of costs of electricity generation based on nuclear energy and pit coal

    International Nuclear Information System (INIS)

    1981-01-01

    Despite of a meanwhile considerable increase in costs of installation, especially of nuclear power stations, the differences in costs have increased in favour of nuclear electricity generation. The cost advantages are estimated 4 German Pfennig per kilowatt-hour in the base-load field for plants coming into operation at the end of this decade compared with the most profitable variant of pit coal utilization on which this investigation is based; compared to the use of German hard coal, assuming a relatively optimistic development of prices for domestic hard coal in the future, the cost advantage is estimated 8 German Pfennig per kilowatt-hour. The main reason is that in the past years the price for German hard coal as well as for imported coal considerably rose and for the future further increases have to be expected whereas the largest share of the costs of nuclear electricity generation doesn't increase, after the plant is completed. Considering the importance of the fuel costs within the total costs of electricity generation in coal power stations this must have its effects on the total result. These results also prove to be valid for a variation of important cost parameters. Only if the unlikely assumption that considerable variations of influences on costs - each unfavourable effecting nuclear electricity generation - would come together would prove to be true the economic efficiency of nuclear energy would be reduced or questioned. (UA) [de

  11. CSP electricity cost evolution and grid parities based on the IEA roadmaps

    International Nuclear Information System (INIS)

    Hernández-Moro, J.; Martínez-Duart, J.M.

    2012-01-01

    The main object of this paper consists in the development of a mathematical closed-form expression for the evaluation, in the period 2010–2050, of the levelized costs of energy (LCOE) of concentrating solar power (CSP) electricity. For this purpose, the LCOE is calculated using a life-cycle cost method, based on the net present value, the discounted cash flow technique and the technology learning curve approach. By this procedure, the LCOE corresponding to CSP electricity is calculated as a function of ten independent variables. Among these parameters, special attention has been put on the evaluation of the available solar resource, the analysis of the IEA predicted values for the cumulative installed capacity, the initial (2010) cost of the system, the discount and learning rates, etc. One significant contribution of our work is that the predicted evolution of the LCOEs strongly depend, not only on the particular values of the cumulative installed capacity function in the targeted years, but mainly on the specific curved time-paths which are followed by this function. The results obtained in this work are shown both graphically and numerically. Finally, the implications that the results could have in energy planning policies and grid parity calculations are discussed. - Highlights: ► A mathematical closed expression has been developed for calculating the evolution of CSP electricity costs. ► Our technique for the prediction of CSP electricity costs and grid parities is based on IEA Roadmaps. ► The time-table (2010–2050) of cumulative installed CSP capacity is key to electricity cost predictions. ► CSP grid parities can occur within next decade for sites with proper solar resources.

  12. Preventable Complications Driving Rising Costs in Management of Patients with Critical Limb Ischemia.

    Science.gov (United States)

    Dua, Anahita; Desai, Sapan S; Patel, Bhavin; Seabrook, Gary R; Brown, Kellie R; Lewis, Brian; Rossi, Peter J; Malinowski, Michael; Lee, Cheong J

    2016-05-01

    This study aimed to identify factors that drive increasing health-care costs associated with the management of critical limb ischemia in elective inpatients. Patients with a primary diagnosis code of critical limb ischemia (CLI) were identified from the 2001-2011 Nationwide Inpatient Sample. Demographics, CLI management, comorbidities, complications (bleeding, surgical site infection [SSI]), length of stay, and median in-hospital costs were reviewed. Statistical analysis was completed using Students' t-test and Mann-Kendall trend analysis. Costs are reported in 2011 US dollars corrected using the consumer price index. From 2001 to 2011, there were a total of 451,823 patients who underwent open elective revascularization as inpatients for CLI. Costs to treat CLI increased by 63% ($12,560 in 2001 to $20,517 in 2011, P cost of care. From 2001 to 2011, the number of patient comorbidities (7.56-12.40) and percentage of endovascular cases (13.4% to 27.4%) increased, accounting for a 6% annual increase in total cost despite decreased median length of stay (6 to 5 days). Patients who developed SSI had total costs 83% greater than patients without SSIs ($30,949 vs. $16,939; P costs 41% greater than nonbleeding patients ($23,779 vs. $16,821, P cost of CLI treatment is increasing and driven by rising endovascular use, SSI, and bleeding in the in-patient population. Further efforts to reduce complications in this patient population may contribute to a reduction in health care-associated costs of treating CLI. Copyright © 2016 Elsevier Inc. All rights reserved.

  13. The economic cost in the electricity sector in Japan, Post-Fukushima

    International Nuclear Information System (INIS)

    Alonso, G.; Ortega, G.; Del Valle, E.

    2014-10-01

    Of the 30 countries that use nuclear energy, Japan was the third country with greater number of nuclear reactors and installed capacity; there were 54 nuclear reactors with an installed capacity of 46,343 MW, and the participation of the nuclear energy in the electricity generation of the country was of 33% in 2010. The Fukushima accident of March 11, 2011 due to natural forces not foreseen and with a very low occurrence probability with characteristics outside the design base, provoked questioning of the safety measures of the others 51 nuclear reactors that operated in Japan. This situation causes that the mentioned 51 nuclear reactors remain without generating electric power until to ensure its safety operation before the new risk conditions. Particularly, the Japanese electric system had combined cycle plants based on gas which were used of way load pick and backup that before this new situation, they must operate as base load sources. For Japan, the nuclear energy was a base load source reliable and economic since Japan does not possess enough own resources for its electricity generation. The market of the natural gas in Japan is at present one of the most expensive worldwide so that impacts negatively in the electricity generation cost. This work analyzes the measures taken to cover the loss of nuclear electricity generation, basically by means of the use of the combined cycle plants based on natural gas, and the impact that these measures had in the costs of electricity generation of the Japanese electric system. The obtained results in this analysis show that the national electricity generation cost was increased and collaterally the quantity of greenhouse gases emissions of the country also increased. (Author)

  14. Assessing the impact of changes in the electricity price structure on dairy farm energy costs

    International Nuclear Information System (INIS)

    Upton, J.; Murphy, M.; Shalloo, L.; Groot Koerkamp, P.W.G.; De Boer, I.J.M.

    2015-01-01

    Highlights: • Choosing electricity tariffs with a low off-peak rate results in financial savings. • Cost saving potential within an electricity tariff is the greatest on large farms. • Earlier AM milking with later PM milking helps reduce electricity consumption. - Abstract: This study aims to provide information on the changes in electricity consumption and costs on dairy farms, through the simulation of various electricity tariffs that may exist in the future and how these tariffs interact with changes in farm management (i.e. shifting the milking operation to an earlier or later time of the day). A previously developed model capable of simulating electricity consumption and costs on dairy farms (MECD) was used to simulate five different electricity tariffs (Flat, Day and Night, Time of Use Tariff 1 (TOU1), TOU2 and Real Time Pricing (RTP)) on three representative Irish dairy farms: a small farm (SF), a medium farm (MF) and a large farm (LF). The Flat tariff consisted of one electricity price for all time periods, the Day and Night tariff consisted of two electricity prices, a high rate from 09:00 to 00:00 h and a low rate thereafter. The TOU tariff structure was similar to that of the Day and Night tariff except that a peak price band was introduced between 17:00 and 19:00 h. The RTP tariff varied dynamically according to the electricity demand on the national grid. The model used in these simulations was a mechanistic mathematical representation of the electricity consumption that simulated farm equipment under the following headings; milk cooling system, water heating system, milking machine system, lighting systems, water pump systems and the winter housing facilities. The effect of milking start time was simulated to determine the effect on electricity consumption and costs at farm level. The earliest AM milking start time and the latest PM milking start time resulted in the lowest energy consumption. The difference between the lowest and highest

  15. Social costs of innovative electricity generation technologies in the present and in 2030

    Energy Technology Data Exchange (ETDEWEB)

    Preiss, Philipp; Friedrich, Rainer; Blesl, Markus; Wissel, Steffen; Mayer-Spohn, Oliver; Klotz, Volker [Stuttgart Univ. (DE). Inst. fuer Energiewirtschaft und Rationelle Energieanwendung (IER)

    2008-07-01

    Social costs (costs seen from the perspective of the society) differ from private costs and thus influence the ranking of electricity generating technologies. The resulting social costs data provide a basis for the recommendation to use the potential of nuclear, wind and hydropower as far as possible, however the potential of these technologies is limited. The analysis shows, that the remaining electricity demand in the future still should be met by using lignite and coal. Depending on the stringency of the climate change aims these plants would be equipped with CCS (carbon capture and storage) or not. Only with ambitious climate change aims and if CCS turns out to be less economically or technically feasible, than the import of electricity generated by a solar through systems in Mediterranean countries would become an option. The environmental advantages of PV are too small to compensate the very high investment costs in Germany. The detailed analysis of different contributions to the social costs per kWh shows that the costs of natural gas technologies are dominated by private costs of fuel supply. If we assume 50% higher prices than in the basic assumption this increases social costs up to 30%. (orig.)

  16. Levelized cost of electricity (LCOE) of renewable energies and required subsidies in China

    International Nuclear Information System (INIS)

    Ouyang, Xiaoling; Lin, Boqiang

    2014-01-01

    The development and utilization of renewable energy (RE), a strategic choice for energy structural adjustment, is an important measure of carbon emissions reduction in China. High cost is a main restriction element for large-scale development of RE, and accurate cost estimation of renewable power generation is urgently necessary. This is the first systemic study on the levelized cost of electricity (LCOE) of RE in China. Results indicate that feed-in-tariff (FIT) of RE should be improved and dynamically adjusted based on the LCOE to provide a better support of the development of RE. The current FIT in China can only cover the LCOE of wind (onshore) and solar photovoltaic energy (PV) at a discount rate of 5%. Subsidies to renewables-based electricity generation, except biomass energy, still need to be increased at higher discount rates. Main conclusions are drawn as follows: (1) Government policy should focus on solving the financing problem of RE projects because fixed capital investment exerts considerable influence over the LCOE; and (2) the problem of high cost could be solved by providing subsidies in the short term and more importantly, by reforming electricity price in the mid-and long-term to make the RE competitive. - Highlights: • Levelized cost of electricity (LCOE) of renewable energies is systemically studied. • Renewable power generation costs are estimated based on data of 17 power plants. • Required subsidies for renewable power generation are calculated. • Electricity price reform is the long-term strategy for solving problem of high cost

  17. Understanding the cost of power interruptions to U.S. electricity consumers

    Energy Technology Data Exchange (ETDEWEB)

    LaCommare, Kristina Hamachi; Eto, Joseph H.

    2004-09-01

    The massive electric power blackout in the northeastern United States and Canada on August 14-15, 2003 resulted in the U.S. electricity system being called ''antiquated'' and catalyzed discussions about modernizing the grid. Industry sources suggested that investments of $50 to $100 billion would be needed. This report seeks to quantify an important piece of information that has been missing from these discussions: how much do power interruptions and fluctuations in power quality (power-quality events) cost U.S. electricity consumers? Accurately estimating this cost will help assess the potential benefits of investments in improving the reliability of the grid. We develop a comprehensive end-use framework for assessing the cost to U.S. electricity consumers of power interruptions and power-quality events (referred to collectively as ''reliability events''). The framework expresses these costs as a function of: (1) Number of customers by type in a region; (2) Frequency and type of reliability events experienced annually (including both power interruptions and power-quality events) by these customers; (3) Cost of reliability events; and (4) Vulnerability of customers to these events. The framework is designed so that its cost estimate can be improved as additional data become available. Using our framework, we estimate that the national cost of power interruptions is about $80 billion annually, based on the best information available in the public domain. However, there are large gaps in and significant uncertainties about the information currently available. Notably, we were not able to develop an estimate of power-quality events. Sensitivity analysis of some of these uncertainties suggests that the total annual cost could range from less than $30 billion to more than $130 billion. Because of this large range and the enormous cost of the decisions that may be based on this estimate, we encourage policy makers, regulators, and

  18. Efficiency and cost effectiveness of retrofitting ventilation in low-rise housing

    International Nuclear Information System (INIS)

    Bowser, D.; Fugler, D.

    2000-01-01

    Effective and inexpensive ventilation systems that can be retrofitted to existing low-rise housing to improve indoor air quality in existing housing stock is discussed. In a project by CMHC ten retrofit ventilation systems in single family residential buildings were tested in an effort to identify homes with specific indoor air quality concerns and to evaluate the performance of these retrofit systems by monitoring air quality before and after installation. Measurements were taken over a two-to-three day period with normal occupancy. In one case radon contamination was also measured directly before and after the retrofit. Cost estimates were based on capital, operating and maintenance expenses. This paper describes the results of three sample case studies. One of these involved a home with high concentration of radon gas. The recommended solution was fan-assisted removal of soil gases as the only way to ensure substantial reductions in concentration. Cost of the system was $2,450, plus $79 annual operating expenses. The second case involved a basement apartment with odour and moisture build-up. To solve the problem, an exhaust-only ventilation system with multiple pick-up points was installed at a cost of $750. Annual operating costs are estimated at $171. The third case study described a dwelling with windows and exhaust ducts showing condensation and mold on the bathroom ceiling. Balanced mechanical ventilation via an HRV was installed to exhaust the moist air from the house and to supply fresh dry air. In this case cost of the system was $1,345 installed, plus annual operating costs of $117. It was stressed that different houses have different requirements. Therefore it is important to be fully aware of the amount of natural ventilation a house has, prior to determining whether the solution demands additional ventilation requirements or simply redistribution. 1 ref., 3 figs

  19. Comparative costs of coal and nuclear-generated electricity in the united states

    International Nuclear Information System (INIS)

    Brandfon, W.W.

    1987-01-01

    This paper compares the future first-year operating costs and lifetime levelized costs of producing baseload coal- and nuclear-generated electricity under schedules shorter than those recently experienced at U.S. plants. Nuclear appears to have a clear economic advantage. Coal is favorable only when it is assumed that the units will operate at very low capacity factors and/or when the capital cost differential between nuclear and coal is increased far above the recent historical level. Nuclear is therefore a cost-competitive electric energy option for utilities and should be considered as an alternative to coal when large baseload capacity is required. (author)

  20. External costs of electricity production: case study Croatia

    International Nuclear Information System (INIS)

    Bozicevic Vrhovcak, Maja; Tomsic, Zeljko; Debrecin, Nenad

    2005-01-01

    Because electricity production is one of the major sources of pollution, and at the same time is the most centralised one, environmental issues in power system operation and planning are gaining ever-increasing attention. It is very difficult to compare environmental impacts of various electricity generation technologies and fuel types because they are extremely divergent. The most widely accepted common denominator today is the so-called external cost by which a monetary value is associated with environmental damage. In this paper, damages to human health resulting from Croatian thermal power plants annual operation are presented. Stack emissions have been translated into ambient concentrations by atmospheric dispersion modelling. Existing data on relations between human health degradation and ground concentrations of the analysed pollutants have been used. Geographic information software has been used in order to account for spatially dependent data. Monetary values have been assigned to the estimated human health damage. External costs resulting from impact of Croatian thermal power plants airborne emissions on human health have been calculated. The total Croatian thermal power system external costs, resulting from impacts on human health, are presented and discussed

  1. Rising electricity consumption: Driving forces and consequences. The case of rural Zanzibar

    Energy Technology Data Exchange (ETDEWEB)

    Winther, Tanja [Centre for Development and the Environment (SUM), Univ. of Oslo (Norway)

    2007-07-01

    The paper addresses the current, rising electricity consumption in the southern, rural locality of Zanzibar and seeks to account for the range of driving forces behind people's changed practices. The author argues that these forces are, on the one hand, determined by the availability of new technologies and through global and national institutions and influences such as Islam, commercials and changes in the governmental sector (health, education). On the other hand, the paper explores the way such influences interplay with the internal dynamics related to increasing consumption. Through an analysis of the particular character and dynamics of social and cultural life in this region, the author explains why some practices are less likely to change than other practices. For example, people in Zanzibar keep electricity (freezers and stoves) at a distance from their food. By contrast, electric light is perceived as intimately related to education, as illustrated when school children are sent to school for night classes before important exams. To which extent may general approaches to the study of energy consumption draw on this empirical case from Zanzibar? In other contexts, the patterns of people's electricity use certainly differ. In terms of sustainable energy policies, each locality has a particular set of challenges and goals, which to varying degree may be related to poverty reduction and concern for the environment. Methodologically, however, the author argues that the phenomenon of energy consumption may be studied and understood within the same framework of analysis; one that pays attention to both external and internal dynamics, the material and social aspects of technologies and the importance of power relations, gender and negotiations.

  2. Managing electricity procurement cost and risk by a local distribution company

    International Nuclear Information System (INIS)

    Woo, C.-K.; Karimov, R.I.; Horowitz, Ira

    2004-01-01

    A local electricity distribution company (LDC) can satisfy some of its future electricity requirements through self-generation and volatile spot markets, and the remainder through fixed-price forward contracts that will reduce its exposure to the inherent risk of spot-price volatility. A theoretical framework is developed for determining the forward-contract purchase that minimizes the LDCs expected procurement cost, subject to a cost-exposure constraint. The answers to the questions of 'What to buy?' and 'How to buy?' are illustrated using an example of a hypothetical LDC that is based on a municipal utility in Florida. It is shown that the LDCs procurement decision is consistent with least-cost procurement subject to a cost-exposure constraint, and that an internet-based multi-round auction can produce competitive price quotes for its desired forward purchase

  3. Cost-Optimal ATCs in Zonal Electricity Markets

    DEFF Research Database (Denmark)

    Jensen, Tue Vissing; Kazempour, Jalal; Pinson, Pierre

    2017-01-01

    from the physical ATCs based on security indices only typically used in zonal electricity markets today. Determining cost-optimal ATCs requires viewing ATCs as an endogenous market construct, and leads naturally to the definition of a market entity whose responsibility is to optimize ATCs....... The optimization problem which this entity solves is a stochastic bilevel problem, which we decompose to yield a computationally tractable formulation. We show that cost-optimal ATCs depend non-trivially on the underlying network structure, and the problem of finding a setof cost-optimal ATCs is in general non...... by a factor of 2 or more, and ATCs which are zero between well-connected areas.Our results indicate that the perceived efficiency gap between zonal and nodal markets may be exagerrated if non-optimal ATCs are used....

  4. The True Cost of Electric Power. An Inventory of Methodologies to Support Future Decision-making in Comparing the Cost and Competitiveness of Electricity Generation Technologies. Summary for policy-makers

    International Nuclear Information System (INIS)

    Burtraw, Dallas; Krupnick, Alan

    2012-06-01

    In energy markets across the world, market prices for fossil fuels are often lower than the prices of energy generated from renewable sources, such as solar, wind, and bio-fuels. These market prices, however, don't take into account the 'true costs' of the energy being sold, because they ignore the external costs to society caused by pollution and its resulting burdens, including damages to public health and the environment. Accounting for these externalities can as much as double the cost of some fossil fuels and, in some cases, make them more expensive than renewables. Because renewable forms of energy have far lower external costs than energy generated from fossil fuels, if one can implement policies that incorporate those costs into the price of electricity generated from all technologies, the playing field levels out and renewables can compete on a more fair and economically justified basis. The challenge, of course, is determining those 'true costs'. Estimating the true costs of electricity generation is both complex and controversial. It is complex because it must take into account several factors, including the population density near a power plant, the fuel it uses, and its pollution abatement technology. It is controversial because it requires assumptions and decisions to be made that the public does not like or does not understand. These include monetizing some types of risks (for example, to health) and ignoring others, such as occupational risks from coal mining when they are already 'internalized' by the coal company in the wages it pays. Finally, these approaches are certain to be controversial because they can affect billions of dollars in investments in electricity generation. This report, The True Cost of Electric Power, examines the various methods that have been used to measure such 'true' costs and looks at how such estimates can be used in company decision-making and public policy to ensure that

  5. How much electricity really costs. Comparison of the state subsidisation and overall social costs of conventional and renewable energy resources

    International Nuclear Information System (INIS)

    Kuechler, Swantje; Meyer, Bettina

    2012-01-01

    This study explains how the costs of electricity are an aggregate of different components. The electricity price paid by the end consumer contains not only the actual costs of energy production, which make up only about a third of the actual price in an average household, but also different surcharges such as network charges, electricity tax, value added tax and the concession levy. It furthermore contains the allocation charge stipulated by the Renewable Energy Law (EEG reallocation charge) as a means of allocating the costs of the subsidisation of electricity from renewable resources to the consumers. On the other hand conventional energy resources such as nuclear energy, hard coal and brown coal have substantially benefited over many decades from state subsidies in the form of financial aids, tax rebates and other promotive measures. The main difference between this and the subsidisation of renewable energy is that the costs of conventional energy resources are largely charged to the state budget rather than being made transparent in the electricity price. Based on an evaluation of the literature, data, interviews and the authors' own methodological deliberations this study makes a systematic comparison of the direct as well as indirect state subsidisation of renewable and conventional energy resources during the period from 1970 until 2012. The annual totals obtained for each energy resources are then set in relation to the share of that resource in overall electricity production, yielding specific subsidisation rates in terms of cents per kWh for each resource. This does not yet take into account the high consequential costs in the form of environmental damage and climate-related damage caused by fossil and nuclear fuels as well as the risks associated with the latter (collectively referred to as ''external costs''), all of which are charged to the polluters only at a small fraction of the true amount. The two cost categories of state

  6. International cost relations in electric power generation

    International Nuclear Information System (INIS)

    Schmitt, D.; Duengen, H.; Wilhelm, M.

    1986-01-01

    In spite of the fact that analyses of the cost of electric power generation as the result of international comparative evaluations are indisputably relevant, problems pending in connection with the costs of representative power plant technologies are of the methodological bind. German authors have hitherto also been failing to clear up and consider all aspects connected with the problems of data acquisition and the adequate interpretation of results. The analysis presented by the paper abstracted therefore aims at the following: 1) Systematization of the different categories of cost relevant in connection with international comparative evaluation. Classification into different categories of decision making and development of standards meeting the requirements of international comparative evaluation. 2) Calculation of relevant average financial costs of Western German, America and French fossil-fuel and nuclear power plants by means of adequate calculation models, that is the assessment of costs with regard to countries and power plant technologies which are relevant to the Federal Republic of Germany. 3) Analysis of the resulting differences and determinantal interpretation. (orig./UA) [de

  7. Projected costs of generating electricity - 2005 update

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut 'winner'. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. 24 figs., 38 tabs., 11 apps.

  8. Costs of electric power generation in different types of power plants

    International Nuclear Information System (INIS)

    Weible, H.

    1977-01-01

    In the framework of our study 'energy - environment - industry' we need among other things the costs of electric power generation. We register their structure in a sub-model. Recently there was disagreement on effective costs of electric power generation particularly when comparing fossil-fuel power plants to nuclear power plants. For this reason, expertises on the costs of electric power generation in nuclear and fossil-fuel power plants were ordered with the Energy-Economic Institute in Cologne as well as with the Battelle Institute in Frankfurt. In the framwork of our paper on the system 'energy - environment - industry' we do not want to give new data potentially required for our task, before the expertises will be finished. Therefore the results given in part III of this lecture are only meant as an example in order to show possible consequences of the cost programs set up, depending on initial data whose general recognition is to be aimed at. Furthermore, the theoretical approach to investment calculation has to win general recognition when recording calculation methods computer-compatibly. Any new formulations discussed in industrial management have not been taken into account. (orig.) [de

  9. The future cost of electrical energy storage based on experience rates

    Science.gov (United States)

    Schmidt, O.; Hawkes, A.; Gambhir, A.; Staffell, I.

    2017-08-01

    Electrical energy storage could play a pivotal role in future low-carbon electricity systems, balancing inflexible or intermittent supply with demand. Cost projections are important for understanding this role, but data are scarce and uncertain. Here, we construct experience curves to project future prices for 11 electrical energy storage technologies. We find that, regardless of technology, capital costs are on a trajectory towards US$340 ± 60 kWh-1 for installed stationary systems and US$175 ± 25 kWh-1 for battery packs once 1 TWh of capacity is installed for each technology. Bottom-up assessment of material and production costs indicates this price range is not infeasible. Cumulative investments of US$175-510 billion would be needed for any technology to reach 1 TWh deployment, which could be achieved by 2027-2040 based on market growth projections. Finally, we explore how the derived rates of future cost reduction influence when storage becomes economically competitive in transport and residential applications. Thus, our experience-curve data set removes a barrier for further study by industry, policymakers and academics.

  10. External costs of electricity; Les couts externes de l'electricite

    Energy Technology Data Exchange (ETDEWEB)

    Rabl, A. [Ecole des Mines de Paris, 75 (France); Spadaro, J.V. [International Atomic Energy Agency (IAEA), Vienna (Austria)

    2005-07-01

    This article presents a synthesis of the ExternE project (External costs of Energy) of the European community about the external costs of power generation. Pollution impacts are calculated using an 'impact pathways' analysis, i.e. an analysis of the emission - dispersion - dose-response function - cost evaluation chain. Results are presented for different fuel cycles (with several technological variants) with their confidence intervals. The environmental impact costs are particularly high for coal: for instance, in France, for coal-fired power plants it is of the same order as the electricity retail price. For natural gas, this cost is about a third of the one for coal. On the contrary, the environmental impact costs for nuclear and renewable energies are low, typically of few per cent of the electricity price. The main part of these costs corresponds to the sanitary impacts, in particular the untimely mortality. In order to avoid any controversy about the cost evaluation of mortality, the reduction of the expectation of life due to the different fuel cycles is also indicated and the risks linked with nuclear energy are presented using several comparisons. (J.S.)

  11. Strategies for compensating for higher costs of geothermal electricity with environmental benefits

    International Nuclear Information System (INIS)

    Murphy, H.; Niitsuma, Hiroaki

    1999-01-01

    After very high growth in the 1980s, geothermal electricity production has slowed in the mid- and late-1990s. While Japanese, Indonesian and Philippine geothermal growth has remained high as a consequence of supportive government policies, geothermal electricity production has been flat or reduced in much of Europe and North America. Low prices for coal and natural gas, combined with deregulation, means that in much of the world electricity from new fuel-burning electricity plants can be provided at half the cost of new geothermal electricity. Cost-cutting must be pursued, but is unlikely to close the price gap by itself. Geothermal production is widely perceived as being environmentally clean, but this is not unambiguously true, and requires reinjection to be fully realized. Strategies for monetizing the environmental advantages of geothermal, including the carbon tax, are discussed. (author)

  12. Economic Evaluation of Decommissioning Cost of Nuclear Power Plant in the National Electricity Plan in Korea

    International Nuclear Information System (INIS)

    Lee, Man Ki; Nam, Ji Hee

    2008-01-01

    Decommissioning cost of a nuclear power plant includes the costs related with dismantling a nuclear power plant, disposal of a spent fuel and of a low/medium radioactive waste. The decommissioning cost is different from the other expenditures in that it is occurred after the reactor finishes its commercial operation. In this respect, the electricity act was enforced to secure provisions for decommissioning a nuclear power plant during its commercial operation. The purpose of this study is to provide economic evaluation and economic cost for a decommissioning when the cost of a decommissioning is provided as one of input to the national electricity plan. Therefore, this study does not deal with whether the estimated amount of a decommissioning cost is just or not. This study focuses how to transfer the estimated decommissioning cost given in the electricity act to the economic cost, which can be used in the national electricity plan

  13. Economic justification of costs at inspection of industrial safety of high-rise marine structures

    Science.gov (United States)

    Garibin, Pavel; Ol'khovik, Evgeniy; Rastorguev, Igor

    2018-03-01

    The task of technical and economic regulation within mutual international recognition of testing laboratories are considered. Codes and procedures within requirements of international ISO/IEC standards of a series 17000 for elimination of non-tariff barriers and interlaboratory exchange of experts in the field of high-rise marine construction are considered. In paper, the methods of assessment of formation of economically justified cost of works at inspection and monitoring of technical condition of high-rise marine wharf engineering port structure based on settlement and actual labor input were applied. For the countries of EU, data on the average cost of works of testing laboratory within a week have been taken as a basis. Such approach will be objective as considers only expenses on obligatory actions in the course of inspection of technical condition of port engineering constructions. The analysis of public results of financial activities of the accredited organizations allowed to calculate the main indicators of the size of necessary profit and overheads at observance of all requirements imposed to test laboratories including taking into account their future technical development. The offered practice corresponds to the general direction by mutual international recognition of independent testing laboratories and can be use in the future.

  14. Cost analysis of energy storage systems for electric utility applications

    Energy Technology Data Exchange (ETDEWEB)

    Akhil, A. [Sandia National Lab., Albuquerque, NM (United States); Swaminathan, S.; Sen, R.K. [R.K. Sen & Associates, Inc., Bethesda, MD (United States)

    1997-02-01

    Under the sponsorship of the Department of Energy, Office of Utility Technologies, the Energy Storage System Analysis and Development Department at Sandia National Laboratories (SNL) conducted a cost analysis of energy storage systems for electric utility applications. The scope of the study included the analysis of costs for existing and planned battery, SMES, and flywheel energy storage systems. The analysis also identified the potential for cost reduction of key components.

  15. Stranded cost recovery in electricity market reforms in the US

    International Nuclear Information System (INIS)

    Woo, C.K.; Lloyd, D.; Karimov, R.; Tishler, A.

    2003-01-01

    An important element of an electricity market reform is stranded cost recovery. This paper explains the cause of stranded costs, describes four recovery mechanisms, evaluates these mechanisms using the criteria of recovery certainty, economic efficiency and equity, reviews the financial performance of 12 utilities in the US in connection to stranded cost recovery, and shows why the mechanism used in California has contributed to the reform failure in that state. (Author)

  16. Projected Costs of Generating Electricity - 2015 Edition. Executive Summary

    International Nuclear Information System (INIS)

    2015-01-01

    This joint report by the International Energy Agency (IEA) and the Nuclear Energy Agency (NEA) is the eighth in a series of studies on electricity generating costs. As policy makers work to ensure that the power supply is reliable, secure and affordable, while making it increasingly clean and sustainable in the context of the debate on climate change, it is becoming more crucial that they understand what determines the relative cost of electricity generation using fossil fuel, nuclear or renewable sources of energy. A wide range of fuels and technologies are presented in the report, including natural gas, coal, nuclear, hydro, solar, onshore and offshore wind, biomass and biogas, geothermal, and combined heat and power, drawing on a database from surveys of investment and operating costs that include a larger number of countries than previous editions. The analysis of more than 180 plants, based on data covering 22 countries, reveals several key trends, pointing, for example, to a significant decline in recent years in the cost of renewable generation. The report also reveals that nuclear energy costs remain in line with the cost of other base-load technologies, particularly in markets that value de-carbonisation. Overall, cost drivers of the different generating technologies remain both market-specific and technology-specific. Readers will find a wealth of details and analysis, supported by over 200 figures and tables, underlining this report's value as a tool for decision makers and researchers concerned with energy policies, climate change and the evolution of power sectors around the world. (authors)

  17. Internalizing environmental costs: A survey of progress in estimating the external environmental costs of electricity production and a review of market-based policies to incorporate them

    International Nuclear Information System (INIS)

    Eto, J.H.; Helcke, G.

    1991-01-01

    The production of electricity creates environmental insults whose costs are not fully reflected in the prices paid by consumers for electricity services. Failure to incorporate these external costs leads to economically inefficient production and consumption decisions. The present work reviews two related efforts to address this market distortion. The first concerns progress in estimating the uninternalized environmental costs of electricity production. The second concerns market-based approaches to internalizing these costs in electricity production and consumption decisions. 10 tabs.; 41 refs

  18. Predicting electricity consumption and cost for South African mines / S.S. (Stephen) Cox.

    OpenAIRE

    Cox, Samuel Stephen

    2013-01-01

    Electricity costs in South Africa have risen steeply; there are a number of factors that have contributed to this increase. The increased costs have a considerable inuence on the mines and mining sector in general. It requires considerable planning to assist mines in such management. The present study addresses the development of a way to predict both electricity consumption and costs, which general involves a large range of personnel. The majority of planning personnel can be more usefull...

  19. The low cost of quality improvements in the electricity distribution sector of Brazil

    International Nuclear Information System (INIS)

    Corton, Maria Luisa; Zimmermann, Aneliese; Phillips, Michelle Andrea

    2016-01-01

    We analyze the impact of introducing output-based incentives in the price-cap regulatory regime of the Brazilian electricity distribution sector. We focus on the trade-off between operating costs and quality improvement, hypothesizing a positive relationship. Operating costs include maintenance and repair expenses. The regulator sets limits for service continuity and non-technical energy losses in each regulatory period. Service continuity refers to the average length of interruptions in electricity distribution. Non-technical losses refer to losses due to factors specific to the distribution segment. Quality incentives include peer-pressure and penalties/rewards for compliance with minimum quality standards. We model operating costs using a GMM framework to acknowledge endogeneity of variables. The model is dynamic given the inclusion of regulatory lags to recognize past cost behavior. Findings reveal a small trade-off between costs and quality. We conclude that quality improvements are not costly relative to the potential savings from complying with quality standards. We also find that the impact on operating costs is larger when energy losses increase compared to the cost effect due to increases in duration of outages. These findings suggest areas of attention in managerial decision making, and serve as valuable information to the regulator in tailoring quality incentives for this sector. - Highlights: • The article focuses on the impact of quality improvements on operating costs. • We find a very small tradeoff between quality improvements and operating costs. • We find the impact of a large share of electricity losses on costs larger compared to the impact of longer outages. • The results serve the regulator to adjust incentives for quality improvement. • The results serve the regulator in tailoring regulatory values for electricity losses and outages.

  20. Managing electricity procurement cost and risk by a local distribution company

    International Nuclear Information System (INIS)

    Chikeung Woo; Karimov, R.I.; Horowitz, I.

    2004-01-01

    A local electricity distribution company (LDC) can satisfy some of its future electricity requirements through self-generation and volatile spot markets, and the remainder through fixed-price forward contracts that will reduce its exposure to the inherent risk of spot-price volatility. A theoretical framework is developed for determining the forward-contract purchase that minimizes the LDCs expected procurement cost, subject to a cost-exposure constraint. The answers to the questions of ''What to buy?'' and ''How to buy?'' are illustrated using an example of a hypothetical LDC that is based on a municipal utility in Florida. It is shown that the LDCs procurement decision is consistent with least-cost procurement subject to a cost-exposure constraint, and that an internet-based multi-round auction can produce competitive price quotes for its desired forward purchase. (author)

  1. An Optimal Operating Strategy for Battery Life Cycle Costs in Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Yinghua Han

    2014-01-01

    Full Text Available Impact on petroleum based vehicles on the environment, cost, and availability of fuel has led to an increased interest in electric vehicle as a means of transportation. Battery is a major component in an electric vehicle. Economic viability of these vehicles depends on the availability of cost-effective batteries. This paper presents a generalized formulation for determining the optimal operating strategy and cost optimization for battery. Assume that the deterioration of the battery is stochastic. Under the assumptions, the proposed operating strategy for battery is formulated as a nonlinear optimization problem considering reliability and failure number. And an explicit expression of the average cost rate is derived for battery lifetime. Results show that the proposed operating strategy enhances the availability and reliability at a low cost.

  2. Powering Africa - Projected costs and emissions

    Science.gov (United States)

    Pappis, Ioannis; Taliotis, Constantinos; Howells, Mark; Lindblad, Nicolina

    2017-04-01

    Energy is a fundamental driver of economic growth. Several Sub-Saharan African countries are amongst the least developing economies in the world. A large proportion of the population in the region also lacks access to electricity and other modern energy services, while the individuals who have access are faced with frequent outages. This paper presents scenarios in which universal electricity access across the African continent is achieved by 2030 at a range of electricity consumption levels. A cost-optimization model is used to identify the least-cost generation mix in each country individually so as to meet the projected demand. Several generation options are allowed in each nation, while cross-border electricity trade is enabled at existing and future planned levels, so as to allow exploitation of untapped energy resources in remote regions of the continent. The results indicate that with a higher electricity consumption, CO2 emissions in generation increase considerably. This is due to coal rising as one of the dominant fuels in the supply of centralized electricity, and is of particular importance in climate change negotiations.

  3. The costs of the different pathways of electricity production and saving

    International Nuclear Information System (INIS)

    Dessus, B.

    2012-01-01

    The author discusses the content and methodology of a report published by the French Court of Audit on the assessment of the costs of the nuclear sector. He briefly recalls the principle adopted by the Court, i.e. the method of the economic current cost which calculates a global MWh cost on the whole operation duration of the selected production tool. The author discusses the application of this method to different electricity production and consumption sectors: ground-based wind energy, the Flamanville EPR, use of low-energy bulbs, air-air heat pumps, a refrigerator. He compares and discusses the results obtained for different electricity production sectors (EPR, ground-based wind energy, and gas combined cycle technology) and their sensitivity to adopted hypotheses. He comments the evolution of the investment cost of nuclear reactors in France, the economic current costs of offshore wind energy and small photovoltaic production. He finally discusses the economic current costs of the different ways of energy saving and their sensitivity to the adopted hypotheses

  4. Electric urban delivery trucks: energy use, greenhouse gas emissions, and cost-effectiveness.

    Science.gov (United States)

    Lee, Dong-Yeon; Thomas, Valerie M; Brown, Marilyn A

    2013-07-16

    We compare electric and diesel urban delivery trucks in terms of life-cycle energy consumption, greenhouse gas (GHG) emissions, and total cost of ownership (TCO). The relative benefits of electric trucks depend heavily on vehicle efficiency associated with drive cycle, diesel fuel price, travel demand, electric drive battery replacement and price, electricity generation and transmission efficiency, electric truck recharging infrastructure, and purchase price. For a drive cycle with frequent stops and low average speed such as the New York City Cycle (NYCC), electric trucks emit 42-61% less GHGs and consume 32-54% less energy than diesel trucks, depending upon vehicle efficiency cases. Over an array of possible conditions, the median TCO of electric trucks is 22% less than that of diesel trucks on the NYCC. For a drive cycle with less frequent stops and high average speed such as the City-Suburban Heavy Vehicle Cycle (CSHVC), electric trucks emit 19-43% less GHGs and consume 5-34% less energy, but cost 1% more than diesel counterparts. Considering current and projected U.S. regional electricity generation mixes, for the baseline case, the energy use and GHG emissions ratios of electric to diesel trucks range from 48 to 82% and 25 to 89%, respectively.

  5. Comparison of approximate electrical energy generating costs in OECD countries

    International Nuclear Information System (INIS)

    Stevens, G.H.; Bertel, E.

    1996-01-01

    Costs of power generating in nuclear power plants have been predicted taking into account all factors connected with investment, maintenance, exploitation and decommissioning, basing on last OECD report. The costs have been compared with alternative solutions. In majority of OECD countries the direct costs of electricity generation are very close for nuclear fossil-fuel and gas power plants. All indirect costs such as environmental impact, public health hazard, waste management, accident risk and also public acceptance for nuclear power have been discussed. 13 refs, 5 tabs

  6. Influence of plug-in hybrid electric vehicle charging strategies on charging and battery degradation costs

    International Nuclear Information System (INIS)

    Lunz, Benedikt; Yan, Zexiong; Gerschler, Jochen Bernhard; Sauer, Dirk Uwe

    2012-01-01

    The profitability of plug-in hybrid electric vehicles (PHEVs) is significantly influenced by battery aging and electricity costs. Therefore a simulation model for PHEVs in the distribution grid is presented which allows to compare the influence of different charging strategies on these costs. The simulation is based on real-world driving behavior and European Energy Exchange (EEX) intraday prices for obtaining representative results. The analysis of comprehensive lithium-ion battery aging tests performed within this study shows that especially high battery states of charge (SOCs) decrease battery lifetime, whereas the cycling of batteries at medium SOCs only has a minor contribution to aging. Charging strategies that take into account the previously mentioned effects are introduced, and the SOC distributions and cycle loads of the vehicle battery are investigated. It can be shown that appropriate charging strategies significantly increase battery lifetime and reduce charging costs at the same time. Possible savings due to lifetime extension of the vehicle battery are approximately two times higher than revenues due to energy trading. The findings of this work indicate that car manufacturers and energy/mobility providers have to make efforts for developing intelligent charging strategies to reduce mobility costs and thus foster the introduction of electric mobility. - Highlights: ► Modeling of PHEVs based on real-world driving behavior and electricity prices. ► Consideration of battery degradation for the calculation of mobility costs. ► Smart charging decreases battery degradation and electricity costs simultaneously. ► Reduction of battery degradation costs is around two times higher than reduction of electricity costs.

  7. International perspectives on the importance of electric tariff transitioning to cost-based levels in Bulgaria

    International Nuclear Information System (INIS)

    Simpson, T.; Davis, F.; Dilovska, I.

    1996-01-01

    The traditional cost-of-service approach to power pricing has been replaced in many countries by market pricing mechanisms that compensate power producers at the marginal cost of production established collectively in the marketplace. The paper stresses the importance of cost-based tariff setting pointing out two main pricing principles of utility services: 1) Revenues must meet or exceed the utility average cost of production; 2) Marginal cost pricing for incremental consumption must ensure efficient allocation of resources. Examples describing the factors encouraging transition to economically efficient tariffs at a small utility are given for: Northwest U.S., MINENERGO in Belarus, Pacific Gas and Electric Co in California and the National Electric Co (NEK) in Bulgaria.The analysis of the Bulgarian electric sector is based on ongoing work being funded by the U.S. Agency for International Development. Each of the four utilities described faces a different challenge for transitioning tariffs to cost- based levels. However, one and the same broad conclusion applies in all cases: utility pricing must take into account the underlying average and marginal cost structures of the regional power industry. Bulgaria needs transition to cost-based tariffs to recover the electricity cost-of-service and to ensure that the electric sector operates efficiently and consumers are treated fairly. Measures that facilitate the process of tariff transitioning include: 1) Developing a transparent process of tariff setting with clear objectives, a plan and timetable, and roles of organizations; 2) Establishing of independent regulation to ensure that tariff setting objectives are achieved; 3) Instituting mechanisms to reward organizations for performance that achieves electric sector objectives. 3 figs

  8. Transition-cost issues for a restructuring US electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    Utilities regulators can use a variety of approaches to calculate transition costs. We categorized these approaches along three dimensions. The first dimension is the use of administrative vs. market procedures to value the assets in question. Administrative approaches use analytical techniques to estimate transition costs. Market valuation relies on the purchase price of particular assets to determine their market values. The second dimension concerns when the valuation is done, either before or after the restructuring of the electricity industry. The third dimension concerns the level of detail involved in the valuation, what is often called top-down vs. bottom-up valuation. This paper discusses estimation approaches, criteria to assess estimation methods, specific approaches to estimating transition costs, factors that affect transition-cost estimates, strategies to address transition costs, who should pay transition costs, and the integration of cost recovery with competitive markets.

  9. Electricity cost effects of expanding wind power and integrating energy sectors

    DEFF Research Database (Denmark)

    Rodriguez, Victor Adrian Maxwell; Sperling, Karl; Hvelplund, Frede Kloster

    2015-01-01

    Recently, questions have arisen in Denmark as to how and why public funding should be allocated to wind power producers. This is, among other reasons, due to pressure from industrial electricity consumers who want their overall energy costs lowered. Utilising existing wind power subsidies across...... conditions which could allow wind power producers to reduce their reliance on subsidies. It is found that the strategy may be effective in lowering the overall energy costs of electricity consumers. Further, it is found possible to scale up this strategy and realise benefits on a national scale....

  10. Least-cost electrical services as an alternative to the braidwood project

    International Nuclear Information System (INIS)

    Lovins, A.

    1985-01-01

    This book is a summary of testimony before the Illinois Commerce Commission. The author argues that even if it cost nothing to build the Braidwood plant, it would cost less to write it off and buy electricity-saving measures instead

  11. Transition costs in the electricity industry: A summary of issues

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, L.; Hirst, E.; Hadley, S.

    1996-10-01

    Progress is evident as the restructuring debate in the U.S. electricity industry completes its third year. The Federal Energy Regulatory Commission released a final rule on transmission open access-a key element to facilitate more efficient wholesale markets. The majority of states have initiated investigations or discussions on restructuring retail markets. Yet hurdles remain in formulating and implementing state-level restructuring proposals. Perhaps foremost among these hurdles is the issue of transition costs (the potential monetary losses experienced by utilities, consumers, and other economic actors as a result of government initiatives to transform electricity generation from a regulated to a competitive market). Transition costs are approximately equal to the difference between the embedded cost for generation services under traditional cost-of-service regulation and the competitive-market price for power. When government takes action to open current monopoly franchises to multiple generation providers and the competitive-market price falls below embedded generation costs, then transition costs will arise. Transition costs will include one or more of the following four classes of costs: (1) assets, primarily utility-owned power plants; (2) liabilities, primarily long-term power-purchase and fuel-supply contracts; (3) regulatory assets, including deferred expenses and costs that regulators allow utilities to place on their balance sheets; and (4) public-policy programs, such as energy efficiency, low-income programs, and research and development. What is at issue in the transition-cost debate? The debate turns on four questions: (1) How large are the potential transition costs from restructuring? (2) How are these costs estimated? (3) What, if anything, might be done to address these costs? (4) Who will ultimately pay for any remaining costs and how? This paper summarizes some of the key results from a project at ORNL that addresses these four questions.

  12. International comparison of electricity generating costs

    International Nuclear Information System (INIS)

    Jones, P.M.S.; Stevens, G.H.; Wigley, K.

    1989-01-01

    The paper reviews the principal findings of successive studies of projected comparative generation costs for base-load electricity production conducted by Nuclear Energy Agency working groups, including a current study jointly sponsored by the International Energy Agency. It concludes that over the six years 1983-1989 nuclear generation costs have remained steady or slightly declined in the majority of OECD countries. This represents an excellent result in view of the difficulties that have arisen in many countries during the period. Nuclear power is projected to maintain a significant advantage in most OECD countries on an assessment basis reflecting utility experience and discount rates employed by the majority of participants. However, nuclear's projected advantage has declined due to a significant fall in projected coal prices which have decreased by 50% since 1983. This decline is only slightly offset by increased capital and operating costs for coal-fired plant. If rates of return sought by utilities were higher or if coal prices prove lower than utilities project then the economic balance between nuclear and coal-fired power would be further reduced and could in some instances be reversed. To improve on its competitiveness nuclear power will have to continue to control capital costs through replication and reduced construction schedules and to improve plant availability to maximise output

  13. Costs and competitiveness of nuclear electricity

    International Nuclear Information System (INIS)

    Bennett, L.L.; Woite, G.

    1995-01-01

    The experienced and projected future construction costs and electricity generation costs of nuclear and fossil fired power plants are reviewed and compared. On the basis of actual operating experience, nuclear power has been demonstrated to be economically competitive with other base load generation options, and international studies project that this economic competitiveness will be largely maintained in the future, over a range of conditions and in a number of countries. However, retaining and improving this competitiveness position requires concerted efforts to ensure that nuclear plants are constructed within schedule and budget, and are operated reliably and efficiently. Relevant cost impacting factors are identified, and conclusions for successful nuclear power plant construction and operation are drawn. The desire to attain sustainable development with balanced resource use and control of the environmental and climatic impacts of energy systems could lead to renewed interest in nuclear power as an energy source that does not emit greenhouse gases, thus contributing to a revival of the nuclear option. In this regard also, mitigation of emissions from fossil fuelled power plants could lead to restrictions of fossil fuel use and/or result in higher costs of fossil based generation, thus improving the economic competitiveness of nuclear power. (author). 19 refs, 7 figs, 2 tabs

  14. Effect of rise-time patterns on dynamics of sheath expansion during plasma immersion ion implantation

    International Nuclear Information System (INIS)

    Huang Yongxian; Tian Xiubo; Yang Shiqin; Fu Ricky; Paul, C.K.

    2007-01-01

    Plasma immersion ion implantation (PIII) has been developed as a low-cost and efficient surface modification technique of irregularly-shaped objects. The effect of six pulse waves with different rise-time patterns on the spatio-temporal evolution of plasma sheath,energy and dose of ion implantation has been simulated by particle-in-cell modeling. Statistical results may be obtained through assuming the Boltzmann distribution of electrons, and solving Poisson and Newton equations for tracing each ion in the plasma sheath. The results show that rise-time pattern has a critical influence on the evolution of plasma sheath. There exists maximum thickness difference of plasma sheath for different waveforms. The acceleration of ions is non-uniform due to the non-uniformity of electrical field strength. The maximum gradient of electrical field appears near the edge of plasma sheath. The results also show that optimization of dose and energy of incident ions may be achieved through modification of rise-time pattern. The numerical simulation of sheath expansion can be effectively used to provide a scientific basis for optimizing the PIII process. (authors)

  15. Demand for electrical energy

    International Nuclear Information System (INIS)

    Bergougnoux, J.; Fouquet, D.

    1983-01-01

    The different utilizations of electric energy are reviewed in the residential and tertiary sectors, in the industry. The competitive position of electricity in regard to other fuels has been strengthned by the sudden rise in the price of oil in 1973-1974 and 1979-1980. The evolution of electricity prices depended on the steps taken to adjust the electricity generation system. The substitution of electricity applications for hydro-carbons is an essential point of energy policy. The adjustment at all times, at least cost and most reliability, of the supply of electricity to the demand for it is a major problem in the design and operation of electric systems. National demand for power at a given moment is extremely diversified. Electricity consumption presents daily and seasonal variations, and variations according to the different sectors. Forecasting power requirements is for any decision on operation or investment relating to an electrical system. Load management is desirable (prices according to the customers, optional tariffs for ''peak-day withdrawal''). To conclude, prospects for increased electricity consumption are discussed [fr

  16. Do Canadian electricity prices reflect costs?

    International Nuclear Information System (INIS)

    Jaccard, M.

    1993-01-01

    In an article by Cairns and Heyes (1993), it is argued that electricity pricing in Canada diverges from cost due to inter-class rate design that results in cross-subsidies, subsidized cost of capital, intra-class rate design that lacks time-of-use pricing, and failure to collect differential rent. Some problems with the key components of the initial assumption that prices diverge from cost are examined. The premise that inter-class rate design results in cross-subsidies may be correct, but is difficult to test since unregulated crown utilities are not required to make the necessary information public. Cairns and Heyes are on firmer ground in their assertion that provincial government backing of utility debts leads to lower costs of capital than would otherwise occur. Quebec and British Columbia governments have recently undertaken revenue collection initiatives justified under the rationale of addressing this situation. However, there are problems with the assumption that lack of time-of-use pricing indicates cost/price divergence, since such pricing is especially relevant in capacity-critical systems. Most hydroelectric systems are energy-critical and time-of-use differentials are not appropriate. Finally, recent evidence suggests reassessing the differential rent assumptions of the 1980s. The economic rents estimated in that period may be more accurately described as windfall rents existing in the short term while markets adjust to erratic fuel prices and cost changes in nuclear and hydro energy. There may be good economic efficiency arguments against short-term rent collection strategies involving erratic price adjustments. 1 ref

  17. Internalization of external cost for the production and distribution of electricity in Flanders, Belgium

    International Nuclear Information System (INIS)

    Torfs, R.; De Nocker, L.; Schrooten, L.; Aernouts, K.; Liekens, I.

    2005-04-01

    This report elaborates the external costs of electricity production and distribution in Flanders, Belgium, and tests them against prices and taxes for electricity use. The authors examined whether these external costs decrease in time and whether such a decrease leads to internalization in the price for the users through taxes, levies or other economic instruments. The external costs mainly include external environmental costs caused by air pollution and greenhouse gases, but also damage caused by accidents, hindrance and radioactive substances that may be released. [nl

  18. Potential minimum cost of electricity of superconducting coil tokamak power reactors

    International Nuclear Information System (INIS)

    Reid, R.L.; Peng, Y-K. M.

    1989-01-01

    The potential minimum cost of electricity (COE) for superconducting tokamak power reactors is estimated by increasing the physics (confinement, beta limit, bootstrap current fraction) and technology [neutral beam energy, toroidal field (TF) coil allowable stresses, divertor heat flux, superconducting coil critical field, critical temperature, and quench temperature rise] constraints far beyond those assumed for ITER until the point of diminishing returns is reached. A version of the TETRA systems code, calibrated with the ITER design and modified for power reactors, is used for this analysis, limiting this study to reactors with the same basic device configuration and costing algorithms as ITER. A minimum COE is reduced from >200 to about 80 mill/kWh when the allowable design constraints are raised to 2 times those of ITER. At 4 times the ITER allowables, a minimum COE of about 60 mill/kWh is obtained. The corresponding tokamak has a major radius of approximately 4 m, a plasma current close to 10 MA, an aspect ratio of 4, a confinement H- factor ≤3, a beta limit of approximately 2 times the first stability regime, a divertor heat flux of about 20 MW/m 2 , a Β max ≤ 18 T, and a TF coil average current density about 3 times that of ITER. The design constraints that bound the minimum COE are the allowable stresses in the TF coil, the neutral beam energy, and the 99% bootstrap current (essentially free current drive). 14 refs., 4 figs., 2 tabs

  19. Emissions and Cost Implications of Controlled Electric Vehicle Charging in the U.S. PJM Interconnection.

    Science.gov (United States)

    Weis, Allison; Michalek, Jeremy J; Jaramillo, Paulina; Lueken, Roger

    2015-05-05

    We develop a unit commitment and economic dispatch model to estimate the operation costs and the air emissions externality costs attributable to new electric vehicle electricity demand under controlled vs uncontrolled charging schemes. We focus our analysis on the PJM Interconnection and use scenarios that characterize (1) the most recent power plant fleet for which sufficient data are available, (2) a hypothetical 2018 power plant fleet that reflects upcoming plant retirements, and (3) the 2018 fleet with increased wind capacity. We find that controlled electric vehicle charging can reduce associated generation costs by 23%-34% in part by shifting loads to lower-cost, higher-emitting coal plants. This shift results in increased externality costs of health and environmental damages from increased air pollution. On balance, we find that controlled charging of electric vehicles produces negative net social benefits in the recent PJM grid but could have positive net social benefits in a future grid with sufficient coal retirements and wind penetration.

  20. Research on the Value Evaluation of Used Pure Electric Car Based on the Replacement Cost Method

    Science.gov (United States)

    Tan, zhengping; Cai, yun; Wang, yidong; Mao, pan

    2018-03-01

    In this paper, the value evaluation of the used pure electric car is carried out by the replacement cost method, which fills the blank of the value evaluation of the electric vehicle. The basic principle of using the replacement cost method, combined with the actual cost of pure electric cars, puts forward the calculation method of second-hand electric car into a new rate based on the use of AHP method to construct the weight matrix comprehensive adjustment coefficient of related factors, the improved method of value evaluation system for second-hand car

  1. Electricity : Italian style

    International Nuclear Information System (INIS)

    Murray, L.

    2007-01-01

    Italy's electricity system was described. Italy relies on outside sources for between 10 and 15 per cent of its electricity supply. Most Italians use gas, wood stoves and fossil fuels, and are conservative about lighting. Electricity costs more in Italy than in any other European country. Italy made the decision to decommission its nuclear power stations after Chernobyl. In 2005, Italy's largest utility group signed a memorandum of understanding ensuring that they would contract energy from France's nuclear reactors. Italy is now financing and managing projects in Russia and eastern Europe, and has strengthened its ties in Spain and the Netherlands. Although Italy is intent on producing its own power, the perceptions of health hazards from electricity towers cause citizens to strongly protest new installations. It was concluded that rising energy prices may force Italians to reconsider the use of alternative energy sources. 3 figs

  2. Global cost analysis on adaptation to sea level rise based on RCP/SSP scenarios

    Science.gov (United States)

    Kumano, N.; Tamura, M.; Yotsukuri, M.; Kuwahara, Y.; Yokoki, H.

    2017-12-01

    Low-lying areas are the most vulnerable to sea level rise (SLR) due to climate change in the future. In order to adapt to SLR, it is necessary to decide whether to retreat from vulnerable areas or to install dykes to protect them from inundation. Therefore, cost- analysis of adaptation using coastal dykes is one of the most essential issues in the context of climate change and its countermeasures. However, few studies have globally evaluated the future costs of adaptation in coastal areas. This study tries to globally analyze the cost of adaptation in coastal areas. First, global distributions of projected inundation impacts induced by SLR including astronomical high tide were assessed. Economic damage was estimated on the basis of the econometric relationship between past hydrological disasters, affected population, and per capita GDP using CRED's EM-DAT database. Second, the cost of adaptation was also determined using the cost database and future scenarios. The authors have built a cost database for installed coastal dykes worldwide and applied it to estimating the future cost of adaptation. The unit costs of dyke construction will increase with socio-economic scenario (SSP) such as per capita GDP. Length of vulnerable coastline is calculated by identifying inundation areas using ETOPO1. Future cost was obtained by multiplying the length of vulnerable coastline and the unit cost of dyke construction. Third, the effectiveness of dyke construction was estimated by comparing cases with and without adaptation.As a result, it was found that incremental adaptation cost is lower than economic damage in the cases of SSP1 and SSP3 under RCP scenario, while the cost of adaptation depends on the durability of the coastal dykes.

  3. Determination of leveled costs of electric generation for gas plants, coal and nuclear

    International Nuclear Information System (INIS)

    Alonso V, G.; Palacios H, J.C.; Ramirez S, J.R.; Gomez, A.

    2005-01-01

    The present work analyzes the leveled costs of electric generation for different types of nuclear reactors known as Generation III, these costs are compared with the leveled costs of electric generation of plants with the help of natural gas and coal. In the study several discount rates were used to determine their impact in the initial investment. The obtained results are comparable with similar studies and they show that it has more than enough the base of the leveled cost the nuclear option it is quite competitive in Mexico. Also in this study it is also thinks about the economic viability of a new nuclear power station in Mexico. (Author)

  4. Desalting sea water and brackish waters: a cost update

    International Nuclear Information System (INIS)

    Reed, S.A.; Wilson, J.V.

    1977-01-01

    This report, based on first-quarter 1977 dollars, is an update of costs presented in ORNL/TM-5070 (Rev.), which gave cost estimates for desalting seawater and brackish waters based on first-quarter 1975 financial parameters. Cost estimates are given for desalting seawater by distillation and reverse osmosis and for brackish waters using reverse osmosis and electrodialysis. Cost data were computed as a function of plant size and energy cost. The cost of generating steam and electrical energy on-site using coal-fired boilers as well as oil-fired boilers and dual-purpose electric/seawater distillation plants is included. While the costs of energy, equipment and labor have continued to rise, they have increased at a relatively modest rate compared with the two years prior to 1975. On an average, the cost of desalting seawater by distillation has increased approximately 15%. Costs for desalting brackish waters by the membrance processes have increased about 7%

  5. An estimate of the cost of electricity production from hot-dry rock

    International Nuclear Information System (INIS)

    Pierce, K.G.; Livesay, B.J.

    1993-01-01

    This paper gives an estimate of the cost to produce electricity from hot-dry rock (HDR). Employment of the energy in HDR for the production of electricity requires drilling multiple wells from the surface to the hot rock, connecting the wells through hydraulic fracturing, and then circulating water through the fracture system to extract heat from the rock. The basic HDR system modeled in this paper consists of an injection well, two production wells, the fracture system (or HDR reservoir), and a binary power plant. Water is pumped into the reservoir through the injection well where it is heated and then recovered through the production wells. Upon recovery, the hot water is pumped through a heat exchanger transferring heat to the binary, or working, fluid in the power plant. The power plant is a net 5.1-MW e binary plant employing dry cooling. Make-up water is supplied by a local well. In this paper, the cost of producing electricity with the basic system is estimated as the sum of the costs of the individual parts. The effects on cost of variations to certain assumptions, as well as the sensitivity of costs to different aspects of the basic system, are also investigated

  6. Public synthesis of the reference costs study of the electric power production

    International Nuclear Information System (INIS)

    2008-01-01

    Every 3 or 5 years, the DGEC published the reference costs study of the electric power production which evaluates, in a theoretical framework, the total cost of an electrical MWh, from different production ways. These studies bring information for the definition of the energy policy and the elaboration of the investments program. because of the great competition of the market, it was decided not to publish the absolute value of the hypothesis and the results but under indexed form. (A.L.B.)

  7. Management of busbar costs and spending tradeoffs for the transition to competitive markets in electricity

    International Nuclear Information System (INIS)

    Corio, M.R.; Boyd, G.

    1995-01-01

    Competition is changing the fundamental basis for doing business in the electricity generation market. As the market moves toward competitive market conditions, electricity will be viewed increasingly as a commodity--not only supplied to customers within a utility's service area, but brokered and marketed outside its area as well. With movement toward retail wheeling being considered in California, Michigan, and New York, it may soon become a reality as well. This means that a utility can no longer feel secure as the monopoly supplier of electricity within its own franchise area. To remain the main supplier in its current service area and compete for customers in other service areas, utilities will need to understand and examine all the components of ''busbar costs'' at its generating units. As competition drives the market to marginal costs, generating units with costs exceeding the market clearing price for electricity may soon have a limited role in the generation market. As the industry evolves, competition in the marketplace will force uneconomic plants to reduce costs or go out of business. This paper discusses results of studies addressing the evaluation of cost effectiveness, benchmarking of cost-efficiency, and development of marginal cost curves for busbar costs based on the development and aggregation of the three key measures which determine the cost and level of output (generation): (1) reliability; (2) heat rate; and (3) planned outage factor

  8. Management of busbar costs and spending tradeoffs for the transition to competitive markets in electricity

    Energy Technology Data Exchange (ETDEWEB)

    Corio, M.R.; Boyd, G. [Applied Economic Research Co., Inc., New York, NY (United States)

    1995-09-01

    Competition is changing the fundamental basis for doing business in the electricity generation market. As the market moves toward competitive market conditions, electricity will be viewed increasingly as a commodity--not only supplied to customers within a utility`s service area, but brokered and marketed outside its area as well. With movement toward retail wheeling being considered in California, Michigan, and New York, it may soon become a reality as well. This means that a utility can no longer feel secure as the monopoly supplier of electricity within its own franchise area. To remain the main supplier in its current service area and compete for customers in other service areas, utilities will need to understand and examine all the components of ``busbar costs`` at its generating units. As competition drives the market to marginal costs, generating units with costs exceeding the market clearing price for electricity may soon have a limited role in the generation market. As the industry evolves, competition in the marketplace will force uneconomic plants to reduce costs or go out of business. This paper discusses results of studies addressing the evaluation of cost effectiveness, benchmarking of cost-efficiency, and development of marginal cost curves for busbar costs based on the development and aggregation of the three key measures which determine the cost and level of output (generation): (1) reliability; (2) heat rate; and (3) planned outage factor.

  9. Joint Costs in Electricity and Natural Gas Distribution Infrastructures: The Role of Urban Factors

    Directory of Open Access Journals (Sweden)

    Muzeyyen Anil Senyel

    2018-04-01

    Full Text Available This paper analyzes the joint cost structure of electricity and natural gas distribution investments. Assessing the joint costs is critical for urban development and public policy regarding competition at the local level. The paper accounts for the urban and geographic factors at the local level, while the previous literature primarily used company-level data with a few or no site-specific variables in joint cost analyses. An empirical analysis of the multi-utility capital costs suggests that the local urban and geographic conditions affect such costs, with economies of scope present in electricity and natural gas both in terms of total costs and underground investment costs. Hence, the joint service provision makes economic and environmental sense for urban policy makers.

  10. China’s electric vehicle subsidy scheme: Rationale and impacts

    International Nuclear Information System (INIS)

    Hao, Han; Ou, Xunmin; Du, Jiuyu; Wang, Hewu; Ouyang, Minggao

    2014-01-01

    To promote the market penetration of electric vehicles (EV), China launched the Electric Vehicle Subsidy Scheme (EVSS) in Jan 2009, followed by an update in Sep 2013, which we named phase I and phase II EVSS, respectively. In this paper, we presented the rationale of China’s two-phase EVSS and estimated their impacts on EV market penetration, with a focus on the ownership cost analysis of battery electric passenger vehicles (BEPV). Based on the ownership cost comparison of five defining BEPV models and their counterpart conventional passenger vehicle (CPV) models, we concluded that in the short term, especially before 2015, China’s EVSS is very necessary for BEPVs to be cost competitive compared with CPVs. The transition from phase I to phase II EVSS will generally reduce subsidy intensity, thus resulting in temporary rise of BEPV ownership cost. However, with the decrease of BEPV manufacturing cost, the ownership cost of BEPV is projected to decrease despite of the phase-out mechanism under phase II EVSS. In the mid term of around 2015–2020, BEPV could become less or not reliant on subsidy to maintain cost competitiveness. However, given the performance disadvantages of BEPV, especially the limited electric range, China’s current EVSS is not sufficient for the BEPV market to take off. Technology improvement associated with battery cost reduction has to play an essential role in starting up China’s BEPV market. - Highlights: • China’s phase I and phase II electric vehicle subsidy schemes were reviewed. • Major electric vehicle models in China’s vehicle market were reviewed. • The ownership costs of five defining electric passenger vehicle models were compared. • Policies to promote electric vehicle deployment in China were discussed

  11. Joint environmental and cost efficiency analysis of electricity generation

    International Nuclear Information System (INIS)

    Welch, Eric; Barnum, Darold

    2009-01-01

    Fossil-fuel based electricity generation produces the largest proportion of human-related carbon pollution in the United States. Hence, fuel choices by steam plants are key determinants of the industry's impact on national and global greenhouse gas emissions, and key foci for climate change policy. Yet, little research has been done to examine the economic and environmental tradeoffs among the different types of fuels that are used by these plants. This paper applies a Data Envelopment Analysis procedure that incorporates the materials balance principle to estimate the allocations of coal, gas and oil inputs that minimize carbon emissions and costs. Using EIA 906 and FERC 423 data, the paper estimates cost/carbon tradeoffs facing two sets of plants: those that use coal and gas inputs, and those that use coal, gas and oil inputs. Findings for our three-input sample show that there would be a 79% increase in cost for moving from the cost-efficient point to the carbon efficient point, while there would be a 38% increase in carbon for moving from the carbon efficient point to the cost-efficient point. These conclusions indicate that, in general, the gap between efficient cost and efficient environmental production is wide, and would require substantial policy intervention, technological change or market adjustment before it could be narrowed. However, our examination of individual plants shows that what is true in general is often not true for specific plants. Some plants that are currently less efficient than those on the production frontier could produce the same amount of electricity with less carbon output and less fuel input. Additionally, many plants on the production frontier could improve both cost and carbon efficiency by changing their mixture of fossil-fuel inputs. (author)

  12. The delivery of low-cost, low-carbon rural energy services

    Energy Technology Data Exchange (ETDEWEB)

    Casillas, Christian E., E-mail: cecasillas@berkeley.edu [Energy and Resources Group, University of California, Berkeley (United States); Kammen, Daniel M. [Energy and Resources Group, University of California, Berkeley (United States); Goldman School of Public Policy, University of California, Berkeley, CA 94720 (United States); The World Bank, Washington, DC 20433 (United States)

    2011-08-15

    The provision of both electrical and mechanical energy services can play a critical role in poverty alleviation for the almost two billion rural users who currently lack access to electricity. Distributed generation using diesel generators remains a common means of electricity provision for rural communities throughout the world. Due to rising fuel costs, the need to address poverty, and consequences of global warming, it is necessary to develop cost efficient means of reducing fossil fuel consumption in isolated diesel microgrids. Based on a case study in Nicaragua, a set of demand and supply side measures are ordered by their annualized costs in order to approximate an energy supply curve. The curve highlights significant opportunities for reducing the costs of delivering energy services while also transitioning to a carbon-free electrical system. In particular, the study demonstrates the significant cost savings resulting from the implementation of conventional metering, efficient residential lighting, and electricity generation using renewable energy sources. - Highlights: > We present a case study of conservation measures implemented in a diesel microgrid. > An energy conservation and supply curve is constructed using additional measures. > Energy efficiency and renewable energy result in cost savings and carbon abatement. > We discuss weaknesses of energy supply and carbon abatement curve calculations

  13. Superphenix set to rise again

    International Nuclear Information System (INIS)

    Dorozynski, A.

    1993-01-01

    Superphenix, France's seemingly jinxed fast breeder reactor, which has not produced a single kilowatt of energy in more than 3 years, looks set to rise up next year like the mythical bird it is named after. The $5 billion reactor, the largest fast breeder in the world, has just been given the seal of approval by a public commission ordered by the government to look at the pros and cons of restarting. It still has hoops to jump through: a safety check and approval from the ministries of industries and environment. But the consortium of French, Italian, and German power utilities that run the plant are confident they can get it running by next summer. The Superphenix that rises out of the ashes will, however, be a different species of bird from the one planned 20 years ago. The consortium plans to turn the reactor into a debreeder, one that will incinerate more plutonium than it produces and so eat into Europe's plutonium stockpile. Calculations by Superphenix staff and the Atomic Energy Commission indicate that a plutonivorous fast breeder could incinerate 15 to 25 kilograms of plutonium while producing 1 billion kilowatt-hours of electricity-scarcely enough to make a dent in the tonnes of plutonium produced by Electricite de France's reactors each year. The Superphenix consortium is anxious to get the reactor back on line. The annual cost of upkeep and repair of the idle plant and salaries for its 700 staff may reach $140 million this year, 20% more than if the plant was running normally. If restarted, the existing core and a second one ready on the shelf will generate electricity worth $1.3 billion

  14. Review of OECD study into 'Projected costs of generating electricity-2010 Edition'

    International Nuclear Information System (INIS)

    Khatib, Hisham

    2010-01-01

    This joint report by the International Energy Agency (IEA) and the OECD Nuclear Energy Agency (NEA) is the seventh in the long established series of studies into electricity generating costs. It presents the main results of the work carried out in 2009 for calculating the costs of generating baseload electricity. The study is quite comprehensive in covering almost all financial aspects facing investors in the electricity generating system. Therefore this study although useful, its usefulness lies in explaining methodologies, mentioning factors that affect investment and cost, educating planners and improving investment evaluation and planning methodologies, its resulting figures and cost comparisons are however controversial. Generation planning and investments are case and country specific, and should be studied correspondingly and as close as possible to the timing of decision making to take account of trends. Most likely such case specific results will differ from figures calculated in the study. Therefore we need to emphasize a key conclusion of the study which is 'that country-specific circumstances determine the LCOE'; it is this that needs to be considered and not the results represented in the study.

  15. Consideration of environmental externality costs in electric utility resource selections and regulation

    International Nuclear Information System (INIS)

    Ottinger, R.L.

    1990-01-01

    A surprising number of state electric utility regulatory commissions (half) have started to require consideration of environmental externality costs in utility planning and resource selection. The principal rationale for doing so is that electric utility operations impose very real and large damages to human health and the environment which are not taken into account by traditional utility least cost planning, resource selection procedures, or by government pollution regulation. These failures effectively value the residual environmental costs to society of utility operations at zero. The likely future prospect for more stringent governmental pollution regulation renders imprudent the selection of resources without taking environmental externality costs into consideration. Most regulatory commissions requiring environmental externality consideration have left it to the utilities to compute the societal costs, although a few have either set those costs themselves or used a proxy adder to polluting resource costs (or bonus for non-polluting resources). These commissions have used control or pollution mitigation costs, rather than societal damage costs, in their regulatory computations. This paper recommends that damage costs be used where adequate studies exist to permit quantification, discusses the methodologies for their measurement, and describes the means that have been and might be used for their incorporation

  16. Comparing the Mass, Energy, and Cost Effects of Lightweighting in Conventional and Electric Passenger Vehicles

    OpenAIRE

    Hofer, Johannes; Wilhelm, Erik; Schenler, Warren

    2014-01-01

    In this work the effect of weight reduction using advanced lightweight materials on the mass, energy use, and cost of conventional and battery electric passenger vehicles is compared. Analytic vehicle simulation is coupled with cost assessment to find the optimal degree of weight reduction minimizing manufacturing and total costs. The results show a strong secondary weight and cost saving potential for the battery electric vehicles, but a higher sensitivity of vehicle energy use to mass reduc...

  17. The rise of low-cost sensing for managing air pollution in cities.

    Science.gov (United States)

    Kumar, Prashant; Morawska, Lidia; Martani, Claudio; Biskos, George; Neophytou, Marina; Di Sabatino, Silvana; Bell, Margaret; Norford, Leslie; Britter, Rex

    2015-02-01

    Ever growing populations in cities are associated with a major increase in road vehicles and air pollution. The overall high levels of urban air pollution have been shown to be of a significant risk to city dwellers. However, the impacts of very high but temporally and spatially restricted pollution, and thus exposure, are still poorly understood. Conventional approaches to air quality monitoring are based on networks of static and sparse measurement stations. However, these are prohibitively expensive to capture tempo-spatial heterogeneity and identify pollution hotspots, which is required for the development of robust real-time strategies for exposure control. Current progress in developing low-cost micro-scale sensing technology is radically changing the conventional approach to allow real-time information in a capillary form. But the question remains whether there is value in the less accurate data they generate. This article illustrates the drivers behind current rises in the use of low-cost sensors for air pollution management in cities, while addressing the major challenges for their effective implementation. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. Evaluation of actual costs of power sources and effects on balance sheets of electric utilities

    International Nuclear Information System (INIS)

    Matsuo, Yuji; Yamaguchi, Yuji; Murakami, Tomoko

    2013-01-01

    After the Fukushima nuclear accident, almost all nuclear power stations continued to stop operation and sharp increase of purchase costs of fossil fuels forced some electric utilities to suffer a deficit. This article presented quantitative analysis of effects of present state on power costs and balance sheets of electric utilities. Levelized costs of electricity increased from 8.6 ¥/kWh (2010) to 11.6 ¥/kWh (2011) and 12.6 ¥/kWh (2012). Total power costs increased from 7.5 Trillion¥(2010) to 9.5 Trillion¥(2011). Due to increase of cost of fossil fuel compensated for nuclear power, electric utilities suffered a net loss of 0.8 Trillion¥ and decreased surplus to 2.5 Trillion¥ in 2011. Net loss of 1.3 Trillion¥ and surplus of 1.2 Trillion¥ was estimated for 2012. This state was beyond the limit of utilities' efforts to reduce costs and uncertain share of power sources became a great risk. Future share of power sources should be judged appropriately from various standpoints (costs, stable supply, energy security and national economic growth) and early public dissemination of new philosophy on share of power sources was highly required. (T. Tanaka)

  19. Probabilistic Analysis of Electrical Energy Costs: Comparing Production Costs for Gas, Coal and Nuclear Power Plants. Annex III

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-12-15

    The increase in electricity demand is linked to the development of the economy and living standards in each country. This is especially true in those developing countries in which electricity consumption is far below the average of industrialized countries. To satisfy the increased demand for electricity, it is necessary to build new electrical power plants that could, in an optimum way, meet the imposed acceptability criteria. The main criteria are the potential to supply the required energy and to supply it with minimum or, at least, acceptable costs and environmental impacts, to satisfy the licensing requirements and be acceptable to the public. The main competitors for electricity production in the next few decades are fossil fuel power plants (coal and gas) and nuclear power plants. Power plants making use of renewables (solar, wind, biomass) are also important, but due to limited energy supply potential and high costs, can only be a supplement to the main generating units. Large hydropower plants would be competitive under the condition that suitable sites for the construction of such plants exist. Unfortunately, both in Croatia and in the rest of central Europe, such sites are scarce.

  20. The costs of electricity interruptions in Spain. Are we sending the right signals?

    International Nuclear Information System (INIS)

    Linares, Pedro; Rey, Luis

    2013-01-01

    One of the objectives of energy security is the uninterrupted physical availability of energy. However, there is limited information about how much is the cost of energy supply interruptions. This information is essential to optimize investment and operating decisions to prevent energy shortages, or, alternatively, to determine the strength of the signals to be sent to the agents so that they may invest accordingly. In this paper, we estimate the economic impact of an electricity interruption in different sectors and regions of Spain. Although there are several caveats in our analysis, we find that in 2008 the cost for the Spanish economy of one kWh of electricity not supplied was above €4 even in a conservative scenario, which is higher than the signals currently being sent as incentives to avoid these interruptions. This might result in an underinvestment in short-term energy security, particularly when we add the usual risk aversion of most consumers. - Highlights: • We calculate the costs of electricity interruptions in Spain. • We find that in 2008 the cost for the Spanish economy of one kWh of electricity not supplied was around €6. • The results imply that Spain is underinvesting in short-term energy security

  1. Levelized Costs for Nuclear, Gas and Coal for Electricity, under the Mexican Scenario

    Energy Technology Data Exchange (ETDEWEB)

    Palacios, J.C.; Alonso, G.; Ramirez, R.; Gomez, A.; Ortiz, J.; Longoria, L.C.

    2004-10-06

    In the case of new nuclear power stations, it is necessary to pay special attention to the financial strategy that will be applied, time of construction, investment cost, and the discount and return rate. The levelized cost quantifies the unitary cost of the electricity (the kWh) generated during the lifetime of the nuclear power plant; and allows the immediate comparison with the cost of other alternative technologies. The present paper shows levelized cost for different nuclear technologies and it provides comparison among them as well as with gas and coal electricity plants. For the calculations we applied our own methodology to evaluate the levelized cost considering investment, fuel and operation and maintenance costs, making assumptions for the Mexican market, and taking into account the gas prices projections. The study also shows comparisons using different discount rates (5% and 10%), and some comparisons between our results and an OECD 1998 study. The results are i n good agreement and shows that nuclear option is cost competitive in Mexico on the basis of levelized costs.

  2. Levelized Costs for Nuclear, Gas and Coal for Electricity, under the Mexican Scenario

    International Nuclear Information System (INIS)

    Palacios, J.C.; Alonso, G.; Ramirez, R.; Gomez, A.; Ortiz, J.; Longoria, L.C.

    2004-01-01

    In the case of new nuclear power stations, it is necessary to pay special attention to the financial strategy that will be applied, time of construction, investment cost, and the discount and return rate. The levelized cost quantifies the unitary cost of the electricity (the kWh) generated during the lifetime of the nuclear power plant; and allows the immediate comparison with the cost of other alternative technologies. The present paper shows levelized cost for different nuclear technologies and it provides comparison among them as well as with gas and coal electricity plants. For the calculations we applied our own methodology to evaluate the levelized cost considering investment, fuel and operation and maintenance costs, making assumptions for the Mexican market, and taking into account the gas prices projections. The study also shows comparisons using different discount rates (5% and 10%), and some comparisons between our results and an OECD 1998 study. The results are i n good agreement and shows that nuclear option is cost competitive in Mexico on the basis of levelized costs

  3. Electricity demand of manufacturing sector in Turkey. A translog cost approach

    International Nuclear Information System (INIS)

    Boeluek, Guelden; Koc, A. Ali

    2010-01-01

    This paper models factor demand for manufacturing sector in Turkey. We estimated a translog cost function with four factor consist of capital, labor, intermediate input and electricity over the 1980-2001. Our objective, taking in the consideration electricity as production input, was twofold: on the one hand, to estimate the price elasticity of electricity demand in manufacturing sector, and on the other hand to use cross-price and Morishima Elasticities of Substitution results for structural analysis regarding effects of electricity liberalization which initiated in 2001. Empirical result shows that electricity demand is relatively price sensitive (- 0.85). Our result in terms of electricity price is consistent with the previous studies. While electricity-labor and electricity-capital inputs are complementary, results indicate the existence of substitution possibilities between electricity and intermediate input. This means that changes in electricity prices have impact on labor demand and investment demand. These results have important implications for public policy. (author)

  4. Electricity demand of manufacturing sector in Turkey. A translog cost approach

    Energy Technology Data Exchange (ETDEWEB)

    Boeluek, Guelden; Koc, A. Ali [Akdeniz University, Department of Economics, Antalya, 07058 (Turkey)

    2010-05-15

    This paper models factor demand for manufacturing sector in Turkey. We estimated a translog cost function with four factor consist of capital, labor, intermediate input and electricity over the 1980-2001. Our objective, taking in the consideration electricity as production input, was twofold: on the one hand, to estimate the price elasticity of electricity demand in manufacturing sector, and on the other hand to use cross-price and Morishima Elasticities of Substitution results for structural analysis regarding effects of electricity liberalization which initiated in 2001. Empirical result shows that electricity demand is relatively price sensitive (- 0.85). Our result in terms of electricity price is consistent with the previous studies. While electricity-labor and electricity-capital inputs are complementary, results indicate the existence of substitution possibilities between electricity and intermediate input. This means that changes in electricity prices have impact on labor demand and investment demand. These results have important implications for public policy. (author)

  5. Comparative costs of electricity generation: a Canadian perspective

    International Nuclear Information System (INIS)

    Moore, B.; Guindon, S.

    1998-01-01

    The cost of generation will be a critical factor in the decision making process for electric power utilities in the years ahead as plans for new capacity are made under the pressures of a more competitive, deregulated market. Technologies with low capital, fuel and operating costs, short construction schedules, capacity closely matched to load growth and minimal regulatory/public acceptance problems are generally more attractive. As the Levelized Unit Energy Cost (LUEC) studies show, natural gas plants require ready access to low-cost supply of natural gas in order to compete. In areas with access to large supplies of low cost natural gas, it is therefore quite likely that natural gas turbines will be chosen, perhaps in combined cycles, for the next round of capacity increases in order to minimize financial risks. From a cost perspective, the challenge for the nuclear industry in Canada is to ensure, in the short to medium term, that the existing plants reach their full operating life and that they operate consistently at high capacity factors. In the longer term, improvements which lower the capital costs of nuclear plants, decrease construction times and increase capacity utilization factors will enhance the competitiveness of the nuclear option

  6. Hydropower Impacts on Electrical System Production Costs in the Southwest United States

    Directory of Open Access Journals (Sweden)

    Dominique M. Bain

    2018-02-01

    Full Text Available The Colorado River is an important natural resource for the Southwestern United States. Predicted climate change impacts include increased temperature, decreased rainfall and increased probability of drought in this region. Given the large amount of hydropower on the Colorado River and its importance to the bulk electricity system, this purpose of this study was to quantify the value hydropower in operating the electrical system, and examined changes in hydropower value and electricity costs under different possible future drought conditions and regional generation scenarios. The goal was to better understand how these scenarios affect operating costs of the bulk electrical system, as well as the value of the hydropower produced, and proposed a method for doing so. The calculated value of the hydroelectric power was nearly double the mean locational marginal price in the study area, about $73 to $75 for most scenarios, demonstrating a high value of the hydropower. In general, it was found that reduced water availability increased operating costs, and increased the value of the hydropower. A calculated value factor showed that when less hydroelectric power is available, the hydropower is more valuable. Furthermore, the value factor showed that the value of hydro increases with the addition of solar or the retirement of thermal generating resources.

  7. Commerical electric power cost studies. Capital cost addendum multi-unit coal and nuclear stations

    International Nuclear Information System (INIS)

    1977-09-01

    This report is the culmination of a study performed to develop designs and associated capital cost estimates for multi-unit nuclear and coal commercial electric power stations, and to determine the distribution of these costs among the individual units. This report addresses six different types of 2400 MWe (nominal) multi-unit stations as follows: Two Unit PWR Station-1139 MWe Each, Two Unit BWR Station-1190 MWe Each, Two Unit High Sulfur Coal-Fired Station-1232 MWe Each, Two Unit Low Sulfur Coal-Fired Station-1243 MWe Each, Three Unit High Sulfur Coal-Fired Station-794 MWe Each, Three Unit Low Sulfur Coal-Fired Station-801 MWe Each. Recent capital cost studies performed for ERDA/NRC of single unit nuclear and coal stations are used as the basis for developing the designs and costs of the multi-unit stations. This report includes the major study groundrules, a summary of single and multi-unit stations total base cost estimates, details of cost estimates at the three digit account level and plot plan drawings for each multi-unit station identified

  8. Westinghouse AP1000 Electrical Generation Costs - Meeting Marketplace Requirements

    International Nuclear Information System (INIS)

    Paulson, C. Keith

    2002-01-01

    The re-emergence of nuclear power as a leading contender for new base-load electrical generation is not an occurrence of happenstance. The nuclear industry, in general, and Westinghouse, specifically, have worked diligently with the U.S. power companies and other nuclear industry participants around the world to develop future plant designs and project implementation models that address prior problem areas that led to reduced support for nuclear power. In no particular order, the issues that Westinghouse, as an engineering and equipment supply company, focused on were: safety, plant capital costs, construction schedule reductions, plant availability, and electric generation costs. An examination of the above criteria quickly led to the conclusion that as long as safety is not compromised, simplifying plant designs can lead to positive progress of the desired endpoints for the next and later generations of nuclear units. The distinction between next and later generations relates to the readiness of the plant design for construction implementation. In setting requirement priorities, one axiom is inviolate: There is no exception, nor will there be, to the Golden Rule of business. In the electric power generation industry, once safety goals are met, low generation cost is the requirement that rules, without exception. The emphasis in this paper on distinguishing between next and later generation reactors is based on the recognition that many designs have been purposed for future application, but few have been able to attain the design pedigree required to successfully meet the requirements for next generation nuclear units. One fact is evident: Another generation of noncompetitive nuclear plants will cripple the potential for nuclear to take its place as a major contributor to new electrical generation. Only two plant designs effectively meet the economic tests and demonstrate both unparalleled safety and design credibility due to extensive progress toward engineering

  9. Results from the OECD report on international projections of electricity generating costs

    International Nuclear Information System (INIS)

    Paffenbarger, J.A.; Bertel, E.

    1998-01-01

    The International Energy Agency and Nuclear Energy Agency of the OECD have periodically undertaken a joint study on electricity generating costs in OECD Member countries and selected non-Member countries. This paper presents key results from the 1998 update of this study. Experts from 19 countries drawn from electric utility companies and government provided data on capital costs, operating and maintenance costs, and fuel costs from which levelized electricity generating costs (US cents/kWh) for baseload power plants were estimated in each country using a common set of economic assumptions. Light water nuclear power plants, pulverized coal plants, and natural gas-fired combined cycle gas turbines were the principal options evaluated. five and 10% discount rates, 40-year operating lifetime, and 75% annual load factor were the base assumptions, with sensitivity analyses on operating lifetime and load factor. Fuel costs and fuel escalation were provided individually by country, with a sensitivity case to evaluate costs assuming no real fuel price escalation over plant lifetimes. Of the three principal fuel/technology options, none is predominantly the cheapest option for all economic assumptions. However, fossil-fueled options are generally estimated to be the least expensive option. The study confirms that gas-fired combined cycles have improved their economic performance in most countries in recent years and are strong competitors to nuclear and coal-fired plants. Eleven out of the 18 countries with two or more options show gas-fired plants to be the cheapest option at 10% discount rate. Coal remains a strong competitor to gas when lower discount rates are used. Nuclear is the least expensive at both 5 and 10% discount rate in only two countries. Generally, with gas prices above 5 US$/GJ, nuclear plants constructed at overnight capital costs below 1 650 $/kWe have the potential to be competitive only at lower discount rates

  10. A probabilistic approach to the computation of the levelized cost of electricity

    International Nuclear Information System (INIS)

    Geissmann, Thomas

    2017-01-01

    This paper sets forth a novel approach to calculate the levelized cost of electricity (LCOE) using a probabilistic model that accounts for endogenous input parameters. The approach is applied to the example of a nuclear and gas power project. Monte Carlo simulation results show that a correlation between input parameters has a significant effect on the model outcome. By controlling for endogeneity, a statistically significant difference in the mean LCOE estimate and a change in the order of input leverages is observed. Moreover, the paper discusses the role of discounting options and external costs in detail. In contrast to the gas power project, the economic viability of the nuclear project is considerably weaker. - Highlights: • First model of levelized cost of electricity accounting for uncertainty and endogeneities in input parameters. • Allowance for endogeneities significantly affects results. • Role of discounting options and external costs is discussed and modelled.

  11. Hybrid 21 MW wind-solar system to limit energy costs at an industrial plant

    International Nuclear Information System (INIS)

    López, C.

    2016-01-01

    Ereda has undertaken a project that aims to analyse the possibility of limiting the cost of the energy supply to a medium-sized industrial plant, with an installed capacity of over 26 MW, located in the south-west of Kazakhstan. The cost of electricity for its processes accounts for an important part of its production cost, achieving values in excess of 40%. The price of electricity in the country is expected to rise over the coming years. In addition, the plant is now required to reduce CO2 emissions from its industrial activity, which is why a further cost arising from the acquisition of emissions rights is expected in future. (Author)

  12. Risks, revenues and investment in electricity generation. Why policy needs to look beyond costs

    International Nuclear Information System (INIS)

    Gross, Robert; Heptonstall, Philip; Blyth, William

    2010-01-01

    Energy policy goals frequently depend upon investment in particular technologies, or categories of technology. Whilst the British government has often espoused the virtues of technological neutrality, UK policies now seek to promote nuclear power, coal with CO 2 capture and storage, and renewable energy. Policy decisions are often informed by estimates of cost per unit of output (for example, pound /MWh), also known as levelised costs. Estimates of these costs for different technologies are often used to provide a 'ballpark' guide to the levels of financial support needed (if any) to encourage uptake, or direct investment away from the technologies the market might otherwise have chosen. Levelised cost estimates can also help to indicate the cost of meeting public policy objectives, and whether there is a rationale for intervention (for example, based on net welfare gains). In the UK electricity sector, investment is undertaken by private companies, not governments. Investment is driven by expected returns, in the light of a range of risks related to both costs and revenues. Revenue risks are not captured in estimates of cost or cost-related risks. An important category of revenue risk is associated with electricity price fluctuations. Exposure to price risks differs by technology. Low electricity prices represent a revenue risk to technologies that cannot influence electricity prices. By contrast, 'price makers' that set marginal prices are, to an extent, able to pass fuel price increases through to consumers. They have an inherent 'hedge' against fuel and electricity price fluctuations. Based on recent research by the UK Energy Research Centre, this paper considers the implications of such price risks for policy design. The authors contrast the range of levelised costs estimated for different generating options with the spread of returns each is exposed to when electricity price fluctuations are factored in. Drawing on recent policy experiences in the renewable

  13. SunShot solar power reduces costs and uncertainty in future low-carbon electricity systems.

    Science.gov (United States)

    Mileva, Ana; Nelson, James H; Johnston, Josiah; Kammen, Daniel M

    2013-08-20

    The United States Department of Energy's SunShot Initiative has set cost-reduction targets of $1/watt for central-station solar technologies. We use SWITCH, a high-resolution electricity system planning model, to study the implications of achieving these targets for technology deployment and electricity costs in western North America, focusing on scenarios limiting carbon emissions to 80% below 1990 levels by 2050. We find that achieving the SunShot target for solar photovoltaics would allow this technology to provide more than a third of electric power in the region, displacing natural gas in the medium term and reducing the need for nuclear and carbon capture and sequestration (CCS) technologies, which face technological and cost uncertainties, by 2050. We demonstrate that a diverse portfolio of technological options can help integrate high levels of solar generation successfully and cost-effectively. The deployment of GW-scale storage plays a central role in facilitating solar deployment and the availability of flexible loads could increase the solar penetration level further. In the scenarios investigated, achieving the SunShot target can substantially mitigate the cost of implementing a carbon cap, decreasing power costs by up to 14% and saving up to $20 billion ($2010) annually by 2050 relative to scenarios with Reference solar costs.

  14. Network cost in transmission and distribution of electric power

    International Nuclear Information System (INIS)

    Lindahl, A.; Naeslund, B.; Oettinger-Biberg, C.; Olander, H.; Wuolikainen, T.; Fritz, P.

    1994-01-01

    This report is divided in two parts, where part 1 treats the charges on the regional nets with special emphasis on the net owners tariffs on a deregulated market. Part 2 describes the development of the network costs in electric power distribution for the period 1991-1993. 11 figs, 33 tabs

  15. Comparison study on models for calculation of NPP’s levelized unit electricity cost

    International Nuclear Information System (INIS)

    Nuryanti; Mochamad Nasrullah; Suparman

    2014-01-01

    Economic analysis that is generally done through the calculation of Levelized Unit Electricity Cost (LUEC) is crucial to be done prior to any investment decision on the nuclear power plant (NPP) project. There are several models that can be used to calculate LUEC, which are: R&D PT. PLN (Persero) Model, Mini G4ECONS model and Levelized Cost model. This study aimed to perform a comparison between the three models. Comparison technique was done by tracking the similarity used for each model and then given a case of LUEC calculation for SMR NPP 2 x 100 MW using these models. The result showed that the R&D PT. PLN (Persero) Model have a common principle with Mini G4ECONS model, which use Capital Recovery Factor (CRF) to discount the investment cost which eventually become annuity value along the life of plant. LUEC on both models is calculated by dividing the sum of the annual investment cost and the cost for operating NPP with an annual electricity production.While Levelized Cost model based on the annual cash flow. Total of annual costs and annual electricity production were discounted to the first year of construction in order to obtain the total discounted annual cost and the total discounted energy generation. LUEC was obtained by dividing both of the discounted values. LUEC calculations on the three models produce LUEC value, which are: 14.5942 cents US$/kWh for R&D PT. PLN (Persero) Model, 15.056 cents US$/kWh for Mini G4ECONs model and 14.240 cents US$/kWh for Levelized Cost model. (author)

  16. Comparison of electricity production costs of nuclear and coal-fired power plants

    International Nuclear Information System (INIS)

    Peltzer, M.

    1980-01-01

    Electricity production costs of nuclear and coal-fired power plants their structure and future development are calculated and compared. Assumed beginning of operation is in the mid-1980. The technical and economical data are based on a nuclear power unit of 1 300 MW and on a coal-fired twin plant of 2 x 750 MW. The study describes and discusses the calculational method and the results. The costs for the electricity generation show an economic advantage for nuclear power. A sensitivity analysis shows that these results are valid also for changed input parameters. (orig.) [de

  17. Marginal Cost Pricing in a World without Perfect Competition: Implications for Electricity Markets with High Shares of Low Marginal Cost Resources

    Energy Technology Data Exchange (ETDEWEB)

    Frew, Bethany A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Clark, Kara [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bloom, Aaron P. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Milligan, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-12-02

    A common approach to regulating electricity is through auction-based competitive wholesale markets. The goal of this approach is to provide a reliable supply of power at the lowest reasonable cost to the consumer. This necessitates market structures and operating rules that ensure revenue sufficiency for all generators needed for resource adequacy purposes. Wholesale electricity markets employ marginal-cost pricing to provide cost-effective dispatch such that resources are compensated for their operational costs. However, marginal-cost pricing alone cannot guarantee cost recovery outside of perfect competition, and electricity markets have at least six attributes that preclude them from functioning as perfectly competitive markets. These attributes include market power, externalities, public good attributes, lack of storage, wholesale price caps, and ineffective demand curve. Until (and unless) these failures are ameliorated, some form of corrective action(s) will be necessary to improve market efficiency so that prices can correctly reflect the needed level of system reliability. Many of these options necessarily involve some form of administrative or out-of-market actions, such as scarcity pricing, capacity payments, bilateral or other out-of-market contracts, or some hybrid combination. A key focus with these options is to create a connection between the electricity market and long-term reliability/loss-of-load expectation targets, which are inherently disconnected in the native markets because of the aforementioned market failures. The addition of variable generation resources can exacerbate revenue sufficiency and resource adequacy concerns caused by these underlying market failures. Because variable generation resources have near-zero marginal costs, they effectively suppress energy prices and reduce the capacity factors of conventional generators through the merit-order effect in the simplest case of a convex market; non-convexities can also suppress prices.

  18. The Future of Electricity Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Kahrl, Fredrich [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Mills, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Lavin, Luke [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Ryan, Nancy [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Olsen, Arne [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Schwartz, Lisa [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-09-14

    Electricity resource planning is the process of identifying longer-term investments to meet electricity reliability requirements and public policy goals at a reasonable cost. Resource planning processes provide a forum for regulators, electric utilities, and electricity industry stakeholders to evaluate the economic, environmental, and social benefits and costs of different investment options. By facilitating a discussion on future goals, challenges and strategies, resource planning processes often play an important role in shaping utility business decisions. Resource planning emerged more than three decades ago in an era of transition, where declining electricity demand and rising costs spurred fundamental changes in electricity industry regulation and structure. Despite significant changes in the industry, resource planning continues to play an important role in supporting investment decision making. Over the next two decades, the electricity industry will again undergo a period of transition, driven by technological change, shifting customer preferences and public policy goals. This transition will bring about a gradual paradigm shift in resource planning, requiring changes in scope, approaches and methods. Even as it changes, resource planning will continue to be a central feature of the electricity industry. Its functions — ensuring the reliability of high voltage (“bulk”) power systems, enabling oversight of regulated utilities and facilitating low-cost compliance with public policy goals — are likely to grow in importance as the electricity industry enters a new period of technological, economic and regulatory change. This report examines the future of electricity resource planning in the context of a changing electricity industry. The report examines emerging issues and evolving practices in five key areas that will shape the future of resource planning: (1) central-scale generation, (2) distributed generation, (3) demand-side resources, (4

  19. Cost analysis of commercial pasteurization of orange juice by pulsed electric fields

    Science.gov (United States)

    The cost of pulsed electric field (PEF) pasteurization of orange juice was estimated. The cost analysis was based on processing conditions that met the US FDA (5 log reduction) requirement for fruit juice pasteurization and that achieved a 2 month microbial shelf-life. PEF-treated samples processed ...

  20. Time-of-Use Rates and Electricity Costs of Representative New York Dairy Farms

    OpenAIRE

    Boisvert, Richard N.; Bills, Nelson L.; Middagh, Mark C.; Schenkel, Mark

    1992-01-01

    Electric utilities throughout the Nation are experimenting with strategies to reduce total electricity consumption or to alter the timing of electrical power use by their customers. This report focuses on one such strategy, time-of-use (TaU) electric rates, and the likely effect of this pricing option on the New York dairy sector. The purpose of the study is to assess the change in farm electrical energy costs when power is sold to dairymen at higher rates for periods of peak power demand and...

  1. Energy and GHG abatement cost curves

    Energy Technology Data Exchange (ETDEWEB)

    Alvarenga, Rafael [BHP Billiton Base Metals (Australia)

    2010-07-01

    Global warming due to various reasons but especially to emission of green house gases (GHGs) has become a cause for serious concern. This paper discusses the steps taken by BHP Billiton to reduce energy consumption and GHG emissions using cost curves. According to forecasts, global warming is expected to impact Chile badly and the rise in temperature could be between 1 and more than 5 degrees Celsius. Mining in Chile consumes a lot of energy, particularly electricity. Total energy and electricity consumption in 2007 was 13 and 36 % respectively. BHP base metals developed a set of abatement cost curves for energy and GHG in Chile and these are shown in figures. The methodology for the curves consisted of consultant visits to each mine operation. The study also includes mass energy balance and feasibility maps. The paper concludes that it is important to evaluate the potential for reducing emissions and energy and their associated costs.

  2. Impact of electricity prices on foreign direct investment: Evidence from the European Union

    NARCIS (Netherlands)

    Bartekova, E.; Ziesemer, T.H.W.

    2015-01-01

    In the course of recent years growing concerns over increasing energy prices have emerged in the context of maintaining Europe’s international competitiveness. In particular, rising electricity price differentials adversely affect firms’ total production costs and ultimately impact their investment

  3. Construction costs of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Mandel, H

    1976-03-01

    It is assumed that the demand for electrical energy will continue to rise and that nuclear power will increasingly supply the base-load of electricity generation in the industrialized world. The author identifies areas where techniques and practices to control costs can be improved. Nuclear power offers an alternative to liquid and gaseous fossil fuels and contributes to a relative stability in the price of electric energy. Nuclear power plants can now generate power more cheaply than other thermal power plants down into the upper middle load sector, as indicated in calculations based on a construction time of six years for nuclear plants and four years for others. Special legal provisions, different conditions of financing and taxation, varying methods of power generation cost accounting, and the nonuniform layout of the plant in the various countries make it difficult to compare power generation costs. The author uses mostly experiences gained in the Federal Republic of Germany for some calculations for comparison; he cites lack of standardization and over-long licensing times as major factors in the recent rapid escalation of nuclear power costs and suggests that adoption of standard reactor designs, encouragement of a vigorous and competitive European nuclear industry, and streamlining of licensing procedures to improve the situation. (MCW)

  4. Revival of nuclear power engineering in the Central-Eastern Europe in response to rising power demand and the problem of CO2 emission

    Energy Technology Data Exchange (ETDEWEB)

    Rozkosz, Grazyna; Kaszowski, Bartosz

    2010-09-15

    Safety and reliability of electric power supply is guarantee for stable development. Necessity of decommissioning of largely depreciated power plants and rising power demands (average ca. 3% per year) may cause energy deficit in CE Europe. Decision on construction new power plants is determined mainly by power energy generation costs. Nuclear power generation cost forecast is significantly lower than cost of energy from fossil fuels. Such factors offer a new view on source of ''clean and safe'' nuclear energy.

  5. Cost Analysis of Plug-In Hybred Electric Vehicles Using GPS-Based Longitudinal Travel Data

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Xing [Lamar University; Dong, Jing [Iowa State University; Lin, Zhenhong [ORNL

    2014-01-01

    Using spatial, longitudinal travel data of 415 vehicles over 3 18 months in the Seattle metropolitan area, this paper estimates the operating costs of plug-in hybrid electric vehicles (PHEVs) of various electric ranges (10, 20, 30, and 40 miles) for 3, 5, and 10 years of payback period, considering different charging infrastructure deployment levels and gasoline prices. Some key findings were made. (1) PHEVs could help save around 60% or 40% in energy costs, compared with conventional gasoline vehicles (CGVs) or hybrid electric vehicles (HEVs), respectively. However, for motorists whose daily vehicle miles traveled (DVMT) is significant, HEVs may be even a better choice than PHEV40s, particularly in areas that lack a public charging infrastructure. (2) The incremental battery cost of large-battery PHEVs is difficult to justify based on the incremental savings of PHEVs operating costs unless a subsidy is offered for largebattery PHEVs. (3) When the price of gasoline increases from $4/gallon to $5/gallon, the number of drivers who benefit from a larger battery increases significantly. (4) Although quick chargers can reduce charging time, they contribute little to energy cost savings for PHEVs, as opposed to Level-II chargers.

  6. Economic costs of electrical system instability and power outages caused by snakes on the Island of Guam

    Science.gov (United States)

    Fritts, T.H.

    2002-01-01

    The Brown Tree Snake, Boiga irregularis, is an introduced species on Guam where it causes frequent electrical power outages. The snake's high abundance, its propensity for climbing, and use of disturbed habitats all contribute to interruption of Guam's electrical service and the activities that depend on electrical power. Snakes have caused more than 1600 power outages in the 20-yr period of 1978–1997 and most recently nearly 200 outages per year. Single outages spanning the entire island and lasting 8 or more hours are estimated to cost in excess of $3,000,000 in lost productivity, but the costs of outages that involve only parts of the island or those of shorter durations are more difficult to quantify. Costs to the island's economy have exceeded $4.5 M $4.5M"> per year over a 7-yr period without considering repair costs, damage to electrical equipment, and lost revenues. Snakes pose the greatest problem on high voltage transmission lines, on transformers, and inside electrical substations.

  7. Cost efficiency and optimal scale of electricity distribution firms in Taiwan: An application of metafrontier analysis

    International Nuclear Information System (INIS)

    Huang, Y.-J.; Chen, K.-H.; Yang, C.-H.

    2010-01-01

    This paper analyzes the cost efficiency and optimal scale of Taiwan's electricity distribution industry. Due to the substantial difference in network density, firms may differ widely in production technology. We employ the stochastic metafrontier approach to estimate the cost efficiency of 24 distribution units during the period 1997-2002. Empirical results find that the average cost efficiency is overestimated using the traditional stochastic frontier model, especially for low density regions. The average cost efficiency of the high density group is significantly higher than that of the low density group as it benefits from network economies. This study also calculates both short-term and long-term optimal scales of electricity distribution firms, lending policy implications for the deregulation of the electricity distribution industry.

  8. Trends in transmission, distribution, and administration costs for U.S. investor-owned electric utilities

    International Nuclear Information System (INIS)

    Fares, Robert L.; King, Carey W.

    2017-01-01

    This paper analyzes the cost of transmission, distribution, and administration for U.S. investor-owned electric utilities. We analyze data reported to the Federal Energy Regulatory Commission (FERC) from 1994 to 2014 using linear regression to understand how the number of customers in a utility's territory, annual peak demand, and annual energy sales affect annual TD&A spending. Then, we use Edison Electric Institute data for 1960 to 1992 to show trends in TD&A spending between 1960 and 2014. We find that the number of customers in a utility's territory is the single best predictor for annual TD&A costs. Between 1994 and 2014, the average cost per customer was $119/Customer-Year for transmission, $291/Customer-Year for distribution, and $333/Customer-Year for utility administration. Total TD&A costs per customer have been approximately $700–$800/Customer-Year since 1960, but the cost per kWh of energy sold was significantly higher in the 1960s because the average customer used less than half as much energy annually versus 2014. Thus, TD&A costs per kWh are likely to increase if kWh energy sales decline in the future unless cost recovery is transitioned to a mechanism not based solely on kWh sales. - Highlights: • U.S. investor-owned electric utility delivery costs from 1960? 2014 are investigated. • Transmission, distribution, and utility administrative costs are analyzed separately. • The number of utility customers is the best predictor for annual delivery costs. • Delivery costs per kWh are likely to increase if kWh sales decrease in the future.

  9. 46 CFR 111.20-5 - Temperature rise.

    Science.gov (United States)

    2010-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-5 Temperature rise. (a) The... than 40 degrees C, the transformer must be derated so that the total temperature stated in this section...

  10. The cost of electricity distribution in Italy: a quantitative analysis

    International Nuclear Information System (INIS)

    Scarpa, C.

    1998-01-01

    This paper presents a quantitative analysis of the cost of medium and low tension electricity distribution in Italy. An econometric analysis of the cost function is proposed, on the basis of data on 147 zones of the dominant firm, ENEL. Data are available only for 1996, which has forced to carry out only a cross-section OLS analysis. The econometric estimate shows the existence of significant scale economies, that the current organisational structure does not exploit. On this basis is also possible to control to what extent exogenous cost drivers affect costs. The role of numerous exogenous factors considered seems however quite limited. The area of the distribution zone and an indicator of quality are the only elements that appear significant from an economic viewpoint [it

  11. Revisiting CO2 mitigation potential and costs in China's electricity sector

    International Nuclear Information System (INIS)

    Cai Wenjia; Wang Can; Chen Jining

    2010-01-01

    To improve the reliability of sectoral mitigation potential and cost analysis, this paper made an in-depth exploration into China's electricity sector's thermal efficiency and inner structure. It is found that unlike what many literatures portray, China is actually among the world's leaders in coal-fired power plants' generating efficiencies; besides, although there are still numerous small and inefficient generating units in the current generation fleet, many of them are in fact playing important roles in supporting local economic development, meeting peak load needs, balancing heat and electricity supply and providing job opportunities to the local economy, therefore their existence does not necessarily mean low-cost mitigation potential. Given the efficiency and structural characteristics of China's electricity sector, it is pointed out that some other mitigation options, such as demand side management, IGCC and renewable energy as well as the break-through of CCS technology may play an even more important role in emission reduction. Considering the significant lock-in effects in electricity sector, it is warned that China, if continues putting majority investment in large and advanced coal-fired generating units, will face another round of chasing-after for the new and advanced renewable generation technologies. Therefore China should put more efforts in renewable generation technologies now.

  12. The policy implications of the different interpretations of the cost-effectiveness of renewable electricity support

    International Nuclear Information System (INIS)

    Río, Pablo del; Cerdá, Emilio

    2014-01-01

    The cost-effectiveness of support for renewable electricity is a main criterion to assess the success of policy instruments, together with effectiveness. The costs of support are also a source of significant concern for governments all over the world. However, significant confusion exists in the literature on the cost-effectiveness of public support for renewable electricity. While some authors define the concept of cost-effectiveness as that which complies with the equimarginality principle, many others, including documents from relevant organisations (European Commission, International Energy Agency, Intergovernmental Panel on Climate Change) define it as “the lowest costs of support”, generally equating it with the minimisation of consumer costs. The aim of this paper is to clarify the differences between both approaches and their policy implications regarding the choice of instruments and design elements. It is shown that they partly overlap and that their policy implications clearly differ, leading to very different policy prescriptions. While the former favours technology neutral instruments and design elements, the “minimisation of consumer costs” approach favours instruments and design elements which adjust support levels to the costs of the technologies. - Highlights: • Significant confusion exists in the literature on the cost-effectiveness of public support for renewable electricity. • Clarify the differences between two main approaches to cost-effectiveness. • Policy implications clearly differ, leading to very different policy prescriptions

  13. Modeling Future Life-Cycle Greenhouse Gas Emissions and Environmental Impacts of Electricity Supplies in Brazil

    Directory of Open Access Journals (Sweden)

    Melissa M. Bilec

    2013-07-01

    Full Text Available Brazil’s status as a rapidly developing country is visible in its need for more energy, including electricity. While the current electricity generation mix is primarily hydropower based, high-quality dam sites are diminishing and diversification to other sources is likely. We combined life-cycle data for electricity production with scenarios developed using the IAEA’s MESSAGE model to examine environmental impacts of future electricity generation under a baseline case and four side cases, using a Monte-Carlo approach to incorporate uncertainty in power plant performance and LCA impacts. Our results show that, under the cost-optimal base case scenario, Brazil’s GHGs from electricity (excluding hydroelectric reservoir emissions rise 370% by 2040 relative to 2010, with the carbon intensity per MWh rising 100%. This rise would make Brazil’s carbon emissions targets difficult to meet without demand-side programs. Our results show a future electricity mix dominated by environmental tradeoffs in the use of large-scale renewables, questioning the use tropical hydropower and highlighting the need for additional work to assess and include ecosystem and social impacts, where information is currently sparse.

  14. The effect of costs and regulation on electricity prices

    International Nuclear Information System (INIS)

    Schlaf, E.P.

    1991-01-01

    Two distinct econometric tests were performed to determine if state price regulation of public utilities has had a measurable impact on retail electricity prices. The results of both tests agree that, during the 1971-1985 period, average national electricity prices in each of the three major consuming sectors and the four Census regions were below the level which would have been preferred by profit-maximizing monopolists. Electricity consumers received price benefits during the sample period as a result of regulation. The first test of the effectiveness of state price regulation used a 'revealed preference' approach by comparing the actual prices set by regulatory commissioners with prices and outcomes predicted by three competing theories of regulatory motivation. The second test of the effectiveness of price regulation combined traditional cost function inputs with regulatory variables in reduced-form price equations to determine whether the amount of regulatory intensity, as measured by the number of staff members per regulated utility, is associated with declining electricity prices and whether appointed commissioners allow higher prices than elected commissioners

  15. Survey costs associated with the replacement of electric showers for solar heaters

    International Nuclear Information System (INIS)

    Belchior, Fernando Nunes; Araujo, Jose Euripedes de

    2010-01-01

    This paper aims to explain the benefits of replacing electric shower for solar water heaters, and a consequent drop in peak demand for electric power generation and residential consumption in the economy. For this, will be shown the lifting of solar radiation per square meter in Brazil, studied in 250 locations, the most representative in terms of solar energy in this country. The costs presented are associated with replacement of 5 million, 10 million and 20 million electric showers. (author)

  16. Global long-term cost dynamics of offshore wind electricity generation

    NARCIS (Netherlands)

    Gernaat, David E H J; Van Vuuren, Detlef P.; Van Vliet, Jasper; Sullivan, Patrick; Arent, Douglas J.

    2014-01-01

    Using the IMAGE/TIMER (The Targets IMage Energy Regional) long-term integrated assessment model, this paper explores the regional and global potential of offshore wind to contribute to global electricity production. We develop long-term cost supply curve for offshore wind, a representation of the

  17. External costs of electricity production under scrutiny

    International Nuclear Information System (INIS)

    Wagner, H.J.; Melchert, A.

    1993-01-01

    After a short introduction into the problems and questions surrounding the issue of external costs Chapter 2 presents the most important results of the studies under review and analysis in this work. Occasionally, minor discrepancies were found between the results given in the summary of a study and the data reported in the relevant chapters. Chapter 3 identifies and discusses differences in perspective between the studies under consideration. Chapter 4 analyses the most important premises and parameters adopted in the studies for the calculation of overall costs and net benefits of the different modes of electricity production. This serves to probe the reliability of the data, plausibility of the premises, and nature of the presupposed relationships. Chapter 5 examines the relationships of time assumed in the studies and gives a first comment on the more advanced Prognos study. Chapter 6, finally, offers a summarizing evaluation. (orig./UA) [de

  18. Prices and costs of irregularity in renewable resources in the liberalized electricity markets

    International Nuclear Information System (INIS)

    Menanteau, Ph.; Finon, D.

    2004-01-01

    The problems raised by incorporating irregular production are of a technical nature (risk of non-availability during peak demand, the requirements for additional reserves) but the electricity markets methods of operation impose economic penalties, which greatly exceed these additional technical costs. In this document, the authors examine the nature of the technical problems posed by irregularity of production and the additional costs resulting from this, and then analyse the origins of the economic penalties that the operation of liberalized electricity markets impose, taking in particular the example of the British market, the New Energy Trading Arrangement (NETA). It would appear that the markets' operating rules may conflict, in certain cases, with the targets for promoting electricity generation from renewable resources. Two types of solutions can therefore be envisaged: a set of rules to limit the impact on irregular production or collective handling of the adjustment to production from renewable resources as already exists in the Nordic electricity markets. (authors)

  19. Impact of electric range and fossil fuel price level on the economics of plug-in hybrid vehicles and greenhouse gas abatement costs

    International Nuclear Information System (INIS)

    Özdemir, Enver Doruk; Hartmann, Niklas

    2012-01-01

    In this paper, the energy consumption shares of plug-in hybrid vehicles (PHEVs) for electricity from the grid and conventional fuel depending on electric driving range are estimated. The resulting mobility costs and greenhouse gas (GHG) abatement costs per vehicle kilometer for the year 2030 are calculated and optimal electric driving range (which indicates the size of the battery) is found for different oil price levels with the help of a MATLAB based model for a typical compact passenger car (e.g. VW Golf). The results show that the optimum electric driving range for minimum mobility costs of a PHEV is between 12 and 32 km. Furthermore, optimum GHG abatement costs are achieved with an electric driving range between 16 and 23 km. These results are considerable lower than most market ready PHEVs (electric driving range of 50 to 100 km), which shows that the automobile industry should concentrate on shorter electric driving range for PHEVs in the near future to offer cost optimum mobility and low GHG abatement costs. However, the oil price level and the consumer driving habits impact heavily on the cost performance as well as the optimum electric driving range of plug-in hybrid vehicles. - Highlights: ► We analyze the energy consumption (and share of grid electricity) of plug-in hybrid vehicles. ► We analyzed the mobility costs and GHG abatement costs depending on electric driving range. ► Mobility costs of plug-in hybrid vehicles can be lower than those of conventional diesel vehicles in 2030. ► The optimum mobility costs are achieved with the electric driving range between 12 and 32 km. ► The optimum GHG abatement costs are achieved with the electric driving range between 16 and 23 km.

  20. Rising labor costs, earnings management, and financial performance of health care providers around the world.

    Science.gov (United States)

    Dong, Gang Nathan

    2015-01-01

    Amid increasing interest in how government regulation and market competition affect the cost and financial sustainability in health care sector, it remains unclear whether health care providers behave similarly to their counterparts in other industries. The goal of this chapter is to study the degree to which health care providers manipulate accruals in periods of financial difficulties caused, in part, by the rising costs of labor. We collected the financial information of health care provider in 43 countries from 1984 to 2013 and conducted a pooled cross-sectional study with country and year fixed-effects. The empirical evidence shows that health care providers with higher wage costs are more likely to smooth their earnings in order to maintain financial sustainability. The finding of this study not only informs regulators that earnings management is pervasive in health care organizations around the world, but also contributes to the studies of financial booktax reporting alignment, given the existing empirical evidence linking earnings management to corporate tax avoidance in this very sector.

  1. Projected costs of nuclear and conventional base load electricity generation in some IAEA Member States

    International Nuclear Information System (INIS)

    1990-09-01

    The cost of nuclear and conventional electricity is one of the most important parameters for power system planning, and in particular for decisions on base load power projects. This study reviews the projected levelized electricity generation costs of the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained and evaluated for nuclear and fossil fuelled (mainly coal-fired) plants that could be commissioned in the mid- to late 1990s in 10 IAEA Member States. 27 refs, figs and tabs

  2. Estimates of the cost and energy consumption of aluminum-air electric vehicles

    Science.gov (United States)

    Cooper, J. F.

    1980-11-01

    Economic costs and primary energy consumption are estimated for general purpose electric vehicles using aluminum-air propulsion batteries within the time frame of the 1990's (earliest possible date of introduction). For an aluminum-air fuel economy of 36 tonne/km/kg-Al (optimized low-gallium alloys), a total refueling cost of 5.6 cents/km (1979$) was estimated for a 1.27 tonne vehicle. This is equivalent to $2 to 3/gal for automobiles of the same weight with fuel economies of 13.5 to 19.3 tonne-km/liter. The total primary energy consumption was estimated to be 1.3 to 1.7 kWh/km (coal) for the electric vehicle, which corresponds roughly to the energy cost of the automobiles using liquid fuels synthesized from coal. The energy consumption is 30 to 70 percent greater than the reference automobile using petroleum-derived gasoline.

  3. Strategies to address transition costs in a restructuring electricity industry

    International Nuclear Information System (INIS)

    Baxter, Lester; Hirst, Eric; Hadley, Stanton

    1997-01-01

    This paper discusses the potential financial consequences, or transition costs, of transforming electricity generation from a regulated to a competitive market in the US. Industry-wide estimates suggest potential monetary losses could exceed $100 billion as a result of the move to competition. The paper discusses the most prominent strategies suggested to address these potential losses. For each strategy, the paper identifies the parties most likely to bear the financial consequences. Most strategies do nothing to reduce the total costs to society, but instead shift costs from one set of economic actors to another. The exceptions are those strategies that result in economic-efficiency gains, which can then be used to offset the transition costs. Most of the strategies examined require the cooperation of several parties, including regulators, to be implemented successfully. (author)

  4. Hybrid 21 MW wind-solar system to limit energy costs at an industrial plant; Sistema híbrido eólico-solar de 21 MW para contención del coste energético en una planta industrial

    Energy Technology Data Exchange (ETDEWEB)

    López, C.

    2016-07-01

    Ereda has undertaken a project that aims to analyse the possibility of limiting the cost of the energy supply to a medium-sized industrial plant, with an installed capacity of over 26 MW, located in the south-west of Kazakhstan. The cost of electricity for its processes accounts for an important part of its production cost, achieving values in excess of 40%. The price of electricity in the country is expected to rise over the coming years. In addition, the plant is now required to reduce CO2 emissions from its industrial activity, which is why a further cost arising from the acquisition of emissions rights is expected in future. (Author)

  5. Cost Effectiveness Analysis of Quasi-Static Wireless Power Transfer for Plug-In Hybrid Electric Transit Buses: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Lijuan; Gonder, Jeff; Burton, Evan; Brooker, Aaron; Meintz, Andrew; Konan, Arnaud

    2015-11-11

    This study evaluates the costs and benefits associated with the use of a plug-in hybrid electric bus and determines the cost effectiveness relative to a conventional bus and a hybrid electric bus. A sensitivity sweep analysis was performed over a number of a different battery sizes, charging powers, and charging stations. The net present value was calculated for each vehicle design and provided the basis for the design evaluation. In all cases, given present day economic assumptions, the conventional bus achieved the lowest net present value while the optimal plug-in hybrid electric bus scenario reached lower lifetime costs than the hybrid electric bus. The study also performed parameter sensitivity analysis under low market potential assumptions and high market potential assumptions. The net present value of plug-in hybrid electric bus is close to that of conventional bus.

  6. Integrated Cost Allocation of Transmission Usage under Electricity Markets

    Directory of Open Access Journals (Sweden)

    Hermagasantos Zein

    2012-08-01

    Full Text Available Cost allocation of transmission usage on the power networks is an important issue especially in the modern electricity market mechanism. In this context, all costs that have been embedded in the transmission, embedded cost, should be covered by the transmission users. This paper follows general methods, where generators are fullyresponsible to cover the embedded cost. It proposes a method to determine the cost allocation of transmission usage based on decomposition through the superposition techinique to determine power flow contributions from an integrated base case of the results of the power flow calculations of all transactions, bilateral and nonbilateral contracts. Mathematically, the applied formulations are illustrated clearly in this paper. The proposed method has been tested with 5-bus system and the results are much different compared to a few of the published methods. This is shown by the test results on the 5 bus system. The published methods produce total power flow contributions in each line is greater than the actual. And they earn total revenues approximately 11.6% greater than the embedded cost. While on the proposed method, the power flow contribu tions are equal to the actual and the revenues are equal to the embedded cost. It shows also that the proposed method gives results as expected.

  7. The external costs of electricity generation: a comparison of generation technologies

    Energy Technology Data Exchange (ETDEWEB)

    Ozdemiroglu, E [Economics for the Environment Consultancy, London (United Kingdom)

    1995-12-01

    Electricity generation, like any economic activity, leads to costs that can be grouped in two categories: (a) private or internal and (b) external. Private costs are those paid by the buyers and sellers of energy within the market system. The external costs, however, are not included in the market price mechanism as they accrue to third parties other than the buyer and the seller. External costs include environmental external costs and non-environmental external costs. There are two conditions for the existence of external costs: (a) market failure, or the inability of markets to account for the cost of environmental impacts of energy generation and the market structure and (b) government or policy failure, or the policies that cause private generators to pay either higher or lower costs than they would if these interventions did not exist. A third reason can be added for the existence of non-environmental externalities: energy security, or certain costs faced by society as a result of over-reliance on imported energy. Section A introduces the concept of external costs and benefits. Section B looks at the environmental externalities of energy generation. The procedure is to develop the methodology to estimate what are known as externality adders, i.e. a monetary value for the environmental costs and benefits associated with selected generation technologies, expressed in pence per kilowatt-hour. The result is an `adder` because, in principle, the sum can be added to the private cost of generating electricity to obtain a measure of the `full` or `social` cost. The selected generation technologies are conventional coal, wind power, small-scale hydro, energy crops, incineration of municipal solid waste and energy recovery from landfill. The data reported are based on the application of the technologies in Scotland, but the methodology can be applied anywhere. Section C takes a brief look at the non-environmental externalities including the general theory and evidence

  8. The external costs of electricity generation: a comparison of generation technologies

    International Nuclear Information System (INIS)

    Ozdemiroglu, E.

    1995-01-01

    Electricity generation, like any economic activity, leads to costs that can be grouped in two categories: (a) private or internal and (b) external. Private costs are those paid by the buyers and sellers of energy within the market system. The external costs, however, are not included in the market price mechanism as they accrue to third parties other than the buyer and the seller. External costs include environmental external costs and non-environmental external costs. There are two conditions for the existence of external costs: (a) market failure, or the inability of markets to account for the cost of environmental impacts of energy generation and the market structure and (b) government or policy failure, or the policies that cause private generators to pay either higher or lower costs than they would if these interventions did not exist. A third reason can be added for the existence of non-environmental externalities: energy security, or certain costs faced by society as a result of over-reliance on imported energy. Section A introduces the concept of external costs and benefits. Section B looks at the environmental externalities of energy generation. The procedure is to develop the methodology to estimate what are known as externality adders, i.e. a monetary value for the environmental costs and benefits associated with selected generation technologies, expressed in pence per kilowatt-hour. The result is an 'adder' because, in principle, the sum can be added to the private cost of generating electricity to obtain a measure of the 'full' or 'social' cost. The selected generation technologies are conventional coal, wind power, small-scale hydro, energy crops, incineration of municipal solid waste and energy recovery from landfill. The data reported are based on the application of the technologies in Scotland, but the methodology can be applied anywhere. Section C takes a brief look at the non-environmental externalities including the general theory and evidence

  9. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    International Nuclear Information System (INIS)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options

  10. Least cost analysis of Belarus electricity generation system with focus on nuclear option

    International Nuclear Information System (INIS)

    Mikhalevich, A.; Yakushau, A.

    2004-01-01

    A basic feature of the Belarus electricity system is that about 50% of the installed power capacity is used to produce heat for the central heating supply system. The Republic has one of the most developed districts heating system in Europe. The installation started in 1930, and developed very fast after 1945. Co-generation of electricity and thermal energy in central power plants has played a fundamental role in the local economy. Presently, Belarus electricity generation system includes: Total installed capacities of condensing turbines 3665 MW; Total installed capacities of co-generation turbines 3889 MW. It is expected that in 2020 in accordance with electricity demand forecast peak load demand will be equaled approximately 9500 MW. Taking into account that operation time of 60 % existent co-generation turbine and 70 % of condensing turbine can be extended up to 2020 during the period 2005 - 2020 it is necessity to install about 1500 MW of new co-generation units and about 2000 MW of condensing turbines. To select the least cost scenario for electricity generation system expansion improved computer code WASP-IV for Windows had been used. As far code WASP-IV do not allow finding out optimal solution for electricity generation system with high share of co-generation directly the methodology of application of this program for this case had been developed. Methodology is based on utilization of code WASP-IV for simulation condensing turbines and module BALANCE for modeling co-generation part of the system. The scenarios for the electricity system expansion plan included only conventional technologies. Presently, the works connected with the preparedness for NPP construction in the Republic including site survey for NPP are being carried out. The first stage of siting process according to the IAEA classification has been completed. It was based on a set of criteria answered to A Safety Guide of the IAEA Site Survey for Nuclear Power Plants and requirements to be

  11. Electrification Futures Study: End-Use Electric Technology Cost and Performance Projections through 2050

    Energy Technology Data Exchange (ETDEWEB)

    Vimmerstedt, Laura J. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jadun, Paige [National Renewable Energy Lab. (NREL), Golden, CO (United States); McMillan, Colin A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Steinberg, Daniel C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Muratori, Matteo [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu T. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2018-01-02

    This report provides projected cost and performance assumptions for electric technologies considered in the Electrification Futures Study, a detailed and comprehensive analysis of the effects of widespread electrification of end-use service demands in all major economic sectors - transportation, residential and commercial buildings, and industry - for the contiguous United States through 2050. Using extensive literature searches and expert assessment, the authors identify slow, moderate, and rapid technology advancement sensitivities on technology cost and performance, and they offer a comparative analysis of levelized cost metrics as a reference indicator of total costs. The identification and characterization of these end-use service demand technologies is fundamental to the Electrification Futures Study. This report, the larger Electrification Futures Study, and the associated data and methodologies may be useful to planners and analysts in evaluating the potential role of electrification in an uncertain future. The report could be broadly applicable for other analysts and researchers who wish to assess electrification and electric technologies.

  12. A Canadian case study : the value of real time electricity monitoring : a real-time cost utility management solution

    International Nuclear Information System (INIS)

    Rouse, S.; Dittburner, D.

    2006-01-01

    Energy prices can vary significantly over the course of a single day in response to changing levels in energy demand and availability of supply. The impacts of varying energy prices on business and industry means that hourly electricity costs can fluctuate widely over the course of a day even though energy use remains stable. This presentation gave details of an energy efficiency initiative at Unilever's Rexdale site which has resulted in $4 million saved through reductions in energy consumption and equipment retrofits. The Rexdale plant won an energy efficiency award in 2005, and the success of the initiative was attributed to the use of Utility 3 + , an energy management software tool. A turn key system with integrated software and hardware, Utility 3 + is capable of measuring how much energy is being used and can provide details of costs using a combination of historical and forecast prices. The tool is equipped with alarms with pre-set thresholds to match real-time rises in energy prices. Real-time prices are relayed from the Internet along with a 2 way data communication system. It was concluded that use of the tool has resulted in improved cash flow management and greater control of energy costs. A system description of the tool was provided, as well as details of various equipment retrofits. refs.., tabs., figs

  13. A Canadian case study : the value of real time electricity monitoring : a real-time cost utility management solution

    Energy Technology Data Exchange (ETDEWEB)

    Rouse, S. [Energy at Work, Toronto, ON (Canada); Dittburner, D. [Unilever Canada, Toronto, ON (Canada)

    2006-07-01

    Energy prices can vary significantly over the course of a single day in response to changing levels in energy demand and availability of supply. The impacts of varying energy prices on business and industry means that hourly electricity costs can fluctuate widely over the course of a day even though energy use remains stable. This presentation gave details of an energy efficiency initiative at Unilever's Rexdale site which has resulted in $4 million saved through reductions in energy consumption and equipment retrofits. The Rexdale plant won an energy efficiency award in 2005, and the success of the initiative was attributed to the use of Utility 3{sup +}, an energy management software tool. A turn key system with integrated software and hardware, Utility 3{sup +} is capable of measuring how much energy is being used and can provide details of costs using a combination of historical and forecast prices. The tool is equipped with alarms with pre-set thresholds to match real-time rises in energy prices. Real-time prices are relayed from the Internet along with a 2 way data communication system. It was concluded that use of the tool has resulted in improved cash flow management and greater control of energy costs. A system description of the tool was provided, as well as details of various equipment retrofits. refs.., tabs., figs.

  14. Renewable electricity production costs-A framework to assist policy-makers' decisions on price support

    International Nuclear Information System (INIS)

    Dinica, Valentina

    2011-01-01

    Despite recent progress, the production costs for renewable electricity remain above those for conventional power. Expectations of continuous reductions in production costs, typically underpin governments' policies for financial support. They often draw on the technology-focused versions of the Experience Curve model. This paper discusses how national-contextual factors also have a strong influence on production costs, such as geographic, infrastructural, institutional, and resource factors. As technologies mature, and as they reach significant levels of diffusion nationally, sustained increases in production costs might be recorded, due to these nationally contextual factors, poorly accounted for in policy-making decisions for price support. The paper suggests an analytical framework for a more comprehensive understanding of production costs. Based on this, it recommends that the evolution of specific cost levels and factors be monitored to locate 'sources of changes'. The paper also suggests policy instruments that governments may use to facilitate cost decreases, whenever possible. The application of the framework is illustrated for the diffusion of wind power in Spain during the past three decades. - Highlights: → Models, frameworks for policy-making on price support for renewable electricity production costs. → Policy instruments to help reduce production costs. → Limits to the influence of policies of production costs reductions.

  15. Regional differences in electricity distribution costs and their consequences for yardstick regulation of access prices

    International Nuclear Information System (INIS)

    Filippini, M.; Wild, J.

    2001-01-01

    In this paper we estimate an average-cost function for a panel of 59 Swiss local and regional electricity distribution utilities as a basis for yardstick regulation of the distribution-network access prices. Shleifer (1985) proposed yardstick competition in terms of price to regulate local monopolies producing a homogeneous good. The regulated price for the individual firms depends on the average costs of identical firms. The yardstick competition concept can also be applied to firms that produce heterogeneous goods if these goods differ only in observable characteristics. To correct the yardstick for heterogeneity the regulator can use a multivariate estimation of an average-cost function. In the case of electricity distribution, the heterogeneity of output consists mainly of different characteristics of the distribution service areas. In this paper we follow Shleifer's suggestion to estimate a multivariate average-cost function that can be employed by the regulatory commission to benchmark network access prices at the distribution level. Several exogenous variables measuring the heterogeneity of the service areas were included in the cost model specification. We find that the regional differences of the service areas - e.g. area shares of forests, agricultural areas or unproductive land and population density - significantly influence electricity distribution costs

  16. Too costly to matter: Economics of nuclear power for Saudi Arabia

    International Nuclear Information System (INIS)

    Ahmad, Ali; Ramana, M.V.

    2014-01-01

    Saudi Arabia has ambitious plans for nuclear power. Given this context, this paper examines the economics of nuclear power and compares it to two other sources of electricity, natural gas and solar energy. It calculates the costs of electricity generation, water desalination and the opportunity cost associated with forgone oil and gas revenues. A sensitivity analysis is included to account for variations in important parameters within the comparative cost analysis. Our results suggest that for a large range of parameters, the economics of nuclear power are not favorable in comparison with natural gas, even if the currently low domestic natural gas prices in Saudi Arabia were to rise substantially. Further, electricity from solar plants has the potential to be cheaper than nuclear power within the next decade if the rapid decline in solar energy costs in the last decade continue, i.e., before the first planned nuclear power plant would be completed. However, unless the price of oil drops substantially below current values, it would be more economically optimal to export the oil than using it for generating electricity. - Highlights: • Future projections show nuclear power is not cost effective for Saudi Arabia. • A combination of solar and natural gas could largely meet future electricity demand. • There are multiple, non-economic, motivations for Saudi Arabia's nuclear program. • Saudi Arabia would economically benefit by not using oil for electricity generation

  17. Electricity generation from renewable energy sources in Italy: the costs of the System Inefficiencies

    International Nuclear Information System (INIS)

    Bano, L.; Lorenzoni, A.

    2008-01-01

    The promotion of electricity from renewable energy sources (RES) is a high European Union (E U) priority for several reasons, including the security and diversification of energy supply, environmental protection and social and economic cohesion. The Eu Council's decision of 9 March 2007 points towards increasing renewable penetration to 20% of total primary energy supply by 2020 (binding target). There are both costs and benefits associated with the achievement of such an ambitious target. For renewable technologies, the industrial cost is often higher compared to other energy sources. however, due to learning curve effects and market diffusion, technology related costs are coming down considerably. In some cases, when the external costs are taken into account by the price system, renewable can now be close to competitive with fossil fuels. With particular reference to renewable electricity in Italy, its development is often hampered by burdensome and time consuming authorisation procedures with the consequence of a high mortality rate for the investments in the sector, leading to increased costs for the project management. Therefore, in these projects an important cost factor is the high cost of capital due to risk. The analysis of the various renewables' support mechanisms currently in place in the E U shows that some types of incentive have proven to be more efficient than others in reducing the risk perception of investors and financing institutions, therefore making projects less expensive by reducing the cost of capital (both debt and equity). Therefore the focus here is on the electricity generation costs of some renewable technologies and on the costs related to the additional risk perceived by investors/lenders in the sector. The authors estimate the additional cost of capital which investors pay when operating in a risky environment. Some policy indications are finally given to reduce the non-technology related costs for a faster and more efficient growth

  18. Nuclear operating costs are rising exponentially - official

    International Nuclear Information System (INIS)

    Thomas, S.

    1988-01-01

    The Energy Information Agency of the United States Department of Energy has collected data on the operations of nuclear power plants in the United States. A statistical regression analysis was made of this data base. This shows that the escalation in annual, real non-fuel operating costs is such that the operating cost savings made by closing down an old nuclear plant would be sufficient to pay the capital and operating costs of replacing it with a brand new coal-fired plant. The main reason for the increasing operating and maintenance costs is the cost of replacement power i.e. the higher the economic penalty of plant breakdown the more the utility has to spend on maintenance. Another reason is time -not the age of the plant - but the year the data was collected. The economic case for nuclear power is seriously challenged. (U.K.)

  19. The impact of ownership unbundling on cost efficiency: Empirical evidence from the New Zealand electricity distribution sector

    International Nuclear Information System (INIS)

    Filippini, Massimo; Wetzel, Heike

    2014-01-01

    Several countries around the world have introduced reforms to the electric power sector. One important element of these reforms is the introduction of an unbundling process, i.e., the separation of the competitive activities of supply and production from the monopole activity of transmission and distribution of electricity. There are several forms of unbundling: functional, legal and ownership. New Zealand, for instance, adopted an ownership unbundling in 1998. As discussed in the literature, ownership unbundling produces benefits and costs. One of the benefits may be an improvement in the level of the productive efficiency of the companies due to the use of the inputs in just one activity and a greater level of transparency for the regulator. This paper analyzes the cost efficiency of 28 electricity distribution companies in New Zealand for the period between 1996 and 2011. Using a stochastic frontier panel data model, a total cost function and a variable cost function are estimated in order to evaluate the impact of ownership unbundling on the level of cost efficiency. The results indicate that ownership separation of electricity generation and retail operations from the distribution network has a positive effect on the cost efficiency of distribution companies in New Zealand. The estimated effect of ownership separation suggests a positive average one-off shift in the level of cost efficiency by 0.242 in the short-run and 0.144 in the long-run. - Highlights: • We analyze the impact of ownership unbundling on the level of cost efficiency. • A variable cost frontier function and a total cost frontier function are estimated. • The results suggest a positive one-off shift in the level of cost efficiency

  20. Quantity Surveying Undergraduates’ Awareness on Cost Significant of High-Rise Condominium Projects in Malaysia: The Case of a Private University in Malaysia

    OpenAIRE

    Peng Lee Wah; Seng Ng See; Choon Toh Tien; Sim Lim Cheng; Khian Yong Ching; Chen Goh Kai

    2016-01-01

    Recent developments in quantity surveying (QS) emphasised the importance of identifying cost significant elements (CSE). The knowledge on CSE of high-rise condominium projects (HRCP) is essential as high-rise residential multi-unit projects are the next option in building construction due to limited land areas in urban areas. This study aims to determine the levels of awareness among QS undergraduates of a private university in Malaysia on CSE of HRCP in Malaysia. The respondents’ knowledge o...

  1. Marginal cost pricing for coal fired electricity in coastal cities of China: the case of Mawan Electricity Plant in Shenzhen City, China.

    Science.gov (United States)

    Zhang, Shi-Qiu; Duan, Yan-Xin

    2003-05-01

    By developing a GDMOD model to estimate the environmental externalities associated with electricity generation, this project provides a detailed analysis of the damages and costs caused by different pollutants at varying distances from the Mawan Electricity Plant in Shenzhen, China. The major findings of this study can be summarized that (1) environmental damages caused by electricity production are large and are mainly imposed on regions far away from the electricity plant; (2) air pollution is the most significant contributor to the total damages, and SO2, NO(x), and particulate matter are the three major pollutants with highest damages; (3) the damages caused per unit of particulate,NO(x), and SO2 emissions are much higher than pollution treatment and prevention costs. The research results of this project showed that China needs to have a more effective levy system on SO2, and a more manageable electricity tariff mechanism to internalize the environmental externalities. The results have also implications for pollution control strategies, compensation schemes as well an emission trading arrangements.

  2. Cost modelling of electricity-producing hot dry rock (HDR) geothermal systems in the United Kingdom

    International Nuclear Information System (INIS)

    Doherty, P.; Harrison, R.

    1995-01-01

    A detailed and comprehensive cost model for Hot Dry Rock (HDR) electricity producing systems has been developed in this study. The model takes account of the major aspects of the HDR system, parameterized in terms of the main physical and cost parameters of the resource and the utilization system. A doublet configuration is assumed, and the conceptual HDR system which is defined in the study is based upon the UK Department of Energy (DEn) HDR geothermal R and D programme. The model has been used to calculate the costs of HDR electricity for a UK defined base case which represents a consensus view of what might be achieved in Cornwall in the long term. At 14.2 p/kWh (1988 costs) this cost appears to be unacceptably high. A wide-ranging sensitivity study has also been carried out on the main resource, geometrical, and operational parameters of the HDR system centred around the UK base case. The sensitivity study shows the most important parameters to be thermal gradient and depth. The geometrical arrangement and the shape of the reservoir constitute major uncertainties in HDR systems. Their effect on temperature has a major influence on system performance, and therefore a range of theoretically possible geometries have been studied and the importance of geometrical effects on HDR electricity costs assessed. The most cost effective HDR arrangement in terms of optimized volumes and flow rates has been investigated for a world-wide range of thermal settings. The main conclusions from this study suggests that for HDR electricity to be economic, thermal gradients of 55 o C/km and above, well depths of 5 km or less, and production fluid temperatures of 210 o C and above are required. (UK)

  3. The impact of wind generation on the electricity spot-market price level and variance: The Texas experience

    International Nuclear Information System (INIS)

    Woo, C.K.; Horowitz, I.; Moore, J.; Pacheco, A.

    2011-01-01

    The literature on renewable energy suggests that an increase in intermittent wind generation would reduce the spot electricity market price by displacing high fuel-cost marginal generation. Taking advantage of a large file of Texas-based 15-min data, we show that while rising wind generation does indeed tend to reduce the level of spot prices, it is also likely to enlarge the spot-price variance. The key policy implication is that increasing use of price risk management should accompany expanded deployment of wind generation. - Highlights: → Rising wind generation in ERCOT tends to reduce electricity spot prices. → Rising wind generation in ERCOT is also likely to enlarge the spot-price variance. → Increased price risk management should accompany expanded wind power deployment.

  4. The electrical connection of offshore windparks - technology and investment costs

    International Nuclear Information System (INIS)

    Busch, R.; Schultz, W.; Unger, C.; Diedrichs, V.

    1996-01-01

    In order to reach an acceptable cost level for wind energy generated in off-shore wind farms, the consideration of the electrical grid connection is much more important than for on-shore sites. This connection was investigated under technical as well as financial aspects leading to different concepts for different sizes of windfarms. (Author)

  5. The impact of heat waves on electricity spot markets

    International Nuclear Information System (INIS)

    Pechan, Anna; Eisenack, Klaus

    2014-01-01

    Thermoelectric power plants depend on cooling water drawn from water bodies. Low river run-off and/or high water temperatures limit a plant's production capacity. This problem may intensify with climate change. Our study quantifies the impact of forced capacity reductions on market prices, production costs, consumer and producer surplus, as well as emissions by means of a bottom-up power generation system model. First, we simulate the German electricity spot market during the heat wave of 2006. Then we conduct a sensitivity study that accounts for future climatic and technological conditions. We find an average price increase of 11% during the heat wave 2006, which is even more pronounced during times of peak demand. Production costs accumulate to an additional but moderate 16 m. Due to the price increase, producers gain from the heat wave, whereas consumers disproportionately bear the costs. Carbon emissions in the German electricity sector increase during the heat wave. The price and cost effects are more pronounced and increase significantly if assumptions on heat-sensitive demand, hydropower capacity, net exports, and capacity reductions are tightened. These are potential additional effects of climate change. Hence, if mitigation fails or is postponed globally, the impacts on the current energy system are very likely to rise. Increases in feed-in from renewable resources and demand-side management can counter the effects to a considerable degree. Countries with a shift toward a renewable energy supply can be expected to be much less susceptible to cooling water scarcity than those with a high share of nuclear and coal-fired power plants. - Highlights: • We quantify the impact of thermal capacity reductions on the electricity market. • German heat wave 2006 caused moderate rise in production costs. • Capacity reductions have substantial impact on prices and raise producer surplus. • Impacts on prices, production cost and surplus amplify under climate

  6. Swinging boys to take over the E-world. The role of engineers in a liberalized electricity sector

    International Nuclear Information System (INIS)

    Schrauwers, A.

    2000-01-01

    The relatively reliable but also static electricity sector will in a few years change into a free market sector, including market shares, electricity exchanges and the inevitable rise of swinging persons. The market will regulate it all, but at the cost of what? An overview is given of the consequences of the liberalization process of the energy market in Europe

  7. Wind pumps for agriculture: Cost and environmental benefits (comparisons with electric and combustion engine driven pumps)

    International Nuclear Information System (INIS)

    Piccoli, F.

    1991-01-01

    After describing initial and running costs of a group of wind-pumps, the author calculates and compares, as far as agricultural and zootechnical purposes are concerned, the costs for each cubic meter of water extracted through wind-powered, electric and internal-combustion engines. The comparisons clearly show, under adequate wind conditions, that wind-pumps are economically more suitable than electric and motor pumps with similar delivery heads

  8. Bulgarian electricity market restructuring

    International Nuclear Information System (INIS)

    Ganev, Peter

    2009-01-01

    The energy sector in Bulgaria has undergone major restructuring in recent years. It faces the dual challenges of achieving regulatory stability to attract private investors, and creating a functioning competition energy market. As of the EU Accession in 2007, Bulgaria has fully liberalized power and gas markets. The 2003 Energy Law establishes the energy sector legal framework and sets the basis for creation of a transparent and predictable regulatory environment where the key regulatory responsibilities are vested with the State Energy and Water Regulatory Commission (SEWRC). The energy sector experienced significant problems in the first half of 2007 due to lost production capacities and regulatory failures on the electricity market. Excess price regulations on the market of electricity supplies to household, coupled with insufficient liberalization of imports and exports, create unfavorable conditions for power producers and large electricity users. The energy regulator has tried to achieve several incompatible targets as of July 1, 2007 for maintaining low electricity prices for households in response to political pressure, low power generation prices amid rising input costs, and market opening in compliance with EU regulations. (author)

  9. Cost estimation of sumatra electricity expansion planning with nuclear option

    International Nuclear Information System (INIS)

    Edwaren Liun

    2008-01-01

    The objective of the study is to obtain the cost analysis on optimum solution of Sumatra electricity system using WASP-IV Program. Considering the economic aspect, nuclear power plant (NPP) is feasible in the future. From the geographical aspect Sumatra is prospecting for NPP site, especially the east coastal area due to the absence of hydro power potential and geothermal field. The use of petroleum as fuel in large scale power plants is not feasible. Beside causing high cost for electricity sector, it is also an important fuel for any other sectors such as transportation, electrification of isolated areas. Gas fuelled power plants is still feasible for next several decades in limited capacity. The study presents three scenarios, i.e. Low Scenario, Base Scenario and High Scenario applying discount rate of 8%, 10% and 12% respectively. Cost estimation for Sumatra System Expansion Planning is 57 465 million US$ on the Base Scenario - discount rate 8%, 59 349 million US$ on the Base Scenario - discount rate 10%, and 57 796 million US$ on the Base Scenario - discount rate 12%. The objective function is 15 172 US$ on the Base Scenario - discount rate 8%, 12 663 million US$ on the Base Scenario - discount rate 10%, and 11 017 million US$ on the Base Scenario - discount rate 12%. (author)

  10. Environmental assessment of current and future Swiss electricity supply options

    International Nuclear Information System (INIS)

    Bauer, Christian; Heck, Thomas; Hirschberg, Stefan; Dones, Roberto

    2008-01-01

    Options for near future electricity supply are currently one of the main topics in the Swiss energy policy debate. Contrary to the total energy demand per capita the trend of rising electricity demand per capita is still visible. This paper presents a comparative environmental assessment of a broad portfolio of current and future electricity generation technologies including nuclear, fossil, and renewable power plants with their associated energy chains. The evaluation, based on Life Cycle Assessment (LCA), is carried out quantifying ten different environmental indicators, grouped in the categories greenhouse gas emissions, consumption of resources, waste, and impact on ecosystems. Hydropower shows minimal environmental impacts for all indicators; for other systems, the picture is diverse. The comparison of non-aggregated indicators allows preliminary conclusions about the environmental performance of the assessed systems. Establishing ranking of technologies calls for aggregating the indicators, which can be done by weighting of the indicators based on individual or stakeholder group preferences, either within a Multi-Criteria Decision Analysis (MCDA) framework or with Life Cycle Impact Assessment (LCIA) methods. Calculating total costs of electricity by adding external costs due to impacts on human health and ecosystems to the electricity production costs poses another option for ranking of technologies. (authors)

  11. External cost of coal based electricity generation: A tale of Ahmedabad city

    International Nuclear Information System (INIS)

    Mahapatra, Diptiranjan; Shukla, Priyadarshi; Dhar, Subash

    2012-01-01

    Electricity production causes unintended impacts. Their exclusion by the market leads to suboptimal resource allocations. Monetizing and internalizing of external costs, though challenging and debatable, leads to a better allocation of economic resources and welfare. In this paper, a life-cycle analysis (LCA) on the production of electricity from conventional coal based electricity generation system has been performed in order to examine the environmental impacts of coal based electricity generating systems in the twin-city of Ahmedabad and Gandhinagar in western India. By using dose–response functions, we make an attempt to estimate the damages to human health, crops, and building materials resulting from the operation of coal power plants and its associated mines. Further, we use geographic information system to account for spatially dependent data. Finally, monetary values have been assigned to estimate the damage to human health, crops and building materials. This study reveals that the health as well as on non-health impacts of air pollution resulting from coal based electricity generation may not be ignored both in absolute as well as economic value terms. Highlights: ► External cost from coal power generating systems has been calculated. ► We use LCA approach to monetize externalities. ► Geographic information software has been used to account for spatially dependent data. ► This study monetizes damages only to human health, crops, and building materials. ► We finally recommend policy directions to arrest this externality.

  12. Thermoecological cost of electricity production in the natural gas pressure reduction process

    International Nuclear Information System (INIS)

    Kostowski, Wojciech J.; Usón, Sergio; Stanek, Wojciech; Bargiel, Paweł

    2014-01-01

    The paper presents a novel concept for thermodynamic evaluation of a selected energy system. The presented method has been developed by integration of the Thermo-Economic Analysis with the theory of Thermo-Ecological Cost. It can be applied as a thermodynamic evaluation method of rational resources management within any production system. It takes into account both the interrelation of irreversibility within the analyzed system and its influence on the global effects related to the depletion of non-renewable natural resources. The proposed method has been applied to evaluate the production of electricity in the process of natural gas transmission at pressure reduction stations. The expansion system is based on an existing plant integrated with a CHP module, characterized by a performance ratio of 89.5% and exergy efficiency of 49.2%. Within the paper, this expansion plant is supplied with natural gas transported from a natural deposit through a case-study transmission system with 4 compressor stations. The TEC (thermoecological cost) method was applied in conjunction with thermoeconomic analysis. As a result, TEC of the electricity generated in the expanders was determined at 2.42 kJ/kJ, TEC of electricity from the CHP module is 1.77, and the TEC of medium-pressure natural gas distributed to consumers is 1.022. - Highlights: • The chain of NG transmission with an exergy recovery expansion plant was analyzed. • New methodology coupling the TEC (thermoecological cost) and thermoeconomics. • Decomposition of the TEC formation process. • Case-study transmission system yields TEC of natural gas = 1.0222. • Expansion plant yields TEC of electricity 2.42 (expanders) and 1.77 (CHP module)

  13. The effects of regional insolation differences upon advanced solar thermal electric power plant performance and energy costs

    Science.gov (United States)

    Latta, A. F.; Bowyer, J. M.; Fujita, T.

    1979-01-01

    This paper presents the performance and cost of four 10-MWe advanced solar thermal electric power plants sited in various regions of the continental United States. Each region has different insolation characteristics which result in varying collector field areas, plant performance, capital costs, and energy costs. The paraboloidal dish, central receiver, cylindrical parabolic trough, and compound parabolic concentrator (CPC) comprise the advanced concepts studied. This paper contains a discussion of the regional insolation data base, a description of the solar systems' performances and costs, and a presentation of a range for the forecast cost of conventional electricity by region and nationally over the next several decades.

  14. Manufacturing cost analysis of a parabolic dish concentrator (General Electric design) for solar thermal electric power systems in selected production volumes

    Science.gov (United States)

    1981-01-01

    The manufacturing cost of a General Electric 12 meter diameter concentrator was estimated. This parabolic dish concentrator for solar thermal system was costed in annual production volumes of 100 - 1,000 - 5,000 - 10,000 - 50,000 100,000 - 400,000 and 1,000,000 units. Presented for each volume are the costs of direct labor, material, burden, tooling, capital equipment and buildings. Also presented is the direct labor personnel and factory space requirements. All costs are based on early 1981 economics.

  15. Establishment of windows-based load management system for electricity cost savings in competitive electricity markets

    International Nuclear Information System (INIS)

    Chung, K.H.; Kim, B.H.; Hur, D.

    2007-01-01

    For electricity markets to function in a truly competitive and efficient manner, it is not enough to focus solely on improving the efficiencies of power supply. To recognize price-responsive load as a reliability resource, the customer must be provided with price signals and an instrument to respond to these signals, preferably automatically. This paper attempts to develop the Windows-based load management system in competitive electricity markets, allowing the user to monitor the current energy consumption or billing information, to analyze the historical data, and to implement the consumption strategy for cost savings with nine possible scenarios adopted. Finally, this modeling framework will serve as a template containing the basic concepts that any load management system should address. (author)

  16. Valuation of opportunity costs by rats working for rewarding electrical brain stimulation.

    Directory of Open Access Journals (Sweden)

    Rebecca Brana Solomon

    Full Text Available Pursuit of one goal typically precludes simultaneous pursuit of another. Thus, each exclusive activity entails an "opportunity cost:" the forgone benefits from the next-best activity eschewed. The present experiment estimates, in laboratory rats, the function that maps objective opportunity costs into subjective ones. In an operant chamber, rewarding electrical brain stimulation was delivered when the cumulative time a lever had been depressed reached a criterion duration. The value of the activities forgone during this duration is the opportunity cost of the electrical reward. We determined which of four functions best describes how objective opportunity costs, expressed as the required duration of lever depression, are translated into their subjective equivalents. The simplest account is the identity function, which equates subjective and objective opportunity costs. A variant of this function called the "sigmoidal-slope function," converges on the identity function at longer durations but deviates from it at shorter durations. The sigmoidal-slope function has the form of a hockey stick. The flat "blade" denotes a range over which opportunity costs are subjectively equivalent; these durations are too short to allow substitution of more beneficial activities. The blade extends into an upward-curving portion over which costs become discriminable and finally into the straight "handle," over which objective and subjective costs match. The two remaining functions are based on hyperbolic and exponential temporal discounting, respectively. The results are best described by the sigmoidal-slope function. That this is so suggests that different principles of intertemporal choice are involved in the evaluation of time spent working for a reward or waiting for its delivery. The subjective opportunity-cost function plays a key role in the evaluation and selection of goals. An accurate description of its form and parameters is essential to successful

  17. External cost of coal based electricity generation:A tale of Ahmedabad city

    DEFF Research Database (Denmark)

    Mahapatra, Diptiranjan; Shukla, Priyadarshi; Dhar, Subash

    2012-01-01

    Electricity production causes unintended impacts.Theire xclusion by the market leads to suboptimal resource allocations.Monetizing and internalizing of external costs, though challenging and debatable, leads to a better allocation of economic resources and welfare. In this paper, a life-cycle ana......Electricity production causes unintended impacts.Theire xclusion by the market leads to suboptimal resource allocations.Monetizing and internalizing of external costs, though challenging and debatable, leads to a better allocation of economic resources and welfare. In this paper, a life......–response functions, we make an attempt to estimate the damages to human health, crops, and building materials resulting from the operation of coal power plants and its associated mines. Further, we use geographic information system to account for spatially dependent data. Finally, monetary values have been assigned...

  18. Cost/benefit assessment in electric power systems

    International Nuclear Information System (INIS)

    Oteng-Adjei, J.

    1990-01-01

    The basic function of a modern power system is to satisfy the system load requirements as economically as possible and with a reasonable assurance of continuity and quality. The question of what is reasonable can be examined in terms of the costs and the worth to the consumer associated with providing an adequate supply. The process of preparing reliability worth estimates based on customer cost-of-interruption data is presented. These data can be derived for a particular utility service area and are used to determine appropriate customer damage functions. These indicators can be used with the basic loss of energy expectation (LOEE) index to obtain a factor that can be utilized to relate the customer losses to the worth of electric service reliability. This factor is designated as the interrupted energy assessment rate (IEAR). The developed IEAR values can be utilized in both generating capacity and composite generation and transmission system assessment. Methods for using these estimates in power system optimization at the planning stages are described and examples are used to illustrate the procedures. 106 refs., 77 figs., 64 tabs

  19. Households' willingness to pay for safeguarding security of natural gas supply in electricity generation

    International Nuclear Information System (INIS)

    Damigos, D.; Tourkolias, C.; Diakoulaki, D.

    2009-01-01

    Security of energy supply is a major issue for all EU Member States due to Europe's increasing dependence on imported fossil-fuel sources and the continuous rise in energy demand. The latter is of particular importance in electricity sector given the continuously increasing use of gas for electricity generation. In order to properly tackle with the problem, concerted actions are required by the EU Member States in several levels, i.e. legislative, political, etc. Nevertheless, these actions will come at an additional cost paid by the society either through increased electricity bills or through public financing for energy security investments. Thus, such policies should be justified on the basis of cost-benefit analysis. Towards this direction, it may be necessary to take into account non-market costs and benefits, i.e. the value that consumers place on interruptions avoided. In order to explore households' perceptions and willingness to pay for securing gas supply for electricity production, an empirical study was conducted by means of the contingent valuation method. The results indicate that consumers are willing to pay a premium on their electricity bills in order to internalize the external costs of electricity production, in terms of energy security, which are caused from imported fuels. (author)

  20. Cost Effectiveness Analysis of Quasi-In-Motion Wireless Power Transfer for Plug-In Hybrid Electric Transit Buses from Fleet Perspective

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Lijuan; Gonder, Jeff; Brooker, Aaron; Meintz, Andrew; Konan, Arnaud; Markel, Tony

    2016-05-16

    This study evaluated the costs and benefits associated with the use of stationary-wireless-power-transfer-enabled plug-in hybrid electric buses and determined the cost effectiveness relative to conventional buses and hybrid electric buses. A factorial design was performed over a number of different battery sizes, charging power levels, and f bus stop charging stations. The net present costs were calculated for each vehicle design and provided the basis for design evaluation. In all cases, given the assumed economic conditions, the conventional bus achieved the lowest net present cost while the optimal plug-in hybrid electric bus scenario beat out the hybrid electric comparison scenario. The parameter sensitivity was also investigated under favorable and unfavorable market penetration assumptions.

  1. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg. Previously announced in STAR as N83-24764

  2. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg.

  3. Industrial plant electrical systems: Simplicity, reliability, cost savings, redundancies

    International Nuclear Information System (INIS)

    Silvestri, A.; Tommazzolli, F.; Pavia Univ.

    1992-01-01

    This article represents a compact but complete design and construction manual for industrial plant electrical systems. It is to be used by design engineers having prior knowledge of local power supply routes and voltages and regards principally the optimum choice of internal distribution systems which can be radial or single, double ringed or with various network configurations, and with single or multiple supplies, and many or few redundancies. After giving guidelines on the choosing of these options, the manual deals with problematics relevant to suitable cable sizing. A cost benefit benefit analysis method is suggested for the choice of the number of redundancies. Recommendations are given for the choice of transformers, motorized equipment, switch boards and circuit breakers. Reference is made to Italian electrical safety and building codes

  4. Cost modelling of electricity producing hot dry rock (HDR) geothermal systems in the UK

    International Nuclear Information System (INIS)

    Doherty, P.S.

    1992-03-01

    A detailed and comprehensive cost model for Hot Dry Rock (HDR) electricity producing systems has been developed in this study. The model takes account of the major aspects of the HDR system, parameterized in terms of the main physical and cost parameters of the resource and the utilization system. A doublet configuration is assumed, and the conceptual HDR system which is defined in the study is based upon the UK Department of Energy (DEn) HDR geothermal R and D programme. The model has been used to calculate the costs of HDR electricity for a UK defined base case which represents a consensus view of what might be achieved in Cornwall in the long term. At 14.2 p/kWh (1988 costs) this cost appears to be unacceptably high. A wide-ranging sensitivity study has also been carried out on the main resource, geometrical, and operational parameters of the HDR system centred around the UK base case. The sensitivity study shows the most important parameters to be thermal gradient and depth. (Author)

  5. Estimating the environmental costs of electricity: an overview and review of the issues

    International Nuclear Information System (INIS)

    Freeman, A.M. III

    1996-01-01

    This paper provides an overview of the issues associated with environmental costing and the specific questions raised by the effort to measure the environmental costs of electricity. It focuses on three sets of issues. The first set is several conceptual issues in the valuation of environmental impacts in general. These issues are not unique to valuing the environmental impacts of electricity generation. However each of these issues has been highlighted in one way or another by the studies being discussed here. The second set of issues are specific to the design of studies of environmental effects of generating electricity. These issues are the selection of externalities for inclusion in the analysis, and whether and to what extent to include so called upstream and downstream impacts. The third set of issues involves policy implications of the results of the work that has been done to date. Factors considered include health effects of air emissions, damage to ecosystems, damage by CO 2 . 31 refs

  6. The Rise and Fall in Out-of-Pocket Costs in Australia: An Analysis of the Strengthening Medicare Reforms.

    Science.gov (United States)

    Wong, Chun Yee; Greene, Jessica; Dolja-Gore, Xenia; van Gool, Kees

    2017-08-01

    After a period of steady decline, out-of-pocket (OOP) costs for general practitioner (GP) consultations in Australia began increasing in the mid-1990s. Following the rising community concerns about the increasing costs, the Australian Government introduced the Strengthening Medicare reforms in 2004 and 2005, which included a targeted incentive for GPs to charge zero OOP costs for consultations provided to children and concession cardholders (older adults and the poor), as well as an increase in the reimbursement for all GP visits. This paper examines the impact of those reforms using longitudinal survey and administrative data from a large national sample of women. The findings suggest that the reforms were effective in reducing OOP costs by an average of $A0.40 per visit. Decreases in OOP costs, however, were not evenly distributed. Those with higher pre-reform OOP costs had the biggest reductions in OOP costs, as did those with concession cards. However, results also reveal increases in OOP costs for most people without a concession card. The analysis suggests that there has been considerable heterogeneity in GP responses to the reforms, which has led to substantial changes in the fees charged by doctors and, as a result, the OOP costs incurred by different population groups. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  7. Towards electricity markets accommodating uncertain offers

    DEFF Research Database (Denmark)

    Papakonstantinou, Athanasios; Pinson, Pierre

    2014-01-01

    formulation of an electricity market, based on the Continuous Ranked Probability Score (CRPS) reduces the impact of poor estimates for both the stochastic producers and the system operator. We introduce a simulation setting which first demonstrates that impact and then proceed to illustrate the main features......The use of renewable energy sources of energy and in particular wind and solar has been on the rise over the last decades with plans to increase it even more. Such developments introduce significant challenges in existing power systems and can result in high electricity prices and costly...... infrastructure investments. In this paper we propose a new electricity market mechanism whereby the uncertain and dynamic nature of wind power and other stochastic sources is embedded in the market mechanism itself, by modelling producers’ bids as probabilistic estimates. An extension on the bilevel programming...

  8. Lifecycle cost assessment and carbon dioxide emissions of diesel, natural gas, hybrid electric, fuel cell hybrid and electric transit buses

    International Nuclear Information System (INIS)

    Lajunen, Antti; Lipman, Timothy

    2016-01-01

    This paper evaluates the lifecycle costs and carbon dioxide emissions of different types of city buses. The simulation models of the different powertrains were developed in the Autonomie vehicle simulation software. The carbon dioxide emissions were calculated both for the bus operation and for the fuel and energy pathways from well to tank. Two different operating environment case scenarios were used for the primary energy sources, which were Finland and California (USA). The fuel and energy pathways were selected appropriately in relation to the operating environment. The lifecycle costs take into account the purchase, operating, maintenance, and possible carbon emission costs. Based on the simulation results, the energy efficiency of city buses can be significantly improved by the alternative powertrain technologies. Hybrid buses have moderately lower carbon dioxide emissions during the service life than diesel buses whereas fully-electric buses have potential to significantly reduce carbon dioxide emissions, by up to 75%. The lifecycle cost analysis indicates that diesel hybrid buses are already competitive with diesel and natural gas buses. The high costs of fuel cell and battery systems are the major challenges for the fuel cell hybrid buses in order to reduce lifecycle costs to more competitive levels. - Highlights: • Alternative powertrains can significantly improve energy efficiency of transit buses. • Operating environment has an important impact on the lifecycle costs of buses. • Diesel hybrid buses are already cost effective solution for public transportation. • The cost of fuel cell technology is the major challenge for fuel cell hybrid buses. • Fully-electric buses have potential to significantly reduce carbon dioxide emissions.

  9. Electricity generation cost in isolated system: The complementarities of natural gas and renewables in the Canary Islands

    Energy Technology Data Exchange (ETDEWEB)

    Marrero, Gustavo A. [Facultad de Ciencias Economicas, Campus de Guajara, Universidad de La Laguna, 38071 Santa Cruz de Tenerife (Canary Islands) (Spain); Fundacion de Estudios de Economia Aplicada (FEDEA), C/Jorge Juan 46, 28001 Madrid (Spain); Ramos-Real, Francisco Javier [Facultad de Ciencias Economicas, Campus de Guajara, Universidad de La Laguna, 38071 Santa Cruz de Tenerife (Canary Islands) (Spain); Instituto Universitario de Desarrollo Regional, Facultad de Ciencias Economicas, Campus de Guajara, Universidad de La Laguna, 38071 Santa Cruz de Tenerife (Canary Islands) (Spain)

    2010-12-15

    The Canary Islands offer an example of an isolated electric grid of relative important size within the EU. Due to its peculiarities, the role of renewable energies and their complementarity with fossil fuels offers a solid path to achieving the main energy policy goals of the Islands. The purpose of this paper is to assess the current situation and the energy objectives proposed in the Energy Plan of the Canaries (PECAN, 2006) for the electricity industry, taking into account the average cost and the risk associated with the different alternatives for generating electricity by means of the Mean-Variance Portfolio Theory. Our analysis highlights the inefficiency of the current electricity generating mix in terms of cost, risk and lack of diversification. Shifting toward an efficient system would involve optimizing the use of endogenous energy sources and introducing natural gas to generate electricity. This scenario would mean reducing both cost and risk by almost 30% each, as well as atmospheric CO{sub 2} emissions. Our results agree with the PECAN philosophy. (author)

  10. Marginal abatement cost curve for nitrogen oxides incorporating controls, renewable electricity, energy efficiency, and fuel switching.

    Science.gov (United States)

    Loughlin, Daniel H; Macpherson, Alexander J; Kaufman, Katherine R; Keaveny, Brian N

    2017-10-01

    A marginal abatement cost curve (MACC) traces out the relationship between the quantity of pollution abated and the marginal cost of abating each additional unit. In the context of air quality management, MACCs are typically developed by sorting control technologies by their relative cost-effectiveness. Other potentially important abatement measures such as renewable electricity, energy efficiency, and fuel switching (RE/EE/FS) are often not incorporated into MACCs, as it is difficult to quantify their costs and abatement potential. In this paper, a U.S. energy system model is used to develop a MACC for nitrogen oxides (NO x ) that incorporates both traditional controls and these additional measures. The MACC is decomposed by sector, and the relative cost-effectiveness of RE/EE/FS and traditional controls are compared. RE/EE/FS are shown to have the potential to increase emission reductions beyond what is possible when applying traditional controls alone. Furthermore, a portion of RE/EE/FS appear to be cost-competitive with traditional controls. Renewable electricity, energy efficiency, and fuel switching can be cost-competitive with traditional air pollutant controls for abating air pollutant emissions. The application of renewable electricity, energy efficiency, and fuel switching is also shown to have the potential to increase emission reductions beyond what is possible when applying traditional controls alone.

  11. Cost analysis of an electricity supply chain using modification of price based dynamic economic dispatch in wheeling transaction scheme

    Science.gov (United States)

    Wahyuda; Santosa, Budi; Rusdiansyah, Ahmad

    2018-04-01

    Deregulation of the electricity market requires coordination between parties to synchronize the optimization on the production side (power station) and the transport side (transmission). Electricity supply chain presented in this article is designed to facilitate the coordination between the parties. Generally, the production side is optimized with price based dynamic economic dispatch (PBDED) model, while the transmission side is optimized with Multi-echelon distribution model. Both sides optimization are done separately. This article proposes a joint model of PBDED and multi-echelon distribution for the combined optimization of production and transmission. This combined optimization is important because changes in electricity demand on the customer side will cause changes to the production side that automatically also alter the transmission path. The transmission will cause two cost components. First, the cost of losses. Second, the cost of using the transmission network (wheeling transaction). Costs due to losses are calculated based on ohmic losses, while the cost of using transmission lines using the MW - mile method. As a result, this method is able to provide best allocation analysis for electrical transactions, as well as emission levels in power generation and cost analysis. As for the calculation of transmission costs, the Reverse MW-mile method produces a cheaper cost than the Absolute MW-mile method

  12. External costs as a measure of environmental impact in the generation of electricity in Poland

    Science.gov (United States)

    Cel, W.; Czechowska-Kosacka, A.; Kujawska, Justyna; Wasąg, H.

    2018-05-01

    The depletion of natural resources, rising fossil fuel prices and growing environmental awareness, are leading to an increase in the popularity of renewable energy sources. In Poland, the share of energy derived from renewable sources continues to grow and now stands at 12.9% of the country’s gross electricity consumption. Energy from renewable sources in Poland is 60€ more expensive per MWh than energy from conventional sources. According to the European Climate and Energy Package, Poland is committed to increasing its share of renewable energy to 15% in 2020, and a further 5% by 2030. It is very important to ensure that the increase in the share of renewable energy will increase the price of energy for the end users. To convince the public of the need to incur greater costs in the purchase of “green” power, we should put forward arguments showing the benefits of its use. The aim of this paper is to demonstrate the viability of support through a system of certification for renewable energy sources and also to estimate the potential increase in energy prices caused by raising RES contribution.

  13. External Costs Associated with Electricity Generation in Lithuania: Impact of Ignalina NPP Closure

    International Nuclear Information System (INIS)

    Streimikiene, D.

    2000-01-01

    Sustainability and development have been founded on continuing growth in energy demand and distribution, and management of natural resources through proper allocation and efficiency. It is clear that the use of energy in all its forms and applications provides an enormous benefit to society. However, it is also associated with numerous environmental and social challenges, such as, e.g., the health effects of air pollution. These burdens are referred to as external costs, as they have not been included in the market price of energy. The purpose of externalities research is to quantify damages in order to allow rational decisions to be made that weigh the benefits of actions to reduce externalities against the costs of doing so. Ultimately, market failure could be reduced by internalization of the external costs during energy planning. The paper deals with the problems of external costs associated with electricity generation in Lithuania and evaluates the environmental impact related to increased atmospheric pollution when the first unit at Ignalina NPP will be closed in 2005. Simplified methodology for the evaluation of external costs based on Impact Pathway Approach developed by International Atomic Energy Agency was applied. Achieved results indicate that due to the increased atmospheric pollution the external costs associated with electricity generation in the case of the first unit closure at Ignalina NPP would amount to 130 million USD. (author)

  14. The importance of marginal cost electricity pricing to the success of greenhouse gas reduction programs

    International Nuclear Information System (INIS)

    Friedman, Lee S.

    2011-01-01

    The efficient reduction of GHG emissions requires appropriate retail pricing of off-peak electricity. However, off-peak electricity for residential consumers is priced at 331% above its marginal cost in the United States as a whole (June 2009). Even for the 1% of residences that are on some form of time-of-use (TOU) rate schedule, the off-peak rate is almost three times higher than the marginal cost. A barrier to marginal-cost based TOU rates is that less than 9% of U.S. households have the 'smart' meters in place that can measure and record the time of consumption. Policies should be put in place to achieve full deployment. Another important barrier is consumer concern about TOU rate design. Two TOU rate designs (baseline and two-part tariff) are described that utilize marginal-cost based rates, ensure appropriate cost recovery, and minimize bill changes from current rate structures. A final barrier is to get residences on to these rates. Should a marginal-cost based TOU rate design remain an alternative for which residences could 'opt-in,' or become the default choice, or become mandatory? Time-invariant rates are a historical anachronism that subsidize very costly peak-period consumption and penalize off-peak usage to our environmental detriment. They should be phased out. - Highlights: → Off-peak electricity for residences is priced at 331% above marginal cost in the US. → This inefficiently deters vehicle electrification that could reduce GHG emissions. → 9% of U.S. households have the 'smart' meters necessary for time-of-use rates. → Time-invariant rates cause substantial environmental harm and should be phased out.

  15. System Dynamics Modeling of Households' Electricity Consumption and Cost-Income Ratio: a Case Study of Latvia

    Science.gov (United States)

    Bariss, Uldis; Bazbauers, Gatis; Blumberga, Andra; Blumberga, Dagnija

    2017-11-01

    Increased energy efficiency of the building sector is high on the list of priorities for energy policy since better energy efficiency would help to reduce impact on climate change and increase security of energy supply. One aim of the present study was to find a relative effect of growth of demand for energy services due to changes in income, energy consumption per unit of demand due to technological development, changes in electricity price and household income on household electricity consumption in Latvia. The method applied included system dynamics modeling and data from a household survey regarding the relationship between electricity saving activities and the electricity cost-income ratio. The results revealed that, in direct contrast to the expected, a potential reduction of the electricity consumption is rather insensitive to electricity price and electricity cost-income ratio, and that the efficiency of technologies could be the main drivers for future electricity savings. The results suggest that support to advancement of technologies and faster replacement of inefficient ones rather than influencing the energy price could be effective energy policy measures. The model, developed in the study could be used in similar assessments in other countries.

  16. THE COSTS OF THE ELECTRICAL ENERGY IN THE ALUMINIUM INDUSTRY

    Directory of Open Access Journals (Sweden)

    Cilianu Marian

    2012-07-01

    Full Text Available The economic crisis has given the opportunity to reconsider the use of resources, so the subject of competitive advantage has become actual. In the aluminium industry the cost of electrical energy is critical not only for competitive reasons but for the mere existence and performance of numerous production facilities . Several ways of resisting the pressure of high energy costs have been experimented the most promising being those based on different forms of public-private partnership/co-operation. In many countries the big industrial producers benefit from a special treatment concerning the energy acquisition and are supported by the government in order to remain competitive.

  17. A methodology to identify stranded generation facilities and estimate stranded costs for Louisiana's electric utility industry

    Science.gov (United States)

    Cope, Robert Frank, III

    1998-12-01

    The electric utility industry in the United States is currently experiencing a new and different type of growing pain. It is the pain of having to restructure itself into a competitive business. Many industry experts are trying to explain how the nation as a whole, as well as individual states, will implement restructuring and handle its numerous "transition problems." One significant transition problem for federal and state regulators rests with determining a utility's stranded costs. Stranded generation facilities are assets which would be uneconomic in a competitive environment or costs for assets whose regulated book value is greater than market value. At issue is the methodology which will be used to estimate stranded costs. The two primary methods are known as "Top-Down" and "Bottom-Up." The "Top-Down" approach simply determines the present value of the losses in revenue as the market price for electricity changes over a period of time into the future. The problem with this approach is that it does not take into account technical issues associated with the generation and wheeling of electricity. The "Bottom-Up" approach computes the present value of specific strandable generation facilities and compares the resulting valuations with their historical costs. It is regarded as a detailed and difficult, but more precise, approach to identifying stranded assets and their associated costs. This dissertation develops a "Bottom-Up" quantitative, optimization-based approach to electric power wheeling within the state of Louisiana. It optimally evaluates all production capabilities and coordinates the movement of bulk power through transmission interconnections of competing companies in and around the state. Sensitivity analysis to this approach is performed by varying seasonal consumer demand, electric power imports, and transmission inter-connection cost parameters. Generation facility economic dispatch and transmission interconnection bulk power transfers, specific

  18. Estimation of the Levelised Electricity Generation Cost for a PWR-Power Plant and Preliminary Evaluation of National Participation

    International Nuclear Information System (INIS)

    Saba, G; Hainoun, A

    2008-01-01

    This work deals with the detailed economic evaluation of the Levelised discounted electricity generation costs (LDEGC) for a nuclear power plant with pressurized water reactor (PWR). The total generation costs are splited in base construction costs, supplementary costs, owner's costs, financial costs, fuel cycle costs and operation and maintenance costs. The evaluation covers also the sensitivity of the estimated energy unit cost to various factors (real annual discount rate, escalation rate, interest rate, load factor, ..) including the role of national participation, that depends upon the development of national infrastructure. For performing this study the IAEA's program package for economic bid evaluation (Bideval-3) has been employed. The program is designed to assist the user in the economic evaluation of bids for nuclear power plant (NPP). It follows the recommended method of determining the present worth value of all costs components for generated electricity unit. The performed study aims at developing national expertise in the field of bid evaluation for electric power plants with main emphasis on NPP. Additional goal is to convoying the technical and economic development of NPP technology that can help in supporting the decision maker with adequate information related to the future development of energy supply system and measures required for ensuring national energy supply security. (author)

  19. Incorporating the cost of protecting the environment into decisions about electric power

    International Nuclear Information System (INIS)

    Ottinger, R.; Robinson, N.; Wooley, D.

    1991-01-01

    This paper reviews the range of issues raised by the task of valuing the environmental impacts resulting from generation and conservation of electric power. We review the literature on the methodologies used to assign monetary costs to environmental externalities and present the results of studies which have applied these methodologies. For those environmental damages for which the literature has not established a value, the paper identifies the indicative ranges of adverse effects and provides a map of issues that require research. The paper is intended to assist utilities, government regulators, legislators, policy analysts, and public interest groups in estimating the costs of the environmental impacts of electricity. It should be useful, as well, to assist in valuing the environmental impacts of pollutants from other industries, for setting environmental control standards, and in establishing pollution taxes or fees. (author)

  20. Does public insurance provide better financial protection against rising health care costs for families of children with special health care needs?

    Science.gov (United States)

    Yu, Hao; Dick, Andrew W; Szilagyi, Peter G

    2008-10-01

    Health care costs grew rapidly since 2001, generating substantial economic pressures on families, especially those with children with special health care needs (CSHCN). To examine how the growth of health care costs affected financial burden for families of CSHCN between 2001 and 2004 and to determine the extent to which health insurance coverage protected families of CSHCN against financial burden. In 2001-2004, 5196 families of CSHCN were surveyed by the national Medical Expenditure Panel Survey (MEPS). The main outcome was financial burden, defined as the proportion of family income spent on out-of-pocket (OOP) health care expenditures for all family members, including OOP costs and premiums. Family insurance coverage was classified as: (1) all members publicly insured, (2) all members privately insured, (3) all members uninsured, (4) partial coverage, and (5) a mix of public and private with no uninsured periods. An upward trend in financial burden for families of CSHCN occurred and was associated with growth of economy-wide health care costs. A multivariate analysis indicated that, given the economy-wide increase in medical costs between 2001 and 2004, a family with CSHCN was at increased risk in 2004 for having financial burden exceeding 10% of family income [odds ratio (OR) = 1.39; P financial burden exceeding 20% of family income. Over 15% of families with public insurance had financial burden exceeding 10% of family income compared with 20% of families with private insurance (P financial burden of >10% or 20% of family income than privately-insured families. Rising health care costs increased financial burden on families of CSHCN in 2001-2004. Public insurance coverage provided better financial protection than private insurance against the rapidly rising health care costs for families of CSHCN.

  1. Minimising the expectation value of the procurement cost in electricity markets based on the prediction error of energy consumption

    OpenAIRE

    Yamaguchi, Naoya; Hori, Maiya; Ideguchi, Yoshinari

    2018-01-01

    In this paper, we formulate a method for minimising the expectation value of the procurement cost of electricity in two popular spot markets: {\\it day-ahead} and {\\it intra-day}, under the assumption that expectation value of unit prices and the distributions of prediction errors for the electricity demand traded in two markets are known. The expectation value of the total electricity cost is minimised over two parameters that change the amounts of electricity. Two parameters depend only on t...

  2. Smart campus: Data on energy generation costs from distributed generation systems of electrical energy in a Nigerian University.

    Science.gov (United States)

    Okeniyi, Joshua O; Atayero, Aderemi A; Popoola, Segun I; Okeniyi, Elizabeth T; Alalade, Gbenga M

    2018-04-01

    This data article presents comparisons of energy generation costs from gas-fired turbine and diesel-powered systems of distributed generation type of electrical energy in Covenant University, Ota, Nigeria, a smart university campus driven by Information and Communication Technologies (ICT). Cumulative monthly data of the energy generation costs, for consumption in the institution, from the two modes electric power, which was produced at locations closed to the community consuming the energy, were recorded for the period spanning January to December 2017. By these, energy generation costs from the turbine system proceed from the gas-firing whereas the generation cost data from the diesel-powered generator also include data on maintenance cost for this mode of electrical power generation. These energy generation cost data that were presented in tables and graphs employ descriptive probability distribution and goodness-of-fit tests of statistical significance as the methods for the data detailing and comparisons. Information details from this data of energy generation costs are useful for furthering research developments and aiding energy stakeholders and decision-makers in the formulation of policies on energy generation modes, economic valuation in terms of costing and management for attaining energy-efficient/smart educational environment.

  3. Identifying critical success factors (CSFs) of Facilities Management (FM) in non-low cost high-rise residential buildings

    Science.gov (United States)

    Dahlan, F. M.; Zainuddin, A.

    2018-02-01

    Critical success factors (CSFs) are important key areas of activity that must be performed well in any Facilities Management (FM) organisation to achieve its missions, objectives or goals. Before implementing CSFs, an FM organisation must identify the key areas where things must be done properly to enable the business to flourish. Although many performance measurements in FM organisation have been discussed in previous research, not much research has been done on CSFs from the perspective of FM business in non-low cost high-rise residential buildings. The purpose of this study is to develop a methodology in developing the CSFs group and CSFs for FM organisation in non-low cost residential buildings. This research will involve three (3) phases of research strategy to achieve the objective of this research.

  4. Carbon emission and mitigation cost comparisons between fossil fuel, nuclear and renewable energy resources for electricity generation

    International Nuclear Information System (INIS)

    Sims, R.E.H.; Rogner, H.-H.; Gregory, Ken

    2003-01-01

    A study was conducted to compare the electricity generation costs of a number of current commercial technologies with technologies expected to become commercially available within the coming decade or so. The amount of greenhouse gas emissions resulting per kWh of electricity generated were evaluated. A range of fossil fuel alternatives (with and without physical carbon sequestration), were compared with the baseline case of a pulverised coal, steam cycle power plant. Nuclear, hydro, wind, bioenergy and solar generating plants were also evaluated. The objectives were to assess the comparative costs of mitigation per tonne of carbon emissions avoided, and to estimate the total amount of carbon mitigation that could result from the global electricity sector by 2010 and 2020 as a result of fuel switching, carbon dioxide sequestration and the greater uptake of renewable energy. Most technologies showed potential to reduce both generating costs and carbon emission avoidance by 2020 with the exception of solar power and carbon dioxide sequestration. The global electricity industry has potential to reduce its carbon emissions by over 15% by 2020 together with cost saving benefits compared with existing generation

  5. Cost function estimates, scale economies and technological progress in the Turkish electricity generation sector

    International Nuclear Information System (INIS)

    Ali Akkemik, K.

    2009-01-01

    Turkish electricity sector has undergone significant institutional changes since 1984. The recent developments since 2001 including the setting up of a regulatory agency to undertake the regulation of the sector and increasing participation of private investors in the field of electricity generation are of special interest. This paper estimates cost functions and investigates the degree of scale economies, overinvestment, and technological progress in the Turkish electricity generation sector for the period 1984-2006 using long-run and short-run translog cost functions. Estimations were done for six groups of firms, public and private. The results indicate existence of scale economies throughout the period of analysis, hence declining long-run average costs. The paper finds empirical support for the Averch-Johnson effect until 2001, i.e., firms overinvested in an environment where there are excess returns to capital. But this effect was reduced largely after 2002. Technological progress deteriorated slightly from 1984-1993 to 1994-2001 but improved after 2002. Overall, the paper found that regulation of the market under the newly established regulating agency after 2002 was effective and there are potential gains from such regulation. (author)

  6. Cost of energy from utility-owned solar electric systems. A required revenue method for ERDA/EPRI evaluations

    Energy Technology Data Exchange (ETDEWEB)

    1976-06-01

    This methodology calculates the electric energy busbar cost from a utility-owned solar electric system. This approach is applicable to both publicly- and privately-owned utilities. Busbar cost represents the minimum price per unit of energy consistent with producing system-resultant revenues equal to the sum of system-resultant costs. This equality is expressed in present value terms, where the discount rate used reflects the rate of return required on invested capital. Major input variables describe the output capabilities and capital cost of the energy system, the cash flows required for system operation and maintenance, and the financial structure and tax environment of the utility.

  7. Costs, tariffs and electric power conservation: integrated purpose for the solution of the distribution

    International Nuclear Information System (INIS)

    Medeiros, R.

    1992-01-01

    The relations between costs and prices theory of energy with electricity conservation are discussed, analysing the demand characteristics by electricity and the importance of their knowledge for defining a politics for conservation. The theoretic treatment of the question is considered, mentioning the paper of the clients and the distributors, and the methodology used for energy conservation. (C.G.C.)

  8. Future demand for electricity in Nigeria

    International Nuclear Information System (INIS)

    Ibitoye, F.I.; Adenikinju, A.

    2007-01-01

    Availability and reliability of electricity supplies have always been vexed issue in Nigeria. With an estimated population of 130 million people in AD 2005, Nigeria is the most populous country in Africa and belongs to the group of countries with the lowest electricity consumption per capita in the continent. Nigeria is also ranked among the poorest countries in the world. This paper examines the likely trend in the demand for electricity over the next 25 years under the assumptions that (i) there is a rapid economic development such that Nigeria transforms from low- to middle-income economy during this period, (ii) Nigeria meets the millennium development goals (MDG) in AD 2015, and (iii) the country achieves the status of an industrializing nation. For these to happen, this paper projects that electric-power generation will have to rise from the current capacity of 6500 MW to over 160 GW in AD 2030. This level of supply will be significant enough to increase the per capita electricity consumption to about 5000 kWh per capita by the year 2030. Even then, this just compares with the AD 2003 per capital consumption of some industrializing countries. Analysis of the level of investment required to meet the projected power demand indicates that annual investment cost will rise from US3.8 billion in AD 2006 to a peak of US21 billion in AD 2028. The total investment stream over the 25 year period comes to US262 billion or roughly US10 billion per annum. (author)

  9. Reference costs of the electric power production; Couts de reference de la production electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-06-01

    This study periodically realized by the DGEMP aims to compare the competitiveness of the different channels of electric power production, for different utilization conditions. The first part ''reference costs of the 2003 electric power production'' examines the prices of the electric power produced by different channels in particular in the framework of the industrial implementing in 2015. The nuclear and thermal power plants are concerned. The second part is devoted to the decentralized production channels (wind energy, photovoltaic, cogeneration heat-electricity) is under construction and will be presented next year. (A.L.B.)

  10. Assessment of projected temperature impacts from climate change on the U.S. electric power sector using the Integrated Planning Model®

    International Nuclear Information System (INIS)

    Jaglom, Wendy S.; McFarland, James R.; Colley, Michelle F.; Mack, Charlotte B.; Venkatesh, Boddu; Miller, Rawlings L.; Haydel, Juanita; Schultz, Peter A.; Perkins, Bill; Casola, Joseph H.; Martinich, Jeremy A.; Cross, Paul; Kolian, Michael J.; Kayin, Serpil

    2014-01-01

    This study analyzes the potential impacts of changes in temperature due to climate change on the U.S. power sector, measuring the energy, environmental, and economic impacts of power system changes due to temperature changes under two emissions trajectories—with and without emissions mitigation. It estimates the impact of temperature change on heating and cooling degree days, electricity demand, and generating unit output and efficiency. These effects are then integrated into a dispatch and capacity planning model to estimate impacts on investment decisions, emissions, system costs, and power prices for 32 U.S. regions. Without mitigation actions, total annual electricity production costs in 2050 are projected to increase 14% ($51 billion) because of greater cooling demand as compared to a control scenario without future temperature changes. For a scenario with global emissions mitigation, including a reduction in U.S. power sector emissions of 36% below 2005 levels in 2050, the increase in total annual electricity production costs is approximately the same as the increase in system costs to satisfy the increased demand associated with unmitigated rising temperatures. - Highlights: • We model the impact of rising temperatures on the U.S. power sector. • We examine temperature and mitigation impacts on demand, supply, and investment. • Higher temperatures increase power system costs by about $50 billion by the year 2050. • Meeting demand from higher temperatures costs slightly more than reducing emissions. • Mitigation policy cost analyses should account for temperature impacts

  11. A Review of Recent RTO Benefit-Cost Studies: Toward MoreComprehensive Assessments of FERC Electricity RestructuringPolicies

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Lesieutre, Bernard C.

    2005-12-01

    During the past three years, government and private organizations have issued more than a dozen studies of the benefits and costs of Regional Transmission Organizations (RTOs). Most of these studies have focused on benefits that can be readily estimated using traditional production-cost simulation techniques, which compare the cost of centralized dispatch under an RTO to dispatch in the absence of an RTO, and on costs associated with RTO start-up and operation. Taken as a whole, it is difficult to draw definitive conclusions from these studies because they have not examined potentially much larger benefits (and costs) resulting from the impacts of RTOs on reliability management, generation and transmission investment and operation, and wholesale electricity market operation. This report: (1) Describes the history of benefit-cost analysis of FERC electricity restructuring policies; (2)Reviews current practice by analyzing 11 RTO benefit-cost studies that were published between 2002 and 2004 and makes recommendations to improve the documentation of data and methods and the presentation of findings in future studies that focus primarily on estimating short-run economic impacts; and (3) Reviews important impacts of FERC policies that have been overlooked or incompletely treated by recent RTO benefit-cost studies and the challenges to crafting more comprehensive assessments of these impacts based on actual performance, including impacts on reliability management, generation and transmission investment and operation, and wholesale electricity market operation.

  12. User's guide to SERICPAC: A computer program for calculating electric-utility avoided costs rates

    Energy Technology Data Exchange (ETDEWEB)

    Wirtshafter, R.; Abrash, M.; Koved, M.; Feldman, S.

    1982-05-01

    SERICPAC is a computer program developed to calculate average avoided cost rates for decentralized power producers and cogenerators that sell electricity to electric utilities. SERICPAC works in tandem with SERICOST, a program to calculate avoided costs, and determines the appropriate rates for buying and selling of electricity from electric utilities to qualifying facilities (QF) as stipulated under Section 210 of PURA. SERICPAC contains simulation models for eight technologies including wind, hydro, biogas, and cogeneration. The simulations are converted in a diversified utility production which can be either gross production or net production, which accounts for an internal electricity usage by the QF. The program allows for adjustments to the production to be made for scheduled and forced outages. The final output of the model is a technology-specific average annual rate. The report contains a description of the technologies and the simulations as well as complete user's guide to SERICPAC.

  13. The marginal costs like reference for the decision of electric energy cogeneration in Brazil

    International Nuclear Information System (INIS)

    Silva, D.B. da; Eduardo, J.H.B.P.

    1987-01-01

    The electric cogeneration question, in a form of optimal utilization of high quality chemical energy in some industrial processes, or a form of employment of any others feedstocks, can be discussed on economics view, with the marginal costs reference, actually in implantation in Brazilian Electrical Sector. In this article, some ideas are presented about the mentioned discussion, in the Brazilian Electric Sector ambient, including analysis of laws and proposed directions for its modifications, looking for the cogeneration activity development in Brazil. (author)

  14. Production costs and operative margins in electric energy generation from biogas. Full-scale case studies in Italy.

    Science.gov (United States)

    Riva, C; Schievano, A; D'Imporzano, G; Adani, F

    2014-08-01

    The purpose of this study was to observe the economic sustainability of three different biogas full scale plants, fed with different organic matrices: energy crops (EC), manure, agro-industrial (Plants B and C) and organic fraction of municipal solid waste (OFMSW) (Plant A). The plants were observed for one year and total annual biomass feeding, biomass composition and biomass cost (€ Mg(-1)), initial investment cost and plant electric power production were registered. The unit costs of biogas and electric energy (€ Sm(-3)biogas, € kWh(-1)EE) were differently distributed, depending on the type of feed and plant. Plant A showed high management/maintenance cost for OFMSW treatment (0.155 € Sm(-3)biogas, 45% of total cost), Plant B suffered high cost for EC supply (0.130 € Sm(-3)biogas, 49% of total cost) and Plant C showed higher impact on the total costs because of the depreciation charge (0.146 € Sm(-3)biogas, 41% of total costs). The breakeven point for the tariff of electric energy, calculated for the different cases, resulted in the range 120-170 € MWh(-1)EE, depending on fed materials and plant scale. EC had great impact on biomass supply costs and should be reduced, in favor of organic waste and residues; plant scale still heavily influences the production costs. The EU States should drive incentives in dependence of these factors, to further develop this still promising sector. Copyright © 2014 Elsevier Ltd. All rights reserved.

  15. Nuclear electric capacity expansion in Mexico: system effects of reactor size and cost

    International Nuclear Information System (INIS)

    Thayer, G.R.; Abbey, D.S.; Hardie, R.W.; Enriquez, R.P.; Uria, E.G.

    1984-01-01

    Mexico's electrical generation capacity could more than double over the next ten years - from about 15 GWe currently to as much as 35 GWe in 1990. While new capacity additions will be predominantly oil-fired in the 1980's, nuclear power will become increasingly important in the 1990's. This study investigated the appropriate size of new, nuclear capacity additions by assessing the implications of installing different size reactors into Mexico's electrical grid. Included in the assessments of reactor sizes are estimates of electrical generation costs and comparisons of the effective load-carrying capability of a 10 GWe nuclear capacity expansion

  16. Influence of wind power, plug-in electric vehicles, and heat storages on power system investments

    DEFF Research Database (Denmark)

    Kiviluoma, Juha; Meibom, Peter

    2010-01-01

    Due to rising fuel costs, the substantial price for CO2 emissions and decreasing wind power costs, wind power might become the least expensive source of power for an increasing number of power systems. This poses the questions of how wind power might change optimal investments in other forms...... of power production and what kind of means could be used to increase power system flexibility in order to incorporate the variable power production from wind power in a cost-effective manner. We have analysed possible effects using an investment model that combines heat and power production and simulates...... electric vehicles. The model runs in an hourly time scale in order to accommodate the impact of variable power production from wind power. Electric vehicles store electricity for later use and can thus serve to increase the flexibility of the power system. Flexibility can also be upgraded by using heat...

  17. The costs of the environmental administration in the planning of the electric sector in Colombia - methodological aspects

    International Nuclear Information System (INIS)

    Jurado Montano, Jose Lino

    2001-01-01

    The environmental costs came forth in the planning of the Colombian electrical sector by early 90's. The costs of environmental programs for generation projects were calculated, considering constraints and assumptions, some of them are still valid. The necessity to know the environmental costs of generation and transmission projects in preliminary stages of planning, as complement to indicative expansion plans, allowed the development of a model that assesses in advance the impacts and defines the costs of their environmental measures in future stages of construction and operation. The model uses geo-referenced basic information but sufficient to determine multiple impact and cost indicators. This model was developed with the active participation of representative agents of the electrical sector and will support UPME in valuation of expansion plans and it can supply preliminary costs to potential project investors in this sector

  18. The benefits and costs of reducing emissions from the electricity sector.

    Science.gov (United States)

    Palmer, Karen; Burtraw, Dallas; Shih, Jhih-Shyang

    2007-04-01

    Recent federal policy proposals to reduce emissions of sulfur dioxide (SO(2)), nitrogen oxides (NO(x)), and mercury from the US electricity sector promise important improvements in air quality and reductions in acid deposition. The cost of achieving these reductions depends on the form and stringency of the regulation. In this research, we analyze the economic benefits and costs of the US Environmental Protection Agency's (EPA's) Clean Air Interstate Rule (CAIR) as characterized in the supplemental rule proposed in June 2004, and the Clean Air Mercury Rule (CAMR) as proposed in February 2004. The assessment integrates a model of the electricity sector, two models of atmospheric transport of air pollutants, and a model of environmental and public health endpoints affected by pollution. We model explicitly the emissions of SO(2), NO(x), mercury and carbon dioxide (CO(2)) and the effects of changes in emissions of SO(2) and NO(x) on environmental and public health. The manner in which mercury emissions are regulated will have important implications not only for the cost of the regulation, but also for emission levels for SO(2) and NO(x) and where those emissions are located. We find the economic benefits of CAIR and CAMR are far greater than the costs. Recent estimates of benefits of reductions in mercury and acidification indicate that our model captures the lion's share of quantifiable benefits. We also find that the EPA would have been justified on economic grounds in pursuing additional SO(2) emissions reductions beyond the requirements of CAIR.

  19. Labor demand effects of rising electricity prices: Evidence for Germany

    International Nuclear Information System (INIS)

    Cox, Michael; Peichl, Andreas; Pestel, Nico; Siegloch, Sebastian

    2014-01-01

    Germany continues to play a pioneering role in replacing conventional power plants with renewable energy sources. While this might be beneficial with respect to environmental quality, it also implies increasing electricity prices. The extent to which this is associated with negative impacts on employment depends on the interrelationship between labor and electricity as input factors in the production process. In this paper, we estimate cross-price elasticities between electricity and heterogeneous labor for the German manufacturing sector. We use administrative linked employer–employee micro-data combined with information on sector-level electricity prices and usage over the period 2003–2007. We find positive, but small conditional cross-price elasticities of labor demand with respect to electricity prices, which means that electricity as an input factor can be replaced by labor to a limited extent when the production level is held constant. In the case of adjustable output, we find negative unconditional cross-price elasticities, implying that higher electricity prices lead to output reductions and to lower labor demand, with low- and high-skilled workers being affected more than medium-skilled. Resulting adverse distributional effects and potential overall job losses may pose challenges for policy-makers in securing public support for the German energy turnaround. - Highlights: • We estimate cross-price elasticities for electricity and labor in manufacturing. • We use linked employer–employee micro-data from Germany for 2003 to 2007. • We find a weak substitutability between electricity and labor for constant output. • We find complementarity between electricity and labor for adjustable output. • Low- and high-skilled workers are more affected than medium-skilled

  20. Validation of a methodology for the study of generation cost of electric power for nuclear power plants

    International Nuclear Information System (INIS)

    Ortega C, R.F.; Martin del Campo M, C.

    2004-01-01

    It was developed a model for the calculation of costs of electric generation of nuclear plants. The developed pattern was validated with the one used by the United States Council for Energy Awareness (USCEA) and the Electric Power Research Institute (EPRI), in studies of comparison of alternatives for electric generation of nuclear plants and fossil plants with base of gas and of coal in the United States described in the guides calls Technical Assessment Guides of EPRI. They are mentioned in qualitative form some changes in the technology of nucleo electric generation that could be included in the annual publication of Costs and Parameters of Reference for the Formulation of Projects of Investment in the Electric Sector of the Federal Commission of Electricity. These changes are in relation to the advances in the technology, in the licensing, in the construction and in the operation of the reactors called advanced as the A BWR built recently in Japan. (Author)

  1. Cost estimates for nuclear power in the UK

    International Nuclear Information System (INIS)

    Harris, Grant; Heptonstall, Phil; Gross, Robert; Handley, David

    2013-01-01

    Current UK Government support for nuclear power has in part been informed by cost estimates that suggest that electricity from new nuclear power stations will be competitive with alternative low carbon generation options. The evidence and analysis presented in this paper suggests that the capital cost estimates for nuclear power that are being used to inform these projections rely on costs escalating over the pre-construction and construction phase of the new build programme at a level significantly below those that have been experienced by past US and European programmes. This paper applies observed construction time and cost escalation rates to the published estimates of capital costs for new nuclear plant in the UK and calculates the potential impact on levelised cost per unit of electricity produced. The results suggest that levelised cost may turn out to be significantly higher than expected which in turn has important implications for policy, both in general terms of the potential costs to consumers and more specifically for negotiations around the level of policy support and contractual arrangements offered to individual projects through the proposed contract for difference strike price. -- Highlights: •Nuclear power projects costs can rise substantially during the construction period. •Pre-construction and construction time can be much longer than anticipated. •Adjusting estimates for observed experience increases levelised costs significantly. •Higher costs suggest that more policy support than envisaged may be required

  2. Cost-effectiveness of plug-in hybrid electric vehicle battery capacity and charging infrastructure investment for reducing US gasoline consumption

    International Nuclear Information System (INIS)

    Peterson, Scott B.; Michalek, Jeremy J.

    2013-01-01

    Federal electric vehicle (EV) policies in the United States currently include vehicle purchase subsidies linked to EV battery capacity and subsidies for installing charging stations. We assess the cost-effectiveness of increased battery capacity vs. nondomestic charging infrastructure installation for plug-in hybrid electric vehicles as alternate methods to reduce gasoline consumption for cars, trucks, and SUVs in the US. We find across a wide range of scenarios that the least-cost solution is for more drivers to switch to low-capacity plug-in hybrid electric vehicles (short electric range with gasoline backup for long trips) or gasoline-powered hybrid electric vehicles. If more gasoline savings are needed per vehicle, nondomestic charging infrastructure installation is substantially more expensive than increased battery capacity per gallon saved, and both approaches have higher costs than US oil premium estimates. Cost effectiveness of all subsidies are lower under a binding fuel economy standard. Comparison of results to the structure of current federal subsidies shows that policy is not aligned with fuel savings potential, and we discuss issues and alternatives. - Highlights: ► We compare cost of PHEV batteries vs. charging infrastructure per gallon of gasoline saved. ► The lowest cost solution is to switch more drivers to low-capacity PHEVs and HEVs. ► If more gasoline savings is needed, batteries offer a better value than chargers. ► Extra batteries and chargers are both more costly per gal than oil premium estimates. ► Current subsidies are misaligned with fuel savings. We discuss alternatives.

  3. The downstream side of the nuclear fuel cycle. Tome II: Electricity generating costs

    International Nuclear Information System (INIS)

    Bataille, Ch.; Galley, R.

    1999-01-01

    As part of the Office's continuing work in the nuclear field, Mr. Christian Bataille and Mr. Robert Galley, Members of Parliament for the Nord and Aube departements respectively, published in June 1998 the first part of their investigation into the downstream side of the nuclear fuel cycle, focusing on the work done in application of the law of 30 December 1991 concerning research into radioactive waste management. This document supplements that initial technical approach with a technical and economic study of the costs of generating electricity. To begin with, the performance of existing nuclear generating plant is examined, in particular the past, present and future contributions of this plant to the growth and competitiveness of the French economy. Secondly, the competitiveness of the different generating systems is analysed with a view to the construction of new facilities, using the method of discounted average costs which is at present the standard approach governing investment decisions, and identifying the different ways in which the said systems are dealt with as regards the cost categories considered. The potential contributions of external factor analysis and the calculation of external costs are then reviewed in order to evaluate the advantages and drawbacks of the different electricity generating systems on a more global basis. The report includes more than a hundred tables of data and cost curves upon which the Rapporteurs base their comments, conclusions and recommendations

  4. Evaluation of wind energy investment interest and electricity generation cost analysis for Turkey

    International Nuclear Information System (INIS)

    Akdag, Seyit Ahmet; Gueler, Oender

    2010-01-01

    Turkey has remarkable wind energy potential, but its utilisation rate is very low. However, in 2007, energy investors applied to the Energy Market Regulatory Authority (EMRA) with 751 wind projects to obtain a 78180.2 MW wind power plant license. This paper first presents an overview of wind energy development in the world and then reviews related situations in Turkey. Second, to motivate the interest in wind energy investment, new wind power plant license applications in Turkey are analysed. Finally, wind electricity generation cost analyses were performed at 14 locations in Turkey. Capacity factors of investigated locations were calculated between 19.7% and 56.8%, and the production cost of electrical energy was between 1.73 and 4.99 cent/kW h for two different wind shear coefficients. (author)

  5. Cost structure analysis of commercial nuclear power plants in Japan based on corporate financial statements of electric utility companies

    International Nuclear Information System (INIS)

    Kunitake, Norifumi; Nagano, Koji; Suzuki, Tatsujiro

    1998-01-01

    In this paper, we analyze past and current cost structure of commercial nuclear power plants in Japan based on annual corporate financial statements published by the Japanese electric utility companies, instead of employing the conventional methodology of evaluating the generation cost for a newly constructed model plant. The result of our study on existing commercial nuclear plants reveals the increasing significance of O and M and fuel cycle costs in total generation cost. Thus, it is suggested that electric power companies should take more efforts to reduce these costs in order to maintain the competitiveness of nuclear power in Japan. (author)

  6. Review of nuclear power costs around the world

    International Nuclear Information System (INIS)

    Bennett, L.L.; Karousakis, P.M.; Moynet, G.

    1983-01-01

    This paper presents highlights of nuclear power costs around the world from studies carried out by the IAEA and by UNIPEDE. Emphasis is placed on trends within each country of key parameters which affect both investment costs and total power generation costs, including construction and project durations, size of units, regulatory environment, scope of project, fuel cycle costs and general economic conditions. A synthesis of these trends, taking into consideration both nuclear and coal-fired plant capital and fuel costs as they are estimated to evolve in the near and medium term, is presented in terms of nuclear-to-coal cost ratios for both plant investment costs and total generating costs. The plant investment costs are expressed as ''overnight'' or ''fore'' costs, in constant money, for plants expected to enter commercial operation in the early 1990s. Pertinent assumptions are based on conditions prevailing in the particular country under review. These studies indicate that in most countries nuclear plant investment costs are rising more rapidly than the costs for coal-fired plants. A major cause for the rapid rise in nuclear plant costs is the drastic lengthening of project duration in most countries. France, as a notable exception, has been able to maintain a stable and reasonably short project time. In spite of the rapidly escalating nuclear plant investment costs, nuclear electricity generation has an economic advantage over coal in Europe and Canada and is competitive with coal in the eastern and midwestern parts of the United States of America (USA). The availability of abundant, low-cost coal gives coal-fired generation an economic advantage in the western USA. (author)

  7. Large-scale offshore wind energy. Cost analysis and integration in the Dutch electricity market

    International Nuclear Information System (INIS)

    De Noord, M.

    1999-02-01

    The results of analysis of the construction and integration costs of large-scale offshore wind energy (OWE) farms in 2010 are presented. The integration of these farms (1 and 5 GW) in the Dutch electricity distribution system have been regarded against the background of a liberalised electricity market. A first step is taken for the determination of costs involved in solving integration problems. Three different types of foundations are examined: the mono-pile, the jacket and a new type of foundation: the concrete caisson pile: all single-turbine-single-support structures. For real offshore applications (>10 km offshore, at sea-depths >20 m), the concrete caisson pile is regarded as the most suitable. The price/power ratios of wind turbines are analysed. It is assumed that in 2010 turbines in the power range of 3-5 MW are available. The main calculations have been conducted for a 3 MW turbine. The main choice in electrical infrastructure is for AC or DC. Calculations show that at distances of 30 km offshore and more, the use of HVDC will result in higher initial costs but lower operating costs. The share of operating and maintenance (O ampersand M) costs in the kWh cost price is approximately 3.3%. To be able to compare the two farms, a base case is derived with a construction time of 10 years for both. The energy yield is calculated for a wind regime offshore of 9.0 m/s annual mean wind speed. Per 3 MW turbine this results in an annual energy production of approximately 12 GWh. The total farm efficiency amounts to 82%, resulting in a total farm capacity factor of 38%. With a required internal rate of return of 15%, the kWh cost price amounts to 0.24 DFl and 0.21 DFl for the 1 GW and 5 GW farms respectively in the base case. The required internal rate of return has a large effect on the kWh cost price, followed by costs of subsystems. O ampersand M costs have little effect on the cost price. Parameter studies show that a small cost reduction of 5% is possible when

  8. AN APPLICATION FOR ELECTRICAL PRODUCTION WITH SOLAR TOWER SYSTEM

    Directory of Open Access Journals (Sweden)

    Reşat SELBAŞ

    2003-02-01

    Full Text Available The requirement of electric energy rises with increasing of the population and faster improvement demands. Energy necessity generally is provided by using fossil based fuel sources. In order to supply energy requirements, today, using alternative sources became necessary because of the problems such as decreasing of available fossil fuel sources and environment pollution from this fuel. The solar energy which has a wide range of application potential is the most hopeful and unlimited energy source without environment pollution in electric energy production. In this paper, the electric production methods from solar energy are studied and the most suitable method for solar energy plant is tried to find out. The selected method, known as Solar Tower in literature is an electric production method. In this study, technical and cost analysis of an application using this method are carried out.

  9. Private electricity consumption on the rise -- the impact of networking

    International Nuclear Information System (INIS)

    Aebischer, B.; Huser, A.

    2001-01-01

    This article discusses the effect of the networking of the various devices to be found in the average home and the trend towards increased electricity consumption that will be brought about by 'intelligent' houses. Different scenarios for the increase in electricity consumption due to the increased use of multimedia systems - from the personal computer and mobile phones to hi-fi systems and the Internet are discussed. The contrasting tendencies noted in this area - such as, for example, the use of electricity to operate systems that are used to optimise and thus reduce electricity consumption in general are also discussed. Also, indirect energy-reduction effects in other areas - such as traffic reduction as a result of tele-working - are examined. Results of simulations and prognoses made concerning future trends for the electricity consumption of the various devices in homes are presented and recommendations are made on how to keep electricity consumption low when networking domestic apparatus

  10. The effect of climate change on electricity needs – A case study from Mediterranean Europe

    International Nuclear Information System (INIS)

    Zachariadis, Theodoros; Hadjinicolaou, Panos

    2014-01-01

    This paper assesses additional electricity requirements and the associated costs in the Mediterranean island of Cyprus by the mid-21st century because of projected anthropogenic climate change, following an interdisciplinary approach that combines climate science with economics. An econometric model of electricity demand is used, in conjunction with climate projections from a state-of-the-art Global Circulation Model with a regional focus on the Eastern Mediterranean. Annual electricity demand is projected to rise by about 6% compared to a ‘no climate change’ case. Although these additional power requirements are not very remarkable on an annual basis, total costs up to 2050, which may exceed 730 million Euros at today's prices, imply that the country may need to forgo one or two years of economic growth in order to cope with extra electricity needs due to climate change. This outlook indicates that a reasonable future energy path in regions with Mediterranean climate would involve substantial deployment of solar-powered electricity generation, which can meet peak load requirements while reducing the country's energy dependence. Moreover, this forecast highlights the need for adaptation to climate change through investments in the improvement of the energy performance of the building stock. - Highlights: • Assessment of additional electricity needs in Cyprus because of climate change. • Use of econometric model of electricity demand and regional climate projections. • Annual electricity demand to rise by 6% by 2050 due to climate change. • Welfare losses of up to more than 150 million Euros (at 2010 prices) per year. • Impacts can be tackled by use of solar power and energy efficiency improvements

  11. Study of design parameters for minimizing the cost of electricity of tokamak fusion power reactors

    International Nuclear Information System (INIS)

    Tokimatsu, K.; Yamaji, K.; Katsurai, M.; Okano, K.; Yoshida, T.

    1998-01-01

    The impact of the design parameters on the cost of electricity (COE) is studied through a parameter survey in order to minimize the COE. Three kinds of operating modes are considered; first stability (FS), second stability (SS) and reversed shear (RS). The COE is calculated by a coupled physics-engineering-cost computer system code. Deuterium-tritium type, 1000 MW(e) at electric bus bar, steady state tokamak reactors with aspect ratios A from 3 to 4.5 are assumed. Several criteria are used for the parameter survey; for example, (a) the thermal to electrical conversion efficiency is assumed to be 34.5% using water as a coolant; (b) the average neutron wall load must not exceed 5 MW/m 2 for plasma major radius R p >5 m; (c) a 2 MeV neutral beam injector (NBI) is applied. It is found that the RS operating mode most minimizes the COE among the three operating modes by reducing the cost of the current drive and the coils and structures. The cost-minimized RS reactor can attain high f bs , high β N and low q 95 at the same time, which results in a short R p of 5.1 m, a low B max of the maximum magnetic toroidal field (TF) of the TF coils of 13 T and a low A of 3.0. It can be concluded that this cost-minimized RS reactor is the most cost-minimized within the frameworks of this study. This cost-minimized RS reactor has two advantages: one is that a B max =13 T TF coil can be made by use of ITER coil technology and the other is that the same cooling technology as that of ITER (water cooling) can be used. (author)

  12. Development of a global electricity supply model and investigation of electricity supply by renewable energies with a focus on energy storage requirements for Europe

    Energy Technology Data Exchange (ETDEWEB)

    Troendle, Tobias Wolfgang

    2014-12-12

    Electricity supply at present requires about 38% of the global primary energy demand and it is likely to rise further in the coming decades. Facing major problems, such as limited resources of fuels and an ongoing anthropogenic climate change, a sustainable electricity supply based on renewable energies is absolutely vital. Wind and solar power will play an extensive role in future supplies but require energy storage capacities to meet electricity demand. To investigate the relationship of power plant mix and required energy storage capacity, a computer model based on global weather data has been developed to enable the simulation of electricity supply scenarios by up to ten different power plant types for various regions. The focus of the investigation has been on the energy storage requirements of an electricity supply for Europe by wind and solar power. The minimum required energy storage capacity for a totally weather dependent electricity supply occurs at a ratio of 30% wind and 70% photovoltaic (PV) power plant capacity installed. Thus, the required energy storage capacity rises from a transition of to-day's electricity supply to the afore-mentioned 100% renewable wind and PV scenario exponentially to about 150 TWh (3.8% of the annual electricity demand). The installation of additional excess wind and PV power plant capacity was seen to be an efficient way to reduce the required energy storage. Already 10% excess capacity lead to a reduction by 50% of the required storage capacity. To use different storage technologies in an optimised way in terms of storage capacity and efficiency, the storage tasks can be separated into a daily and a seasonal usage. While the seasonal storage capacity has to be about two orders of magnitude larger than the required capacity of the storage for the daily cycle, the sum of stored energy during one year is almost equal for the long and short time storage. In summary, an electricity supply by wind and PV power was shown to

  13. Development of a global electricity supply model and investigation of electricity supply by renewable energies with a focus on energy storage requirements for Europe

    International Nuclear Information System (INIS)

    Troendle, Tobias Wolfgang

    2014-01-01

    Electricity supply at present requires about 38% of the global primary energy demand and it is likely to rise further in the coming decades. Facing major problems, such as limited resources of fuels and an ongoing anthropogenic climate change, a sustainable electricity supply based on renewable energies is absolutely vital. Wind and solar power will play an extensive role in future supplies but require energy storage capacities to meet electricity demand. To investigate the relationship of power plant mix and required energy storage capacity, a computer model based on global weather data has been developed to enable the simulation of electricity supply scenarios by up to ten different power plant types for various regions. The focus of the investigation has been on the energy storage requirements of an electricity supply for Europe by wind and solar power. The minimum required energy storage capacity for a totally weather dependent electricity supply occurs at a ratio of 30% wind and 70% photovoltaic (PV) power plant capacity installed. Thus, the required energy storage capacity rises from a transition of to-day's electricity supply to the afore-mentioned 100% renewable wind and PV scenario exponentially to about 150 TWh (3.8% of the annual electricity demand). The installation of additional excess wind and PV power plant capacity was seen to be an efficient way to reduce the required energy storage. Already 10% excess capacity lead to a reduction by 50% of the required storage capacity. To use different storage technologies in an optimised way in terms of storage capacity and efficiency, the storage tasks can be separated into a daily and a seasonal usage. While the seasonal storage capacity has to be about two orders of magnitude larger than the required capacity of the storage for the daily cycle, the sum of stored energy during one year is almost equal for the long and short time storage. In summary, an electricity supply by wind and PV power was shown to

  14. Construction cost impact analysis of the U.S. Department of Energy mandatory performance standards for new federal commercial and multi-family, high-rise residential buildings

    International Nuclear Information System (INIS)

    Di Massa, F.V.; Hadley, D.L.; Halverson, M.A.

    1993-12-01

    In accordance with federal legislation, the U.S. Department of Energy (DOE) has conducted a project to demonstrate use of its Energy Conservation Voluntary Performance Standards for Commercial and Multi-Family High-Rise Residential Buildings; Mandatory for New Federal Buildings; Interim Rule (referred to in this report as DOE-1993). A key requisite of the legislation requires DOE to develop commercial building energy standards that are cost effective. During the demonstration project, DOE specifically addressed this issue by assessing the impacts of the standards on (1) construction costs, (2) builders (and especially small builders) of multi-family, high-rise buildings, and (3) the ability of low-to moderate-income persons to purchase or rent units in such buildings. This document reports on this project

  15. Measuring the costs of photovoltaics in an electric utility planning framework

    International Nuclear Information System (INIS)

    Awerbuch, Shimon

    1993-01-01

    Utility planning models evaluate alternative generating options using the revenue requirements method-an engineering-oriented, discounted cash-flow (DCF) methodology that has been widely used for over three decades. Discounted cash-flow techniques were conceived in the context of active expense-intensive technologies, such as conventional, fuel-intensive power generation. Photovoltaic (PV) technology, by contrast, is passive and capital intensive-attributes that are similar to those of other new process technologies, such as computer-integrated manufacturing. Discounted cash-flow techniques have a dismal record for correctly valuing new technologies with these attributes, in part because their benefits cannot be easily measured using traditional accounting concepts. This paper examines how these issues affect cost measurement in both conventional and PV-based electricity, and presents kWh-cost estimates for three technologies (coal, gas and PV) using risk-adjusted approaches, which suggest that PV costs are generally equivalent to the gas/combined cycle and about twice the cost of base-load coal (environmental externalities are ignored). Finally, the paper evaluates independent power purchases for a typical US utility and finds that in such a setting the cost of PV-based power is comparable to the firm's published avoided costs. (author)

  16. Conceptual Design of Operation Strategies for Hybrid Electric Aircraft

    Directory of Open Access Journals (Sweden)

    Julian Hoelzen

    2018-01-01

    Full Text Available Ambitious targets to reduce emissions caused by aviation in the light of an expected ongoing rise of the air transport demand in the future drive the research of propulsion systems with lower CO2 emissions. Regional hybrid electric aircraft (HEA powered by conventional gas turbines and battery powered electric motors are investigated to test hybrid propulsion operation strategies. Especially the role of the battery within environmentally friendly concepts with significantly reduced carbon footprint is analyzed. Thus, a new simulation approach for HEA is introduced. The main findings underline the importance of choosing the right power-to-energy-ratio of a battery according to the flight mission. The gravimetric energy and power density of the electric storages determine the technologically feasibility of hybrid concepts. Cost competitive HEA configurations are found, but do not promise the targeted CO2 emission savings, when the well-to-wheel system is regarded with its actual costs. Sensitivity studies are used to determine external levers that favor the profitability of HEA.

  17. Geography and the costs of urban energy infrastructure: The case of electricity and natural gas capital investments

    Science.gov (United States)

    Senyel, Muzeyyen Anil

    Investments in the urban energy infrastructure for distributing electricity and natural gas are analyzed using (1) property data measuring distribution plant value at the local/tax district level, and (2) system outputs such as sectoral numbers of customers and energy sales, input prices, company-specific characteristics such as average wages and load factor. Socio-economic and site-specific urban and geographic variables, however, often been neglected in past studies. The purpose of this research is to incorporate these site-specific characteristics of electricity and natural gas distribution into investment cost model estimations. These local characteristics include (1) socio-economic variables, such as income and wealth; (2) urban-related variables, such as density, land-use, street pattern, housing pattern; (3) geographic and environmental variables, such as soil, topography, and weather, and (4) company-specific characteristics such as average wages, and load factor. The classical output variables include residential and commercial-industrial customers and sales. In contrast to most previous research, only capital investments at the local level are considered. In addition to aggregate cost modeling, the analysis focuses on the investment costs for the system components: overhead conductors, underground conductors, conduits, poles, transformers, services, street lighting, and station equipment for electricity distribution; and mains, services, regular and industrial measurement and regulation stations for natural gas distribution. The Box-Cox, log-log and additive models are compared to determine the best fitting cost functions. The Box-Cox form turns out to be superior to the other forms at the aggregate level and for network components. However, a linear additive form provides a better fit for end-user related components. The results show that, in addition to output variables and company-specific variables, various site-specific variables are statistically

  18. Fuel prices, emission standards, and generation costs for coal vs natural gas power plants.

    Science.gov (United States)

    Pratson, Lincoln F; Haerer, Drew; Patiño-Echeverri, Dalia

    2013-05-07

    Low natural gas prices and stricter, federal emission regulations are promoting a shift away from coal power plants and toward natural gas plants as the lowest-cost means of generating electricity in the United States. By estimating the cost of electricity generation (COE) for 304 coal and 358 natural gas plants, we show that the economic viability of 9% of current coal capacity is challenged by low natural gas prices, while another 56% would be challenged by the stricter emission regulations. Under the current regulations, coal plants would again become the dominant least-cost generation option should the ratio of average natural gas to coal prices (NG2CP) rise to 1.8 (it was 1.42 in February 2012). If the more stringent emission standards are enforced, however, natural gas plants would remain cost competitive with a majority of coal plants for NG2CPs up to 4.3.

  19. Smart campus: Data on energy generation costs from distributed generation systems of electrical energy in a Nigerian University

    Directory of Open Access Journals (Sweden)

    Joshua O. Okeniyi

    2018-04-01

    Full Text Available This data article presents comparisons of energy generation costs from gas-fired turbine and diesel-powered systems of distributed generation type of electrical energy in Covenant University, Ota, Nigeria, a smart university campus driven by Information and Communication Technologies (ICT. Cumulative monthly data of the energy generation costs, for consumption in the institution, from the two modes electric power, which was produced at locations closed to the community consuming the energy, were recorded for the period spanning January to December 2017. By these, energy generation costs from the turbine system proceed from the gas-firing whereas the generation cost data from the diesel-powered generator also include data on maintenance cost for this mode of electrical power generation. These energy generation cost data that were presented in tables and graphs employ descriptive probability distribution and goodness-of-fit tests of statistical significance as the methods for the data detailing and comparisons. Information details from this data of energy generation costs are useful for furthering research developments and aiding energy stakeholders and decision-makers in the formulation of policies on energy generation modes, economic valuation in terms of costing and management for attaining energy-efficient/smart educational environment. Keywords: Smart campus, Energy consumption, Energy efficiency, Load forecasting, Energy management, Learning analytics, Nigerian university, Education data mining

  20. Risk, innovation, electricity infrastructure and construction cost overruns: Testing six hypotheses

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.; Gilbert, Alex; Nugent, Daniel

    2014-01-01

    This study investigates the frequency and magnitude of cost and time overruns occurring during the construction of 401 electricity projects built between 1936 and 2014 in 57 countries. In aggregate, these projects required approximately $820 billion in investment, and amounted to 325,515 MW of installed capacity and 8495 km of transmission lines. We use this sample of projects to test six hypotheses about construction cost overruns related to (1) diseconomies of scale, (2) project delays, (3) technological learning, (4) regulation and markets, (5) decentralization and modularity, and (6) normalization of results to scale. We find that nuclear reactors are the riskiest technology in terms of mean cost escalation as a percentage of budget and frequency; that hydroelectric dams stand apart for their mean cost escalation in total dollars; that many of the hypotheses grounded in the literature appear wrong; and that financing, partnerships, modularity, and accountability may have more to do with overruns than technology. - Highlights: • Many hypotheses about construction overruns grounded in the literature appear wrong. • Nuclear reactors are the most prone to cost overruns as a percentage of budget and frequency. • Hydroelectric dams stand apart for their mean cost escalation in total dollars. • Solar and wind energy systems are least at risk to cost overruns

  1. Challenges to China's transition to a low carbon electricity system

    International Nuclear Information System (INIS)

    Kahrl, Fredrich; Williams, Jim; Ding Jianhua; Hu Junfeng

    2011-01-01

    We examine the challenges to China's transition to a low carbon electricity system, in which renewable energy would play a significant role. China's electricity system currently lacks the flexibility in planning, operations, and pricing to respond to conflicting pressures from demand growth, rising costs, and environmental mandates in a way that simultaneously maintains reliability, decarbonizes the system, and keeps prices within acceptable bounds. Greater flexibility crucially requires the ability to more systematically and transparently manage and allocate costs. This will require re-orientating sector institutions still rooted in central planning, and strengthening independent regulation. Some of the necessary changes require fundamental political and legal reforms beyond the scope of energy policy. However, the system's flexibility can still be increased through the development of traditional planning and regulatory tools and approaches, such as an avoided cost basis for energy efficiency investments, more integrated planning to improve the coordination of generation, transmission, and demand-side investments, and a transparent ratemaking process. The judicious application of OECD electricity sector experience and skills can support these developments. - Research highlights: → China's electricity system currently lacks the flexibility to integrate renewables and reduce CO 2 emissions on a large scale at an acceptable cost and level of reliability. → The challenges to increased flexibility are more institutional than technological. → Chinese government agencies need new approaches to basic power system planning and ratemaking. → OECD countries can help address these challenges through the transfer of 'soft' technologies.

  2. Cost analysis of electrical power from an ethanol reformer and the fuel cell in the development of productive activities in the community Pico do Amor, MT, Brazil; Analise do custo da energia eletrica proveniente de um reformador de etanol e celula a combustivel no desenvolvimento de atividades produtivas na comunidade Pico do Amor/MT

    Energy Technology Data Exchange (ETDEWEB)

    Lopes, Davi Gabriel; Teixeira, Andre Frazao; Lopes, Daniel Gabriel; Cavaliero, Carla Kazue Nakao [Universidade Estadual de Campinas (DE/FEM/UNICAMP), SP (Brazil). Faculdade de Engenharia Mecanica. Departamento de Energia; Instituto Aqua Genesis, Campinas, SP (Brazil); Hytron, Campinas, SP (Brazil)

    2010-07-01

    This work has the objective to analyze the impact of the cost of from an ethane reformer / fuel cell in the family income considering the development of two productive activities selected by the community itself: the production and marketing of cassava flour and 'rapadura', a typical brazilian candy. The community energy demand was analyzed to achieve the results; estimated the energy cost from the implemented system and the money from the selling of the cassava flour and 'rapadura' produced with this electricity; the study of sensibility of the ethanol price in the electrical energy cost was done too, and the cassava flour and 'rapadura' in the family funds. From the results, it was verified that the electrical energy cost has a 16,4% impact in the family gross income and a net value around R$ 260,85/family, indicating that the community will have enough funds to pay for the energy and also will rise the amount of money for each family. Besides, the comparative analyze of the cost of the electricity from the ethanol/fuel cell reformer and photovoltaic systems shows that, considering only the maintenance and operation costs, the first one should be more attractive than the second one. (author)

  3. Effects of pellet yield on electricity cost in laser fusion generating stations

    International Nuclear Information System (INIS)

    Bohachevsky, I.O.; Booth, L.A.; Hafer, J.F.; Pendergrass, J.H.

    1978-01-01

    The dependence of capital and net electricity production costs on fuel pellet yield is investigated for laser fusion reactors based on the magnetically protected and the wetted wall reactor cavity concepts. It is determined that above a certain pellet yield, which depends on the cavity concept, diseconomies of scale occur and the costs per unit output increase with increasing fuel pellet yield. This behavior, determined with the trade-off and analysis computer code TROFAN, is explained through analytical examination of the scaling rules for the laser fusion reactor components

  4. Optimal Willingness to Supply Wholesale Electricity Under Asymmetric Linearized Marginal Costs

    Directory of Open Access Journals (Sweden)

    David Hudgins

    2012-01-01

    Full Text Available This analysis derives the profit-maximizing willingness to supply functions for single-plant and multi-plant wholesale electricity suppliers that all incur linear marginal costs. The optimal strategy must result in linear residual demand functions in the absence of capacity constraints. This necessarily leads to a linear pricing rule structure that can be used by firm managers to construct their offer curves and to serve as a benchmark to evaluate firm profit-maximizing behavior. The procedure derives the cost functions and the residual demand curves for merged or multi-plant generators, and uses these to construct the individual generator plant offer curves for a multi-plant firm.

  5. Low-Cost Energy-Efficient 3-D Nano-Spikes-Based Electric Cell Lysis Chips

    KAUST Repository

    Riaz, Kashif; Leung, Siu; Fan, Zhiyong; Lee, Yi-Kuen

    2017-01-01

    Electric cell lysis (ECL) is a promising technique to be integrated with portable lab-on-a-chip without lysing agent due to its simplicity and fast processing. ECL is usually limited by the requirements of high power/voltage and costly fabrication

  6. Quantity Surveying Undergraduates’ Awareness on Cost Significant of High-Rise Condominium Projects in Malaysia: The Case of a Private University in Malaysia

    Directory of Open Access Journals (Sweden)

    Peng Lee Wah

    2016-01-01

    Full Text Available Recent developments in quantity surveying (QS emphasised the importance of identifying cost significant elements (CSE. The knowledge on CSE of high-rise condominium projects (HRCP is essential as high-rise residential multi-unit projects are the next option in building construction due to limited land areas in urban areas. This study aims to determine the levels of awareness among QS undergraduates of a private university in Malaysia on CSE of HRCP in Malaysia. The respondents’ knowledge on CSE has not achieved a satisfactory level. Both male and female respondents have the same levels of awareness on CSE. Remedial strategies to improve this situation are recommended.

  7. Combining hybrid cars and synthetic fuels with electricity generation and carbon capture and storage

    International Nuclear Information System (INIS)

    Vliet, Oscar van; Broek, Machteld van den; Turkenburg, Wim; Faaij, Andre

    2011-01-01

    We examined the co-evolution of the transportation, and electricity and heat generation sectors in the Netherlands until 2040 using a MARKAL bottom-up cost optimisation model. All scenario variants investigated indicate a switch away from crude oil-based diesel and petrol for transportation. Lowest overall CO 2 abatement cost is achieved by accommodating transportation first and using relatively expensive options for emissions reduction in electricity generation if needed. Biomass and carbon capture and storage (CCS) are used to full potential. Transportation CO 2 emissions are reduced by switching to ethanol or bio-based synthetic fuels combined with CCS, and series hybrid cars if needed. Depending on the availability of biomass and carbon storage capacity, electricity is produced from biomass, coal with CCS, or wind complemented with natural gas. Indirect greenhouse gas emissions rise to 34-54% of national emissions in 2040. The difference in annual investment required between the scenario variants with and without CO 2 emissions reductions of 68% by 2040 is 4-7 billion euro/year, or 0.5-1.2% of projected GDP. Investment costs are mostly determined by the cost of cars and electricity generation capacity. We observe competition for limited biomass supply and CO 2 storage capacity between the transportation and power sectors.

  8. Towards a tipping point in responding to change: rising costs, fewer options for Arctic and global societies.

    Science.gov (United States)

    Huntington, Henry P; Goodstein, Eban; Euskirchen, Eugénie

    2012-02-01

    Climate change incurs costs, but government adaptation budgets are limited. Beyond a certain point, individuals must bear the costs or adapt to new circumstances, creating political-economic tipping points that we explore in three examples. First, many Alaska Native villages are threatened by erosion, but relocation is expensive. To date, critically threatened villages have not yet been relocated, suggesting that we may already have reached a political-economic tipping point. Second, forest fires shape landscape and ecological characteristics in interior Alaska. Climate-driven changes in fire regime require increased fire-fighting resources to maintain current patterns of vegetation and land use, but these resources appear to be less and less available, indicating an approaching tipping point. Third, rapid sea level rise, for example from accelerated melting of the Greenland ice sheet, will create a choice between protection and abandonment for coastal regions throughout the world, a potential global tipping point comparable to those now faced by Arctic communities. The examples illustrate the basic idea that if costs of response increase more quickly than available resources, then society has fewer and fewer options as time passes.

  9. Estimating the cost of saving electricity through U.S. utility customer-funded energy efficiency programs

    International Nuclear Information System (INIS)

    Hoffman, Ian M.; Goldman, Charles A.; Rybka, Gregory; Leventis, Greg; Schwartz, Lisa; Sanstad, Alan H.; Schiller, Steven

    2017-01-01

    The program administrator and total cost of saved energy allow comparison of the cost of efficiency across utilities, states, and program types, and can identify potential performance improvements. Comparing program administrator cost with the total cost of saved energy can indicate the degree to which programs leverage investment by participants. Based on reported total costs and savings information for U.S. utility efficiency programs from 2009 to 2013, we estimate the savings-weighted average total cost of saved electricity across 20 states at $0.046 per kilowatt-hour (kW h), comparing favorably with energy supply costs and retail rates. Programs targeted on the residential market averaged $0.030 per kW h compared to $0.053 per kW h for non-residential programs. Lighting programs, with an average total cost of $0.018 per kW h, drove lower savings costs in the residential market. We provide estimates for the most common program types and find that program administrators and participants on average are splitting the costs of efficiency in half. More consistent, standardized and complete reporting on efficiency programs is needed. Differing definitions and quantification of costs, savings and savings lifetimes pose challenges for comparing program results. Reducing these uncertainties could increase confidence in efficiency as a resource among planners and policymakers. - Highlights: • The cost of saved energy allows comparisons among energy resource investments. • Findings from the most expansive collection yet of total energy efficiency program costs. • The weighted average total cost of saved electricity was $0.046 for 20 states in 2009–2013. • Averages in the residential and non-residential sectors were $0.030 and $0.053 per kW h, respectively. • Results strongly indicate need for more consistent, reliable and complete reporting on efficiency programs.

  10. The impact of cost recovery on electric utilities' Clean Air Act compliance strategies

    International Nuclear Information System (INIS)

    Bensinger, D.L.

    1993-01-01

    By 1995, over 200 electric power plant units in twenty one states must comply with Phase I of the acid rain requirements in Title IV of the 1990 Clean Air Act Amendments (CAAA). By the year 2000, an additional 2200 units must comply with the Title IV. Compliance costs are expected to necessitate significant electricity rate increases. In order to recover their compliance costs, utilities must file rate increase requests with state public utility commissions (PUC's), and undergo a rate proceeding involving public heatings. Because of the magnitude of cost and the complexity of compliance options, including interaction with Titles I and III of the CAAA, extensive PUC reviews of compliance strategies are likely. These reviews could become as adversarial as the nuclear prudence reviews of the 1980's. A lack of understanding of air pollution and the CAA by much of the general public and the flexibility of compliance options creates an environment conducive to adverse public reaction to the cost of complying with the Clean Air Act. Public attitudes toward pollution control technologies will be greatly affected by these hearings, and the early plant hearings will shape the utility rate making process under the Clean Air Act. Inadequate cost recovery due to constrained compliance strategies or adverse hearings could significantly inhibit industry willingness to invest in certain control technologies or advanced combustion technologies. There are already signs that Clean Air Act compliance will be the prudence issue of the 1990's for utilities, even where state statutes mandate particular compliance approaches. Specific actions should be undertaken now by the utility industry to improve the probability of sound cost recovery decisions, preserve compliance options, including multimedia strategies, and avoid the social- and cost-acceptance problems of nuclear power

  11. The external costs of electricity generation. A comparison of environmental damage of silicon photovoltaic electricity, produced with different electricity mixes, vs natural gas and coal

    Energy Technology Data Exchange (ETDEWEB)

    Olson, C.L.; Veltkamp, A.C.; Sinke, W.C. [ECN Solar Energy, Petten (Netherlands)

    2012-09-15

    In this paper the environmental damages of crystalline silicon photovoltaics are calculated, using the most recent photovoltaics data, and compared with those of the prevalent conventional energy technologies. A life cycle assessment of selected environmental impacts of 1kWh of electricity generated by various technologies was performed using Simapro software (version 7.2.4) in conjunction with the Ecoinvent database (version 2.2). The environmental impacts were assessed using the ReCiPe methodology. Because of the important role of coal and natural gas in the global electricity generation portfolio, special attention is given to the comparison of PV with those technologies. The environmental consequences of manufacturing PV modules with renewable, UCTE or 100% coal electricity mixes are explored. A brief update of the estimated monetarization of damages due to coal and climate change is included. A rough estimate of the true cost of coal and PV electricity is made in 2011.

  12. Requirements for low-cost electricity and hydrogen fuel production from multiunit inertial fusion energy plants with a shared driver and target factory

    International Nuclear Information System (INIS)

    Logan, G.B.; Moir, R.W.; Hoffmman, M.A.

    1995-01-01

    The economy of scale for multiunit inertial fusion energy (IFE) power plants is explored based on the molten salt HYLIFE-II fusion chamber concept, for the purpose of producing lower cost electricity and hydrogen fuel. The cost of electricity (CoE) is minimized with a new IFE systems code IFEFUEL5 for a matrix of plant cases with one to eight fusion chambers of 250 to 2000-MW (electric) net output each, sharing a common heavy-ion driver and target factory. Improvements to previous HYLIFE-II models include a recirculating induction linac driver optimized as a function of driver energy and rep-rate (average driver power), inclusion of beam switchyard costs, a fusion chamber cost scaling dependence on both thermal power and fusion yield, and a more accurate bypass pump power scaling with chamber rep-rate. A CoE less than 3 cents/kW(electric)-h is found for plant outputs greater than 2 GW(electric), allowing hydrogen fuel production by wafer electrolysis to provide lower fuel cost per mile for higher efficiency hydrogen engines compared with gasoline engines. These multiunit, multi-GW(electric) IFE plants allow staged utility plant deployment, lower optimum chamber rep-rates, less sensitivity to driver and target fabrication costs, and a CoE possibly lower than future fission, fossil, and solar competitors. 37 refs., 12 figs., 4 tabs

  13. Costs of elephant grass gasification for rural electric power generation; Custos da gaseificacao de graminea para eletrificacao rural

    Energy Technology Data Exchange (ETDEWEB)

    Fernandes, Marcelo Cortes; Sanchez, Caio Glauco; Angulo, Mario Barriga [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica. Dept. de Engenharia Termica e de Fluidos

    2000-07-01

    Biomass gasification is an sustainable option for energy supply, which presents low pollutants emission rate and allows - through the global cycle of growing and consumption of feedstock (vegetables), a balance between consumption and production of carbonic gas, preventing an increase of the carbonic gas levels in the atmosphere. Fluidized bed gasification is a means to increase the energetic use of biomass. A gasifier was built with internal diameter of 400 mm and total height of 4600 mm . The equipment was tested for gasification of elephant-grass (Pennisetum purpureum) at a 100 kg/h rate. It was evaluated an adequate diesel-electric-generator to work at hybrid regime, using 70% biomass gas and 30% diesel. With the equipment's construction costs, could be made a first economic feasibility assessment on the pilot-plant to produce electricity by grass gasification (elephant-grass) at rural communities. The annual cost of the investment was estimated. The cost of electricity was calculated as a function of the capital cost and the diesel price. The methods and equations for economic assessment are presented. This study found values between 0,16 and 0,23 R$/kWh for the produced electricity, what points towards the feasibility of this project. (author)

  14. Methods for Analyzing the Benefits and Costs of Distributed Photovoltaic Generation to the U.S. Electric Utility System

    Energy Technology Data Exchange (ETDEWEB)

    Denholm, P.; Margolis, R.; Palmintier, B.; Barrows, C.; Ibanez, E.; Bird, L.; Zuboy, J.

    2014-09-01

    This report outlines the methods, data, and tools that could be used at different levels of sophistication and effort to estimate the benefits and costs of DGPV. In so doing, we identify the gaps in current benefit-cost-analysis methods, which we hope will inform the ongoing research agenda in this area. The focus of this report is primarily on benefits and costs from the utility or electricity generation system perspective. It is intended to provide useful background information to utility and regulatory decision makers and their staff, who are often being asked to use or evaluate estimates of the benefits and cost of DGPV in regulatory proceedings. Understanding the technical rigor of the range of methods and how they might need to evolve as DGPV becomes a more significant contributor of energy to the electricity system will help them be better consumers of this type of information. This report is also intended to provide information to utilities, policy makers, PV technology developers, and other stakeholders, which might help them maximize the benefits and minimize the costs of integrating DGPV into a changing electricity system.

  15. Methodology for modelling plug-in electric vehicles in the power system and cost estimates for a system with either smart or dumb electric vehicles

    DEFF Research Database (Denmark)

    Kiviluoma, Juha; Meibom, Peter

    2011-01-01

    The article estimates the costs of plug-in electric vehicles (EVs) in a future power system as well as the benefits from smart charging and discharging EVs (smart EVs). To arrive in a good estimate, a generation planning model was used to create power plant portfolios, which were operated in a more...... detailed unit commitment and dispatch model. In both models the charging and discharging of EVs is optimised together with the rest of the power system. Neither the system cost nor the market price of electricity for EVs turned out to be high (36–263 €/vehicle/year in the analysed scenarios). Most...

  16. Economical Feedback of Increasing Fuel Enrichment on Electricity Cost for VVER-1000

    Directory of Open Access Journals (Sweden)

    Mohammed Saad Dwiddar

    2015-08-01

    Full Text Available A methodology of evaluating the economics of the front-end nuclear fuel cycle with a price change sensitivity analysis for a VVER-1000 reactor core as a case study is presented. The effect of increasing the fuel enrichment and its corresponding reactor cycle length on the energy cost is investigated. The enrichment component was found to represent the highly expenses dynamic component affecting the economics of the front-end fuel cycle. Nevertheless, the increase of the fuel enrichment will increase the reactor cycle length, which will have a positive feedback on the electricity generation cost (cent/KWh. A long reactor operation time with a cheaper energy cost set the nuclear energy as a competitive alternative when compared with other energy sources.

  17. Integrating intermittent energy sources in liberalized electricity markets: from technical costs to economic penalties as a result of market rules

    International Nuclear Information System (INIS)

    Menanteau, Ph.; Finon, D.; Lamy, M.L.

    2003-06-01

    With the aim of preventing climatic change and ensuring the security of energy supplies, the recent European Directive on renewable energy production sources is aimed at bringing about a very substantial increase in electricity production from renewable sources in Europe by the 2010 horizon. Generally speaking, production of electricity from renewable sources will be assured by biomass and wind, and to a lesser extent by micro hydro, technologies whose characteristics are very different from the point of view of their integration into the electricity system. Their inclusion in the electricity systems will cause problems because of the intermittent nature of the production, a factor that does not enter into the paradigms of producers, system operators or regulators. The problems raised by the integration of intermittent production are technical in nature (risk of non-availability in peak periods, the need for additional reserves) and will incur adjustment costs, but the way in which the electricity markets function will impose economic penalties generally more substantial than the added technical costs. In this paper are examined in succession: (i) the additional costs raised by intermittence; (ii) the economic penalties imposed by the operating rules of de-regulated electricity markets with electricity production from renewable sources included, with particular reference to the case of the British and Nordic markets; and (iii) an analysis of the options that could limit the gap between the additional cost of intermittent production for the system and the adjustment surcharges imposed by the electricity markets, with the aim of reducing the tension between the deregulation of the electricity market and promoting the development of renewable energy sources. (A.L.B.)

  18. Cost-Benefit Analysis of the Electric Lines Reclamation in Italy

    International Nuclear Information System (INIS)

    Curcuruto, S.; Elia, L.; Franchi, A.; Andreuccetti, D.; D'Amore, M.; Martuzzi, M.; Vecchia, P.

    2001-01-01

    Full text: In Italy is now in preparation a specific decree with the aim to regulate the electromagnetic pollution produced by sources operating at frequency until to 100 kHz; in the application field of the rule, the most important sources are the electric lines and relative plants which operate at 50 Hz frequency. In the respect of the precautionary principle, the Italian approach is to define different reference values to protect the population also by long term effects in addition to acute effects: exposition limits, attention values, quality objectives; respectively, 100 μT, 0.5 μT and 0.2 μT. To support this choice, the Ministry of the Environment asked ANPA, in co-operation with other bodies at national level, to produce a study about the costs of the necessary reclamation measures on the electric lines to respect the new limits and their comparison with the expected sanitary benefits. Only the leukaemia cases are considered to estimate the sanitary benefits; for the costs, the technical solutions more frequently adopted by the managers of the lines and the plants have been evaluated. This report shows the results of the study, which presents as element of weakness a knowledge of the exposed Italian population at different levels of magnetic field that cannot be truly representative. (author)

  19. CO{sub 2} mitigation costs of large-scale bioenergy technologies in competitive electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Gustavsson, L [Mid-Sweden University, Ostersund (Sweden). Dept. of Natural and Environmental Sciences, Ecotechnology; Madlener, R [Swiss Federal Institute of Technology, Zurich (Switzerland). CEPE

    2003-11-01

    In this study, we compare and contrast the impact of recent technological developments in large biomass-fired and natural-gas-fired cogeneration and condensing plants in terms of CO{sub 2} mitigation costs and under the conditions of a competitive electricity market. The CO{sub 2} mitigation cost indicates the minimum economic incentive required (e.g. in the form of a carbon tax) to equal the cost of a less carbon extensive system with the cost of a reference system. The results show that CO{sub 2} mitigation costs are lower for biomass systems than for natural gas systems with decarbonization. However, in liberalized energy markets and given the sociopolitical will to implement carbon extensive energy systems, market-based policy measures are still required to make biomass and decarbonization options competitive and thus help them to penetrate the market. This cost of cogeneration plants, however, depends on the evaluation method used. If we account for the limitation of heat sinks by expanding the reference entity to include both heat and power, as is typically recommended in life-cycle analysis, then the biomass-based gasification combined cycle (BIG/CC) technology turns out to be less expensive and to exhibit lower CO{sub 2} mitigation costs than biomass-fired steam turbine plants. However, a heat credit granted to cogeneration systems that is based on avoided cost of separate heat production, puts the steam turbine technology despite its lower system efficiency at an advantage. In contrast, when a crediting method based on avoided electricity production in natural gas fired condensing plants is employed, the BIG/CC technology turns out to be more cost competitive than the steam turbine technology for carbon tax levels beyond about $150/t C. Furthermore, steam turbine plants are able to compete with natural gas fired cogeneration plants at carbon tax levels higher than about $90/tC. (author)

  20. Transmission cost minimization strategies for wind-electric generating facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, R. [Northern States Power Company, Minneapolis, MN (United States)

    1997-12-31

    Integrating wind-electric generation facilities into existing power systems presents opportunities not encountered in conventional energy projects. Minimizing outlet cost requires probabilistic value-based analyses appropriately reflecting the wind facility`s operational characteristics. The wind resource`s intermittent nature permits relaxation of deterministic criteria addressing outlet configuration and capacity required relative to facility rating. Equivalent capacity ratings of wind generation facilities being a fraction of installed nameplate rating, outlet design studies contingency analyses can concentrate on this fractional value. Further, given its non-dispatchable, low capacity factor nature, a lower level of redundancy in outlet facilities is appropriate considering the trifling contribution to output unreliability. Further cost reduction opportunities arise from {open_quotes}wind speed/generator power output{close_quotes} and {open_quotes}wind speed/overhead conductor rating{close_quotes} functions` correlation. Proper analysis permits the correlation`s exploitation to safely increase line ratings. Lastly, poor correlation between output and utility load may permit use of smaller conductors, whose higher (mostly off-peak) losses are economically justifiable.

  1. The Lebanese electricity system in the context of sustainable development

    International Nuclear Information System (INIS)

    El-Fadel, R.H.; Hammond, G.P.; Harajli, H.A.; Jones, C.I.; Kabakian, V.K.; Winnett, A.B.

    2010-01-01

    The Lebanese electricity system has been evaluated in terms of its sustainability. An integrated approach was adopted to assess the life-cycle technical, environmental, energy and economic attributes of the system. The findings show that the Lebanese electricity system is characterized by a weak performance in all analysed aspects related to the sustainability of energy systems. Specifically, the system lacks adequacy and security leading to a supply-demand deficit and poor diversity. It gives rise to significant environmental emissions (including green-house gases), and produces large economic inefficiencies. The costs and benefits of optimising the performance of the centralised electricity system are presented, indicating substantial net benefits (together with considerable benefits in reduced environmental impacts across the life-cycle assessment categories, including carbon emissions) from improving the transmission and distribution networks, upgrading existing conventional plants to their design standards, and shifting towards the use of natural gas. The expected levelised cost of various energy sources in Lebanon also indicates that renewable energy sources are competitive alternatives at the present time.

  2. Cost and quality gains from diversification and vertical integration in the electricity industry: A DEA approach

    International Nuclear Information System (INIS)

    Arocena, Pablo

    2008-01-01

    This paper analyzes the degree of economies of vertical integration, diversification and scale in the electricity industry by means of Data Envelopment Analysis. We estimate the impact that alternative forms of unbundling would have on the cost and quality of supply, measured as the number and duration of supply interruptions, in a group of Spanish electric utilities. We find evidence of the existence of cost and quality gains from integrating power generation and distribution in the range of 1.1 to 4.9%, whereas diversifying the source of power generation saves between 1.3 and 4.3% of costs and quality. Finally, the scale efficiency of the largest utilities could be improved by dividing them into smaller units, provided that their current vertical scope and generation-mix are preserved. (author)

  3. Cost and quality gains from diversification and vertical integration in the electricity industry: A DEA approach

    Energy Technology Data Exchange (ETDEWEB)

    Arocena, Pablo [Universidad Publica de Navarra, Dpto. Gestion de Empresas, Campus de Arrosadia, 31006 Pamplona (Spain)

    2008-01-15

    This paper analyzes the degree of economies of vertical integration, diversification and scale in the electricity industry by means of Data Envelopment Analysis. We estimate the impact that alternative forms of unbundling would have on the cost and quality of supply, measured as the number and duration of supply interruptions, in a group of Spanish electric utilities. We find evidence of the existence of cost and quality gains from integrating power generation and distribution in the range of 1.1 to 4.9%, whereas diversifying the source of power generation saves between 1.3 and 4.3% of costs and quality. Finally, the scale efficiency of the largest utilities could be improved by dividing them into smaller units, provided that their current vertical scope and generation-mix are preserved. (author)

  4. Estimation of cost-effectiveness of the Finnish electricity distribution utilities

    International Nuclear Information System (INIS)

    Kopsakangas-Savolainen, Maria; Svento, Rauli

    2008-01-01

    This paper examines the cost-effectiveness of Finnish electricity distribution utilities. We estimate several panel data stochastic frontier specifications using both Cobb-Douglas and Translog model specifications. The conventional models are extended in order to model observed heterogeneity explicitly in the cost frontier models. The true fixed effects model has been used as a representative of the models which account for unobserved heterogeneity and extended conventional random effect models have been used in analysing the impact of observed heterogeneity. A comparison between the conventional random effects model and models where heterogeneity component is entered either into the mean or into the variance of the inefficiency term shows that relative efficiency scores diminish when heterogeneity is added to the analysis. The true fixed effects model on the other hand gives clearly smaller inefficiency scores than random effects models. In the paper we also show that the relative inefficiency scores and rankings are not sensitive to the cost function specification. Our analysis points out the importance of the efficient use of the existing distribution network. The economies of scale results suggest that firms could reduce their operating costs by using networks more efficiently. According to our results average size firms which have high load factors are the most efficient ones. All firms have unused capacities so that they can improve cost-effectiveness rather by increasing the average distributed volumes than by mergers

  5. Estimation of cost-effectiveness of the Finnish electricity distribution utilities

    Energy Technology Data Exchange (ETDEWEB)

    Kopsakangas-Savolainen, Maria; Svento, Rauli [Department of Economics, University of Oulu (Finland)

    2008-03-15

    This paper examines the cost-effectiveness of Finnish electricity distribution utilities. We estimate several panel data stochastic frontier specifications using both Cobb-Douglas and Translog model specifications. The conventional models are extended in order to model observed heterogeneity explicitly in the cost frontier models. The true fixed effects model has been used as a representative of the models which account for unobserved heterogeneity and extended conventional random effect models have been used in analysing the impact of observed heterogeneity. A comparison between the conventional random effects model and models where heterogeneity component is entered either into the mean or into the variance of the inefficiency term shows that relative efficiency scores diminish when heterogeneity is added to the analysis. The true fixed effects model on the other hand gives clearly smaller inefficiency scores than random effects models. In the paper we also show that the relative inefficiency scores and rankings are not sensitive to the cost function specification. Our analysis points out the importance of the efficient use of the existing distribution network. The economies of scale results suggest that firms could reduce their operating costs by using networks more efficiently. According to our results average size firms which have high load factors are the most efficient ones. All firms have unused capacities so that they can improve cost-effectiveness rather by increasing the average distributed volumes than by mergers. (author)

  6. Cost Behavior

    DEFF Research Database (Denmark)

    Hoffmann, Kira

    The objective of this dissertation is to investigate determinants and consequences of asymmetric cost behavior. Asymmetric cost behavior arises if the change in costs is different for increases in activity compared to equivalent decreases in activity. In this case, costs are termed “sticky......” if the change is less when activity falls than when activity rises, whereas costs are termed “anti-sticky” if the change is more when activity falls than when activity rises. Understanding such cost behavior is especially relevant for decision-makers and financial analysts that rely on accurate cost information...... to facilitate resource planning and earnings forecasting. As such, this dissertation relates to the topic of firm profitability and the interpretation of cost variability. The dissertation consists of three parts that are written in the form of separate academic papers. The following section briefly summarizes...

  7. Optimal Charging of Electric Vehicles with Trading on the Intraday Electricity Market

    Directory of Open Access Journals (Sweden)

    Ilham Naharudinsyah

    2018-06-01

    Full Text Available Trading on the energy market is a possible way to reduce the electricity costs of charging electric vehicles at public charging stations. In many European countries, it is possible to trade electricity until shortly before the period of delivery on so called intraday electricity markets. In the present work, the potential for reducing the electricity costs by trading on the intraday market is investigated using the example of the German market. Based on simulations, the authors reveal that by optimizing the charging schedule together with the trading on the intraday electricity market, the costs can be reduced by around 8% compared to purchasing all the required energy from the energy supplier. By allowing the charging station operator to resell the energy to the intraday electricity market, an additional cost reduction of around 1% can be achieved. Besides the potential cost savings, the impacts of the trading unit and of the lead time of the intraday electricity market on the costs are investigated. The authors reveal that the achievable electricity costs can be strongly affected by the lead time, while the trading unit has only a minor effect on the costs.

  8. A Low Cost and High Speed Electrical Capacitance Tomography System Design

    Directory of Open Access Journals (Sweden)

    Ruzairi ABDUL RAHIM

    2010-03-01

    Full Text Available Electrical capacitance tomography system is a system which can be used for imaging industrial multi-component processes involving non-conducting fluids in pipelines. In order to make an ECT system applicable in all kinds of industries, the cost factor of building an ECT system is essential. In this research, we focus on reducing the cost of the system while not affecting the quality of the results. In the past, most of the researches in tomography system have concentrated more on the design of the sensor, and use DAS card as the interface to the PC. This will increase the cost of the system. In this case, the cost of the data acquisition system will be needed to be taken into consideration. To develop a low cost and fast data acquisition system, a Universal Serial Bus (USB is found to be the most ideal technology. In order to further reduce the cost of the ECT system, a very low cost material, aluminium plates are used as the electrodes of the system. The information obtained in the PC will be reconstructed using iterative algorithm in order to obtain a precise image of the flow in the pipeline. The information obtained from the system will be useful for the purpose of controlling the flow in the pipeline.

  9. The Market Value and Cost of Solar Photovoltaic Electricity Production

    OpenAIRE

    Borenstein, Severin

    2008-01-01

    The high cost of power from solar photovoltaic (PV) panels has been a major deterrent to the technology’s market penetration. Proponents have argued, however, that typical analyses overlook many of the benefits of solar PV. Some of those benefits are in the realm of environmental and security externalities, but others occur within the electricity markets. In this paper, I attempt to do a more complete market valuation of solar PV. I incorporate the fact that power from solar PV panels is gene...

  10. An Enterprise Model of Rising Ship Costs: Loss of Learning Due to Time between Ships and Labor Force Instability

    OpenAIRE

    Summerville, Jessica R.; Cullis, Bethia L.; Druker, Eric R.; Rutledge, Gabriel B.; Braxton, Peter J.; Coleman, Richard L.

    2007-01-01

    Proceedings Paper (for Acquisition Research Program) Since the end of the Cold War, the perceived need for Navy ships has dropped, and so the shipbuilding budget has dropped. Seemingly coincidental with this budgetary pressure, and perversely aggravating the problem, ship costs began to rise steeply. We will set aside that ships have grown in weight by about three percent per year since World War II and that ever-more weapon systems are being put into them, and confine ourselves to discu...

  11. Least cost, utility scale abatement from Australia's NEM (National Electricity Market). Part 2: Scenarios and policy implications

    International Nuclear Information System (INIS)

    Brear, M.J.; Jeppesen, M.; Chattopadhyay, D.; Manzie, C.; Alpcan, T.; Dargaville, R.

    2016-01-01

    This paper is the second of a two part study that considers least cost, greenhouse gas abatement pathways for an electricity system. Part 1 of this study formulated a model for determining these abatement pathways, and applied this model to Australia's NEM (National Electricity Market) for a single reference scenario. Part 2 of this study applies this model to different scenarios and considers the policy implications. These include cases where nuclear power generation and CCS (carbon capture and storage) are implemented in Australia, which is presently not the case, as well as a more detailed examination of how an extended, RPS (renewable portfolio standard) might perform. The effect of future fuel costs and different discount rates are also examined. Several results from this study are thought to be significant. Most importantly, this study suggests that Australia already has utility scale technologies, renewable and non-renewable resources, an electricity market design and an abatement policy that permit continued progress towards deep greenhouse gas abatement in its electricity sector. In particular, a RPS (renewable portfolio standard) appears to be close to optimal as a greenhouse gas abatement policy for Australia's electricity sector for at least the next 10–15 years. - Highlights: • Considers scenarios and policy implications for Australia's NEM (National Electricity Market). • An extended form of RPS (renewable portfolio standard) appears near optimal until roughly 2030. • For up to 80% abatement, the inclusion of nuclear achieves only marginal benefit by 2050. • CCS (Carbon capture and storage) does not appear competitive with current cost estimates.

  12. Analyzing the Effects of the Iranian Energy Subsidy Reform Plan on Short- Run Marginal Generation Cost of Electricity Using Extended Input-Output Price Model

    Directory of Open Access Journals (Sweden)

    Zohreh Salimian

    2012-01-01

    Full Text Available Subsidizing energy in Iran has imposed high costs on country's economy. Thus revising energy prices, on the basis of a subsidy reform plan, is a vital remedy to boost up the economy. While the direct consequence of cutting subsidies on electricity generation costs can be determined in a simple way, identifying indirect effects, which reflect higher costs for input factors such as labor, is a challenging problem. In this paper, variables such as compensation of employees and private consumption are endogenized by using extended Input-Output (I-O price model to evaluate direct and indirect effects of electricity and fuel prices increase on economic subsectors. The determination of the short-run marginal generation cost of electricity using I-O technique with taken into account the Iranian targeted subsidy plan's influences is the main goal of this paper. Marginal cost of electricity, in various scenarios of price adjustment of energy, is estimated for three conventional categories of thermal power plants. Our results show that the raising the price of energy leads to an increase in the electricity production costs. Accordingly, the production costs will be higher than 1000 Rials per kWh until 2014 as predicted in the beginning of the reform plan by electricity suppliers.

  13. Energy Transition-Index Germany. Costs are increasing steadily; Energiewende-Index Deutschland. Die Kosten steigen weiter

    Energy Technology Data Exchange (ETDEWEB)

    Vahlenkamp, Thomas; Kropeit, Julia [McKinsey and Company, Duesseldorf (Germany); Ritzenhofen, Ingmar [McKinsey and Company, Koeln (Germany); Gersema, Gerke [McKinsey and Company, Hamburg (Germany)

    2017-03-15

    How expensive the energy transition truly will be? The question of costs is coming more and more into the focus: The Bundesrechnungshof calls for more transparency, the policy confronted with the complexity of the subject matter is not able to quantify concrete costs. At the same time, all participants are working to curb spending growth. The fact is, the total costs will continue to rise. It is already foreseeable that by 2025 the annual electricity costs will increase by Euro 14 billion - to then Euro 77 billion. The main drivers are grid charges and rising fuel costs. [German] Wie teuer wird die Energiewende wirklich? Die Frage nach den Kosten geraet zunehmend in den Fokus: Der Bundesrechnungshof fordert mehr Transparenz, die Politik sieht sich mit Blick auf die Komplexitaet der Thematik ausserstande, konkrete Kosten zu beziffern. Gleichzeitig treten alle Beteiligten dafuer ein, die Ausgabenentwicklung zu bremsen. Fakt ist: Die Gesamtkosten werden weiter steigen. Bereits heute ist absehbar, dass sich bis 2025 die jaehrlich anfallenden Stromkosten um 14 Mrd. Euro erhoehen werden - auf dann 77 Mrd. Euro. Haupttreiber sind die Netzentgelte und steigende Brennstoffkosten.

  14. Electricity generation projections of the world and Brazil

    International Nuclear Information System (INIS)

    Dias, Marcio Soares

    2002-01-01

    The world use of electricity is projected to increase by 9,570 billions kWh over a span of 20 years. Natural gas is expected to account for the largest increment in electricity generation. As a result of high oil and natural gas consumption fuel prices are projected to rise in nominal dollars over the forecast horizon. Higher capacity utilisation and fewer expected retirements of running nuclear plants have resulted in a revision of EIA's projected consumption of electricity from nuclear power. Projection of 3.6%/year in the electricity consumption in Brazil is lower than the historical correlation given by the GDP (5%) growth rate plus 1.2 to 1.7%. GDP and energy consumption growth rates for Brazil are projected to be higher than the world value, but are lower than the projected values for countries like Mexico and China. Trends in primary fuel prices and external dependence on fuel supply are important factors for the Brazilian investments on electricity generation due their impact on costs and standard of living. (author)

  15. Estimating deficit probabilities with price-responsive demand in contract-based electricity markets

    International Nuclear Information System (INIS)

    Galetovic, Alexander; Munoz, Cristian M.

    2009-01-01

    Studies that estimate deficit probabilities in hydrothermal systems have generally ignored the response of demand to changing prices, in the belief that such response is largely irrelevant. We show that ignoring the response of demand to prices can lead to substantial over or under estimation of the probability of an energy deficit. To make our point we present an estimation of deficit probabilities in Chile's Central Interconnected System between 2006 and 2010. This period is characterized by tight supply, fast consumption growth and rising electricity prices. When the response of demand to rising prices is acknowledged, forecasted deficit probabilities and marginal costs are shown to be substantially lower

  16. Higher profits, lower bills : a new electricity strategy for Hydro-Quebec

    International Nuclear Information System (INIS)

    2010-01-01

    Quebec is the fourth largest producer of hydro-electricity in the world, and has among the lowest electricity rates in North America. In 2008, 89 percent of the electricity produced by Hydro-Quebec was sold in the province, and the remainder was exported. In 2009, the electric utility released its strategic plan for 2009 to 2013. Hydro-Quebec's net profits are forecast to decline by 24 percent by 2013 and electricity rates are forecast to rise by 8.5 percent. Since Hydro-Quebec has already developed all of the province's low-cost hydroelectric resources, it can no longer increase profits and lower rates by building new hydropower production stations. In order to continue to prosper, the utility will invest in energy efficiency and better coordination of its power system with Ontario's. Increased electricity exports from Hydro-Quebec will help both Ontario and the United States reduce their greenhouse gas emissions by displacing fossil power generation. 25 refs., 2 tabs., 3 figs.

  17. Electric power production contra electricity savings

    International Nuclear Information System (INIS)

    Schleisner, L.; Grohnheit, P.E.; Soerensen, H.

    1991-01-01

    The expansion of electricity-producing plants has, in Denmark until now, taken place in accordance with the demand for electricity. Recently, it has been suggested that the cost of the further development of such systems is greater than the cost of instigating and carrying out energy conservation efforts. The aim of the project was to evaluate the consequences for power producing plants of a reduction of the electricity consumption of end-users. A method for the analysis of the costs involved in the system and operation of power plants contra the costs that are involved in saving electricity is presented. In developing a model of this kind, consideration is given to the interplay of the individual saving project and the existing or future electricity supply. Thus it can be evaluated to what extent it would be advisable to substitute investments in the development of the capacity of the power plants with investments in the reduction of electricity consumption by the end users. This model is described in considerable detail. It will be tested in representative situations and locations throughout the Nordic countries. (AB) 17 refs

  18. A novel evaluation of heat-electricity cost allocation in cogenerations based on entropy change method

    International Nuclear Information System (INIS)

    Ye, Xuemin; Li, Chunxi

    2013-01-01

    As one of the most significant measures to improve energy utilization efficiency and save energy, cogeneration or combined heat and power (CHP) has been widely applied and promoted with positive motivations in many countries. A rational cost allocation model should indicate the performance of cogenerations and balance the benefits between electricity generation and heat production. Based on the second law of thermodynamics, the present paper proposes an entropy change method for cost allocation by choosing exhaust steam entropy as a datum point, and the new model works in conjunction with entropy change and irreversibility during energy conversion processes. The allocation ratios of heat cost with the present and existing methods are compared for different types of cogenerations. Results show that the allocation ratios with the entropy change method are more rational and the cost allocation model can make up some limitations involved in other approaches. The future energy policies and innovational directions for cogenerations and heat consumers should be developed. - Highlights: • A rational model of cogeneration cost allocation is established. • Entropy change method integrates the relation of entropy change and exergy losses. • The unity of measuring energy quality and quantity is materialized. • The benefits between electricity generation and heat production are balanced

  19. Rising Long-term Interest Rates

    DEFF Research Database (Denmark)

    Hallett, Andrew Hughes

    Rather than chronicle recent developments in European long-term interest rates as such, this paper assesses the impact of increases in those interest rates on economic performance and inflation. That puts us in a position to evaluate the economic pressures for further rises in those rates......, the first question posed in this assignment, and the scope for overshooting (the second question), and then make some illustrative predictions of future interest rates in the euro area. We find a wide range of effects from rising interest rates, mostly small and mostly negative, focused on investment...... till the emerging European recovery is on a firmer basis and capable of overcoming increases in the cost of borrowing and shrinking fiscal space. There is also an implication that worries about rising/overshooting interest rates often reflect the fact that inflation risks are unequally distributed...

  20. Rising energy prices and the economics of water in agriculture

    NARCIS (Netherlands)

    Zilberman, D.; Sproul, T.; Rajagopal, D.; Sexton, S.; Hellegers, P.J.G.J.

    2008-01-01

    Rising energy prices will alter water allocation and distribution. Water extraction and conveyance will become more costly and demand for hydroelectric power will grow. The higher cost of energy will substantially increase the cost of groundwater, whereas increasing demand for hydroelectric power

  1. Electricity to natural gas competition under customer-side technological change: a marginal cost pricing analysis

    International Nuclear Information System (INIS)

    Gulli', Francesco

    2004-01-01

    This paper aims at evaluating the impact of technological change (on the customer side of the meter) on the network energy industry (electricity and natural gas). The performances of the small gas fired power technologies and the electrical reversible heat pumps have improved remarkably over the last ten years, making possible (or more viable) two opposite technological trajectories: the fully gas-based system, based on the use of small CHP (combined heat and power generation) plants, which would involve a wide decentralisation of energy supply; the fully electric-based system, based on the use of reversible electric heat pumps, which would imply increasing centralisation of energy supply. The analysis described in this paper attempts to evaluate how these two kinds of technological solutions can impact on inter-service competition when input prices are ste equals to marginal costs of supply in each stage of the electricity and natural gas industries. For this purpose, unbundled prices over time and over space are simulated. In particular the paper shows that unbundling prices over space in not very important in affecting electricity to natural gas competition and that, when prices are set equal to long-run marginal costs, the fully electric-based solution (the reversible heat pump) is by far preferable to the fully gas-based solution (the CHP gas fired small power plant). In consequence, the first best outcome of the technological change would involve increasing large power generation and imported (from the utility grid) electricity consumption. Given this framework, we have to ask ourselves why operators, regulators and legislators are so optimistic about the development of the fully gas-based solutions. In this respect, the paper suggests that market distortions (such as market power, energy taxation and inefficient pricing regulation) might have give an ambiguous representation of the optimal technological trajectory, inducing to overestimate the social value

  2. Prices on electricity and transmission of electricity

    International Nuclear Information System (INIS)

    2002-01-01

    This publication contains data on prices of electric energy and transmission of electricity valid on 1 January 2002. The purpose is to illustrate the price changes on the electricity market in terms of prices for different customer categories. All companies holding network concessions for areas and all companies trading in electricity are included in this report, which is produced on an annual basis. The prices for transmission services 1 January 2002 were on the whole unchanged compared to the preceding year. For households the mean annual cost was SEK 856 for flats, SEK 4,194 one- or two-family houses with electric heating and SEK 1,881 without electric heating. (1 SEK ∼ 0.1 USD). Electricity prices rose considerably on 1 January 2002 compared to the year before. The mean price per kWh for households according to standard agreement was SEK 0.356 for deliveries to flats, SEK 0.296 for apartments in one- or two-family houses with electric heating and SEK 0.316 without electric heating. That means that the mean annual cost increased by SEK 171 for flats. For one- or two-family houses with electric heating, costs increased by SEK 1,424, and by SEK 379 for those houses without electric heating. The high costs of electricity may be explained in part by the development on the Nordic Power Exchange (Nord Pool), where the spot price increased by 75 per cent during 2001. The price development for household customers during 1996-2002 is shown in a diagram

  3. Availability of Biomass Residues for Co-Firing in Peninsular Malaysia: Implications for Cost and GHG Emissions in the Electricity Sector

    OpenAIRE

    W. Michael Griffin; Jeremy Michalek; H. Scott Matthews; Mohd Nor Azman Hassan

    2014-01-01

    Fossil fuels comprise 93% of Malaysia’s electricity generation and account for 36% of the country’s 2010 Greenhouse Gas (GHG) emissions. The government has targeted the installation of 330 MW of biomass electricity generation capacity by 2015 to avoid 1.3 Mt of CO 2 emissions annually and offset some emissions due to increased coal use. One biomass option is to co-fire with coal, which can result in reduced GHG emissions, coal use, and costs of electricity. A linear optimization cost model wa...

  4. Influence of wind power, plug-in electric vehicles, and heat storages on power system investments

    International Nuclear Information System (INIS)

    Kiviluoma, Juha; Meibom, Peter

    2010-01-01

    Due to rising fuel costs, the substantial price for CO 2 emissions and decreasing wind power costs, wind power might become the least expensive source of power for an increasing number of power systems. This poses the questions of how wind power might change optimal investments in other forms of power production and what kind of means could be used to increase power system flexibility in order to incorporate the variable power production from wind power in a cost-effective manner. We have analysed possible effects using an investment model that combines heat and power production and simulates electric vehicles. The model runs in an hourly time scale in order to accommodate the impact of variable power production from wind power. Electric vehicles store electricity for later use and can thus serve to increase the flexibility of the power system. Flexibility can also be upgraded by using heat storages with heat from heat pumps, electric heat boilers and combined heat and power (CHP) plants. Results show that there is great potential for additional power system flexibility in the production and use of heat. (author)

  5. Transmission cost allocation for an efficient tariff action of electricity in a liberalised market

    International Nuclear Information System (INIS)

    Bassi, C.; Caldon, R.; Lorenzoni, A.

    1999-01-01

    The work is focused on the evaluation of the costs of an electricity transmission system operator and on their allocation among the users of the grid in liberalized market. After a recall of the goals of an efficient tariff for transmission, an original method for the cost allocation is proposed called ZI. Based on the marginal cost approach, this method could be the base for setting an efficient transmission tariff that at the same time covers costs and stimulates efficient behaviours. The performances of such an approach have been tested on a real 47 bus grid and ZI tariffs have been compared to the traditional postage stamp ones, highlighting the strong differences between them [it

  6. A Cost-Effective Electric Vehicle Charging Method Designed For Residential Homes with Renewable Energy

    Science.gov (United States)

    Lie, T. T.; Liang, Xiuli; Haque, M. H.

    2015-03-01

    Most of the electrical infrastructure in use around the world today is decades old, and may be illsuited to widespread proliferation of personal Electric Vehicles (EVs) whose charging requirements will place increasing strain on grid demand. In order to reduce the pressure on the grid and taking benefits of off peak charging, this paper presents a smart and cost effective EV charging methodology for residential homes equipped with renewable energy resources such as Photovoltaic (PV) panels and battery. The proposed method ensures slower battery degradation and prevents overcharging. The performance of the proposed algorithm is verified by conducting simulation studies utilizing running data of Nissan Altra. From the simulation study results, the algorithm is shown to be effective and feasible which minimizes not only the charging cost but also can shift the charging time from peak value to off-peak time.

  7. Availability of Biomass Residues for Co-Firing in Peninsular Malaysia: Implications for Cost and GHG Emissions in the Electricity Sector

    Directory of Open Access Journals (Sweden)

    W. Michael Griffin

    2014-02-01

    Full Text Available Fossil fuels comprise 93% of Malaysia’s electricity generation and account for 36% of the country’s 2010 Greenhouse Gas (GHG emissions. The government has targeted the installation of 330 MW of biomass electricity generation capacity by 2015 to avoid 1.3 Mt of CO2 emissions annually and offset some emissions due to increased coal use. One biomass option is to co-fire with coal, which can result in reduced GHG emissions, coal use, and costs of electricity. A linear optimization cost model was developed using seven types of biomass residues for Peninsular Malaysia. Results suggest that about 12 Mt/year of residues are available annually, of which oil-palm residues contribute 77%, and rice and logging residues comprise 17%. While minimizing the cost of biomass and biomass residue transport, co-firing at four existing coal plants in Peninsular Malaysia could meet the 330 MW biomass electricity target and reduce costs by about $24 million per year compared to coal use alone and reduces GHG emissions by 1.9 Mt of CO2. Maximizing emissions reduction for biomass co-firing results in 17 Mt of CO2 reductions at a cost of $23/t of CO2 reduced.

  8. Electric energy costs and firm productivity in the countries of the Pacific Alliance

    Science.gov (United States)

    Camacho, Anamaria

    This paper explores the relation between energy as an input of production and firm-level productivity for Chile, Colombia, Mexico and Peru, all country members of the Pacific Alliance economic bloc. The empirical literature, has explored the impact of infrastructure on productivity; however there is limited analysis on the impact of particular infrastructure variables, such as energy, on productivity at the firm level in Latin America. Therefore, this study conducts a quantitative assessment of the responsiveness of productivity to energy cost and quality for Chile, Colombia, Mexico and Peru. For this, the empirical strategy is to estimate a Cobb-Douglas production function using the World Bank's Enterprise Survey to obtain comparable measures of output and inputs of production. This approach provides estimates of input factor elasticities for all of the factors of production including energy. The results indicate that electric energy costs explain cross-country differences in firm level productivity. For the particular case of Colombia, the country exhibits the lowest capital and labor productivity of the PA, and firm output is highly responsive to changes in energy use. As a result, the evidence suggests that policies reducing electric energy costs are an efficient alternative to increase firm performance, particularly in the case of Colombia.

  9. The cost benefit analysis of implementing photovoltaic solar system in the state of Kuwait

    International Nuclear Information System (INIS)

    Ramadhan, Mohammad; Naseeb, Adel

    2011-01-01

    In addition to the high financial cost of energy resources required to meet the rising demand for electricity consumption in Kuwait, the negative environmental impact of fossil fuel is increasing. Hence, the objective of this paper is to determine the economic feasibility and viability of implementing PV solar energy in the State of Kuwait. It was found that the positive characteristics of solar radiation in Kuwait play a critical role in enhancing the feasibility of implementing solar systems. Under the present price of 5$/W and 15% efficiency, the LCOE of a 1 MW station is estimated to be around $0.20/kWh. This LCOE can be feasible only when the cost of oil is around 100$/barrel. The Cost Benefit Analysis showed that when the value of saved energy resources used in producing traditional electricity, and the cost of lowering CO 2 emissions are accounted for, the true economic cost of LCOE of a PV system will decline significantly. The preliminary economic analysis recommends the implementation of PV technology in Kuwait. (author)

  10. Cost-optimal electricity systems with increasing renewable energy penetration for islands across the globe

    NARCIS (Netherlands)

    Blok, K.; van Velzen, Leonore

    2018-01-01

    Cost-optimal electricity system configurations with increasing renewable energy penetration were determined in this article for six islands of different geographies, sizes and contexts, utilizing photovoltaic energy, wind energy, pumped hydro storage and battery storage. The results of the

  11. Managing the output of intermittent sources of electricity: Managers of distribution networks at the center of smart grids

    International Nuclear Information System (INIS)

    Gallean, Gilles

    2013-01-01

    A literal revolution is under way in electricity grids owing to: the rapid decentralized production of electricity, the emergence of an active management of demand, the announcement of new means of storage, and the development of new uses, such as electric vehicles. These changes will gradually happen, differently depending on the country and region; but they will combine to form a system that, to be managed, will call for more intelligence, robots and electronics. At the junction between the production and consumption of electricity, distribution network managers must oversee the new system's technical complexity, limit rising costs and guarantee the quality of the services expected by clients

  12. Electricity production costs of wind power and photovoltaic plants. A re-assessment; Stromgestehungskosten von Windkraft- und Photovoltaikanlagen. Eine Neubewertung

    Energy Technology Data Exchange (ETDEWEB)

    Bode, Sven [arrhenius Institut fuer Energie- und Klimapolitik, Hamburg (Germany)

    2014-06-15

    Over the past few months a number of studies on the future development of the electricity production costs associated with the various green electricity production technologies have been presented, contributing to the discussion on the costs of the energy turnaround and the consequent necessity to amend the German Renewable Energy Law (EEG). However, the calculation base used in these cost surveys deserves questioning. More preferable would be a broadly based model which also takes account of systemic effects. This should also provide the basis for political decisions on the further course of development of renewable energy.

  13. Design of a low-cost thermoacoustic electricity generator and its experimental verification

    Energy Technology Data Exchange (ETDEWEB)

    Backhaus, Scott N [Los Alamos National Laboratory; Yu, Z [UNIV OF MANCHESTER; Jaworski, A J [UNIV OF MANCHESTER

    2010-01-01

    This paper describes the design and testing of a low cost thermoacoustic generator. A travelling-wave thermoacoustic engine with a configuration of a looped-tube resonator is designed and constructed to convert heat to acoustic power. A commercially available, low-cost loudspeaker is adopted as the alternator to convert the engine's acoustic power to electricity. The whole system is designed using linear thermoacoustic theory. The optimization of different parts of the thermoacoustic generator, as well as the matching between the thermoacoustic engine and the alternator are discussed in detail. A detailed comparison between the preliminary test results and linear thermoacoustic predictions is provided.

  14. Impact of Auxiliary Equipments Consumption on Electricity Generation Cost in Selected Power Plants of Pakistan

    Directory of Open Access Journals (Sweden)

    DILEEP KUMAR

    2017-04-01

    Full Text Available This study focuses on higher generation cost of electricity in selected TPPs (Thermal Power Plants in Sindh, Pakistan. It also investigates the energy consumed by the auxiliary equipment of the selected TPPs in Sindh, Pakistan. The AC (Auxiliary Consumption of selected TPPs is compared with that in UK and other developed countries. Results show that the AC in selected TPPs in Sindh, Pakistan exceeds the average AC of the TPPs situated in developed countries. Many energy conservation measures such as impeller trimming and de-staging, boiler feed pump, high voltage inverter, variable frequency drive, and upgrading the existing cooling tower fan blades with fiber reinforced plastic are discussed to overcome higher AC. This study shows that harnessing various available energy conservative measures the AC and unit cost can be reduced by 4.13 and 8.8%; also adverse environmental impacts can be mitigated. Results show that the unit cost of electricity can be reduced from Rs.20 to19/kWh in JTPP (Jamshoro Thermal Power Plant, Rs.9 to 8.8/kWh in GTPS (Gas Turbine Power Station Kotri and Rs. 11 to 10.27/ kWh in LPS (Lakhara Power Station. Thus, electricity production can be improved with the existing capacity, which will eventually assist to manage the current energy crisis and ensure its conservation

  15. We can forget about cheaper electricity

    International Nuclear Information System (INIS)

    Marcan, P.

    2007-01-01

    It has happened again. At the end of the year as a kind of Christmas present the 2008 energy prices were published. But not everyone will benefit from the cabinet's interventions during negotiations with Slovak producers and major electricity suppliers. This year, households benefited from the zero price increase and in 2008 it will once again be households that will benefit from a lower increase rate. For companies, electricity prices will rise by over 10% next year. This is a paradoxical situation as in the corporate sector the traditional regional suppliers already have competition. But in the future the number of competitors should decrease. Mainly the smaller ones may disappear as the Ministry of Economy keeps changing the rules and these changes cost money. The newly introduced export charge or supervision over auctions organized by commercial electricity producers will not help to increase the trust of investors. And under these circumstances the Ministry's criticism of auctions that established the basis for a part of the electricity price for 2008 sounds strange especially as a state-owned company also took part in the auction. (authors)

  16. Greenhouse effect, sea level rise, and coastal drainage systems

    Energy Technology Data Exchange (ETDEWEB)

    Titus, J G; Kuo, C Y; Gibbs, M J; LaRoche, T B; Webb, M K; Waddell, J O

    1987-01-01

    Increasing concentrations of carbon dioxide and other gases are expected to warm the earth several degrees in the next century, which would raise sea level a few feet and alter precipitation patterns. Both of these changes would have major impacts on the operation of coastal drainage systems. However, because sea level rise and climate change resulting from the greenhouse effect are still uncertain, most planners and engineers are ignoring the potential implications. Case studies of the potential impact on watersheds in Charleston, South Carolina, and Fort Walton Beach, Florida, suggest that the cost of designing a new system to accommodate a rise in sea level will sometimes be small compared with the retrofit cost that may ultimately be necessary if new systems are not designed for a rise. Rather than ignore the greenhouse effect until its consequences are firmly established, engineers and planners should evaluate whether it would be worthwhile to insure that new systems are not vulnerable to the risks of climate change and sea level rise.

  17. Cost and prices of electricity. Fossil fuels, nuclear power and renewable energy sources in comparison; Kosten und Preise fuer Strom. Fossile, Atomstrom und Erneuerbare Energien im Vergleich

    Energy Technology Data Exchange (ETDEWEB)

    Muehlenhoff, Joerg

    2011-09-15

    Consumers of electricity pay for production, transport and distribution as well as for taxes and dues. Electricity rates depend on various influencing factors, e.g. different fuel and capital cost of the power plants and the ratio of supply and demand in the electricity stock markets. End user electricity rats also include taxes and dues as well as the cost of power transmission. The publication presents background information on the formation of electricity rates in Germany. In a second step, the different cost factors of fossil fuels, nuclear power and renewable energy sources are compared. In particular, the external cost is gone into which often tends to be neglected in the electricity markets.

  18. Advanced Launch System (ALS): Electrical actuation and power systems improve operability and cost picture

    Science.gov (United States)

    Sundberg, Gale R.

    1990-01-01

    To obtain the Advanced Launch System (ALS) primary goals of reduced costs and improved operability, there must be significant reductions in the launch operations and servicing requirements relative to current vehicle designs and practices. One of the primary methods for achieving these goals is by using vehicle electrical power system and controls for all actuation and avionics requirements. A brief status review of the ALS and its associated Advanced Development Program is presented to demonstrate maturation of those technologies that will help meet the overall operability and cost goals. The electric power and actuation systems are highlighted as a specific technology ready not only to meet the stringent ALS goals (cryogenic field valves and thrust vector controls with peak power demands to 75 hp), but also those of other launch vehicles, military and civilian aircraft, lunar/Martian vehicles, and a multitude of commercial applications.

  19. Decomposing climate-induced temperature and water effects on the expansion and operation of the US electricity system

    Science.gov (United States)

    Sun, Y.; Eurek, K.; Macknick, J.; Steinberg, D. C.; Averyt, K.; Badger, A.; Livneh, B.

    2017-12-01

    Climate change has the potential to affect the supply and demands of the U.S. power sector. Rising air temperatures can affect the seasonal and total demand for electricity, alter the thermal efficiency of power plants, and lower the maximum capacity of electric transmission lines. Changes in hydrology can affect seasonal and total availability of water used for power plant operations. Prior studies have examined some climate impacts on the electricity sector, but there has been no systematic study quantifying and comparing the importance of these climate-induced effects in isolation and in combination. Here, we perform a systematic assessment using the Regional Energy Deployment System (ReEDS) electricity sector model in combination with downscaled climate results from four models in the CMIP5 archive that provide contrasting temperature and precipitation trends for key regions in the U.S. The ReEDS model captures dynamic climate and hydrological resource data .when choosing the cost optimal mix of generation resources necessary to balance supply and demand for electricity. We examine how different climate-induced changes in air temperature and water availability, considered in isolation and in combination, may affect energy and economic outcomes at a regional and national level from the present through 2050. Results indicate that temperature-induced impacts on electricity consumption show consistent trends nationwide across all climate scenarios. Hydrological impacts and variability differ by model and tend to have a minor effect on national electricity trends, but can be important determinants regionally. Taken together, this suggests that isolated climate change impacts on the electricity system depend on the geographic scale of interest - the effect of rising temperatures on demand, which is qualitatively robust to the choice of climate model, largely determines impacts on generation, capacity and cost at the national level, whereas other impact pathways may

  20. Electricity and heat supply of a settlement at different standards of energy efficiency; Strom- und Waermeversorgung einer Siedlung bei unterschiedlichen Energieeffizienz-Standards

    Energy Technology Data Exchange (ETDEWEB)

    Schuberth, Jens; Tschetschorke, Katja

    2013-07-15

    The underlying study analyses the ecologic impact and the economic efficiency of several conventional and innovative heat supply systems to provide a quarter heat for space and water heating and electricity for residential and commercial application and for street lighting. Retrofits of buildings change the ratio of demands for electricity and heat. The demand for heat decreases more than the demand for electricity, and the share of distribution losses in heat grids rises. The question is if it is still economically efficient to build or extend local and long-distance district heating networks. Demands for final and primary energy, greenhouse gas emissions and costs (for operation, energy consumption and investments) of the different systems are compared and rated both in charts and tables. A sensitivity analysis includes increasing energy purchasing costs and assesses the possible economic efficiency of the supply systems in future. Another sensitivity analysis estimates how the climate impact of the supply systems for heat and electricity changes if electricity generation becomes less harmful for climate. Additionally, costs for environmental damage - so-called external costs - are internalised in the analysis of economic efficiency. In an overall rating ecologic and economically efficient systems are recommended.

  1. TQC works in newly-built nuclear power plant and main electric power system plannings

    International Nuclear Information System (INIS)

    Akiyama, Yoshihisa; Kawakatsu, Tadashi; Hashimoto, Yasuo

    1985-01-01

    In the Kansai Electric Power Co., Inc., TQC has been introduced to solve such major problems in nuclear power generation as the securing of nuclear power reliability, the suppression of rises in the costs, the reduction in long periods of power failure and the promotion in siting of nuclear power plants. It is thus employed as a means of the ''creation of a slim and tough business constitution''. The state of activities in Kansai Electric are described in quality assurance of a newly-built nuclear power plant and in raising the reliability of the main electric power system to distribute the generated nuclear power and further the future prospects are explained. (Mori, K.)

  2. Cost-Effectiveness Comparison of Coupler Designs of Wireless Power Transfer for Electric Vehicle Dynamic Charging

    Directory of Open Access Journals (Sweden)

    Weitong Chen

    2016-11-01

    Full Text Available This paper presents a cost-effectiveness comparison of coupler designs for wireless power transfer (WPT, meant for electric vehicle (EV dynamic charging. The design comparison of three common types of couplers is first based on the raw material cost, output power, transfer efficiency, tolerance of horizontal offset, and flux density. Then, the optimal cost-effectiveness combination is selected for EV dynamic charging. The corresponding performances of the proposed charging system are compared and analyzed by both simulation and experimentation. The results verify the validity of the proposed dynamic charging system for EVs.

  3. Electricity from bagasse in Zimbabwe

    International Nuclear Information System (INIS)

    Mbohwa, C.; Fukuda, S.

    2003-01-01

    Zimbabwe has suffered electrical power shortages resulting in electrical energy imports rising to between 40% and 50% of total energy needs. Electricity generation capacity has stagnated at around 2000 Megawatts (MW e ) since 1985, when two thermal units totaling 440 MW e were completed at Hwange. The effective capacity is 1.75 GW e . The current plan is to increase capacity by installing 600 MW e at Hwange at a cost of at least US $ 600 million. Raising this level of capital is difficult hence over the last 15 years there has been a failure to increase capacity. This article is based on a study of bagasse cogeneration in Zimbabwe and Mauritius conducted over a two-year period. It discusses technology improvements that can be made in the sugar sector to improve process and energy efficiency for the purposes of becoming an independent power producer that supplies power to the grid continuously throughout the year. Power plant investment in the sugar industry offers a bridging and realizable alternative for electricity generation in Zimbabwe. Investment in a 35 MW e bagasse (moisturized fiber left when sugar has been extracted from sugarcane) system would require a capital of about US$ 35 million using modern technology based on experiences in Mauritius and Reunion. A technical and economic evaluation and analysis reveals that bagasse power development is technically and economically feasible if electricity is priced at the long-term marginal cost. At current import prices, financial assistance from the global environment facility and/or the clean development mechanism of the Kyoto protocol would be necessary. The solving of the current political and economic problems in the country would pave the way for attracting a technical partner and development, of bagasse power using domestic and international financing

  4. Impact analysis of coal-electricity pricing linkage scheme in China based on stochastic frontier cost function

    International Nuclear Information System (INIS)

    Li, Hong-Zhou; Tian, Xian-Liang; Zou, Tao

    2015-01-01

    Highlights: • This study evaluates the coal-electricity pricing linkage policy in China. • Six stochastic frontier cost models are used to estimate efficiency measures. • The coal-electricity pricing linkage scheme is a double-edged sword. • We suggest the threshold value of 5% or group specific. - Abstract: This study evaluates the feasibility and fairness of 2012 amendment to coal-electricity pricing linkage policy in China. Our empirical design is based on several stochastic frontier cost functions and the results show that the amended pricing linkage scheme is a double-edged sword as follows. On the one hand, it provides incentives for less-efficient (with efficiency less than 90%) power plants to increase their efficiency. One the other hand, it imposes a penalty to highly-efficient power plants (with efficiency more than 90%). And even worse, the higher the efficiency is, the bigger the penalty will be. To make the current coal-electricity pricing linkage scheme more feasible, we suggest the threshold value of 5 instead of 10%, and a group specific threshold value instead of the current one-size-for-all practice

  5. Use of low-cost aluminum in electric energy production

    Science.gov (United States)

    Zhuk, Andrey Z.; Sheindlin, Alexander E.; Kleymenov, Boris V.; Shkolnikov, Eugene I.; Lopatin, Marat Yu.

    Suppression of the parasitic corrosion while maintaining the electrochemical activity of the anode metal is one of the serious problems that affects the energy efficiency of aluminum-air batteries. The need to use high-purity aluminum or special aluminum-based alloys results in a significant increase in the cost of the anode, and thus an increase in the total cost of energy generated by the aluminum-air battery, which narrows the range of possible applications for this type of power source. This study considers the process of parasitic corrosion as a method for hydrogen production. Hydrogen produced in an aluminum-air battery by this way may be further employed in a hydrogen-air fuel cell (Hy-air FC) or in a heat engine, or it may be burnt to generate heat. Therefore, anode materials may be provided by commercially pure aluminum, commercially produced aluminum alloys, and secondary aluminum. These materials are much cheaper and more readily available than special anode alloys of aluminum and high-purity aluminum. The aim of present study is to obtain experimental data for comparison of energy and cost parameters of some commercially produced aluminum alloys, of high-purity aluminum, and of a special Al-ln anode alloy in the context of using these materials as anodes for an Al-air battery and for combined production of electrical power and hydrogen.

  6. The capital investment and electricity cost of 2 x 600 MW PWR nuclear power plant in China

    International Nuclear Information System (INIS)

    Li Zhihua; Xing Leiming

    1990-01-01

    The capital investment and electricity cost of 2 x 600 MW PWR nuclear power plant in China are studied. If the rate of interest R 1 and of escalation R 2 are 7.2% and 10.0% respectively for RMB and the rate of interest R 1 and of escalation R 2 are 6.5% and 2.0% respectively for MK, the total investment is 9270 M RMB Yuan, the Specific investment is 7320 RMB Yuan/kW, the average selling electricity cost is 0.16 RMB Yuan/(kW·h). If the selling electricity price is 0.24 RMB Yuan/(kW·h), the rate of inner return is 7.7%, the dynamic return period is 13 years, the national income is 15800 M RMB Yuan, the profit of nuclear power plant after taxation is 6800 M RMB Yuan

  7. Evaluation of the electric power production cost growth due to decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Basso, G.

    1982-01-01

    The increase of production cost for electric power generated by nuclear plants, due to their decommissioning and the end of operating life, is analysed in respect to (a) waiting time from indefinite shut-down date to the start of dismantlement, (b) financing method, (c) interest and inflation rates. The analysis shows that the additional cost is always small for those solutions which have higher probability to be adopted

  8. Estimation of the cost savings from participation of electric vehicles in Vehicle to Grid (V2G) schemes

    OpenAIRE

    Kiaee, Mahdi; Cruden, Andrew; Sharkh, S.M.

    2015-01-01

    The storage capacity of the batteries in an electric vehicle (EV) could be utilised to store electrical energy and give it back to the grid when needed by participating in vehicle to grid (V2G) schemes. This participation could be a source of revenue for vehicle owners thus reducing the total charging cost of their EVs. A V2G simulator has been developed using MATLAB to find out the potential cost saving from participation of EVs in V2G schemes. A standard IEEE30 network has been modelled in ...

  9. Efficiency in the United States electric industry: Transaction costs, deregulation, and governance structures

    Science.gov (United States)

    Peterson, Carl

    Transaction costs economics (TCE) posits that firms have an incentive to bypass the market mechanisms in situations where the cost of using the market is prohibitive. Vertical integration, among other governance mechanisms, can be used to minimize the transactions costs associated with the market mechanism. The study analyses different governance mechanisms, which range from complete vertical integration to the use of market mechanisms, for firms in the US electric sector. This sector has undergone tremendous change in the past decade including the introduction of retail competition in some jurisdictions. As a result of the push toward deregulation of the industry, vertically integration, while still significant in the sector, has steadily been replaced by alternative governance structures. Using a sample of 136 investor-owned electric utilities that reported data the US Federal Energy Regulatory Commission between 1996 and 2002, this study estimates firm level efficiency using Data Envelopment Analysis (DEA) and relates these estimates to governance structure and public policies. The analysis finds that vertical integration is positively related to firm efficiency, although in a non-linear fashion suggesting that hybrid governance structures tend to be associated with lower efficiency scores. In addition, while some evidence is found for negative short-term effects on firm efficiency from the choice to deregulate, this result is sensitive to DEA model choice. Further, competition in retail markets is found to be positively related to firm level efficiency, but the retreat from deregulation, which occurred after 2000, is negatively associated with firm-level efficiency. These results are important in the ongoing academic and public policy debates concerning deregulation of the electric section and indicate that vertical economies remain in the industry, but that competition has provided incentives for improving firm level efficiency.

  10. Impact of carbon cost on wholesale electricity price: A note on price pass-through issues

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Wook [Korea Southern Power Co., 167, Samsung-dong, Gangnam-gu, Seoul 135-791 (Korea); Chattopadhyay, Deb [Saha International, Level 26, 385 Bourke Street, Melbourne, VIC 3000 (Australia); Park, Jong-bae [Electrical Engineering Department, Konkuk University, 1 Hwayang-dong, Kwanggin-gu, Seoul 143-701 (Korea)

    2010-08-15

    Carbon costs - either in the form of a carbon tax or through permit prices in an emissions trading scheme - would ultimately be reflected in higher electricity prices. Carbon cost ''pass-through'' is critical to the survival of existing coal generation assets and has been discussed widely as a measure of business impact in the electricity industry. This paper sets out in a structured way the factors that determine price pass-through and why this may differ greatly across different systems. Although the basic concept of price pass-through is simple, a clear understanding of the underlying factors is critical to developing insights on how carbon cost would impact on existing coal generation businesses. It is shown that pass-through can vary drastically if the underlying dispatch potential of generators varies significantly across alternative emissions reduction scenarios. It can also vary depending on the availability of competing cleaner forms of generation. Pass-through as a measure of business performance is, therefore, hard to generalize across different circumstances and should be interpreted carefully. (author)

  11. Renewable electricity as a differentiated good? The case of the Republic of Korea

    International Nuclear Information System (INIS)

    Kim, Jihyo; Park, Jooyoung; Kim, Jinsoo; Heo, Eunnyeong

    2013-01-01

    This paper examines the willingness for Korean consumers to pay a premium for renewable electricity under a differentiated good framework by applying the contingent valuation method. Korean consumers have been required to pay for their use of renewable electricity as of 2012. First, we find that Korean consumers recognise renewable electricity as a differentiated good from traditional electricity generated from fossil fuels or nuclear energy. The mean willingness to pay to use renewable electricity is USD 1.26 per month. Second, we confirm the existence of perfect substitution relationships among variant renewable technologies, which suggests that Korean consumers do not perceive them as differentiated goods. One reason for this perception is that Korean consumers are more inclined to favour economic feasibility over sustainability or the availability of the resource stock when choosing between renewable technology types. In sum, we can say that Korean consumers recognise renewable electricity as a differentiated good but that they do not differentiate between variant renewable technologies. Thus, the imposition of the cost of renewable electricity on consumers in the form of increased electricity charges would be acceptable to consumers as long as any price rise properly reflects their preferences. - Highlights: ► We examine renewable electricity in Korea using contingent valuation. ► Korean consumers recognise renewable electricity to be a differentiated good. ► They do not perceive types of renewable technologies as differentiated goods. ► A cost-minimising portfolio is assumed to be preferred by Korean consumers

  12. Decreasing Soft Costs for Solar Photovoltaics by Improving the Interconnection Process. A Case Study of Pacific Gas and Electric

    Energy Technology Data Exchange (ETDEWEB)

    Ardani, Kristen [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    As of the end of 2014, Pacific Gas and Electric (PG&E) had connected over 130,000 DG PV systems in its service territory, more than any other utility in the U.S. In this case study, we examine how PG&E achieved a faster, more efficient interconnection approval process despite rising application volumes.

  13. Electricity and fluid fuels from biomass and coal using advanced technologies: a cost comparison for developing country applications

    Energy Technology Data Exchange (ETDEWEB)

    Kartha, S; Larson, E D; Williams, R H [Center for Energy and Environment Studies School of Engineering and Applied Science, Princeton University, Princeton, NJ (United States); Katofsky, R E [Arthur D. Little Co., Cambridge, MA (United States); Chen, J [Thermo Fibertek, Inc., Auburn, MA (United States); Marrison, C I [Oliver, Wyman and Co., New York, NY (United States)

    1995-12-01

    Recent analyses of alternative global energy supply strategies, such as the forthcoming report of the Intergovernmental Panel on Climate Change (IPCC), to be published in 1996, have drawn attention to the possibility that biomass modernized with advanced technologies could play an important role in meeting global energy needs in the next century. This paper discusses two promising classes of advanced technologies that offer the potential for providing modem energy carriers (electricity and fluid fuels) from biomass at competitive costs within one or two decades. These technologies offer significantly more efficient use of land than currently commercial technologies for producing electricity and fluid fuels from biomass, as well as substantially improved energy balances. Electricity is Rely to be the first large market for modernized biomass, but the potential market for fluid fuel production is likely to be much larger. As coal is likely to present a more serious competitive challenge to biomass in the long run, we present an economic comparison with coal-based electricity and fluid fuels. A meaningful economic comparison between coal and biomass is possible because these feedstocks are sufficiently alike in their physical characteristics that similar conversion technologies may well be used for producing electricity and fluid fuels from them. When similar conversion technologies are used for both feedstocks, the relative costs of electricity or fluid fuels will be determined by the distinguishing technical characteristics of the feedstocks (sulphur content, moisture content and reactivity) and by the relative feedstock prices. Electric power generation from biomass and coal are compared here using an advanced integrated gasifier/gas turbine cycle that offers the potential for achieving high efficiency, low unit capital cost and low local pollutant emissions: the steam-injected gas turbine coupled to an air-blown gasifier. For both feedstocks, generation costs are

  14. Electricity and fluid fuels from biomass and coal using advanced technologies: a cost comparison for developing country applications

    International Nuclear Information System (INIS)

    Kartha, S.; Larson, E.D.; Williams, R.H.; Katofsky, R.E.; Chen, J.; Marrison, C.I.

    1995-01-01

    Recent analyses of alternative global energy supply strategies, such as the forthcoming report of the Intergovernmental Panel on Climate Change (IPCC), to be published in 1996, have drawn attention to the possibility that biomass modernized with advanced technologies could play an important role in meeting global energy needs in the next century. This paper discusses two promising classes of advanced technologies that offer the potential for providing modem energy carriers (electricity and fluid fuels) from biomass at competitive costs within one or two decades. These technologies offer significantly more efficient use of land than currently commercial technologies for producing electricity and fluid fuels from biomass, as well as substantially improved energy balances. Electricity is Rely to be the first large market for modernized biomass, but the potential market for fluid fuel production is likely to be much larger. As coal is likely to present a more serious competitive challenge to biomass in the long run, we present an economic comparison with coal-based electricity and fluid fuels. A meaningful economic comparison between coal and biomass is possible because these feedstocks are sufficiently alike in their physical characteristics that similar conversion technologies may well be used for producing electricity and fluid fuels from them. When similar conversion technologies are used for both feedstocks, the relative costs of electricity or fluid fuels will be determined by the distinguishing technical characteristics of the feedstocks (sulphur content, moisture content and reactivity) and by the relative feedstock prices. Electric power generation from biomass and coal are compared here using an advanced integrated gasifier/gas turbine cycle that offers the potential for achieving high efficiency, low unit capital cost and low local pollutant emissions: the steam-injected gas turbine coupled to an air-blown gasifier. For both feedstocks, generation costs are

  15. Total cost of ownership of electric vehicles compared to conventional vehicles: A probabilistic analysis and projection across market segments

    International Nuclear Information System (INIS)

    Wu, Geng; Inderbitzin, Alessandro; Bening, Catharina

    2015-01-01

    While electric vehicles (EV) can perform better than conventional vehicles from an environmental standpoint, consumers perceive them to be more expensive due to their higher capital cost. Recent studies calculated the total cost of ownership (TCO) to evaluate the complete cost for the consumer, focusing on individual vehicle classes, powertrain technologies, or use cases. To provide a comprehensive overview, we built a probabilistic simulation model broad enough to capture most of a national market. Our findings indicate that the comparative cost efficiency of EV increases with the consumer's driving distance and is higher for small than for large vehicles. However, our sensitivity analysis shows that the exact TCO is subject to the development of vehicle and operating costs and thus uncertain. Although the TCO of electric vehicles may become close to or even lower than that of conventional vehicles by 2025, our findings add evidence to past studies showing that the TCO does not reflect how consumers make their purchase decision today. Based on these findings, we discuss policy measures that educate consumers about the TCO of different vehicle types based on their individual preferences. In addition, measures improving the charging infrastructure and further decreasing battery cost are discussed. - Highlights: • Calculates the total cost of ownership across competing vehicle technologies. • Uses Monte Carlo simulation to analyse distributions and probabilities of outcomes. • Contains a comprehensive assessment across the main vehicle classes and use cases. • Indicates that cost efficiency of technology depends on vehicle class and use case. • Derives specific policy measures to facilitate electric vehicle diffusion

  16. Impact and Cost Evaluation of Electric Vehicle Integration on Medium Voltage Distribution Networks

    DEFF Research Database (Denmark)

    Wu, Qiuwei; Cheng, Lin; Pineau, Ulysse

    2013-01-01

    This paper presents the analysis of the impact of electric vehicle (EV) integration on medium voltage (MV) distribution networks and the cost evaluation of replacing the overloaded grid components. A number of EV charging scenarios have been studied. A 10 kV grid from the Bornholm Island...... in the city area has been used to carry out case studies. The case study results show that the secondary transformers are the bottleneck of the MV distribution networks and the increase of EV penetration leads to the overloading of secondary transformers. The cost of the transformer replacement has been...

  17. Calculation of investment cost and electricity tariff on first building of Nuclear power plant in Indonesia

    International Nuclear Information System (INIS)

    Mochamad Nasrullah; Sudi Arianto

    2005-01-01

    Nuclear power plant as one alternative power plant for Indonesia is expected to attract interest of investors to invest in electricity sector. Calculation of investment cost and electricity tariff is a nearly necessary Information needed by investors. Spread sheet calculations on construction cost including Interest During Construction and escalation as well as financial viability are implemented. Result of the study show that overnight cost before escalation is US $ 2.682.865.200,- and after IDC and escalation it becomes US $ 3.795.712.088 or 1.807,5 US$/k We. Levelized Tariff is at around 4,57 cents/kWh. Levelized Tariff is 3,5 cents/kWh not feasible to the project of because all financial parameter show negative value. The project is financially feasible if calculated levelized tariff within arrange of 4,0 cents/kWh-5,5 cents/kWh. The most profitable tariff for investor is within arrange of 4,87 cents/kWh - 5,11 cents/kWh. (author)

  18. Professor Jeffery on the real cost of nuclear electricity in the UK: a note; and reply

    International Nuclear Information System (INIS)

    McGuire, A.; Barclay, R.S.; Jeffery, J.W.

    1982-01-01

    Two letters published in reply to an earlier article on the real cost of nuclear electricity in the U.K. criticize the use of the Retail Price Index as a price deflator and the attempts to convert capital charges from historical to a current cost basis. Corrections are made to the corresponding results. The author of the original article replies. (U.K.)

  19. Superconducting magnetic energy storage for electric utility load leveling: A study of cost vs. stored energy

    International Nuclear Information System (INIS)

    Luongo, C.A.; Loyd, R.J.

    1987-01-01

    Superconducting Magnetic Energy Storage (SMES) is a promising technology for electric utility load leveling. This paper presents the results of a study to establish the capital cost of SMES as a function of stored energy. Energy-related coil cost and total installed plant cost are given for construction in nominal soil and in competent rock. Economic comparisons are made between SMES and other storage technologies and peaking gas turbines. SMES is projected to be competitive at stored energies as low as 1000 MWh

  20. Optimized electricity expansions with external costs internalized and risk of severe accidents as a new criterion in the decision analysis

    Energy Technology Data Exchange (ETDEWEB)

    Martin del Campo M, C.; Estrada S, G. J., E-mail: cmcm@fi-b.unam.mx [UNAM, Facultad de Ingenieria, Departamento de Sistemas Energeticos, Paseo Cuauhnahuac 8532, 62550 Jiutepec, Morelos (Mexico)

    2011-11-15

    The external cost of severe accidents was incorporated as a new element for the assessment of energy technologies in the expansion plans of the Mexican electric generating system. Optimizations of the electric expansions were made by internalizing the external cost into the objective function of the WASP-IV model as a variable cost, and these expansions were compared with the expansion plans that did not internalize them. Average external costs reported by the Extern E Project were used for each type of technology and were added to the variable component of operation and maintenance cost in the study cases in which the externalises were internalized. Special attention was paid to study the convenience of including nuclear energy in the generating mix. The comparative assessment of six expansion plans was made by means of the Position Vector of Minimum Regret Analysis (PVMRA) decision analysis tool. The expansion plans were ranked according to seven decision criteria which consider internal costs, economical impact associated with incremental fuel prices, diversity, external costs, foreign capital fraction, carbon-free fraction, and external costs of severe accidents. A set of data for the calculation of the last criterion was obtained from a Report of the European Commission. We found that with the external costs included in the optimization process of WASP-IV, better electric expansion plans, with lower total (internal + external) generating costs, were found. On the other hand, the plans which included the participation of nuclear power plants were in general relatively more attractive than the plans that did not. (Author)

  1. Costing and pricing electric power reserve services. Final report

    International Nuclear Information System (INIS)

    Kirsch, L.D.; Rajaraman, R.; Clark, C.

    1997-12-01

    In the competitive electric power markets of the imminent future, reserves will be the second largest generation service in terms of their revenues and profits. Because reserves will be more widely traded than at present, they will be provided by the cheapest available sources regardless of the ownership of those sources. Price will determine the willingness of generators and consumers to provide reserve services; and it may also determine the willingness of reserve users to purchase reserve services. This report presents a methodology by which generation firms and merchant firms can profitably cost and price the reserve services that they offer. The methodology is generally applicable to a wide range of market structures that such firms might face

  2. Electric Car Users’ Time of Charging Problem under Peak Load Pricing When Delay in Charging Time Involves Uncertain Cost

    DEFF Research Database (Denmark)

    Fetene, Gebeyehu Manie

    The problem of peak load arises when demand fluctuates over time while the pro- duction technology is not flexible (or making it flexible is economically inefficient) and/or when a product is non-storable (or storage cost is huge). Peak load is a com- mon problem in consumption of public utilities......, on the one hand, observed cost saving benefit of postponing the time of charging to off-peak lower fee of charging and, on the other hand, the cost of delay in departure time for planned trips and uncertain cost of late charging associated with likelihood occur- rence of unanticipated trip before the car...... of electricity. The electric vehicle (EV) users choice of time of charging problem under PLP is different from that of general households using energy for house appliances since there is uncertain cost to the former as- sociated with likelihood occurrence of unanticipated trips such as visiting hospital...

  3. Electricity pricing

    International Nuclear Information System (INIS)

    Wijayatunga, P.D.C.

    1994-01-01

    Electricity pricing in most countries, especially in the developing world, has been determined by traditional accounting criteria where it raises revenue requirements to cover the operating costs and a return on past and future capital investments in possible power systems. The use of economic principles to improve the total economic efficiency in the electricity industry is discussed. Basic marginal cost theory, long run marginal costing (LRMC) cost categories and rating periods, marginal capacity costs, marginal energy costs, consumer costs, short run marginal costing (SRMC), marginal cost of fuel, marginal cost of network losses, market clearing price, value of unserved energy and network quality of supply cost are discussed

  4. The future cost of cancer in South Africa: An interdisciplinary cost management strategy.

    Science.gov (United States)

    Sartorius, K; Sartorius, B; Govender, P S; Sharma, V; Sherriff, A

    2016-09-06

    The exponential rise in cancer costs in South Africa (SA) was illustrated in a recent Sunday Times article entitled 'The cost of cancer can be a debt sentence'. Our Minister of Health talks of a 'war' against the high costs of cancer drugs, and epidemiologists project a sharply rising incidence. Eminent international medical journals, such as The Lancet, underline the fact that cancer cost is a growing international problem that confronts even the richest countries. If richer countries in the world are battling to cover the costs of cancer, what is the prognosis for SA?

  5. Liberalised electricity markets, new bioenergy technologies, and GHG emission reductions: interactions and CO2 mitigation costs

    International Nuclear Information System (INIS)

    Gustavsson, L.; Madlener, R.

    1999-01-01

    We contrast recent developments in power and heat production with bioenergy, and natural-gas-fired condensing plants with and without decarbonisation, in the light of electricity market liberalisation. Our main focus is on CO 2 mitigation costs and carbon tax sensitivity of production costs. We find that CO 2 mitigation costs are lower for biomass systems using IGCC technology than for natural gas system using decarbonisation. However, based on current fuel prices natural-gas fired co-generation plants have the lowest production costs. Hence energy policy measures will be needed to promote biomass technologies and decarbonisation options on a liberalised market. (author)

  6. Estimating the cost of improving quality in electricity distribution: A parametric distance function approach

    International Nuclear Information System (INIS)

    Coelli, Tim J.; Gautier, Axel; Perelman, Sergio; Saplacan-Pop, Roxana

    2013-01-01

    The quality of electricity distribution is being more and more scrutinized by regulatory authorities, with explicit reward and penalty schemes based on quality targets having been introduced in many countries. It is then of prime importance to know the cost of improving the quality for a distribution system operator. In this paper, we focus on one dimension of quality, the continuity of supply, and we estimated the cost of preventing power outages. For that, we make use of the parametric distance function approach, assuming that outages enter in the firm production set as an input, an imperfect substitute for maintenance activities and capital investment. This allows us to identify the sources of technical inefficiency and the underlying trade-off faced by operators between quality and other inputs and costs. For this purpose, we use panel data on 92 electricity distribution units operated by ERDF (Electricité de France - Réseau Distribution) in the 2003–2005 financial years. Assuming a multi-output multi-input translog technology, we estimate that the cost of preventing one interruption is equal to 10.7€ for an average DSO. Furthermore, as one would expect, marginal quality improvements tend to be more expensive as quality itself improves. - Highlights: ► We estimate the implicit cost of outages for the main distribution company in France. ► For this purpose, we make use of a parametric distance function approach. ► Marginal quality improvements tend to be more expensive as quality itself improves. ► The cost of preventing one interruption varies from 1.8 € to 69.2 € (2005 prices). ► We estimate that, in average, it lays 33% above the regulated price of quality.

  7. Cost-efficient demand-pull policies for multi-purpose technologies – The case of stationary electricity storage

    International Nuclear Information System (INIS)

    Battke, Benedikt; Schmidt, Tobias S.

    2015-01-01

    Highlights: • A definition of multi-purpose technologies (MPTs) is proposed. • Opportunities for a cost-efficient demand-pull policy strategy for MPTs are derived. • The multi-purpose character of stationary electricity storage (SES) is shown. • An exemplary profitability assessment of one SES technology supports the argument. - Abstract: Stationary electricity storage technologies (SES) allow to increase the shares of intermittent renewable energy technologies in electricity networks. As SES currently exhibit high costs, policy makers have started introducing demand-pull policies in order to foster their diffusion and drive these technologies further down the learning curve. However, as observed in the case of renewable energy technologies, demand-pull policies for technologies can come at high costs in cases where the profitability gap that needs to be covered by the policy support is large. Yet, SES can create value in multiple distinct applications in the power system – making it a “multi-purpose technology”. We argue that policy makers can make use of the multi-purpose character of SES to limit costs of demand-pull policies. We propose a policy strategy which grants support based on the profitability gap in the different applications, thereby moving down the learning curve efficiently. To support our argumentation, we firstly conduct a comprehensive literature review of SES applications exemplifying the multi-purpose character of these technologies. Second, we assess the profitability of one SES technology (vanadium redox flow battery) in five SES applications, highlighting a strong variation of the profitability gap across these applications

  8. Prices on electricity and transmission of electricity

    International Nuclear Information System (INIS)

    2003-01-01

    This publication contains data on prices of electric energy and transmission of electricity valid from 1 January 2003. The purpose is to illustrate the price changes on the electricity market in terms of prices for different customer categories. All companies holding network concessions for areas and all companies trading in electricity are included in this report, which is produced on an annual basis.The prices for transmission services 1 January 2003 were on the whole unchanged compared to the preceding year. For households the mean annual cost was SEK 882 for flats, SEK 4 335 for one- or two-family houses with electric heating and SEK 1 925 for those without electric heating. Electricity prices rose considerably on 1 January 2003 compared to the year before. The mean price per kWh for households with standard agreements was SEK 0.519 for deliveries to flats, SEK 0.447 for one- or two-family houses with electric heating and SEK 0.471 without electric heating. As a result, the mean annual cost increased by SEK 326 for flats, SEK 3 012 for one- or two-family houses with electric heating, and by SEK 774 for those houses without electric heating. The high costs of electricity may be explained in part by the development on the Nordic Power Exchange (Nord Pool), where the spot price increased by about 290 per cent during 2002 (1 USD is about 8 SEK)

  9. Latest results of the international discussion on the social costs of energy - how does wind compare today?

    International Nuclear Information System (INIS)

    Hohmeyer, O.H.

    1990-01-01

    A first analysis of the social costs of competing technologies for electric power generation published in 1988 has induced a rather controversial scientific discussion about the magnitude of and the possible ways to incorporate cost elements not included in energy prices into decisions on energy systems. Different research projects following up a number of controversial or unanswered questions in the field of social costs have been started in the Federal Republic of Germany (FRG), in Europe and overseas. A first ''counter-study'' has been published in the FRG in 1989. The paper summarizes the latest results of international scientific discussion and research and sketches possible future trends in this field and the practical and political implementation of its results. A first estimate of the consideration of global warming effects due to conventional electricity generation is included in addition to recalculated results on topics addressed by the author in 1988. It concludes that the figures calculated in 1988 have been underestimating the magnitude of the costs not included in the energy prices and that new calculations including further results on CO 2 lead to significantly higher figures. The difference of the costs not included in the price of conventional electricity and wind energy rises from 8.4 to 14 Pf/kWh on average with an estimated range of 4.7 to 25.4 Pf/kWh (1 DM = 100 pf = 0.5 ECU). Considering the full costs of electricity generation it can be concluded that wind energy is one of the most economical ways to produce electricity today. Political considerations on how to take social costs of electricity generation into account have reached some definite conclusions in some states of the USA. The paper gives a short sketch of these activities. (Author)

  10. Technological features of installation of transformable low-rise buildings from sandwich panels

    Directory of Open Access Journals (Sweden)

    Pleshivtsev Aleksandr Aleksandrovich

    2018-04-01

    Full Text Available Subject of research: organizational and technological solutions are considered in the construction of transformable low-rise residential buildings using sandwich panels. Aims: rational choice of organizational and technological solutions for the rhythmic construction of the underground and above-ground part of the transformable low-rise buildings in order to reduce labor costs and construction time. Materials and methods: methods of computer modeling of the technological processes are used to determine the duration of the construction of the low-rise buildings. Results: rational methods for erecting a complex of transformable low-rise buildings are defined, parameters of technological processes are established, an analysis of technological operations is provided for the construction of transformable low-rise residential buildings using sandwich panels. Conclusions: now organizational and technological solutions for the construction of transformable low-rise residential buildings with the use of sandwich panels reduce labour costs, increase the construction pace and as well as the using of improved technological processes in the construction of such buildings leads to a reduction in construction time.

  11. Electrical Market Management Considering Power System Constraints in Smart Distribution Grids

    Directory of Open Access Journals (Sweden)

    Poria Hasanpor Divshali

    2016-05-01

    Full Text Available Rising demand, climate change, growing fuel costs, outdated power system infrastructures, and new power generation technologies have made renewable distribution generators very attractive in recent years. Because of the increasing penetration level of renewable energy sources in addition to the growth of new electrical demand sectors, such as electrical vehicles, the power system may face serious problems and challenges in the near future. A revolutionary new power grid system, called smart grid, has been developed as a solution to these problems. The smart grid, equipped with modern communication and computation infrastructures, can coordinate different parts of the power system to enhance energy efficiency, reliability, and quality, while decreasing the energy cost. Since conventional distribution networks lack smart infrastructures, much research has been recently done in the distribution part of the smart grid, called smart distribution grid (SDG. This paper surveys contemporary literature in SDG from the perspective of the electricity market in addition to power system considerations. For this purpose, this paper reviews current demand side management methods, supply side management methods, and electrical vehicle charging and discharging techniques in SDG and also discusses their drawbacks. We also present future research directions to tackle new and existing challenges in the SDG.

  12. Challenges to China's transition to a low carbon electricity system

    Energy Technology Data Exchange (ETDEWEB)

    Kahrl, Fredrich, E-mail: fkahrl@berkeley.edu [Energy and Resources Group, University of California, Berkeley, 310 Barrows Hall, Berkeley, CA 94720 (United States); Williams, Jim [Energy and Environmental Economics, Inc., 101 Montgomery Street, 16th Floor, San Francisco, CA 94104 (United States); Monterey Institute of International Studies, 460 Pierce Street, Monterey, CA 93940 (United States); Ding Jianhua [Energy and Environmental Economics, Inc., 101 Montgomery Street, 16th Floor, San Francisco, CA 94104 (United States); Hu Junfeng [School of Economics and Business Administration, North China Electric Power University, Beijing 102206 (China)

    2011-07-15

    We examine the challenges to China's transition to a low carbon electricity system, in which renewable energy would play a significant role. China's electricity system currently lacks the flexibility in planning, operations, and pricing to respond to conflicting pressures from demand growth, rising costs, and environmental mandates in a way that simultaneously maintains reliability, decarbonizes the system, and keeps prices within acceptable bounds. Greater flexibility crucially requires the ability to more systematically and transparently manage and allocate costs. This will require re-orientating sector institutions still rooted in central planning, and strengthening independent regulation. Some of the necessary changes require fundamental political and legal reforms beyond the scope of energy policy. However, the system's flexibility can still be increased through the development of traditional planning and regulatory tools and approaches, such as an avoided cost basis for energy efficiency investments, more integrated planning to improve the coordination of generation, transmission, and demand-side investments, and a transparent ratemaking process. The judicious application of OECD electricity sector experience and skills can support these developments. - Research Highlights: > China's electricity system currently lacks the flexibility to integrate renewables and reduce CO{sub 2} emissions on a large scale at an acceptable cost and level of reliability. > The challenges to increased flexibility are more institutional than technological. > Chinese government agencies need new approaches to basic power system planning and ratemaking. > OECD countries can help address these challenges through the transfer of 'soft' technologies.

  13. Peak shifting and cross-class subsidization: The impacts of solar PV on changes in electricity costs

    International Nuclear Information System (INIS)

    Johnson, Erik; Beppler, Ross; Blackburn, Chris; Staver, Benjamin; Brown, Marilyn; Matisoff, Daniel

    2017-01-01

    The expansion of distributed solar necessitates additional research into the impacts on both utilities and their customers. In this paper we use New Jersey solar data, PJM market data, and demand profiles from a PJM utility to investigate rate and bill impacts of large-scale solar penetration. In addition to the subsidization of solar adopters by non-participants, we highlight the channels through which cross-subsidization of rate classes can arise in practice. The results of our study indicate that the fear of a utility “death spiral” may be exaggerated. Significant solar can be incorporated with only a 2% increase in non-participant bills. At high levels of penetration, distributed solar has the potential to alter the system peak hour which affects the allocation of costs across rate-classes. As the peak hour shifts to the evening when solar production diminishes, residential customers face higher distribution costs. Policy makers and utilities need to be aware of these challenges in designing the next generation of rates that are better aligned with cost causality. - Highlights: • We develop a model of electricity costs with large amounts of solar adoption. • Solar adoption leads to cost redistribution across customer classes. • Costs are redistributed partially because peak utility load shifts later in the day. • Residential distributed solar generation affects electricity bills the most. • We confirm the subsidy of participants by non-participants in net metering programs.

  14. Rising costs call for new European refining strategies

    International Nuclear Information System (INIS)

    Sweeney, B.N.C.

    1993-01-01

    The outlook for the global refining industry is for increased spending and reduced margins, largely because of efforts to improve the environment. A look at these trends through the end of the decade is thus in order. Three major industry thrusts are proposed to see refiners through this uncertain period. Three main thrusts are necessary: fixed costs must be reduced by re-engineering business processes and reexamining noncore business units against total and marginal costs. In this respect the best refiners are well ahead of the good ones. New cooperative ways of meeting regulations must be sought, to avoid wasteful over capacity. Joint ventures and alliances with competitors will be needed. The cooperative principle upstream must be extended and new strategies must be sought to meet product demand changes and reduce feedstock costs. The picture that is presented is tough, largely because of the wish to improve the environment. The question that must be continually reviewed is ''Have governments got the right balance in these regulations between the environment and the downstream industry?''

  15. Projections of cost and on-site manual-labor requirements for constructing electric-generating plants, 1980-1990

    International Nuclear Information System (INIS)

    1982-02-01

    This report represents part of a continuing effort by the Federal Government to forecast the capital and labor required for constructing electric generating capacity additions necessary to accommodate projected economic and population growth in the US and its regions. Information is included on anticipated additions to electric generating capacity, labor requirements for these additions, capital cost requirements, and forecasting models. Coal-fired, nuclear, hydro, and pumped storage power plants are considered in these forecasts

  16. A Cost-effective and Emission-aware Power Management System for Ships with Integrated Full Electric Propulsion

    DEFF Research Database (Denmark)

    Kanellos, Fotis D.; Anvari-Moghaddam, Amjad; Guerrero, Josep M.

    2017-01-01

    The extensive exploitation of electric power in ships enables the development of more efficient and environmentally friendlier ships, as it allows for a more flexible ship power system operation and configuration. In this paper, an optimal power management method for ship electric power systems....... The proposed fuzzy-based particle swarm optimization (FPSO) algorithm aims at minimizing the operation cost, limiting the greenhouse gas (GHG) emissions and satisfying the technical and operational constraints of the ship....

  17. Modelling the transition from cost-based to bid-based pricing in a deregulated electricity-market

    International Nuclear Information System (INIS)

    Druce, Donald J.

    2007-01-01

    Alberta is a province in western Canada with a deregulated electricity-market. Market clearing prices for most hours reflect the cost of either coal-fired or gas-fired thermal generation. Whenever there is a chronic shortage of generation or even a temporary one due to an outage, prices can be bid much higher than fuel costs would suggest. The province of British Columbia borders Alberta to the west and its electric utility, BC Hydro, has a history of trade with the utilities in Alberta. BC Hydro has predominantly hydroelectric resources and large storage reservoirs. Prior to Alberta's deregulation in 1996, BC Hydro was able to enter into mutually beneficial load-factoring contracts with the Alberta utilities. Now, as long as the transmission is available, BC Hydro can buy low priced off-peak coal-fired energy and sell into the high priced periods without having to share the benefits. BC Hydro uses a combination of econometric and Monte Carlo modelling to simulate hourly price-duration curves for Alberta that capture both cost-based and bid-based characteristics. This approach provides a good fit with the stochastic dynamic programming model that BC Hydro has developed for its mid-term hydro scheduling

  18. Electric automation history and state of the art; Historia da automacao eletrica e estado da arte

    Energy Technology Data Exchange (ETDEWEB)

    Mendes, M.F. [Itaipu Binacional, Foz do Iguacu, PR (Brazil). Div. de Engenharia Eletronica e Sistemas de Controle], E-mail: mendes@ieee.org; Jardini, J.A. [Universidade de Sao Paulo (PEA/EP/USP), SP (Brazil). Escola Politecnica. Dept. de Engenharia de Energia e Automacao Eletricas], E-mail: jardini@pea.usp.br

    2009-07-01

    The article summarizes the history of electric systems automation, used in hydroelectric power plants, since the rise to the present day. Technologies are presented employed at various times, developments, the difference and the reasons for evolution. The emphasis is on today's modern systems technology, covering: communication, standardization, hardware, software, architecture, maintenance, operation and challenges. This work pretend to give subsidies for the design and implementation of automation systems electricity using state of the art. The scope are the new plants as well as those being modernized. Knowledge of history is important to investigate, to plan and evaluate the costs and benefits of automation systems for new electric plants and those that are undergoing processes technological upgrading.

  19. Cost of electricity generated and fuel saving of an optimized wind-diesel electricity supply for village in Tangier-area (Morocco)

    International Nuclear Information System (INIS)

    Nfaoui, H.; Buret, J.

    1996-01-01

    In several of the remote areas of Morocco, diesel generators are used to provide electrical power. Such systems are often characterized by poor efficiency and high maintenance costs. The integration of wind turbine with a diesel/battery hybrid system is becoming cost-effective in wind locations. In previous works (Nfaoul et al, 1990, 1994a, 1994b), the wind characteristics in Tangier-area were studied on the basis of 12 years (1978-1989) of hourly average wind speed data. A wind/diesel energy system with battery storage has been modelled using the Tangiers wind regime over a one year period (1989), and synthesized consumer load data based on the characteristics of typical usage of domestic appliances, along with the estimated working patterns of a local isolated community. In this work, we use a more realistic hourly consumer load, which is the result of an experiment realized in a Maroccan village using a diesel engine to provide electricity for lighting and audio-visual. The 1989 wind data were reworked for a large series of measurements (12 years). The optimum wind turbine size and the benefits of a storage system on fuel saving are also reviewed. This work is concerned with diesel fuel consumption: an optimum design of the considered system is to be found which minimises the cost energy generation over the equipments' lifetime. Given the economic assumption made (the most important being a fuel price of 4.5 Dh/litre and an interest rate of 5% net of inflation), the wind/diesel energy system has been shown to be competitive with diesel-only generation in the wind regime of the Tangier location for the cost per unit wind turbine swept area less than 3000 Dh/m 2 (8Dh=1$). (author)

  20. Photovoltaic systems: A cost competitive option to supply energy to off-grid agricultural communities in arid regions

    International Nuclear Information System (INIS)

    Qoaider, Louy; Steinbrecht, Dieter

    2010-01-01

    The main objective of this work is to investigate the economic feasibility of photovoltaic technology to supply the entire energy demands to off-grid irrigated-farming-based communities in the arid regions. This aims at helping these communities to find practical solutions to cope with the rapid rising electricity generation costs, mainly by diesel generators (gensets). The genset electricity costs are typically affected by the high fossil fuel prices, the fuel transport costs and the intensive operation and maintenance (O and M) requirements. The work was conducted on a representative site from which conclusions could be drawn for similar regions. The case study was performed in the New Kalabsha Village in the Lake Nasser Region (LNR) in southern Egypt. The work involved the technical design and the calculation of the life cycle costs (LCC) of a PV system, which is able to supply the village with its entire energy demand. The PV generator was sized in such a way to daily pump 111 000 m 3 of lake water to irrigate 1260 ha acreage plots and to electrify the adjacent village's households. The required pumps were designed to pump the fluctuating lake's water for a maximum differential head of 17 m in four different locations. Consequently, water from the four pumping stations flows freely by gravity forces to the different plots through overhead open canals. The electricity generation costs and the performance of the designed PV generator were compared with those of an equivalent diesel generator (genset) in order to prove its competitiveness. With this regard, the real market value of the diesel fuel of 86.55 c Euro l -1 was considered for calculating the costs of genset generated electricity. The results showed that the genset electricity unit costs 39 c Euro kW h -1 while a unit of PV electricity costs only 13 c Euro kW h -1 for the equivalent system size and project lifetime. Furthermore, the subsidised genset electricity cost was calculated to be 12 c Euro kW h

  1. U.S. Trade Deficit and the Impact of Rising Oil Prices

    National Research Council Canada - National Science Library

    Jackson, James K

    2008-01-01

    .... The fall in the cost of energy imports combined with the drop in import volumes as a result of the slowdown in economic activity has reversed the trend of rising energy imports costs and will sharply...

  2. State trends in premiums and deductibles, 2003-2009: how building on the Affordable Care Act will help stem the tide of rising costs and eroding benefits.

    Science.gov (United States)

    Schoen, Cathy; Stremikis, Kristof; How, Sabrina K H; Collins, Sara R

    2010-12-01

    Rapidly rising health insurance costs have strained U.S. families and employers in recent years. This issue brief examines data for all states on changes in private employer premiums and deductibles for 2003 and 2009. The analysis finds that premiums for businesses and their employees increased 41 percent across states from 2003 to 2009, while per-person deductibles jumped 77 percent in large as well as small firms. If these trends continue at the rate prior to enactment of the Affordable Care Act, the average premium for family coverage will rise 79 percent by 2020, to more than $23,000. The authors describe how health reform offers the potential to reduce insurance cost growth while improving value and protection. If reforms succeed in slowing premium growth by 1 percentage point annually in all states, by 2020 employers and families together will save $2,323 annually for family coverage, compared with projected trends.

  3. What went wrong in California's electricity market?

    International Nuclear Information System (INIS)

    Chikeung Woo

    2001-01-01

    The California electricity market reform promised to deliver reliable service at low and stable prices. Frequent capacity shortages and the ensuing rolling black-outs, price spikes, and large price volatility since Summer 2000 raise a simple but substantive question: what went wrong? The answer to this question will help countries contemplating electricity market reform not to commit similar mistakes. We find the answer by identifying the major factors that have turned the California dream into a nightmare. Such factors include poor market design, market power, sustained demand growth not matched by new capacity, rising marginal cost, and financial insolvency. Proposed remedies include an alternative market settlement process, long-term contract, fast licensing and siting process for new generation and transmission, conservation and energy-efficiency, distributed resources, rate options, and debt restructuring. The California experience suggests that a reversible regulatory reform is a safe alternative to an irreversible market reform. (Author)

  4. Did residential electricity rates fall after retail competition? A dynamic panel analysis

    International Nuclear Information System (INIS)

    Swadley, Adam; Yücel, Mine

    2011-01-01

    A key selling point for the restructuring of electricity markets was the promise of lower prices. There is not much consensus in earlier studies on the effects of electricity deregulation in the U.S., particularly for residential customers. Part of the reason for not finding a consistent link with deregulation and lower prices was that the removal of transitional price caps led to higher prices. In addition, the timing of the removal of price caps coincided with rising fuel prices, which were passed on to consumers in a competitive market. Using a dynamic panel model, we analyze the effect of participation rates, fuel costs, market size, a rate cap and switch to competition for 16 states and the District of Columbia. We find that an increase in participation rates, price controls, a larger market, and high shares of hydro in electricity generation lower retail prices, while increases in natural gas and coal prices increase rates. We also find that retail competition makes the market more efficient by lowering the markup of retail prices over wholesale costs. The effects of a competitive retail electricity market are mixed across states, but generally appear to lower prices in states with high participation rates. - Highlights: ► We analyze the effects of retail competition in electricity markets on residential retail prices. ► Analysis carried out using a dynamic panel model; monthly data for 17 U.S. states. ► More customer participation and larger market lead to lower prices. ► Higher fuel costs increase retail prices, but with a lag. ► Retail competition leads to a more efficient electricity market.

  5. Opinion Leaders See Rising College Costs as Major Concern.

    Science.gov (United States)

    Chronicle of Higher Education, 1988

    1988-01-01

    A recent survey of federal government officials, corporate leaders in charge of personnel and research, and journalists found dramatically different views in some areas, but agreement in concern about college costs, financing, and lack of government spending for research. Most felt college is a fair value for the cost. (MSE)

  6. Decarbonizing the European electricity sector. Modeling and policy analysis for electricity and CO_2 infrastructure networks

    International Nuclear Information System (INIS)

    Oei, Pao-Yu Charly Robin

    2016-01-01

    This dissertation uses three models to analyze different decarbonization strategies for combating global climate change: The cost minimizing mixed-integer model CCTS-Mod examines the economics of Carbon Capture, Transport, and Storage (CCTS) for the electricity and industry sector; the welfare maximizing quadratically constrained model ELMOD focuses on different trajectories for renewable energy sources (RES) and transmission grid expansions; and the equilibrium model ELCO combines the insights of the individual sectors to a combined CCTS and electricity investment and dispatch model. Modeling results show that an investment in CCTS is beneficial for the iron and steel sector once the CO_2 certificate price exceeds 50 Euros/t CO_2. The threshold is 75 Euros/t CO_2 for the cement industry and 100 Euros/t CO_2 for the electricity sector. Additional revenues from using CO_2 for enhanced oil recovery (CO_2-EOR) lead to an earlier adoption of CCTS in the North Sea region. The lack of economies of scale results in increasing CO_2 storage costs of more than 30%, while transport costs even double. Research from the last years, however, indicates that CCTS is unlikely to play an important role in decarbonizing the electricity sector. The identified reasons for this are incumbents' resistance to structural change, wrong technology choices, over-optimistic cost estimates, a premature focus on energy projects instead of industry, and the underestimation of transport and storage issues. Keeping global temperature rise below 2 C therefore implies the phase-out of fossilfueled power plants and, in particular, of CO_2-intensive coal power plants. The low CO_2 price established by the European Emissions Trading Scheme is insufficient to induce a fuel switch in the medium term. Therefore, supplementary national measures are necessary to reduce coal-based power generation; i.a. feed-in tariffs for RES, minimum CO_2 prices, or emissions performance standards. Analyses for Germany show

  7. Dispersion of pollutants, environmental externalities due to a pulverized coal power plant and their effect on the cost of electricity

    International Nuclear Information System (INIS)

    Czarnowska, Lucyna; Frangopoulos, Christos A.

    2012-01-01

    Energy conversion systems generate pollution that causes damages to the environment and the society. The objective of this work is to study the dispersion of pollutants and assess the environmental and social cost due to pollution from such a system. For this purpose, a pulverized coal power plant is selected. Using thermodynamic principles combined with empirical techniques, the quantities of pollutants emitted by the plant are estimated. Then, using the EcoSenseWeb software, which is based on the results of the ExternE project, the external environmental cost (externalities) of pollution is assessed. The plant is considered as located in four different cities in Poland and the externalities are calculated for each city separately. It is shown that the external environmental cost has a strong influence on the unit cost of electricity. In addition, the dispersion of pollutants is presented for the plant located in Olsztyn city. Furthermore, the plant is considered as located near the capitals of European countries and the environmental externalities are calculated for each city. The neighboring countries that are strongly affected by the plant in each particular city are identified. The sensitivity of the unit cost of electricity to certain important parameters is investigated. -- Highlights: ► The external cost of pollution has a significant impact on the cost of electricity. ► The results depend on the particular plant, location and level (local-global). ► Externalities make the installation of abatement equipment economical. ► The source location of emissions has a significant effect on the external cost. ► The transboundary pollution has a strong effect on the environmental cost.

  8. Characteristics of DC electrical braking method of the gas circulator to limit the temperature rise at the heat transfer pipes in the HTTR

    International Nuclear Information System (INIS)

    Kawasaki, K.; Saito, K.; Iyoku, T.

    2001-01-01

    In the safety evaluation of a High Temperature Engineering Test Reactor (HTTR), it must be confirmed that the core has no chance to be damaged and the barrier against the FP release is designed properly not to be affecting the influence of radiation around the reactor site. Especially the maximum temperature of the reactor pressure boundary such as the heat transfer pipes of pressurized water cooler (PWC) must not exceed the permissible values under an anticipated accident such as pipe of rupture in PWC. A requirement for the gas circulator which circulates helium gas in the primary cooling line and the secondary cooling line, is to be braked within 10 seconds by an electrical braking method after the HTTR reactor has scrammed under the accident in PWC. The reason is that the temperature rise of the heat transfer pipe at PWC has to be suppressed when the gas circulator has stopped, the revolution of the gas circulator decreases like the free coast down so that it takes about 90 seconds to be zero and the temperature rise of the pipe in the PWC exceeds the permissible value. By braking within 10 secs., the temperature of the pipe in the PWC reaches about 368 deg. C, less than the permissible value. Using a simplified equivalent circuit of an induction motor, braking time analysis was performed with obtained electrical resistance and inductance. The obtained braking time is about 10 secs., showing close agreement with analysis values. (author)

  9. Marginal cost and congestion in the Italian electricity market: An indirect estimation approach

    International Nuclear Information System (INIS)

    Bigerna, Simona; Andrea Bollino, Carlo; Polinori, Paolo

    2015-01-01

    In this paper we construct an indirect measure of the supply marginal cost function for the main generators from the observed bid data in the Italian electricity market in the period 2004–2007. We compute the residual demand function for each generator, taking explicitly into account the issue of transmission line congestion. This procedure allows recovering correct zonal Lerner index and the implied measure of the marginal cost function. We find evidence of a stable U-shaped marginal cost function for three main Italian generators, but a flat function for ENEL, the former national monopolist. The policy relevance of our approach lies in the possibility to offer some empirical knowledge of the marginal cost function of each generator to the regulator to design appropriate policy measures geared to the promotion of competitive market conditions. We propose a new market surveillance mechanism, which is based on the principle of sanctioning excessive deviations from the estimated measure of the marginal cost function presented in this work. -- Highlights: •We construct an indirect measure of the supply marginal cost function. •We compute the residual demand function taking into account transmission line congestion. •We find a general evidence of a stable U-shaped marginal cost function for Italian generators. •We find flat marginal cost function for the former national monopolist. •We use excessive deviations from estimated marginal cost function as a new market surveillance mechanism

  10. Observed rise of visible plumes from hyperbolic natural draft cooling towers

    Energy Technology Data Exchange (ETDEWEB)

    Brennan, P T [Smith-Singer Meteorologists, Inc., Amityville, NY; Seymour, D E; Butler, M J; Kramer, M L; Smith, M E; Frankenberg, T T

    1976-01-01

    The behavior of natural draft cooling tower plumes and related meteorological variables have been measured from aircraft near three major plants of the American Electric Power System. The rise of those plumes which persisted long enough to reach a stabilized height depended primarily upon the height of the capping inversion aloft. All such plumes rose to elevations of 425 m or more above grade. No significant relationships between plume rise and wind speed, plant load, or ambient temperature were found. We conclude that simple temperature humidity soundings in the vicinity of the towers would serve as effective predictors of plume rise and persistence.

  11. A smart electricity policy for Alberta : enhancing the Alberta advantage

    International Nuclear Information System (INIS)

    Pape-Salmon, A.; Hornung, R.; Macintosh, R.; Marr-Laing, T.

    2001-03-01

    The promotion of sustainable energy technologies under a competitive electricity market in Alberta was discussed. The electric power industry in Alberta is currently in a crisis with rising electricity prices. The government has tried to mitigate the impacts by providing large rebates to help ease the financial burden on consumers. The author argued that unless the fundamental causes of the problem are dealt with, Albertans will soon face even larger problems. This paper described a new approach to electricity sector planning in Alberta. In particular, the approach focused on conserving energy and improving energy efficiency as well as on increasing the use of low-impact renewable energy such as small hydro, wind, solar, geothermal, biomass and waste fuel generators and cogenerators. New policies would protect consumers from price and resource instability as well as from human health and environmental degradation. Additional policies would promote diversity in electricity supply and competition. Competition encourages electricity suppliers to work through market based mechanisms instead of government regulation or intervention. Competition in the electricity markets may also lead to increased customer choice, a larger number players in the electricity generation sector, and greater opportunities for trade. Increased competition may force producers to develop cost effective technologies that promote sustainable development to mitigate some environmental impacts. 3 tabs

  12. Are small-scale grid-connected photovoltaic systems a cost-effective policy for lowering electricity bills and reducing carbon emissions? A technical, economic, and carbon emission analysis

    International Nuclear Information System (INIS)

    McHenry, Mark P.

    2012-01-01

    This research discusses findings from technical simulations and economic models of 1 kW p and 3 kW p grid-connected photovoltaic (PV) systems supplying a rural home electricity load in parallel with the electricity network in Western Australia (WA). The technical simulations are based on electricity billing, consumption monitoring, an energy audit data, combined with 15 min interval load and PV system performance for commercially available technologies and balance of system components, using long-term meteorological input data. The economic modelling uses 2010 market prices for capital costs, operational costs, electricity tariffs, subsidies, and is based on discounted cash flow analyses which generate a final net present value (NPV) for each system against network electricity costs (in Australian dollars, AUD) over a 15 year investment horizon. The results suggest that current market prices generate a negative NPV (a net private loss), even with the current government subsidies, which lead to higher home electricity costs than conventional network electricity use. Additionally, the private costs of carbon emission mitigation (AUD tCO 2 -e −1 ) for the grid-connected PV system simulations and models were around AUD 600-700 tCO 2 -e −1 , a particularly expensive option when compared to existing large-scale renewable energy mitigation activities. - Highlights: ► Subsidised small-scale grid-connected PV systems can increase home electricity costs. ► Subsidies for private PV systems are provided by those who do not receive a benefit. ► Small-scale grid-connected PV systems result in very high costs of mitigation. ► Verifying actual mitigation from grid-connected small-scale systems is problematic. ► Maintain medium/large-scale grid-connected or small-scale off-grid system subsidies.

  13. Electricity market integration: Redistribution effect versus resource reallocation

    International Nuclear Information System (INIS)

    Finon, Dominique; Romano, Elliot

    2009-01-01

    Summary: In countries with a significant amount of low variable cost generation capacity, the integration of electricity markets poses a real problem with respect to consumers' interests. In such cases, consumers face a significant price rise compared with consumers in countries where low-cost capacities are lacking. This paper analyses this problem both in the short and long term, focusing on a market dominated by nuclear and hydro production. When there are too many restrictions on new capacity developments in low-cost technologies, market integration will lead to surplus redistribution without any production reallocation. This really makes it legitimate to contemplate redistributive compensations towards local consumers in countries which benefited from low variable cost generators at the moment of liberalisation. This paper examines two alternative ways of rent reallocation, one by income with a windfall tax on nuclear producers and the allocation of this revenue to energy efficiency policy funds, and another by price by giving drawing rights on the existing nuclear generators' production to small commercial and domestic consumers, at a level equivalent to the one necessary to maintain regulated prices.

  14. A Cost to Benefit Analysis of a Next Generation Electric Power Distribution System

    Science.gov (United States)

    Raman, Apurva

    This thesis provides a cost to benefit analysis of the proposed next generation of distribution systems- the Future Renewable Electric Energy Distribution Management (FREEDM) system. With the increasing penetration of renewable energy sources onto the grid, it becomes necessary to have an infrastructure that allows for easy integration of these resources coupled with features like enhanced reliability of the system and fast protection from faults. The Solid State Transformer (SST) and the Fault Isolation Device (FID) make for the core of the FREEDM system and have huge investment costs. Some key features of the FREEDM system include improved power flow control, compact design and unity power factor operation. Customers may observe a reduction in the electricity bill by a certain fraction for using renewable sources of generation. There is also a possibility of huge subsidies given to encourage use of renewable energy. This thesis is an attempt to quantify the benefits offered by the FREEDM system in monetary terms and to calculate the time in years required to gain a return on investments made. The elevated cost of FIDs needs to be justified by the advantages they offer. The result of different rates of interest and how they influence the payback period is also studied. The payback periods calculated are observed for viability. A comparison is made between the active power losses on a certain distribution feeder that makes use of distribution level magnetic transformers versus one that makes use of SSTs. The reduction in the annual active power losses in the case of the feeder using SSTs is translated onto annual savings in terms of cost when compared to the conventional case with magnetic transformers. Since the FREEDM system encourages operation at unity power factor, the need for installing capacitor banks for improving the power factor is eliminated and this reflects in savings in terms of cost. The FREEDM system offers enhanced reliability when compared to a

  15. How much electricity really costs. Comparison of the state subsidisation and overall social costs of conventional and renewable energy resources; Was Strom wirklich kostet. Vergleich der staatlichen Foerderungen und gesamtgesellschaftlichen Kosten konventioneller und erneuerbarer Energien

    Energy Technology Data Exchange (ETDEWEB)

    Kuechler, Swantje; Meyer, Bettina

    2012-07-01

    This study explains how the costs of electricity are an aggregate of different components. The electricity price paid by the end consumer contains not only the actual costs of energy production, which make up only about a third of the actual price in an average household, but also different surcharges such as network charges, electricity tax, value added tax and the concession levy. It furthermore contains the allocation charge stipulated by the Renewable Energy Law (EEG reallocation charge) as a means of allocating the costs of the subsidisation of electricity from renewable resources to the consumers. On the other hand conventional energy resources such as nuclear energy, hard coal and brown coal have substantially benefited over many decades from state subsidies in the form of financial aids, tax rebates and other promotive measures. The main difference between this and the subsidisation of renewable energy is that the costs of conventional energy resources are largely charged to the state budget rather than being made transparent in the electricity price. Based on an evaluation of the literature, data, interviews and the authors' own methodological deliberations this study makes a systematic comparison of the direct as well as indirect state subsidisation of renewable and conventional energy resources during the period from 1970 until 2012. The annual totals obtained for each energy resources are then set in relation to the share of that resource in overall electricity production, yielding specific subsidisation rates in terms of cents per kWh for each resource. This does not yet take into account the high consequential costs in the form of environmental damage and climate-related damage caused by fossil and nuclear fuels as well as the risks associated with the latter (collectively referred to as ''external costs''), all of which are charged to the polluters only at a small fraction of the true amount. The two cost categories of state

  16. Electricity rates in Canada, 1991

    International Nuclear Information System (INIS)

    1991-01-01

    Numerical data only are presented for monthly electricity costs (residential and commercial) for selected Canadian cities. Total electricity supply is broken down by province. Residential, urban and rural electricity costs, including taxation, are provided for selected Canadian cities. Calculations of electricity costs for commercial and residential sectors are tabulated by province. Historical data from 1974 are supplied

  17. The comparative costs of nuclear and fossil fuelled power plants in an American electricity utility

    International Nuclear Information System (INIS)

    Corey, G.R.

    1984-01-01

    This chapter compares the current and historic operating performances of twelve large nuclear and coal-fired units now operated by Commonwealth Edison Company, and provides specific comparison of bus-bar costs of electricity generated by those units in recent years. It also provides cost comparisons for future nuclear and coal-fired units and attempts to deal realistically with the effect of future inflation upon these comparisons. The chapter attempts to deal responsibly with the problem of uncertainty - how present-day comparisons may be affected by future developments and how my own published comparisons have varied over the past four or five years. The conclusion is reached that, given the uncertain world in which we live, no electric power supplier can afford to put all its eggs in one basket. Utility managers have a strong incentive to diversify their sources of power generation, and society as a whole would do well to encourage such diversification. (author)

  18. Techno-economic analysis of concentrated solar power plants in terms of levelized cost of electricity

    Science.gov (United States)

    Musi, Richard; Grange, Benjamin; Sgouridis, Sgouris; Guedez, Rafael; Armstrong, Peter; Slocum, Alexander; Calvet, Nicolas

    2017-06-01

    Levelized Cost of Electricity (LCOE) is an important metric which provides one way to compare the economic competitiveness of different electricity generation systems, calculated simply by dividing lifetime costs by lifetime production. Hidden behind the simplicity of this formula are various assumptions which may significantly alter results. Different LCOE studies exist in the literature, although their assumptions are rarely explicitly stated. This analysis gives all formulas and assumptions which allow for inter-study comparisons. The results of this analysis indicate that CSP LCOE is reducing markedly over time and that given the right location and market conditions, the SunShot 6¢/kWh 2020 target can be reached. Increased industrial cooperation is needed to advance the CSP market and continue to drive down LCOE. The results also indicate that there exist a country and technology level learning effect, either when installing an existing CSP technology in a new country or when using a new technology in an existing CSP country, which seems to impact market progress.

  19. The relationship between electricity consumption, electricity prices and GDP in Pakistan

    International Nuclear Information System (INIS)

    Jamil, Faisal; Ahmad, Eatzaz

    2010-01-01

    This study analyzes the relationship among electricity consumption, its price and real GDP at the aggregate and sectoral level in Pakistan. Using annual data for the period 1960-2008, the study finds the presence of unidirectional causality from real economic activity to electricity consumption. In particular, growth in output in commercial, manufacturing and agricultural sectors tend to increase electricity consumption, while in residential sector, growth in private expenditures is the cause of rising electricity consumption. The study concludes that electricity production and management needs to be better integrated with overall economic planning exercises. This is essential to avoid electricity shortfalls and unplanned load shedding.

  20. Decarbonizing the European electricity sector. Modeling and policy analysis for electricity and CO{sub 2} infrastructure networks

    Energy Technology Data Exchange (ETDEWEB)

    Oei, Pao-Yu Charly Robin

    2016-03-03

    This dissertation uses three models to analyze different decarbonization strategies for combating global climate change: The cost minimizing mixed-integer model CCTS-Mod examines the economics of Carbon Capture, Transport, and Storage (CCTS) for the electricity and industry sector; the welfare maximizing quadratically constrained model ELMOD focuses on different trajectories for renewable energy sources (RES) and transmission grid expansions; and the equilibrium model ELCO combines the insights of the individual sectors to a combined CCTS and electricity investment and dispatch model. Modeling results show that an investment in CCTS is beneficial for the iron and steel sector once the CO{sub 2} certificate price exceeds 50 Euros/t CO{sub 2}. The threshold is 75 Euros/t CO{sub 2} for the cement industry and 100 Euros/t CO{sub 2} for the electricity sector. Additional revenues from using CO{sub 2} for enhanced oil recovery (CO{sub 2}-EOR) lead to an earlier adoption of CCTS in the North Sea region. The lack of economies of scale results in increasing CO{sub 2} storage costs of more than 30%, while transport costs even double. Research from the last years, however, indicates that CCTS is unlikely to play an important role in decarbonizing the electricity sector. The identified reasons for this are incumbents' resistance to structural change, wrong technology choices, over-optimistic cost estimates, a premature focus on energy projects instead of industry, and the underestimation of transport and storage issues. Keeping global temperature rise below 2 C therefore implies the phase-out of fossilfueled power plants and, in particular, of CO{sub 2}-intensive coal power plants. The low CO{sub 2} price established by the European Emissions Trading Scheme is insufficient to induce a fuel switch in the medium term. Therefore, supplementary national measures are necessary to reduce coal-based power generation; i.a. feed-in tariffs for RES, minimum CO{sub 2} prices, or

  1. Design and Fabrication of a Dual-Photoelectrode Fuel Cell towards Cost-Effective Electricity Production from Biomass.

    Science.gov (United States)

    Zhang, Bingqing; Fan, Wenjun; Yao, Tingting; Liao, Shichao; Li, Ailong; Li, Deng; Liu, Mingyao; Shi, Jingying; Liao, Shijun; Li, Can

    2017-01-10

    A photo fuel cell (PFC) offers an attractive way to simultaneously convert solar and biomass energy into electricity. Photocatalytic biomass oxidation on a semiconductor photoanode combined with dark electrochemical reduction of oxygen molecules on a metal cathode (usually Pt) in separated compartments is the common configuration for a PFC. Herein, we report a membrane-free PFC based on a dual electrode, including a W-doped BiVO 4 photoanode and polyterthiophene photocathode for solar-stimulated biomass-to-electricity conversion. Air- and water-soluble biomass derivatives can be directly used as reagents. The optimal device yields an open-circuit voltage (V OC ) of 0.62 V, a short-circuit current density (J SC ) of 775 μA cm -2 , and a maximum power density (P max ) of 82 μW cm -2 with glucose as the feedstock under tandem illumination, which outperforms dual-photoelectrode PFCs previously reported. Neither costly separating membranes nor Pt-based catalysts are required in the proposed PFC architecture. Our work may inspire rational device designs for cost-effective electricity generation from renewable resources. © 2017 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  2. The impact of power market structure on CO2 cost pass-through to electricity prices under quantity competition. A theoretical approach

    International Nuclear Information System (INIS)

    Sijm, J.; Chen, Y.; Hobbs, B.F.

    2012-01-01

    We present a theoretical analysis of the impact of power market structure on the pass-through rate (PTR) of CO2 emissions trading (ET) costs on electricity prices. Market structure refers in particular to the number of firms active in the market and the intensity of oligopolistic competition as measured by the conjectural variation, as well as to the functional form of the power demand and supply curves. In addition, we analyse briefly the impact of other power market-related factors on the PTR of carbon costs to electricity prices. These include in particular the impact of ET-induced changes in the merit order of power generation technologies and the impact of pursuing other market strategies besides maximising generator profit, such as maximising market shares or sales revenues of power companies. Each of these factors can have a significant impact on the rate of passing-through carbon costs to electricity prices.

  3. Impacts on irrigated agriculture of changes in electricity costs resulting from Western Area Power Administration's power marketing alternatives

    International Nuclear Information System (INIS)

    Edwards, B.K.; Flaim, S.J.; Howitt, R.E.; Palmer, S.C.

    1995-03-01

    Irrigation is a major factor in the growth of US agricultural productivity, especially in western states, which account for more than 85% of the nation's irrigated acreage. In some of these states, almost all cropland is irrigated, and nearly 50% of the irrigation is done with electrically powered pumps. Therefore, even small increases in the cost of electricity could have a disproportionate impact on irrigated agriculture. This technical memorandum examines the impacts that could result from proposed changes in the power marketing programs of the Western Area Power Administration's Salt Lake City Area Office. The changes could increase the cost of power to all Western customers, including rural municipalities and irrigation districts that rely on inexpensive federal power to pump water. The impacts are assessed by translating changes in Western's wholesale power rate into changes in the cost of pumping water as an input for agricultural production. Farmers can adapt to higher electricity prices in many ways, such as (1) using different pumping fuels, (2) adding workers and increasing management to irrigate more efficiently, and (3) growing more drought-tolerant crops. This study projects several responses, including using less groundwater and planting fewer waterintensive crops. The study finds that when dependence on Western's power is high, the cost of power can have a major effect on energy use, agricultural practices, and the distribution of planted acreage. The biggest percentage changes in farm income would occur (1) in Nevada and Utah (however, all projected changes are less than 2% of the baseline) and (2) under the marketing alternatives that represent the lowest capacity and energy offer considered in Western's Electric Power Marketing Environmental Impact Statement. The aggregate impact on farm incomes and the value of total farm production would be much smaller than that suggested by the changes in water use and planted acreage

  4. Projected costs of generating electricity from nuclear and coal-fired power stations for commissioning in 1995

    International Nuclear Information System (INIS)

    1986-01-01

    This report updates and extends the previous NEA study, ''The Costs of Generating Electricity in Nuclear and Coal-fired Power Stations'', published by the OECD in late 1983. Despite the changed expectations concerning coal prices and the considerable movements in exchange rates since the first study was completed, the conclusions remain essentially the same. Nuclear Power is projected to be economically superior by a significant margin to coal-fired plants for base load electricity production in Europe, Japan and some regions of North America. In areas of North America in close proximity to supplies of cheap coal, this would be the more economic fuel, unless future nuclear investment costs can be reduced to match the best US and Canadian experience. In all regions considered, the economic advantage of both coal and nuclear over oil and gas-fired plants for commissioning in the mid-1990s is expected to be substantial. These conclusions are based on an analysis of cost projections for 900 MWe to 1400 MWe Light Water Reactors to be commissioned in 1995, operating at a levelised load factor of about 72 per cent over an assumed 25 years economic life and calculated with a 5 per cent (real) discount rate. This parallels the reference reactor selected for the NEA report ''The Economics of the Nuclear Fuel Cycle'', which was published by the OECD in June 1985, though it deviates somewhat from the reference conditions of the previous generation cost study. Contemporary coal-fired stations ranging in capacity from 330 MWe to 700 MWe with the same assumed economic life and load factor provide the basis for comparison. Some data are included on CANDU Pressurised Heavy Water Reactors, and a brief comment is annexed on the relevance of the comparisons for the smaller plants that may be of interest to countries with smaller electricity networks or where special circumstances apply

  5. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Sandra R.; Johnson, Melvin; McClevey, Kenneth; Calopedis, Stephen; Bolden, Deborah

    1992-05-01

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed for the North American Electric Reliability Council (NERC) regions. Additionally, statistics by company and plant are published in the EPM on capability of new plants, new generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel.

  6. Modelling the transition from cost-based to bid-based pricing in a deregulated electricity-market

    Energy Technology Data Exchange (ETDEWEB)

    Druce, Donald J. [BC Hydro, 6911 Southpoint Drive, Burnaby, British Columbia (Canada)

    2007-12-15

    Alberta is a province in western Canada with a deregulated electricity-market. Market clearing prices for most hours reflect the cost of either coal-fired or gas-fired thermal generation. Whenever there is a chronic shortage of generation or even a temporary one due to an outage, prices can be bid much higher than fuel costs would suggest. The province of British Columbia borders Alberta to the west and its electric utility, BC Hydro, has a history of trade with the utilities in Alberta. BC Hydro has predominantly hydroelectric resources and large storage reservoirs. Prior to Alberta's deregulation in 1996, BC Hydro was able to enter into mutually beneficial load-factoring contracts with the Alberta utilities. Now, as long as the transmission is available, BC Hydro can buy low priced off-peak coal-fired energy and sell into the high priced periods without having to share the benefits. BC Hydro uses a combination of econometric and Monte Carlo modelling to simulate hourly price-duration curves for Alberta that capture both cost-based and bid-based characteristics. This approach provides a good fit with the stochastic dynamic programming model that BC Hydro has developed for its mid-term hydro scheduling. (author)

  7. Proceedings of the Canadian Institute's Power On conference : the latest strategies to maximize opportunities in Ontario's electricity sector

    International Nuclear Information System (INIS)

    2004-01-01

    This conference provided a forum for reviewing strategies for Ontario's electricity sector with particular reference to electricity sector reform strategies and coal phase-out commitments. A supply adequacy outlook in terms of projected demand growth and generation mix and capacity was presented by the Independent Market Operator (IMO) along with issues concerning rising energy costs in various jurisdictions. Consumer adaptation to new pricing structures was discussed as well as generation investment needs to the year 2020. Government policies and commitments in the electricity sector were reviewed, as well as issues related to emissions and the impacts of air pollution. Renewable energy portfolios were also discussed along with issues concerning infrastructure adequacy. Imports of power and the expansion of transmission capabilities between Ontario and surrounding jurisdictions were reviewed and various opportunities from Manitoba were explored. Other topics of discussion included issues concerning pricing mechanisms; cost recovery; the development of effective buying strategies; and electricity purchasing for large energy consumers. The conference featured 23 presentations, of which 8 have been catalogued separately for inclusion in this database. tabs., figs

  8. Analysis of coastal protection under rising flood risk

    Directory of Open Access Journals (Sweden)

    Megan J. Lickley

    2014-01-01

    Full Text Available Infrastructure located along the U.S. Atlantic and Gulf coasts is exposed to rising risk of flooding from sea level rise, increasing storm surge, and subsidence. In these circumstances coastal management commonly based on 100-year flood maps assuming current climatology is no longer adequate. A dynamic programming cost–benefit analysis is applied to the adaptation decision, illustrated by application to an energy facility in Galveston Bay. Projections of several global climate models provide inputs to estimates of the change in hurricane and storm surge activity as well as the increase in sea level. The projected rise in physical flood risk is combined with estimates of flood damage and protection costs in an analysis of the multi-period nature of adaptation choice. The result is a planning method, using dynamic programming, which is appropriate for investment and abandonment decisions under rising coastal risk.

  9. A joint estimation of price-cost margins and sunk capital. Theory and evidence from the European electricity industry

    International Nuclear Information System (INIS)

    Roeger, W.; Warzynski, F.

    2004-01-01

    In this paper, we propose a new methodology to jointly estimate market power and the importance of sunk capital extending the work of Hall (1988) and Roeger (1995). Wc then apply this new technique to the European electricity industry using firm level data for the period 1994-1999, and analyze the impact of the 1996 European directive to liberalize electricity markets. We find that the average price cost margin has declined from 0.29 in 1994 to 0.22 in 1999. Moreover, the magnitude of the decline is linked to firm size: the largest firms have experienced a larger percentage fall. The variable cost parameter has increased from 0.36 in 1994 to 0.56 in 1999. The main reason of the change is the switch of the relationship between real labor productivity and the share of variable capital. Our results therefore document a more competitive electricity market and a more flexible and more efficient use of capital. (au)

  10. The effectiveness of Renewable Portfolio Standard banding and carve-outs in supporting high-cost types of renewable electricity

    International Nuclear Information System (INIS)

    Buckman, Greg

    2011-01-01

    Renewable Portfolio Standards (RPSs) are renewable electricity (RES-E) subsidy mechanisms in which governments mandate how much RES-E should be generated and markets determine the cost of the subsidy needed to generate the RES-E. Two modifications of the RPS that can help support high-cost types of RES-E are banding, where governments mandate higher multiples of RPS tradable certificates for high-cost types of RES-E, and carve-outs, where governments prescribe parts of a RPS target that can be met only by a particular type, or types, of RES-E. This paper analyses the design and generation performance of banding, as used in the UK, with some reference to Italy; and carve-outs, as used in the USA. To date, there is insufficient experience of either device to reach firm conclusions about their generation effectiveness. However, there is early, tentative evidence that banding is successful at supporting high-cost types of RES-E in the UK. Carve-outs are not being fully exploited in US states that use a RPS mechanism, and Italy is using banding in a fairly insignificant way. Though both devices have different design strengths and weaknesses, and either could be adapted to specific RPS markets, banding is probably the better device for supporting high-cost RES-E. - Highlights: → I analysed three countries that use either Renewable Portfolio Standards banding or carve-outs. → I assess whether banding or carve-outs have diversified renewable electricity generation. → There's insufficient banding/carve-out experience to reach firm diversification conclusions. → There's early evidence that the UK banding is diversifying its renewable electricity.

  11. A proposal for transmission pricing methodology in Thailand based on electricity tracing and long-run average incremental cost

    International Nuclear Information System (INIS)

    Limpasuwan, T.; Bialek, J.W.; Ongsakul, W.; Limmeechokchai, B.

    2004-01-01

    Although there is no universally accepted methodology for restructuring of electricity supply industry, the transformations often involve separation of generation and transmission. Such separation results in a need for a transmission service charge to be levied on the system users. The National Energy Policy Office (NEPO) of Thailand has commissioned PricewaterhouseCooper (PwC) to propose a transmission service charge that is to be used during the market reform for the transmission business unit of the Electricity Generating Authority of Thailand (EGAT). Although the PwCs transmission use of system charge (TUOS) based on the long-run average incremental cost (LRAIC) and average transmission loss can satisfy the financial requirements, the charge allocations are not economically efficient since they do not provide any locational signal which could reflect costs imposed on the system by locating a system user in a particular geographical location. This paper describes the TUOS methodology suggested by PwC and makes a comparison with a transmission pricing method based on combination of the electricity tracing and LRAIC. The results indicate that, with electricity tracing, the charge allocations are improved in terms of fairness, as the charge reflects the geographical location and system conditions

  12. Damage cost of the Dan River coal ash spill

    International Nuclear Information System (INIS)

    Dennis Lemly, A.

    2015-01-01

    The recent coal ash spill on the Dan River in North Carolina, USA has caused several negative effects on the environment and the public. In this analysis, I report a monetized value for these effects after the first 6 months following the spill. The combined cost of ecological damage, recreational impacts, effects on human health and consumptive use, and esthetic value losses totals $295,485,000. Because the environmental impact and associated economic costs of riverine coal ash spills can be long-term, on the order of years or even decades, this 6-month assessment should be viewed as a short-term preview. The total cumulative damage cost from the Dan River coal ash spill could go much higher. - Highlights: • Six-month post-spill damage cost exceeded $295,000,000. • Components of cost include ecological, recreational, human health, property, and aesthetic values. • Attempts by the electric utility to “clean” the river left over 95% of coal ash behind. • Long-term impacts will likely drive the total damage cost much higher. - Damage costs of the Dan River coal ash spill are extensive and growing. The 6-month cost of that spill is valued at $295,485,000, and the long-term total cost is likely to rise substantially

  13. The merit order effect of wind and photovoltaic electricity generation in Germany 2008–2016: Estimation and distributional implications

    International Nuclear Information System (INIS)

    Cludius, Johanna; Hermann, Hauke; Matthes, Felix Chr.; Graichen, Verena

    2014-01-01

    Generation from renewable energy sources in Germany has experienced a considerable uptake in recent years. Mainly responsible for this development is the German Renewable Energy Sources Act (Erneuerbare Energien Gesetz, EEG). This paper considers redistributive implications of the EEG for different electricity consumers. Using time-series regression analysis, we show that electricity generation by wind and PV has reduced spot market prices considerably by 6 €/MWh in 2010 rising to 10 €/MWh in 2012. We use these results to build a near-term forecasting tool for merit order effects, projected to reach 14-16 €/MWh in 2016. On the other hand, the costs of the EEG are passed forward to consumers in the form of a surcharge. Our findings highlight significant redistributive transfers under the current design of the EEG. In particular, some energy-intensive industries are benefiting from lower wholesale electricity prices whilst being largely exempted from contributing to the costs of the scheme. We also highlight implications of our results for other areas for reform of the EEG, such as adequate remuneration mechanisms that ensure efficient operation and investment decisions are made under the scheme. More generally, these findings suggest that policy makers need to integrate distributional assessments into policy design and implementation. - Highlights: • The German Renewable Energy Sources Act (EEG) has important distributional impacts on different electricity consumers. • Likely wealth transfers from households and small business to energy-intensive industry. • Merit order effects of around 10 €/MWh in 2012 are set to rise to 14–16 €/MWh in 2016. • These effects likely overcompensate exempt industry for contribution to cost of the EEG. • Implications for short- and long-term reform of the EEG and the design of renewable energy policy in general

  14. Cost-benefit analysis of a green electricity system in Japan considering the indirect economic impacts of tropical cyclones

    International Nuclear Information System (INIS)

    Esteban, Miguel; Zhang, Qi; Longarte-Galnares, Gorka

    2012-01-01

    Global warming is likely to profoundly influence future weather patterns, and one consequence of this is the likelihood of an increase in tropical cyclone intensity. The present paper presents a cost-benefit analysis of introducing significant amounts of green energy in the electricity system in Japan in the light of the economic damage that an increase in tropical cyclone intensity could have on GDP growth between 2010 and 2085. Essentially the passage of a tropical cyclone will result not only in physical damage but also on a decrease in economic productivity due to precautionary cessation of the economic activity, which has an effect on GDP growth. By comparing the economic performance of different electricity system scenarios with the indirect economic damage of tropical cyclones from 2010 to 2085, based on the yearly economic data of green electricity, fossil fuel, GDP and population, it can be seen that the green scenarios are generally a cost-effective way of mitigating the effects of these weather systems, despite the large amount of initial investments necessary. - Highlights: ► Climate change is likely to increase the future strength of tropical cyclones. ► An increase in tropical cyclone strength would reduce GDP growth in Japan. ► Reducing green-house gas emissions is a cost-effective mitigation strategy.

  15. (Value Stream Costing As A New Costing System)

    OpenAIRE

    Karcıoğlu, Reşar; Nuray, Meral

    2010-01-01

    In recent years, the number of lean company which use lean manufacturing system is rising. This companies use the standard costing while appropriate for traditional bathch manufacturing. But standard costing system fails to support the goals of lean manufacturing system. A different method of costing based upon the characteristics of the value stream is needed to fulfill the needs of the lean company. This systemis Value Stream Costing. When a lean company moves to value stream management, th...

  16. A review of the IEA/NEA Projected Costs of Electricity – 2015 edition

    International Nuclear Information System (INIS)

    Khatib, Hisham

    2016-01-01

    The IEA/NEA recently issued their eighth edition of the Study on the “Projected Costs of Generating Electricity” – 2015 edition. The Study is mainly concerned with calculating the levelised cost of electricity (LCOE). The LCOE calculations are based on a levelised average life time cost approach using the discounted cash flow (DCF) method. The analysis was this year, and for the first time, performed using three discount rates (3%, 7%, and 10%). The LCOE can serve as a tool for calculating the cost of different generation technologies. However the Study's usefulness is affected by its narrow base of a limited set of countries that are not necessarily representative. It ignored the negative role of subsidies and did not provide a methodology for selective application of the discount rates and costing of carbon. The global power generation scene is changing. Generation growth in OECD countries has become very limited; simultaneously there is rapid growth of varying renewables (VRE) generation which needs special criteria for assessing its system cost. All this demands a rethinking of the application and usefulness of the LCOE in future generation planning. - Highlights: • LCOE is a useful tool for economics of generation technologies. • The IEA/NEA study did not cover fully the required criteria for assessment. • It ignored interpretation of: the discount rate, carbon costing and subsidies. • The world energy scene is changing, this requires reassessment of LCOE.

  17. Costly energy : why oil and gas prices are rising and what we can do about it : a collection of progressive analysis and policy alternatives

    International Nuclear Information System (INIS)

    Klein, S.

    2001-02-01

    A collection of essays were presented to address the issue of rising oil and gas prices. This issue has significant social and environmental implications and the public wants to know what is driving prices up and who is profiting. The myth that gas taxes are driving price increases was dispelled. It was argued that price hikes are mainly due to crude oil price increases and to refining and marketing price increases. The link between rising prices and free trade was also emphasized. The North American Free Trade Agreement (NAFTA) tied Canada into a North American energy market in which U.S. demand sets prices in Canada. It was suggested that trade rules regarding energy should be changed. Other short and longer-term progressive policy alternatives were also presented in the second part of this report. One possible short-term policy response would be to tax windfall oil and gas profits and direct the resulting revenues to rebates for low-income households and for energy conservation initiatives. It was noted that the environmental benefit of rising prices is that it encourages conservation and improved fuel efficiency. The final part of this report discussed the issue of protecting electricity from deregulation and sited lessons learned from the deregulation of natural gas. 2 tabs., 4 figs

  18. The costs of electricity systems with a high share of fluctutating renewables. A stochastic investment and dispatch optimization model for Europe

    International Nuclear Information System (INIS)

    Nagl, Stephan; Fuersch, Michaela; Lindenberger, Dietmar

    2012-01-01

    Renewable energies are meant to produce a large share of the future electricity demand. However, the availability of wind and solar power depends on local weather conditions and therefore weather characteristics must be considered when optimizing the future electricity mix. In this article we analyze the impact of the stochastic availability of wind and solar energy on the cost-minimal power plant mix and the related total system costs. To determine optimal conventional, renewable and storage capacities for different shares of renewables, we apply a stochastic investment and dispatch optimization model to the European electricity market. The model considers stochastic feed-in structures and full load hours of wind and solar technologies and different correlations between regions and technologies. Key findings include the overestimation of fluctuating renewables and underestimation of total system costs compared to deterministic investment and dispatch models. Furthermore, solar technologies are - relative to wind turbines - underestimated when neglecting negative correlations between wind speeds and solar radiation.

  19. Cost considerations

    NARCIS (Netherlands)

    Michiel Ras; Debbie Verbeek-Oudijk; Evelien Eggink

    2013-01-01

    Original title: Lasten onder de loep The Dutch government spends almost 7 billion euros  each year on care for people with intellectual disabilities, and these costs are rising steadily. This report analyses what underlies the increase in costs that occurred between 2007 and 2011. Was

  20. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Energy Information Administration (EIA) prepares the Electric Power Monthly (EPM) for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source, consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.